                      ANNUAL REPORTS, WAR DEPARTMENT
                                FISCAL YEAR ENDED JUNE 30, 1937




                                  REPORT OF THE

           CHIEF OF ENGINEERS
                                             U. S. ARMY


                                                 1937

                                            IN TWO PARTS

                                                PART 1




                                                UNITED STATES
                                     GOVERNMENT PRINTING OFFICE
                                             WASHINGTON : 1937



For sale by the Superintendent of Documents, Washington, D.C. . * *   * * * * * * * * * Price $3.50 (cloth)
     ANNUAL REPORT
          OF THE



CHIEF OF ENGINEERS
   UNITED STATES ARMY



          1937


                        1.
                              REPORT
                                   OF


        THE CHIEF OF ENGINEERS
                       UNITED STATES ARMY


                                        WAR DEPARTMENT,
                            OFFICE OF THE CHIEF OF ENGINEERS,
                                   Washington, October 4, 1937.
Subject: Annual Report.
To: The Secretary of War.
  I present for your information the following report upon river
and harbor improvement work, including flood-control operations,
under the charge of the Corps of Engineers, for the fiscal year end-
ing June 30, 1937.
                          RIVERS AND HARBORS

   The improvement of rivers and harbors of the continental United
States, Puerto Rico, Alaska, and the Hawaiian Islands, in the in-
terests of navigation for the fiscal year 1937, was prosecuted in ac-
cordance with the projects authorized by Congress. Work was also
under way on a number of flood-control projects authorized by the
Federal Emergency Administration of Public Works and the Works
Progress Administration. Approximately 1,000 river and harbor
projects were in force at the close of the fiscal year, and active opera-
tions were underway on 342 of these projects.
   The River and Harbor Act approved August 26, 1937, adopted
141 new projects, or modifications of existing projects, having a total
estimated cost in excess of $50,000,000.
   The general flood-control legislation approved on June 22, 1936,
adopted some 270 flood-control projects and authorized an expedi-
ture of not to exceed $320,000,000 for the execution of these projects
and the cost of the 232 preliminary examinations and surveys for
flood control included in that legislation. Congress by act of August
28, 1937, amended the act of June 22, 1936, to include provision for
construction of levees, flood walls, and drainage structures for the
protection of cities and towns in the Ohio River Basin, the projects to
be selected by the Chief of Engineers with the approval of the Sec-
retary of War, at a cost of not to exceed $24,877,000. This act also
authorized examinations and surveys for flood control at 114 locali-
ties. The Flood Control Act of June 15, 1936, modified the project
                                                                 a
4            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

for the lower Mississippi River and increased the authorized ap-
propriation for this work in the amount of $272,000,000.
    The amount expended in the maintenance and improvement of
river and harbor works for the year was $178,829,396.50, including
the operating and care of locks and dams and removal of wrecks
•and purposes previously covered by permanent definite and indefinite
:appropriations; on flood control, $55,084,946.89; and for other mis-
cellaneous related work, $61,396.38; a total of $233,975,739.77. Con-
gress by act of June 26, 1934, repealed the permanent and indefinite
appropriation acts, and the works formerly thereunder are now being
carried out .with funds provided by regular War Department Ap-
propriation Acts.
    Funds in the amount of $17,635,781.87, received from the Emer-
gency appropriations during the fiscal year, together with funds
provided by regular appropriation, in the amount of $234,614,262.42,
have made a total sum available for the improvement of rivers and
harbors and flood control of $252,250,044.29.
    'Thesefunds have permitted substantial progress on many impor-
tant navigation and flood-control improvements, the average number
of persons directly employed during the year having been 68,000.
    The total allotments received to October 15, 1937, from the several
emergency appropriations have amounted to $512,410,395.67.
    The canalization of the upper Mississippi River to provide a 9-foot
,channel for barge navigation is 67 percent completed. Of the 26
locks and dams required, 24 locks and 15 dams have been constructed,
it being anticipated that the project will be fully completed in 1939.
The Fort Peck Dam on the Missouri River in Montana is 71 per-
cent   completed, closure of the dam having been effected June 24,
1937. Construction of the Bonneville Dam on the Columbia River
-t Bonneville, Oreg., for navigation and power has advanced to
84 percent of completion, and studies have been in progress to deter-
mine the method of distribution and marketing for the power to be
developed.
    Major improvements have been in progress at important harbors on
the Atlantic, Pacific, and Gulf coasts, and on the harbors and con-
necting channels of the Great Lakes. Enlargement of the Cape Cod
Canal to secure a depth of 32 feet, and widths of 500 feet and greater,
has been actively prosecuted, the project being 50 percent completed.
Widening and deepening to 27 feet of the Chesapeake and Delaware
Canal to provide facilities for ocean-going vessels has been vigorously
prosecuted and is well advanced to completion.
     Work on the Lake Okeechobee and Caloosahatchee flood-control
and navigation project in Florida has been in progress and is 92
percent completed. Construction of Conchas Dam and Reservoir on
South Canadian River in New Mexico, and Sardis Reservoir on Little
Tallahatchie and Yazoo Rivers in Mississippi has been inaugurated.
Construction    of the Tygart River Dam in West Virginia has been
in progress and is 95 percent completed.
    \Work has been in progress and is well advanced on construction
'of new locks and dams on the Illinois waterway at La Grange and
Peoria, Ill. These works will insure a stabilized channel 9 feet in
depth when the limited diversion of water from Lake Michigan,
                       RIVERS AND HARBORS                            5

established by Supreme Court decree, becomes effective December: 31
1938. New locks and dams have been placed in commission during
the year and are nearing full completion on Kanawha River at, Win-
field, W. Va., at Gallipolis, Ohio, and at Montgomery Island, Pa.,
on the Ohio River, replacing'12 old locks and dams built many years
ago. A new lock and dam has been completed during the year on
Savannah River at New Savannah bluff, 13 miles below Augusta, Ga.;
dam no. 17 at Lake Bankhead on Black Warrior River has <been
raised 12 feet to extend navigation to the large coal regions in north-
ern Alabama; and construction has commenced on a new lock and
dam on the Black Warrior at Tuscaloosa, Ala., to replace three old
structures.
   Substantial progress has been made on enlargement of the New
York State Barge Canal to secure a depth of 14 feet from the Hud-
son River, 187 miles to Oswego on Lake Ontario, this work being
22 percent completed.
   The approximate quantities in major classifications for work ac-
complished during the fiscal year were as follows: Dredging, 501,-
4)75,836 cubic yards; levee construction, 49,043,711 cubic yards; rock
removal, 1,840,634 cubic yards; concrete placed, 2,517,058 cubic yards;
-dikes and bulkheads, 424,762 linear feet; revetments, 245,072 linear
feet; stone placed in jetties and breakwaters, 2,714,387 tons.
   The policy of undertaking work by contract when reasonable bids
were received was continued during the fiscal year; 57.8 percent of
work was done by contract and 42.2 percent with Government plant
and hired labor.
   The water-borne commerce for the calendar year 1936 aggregated
.525,842,000 tons, with a reported value of $17,448,000,000, an increase
of 72,500,000 tons and $560,000,000 in value over the previous year,
indicating a continued material recovery from the depression years..-
   The Corps of Engineers has continued to undertake investigations
for the emergency agencies and has loaned its officers to assist these
agencies in their administrative duties. The Beach Erosion Board
has continued its investigations, in cooperation with the appropriate
agencies of various States to develop efficient protective works for
the prevention of erosion of the shores of coastal and lake waters.
Congress in Public, No. 834, approved June 26, 1936, increased the
scope of investigations to permit the Board to report on the nature
of any Federal interests which may be included in the area under
investigation. Reports on cooperative investigations have been com-
pleted for 15 localities, including 4 for the present year.
   The safety organization established in the Department at Large
was continued, and has resulted in reducing accidents and lost time
from accidents in the operations of the Department.

               FLOOD CONTROL OF THE MISSISSIPPI RIVER

  In the past year highly satisfactory progress has been made on
the flood-control project for the alluvial valley of the Mississippi
River, adopted by the act of May 15, 1928, and amended by the act
of June 15, 1936. Work authorized by the 1928 act was over 90 per-
cent completed when the amendment of 1936 was approved. The
6       REPORT OF CHIEF OF ENGINEERS. U. S. ARMY, 1937

amendment retains the purposes and the completed features of the
1928 act, and authorizes an additional $272,000,000 for extension of
flood-control work on the lower Mississippi River.
   The preparation of detailed plans for carrying out the amended
project was placed under way immediately after approval of the
1936 act, and these plans were practically completed during the past
year. Actual construction work has been started wherever possible.
It is expected that, with the receipt of the necessary assurances from
accredited local officials that they will provide the cooperation re-
quired by law, construction will be pushed forward at a rapid pace
during the fiscal year 1938 whenever and wherever rights-of-way are
actually furnished.
   Under section 6 of the 1928 act flood-control work was undertaken
on the Mississippi River between Rock Island, Ill., and Cape Girar-
deau, Mo., and on outlets and tributaries affected by backwaters of
the Mississippi River where the local contributions of one-third of
the costs were provided for such work, as required by law. The De-
partment was also able to assist localities in the repair of flood-con-
trol works on tributaries of the Mississippi River, threatened or de-
stroyed by flood, under the provision of section 7 of the 1928 act.
The allotments for this purpose during the fiscal year aggregated
$524,472.11.
   Work already accomplished in the alluvial valley of the Mississippi
River under the 1928 act made it possible for the lower river to
carry last January, February, and March the greatest Ohio River
flood of all time without mishap. The Birds Point-New Madrid
floodway, operated for the first time, satisfactorily fulfilled the pur -
pose for which it was designed, making possible the protection of
the population and concentrated wealth of Cairo, 111. With a peak
flow of over 2,000,000 second-feet in the main river just below this
emergency floodway, the high water continued to break all previous
high records as far as Sunflower Landing, Miss., over 350 miles below
Cairo. This record high water was carried between the improved
levees without any break. Thirty-three miles above New Orleans
the Bonnet Carre spillway, another completed feature of the 1928
plan, was for the first time placed in operation on January 30 and
closed gradually after March 7. Complete closure was effected March
16. During the period of operation, though never fully opened, the
spillway caused a reduction of stages at and near New Orleans of
about 3 feet by reason of the diversion of 210,000 second feet to Lake
Pontchartrain. In addition to actual damage prevented, the feeling
of safety engendered by the use of the Bonnet Carre spillway was
worth a great deal to the city of New Orleans and its environs. As
a whole the operation of the plan in 1937 was highly satisfactory and
its benefit to the vast alluvial valley cannot be overestimated.
                       NATIONAL FLOOD CONTROL


   The general Flood Control Act of June 22, 1936, established, for
the first time in the history of the Federal Government, a definite
flood-control policy which provides for its participation in the con-
struction of economically justified flood-control projects throughout
the United States in cooperation with the States, political subdivi-
sions thereof, or other local interests. Under the conditions of co-
                                                   RIVERS AND HARBORS                                                                                              7
operation Federal funds appropriated for the execution of the projects
may not be applied to the costs of lands, easements, and rights-of-way
necessary for the construction of the project, except when such costs
exceed over 50 percent of the tptal cost, and then only to meet one-
half of the excess cost thereof. IThe projects may not be placed under
way by the Federal Government until responsible interests have
agreed to hold and save the United States free from damages arising
during construction, and to maintain and operate the completed
works. The act of August 28, 1937, Public, No. 406, modifies the
conditions of cooperation for certain projects in the Ohio River Basin.
   About 270 flood-control projects, having a total estimated construc-
tion cost of $320,000,000, were authorized in this general flood-control
legislation. These projects are in addition to the work in the alluvial
valley of the Mississippi River, which has been under way for many
years. The initial funds for carrying out the provisions of the gen-
eral flood control act were appropriated July 19, 1937 although money
was previously made available from the Emergency Relief Appropri-
ation Act of 1936 which, with funds otherwise available, permitted the
Department to proceed with the preparation of detailed plans and
definite project estimates. Actual construction, within limit of avail-
able funds, can now be placed under way for many of the projects
when local interests have fulfilled the requirements of cooperation
established under the law.
   Public, No. 406, approved on August 28, 1937, amended the act of
June 22, 1936, and authorized the construction of a number of addi-
tional projects in the Ohio River Basin, the need for which was
forcefully demonstrated by the disastrous flood, of January 1937.
This act further directed the preliminary examination and survey
of a large number of rivers and streams throughout the country for
the purpose of determining the need, location, and type of additional
flood-protection work.
PROJECTS UNDER THE PUBLIC WORKS AND EMERGENCY RELIEF PROGRAMS

  On October 15, 1937, allocation of funds to the following works,
and in the net amounts indicated, had been made available to the
Corps of Engineers:

                                                                                                    Allotted


            Rivers and harbors                           National                 Public                         Emergency Relief Acts
                                                        Industrial            Works Ad-
                                                        Recovery                ministra-
                                                            Act                 tion Act            1935 Act                     1936 Act               1937 Act


Criehaven Harbor, Maine--------.......-....-----------------------...........                         $40,000.00--
M ystic R iver, M ass....---    ---
                             ..---- ----   ---------- -------------                                    475,000.00 .. . . . . . . . . . . . .
Boston Harbor, Mass .-------------- $800,000.00 $230, 806. 26                                          935,000.00 .
Cape Cod Canal, Mass --       -          4, 980, 157. 30 1, 158, 000. 00                            4, 768, 050. 00 _.........................
New Bedford and Fairhaven Har-
   bor, M ass..------------- -------                           --------       -----------              226, 537. 63_.........
New Haven Harbor, Conn . ._-----                           290,877.00                 59, 206. 75 ----------------       ------... . . ..    . .
S ou t h p or t H a r b or , C on n - . . . . - .- - - - - - - - - ------   - - - -        - ---        3 7 , 4 20 . 12 . . . . . . . . . . . . . .
E ast Chester C reek, N . Y- ------ -------------------                               ...-------       183.000. 00             . .          ..   .   . . .   . . . .
Bay Ridge and Red Hook Chan-
nels, N. Y------------------------                         64, 559. 68 ............--              .....................................
                         --
East River, N. Y_--- __-----1,                             743, 265. 42.........                     _
                                                                                           .....................................
Buttermilk Channel, N. Y....                               122, 051. 24 ..............................................
Hudson River Channel, N. Y - - -                           542, 170. 36      126, 650. 00 ....                      .............................
East Rockaway (Debs Inlet), N. Y                            82, 600.00 ........ .............                            ....................
Hudson River, N. Y----..._----.                            236,000.00            2, 350.00           310, 090.00----.............
8                 REPORT OF CHIEF OF ENGINEERS, V. S. ARMY, 1937


                                                                                                  Allotted


            Rivers and harbors                            National               Public                     Emergency Relief Acts
                                                          Industrial          Works Ad-
                                                          Recovery             ministra-
                                                            Act                tion Act            1935 Act             1936 Act            1937 Act


Great Lakes to Hudson River,
waterway==-------- ------------------                                        =----------       $4,834,991.24-------- ---------
Great Kills, Staten Island, N. Y-_-------------$36, 000.                                                             __
New YoFk and New Jersey Chan- r
   nels. -:----------- -------------             $390,000.00     417,000.00       2,000,000.00 ..    _........        .--............
Raritan River to Arthur Kill, N. J.,
   cut-off channel]-- -----              --  --   584;,000. 00   226, 500. 00------------------                  ------      ,-     -
Delaware River, Philadelphia to
   Trenton_     --_-.-.-.-_-               --.. 1,439,965. 51    750,000.00       2, 619, 844. 07------                _______-
                                                                                                                       -__
Delaware River, Philadelphia, to
 'the sea_      .------- ----------           =-813, 045.79                          2, 50.         .-
Wilmington Harbor                    .                                -              2Del 500:00,
                                                                                     205,              .-                 ---------
Chiesapeako and Delaware Canal,
- Deland Md                                                                       4, 748, 871. 00                                 -
Ocnc,Cty            or and Sinepuxent-
                  bar
     ay,Md __:.              -------              283,007. 93_
                                                 .....                                67,185.09.......         .............
  inapps Narrowsd H ,C            -     . .. _     46,1211 l20 _---_          _----:-
                                                                                  L          ----.
Hopga i River and Tar B                Ny,
                                      Md.               _-_-_-_-_-_ __.             ..27, 667.94.
Uppr1ThorOilgbfaM'o, DealsIsland,i                       ;                           .      .
                                            --        -   1---17,1342.70 -        --                 ----                - ---            -------
tat i                     Va =.---------.--
                      .er.Channiel,                           42,00.      ........---....             "......................--             -.......-
JatesRI.iv'i-      V-.        .583,                                   53--. _-                        4 ,_9. 0--=- ---------                      '--
NorfolkHaror,                         --         --                --------                           49,7850--                  ----                --
Norfolk,.:Va. :bi to Beaufort' I.nlet,!                                                    1,
  N. C .,.Inland Waterway
                      =              (Fair
  field Briide)-      ------
                          .      ,     --          80, 282.36 --                                      ----.------
Morehead City Harbor, N. C -- --                  553, 475. 86 .        -     -                        - --
Pamlico Sound to Beaufort, N. C.-..
  clannel---------4-;-'--                 --        000.00 -L---------             -        ----------- --------------
CaeiFear River, N. C., to Winyah                                            .
   oBt,-S. ., ater20ay_-,                         34,74 20        730; 693.74-.        ..                 -         :- - --
Cape.Fear River above Wilming-_-
   OeneN C'hoe dn       .       ,- -F_-- .. 1, 104, 390. '72----------------------------                                                           ----
Wiknah Bay to Charleston, S.C.,                       '
        rwterway.        _----------              207, 165.09
                                                ,054,
                                        -_-__- 1,                --                           915. 7807-
  harlestoi Iarbor, . C                  ---.           00.00 -------------
                                                               .                         -----------------------------
Clarleston Harbor, Shipyard River,- . 2, 2             1. 0-
  S. C_ar,- R-__              .                   707.2             451,563.71                                                                            ...
F rleston toleanfort,                      SC1,1,5.
Savannah River below Augusta,
    Gay.                  -...-------------
                           wy
                         r------                            1, 634, 562. 24                            340..,000---------.
                                                                                                                         0-.-
Brunswick Harbor, Ga..-----------                              102,516. 03
StlaJohns River, Fla., Jacksonville                                   ,
   to the ocean---River--                     -- -             290, 013.'37..........................................
Caloosahatchee River and Lake
    Okeechobee drainage area, Fla                           4,200,000. 00 3, 494, 385. 54 2, 171, 000. 00--------                              ----------
Jacksonville to Miami, Fla., water-
   Sway-,        --------                                    2 00  , 8------------
                                                                        .         19,     841.72           ...........................                           .....
Lake Worth Inlet, Fla______________                              30,000.00           80,000.00____________                      _-..........................._--.....
Fort Pierce Inlet, Fla...                                      250, 000. 00 ------
                                                  ..--------------                                      -- _._------_______
Miami Harbor, Fla--------------         cha__nne_________   2, 202,126.04ter__
Tampa..Harbor, Fla               _-- .______  ....-            780, 795. 42        548, 537. 82 1, 463,000. 00                           __        __
River Styx, Fla_______________                          _        14,335. 12_____                 _________
Florida Cross-State Canal___________                                             _________          5, 110,832. 83_____________ _________
St. Andrews Bay, Fla_._                              .         581, 958. 86 ..---------------------------------------
Apalachicola River to St. Andrews
    Bay, Fa., 4aterway---_                  ------            --        --- I----            ---       340, 000.00-------                     -------------
Pensacola Harbor, Fla______________                            119, 672. 91           __..         .....                    .-________.__ ___________
Chickasaw Creek. Ala___.___________                           _______           ____- ____               41,241.64.________....                            .
Alabama River, Ala                            ..---------------139, 989. 87------------ ----------                                -------      -----------
Black Warrior, Warrior, and Tom
   bigbee Rivers, Ala______________..                            79, 219. 93 1,___. ___.               609, 910. 00               _______          -        ---
Mobile Harbor, Ala_                 -                            14, 000.00--              ----------------             ----------------..........        -----........
Gulfport Harbor and Ship Island
  -Pass, MissWe-                                                 47,883.19.-----.--------------.-------------.---------
Louisiana-Texas Intracoastal Water-
  Sway.-------.--                          .--------------     820;017.77.----------..                              .------------.---------          -----------
Lake Charles deep water channel,
 - La---------------------------                                 79,577.63....----------.--------------.-----------------------
M erm entau River, MerentuLa.LaRver__________
                                      .. -            -
                                                                 29, 974.42 ....    ___
                                                                 2997442-------------                 -------------- ------------ - __...
                                                                                       .... ......................................
Petit Anse, Carlin, and Tigre
   Bayous, La___-------------------                              47, 858.13...----------------------                                   -       -------------
Sabine-Neches Waterway, Tex__ __1,                             363, 652.47-        ------                 --------------------......           -      -       _
                                                                                                                                                             ----
Galveston Harbor and Channel,
  Tex..     . ...------------------------ 13,121.45 ..........................................
Texas City Channel ,Tex-----------.136, 295. 78------------------------------------------
Houston Ship Channel, Tex-.......1,570,085.81 1,042,846.17
Freeport Harbor, Tex-....--------- 116, 574. 74-......
                                                   RIVERS AND HARBORS


                                                                                                 Allotted


            Rivers and harbors                           National              Public                      Emergency Relief Acts
                                                        Industrial          Works Ad-
                                                        Recovery             ministra-
                                                          Act                tion Act             1935 Act              1936 Act                 1937 Act


Port Aransas,Tel ..........------- $324. 287.14 ..........----...----------------
Brazos Island Harbor, Tex....- ... 2, 848, 560. 03------------ ------------
Wolf River, Tenn...--.---------.--                        586, 500. 00------
                                                                         ........--..--------------
Mississippi River:
     Ohio River to Missouri River.                  2, 987, 005. 06 $1, 007, 768.93 $1, 000, 000. 00
     Missouri River to Minneapolis_ 34, 625, 994. 94 16, 744, 597. 861 22, 858, 700. 56
Missouri River:
     Kansas City to mouth...__--..                  4,824, 780. 11 1, 643, 710. 27 1, 609, 000. 00
     Kansas City to Sioux City..... 14, 153, 108. 00 15, 000, 000.00 9, 675, 000. 00
     At Fort Peck, Mont__-_--__-__                24, 729, 000.0024, 802, 000.00 18,500, 000. 00
Rock River Pool, Ill11_________ ____                                                                   25, 000. 00
Illinois River, Ill____          ____                     910, 000.00         157, 084. 65 1, 918, 805. 00
Cumberland River, Tenn__ .....                            685, 000.  00
Allegheny River, Pa______
                        .. __...                     1, 026, 900. 00          223,'149. 38 2, 454, 242. 29
Tygart Reservoir, W. Va ...---               _-_ 3, 000, 000. 00 7, 000, 000. 00 2, 000, 000. 00
Ohio River:
     Lock and dam construction . ._ 3, 169, 167. 59                              89,200.00        1,200, 000. 00
     Open-channel work ..........                    1, 026, 301. 16             13, 934. 83                                       -------------
Kanawha River, W. Va-___ -_..... 6,408, 324.87 2, 596, 475. 36 4, 516; 00: 00
Green and Barren Rivers, Ky .. ___                          85,000. 00 .............                                               ----------J---
Agate Bay Harbor, Minn __-_--..                            48, 404.45                          .. . . .. . ...- - - I
Duluth-Superior Harbor, Minn.
                                                                                               --------------
                                                                                                                                       ---------                             ~-----
   and Wis .------          ----         - -         1, 089, 273. 83
Ashland Harbor, Wis ______________                       221, 894. 69
Keweenaw Waterway, Mich --...                                           .............
                                                                                                      182,825.77
Marquette Harbor, Mich__..            -____                 72, 188. 05
Port Washington Harbor, Wis .....                         602, 994. 45
Kewaunee Harbor, Wis _____--..                                                                        420, 000. 00
Green Bay Harbor, Wis              -- ___-                625, 000. 00        315, 800. 00
Kenosha Harbor, Wis______________ ..............                                                        27, 658. 00
Calumet Harbor and River, Ill. and
   Indl .. _         ::................ -___         2, 998,112. 00              38, 491. 05 ----------- :-
Indiana Harbor, Ind_                                                          736, 576. 78
                                                          881,467. 71 .............
Calumet-Sag Channel, Ill ...-..... 1, 529, 000. 00 ......                     813,419.      18
                                                                                      --- -- .
                                                                                                                                   -    -   -    -   -         --   -        -    -   --




Mackinac-Round Island Channel,
   Mich,.                                                 419, 399. 87 ---    i :bbb----
St. Marys River, Mich                 -                   158, 400. 98                                                                 _------r------
St. Clair River, Mich......-....                     1, 082, 831. 76          588, 827. 79              49, 395.12
Lake St. Clair, Mich., channels in__ 1, 008, 595. 07
Detroit River, Mich___... _________                  1, 381, 388. 50
                                                 ..............
                                                                              153,     000. 00                                     --
Rouge River, Mich                      -_,                                                             29, 515. 50                          -'




                                                                                                                                   -------------
                                                                                                                                                         ---            --       ii-




Toledo Harbor, Ohio_                                 3, 690, 000. 00
Lorain Harbor, Ohio__                      .              165, 000. 00
Lorain Harbor (Black River), Ohio.                          76, 300. 00
Sandusky Harbor, Ohio             -                       407, 500. 00        192, 000. 00                                         -------------
Cleveland Harbor, Ohio ____                               591, 767. 03        150, 00. 00
Ashtabula Harbor, Ohio ....--.....                        461, 648. 38           75, 000. 00
Conneaut Harbor, Ohio ..-                ___         1, 010, 500. 00
Fairport Harbor, Ohio- .... ----
Huron Harbor, Ohio_..________
                          -              .
                                                          187, 772. 04
                                                          561, 251. 52
                                                                                                                                   ------------                                            ~
Buffalo Harbor, N. Y______________                        655, 560. 00                                                                       )
                                                                                                                                   -------------
Niagara River, N. Y________                                 94, 512. 24
Black Rock Channel and Tona-                                                                      1, 760, 000. 00
   wanda Harbor, N. Y_______                     .............
Rochester Harbor, N. Y_ ___-__    .-                                                                    56, 806. 00
Ogdensburg Harbor, N. Y ______                            174, 548. 79
San Diego Harbor, Calif --- _____                           86, 352. 01                           1,226, 792. 92
Los Angeles and Long Beach Har-
   bors, Calif ._____________--_                     1, 593, 667. 46                                  996, 803. 85
Newport Bay, Calif_..._              ...                  796, 896. 83
Santa Barbara Harbor, Calif ......                          19,198. 39           10, 000. 00
San Francisco Harbor, Calif_-               _             193, 000. 00
Richmond Harbor, Calif ____--...                          105, 000. 00
Monterey Harbor, Calif...........                         207, 800.00 .. . . . . .
San Joaquin River, Calif .......... 1,158,347.99
Columbia and Lower Willamette
   Rivers __-                                             446, 296.19                                  98, 667. 57
Columbia River near Vancouver,
   W ash ......... .......--- -               -----                                                138,449.04
Columbia River at Bakers Bay,
          -
   Wash ___-                     -      ---                  78, 577. 47 _
Multnomah Channel, Oreg .......                              18.112.28
Columbia River at Bonneville,
  Oreg. -.....
            ,..................  20, 240, 700. 00112, 200, 000. 00--
                                                                  .......------.....
Columbia River, Celilo Falls to
  W allula---...    ...                                                  400, 000. 00
Willapa River and Harbor, Wash__      78,533.00 --                       192, 314. 06
Grays Harbor and Chehalis River,
  W ash_..   __-
         _- --     _-. . ..-.--
                           --         57, 000. 00.----------             409, 659. 55
10                        REPORT OF CHIEF OF ENGINEERS,                                         TJ. S. ARMY, 1937

                                                                                               Allotted

                 Rivers and harbors                  National               Public                        Emergency Relief Acts
                                                    Industrial           Works Ad-
                                                     Recovery              hinistra-
                                                       Act                 tion Act             1935 Act                 1936 Act                1937 Act

Tacoma Harbor, Wash..........                          $51,609.12 -
Lake Washington Ship Canal,
  Wash....             _..........
               ...........                             192,516.44 -. . . . . . . . . . . . . . . . . . . .    . . . . . .
Olympia Harbor, Wash..---------                        105,467.00    .       ---  . .      .     . .       . ..      .
Wrangell Narrows, Alaska........------                 136, 736. 74-_ .............................. I.............
Honolulu Harbor, Hawaii .........                      784,800.00
                                                       780, 800.00 ............  .................. ....... .............
Port Allen Harbor, Hawaii ........                     680,000.    00--------          ----------------             -----------..-------------

Kaunakakai Harbor, Hawaii.......                       103, 200. 00 ............................ ............. .............
Mayaguez Harbor, P. R- .-------                        147,186.69
                                                       147, 186. 69 - - - - - - - - - -..........
                                                                    ...............               - - - - - -.............
                                                                                         - - - - ..........        ------
San Juan Harbor, P. R--- ---------                     451, 805. 52------------- $75,869.64.....               .-- ----
Office, Chief of Engineers, and ad-
ministrative expenses...           -                    11, 630. 25 -------------              $735, 869. 64-
           Total, river and harbor-.... 183, 508, 792. 71 $93,653,854,08 103, 807, 657. 29.

                                                         FLOOD CONTROL

Connecticut River at Hadley,
  Mass., riprap -            t---H-............                                                                 $12, 818. 00...-----
Connecticut River at Hadley,
  Mass., levees ............                                                                                      29, 000.00-.........---------..
Coiif tioutt River at Hatfield,
  Mass., levees.......                                                                                            21, 146.00----------
Connecticut River at Hatfield,
  M ass., levees- ..--     ----....
                                  .... ...                                                                        21, 000. 00------------
Connecticut River at West Spring-
field, M ass ....---.--.......                                                                                   18, 500. 00......
Connecticut River at West Spring-
  field and Springfield, Mass ......                                                                            254, 265. 44             $734. 56
Connecticut River at Hartford,
  Conn....----- -----.............                                                                              132, 166. 43               833. 57
Connecticut River Basin, surveys.                                                                               175, 000.001----------
Connecticut River, Vt., N. H., and
  Mass., reservoir construction ....                                                                                                  580, 000. 00
Nashua River at Fitchburg, Mass__               . . . . . . . . . . . . . .      . ..... . ....
                                                                                            . .   . . . . . 1 , 0 4-..2 , 3 8 7 . 2 3 756, 612. 77
Merrimack River at Lowell, Mass__ -....                     .....-----........
                                                                   -                       $246, 630. 42 .............                474, 369. 58
Merrimack River at Haverhill,
  M ass...... . . . . . . . . . . .                                             --.-............................
                                                                              -..                               982, 255. 62          737, 744. 38
Merrimack River Basin, N. H. and
   Vt..........................                                                                                                                  550, 000. 00
Lamoille River, Vt .......     .                                                                                                                  50, 000.00
Wallkill River, N. Y_                                                                            191, 000. 00                                    150, 000. 00
Hornell, N. Y., channel clearing....                                                                                     180, 350.48             227, 649. 52
Painted Post, N. Y., channel clear-
in.. .       .    .     .                                                                                                90,054. 25              24, 945. 75
                                                         --   - - - --
                                                         -- - ---                        -- - - -- --
                                                                                     -.-_--                 . -.-         93,895. 35              31,104.65
Oxford, N. Y., channel clearing...__                                                                                      42, 584. 15             32; 415. 85
Avoca, N. Y., channel clearing ..__                                                                                      144, 854. 06                 145. 94
New York and Pennsylvania, sur-
  veys for flood control           _ -------------- I---------
                                 ..--                                                              194,772 301----------
Susquehanna River and West
  Branch of Delaware River .. _____                                                                                      345, 000. 00              5, 000. 00
Susquehanna River at Kingston
  and Edwardsville, Pa-.._                                                                                               226, 074.71 1, 219, 925. 29
Susquehanna River at Wilkes-Barre
  and Hanover, Pa____ __. ___.                                                                                            37, 998. 43 1,822, 281. 57
Susquehanna River Basin, reser-
  voirs southern New York area_--                                                                                                 - 2, 249, 000.00
Susquehanna River, surveys along__                                                                                        30, 000.00----------
Anacostia River at Washington,
  D.C _._.                                                                                                           162, 000. 00----------
                                                                                                             ------------
Bolling Field, D. C-____-___                                                                                                                      50, 000. 00
Potomac River near Cumberland,
  Md._.                               --------------                                                                      45,   232.11             4, 767.89
Tar River, N. C_.__-.-                --------------                                       -------------- ------------
                                                                                                                     _                47, 500.00
Savannah River at Augusta, Ga__--__                                                        --------------                            144,000.00
                                                  --------------
                                                                                                                         ---------.. 141, 080.00
Coosa River at Rome, Ga ... ____                  --------------

West Point, Ga_                                   --------------
                                                                                                 591, 068. 24                              -----      -   -   -


B a yo u d e s Gla ises, La . . ._
                                 __.
                                  . . .. .        --------------
                                                                                                  --- ---- ----
                                                                                                ----                 --- ---
                                                                                                              -------------     50, 000. 00
Fire Point, La .. ___.___ __.....            ---------------                                                    .. ..------
                                                                                                 124,925.78 ------     ----- -------------
                                                                                                                .....   .-----
                                                                                                                             ------ --
Shreves Island, La..         ___. __.        --------------                                       81,046.90
                                                                                                                .. ..------ ----.--------
Grant Parish, La                                                                                 181,000.00
                                                  --------------
                                                                                                                ..... ------ ------------
Red Riper Cut-off, Colfax, La......               --------------
                                                                                                 155,000.00
Rio Grande--        -------------                      $41, 833.84


Big Black River, Miss...                   I----------------
                                                  $ ,----
                                                      833. I.---                       -I--------           ----------                           436, 000.00
Buffalo River, Miss...............              ----.        I                  .---------
                                                                                      I---------                I--------                         15,000.00
                                                       RIVERS AND HARBORS                                                                                         11

                                                                                                       Allotted


            Rivers and harbors                              National                Public                              Emergency Relief Acts
                                                           Industrial            Works Ad-
                                                            Recovery              ministra-
                                                              Act                 tion Act              1935 Act                      1936 Act             1937 Act


Mississippi River, Ashbrook to
  Greenville, Miss_                                                                                           $1,072. 00       -------------
Mississippi River near Rosedale,
  Miss           __-----------____                                                                                621.00       -------------
Mississippi River near Lake Prov-
  idence ---------------------------                                                                          22, 527. 51       ------------
Mississippi River, Shipland to
  Fitler_ _      -                                                                                                378. 00      -------------
Mississippi River near Greenville,
  Miss_                                                                                                       74, 123. 49      -------------
Sardis Reservoir, Yazoo River,
  M iss-. -._-
             ....- ---... ...... .....
Mississippi River and tributaries___ $43, 997, 440.31
                                                                                                          750,000. 00          -------------
                                                                                                                               -------------
Long Prairie Levee District, Ark___                                                                           19, 000. 00      -------------
Arkansas River, Pine Bluff to Jef-
  ferson-Lincoln County Line.....
Arkansas River at Tulsa, Okla___       -- ---------
                                                                                                           22, 732. 30
                                                                                                          191, 226. 47
                                                                                                                               -------------                $1, 773. 53
Arkansas River at Arkansas City,
  Kans-__                                                                                                     93,152.141----------
Arkansas River at Little Rock, Ark_                            --------
                                                                                                                                                            22, 000. 00
Arkansas River at North Little
   Rock, Ark------                                                                                                                                          35,000.00
Arkansas River, North Little Rock
                                                                                                  _ _ _...      ...
  to Gillette, Ark .-                   -                  -                    .. . ..     . . .                                                         100, 000. 00
Arkansas River, Plum Bayou to                                                                     -------------
  Gillette, Ark_----                                                                                                                                       90, 000. 00
                                                                                                  ------------
White River at Clarendon, Ark_                                     ............--                                          227, 000. 00                     5, 000. 00
White River at Newport, Ark_-                                  -                                                    -------------                          55,:000. 00
Bia'ck'Riverat SkaggS Ferry, Ark,_                                                                                                                         13,000.00
Village Creek, Ark_ _ ____                              _____                                            --   -   ---    ---
                                                                                                                                                           60,000.00
Conchas Dam, New Mexico .......                                                                                         2, 280,   000.OC                1,000, 000. 00
Denison Reservoir, Texas ...-..                                                                                            435,   000. OC
                                                                                                                               ---------              --
                                                                                                  ------------ ..............
Fort Supply Reservoir, Okla ---                                                                                                                           155, 000. 00
                                                                                                  -------------
James and Sheyenne Rivers, N.
  D ak .---........... --... ____.
Red River of the North_ .______                                                                                              44,500. 00
Belle Fourche River, S. Dak_ ...
Beaver Creek, Mont______ ___...__ _------------
                                                                    ....---------.                                  ....... ... .--.                          500. 00
                                                                                                                                                            14,
                                                                                                                    ....---------                          13, 400.00
Milk River at Glasgow, Mont-.....                                                                                                                          12, 900.00
Yellowstone River at Forsyth,
  Mont                   ----                                                                                                                              40,000. 00
Kansas Cities, Mo. and Kans., sur-
  v ey ...- ...........................                                       39,500.001 ....-------                ..............
Missouri and Kaw Rivers at Kansas
  City, model for Study of___                   .....                          12, 000. 00 ----- ---- --
Grand (Neosho) River at Iola,
  Kans - -                                                                                                          ..............                          6, 000. 00
Kansas River at Topeka, Kans ...-
Upper'1ississippi River, Ill_....                       --
                                                                                         r--
                                                                                ----------                                                                400, 00.  0R
                                                                                                                                                           47,'000. 00
Wilson, Wenkel, and Prairie du                                                                    -------------                -. .   .   - - - - -

  Pont Levee Districts, Illinois -- -                                                                                          - -    .     - - - -        29, 000.00
Perry Countydistricts nos. 1, 2, and                                                                       - - ---
                                                                                                        - --                    . .   .   - - - - -

  3, Mo -- - . . . .. . . . . . . .                                                                                 ..............                         56, 000. 00
Wabash River at Brevoort, Ind...                             -                                    -------------
                                                                                                  ------------- ..............
                                                                                                                                3,910, 000 00             243, 000. 00
Cumberland River, Tenn. and Ky_. ..............                                                                              56, 733. 21
Cumberland River near Middles-                                                                     ------------                lill .. ---                 52, 000.00
  boro, Ky ....             ....-- . ..---                                                                                     .. .... - ---
Monongahela River at Elizabeth,                                                                   -------------
  Rices Landing, etc__ _-------                                                                                                           $135, 555. 76
Allegheny River at Manorville,                                                                    -------------                            156, 108. 42
  Braeburn, and Mosgrove, Pa.....
Allegheny River at mile 15.3 and                                                                   ------------
  4 5 .2 ... .. . . . . . . . . . .. . . . . . . . . . . . . . .                                                                           103, 610. 14
Upper Ohio River, reservoir sys-                                                                    ------- - -
  tem . ............................                                                               ------- - -                             601, 900. 00   256, 500. 00
Ohio River at lock and dam no. 46-- .......                                           . ...
                                                                                                  -------------
                                                                                                                             12, 300. 0
Ohio River at lock and dam no. 47_.. ..............                                                                            6, 700. OC
Conemaugh River, Johnstown Res-                                                                    ------------                            100, 000. 00
  ervoir . . . . . .                         . .-----.       . .
Muskingum Valley, Ohio_ .....                                         27, 190, 000. 0 -------------
                                                                                                  -------------
Bluestone Reservoir, W. Va.........                                                                                         380, 582. 1-
New River, W. Va., survey._---.                                  _                                 ------------             164, 000.00
Green River, Ky___ _                                                                              -------------                2, 000. 0
Los Angeles County flood-control
  project, California....,.....                  __          ___        1,486,470.12                                  13, 004, 00. 00 3,910, 000. 00 6, 478,000. 00
Sacramento River, Calif-.._ -'__                          ....
Willamette River, Oreg---_                                         ------....                                               300, 000. 00                  275,940.00
Willamette River, Oreg., survey -..                                                                                         185, 000.00
Umatilla River at Pendleton, Oreg.                                                                                                                         30,000.00
12             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                                                Allotted


          Rivers and harbors                         National                 Public                    Emergency Relief Acts
                                                    Industrial           Works Ad-
                                                    Recovery                 ministra-
                                                         Act                 tion Act            1935 Act           1936 Act            1937 Act


Columbia River Basin, Oreg--------------------------
Cowlitz River Basin, Wash--             ------------------------------------------------------
                                                _____                      --------------
                                                                                                                                        $403, 158. 00
                                                                                                                                           75, 642. 00
Lewis River Basin, Wash___________                    __________   ---------------------------                                  76, 080. 00
Stilaguamish River, Wash----               --------------------                              --------------------------        86, 000. 00
Hoquiarh, Wash----      ---------------------------------                                          $182, 478.02 .---------------------
Whatcom       and    Padden Creeks,
  Wash --------------------                    ---------------------------                         15,656.83
'Clallam County streams, Washing-
  ton------ --    -------------------------------                             ------------        36, 617. 52-.....
,Salmon
Assistance
           River, Alaska-..--- ---------------------
              for educational, profes-
                                                                              $34, 231. 20 ............             _,              ----------

  sional, and clerical persons........             .__       ___                _-------------_______            $1,094, 602. 29             9,114. 64
      Total, flood control--------.......... $72, 767, 244. 27                 54, 231. 20 20, 272, 844. 32 10, 188, 358. 87 19, 942, 119. 49


                                               MISCELLANEOUS PROJECTS


Passamaquoddy tidal power proj-
  ect, Maine-----          -------         ------------------------    $6, 440, 208. 96
Conduit     Road,     Montgomery
  County, Md             ---------------------------------------------                                              $11,395. 47
Dalecarlia Reservoir, D. C--------........           $16, 944. 17_____
Repair break in water main, Intra-
coastal Canal, La--------------.......                  7,544.84--
Puerto Rico (roads and drainage)_ _.                1, 585, 000. 00 ...              .....                        ..----------------------------
Virgin Islands (swamp reclamation)_                      45, 000. 00         $109, 200. 00

      Total miscellaneous-.         _ _.....        1,654, 489.01             109, 200.00       6, 440, 208.96        11,395.47

      £Grand total_- -----         __-----_257, 930, 525. 99 93, 817, 285. 28 130, 520, 710. 57 10,199, 754. 34 $19,942,119.49


                                                                SURVEYS

   Reports on 150 preliminary examinations and surveys and 116
reviews of previous reports requested by resolutions of the committees
of Congress were submitted to Congress during the fiscal year. A
total of 187 of the 200 investigations authorized under the provisions
of House Document No. 308, Sixty-ninth Congress, first session, have
been transmitted to Congress. The supplemental investigations au-
thorized in section 6 of the River and Harbor Act of August 30,
1935, have been placed under way on a number of streams. These
investigations will be combined, when practicable, with the examina-
tions and surveys authorized in the Flood Control Act of June 22,
1936. Section 4 of the River and Harbor Act approved August
26, 1937, provides for 161 preliminary examinations and surveys,
.and section 5 of the Flood Control Act approved August 28, 1937,
provides for 114 preliminary examinations and surveys. An officer
and one :enlisted man were retained in Nicaragua to continue the
collection of hydrological and meteorological data-in connection -ith
the survey for an interoceanic canal across Nicaragua, the report on
which was transmitted to Congress December 10, 1931.
                                       MISCELLANEOUS                            CIVIL WORKI             ..

   Miscellaneous civil works under the Corps of n igneers are varied
in characterand include the administration of tle- Federal laws'en-
;acted for the protection and preservationof the navigable waters of
                     Retonciliation of hnds transferred
                  to Enineer Corps as of October 15, 1937.


E.vers & Harbors (Emergency funds)

       NIR .           ...   .   $138,5os,792.71
       PA.             ..
                             .     93,653, g54. os
       ERA .           .     *    1i3,07,657.29       $3o,970o,3o4.0o


Flood Contrcl                (Emergency Td.s)

       NIR. .                      72,767,24.27
       P A..  .                    "      54,231.20
        RA. (35)                   20,272, 844.32
       ERA (36)                     o,18, 35g. S 7
                                   10
       BRA (37)                    19,942,1193.43      123,224,793.15

icei   c   c   laneouOaL~'




       I R. . .                        1,654,9.o1
       PWA..                             109,200.00
       E A (35f)                       6,440,203.96
       ZRW (36)                           11,395.47

                                                      $512,410,395 .67

                                 Uwjliottedc            27,115,393.22

                                 'ot. av :ilthle..    $539, 525, 7.   9

                         Reconciliation of Emrergency     munds
                         trransferrred to En ineers an d a~ounts
                         allotted to Districts.
                       RIVERS. AND HARBORS                        13
the United States which govern the granting of permits for struc-
tures or operations in navigable waters, the approval of plans of
bridges, dams, dikes or causeways, the alteration of obstructive
bridges, the removal of sunken vessels obstructing or endangering
navigation, the establishment of regulations for the use, administra-
tion, and navigation of navigable waters including drawbridge regu-
lations, the establishment of anchorage grounds and harbor lines, the
pollution of the navigable waters by oil and other refuse matter,
the determination of the head of navigation and the extent to which
the laws shall apply to specific streams, and the supervision of the
harbor of New York to prevent obstructive or injurious deposits
in the tidal waters thereof, including the waters of Long Island
Sound; beach erosion investigations and studies in cooperation with
various State agencies; the establishment of reasonable rates of toll
for transit across bridges over navigable waters; the acquisition of
lands, easements, rights-of-way, and other interests therein by pur-
chase, condemnation, or donation needed for the prosecution of river
and harbor works, and the granting of leases and licenses for the use
and occupation of Federal property under control of the Corps of
Engineers; the construction of Anacostia Park and the reclamation
and development of Anacostia River and Flats, D. C.; the main-
tenance and repair of the Washington Aqueduct, and increasing the
water supply of the city of Washington; surveys and charting of the
northern and northwestern lakes, including the Lake of the Woods;
studies for the preservation of Niagara Falls and the supervision of
power companies diverting water therefrom; the carrying into effect
of the provisions of the convention between the United States and
Great Britain to regulate the level of the Lake of the Woods; and
reports of international boards on power-plant operations affecting
the St. Croix River, Lake Memphremagog, Lake Superior, Lake
Huron, and the St. Lawrence River.
     Appropriations.--The funds with which the works for the maintenance and improvemeniof rivers and h bors and
flood control were prosecuted during the fiscal year were derived from unexpended balances of appropriations Aade prior
to July 1, 1936] and from the following appropriation $iadeby the War Department aprop ation acts, and rom other
general and special appropriationacts, and from allotnments from various EmergencylReliefappropriation acts:

                                             Appropriation title                                                                           ate of appro-
                                                                                                                                          priation  act               Rivers and
                                                                                                                                                                       harbors                                Flood control             Miscellaneous               Total by appro-
                                                                                                                                                                                                                                                                     priation acts            0

                                                                                                                                                                                                                                                                                              H
War Department Civil Appropriation Act, 1938:                                                                                                                                                                                                                                                 C
                                                                                                                                                                                                                                                                                              O
    Maintenance and improvement of existing river and harbor works__------                                                            July 19,1937                $128, 000, 000. 00                                                        ___                    -------------'--           0
    Flood control, general. ....-- .. ..    ...  .      .             .....       . .. ... .         . .                             ----    do--       _.                                                    $30, 000, 00. 00
                                                                                                                ------...........
    Flood control, general (transfer to Agriculture) ...............
    Emergency Relief,   War,   Corps  of Engineers,
    Flood control, Mississippi River and tributaries
                                                    flood control,   general     (act
                                                                          ....-...
                                                                                      July
                                                                   ----.................
                                                                                          .
                                                                                            19,
                                                                                                 _
                                                                                                1937), 1938_
                                                                                                                                      .d ...__
                                                                                                                                     ---     do-
                                                                                                                                     ----. do -
                                                                                                                                                                              - - - -


                                                                                                                                                                              - - - - -



                                                                                                                                                              ..................
                                                                                                                                                                                          -   -.


                                                                                                                                                                                              -
                                                                                                                                                                                                   -


                                                                                                                                                                                                   -_--
                                                                                                                                                                                                               1 -500, 00. 00
                                                                                                                                                                                                               30, 000, 000. 00
                                                                                                                                                                                                               30, 000, 000. 00
                                                                                                                                                                                                                                   /__:
                                                                                                                                                                                                                                  diii
                                                                                                                                                                                                                                                                   =-----------------

                                                                                                                                                                                                                                                                   ---------------- "
                                                                                                                                                                                                                                                                                              t
    Emergency Relief, War, Corps of Engineers, flood control, Mississippi River and tribu-
      taries (act July 19, 1937), 1938 __---                                                           - -                               do -- ---
                                                                                                                                      ....                                                                     15, 000, 000. 00
    Emergency fund for flood control on tributaries of Mississippi River_                            -                                                                                                             300, 000. 00                                    ----------     -   -   -

                                                                                                                                                                                                                                                                                              z
    Flood control, Sacramento River, Calif___ __________
    Flood control, Lowell Creek, Alaska___________
                                                                                                                                      ---. do .. ....
                                                                                                                                      -      do      -.. ..
                                                                                                                                                                                                                   814, 500. 00
                                                                                                                                                                                                                     1,000. 00       V...                          ----------------- '




    Flood control, Salmon River, Alaska___________                                                                                     ..d do,_
                                                                                                                                     ....   o .......                                                                  800. 00
                                                                                                                                                                                                                                                                                               r
      Total...--.........       ...... ......   ...... ...... .....
                                                                 -------------
                                                                            --------------------                                                                    128, 000, 000. 00                         105, 616, 300. 00         -                             $233, 616, 300. 00      ci



Second Deficiency Appropriation Act, fiscal year 1937:                                                                                                                                                                                                                                         O
    Flood control, Mississippi River and tributaries                    -------------------------------                               May 28,1937                                       _                       1, 000, 000. 00         ------------                      1,000, 000. 00
                                                                                                                                                                                                                                                                                               M
Indefinite appropriations (warrants issued during fiscal year 1937):
    Operating and care of canals, etc-                                                              ---------                         Mar.          3, 1909                   -2, 017. 56
                                                                                                                                                                                                                                                                                               U
    Removing sunken vessels, etc--                 ------------------------------------------- Mar. 3, 1899                                                                       -20. 02                 -                       ...

      Total........   -----------------------------
                         .... ......                                              -..........
                                                                                     -...........
                                                                             -...........                                                           _                         -2, 037. 58              -_                                                                   -2, 037. 58

Allotments made from emergency appropriation acts:
    National Industrial Recovery, War, rivers and harbors, 1933-39- --....-----. ---     June 16, 1933                                                                   -320, 358. 74                                                             ........-                          _._
    National Industrial Recovery, War, flood control, 1933-39----...... -------------------- do .                                                             -----------------.                                1, 600, 000.00
      Total............... ... .......                 .                 .....
                                                                   .......   . . ..                                                            .....                     -320, 358. 74                          1,600, 000. 00----           __                          1,279,641.26

    Public Works Administration, allotment to War, rivers and harbors, 1935-39 ........----------.June 19, 1934                                                          -199,          400. 59                                                                           -- 199,400.59

    Emergency Relief, War, rivers and harbors, flood control, etc., 1935-37 --.......----------  Apr. 8,1935                                                        -1,165, 409. 38                             3, 242, 931.65                  ..........            --...........
    Emergency Relief, War, administrative expenses, 1935-37 ---- ...         .... ,,............ -....
                                                                                                     do.......                                                          -19, 130. 36                      -..
    Emergency Relief, War, Corps of Engineers, assistance for educational, professional and
     clerical persons, 1935-37....--.  ..     . . . .                ..     .                    -_do.....----                                                    -.-.-.-............                               50,000.00           --


      Total             -----        -----         -------..........................                .....................           ...............                  -1, 184, -11459
                                                                                                                                                                              539. 74                           3, 292, 931. 65         ...------.....--       .          2, 108, 391. 91
           Emergency Relief, War, Corps of Engineers, flood control, and other conservation,
            1936-37... ...............              ...    .....-------------------------------------------------------------.. June 22,1936 -----------------................--6, 930, 280. 00
           Emergency Relief, War, Corps of Engineers, flood control, and other conservation (non-
            Federal projects), 1936-37            - -------------------------------                    ---------------- do-------.......................                        4, 603, 232. 48..............
t          Emergency Relief, War, Corps of Engineers, assistance for educational, professional and
            clerical persons, 1936-37...   --------------------------------------------------- do.....---------                                                            ---------------
                                                                                                                                                                                2, 454, 194. 81
e
    +


           Emergency Relief, War, Corps of Engineers, highways, roads, and streets, 1936-37...--------- .. do ...-------......------------------.                                  448, 000. 00             11, 442. 00
             Total.....             -----------------------------------------------------------------------------------------                                                   14, 435, 707. 29           11, 442. 00          14, 447, 149. 29
             Grand total all appropriated funds ______-______________________                                                      ____126,                 293, 663. 35       125, 944, 938. 94           11, 442. 00         252, 250, 044. 29

I-'         1$500,000 transferred from "Flood control, general" to the Agriculture Department as provided by the act of July 19, 1937.                                         Other minus amounts represent revocation of un-
        obligated balances of allotments that were made to the Corps of Engineers prior to July 1, 193'
                                                                                                                               7



             The following amiounts have been advanced by local interests for river and harbor improvements under the pro-                                                                                                                         N



        visions of section 11, River and Harbor Act, March 3, 1925, and are returnable to the same interests when neces-                                                                                                                           -c
        sary Government funds are available:

                                                                                                                                                            Balance due            Amount re-           Amount re-             Balance due
                                                Project                                                                    District                         from United           ceived during         turned dur-
                                                                                                                                                             States, June           fiscal year        ing fiscal year           30, 1937
                                                                                                                                                               30, 1936                                                          30, 1937

        Qalveston Harbor, Tex      ---------------------------------------                             Galveston, Tex----                                           $100, 000 ----------------                 $100, 000
        Channel from Pass Cavalle to Port Lavaca, Tex       ___        _                                                -------------------
                                                                                                        _-----------------------do                                    12, 000 --------                           12, 000 -------------
             Total......-....----------------                                                                                                                 000
                                                                                                                                        ------------............
                                                                                                                                                          112,000112,                                           112, 000   -
     E penditures.-The total amount actually expended under the direction of the Chief of Engineers in connection                                                                                                                                                tS


with the maintenance and improvement of rivers and harbors, flood control, and other miscellaneous works during
the fiscal year ended June 30, 1937, is as follows:

                                                       Appropriation title                                                            Appropriation                                       Expenditures
                                                                                                                                                                 New work
                                                                                                                                                                                          Maintenance                                 Total                     O

Rivers and harbors:
   Maintenance and improvement of existing river and harbor works----------                                                                      Annual          $73, 670, 346. 62            $37, 718, 342. 29L,                   $111,388,; 688. 91      0
   Maintenance and improvement of existing river and harbor works, emergency construction, act of
     July. 21, 1932 _.----------   .--.       ---   ------------------------------------ ------------                                  July 21,1932                    50, 220. 58                                                         50, 220. 58
   Experimental towboats for Mississippi River and tributaries-_          . .- __-----_        ..-  -                                  June 25, 1910                    4, 089.61                                                           4,089. 61
   National Industrial Recovery, War, rivers and harbors, 1933-39 _________          __________                                        June 16,1933                4, 796,015.36                         30, 036. 31                   4,826,051. 67
   Public Works Administration allotment to War, rivers and harbors, 1935-39          -                                                June 19, 1934              25, 684, 362. 16                       28, 288.86.                  25, 712, 651. 02      -
   Emergency Relief, War, rivers and harbors, flood control, etc., 1935-37___________                                                  Apr. 8,1935                36, 588, 582. 86                      223., 009. 22                 36,'811, 592.08
   Emergency Relief, War, administrative expenses, 1935-37. ..         __________________________                                     ....do ------                    27, 167. 15                         4, 619. 77                      31, 786.92
     Total, all riversand harbors -. _                             _    ------------------                                                                       140, 820, 784. 34                38, 004, 296.45                    178, 825, 080. 79
Flood control (projects authorized in act of June 22, 1936, and unauthorized projects):
    Emergency Relief, War, rivers and harbors, flood control, etc., 1935-37___                                                            Apr.     8,1935          6, 457, 598. 77    ...............--                                6, 457, 598. 77          Z
    Emergency Relief, War, Corps of Engineers, assistance for educational, professional, and clerical
     persons, 1935-37_---
                      .                 .      .                                   -         -        .
                                                                                                     -..-..-. .          .        .        _ do . . .                  43, 481.63                                                          43, 481. 63
   Emergency Relief, War, Corps of Engineers, flood control, and other conservation, 1936-37 _______                                      June 22, 1936            3, 573, 423. 25                                                     3, 573, 423. 25
   Emergency Relief, War, Corps of Engineers, flood control, and other conservation (non-Federal
     projects) 1936-37---..........-----------------                                                                                  .    -.. do .      .----     2, 827, 617. 66                                                     2,827,617. 66
   Emergency Relief, War, Corps of Engineers, assistance for educational, professional, and clerical
    person s,1936-37---
                    .........    ---------------------- -------------------.                        . -                                       do                   2, 202, 228. 20 -                    -                -             2, 202, 228. 20      c

   Emergency Relief, War, Corps of Engineers, highways, roads and streets, 1936-37_...__  _________                                           do   - -                364, 560. 84 -                                                      364, 560.84
     Total, floodcontrol,     .....-............................
                        general                                                                                                                                   15, 468, 910. 35                          - ----       --           15, 468, 910. 35
Flood control, Mississippi River:
    Flood control, Mississippi River and tributaries------------------------                                                                   Annual             24, 386, 890. 15                 3, 316,533.12                      27, 703, 423. 27
    Flood control, emergency construction, act July 21, 1932_                                        --                                   July 21, 1932                14, 341. 66                      6, 609.95                          20, 951. 61
   Emergency fund for flood control on tributaries of Mississippi River-------_    __
                                                                             ..........                                      . ..              Annual                 328, 767. 48                     21, 608. 39                        350, 375. 7_- -
    National Industrial Recovery, War, flood control, 1933-39-_-----                                                                      June 16, 1933               473, 515. 91                ..-...-...                              473, 515.
                                                                                                                                                                                              I                                 i


     Total flood control, Mississippi River......... ___..                    . _                                                                                 25, 203, 515. 20                 3, 344, 751. 46                    28, 548,.266. 66          -+

Flood control, Sacramento River, Calif.:                                                                                                                                       ___
                                                                                                                                                                                __   I_   _                 __       .        -j_                               -.8
    Flood control, Sacramento River, Calif__ _______ _____-_______ .         _____________________                                             Annual                 903, 832. 36                          56, 043. 4            959, 875. 60
    National Industrial Recovery, War, flood control, 1933-39--------
                                                            .........-....--...-..------- .                                               June 16, 1933               -1, 208.82                  . .               .--------------------
                                                                                                                                                                                                                                   -1, 208. 82
     Total flood control, Sacramento River_ .                ...               1       _.. -     _     . ___      ____       __                                       902, 623.54                           56, 043. 24                   958, 666. 78
    Flood control, miscellaneous:
        Flood control, Lowell Creek, Alaska---....  ----       ---.----...--             -----                                       May 15, 1936            --- --- --- --- --                  7, 559.90                7, 559.90
        Flood control, Salmon River, Alaska_ _____       .___________._______________________________                            --.        do ---.....                                             727. 95                  727.95
        Flood control, Missouri River at or near Niobrara, Nebr _                                                                 ---. do- ..--                      99, 269. 80                                         99, 269. 80
        National Industrial Recovery, War, flood control, 1933-39:
            Muskingum River Valley Reservoirs ..         _-__                                                                     June 16, 1933                   9, 989, 545. 45
                                                                                                                                                                                              ----------             9, 989, 545. 45
            Kansas River, Kans.-Survey -.......           ....              -.
                                                                        ____........
                                                                        .......---                  --...-                        --.. do -_-.                        12, 000. 00                                        12, 000. 00
              Total flood control, miscellaneous_.................__                          .    .               .                                             10, 100, 815. 25                8, 287. 85         10, 109, 103. 10    i




              Total, all flood control----------        ---------                  ---------------------------------             .   ....     .....--            51, 675, 864. 34          3, 409, 082. 55     9    55, 084, 946. 89

S   1ndefinite appropriation:
        Operating and care of canals, etc     --.........----       ....------..                              ..       .......       Mar. 3,1909             -------------                       4, 315. 71               4, 315. 71

    Miscellaneous appropriations:
       Protective works and measures, Lake of the Woods and Rainy River, Minn ..           _..                                    Aug. 12,19351 1                     40, 157. 45 -             --                       40, 157.45
       Interoceanic canals_ _     _____-______                                                                                    Mar. 4,19291                                                    2, 187. 30              2, 187. 30
       National Industrial Recovery, Interior, Division of Territories and Island Possessions (transfer to
          W ar), 1933-37 ...__ ___--_ _-_        -        -       -         -      -       -       -                              June 16,1933                         7, 656. 16      _      --------                    7, 656. 16        I
                                                                                                                                                                                                                                                    M



       Emergency Relief, War, Corps of Engineers, highways, roads, and streets, 1936-37                                           June 22, 1936                       11, 395. 47     _                                  11, 395. 47

          Total miscellaneous appropriations-....        ._                 _...._                                          __                                        59, 209. 08                2, 187. 30              61, 396. 38            !




                                                                                                                                                                                                                                                F~



          Total expenditures, Government funds--__--.-----                    -            _-..                                                                 192, 555, 857. 76          41, 419, 882. 01        233, 975, 739. 77:

    Contributed funds:
       Funds contributed for improvement of rivers and harbors, trust fund ...........................                                       (2)                     197, 032. 69              58, 790. 38,             255, 823. 07
       Funds contributed for flood control, rivers and harbors, trust fund_________________________________                                  (2)                  2, 961, 514. 60                  200. 00           2, 961, 714. 60
          Total contributed funds_ -     -         -   .-                                                                    .                                    3, 158, 547. 29              58, 990. 38           3, 217, 537. 67            I




                                                                                                                                                                                                                                                    w
                                                                                                                                                                                                                                                        1




          Grand total expenditures, all funds           ....    .    -------
                                                                    ......           ...                                .                               -1      195, 714, 405.05       41, 478, 872.39             237,193, 277. 44

        1 Second deficiency act.
        S'Trust funds.




                                                                                                   /~
                                                                                                  i.W1~   .




                                                                                                                             j
                                                                      Consolidated cost and financial summary as of June 30, 1937

                                                                                                              Value of                                                                                                             Additional
                                                                   Cost of new         Cost of main-plant,  stocks,               Plus            Minus               te expendi-
                                                                                                                                                                  Total                     Balance
                                                                                                                                                                                              ne                 ot to be
                                                                                                                                                                                                               Total                  amount
                                                                                                                                                                                                                                      required
                                                                                                      and undis-               accounts          accounts
                                                                     work                tenance       tributed                receivable        payable               tures              unexpended          accounted for           for com-
                                                                                                         items                                                                                                                         pletion

                                                                                                                                                                                                                                                 z
Seacoast harbors and channels ..__ _.__.__..                 $533, 548, 090. 33 $220, 927, 365. 64          $2, 885, 936. 77 $148,935.      66 $2, 899, 947. 96 '$754, 610,380. 44 $8, 255, 146. 24 $762, 865, 526. 68 $102, 818,000
Intracoastal canals and other waterways_- -_                   179, 254, 039. 04         58, 565, 330. 58       712, 912. 39       48, X63. 53 3, 760,171.28 * 234, 820, 874. 26 13,658,897.74 248, 479, 772. 00 38, 437, 000
Mississippi River system- _ _- __...--              .---.- 683, 264, 874. 69 204, 456, 728. 62              15,811,582.88        141, 570. 73 8, 224, 214. 03 895,450, 542. 89 39, 960, 971. 61 935, 411, 514. 50 95, 127, 000                   -4
Lake harbors and ch.annels_______________                      193, 573, 686. 83 64, 598, 264. 62               262, 976. 42     174, 440. 54      946, 012. 53 257, 663, 355.88 2, 709, 011. 50 260, 372, 367. 38 19, 914, 000                  O



Examinations, surveys, and contingencies
Removing sunken vessels___________---
                                                        ----        6, 883, 365. 29
                                                    -- _ ..-.----------.-6, 737, 886. 85
                                                                                         34, 234, 381. 14        75,774.23         34, 038. 55
                                                                                                                             ............
                                                                                                                                                   164, 130. 81 * 41,063,428. 40 2, 644, 784. 11
                                                                                                                                                                 * 6, 737, 886. 85
                                                                                                                                                                                                      43, 708, 212. 51 ..571, 120, 000
                                                                                                                                                                                                       6, 737, 886. 85
Dam no. 2, Tennessee River:
    Construction ....... __----------------                      46, 613, 947. 62            359, 592. 52                                                         -    46, 973, 540. 14                        46, 973, 540. 14   ............
    Operating and care of hydroelectrical de-
       velopment_-_...              ---------------                                       1, 711, 656. 48                                                               1, 711, 656. 48                         1,711,656.48
                                                                                                                                                                                                                                  ............
Passamaquoddy tidal power project. Maine___                         2, 651, 110. 91                          3, 653, 787. 43    66, 310. 16        7, 423. 53           6, 363, 784. 97       106, 215. 03      6, 470, 000. 00
Permanent International Association of Con-                                                                                                                                                                                                      O


  gresses of Navigation     .....
                           _.....____......__             .446,974, 120. 35                   68, 574. 94                                                                   68, 574. 94                             68, 574. 94
Flood control--        _----------------------- __446, 974,120. 35 83, 350, 176. 31                          4, 055, 917. 64 1, 198, 072. 60 4, 082, 284. 64          531, 496, 002. 26 23, 794, 666. 96      555, 290, 669. 22 571, 120, 000
Interoceanic Canal survey -- ._.......   _-_...            ...............                   135, 289. 88                                                                  135, 289. 88      14, 710. 12           150, 000. 00 ............
Plant:
    River and harbor ....    __....___...-----    -       ...............           ....-           -.
                                                                                                   ....     37,202,270.55 2, 916, 932. 53 2, 273, 242. 90 , 37, 845, 960. 18                3, 538, 329. 93    41, 384, 290. 11    ...........
    Flood control............------------------..                                                           16, 202, 060. 40 691, 926. 10    522, 918. 06   16, 371,068. 44                 1, 697, 564. 54    18, 068, 632. 98                  w
       Total ...........              .....---- .........---     2, 092, 763, 235. 06 675, 145, 247. 58 180, 863, 218. 71 5, 420, 990. 40 22, 880, 345. 74 2, 831, 312, 346. 01 96, 380,297. 78 2, 927, 692, 643. 79 827, 416, 000
Unallotted balances June 30, 1937:
   Maintenance and improvement of existing
                                     . ..
     river and harbor works .___________--                                                                                                                                                  4, 958, 116. 07     4, 958, 116. 07 ....------
   Flood control, Mississippi River and                                                                                                                                                                                                          I-4
     tributaries_....----------------------.                                                                                                                                                    47, 367. 26         47, 367. 26 ....---..        4
   Emergency funds for flood control on
     tributaries of Mississippi River ___.__ .......                            . ............-                                     --.....-..                                                280, 349. 39         280, 349. 39 ....-----        C4
          Total ......------.......---------------------                  ...                                ......                                 .       .5,                               285, 832. 62      5, 285, 832. 62 ..........

Funds made available subsequent to June 30,
1937:
   Maintenance aid improvement of existing
     riv e r an d h a rb o r w ork . . . . ..-- . . . . .. . .
   Flood control, Mississippi River and
                                                                 ------------ ---------- --                                                                        ---------              128, 000, 000. 00   128, 000, 000. 00

     tributaries...---       ----------------- ----
   Emergency funds for flood control on
                                                                              -------- ---
                                                                 -~---'-----------                                                                                --------------           45, 000, 000. 00    45, 000, 000. 00

     tributaries of Mississippi River ...                   __                                                                                                                                300, 000. 00         300, 000. 00
Flood control:
    Muskingum Valley Reservoir, Ohio _--                         - - - - - - - - - -               ---------------                                                                                                                             1, 600, 000.00           1, 600,000.00
    Sacramento River, Calif..........                        - - - - - - - - - - - --        - -
                                                                                                                                                                                                               - -- -- -   - -
                                                                                                                                                                                                                                                  814, 500.00              814, . 00
    Lowell Creek, Alaska................                     -     - -         - -
                                                                                                                                                                                                    --------,---_-
                                                                                                                                                                                                                                                    1,000.00                 , , 00k.00
    Salmon River, Alaska -..............                     - - -       - -     - -
                                                                                                                                                                                                    ------            -    -
                                                                                                                                                                                                                                                       800. 00                            . 00

    Projects in act of June 22, 1936.......-------           - -     -     - - - - - -   -     -                                                                                                    --------------                            60, 000, 000. 00        60,   000,   003.    00

                                                                                                                                  --     I
                                                                                                                                       li--~ ---------
                                                                                                                                                  --     ;-   l   ---     I--
                                                                                                                                                                           --      ---              I--                               -   -      -~-;------      le         L   ----




       Total...........................                                                                                                                                   1----_--I.........                                              25, 716, 300. 00            235, 716, 300 .00-           --
       Grand total- ------.--.------------                           .....                            .........................                                         ........                          .-.-.......--    ------         337, 382, 430. 40      3,   168, 694, 776. 41                  ..


1 Of this amount, $54,177,265.76 represents the value of plant distributed as follows:

                                                                                                                                                                                                                                 Construction                    Service                         Total
                                                                                                                                                                                                                                    plant                         plant

       River and harbor.        ------------------------------------------------------------------------------                                                                                                         $31, 641, 245. 12      $8,255, 257. 88      $39, 896, 503. 00
       Flood control.................................               .........................................                                                                             ................----------------------------------------------------------------------------------
                                                                                                                                                                                                                         10, 452, 157. 63      3, 828, 605. 13      14, 280, 762. 76
              Total.......................................                                                                                                                               .................                          42, 093,
                                                                                                                                                                                                                                        093,---------------------------------------------------------------------------
                                                                                                                                                                                                                                             402. 75    12, 083, 863. 01       54, 1 265. 77,76        4
20          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The amounts that can be profitably expended during the fiscal year
ending June 30, 1939, are as follows:
Maintenance and improvement of existing river and harbor
  works:
    New work-----------------------------------------------                            $100, 753, 124
    Maintenance---------------------                                                     46, 692, 585
         Total, river and harbor_--------------------------___                          147, 445, 709
Flood control work----------------------------                                          127, 844, 610
         Total to be appropriated ______________--------__                              275, 290, 319
  The War Department Appropriation Act approved April 26, 1934,
made a lump-sum appropriation of $23,966,645 for river and harbor
improvements throughout the country. Certain allotments amount-
ing to $23,838,797.67 were made from this appropriation and reported
in previous annual reports, leaving an unallotted balance of $127,-
847.33. In addition, certain sums previously allotted have been with-
drawn and reallotted as follows:
Amount unallotted as shown in Annual Report for 1936  ______                            $127, 847. 33
Amount withdrawn for reallotment elsewhere_ _____________-                             1,054, 906. 17
                ,
         Total __                --        ----                                            1, 182, 753. 50
Allotted to-
    Plant, Boston district______________________- -        -   -    -_                         1, 000. 00
    Tarrytown Harbor, N. Y------------------------------------                                 2, 791. 91
    Inland waterway, Delaware River to Chesapeake Bay                       --------         107, 641.85
    Mantua Creek, N. J__________________---------------------------------------                2, 947. 40
    Twitch Cove and Big Thoroughfare River, Md- __-_______                    --               2, 000. 00
     Silver Lake Harbor, N. C --                  -------                   -          -       2, 000. 00
     Channel from Thoroughfare Bay to Cedar Bay, N. C-----                                     4, 000. 00
     Beaufort Harbor, N. C ___________-_________-       _  ,_-9,                                  000. 00
     Plant, Wilmington, N. C., district ______ ______________                                 47,000. 00
     Congaree River, S. C------------ ---------------------------                              3, 500. 00
     Plant, Savannah, Ga., district__________________________                                 25, 000. 00
     St. Johns River, Jacksonville, Fla., to the ocean ........-_                            159, 415. 78
     Lake Worth Inlet, Fla _________________________________                                   2, 838. 96
     Caloosahatchee River and Lake Okeechobee drainage areas,
        Florida------------------------------------------------                              175, 000. 00
     Examinations, surveys, and contingencies (general) :
          Jacksonville district -----------------------------------                           20, 000. 00
          Galveston district.____                                   __-
                                                                 -___                          1__________-
                                                                                               1, 308. 56
          Memphis district___________         __________________
                                               -                                              29, 500. 00
     Plant, New Orleans district_____________________1-_____                                  19, 332. 62
     Plant, St. Louis district________________________       ___                              30, 601. 30
     Plant, St. Paul district ________________________11___,                                      398. 70
     Plant, Huntington district__________ ___-_______________                                  8, 500. 00
     Plant, Detroit district_---__          -___________-________                             30, 000. 00
     Plant, second Portland district --.                        ---------                      5,000. 00
     Plant, Seattle district__                                                                  5, 364. 94
     Examinations, surveys and contingencies (general), Detroit
       district______---------------------------------------------                            15, 000. 00
     Ontonagon Harbor, Mich___                                                                 2, 827. 24
     Sandusky Harbor, Ohio___________________________           __-15,                            000. 00
     Huron Harbor, Ohio_________________________________         __                            7, 000. 00
     Lorain Harbor, Ohio__________________       ________________                              2, 000. 00
     Cleveland Harbor, Ohio _____________________________                         _           25, 000. 00
     Buffalo Harbor, N. Y____                                        23,000.00
          OwgHabrN.Y--------------------------------------23, 494.051
     Oswego Harbor , N. Y__      __________________                  70, 494. 51
     Missouri River, Kansas City, Mo.-Sioux City, Iowa---------_     40, 078.66
     Petaluma  Creek, Calif_         __ __ __,     _
          PtuaCreCalif--------------------------------------1711.             07
                                                                     51, 711.07
     The Dalles-Celilo Canal, Oreg. and Wash-....      ______----     7, 500. 00
     Grays Harbor and Chehalis River, Wash____--------               30, 000. 00
            Total---------------------------                      1,102, 753. 50
     Balance unallotted------------                                                           80, 000. 00
             Total.---------                                -                              1, 182, 753. 50
                                    RIVERS AND HARBORS                                                 21

  The War Department Appropriation Act approved April 9, 1935,.
made a lump-sum appropriation of $34,057,270 for river and harbor
improvements throughout the country. Certain allotments amount-
ing to $33,924,790.01 were made from this appropriation and reported
in previous annual reports, leaving an unallotted balance of $132,-
479.99. In addition, certain sums previously allotted have been with-
drawn and reallotted as follows:
Amount unallotted as shown in Annhal Report for 1936----                                   132, 479. 99
                                                                                         $------
Amount withdrawn for reallotment elsewhere___----------------                           1,429, 746. 76

      Total-------------------------------------------------                            1, 562, 226. 75
Allotted to--
    Plant,     Boston. district___---------------------_                                     1, 500.00
    Bronx River, N. Y ---------------------------------------                              23,000. 00
    East River, N. Y------------------------------------------                              8, 472. 90
    Potomac River below Washington, D. C___________ ______-_                                6, 443.48
    Ekiainations, surveys, and contingencies (general), Wash-
      ington district--_------------------------------------                                10, 000. 00
    Waterway from Pamlico Sound to Beaufort Harbor, N. C____                                12, 000. 00
    Waterway'from Beaufort to Cape Fear River, N. C____-                                     7, 147.91
    Morehead City Harbor, N. C--------------------------------                               5, 000. 00
    Northeast (Cape Fear) River, N. C--------------------                                       920. 63
    St. Johns River, Jacksonville, -Fla., to the ocean                             --        8-----------
                                                                                          -- 8100.    97
    Calo1sahatchee River and Lake Okeechobee drainage areas,
       Fla   ----                                                                            5, 000.00
                                                                                           7---------------------
    Taiipa Harbor, Fla ..        ..-                                                       16, 255. 94
    Waterway from Choctawhatchee Bay to Pensacola Bay, Fla _-                               7, 000. 00
    Removing water hyacinth, State of Alabama__-----__--                                    1,000.00
    Mississippi River from Baton Rouge to New Orleans, La                                   5, 000. 00
    Louisiana-Texas Intracoastal Waterway (New Orleans-Sabine
      River section) --              --           -_                                       41, 000. 00
    Waterway from Franklin to the Mermentau River, La                          ------      15,000.00
                                     ---
    Platf, New Orleans, La., district__                      ------                         4, 667. 38
    Examinations, surveys, and contingencies (general):
       Galveston district ----------    -    --                                             5, 000. 00
        Memphis          district         -----                       --   -               10, 500. 00
    Plant, St. Louis district                                            000. 00
                                                                   1-------------------------------
    Mill Creek and South Slough at Milan, Ill--------------------     1, 067. 89
    Missouri River:
         Kansas City, Mo., to the mouth---------------------       356, 100. 00
        Kansas City, Mo., to Sioux City, Iowa--------        -___   57, 479.99
    Examinations, surveys, and contingencies (general):
        Fort Peck district-------------------------------------       1, 196. 78
        Nashville district-------------------------------------17,       988. 13
    Ohio River, lock and dam construction                             1, 500. 00
    Kanawha River, W. Va--------------------                         20,000. 00
    Kentucky        River,   Ky      _                 ---                                  1,  000. O
                                                                                            1---------
    Examinations, surveys, and contingencies (general) :
        Huntington district---------------------------------                               20, 000. 00
        Cincinnati district--------------------------------_    -----                       8, 500. 0(0
    Plant, Huntington district----------------------------------                           20, 000. 00
    Channels in Lake St. Clair, Mich                                                                 00
                                                                                           1---------------------
                                                                                           13,000.
    Grand Marais, Harbor of Refuge, Mich                                                    4, 000. 00
    Buffalo Harbor, N. Y-------------------------------------                              10, 000. 00
    Examinations, surveys, and contingencies (general):
        First Portland district ---------------------------------                           5,025. 42
        Second Portland district -------------------------------                            5, 500. 00
    Columbia River at Bonneville, Oreg ----------------------                              97, 100. 34
    Swinomish Slough, Wash----------------------------------                                2,500. 00
    Plant, Seattle, Wash., district__________________________                               4, 970. 49
22           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Allotted to--Continued.
    Plant, Honolulu, Hawaii, district __.._____________-___                                            $4, 947. 88
    Surveys (H. Doc. No. 308, 69th Cong., 1st sess.) --------------                                    58, 978. 00

            Total----------------------------------     ------                                   1, 134, 364. 13
      Balance unallotted -----
                             ___--__________-    -____-________-                                    427, 862: 62

                Total---------------------------------------------                                   , 562, 226. 75
  The War Department Appropriation Act approved May 15, 1936,
made a lump-sum appropriation of $159,427,899 for river and harbor
improvements throughout the country. Certain allotments amount-
ing to $138,977,751.67 were made from this appropriation and re-
ported in a previous annual report, leaving an unallotted balance
of $20,450,147.33. In addition, certain sums previously allotted have
been withdrawn and reallotted as follows:
Amount unallotted as shown in Annual Report for 1936 _...... $20, 450, 147.33
Amount withdrawn for reallotment elsewhere---------------      6, 438, 018. 11
         Total ------------------------------------------------                                26, 888, 165. 44
Allotted to:
     New Harbor, Maine ..--.--------------------------------                                           2, 566. 27
     Kennebec River, Maine_----          ------           -        -         -      -     -      -     5, 727. 16
     Saco River, Maine ____---                 ---------------                                        45, 583. 15
    K     b     k River, i     e--------_              ------------------------                            497.47 ,
    Newburyport Harbor, Mass-------------------------------                                           21, 000. 00
    Gloucester Harbor and Annisquam River, Mass.----                                   --
                                                                                       _     -          1, 475. 89
    Mystic River, Mass--------------------------------------                                          35,000.00
     Boston Harbor, Mass -- -----------------------------------                                       14, 349.38
     Weymouth Fore River, Mass _......_____                    .............             __           29, 500. 00
     Cape Cod Canal, Mass----              _____-              -____---______-                       846, 000. 00
     Examinations, surveys, and contingencies (general), Boston
       district------------------------------------------------                                        27, 372. 01
                                _----------...
                                _
     Plant, Boston district_ ----.-        --                                                    -     48, 000. 00
     Chatham (Stage) Harbor, Mass-------------------------                                             23, 500. 00
     Vineyard Hav'en Harbor, Mass------                         __ __-__ __                            27, 186. 12
     Providence River and Harbor, R. I-----                                                            20, 000. 00
     Connecticut River below Hartford, Conn-------------------                                        288, 500. 00
     Stamford Harbor, Conn ______ __ __-_____                                         ___-            125, 000. 00
     Examinations, surveys, and contingencies (general), Provi-
       dence district------------------------                                                          16, 654. 69
     Plant, Providence district---------------------------------                                       29,,00.00
     Great South Bay, N. J--- -_____________--       -       -        -        _______--       -       39, 000. 00
     East River, N. Y --------------------...-..--------                                    -__        42, 527. 10
     Tarrytown Harbor, N. Y.---------------------------------                                          11, 808. 09
     Peekskill Harbor, N. Y----------------------------------                                          10, 000. 00
     Harlem River, N. Y-------------------------------------                                           51, 000. 00
     Hudson River, N. Y-------------------------- -----------                                          55, 000.00
     Burlington Harbor, Vt                                                                             10, 000. 00
     Examinations, surveys, and contingencies (general), first
       New York district-------------------                           -           -     -___          160, 000. 00
     Plant, first New York district.______
                                         --         ___         _____-______-_                        376, 619. 73
     Raritan River to Arthur Kill cut-off channel, N. J--------                                        96, 000. 00
     Shoal Harbor and Compton Creek, N. J ________________-                                             8, 000. 00
     Shrewsbury River, N. J---------------------------------                                          200, 000. 00
     Manasquan River, N. J------------------__------------                                             16, 760. 06
     Plant, second New York district___-- _--___                    _______-----                       23, 006.00
     Delaware River between Philadelphia, Pa., and Trenton,
       N. J--------------------------------------                      -----------                     99, 000. 00
     Delaware River, Pa., N. J., and Del., Philadelphia to the sea_                                   265, 000. 00
     Raccoon Creek, N. J----------------------------------              __                             20, 823. 68
     Absecon Inlet, N. J_ -------                ___--_                 ___-----_100,                      000. 00
     Wilmington Harbor, DeL-- --                 __-_--_-               - _ -_-- -__11,                    000. 00
                                  RIVERS AND HARBORS                                               23
Allotted to-Continued.
     Inland waterway, Delaware River to Chesapeake Bay, Del.
       and Md------------------------ ----------------------- $982, 358. 15
     Mantua Creek, N. J----------____--_------------------                              4, 676. 32
     St. Jones River, Del .       .            _____----------------------------4, *405-.O
    Inland waterway, Rehoboth Bay to Delaware Bay, Del ___.                         170, 000. 00
     Examinations, surveys, and contingencies (general), Phila-
       delphia district ------------------------------------------                    75, 000. 00
     Plant, Philadelphia district--------------------------------                     86, 744. 43
     Wicomico River, Md___-------------------------------------                         1, 000. 00
     Twitch Cove and Big Thoroughfare River, Md_------------__14, 000. 00
     Starlings Creek, Va--- -------                 -----------------------            18, 000. 00
     Ocean City "Inlet and Sinepuxent Bay, Md ----------------                        91, 000. 00
     Examinations, surveys, and contingencies (general), Balti-
       more district----------------- -------------------------                       40, 000. 00
     Washington Harbor, D. C--------------------------------                        199, 000.00
     Potomac River, north side of Washington Channel, D. C ___                         15, 000. 00
     Potomac River below Washington, D. C---------------------                          2, 500. 00
     Totuskey Creek, Va----                         ------
                                              ___-----------                          30, 000. 00
     Mill Creek, Va-------------- ----------                      ---------             7, 500. 00
     Jackson Creek, Va----------------------------------------                          8, 800. 00
     Horn Harbor, Va-----                                                               4, 000. 00
                                                                                       1-------------------------------
     York River to Back Creek, Va., connecting channel ---. ____                      17, 000. 00
     Examinations, surveys, and contingencies (general), Wash-
       ington district ___.           _________        ______-      _                  28, 200. 00
     James River, Va-----------------------------------------460,                          000. 00
     Pagan River, Va------------------------------------------                         30, 000. 00
     Channel from Phoebus, Va., to Hampton Roads____________                           11, 500. 00
     Waterway from Norfolk, Va., to Sounds of North Carolina_                           8, 500. 00
     Inland waterway, Norfolk, Va., to Beaufort Inlet, N. C------                   218, 000. 00
     Examinations, surveys, and contingencies (general), Norfolk -
        district------------------------------------------------                      22, 000. 00
    Plant, Norfolk district.-----............                                         53, 629. 57
     Cape Fear River, N. C., above Wilmington ______--__                          -    59, 000. 00
     Northeast (Cape Fear) River, N. C------------------------                          1, 171.01
     Smiths Creek, Wilmington, N. C----------------------                       _      10, 000. 00
     Far Creek, N. C-------------------------------------                              13, 500. 00
     Examinations, surveys, and contingencies (general), Wil-
        mington, N. C., district---------------------------------                   -23, 000. 00
     Plant, Wilmington, N. C., district----------------------------                   87, 699.38
     Winyah Bay, S. C----------------------------------------                         50, 000. 00
     Waccamaw River, N. C. and S. C--------------------------                           5, 000. 00
     Congaree River, S. C __--_________-___---________--___
                                    --                                                  8, 000. 00
     Shipyard River, S. C------------------- ------------------                        11, 000. 00
     Waterway from Charleston to Beaufort, S. C ---------------                        15, 000. 00
     Savannah Harbor, Ga--------------------------------------100, 000. 00
     Savannah River below Augusta, Ga _______________________                          75, 000. 00
     Waterway from Beaufort, S. C., to St. Johns River, Fla.
        (Beaufort-Cumberland Sound section)               -------------------          55,000.00
     Satilla River, Ga----------------------                                            1, 000. 00
     Fernandina Harbor, Fla                                                            20, 000.00
     Plant, Savannah district--__                                                    739, 877. 32
     Orange River, Fla---------------------------------------                              800. 00
     St. Johns River, Fla., Jacksonville to the ocean .....--... _                  482, 483. 25
     Waterway from Jacksonville to Miami, Fla_______________                          23, 000. 00
     Fort Pierce Harbor, Fla ______ ___________ _________                           131, 000. 00
     Lake Worth Inlet, Fla--- ---------------------------------                        69, 500. 00
     Hollywood Harbor (Port Everglades), Fla-....                                   260, 000. 00
     Caloosahatchee River and Lake Okeechobee drainage areas,
       Florida----------------------------------                      ---              75, 000.000
     Caseys Pass (Venice Inlet), Fla --------------------------                     157, 000. 00
     Tampa Harbor, Fla------------------------------------                             19, 744. 06
    Anclote River, Fla-----------------------------                       --            9, 500. 00
     Homosassa River, Fla_----------------------------------                            3, 998. 64
     Removal of water hyacinth, State of Florida---_                        ---         3, 500. 00
     Examinations, surveys, and contingencies (general), Jack-
       sonville district ---------------                        ---   ------          54, 000. 00
24         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Allotted to-Continued.
     Waterway from Pensacola Bay, Fla., to Mobile Bay, Ala___                       $29, 942. 28
    Waterway from Mobile Bay, Ala., to New Orleans, La_____                              902.28
     St. Andrews Bay, Fla ..........                                                159, 709. 08
    Wolf and Jordan Rivers, Miss           -                                         10, 000. 00
    Chickasaw Creek, Ala                                                              1, 500.00
    Alabama River, Ala_                                                               4, 982. 09
    Black Warrior, Warrior, and Tombigbee Rivers, Ala _____                      1, 242, 100. 00
     East Pass Channel from Gulf of Mexico to Choctawhatchee
       Bay, Fla_--__                                                                  3, 000. 00
    Examinations, surveys, and contingencies (general), Mobile
        district--------------------- ----------------------                       177, 715. 25
     Southwest Pass and and South Pass, Mississippi River, La_                     152, 900. 00
     Mississippi River between Baton Rouge and New Orleans,
       La ----------------------------------------------                            25, 000.00
    Examinations, surveys, and contingencies (general), first
       New Orleans district-               --                                        30, 907. 13
    Plant, first New Orleans district_                                              102, 894.00
     Sabine-Neches Waterway, Tex_                                                1, 070, 802. 01
    Louisiana-Texas Waterway (Sabine River-Corpus Christi
        section) ---------------------------------                                   6, 500. 00
    Galveston Harbor, Tex-                                _   ________-__           81, 545. 53
     Galveston Channel, Tex                                                         60, 000. 00
     Channel from Galveston Harbor to Texas City, Tex______                         73, 073. 91
    Channel to Port Bolivar, Tex_____                                                4,000. 00
     Houston Ship Channel, Tex----------------                                     350, 000. 00
    Channel from Aransas Pass to Corpus Christi, Tex ......                        120, 523. 69
    Port Aransas, Tex,                 ..-                                          13, 000. 00
     Examinations, surveys, and contingencies (general), Galves-
       ton district -_                                                              23, 550. 86
     Yazoo River, Miss_                                                              7, 500. 00
     Examinations, surveys, and contingencies (general), Vicks-
       burg district-                                                               15, 000. 00
     Plant, Vicksburg district___________________________                           59, 000. CO
     Arkansas River, Ark., and Okla_                                                40, 100. 00
     Examinations, surveys, and contingencies (general), Mem-
       phis district-_______________            ____                                62, 500.00
    Removing snags and wrecks from Mississippi River below
       mouth of Missouri River and from Old and Atchafalaya
       Rivers--------------------------------------------                            7, 000. 00
    Illinois and Mississippi Canal, Ill                                               9, 000. 00
     Mill Creek and South Slough at Milan, Ill                                           932. 11
    Reservoirs at headwaters of Mississippi River_                                   3, 500. 00
    :Examinations, surveys, and contingencies (general), St.
       Paul district                                                                13,000.00
     Plant, St. Paul district_________ _                                           884, 000. 00
    TWaukegan Harbor, Ill            _                                               1,000. 00
     Indiana Harbor, Ind__________            __            ____          ____      10, 000. 00
    Examinations, surveys, and contingencies (general), Chicago
       district-                                                                     20, 000. 00
    ;Missouri River, Kansas City to the mouth__                                     548, 000. 00
     Missouri River, Kansas City to Sioux City_                                  1, 225, 872. 68
     Cumberland River, Tenn. and Ky____                                             160,000. 00
     Tennessee River, Tenn., Ala., and Ky                                           102, 500. 00
     Examinations, surveys, and contingencies (general):
          Kansas City district______                                                64,   200. 00
          Omaha district_---------             ______-----___                      105,   000. 00
          Nashville district ---------------------------------
                                                           __                       48,   803. 22
     Plant, Omaha district___________---_---__                 -----------          17,   958. 60
     Plant, Nashville district------------------------                              35,   706. 94
     Ohio River, construction of locks and dams--------------                       13,   700. 00
     Ohio River, open-channel improvement _             _---------------           364,   800. 00
     Monongahela River, Pa. and W. Va_____--                __----------- _        103,   000. 00
     Allegheny River, Pa., construction of locks and dams __--                     108,   500. 00
     Tygart River Damn, W. Va-------------                                 ---     525,   000. 00
     Examinations, surveys, and contingencies (general), Pitts-
        burgh district-----------------------------------                            22. 000.00
                            RIVERS AND HARBORS                                   25
Allotted to--Continued.
     Kanawha River, W. Va ...                -. _______                $728, 000. 00
     Big Sandy River, W. Va. and Ky. including Levisa and Tug
       Forks_--_--                 -       -       --  _-_                22, 200.00
     Kentucky River, Ky-----                                             44, 400.00
     Green, Barren, and Nolin Rivers, and Bear Creek, Ky .___              2; 500. 00
    'Rough River, Ky                                                          650. 00
     Tradewater River, Ky------------------                                5, 000. 00
     Examinations, surveys, and contingencies (general) :
          Huntington district___                                         30,000.00
          Cincinnati district ...                                        64, 000.00
          Louisville district -..                            .           77, 000. 00
     Plant, Huntington district                                         191, 800. 00
     Plant, Cincinnati district                                          50,000. 00
     Plant, Louisville district             __----                      181, 301. 30
     Grand Marais Harbor, Minn_                                          13, 000. 00
     Presque Isle Harbor, Mich                                          152, 000. 00
     Manistique Harbor, .Mich-------- ------            -  -              3, 000. 00
     Green Bay Harbor, Wis_                                              30, 500. 00
     Sturgeon Bay and Lake Michigan Ship Canal, Wis __                    9, 000. 00
     Fox River, Wis._------
                        _--___                                           27, 000. 00
     Two Rivers Harbor, Wis___                                           31, 000.00
     Manitowoc Harbor, Wis---------                                      75, 000. 00
     Racine Harbor, Wis -..------..                                          500. 00
     Holland Harbor, Mich _____---                                        6, 100. 00
     Manistee Harbor, Mich__ __            ___                            2, 500. 00
     Examinations, surveys, and contingencies (general), Mil-
       waukee district-       _ _ _---                                   17, 000. 00
     Alpena Harbor, Mich .... ______--                                   12, 879. 37
     St. Marys River, Mich_                                              81, 500. 00
     Detroit River, Mich _----                                           15, 000. 00
     Saginaw River, Mich                                                 10, 500. 00
     Huron Harbor, Ohio__________________________                        46,000. 00
     Cleveland Harbor, Ohio__           ______        ____     ____     125, 500, 00
     Ashtabula Harbor, Ohio_                                              9, 000. 00
     Conneaut Harbor, Ohio -__                                            2,000. 00
     Black Rock Channel and Tonawanda Harbor, N. Y____ __                19, 000. 00
     Niagara River, N. Y_________                                         1,000. 00
     RIochester (Charlotte) Harbor, N. Y_                                 8, 000. 00
     Little Sodus Bay Harbor, N. Y_                                          500. 00
     Oswego Harbor, N. Y             __________                          48, 500. 00
     Ogdensburg Harbor, N. Y_________                                     2,000.00
     Examinations, surveys, and contingencies (general) :
          Buffalo district _--_--       __                               35, 000. 00
          Los Angeles district----------                                 50, 000. 00
     San Francisco, Harbor, Calif_                                       15, 000. 00
    -Oakland Harbor,    Calif             ___                            25, 720. 87
    Richmond Harbor, Calif__                                             10, 101.28
     Napa River, Calif---                                                75, 000. 00
    Noyo River, Calif __         ------        _.                         4, 898. 72
     Examinations, surveys, and contingencies (general), San
       Francisco . district-,______                                      17, 500. 00
     San Joaquin River, Calif__                                          31, 000. 00
     Mokelumne River, Calif                                               3, 300. 00
     Sacramento River and tributaries, Calif_                           100, 000.00
     Examinations, surveys, and contingencies (general), Sacra-
       mento district-                                                    20, 000. 00
     Plant, Sacramento district___                                        41, 498. 17
    "Coos Bay, Oreg-------       --                                       10,000.00
     Umpqua River, Oreg-                                                 300, 000. 00
     Skipanon Channel, Oreg--------                                        5, 000. 00
    Willamette River at Willamette Falls, Oreg_____                        3, 000.00
     Columbia River at Bonneville, Oreg_                              1, 294,175. 99
     Columbia River and tributaries above Celilo Falls to mouth
       of Snake River, Oreg. and Wash____________                        88, 000. 00
26           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Allotted to-Continued.
    Examinations, surveys, and contingencies (general):
          First Portland district           -                          $4g      46. 49
          Second Portland district-----------------------------          30o,000.00
    Willapa River and Harbor, Wash.-------------                        115, 000. 00-_------
    Puget Sound and tributaries, Washington----                               000.00
                                                                         1__--------
                                                                        10,
    Tacoma Harbor, Wash------.------------------.                        18,000. 00
     Swinomish Slough, Wash---------------------------------             16, 500. 00
     Stikine River, Alaska------------------------------------                 600. 00
     Sitka Harbor, Alaska------------------------------------            65, 000. 00
     Nome Harbor, Alaska--------------------------------------             5, 000. 00
     Examinations, surveys, and contingencies (general), Seattle
       district-------------- ---           --------------------------     5, 000. 00
     Plant, Seattle district------------------------------------        151, 276. 31
     Examinations, surveys, and contingencies (general), Puerto
       Rico district --------------------------------------------          8, 373. 05
     Plant, Puerto Rico district-___- ----               -__---3,             000. 00
     California Debris Commission (regulation of hydraulic min-
       ing, etc.)   -----------------------------------------              6, 000. 00
     Supervision of New York Harbor-------------------------              22, 800. 00
     Surveys (H. Doc. No. 308, 69th Cong., 1st sess.)                    72, 685. 88
                                                                        7----------
     Permanent International Association of the Congresses of
       Navigation___,---- -----------------------------------------        3, 000. 00
     Beach Erosion Board.-------------------------------------            25, 000. 00
     Removing sunken vessels                                             39, 323. 31
                                                                        1-------------------------------

           Total-------------------------------------------22,                                                623, 985. 33
     Balance unallotted--------------------------------     -----                                          4, 264, 180. 11

              Total --------------------------------------------                                         26, 888, 165.44

                 THE BOARD OF ENGINEERS FOR RIVERS AND HARBORS


  The creation of the Board and the duties assigned to it under the
original and subsequent acts of Congress are described in the annual
report of 1922.
   The work accomplished by the Board during the year and the
status of its operations from its organization up to the close of the
fiscal year are shown by the following table:

                                                                                      Total        Number
                                                                      Number         number       completed      Number
             Authority for investigations                             of investi-   completed        during      remaining
                                                                       gations      at close of   year end-      to be com-
                                                                       ordered      preceding        ing June      pleted
                                                                                    fiscal year       30, 1937


River and harbor and flood control acts_----------------                   3, 805        3, 349            101              355
Concurrent resolutions of Congress__. ------------                              1             1 -1
Senate resolutions   .------
                          -----------------                      --             1             1
Resolutions of congressional committees__
                                        ---------------                    1, 046           768            106              172
     Total   --------------------------------------...........             4, 853        4,119             207              527



Number of hearings given at the office of the Board during the
  year       ----------------------------------------------------                92
Net amount expended by the Board during the year .......              $340, 580.42
Estimated cost of projects recommended by the Board from
  its organization to June 30, 1937__--____    _____________   1, 133, 104, 934. 00
Estimated cost of projects so recommended adopted by
  Congress--- -------------------- ----------------------- 1, 048, 892, 858. 00
  Further progress has been made in the preparation and revision of
the series of reports on the principal ports of the United States de-
          THE BOARD OF ENGINEERS FOR RIVERS AND HARBORS                   27

signed to further the interests of importers, exporters, ship opera-
tors, and others concerned in the movement of goods through our
ports. During the fiscal year ending June 30, 1937, revisions of the
following reports were prepared for publication: Portland, Maine
 (no. 1); Mobile, Ala., and Pensacola, Fla. (no. 3, in two parts) ; and
Southern New England (no. 18).
   The following reports were distributed: Boston, Mass. (no. 2);
Jacksonville, Miami, and Tampa, Fla. (no. 8, in two parts); Los
Angeles, Long Beach, San Diego, and San Luis Obispo, Calif. (no.
13, in two parts) ; Ports on the Upper Hudson River, N. Y. (no. 25) ;
and Sacramento, and Stockton, Calif. (no. 26).
   The olkwing is a list of the Port Series Reports and revisions
with year of issue:
  No. 1. The Port of Portland, Maine, 1921, *1927.
  No. 2. The Port of Boston, Mass, 1922, *1929, *1937.
  No. 3. The Ports of Mobile, Ala., and Pensacola, Fla., 1922. Part 1-The
Port of Mobile, Ala., *1929. Part 2-The Port of Pensacola, Fla., *1929.
  No. 4. The Ports of Philadelphia and Chester, Pa., Camden, N. J., and Wil-
mington, Del., 1922. Part 1-The Ports of Philadelphia, Pa., Camden and
Gloucester, N. J., and Ports on the Delaware River above Philadelphia, "1932.
Part 2-The Port of Wilmington, Del., and Ports on the Delaware River below
Philadelphia, *1931.
  No. 5. The Port of New Orleans, La., 1924, *1932.
  No. 6. The Ports of Galveston, Houston and Texas City, Tex., 1924. Part 1-
The Port of Galveston, Tex., *1929, *1935. Part 2-The Port of Houston, Tex.,
*1929, *1935. Part 3-The Ports of Texas City and Corpus Christi, Tex.,
*1929, *1935.
  No. 7. The Ports of Seattle, Tacoma, Everett, Bellingham, and Grays Har-
bor, Wash., 1925. Part 1-The Port of Seattle, Wash., *1931. Part 2-The
Port of Tacoma, Wash., *1931. Part 3-The Ports of Everett, Bellingham, and
Grays Harbor, Wash., *1931.
  No. 8. The Ports of Jacksonville, Fernandina, Miami, Key West, Tampa,
and South Boca Grande, Fla., 1925. Part 1-The Port of Jacksonville, Fla.,
*1930, *1937. Part 2-The Ports of Miami and Tampa, Fla., *1931, *1937.
  No. 9-The Ports of Charleston, S. C., and Wilmington, N. C., 1925, *1934.
  No. 10. The Ports of Savannah and Brunswick, Ga., 1925, *1935.
  No. 11. The Ports of Portland and Astoria, Oreg., and Vancouver, Wash.,
1925. Part 1-The Port of Portland, Oreg., *1931. Part 2-The Ports of
Astoria, Oreg., and Vancouver and Longview, Wash., *1931.
  No. 12. The Ports of San Francisco, Oakland, Berkeley, Richmond, Monterey,
Santa Cruz, and Upper San Francisco Bay, Calif., 1927, *1933.
  No. 13. The Ports of Los Angeles, San Diego, and San Luis Obispo, Calif.,
1924. Part 1-the Ports of Los Angeles and Long Beach, Calif., *1931, *1936.
Part 2-The Ports of San Diego and San Luis Obispo, Calif., *1931, *1936.
   No. 14. The Ports of Port Arthur, Sabine, Beaumont, and Orange, Tex., 1925,
*1933.
  No. 15. The Ports of Norfolk, Portsmouth, Newport News, and Hampton, Va.,
1927, *1934.
  No. 16. The Ports of Baltimore, Md., Washington,'D. C., and Alexandria, Va.,
1926. Part 1-The Port of Baltimore, Md., *1933.
  No. 17. The Ports of the Territory of Hawaii, 1926, *1935.
   No. 18. The Ports of Southern New England, 1928.
   No. 19. The Ports of Gulfport and Pascagoula, Miss., 1925, *1934.
   No. 20. The Port of New York (in three parts), 1926, *1932.
  No. 21. The Ports of Puerto Rico, 1927, *1935.
   No. 22. The Panama Canal and its Ports, 1928, *1932.
   No. 23. The Ports of Olympia and Port Angeles, Wash., 1932.
   No. 24. The Ports of Northern New England, 1934.
   No. 25. The Ports on the Upper HIudson River, 1936.
  No. 26. The Ports of Sacramento and Stockton, Calif., 1937.
  *   .Revision.
28           REPORT OF CHIEF OF ENGINEERS, U. S. A'RMY, :1937

  A Lake: Series of reports, similar in-form' and scope toothePort
Series, has been published and the following numbersclhave ,been
ssued, though no ew;one s were distributed' during the year: .   ,
  :Noi:1.    The Port of Buffalo, N. Y., 1931.
  No. 2,     The Port of Detroit, Mich., 1931.                           i
  No. 3.     The Port of Milwaukee, Wis., 1931.
  No. 4.     The Port of Chicago, Ill., 1931.
  No. 5.     The: Port of Cleveland, Ohio, 1931.
  No. :.     The Port of Dultith=Superior, Minn. and Wis., 1931,
  No. 7.     The Port of Toledo, Ohio, 1931.                                       /

  No. 8.     The Ports of Sandusky, Huron, and Lorain, Ohio, 1932.
   A Transportation Series of reports has also been published in
which are included reports on investigations of transportation condi-
tions, showing the movements of traffic by water, and treating of the
physical and economic conditions having a bearing upon the utiliza-
tion of water routes. Report No. 1, on Transportation on the Great
Lakes, is being revised for issue next year. The following numbers:
have been issued:
  No.   1.   Transportation    on the Great Lakes, 1926, *1930.
  No.   2.   Transportation    in the Mississippi and Ohio Valleys,, 1929.
  No.   3.   Transportation,   Lines Operating on the Great Lakes, 1935.
  No.   4.   Transportation    Lines Operating on the Mississippi River System, 1936.
  Reports not within the scope of the Port Series, Lake Series, or
Transjportation Series are published as the Miscellaneous Series. The
following have been issued in this series:
   No. 1. Port and Terminal Charges at United States Ports, 1929, *1931, *1934,
*1936, *1937, and supplements in 1932, 1933, and 1935.
   No. 2. Shipping Charges at United States and Foreign Ports: Consular Serv-
ices and Charges, 1928.
   No. 3. Foreign Trade Zones or Free Ports, 1929, 1934 (reprint).
   It is planned to revise Report No. 1 annually in order to have avail-
able current information.
   Miscellaneous studies were made in connection with subjects pend-
ing before the: Board and in response to specific calls; and tables,
graphs, and maps have been prepared as necessary in connection
therewith.
   On June 30, 1937, the Board was composed of the folloting mem-
bers: Brig. Gen. George B. Pillsbury, Brig. Gen. Max C, Tyler, Col.
Elliott J. Dent, Col. Laurence V. Frazier, Col. Edmund L. Daley,.
Lt. Col. Raymond A. Wheeler, and Maj. William A. Snow. In addi-
tion to the foregoing the following-named officers have also' been de-
tailed for various periods during the year to membership .on the
Board: Col. Earl I. Brown, Col. Ernest D. Peek, Col. T ildurr Wil-
ling, Col. Warren T. Hannum, Col. Roger G. Powell,'Col. Joh N.
Hodges, Col. Glen E. Edgerton, Lt. Col. Frank S. Besson, Lt. Col.
Francis K. Newcomer, Lt. Col. William H. Holcombe, Lt. Col, John
H. Carruth, Maj. Thomas D. Stamps, and Capt. Thomas IH., Stanley.

  IMPROVEMENT OF RIVERS AND HARBORS IN .THE
           BOSTON, MASS.,. DISTRICT ..
  Prior to November 1, 1936, the Atlantic drainage area and tidal
waters in eastern Maine:from the: Point of Main to the interriational
boundary at the head of Boundary Creek, including Cobscook-Bay,
  * Revision.
          RIVERS AND HARBORS-BOSTON, MASS, DISTRICT                          29
the St. Croix and: Machias Rivers, and their tributaries, were under
the former Eastport, Maine, District. Since that date, this district
includes the State of Maine; the State of New Hampshire east of the
Connecticut River Basin; and eastern Massachusetts from the New
Hampshire State line to the southern end of Nauset Beach at Chat-
ham Bar, on the east coast line of Cape Cod; and the Cape Cod
Canal.
   District engineer: (Former Eastport, Maine, District.) To August
15, 1936, Lt. Col. Philip B, Fleming, Corps of Engineers; to October
31, 1936, Capt. Samuel D. Sturgis, Jr., Corps of Engineers (acting
district engineer).   (Boston, Mass., District.) Lt. Col. Albert K. B.
Lyman, Corps of Engineers.
   Division engineer: Col. E. D. Peek, Corps of Engineers.
                                   IMPROVEMENTS

                                    Page                                     Page
1. Passamaquoddy tidal power            14. Scituate Harbor, Mass.-----      58
      project -------------------     29 15. Cape Cod Canal, Mass-------      59
2. Corea Harbor, Maine .-------      30 16. Examinations, surveys,, and
3. Penobscot River, Maine            31       contingencies (general)__      68
4. New Harbor, Maine_ .....          33 17. Other projects for which no
5. Kennebec River, Maine ---         34       estimates are submitted__      70
6. Saco River, Maine_                35 18. Plant allotment-----------       70
7. Kennebunk River, Maine ...        38 19. Nashua River, 'Fitchburg,
8. Newburyport Harbor, Mass_         39       Mass., flood protection ...    7
9. Gloucester Harbor and An-            20. Merrimack River, Haverhill,
      nisquam River, Mass _.__        41       Mass., flood protection- ..    72
10. Mystic River, Mass_______ _       44 21. Merrimack     River, Lowell,
11. Boston Harbor, Mass_-------       48       Mass., flood protection __     74
12. Weymouth Fore River, Mass_        54 22. Merrimack River, N. H. and
13. Town River, Mass -----------      56       Mass., flood control ------    76
             1. PASSAMAQUODDY TIDAL POWER PROJECT

   The Engineer Department was charged with the construction of
the Passamaquoddy tidal power project as a part of the Emergency
Relief Program, and a district office was established at Eastport,
Maine. This project is located at Passamaquoddy and Cobseook
Bays, arms of the Bay of Fundy, at the mouth of the St. Croix River,
a boundary stream between Maine and New Brunswick. The project
is for the creation and maintenance of a separate high-level pool about
37 square miles in area in Cobscook Bay by the construction of a
series of dams, a powerhouse, a filling gate structure, and a naviga-
tion lock, and for the generation of power by utilizing the difference
in head between this pool and the Bay of Fundy. An initial allot-
ment of $10,000,000 was received on May 28, 1935. This amounit was
subsequently reduced to $7,000,000. As additional funds for the con-
tinuation of operation were not appropriated by Congress, operations
were suspended hortly after the close of the fiscal year 1936. On
November 1; 1936, the activities of the former Eastport district were
transferred to the Boston, Mass., district. Demobilization of plapt
and personnel was completed by June:30,1937. 'The facilities of the
project were 'transferred to the Works Progress 'Administration.
   SOperistions and results during fiscal year. Operations during the
fiscal' year consisted' bof acquisition of land, field examinatiohs, and
engineering studies,' engineering design, preparatioin of pIans and
specifications; eompldtion of Pleasant' Point Dai 'an'd arl'6w tsland
30           REPORT O F CHIEF OF ENGINEERS, U. S. ARMY, 1937

Dam; partial completion of Treat-Dudley Dam and filling gate struc-
:tures, and preliminary work in connection with the power station
and allied features. The costs were $513,939.15 for new work. The
expenditures were $334,866.91.
                                            Cost and financial summary
Cost of new work to June 30, 1937---------------------------                                         $2, 651, 110. 91
Cost of maintenance to June 30, 1937-------   ----                                                         -------
      Total cost of permanent work to June 30, 1937                           -----------                2,651, 110.91
Undistributed costs June 30, 1937--------------------------3,                                              653, 787. 43

      Net total cost to June 30, 1937___---- __-----------------__                                       6, 304, 898. 34
Plus accounts receivable June 30, 1937--------------- __-----                                                66, 310. 16
     Gross total costs to June 30, 1937-------------      __-                                            6, 371, 208. 50
Minus accounts payable June 30, 1937-------------------------                                                 7, 423. 53
     Net total expenditures                   _____---------------                         -    6, 363, 784. 97
Unexpended balance June 30, 1937 _-_____                              ____-                        106, 215. 03
                                                                                           -________
         Total amount appropriated to June 30, 1937--_________                                           6, 470, 000. 00

       Fiscal year ending June 30                 1933        1934            1935            1936              1937


Cost of new work__---___________ __-- -_____ __ _     __     ---                      $2,137, 171.76          $513, 939.15
Cost of maintenance----------------------------------------------                      ____


Iotl        de------- -------------------         - -= ----   -----   --   ---------- 6,028, 918.06            334, 86. 91
Allotted----------------------------------------------------                           7,000,000.00          -530,000.00


Balance unexpended July 1, 1936________________________-                                                  $971, 081. 94
Deductions on account of revocation of allotment___-_------_                                               530, 000. 00
      Net amount to be accounted for-------------------------                                              441, 081.94
Gross amount expended---___-           _________--__ $842,972. 09
Less-
    Reimbursements collected---------- $173, 832..33
    Receipts from sales___---------__   ---
                                      ____  334, 272. 85
                                                         508, 105. 18
                                                                                                           334, 866. 91
      Balance unexpended June 30, 1937                                                                     106, 215. 03
Outstanding liabilities June 30, 1937 ------ ________________                                        _      76, 423.99
     Balance available June 30, 1937------------------                                                      29, 791. 04
Accounts receivable June 30, 1937_________________     -______                                              66, 310. 16
        Unobligated balance available June 30, 1937-----96,                                                     101. 20
                                       2. COREA HARBOR, MAINE
   Location.-This harbor, locally known as Indian Harbor, lies at the
southeasterly extremity of the town of Gouldsboro and just westerly
of the entrance to Gouldsboro Bay, about 12 miles east of Bar Harbor,
Maine. (See U. S. Coast and Geodetic Survey Chart No. 305.)
   Existing project.--This provides for an anchorage basin 8 feet deep
at mean low water, 600 feet long in an east and west direction, and
400 feet wide in a north and south direction. The mean tidal range
is 10.5 feet and the extreme 12 feet. The estimate of cost for new work
made in 1935 is $44,300. Maintenance costs will be nominal.
           RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                    31
  The existing project was authorized by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 27, 74th
Cong., 1st sess.). The latest published map is in the project document.
  Terminal facilities.-There are 12 small wharves, none of which
can be approached by vessels at low tide. The wharves are privately
owned. Facilities are considered adequate for present commerce.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done on the
existing project.
  Proposed operations.-The sum of $44,300 allotted during July
will be applied during the fiscal year to new work in dredging the
anchorage basin by contract.
                            Cost and financial summary
Net total expenditures
Total amount appropriated to June 30, 1937-------
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937----------------------------------------$44, 300
Amount available for fiscal year 1938------------------------------- 44, 300
                         3. PENOBSCOT RIVER, MAINE

   Location.-This river drains a large number of lakes and small
streams in north central and eastern Maine, and after assuming
definite character as a stream flows about 100 miles in a southerly
direction through the middle of the State, discharging into Penobscot
Bay, about 90 miles northeast of Portland, Maine. (See U. S. Coast
and Geodetic Survey Chart No. 311.)
   Previous projects.-Adopted by the River and Harbor Act of
July 11, 1870, and modified by the River and Harbor Acts of July
5, 1884, August 11, 1888, July 13, 1892, and March 3, 1899. The
amount expended prior to the adoption of the existing project in
1907 was $367,800, for new work. For further details of previous
projects, see page 1732 of Annual Report for 1915.
   Existing project.-This provides for dredging to a depth of 22
feet between Winterport and Bucksport, about 16 miles below
Bangor; for straightening, widening, and deepening to 15 feet the
channel near Sterns Mill and near Crosbys Narrows from 3 to 4.5
miles below Bangor; for deepening the basin of the Kenduskeag
stream at its junction with the Penobscot to 5 feet; and for deepen-
ing the harbor at Bangor to 14 feet and widening it along the
Bangor front, giving an additional width of from 100 to 300 feet for
a length of about 2,000 feet. The project depths refer to mean low
water, which is 3 feet above extreme low tide. The mean range of
tide at Bangor is 13.1 feet, and the extreme about 15 feet.
   The estimate of cost for new work, made in 1906, was $130,000,
exclusive of amounts expended under previous projects. The latest
(1906) approved estimate for annual cost of maintenance is $500.
   The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for widening the
channel at Bangor and at Crosbys Narrows (S. Ex. Doc. No. 44, 48th
Cong., 1st sess.); act of August 11, 1888, provided for the dredging
between Winterport and Bucksport (H. Ex. Doc. No. 133, 50th Cong,
1st sess.); act of July 13, 1892, provided for a further widening of
     20196--37--pt. 1------3.
32      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the channel at Bangor (H. Ex. Doc. No. 37, 52d Cong., 1st sess.);
act of March 3, 1899, provided for dredging the Kenduskeag stream
 (H. Doc. No. 49, 55th Cong. 1st sess.); act of March 2, 1907, provided
for the further widening of the harbor of Bangor (H. Doc. No.
739, 59th Cong., 1st sess.). The latest published map is in the last-
mentioned document. Other maps are in House Document No. 652,
Seventy-first Congress, third session.
    Terminal facilities.--The river front of Bangor Harbor has 18
wharves. They are of the timber-crib stone-ballasted type. In Ken-
duskeag stream there are 42 berths for small vessels. In general
the wharves are not modern and are in only fair condition. Eleven
wharves have physical connection with railroad. There is a ferry
location publicly owned. On the east side of the river at Brewer,
opposite Bangor, there is one water terminal, a coal-handling plant,
having mechanical appliances and adequate facilities. The re-
mainder of the terminals at this locality are without such facilities
and in poor condition. At South Brewer there is a large pulp and
paper plant which has water connections and all necessary facilities
pertaining to its business. A number of the private wharves are
open to the public at moderate charges. The terminal facilities are
considered adequate for existing needs.
     On the north side of the river at Bucksport there are four impor-
tant terminals, one a coal-handling plant, two used by a large paper-
manufacturing plant, and one used by a passenger and freight
steamboat line, until the discontinuance of the line in the fall of 1935.
     Operations and results during fiscal year.--None.
     Condition at end of fiscal year.-The existing project was com-
pleted in 1913. A survey made in 1934 over reported shoal areas
showed a depth of 16.4 feet for a width of 145 feet at Lawrence Cove,
a depth of 22 feet for a width of 180 feet at Frankfort Flats, a depth
of 15 feet for a width of 300 feet from Crosbys Narrows to Sterns
Mill, a depth of 14.1 feet for a width of 250 feet off Ayers Mill, and
a depth of 14 feet for a width of 300 feet in front of Highhead
Wharf at Bangor. The cost and expenditures have been $138,500, of
which $133,220.53 was for new work and $5,279.47 for maintenance.
     Proposed operations.--With funds allotted from the War Depart-
ment Appropriation Act of July 19, 1937 ($50,000) the U. S. hopper
dredge Minquas will be operated in maintenance dredging between
Bucksport and Bangor; estimated 180,000 cubic yards (April-June
  1938). With the completion of the maintenance dredging during the
  fiscal year 1938, the improvement of Penobscot River will be in a
  condition to meet the reasonable requirements of present and pros-
  pective commerce. Accordingly, no funds can be profitably expended
  during the fiscal year 1939.
                          Cost and financial summary

Cost of new work to June 30, 1937 - ____    __-___-----$501,                020. 53
Cost of maintenance to June 30, 1937-----__-------------                 5, 279. 47
      Total cost of permanent work to June 30, 1937-------------       506, 300. 00
Net total expenditures------------------------              --------   506, 300. 00
Total amount appropriated to June 30, 1937 ----------------            506, 300. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937                    .             _-50,
                                                 _._.._--.....              000. 00
Amount available for fiscal year 1938 --------- --- --------            50, 000. 00
               RIVERS AND HARBORS-BOSTON, MASS., DISTRICT

                                    4. NEW HARBOR, MAINE
   Location.-This is a small harbor on the easterly side of Pemaquid
Neck and about 15 miles southwest of Rockland Harbor, Maine. (See
U. S. Coast and Geodetic Survey Chart No. 313.)
   Existing project.-This provides for dredging to a depth of 12 feet
at mean low water over an area of about 41/2 acres in the lower part
of the harbor and to 6 feet at mean low water over an area of about
41/4 acres in the upper part. The mean range of tide is 8.9 feet and
the extreme range 10.1 feet. The estimate of cost for new work made
in 1903 was $10,500.
   The existing project was authorized by the River and Harbor Act
of March 3, 1905 (H. Doc. No. 167, 58th Cong., 2d sess.).
   Terminal facilities.-There are about 19 small-boat landings in.
New Harbor, 12 on the north side of the harbor, 2 of which are of
stone construction, and 7 on the south side, 1 of which is of stone-
construction. The other wharves are of wooden pile and timber con-
struction. The wharves are privately owned. The facilities are con-
sidered adequate for present commerce.
   Operations and results during fiscal year.-Dredging of the an-
chorage area in the upper part of the harbor to a depth of 7 feet at
mean low water was commenced October 14, 1936, under contract
and completed December 10, 1936, 11,252 cubic yards of material
being removed at a cost of $12,566.27 for maintenance, the expendi-
tures being the same.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1905. The anchorage area in the upper part of the inner
harbor has a depth of 7 feet at mean low water. In the lower harbor
the depths are 8 to 16 feet. These depths are adequate for naviga-
tion. The costs have been $10,500 for new work and $12,566.27 for
maintenance, a total of $23,066.27, the total expenditure being the
same.
  Proposed operations.-No funds are available and no work is
proposed during the fiscal years 1938 and 1939.
                                    Cost and financial summary
Cost of new work to June 30, 1937--_---      _----------------                                    - $10, 500. 00
Cost of maintenance to June 30, 1937---------------------                         __   -             12, 566. 27
      Total cost of permanent work to June 30, 1937-----------_                                     23, 066. 27
Net total expenditures--------__ ------------------- ------                                         23, 066. 27
Total amount appropriated to June 30, 1987--------------------                                      23, 066. 2T

         Fiscal year ending June 30                  1933         1934   1935              1936          1937

Cost of new work-----..............-------..--------..........
Cost of maintenance-- ------------------- ------------------------------.....     ...........          $12,566.27
Total expended----------------------------   ------------------------    ---                            12, 566.27
Allotted --------------------------------    ----..............                                         12, 566. 27


Amount allotted from War Department Approprihtion Act approved
  May 15, 1936--------------------------------       ---------- $16, 700. 00
Deductions on account of revocation of allotment----------------  4,133. 73.
         Net amount to be accounted for--------------                           ---------- 12, 566. 27
Gross amount expended----- -------------------------------                                          12, 566. 2T
34      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                    5. KENNEBEC RIVER, MAINE

   Location.--Kennebec River drains a large number of lakes and
minor streams, and flows from Moosehead Lake about 150 miles in
a southerly direction and discharges into the Atlantic about 25 miles
east of Portland. (See U. S. Coast and Geodetic Survey Charts Nos.
288, 289, and 314.)
   Previous projects.-The first project was adopted by the River and
Harbor Act of March 2, 1827. Modifications and additions were
authorized by River and Harbor Acts of August 30, 1852, June 23,
1866, July 11, 1870, March 3, 1871, March 3, 1873, March 3, 1881,
August 11, 1888, and June 13, 1902. The cost and expenditures on
projects prior to the existing one, on which work was commenced
in 1906, were $509,411.03, all for new work. For further details of
previous projects see page 1735 of Annual Report for 1915.
   Existing project.-This provides for a channel below Gardiner
not less than 150 feet wide, with a depth of 17 feet at Beef Rock
Shoal, at the foot of Swan Island, 18 feet deep through rock at
Lovejoy Narrows, near the head of Swan Island, decreasing to 16
feet deep at Gardiner; a channel west of Swan Island 100 feet wide,
12 feet deep, except at the upper shoal, where the depth was to be
15 feet; and a channel 125 feet wide and 11 feet deep from Gardiner
upstream to Augusta, at the head of navigation. The section of
river included in the project is about 21.5 miles in length. The
work included dredging, rock excavation, and two riprap training
walls. The project depths refer to mean low water. The mean tidal
range is 8.3 feet at the mouth of the river, 6.5 feet at Bath, 5.5 feet
at the foot of Swan Island, 5 feet at Gardiner, and 4.1 feet at
Augusta. The spring tides are about 1 foot greater at the mouth
and about 0.5 foot greater at Augusta. The estimate of cost for new
work, revised in 1912, was $386,500, exclusive of amounts expended
under previous projects. The latest (1928) approved estimate for
annual cost of maintenance is $2,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the channel
between Augusta and Gardiner (H. Doc. No. 262, 56th Cong., 1st
sess.) ; the act of March 2, 1907, provided for the channel below Gar-
diner (H. Doc. No. 321, 59th Cong., 2d sess.) ; and the act of March 4,
1913, provided for the channel west of Swan Island (H. Doc. No.
746, 62d Cong., 2d sess.). For latest published maps see above docu-
ments and Annual Report for 1915, page 2022.
   Recommended modifications of project.-In House Document
Number 2107, Sixty-fourth Congress, second session, it was recom-
mended that the improvement and maintenance of the channel west
of Swan Island, near the town of Richmond, be abandoned.
   Terminal facilities.-There are a number of wharves which have
been allowed to fall into such a condition of disrepair that their use
is not feasible until they are extensively repaired or rebuilt. Those
capable of serving a useful purpose are for the greater part located at
the principal towns, viz, Bath, Richmond, Randolph, Gardiner, Hal-
lowell, and Augusta.
   At Bath there are 25 wharves. Eight are physically connected with
the railroad. The majority of the wharves have mechanical appli-
ances for handling freight, and 11 are open to the public, one being
                  RIVERS'AND HARBORS-BOSTON, MASS., DISTRICT                                                                             35
publicly owned. Five wharves have depths varying from 12 to 15
feet, 7 have from 16 to 20 feet, and 13 have over 21 feet.
  The wharves at Bath serve the shipyards, coal business, etc.
  At the other above-named points there are 16 wharves in usable
condition. All but one are equipped with mechanism for handling
passengers or freight. Those open to the public on equal terms are
two at Hallowell and one each at Randolph and Augusta. None is
publicly owned.
  The shipyards at Bath have built extensive wharves, but probably
more for the purpose of securing additional room for plant than for
terminal purposes.
   Operations and results during fiscal year.-A lighter, with crew
and attendant plant, under lease removed obstructions in the river be-
tween Swan Island and Augusta in September-October 1936, at a cost
of $5,727.16 for maintenance, the expenditures being the same.
   Condition at end of fiscal year.-The existing project was completed
in 1914 at a saving of $62 under the estimated cost. The controlling
depth on June 30, 1937, at mean low water was 12 feet from Abagad-
aset Point to the Gardiner-Randolph Bridge and 9 feet thence to
Augusta, at the head of navigation. The cost of the existing project
has been $386,438.38 for new work and $31,788.78 for maintenance, a
total of $418,227.16, the expenditures being the same.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938-39.
                                             Cost and financial summary

Cost of new work to June 30, 1937----------------------------                                                            $895, 849. 41
Cost of maintenance to June 30, 1937      ----------------___                                                              31, 788. 78
      Total cost of permanent work to June 30, 1937---- ---------- 927, 638. 19
Net total expenditures_------__-----__-                            927, 638. 19
Total amount appropriated to June 30, 1937----------------------927,    638. 19

          Fiscal year ending June 30                              1933              1934               1935       1936            1937


Cost of new work__
Cost of maintenance.............-------------------.......         -------      --------------------          -----------        $5, 727.16
Total expended.....................--------------- ------------ ------------------------                       -----------        5, 727. 16
Allotted-------------------             -------------------------------------                                 -----------    -   5,727.16



Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936----------------------------------           $7, 500. 00
Deductions on account of revocation of allotment-----------------  1, 772. 84
      Net amount to be accounted for---------------         -                                                                5, 727. 16
Gross amount expended -----------------------------------------                                                              5, 727. 16
                                               6. SACO RIVER, MAINE

   Location.-This river rises in the White Mountain region of New
Hampshire at an elevation about 1,900 feet above sea level, flows
about 105 miles in a general southeasterly direction, and discharges
into the Atlantic Ocean about 16 miles southwest of Portland,
Maine. (See U. S. Coast and Geodetic Survey Chart No. 231.)
36      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Existing project.-This provides for a channel depth of 8 feet at
mean low water in earth cuts and 9 feet deep in ledge from the sea
to the head of navigation at the cities of Saco and Biddeford, a dis-
tance of about 6 miles, the width to be 140 feet across the bar, 200
feet in th elower section between the jetties, 140 feet in the middle
section, a d 100 feet in the upper section, to be secured by means of
dredging; a small quantity of rock excavation, several small riprap
jetties within the river, a riprap breakwater about 6,660 feet long,
extending eaward from the north side of the mouth of the river, and
a _iprap j ty or training wall from the south side of the mouth of
the river, ractically parallel with the breakwater and about 4,800
feet long. The mean tidal range is 8.8 feet; the extreme about 1 foot
greater.
    The estimate of cost for new work, revised in 1935, is $601,000,
including $20,000 contributed by local interests. The latest (1934)
approved estimate for annual cost of maintenance is $3,500.
    The existing project was authorized by the following river and
harbor acts: The act of March 2, 1827, provided for the erection of
piers, the placing of buoys, and the removal of obstructions at the
entrance of the harbor; act of June 23, 1866, provided for the
breakwater on the north side of the mouth of the river; act of Sep-
tember 19, 1890, provided for the jetty on the south side of the mouth
  (S. Ex. Doc. No. 44, 48th Cong., 1st sess.) ; act of June 25, 1910,
provided for a project depth of 7 feet and an extension of the jetty
on the south side of the mouth of the river (H. Doc. No. 752, 61st
Cong., 2d sess.); act of March 3, 1925, provided for the present
dimensions of the channel and the extension of the north breakwater
or jetty about 1,600 feet (H. Doc. No. 477, 68th Cong., 2d sess.) ; and
the act of August 30, 1935, provided for the extension of the north
breakwater or jetty a distance of 860 feet to Sharps Ledge (Rivers
and Harbors Committee Doc. No. 11, 74th Cong., 1st sess.). The
latest published maps are in House Document No. 752, Sixty-first
Congress, second session, and Rivers and Harbors Committee Docu-
ment No. 11, Seventy-fourth Congress, first session.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There is a small pier near the mouth of the
river which is used for summer passenger business. There are five
wharves, all of solid fill construction, at Saco and Biddeford, none
of which has railroad connection. Of these, one is unavailable be-
cause of a rocky berth, one is in poor condition, and three are in
good condition. The latter are used for private business, two are
coal-handling terminals and are open to the public on moderate
terms; the other, no longer in use, was formerly used as an oil ter-
Ininal. One coal wharf has modern mechanical appliances, with
good efficiency; the other is equipped, but the machinery is crude.
Depths range from 6 to 8 feet at mean low tide. The traffic is
small and is almost entirely coal. The facilities appear to be ade-
quate for existing demands.
     Operations and results during fiscal year.-Under contract for
construction of an 860-foot extension to the north jetty at the mouth
  of the river, work was commenced November 11, 1936, and to June
  30, 1937, 1,742 tons of rubblestone had been placed, partially com-
              RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                           37
pleting a length of 150 feet, at a cost of $6,051.38, for new work. The
expenditures were $2,739.52.
   Condition at end of fiscal year.-About 85 percent of the existing
project has been completed. The remaining portion includes com-
pletion of the extension of the north jetty, 860 feet, and the removal
of a small quantity of ledge at Twin Islands. So far as known, there
is no urgent necessity for the removal of this ledge at this time. The
several small riprap jetties within the river were completed in 1893.
The jetties are in generally good condition. The 8-foot channel is
completed with the exception of the removal of the ledge at Twin
Islands. Restoration of the 8-foot channel was completed in Septem-
ber 1935, but it is reported that the channel has shoaled because of
the severe flood in the spring of 1936 so that the controlling depth is
about 5 feet at mean low water. The costs of the existing project
have been $495,404.22 for new work and $73,918.70 for maintenance, a
total of $569,322.92. The expenditures have been $566,011.06. In
addition $20,000 has been expended from contributed funds.
   Proposed operations.-The funds unexpended at the end of the
fiscal year, amounting to $42,843.63, will be applied as follows:
Accounts payable June 30, 1937 -----------------------------               $3, 311.86
New work: Complete by November 1937 an existing contract for
  extension to the north jetty at the mouth of the river, 11,150 tons
  rubblestone--------------------------------------------- 35, 531.47
Unallocated -----------       ----            ----------     ----------- -- 4, 000. 30

         Total---------------------------------------------                                             42, 843. 63
  No additional funds can be profitably expended during the fiscal
year 1939, as it is not believed any work will be necessary during
that year.
                                     Cost and financial summary
Cost of new work to June 30, 1937------------------------1                                         $495, 404. 22
Cost of maintenance to June 30, 1937-------------------------                                        73, 918. 70
Total cost of permanent work to June 30, 1937-------------                                          569,322. 92
Minus accounts payable June 30, 1937 ----------------------                                           3,311.86
     Net total expenditures   ----------------------------    1566, 011. 06
Unexpended balance June 30, 1937 ----------------------------   42, 843. 63
         Total amount appropriated to June 30, 1937 --------------                                  608, 854. 69

         Fiscal year ending June 30                 1933           1934         1935        1936            1937


Cost of new work-------... -------....--- ------------   ----------------------------------                $6, 051.38
Cost of maintenance ..... ..-------------- ------------ ------------ $9, 366.93 $44, 708. 35             ..........
Total expended----------------------------                       ----             99.25   53,960. 75        2, 739.52

Allotted-------------------
                     ......................       -$460.21    ------------    44,000.00   10, 060. 00      45, 583. 15



Amount allotted from War Department Appropriation Act approved
May 15, 1936------------------------------      -------------   $50, 000. 00
Deduction on account of revocation of allotment-----------------   4, 416. 85

         Net amount to be accounted for--------                              -----------                45, 583. 15
  1 In   addition $20,000 contributed funds expended for new work.
38         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended___-------------------------                   $2, 739.82
Less reimbursements collected_------------------ ----                     0. 30
                                                                                  $2,739.52
     Balance unexpended June 30, 1937------------                    ------    42, 843. 63
Amount covered by uncompleted contracts ----- __---                      -__---38,843.33

       Balance available June 30, 1937----------4,                                    000.30

Amount (estimated) required to be appropriated for completion of
                  2- - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -   4 6, 0 00 00
existing project                                                                         .
  2 Exclusive of available funds.

                          7. KENNEBUNK RIVER, MAINE
   Location.-The source of Kennebunk River is in the central part of
York County in southwestern Maine. The stream flows about 15
miles in a southeasterly direction and discharges into the Atlantic
Ocean about 30 miles southwest of Portland, Maine. (See U. S.
Coast and Geodetic Survey Chart No. 1205.)
   Existing project.-This provides for the construction of a stone
breakwater on the easterly side of the mouth of the river about 550
feet long, a pier or jetty on the westerly,side of the mouth about 290
feet long, the construction of a wharf about 700 feet upstream from
the shore end of the breakwater, the construction of a jetty on the
left bank a short distance farther upstream, and securing a depth of
4 feet at mean low tide for an average width of 100 feet up to Ken-
nebunkport, a distance of about 1 mile, by dredging and rock re-
moval. The mean tidal range is 9 feet, the extreme 13.5 feet. Work
appears to have been commenced by the State of Massachusetts in
1798, since which date a number of small appropriations have been
made for maintenance and further improvement. The River and
Harbor Act of March 2, 1829, provided for repair of the pier on the
eastern side of the channel at the entrance.
   The act of August 14, 1876, provided for deepening at Wading
Place and Mitchells Point (Annual Report for 1875, p. 115); the
act of September 19, 1890, for the jetty at Wading Place (H. Ex. Doc.
No. 136, 51st Cong., 1st sess; also Annual Report for 1890, p. 471).
   Terminal facilities.-There are seven privately owned piers in
usable condition at Kennebunkport. The terminal facilities are of
low efficiency, but are regarded as sufficient for existing needs.
   There is one wharf on the east side of the river about one-fourth
mile above the mouth. It is owned by the Federal Government and
is in poor condition.
   Operationsand results during fiscal year.-Two stone beacons on the
jetty on the left bank of the river were repaired in October 1936 by
hired labor at a cost of $494.47 for maintenance, the expenditures being
the same.
   Condition at end of fiscal year.-The existing project was completed
in 1893. Maintenance dredging to 4 feet at mean low water for a
width of 100 feet was completed August 13, 1932. The jetties at the
mouth of the river were repaired in August and September 1935;
the stone beacons on the jetty on the left bank of the river in 1936.
The controlling depth as ascertained in August 1932 was 4 feet at
mean low water. At a point abreast of the mouth of Gooch Creek the
channel has a width of 80 feet, due to a small ledge area on the westerly
                RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                               39

side of the channel, over which there is a depth of 2.3 feet at mean
low water. The costs and expenditures have been $83,584.01 for new
work and $51,324.70 for maintenance, a total of $134,908.71.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939.
                                          Cost and financial summary
Cost of new work to June 30, 1937-------------------------------                                             $83, 584.01
Cost of maintenance to June 30, 1937----------------------------                                              51, 324. 70
      Total cost of permanent work to June 30, 1937--------------- 134, 908. 71
Net total expenditures-------------                             --- 134, 908. 71
Total amount appropriated to June 30, 1937---------------------- 134,908. 71

         Fiscal year ending June 30                       1933         1934              1935         1936        1937

Cost of new work .-----------                -        -------------            ------------     --$                   .-----
Cost of maintenance _                            --     $2, 954. 46 ---------------------        $2, 800. 00       $494. 47
Total expended ------------------------                  9, 766. 10                - ----2,800.00
                                                                              .------.                              494.47
Allotted-------------------------------814.06----------------------                                2, 800. 00       494.47


Amount allotted from War Department Appropriation Act approved
May 15, 1936------        -----------------------------------                                                  $750. 0
     Deductions on account of revocation of allotments_-----------                                               255. 53

          Net amount to be accounted for----------------------------                                             494. 47
          Gross amount expended--------------------------- $494. 67
          Less reimbursements collected----------------------    . 20
                                                                                                                 494. 47

                                8. NEWBURYPORT HARBOR, MASS.

   Location.-Newburyport is on the south bank of Merrimack River,
about 2.5 miles above the mouth and about 48 miles by water north
of Boston. (See U. S. Coast and Geodetic Survey Chart No. 331.)
   Existing project.-This provides for two rubblestone jetties, each
15 feet wide on top at elevation 12 feet above mean low water, with
slopes of 1 on 2 on the seaward face and 1 on 1 on the shoreward
face; one projecting from the north shore, 4,118 feet, the other from
the south shore, 2,445 feet, converging until 1,000 feet apart, and then
extending seaward parallel to the axis of the channel for a distance
of 1,000 feet; and for partially closing Plum Island Basin by a timber
dike about 800 feet long and 5.5 feet above mean low water; the object
being to create at the outer bar a permanent channel 1,000 feet wide
and at least 17 feet deep at mean low water, to enable vessels of such
draft as. can proceed at high tide to the wharves at Newburyport to
enter the river at mean low water. The mean range of tide is 7.9 feet
at the bar and 7.8 feet at Newburyport. The extreme range is about
9.1 feet at the bar and 8.8 feet at Newburyport.
   The estimate of cost for new work, revised in 1897, is $599,547.49.
The latest (1917) approved estimate for annual cost of maintenance
is $2,500.
   The existing project was adopted by the River and Harbor Act of
June 14, 1880; and dredging through the bar, if found advisable, was
authorized by the River and Harbor Act of June 25, 1910. The
various features of the plan of improvement and its modifications are
40       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

defined in Annual Reports of the Chief of Engineers for the fiscal
years ending June 30, 1881, page 502; 1882, page 509; 1883, page 437;
1884, pages 494, 497; 1886, page 558; 1897, page 825; 1899, page 63;
1910, page 60. The latest published maps will be found in House
Document No. 339, Fifty-ninth Congress, second session, and in
House Document No. 1813, Sixty-fourth Congress, second session.
   Terminal facilities.-The terminal facilities consist of 14 wharves
extending along a frontage of about 3,500 feet of the south bank of
the Merrimack River below the highway bridge and one small pier
on the north side of the river.
   The terminal facilities are considered adequate for existing com-
merce. For full description, see Port Series No. 24, the Ports of
Northern New England, 1934.
   Operations and results during fiscal year.--Under contract for
repair of the jetties at the mouth of the river, in progress at the
beginning of the fiscal year, 18,495 tons of stone were placed in the
north jetty, partially completing a section about 2,485 feet long,
and 8,645 tons were placed on the south jetty, partially completing
a section about 800 feet long. The cost was $82,242.63 for main-
tenance. The U. S. seagoing hopper dredge Minquas was engaged
in dredging on the outer bar at the mouth of the Merrimack River
from June 14 to 17, 1937, when the dredge grounded on the bar. It
was undergoing repairs from June 18 to 23. Operations were re-
sumed on June 25, 1937. During the fiscal year 13,397 cubic yards,
bin measurement, of material were removed, at a cost of $4,845.65
for maintenance. The total costs during the year were $87,088.28
for maintenance. The expenditures were $81,981.08.
   Condition at end of fiscal year.-The existing project is about 97
percent completed. The north jetty was completed in 1914; the
south jetty was completed, except for a length of about 30 feet at
its outer end, in the fiscal year 1905. Plum Island Basin was closed
during the fiscal 'ear 1883. North Rock was removed in July 1901.
The timber dike has fallen into disrepair. Considerable settlement
and storm damage has occurred to both jetties, so that the greater
portions of each are submerged at high water, and the rubblestone
mounds, which were constructed in 1932 and 1933 to mark the outer
ends of the jetties, have been seriously damaged by storm action.
These damages are now being repaired. A survey in 1937 showed
that the bar at the mouth of the river had shoaled so that there was
a depth of only about 4 feet at mean low tide. Dredging over the
bar is now in progress. The bar consists of shifting sand, and con-
ditions change rapidly and frequently. The total costs have been
$616,323.22, of which $463,843.62 was for new work and $152,479.60
for maintenance. The total expenditures have been $595,788.30.
   Proposed operations.-The funds unexpended at the end of the
fiscal year, amounting to $96,919.83, together with an allotment of
 $25,000 from the War Department Appropriation Act of July 19,
1937, will be applied as follows:
Accounts payable June 30, 1937_________________       __-_______ $20, 534.92
Maintenance: Complete, by Oct. 1, 1937, an existing contract for re-
  pairs to north and south jetties_-    ---   ___          -__-____--60, 230. 56
     Dredging on the outer bar with U. S. hopper dredge Minquas
                                ..       .
       (July-September 1937) ------------------------------     41, 154. 35
       Total.   ------------------------------------------ 121, 919. 83
                    RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                                                          41
  With the completion of the above work during the fiscal year
1938 the improvement of Newburyport Harbor, Mass., will be in
a condition to meet the reasonable requirements of present and pros-
pective commerce. Accordingly, no funds can be profitably ex-
pended during the fiscal year 1939.
                                                 Cost and financial summary
Cost of new work to June 30, 1937--------           ----- ---                                                                             $463,843.62
Cost of maintenance to June 30, 1937- ----------------------                                                                               152, 479. 60
     Total cost of permanent work to June 30, 1937--------- --- 616, 323. 22
Minus accounts payable June 30, 1937-----------------------20, 534.92
     Net total expenditures    ------------------------------                                                                               595, 788. 30
Unexpended balance June 30, 1937 -----------------------                                                                                  - 96, 919. 83
            Total amount appropriated to June 30, 1937-------------692, 708.13

           Fiscal year ending June 30                                  1933                 1934                 1935              1936             1937


Cost of new work-----------...........--------------..........--..--------------.........----.....................-----------.......------------
Cost of maintenance.....-------------------..................      $5, 808. 13 ..........---------------------...........       $22, 526. 81      $87, 088. 28
Total expended.........................------------------------.     5, 398. 13             $410. 00 ......-------------          7, 099. 09       81, 981. 05
Allotted.......................-----------------------------         5, 848. 13            -40.     00     ........-----------.. 165, 000. 00      21, 000. 0


Balance unexpended July 1, 1936- ....                                                      -----                            .        - $157,900.91
Amount allotted from War Department Appropriation Act approved
May 15, 1936---------------   ----------------------------                                                                                     21, 000. 00
      Amount to be accounted for ____________________    __                                                                                 178, 900. 91
Gross amount expended-------------------------$82,017.08
Less reimbursements collected -------   _---__----    36. 00
                                                                                                                                                81, 981.08
      Balance unexpended June 30, 1937 ----- _--------                                                                                          96, 919. 83
Outstanding liabilities June 30, 1937------------------ $20. 12
Amount covered by uncompleted contracts----------75, 919. 83
                                                                                                                                                75, 939. 95

     Balance available June 30, 1937-    ..--------------                                                                                       20, 979. 88
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------                                                                                       25, 000.00

      Balance available for fiscal year 1938------- ---------                                                                                   45, 979. 88
Amount (estimated) required to be appropriated for completion of
existing project - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                     - --- --
                                                                                                                                            135, 700. 00
   2
  Exclusive of available funds.

            9. GLOUCESTER HARBOR AND ANNISQUAM RIVER, MASS.
  Location.-GloucesterHarbor is situated at the southern extremity
of Cape Ann, about 23 miles northeast by water from Boston Harbor.
Annisquam River is a narrow tidal waterway extending across the
base of Cape Ann from Gloucester Harbor on the south side to
Ipswich Bay on the north side, a distance of approximately 4 miles.
A reach of this waterway, at the Gloucester Harbor end, for a length
of about 1,800 feet, is known as the Blynman Canal. (See U. S.
Coast and Geodetic Survey Chart No. 243.)
  Previous projects.-Projects for Gloucester Harbor were adopted
by River and Harbor Acts of June 10, 1872, August 5, 1886, and
         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

June 3, 1896. The cost and expenditures on projects prior to the
adoption of the existing project were $21,000 for new work. There
were no previous projects for Annisquam River. For further details
see page 1740 of Annual Report for 1915.
  Existing project.-This provides:
    Gloucester Harbor.-
    (a) For a rubblestone breakwater 2,250 feet long, surmounted by
a superstructure of dry walls of heavy split stone enclosing a core
of rubblestone from Eastern Point over Dog Bar to Cat Ledge.
    (b) For the removal of three ledges in the inner harbor, 1 to 12 feet
and 2 to 15 feet depth at mean low water, and five ledges in the outer
harbor, 4 to 18 feet and 1 to 25 feet depth at mean low water, aggre-
gating a total of 2,206 cubic yards, place measurement.
    (c) For removal to depth of 15 feet below mean low water of
:ledges and boulders obstructing the approach to the wharves between
Harbor Cove and Pews Wharf, near the head of the inner harbor;
dredging to the same depth the channel leading past the wharves
and dredging Harbor Cove to the depth of 10 feet at mean low
water.
    Annisquam River.-For a channel 8 feet deep at mean low water
60 feet wide from Gloucester Harbor to the Boston & Maine Railroad
Bridge, 100 feet wide from the railroad bridge to the mouth of the
river, and 200 feet wide across the bar in Ipswich Bay, including the
removal of a ledge near the Gloucester Harbor entrance.
    The mean range of tide in Gloucester Harbor is 8.9 feet; the ex-
.treme range is 12.6 feet. The mean range of tide in Annisquam
River is 8.8 feet; the extreme range is about 10 feet.
    The estimates of cost for new work, exclusive of amounts expended
on previous projects, are as follows:
    Gloucester Harbor.-
    (a) For breakwater, $416,083.43, revised in 1902; (b) removal of
eight ledges, $51,000, made in 1908; (c) for removal of ledges and
boulders, and dredging, $65,000, made in 1887. The latest (1928)
approved estimate for annual cost of maintenance of the breakwater
is $1,000.
    Annisquam River.-$32,500, made in 1932. The latest (1932) ap-
proved estimate for annual cost of maintenance is $3,500.
   The existing project for Gloucester Harbor was authorized by the
following river and harbor acts: (a) The act of August 18, 1894,
provided for the breakwater from Eastern Point to Round Rock
Shoal (H. Ex. Doc. No. 56, 48th Cong., 2d sess.); and act of June
138, 1902, authorized the termination of the breakwater at Cat Ledge;
 (b) act of June 25, 1910, provided for the removal of eight ledges
  (H. Doc. No. 1112, 60th Cong., 2d sess.); (c) act of August 11, 1888,
provided for the removal of ledges and boulders, and dredging
 (Annual Report for 1887, p. 503).
    The existing project for Annisquam River was adopted by the
River and Harbor Act of August 30, 1935 (Rivers and Harbors Com-
mittee Doc. No. 39, 72d Cong., 1st sess.).
   References to latest published maps.-Project of 1888 for removal
of ledges and boulders, and dredging (Annual Report for 1887, pp.
504 and 506); project of 1894 for breakwater and project of 1910 for
ledge removal (H. Doc. No. 1112, 60th Cong., 2d sess.). The latest
          RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                        43
published map of Gloucester Inner Harbor and Annisquam River is
in Rivers and Harbors Committee Document No. 39, Seventy-second
Congress, first session.
   Terminal facilities.-There are in Gloucester Harbor 60 wharves
worthy of mention. The depth beside the wharves varies from 0 to
18 feet at mean low water. Except for two wharves owned by the
city, all are private and are not available to the public. The Com-
monwealth of Massachusetts is constructing a fish pier extending
from the mainland of East Gloucester to Five Pound Island. There
are two commercial wharves on Annisquam River, on the east bank.
   These facilities are considered adequate for the commerce of the
port. For full description see Port Series No. 24, The Ports of
Northern New England, 1934.
   Operations and results during fiscal year.-Under contract for new
work dredging in Annisquam River, work was commenced August
3, 1936, and a channel was dredged 8 feet deep at mean low water,
60 feet wide from Gloucester Harbor to the Boston & Maine Railroad
bridge, 100 feet wide from the railroad bridge to the mouth of the
river, and 200 feet wide across the bar in Ipswich Bay, and a small
ledge near its Gloucester Harbor entrance was removed. A total of
91,773 cubic yards, scow measurement, of material was removed from
the river. The contract was completed November 2, 1936, at a cost
of $33,975.89, for new work, completing the project of August 30,
1935, for Annisquam River. The expenditures were $33,909.99.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936 at a saving of $29,400 under the estimated cost. The
removal of all ledges and boulders in Gloucester Harbor between
Harbor Cove and Pews Wharf, and other obstructing rocks, was
completed in 1896; the dredging of a channel in front of the wharves
and in Harbor Cove was completed in 1894, and the removal of a
pinnacle rock in the outer harbor in 1896, all at a cost of $66,681.65.
The breakwater, completed in 1905, was built at a cost of $410,097.19.
The removal of all ledges was completed in 1916 at a cost of $24,400.
The improvement of Annisquam River was completed November 2,
1936. The controlling depths over the ledges in the outer harbor, as
ascertained in 1916, are from 18 to 25 feet, the controlling depth,
as ascertained in 1931, over the ledges in the inner harbor was 14.6
feet. The controlling depth in 1936 in Annisquam River was 8 feet
at mean low water. The costs have been $501,178.84 for new work
in Gloucester Harbor and $36,992.71 for maintenance, a total of
$538,171.55. The cost of new work in Annisquam River was $33,-
975.89. The total costs have been $535,154.73 for new work and
$36,992.71 for maintenance, a total of $572,147.44. The expenditures
have b.en $538,237.45 for Gloucester Harbor and $33,909.99 for Annis-
quam River, a total of $572,147.44.
   Proposed operations.-No funds are available and no work is
proposed during the fiscal years 1938 and 1939.
                         Cost and financial summary
Cost of new work to June 30, 1937   __________________$__      _ $556, 154.73
Cost of maintenance to June 30, 1937--------------------------     36, 992. 71
      Total cost of permanent work to June 30, 1937-----------     593, 147. 44
Net total expenditures__ __--_-----                                593,147. 44
Total amount appropriated to June 30, 1937-----___           -     593. 147.44
44                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


            Fiscal year ending June 30                              1933          1934        1935               1936          1937

Cost of new work-----                  --------------------------------  -----------------                                   $33,975.89
Cost of maintenance-- -----------------             ------------ $7,064. 02 ------------ $6, 531.90                              .----------
Total expended..---------------------......................... ..    .....----   6, 864. 02   $200.00        6, 597.80        33, 909. 99

Allotted---.-------------------------$2,607.37                                   6, 864. 02    200. 00      39, 031. 90        1,475. 89


Balance unexpended July 1, 1936---------------------------     $32, 434.10
Amount allotted from War Department Appropriation Act approved
May 15, 1936--------      -----------------------------------   2, 000. 00

      Amount to be accounted for_____--------- --                                                    ----    -            34, 434. 10
Deductions on account of revocation of allotment                                                                                    11
                                                                                                                              5-----------------524.

      Net amount to be accounted for--------------------------                                                            33, 909. 99
Gross amount expended                _------------------------------------_                                               33, 909. 99

                                                10. MYSTIC RIVER, MASS.

    Location.-This river rises in Mystic Lakes, Mass., flows in a south-
(easterly direction, and empties into Boston Harbor near the Charles-
town Navy Yard. It is 7 miles in length. (See U. S. Coast and
Geodetic Survey Chart No. 248 and U. S. Geological Survey Chart
 "Boston.")
     Previous projects.-Original project for the lower Mystic was
adopted by the River and Harbor Act of March 3, 1899, and curtailed
by the River and Harbor Act of June 25, 1910. The cost and ex-
penditures prior to the adoption of the existing project (expenditures
on which began in 1910) were $125,723.20 for new work and $10,281.92
for maintenance, a total of $136,005.12. For further details see page
1743 of Annual Report for 1915.
     There has been no previous project for the upper Mystic.
     Existing project.-This provides for a channel 30 feet deep at mean
low water downstream from the mouth of Island End River, through
the Chelsea (north) Bridge to the 35-foot channel of Boston Har-
  bor, about one-half mile, 600 feet wide at the upper end, and grad-
  ually narrowing to 300 feet wide at the lower end, and widening
  of the entrance channel leading to Mystic Wharf; a channel 30 feet
  deep at mean low water and 500 feet wide upstream from the mouth
  of Island End River to the city playground at Charlestown; a chan-
  nel 6 feet deep at mean low water and 100 feet wide from the Boston
  & Maine Railroad (western division) bridge to about 2,500 feet above
  Wellington Bridge, about 1 mile, and thence 4 feet deep at mean low
  water, gradually narrowing from 100 feet to 50 feet at the upper end
  for about 2 miles to the head of commercial navigation at Cradock
  Bridge in Medford. The mean range of tide is 9.6 feet. The extreme
  range is 13.7 feet.
     The estimate of cost for new work, revised in 1935, is $672,000,
  exclusive of amounts expended on previous projects. The latest
   (1935) approved estimate of cost for annual maintenance of the
  existing project is $6,000.
     The existing project was authorized as follows: The River and
  Harbor Act of June 25, 1910, provided for the improvement of the
  channel downstream from the mouth of Island End River to the
         RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                 45
35-foot channel of Boston Harbor (H. Doc. No. 1086, 60th Cong.,
2d sess.) ; the improvement of the channel upstream from the mouth
of Island End River to the city playground at Charlestown was
authorized May 28, 1935, under the Emergency Relief Appropriation
Act of 1935, and by the River and Harbor Act of August 30, 1935
 (Rivers and Harbors Committee Doc. No. 33, 74th Cong., 1st sess.).
The River and Harbor Act of July 13, 1892, provided for the im-
provement of the upper Mystic (Annual Report for 1891, p. 672).
A map showing the entire river is published in House Document No.
2108, Sixty-fourth Congress, second session.
   Terminal facilities.-In the section of the river benefited by the
30-foot channel project there are on the south bank of the river four
wharves aggregating over 4,000 feet of berthing space used for the
receipt, storage, and shipment of coal, lumber, and gypsum. These
wharves consist of substantial stone or wooden bulkheads, filled solid,
and in some cases fronted by pile platforms. There is also on the
south bank a lumber terminal, the largest of its kind on the Atlantic
coast. It is equipped with the most modern mechanical appliances,
has railroad connection, and occupies 4,400 feet of water front. On
the north bank of the river within the scope of this improvement
there is a large wharf for receipt and shipment of oil on an extensive
scale; immediately adjacent to this wharf is an extensive terminal
constructed in connection with an iron works; on the west bank of
Island End River, which flows into Mystic River on the north about
midway of the 30-foot channel, are situated two large terminal
wharves, of 800 feet dockage, for receipt and shipment of coal, coke,
tar, and oil. These wharves are connected with the 30-foot channel
by a channel 30 feet deep at mean low water, dredged by private
interests. None of the above wharves is publicly owned, and none
is open to general public use.
   Beyond the scope of the 30-foot channel improvement, and ap-
proaching and within the scope of the improvement of the upper
Mystic, there are on the south bank in Charlestown and Somerville
about 1,850 feet, and on the north bank in Medford about 1,235 feet
of available dockage, of which 450 feet on the south bank and 435
feet on the north bank are customarily in use. A large automobile
assembly plant is located on the south bank in Somerville.
   The existing wharves consist of stone and wooden bulkheads, solid
filled. None is publicly owned, but two are open to the public on
payment of wharfage charges. The capacities of the lower Mystic
are being utilized to a gratifying extent.
   These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year--Emergency Relief
funds.-Under contract dated August 9, 1935, dredging of a chan-
nel 500 feet wide and 30 feet deep at mean low water, extending
upstream from the mouth of Island End River to a point opposite
the city playground at Charlestown, in progress at the beginning of
the fiscal year, was completed April 10, 1937. There were removed
during the year 627,197 net cubic yards, scow measurement, of ma-
terial, at a cost of $197,023.51, for new work. The expenditures were
$251,209.90.
   Regular funds.-Detail probing of the ledge areas uncovered in
the dredging of the 30-foot channel upstream from the mouth of
46       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Island End River was commenced by hired labor and Government
plant on April 27, 1937, and on June 30, 1937, was about 90 percent
completed. The cost was $5,167.26 for new work. For inspection,
supervision, etc., of dredging the 30-foot channel upstream from
the mouth of Island End River, under contract of August 9, 1935,
the cost was $26,160.52 for new work. The total cost was $31,327.78
for new work. The expenditures were $30,528.16. The total costs
during the fiscal year, all funds, were $228,351.29 all for new work.
The expenditures were $281,738.06.
    Condition at end of fiscal year.-The existing project is about 98
percent completed. The channel from the mouth of Island End
River downstream to the 35-foot channel in Boston Harbor was
completed in 1914. To adapt the project to the openings in the draw
span of the Chelsea North Bridge, built by the city of Boston, the
channel above the bridge was widened along the western edge; this
work was completed in 1914. In 1916 the channel was cleared of
shoals, restoring a controlling depth of 30 feet at mean low water.
The dredging of the channel from the mouth of Island End River
upstream to the city playground at Charlestown was completed
April 10, 1937. Work on removal of shoal-ledge areas uncovered in
the dredging has not been commenced. A channel of the projected
dimensions was completed in the upper Mystic in 1906. A survey in
1916 showed that the portion of the channel normally 6 feet deep
had an available depth of about 4.5 feet at mean low water, and that
while the portion of the channel normally 4 feet deep had that depth
throughout its length, the width had been contracted by caving of
the banks. A survey made in 1935 by the Commonwealth of Massa-
chusetts indicated that the controlling depth in the lower Mystic was
30 feet at mean low water to the easterly side of the mouth of Island
End River. The costs from regular funds under the existing project
have been $186,754.69 for new work, and $15,252.81 for maintenance,
a total of $202,007.50. The expenditures have been $201,207.88. The
costs under the Emergency Relief Appropriation funds have been
$475,000, all for new work, the expenditures being the same. Total
costs under all funds have been $661,754.69 for new work and $15,-
252.81 for maintenance, a total of $677,007.50. The expenditures have
been $676,207.88.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $4,471.84 together with $60,000 allotted from
the War Department Appropriation Act of July 19, 1937, will be
applied as follows:
                                 -____-__________-_____
Accounts payable June 30, 1937_---                                    $799. 62
New work :
    Completion of ledge probings in 30-foot channel upstream from
      Island End River, hired labor (July 1937) -------------------- 3, 672. 22
    Removal of ledge areas in the 30-foot channel upstream from
      Island End River, by contract (September 1937-June 1938)__ . 60, 000. 00

        Total-------------          --------------------------       64, 471. 84
  No additional funds can be profitably expended during the fiscal
year 1939, as it is not believed any work will be necessary during
that year.
                  RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                                                 47
                                             Cost and financial summary
                                   MAINTENANCE               AND IMPROVEMENT FUNDS


Cost of new work to June 30, 1937_______________------                                                                          $312, 477. 89
Cost of maintenance to June 30, 1937 --------------------------                                                                   25, 534. 73

      Total cost of permanent work to June 30, 1937                                                                              338, 012. 62
Minus accounts payable June 30, 1937_--------799.                                                                                          62

     Net total expenditures________-_______-----------                                                                           337, 213. 00
Unexpended balance June 30, 1937_-------------------------                                                                         4,471. 84

             Total amount appropriated to June 30, 1937----------------                                                          341, 684. 84


             Fiscal year ending June 30                           1933             1934                 1935             1936            1937


Cost of new work                     ------------                                  --                                                  $31,327.78
Cost ofmaintenance--------------------                                            ----------------                 ------------         -
Total expended                                                                      --      --                                          30, 528. 16
Allotted__                                                                                       --                                     35,000. 00



Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936___________________________________                                                                         $35, 000. 00
Gross amount expended______________________________                                                                               30, 528. 16

             Balance unexpended                   June 30, 1937_______________________                                                4, 471. 84
Outstanding liabilities June 30, 1937 ----------------------------                                                                    4, 471. 84
Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937 ---------------                                                                                            60, 000. 00
Balance available for fiscal year 1938__                                                                                             60, 000. 00
                                                 EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937--------------------                                                          ----             $475, 000. 00
Cost of maintenance to June 30, 1937_______________

      Total cost of permanent work to June 30, 1937 ____________                                                                 475, 000. 00
Net total expenditures___________                                                                                                475, 000. 00
Total amount appropriated to June 30, 1937 _________________                                                                     475, 000. 00


             Fiscal year ending June 30                           1933              1934                1935             1936             1937


Cost of new work.-------------------------                                                                         $277, 976.49       $197, 023. 51
Cost of maintenance .------------------------------------------                                          -

Total expended              _          ---------------------------       ------------            -----------   _      223, 790. 10     251, 209. 90
Allotted........------
                  ------------------                       ----------             -------- $475,
                                                                                               000.00



Balance unexpended July 1, 1936___                                                           --------------    $251,209.90
Gross amount expended_                                                                            $260, 784.04
Less reimbursements collected __                                                                     9,574.14
                                                                                                                251, 209. 90
             20196-37--pt. 1-4
48               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

       CONSOLIDATED            COST AND            FINANCIAL SUMMARY                          FOR MYSTIO         RIVER,     MASS.

Cost of new work to June 30, 1937 --    ----------------------                                                             $787,477. 89
Cost of maintenance to June 30, 1937_________----                                                                            25, 534. 73

      Total cost of permanent work to June 30, 1937 -----                                                                   813, 012. 62
Minus accounts payable June 30, 1937__--_-----------.--.                                                                         799. 62

     Net total expenditures-- -----     _____-_               812, 213. 00
Unexpended balance June 30, 1937 ----------------------------   4, 471. 84

          Total amount appropriated to June 30, 1937                                                                        816, 684. 84


          Fiscal year ending June 30                           1933                    1934           1935          1936          1937


Cost of new work_.                                       .-................
                                                    __ _......__              _-----            _--
                                                                                                 -      --     $277, 976. 49   $228, 351. 29
Cost of maintenance ...........----
Total expended-- -----....................-   .-     .                  ......                               -_ 223, 790. 10    281, 738.06
Allotted-.....                                .                     -----------                               ----
                                                                                                                .-------------------------
                                                                                               $475, 000. 00 .35,        -     000. 00


Balance unexpended July 1, 1936----------------------         $251, 209. 90
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936---    ---------------------------------   35, 000. 00
      Amount to be accounted for ----------                                                       -        -     -____-286,
                                                                                                                          209. 90
Gross amount expended                                                                                 .-$_____----_____--$291,
                                                                                                             312. 20
Less reimbursements collected--_-----__   ------ __-                                                      9, 574. 14
                                                                                                                     281, 738.06

      Balance unexpended June 30, 1937------------------------                                                                 4, 471. 84
Outstanding liabilities June 30, 1937---------------------------                                                               4, 471. 84
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937-----       ------------------------------ 60, 000. 00
Balance available for fiscal year 1938--   -_____-------- -        60, 000. 00
                                         11. BOSTON HARBOR, MASS.

  Location.-This harbor includes all the expanse of tidewater lying
within a line from Point Allerton to Point Shirley and extending
from that line westward to the mainland. This comprises an area
of about 47 square miles, exclusive of the islands. (See U. S. Coast
and Geodetic Survey Charts Nos. 246 and 248.)
  Previous projects.-Adopted by the River and Harbor Acts of
March 2, 1867, June 14, 1880, September 19. 1890, June 3, 1896, and
July 25, 1912. The total cost and expenditures were $1,465,122.96
for new work and $17,879.26 for maintenance, a total of $1,483,002.22,
of which $139,064.51 was applied to the Nantasket Beach and Jeffries
Point Channels and Charles River, $1,216,634.42 to the 23-foot chan-
nel and $127,303.29 to Chelsea Creek, of which $17,879.26 was for
maintenance. For further details see page 1743 of annual report for
1915 and page 81 of annual report for 1917.
  Existing project.-This provides for a channel 40 feet deep in gen-
eral, but 45 feet deep through rock, from the sea to President Roads
through Broad Sound, 2 miles, 900 feet wide except at the outer end
where it is widened to 1,100 feet; deepening the main ship channel
from President Roads past the United States Navy drydock no. 3 at
South Boston to Commonwealth pier no. 1, East Boston, to 40 feet for
         RIVERS AND HARBORS-BOSTON, MASS., DISTRICT               49
a width of 600 feet with suitable widening at the bend in the channel;
an anchorage area 2,000 feet wide, 5,500 feet long, and 40 feet deep,
on the north side of President Roads; deepening to 40 feet that part
of the approach channel to the United States Navy drydock no. 3 at
South Boston between the main ship channel and the United States
harbor line; a channel 35 feet deep from the sea (along the same
line as the 40-foot channel) through Broad Sound to the navy yard
at Charlestown and the Chelsea North, Meridian Street, and Charles
River Bridges, 1,500 feet wide from the sea to President Roads 1.5
miles and thence 1,200 feet wide for the remaining distance of 6
miles; a channel 2 miles long, 30 feet deep, and 1,200 feet wide from
the sea to President Roads through Broad Sound by a less direct
route than the 35- and 40-foot channels; a channel 27 feet deep and
1,000 feet wide from Nantasket Roads to President Roads, 3 miles; a
channel 15 feet deep, 300 feet wide, and 550 feet long through the
bar which extends from the north head of Long Island to Nixes Mate
Shoal, known as "Nixes Mate" or "Nubble Channel"; a channel in
Chelsea Creek generally 30 feet deep and 200 feet wide, from the
mouth of the creek, at the head of the 35-foot channel in Boston
Harbor, to a point opposite the Hartel Oil Co. terminal; the Fort
Point Channel, 23 feet deep and 175 feet wide from its entrance in
Boston Harbor, about four-fifths of a mile to near the Dorchester
Avenue (old Federal Street) Bridge; and sea walls of coursed stone
and riprap protecting the most exposed headlands and islands. All
depths are referred to mean low water.
   The mean range of tide is 9 feet at Boston Light and 9.6 feet in
the upper harbor, in Chelsea Creek, and in Fort Point Channel. The
extreme range is about 4 feet greater.
   The estimate of cost for new work, revised in 1937, exclusive of
amount expended on previous projects and of sea walls for which
no estimate was given, is $17,640,700. The latest (1937) approved
estimate for annual cost of maintenance is $112,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1825, provided for the preservation
of the islands by sea walls; the act of August 5, 1886, provided for
Fort Point Channel (H. Ex. Doc. No. 206, 48th Cong., 2d sess.) ; the
act of July 13, 1892, provided for the 27-foot channel (see p. 766 of
Annual Report for 1893) ; the act of June 13, 1902, provided for the
35-foot channel (H. Doc. No. 119, 56th Cong., 2d sess.), the estimate
differing from any in that document owing to the different widths of
the channels adopted; and the omission from the project of the re-
moval of Finns Ledge, at the outer entrance, was authorized by the
Chief of Engineers March 11, 1913; the act of August 8, 1917, pro-
vided for the 40-foot channel in Broad Sound (H. Doc. No. 931,
63d Cong., 2d sess.); the act of August 30, 1935, provided for the
40-foot channel from President Roads to Commonwealth pier no. 1,
East Boston, 600 feet wide, with an anchorage area 40 feet deep,
2,000 feet wide and 5,500 feet long, on the north side of President
Roads (H. Doc. No. 244, 72d Cong., 1st sess.), and the deepening to
40 feet of that part of the approach channel to the United States
Navy drydock no. 3 between the main ship channel and the United
States harbor line (Rivers and Harbors Committee Doc. No. 29, 74th
Cong., 1st sess.). Prior to inclusion in the River and Harbor Act
50        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of 1935, the 40-foot anchorage area was authorized by the Public
Works Administration September 6, 1933. The act of August 26,
1937, provided for the 30-foot channel in Chelsea Creek (Rivers and
Harbors Committee Doc. No. 24, 75th Cong., 1st sess.).
   References to latest published maps: President Roads to Bridges
and the anchorage area, House Document No. 244, Seventy-second
Congress, first session; 40-foot approach channel to United States
Navy drydock no. 3, Rivers and Harbors Committee Document
No. 29, Seventy-fourth Congress, first session; sea walls and Nixes
Mate Channel, page 1178 of Annual Report for 1911; 27-, 30-, 35-,
and 40-foot channels, House Document No. 931, Sixty-third Congress,
second session; Chelsea Creek, Rivers and Harbors Committee Docu-
ment No. 24, Seventy-fifth Congress, first session; Fort Point Chan-
nel, location shown on map facing page 770 of the Annual Report
for 1903.
   Local cooperation.-The River and Harbor Act of August 30, 1935,
required that local interests furnish assurances, satisfactory to the
Secretary of War, that they will, by the time that the 40-foot channel
in Boston Harbor is completed, provide suitable approach channels
and berths of 40 feet depth at sufficient of the terminals for the proper
utilization of the improvement. The Commissioner of Public Works,
Commonwealth of Massachusetts, in letter to the Chief of Engineers,
United States Army, dated August 8, 1935, gave assurance that the
Commonwealth of Massachusetts will meet the conditions imposed
by the act of August 30, 1935, by dredging the approach channels to
a depth of 40 feet from the Boston and Albany piers in East Boston,
and from Commonwealth Pier No. 5, South Boston, to the main ship
channel. This dredging has been done. The River and Harbor Act
of August 26, 1937, requires that local interests agree to lower the
existing sewer siphon in Chelsea Creek near the Chelsea Street Bridge
if and when found necessary by the Secretary of War.
   Terminal facilities.-The wharf development of Boston Harbor
lies westerly of Governors and Castle Islands. Bordering on the
35- and 40-foot channel and below all bridges there is about 4 miles
of water front, fully developed with wharves of various types devoted
to commercial purposes; and on the Charlestown shore is located the
United States Navy Yard, with a frontage of about five-eighths of
a mile.
  Easterly of the wharf development on the East Boston front the
Commonwealth of Massachusetts contemplates the development of
an extensive area of shore frontage which will ultimately include
a system of large modern piers, extensive manufacturing and stor-
age areas, and complete railroad connections. Only a portion of the
bulkheading and filling has been done on this development to date.
The Boston airport has been established on the westerly portion of
the filled area.
  There are numerous public and private wharves, piers, ferry slips,
and drydocks; for description, see pages 56 to 59 of the Annual
Report for 1932, and Port Series No. 2, Corps of Engineers, revised
1936.
  Operation and results during fiscal year-Regular funds-New
work.--Under contract for dredging the northwest corner of section
                                             --
          RIVERS AND HARBORS-BOSTON,              MASS,   DISTRICT     51
A of the 40-foot anchorage, work was commenced October 8, 1936,
and completed March 12, 1937, thereby completing the anchorage
area. There were removed 249,529 net cubic yards, scow measurement,
of material, at a cost of $96,594.18 for new work.
   Detail probing of ledge areas in the 40-foot channel to ascertain the
extent and amount of ledge'to be removed was commenced by Gov-
ernment plant and hired labor in December 1936 and to June 30, 1937,
about 65 percent of the work had been completed, at a cost of
$27,729.89.
   The total cost from regular funds was $124,324.07, all for new work.
The expenditures were $121,414.17.
   Emergency Relief funds.-The contract of February 20, 1936, work
on which was in progress at the beginning of the fiscal year, was
completed January 13, 1937.
   The dredging covered the 40-foot channel for the project width of
600 feet and a length extending southeasterly from abreast Common-
wealth pier no. 6, South Boston, to President Roads, and that part
of the approach channel to the United States Navy Dry Dock No. 3,
South Boston, between the main ship channel and the United States
Harbor Line. There were removed 991,518 net cubic yards, scow
measurement, of material at a cost of $545,287.64, for new work.
   Work, by hired labor, in making detailed probings of the ledge
areas uncovered in the course of the 40-foot channel dredging was
completed in November 1936, at a cost of $9,855.27 for new work.
The probings were thereafter continued with regular funds.
   The total cost under the Emergency Relief appropriation funds was
$5 5,142.91 for new work. The expenditures were $746,438.91.
   The costs for the year, all funds, were $679,466.98, all for new work;'
The total expenditures were $867,853.08.
   Condition at end of fiscal year.-Under the existing project sea
walls of a total length of about 3.75 miles have been built and are
being maintained on Great Brewster, Lovells, Gallops, Long, Rains-
ford, Deer, and Georges Islands, and on Point Allerton. The Nixes
Mate or Nubble Channel was completed in 1892, the 30-foot channel
in 1905, the 27-foot channel in 1907, Fort Point Channel in 1909, the
35-foot channel in 1915, the Broad Sound 40-foot channel in 1930,
and the 40-foot anchorage in 1935-37. Under the project for the
40-foot channel from President Roads to Commonwealth pier no. 1,
East Boston, and deepening to 40 feet the approach channel to the
United States Navy drydock no. 3 at South Boston, authorized by
the River and Harbor Act of 1935, the dredging is completed from
President Roads to Commonwealth pier no. 6, South Boston.
   To complete the 40-foot channel in the inner harbor, there remain
the removal of shoal ledge areas and the dredging of a reach of the
channel extending from Commonwealth pier no. 6, South Boston, to
Commonwealth pier no. 1, East Boston. No work has been done on
the 30-foot channel in Chelsea Creek authorized by the River and
Harbor Act of 1937.
   The. controlling depth in the 35-foot channel (1934) was 35 feet
at mean low water; 40 feet (1930) in the Broad Sound 40-foot chan-
nel; and 40 feet (1937) in the 40-foot anchorage. The controlling
depth in the 40-foot channel in the inner harbor (1937) is 35 feet.
52        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The controlling depth of Fort Point Channel, as ascertained in
1930, was 21.5 feet at mean low water; of Chelsea Creek in 1936, 21.6
feet from mouth to down-river end of Hartol Oil Co. terminal, thence
8 feet to the bend just below the head of navigation; and of Nixes
Mate Channel in 1930, 15 feet.
   The total costs under regular funds have been $12,360,224.93, of
which $10,964,555.10 was for new work, and $1,395,669.83 for main-
tenance. The total expenditures have been $12,357,315.03.
  The total costs and expenditures under the Public Works funds
have been $1,030,806.26, all for new work.
  The total costs under the Emergency Relief Administration funds
have been $935,000, all for new work, the total expenditures being
the same.
   Total costs, all funds, have been $12,930,361.36 for rtew work and
$1,395,669.83 for maintenance, a total of $14,326,031.19. The total
expenditures have been $14,323,121.29.
  Proposed operations.-The balance unexpended, including accounts
receivable, at the end of the fiscal year, amounting to $30,251, together
with $900,000 allotted since July 1, 1937, will be applied as follows:
Accounts payable June 30, 1937---------- __-    __----  __-____-      $5, 225. 69
New work:
    Completion of detail probings of ledge area in 40-foot channel,
     hired labor (July-August 1937) -------------------------         25, 025. 31
    Partial removal of ledge areas in 40-foot channel by contract--_ 900, 000. 00

      Total -__------------------------------------------- 930, 251. 00
  The funds that can be profitably expended during the fiscal year
1939 ($1,026,000) will be applied to new work as follows:
Dredging the reach of the channel extending from Commonwealth
pier no. 6, South Boston, to Commonwealth pier no. 1, East
  Boston, to depth of 40 feet at mean low water, thereby com-
pleting the dredging of the 40-foot channel in the inner harbor,
by contract (July 1938-June 1939) -_-----__-         __--____                 $385, 000.00
Dredging Chelsea Creek from 35-foot channel in Boston Harbor to
  a point opposite Hartol Oil Co. terminal, 30 feet deep and 200
  feet wide, completing project of August 26, 1937, by contract
  (July 1938-June 1939) -------      ------------------------                   641, 000. 00

      Total ------------------------------------------                        1, 026, 000. 00

                                 Cost and financial summary

                          MAINTENANCE         AND IMPROVEMENT FUNDS


Cost of new work to June 30, 1937--- ____--------
                                              _-1               ----        $13, 460, 484.32
Cost of maintenance to June 30, 1937_---__ ------- ---                 --     1, 413, 549. 09

      Total cost of permanent work to June 30, 1937---------                14, 874, 033.41
Plus accounts receivable June 30, 1937 ____--__- ___-------2,                        315. 79

     Gross total costs to June 30, 1937---------------------                14, 876, 349. 20
Minus accounts payable June 30, 1937_-----------------                            5, 225.69

     Net total expenditures_______ _______________1--                        14, 871, 123. 51
Unexpended balance June 30, 1937--------------------                              27, 935. 21

      Total amount appropriated to June 30, 1937-------                      14, 899, 058. 72
  SIncludes $1,030,806.26 Public Works funds.
                    RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                                                   53

    Fiscal year ending June 30                           1933                  1934             1935            1936                   1937


Cost of new work-------------------------                               $588, 320. 25        $442, 486. 01 --------------            $124, 324.07
Cost of maintenance------------.......                $117, 052. 97       104, 188. 07         16, 552. 84    $13,067. 32     ..............
        Total cost ...............----------------.    117, 052. 97       692, 508. 32        459, 038. 85     13, 067. 32            124, 324.07
Total expended-.................                       104, 766. 02       637, 834. 44        497, 873. 59     19, 269.74             121, 414. 17
Allotted.............________. __                      237, 902. 52       782, 394. 98        199, 571. 73    147, 477. 53                4, 349. 38



Balance unexpended July 1, 1936 ...----           _---------- -                                                              $145, 000. 00
Amount allotted from War Department Appropriation Act
  approved May 15, 1936----------------------------------                                                                      22, 349. 38
     Amount to be accounted for--------------------------                                                                     167, 349. 38
Deductions on account of revocation of allotment------------                                                                   18, 000. 00
      Net amount to be accounted for__ ___     __-_-_____-                                                             -      149, 349. 38
Gross amount expended-__----       --       _-- $122, 047. 30
Less reimbursements collected _______------           633. 13
                                                                                                                              121, 414. 17

      Balance unexpended June 30, 1937 -------------------                                                                      27, 935. 21
Outstanding liabilities June 30, 1937_ ------------- --------                                                                    5, 258. 61

     Balance available June 30, 1937---------__---------                                                                        22, 676. 60
Accounts receivable June 30, 1937 .__________--__--- - - -                                                                       2, 315. 79

     Unobligated balance available June 30, 1937---------                                                                    - 24, 992. 39
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937________--------------------                                                                       900, 000. 00

            Balance available for fiscal year 1938__-----------------                                                         924, 992. 39

Amount (estimated) required to be appropriated for comple-                                                                 2, 326 000. 00
tion of existing project 2________________________________                                                                           ,
Amount that can be profitably expended     in fiscal year ending
                                 -- ----- --- - ----------- ----- -
  June 30, 1939, for new work --                                                                                           1, 026, 000. 00
2 Exclusive of available funds.
                                                       EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937---------------------                                                                       $935, 000. 00
Cost of maintenance to June 30, 1937--------------------
                                                                                                                              935, 000. 00
      Total cost of permanent work to June 30, 1937 ........                                                                  935, 000. 00
Net total expenditures---------------------                                                                                   935, 000. 00
Total amount appropriated to June 30, 1937---________-                                                                        935,        000.   00




            Fiscal year ending June 30                                1933            1934             1935         1936                  1937

Cost of new work-------------------------.......................... -             ------------ ---------       $379,857.09           $555, 142. 91
Cost of maintenance....-----------------
Total expended--------............................-------.....-------.....--      ----------------------        188, 561.09           746, 438. 91
Allotted----------------------                                -------------------------------                   935, 000. 00


Balance unexpended July 1, 1936....------------------------$746,438.91
Gross amount expended--------------------------- $748, 209. 59
Less reimbursements collected1---------------------    , 770. 68
                                                                 746, 438. 91
54           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

       CONSOLIDATED        COST AND FINANCIAL SUIMMARY                           FOR BOSTON HARBOR, MASS.

Cost of new work to June 30, 1937 - ___-___- -                                   -         -               _    $14, 395, 484. 32
Cost of maintenance to June 30, 1937-- -------                                                                    1, 413, 549. 09
                                                                                                                  1__---____
      Total cost of permanent work to June 30, 1937______ -                                                        15, 809, 033. 41
Plus accounts receivable June 30, 1937__----------- --- -   -                                                        -   2, 315. 79

      Gross total costs to June 30, 1937---------------------                                                      15, 811, 349. 20
Minus accounts payable June 30, 1937_...____-___________                                                           -     5,225. 69
     Net total expenditures -_________'15,                                                                                806, 123. 51
Unexpended balance June 30, 1937__ _______________---27,                                                                       935. 21

         Total amount appropriated to June 30, 1937-------------                                                115, 834, 058. 72


   Fiscal year ending June 30             1933              1934                     1935                   1936               1937


Cost of new work_..                   -----------..
                                _._._.. .              $588,320.25               $442, 486. 01           $379, 857. 09       $679, 466.98
Cost of maintenance..___.....___        $117,052.97     104, 188. 07               16, 552. 84             13, 067.32
      Total cost---------------        117, 052. 97      692, 508. 32             459, 038.85            392, 924.41          679, 466.98

Total expended----------------          104, 776.02      637,834. 44              497, 873. 59            207, 830. 83        867, 853.08

                __..... __ ..
Allotted............                   237, 902.52       782, 394. 98             199, 571.73          1,082,477.53             4, 349.38



Balance unexpended July 1, 1936___                                                                                       $891, 438.91
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_______                                                                                                22, 349. 38
      Amount to be accounted for                                                                                         913, 788. 29
Deductions on account of revocation of allotment---------------                                                           18, 000. 00

                                               -
      Net amount to be accounted for_________________-__-                                                                 895, 788. 29
Gross amount expended __________________-        $870,256. 89
Less reimbursements collected--_______-________     2, 403. 81
                                                                                                                          867, 853. 08
      Balance unexpended June 30, 1937__                                                                                   27, 935. 21
Outstanding liabilities June 30, 1937____.________________________                                                           5, 258. 61

         Balance available June 30, 1937________________________                                                           22, 676. 60
Accounts receivable June 30, 1937_                                                                                          2, 315. 79

         Unobligated balance available June 30, 1937_____________                                                          24, 992. 39
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937                                                                                                   9--------------------------------
                                                                                                                          900, 000. 00

         Balance available for fiscal year 1938-                             -         -          ----                    924, 992. 39
Amount (estimated) required to be appropriated for completion
   of existing project                   __           __----------_                                                 2, 326, 000. 00
Amount that can be profitably expended in fiscal year ending
   June 30, 1939, for new work                   --                   --------                 -----                1,026,,000. 00
  1 Includes $1,030,806.26 Public Works funds.
  2Exclusive of available funds.

                           12. WEYMOUTH FORE RIVER, MASS.

  Location.-Rises in Braintree, Mass., and flows in a northerly di-
rection 7.5 miles, emptying into Hingham Bay, Boston Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 246.)
  Previous projects.-Adopted by the River and Harbor Act of Sep-
tember 19, 1890, and extended by the River and Harbor Acts of March
         RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                 55


3, 1905, February 27, 1911, and July 27, 1916. The cost and expendi-
tures prior to the adoption of the existing project of August 30, 1935,
were $635,900 for new work and $5,250 for maintenance, a total of
 $641,150, exclusive of $100,000 expended from contributed funds. For
further details see page 1745 of Annual Report for 1915, and page 64
of Annual Report for 1932.
    Existing project.-This provides for a channel 27 feet deep at mean
low water with a general width of 300 feet from Hingham Bay to
Weymouth Fore River Bridge at Quincy Point, about 3 miles. The
mean range of tide is 9.5 feet. The extreme range is 13.6 feet. The
estimate of cost for new work, made in 1932, is $506,500, exclusive
of amounts expended on previous projects. The latest (1932) ap-
proved estimate for annual cost of maintenance is $2,000.
    The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 207, 72d Cong., 1st sess.) The latest
published map is in that document.
    Local cooperation.-The River and Harbor Act of August 30,
1935, required that local interests furnish assurances satisfactory to
the Secretary of War that they will dredge and maintain a channel
of equal depth and suitable width, extending at least 2,500 feet
through and upstream from the Weymouth Fore River Bridge. The
Commissioner of Public Works, Commonwealth of Massachusetts,
in letter to the Chief of Engineers, United States Army, dated
August 8, 1935, gave assurance that the Commonwealth of Massa-
chusetts will meet the conditions imposed by the act of August 30,
1935. This dredging has been done.
    Terminal facilities.-At the head of the Federal improvement at
Quincy Point Bridge there are, on the westerly side below the bridge,
two wharves with aggregate dockage of 800 feet, one of masonry and
one of masonry and concrete with pile platform extension. On the
easterly side there is a wharf about 600 feet in length, in front of
which the owners have dredged to 24 feet at mean low tide. A large
electric power plant is located at this point.
    Above Quincy Point Bridge and served by the Commonwealth of
Massachusetts improvements are eight wharves in use for ivater-
borne freight. There is also a terminal, with a depth of 32 feet,
used for the receipt of petroleum. In this area is the Fore River
plant of the Bethlehem Shipbuilding Corporation, with depths up
to 32 feet, used for the building and equipping of large naval and
commercial vessels.
    These facilities are considered adequate for the existing commerce.
    Operations and results during' fiscal year.-Contract dredging of
the 27-foot channel was commenced August 17, 1936, and continued
through February 2, 1937, on which date dredging was discontinued
pending sounding and sweeping operations. Redredging of shoal
areas was commenced May 5, 1937, and continued through June 16,
1937, when dredging was suspended pending a survey to determine
the amount of material to be removed and additional funds required
for completion of the work. There were removed during the fiscal
year 538,417 net cubic yards, scow measurement, of material and 83
cubic yards of boulders. The costs were $253,602.46 for new work.
   A submerged water main between Nut Island and Peddocks Island,
Hingham Bay, Mass., was repaired under contract during the period
September 24 to October 12, 1936, at a cost of $4,192.61 for new work.
56               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The total costs during the fiscal year were $257,795.07 for new
work. The expenditures were $224,253.23.
   Condition at end of fiscal year.-The existing project is about 51
percent completed. The controlling depth is 24 feet at mean low
water. The cost under the existing project has been $257,795.07 for
new work. The expenditures have been $224,253.23.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $39,246.77, together with an allotment of
$247,500 from the War Department Appropriation Acts of April 9,
1935, and July 19, 1937, will be applied as follows:
Accounts payable June 30, 1937________________-____   _________ $33, 541. 84
New work: Complete by September, 1937, contract of August 5, 1936,
  for dredging the 27-foot channel----------------------------20,      704. 93
    Ledge removal, to complete the 27-foot chanel, summer and fall
      of 1938 --------------------------------         ---------- 232, 500. 00

           Total                ---------------------------------------------                                     286, 746. 77
                                             Cost and financial summary
Cost of new work to June 30, 1937______________________                                                       $893, 695. 07
Cost of maintenance to June 30, 1937-------------------------                                                    5, 250. 00
     Total cost of permanent work to June 30, 1937---  --------                                                   898, 945.07
Minus accounts payable June 30, 1937___------------------------                                                    33, 541. 84
     Net total expenditures  ------------------------------                                                   1865,    403. 23
Unexpended balance June 30, 1937------- --------------                                                             39, 246. 77
           Total amount appropriated to June 30, 1937 -----                                    __--    -      1   904, 650. 00

           Fiscal year ending June 30                           1933           1934     1935           1936             1937


Cost of new work ...------------------------------------------------.-----                                           $257,795.07
C ost of m aintenance ....        ...-.-.---
                                          .-.----
                                                -                            ------.-- ----------                .
                                                                                                                -.
                                                                                                ----------------..
Total expended.........-----------------------------------------------------------                                    224,253.23
                    .
Allotted-...... --------------------                                                     - $274,000. 00
                                                       ------------ ------------ ---------                           -10, 500. 00


Balance unexpended July 1, 1936-             -------------------------- $274, 000. 00
Amount allotted from War Department Appropriation Act approved
May 15, 1936-------------------------------                 -----------  29, 500.00
      Amount to be accounted for__----------------                                                    --          303, 500. 00
Deductions on account of revocation of allotment ----------.-                                         _            40, 000. 00
      Net amount to be accounted for------------__----___                                                         263, 500. 00
Gross amount expended-------------------------    $224, 253.47
Less reimbursements collected- -----------.-.--.            24
                                                                                                                  224, 253. 23
    Balance unexpended June 30, 1937 __---...__-------39,                                                              246. 77
Amount covered by uncompleted contracts __-   _________----------                                                  39, 246. 77

Amount allotted during July 1937------------------- ---------                                                     247, 500. 00
Balance available for fiscal year 1938_ ------
                                            __ ________-------                                                    247, 500.00
   1 In    addition $100,000 was expended from contributed funds.

                                              13. TOWN RIVER, MASS.
  Location.-Town River is a tidal river 2 miles long lying entirely
within the limits of the city of Quincy, just south of Boston, Mass.
It flows in an easterly direction and empties into Weymouth Fore
         RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                  57
River at Quincy Point. (See U. S. Coast and Geodetic Survey Chart
No. 246).
   Previous project.-Adopted by the River and Harbor Act of June
3, 1896. The total cost and expenditures were $25,000 for new work
and $12,577.41 for maintenance, a total of $37,577.41. For further
details see page 65 of annual report for 1907.
   Existing project.-This provides for a channel 24 feet deep at mean
low water and generally 150 feet wide from deep water in Weymouth
Fore River to a point opposite the upstream end of the Quincy Oil
Co. terminal, a distance of 6,700 feet, with a turning basin 18 feet
deep, 400 feet wide, and roughly 1,000 feet long at the inner end; and
a channel 15 feet deep and 100 feet wide, thence to a point just below
the plant of the Quincy Electric Light & Power Co., a further distance
of 1,370 feet. The mean range of tide is 9.5 feet. The extreme range
is 11 feet.
   The estimate of cost of new work, made in 1936, is $456,400, of which
30 percent is to be contributed by local interests; exclusive of amounts
expended under the previous project. The latest (1936) approved
estimate for annual cost of maintenance is $6,000. The existing
project was adopted by the River and Harbor Act of August 26, 1937
 (H. Doc. No. 96, 75th Cong., 1st sess.). The latest published map is
in that document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
requires that local interests contribute 30 percent of the initial cost
of the entire improvement, furnish free of cost to the United States a
suitably located right-of-way 400 feet wide and spoil-disposal areas,
bulkheaded where necessary, for new work and for subsequent main-
tenance as required, and release the United States from all claims for
damages attributable to the work of improvement. By act of the
legislature approved May 29, 1937, the Commonwealth of Massa-
chusetts appropriated $68,460 toward the improvement. It is ex-
pected that the appropriation by the city of Quincy of $68,460 will
be made and the other requirements of local cooperation met by the
the time the Government funds are available.
   Terminal facilities.-On the south bank of Town River are located
two small yacht repair and storage yards, a ship repair yard with a
floating drydock and marine railways suitable for commercial vessels
of tonnages up to 1,000 and 700, respectively (these are privately
owned and are considered adequate for existing commerce), three oil
terminals, and a lumber company. On the north bank of the river is
located a yacht yard with marine railways capable of handling vessels
up to 200 tons. For full description see Port Series No. 2, Corps of
Engineers, revised 1936.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--No work has been done under the
existing project adopted August 26, 1937. The controlling depth
 (1936) from the mouth to the Quincy Oil Co. terminal was 10 feet
at mean low water; thence 4 feet to the Quincy Lumber Co. wharf.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938. The sum of $319,480 can be profit-
ably expended during the fiscal year 1939 to be applied to new work,
dredging by contract, in completion of the project adopted August
26, 1937. In addition, $136,920 is required to be contributed by local
interests.
58         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                              Cost and financial summary

                                 -------
Cost of new work to June 30, 1937__                          __                  $25, 000. 00
Cost of maintenance to June 30, 1937------------------------                      12, 577. 41
      Total cost of permanent work to June 30, 1937  ---              ___-----   37, 377. 41
Net total expenditures _____-----___________                     __              37, 577. 41
Total amount appropriated to June, 1937_---- _--_-----37,                            577. 41

Amount (estimated) required to be appropriated for completion of
existing project 1____________    __________- __     _               319, 480. 00
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work __________-.___________----               -_      319, 480. 00
  'In addition, $136,920 to be contributed by local interests.

                          14. SCITUATE HARBOR, MASS.

   Location.-Scituate Harbor is a well-sheltered bay on the Atlantic
coast, 14 miles southeast of the entrance to Boston Harbor and 3'3
miles northwest of the Massachusetts Bay entrance to the Cape Cod
Canal. Much of the harbor area of 190 acres runs bare at low tide.
 (See U. S. Coast and Geodetic Survey Charts Nos. 232 and 1207.)
   Previous projects.-Adopted by the River and Harbor Act of June
14, 1880. Previous to this a small expenditure was made between
1829 and 1852 in protecting the beach between Cedar Point and the
mainland. The costs and expenditures were $95,090.98 for new work
and $31,500 for maintenance, a total of $126,590.98. For further
details see page 76 of Annual Report for 1931.
   Existing project.-This provides for an entrance channel 200 feet
wide and 12 feet deep at mean low water from that depth in Massa-
chusetts Bay to a point 70 feet west of the existing south jetty, thence
a harbor channel 10 feet deep and generally 150 feet wide extending
westward 1,500 feet; an anchorage 10 feet deep, 1,500 feet long and
460 feet in average width along the north side of the harbor channel;:
and for maintenance of the north and south jetties to their present
lengths of 720 and 450 feet, respectively. The mean range of tide is.
9.8 feet. The extreme range is about 0.5 feet greater.
   The estimate of cost for new work, made in 1937, is $139,560, exclu-
sive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $3,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (Rivers and Harbors Committee Doc. No. 26, 75th
Cong., 1st sess.). The latest published map is in that document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
requires that the State (Commonwealth of Massachusetts) or other
interests agree to dredge and maintain a channel not less than 6 feet
deep at mean low water and 100 feet wide to the town wharf, and an
anchorage area of the same depth, approximately 400 feet wide and
1,000 feet long, northward of the 6-foot area provided by the State
in 1935. State and local interests gave assurance at a public hearing,
June 25, 1937. that the requirements of local cooperation would be
met when the improvement is undertaken by the United States.
   Terminal facilities.-There are three wharves, one formerly used
for the receipt of coal and lumber, one owned by the town and used
as a public landing, and one used as a yacht pier. None of these
wharves has any railroad connection, but each has good highway fa-
              RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                     59

cilities. No elaborate freight-handling machinery, etc., is available.
The facilities appear to be adequate for existing demands.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project of August 26, 1937. In 1936, the entrance channel
had a controlling depth of 13 feet at mean low water for a width of
approximately 160 feet to a point abreast of the north jetty; thence 9
feet for a width of 100 feet to the main anchorage basin; 8.5 to 10
feet in the main anchorage basin; 5.1 to 9 feet in the yacht anchorage
basin, and 7 feet for a width of 80 feet from the main anchorage ba-
sin to the town wharf.
   Proposed operations..--No funds are available and no work is con-
templated during the fiscal year 1938. The sum of $139,560 can be
profitably expended during the fiscal year, 1939, to be applied to new
work, dredging by contract, in completion of the project adopted
August 26, 1937.
                              Cost and financial summary
Cost of new work to June 30, 1937_                                   $95, 090.98
Cost of maintenance to June 30, 1937        -....                     31, 500. 00
       Total cost of permanent work to June 30, 1937______________   126, 590. 98
Net   total   expenditures                           ----------
                                                         __          126, 590. 98
Total amount appropriated to June 30, 1937---------------------      126, 590. 98
Amount (estimated) required to be appropriated for completion of
  existing     project --                           -----------      139, 560.00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work --                                       139, 560. 00
                             15. CAPE COD CANAL, MASS.

   Location.-This waterway is a sea-level canal, extending from the
head of Buzzards Bay, Mass., to a point on Cape Cod Bay about 15
miles southeast of Plymouth Harbor, Mass. In general direction
the canal trends from Buzzards Bay easterly to Cape Cod Bay. (See
U. S. Coast and Geodetic Survey Charts Nos. 251 and 1208).
   Existing project.-This provides for the purchase of the Cape Cod
Canal at a cost to the United States of $11,500,000; for an open canal
32 feet deep at mean low water with a width of 540 feet in the land
cut, 500 feet in a straight channel in Buzzards Bay to Wings Neck,
and 700 feet beyond Wings Neck, a harbor of refuge for small ves-
sels, by dredging a channel 15 feet deep and 100 feet wide into
Onset Bay; mooring basins; the construction of two fixed highway
bridges having a horizontal clearance of 550 feet between the main
piers with a vertical clearance at mean high water of 135 feet; the
construction of a railroad bridge with a vertical lift of 500-foot span,
and 135 feet vertical clearance when the span is raised; an improved
lighting system, and other accessory and minor features which may
be deemed necessary, and to be in accordance with plans approved
by the Chief of Engineers.
    The land cut is 7.7 miles long, and with approach channels, the
total length of the canal is 131/2 miles.
    The mean range of tide in Cape Cod Bay is 9.1 feet and in Buz-
zards Bay 3.9 feet. The mean range of spring tides is about 13 feet
in Cape Cod Bay, and 6.5 feet in Buzzards Bay.
60       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimate of cost for new work, revised in 1935, is $27,145,000,
exclusive of $11,500,000, purchase price of the canal. The latest
 (1936) approved estimate for annual cost of maintenance is $619,000,
including $219,000 for operation and care.
    The purchase of the canal from the Boston, Cape Cod & New
York Canal Co., in accordance with the contract dated July 29, 1921,
executed by that company (H. Doc. No. 139, 67th Cong., 2d sess.), was
authorized by section 2 of the River and Harbor Act approved
January 21, 1927.
    Prior to the River and Harbor Act of 1935, the Public Works
Administration under date of September 6, 1933, authorized con-
struction of the three bridges and widening the canal to 205 feet
  (H. Doc. No. 795, 71st Cong., 3d sess.), and under date of April 29,
1935, authorized construction of a mooring basin. Dredging and
bank-protection work was authorized May 28, 1935, under the Emer-
gency Relief Appropriation Act of April 8, 1935.
    The existing project was subsequently adopted by the River and
SHarbor Act of August 30, 1935 (Rivers and Harbors Committee Doc.
No. 15, 74th Cong., 1st sess.). Operation and care of the canal and
appurtenant works were included in the project July 1, 1935, under
the provisions of the Permanent Appropriations Repeal Act ap-
proved June 26, 1934.
   The latest published map of the canal and approaches is printed
in Rivers and Harbors Committee Document No. 15, Seventy-fourth
Congress, first session.
   Terminal facilities.-The only terminals on the canal are those of
the Canal Fish Freezing Co. and the Standard Oil Co. The former
is used for the receipt and freezing of fish and the latter for the
receipt and storage of oil. The terminals are considered adequate
for the purposes for which they are used. The Commonwealth of
Massachusetts has constructed a State pier on the north bank of the
canal at Bourne Neck.
    Operations and results during fiscal year-Regular funds, new
work.-Contract for dredging Hog Island Channel by hydraulic
dredge to a depth of 32 feet at mean low water over a bottom width of
350 feet from station 490+00 to station 665 +00, and over a bottom
width varying from 350 feet at station 665 +00 to 175 feet at station
670+00, and for the satisfactory disposal of material in a dike ap-
proximately parallel to the channel extending 11,000 feet from Stony
Point (station 520+00 to station 630+00) in progress at the begin-
ning of the fiscal year, was completed February 8, 1937. During the
fiscal year, 4,126,648 cubic yards, place measurement, of ordinary ma-
terial were removed and deposited in constructing a dike approxi-
mately parallel to the channel, extending from Stony Point south-
westerly about 2 miles (station 520 + 00 to station 627 + 50). The cost
was $702,830.19 for new work.
   Under a continuing contract for dipper dredging in Cape Cod Canal
to a depth of 25 feet over a bottom width varying from 0 feet at sta-
tion 37 + 00 to 190 feet at station 70+ 00, and to a depth of 32 feet over
a bottom width of 315 feet from station 70+00 to station 205+00,
work was commenced July 1, 1936, and to June 30, 1937, 2,580,110
         RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                  61
cubic yards, scow measurement, of ordinary material, and 5,237 cubic
yards of boulders were removed at a cost of $1,003,620.32 for new
work. Of this amount, $3,063.45 was for hired labor in drilling and
blasting surface boulders to be removed as ordinary material by the
dredging contractor.
   Under a continuing contract for dipper dredging to a depth of 32
feet at mean low water in Cape Cod Canal and Hog Island Channel in
Buzzards Bay (stations 205 to 490) and widths varying from 165 feet
to 390 feet; the complete removal and disposal of the five piers of the
old Buzzards Bay Railroad bridge and the old Bourne Highway
Bridge; and dredging a channel leading to Onset Bay to a depth of
17 feet at mean low water and width of 100 feet, work was commenced
July 1, 1936. During the year, 2,437,886 cubic yards, scow measure-
ment, of ordinary material, and 5,954.3 cubic yards of boulders were
removed. The channel leading to Onset Bay was completed. The
drilling of the old bridge piers was completed and the two piers at
the old railroad bridge and two piers at Bourne Bridge were removed.:
The costs during the year were $1,025,291.55 for new work. Of this
amount, $9,450.90 was for hired labor in drilling and blasting surface
boulders to be removed as ordinary material by the dredging
contractor.
   Under contract for construction of a steel-sheet pile bulkhead from
station 18 to station 36 along the south bank of the canal, work was
commenced August 18, 1936, and completed February 4, 1937, at a
cost of $140,928.84 for new work.
   Under contract for removal and disposal of a concrete bridge pier
of the old Sagamore Highway Bridge, work was commenced July 6
and completed July 14, 1936, at a cost of $4,693.64 for new work.
    Under contract for excavating and placing revetment from station
10+50 to about station 28+50, and from about station 45+00 to
station 70+00, excavating a ditch, and constructing a reinforced con-
crete pipe culvert at station 76+76, all on the north side of the canal,
work was commenced July 11, 1936, and completed October 6, 1936,
at a cost of $102,864.09.
    Under a continuing contract for excavating and placing revetment,
constructing a bituminous macadam roadway, pipe drains, reinforced
concrete culverts, flumes, etc., within the area extending from station
150+00 to station 255+00, along the north bank of the canal, work
was commenced October 7, 1936, and to June 30, 1937, was about 82
percent completed. The cost was $439,899.89 for new work.
    Under a continuing contract for hydraulic dredging in Hog Island
Channel, Buzzards Bay, to a depth of 32 feet at mean low water
over a bottom width of 185 feet from station 446+00 to station 472 + 00
on the north side of the canal and the dredging of a mooring basin to a
depth of 32 feet at mean low water on the south side of the channel
between stations 430+00 and 470+00; and for dredging in the canal
to a depth of 32 feet at mean low water over a bottom width of 180
feet from station -10+70 to station 70+00, work was commenced
May 17, 1937, and to June 30, 1937, 879,000 cubic yards, place measure-
ment, of ordinary material had been removed from the Hog Island
Channel and the mooring basin at the west end of the canal, at a cost
62      REPORT OF CHIEF. OF ENGINEERS, U. S. ARMY, 1937

of $178,473.58 for new work. Of this amount $314.51 was for hired
labor in drilling and blasting surface boulders to be removed as
ordinary material by the dredging contractor.
   Under a contract for constructing a wood pile and timber launch-
way and a wood pile and timber foundation for a boathouse on the
south bank of the canal, work was commenced May 24, 1937, and to
June 30, 1937, the work was about 32 percent completed. The cost
during the year was $5,246.21 for new work.
   The United States seagoing hopper dredge W. L. Marshall com-
menced dredging at the east end of the canal on February 16, 1937,
and continued operations to June 30, 1937, except for the periods
March 26 to March 28, 1937, and June 15 to June 20. 1937, when
repairs to the dredge were being made. A total of 780,648 cubic
yards, bin measurement, of material were removed between stations
 -28+1-00 and 70+00, at a cost of $98,139.08 for new work.
   Hired-labor work with regular funds consisted of preliminary
surveys, preparation of plans and specifications in connection with
dredging and construction work to be done by contract, preliminary
to advertising the work. The cost during the fiscal year was
$12,749.88 for new work.
   During the fiscal year various Engineer Department buildings
and the old Coast Guard buildings at Sandwich, Mass., in the way of
the canal widening, were removed by hired labor at a cost of $6,336.01
for new work.
   Maintenance.-The United States seagoing hopper dredge
Minquas was engaged in maintenance dredging in the canal at
intervals from July 20, 1936, to April 28, 1937, during which periods
520,424 cubic yards, bin measurement, of material were removed from
the canal and approaches at a cost of $109,174.54 for maintenance.
   Operating and care of canal.-The canal was open to navigation
and the railroad bridge operated throughout the year. The cost was
$198,062.53 for maintenance.
   Work under contract for constructing roadways around the United
States Engineer suboffice at Buzzards Bay was commenced July 18
and completed August 11, 1936, at a cost of $7,462.94 for mainte-
nance. The total cost of the operating and care work was $205,-
525.47 for maintenance.
   The costs during the fiscal year from regular funds were $3,721,-
073.28 for new work and $314,700.01 for maintenance, a total of
$4,035,773.29. The expenditures were $3,485,348.21.
   Public Works funds, new work.-The relocation of 17,596 feet of
railroad on the south side of the canal between Bourne and Saga-
more, work on which was in progress at the beginning of the fiscal
year under the agreement with the New York, New Haven & Hart-
ford Railroad Co., dated July 12, 1935, was completed December 14,
1936, at a cost during the fiscal year of $1,156.35 for new work.
   The final report on model study of the Cape Cod Canal and ap-
proaches was submitted by the Massachusetts Institute of Technol-
ogy. The cost was $617.50 for new work.
   Hired-labor work with Public Works funds consisted of prelimi-
nary surveys and studies incident to bank-revetment work and re-
location of the railroad. The cost was $21,885.03 for new work.
         RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                63
   The total costs from Public Works funds during the year were
$23,658.88 for new work. The expenditures were $8,053.84.
  Emergency Relief funds.-The contract for dredging a channel in
Buzzards Bay 32 feet deep at mean low water and 150 feet wide
over a length of 15,000 feet (station 520 to 670), work on which was
in progress at the beginning of the fiscal year, was completed Sep-
tember 4, 1936. There were removed during the fiscal year 108,612
cubic yards, scow measurement, of ordinary material, and 10.6 cubic
yards of boulders. The cost was $49,141.02 for new work.
   Work on the eight contracts for dry excavation and revetment of
the banks of the canal at various places, in progress at the beginning
of the fiscal year, was completed, at a cost of $616,462.89 for new
work.
   The changes in the railroad track and yard, required because of
change in location of the new railroad bridge crossing the canal at
Buzzards Bay, which had been 98 percent completed by the New
York, New Haven & Hartford Railroad Co. under the agreement of
July 12, 1935, were completed September 30, 1936, at a cost during
the fiscal year of $34,040.25 for new work.
   During the year land with improvements, totaling about 30.3 acres
was acquired at a cost of $56,592.30 for new work.
   A new power switchboard was installed in the new power sub-
station at Bourne, Mass.. at a cost of $1,768.95 for new work.
   Hired-labor work with Emergency Relief funds consisted of pre-
liminary surveys in connection with widening the canal to 540 feet.
The cost was $5,235 for new work.
  The total costs during the fiscal year from Emergency Relief ap-
propriation funds were $763,240.41 for new work. The expenditures
were $1,446,517.13.
  The costs during the fiscal year, all funds, were $4,507,972.57 for
new work, and $314,700.01 for maintenance, a total of $4,822,672.58.
The total expenditures were $4,939,919.18.
   Condition at end of fiscal year.-The existing project is about 60
percent completed. The canal in the land line has a least bottom
width of 205 feet and is spanned by two high-level highway bridges
and a vertical-lift railroad bridge. At the easterly end of the canal
a mooring basin has been dredged to a depth of 25 feet at mean low
water. The new Hog Island Channel was opened to navigation on
April 22, 1937. The controlling depth in the canal on June 30, 1937,
was 22.5 feet at mean loW water. The controlling depth in the Hog
Island Channel, Buzzards Bay, was 23.9 feet at mean low water over
a channel width of 315 feet. The canal and properties were taken
over by the United States on March 31, 1928, at a cost of $11,500,000.
  The total cost from regular funds has been $15,228,999.15 (of
which $11,500,000 was the purchase price) for new work, and $2,340,-
326.63 for maintenance, a total of $17,569,325.78. Expenditures have
been $16;982,894.84.
  The total cost from Public Works funds has been $6,138,157.30 for
new work. Expenditures have been $6,138,157.30.
  The total cost from Emergency Relief Administration funds has
been $4,764,096.72 for new work. Expenditures have been $4,763,-
383.48.
     20196---37-pt. 1-5
64        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The total costs, all funds, were $26,131,253.17 for new work (in-
cluding $11,500,000, the purchase price), and $2,340,326.63 for
maintenance, a total of $28,471,579.80. The expenditures have been
$27,884 435.62.
   In addition, the sum of $1,658,354.71 was expended between March
31, 1928, and June 30, 1935, on the operating and care of the works
of improvement, under the provision of the permanent indefinite
appropriation for such purposes.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the fiscal year, amounting to $776,-
746.30, of which $771,889.08 pertains to regular funds and $4,857.22 to
Emergency Relief appropriation funds, together with an allotment
of regular funds of $3,785,000 from the War Department Appropria-
tion Act of July 19, 1937, will be applied as follows:
Regular funds: Accounts payable June 30, 1937------            __----     - $586, 574. 36
New Work:
   Completion of a continuing contract for dredging channel
     25 feet deep and widths varying from 0 to 190 feet,
      stations 37 to 70, to depth of 32 feet and width of 315
     feet from station 70 to station 205 (July 1937-April
     1938) ---------------------------------------------                     661, 500. 00
   Completion of a continuing contract for dredging channel
     32 feet deep and widths varying from 165 to 390 feet,
     stations 205 to 490; removal of 5 piers of old highway
     bridges; and dredging a channel leading to Onset Bay
     17 feet deep and 100 feet wide (July 1937-April 1938)___             1, 138, 500. 00
   Completion of a continuing contract for dry excavation
     and revetment along north bank of canal between sta-
     tions 150 and 255 (July-October 1937)        ----------------
                                                              _               75, 000. 00
   Dredging (by hydraulic dredge) to Hog Island Channel,
     between stations 430 and 472, to widen channel to 500
      feet and deepen to 32 feet, with adjoining mooring basin,
     and in Cape Cod Canal between stations -11+50 and
     70 to widen channel to 480 feet and deepen to 32 feet,
     under existing continuing contract, about 2,100,000
      cubic yards (July-October 1937) _----------____-__                    425, 000. 00
   Dredging (by dipper dredge) to Hog Island Channel, be-
      tween stations 414 and 542-50 to widen channel to 500
      feet and deepen to 32 feet, under contract, about 675,400
      cubic yards (September 1937-March 1938) -------        ______         368, 000. 00
   Dredging by United States seagoing dredge at eastern end
      of canal, and in Buzzards Bay west of station 670 to full
      project dimensions (July-December 1937)--____________                 144, 000. 00
   Construction of service roads on north bank of canal, and
      revetment behind east mooring basin, and service roads
      on south side of canal, and revetment in vicinity of Gray
      Gables, by contract (September 1937-March 1938) _____                  125, 000. 00
   Completion of construction of launchway and boathouse
      foundation, south side of canal at Sandwich, Mass., by
      contract (July-August 1937) _- _____                _-______            10, 000. 00
   Construction of storehouse at Engineer Reservation, Buz-
      zards Bay, by contract (August-December 1937) __1
   Removal of boulders in land cut dredging in connection
                                                                     -        17, 500. 00
      with hydraulic dredging work and hopper dredging, by
      contract (February-June 1938) -----------------------                   36, 000. 00
   Dredging between stations 70 and 414, to widen channel to
      480 feet and deepen to 32 feet, on completion in April
      1938 of existing dipper dredging contracts, by contract
      (April-June 1938)      ._                                   -555,           000. 00
   Contingencies                  --------------------------                 129, 814. 72

           Total new work-- -------                  __________--3, 685. 314. 72
            RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                     65
Maintenance:
    Dredging by United States hopper dredge, 3 months (Jan-
      uary-March 1938) ------------------------------------                       $72, 000. 00
    Operation and care of canal:
        (a) Operation of canal, bridges, etc-_ .. $75, 105.00
        (b) Ordinary maintenance and repair.... 94, 500.00
        (c) Improvements and reconstruction __     17, 689.00
        (d) Channel work ---------------------     14, 500.00
        (e) Emergencies and contingencies------- 11, 206. 00

                 Total operating and care---------------------                    213, 000. 00
                 Total, maintenance---------------------------                    285, 000. 00

                 Grand total, regular funds--------------------                4, 556, 889. 08
Emergency Relief fundss:
   Accounts payable June 30, 1937 __-- -------------------                           1, 812. 30
   Payment of award for land in condemnation proceedings
     on decree of court _--_------------------------------                           3,044. 92
          Total___----------------------------------------------                    4, 857. 22
  The funds that can be profitably expended during the fiscal year
1939, $2,563,000, will be applied as follows:
New work:
   Continuance of dredging operations, between stations 70
     to 414, to widen channel to 480 feet and deepen to 32
     feet (July 1938-June 1939) -----------------                              $1, 755, 000. 00
       Lighting -------------                                                      100, 000.00
       Bank protection-----------------------------------                           64, 000. 01
        Dolphins-------------------------------------------                        200, 000.00
       Miscellaneous--------------------------------------                         100, 000. 00
             Total--------------------------------------------                  2, 219, 000. 00
Maintenance :
     Dredging by United States seagoing dredge, 6 months___                       125, 000.00
     Operation and care of canal:
         (a) Operation of canal, bridges, ete                                      80, 000.00
         (b) Ordinary maintenance and repair--......___.                           91,000. 00
         (c) Improvements and reconstruction ---------------                       23, 000. 00
         (d) Channel work ---------------------------------                        15, 000. 00
         (e) Emergencies and contingencies -------------------                     10, 000. 00
                 Total operating and care_                                        219, 000. 00
                 Total, maintenance---------------------------                    344, 000. 00
                 Total----------------------------------------                  2, 563, 000. 00
                              Cost and financial summary
                        M AINTENANCE     AND IMPROVEMENT      FUNDS

Cost of new work to June 30, 1937__________________________                  $15,228, 999. 15
Cost of maintenance to June 30, 1937_______________________                   13, 998, 681. 34
      Total cost of permanent work to June 30, 1937----------                 19, 227, 680. 49
Plus accounts receivable June 30, 1937_____________-----------------------             143. 42
      Gross total costs to June 30, 1937---------------------_                19, 227. 823.91
Minus accounts payable June 30, 1937__-----------------------___________          586, 574. 36
      Net total expenditures-------------------------------                   18, 641, 249. 55
Unexpended balance June 30, 1937---------------------------                       771, 745. 66
       Total amount appropriated to June 30, 1937_- ..--                   - -119, 412, 995. 21
  ' Includes $1,658,354.71 expended from the permanent indefinite appropriation.
66               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


    Fiscal year ending June 30                            1933                 1934                 1935                    1936                   1937


Cost of new work----------------....----------------------------------------                                               $7, 925.87         $3, 721, 073. 28
Cost of maintenance-------------............. $528,289.93 $370, 664.43 $813, 163. 35                                      350, 718. 60            314, 700. 01

        Total cost-----------------................. 528, 289.93             370, 664. 43       813, 163. 35              358, 644. 47         4, 035, 773. 29

Total expended------........------..........         515, 462.66             344, 738. 94       746, 915. 12              329, 767. 21         3,485, 348. 21

Allotted-------------------------                    875, 395. 39            392, 693.90        597, 528. 76         3, 454, 822. 98             816, 000. 00


Balance unexpended July 1, 1936--------------- ------___                                                                            $3, 441, 093. 87
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936------------------------------------                                                                                     907, 000. 00
     Amount to be accounted for --------      ____--- __-__-                                                                             4, 348, 093. 87
Deductions on account of revocation of allotment--..........                                                                                 91, 000. 00
Net amount to be accounted for_-          ---                                                   -___-_____ -                          4, 257, 093. 87
Gross amount expended-- .------------                                                         $3, 521, 005. 14
Less reimbursements collected----_____---                                              ---         35,656. 93
                                                                                                                                         3, 485, 348. 21
      Balance unexpended June 30, 1937         ----------                                                                                    771, 745.66
Outstanding liabilities June 30, 1937---------           33, 494. 35
Amount covered by uncompleted contracts------           618, 167. 92
                                                                                                                                             651, 662. 27
      Balance available June 30, 1937_ ------.----...                                                    ---                                 120, 083.39
Accounts receivable June 30, 1937 ___- -------                                                          ____          -                  -        143. 42

     Unobligated balance available June 30, 1937_..........                                                                                 120, 226. 81
Amount allotted during July 1937-------------___---------                                                                                3, 785, 000. 00
           Balance available for fiscal year 1938_- -                                                 _____--3,                              905, 226. 81
Amount (estimated) required to be appropriated for comple-
                            - - - - - - -- - - - - - - - - - - - - - - - - - - - - - -
tion of existing project                                                                                                                6, 014, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work a - - - - - -   -- - - - - - - - - - - - - - - - - - - - - - - - - - - -                                      -
                                                                                                                                      2, 219, 000. 00
   For maintenance 2_ - - - - - __ - -             -          -
                                                            ___     - -
                                                                                     __                                                  344, 000. 00
            Total a---------------------                                                                                                 2, 563, 000. 00
    a Exclusive of available funds.

                                                          PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937----------------                                                                                   $6,138, 157. 30
Cost of maintenance to June 30, 1937__

      Total cost of permanent work to June 30, 1937__----                                                                                6, 138, 157. 30
Net total expenditures           ________________6,                                                                                         138, 157. 30
                                                                                                                                         6______--
                                                  ---
      Total amount appropriated to June 30, 1937-__                                                                   __--6,                138, 157. 30

     Fiscal year ending June 30                           1933                 1934                 1935                    1936                   1937


Cost of new work--                        -.......
                                 --................
                                         _$1,       .                        451, 516. 15 $3, 951, 238. 04             $711, 744. 23         $23, 658.88
Cost of maintenance-----------.                -......     ---......                                               __
                                                                                                                   --------------    _---..--..-.
                                                                                                                                         __

Total expended.....-----------------------                                   970, 243.77     4, 044, 737. 21         1, 115, 122. 48                8, 053.84
Allotted.           .       .        .           ....-.                .4,   600, 000.00     1, 538, 157. 30..........................
                    RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                                                         67
Balance unexpended July 1, 1936                  ------------                                                                             $8, 053. 84
Gross amount expended ----      __-....________-    $13, 312. 22
Less reimbursements collected ------------------      5, 258. 38
                                                                                                                                             8, 053. 84
                                                EMERGENCY                  RELIEF FUNDS

Cost of new work to June 30, 1937 --------------------------                                                                        $4, 764, 096. 72
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937_-... __                                                                           4, 764, 096. 72
Undistributed costs June 30, 1937 -----------------------                                                                              ----   908. 36
      Net total cost to June 30, 1937------                                                                                           4, 765, 005. 08
Plus accounts receivable June 30, 1937 ------------                                                          _____
                                                                                                               -   --                         190. 70
      Gross total costs to June 30, 1937_                                           ________-           ___         -__-              4, 765, 195. 78
Minus accounts payable June 30, 1937__                                              ____-___-____-                             -           1, 812. 30
     Net total expenditures _ _________________________                                                                               4, 763, 383. 48
Unexpended balance June 30, 1937______-.. ______ ___ -                                                                     -           -   4, 666. 52
            Total amount appropriated to June 30, 1937_________                                                                       4. 768. 050. 00

     Fiscal year ending June 30                     1933                       1934                   1935                 1936                 1937


Cost of new work-----------------------..........
                                         .                           _$325,                             015. 95 $3, 675, 840. 36              $763, 240. 41
Cost of maintenance-----------
                         _                   .      ....--........
                                                       --             ------................--   ---------    ..-              ....      .
Total expended..........--......---...--...
                                        ------ -------------                                       325.000. 00       2, 991, 866.35          1, 446, 517. 13
Allotted .............           .........           ...--------------.....                      5,000,000. 00 --------------            -$231, 950.00


Balance unexpended July 1, 1936 ---------                                                                     __-__               $1, 683, 133. 65
Deductions on account of revocation of allotment-....                                                                      -...... 231,950.00
       Net amount to be accounted for-__- -    -      -__-------                                                                      1, 451, 183.65
Gross amount expended ______________       ___ $1, 459, 607. 56
Less :
    Reimbursements collected----- $12, 717. 87
    Receipts from sales ____ ____       372. 56
                                                    13, 090. 43
                                                                                                                                      1, 446, 517. 13
      Balance unexpended June 30, 1937-___ -                                                          ----                                   4, 666. 52
Outstanding liabilities June 30, 1937________-----                                                      -                  _                 4, 857. 22

     Balance available June 30, 1937-___---_-------_                                                                                    --       190. 70
Accounts receivable June 30, 1937_-- ___ ---------__190.                                                                                              70
        CONSOLIDATED COST AND FINANCIAL SUMMARY                                                   FOR CAPE COD CANAL, MASS.

Cost of new work to June 30, 1937.--------------------                                                                             $26, 131, 253. 17
Cost of maintenance to June 30, 1937 _________________ __                                                                           13, 998, 681. 34

      Total cost of permanent work to June 30, 1937 _.--                                                                    - 30, 129, 934. 51
Undistributed costs June 30, 1937------_____-    --
                                              ____       -__                                                               -__ -       908. 36

      Net total cost to June 30, 1937_ .. ____-._____- _                                                                            30, 130, 842. 87
Plus accounts receivable June 30, 1937---- ---------- ------                                                                              - 334.12

     Gross total costs to June 30, 1937 _______-_______---                                                                          30, 131, 176. 99
Minus accounts payable June 30, 1937 _____         ___-------                                                                           588,386. 66

     Net total expenditures ----------- ______ -- _______    129, 542, 790. 33
Unexpended balance June 30, 1937      ____-- -__------------- - 776, 412.18
            Total amount appropriated to June 30, 1937--                                                                           1 30, 319, 202. 51
   'Includes $1,658,354.71 from the permanent indefinite appropriation.
68             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


   Fiscal year ending June 30                   1933             1934              1935              1936               1937


Cost of new work ..............--.......------------...... $1, 451, 516. 15 $4, 276, 253. 99 $4, 395, 510. 46      $4, 507, 972. 57
Cost of maintenance-----------............. $528. 289. 93      370, 664. 43     813, 163. 35     350, 718. 60          314, 700.01

      Total cost.-.--------------            528, 289. 93   1, 822, 180. 58   5, 089, 417. 34   4, 746, 229. 06    4, 822, 672. 58

Total expended------------------             515, 462. 66   1, 314, 982. 71   5, 116, 652. 33   4, 436, 756.04     4, 939, 919. 18

Allotted.--------.-------------              875, 395. 39   4, 992, 693. 90   7, 135, 686. 06   3, 454, 822. 98       584, 050.00


Balance unexpended July 1, 1936-----------------------------                                                $5, 132, 281. 36
Amount allotted from War Department Appropriation Act
  approved May 15, 1936---------------------------------                                                          907, 000. 00
      Amount to be accounted for----------------------                                               -       6, 039, 281. 36
Deductions on account of revocation of allotment-----------                                                     322, 950. 00
      Net amount to be accounted for___                                                                      5, 716, 331. 36
Gross amount expended ___________    __-- -__    $4, 993, 924.92
Less:
    Reimbursements collected-   --  $53, 633. 18
    Receipts from sales__                372. 56
                                                      54, 005. 74
                                                                                                             4, 939, 919. 18
Balance unexpended June 30, 1937                                                                                  776, 412. 18
Outstanding liabilities June 30, 1937___________-                                     38, 351. 57
Amount covered by uncompleted contracts------                                        618, 167. 92
                                                                                                                  656, 519. 49
     Balance available June 30, 1937------------------                                                            119, 892. 69
Accounts receivable June 30, 1937 _                                                                                    334. 12
      Unobligated balance available June 30, 1937------------                                                     120, 226. 81
Amount allotted from War Department Civil Appropriation
  Act approved July 19, 1937-----------------------------                                                    3, 785, 000.00
         Balance available for fiscal year 1938------------------                                           3, 905, 226. 81
Amount (estimated) required to be appropriated for completion
   of existing project                1---        ----            --               -------                   6, 014, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1-----------------------------------------2, 219, 000. 00
   For maintenance 1-------     ____-___-___---__--_________ 344, 000. 00
         Total 1-------------------                                                                         2, 563, 000. 00
  1Exclusive        of available funds.

   16. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                          (GENERAL)

  The cost of work during the year amounted to $67,539.89; the
expenditures were $69,743.21. The balance unexpended June 30, 1937,
including accounts receivable, amounting to $16,630.15, together with
an allotment of $40,000 from the War Department Appropriation Act
of July 19, 1937, a total of $56,630.15, will be applied as needed during
the fiscal year 1938 to payment of expenses incurred under this head-
                RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                              69

ing. The additional sum of $50,000 can be profitably expended during
the fiscal year 1939.
                                        Cost and financial summary
Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937                     ------------------------                      $390, 882. 72
      Total cost of permanent work to June 30, 1937 _________ _ 390, 882. 72
Undistributed costs June 30, 1937-----------------------------1,     285. 16
      Net total cost to June 30, 1937_____________________------389, 597. 56
Plus accounts receivable June 30, 1937---------------------------     53. 51

     Gross total costs to June 30, 1937____-______-_-        __                                             389, 651.07
Minus accounts payable June 30, 1937 -------------------------                                                5, 073. 53
     Net total expenditures_ -------------------------------                                              384, 577. 54
Unexpended balance June 30, 1937-             -__________,                                                  16,576. 64
                                                                                                     ,------__
          Total amount appropriated to June 30, 1937 _______                            -      __-          401, 154. 18

          Fiscal year ending June 30              1933          1934           1935             1936             1937


C ost of n ew w ork . ....-- -- --- ---             9- 5        -                ----       --------------------
Cost of maintenance-------------------         $26, 927. 95 $20,394. 73     $31, 056.08      $88, 235. 90      $67,539.89
Total expended--.-----------------------..      28, 322. 56   13, 198. 65    34, 669.95       82, 512. 61       69, 743.21
Allotted-------------------------------         27, 385. 97   43, 868. 21    30, 000.00      115, 000. 00       28, 000. 00


Balance unexpended July 1, 1936_____--- __--------   _______--------        $58, 319. 85
Amount allotted from War Department Appropriation
  Act approved May 15, 1936 ______________--___ $27, 372. 01
Amount allotted from War Department Appropriation
Act approved Apr. 15, 1926_ .__..__---------      -- ___           627. 99
                                                                             28, 000. 00
       Amount to be accounted for         .---------------------------                                      86, 319. 85
Gross amount expended__-----------------                            $75, 511. 79
Less :
    Reimbursements collected__    ____-----         $5 724. 58
    Receipts from sales_ ___--  ____------                44. 00
                                                                       5, 768. 58
                                                                                                             69, 743. 21

      Balance unexpended June 30, 1937_ .-..      ___----------                                              16, 576. 64
Outstanding liabilities June 30, 1937__---------------------------                                            5, 538. 68

      Balance available June 30, 1937-----------      -------                                  ___           11, 037. 96
Accounts receivable June 30, 1937_-----  __----  ------------                                     _               53. 51

     Unobligated balance available June 30, 1937__--------___                                  ____         11, 091.47
Amount allotted during July, 1937-------    --------------------                                            40, 000. 00

          Balance available for fiscal year 1938---------------------                                       51, 091. 47

Amount that can be profitably expended in fiscal year - ending        June
                                                               ------ -----
                          - ---- ---- ------ -
30, 1939 for maintenance                      ----- - - - - -                                              50, 000. 00
   1 Exclusive of available funds.
70                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

17. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                           [Commercial statistics for these projects are given in pt. 2 of report]


                                                                                    For last      Cost and expenditures             Esti-
                                                                                     full re-        to June 30, 1937             mated
                              Name of project                                       port see                                     amount
                                                                                    Annual                                       required
                                                                                    Report       New work          Mainte-        to com-
                                                                                      for-                         nance            plete


1.   St. Croix River, Maine....---------------------------1924                                  $200, 441. 46    $6, 450. 19    (1)
2.   Lubec Channel, Maine. ____________--------------1912                                        303, 365. 53     4, 067. 45    (1)
3.   Bar Harbor, Maine 2           __.......__ __......... 1932
                              ___......                                                           406, 591. 12$ .........      $57, 900
4.   Union River, Maine 3 4_________________________________   1912                              176, 854. 85    14, 095. 15    (1)
5.   Deer Island Thoroughfare, Maine 3          _                -------
                                                                1910                               40, 000. 00 ............ (1)
6.   Belfast Harbor, Maine 3          ---------                1897                               61, 561. 45 ......   ___ __  (1)
7.   Camden Harbor, Maine 3 __- ---- __________            __. 1931                              102, 400. 00    30, 200. 00    (1)
8.   Rockland Harbor, Maine 2      ______ ___1931                                                915, 862. 73    24,637. 27     (1)
9.   Georges River (Thomaston Harbor), Maine 3-...... _ .      1935                               25, 787. 91    39, 566. 38    (1)
10.   Boothbay Harbor, Maine 3-.............._--------...       1915                                        00 ------------
                                                                                                   18,000. 000.                  (1)
11.   Portland Harbor, Maine 2           ---------              1936                             2,270,564.31    514, 984. 37  212, 000
12.   York Harbor, Maine 3-____..                . _.      ...  1936                               57, 400. 00     5, 660. 83    (1)
13. Portsmouth Harbor, N. H.3_----------
                          3-     -                                                     1892       130, 567. 11- .........           (1)
14.   Merrimack River, Mass.
                          3-
                                     ______        _______....__...             ...      1924     369, 891.  49     34, 575. 23   (1)
15.   Ipswich River, Mass. .....              ..
                                 _____________...                           ____.....    1895       5, 617.  91   ...- _____      (1)
16.   Rockport Harbor, Mass.___  .. 3 __..........__________                    __... 1905         91, 229.  25 -..........-      (1)
17.   Manchester Harbor, Mass.
                             3          ________________1908
                                      4.....                                                       23, 985.  57 ............ (1)
18.   Beverly Harbor, M ass.
                          3 - - _.._________________________
                                  - - - - - - - - - - - - - - - -            - - ___ - 1931      5246,047.76             642. 65  (1)
19.   Salem Harbor, Mass.6 _ - - - -           -      -        ___-        ___- _        1931     100, 456. 57        7, 500. 00  (1)
20.   Lynn Harbor, Mass. _                _______            ______
                                                                 -          _       _    1936     755, 042. 91      59, 707. 86  336, 000
21.   Malden River, Mass.7____
                             .       __________._:__-                   _     -- _       1922    8 104,853. 08      45, 096. 92   (1)
22.   Dorchester Bay and Neponset River, Mass.....                                 ..    1932       94, 584. 55     33, 591. 89  162, 000
23.   Weymouth Back River, 3Mass.--......................
                                     - - - - - - - - - - - - - - - - - - - - - - - - - - 1935       20, 478. 68       6, 521.32   40, 000
24.   Hingham Harbor, Mass.3             ___
                                         .         -                                     1913       28, 316. 58     10, 000. 00   (1)
25.   Duxbury Harbor, Mass. 34.........               .....          .......             1908       37, 000. 00 __...               5, 800
26.   Plymouth Harbor, Mass.           -2- - -         - - - - -             - -         1936    10377,217. 75 10134,035. 61      (1)
27.   Provincetown Harbor, Mass.               ..             ..            _____        1931     347, 453. 72           609. 00   13,300

  1 Completed.
  2 Improvement adequate for commerce.
  3 Channel adequate for commerce.
  4 Abandonment recommended in H. Doe. No. 467, 69th Cong., 1st sess.
  s Exclusive of $100,000 expended from contributed funds.
  6 Awaiting local cooperation.
  7 Under State maintenance.
   S Exclusive of $62,000 expended from contributed funds.
   9 $627.99 revoked fiscal year 1937.
  10Exclusive af $108,000 for new work and $400 for maintenance from contributed fund.

                            18. PLANT ALLOTMENT                    FOR BOSTON,             MASS., DISTRICT

                                               Cost and financial summary
Undistributed costs June 30, 1937__ -     ____ ____ -________- _ $442, 836.20
Plus accounts receivable June 30, 1937 ___________________---56, 940. 34

     Gross total costs to June 30, 1937 ___________________   _                                                           499, 776. 54
Minus accounts payable June 30, 1937 ------------------------
                                       ___                                                                                104, 031. 69
     Net total expenditures-________________________       -                                                              395, 744.85
Unexpended balance June 30, 1937_____    _________________--__                                                             58, 033.89
            Total amount appropriated to June 30, 1937________ __                                                    _ 453, 778. 74

            Fiscal year ending June 30                            1933             1934            1935            1936           1937

Total expended___--                              ...
                                  _____..........._                  ___$163, 520. 70
                                                  ____.......______......                                      $234,021. 06    -$1, 796. 91
Allotted .                   ..----------------------------------------------                   313, 781. 18    89,497. 56       50,500.00


Balance unexpended July 1, 1936,                                         -----                                                $5, 736. 98
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934- ------          ____ $1, 000. 00
Amount allotted from War Department Appropriation
Act approved Apr. 9, 1935--__- ----    _ ___      1,500. 00
          RIVERS AND HIARBORS-BOSTON, MASS., DISTRICT                          71
Amount allotted from War Department Appropriation
Act approved May 15, 1936--------------------$---48, 000. 00
                                                                     $50, 500. 00

       Amount to be accounted for-----------------------------        56, 236. 98
Gross amount expended---------------------------- $827, 988. 75
Less :
    Reimbursements collected------     $819, 443.45
    Receipts from sales--------------    10, 342. 21
                                                     829, 785. 66
                                                                     -1,   796. 91

      Balance unexpended June 30, 1937                                58, 033.89
Outstanding liabilities June 30, 1937---------------------------     104, 813. 75

     Balance available June 30, 1937--------------------            -- 46, 779. 86
Accounts receivable June 30, 1937-------------------  -----            56, 940.34

      Unobligated balance available June 30, 1937                      10, 160. 48
  19. NASHUA RIVER, AT FITCHBURG, MASS.-FLOOD PROTECTION

   Location.-Fitchburg,Mass., is located on the North Nashua River,
a. tributary of the Merrimack River, into which it flows at Nashua,
N. H.      (See U. S. Geological Survey Chart, Fitchburg, Mass.,
quadrangle.)
   Existing project.-Authorization for this project was provided by
allotment of funds appropriated by the Emergency Relief Appropria-
tion Act, approved June 22, 1936. It provides for deepening, widen-
ing, and straightening the channel through Fitchburg, and modify-
ing restricting structures to provide better hydraulic conditions of
flow and make a channel adequate to carry flood waters without flood-
ing adjacent properties. The estimated cost of the existing project is
$1,375,000, exclusive of land and other work to be provided by local
interests.
   Local cooperation.-The conditions under which the allocation of
funds was made required that local interests furnish without cost to
the United States all lands, easements, and rights-of-way necessary
to prosecute the work, protect the United States from all claims for
damages and for all liabilities due to the construction work, and
maintain and operate without expense to the United States all com-
pleted flood-control structures in accordance with regulations pre-
scribed by the Secretary of War. The city of Fitchburg, Mass.,
adopted the necessary resolution acceptirg these conditions on Octo-
ber 7, 1936, and the resolution was accepted by the Secretary of War
on December 31, 1936.
   Operations and results d uring fiscal year.-All work on this
project is being done by Government plant and hired labor. During
the fiscal year 1937, approximately 18,500 lineal feet of levees were
constructed, 1,500 lineal feet of retaining walls built, 20,000 square
yards of rip-rap laid, and miscellaneous alterations made to existing
bridges and other structures as required by the channel improve-
ment work. The costs during the fiscal year were $689,713.64 for
new work. The expenditures were $807,874.14.
   Condition at end of fiscal year.-The project is about 45 percent
completed. The cost has been $689,713.64 for new work. The
expenditures have been $807,874.14.
72              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-Thebalance unexpended, including accounts
receivable, at the end of the fiscal year, amounting to $1,014,109.41,
minus $275,000 revoked in July 1937, will be applied as follows:
Accounts payable June 30, 1937 ------------------------        $62, 833.08
New Work: Completion of construction of levees and channel
  improvements at Fitchburg, Worcester County, Mass., by hired
  labor and Government plant (July 1937-November 1937)----     676, 276. 33

           Total---------------------.                                      --          ---           ----                739, 109. 41
  No additional funds can be profitably expended during the fiscal
year 1939.
                                             Cost and financial summary
Cost of new work to June 30, 1937__________________________                                                              $689, 713. 64
Cost of maintenance to June 30, 1937______--_____-____                                                                   ------------
      Total cost of permanent work to June 30, 1937--_                                                          _-          89, 713. 64
                                                                                                                           6-----
Undistributed costs June 30, 1937 __---159,                                                                                      010. 03

      Net total cost to June 30, 1937____________________                                                                  848, 723.67
Plus accounts receivable June 30, 1937-----------------------                                                               21, 983. 55
Gross total costs to June 30, 1937 --------------------------                                                              870, 707. 22
Minus accounts payable June 30, 1937_________6___________                                                            -      62, 833. 0&
     Net total expenditures ----  ________________________                                                                807, 874. 14
Unexpended balance June 30, 1937 ____________--_______-                                                                   992, 125. 86
           Total amount appropriated to June 30, 1937 ____                                                   ____ 1, 800, 000. 00

           Fiscal year ending June 30                           1933             1934          1935              1936            1937


Cost of new work-----------------------....-----------------------------------$689,                                                713. 64
                  .........
Cost of maintenance----------                        -----------------------------------------------------
Total expended...-------------------.................------.................
                                                                    ------------------------                 -----------. 807, 874. 14
Allotted...           -------------------------------------------------------------                                          1,800,000. 00


Amount allotted from Emergency Relief Appropria-
  tion Act approved June 22, 1936             _____--------------------$1, 800, 000. 00
Gross amount expended ______-         ______-_____ $885, 953.45
Less reimbursements collected--- ------    __--___      78, 079. 31
                                                                           807, 874.14
      Balance unexpended June 30, 1937_----------        -   -______992, 125. 86
Outstanding liabilities June 30, 1937--------------------------234,      513. 09

     Balance available June 30, 1937_________       ___-___                                                                757, 612.77
Accounts receivable June 30, 1937 ---------------------------                                                               21, 983. 55

           Unobligated balance available June 30, 1937 -------------                                                       779, 596. 32

20. MERRIMACK RIVER, AT HAVERHILL, MASS.-FLOOD PROTECTION

   Location.-Haverhill, Mass., is located on the Merrimack River,
about 19 miles above the mouth of the river at Newburyport, Mass.
(See U. S. Geological Survey Chart, Haverhill, Mass., quadrangle).
  Existing project.-Authorization for this project was provided by
allotment of funds appropriated by the Emergency Relief Appro-
           RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                              73
priation Act, approved June 22, 1936. It provides for building a
sea wall on the north side of the Merrimack River extending about
2,300 feet upstream from the lower highway bridge at Haverhill,
and inclosing Little River from.its mouth up to the Pentucket Mill
Dam, a distance of 2,500 feet, the purpose being to protect the busi-
ness section of Haverhill from any but the most extreme floods. The
estimated cost of the existing project is $1,720,000, exclusive of land
and other work to be provided by local interests.
   Local cooperation.-The conditions under which the allocation of
funds was made required that local interests furnish without cost
to the United States all lands, easements, and rights-of-way neces-
sary to prosecute the work, protect the United States from all claims
for damages and for all liabilities due to the construction work, and
maintain and operate without expense to the United States all com-
pleted flood control structures in accordance with regulations pre-
scribed by the Secretary of War. The city of Haverhill, Mass.,
adopted the necessary resolutions accepting these conditions on Octo-
ber 13, 1936, and the resolution was accepted by the Secretary of
War on December 15, 1936. The easements are being obtained.
   Operations and results during fiscal year.-All work on the project
is being done by Government plant and hired labor. During the
fiscal year 1937 approximately 1,100 lineal feet of reinforced con-
crete sea wall were completed and 250 lineal feet of reinforced con-
crete conduit were partially completed. The cost was $778,708.13 for
new work. The expenditures were $765,539.99.
   Condition at end of fiscal year.-The project is approximately 40
percent completed. The cost has been $778,708.13 for new work.
The expenditures have been $765,539.99.
   Proposed operations.-Thebalance unexpended, including accounts
receivable, at the end of the fiscal year, amounting to $257,404.03,
together with an additional allotment in July 1937, of $275,000,
will be applied as follows:
Accounts payable June 30, 1937-----------------------------               $74, 279. 86
New work: Continuation of construction of the sea wall along the
Merrimack River and the construction of the Little River conduit,
  by hired labor and Government plant (July 1, 1937-January
1938) --------------------        ----------------------------           458, 124. 17

      Total------------------           --------------------------         532, 404. 03
   The present allotment is insufficient to complete the project. Addi-
tional funds in the amount of $650,000 can be profitably expended
during the year 1938 on construction of the main sea wall and Little
River conduit.
   No additional funds can be profitably expended during the fiscal
year 1939.
                            Cost and financial summary

Cost of new work to June 30, 1937 ______--------------                   $778, 708. 13
Cost of maintenance to June 30, 1937 -......                   ___.__

      Total cost of permanent work to June 30, 1937------                - 778, 708. 13
Undistributed costs June 30, 1987____ __ -- -----
                                               ____       --
                                                        ____                58, 167. 70

       Net total cost to June 30, 1937 ----          _____----------__    836, 875. 83
74                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Plus accounts receivable June 30, 1937------------------------                                                                        $2, 944.02

     Gross total costs to June 30, 1937--_ ------------------                                                                        839, 819.85
Minus accounts payable June 30, 1937------------------------                                                                          74, 279.86

     Net total expenditures-------------------------------                                                                          765, 539. 99
Unexpended balance June 30, 1937 -------------------------                                                                          254, 460. 01

             Total amount appropriated to June 30, 1937                                                                          , 020, 000. 00
                                                                                                                                1-------------

             Fiscal year ending June 30                              1933              1934              1935              1936               1937


Cost of new work..........--------------------.............                 .......................--------------------                      $778, 708.13
                                                                                                                           .........-----------.
'Cost of maintenance ------.....----... --------------                                --------- -                      ----------------------
             .............----............-----------------------------------
Total expended---------------                                                                                                              765, 539.99

Allotted ............................----------------------------------               ---         ------------ -------- 1, 020, 000. 00


Amount allotted from Emergency Relief Appropriation Act ap-
   proved June 22, 1936--------------------------------               $1, 020, 000. 00
'Gross amount expended----- -------                     $803, 312. 19
Less reimbursements collected                            37, 772. 20
                                                                          765, 539. 99
      Balance unexpended June 30, 1937----------------------254, 460. 01
Outstanding liabilities June 30, 1937-------------------------216, 715. 63

      Balance available June 30, 1937-------------------------                                                                         37, 744. 38
Accounts receivable June 30, 1937-----------------------------                                                                          2, 944. 02

             Unobligated balance available June 30, 1937--------------                                                                40, 688. 40

    21. MERRIMACK RIVER, AT LOWELL, MASS.-FLOOD PROTECTION

   Location.-Lowell, Mass., is located on the Merrimack River, about
40 miles above the mouth of the river at Newburyport, Mass. (See
U. S. Geological Survey Chart, Lowell, Mass., quadrangle.)
   Existing project.-Authorization for this project was provided
by allotment of funds appropriated by the Emergency Relief Appro-
priation Act, approved April 8, 1935. It provides for enlarging the
available waterway under and immediately above and below the
Pawtucket Bridge, a multiple arch concrete highway bridge, to pro-
vide adequate channel capacity for flood discharge and to restore the
hydraulic control of the reach to the crest of Pawtucket Dam rather
than the bridge; to lower the channel at Hunt's Falls, near the lower
limits of the city; to provide adequate channel capacity to discharge
flood at lower water levels upstream; and for removal of natural
channel constrictions between Pawtucket Falls and Hunt's Falls.
The estimated cost of the existing project is $721,000, exclusive of
land and other work to be provided by local interests.
   Local cooperation.-The conditions under which the allocation of
funds was made required that local interests furnish without cost to
the United States all lands, easements, and rights-of-way necessary
to prosecute the work, protect the United States from all claims for
                     RIVERS AND HARBORS-BOSTON, MASS., DISTRICT                                                                                 75
damages and for all liabilities due to the construction work, and main-
tain and operate without expense to the United States all completed
flood control structures in accordance with regulations prescribed by
the Secretary of War. The city of Lowell, Mass., adopted the neces-
sary resolution accepting these conditions on December 2, 1936, and
the resolution was accepted by the Secretary of War on January 16,.
1937.
   Operations and results during fiscal year.-All work on the proj-
ect is being done by Government plant and hired labor. During the
year 76,284 cubic yards of rock and earth were removed from the
Merrimack River channel. The costs during the year were $200,-
309.29 for new work. The expenditures were $205,142.99.
   Condition at end of fiscal year.-The project is approximately 28
percent completed. The costs have been $200,309.29 for new work.
The expenditures have been $205,142.99.
   Proposed operations.--The balance unexpended, including ac-
counts receivable, at the end of the fiscal year, amounting to $317,-
542.29, will be applied as follows:
Accounts payable June 30, 1937__----------------------------                                                                     $10, 437. 28
New work: Continuation of excavation at critical sections in the
  Merrimack River through Lowell, Mass., by hired labor and
  Government plant (July 1937-October 1937) -------- ____-                                                                       307, 105.01'
               Total                    ---------------------------------------                                                  317, 542. 291
  No additional funds can be profitably expended during the fiscal
year 1939.
                                                       Cost and financial summary
Cost of new work to June 30, 1937                                                                                                    309. 2
                                                                                                                                 $---------------------
Cost of maintenance to June 30, 1937--------------------------------
      Total cost of permanent work to June 30, 1937_                                                                             200, 309. 29
Undistributed costs June 30, 1937  -------------------------                                                                      13, 585.70,
      Net total cost to June 30, 1937----                                                  -----------------            __       213, 894. 99
Plus accounts receivable June 30, 1937                                                                                              , 685. 28
                                                                                                                                   1-------------------------
     Gross total costs to June 30, 1937---------------------                                                                     215, 580.27
Minus accounts payable June 30, 1937                                                                                              10, 437. 28"
                                                                                                                                  1---------------------
     Net total expenditures .....-                                                                                               205, 142.99,
Unexpended balance June 30, 1937--_                                                                                              315, 857. 01
             Total amount appropriated to June 30, 1937--------------                                                            521, 000. 00

             Fiscal year ending June 30                                1933               1934                 1935       1936           1937

Cost of new work....-- -------------.-------------------------------                                                   ---------. $200, 309. 29
Cost of maintenance._.........-              -.--------.......                        ..
                                                                   ------------ ---------                       ..    ......... ....
Total expended---------................---------                 -----------------------------------------                             205, 142. 99
Allotted...............................--------------------   .. -----------------------------------------                             521,000. 00
76        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from Emergency Relief Appropriation Act, ap-
  proved Apr. 8, 1935-    -----------------------------------                  $521, 000. 00
Gross amount expended_       ____        ________          -__   $220,901.27
Less reimbursements collected _______-____-__                 __   15, 758. 28
                                                                                205, 142.99

      Balance unexpended June 30, 1937----------------------                   315, 857. 01
Outstanding liabilities June 30, 1937_______________________                    41, 487. 43
     Balance available June 30, 1937----------------------                     274, 369. 58
Accounts receivable June 30, 1937__ 1 1   __     ______111111                    1, 685. 28

       Unobligated balance available June 30, 1937--           ---------       276, 054.86

     22. MERRIMACK RIVER, N. H. AND MASS.-FLOOD CONTROL

   Location.-The works covered by this project are a series of dams
and reservoirs on the Merrimack River and its tributaries in New
Hampshire and Massachusetts within a radius of 120 miles from
Boston.
   Existing project.-The Flood Control Act approved June 22, 1936,
authorized the construction of a system of flood-control reservoirs in
the Merrimack River Basin for the reduction of flood heights in the
Merrimack Valley generally, at an estimated cost (revised in 1937) of
$8,267,000.00 for construction and $3,500,000 for lands and damages.
   Local cooperation.-(See p. 6.) Legislation has been enacted by
the States of New Hampshire and Massachusetts creating the Merri-
mack River Valley Flood Control Commission, with power and
authority to acquire and hold lands, easements, and rights-of-way
for reservoirs; to hold, maintain, and operate reservoirs; and to
receive funds from the signatory States for these purposes. The
legislation also provides assurances for funds for an initial plan of
two reservoirs, Franklin Falls and Blackwater.
   Operations and results during fiscal year.-Field surveys, founda-
tion investigations, and design for the system of reservoirs were
carried on with funds allotted from the Emergency Relief Appropri-
ation Act of 1936. These items of work are about 90 percent com-
plete for the first reservoir (Franklin Falls) and are about 50 percent
complete for the entire initial project of three reservoirs.
   Condition at end of fiscal year.-Construction work has not been
started. The cost of field surveys, foundation investigations, and
design was defrayed from the Emergency Relief appropriation, "As-
sistance for educational, professional, and clerical persons, 1936-37."
   Proposed operations.-The sum of $207,000, allotted during Sep-
tember 1937, will be applied to engineering studies and surveys.
   No additional funds can be expended during the fiscal year 1939,
due to nonfulfillment of conditions of local cooperation.
                             Cost and flnancial summary

Cost of new work to June 30, 1937                                            ------
Cost of maintenance to June 30, 1937          _____

      Net total expendituresl_       _--                                         --
Total amount appropriated to June 30, 1937....................                 ---.
Amount allotted during September 1937----                  -----------         $207, 000. 00
                                          ...
Amount available for fiscal year 1938--------                    207, 000. 00
Amount (estimated) required to be appropriated for completion
of existing project ----------------------      ----         8, 267, 000. 00
                 RIVERS AND HARBORS-BOSTON,                                                    MASS., DISTRICT                                        77
Status of reports called for by river and harbor acts and committee resolutions

                                                                 Date trans-                                                                 Recommenda-
          Locality                Authorization Act              mitted to                              Document no.                         R    ion
                                                                  Congress

Androscogin     River,          Flood Control Com-           .........                   ".....
Maine (flood control).           mittee resolution,
                                  Mar. 27, 1936.
     Do_.---------------        Senate committee res-
                                  olution, Mar. 28,
                                  1936.
Androscoggin             River, Flood Control Act,
   Maine and N. H. (pre-          June 25, 1936.
   liminary examination
   for flood control).
Bagaduce River, Maine_ River and Harbor Act, Nov. 7,1936                                                         Unfavorable.
                                         Aug. 30, 1935.
Bar Harbor, Maine..... Rivers and Harbors
                                         Committee resolu-
                                         tion, Apr. 1, 1935.
     Do.....---........----------     River and Harbor Act,
                                         Aug. 30, 1935.                                      -.-------...............

Boston Harbor, Mass-._ River and Harbor Act,
                                         Aug. 26, 1937.
     Do-....------------              Rivers and Harbors                                     ------------------------



                                         Committee resolu- Nov. 7,1936
                                         tion, June 18, 1937.
Boston Harbor, Mass., River and Harbor Act,                                                                         Do.
   Winthrop and East                     Aug. 30, 1935.
   Boston.
Chandlers River, Maine_ .....              do...............------------June 22,1937                                Do.
Chelsea River or Creek, Rivers and Harbors Mar. 25, 1937                                      Rivers            Favorable.
                                                                                                                 and-     Harbors

   Mass.                                 Committee resolu-                                          Committee,              24,       75th

                                         tion, Jan. 14, .                                           Cong.,         1st   sess.

Cranberry Island Har- River and Harbor Act,
   bor, Maine.                           Aug. 30, 1935.
Eastport Harbor, Maine .... do--.                      .......--------- May 25, 1937                             Unfavorable.
                                                                                              ..--.........-..-..-.-.

Frenchboro Harbor, ....                    do...------------............Apr. 2,1937                                 Do.
                                                                                             ------..................

   Maine.                                                                            ........................
Hendricks Harbor, Senate committee res-
   Southport, Maine.                     olution, Aug. 17,
                                         1937.
Ipswich River, Mass.... River and Harbor Act,
                                         Aug. 26, 1937.
       Do         .                     Rivers and Harbors
                              ..------------.
                                         Committee resolu-                           ------------------------
                                         tion, June 3, 1937.
Isle au Haut Thorough- River and Harbor Act, Nov. 19, 1936                                                          Do.
   fare, Maine.                          Aug. 30, 1935.                               ........................
Isle au Haut to Kimball Rivers and Harbors ---.....                        do---.....--                             Do.
   Island, Maine, water-                 Committee resolu-                            ........................
   way.                                  tion, Apr. 30, 1935.
Kennebec River, Maine, Flood Control Act, ...............
   and tributaries (pre-                 June 20, 1936.
   liminary examination                                                               ........................
   for flood control).
.Kennebec River, Maine, Senate committee res- ...............
   (flood control).                      olution, Mar. 28,                              .............. ........-
                                         1936.
Merrimack River, N. H. Flood Control Com- .. . ..........
   and Mass. (flood con-                 mittee resolution,
   trol).                                Mar. 27, 1936.
iMerrimack River, Mass., Rivers and Harbors . .. .......... .......................-
   between Haverhill and                 Committee resolu-
    Newburyport.                         tion, Feb. 17, 1937.
Merrimack      River,     Mass.,       River   and Harbor Act, .... ..........                .............               .........

   to Hampton Harbor,                    Aug. 26, 1937.
   N.      H.,         inland
   waterway via Black
   Rock Creek, Mass.,
   and Blackwater River,
   Mass. and N. H.
Monhegan Harbor, River and Harbor Act, Dec. 12,1936                                                                 Do.
   Maine.                                Aug. 30, 1935.
Mystic River, Mass..... Rivers and Harbors -------- --"~~---------------
                                         Committee resolu-
                                                                           ~---I-----
                                         tion, Jan. 4, 1937. -.-............-...-....................



Nantasket (Hull) Gut, River and Harbor Act,
   Mass.                                 Aug. 26, 1937.
78            REPORT OF CHIEF OF ENGINEERS, LD. S. ARMY, 1937

Status of reports called for by river and harboracts and committee resolutions-
                                    Continued

                                                             Date trans-                                                                      Recommenda-
        Locality                 Authorization Act            mitted to                       Document no.
                                                              Congress                                                                            tion
                                                                           i                                                              i
                            i                            i




Newburypoi t     Harbor,        Rivers and Harbors
Mass.                            Committee resolu-
                                  tion, Feb. 12, 1937.
Northeast Harbor,               River and Harbor Act,
Maine.                           Aug. 26, 1937.
Ogunquit-Perkins Cove,          River and Harbor Act,
Maine.                           Aug. 30, 1935.
Penobscot River,                Flood Control Act,
Maine, and tribu-                June 25, 1936.
taries (preliminary
examination for flood
control).
Penobscot River,                Senate committee
Maine (flood control).          resolution, Mar. 28,
                                  1936.
Plum Island and Parker          River and Harbor
  Rivers, Mass.                  Act, Aug. 30,1935.
Plymouth Harbor,                Rivers and Harbors
Mass.                            Committee resolu-
                                 tion, Oct. 22, 1936.
Portland      Harbor,           River and Harbor
  Maine, north of House          Act, Aug. 26, 1937.
  Island, advisability of
  removing shoal.
Presumpscot River,                 do....
                                ...--
  Maine.
Rockland Harbor,                       Rivers and Harbors June 21, 1937_                                                                      Unfavor able.
  Maine.                                Committee resolu-
                                        tion, June 3, 1935.
Royal River, Maine ....               Rivers and Harbors
                                        Committee resolu-
                                        tion, Feb. 17, 1937.
Saco River, Maine,                    Flood Control Com-                     ..........      -
                                                                                           -.........
  (flood control).                      mittee resolution,
                                        Mar. 27, 1936.
     Do_ .             ___----------- Senate committee
                                        resolution, Mar. 28,                   - -.   .   .   .   .       . . .
                                                                                                      - --..      .   .   .   .   .   -

                                        1936.
St. Croix River, Maine__ River and Harbor                    Jan. 11, 1937__                                                                      Do.
                                        Act, Aug. 30, 1935.
Salmon Falls, Maine,                  Flood Control Com-
  and N. H. (flood con-                 mitteere solution,
  trol).                                Mar. 27, 1936.
Sandy Bay, Cape Ann,                  Rivers and Harbors
  Mass., harbor of ref-                 Committee resolu-
  uge.                                  tion, Feb 12, 1937.
Saugus River, Mass ...                River and Harbor
                                        Act, Aug. 26, 1937. --..-.....---.-
     Do......-------------            Senat ecommittee
                                        resolution, June 3,
                                        1937.
Scituate Harbor, Mass_. Rivers and Harbors                   Apr. 1, 1937. _ Rivers and Harbors                                               Favorable.
                                        Committee resolu-                          Committee, 26, 75th
                                        tion, Mar. 20, 1936.                       Cong., 1st sess.
     Do ....              ..          Rivers and Harbors
                                        Committee resolu-
                                        tion, May 18, 1937.
     Do...............                River and Harbor
                                        Act, Aug. 26, 1937.
Stonington Harbor,                    River and Harbor       Jan. 22, 1937_.                                                                  Unfavorable.
   Maine.                               Act, Aug. 30, 1935.
Swampscott, Mass.,                    River and Harbor
   harbor of refuge.                    Act, Aug. 26, 1937.  Dec. 11, 1936_.
Town River, Quincy,                   River and Harbor                         House, 96, 75th Cong.,                                         Favorable.
   Mass.                                Act, Aug. 30, 1935.                         Ist sess.
Wellfleet Harbor, Mass__ River and Harbor
                                        Act, Aug. 26, 1937.
         RIVERS AND HARBORS-PROVIDENCE,                     R. I., DISTRICT          79
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          PROVIDENCE, R. I., DISTRICT
  This district includes a part of the State of Massachusetts, com-
prising the southern coast line, extending as far north as Chatham
Harbor on the east coast line of Cape Cod, and the whole of the
States of Rhode Island and Connecticut, including the Connecticut
River, Conn., and Mass.
  District engineer: Lt. Col. Mason J. Young, Corps of Engineers.
  Division engineer: Col. E. D. Peek, Corps of Engineers.
                                        IMPROVEMENTS
                                         Page                                       Page
  1. Pollock Rip Shoals, Nan-                 27. Stamford Harbor, Conn _- -         124
       tucket Sound, Mass-                 79 28. Greenwich Harbor, Conn___.         127
  2. Chatham (Stage)          Harbor,         29. Examinations, surveys, and
      Mass-----------------                81       contingencies (general) __-     125
  3. Harbor of refuge at Nan-                 30. Other projects for which no
       tucket, Mass------_---              82       estimates are submitted___      129
  4. Hyannis Harbor, Mass .....            84 31. Plant allotment_ _      ----      129
  5. Cross Rip Shoals, Nantucket              32. onnecticut     River  Basin,
       Sound, Mass-----------___           85       flood control __......
                                           86                                        130
  6. Edgartown Harbor, Mass___
  7. Vineyard     Haven       Harbor,
      Mass-------------------              87              RELIEF' PROJECTS
  8. New Bedford and Fairhaven
       Harbor, Mass -__--------            88   33. Connecticut River at Hadley,
  9. Cuttyhunk Harbor, Mass .--            01        Mass., bank protection ___      131
10. Fall River Harbor, Mass__-             92   34. Connecticut River at Hadley,
11. Taunton River, Mass --- __--           94        Mass, levee construction___     132
12. Newport Harbor, R. I_____      -       95   35. Connecticut River at Hat-
13. Providence River and Har-                        field, Hampshire County,
       bor, R. I___--------------          96        Mass., levee construction
14. Pawtucket (Seekonk) River,                       and repairs________             133
       R. I--------------------            98   36. Connecticut River at Hat-
15. Harbor of refuge at Block                        field, Hampshire County,
        Island, R. I___-_------_--        100         Mass., new levee construc-
16. New London Harbor, Conn_              102        tion ____----                   133
 .7. Thames River, Conn___....            103
18. Connecticut      River      below           37. Connecticut River at West
       Hartford, Conn____------           105         Springfield, Hampden
19. Duck Island Harbor, Conn__            108         County, Mass., bank pro-
20. Branford Harbor, Conn____             109        tection _______                 134
21. New Haven Harbor, Conn__              111   38. Connecticut River at Spring-
22. Milford Harbor, Conn ___..            113         field and West Springfield,
23. Housatonic River, Conn ....           115         Hampden County, Mass.,
24. Bridgeport Harbor, Conn__             117        raising levees_                 135
25. Norwalk Harbor, Conn.____             121   39. Connecticut River at the city
26. Fivemile River Harbor,                            of Hartford, raising and
       Conn _.._-..._ ._..- _             122        extending levees __...          137

         1. POLLOCK RIP SHOALS, NANTUCKET                     SOUND, MASS.

  Location.-Pollock Rip Channel is the northerly passage through
the shoals off the eastern entrance to Nantucket Sound connecting
the deep water of the sound with that of the ocean. It is about 26
miles east from the harbor of Vineyard Haven, on the island of
Marthas Vineyard, Mass., and 60 miles south, from Provincetown

       20196-37-pt. 1-- 6
80      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Harbor, at the northern extremity of Cape Cod. (See U. S. Coast
and Geodetic Survey Chart No. 250.)
   Existing project.-This provides for dredging through the shoals
at the eastern entrance to Nantucket Sound with a Government
dredge, which is to assist the natural agencies in obtaining such
depth and width as may be found practicable, but not exceeding a
depth of 30 feet at mean low water and a width of 1 mile. The
mean ranges of the tide are, respectively, about 3.7 feet at Monomoy
Point, the nearest land, and 6.7 feet at Chatham Light, about 9 miles
to the north of this point. The ranges of spring tides at these two
points are 4.4 and 7.9 feet. The ranges are largely affected by
direction and force of storms. The original expenditure authorized
for experimental work was $250,000, and later the operation of a
dredge was authorized at an estimated annual cost of $200,000. The
estimated cost, revised in 1928, of providing a channel of suitable
dimensions was $1,100,000 for new work and $30,000 for annual main-
tenance.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 536, 62d Cong., 2d sess.), and extended
by the act of July 27, 1916 (Rivers and Harbors Committee Doc.
No. 3, 64th Cong., 1st sess.). The latest map is published in the
Annual Report for 1915, page 2056.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Maintenance dredging
with the United States hopper dredge W. L. Marshall, in progress at
the beginning of the year, was completed on July 3, 1936, with the re-
moval during the period of 9,908 cubic yards, bin measurement, of
sand and gravel from Bearse Shoal at no. 6 buoy. The total cost was
$1,610.78, all for maintenance. The expenditures were $19,082.81.
    Condition at end of fiscal year.-The project is practically com-
pleted. The depths previously secured over the northern tongue of
the Stone Horse Shoal have been maintained and the bend in the
channel materially improved. A cut 2,000 feet wide has been dredged
through Bearse and Pollock Rip Shoals, in which the general depth
was 32 feet and over, and the least depth at the edges 30 feet. On
June 30, 1937, the controlling depths were about 33 feet in the cut at
the eastern end of the shoals and 30 feet at the extreme edges. The
encroachment of Bearse Shoal into the cut at buoy no. 6 was mate-
rially reduced. The costs and expenditures under the project have
been $1,083,504.41 for new work and $443.271.93 for maintenance, a
total of $1,526,776.34.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1937, amounting to $252.92, together with $50,000
allotted in July, to maintenance operations with a seagoing hopper
dredge, September to November 1937.
    The sum of $50,000 can be profitably expended during the fiscal
year 1939 for maintenance operations with a seagoing hopper dredge
for about 2 months during the spring of 1939.
             RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                                 81

                                  Cost and financial summary

Cost of new work to June 30, 1937_--------------------------                                      $1, 083, 504. 41
Cost of maintenance to June 30, 1937 _______----------------                                          443, 271.93

         Total cost of permanent work to June 30, 1937---------1, 526, 776. 34

Net total expenditures----  ----------------------------                                              1, 526, 776. 34
Unexpended balance June 30, 1937----------           -----                                                    252.92

         Total amount appropriated to June 30, 1937 ---------                                         1, 527, 029. 26

         Fiscal year ending June 30            1933           1934             1935          1936                    1937


                                - . .-.
Cost of new work ........... ..-.-           __    .       -   ..          -.......-             ..    ..-     . .     .. .
Cost of maintenance-------.------------$40, 300. 06        $50, 791. 56    $45, 243. 07   $61, 253. 98          $1, 610. 78
Total expended.....-----------------------   38, 620. 99    46, 299. 73     24, 584. 27    69, 772. 28          19,082. 81

Allotted.-- --   -------------------------   49, 672. 65    85, 954. 60     50, 000. 00    10, 000. 00..........


Balance unexpended July 1, 1936------------------------------                                           $19, 335. 73
Gross amount expended _____________-_                                -        $19, 151. 92
Less reimbursements collected                                                          69. 11
                                                                          __------------------
                                                                                                             19, 082. 81
     Balance unexpended June 30, 1937----- --------                                                             252.92
Amount allotted from War Department Civil Appropriation Act,
approved July 19, 1937-----------------------------------                                                   50, 000. 00
      Balance available for fiscal year 1938-----------------                                                50, 252. 92
Amount that can be profitably expended in fiscal year ending June
30, 1939 for maintenance 1-------------------------                                                         50, 000. 00
   1 Exclusive of available funds.

                        2. CHATHAM (STAGE) HARBOR, MASS.

    Location.-At the northeastern corner of Nantucket Sound.                                                         It is
about 15 miles east of Hyannis Harbor, Mass., and 30 miles south of
Provincetown Harbor at the northern extremity of Cape Cod (see
U. S. Coast and Geodetic Survey Chart No. 1209).
  Existing project.-This provides for a channel 6 feet deep at mean
low water through the bars at the entrance to the harbor, 200 feet wide
at the outer bar, 150 feet wide at the middle bar and 100 feet wide at
the inner bar. The mean tidal range is about 3.9 feet and the maxi-
mum range, due to the combined effects of wind and other causes,
about 7 feet.
  The estimate of cost for new work, revised in 1897, was $13,732.39.
There is no approved estimate for annual cost of maintenance.
  The existing project was authorized by the River and Harbor Act
of September 19, 1890 (Annual Report for 1889, p. 599). There is no
published map.
  Terminal facilities.-There are two commercial wharves on the
north side of the inner harbor. The facilities are considered adequate
for the existing commerce.
  Operations and results during fiscal year.-Maintenance dredging
under contract was commenced October 27, 1936, and completed No-
82            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

vember 19, 1936. The three bars at the entrance were restored by the
removal of 38,812 cubic yards of sand, the material being pumped
ashore. The costs and expenditures for this dredging were $19,400,
applied to maintenance.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1901 at a saving of $5,843 under the estimated cost. The
controlling depth on June 30, 1937, was over 6 feet at mean low water.
The costs and expenditures have been $7,888.95 for new work and
$23,682.41 for maintenance, a total of $31,571.36.
  Proposed operations.-No funds are available and no operations
are contemplated during the fiscal years 1938 or 1939.
                                         Cost and financial summary

Cost of new work to June 30, 1937-------------                 $7,888.95
Cost of maintenance to June 30, 1937-------------------------- 23,682. 41
      Total cost of permanent work to June 30, 1937--------------                                   31,571.36,
Net total expenditures.  -------------------------------------                                      31,571.36
Total amount appropriated to June 30, 1937---------                                                 31,571.36

         Fiscal year eniding June 30                    1933        1934        1935         1936       1937

Cost of new work.-- ----         ----
Cost of maintenance---           ------------      --------------------------------------------          $19,400
Total expended-....--..---------.-----                               --------                             19, 400

Allotted.-                                  ----           -                                              19, 401


Amount allotted from War Department Appropriation Act, approved
  May 15, 1936----    ------   -----------------------------    $23, 500. 00
Deductions on account of revocation of allotment----------------4, 100. 00
      Net amount to be accounted for-----------------------                                         19, 400. 00
Gross amount expended      ----------------------------------                                       19, 400. 00
                  3. HARBOR OF REFUGE AT NANTUCKET, MASS.

   Location.-On the north shore of Nantucket Island about 32 miles
east-southeast from Vineyard Haven, Mass. (See U. S. Coast and
Geodetic Survey Chart No. 343.)
   Previous projects.--Adopted by the River and Harbor Act of
March 2, 1829. The costs and expenditures under this project were
$45,834.75, for new work. For further details of the previous proj-
ect, see page 1747, Annual Report for 1915.
   Existing project.-This provides for a channel 15 feet deep at
mean low water, without prescribed width, through the bar at the
entrance and for converging jetties of riprap, 6,987 feet and 5,755
feet long on the east and west sides, respectively, of the entrance.
The mean range of the tide is 3.1 feet, and the maximum range due
to the combined effect of wind and other causes is 5 feet or more.
   The estimate of cost for new work, revised in 1931, is $522,500,
exclusive of amounts expended under previous project. The latest
 (1928) approved estimate for annual cost of maintenance is $10,000.
   The project was authorized by the following river and harbor acts:
The act of June 14, 1880, provided for the west jetty (H. Doc. No.
18, 46th Cong., 2d sess., and Annual Report for 1880, p. 423); act of
             RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                        83
August 5, 1886, provided for the east jetty (Annual Report for 1885,
p. 579) ; acts of March 3, 1905, and March 2, 1907, provided for dredg-
ing in the channel between the jetties, the estimate for which had
not been included in the 1885 estimate. For latest published map see
Annual Report for 1916, page 1912.
  Local cooperation.-None required by law. The Commonwealth
of Massachusetts and local interests have expended for dredging and
rock removal nearly $59,000.
   Terminal facilities.-These consist of four piers affording about
3,000 feet of berthing space. Facilities are considered adequate for
present commerce.
   Operations and results during fiscal year.-Repairs to the east
jetty under contract, in progress at the beginning of the year, were
completed July 3, 1936. During the period 321.3 tons of stone were
placed at the outer and inner ends of the jetty. The cost of this work
was $1,158.28, applied to maintenance. Maintenance dredging in
the entrance channel, by the U. S. hopper dredge Minquas, in prog-
ress at the close of the year, was suspended July 18, 1936, resumed
August 5, and completed August 25, 1936. During the periods, 32,568
cubic yards were removed from the outer shoal and 64,322 cubic yards
from the shoal off Brant Point, a total of 96,890 cubic yards, bin
measurement. The cost of this dredging was $15,767.82, applied to
maintenance. 'The total costs were $16,926.10, all for maintenance,
and the total expenditures were $40,329.01.
   Condition at end of fiscal year.-The project is about 87 percent
completed. The channel has been dredged to project depth with a
width of 300 feet, increased at the inner end, and to 12 feet for an
additional width of 150 feet. The jetties have been built to varying
height and cross section with a view to controlling and regulating
scour between them. The west jetty is in fair condition; the east
jetty is in good condition. On June 30, 1937, the controlling depth
at mean low water in the channel was nearly 17 feet. To complete the
project, the west jetty is to be extended about 800 feet and the height
of the east jetty raised if necessary. The costs and expenditures
under the existing project have been $456,482.25 for new work and
$271,648.53 for maintenance, a total of $728,130.78.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal years 1938 or 1939.
                                    Cost and financial summary

                                 ------------------------- $502, 317. 00
Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937 ----------------------- 71, 648. 53
      Total cost of permanent work to June 30, 1937_____________                                          773, 965. 53
Net total expenditures-----------------------------                                                       773, 965. 53
Total amount appropriated to June 30, 1937-----------   ----- __                                          773, 965. 53

           Fiscal year ending June 30                1933          1934            1935           1936         1937


Cost of new wor--------
                              -
Cost of maintenance ..........--                     -
                                 --------. ----. ..... -..--------        -   ----------   -   $62,.56. 60    $16,926.10

Total expended...--..------------------        ---          -------------         $277.46       38, 776. 23   40, 329. 01

Allotted    -------------------         ----                        ............114, 500. 00 ............
                                                ----------------------....                       -      -35, 117. 30
84       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936_
                               ----------------------               $75, 446. 31
Deductions on account of revocation of allotment----------------     35, 117. 30

      Net amount to be accounted for-   ------------------------     40, 329. 01
Gross amount expended--------     ----------------------------       40, 329. 01

Amount (estimated) required to be appropriated for completion of
existing project ---------------------------------------            66, 000. 00

                      4. HYANNIS HARBOR, MASS.

   Location.-On the south side of Cape Cod about 15 miles west of
Chatham, Mass., and 20 miles east-northeast of Vineyard Haven, on
the Island of Marthas Vineyard, Mass. (See U. S. Coast and Geo-
detic Survey Chart No. 247).
   Existing project.-This provides for a stone breakwater, 1170 feet
long, lying about 0.7 mile off-shore; and for dredging to depths of
151/2 feet at mean low water in the protected area behind the break-
water. The mean tidal range is about 3.3 feet, and the maximum
range due to the combined effect of wind and other causes is about
6 feet.
   The estimate of cost for new work, revised in 1899, was $171,243.20.
There is no approved estimate for annual cost of maintenance.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1827, provided for the breakwater
 (S. Doc. No. 32, 18th Cong., 2d sess.) ; act of July 11, 1871, made
final provision for present dimensions of the breakwater (H. Doc.
No. 63, 41st Cong., 2d sess.) ; and the act of August 5, 1886, provided
for dredging in the protected area behind the breakwater (H. Ex..
Doc. No. 96, 48th Cong., 2d sess.) For the latest published map see
Annual Report for 1903, p. 788.
   Terminal facilities.-None. The harbor is used for refuge only.
   Operationsand results during fiscal year.-The eastern end of the
breakwater was restored and reinforced, and 15 feet of the structure
repaired by contract, November 2 to November 5, 1936, inclusive
dates, using a total of 383.72 long tons of riprap. The costs and
expenditures were $2,662.61, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1906. The breakwater was completed in 1882, and the
dredging in 1906. The controlling depth at mean low water on
June 30, 1937, was from 12 to 20 feet in the protected area behind the
breakwater. The project works are in good condition. The costs
and expenditures have been $197,382.58 for new work and $27,067.78
for maintenance, a total of $224,450.36.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal years 1938 or 1939.
                        Cost and financial summary
Cost of new work to June 30, 1937-----------------------------     $197. 382. 58
Cost of maintenance to June 30, 1937--------------------------       27, 067. 78
      Total cost of permanent work to June 30, 1937------------     224, 450. 36
Net total expenditures-------------------------------------         224, 450. 36
Total amount appropriated to June 30, 1937___--                     224,450. 38
                    RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                                                   85


              Fiscal year ending June 30                                       1933                 1934         1935           1936          1937


Cost of new work..........--...-------------------------------------...............------------------------
Cost of maintenance-----....................--------------------------------------------------------------                                   $2, 662. 61

Total expended-----........................-----------           ----        ------           -----------------------------------             2,662.61

Allotted------------------...................---...............................--------------------...       ------------   ------------      2, 662. 61



Amount allotted from War Department Appropriation Act approved
  May 15, 1936---------------                 ----------------    $3, 100. 00
Deductions on account of revocation of allotment-----------------     437.39

      Net amount to be accounted for----                                                                 ----------------- ----            2,662.61
Gross amount expended_______-------------_ _---------                                                                                      2, 662. 61

                        5. CROSS RJP SHOALS, NANTUCKET SOUND, MASS.

   Location.-Nantucket Sound lies south of Cape Cod and north of
Nantucket and the eastern part of Marthas Vineyard Islands. Cross
Rip Shoals are a little southerly and easterly of the geographical
center of the sound. They are about 17 miles east from Vineyard
Haven on the island of Marthas Vineyard and about 15 miles north-
west from Nantucket Harbor. (See U. S. Coast and Geodetic Survey
Chart No. 1209.)
   Existing project.-This provides for a channel 4,000 feet wide and
30 feet deep at mean low water between Half Moon Shoal and Cross
Rip Shoal, about 1.7 miles. The mean tidal range is about 2 feet
and the maximum range, due to the combined effect of wind and other
causes, is 3 feet or more.
   The estimate of cost for new work, made in 1928, was $27,000. The
latest (1928) approved estimate for annual cost of maintenance is
$4,000. The existing project was authorized by the River and Harbor
Act of July 3, 1930 (H. Doc. No. 182, 70th Cong., 1st sess.). The
latest published map is in the project document.
   Terminal facilities.-None.
   Operations and results during fiscal year.-The U. S. hopper dredge
W. L. Marshall worked July 1 and 2, 1936, on maintenance dredging,
removing 23,075 cubic yards, bin measurement, of sand from the chan-
nel at Half Moon Shoal, completing the work. The costs were
$1,172.17, all for maintenance; no expenditures were made.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $2,800 under the estimated cost. The con-
trolling depths on June 30, 1937, were 30 feet at the edge of the
western shoals and over 31 feet through the sailing course, and on the
extreme edeoe of the eastern shoal, 28 feet. The costs and expenditures
have been
total of $48,837.20.
                          924,200.13 for new work and $24,637.07 for maintenance, a
   Proposed operations.--It is proposed to apply the sum of $6,000
allotted in July to maintenance operations on the shoals at the eastern
end of the channel with a sea-going hopper dredge during November
1937.
   The sum of $7,500 can be profitably expended during the fiscal year
1939 for maintenance operations with a sea-going hopper dredge for
about 10 days during the spring of 1939.
86           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                     Cost and financial summary
Cost of new work to June 30, 1937----- ----------------------  $24, 200. 13
Cost of maintenance to June 30, 1937--------------------------24, 637. 07
      Total cost of permanent work to June 30, 1937---------------                                                  8, 837. 20
Net total expenditures    -------------------------------------                                                    48, 837.20
Total amount appropriated to June 30, 1937---------------------                                                    48, 837. 20

        Fiscal year ending June 30                1933.            1934              1935              1936              1937

Cost of new work ..----------------
Cost of maintenance__            _
                                _____-
                                           - -       -
                                       _____ $10, 622. 01
                                                             -i------
                                                               $6, 667. 50
                                                                              ---                - -
                                                                                                     $4, 827. 83
                                                                                                                    I-$1, 172.17
Total expended----------------------_           9, 314. 83       6, 667. 50     $1, 347. 56           6, 000. 00-
Allotted-----..------------------------        14, 967. 20       5,522. 44          1, 347. 56   -

Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937     -------------------------------------      $6, 000. 00
Amount available for fiscal year 1938---------------------------6, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1                            _       .---- 7, 500. 00
   'Exclusive    of available funds.

                              6. EDGARTOWN HARBOR, MASS.

  Location.-Between Chappaquiddick and Marthas Vineyard Islands
at the southeastern end of the latter, about 201/2 miles southwest of
Hyannis Harbor, Mass. (See U. S. Coast and Geodetic Survey Chart
No. 346.)
  Previous projects.-Adopted by the acts of March 2, 1829, June 10,
1872, and September 19, 1890. The costs and expenditures under these
projects were $30,000 all for new work. For further details see page
183, Annual Report for 1874, part 2, and page 890, Annual Report
for 1897.
  Existing project.-This provides for a channel generally 150 feet
wide and 17 feet deep from Nantucket Sound into deep water of the
inner harbor, suitably widened at the bend inside the inner-harbor
entrance, together with the removal to a depth of 12 feet of the entire
Middle Ground Shoal and the outer portion of the shoal inside and
east of the entrance to the inner harbor. The plane of reference is
mean low water. The mean tidal range is 2 feet and the maximum
range due to the combined effects of wind and other causes is 5 feet or
more.
   The estimated cost for new work, made in 1936, is $21,175, including
$10,000 to be contributed by local interests but exclusive of amounts
expended on previous projects. The latest (1936) approved estimate
for annual cost of maintenance is $500.
   The existing project was adopted by the River and Harbor Act
approved August 26, 1937 (Senate Committee Print, 74th Cong., 2d
sess.), which document contains the latest published map.
   Local cooperation.--The project was adopted subject to the provi-
sions that local interests contribute $10,000 toward the cost of the
work, and furnish free of cost to the United States suitable areas for
the disposal of dredged material. Spoil areas are available and ar-
rangements have been completed to contribute the necessary funds.
          RIVERS AND HARBORS-PROVIDENCE,                              R. I., DISTRICT       87

  Terminal facilities.-These consist of a town wharf and one com-
mercial wharf, both open to public use, and numerous private landings
for pleasure boats. The facilities are ample for present traffic.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done. The con-
trolling depths at mean low water are: In the outer-harbor channel,
about 16     feet; on Middle Ground Shoal, 5 to 12 feet, and on the
inner-harbor shoals to be widened, 2/ to 17 feet.
  Proposed operations.-No funds are available and no operations are
contemplated during the fiscal year 1938.
  The sum of $11,175, together with $10,000 to be contributed by local
interests, can be profitably expended during the fiscal year 1939 by
contract in the completion of the project.
                               Cost and financial summary

Cost of new work to June 30, 1937 -----                      -----------------------    $30, 000
Cost of maintenance to June 30, 1937__ ...

      Total cost of permanent work to June 30, 1937      ------                          30, 000
Net total expenditures    ---------------------------------------                        30, 000
Total amount appropriated to June 30, 1937_     ____- _______--_30,                          000
Amount (estimated) required to be appropriated for completion of exist-
  ing project 1___                   ---------------------                               11, 175
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work 1- - - - - - -- - -- -- - -- - -- - -- -- - -- - - - - - - - -- -
                                                                                         11, 175
  1 In addition $10,000 is to be contributed by local interests.

                      7. VINEYARD HAVEN HARBOR, MASS.

   Location.-On the north shore of Marthas Vineyard Island at the
western end of Nantucket Sound, about 21 miles southeast of New
Bedford, Mass. (See U. S. Coast and Geodetic Survey Chart No.
347.)
   Previous projects.-Adopted by the River and Harbor Act of
August 11, 1888. The cost and expenditures prior to adoption of
the existing project in 1935, were $55,387.35 for new work. For
further details see page 82, Annual Report for 1909.
   Existing project.-This provides for dredging to a depth of 17
feet an area 150 to 275 feet wide north of the fairway between the
steamboat wharf and the State breakwater; and for dredging an
anchorage 12 feet deep, about 10 acres in area, behind the break-
water. All depths refer to mean low water, the mean tidal range
being about 1.7 feet. The extreme tidal range, due to wind and other
causes, is 4 feet or more.
   The estimate of cost for new work, made in 1935, is $30,000, with
$1,100 annually for maintenance.
   The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (Rivers and Harbors Committee Doc.
No. 65, 74th Cong., 1st sess.), which document contains the latest
published map.
   Local cooperation.--None required by law. The Commonwealth of
Massachusetts and local interests have expended about $100,000 for
dredging, breakwater, and jetty construction within the harbor.
88            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.-There are 7 piers in the upper harbor, one of
which is open to public use. The facilities are considered adequate
for the existing commerce.
    Operations and results during fiscal year.-Dredging under con-
tract for widening the fairway and providing an anchorage area
in the upper harbor was commenced October 27, 1936, and completed
February 15, 1937, completing the project. Under the contract a
total of 113,979 cubic yards was removed hydraulically and deposited
on adjacent marshy areas.         The costs and expenditures were
 $27,186.12, all for new work.
   Condition at end of fiscal year.-The project was completed in 1937
at a saving of $2,813 under the estimated cost. The controlling
depths in the fairway through the upper harbor are from 17 to 18
feet, and in the anchorage area about 13 feet. The costs and expendi-
tures have been $27,186.12, all for new work.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal years 1938 or 1939.
                                      Cost and financial summary

Cost of new work to June 30, 1937 --                                      --------
                                                                   ____-----                               $82, 573.47
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937__- ___-----                                                 82, 573.47
Net total expenditures_____________--___-- ----  _                                                              82, 573.47
      Total amount appropriated to June 30, 1937 ----------                                                     82, 573. 47

         Fiscal year ending June 30                 1933           1934          1935             1936              1937


Cost of new work.-------------------               ------            ....                               .....
                                                                                                ------------
                                                                              ..----------...------------         $27, 186. 12
Cost of maintenance-----...............---------....------....----------....------------....----------------------
Total expended------------------------------------..................---...-----------------------27,                  186. 12

Allotted---------.        -------          ------------------------------------------------                        27, 186. 12


Amount allotted from War Department Appropriation Act approved
May 15, 1936----       -- ---------------------------------     $32, 500. 00
Deductions on account of revocation of allotment----------------   5, 313. 88

      Net amount to be accounted for--        __---------------        --                                       27, 186. 12
Gross amount expended ______--_------------                     $27, 191.28
Less reimbursements collected -----------------------                  5. 16
                                                                                                                27, 186. 12

                8. NEW BEDFORD AND FAIRHAVEN HARBOR, MASS.

   Location.-New Bedford Harbor is a tidal estuary on the western
side of Buzzards Bay, about 21 miles northwesterly from the harbor
at Vineyard Haven, Mass., and about 42 miles to the eastward of
Point Judith Harbor, R. I. (See U. S. Coast and Geodetic Survey
Chart No. 252.)
   Previous projects.-Adopted by River and Harbor Acts of July 4,
1836, March 3, 1875, and August 11, 1888. The costs and expendi-
tures under these projects prior to the adoption of the existing project
in 1907 were $170,700 for new work. For furthei details see page
1748, Annual Report of 1915.
        RIVERS AND HARBORS-PROVIDENCE,            R. I., DISTRICT     89
    Existing project.-This provides for a channel 30 feet deep and
350 feet wide from deep water in Buzzards Bay to a point just above
the New Bedford-Fairhaven Bridge, nearly 5 miles, with increased
widths for anchorage and maneuvering purposes in the area north--
west of Palmer Island and above the bridge; a channel 25 feet deep
between harbor lines along the New Bedford wharf front near the
bridge, about 0.2 mile; a channel 100 feet wide and 18 feet deep from
the 30-foot area north of Fish Island to Belleville, a distance of about
-2 miles, with a turning basin at the upper end 300 feet wide; dredging
the area west of a line 50 feet channelward of the Fairhaven Harbor
line to a depth of 15 feet over widths of 150 to 400 feet from Peirce &
Kilburn wharf to the Old South wharf, and thence 10 feet deep and
150 feet wide to a point 1,000 feet south of the old causeway pier, about
,0.7 mile; and for the maintenance of the 25-foot anchorage area east
of the channel and north of Palmer Island. The plane of reference is
mean low water, the mean range of the tide being 3.7 feet, and the
maximum range, due to the combined effect of wind and other causes,
7 feet or more.
    The estimated cost for new work, revised in 1937, is $1,700,000, in-
cluding $20,385 to be contributed by local interests but exclusive of
amounts expended on previous projects. The latest (1937) approved
oestimate for annual cost of maintenance is $23,250.
    The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for the 25-foot
anchorage area north of Palmer Island (H. Doc. No. 271, 59th Cong.,
2d sess.); the act of March 3, 1909, provided for extending the 25-
foot channel along the New Bedford wharf front near the bridge;
the act of July 25, 1912, provided for the 18-foot channel in Acush-
net River to Belleville (H. Doc. No. 442, 62d Cong., 2d sess.); the
.act of July 3, 1930, provided for the 30-foot channel, anchorage, and
maneuvering areas (H. Doc. No. 348, 71st Cong., 2d sess., except that
the width of the channel was limited to 350 feet, the limit of cost
being fixed at $718,000) ; the act of August 30, 1935, provided for the
present dimensions of the anchorage area northwest of Palmer
Island, the maintenance of the 25-foot anchorage, and elimination
from the project of the prior authorization for enlarging and deep-
tening the maneuvering area 30 feet deep east of the harbor channel;
4extension of the western maneuvering area was also authorized May
28, 1935, under the Emergency Relief Appropriation Act of 1935
  (Rivers and Harbors Committee Doc. No. 16, 74th Cong., 1st sess.);
and the act of August 26, 1937, provided for the 15-foot and 10-foot
channel along the Fairhaven wharf front (Rivers and Harbors Com-
mittee Doe. No. 25, 75th Cong., 1st sess.). For the latest published
maps see the three last-mentioned documents.
    Local cooperation.-The River and Harbor Act of July 25, 1912,
imposed the condition that local interests construct a new bridge at
Coggeshall Street with a draw opening of at least 100 feet and build
 :a substantial wharf upon the city property at Belleville, the name
:given to the northern part of the city. These conditions have not
been met, and there is no present prospect of their being complied
with.
90         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The River and Harbor Act of August 26, 1937, authorized the
channel along the Fairhaven water front subject to the condition
that local interests contribute 50 percent of the initial cost of the
improvement, but not to exceed $20,400. Arrangements to meet this
condition have been completed.
    The Commonwealth of Massachusetts expended approximately
 $118,000 in dredging a channel 25 feet deep from Fish Island nearly
to Coggeshall Street Bridge.
    Terminal facilities.-These consist of piers and wharves with a
total of about 18,500 feet of docking space. The facilities are con-
sidered adequate for the existing commerce. (For further details
see Port Series No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 88
percent completed. Under previous authorizations a 25-foot channel
along the New Bedford water front and an anchorage area east of
the channel have been completed. The entrance and harbor channel,
the channel through the bridge, and channel and the major part of
the turning basin above the bridge, have been dredged to 30 feet.
The extended western maneuvering area has been dredged to 30 feet
except for isolated ledge and boulder areas. The controlling depths
on June 30, 1937, were nearly 30 feet in the entrance channel, in the
channel through the harbor and bridge, and in the turning basin
above the bridge, 30 feet in the western maneuvering area below the
bridge except for isolated rocky shoals; in the Fairhaven water-front
channel, 7 to 14 feet in the 15-foot section and about 31/2 feet in the
10-foot section; and in the Acushnet River, about 23 feet to about
1,200 feet below the Coggeshall Street bridge and thence 7 feet to
Belleville. The head of navigation is about 7 miles north of the
entrance, opposite Sconticut Point. To complete the project requires
the completion of the turning basin above the bridge, the removal of
rocky shoals in the western maneuvering area, the dredging of the
Fairhaven water-front channel, and the dredging of the 18-foot chan-
nel up to Belleville. The costs and expenditures from regular funds
have been $1,213,752.79 for new work and $201,394.63 for mainte-
nance, a total of $1,415,147.42. The costs and expenditures from
Emergency Relief funds have been $226,537.63 for new work.
    The total costs and expenditures, all funds, were $1,440,290.42 for
new work and $201,394.63 for maintenance, a total of $1,641,685.05.
   Proposed operations.-No funds were available at the close of the
year. It is proposed to apply the sum of $75,000 allotted in Septem-
ber to removing, by contract, about 6,000 cubic yards of ledge and
boulders from the extensions to the western maneuvering area, to be
completed during the year.
    The sum of $80,385, together with $20,385 to be contributed by
local interests, can be profitably expended during the fiscal year 1939
as follows:
New work:
   Completing the turning basin above the New Bedford-Fairhaven
     bridge, by contract, about 140,000 cubic yards---------------- $60, 000
   Completing channel along the Fairhaven water front, by contract,
      about 151,000 cubic yards_________-_________________--------    40, 770
      Total________----   --    _____-        _ _.___-__--           100, 770
            RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                            91

                                      Cost and financial summary

Cost of new work to June 30, 1937--------------------------12 $1, 610, 990. 42
Cost of maintenance to June 30, 1937-----------------------       201, 394. 63
      Total cost of permanent work to June 30, 1937---------                                         1, 812, 385. 05
Net total expenditures ------------------------------------                                        121, 812, 385. 05
Total amount appropriated to June 30, 1937-----------------                                        121, 812, 385. 05

         Fiscal year ending June 30                   1933          1934          1935            1936             1937

Cost of new work...--...-----------------.
                                  ....     $90,942. 67 ......------------       $1, 752. 01   $473, 407. 65          $22. 05
Cost of maintenance---          ------------------------- $17, 321.80 ------------
Total expended.--.              .---------------------
                                                 98,005.01         9,784.43      2, 718.94    472, 440.72             22.05
Allotted.----.-------..----------------- 105, 301.68               -645. 19    413, 500.00      86, 144.08      -24, 462.37


Balance unexpended July 1, 1936 -------------------------                                                     $24, 484. 42
Deductions on account of revocation of allotment.....---------------.                                          24, 462. 37

      Net amount to be accounted for-------------------------                                                      22. 05
Gross amount expended_------------------------------ $24.46
Less reimbursements collected--------------------------  2.41
                                                                                                                   22. 05

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------                                                 75, 000. 00
Amount available for fiscal year 1938--------------------------                                               75, 000. 00
Amount (estimated) required to be appropriated for completion
                             -              - -         -      -                     - -         -
of existing project 3 4--_--_         ____         ___ __                                  _                 164, 395. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -            80,385. 00
   1Increased $22.05 to cover cost adjustment made in 1937 (Emergency Relief Admin-
istration funds).
   2 Includes $226,537.63 Emergency Relief funds.
   SExclusive of available funds.
   4In addition $20,385 to be contributed by local interests.

                                9. CUTTYHUNK HARBOR, MASS.

   Location.-At the eastern end of Cuttyhunk Island, at the western
entrance to Buzzards Bay, about 14 miles south of New Bedford
Harbor, Mass. (See U. S. Coast and Geodetic Survey Chart No. 297.)
   Existing project.-This provides for a channel generally 75 feet
wide and 10 feet deep from that depth in the outer harbor to the
westerly terminal in Cuttyhunk Pond, about 3,500 feet; an anchorage
in the inner harbor of the same depth, 900 feet long and 800 feet
wide; and for the maintenance of the existing jetties. The plane of
reference is mean low water. The mean range of tide is 3.4 feet, and
the maximum range, due to the combined effects of wind and other
causes, is 5 feet or more.
   The estimate of cost for new work, made in 1936, is $65,000, in-
cluding $19,500 to be contributed by local interests. The latest
 (1936) aPpproved estimate for annual cost of maintenance is $3,650.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 81, 75th Cong., 1st sess.). The
latest published map is in the project document.
   Local cooperation.-The project as authorized is subject to the pro-
visions that local interests contribute 30 percent of the first cost, but
92           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

not to exceed $19,500, and furnish, free of cost to the United States,.
suitable spoil-disposal areas for new work and subsequent mainte-
nance. Spoil areas are available and arrangements have been made
to contribute the required funds when necessary.
  Terminal facilities.-The town owns the two wharves located in the'
harbor. These have docking spaces aggregating 400 feet and are
open to the public without restriction. The facilities are ample for
present commerce.
   Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-Work on the existing project had
not begun. The controlling depths are about 10 feet (not full width)
in the channel through the entrance, thence about 6 feet to the west-
erly terminal, and in the anchorage from 0.2 to 10 feet, all as
determined in 1936. There have been no costs or expenditures under
the project.
  Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1938.
  The sum of $45,500, together with $19,500 to be contributed by
local interests can be profitably expended during the fiscal year 1939,
by contract, in the completion of the project.
                               Cost and financial summary
Cost of new work to June 30, 1937________---
Cost of maintenance to June 30, 1937

Net total expenditures
Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion of
  existing project    1----      --       -----                      ------        $45, 500.   00
Amount that can be profitably expended in fiscal year ending
                                    -- -- -- -- --
June 30, 1939, for new work 1- - -              ____- - - - - - - - - - - - - -   45, 500. 00
  1   In addition $19,500 is to be contributed by local interests.

                          10. FALL RIVER HARBOR, MASS.

   Location.-Situated at the mouth of Taunton River, on the east
side and at the head of Mount Hope Bay, which empties into the
ocean through Narragansett Bay and Sakonnet River. It is about
18 miles northerly from Newport Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 353.)
   Previous projects.-Adopted by River and Harbor acts of June
23, 1874, March 3,1899, June 13, 1902, and June 25, 1910. The cost
and expenditures were $330,204.16 for new work and $81,410.31 for
maintenance, a total of $411,614.47. For further details see page
1749 of Annual Report for 1915.
  Existing project.-This provides for a channel 30 feet deep at
mean low water and 400 feet wide through Mount Hope Bay and
Fall River Harbor, about 6.8 miles, with increased width opposite
the wharves below Slades Ferry bridge; for the removal of the
lower end of Hog Island Shoal, and for the maintenance of the
25-foot anchorage, about 42 acres in area, west of the harbor channel.
The mean tidal range is 4.9 feet and the maximum range, due to the
combined effect of wind and other causes, is 8 feet or more.
  The estimate of cost for new work, made in 1929, is $420,000,
exclusive of amounts expended on previous projects. The latest
         RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                                93
(1929) approved estimate for annual cost of maintenance is $11,000.
   The existing project was authorized by the River and Harbor
Act of July 3, 1930 (H. Doc. No. 158, 71st Cong., 2d sess.). The
latest published map is in the project document.
   Terminal facilities.-These consist of 17 piers having 12,000 feet
of docking space and wharves affording 7,000 feet additional docking
space. Three of the piers have direct railroad connection. The
facilities are considered adequate for the commerce of the port.
 (For further details see Port Series No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The project is about 90 percent
completed. Under a previous authorization an anchorage has been
'dredged  opposite the wharves. The channel has been dredged to
project dimensions up to Slades Ferry bridge, and the removal of
Hog Island Shoal about 52 percent completed. The controlling
depths at mean low water are: Entrance channel 30 feet to Globe
wharf, nearly 29 feet to Slades Ferry bridge; above the bridge 30
feet except at edges; anchorage area 18 to 25 feet, as determined in
1937; and on Hog Island Shoal 18 to 30 feet. To complete the work
requires the removal of the remainder of Hog Island Shoal and the
widening of the channel above the bridge. The total costs and
expenditures have been $378,535.02 for new work.
   Proposed operations.-No funds were available at the close of the
year. It is proposed to apply the sum of $18,000 allotted in Sep-
tember to improvement dredging by contract in the channel north of
Brightman Street bridge, to be completed during the year.
   The additional sum of $40,000 can be profitably expended during
the fiscal year 1939 for maintenance operations with a seagoing
hopper dredge in the channel north of Globe wharf.
                                  Cost and financial summary
Cost of new work to June 30, 1937----------------------------  $708, 739. 18
Cost of maintenance to June 30, 1937--------------------------81,    410. 31
      Total cost of permanent work to June 30, 1937------------790, 149. 49
Net total expenditures----------------------------------------   790,149. 49
Total amount appropriated to June 30, 1937 --------------------- 790, 149.49

       Fiscal year ending June 30            1933           1934                    1935              1936          1937


Cost of new work__.------------------     $96, 509. 28   $13,253.77                  $62. 16     .
Cost of m aintenance.- _.-
                       - - - - - - - - --.- --- --            ---             - --- -                - -- - -     -----
Total expended...------------------.--.    96, 763. 34    11, 460. 98                 62. 16-
Allotted.....------------------------     129, 668. 22 -29, 195. 36                   62. 16..


Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------_    $18, 000. 00
Amount available for fiscal year 1938--------------------------- 18, 000. 00
Amount (estimated) required to be appropriated for completion of
  existing    project --------------              --                    ---------              __               23, 500. 00
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance
1 Exclusive of available funds.
                                          1--------------
                                          -- ---------------- 40, 000. 00
94      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                    11. TAUNTON RIVER, MASS.

   Location.-Rises in Norfolk County, Mass., flows in a general
south by west direction about 44 miles, and empties into Mount
Hope Bay at Fall River.         (See U. S. Geological Survey sheets
Taunton and Fall River.)
   Previous projects.-Adopted by River and Harbor Acts of July
11, 1870, and June 14, 1880. The cost and expenditures prior to
the adoption of the existing project in 1930 were $171,497.93 for
new work and $32,831.26 for maintenance, a total of $204,329.19.
For further details see page 1748 of Annual Report for 1915.
   Existing project.-This provides for a channel 12 feet deep at
mean low water generally 100 feet wide up to a point about 2,800
feet below Weir Bridge; thence 80 feet wide for about 2,000 feet, and
thence 60 feet wide to the bridge.
   The mean tidal range is 4.9 feet at the mouth, 4.8 feet at Dightop,
and 4.2 feet at Weir Bridge. The maximum range, due to the com-
bined effects of wind and other causes, is 8 feet or more at the mouth
and at Dighton, and about 6 feet at the head of navigation.
   The estimate of cost for new work, made in 1930, is $780,000,
exclusive of amount expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $10,000,
including maintenance of the turning basin to be constructed by
local interests.
   The existing project was authorized by the River and Harbor
Act of July 3, 1930 (H. Doc. No. 403, 71st Cong., 2d sess.). The
latest published map is in the project document.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
adopted the existing project subject to the provisions that local
interests shall provide, at their own expense, a suitable turning
basin near the head of navigation and furnish, without cost to the
United States, suitable bulkheaded areas for spoil disposal. Under
date of March 26, 1931, the Chief of Engineers accepted the assur-
ances of the Commonwealth of Massachusetts that the require-
ments would be fully met.
   Terminal facilities.-These consist of wharves with docking space
of about 6,200 feet.
   The facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 23
percent completed. The channel above Dighton, dredged under
the previous project, has suffered some deterioration in depth and
width. Project dimensions except for minor deficiencies have been
secured up to the upper end of the rock area off Peters Point. On
June 30, 1934, the controlling depth up to the upper end of the
rock area at Peters Point was about 8 feet; above this point it is
claimed by those using the channel constantly that it cannot be
used safely by vessels drawing more than 9 feet, intending to make
the round trip on one tide. To complete the project requires the
deepening of the channel from Peters Point to Taunton. The total
costs and expenditures under the existing project have been $179,-
508.91 for new work.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1938.
              RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                             95
  The sum of $60,000 can be profitably expended during the fiscal
year 1939 in removing rock and boulder shoals from the channel
below Peters Point by contract in the summer and fall of 1938,
                                        Cost and financial summary

Cost of new work to June 30, 1937 ------------------------- $351, 006. 84
Cost of maintenance to June 30, 1937_ ____ _----------        32, 831. 26

      Total cost of permanent work to June 30, 1937------------383, 838. 10
Net total expenditures-----------------------------------        383, 838. 10
Total amount appropriated to June 30, 1937-------------------383, 838. 10

           Fiscal year ending June 30                  1933          1934        1935            1936             1937


Cost of new work.--------------------- $51, 656. 92               $73, 361. 84   $52. 63
Cost of maintenance                                                                        I-------------------
Total expended-   ------------------------          49, 495. 13    60, 300. 97    52. 63
Allotted       ......----------------------------   115, 446. 67 -45,990. 39      52. 63 ..


Amount (estimated) required to be appropriated for completion of
existing project----------      --------------------------- $600, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work---------------------       -------------  60, 000. 00
                                     12. NEWPORT HARBOR, R. I.

  Location.-On the east side of the main entrance to Narragansett
Bay, between Goat Island and the city of Newport. It is about 12
miles northeast of Point Judith Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 236.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1873, March 3, 1881, July 5, 1884, July 13, 1892, and August 18,
1894. The costs and expenditures, prior to operations under the
existing project in 1907, were $234,695.71 for new work and $10,000
for maintenance, a total of $244,695.71. For further detail see page
1751 of Annual Report for 1915.
   Existing project.-This provides for a channel generally 300 feet
wide and 21 feet deep around both ends and along the east side of
Goat Island, about 11/4 miles; the maintenance of those portions of
a channel 750 feet wide and 18 feet deep along the south and east
sides of Goat Island lying outside of the 21-foot channel; an anchor-
age 18 feet deep south and east of the 18-foot channel, about 95 acres;
an anchorage 13 feet deep south of the 18-foot anchorage, and east
of the city stone pier, about 41 acres; and for the removal of Nourma-
hal Rock, in Brentons Cove, to 18-foot depth. The reference plane
is mean low water, the mean tidal range being 3.5 feet. The maxi-
mum range due to the combined effect of wind and other causes, is
6 feet or more.
  The estimate of cost for new work, revised in 1937, is $182,900,
exclusive of amounts expended under previous projects. The latest
(1937) approved estimate for annual cost of maintenance is $1,850.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for the 18-foot chan-
nel along the south and east sides of Goat Island (H. Doc. No. 121,
58th Cong., 2d sess.) ; the act of May 27, 1908, provided for the 13-foot
           20196-37--pt. 1--7
96      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

anchorage and the removal of Nourmahal Rock (H. Doc. No. 438,
59th Cong., 2d sess.); the act of June 25, 1910, provided for the
18-foot anchorage and for increased width of the 18-foot channel
south of Goat Island (H. Doc. No. 610, 61st Cong., 2d sess.) ; and the
act of August 26, 1937, provided for the 21-foot channel around the
ends and east side of Goat Island (Rivers and Harbors Committee
Doec. No. 36, 75th Cong., 1st sess.). The latest published map is in
the last-named document.
   Terminal facilities.-There are 35 piers and wharves grouped
around the harbor area, of which two are owned by the city and two
by the Government. About 20 of the private terminals are open to
public use. The facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 93
percent completed. The 18-foot channel and anchorage, the 13-foot
anchorage, and the removal of Nourmahal Rock were completed in
1915. There are minor shoals in the 18-foot channel and in the
anchorages. The controlling depths are: 21-foot channel, 18 feet;
18-foot channel outside of 21-foot channel, nearly 18 feet; 18-foot
anchorage, about 17 feet; and 13-foot anchorage, 11 to 13 feet. To
complete the project requires the deepening of the 21-foot channel
authorized by the River and Harbor Act of August 26, 1937. The
costs and expenditures have been $445,329.81 for new work and
$14,229.79 for maintenance, a total of $459,559.60.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1938.
   The sum of $37,500 can be profitably expended during the fiscal
year 1939 by contract in the completion of the channel around the
ends and along the east side of Goat Island.
                         Cost and financial summary
Cost of new work to June 30, 1937--------------------------$680, 025.52
Cost of maintenance to June 30, 1937-------------------------24, 229. 79
      Total cost of permanent work to June 30, 1937-----------704, 255. 31

Net total expenditures___ ------------------------------------ 704, 255. 31
Total amount appropriated to June 30, 1937-------------------704, 255. 31

Amount (estimated) required to be appropriated for completion
of existing project-------------------------------------37,           500.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work____________________________________         37, 500. 00
             13. PROVIDENCE RIVER AND HARBOR, R. I.

  Location.-Providence River is formed at the city of Providence
by the junction of the Pawtucket (Seekonk) River and two small
streams which rise in northern Rhode Island. It is tidal and flows
southerly in a deep channel between broad flats about 8 miles, empty-
ing into Narragansett Bay. (See U. S. Coast and Geodetic Survey
Chart No. 278.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, March 2, 1867, March 3, 1873, June 18, 1878, August 2,
1882, August 5, 1886, June 3, 1896, June 13, 1902, March 3, 1905,
       RIVERS AND HARBORS-PROVIDENCE,         R. I., DISTRICT     97
March 2, 1907, June 25, 1910, and March 4, 1913. The cost and ex-
penditures under previous projects were $3,761,411.56 for new work
and $650,136.27 for maintenance, a total of $4,411,547.83. For fur-
ther details see page 1750, Annual Report of 1915, and page 95,
Annual Report of 1936.
   Existing project.-This provides for an approach channel 35 feet
deep at mean low water and generally 600 feet wide through the
river from the deep water of Narragansett Bay opposite North
Point on Popasquash Neck to the turn below Fields Point, 8.1
miles, and thence with the same depth, and of width ranging up to
1,700 feet to Fox Point, excluding a marginal strip 75 feet wide
channelward of the established harbor lines, about 2.6 miles. The
mean tidal range is about 4.6 feet and the maximum range, due to
the combined effect of wind and other causes, is 8 feet or more.
    The estimate of cost for new work, made in 1937, is $1,580,000,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $42,000.
    The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 173, 75th Cong., 1st sess.). The
latest published map is in the project document.
    Local cooperation.-The River and Harbor Act of August 26,
1937, adopted the project subject to the condition that the widen-
ing of the channel on the west side immediately below Fields Point
shall not be undertaken until local interests furnish assurances sat-
isfactory to the Secretary of War that they will proceed with the
downstream extension of the municipal terminal at Fields Point.
Owing to local conditions, assurances are not expected during the
fiscal year 1938.
    Terminal facilities.-The facilities are considered adequate for
existing commerce. (For further details see Port Series No. 18,
Corps of Engineers.)
    Operations and results during fiscal year.-Maintenance dredging
under the previous project with the United States hopper dredge
W7. L. Marshall was in progress from July 6 to December 19, 1936,
inclusive dates.     The entrance channel from North Point to
Squantum was restored to depth of 30 feet by the removal of 1,084,-
020 cubic yards, bin measurement. The total cost was $119,505.39,
all on maintenance of the previous project. The expenditures were
$117,906.08.
    Condition at end of fiscal year.-Work on the existing project has
not been commenced. Under the previous project a channel 600
feet wide and 30 feet deep was dredged from deep water in the bay
to Fields Point, and the harbor area dredged to the same depth,
1,300 to 1,800 feet wide between Fields Point and Fox Point. The
controlling depths at mean low water are: Approach channel up to
Standard' Oil wharf, 30 feet; thence to Field Point, over 29 feet
 (nearly full width), and in the harbor area 29 to 33 feet except at
the edges, as determined in 1936; Green Jacket Shoal (not included
in the existing project), 17 to 24 feet, as determined in 1932. There
have been no costs or expenditures under the existing project.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1937, amounting to $494.61, to maintenance con-
tingencies throughout the year.
98              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The sum of $770,000 can be profitably expended during the fiscal
year 1939 for new work as follows:
Dredging operations in the approach channel, with 2 seagoing hopper
  dredges, for about 22 dredge-months------------------------- $520,000
Rock removal by contract in approach channel (about 12,500 cubic
  yards) ----  ----        _-----_                             _    250,000
           Total-.____------------------------                                                           -          770, 000
                                          Cost and financial summary

Cost of new work to June 30, 1937______________    ______$3, 761, 411. 56
Cost of maintenance to June 30, 1937------------------------650,  136. 27
           Total cost of permanent work to June 30, 1937-----------4, 411, 547. 83

Net total expenditures ----------------------------------                                                    4, 411, 547. 83
Unexpended balance June 30, 1937____________________________                                                         494. 61
           Total amount appropriated to June 30, 1937------------4,                                            412, 042. 44

          Fiscal year ending June 30                       1933          1934             1935        1936            1937

Cost ofnew work..........---------------------           $2, 653.83-----------------------
Cost of maintenance__     __---------------                  195. 59 -------------------------------- 119, 505. 39
                                   ...-----------.....
       Total cost- ..---..-- ...-----                    2, 849. 42 __________      ___     ____      ________      119,505.39

Total expended- .---....---------...    ---------        13, 701. 26   -$181.65    -$8, 748. 34     $1, 599. 31     117, 906. 08

Allotted ..........             __
                           .........    ........ -5,721.92              -597. 50   -15, 497.11     100, 000. 00      20, 000. 00


Balance unexpended July 1, 1936__                                                                              $98, 400. 69
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-------------------------------------                                                        20, 000. 00

      Amount to be accounted for               _      _____                                                    118, 400. 69
Gross amount expended----------------------      $120, 742.48
Less reimbursements collected____--___________      2, 836. 40
                                                                                                               117, 906. 08

          Balance unexpended June 30, 1937____________________                                                       494. 61

Amount (estimated) required    to be appropriated for completion
                       --- -----             ---- ----
of existing project 1__ ____________              ____        _                                             1, 580, 000. 00
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for new work ---        ------         ------                                                 770, 000. 00
   1 Exclusive of available funds.

                           14. PAWTUCKET (SEEKONK) RIVER, R. I.

   Location.--This river rises in the vicinity of Worcester, Mass., and
flows in a general southeasterly direction for about 52 miles, empty-
ing into Providence Harbor at Providence.                                             (See U. S. Coast and
Geodetic Survey Chart No. 278.)
   Previous projects.-Adopted by River & Harbor Acts of March
2, 1867, July 5, 1884, and March 3, 1899. The cost and expenditures
prior to operations under the existing project in 1906, were $334,-
425.32 for new work. For further details see page 1749 of Annual
Report for 1915.
   Existing project.-This provides for a channel 16 to 18 feet deep
at mean low water and 150 to 230 feet wide from Red Bridge up to
        RIVERS AND HARBORS-PROVIDENCE,           R. I., DISTRICT     99
the ledge rock between the wharves at Pawtucket, 3.2 miles; thence
with same depths 100 to 60 feet wide through the ledge to Division
Street Bridge, 0.2 mile. The mean tidal range is about 4.6 feet at
the mouth of the river and about 5 feet at Pawtucket, and the maxi-
mum ranges due to the combined effect of wind and other causes are
about 8 and 7 feet, respectively.
   The estimate of cost for new work, revised in 1922, was $423,035,
exclusive of amounts expended on previous projects but including
the expenditure of funds contributed by the State of Rhode Island
to the amount of $67,792. The latest (1928) approved estimate for
annual cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the 16-foot
channel from Red Bridge, in Providence, to Division Street Bridge
in Pawtucket (H. Doc. No. 113, 56th Cong., 1st sess.); act of March
3, 1909, authorized the expenditure of any balance remaining after
the completion of work then under contract in deepening the channel
to 18 feet at mean low water and increasing the width of such places
as would best serve the interests of navigation; act of March 2, 1919,
provided for widening the channel, except through the ledge at Paw-
tucket, to 150 feet (H. Doc. No. 1283, 64th Cong., 1st sess.); and the
act of September 22, 1922, provided for the present width of channel
through the ledge at Pawtucket (H. Doc. No. 654, 66th Cong., 2d
sess.). The latest published map is in House Document No. 1283,
Sixty-fourth Congress, first session.
   Local cooperation.-Fullycomplied with.
    Terminal facilities.-Including the five terminals at and near
Phillipsdale, the facilities cover about 5,260 feet of docking space, of
which 700 feet is owned by the State of Rhode Island and 4,560 feet
owned and used by private owners. The facilities are considered
adequate for the existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in
1927 at a saving of $17,454 under the estimated cost. The con-
trolling depth at mean low water, as determined in November 1934,
was nearly 17 feet to Bass Rock and thence, except for rocky shoals
at the edges opposite Bass Rock, about 17 feet to Division Street.
The head of navigation is at the head of Pawtucket Falls, about 5.2
miles above the mouth of the river. The costs and expenditures
under the existing project have been $337,788.85 for new work
and $296,621.71 for maintenance, a total of $634,410.56. In addi-
tion, the sum of $67,792 was expended for new work from contrib-
uted funds.
    Proposed operations.-It is proposed to apply the sum of $10,000
allotted in July to removing, by contract, four small outcrops of
rock from the channel edges near Bass Rock, to be completed in
December 1938.
    No additional funds can be profitably expended during the fiscal
year 1939, as the completion of the above work will leave the channel
in satisfactory condition to meet the needs of existing commerce.
100           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                       Cost and financial summary
Cost of new work to June 30, 1937------------------------1 $672, 214. 17
Cost of maintenance to June 30, 1937------------------------ 296,621. 71
      Total cost of permanent work to June 30, 1937----------                                                968,835. 88
Net total expenditures-----------------------------------------                                              968, 835. 88
Total amount appropriated to June 30, 1937--------------------                                               968, 835. 88

         Fiscal year ending June 30                   1933          1934          1935                1936         1937

Cost ofnew work-..............
                           -....    I. .  .     .      .  .       .                           .         .
Cost of maintenance----------------         $24, 902. 85 $93, 752. 26
                  .................------------..........
                                       --                                                     -----             _............
Total expended......--------------..   -------..... ------------ 16, 499. 10   102, 156. 01
Allotted................................. .                     121, 991. 33 -3,336. 22........
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------                                                    $10, 000. 00
Amount available for fiscal year 1938 ---------------------------                                             10, 000. 00
   I In addition, $67,792 was expended from contributed funds.

                 15. HARBOR OF REFUGE AT BLOCK ISLAND, R. I.

   Location.-Located on the east side of Block Island, near the south
end of the inner curve of the shore line. It is 13 miles south-southwest
from Point Judith Harbor and about 25 miles southeasterly from
Stonington Harbor, Conn. (See U. S. Coast and Geodetic Survey
Chart No. 276.)
   Existing project.-This provides for a rubble-mound breakwater
extending northerly about 1,950 feet from the shore; a similar break-
water about 1,100 feet long, extending northerly and easterly, en-
closing, with the main breakwater, an area about 800 feet square
designated as the inner harbor; masonry walls in the southeastern
corner of the inner harbor enclosing an area nearly 300 feet square
designated as the basin; and for dredging to a depth of 15 feet at
mean low water the outer protected area and about 67 percent of the
inner harbor and of the basin. The mean tidal range is about 3 feet,
and the maximum range, due to the combined effects of wind and
other causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1928, is $615,300. The
latest (1928) approved estimate for annual cost of maintenance is
$3,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided for the main break-
water (annual report for 1868, p. 785, and S. Misc. Doc. No. 81, 40th
Cong., 2d sess.); act of August 5, 1886, provided for the breakwater
enclosing the inner harbor (S. Doc. No. 27, 48th Cong. 2d sess., and
annual report for 1885, p. 610); act of June 3, 1896, provided for
raising the crest of the main breakwater and making it sandtight
 (H. Doc. No. 83, 54th Cong., 1st sess.), act of July 25, 1912, made final
provision for the basin walls and for the present dimensions of the
dredged areas (H. Doc. No. 828, 60th Cong., 1st sess.). The latest
published map is in the last-mentioned document.
   Recommended modifications of project.-It is recommended that
this project be modified by eliminating the dredging of the'outer
               RIVERS AND HARBORS-PROVIDENCE,                                          R. I., DISTRICT                      101
harbor west of the entrance channel (H. Doc. No. 467, 69th Cong., 1st
sess.).
  Terminal facilities.-These consist of two wharves with a total of
680 feet of docking space, which is adequate for present needs.
   Operations and results during fiscal year.-Maintenance dredging
in the channel through the harbor began on June 18 and was in prog-
ress at the close of the fiscal year. During the period about 8,514
cubic yards of sand were dredged and disposed of by the hydraulic
process, completing maintenance through the inner harbor and at the
basin entrance. The costs were $3,840.26 for maintenance, and the
total expenditures were $261.87.
   Condition at end of fiscal year.-The existing project is about 94
percent completed. The breakwater and harbor walls were completed
in 1916. The inner harbor and basin have been dredged to project
dimensions, and a channel 60 to 130 feet wide and 15 feet deep has been
dredged from deep water outside of the harbor up to the town wharf.
The controlling depth at mean low water on June 30, 1937, in the chan-
nel through the outer harbor was 14 feet; and thence, through the
inner harbor to the head of the basin, 16 feet and more. The inner
harbor breakwater and the basin walls are in good condition. To
complete the project requires the deepening of the outer protected
area adjacent to the dredged channel. The costs have been $576,856.47
for new work and $151,005.28 for maintenance, a total of $727,861.75,
and the expenditures a total of $724,283.36.
  Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1937, amounting to $5,862.95, as follows:
Accounts payable, June 30, 1937------------------------------$3, 578. 39
Maintenance dredging under contract in force to be completed in
  July 1937--        ----------------------------------------   2, 284. 56

            Total                        ----------------------                   .....-------                     5, 862. 95
  No additional funds can be profitably expended during the fiscal
year 1939, as the completion of the above work will place the improve-
mernt in satisfactory condition for a few years.
                                           Cost and financial summary

Cost of new work to June 30, 1937------------------------------ $576, 856. 47
Cost of maintenance to June 30, 1937----- -------------------- 151, 005. 28
      Total cost of permanent work to June 30, 1937---- ---------                                              727, 861. 75
Minus accounts payable June 30, 1937--------------------------                                                   3, 578. 39
     Net total expenditures-----------------------------                                                       724, 283. 36
Unexpended balance June 30, 1937------- ----------------                                                         5, 862. 95
           Total amount appropriated to June 30, 1937---------                                         --      730, 146. 31

           Fiscal year ending June 30                   1933          1934               1935          1936               1937

Cost of new work-        -......     . -- ------------               ----------
Cost of maintenance-.. ------------------  $13, 590.30              $8, 230.69  $3, 690.53          $17,460.06        $3,840.26
Total expended-----                       ---------- 17, 170. 36
                                       .--------                     8, 405. 46        4, 896.79     17, 525. 18           261.87
Allotted........
       -----------------------------                  11, 923. 79    9, 741.97        19, 613. 81     6, 000. 00   ....
102           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 _____-----------------------------                                    $6, 124. 82
Gross amount expended                 ---------------------------                                          261.87

    Balance unexpended June 30, 1937---------------------       5, 862. 95
Amount covered by uncompleted contracts------------------------5, 862. 95

Amount (estimated)- - required         to be appropriated for completion of
                      - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- -
existing project 1                                                                                       38, 500. 00
   1   Exclusive of available funds.

                            16. NEW LONDON HARBOR, CONN.

   Location.-This harbor is on the north shore of Long Island
Sound, at its eastern end, and about 14 miles east of the mouth of
the Connecticut River. (See U. S. Coast and Geodetic Survey Chart
No. 293.)
   Previous projects.-Adopted by acts of June 14, 1880, March 3,
1881, and July 13, 1892. The cost and expenditures, prior to the
adoption of the existing project in 1902, were $19,800 applied to new
work in New London Harbor and $21,000 applied to new work in
Shaws Cove, a total of $40,800. For further details see page 1753
of Annual Report for 1915.
   Existing project.--This provides for an entrance channel generally
600 feet wide, widened at the approach to the State pier, 33 feet deep
and about 3.8 miles long from Long Island Sound to the State pier;
a channel 400 feet or more in width, 23 feet deep, and about 6,000
feet long skirting the water front of the city; a maneuvering area 0
to 450 feet wide, 23 feet deep, west of the main channel and south of
the State pier; and for dredging Shaws Cove to a depth of 15 feet.
The plane of reference is mean low water, the mean tidal range being
2.4 feet. The maximum tidal range, due to the combined effects of
wind and other causes, is 7 feet or more. The estimate of cost for new
work, revised in 1937, is $568,400, exclusive of amounts expended on
previous projects. The latest (1937) approved estimate for annual
cost of maintenance is $3,900.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the water-front
channel (H. Doc. No. 392, 56th Cong., 1st sess.) ; the act of June 25,
1910, provided for dredging in Shaws Cove (H. Doc. No. 329, 60th
Cong., 1st sess.); the act of July 27, 1916, provided for the entrance
channel (H. Doc. No. 613, 63d Cong., 2d sess.) ; and the act of August
26, 1937, provided for the maneuvering area and made final provision
for the present extent of the entrance channel (River and Harbor
Committee Doc. No. 82, 74th Cong., 2d sess.). The latest published
maps are in the two last-mentioned documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The total developed shore frontage is nearly
3 miles. The total length of berthing space available is about 19,755
feet. The facilities are considered adequate for the existing com-
merce. (For further details see Port Series No. 18, Corps of Engi-
neers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 97
percent completed. The water-front channel, Shaws Cove, and the
entrance channel to deep water in the upper harbor were completed
in 1933. To complete the project requires the deepening of the 23-foot
               RIVERS AND HARBOtS-I'PROVIDENCE,                                           R. I., DISTRICT                    103

maneuvering area, the channel widening at the approach to the State
pier having been dredged by the State in 1936. The controlling
depths at mean low water are: Entrance channel from Long Island
Sound to State pier, 33 feet, as determined in 1933 and 1936; water-
front channel, except in Winthrop Cove, about 20 feet; Winthrop
Cove, 24 feet, all as determined in 1930; Shaws Cove, 16 feet, ascer-
tained in 1934. The costs and expenditures have been $558,390.18 for
new work and $49,623.62 for maintenance, a total of $608,013.80.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1938.
   The sum of $10,000 can be profitably expended during the fiscal
year 1939 by contract in completing the maneuvering area west of the
main channel and south of Winthrop Cove.
                                                    Cost and financial summary

Cost of new work to June 30, 1937----------------------------                                                      $599, 190. 18
Cost of maintenance to June 30, 1937--------------------------                                                       49, 623. 62
      Total cost of permanent work to June 30, 1937--------------648, 813. 80
Net total expenditures-----------------------------------------48,       813. 80
Total amount appropriated to June 30, 1937                               813.80
                                                                   6----------------------48,

           Fiscal year ending June 30                          1933          1934           1935           1936             1937


Cost of new work-_ ---------------------                    $90, 902. 92
Cost of maintenance              -------------------
                                   .....                     11, 677. 59   $8, 392. 45       $39.36    .....----       ..     .    .
        Total cost-    -----
                          -------------------               102, 580. 51    8, 392. 45        39.36
Total expended-....              --..........-...     ..-   102, 580. 51    7, 716. 17        39.36
Allotted-------...............           .------            102, 345. 69   11,942. 85    -3, 511. 13   .


Amount (estimated) required to be appropriated for completion of
existing project--------------------------------------------     $10,000.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work ----------------------------------------
                                      ______                       10, 000. 00

                                                    17. THAMES RIVER, CONN.

  Location.-This is a tidal estuary varying in width from about
400 feet to three-fourths of a mile, and extending from the junction
of the Yantic and Shetucket Rivers at Norwich, Conn., 15 miles
southerly to Long Island Sound at New London. (See U. S. Coast
and Geodetic Survey Chart No. 359.)
  Previous projects.-Adopted by the River and Harbor Acts of
July 4, 1836, and March 3, 1879. The cost and expenditures prior to
operations under the existing project in 1882 were $184,943.46, of
which $148,347.59 was for new work and $36,595.87 was for main-
tenance. For further details see page 1754 of Annual Report for
1915.
   Existing project.-This provides for a channel 25 feet deep and
250 feet wide to the upper end of Bartletts Crossover and thence to
Norwich generally 200 feet wide, with increased width in the bends,
through Long Reach, and at the head of navigation, a total distance
of about 8.6 miles; the construction of five training walls, with their
tops at mean high water, located, respectively, at Mohegan pile and
stone, about 2,750 feet long; Trading Cove, riprap, 2,325 feet long;
104      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Long Rock, riprap, about 2,750 feet long; Rolling Mill, riprap about
3,300 feet long; and Norwich, riprap, 1,050 feet long; and the re-
moval of obstructions in the Shetucket River at Norwich. The plane
of reference is mean low water, the mean tidal range being 2.4 feet
at New London, 2.7 feet at Allyns Point, and 2.5 feet at Norwich.
The maximum range, due to the combined effect of wind and other
causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1935, is $1,508,400,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $29,300.
   The existing project was authorized by the following river and
harbor acts: The act of August 2, 1882, provided for the training
walls (Annual Report for 1882, p. 606) ; act of June 25, 1910, pro-
vided for removal of obstructions in the Shetucket River (H. Doc.
No. 397, 61st Cong., 2d sess.); act of January 21, 1927, provided
for a channel 18 feet deep above Allyns Point (H. Doc. No. 107, 69th
Cong,, 1st sess.) ; act of July 3, 1930, provided for the present chan-
nel dimensions up to Allyns Point (Rivers and Harbors Committee
Doc. No. 14, 71st Cong., 2d sess.); and the act of August 30, 1935,
made final provision for the present channel dimensions above Allyns
Point (Rivers and Harbors Committee Doc. No. 18, 74th Cong., 1st
sess.). The latest published maps are in the two last-mentioned
documents.
   Terminal facilities.-Wharves along the river and at Norwich are
mainly of the bulkhead type, both with and without pile aprons.
The facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 46
percent completed. The training walls were completed in 1906, ex-
cept the upper end of the Rolling Mill dike, which is replaced by
adjacent shore improvements. The training walls are in fair condi-
tion. The controlling depth at mean low water, as determined in July
1933, was 26 feet to Allyns Point, thence as determined in October
1934, 19 feet to Norwich, and thence 12 feet in the Shetucket River up
to the town wharf. To complete the project requires the deepening of
the channel above Allyns Point. The costs and expenditures under
the project have been $688,330.08 for new work and $423,506.20 for
maintenance, a total of $1,111,836.28.
   Proposed operations.-No funds were available at the close of the
year. It is proposed to apply the sum of $10,000, allotted in July, to
maintenance dredging in the basin at Norwich, by contract, to be
completed during October 1937.
   The sum of $820,000 can be profitably expended during the fiscal
year 1939 by contract in the completion of the channel above Allyns
Point.
                        Cost and financial summary

Cost of new work to June 30, 1937_______________________--$836, 677. 67
Cost of maintenance to June 30, 1937 ------------------------- 460, 102. 07
      Total cost of permanent work to June 30, 1937-----------   1, 296, 779. 74
Net total expenditures---------
                        ___      -----------
                                       __-                 -     1, 296, 779. 74
Total amount appropriated to June 30, 1937_                      1, 296, 779. 74
               RIVERS AND HARBORS-PROVIDENCE,                                                R. I., DISTRICT                          105

           Fiscal year ending June 30                         1933            1934             1935              1936           1937


Cost of new work_- ---- _..    -----
                             __-....    _ $49, 456. 28                    $11, 540. 41-------------------------
                                  __
Cost of maintenance-----------_--------   .----------                      28, 279.55 $188, 831.52 ...-------------------

       Total cost...........----------------------.......   49, 456. 28    39, 819.96      188, 831. 52 ...------------------

Total expended---....       .-.--.----..---..               36, 323. 76    36, 913. 71     204, 924. 41 ..------------------

Allotted..__ _---.-_..--..---     -.    -----               67, 801. 22   222, 186. 45 -11, 825. 79 ............------------   ----



Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937        -------------------------------------                                  $10, 000
Amount available for fiscal year 1938 ---------------------------                                 - 10, 000
Amount (estimated) required to be appropriated                  for completion of exist-
                             -- -- -- --- -- -- -- --- -- -- -- -- -- -
ing project 1                                                                                      820, 000
Amount that can be profitably expended in fiscal                   year ending June 30,
                     1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1939, for new work                                                                                 820, 000
   1 Exclusive of available funds.

                 18. CONNECTICUT RIVER BELOW HARTFORD, CONN.

   Location.-This river has its source in Connecticut Lake in north-
ern New Hampshire, flows southerly 380 miles, and empties into Long
Island Sound at Saybrook, Conn., 14 miles west of New London.
Hartford, now the head of commercial navigation, is 51.9 miles by
channel from the mouth. A dam at Holyoke, 34 miles above Hartford,
completely interrupts navigation. (See U. S. Coast and Geodetic
Survey Charts Nos. 215, 254, 255, and 256.)
   Previous projects.--Adopted by the River and Harbor Acts of
July 4, 1836, and July 11, 1870. The cost and expenditures, prior to
operations under the existing project in 1911, were $287,374.29 for new
work and $366,348.47 for maintenance, a total of $653,722.76. For
further details see page 1754 of annual report for 1915.
   Existing project.---This provides for a channel 15 feet deep at
mean low water, 300 feet wide from the mouth to the Lyme railroad
bridge, about 3.4 miles, and thence 150 feet wide to Hartford, the
channel to be obtained by dredging and the construction of dikes,
training walls, revetments, and accessory works; for two riprap jetties
at the mouth of the river, the tops to be 5 feet above high water and 6
feet wide, the easterly one about 2,300 feet and the westerly about 2,250
feet in length; and for a training dike about 3,700 feet long at Hart-
ford. The mean tidal range is 3.4 feet at the mouth and, on low water,
1.2 feet at Hartford. The maximum tidal range at the mouth, due to
wind or other causes, is 8 feet or more. At Hartford the usual rise
due to spring freshets is between 16 and 24 feet above mean low water.
The maximum recorded freshet at Hartford (March 1936) was 35.5
feet above mean low water. Below Hartford the height of the crest
of the freshet decreases rapidly.
   The estimate of cost for new work, revised in 1935, is $918,000. The
latest (1932) approved estimate for annual cost of maintenance is
$53,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 10, 1872, provided for the jetties at the
mouth (present dimensions approved by the Chief of Engineers Dec.
105     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

22, 1887); act of March 3, 1881, provided for the Hartford dike (pres-
ent dimensions authorized by the Chief of Engineers in 1889); act of
February 27, 1911, provided for the present dimensions of the channel
over Saybrook bar (H. Doc. No. 1294, 61st Cong., 3d sess.); act of
March 2, 1919, provided for dikes, training walls, and revetments
(H. Doc. No. 132, 65th Cong., 1st sess.) ; and the act of August 30, 1935,
made final provisions for the present channel dimensions and addi-
tional dikes, training walls, revetments, and accessory works (H. Doc.
No. 49, 73d Cong., 1st sess.). For latest published maps see the last-
mentioned document and House Document No. 132, Sixty-fifth Con-
gress, first session.
   Local cooperation.-The River and Harbor Act of August 30, 1935,
authorized the 15-foot channel up to Hartford and additional dikes,
training walls, and revetments, subject to the provision that local
interests shall furnish, free of cost to the United States, suitable areas
for the disposal of dredged material during initial construction and
for future maintenance as and when needed. Areas have been fur-
nished where required and it is understood that future requirements
will be met.
   Terminal facilities.-There are two or three wharves at each of the
river towns, one or more in each town being open to public use. At
Hartford and at Middletown there is approximately one-half mile of
wharf frontage along the west bank of the river. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-Improvement dredging
by contract was commenced on September 28, 1936, suspended on
January 1, 1937, resumed March 13 and continued with occasional
interruptions on account of freshet conditions until June 18, 1937,
completing, except for two small cable crossings at Hartford, the
15-foot channel through the river bars. During the period, a total
of 1,720,393 cubic yards, were removed by the hydraulic process.
The cost of this dredging was $274,301.87, all for new work. Under
a contract for maintenance, in progress at the beginning of the fiscal
year and completed on August 15, 1936, the channels through the
river bars were restored to depths of 12 feet and widths of 75 and
100 feet. During this period the total length of channel thus
dredged was about 9.200 feet and a total of 71,239 cubic yards was
removed. The cost of this dredging was $23,683.20, all applied to
maintenance. The total net yardage removed under the contract
was 91,896. Using hired labor and plant, minor repairs were made
to the revetments at Clay Banks, Naubuc, Press Barn, Crow Point,
and Gildersleeve, using 670 tons of stone. The costs for this work
were $1,412.07, applied to maintenance. The total costs were $274,-
301.87 for new work and $25,095.27 for maintenance, a total of
 $299,397.14, and the total expenditures, $261,806.86.
    Condition at end of fiscal year.-The existing project is about 72
percent completed. Under a previous authorization the 12-foot chan-
nel from the mouth to Hartford was completed in 1914. The Say-
brook jetties and training walls at Hartford, Clay Banks, and Sears
Shoal were completed in 1915. The stone dikes and timber spurs
at Pistol Point, Glastonbury, Press Barn, Naubuc, Cys Hollow, and
Clay Banks were completed in 1927. The Clay Banks, Cys Hollow,
        RIVERS AND HARBORS-PROVIDENCE,                           R. I., DISTRICT                   107
Naubuc, Press Barn, Glastonbury (including Two Piers), and Gilder-
sleeve Island Reaches have been revetted.
   The jetties, training walls, dikes, and revetments are in fair condi-
tion, except that minor repairs are needed to some of the dike and
revetment structures above named.
   Due to the spring freshet of 1937, the channel dimensions above
Middletown are somewhat diminished. On June 30, 1937, the con-
trolling depths at mean low water were about 16 feet (not full width)
across the bar at the mouth, thence about 12 feet to Hartford. To
complete the project requires the deepening at cable crossings at
Hartford and the construction of additional permanent works. The
costs under the existing project have been $660,398.59 for new work
and $625,595.09 for maintenance, a total of $1,285,993.68, and the
total expenditures $1,241,525.47.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1936, amounting to $52,520.40, together with
$50,000 allotted in July and $100,000 allotted in September as follows:
  Accounts payable, June 30, 1937--------------------------$45,255.47
New work:
    Dredging on river bars, under contract in progress to be com-
      pleted in August 1937-----------------------------------        4, 045. 42
    Dikes, training walls and accessory works, by contract, October
      1937-June 1938-------------------            -------- ------- 100,000.00
Maintenance :
    Dredging bar at entrance, by contract, September-December
      1937, about 125,000 cubic yards of sand------------------- 25, 000. 00
    Dredging river bars with seagoing hopper dredge, to be com-
      pleted during September 1937----------------------------       25, 000. 00
    Repairs to permanent works August and September 1937, by
      hired labor-----       -------------------------------------    3, 219. 51

         Total----------------            ----------- --------------- 202, 520. 40
  The additional sum of $150,000 can be profitably expended during
the fiscal year 1939 as follows:
New work: Dikes, training walls, revetments and accessory works,
by contract, July to December 1938      --------------------------     $100, 000
Maintenance:
   Dredging through river bars with seagoing hopper dredge about
      four months during the summer of 1938---- ------------              48, 000
   Repairs to permanent works, August and September 1938, by
      hired labor-----------------       ---------------------------       2, 000
        Total for maintenance .---------       ----------------- ------- 50, 000

        Total for all work-   -----       --
                                      -------------------.---                   -       -       150, 000
                          Cost and financial summary

Cost of new work to June 30, 1937-  -   ____-_-_-_- ____                                    $947, 772. 88
Cost of maintenance to June 30, 193-------------------                              -        991, 943.56
      Total cost of permanent work to June 30, 1937 _____                                1, 939, 716. 44
Undistributed costs June 30, 1937----------------------_ _                                       787. 26

     Net total cost to June 30, 1937L. .------------     _                               1, 940, 503.70
Minus accounts payable June 30, 1937.------------------_                                     45, 255. 47

     Net total expenditures_-- _               _           __----------------            1, 895, 248. 23
Unexpended balance June 30, 1937          ______._------      -----------                    52, 520. 40

      Total amount appropriated to June 30, 1937-....---                                 1, 947, 768.63
108                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


             Fiscal year ending June 30                                1933             1934           1935           1936            1937


Cost of new vork -----------..........--------------------------------------------                                                 $274, 301.87
Cost of maintenance--....--...--_---------............               $16, 682. 03    $22, 739. 77   $23, 382. 75   $51, 871. 81      25, 095. 27

                                            16, 682. 03 22, 739. 77
         Total cost-...........-------.............--------------   23, 382. 75                                     51, 871. 81     299, 397. 14

                                     482. 68
                                   16,       21, 997. 22
Total expended......---------------................                                                  21, 476. 24    48, 805. 97     261, 806. 86
Allotted___.......___-......--         ............. 19, 766. 79                      22, 891. 15    44, 500. 00    26, 000. 00     288, 500. 00


Balance unexpended July 1, 1936                                                                                               $25, 827. 26
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936 __----    ---------                                                                                     288, 500. 00

      Amount to be accounted for -_____---__---------                                                                         314, 327. 26
Gross amount expended_________      -     -___________-                                                       __              261, 806. 86
      Balance unexpended June 30, 1937____--------------                                                                          52, 520. 40
Outstanding liabilities June 30, 1937----------------    $306. 12
Amount covered by uncompleted contracts----------- 48, 994. 77
                                                                                                                                  49, 300. 89

     Balance available June 30, 1937_-_______----- _______--                                                                       3, 219. 51
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937                                                                                                       15-------------------------------
                                                                                                                              150, 000. 00
              Balance available for fiscal year 1938-----                                                -----                153, 219. 51

Amount (estimated) required to be appropriated for completion
  of existing project 1                                                                                                       153, 500. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For new work           - --- --- -- -- -- -- --- -- -- --- -- -- -- --- -- --
                                                                                                                              100, 000. 00
   For maintenance 1- -                                                                                                        50, 000. 00

              Total -----------------------------------------------                                                           150, 000. 00
    1 Exclusive of available funds.

                                        19. DUCK ISLAND HARBOR, CONN.

   Location.--On the north shore of Long Island Sound about 23
miles east of New Haven, Conn. (See U. S. Coast and Geodetic
Survey Chart No. 216.)
  Previous projects.--Adopted by River and Harbor Act of Septem-
ber 19, 1890. The cost and expenditures prior to the adoption of the
existing project in 1910 were $114,867.90 for new work and $5,334.10
for maintenance, a total of $120,202. For further details see page
1755 of Annual Report for 1915.
   Existing project.-This provides for the construction of three rip-
rap breakwaters, viz, one extending northwardly from Duck Island,
1,100 feet, one extending westwardly from Duck Island 2,697 feet,
and one extending southwardly from Stone Island, just south of
Kelsev Point, 3,750 feet, each breakwater to be 8 feet wide on top,
9 feet high above mean low water, with side slopes of 2 on 3, except
on the northerly side of the one extending westerly from Duck Island
and the westerly side of the one extending northwardly from Duck
Island, where the slopes are to be 1 on 1; and for dredging to a depth
of 16 feet at mean low water a portion of the protected area back of
the breakwaters at Duck Island. The mean tidal range is 4.2 feet,
              RIVERS AND HARBORS-PROVIDENCE,                                     R. I., DISTRICT                             109
and the maximum range, due to the combined effect of wind and other
causes, is 9 feet or more.
   The estimate of cost for new work, revised in 1916, was $370,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $10,000.
   The existing project was. authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the breakwaters
H. Doc. No. 398, 60th Cong., 1st sess.); the act of July 27, 1916,
provided for the dredging (H. Doc. No. 812, 64th Cong., 1st sess.).
   For latest published map, see the last-mentioned document.
   Terminal facilities.-None. Harbor used for refuge only.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1917 at a saving of $2,702 under the estimated cost, the
breakwaters having been completed in 1914. The breakwaters are
in good condition. The central portions of the anchorage area have
project depth. The controlling depths in the protected area behind
the breakwater as determined in October 1935 were 11 to 14 feet in
the northern portion, 17 to 18 feet in the central portions, and in the
extreme southeastern corner about 8 feet, all at mean low water.
The costs and expenditures under the existing project have been
$367,297.91 for new work and $249,896.50 for maintenance, a total of
$617,194.41.
  Proposed operaltions.-No funds are available and no operations
are contemplated during the fiscal year 1938.
  The sum of $50,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging in the area behind the break-
waters by contract during the fall of 1938, removing about 250,000
cubic yards of mud.
                                          Cost and financial summary
Cost of new work to June 30, 1937______     ____              $482,165.81
Cost of maintenance to June 30, 1937-------------------------255, 230. 60
           Total cost of permanent work to June 30, 1937 _________
                                                                -                                              737, 396. 41
Net total expenditures                       -               -----------                     ---               737, 396. 41
Total amount appropriated to June 30, 1937-------------------                                                  737, 396. 41

           Fiscal year ending June 30                 1933          1934           1935               1936                 1937


Cost of new work....
Cost of maintenance .............--------------                  ----      ..       $66. 56        $91, 675. 60--
Total expended......---------------------             -------- -----------          232.91          91,509.25---------

Allotted............-----------------      ------------------- ---------        100, 100.00        -8,357.84        ----
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance--        -------------------------     $50,000.00

                                        20. BRANFORD HARBOR, CONN.

  Location.-On the north shore of Long Island Sound, 5 miles
east of New Haven Harbor. (See U. S. Coast and Geodetic Survey
Chart, No. 217.)
  Existing project.-This provides for a channel 81/ feet deep and
100 feet wide through the shoals at the mouth of the harbor, about
110        .    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

one-half mile and of the same depth, width, and length between the
lower and upper wharves in the river. The plane of reference is
mean low water. The mean tidal range is 51/2 feet, and the maxi-
mum range, due to the combined effect of wind and other causes, is
10 feet or more.
   The estimate of cost for new work, revised in 1905, was $10,000.
The latest (1928) approved estimate for annual cost of maintenance
is $2,500.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for dredging be-
tween the lower and upper wharves in the river (H. Doc. No. 100,
56th Cong., 2d sess., and Annual Report for 1901, p. 1188); the act
of March 2, 1907, provided for the dredging at the mouth of the
harbor. (For map, see H. Doc. No. 1292, 64th Cong., 1st sess.)
   Terminal facilities.-Terminal facilities are limited to two wharves
near the head of the harbor and one at the mouth of the river.
These facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1907, at a saving of $462 under the estimated cost. The controlling
depths at mean low water, as determined in 1937 were 61/2 feet
through the shoals at the mouth and thence about 7 feet to the head
of navigation. The costs and expenditures under the project have
been $9,537.45 for new work and $47,889.39 for maintenance, a total
of $57,426.84.
   Proposed operations.-There were no funds available at the close
of the year. It is proposed to apply the sum of $29,000 allotted in
July to maintenance dredging of about 78,800 cubic yards in the
harbor and river, by contract, September to December 1937.
    No additional funds can be profitably expended during the fiscal
year 1939 as the completion of the above work will place the chan-
nels in condition to meet the needs of navigation for several years.
                                                Cost and financial summary

Cost of new work to June 30, 1937 _.___1__1__1-_           ..                                                          $9, 537. 45
Cost of maintenance to June 30, 1937------------------------                                                           47, 889.39
            Total cost of permanent work to June 30, 1937-------------                                                 57, 426. 84
            Net total expenditures-----------------------                                                              57, 426. 84
            Total amount appropriated to June 30, 1937_______---
                                                            -        ___                                               57, 426. 84

           Fiscal year ending June 30                                 1933             1934       1935          1936       1937


Cost of new work...................................................
Cost of maintenance_____------                     -            ------
                                                              ___________         $9, 366. 04      $43.92

Total expended_------.........___
                               .-                   ______            $187. 52    $9, 178. 52       43. 92 ..
Allotted       .......----------------------------               12, 781. 40     -3,    615. 01     43. 92 _


Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937____
                        ---    -   -           --
                                       - _______-                 $29, 000. 00
Amount available for fiscal year 1938----------------------------  29, 000. 00
       RIVERS AND HARBORS-PROVIDENCE,          R. I., DISTRICT    111
                    21. NEW HAVEN HARBOR, CONN.

    Location.-The harbor is on the north shore of Long Island Sound,
about 71 miles to the east of New York City. (See U. S. Coast and
Geodetic Survey Chart No. 218.)
    Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, March 3, 1871, June 10, 1872, and for West River March 3,
1905. The cost and expenditures in the main harbor prior to the
adoption of the 1899 project and in West River prior to its consoli-
dation with the main harbor were $331,625.66 for new work and
$32,570 for maintenance, a total of $364,195.66. For further details,
see page 1755 of Annual Report for 1915.
    Existing project.-This provides for a channel 25 feet deep, 400
feet wide, and 31/2 miles long from Long Island Sound to opposite
Fort Hale; thence of same depth 500 feet wide (increased to 1,111
feet at the turn opposite Long wharf) 2 miles to Tomlinson Bridge;
two anchorage basins below Tomlinson Bridge of 16- and 15-foot
depths; a pile-and-riprap dike, total length about 4,200 feet, to con-
tract tidal flow at Fort Hale Bar; a channel 12 feet deep and 100
to 150 feet wide, from the southwest corner of the 16-foot anchorage
basin via Oyster Point and the West Haven wharf front to Kimberly
Avenue Bridge; thence 12 feet deep and prevailing width of 75 feet
up West River approximately to the railroad bridge, and an anchor-
age basin 6 feet deep in West River opposite Mars wharf; a channel
100 feet wide and 12 feet deep from the 15-foot anchorage basin
toward Brewery Street, about 1,500 feet; a channel 200 feet wide and
18 feet deep up Quinnipiac River to Ferry Street Bridge, and thence
200 feet wide and 16 feet deep to Grand Avenue; a channel up Mill
River 12 feet deep, 200 feet wide, to the junction of the two branches
above Chapel Street, thence to Grand Avenue, 100 feet wide in the
east branch and generally 125 feet wide in' the west branch; and the
removal of certain obstructive rocks in Morris Cove. All depths
refer to mean low water, the mean tidal range being 5.8 feet. The
maximum tidal range, due to the combined effect of wind and other
causes, is 10 feet or more.
    The estimate of cost for new work, revised in 1935, was $950,000,
exclusive of amounts expended on previous projects.         The latest
  (1935) approved estimate for annual cost of maintenance is $29,000.
    The existing project was authorized by the following river and
harbor acts: The act of August 2, 1882, provided for the Sandy
Point dike (plans approved by a Board of Engineers Oct. 2, 1882);
act of March 3, 1899, provided for the 16-foot anchorage basin
  (H. Doc. No. 82, 55th Cong., 1st sess.); act of June 25, 1910, pro-
vided for the Brewery Street Channel, for the removal of rocks
in Morris Cove, and made provisions for the present dimensions of
the 15-foot basin (H. Doc. No. 1159, 60th Cong., 2d sess.); act of
July 25, 1912, made provisions for the present dimensions of the
channels in Mill River (H. Doc. No. 26, 62d Cong., 1st sess) and
for the present dimensions of the West River Channel and anchor-
age (H. Doc. No. 535, 62d Cong., 2d sess.); act of July 3, 1930,
made final provisions for the present channel dimensions in Quin-
nipiac River (H. Doc. No. 686, 69th Cong., 2d sess.); the Public
      20196-37-pt. 1--8
 112      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Works Administration, September 6, 1933, and the River and Har-
bor Act of August 30, 1935, provided for the 25-foot channel (H. Doc.
  No. 479, 72d Cong., 2d sess.). For latest published maps see the
last-named document and House Documents Nos. 497, Sixty-fourth
Congress, first session, and 686, Sixty-ninth Congress, second session.
    Terminal facilities.-The wharves and piers served by this im-
provement are grouped near the head of the main harbor; on both
sides of Mill River between Chapel Street and Grand Avenue; on
both sides of Quinnipiac River throughout the greater part of its
improved portion; at Oyster Point and along the westerly side of
West River. The total length of berthing space available is about
26,525 feet. The facilities are not considered adequate, and various
plans have been prepared and considered by the municipality for
extensive additions and improvements.        (For further details see
Port Series No. 18, Corps of Engineers.)
    Operations and results during fiscal year.-Maintenance dredging
under contract was commenced on April 26, 1937, and was in progress
at the close of the year. During the period there were removed by
the hydraulic process about 5,155 cubic yards from the outer 430
feet of the West River Channel and about 305,256 cubic yards from
the 16-foot anchorage, completing the portion of the anchorage north
of the entrance to West River. The costs for this dredging were
 $49,986.03, all applied to maintenance.       The total expenditures
amounted to $32,943.71.
    Condition at end of fiscal year.-The existing project is practically
completed.     The controlling depths at mean low water are: Main
channel nearly up to Tomlinson Bridge, 25 feet, except at the edges,
thence to Tomlinson Bridge, 18 feet, as determined in 1937: anchor-
age basins, 18 feet, 15 to 18, 15, and 0 to 6 feet, respectively; West
River, 10 feet to Kimberly Avenue, and 7 feet to the railroad
bridge, as determined in 1937; Mill River, 11 feet to the branches,
81/2 feet to head of east branch, and 10 feet to head of west branch,
as determined in 1937; Quinnipiac River to Ferry Street, 17 feet,
and thence to Grand Avenue, nearly 14 feet; and Brewery Street
Channel, nearly 12 feet, as determined in 1934. The dike at Fort
Hale bar is in poor repair and some of the channels require mainte-
nance.    The costs from regular funds have been $597,993.54 for
new work and $845,922.39 for maintenance, a total of $1,443,915.93.
The expenditures have been $1,427,336.82.
   The deepening of the main channel authorized by the Public
Works Administration is completed nearly up to Tomlinson Bridge.
From Public Works funds the costs and expenditures have been
$350,083.75, all for new work.
   The total costs, all funds, have been $1,793,999.68, of which $929,-
619.20 regular funds and $350,083.75 Public Works funds; a total
of $948,077.29 was for new work and $845,922.39 for maintenance.
The expenditures were $1,427,336.82 regular funds and $350,083.75
Public Works funds, a total of $1,777,420.57.
   Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1937, amounting to $93,593.08 as follows:
Accounts payable June 30, 1937                                   $16, 579. 11
Maintenance: Dredging in West River and Mill River channels by
contract, in progress, to be completed in September 1937-------  77, 013. 97

       Total____-                       _-93,
                        _--------------------                         593. 08
           RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                         113
  The sum of $74,000 can be profitably expended during the fiscal year
1939, as follows:
Maintenance :
   Dredging about 270,000 cubic yards in upper end of main channel,
      by contract-----------------------------------------------    $54, 000
    Dredging about 100,000 cubic yards in Quinnipiac River below
      Ferry Street, by contract___________-
                                 -___---------------                 20, 000

           Total for maintenance--_-__---------------                                 ----                     74, 000

                                   Cost and financial summary
                                  ---------------------------
Cost of new work to June 30, 1937__                              1$1, 279, 702. 95
Cost of maintenance to June 30, 1937-- -------------------------      878, 492. 39

      Total cost of permanent work to June 30, 1937                         ------------              2, 158, 195. 34
Minus accounts payable June 30, 1937__________-----------                                                 16, 579.11

      Net total expenditures --------------------------------                                     1   2, 141, 616. 23
Unexpended balance June 30, 1937                                                                          93, 593. 08

        Total amount appropriated to June 30, 1937                    --      -           ---      1 2, 235, 209. 31

        Fiscal year ending June 30             1933           1934            1935              1936            1937

Cost of new work_____     ___ __    _______ - _____.- $170, 909. 51 $177, 125.76               ,,
                                                                                  $2, 740. 80 --    _ 0-
Cost of maintenance____________________    $18,040.04 _-_____ _      _         ___ _ . --. _-- $49,986.03
Total expended___________________________    16, 766. 00   161, 336. 87    172, 270.26        16, 939. 83      32, 943. 71
Allotted _______________________________    -3, 007. 88    292, 000. 00     60, 000. 00      146, 083. 75    -21, 000. 00


Balance unexpended July 1, 1936-------------------------                                                147, 536. 79
Deductions on account of revocation of allotment---------- -----                                         21, 000. 00

      Net amount to be accounted for-----------------                                --------           126, 536. 79
Gross amount expended------------------------------_                                 ---------           32, 943. 71
     Balance unexpended June 30, 1937-----------------------                                                93, 593. 08
Amount covered by uncompleted contracts ----------------------                                              71, 768. 40

        Balance available June 30, 1937----------------------                                               21, 824. 68
Amount that can be profitably expended in fiscal year ending
   June 30, 1939, for maintenance 2________________________                                                 74, 000. 00
   1Includes $350,083.75 Public Works funds.
   2 Exclusive of available funds.

                               22. MILFORD HARBOR, CONN.

  Location.-This harbor is on the north shore of Long Island Sound,
about 8 miles west of New Haven Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 219.)
  Previous projects.-Adopted by acts of June 23, 1874, June 18.
1878, June 14, 1880, and August 2, 1882. The cost and expenditure,
prior to the adoption of the existing project in 1902, were $42,340.44
for newv work and $3,159.56 for maintenance, a total of $45,500. For
further details, see Annual Report for 1915, page 1756.
  Existing project.-This provides for two riprap jetties 510 and 250
feet in length on the east and west sides, respectively, of the entrance
to the river; a channel across the bar and through the lower harbor
10 feet deep and 100 feet wide to Merwins wharf, a distance of
114      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

about 3,000 feet; an anchorage basin of the same depth, of about 6
acres in area, on the east side of the channel; a channel 8 feet deep
and 100 feet wide, widened at bends and at the upper end, from
Merwins wharf to 400 feet above the town wharf, about 3,000 feet;
and for an anchorage basin west of the channel inside of the entrance
2,000 feet long and 7.8 acres in area, 10 feet deep in the lower 600
feet and 8 feet deep above. The plane of reference is mean low
water. The mean tidal range is 6.2 feet, and the extreme range, due
to the combined effects of wind and other causes, is 10 feet or more.
   The estimate of cost for new work, revised in 1937, is $94,500,
including $15,500 to be contributed by local interests, but exclusive
of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $3,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1874, provided for the east jetty at
the mouth of the river (H. Ex. Doc. No. 107, 42d Cong., 3d sess., and
Annual Report for 1873, p. 1042); the west jetty at the mouth of the
river was authorized October 16, 1879 (Annual Report for 1879, p.
342); the act of June 13, 1902, provided for the entrance channel and
the anchorage basin east of it (H. Doc. No. 280, 56th Cong., 1st sess.) ;
and the act of August 26, 1937, provided for the anchorage west of the
channel and made final provision for the present dimensions of the
channel above Merwins Wharf (H. Doc. No. 77, 75th Cong., 1st sess.).
The latest published map is in the last-named document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
modified the project subject to the condition that local interests (a)
contribute one-third the initial cost, but not to exceed $15,500; (b)
furnish assurance satisfactory to the Secretary of War that they will
provide and maintain a suitable public landing; and (c) furnish,
freer of cost to the United States, suitable spoil-disposal areas for new
work and for subsequent maintenance when and as required. Ar-
rangements have been made to meet these requirements.
   Terminal facilities.-There are three bulkhead wharves near the
entrance used in the oyster trade. The town wharf near the head of
navigation is open to public use and the Connecticut State Shell Fish
Commission operates a small wharf not open to the public. There are
also several yacht landings. The facilities are ample for existing
traffic.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 25
percent completed. The jetties were completed in 1880 and the en-
trance channel in 1905. The channel through the river has been
dredged 6 feet deep to 500 feet above the town wharf. Two and one-
half acres of the east-side anchorage have been dredged 10 feet deep
and an anchorage 1.6 acres in area dredged on the west side of the
channel to compensate for the area of the eastern basin not dredged
on account of ledge rock. The head of navigation is 1 mile from the
head of the bay. The jetties are in fair condition. The controlling
depths at mean low water are 10 feet to Merwins Wharf, thence about
3 feet to the town wharf, thence not over 2 feet to the head; in the
eastern anchorage, 5 to 10 feet, and in the western, 3 to 10 feet; all as
determined in 1936. To complete the project requires the deepening of
the channel above Merwins Wharf and the deepening of the anchor-
age west of the channel. The costs and expenditures under the exist-
            RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                                     115
ing project have been $23,617.33 for new work and $26,671.22 for
maintenance, a total of $50,288.55.
   Proposed operations.-There are no funds available and no opera-
tions are contemplated during the fiscal year 1938.
   The sum of $31,000, together with $15,500 to be contributed by local
interests, can be profitably expended during the fiscal year 1939 by
contract in completing the 8-foot channel above Merwins Wharf and
the anchorage basin 10 feet and 8 feet deep west of the channel.
                                      Cost and financial summary
Cost of new work to June 30, 1937_________----------------------- $65, 957. 77
Cost of maintenance to June 30, 1937--------------------------29, 830. 78

      Total cost of permanent work to June 30, 1937____-______                                                          95, 788. 55
Net total expenditures___-------------------------------------                                                          95, 788. 55
Total amount appropriated to June 30, 1937    ______________                                                            95, 788. 55

        Fiscal year ending June 30                     1933              1934               1935             1936           1937


Cost of new work          ---           ---------         ------------          ---------------             ---------   ------------
Cost of maintenance---                               $4, 477. 07
                                              ..----------------   $3, 793. 68                $17. 79

                             -
Total expended _______________.--             __      2, 208. 60     6, 062. 15                   17. 79
Allotted_         __-----------------------------9,    9949. 67    -1, 678. 92                    17. 79_


Amount (estimated) required to be appropriated for completion of
  existing project         -------------------                                                                      $31,000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work -------------       -------------------                                                         31, 000. 00
  1In addition, $15,500 is to be contributed by local interests.

                                23. HOUSATONIC RIVER, CONN.

  Location.-Rises in northwestern Massachusetts, flows southerly 130
miles through Massachusetts and Connecticut, and empties into Long
Island Sound at Stratford, 5 miles east of Bridgeport Harbor. See
U. S. Coast and Geodetic Survey Chart No. 219.)
   Existing project.-This provides for a channel 18 feet deep at
mean low water and 200 feet wide from the mouth to the lower end
of Culvers Bar, about 5 miles, and thence 7 feet deep and 100 feet
wide to Derby and Shelton, about 8 miles; a riprap breakwater at
the mouth, consisting of an inner arm 3,250 feet long, 3 feet high
above mean low water, top width 6 feet, side slopes 1 on 1, and an
outer arm 2,500 feet long, 6 feet high above mean high water, top
width 12 feet, outer slope 1 on 2, inner slope 1 on 1; a riprap dike in
the river below Stratford not to exceed 1,500 feet in length; and a
riprap jetty 163 feet long at Sow and Pigs Rocks. The mean tidal
range, exclusive of the winter season and freshets, is 6.4 feet at the
mouth, 5.4 feet at Stratford, and 5.1 feet at Shelton; the extreme
range due to combined effect of wind and other causes is about 11
feet at the mouth, diminishing toward the head. The spring freshets
occasionally rise to a height of 18 feet or more above summer low
water, but only average about 12 feet above that datum.
   The estimate of cost for new work, revised in 1928, is $810,000, of
which $150,000 is to be contributed by local interests. The latest
(1930) approved estimate for annual cost of maintenance is $19,000.
116     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1871, provided for a jetty at Sow
and Pigs Reef and the present width of the channel across the outer
bar (H. Doc. No. 95, 41st Cong., 3d sess., and Annual Report for
1871, p. 781); act of August 11, 1888, provided for the breakwater
at the mouth and for the present dimensions of the river channel
above the lower end of Culvers Bar (S. Doc. No. 103, 50th Cong.,
1st sess., and Annual Report for 1888, p. 554). The construction
of the Stratford dike, in accordance with the project submitted by the
district engineer officer July 15, 1892, was authorized by departmental
action. The act of July 3, 1930, made final provision for the present
channel dimensions up to Culvers Bar (H. Doc. No. 449, 70th Cong.,
2d sess.). The latest published map is in the last-named document.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
authorized the 18-foot channel up to Culvers Bar subject to the pro-
vision that no work shall be started until local interests have con-
tributed $150,000 toward the cost of the work, and provided further,
that local interests shall furnish, free of cost to the United States,
suitable bulkheaded areas for the deposit of dredged material, or in
lieu thereof an additional $50,000 in cash. These conditions have not
been complied with, but spoil areas have been secured and the pro-
vision of more than one-half of the necessary funds assured.
   Terminal facilities.-There are three wharves for commercial use
at Stratford, one at Devon, and eight at Shelton and Derby. The
facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
under contract in progress from November 10, 1936, to January 7,
1937, restored the channels through the river bars by the removal
of 55,750 cubic yards of material. The costs were $15,309.39, all for
maintenance. Expenditures were $15,022.89.
   Condition at end of fiscal year.-The existing project is about 29
percent completed. The up-river channels were completed in 1893.
The breakwater at the mouth is completed except that the outer arm
has a top width of 8 feet and outer slope of 1 to 11/2 instead of the
respective project dimension; the Stratford dike is 1,255 feet long,
and the jetty at Sow and Pigs Rocks is completed. The dike and
jetty are in fair condition. The breakwater is in good condition.
The bar channels have been maintained to depths of 7 feet. The
controlling depth on June 30, 1937, was nearly 7 feet at mean low
water up to Shelton. To complete the project requires the enlarge-
ment of the outer arm of the breakwater to provide a top width
of 12 feet and an outer slope of 1 on 2, which is not required at this
time, the extension of the Stratford dike not more than 245 feet, and
the deepening and widening of the channel from the mouth up to the
lower end of Culvers Bar. The costs and expenditures have been
 $234,364.92 for new work and $202,916.73 for maintenance, a total of
 $437,281.65.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1938.
   The sum of $21,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging by contract through the river
bars, removing about 70,000 cubic yards of sand.
             RIVERS AND HARBORS-PROVIDENCE,                                            R. I., DISTRICT                      117
                                            Cost and financial summary

Cost of new work to June 30, 1937------------------------------                                                   $234, 364. 92
Cost of maintenance to June 30, 1937----------------------------                                                   202, 916. 73

       Total cost of permanent work to June 30, 1937--------------437, 281. 65
Net total expenditures----------------------------------------    437,281. 65
Total amount appropriated to June 30, 1937----------------------  437, 281. 65

           Fiscal year ending June 30                      1933          1934           1935             1936           1937

Cost of new work ._--------------------
Cost of maintenance .             .-------------------   $9, 574. 67   $3, 496. 84        $30. 20    $12, 060. 41     $15, 309. 39

Total expended.....------------------------8, 177. 68                   3, 296. 60        216. 64     12, 377. 11      15, 022.89
Allotted.......-----------------------------7,              081. 59     3, 496. 84    12, 416.40      15, 000. 00       .

Balance unexpended July 1, 1936 ___---------------------------                                                    $15, 022. 89
Gross amount expended----------------------------       --                                                         15, 022. 89

Amount (estimated) required to be appropriated for completion of
existing project _---------------------------------------------  425, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------------------------       ---       21, 000. 00
   I   In addition, $150,000 is to be contributed by local interests.

                                 24. BRIDGEPORT HARBOR, CONN.

  Location.-On the north shore of Long Island Sound, about 57
miles east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 220.)
  Previous projects.-Adopted by the Rivers and Harbors Acts of
July 4, 1836, March 3, 1871, and (for Black Rock Harbor) July 5,
1884. The cost and expenditures prior to operations in 1900 under
the project of 1899, were as follows:

                                                                                New work       Maintenance            Total

Bridgeport Harbor-....            ..                          _               $311, 899. 53   $5, 948. 97
                                                                    .-----------------------------------             $317, 848. 50
Black Rock Harbor_-----......   .--------..------                  ___.         66, 550. 00    6, 000. 00              72, 550. 00
        Total ......---...............-            ---
                                     .. .............                     .     378, 449. 53        11, 948. 97       390, 398. 560



  For further details see page 1756 of Annual Report for 1915.
  Existing project.-This provides for-
   (1) Two riprap breakwaters, one about 3,190 feet long on the
easterly side, and one 2,110 feet long on the westerly side of the
entrance to the main harbor.
   (2) The construction and maintenance of shore protection on
Fayerweather Island, including a sea wall connecting the northerly
and southerly portions of the island.
   (3) Main channel 25 feet deep and 300 feet wide, widened to with-
in 75 feet of the harbor line opposite the City Lumber Co. terminal,
from Long Island Sound to Stratford Avenue Bridge across the
Poquonock River.
118     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    (4) Three anchorage basins: One 25 feet deep and 29.4 acres in
area, opposite the inner breakwater; one 18 feet deep and 36 acres
in area, adjoining the main channel on the west above the inner
breakwater; and one 12 feet deep, in two areas, aggregating 14 acres
to the east of the main channel.
    (5) Poquonock River Channel, 18 feet deep and from 125 to 200
feet wide, from the lower bridge to a point about 500 feet below the
dam at Berkshire Avenue, about 1.1 miles.
    (6) Yellow Mill Channel, 18 feet deep and 150 to 200 feet wide
from the 18-foot anchorage to a point about 370 feet from Crescent
Avenue, about 1 mile.
    (7) Johnsons River Channel, 18 feet deep and 150 to 250 feet wide
from the 25-foot anchorage to a point 600 feet below Hollisters Dam,
about 1 mile.
    (8) Black Rock and Cedar Creek Channel, 18 feet deep and 100
to 200 feet wide, from the 18-foot curve in Black Rock Harbor to the
heads of both branches of Cedar Creek, about 2.4 miles.
    (9) Burr Creek Channel, 7 feet deep and 100 feet wide, from its
junction with Cedar Creek Channel to the south side of Yacht Street
extended, about one-quarter mile.
    All depths refer to mean low water, the mean tidal range being
6.4 feet. The extreme tidal range, due to wind and other causes, is 11
feet or more.
    The estimate of cdst for new work, revised in 1937, is $1,410,000, of
which $39,000 is to be contributed by local interests, exclusive of
amounts expended under previous projects. The latest (1937) ap-
proved estimate for annual cost of maintenance is $28,000.
    The existing project was authorized by the following river and
harbor acts: The act of July 4, 1836, provided for the Fayerweather
Island sea wall; the act of March 3, 1899, provided for the shore pro-
tection of Fayerweather Island (Annual Report for 1899, p. 1173);
the act of March 2, 1907, provided for the west breakwater and the
present dimensions of the east breakwater (H. Does. Nos. 275 and
521, 59th Cong., 2d sess.) ; the act of March 2, 1919, provided. finally
for the present project dimensions of the 18- and 12-foot anchorage
basins and the project depth of Burr Creek Channel (H. Doc. No. 898,
63d Cong., 2d sess.) ; the act of July 3, 1930, made final provisions for
the present project dimensions of the 25-foot entrance channel, the
25-foot anchorage, the channels through the Poquonock River, Yel-
low Mill Pond, Johnsons River, Black Rock Harbor, and Cedar
Creek (H. Doc. No. 281, 71st Cong., 2d sess.); the act of August
26, 1937 provided for the 25-foot channel through the main harbor
  (H. Doc. No. 232, 75th Cong., 1st sess.). An act approved August
12, 1937 (Public No. 276, 75th Cong.) made final provision for the
extent of the Burr Creek Channel. The latest published maps are in
the two last-mentioned documents.
    Local cooperation.-The River and Harbor Act of July 3, 1930,
required as a condition precedent to work on the Johnsons River
Channel that local interests contribute one-half ($39,000) of the esti-
mated cost of that work. This condition has not been met. Pre-
liminary surveys and studies for the development of the contiguous
       RIVERS AND HARBORS-PROVIDENCE,           R. I., DISTRICT    119
territory have been made, but financial arrangements have not been
completed.
   Terminal facilities.-The total length of berthing space available
is 17,700 feet. While the existing wharves appear to be adequate
for the present commerce, increased terminal and transfer facilities
are desirable to serve the increased commerce to be expected by a
rapidly growing municipality. (For further details see Port Series
No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance dredging
under contract in progress from November 2, 1936, to January 16,
1937, restored the Poquonock River Channel by the removal of
79,936 cubic yards of material. The costs for this dredging were
$30,237.72, applied to maintenance. Another contract, in progress
from November 2, 1936, to April 24, 1937, restored the channel
through Black Rock Harbor by the removal of 51,002 cubic yards
and the Cedar Creek channels by the removal of 70,814 cubic yards.
The costs for this dredging were $33,722.26, all for maintenance. The
total costs were $63,959.98, applied to maintenance, and the total
expenditures were $63,002.01.
   Condition at end of fiscal year.-The existing project is about 73
percent completed. The Cedar Creek Channel has been completed,
and the Black Rock and Yellow Mill Channels practically completed.
The 25-foot anchorage and the entrance channel have been completed.
The other harbor channels and basins have been dredged to the
dimensions previously authorized. The breakwaters were completed
in 1908. The anchorage basins and channels are in fair condition.
The breakwaters at the entrance and the shore-protection works on
Fayerweather Island are in good condition; and the Fayerweather
Island breakwater and sea wall need repairs. To complete the
project requires the deepening of the channels in Johnsons River,
Poquonock River and in the main harbor; and the rock removal
in Yellow Mill and Black Rock Channels.
   The controlling depths at mean low water are: Main channel to
just inside the inner breakwater, 25 feet as determined in 1933, and
thence through the main harbor on the previous alinement about 15
feet to the lower bridge, as determined in 1936; Poquonock River,
nearly 19 feet, to Black's coal wharf, and thence to the head of the
improved channel, nearly 13 feet, as determined in 1937; Yellow
Mill Channel, about 17 feet, not full width, nearly to the head of the
improved channel except for rocky shoal on east side near upper end,
as determined in 1936; Johnsons River, 12 feet to the first bend at
the entrance to the river, and thence nearly 10 feet to the head of the
channel, as determined in 1929; Black Rock Harbor (not full width),
18 feet; Cedar Creek, 18 feet to the head of the West Branch and
nearly 18 feet to the head of the East Branch, as determined in 1937;
Burr Creek, about 31/2 feet to its head, as determined in 1923; an-
chorage basins, 20 to 26 feet, 16 to 18 feet (old alinement), and 4 to
12 feet (old alinement), respectively.
   Costs and expenditures have been $1,032,868.67 for new work and
$342,434.57 for maintenance, a total of $1,375,303.24.
120            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1937, amounting to $6,210.02, together with
$20,000 allotted in September as follows:
New work: Improvement dredging in Poquonock River, by contract,
during the year, about 50,000 cubic yards__________      _________ $20, 000. 00
Maintenance :
   Reserved for settlement of claim under contract for maintenance
      dredging in Black Rock Harbor and Cedar Creek                   4, 987. 82
   Maintenance contingencies throughout the year.-----------.____      1,222. 20
          Total --------------                                     ____-------                                                          26, 2t0. 02
  The sum of $222,500 can be profitably expended during the fiscal
year 1939, as follows:
New work: Dredging channel through main harbor, by contract,
  about 875,000 cubic yards of mud, sand, and gravel ____________ $192, 500
Maintenance: Dredging Yellow Mill Channel, by contract, about
  150,000 cubic yards of mud -----------------------------------    30, 000
           Total               ----------------------------------------------                                                                 223, 500
                                                   Cost and financial summary
Cost of new work to June 30, 1937--------------------------$1,                                                                         411,318 20
Cost of maintenance to June 30, 1937____
                                      --            _____---354,                                                                           383. 54
          Total cost of permanent work to June 30, 1937                                                                              , 765, 701. 74
                                                                                                                                    1-----------

Net total expenditures--------------                                                                                                   765, 701. 74
                                                                                                                                    1---------------------,
Unexpended balance June 30, 1937-- ----------------------                                                                                 6, 210. 02

          Total amount appropriated to June 30, 19371__-__-_____                                                                    1, 771, 911.76

          Fiscal year ending June 30                                    1933             1934             1935                 1936              1937


Cost of new work_ -        -    -    -         -- ___-        .-   _     987.
                                                                         5$171,52   $15, 153. 71--.....      --   ---....---          ----.
Cost of maintenance         --..........----             ..            5, 055. 63   ..----------          $157. 77     $12, 472. 23            $63, 959.98
       Total cost ...... -           _-....__...........           177, 043. 15      15, 153. 71           157. 77       12,472. 23             63, 959. 98
Total expended......... .................                          168, 708. 59      30, 766. 10            78. 72       13, 580.32             63, 002. 01
Allotted....._............................                         171, 882. 52        6, 026. 21    29, 871. 07         53, 000. 00 ...........


Balance unexpended July 1, 1936------------------        ---------                                                                    $69, 212. 03
Gross amount expended ---------------------------------------                                                                          63, 002. 01

    Balance unexpended June 30, 1937__                                                                ---------                              210. 02
                                                                                                                                      -6, 6-------
                                        -----------
Amount covered by uncompleted contracts________                                                                                           4, 987. 82

     Balance available June 30, 1937-                     .------                                                                             1, 222. 20
Amount allotted from War Department Civil Appropriation Act,
approved July 19, 1937------------------------------------                                                                             20, 000. 00
          Balance available for fiscal year 1938_______-----------                                                                      21, 222. 20

Amount (estimated) required to be appropriated for completion
                        ---- - - - - - - - - - - - - --- --- --- --- - - -- - - --                                              -
of existing project 12                                                                                                               318, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1__--                                                                                                                        500.00
                                                                                                                                       1--------------92,
   For maintenance    ------         -----          -                                                                                   30, 000. 00
           Total -----.-                         -----------------------------                                                         222, 500. 00
   SExclusive of available funds.
   SIn addition, $39,000 is to be contributed by local interests.
       RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT             121
                    25. NORWALK HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, about 44
miles east of New York City. (See U. C. Coast and Geodetic Sur-
vey Chart No. 221.)
   Previous projects.-Adopted by River and Harbor Acts of June
10, 1872, June 3, 1896, and March 2, 1907. The cost and expenditures
were $162,516.81 for new work and $66,120.44 for maintenance, a
total of $228,637.25. For further details see page 1757 of Annual
Report for 1915.
   Existing project.-This provides for a channel 12 feet deep from
the outer harbor to the highway bridge at South Norwalk, about 31/s
miles, 200 feet wide to Dorlon Point, thence 150 feet wide to South
Norwalk, and 250 feet wide along the South Norwalk wharves; an
anchorage basin 10 feet deep and about 17 acres in area opposite
Fitch Point; a channel 10 feet deep and generally 100 feet wide from
South Norwalk to the head of navigation at Norwalk, about 1.5
miles; and for the maintenance of the channel 6 feet deep and 75
feet wide along the east side of the harbor to the head of navigation
at East Norwalk. The reference plane is mean low water, the mean
tidal range being 6.8 feet. The maximum range due to the combined
effect of wind and other causes is 12 feet or more.
   The estimate of cost for new work, revised in 1927, was $284,000,
exclusive of amounts expended on previous projects. The latest
 (1919) approved estimate for annual cost of maintenance is $8,000
for the first 3 years and $4,000 thereafter.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 1143, 63d Cong., 2d sess.). For the
latest published map see the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The facilities are considered adequate for the
existing commerce. The total length of berthing space available is
6,165 feet. (For further details see Port Series No. 18, Corps of
Engineers.)
   Operations and results during fiscal year.-Dredging under a con-
tract for maintenance was commenced on December 15, 1936, and
completed on February 27, 1937. The channel from Gregory Point
to Washington Street Bridge was restored to project dimensions by
the removal of 101,399 cubic yards of mud and the depths restored
in the 10-foot basin by the removal of 64,932 cubic yards of mud.
The costs were $27,891.14, all for maintenance and the expenditures,
$27,698.01.
   Condition at end of fiscal year.-The project was completed in
1929 at a saving of $27,310 under the estimated cost. The controlling
depths at mean low water are: To Gregory Point, nearly 12 feet, as
determined in 1935; and thence to Washington Street Bridge at
South Norwalk, 12 feet; in the anchorage basin, 10 to 12 feet; and in
the East Norwalk Channel about 6 feet nearly to the head, all as
determined in 1937; and between South Norwalk and Norwalk, 10
feet, as determined in 1935. The head of navigation is at Norwalk.
The costs and expenditures under the existing project have been
$256,689.72 for new work and $155,568.33 for maintenance, a total of
$412,258.05.
 122           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1937, amounting to $108.86, together with $6,500
allotted in July as follows:
Accounts payable, June 30, 1937-________________-__________-_____     $3. 20
Maintenance dredging in East Norwalk Channel, by contract, August-
  September 1937, about 19,000 cubic yards of mud ___________---   6,605. 66

           Total                                                                                                                   8. 86
                                                                                                                             6,, 6--08--------------------
  The sum of $39,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging in the Norwalk River Channel, by
contract, about 150,000 cubic yards of mud and sand.
                                          Cost and financial summary
Cost of new work to June 30, 1937_______________________________                                                      $419, 206. 53
Cost of maintenance to June 30, 1937------____-----------                                                              221, 688. 77
      Total cost of permanent work to June 30, 1937                                                                    6-------------640,
                                                                                                                             895. 30
Undistributed costs June 30, 1937---      _3.   ___-                                                                               20

      Net total cost to June 30, 1937-----------------------------                                                     640, 898. 50
Minus accounts payable June 30, 1937-            ----
                                           __--------                                                                         3. 20
     Net total expenditures ----------------------------------                                                         640, 895. 30
Unexpended balance June 30, 1937_ .------------  ___----------                                                              108. 86
           Total amount appropriated to June 30, 1937-----------------                                                641, 004. 16

           Fiscal year ending June 30                      1933             1934           -1935               1936             1937

Cost ofnew work ....................     ............ I............   ............ I  ............
Cost of maintenance ------------------
                                     . . $11, 869. 66 ------------ $43, 350. 00 __-------                                     $27, 891. 14
Total expended     -----------------------............................
                                                       11, 869. 66        _------------__ 43, 350. 00          $193. 13        27, 698. 01
Allotted                __        .........
                   ---------------------                 11, 241. 16     $43, 000. 00        350.00          62, 000. 00     -34, 000.00


Balance unexpended July 1, 1936__--_____________ -____--
                                                    ___--       $61, 806. 87
Deductions on account of revocation of allotment---------------34, 000. 00

      Net amount to be accounted for------------------------                                                               27, 806. 87
Gross amount expended _______         -__
                                   _______________           -                                                             27, 698. 01
    Balance unexpended June 30, 1937 _________         -                                                -_______               108. 86
Amount covered by uncompleted contracts ------- ___--__                                                       -___-              3. 95
     Balance available June 30, 1937_-------               ___                                           -            -________
                                                                                                                           1-- 91
                                                                                                                          104.
Amount allotted during July 1937-----------------------------6,                                                            500. 00
           Balance available for fiscal year 19386__                                    -__-________             _          6, 604. 91
  mount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1 - - -- - -   -
                                          ______
                                                -
                                                    ____
                                                       __
                                                                 -
                                                             ___ __                                                        39, 000. 00
  1 Exclusive of available funds.

                             26. FIVEMILE RIVER HARBOR, CONN.

  Location.-On the north shore of Long Island Sound about 41
miles to the east of New York City. (See U. S. Coast and Geodetic
$urvey Chart No. 221.)
EXrsting project.-This provides for a channel 8 feet deep, 100 feet
wide, and 6,000 feet long. The plane of reference is mean low water,
         RIVERS AND HARBORS-PROVIDENCE,                  R. I., DISTRICT     123
the mean tidal range being 7.2 feet and the extreme range, due to the
effects of wind and other causes, 12 feet or more.
   The estimate of cost for new work revised in 1928 is $46,000. The
latest (1894) approved estimate for annual cost of maintenance is
$1,000. The existing project was adopted by the River and Harbor
Act of August 11, 1888 (Annual Report for 1887, p. 639). For the
latest published map, see House Document No. 1419, Sixty-third
Congress, third session.
   Recommended modifications of project.-It is recommended that
the project be modified to omit all work above a point 3,800 feet
from the inner end of the entrance channel (H. Doc. No. 1419, 63d
Cong., 3d sess.).
    Terminal facilities.-There are several small wharves and piers.
The facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year.--Maintenance dredging
under contract was commenced June 2 and completed June 4, 1937.
The channel through the bar at the entrance to the river was dredged
to depth of 81/2 feet by the removal of 4,199 cubic yards of sand. The
costs for this work were $907.99, applied to maintenance, and the
expenditures $769.95.
    Condition at end of fiscal year.--The existing project is 77 percent
completed. A channel of project dimensions has been dredged about
5,300 feet up the harbor and thence 200 feet farther with widths
of 25 to 75 feet. The head of navigation is about 1 mile above the
mouth. The controlling depths as determined in 1937, are 9 feet to
opposite Butler Island Creek; thence along the wharves 61/2 feet,
diminishing to about 3 feet at the upper wharf. To complete the
project requires the completion of the upper 700 feet of channel.
The costs have been $35,490.44 for new work and $11,754.64 for
maintenafice, a total of $47,245.08. The expenditures have been
$47,162.29.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1937, amounting to $474.80, together with $22,000
allotted in July, as follows:
Accounts payable, June 30, 1937------ ------                       $85. 99
Maintenance dredging in river channel, by contract, September-
December 1937, about 64,000 cubic yards of mud----------------- 22,388. 81
       Total------------__---------------------------------------22,       474 80
  No additional funds can be profitably expended during the fiscal
year 1939 as the completion of the above work will place the improve-
ment in condition to meet the needs of navigation for several years.
                            Cost and financial summary
Cost of new work to June 30, 1937-------------------------            $35, 490. 44
Cost of maintenance to June 30, 1937-----------------------------      11, 754. 64
      Total cost of permanent work to June 30, 1937-------..----       47, 245. 08
Undistributed costs June 30, 1937---------------------------------           3. 20
      Net total cost to June 30, 1937 -----------------------------    47, 248. 28
Minus accounts payable June 30, 1937------------------------------          85. 99
     Net total expenditures-----              -------                  47, 162. 29
Unexpended balance June 30, 1937------------------                         474. 80

       Total amount appropriated to June 30, 1937-           ____      47, 637. 09
124           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30                              1933             1934             1935          1936               1937

                .---------- ---------
Cost of new work-----                                                       -   ---- ---     ---                                   ------
Cost of maintenance-----      ---------                  ------                 -----      --------------------- $907.99
Total expended------- ---------                 --            ---------------------------                          $55.25             769.95
Allotted........           ------------------------------------..........                     $3, 000. 00 ......------------        1, 700. 00


Balance unexpended July 1, 1936 ---------------------------                                                                    $2,944. 75
Deductions on account of revocation of allotment---                                                                                700. 00
                                                                                                                                1---------1,

      Net amount to be accounted for-        -                                                                  ---              , 244. 75
                                                                                                                                1----
                         --
Gross amount expended _--_        ----------                                                                                       769.95
     Balance unexpended June 30, 1937------------------------                                                                      474. 80
Amount covered by uncompleted contracts ------------------------                                                                    85. 99
    Balance available June 30, 1937---------------------------      388. 81
Amount allotted during July 1937___---------------------------- 22, 000. 00

         Balance available for fiscal year 1938 ---                                      __-_____----
                                                                                                 ----                          22, 388. 81

Amount (estimated) required to be appropriated for completion of
existing project 1 --------------    -------------------------                                                             10, 500. 00
   1"Exclusive of available funds.

                                  27. STAMFORD HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, 36 miles
east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 221.)
   Previous projects.-Adopted by the acts of August 5, 1886, and
July 13, 1892. The cost and expenditures on these projects were
$135,142.85 for new work and $59,419.99 for maintenance, 'a total of
$194,562.84. For further details see page 1758 of annual report for
1915.
   Existing project.-This provides for two detached breakwaters.
o'ne 1,200 feet long on the easterly side, and one 2,900 feet long on
the westerly side of the channel at the entrance to the harbor; an
entrance channel 18 feet deep, 200 feet wide to the upper end of the
18-foot anchorage, about 0.55 mile, and thence 15 feet deep to the
junction of the branches, about 0.5 mile; a channel in the west
branch 15 feet deep, 125 feet wide, and about three-fourths mile
long, and a basin of the same depth at the head of the branch of
such widths as to exclude extensive rock excavation along the north-
east side; a channel in the east branch 12 feet deep and 100 feet wide,
with increased width at the turns, to a point 1,100 feet from the head
of navigation, thence of the same depth and from 85 to 125 feet
wide to the head of navigation, a total distance of about 1.5 niles;
an anchorage basin 18 feet deep on the west side of the 18-foot en-
trance, 600 feet wide, and 1,000 to 1,900 feet long, and an anchorage
area 8 feet deep east of the entrance channel north of buoy no. 6,
about 17 acres. The plane of reference is mean low water, the mean
tidal range being about 7.3 feet. The extreme tidal range, due to
the combined effects of wind and other causes, is 12 feet or more.
   The estimate of cost for new work, revised in 1937, is $907,000,
including a conditional contribution of $180,000, to be made by
       RIVERS AND HARBORS-PROVIDENCE,           R. I., DISTRICT    125
local interests, but exclusive of amounts expended on previous proj-
ects. The latest (1937) approved estimate for annual cost of main-
tenance is $20,900.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1919, provided for the east branch
channel and the present project width of the entrance channel (H.
Doc. No. 1130, 63d Cong., 2d sess.); the act of August 30, 1935, pro-
vided for the 8-foot anchorage area, the present project depth of the
upper portion of the entrance channel, and the present project dimen-
sions of the west branch channel and basin (Rivers and Harbors
Committee Doc. No. 8, 74th Cong., 1st sess.); the act of August 26,
1937, provided for the breakwaters, the 18-foot anchorage basin and
made final provisions for the depth of the outer section of the en-
trance channel (Rivers and Harbors Committee Doc. No. 29, 75th
Cong., 1st sess.). For the latest published map, see the last-named
document.
   Local cooperation.-The conditions of local cooperation imposed
by the River and Harbor Act of March 2, 1919, have been fully com-
plied with. The River and Harbor Act of August 30, 1935, contained
the provision that the anchorage area shall be dredged only after
local interests contribute one-half of the first cost thereof. This re-
quirement has not been met, and no assurance has been received that
it may be expected. The River and Harbor Act of August 26, 1937,
authorized the breakwaters, the 18-foot anchorage basin and the
18-foot channel to the upper end of the basin subject to the provisions
that local interests either contribute one-third the entire costs of the
proposed improvements or contribute one-third the cost less $50,000
and in addition provide the proposed 18-foot anchorage basin west
of the entrance channel. The above requirements will be met. Plans
are being formulated but the date when the requirements will be met
cannot be definitely fixed at the present time.
    Terminal facilities.-The total length of berthing space available
is 6,015 feet. The facilities are considered adequate for the existing
commerce. (For further details see Port Series No. 18, Corps of
Engineers.)
    Operations and results during fiscal year.-Contract dredging for
the improvement of the entrance and west branch channels and the
west branch basin was commenced March 11, 1937, suspended May 1
to June 5 and again on June 20. During progress 128,915 cubic
yards of ordinary material and 7 cubic yards of boulders were re-
moved from the entrance channel; 119,331 cubic yards of ordinary
material and 394 cubic yards of boulders from the west branch chan-
nel; and 31,033 cubic yards of ordinary material and 162 cubic yards
of boulders from the basin, completing except for several rocky areas
the channels and about 15 percent of the basin. The costs for this
work were $81,927.22 all for new work, and the expenditures were
 $69,876.53.
    Condition at end of fiscal year.-The project is about 28 percent
completed. The east branch channel has been completed except for
a shght deficiency in width opposite Ludlow Street. Except for
isolated rocky shoal areas the entrance and west branch channels have
been dredged to 15 feet and a portion of the basin similarly deepened.
The controlling depths at mean low water are: In the east branch,
126               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

nearly 11 feet (not full width); in the entrance channel and west
branch, to the basin, 13 feet (over rocky shoals); as determined in
1937; in the basin 7 to 10 feet, as determined in 1936; and in the
anchorages, 31/2 to 14 feet, as determined in 1934. To complete the
project requires a slight widening (not essential to navigation) in
the east branch channel opposite Ludlow Street, the construction of
the breakwaters, the deepening of portions of the entrance channel
and the west branch channel and basin, and the dredging of the
18- and 8-foot anchorages. Costs have been $270,342.16 for new
work, and $112,559.05 for maintenance, a total of $382,901.21, and the
total expenditures $370,850.52.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1937, amounting to $55,123.47, together with ac-
counts receivable of $14.73 and $30,000 allotted in July as follows:
Accounts payable, June 30, 1937-----           _ ____---------- $12, 164. 96
New Work: Dredging in West Branch Channel and basin under con-
  tract in progress, to be completed in September 1937__----------- 42, 973. 24
Maintenance: Dredging about 90,000 cubic yards in East Branch
  Channel, by contract, September to December 1937------------- 30, 000. 00

            Total---------------------------------------                                  ----        85, 138.20
  The sum of $64,000 can be profitably expended during the fiscal
year 1939 in the completion of the 15-foot portion of the project for
the removal, by contract, of rocky areas remaining in the basin and
rocky shoals found in the 15-foot channel. As to the completion
of the 18-foot channel and anchorage basin and the breakwaters,
authorized by the act of August 26, 1937, the fulfillment of conditions
of local cooperation cannot be definitely fixed at the present time.
                                          Cost and fitan cial summary

Cost of new work to June 30, 1937------------                                                       $405, 485. 01
Cost of maintenance to June 30, 1937----------------------------171, 979. 04
      Total cost of permanent work to June 30. 1937-------                                           577, 464. 05
Undistributed costs June 30, 1937------------------------------                                            99. 54

      Net total cost to June 30, 1937_----------------------                                         577, 563. 50
Plus accounts receivable June 30, 1937 ---------------------------                                         14. 73

     Gross total costs to June 30, 1937---------------------  577, 578. 32
Minus accounts payable June 30, 1937----__--------------------12, 164. 96

      Net total expenditures--------------------------------                                         565, 413. 36
Unexpended balance June 30, 1937---------------------------                                           55, 123.47
            Total amount appropriated to June 30, 1937-------------                                  620, 536. 83

           Fiscal year ending June 30               1933         1934         1935           1936           1937

Cost of new work--               -------------------------------------------------------                  $81, 927. 22
Cost of maintenance.                        -    $34, 695. 66 $8, 840. 39 $4, 594. 63
Total expended ---...........   ..   ......   -   34, 193. 69   5, 378. 01   8, 057. 01          .-----    69, 876. 53
Allotted      ...-----------------------          31, 741. 28   9, 996.02    3,439.00                     125,0 00
         RIVERS AND HARBORS-PROVIDENCE,                        R. I., DISTRICT     127
Amount allotted from War Department Appropriation Act approved
  May 15, 1936--------------------------------------------- $145,000.00
Deductions on account of revocation of allotment---                000. 00
                                                               20-----------20,

      Net amount to be accounted for _______-----------------               125, 000. 00
Gross amount expended----------------------------           $69, 887. 11
Less reimbursements collected ________ _ ___-------               10. 58
                                                                             69,876.53

     Balance unexpended June 30, 1937------------------------                55, 123.47
Amount covered by uncompleted contracts__----------------- ---               55, 123.47

Accounts receivable----------------------------------------------                 14.73
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937----------------------------------------             30, 000.00

     Balance available for fiscal year 1938--_-----------_-------            30, 014.73
Amount (estimated) required to be appropriated for completion of
  existing     project 1      -------   _______--___                        413, 700. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work --                                                   6________,____
                                                                             64,000.00
  'Exclusive  of available funds.
  2 In addition $180,000 is to be contributed by local interests.

                           28. GREENWICH HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, about 30
miles east of New York City. (See U. S. Coast and Geodetic Survey
Chart, No. 222.)
   Previous projects.-Adopted by River and Harbor Act of June 3,
1896. The costs and expenditures were $17,017.19 for new work and
$12,906.51 for maintenance, a total of $29,923.70.
   Existing project.-This provides for a channel 12 feet deep, 130
feet wide through the outer harbor, about 0.8 mile and 100 feet wide
along the wharf front to a point 500 feet from the head of the harbor,
nearly 0.5 mile. The plane of reference is mean low water, the mean
tidal range being 7.5 feet, and the extreme range due to the combined
effect of wind and other causes, 12 feet or more.
   The estimate of cost for new work, made in 1919, was $49,000, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $2,250.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 289, 63d Cong., 1st sess). For the latest
published map, see the project document.
   Terminal facilities.-The total length of berthing space available,
exclusive of yacht landings, is about 1,300 feet. The facilities are
considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1924 at a saving of $11,704 under the estimated cost. The
controlling depth as determined in 1935 was 11 feet to the head of
the dredged channel. The costs and expenditures under the project
have been $37,295.45 for new work and $30,263.39 for maintenance, a
total of $67,558.84.
   Proposed operations.--No funds are available and,no operations
are contemplated during the fiscal year 1938.

       20196-37-pt. 1-9
128              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The sum of $32,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging by contract in the channel re-
moving about 115,000 cubic yards of mud and sand.
                                                Cost and financial summary

Cost of new work to June 30, 1937_______________________________ $54, 312. 64
                                                     -
Cost of maintenance to June 30, 1937 __________________-- -    __ 43, 169. 90
      Total cost of permanent work to June 30, 1937 _    -----____ -97, 482. 54
Net total expenditures-----------------------------------------      97, 482. 54
Total amount appropriated to June 30, 1937--     _______________     97, 482. 54

           Fiscal year ending June 30                               1933            1934           1935            1936             1937


Cost of new work...----------------------                                        ---------------------------------------
Cost of maintenance ... -----------------                                             ---    -----
Total expended--------------------------------------                             ---------     -----------     ------------ ------------
Allotted------------------ ---------------- -$1, 017. 34...


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance____--- --- -   ________---_---   _                                                                   $32, 000
    29. EXAMINATIONS,                           SURVEYS, AND CONTINGENCIES                                         (GENERAL)

  The cost of the work during the year amounted to $58,665.12; the
expenditures were $71,090.51. The balance unexpended on June 30,
1937, amounting to $7,251.02, together with $27,000 allotted in July,
will be applied as needed during the fiscal year 1938 to payment of
expenses incurred under this heading.
  The additional sum of $45,000 can be profitably expended during
the fiscal year ending June 30, 1939.
                                                Cost and financial summary

Cost of new work to June 30, 1937____ -_______,_-----_________
Cost of maintenance to June 30, 1937 ..--                  $271, 052. 26
     Total cost of permanent work to June 30, 1937--------------                                                          271, 052. 26
Minus accounts payable June 30, 1937--___                                                                                     I,
                                                                                                                               006. 71
                                                                                                                            1_______-_________
     Net total expenditures_____________                                                                                  270, 045. 55
Unexpended balance June 30, 1937-____-   __,__--_______                                                _7,                     251. 02
           Total amount appropriated to June 30, 1937 _____________                                                       277, 296. 57

           Fiscal year ending June 30                              1933             1934           1935            1936             1937

Cost   of new    work--           -       --.

Cost of maintenance                   ..        ...
                                 ------------------.............. $17, 427. 20   $17,832.80     $33,504.29     $59, 136. 14     $58, 665. 12
Total expended----------------------...........................14, 355. 50        19, 338.01     33, 210. 61    45, 084. 27        71, 090. 51
Allotted.................----------------------------           29, 897.01       25, 568. 60     33, 676. 27    84,000.00          16, 654.69


Balance unexpended July 1, 1936__                                          _________________________                      $61, 686. 84
Amount           allotted       from War                Department               Appropriation            Act     ap-
    proved May 15, 1936------------------------------------------16, 654. 69
      Amount to be accounted for_                                                               __                            78, 341. 53
Gross amount expended--......                                          -------                    - $74,717.04
             RIVERS AND HARBORS-PROVIDENCE,                                 R. I., DISTRICT                    129
Less-
        Reimbursements collected--------------$3, 519. 74
        Receipts from sales--------------------   106. 79
                                                                                 $3, 626,. 53
                                                                                                    $71, 090. 51
      Balance unexpended June 30, 1937---------------       ---------                                   7, 251.02
Outstanding liabilities June 30, 1937-----------------------------                                      1, 782.90
     Balance available June 30, 1937------------------------                                            5,468. 12
Amount allotted from War Department Civil Appropriation                                   Act
approved July 19, 1937---------------------------------------                                         27,000.00

          Balance available for fiscal year 1938---------------------                                  32, 468. 12

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1----- __----_--_--_--------------_45,                                         000. 00
      1 Exclusive of available funds.

30. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                     [Commercial statistics for these projects are given in pt. 2 of report]


                                                               For last    Cost and expenditures
                                                                full re-      to June 30, 1937          Estimated
                      Name of project                          port see                                 amount re-
                                                               annual                                    quired to
                                                                report     New work      Mainte-         complete
                                                                 for-                    nance


1. Warren River, R. I.1__...............__.............__.       1890    $5, 000. 00 ------------...........
                                                                                                       (2)
2. Wickford Harbor, R. I.1_____---------------__ --
3. Pawcatuck River, R. I. and Conn.,------------
                                       ....                  _
                                                                  1900
                                                                  1933
                                                                          16, 300. 00  ---------.
                                                                        182, 835. 11 $119, 553.93
                                                                                                       (2)
                                                                                                       $64, 600
4. Harbor of Refuge, Point Judith, R. I.13.----------            1936 2,371,467.55 486, 208. 73       (2)
5. Great Salt Pond, Block Island, R. I.1 .-----                  1936  189, 036. 65    53, 173.03     370, 900
6. Stonington Harbor, Conn. 3           ----        ---          1919  337, 453. 83     6, 000.00         2, 500
7. Mystic River, Conn.1 _-----           --- 4 - -- -- ------ -- 1919
                                      ____-------                         48, 125 50        134. 50        2, 500
8. Connecticut River above Hartford, Conn. ..........
9. Southport Harbor i 3           _        _____        .
                                                                  1932
                                                                  1936
                                                                        116, 324. 81
                                                                        6 96, 633. 15
                                                                                        14, 373. 54
                                                                                         8, 931. 91
                                                                                                         5
                                                                                                    1, 000, 000
                                                                                                       (2)
10. Westport Harbor and Saugatuck River, Conn.--......
                                                  7-          -   1927    32, 104. 55    3, 360. 44        2, 800
11. Cos Cob Harbor and Mianus River, Conn. ........ 1904                  18, 935.19         64.81     (2)
12. Hay (West) Harbor, N. Y.1 -----------------------             1931     8, 401. 15 ............ (2)

  I Channels adequate for commerce.
  2 Completed.
  3 Maintenance of breakwaters not urgent.
  4 Awaiting local cooperation. Modification of conditions affecting lock and dam construction at Enfield
Rapids was authorized by the River and Harbor Act of Aug. 30, 1935.
  b Estimated cost of project $3,384,000; expenditures limited by law to $1,000,000.
  6 In addition $18,285 was expended from contributed funds of which $1,785 was for work outside the
appoved project.
  7Abandonment approved in 1905.
     31. PLANT ALLOTMENT FOR PROVIDENCE, R. I., DISTRICT
                          Cost and financial summary
Undistributed costs June 30, 1937------------------------------    $34, 778.07
Plus accounts receivable June 30, 1937----------------------------   8,057. 69
     Gross total costs to June 30, 1937_ ---------------                                 ___-42, 835. 76
Minus accounts payable June 30, 1937---------------                                               , 599. 81
                                                                                         - --- -1_____
     Net total expenditures----------------------------                               -------          41,235.95
Unexpended balance June 30, 1937---------------      ------                               __            5, 706. 95
           Total amount appropriated to June 30, 1937__------------__                                  46, 942.90

          Fiscal year ending June 30               1933         1934         1935           1936             1937


Total expended-..............------------------ -------...........
                                                                 196. 99
                                                               $7,                      $6, 788. 11      $27,250. 85
Allotted-.........    .-.....                          10, 769. 14
                            ...----......... ............                                 7, 173. 76      29, 000. 00
130        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936----------------------------            $3, 957. 80
Amount allotted from War Department Appropriation Act approved
May 15, 1936,---------------__ ----------------------------           29,000. 00
      Amount to be accounted for----------------------------           32, 957. 80
Gross amount expended------------------------- $95, 925. 10
Less:
    Reimbursements collected ------------   $68, 569. 25
    Receipts from sales--------------------      105. 00
                                                         68, 674. 25
                                                                       27, 250. 85

      Balance unexpended June 30, 1937----------------------       5, 706. 95
Outstanding liabilities June 30, 1937,----------------------------1, 688. 26
     Balance available June 30, 1937-----------------------             4, 018. 69
Accounts receivable June 30, 1937_--------                              8, 057. 69

       Unobligated balance available June 30, 1937 -_..                12,076. 38

            32. CONNECTICUT RIVER BASIN-FLOOD CONTROL

  Location.-The works covered by this project are a series of dams
and reservoirs on tributaries of the Connecticut River in Vermont
and New Hampshire within a radius of 230 miles from Hartford,
Conn., and dikes with appurtenant structures on the river bank at
East Hartford, Conn.
  Existing projects.-The project providing for a reservoir system
for the control of floods in the Connecticut River Valley, with inci-
dental benefits to power development, sanitation, and navigation, in-
volves the construction of 10 reservoirs on tributaries of the Con-
necticut River in accordance with plans in House Document No. 412,
Seventy-fourth Congress, second session, as the same may be revised
by the Chief of Engineers upon further investigation of the 1936
flood, at an estimated cost of $10,028,900 for construction and $3,-
344,100 for lands and damages. A project provides also for the con-
struction of dikes, drainage gates, pumping plants, and other facili-
ties at East Hartford, Conn., at an estimated cost of not to exceed
$658,000 for new work.
   The existing project for reservoirs was authorized by the Flood
Control Act of June 22, 1936, as amended by the act approved May
25, 1937 (Public No. 111, 75th Cong.). The project for dikes and
works at East Hartford, subject to approval by the Board of En-
gineers for Rivers and Harbors (report of district engineer dated
Apr. 30, 1934), was authorized by the River and Harbor Act of
August 30, 1934.
   Local cooperaton.--(See page 6.) The legislatures of the States
of Connecticut, Massachusetts, Vermont, and New Hampshire have
ratified a proposed agreement among these States to enter into a
compact under section 4 of the Flood Control Act, to appoint an
interstate compact conmmission, which will furnish the cooperation
required by the Flood Control Act, at the expense of the States, and
as provided for by the compact. This compact is to be formally
signed early in July by the designated representatives of the States
and then submitted to the Congress of the United States for approval.
   Oiperations and resu7lts during fical yea r.-There were no opera-
tions, costs, nor expenditures.
   Condition at end of fiecal year.-Work has not been started.
              RIVERS AND HARBORS-PROVIDENCE,                                   R. I., DISTRICT                       131
  Proposed operations.-The sum of $398,000, allotted during Au-
gust 1937, will be applied to engineering studies and surveys.
  No additional funds can be profitably expended during the fiscal
year 1939, due to nonfulfillment of conditions of local cooperation.
                                     Cost acrd financial sunimary

Cost of new work to June 30, 1937                      ------------------                          ---------
Cost of maintenance to June 30, 1937                                                               -------

         Net total expenditures___________________
Total amount appropriated to June 30, 1937_                                           ---------     -----------
Amount allotted during August 1937_                                                                 -- $398,000
      Amount available for fiscal year 1938_______                                                -398,              000

Amount (estimated)         required to be appropriated for completion of
   existing     project 1     _-        ___-_     --             -----------                         10, 028, 900
   2 Exclusive of available   funds.

   33. CONNECTICUT RIVER AT HADLEY, MASS.-BANK PROTECTION

   Location.-The work covered by this relief project is located on
the east bank of the Connecticut River, in the town of Hadley, Mass.
   Existing project.-This provides for the placing of riprap on the
riverbank and dike slope at a point in the sharp bend of the Con-
necticut River where the existing paving and dike were destroyed
during the March 1936 flood. The estimated cost of the construc-
tion was $12,818. No work was authorized by Congress. The proj-
ect was undertaken under the provisions of the Emergency Relief
Appropriation Act of June 22, 1936.
   Local cooperation.-Local interests were required to provide all
rights-of-way, to assume liability for any damage resulting from the
project, and to maintain the project after completion, in compliance
with section 3 of the Flood Control Act of June 22, 1936 (Public,
No. 738, 74th Cong.).
   Operations and results during fiscal year.-The placing of 2,628
cubic yards of riprap stone for bank protection was completed by
hired labor May 5, 1937, at a total cost of $12,818. The total costs and
expenditures were $12,818, for new work.
   Condition at the end of fiscal year.-The existing project was com-
pleted in 1937.
   Proposed operations.-None.
                                     Cost and financial sl/ln mary

Cost of new work to June 30, 1937____________________                                              __ _ $12, 818
Cost of maintenance to June 30, 1937_

      Total cost of permanent work to June 30, 1937__                                                             12, 818
Net total expenditures__                                                                            S             12, 818
Total amount appropriated to June 30, 1937___________                                                             12, 818


        Fiscal year ending June 30              1933          1934             1935         1936                  1937


Cost of new work ......        ------------------------                                                     $12, 818. 60
Cost of maintenance-...        ------------------------

Total expended--- -----        ------------------------                                                       12, 818.00
Allotted___                    ------------------------                                                       12,818.00
                                           I              I           I
132            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from Emergency Relief Appropriation Act of June
  22, 1936------------------------------------____________-------------------   $12,818
Gross amount expended----------------------------------               $12, 823
Less reimbursements collected-------------------------------                  5
                                                                                 12, 818

34. CONNECTICUT RIVER AT HADLEY, MASS., LEVEE CONSTRUCTION

   Location.-The work covered by this relief project is on the east
bank of the Connecticut River, in the town of Hadley, Mass.
   Existing project.-This provides for the construction of 2,900
linear feet of earth fill and four gravity drains in the meadow area
north of State Highway "No. 9 and west of the center of the town
to prevent erosion and flood damage in a part of the town of Hadley.
The estimated cost of construction was $29,000.
   No work was authorized by Congress. The project was under-
taken under the provisions of the Emergency Relief Appropriation
Act of June 22, 1936.
   Local cooperation.-Local interests were required to provide all
rights-of-way, to assume liability for any damage resulting from the
project, and to maintain the project after completion, in compliance
with section 3 of the Flood Control Act of June 22, 1936 (Public, No.
738, 74th Cong.).
   Operations and results during fiscal year.-Placing of 42.845 cubic
yards of earth in restoring existing dike, damaged by flood of 1936,
to original grade, at a total cost of $27,744.72, and installing four
gravity drains, totaling 400 linear feet at a total cost of $1,255.28, by
hired labor, was completed May 7, 1937. The total costs and expendi-
tures were $29,000 for new work.
   Condition at the end of fiscal year.-The existing project was com-
pleted in 1937.
   Proposed operations.-None.
                                     Cost and financial sunntary

Cost of new work to June 30, 1.937----_------                    _______------                     $29, 000.00
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937__-- _______ -  29, 000. 00
Net total expenditures_----____________-----_                      29, 000. 00
Total amount appropriated to June 30, 1937----     --------------- 29, 000. 00
        Fiscal year ending June 30                 1933   1934               1935         1936          1937


Cost of new work .                                                                                       $29, 000
Cost of maintenance_-
Total expended...                                  _      ...------------------                           29, 000
         - -
Allotted....                         -----------                        ----------   -----------          29, 000



Amount allotted from Emergency Relief Appropriation Act of June
  22, 1936--------------------------------                               $29, 000. 00
Gross amount expended _________----        -____- ________- $30, 156. 16
Less reimbursements collected --------.---.- ____--           1, 156. 16
                                                                          29, 000. 00
            RIVERS AND HARBORS-PROVIDENCE,                                      It. I., DISTRICT                133
35. CONNECTICUT RIVER AT HATFIELD, HAMPSHIRE COUNTY, LEVEE
                 CONSTRUCTION AND REPAIRS

   Location.-The work covered by this relief project is on the west
bank of the Connecticut River in the town of Hatfield, Mass.
   Existing project.-This provides for the restoration of 3,000 linear
feet of earthen diker along the Connecticut River, extending north
and south from Bridge Lane. to provide protection against erosion
and flood damage for a part of the town of Hatfield, Mass. The
estimated cost of construction was $34,146.
   No work was authorized by Congress. The project was under-
taken under the provisions of the Emergency Relief Appropriation
Act of June 22, 1936.
   Local cooperation.--Local interests were required to provide all
rights-of-way, to assume liability for all damage resulting from the
project, and to maintain the project after completion, in compliance
with section 3 of the Flood Control Act of June 22, 1936 (Public,
No. 738, 74th Cong.).
   Operations and results during fiscal year.-Placing of 28,813 cubic
yards of earth in restoring existing dike, damaged by the flood of
1936, to original grade and section and protecting completed dike by
placing 306 cubic yards of riprap paving by hired labor was com-
pleted May 7, 1937, at a total cost of $19,128.05 for earthwork and
$2,017.95 for riprap. The total costs and expenditures were $21,146,
for new work.
   Condition at the end of fiscal year.--The existing project was com-
pleted in 1937 at a saving of $13,000 under the estimated cost.
   Proposed operations.-None.
                                       Cost and financial summary

Cost of new work to June 30, 1937------------------------------   $21, 146. 00
Total cost of permanent work to June 30, 1937--------------------21, 146. 00
Net total expenditures------------------------ ------------------ 21, 146. 00
Total amount appropriated to June 30, 1937-----------------------21, 146. 00

         Fiscal year ending June 30                   1933          1934          1935             1936       1937


Cost of new work---....------------------      -------------------------------------                        $21, 146.00
Cost of maintenance.... ------------    ------------ I ---- --------                     -------            ,
                                                                                                           --------
Total expended....------------- ----....----------------                      ----------- ------------ 21, 146. 00
Allotted--------------------------------------------------------------------                                 21,146.00


Amount allotted from Emergency Relief Appropriation Act approved
  June 22, 1936-----------------------------------------------$34,                                            146. 00
Deductions on account of revocation of allotment------------------                                        13, 000. 00
      Net amount to be accounted for----------------------21,                                                 146. 00
Gross amount expended_---------------------------                                      -                  21, 146. 00
36. CONNECTICUT RIVER AT HATFIELD, HAMPSHIRE COUNTY, NEW
                    LEVEE CONSTRUCTION

  Location.-The work covered by this relief proiect is on the west
bank of the Connecticut River in the town of Hatfield, Mass.
134       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for the construction of an earth
dike across overbank scours in the Bradstreet Meadows area, along
the Connecticut River, to provide protection against erosion and
flood damage in the town of Hatfield. The estimated cost for con-
struction was $21,000.
   No work was authorized by Congress. The project was under-
taken under the provisions of the Emergency Relief Appropriation
Act of June 22, 1936.
   Local Cooperation.-Local interests were required to provide all
rights-of-way, to assume liability for any damage resulting from the
project, and to maintain the project after completion, in compliance
with section 3 of the Flood Control Act of June 22, 1936 (Public, No.
738, 74th Cong.).
   Operations and results during fiscal year.-Placingof 33,760 cubic
yards of earth in new dike, 989 cubic yards of riprap stone in bank
protection, and 360 lineal feet of gravity drain was completed April
20, 1937, by hired labor. Cost for earth dike was $16,242.46, rip-
rap $3,791.70, and gravity drains $965.84. The total costs and ex-
penditures were $21,000 for new work.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937, at a cost and expenditure of $21,000 for new work.
   Proposed operations.-None.
                                Cost and financial summary

Cost of new work to June 30, 1937 ----            -------------                                              $21, 000
Cost of maintenance to June 30, 1937-----------------------------                                             ---
       Total cost of permanent work to June 30, 1937--                                   -               -    21, 000
Total amount appropriated to June 30, 1937 _-                         --                                      21, 000
Net total expenditures------------------------------                                                          21, 000


       Fiscal year ending June 30        1933     1934                     1935                   1936          1937


Cost ofnew work___                                                                                                  $21, 000
Cost ofmaintenance                   -.----------
                         ----------.---
                        ----                                 --            --
Total expended___                                                                            --                      21, 000

       -----------
Allotted_               ---                                       -               -                 --               21, 000


Amount allotted from Emergency Relief Appropriation                               Act of June
  22, 1936     -.                                   ___ _                       ------                       $21, 000
Gross amount expended-                                        ___                                             21, 000
    37. CONNECTICUT RIVER AT WEST SPRINGFIELD IN HAMPDEN
                 COUNTY, MASS.-BANK PROTECTION

   Location.-The work covered by this relief project is located along
the west bank of the Connecticut River in the town of West Spring-
field, Mass.
   Existing project.-This project provides for the placing of riprap
on the river bank from the Memorial Bridge to a point 3,000 feet
north of the North End Bridge to provide a stable bank and in-
creased flood protection to the town of West Springfield, Mass. The
estimated cost for construction was $18,500.
   No work was authorized by Congress. The project was undertaken
under the provisions of the Emergency Relief Appropriation Act of
June 22, 1936.
             RIVERS AND HARBORS-PROVIDENCE,                                            IR. I.. DISTRICT                      135
  Local cooperation.-Localinterests were required to provide rights-
of-way, to assume liability for any damage resulting from the proj-
ect, and to maintain the project after completion, in compliance with
section 3 of the Flood Control Act of June 22, 1936 (Public, No. 738,
74th Cong.).
   Operations and results during fiscal year.-Placingof 7,551.65 tons
of riprap stone for bank protection was completed by hired labor
June 30, 1937, at a cost of $18,500 for new work. The total expendi-
ture was $18,462.19.
   Condition at the end of fiscal year.-The existing project was com-
pleted in 1937, at a cost of $18,500 for new work. The total expendi-
ture was $18,462.19.
  Proposed operations.-None.
                                     Cost and financial summary
Cost of new work to June 30, 1937_________                                                                 --      $18,       0.00
Cost of maintenance to June 30, 1937_
     Total cost of permanent work to June 30, 1937                                                                   18, 500. 00
Minus accounts payable June 30, 1937                                                                                      37. 81
           Net total expenditures_ ___..._                _._....                                                    18, 462. 19
Unexpended balance June 30, 1937________________________________                                                            37. 81
           Total amount appropriated to June 30, 1937_                                                               18, 500. 00

           Fiscal year ending June 30                   1933           1934             1935           1936                1937


Cost of new work .... __ _.__.___.              _              .    . . . . . .   ..    . ..   .   . . .         ..     $18, 500. 00
Cost of maintenance                                                     ------                                  ----------
Total expended-.....                                                                                                      18, 462. 19
Allotted       __                    -                                                                                    18, 500. 00


Amount allotted from Emergency Relief .Appropriation Act of June
   22, 1936         _--                                                                                            $18, 500. 00
Gross amount expended                    - __       _                                                               18, 462. 19

      Balance unexpended June 30, 1937_____________________                                                                 37. 81
Outstanding liabilities June 30, 1937_______________________                                                                37. 81
38.    CONNECTICUT RIVER AT SPRINGFIELD AND WEST SPRINGFIELD
            IN HAMPDEN COUNTY, MASS., RAISING LEVEES

   Location.-The work covered by this relief project is along the
Connecticut River in the city of Springfield and the town of West
Springfield, Mass.
   Existing project.-This provides for the raising and enlarging of
existing dikes and the construction of new dikes, concrete flood walls,
and stop-log structures and riprap bank protection. The Springfield
work extends from high ground in the southern part of the city of
Chicopee, Mass., south to the North End Bridge in Springfield, Mass.
The West Springfield work extends from the Memorial Bridge in
West Springfield north to a point approximately 3,000 feet north of
the North End Bridge. The Agawam work extends in West Spring-
field from the Memorial Bridge south along the Connecticut River
and west along the Westfield River for a distance of about 5,500
linear feet from the Memorial Bridge and north of the Agawam
Bridge along the Westfield River for a distance of approximately
2,750 feet to high ground.
136       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimated cost of construction was $255,000.
   No work was authorized by Congress. The project was under-
taken under the provisions of the Emergency Relief Appropriation
Act of June 22, 1936.
   Local cooperation.--Local interests were required to provide all
rights-of-way, to assume liability for any damage resulting from the
project, and to maintain the project after completion, in compliance
with section 3 of the Flood Control Act of June 22, 1936 (Public,
No. 738, 74th Cong.).
   Operations and results during fiscal year.--(a) North Spring-
field.--Thirty-eight thousand two hundred twenty-seven cubic yards
of earth in dike at a total cost of $39,623.94; 4,052 cubic yards of rip-
rap and 295 tons derrick stone for bank protection at a total cost of
$22,799.60, and 1,078 cubic yards of concrete in flood walls and retain-
ing walls at a total cost of $18,206.19 were placed by hired labor.
    (b) West Springfield.-Forty-threethousand two hundred eighty-
five cubic yards of earth in raising and extending dike at a total cost
of $48,139.39; 5,334 tons of riprap and derrick stone for bank pro-
tection at a total cost of $10,305.73, and 2,751 cubic yards of concrete
for flood walls and stop-log structures at a total cost of $60,160.16
were placed by hired labor.
    (c) Agawam.-Sixty-three thousand nine hundred cubic yards of
earth in enlarging and extending dike at a total cost of $47,897.50,
328 tons of riprap stone for bank protection at a total cost of $458.08,
and 238 cubic yards of concrete for flood walls at a total cost of
$5,632.99 were placed by hired labor. The total costs were $253,223.58
and the expenditure was $221,887.97, all for new work.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937, except Agawam which was 99 percent complete. The
work remaining to be done consists of clean-up at the site of the
work. To complete flood protection for the town of West Spring-
field requires raising and enlarging approximately 6,000 linear feet
of earth dike along the Westfield River between a point 5,500 feet
below the Memorial Bridge to the Agawam Bridge requiring place-
ment of 100,000 cubic yards of earth at an estimated cost of $115,000,
a concrete gravity drain at an estimated cost of $3,000 and 5,000
cubic yards of riprap stone for bank protection at an estimated cost
of $23,000.
   Proposed operations.-Clean-up work at Agawam will be com-
pleted by July 8, 1937, at an estimated cost of $1,776.32, which
amount will exhaust project allotment.
                         Cost and financial summary
Cost of new work to June 30, 1937________
                                  .       _______________ $253, 223. 58
Cost of maintenance to June 30, 1937____________________

      Total cost of permanent work to June 30, 1937---______-     253, 223. 58
Undistributed costs June 30, 1937____     ________     _______      1, 316. 63
      Net total cost to June 30, 1937,_______-
                                        -        ________  ____   254, 540. 21
Minus accounts payable June 30, 1937 __-....     _____--____- -    32, 652. 24
     Net total expenditures----
                          .....                                   221, 887. 97
Unexpended balance June 30, 1937---
                                ...-                         -     33, 112. 03
      Total amount appropriated to June 30. 1937 -------          255, 000. 00
            RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                        137

        Fiscal year ending June 30                      1933          1934          1935         1936           1937


Cost of new work--....       -------       -       ---------      --------- -----------------------          $253,223.58
Cost of maintenance-----------------.--            --            ---------
                                                          ----- ,--           ------------- ------------ -     ---------
Total expended -----------         -- -        -          _----------------   ------------------------        221,887.97

Allotted--------         -------          ---------------------------- -------------------                    255, 000. 00


Amount allotted from Emergency Relief Appropriation Act of June
  22, 1936-----------      -------------------------------- $255, 000. 00
Gross amount expended     ------------------------ $230, 197. 58
Less reimbursements collected----------------------    8, 309. 61
                                                                  221,887. 97
      Balance unexpended June 30, 1937----------------------                                             33, 112. 03
Outstanding liabilities June 30, 1937------------ -------------                                          32, 652.24

        Balance available June 30, 1937---------------- -------                                                459. 79

39. CONNECTICUT RIVER AT THE CITY OF HARTFORD, RAISING AND
                     EXTENDING LEVEES

   Location.-The work covered by this relief project is on the west
bank of the Connecticut River in the city of Hartford, Conn.
   Existing project.-This provides for raising and enlarging the
existing dikes in the southern part of the city of Hartford, Conn.,
locally known as the Colt dike, which extends from the mouth of the
Park River south along the right bank of the Connecticut River to
Wawarme Avenue, and the Clark dike, extending south from Wa-
warme Avenue along the Connecticut River and thence west along the
Wethersfield town line to high ground. The estimated cost of con-
struction was $250,000.
   No work was authorized by Congress. The project was under-
taken under the provisions of the Emergency Relief Appropriation
Act of June 22, 1936.
   Local cooperation.-Local interests were required to provide all
rights-of-way, to assume liability for any damage resulting from the
project, and to maintain the project after completion in compliance
with section 3 of the Flood Control Act of June 22, 1936 (Public, No.
738, 74th Cong.).
   Operations and results during fiscal year-(a) Clark dike.-Ninety-
six thousand two hundred ninety-five cubic yards of earth in dike at
a total cost of $73,006.07 and 179.9 cubic yards of concrete in retain-
ing wall and stop-log structures at a total cost of $9,927.07 were
placed by hired labor.
   (b) Colt dike.-Thirty-six thousand four hundred and thirty
cubic yards of earth in dike were placed by hired labor at a total cost
of $45,314.62. The total costs were $128,247.76 and the expenditure
was $127,235.47, all for new work.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1937, except Clark dike, which was 99 percent complete.
The work remaining to be done consists of clean-up at the site of
work. The total cost was $128,247.76 for new work. The total ex-
penditure was $127,235.47.
  Proposed operations.-Clean-upwork on Clark dike will be com-
pleted by July 15, 1937, at an estimated cost of $4,752.24, a saving
of $117,000.
138            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                            Cost and financial summary

Cost of new work to June 30, 1937-----                                                                                       $128, 247. 76
(Cost of maintenance to June 30, 1937___                                          _______________

           Total cost of permanent work to June 30, 1937---                                                                   128, 247. 76
Undistributed      costs June 30, 1937           --       -                                                                     3, 673. 55

           Net total cost to June 30, 1937_-____                                                                              131, 921. 31
Plus accounts receivable June 30, 1937_----                                                                                      1, 016.23

     Gross total costs to June 30, 1937___                                                                                   132, 937. 54
Minus accounts payable June 30, 1937                                                                                           5, 702. 07

     Net total expenditures -----------------                                                 --           --        ---      127, 235. 47
Unexpended balance June 30, 1937       ---   ___                                             ----                               5, 764. 53

           Total amount appropriated to June 30, 1937----                                           ----                      133, 000. 00

           Fiscal year ending June 30                          1933             1934          1935                    1936           1937

Cost of new work___                                                                                                              $128, 247. 76
Cost of maintenance --                                                             -

Total expended_-                                                                                                                  127, 235. 47

Allotted                                      -    -   -              -     -                                                     133, 000. 00


Amount allotted from Emergency Relief Appropriation Act of
  June 22, 1936-_.____                              _               $250, 000. 00
Deductions on account of revocation of allotment ------------------  117, 000. 00

      Net amount to be accounted for__ -- _____-__________                                                                    133, 000. 00
Gross amount expended-----------------------------------                                                                      127, 235. 47
      Balance unexpended June 30, 1937----                                             --                                       5, 764. 53
Outstanding liabilities June 30, 1937....--- --                                                                                 5, 947. 19

     Balance available June 30, 1937__-_____________________                                                                    -- 182. 66
Accounts receivable June 30, 1937  ________                                                                                     1, 016. 23

           Unobligated balance available June 30, 1937                                                                             833. 57

Status of reports             called for by river and harbor acts and committee resolutions
                                                                      Date trans-Recommenda-
           Locality                Authorization act                   mitted to       Document no.                          Recom     n
                                                                       Congress

Ash Creek, Conn .--...          River        and    Harbor        Nov.     7,1936 ---------------------                      Unfavorable.
                                   Act, Aug. 30, 1935.
Blackstone River from               -do          -- _ _           Apr. 14, 1937 -----                      -....--   ._          Do.
  Narragansett Bay at
  Providence, R. I., to
  Worcester, Mass.
Block      Island     (inner     ---    do-___             _      Nov. 19, 1936 ---------.....---------------                    Do.
  harbor), R. I.
Branford Harbor, Conn_ River and Harbor Dec. 10, 1936 .....-----------.............----------.....                               Do.
                         Committee resolu-
                         tion, Jan. 14, 1936.
Bridgeport, Harbor, River and Harbor Apr. 13, 1937 House,232,75th Cong.,                                                     Favorable.
  Conn.                  Act, Aug. 30, 1935.                1st sess.
Clinton Harbor, Conn_. River and Harbor------------------------------
                                       Act, Aug. 26, 1937.
            RIVERS AND HARBORS-PROVIDENCE, R. I., DISTRICT                                                                   139
      Status of reports called for by river and harbor acts and committee
                              resolutions-Continued

                                                           Date trans-                                             Recommenda-
        Locality              Authorization act            mitted to                          Document no.
                                                                                                                       tion
                                                            Congress


Connecticut River at        River and     Harbor       ...............
East Hartford, Conn.        Act, Aug. 30, 1935.
 (flood control).
Connecticut River           Flood Control Com-
 (flood control).             mittee    resolution,
                              Mar. 27, 1936.
Connecticut River,          Flood Control Act,
Mass. (preliminary ex-       June 13, 1934.
amination for flood
control).
Connecticut River below     River  and Harbor
Hartford, Conn., and        Act, Aug. 26, 1937.
North Cove in Old
Saybrook.
Connecticut River           River   and Harbor
between Hartford,           Committee resolu-
Conn., and Springfield      tion, Aug. 23, 1935.
and Holyoke, Mass.
Cuttyhunk Harbor,           River    and Harbor          Aug. 12, 1936              House, 81, 75th Conig.,        Favorable.
Mass.                        Act, Aug 30, 1935.
Greenwich Harbor,           River    and Harbor
Conn.                        Act, Aug. 26, 1937.
Housatonic River,           River    and Harbor         Dec. 10, 1936                                              Unfavorable.
Conn.                        Committee resolu-
                              tion, Jan. 14. 1936.
Housatonic River, Conn.     Flood Control Com-
 (flood control).             mittee reslution
                              Apr. 2, 1936.
Lewis Bay and Harbor        River and Harbor Act,        Nov. 17, 1936                                                 Do.
  at West Yarmouth,           Aug. 30, 1935.
  Mass.
Little Narragansett Bay River       and Harbor         ...............
  andW atch Hill Cove,    Committee resolu-
  R. I.                   tion, Jan. 24, 1936.
Mianus River, Conn -_   River and Harbor Act,          --...........
                          Aug. 26, 1937.
Milford Harbor, Conn__ River and Harbor Act,            Aug. 26, 1936               House, 77, 75th Cot            Favorable.
                          Aug. 30, 1935.                                                 1st sess.
New Bedford and Fair-   River and Harbor                Apr.             1, 1937    River and Harl                     Do.
  haven Harbor, Mass.     Committee resolu-                                           Committee, 25, 74
                          tion, Mar. 20, 1936.                                        Cong., 1st sess.
New Haven Harbor,       River and Harbor                Apr.             8, 1937   --.................             Unfavorable.
  Conn.                   Committee resolu-
                          tion, Jan. 14, 1936.
New London Harbor,      River and Harbor
  Conn.                   Committee resolu-
                          tion, Mar. 3, 1937.
Newport Harbor, R. I__ River and Harbor                 June             7, 1937    River and Harbor               Favorable.
                          Committee resolu-                                           Committee, 36, 75th
                          tion, Mar. 6, 1936.                                         Cong., 1st sess.
Noank Cove, Conn ___    River and Harbor Act,           Dec. 28, 1936                                              Unfavorable.
                          Aug. 30, 1935.                                           ........................
Norwalk Harbor, Conn_ River and HarborAct,
                          Aug. 26, 1937.                                           ........................
Padanaram Harbor, ---        d o - - - ----------- .
  South    Dartmouth,
  Mass.
Providence River and    Senate committee reso-          Mar. 18, 1937               House,173, 75th Cong.,         Favorable.
  Harbor, R. I.           lution, July 31, 1935.                                     1st sess.
     Do_-----------     River andHarbor Act,            --
                                                        May   1937.. ....do--------------.
                                                            12do,                                                     Do.
                          Aug. 30, 1935.
Stamford Harbor, Conn_ River        and Harbor          May 12,1937                 River and Harbor                  Do.
                          Committee resolu-                                           Committee, 29, 75th
                          tion, Apr. 30, 1935.                                        Cong., 1st sess.
Warren River and Bar-   River and Harbor Act,                                      ........................
  rington Harbor, R. I.   Aug. 26, 1937.
Wescott Cove, Conn ...       do..-----------
                            .....
Westport River, Mass__ River andfHarbor Act,
                          Aug. 30, 1935.
                                                                                                              ,I
140        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
         FIRST NEW YORK, N. Y., DISTRICT
  This district includes all of the principal channels and anchorages
of the greater part of the Lower and Upper Bays, New York Har-
bor, from the Battery, New York City, to the Atlantic Ocean; the
rivers and harbors of Long Island, N. Y., Long Island Sound, and
the rivers and harbors on its northern shore west of the Connecticut
boundary line; East River from the head of Long Island Sound at
Throgs Neck to the Battery, New York City, including its tributaries;
Hudson River and tributaries; Lake Champlain and tributaries from
Whitehall, N. Y., to the Canadian border; and for purposes of flood
control embraces the headwaters of the Susquehanna River above and
including the Chemung River.
  District engineer: Col. E. L. Daley, Corps of Engineers.
  Division engineer: Col. E. D. Peek, Corps of Engineers.
                                    IMPROVEMENTS

                                      Page                                        Page
1.   Port Chester Harbor, N. Y__      140   25. East River, N. Y_______          184
2.   Mamaroneck Harbor, N. Y__        142   26. Wallabout Channel, N. Y .-.      187
3.   Echo Bay Harbor, N. Y ....       144   27. Newtown Creek, N. Y___ ___       188
4.   New Rochelle Harbor, N. Y_     . 145   28. Harlem River, N. Y_____ ___      191
5.   East Chester Creek, N. Y___      147   29. Hudson River Channel, New
6.   Westchester Creek, N. Y ...      150         York Harbor_     ______        194
7. Bronx River, N. Y__ __-__          151   30. New York Harbor: Collec-
8. Harbor at Flushing Bay,                         tion of drift ____________    198
      N. Y--------                     153   31. Irvington Harbor, N. Y _____     200
9. Hempstead Harbor, N. Y ____        155   32.   Tarrytown Harbor, N. Y -...    201
10. Glencove Creek, N. Y __.__  -.     156   33.   Peekskill Harbor, N. Y ___     203
11. Mattituck Harbor, N. Y_...-        158   34.   Wappinger Creek, N. Y .__-     205
12. Greenport Harbor, N. Y_____        160   35.   Rondout Harbor, N. Y:___ .     205
13. Peconic River, N. Y__-.-...        161   36.   Hudson River, N. Y ______      207
14. Sag Harbor, N. Y____--_            162   37.   Great Lakes to Hudson River
15. Long Island Intracoastal Wa-                     Waterway ------        ---    213
      terway, N. Y_           __       164 38.     Narrows of Lake Champlain,
16. Great South Bay, N. Y .....        165           N. Y. and Vt__     _______    221
17. Fire Island Inlet, N. Y_ __        167 39.     Burlington Harbor, Vt---- -     223
18. East Rockaway (Debs) In-               40.     Examinations, surveys, and
      let, N. Y-_..-___-               168           contingencies (general)___    225
19. New York Harbor: Ambrose,              41.     Other projects for which no
      Main Ship, Bayside, and                        estimates are submitted___    227
      Gedney Channels, including             42.   Plant allotment___     ____     227
      Anchorage Channel, Cra-
      ven Shoal, channel be-                           FLOOD-CONTROL   PROJECTS
      tween Staten Island and
      Hoffman and Swinburne                  43. Lamoille River. Vt------._--      228
      Islands, anchorage areas               44. Winooski River, Vt .. _._-        229
      and channel along the New              45. Otter Creek, at Rutland and
      Jersey pierhead line, Up-                    Proctor, Vt          _          232
      per Bay-------------_--          170   46. Hoosic River, Mass., Vt., and
20. Coney Island Channel, N. Y_        174         N. Y                     -      232
21. Coney Island Creek, N. Y ____      175   47. Wallkill River, N. Y________      233
22. Bay Ridge and Red Hook                   48. Susquehanna River headwa-
      Channels, N. Y _______           177         ters, west branch of the
23. Gowanus Creek Chan ne 1,                       Delaware River, and upper
      N. Y-------------------          180        Finger Lakes Basins in New
24. Buttermilk Channel, N. Y___        181         York and Pennsylvania___        236
                      1. PORT CHESTER HARBOR, N. Y.

  Location.--This harbor is located at the boundary between the
States of New York and Connecticut, and about 32 miles by water
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT            141
east of the Battery, New York City. (See U. S. Coast and Geodetic
Survey Chart No. 222.)
    Previous projects.-Adopted by River and Harbor Acts of June
10, 1872, March 3, 1899, and March 2, 1907. The cost and expendi-
tures were $74,995.10 for new work and $16,369.12 for maintenance,
a total of $91,364.22. For further details see Annual Report for 1915,
page 1758.
    Existing project.-This provides for an anchorage basin near the
breakwater, 12 feet deep, for fenders on the east bank opposite the
southern end of Fox Island, and for a channel 12 feet deep at mean
low water and 150 feet wide from Long Island Sound to the mouth
of the river at the southerly point of Fox Island; thence 10 feet
deep and 100 feet wide to 900 feet below the fixed bridge at Mill
Street in Port Chester, including a turning basin opposite the steam-
boat landing; and thence 3 feet deep and 175 to 100 feet wide to
100 feet below the fixed bridge. The length of the section included
in the project is about 15/ miles. Mean tidal range, 7.3 feet; mean
range of spring tides, 8.6 feet; irregular fluctuations due to wind
and barometric pressure vary from 4 feet below mean low water up
to 4.5 feet above mean high water.
    The estimate of cost for new work, revised in 1930, is $454,000,
exclusive of amounts expended on previous projects, of which $5,500
is to be contributed by local interests. The latest (1927) approved
estimate for annual cost of maintenance after completion is $3,000.
    The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1165, 60th Cong., 2d sess.), and modified
by the River and Harbor Act of July 3, 1930 (Rivers and Harbors
Committee Doc. No. 23, 70th Cong., 2d sess.), the latter act providing
for widening the turning basin, for an anchorage basin, and for
fenders on the east bank. The latest published maps are in the
project documents.
    Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that local interests shall contribute $5,500 in cash toward
widening the channel at the turning basin. This condition has not
been complied with.
    Terminal facilities.-Water terminals, 24 in number, with avail-
able dockage of 3,697 feet, are located on Byram River at and between
Fox Island and the fixed bridge. The existing facilities appear to be
adequate for existing commerce.
    Operations and results during fiscal year.-The cost of a survey
made in June 1937 to determine the condition of the channel was
$923.97, for maintenance. There were no expenditures.
   Condition at end of fiscal year.-About 75 percent of the existing
project has been completed. The work remaining to be done under
the existing project consists in the removal of scattered rock shoals,
widening the turning basin, and constructing fenders on the bank
opposite the southern end of Fox Island. When examined in May
1931, August 1934, March 1935, and June 1937, the controlling mean
low water depth was 12 feet for a width of 150 feet from Long
Island Sound to Byram Point, just below Fox Island; 12 feet in the
anchorage basin; thence 10 feet for a width varying from 100 to 50
feet to the turning basin except for several isolated rock shoals at a
depth of 9.5 feet; 10 feet in the turning basin; and 9 feet to 1 foot
from the turning basin to the head of the improvement for a width
142      *     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of from 150 to 80 feet.                        The total cost of the existing project to
June 30, 1937, was $409,632.63-$338,891.13 for new work and $70,-
741.50 for maintenance.    The total expenditures   amounted to
$408,708.66.
  Proposed operations.--The balance unexpended at the end of the
fiscal year, amounting to $1,371.44, less accounts payable amounting
to $923.97, and including an allotment of $12,000 made during July
1937, will be applied to the removal of isolated rock shoals from Fox
Island to the turning basin.
  It is believed that maintenance dredging to restore the channel to
project dimensions from Fox Island to the turning basin will be
necessary during the next 2 years.                               Therefore, the sum of $12,000 can
be profitably expended during the fiscal year ending June 30, 1939.
                                      Cost and financial summary

Cost of new work to June 30, 1937--                                                                                     $413, 886. 23
Cost of maintenance to June 30, 1937________________________                                                              87, 110. 62
     Total cost of permanent work to June 30, 1937             500, 996. 85
Minus accounts payable June 30, 1937--------------------------      923. 97
      Net total expenditures--5--___- ___-5_____________                                                                  00, 072. 88
Unexpended balance June 30, 1937_---               -  __                                                    _              1, 371. 44
                                                                                                                           1-------
         Total amount appropriated to June 30, 1937 -                                                                    501, 444. 32

        Fiscal year ending June 30                   1933              1934                 1935             1936               1937


Cost of new work                                  $10, 430. 07
Cost of maintenance_                                9, 836. 98    ------              $8, 628. 56        ------------            $923. 97
      Total cost_______________                    20, 267. 05                             8, 628. 56        _                       923. 97
Total expended ___________________                 20, 501. 07       ____                  8, 580. 29            48. 27
Allotted----                           -----     -10, 244. 11
                                                ------------------                    10, 000. 00                   -            -



Balance unexpended July 1, 1936_  ---                                                                       _             $1, 371. 44
Gross amount expended______________________________                                                     $63. 65
Less reimbursements collected____________________________                                                63. 65
                                                                                                                                     0.00

      Balance unexpended June 30, 1937                             __                                                      1, 371. 44
Outstanding liabilities June 30, 1937------------------------------                                                           923. 97
     Balance available June 30, 1937                                                                                          447. 47
Amount allotted during July 1937 --------------------------------                                                         12, 000. 00

     Balance available for fiscal year 1938----____----------___                                                          12, 447. 47
Amount (estimated) required to be appropriated for completion of
                                  _
   existing     project   12                      _--
                                                _____                                                                     98, 000. 00
Amount that can be profitably expended in fiscal year ending June
                                                       - - - - -- - - - -
   30, 1939, for maintenance                                                ------------                                        12, 000
  1Exclusive of available funds.
  2 In addition, $5,500 is to be contributed                by local interests.
                               2. MAMARONECK HARBOR, N. Y.

   Location.-This harbor is situated on the north shore of Long
Island Sound, 5 miles west of the Connecticut State line, and 27 miles
by water east of the Battery, New York City. (See U. S. Coast
and Geodetic Survey Chart No. 222.)
        RIVERS AND HARBORIS-FIRST NEW YORK, N. Y., DISTRICT                 143

   Previous projects.-Adopted by River and Harbor Acts of August
2, 1882, and July 25, 1912. The total cost and expenditures were
$94,139.29-$80,724.43 for new work and $13,414.86 for maintenance.
For further details see Annual Reports for 1915 and 1924, pages 1759
and 141, respectively.
   Existing project.-This provides for an anchorage area near the
head of navigation and for a channel 10 feet deep at mean low water
and 100 feet bottom width from deep water in Long Island Sound to
Orienta Point, and thence 80 feet bottom width following the lines
of the project adopted by the River and Harbor Act of July 25, 1912
 (H. Doc. No. 1087, 61st Cong., 3d sess.), to a point about 150 feet
below the Boston Post Road, with an extension having the same
bottom width 300 feet northeast of the main channel, with widening
at bends, and for an anchorage in the West Basin 6 feet deep at mean
low water with a channel of like depth and 80 feet wide connecting
this anchorage with the existing channel in the harbor. Length of
section included in project, 134 miles. Mean tidal range, 7.3 feet;
mean range of spring tides, 8.6 feet; irregular fluctuations due to
wind and barometric pressure vary from 4 feet below mean low water
up to 4.5 feet above mean high water.
   The estimated cost for new work, revised in 1935, is $161,000,
exclusive of amounts expended on previous projects but including
$26,500 to be contributed by local interests. The latest (1935) ap-
proved estimate of cost of annual maintenance is $1,500.
   The existing project was authorized by the following river and
harbor acts: The act of September 22, 1922 (H. Doc. No. 651, 66th
Cong., 2d sess.), provided for the 10-foot channel and anchorage;
and the act of August 30, 1935 (Rivers and Harbors Committee Doc.
No. 4, 74th Cong., 1st sess.), provided for the 6-foot anchorage in
West Basin and its approach channel.
   Local cooperation.-The River and Harbor Act of August 30, 1935,
provided for an anchorage in the West Basin with approach channel
thereto, subject to the conditions that local interests-
  (a)    Shall provide adequate and suitable spoil disposal areas suitably diked
or bulkheaded as needed.
   (b) Shall pay one-half of the first cost of the new work of the anchorage and
connecting channel.
   (c) Shall furnish assurances satisfactory to the Secretary of War that there
will be, at all times, available to the users of the anchorage in the West Basin,
free and suitable access to the shore over publicly owned landings.
  These conditions have not yet been complied with.
  Terminal facilities.-Water terminals, six in number, with a total
available dockage of 1,450 linear feet. are located near the head of
navigation. These facilities afford ample accommodation for pres-
ent and immediately prospective requirements of commerce.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year. The existing project is about 67
percent completed. The 10-foot channel and anchorage have been
completed. No work has been done on the anchorage in West Basin
or in the approach channel thereto. The controlling mean low-
water depth when examined in May 1934 and May-June 1935, was
10 feet throughout the length of the 10-foot project, varying from
100 feet in width at the entrance in Long Island Sound to 80 feet
wide elsewhere. The controlling depth in the West Basin and con-
        20196--37--pt. 1---10
144           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

necting channel was about 4 feet above mean low water. The work
remaining to complete the project consists in excavating the an-
chorage in West Basin and the connecting channel as authorized by
the River and Harbor Act of 1935. The total cost and expenditures
to June 30, 1937, were $146,863.59-$107,951.78 for new work and
$38,911.81 for maintenance.
   Proposed operations.-Provided conditions of local cooperation
are complied with in sufficient time, it is proposed to apply the sum
of $26,500 allotted during July 1937, together with an equal amount
to be contributed by local interests, in dredging the anchorage area
and approach channel authorized in 1935. Maintenance dredging
will not be necessary during the next two years.
                                        Cost and financial summary

Cost of new work to June 30, 1937------------------------------$188, 676. 21
Cost of maintenance to June 30, 1937---------------------------52, 326, 67
      Total cost of permanent work to June 30, 1937-- ------------                                       241, 002. 88
Net total expenditures___-----------------------------------------                                       241, 002. 88
Total amount appropriated to June 30, 1937------ ---------------                                         241, 002. 88

         Fiscal year ending June 30                  1933           1934           1935          1936               1937

Cost of new work- .....--------....-----------....... $29, 002. 88 .
Cost of maintenance......-------------------------------------------.           $11,270.58 -----------           ------

T otal expended                        ---------
                           _-------------___       29,002. 88   ------------.   10, 060. 08   $1, 239. 92p   -       .. . .
Allotted.............---        -------            29,045. 27     $5,957. 61      5,300. 00..........

Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-----------------------------------------   $26, 500.00
Amount available for fiscal year 1938---------------------------  26, 500. 00

                                     3. ECHO BAY HARBOR, N. Y.

   Location.-This harbor is situated on the north shore of Long
Island Sound, 8 miles west of the Connecticut State line and 24 miles
by water east of the Battery, New York City. (See U. S. Coast and
Geodetic Survey Chart No. 222.)
   Previous projects.-Adopted by the River and Harbor Act of June
18, 1878, and modified by River and Harbor Acts of June 13, 1902,
and March 2, 1907. The total cost and expenditures were $47,378.16-
$47,367.75 for new work and $10.41 for maintenance. For further
details see Annual Report for 1915, page 1760.
  Existing project.-This provides for a channel 10 feet deep at mean
low water and 100 feet wide, extending from the 10-foot contour
in Echo Bay to the city wharf at Beaufort Point (Hudson Park),
and a turning basin of the same depth at the inner extremity of
the channel. Length of section included in project, 1,300 feet. Mean
tidal range, 7.3 feet; mean range of spring tides, 8.6 feet; irregular
fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water up to 4.5 feet above mean high water.
  The estimated cost of new work, made in 1910, was $22,110, exclu-
sive of amounts expended on previous projects. Estimated cost of
annual maintenance, made in 1928, is $500.
      RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                 145

   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1118, 60th Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-Waterterminals, eight in number, with avail-
able dockage of 2,820 feet, are scattered along the water front at and
between Beaufort Point and the head of navigation. One is publicly
owned; it is inconveniently located with reference to the business
center; five are privately owned; and two are corporately owned.
   The facilities provided are adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1911, at a saving of $4,894 under the estimated cost. When
examined in March 1937 the controlling mean low water depth in
the entrance channel and turning basin was 9 feet. The total cost
and expenditures to June 30, 1937, were $23,421.45-$17,216.14 for
new work and $6,205.31 for maintenance.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $4,000, is available for revocation.
   A survey made in March 1937 discloses the existence of shoals near
the mouth of the project channel. The sum of $5,000 can, therefore,
be profitably expended under contract for maintenance during the
fiscal year ending June 30, 1939, to restore the channel to project
dimensions.
                                                   Cost and financial summary

Cost of new work to June 30, 1937----        ---------------------                                           $64, 583. 89
Cost of maintenance to June 30, 1937-------------------_                                                       6, 21. 72

           Total cost of permanent work to June 30, 1937___________                                              70, 799. 61

     Net total expenditures--------------------------------0, 799. 61
Unexpended balance June 30, 1937---------------------------- 4, 000. 00
           Total amount appropriated to June 30, 1937-------                                                     74, 799. 61

           Fiscal year ending June 30                             1933      1934             1935     1936           1937

Cost of new work.......-                  --             .....-
Cost of maintenance..                    ---...-                                     -.-.-

Totalexpended.......................-                 ---
Allotted                      .. ..
               ---------------------..         .      ----   -$504.45    -------   ------ -----     $4,000. 00       -


Balance unexpended July 1, 1936_------              -__-___-_______-
                                                                 -_ $4, 000. 00
Balance unexpended June 30, 1937_____-- ________________         __  4, 000. 00
Amount that can be profitably expended in fiscal year ending June
                              -- -      -               -   - -
  30, 1939, for maintenance 1       ____________________          _  5, 000. 00
  1 Exclusive of available funds.

                                    4. NEW ROCHELLE HARBOR, N. Y.

   Location.-This harbor is situated on the north shore of Long
Island Sound, 9 miles west of the Connecticut State line and 23
miles by water east of the Battery, New York City. (See U. S.
Coast and Geodetic Survey Chart No. 222.)
   Previous projects.-Adopted by the River and Harbor Act of
Mfarch 3, 1881. The total cost and expenditures were $43,174.79, for
146          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

new work. For further details see Annual Report for 1932, page
157.
   Existing project.-This provides for a channel 8 feet deep at mean
low water, 120 feet wide, and about 3,400 feet long, extending from
the deep-water channel between Glen Island and Davenport Neck
up to a point about 300 feet below a dam at the head of navigation
in the vicinity of Leland Avenue, New Rochelle, N. Y. Mean tidal
range, 7.3 feet; mean range of spring tides, 8.6 feet; irregular fluctu-
ations due to wind and barometric pressure vary from 4 feet below
mean low water up to 4.5 feet above mean high water.
   Estimated cost for new work, made in 1921, was $35,000, exclusive
of amounts expended on previous projects. Estimated cost of an-
nual maintenance, made in 1921, is $1,000.
   The existing project was adopted by the River and Harbor Act of
September 22, 1922 (H. Doc. No. 110, 67th Cong., 1st sess.). The
latest published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Water terminals, eight in number with avail-
able dockage of 1,200 feet, are located parallel to the channel. These
facilities afford ample accommodation for present and immediately
prospective requirements of commerce.
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 8 feet, for maintenance, work was commenced
July 10, 1936, and completed August 24, 1936. There was removed
during the fiscal year a total of 23,044 cubic yards, place measure-
ment, of material at a cost of $12,161.41, all for maintenance. The
total expenditures were $11,717.30.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1924 at a saving of $4,961 under the estimated cost. When
examined in August 1936, project depth of 8 feet existed throughout
the entire channel except for a small shoal having a least depth of
7.5 feet located about 1,600 feet above the entrance.
   The total costs and expenditures under the existing project to
June 30, 1937, were $51,262.27-$30,038.88 for new work and $21,-
223.39 for maintenance.
   Proposed operations.--There are no funds available for this proj-
ect, and no work is contemplated during the fiscal years 1938 and
1939.
                                     Cost and financial summary

                                 ---------------
Cost of new work to June 30, 1937__ ___          _                                      $73,213. 6.7
Cost of maintenance to June 30, 1937_      ---                                      _    21, 223. 39

      Total cost of permanent work to June 30, 1937                                         994, 437. 06
Net total expenditures                  ________________________                            94, 437. 06
Total amount appropriated to June 30, 1937-_                    _._                         94, 437. 06

        Fiscal year ending June 30              1933      1934       1935        1936            1937


Cost of new work .--------------           -                                -
Cost of maintenance -       _ --      --- -$ - ---. ---     ..-.       .    .       . 86
                                                                                 $300-.       $12,161. 41
Total expended                                                                      4.97        11,717.30
Allotted.-        - -..                                            $4, 000.00   9,000. 00        -537. 7&
     RIVERS AND HARBORS--FIRST NEW YORK,; N. Y., DISTRICT                          147

Balance unexpended July 1, 1936__                   __    __             $1,     255.03
                                                                               2____-
Deductions on account of revocation of allotment----------                       537. 73

      Net amount to be accounted for__ ----------------          _         11,717. 30
Gross amount expended ---------- _-_-__$1-                X11, 726. 16
Less reimbursements collected ___ _ _         _                  S. 86
                                                          -                11, 717. 30

                      5. EAST CHESTER CREEK, N. Y.

   Location.-This creek, also known as Hutchinson River, is a small
tidal stream emptying into East Chester Bay, an indentation in the
north shore of Long Island Sound, immediately north of Throgs
Neck, 12 miles southwest of the Connecticut State line and 21 miles
by water northeast of the Battery, New York City. (See I. S.
Coast and Geodetic Survey Chart No. 223.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1873, and June 25, 1910.
   The total cost and expenditures were $364,643.44-$199,619.79 for
new work and $165,023.65 for maintenance. For further details see
Annual Report for 1915, page 1761, and Annual Report for 1929,
page 167.
   Existing project.-This provides for a channel 8 feet deep and
generally 150 feet wide from Long Island Sound through East Ches-
ter Bay to a point 700 feet below the Boston Post Road Bridge, and
thence 70 feet wide to the northern terminus of the project, about
300 feet above the Fulton Avenue Bridge, and for a passing basin
in the vicinity of the Boston Post Road Bridge. Mean tidal range
7.3 feet in the estuary; mean range of spring tides, 8.6 feet; irregu-
lar fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water up to 4.5 feet above mean high water.
   The estimate of cost for new work made in 1930 is $283.000 exclu-
sive of amounts expended on previous projects. The latest (1930)
approved estimate for annual cost of maintenance is $15,000 for the
first 3 years and $12,000 annually thereafter.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (Rivers and HIarbors Committee Doc. No. 37, 71st Cong.,
2d sess.). The latest published map is in the project document.
   Local coopcration.-The River and Harbor Act of July 3. 1930,
provides that local interests shall furnish, without cost to the United
States, necessary rights-of-way and spoil-disposal areas, and shall
give assurances satisfactory to the Secretary of War and the Chief of
Engineers that they will dredge to a depth of 8 feet the large slip
located about 200 feet above the Boston Post Road Bridge and the
Y-shaped extension of the waterway above the terminus of the ex-
isting project. Spoil areas sufficient for the disposal of excavated ma-
terial have been furnished. Satisfactory assurances for the required
dredging and right-of-way for the passing basin have not been
furnished.
   Terminal facilities.--water terminals, 23 in number, with available
dockage of 6,415 feet, are located in the upper 3,500 feet of the pro-
jected improvement. Additional terminals are needed to meet the
increased demands of commerce. (For further details see Port
Sei'ies No. 20, Corps of Engineers.)
148             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 8 feet, work was commenced on June 18, 1936,
and completed July 14, 1936. There was removed during the fiscal
year a total of 72,572 cubic yards, place measurement, of material at
a cost of $31,636.
   Under a contract for dredging and rock removal to a depth of 8
feet, work was commenced March 30, 1936, and completed October
30, 1936. There were removed during the fiscal year 2,108 cubic
yards, place measurement, of ledge rock and 5,978 cubic yards, place
measurement, of material other than ledge rock at a cost of $48,530.16.
   The total cost was $80,166.16, all for new work and the total ex-
penditures were $114,810.70, all from Emergency Relief funds.
   Condition at end of fiscal year.-The existing project is about 65
percent completed. When examined in December 1935 and May to
October 1936, the controlling depth was 8 feet for a width of 60 to
150 feet from East Chester Bay to the mouth of the creek, thence 5
feet deep for a width of 50 to 150 feet to the head of the improve-
ment. The work remaining to be done under the existing project
consists in the removal of scattered rock shoals and material other
than ledge rock from the mouth of the creek to the head of the im-
provement.
   The total cost and expenditures of the existing project to June 30,
1937, were $183,000 from Emergency Relief funds, all for new work.
   Proposed operations.--The balance unexpended, at the end of the
fiscal year, amounting to $45,904.08, was revoked during July 1937.
   It is expected that the conditions of local cooperation under this
project will be complied with during the fiscal year 1938. Therefore,
the sum of $100,000 can be profitably expended during the fiscal
year ending June 30, 1939, under contract for new work, to complete
the deepening of the channel to 8 feet authorized in 1930. Mainte-
nance dredging will not be necessary during the next 2 years.
                                             Cost and financial summary
                                      MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937-----------------                                                               $199, 619. 79
Cost of maintenance to June 30, 1937                                                                               65, 023. 65
                                                                                                                  1-------------------------
          Total cost of permanent work to June 30, 1937--____                                                     364, 643. 44

Net total expenditures  -----------------------------------  364, 643.44
Unexpended balance June 30, 1937----------------------------45, 904.08
          Total amount appropriated to June 30, 1937_________________                                             410, 547. 52

          Fiscal year ending June 30                           1933           1934           1935         1936               1937


Cost of new work-----------------------....                     $264. 35 -
Cost of maintenance--------------......................        ...... ....                    195. 92
                                                                                           $11,
Total expended-------------------------...                      264.35 ----          ---   11,013.15      $182. 77    -

Allotted--------------            -       .----- ..---------    247.52-   .---.---         14,100.00    50,000.00         -$7,000.00


Balance unexpended July 1, 1936-----
                                .....                                                                             $52,904. 08
Deductions on account of revocation of allotment -----------                                                          7,000. 00
           Net amount to be accounted for .......                                            -------                 45, 904. 08
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                 149
Gross amount expended-------------------------------- $114. 37
Less reimbursements collected-     _____-------------114. 37
         Balance unexpended June 30, 1937-----------------------1                                                $45, 904. 08

Amount (estimated) required to be appropriated for completion of
existing project-____                                                  000. 00
                                                                  1---------------------------------
Amount that can be profitably expended in fiscal year ending June
30, 1939 for new work---------------------------------------100,       000. 00
  1 Revoked during July 1937.
                                           EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937•-----__              -$____    183, 000.00
                                                                $--------
Cost of maintenance to June 30, 1937__  _______________________

      Total cost of permanent work to June 30, 1937--------------                                                183, 000. 00
Net total expenditures ----------------                                                                          183, 000. 00
Total amount appropriated to June 30, 1937--------------     __--                                                183, 000. 00

        Fiscal year ending June 30                          1933              1934         1935          1936          1937


Cost of new work         _____________................_______
                                                      _       ___________            -------------   $102, 833.84    $80, 166. 16
Cost of maintenance..             ..                 ----------
                                          ...-------------                                           ---------------------
Total expended-___-___-_______________                                                                 68, 189. 30   114, 810. 70
Allotted_    ------------------------ ---------- ------------ $283, 000. 00 -100,000.00-


Balance unexpended July 1, 1936-----------------------------         $114, 810.70
Gross amount expended__---_____-___-          -______$114, 953.20
Less reimbursement collected                               142. 50
                                                           1-----------------------
                                                                       114, 810. 70
   CONSOLIDATED         COST AND FINANCIAL                    SUMMARY            FOR EAST     CHESTER CREEK,         N.   Y.

Cost of new work to June 30, 1937_____________________________ $382, 619. 79
Cost of maintenance to June 30, 1937____-----   _____________ 165, 023. 65
        Total cost of permanent work to June 30, 1937                                                            547, 643. 44
Net total expenditures_-___
                         .    -__---
                                 ____ ___ -- __     -____-____547, 643. 44
Unexpended balance June 30, 1937-- ______-______--_____-   -_  45, 904. 08
        Total amount appropriated to June 30, 1937----------------593,                                                 547.52

        Fiscal year ending June 30                          1933              1934         1935          1936          1937

Cost of new work....-----------------------                 $264. 35 ---                ......_-_..  $102, 833. 84   $80, 166. 16
Cost of maintenance.---     -----------------                            --              $11, 195.92
Total expended.......              ....-------------------------264.35   ------------    11,01315      68, 372.07    114, 810. 70
Allotted.-------------------------------                     247. 52                    297, 100.00 -50,000.00
                                                                              .-----------                           -7,000. 00

Balance unexpended July 1, 1936 _..___________ ___ ________ $167, 714.78
Deductions on account of revocation of allotment_____________   7, 000. 00
      Net amount to be accounted for--------------------------                                                   160, 714. 78
Gross amount expended__--------------------------    $115, 067. 57
Less reimbursements collected_________-
                                     -    ------           256. 87
                                                                                                                 114, 810. 70

      Balance unexpended June 30, 1937________________--___                                                      '45, 904.08
Amount (estimated) required to be appropriated for completion of
existing project-_-------------------------------- ---                                                          100, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work-_--------                   --------                                                     100, 000. 00
  Revoked during July 1937.
150     REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY, 1937

                   6. WESTCHESTER CREEK, N. Y.

   Location.-This creek is a tidal stream flowing into the East River
from the north at a point 14 miles by water northeast of the Battery,
New York City. (See U. S. Coast and Geodetic Survey Chart No.
226.)
   Previous projects.-Adopted by the River and Harbor Act of
June 25, 1910. The total cost and expenditures were $143,781.78-
$77,181.64 for new work and $66,600.14 for maintenance. (For fur-
ther details see p. 238 of Annual Report for 1921.)
   Existing project.-This provides for a channel 12 feet deep at
mean low water, 100 feet wide for a length of 2,000 feet through
the estuary; thence 80 feet wide for 3,000 feet ; and thence 60 feet
wide to the head of navigation at East Tremont Avenue (Fort
Schuyler Rd.), a distance of 8,800 feet, with widening at bends,
and with two turning basins, one near the upper end of the channel
and another near the Eastern Boulevard (Unionport) Bridge, a
total length of about 25/8 miles. Mean tidal range, 7 feet ; mean range
of spring tides, 8.3 feet; irregular fluctuations due to wind and baro-
metric pressure vary from 4 feet below mean low water up to 3.5
feet above mean high water.
   The estimate of cost for new work, revised in 1932, was $117,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act
approved September 22, 1922 (H. Comn. Doc. No. 8, 67th Cong., 2d
sess.). The latest published map is printed in House Document No.
370, Sixty-fourth Congress, first session.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Water terminals, 16 in number, with avail-
able dockage of 3,130 feet, are located -7 in the vicinity of East-
ern Boulevard, 2 about midway between Eastern Boulevard
 (Unionport) Bridge and East Tremont Avenue (Fort Schuyler
Rd.), and 7 in the upper 1,200 feet of the projected channel.
The facilities appear to be adequate. (For further details see Port
Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1933, at a saving of $18,333 under the estimated cost. When
examined in September 1936 the controlling depth at mean low
water from the entrance in the East River to a point 400 feet south
of East Tremont Avenue was 10 feet for a width of 30 to 100 feet;
thence to the head of the project, at East Tremont Avenue, it was 7
feet for a width of 60 to 80 feet. The total cost and expenditures
of the existing project to June 30. 1937, were $98,699.09-$98,666.88
for new work and $32.21 for maintenance.
   Proposed operations.-There were no funds available for this proj-
ect at the end of the fiscal year. An allotment of $30,000, made in
July 1937, will be applied to completion of maintenance dredging
by June 1, 1938, under a contract to be entered into for the removal
of shoals which have formed in the channel from the East River to
the head of the project.
       RIVERS AND HARBORS--FIRST                                NEW YORK, N. Y.. DISTRICT                                     151
  It is believed that further maintenance dredging will not be neces-
sary during the next 2 years. Therefore, no funds can be profitably
expended during the fiscal year ending June 30, 1939.
                                        Cost aIld finar('ial slnJJJ()ary

Cost of new work to June 30, 1937__                                                                              $175,  848. 52
                                                                                                                 $__________------------
Cost of maintenance to June 30, 1937---------                                       -----------                     66, 632. 35

           Total cost of permanent work to June 30, 1937--                                                           242, 480. 87
Net total expenditures-----------------                                   -    - -                                   242, 480. 87
Total amount appropriated to June 30, 1937------------------                                                         242, 480. 87

           Fiscal year ending June 30                1933          1934             1935              1936                1937


Cost of new work-      -    -   -   -    -   -   $16, 982. 96    $1, 228. 05                      -          -
Cost of maintenance
Total expended      -49,                             494. 17      1, 241. 81          $0. 61 ...                 .        -   -
Allotted               -_                        -16, 025. 25     1,225. 62 _ _ _ _

Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937_  __-- -______-____----------                                                                  $30, 000. 00
Amount available for fiscal year 1938--__________                              _-             -----                   30, 000. 00

                                        7. BRONX RIVER, N. Y.

   Location.-This stream empties into a shallow bay in the north
shore of East River, 11-.miles by water northeast of the Battery, New
York City. (See U. S. Coast and Geodetic Survey Chart No. 226.)
   Previous project.-Adopted by the River and Harbor Act of June
3, 1896. The total cost and expenditures were $95,957.05-$69,035.72
for new work and $26,921.33 for maintenance. For further details
see Annual Report for 1915, page 1762.
   Existing project.-This provides for a channel 10 feet deep at
mean low water and a minimum bottom width of 100 feet, with
widening at the bends, to extend from deep water in East River
to the head of navigation at the dam at East One Hundred and
Seventy-seventh Street, involving the first dredging from East River
to Randall Avenue to a width of 200 feet; thence to Spofford Ave-
nue, 150 feet; thence to Watson Avenue, 125 feet; thence to the
railroad bridge near Westchester Avenue, 100 feet, except in the
southern approach to the bridge, where it is to be 140 feet; and
above the bridge 100 feet, with increase at bends where permissible,
including a turning basin at the head of the improvement. It also
provides for maintaining the channel excavated under the project
adopted June 3, 1896, until the channel provided for under the
existing project is open to traffic to the railroad bridge. The length
of the section included in the project is about 31/4 miles. Mean tidal
range, 6.9 feet in the estuary; mean range of spring tides, 8.2 feet;
irregular fluctuations due to wind and barometric pressure vary from
4 feet below mean low water up to 3.5 feet above mean high water.
   The estimate of cost for new work, revised in 1928, is $2,700,000,
exclusive of the amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $7,500.
152     REPORT OF CHIEF OF ENGINEERS,       U. S. ARMY, 1937


   The existing project was adopted by the River and Harbor Act of
March 4, 1913 (H. Doc. No. 897, 62d Cong., 2d sess.). For latest
i)ublished map see Annual Report for 1912, page 1470.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Water terminals, 18 in number, with avail-
able dockage of 7,300 feet, are located-1 at the mouth, 17 along
the east and west banks for about 23/4 miles above the mouth to
the upper limits of the projected channel.
   Additional terminals with modern facilities will be needed when
the existing project is developed. (For further details see Port
Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 10 feet from 2,400 feet above the junction
with East River to the Westchester Avenue Bridge, for maintenance,
work was commenced November 18, 1936, and was completed June
14, 1937. There was removed during the fiscal year a total of 103,077
cubic yards, place measurement, of material at a cost of $53,490.54.
   The cost of a survey preliminary to dredging was $1,203.73, for
maintenance. The total cost was $54,694.27, all for maintenance.
The expenditures were $48.843.37.
   Condition at end of fiscal year.-The existing project is about 29
percent completed. The channel provided for under the existing
project was completed from deep water in East River up to the
highway bridge at Westchester Avenue in 1926. Above this no work
will be done under the existing project until the bridge at West-
chester Avenue has been replaced by the city of New York with a
new structure. When examined in February to June 1937, the con-
trolling mean low-water depth was 10 feet, from East River to a
point 700 feet south of the Westchester Avenue Bridge except for
several small shoals along the channel lines having a limiting depth
of 6 feet; thence to the Westchester Avenue bridge decreasing from
9 feet to 5 feet just south of the bridge. When examined in May
1934, the controlling mean low-water depth in the channel excavated
under the previous project was 5 feet for a width of 50 to 30 feet
from the Westchester Avenue bridge to a point about 300 feet above
the New York, New Haven & Hartford Railroad bridge; thence to
about 500 feet below the dye works near the head of the projected
improvement the depth gradually reduces to zero. Above this to the
head of improvement the bottom is exposed at mean low water and
rises to an extreme height of about 4.5 feet above mean low water
just below the dam. To complete the project the channel above the
Westchester Avenue highway bridge must be excavated to project
dimensions by dredging and rock removal.
   The total cost of the existing project to June 30, 1937, was
$979,035.80-$797,803.65 for new work and $181,232.15 for mainte-
nance. The total expenditures amounted to $974,127.82.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $14,156.63, less accounts payable amounting
to $4,907.98, is available for revocation.
   The work necessary to carry the improvement above the West-
chester Avenue bridge has been deferred until the city of New York
shall have replaced the existing Westchester Avenue high bridge
with one suited to the enlarged channel.
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                          153
  It is believed that further maintenance dredging will not be neces-
sary during the next 2 years. Therefore, no funds can be profitably
expended during the fiscal year ending June 30, 1939.
                                  Cost and financial summary
Cost of new work to June 30, 1937--------------------------                            $866, 839. 37
Cost of maintenance to June 30, 1937-------------------------                           208, 153. 48

      Total cost of permanent work to June 3, 1937------------1, 074, 992. 85
Minus accounts payable June 30, 1937-------------------------      4, 907. 98

     Net total expenditures ------   --------                                       1, 070, 084. 87
Unexpended balance June 30, 1937---------------------------                             14, 156. 63

         Total amount appropriated to June 30, 1937-----------                      1, 084, 241. 50

        Fiscal year ending June 30               1933     1934     1935         1936            1937


Cost of new work...---------------------------
Cost of maintenance.______---__--_-_-__-_-_---_---_------ .        $844. 56     $839. 40      $54, 694.27
                          ----
Total expended .._ .........     ......       ____ _________        321. 17    2, 345. 71      48, 843. 37
Allotted-....----------------------------------------20, 000. 00              22, 666. 88      23, 000. 00


Balance unexpended July 1, 1936-                                                        $40, 000. 00
Amount allotted from War Department Appropriatio )n Act ap-
proved Apr. 9, 1935-                                                                       23, 000. 00
                                                                   --
      Amount to be accounted for--------------                                              63, 000. 00
Gross amount expended--______-----          __                   ____                       48, 843. 37
     Balance unexpended June 30, 1937_                                                      14, 156. 63
Amount covered by uncompleted contracts_                                                     4, 907. 98
        Balance available June 30, 1937-__--                                                 9, 248. 65

Amount (estimated) required to be appropriated for completion
                            _             _
  of existing project 1 ___                    ___---                     -         1, 900, 000. 00
  1 Exclusive of available funds.

                         8. HARBOR AT FLUSHING BAY, N. Y.

   Location.-Flushing Bay is located on the north shore of Long
Island, 12 miles by water northeast of the Battery, New York City.
This harbor is a tidal waterway consisting of Flushing Creek, a nar-
row stream about 1 mile long, which empties into a shallow bay 2
miles long and 300 feet to 1.4 miles wide. (See U. S. Coast and
Geodetic Survey Chart No. 226.)
   Previous projects.--Adopted by River and Harbor Acts of March
3, 1879, and March 4, 1913. The total cost and expenditures were
$445,284.38-$238,872.91 for new work and $206,411.47 for mainte-
nance. (For further details see Annual Report for 1915, p. 1772,
and for 1932, p. 169.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water from that depth in East River through Flushing Bay and
in Flushing Creek to the Main Street Bridge, with widths of 200
feet through the bay and in the creek to the Northern Boulevard
Bridge, thence decreasing uniformly to 160 feet at the Main Street
154     REPORT OF CHIEF OF) ENGINEERS,       1U. S. ARMY, 1937


Bridge; a branch channel 12 feet deep and 200 feet wide from the,
main channel to a maneuvering area of the same depth outside the
proposed municipal boat basin at the south end of the bay, with an
anchorage basin of 8-foot depth and approximately 700-foot width
west of the branch channel; and for the construction of about 1,300
linear feet of new dike and repairs to 3,345 linear feet of old dike.
The length of the section included in the project is about 15,000 feet-
about 5,000 feet in the creek and about 10,000 feet in the bay. Mean
tidal range, 6.8 feet; mean range of spring tides 8.3 feet; irregular
fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water up to 3.5 feet above mean high water.
   The estimate of cost for new work revised in 1937 is $617,000, ex-
clusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1925, provided for the 12-foot chan-
nel in Flushing Bay and Creek (H. Doc. No. 124, 68th Cong., 1st
sess.) and the act of August 26, 1937, provided for the branch
channel, maneuvering area, and anchorage basin and modified the
conditions of local cooperation with respect to the main channel in
the bay and creek (Rivers and Harbors Committee Doc. No. 35, 75th
Cong., 1st sess.). The latest published map is in the last-named
document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that the branch channel and anchorage shall not be con-
structed until local interests give assurances satisfactory to the Sec-
retary of War that they will construct a suitable landing for excur-
sion boats and a boat basin of appropriate capacity, provide and
maintain a public landing of permanent construction for small boats,
with necessary service and supply facilities, provide adequate park-
ing spaces for automobiles in the immediate vicinity suitably con-
nected to the public highway system and open to the public on equal
terms; and that no dredging shall be done in the Flushing Creek
Channel closer than 100 feet to the established harbor line at any
wharf structure without previous consent of the owner and release
of the United States from any resultant claims for damages.
   Terminal facilities.--Water terminals, 17 in number, with avail-
able wharfage of 4,490 feet are located-15 along the east bank and
2 on the west bank-within the limits of the adoptedproject. The
facilities are considered adequate for existing commerce. (For fur-
ther details see Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 10 feet from deep water in Flushing Bay to
Broadway Bridge, thence 7 feet to Main Street Bridge, work was
commenced on August 6, 1936, and completed on January 21, 1937.
There was removed during the fiscal year a total of 150,338 cubic
yards, place measurement, of material at a cost of $84,367.38, all for
maintenance under the previous project. The expenditures were
$84,281.65.
   Condition at end of fiscal year.-No work has been done under the
existing project and there have been no costs or expenditures. The
controlling mean low-water depth in the main channel was 10 feet
for a width of 200 feet from entrance in East River to Northern
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                       155

Boulevard Bridge when examined in December 1936; thence 8 feet
for a width of 50 to 160 feet to Main Street Bridge when examined
in September 1936; and 0.5 foot in the branch channel, maneuvering
area, and anchorage area, when examined in April 1937.
   Proposed operations.- There were no funds available for this
project at the end of the fiscal year. It is expected that the condi-
tions of local cooperation will be complied with in time to commence
work under the existing project during the fiscal year 1938. An
allotment of $505,000 made during the fiscal year 1938 will be applied
to the completion of dredging, under contract to be entered into for
new work, of the entrance, creek, and branch channels, the maneuver-
ing area, and anchorage area to project dimensions as authorized by
the River and Harbor Act of August 26, 1937.
   The construction of about 1,300 linear feet of new dike is not con-
sidered necessary, nor will maintenance dredging be necessary during
the next 2 years. Therefore no funds can be profitably expended
during the fiscal year ending June 30, 1939.
                                        Cost and financial summary
Cost of new work to June 30, 1937  _------                                                          $238, 872. 91
Cost of maintenance to June 30, 1937-                                                                206, 411. 47

           Total cost of permanent work to June 30, 1937                                             445, 284. 38
Net total expenditures-----                 --                                                       445, 284. 38
Total amount appropriated to June 30, 1937_                                                          445, 284.38

           Fiscal year ending June 30                1933           1934         1935        1936            1937


Cost of new work--                                                    -----
Cost of maintenance_                                            __-__------      $123.30   $1,812.37       $84,367.38
Total expended             -   --                                                 60.04     1,961. 36       84, 281.65
Allotted            - _-       -                 -$5, 907. 34   -    -----------
                                                                          40, 000. 00      72, 000. 00     -25, 696. 95


Balance unexpended July 1, 1936----------------------------                                         $109, 978. 60
Deductions on account of revocation of allotment-        ---                                          25, 696. 95

           Net amount to be accounted for --------------------------                                     84, 281. 65
Gross amount expended_-                                               --                                 84, 281. 65

Amount (estimated)                  required to be appropriated for completion
   of existing project-__                                                                           '112, 000. 00
   1Exclusive      of $505,000 allotted      since June 30,         1937.

                                    9. HEMPSTEAD            HARBOR,           N. Y.

   Loccation.-This is an indentation of the north shore of Long
Island, 25 miles by water northeast of the Battery, New York City,
and 13 miles southwest of Stamford Harbor, Conn. (See U. S.
Coast and Geodetic Survey Chart No. 223.)
   Existing project.-This provides for dredging a channel 6 feet deep
at mean low water and 100 feet wide from the entrance to a point
opposite Ward's wharf, a distance of about 5,600 feet; thence 80 feet
wide to the Roslyn town wharf, a distance of about 3,200 feet; and
thence 50 to 70 feet wide to the head of navigation, a distance of
about 1,700 feet. Total length of channel included in the project is
2 miles. Mean' tidal range, 7.3 feet; mean range of spring tides,
 156              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

8.6 feet; irregular fluctuations due to wind and barometric pressure
vary from 4 feet below mean low water up to 4.5 feet above mean
high water.
   The estimate of cost of new work, made in 1910, was $47,000. The
latest (1910) approved estimate for annual cost of maintenance is
$3,000.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910 (Rivers and Harbors Committee Doc. No. 1, 61st
Cong., 2d sess.). There is no published map.
   Local cooperation.-Fully complied with.
   Terminal facilities.--Water terminals, nine in number, with avail-
able dockage of 2,700 feet, are located-eight along the east shore of
the harbor from Glen Cove to Roslyn and one on the west shore;
none has railroad connection. The facilities are considered adequate
for existing commerce, which is local, and there is ample water front,
both public and private, for extensions as needs arise.
   Operationsalnd results during fiscal year.-None. The expenditures
were $6.16 for the payment of accounts payable at the beginning
of the fiscal year.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913 at a saving of $7,532 under the estimated cost. The
controlling mean low-water depth, as shown by survey made in Janu-
ary 1935 and April-May 1936, was 6 feet from the entrance to the
head of the improvement for the full project widths.
   The total cost and expenditures of the existing project to June 30,
1937, were $105,405.34-$39,468.11 for new work and $65,937.23 for
maintenance.
   Proposed operations.-There are no funds available for this proj-
ect, and no work is contemplated during the fiscal years 1938 and
1939.
                                               Cost and financial summary
Cost of new work to June 30, 1937___$-------- __        ______-$39, 468. 11
Cost of maintenance to June 30, 1937-------------------------65, 937. 23
      Total cost of permanent work to June 30, 1937_______
                                                       -__105,        405. 34
Net total expenditures_---------------          ---------------- 105, 405. 34
Total amount appropriated to June 30, 1937-------------------105, 405. 34

           Fiscal year ending June 30                               1933      1934         1935        1936             1937


Cost of new w ork - . _. . . . . . . . . . . . . . . . . . . . . . . . . . .                                        .     .     .
Cost of maintenance--------------..................... -- -------- ------------ ----------- $15, 961. 44
Total expended------------------.......................-------------         _ .---------
                                                                                      ------------ 15, 955. 28                $6. 16
Allotted_          -------------------------------------------------------                           17, 000. 00   -1, 038. 56


Balance unexpended July 1, 1936__-----------------------------$1, 044. 72
Deductions on account of revocation of allotment --------- __   1, 038. 56
      Net amount to be accounted for   __-------------------                                                              6. 16
Gross amount expended --------- __ ______-__________         -                                                            6. 16
                                           10. GLENCOVE CREEK, N. Y.

  Location.-This is a narrow tidal inlet extending eastwardly about
1 mile from the east side of Hempstead Harbor on'the north shore
    RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT               157


of Long Island, 26 miles northeast of the Battery, New York City.
 (See U. S. Coast and Geodetic Survey Chart No. 223.)
    Existing project.-This provides for a channel 100 feet wide and
8 feet deep at mean low water from deep water in Hempstead Har-
bor, to the head of navigation at the city of Glen Cove, a total length
of about 5,000 feet, to be protected by a sand fence along its north
side where it crosses the beach. Mean tidal range 7.3 feet; mean
range of spring tides, 8.6 feet; irregular fluctuations due to wind
and barometric pressure vary from 4 feet below mean low water up
to 4.5 feet above mean high water.
    The estimate of cost for new work (of which one-half is to be
borne by local interests), revised in 1934, is $109,000, with $6,000
the first year and $4,000 annually thereafter for maintenance.
    The existing project was adopted by the River and Harbor Act
of March 3, 1925 (H. Doc. No. 207, 68th Cong., 1st sess.). The latest
published map is in the project document.
    Local cooperation.-The River and Harbor Act of March 3, 1925,
provides that local interests shall pay one-half of the first cost of the
work, provide without cost to the United States all rights-of-way,
spoil-disposal areas, and bulkheads, and give assurances satisfactory
to the Secretary of War that adequate terminals will be built.
Complied with as to contribution of one-half of first cost of work
done to date, cession of rights-of-way, provision of disposal areas,
and the construction of terminals. Pending construction of bulk-
heads by local interests, along the southerly side of the channel in
the upper 1,600 feet of the improvement, a channel of less than
project width has been excavated.
    I erminal facilities.-There are five terminals at present which
are considered adequate for present needs. There is ample water
front, both public and private, for extensions as needs arise.
    Operations and results during fiscal year.-None.
    ('onrdition at end of fiscal year.-The existing project is about 55
percent completed. The work done provided a channel 100 feet in
width from deep water in Hempstead Harbor for a distance of 3,470
feet, thence gradually decreasing to 50 feet in width for a distance
of 180 feet, and 50 feet in width for a distance of about 1,450 feet
to the head of improvement. When examined in March 1937, the
controlling mean low-water depth was 8 feet through a navigable
channel varying from 100 feet wide at the mouth to 30 feet wide at
the head of improvement. The work remaining to be done to com-
plete the existing project consists in widening to 100 feet the upper
1,630 feet of channel and building a sand fence along the north side
of channel where it crosses the beach. The total cost and expendi-
tures to June 30, 1937, were $59,548.21, all for new work, of which
$29,774.10 were United States funds and $29,774.11 contributed funds.
    Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $6,000, was revoked during July 1937.
    Completion of this project is not considered necessary during the
next 2 years. Shoaling is occurring near the entrance from Hemp-
stead Harbor to the head of the improvement. Therefore, the sum
of $6,000 can be profitably expended, under contract for maintenance,
during the fiscal year ending June 30, 1939, to restore the chanlnel to
tilhe depths previously made.
158            REPORT' OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                          Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                         1$29, 774. 10
Cost of maintenance to June 30, 1937
           Total cost of permanent work to June 30, 1937______________                                      29, 774. 10
     Net total expenditures ----------------------------------- 129, 774. 10
Unexpended balance June 30, 1937 ------------------------------   6,000.00
           Total amount appropriated to June 30, 1937________________                                     135, 774.10

           Fiscal year ending June 30                1933          1934          1935           1936                 1937


Cost of new work ....                     -      _              $26, 566. 60   $3, 207. 50
Costof maintenance .                             .          .         .   .              .
                                                                                        -.              .       .        .
                                                                                                                       -..

T otalexpended              ........
                      ........   .      ......... ....
                                     ......                      29,321.60        452.50
Allotted      ---           -
                           ....   -----                          57, 300. 00 -27, 525. 90    $6, 000. 00..........


Balance unexpended July 1, 1936--                                --                                         $6, 000. 00
Balance unexpended June 30, 1937_                                                                           26,000. 00
Amount        (estimated) required to be appropriated for completion
  of existing project 3_______________________________________                                              24, 700. 00
Amount that can be profitably expended in fiscal year ending June
   30,     1939, for maintenance__               ___-______---___                                            6, 000. 00
  1 In addition, $29,774.11, was expended from "Contributed funds."
  2 Revoked during July, 1937.
  3In addition, $24,700 is to be contributed by local interests.


                                  11. MATTITUCK HARBOR, N. Y.

   Location.-This is a tidal inlet on the north shore of Long Island,
85 miles east of the Battery, New York City, and 24 miles southeast
of New Haven Harbor, Conn., extending southward about 21/4 miles
to the village of Mattituck. (See U. S. Coast and Geodetic Survey
Chart No. 299.)
   Existing project.-This provides for a channel 7 feet deep at mea
low water from Long Island Sound to the mill dam (removed in 1913
and replaced by a bridge with a draw span) protected at the entrance
by two parallel jetties 400 feet apart, thence 7 feet deep at mean high
water (3.5 feet at mean low water) to the village, the widths being
100 feet at the entrance and 80 feet elsewhere. Total length of the
channel is about 11,500 feet. Mean tidal range at entrance, 4.4 feet;
at Mattituck, probably about 3.5 feet; mean range of spring tides at
entrance, 5.2 feet; irregular fluctuations due to wind and barometric
pressure vary from 2.5 feet below mean low water up to 2.5 feet
above mean high water.
   The estimate of cost for new work, revised in 1935, including the
cost of maintenance up to June 30, 1909, is $125,000. The latest
 (1935) approved estimated cost of annual maintenance is $5,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896 (Annual Report, 1891, p. 843),
provided for the 7-foot channel and two riprap jetties; the act of
August 30, 1935 (H. Doc. No. 8, 71st Cong. 1st sess.),rovided for a
250-foot extension to the west jetty. The latecst publishelcd map is
in the last-mentioned document.
      RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                         159
  Local cooperation.-Fully complied with.
   Terminal facilities.-There is one small landing with 150 feet of
available dockage, open to general use, and several private trestles
at which landings are made. The landing is of light construction,
being built of stakes; it is removed each year about November 1 and
rebuilt about April 1. The commerce is of such a light nature that
much of it can be handled from small boats run up on the shore.
These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The cost of surveys pre-
liminary to repair of the west jetty was $542.73, for maintenance.
The expenditures were $691.11.
   Condition at end of fiscal year.-The existing project is 76 percent
completed. The dredging and west jetty were completed in 1914; the
west jetty was 1,300 feet long, and the east jetty was 775 feet long.
As shown by surveys made in May 1936 and May 1937, the controlling
mean low-water depth was 7 feet through a channel 100 feet wide
from the entrance to the bridge at Waterville. In July 1928, the
controlling mean low-water depth was 21/2 feet from the bridge up
to Long Creek; thence to the village of Mattituck it was 1 foot deep.
The work remaining to be done to complete the project consists in
extending the east jetty to the 9-foot contour, and the west jetty
250 feet.
  The total cost to July 30, 1937, was $201,823.60-$94,956.40 for new
work and $106,867.20 for maintenance. The expenditures were
$201,967.23.
  Proposedoperations.-The balance unexpended, including accounts
receivable, at the end of the fiscal year, amounting to $49,191.34, will
be applied as follows:
Accounts payable June 30, 1937-------------------------------           $191. 34
New work: Complete by June 15, 1938, under a contract to be entered
  into, the construction of a 250-foot extension to the west jetty__. 30, 000. 00
Maintenance: Complete by June 15, 1938, under a contract to be en-
  tered into, the repair of the outer 400 feet of the existing west
jetty ------------------------------------                           19, 000.00
        Total --------------------------------------------                 49, 191. 34
  This work will complete the extension to the west jetty as author-
ized in 1935 and restore the outer 400 feet of the existing structure
to its original condition. Further maintenance dredging will not
be necessary during the next 2 years. Further repairs to the existing
west jetty will be necessary during the fiscal year 1939. The sum
of $20,000 can therefore, be profitably expended under contract, for
maintenance, during the fiscal year ending June 30, 1939.
                                   Cost and financial summary
Cost of new work to June 30, 1937---------------------_____ $94, 956.40
Cost of maintenance to June 30, 1937________------____-----------_ 106, 867. 20
      Total cost of permanent work to June 30, 1937------------          201, 823. 60
Undistributed costs June 30, 1937----------     ----------------              273. 95
      Net total cost to June 30, 1937---------------------        _      202, 097. 55
Plus accounts receivable June 30, 1937 ------------              ----- _       61. 02
       Gross total costs to June 30, 1937 ------------          --      - 202,158.57
       20196--37-pt. 1-           11
160          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                   ---
Minus accounts payable June 30, 1937______ _____                                             -______---                 $191. 34

      Net total expenditures_ _--_--_-------------------                                                             201, 967. 23
Unexpended balance June 30, 1937___-----------------------                                                --          49,130. 32

        Total amount appropriated to June 30, 1937                                           ------                  251,097. 55

        Fiscal year ending June 30                  11933                  I    1934     I    1935         1936           1937


Cost of new work--   -----------
                          -        ------       --     ---------------------------------
Cost of maintenance___-----------------   --- ----------- ------------ ---- ---- -- $22, 247. 49                           $542.73
Total expended---       ------------------------------------------------                                22, 242. 74         691. 11

Allotted------------------------------------------ ------------ ----------                              72, 064.17..........


Balance unexpended July 1, 1936----------------------------                                                          $49, 821.43
Gross amount expended-------------------------------------                                                                691. 11
      Balance unexpended June 30, 1937------------------                                                              49, 130. 32
Outstanding liabilities June 30, 1937__-------___-----------------                                                        191. 34
      Balance available June 30, 1937_ ___________                                               ___-------      .    48, 938. 98
Accounts receivable June 30, 1937__--------- ------                                                            __          61. 02
        Unobligated balance available June 30, 1937-------                                                __--49, 000. 00

Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance ._                      ________                   _______                                20, 000. 00
  1
    Exclusive of available funds.

                               12. GREENPORT HARBOR, N. Y.

   Location.-This harbor is situated on the northerly side of Shelter
Island Sound, at the eastern end of Long Island, about 28 miles by
water southwest of New London, Conn., and 118 miles by water east
of the Battery, New York City. (See U. S. Coast and Geodetic
Survey Chart No. 298.)
   Existing project.-This provides for a breakwater extending
southerly from Joshua Point for a distance of 1,570 feet, an anchor-
age area 1,000 feet long, 360 feet wide, and 8 feet deep at mean low
water in Sterling Basin, and an entrance channel of the same depth
and 100 feet wide connecting the anchorage with deep water in the
outer harbor. Length of section included in this project is 1,750
feet. Mean tidal range, 2.4 feet; mean range of spring tides, 2.8
feet; irregular fluctuations due to wind and barometric pressure vary
from 2 feet below mean low water to 2 feet above mean low water.
   The estimated cost for new work, revised in 1937, is $98,000. The
latest (1937) approved estimate of cost of annual maintenance is
$750.
   The existing project was authorized by the following river and
harbor acts: The act of August 2, 1882 (S. Ex. Doc. No. 84, 47th
Cong., 1st sess.) provided for the construction of the breakwater,
and the act of August 26, 1937, provided for the anchorage in Ster-
ling Basin and the approach channel thereto (Rivers and Harbors
Committee Doc. No. 88, 74th Cong., 2d sess.). The latest published
map is in the latter project document.
   Local cooperation.-TheRiver and Harbor Act of August 26, 1937,
provided that local interests shall furnish, without cost to the United
States, adequate and suitable spoil disposal areas and give assurances
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y.,,DISTRICT                    161

satisfactory to the Chief of Engineers that a suitable public landing
on the basin shore and moorings in the dredged area for visiting
craft will be provided and maintained open to the public on equal
and reasonable terms. These provisions have not been complied
with.
  Terminal facilities.-Water terminals, 27 in number with available
wharfage of 9,450 feet are located as follows: 3 in Sterling Basin
and 24 in Greenport Harbor proper. All the terminals are pri-
vately owned, of which three are open to the public. One terminal
has rail connections.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project is about 45
percent completed. The breakwater was completed in 1891. When
examined in September 1935, the controlling depth at mean low
Water in the approach channel was 6 feet for a width of 100 feet,
and in the anchorage in Sterling Basin was 2 feet. The work
remaining to be done to complete the existing project consists in
excavating the approach channel and anchorage as authorized by the
River and Harbor Act of 1937.
  The total cost and expenditures were $44,715.98, all for new work.
  Proposed operations.-There are no funds available for this project
and no work is contemplated during the fiscal year 1938. It is ex-
pected that the conditions of local cooperation will not be complied
with during the next 2 years. Maintenance repairs to the breakwater
will not be necessary during the next 2 years. Therefore, no funds
can be profitably expended during the fiscal year ending June 30, 1939.
                        Cost and financial summary

Cost of new work to June 30, 1937_____________________________      $44, 715. 98
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937____     _____    44, 715. 98
Net total expenditures-----       ------------------                 44, 715.98
Total amount appropriated to June 30, 1937      -      __            44, 715. 98
Amount (estimated) required to be appropriated for completion
of existing project---------------   ----------------------         54,000. 00
                        13. PECONIC RIVER, N. Y.

   Location.-This is a narrow tidal stream near the intersection of
the north and south forks of Long Island, 74 miles east of the Battery,
New York City, extending westwardly about 3 miles to a dam near
Peconic Avenue in the village of Riverhead. (See U. S. Coast and
Geodetic Survey Charts Nos. 299 and 1212.)
   Existing project.-This provides for a channel 6 feet deep at mean
low water and 75 feet wide for a distance of about 23/4 miles to the
Terry and Wells dock, about 1,100 feet below Peconic Avenue. Mean
tidal range, 2.4 feet; mean range of spring tides, 2.8 feet; irregular
fluctuations due to wind and barometric pressure vary from about 3
feet below mean low water to about 3 feet above mean high water.
   The estimate of cost for new work made in 1871 is $32,818.50.
There is no estimate for cost of annual maintenance.
   The existing project was adopted by the River and Harbor Act of
March 3, 1871 (H. Ex. Doc. No. 60, 41st Cong., 3d sess.). There
is no published map.
162           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.-Water terminals, nine in number, with avail-
able wharfage of 1,215 feet are located-four along the north bank
and five on the south bank-within the limits of the adopted project.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 6 feet for maintenance, work was commenced
March 6, 1936, and completed August 1, 1936. There was removed
during the fiscal year a total of 34,050 cubic yards of material, place
measurement, at a cost of $11,869.84, for maintenance. The ex-
penditures were $16,803.41.
   Condition at eid of fiscal year.-The existing project is about 76
percent completed. When examined in August 1936 the controlling
mean-low-water depth was 6 feet for a width of 60 feet from the
mouth to the head of the project. The work remaining to be done
to complete the existing project consists in dredging the channel to
a depth of 6 feet at mean low water for the full project width of 75
feet, from Peconic Bay to the head of the project.
  The total cost and expenditures to June 30, 1937, were $55,184.57-
$25,000 for new work and $30,184.57 for maintenance.
  Proposedoperations.-There are no funds available for this project,
and no work is contemplated during the fiscal years 1938 and 1939.
                                        Cost and financial summary

Cost of new work to June 30, 1937    --------------------------- $25, 000. 00
Cost of maintenance to June 30, 1937________--_______________     30, 184.57

      Total cost of permanent work to June 30, 1937-----------                                               55, 184. 57
Net total expenditures------------------------------------                                                   55, 184. 57
Total amount appropriated to June 30, 1937------- ______--___                                                55, 184. 57

         Fiscal year ending June 30                1933            1934                1935      1936            1937


Cost of new work
Cost of maintenance_ .......
                                  --------
                                   .
                                              I-----------------
                                             ________      _
                                                                     ------------
                                                               _________        __________    $18,314.73       $11,869.84

Total expended-_     _..   -..-
                              .....-.         -                -                               13, 381. 16      16, 803.41

Allotted .   --.------                                         .          ---- ............    30,184. 57


Balance unexpended July 1, 1936--        ------------------------- $16,803.41
Gross amount expended-------------------------- $16, 869. 11
Less reimbursements collected ----------           ___65.        70
                                                              6____-
                                                                     16, 803. 41

Amount (estimated) required to be appropriated for completion
of existing project--   ------------------------------------ 7, 800. 00
                                        14. SAG HARBOR, N. Y.

  Location.-This harbor is located on the northern shore of the
south fork of Long Island, about 24 miles west of Montauk Point.
(See U. S. Coast and Geodetic Survey Chart No. 298.)
  Existing project.-This provides for a breakwater 3,180 feet long
extending northerly from Conklin Point; and for an entrance chan-
nel 3,200 feet long, 100 feet wide, and 10 feet deep at mean low water
from Shelter Island Sound by way of the village wharf to the moor-
ing dolphins of the Standard Oil Co.; for a turning basin of the
    RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                    163
same depth; for an anchorage area 8 feet deep at mean low water
between this channel and the breakwater; and for a small anchorage
area 6 feet deep at mean low water between the village wharf and
the Sag Harbor Yacht Club pier. The length of the section in-
cluded in the project is about five-eighths mile. Mean tidal range,
2.3 feet; mean range of spring tides, 2.9 feet; irregular fluctuations
are infrequent and do not materially affect navigation.
   The estimate of cost of new work, revised in 1935, is $119,100.
The latest (1935) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 13, 1902 (Ex. Doc. No. 1, 52d Cong., 1st
sess.), provided for the construction of a breakwater; the act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 32, 74th
Cong., 1st sess.), provided for dredging the channel, anchorages,
and turning basin. The latter document contains the latest pub-
lished map.
   Local cooperation.-The River and Harbor Act of August 30,
1935, required that local interests provide suitable public wharf and
dock facilities and furnish, free of cost to the United States, suitable
areas ashore for the disposal of dredged materials. Compliance
with conditions of local cooperation accepted as satisfactory by the
Chief of Engineers October 5, 1936.
   Terminal facilities.-The terminal facilities served by the im-
provement, consisting of three wharves aggregating 1,500 feet, are
open to the public. A pier 390 feet long is available for landing
pleasure boats, and mooring dolphins serve to tie up oil barges.
The above terminals are not equipped with freight-handling devices.
   Operations and results during fiscal year.-Under a contract for
dredging to depths of 10, 8, and 6 feet in the entrance channel,
anchorage area and small anchorage area, respectively, work was
commenced May 20, 1937, and was in progress at the end of the fiscal
year. During this period the contractor was engaged in the construc-
tion of dikes and other work preliminary to dredging operations.
The cost of surveys and contingencies preliminary to the dredging was
$1,938.73, for new work. The expenditures were $1,298.08.
   Condition at end of fiscal year.-The existing project is about 52
percent completed. A stone breakwater, approximately 3,180 feet
in length, was completed in 1908. When examined in September 1934
and March 1937 the controlling mean low water depth in the entrance
channel was 9 feet; in the turning basin, 8 feet; in the interior
channel, 4 feet; in the southerly anchorage area, 3 to 4 feet; and
in the main anchorage, 3 to 8 feet. The work renlaining to be done
to complete the project consists of dredging the channel, anchorages,
and turning basin. The total cost to June 30, 1937, was $61,738.73,
all for new work. The expenditure were $61,098.08.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $57,701.92, will be applied as follows:
Accounts payable June 30, 1937---------_---------_______-__-__        $640. 65
New work, complete by Oct. 27, 1937, under a contract in force,
  dredging of the entrance channel and anchorage areas to project
  dlmensions               _
               ------------------      -------                      57, 061. 27
      Total___------------------------                              57,701. 92
164                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   This work will complete the channel and anchorage areas authorized
in 1935. Maintenance dredging will not be required during the next
2 years. Therefore, no funds can be profitably expended during the
fiscal year ending June 30, 1939.
                                                   Cost and financial summary
Cost of new work to June 30, 19371111111111111111111111111 $61,738. 73
Cost of maintenance to June 30, 1937_
     Total cost of permanent work to June 30, 1937_____________                                                                  61, 738. 73
Minus accounts payable June 30, 1937----------------------------                                                                     640. 65

     Net total expenditures __________..._____________                                                                           61, 098. 08
Unexpended balance June 30, 1937_________ __-__   ___________                                                                    57, 701. 92
            Total amount appropriated to June 30, 1937----------------118,                                                              800. 00

            Fiscal year ending June 30                                  1933                 1934           1935        1936            1987


Cost of new work......-----------------------------------...........                       --------------                ...------------$1,938. 73
Cost of maintenance----__             ..--------
                                        ...                              -              -----------
                                                                                     --------                                       --
Total expended-----............--------....---------                   ------------------------.........          ....  ..
                                                                                                               ------------      ----   1,
                                                                                                                                        1,298.08

Allotted              -----------------------------------                             -----------------------          $59,000..........


Balance unexpended July 1, 19366 -------------                                                                                 $59, 000. 00
Gross amount expended___________----____________                                                                                 1, 298. 08

     Balance unexpended June 30, 1937__                                                                                          57, 701. 92
Amount covered by uncompleted contracts                                                -----------------------                   57, 601. 92

            Balance available June 30, 1937-                                        _____________________                               100. 00

                    15. LONG ISLAND INTRACOASTAL WATERWAY, N. Y.

   Location.-This waterway extends from East Rockaway Inlet, on
the south side of Long Island, to Great Peconic Bay at the eastern
end of Long Island. The section included under this project extends
from Great South Bay opposite Patchogue to the south end of
Shinnecock Canal. (See U. S. Coast and Geodetic Survey Chart
No. 578.)
   Existing project.-This provides for a channel 100 feet wide and
6 feet deep at mean low water, from the Federally improved channel
in Great South Bay opposite Patchogue to the south end of Shinne-
cock Canal. The mean tidal range varies from 0.3 foot in Shinne-
cock Bay to 0.9 foot in Moriches Bay, the rise and fall depending
largely upon meteorological conditions. Irregular fluctuations due
to wind or other causes are not of sufficient extent to affect naviga-
tion. The length of the section included in this project is 34 miles.
   The estimated cost for new work, made in 1937, is $286,000. The
approved estimated cost of annual maintenance made in 1937 is
$15,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937. (H. Doc. No. 181, 75th Cong., 1st sess.) The latest
published map is in the project document.
      RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                  165
   Local cooperation.-The River and Harbor Act of August 26, 1937,
required that local interests furnish, free of cost to the United States,
necessary rights-of-way and suitable spoil-disposal areas for new
work and for subsequent maintenance as required, and release the
United States from all claims for damages incidental to the work of
improvement. These provisions have not yet been complied with.
   Terminal facilities.-There are 17 boat repair and storage yards
within the area immediately adjacent to the Federal improvement.
There is ample room for expansion and development when future
commerce warrants.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under
the existing project, and there has been no cost or expenditure.
When examined in September 1936, the controlling mean low water
depth in the project channel from Great South Bay to Shinnecock
Canal varied from 0.6 to 6 feet. The natural, tortuous channel
through this section had a controlling depth of 4 feet for a width
of 60 feet.
   Proposedoperations.-There are no funds available for this project
and no work is contemplated during fiscal year 1938. It is expected
that the conditions of local cooperation will be complied with during
the next 2 years. Therefore, the sum of $286,000 can be profitably
expended during the fiscal year ending June 30, 1939, in dredging
under contract the project channel to dimensions authorized in 1937.
                         Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937__
Net total expenditures-----------      -
Total amount appropriated to June 30, 1937__
                                              ----------------

Amount (estimated) required to be appropriated for completion of ex-
                                                                     -
                                                                     --------


  isting project_----                     --------            ---    $286, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work_______     _____-------------------           286, 000

                        16. GREAT SOUTH BAY, N. Y.

   Location.-This is a lagoon inside the south shore of Long Island,
N. Y., about 26 miles long and 2 to 6 miles wide. The principal
entrance, through Fire Island Inlet, is about 38 miles east of the
entrance to New York Harbor and about 60 miles east of New York
City. (See U. S. Coast and Geodetic Survey Chart No. 578.)
   Previous projects.-Adopted by the River and Harbor Act of
September 19, 1890. The cost and expenditures were $40,000. The
records do not show how much of this was for maintenance. For
further details of previous projects see page 1773, Annual Report
for 1915.
   Existing project.-This provides for dredging a channel 200 feet
wide and 10 feet deep at mean low water from Fire Island Inlet to
the central basin in Great South Bay, and a channel 8 feet deep and
100 feet wide from the central basin in the bay to the head of naviga-
tion in Patchogue River. The length of section included in the proj-
ect is about 17 miles. Mean tidal range in the bay, 0.7 foot; mean
166      REPORT' OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

range of spring tides, 0.8 foot; extreme range due to wind and bar-
ometric pressure, 2.5 feet.
   The estimate of cost for new work, made in 1900, is $66,000,
exclusive of amount expended under previous project. The latest
 (1900) approved estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
June 13, 1902 (H. Doc. No. 103, 56th Cong., 2d sess.). For latest
published map see Annual Report for 1916, page 2018.
   Terminal facilities.-Water terminals, 7 in number, with available
wharfage of 4,100 feet, are scattered along the shore of Patchogue
River between its mouth and the head of the projected improvement,
1 on the east bank and 6 on the west bank. Three, with available
wharfage of 700 feet, are publicly owned. Four, with available
wharfage of 3,400 feet, are privately owned. All are open to the
public. One, with available wharfage of 2,000 feet, has rail con-
nection. These facilities are considered adequate for the water-borne
commerce.
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 8 feet from the 8-foot contour of Great South
Bay to the head of navigation in Patchogue River, work was com-
menced June 21, 1937, and was in progress at the end of the fiscal
year. During this period the contractor was engaged in the construc-
tion of dikes and other incidental work preliminary to actual dredg-
ing under the contract. The cost of surveys and contingencies pre-
liminary to contract dredging was $1,968.49, for maintenance. The
expenditures were $1,470.12.
   Condition at end of fiscal year.-The existing project is 90 percent
completed. The channel in Patchogue River was completed in 1904.
Of the dredging through three bars, necessary to provide the pro-
jected channel, only the easterly one, bar C, was dredged. The west
jetty, 1,700 feet long, completed under the previous project in 1897
and repaired in 1914, and the east jetty, formed of a sand spit 1,000
feet long, with a riprap extension 330 feet long, completed in 1917,
are in good condition. When examined in May 1937 the controlling
mean low-water depth was about 6 feet through a channel 50 to 100
feet wide in Patchogue River. The work remaining to be done under
the existing project consists of the dredging of a channel through
bars A and B. No further work of improvement appears necessary
at this time. The total cost to June 30, 1937, was $150,915.03-$59,-
820.82 for new work and $91,094.21 for maintenance. The expendi-
tures were $150,561.57.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $51,802.40, will be applied as follows:
Accounts payable June 30, 1937------------------ --------------          $353. 46
Maintenance: Complete by Dec. 8, 1937, under a contract in force, the
  restoration of the channel to project dimensions from deep water in
  Great South Bay to the head of the improvement in Patchogue
  River       ------------------------------------------          --- 51, 448. 94

      Total ----    -----------------------------         ---------- 51, 802. 40
  It is believed that further maintenance dredging will not be neces-
sary during the next 2 years. Therefore, no funds can be profitably
expended during the fiscal year ending June 30, 1939.
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                       167

                                      Cost and financial summary

Cost of new work to June 30, 1937______--------------------------                                      $99, 820. 82
Cost of maintenance to June 30, 1937___--                                                                   094. 21
                                                                                                        9------------------------1,
      Total cost of permanent work to June 30, 1937______________ 190, 915. 03
Minus accounts payable June 30, 1937-------------- --------------      353. 46
      Net total expenditures_--_---- -                       1.90, 561. 57
Unexpended balance June 30, 1937----------------------------51, 802. 40

          Total amount appropriated to June 30, 1937_------                                    ___--242, 363. 97

         Fiscal year ending June 30                  1933           1934           1935         1936           1937

Cost of new work....-------- ------------      -----------------------------------------
Cost of maintenance....               ------------ ------ ------
                         ----------------....                                    $557. 18        $25. 39      $1,968.49
                   .
Total expended-,......                __. --.-
                                            __ ,,----------___
                                                _ --       _529.                          69     197. 79       1, 470. 12
Allotted.------------------------------             -$36. 03-              ...   15, 000.00 ----------        39, 000 00


Balance unexpended July 1, 1936------------------------------- $14, 272.52
Amount allotted from War Department Appropriation Act approved
May 15, 1936     -------------------------------------------   39, 000.00

      Amount to be accounted for------------                                                               53, 272. 52
Gross amount expended __-----------...--     -                                                  -.          1,470. 12

     Balance unexpended June 30, 1937_---------                                                            51, 802. 40
Amount covered by uncompleted contracts_---- -- __------------                                             51, 522. 38

         Balance available June 30, 1937_
                                      ------                         __-----------------280.                          02

Amount (estimated) required to be appropriated for completion of
   existing     project 1--__ _                    _-----------__                                           6, 100. 00
  1 Exclusive of available funds.

                                   17. FIRE ISLAND INLET, N. Y.

   Location.-Fire Island Inlet is situated on the south shore of Long
Island, about 50 miles by water south and east of the Battery, New
York City. It is the main entrance into Great South Bay from the
Atlantic Ocean. (See U. S. Coast and Geodetic Survey Chart No.
578.)
   Existing project.--This provides for the construction of a jetty ex-
tending generally southwest and south for a length of 5,000 feet from
high ground on Democrat Point at the west end of Fire Island. Mean
tidal range, 3.6 feet; mean range of spring tides, 4.3 feet. Irregular
fluctuation due to wind and other causes do not materially affect
navigation.
   The estimate of cost for new work, made in 1937, is $759,000, includ-
ing $100,000 to be contributed by local interests. The approved esti-
mated cost of annual maintenance, made in 1937, is $25,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (Rivers and Harbors Committee Doc. No. 33, 75th
Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests shall furnish, free of cost to the United
168          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

States, necessary rights-of-way and easements, release the United
States from all claims for damages incidental to the improvement,
and contribute $100,000 toward its initial cost. These conditions have
not been complied with.
   Terminal facilities.-No terminals are within the area immediately
adjacent to the Federal improvement. There are four wharves with
available dockage of 2,000 feet and 1,200 feet of bulkhead at Patchogue,
of which the latter is open to the public on equal terms. At West
Sayville, 2 mooring basins have an available wharfage of 2,000 feet.
In addition, towns and villages have provided 3,500 linear feet of
bulkhead for public use for mooring purposes. The terminals are
ample for present and probable future needs. There is room for
expansion should future commerce warrant.
   Operation and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing project and there has been no cost or expenditure. The con-
trolling mean low water depth in the entrance to Fire Island Inlet
was 8 feet when examined in April-May 1937.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year ending June 30, 1938.
   It is expected that conditions of local cooperation will not be com-
plied with during the next 2 years. Therefore, no funds can be
profitably expended during the fiscal year ending June 30. 1939.
                                   Cost and financial summary

Cost of new work to June 30, 1937_    ________________________
Cost of maintenance to June 30, 1937_

      Net total expenditures .  -...... __ .          . ...
                                                . _____                              ...
                                                                                 _____     __
Total amount appropriated to June 30, 1937___________

Amount (estimated) required to be appropriated for completion
of existing project 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - $659, 000. 00
  1In   addition, $100,000 to be contributed by local interests.

                      18. EAST ROCKAWAY (DEBS) INLET, N. Y.

   Location.-On the south shore of Long Island between the main
body of the island and the western end of Long Beach. It is 10
miles east of Rockaway Inlet and about 27 miles by water from the
Battery, New York City. (See U. S. Coast and Geodetic Survey
Charts Nos. 579 and 1215.)
  Existing project.--Thisprovides for a channel 12 feet deep at mean
low water and 250 feet wide from the 12-foot contour in the Atlantic
Ocean to the 12-foot contour in Long Beach Channel, protected by
jetties. Mean tidal range, 3.9 feet; mean range of spring tides, 4.7
feet; irregular fluctuations due to wind and barometric pressure vary
from about 31/2 feet below mean low water up ,to about 31/2 feet above
mean high water.
   The estimate of cost for new work made in 1929 is $710,000 (of
which $100,000 was contributed by local interests). The latest (1929)
approved estimate for annual cost of maintenance is $20,000.
    RIVERS AND HARBORS--FIRS         NEW YORK, N. Y., DI.ST 1RCT   1169

   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 19, 71st Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that local interests shall contribute $100,000 ,to the cost of
the work; give assurances satisfactory to the Secretary of War and
the Chief of Engineers that they will provide and maintain at their
own expense interior channels suitable for navigation, not less than 12
feet deep, from East Rockaway Inlet to the Hempstead-Oyster Bay
line, a distance of about 15 miles, to Hewlett Harbor and to Freeport
Harbor; furnish, without expense to the United States, necessary
land, easements, and rights-of-way for construction and maintenance
of the jetties, and agree to hold and save the United States free of
claims for damages to public and private property resulting from
the improvement.
   Local interests have furnished the necessary easement, right-of-
way for construction, and release of claims for damages necessary
for the construction of the east jetty, have excavated the required
channels, and have contributed $100,000.
   Terminal facilities.-No terminals are within the area immediately
adjacent to the Federal improvement. The water front on the north
side of Long Beach has been bulkheaded. A town wharf with avail-
able dockage of about 400 feet exists at Woodmere. There is also a
town wharf at East Rockaway. It is expected that additional dock-
age will become available when needed.
   Operations and results during fiscal year.-The cost and expendi-
tures for a survey preliminary to dredging were $881.17, for main-
tenance.
   Condition at end of fl cal year.-The existing project is about 85
percent completed. The east jetty, 4,250 feet long, was completed in
1934. The project channel was completed in 1935. When examined
in March 1937, the controlling mean low-water depth through the
channel was 8 feet except for a shoal about 50 feet wide and 150
feet long having a depth of 7 feet along the west channel line near
its outer end. The work remaining to be done under the existing
project consists of building a west jetty, if necessary, to protect the
channel.
   The total cost and expenditures to June 30, 1937, were $519,929.12-
$503,968.68 for new work including $82,600 Public Works funds, and
$15,960.44 for maintenance. In addition $100,000 contributed funds
were expended for new work.
   Proposed operations.-The balance unexpended, at the end of the
year, together with an allotment of $69,000 to be made during the
fiscal year 1938, after receipt of bids, a total of $69,039.56 will be
applied to completion of maintenance dredging by December 15,
1937, under a contract to be entered into to restore the channel to
project dimensions from deep water in Atlantic Ocean to deep water
in Long Beach Channel.
   It is believed that neither further maintenance dredging nor re-
pairs to the jetty will be necessary during the next 2 years. There-
fore, no funds can be profitably expended during the fiscal year
ending June 30, 1939.
170             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                               Cost and financial summary
Cost of new work to June 30, 1937_----------------------             12 $503, 968. 68
Cost of maintenance to June 30, 1937        --------------- ___--15,          960. 44

         Total cost of permanent work to June 30, 1937--                                  ___-__              519, 929. 12
     Net total expenditures---_________
                               ---       ____          _______12                                              519, 929. 12
Unexpended balance June 30, 1937 .--------
                                   __      -----------        ____                                              - 39. 56
         Total amount appropriated to June 30, 1937---------------                                        12 519, 968. 68

         Fiscal year ending June 30                      1933           1934           1935           1936              1937


Cost of new work_          __---------------------    $5, 713. 62 $407, 589. 03 $90, 666. 03------------
Cost of maintenance_...____.....                   ________ ------------------------
                                                                   ___                       $15, 079. 27                $881.17
Total expended-__.-____-_______---. --                  3, 778. 67   384, 794. 25   106, 794. 07   23, 680. 96            881. 17
Allotted----   -----------------------------          149, 823. 91   342, 586. 43     8, 958. 34   18, 600. 00 ..........---------


Balance unexpended July 1, 1936-----------------------------                                                        $920. 73
Gross amount expended ----------------------------     $926.25
Less reimbursements collected------------------          45. 08
                                                                                                                      881. 17

         Balance unexpended June 30, 1937---------------------                                                          39. 56

Amount (estimated) required to be appropriated for completion
of existing project 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -               106, 000.00
   1 Includes $82,600 expended under Public Works   funds.
   2 In addition, $100,000 was expended from contributed funds.
   8 Exclusive of available funds.

19. NEW YORK HARBOR: AMBROSE, MAIN SHIP, BAYSIDE AND GED-
   NEY CHANNELS, INCLUDING ANCHORAGE CHANNEL, . CRAVEN
   SHOAL, CHANNEL BETWEEN STATEN ISLAND AND HOFFMAN AND
   SWINBURNE ISLANDS, ANCHORAGE AREAS AND CHANNEL ALONG
   THE NEW JERSEY PIERHEAD LINE, UPPER BAY

   Location.-The works included under the above title are in the
lower and upper bays, New York Harbor. The lower bay is 330 miles
southwest by water of Boston Harbor, Mass., and 165 miles northeast
of the entrance to Delaware Bay, N. J., and Del.
   The upper bay extends southerly from the junction of Hudson and
East Rivers opposite the Battery, New York City, a distance of about
51/2 miles. The lower bay extends from the Narrows to the sea, a dis-
tance of about 9 miles. (See U. S. Coast and Geodetic Survey Charts
Nos. 369 and 541.)
   Existing project.-This provides for the Ambrose Channel 45 feet
deep and 2,000 feet wide, extending from the sea to deep water in
the lower bay, length about 7.5 miles; for the Anchorage Channel,
an extension of Ambrose Channel, with the same depth and width,
in the upper bay, opposite the anchorage grounds, length about 5
miles; for Bayside-Gedney Channel 35 feet deep and 800 feet wide,
extending from the sea to Raritan Bay, length about 61/4 miles; for
the Main Ship Channel, 30 feet deep and 1,000 feet wide, extending
from Raritan Bay to deep water in the lower bay, length about 41/4
miles; for the removal of Craven Shoal to a depth of 30 feet; for a
channel 16 feet deep, 200 feet wide, and about 12,500 feet long, extend-
ing from bell buoy 23 to Hoffman and Swinburne Islands; for dredg-
ing an irregularly triangular-shaped anchorage area in the southerly
    RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT             171

half of Red Hook Flats (approximately 442 acres in extent) to depths
of 40 and 30 feet at mean low water; an anchorage in the vicinity of
Liberty, or Bedloes, Island (about 160 acres in extent) to 20 feet at
mean low water, and in dredging a channel along the New Jersey pier-
head line connecting Kill Van Kull with deep water in Anchorage
Channels, south of the Liberty Island anchorage to 20 feet at mean
low water for a width of 500 feet and a length of about 3 miles. The
project depths refer to mean low water. Mean tidal range, 4.7 feet;
mean range of spring tides, 5.6 feet; irregular fluctuations due to wind
and barometric pressure vary from 4 feet below mean low water up
to 4 feet above mean high water.
   The estimate of cost for new work, revised in 1937, is $13,300,000.
The latest (1937) approved estimate for annual cost of maintenance
is $315,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for the Main Ship-
Bayside-Gedney Channel, and the dimensions of this channel were
fixed by the Secretary of War, December 27, 1886, under authority
of the act of August 5, 1886 (A. R. 1887, p. 62, and 1888, p. 63) ; the
act of March 3, 1899, provided for the Ambrose Channel with depth
of 40 feet (H. Doc. No. 159, 55th Cong., 3d sess.) ; the act of June 25,
1910, provided for the maintenance of the entrance channels under
one head; the act of August 8, 1917, provided for extending the Am-
brose Channel into the upper bay opposite the anchorage grounds
 (H. Doc. No. 518, 63d Cong., 2d sess.), for the removal of Craven
Shoal (H. Doc. No. 557, 64th Cong., 1st sess.), and for the channel
to the Quarantine Islands (H. Doc. No. 625, 64th Cong., 1st sess.);
the act of July 3, 1930, provided for changing the position of the
southerly section of Anchorage Channel to give a fairway 2,000 feet
wide and 40 feet deep (River and Harbor Committee Doc. No. 18,
71st Cong., 2d sess.) ; the act of August 30, 1935, provided for dredg-
ing the south end of Red Hook Flats, the Liberty Island Anchorage,
and dredging a channel along the New Jersey pierhead line from
Kill Van Kull to this anchorage (H. Doc. No. 183, 73d Cong., 2d
sess.) and for deepening Bayside-Gedney Channel (New York and
New Jersey channels) to 35 feet for a width of 800 feet (H. Doc.
No. 133, 74th Cong., 1st sess.), and the act of August 26, 1937, pro-
vided for the deepening of Ambrose and Anchorage Channels to 45
feet for a width of 2,000 feet (Senate Committee Print, 75th Cong.,
1st sess.).
   For latest published map see Senate Committee Print, Seventy-
fifth Congress, first session.
   Terminal facilities.-In the harbor (Lower Bay, the Narrows, and
the Upper Bay) there are 35 piers, 4 ferry terminals, 4 car-float
 (railroad) terminal bridges, and various bulkheads and wharves.
The Lower Bay is largely undeveloped, having 11 piers and 12 bulk-
heads along the shores. At the Narrows, along the Staten Island
water front, and along the westerly shore of the Upper Bay from
Greenville, N. J., to Ellis Island, terminals are located as follows:
On Staten Island there are 23 piers in addition to the United States
quarantine station for the port of New York. The remaining fea-
tures are one shipyard and two ferry terminals. Along the westerly
shore of the Upper Bay (Greenville, N. J., to Ellis Island) there are
four large railroad freight terminals. One terminal is equipped with
172     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

facilities for handling ocean-going vessels. The terminals in But-
termilk Channel, Bay Ridge, and Red Hook Channels, and Gowanus
Creek (see separate reports under respective titles) are reached
through New York Harbor.
   By compact dated April 30, 1921, the States of New York and
New Jersey established the Port of New York District, embracing
the territory roughly 25 miles in radius around the Statue of Liberty,
and created the Port of New York Authority. (For latest full
description of terminal facilities see Port Series No. 20, Corps of
Engineers.)
   Operationsand results during fiscal year.-The cost of surveys and
contingencies, preliminary to dredging in the channel along the New
Jersey pierhead line, for new work, was $1,609.47.
   The cost of surveys to determine channel conditions for mainte-
nance was $7,480.13-$3,588.08 for Anchorage Channel, $2,528.55 for
Ambrose Channel, and $1,363.50 for.Main Ship, Bayside, and Gedney
Channels.
   The total cost was $9,089.60-$1,609.47 for new work and $7,480.13
for maintenance. The expenditures were $3,943.56.
   Condition at end of fiscal year.-The existing project is about 56
percent completed. Main Ship-Bayside-Gedney Channel was com-
pleted in 1891. The cost of new work amounted to $1,579,985.65,
including $116,530 applied to removing wrecks and a sunken rock
authorized by acts of July 25, 1868 and January 8, 1873.
   Ambrose Channel was completed to a depth of 40 feet in 1914 at a
saving of $1,497,493 under the estimated cost.
   Anchorage Channel relocated to the eastward, authorized by the
River and Harbor Act of July 3, 1930, was completed to a depth of
40 feet in 1932.
   The channel between Staten Island and Hoffman and Swinburne
Islands was completed in 1920 up to within 300 feet of the southerly
limits of the project. The dredged channel meets all the needs of
navigation and no further work of improvement is contemplated
for the present.
   The controlling mean low-water depths of the channels included
in this project are as follows: Ambrose Channel, 45 feet for a width
varying from 500 to 2,000 feet (August-September 1936) ; Main Ship
Channel, 30 feet, 450 to 1,000 feet wide (September-October 1936);
Bayside-Gedney Channel, 30 feet, 500 to 800 feet wide (September-
October 1936); Anchorage Channel, 45 feet, 800 to 2,000 feet wide
 (September 1931, February-July 1936); Craven Shoal, 30 feet ex-
cept for a shoal 100 feet by 600 feet, with a least depth of 27 feet,
located along westerly channel line (July 1931); channel between
Staten Island and Hoffman and Swinburne Islands, 16 feet, 100 to
200 feet wide, from buoy 23 southerly for 1 mile, thence to Swin-
burne Island, 12 feet, 140 to 200 feet wide (July 1931); anchorage
area at south end of Red Hook Flats, 16 feet (1932) ; anchorage area
at the north half of the Jersey Flats, 10 feet (June 1936); channel
along the New Jersey pierhead line, 6 feet (May-July 1936).
   The work remaining to be done to complete the existing project
consists in dredging Bayside-Gedney Channel, 800 feet wide, 35 feet
deep; south end of Red Hook Flats, 40 feet and 30 feet, respectively;
Liberty Island Anchorage, 20 feet, and channel along the New Jer-
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT 173

sey pierhead line from Kill Van Kull to this anchorage, 500 feet
wide and 20 feet deep, as authorized in 1935, and the deepening of
Ambrose and Anchorage Channels to 45 feet for a width of 2,000
feet, as authorized in 1937.
   The total cost of the existing project to June 30, 1937, was
$9,705,076.70--$7,472,634.73 for new work and $2,232,441.97 for
maintenance. The total expenditures amounted to $9,710,424.12.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, together with an allotment of $680,000 made during
July 1937, a total of $1,225,055.33, will be applied as follows:
New work :
   Complete by Nov. 15, 1938, under a contract to
     be entered into, the dredging of a channel
     along the New Jersey pierhead line from
     Kill Van Kull to Anchorage Channel_------- $610, 055.33
   Operate 2 United States seagoing dredges
     for a total of 10/2 dredge-months (Jan. 1-
     June 30, 1938) to complete 85 percent of the
     work necessary to deepen Bayside and Ged-
     ney Channels to 35 feet------------------    530, 000. 00
                                                                     $1, 140, 055. 33
Maintenance :
   Operate 1 United States seagoing dredge for
     31/4 months (Feb. 15-May 21, 1938) in the re-
     moval of shoals in Main Ship Channel------        80, 000. 00
   Sounding and sweeping surveys during the
     fiscal year to determine the condition of
     channel ---------------------------------          5, 000.00
                                                                         85, 000. 00

        Total    -----------------------------------------           1,225, 055. 33
   The dredging for new work will complete the 20-foot channel
along the New Jersey pierhead line authorized in 1935 and partially
complete the 35-foot Bayside and Gedney Channels. The dredging
for maintenance will partially restore Main Ship Channel to project
dimensions.
  The dredging for new work in Bayside and Gedney Channels
should be completed. The deepening of the Liberty Island Anchor-
age authorized in 1935 and the deepening of Ambrose Channel, au-
thorized in 1937, should be commenced during the fiscal year 1939.
The entrance channels should be maintained. Therefore, the sum
of $2,080,000 can be profitably expended during the fiscal year end-
ing June 30, 1939, as follows:
New work:
   Operate 1 United States seagoing dredge for 1/2
     months to complete the deepening of Bayside and
     Gedney Channels ----------------------------          $80, 000
   Complete by Dec. 1, 1939, under a contract to be en-
     tered into, the dredging of the Liberty Island
     Anchorage      ------------------------------      1, 100, 000
   Operate 2 United States seagoing dredges for
     a total of about 141/2 dredge-months during the
     fiscal year in deepening Ambrose Channel-------- 725, 000
                                                                        $1, 905, 000
    Maintenance: Operate 1 United States seagoing dredge for a
     total of about 7 months during the fiscal year to restore proj-
     ect dimensions in the entrance channels--_-------                      175, 000
        Total_--.
                --------------------         ------     ------           2, 080, 000
174           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                    Cost and financial summary

Cost of new work to June 30, 1937 _ _______________     ____ $7, 472, 634. 73
Cost of maintenance to June 30, 1937_______ _____--___-        2, 232, 441. 97
      Total cost of permanent work to June 30, 1937______----9, 705, 076.70
Undistributed costs June 30, 1937------------- -      _______       5, 347.42
      Net total cost to June 30, 1937_---_____ -____ ___- __ 9, 710, 424. 12

Net total expenditures -_____________________-                9, 710, 424. 12
Unexpended balance June 30, 1937-------_________-_____    ___    545, 055. 33
     Total amount appropriated to June 30, 1937_____________ 10,255,479. 45

      Fiscal year ending June 30            1933                1934                    1935              1936         1937


Cost of new work------.......---..      - $2, 826. 74 --------------------------                       $4, 573. 25    $1, 609.47
Cost of maintenance----------------       57, 733. 91         $71, 165. 58              $3, 085. 55    15, 420. 22     7, 480. 13
      Total cost---------------------    60, 560. 65           71, 165. 58               3, 085. 55     19, 993. 47    9, 089. 60

Total expended-....-....---------         6, 531. 95       -177, 303. 73           -1,540, 544. 04    -33,153.85       3, 943. 56

Allotted_-..--------------- --------     58, 553. 35           71, 073. 24         -1,876,390. 74     934, 800. 00 -681, 000. 00


Balance unexpended July 1, 1936-----------------------------         $1, 229, 998. 89
Deductions on account of revocation of allotment----                     681, 000. 00
      Net amount to be accounted for-                                     48, 998.89
                                                                         5______________
Gross amount expended -----
                          _---------___         ___-    $12, 992. 58
Less reimbursements collected -------____-                9, 049. 02    _____-
                                                                           3, 943. 56
      Balance unexpended June 30, 1937_______________________            545, 055. 33
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937________________________ -______                 680, 000. 00
       Balance available for fiscal year 1938__________________ 1, 225, 055.33
Amount (estimated) required to be appropriated for completion
  of existing project -----------------      -------------------      4, 688, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
    For new work 1-----------------------------------                                                         1, 905, 000. 00
    For maintenance 1----------        __---________                --
                                                                   ____-_                                        175, 000. 00
      Total --------------           ---- ------------------------                                            2, 080, 000. 00
1 Exclusive of available funds.


                            20. CONEY ISLAND CHANNEL, N. Y.

   Location.-This channel is situated in New York Harbor, Lower
Bay, about 9 miles south of the Battery, New York City. The
channel is shown on United States Coast and Geodetic Survey Chart
No. 369, but it is not named.
   Existing project.-This provides for a channel 600 feet wide and
20 feet deep at mean low water, extending from deep water south-
west of Nortons Point to deep water off Rockaway Inlet, a total length
of about 11/3 miles. Mean tidal range, 4.7 feet; mean range of spring
tides, 5.7 feet; irregular fluctuations due to wind and barometric pres-
sure vary from 4 feet below mean low water up to 4 feet above mean
high water.
   The estimate of cost for new work, made in 1906, is $168,300. The
latest (1928) approved estimate for annual cost of maintenance is
$12,000.
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                               175

  The existing project was adopted by the River and Harbor Act of
March 2, 1907 (H. Doc. No. 442, 59th Cong., 2d sess.). The latest
published map is in the project document.
  Terminal facilities.-There is a privately owned pier built out
from the Coney Island shore for summer passenger travel; it does
not extend to the channel. It is sufficient for this use. Commer-
cially the channel is part of the water route between New York Har-
bor and Jamaica Bay and points east along the southern shore of
Long Island. (For further details see Port Series No. 20, Corps of
Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project is about 66 percent
completed. The channel was dredged in 1913 to a depth of 20 feet
and width of 400 to 600 feet. When examined in October, 1936,
project depth existed throughout the channel except for a shoal 200
feet wide and 1,200 feet long with least depth of 14 feet along the
westerly end of the northerly channel line. The total costs and ex-
penditures to June 30, 1937, were $307,844.87; $111,371.21 for new
work and $196,473.66 for maintenance.
  Proposed operations.-There are no funds available for this proj-
ect, and no work is contemplated during the fiscal year 1938.
   Shoaling has occurred in the channel at various points. The sum
of $25,000 can, therefore, be profitably expended to operate one United
States seagoing dredge about 1 month (July 1938) to restore channel
to project dimensions.
                                   Cost and financial summary
Cost of new work to June 30, 1937 ----------------------------                                $111, 371. 21
Cost of maintenance to June 30, 1937-----                                                            473. 66
                                                                                               1-----------------------96,
       Total cost of permanent work to June 30, 1937 -------------                             307, 844. 87
Net total expenditures                                                                         307, 844. 87
Total amount appropriated to June 30, 1937-_                                                   307, 844. 87

            Fiscal year ending June 30           1933          1934             1935   1936           1937


Cost of new work- . ...                     ---.----                  _--....                         .......
Cost of maintenance-----------------$1, 855. 09             $21, 845. 21-------
Total expended.....---------------------       2, 069. 00    21,845. 21
Allotted        __ __     ________________-22, 000. 34       21,845. 21 .

Amount (estimated) required to be appropriated for completion of
existing project__-------------------------------                        $57, 000.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance                          _--------------------_ 25, 000. 00
                               21. CONEY ISLAND CREEK, N. Y.
   Location.-This creek is a narrow tidal inlet which empties into
Gravesend Bay about 10 miles south of the Battery, New York City.
 (See U. S. Coast and Geodetic Survey Chart No. 369.)
   Existing project.-This provides for a channel 12 feet deep at
mean low water and widths varying between 70 and 150 feet, ex-
tending from Gravesend Bay to Shell Road. Mean tidal range, 4.7
feet; mean range of spring tides, 5.6 feet; irregular fluctuations due
to wind and barometric pressure vary from 4 feet below mean low
water up to 4 feet above mean high water.
           20196-37-pt. 1--12
176       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Estimated cost for new work made in 1933 is $71,000; the latest
 (1933) approved estimated cost of annual maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935. (Rivers and Harbors Committee Doc. No. 12, 73d
Cong., 1st sess.) The latest published map is printed in the project
document.
   Local cooperation.-The River and Harbor Act of August 30, 1935,
provided that no work shall be done above any bridge which affords
inadequate clearances for navigation, that all dredging necessary
to afford a suitable passage 12 feet deep through the bridge has been
done without cost to the United States, and that available areas for
the deposit of dredged material shall be furnished by local interests.
   The clearances through the first three bridges were accepted by the
Chief of Engineers, under date of February 24, 1936, as being ade-
quate for the existing needs of navigation. The assurances for
dredging through the aforementioned bridges and a spoil-disposal
area were accepted as satisfactory by the Chief of Engineers on
April 15, 1937.
   Terminal facilities.-There is an aggregate total of 7,060 feet of
usable marginal wharves or bulkheads extending along Coney Island
Creek to within 1,000 feet of the head of navigation at Shell Road.
The existing facilities appear to be adequate for present commerce.
 (For further details see Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-The cost of survey pre-
liminary to dredging from the mouth to the West Eleventh Street
Bridge was $793.45 for new work. The expenditures were $2,139.68.
   Condition at end of iscal year.-No work has been done on this
project. The controlling depth at mean low water in the natural
channel, as shown by examinations made in October 1'932 and No-
vember and December 1936, was 10 feet for a channel 50 feet wide
from Gravesend Bay to a point opposite the Great Eastern Coal Co.
dock, thence 5 feet deep and 20 to 70 feet wide to the head of naviga-
tion at Shell Road.
   The total cost of the existing project to June 30, 1937, was $793.45,
all for new work. Total expenditures amounted to $2,139.68.
   Proposed operations.-The balance unexpended at the end of the
fiscal year will be applied as follows:
Accounts payable June 30, 1937     ------------------------            $99. 38
New work: Complete by Apr. 1, 1938, under a contract to be entered
into, the dredging of the channel to project dimensions from the
mouth to the West 11th St. Bridge--------------------------       52, 760. 94

      Total___-------------------------------------------                 52, 860. 32
  It is expected that the alteration of bridges to permit extension of
the project beyond West Eleventh Street will not be completed by
local interests during the next 2 years. Therefore no funds can be
profitably expended during the fiscal year ending June 30, 1939.
                         Cost and financial summary
Cost of new work to June 30, 1937---------------     --------------- $793. 45
Cost of maintenance to June 30, 1937-------    ------------------ ---------

      Total cost of permanent work to June 30, 1937---- -----------           793. 45
Undistributed costs June 30, 1937-------          ----------------         1, 445. 61
      Net total cost to June 30, 1937--------------------             -    2,239. 06
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                177
Minus accounts payable June 30, 1937------------------------                                          $99.38
      Net total expenditures--------------------------------                                        2,139. 68
Unexpended balance June 30, 1937 ---------------------------                                       52,860. 32

         Total amount appropriated to June 30, 1937---------------                                 55,000.00

         Fiscal year ending June 30              1933                 1934   1935     1936             1937

Cost of new work-----------------------------------                                                     $793.45
Cost of maintenance....---------------                                          ------------
Total expended ...      . . .       ..   .   .      ...........                                .       2, 139. 68
A llotted_   _   ... ............                                 .                   $55, 000.. ..........

Balance unexpended July 1, 1936                   -----------------$55, 000. 00
Gross amount expended_ -------------------------------------------   2,139. 68

      Balance unexpended June 30, 1937-----------------------52, 860. 32
Outstanding liabilities June 30, 1937---------------------------- 99;.38
         Balance available June 30, 1937-...                                                       52, 760. 94
Amount (estimated) required to be appropriated for completion of
   existing project 1------------------                                                            16, 000. 00
   1Exclusive of available funds.

                 22. BAY RIDGE AND RED HOOK CHANNELS, N. Y.

   Location.-These channels lie along the east shore of the Upper
Bay, New York Harbor, and, with Buttermilk Channel, form an
easterly channel along the Brooklyn water front from the Narrows
to East River. (See U. S. Coast and Geodetic Survey Charts Nos.
369 and 541.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1881, August 11, 1888, September 19, 1890, August 18, 1894, and
June 3, 1896. The total cost and expenditure amounted to $1,246,100.
For further details see page 1768 of Annual Report for 1915.
   Existing project.-This provides for a channel 1,200 feet wide and
40 feet deep at mean low water from the Narrows to Bay Ridge
Avenue, Brooklyn, thence 1,750 feet wide to the junction of Bay
Ridge and Red Hook Channels, thence 1,200 feet wide through Red
Hook Channel to the junction with Buttermilk Channel, and a chan-
nel of the same depth leading into Gowanus Bay extending from
the junction of Bay Ridge Channel with Red Hook Channel, nar-
rowing uniformly in width to about 500 feet off Twenty-eighth
Street, Brooklyn. Length of section included in the project, 41/
miles. Mean tidal range, 4.7 feet; mean range of spring tides, 5.6
feet; irregular fluctuations due to wind and barometric pressure vary
from 4 feet below mean low water up to 4 feet above mean high
water.
   The estimate of cost for new work, revised in 1930, is $4,609,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $150,000.
   The existing project was adopted in specific terms by River and
Harbor Act of March 3, 1899, no prior estimates for channels of
these dimensions having been published. A report upon a survey of
these channels showing the depths in 1897 was printed on page 1177
178     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of the Annual Report for 1897 and in House Document No. 337,
Fifty-fourth Congress, second session, with map. The River and
Harbor Act of March 2, 1907, authorized prosecution of the work
so as to obtain, first, a depth of 35 feet, subsequently increasing the
depth to 40 feet for the full width, in accordance with the project of
1899; this permitted a change in the order of the work without a
change in the project. The River and Harbor Act of July 3, 1930,
provided for the widening of Bay Ridge Channel to 1,750 feet
 (Rivers and Harbors Committee Doc. No. 44, 71st Cong., 2d sess., this
document containing the latest published map).
   Terminal facilities.-There are 76 piers and bulkheads used by
shipping interests along the water front of these channels. The
terminal facilities occupy practically all of the available wharf room
along the water front, and they are mostly of modern equipment.
The terminals have railroad connections. (For latest full descrip-
tion of terminal facilities see Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.--The U. S. seagoing
dredge W. L. Marshall was employed from December 21, 1936, to
February 13, 1937, and the U. S. seagoing dredge Raritan was em-
ployed from June 7 to 27 and 30, 1937, in dredging to a depth of 40
feet from 400 feet north of the foot of Bay Ridge Avenue to Pier 2,
Bush Terminal, Brooklyn, N. Y. There was removed a total of
123,259 cubic yards, bin measurement, of material at a total cost of
$41,784.37, for maintenance. The total expenditures were $39.945.28.
   Condition at end of fiscal year.-The existing project is about 85
percent completed. Bay Ridge Channel was completed to a depth
of 40 feet and a width of 1,200 feet in 1915. The work of widening
Bay Ridge Channel to 1,750 feet has been completed from Bay Ridge
Avenue to within 3,850 feet of its junction with Red Hook Channel.
Red Hook Channel has been completed to project dimensions for
2,250 feet northward of its junction with Bay Ridge Channel, thence
1,000 feet wide and 40 feet deep for 3,000 feet to the intersection with
Buttermilk Channel. The controlling mean low water depths as
shown by surveys made from April 1934 to June 1937 are as follows:
In Bay Ridge Channel, 40 feet for full project width from deep water
in the Narrows to Sixty-sixth Street, Brooklyn, thence 38 feet for
widths of 1,700 to 1,200 feet to Forty-eighth Street, thence 36 feet
for widths of 1,200 to 750 feet to Thirty-fifth Street, and thence 34
feet for a width of 800 to 400 feet to the head of improvement off
Twenty-eighth Street; in Red Hook Channel, 30 feet for a width of
500 feet from its junction with Bay Ridge Channel for a distance of
3,200 feet northward, thence 35 feet in a navigable channel 500 to
1,200 feet wide to the intersection with Buttermilk Channel. Shoals
along the channel lines and the westerly half of the south portion
of Red Hook Channel have limiting depths of 20 to 25 feet. The
work remaining to be done under the existing project is to complete
the widening of Bay Ridge Channel for a length of 3,850 feet south
of the junction with Red Hook Channel and to complete the dredg-
ing of Red Hook Channel for a length of 3,000 feet south of the
junction with Buttermilk Channel.
   The total cost to June 30, 1937, was $6,118,971.66-$3,881,767.86
regular funds and $64,559.68 Public Works funds, a total of $3,946,-
327.54 for new work and $2,172,644.12 for maintenance. The expendi-
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                               179
tures were $6,036,360.95 regular funds and $64,559.68 Public Works
funds, a total of $6,100,920.63.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, together with an allotment of $270,000 made in July
1937, a total of $307,739.56, will be applied as follows:
Accounts payable June 30, 1937--------------------------------    $18,051.03
New work: Operate 1 United States seagoing dredge about 43/4
  months during the period from December 1937 to May 1938 to par-
  tially complete the widening of Bay Ridge Channel authorized in
1930------------------------------ ------------------------ 120,000.00
Maintenance: Operate 1 United States seagoing dredge about 7
  months (October 1937-April 1938) to restore partially project
  dimensions in Bay Ridge and Red Hook Channels_________--        169, 688.53
           ---------------------------------------------------
           Total                                               307, 739. 56
  The widening of Bay Ridge and Red Hook Channels, authorized
in 1930, should be completed. Maintenance dredging of these chan-
nels has not been sufficient to maintain project dimensions. There-
fore the sum of $383,000 can be profitably expended during the fiscal
year ending June 30, 1939, as follows:
New work:
   Operate 1 United States seagoing dredge for about 21/2
     months during the fiscal year to complete the widening
     of Bay Ridge Channel authorized in 1930------------ $60,000
   Operate 1 United States seagoing dredge 1 month during
     the fiscal year to complete Red Hook Channel--         23, 000                                   ------
                                                                        $83, 000
Maintenance: Operate 2 United States seagoing dredges for a total of 12
months during the fiscal year to partially restore project dimensions
in Bay Ridge and Red Hook Channels_________-______________ 300,000

           Total------___                                          --------------------------------                                 383, 000

                                                Cost and financial summuary

Cost of new work to June 30, 1937---------------------------                                                         1$5, 192, 427. 54
Cost of maintenance to June 30, 1937----------__-------------                                                          2, 172, 644. 12

     Total cost of permanent work to June 30, 1937 ..........                                                            7, 365, 071. 66
Minus accounts payable June 30, 1937 ------------------------                                                                18, 051. 03

     Net total expenditures ---------------------------------                                                          17,   347, 020. 63
Unexpended balance June 30, 1937--------------------                                                                          37, 739. 56
           Total amount appropriated to June 30, 1937--___--                                              ___-         17, 384, 760.19

           Fiscal year ending June 30                               1933            1934           1935              1936       1     1937


Cost of new work---..              .--------                $212, 259.50         $65, 327.63
Cost of maintenance....-------------------                      70, 151. 56      110, 042. 84 $168, 493. 47    $322, 192. 20        $41, 784. 37
       Total cost..          ................----------------------282, 411.06   175, 370. 47   168, 493.47      322, 192. 20       41, 784.37
Total expended................----------------------          294, 539. 53       189, 757. 92   252, 555. 62     306, 737. 27       39, 945. 28
Allotted     .            ...........--------
                         --------------------                 299, 670. 34       461, 729. 48   122, 345. 42     388, 100. 00   -188, 000. 00


Balance unexpended July 1, 1936____________________ __-___                                                                  $265, 684.84
Deductions on account of revocation of allotment -------------                                                               188, 000. 00

            Net amount to be accounted for-------_-                                                                             77, 684. 84
   1 Includes $64,559.68 Public Works Funds.
180          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended ----                   __-                                                      $39, 945.28
      Balance unexpended June 30, 1937_____-__-__-______                                               37, 739. 56
Outstanding liabilities June 30, 1937--_____ ___-___-___                                               18, 051.03
     Balance available June 30, 1937__  ______ -       -_____                                          19, 688. 53
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937_--- _  _________-----------___                                            270, 000. 00
     Balance available for fiscal year 1938 -----
Amount (estimated) required to be appropriated for completion
                                                                          __    - -_______ 289, 688. 53
                      - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -
of existing project 2                                                                       543, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -     -
                                                                                                        3, 000.00
   For maintenance - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - -             300, 000. 00
        Total 2    -   - - -- -- - -- - -- - -- - -- - -- - -- - - -- - -- - - -- - -- -- - - -
                                                                                                      33, 000.0)
  2 Exclusive of available funds.


                        23. GOWANUS CREEK CHANNEL, N. Y.

   Location.-Gowanus Creek is a small tidal inlet extending north-
easterly about 11/2 miles from the north end of Bay Ridge Channel.
The channel is shown on U. S. Coast and Geodetic Survey Chart
No. 369, but is not named; entrance is shown on Chart No. 541.
   Previous projects.-Adopted by River and Harbor Acts of March 3,
1881 (under the title of "Gowanus Bay"), August 11, 1888, and Sep-
tember 19, 1890. The costs and expenditures are estimated at $75,000.
It is impracticable to estimate how much of this sum was applied to
maintenance. For further details see Annual Report 1915, page 1769.
   Existing project.-This provides for a channel 26 feet deep at
mean low water, extending eastward from the end of Bay Ridge and
Red Hook Channels at Twenty-eighth Street, for a distance of
about 2,900 feet to the foot of Percival Street, with width decreasing
from about 300 feet at its outer or western end to 200 feet at its
inner end, and thence to Hamilton Avenue Bridge, 18 feet deep at
mean low water and gradually reducing in width to 100 feet at
the bridge, all as limited by harbor lines. Mean tidal range, 4.7 feet;
mean range of spring tides, 5.6 feet; irregular fluctuations due to
wind and barometric pressure vary from 4 feet below mean low
water up to 4 feet above mean high water.
   The estimate of cost for new work made in 1896 was $70,000,
exclusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $6,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the 18-foot
channel, and the act of June 3, 1896, provided for the 26-foot channel
 (Annual Report 1896, p. 155). For latest published map of Gowanus
Creek see Annual Report for 1903, page 919.
   Terminal facilities.-There are 123 piers and bulkheads used by
shipping interests along the water front of this waterway and
Gowanus Canal, 4 of which are owned by the State of New York
as a barge-canal terminal, including a large grain elevator, 14 are
owned by the City of New York, 25 are owned and in use by 5 ship-
yards; the remainder are either privately or corporately owned and
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                         181

used for various commercial purposes. Two are open to the public;
none has rail connections. These terminals occupy practically the
whole of the water front. (For latest full description of terminal
facilities, see Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   ,Condition   at end of fiscal year.-The existing project was com-
pleted in 1904. When examined in June 1936, the controlling mean-
low water depth was 24 feet for a channel varying in width from 300
to 180 feet, from the entrance up to Percival Street, thence 16 feet
through a channel gradually reducing in width to about 100 feet to
Hamilton Avenue Bridge, the head of improvement. The total costs
and expenditures to June 30, 1937, were $110,947.58-$70,000 for new
work and $40,947.58 for maintenance.
  Proposed operations.--There are no funds available for this
project, and no work is contemplated during the fiscal year 1938.
  Shoaling has occurred throughout the project channel. The sum
of $40,000 can therefore, be profitably expended, under contract for
maintenance, during the fiscal year ending June 30, 1939, to restore
the channel to project dimensions.
                                         Cost and financial summary

Cost of new work to June 30, 1937-----------------------------                                            $145, 000. 00
Cost of maintenance to June 30, 1937--------------------------                                              40, 947. 58
      Total cost of permanent work to June 30, 1937-----------185, 947. 58
Net total expenditures _-                          _      _    185, 947. 58
Total amount appropriated to June 30, 1937                  _   85, 947. 58
                                                               1--------------_

         Fiscal year ending June 30                      1933        1934              1935        1936          1937


Cost of new work.................
Cost ofmaintenance ...............                                 ---
Total expended .---------------------                                       --------------------

Allotted--------------------
       .....................            ---.........   -$269. 50                                             .     .


Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance___________________________- $40, 000.00

                              24. BUTTERMILK                    CHANNEL, N. Y.

  Location.-This channel connects deep water in the Upper Bay,
New York Harbor, southwest of Governors Island, with deep water
in East River northeast of Governors Island, and with Bay Ridge
and Red Hook Channels forms an easterly channel along the Brook-
lyn water front from the Narrows to East River. It lies between
Governors Island and Brooklyn Borough, New York City. (See
U. S. Coast and Geodetic Survey Charts Nos. 541 and 745.)
  Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, July 13, 1892, and June 3, 1896. The total cost and ex-
penditures were $496,250. For further details see page 205, Annual
Report for 1932.
  Existing project.-This provides for a channel 1,000 feet wide,
40 feet deep at mean low water for the width of the existing 500-
182     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

foot channel and 35 feet deep for the remaining 500-foot width west
of the existing channel, with suitable widening at the junctions with
East River and Red Hook and Anchorage Channels. Length of sec-
tion included in the project, 21/4 miles. Mean tidal range, 4.5 feet;
mean range of spring tides, 5.5 feet; irregular fluctuations due to
wind and barometric pressure vary from 4 feet below mean low
water up to 4 feet above mean high water.
    The estimated cost for new work, revised in 1935, is $1,605,000,
exclusive of amounts expended on previous projects, the latest (1935)
approved estimated cost of annual maintenance is $20,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902 (H. Doc. No. 122, 56th Cong.,
2d sess.) provided for a channel 1,200 feet wide and not less than 30
feet deep at mean low water; the act of August 30, 1935 (Rivers and
Harbors Committee Doc. No. 55, 74th Cong., 1st sess.) modified this
by providing for a channel 1,000 feet wide with depths of 40 feet and
35 feet.
    Terminal facilities.-There are 37 terminals with a length of 36,253
feet of available dockage, comprising 24 open-pile piers, 4 crib and
concrete bulkheads, 3 open-pile wharves, 4 railroad float bridges, and
2 timber ferry racks. (For latest full description of terminal facili-
ties see Port Series No. 20, Corps of Engineers.)
    Operations and results during fiscal year.-The cost of a survey
made in June 1937 to determine the condition of the channel was
$2,883.90, for maintenance. The expenditures were $1,725.63,
    Condition at end of fiscal year.-The existing project is about 51
percent completed. The easterly 500-foot width of channel 40 feet
deep from the Anchorage Channel to East River was completed in
April 1935. When examined in February and April 1934, August
and September 1936, the controlling mean-low water depth was 40
feet through a channel 500 feet wide from deep water at southerly
entrance from Anchorage Channel to the junction of Buttermilk
Channel with East River, except for a 2,600-foot length of channel
between Anchorage and Red Hook Channels where the least depth
was 34 feet, and opposite the Hamilton Avenue ferry slip in the
pipe-line area where the depth was 38 feet. When examined in
June 1937 the westerly 500-foot width was not less than 20 feet deep
for the full length of the channel except along the westerly channel
line adjacent to Governors Island, where it was 16 feet deep and
less. The work remaining to be done to complete the project con-
sists in deepening to 35 feet the westerly 500-foot width of channel
from the Anchorage Channel to East River, and the widening at
the junction with East River, Red Hook, and Anchorage Channels.
    The cost and expenditures to June 30, 1937, Public Works funds,
were $122,051.24, for new work.
    The cost to June 30, 1937, regular funds, was $867,839.30--$698,-
067.03 for new work and $169,772.27 for maintenance. The expendi-
tures were $866,681.03.
    The total cost to June 30, 1937, all funds, was $989,890.54---$820,-
118.27 for new work, and $169,772.27 for maintenance. The total
expenditures amounted to $988,732.27.
           RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                            183
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, together with an allotment of $80,000 made in July 1937,
a total of $81,274.37, will be applied as follows:
Accounts payable June 30, 1937___--------------------------------- $1,158.27
Maintenance: Operate 1 United States seagoing dredge for 3 months
  (March-May 1938) in the partial removal of shoals near the junc-
  tion with Anchorage Channel-__--------------------- ------       80, 116. 10

     Total________________------------------------------___ ---------- 81,274.37
  The authorized widening west of the existing channel should be
commenced. Excessive shoaling in the existing channel has reduced
the effective dimensions of the channel. Maintenance dredging
should be continued. Therefore, the sum of $883,000 can be profitably
expended during the fiscal year ending June 30, 1939, as follows:
New work:
   Complete by August 1939, under a contract to be entered
    into, the authorized widening west of the existing
    channel from about opposite the junction with Red
    Hook Channel to the junction with East River ____ $533,000
   Operate 1 United States seagoing dredge for 10 months
    during the fiscal year to complete the authorized wid-
    ening west of the existing channel from the junction
    with Anchorage Channel to about opposite the junc-
    tion with Red Hook Channel_--      --------- ___ __    $250, 000
                                                                                                                                    $783, 000
Maintenance: Operate 1 United States seagoing dredge for 4
months during the fiscal year in the removal of shoals in
the existing channel                                                                                                                100, 000
             Total----------------------------------------------                                                                     883, 000

                                                     Cost and financial summary
Cost of new work to June 30, 1937__
                                  --------------------------                                                             $1, 316, 368.27
Cost of maintenance to June 30, 1937_-----------                                                     -------                 169, 772.27

      Total cost of permanent work to June 30, 1937---------                                                                 1, 486, 140. 54
Minus accounts payable June 30, 1937--------------------                                                                          1,158.27
     Net total expenditures--------------------------------                                                              11,484, 982. 27
Unexpended balance June 30', 1937---------------                                                                              1,274. 37
             Total amount appropriated to June 30. 1937-------------                                                     11.   486. 256. 64

            Fiscal year ending June 30                                     1933          1934           1935          1936             1937


Cost of new work              --------------------                 $129,885. 86 $485, 837. 52 $100,174. 59          $6, 889. 02--
Cost of maintenance --               -               -........
                                                          --....                  .       _--...                                  $2, 883.90
                                                                                                                          .-----------------------
Total expended----------....                   ------------.102, 274.88               475, 390. 76   149, 507. 67   7,110. 82          1,725.63
Allotted..........................----------------------..------    628, 282. 29      101,716. 85     17, 051.04     -910.98        -17,000.00


Balance unexpended July 1, 1936 ----------------------------                                                                   $20, 000. 00
Deductions on account of revocation of allotment --...                                                                          17, 000.00
             Net amount to be accounted for--------------------------                                                               3, 000. 00
Gross amount expended --                                             ---                        -         -                         1, 725. 63

             Balance unexpended June 30,1937                                                                                        1,274. 37
    1 Includes $122,051.24 Public Works funds.
184          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937--__                            _________        $1,158. 27

     Balance available June 30, 1937----------------------------    116.10
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------------------------------        80,000. 00

     Balance available for fiscal year 1938---------------------80, 116. 10
Amount (estimated) required to be appropriated for completion of
  existing      project       ---------------                                    _   783, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2- - - - - - - - - - - - - - -        - - --
                                                                                     783, 000. 00
      For   maintenance --                      ____--_----------                    100, 000. 00

        Total    ---------------------------------------                             883, 000. 00
2   Exclusive of available funds.

                                                 25. EAST RIVER, N. Y.

   Location.-This is a tidal strait about 16 miles long and 600 to
4,000 feet wide, connecting Hudson River and the Upper Bay at
the Battery, New York City, with Long Island Sound at Throgs
Neck, New York City, and separating Long Island from Manhattan
Island and the mainland. (See U. S. Coast and Geodetic Survey
Charts Nos. 223, 226, and 745.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, July 25, 1868, March 3, 1899, and June 25, 1910. Cost and
expenditures amounted to $6,225,357.45-$6,187,693.50 for new work
and $37,663.95 for maintenance. For further details see page 210,
Annual Report for 1932.
   Existing project.-This provides for channels of the following
dimensions (depths refer to mean low water) : From deep water in
the upper New York Bay to the Brooklyn Navy Yard, 40 feet deep
and 1,000 feet wide; from the Brooklyn Navy Yard to Throgs
Neck, 35 feet deep, with widths varying from about 550 feet to 1,000
feet, according to locality; east of Welfare (Blackwells) Island up
to English Place, Long Island City, 30 feet deep and varying in width
from 500 to 900 feet, with widening in the approach from the
main channel; between South Brother and Berrian Islands, 20 feet
deep and 300 feet wide, with widening in the approach from the
main channel; for the removal of Coenties Reef to a depth of 40 feet,
also the removal of the following rocks and reefs lying outside of the
limiting lines of the main channel to give access to wharves: Along
the Brooklyn shore, Brooklyn Bridge to Manhattan Bridge (Fulton
Ferry Reef), to a depth of 25 feet; Jay Street Reef, 25 feet; Corlears
Reef, 35 feet; Shell Reef, 25 feet; Horns Hook, 40 feet; Rhinelander
Reef, 26 feet; and reef off Oak Point, 30 feet; and for the construction
of a dike in Pot Cove in Hell Gate. The length of the section in-
cluded in the improvement is about 16 miles. The mean range of
tides varies according to locality from 4 feet at the Brooklyn Navy
Yard and 4.4 feet at the Battery to 5 feet at Hallets Point, 6.3 feet
at Port Morris, and 7.1 feet at the eastern entrance at Throgs Neck;
mean range of spring tides, 5.3, 6.1, 7.4, and 8.4 feet, respectively;
irregular fluctuations due to wind and barometric pressure vary ac-
cording to locality from 4 feet below mean low water at the Bat-
tery, 3.5 feet at the navy yard, and 4 feet below at Throgs Neck up to
about 4 feet above mean high water at the Battery and 4.5 feet above
    RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT            185
mean high water at Throgs Neck; extreme fluctuations do not seri-
ously affect navigation.
    The estimate of cost for new work, revised in 1933, exclusive of
amounts expended on previous projects, is $24,000,000. The latest
 (1921) approved estimate for annual cost of maintenance is $25,000.
   The existing project was authorized by the following river and
harbor acts: Public Resolution No. 67, Sixty-third Congress, third
session, March 3, 1915, provided for the removal of Coenties Reef
to a depth of 35 feet (H. Doc. No. 188, 63d Cong., 1st sess.), condi-
tioned upon local cooperation increasing the depth to 40 feet; act of
July 27, 1916, provided for a channel 1,000 feet wide and 35 feet deep
across Diamond Reef (H. Doc. No. 188, 63d Cong., 1st sess.), and
the acts of August 8, 1917, and July 18, 1918, provided for a depth
of 40 feet across Diamond Reef and through East River and Hell
Gate (H. Doc. No. 140, 65th Cong., 1st sess.), and for the remaining
items under the existing project (H. Doc. No. 188, 63d Cong., 1st
sess.); the River and Harbor Act of September 22, 1922, modified
the existing project by limiting the depth to be made in the through
channel between Brooklyn Navy Yard and Throgs Neck to 35 feet,
and provided for the removal of certain rocks and reefs and the
construction of a dike in Pot Cove (Rivers and Harbors Committee
Doc. No. 3, 67th Cong., 2d sess.). The latest published map is printed
in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Both shores of the East River from the Bat-
tery, Manhattan Borough, to Hunts Point, east of Hell Gate, a length
of about 12 miles, are occupied by 140 piers, 15 ferry slips, 23 car-
float bridges, and 25,000 feet of bulkheaded water front available for
dockage.
   In an endeavor to keep pace with the growing commerce of New
York Harbor, the city authorities are constantly improving the ter-
minals in the East River and elsewhere in the harbor. (For latest
full description of terminal facilities, see Port Series No. 20, Corps
of Engineers.)
   Operations and results during fscal year.-The U. S. derrick boat
E. R. 101 was employed from July 3 to 13, 1936, and the U. S. der-
rick boat Babcock was employed intermittently from August 11, 1936,
to June 20, 1937, in removing isolated shoals and large boulders from
the East River between the Battery and the Williamsburg Bridge. A
total of 1,044.5 cubic yards, place measurement, of rock was removed
at a cost of $68,133.88 for maintenance. The expenditures were
$69,249.56.
   Condition at end of fiscal year.-The existing project is about 99
percent completed.
   The controlling mean low-water depth from deep water in the
Upper Bay to the Brooklyn Navy Yard is 40 feet for full channel
width except for a small section opposite the Battery where the
width is limited to 400 feet and at Corlears Reef where it is lim-
ited to 900 feet. From the navy yard through the West Channel
at Welfare (Blackwells) Island and Hell Gate to Throgs Neck at
Long Island Sound, the controlling mean low-water depth is 35
feet for widths varying from 550 to 1,000 feet. In the section of
the East Channel at Welfare (Blackwells) Island included in the
existing project it is 28 feet front off Newtown Creek to English
186             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Place (43d Drive), Long Island City, and continuing through the
natural channel of navigable width to deep water off the north end
of Welfare (Blackwells) Island it is 24 feet. The controlling depth
in the channel between South Brother and Berrian Islands is 20
feet for a width of 300 feet.
   The work remaining to be done to complete the existing project
consists of the removal of a small area along the east side of the
35-foot channel between Grand Street and North Third Street,
Brooklyn. The construction of the dike at Pot Cove in Hell Gate
and a part of the widening near the pierhead line in Jay Street Reef
were omitted as being unnecessary.
   The cost and expenditures to June 30, 1937, Public Works funds,
were $1,743,265.42, for new work.
   The cost to June 30, 1937, regular funds, was $22,527,468.75-
$22,106,453.80 for new work and $421,014.95 for maintenance. The
expenditures amounted to $22,522,465.29.
   The total cost of the existing project to June 30, 1937, all funds,
was $24,270,734.17-$23,849,719.22 for new work and $421,014.95 for
maintenance. The total expenditures amounted to $24,265,730.71.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, together with an allotment of $25,000 made in July 1937,
a total of $40,975.82, will be applied as follows:
Accounts payable June 30, 1937                         _____________-------------                                       $5, 921. 38
Maintenance: Operate the U. S. derrick boat Babcock for about 4
months (August-November 1937) in the removal of isolated rock
                                           -------------------
shoals throughout the length of the project_                   35, 054. 44
           Total---------------------------------------------------                                                     40,975. 82
  Additional maintenance will be necessary during the next 2 years.
Therefore, the sum of $25,000 can be profitably expended during
the fiscal year ending June 30, 1939, in continuing the removal of
isolated shoals by the use of the U. S. derrick boat Babcock and
attendant plant.
                                          Cost and financial summary

Cost of new work to June 30, 1937_______________                                           ----               '$30, 037, 412. 72
Cost of maintenance to June 30, 1937____________                                                                    458, 678. 90

     Total cost of permanent work to June 30, 1937_                                                               30, 496, 091. 62
Undistributed costs June 30, 1937_    __   _____                                                                             917.92

          Net total cost to June 30, 1937________________                                                          30, 497, 009. 54
Minus accounts payable June 30, 1937_                                                                                    5, 921. 38
                                                                                                                         --

     Net total expenditures ______________________                                     ----------              130, 491, 088. 16
Unexpended balance June 30, 1937_________________                                                                       15, 975. 82

           Total amount appropriated to June 30, 1937                                             __
                                                                                                  ---             130, 507, 063.98

    Fiscal year ending June 30                1933               1934               1935                   1936             1937


Cost of new work----.........._  $754, 488. 70 $1, 063, 928. 25 $1, 142, 545. 30                        $113, 634. 17   -
Cost of maintenance__----.......   34, 425. 85       5, 850. 54               ------------                66, 009. 26       $68, 133.88
       Total cost.---------------           788, 914. 55    1,069,778. 79      1, 142, 545. 30           179, 643. 43       68, 133. 88
Total expended.....----------------         726, 440. 39    1, 151, 742. 77      255, 271. 28            279, 082. 87       69, 249. 56
Allotted- ..--.--.----...     -. .    -   1, 086, 308. 67   1, 585, 226. 18    -573, 752. 08              34, 876. 34       51, 000. 00


   1Includes        $1,743,265.42    Public Works funds.
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                             187
Balance unexpended July 1, 1936__ ___------    ------------                  $34, 225. 38
Amount allotted from War Department Appropria-
  tion Act approved Apr. 9, 1935__ ---      -___-     $8,472.90
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936_ --.---------      - 42, 527. 10
                                                                              51, 000. 00

      Amount to be accounted for__------------------                          85, 225.38
Gross amount expended______________--- -- -       $69, 449. 56
Less reimbursements collected_-------------------      200. 00
                                                                              69, 249. 56

      Balance unexpended June 30, 1937__                                      15, 975. 82
Outstanding liabilities June 30, 1937---------------------                     5, 921. 38

     Balance available June 30, 1937------------------                        10, 054. 44
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------                           25, 000. 00

      Balance available for fiscal year 1938             _----------------    35, 054. 44

Amount (estimated) required to be appropriated for completion
of existing project 2_                                                      150, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939; for maintenance 2_____                                        25, 000. 00
2Exclusive of available funds.
                     26. WALLABOUT CHANNEL, N. Y.

   Location.-This channel is a tidal branch of East River, N. Y.,
about 2.5 miles by water northeast of the Battery, New York City.
It is located on the east side of the river in the bight of a bend, be-
hind what was formerly an island known as Cob Dock. (See U. S.
Coast and Geodetic Survey Chart No. 745.)
   Existing project.-This provides for a channel 20 feet deep at
mean low water, 230 to 350 feet wide, and about 2,000 feet long.
Mean tidal range, 4 feet; mean range of spring tides, 4.8 feet; irregu-
lar fluctuations, due to wind and barometric pressure, vary from
about 3.5 feet below mean low water up to about 4 feet above mean
high water.
   The estimate of cost for new work, made in 1898, was $40,000.
The latest (1917) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1899 (H. Doc. No. 50, 55th Cong., 3d sess.). The latest
published map is in the project document.
   Terminal facilities.-The entire channel front is occupied by 13
piers, 19 bulkheads, and 1 railroad float bridge; the total available
dockage is 17,798 feet. There is no space left available for the con-
struction of additional terminals. (For latest full description of
terminal facilities see Port Series No. 20, Corps of Engineers.)
   Operations and results during fisca year.-None.
   Condition at end of fiscal year.-- he existing project was com-
pleted in 1900 at a saving of $21,826 under the estimated cost. The
controlling mean low-water depth, as shown by soundings taken in
June 1936, was 20 feet through a channel varying in width from 100
to 350 feet. The total, cost and expenditures to June 30, 1937, were
$36,897.85-$18,173.69 for new work and $18,724.16 for maintenance.
   Proposed operations.-There are no funds available for this
project, and no work is contemplated during the fiscal year 1938.
188           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Shoaling has occurred throughout the project channel. The sum
of $25,000 can, therefore, be profitably expended, under contract for
maintenance, during the fiscal year ending June 30, 1939, to restore
the channel to project dimensions.
                                    Cost and financial summary

Cost of new work to June 30, 1937____________________________                                                         $18, 173. 69
Cost of maintenance to June 30, 1937__________________,______                                                          18, 724. 16

      Total cost of permanent work to June 30, 1937_______________                                                        36, 897. 85
Net total expenditures -----                    ---------                                                                 36, 897. 85
            Total amount appropriated to June 30, 1937___________                                                 _       36, 897. 85

        Fiscal year ending June 30                   1933             1934             1935                 1936              1937


Cost of new work-........---------------.
Cost of maintenance--------------              -------          -----------.-----------.--------------------
Total expended              ---     -----..................----
                                             ---------..      --..........           .......       .....-......           .....-...
Allotted.           . ..
               .. --------------------------         -$2. 15      .          .   .             .            .         .          .


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance -__--      --               ____-_-_-__ $25, 000. 00

                                  27. NEWTOWN CREEK, N. Y.

   Location.-This creek is a tidal arm of East River, N. Y., about
41/  miles by water northeast of the Battery, New York City, and
forms a part of the boundary between the Boroughs of Brooklyn and
Queens, New York City. (See U. S. Coast and Geodetic Survey
Chart No. 745.)
   Previous projects.-Adopted by River and Harbor Acts of June 14,
1880, July 5, 1884, and June 3, 1896. The total cost and expenditures
were $569,129.97. The cost of new work and maintenance cannot be
separately stated with accuracy, the division in the early years be-
ing indeterminable; an approximate estimate is that $401,260.51 was
for new work and $167,869.46 was for maintenance. For further
details see page 1769 of Annual Report for 1915.
   Existing project.-This provides for a channel 23 feet deep and
130 feet wide from the East River to a point about 150 feet north
of Maspeth Avenue; for a turning basin in the vicinity of Mussel
Island and a triangular area lying on the north side of the entrance
to the creek of the same depth; for a channel 20 feet deep at mean
low water elsewhere in Newtown Creek, including Dutch Kills, Mas-
peth Creek, and English Kills, of the following widths: 150 feet
wide from Maspeth Avenue to Grand Street Bridge; thence 125 feet
wide to Metropolitan Avenue on the East Branch, including the
removal of Mussel Island; 100 feet wide for a distance of 2,000 feet
up Maspeth Creek; 75 to 100 feet wide for a distance of 2,800 feet up
Dutch Kills with a turning basin at the head; and 150 feet wide in
English Kills, or West Branch, to the Metropolitan Avenue Bridge,
including the easing of bends; and for a channel 12 feet deep and 100
feet wide in English Kills from the Metropolitan Avenue Bridge to
within 80 feet of the Montrose Avenue Bridge, suitably widened at
     RIVERS AND HARBORS-FIRST        NEW YORK, N. Y., DISTRICT     189

bends and materially widened by excavating upland at the second
bend above the Metropolitan Avenue Bridge. The total length of
channel included in the project is about 27,300 feet. Mean tidal
range, 4.2 feet; mean range of spring tides, 5 feet; irregular fluctua-
tions due to wind and barometric pressure vary from about 3.5 feet
below mean low water up to about 4 feet above mean high water.
   The estimate of cost for new work, revised in 1937, is $1,196,500,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $22,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 2, 1919 (H. Doc. No. 936, 64th Cong., 1st
sess.), provided for depth of 20 feet; the act of July 3, 1930 (Rivers
and Harbors Committee Doc. No. 42, 71st Cong., 2d sess.), provided
for the 23-foot channel; and the act of August 26, 1937 (Rivers and
Harbors Committee Doc. No. 4, 75th Cong., 1st sess.), provided for
the 12-foot channel in English Kills above the Metropolitan Avenue
Bridge. A modification of harbor lines in the vicinity of Mussel
Island was approved by the Secretary of War January 21, 1920, and
a concordant minor modification of the project without change in the
estimate of cost was approved by authority of the Secretary of War
March 22, 1920. The latest published maps are in the above project
documents.
   Local cooperation.-The River and Harbor Act of March 2, 1919,
requires that all land needed for right-of-way be furnished without
cost to the United States, and provides that no work shall be done
in Maspeth Creek, in the removal of Mussel Island, or in English
Kills until this has been done in each case and corresponding changes
made in existing harbor lines; also that no work shall be undertaken
under the existing project in Dutch Kills until the obstructive bridges
near its mouth have been suitably modified.
   The River and Harbor Act of August 26, 1937, requires that
local interests furnish, free of cost to the United States, necessary
easements or rights-of-way for the enlargement of the channel in
English Kills above Metropolitan Avenue and give assurances satis-
factory to the Secretary of War that they will remove obstructive
deposits resulting from the discharge of sewage into the waterway.
That act also requires that local interests furnish necessary lands or
rights-of-way for widening the second bend south of Metropolitan
Avenue.
   The lands needed in Maspeth Creek, Mussel Island, and the East
Branch have been ceded to the United States by the city of New York
by deed. The work of modifying the bridges near the mouth of Dutch
Kills was completed in 1923. No action has been taken by the city
authorities to comply with the requirements for dredging in English
Kills (West Branch).
   Terminal facilities.-The length of water front measured along both
sides of the projected improvement is 11.6 miles, of which 9.6 miles
are bulkheaded and about 13/4 miles of frontage, distributed over the
entire length of this waterway, is yet undeveloped. The total avail-
able dockage is 51,420 feet, which is considered adequate for present
needs. (For latest full description of terminal facilities see Port
Series No. 20, Corps of Engineers.)
190     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results duringq fiscal year.-Under a contract for
dredging to a depth of 16 feet in English Kills, from a point just
north of Maspeth Avenue to the Metropolitan Avenue Bridge, for
maintenance, work was commenced April 5, 1937, and completed May
5, 1937. There was removed during the fiscal year a total of 108,255
cubic yards of material, place measurement, at a cost and expenditure
of $41,599.39, for maintenance, under the previous project.
   Condition at end of fscal year.-The existing project is about 64
percent completed. The work of enlarging the main channel to 23
feet deep and 130 feet wide from the entrance to 150 feet north of
Maspeth Avenue, including the triangular area at the entrance, and a
turning basin at the former location of Mussel Island, is about 90
percent completed. Dutch Kills has been dredged to project depth
 (20 feet) for a width of 75 to 100 feet except at a few places near the
head of improvement where unstable bulkheads restricted dredging
operations. Maspeth Creek has been dredged to project dimensions
throughout. The controlling mean low-water depth in main channel
of Newtown Creek, according to surveys made from 1932 to July 1935,
was 22 feet from the entrance to 150 feet above Maspeth Avenue for
the following widths: From the entrance to Greenpoint Avenue, 130
feet; thence to Meeker Avenue, varying from 60 to 130 feet; thence to
150 feet north of Maspeth Avenue, 50 to 130 feet. In the turning basin
at the former location of Mussel Island the depth was 23 feet except
for a few scattered shoals having a depth of 22 feet. When examined
in May 1933, the controlling depth in Dutch Kills was about 16 feet
except at Hunters Avenue Bridge, where it was 13 feet. As shown by
an examination made in August 1932, the depth in Maspeth Creek was
19 feet. The controlling mean low-water depth in East Branch, ac-
cording to surveys made in October 1929, July 1933, and May 1937,
was 16 feet from 150 feet north of Maspeth Avenue to opposite the
entrance to English Kills; thence to Grand Street, 13 feet; and thence
to Metropolitan Avenue, 12 feet. When examined in March 1936 and
May 1937, the depth in English Kills (West Branch) to Metropolitan
Avenue was 16 feet, and thence to 80 feet north of Montrose Avenue
 (the head of the project) the depth was about 8 feet.
   The work remaining to be done consists of completing to project
dimensions the channel between Greenpoint and Meeker Avenues,
and from 800 feet north of Maspeth Avenue to Metropolitan Avenue,
in the East Branch, and to 80 feet north of Montrose Avenue, in
English Kills (West Branch).
   The total cost and expenditures of the existing project to June
30, 1937, were $919,115.20-$767,093.96 for new work and $152,021.24
for maintenance.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $28,400.61, will be applied to maintenance
dredging to be completed by June 30, 1938, under a contract to be
entered into for the removal of shoals in the channel from the Green-
point Avenue Bridge to the Meeker Avenue Bridge.
   It is expected that the conditions of local cooperation will not
be complied with during the next 2 years. It is believed that further
maintenance dredging will not be necessary during the next 2 years.
Therefore, no funds can be profitably expended during the fiscal
year ending June 30, 1939.
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                        191
                                     Cost and financial summary
Cost of new work to June 30, 1937___--------------------------                                 $1,168, 354. 47
Cost of maintenance to June 30, 1937---------------------------                                   319, 890. 70
         Total cost of permanent work to June 30, 1937-----------                                1, 488. 245. 17

Net total expenditures_------------------------------------                                      1, 488, 245. 17
Unexpended balance June 30, 1937 _---------------     ------                                            28, 400. 61

         Total amount appropriated to June 30, 1937.------------- 1, 516, 645. 78

        Fiscal year ending June 30              1933          1934           1935            1936           1937


Cost of new work .                   --     $149,926.69                        -                                 --
Cost of maintenance___ ______________ ._    ___________                   $43, 085. 12   $12, 101. 45     $41, 599. 39

Total expended-------            ------      163, 300. 56   $3, 833. 09    22, 455.41     33, 137. 30      41, 599. 39
Allotted ---    ---   --    --               142, 799. 65   17, 795.23     50, 000. 00    55, 534. 44        -   --



Balance unexpended July 1, 1936_ ___-                                                               $70, 000. 00
Gross amount expended__--                                                                            41, 599. 39

Balance unexpended June 30, 1937_                           ----------                                  28, 400. 61

Amount (estimated) required to be appropriated for completion
of existing project 1________                     _______                                          429, 400.00
   1 Exclusive of available funds.

                                     28. HARLEM RIVER, N. Y.

  Location.-Harlem River and Spuyten Duyvil Creek, both in-
cluded in the project for the improvement of Harlem River, are two
connecting tidal waterways, of a joint length of about 8 miles, lying
wholly within the limits of Greater New York and separating Man-
hattan Island from the mainland. (See U. S. Coast and Geodetic
Survey Chart No. 274.)
  Previous projects.-Adopted by the River and Harbor Act of June
23, 1874. Total cost and expenditure was $21,000, for new work.
For further details see Annual Report for 1915, page 1762.
  Existing project.-This provides for a continuous channel 15 feet
deep at mean low water and 400 feet wide from East River to Hud-
son River, except in the vicinity of Washington Bridge, where the
adopted width is 354 feet, and at the rock cut through Dyckmans
Meadow, where it is 350 feet and the depth is 18 feet. It also pro-
vides for straightening the channel at Johnson Iron Works by mak-
ing a cut 15 feet deep and 400 feet wide. The length of channel in-
cluded in the project is about 8 miles. The mean tidal range varies,
according to locality, from 4.9 feet at Willis Avenue Bridge to 3.7
feet at Spuyten Duyvil Bridge; range of spring tides, 5.9 and 4.5
feet, respectively. Irregular fluctuations due to wind and baromet-
ric pressure vary from 3 feet below mean low water up to 4 feet
above mean high water at Willis Avenue Bridge and 'from 3.5 feet
below mean low water up to 3.5 feet above mean high water at Spuy-
ten Duyvil Bridge.
    The estimate of cost for new work, revised in 1928, is $5,470,000,
exclusive of amounts expended on1revious projects. The latest
(1928) approved estimate for annual cost of maintenance is $25,000.
         20196-37-pt. 1----13
192      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    The existing project was adopted by the River and Harbor Act of
June 18, 1878 (H. Doc. No. 75, pt. 9, 43d Cong., 2d sess.). It was
modified in 1886 (Annual Report for 1886, p. 674) and 1893 (An-
  nual Report for 1912, p. 198) and enlarged by the River and Harbor
Act of March 4, 1913 (H. Doc. No. 557, 62d Cong., 2d sess.). For
latest published maps see Annual Report for 1913, page 1644, and
the last-mentioned document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-The direct length of water front measured
along both shores of the Harlem River is about 16 miles; of this
length topographical features render 4 miles unavailable for com-
mercial use. About 5 miles in length of water front have been de-
veloped by the construction of 125 piers, wharves, and bulkheads,
with a total available dockage of 38,522 feet, of which 22,728 feet are
owned by the city of New York and 685 feet are owned by the State
of New York, the latter as a barge canal terminal. Of the terminals
owned by the city some are open to the public on equal terms, some
are leased for commercial use, and a few are used by city departments.
   Ten terminals have railroad connections, seven of which are owned
by the railroads, one by a private corporation, and two by the city
of New York. (For latest full description of terminal facilities see
Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
dredging and rock removal for straightening the channel at Johnson
Iron Works, work commenced October 3, 1936, was in progress at
the end of the fiscal year. During the fiscal year 20,056 cubic yards
of rock were drilled and blasted; 84,319 cubic yards of rock and
81,467 cubic yards of other material, place measurement, were
removed and disposed of; and 125,958 cubic yards, scow measure-
ment, of all material were towed to sea at a total cost of $374,742.95,
for new work.
   The cost of a survey preliminary to dredging from Willis Avenue
Bridge to Johnson Iron Works was $1,564.47, for maintenance.
   The total cost was $376,307.42-$374,742.95 for new work and
$1,564.47 for maintenance. The expenditures were $320,253.52.
   Condition at end of fiscal year.-The existing project is about 56
percent completed. A channel 15 feet deep at mean low water and
400 feet wide has been excavated from East River to High Bridge.
From High Bridge to Hudson River a channel 15 feet deep and 350
feet wide has been excavated. The controlling depth from East
River to Hudson River is, as shown by examinations, made from
1933 to 1937, 15 feet at mean low water through a navigable channel
varying from 90 to 350 feet in width except as follows: From 1,200
feet below High Bridge to 100 feet above it is 14 feet deep for a
width of 200 feet; at West One Hundred and Ninety-first Street it
is 14 feet deep; and from West Two Hundred and Third Street to
300 feet below the Broadway Bridge it is 12 feet deep for widths of
200 to 250 feet. The widths of channel through bridge draws are 98
to 100 feet, except at Broadway Bridge, where the width is 60 feet.
   The work remaining to be done under the existing project consists
in widening the dredged channel above High Bridge and completing
the straightening of the channel at the Johnson Iron Works.
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                              193

   The total cost of the existing project up to June 30, 1937, was
$3,247,192.82-$3,063,303.39 for new work and $183,889.43 for main-
tenance. The total expenditures amounted to $3,190,632.67.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, together with an allotment of $227,000 made during July
1937, a total of $698,909.84, will be applied as follows:
Accounts payable June 30, 1937__--------------------------__ $56,997.13
New work: Complete by May 8, 1939, under a continuing contract in
  force, by dredging and rock removal, the straightening of the
  channel at Johnson Iron Works------------------------------_      551, 624. 71
Maintenance: Complete by Apr. 30, 1938, under a contract in force,
  dredging to restore project depth from the southerly limit to the
  Broadway Bridge-----                                               90, 288. 00

         Total         --------------------                                                                                 698, 909. 84

  The work outlined above will complete the straightening of the
channel at Johnson Iron Works and will restore channel to a satisfac-
tory condition. Further maintenance dredging will not be necessary
during the next 2 years. Therefore, no funds can be profitably
expended during the fiscal year ending June 30, 1939.
                                              Cost and financial summary

Cost of new work to June 30, 1937  -----                                                                              $3, 084, 303. 39
Cost of maintenance to June 30, 1937--------------------                                                                  183, 889. 43

         Total cost of permanent work to June 30, 1937----------                                                        3, 268, 192. 82
Undistributed costs June 30, 1937-                                   ----                                                          436. 98

         Net total cost to June 30, 1937--------------------------                                                      3, 268, 629. SO
Minus accounts payable June 30, 1937                                            -----------                                     56, 997. 13

         Net total expenditures ---------------------------------                                                       3, 211, 632. 67
Unexpended balance June 30, 1937 _                                          -----------                                     471, 909. 84

          Total amount appropriated to June 30, 1937--------------3, 683, 542. 51

         Fiscal year ending June 30                      1933                  1934                  1935          1936             1937


Cost of new work_____                                    $926. 71    .....         ......---....            .        $506. 25    $374, 742. 95"
Cost of maintenance .______________________             5, 375. 37   -                             $5, 336.64     ....                 564. 47
                                                                                                                                    1-----
                                                                                                                                    1,

      Total cost ......
                   ------------------------             6, 302. 08 -----------                      5, 336.64        506. 25      376, 307. 42
Total expended ..-----------------------                           ...........
                                                       20, 084. 03-----------                       5, 309.09         27. 55      320, 253. 52
Allotted-------------- -----------------                  292. 18        -$441. 49                  6, 500.00   740, 000. 00       51, 000. 00


Balance unexpended July 1, 1936-_ --------                                                                                $741, 163. 36
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936___                           _                                                                             51, 000. 00
      Amount to be accounted for__   _--___        -----                                                                    792, 163. 36
Gross amount expended-------               ______ $320, 260. 34
Less reimbursements collected---------------------        6. 82
                                                                                                                           320 25R. 52"

     Balance unexpended June 30, 1937___----------------- -_                                                               471, 909. 84
Amount covered by uncompleted contracts_----------------_                                                                  381, 488. 20'

         Balance available                    June 30, 1937 ------------------                                                  90, 421. 64
194       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937________-----      _______________          $227, 000. 00
      Balance available for fiscal year 1938 -----------   _____     317, 421. 64

Amount (estimated) required to be appropriated for completion
of existing project 1- - - _____- ______      ____________        1, 855, 000. 00
1 Exclusive of available funds.

          29. HUDSON RIVER CHANNEL,         NEW YORK HARBOR

   Location.-Hudson River empties into the Upper Bay of New
York Harbor at the Battery, New York City. The section included
under this title extends from deep water off the Battery and Ellis
Island to the northern limits of New York City, a distance of about
16 miles. (See U. S. Coast and Geodetic Survey Charts Nos. 274, 745,
and 746.)
   Previous projects.-Adopted by acts of March 3, 1875, June 6,
1900, March 3, 1905, and March 4, 1913. The total costs and ex-
penditures were $69,629.12, all for new work. For further details see
Annual Report for 1915, page 1765.
   Existing project.-This provides for a channel 45 feet deep at
mean low water and 2,000 feet wide, suitably widened at the bends,
from deep water in Upper Bay to West Fortieth Street, Manhattan,
thence 48 feet deep at mean low water of the same width to West
Fifty-ninth Street; for a channel 40 feet deep at mean low water
for the full width of the river extcnding from the north line of
Fifty-ninth Street to the south side of Little Basin, and thence a
channel of the same depth to deep water in the Upper New York
Bay off Ellis Island, substantially as shown on maps in House Docu-
ment No. 309, Seventy-second Congress, first session, subject to the
provision that no dredging shall be done under the project within 50
feet of the pierhead lines; a channel 750 feet wide and 30 feet deep
along the Weehawken-Edgewater water front; the removal of a
shoal on the New York side between West Nineteenth and West
Sixty-first Streets to a depth of 40 feet; and the removal of an
obstruction north of the mouth of Spuyten Duyvil Creek to the
depth of the surrounding river bottom. The length of the section
included in the project is about 16 miles. Mean tidal range at the
Battery, 4.4 feet, and at the mouth of Spuyten Duyvil Creek, 3.7 feet;
mean range of spring tides 5.3 feet and 4.5 feet, respectively; irregu-
lar fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water at the Battery up to 4 feet above mean high
water, and at the mouth of Spuyten Duyvil Creek from 3.5 feet
below mean low water up to 3.5 feet above mean high water.
   The estimate of cost for new work, revised in 1937, is $6,383,000,
exclusive of the amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $169,000.
   The existing project was authorized by the following river and
harbors acts: The act of March 4, 1913, provided for the 30-foot
channel from Ellis Island to Newark Street, a depth of 40 feet
thlrough shoal off Hamburg Avenue, a channel 26 feet deep and 550
feet wide along Weehawken-Edgewater water front; removal of
shoal on east side of river between West Nineteenth and West Thirty-
second Streets, removal of rock near the Battery and an obstruction
     RIVERS AND HARBORS-FIRST          NEW YORK, N. Y., DISTRICT     195

near Spuyten Duyvil Creek (H. Doc. No. 719, 62d Cong., 2d sess.) ;
the act of March 4, 1915, authorized additional dredging in the vicin-
ity of the shoal off Hamurg Avenue (A. R. 1914, pp. 234-235); the
act of August 8, 1917, provided for the removal of a shoal between
West Thirty-second and West Sixty-first Streets to a depth of 40 feet
and widening the 40-foot channel between the Battery and Canal
Street to 2,000 feet (H. Doc. No. 1697, 64th Cong., 2d sess) ; the act
approved March 3, 1925, provided for increasing the depth of the
channel along the Weehawken-Edgewater water front to 30 feet
at mean low water and the width to 750 feet (H. Doe. No. 313, 68th
Cong., 1st sess.) ; the act of January 21, 1927, modified the conditions
of local cooperation stated in House Document No. 313, Sixty-
eighth Congress, first session; the act of July 3, 1930, provided for
increasing the width of the 40-foot channel between Twentieth
Street, Manhattan, and Ellis Island, and for a 30-foot channel be-
tween the west channel line of the 40-foot channel and the channel
along Jersey City water front (H. Doc. No. 450, 70th Cong., 2d
sess.) ; and the act of August 30, 1935, authorized the widening of
the 40-foot channel to full width of the river from the north line of
Fifty-ninth Street to the south side of Little Basin, and thence a
channel of the same depth to deep water in Upper New York Bay
off Ellis Island (H. Doc. No. 309, 72d Cong., 1st sess.); and waiver
of all conditions of local cooperation with respect to the project at
Weehawken and Edgewater (Rivers and Harbors Committee Doe.
No. 49, 72d Cong., 2d sess.), and the act of August 26, 1937, pro-
vided for the 45- and 48-foot channel, 2,000 feet wide (Senate Com-
mittee Print, 75th Cong., 1st sess.). Prior to inclusion in the River
and Harbor Act of August 30, 1935, the modifications authorized
therein were also authorized by the Public Works Administration
September 6, 1933, and April 27, 1935. For latest published maps
see H. Doc. No. 450, 70th Cong., 2d sess.; H. Doc. No. 309, 72d
Cong., 1st sess.; and Senate Committee Print, 75th Cong., 1st sess.
    Terminal facilities.-The direct length of water front included in
the project for improvement, measured along both shores of the
river, is 32 miles; of this length, 7 miles of the Manhattan water
front and 10 miles of the New Jersey water front have been devel-
oped for commercial use by the construction of terminals consisting
of piers, bulkheads, warehouses equipped with modern appliances
for handling freight, modern coal piers, bridges for the transfer of
cars to and from floats, marine railways, drydocks, and ferry racks.
   The total available dockage along the Manhattan water front in
use for commercial purposes is 163,600 linear feet and along the
New Jersey water front about 213,800 linear feet.
   Most of the terminals are efficient in respect to the method of
freight handling. The methods in use vary from the most modern
freight-handling appliances to hand trucks. The appliance installed
is generally that believed to be the best adapted for use in transfe.r-
ring the particular class of freight to be handled. Many terminals
have direct railroad connection.
   The New York City authorities are constantly adding to and im-
proving the terminals along the Manhattan water front. (For latest
full description of terminal facilities see Port Series No. 20, Corps
of Engineers.)
196     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year--Public Works funds.-
None. The expenditures were $4.12 for the payment of accounts
payable at the beginning of the fiscal year.
   Regular funds.-The U. S. seagoing dredge A tiantic was em-
ployed from July 1 to August 30, 1936; the U. S. seagoing dredge
Raritan from July 1, 1936, to May 31, 1937; and the U. S. seagoing
dredge Chinook from October 26, 1936, to May 9, 1937, and May 21
to 31, 1937, in dredging to 30 feet in the channel along the Wee-
hawken-Edgewater water front, removing a total of 2,367,846 cubic
yards, bin measurement, of material. The U. S. derrick boat E. R.
101 was employed from July 14 to August 5, 1936; and the U. S.
derrick boat Babcock from November 20 to December 30, 1936 and
February 4 to 7, 1937, in ironing off isolated shoals along the Wee-
hawken-Edgewater water front to the depth of the surrounding
bottom. Total cost of dredging and ironing off shoals was
$567,010.10, all for new work.
   The U. S. seagoing dredge Chinook was employed from May 10
to 21, 1937, and June 1 to 11, 1937; the U. S. seagoing dredge Raritan
from June 1 to 6 and 28, 1937; and the U. S. derrick boat Babcock
on June 19, 1937, in dredging to 40 feet the area along the westerly
channel line from a point opposite Canal Street to opposite West
Twentieth Street, New York City, and an area off the Battery, re-
moving a total of 105,974 cubic yards, bin measurement, of material
at a cost of $37,346.17, for new work.
   The cost of surveys and contingencies preliminary to dredging
for new work was $9,971.46-$6,510 for Weehawken-Edgewater
Channel, $777.97 for 2,800-foot widening, and $2,683.49 for pierhead
to pierhead widening. The cost of surveys to determine channel con-
ditions was $816.86 for maintenance.
   The total cost of all work, regular funds, was $615,144.59-$614,-
327.73 for new work and $816.86 for maintenance. The total expendi-
tures were $602,929.82.
   The total expenditures were $602,933.94, including $4.12 Public
Works funds.
   Condition at end of fiscal year.-About 78 percent of the existing
project has been completed. About 97 percent of the work of widen-
ing the main channel from Ellis Island to West Twentieth Street,
Manhattan, to 2,800 feet has been completed. About 47 percent of
the work of widening the 40-foot channel for the full width of the
river from Ellis Island to West Fifty-ninth Street, Manhattan, has
been completed. About 93 percent of the work of widening and
deepening Weehawken-Edgewater Channel to project dimensions has
been completed.
   The controlling mean low-water depth through the channel along
the Jersey City water front, when examined in May and June 1937,
was 30 feet except for an area about 100 feet wide along the west
channel line between Morris Canal Basin and 1,300 feet below Newark
Street, where the limiting depth is 26 feet.
   When examined intermittently from June 1934 to June 1937 the
controlling mean low-water depth was 40 feet for a width of 2,800
feet from opposite Ellis Island to 1,300 feet below Newark Street
and thence for the full width of the river to West Fifty-ninth Street
except for shoals extending channelward not more than 180 feet along
the pierhead lines at the following localities: Along the Hoboken
water front the limiting depth was 35 feet; along the Weehawken
      RIVERS AND HARBORS---FIRST                NEW YORK, N. Y., DISTRICT            197

water front the limiting depth was 35 feet at the southern end and
28 feet at the northern end, opposite West Fifty-ninth Street; along
the Manhattan water front, off pier A, Battery, the limiting depth
was 32 feet, from Canal Street to West Twentieth Street the limiting
depth was 33 feet, thence to West Thirty-fourth Street the limiting
depth was 35 feet, thence to West Fifty-ninth Street over separated
shoals the limiting depth was 33 feet, and thence to West Sixty-first
Street the limiting depth was 32 feet.
    When examined during the progress of dredging operations from
March 1934 to June 1937 the controlling mean low-water depth in
the Weehawken-Edgewater Channel was 30 feet for the full channel
width of 750 feet except for a shoal along the channel line about
3,500 feet long opposite West One Hundred and Fifteenth Street
to West One Hundred and Twenty-ninth Street where the limiting
depth was 23 feet and several scattered shoal areas in the center of
the channel where the limiting depth was 27 feet.
    The work remaining to be done under the existing project consists
of completing the deepening of the channel along the Weehawken-
Edgewater water front to dimensions authorized by the River and
Harbor Acts of March 3, 1925, and August 30, 1935; deepening and
widening the 2,800-foot channel to West Twentieth Street as author-
ized by the River and Harbor Act of July 3, 1930; completing the
widening of the entire channel below West Fifty-ninth Street to a
depth of 40 feet, authorized by the River and Harbor Act of August
30, 1935; and dredging the 45- and 48-foot channel for a width of
2,000 feet from Upper Bay to West Fifty-ninth Street, authorized
by the River and Harbor Act of August 26, 1937.
   The cost and expenditures to June 30, 1937, Public Works funds,
were $668,820.36 for new work.
    The cost to June 30, 1937, regular funds, was $6,131,999.28-$4,336,-
708.46 for new work and $1,795,290.82 for maintenance. The expendi-
tures were $6,103,008.50.
   The total cost of the existing project to June 30, 1937, all funds,
was $6,800,819.64-$5,005,528,82 for new work and $1,795,290.82 for
maintenance. The total expenditures were $6,771,828.86.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, together with allotments amounting to $481,000 made in
July 1937, a total of $481,094.28, will be applied as follows:
Accounts payable June 30, 1937                                               $28, 990. 78
New work:
    Operate 1 United States sea-going dredge for 41/2
      dredge months (January-May 1938) on the wid-
      ening of the 40-foot chanel below West Fifty-
     ninth Street-----------------------------            $220, 000.00
    Operate 1 United States sea-going dredge for 1
      month (June 1938) to complete the 2,800-foot
      widening from Battery to West Twentieth
      Street                                   ___------------------------------------
                                                             37,000. 00
    Operate 1 United States sea-going dredge for 3
     months (July-September 1937) to complete the
      deepening of the channel along the Weehawken-
     Edgewater water front to 30 feet____ ____ _             81, 103. 50
                                                                             338, 103. 50
Maintenance: Operate 1 United States sea-going dredge for 41/
months (November 1937-March 1938) in restoring the Manhattan
  water front to project depth_______                           __.._        114, 000. 00
      Total __----._           -      -     __-_______                       481, 094.28
198            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The widening of the channel below West Fifty-ninth Street should
be completed. Maintenance dredging should be continued. There-
fore, the sum of $337,000 can be profitably expended during the fiscal
year ending June 30, 1939, as follows:
New work: Operate 1 United States sea-going dredge for about 4
months during the fiscal year to complete the widening of the 40-foot
channel below West Fifty-ninth Street_________________________        $237, 000
Maintenance: Operate 1 United States sea-going dredge for about 4
   months during the fiscal year____________________________________                                             100, 000

           Total ____-                                                                                           337,000
                                     Cost and financial summary

Cost of new work to June 30, 1937_________________-----                                              1 $5,075,157. 94
Cost of maintenance to June 30', 1937__                                                                1, 795, 290. 82

     Total cost of permanent work to June 30, 1937                                                     6, 870, 448. 76
Minus accounts payable June 30, 1937_________________________                                              28, 990. 78
           Net total expenditures___________________________                                         16, 841, 457. 98
Unexpended balance June 30, 1937____________________________                                                        94. 28

           Total amount appropriated to June 30, 1937_                                                  6, 841, 552. 26

           Fiscal year ending June 30                1933          1934           1935              1936            1937


                  ...
Cost of new work _________     _______          $152, 540. 35 $320, 141. 88 $158, 997.47       $480, 476. 54    $614, 327. 73
Cost of maintenance---------------_              107, 510. 56   70, 800. 39 250, 388. 99         16, 175. 15          816. 86
      Total cost__________________________       260, 050. 91   390, 942. 27   409, 386. 46     496, 651. 69     615, 144. 59
Total expended ....      _                       2__289,
                                                    043. 43     393, 560. 79   405, 961. 26     511, 816. 09     602, 933. 94
Allotted        ._______________________________278, 896. 57    796, 236. 78   353, 594. 28     767, 336. 91     -60, 000. 00

Balance unexpended July 1, 1936-------------------------------                                             $663, 028. 22
Deducations on account of revocation of allotment____________                                                60, 000. 00

      Net amount to be accounted for__________________603, 028. 22
Gross amount expended_____________________________      602, 933. 94

Balance unexpended June 30, 1937---_____--
                                      ------- ______                                                                94. 28
Outstanding liabilities June 30, 1937__________________                                        __              28, 990. 78
     Balance available June 30, 1937_                                                                      -- 28, 896. 50
Amount allotted during July 1937________---------                                         _____              481, 000. 00

Balance available for fiscal year 1938--------____________                                                  452, 1.03. 50
Amount (estimated) required to be appropriated for completion
   of existing        project 2_______________________________________                                  1, 039, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
       For new        work 2                                        ---                  ---                237, 000. 00
       For maintenance 2-                                                                                   100, 000. 00
                 2           _
         Total __     --_                                                                                   337, 000. 00
   1 Includes $668,820.36 Public Works funds.
   2 Exclusive of available funds.



     30. NEW YORK HARBOR-COLLECTION AND REMOVAL OF DRIFT
Location.-This project applies to the Lower and Upper Bays, New
York Harbor; Jamaica Bay, Bay Ridge, and Red Hook Channels.
Gowanus Creek Channel, Buttermilk Channel, East River, Newtown
      RIVERS AND HARBORS--F'IllSTNEW YORK, N. Y., DISTRICT               199

Creek, Harlem River, Hudson River Channel, N. Y.; and Staten
Island Sound and Newark Bay, N. J.
   Existing project.-This provides for the collection and removal of
drift from New York Harbor and its tributary waters, and author-
izes the Secretary of War to allot such amounts as may be necessary
for the work from appropriations for maintenance and improvement
of existing river and harbor works or other available appropriations,
and that this work hereafter shall be carried as a separate and dis-
tinct project. It is wholly a work of maintenance. The purpose of
the work is to afford relief from variable conditions of obstruction,
and no advance estimate of the amount of work required and its
proper cost can be made. The project adopted by the River and Har-
bor Acts of March 4, 1915, and August 8, 1917, was modified by the
River and Harbor Act of July 3, 1930, to provide for the method of
allotting funds and for carrying this work as a separate and distinct
project.
  T
    'rfinn al facilities.-Describedin the separate reports covered.
   Operations and results duLring fiscal year.-U. S. steam lighters
Manisees and Rockaway and U. S. tug Astoria were assigned to the
work of removing and disposing of drift when not employed on
other work. There were removed and disposed of during the year
221,696 cubic feet (1,732 cords) of driftwood, ranging in size from
small blocks up to timber of large dimensions, piles, pieces of
wreckage, etc.
   The cost of this work was $62,580.79, all for maintenance. The
expenditures were $61,038.74.
   Condition at end of fiscal year.-The existing project is one of
continuous maintenance for which no percentage of completion
exists. Navigation has been made safer by the continual patrol of
the harbor and the removal of large quantities of drift material.
The total cost of operations to June 30, 1937, has been $920,743.01.
The total expenditures amounted to $915,697.46.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, together with allotments totaling $59,998.65 made in
July 1937, a total of $65,253.07, will be applied as follows:
Accounts payable June 30, 1937_   ----------------------   --- $5, 045.55
Maintenance: Continue the work of drift removal by the use of 2
United States lighters (July 1937-June 1938)           __   _ 60, 207. 52

      Total_-_                                                     6________--------
                                                                    5, 253. 07
  It is necessary for the safe navigation of vessels that the removal
of drift material be carried on regularly. Therefore, the sum of
$75,000 can be profitably expended on this work during the fiscal
year ending June 30, 1939, by the operation of two lighters through-
out the fiscal year.
                        Cost and financial summary
Cost of new work to June 30, 1937_--                         -
Cost of maintenance to June 30, 1937_                            $920, 743.01
     Total cost of permanent work to June 30, 1937___-            920, 743. 01
Minus accounts payable June 30, 1937------------------____          5, 045.55
     Net total expenditures -.                                    915, 697. 46
Unexpended balance June 30, 1937__-----_
                                .....            ---                5,254. 42

      Total amount appropriated to June 30. 1937----------        920. 951. 88
200             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


          Fiscal year ending June 30            1933         1934            1935           1936               1937

Cost of new work ..........
Cost of maintenance.......
                      ------------------$35, 935.98       $57, 369. 62    $51, 383. 91   $54, 024. 55        $62, 580. 79
Total expended-.----------------------36, 689. 45          54, 848. 80     51, 152. 11    55, 605. 93         61, 038. 74
Allotted-.----------------.-----------..      32,990.44   101,933.41     i 60, 000.00     60,000.00     j-

Balance unexpended July 1, 1936 ----    ___________________
                                              --                                                   $66, 293. 16
Gross amount expended--_________---_______    ____                                                  61, 038. 74
      Balance unexpended June 30, 1937 --------------------                                         -5, 254. 42
Outstanding liabilities June 30, 1937_ -______-____--------5,                                           045. 55
    Balance available June 30, 1937 --------------------                                                    208. 87
Amount allotted during July 1937__----------------------------                                          59, 998. 65
          Balance available for fiscal year 1938-__-------------                                        60, 207. 52
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1___________________----                                                     75, 000. 00
   1Exclusive of available funds.

                                     31. IRVINGTON HARBOR, N. Y.

   Location.--This harbor extends along the east shore of the Hudson
River for a distance of 0.4 mile, 25 miles north of the Battery, New
York City. The distance to the 27-foot contour in the river from
the wharves varies from 200 to 450 feet. (See U. S. Coast and Geo-
detic Survey Charts Nos. 281 and 748.)
   Existing project.-This provides for dredging to a depth of 27
feet below mean low water the area lying between deep water in
the Hudson River and a line 100 feet channelward of the Turner Co.
lumber wharf. The length of the improvement is about 1,600 feet.
Mean tidal range, 3.4 feet; mean range of spring tides, 4 feet; and
extreme recorded range is 8.3 feet. Irregular fluctuations are infre-
quent and do not materially affect navigation.
   The estimate of cost for new work, made in 1936, is $15,000. The
approved estimated cost of annual maintenance, made in 1936, is
$2,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 244, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
adopted the existing project subject to the condition that local inter-
ests agree to provide equal depths in the 100-foot strip fronting the
wharf of the Turner Co., and agree to make this wharf available
to the public on equal and reasonable terms. These provisions have
not yet been complied with.
   Terminal facilities.-Water terminals, four in number, with a total
available dockage of 2,000 feet, are located along the waterfront.
Railroad sidings are available adjacent to the waterfront properties.
The terminals are considered sufficient for present and future needs.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project and there has been no cost or expenditure. The controlling
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                    201

depth in the area included in the existing project was 18 feet below
mean low water when examined in August 1936.
  Proposed operations.-No funds are available for this project and
no work is proposed during the fiscal year ending June 30, 1938.
  It is expected that the conditions of local cooperation will be co'n-
plied with during the next 2 years. Therefore, the sum of $15,000
can be profitably expended during the fiscal year ending June 30,
1939, in dredging under contract the area included in the existing
project to dimensions authorized by the River and Harbor Act of
1937.
                            Cost and financial summary
Cost of new work to June 30, 1937---------------------------------    -
Cost of maintenance to June 30, 1937___------------------     -- _______

      Net total expenditures___________________
Total amount appropriated to June 30, 1937__________________________
Amount (estimated) required to be appropriated for completion of
  existing project_ _------------                                       $15, 000

Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work                ----                                 15, 000

                        32. TARRYTOWN HARBOR, N. Y.

   Location.-This harbor extends along the east shore of Hudson
River for a distance of about 1 mile below Kingsland Point, 29 miles
above the Battery, New York City. The distance to the 12-foot con-
tour in the river from the pierheads varies between 1,600 and 2,200
feet. (See U. S. Coast and Geodetic Survey Chart No. 281.)
   Existing project.-This provides for a channel along the wharf
front of the harbor 12 feet deep at mean low water and 250 feet wide.
and northerly and southerly connections with deep water in Hudson
River of the same depth and 150 feet wide; total length, about 5,700
feet. Mean tidal range, 3.1 feet; mean range of spring tides, 3.8 feet;
extreme range due to wind and barometric pressure, 8.2 feet; irregular
fluctuations are infrequent and do not materially affect navigation.
   The estimate of cost for new work, revised in 1935, is $58,500. The
latest (1935) approved estimate for annual cost of maintenance is
$5,000.
   The existing project was adopted by the following river and liar-
bor acts: The act of March 3, 1905, provided for a channel 100 feet
wide in the approach arms and 150 feet wide along the water front
 (H. Doc. No. 283, 56th Cong., 1st sess.) ; the act of August 30, 1935,
provided for the present project widths (H. Doc. No. 262, 72d Cong.,
1st sess.). The project documents contain the latest published maps.
   Terminal facilities.-Water terminals, seven in number, with a
total available dockage of 4,212 feet, are located along the water
front; railroad connections are adjacent to the water front. The
existing terminals are considered adequate for present commerce.
   Operations and results during fiscal year.-Under a contract for
dredging to widen the entrance channels and the channel along the
wharf fronts, authorized in 1935, and to remove shoals which have
formed in the channels previously dredged, work was commenced
April 7, 1937, and in progress at the end of the fiscal year. During
the fiscal year, a total of 30,715 cubic yards, place measurement, of
202          REPORT OF CHIEF OF' ENGINEERS, U. S. ARMY, 1937

material was removed at a cost of $15,715.69 for new work, and a
total of 8,164 cubic yards, place measurement, of material was re-
moved at a cost of $4,165.76 for maintenance.
   The cost of a survey preliminary to contract dredging was $540.83
for new work and $185.10 for maintenance.
   The total cost of all work during the fiscal year was $20,607.38-
$16,256.52 for new work and $4,350.86 for maintenance. The total
expenditures were $17,807.36.
   Condition at end of fiscal year.-The existing project is about 96
percent completed. The controlling depth at mean low water, as
shown by an examination made in June 1937, was 12 feet for full
project dimensions, except for a few minor shoals having a least
depth of 11.5 feet. The work remaining to be done under the existing
project is to complete the widening of the north and south entrance
channels and the channel along the wharf fronts as authorized by the
River and Harbor Act of Augu:t 30, 1935.
   The total cost of the existing project to June 30, 1937, was $123,-
014.12-$67,109.95 for new work and $55,904.17 for maintenance. The
expenditures were $120,214.10.
   Proposed operatio'ns.-The balance unexpended, at the end of the
fiscal year, amounting to $6,792.64, will be applied as follows:
                              ----------------------------------- $2, 00. 02
Accounts payable June 30, 1937___
New work: Complete by July 14, 1937, under a contract in force, the
  widening of the project channel as authorized in 1935 _--....--                                                         3, 045.62
Maintenance: Complete by July 14, 1937, under a contract in force, the
restoration of the channel to dimensions previously provided ..-...                                                         947. 00

         Total __- ____ -                  ____ ________-_                                                                 6, 792. 64
   The new work will complete the existing project as authorized in
1935.     Further maintenance dredging will not be necessary during the
next 2 years. Therefore, no funds can be profitably expended during
the fiscal year ending June 30, 1939.
                                             Cost and financial summary

Cost of new work to June 30, 1937---_                                                                                 $67, 109. 95
Cost of maintenance to June 30, 1937                                 -            - -                      -              55,904. 17

      Total cost of permanent work to June 30, 1937-                                                  -               123, 014. 12
Minus accounts payable June 30, 1937-...........    --                                                - --              2, 90->,
                                                                                                                              .1.02
     Net total expenditures-------------------------------      120, 214. 10
Unexpended balance June 30, 1937---------------------------------6, 792. 64
        Total amount appropriated to June 30, 1937_______________                                                     127, 096. 74

        Fiscal year ending June 30                                1933       1934              1935            1936           1937


Cost of new work --------------------------------                             - --      --      -------    -------          $16,256.52
Cost of maintenance_     -- __.-          -_------
                                            ...                               ----
                                                                         ____----              $180. 65         $55. 18       4, 350.86
      Total cost ---------------             --------                    -180.                        65         55.18       20,607.38

Total expended __________----------------
                ..                                              ----------         ------------
                                                                                 ___                           235.83        17,807.36

Allotted .   ------------------------------------------------                                10, 000.00         235. 83      14, 600. 00
     RIVERS AND HARBORS-FIRST                 NEW YORK, N. Y., DISTRICT         203

                               -----------------------------
Balance unexpended July 1, 1936_                                         $10, 000. 00
Amount allotted from War Department            Appropriation
Act approved April 26, 1934_ _______-_--------------    $2, 791.91
Amount allotted from War Department Appropriation
Act approved May 15, 1936            ------------------ 11, SOS. 09
                                                                          14, 600. 00

                                ------------------
      Amount to be accounted for_                                 -       24, 600. 00
                    --
Gross amount expended        _--     _ _----------------                  17, 807. 36

      Balance unexpended June 30, 19,37___---           --------------     6, 792.64
Amount covered by uncompleted contracts          ------------------        6, 485. 92

      Balance available June 30, 1937__--------------                         306. 72

                       3'.   PEEKSKILL      HARBOR,        N.   Y.

   Location.-This harbor is an indentation about five-eighths of a
mile long and 11/4 miles wide in the eastern shore of Hudson River,
42 miles above the battery, New York City. (See U. S. Coast and
Geodetic Survey Chart No. 282.)
   Existing project.-This provides for a chanel 10 feet deep at
mean low water, 100 feet wide, and about 1.8 miles long, extending
from deep water in Hudson River north of the village to deep water
south of it, following generally the contour of the shore, and two
turning basins, 200 by 150 feet, of the same depth in front of the
lower and center wharves. Mean tidal range, 2.9 feet; mean range
of spring tides, 3.4 feet ; extreme range, 7.1 feet; irregular fluctua-
tions  *,reinfrequent and do not materially affect navigation.
   The estimate of cost for new work made in 1896 was $50,000. The
latest (1928) approved estimate for annual cost of maintenance is
$4,000.
   The existing project was adopted by the River and Harbor Act of
June 3, 1896 (H. Doc. No. 37, 53d Cong., 3d sess., and Annual Report,
1895, p. 999). The project was modified in 1896 (Annual Report,
1896, p. 839). For latest published map of the locality, see Annual
Report for 1903, page 885.
   Terminal facilities.- Water terminals, five in number, with avail-
able dockage of 2,240 feet, are located along the water front in
Peekskill; railroad connections are adjacent to the water front. Two
of the terminals, with available dockage of 1,420 feet, are pri-
vately owned; one of these, with available dockage of 650 feet, is
open to the public. One with available dockage of 200 feet is owned
by the New York Central Railroad, and two with available dockage
of 620 feet are used by a corporation. Four with available dockage
of 1,470 feet are provided with mechanical appliances for handling
cargoes.
   The existing terminals are considered adequate for present and
prospective needs of commerce.
    Operations and results during fiscal year.-Under a contract for
dredging to a depth of 10 feet in the project channel, work was com-
menced March 24, 1937, and in progress at the end of the fiscal
year. During this period there was removed a total of 20,448 cubic
yards, place measurement, of material at a cost of $11,779.02, for
maintenance.
204            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    The cost of a survey, preliminary to contract dredging, was
$903.17, for maintenance.
    The total cost was $12,682.19, all for maintenance.                                               The expendi-
tures were $11,394.15.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1899 at a saving of $30,600 under the estimated cost. The
controlling depth at mean low water as shown by examinations made
in September 1936 and June 1937 (during progress of maintenance
dredging) was 9 feet for a width of 80 feet in the south entrance
channel and 10 feet for full channel width in the north entrance
channel and the channel along the wharf fronts.
   The total cost to June 30, 1937, was $69,312.20-$19,400 for new
work and $49,912.20 for maintenance.           The expenditures were
$68,024.16.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $8,147.83, will be applied as follows:
Accounts payable June 30. 1937 -. _ _                          ____--            ___                            $1, 28S. 04
Maintenance: Complete by July 24, 1937, under a contract in force,
dredging to restore the channel to project dimensions -----------                                               6, 859. 79
            Total              _________-------------------_                 _                                   8, 147.83

  Further maintenance dredging will not be necessary during the
next 2 years. Therefore, no funds can be profitably expended
during the fiscal year ending June 30, 1939.
                                  Cost and financial suninmary

Cost of new work to June 30, 1937------------------------------- $19, 400. 00
Cost of maintenance to June 30, 1937----------------------------- 49, 912. 20
      Total cost of permanent work to June 30, 1937- --------------                                             69, 312. 20
Minus accounts payable June 30, 1937----------------------------                                                 1, 288. 04
     Net total expenditures-------------------------------------                                                68, 024. 16
Unexpended balance June 30, 1937------------------------------                                                   8, 147. 83
            Total amount appropriated to June 30, 1937----------------_                                         76, 171. 99

        Fiscal year ending June 30                1933             1934                1935           1936          1937


Cost of new work---------------
                 .....------------.                                                               -
Cost of maintenance ----------------------------------- ----
                                                          -                             $26. 84       $431.18     $12,682. 19
Total expended------.-------------                   -----           -
                                                                ----------                    _        458.02      11, 394. 15
Allotted-       -----------------------    ------------------------ 10,000.00 ------------ 10,000.00


Balance unexpended July 1, 1936___                               $9, 541. 98
Amount allotted from War Department Appropriation Act approved
  May 15, 193.6------------------------------------------------10, 000. 00
      Amount to be accounted for_                                     541.98
                                                                  1------------------------9,
Gross amount expended------------------------------- $11, 418. 15
Less reimbursements collected--------------------------    24. 00
                                                                  11, 394. 15

     Balance unexpended June 30, 1937- -----------------------                                                   8, 147. 83
Amount covered by uncompleted contracts_---------------                                                          8, 059. 30
            Balance available June 30, 1937 _--                              ----             -88.                         53
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT 205

                      34. WAPPINGER CREEK, N. Y.

   Location.-This creek is a small stream which empties into Hudson
River from the east, about 64 miles by water north of the Battery,
New York City, and one-half mile below the village of New Ham-
burg, N. Y. (See U. S. Coast and Geodetic Survey Chart No. 283.)
   Existing project.-This provides for a channel 8 feet deep at mean
low water, 80 feet wide and about 2 miles long, extending from the
mouth to about 200 feet below the lower falls. Mean tidal range, 2.7
feet; mean range of spring tides, 3.3 feet; extreme range, 7.1 feet;
irregular fluctuations are infrequent and do not materially affect
navigation.
   The estimate of cost of new work, made in 1890, was $13,000. The
latest (1928) approved estimate for annual cost of maintenance is
$750.
   The project was adopted by the River and Harbor Act of Septem-
ber 19, 1890 (H. Doc. No. 25, 51st Cong., 1st sess., and Annual Report,
1890, p. 758). For latest published map see Annual Report for 1904,
page 1051.
   Terminal facilities.-Water terminals, five in number, with avail-
able dockage of 2,415 feet, are located-one with available dockage
of 75 feet on the north side of the railroad trestle bridge and directly
connected with the railroad, one with available dockage of 300 feet
just north of the highway bridge, one with available dockage of 300
feet about 1 mile below the head of navigation, and two with avail-
able dockage of 1,740 feet close to the head of navigation. All are
privately owned and appear to be adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1892. As shown by an examination made in June 1936, the control-
ling depth at mean low water was 7 feet from the Hudson River to the
head of the improvement. The total costs and expenditures to June
30, 1937, were $41,332.02-$13,000 for new work and $28,332.02 for
maintenance.
   Proposed operations.-Thereare no funds available for this project,
and no work is contemplated during the fiscal year 1938.
   Shoaling has occurred throughout the project channel. The sum
of $10,000 can, therefore, be profitably expended, under contract for
maintenance, during the fiscal year ending June 30, 1939, in restoring
the channel to project dimensions.
                         Cost and financial summary
Cost of new work to June 30, 1937_____________________________ $13, 000. 00
Cost of maintenance to June 30, 1937__________________________ 28, 332. 02
      Total cost of permanent work to June 30, 1937 ____------__    41, 332.02
Net total expenditures --------- ________
                                        --       -    -       ___   41, 332. 02
Total amount appropriated to June 30, 1937_______________           41, 332. 02
Amount that can be profitably expended in fiscal year ending June
30, 1939. for maintenance_----------_______     _______            10, 000. 00
                       35. RONDOUT HARBOR, N. Y.

  Location.-This harbor comprises the tidal mouth, about 13/4 miles
in length, of Rondout Creek, whose source is about 18 miles west of
206     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Rondout. The creek empties into the Hudson River from the west,
about 89 miles north of the Battery, New York City, and 55 miles
south of Albany. (See U. S. Coast and Geodetic Survey Chart No.
283.)
    Existing project.-This provides for a channel 100 feet wide,
widened at the bends and 14 feet deep from deep water in Hudson
River to the Highway Bridge, 11/4 miles above the mouth, thence 12
feet deep to the west end of Island Dock, 1.8 miles .above the mouth,
two parallel dikes 350 feet apart, to maintain the channel, and for
a branch dike to extend upstream from the outer end of the north
dike to protect that dike from running ice in Hudson River.
    Mean tidal range, 3.5 feet; mean range of spring tides, 4.5 feet;
extreme range, 7 feet; irregular fluctuations, due to freshets, are
infrequent and do not materially affect navigation.
    The estimate of cost for new work revised in 1935 is $105,000. The
latest (1935) approved estimate for annual cost of maintenance is
$5,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 10, 1872 (S. Doc. No. 35, 42d Cong.,
2d sess.) provided for the parallel dikes, the branch dike, and an
entrance channel; the act of August 30, 1935 (Rivers and Harbors
Committee Doc. No. 17, 73d Cong., 2d sess.) provided for an ex-
tension of the 14-foot channel and for the 12-foot channel. The
latter document contains the latest published map.
   Local cooperation.-Furnishingof disposal areas is a requirement
affecting the project adopted by the River and Harbor Act of 1935.
    This condition has not been complied with.
   Terminal facilities.-There are 16 terminals along the waterway
under improvement. They consist of timber wharves, aggregating
9,250 feet in length, some equipped with transfer facilities, all
privately owned. Railroad spur connections are available to the
terminals on the north side of the harbor. The existing terminals
appear to be sufficient for the present needs of navigation. For
latest full description of terminal facilities see Port Series No. 25,
1936, Corps of Engineers.
   Operations and results during fiscal year.-None. The expendi-
tures were $3,956.85, for the payment of accounts payable at the
beginning of the fiscal year.
   Condition at end of fiscal year.-The existing project is about 85
percent completed; part of the diking originally proposed was not
built because deemed of doubtful usefulness. Two parallel dikes of
an aggregate length of about 5,000 feet, generally 350 feet apart, with
a now obsolete spur from the old lighthouse south of the south dike,
have been built across the bar at the mouth of the creek, and a chan-
nel 14 feet deep and 100 feet wide has been excavated between them
from deep water in the Hudson River for a length of about 3,000'
feet. A branch dike about 1,000 feet long extending northerly from
the outer end of the north dike was also constructed. All of the
dikes are in need of minor repairs. An examination made in 1936
showed that the controlling depth at mean low water was 14.0 feet
for five-eighths mile. The controlling depth for the next 11/ miles
varies from 14.0 to 8.6 feet. The work remaining to complete the
project consists of extending the existing channel to the west end of
Island Dock as authorized in 1935. The total cost and expenditures
         RIVERS AND HARBORS-FIRST                               NEW YORK, N. Y., DISTRICT                     207

of the existing project to June 30, 1937, were $242,385.33-$90,000
for new work and $152,38533 for maintenance.
  Proposed operations.--An allotment of $20,000 made in July 1937
will be applied to maintenance repairs to dikes by the use of Gov-
ernment plant and hired labor, and to new work, under a contract,
for dredging and rock removal to extend the existing project chan-
nel as authorized in 1935.
  Maintenance of dikes should be continued. Therefore, the sum of
$5,000 can be profitably expended during the fiscal year ending June
30, 1939, to be applied to repair of dikes by the use of Government
plant and hired labor during the period July-September 1938.
                                           Cost and financial summary

Cost of new work to June 30, 1937_________________                                                  $90, 000. 00
Cost of maintenance to June 30, 1937________________                                                152, 385. 33
      Total cost of permanent work to June 30, 1937_                                                242, 385. 33
Net total expenditures _                                                                            242, 385.33
Total amount appropriated to June 30, 1937_________                                                 242, 385. 33

           Fiscal year ending June 30               1933          1934         1935         1936          1937


Cost of new work -................
Cost of maintenance              -------          $2, 799.51--     ----      $13,697.14    $4,812.86 -----
Total expended.----------            ---------     2, 809. 51       -$10     13, 280. 25   1, 272. 90    $3, 956. 85
Allotted _-        ___                             2, 809. 51      13, 000    3, 000.00    2, 500.00    -_-   ---
Balance unexpended July 1, 1936       _________                  $3, 956. 85
Gross amount expended _______________________________             3, 956.85
Amount allotted from War Department Civil Appropriation Act, ap-
  proved July 19, 1937_                                          20, 000. 00
Balance available for fiscal year 1938 ___                       20, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance __________________________________                                           5, 000.00
1 Exclusive of available funds.

                                           36. HUDSON RIVER, N. Y.

    Location.-This river has its source in the Adirondack Mountains,
about 250 miles in a direct line and 315 miles following its course
to the Battery, New York City, and flows in a generally southerly
direction into New York Bay. The section under improvement ex-
tends from New York City to Waterford, a distance of about 155
miles. (See U. S. Coast and Geodetic Survey Charts Nos. 281 to
284, inclusive.)
  Previous projects.-The original project for improvement by the
United States was adopted by River and Harbor Act of June 30,
1834, and modified in 1852 and 1866.
  A second project was adopted by River and Harbor Act of July
13, 1892, and modified in 1899. The total cost and expenditures were
$5,459,390.58-$5,112,593.50 for new work and $346,797.08 for main-
tenance. For further details see page 1764, Annual Report for 1915.
   Eiristing project.-This provides for a channel 27 feet deep at
mean low water and 300 feet wide up to Hudson; thence 400 feet
           20196-37-pt. 1--14
208        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

wide through rock cuts, and 300 feet wide elsewhere, from Hudson
to the Albany-Greenbush Bridge in Albany; thence a channel 12 feet
deep at lowest low water to Waterford, with a general width of 400
feet to the dam at Troy and 200 feet thence to Waterford, increased
at bends and widened to form harbors in front of the cities of Troy
and Albany; and removal of the State dam at Troy and the con-
struction of a lock and dam about 21/2 miles below Waterford.
   The following table contains information concerning the various
features of the lock and dam included in the existing project:
Location:
    Below Waterford-------------------------------            miles      2. 5
    Above Battery, New York City------------------------do        __   152. 5
Lock :
    Clear width     ----------------------------------------   feet__ 44. 44
    Greatest length available for full width ---------------- do     _ 492. 5
      Lift at lowest stages   -----                             ---
                                                               do         16. 3
    Depth on miter sills at lowest low water:
         Upper ...                    -   -     -do                   -   16.3
         Lower                       ---                       do         14.0
Character of foundation: Rock.
Kind of dam: Fixed.
Type of construction: Concrete.
Completed: 1917.
Cost : $1,463,014.07.
  The channel is to be formed by dredging and rock excavation, and
to be maintained by dredging and by constructing new and raising
and repairing old longitudinal dikes, built partly under previous
projects and partly by the State of New York. The mean range of
pool elevation above the Federal dam at Troy, in seasons of moderate
rains, is about 2.2 feet, as determined in 1934. The mean tidal range
as determined in 1936 is about 4.7 feet at the Federal dam at Troy
and about 4.6 feet at Albany. The mean range during the summer
months is about 4.7 feet.
  The lowest low-water plane of the pool above the Federal dam at
Troy to Waterford is 14.33 feet above mean sea level at Sandy Hook,
N. J. In the tidal section of the river below the dam the assumed
lowest low-water plane from Troy to Albany is 2 feet below mean
sea level at Sandy Hook, N. J. In a measure, as the channels above
Hudson are improved, the range of tide increases and the low-water
plane falls.
  The estimated cost for new work, revised in 1932, is $14,066,000, ex-
clusive of amounts expended on previous projects. The latest (1930)
approved estimate for annual cost of maintenance is $337,300, includ-
ing $21,300 for operation and care of the lock and dam.
  The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the 12-foot chan-
nel and for the lock and dam at Troy (H. Doc. No. 719, 61st Cong.,
2d sess.); act of March 3, 1925, provided for the 27-foot channel
from Hudson to Albany (H. Doc. No. 350, 68th Cong., 1st sess.) ;
act of July 3, 1930, provided for the 27-foot channel below Hudson,
N. Y. (H. Doc. No. 210, 70th Cong., 1st sess.) ; and the Public Works
Administration September 6, 1933, and River and Harbor Act of
August 30, 1935, authorized a relocation of the 12-foot channel be-
tween Troy and Waterford (S. Doc. No. 155, 72d Cong., 2d sess.).
    RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT            209

Operation and care of the lock and dam were included in the project
July 1, 1935, under the provisions of the Permanent Appropriations
Repeal Act approved June 26, 1934.
   For maps showing part of the projected work see House Docu-
ments Nos. 719, Sixty-first Congress, second session; 350, Sixty-eighth
Congress, first session; 210, Seventieth Conoress, first session; and
Senate Document No. 155, Seventy-second Congress, second session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The piers and other terminal or transfer fa-
cilities served by the improvement are as follows:
   Between Waterford and the Federal dam at Troy there are 14
wharves, aggregating approximately 5,000 feet in length. The State
of New York has constructed a barge-canal terminal at Cohoes. The
Ford Motor Co. has constructed a dock 325 feet long on the west side
of the river just north of the Federal dam.
   Wharves aggregating about 7,350 feet in length extend practically
the entire length of the water front of the city of Troy. The State
also proposes to construct an additional terminal just south of the
site formerly occupied by the old State dam when needed.
   At the United States arsenal at Watervliet there is a stone bulk-
head 800 feet long with solid fill in the rear. Between this point and
Albany there are five timber .wharves, aggregating 4,275 feet in
length.
   At Albany there are 4,200 linear feet of concrete wharf wall, with
four transit sheds, one warehouse, and a 13,500,000-bushel grain ele-
vator, all provided by the Albany Port District Commission. The
State of New York has constructed a barge-canal terminal 1,400 feet
in length and the city of Albany has constructed concrete wharves
3,200 feet in length. At Island Creek (South Albany) the Delaware
& Hudson Railroad Co. owns approximately 3,100 feet of timber
wharves. On Westerlo Island, south of Albany, the Standard Oil
Co. of New York has constructed a concrete dock 466 feet in length.
In addition to the above there are approximately 10,300 linear feet
of timber wharves.
   At Rensselaer there are approximately 1,350 feet of timber
wharves. The Albany Port District Commission has constructed a
concrete wharf 1,200 feet in length. Private interests have con-
structed a timber wharf 490 feet in length along the pierhead line
and contemplate the construction of permanent wharves south of
Rensselaer to replace existing temporary unloading facilities. Be-
tween Albany and Hudson there are about 100 timber wharves, ag-
gregating 36,700 feet in length. At Hudson there are 12 timber
wharves aggregating 5,000 feet in length; at Athens there are 9 tim-
ber wharves aggregating approximately 4.000 feet. Between Hudson
and the upper limits of New York City wharves, many places
equipped with transfer facilities extend practically the entire length
of the water front of Poughkeepsie, Newburgh, Irvington, and Yon-
kers. The State of New York has constructed a barge-canal
terminal at Yonkers.
    It is expected that existing wharves and those proposed will be
ample for the Hudson River traffic. For latest full description of
terminal facilities see Port Series No. 25, 1936, Corps of Engineers.
210     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year-Regularfunds.-Under
a contract for dredging and rock removal in widening bends be-
tween Van Wies Point and Fitches Wharf, work was begun with
Emergency Relief funds September 4, 1935, and completed July 10,
1936. A total of 1,317 cubic yards of material other than ledge rock
and 44 cubic yards of ledge rock, all place measurement, was re-
moved at a cost of $1,502.25 for new work.
   Under a contract for dredging and rock removal between Bear
Island and Four Mile Point, work was begun August 11, 1936, and
completed October 10, 1936. A total of 3,661 cubic yards of ledge
rock and 18,763 cubic yards of material other than ledge rock, all
place measurement, were removed at a total cost of $74,290.59 for
new work.
   The U. S. pipe-line dredge DeWitt Clinton was employed from
July 1 to December 5, 1936, December 24 to 27, 1936, and from
April 14 to June 30, 1937, in removing shoals in the channel between
Albany and Hudson, N. Y. A total of 781,142 cubic yards, place
measurement, of material was removed at a cost of $161,359.03, all
for maintenance.
   The U. S. derrick boat No. 1 was employed from August 4 to Sep-
tember 14, 1936, and from May 3 to June 30, 1937, in removing
isolated shoals on rock areas in the channel at Van Wies Point and
11/2 miles south of Castleton, N. Y., and in removing snags and
stumps of trees from the shores of the river south of Albany. A
total of 3,852 cubic yards, place measurement, of material and 63
snags were removed at a cost of $9,006.93, all for maintenance.
   By use of Government plant and hired labor, repairs were made
to Breaker Island, Hillhouse Island, Base Island, Lower Patroons,
Beacon Island, Overslaugh No. 1, Overslaugh No. 2, Cedar Hill,
Cow Island, Castleton, Mulls Plaat Half, and New Baltimore dikes.
The cost of this work was $54,842.89, all for maintenance.
   The total cost of engineering, surveys, and contingencies was
$35,492.23, for maintenance.
   The lock and dam in the Hudson River at Troy, N. Y., was oper-
ated and maintained during the fiscal year, and work of repairing
lock property damaged by the flood of March 1936 was in progress.
Operations of the lock for the 1936 navigation season were sus-
pended December 23, 1936, and were commenced March 28, 1937,
for the 1937 season. The cost of work during the fiscal year was
as follows: Operations, $16,962.59; maintenance, repairs, and recon-
struction, $21,671.55, a total of $38,634.14, all for operating and care.
   The total cost of all work was $375,128.06-$75,792.84 for new
work, $260,701.08 for maintenance, and $38,634.14 for operation and
care of lock and dam at Troy, N. Y. The total expenditures were
$405,354.22.
   Emergency Relief funds.-There were no costs during the year.
The expenditures were $34,907.38 for the payment of accounts pay-
able at the beginning of the fiscal year. The total expenditures, all
funds, amounted to $440,261.60.
   Condition at end' of fiscal year.-About 94 percent of the existing
project has been completed. This includes the following items:
        RIVERS AND HAR BORS-FIRS i     NEW YORK, N. Y., DISTRICT    211

Troy lock and dam, removal of old dam at Troy and construltion
of 15,545 linear feet of new dikes so far as authorized at present.
In the reconstruction of old dikes 39,672 linear feet have been
raised to the adopted crest height. The work of deepening and
widening the channel under the project of 1910 has been completed,
with the exception of a small part of the widening, to form harbors
at Albany and Troy; it is not deemed necessary to complete this
widening for the present. The work of deepening the channel south
of Albany to 27 feet mean low water has been completed with the
exception of about 1,500 linear feet at the northern end.
  The controlling mean low-water depth from New York City to
Albany, N. Y., is 27 feet through a navigable channel 300 to 400
feet in width, except at Stockport, where the width is 230 feet, south
of Coxsackie, 90 feet; at Willow and Barren Islands, 250 feet; over
Mulls Rock, 160 feet; and Campbell Island, 200 feet. The con-
trolling lowest low-water depth from Albany to the lock and dam
at Troy is 12 feet through a navigable channel varying in width
from 400 feet at Albany to 110 feet near the south entrance to the
lock at Troy, except immediately north of the New York Central
freight bridge at Albany, where the depth is 101/2 feet, and at the
New York Central passenger bridge at Albany, where the width is
250 feet. At the lock entrance it is 11 feet deep for a width of 50
feet.    The controlling pool-level depth in the channel above the
lock at Troy to Waterford, the head of the improvement, is 12 feet
for a width of about 160 feet.
   The work remaining to be done to complete the project consists in
a small amount of channel widening to complete the harbors at Troy
and Albany, completing repairs to dikes, and a small amount of exca-
vation at Albany to complete a channel 27 feet deep at mean low water
from New York City to the site of the former Albany-Greenlbush
Bridge.
   The total cost to June 30, 1937, from regular funds was $15,089,-
203.32-$12,586,029.25 for new work and $2,503,174.07 for mainte-
nance. The expenditures were $15,077,776.52.
   With Public Works funds, the relocation of the channel above the
lock at Troy to Waterford has been completed. The cost and expendi-
tures were $238,350 for new work.
   With funds allotted from the Emergency Relief Appropriation Act
of 1935, the widening of the channel at bends has been completed.
The cost and expenditures were $310,000, for new work.
  The total cost, all funds, to June 30, 1937, was $15,637,553.32-
$13,134,379.25 for new work and $2,503,174.07 for maintenance, in-
cluding $65,809.36 for operation and care of lock and dam at Troy,
N. Y.     The total expenditures were $15,626,126.52.
  In addition. the sum of $454,272.93 was expended between August
18, 1915, and June 30, 1935, on the operation and care of the works of
improvement under the provision of the permanent indefinite appro-
priation for such purposes.
  Proposed operations.-Thebalance unexpended, including accounts
receivable, at the end of the fiscal year, together with an allotment of
212      REPORT OF, CHIEF OF ENGINEERS,                        U.   S. ARMY, 1937

$220,000 made in July 1937, a total of $258,197.17, will be applied as
follows:
Accounts payable June 30, 1937$---------------------------------32, 752. 24
Maintenance :
    Operate the U. S. pipe-line dredge DeWitt Clinton
      and attendant plant about 5 months in remov-
      ing shoals which have formed in the channel
      between Hudson and Waterford (July-Novem-
      ber 1937 --------------------------------        $103, 368. 00
    Operate the U. S. steam lighter No. 16 and derrick
      boat No. 1 for 7 months during the fiscal year
      in removing shoals which have formed over rock
      areas between Hudson and Troy and removing
      from the shores stumps and snags which are
      likely to be carried into the river-------------- 21, 415. 00
    Operate Government-owned plant consisting of pile
      driver, derrick boats, etc., in repairing dikes
      where found to be most urgently needed during
      the working seasons (July 1937-June 1938)--        39, 61. 00
    Miscellaneous surveys, sweepings, and current ob-
      servations pertaining to maintenance operations
       (July 1937-June 1938)----------------------- 35, 000. 00
    Operate, maintain, and repair lock and dam at
      Troy, N. Y., during the fiscal year and com-
      plete work of repairs to lock property damaged
       by flood of March 1936___-________________-       26, 000. 93
                                                                     225, 444.93
         Total-                 -              --.                               258, 197. 17
  It is important that full project dimensions be maintained in the
channel, that dikes be kept in a proper state of repair, and that the
operation and care of lock and dam at Troy, N. Y., be continued.
The sum of $473,000 can, therefore, be profitably expended during
the fiscal year ending June 30, 1939, as follows:
Maintenance:
    Complete by June 30, 1939, under a contract to be entered into,
      the removal of Willow Island Dike and relocation of channel__ $135, 000
   Operate the U. S. pipe-line dredge DeWitt Clinton and attendant
      plant about 7 months in removing shoals which have formed in
      the channel between Hudson and Waterford (July 1938-
      June 1939)      -------------------------------------------     133, 000
    Operate U. S. derrick boat No. 1 and attendant plant for about 8
      months during the fiscal year in removing shoals which have
      formed over rock areas between Hudson and Troy and removing
      stumps and snags from the shores which are likely to be carried
      into the river       -----------------------------------------   25, 000
    Operate Government-owned plant consisting of pile driver, derrick
      boats, etc., in repairing dikes where found to be most urgently
      needed during the working seasons (July 1938-June 1939) ____ 115, 000
    Operate, maintain, and repair lock and dam at Troy, N. Y., during
      the fiscal year------------------------------------------        25, 000
    Miscellaneous surveys, sweepings, and current observations per-
      taining to maintenance operations (July 1938-June 1939) .---     40, 000

         Total----------------------------------------------                         473,000

                                 Cost and financial summary
Cost of new work to June 30, 1937 ______-__--------------
                                      --                                     $18, 246, 972. 75
Cost of maintenance to June 30, 1937 2_________ ______-------                  3, 304, 244. 08

      Total cost of permanent work to June 30, 1937-- ------                  21, 551,216. 83
  1Includes $310,000 Emergency Relief and $238,350 Public Works funds.
  2Includes $454,272.93 from permanent indefinite appropriation for operation and care.
        RIVERS AND HARBORSFIR                              ST NEW YORK, N. Y., DISTRICT                                 213
Plus accounts receivable June 30, 1937----                             -----------------                     $21, 325.44

      Gross total costs to June 30, 1937---------------------                                          21, 572, 542. 27
Minus accounts payable June 30, 1937-----------------------                                                 32, 752. 24

     Net total expenditures 12        ------------------                                               21, 539, 790. 03
Unexpended balance June 30, 1937 ___-- ---------------------                                                16, 871. 73

          Total amount appropriated to June 30, 193712---------                                        21, 556, 661. 76

         Fiscal year ending June 30                    1933           1934           1935            1936            1937


                                        ------ $293, 032. 11 $391, 389. 38 $225, 888. 59 $326, 268. 77
Cost of new work .-----......--------.............                                                                 $75, 792. 84
Cost of maintenance_----_--------------     __ __ 111, 487. 63 119, 837. 92 251, 633. 69 207, 510. 92              299, 335. 22

      Total cost      -_      __------         __   404, 519. 74   511, 227.30    477, 522. 28   533, 779. 69      375, 128. 06

Total expended--....-------------.........._        509, 396. 30   447, 589. 10    60, 161. 05   491, 629. 88      440, 261. 60

Allotted---------------------------------__         360, 822.14    563,401.70      75,914. 32    399,993.93         55,000.00


Balance unexpended July 1, 1936_________________---------                                                   $402, 133. 33
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936                                                                                            5, 000. 00
                                                                                                                5-------------------------------
      Amount to be accounted for --------------------------                                                  457, 133. 33
Gross amount expended------------------------   $451, 209.49
Less reimbursements collected ________--_         10, 947.89
                                                                                                             440, 261.60

      Balance unexpended June 30, 1937 ----------------------                                                   16, 871. 73
Outstanding liabilities June 30, 1937-                                                                          32, 752 .24

      Balance available June 30, 1937 -----------------------                                               -15, 880. 51
Accounts receivable June 30, 1937----------     --------                                                      21, 325.44

     Unobligated balance available June 30, 1937--------                                                       5, 444.93
Amount allotted during July 1937------------    ----------                                                   220, 000. 00

         Balance available for fiscal year 1938_____
                                                   ------------                                              225, 444. 93
Amount (estimated) required to be appropriated for comple-
tion of existing project 8_________-______________                                                          943, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance a_______________________---                                                  473, 000. 00
1Includes $310,000 Emergency Relief and $238,350 Public Works funds.
  2 Includes $454,272.93 from permanent indefinite appropriation for operation and care.
  a Exclusive of available funds.

37. GREAT LAKES TO HUDSON RIVER WATERWAY-ENLARGEMENT
              OF NEW YORK STATE BARGE CANAL
  Location.-This waterway consists of that portion of the New
York State Barge Canal system extending from the Hudson River
at Waterford to Oswego Harbor on Lake Ontario. (See U. S. Lake
Survey Charts Nos. 182, 183, 184, 185.)
  Existing project.-This provides for the allotment of Federal
funds to the State of New York for expenditure under suitable
Federal control and supervision in the improvement of the canal con-
necting Lake Ontario with the Hudson River. The improvement
includes deepening between locks to 14 feet at normal pool levels,
widening at bends and elsewhere, and iucreasing the overhead clear-
214     REPORT OF CHIEF OFIENGINEERS, U. S. ARMY, 1937

ance to 20 feet at maximum navigable stage at bridges and other
obstacles. The widths of channel to be provided under the project
are: 104 feet in earth cuts, 120 feet in rock cuts, 200 feet in river
sections, with widening at bends and elsewhere as may be necessary.
  The length of the waterway included in the project is about 184
miles, of which 160 miles are in the Erie Canal from Waterford
to Three Rivers Point and 24 miles are in the Oswego Canal from
Three Rivers Point to Oswego.
  The estimated cost for new work, made in 1933, is $27,000,000,
of which not to exceed $3,285,000 shall be expended on bridges and
other overhead structures. No estimate of maintenance with Fed-
eral funds is included, as maintenance of the canal is not a part of
the Federal project.
  The existing project was authorized May 28, 1935, under the Emer-
gency Relief Appropriation Act of 1935, and by the River and Harbor
Act approved August 30, 1935 (Rivers and Harbors Committee Doc.
No. 20, 73d Cong., 2d sess.),    which document contains the latest
published map.
  Local cooperation.--The project was authorized subject to the con-
dition that an agreement be entered into between the United States
and the State of New York embodying certain limitations and pro-
visions to safeguard the interests of general commerce and navigation,
insure Federal control of the disposition of Federal funds, and pro-
vide for Federal supervision of the work performed. All agreement
dated June 21, 1935, and a supplemental agreement dated March 30,
1936, amending the original agreement, have been entered into by the
Chief of Engineers, United States Army, and the superintendent of
public works, State of New York, embodying the conditions con-
tained in the above-mentioned report.
   Terminal facilities.-The State of New York has provided ter-
minal and transfer facilities at all important noints alo: the Erie
and Oswego Canals, and at Buffalo, Troy, Albany, and New York
Harbor. The freight-handling equipment, as well as the storage and
dock facilities, are governed by the requirements of the particular
locality. The State-owned terminal at Oswego is equipped with a
grain elevator of 1,000,000 bushels' capacity. The Albany Port Dis-
trict Commission has erected a grain elevator of 13,500,000 bushels
capacity at Albany. The State grain elevator in New York Harbor
on Gowanus Bay has a capacity of 2,000,000 bushels.
   Terminals at Buffalo, Rochester, Syracuse, Schenectady. Troy,
Albany, and Oswego are provided with direct railroad connections.
All State-owned terminals are open to the public on equal terms.
Lake-port terminals are extensive in character and appear ample to
meet all requirements.
  Operations and results du ring fiscal year-Reguarfunds.-Under a
contract in force for excavation of all material, including ledge rock,
and drilling of line holes between Hudson River and lock 2 at Water-
ford and between guard gate 2 at Waterford and lock 8 at Scotia, work
was commenced September 14, 1936, and 16.6 percent completed at the
end of the fiscal year. During this period 187,259 cubic yards, place
measurement of material including ledge rock, were removed, and
1,252 lineal feet of line holes were drilled at a cost of $350,923.17, for
new work.
    RIVERS AND HARBORS-FIRST          NEW YORK, N. Y., DISTRICT     215

   Under a contract in force for excavation of all material, including
ledge rock, and drilling of line holes between lock 2 at Fulton and lock
5 at Minetto, Oswego Canal, work was commenced August 20, 1936,
and 53.6 percent completed at the end of the fiscal year. During this
period 276,013.4 cubic yards, place measurement, of material including
ledge rock, and 8.6 cubic yards of boulders were removed, and 4,076
lineal feet of line holes were drilled at a cost of $1,071,656.31 for new
work.
   Under a contract in force for earth excavation, construction of
concrete spillway and furnishing and driving steel-sheet piling be-
tween lock 21 at New London and Sylvan Beach, work was commenced
August 24, 1936, and 40.6 percent completed at the end of the fiscal
year. During this period 326,700 cubic yards, place measurement, of
earth were removed, the concrete spillway was completed, and 17,500
square feet of steel-sheet piling were furnished and driven at a cost
of $158,243.54 for new work.
   Under a contract in force for raising four barge-canal bridges at
Harbor Road, Whitesboro-Marcy Road, Oriskany Road and Lawrence
Street, Rome, work was commenced August 18, 1936, and completed
June 5, 1937, at a cost of $100,830.12 for new work.
   Under a contract in force for raising three barge-canal bridges at
Mindenville, Lansings and Fincks Basin, work was commenced March
30, 1937, and 52 percent completed at the end of the fiscal year. The
total cost was $24,094.20 for new work.
   Under a contract in force for the raising of barge-canal bridge at
Mill Street, Rome, work was commenced November 17, 1936, and 73.3
percent completed at the end of the fiscal year. The total cost was
$18,390.97 for new work.
   Under a contract for furnishing and delivering quarry stone for
bank protection and other miscellaneous work at Utica, Nine Mile
Creek, and Rome, N. Y., work was commenced April 1, 1937, and 23.2
percent completed at the end of the fiscal year. During this period
32,452 tons of quarry stone were furnished and delivered at a cost of
$54,048.46 for new work.
   Under a contract for furnishing and delivering quarry stone for
bank protection and other miscellaneous work at Brewerton, Oak
Orchard, and Three Rivers, N. Y., work was commenced April 21,
1937, and 34.5 percent completed at the end of the fiscal year. During
this period 29,299 tons of quarry stone were furnished and delivered
at a cost of $59,741.36 for new work.
   The cost of contingencies preliminary to operations under proposed
contracts was $1,300.49 for new work. The total cost of all work with
regular funds was $1,839,228.62 for new work. The expenditures with
regular funds were $940,528.12.
   Emergency Relief funds.-Under a contract in force for earth
excavation between lock 13 at Yosts and lock 16 at Mindenville, work
was in progress at the end of the fiscal year and 94 percent completed.
In the fiscal year there were removed 589,288 cubic yards, place meas-
urement, of earth and 1,358 cubic yards of boulders, at a cost of
$498,982.14 for new work.
   Under a contract in force for earth excavation between lock 19
near Frankfort and lock 20 at Whitesboro, work was commenced
September 28, 1935, and completed October 30, 1936. The total
216     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

quantity of material removed under the contract was 842,238 cubic
yards, place measurement, of earth. In the fiscal year 262,262 cubic
yards of earth were removed at a cost of $127,258.31 for new work.
    Under a contract in force for earth excavation between station 2710,
Oneida Lake, and station 3085, Oak Orchard, work was commenced
September 26, 1935, and completed January 13, 1937. The total quan-
tities of material removed under the contract were 1,026,966 cubic
yards, place measurement, of earth and 2,110 cubic yards of boulders.
In the fiscal year 420,302 cubic yards, place measurement, of earth
and 830 cubic yards of boulders were removed at a cost of $337,573 for
new work.
    Under a contract in force for earth excavation between lock 10 at
Cranesville and lock 13 at Yosts, work was in progress at the end of
the fiscal year and 48 percent completed. In the fiscal year 324.309
cubic yards, place measurement, of earth and 1 cubic yard of boulders
were removed at a cost of $285,432.98 for new work.
    Under a contract in force for earth excavation between station 3085
at Oak Orchard and station 3308+05 at Three Rivers, work was
commenced September 9, 1935, and completed June 2, 1937. The total
quantities of material removed under the contract were 946,738.4
cubic yards, place measurement, of earth and 652 cubic yards of
boulders. In the fiscal year 462,040 cubic yards, place measurement,
  of earth and 458.8 cubic yards of boulders were removed at a cost of
 $345,801.20 for new work.
    Under a contract in force for earth excavation between lock 20 at
Whitesboro and guard gate 7 at Rome, work was commenced Jan-
uary 4, 1936, and completed April 20, 1937. The total quantities of
material removed under the contract were 1,071,025.15 cubic yards,
place measurement, of earth and 258.65 cubic yards of boulders. In
the fiscal year 539,505.15 cubic yards, place measurement, of earth
and 258.65 cubic yards of boulders were removed at a cost of $300,-
665.27 for new work.
    Under a contract in force for earth excavation b)etween guard gate
7 at Rome and lock 21 at New London, work was in progress at the
end of the fiscal year, and 78.8 percent completed. In the fiscal year
324,993 cubic yards, place measurement, of earth were removed at a
cost of $164,043.53 for new work.
    The total cost of all work with Emergency Relief funds was $2,059,-
756.43 for new work. The expenditures from Emergency Relief
funds were $2,217.226.61.
    The total cost, all funds, during the fiscal year was $3,898,985.05,
all for new work. The total expenditures, all funds, were
$3,157,754.73.
    Condition at end of fiscal year.-The project is about 22 percent
completed. Channel widening and deepening between lock 19 near
Frankfort and guard gate 7 at Rome, between locks 21 and 22 near
New London, and between locks 2 and 3 at Fulton, have been com-
pleted. Excavation of all material except ledge rock has been com-
pleted between Oneida Lake and Three Rivers. Four barge-canal
bridges have been raised. The present depth is 12 feet at normal pool
levels for the following widths: 75 feet in earth cuts, 94 feet in rock
cuts, and 200 feet in canalized rivers and lakes. The 29 locks, 22 in
Erie Canal east of Three Rivers Point, and 7 in Oswego Canal, north
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                       217
of Three Rivers Point, have a clear width of 45 feet, usable length of
300 feet, and depth over miter sills of 12 feet. Numerous fixed
bridges, transmission lines, and other structures span the waterway.
There are 71 bridges between Waterford and Three Rivers Point and
14 between Three Rivers Point and Oswego. The minimum clear-
ance under existing bridges and other overhead structures is 151/2
feet.
  The work remaining to be done to complete the project consists
of widening and deepening the channel by excavation, including the
removal of ledge rock and work incidenital thereto, between Hudson
River at Waterford and lock 19 near Frankfort, between guard gate
7 at Rome and lock 21 at New London. between lock 22 near New
London and lock 2 at Fulton, and between lock 3 at Fulton and Lake
Ontario at Oswego, the raising of 62 barge-canal bridges and 8
guard gates, and the revetment of banks with quarrystone where
necessary.
  The total cost of the existing project to June 30, 1937, was $5,968,-
802.29 for new work-$1,839,228.62 from regular funds and $4,129,-
573.67 from Emergency Relief funds, and the total expenditures were
$4,461,233.73-$940,528.12 from regular funds and $3,520,705.61 from
Emergency Relief funds.
  Proposed operations.-The balance unexpended of regular funds,
including accounts receivable, at the end of the fiscal year, together
with $5,000,000 allotted during the fiscal year, a total of $9,064,708.55,
will be applied as follows:
Accounts payable June 30, 1937-                                          $903, 937. 17
New work:
    Complete by Dec. 1, 1938, by dredging and
      rock removal, under a contract in force,
      the widening and deepening of the channel
      from the Hudson River to lock 2 at Water-
      ford and from guard gate 2 at Waterford to
      lock 8 at Scotia______------------------------- $1,694,371.38
    Complete by Dec. 1, 1938, under a contract in
      force, dredging and rock removal between
      lock 2 at Fulton and lock 5 at Minetto   -____
    Complete by Dec. 1, 1937, under a contract in
                                                         900, 000. 00

      force, the widening and deepening of the
      channel, and incidental work between lock
      21 at New London and Sylvan Beach -- _--           215, 500. 00
    Complete by Sept. 30, 1937, under a contract
      in force, the raising of 3 bridges: At Min-
      denville, at Lansings, and at Fincks Basin__         19, 600. 00
    Complete by July 31, 1937, under a contract in
      force, the raising of a bridge at Mill Street,
      Rome _------------------------------------            4,300. 00
    Complete by June 30, 1938, under a contract in
      force, the furnishing of quarry stone for
      bank protection at Utica, Nine Mile Creek,
      and Rome--------------------------------            174, 000. 00
    Complete by June 30, 1938, under a contract in
      force, the furnishing of quarry stone for
      bank protection at Brewerton, Oak Orchard,
      and Three Rivers---------------------- --           113, 000.00
    Complete by July 15, 1940, under a contract to
      be entered into, the dredging of all material
      except ledge rock between lock 8 near Scotia
      and lock 10 near Cranesville--------------         770, 000.00
218         REPORT' OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New York-Continued.
   Complete by July 15, 1940, under a contract to
     be entered into, the dredging of all material
     except ledge rock, and incidental work be-
     tween lock 18, near Jacksonburg, and lock
     19, near Frankfort      ___-___._----_    _    $1, 850, 000. 00
   Complete by July 15, 1940, under a contract to
     be entered into, the excavation of all mate-
     rial, including ledge rock, between Three
     River Point and lock 2, at Fulton               2, 050, 000. 00
   Complete by June 30, 1939, under contracts to
     be entered into, the raising of 13 bridges and
     furnishing of stone for bank protection-...        370, 000. 00
                                                                                 $8, 160, 771. 38
               Total_ _________-                                                  9, 064, 708. 55
  The balance unexpended, including accounts receivable, on June
30, 1937, of allotments from the Emergency Relief appropriation of
1935, amounting to $1,315,945.33, will be applied as follows:
Accounts payable June 30, 1937_______________________________                      $614, 496. 34
New work:
    Complete by Dec. 1, 1937, under a contract
      in force, the dredging of all material except
      ledge rock between lock 10 at Cranesville and
      lock 13 at Yosts                _       _     $500, 000. 00
    Complete by Nov. 1, 1937, under a contract
      in force, the dredging of all material except
      ledge rock between lock 13 at Yosts and lock
        16 at Mindenville_________________________                 77, 448. 99
      Complete by Dec. 31, 1937, under a contract
        in force, the dredging of all material except
        ledge rock between guard gate 7 at Rome and
        lock   21 at       New London _   ___   _ __    _ __ _    124, 000. 00
                                                                                    701, 448.99
          Total ___
                  --                 _____________-__
                                               --            __                   1,315, 945. 33

  The above work will result in the enlargement to project dimen-
sions of 135 miles of canal and an additional 11 miles partially com-
pleted by removal of overburden from rock areas (about 93 percent
of the estimated quantity of material other than ledge rock and about
24 percent of the ledge rock to be removed) ; the raising of 21 bridges
(32 percent of the total to be raised) ; and the furnishing and placing
of stone for bank protection in 50 miles of completed canal (about 58
percent of the total quantity of stone required).
   The improvement should be continued. Therefore, the sum of
$5,000,000 can be profitably expended for new work during the fiscal
year ending June 30, 1939, to reimburse the State of New York for
work of excavation, raising of bridges, and bank protection, under
contracts to be entered into during the fiscal year, as follows:
New work:
   Excavation of all material, including ledge rock between lock 16
     at Mindenville and lock 17 at Little Falls---------------- $2,565, 000
   Excavation of all material, including ledge rock from lock 17 at
     Little Falls to lock 18 at Jacksonburg---------------------- 1, 230, 000
   Raising of bridges and bank protection-______---.----            1, 205, 000
        Total-__________                                    __                         5,000.00
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                219
                                       Cost and financial summary
                             MAINTENANCE          AND    IMPROVEMENT FUNDS


Cost of new work to June 30, 1937---------------------------                                              $1, 839, 228. 62
Cost of maintenance to June 30, 1937-----

      Total cost of permanent work to June 30, 1937---------- --                                           1, 839, 228. 62
Plus accounts receivable June 30, 1937                                                                          5, 236. 67
     Gross total costs to June 30, 1937-------------------    1, 844, 465. 29
Minus accounts payable June 30, 1937---         -------------- 903, 937. 17

     Net total expenditures                                                                                         528. 12
                                                                                                              9--------------------------40,
Unexpended balance June 30, 1937-----------------------------                                              4, 059, 471. 88
           Total amount appropriated to June 30, 1937-------                                                  000, 000. 00
                                                                                                           5--------,

           Fiscal year ending June 30             1933      1934                 1935              1936               1937

Cost of new work---------                                                                                      $1,839, 228. 62
Cost of m aintenance- - - - - - - - - - - - - - - - - -- - - - - - - - - - - -- - -----                     - ----
Total expended                                                                                                       940, 528. 12
Allotted     ----   -                                                                        $5,000,000-


Balance unexpended July 1, 1936----------------------------$5, 000, 000. 00
Gross amount expended-------------------------- $949, 289. 80
Less reimbursements collected              -__-                      --                 8, 761. 68
                                                                                                              940, 528. 12
     Balance unexpended June 30, 1937__                                                                    4, 059, 471. 88
Amount covered by uncompleted contracts_                                                                   4, 013, 923. 47
      Balance available June 30, 1937---------------------                                                     45, 548. 41
Accounts receivable June 30, 1937------------------------------                                                 5, 236. 67

           Unobligated balance available June 30, 1937                      -------....                         50, 785. 08
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_-------------------------------                                                    5, 000, 000. 00
           Balance available for fiscal year 1938__                                           -            5, 050 785. 08
Amount (estimated) required to be appropriated for completion of
   existing project 1_             _        ___--                            -           -                12, 165, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work 1        --                                                                        5, 000 0          00
1Exclusive of available funds.
                                         EMERGENCY RELIEF FUNDS


Cost of new work to June 30, 1937_                             ----------                                  4, 129, 573. 67
Cost of maintenance to June 30, 1937------------------------
      Total cost of permanent work to June 30, 1937------------- 4, 129, 573. 67
Undistributed costs June 30, 1937--- --------------------      _      3, 968. 58
      Net total cost to June 30, 1937---------------------___                                              4, 133, 542. 25
Plus accounts receivable June 30, 1937-------------------------                                                 1, 659. 70
           Gross total costs to June 30, 1937                 __                                  --       4, 135, 201. 95
220               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937-----                                                      _______                  -_______$614, 496.34

      Net total expenditures-------------------- --------                                                                          3, 520, 705. 61
Unexpended balance June 30, 1937______________        __________                                                                   1,314, 285. 63

            Total amount appropriated to June 30, 1937--------------                                                               4, 834, 991.24

         Fiscal year ending June 30                            1933                1934                1935               1936                    1937


Cost of new work . ------........        ---------------------------
                                              __                                            ____....          __...$2, 069, 817.24        $2, 059, 756. 43
Cost of maintenance------------------------------------------------                                               ---------------------------
Total expended---   .___----     ___--------  _-- -- __----------
                                        _ ___-------                                                               1,303,479.00 2,217,226.61
Allotted--.......----                               .......
                                                 ------------         ...
                                                              -----------                        $5,000,000         -165, 008.76

Balance unexpended July 1, 1936            ____ ________ $3,531,512.24
Gross amount expended _____________________ $2, 224, 671. 55
Less reimbursements collected-------- $7,144.94
Less receipts from sales                          -                                   300. 00
                                                                                                                7, 444.94
                                                                                                                                   2, 217, 226. 61
     Balance unexpended June 30, 1937___ ___________---1, 314, 285. 63
Amount covered by uncompleted contracts-------------------- 1, 315, 945. 33

            Balance available June 30, 1937_______________________                                                                      -- 1, 659. 70
Accounts receivable June 30, 1937____________________________                                                                                1, 659. 70

CONSOLIDATED COST AND FINANCIAL SUMMARY FOR GREAT LAKES TO                                                                       HUDSON RIVER
                             WATERWAY, N. Y.

Cost of new work to June 30, 1937___________________________                                                                     $5, 968, 802. 29
Cost of maintenance to June 30, 1937--------------
      Total cost of permanent work to June 30, 1937       _                                                                        5, 968, 802. 29
Undistributed costs June 30, 1937 ____________________________                                                                          3, 968. 58

      Net total cost to June 30, 1937______________________-    -5, 972, 770.87
Plus accounts receivable June 30, 1937                       __       6, 896.37

     Gross total costs to June 30, 1937______________________                                                                      5, 979, 667.24
Minus accounts payable June 30, 1937_______________________                                                                        1, 518, 433. 51
     Net total expenditures                                                                                                        4, 461, 233. 73
Unexpended balance June 30, 1937____________________________                                                                       5, 373, 757. 51
            Total amount appropriated to June 30, 1937_____________                                                                9, 834, 991.24

         Fiscal year ending June 30                            1933                1934                1935               1936                    1937


Cost of new work..------------------- ----------- ---- -------                                  -----------        $2, 069, 817. 24      $3, 898,985. 05
Cost of maintenance.... -------                  ------------
                                        ------------                                      ------------                                  -----------

             ............-----------------
Total expended-----                                                ------------........                                , 303, 479. 00      3, 157, 754. 73
Allotted-------------------------------------------$5,                                                 000,000      4, 834, 991.24      .............


Balance unexpended                        July        1, 1936__________                                                          $8, 531, 512. 24
Gross amount expended-----------------------$3,173,961.35
Less-
    Reimbursements collected--------$15, 906.62
     Receipts from sales--------------   300. 00
                                                                                                               I9fWi       Rl
                                                                                                                                   3,157, 754. 73
            Balance unexpended June 30, 1937_________________-___                                                                  5, 373, 757. 51
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                       221
Amount covered by uncompleted contracts        ------------   -    $5, 329, 868.80

     Balance available June 30, 1937________ ____--------43,               888. 71
Accounts receivable June 30, 1937______________------------6,              896. 37

     Unobligated balance available June 30, 1937                        50, 785.08
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-___ -        _______-_-----------           5, 000, 000. 00

      Balance available for fiscal year 1938 -------------          5, 050, 785.08
Amount (estimated) required to be appropriated for completion
  of existing   project 1_______________________-                  12, 165, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work 1 --               -       ---   --    5, 000, 000. 00
1 Exclusive of available funds.

          38. NARROWS OF LAKE CHAMPLAIN, N. Y. AND VT.

   Location.-This waterway is the southern end of Lake Champlain,
37 miles long, between Whitehall and Crown Point, N. Y. The por-
tion included in the project extends from Whitehall, N. Y., at the
southern extremity of the lake, northerly to Benson Landing, Vt.,
a distance of 131/2 statute miles. (See U. S. Lake Survey Chart No.
174.)
   Previous projects.-Adopted by River and Harbor Acts of July 4,
1836, March 3, 1837, July 7, 1838, August 5, 1886, July 13, 1892, and
March 3, 1899. The total cost and expenditures were $134,140.35-
$115,000 for new work and $19,140.35 for maintenance. For further
details, see page 256, Annual Report for 1932.
   Existing project.-This provides for a channel extending from
Whitehall, N. Y., at the head of Lake Champlain, to Benson Land-
ing, to be 12 feet deep at low lake level and of a general width of
200 feet on the bottom, and the installation of fender booms at Putts
Rock, Putts Leap, Narrows near Dresden, Pulpit Point, and Cedar
Mountain. The reference plane of the low lake level is 92.5 feet
above mean sea level at Sandy Hook, N. J. The length of the section
included in the project for improvement is about 131/2 statute miles.
The usual annual variation of the lake level is from 4 to 5 feet, and
the extreme variation varies from 0.6 foot below up to 8.8 feet above
the low lake level.
   The estimate of cost for new work, revised in 1928, is $1,196,000,
exclusive of amounts expended on previous projects. The latest
 (1918) approved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. No. 1387, 62d Cong., 3d sess.). The latest
published map is in the project document.
   Terminal facilities.-The only terminal facilities which serve the
improvement are located in Whitehall Harbor and consist of three
timber wharves, aggregating 4,200 feet in length. The State of New
York has constructed a barge-canal terminal at Whitehall, just south
of the terminal of the canal, which has been equipped with a 15-ton
hand-operated derrick and a storehouse.
   Operations and results during fiscal year.-The fender booms at
the Elbow (Putts Leap) and opposite the Delaware & Hudson Rail-
road Co.'s trestle were repaired at a cost of $31.83, and the Fort
Montgomery gage was maintained at a cost of $412.74, a total of
$444.57, all for maintenance. The expenditures were $583.13.
222        REPORT OE CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Condition at end of fiscal year.-The project is about 47 percent
completed. A channel 12 feet deep at low lake level and least width
of 150 feet has been excavated throughout the length of the improve-
ment, except at the Elbow, where it is but 110 feet wide. Fender
booms have been placed at the Elbow (Putts Leap) and opposite the
Delaware & Hudson Railroad Co.'s coal trestle, but they are now
in poor condition and need extensive repairs; none now appear to
be needed at the Narrows near Dresden, Pulpit Point, and Cedar
Mountain. The controlling depths at low lake level on June 30,
1937, through the reach included in the project, were as follows:

                               Locality                              Depth        Width


                                                                      Feet         Feet
Whitehall to the Elbow___                                                    10            75
At the Elbow    ___   -_-_                                                   12           110
From the Elbow to Benson Landing_-                             --            12           150



   The work remaining to be done to complete the project consists
in increasing the width of the channel throughout its project length
from the widths given in the above table to the project width of 200
feet by dredging and rock removal.
   The total cost of the existing project up to June 30, 1937, was
$600,362.55-$566,811.14 for new work and $33,551.41 for mainte-
nance. The total expenditures were $600,327.13.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $564.81, will be applied as follows:
Accounts payable June 30, 1937_ __ _ __ _ _ __             _         __           $35. 42
Maintenance:
      Repair by hired labor fender booms at the Elbow and opposite
       the Delaware & Hudson Railroad trestle during the working
        seasons                              ___ _                 124. 39
      Operate Fort Montgomery gage (July 1937-June 1938)-     -    405. 00
        Total--                                                              -    564.81
   S is proposed not to do any new work in the channel for the
present, as it appears to meet the needs of existing commerce. Exten-
sive shoaling, which is a serious menace to navigation, has occurred
in the channel between the northern terminus of the Barge Canal
at Whitehall, N. Y., and the Elbow. The Fort Montgomery gage
should be operated and the fender booms at the Elbow and opposite
the Delaware & Hudson Railroad trestle should be repaired during
the fiscal year.      Therefore the sum of $41,000 can be profitably ex-
pended during the fiscal year ending June 30, 1939, as follows:
Maintenance :
   Repair and care of fender booms during working seasons-_---                      $,80
      Operate Fort Montgomery gage_ _______       __________-_        _               320
      Complete by June 30, 1939, under contract, the removal of shoals
        which have formed in the channel between the northern ter-
        minus of the Barge Canal at Whitehall, N. Y., and the Elbow---. 40, 000
          T otal-.. .. .. ... -                     --
                                          ------...-.-   -- - - - - - - - - - 41. 0 C(
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                      223
                                       Cost and financial summary

Cost of new work to June 30, 1937___________-------------------                                        $681, 811.14
Cost of maintenance to June 30, 1937- .-------------------------                                         52, 691.76

     Total cost of permanent work to June 30, 1937__--                                                   7------502.90
                                                                                                       -734,
Minus accounts payable June 30, 1937 ______------- ------------                                                  35.42

     Net total expenditures---------------------                                                        734, 467. 48
Unexpended balance June 30, 1937_-------------------------                                ---             -564. 81

         Total amount appropriated to June 30, 1937---------                                            735, 032. 29

         Fiscal year ending June 30                   1933         1934       1935              1936          1937


Cost ofnew work ..---------------------------------
Cost of maintenance------ -----------------           $182. 46     $341. 82   $367. 38     $1,221. 76          $44, 57
Total expended--------------------------               167. 73     340.99      364. 64      1,066. 08           583. 13
Allotted ----------------- ----------------            481. 04     951. 25     800.00           800.00---


Balance unexpended July 1, 1936--------------------------------                                          $1, 147. 94
Gross amount expended--___-___    ----------------------                                                     583. 13
      Balance unexpended June 30, 1937-__----- ---                                          __          --    564.81
                                       ----------
Outstanding liabilities June 30, 1937 _--_--___-                                         _____                 35. 42

         Balance available June 30, 1937_
                                        -----                          _______-___-__                        529. 39
Amount (estimated) required to be appropriated for completion of
   existing project 1 _-------                               ---                                       629,
                                                                                                        6---- 200. 00
Amount that can be profitably expended in fiscal year ending June
S0, 1939 for maintenance 1___________________________________                                           41, 000. 00
  1 Exclusive of available funds.

                                 39. BURLINGTON HARBOR, VT.

   Location.-This harbor, about 100 acres in extent, is located in a
half-moon-shaped indentation in the eastern shore of Lake Cham-
plain, about 40 statute miles south of the international boundary line,
70 statute miles north of the southern end or head of the lake, and 20
statute miles southeast of the harbor at Plattsburg, N. Y. (See U. S.
Lake Survey Chart No. 172.)
   Existing project.-This provides for an irregular-shaped break-
water 6,000 feet long located about 1,000 feet from the shore and
practically parallel with it, to be built of stone-filled timber cribs,
capped with large stone or concrete. The completed breakwater is to
be in two sections, the northerly 500 feet being separated from the
southerly 5,500 feet by a gap 200 feet wide for the purpose of safety
in entering the harbor during storms. The reference plane of low
lake level is 92.5 feet above mean sea level at Sandy Hook, N. J. The
level of the lake has varied from 0.6 foot below up to 8.8 feet above
low lake level, but the usual annual variation is 4 to 5 feet.
   The estimate of cost for new work, revised in 1928, was $1,095,000.
The latest (1928) approved estimate for annual cost of maintenance
is $8,000.

          20196---37-pt. 1-           15
224      ::REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The existing project was authorized by the following river and
harbor acts: The act of July 4, 1836, provided for the first 1,000 feet
of the breakwater (H. Doc. 131, 23d Cong., 1st sess.) ; act of July
12, 1866, provided for a 1,500-foot extension (H. Doc. 56, 39th Cong.,
2d sess., and Annual Report for 1886, pp. 17 and 179); act of
March 3, 1875, provided for a 2,000-foot extension (Annual Report
for 1874, p. 274); and in 1886 a plan was adopted for an extension
southerly of 1,000 feet and northerly 500 feet (Annual Report for
1887, p. 2407). The latest published map is in the Annual Report for
1897, page 3298.
   Terminal facilities.-The terminal facilities which serve the im-
provement consist of 20 wharves, aggregating 15,790 feet in length.
The existing terminals appear to be sufficient for the present needs of
commerce.
   Operations and results during fiscal year.-Under a contract for
repairs to the superstructure of the breakwater, work was commenced
July 20, 1936, and completed September 10, 1936. A total of 70
linear feet of superstructure was repaired at a cost of $13,875.55,
for maintenance.
   By the use of hired labor and rented plant, repairs to the timber
substructure of the breakwater were commenced August 24, 1936,
and suspended December 6, 1936. The cost of this work was
$6,785.14, for maintenance.
   The total cost of all work was $20,660.69, for maintenance. The
expenditures amounted to $20,390.60.
   Condition at end of fiscal year.-The project has been regarded as
practically completed since 1890; part of the breakwater originally
proposed was not built, the work completed being considered suffi-
cient for the needs of navigation. A breakwater has been built ii
two sections, 364 feet and 3,793 feet in length, respectively, separated
by a gap of 200 feet. The stone superstructure near the southern
end of the southern section of the breakwater has been displaced by
wave action and the failure of the timbers in the tops of the wooden
cribs. The ontrolling depth in June 1928 was about 8.5 feet at low
lake level at the wharves, increasing considerably toward the break'
water.
   The distinction between new work and maintenance was not made
in the early reports, hence it is impossible to separate the costs prior
to July 1, 1886. The total cost under the existing project amounted
to $903,722.77; since June 30, 1886, the cost of maintenance amounted
to $197,308.66, leaving $706,414.11 as the cost of new work, including
maintenance prior to July 1, 1886. The total expenditures amounted
to $903,452.68.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the fiscal year, together with an
allotment of $15,000 in July 1937, a total of $22,484.94, will be
applied as follows:
Accounts payable June 30, 1937_--------------------------------$408. 89
Maintenance:
    Complete by May 31, 1938, under a contract to be entered into,
      the repair of 70 linear feet of breakwater_______-_-_--- ___-- 14, 000. 00
      Make repairs to substructure of the breakwater by use of rented
       plant and hired labor during the working seasons (July 1937-
       June 1938) ---------------------                             -    8, 076. 05
          Total ------------                 _-_- --       -    -       22, 484. 94
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                             225

  The work of rebuilding the southern arms of the breakwater
should be continued. Therefore, the sum of $50,000 can be profit-
ably expended making repairs to the breakwater during the fiscal
year ending June 30, 1939.
                                      Cost and financial summary

Cost of new work to June 30, 1937-----------------------------                                           $706, 414. 11
Cost of maintenance to June 30, 1937---------------------------                                           197, 308. 66

      Total cost of permanent work to June 30, 1937---------                                              903, 722. 77
Plus accounts receivable June 30, 1937--------------------- ------                                             138. 80

     Gross total costs to June 30, 1937--------------------------903, 861. 57
Minus accounts payable June 30, 1937______                            408.89

     Net total expenditures -----------------------------------                                           903, 452. 68
Unexpended balance June 30, 1937_-_ ___1--------------------                                                7, 346. 14

          Total amount appropriated to June 30, 1937---------                                             910, 798. 82


         Fiscal year ending June 30                  1933          1934          1935             1936               1937


Cost of new work....------------------------     ---------                                                  -----
Cost of maintenance-....------------------------------------------             $1,968.21          $295.05           $20,660.69
Total expended---      -----------------       --------------- --------         1,968.21           295.05           20, 390. 60
Allotted-----------   -----------------------       -$20. 84    $5, 000,00     15, 000. 00 ------------             10,000. 00



Balance unexpended July 1, 1933-------------------------------                                            $17, 736. 74
Amount allotted from War Department Appropriation Act approved
   May 15, 1936---------------------------------------                                       --             10, 000.00

Amount to be accounted for             __-------------------------------------                              27, 736. 74
Gross amount expended-----------------------------                $20, 532. 42
Less reimbursements collected_-----____-      ___---------               141. 82
                                                                                                            20, 390. 60

      Balance unexpended June 30, 1937 __.__      ______________                                              7, 346. 14
Outstanding liabilities June 30, 1937----------------------------                                                408. 89
     Balance available June 30, 1937 ---------------------------                                              6, 937. 25
Accounts receivable June 30, 1937--- -----------------------------                                               138. 80
Unobligated balance available June 30, 1937---------------------                                              7, 076. 05
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------------                                             15, 000. 00
         Balance available for fiscal year 1938_-__ -                                   -_______
                                                                                           -- __ 22, 076. 05
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -          50, 000. 00
1Exclusive of available funds.

   40. EXAMINATIONS,                 SURVEYS, AND CONTINGENCIES                               (GENERAL)

  The cost of work during the fiscal year amounted to $177,815.88.
The expenditures were $174,036.85. The balance unexpended, in-
cluding accounts receivable, at the end of the fiscal year, together with
an allotment of $75,000 made in July 1937, a total of $127,881.77,
226                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

will be applied as needed during the fiscal year 1938 to payment of
expenses incurred under this heading. The additional sum of
$150,000 can be profitably expended during the fiscal year ending
June 30, 1939.
                                                    Cost and financial summary

,Cost      of new work to June 30, 1937_
,Cost of maintenance      to June 30, 1937------------------------- $640, 559. 69
       Total cost of permanent work to June 30, 1937--___________                                                       640, 559. 69
:Plus accounts receivable June 30, 1937----___ ----- ---    _____                                                             14. 30
      Gross total costs to June 30, 1937...                    6___________________
                                                               640, 573. 99
Minus accounts payable June 30, 1937 -------------------------
                                            _____________       11, 726. 22
     Net total expenditures___ _____________________           628, 847. 77
Unexpended balance June 30, 1937______      -___-__ -__________ 52, 867. 47
             Total amount appropriated to June 30, 1937---------------                                                  681, 715. 24


            Fiscal year ending June 30                              1933           1934           1935           1936           1937

Cost of new work-------------------------..---------
Cost of maintenance---------------------- $55, 837. 57                          $37, 417.72    $48, 699.94    $87,803.44     $177, 815. 88
Total expended---------------------------                         59,971.83      39, 714.56     46, 674.23     82, 740.18     174,036.85
Allotted---...........-----...........-------------------------   74, 701. 95    64, 577. 57    75, 435. 72    74,000. 00     160, 000. 00


Balance unexpended July 1, 1936_                                                                                        $66, 904. 32
Amounted allotted from War Department Appropriation Act ap-
proved May 15, 1936 ------------------------------------                                                               160, 000. 00

      Amount to be accounted for___ ______________________                                                              226, 904. 32
Gross amount expended_____-----     -----           1--- 737. 25
                                                 - $183,
Less reimbursements collected _______-____      -      9, 700. 40
                                                                                                                        174, 036. 85

      Balance unexpended June 30, 1937___ __-----______-- ___                                                               52, 867. 47
Outstanding liabilities June 30, 1937------------------------                                                               13, 874. 22

     Balance available June 30, 1937_ _______-_____-_______                                                                 38, 993. 25
Accounts receivable June 30, 1937_-_______       -    -___
                                                _____________                                                                    14. 30

     Unobligated balance available June 30, 1937------__--- ___                                                             39, 007. 55
Amount allotted from War Department Civil Appropriations Act,
approved July 19, 1937_________-------------------                                                                         75, 000. 00

             Balance available for fiscal year 1938--___---__                                       ____-----           114, 007. 55

Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance     ___----------------------------                                                         150, 000. 00
1Exclusive of available funds.
          RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                          227
41. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                      [Commercial statistics for these projects are given in pt. 2 of report]

                                                                 For last    Cost and expenditures to               Esti-
                                                                  full re-         June 30, 1937                   mated
                      Name of project                            port see                                         amount
                                                                 Annual                                           required
                                                                 Report       New work               Mainte-      to com-
                                                                   for-                               nance         plete


  1.   Larchmont Harbor, N. Y.-------------------------   1916                      $76, 064. 85       $211. 42      (2)
2.    Manhasset Bay, N. Y.3---------                     1--2.._..
                                                          1932                                                   4 $63, 000
3.    Huntington Harbor, N. Y.1---------------------     1936                      51, 989.   06    47, 024. 13     (2)
4.    Port Jefferson Harbor, N. Y.1--------------------1932                      171, 426.    71    10,125. 44   5 152, 700
5.    Browns Creek, N. Y.1__________________________     1936                      33, 976.   03    62, 862. 63      51, 000
6.    Jamaica Bay, N. Y.1---------------------------1934                      4, 307, 771.    72    55, 264. 96 7, 577, 500
7.    Sheepshead Bay, N. Y.------------------------      1931                      33, 827.   59     3, 342. 81     (2)
8.    Saugerties Harbor, N. Y.1----------------------- 1936                        81,904.    91 6 85, 094. 28       (2)
9.    Plattsburg Harbor, N. Y.1----------------------1931                        198, 415.    13    36, 591. 47      (2)
10.    Port Henry Harbor, N. Y.1-                         1931                    7 69, 406.   46     1, 252. 75       2, 000
11.    Otter Creek, Vt.-__________________                1932                      60, 253.   50     5, 246. 50      13, 500
12.    Rouses Point, Lake Champlain, Vt.1-1895                                      98, 467.   55 ------------       (2)


  1 Condition of improvement adequate for commerce.
  2 Completed.
  3 Awaiting local cooperation.
  4 In addition $50,000 is to be contributed by local interests.
  5 In addition $57,000 is to be contributed by local interests.
  6 Revoked fiscal year 1937, $1,199.36.
  7 Exclusive of $10,000 expended from contributed fund.

       42. PLANT ALLOTMENT FOR FIRST NEW YORK, N. Y., DISTRICT

                                     Cost and financial summary
Undistributed costs June 30, 1937-------------------------- $2, 600,320. 67
Plus accounts receivable June 30, 1937__ __-  ______--------268, 806. 77

            Gross total costs to June 30, 1937 ----------------------                                     2, 869, 127. 44
                                     _________
Minus accounts payable June 30, 1937 --                                         __________                  123, 566. 36

     Net total expenditures_ --------------------------------                                             2, 745, 561. 08
Unexpended balance June 30, 1937 ---------------------      -                                                282, 948. 30
           Total amount appropriated to June 30, 1937------------                                         3, 028, 509. 38

        Fiscal year ending June 30             1933           1934           1935                  1936           1937


Total expended             ___          _ _------------_________
                                                             _______   $2, 713, 660. 37 -$354, 108. 81          $386, 009. 52
Allotted-------------------------------------                           3,134, 292.15       -522, 402. 50        416, 619. 73


Balance unexpended July 1, 1936                             _____________________                          $252, 338. 09
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936__-_____________________________  _                                                     455, 864. 16
           Amount to be accounted for ________._________                                           -_________
                                                                                                           708, 202. 25
Deductions on account of revocation of allotment----------------                                               39, 244. 43
      Net amount to be accounted for_______________________                                                 668, 957. 82
Gross amount expended_____________________ _ $2, 383, 989. 50
Less-
    Reimbursements collected-- $1, 815, 879. 29
    Receipts from sales_----____-   182, 100. 69
                                                 1, 997, 979. 98
                                                                                                            386, 009. 52
           Balance unexpended June 30, 1937_ __-______________                                              282, 948. 30
228      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937-------------------------             $453, 053. 10
      Balance available June 30, 1937------------------      -- 170,104.80
Accounts receivable June 30, 1937---------------------------    268, 806. 77
      Unobligated balance available June 30, 1037--------------              98, 701.97
              43. LAMOILLE RIVER, VT., FLOOD CONTROL

   Location.-The Lamoille River rises in northwest Vermont and
flows in a westerly direction to enter Lake Champlain about 10 miles
above Burlington. (See U. S. Geological Survey maps for Milton,
Mount Mansfield, and Hyde Park quadrangles.)
   Existing project.-This provides for channel improvement of the
Lamoille River by reconstruction of Hardwick Dam, excavation at
Johnson Gorge, and bank revetment at 12 places. The estimated
cost of new work, revised in 1937, is $76,330. The estimated cost of
land and damages is $4,770.
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936. (See H. Doc. No. 145, 72d Cong., 1st sess.,
which contains the latest published maps.)
  Local cooperation.-The conditions of cooperation under which
this project was authorized are stated on page 6. The proposed re-
construction of Hardwick Dam is not desired by local authorities nor
will they provide the necessary local cooperation. The Secretary of
War accepted as satisfactory the assurances of the Governor and
chairman, Board of Public Works, State of Vermont, of compliance
with the conditions of local cooperation for the proposed bank revet-
ment of the Lamoille River and the proposed channel excavation at
Johnson Gorge on October 29, 1936, and June 16, 1937, respectively.
  Operation and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done under
the existing project by the Federal Government, nor have there been
any costs or expenditures made thereunder. Local interests have
completed the work of bank revetment at 8 of the 12 localities in-
cluded under this project without cost to the United States.
  Proposed operations.-There are no funds available for this proj-
ect at the end of the fiscal year.
  An allotment of $26,330, to be made during August 1937 from
regular funds, will be applied to the completion by June 30, 1938,
under contract to be entered into for new work, of about 57 percent
of the excavation and rock removal for the enlargement of the chan-
nal in Lamoille River at Johnson Gorge (Ithiel Falls).
  An allotment of $50,000, to be made during August 1937 from
Emergency Relief funds, will be applied as follows:
New work:
   Complete by June 30, 1938, under contract to be entered into,
     about 43 percent of the excavation and rock removal for the en-
     largement of the channel in Lamoille River at Johnson Gorge
      (Ithiel Falls)    ----------------------------------------- $20,000
   Complete by June 30, 1938, under contract to be entered into, bank
     revetment at 4 localities on the Lamoille River by removal of
     existing stone cribs, excavation, and placing of rock-----------30, 000
       Total---------------,------------              -   -       ------         50, 000
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                          229
  This work will result in the completion of the Johnson Gorge im-
provement and the bank revetment. The completed works will be
maintained by local interests.
  No construction operations are proposed for the reconstruction of
Hardwick Dam, as local authorities have given evidence that the
project is not desired and that the required local cooperation will not
be provided. Therefore, no funds will be required during the fiscal
year ending June 30, 1939.
                                 Cost and financial summary
Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937
Net total expenditures__________
      Total amount appropriated to June 30, 1937       ______  __
Amount allotted from War Department Appropriation Act approved
  Apr. 8, 1935------------------------------------------------    $29, 000.00
Deductions on account of revocation of allotment ____--______-_ 29, 000. 00

Amount allotted during August 19371 ____________-____-_________-__                          76, 330.00
Amount available for fiscal year 1938 --------------------------- 76, 330. 00
1$26,330 regular funds and $50,000 Emergency Relief funds.

                   44. WINOOSKI RIVER, VT., FLOOD CONTROL

  Location.-The Winooski River rises in the northeastern part of
Vermont and flows westerly into Lake Champlain about 2 miles
north of Burlington, Vt. It lies wholly within the State and has a
drainage area of about 1,080 square miles and a length of about 90
miles. (See U. S. Geological Survey maps covering Burlington,
Camels Hump, Lincoln Mountain, Montpelier, and Barre quad-
rangles.)
  Existing project.-This provides for the construction of three
earth-filled dams and appurtenant works, consisting of flood reser-
voirs, spillways, and outlet works at East Barre on the Jail Branch,
at Wrightsville on the North Branch, and above Waterbury on the
Waterbury River; and for channel enlargement and improvement
of the Winooski River at Middlesex Gorge and where needed along
the river length of about 15 miles from Middlesex to Montpelier,
Vt., including the replacement of an old timber dam at Montpelier
by a concrete dam with tainter gates. Data concerning the dams are
as follows:

                                             Miles above
                                                mouth           Drain-   Maxi-    Over- Percent
No.        Dam             Tributary                              age    mum        all   com-    Capae-
                                              Main     Tribu-    area    height   length pleted    ity
                                             stream     tary

                                                                Square                            Acre.
                                                                 miles    Feet     Feet           feet
   1   East Barre....   Jail Branch-......     67.9       3.9       38       55    1, 410   100    11, 800
   2   Wrightsville_.   North Branch.....      60.5       4.5       70       95    1, 560   100    21.000
  3    Waterbury-....   Waterbury River _      44. 6      2.6      109      155    2, 000    60    62, 000
230     REPORT OF,CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimate of cost for new work, made in 1935, is $6,378,180.
There is no estimate of the annual cost of maintenance since the com-
pleted works will become the property of the State of Vermont and
will not be maintained by the Federal Government.
   The existing project was authorized by the Director, Emergency
Conservation Work, on June 2, 1933, and consists of a part of the
project described in House Document No. 785, Seventy-first Congress,
third session. Work on this project is being done by the Civilian
Conservation Corps under the Director, Emergency Conservation
Work. The engineering supervision of the project is performed by
the Chief of Engineers, United States Army. For latest published
map see House Document No. 785, Seventy-first Congress, third
session.
   Local cooperation.-The project is being carried out subject to the
condition that the State of Vermont or other local interests will pro-
vide the necessary rights-of-way or easements for structures, borrow
pits, spoil disposal, and camps and cantonments, assume responsibility
for any damages which may result, and maintain and operate the
completed works. The State of Vermont, by act of legislature ap-
proved July 19, 1933, created the State Board of Public Works, which
was authorized to cooperate with the Federal Government in carry-
ing out the project, to provide the necessary lands, easements, and
rights-of-way, and to manage, control, and maintain the completed
works.
    Terminal facilities.-None involved.
    Operations and results during fiscal year.-With Emergency Con-
servation and Emergency Relief funds allotted for Emergency
Conservation Work, operations were continued at the Waterbury Dam
by use of Civilian Conservation Corps personnel and necessary plant.
The concrete tower for the emergency sluice gate was completed in
part and erection of the sluice gate begun. Work accomplished dur-
ing the fiscal year in the construction of the Waterbury Dam in-
cluded: The placing of 1,015,217 cubic yards of earth fill, 117,082
cubic yards of rock fill, 3,847 cubic yards of concrete, 94,026 pounds
of steel, and 25,942 square yards of riprap; excavation of 104,801
cubic yards of earth and 3,316 cubic yards of rock; building of 5 miles
of construction roads; and clearing of 410.5 acres of reservoir area.
The cost of this work was $853,493.95 (exclusive of Civilian Conserva-
tion Corps costs), for new work. The expenditures were $1,048,768.44.
    Condition at end of fiscal year.-The project as a whole is about 80
percent completed. The East Barre and Wrightsville Dams and the
Montpelier Tainter-gate Dam are all completed. Channel work below
Montpelier is about 88 percent completed, and the Waterbury Dam 60
percent completed.
    Work remaining to be done to complete the project involves a lim-
ited amount of rock excavation in the main Winooski River below
Montpelier; and on the Waterbury Dam, the placing of somewhat less
than half of the earth fill, erection of the operating houses for the:
emergency gate and outlet valves, and completion of the spillway
including erection of the tainter gates.
    Total cost of the existing project to June 30, 1937, was $3,721,655.78
 (exclusive of Civilian Conservation Corps costs), all for new work.
The total expenditures were $3,874,605.94.
         RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                231
  Proposed operations.-The balance unexpended, including accounts
receivable, at the end of the fiscal year, together with allotments to
be made during the fiscal year 1938, a total of $932,922.06, will be
applied as follows:
Accounts payable June 30, 1937_____________________________ $76, 005. 18
New work: Continue with Civilian Conservation Corps personnel
  and necessary plant, operations on Waterbury Dam, including
  earth fill, construction of spillway, spillway gates, and gate tower_ 856, 916. 88
           Total ---------------------------------------------------                                               932, 922. 06
  This work should be carried to completion as soon as practicable.
The completed works will be maintained by local interests. There-
fore, no funds will be required for maintenance. The sum of $634,000
can be profitably expended for new work during the fiscal year ending
June 30, 1939, to complete (October 1938) the Waterbury Dam and
the channel improvement from Middlesex to Montpelier. This work
will result in the completion of the project.
                                       Cost and financial summary
                                     EMERGENCY       CONSERVATION               FUNDS

Cost of new work to June 30, 1937____________________________ $3, 721, 655. 78
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937_ ........ _                                              3, 721, 655. 78
Undistributed costs June 30, 1937---------------------------_                                                   228, 926. 74

      Net total cost to June 30, 1937__------  _____________                                                 3,950, 582. 52
Plus accounts receivable June 30, 1937----------------                                                               28. 60

      Gross total costs to June 30, 1937 _____-----             950, 611. 12
                                                        -___---3,
Minus accounts payable June 30, 1937_______-- _____________-
                                                    -            76, 005. 18

     Net total expenditures ----------------------------                                                     3, 874, 605. 94
Unexpended balance June 30, 1937------ __-------------------                                                    236, 001.88

           Total amount appropriated to June 30, 1937________----__                                          4, 110, 607. 82

    Fiscal year ending June 30              1933           1934                   1935               1936               1937


Cost of new work...----------------
                                 _____                  $770, 628.63 $1, 047067.98              $1,050,465. 22       1 $853,493. 95
Cost of maintenance-------..     -    -------------- -------------- -------------- -------------- -----------...---
Total expended-----__-------------------                 706,496.49           1,053, 735. 98     1, 065, 605.03      1,048, 768. 44

Allotted_.---------------------
llotted901,                    --                           000. 0           1,257,180.00       1,323,000.00          629, 427. 82
                                                                          -         ,

   1 After deducting $248,217.16 plant carried in feature costs of fiscal year 1936 and trans-
ferred to undistributed assets in 1937.
Balance unexpended July 1, 1936-------------------------------                                                    $655, 342. 50
Amount allotted from Emergency Relief Appropri-
ation Act, approved June 22, 1936 -_____------$954, 000. 00
Amount allotted from First Deficiency Appropria-
tion Act, approved Feb. 9, 1937--------    ____ 444, 240. 00
                                                                                                              1, 398, 240. 00

     Amount to be accounted for-__________-....__________                                                    2,053, 582. 50
Deductions on account of revocation of allotments------ __                                                     768, 812. 18
      Net amount to be accounted for--
                                     ........                                            ----               - 1,284, 770. 32
Gross amount expended,-----       ----------                                                                  1,048, 768. 44

            Balance unexpended June 30, 1937                          -                                            236, 001. 88
232         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937-                                      $128, 422. 06
     Balance available June 30, 1937 __________ -________-                  107, 579.82
Accounts receivable June 30, 1937_11 ---  1--1______ 1____1__               1     28. 60
        Unobligated balance available June 30, 1937          ------------    107, 608. 42
Amount (estimated) required to be appropriated for completion
  of existing project ___            ---------------   ---------             634, 000. 00
Amount that can be profitably expended in fiscal year ending
                                   - -
June 30, 1939, for new work 2____________________                           634, 000. 00
2   Exclusive of available funds.

45. OTTER CREEK AT RUTLAND AND PROCTOR, VT., FLOOD CONTROL
  Location.-Otter Creek rises in the Green Mountains of Vermont
and flows in a northwesterly direction about 97 miles, entering Lake
Champlain 19 miles south of Burlington, Vt. (See U. S. Geological
Survey maps for Rutland and Castleton quadrangles.)
  Existing project.-This provides for channel improvement by the
construction of dikes in the vicinity of Rutland at an estimated cost
of $49,500, and for channel excavation and dam reconstruction in
the vicinity of Proctor, at an estimated cost of $22,500. The project
was authorized in the Flood Control Act approved June 22, 1936
(see H. Doc. No. 144, 72d Cong., 1st sess., which contains the latest
published map).
  Local cooperation.-The conditions of cooperation under which
this project was authorized are stated on page 6. Local authorities
have declined to provide the required cooperation for the proposed
channel improvement at Rutland.
   Condition at end of fiscal year.-No work has been done under the
existing project nor have any expenditures been made thereunder.
  Proposed operations.-There are no funds available for this proj-
ect at the end of the fiscal year. Local authorities have declined to
provide the required local cooperation for the proposed improve-
ment of channel at Rutland, Vt. It is expected that the local co-
operation required for the proposed channel at Proctor, Vt., will be
complied with during the fiscal year. The sum of $30,000 can,
therefore, be profitably expended, under contract, during the fiscal
year 1939 for completion of the proposed channel improvement at
Proctor, Vt.
                              Cost and financial summary
Total amount appropriated to June 30, 1937-             -- --
Amount allotted from War Department Appropriation Act, ap-
  proved June 22, 1936-------------------------------------- $49, 000. 00
Deductions on account of revocation of allotment________________ 49, (00. 00
Gross amount expended                                                308. 86
Less reimbursements collected-----------------------------------     306. 86
Amount (estimated) required to be appropriated for completion
of existing project                          ___________                    7------______________
                                                                             72, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work----------------------------------                30; 000. 00
        46. HOOSIC RIVER, MASS., VT., AND N. Y., FLOOD CONTROL
  For report on this project see Annual Report for 1936, p. 230. No
funds are available and no work is proposed for the fiscal years 1938
or 1939.
     RIVERS AND HARBORS-FIRST       NEW YORK, N. Y., DISTRICT    233
             47. WALLKILL RIVER, N. Y., FLOOD CONTROL

   Location.-This river has its source in Lake Mohawk in the region
adjacent to Sparta Mountain in northern New Jersey, about 39 miles
northwest of the Battery, New York City. It flows in a generally
northeasterly direction to its junction with Rondout Creek about 3
miles below Rosendale, N. Y. Rondout Creek empties into the Hud-
son from the west at Kingston, about 89 miles north of the Battery,
New York City, and 55 miles south of Albany, N. Y. The streams
have a total drainage area of 1,198 square miles. (See United States
geological map quadrangles Franklin Furnace, N. J., Port Jervis,
Goshen, Ellenville, Newburgh, Rosendale, and Rhinebeck, N. Y.
Also State of New Jersey Atlas Sheet No. 22.)
   Existing project.-This provides for improving the Wallkill River
by cut-offs and channel improvement as follows:
    (a) The removal of channel obstructions at the rapids in the 7-
mile reach from Phillipsburg to 11/2 miles above Pellets Island
Mountain, to increase the channel capacity in this reach to 5,000
second-feet.
    (b) The excavation of a straight channel from 11/2 miles above
Pellets Island Mountain for about 41/2 miles upstream to the mouth
of Pochuck Creek.
   The length of the section under improvement is about 111/2 miles.
   The estimated cost of new work, revised in 1935, is $1,030,000.
There is no estimate of the annual cost of maintenance, since the
completed work will become the property of the Wallkill Valley
Drainage Improvement District, under the sanction of the State of
New York.
   The existing project was authorized by the Director, Emergency
Conservation Work, on May 7, 1935.
   Work on this project prior to April 1, 1937, was done by the
Civilian Conservation Corps under the Director, Emergency Con-
servation Work. The remainder of the work is to be completed
under contract. The engineering supervision of the project is per-
formed by the Chief of Engineers, United States Army.
   For the latest published map see House Document No. 704,
Seventy-first Congress, third session.
   Local cooperation.- This project was authorized subject to the
condition that the State of New York, acting as agent for the Wall-
kill Valley Drainage Improvement District, furnish without cost
to the United States all lands, easements, and rights-of-way; main-
tain, operate, and control the completed works without cost to the
Federal Government; assume the cost of highway relocation, in-
cluding bridges and culverts; and save the United States free from
any claims for damages involved in the prosecution of the work.
Under an agreement dated May 15, 1935, between the Chief of
Engineers and the New York State Water Power and Control Com-
mission, the latter agreed to comply with the conditions of local
cooperation.
   Terminal facilities.-None involved.
   Operations and results during fiscal year.-Operations were con-
tinued by use of Civilian Conservation Corps personnel and neces-
234       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

sary plant, using Emergency Conservation and Emergency Relief
funds, all for emergency conservation work. The work by the Civil-
ian Conservation Corps on this project was discontinued March 31,
1937 (work to be completed under contract). During the fiscal year
the following work was accomplished. Rights-of-way were cleared
of timber and brush, and necessary construction roads were com-
pleted. Excavation of the improved channel was continued, and
channel side slopes were graded and paved with stone. Extensive
quarry operations were conducted to furnish rock for the latter pur-
pose. Work done during the fiscal year included clearing 18,000
square yards of rights-of-way, 951,000 cubic yards of earth excava-
tion, 588,000 cubic yards of earth in levee construction, and 65,000
square yards of riprap paving. Surveys were conducted preparatory
to completing this project under contract. The cost of this work was
$573,534.01 (exclusive of Civilian Conservation Corps costs), for new
work, and the expenditures were $572,451.95, all from Emergency
Conservation funds.
   Condition at end of fiscal year.-The project is about 90 percent
completed. Work remaining to be done to complete this project is
as follows: Excavation of about 13,000 lineal feet of cut-off channel,
construction of gravel embankment and levees along cut-off channel,
and provision of facilities for drainage behind levees. The total
cost of the existing project to June 30, 1937; with Emergency Con-
servation funds was $1,051,018.58, exclusive of Civilian Conservation
Corps costs, for new work. The total expenditures were $1,048,554.72.
   Proposed operations.--The balance of Emergency Conservation
funds unexpended at the end of the fiscal year, together with an
allotment of $2,700 made in July 1937, a total of $9,603, will be ap-
plied as follows:
Accounts payable June 30, 1937                   ----- ___            $2, 463. 86
                                                                    _----------__
New work:
    Complete operations on this project by the Civilian Conserva-
      tion Corps personnel and necessary plant _______ -____    __      1, 390. 29
    Complete removal and disposal, under contract to be entered
      into, of buildings and facilities of the Civilian Conservation
      Corps camps on this project------------------                     2, 700. 00
    Balance remaining ------------------------ --------------           3, 048. 85
      Total -----------------------                       ---                 9, 603. 00
  The balance unexpended of Emergency Relief funds at the end
of the fiscal year, amounting to $341,000, will be applied as follows:
Accounts payable June 30, 1937------___----              --      --- _______     $593.89
New work: Complete by Nov. 30, 1938, under contract in force, the
  enlargement and rectification of the Wallkill River Channel from
  about 7,000 feet above Pellets Island Mountain Bridge to near
  the mouth of Pochuck Creek         _______--------------- ----          -  340, 406.11

      Total -------------------------------------------                     341, 000. 00
  This work will complete the project. The completed work will be
maintained by local interests. Therefore no funds can be profitably
expended during the fiscal year ending June 30, 1939.
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                                    235
                                              Cost and financial summary

                                                EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937_   __---------------------                                                                   -----------
Cost of maintenance to June 30, 1937--------------------------                                                                   -----------

      Total cost of permanent work to June 30, 1937__-        ----
Undistributed costs June 30, 1937__--------------------------                                                                            $593. 89

      Net total cost to June 30, 1937----------------------_____                                                                           593. 89
Net total expenditures---------------------------  -------------------------
Unexpended balance June 30, 1937-----------------------------                                                                        341, 000. 00
      Total amount appropriated to June 30, 1937______________--                                                                      341, 000. 00


         Fiscal year ending June 30                                1933              1934               1935              1936              1937


Cost of new work----             -----------------------                                              ---------------------------
Cost of maintenance------------------------
Total expended         ....----------------     ----------------                   ---        ------------------------------
Allotted_------------------------------------------------------------------------------                                                     $341,000



Amount allotted from Emergency Relief Appropriation Act ap-
proved April 8, 1935---------------------------------------- $341,000. 00
Balance unexpended June 30, 1937_         ---------                                                                                   341, 000. 00
Amount covered by uncompleted contracts----------------------                                                                         191, 000. 00
            Balance available June 30, 1937 ------------------                                                                        150, 000. 00
                                         EMERGENCY                 CONSERVATION               FUNDS


Cost of new work to June 30, 1937____________--______________ $1, 051, 018. 58
Cost of maintenance to June 30, 1937__

      Total cost of permanent work to June 30, 1937-----------  1, 051, 018. 58
Minus accounts payable June 30, 1937--- -----------------------      2, 463. 86
     Net total expenditures---------------------------------                                                                    1, 048, 554. 72
Unexpended balance June 30, 1937 ----------------------------                                                                        6, 903. 00 V
          Total amount appropriated to June 30, 1937_                                                                           1______--__
                                                                                                                               1, 055, 457. 72            9

          Fiscal year ending June 30                               1933              1934              1935               1936              1937




Total expended.....      ---------------------------------------------                                     75.00       476,027.77         572, 451.95
Allotted.                                              .---------------------------------------      15,000.       1   756, 500.          283,957.72



Balance unexpended July 1, 1936 ------------- __-___                                                   -       -                     $295, 397.23
Amount allotted from Emergency Relief Appropria-
tion Act, approved June 22, 1936           _..   ___$547, 000. 00           -                                                   ,   607    "''    0 .0
                                                                                                                                                     '
Amount allotted from First Deficiency Appropria-
tion Act, fiscal year 1936, approved Feb. 9, 1937__    5, 000. 00 f
                                                                                                                                      552, 000. 00
          Amount to be accounted for---                                                                                               847, 397. 23



                 :92                          "k-7      (e         o:   /L~ }t4~c~r_1                          -uA:P                   t ,\L.
236          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Deductions on account of revocation of allotment ------                                   ____              Y$268,     042.28
      Net amount to be accounted for---    ..--------- __                                           __-            579, 354. 95
Gross amount expended- ___-___-____-----___-__                                                                     572, 451. 95
      Balance unexpended June 30, 1937-----------------------                                                        6, 903.00
Outstanding liabilities June 30, 1937_ ___-.-_____-_-____-                                                           3, 854. 15
         Balance available June 30, 1937 ----------                                                   __             3, 048. 85

       CONSOLIDATED COST AND FINANCIAL SUMMARY FOR WAILLKILL RIVER, N. Y.

'Cost of new work to June 30, 1937______________________                                                     $1, 051, 018. 58
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937----------1, 051, 018. 58
Undistributed costs June 30, 1937__ ___________                      593. 89
        Net total cost to June 30, 1937                                                                       1_____-________--__-
                                                                                                              1, 051, 612. 47
Minus accounts payable June 30, 1937-------------------------                                                      3, 057.75

        Net total expenditures----------------------------------                                              1, 048, 554. 72
Unexpended balance June 30, 1937_-__--                                        -347,
                                                                   -- -________---                                     903. 00
         Total amount appropriated to June 30, 1937 __--____                                                  1, 396, 457. 72

        Fiscal year ending June 30                  1933                  1934          1935               1936         1937


Cost of new work          ....            ............----------------------..       $5, 064. 63   $472, 419. 94     $573, 534. 01
Cost of maintenance--------------------------------                 ------------ ---------- ------------ -----
Total expended----------------------------------                        ----------       75.00      476, 027. 77      572, 451.95
Allotted-----------   -              --       --------------- ------....... 15, 000. 00 756, 500.00                   624, 957. 72


Balance unexpended July 1, 1936 -___-      -   -
Amount allotted from Emergency Relief Appropria-
                                                   -    -    -____-  ____--                                       $295, 397. 23
tion Act approved Apr. 8, 1935______-
                                  ....               $341,000.00      ___--
Amount allotted from Emergency Relief Appropria-
  tion Act approved June 22, 1936 --------            547, 000. 00
                                                    -__
Amount alloted from First Deficiency Appropriation
  Act, fiscal year 1936, Approved Feb. 9, 1937          5, 000. 00        ------
                                                                                                                   893, 000. 00
     Amount to be accounted for                ---__--__-
                                                       __--                                        ___--  1, 188, 397. 23
Deductions on account of revocation of allotment___ -------                                         __-268,       042.28
      Net amount to be accounted for-------------------------                                                      920, 354.95
Gross amount expended------------------------------------                                                          572, 451. 95
      Balance unexpended June 30, 1937-----------------------347, 903. 00
Outstanding liabilities June 30, 1937__________ -  -    $3, 854. 15
Amount covered by uncompleted contracts-        -____- 191, 000.00
                                                                    194, 854.15
        Balance available June 30, 1937_                                         -___                  _-_________--
                                                                                                             153, 048.85

48. SUSQUEHANNA RIVER HEADWATERS, WEST BRANCH OF THE
      DELAWARE RIVER, AND UPPER FINGER LAKES BASINS IN NEW
     YORK AND PENNSYLVANIA, FLOOD CONTROL

   Location.-The Susquehanna River, the West Branch of the Dela-
ware, and the Upper Finger Lakes Basins include a drainage area of
over 10,000 square miles in northern Pennsylvania and central New
     RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT           237

York. The Susquehanna and Delaware Rivers rise in Lake Otsego,
Cooperstown, N. Y., and in the westerly slopes of the Catskill Moun-
tains, respectively, and flow in a general southerly direction to form
part of the North Atlantic drainage system. The Upper Finger Lakes
Basins drain in a northerly direction into Lake Ontario and the St.
Lawrence River system. (See U. S. Geological Survey index maps of
New York State and Pennsylvania.)
   Existing project.-This provides for construction of detention res-
ervoirs and related flood-control works for protection of Bingham-
ton, Hornell, Corning, and other towns in New York and Pennsyl-
vania at an estimated construction cost of $27,154,000; estimated costs
of lands and damages, $5,930,000; and was authorized by the Flood
Control Act approved June 22, 1936.
   Local cooperation.-The conditions of cooperation under which this
project was authorized are stated on page 6. The Secretary of War,
on December 15, 1936, accepted as satisfactory the assurances of the
superintendent of Public Works, State of New York, to comply with
the conditions of local cooperation for the proposed channel im-
provements at Hornell, Lisle, Avoca, Painted Post, and Oxford,
N. Y., and for proposed dams on the Canisteo and Otselic Rivers
above Arkport and Whitney Point, respectively. Permission to enter
those properties on which surveys and foundation investigations are
necessary is being obtained by the State as the need therefor arises,
and those properties required for construction activities are being
acquired by the State as the operations progress.
   Operations and results during fiscal year-Emergency Relief
funds.-Surveys, foundation explorations, and engineering studies
were carried on in connection with possible reservoir and channel
improvement sites. Construction of channel improvements at Avoca,
'Hornell,  Lisle, Oxford, and Painted Post, N. Y., were initiated. Op-
erations included 480,000 cubic yards of excavation and stripping
22,000 cubic yards of earth fill and clearing of 37 acres.
   The total cost of work with Emergency Relief funds was $764,-
'889.27, for new work. The expenditures were $687,432.87.
   Emergency Conservation funds.-Preliminary operations were ini-
tiated on the Whitney Point, Addison, and Arkport Dam by Civil-
ian Conservation Corps personnel.
   The total cost of work with Emergency Conservation funds was
$390,502.49, for new work. The expenditures were $541,759.74.
   The total cost of work, all funds, during the fiscal year was
 $1,155,391.76, all for new work. The total expenditures were $1,229,-
192.61.
   Conditionat end of fiscal year.-The entire project is approximately
4 percent completed. The percentage of work completed by Emer-
gency Relief funds for the channel improvement projects are: Avoca,
25; Hornell, 10; Lisle, 35; Oxford, 15; and Painted Post, 20.
   At the end of the fiscal year the total cost of the project, all for
new work, was $1,155,391.76, of which $764,889.27 was from Emer-
gency Relief funds and $390,502.49 from Emergency Conservation
Work funds. Total expenditures were $1,229,192.61, of which $687,-
432.87 were from Emergency Relief funds and $541,759.74 from
Emergency Conservation Work funds.
238       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-Allotmeits of regular funds in the amount
of $1,681,000 during the fiscal year 1938 will be applied as follows:
New work:
   Continue to June 30, 1938, under hired labor, surveys, founda-
     tion investigations, and engineering studies in conjunction with
     similar operations with relief funds _____________ __ ____       $450, 000
   Complete by June 30, 1938, under contract, construction of levees
     and channel improvement on Cohocton River and Salmon
     Creek at Avoca, N. Y., in conjunction with similar operations
     with relief funds        _                                         70, 00)
   Complete by June 30, 1938, under contract, construction of levees
     and channel improvement on Canisteo River, above Erie R. R.,
     and Canacadea Creek at Hornell, N. Y., in conjunction with
     similar operations with relief funds__--_______-_-_____-___  _    140, 000
   Complete by Dec. 31, 1937, under hired labor, construction of
     levees and channel improvement on Tioughnioga River at Lisle,
     N. Y., in conjunction with similar operations with relief funds_   40, 000
   Complete by June 30, 1938, under contract, construction of levees
     and channel improvement on Chenango River at Oxford, N. Y.,
     in conjunction with similar operations with relief funds__-- _     60, 000
   Complete by June 30, 1938, under .hired labor, construction of
     levees and channel improvement on the Conhocton and Che-
     mung Rivers at Painted Post, N. Y., in conjunction with similar
     operations with relief funds       __    __ __           ______    80, 000
   Complete by June 30, 1938, under contract, construction of levees
     and channel improvement on the Susquehanna River at Bing-
     hamton, N. Y., in conjunction with similar operations with
     relief funds ------------
                          __________         ___      _________        110, 000
   Complete by June 30, 1938, under contract, construction of spill-
     way and conduit and commence embankment construction for
     detention reservoir no. 8 on the Canisteo River near Arkport,
     N. Y., in conjunction with similar operations with relief funds_  130, 000
   Commence by June 30, 1938, under contract, construction of spill-
     way, conduit, and embankment for detention reservoir no. 18
      on the Otselic River at Whitney Point, N. Y., in conjunction
     with similar operations with relief funds__________________       601, 000

              Total                         --------------                        1, 681,000

  The balance unexpended, including accounts receivable at the end
of the fiscal year from the Emergency Relief appropriations of
1936-37, amounting to $680,909.14, together with allotments in the
amount of $2,249,000 made during the fiscal year 1938, a total of
$2,929,909.14 will be applied, as follows:
Accounts payable June 30,    1937--_---_----___-__-______________                $406, 847. 43
New work:
    Continue to June 30,     1938, under hired labor,
      surveys, foundation    investigations, and engi-
      neering studies, in    conjunction with similar
        operations with regular funds-       ---             -   $424, 061.71
      Complete by June 30, 1938, under contract, con-
        struction of levees and channel improvement
        of Cohocton River and Salmon Creek at
        Avoca, N. Y., in conjunction with similar opera-
        tions with regular funds -_ -_____________                135, 000. 00
      Complete by June 30, 1938, under hired labor,
        construction of levees and channel improve-
        ment on the Canisteo River, below the Erie
        Railroad, at Hornell, N. Y., in conjunction
        with similar operations with regular funds__ _               480, 000
      Complete by Dec. 31, 1937, under hired labor, con-
        struction of levees and channel improvement
        on Tioughnioga River at Lisle, N. Y., in con-
        junction with similar operations with regular
        funds---------------------------------------                  40, 000
     RIVERS AND HARBORS--FIRST NEW YORK, N. Y., DISTRICT                                 239
New work-Continued.
   Complete by June 30, 1938, under hired labor,
    construction of levees and channel improve-
    ment on Chenango River at Oxford, N. Y., in
    conjunction with similar operations with regu-
     lar funds--__---------------------------------                $130, 000
   Complete by June 30. 1938, under hired labor,
    construction of levees and channel improve-
    ment on the Conhocton and Chemung Rivers at
    Painted Post, N. Y., in conjunction- with similar
    operations with regular funds______--_----                      120, 000
   Complete by June 30, 1938, under contract, con-
     struction of levees and channel improvement on
    the Susquehanna River at Binghamton, N. Y.,
    in conjunction with similar operations with
      regular   funds-------------------------------                640, 000
    Complete by June 30, 1938, under hired labor, and
     contract, the construction of spillway and con-
     duit and commence the embankment construc-
     tion for detention reservoir no. 8, on the Canis-
     teo River near Arkport, N. Y., in conjunction
     with similar operations with regular funds__                   545, 000
    Complete by June 30, 1938, under hired labor,
     clearing of site for detention reservoir no. 18
     on the Otselic River at Whitney Point, N. Y.,
     in,. conjunction with similar operations with
     regular funds-------------------------------                     9,000
                                                                               $2,523 061. 71

          Total---------------------------------------------                   2, 929, 909. 14
   The balance unexpended, including accounts receivable, at the end
of the fiscal year from Emergency Conservation Work funds, amount-
ing to $34,485.58 less accounts payable amounting to $7,848.99, is
available for revocation. An allotment of $4,500 made during the fis-
cal year 193'8 will be applied to the maintenance and liquidation of
Civilian Conservation Corps camps.
   The above operations will be complete at Avoca, Lisle, Oxford. and
Painted Post projects. The remaining work will be carried to com-
pletion as soon as practicable. The completed works will be main-
tained by local interests. Therefore, no funds are required for
maintenance.
   It is estimated that the sum of $8,000,000 can be profitably expended
for new work during the fiscal year ending June 30, 1939: $4,185,000
for the initiation of construction operations on additional dams, and
$3,815,000 for continuing of proposed work as follows: Hornell Chan-
nel improvement, $265,000; Binghamton Channel improvement,
$1,650,000; dan no. 8, $900,000; dam no. 18, $1,000,000.
                                      Cost and financial summary

                                        EMERGENCY RELIEF FUNDS

Cost of new or to June 30, 1937-----____-__________   _____                     $764, 889. 27
Cost of mai    nce to June 30, 1937_
      Total'   of permanent work to June 30, 1937_-_______                       764, 889. 27
Undistribute  sts June 30, 1937.__..__-__                                        104., 049. 02
      Net total cost to June 30, 1937__________________                           68, 938. 29
                                                                                 8_____
Plus accounts receivable June 30, 1937_      ____________                        225, 342. 01
      Gross total costs to June 30, 1937--                                     1, 094, 280.30
      20196-37--pt. 1--16
240          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937----                                              -_____----_                . $406, 847.43

     Net total expenditures -- ---                                                                                       432. 87
                                                                                                                   6---------__-_
                                                                                                                  1687,
Unexpended balance June 30, 1937--------- -----------                                                     --       455, 567.13

         Total amount appropriated to June 30, 1937__--_                                         __-__-1, 143, 000. 00


        Fiscal year ending June 30                  1933                1934              1935            1936         1937


Cost of new work...........--------------------          -------------------------------------                        $764, 889. 27
Cost of maintenance            -------------
                                          ----------------       ----
                                                                ----------------------                --------------
Total expended-------------...........---          ------------ ------------- ---------- ------------     687, 432.87
Allotted--------------            --    -------------------------------------------                                  1, 143, 000. 00



Amount allotted from Emergency Relief Act approved June 22,
1936 --------- -------------------------------------------   $1, 893, 000. 00
Deductions on account of revocation of allotment  __------  -     750, 000. 00
      Net amount to be accounted for __.___- -      -- ______--                                                  1, 143,000.00
Gross amount expended------------------------$1, 522. 075. 81
Less reimbursements collected _----------------834,      642. 94
                                                                                                                   687, 432.87
      Balance unexpended June 30, 1937---------------------_                                                       455, 567.13
Outstanding liabilities June 30, 1937____________ __         __1___                                                459, 647. 43
      Balance available June 30, 1937 -------------------------                                                     -4, 080.30
Accounts receivable June 30, 1937__                                                                                225, 342.01
     Unobligated balance available June 30, 1937_ ---                                            -        -____ 221, 261. 71
Amount allotted during fiscal year 19381--- --------- ---                                            --       3, 930, 000. 00
         Balance available for fiscal year 1938_-______ -____                                              _     4, 151, 261. 71
Amount (estimated) required to be appropriated for completion
of existing project - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 22, 880, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work'              ---     ___--_              -           -_____________   8, 000, 000. 00
  1Includes
   2Exclusive$1.681,000   regular
              of available funds.
                                         funds.


                                   EMERGENCY CONSERVATION FUNDS

Cost of new work to June 30, 1937______                                 ___-___________                            390, 502. 49
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937_...                                                            390, 502.49
Undistributed costs June 30, 1937----                                                                      -        58, 960. 92
                                                                                                                   1-------
      Net total cost to June 30, 1937______________________       549, 463.41
Plus accounts receivable June 30, 1937---------------------------      145. 32
      Gross total costs to June 30, 1937-_________                                     -- ____---                  549, 608. 73
Minus accounts payable June 30, 1937                                                  -               4......--,,-
                                                                                                               7, 848. 99
     Net total expenditures ___..____                                    ----                                      541, 759. 74
Unexpended balance June 30, 1937__-- ---                              ______--            __ _____                  34, 340.26
         Total amount appropriated to June 30, 1937 ________------576, 100. 00
          RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                 241

            Fiscal year ending June 30                                 1933    1934      1935             1936             1937


Cost of new work--------------------------..........................                         ------------ $390, 502. 49
                                                                                      ..---------...................
                                                                     ------------............
Cost of maintenance-...-------------------- ---------- ----------------------- ------------ ------------
                     --......        ----     ----- -----
                                          ........---------
Total expended..........................-------..             -----------
                                                            ---                                                          541, 759.
                                                                                                                                 74
Allotted-------------------------------------------------------------------                                              576, 100. 00



Amount allotted from Emergency Relief Appropria-
tion Act approved Apr. 8, 1935____________          $464, 700.00
Amount allotted from Emergency Relief Appropri-
ation Act approved June 22, 1936_____________         78, 000. 00
Amount allotted from First Deficiency Appropriation
Act, fiscal year 1936, approved Feb. 9, 1937-------   78, 400. 00
                                                                                                                    $621, 100. 00
Amount to be accounted for-__-----------------______                                                      ---        621, 100. 00
                                             ---------------
Deductions on account of decrease of allotment__                                                                      45, 000. 00
      Net amount to be accounted for..__.___-                                                -
                                                                                         -_____- -                   576, 100.00
                                     -
Gross amount expended___________-____-        ___                                          -_                        541, 759. 74
      Balance unexpended June 30, 1937 _____------__-                                                                -34, 340.26
Outstanding liabilities June 30, 1937----- ------                                                                      31, 302.94
      Balance available June 30, 1937--------------------------                                                         3, 037. 32
Accounts receivable June 30, 1937 -------------     ---------                                                              145. 32

    Unobligated balance available June 30, 1937___- --- ___-                                                    -       3, 182.64
Amount allotted during fiscal year 1938 ------------ ---------                                                          4,500. 00
                                                     ----
             Balance available for fiscal year 1938_-__                                     -___-               -       7, 682. 64
          CONSOLIDATED COST AND FINANCIAL SUMMARY FOR EMERGENCY RELIEF AND
                                  CONSERVATION FUNDS

Cost of new work to June 30, 1937_________________________ $1, 155, 391. 76
Cost of maintenance to June 30, 1937    _____

       Total cost of permanent work to June 30, 1937 ___ __                                                      1, 155, 391. 76
Undistributed costs June 30, 1937_____________--   ___-____                                                        263, 009. 94
       Net total cost to June 30, 1937__________________--
                                                  --         _                                                      1, 418, 401. 70
Plus accounts receivable June 30, 1937___-- ______________-                                                           225, 487. 33
      Gross total costs to June 30, 1937______________--
                                                 -1__                                                            1, 643, 889. 03
Minus accounts payable June 30, 1937-___---  ___________                                            --             414, 696. 42
      Net total expenditures___
Unexpended balance June 30, 1937------
                                                                                                                 1,
                                                                                                            229, 192.61
                                                                                                         1_______________________
                                                                              ----------- __         -__- 489, 907. 39
              Total amount appropriated to June 30, 1937_-------------- 1, 719, 100. 00
   1 Includes $280.041.23 E. R. funds-Assistance for educational, professional and clerical
persons 1936-1937.


            Fiscal year ending June 30                                1933    1934      1935          1936                 1937


  ost of new work----------..                     -----------. --------------------------------                        $1, 155,391. 76
Cost of maintenance----                     --      ------------ ------------ ------------ -------
Total expended-....--------------------------------                                  .....-------- ----
                                                                                                    ------------ 1, 229, 192. 61
Allotted..-----......
                  .- -- -------    ----------
                           . ------..
                               --.....                                                         ,--. ,.-
                                                                                               ....  --. 1,719, 100. 00
242         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from Emergency Relief Appro-
priation Act, approved Apr. 8, 1935                464, 700. 00
                                               ___ $---------
Amount allotted from Emergency Relief Appro-
priation Act, approved June 22, 1936 ----------- 1,971,000. 00
Amount allotted from First Deficiency Appro-
  priation Act, fiscal year 1936, approved Feb.
9, 1937---------------------------------------       78, 400. 00
                                                                                                                                    2, 514, 100. 00
      Amount to be accounted for----------      -                                                                                   2, 514, 100. 00
Deductions on account of decrease and revocation of allotments_                                                                        795, 000.00
      Net amount to be accounted for____                                                                                            1, 719, 100. 00
                                                                                                                                    1_____---__
Gross amount expended___--    _-------------     _' $2, 063, 835. 55
Less reimbursements collected_----------       -        834, 642. 94
                                                                                                                                    1, 229, 192. 61
    " Balace unexpended June 30, 1937 _____     _______---____                                                                         489, 907. 39
Outstanding liabilities June 30, 1937---------------------------                                                                       490, 950. 37
     Balance available June 30, 1937--__-__--__-   ___------                                                                            -- 1, 042. 98
Accounts receivable June 30, 1937  ----------------------------                                                                         225, 487. 33
Unobligated balance available June 30, 1937______________                                                                               224, 444. 35
Amount allotted during fiscal year 19381-------_____________                                                                         3, 934, 500. 00
      Balance available for fiscal year 1938____--------------                                                                      4, 158, 944. 35

Amount (estimated) required to be appropriated for completion
of existing project 2------------                                                                                                       22, 880, 000
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for new work 2_                                                                                                     8, 000, 000. 00
  1Includes $1,681,000 regular funds.
  2 Exclusive of available funds.

        Status of reports called for by river and harbor act and committee
                                     resolutions

                                                      Date trans-                                                                        Recommenda-
       Location             Authorization act          mitted to                          Document no.                                       tion
                                                       Congress

Albany to Schenectady,    River and Harbor                                         -----------------------
N. Y., waterway via       Act, Aug. 26, 1937.
Hudson and Mohawk
Rivers.
Bronx Kills and Harlem      -do-----------------
                          ---...
  River, N. Y.
Champlain Lake, Vt.,      River and Harbor          Mar.          1,1937           ----------------------- I Unfavorable.
in vicinity of Milton      Act, Aug. 30, 1935.
and South Hero.
East River, N. Y-......   Rivers and Harbors
                            Committee resolu-
                            tion, Nov. 27, 1935.
East Rockaway Inlet to    River and Harbor          Mar. 25, 1937                  House, 181, 75th Cong.,                               Favorable.
  Great Peconic Bay,        Act, Aug. 3C,1935.                                      1st sess.
  N. Y., Long Island
  Intracoastal Water-
  way.
Fire Island Inlet, N. Y_ _ Rivers and Harbors       May 13, 1937                   Rivers and Harbors                                       Do.
                             Committee resolu-                                         Committee, 33, 75th
                            tion, Apr. 28, 1936.                                     Cong., 1st sess.
Flushing Bay and Creek Rivers and Harbors           May 26,1937                    Rivers and Harbors                                       Do.
  N. Y.                      Committee resolu-                                         Committee, 35, 75th
                             tion, Oct. 2, 1936.                                       Cong., 1st sess.
Great     Lakes-Atlantic Rivers and Harbors                                      . ... . . . . . . .        - -   - - -       - -
  Tidewaters Deep            Committee resolu-
  Waterway (Lake St.        tion, Jan. 16, 1935.
  Francis to Hudson
  River at Albany).
Hashamomuck (Arsha- River and Harbor                Dec. 12,1936                    .................                     .     -        Unfavorable.
  momaque) Creek,           Act, Aug. 30, 1935.
  Long Island, N. Y.
Hoosic River, N. Y. and Senate committee res-      - - - - - - - - - - - - - - .-,-- - - - - - - - - - - - - - - - - - - - -.
  Vt.                        olution, July 29,
                             1937.
Hoosic River, N. Y., Flood Control Com-
  Vt., and Mass.             mittee resolution,
                             Feb. 3, 1937.
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                                                    243
        Status     of   reports          called     for       by   river       and   harbor                act           and       committee
                                                  resolutions-Continued

                                                                     Date trans-                                                           Recommenda-
        Location                   Authorization act                  mitted to                      Document no.                              tion
                                                                       Congress



Hudson River, N. Y.,          Rivers and Harbors
Albany to Waterford.           Committee resolu-
                                tion, Jan. 27, 1937.
Hudson River and Mo-          Flood Control Com-
hawk River, N. Y.              mittee resolution,
 (protection of Water-          Mar. 19, 1937.
ford, N. Y.).
Hudson River at Ossin-        Rivers and Harbors
ing, N. Y.                     Committee resolu-
                                tion, Jan. 27, 1937.
Hudson River at or near       River and Harbor Act,                 Nov. 19, 1936                                                                   Do.
  Piermont, N. Y., to           Aug. 30. 1935.
  Hackensack River. N.
  J., waterway from.
Huntington Harbor, N.    River and Harbor Act-
  Y.                       Aug. 26, 1937.
Irvington Harbor, N. Y.  River and Harbor Act,                      May        1, 1937     House, 244, 75th Cong.,                             Favorable.
                           Aug. 30, 1935.                                                   1st sess.
Jones Inlet, N. Y  -------
                         Rivers and Harbors                         June 21, 1937                                                              Unfavorable.
                           Committee resolu-
                           tion, Jan. 29, 1934.
Little Neck Bay, N. Y.__ Senate committee reso-                     M ay 12, 1937 I              .        .          .         .....                Do.
                           lution, June 10, 1936.
Montauk Lake Harbor, River and Harbor Act,
  Long Island, N. Y.       Aug. 30, 1935.
Moriches Inlet, Long River and Harbor Act,                          Dec. 17,1936                                                               Unfavorable.
  Island, N. Y.            Aug. 30, 1935.
Newtown Creek, N. Y_ Rivers and Harbors                                                                                                        Favorable.
                                                                    Aug. 27, 1933          Rivers and Harbors                                  Uavorable.
                           Committee resolu-                                                 Committee, 4, 75th
                           tion, Apr. 5, 1935.                                               Cong., 1st sess.
New York Harbor, N. Rivers and Harbors                                                    ........................
  Y.                       Committee resolu-
                           tion, July 31, 1935.
New York Harbor, N. Senate committee reso-                          Aug. 10, 1936          Senate committee                                    Favorable.
  Y., Hudson River         lution, July 31, 1935.                                           print, 75th Cong.,
  Channel,       Ambrose                                                                    1st sess.
  Channel and Anchor-
  age Channel.
New York State Flood Control Act,
  streams,      including   Mar. 3, 1936.
  Esopus Creek, Birch
  Creek, Bushnelville
  Creek, Woodland
  Creek, Warner Bush-
  kill Creek, Beaverkill
  Creek and River, Saw-
kill Creek, Rondout
  Creek, Neversink
  Creek and River,
  Schoharie Creek and
  tributaries, Catskill
  Creek, Delaware
  River, East Branch,
  Willowemoc River,
  and Lackawack River
  (preliminary examina-
  tion for flood control).
Nissequogue River,         River and Harbor Act,
  Long Island, N. Y.        Aug. 30, 1935.
Northport Harbor, N. Y_ River and Harbor Act,
                                    Aug. 26, 1937.
Orowoc Creek, N. Y
Otter Creek, Rutland
                        -__---      _ do...----    --------
                                  Senate committee reso-
County, Vt.                        lution, July 29, 1937.
Rondout Harbor, N. Y_.            River and Harbor Act,
                                    Aug. 26, 1937.
St. Lawrence River at             River and Harbor Act,
  Lake St. Francis to               Aug. 30, 1935.
  Hudson     River at
  Albany via Lake
  Champlain,      d eep
  waterway.
Susquehanna R i v e r,            Flood Control           Act, -..-----.....             I-----------
  Pa., tributaries,                 June 20, 1936.
  sources, and head-
  waters (preliminary
  examination for flood
  control).
Travers Island and Glen       River and Harbor Act,                 Jan. 22, 1937 I-----------.......................                          Unfavorable.
  Island, N. Y., channel       Aug. 30, 1935.
  between.
244       REPORT OF CHIEF OF ENGINEERS, U. S, ARMY, 1937

   IMPROVEMENT OF RIVERS AND HARBORS IN THE
         SECOND NEW YORK, N. Y., DISTRICT
  This district includes Staten Island, N. Y., and the northeastern
part of New Jersey from Newark Bay and its tributaries on the north
to the head of Barnegat Bay at Bayhead, N. J., on the south.
  District engineer: Lt. Col. D. McCoach, Jr., Corps of Engineers,
to July 20, 1936, Maj. H. G. Fairbanks, Corps of Engineers, acting
district engineer since that date.
   Division engineer: Col. E. D. Peek, Corps of Engineers.


                                        IMPROVEMENTS


                                         Page                                        Page
1. Newark Bay, Hackensack and                   10. Washington Canal and South
     Passaic Rivers, N. J_......          244         River, N. J__------------      264
2. New York and New Jersey                      11. Keyport Harbor, N. J____         266
     Channels ----------------            247   12. Shoal Harbor and Compton
3. Raritan River to Arthur Kill                       Creek, N. J_-------------      267
     Cut-off Channel, N. J ----           254   13. Sandy Hook Bay, N. J ..      _   268
4. Elizabeth River, N. J-------           255   14. Shrewsbury River, N. J ..        269
5. Rahway River, N. J_------              257   15. Manasquan River, N. J_  ..       272
6. Woodbridge Creek, N. J ---             258   16. Examinations, surveys, and
7. Lemon Creek, Staten Island,                        contingencies (general) __     275
     N. Y---                      _ _     259   17. Other projects for which no
8. Great Kills, Staten Island,                        estimates are submitted__      276
     N. Y_---------------       _         260   18. Plant allotment-----             276
9. Raritan River, N. J ---------          261

      1. NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, N. J.

   Location.-Newark Bay is an estuary about 1 mile wide between
bulkhead lines and 6 miles long, extending southerly from the con-
fluence of the Hackensack and Passaic Rivers to Staten Island
Sound, thus connecting with the waters of Upper and Lower New
York Bay.
   The Hackensack River rises near Haverstraw, Rockland County,
N. Y., and flows to Newark Bay. It is about 45 miles long.
   The Passaic River rises in the highlands of northeastern New
Jersey. It is about 80 miles long. (See U. S. Coast and Geodetic
Survey Charts Nos. 287 and 369 and U. S. Geological Survey chart
of New York City and vicinity.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, June 10, 1872, June 14, 1880, June 13, 1902, March 2, 1907,
July 25, 1912, March 2, 1919, and September 22, 1922. The total
cost and expenditures were $1,755,321.46 for new work and $442,-
485.44 for maintenance, a total of $2,197,806.90. For further details
see pages 265 and 266 of Annual Report for 1926, and page 301, An-
nual Report for 1929.
   Existing project.-This provides for a channel in Newark Bay 30
feet deep and about 1,800 feet wide at the entrance, including the
removal to a depth of 30 feet of part of the rock area at Bergen
Point, shown on project map as area A (H. Doc. No. 206, 67th Cong.,
2d sess.), narrowing to 400 feet below the Central Railroad of New
Jersey bridge across the bay, and continuing with that width to the
  RIVERS AND HARBORS-SECOND          NEW YORK, N. Y., DISTRICT     245
junction of the Passaic and Hackensack River Channels, a distance
of about 5 miles, with a branch channel 30 feet deep and 400 feet
wide, widened at the turn, to the Port Newark terminal extending
from the main channel as far as the United States pierhead line, a
distance of 1,200 feet; a channel in the Hackensack River 30 feet
deep and 400 feet wide from the upper end of the Newark Bay
Channel to the Central Railroad of New Jersey bridge, about 1.1
miles, thence 30 feet deep and 300 feet wide to a point about 2,000
feet north of the Delaware, Lackawanna & Western Railroad bridge,
2.8 miles, thence 12 feet deep and 200 feet wide to Little Ferry, 10.1
miles, and thence 12 feet deep and 150 feet wide to the New York,
Susquehanna & Western Railroad bridge 21/2 miles, a total distance;
for the Hackensack River of about 161/2 miles; and a channel in the
Passaic River 30 feet deep and 300 feet wide, from Newark Bay to a
point 3,000 feet above the Lincoln Highway Bridge, 2.6 miles; thence
20 feet deep and 300 feet wide to the Nairn Linoleum Works, about
4.4 miles; thence 16 feet deep and 200 feet wide to the Montclair &
Greenwood Lake Railroad bridge, about 1.1 miles; thence 10 feet
deep and 150 feet wide to the Eighth Street Bridge at Passaic, 7.3
miles, a total distance for the Passaic River of 15.4 miles.
   All depths refer to the plane of mean low water. The mean tidal
range in the bay, Hackensack River, and in Passaic River up to the
Montclair & Greenwood Lake Railroad bridge, is about 5 feet; in
the Passaic River at the Gregory Avenue Bridge, Passaic, it is about
4.6 feet. High easterly or westerly winds cause a fluctuation of as
much as 2 feet above or below mean tidal range.
   The estimate of cost for new work, revised in 1936, is $5,604,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $152,000.
   The existing project was adopted by the following river and har-
bor acts: The acts of March 2, 1907, and February 27, 1911, pro-
vided for the 16-foot channel in Passaic River (H. Doc. No. 441,
59th Cong., 2d sess.); act of July 25, 1912, provided for the 20-foot
project in Passaic River (H. Doc. No. 707, 62d Cong., 2d sess.); act
of January 21, 1927, provided for the 10-foot project in Passaic
River (H. Doc. No. 284, 69th Cong., 1st sess.); act of July 3, 1930,
provided for the 30-foot channel in Passaic River (H. Doc. No. 156,
71st Cong., 2d sess.); act of July 25, 1912, provided for the 12-foot
channel in Hackensack River (H. Doc. No. 643, 61st Cong., 2d sess.);
act approved September 22, 1922, provided for the 30-foot channel
in the Hackensack River below the Central Railroad of New Jersey
bridge and the 30-foot channel in Newark Bay (H. Doc.No. 206, 67th
Cong., 2d sess.); and the act of January 21, 1927, provided for the
30-foot channel in Hackensack Riverl above the Central Railroad of
New Jersey bridge (H. Doc. No. 429, 69th Cong., 1st sess.). The
two last-mentioned documents and House Document No. 156, Seventy-
first Congress, second session, contain the latest published maps.
   Local cooperation.-Fully complied with.
   Ternminal facilities.-There are 14 publicly owned wharves, 1 of
which is owned by the Federal Government, and 242 private wharves
and piers. The facilities are considered adequate for existing com-
merce. (For further details see Port Series No. 20, pts. II and III,
Corps of Engineers, except for wharves and piers in the upper Hack-
ensack and Passaic Rivers.)
246      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Operations and results during fiscal year.-A contract for main-
tenance dredging to restore project dimensions in the 20-foot channel
in Passaic River, from its lower end up to Jackson Street, Newark,
N. J., in progress at the beginning of the fiscal year, was continued
and completed on October 26, 1936, at a cost of $155,139.91. Prelim-
inary surveys and expenses by Government plant and hired labor in
connection with proposed work were performed at a cost of $3,364.40
for maintenance. The total cost for the year was $158,504.31, all for
maintenance. The total expenditures were $168,671.22.
    Condition at end of fiscal year.-The existing project, as revised
in 1930, is about 90 percent completed. The 30-foot channels in
Newark Bay and Hackensack and Passaic Rivers are completed; the
Port Newark Terminal Channel is completed; the 12-foot channel in
Hackensack River is completed; the 20-foot channel in Passaic River
is completed to Jackson Street, Newark; the 16-foot channel in
Passaic River is completed; the 10-foot channel in Passaic River
above the Montclair & Greenwood Lake Railroad bridge is completed.
    The controlling mean low water depths on June 30, 1937, were as
follows: Twenty-eight feet in Newark Bay and 30 feet in Port
Newark Terminal Channel; thence 30 feet to a point 2,000 feet above
the Delaware, Lackawanna & Western Railroad bridge; thence 12
feet to the head of the project at the New York, Susquehanna &
Western Railroad Bridge, Hackensack, which is practically the pres-
ent upper limit for commercial-boat navigation; and in the Passaic
River 28 feet to 3,000 feet above Lincoln Highway Bridge; thence 20
feet to Jackson Street Bridge; thence 16 feet to the Erie Railroad
bridge (Newark branch); thence 13 feet to Nairn Linoleum Works
  (Congoleum Co.); thence 12 feet to the Montclair & Greenwood Lake
Railroad Bridge; thence 81/2 feet to 500 feet below Eighth Street;
thence 6 feet to Eighth Street, Passaic. There is some commercial-
boat navigation up to Wall Street, about three-fourths of a mile
above Eighth Street.
   There remains to be done to complete the project completion of the
20-foot channel in Passaic River above Jackson Street, which in-
cludes the removal of a small quantity of rock on the west side of the
channel above the Center Street Bridge, which property owners in
1916 requested be not deepened.
  The costs were $5,003,533.98 for new work and $1,386,180.29 for
maintenance, a total of $6,389,714.27. The total expenditures were
$6,389,712.27.
  Proposed operations.-There was an unexpended balance of $222,-
899.48 on June 30, 1937, of which amount $122,000 was revoked during
July 1937.
   It is proposed to apply the funds unexpended, $100,899.48, as
follows:
Accounts payable June 30, 1937 _--__       __         _-------------         $2. 00
New work: Dredging by contract to widen the channel in Passaic
  River on its westerly side in the vicinity of the Montclair & Green-
  wood Lake R. R. bridge (September to December 1937) ______           100, 897. 48
      Total------------ ---------------------------------------         100, 89. 48
  The additional sum of $123;000 can be profitably expended during
the fiscal year 1939, in maintenance dredging, by contract, in Newark
Bay, Hackensack and Passaic Rivers, where shoaling occurs periodi-
      RIVERS AND HARBORS-SECOND                                               NEW YORK, N. Y., DISTRICT                           247
cally. The funds will be expended during the period September 1938
to June 1939.
                                                        Cost and financial summary
Cost of new work to June 30, 1937____________------------$6, 758, 855. 44
Cost of maintenance to June 30, 1937------------------------ 1, 828, 665. 73

     Total cost of permanent work to June 30, 1937--------                                                           8, 587, 521.17
Minus accounts payable June 30, 1937___________----------                                                                      2. 00

     Net total expenditures----------------------------------8,                                                         587, 519. 17
Unexpended balance June 30', 1987___-----__  -------------------                                                        222, 899. 48

            Total amount appropriated to June 30, 1937_________-----                                                 8, 810, 418. 65

            Fiscal year ending June 30                            1933           1934            1935           1936           1937


Cost of new work                 --------------------         $192, 288. 10
Cost of maintenance--                                    -     104, 484. 14   $34, 629. 42   $165, 814. 55   $13, 064. 09   $158, 504. 31
        Total cost ..----------------------                    296, 772. 24    34, 629. 42    165, 814. 55    13, 064. 09    158, 504. 31
Total expended ...----------------------                       315, 096. 98    34, 847. 62    165, 765. 48     3, 108. 03    168, 671. 22

Allotted----------------------------                           222, 644. 74   295, 851. 53    123, 000. 00   187, 000. 00


Balance unexpended July 1, 1936---------------------                                                 ---------         $405, 070. 70
Deductions on account of revocation of allotment                                                                          3, 500. 00
                                                                                                                         1--------------
      Net amount to be accounted for -------------------------                                                          391, 570. 70
Gross amount expended_____________________________                                                                      168, 671.22
      Balance unexpended June 30, 1937------------------ _                                                              222, 899.48
Outstanding liabilities June 30, 1937________________________-                                                                 2. 00
            Balance available June 30, 1937________________ ____                                                        222, 897. 48
Amount (estimated) required to be appropriated for completion
   of existing project --                                                                                                00, 000. 00
                                                                                                                        6--------------
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance -1- - - - - - - - - - - - - - - - - - - - - - - _                                       123, 000. 00
   1 Exclusive of available funds.

                            2. NEW YORK AND NEW JERSEY CHANNELS

  Location.--These channels extend from deep water northeast of
Sandy Hook, through Lower New York Bay and Raritan Bay, to
Perth Amboy, and thence through Arthur Kill, lower Newark Bay,
and Kill van Kull to deep water in Upper New York Bay. This
route is located approximately along the boundary line between the
States of New York and New Jersey. (See U. S. Coast and Geo-
detic Survey Charts Nos. 285, 286, and 369.)
  Previous projects.-Adopted by River and Harbor Acts of March
3, 1881, September 19, 1890, June 3, 1896, June 23, 1874, March 3,
1875, June 14, 1880, and August 11, 1888. Modified May 15, 1889 and
October 20, 1890, and by acts of June 3, 1896, June 13, 1902, June 25,
1910, March 4, 1913, and September 22, 1922. The cost and expendi-
tures were $12,809,974.72 for new work and $727,042.71 for mainte-
nance, a total of $13,537,017.43.   For further details of previous
projects see p. 1775 of the Annual Report for 1915, and pages 362,
366, and 374 of the Annual Report for 1921.
248      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for a channel through Lower
New York Bay, Raritan Bay, and Staten Island Sound to Upper
New York Bay, the depth to be 37 feet in rock and 35 feet in soft
material throughout, except in Arthur Kill between a point 1,000 feet
north of the mouth of Smiths Creek and a point 1,000 feet south of
Buckwheat Island, where the depth will be 30 feet; the width to be
600 feet across Lower New York Bay and Raritan Bay and in the
Arthur Kill to a point 1,000 feet south of Buckwheat Island, widened
to 800 feet in the vicinities of Seguine Point and Wards Point, re-
spectively, thence 500 to 600 feet wide and passing north of Shooters
Island and protected by a dike on its northern side to the junction of
the channel into Newark Bay; and thence 800 feet wide through Kill
van Kull to Upper New York Bay; with two anchorages 38 feet deep
to accommodate five vessels each, one in the vicinity of Sandy Hook
and one south of Perth Amboy, all with suitable easing at the bends
and junctions. All depths refer to the plane of mean low water. The
mean range of tides varies between 4.7 and 5 feet. Extreme easterly
or westerly winds produce fluctuations of 1 to 3 feet above or below
the mean range.
   The estimate of cost for new work as revised in 1936 is $27,369,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $195,000.
   The project for the anchorage off Perth Amboy, was authorized by
the Public Works Administration September 6, 1933; enlargement of
the channels was authorized May 28, 1935, under the Emergency
Relief Appropriation Act of 1935, and the existing project as a whole-
was adopted by the River and Harbor Act approved August 30,
1.935 (H.Doc. No. 133, 74th Cong., 1st sess.) and (Rivers and Harbors
Committee Doc. No. 17, 71st Cong., 2d sess.). The latest published
maps are printed in the project documents.
   Local cooperation.-Work is subject to the following conditions of
local cooperation which have not been complied with:
   (a) That where the project channel encroaches upon upland property and
extends shoreward of harbor lines, the completion of the encroaching portions
of the project shall be deferred until the necessary rights-of-way for channel
purposes shall have been granted free of cost to the United States; and
  (b) That local interests provide areas of land adjacent to the waterway, free
of cost to the United States, for the disposal of dredged materials, except
where, in the judgment of the Chief of Engineers, no suitable disposal areas
exist.
   Under condition (a), a portion of Buckwheat Island necessary for
channel purposes has been ceded to the United States, and an attempt
is being made to have land donated at other points where the chan-
nel encroaches shoreward of harbor line. Condition (b) is being
complied with.
   Terminal facilities.-There are 11 publicly owned wharves and 271
private wharves and piers, and are considered adequate for existing
commerce. (For further details see Port Series No. 20, parts II and
III, Corps of Engineers.)
   Operations and results during fiscal year-Regular funds.-Pre-
liminary surveys were made during the year prior to letting of con-
tracts for the following work: Dredging for improvement of channel
at Elizabeth, N. J.; dredging from Elizabethport, N. J., to vicinity
of Buckwheat Island; dredging (rock removal) in vicinity of Bergen
  RIVERS AND HARBORS--SECOND NEW YORK, N. Y., DISTRICT              249
Point Light, and dredging (rock removal) in section 7B. Total costs
for surveys were $6,544.43, all for new work. An obstruction (rock)
was removed from section 7 by hired labor at a total cost of $664.78,
all for new work. A contract for dredging to complete the removal
of overburden in section 6 from the channel north of Shooters Island
was commenced on July 30, 1936, and completed on March 6, 1937.
The cost was $631,308.72 for new work.
   A contract for dredging and rock removal in section 7, area 1, in
the northerly half of the channel in the vicinity of Bergen Point
Light, was commenced on August 13, 1936, and was in progress at the
close of the fiscal year. The cost was $556,423.47 for new work.
   A contract for dredging and rock removal in section 7, areas 2 and
3, in the northerly half of the channel in the vicinity of Bergen Point
Light was commenced on August 31, 1936, and was in progress at the
close of the fiscal year. The cost was $560,894.50 for new work.
   A contract for dredging for the removal of overburden in the
northerly half of section 5, extending from a line 1,000 feet below
Buckwheat Island to opposite the easterly coal pier at Elizabethport,
was commenced on March 1, 1937, and was in progress at the close
of the fiscal year. The cost was $383,083.03 for new work.
   Preliminary surveys in connection with repair and extension of
dike north of Shooters Island amounted to $356.47.
   A contract for maintenance repairs to 388 feet of the westerly end
of the dike north of Shooters Island, was commenced on October 1,
1936, and was completed on November 17, 1936. The cost was
$23,070.40 for maintenance.
   A contract for maintenance dredging to restore project dimensions
in the channel south of Shooters Island was commenced on May 19,
1937, and was in progress at the close of the fiscal year. The cost was
$56,049.39 for maintenance.
   The costs during the year from regular funds were $2,138,918.93
for new work and $79,476.26 for maintenance, a total of $2,218,395.19.
The expenditures were $1,954,236.28.
   Emergency Relief funds.-A contract for dredging in section 6,
channel north of Shooters Island, in progress at the beginning of the
fiscal year, was continued and completed on August 13, 1936. The
cost was $42,424.03, all for new work.
   A contract for dredging in section 7A,extending from the easterly
line of Shooters Island to the vicinity of West New Brighton, Staten
Island, N. Y., in progress at the beginning of the fiscal year, was con-
tinued and completed on September 29, 1936. The cost was $183,-
406.13 for new work.
   A contract for dredging in section 7B, extending from the vicinity
of West New Brighton, Staten Island, N. Y., to Upper New York
Bay, in progress at the beginning of the fiscal year, was continued
and completed on December 12, 1936. The cost was $311,314.79, all
for new work.
   Total costs under Emergency Relief funds were $537,144.95, all for
new work. Total expenditures were $783,914.39.
   The total costs for the year, all funds, exclusive of $291.39 con-
tributed funds which were expended for new work, were $2,676,063.88
for new work, and $79,476.26 for maintenance, a total of $2,755,540.14.
The total expenditures, all funds, exclusive of $291.39 contributed
funds, were $2,738,150.67.
250       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Condition at end of fiscal year.-The existing project as modified
by act approved August 30, 1935, is about 10 percent completed.
   The controlling mean low water depth on June 30, 1937, through
the main channels covered by the existing project was 30 feet, except
north of Shooters Island, where the depth was only 21 feet. The old
30-foot channel south of Shooters Island provided for a 30-foot chan-
nel past Shooters Island. The controlling depth in the anchorage
for three ships off Perth Amboy was about 33 feet. Neither of the
38-foot anchorage areas was commenced.
   The entire work under the project remained to be done with the
exception of work accomplished in anchorage off Perth Amboy, the
removal of overburden from 1,000 feet south of Buckwheat Island
to Upper New York Bay and the removal of ledge rock in the vicinity
of Bergen Point Light.
   The total costs for new work, all funds, exclusive of $7,711.82 con-
tributed funds, were $5,004,268.13, of which $2,197,268.13 was from
regular funds, $807,000 from Public Works funds, and $2,000,000 from
Emergency Relief funds, and $172,715.25 for maintenance from regu-
lar funds, making a total of $5,176,983.38. The total expenditures,
all funds, exclusive of $7,711.82 contributed funds, were $4,913.955.90,
of which $2,106,955.90 was from regular funds, $807,000 from Public
Works funds, and $2,000,000 from Emergency Relief funds.
   Proposed operations.-It is proposed to apply the funds unex-
pended and accounts receivable on June 30, 1937, amounting to $583,-
483.27, exclusive of $208.61 contributed funds which will be refunded
to contributor, together with an allotment of $3,236,000 made during
July 1937, less $32,000 revoked during August 1937, a total of
$3,787,483.27, as follows:
Accounts payable June 30, 1937__-------_                 -------     263, 249. 23
New work:
    Dredging and rock removal to complete an existing continuing
      contract in section 7, area 1, in vicinity of Bergen Point
      Light (July 1937 to June 1938)-------------------------- 1, 600, 000. 00
    Dredging and rock removal to complete an existing continuing
      contract in section 7, areas 2 and 3, in vicinity of Bergen
      Point Light (July 1937 to June 1938)                            742, 000. 00
                                                                   1---------------------,
    Dredging to complete an existing contract for removal of over-
      burden and dredgeable shale rock in the northerly half of
      section 5, extending from 1,000 feet south of Buckwheat
      Island to the easterly coal pier at Elizabeth, N. J. (July
      to November 1937) --------------------------------------         73, 000. 00:
Maintenance:
    Dredging under an existing contract to restore project dimen-
      sions in the channel south of Shooters Island (July to
      October 1937) --------------------------------------------       23, 234.04
    Dredging by contract to restore project dimensions where
      shoals occur periodically in the Raritan Bay and Arthur
      Kill Channels (September 1937 to June 1938) --------------       86, 000. 00
       Total-----------------------------------           ----------    3, 787, 483. 27
  The additional sum of $5.118,000 can be profitably expended during
the fiscal year 1939, as follows:
New work:
   Dredging and rock removal by contract in the vicinity of
     Bergen Point (July 1938 to June 1939)    _--__-----------    $2, 500, 000. 00
   Dredging and rock removal by contract in the channel north
     of Shooters Island (July 1938 to June 1939)__ _--------   --  1, 800, 000. 00
   Dredging with U. S. Engineer Department sea-going dredge
     in lower New York Bay (July 1938 to June 1939) -------           700, 000. 00
       RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                                       251
Maintenance: Dredging by contract to restore project dimensions
where shoals occur periodically in the Raritan Bay and Arthur
Kill Channels (September 1938 to June 1939) -----------------                                                         $118, 000. 00
           Total -------------------------------------------------                                                5, 118, 000. 00

                                                 Cost and financial summary
                                        MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, -1937__--------------------------- $15, 814, 242. 85
Cost of maintenance to June 30, 1937-------------------------    -899,    757. 96
      Total cost of permanent.work to June 30, 1937----------                                                    16, 714, 000. 81
Plus accounts receivable June 30, 1937-----------------------                                                             221. 75
      Gross total costs to June 30, 1937----------------------                                                   16, 714, 222. 56
Minus accounts payable June 30, 1937_------------------------                                                        263, 249. 23
     Net total expenditures___------------------------------- 116, 450, 973. 33
Unexpended balance June 30, 1937---------------------------        583, 261. 52
           Total amount appropriated to June 30, 1937------------                                                17, 034, 234. 85

    Fiscal year ending June 30                         1933              1934            1935             1936               1937


Cost of new work..                       ...---------------
                                                       $46, 281.04    $366, 160. 44   $312, 157. 51    $185, 309. 48     $2, 138, 918. 93
Cost of maintenance---
                   .........                   .            210. 09      5, 466. 59     86, 555. 77          159. 20          79, 476. 26
                  ----------------
        Total cost..                                  46, 491. 13      371, 627. 03   398, 713. 28      185, 468. 68      2, 218, 395. 19

Total expended--
               .         ----       ---------        234, 107. 33      329, 049. 49   375, 714. 81      227, 287. 79      1, 954, 236. 28

Allotted_..._   ______...-      .     .....-.      -92,301. 75         616,116. 43     520, 890. 46   2,315, 000. 00       -15   00000


Balance unexpended July 1, 1936---------------------------$2, 552, 497. 80
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936---------------------------------------          685, 000. 00
      Amount to be accounted for--------------------------- 3, 237, 497. 80
Deductions on account of revocation of allotment ------------          00. 000. 00
      Net amount to be accounted for------------------------       2, 537, 497. 80
Gross amount expended-----------------------      $1,987,357. 15
Less reimbursements collected-------- ----------      33, 120. 87
                                                                   1, 954, 236. 28
      Balance unexpended June 30, 1937----------------------          583, 261. 52
Outstanding liabilities June 30, 1937------------     $1, 169. 49
Amount covered by uncompleted contracts -----        452, 785. 19
                                                                      453, 954. 68
      Balance available June 30, 1937------------------------         129, 306. 84
Accounts receivable June 30, 1937-------------------------                 221. 75
      Unobligated balance available June 30, 1937---- --------        129, 528. 59
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937- ---------------------------------       23, 236, 000. 00
      Balance available for fiscal year 1938-------------------    3, 365, 528. 59
Amount (estimated) required to be appropriated for completion
of existing project 3--------------------------------------                                                     18, 950, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: 3- - - -
                         - - - -- - - - - - -- - - - - - - - - - - - -- -      --  --- --
    For new work                                                                                                  5, 000, 000. 00
    For maintenance 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -                       118, 000. 00
       Total 3 ----------------------------------------------                                                     5, 118, 000. 00
1 Includes $807,000 Pultic Works funds.
   2   Includes $32,000 revoked since June 30, 1937.
    SExclusive of available funds.
252            REPORT-OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                           EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937--------               _--       $2, 000, 000.00
Cost of maintenance to June 30, 1937---------------------------------

      Total cost of permanent work to June 30, 1937_ ______--2, 000, 000. 00
      Net total expenditures___---------------   -__-____     2, 000, 000. 00
Total amount appropriated to June 30, 1937 __________________ 2, 000, 000. 00

    Fiscal year ending June 30               1933             1934             1935                1936              1937


Cost of new work-----------.-.-----__ __ --                  --.
                                                             --.... $340.27 $1,462, 514. 78   $537, 144. 95
Cost of maintenance--------------------------         --       - --------------
Total expended...........----------------------------    --------------      , 216,085. 61      783, 914. 39
Allotted         ------------------------------------          2,000,000.00------        --------------

Balance unexpended July 1, 1936_________------------------------------                                         $783, 914. 39 .
Gross amount expended------------- ------------          $794,         23                   699.
Less reimbursements collected__-- __---    ____- __         10, 784. 84
                                                                                                                783, 914. 39

      CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED                                         STATES FUNDS

Cost of new work to June 30, 1937__--------------------------                                             $17, 814, 242. 85
Cost of maintenance to June 30, 1937------------------------                                                   899, 757.96
      Total cost of permanent work to June 30, 1937 -----                                                  18, 714, 000. 81
Plus accounts receivable June 30, 1937-------------------                                                           221. 75
           Gross total costs to June 30, 1937---                           --------------                  18, 714, 222. 56
Minus accounts payable June 30, 1937------------                                            --                 263, 249. 23
     Net total expenditures------------------------ --------                                            18, 450, 973. 33
Unexpended balance June 30, 1937___________--__------                                                       583, 261. 52
     Total amount appropriated to June 30, 1937___________'                                            119, 034, 234. 85

    Fiscal year ending June 30               1933            1934              1935                1936              1937


Cost of new work--...--..-...- ... $46, 281. 04           $366, 160. 44    $312, 497. 78 $1, 647, 824. 26       $2,676,063.88
Cost of maintenance-------------
                      ..........        210. 09              5, 466. 59      86, 555. 77          159. 20           79, 476. 26

      Total cost- . -------------          46, 491. 13     371, 627. 03     399, 053. 55     1, 647, 983. 46     2, 755, 540. 14

Total expended--....--...----------..     234, 107. 33     329, 049. 49     375, 714. 81     1, 443, 373. 40     2, 738, 150. 67

Allotted                   _.----------
                             --------     -92, 301. 75     616, 116. 43   2, 520, 890. 46    2,315, 000. 00       --15, 000. 00


Balance unexpended July 1, 1936_           ---                    $3, 336, 412.19
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936----------------------------------------         685, 000.00
      Amount to be accounted for----------------------------       4, 021, 412. 19
Deductions on account of revocation of allotment-___       ___-       700, 000. 00
      Net amount to be accounted for--------------------------     3, 321, 412. 19
Gross amount expended        ____---$_________ $2, 782, 056. 38
Less reimbursements collected__--- -____              43, 905. 71
                                                                   2, 738, 150. 67
      Balance unexpended June 30, 1937- --                             83, 261. 52
                                                                      5--------------------
Outstanding liabilities June 30, 1937                    ------------
                                                       1, 169. 49
Amount covered by uncompleted contracts-.----        452, 785. 19
                                                                       453, 954. 68
           Balance available June 30, 1937_,_                                                      _           129, 306.84
   SIncludes $807,000 Pubilic ~WorkV
                                   i funds.
   RIVERS AND HARBORS-SECOND                          NEW YORK, N. Y., DISTRICT                              253
Accounts receivable June 30, 1937           -     -            --             -                           $221. 75
     Unobligated balance available June 30, 1937 -------------                                        129, 528. 59
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------     ----           _____                                   3, 236, 000. 00

Balance available for fiscal year 1938__ ---              -----------                         23,     365, 528. 59

Amount (estimated) required to be appropriated for completion
of existing project -------------------------------------                                    18, 950, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work --------------------------------------                                              5, 000, 000. 00
   For maintenance   -------------------------------- -----                                            118, 000. 00

        Total     ----------------------------           ------------                 ---       5, 118, 000. 00
  2 Includes $32,000 revoked since June 30, 1937.
  SExclusive of available funds.

                                    CONTRIBUTED FUNDS

Cost of new work to June 30, 1937__________                 __-____                     ____           $7, 711.82
Cost of maintenance to June 30, 1937__------- ----
       Total cost of permanent work to June 30, 1937----------- --                                       7, 711. 82

Net total expenditures_                     ____-   -     --                                   -   7, 711. 82
                                                                                      -_____- _________
Unexpended balance June 30, 1937---------------------------                                           208. 61
       Total amount contributed to June 30, 1937_______________                                          7, 920. 43

       Fiscal year ending June 30          1933         1934             1935                1936           1937


Cost of new work------------------__------------------------             $339.36        $7,081.07           $291.39
Cost of maintenance-    - -          -------.---------                     --          --------------        ---
Total expended---....------------         ------------------                 339.36         7,081.07         291. 39
Contributed-------------------------.......-------------------10,200.00                       50000       -2,779.57


Balance unexpended July 1, 1936_____________ _____------
                                                      -$3,                                                  279. 57
Deductions on account of amount refunded--   --------------------                                        2, 779. 57
      Net amount to be accounted for_.....        _____
Gross amount expended ___- ---___--------___--291.39
                                                                        __        _----___                 500. 00

        Balance unexpended June 30, 1937------------------------                                           208. 61
   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR NEW YORK AND NEW JERSEY
                                  OHANNELS

Cost of new work to June 30, 1937------------------------                                     $17, 821, 954.67
Cost of maintenance to June 30, 1937----__ ---------
                                                ____   ---                                         899, 757. 96
      Total cost of permanent work to June 30, 1937--------                                    18, 721, 712. 63
Plus accounts receivable June 30, 1937 -------------   ----                                         -221.    75
     Gross total costs to June 30, 1937 _______------                                          18, 721, 934. 38
Minus accounts payable June 30, 1937____________------
                                  193                                                              26,
                                                                                                   263,249.23

     Net total expenditures --          -----      -------                                     18, 458, 685. 15
                                1111----- 111-----
Unexpended balance June 30, 1937-----                                                              583, 470. 13
        Total amount appropriated and contributed to June 30,
                ----------------
          1937___                    ---      --    ---                                       119,    042, 155. 28
  1 Includes $807,000 Public Works funds.
254            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


      Fiscal year ending June 30         1933            1934             1935              1936               1937


Cost of new work--------------         $46, 281. 04   $366, 160. 44    $312, 837. 14 $1, 654, 905. 33     $2. 676, 355. 27
Cost of maintenance-------------..          210. 09      5, 466. 59      86, 555. 77          159. 20          79, 476. 26

        Total cost----------------      46, 491. 13    371, 627. 03     399, 392. 91   1, 655, 064. 53     2, 755, 831. 53

Total expended---------------          234, 107. 33    329, 049. 49     376, 054. 17   1, 450, 454. 47     2, 738,442. 06

Allotted and contributed-...          --92, 301. 75    616,116. 43    2,.531;090.'46   2,315, 5D0. 00       -17, 779.57


Balance unexpended July 1,1936---------     --------                                               $3, 339, 691.76
Amount allotted from War Department Appropriation Act ap-
proved May 15,1936----------------------------------------                                              685, 000.00

      Amount to be accounted for _________---------4,                                                    024, 691.76
Deductions on account of revocation of allotment --.- ____----                                           702, 779. 57

      Net amount to be accounted for-----------------------3,                                            321, 912. 19
Gross amount expended__-____----        __-___ -     _ $2,782, 347. 77
Less reimbursements collected ------------                -_ 43, 905. 71
                                                                                                     2, 738, 442.06

      Balance unexpended June 30, 1937------------                                                       583, 470. 13
Outstanding liabilities June 30, 1937_-111 11--$1,   169. 49
Amount covered by uncompleted contracts---------452, 785. 19
                                                                                                         453, 954. 68

      Balance available June 30, 1937-------------------------                                           129, 515. 45
Accounts receivable June 30, 193__----7 ------------                                                          221. 75

     Unobligated balance available June 30, 1937--                                                     1---------
                                                                                                     -129,   737. 20
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------    -- -------------------                                        3, 236, 000. 00

Balance available for fiscal year 1938__--- ----                        ---------                  2 3, 365, 737. 20

Amount (estimated) required to be appropriated for completion
of existing project ------------------------------------                                          18, 950, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
                -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For new work 3                                                                                   5, 000, 000. 00
   For maintenance 3-------------------------------------                                               18, 000. 00

           Total--------------------------------------------                                        5, 118, 000. 00
  2 Includes $32,000 revoked since June 30, 1937.
   aExclusive of available funds.

       3. RARITAN RIVER TO ARTHUR KILL CUT-OFF CHANNEL, N. J.

   Location.-Western portion of Raritan Bay.
   Existing project.-This provides for a channel about 1 mile long,
20 feet deep at mean low water and 800 feet wide, to connect the
Raritan River Channel with the southern end of the Arthur Kill
Channel, New York and New Jersey Channels project. The mean
range of tides is about 5 feet. High easterly or westerly winds cause
irregular tidal fluctuations from 1 to 2 feet above or below the mean
range.
   The estimate of cost of new work made in 1933 was $600,000. The
latest (1935) approved estimate of annual cost of maintenance is
$21,000.
   The existing project was authorized by the Public Works Adminis-
tration under date of September 6, 1933, and by River and Harbor
    RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                            255


Act approved August 30, 1935 (H. Doc., No. 50, 73d Cong., 1st sess.),
which document contains latest published maps.
  Terminal facilities.-Throughchannel.
  Operations and results during ftscal year.-None. Bids for mainte-
nance to restore project dimensions were opened on June 8, 1937.
There were no costs or expenditures.
  Condition at end of fiscal year.-The project was completed in
1935. The controlling depth on June 30, 1937, was 18 feet for about
one-half of the project width.
  The cost and expenditures were $810,500, all for new work.
  Proposed operations.--It is proposed to expend an anticipated allot-
ment of $96,000 during the fiscal year 1938, in maintenance dredging
to restore project dimensions in the channel, by contract.
  Nd additional funds can be profitably expended during the fiscal
year 1939, as it is believed that the maintenance proposed during 1937
will insure a usable channel until the end of the fiscal year 1939.
                                      Cost and financial summary

Cost of new work to June 30, 1937 ------------------------------                                               $810, 500
Cost of maintenance to June 30, 1937------    ----------------

        Total cost of permanent work to June 30, 1937----------------810,                                               500
Net total expenditures              ----          -------------                                                 810, 500
Unexpended balance June 30, 1937--------------------------          --
Total amount appropriated to June 30, 1937-------------------------810,                                                 500

   Fiscal year ending June 30              1933           1934           1935               1936                1937.


Cost of new work         -      -                     $581, 360. 91   $227, 318. 00        $1, 621. 09
Cost of maintenance                                                                   -------
Total expended                                         530, 718. 34    278.,332. 12         1, 449. 54

Allotted-----------                                    600, 000.00     210, 500. 00I----------           .-1



                                    4. ELIZABETH RIVER, N. J.

   Location.-This river rises in the city of East Orange, N. J., and
empties into Arthur Kill. (See U. S. Coast and Geodetic Survey
Charts Nos. 285 and 369.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1879, and March 4, 1913. The costs and expenditures were $60,-
481.15 for new work and $58,791.21 for maintenance, a total of $119,-
272.36. For further details see page 199 of Annual Report for 1934.
   Existing project.-This provides for dredging a channel 12 feet
deep at mean low water, and 60 feet wide, widened at the bends,
from the mouth to Baltic Street Bridge, a distance of 1.1 miles.
The mean range of tides at the mouth is about 4.7 feet. High east-
erly or westerly winds cause irregular tidal fluctuations from 1 to 2
feet above or below mean range.
   The estimate of cost for new work made in 1935 is $74,000, ex-
clusive of amounts expended on previous projects. The latest (1935)
approved estimate for annual cost of maintenance is $5.000.
   The existing project was adopted by the River and Harbor Act.
approved August 30, 1935 (Rivers and Harbors Committee, Doc. No.
        20196-37-pt. 1              17
256             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

24, 72d Cong., 1st sess.), which document contains latest published
map.
   Local cooperation.-The existing project was authorized subject
to the conditions that local interests shall remove all structures,
bulkheads, wharves, or parts thereof extending channelward of the
harbor lines between the South Front Street Bridge and Baltic
Street Bridge, and shall construct in advance of the dredging above
South Front Street Bridge suitable continuous bulkheads along both
banks of the river, and shall also furnish, free of cost to the United
States, suitable areas for disposal of dredged material during initial
construction.
   None of these conditions has been complied with.
   Terminal facilities.-There are 10 private concerns owning wharves,
of which 4 have both rail and water facilities; the others have no
railroad connections; only 1 has any mechanical appliance for
handling freight. There is one publicly owned wharf. The facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-None. There were no
costs during the fiscal year. The expenditures were $401.36, all
charged against previous projects.
   Condition at end of fiscal year.-No work has been performed
under the existing project. The controlling depth at mean low water
   '
b i iine 30, 1937, was about 6 feet to the Central Railroad of New
J sy bridge, thence about 2 feet to Baltic street. There were no
costs or expenditures under the existing project.
   Ioposed operations.-Thereare no unexpended funds and no work
is contemplated during the fiscal year 1938.
   The sum of $15,000 can be profitably expended during the fiscal
year 1939, for maintenance dredging by contract of the 6-foot project
during the period March and April, 1939.
                                           Cost and financial summary

Cost of new work to June 30, 1937---------------------     _                                      $60, 481. 15
Cost of maintenance to June 30, 1937___________________________                                    58, 791. 21
       Total cost of permanent work to June 30, 1937                                              119,272. 36
Net total expenditures-----------------------------------------_                                  119, 272. 36
Total amount appropriated to June 30, 1937                                                        119, 272. 36

           Fiscal year ending June 30                1933       1934           1935        1936              1937

Cost Of new work -.......
Cost of maintenance---------................-    ------------   $294. 59
                                                                           --i.-i.-.
                                                                           $14, 571.97     $42. 03
                                                                                                      -   I.29----
                                                                                                          ------
Total expended-          ------------------------------          294. 59     14, 571. 44     27. 20           $401.36
Allotted_               ----------------------..
                                           ------------ 15,294.59.

Balance unexpended July 1, 1936-- -------......    _____________-                                          $401. 36
Gross amount expended--------- --      ------------------------                                             401. 36
Amount (estimated) required to be appropriated for completion of
existing project-------------- --------------------------------                                      74, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ________             ________________                                      15, 000. 00
   RIVERS AND HARBORS-SECOND         NEW YORK, N. Y., DISTRICT    257
                      5. RAIlWAY RIVER, N. J.

   Location.-The Rahway River is about 25 miles long. It rises
near Pleasantdale, N. J., and flows in a generally southerly direction
about 19 miles to the city of Rahway, and thence about 6 miles
easterly to join the Arthur Kill at Carteret, N. J. (See U. S. Coast
and Geodetic Survey Charts Nos. 369 and 385.)
   Previous projects.-Adopted by River and Harbor Act of March 3,
1879. The total cost and expenditures were $37,000 for new work.
For further details of previous projects see page 113 of Annual
Report for 1895.
  Existing   project.-This provides for a channel 8 feet deep at mean
low water from the mouth of the river to a point just above Lam-
bert's wharf, a distance of about 2.4 miles, the width to be generally
100 feet, widening at the entrance, at bends, and at the turning basin
at the head of the improvement. The mean range of tide at the
mouth is about 5 feet and about 4 feet at Milton Avenue. High
easterly or westerly winds cause irregular tidal fluctuations from 1
to 2 feet above or below normal range.
   The estimate of cost of new work made in 1933 is $35,400, exclusive
of amounts expended on previous projects. The latest (1935)
approved estimate of cost of annual maintenance is $8,000.
   The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (H. Doc. No. 63, 73d Cong., 1st sess.). The
latest published map is in the project document.
   Recommended modifications of project.-The project adopted by
act of March 3, 1879, was recommended for abandonment in House
Document No. 467, Sixty-ninth Congress, first session.
   Local cooperation.-The project was authorized subject to condi-
tions that local interests shall construct at least one wharf open
to the public, and suitable for barge traffic, within one-half mile of
the head of the improvement; and shall furnish free of cost to the
United States suitable areas for the disposal of dredged material
during initial construction, and for future maintenance as and when
needed. No public wharf has been provided. Land for disposal of
dredged material has been offered.
   Terminal facilities.-There are no public or municipal wharves on
the river at present. There are three serviceable privately owned
wharves used exclusively for private business and one small wharf
for yacht club. When conditions of local cooperation for providing
public wharf are met, the terminals will adequately provide for the
anticipated business.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing project. The controlling depth at mean low water on June
30, 1937, up to Lamberts wharf was about 6 feet. There have been
no costs or expenditures under the project.
   Proposed operations.-There are no unexpended funds and no
work is contemplated during the fiscal year 1938.
   It is believed that conditions of local cooperation governing the
existing project will be met and work on the project can be done dur-
ing the fiscal year 1939. Therefore the sum of $35,400 can be profita-
bly expended during the fiscal year 1939, for new work by contract to
carry out completion of the project.
258       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                            Cost and financial summary

Cost of new work to June 30, 1937---------------                                  $3, 000
Cost of maintenance to June 30, 1937    ----------------               --            -----

      Total cost of permanent work to June 30, 1937----                      --    37, 000
Net total expenditures                                                                , 000
                                                                                   37------------------------
Total amount appropriated to June 30, 1937------------------------                 37, 000
Amount (estimated) required to be appropriated for completion of
existing project-------------------------------------------                       35, 400
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work          ...---------------------------------------------     35, 400

                         6. WOODBRIDGE CREEK, N. J.

   Location.-This creek is a small stream, rising near Rahway and
flowing through marshes into the west side of Arthur Kill. (See
U. S. Coast and Geodetic Survey Charts Nos. 286 and 369.)
   Previous project.-Adopted by River and Harbor Act of March 3,
1879. The total cost and expenditures were $19,000, for new work.
Work under the existing project began in 1902. For further details
see page 1777 Annual Report for 1915.
   Existing project. This provides for a channel 8 feet deep at mean
low water, 50 feet wide on the bottom and 75 feet wide on top, extend-
ing from Arthur Kill to the Salamander Dock, a distance of about
9,600 feet. The mean range of tides is about 5 feet. High easterly or
westerly winds cause tidal fluctuations of about 2 to 4 feet above and
below the mean range.
   The estimate of cost for new work, made in 1902, was $35,000, ex-
clusive of agmounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $5,000.
    The existing project was adopted by the River and Harbor Act of
June 13, 1902 (H. Doc. No. 282, 56th Cong., 1st sess., and Alnual
Report for 1900, p. 1552). The latest published map is, in the project
document.
    Terminal facilities.-There are two publicly owned wharves and
one privately owned wharf, whose facilities are open to all on equal
terms. There are seven private wharves used exclusively for private
business. These terminals adequately provide for the handling of the
existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was completed
in 1908 at a saving of $4,177 under the estimated cost. Maintenance
dredging has been performed several times since that date. The con-
trolling depth at mean low water on June 30, 1937, was about 8 feet
from the mouth to the upper end of the project.
    The total costs and expenditures under the existing project were
 $30,822.70 for new work and $146,027.33 for maintenance, a total of
 $176,850.03.
    Proposed operations.-There are no unexpended funds and no work
is contemplated during the fiscal year 1938.
    The sum of $15,000 can be profitably expended during the fiscal
year 1939, for maintenance dredging of the entire project by contract
during the period May and June 1939.
   RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                259
                                    Cost and financial summary

Cost of new work to June 30, 1937---------------------------                              $49, 822. 70
Cost of maintenance to June 30, 1937                                                       46, 027. 33
                                                                                          1-------------------------

      Total cost of permanent work to June 30, 1937------------- 195, 850. 03
Net total expenditures     -------------------   ---------       195, 850. 03
Total amount appropriated to June 30, 1937-------------------195, 850. 03

        Fiscal year ending June 30             1933        1934        1935        1936          1937


Cost of new work_--------    ------------    ------------------------------------------
Cost of maintenance---------------------------- .$701.90  $16, 947. 66  $52.34       .-.
Total expended.---__            ---
                       __------------__                     701.90   16, 946. 91     53. 09     -..
Allotted----------------          ---------------------- 15701.90     2,000.00


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance-------------------------------                                 $15, 000. 00

                       7. LEMON CREEK, STATEN ISLAND, N. Y.

   Location.-This creek is a small tidal stream at the south end of
Staten Island, emptying into Princess Bay, near Seguine Point. It
is about 10 miles west of Sandy Hook, N. J. (See U. S. Coast and
Geodetic Survey Charts Nos. 286 and 369.)
   Existing project.-This provides for a channel 8 feet deep at mean
low water and 100 feet wide from deep water in Princess Bay to the
Bayview Avenue Bridge, thence 70 feet wide to a basin of the same
depth, 280 feet wide and 540 feet long, in the low ground 1,900 feet
above the mouth of the creek. The mean range of tide at the mouth
of the creek is 4.9 feet, range of spring tides is 5.9 feet, and irregular
fluctuations due to wind conditions vary from 1 to 2 feet above or
below the normal range.
   The estimated cost for new work made in 1937 is $43,000; the latest
 (1937) approved estimate of cost of annual maintenance is $1,750.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (Rivers and Harbors Committee Doc. No. 27, 75th
Cong., 1st sess.).     The latest published map is in the project
document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests shall:
   (a) Furnish, free of cost to the United States, suitable spoil-disposal areas
for new work and for subsequent maintenance as required.
   (b) Convey to the United States perpetual easements to excavate all lands
included between harbor lines.
   (c) Remove all structures from land included between harbor lines.
   (4) Remove or reconstruct the Bayview Avenue Bridge.
   (e) Recondition the existing bulkhead on the left bank of the creek near its
mouth.
  (f) Construct adequate bulkheads along the harbor lines on both banks of
the creek for approximately 400 feet above the Bayview Avenue Bridge.
   (g) Release the United States from all claims for damages attributable to the
work of improvement.
   (h) Furnish assurances satisfactory to the Secretary of War that they will
provide the necessary boat stalls and bulkheads along the anchorage basin.
   These conditions have not been complied with.
260      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.-There is about 800 feet of berthing space
available at bulkheads along the creek, of which 200 feet is open to
the public on equal terms. In addition there are 5 boat-repair yards
with marine railways on the waterway. Present docking facilities,
together with anchorage areas and bulkheads to be provided under
the existing project are considered reasonably adequate for present
and future needs.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project and there has been no cost or expenditure. The controlling
depth in the natural waterway when examined in March 1936 varied
from 0.5 foot above mean low water at the mouth to 0.5 foot below
mean low water at the Bayview Avenue Bridge and 1.0 foot above
mean low water at the head of the project.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year ending June 30, 1938.
   It is expected that the conditions of local cooperation imposed by
Congress in adopting this project will not be complied with during
the next 2 years. Therefore, no funds can be profitably expended
during the fiscal year ending June 30, 1939.
                         Cost and financial summary

Cost of new work to June 30, 1937__      ___________________________     ______
Cost of maintenance to June 30, 1937_______--     -      -     -         -

      Net total expenditures
Total amount appropriated to June 30, 1937------------------------          ---
Amount (estimated) required to be appropriated for completion of
existing project--------------------------------------          -----   43, 000

               8. GREAT KILLS,      STATEN    ISLAND, N. Y.

  Location.-GreatKills is a small harbor contiguous to lower New
York Bay, located on the southeasterly shore of Staten Island, N. Y.,
distance about 61/ nautical miles from the entrance to upper New
York Bay to the eastward and about the same distance from Staten
Island Sound to the westward. (See U. S. Coast and Geodetic
Survey Chart No. 369.)
  Existing project.-This provides for an entrance channel from
deep water in lower New York Bay to the entrance of the harbor
in the vicinity of the present westerly end of Crooks Island, about
1 mile in length, 10 feet deep at mean low water, and 150 feet wide.
The mean range of tide is about 5.0 feet. Extreme easterly or west-
erly winds produce fluctuations of 1 to 3 feet above or below the
mean range.
  The estimated cost, made in 1924, was $62,000 for new work and
$5,000 for annual maintenance.
  The existing project was authorized by the River and Harbor:Act
approved January 21, 1927 (H. Doc. No. 252, 69th Cong., 1st sess.).
The latest published map is printed in the project document.
  Local cooperation.-Fully complied with.
   Terminal facilities.-None. There are several piers used as small
boat landings, none of which' are used for commercial purposes.
   Operations and results during fiscal year..-None.
    RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                                                     261

  Condition at end of fiscal year.-The project was completed in 1935,
at a saving of $26,000 under the estimated cost. The controlling
depth throughout the channel on June 30, 1937, was about 10 feet at
mean low water. The costs and expenditures were $36,000, all for
new work, and all from Public Works funds.
  Proposed operations.-There are no unexpended funds and no
work is contemplated during the fiscal year 1938.
  The harbor to which the Government channel gives access is being
deepened by the city of New York. Therefore, it is believed that the
sum of $15,000 can be profitably expended for maintenance dredging
by contract of the entrance channel during the fiscal year 1939.
                                                   Cost and financial summary

Cost of new work to June 30, 1937__1_                                            ____11111111                      _                     $36, 000
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937 ______----___                                                                         36, 000
Net total expenditures__-- __---______________         -      -                                                                           36, 000

           'Total amount appropriated to June 30, 1937------------------                                                                  36, 000

           Fiscal year ending June 30                                 1933          1934             1935           1936                  1937


Cost of new work_----------------   --.--.--.
Cost of maintenance-----------------.--                                ----
                                                                         -.
                                                                                                   $32, 646. 67
                                                                                               ----------------
                                                                                                                  $3, 353. 33     ---..
                                                                                                                                 -----
Total expended                          -------------------------------------
                                  ...-----                                                         28, 915. 18     7, 084.82----------
Allotted    ..... ------------------------------------                          ------------ 36, 000. 00                   ...........


Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance___-____________                                               _                -      -________ $15,000

                                                  9. RARITAN RIVER, N. J.

   Location.-This river is a moderate-sized stream rising in the
north-central part of New Jersey and flowing in a general south-
easterly direction into Raritan Bay, between Perth Amboy and South
Amboy. (See U. S. Coast and Geodetic Survey Chart No. 375.)
   Previous projects.- A survey of Raritan River for the improve-
ment of New Brunswick Harbor was made in 1836; in 1836 and 1837
the total sum of $13,963 was appropriated for the work; the records
of this office do not show what work was done. Subsequent projects
were adopted by acts of June 18, 1878, and March 3, 1881. The cost
and expenditures on previous projects have been $673,155.32 for new
work and $111,419.43 for maintenance, a total of $784,574.75.
   For further details see page 1777 of Annual Report for 1915 and
page 359 of Annual Report for 1918.
   Existing project. This provides for a channel 25 feet deep and
300 feet wide extending from the turn in New York and New Jersey
channels near Great Beds Light to the junction of main and south
channels opposite Keasby, a distance of 4.4 miles; thence a channel 15
feet deep and 200 feet wide, to the Washington Canal, a distance of
4.4 miles; thence 10 feet deep in soft material, 11 feet deep in rock,
and generally 100 feet wide with widening at bends to the Delaware
& Raritan Canal entrance at New Brunswick, a distance of 5.0 miles;
and for a south channel, 25 feet deep and 300 feet wide from the
262     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

junction with the main channel at Keasby to the upper limit of the
Titanium Pigment Co. property, a distance of 0.8 mile; thence 10
feet deep and 150 feet wide to the upper junction with the main chan-
nel at Crab Island, a distance of 2.4 miles. The plane of reference is
mean low water. The mean range of tides is about 5 feet at the
mouth of the river and 51/2 feet at New Brunswick. High easterly
or westerly winds cause irregular tidal fluctuations from 1 to 2 feet
above or below the mean range.
   The estimate of cost for new work, revised in 1937, is $1,015,000,
exclusive of amounts expended on previous projects, but including
$66,000 to be contributed by local interests. The latest (1937) ap-
proved estimate for annual cost of maintenance is $45,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1919, provided for the 15-foot
channel and the south channel (H. Doc. No. 1341, 62d Cong., 3d
sess.); the act of July 3, 1930, provided for the 25-foot channel up to
the New York & Long Branch Railroad Bridge (H. Doc. No. 127,
70th Cong., 1st sess.), the 10-foot channel in soft material and 11
feet in rock (H. Doc. No. 454, 70th Cong., 2d sess.), and the relocation
of the lower reach of the south channel (Rivers and Harbors Com-
mittee Doc. No. 31, 71st Cong., 2d sess.); and the act of August 26,
1937, provided for the 25-foot channel from the New York & Long
Branch :Railroad Bridge to the junction of the main and south chan-
nels and the south channel to the Titanium Pigment Co. (Rivers and
Harbors Committee Doc. No. 74, 74th Cong., 2d sess.). The latest
published maps are in the above project documents.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests shall contribute $66,000 toward the first
cost and furnish spoil disposal areas for new work and subsequent
maintenance.
   Terminal facilities.-The city of Perth Amboy owns about 1,875
feet of undeveloped frontage on Raritan River. The city of New
Brunswick owns three small sites located on the Delaware & Raritan
Canal, one of which has a small wharf on it, and also a considerable
frontage on the river below the outlet locks of the Delaware &
Raritan Canal, and has constructed a public terminal on the site.
Other private terminals are open to public use. The Government has
established a large ammunition and storage depot and arsenal on
Raritan River known as Raritan Arsenal. A new wharf has been
constructed on the south channel. Thirty-eight other wharves are
located on Raritan River and on the Delaware & Raritan Canal at
New Brunswick, N. J. The terminals are considered adequate for
the existing commerce. (For further details see Port Series No. 20,
pts. II and III, Corps of Engineers.)
   Operations and results during fiscal year.-None. Surveys for
maintenance dredging were made. Bids for maintenance dredging
in the lower 3,000 feet of the south channel were canvassed on June
29, 1937.
   There were no costs during the year. Accounts payable of $6.79
outstanding at the beginning of the year were paid during the
year.
   Condition at end of fiscal year.-Work under the project is about
70 percent completed. A channel 25 feet deep at mean low water and
300 feet wide has been completed from the turn in the New York
   RIVERS AND HARBORS-SECOND                      NEW YORK, N. Y., DISTRICT         263

and New Jersey channels near Great Beds Light to the New York
and Long Branch Railroad bridge of the Central Railroad of New
Jersey, 2.1 miles above the junction with the New York and New
Jersey channels. A channel 15 feet deep and 200 feet wide has been
completed from a point opposite Keasby to the mouth of the Wash-
ington Canal, 4.4 miles; thence a channel has been completed 10 and
11 feet deep and 100 feet wide to the Delaware and Raritan Canal
outlet lock at New Brunswick, a distance of 5 miles. The south
channel has been dredged 10 feet deep and 150 feet wide for a dis-
tance of 14,500 feet. The mean low water controlling depths on June
30, 1937, were 23 feet from New York and New Jersey channels near
Great Beds Light to the vicinity of the highway bridge; thence 16
feet to Ostranders dock; thence 15 feet to the Washington Canal;
thence 10 and 11 feet to the Delaware and Raritan Canal lock at New
Brunswick; in the south channel 9 feet up to the Titanium Pigment
dock; thence 7 feet to Crossman's dock; thence 3 feet for about 6,000
feet; thence to the upper end of the south channel, about 1.5 feet. The
work remaining to be done to complete the project consists of dredg-
ing the main channel to a depth of 25 feet and a width of 300 feet
from the New York and Long Branch Railroad bridge to the junc-
tion of the main and south channels opposite Keasby, and the south
channel to a depth of 25 feet and a width of 300 feet from the main
channel at Keasby to the upper limit of the Titanium Pigment Co.
property, thence 10 feet deep and 150 feet wide to the upper junc-
tion with the main channel at Crab Island.
    The total costs and expenditures under the existing project were
$803,351.47-$708,039.09 for new work and $95,312.38 for mainte-
nance.
   Proposed operations.-It is proposed to apply the funds unex-
pended, $15,344.33 on June 30, 1937, to maintenance dredging by con-
tract to restore project dimensions in the south channel up to the
plant of the Titanium Pigment Co. during August and September,
1937.
   It is expected that conditions of local coperation will be complied
with during the next 2 years. Maintenance dredging to restore proj-
ect dimensions should be continued. Therefore, the sum of $297,000
including $66,000 to be contributed by local interests, can be profit-
ably expended during the fiscal year ending June 30, 1939, as follows:
New work: Complete by June 30, 1939, under a contract to be entered
  into, the dredging of the 25-foot channel from the New York and
  Long Branch railroad bridge to the upper limit of the Titanium
Pigment Co. property_ -___-________                                $267, 000
Maintenance: Complete by June 30, 1939, under a contract to be en-
  tered into, dredging to restore the channel to project dimensions
  where   shoaling   periodically   occurs_ _--
                                             ___________         __---------__    30, 000
      Total -----------        -----------------------------                     297, 000
                            Cost and financial summary

Cost of new work to June 30, 1937--------------------------$1,               381, 194. 41
Cost of maintenance to June 30, 1937--------------------206,                      731.81
      Total cost of permanent work to June 30, 1937------------          1, 587, 926.22
                     -------
Net total expenditures        ---                                        1, 587, 926. 22
Unexpended balance June 30, 1937----
                                  ..                                         15, 344.33
      Total amount appropriated to June 30, 1937-- ----                  1, 603, 270. 55
264      -REPORT                 OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


          Fiscal year ending June 30                        1933           1934           1935           1936             1937

Cost of new work     _--_
                   ---------------------------------------------------                                $22,580.18
Cost of maintenance_-----------------_ $31,861. 29                       $1, 096.83    $18, 515. 59       318.71
       Total cost--.....                         -_________
                                                         31,861. 29       1, 096. 83    18, 515. 59    22, 898. 89   ----------
Total expended         ....----------------------         32, 339. 26       981.44      18, 587. 45    22, 935. 63           $6. 79
Allotted----------------------------                     22, 347.13      58, 924.48     51, 000. 00    45, 000. 00     -97, 500. 00


Balance unexpended July 1, 1936___---  -__    ____________--$112, 851. 12
Deductions on account of revocation of allotment ____ ________ 97, 500. 00
      Net amount to be accounted for------------------------                                                         15, 351. 12
Gross amount expended--------------------------$205.17
Less reimbursements collected---------------------   198. 38
                                                                                                                            6. 79
     Balance unexpended June 30, 19371----------------------                                                          5, 344. 33
Amount (estimated) required to be appropriated for completion
    of existing          project 12 -- ___________                                                               241, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -                      201, 000. 00
   For maintenance - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - - - - - - - -                     30, 000. 00
                        - - - - - - - - - - - - -- -   - -- - - -- - -- - -- - - -- - -       - -- - -- - -
           Total                                                                                                231, 000. 00
   1 Exclusive of available funds.
   2 In addition $60,000 to be contributed by local interests.

                   10. WASHINGTON CANAL AND SOUTH RIVER, N. J.

   Location.-This river rises in central New Jersey and empties into
the Raritan River. (See U. S. Coast and Geodetic Survey Chart
No. 375.)
   Previous projects.--Adopted by River and Harbor Acts of March
3, 1871, June 14, 1880, and July 25, 1912. The total cost and expendi-
tures were $242,158.87, of which $157,224.41 was for new work and
$84,934.46 for maintenance. For further details see page 1778 of
Annual Report for 1915 and page 323, Annual Report for 1929.
   Eaisting project.-This provides for a channel, to be obtained by
diking and dredging, 12 feet deep and 100 feet wide in Washington
Canal, 1.1 miles, and 12 feet deep and generally 150 feet wide in
South River following cut-off no. 1 up to Old Bridge, 4.1 miles.
The tidal variation at the canal is 5.34 feet, and at Old Bridge, 4.57
feet. Irregular tidal fluctuations from 1 to 2 feet, respectively, above
or below the mean range takes place during high easterly or westerly
winds.
   The estimate of cost for new work, made in 1929 was $90,000, ex-
clusive of amounts expended on previous projects. The latest (1929)
approved estimate for annual cost of maintenance is $8,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 109, 71st Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There is 1 publicly owned wharf at South
River, and 10 private wharves, some of which are open to public use.
These facilities are considered adequate for existing commerce. (For
      RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                                 265

further details see Port Series No. 20, pts. II and III, Corps of
Engineers.)
   Operations and results during fiscal year.-None. Preliminary
work was done with a view to determining whether maintenance
dredging was necessary. The total cost for the year was $3.41, all
for maintenance. The expenditures were $9.87. .
   Condition at end of fiscal year.--Work on the section of the exist-
ing project to be done by the United States, extending from the
mouth of Washington. Canal to the highway bridge at South River,
was completed in 1931, at a saving of $41,108, under the estimated
cost. The section from the highway bridge at South River up-
stream to the head of the project has been completed, except at the
extreme upper end, by the State of New Jersey. The controlling
depth on June 30, 1937, at mean low water was 12 feet to the Raritan
River railroad bridge at South River; thence 11 feet to Tennents
Creek; thence 9 feet to South River Sand Co. dock; and thence 2
feet to the upper end of the project at Old Bridge.
   The total costs and expenditures under the existing project, exclu-
sive of $364.73 contributed funds which were expended for new
work, were $48,891.82 for new work and $50,309.09 for maintenance,
a total of $99,200.91.
   Proposed operations.-The unexpended balance, $7,912.83, on June
30, 1937, was revoked during July 1937. No maintenance work is
proposed during the fiscal year 1938.
   The sum of $8,000 can be profitably expended during the fiscal
year 1939, in maintenance dredging, by contract, to restore project
dimensions in the sections of the channel which shoal periodically.
The work will be undertaken during May and June 1939.
                                                  Cost and financial summary
Cost of new work to June 30, 1937-------------------------__                                                    $206, 116. 23
Cost of maintenance to June 30, 1937 ----__-------           -________                                           135, 243. 55
              Total cost of permanent work to June 30, 1937                               ------------            341, 359. 78
Net total expenditures__     ---------------------------------- 1 341, 359. 78
Unexpended balance June 30, 1937----___________
                                             --
                                       -__________                  7, 912. 83
             ;Total        amount appropriated to June 30, 1937____________                                      1349, 272.61
             Fiscal year ending June 30                         1933          1934          1935          1936           1937

Cost of new work-------------------------- - ----- -                            -- - - - -- -       - ---
cost of maintenance-------------------$26, 462.90                           $1, 065. 58 $21, 061.29       $286.84           $-3.41
Total expended---------...............-----------..........   26,462.90      1,013.42     21, 113.45      280.38                9.87
Allotted--....--------------..        .-..---.                16, 259. 58   24, 985. 69    5,344. 26


Balance unexpended July 1, 1936_______________---________                                                           $7, 922. 70
Gross amount expended                                                                                                      . 87
                                                                                                                          9------------------------
     Balance unexpended June 30, 1937 ------------------------                                                       7,912. 83
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance - - - - - - - - - - - - -          _- -                                                   8, 000. 00
    1Exclusive   of $364.73 contributed funds expended for new work.
     2 Exclusive of available funds.
266             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                    11. KEYPORT HARBOR, N. J.

   Location.-This harbor lies at the mouth of Matawan Creek, on
the south side of Raritan Bay, about 9 miles west of Sandy Hook.
 (See U. S. Coast and Geodetic Survey Chart No. 369.)
   Existing project.-This provides for a channel about 1 mile long
from Raritan Bay to the steamboat dock at Keyport, the width to be
200 feet and the depth to be 8 feet at mean low water. The mean
range of tides is 4.9 feet. High easterly or westerly winds cause the
tides to fluctuate from 1 to 2 feet above or below the mean range.
   The estimate of cost for new work, made in 1883, was $40,475. The
latest (1917) approved estimate for annual cost of maintenance is
$5,000.
   The project was adopted by the River and Harbor Act approved
August 2, 1882 (H. Doc. No. 153, 42d Cong., 3d sess., and Annual
Report for 1873, p. 941). The latest published map is printed in the
Annual Report for 1905, page 1040.
   Terminal facilities.-There are four privately owned wharves lo-
cated on Keyport Harbor. Only one of these is open to public use.
The terminal facilities are considered adequate under existing
conditions.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in 1911.
The controlling depth on June 30, 1937, was about 8 feet at mean
low water.
   The total costs and expenditures under the existing project were
$40,475 for new work and $138,994.04 for maintenance, a total of
$179,469.04.
   Proposed operations.-There are no unexpended funds and no work
is contemplated during the fiscal year 1938.
   The sum of $20,000 can be profitably expended during the fiscal
year 1939, for maintenance of the project.
                                       Cost and financial summary

Cost of new work to June 30, 1937-- ____-- __-__________--- - __ $40, 475. 00
Cost of maintenance to June 30, 1937---------------------------138, 994.04
      Total cost of permanent work to June 30,                               1.937--------------                179,469. 04
Net total expenditures    -______-_________________                                                             179, 469. 04
Total amount appropriated to June 30, 1937         ___                                                          179,469.04
                                                                                                                1_____________--

            Fiscal year ending June 30                   1933         1934             1935             1936            1937


Cost of new work....---- .......--- --
Cost of maintenance-----------------------
                                          --
                                       ______
                                              -------
                                                   $20, 647.90
                                                                              ------     $67.43
                                                                                                    -   -----    - -----....

Total expended--....      --.---------.------                       20, 601. 62          113. 71
Allo tted     ex p---             - - -- -      -   ------------
                                                           -------------
                                                                 20, 969. 48 "         -2 5 4. 15


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance_------------                           $20, 000. 00
  RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT             267
          12. SHOAL HARBOR AND COMPTON CREEK, N. J.

   Location.-Shoal Harbor is an indentation on the south shore of
Raritan and Sandy Hook Bays. Compton Creek is a small stream
rising on the west side of the Navesink Highlands and flowing
through the meadows into Shoal Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 369.)
   Previous projects.-Adopted by River and Harbor Act of Septem-
ber 19, 1890. The costs and expenditures to June 30, 1935, were
$17,000 for new work and $169,708.83 for maintenance, a total of
$186,708.83. For further details see annual report for 1934, page 211.
   Existing project.-This provides for dredging a channel 8 feet
deep at mean low water, extending from deep water in Sandy Hook
Bay to the Main Street Bridge across Compton Creek, a distance of
1.28 miles, with a width of 150 feet in the bay and 75 feet inside
the mouth of the creek, and suitably widened at the bend in the
creek. The mean range of tides is 4.5 feet. Irregular fluctuations
from 1 to 2 feet above or below the mean range occur during times
of heavy easterly or westerly winds.
   The estimate of cost of new work, made in 1933, is $44,000. The
latest (1935) approved estimate of annual cost of maintenance is
$15,000.
   The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (H. Doc. No. 58, 73d Cong., 1st sess.).
The latest published map is printed in the project document.
   Recommended modifications of project.-Curtailment of the proj-
ect of September 19, 1890, by elimination of the proposed dike and
reducing the width of the channel in the bay from 150 feet to 100
feet, is recommended in House Document No. 467, Sixty-ninth Con-
gress, first session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are no public terminals located on this
waterway. There are 3 terminals suitable for barge traffic located
near the mouth of Compton Creek, 2 of which are open to the pub-
lic on equal terms and 2 of which are equipped with loading and
unloading devices. Within the navigable section of the creek above
the project limit there are over 30 small terminals and 2 marine
ways suitable for small fishing boats.
   Operations and results during fiscal year.-A contract for dredg-
ing to complete the existing project was commenced on August 25,
1936, and was completed on October 19, 1936, at a cost of $28,864.33,
for new work. Preliminary surveys and studies were performed
with Government plant and hired labor in connection with proposed
dredging at a cost of $814.60, for new work. The total costs were
$29,678.93 for new work. The expenditures were $29,744.98.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936 at a saving of $13,718 under the estimated cost. The
controlling depth throughout the channel on June 30, 1937, was
about 8 feet at mean low water. The total costs and expenditures
under the existing project were $30,281.99, all for new work.
   Proposed operations.-There are no unexpended funds and no
work is contemplated during the fiscal year 1938.
   The sum of $30,000 can be profitably expended during the fiscal
year 1939, for maintenance dredging of the entire project.
268         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                  Cost and financial summary
Cost of new work to June 30, 1937------------------------------                                   $47, 281.99
Cost of maintenance to June 30, 1937----------------------------                                  169, 708. 83
      Total cost of permanent work to June 30, 1937--------------210,990.82
Net total expenditures------------- ---------------------------- 216,990.82
Total amount appropriated to June 30, 1937---------------------__ 216, 990. 82

        Fiscal year ending June 30              1933         1934          1935            1936          1937


Cost of new work...........----------------------------------------------------$603.06I                $29,678.93
Cost of maintenance------------------ $11, 568. 74          $1,063.23         $8.49          ________

Total expended-    -----------------------10, 568. 74      2, 063. 23         8. 49         537.01      29, 744.98
Allotted------------------------------       11, 931. f3   12, 991. 32   10, 000. 00   ------------      8,000. 00


Balance unexpended July 1, 1936--------------------------------- $21, 744.98
Amount allotted from War Department Appropriation Act approved
  May 15, 1936_                                 __    __           8, 000. 00

      Amount to be accounted for-------------------------------                                      29, 744. 98
Gross amount expended-----------------------------------------                                       29, 744.98

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance-----------------------------------__                                      30, 000. 00

                                 13. SANDY HOOK BAY, N. J.

   Location.-The bay is the southern portion of Lower New York
Bay, west of and adjoining the projecting arm of Sandy Hook, N. J.
 (See U. S. Coast and Geodetic Survey Charts Nos. 369 and 543.)
   Eaisting project.-This provides for the construction of a con-
tinuous rubble-mound breakwater about 4,000 feet in length extend-
ing eastward from the New Jersey Central Steamboat Co. dock at
Atlantic Highlands, N. J., and dredging of the area in its lee and
seaward of the proposed new pierhead line to a depth of 8 feet at
mean low water. Mean range of tides, 4.7 feet, mean range of spring
tides, 5.6 feet; irregular fluctuations due to wind conditions vary
from 1 to 2 feet- above or below the mean range.
   The estimate of cost for new work made in 1937 is $850,000 includ-
ing $81,250 to be contributed by local interests. The latest (1937)
approved estimate of cost of annual maintenance, is $6,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 292, 75th Cong., 1st sess.). For latest
published map see the project document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests shall contribute $81,250 toward the ini-
tial cost; furnish, free of cost to the United States, easements and
rights-of-way necessary for the initial construction and subsequent
maintenance of the Federal project; release the United States from
any claims for damages attributable to the work of improvement, and
agree to provide berthing and mooring facilities of design satisfac-
tory to the Chief of Engineers and including adequate accommoda-
tions for transient boats, boat stalls for local craft, and a public dock
with servicing facilities, all to be constructed concurrently with the
proposed Federal breakwater; and provided further that work shall
not ble undertaken until the harbor lines at the locality shall have been
  RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                         269
relocated shoreward. These provisions have not yet been complied
with.
   Terminal facilities.-Fourwater terminals, with available dockage
of 1,700 feet are located along the waterfront at Atlantic Highlands
westerly of and adjacent to the area under improvement. The exist-
ing piers and those required under conditions of local cooperation are
considered sufficient for present needs. There is ample space for
additional wharves and boat basins should future needs warrant
their construction. (For further details of existing facilities see
Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project and there has been no cost or expenditure.
   When examined in June 1936 project depth existed in the area to
be dredged except for a strip about 500 feet wide adjacent to the
proposed pierhead line where the controlling depth at mean low
water varied from 3.5 feet at the pierhead line to 8 feet at the outer
edge of the strip.
   Proposed operations.-No funds are available for this project, and
no work is proposed during the fiscal year ending June 30, 1938.
   It is expected that the conditions of local cooperation will be com-
plied with during the fiscal year and that local interests will provide
the required contribution of $81,250. Therefore, the sum of $850,000
 (including $81,250 contributed funds) can be profitably expended
during the fiscal year ending June 30, 1939, as follows:
New work:
    C(omplete, under contract, the construction of the rubble-mi~nnd
      breakwater as authorized by the River and IHarbor Act of Aug.
      26, 1937 -------------------------------------------    --------                     728,500
    Complete, under contract, dredging of the anchorage area to
      project dimensions -----------------------------------      -                         67, 500

            Total---------------------                                                     850, 000

                                      Cost and financial summary
Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937-                                             -

            '
      Net total expenditures__       __
Total amount appropriated to June 30, 1937_______________                         ______
Amount   (estimated)               required to be appropriated for completion of
existing       project 1-------               ___------------------
                                                 --                                        768, 750
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work         ----------------                       --------            768, 750
1 In addition, $81,250 to be contributed by local interests.

                                   14. SHREWSBURY RIVER, N. J.

  Location.-This river is mainly a large tidal basin in the eastern
part of New Jersey, the outlet being at the southeast end of Sandy
Hook Bay, about 4 miles south from the point of Sandy Hook. (See
TU. S. Coast and Geodetic Survey Chart No. 543.)
  Previous projects.-Adopted by River and Harbor Acts of August
30, 1852. March 181871, March 3. 1879, modified in 1883 and 1887,
and by the River and IIarbor Act of March 2, 1919. The costs and
expenditures were $220,893.95 for new work and $286,606.05 for main-
270     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

tenance, a total of $507,500. For further details see page 1778 of
Annual Report for 1915 and page 373 of Annual Report for 1918.
   Existing project.-This provides for dredging a channel 12 feet
deep and 300 feet wide, following the westerly shore, from deep
water in Sandy Hook Bay to a point 600 feet south of the railroad
bridge at Highlands, a distance of 2.2 miles; thence 9 feet deep and
generally 150 feet wide, suitably widened at bends and turns, in the
south branch of the river to the Branchport Avenue Bridge in the
city of Long Branch, a distance of 6.8 miles; and for a channel in
the north branch 6 feet deep and 150 feet wide from the junction to
Red Bank, a distance of 6.1 miles. All depths refer to the plane of
local mean low water. The mean range of tides on the outer bar is
5 feet; at Highlands Bridge, 3.2 feet; at Seabright, 1.2 feet; at
Branchport, 1.3 feet; and at Oceanic, 2.5 feet. High easterly or
westerly winds cause irregular tidal fluctuations from 1 to 2 feet
above or below the mean range.
   The estimate of cost for new work, revised in 1935, was $539,000,
exclusive of amounts expended on previous projects and exclusive
of $50,000 contributed by local interests. The latest (1935) approved
estimate of cost for annual maintenance is $45,000.
   The existing project was adopted by the following River and Har-
bor Acts: The act of March 2, 1919, provided for the 6-foot channel
in the north branch (H. Doc. No. 1296, 62d Cong., 3d sess.); the
Emergency Relief and Appropriation Act of 1935 (under the date
of May 28, 1935), and the River and Harbor Act approved August
30, 1935, provided for the 12-foot channel (H. Doc. No. 157, 71st
Cong., 2d sess.), and for the 9-foot channel (Rivers and Harbors
Committee Doc. No. 31, 74th Cong., 1st sess.). The project docu-
ments contain the latest published maps.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are 4 publicly owned wharves and 17
privately owned wharves used for commercial purposes, many of
which are open to general public use on equal terms. The terminals
are considered adequate for existing commerce.
   Operations and results during fiscal year.-A contract for new
work and maintenance dredging under the 6-foot project in the
North Branch extending from opposite Maple Avenue, Red Bank,
N. J., downstream about 4,600 feet, in progress at the beginning of
the fiscal year was continued and completed on August 12, 1936. The
cost for the year was $10,439.79 for new work and $14,416.87 for main-
tenance, a total of $24,856.66.
   A contract for dredging to complete the 12-foot project was com-
menced on September 16, 1936, and completed on January 11, 1937.
The cost for the year, exclusive of $36,311.03 contributed funds, was
$112,565.70 for new work.
   A contract for dredging under the 9-foot project modified to in-
clude removal of rock in the vicinity of Seabright Bridge was com-
menced on October 26, 1936, and completed on April 9, 1937. The
cost for the year was $237,811.62 for new work. Preliminary surveys
and expenses in connection with proposed work were performed by
Government plant and hired labor at a cost of $2,938.19, for new
work.
   The total cost for the year, exclusive of $36,311.03 contributed
funds, was $378,172.17, of which $363,755.30 was for new work and
      RIVERS AND HARBORS-SECOND                                         NEW YORK, N. Y., DISTRICT                              271

$14,416.87 for maintenance. The total expenditures, exclusive of
$36,311.03 contributed funds, were $390,355.52.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937, at a saving of $72,437 under the estimated cost. The
controlling depth at mean low water on June 30, 1936, was 12 feet
from Sandy Hook Bay to the vicinity of the junction of the 12- and
9-foot channels just south of the highway bridge at Highlands, where
a shoal has formed which has narrowed the channel to about 100 feet
with a controlling depth of about 8 feet, and thence 9 feet in the
main stem and South Branch to the Branchport Avenue Bridge at
Long Branch. In the North Branch about 6 feet was available to the
head of the project opposite Maple Avenue, Red Bank, N. J. The
total costs and expenditures under the existing project, exclusive of
$36,311.03 contributed funds expended for new work, were $466,562.59
for new work and $184,794.94 for maintenance, a total of $651,357.53.
  Proposed operations.-The unexpended balance, $4,899.73, on June
30,1937, was revoked during July 1937. No maintenance work is pro-
posed during the fiscal year 1938.
   The sum of $45,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging to restore project dimensions
whereshoals occur periodically. The work will be done by contract
dluring the period from April to June 1939.
                                                Cost and financial summary
                                     MAINTENANCE          AND      IMPROVEMENT             FUNDS

Cost of new work to June 30, 1937---------------------------                                                      $687, 456. 54
Cost of maintenance to June 30, 1937--------------------------                                                     471, 400. 99
           Total cost of permanent work to June 30, 1937_----------- 1, 158, 857. 53

Net total expenditures --------------------------------------                                                   1, 158, 857. 53
Unexpended balance June 30, 1937------------------------                                                             4, 899. 73
           Total amount appropriated to June 30, 1937-------------- 1, 163, 757. 26

           Fiscal year ending June 30                       1933              1934           1935           1936             1937


Cot of new work--------                               ----------------------------------                 $6, 502. 63     $363, 755. 30
Cost of-maintenance             -----------------         $9, 784. 35        $1, 570. 73   $1, 011. 47    10, 811. 80      14, 416. 87

       Total cost..           --------------------         9,784.35         1,570.73        1,011.47      17,314.43       378,172.17
Total expended          ---------------------
                             ....                          9, 802. 35       1, 537. 34        946 14       5,229. 80      390, 355. 52
Allotted       --------------------------                  8, 908.08       31, 468. 53     10, 000. 00   161, 500. 00     200. 000. 00


Balance unexpended July 1, 1936------------------------------$195, 255.25
Amount allotted from War Department Appropriation Act approved
  May 15, 1936----------------------------------------------    200,000.00
      Amount to be accounted for-----------------------------                                                       395, 255. 25
Gross gmount expended----------------------------$428, 627. 53
Less reimbursements collected -------------------    38, 272. 01
                                                                                                                    390, 355. 52
           Balance unexpended June                        30, 1937                                                       4,899. 73

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance -                                                                                            45, 000. 00
  1   Exclusive of available funds.
           20196-37-pt. 1--18
272          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                  CONTRIBUTED                     FUNDS

Cost of new work to June 30, 1937_----------------------------_ $36, 311.03
Cost of maintenance to June 30, 1937-----
      Total cost of permanent work to June 30, 1937--------------                                                                        36, 311.03
Net total expenditures___________________________                                                                                        36, 311. 03
Total amount contributed to June 30, 1937-----------------------                                                                         36,311.03

         Fiscal year ending June 30                           1933                    1934               1935              1936               1937


Cost of new work.----                --       -----------------------------------.------------                                              $36, 311.03

Total expended     ...     ..--------------------------------------------------------------                                                  36 311.03
Contributed----------                 ------------..........
                                                      ....--------........------------...---------                   $50, 000.00           -13,688.97


Balance unexpended July 1, 1936-                                                                                                        $50, 000.00
Deductions on account of amount refunded                                                                                                            97
                                                                                                                                         1,------------------------13,'
      Net amount to be accounted for ...                                                                                                 36, 311.03
Gross amount expended-----------------------------------------                                                                           36, 311.03
      CONSOLIDATED COST AND FINANCIAL                              SUMMARY FOR SHREWSBURY RIVER, Nj J.

Cost of new work to June 30, 1937-------------------        _                                                                      $723, 767. 57
Cost of maintenance to June 30, 1937--------------- ------- __-_                                                                    471, 400.99
         Total cost of permanent work to June 30, 1937--------                                                              _    1, 195, 168. 56
      Net total expenditures----------------------------                                                                         1, 195, 168. 56
Unexpended balance June 30, 1937   --                                                                                                 4, 899. 73
         Total amount appropriated                            and contributed                         to June 30,
          1937-------                                                                                                             , 200,068.29
                                                                                                                                 1----------------------------------

   Fiscal year ending June 30                 1933                       1934                     1935               1936                    1937


Cost of new work---..      ____
                             . _..        _____ ______ _____-___-_     _                     .         .            $6, 502. 63           $400, 066.33
Cost of maintenance                          $9, 784. 35   $1, 570. 73                           $1, 011.47         10, 811.80              14, 416.87

      Total cost            -______-_____
                                  _       9, 784.35                      1, 570. 73               1,011. 47         17, 314. 43            414, 483. 20

Total expended_----------------               9, 802. 35                1, 537. 34                  946. 14          5, 229. 80            426, 666. 55

Allotted-and contributed-----
                         .....---             8, 908. 08              31, 468. 53                10, 000. 00     -181, 500.00               186,311.03


Balance unexpended July 1, 1936--                                                                                                 $245, 255. 25
Amount allotted from War Department Appropriation                                                              Act ap-
  proved May 15, 1936-------------                                                                                                  200, 000. 00
         Amount to be accounted for_____--                                                                                      S445,        255. 25
Deductions on account of amount refunded_                                                                                                13, 688.97
         Net amount to be accounted for                                                                                    -_       431, 566. 28
Gross amount expended___________________                                                                 $464, 938. 56
Less reimbursements collected   --   -                                                                         38, 272. 01
                                                                                                                                    42           fi.

     Balance unexpended June 30, 1937__                                                                                                   4, 899. 73
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance ------------------------                                                                 --                45, 000. 00
  SExclusive       of available funds.

                                     15. MANASQUAN RIVER, N. J.

  Location.-This is a small stream located in the eastern part of
New Jersey, rising near Freehold and flowing to the Atlantic Ocean,
  RIVERS AND HARBORS-SECOND            NEW YORK, N. Y., DISTRICT      273

about 26 miles south of Sandy Hook. (See U. S. Coast and Geo-
detic Survey Chart No. 1216.)
    Previous projects.-Adopted by River and Harbor Act of March
3, 1879. The cost and expenditures were $39,000 for new work and
$2,054.11 for maintenance, a total of $41,054.11. (For further details
see Annual Report for 1909, p. 186.)
    Existing project.-This provides for the opening of Manasquan
Inlet and the provision of works designed to secure a channel at least
8 feet deep at mean low water. It also provides for a widening of
the present channel to same depth on its northerly side by dredging
an area approximately 200 feet wide by 3,150 feet long. The mean
tidal range in the ocean opposite the inlet is 3.8 feet. ' The mean tidal
range in the easterly lagoon is about 2 feet.
    The estimate of cost for new work, revised in 1935, is $646,000,
exclusive of amount expended on previous projects, but including
$300,000 contributed by local interests. The latest (1935) approved
estimate for annual cost of maintenance is $20,000.
    The existing project was authorized by the River and Harbor Act
approved July 3, 1930 (H. Doc. No. 482, 70th Cong., 2d sess.); and
widening of the channel on its northerly side was authorized by the
River and Harbor Act approved August 30, 1935 (Senate Committee
Document, 74th Cong., 1st sess.). The project documents contain
the latest published maps.
    Local cooperation.-Fully complied with.
    Terminal facilities.-No docks, wharves, or terminals suitable for
commercial purposes have been established. There are many small
boat landings.
    Operations and results during fiscal year.-Preliminary surveys
were made to determine the extent of new work required for the
following items of work: Northerly extension of bulkhead above
oceanfront at Manasquan Beach, dredging anchorage area and con-
struction of bulkhead and groin at Manasquan River, N. J. Total
costs of preliminary surveys were $1,282.63, all for new work. A con-
tract for dredging to widen the channel up to 200 feet on its north-
erly side for a length of about 3,150 feet and for maintenance of
the existing channel was commenced on May 10, 1937, and was in
progress at the close of the fiscal year. The cost for the year was
 $25,680.58 of which $22,547.79 was for new work and $3,132.79 for
maintenance.
    A contract for maintenance to restore the stone jetties to project
dimensions was commenced on September 29, 1936, and completed on
April 27, 1937. The cost was $115,103.12 for maintenance.
    A contract for maintenance to restore the bulkheads at the westerly
end of the stone jetties, 950 lineal feet on the north side and 650 lineal
feet on the south side, was commenced on August 3, 1936, and com-
pleted on April 30, 1937. The cost was $80,852.74 for maintenance.
    Total costs of all work during fiscal year were $222,919.07, of which
 $23,830.42 was for new work and $199,088.65 for maintenance. Total
expenditures were $209,556.64.
     Condition at end of fiscal year.-WVork under the existing project
  is about 95 percent completed. Two ietties of an aggregate length
  of 2,260 feet are completed, the north jetty being 1,230 feet long and
274              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the south jetty 1,030 feet long. Steel bulkheads 950 feet long at the
inshore ends of the north and south jetties are completed, and a
channel connecting with the State of New Jersey channel at a point
700 feet easterly of the New York & Long Branch Railroad bridge
has been dredged easterly for a distance of 4,225 feet, 300 feet wide
and 8 feet deep, and thence narrowing to 250 feet, with depth of
10 feet to the 10-foot curve in the ocean, a distance of about 875 feet.
The controlling depth on June 30, 1937, was 7 feet at mean low
water, to a point 700 feet easterly of the railroad bridge. The con-
tract for dredging now in progress will complete the project.
   The total cost of the existing project, excluding $300,000 con-
tributed funds which were expended for new work, were $292,206.12
for new work and $234,034.85 for maintenance, a total of $526,-
240.97. Total expenditures, excluding $300,000 contributed funds,
were $512,863.58.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1937, $27,215.20, together with an allotment of
$32,000 made during August 1937, total of $59,215.20, as follows:
                      --------------------------------------
Accounts payable____________       ____     ______            $13,377. 39
New work:
    Dredging under an existing contract to complete the area north-
      erly of the existing channel easterly of the New York & Long
      Branch R. R. bridge (July 1937) ---------------------------        6, 144.01
    Construction by contract of a steel sheet pile bulkhead about 500
      feet long and a steel sheet pile groin about 300 feet long north-
      erly of the existing steel bulkhead and groin at Manasquan
      Beach (August to December 1939) -------------------------         38, 000. 00
Maintenance: Dredging under an existing contract to restore project
  dimensions of the approved project------------------------------1,        693.80
       Total----- ----------------------------------------------        59, 215. 20
  The additional sum of $20,000 can be profitably expended during
the fiscal year 1939, for maintenance dredging to restore project
dimensions where shoals occur periodically. The work will be done,
by contract, during May and June 1939.
                                                       Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                                        $331, 206. 12
Cost of maintenance to June 30, 1937---_________-____________                                                          236, 088.96
      Total cost of permanent work to June 30, 1937
                                                  ---- ____- ___                                                       567, 295. 08
Minus accounts payable June 30, 1937-------------------------                                                           13, 377. 39
      Net total expenditures----------------------------------                                                         553, 917. 69
Unexpended balance June 30, 1937_          --
                                     - ____--_______                                                                    27, 215. 20
      Total amount appropriated to June 30, 1937 ______________                                                       1581, 132. 89
   1 In addition, $300,000 expended from contributed funds.


           Fiscal year ending June 30                             1933          1934             1935          1936          1937


Cost of new work--------..                 $51, 623. 37
                           .....------------.......                             $293. 00    ------------       $292. 09    $23,830.42
Cost of maintenance____ ._   -_............
                                - _            ........                          273. 56     $14, 228. 97       662. 33    199, 088. 65

      Total cost_...... ..                ..        .....____   51, 623.37       566. 56      14, 228. 97       954.42     222, 919.07'

                         ______
Total expended----------------                                  49,748.46     2, 401.04       14, 307. 05       939. 46    209, 556. 64

Allotted    .....................---------------------------    58, 436. 21   13, 997. 57     15, 000. 00   171, 000. 00   35, 570.00
   RIVERS AND HARBORS-SECOND                                    NEW YORK, N. Y., DISTRICT                              275
Balance unexpended July 1, 1936_ _       ____________                                                    $201, 201. 84
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936_____ _______-----$16, 760. 06
Amount allotted from War Department Appropria-
  tion Act approved May 28, 1930________-----------   16, 009. 30
Amount allotted from War Department Appropria-
  tion Act approved February 23, 1931--------------    2, 800. 64
                                                                                                              35, 570. 00

      Amount to be accounted for__--_----------------------                                               236, 771. 84
Gross amount expended                                $211, 422.90
Less reimbursements collected__--_-------------___      1, 866. 26
                                                                                                          209, 556.64

       Balance unexpended June 30, 1937                                                      __
                                                                                          _______-_ 27, 215. 20
,Outstanding liabilities June 30, 1937___--------                                    $1, 146. 92
Amount covered by uncompleted contracts______                                         16, 153. 60
                                                                                                              17_    00) 52

         Balance available June 30, 1937__________---------                                                    9, 914. 68
Amount allotted during fiscal year 1938________________________                                               32, 000.00

     Balance available for fiscal year 1938________________                                                   41, 914. 68
.Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 2--- __-___                                                                       20, 000. 00
  2 Exclusive of available funds.


   16. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                  (GENERAL)

  The cost of the work during the year amounted to $26,596.62. The
expenditures were $26,444.38. The balance unexpended at the end of
the fiscal year, together with an allotment of $17,000 made in July
1937, will be applied as needed during the fiscal year 1938 to payment
of expenses incurred under this heading. The additional sum of
$17,000 can be profitably expended during the fiscal year ending June
30, 1939.
                                   Cost and financial summary

Cost of new work to June 30, 1937_                                                                       -----------
Cost of maintenance to June 30, 1937 _____-------------------                                            $414, 360.42

         Total cost of permanent work to June 30, 1937------- -----  414, 360. 42
:Minus   accounts payable June 30, 1937 ----------------------------      402.25

      Net total expenditures--------------
TJnexpended balance June 30, 1937
                                                                                _____                     413, 958. 17
                                     ______________________                                          _         728.16

         Total amount appropriated to June 30, 1937______________                                         414, 686. 33


         Fiscal year ending June 30                 1933            1934           1935           1936               1937

Cost of new work  ---------------
Cost of maintenance-.------------------$113, 395.87              $46, 537. 98   $46, 524. 66   $25, 300. 09     $26, 596. 62
Total expended__---------      _------------- 110, 858. 23        46, 225. 35    46, 283.33     25, 981. 66         26, 444.38
Allotted_____---       ___      ..------------.- 130, 628. 79     60, 357. 54    27, 000.00     38, 000.00..........
276              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936_--------------------------            $27, 172. 54
Gross amount expended____-- ---------------        $27, 470.91
Less reimbursements collected--                       , 026. 53
                                                     1-------------------
                                                                        26, 444.38
      Balance unexpended June 30, 1937 -------------------                                                                          728. 16
Outstanding liabilities June 30, 19'37 -----------------------                                                                      402.25

     Balance available June 30, 1937_ __________________- _                                                                         325.91
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------                                                                       17, 000. 00

     Balance available for fiscal year 1938                                                                                         325. 91
                                                                                                                                1--------------------7,
Amount that can be profitably1 expended in fiscal year ending June
                                -
30, 1939, for maintenance ________________                     ___                                                             17, 000.00
   1Exclusive        of available funds.

17. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                         [Commercial statistics for these projects are given in pt. 2 of report]

                                                                         For last          Cost and expenditures to              Estimated
                                                                     full report                 June 30, 1937                   amount re-
                      Name of project                                see annual                                                  quired
                                                                                                                                 quired to
                                                                       report                                                     c
                                                                        for-               New work       Maintenance             complete


1. Cheesequake Creek, N. J.1--                   ----         _            1928                $40, 000        $24, 956.69            $50, 000
2. Matawan Creek, N. J.1                   _        ______ ___ _           1934                 21, 000         73, 964.09             12, 000

  1 Channel adequate for commerce.

     18. PLANT ALLOTMENT FOR SECOND NEW YORK, N. Y., DISTRICT

                                               Cost and financial summary
Undistributed costs June 30, 1937_________________--                                                                            $22, 434. 40
Plus accounts receivable June 30, 1937---------------- ---                                                                       31, 053. 46

      Gross total costs to June 30, 1937------------------------                                                                53, 487. 86
Minus accounts payable June 30, 1937---_--_-- -__--                                                                              8,783. 63
     Net total expenditures --------------------------------                                                                    44, 704. 23
Unexpended balance June 30, 1937-----------------------                                                                         23, 405.31
           Total amount appropriated to June 30, 1937----------------68,                                                            109. 54

           Fiscal year ending June 30                             1933              1934           1935             1936             1937


Total expended---------------------............................--------------------            $11, 526. 92      $49, 669. 43 -$16, 492. 12
Allotted-----........-------------------------------.......                 ------------         14, 109. 54      71, 000. 00     -17, 000. 00


Balance unexpended July 1, 1936
Amount 'allotted from War Department
                                                                    _____________    __________
                                                                         Appropriation Act ap-
                                                                                                                                23, 913. 19
proved May 15, 1936______                                                                                                      23, 000.00

     Amount to be accounted for    ---------------------------                                                                  46, 913. 19
Deductions on account of revocation of allotment_--                                                                             40, 000. 00

      Net amount to be accounted for ... __ ____-_________ -__                                                                    6, 913. 19
Gross amount expended------------------------ $383, 959. 52
            RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                  277
Less:
    Reimbursements collected-----------                                   $400, 300. 47
    Receipts from sales--
                       _____________                                            151. 17
                                                                                S-      $400, 451. 64
                                                                                                  -               -$16, 492. 12
      Balance unexpended June 30, 1937------------------------                                                      23, 405. 31
Outstanding liabilities June 30, 1937 ---------      ----------                                                      9, 055. 33
     Balance available June 30, 1937_________________----------                                                      14, 349. 98
Accounts receivable June 30, 1937_-------------------------------                                                    31, 053. 46

         Unobligated balance available June 30, 1937---------------                                                 45, 403. 44
Status of reports called for by river and harbor acts and committee resolutions

                                                                 Transmitted                                       Recommenda-
         Locality              Authorization acts                to Congress                  Document no.             tion


Delaware    and Raritan       River and Harbor Act, --------------.-------------
  Canal, N. J.                     Aug. 30, 1935.
Great Kills, Staten Is-       Rivers and Harbors .                      --------------------------
land, N. Y.                   Committee resolu-
                               tion, June 24, 1937.
    Do--_-_,-...........      River and   Harbor Act, ..-
                                     26,----
                                   Aug. 26, 1937.
Keyport Harbor, N. J_--       River and Harbor Act, ...---                          -------------------
                               Aug. 30, 1935.
Lemon Creek, N. Y.__--        Rivers and Harbors     May 5, 1937                        Rivers and Harbors         Favorable.
                               Committee resolu-                                          Committee, 27, 75th
                               tion, June 3, 1935.                                        Cong., 1st sess.
Manasquan Inlet, N. J.,       River and Harbor Act, Aug. 26, 1936                       House, 71, 75th Cong.,     Unfavorable.
and adjacent beaches,         July 3, 1930.                                              1st sess.
beach erosion.
Matawan Creek, N. J.--       Rivers and Harbors .                         ---------------------
                               Committee resolu-
                               tion, Jan. 24, 1936.
New York Bay-Dela-           Senate Committee res---                         ------------------------
  ware River section of        olution,   Dec. 15,
  Intracoastal  Water-         1936.
  way.
Passaic River, N. J.         Flood        Control      Act, .-------------
  (preliinaryexamina-              May 6, 1936.
  tion for flood control).
Passaic River, N. J.,        River and Harbor Act,               Mar.      3, 1937-______.___         .........       Do.
  from 8th St. Bridge,             Aug. 30, 1935.
  Wallington to Passaic
  St. Bridge at Garfield.

Sandy Hook Bay, off _-               do_--------- _              July      8, 1937      House,   292,     75th    Favorable.
  Atlantic Highlands,                                                                    Cong., 1st sess.
  N. J., to provide an
  anchorage area.
Shairk River, N. J _-----...--..     do                 -------------.--------------
Way Cake (Waackaack) ...-            do----------.--------                -------------------
  Creek, N. J.




      IMPROVEMENT OF RIVERS AND HARBORS IN THE
             PHILADELPHIA, PA., DISTRICT
  This district includes the watershed drained by the Delaware and
Schuylkill Rivers, embracing the eastern part of Pennsylvania, a small
area in southeastern New York, the shore lines and tributaries of
Delaware River and Bay, and the streams, bays, and inlets along the
Atlantic coast from Bayhead, N. J., at the head of Barnegat Bay on
the north to the Delaware-Maryland State line on the south.
  District Engineer: Lt. Col. John C. H. Lee, Corps of Engineers.
  Division Engineer: Col. E. D. Peek, Corps of Engineers.
278      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                  IMPROVEMENTS

                                     Page                                         Page
1. Delaware      River   between           15. Indian River Inlet and Bay,
       Philadelphia,    Pa.,   and                D el_- _ - - - - -        -_    318
       Trenton, N. J-_________       278    16. Inland Waterway from Chin-
2. Delaware River, Pa., N. J.,                   coteague Bay, Va., to Del-
       and Del., Philadelphia,                    aware Bay, Del _________        319
       Pa., to the sea___            284    17. Cooper River, N. Ij .-            321
3. Delaware River at Camden,               18. Big Timber Creek, N. J ...        322
       N. J-------------------       287    19. Woodbury Creek, N. J .-           323
                       --.....
4. Schuylkill River, Pa
5. Wilmington Harbor, Del --
                                     289
                                     292
                                            20. Mantua Creek, N. J ____
                                            21. Oldmans Creek, N. J   --....      324
                                                                                  326
6. Inland Waterway from Dela-              22. Raccoon Creek, N. J ..--          327
       ware River to Chesapeake             23. Salem River, N. J__               329
       Bay, Del. and Md _ _ _    _   295    24. Cohansey River, N. J   -----      331
7. Smyrna River, Del                305
                                     307
                                            25. Cold Spring Inlet, N. J ----
                                            26. Absecon Inlet, N. J .......
                                                                                  333
                                                                                  334
8. Little River, Del___
                        --...
9. St. Jones River, Del_            308    27. Absecon Creek, N. J               336
10. Murderkill River, Del .....      310    28. Tuckerton Creek, N. J ....        337
                        --....
11. Mispillion River, Del            311    29. Barnegat Inlet, N. J ......       339
12. Broadkill River, Del_....        313    30. Examinations, surveys, and
13. Harbor of Refuge, Delaware                    contingencies (general)   ---   340
       Bay, Del_                     314    31. Other projects for which no
14. Inland Waterway between                       estimates are submitted _       341
       Rehoboth Bay and Dela-               32. Plant allotment._---_..._         341
       ware Bay, Del_----------      316

       1. DELAWARE RIVER BETWEEN PHILADELPHIA, PA., AND
                                 TRENTON, N. J.

   Location.-This river has its source in southeastern New York, flows
in a general southerly direction, forming the boundary line between
the States of New York and New Jersey on the east and Pennsylvania
and Delaware on the west, and empties into Delaware Bay. (See U. S.
Coast and Geodetic Survey Charts Nos. 1218, 294, 295, and 296.)
   Previous projects.-Adopted by River and Harbor Acts of June
10, 1872; March 3, 1875; June 14, 1880; July 5, 1884; August 18,
1894; March 2, 1907; June 25, 1910; July 25, 1912; June 5, 1920; and
March 3, 1925. Total costs and expenditures were $3,041,893.91, of
which $2,489,173.45 was for new work and $552,720.46 was for mainte-
nance. For further details see page 1,778 of the Annual Report for
1915; page 311 of the Annual Report for 1924; and page 220 of the
Annual Report for 1934.
   Existing project.--This provides for a channel 28 feet deep at
mean low water and 300 feet wide from Allegheny Avenue, Phila-
delphia, Pa., to the Delair Bridge of the Pennsylvania Railroad Co.;
thence 25 feet deep and 300 feet wide to the upper end of the muni-
cipal terminal at Trenton, N. J. Above Delair, the project provides
for widening the channel at curves and for a turning basin at the
upper end 1,700 feet long and 500 feet wide and for maintaining
the channel dredged under the previous project to a depth of 12
feet at mean low water and a width of 200 feet from the upper
end of the 25-foot channel to the Pennsylvania Railroad bridge at
Ferry Street, Trenton. The project also provides for an auxiliary
channel 20 feet deep at mean low water and 200 feet wide east of
Burlington Island to extend from the main channel to the upper
end of the United States Pipe & Foundry Co.'s property at East
Burlington, with a turning basin 450 feet wide at the upper end,
and for the initial excavation only of a cross channel through ,the
       RIVERS AND HARBORS-PHILADELPHIA,         PA., DISTRICT    279
artificial island opposite Delanco, N. J., 200 feet wide and 8 feet
deep at mean low water (U. S. Engineer Department datum).
   The total length of the improvement is about 31.9 miles, including
1.4 miles in the auxiliary channel east of Burlington Island, and the
distance from the lower end to Liston Point, the accepted point of
division between Delaware River and Delaware Bay, is about 55
miles. The mean range of tide at Philadelphia is 5.6 feet and at
Trenton 6.0 feet, an increase of 0.5 foot since the completion of the
25-foot channel. The spring range is from 0.3 to 0.5 foot greater.
Freshets, which occur usually during February and March, attain
a height in the vicinity of Trenton of 9 to 20 feet above mean low
water, with a velocity of about 6 miles per hour. Freshets may
also occur at other seasons of the year, especially during the summer
months. Navigation is usually suspended during the winter months
on account of the formation of ice in the river.
   The estimate of cost for new work, revised in 1937, is $5,189,000,
exclusive of amounts expended on previous projects but including
$15,000 contributed by local interests. The latest (1935) approved
estimate for annual cost of maintenance is $131,000.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (Rivers and Harbors Committee Doc. No. 3, 71st
Cong., 1st sess.), which provided for a depth of 28 feet between
Philadelphia, Pa., and Delair Bridge. Deepening the channel from
Delair Bridge to Trenton to 25 feet, and dredging the auxiliary chan-
nel east of Burlington Island (Rivers and Harbors Committee Doc.
No. 11, 73d Cong., 1st sess., and No. 66, 74th Cong., 1st sess.) were
authorized by the River and Harbor Act approved August 30, 1935.
Prior to the River and Harbor Act of 1935, the 25-foot channel to
Trenton was provided for under the Public Works Administration
September 6, 1933, and the Emergency Relief Appropriation Act,
May 28, 1935. Excavation of the cross channel opposite Delanco,
N. J. (Rivers and Harbors Committee Doc. No. 90, 74th Cong., 2d
sess.), was authorized by the River and Harbor Act approved August
26, 1937. The latest published maps are in the Annual Report for
1914, page 1804; Rivers and Harbors Committee Document No. 3,
Seventy first Congress, first session; and Rivers and Harbors Com-
mittee Document No. 66, 74th Congress, first session.
  Local cooperation.-Fully complied with.
   Terminal facilities.-The facilities are considered adequate for
existing commerce. (For further details see Port Series No. 4, Corps
of Engineers, pt. I, revised 1932.)
   Operations and results during fiscal year-Public Works funds--
New work.-Government costs of $0.41 were incurred under contract
for new work dredging completed in prior fiscal year. The expendi-
tures were $21.84.
  Emergency Relief funds-New work.-Work was completed with
funds provided from the Emergency Relief Appropriation Act of
1935 under two contracts. Contract for dredging to 25 feet between
Florence, N. J., and Roeblihg, N. J., commenced on October 24, 1935,
was completed December 1, 1936, approximately 207,515 cubic yards
being removed under this contract at a cost of $127,624.03. The
contract for dredging to 25 feet between Roebling, N. J. and Tren-
ton, N. J., commenced on July 30, 1935, was completed on September
280     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

28, 1936, approximately 28,783 cubic yards being removed at a cost of
$16,407.05. The work of rock removal on Torresdale Range was
commenced by the U. S. derrickboat Rattler on August 3, 1936, and
completed on September 4, 1936. A total of 60 cubic yards of ledge
rock was removed at a cost of $5,481.18. Banking of disposal areas
used in connection with above contracts was done, by hired labor, at
a cost of $115,650.09.
   The total cost of new work with Emergency Relief funds was
$265,162.35. Total expenditures were $362,357.37.
   Regular funds--New work.-Contract for dredging to 20 feet in
the auxiliary channel east of Burlington Island commenced on July
17, 1936, was completed on February 23, 1937, approximately 671,988
cubic yards being removed at a cost of $214,129.25.
   Maintenance.-The contract for maintenance dredging of the 25-
foot channel between Philadelphia, Pa. and Florence, N. J. com-
menced on August 20, 1936, was completed on March 31, 1937. A to-
tal of 942,192 cubic yards were removed at a cost of $371,589.66.
   Maintenance dredging of the 25-foot channel at the upper end of
the project was commenced by the U. S. pipe-line dredge Alabama
on May 11, 1937, and was still in progress at the end of the year. A
total of 195,790 cubic yards were removed and pumped ashore into
disposal areas adjacent to the work at a cost of $40,086.37.
   Other maintenance costs during the year were operation and main-
tenance of tide gages $3,552.15, and surveys and channel examina-
tions $13,700.22.
   Total cost of work with regular funds were $643,057.65 of which
$214,129.25 was for new work and $428,928.40 was for maintenance.
Total expenditures were $627,963.65.
   The total cost, all funds, was $908,220.41 of which $479,292.01 was
for new work and $428,928.40 was for maintenance. Total expendi-
tures were $990,342.86.
   Conditionat end of fiscal year.-The existing project was completed
in 1937, except for the excavation of the cross channel opposite
Delanco, N. J.
   The latest examinations (March-June 1937) show depths less than
the project depth on or near the center line of the channels as fol-
lows: 24.4 feet on Beverly range (25-foot channel) and 10.1 feet on
Federal range (12-foot channel).
   The total costs and expenditures of the existing project from
Public Works funds were $2,189,955.51 for new work. The total
costs and expenditures of thlei existing project from Emergency
Relief funds were $2,619,844.07 for new work.
   The total costs of the existing project from regular funds were
$897,843.93, of which $301,289.44 was for new work and $596,554.49
was for maintenance. Total expenditures were $880,818.78.
   The total cost of the project, all funds was $5,707,643.51, of which
$5,111,089.02 was for new work and $596,554.49 was for maintenance.
Total expenditures were $5,690,618.36. In addition $15,000 contributed
funds were expended for new work.
   Proposed operations.-It is proposed to apply the funds unex-
pended and accounts receivable on June 30, 1937, under regular ap-
propriation amounting to $65,254.19, together with $150,000 allotted
from the act of July 19, 1937, as follows:
             RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                         281
Accounts payable June 30, 1937 ______________     _____              $27,840.98
Maintenance :
    Maintenance dredging in 28-foot, 25-foot, 20-foot,
      and 12-foot channels with Government plant as
      required throughout the year_______-----         $177, 413. 21
    Surveys, examinations and operation of tide
     gages--------    -------------------------------    10, 000. 00
                                                                     187, 413. 21
             Total-------------------------------------------------                                          215, 254. 19
  The maintenance dredging will insure full project depth in the
completed channels to Trenton and in the auxiliary 20-foot channel
east of Burlington Island.
  The funds unexpended on June 30, 1937, under Emergency Relief
appropriation, amounting to $2,895.93 were revoked in July 1937.
  The sum of $313,000 can be profitably expended during the fiscal
year 1939, as follows:
New work: Excavation of cross channel opposite Delanco, N. J., by Gov-
ernment pipe-line dredge (July-August 1938) ------------------        $63, 000
Maintenance: Maintenance dredging in 28-foot, 25-foot, 20 foot, and
  12-foot channels as required__                                       250, 000

          Total for all work------------------------------------------                                          313, 000
  The excavation of the cross channel opposite Delanco, N. J., will
complete the existing project.

                                         Cost and financial summary

                                 MAINTENANCE AND IMPROVEMENT FUNDS


Cost of new work to June 30, 1937__________________________                                            $4, 980,418. 40
Cost of maintenance to June 30, 1937___          _____ ___- -                                           1, 149,274. 95
                                                                                                        1_______

      Total cost of permanent work to June 30, 1937----------                                           6, 129, 693. 35
Undistributed costs June 30, 1937_ .__-_______        __----
                                                         -                                                  10, 814.83

      Net total cost to June 30, 1937______________--------                                             6, 140, 508. 18
Plus accounts receivable June 30, 1937------------------------                                                    1. 00

     Gross total costs to June 30, 1937---------------------6,                                               140, 509. 18
Minus accounts payable June 30, 1937-----------------------                                                   27, 840. 98

     Net total expenditures_________________________                                                    6, 112, 668. 20
Unexpended balance June 30, 1937----------------------------                                                65, 253. 19

         Total amount appropriated to June 30, 1937                                           -__________-
                                                                                                   16,177, 921.39

   Fiscal year ending June 30               1933              1934              1935            1936             1937


Cost of new work-_-- -_-_--      -....    $13, 478. 65 $1,016,355.32 $1, 041, 138. 49        $134, 391. 35     $214, 129. 66
Cost of maintenance--._...-...-.           22, 978. 25    123, 140. 45   109, 891.90          181, 850.04       428, 928. 40
       Total cost ----------------
                         _                 36, 456. 90   1,139, 495. 77    1,151,030. 39      316, 241.39       643, 058. 06
Total expended.....-----------------35,       345. 36      997, 949. 08    1, 196, 610. 43    416, 509. 95      627, 985. 49

Allotted- ---------- -----------           43, 000. 00   1, 235, 000. 00   1, 244, 955. 51    605, 000. 00      199, 000. 00

   1 Includes    $2,189,955.51 Public Works funds. In addition $15,000 of contributed funds
were expended.
282              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936_                _   __                                                       $494, 238.68
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936   -    __________________                                                               199, 000. 00
      Amount to be accounted for_                                                                             693, 238. 68
Gross amount expended-------------------------                                   $628, 009. 49
Less reimbursements collected_                                                          24. 00
                                                                                                              627, 985.49
      Balance unexpended June 30. 1937_______                                           _____                  65, 253. 19
Outstanding liabilities June 30, 1937_------- ---                                  27, 495.28
                                                                                  $__
Amount covered by uncompleted contracts                                                390. 70
                                                                                                               27, 885. 98
      Balance available June 30, 1937________________________                                                  37, 367.21
Accounts receivable June 30, 1937___                                                                                  1. 00

     Unobligated balance available June. 30, 1937_____________                                                 37, 368.21
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------                                                                        150, 000. 00

         Balance available for fiscal year 1938-----                               ---------                  187, 368. 21

Amount (estimated) required to be appropriated for comple-
  tion of existing project 2                                                                                   6---------3,
                                                                                                                   000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:                                                                                                63, 00 0. 00
   For new work 2- - - - - - - - - - - - - - ----   --
       For maintenance ---------------------                                                                  250, 000. 00

         Total 2-                            - - -- - - -- - -
                                                                 -----                                        313, 000. 00
  2 Exclusive of available funds.

                                           EMERGENCY RELIEF FUNDS


Cost of new work to June 30, 1937-----                                                                  $2, 619, 844.07
Cost of maintenance to June 30, 1937-----------

         Total cost of permanent work to June 30, 1937--                                    _____        2,619, 844. 07

Net total expenditures_  -----------------------------                                                   2, 619, 844. 07
Unex        balance June 30, 1937----------------------------
       cpended                                                                                                2, 895. 93

         Total amount appropriated to June 30, 1937------------2,622, 740. 00

   Fiscal year ending June 30               1933              1934             1935              1936             1937


Cost of new work-.-       ---
                         ________ _.....  _______.  --- _______---__---- . $2, 354, 681. 72 $265, 162. 35
Cost of maintenance           -------------.----------------------------   -------------- -------- --
Total expended___________-___                   _______-___                        ------   2, 257, 486. 70      362, 357. 37
Allotted..       -----------------------------------------               $2, 900, 000. 00    -185, 000. 00      -92, 260. 00


Balance unexpended July 1, 1936-                                                                             $457, 513.30
Amount allotted from Emergency Relief Appropriation Act of
                                     __
April 8, 1935 --------------------------------------------                                                     7, 740. 00

     Amount to be accounted for-----      -------------                                                       465, 253. 30
Deductions on account of revocations of allotment---__.-------                                                100, 000. 00

      Net amount to be accounted for-----------------------                                                   365, 253. 30
Gross amount expended----------------------$365, 952. 13
Less reimbursements collected-------------------- 3, 594. 76
                                                                                                              362, 357. 37
         Balance unexpended June 30, 1937 ----------------------                                                2, 895. 93
           RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                                              283

'CONSOLIDATED          COST   AND FINANCIAL SUMMARY                                   .FOR            DELAWARE              RIVER,    PHiL ADELIF.AIrIA
                                                                   TO TRENTON

Cost of new work to June 30, 1937_ _                                           ---                                                1   $7, 600, 262. 47
Cost of maintenance to June 30, 1937----                                                                                               1, 149, 274.95
      Total cost of permanent work to June 30, 1937           _                                                                        8,749,537 42
Undistributed costs June 30, 1937----------------------------                                                                             10, 814, 83.
         Net total cost to June 30, 1937                                       --------                         -                      8,760, 352. 25
Plus accounts receivable June 30, 1937--                                                                                                               1. 00

     Gross total costs to June 30, 1937                                                                                                 , 760, 353. 25
                                                                                                                                       8-----------------------
Minus accounts payable June 30, 1937-----------------------                                                                                27,840. 98

     Net total expenditures                                                                                                           18, 732, 512. 21
Unexpended balance June 30, 1937 ---------------------------                                                                               68, 149. 12

         Total amount appropriated to June 30, 1937 ....,-....-                                                                        8, 800, 661. 39

   Fiscal year ending June 30                           1933                  1934                       1935                 1936                 1937


Cost of new work__, .....           ___ .            $13, 478. 65 $1, 016, 355. 32 $1, 041, 138. 49 $2, 489, 073. 07                             $479, 292. 01
Cost of maintenance                                   22, 978. 25     123, 140. 45     109, 891.90      181, 850. 04                              428, 928.40

      Total cost           --
                   ------------                       36, 456. 90        1, 139, 495. 77         1, 151, 030. 39        2, 670, 923. 11           908, 220. 41

Total expended .--                                    35, 345. 36          997, 949. 08          1, 196, 610. 43        2, 673, 996. 65           990, 342. 86

Allotted.. __   . __    .........          _          43, 000. 00        1, 235, 000. 00        4, 144, 955. 51             420, 000. 00          106, 740. 00


Balance unexpended July 1, 1936-_                                                                                                          $951, 751.98
Amount allotted from War Department Appropriation Act ap-
   proved May 15, 1936 __--                                                 -----                         $199, 000. 00
Amount allotted from Emergency Relief Appropria-
   tion Act of April 8, 1935__---                                                                                   7, 740. 00
                                                                                                                                               206, 740. 00

      Amount to be accounted for_                                                                                       -              1,158, 491; 98
Deductions on account of revocations of allotm ents .                                                                        __           100, 000. 00

      Net amount to be accounted for-___-                                                      ------------                            1, 058, 491. 9:
Gross amount expended ____-- _-___-  --                                                           -       $993,961.62
Less reimbursements collected_                                                                                      3, 618. 76
                                                                                                                                               990,342..86
      Balance unexpended June 30, 1937__                                                                                                        68,.149. 12
Outstanding liabilities June 30, 1937_                                                                      $27, 495. 28
Amount covered by uncompleted contracts--------                                                                  390. 70
                                                                                                                                                27, 885. 98
         Balance available June 30, 1937___________________                                                                                     40, 263. 14
Accounts receivable June 30, 1937_______________________                                                                                              1.00
     Unobligated balance available June 30, 1937_                                                                                               40,264.14
Amount allotted from War Department Civil Appropriation Act
approved July 19., 1937 -_                                                                                                                    150, 000.00
     Balance available for fiscal year 1938_                                                                                               2   190, 264. 14;
Amount (estimated) required to be appropriated for completion
   of existing          project            -----------------------------------                                                                  63, 000.00
Amount that can be profitably expended in                                                fiscal year ending
   June 30, 1939:
      For new work 3                 -              ------------------                       ---------                                          63, 000.'00
      For maintenance 3                        --              -----------------                                                               250, 000. 00,
                   - - - - - - --        - - - - - - - - - - - - - -- - -- - ----- - - - -
         Total                                                                                    ------- ---                                  313, 000. 0(0
   1 Includes $2,189,955.51 Public Works funds.                                      In addition $15,000 of contributed funds
were expended.
    Includes $2,895.93 revoked in July 1937.
  * Exclusive of available funds.
284     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

2. DELAWARE    RIVER, PA., N. J., AND DEL., PHILADELPHIA, PA., TO
                              THE SEA

   Location.-See page 267, also United States Coast and Geodetic
Survey Charts Nos. 1218, 294, and 295.
   Previous projects.-Adopted by River and Harbor Acts of July
4, 1836; March 3, 1873; March 3, 1875; June 18, 1878; March 3, 1879;
July 5, 1884; August 11, 1888; and March 3, 1899. The total cost
and expenditures were $14,001,466.63, the cost of new work being
$12,976,057.61 and the cost of maintenance $1,025,409.02. For fur-
ther details see page 1779 of Annual Report for 1915.
   Existing project.-This provides for a channel from deep water in
Delaware Bay about 8 miles below Liston Point, to Allegheny Ave-
nue, Philadephia, a distance of about 63 miles, having a depth of
35 feet at mean low water and a width of 800 feet in the straight
parts, 1,200 feet at Bulkhead Bar, 1,000 feet at the other bends, and
1,000 feet in Philadelphia Harbor. The project includes the con-
struction of dikes for the regulation and control of the tidal flow
and dredging to provide for an anchorage 35 feet deep and about
6,400 feet long, at Port Richmond; for an anchorage area 30 feet
deep and about 3,500 feet long at Gloucester, N. J.; for an anchorage
35 feet deep and about 7,300 feet long in the vicinity of Mantua
Creek; and for an anchorage 35 feet deep, 1,200 feet wide, and
averaging 5,700 feet long at Marcus Hook, Pa.; for straightening the
channel and extending the 1,000-foot width from Philadelphia Har-
bor to Horseshoe Bend; and for the maintenance of any areas dredged
by local interests to a depth of 35 feet between the channel and a line
100 feet channelward of the pierhead line between Point House wharf
and the Philadelphia Navy Yard, when in the opinion of the Chief of
Engineers such areas are so located as to be of benefit to general
navigation.
   The mean range of tide at various points on the river and bay is
as follows: Philadelphia, Pa., 5.6 feet; Chester, Pa., 5.4 feet; New
Castle, Del., 5.5 feet; Liston Point, Del., 5.8 feet; and Lewes, Del.,
4.3 feet. Under the influence of heavy and long-continued winds the
range of tide may vary from about 4 feet below to about 10 feet above
mean .low water. Observations by the United States Coast and
Geodetic Survey extending over a number of years at Philadel-
phia, Pa., indicate that the mean tidal range has decreased about
0.7 foot and the elevation of mean low water has increased about 0.8
foot at that locality, as compared with the range and elevation
observed there in 1878 and earlier. The change is probably due to
the construction of regulating works in the river. A similar change
has been observed by the Engineer Department at other points on
the river above Liston Point.
   The estimate of cost for new work revised in 1935 was $17,600,000,
exclusive of amounts expended on previous projects. The latest
 (1933) approved estimate for annual cost of maintenance is
$1,500,000.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 733, 61st Cong., 2d sess.). It was
modified by the River and Harbor Act of July 3, 1930 (H. Doc. No.
       RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT             285

304, 71st Cong., 2d sess.), to provide for the anchorages between
Port Richmond and Mantua Creek, and for extending the 1,000-foot
channel width in Philadelphia Harbor to Horseshoe Bend; and by
the Public Works Administration September 6, 1933, and the River
and Harbor Act of August 30, 1935 (Rivers and Harbors Committee
Document No. 5, 73d Cong., 1st sess.), to provide for an anchorage
in the vicinity of Marcus Hook, Pa. The latest published maps are
in the annual report for 1913, page 1746, and in House Document
No. 304, Seventy-first Congress, second session.
   Terminal facilities.-There are 316 piers, wharves, and docks
within the limits of the improvement, exclhsive of those reported
under Wilmington Harbor, Del., including the following municipally
owned piers, open to public use: 1 at Gloucester, N. J.; 2 at Chester,
Pa.; 1 at New Castle, Del.; and 1 at Delaware City, Del.
   The terminal facilities are considered adequate for existing com-
merce and, with additional facilities under construction or contem-
plated, provide for substantial increase in the amount of commerce
which can be handled on this improvement. (For further details
see Port Series No. 4, Corps of Engineers, pt. I, revised 1932, and
pt. II, revised 1931.)
   Operations and results during fiscal year-Regular funds-Main-
tenance.-Maintenance dredging was in progress throughout the year
with the seagoing hopper dredge New Orleans, except during the
winter lay-up, and the dredge Delaware until September 13, 1936,
when the latter dredge was temporarily transferred to the Baltimore,
Md., district. The dredge Rossell was operated on the Delaware
River at intervals throughout the year when conditions in the Chris-
tiana and Schuylkill Rivers would permit. The total quantity of ma-
terial removed from the Delaware River during the year was 7,034,-
976 cubic yards, bin measurement, of which 1,061,919 cubic yards
were deposited in the rehandling basins at Edgemoor, Del.; 37,141
cubic yards in the basins at Hog Island; 3,018,283 cubic yards in the
Killcohook Basins; 1,303,100 cubic yards in Stony Point Basins; 690,-
765 cubic yards in the Oldmans Point Basins; 718,809 cubic yards in
the Naval Reserve Basin, League Island; and 204,959 cubic yards
were deposited into deep water outside channel without rehandling.
The cost of dredging, which includes rehandling by pipe-line dredges
and the proportionate share of cost of construction and maintenance
of disposal basins, was $839,878.23. In addition the pipe-line dredge
Alabama dredged approximately 1,054,302 cubic yards on Tinicum
Range, pumping material directly ashore at a cost of $116,014.89
   Other maintenance costs during the year include repairs to Pea
Patch Island dike, $2,380.05; surveys and channel examinations,
$29,244.93; operation and maintenance of tide gages below Phila-
delphia, $4,073.17; and' removing miscellaneous obstructions and
debris, $909.10.
   The total cost of work done during the year was $992,500.37 for
maintenance. Total expenditures were $988,866.45.
   Condition at end of fiscal year.-The existing project was completed
in 1934. Portions of the channel are subject to recurrent shoaling, but
according to the latest examinations (May-June 1937) a navigable
channel with a controlling depth of 35 feet at mean low water extends
286      REPORT OF CHIEF' OF ENGINEERS, U. S. ARMY, 1937

for a distance of 63 miles from Philadelphia to the sea. The total
length of dikes constructed under the project at Mifflin Bar, Chester
Island,. Oldmans Point, Edgemoor, Pea Patch Island, Reedy Island,
Alloway Creek, Stony Point, and Hope Creek, was 52,372 feet, ,Por-
tions of the dike at Reedy Island are in need of repairs.
   The total estimated quantity of material other than ledge rock
removed by contract in original channel dredging was approximately
54,001,483 cubic yards, excluding excessive overdepth dredging, In
addition, approximately 8,430,546 cubic yards were removed from
anchorages at Port Richmond, Gloucester, Mantua Creek, and Marcus
Hook. The total quantity reinoved by Government plant was approxi-
mately 2,829,986 cubic yards, making a total of 65,262,015 cubic yards
removed under the project. The total quantity of ledge rock and
boulders removed under the project was 145,418 cubic yards, by con-
tract, and 1,239 cubic yards by Government and leased plant.
   The total cost of the existing project from regular funds was $43.,
249,365.40, of which $17,021,228.20 was for new work and $26,228,-
137.20 was for maintenance.        The total expenditures have been
$44,985,290.21.
   The total cost and expenditures of the existing project from Public
Works funds was $813,045.79, all for new work.
   The total cost of the existing project, all funds, was $44,062,411.19,
of which $17,834,273.99 was for new work and $26,228,137.20 was for
maintenance. The total expenditures have been $45,798,336.
   Proposedoperations.-Itis proposed to apply the funds unexpended
and accounts receivable on June 30, 1937, amounting to $249,800.42,
together with $650,000 allotted from act of July 19, 1937, as follows:
Accounts payable June 30, 1937          -                           $114.22. 04
Maintenance :
   Operation of hopper dredges Delaware, New Or-
      leans, and Rossell; pipe-line dredges Alabama,
      Gillespie, Huston and attendant plant, as avail-
      able funds permit throughout the fiscal year___ $745, 571. 38
    Channel examinations and operation of tide gages
      to June 1938_--                                      40, 000. 00
                                                     -                     785, 571.38

          Total ----------------------         --    --------              899,800. 42
  Maintenance:dredging with Government plant will be continued as
far as available funds permit throughout the year, except during the
winter lay up, when annual repairs will be made.
  The sum of $1,550,000 can be profitably expended during the fiscal
year 1939, as follows:
Maintenance :
    Operation of hopper dredges Delaware, New Orleans and Ros-
      sell; pipe-line dredges Alabama, Gillespie, Huston and at-
      tendant plant as required throughout the fiscal year_ ___-_        -$1,   310, 000
    Dredging in lower Philadelphia Harbor, by contract as required_             200, 000
    Channel examinations, operation of tide gages and survey -__-                40, 000
          Total_                                                _ _         1, 550, 000
             RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                     287
                                            Cost and financial summary

Cost of new work to June 30, 1937____________-------------1 $30, 810, 331.60
Cost of maintenance to June 30, 1937------------------------- 27, 253, 546. 22
      Total cost of permanent worek to June 30, 1937 ____---58,                                                      063, 877. 82
Undistributed costs June 30, 1937_ ______________------------                                                     1, 830, 895. 78

      Net total cost to June 30, 1937___------ ---------------                                                   59, 894, 773. 60
Plus accounts receivable June 30, 1937------------------------                                                        19, 258.07

      Gross total costs to June 30, 1937_ ____- -----------                                                      59, 914, 031. 67
Minus accounts payable June 30, 1937_ _--_------------------                                                         114, 229. 04

     Net total expenditures ______-__-__ ---------------                                                         59, 799, 802. 63
Unexpended balance June 30, 1937-----------------------_----                                                         230, 542. 35

          Total amount appropriated to June 30, 1937_________                                                  160, 030, 344.98

     Fiscal year ending June 30                    1933              1934                  1935               1936            1937


Cost of new work ___             __________    $856, 717. 97     $583, 458. 78           $295 481. 67
Cost of maintenance       --------------      1, 935, 671.27    1, 083, 824. 29           888, 505. 33    $688, 886. 32   $992. 500. 37

                 .............
       Total cost----                   _     2, 792, 389. 24   1, 667, 283. 07         1, 183, 987. 00   688, 886. 32     992, 500. 37

Total expended ..----------------             2, 206, 260. 86   1, 455, 907. 73   -1,     831, 340. 49     747, 149. 96    988, 866. 45

Allotted________________________              2, 549, 552. 60   2,159, 140. 55    -2, 019, 000. 61         568, 700. 00    185, 231.33


Balance unexpended July 1, 1936_ _______-----                                                                    $1, 034, 177. 47
Amount allotted from War Department Appropriation Act ap-
   proved May 15, 1936--------------------_--                                                                         280, 000. 00

     Amount to be accounted for ________________                                                                  1, 314, 177. 47
Deductions on account of revocation of allotment____                                                                  94, 768. 67
      Net amount to be accounted for_                                                                             1, 219, 408. 80
Gross amount expended                         $1, 475, 821.23
Less reimbursements collected________________     486, 954. 78
                                                                                                                      988, 866.45
      Balance unexpended June 30, 1937                                                                                230, 542.35
Outstanding liabilities June 30, 1937_                                                                                116, 587. 79
     Balance available June 30, 1937-.....                                                                            113, 954.56
Accounts receivable June 30, 1937 --------------------------                                                           19, 258. 07
Unobligated balance available June 30, 1937       _                                                                  133, 212.63
Amount allotted from War Department Civil Appropriation
  Act approved July 19, 1937--------------------------------                                                          650, 000. 00
          Balance available for fiscal year 1938_______________ _                                                     783 212. 63
Amount that can be profitably expended in fiscal year end-
ing June 30, 1939, for maintenance 2________._______________                                                      1, 550, 000.00
   1 Includes $813,045.79 Public Works funds.
   2 Exclusive of available funds.

                             3. DELAWARE RIVER AT CAMDEN, N. J.

  Location.-Camden, N. J., is located on the east bank of the Dela-
ware River, directly opposite the city of Philadelphia, Pa. It is
about 55 miles above the mouth of the river and about 101 miles
          20196--37-pt. 1-              19
288      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

above the harbor of refuge at the mouth of Delaware Bay. (See
U. S. Coast and Geodetic Survey Chart No. 295.)
    Previous projects.-Adopted by River and Harbor Act of June
25, 1910. No work was done on this project. (For further details,
see p. 321, annual report for 1932.)
    Existing project.-This provides for dredging in front of Camden
to a depth of 18 feet at mean low water from that depth north of
Cooper Point to Berkley Street, and 30 feet from the latter point to
Newton Creek, these depths to extend from the 35-foot channel in the
Delaware River to a line parallel with and 50 feet distant from the
established pierhead line. The distance from Cooper Point to Berk-
ley Street is about 1.5 miles, and from Berkley Street to Newton
Creek is about 2.3 miles. The mean range of tide is 5.6 feet, and the
extreme range under the influence of prolonged heavy winds is from
about 4 feet below to about 10 feet above mean low water.
    The estimate of cost for new work, revised in 1930, was $480,300,
exclusive of $15,000 contributed by local interests. The latest (1930)
estimate for annual cost of maihtenance is $25,000.
    The existing project as adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 1120, 63d Cong., 2d sess.), provided for
the 18-foot channel and for a depth of 30 feet from Newton Creek
to Kaighn Point. The River and Harbor Act of July 3, 1930 (H.
Doc. No. 111, 70th Cong., 1st sess.), provided for extending the 30-
foot depth upstream to Berkley Street. The latest published maps
are in the project documents.
   Local cooperation.-Fully complied with.
    Terminal facilities.-Thereare 70 wharves within the limits of this
improvement, of which 67 are privately owned and operated. The
wharves on this portion of the Camden water front are included in
those described under the project for improving Delaware River from
Philadelphia to the sea. (For further details see Port Series No. 4,
Corps of Engineers, pt. I, revised 1932.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931, at a saving of $17,394 under the estimated cost. The
latest examination (April 1937) shows some shoaling along the pier-
head line below Kaighn Point and in front of the Camden marine
terminal, but not enough to require maintenance dredging at the
present time.
   The total costs and expenditures, excluding $15,000 contributed funds
which were expended for new work, have been $465,159.08, of which
$462,905.66 was for new work and $2,253.42 was for maintenance.
   Proposed operations.-No funds are available, and no work is con-
templated during the fiscal year 1938.
   The sum of $40,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging by contract, as required to re-
store the project depth between Kaighn Point and Camden marine
terminal.
            RIVERS AND HARBORS-PHILADELPHIA,                         PA., DISTRICT          289

                                   Cost and financial summary

Cost of new work to June 30, 1937------------------                              1 $462, 905. 66
Cost of maintenance to June 30, 1937--------------------------                         2, 253.42

      Total cost of permanent work to June 30, 1937------------ 465, 159. 08
Net total expenditures---------------------------------------   1465, 159.08
Total amount appropriated to June 30, 1937--------------------   465, 159 08

           Fiscal year ending June 30           1933      1934      1935      1936        1937

Cost of new work-------------------               --------------------------------------------
Cost of maintenance--......._-----_-_          -$329.97
Total expended.......-----------------------    329.97
Allotted       ------------------.---------------------------------------------------


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ------------- --------------------                        $40, 000. 00
   1In addition,      $15,000 of contributed funds was expended.

                                  4. SCHUYLKILL RIVER, PA.
   Location.-This river has its source in Schuylkill County, Pa., flows-
in a general southeasterly direction, and empties into the Delaware
River at Philadelphia, Pa. (See U. S. Coast and Geodetic Survey
Charts Nos. 295 and 280.)
   Previous projects.-Adopted by River and Harbor Act of July 11,
1870, and modified April 26, 1892. The total costs and expenditures
of all projects, prior to the adoption of the existing project,, which
was begun in 1918, were $525,000, all for new work. (For further
details see p. 325, annual report for 1932.)
   Existing project.-This provides for a channel 30 feet deep at
mean low water and 400 feet wide from Delaware River Channel to
Twenty-ninth Street, thence 30 feet deep and 300 feet wide to Passy-
unk Avenue Bridge, thence 26 feet deep and 200 feet wide to Gibsons
Point, and thence 22 feet deep and 200 feet wide to Cleveland Ave-
nue (now University Avenue), suitably widened at bends. The,
length of the section included in the project is about 6.5 miles. The
mean range of tide at Penrose Ferry Bridge is 5.6 feet, and at Chest-
nut Street, 6.0 feet. Freshets occur several times a year, and when
accompanied by heavy and prolonged winds have been known to
raise the water surface as much as 12 feet above mean low tide.
The currents produced by tides and freshets occasionally attain a
velocity of 6 miles per hour, the normal maximum velocity being
about 2 miles per hour.
   The estimate of cost for new work, revised in 1930, is $1,490,000,
exclusive of amounts expended on previous projects. Thee latest
 (1930) approved estimate for annual cost of maintenance is $200,000,
in addition to $1,300,000 required to restore the project depths between
the mouth and Passyunk Avenue Bridge.
   The existing project was adopted by the River and Harbor Act
of August 8, 1917 (H. Doc. No. 1270, 64th Cong., 1st sess.), and mod-
ified by the River and Harbor Act of July 3, 1930 (Rivers and Har-
bors Committee Doc. No. 40, 71st Cong., 2d sess.), to provide for a
channel depth of 30 feet instead of 35 feet between the mouth an4
Girard Point and for the restoration and maintenance of the chan-
290           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

nel below Passyunk Avenue by the United States under certain con-
ditions. See paragraph "Local cooperation." The latest published
map is in Rivers and Harbors Committee Document No. 40, Seventy-
first Congress, second session.
   Local cooperation.-The existing project, as originally adopted,
imposed the condition that the city of Philadelphia or the State of
Pennsylvania should maintain the improved channel until the com-
pletion of the city's projected sewage-treatment works. The River
and Harbor Act of July 3, 1930, provides for restoration and main-
tenance of the project from the mouth to Passyunk Avenue Bridge
by the United States in advance of the completion of the municipal
sewage=treatment works, provided the city of Philadelphia shall
-give assurances satisfactory to the Secretary of War and the Chief
of Engineers that it will dredge not less than 300,000 cubic yards
annually in maintaining the channel above Passyunk Avenue Bridge
and in cooperation with the United States in channel maintenance
below Passyunk Avenue. On December 23, 1930, the Secretary of
War approved an ordinance passed by the City Council of Philadel-
phia, and letter from the mayor giving assurance that the required
annual dredging will be done, as satisfactory compliance with the
project requirements for local cooperation.
   Terminal facilities.-There are 34 wharves located within the lim-
its of the improvement. These terminals are considered adequate for
existing commerce. (For further details see Port Series No. 4, Corps
of Engineers, Pt. I, revised 1932.)
   Operations and results during fiscal year.-The U. S. seagoing
hopper dredge Rossell was engaged at intervals in maintenance dredg-
ing between the mouth and Passyunk Avenue and removed approxi-
mately 709,736 cubic yards, bin measurement, at a cost of $121,732.35
for maintenance. Channel examinations were made, as required, dur-
ing the year at a cost of $9,904.01 for maintenance.
   The total cost of work done during the year was $131,636.36, all
for maintenance. The total expenditures were $161,396.21.
   Condition at end of fiscal year.-The existing project is approxi-
mately 98 percent completed. The total quantities removed in origi-
nal excavation under the project were 9,511.5 cubic yards, place meas-
urement, of ledge rock and 4,044,868 cubic yards, scow measurement,
of other material. The work remaining to be done to complete the
project is the removal of a few rock shoals in the channel above Passy-
unk Avenue, which will be deferred until the overlying mud shoals
are removed by the city of Philadelphia, as required by the project.
    Rapid shoaling of the portion of river included in the improvement
necessitates redredging at frequent intervals. The latest surveys
 (June 1937) show present controlling depths at mean low water avail-
able to navigation about as follows:

                                          Section                                                Project      Present
                                                                                                 depth        depth


                                                                                                  Feet         Feet
Mouth to Girard Point .-----------------------------                  ---------                          30        30. 7
Girard Point to Penrose Ferry Bridge----------------------------------------                             30        32. 2
Penrose Ferry  Bridge to Passyunk Ave .....-.-...........               ............ __ --. ..           30
                                                                                                         26        30. 0
                                                                                                                   16.0
Passyunk Ave. to Gibsons Point _       __ .            .  ..----- - - -        -

Gibsons Point to University Ave- ..-- .         ...--.-
                                                    .     ....---------------            ...             22        15. 2
               RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                           291
       The total cost under the existing project was $3,597,668.30, of which
    $1,456,001.01 was for new work and $2,141,667.29 for maintenance.
    Total expenditures were $3,590,950.87.
      Proposed operations.-Itis proposed to apply the funds unexpended
    on June 30, 1937, amounting to $11,049.13, together with $139,000
    allotted from act of July 19, 1937, as follows:
    Accounts payable June 30, 1937--7_---------------------------------                                                           $6, 717.43
    Maintenance :
       Dredging by Government hopper dredge Rossell,
          mouth to Passyunk Ave. Bridge, as required_ __- $135, 331. 70
       Channel examination as required throughout the
          year-----------------------------------------      8, 000.00
                                                                                                                                 143, 331. 70

             Total ---------------------------------------------------                                                           150, 049. 13
      The sum of $250,000 can be profitably expended during the fiscal
    year 1939 for channel maintenance, by contract and Government plant,
    from the mouth to Passyunk Avenue.
                                                   Cost and financial summary

    Cost of new work to June 30, 1937                                                 __                              $1, 981, 001. 01
    Cost of maintenance to June 30, 1937_--- ---                                      ___--------               ----- 2, 141, 667. 29

         Total cost of permanent work to June 30, 1937------------                                                         4, 122 668. 30
    Minus accounts payable June 30, 1937_                                                                                            717. 43
                                                                                                                                6,6---------------------__

         Net total expenditures___-----------____ ___ __    --_                                                            4, 115, 950. 87
    Unexpended balance June 30, 1937 ----------------------------                                                              11, 049. 13

             Total amount appropriated to June 30, 1937--------------                                                      4, 127, 000. 00

       Fiscal year ending June 30                      1933            1934                  1935                  1936               1937


    Cost of new work.----------
    Cost of maintenance--.....---------_            $265, 744. 44   $238, 885. 90         $273, 687. 55         $292, 625. 47
                                                                                                                                  -$131, 636. 36
    Total expended        ......----------------     298, 94. 44     234, 617. 51          293, 771. 05          257. 121. 62       161, 396. 21
    Allotted------------------------                 310, 000. 00    420, 000. 00          340, 000. 00          240, 000. CO      -108,00C0. 00


    Balance unexpended July 1, 1936 ------------                                                                                $280,445. 34
    Deductions on account of revocations of allotments -------------                                                             103, 000. 00
          Net amount to be accounted for                                                                                              445. 34
                                                                                                                                1--------------------------72,
    Gross amount expended-- ------- __-                                  --________                                             161, 396. 21
          Balance unexpended June 30, 1937                                            ----------------                            11, 049. 13
-
    Outstanding liabilities June 30, 1937                                                                                          6___________________
                                                                                                                                     , 717. 43
         Balance available June 30, 1937--------------------------                                                                 4, 331. 70
    Amount allotted from War Department Civil Appropriation Act
     approved July 19, 1937--------------       -----    ---------                                                               139, 000. 00
         Balance available for fiscal year 1938______--________-___                                                              143, 331.70
    Amount (estimated) required to be appropriated for completion
       of existing project 1________-------                                   -----                       ---                    34, 000. 00
    Amount that can be profitably expended in fiscal year ending
                                                            - -
     June 30, 1939, for mantenance 1-      ______-___                                                                            250, 000. 00
     1Exclusive of available funds.
292     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                   5. WILMINGTON    HARBOR, DEL.

    Location.-This harbor is formed by the Christiana River, which
rises in New Castle County, Del., flows northeasterly 16 miles, pass-
ing through the city of Wilmington. Del., and empties into the Dela-
ware River about 29 miles below Philadelphia, Pa. (See U. S. Coast
and Geodetic Survey Chart No. 294.)
    Previous projects.-Work was done on the Christiana River from
1836 to 1838. The original project was adopted by River and Harbor
Act of July 11, 1870, and modified by River and Harbor Acts of
March 3, 1881, and July 5, 1884. The costs and expenditures were
$402,121.21 for new work. For further details see page 1785 of
Annual Report for 1915.
    Existing project.-This provides for a harbor at the mouth of the
river, with an entrance channel 30 feet deep at mean low water and
400 feet wide :an inner basin of the same depth approximately 4,400
feet long, and averaging 600 feet in width, or about 70 acres in area,
and extending upstream from the entrance channel at the mouth of
the river to the Lobdell Canal. From the Lobdell Canal provision
is made for a channel extending upstream 21 feet deep at mean low
water and 250 feet wide to the mouth of the Brandywine River, a
distance of 1.6 miles from the mouth of the Christiana, thence 200
feet wide to the pulp works, 4 miles above the mouth, thence decreas-
ing to a depth of 10 feet to the Philadelphia, Baltimore & Washing-
ton Railroad bridge No. 4, thence decreasing to a depth of 7 feet and
a width of 100 feet to Newport, Del., 83/4 miles above the mouth, and
for the construction of two jetties at the mouth of the Christiana
River and one at the mouth of' the Brandywine River. The north
jetty, as originally constructed, was a curved, stone-filled pile and
timber crib 2,150 feet long. Under the modification of this jetty
authorized by the act of July 3, 1930, the outer end, about 1,200 feet
in length, has been removed to improve the channel regimen. Thee
jetty at the mouth of the Brandywine is also a stone-filled pile arid
timber crib V-shaped, 430 feet long on the Brandywine side, and 260
feet long on the Christiana side. The section included in the project
is about 9 miles long, including about 1,800 feet outside the mouth.
The mean range of tide is 5.4 feet at the mouth and 5.4 feet at New-
port. Under the influence of prolonged heavy winds the range of
tide may vary from about 2 feet below to about 11 feet above mean
low water.
    The estimate of cost for new work, revised in 1935 to include the
cost of the south entrance jetty, was $1,197,700, exclusive of amounts
,expended on previous projects. The latest (1930) approved estimate
for annual cost of maintenance is $281,000, of which $152,000 is the
:estimated cost for annual maintenance of the 30-foot channel.
   'The existing project was adopted by the following river and har-
bors acts: The act of June 3, 1896, as modified by the act of March
3, 1899, provided for depths of 21, 10, and 7 feet, and for jetties
 (H. Doc. No. 66, 54th Cong., 1st sess.; Annual Report for 1896, p.
973; and Annual Report for 1897, p. 1250) ; act of July 25, 1912, pro-
vided for the purchase or construction of a dredge and auxiliaries,
including a wharf and depot, for maintenance of the project (H. Doc.
No. 359, 62d Cong., 2d sess.); act of September 22, 1922 (H. Doc. No.
114, 67th Cong., 1st sess.), amended by the act approved March 3, 1925
       RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT               293

  ('Senate committee print, 68th Cong., 1st sess.), provided for the en-
trance channel and basin 25 feet deep and construction of new south
jetty; and the act of July 3, 1930, provided for a depth of 30 feet
between the Delaware River and the Lobdell Canal and authorized
the modification or removal of a portion of the north jetty (Rivers
and Harbors Committee Doc. No. 20, 71st Cong., 2d sess.). Modifi-
  cation of the project to provide for completion of the new south jetty
by the United States (Rivers and Harbors Committee Doc. No. 32,
73d Cong., 2d sess.) was authorized May 28, 1935, under the Emer-
gency Relief Appropriation Act of 1935, and by the River and Har-
bor Act approved August 30, 1935.
    The latest published map of the entire harbor is in House Docu-
ment No. 66, Fifty-fourth Congress. first session. A map of the 25-
foot section of the harbor is published in House Document No. 114,
Sixty-seventh Congress, first session, and of the 30-foot section in
Rivers and Harbors Committee Document No. 20, Seventy-first Con-
gress, second session.
    Local cooperation.-Fully complied with.
    Terminal facilities.-A marine terminal to serve ocean and coast-
wise vessels was completed in 1923 by the harbor commission of
Wilmington with warehouses and freight-handling devices and
directly connected with all railroads entering the city. There is also
a practically continuous series of wharves or terminals on both sides
of the Christiana River from the plant of the American Car &
Foundry Co. to the Jessup & Moore Paper Co., a total length of
about 2 miles. The harbor facilities consist of wharves, marine rail-
ways, drydocks, shipyards, and terminal warehouses equipped with
handling appliances. (See Port Series No. 4, Corps of Engineers.)
    Operations and results during fiscal year--Emergency Relief
funds.-Work under contract covering the construction of a steel
sheet pile jetty on the south side of Wilmington Harbor, extending
approximately 2,300 linear feet parallel to and 100 feet south of the
southerly limit of Wilmington Harbor, in progress at end of last
fiscal year, was completed July 31, 1936. The costs during the fiscal
year were $13,123.35, for new .work. The expenditures were
$35,280.68.
    Regular funds.-The U. S. dredge Rossell was engaged at intervals
in maintenance dredging between deep water in the Delaware River
and the Wilmington Marine Terminal (Lobdell Canal), approxi-
mately 1,629,176 cubic yards, bin measurement, being removed, at a
cost of $184,882, for maintenance. Repairs were made to jetty, by
hired labor, at a cost of $24,867.46, for maintenance. Channel ex-
aminations were made as required during the year, at a cost of
$7,364.56, for maintenance. The total cost of maintenance was $217,-
114.02. The expenditures were $199,353.34.
    The total cost of work, all funds, was $13,123.35 for new work and
$217,114.02 for maintenance, a total of $230,237.37. Total expedi-
tures were $234,634.02.
    Condition at end of fiscal year.-About 99 percent of the existing
project has been completed. The remaining portion is the deepen-
ing of the inner basin approximately 4,400 feet long and from 400
to 600 feet wide to a depth of 30 feet. The controlling depths at
mean low water were as follows: From Delaware River to Lobdell
294      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Canal, 31.7 feet (May 1937); thence to Market Street Bridge, 14.4
feet; thence to the pulp works, 13.3 feet; thence to the Pennsylvania
Railroad bridge No. 4, 8.8 feet; thence to 1,000 feet upstream from
the highway bridge at Newport, 6.2 feet (September 1936).
   The total cost and expenditures of the improvement from Emer-
gency Relief funds were $205,500.
   The total cost of work with regular funds, excluding $60,000 con-
tributed by the city of Wilmington, which was expended for main-
tenance, was $4,288,858.31, of which $924,356.12 was for new work
and $3,364,502.19 for maintenance. Total expenditures were $4,269,-
832.80 exclusive of $60,000 contributed funds.
   The total costs, all funds, excluding $60,000 contributed funds, was
$4,494,358.31, of which $1,129,856.12 was for new work and $3,364,-
502.19 for maintenance. Total expenditures were $4,475,332.80, ex-
clusive of $60,000 contributed funds.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1937, amounting to $20,495.99 together with
$150,000 allotted from the act of July 19, 1937, as follows:
Accounts payable June 30, 1937 ____________________________--         $19, 025.51
Maintenance :
    Repairs to Island No. 9 South Jetty, by contract (August-
      September 1937) ------------------------------------------ 25, 000. 00
    Maintenance dredging by contract between Pennsylvania R. R.
      bridge (Delaware Division) and Newport, Del.           (August-
      November 1937) -- _--------------------- --------                20, 000.00
    Maintenance dredging by hopper dredge Rossell and attendant
      plant between the mouth and Lobdell Canal, throughout the
      year______---_--_--                                             101, 470.48
    Channel examinations throughout the year__          _________--     5, 000. 00

            Total----------------------------------------------             170, 495.99
  The Rossell will be operated during six or more periods of about
2 weeks each distributed approximately uniformly throughout
the fiscal year.
  The sum of $180,000 can be profitably expended during the fiscal
year 1939, as follows:
Maintenance :
    Maintenance dredging by hopper dredge Rossell and attendant
      plant from the mouth to Lobdell Canal throughout the year___ $170, 000
    Maintenance of south jetty, by hired labor __-----------___
                                                 --                   5, 000
    Channel examinations throughout year-----------------------       5,000
            Total-------------------------------------------------              180, 000

                             Cost and financial summary
Cost of new work to June 30, 1937--------------------------_         1$1, 531, 977. 33
Cost of maintenance to June 30, 1937________ _____________             23, 364, 502. 19
     Total cost of permanent work to June 30, 1937----------              4, 896, 479. 52
Minus accounts payable June 30, 1937_------------------                       19, 025.51
      Net   total expenditures___-------       ____________     __   124, 877, 454. 01
Unexpended balance June 30, 1937_ _ __         ______________    _           20, 495. 99
      Total amount appropriated to June 30, 1937-------------        12   4, 897, 950. 00
  1Includes $205.500 emergency relief funds.
  2In addition $60,000 of contributed funds was expended.
               RIVERS AND HARBORS--PHILADELPHIA, PA., DISTRICT                                                               295

     Fiscal year ending June 30                    1933            1934             1935                1936              1937


Cost of new work_           ____..---------         --------------                                   $192, 376. 65
                                                                                       ..--------------                  $13, 123. 35
Cost of maintenance..---------..........    $201, 703. 87  $118, 858. 21        $129, 203. 51           89, 116. 25      217, 114.02
         Total cost --------------               201. 703. 87    118, 858. 21    129, 203. 51         281, 492. 90       230, 237. 37

Total expended--.......------------...........   214, 997. 08    142, 906. 21    106, 818.47          281, 119. 00       234, 634.02

Allotted_    -.-------------------               228, 000.00     286, 000. 00    197, 500.00          236, 500. 00        11, 000. 00


Balance unexpended July 1, 1936------------------------------   $244, 130. 01
Amount allotted from War -Department Appropriation Act approved
  May 15, 1936- ______    _____------------__            ------   11,000.00

      Amount to be accounted for-----------------------------                                                         255, 130. 01
Gross amount expended------------------------- --- $257, 345. 55
Less reimbursements collected----------------------- 22,711. 53
                                                                                                                      234, 634.02

            Balance unexpended June 30, 1937-------------------                                                        20, 495.99
Outstanding liabilities June 30, 1937_
                                     -----------                                             ------                    19, 031. 51

            Balance available June 30, 1937----                                                       ____              1, 464.48
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------                                                             150, 000.00

            Balance available for fiscal year 1938                                  --------------                    151, 464. 48

Amount (estimated) required to be appropriated for completion of
existing project -_________________________________ ------                                                            67, 850.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 3______-----------                                                                         180, 000. 00
    SExclusive of available funds.

6. INLAND                WATERWAY                 FROM          DELAWARE            RIVER             TO CHESAPEAKE
                                                   BAY, DEL. AND MD.

  Location.-The Chesapeake & Delaware Canal is a sea-level canal,
extending from Reedy Point on the Delaware River, about 41 miles
below Philadelphia, Pa., to the junction of Back Creek and Elk
River, about 4 miles west of Chesapeake City, Md., a distance of
about 19 miles, with a branch channel extending from Delaware City,
Del., for a distance of 1.8 miles to the junction with the main canal
from Reedy Point, Del. (See U. S. Coast and Geodetic Survey
Charts Nos. 294 and 1226.)
  Previous projects.-The River and Harbor Act of August 8, 1917,
made appropriation for preliminary studies with a view to taking
over the Chesapeake & Delaware Canal.
  The project adopted by the River and Harbor Act of March 2,
1919, provided for the purchase of the Chesapeake & Delaware
Canal at a cost to the United States not exceeding $2,514,289.70. Its
enlargement was authorized by the river and harbor acts of January
21, 1927, and July 3, 1930. For details of its enlargement see Annual
Report for 1934, page 242.
  The total costs and expenditures under the previous project includ-
ing $2,514,289.70 for the purchase of the canal were $10,709,755.01 for
new work and $4,373,167.12 for maintenance, a total of $15,082,922.13.
  Existing project.-This provides for a sea-level channel to ac-
commodate vessels drawing 25 feet and having a depth of 27 feet
296     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and a width of 250 feet from Delaware River to Elk River and
thence 400 feet wide down Elk Rivei and Chesapeake Bay to deep
water. at or near Pooles Island; alteration of existing bridges over
the canal; extension of the entrance jetties at Reedy Point; the en-
largement of the anchorage and mooring basin in Back Creek to
afford an area about 400 feet wide, 1,000 feet long, and 12 feet deep,
including provision of sluice gates at the fixed highway bridge;
dredging the Delaware City Branch Channel to a depth of 8 feet
and a width of 50 feet; deepening the existing basin to the same
depth; revetment of both banks east of Fifth Street Bridge; and
construction of bulkheads. The portion of" the channel extending
from the mouth of Back Creek, in Elk River, to Pooles Island, a
distance of 27 miles, is included in the Baltimore (Md.) district.
The length of the canal included in the Philadelphia district, ex-
tending from Delaware River to the mouth of Back Creek is about 21
miles.
    The mean range of the tide at Reedy Point, Jetties is 5.5 feet, and
at Chesapeake City, Md., 2.3 feet. The extreme range of tide is
from 4.8 feet above mean high water to 4.0 feet below mean low
water.
    The estimate of cost for new work, revised in 1935, is $14,000,000.
The latest (1935) approved estimate of cost for annual maintenance
is $328,000, including $108,000 for operation and care of the water-
way.
    The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 201, 72d Cong., 1st sess., and Rivers
and Harbors Committee Docs. Nos. 18 and 24, 73d Cong., 2d sess.).
The latest published map of the canal is found in Rivers and :Har-
bors Committee Document No 24, Seventy-third Congress, second
session. Operation and care of the canal and appurtenant works
were included in the project July 1, 1935, under the provisions of the
Permanent Appropriations Repeal Act approved June 26, 1934.
    Local cooperation.-Fully complied with.
    Terminal facilities.-A freight station is maintained at Chesapeake
City by the Baltimore & Philadelphia Steamboat Co., no charges for
wharfage being made. Ample mooring facilities at the eastern and
western ends of the canal and bulkheads at Delaware City and St.
Georges have been constructed by the United States. A harbor for
small boats has been provided and a wharf has been constructed at
Chesapeake City. The facilities are considered adequate for existing
commerce.,
    Operations and results during fiscal year (Philadelphia,Pa., Dis-
trict)--Emergency Relief funds-New Work-Contract.-The work
of deepening the canal to 27 feet was in progress during the year
under seven contracts, three for dry excavation above a plane 15 feet
above mean low water; two for dredging; one for alterations to exist-
ing highway bridges across the canal at Reedy Point, St. Georges, and
Summit, Del.; and one for reinforcing the south main pier of Summit
Bridge.
    Contract for dry excavation on the south side of the canal, from a
point 930 feet east of the Pennsylvania Railroad bridge to a point
7,400 feet west of Summit Bridge, in progress at the end of the last
fiscal year, was completed November 30, 1936. There were removed
       RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                 297
494,259 cubic yards, place measurement, of material at a cost of
$90,811.02.
   Another contract for dry excavation on the south side, from the
western terminus of the preceding contract to a point about 3,500'
feet west of Guthries Run, in progress at the end of the last fiscal
year, was completed November 4, 1936. There were removed 186,378
cubic yards, place measurement, of material at a cost of $33,567.99.
   A third contract for dry excavation on the north side of the canal,
from the Pennsylvania Railroad bridge to a point 6,000. feet west
of Guthries Run, in progress at the end of the last fiscal year, was
completed January 15, 1937. There were removed 1,471,493 cubic
yards, place measurement, at a cost of $276,565.52.
   Total cost of dry excavation was $400,944.53.
   Contract for dredging between Wattys Point and Courthouse Point,.
Md., in progress at end of last fiscal year, was completed November
7, 1936. There were removed 1,046,855 cubic yards, place measure-
ment, of material at a cost of $124,724.38.
   Contract for dredging and rock removal between Chesapeake City
and Wattys Point, in progress at end of last fiscal year, was com-
pleted May 17, 1937. There were removed 17.250 cubic yards, place
measurement, of rock and 1,107,527 cubic yards, place measurement,
of other material at a cost of $421,944.59.
   Total cost of dredging and rock removal was $546,668.97.
   Contract for reconstructing the highway bridges over the canal
at Reedy Point, St. Georges, and Summit, to strengthen the piers
and abutments against possible injury resulting from enlargement of
the canal prism, in progress at the end of the last fiscal year, was
completed March 11, 1937. Cost of work during the year was
$115,625.23.
   Work of reinforcing the south main pier of Summit Bridge was
commenced December 18, 1936, and was completed April 8, 1937, at
a cost of $47,785.85.
   Under contract dated March 15, 1935, field consultants were fur-
nished in connection with the above contracts for reconstructing high-
way bridges at a cost of $5,600. The contract was completed January
31, 1937.
   New work--Hired labor.-Model studies of the waterway by the
United States Waterways Experiment Station were continued and
completed during the fiscal year at a cost of $2,258.13. Work of re-
moving and relocating buildings at St. Georges and Reedy Point
bridges in connection with the alterations of these bridges, in progress
at the close of the last fiscal year, was completed at a cost of $2,209.44.
   Work of constructing areas for disposal of dredged material was
in progress during the year, at a cost of $680,060.25. Cost of land
acquired during the year in connection with this improvement was
$79,895.32.
   Total cost of work with Emergency Relief funds was $1,881,047.72,
all for new work. Total expenditures were $1,525,455.48.
   Regular funds-New work-Contract.-Work under contract for
dredging from Delaware River to St. Georges Bridge was commenced
July 23, 1936, and was 94 percent completed at the end of the fiscal
year. Approximately 5,762,088 cubic yards, place measurement, of
material was removed at a cost of $877,319.41.
298     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Work under contract for dredging from St. Georges Bridge to the
Pennsylvania Railroad bridge was commenced July 10, 1936, and was
85 percent completed at the end of the fiscal year. Approximately
4,128,544 cubic yards, place measurement, of material was removed at
a cost of $572,243.49.
   Work under contract for dredging from the Pennsylvania "Rail-
road bridge to Summit Bridge, in progress at close of last fiscal year,
was completed February 20, 1937. Approximately 2,067,147 cubic
yards, place measurement, of material was removed at a cost of
$568,616.17.
   Work under contract for dredging between Summit Bridge and a
point 1,500 feet east of Guthries Run was commenced December 1,
1936, and was 45 percent completed at the end of the fiscal year.
Approximately 1,176,827 cubic yards, place measurement, of material
was removed at a cost of $301,281.11.
   Work under contract for dredging from a point 1,500 feet east
of Guthries Run to Bethel, Md., was commenced October 30, 1936,
and was 92 percent completed at the end of the fiscal year. Approxi-
mately 2,566,174 cubic yards, place measurement, of material was re-
moved at a cost of $613,865.77.
   The total cost of dredging was $2,933,325.95.
   Construction of a timber box sluice under Fifth Street, Delaware
City, Del., was commenced October 30, 1936, and was completed May
8, 1937, at a cost of $13,030.95.
   Reconstruction of Pennsylvania Railroad bridge, under contract,
was commenced in February 1937, and was 46 percent completed at
the end of the fiscal year, at a cost of $133,607.82.
   New workl-Hired labor.-Construction of spillways and levees at
areas for disposal of dredged material was in progress during the
year, at a cost of $10,832.68.
   Total cost of new work was $3,090,797.40.
   Maintenance-Operating and care.-The highway bridges across
the waterway were operated and maintained throughout the year.
The cost was $102,734.29 for operation and $16,492.46 for ordinary
maintenance and repair, a total of $119,226.75.
   The total costs from regular funds were $3,090,797.40 for new work,
$119,226.75 for operating and care, and $160,546.53 for maintenance
chargeable to previous project, a total of $3,370,570.68. Total ex-
penditures were $3,043,995.73, including $160,546.53 chargeable to
previous project.
   The cost of work from all funds (Philadelphia, Pa., district) was
$4,971,845.12 for new work, $119,226.75 for operating and care, and
$160 546.53 for maintenance chargeable to previous project, a total
of $5,251,618.40. Total expenditures from all funds were $4,569,451.21,
including $160,546.53 chargeable to previous project.
   Baltimore, Md. district (section: Courthouse Point to Pooles Is-
land).-The work of dredging the approach channel to the Chesa-
peake & Delaware Canal in Chesapeake Bay from deep water oppo-
site Pooles Island to Courthouse Point on Elk River was commenced
by the U. S. dredge Navesink July 21, the U. S. dredge Absecon Au-
gust 25, the U. S. dredge Atlantic September 4, and the U. S. dredge
Delaware September 17, 1936. During the year there were removed
from the Pooles Island section 3,305,616 cubic yards of material bin
measure; from Still Pond section 2,310,895 cubic yards bin measure;
          RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT           299

from Sassafras River section 2,180,921 cubic yards bin measure; Pond
Creek section 2,802,674 cubic yards bin measure; Reybold Wharf
section 655,360 cubic yards bin measure and Town Point section
2.358,797 cubic yards bin measure, a total of 13,614,263 cubic yards bin
measure. A disposal area for reception of the present and future
dredging was prepared at Pearce Creek near the mouth of Elk River.
The area, together with a rehandling basin and approach channel,
were in operation at the close of the fiscal year. There were removed
by contract from the channel and rehandling basin, adjacent to the
disposal area, 1,520,459 cubic yards of material. A steel sheet pile
bulkhead breakwater was constructed by contract near the rehandling
basin, in which 25,699 square feet of steel sheet piling, 9,311 linear
feet of round wood piling, 33,785 feet of timber and 6,752 pounds -f
bolts, etc. were used. In preparing the disposal area 64 91 acres of
land were cleared by contract and 160 acres by hired labor; 79,277
cubic yards of earth dike were built and 73,559 cubic yards of ditches
were dug; 4,870 square yards of relocated macadam road were con-
structed in lieu of a section of road included in the disposal area; a:
culvert was built and road fill requiring the excavation of 3,917 cubic
yards of material in relocating the bed of the creek and for fill in
raising the road level was made at Pearce Creek near the upper end
of the disposal area; approximately 70,000 feet of steel wire fencing
were erected around the Pearce Creek disposal area and three timber
spillways were built. The total costs (Baltimore, Md., district), all
for new work, were $1,215,656.68 and the total expenditures were
 $1,056,715.30.
    The combined total costs for both districts during the fiscal year,
all funds, were $6,187,501.80 for new work, $119,226.75 for operating
and care, and $160,546 53 for maintenance charged to previous proj-
ects, a total of $6,467,275.08. The total expenditures were $5,626,-
166.51, including $160,546.53 chargeable to previous projects.
    Condition at end of fiscal year.-The existing project as a whole
is about 63 percent completed. That part of the project included in
the Philadelphia, Pa., district is 73 percent completed. The work
remaining to be done in this portion is completion of dredging, under
contracts in force, from Delaware River to Bethel, Md.; completion
of alteration of Pennsylvania Railroad bridge; dredging under Penn-
sylvania Railroad bridge and highway bridge at Chesapeake City,
Md.; reconstruction of highway at Lums Pond, Del.; construction
of mooring dolphins at Reedy Point, Del., and Chesapeake City, Md.,
and dredging preparatory thereto; enlargement of anchorage and
mooring basin in Back Creek at Chesapeake City, Md.; dredging
branch channel at Delaware City, Del.; extension of jetties at Dela-
ware River entrance; and revetment of canal banks. The controlling
depth on June 30. 1937, was 13 4 feet at mean low water (Delaware
River datum). The controlling depth (May 1936) in the Delaware
City branch channel was 2 feet.
    Baltimore, Md., district (section: Courthouse Point to Pooles Is-
land) .- This portion of the existing project is about 62 percent com-
pleted.    The work remaining to be done is completion of the Pooles
Island, Still Pond, Sassafras River, Pond Creek, Reybold Wharf,
and Town Point sections, to full project width and depth by Govern-
ment dredges; completion of land clearing in sections 3 and 4 of the
300             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Pearce Creek disposal area by hired labor; completion and rehan-
dling of dredged material by leased dredge and Government dredge;
completion and construction of culvert and road fill over Pearce
Creek; completion, by contract, of steel bulkhead opposite the re-
handling basin; maintenance by hired labor of dikes and ditches
and maintenance of approximately 70,000 feet of fencing around the
Pearce Creek disposal area. The controlling depth in the approach
channel determined in June 1937 is 18.7 feet at mean low water
 (Delaware River datum).
   The total costs under the existing project to June 30, 1937, were as
follows:

                                                                           New work           Operating
                                                                                              and care              Total


Philadelphia, Pa., district:
    Regular funds---.....-------          -------------------             $3, 111, 921. 24      $225, 547.07     $3,337,468. 31
    Emergency Relief funds------------------------                         4, 555, 274. 82 ------------           4, 555, 274. 82
Baltimore, Md., district: Regular funds-                .----.------------1,215, 656.68       -     .......       1, 215, 656.68
      Total (all funds)---------------.-----------                         8, 882, 852. 74        22, 547. 07     9, 108, 399. 81



  The total expenditures were $3,189,598.73 regular funds and
$4;522,810.39, Emergency Relief funds, a total of $7,712,409.12,
charged to the Philadelphia, Pa., district, and $1,056,715.30, regular
funds, charged to the Baltimore, Md., district, a grand total of
$8,769,124.42.
   In addition the sum of $2,513,270.24 was expended between August
1919, and June 30, 1935, on the operation and care of the works of
improvement under the provision of the permanent indefinite appro-
priation for such purposes.
  Proposed operations.-It is proposed to apply funds unexpended
and accounts receivable on June 30, 1937, in the Philadelphia, Pa.,
and Baltimore, Md., districts from regular appropriation amounting
to $1,314,162.18, together with $2,500,000 allotted from the act of
July 19, 1937, a total of $3,814,162.18, as follows:
Accounts payable June 30, 1937--     --------------------------                                                $529, 461.16
New work:
   Acquisition of land for rights-of-way and dis-
     posal areas -------------------------------- $180, 000.00
   Dredging, by contract in force, from Delaware
     River to a point 180 feet west of St. Georges
     bridge (July-September 1937) ----------------              50, 000.00
   Dredging, by contract in force, from a point 180
     feet west of St. Georges Bridge to a point 325
     feet east of Pennsylvania R. R. bridge (July-
          December           1937)       ----------                                    110, 000.00
      Dredging, by contract in force, from a point 210
        feet east of Summit Bridge to a point 1,500
       feet east of Guthries Run spillway (July 1937-
        January 1938) ------------------------------    500, 000. 00
      Dredging, by contract in force, from a point
        1,500 feet east of Guthries Run spillway to
        Bethel, Md. (July-September 1937)----------      50, 000. 00
      Alteration of Pennsylvania Railroad bridge
       crossing the canal, by contract in force, (July-
        September 1937) ------------------            - 200, 000. 00
      Reconstruction of approximately 1 mile of con-
        crete highway at Lums Pond, Del., by contract
        (November 1937-January 1938) -------------       50, 000. 00
       RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                   1301

   Dredging preparatory to construction of mooring
     dolphins, by U. S. pipe-line dredge Alabama
     at Reedy Point, Del., and Chesapeake City, Md.,
     31/2 months (July-October 1937)- ___          ---  $85, 359. 02
   Construction mooring dolphins at Reedy Point,
     Del., and Chesapeake City, Md., by contract,
      (October 1937-April 1938) ----------------- 155, 000. 00
   Extension of jetties at Delaware River entrance
      (January 1938-June 1939) ----------------         720, 000. 00
   Dredging by Government plant the following
     sections of the approach channel to the
     Chesapeake and Delaware Canal:
        Pooles Island section, Still Pond section,
          Sassafras   River section,         Pond Creek
          section, Reybold Wharf section and Town
          Point section (July-December 1937)------ 535, 600. 00
        Clearing of land in sections 3 and 4, by
          hired labor (July-August 1937)----------12, 325.00
   Hire by contract of pipe-line dredge or use
          of Government dredge for rehandling
          material at Pearce Creek Disposal Basin,
           (July-October 1937) -------------------      300, 000. 00
         Complete construction by contract of culvert
          and road fill over Pearce Creek, under
          existing contract (July-August 1937)_...        10, 355. 00
         Complete construction, by contract, of steel
          sheet pile bulkhead at Pearce Creek re-
          handling basin (July 1937)----_-------           1, 042. 00    iAA   w   A   AA   A




                                                                         $2, 959, 681. 02
Maintenance:
    Operation of derrick boat No. 37, and attendant
      plant (July 1937-J'une 1938)-                        77, 000. 00
    Maintenance of canal banks, boardwalks and
      auxiliary works throughout the year____ __           73, 000.00
    Channel examination and surveys throughout
      the year------------      -- _-_-------              30, 000. 00
    Repairs by hired labor of steel sheet pile bulk-
      head at Pearce Creek rehandling basin (July-
      September 1937)                      ______          18, 000. 00
    Maintenance by hired labor of hydraulic dike
      and dikes and adjacent ditches at Pearce
      Creek disposal area (July-November 1937)--_           6,000.00
    Maintenance by hired labor of 70,000 feet of
      fencing around Pearce Creek disposal area
      (July-November 1937) _        _    _      __         1, 020. 00
                                                                               205, 020. 00
    Maintenance (operating and care):
        General operating expenses-----_-----_-__          45, 000. 00
        Operation of bridges-________--------___           50, 000. 00
        Ordinary maintenance and repair of bridges_        25, 000. 00
                                                                               120, 000. 00
               Total for all work--------_______------------------_       3, 814, 162. 18
  It is proposed to apply the funds unexpended under Emergency)
Relief Appropriation on June 30, 1937, amounting to $406,449.61,
less $180,389 revoked in July 1937, a net amount of $226,060.61 as
follows :
Accounts payable June 30, 1937------------------------                         $38, 480. 32
New work:
    Alteration of existing highway bridges under
      contracts in progress (adjustment of claims for
      additional work) -------------------------      $28, 387. 29
    Payment of awards for land acquired----------159, 193. 00
                                                                         -•187,     580. 29
      Total.   --------------------------------        ------- a-----          226, 060. 61
302          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The sum of $1,335,000 can be profitably expended during the fiscal
year 1939, as follows:
New work:
   Dolphins and fenders at bridges (July-December 1938)_ $100, 000
   Enlargement of anchorage and mooring basin in Back
     Creek, at Chesapeake City, Md. (September-October
      1938) --                     __-----------------------------------     43, 000
   Dredging branch channel at Delaware City, Del., to 6
     feet by contract (May-June 1939) ------------------                     67, 000
   Revetment of canal banks, as required, by hired labor
      (July 1938-June 1939)                                                500, 000
                                                                 __----------------------------

         Total___           --------------------------------------                                        $710, 000
Maintenance:
    Operation of hopper dredge, pipe-line dredge, derrick
       boat No. 37, and attendant plant-_______________     290, 000
    Dredging by Government plant of Chesapeake Bay
       approach (July 1937-June 1938) -------------------   100, 000
    Maintenance of canal banks and auxiliary works------     70, 000
    Removal of miscellaneous obstructions and debris .-...   10, 000
    Channel examinations and surveys _________-____-_        30, 000
                                                                                                            500,000
Maintenance (operating and care) :
   General operating expenses--    ______---_________--50, 000
   Operation of bridges________----_______________-_      50, 000
   Ordinary maintenance and repair of bridges ----------- 25, 000
                                                                                                           125, 000

            Total for all work                                                                           , 335, 000
                                                                                                        1______-------------------------
    The proposed new work will complete the project.
                                     Cost and financial summary
                            MAINTENANCE              AND IMPROVEMENT         FUNDS


Cost of new work to June 30, 1937 _________________________                                       $15, 037, 332. 93
Cost of maintenance to June 30, 1937 _____________                                       ___       17, 111, 984. 43

      Total cost of permanent work to June 30, 1937-----------                                    22, 149, 317.36
Undistributed costs June 30, 1937                                                                     214, 643. 10
      Net total cost to June 30, 1937_-___ _________________22, 363, 960. 46
Plus accounts receivable June 30, 1937______________________      8, 007. 10

      Gross total costs to June 30, 1937_ _____ --   ____________                                 22, 371, 967. 56
Minus accounts payable June 30, 1937-                 --
                                          __--- - _______________                                     529, 461. 16

     Net total expenditures --_--__--1------121,                                                       842, 506. 40
Unexpended balance June 30, 1937----------------------------                                        1, 306, 155. 08

        Total amount appropriated to June 30, 1937--___                                            23, 148, 661. 48


   Fiscal year ending June 30           1933              1934           1935              1936              1937


Cost of new work--- ----------       $166, 781. 10      $76, 817. 79    $5, 050.00      $21, 123. 84    $4, 306, 454. 08
Cost of maintenance------------. .    354, 810. 80      376, 872. 80   500, 474. 29     686, 518. 13        279, 773. 28

      Total cost-----------------     521, 591 90       453, 690. 59   505, 524. 29     707, 641. 97     4, 586, 227. 36

Total expended------------------      531, 202. 31      390, 454. 07   227, 861. 28     738, 725. 04     4, 100, 711. 03

Allotted------------------------      465, 299. 56      557, 095. 20   752, 000.00    4, 294, 538. 97         000.00
                                                                                                         1,090,


1Includes $2,513,270.24 from Permanent Indefinite Appropriation for Operation and
Care.
           RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                     303
Balance unexpended July 1, 1936_______                                                                            $4, 316, 866. 11
Amount allotted from War Department Appro-
priation Act approved April 26, 1934---------- $107, 641. 85
Amount allotted from War Department Appro-
  priation Act approved May 15, 1936 _________   992, 358. 15
                                                                                                                   1, 100, 000. 00

      Amount to be accounted for ___________---
                                        ---                                                                        5, 416, 866. 11
Deductions on account of revocation of allotment                                                                       10, 000. 00
      Net amount to be accounted for_________                                                                      5, 406, 866. 11
Gross amount expended___________---___ $4, 132, 912. 73
Less-
    Reimbursements collected---..   $28, 640. 19
    Receipts from sales -----------
                             __       3, 561. 51
                                                 32, 201. 70
                                                                                                                   4, 100, 711. 03

      Balance unexpended June 30, 1937_______ ___________                                                          1, 306, 155. 08
Outstanding liabilities June 30, 1937----------- $421, 468. 62
Amount covered by uncompleted contracts ___ 1, 193, 327. 47
                                                                                                                   1, 614, 796. 09
     Balance available June 30, 1937________________ __                                                            -308, 641. 01
Accounts receivable June 30, 1937____ _                                                                                 8, 007. 10
     Unobligated balance available June 30, 1937_                                                                  -300, 633. 91
Amount allotted during July 1937___                                                                                2, 500, 000. 00

.Balance   available for fiscal year 1938___________                                                               2, 199, 366. 09
Amount (estimated) required to be appropriated for comple-
tion of existing project 2__________________________________                                                          710, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
     For    new work 2----                                                                                             710, 000. 00
                                2          _
     For maintenance                                                                                                   625. 000. 00
                - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -
        Total                                                                                                      1, 335, 000. 00

  2 Exclusive of available funds.
                                           EMERGENCY             RELIEF       FUNDS


Cost of new work to June 30,. 1937                          ________              _______________                 $4, 555, 274. 82
Cost of maintenance to June 30, 1937______________________-------                                                                  --
      Total cost of permanent work to June 30, 1937
Undistributed costs June 30, 1937
                                                        _...
                                   ______________________
                                                                                               -..                  4, 555, 274. 82
                                                                                                                         6, 015. 89
     Net total cost to June 30, 1937________________________                                                        4, 561, 290. 71
Minus accounts payable June 30, 1937 ___________-__________                                                             38, 480. 32
        Net total        expenditures_________________________                                         _            4, 522, 810. 39
Unexpended       balance June 30, 1937__________________________                                                       406, 449. 61
        Total amount appropriated to June 30, 1937-----------                                                       4, 929, 260. 00

   Fiscal year ending June 30                  1933                  1934              1935                1936             1937

Cost of new work___________---.------$----------------------$2,                                         674, 227. 10    $1, 881.047. 72
Cost of maintenance __ ___ ___          . ..
                                        _.                       . . ..-..                . . .
Total expended.............---                              ------      _     .        .....         2, 997, 354. 91     1, 525, 455. 48
Allotted---------'-------------                                                   $5,107.000.00       --250,000.00          72, 260.00

        20196-37-pt. 1-20
304              REPORT OF                -CHIEF OF          ENGINEERS, U. S. ARMY, 1937

Balance unexlended July 1, 1936___                            $1, 859, 645. 09
Amount allotted from Emergency Relief Appropriation Act of
  Apr. 8, 1935----------------------------------   ----------      80, 000. 00
      Amount to be accounted for ____________--_
                                       --                                                                      1, 939, 645. 09
Deductions on account of revocation of allotment--------------                                                      7, 740. 00
      Net amount to be accounted for       --      --     ----                                                 1, 931, 905. 09
Gross amount expended ------             ______ $1, 529, 045. 75
Less reimbursements collected ----------     -        3, 590. 27
                                                                                                               1, 525, 455. 48

      Balance unexpended June 30, 1937                                                                             406, 449. 61
Outstanding liabilities June 30, 1937_ 1____                                  1     $159,192. 85
Amount covered by uncompleted contracts ------                                        66, 867. 65
                                                                                                                   226, 060. 50

           Balance available June 30, 1937_                                                                        180, 389. 11

    CONSOLIDATED COST AND FINANCIAL SUMMARY FOR DELAWARE AND CHESAPEAKE
                                   WATERWAY

tost of new work to June 30, 1937    --------------
                                               _$19,                                                               592, 607. 75
Cost of maintenance to June 30, 1937__________     ____-_                                                     17, 111, 984. 43

       Total cost of permanent work to June 30, 1937---------                                                 26, 704, 592. 18
TJndistributed costs June 30, 1937__--__-- ______________
                                                        -220,                                                          658. 99

      Net total cost to June 30, 1937----------------------26,                                                     925, 251. 17
Plus accounts receivable June 30, 1937_--------____                                                                  8, 007. 10
       Gross total costs to June 30, 1937------ ___________                                                   26, 933, 258. 27
1Minus accounts payable June 30, 1937 -- ___________________                                                      567, 941. 48
      Net total expenditures---__________-
                                  -     --                                          _________             126, 365, 316. 79
,Unexpended balance June 30, 1937 __---                                      ..- ________-_____             1, 712, 604. 69
           Total amount appropriated to June 30, 1937-----                                   ------       1 28, 077, 921. 48

    Fiscal year ending June 30                  1933            1934                1935               1936             1937


Cost of new work- ---.---------. $166, 781. 10                $76, 817. 79         $5, 050. 00 $2, 695, 350. 94    $6,187, 501.80
Cost of maintenance------------............   354, 810. 80    376, 872. 80        500, 474. 29     686, 518. 13        279, 773. 28
       Total cost-.--------------             521, 591. 90    453, 690. 59        505, 524. 29   3, 381, 869. 07     6, 467, 275.08
Total expended-----------------               531, 202. 31    390, 454.07         227, 861. 28   3, 736,079. 95     5, 626,166. 51
Allotted-..     ---------------------         465, 299. 56    557, 095. 20    5, 859, 000. 00    4, 044, 538. 97     1, 162, 260. 00


Balance unexpended July 1, 1936-_--__-
                                     -- _   -______                                                _          $6, 176, 511. 20
Amount allotted from War Department Appro-
priation Act approved Apr. 26, 1934----------- $107, 641.                                         85
Amount allotted from War Department Appro-
  priation Act approved May 15, 1936              992, 358.  -----------                           15
Amount allotted from Emergency Relief Appro-
priation Act approved Apr. 8, 1935_-__________     80, 000.                                       00
                                                                                                               1, 180, 000. 00
Amount to be accounted for _________ ___     __-   _______- -                                                  7, 356, 511.20
Deductions on account of revocation of allotment-------------                                                      17, 740. 00
      Net amount to be accounted for-..                              ____-__- -        -                       7, 338, 771. 20
Gross amount expended_------------------_                                 $5, 661,958.48
   1 Includes $2,513,270.24 from Permanent Indefinite Appropriation for operating and care.
            RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                      305
Less-
     Reimbursements collected- __    $32, 230. 46
     Receipts from sales------------   3, 561. 51
                                                                                $35, 791. 97
                                                                                                     $5, 626, 166. 51
     Balance unexpended June 30, 1937- -------------------    1, 712, 604. 69
           liabilities June 30, 1937-
,Outstanding                                          661. 47
                                                $-----------580,
Amount covered by uncompleted contracts------ 1, 260, 195. 12
                                                                                                      1, 840, 856. 59

      Balance available June 30, 1937-----------------------                                          -128, 251.90
Accounts receivable June 30, 1937----------------------------_                                            8, 007. 10

     Unobligated balance available June 30, 1937 ------------                                         -120, 244. 80
Amount allotted during July 1937 from War Department Civil
Appropriation Act approved July 19, 1937                                                             2, 500, 000.00
Balance available for fiscal year 1938------------------------                                        2, 379, 755. 20

Amount (estimated) required to be appropriated for comple-
   tion of existing project 2---------------                                                            710, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30,, 1939: 2- - - - - - - - - - - - - - - - - -
                                                        - - - - - - - - - - - -- -- - - - - -
   For new work                                                                              -          710, 000. 00
                        - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -
   For maintenance 2                                                                                    625, 000. 00

          Total   2 ---------------------                                                             1, 335, 000. 00
   2Exclusive     of available funds.

                                            7. SMYRNA RIVER, DEL.

    Location.-This stream, formerly Duck Creek, rises on the Mary-
land-Delaware divide, flows 15 miles along the boundary line between
New Castle and Kent Counties, Del., and empties into the Delaware
Bay, about 57 miles below Philadelphia, Pa. (See U. S. Coast and
Geodetic Survey Chart No. 294.)
    Previous projects.-Adopted by River and Harbor Acts of June 14,
1880, August 11, 1888, June 13, 1902, and March 3, 1905. The cost
and expenditures were $55,084.78 for new work and $22,722.85 for
maintenance, a total of $77,807.63. For further details see page 1786,
Annual Report for 1915.
    Existing project.-This provides for a channel 7 feet deep at mean
low water, 100 feet wide across the bar outside the mouth, and 60
feet thence to Smyrna Landing, a distance of 10 miles, including
three cut-offs which shortened the distance 1.2 miles, and the per-
manent protection of the channel across the bar outside the mouth
by stone-filled, pile, and timber-crib jetties. The north jetty is 803
feet long, and the projected length of the south jetty is 2,700 feet.
The mean range of the tide at the mouth is 5.6 feet, at Flemings Land-
ing, about halfway up the river, 3.7 feet, and at Smyrna Landing,
the head of navigation, 3.4 feet. The extreme range of tide is from
  1 foot below mean low water to 2 feet above mean high water.
    The estimate of cost for new work, revised in 1928, is $150,000,
exclusive of amounts expended on previous projects. The latest
  (1928) approved estimate for annual cost of maintenance is $3,000.
    The existing project was adopted by the River and Harbor Act
  of June 25, 1910 (H. Doc. No. 815, 60th Cong., 1st sess.). The latest
  published map is in that document.
306              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-Fully complied with.
   Terminal facilities.-There are nine wharves and landings of pile
and timber construction. The terminals are considered adequate for
existing commerce.
   Operations and results during fiscal year.-Maintenance dredging,
under contract, at the entrance channel and from Cave Landing to
Prices Landing, in progress at the close of the last fiscal year, was
completed October 20, 1936. There were removed during the year
26,814 cubic yards, place measurement, of mud, sand and clay at a
cost of $6,440.03 for maintenance. The expenditures were $8,376.66.
   Condition at end of fiscal year.-About 53 percent of the existing
project has been completed. The uncompleted portion of the project
includes the construction of the south jetty extending its length from
1,204 to 2,700 feet and the improvement of the channel to project
dimensions for a short distance in the upper section of the river
near Smyrna Landing. The controlling depths at mean low water
on June 30, 1937, were as follows: From Delaware Bay to the mouth,
5.7 feet; thence to Prices Landing, 6.9 feet; and thence to Smyrna
Landing, 5.2 feet. The costs and expenditures under the existing
project were $80,302.05 for new work and $78,745.03 for mainte-
nance, a total of $159,047.08.
  Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1937, amounting to $5,792.15, to repairs to jetties,
by contract (September to November, 1937).
  The sum of $40,000 can be profitably expended during the fiscal
year 1939, to be applied to completion of new work extension to
south jetty, by contract (July to November, 1938).
                                              Cost and financial summary

Cost of new work to June 30, 1937-------------------------- $135, 386. 83
Cost of maintenance to June 30, 1937 ------------------------- 101, 467. 88

           Total cost of permanent work to June 30, 1937------------236, 854. 71

Net total expenditures----------------------------        -------- 236, 854. 71
Unexpended balance June 30, 1937------------------------------       5, 792. 15

           Total amount appropriated to June 30, 1937---------------                                              242, 646. 8E

          Fiscal year ending June 30                        1933          1934            1935           1936                  1937

Cost of new work...------------------------------                                                 -------------------
Cost of maintenance__----------------                    $13, 163. 96   $9, 460. 83   _________        $8, 982. 26            $6, 440. 03

Total expended.....            ...--------------------    13, 163. 96    9, 455. 19        $5. 64        7, 045. 63            8, 376. 66
Allotted ..............-----                              13. 163. 96   10 000. 00     20 675. 27...        ...............

Balance unexpended July 1, 1936                                 --------------------------                        $14, 168. 81
Gross amount expended--------                            --------------------------------                           8, 376. 66

           Balance unexpended June 30, 1937_------------------------                                                   5, 792. 15

Amount (estimated) required to be appropriated for completion of
existing project '---------------------------------------------                                                      50, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work 1                _--------------                                                             40, 000. 00
SExclusive of available funds.
              IlVERS AND HARBORS-PHILADELPHIA,                                        PA., DISTRICT       307
                                          8. LITTLE RIVER, DEL.

   Zocation.-Rises in Kent County, Del., flows easterly 7 miles, and
empties into Delaware Bay about 32 miles above Cape Henlopen.
 (See U. S. Coast and Geodetic Survey Chart No. 1218.)
   Exiti7tg project.-This provides for a channel 5 feet deep at mean
low water from the 5-foot contour in Delaware Bay to the bridge at
Little Creek Landing, 3 miles above the mouth, 60 feet wide across
the bar outside the mouth, and 40 feet wide in the river, including
several cut-offs to eliminate sharp bends, and which shortened the
distance about half a mile. The mean range of tide at the mouth
is 5.1 feet and at Little Creek Landing 5.2 feet. The extreme range
of tide is from 2 feet below mean low water to 1 foot above mean
high water.
   The estimate of cost for new work, made in 1912, was $14,000.
The latest (1928) approved estimate for annual cost of maintenance
is $3,000.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 626, 62d Cong., 2d sess.). There is no
published map of the river.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three pile-and-timber wharves or
landings on this stream. The terminal facilities are considered ade-
quate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1914 at a saving of $1,984 under the estimated cost. The controlling
depths at mean low water on June 30, 1937, were as follows: From
Delaware Bay to the mouth, 3.3 feet; and thence to the highway
bridge at Little Creek Landing, 2.8 feet.
   The cost and expenditures were $58,036.45, of which $12,015.86
was for new work and $46,020.59 for maintenance.
   Proposed operations.-No funds are available, and no work is
contemplated during the fiscal year 1938.
   The sum of $15,000 can be profitably expended during the fiscal
year 1939 to be applied to maintenance dredging in the entrance
channel and shoals within the river, by contract, about 50,000 cubic
yards (July to November 1938).
                                         Cost and financial summary
Cost of new work to June 30, 1937 _____________________________ $12, 015.86
Cost of maintenance to June 30, 1937---------------------------- 46, 020. 59

      Total cost of permanent work to June 30, 1937----------_                                      58, 036. 45
Net total expenditures ------------                                                                 58, 036. 45
Total amount appropriated to June 30, 1937---------------------                                     58, 036. 45

          Fiscal year ending June 30                    1933        1934            1935     1936       1937


Cost of new work .-----------------------------------
Cost of maintenance...  .......--------------------
                                                ------------ $15, 000.00
Total expended._ ..-------------------------------                15, 000. 00
Allotted-                     -                -     ....... --   15, 000. 00   ..--------          I

Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance .. __________-___-___-____   $15, 000. 00
308     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                     9. ST. JONES RIVER, DEL.*

   Location.-Rises in the western part of Kent County, Del., flows
southeasterly 22 miles, and empties into Delaware Bay about 26
miles above Cape Henlopen. (See U. S. Coast and Geodetic Survey
Chart No. 1218.)
   Previous projects.-Adopted by River and Harbor Act of March
3, 1881; modified in 1884 and again in 1889. The cost and expendi-
tures were $54,590.20 for new work and $28,866.30 for maintenance,
a total of $83,456.50. For further details see page 1787, Annual
Report for 1915.
   Existing project.-This provides for an entrance channel 7 feet
deep and 60 feet wide extending from the mouth of the river to a
junction with Murderkill River entrance channel 2,700 feet offshore,
thence following the latter to deep water, protected on the north by
a jetty 5,700 feet long, and on the south by a second jetty 4,100 feet
long extending from the south bank of the Murderkill River to a
point abreast the outer end of the proposed north jetty, a channel
within the river 7 feet deep at mean low water from the mouth to
Dover, 50 feet wide from the mouth to Lebanon, a distance of 7
miles, and 40 feet wide thence to Dover, a further distance of 4 miles,
and the dredging of 16 cut-offs to shorten the distance and eliminate
sharp turns and bad shoals.
   The mean range of tide at the mouth is 4.5 feet, at Lebanon 2.0
feet, and at Dover 1.5 feet. The extreme range of tide is from I foot
below mean low water to 2 feet above mean high water.
   The estimate of cost for new work, revised in 1937, is $420,000,
exclusive of amounts expended on previous projects, with mainte-
nance estimated at $9,000 annually for the entire project.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1116, 60th Cong., 2d sess.). It was
modified by the River and Harbor Act of June 5, 1920, so as to
provide that no part of the appropriation shall be expended for
the excavation of any cut-off until satisfactory title to the land re-
quired for the cut-off shall have been transferred to the United
States free of cost. It was also modified by the River and Harbor
Act approved August 26, 1937 (Rivers and Harbors Committee Doc.
No. 18, 75th Cong., 1st sess.), to provide for a realined entrance
channel and jetties at the month. The latest published maps are in
the project documents.
   Local cooperation.-The project is subject to the conditions that
local interests furnish, free of cost to the United States, necessary
rights of way and suitable spoil-disposal areas for new work and for
subsequent hiaintenance as required. All prior requirements have
been fully complied with.
   Terminal facilities.-There are three wharves and several landings
along the river, all of which are privately owned but are open to use
by the general public. None of the wharves have railroad connections.
   Operations and results during fiscal year.-Maintenance dredging
under contract, of the entrance channel was commenced October 24,
1936, and was completed May 11, 1937. There were removed 63,076
cubic yards, place measurement, of mud, sand and clay at a cost of
$19,323.32, for maintenance. The expenditures were $19,409.99.
          RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                    309,
   Condition at end of fiscal year.--About 40 percent of the existing
project has been completed. To complete the project requires the
dredging of the realined entrance channel, the construction of the
jetties at the entrance, and the dredging in the upper end of the im-
provement. The controlling depths at mean low water on June 30,
1937, were as follows: From Delaware Bay to the mouth, 4.7 feet;:
thence to Barkers Landing, 6.5 feet; thence to Lebanon, 5.7 feet; and
thence to Dover, 5.0 feet. The costs were $152,512.17 for new work
and $35,670.92 for maintenance, a total of $188,183.09. The total ex-
penditures were $188,170.20.
   Proposed operations.-Itis proposed to apply the funds unexpended
June 30, 1937, amounting to $1,129.80, as follows:
Accounts payable June 30, 1937------------------------------------
Maintenance : Surveys and channel examinations throughout the year_                                    1, $12. 89
                                                                                                          116.91

        Total ---------------------------------------------------                                       , 129. 80
  The sum of $262,700 can be profitably expended during the fiscal
year 1939, to be applied to new work dredging and jetty construction
at the mouth, by contract (July 1938 to April 1939).
                                  Cost and financial summary
Cost of new work to June 30, 1937 -----------------------------                                  $207, 102. 37
Cost of maintenance to June 30, 19376---------------------------                                   64, 537. 22'

      Total cost of permanent work to June 30, 193.7--------------                                271, 639. 59
Minus accounts payable June 30, 1937----------------------------                                        12. 89
     Net total expenditures-----------------------------------                                    271, 626. 70
Unexpended balance June 30, 1937-------------------------------                                     1, 129. 80
        Total amount appropriated to June 30, 1937-------------                             _     272, 756. 50

        Fiscal year ending June 30              1933         1934         1935            1936            1937


Cost of new work..-----------------------      $25, 200
Cost of maintenance ______  _             ____                                        $1, 559. 77       $19, 323. 32
Total expended...--.-----------------------25, 200                          -_            1,460. 21      19, 409. 99
Allotted-------------------------------          25, 200 ------------     $18, 000   ------------         4, 000. 00


Balance unexpended July 1, 1936------------------------------                                     $16, 539. 79
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------                                                      4, 000. 00

      Amount to be accounted for-----------------------------                                         20, 539. 79
Gross amount expended-------------------------                                                        19, 409. 99
     Balance unexpended June 30, 1937-- ---------------                               _                1, 129. 80
Amount covered by uncompleted contracts ----------------------                                             12. 89

        Balance available June 30, 1937------------------1,                                              116.91

Amount (estimated) required to be appropriated                         for completion
                              ---- -- -- - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project 1______                                _                                     267, 500. 00,
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work 1------------------------------------                                    262, 700. 00
  1Exclusive of available funds.
310      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                      10. MURDERKILL RIVER, DEL.

   Location.-Rises in Kent County, Del., flows northeasterly 19 miles,
and empties into Delaware Bay about 25 miles above Cape Henlopen.
 (See U. S. Coast and Geodetic Survey Chart No. 1218.)
   Exiti'ng project.-This provides for a channel 7 fe6t deep at mean
low water from Delaware Bay to Frederica, 150 feet wide across the
flats outside the mouth, a distance of about 1 mile, and 80 feet wide
inside the river to Frederica, a distance of about 71/2 miles. The
mean range of tide is 4.6 feet at the mouth and 2.4 feet at Frederica.
The extreme range of tide is from 1 foot below mean low water to 2
feet above mean high water.
   The estimate of cost for new work, revised in 1928, is $60,000.
The latest (1928) approved estimate for annual cost of maintenance
is $5,000.
   This project was adopted by the River and Harbor Act of July 13,
1892 (H. Ex. Doc. No. 21, 52d Cong., 1st sess., and Annual Report
for 1892, p. 981). The latest published map is in House Document
No. 1058, Sixty-second Congress, third session.
   Terminal facilities.-There are six wharves or landings of pile and
timber construction, all of which are privately owned. The facilities
are considered adequate for existing commerce.
   Operations and results-during fiscal year.-Maintenance dredging,
under contract, of the entrance channel was commenced May 11, 1937,
and was completed May 29, 1937. There were removed 33,332 cubic
yards, place measurement, of mud, sand, and clay at a cost of
$9,436.44. A survey from the mouth to Frederica, Del., was made
in February 1937 at a cost of $2,430.10. The total costs were
$11,866.54, for maintenance. The expenditures were $11,481.23.
   Condition at end of fiscal year.-About 63 percent of the existing
project has been completed. The remaining portion is the widening
of the channel across the flats and in the river, which at the present
time is not considered important. The controlling depths at mean
low water on June 30, 1937,'were as follows: From Delaware Bay
to the mouth, 7.0 feet; and thence to Frederica, 6.2 feet.
   The costs were $192,434.76, of which $37,630.07 was for new work
and $154,804.69 for maintenance.       The total expenditures were
 $192,049.45.
   Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1937, amounting to $13,901.54, as follows:
Accounts payable June 30, 1937 _____                           -_      $385. 31
Maintenance: Dredging the shoals in the channel between Bowers
and Frederica, under contract (September-November 1937)----         13, 516. 23
      Total----------------------------------------------            13, 901.54
  No funds can be profitably expended during the fiscal year 1939,
as it is believed that no maintenance will be necessary.
                         Cost and financial summary
Cost of new work to June 30, 1937                                    37, 630. 07
                                                                    $_____________----
Cost of maintenance to June 30, 1937___________---                  154, 804. 69
       Total cost of permanent work to June 30, 1937-------------   192, 434. 76
Minus accounts payable June 30, 1937 _____________----------             385. 31
      Net total expenditures_ __________-___________         -      192, 049. 45
Unexpended balance June 30, 1937_ _____ ________----------           13, 901.54
      Total amount appropriated to June 30, 1937 ___-----------     205, 950. 99
             RIVERS AND HARBORS-PHILADELPHIA,                                            PA., DISTRICT                    311

        Fiscal year ending June 30                        1933             1934         1935               1936         1937


Cost ofnew work__------------------------------------------------------------------ -
Cost of maintenance___---------------------- $7. 64 $11, 217. 76 - $32. 00         li 866-54
                                                                              -- $1--
Total expended..---------------------------                  7. 64       11, 215. 26    -29.50      ----               11, 481.23

Allotted-    ___-------- _--------------__     --------------- 13, 000. 00             6, 000. 00    15, 000. 00.


Balance unexpended July 1, 1936__---------------------.---------                                                  $25,382.77
Gross amount expended-------------- ---------------------                                                          11, 481.23

      Balance unexpended June 30, 1937-------------------------13,                                                     901. 54
Outstanding liabilities June 30, 1937---------------------$109. 92
Amount covered by uncompleted contracts-----------          275.39
                                                                                                                        385.31

            Balance available June 30, 1937--------------------------                                               13, 516. 23
Amount (estimated)               required to be appropriated for completion of
   existing       project 1                  ___________--------------                                              22, 400. 00
  1Exclusive of available funds.

                                    11. MISPILLION                   RIVER, DEL.

   Location.-Rises on the boundary line between Maryland and Dela-
ware, flows 15 miles in a general northeasterly direction between
Kent and Sussex Counties and empties into Delaware Bay about 16
miles above Cape Henlopen. (See U. S. Coast and Geodetic Survey
Chart No. 1218.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1879, July 13, 1892, modified July 3, 1893, and by River and Har-
bor Act of March 2, 1907. The cost and expenditures were $148,-
798.41 for new work and $61,172.42 for maintenance, a total of
$20,;970.83. For further details:see page 1786, Annual Report for
1915, and page 448 of Annual Report for 1918.
   Existing project.-This provides for a channel 6 feet deep at
mean low water from Delaware Bay to Milford, a distance of 12
miles, 80 feet wide from the 6-foot curve in Delaware Bay across
the flats to the mouth; thence 60 feet wide in the river, with addi-
tional width at sharp bends; 4 cut-offs, 50 feet wide; and for pro-
tection of the entrance channel by a stone-filled pile and timber-crib
jetty along the south side 5,850 feet long and for a similar jetty along
the north side approximately 6,496 feet long, extending to a point
opposite the end of the south jetty. The mean range of tide is 4.5
feet at the mouth and 3.4 feet at Milford. The extreme range of tide
is from 1 foot below mean low water to 2 feet above mean high
water.
   The estimate of cost for new work revised in 1937 is $177,350,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $7,400.
   The existing project was adopted by the River and Harbor Act of'
March 2.1919 (H. Doc. No. 678, 62d Cong., 2d sess.), and modified
by the River and Harbor Act approved August 26, 1937 (Rivers
and Harbors Committee Doc. No. 83, 74th Cong., 2d Sess.), to pro-
vide for extending the north jetty approximately 3,500 feet to a
point opposite the end of the south jetty. The latest published maps
are in the above documents.
312                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Local cooperation.--Fully complied with.
    Terminal facilities.-There are 12 privately owned bulkhead
wharves at Milford, three of which may be used by the public.
None of the wharves have railroad sidings or connections.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project is about
50 percent completed. The remaining portion is the extension of
3,500 feet to the existing north jetty. The controlling depths at
mean low water were as follows: From Delaware Bay to the mouth,
5.0 feet (March 1937); thence (June 1937) to the highway draw-
bridge, 5.4 feet; and thence to the fixed highway bridge at Milford,
3.5 feet. The cost and expenditures were $87,249.89 for new work
.and $104,694.24 for maintenance, a total of $191,944.13.
    Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1937, amounting to $25,678.39, together with $18,000
allotted from the act of July 19, 1937, as follows:
_Maintenance:
    Dredging of channel outside the mouth, under contract (August-
       September 1937) _____________________-------____            $7, 678. 39
    Repairing jetty, by contract (September 1937 to January 1938)_ 18, 000. 00
    Dredging in entrance channel and removing shoals within the
       river by contract (March-June 1938) -------------------     18,000. 00

                   Total------------                              -------------------------------                          43, 678. 39
   The sum of $90,300 can be profitably expended during the fiscal
year 1939, to be applied to new work jetty construction by contract
 (July to December 1938). The proposed work will complete the
Iproject.
                                                         Cost and financial summary
Cost of inew work to June 30, 1937-----------------------------$236, 048. 30
ACost of maintenance to June 30, 1937                              165, 866. 66

              Total cost of permanent work to June 30, 1937.---------.                                                 401, 914. 96

Net total expenditures _------------       -      -       -                                                            401, 914. 96
Unexpended balance June 30, 1937----__------------------------                                                          25, 678. 39

              Total amount appropriated to June 30, 1937---------------                                                427, 593. 35

              Fiscal year ending June 30                            1933          1934           1935           1936           1937


Cost of new work ....................................
Cost of maintenance.......   ---------------                      $3, 485. 80   $5, 107. 80   $24, 685. 62
Total expended-......-.-.----.-------                                846. 81     7, 746. 79    20, 790. 65    3, 894. 97
Allotted.............................-----------------------...   10, 000. 00    9, 957. 61    29, 000. 00   -5, 000. 00      15, 000. 00


:Balance unexpended July 1, 1936 ------------------------------- $10, 678. 39
Amount allotted from War Department Appropriation Act approved
   May 15, 1936 ___________________________                       15,000. 00

                          ------------------------------------
Amount to be accounted for_                                                                                                25, 678. 39

Balance unexpended June 30, 1937 ________--------                                                                          25, 678. 39
Amount covered by uncompleted contracts----       -----------                                                               7, 575. 36

              Balance available June 30, 1937-- ---------                                            --------              18, 103.03
            RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                       313
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-----------------------------------------                                            $18, 000. 00

         Balance available for fiscal year 1938__----_---------                                            36, 103. 03

Amount (estimated) required           to be appropriated for completion
                                                 -- -- --- -- -- --- --- --- --- --- --
                      - - -- - - - - - - - - - -_________
of existing project 1____                                                                                 90, 300. 00
Amount that can be profitably expended in fiscal year ending June
                           - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1939, for new work 1__                                                                                90, 300. 00
  1 Exclusive of available funds.

                                    12. BROADKILL RIVER, DEL.

    Location.-This river rises in Sussex County, Del., flows north-
easterly 13 miles and empties into Delaware Bay about 5 miles above
Cape Henlopen. (See Coast and Geodetic Survey Chart No. 1218.)
   Existing project.--This provides for the establishment of a perma-
nent entrance by dredging a channel across Lewes Cape 150 feet
wide and 6 feet deep at mean low water from that depth in Dela-
ware Bay to the same depth in Broadkill River, a distance of about
one-half mile, and constructing a stone-filled pile and timber-crib
jetty, 1,275 feet long, on the north side of the entrance; and thence a
channel 6 feet deep at mean low water with a least width of 40 feet,
upstream to Milton, 103/ miles above the new mouth.
    Closure of the present outlet of Broadkill River may be desirable
to insure an adequate tidal flow through the new inlet channel and
reduce maintenance costs in the section of the canal connecting the
proposed harbor with Broadkill River as provided in Rivers and
Harbors Committee Document No. 56, Seventy-fourth Congress, first
session.
   The mean range of tide is 41/2 feet at the mouth and 31/2 feet at
Milton. The extreme range of tide is from 1 foot below mean low
water to 2 feet above mean high water, except in very severe storms.
    The estimate of cost for new work, made in 1905, was $68,330. No
estimate for annual maintenance has been made.
    This project was adopted by the River and Harbor Act of March 3,
1873 (Annual Report for 1872, p. 792 et seq.), and modified by the
River and Harbor Act of March 2, 1907, which provided for the
new mouth in accordance with report published in House Document
No. 214, Fifty-ninth Congress, second session. The latest published
map of the whole river is in the above document, and of the mouth
in House Document No. 128, Sixty-seventh Congress, second session.
    Terminal facilities.-There are four wharves of pile and timber
,construction; the terminals are adequate for existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1913. The controlling depths at mean low water on June
30, 1937, were as follows: From Delaware Bay to the mouth through
the new entrance to Lewes and Rehoboth Canal, 6.0 feet; thence to
the Bascule Highway Bridge, 4.5 feet; and thence to Milton, 2.6 feet.
    The costs and expenditures were $68,227.97 for new work and
$101,723.67 for maintenance, a total of $169,951.64.
   Proposed operations.-No funds are available, and no work is
contemplated during the fiscal year 1938.
    The sum of $15,000 can be profitably expended during the fiscal
year 1939, to be applied to maintenance dredging throughout the
314        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

project, by contract, about 40,000 cubic yards (August-November
1938).
                                 Cost and financial summary
Cost of new work to June 30, 1937---------------------___ ___                                  $68, 227. 97
Cost of maintenance to June 30, 1937-------------------------                                  101, 723. 67
      Total cost of permanent work to June 30, 1937_--------_     _ 169, 031. 64
Net total expenditures --------- --------------------------------   169, 951. 64
Total amount appropriated to June 30, 1937---------------------169, 951.64

        Fiscal year ending June 30               1933         1934         1935         1936           1937


Cost of new work .......................                                   $7 9-
Cost of maintenance .........---------------------------- ------------     $713.97        -        -
Total expended ..........-------------------------------------              713.97
Allotted------------      -------------   --.....---------   $7,500.00 ------------   $6,786. 03


Amount that can be profitably expended in fiscal year ending June 30,
1939 for maintenance        ________                    _$15,                                           ,(00

                13. HARBOR OF REFUGE, DELAWARE BAY, DEL.

   Location.-This harbor is at the lower end of Delaware Bay, a few
miles from the Atlantic Ocean on the Delaware side of the bay. It
is about 120 miles from New York Harbor, about 114 miles from
the entrance to Chesapeake Bay, and about 101 miles from Phila-
delphia, Pa. (See U. S. Coast and Geodetic Survey Chart No. 1218.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of May 7, 1822, and modified by the River and
Harbor Acts of July 4, 1836, January 23, 1880, and August 2, 1882.
   The total cost and expenditures of all projects, prior to the adop-
tion of the existing project which was begun in 1897, were $2,749,-
451.79, all for new work. For further details see annual reports for
1874, part II, page 146, and 1932, page 330.
   Existing project.-This provides for the construction of a break-
water about 8,000 feet long, beginning at a' point about 6,000 feet
from Cape Henlopen and extending in a northerly direction for a
distance of 2,695 feet; thence in a northwesterly direction for 5,330
feet; for the construction of 5 ice piers located in prolongation of this
line and 10 more in a line perpendicular thereto extending toward
the Delaware shore, and for a channel 15 feet deep and 300 feet
wide from deep water in Delaware Bay to the pier of the Atlantic
Fisheries Co. at Lewes, Del., with a turning basin 600 feet square
at the inner end. The mean tidal range at this locality is about 4.3
feet. The extreme tidal range due to wind and equinoctial tides is
about 1 foot greater.
   The estimate of cost for new work revised in 1935 is $2,590,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $28,000.
   The existing project was adopted by the River and Harbor Act of
June 3, 1896 (H. Doc. No. 112, 52d Cong., 1st sess.). A subproject
for the construction of 10 ice piers was approved by the Secreta ry
of War April 23, 1900, and a subproject for 5 additional ice piers
was approved June 30, 1902. The project was modified by the River
and Harbor Act of July 3, 1930 (Rivers and Harbors Committee
        RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                     315
Doc. No. 15, 70th Cong., 1st sess.) to provide for a channel 18
feet deep to the Queen Anne Pier at Lewes, Del. No work has been
done on this channel. The project was further modified by the
River and Harbor Act of August 30, 1935 (Rivers and Harbors
Committee Doc. No. 56, 74th Cong., 1st sess.), to provide for a
channel 15 feet deep to the pier of the Atlantic Fisheries Co., about
0.7 mile east of the Queen Anne pier. The latest published maps
of this locality are printed in the two last-named documents.
    Local cooperation.-The River and Harbor Act of August 30,
1935, provides that local interests shall give assurances satisfactorily
to the Secretary of War that they will dredge their berthing facilities
to a depth of 15 feet and that at least one pier will be made avail-
able for the use of visiting craft, subject to general dockage rates.
None of these conditions has been complied with.
    Terminal facilities.-The only terminal facilities are the wharves
on the Delaware Bay shore about a mile east of the town of Lewes,
Del. These consist of four private piers, with rail connection owned
by fertilizer companies, and the Government iron pier, which is not
in usable condition. The Queen Anne (or Collins) pier, formerly
existing at the western end of the proposed 18-foot channel, was
demolished by ice in the spring of 1936.
    Operations and results during fiscal year.--No operations were
in progress, and no expenditures were made.
     Condition at end of fiscal year.-Based on a comparison of the
cost of new work done under existing project with its total estimated
cost, the project is about 87 percent completed. According to the
latest (1926) survey, the limiting depth for vessels in the protected
  area west of the outer breakwater ranges from 20 to 40 feet at
mean low water. The work remaining to be done to complete the
  project is the provision of a 15-foot channel to the Atlantic Fish-
  eries pier near Lewes, Del., and a turning basin 600 feet wide at
  the inner end, as authorized by the River and Harbor Act of August
  30, 1935. The controlling depth in the proposed channel to the
  Atlantic Fisheries pier is about 12 feet at mean low water. The
  breakwater is in good condition, except for some settlement at the
'lower end. Renairs to the ice piers were completed in 1927. The
  cost and expenditures under the existing project have been $2,238,-
  205.34 for new work and $120,455.55 for maintenance, a total of
  $2,358,660.89.
     Proposed operation..-The sum of $65,000 allotted during July
  1937 will be applied to dredging a 15-foot channel, 300 feet wide,
  from deep water to the Atlantic Fisheries Co. pier, with a turning
  basin 600 feet wide at inner end, by contract. This work will com-
  plete the project.
     No additional funds can be profitably expended during the fiscal
  year 1939.
                           Cost and financial summary

Cost of new work to June 30. 1937------------------             $4, 987, 657.13
Cost of maintenance to June 30, 1937__---   _____-__---------       120, 455.55
       Total cost of permanent work to June 30, 1937---------    5,   108, 112. 68
Net total expenditures--------------------------          ---   5,   108,112. 68
Total amount appropriated to June 30, 1937-_     ___-------     5,   108, 112. 68
Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937_                             -------         65, 000. 00
Balance available for fiscal year 1938--......     -----      -       65, 000.00
316     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

14. INLAND WATERWAY BETWEEN REHOBOTH BAY AND DELAWARE
                        BAY, DEL.

   Location.-This waterway, a tidal canal, situated in the south-
earterly part of Sussex County, extends 12 miles from Rehoboth
Bay northward through the highland west of the town of Rheoboth
to Gordon Lake; thence through the marshes back of Cape Henlopen
to Lewes River. It then follows the latter a distance of about 11/4
miles west of the town of Lewes, Del., and empties into Delaware
Bay through a new inlet to be dredged 21/3 miles southeast of the
present mouth of Broadkill River. Beyond the proposed new inlet,
the inland waterway extends westward a distance of about 2 miles
to its junction with the Broadkill River. (See U. S. Coast and
Geodetic Survey Charts Nos. 379, 1218, and 1219.)
   Previous projects.-A canal along a slightly different route formed
a part of the projected waterway from Chincoteague Bay, Va., to
Delaware Bay, begun in 1886 and abandoned in 1905.
   Existing project.-This provides for an entrance channel near
Lewes, Del., 6 feet deep and 200 feet wide, protected by jetties 500
feet apart and 1,700 feet long; for widening the existing canal to
100 feet from the Broadkill River to the South Street Bridge at
Lewes, with a basin of the same depth 1,200 feet long and up to
375 feet in width at the latter point; for a channel 6 feet deep and
50 feet wide (40 feet wide through deep cutting) extending about
71/2 miles from Lewes to Rehoboth Bay; and for two parallel rubble
mound jetties 725 feet long at the entrance from Rehoboth Bay.
The project also includes the construction of one railroad and one
highway bridge at Rehoboth. The mean range of tide at the Dela-
ware Bay end is 41/ feet and at the highway bridge near Rehoboth
about 0.6 foot. The extreme during storm tides is from 1 foot below
mean low water to 3 feet above mean high water.
   The estimate of cost for new work made in 1935 is $526,000, exclu-
sive of amount expended on previous projects, and exclusive of
$60,000 contributed funds, but including $14,275 for the purchase of
land since obtained free of cost to the United States, making the
actual estimated cost for the construction of the canal $571,725,
which includes $60,000 contributed funds and $37,343.58 awarded
the railroad company in full for all damages to that company for
the erection and maintenance of a railroad bridge across the canal
at Rehoboth. The latest (1935) approved estimate for annual cost
of maintenance is $19,500.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 823, 60th Cong., 1st sess. and Rivers and
Harbors Committee Doc. No. 51, 61st Cong., 3d sess.) and modified by
the River and Harbor Act approved August 30, 1935 (Rivers and
Harbors Committee Doc. No. 56, 74th Cong., 1st sess.), to provide an
entrance channel near Lewes, protected by jetties, and widen the
canal from the Broadkill River to the South Street Bridge at Lewes,
with a basin at the latter point. The latest published maps are found
in the last-named document.
   Local cooperation.-Fully complied with.
       RIVERS AND HARBORS-PHILADELPHIA,                           PA., DISTRICT      317

   Terminal facilities.-There are two wharves at Lewes, Del., one
owned by the town and one Government-owned, both open to public
use, and two private wharves at Rehoboth, one of which has direct
railroad connection. These wharves are considered adequate for the
existing commerce.
   Operations and results during fiscal year.-Dredging of new en-
trance channel, widening the canal from Broadkill River to South
Street Bridge, Lewes, Del., and dredging turning basin at the latter
point was commenced December 30, 1936, and was completed May 17,
1937. There were removed 521,828 cubic yards, place measurement,
of mud and clay, at a cost of $68,382.89 for new work.
   Construction of sheet pile jetties at new entrance was commenced
February 1, 1937, and was 74 percent completed at the end of the
fiscal year. The cost was $124,253.82, for new work.
   The total costs for the year were $132,636.71, for new work. The
expenditures were $111,061.74. In addition $60,000 contributed funds:
was expended for new work.
   Condition at end of fiscal year.-About 80 percent of the existing
project has been completed. The remaining portion is reinforcing
the jetties in Rehoboth Bay, built in 1903 under a previous project,.
and completing the construction of steel sheet pile jetties, which is
approximately 74 percent completed. The controlling depths at mean
low water on June 30, 1937, were as follows: From Delaware Bay to,
the mouth through the new entrance, 6.0 feet; thence to the highway
bridge at Lewes, 5.8 feet; and thence to Rehoboth Bay, 4.2 feet.
The costs under the existing project, exclusive of $60,000 contributed
funds, expended for new work, were $397,136.44 for new work and
 $21,603.53 for maintenance, a total of $418,739.97. The total expendi-
tures, excluding $60,000 contributed funds, were $397,165. Of this
cost and expenditure, $69,710.25 was in payment September 15, 1915,
to the railroad company of award in condemnation proceedings under
the River and Harbor Act of March 4, 1915.
   Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1937, amounting to $58,938.26, as follows:
Accounts payable June 30, 1937--------------------------------- $21, 574. 97
New work: Construction of jetties under contract in force to be
  completed July 31, 1937 __________________________      ____-  37, 363. 29
      Total ----------------------                                              58, 938. 26
   No funds can be profitably expended during the fiscal year 1939,
as it is believed that no maintenance will be required.
                                     Cost and financial summary

Cost of new work to June 30, 1937---------------------------$397,136. 44
Cost of maintenance to June 30, 1937______--  ___------__     - 21, 603. 53'
     Total cost of permanent work to June 30, 1937-                ___-----    418, 739. 97
Minus accounts payable June 30, 1937 .-    ____, _                  ____--      21, 574. 97
     Net total expenditures------------------------------                     1397, 165. 0
Unexpended balance June 30, 1937____________---------------                     58, 938. 26
      Total amount appropriated to June 30, 1937--- ---                   -   1456, 103. 2i
  1In addition, $60,000 contributed funds was expended on new work.
318             REPORT ,OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


        Fiscal year ending June 30                         1933                1934            1935        1936          1937


Cost of new work---------- ------------ ------------ --------------------
                                                                  _                                                  1$132, 636. 71
Cost of maintenance-_----------------------__
Total expended            .------------------------------------------------------------                                111, 061.74
Allotted ----        ---------                ------------          ------------          -----------------------      170, 000. 00


Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936----------------------------------------                                                     $170, 000. 00
Gross amount expended ---------------------                                                                        111, 061. 74

    Balance unexpended June 30, 1937------------------------                                                        58, 938. 26
Amount covered by uncompleted contracts-----------------------                                                      58, 550. 27

        Balance available June 30, 1937--------------------------                                                       387.99
  1 In addition, $60,000 contributed funds was expended on new work.

                     15. INDIAN RIVER INLET AND BAY, DEL.

   Location.-This bay is a shallow lagoon 6 miles long and 2 miles
wide on the Delaware coast about midway between Cape Henlopen
and the Maryland State line. The inlet is a narrow and unstable
opening through the barrier beach separating Indian River Bay
and the Atlantic Ocean. (See U. S. Coast and Geodetic Survey
Chart No. 1219.)
   Existing project.-This provides for the fixation of the inlet by
the construction of parallel jetties 500 feet apart, with cores of suit-
ably graded rock, extending approximately to the 14-foot depth
curve in the ocean; and the dredging of a channel generally 200 feet
wide and 15 feet deep from the inner ends of the jetties to a point
in the bay substantially 7,000 feet from the ocean shore line, thence
progressively decreasing depth, and width decreasing from 200 feet
to 100 feet, to the 6-foot depth curve in the bay, and provides further
that the interior channel dimensions may, in the discretion of the
Chief of Engineers, be modified as may be found desirable to increase
the hydraulic efficiency of the channel, without increasing the cost.
The mean range of ocean tide is 4.0 feet in the bay.
   The estimate of cost for new work made in 1937 is $443,000, of
which $160,000 is to be contributed by local interests. The latest
 (1937) approved estimate for annual cost of maintenance is $10,000.
   The existing project was adopted by the River and Harbor Act
approved August 26, 1937 (Rivers and Harbors Committee Doc. No.
41, 75th Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-The project is subject to the conditions that
local interests contribute $160,000, toward the initial cost of the
improvement, furnish, free of cost to the United States, a right-of-
way not less than 700 feet wide and suitable spoil-disposal areas for
new work and for subsequent maintenance as required, release the
United States from all claims for damages incidental to the work of
improvement, and agree to provide and maintain an adequate mov-
able-span highway bridge across the inlet, and a suitable terminal
and lainding connected by road to the highway system and open to
the public on equal terms.
        RIVERS AND HARBORS--PHILADELPHIA, PA., DISTRICT                      319

   Terminal facilities.-There are two :wharves located at Oak
Orchard, on Indian River Bay.
   Operation and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project. The controlling depth at mean low water (March
1936) were 1.0 foot across outer bar, 1.9 feet across inner bar; thence
to upper end of Indian River Bay 6.5 feet. There have been no costs
or expenditures on this project.
  Proposed operations.-It is proposed to apply the funds allotted
from the act of July 19, 1937, amounting to $160,000, together with
$160,000 additional to be contributed by local interests, to new work
dredging and jetty construction, under contract (February 1938-
June 1939).
  The sum of $123,000 can be profitably expended during the fiscal
year 1939 to completion, under contract, of new work dredging and
jetty construction. This work will complete the project.
                             Cost and financial summary

Cost of new work to June 30, 1937   _________
Cost of maintenance to June 30, 1937__------
      Net total expenditures-

Total amount appropriated to June 30, 1937
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-----------------------------------------$160, 000
Amount available for fiscal year 1938 1------------------------------__   160, 000

Amount (estimated) required to be appropriated for completion of
existing project 1-__-------                         --------            123, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work --------------------------------------               123, 000
  1In addition $160,000 to be contributed by local interests.
  2 Exclusive of available funds.

16. INLAND     WATERWAY FROM CHINCOTEAGUE BAY, VA., TO DELA-
                WARE BAY AT OR NEAR LEWES, DEL.

   Location.-This tidal waterway extends northerly from Chinco-
teague Bay, Va., following the waterways parallel with the Atlantic
Ocean through Virginia, Maryland, and Delaware, passing through
the neck of land at Ocean View, Del., and the land between Rehoboth
Bay and the headwaters of Lewes River, entering the Delaware Bay
at or near the town of Lewes, a total distance of about 70 miles.
 (See U. S. Coast and Geodetic Survey Charts Nos. 1218, 1219, and
1220.)
   Previous projects.-Adopted    by River and Harbor Act of
August 5, 1886, and modified by River and Harbor Act of July 13,
1892. The River and Harbor Act of March 3, 1905, repealed the
project. The cost and expenditures on the project prior to its being
repealed were $168,411.88 for new work and $25,330.42 for main-
tenance, a total of $193,742.30. For further details see page 382,
Annual Report for 1932.
   Existing project.-This provides for the maintenance of the three
bridges built by the Government at Ocean View, Del., under the pre-
      20196--37-pt. 1 --   21
320               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

vious project. The latest (1928) approved estimate for annual cost
of maintenance is $500. The existing project was adopted by the
River and Harbor Act of June 25, 1910 (H. Doc. No. 538, 59th Gong.,
1st sess.). The latest published map is printed in House Document
No. 128, Sixty-seventh Congress, second session.
   Terminal facilities.-There are 29 wharves and a number of land-
ing places, all of which are open to the public use free of charge.
The terminals are considered adequate for the existing commerce.
   Operations and result. during fiscal year.-Repairs, by hired
labor, to Cedar Neck and Jefferson Bridges at Ocean View, Del.,
were made in November and December 1936 at a cost of $521.45, for
maintenance. The expenditures were $523.26.
   Condition at end of fiscal year.-As the existing project is for
maintenance, it is impracticable to state the percentage of comple-
tion. The Cedar Neck and Jefferson Bridges were repaired in the
fall of last year and placed in a serviceable condition. The State.
of Delaware, in August 1928, completed a concrete bridge across
this waterway as part of its highway system from Ocean View to
Bethany Beach. This bridge is 80 feet south of the Government-
owned Ocean View Bridge, which has heretofore been maintained
by the Government but which has now been closed to highway
traffic. The total costs and expenditures were $11,200 for main-
tenance.
   Proposed operations.-It is proposed to apply the funds allotted
from the act of July 1937, amounting to $500, to repairing the
bridges throughout the year. The funds will be exhausted about
June 30, 1938.
   The sum of $4,000 can be profitably expended during the fiscal
year 1939 for the reconstruction of Cedar Neck and Jefferson
Bridges, by contract (July-September 1938).
                                               Cost and financial summary

Cost of new work to June 30, 1937----------------------------- $168, 411. 88
Cost of maintenance to June 30, 1937--------------------------   36, 530. 42

      Total cost of permanent work to June 30, 1937------------- 204, 942. 30
Net total expenditures----------------                           204, 942. 30
Total amount appropriated to June 30, 1937-                            942. 30
                                                                 2--------------------04,

           Fiscal year ending June 30                        1933              1934          1935          1936           1937

Cost of new work               ---------------------------                 ------------ ------------ ------------     ----------
Cost of maintenance__--------------------_                   $114. 89          $126. 69      $289. 61      $278. 85        $521. 45
Total expended--------------------------__                     116. 17           55. 99          360. 31    277. 04         523. 26
Allotted .......         .......---------------------------- -----------        300.00     ---              500.00


Balance unexpended July 1, 1936                                       $523.26
Gross amount expended--------------------------------------------523.      26

Amount allotted from War Department Civil Appropriation Act,'
approved, July 19, 1937-------------------------------------------      500. 00
Balance available for fiscal year 1938------- ------------- ------       500. 00
Amount that can be profitably expended in fiscal'year ending June 30,
                         1
1939, for maintenance .___._        --            ___-_-     --..    4, 000. 0C
   1 Exclusive of available funds.
            RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                            321

                                       17. COOPER RIVER, N. J.

   Location.-Rises in the eastern part of Camden County, N. J., flows
northwesterly about 13 miles, passing through the northern part of
the city of Camden, and empties into the Delaware River above
Cooper Point. (See U. S. Coast and Geodetic Survey Chart No.
295.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 70 feet wide through the bar outside of the mouth and
upstream to what was formerly Browning Chemical Works, about
1.7 miles. The mean range of tide is 6 feet at the mouth and 2 feet
at Stoys Landing, and the extreme range is about 10 feet.
    The estimate of cost for new work, made in 1895, was $35,000. The
latest (1929) approved estimate for annual cost of maintenance is
$13,500.
    The existing project was adopted by the River and Harbor Act of
June 3, 1896. (H. Doc. No. 176, 53d Cong., 3d sess., and Annual Re-
port for 1895, p. 1102 et seq.) The latest published map is in House
Document No. 134, Sixty-third Congress, first session.
    Terminal facilities.-There are 17 wharves, which practically form
a continuous wharfage on both sides of the stream through the city of
Camden. (See Port Series No. 4, Corps of Engineers.)
    Operations and results during fscal year.-A survey from Brown-
ing Chemical Works to the mouth was made in August 1936, at a cost
of $148.04, for maintenance. The expenditures were $8,257.10.
   Conditon at end of fscal year.-The existing project was completed
in 1920 at a saving of $1,898 under the estimated cost. The control-
ling depths at mean low water on June 30, 1937, were as follows:
from Delaware River to 600 feet below the upper end of project, 11.7
feet; thence to the upper end of the project, 7.3 feet. The total costs
and expenditures were $33,101.64 for new work and $105,256.01 for
maintenance, a total of $138,357.65.
   Proposed operations.-No funds are available, and no work is con-
templated during the fiscal years 1938 and 1939, as it is believed that
no maintenance will be necessary.
                                       Cost and financial summary
Cost of new work to June 30,1937 _--------------------------                                                   $33, 101. 64
Cost of maintenance to June 30, 1937---------------------------...                                             105,256.01
      Total cost of permanent work to June 30, 1937-------------- 138, 357. 65
Net total expenditures --------------------------------------- 138, 357. 65
Total amount appropriated to June 30, 1937-----------------___ 138, 357.65

         Fiscal year ending June 30                   1933          1934          1935              1936            1937


Cost of new work-................$                                                        --- ;                      $148.0
Cost of maintenance--... ....
                          -   ----. _ _                --                 -
                                                                  -___-____    -__$623. 71 $11, 280. 85              $148.04
Total expended..........---------------------------------------------              623. 71      3, 171. 79         8,257. 10
Allotted--...........---......--------------------- ----------   $27, 000. 00 -------        -12, 000 00           2,94740

Balance unexpended July 1, 1936_____________________________    $11, 204. 50
Deductions on account of revocation of allotment---------------   2,947. 40
      Net amount to be accounted for_-----------                                                           -     8,257. 10
Gross amount expended- -      ____--------
                             ---                                                        -    ----              - 8, 257. 10
322     REPORT OF' :CHIEF OF ENGINEERS, U. S. ARMY, 1937

                   18. BIG TIMBER CREEK, N. J.

  Location.-This creek is about 16 miles long, flows in a general
northwesterly direction, forming a portion of the boundary line
between Camden and Gloucester Counties, N. J., and enters the Dela-
ware River opposite. League Island, in the southern portion of Phila-
delphia, Pa. (See U. S. Coast and Geodetic Survey Chart No. 295.)
  Existing project.-This provides for a channel 10 feet deep at
mean low water and generally 75 feet wide from the 10-foot contour
in Delaware River up to Marters sand plant, a distance of 51/4 miles;
and 10 feet deep and 60 feet wide, thence to Clements Bridge, 13/4
miles. The mean range of tide at Westville, near the mouth, is 5.1
feet, at Clements Bridge, 4.3 feet; and at Chews Landing, 2.3 feet.
The extreme range of tide is from about 1 /2 feet below mean low
water to 2 feet above mean high water.
   The estimate of cost for new work, revised in 1935, is $104,500,
of which $50,000 has been contributed by local interests. The latest
(1935) approved estimate for annual cost of maintenance is $4,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 217, 70th Cong., 1st sess.), and modified by
the River and Harbor Act approved August 30, 1935, to extend the
project from Marters sand plant to Clements Bridge (Rivers and
Harbors Committee Doc. No. 15, 73d Cong., 1st sess.). The project
documents contain the latest published maps.
   Local cooperation.-The authorization for extending the channel
to Clements Bridge contains the requirement that local interests fur-
nish suitable spoil-disposal areas during initial construction and
future maintenance and give satisfactory assurances that suitable
wharves or landings will be provided at or near Clements Bridge.
This requirement has not yet been complied with.
   Terminal facilities.-There are no public wharves or landings
along the creek. Small landing docks have been built by owners of
power boats or pleasure craft for their personal use. It is expected
that the sand and gravel and other commercial interests using the
stream, as well as the municipalities, will build wharves.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 64
percent completed. The remaining portion is the dredging to project
dimensions from Marters sand plant to Clements Bridge. The con-
trolling depths at mean low water on June 30, 1937, were as follows:
From Delaware River to the mouth, 8.9 feet; thence to Westville,
10.0 feet; thence to Marters sand plant, 8.0 feet; and thence to Clem-
ents Bridge, 2.0 feet. The total costs and expenditures to the end of
the fiscal year, excluding $50,000 contributed funds, were $16,057.39,
for new work.
   Proposed operations.-The sum of $38,500 allotted during July 1937
will be applied to new work dredging to project dimensions from Mar-
ters sand plant to Clements Bridge, about 175,000 cubic yards, by
contract. This work will complete the project.
   No additional funds can be profitably expended during the fiscal
year 1939.
             RIVERS AND HARBORS-PHILADELPHIA, PA.,- DISTRICT                                                               323
                                           Cost and financial summary

Cost of new work to June 30, 1937------------------------------                                                    $16, 057. 39
Cost of maintenance to June 30, 1937------------------------------
      Total cost of permanent work to June 30, 1937--------------'                                                   16, 057. 39
Net total expenditures     ------------------------------------                                                    116, 057. 39

Total amount appropriated to June 30, 1937_--- --                               ------              _              116, 057. 39

        Fiscal year ending June 30                   1933           1934             1935                  1936          1937

Cost of new work....--------------------- $16,057. 39            ---------------------       ---    --- --      ..
Cost of maintenance ----.....
                         .          .
                              . . ---    . . . .                              ------------ ------------ _    _--------..........--
                                                                                                        -----------
Total expended         -----------------------
                  ...................              15, 947. 39      $110. 00                     ----------------------

Allotted -          ..-.--.
              -........-         .-                16, 057. 39.......          .................................


Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937                __---------------------------------                                         $38, 500. 00
Balance available for fiscal year 1938------------------------                                                      38, 500. 00
  1 In addition, $50,000 of contributed funds was expended for new work.

                                        19. WOODBURY CREEK, N. J.
   Location.-This creek rises on the boundary line between Camden
and Gloucester Counties and flows 6 miles in a general northwesterly
direction, emptying into the Delaware River about 9 miles below
Philadelphia, Pa. (See U. S. Coast and Geodetic Survey Chart No.
295.)
   Previous projects.-Adopted by River and Harbor Acts of August
2, 1882, and June 3, 1896. The total cost and expenditures were
$2,950.31 for new work. For further details see page 339, Annual
Report for 1932.
   Existing project.-This provides for a channel 6 feet deep at mean
low water from the 6-foot contour of Delaware River to Woodbury,
60 feet wide across the bar outside the mouth and up the river to the
white bridge, 11/2 miles; thence 40 feet wide to Woodbury, a farther
distance of 2    miles, including three cut-offs, which shortened the
distance 3,340 feet. The length of the section included in the project
is about 4 miles. The mean range of tide at the mouth is 5.7 feet
and at Woodbury 4.3 feet. The extreme tidal range is about 10 feet.
   The estimate of cost for new work, made in 1912, was $38,000, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $4,000.
   The existing project was adopted by the River and Harbor Act
of March 4, 1913 (H. Doc. No. 635, 62d Cong., 2d sess.). The latest
published map is in that document.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are five timber wharves on this stream
all being private property, except a municipal wharf at the foot o1
one of the streets. The facilities are considered adequate for the
existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1916, at a saving of $13,857 under the estimated cost. The
controlling depths at mean low water on June 30, 1937. were as
324             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

follows: From Delaware River to the mouth, 4.9 feet; thence to the
white bridge, 7.6 feet; thence to the red bridge, 3.9 feet; thence to
300 feet downstream from the highway bridge at Woodbury, 4.5
feet; and thence to the highway bridge, 1.3 feet. The costs and ex-
penditures were $24,142.70 for new work and $46,210.44 for mainte-
nance, a total of $70,353.14.
   Proposed operations.--No funds are available and no work is con-
templated during the fiscal year 1938.
   The sum of $10,000 can be profitably expended during the fiscal
year 1939, to be applied to maintenance dredging throughout the
length of the project, about 30,000 cubic yards, by contract (July-
October 1938).
                                     Cost and financial summary

Cost of new work to June 30, 1937--------------------------__                                                           $27, 093. 01
Cost of maintenance to June 30, 1937------------------------                                                             46, 210. 44

      Total cost of permanent work to June 30, 1937-------------73, 303. 45
Net total expenditures------------------------------------ 73,303. 45
Total amount appropriated to June 30, 1937--------------------73, 303. 45

            Fiscal year ending June 30                 1933             -1934               1935             1936               1937

Cost of maIntn anew
            work  e--------------------                            --       ------ I           00--0--
                                                                                            $10,"---
                                                                                                   -----                  ---



;Costal      enanded-----------------------$353.
          expof                                               14   -----------..             10,000-
Allotted.----....-..-. ---.-..           -353.
                                         -.....   -.          14        $10, 000       ..    .     .   ...          .

Amount that can be profitably expended
                                       in fiscal year ending June
   30,
    1939, for maintenance-------------------------------          $10, 000. 00
                                     20. MANTUA CREEK, N. J.

  Location.-This creek rises in Gloucester County, N. J., flows north-
westerly 161/2 miles and empties into the Delaware River about 10
miles below Philadelphia, Pa. (See U. S. Coast and Geodetic Survey
Chart No. 295.)
   Previous projects.-Adopted by River and Harbor Act of August
2, 1882, and modified in 1889. The cost and expenditures were $3,000
for new work. For further details see page 1784, Annual Report for
1915.
   Existing project.--This provides for a channel 12 feet deep at
mean low water and 100 feet wide from the Delaware River to the
Strathmann sand plant at Paulsboro, about 2 miles above the mouth,
thence 10 feet deep and 60 feet wide to Friars Landing, about 2,000
feet; thence 7 feet deep and 60 feet wide via cut-offs to Parkers
Landing, near Mount Royal; and the dredging of a cut-off 3 feet
deep and 50 feet wide, 9,000 feet above Berkeley (Mount Royal), the
removal of overhanging trees above Mount Royal; the construction
of stone-filled pile and timber jetties on both sides of the mouth; and
a dike across the old mouth 524 feet long. The length of the north
jetty is 1,578 feet. The south jetty is 1,454 feet long. The section of
the creek included in the project extends from the Delaware River
upstream 73/4 miles to 1 mile below the town of Mantua. The mean
       RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT             325
range of tide at the mouth is 5.2 feet; at Paulsboro, 5 feet ; at Mount
Royal, 4.6 feet; and at Mantua, 3.5 feet. The extreme tidal range
is about 10 feet.
    The. estimate of cost for new work, revised in 1935, is $170,030,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $4,000.
   The existing project was adopted by the following river and harbor
acts: The act of March 3, 1899, provided for all features of the proj-
ect except the dike across the old mouth and the 10- and 12-foot
channels (H. Doc. No. 123, 55th Cong., 2d sess., and Annual Report
for 1898, p. 1122). The dike was provided for by the act of March 2,
1907. The project was modified by the River and Harbor Act ap-
proved August 30, 1935, to provide for a channel 12 feet deep at
mean low water and 100 feet wide from the Delaware River to the
Strathmann sand plant at Paulsboro, about 2 miles above the mouth,
thence 10 feet deep and 60 feet wide to Friars Landing, about 2,000
feet (Rivers and Harbors Committee Doc. No. 14, 73d Cong., 1st
sess.). The latest published map of the whole creek is in House Docu-
ment No. 123, Fifty-fifth Congress, second session. A later map of
the portion from just below Mount Royal to Mantua is in House
Document No. 523, Sixty-first Congress, second session, and a map of
the section between Delaware River and Friars Landing is printed
in Rivers and Harbors Committee Document No. 14, Seventy-third
Congress, first session.
    Local cooperation.--The work authorized by the River and Harbor
Act of 1935 requires local interest to furnish necessary rights-of-way
and spoil-disposal areas free of cost to the United States. All prior
requirements have been fully complied with.
    Terminal facilities.-There are 10 wharves of pile and timber con-
struction on this stream.
    Operations and results during fiscal year.-Maintenance dredging,
by U. S. dredge Mantua, from the railroad bridge to the highway
bridge at Paulsboro, N. J., and of a shoal 1,000 feet above highway
bridge was commenced August 17, 1936, and was completed Septem-
ber 10, 1936. There were removed 20,939 cubic yards, place measure-
ment, of mud, sand and clay at a cost of $7,623.72 for maintenance.
The expenditures were $7,620.72.
    Condition at end of fiscal year.-The existing project is about 66
percent completed. The remaining portion is the dredging of the
channel to project dimensions from Delaware River to Friars Land-
ing. The controlling depths at mean low water on June 30, 1937,
were as follows: From Delaware River to the phosphate works,
12.8 feet; thence to the Pennsylvania Railroad bridge, 10.3 feet;
thence to Strathmann sand plant, 10.4 feet; thence to the fixed high-
way bridge at Mount Royal, 5.4 feet; and thence to Mantua, 1.0
feet.
    The total costs under the existing project were $109,958.52 for new
work and $79,736.42 for maintenance, a total of $189,694.94. The
expenditures were $189,691.94.
    Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1937, amounting to $3, to payment of accounts pay-
able. The sum of $40,000 allotted during July 1937 will be applied
to new work dredging to project dimensions from the Delaware
326                                         SARMY, 1937
           REPORT OF CHIEF OF ENGINEERS, U. S.

River to Friars Landing, about 134,000 cubic yards, by contract.
The proposed work will complete the project.
  No additional funds can be profitably expended during the fiscal
year 1939.
                                Cost and financial summary

Cost of new work to June 30, 1937--------------------------                               $112,958. 52
Cost of maintenance to June 30, 1937        -----------                                      9, 736. 42
                                                                                            7__________---
     Total cost of permanent work to June 30, 1937_...........       192, 694. 94
Minus accounts payable June 30, 1937------ ----------          -------      3.00

     Net total expenditures--------------------------------                                192, 691. 94
Unexpended balance June 30, 1937--------------------------------                                  3. 00

       Total amount appropriated to June 30, 1937__-- -----                         -     192, 694.94

       Fiscal year ending June 30           1933        1934           1935        1936          1937



                                                    -
Cost of new work----------..........-------------------------------- -------------
Cost of maintenance- . .               _......
                                   _ -----.---             ---__ ---...... .... ..- - $7, 623. 72
Total expended-..--.----------------- -----------   -----------   ------------------------       7,620. 72
Allotted--..---------------------- ------------------    $5,000 ------------     -- $5,000       7,623.72


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934 ---------    ---------------------------------                                $2, 947. 40
Amount allotted from War Department Appropriation Act approved
May 15, 1936------------ -----------------------------                                       6, 000. 00

     Amount to be accounted for----------------------------                                   8, 947.40
Deductions on account of revocation of allotment----------                                    1, 323. 68

      Net amount to be accounted for____      __----______--7,                                   623. 72
Gross amount expended-------------------------------------                                    7, 620.72

      Balance unexpended June 30, 1937--------- ----                                               3. 00
Outstanding liabilities June 30, 1937 -----------------------------                                3. 00

Anmount allotted from War Department Civil Appropriation Act
  approved July 19, 1937-----------------------------------                                  40, 000. 00
Balance available for fiscal year 1938------------------------                               40, 000. 00

                              21. OLDMANS CREEK, N. J.

   Location.-This creek rises in the boundary line between Gloucester
and Salem Counties, N. J., flows in a northwesterly direction 20 miles,
and empties into the Delaware River about 24 miles below Philadel-
phia, Pa. (See U. S. Coast and Geodetic Survey Chart No. 295.)
   Existing project.-This provides for a channel 6 feet deep at mean
low water from the 6-foot contour of the Delaware River to Pedrick-
town, a distance of 6 miles, thence 5 feet deep at mean low water to
Auburn, a farther distance of 9 miles; 100 feet wide across the bar
outside of the mouth, 75 feet wide thence to Pedricktown, and thence
40 feet wide to Auburn, including nine cut-offs, which shortened the
distance 4 miles, and a jetty at the mouth. The mean range of tide
is 6 feet at the mouth, 2.4 feet at Pedricktown, and 0.9 foot at Auburn.
The extreme range of tide is from 2 feet below mean low water to
about 2 feet above mean high water.
        RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                        327
   The estimate of cost for new work, revised in 1928, is $120,000. The
latest (1908) approved estimate for annual cost of maintenance is
$2,500.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doe. No. 1083, 60th Cong., 2d sess.). The latest
published map is in that project document.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are 11 wharves or landings on the creek
of pile and timber construction. They are privately owned, but
seven are open to the general public. No wharves have railroad con-
nection. The facilities are adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--About 26 percent of the project,
that is, all of the dredging contemplated, has been completed. The
uncompleted portion of the project is the construction of a jetty at
the mouth, which it is not proposed to undertake at present. The con-
trolling depths at mean low water on June 30, 1937, were as follows:
From Delaware River to the mouth, 3.1 feet; thence to the highway
bridge at Nortonville, 5.8 feet; thence to Pedricktown, 5.9 feet;
thence to 1,500 feet below the fixed highway bridge at Auburn, 2.4
feet; and thence to the fixed highway bridge, 0.5 foot.
   The total costs and expenditures were $31,188.43 for new work and
$19,511.57 for maintenance, a total of $50,700.
   Proposed operations.-No funds are available, and no work is
contemplated during the fiscal year 1938.
   The sum of $12,000 can be profitably expended during the fiscal
year 1939, to be applied to maintenance dredging between the Dela-
ware River and Pedricktown, by contract, about 40,000 cubic yards
 (October-December 1938).
                          Cost and financial summary

Cost of new work to June 30, 1937------------------------------   $31, 188. 43
Cost of maintenance to June 30, 1937---------------------------19,     511. 57
      Total cost of permanent work to June 30, 1937-----_-- -----  50, 700. 00
Net total expenditures------------------------------------------50, 700. 00
Total amount appropriated to June 30, 1937------------------------ 50, 700. 00
Amount (estimated) required to be appropriated for completion of
existing project--------------------------------------------           88, 800. 00
Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance ---------------------------------    __    _     12, 000. 00

                         22. RACCOON CREEK, N. J.

  Location.-This creek rises in Gloucester County, N. J., flows north-
Westerly 16 miles, and empties into the Delaware River about 20 miles
below Philadelphia, Pa. (See U. S. Coast and Geodetic Survey Chart
No. 295.)
  Previous projects.-Adopted by the River and Harbor Act of
August 2, 1882. The cost and expenditures were $757.23 for a survey
and charged to new work. For further details see page 1784, Annual
Report for 1915.
  Existing project.--This provides for a channel 7 feet deep through-
out at mean low water, 75 feet wide from the 7-foot contour :i
328      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Delaware River to Bridgeport, a distance of 13 miles; thence 60 feet
wide to Springers wharf, a farther distance of 31/4 miles; and thence
40 feet wide to Swedesboro, a farther distance of 43/4 miles; with a
stone-filled pile-and-timber jetty at the mouth 950 feet long, and a
cut-off at Molonox Shoal, which shortened the distance three-fourths
mile. The mean range of tide is 5.3 feet at the mouth and 4.4 feet at
Swedesboro. The extreme range of tide is 10 feet.
   The estimate of cost for new work, made in 1913, was $106,535,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $3,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 13, 1902, provided for all features of the
existing project except the 7-foot depth above Springers wharf, the
dike or jetty at the mouth, and the cut-off at Molonox Shoal (H. Doc.
No. 231, 56th Cong., 1st sess., and Annual Report for 1900, p. 1590).
The act of March 2, 1907, provided for the cut-off at Molonox Shoal,
and the act of March 2, 1919, provided for the 7-foot depth above
Springers wharf, and the jetty at the mouth (H. Doc. No. 800, 63d
Cong., 2d sess.). The latest published map of the mouth and the
upper section of the creek is in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 11 wharves of pile-and-timber con-
struction, all privately owned. The facilities are considered adequate
for the existing commerce.
   Operations and results during fiscal year.-Maintenance dredging,
under contract, of the entrance channel was commenced October 27,
1936, and completed May 15, 1937. There were removed 59,037 cubic
yards, place measurement, of mud, sand, and clay at a cost of $28,-
908.74, for maintenance. Maintenance dredging, under contract, be-
tween the fixed railroad bridge and the fixed highway bridge at
Swedesboro, N. J., was commenced April 8, 1937, and was completed
May 27, 1937. There were removed 11,460 cubic yards, place measure-
ment, of mud, sand, and clay at a cost of $7,775.50, for maintenance.
The total costs for the fiscal year were $36,684.24, for maintenance.
The expenditures were $36,575.30.
   Condition at end of fiscal year.-The existing project was completed
in 1922 at a saving of $23,627 under the estimated cost. The con-
trolling depths at mean low water on June 30, 1937, were as follows:
From Delaware River to the mouth, 8.2 feet; thence to Springers
wharf, 6.1 feet; and thence to Swedesboro, 3.9 feet.
   The total costs were $82,907.73 for new work and $119,438.82 for
maintenance, a total of $202,346.55. The total expenditures were
$202,237.61.
   Proposedoperations.-It is proposed to apply the funds unexpended
June 30, 1937, amounting to $1,248.38, as follows:
Accounts payable June 30, 1937_
                              --------------------------------      $108. 94
Maintenance: Surveys and channel examinations throughout the year_ 1, 139. 44
      Total----------------------        ------------------------    1, 248. 38
  The sum of $20,000 can be profitably expended during the fiscal
year 1939, to be applied to maintenance dredging between Springers
wharf and Swedesboro, about 60,000 cubic yards, by contract (July-
December 1938).
                   RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                                         329
                                                             Cost and financial siummary

Cost of new work to June 30, 1937-----                                                                                                          664. 96
                                                                                                                                           $--------------------
Cost of maintenance to June 30, 1937, - ___.----.--------..                                                                                119, 438. 82

     Total cost of permanent work to June 30, 1937-------------                                                                           203, 103.78
Minus accounts payable June 30, 1937---------    ----------------                                                                              108.94

     Net total expenditures-------------- --              ---------                                                                       202, 994. 84
Unexpended balance June 30, 1937-----------------------------1,                                                                                248. 38

             Total amount appropriated to June 30, 1937---_____---204, 243. 22

               Fiscal year ending June 30                                   1933            1934                  1935           1936                 1937

Cost of new work-.........................                               ----------------            -     .....-
                                                                                                         -----       ---------------           -     --
Cost of maintenance_......................                                ...      _ -     -----         -. ----. ----.-.   - .-----    .- .        $36, 684.24
Total expended----                    .---------------------                $383. 57 ---      ----
                                                                                                .         -----          --.------                   36, 575. 3
Allotted---------------------------.............................   ---     -350.46   -----------------------                     $17, 000           20,823.68


Balance unexpended July 1, 1936__                              $17, 000. 00
Amount allotted from War Department Appropriation Act approved
  May 15, 1936       -------------------------------------      20, 823. 68
      Amount to be accounted for __ ___------__----_____-                                                                                      37, 823. 68
Gross amount expended___-      ________--______-                                                                                               36, 575. 30
     Balance unexpended June 30, 1937_----------           -___-_ 1, 248. 38
Amount covered by uncompleted contracts-------------------           108. 94

               Balance available June 30, 1937 ----                                                  -------                 ___                   1, 139. 44

Amount that can be profitably     expended in fiscal year
                           1- - - - - - - - - - - - - - - - -
                                                                  ending June
                                                              -- --- --- --- --
30, 1939, for maintenance                                                                                                                     20, 000. 00
    1Exclusive of available funds.

                                                               23. SALEM RIVER, N. J.

  Location.-Rises in Salem County, N. J., flows westward 10 miles,
thence southward 13 miles to the city of Salem, N. J., where it is
joined by Little Salem River, or Fenwick Creek, from the eastward,
and thence westward 3 miles, emptying into the Delaware River
about 45 miles below Philadelphia, Pa. (See U. S. Coast and Geo-
detic Survey Chart No. 294.)
  Previous projects.-The River and Harbor act of July 11, 1870,
provided for a survey and the original project was adopted by River
and Harbor act of March 3, 1871, and modified in 1878, and a subse-
quent project adopted by River and Harbor act of March 2, 1907.
The cost and expenditures were $55,809.34 for new work and $48,000
for maintenance, a total of $103,809.34. For further details see page
1784, Annual Report for 1915, and page 349 of Annual Report for
1924.
  Existing project.-This provides for a channel 12 feet deep at
mean low water, 150 feet wide from deep water in the Delaware
River through Salem Cove, and thence 100 feet wide to the fixed
highway bridge in the city of Salem, including a cut-off to eliminate
a large horseshoe bend just below the city of Salem. The length of
the section included in the project is about 4 miles. The mean range
330     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of tide is 6 feet, and the extreme range is from 1 foot below mean
low water to about 2 feet above mean high water.
   The estimate of cost for new work, revised in 1927, is $175,000
 (one-half of which is to be contributed by local interests), exclusive
of amounts expended under previous projects. The latest (1927)
approved estimate for annual cost of maintenance is $8,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1925 (H. Doc. No. 110, 68th Cong., 1st sess.). The latest
published map is in that document.
   Local cooperation.-The existing project requires that local inter-
ests contribute 50 percent of the estimated cost of new work and that
a right-of-way for the proposed cut-off shall be conveyed to the
United States free of cost. The contributions thus far made provide
the right-of-way for the cut-off and for 50 percent of the cost of the
12-foot channel up to a point 225 feet above the county (Penns Neck)
highway bridge, amounting to $51,825.10, of which $27,905.82 was
contributed by the State of New Jersey, $19,932.73 by the county of
Salem, and $3,986.55 by the city of Salem.
   Terminal facilities.-There are 13 wharves on the river, all at
Salem, N. J. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.--A survey between
Penns Neck bridge and the fixed highway bridge at Salem, N. J.,
was made during February and March 1937, at a cost of $279.96 for
maintenance. A reimbursement of $3,311.47 for excess cost of main-
tenance in previous years was received. The total cost of mainte-
nance for the fiscal year was minus $3,031.51. The expenditures
were minus $3,033.87.
   Condition at end of fiscal year.-About 60 percent of the existing
project has been completed. The uncompleted portion of the proj-
ect includes the dredging of the section commencing about 225 feet
above the county (Penns Neck) highway bridge to the fixed high-
way bridge at Salem. The controlling depths at mean low water on
June 30, 1937, were as follows: From Delaware River across Salem
Cove to cutoff, 9.8 feet; thence to Penns Neck Bridge, 12.7 feet; and
thence to the fixed highway bridge at Salem, 9.1 feet. The total
costs under the existing project, excluding $51,825.10 contributed
funds expended for new work, were $51,825.09 for new work and
$21,743.40 for maintenance, a total of $73,568.49. The expenditures,
excluding $51,825.10 contributed funds, were $73,566.13.
  Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1937, amounting to $9,033.87 as follows:
Accounts payable June 30, 1937---------------------------------   $2..36
Maintenance: Dredging between Penns Neck bridge and the fixed
  highway bridge at Salem under contract in progress to be com-
  pleted in September 1937-----  ----------------------------- 9,031.51

      Total      ----   ----------------------------            9, 033.87
  No funds can be profitably expended during the fiscal year 1939,
as it is believed no maintenance will be necessary.
              RIVERS AND HARBORS-PHILADELPHIA,                                      PA., DISTRICT                   331

                                      Cost and financial summary

Cost of new work to June 30, 1937--------------- -------------                                        1$107, 634. 43
Cost of maintenance to June 30, 1937---------------------------                                          69, 743. 40

     Total cost of permanent work to June 30, 1937----------                                                 77, 377.83
Minus accounts payable June 30, 1937-------------------------                                                      2. 36

     Net total expenditures---------------------------------                                                177, 375. 47
Unexpended balance June 30, 1937----------------------------                                                  9,033. 87

         Total amount appropriated to June 30, 1937------------                                            186, 409. 34

   Fiscal year ending June 30              1933             1934             1935              1936              1937


Cost of new work ...            ____ _    __      __.        -----      -------------
                                                                                  .       --------------
                                                                                             ..---          --------------
Cost of maintenance.__-__            ____.---..---. -    $19, 748. 90       $1,851.10---------------$3, 031.51
                     ------------------
Total expended-- ......      ___6,                            110. 37       15, 489. 63   --------------        -3, 033. 87"

Allotted...                                           35, 000. 00
                   -- ___.................................                -13, 400. 00       $16, 000.00       -10, 000. 00


Balance unexpended July 1, 1936-------------------------                                                   $16, 000. 00
Deductions on account of revocation of allotment                                                                 000. 00:
                                                                                                             1-----------------0,

      Net amount to be accounted for--------------------------                                                6, 000. 00h
Gross amount expended_ ----_-----------------_         $277. 60
Less reimbursements collected------------------------ 3,311. 47
                                                                                                            -- 3, 033.8T

      Balance unexpended June 30, 1937- -----------------------__                                             9, 033. 87
Outstanding liabilities June 30, 1937--------------------    $2.36
Amount covered by uncompleted contracts---------          8,255. 52
                                                                                                              8,257. 88'

         Balance available June 30, 1937-------- -_-----           _                               -__-          775.99
Amount (estimated) required to be appropriated for completion of
existing project - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 36, 000. 00
   1 In addition, $51,825.10 of contributed funds was expended for new work.
   2 Exclusive of available funds and exclusive of $35,675 to be contributed.

                                    24. COHANSEY RIVER, N. J.

   Location.-This river rises in Salem County, N. J., flows southerly
and southwesterly thl ough Cumberland County 261/2 miles and
empties into the Delaware Bay about 62 miles below Philadelphia,
Pa. (See U. S. Coast and Geodetic Survey Chart No. 1218.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1873, and modified in 1879. The cost and expenditures
prior to the adoption of the existing project were $36,000 for new
work. For further details, see page 1785, annual report for 1915.
   Existing project.-This provides for a channel 100 feet wide and
12 feet deep from that depth in Delaware Bay through a neck of'
land at the mouth, to the south side of Glass Street, Bridgeton, with
a turning basin of the same depth, 250 feet wide and 800 feet long,.
0.2 mile below Glass Street; thence a channel 8 feet deep to Com-
merce Street Bridge in Bridgeton, with widths of 100 feet below
and 75 feet above Broad Street. The mean range of tide at the
mouth is 5.7 feet; at Greenwich 5.3 feet; at Fairton 5.4 feet; and
332     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

at Bridgeton 6.5 feet. The extreme range of tide is from 2 feet
below mean low water to 3 feet above mean high water.
   The estimated cost for new work, revised in 1937, is $140,000
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $9,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1907, which provided for a channel 7 feet deep to the
nail works bridge (H. Doc. No. 645, 59th Cong., 1st sess.), and
modified by the River and Harbor Act approved August 26, 1937, to
provide for the present project dimensions, and the abandonment of
the improvement above Commerce Street. (Senate Committee
Print. 75th Cong., 1st sess.) The latest published maps are in the
project documents.
   Local cooperation.-The work authorized by the River and Harbor
Act of August 26, 1937, is subject to the condition that local inter-
ests furnish, free of cost to the United States, suitable spoil-disposal
areas for new work and for subsequent maintenance as required.
All prior requirements have been fully complied with.
   Terminal facilities.-There are 22 wharves on this river, of which
16 are at Bridgeton and 6 at Greenwich piers. Three wharves at
Bridgeton and one at Greenwich piers have direct rail connections.
A marine railway is located at the latter place.
   Operations and results during fiscal year.-Maintenance dredging
under contract, from Commerce Street Bridge to a point 1,000 feet
downstream from Broad Street Bridge, Bridgeton, N. J., was com-
menced May 29, 1937, and was in progress at the end of the fiscal
year. There were removed 10,554 cubic yards, place measurement,
of mud, sand, and clay at a cost of $8,749 for maintenance. The ex-
penditures were $3,388.18.
   Condition at end of fiscal year.-The existing project is about 39
percent completed. The remaining portion is the deepening of the
channel from 7 to 12 feet deep from Delaware Bay to the south side
of Glass Street at Bridgeton and to 8 feet deep thence upstream to
Commerce Street Bridge, and dredging the turning basin to project
dimensions. The controlling depths at mean low water on June 30,
1937, were as follows: From Delaware Bay to the mouth, 6.5 feet;
thence to Stony Point, 8.5 feet; and thence to Commerce Street
Bridge at Bridgeton, 6.2 feet.
   The total costs under the existing project were $48,578.89 for new
work and $101.270.11 for maintenance, a total of $149,849. The ex-
penditures were $144,488.18.
   Proposed operations.-It is proposed to apply the funds unex-
pended June 30. 1937, amounting to $13,111.82, as follows:
Accounts payable June 30, 1937------------------------------ $5, 360. 82
Maintenance: Dredging from Commerce Street Bridge to Broad
  Street Bridge under contract in progress, to be completed July
  1937------------------------------------------------------     7, 751.00

      Total---------------------------------------------------   13,111. 82
   The sum of $91,000 can be profitably expended during the fiscal
year 1939, to be applied to new work dredging to project dimen-
sions from Delaware Bay to Commerce Street Bridge at Bridgeton,
about 237,000 cubic yards, by contract (July-December 1938). The
proposed work will complete the project.
                RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                      333
                                                 Cost and financial summary

Cost of new work to June 30, 1937-------------------------$84, 578.89
Cost of maintenance to June 30, 1937-- .. ...------------------ 101, 270.11
      Total cost of permanent work to June 30, 1937                                           -----------                185,849.00
Minus accounts payable June 30, 1937-----------------------                                                               5, 360. 82

      Net total expenditures- --- __-_-_--...-- __----                                                                  180, 488. 18
Unexpended balance June 30, 1937 --------------------------                                                             13,111. 82
            Total amount appropriated to June 30, 1937_-------.                                                         193, 600.00

           Fiscal year ending June 30                      1933             1934           1935                1936              1937


Cost of new work--------                             ---------------------------------------                             ------------
Cost of maintenance-,.------------------                      --- --     $34,258.53        $741.47         _----_-$8,749.00

Total expended----------......--------........         ------------       34, 250. 96         749.04   -------                   3,388. 18

Allotted.................-------------------------------------- 38,000.00               -3,000.00          $27,000.00         -10, 500. 00


Balance unexpended July 1, 1936---------------------------                                                             $27, 000.00
Deductions on account of revocation of allotment -------------                                                      -10,    500. 00

      Net amount to be accounted for                                                                                       6, 500. 00
                                                                                                                          1------------------------
Gross amount expended-------------------------------------                                                                 3, 388. 18

     Balance unexpended June 30, 1937 ---------------------                                                               13, 111. 82
Amount covered by uncompleted contracts---------------                                                                    13, 111. 82

Amount (estimated) required to be appropriated for completion of
                      -- - -- - - - --- ---- --- - - -
existing project 1 -                                         __                                                          91, 000.00
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for new work 1-----                                  ----                    -            -                  91, 000. 00
   1 Exclusive of available funds.

                                          25. COLD SPRING INLET, N. J.

    Location.-Located in Cape May County, southern New Jersey,
  about 3 miles east of Cape May city and about 16 miles northeast of
Delaware Breakwater. The inlet connects Cold Spring Harbor with
the Atlanitic Ocean and is about 1 mile in length. (See U. S. Coast
and Geodetic Survey Charts Nos. 234 and 1219.)
    Existing project.-This provides for a channel 25 feet deep at
mean low water and 400 feet wide through the inlet, a distance of 1
mile, protected by two parallel jetties 700 feet or more apart. The
east jetty is a rubble mound 4,548 feet long. The west jetty is 4,410
feet long, of which 2,000 feet at the inner end is of stone-filled pile
and timber construction and the outer 2,410 feet is a rubble mound.
The mean range of tide is 41/2 feet, and the extreme tidal range is
very great, due to storms at sea, the extent of which has not been
recorded.
   The estimate of cost for new work, made in 1906, was $1,311,000,
including $100,000 contributed by local interests. The latest (1928)
approved estimate for annual cost of maintenance is $20,000.
   The existing project was adopted by the River and Harbor Act of
lMarch 2, 1907 (H. Doc. No. 388, 59th Cong., 2d sess.). The latest
published map is in the annual report for 1911, page 1382.
334               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-All cooperation has been completed, except
the work of deepening and enlarging the inner harbor, awhich is 80
percent completed.
   Terminal facilities.-There are 25 wharves or landings, 1 coaling
pier, and 2 marine railways served by this waterway, including those
owned by the Navy Department. The wharves are indirectly con-
nected with two railroad systems and are considered adequate for
existing commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-- he existing project was com-
pleted in 1917 at a saving of $331,725 under the estimated cost. The
controlling depth at mean low water on June 30, 1937, was 18.8
feet from the Atlantic Ocean to the inner limit of the project. The
costs and expenditures were $879,274.62 for new work and $439,-
521.30 for maintenance, a total of $1,318,795.92 from United States
funds. In addition, $100,000 was expended for new work from con-
tributed funds.
   Proposed operations.-No funds were unexpended June 30, 1937.
It is proposed to apply the funds allotted from the act of July 19,
1937, amounting to $30,000, to maintenance dredging throughout the
project, by dredge Comstock (October-November 1937).
   No funds can be profitably expended during the fiscal year 1939,
as it is believed no maintenance will be necessary.
                                                Cost and financial summary

Cost of new work to June 30, 1937   ___________                                                      '$879, 274. 62
Cost of maintenance to June 30, 1937--------------------------                                            439, 521. 30

      Total cost of permanent work to June 30, 1937-- ----------                                     1, 318, 795. 92
Net total expenditures--------------------------------------                                         1,318, 795. 92
Total amount appropriated to June 30, 1937--------------------                                       1,318, 795. 92

   Fiscal year ending June 30                      1933            1934        1935          1936              1937


Cost of new work             ..---------..
                                   .. . . . . ... . . . . . .. . . . . . .
                                                                                                               ---------
                         ----------


Cost of maintenance.-----------   $147,099.54  -$18, 778.18        $500.95                 $25, 000.00::--

Total expended---.............----------.....
                                          ---    149, 725. 56   -20, 135. 83     717. 39    25, 000.00         --
Allotted      _...._------------------           100, 000.00       ---------
                                                                 ----   -19,904.08          25, 000. 00    .    __



Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------- ------------     --                                                $30, 000
Amount available for fiscal year 1938---------------------------                                                30, 000
    SIn addition $100,000                 was expended from contributed funds.

                                                26. ABSECON INLET, N. J.

  Location.-This inlet is located on the coast of New Jersey about
65 miles north of Delaware Breakwater, between Brigantine Beach
on the north and Absecon Beach on the south. It forms the entrance
to the harbor at Atlantic City, N. J. (See U. S. Coast and Geodetic
Survey Chart No. 1217.)
  Previous project.-Adopted by the River and Harbor Act of July
25, 1912. The project was completed in 1916. The cost and expendi-
ture prior to beginning work on the existing project (expenditures on
which began in 1923) were $226,496.89 for new work and $235,785.61
        RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                  335
for maintenance, a total of $462,282.50. (For further details see An-
nual Report for 1936, p. 319.)
   Existing project.-This provides for obtaining and maintaining
by dredging an entrance channel 20 feet deep at mean low water and
400 feet wide. The length of channel included in the project is 1
mile. The mean range of tide is 41/2 feet. The extreme range of
tide, due to ocean storms, is very great, but its full extent is not
known.
   The estimate of cost for new work, revised in 1928, is $500,000.
The latest (1922) estimate for annual cost of maintenance is $50,000.
It is provided in the project that should the channel at any time
have a deleterious effect on the Atlantic City beach, work upon the
improvement may cease, it being understood that the project is
adopted on the basis that the interests of the beach in front of the
city are superior to those of the inlet.
   The existing project was adopted by the River and Harbor Act
of September 22, 1922 (H. Doc. No. 375, 67th Cong., 2d sess.). The
latest published map is contained in the Annual Report for 1887,
page 818.
   Terminal facilities.-There are nine wharves served by this im-
provement; one is Government owned, six are privately owned and
open to the general public use upon payment of moderate wharfage,
and two are publicly owned. Three of the wharves, have direct
railroad connection. There is also a continuous line of piers or land-
ing places for pleasure craft on both sides of the large basins which
indent the south shore of the inner channel. There are three ship-
yards and three marine railways at this locality. The facilities are
considered adequate for the existing commerce.
   Operations and results during fiscal year.-The seagoing hopper
dredge Comstock was operated from February 25, 1937, to the end
of the fiscal year in maintenance dredging of the entrance channel.
A total of 414,533 cubic yards, binll measurement, of sand was removed
at a cost of $91,271.26. An increase adjustment of $1,182.07 was
made in cost of maintenance dredging by seagoing hopper dredge
Absecon in prior years.
   The total costs during the year were $92,453.33 for maintenance.
The expenditures were $74,279.56.
   Condition at end of fiscal year.-The existing project is about 43
percent completed. The work to be done to complete the project
is to continue dredging the channel to project dimensions across the
ocean bar. The controlling depth at mean low water on June 30,
1937, was 19.7 feet in the channel across the ocean bar. The costs
were $208,647.66 for new work and $312,238.20 for maintenance, a
total of $520,885.86. The expenditures were $498,815.29.
   IProposed operations.-It is proposed to apply the funds unex-
pended June 30, 1937, amounting to $30,799.31, together with $60,000
allotted from the act of July 19, 1937, to operation of Government
plant for maintenance dredging as follows:
Accounts payable June 30, 1937_______________________________ $22, 070. 57
Maintenance: Dredging with dredge Comstock in the channel across
  the inlet bar, including surveys, July-September 1937-   _     68, 728. 74

      Total               _-----------______-_           _         90, 799. 31
      20196-37-pt. 1-22
.336            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The sum of $100,000 can be profitably expended during the fiscal
year 1939, for maintenance dredging with Government plant, includ-
ing surveys.
                                          Cost and financial summary

Cost of new work to June 30, 1937-__----------------------  $435, 144. 55
Cost om maintenance to June 30, 1937----------------------- 548; 023. 81

     Total cost of permanent work to June 30, 1937                                                           983, 168. 36
Minus accounts payable June 30, 1937--------------------                                                      22, 070. 57

     Net total expenditures ------------------------                                                        961, 097. 79
Unexpended balance June 30, 1937       ---------------------------                                           30,799. 31

          Total amount appropriated to June 30, 1937                               _..--          .-.. 991, 897. 10

          Fiscal year ending June 30                       1933             1934      1935           1936            1937

Cost ofnew work--.................-                                       -- - -                                  -- - -
Cost of maintenance----------------- ------------ ----------- $37, 663.37 $174,399. 55                             $92,453.33

Total expended--------.....................----.....--.....--------------------     20, 508. 35   180, 412. 78      74, 279. 56
Allotted--------...    --------------------------------------                      186, 000. 00   20, 000. 00      100, 000.00


Balance unexpended July 1, 1936_                              -
                                                    .___.---------------$5, 078. 87
Amount allotted from War Department Appropriation Act approved
  May 15, 193      ------------------------------------------          100,000.00

      Amount to be accounted for -----------------   _____                                                   105, 078: 87
Gross amount expended    --------------------------$75, 371.97
Less reimbursements collected-------     -----------  1,092. 41
                                                                                                                 74,279. 56

      Balance unexpended June 30, 1937 -------------------                                                       30, 799. 31
Outstanding liabilities June 30, 1937 ----------       --------                                                  22, 070. 57

     Balance available June 30, 1937--------- __       ---
                                                   ________-8, 728. 74
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---   -----------------              60,000.00

          Balance available for fiscal year 1938---------------------                                            68, 728. 74

Amount (estimated) required to be appropriated for completion of
                  1 - - - - - -- - - -
existing project '
                                          - -
                                                  ---
                                                           - - - - - -
                                                                               __                           30 0 ,000 . 0 0
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance         1 - -- - - - - -   -- -
                                                          _______  ______ __
                                                                             -
                                                                                                             100, 000. 00
   1 Exclusive of available funds.

                                        27. ABSECON CREEK, N. J.

    Location.-Rises in and flows easterly 5 miles through Atlantic
County, N. J., emptying into Absecon Bay about 5 miles northwest
of Atlantic City. (See U. S. Coast and Geodetic Survey Chart No.
1217.)
   Existing project.-This provides for a channel 5 feet deep at mean
low water 80 feet wide from deep water in Absecon Bay across the
flats to the mouth of the creek, a distance of 1 mile, thence 50 feet
wide to the highway bridge at Absecon village, a farther distance of
2 miles, including a turning basin at the head of navigation. The
mean range of tide is 4 feet. The extreme range of tide is from 1
ifoot below mean low water to about 1 foot above mean high water.
           RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                   337
    The estimate of cost for new work, made in 1911, was $15,000. The
latest (1928) approved estimate for annual cost of maintenance is
$2,500.
    The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 71, 62d Cong., 1st sess.). The latest pub-
lished map is in that document.
    Terminal facilities.-There are four pile and timber wharves and
landings on this stream. The facilities are considered adequate for
,existing commerce.
    Operations and results during fiscal year.-No operations were in
progress and no expenditures were made.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1913 at a saving of $3,065 under the estimated cost. The
controlling depths at mean low water on June 30, 1937, were as
follows: Across the flats in Absecon Bay to the mouth, 1.7 feet; thence
to the turning basin at Absecon, 4.5 feet; and thence to the highway
bridge, 2.8 feet. The costs and expenditures were $11,934.96 for new
work and $55,765.04 for maintenance, a total of $67,700.
    Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1938.
    The sum of $15,000 can be profitably expended during the fiscal year
1939, to be applied to maintenance dredging in the entrance channel
and shoals within the creek, about 40,000 cubic yards, by contract
  (July-November 1938).
                                      Cost and financial summary
Cost of new work to June 30, 1937--      ------------------------                                     $11, 934. 96
Cost of maintenance to June 30, 1937-----------------------                                            55, 765. 04
      Total cost of permanent work to June 30, 1937                                                   8__-------____
                                                                                                      67, 700. 00
Net total expenditures     ----------------------------                                               67, 700. 00
Total amount appropriated to June 30, 1937-------------------                                         67, 700. 00

         Fiscal year ending June 30                 1933         1934             1935      1936           1937

Cost of new work-------                         -----------     ------            ------    -------
Cost of maintenance........------    ----------------------   $15, 131. 22    $2,868. 78

Total expended-.--...---------------- ------                    2,842. 86     15, 157. 14
            -- -----------------------
Allotted...----                                     --------......
                                                                18,000.00    ..


_Amount that can be profitably expended in fiscal year ending June 30,
  1939, for maintenance------------------------------------         -- $15, 000
                                    28. TUCKERTON CREEK, N. J.

   Location.-Rises in Ocean County, N. J., flows southeasterly 3
miles, and empties into Little Egg Harbor about 8 miles north of
Little Egg Inlet. (See I. S. Coast and Geodetic Survey Chart No.
1216.)
  Existing project.-This provides for a channel 6 feet deep at mean
low water, 80 feet wide from the head of Marchelder Channel in
Little Tuckerton Bay, about 11/2 miles to the mouth of the creek;
thence up the creek, 75 feet wide, 1 mile to Parkers Landing; thence
60 feet wide five-eighths mile to West Tuckerton Landing; thence
5 feet deep at mean low water and 60 feet wide three-eighths mile
 338               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

to just above Scow Landing; and thence 3 feet deep at mean low
water and 40 feet wide one-eighth mile to the Milldam at Tuckerton.
The length of the section included in the project is about 31/ miles.
The mean- range of tide throughout the creek is 21/2 feet. The
extreme range of tide, due to winds, is from 1 foot below mean low
water to 1 foot above mean high water.
   The estimate of cost for new work, made in 1900, was $61,380. The
latest (1928) approved estimate for annual cost of maintenance is
$5,000.
   The existing project was adopted by the River and Harbor Act
of June 13, 1902 (H. Doc. No. 274, 56th Cong., 1st sess.); the River
and Harbor Act of March 3, 1905, substituted for the channel from
the mouth of the creek to Gaunts Point a channel from the mouth of
the creek across Little Tuckerton Bay to the head of Marchelder
Channel. (The latest published map is in H. Doc. No. 1040, 64th
Cong., 1st sess.)
   Terminal facilities.-There are 12 wharves of ordinary pile-and-
timber construction. The wharfage facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.--No operations were in
progress. Expenditures amounting to $7,790.31 were for payment
of outstanding liabilities on June 30, 1936.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1925 at a saving of $1,138 under the estimated cost. The
controlling depths at mean low water on June 30, 1937, were as
follows: Across the bay outside the mouth and within the creek to
Tuckerton Yacht Club, 6.3 feet; thence to Parkers Landing 3.8 feet;
thence to Scow Landing, 4.0 feet; and thence to the mill dam at
Tuckerton, 3.6 feet. The costs and expenditures were $60,242.16
for new work and $118,204.08 for maintenance, a total of $178,446.24.
   Proposed operations.-No funds were unexpended June 30, 1937.
It is proposed to apply the funds allotted from the act of July 19,
1937, amounting to $15,000, to maintenance dredging in the entrance
channel and shoals within the creek, about 40,000 cubic yards, by
contract (August-December, 1937)
   No funds can be profitably expended during the fiscal year 1939, as
it is believed no maintenance will be necessary.
                                             Cost and financial summary
Cost of new work to June 30, 1937___- _______________________                                                            $60, 242.16
Cost of maintenance to June 30, 1937_______________________                                                              118, 204.08
      Total cost of permanent work to June 30, 1937 ----------   178, 446. 24
Net total expenditures__________________________                 178, 446. 24
Total amount appropriated to June 30, 1937-__- --   -__ _ ___---178, 446.24

            Fiscal year ending June 30                        1933                  1934            1935          1936            1937

Cost of new work--...-          -----               ---------------------
Cost of maintenance--- ..........--------..------       -----------------------                 ------------   $15,066.24   ..
Total expended...........-------..--.....--------------          ----------------------------                   7, 275.93        $7, 790. 31
        ............
Allotted_                                      ....... _15,                                                       086. 03          -19. 79
        RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                          339
Balance unexpended July 1, 1936 --------------- --------------    $7, 810. 10
Deductions on account of revocation of allotment------------------     19. 79

      Net amount to be accounted for-----------------                      7, 790. 31

Gross amount expended --__-__---____------------     $8, 390. 31
Less reimbursements collected------------------------600. 00
                                                                           7, 790. 31

Amount allotted from War Department Civil Appropriation             Act
  approved July 19, 1937---------- -----------------------                15, 000. 00
Balance available for fiscal year 1938_--------------------------         15, 000. 00

                         29. BARNEGAT INLET, N. J.

   Location.-This inlet is located on the east coast of New Jersey,
about 50 miles south of Sandy Hook and 23 miles north of Little
Egg Harbor. It forms the main entrance to Barnegat Bay, the
largest of the bays on the New Jersey coast which are separated
from the ocean by narrow barrier beaches. The inlet lies between
Island Beach on the north and Long Beach on the south. (See U. S.
Coast and Geodetic Survey Chart No. 1216.)
   Existing project.-This provides for a channel 8 feet deep 'through
the inlet and 10 feet through the outer bar, the channel to be pro-
tected by two converging stone jetties extending to the outer 12-
foot contour and spaced 1,000 feet apart at the outer ends; a channel
of suitable hydraulic characteristics extending in a northwesterly
direction from the gorge in the inlet to the Oyster Creek Channel
just northwest of Sunset Shoal, thence via Oyster Creek Channel
to deep water in the bay. The mean range of tide at the inlet gorge
is 2.7 feet and in Barnegat Bay about 0.5 foot. The extreme range
of tide at the inlet i§ from 1.5 feet below mean low water to 2.6
feet above mean high water.
   The estimate of cost for new work revised in 1937, is $825,000,
exclusive of $300,000 to be contributed by local interests. The latest
(1937) approved estimate for annual cost of maintenance is $30,000.
   The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (Rivers and Harbors Committee Doc.
No. 19, 73d Cong., 2d sess.). The project was modified by the
River and Harbor Act approved August 26, 1937, to provide for a
channel of suitable hydraulic characteristics extending from the
gorge in the inlet to the Oyster Creek Channel and thence to the bay.
 (Rivers and Harbors Committee Doc. No. 85, 74th Cong., 2d Sess.).
The latest published maps are in the project documents.
   Local cooperation.-The project as authorized by the River and
Harbor Act of Aug. 26, 193'7, is subject to the condition that the
State of New Jersey or local interests shall contribute $300,000 to the
first cost of the work.
   Terminal facilities.-There are four docks or terminals located in
the inner harbor at Barnegat City which furnish adequate facilities
for the present commerce of the locality. All are private, three being
used for fishing interests and the other by Coast Guard boats.
   Operations and results during fiscal. year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project. The controlling depths at mean low water on June
340            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1983

30, 1937, were as follows: Across the outer bar, 5.0 feet; thence through
the Oyster Creek Chanel, 3.9 feet; and thence across the bar to deep,
water in Barnegat Bay, 3.2 feet. There have been no costs or
expenditures on this project.
   Proposed operations.-No funds are available, and no work is
contemplated during the fiscal year 1938.
   The sum of $825,000 together with $300,000 additional to be con-
tributed by local interests,, can be profitably expended' during the
fiscal year 1939, to be applied to new work dredging and jetty con-
struction, by contract (July 1938 to March 1939).
                                                Cost and financial summary

Cost of new work to June 30, 1937                ------------------------                          ----
Cost of maintenance to June 30, 1937.--------------------------------
Net total expenditures___________________
Total amount appropriated to June 30, 1937---------------                                             --
Amount (estimated) required to be appropriated for completion of
                      -- - - - -    - - - - - - - - - - - - - - - - - - - - - -         - - - - - -
  existing project                                                                                    $825, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 825, 000
  1In addition local interests are required to contribute $300,000.

   30. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                 (GENERAL)

  The cost of work during the year was $118,155.17. The expendi-
tures were $136,019.69. The balance unexpended June 30, 1937,.
amounting to $710.18, together with $50,000 allotted during July
1937, will be applied as needed during the fiscal year 1938 to payment
of expenses incurred under this heading.
  The additional sum of $80,000 can be profitably expended during
the fiscal year 1939.
                                                    Cost and financial summary

Cost of new work to June 30, 1937-_, ...
Cost of maintenance to June 30, 1937 ------------------                                                                $538, 812. 20

     Total cost of permanent work to June 30, 1937-------                                                         -__ 538, 812. 20
Minus accounts payable June 30, 1937--- -----------------------                                                            709. 80
     Net totalhexpenditures---------------------.--538,102.                                                                      40
Unexpended balance June 30, 1937------------------------------                                                              710. 18
          Total amount appropriated to June 30, 1937_.-------                                             ___           538, 812.58

          Fiscal year ending June 30                            1933           1934           1935              1936         1937


Cost of new work_.._
Cost of maintenance-.......................                  $56, 756. 62   $58, 578. 81   $51, 640. 66    $97, 094.61    $118, 155. 17
Total expended---............--            .--.-.        _    76, 999. 72    72, 939. 73    41, 496. 21     85, 901. 15    136, 019. 69
Allotted_.._      ----------------------
                .....                                         68, 656. 76   108, 955. 82    60, 000. 00     91,300. 00      75, 000.00


Balance unexpended July 1, 1936 -----                  ---------------------- $61, 729. 8T
Amount allotted from War Department Appropriation Act approved
  May 15, 1936     -----------------------------------------                   75, 000. 00)
         SAmount to be accounted for--------. __...                                                                     136729. 87
             RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                          341
Gross amount expended _---__,__----_--------       - $148, 395.87
Less reimbursements collected  -- __---. ---------     12, 376. 18
                                                                                                                            $136,019.69

      Balance unexpended June 30, 1937                                                                                            710. 18
Outstanding liabilities June 30, 1937-----------                                      -----------------                           709. 80
     Balance available June 30, 1937_____--------------                                                                                .38
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------.. ------------------------                                                                  50,000.00

           Balance available for fiscal year 1938__------------------                                                         50, 000. 38

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ___________--_____-------80,                                                                           000. 00
  1
      Exclusive of available funds.

31. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                         [Commercial statistics for these projects are given in pt. 2 of report]

                                                                  For last full     Cost and expenditures to                  Estimated
                     Name of project                              report, see             June 30, 1937                       amount re-
                                                                  annual re-                                                   quired to
                                                                  port for-         New work            Maintenance            complete


1. Chester River, Pa.'-------.. .........------------------....      1931            $6, 000. 00             $650. 26         $3,600.
2. Appoquinimink River, Del.............'----------------.           1931            36, 973.35            40, 998. 56        $3,000.
3. Leipsic River, Del. ------------------------                      1931            36, 956.06            32,167. 94         Completed.
4. Alloway Creek, N. J.'-----------------------    1931                               21,397. 73           33, 002. 27           Do.
5. Maurice River, N. J.2                           1935
                             .-----------------------                                143, 984. 49         108, 595.01         $107,000.
6. Toms River, N. J.'-                             1933
                            .-------------------------                                10, 050. 00          15, 007. 59        Completed.

  1 Channels adequate for commerce.
  s Awaiting local cooperation.

        32. PLANT ALLOTMENT FOR PHILADELPHIA, PA., DISTRICT

                                                Cost and financial summary
Undistributed costs June 30, 1937_1111111111 1                                                   ____                $2, 915,163. 96
Plus accounts receivable June 30, 1937---------------                                                                    269, 741. 73

      Gross total costs to June 30, 1937----------                                                          -            3, 184, 905. 69'
Minus accounts payable June 30, 1937- -        -----                                      ----             -         -      118, 219. 54
     Net total expenditures ------------------                                                                           3, 066, 686. 15
Unexpended balance June. 30, 1937                                                                                            62;229. 94
                                                                                                                            1--------------------------
          Total amount appropriated to June 30, 1937--                                     -        -      -__           3, 228, 916. 09

          Fiscal year ending June 30                      1933              1934            1935                 1936              1937


Total expended.......------------------------                        ------------ $2,940, 826.08            $44, 902.43          $80, 957.64
Allotted....        -----------------------------------                                3, 184, 422. 99      100, 000. 00        -55, 506.90


Balance unexpended July 1, 1936---- ---------------        ---                                                             $298, 694. 48
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936 ... -    ---------     __----- --------                                                               119, 224. 43
     Amount to be accounted for ...------.-----------                                                            -          417, 918. 91
Deductions on account of revocations of allotments ------                                                 ---               174, 731.33"
          Net amount to be accounted for-...                                ...-.        -_-_ ---                           243, 187. 58.
342          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended                                                 ---         $2, 770, 867. 96
Less--
    Reimbursements collected-                          $2,652, 064. 38
    Receipts from sales----------                          37, 845. 94
                                                                                      2, 689, 910. 32
                                                                                                              $80, 957. 64

      Balance unexpended June 30, 1937-__-        __________                                                  162, 229.94
Outstanding liabilities June 30, 1937 -__- --  __ $204, 449.84
Amount covered by uncompleted contracts---------    79, 079. 91
                                                                                                              283, 529. 75

     Balance available June 30, 1937 ___-                                   -. ____             -________   -121, 299. 81
Accounts receivable June 30, 1937-----------------                                                            269, 741. 73

         Unobligated balance available June 30, 1937 _______----                                              148, 441.92

Status of reports called for by river and harbor acts and committee resolution

                                                             Date trans-
        Locality              Authorization act               mitted to                 Document no.         Recomn
                                                              Congress

Abescon Inlet, N. J ____ River    and Harbor
                           Committee resolu-
                           tions, Apr. 16, 1935,
                           and Feb. 27, 1936.
Cedar Creek, N. J ... River and Harbor Act,
                           Aug. 26, 1937.
Cohansey River, N. J.__Senate Committee res- Apr. 1, 1937 Senate Committee                                   Favorable.
                           olution, June 27,                          print, 75th Cong.,
                           1935.                                      1st sess.
Delaware River, Phila- Senate Committee res-                       -- - - - - - - - - - - -
  delphia to the sea.      olution, June 12,
                           1935.
Delaware and Chesa- River and Harbor Act, Nov. 18, 1936               ._____. __ ______                      Unfavorable.
  peake Canal at Chesa-    Aug. 30, 1935.
  peake City, Md., an-
  chorage basin and
  bridge alterations.
Delaware to Chesa- River and Harbor Act,
  peake Bay, Del. and      Aug. 26, 1937.
  Md., turning basin
  in vicinity of Chesa-
  peake Cruising Club
  at Chesapeake City.
Fortescue Creek, N. J., ._._do-         -                     -------------
                                                 -I.-- .................
  to Atlantic City, N. J.,
  waterway through
  Cumberland, Cape
  May, and Atlantic
  Counties.
Indian River and Indian River and Harbor July 7, 1937 River and Harbor                                       Favorable.
  River Inlet, Del.        Committee resolu-                          Committee, 41, 75th
                         tion, Feb. 21, 1935.                                         Cong., 1st sess.
Lehigh River (flood Flood Control Com-
  control).              mittee resolution,
                         Mar. 19, 1937.
Mantua Creek, N. J..._ River and Harbor
                         Committee resolu-
                         tion, Jan. 29, 1937.
New Jersey Intracoastal River and Harbor Act,
  Waterway, from         Aug. 30, 1935.
Shrewsbury River to
Delaware Bay via
Manasquan-B arn e-
gat Canal, and includ-
ing an entrance
through Barnegat
Inlet.
New Jersey State Inland   -   _do ...-------   ..--------------..--                    -----------
Waterway to Dela-
ware Bay, waterway
across   Cape May
County, N. J.
           RIVERS AND HARBORS-;PHILADELPHIA, PA., DISTRICT                                                                   343
       Status of reports called for by river and harbor acts and committee
                              resolutions-Continued

                                                            Date trans-                               o           Rec tion
        Locality             Authorization act              mitetso                Document
                                                             Congress

Pleasantville, N. J., to     River and Harbor Act, --.---.--------------------
  Atlantic City, N. J.,        Aug. 26, 1937.
waterway      through
Lake Bay, including
connecting channel to
Ocean City.
St. Jones River, Del.....    River and Harbor Feb. 23,1937 River and Harbor Favorable.
                              Committee resolu-                       Committee, 18, 75th
                              tion, Jan. 28, 1935.                    Cong., 1st sess.
Schuylkill River, Pa ...     River and Harbor--------------------- ........................
                         Committee resolu-
                         tion, Apr. 8, 1935.
Townsend Inlet, N. J___ River and Harbor
                               Committee resolu-
                        tion, May 18, 1937.
West Creek, N. J...... River and Harbor Act, May 25, 1937                   ----------.........----------......   Unfavorable.
                               Aug. 30, 1935.




      IMPROVEMENT OF RIVERS AND HARBORS IN THE
               BALTIMORE, MD., DISTRICT

  This district includes the waterways along the Atlantic Ocean from
the Delaware-Maryland State line to Cape Charles, Va., and also
includes Chesapeake Bay and its tributaries, except the western half
of the bay and tributaries thereto south of Cove Point.
  District engineer: Col. E. J. Dent, Corps of Engineers.
   Division engineer: Col. E. I. Brown, Corps of Engineers.
                                                  IMPROVEMENTS

                                                     Page                                                                    Page
1. Baltimore Harbor and chan-                                13. Crisfield Harbor, Md -___-.                                361
      nels, Md ---------------                        344 14. Pocomoke River, Md.--.-.-                                      363
2. Susquehanna             River,      above             15. Twitch Cove and Big Thor-
         and below Havre de Grace,                               oughfare River, Md..-----                                   364
         Md       _ _--        ------                 348 16. Starlings Creek, Va _---                                       366
3.   Northeast River, Md              -----          349 17. Onancock River, Va____   .                                     367
4.   Inland waterway from Dela-                          18. Chincoteague Bay, Va___ __                                     369
         ware River to       Chesa-                       19. Ocean City Inlet and Sine-
         peake Bay, Del. and Md.                                puxent Bay, Md--          --                                 370
         (section Courthouse Point                        20. Fishing Creek, Md______ __                                     373
        to Pooles Island)_____                        350 21. Parish Creek, Md______  ..                                     374
5.   Rock Hall Harbor, Md ....                       351 22. Back Creek, Anne Arundel
6.   Island Creek, Md                                352       County, Md_                                                  375
7.   Cambridge Harbor, Md __                         353 23. Annapolis Harbor, Md -         -                               376
8.   Waterway from Little Chop-                          24. Cypress Creek, Md .........                                    378
         tank River to Choptank                           25. Examinations, surveys, and
         River, Md-----------                         354       contingencies (general) __                                   379
9.   Fishing Bay, Md _-                              355 26. Other projects for which no
10.   Nanticoke River, Md ......                      356       estimates are submitted___                                   380
11.   Wicomico River, Md-                             357 27. Plant allotment________.                                       380
12.   Upper Thoroughfare, Deals                           28. Susquehanna River Basin-
         Island, Md-------------                      359       flood control_  ________                                     381
,344     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

            1. BALTIMORE HARBOR AND CHANNELS, MD.

    Location.-Baltimore Harbor consists of the Patapsco River and

,of
its tributaries. Patapsco River: The river is formed by the junction
     the North and South Branches, both of which rise in central
Maryland. It is about 65 miles long and flows in a general south-
easterly direction. (See U. S. Coast and Geodetic Survey Chart No.
549.)
    Previous projects.-Patapsco River: The original project was
dated July 4, 1836. Modifications were contained in the River and
Harbor Acts of August 30, 1852; June 10, 1872; March 3, 1881; June
3, 1896; March 3, 1905; March 3, 1909; February 27, 1911; and March
-4,1913.
    Middle Branch: The original project was dated June 3, 1896.
    Curtis Bay: The original project was dated July 15, 1892. It was
:modified by the River and Harbor Act of June 13, 1902.
    York Spit: The original project was dated March 3, 1905.
    The cost and expenditures on original and modified projects were:
For new work, $8,764,003.40; for maintenance, $399,801.77; a total
of $9,163,805.17. For further details see pages 1787 and 1788 of the
Annual Report for 1915, and page 389 of the Annual Report for 1932.
    Existing project.-This provides for: (a) A main channel between
Cape Charles, Va., and Fort McHenry, Baltimore, Md., with dimen-
-sions as follows: 37 feet deep and 1,000 feet wide between the curves
of 37-foot depth in Chesapeake Bay opposite York Spit, a distance
of about 4 miles; 37 feet deep and a general width of 600 feet from
the 37-foot curve in Chesapeake Bay at the entrance to the Craighill
section to the west side of the main private channel to Sparrows
Point, a distance of about 121/2 miles, and thence 35 feet deep and
'600 feet wide to Fort McHenry, a distance of about 71/2 miles; (b)
for branch channels with dimensions as follows: 35 feet deep and
400 feet wide from the main channel to head of Curtis Bay, a distance
of about 21/ miles; 35 feet deep and 400 feet wide from the main
channel at Fort McHenry to Ferry Bar, and thence 27 feet deep
and 250 feet wide to the Western Maryland Railway bridge, a total
distance of about 31/s miles; (c) for widening the angle between
the Fort McHenry and Ferry Bar sections; (d) for widening at the
approaches and bends and for anchorages and turning basins, as
approximately shown on the maps accompanying Rivers and Harbors
Committee Document No. 11, Seventieth Congress; first session, and
House Document No. 29, Seventy-first Congress, first session; (e) it
is further provided that as rapidly as the city of Baltimore, at its
own expense, extends the 35-foot depth into the Northwest Branch
  (inner harbor) the United States shall take over the maintenance
of that depth. All depths refer to mean low water. The mean
 :range of tide in the upper sections of the harbor is a little more than
1 foot under ordinary conditions, with an extreme range of 12.8 feet.
In the York Spit Channel these ranges are 2.5 and 3.3 feet.
respectively.
    The estimate of cost for new work, revised in 1929, is $4,404,640,
exclusive of amounts expended on previous projects. The latest
 (1929) approved estimate for annual cost of maintenance is $187,000.
         RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT               345
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the main 35-foot
channel 600 feet wide throughout (H. Doc. No. 186, 57th Cong., 2d
.sess.); act of March 3, 1909, provided for the anchorage basin near
the intersection of the Fort McHenry and Curtis Bay Channels upon
the condition that such addition could be made within the original
limit of cost (no prior estimate or recommendation) ; act of February
27, 1911, provided for an increase of channel width at the entrances
and bends, provided such increase could be made within the limit of
the original estimate; act of March 4, 1913, provided for an increase
in width of the York Spit Channel from 600 to 1,000 feet (H. Doc.
No. 1190, 62d Cong., 3d sess.); act of August 8, 1917, provided for
additions to the then existing project and for the inclusion of all
Government river and harbor works in the Patapsco River, its tribu-
taries, and the approaches thereto into one project to be known as
 "Baltimore Harbor, Md.", and approaches thereto (H. Doc. No. 799,
44th Cong., 1st sess.); act of January 21, 1927, authorized change in
location of the anchorage near the upper end of the Fort McHenry
Channel; act of July 3, 1930, authorized increased anchorage facilities
 (River and Harbor Committee Doc. No. 11, 70th Cong., 1st sess.);
increased depth from 35 to 37 feet in that portion of the channel
leadingto Baltimore lying between the 37-foot curve near Baltimore
Light to the Sparrows Point entrance channel; similar increased
depth in York Spit section; widening the angle between Fort
McHenry and Ferry Bar sections; and increased width from 250 to
400 feet in the Curtis Bay section (H. Doc. No. 29, 71st Cong., 1st
sess.). The two last-mentioned documents contain the latest pub-
lished maps.
   Local cooperation.--The River and Harbor Act of August 8, 1917,
required that on all new work under the project approved by that
act, except the channel into Curtis Bay, improvement by the United
States is made conditional upon local interests providing, whenever
required by the Chief of Engineers, free of cost to the United States,
usuitable areas behind bulkheads or other revetment, satisfactory to
the district engineer, in which the dredged material may be deposited.
In compliance with this requirement the city of Baltimore provided
:space behind a bulkhead at McComas Street on which 782,998 cubio
yards, from the Ferry Bar section, were deposited.
   The River and Harbor Act of July 3, 1930, provided for increased
anchorage facilities, subjebt to the provisions that no. work shall be
:started on the area therein recommended until local interests have
provided suitable disposal areas satisfactory to the district engineer
alongside of bulkheads behind which said interests will agree to
pump the material without delay to the Government work; or, in lieu
of the above requirement, agree to contribute the sum of 5 cents per
cubic yard, scow measure, to cover the additional cost to the United
States for disposal of the material on its own dumping area.
   The city is constructing an airport, which involves a fill behind
bulkheads of more than 10,000,000 cubic yards of material. Material
removed from the anchorage areas, provided for in the River and
346     REPORT OF CHIEF OF ENGINEERS;' U.C S        ARMY, T937

Harbor Act of July 3, 1930; and deposited in a rehandling basin
alongside the airport was deposited by the city on the airport site.
   Terminal facilities.-The total length of developed water front in
Baltimore Harbor, measured along the. established- bilkhead line, is
about; 27 miles. Extensive areas remain which are available for
further development. The existing terminal facilities include
wharves, piers, grain elevators, coal and ore piers, storage and bunk-
ering facilities for fuel oil, terminal warehouses, marine railways,
drydocks, and shipyards.
   The State legislature has authorized the city of Baltimore to incur
an indebtedness of $50,000;0000 for the development of the port. The
Port Development Commission, which is charged with administration
under this authorization, has completed an $8,500,000 terminal pier at
Port Covington. For further details, see page 391, Annual Report
for 1932.
   Operations and results during fiscal year.-No dredging was done.
Expenditures were for surveys for further maintenance of various
sections of the channel, and supervision of private dredging work.
The total costs were $2,604.35 all for maintenance. The total ex-
penditures were $2,903.48.
   Condition at end of fiscal year.-The existing project is about 73
percent completed. The approach channel opposite York Spit has
been dredged to a depth of 37 feet at mean low water for a center
width of 900 feet and 34.9 feet at mean low water for a width of
1,000 feet; the branch channel into Curtis Bay and the Ferry Bar
section as far as the entrance channel to Port Covington have both
been dredged to ,full project width, 400 feet, and depth, 35 feet at
mean low water.
   The work remaining to be done includes completion of the York
Spit section, Ferry Bar section from Port Covington entrance chan-
nel to Ferry Bar, and the Spring Garden section. including turning
basin from Ferry Bar to Western Maryland Railroad bridge.
   The controlling depths are 35.3 feet along the center, 33.5 feet along
the easterly edge and 34.5 along the westerly edge in York Spit
section, ascertained in January 1937; 38 feet in Craighill entrance,
ascertained in March 1932; Craighill section 37 feet ascertained in
September 1935; Craighill Cutoff angle, 37 feet, ascertained in Sep-
tember 1935; cutoff section 37 feet along center line 35 feet along
the sides, ascertained in September 1935; Cutoff-Brewerton angle,
37 feet, ascertained in September 1935; Brewerton section to entrance
to Sparrows Point, 37 feet, ascertained in August 1935; and for the
remainder of the section to Brewerton-Fort McHenry angle, 35 feet,
ascertained in August 1935: Brewerton-Fort McHenry angle, 35
feet, ascertained in March 1936; Fort McHenry section 33.3 feet ascer-
tained in September 1935; Curtis Bay section 33.6 feet ascertained in
October 1935; Ferry Bar section, from its intersection with the Fort
McHenry section to the private channel leading to the Western Mary-
land Railway piers. 31.9 feet, ascertained in October 1935, and thence
29 feet to Ferry Bar, ascertained in November 1923, and 27 feet from
Ferry Bar to the Hanover Street Bridge, ascertained in December
              RIVERS AND HARBORS-BALTIMORE, - MD ,, DISTRICT                                                      347
1923,:thence 27. feet in the old Southwest Baltimore Harbor Channel,
above Hanover Street Bridge, ascertained in January 1928; Quaran-
tine anchorage 33.4 feet, ascertained in August 1935; Fort McHenry
anchorage 32.4 feet, ascertained in September 1935; and Riverview
anchorage 33.1 feet, ascertained in-September 1935. Total costs were
$6,698,346.03 of which $3,215,237.50 was for new work and $3,483,-
108.53 for maintenance. The total expenditures were $6,698,316.03.
   Proposed operations.---The unexpended balance July 1, 1937. to-
gether with $50,000 allotted during July, plus an additional allotment
of $125,000 to be made later, will be applied to maintenance dredging
with a United States hopper dredge, December 1937 to June 1938.
   The additional sum of $187,000 can be profitably expended during
the fiscal year 1939, in maintenance dredging where needed by
Government plant in various sections of the main channel.
                                      Cost and financial summary

Cost of new work to June 30, 1937-----------------------$11,    979, 240. 90.,
Cost of maintenance to June 30, 1937-___----- ----------     3, 882, 910. 30
        Total cost of permanent work to June 30, 1937--- -----                                       15, 862, 151.20

Net total expenditures----------------------- --------------- 15, 862, 151. 2)
Unexpended balance June 30, 1937-------------------    --------     3, 414. 29
        Total amount appropriated to June 30. 1937-----------15,                                        865, 565. 49


    Fiscal year ending June 30             1933            1934              1935              1936             1937

Cost of new work-...._.._......_        $490, 297. 93   $127, 531.96 -.----------.---------------.
Cost of maintenance_____------------ --------------       55, 474. 72     $244, 505. 44     $215, 815. 73      $2, 604. 35
      Total cost-------------.   --      490, 297. 93    183, 006. 68      244, 505. 44      215, 815. 73       2, 604. 35
Total expended.------------------475, 192. 28            181, 421. 08      140, 849. 49      263, 079. 44       2, 903. 48
Allotted....-----------------------      741, 182. 64    193, 707. 55       15, 723. 18      283, 000. 00   -200, 000. 00


Balance unexpended July 1, 1936 ---... ____.__-.._____-__                                              $206, 317. 77
Deductions on account of revocation of allotment --------------                                         200, 000. 00
      Net amount to be accounted for                       __     __                                         6, 317. 77
Gross amount expended_ -     ---___- -                      -________--- $3, 317. 97
Less reimbursements collected ---------                         -     -_____ 414. 49
                                                                                                             2, 903. 48
     Balance unexpended June 30, 1937       __--   _______                                                   3, 414. 29
Amount allotted from War Department Civil Appropriations
Act approved July 19, 1937------------- -------------------                                                50, 000. 00
         Balance available for fiscal year 1938----- ----                           __---                   53, 414. 29
Amount (estimated) required to be appropriated for completion
                             -   - --- --- ------ --- ----- ---- ----- -- -
of existing project 1-----                                                                           1, 189, 400. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance1 __- __- - - - _____    - -- - -
                                                                 ______-
                                                                                                        187, 000.00
1 Exclusive of available funds.
348     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

2. SUSQUEHANNA    RIVER ABOVE AND BELOW HAVRE DE GRACE, MD..

   Location.-The river rises in the southern part of New York, and
flowing in a general southerly direction for over 400 miles, empties
into the head of Chesapeake Bay. (See U. S. Coast and Geodetic
Survey Chart No. 1226.)
   Previous project.-The original project was dated August 30, 1852.
The cost and expenditures on this project prior to the existing proj-
ect were $97,390. For further details see page 1788 of Annual Report
for 1915.
   Existing project.-This provides for a channel 200 feet wide and
15 feet deep at mean low water from Chesapeake Bay to Havre de
Grace, and for the removal of the shoal opposite Watsons Island
 (which is above Havre de Grace) to a depth of 8 feet at mean low
water and the maintenance of the existing small-boat harbor below
Concord Point at its existing length of 400 feet, width of 380 feet,
and depth of 7 feet, with approach channel of the same depth and
75 feet width leading thence to deep water off Concord Point. The
mean range of tide is 2.1 feet and the extreme tidal range is 3.8 feet
under ordinary conditions.
   The estimate of cost for new work revised in 1911 was $200,750
exclusive of amounts expended under the previous project. The
latest (1937) approved estimate for annual cost of maintenance is
$5,000. The existing project was adopted by the River and Harbor
Act of August 2, 1882, and modified by the River and Harbor Act
of August 26, 1937, to provide for maintenance of the small boat har-
bor and for the approach channel thereto (H. Doc. No. 322, 75th
Cong. 1st sess.). The latest published map is in the last-mentioned
document.
   Local cooperation.-Local interests are required to furnish free of
cost to the United States suitable disposal areas for the maintenance
of the small boat harbor and approach channel thereto.
   Terminal facilities.-There are nine bulkhead wharves and two
open pile timber piers served by this improvement, all privately
owned, aggregating a frontage of approximately 4,000 feet. Six of
these are open to general public use. These are considered adequate
for existing commerce. Two of the wharves at Havre de Grace are
in a dilapidated condition and are seldom used. A concrete bulkhead
about 500 feet long has been constructed in the small boat harbor
at Havre de Grace from which mooring stalls are being erected.
   Operations and results during fiscal year.-Dredging by contract
for restoration of the project adopted by the River and Harbor Act
of August 2, 1882, was commenced August 4, 1936 and completed
September 25, 1936. A total of 97,854 cubic yards of material was
removed. The total costs, all for maintenance, were $25,032.39. The
total expenditures were $25,032.39. The Works Progress Adminis-
tration in conjunction with the City of Havre de Grace commenced
dredging on November 2, 1936, in the small boat harbor and ap-
proach channel thereto and completed the work on March 15, 1937.
A total of 98,410 cubic yards of material was removed. Work by the
             RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                                                        349
Works Progress Administration was in progress at the end of the
year under a supplemental agreement to lengthen the existing small'
boat harbor. The lengthening of the existing boat harbor is outside-
the limits of the existing project. The total cost for new work on the
boat harbor was $20,859.35. The total expenditures were $16,488.12.
   Condition at end of fiscal year:-The project adopted by the River
and Harbor Act of August 2, 1882, was restored in September, 1936..
The controlling depth in the main section of the river is 15 feet at
mean low water ascertained in September 1936, and 7 feet at mean
low water in the small boat harbor and approach channel thereto,
ascertained in March 1937. The total costs of the existing project
have been $173,274.40 for new work and $69,287.99 for maintenance,
a total of $242,562.39. The total expenditures were $242,562.39. In
addition to the above, the Works Progress Administration expended
$16,488.12 in dredging the small boat harbor and channel leading
thereto, which is now included in this project.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939 on the existing project.
The unexpended balance, July 1, 1937, of Works Progress Adminis-
tration funds, $6,001.88 will be applied to completion of the small-
boat harbor by contract.
                                         Cost and financial summary

Cost of new work to June 30, 1937--                             ----------------------                 $270, 664.40
Cost of maintenance to June 30, 1937                                                                      9, 287. 99
                                                                                                         6-------------------------
      Total cost of permanent work to June 30, 1937                             -------------           339, 952.39
Net total expenditures    ------------ ----------------- -----                                          339, 952. 39
Total amount appropriated to June 30, 1937-------------------                                           339, 952. 39

        Fiscal   year   ending   June   30               1933          1934         1935        1936           1937



Cost of new work............--....---------..............                                     ..........
Cost of maintenance-----------------------                                 ------------
                                                                  -----------              -------------     $25,032. 39
Total expended..----        ....-.-.-   ..--------------- -     - --   -----      .--     -----------
                                                                                  .----------                 25,032.39
Allotted...............-----------------------------------------------------                 $30,000.00      -4,967.61


Balance unexpended July 1, 1936---------------------------                                              $30, 000. 00
Deductions on account of revocation of allotment----------------                                          4, 967. 61
      Net amount to be accounted for-------------------------                                              25, 032. 39
Gross amount expended---------------------------------------                                               25, 032. 39
   SIn addition, $16,488.12             expended by Works Progress Administration.

                                        3. NORTHEAST              RIVER, MD.

   Location.-The river is a tidal waterway extending southwestward
5.5 miles from the junction of its branches in the town of North
East to the head of Chesapeake Bay, 6 miles north of the entrance
to the Chesapeake & Delaware Canal. (See U. S. Coast and Geodetic
Survey Chart No. 1226.)
350     REPORT OF.,CHIEF, OF ENGINEERS,.         :U. S. ARMY, 1937

   Previous projects.-In 1872 and, 1880 appropriations aggregating
$15,500 were made for dredging a channel '6 feet deep. A project
for improvement was adopted by the River and Harbor Act of Sep-
tember 19, 1890. The total costs and expenditures were $20,640 for
new work. For further details see page 135 of Annual Report for
1893.
   SExisting project.-This provides for a channel 60 feet wide and
7 feet deep from that depth in the river to the foot of Church Street
in the town of North East, enlarged at its upper end to form a
basin 120 feet wide and 300 feet long. The plane of reference is
mean low water. The mean range of tide is 2.25 feet.
   The estimate of cost of new work made in 1937 is $7,300, exclusive
of amounts expended on previous projects. The latest (1937) ap-
proved estimate of cost for annual maintenance is $1,000. The exist-
ing project was adopted by the River and Harbor Act of August
26, 1937 (H. Doc. No. 248, 75th Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-Local interests are required to furnish free
of cost to the United States necessary rights-of-way and suitable
spoil-disposal areas for new work and for subsequent maintenance
as required.
   Terminal facilities.-There are a few lightly constructed landings
for small boats scattered along the water front of North East.
There is a fish-pickling plant with a timber wharf at the south edge
of the town.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project and condition is as described in the project docu-
ment.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
   The sum of $7,300 can be profitably expended during the fiscal
year 1939 in completion of project by contract dredging.
                        Cost and financial summary
Cost of new work to June 30, 1937__-_________-_                         $20, 640
Cost of maintenance to June 30, 1937

      Net total expenditures- --------           -____          -__      20,640
                                                                      _-------
Total amount appropriated to June 30, 1937___   _    ___-----            20, 640

Amount (estimated) required to be appropriated for completion of
existing project--------------------------------------------             7, 300
Amount that can be profitably expended in the fiscal year ending June
30, 1939, for new work--------------------------------------             7, 300

4. INLAND WATERWAY FROM DELAWARE RIVER                      TO CHESAPEAKE
                   BAY,, DEL. AND MD.

  (Section: Courthouse Point to Pooles Island.)
  For report on this improvement see page 295.
        RIVERS AND HARBORS-BALTIMORE,           MD., DISTRICT       351
                       5. ROCK HALL HARBOR, MD.

   Location.-Rock Hall Harbor is a shallow, open cove on the east
side of Chesapeake Bay immediately to the south of Swan Point and
23 miles southeast of Baltimore. (See U. S. Coast and Geodetic
Survey Charts Nos. 548 and 1226.)
   Previous projects.-The original project was dated June 3, 1896.
Modifications were made by the River and Harbor Acts of June 13,
1902, and March 4, 1913. The costs and expenditures on the original
and modified projects were $87,756.73 for new work and $9,762.04 for
maintenance, a total of $97,518.77. For further details see page 493
of the Annual Report for 1920.
   Existing project.-This provides for a channel 60 feet wide and
7 feet deep from that depth in Swan Point Inlet to a channel of the
same dimensions, 700 feet in length parallel to the harbor terminals
at Rock Hall; an anchorage basin of the same depth 100 feet wide
and about 800 feet long in northwesterly extension of the channel
fronting the harbor terminals; and twin breakwaters at the harbor
entrance. The plane of reference is mean low water. Mean range
of tide is about 1.1 feet. Greater fluctuations are caused by high
winds.
   The estimate of cost of new work made in 1937 is $58,000, exclusive
of amounts expended on previous projects. The latest (1937) ap-
proved estimate of cost for annual maintenance is $1,500. The exist-
ing project was adopted by the River and Harbor Act of August
26, 1937 (H. Doc. No. 204, 75th Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-Local interests are required to furnish, free of
cost to the United States, all lands needed for the improvement, con-
struct a bulkhead 500 feet long on the north edge of the basin, ac-
quire and reserve for public use an area 100 feet beyond the bulk-
head and provide a highway connection thereto. It is provided fur-
ther that the part of the basin landward of the low water line at the
west end will not be constructed if local interests are unable to secure
the land needed therefor.
   Terminal facilities.-There are two private wharves, a county
wharf and a small marine railway at the head of the harbor. Present
facilities are adequate for existing and reasonably prospective
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing project and the condition is as described in the project
document.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.




     20196-37-pt. 1-   23
352      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The sum of $58,000 can be profitably expended during the fiscal
year 1939, as follows:
New work:
   Dredging by contract       ------------------------------       $13, 050. 00
   Stone jetty construction by contract ___-----____-__-__          44, 950. 00

       Total----                 ----------------            ---    58, 000. 00
                        Cost and financial summary

                                ------------
Cost of new work to June 30, 1937                   __-________ $87, 756. 73
Cost of maintenance to June 30, 1937-------------------------     9, 762. 04

      Net total expenditures    --------------------------------    97, 518. 77
Total amount appropriated to June 30, 1937------ --------------     97, 518. 77
Amount (estimated) required to be appropriated for completion of
existing project      ----------------------------------------     58, 000. 00
Amount that can be profitably expended in the fiscal year ending
June 30, 1939, for new work_______________                         58, C000. 00
                         6. ISLAND CREEK, MD.

   Location.-The creek is a tidal estuary with numerous tributaries
and enters the Choptank River about 2 miles south of the town of
Oxford, Md. (See U. S. Coast and Geodetic Survey Chart No.
1225.)
   Existing project.-This provides for a channel 8 feet deep and
75 feet wide, at mean low water, through the entrance bar. The
mean range of tide is about 2 feet.
   The estimate of cost of new work, made in 1936, is $6,800. The
latest (1936) approved estimate of cost for annual maintenance is
$500.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 75, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Localinterests are required to furnish free of
cost to the United States suitable spoil disposal areas for new work
and subsequent maintenance.
   Terminal facilities.-There are several substantial pleasure boat
wharves along the shores of the creek. Minor and relatively inex-
pensive alterations to these wharves would produce adequate facili-
ties for the handling of farm produce. Sufficient areas are available
for the construction of additional terminals if and when needed.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done and the
condition is as described in the project document.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
   The sum of $6,800 can be profitably expended during the fiscal
year 1939 in completion of project by contract dredging.
         RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                     353
                         Cost and financial summary
Cost of new work to June 30, 1937----    ------------------------      ------
Cost of maintenance to June 30, 1937--------------------------------   ------

      Net total expenditures------------  ---------------------        ------
Total amount appropriated to June 30, 1937------------------------     ------

Amount (estimated) required to be appropriated for completion of ex-
isting project---------------         ----------------------------- $6, 800
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work---------------------------- ------------------- , 800

                      7. CAMBRIDGE     HARBOR, MD.

   Location.-This harbor is a tidal estuary on the south side of
Choptank River about 18 miles above its mouth. It is approxi-
mately 70 miles southeast of Baltimore Harbor. (See U. S. Coast
and Geodetic Survey Chart No. 1225.)
   Previous projects.-The original project was adopted by the River
and Harbor Act approved March 3, 1871, and was modified by the
acts of August 11, 1888, and June 13, 1902. The costs and expendi-
tures on previous projects prior to the adoption of the existing proj-
ect were $61,321.13 for new work and $6,987.30 for maintenance, a
total of $68,308.43. For further details of previous projects see page
1789 of Annual Report for 1915 and page 424 of Annual Report for
1924.
   Existing project.-This provides for a channel 14 feet deep from
that depth in Choptank River to the head of the harbor with widths
of 150 feet below the Market Street Bridge in Cambridge and 100
feet above, and a turning basin of the same depth at the head of
the channel; for an anchorage basin 10 feet deep, 400 feet long
and 175 feet wide on the west side of the channel and a second basin
of the same depth 225 feet long and 200 feet wide on the east side
of the channel; and a channel 60 feet wide and 7 feet deep from
that depth in Choptank River to the municipal boat basin north
of the entrance to the harbor. The plane of reference is mean low
water. The mean range of tide is about 1.7 feet and the extreme
tidal range is 3.5 feet in ordinary conditions.
   The estimated cost for new work, revised in 1937, is $54,000, exclu-
sive of amounts expended on previous projects. The latest (1937)
approved estimate of cost for annual maintenance is $1,400.
   The existing project was adopted by the River and Harbor Act of
March 3, 1925, and provided for a channel 12 feet deep and 150 feet
wide to the drawbridge and 10 feet deep and 100 feet wide from
the bridge to the upper end of the harbor with a turning basin at
that point (H. Doc. No. 210, 68th Cong., 1st sess.) and modified
by the River and Harbor Act of August 26, 1937 to provide for the
present project dimensions (Rivers and Harbors Committee Doc. No.
7, 75th Cong., 1st sess.). The latest published maps are in the
project documents.
354       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Local cooperation.-The River and Harbor Act approved August
26, 1937, provides that local interests are to furnish free of cost to
the United States suitable disposal areas for new work and subse-
quent maintenance. All prior requirements have been fully complied
with.
   Terminal facilities.-The waterfront of Cambridge is generally
built up of solid bulkhead wharves and pile and timber piers, only
a few of which have mechanical freight handling facilities. There
are two marine railways with boat repair shops. The facilities are
generally adequate for existing commerce.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project prior to the
last modification was completed in 1929. No work has been done
under the modified project. The total costs and expenditures of the
existing project have been $20,276.43, all for new work.
  Proposed operation.-No funds are available and no work is pro-
posed during the fiscal year 1938.
  The sum of $34,000 can be profitably expended during the fiscal
year 1939, in completion of project by contract dredging.
                           Cost and financial summary
Cost of new work to June 30, 1937-------------------------------$81, 597. 56
Cost of maintenance to June 30, 1937---------                          6, 987. 30

      Total----------------- --        ----------------------------   88, 584. 86
Net total expenditures___ _------                                     88, 584. 86
Totfalamount appropriated to June 30, 1937------------------------88, 584. 86

Amount (estimated) required to be appropriated for completion of
existing project--                                                       000. 00
                                                                      3------------------------------
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work_----------------------------------------      34, 000. 00

  8. WATERWAY FROM LITTLE CHOPTANK RIVER TO CHOPTANK
                       RIVER, MD.

  Location.-Choptank River is an easterly arm of Chesapeake Bay
about .50 miles south of Baltimore. It extends generally east and
north 70 miles. Little Choptank River enters the bay 6 miles to the
southward and extends northeastward 10 miles. (See U. S. Coast
and Geodetic Survey Chart No. 1225.)
  Existing project.-This provides for a channel 60 feet wide and
6 feet deep at mean low water from Little Choptank River through
Carey Creek, a land cut, and Lecompte Creek and Bay to Choptank
River. The mean range of tide is about 1.7 feet in Choptank River
and about 1.5 feet in Little Choptank River.
   The estimate of cost of new work made in 1936 is $59,000. The
latest (1936) approved estimate of cost for annual maintenance is
$1,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 91, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Local interests are required to furnish free of
cost to the United States, necessary rights-of-way and spoil-disposal
         RIVERS AND HARBORS-BALTIMORE,               MD., DISTRICT        355
areas for new work and for subsequent maintenance as required, and
agree to save the United States and its contractors free of claims for
damage to oyster beds because of the execution of the improvement,
and agree to provide and maintain a suitable drawbridge across the
land cut.
   Terminal facilities.-There are one or two pleasure-boat wharves
on Lecompte Creek and a number of small commercial wharves on
the various navigable tributaries of the Little Choptank River.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done and the
condition is as described in the project document.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
  .The sum of $59,000 can be profitably expended during the fiscal
year 1939 in completion of project by contract dredging.
                         Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937__                                 -------
      Net total expenditures
Total amount appropriated to June 30, 1937__________________________-------

Amount (estimated) required to be appropriated for completion of ex-
isting project-------------    ---------------------                 $59,000
Amount that can be profitably expended in fiscal year ending June 39,
1939, for new work--------------------------------------              59, 000

                           9. FISHING BAY, MD.

   Location.-McCreadys Creek, Goose Creek, and Farm Creek are
small tidal estuaries of Fishing Bay, a large estuary at the head of
Tangier Sound. Fishing Bay is connected by Hooper Strait with
Chesapeake Bay to the west about 15 miles above the mouth of Po-
tomac River. McCreadys Creek enters the east side of the bay about
6 miles above the mouth. Goose Creek enters the bay about 31/2 miles
above the mouth. Farm Creek enters Fishing Bay about 6 miles
above the mouth and approximately opposite the mouth of McCreadys
Creek. (See U. S. Coast and Geodetic Survey Chart No. 1224.)
   Existing project.-This provides for channels 6 feet deep and gen-
erally 60 feet wide at mean low water, suitably widened where neces-
sary to offer adequate sheltered anchorage space from deep water in
Fishing Bay to the vicinity of the county or packing-house wharves
in McCreadys Creek, Farm Creek, and Goose Creek. The mean range
of tide is about 2 feet.
   The estimate of cost of new work made in 1937 is $38,600. The latest
 (1937) approved estimate of cost for annual maintenance is $5,500.
   The existing project was adopted by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 186, 75th Cong., 1st sess.). The
latest published map is in the project document.
   Terminal facilities.-A public wharf built with the aid of Federal
funds is located on McCreadys Creek about 200 feet above the mouth.
There is a privately owned pile-and-timber pier about 1,500 feet above
356        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the mouth of Goose Creek.. There are two privately owned wharves
on Farm Creek. There is also a public wharf owned by Dorchester
County. The private wharves on each of the waterways are opened
to the public for transaction of business with the owners.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done and the
condition is as described in the project document.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
  The sum of $38,600 can be profitably expended during the fiscal
year 1939 in completion of the project by contract dredging.
                           Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937___

      Net total expenditures
Total amount appropriated to June 30, 1937

Amount     (estimated) required to be appropriated for completion of ex-
isting    project-------         ---------------------------------       $38, 600
Amount     that can be profitably expended in fiscal year ending June 30,
1939,    for new work----------------------------------------             38, 600

                         10. NANTICOKE RIVER, MD.

   Location.-The Nanticoke River flows in a southwesterly direction
to Tangier Sound, Chesapeake Bay, and is about 50 miles long.
The town of Nanticoke is on the east side of the river just north of
Roaring Point, about 3 miles above the mouth of the river. (See
U. S. Coast and Geodetic Survey Chart No. 567.)
   Existing project.-This provides for the construction of a small
boat harbor 7 feet deep, 120 feet wide, and 400 feet long in the
marsh at Nanticoke, with an entrance channel of the same depth and
60 feet wide, protected on either side by stone jetties in the river.
The mean range of tide is about 2.6 feet.
   The estimate of cost of new work made in 1937 is $82,000. The
latest (1937) approved estimate of cost for annual maintenance is
$1,500.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 242, 75th Cong., 1st sess.). The lat-
est published map is in the project document.
   Local cooperation.-The River and Harbor Act of August 26,
1937, provides that local interests furnish, free of cost to the United
States, necessary rights-of-way and suitable spoil-disposal areas for
new work and for subsequent maintenance as required, and guar-
antee the United States and its contractors against claims for dam-
ages to oyster beds attributable to the work of improvement or to
subsequent maintenance; and provides further that a suitable public
agency acquire and reserve title to a strip of land at least 50 feet
wide abutting the required right-of-way on the north and east sides,
and provide a suitable public-highway approach thereto.
   Terminal facilities.-There are a few sea-food packing houses
with makeshift docks along the east shore of the Nanticoke River
in the vicinity of Nanticoke. None of these is at the site of the
project.
          RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                               357
  Operation and results during fiscal year.-None.
  Condition at the end of fiscal year.-No work has been done and
the condition is as described in the project document.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
  The sum of $82,000 can be profitably expended during the fiscal
year 1939 as follows:
New work:
   Dredging by contract------------------ ---------------------- $33, 210
   Stone-jetty construction by contract --------------------------- 48, 790

      Total_____________--------------------   -------------------------------    82, 000

                                   Cost and financial summary
Cost of new work to June 30, 1937-----------------------------     -------
Cost of maintenance to June 30, 1937-------------------------  ----------
      Net total expenditures____________
Total amount appropriated to June 30, 1937-
                                                                                 -------
Amount (estimated) required to be appropriated for completion of
existing project___----  ____-----------------                  -    $82, 000
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work---------------------- ---------------------        82,000
                                 11. WICOMICO RIVER, MD.

   Location.--This river has its source in the northern part of
Wicomico County, Md., and flows in a generally southwardly direc-
tion, emptying into Monie Bay, a tributary of Tangier Sound. (See
U. S. Coast and Geodetic Survey Charts Nos. 77 and 567.)
   Previous projects.-Adopted by River and Harbor Act of June 10,
1872. The cost and expenditures were $50,000. For further details
see page 1789 of Annual Report for 1915.
   Existing project.-This provides for a channel 14 feet deep and
150 feet wide from Chesapeake Bay to Salisbury; a depth of 14
feet in the channels and turning basins in the North and South
Prongs with channel widths of 100 feet and a basin 6 feet deep, 100
feet wide, and 400 feet long at Webster Cove with a channel of the
same depth and 60 feet wide, extending to the 6-foot contour in
Wicomico River. The plane of reference is mean low water. Mean
range of tide is about 3 feet and the extreme tidal range is 4.4 feet
under ordinary conditions.
   The estimate of cost of new work, revised in 1937, is $356,300,
exclusive of amount expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $6,000.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890 (H. Doc. No. 20, 51st
Cong., 1st sess.), provided for a channel 9 feet deep from Main
Street Bridge to about 2 miles below; act of June 25, 1910, provided
for an extension of the 9-foot depth into the North Prong from
Main Street drawbridge to Salisbury, Md., dam and turning basin
 (H. Doc. No. 569, 61st Cong., 2d sess.); act of March 2, 1919 (H.
Doc. No. 1509, 63d Cong., 3d sess.), extended the project for 9 feet
depth into the South Prong to the head of navigation at Cathell
Street, Salisbury, including a turning basin and extended the project
358     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

down to the mouth of the river in Monie Bay; the act of July 3, 1930,
provided for the 12-foot channel and the act of August 26, 1937 (Sen-
ate Committee Print, 75th Cong., 1st sess.), provided for the 14-foot
channel 150 feet wide; depths of 14 feet in the North and South
Prongs; and a basin 6 feet deep at Webster Cove, and approach
channel thereto of the same depth. The latest published map is in
Senate Commerce Committee Document, Seventy-fifth Congress,
first session.
    Local cooperation.-The act of August 26, 1937, provides that local
interests are to furnish free of cost to the United States necessary
rights-of-way and suitable spoil-disposal areas for new work and for
subsequent maintenance as required, release the United States and its
agents from all claims for damages incidental to the work of im-
provement and contribute in cash an amount equivalent to the added
cost of dredging by other than hydraulic means as determined in
advance by the Chief of Engineers, where dredging by a more
costly method is deemed necessary by local interests to reduce dam-
ages to oyster beds. It is provided further that the improvement of
the channel and basin at Webster Cove shall not be undertaken until
local interests have furnished a right-of-way at least 160 feet wide
for the improvement and have acquired and reserved for public use
a strip of land at least 50 feet wide abutting the right-of-way fur-
nished the United States on the southwest side thereof with a
suitable highway approach thereto. All requirements of prior acts
have been fully complied with.
    Terminal facilities.-The present water front at Salisbury consists
of pile-and-timber bulkheads with earth fills. Some of the wharves
have warehouses and factories with mechanical freight-handling
facilities and rail sidings. With exception of a wharf on the North
Prong owned by the State Roads Commission, and a wharf on the
South Prong, owned by the county, all of the terminals are privately
owned. A shipyard, with two marine railways with capacities of
1,200 and 500 tons, respectively, is located on the right bank of the
river below the prongs. Areas for the development of new termi-
nals on the North and South Prongs are limited. Areas for a con-
siderable expansion of terminal facilities are available on the main
river. A public wharf on the main river at Salisbury is desirable
but not essential.
    The Victor Lynn Transportation Co. owns a pile-and-timber
wharf which is situated about 4 miles above the mouth of the river
at Mount Vernon. The same company owns a wharf of similar
construction at White Haven.
    Operations and results during fscal year.-Numerous logs, snags,
and other debris were removed by hired labor and plant from the
project channel in the sections from Salisbury to Fruitland wharf,
including both the North and South Prongs. The total costs, all for
maintenance, were $831.07. The total expenditures were $564.07.
    Condition at end of fiscal year.-The existing project, prior to
modification by the River and Harbor Act of August 26, 1937, was
completed in 1931. No work has been done on the modified project.
The controlling depth at mean low water in the main river is 12 feet
and in the North and South Prongs 9 feet, ascertained in August
1935. The condition in the channel and basin at Webster Cove is as
described in the Senate Commerce Committee Document. The costs
               RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                                                          359
have been $140,748.04 for new work and $86,572.15 for maintenance,
a total of $227,320.19. The total expenditures were $227,053.19.
  Proposed operations.-The unexpended balance July 1, 1937,
($435.93) will be applied to the payment of outstanding liabilities.
  The sum of $215,000 can be profitably expended during the fiscal
year 1939 in completion of project by contract dredging.
                                      Cost and financial summary
Cost of new work to June 30, 193~----------------------------                                           $190, 748. 04
Cost of maintenance to June 30, 1937___------------------                                                 86, 572. 15

      Total cost of permanent work to June 30, 1937                                ------------          277, 320. 19
Minus accounts payable June 30, 1937__---  ___---------                                                       267. 00

     Net total expenditures-----------------------                                    ------      --     277, 053. 19
Unexpended balance June 30, 1937_---__----        _                                                           4---------------
                                                                                                          -435.93

           Total amount appropriated to June 30, 1937________________                                    277, 489. 12

           Fiscal year ending June 30                 1933              1934        1935         1936             1937


Cost of new work.
Cost of maintenance     ____________-----.         --------         -_----        $8,374.54    $8,325.46           $831. 7
Total expended-$3_____________________       ___             -___ _1,                778. 22   14,921. 78           564.07
Allotted        -----------------------------        $333.53            $14,200    2,500.00 ------------          1000. 00


Amount alloted from War Department Appropriation Act approved
  May 15, 1936-------------- ----------------------------------                                             $1,       . 00
Gross amount expended------------------------------------------                                                   564. 07
      Balance unexpended June 30, 1937___ _____________--435.93
Outstanding liabilities June 30, 1937_ -_______ ---   ______-__                                                   435. 93
Amount (estimated) required to be appropriated for completion of
                  ----------------------------
existing project______                                           215,000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work---------------------------------------    215, 000.00
                  12. UPPER THOROUGHFARE, DEALS ISLAND, MD.

  Location.-This is a natural waterway lying between Deals Island
and the mainland of Somerset County, Md., on the Eastern Shore of
Chesapeake Bay. (See U. S. Coast and Geodetic Survey Chart No.
1224.)
  Previous projects.-An appropriation of $5,000 was made in 1882
for the construction of a harbor of refuge at the entrance to Upper
Thoroughfare, but, as the amount was insufficient, no useful work was
performed, the work done being limited to surveys at a cost of
$330.09.
  Existinq project.-This provides for an entrance channel from
Tangier Sound 9 feet deep and 100 feet wide, thence of irregular
width to and along the south shore of the thoroughfare, protected
by breakwaters at the entrance, with a turning basin at the inner
end 9 feet deep on the south side of the channel to within 50 feet of
the bulkhead along the south shore, an anchorage area 6 feet deep
and 150 feet wide extending across the waterway parallel to the
highway bridge to within 50 feet of the bulkhead on the south
shore and an anchorage area 650 feet lollg, 300 feet wide, and 9 feet
360     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

deep on the north side of the channel between the breakwater and
the 6-foot anchorage. The mean range of tide is about 2 feet.
   The estimate of cost of new work, revised in 1937, is $73,000, ex-
clusive of amounts expended on previous projects. The latest (1937)
approved estimate of cost for annual maintenance is $3,000. The
existing project was authorized by the Public Works Administra-
tion September 16, 1933, and by the River and Harbor Act approved
August 30, 1935, and provided for an entrance channel 9 feet deep
and 75 feet wide, protected by breakwaters, with a turning basin at
the inner end, and an anchorage area 6 feet deep and 150 feet wide
extending across the waterway parallel to the highway bridge.
 (Rivers and Harbors Committee Doc. No. 37, 72d Cong., 1st sess.);
and modified by the River and Harbor Act of August 26, 1937 (H.
Doc. No. 76, 75th Cong., 1st sess.), to provide for the present project
dimensions. The latest published map is in the last-named project
document.
   Local cooperation.-Local interests are required by the River and
Harbor Act of August 30, 1935, to provide a suitable dock at the
turning basin, which shall be open to the public on just and equal
terms; to build a dike for retaining dredged material along the south
shore of the thoroughfare west of the bridge; to provide necessary
lands behind the dike for the deposit of dredged material; and to
construct a suitable road for free public use along the water front
connecting with the local road system. These conditions have been
met, except that the dock and road have not been built.
   Under the River and Harbor Act of August 26, 1937, local interests
are required to furnish free of cost to the United States necessary
rights-of-way and suitable spoil-disposal areas for new work and
subsequent maintenance as required. It is provided further that the
work of improvement shall not be undertaken until local interests
have constructed or entered into firm contract for the construction of
a suitable public wharf at the turning basin in accordance with plans
approved by the Chief of Engineers, together with a suitable road
along the waterfront connecting with the local road system.
    Terminal facilities.-The only terminals on the north end of Deals
Island are a small packing house wharf along the shore of Tangier
Sound south of the project channel and the steamboat pier on the
west side of the island. The pier has not been in use since the cessa-
tion of steamer service in 1935. There are two small packing houses
along the approach channel at which seafood is landed.
    Operations and results during fiscal year.-None.
    Condition at the end of fiscal year.-No work has been done
under the modified project and the condition is as described in the
project document. The existing project, prior to the modification
authorized by the River and Harbor Act of August 26, 1937, was
completed in 1934. The total cost and expenditures (Public Works
funds) were $37,342.70, all for new work.
    Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
    The sum of $26,000 can be profitably expended during the fiscal
year 1939 in completion of the project by contract dredging.
               RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                                                             361
                                     Cost and financial summary

Cost of new work to June 30, 1937--------------    ----------- 1 $37, 672. 79
Cost of maintenance to June 30, 1937---------------------------------
      Total cost of permanent work to June 30, 1937-------------                                             37, 672. 79
Net total expenditures-----    -----------------------------                                                 37, 672. 79
Total amount appropriated to June 30, 1937_        --_     -                                               '37, 672. 79

           Fiscal year ending June 30                 1933        1934           1935              1936              1937


Cost of new work---....-. ...-               ..----_              $37, 044. 10
                                                       _--- _---------         $298. 60 --------------------
Cost of maintenance_--.-__.-.           --___- -----------------------------             -------------------
Total expended....---------------------        ------------     37, 169. 61        173. 09-------------------
Allotted     -------------------------------       ------- --   47, 000. 00   -9, 657. 30-------                  ------


Amount (estimated) required to be appropriated for completion of
existing project_---------------               --------------------- ---                                   $26, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work----------------------------------                                                       26,000. 00
  1 Includes $37,342.70 Public Works funds.

                                 13. CRISFIELD HARBOR, MD.

   Location.-This harbor is about one-fourth of a mile square and is
situated at Somers Cove, Little. Annemessex River, which at this
point is an estuary of Tangier Sound, on the east side of Chesapeake
Bay. It is 116 miles southeast of Baltimore, Md., and about 95 miles
north by east of Norfolk, Va. (See U. S. Coast and Geodetic Survey
Chart No. 1224).
   Previous projects.-The original project was adopted by the River
and Harbor Act approved March 3, 1875, and modified by the River
and Harbor Act approved March 2, 1907. The cost and expenditures
on these projects prior to the adoption of the existing project were
$87,740.04 for new work and $2,839.46 for maintenance, a total of
$90,579.50. For further details of previous projects, see page 1790
of Annual Report for 1915 and page 432 of Annual Report for 1924.
   Existing project.-This provides for a channel 12 feet deep at
mean low water, 425 feet wide from the 12-foot contour in Tangier
Sound to Somers Cove Light, thence 266 feet wide to the bend about
1,800 feet southwest of the railroad pier, and thence of irregular
width to a point opposite the Consumers Ice Co., 10 feet deep and
100 feet wide from the ice plant to Hop Point; a channel 7 feet deep
and 100 feet wide from the head of the present project channel op-
posite Hop Point eastward 1,300 feet to an anchorage basin of the
same depth, 160 feet wide and 1,200 feet long roughly parallel to
Brick Kiln Road; and a channel 60 feet wide and 7 feet deep from
that depth in Little Annemessex River via Cedar Creek, a land cut,
and Daugherty Creek, to Big Annemessex River, Md. The mean
range of tide is 2.6 feet.
   The estimate of cost of new work, revised in 1937, is $168,000, ex-
clusive of amounts expended on previous projects. The latest (1936)
approved estimate of cost for annual maintenance is $3,000.
362      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The existing project was adopted by the River and Harbor Act of
March 3, 1925 (H. Doc. No. 355, 68th Cong., 1st sess.), and modified
by the River and Harbor Act of August 26, 1937, providing for the
channel 7 feet deep and 100 feet wide from opposite Hop Point to an
anchorage of same depth parallel to Brick Kiln Road (River and
Harbor Committee Doc. No. 2, 75th Cong., 1st sess.), and for the
7- by 60-foot channel in Little Annemessex River (H. Doc. No. 72,
75th Cong., 1st sess.). The latest published maps are in the project
documents.
   Local cooperation.-The River and Harbor Act approved August
26, 1937 (River and Harbor Committee Doc. No. 2, 75th Cong, 1st
sess.), provides that local interests furnish free of cost to the United
States, necessary rights-of-way and suitable spoil-disposal areas for
new work and subsequent maintenance, and that a suitable public
agency acquire and dedicate to public use a strip of land not less than
50 feet wide on the north and west sides of the Federal right-of-way
and between the Federal right-of-way and Brick Kiln Road on the
east side of the basin, and (H. Doc. No. 72, 75th Cong., 1st sess.) pro-
vides that local interests are to furnish free of cost to the United
States necessary rights-of-way and suitable spoil-disposal areas for
new work and for subsequent maintenance as required and shall re-
lease the United States and its contractors from all claims for dam-
ages that may result from dredging operations.
   All prior conditions have been fully complied with.
    Terminal facilities.-The waterfront at Crisfield is composed
largely of solid bulkhead wharves and pile and timber piers. Most
of the wharves are privately owned, but are open to the public on
equal terms. A few of the terminals have mechanical freight han-
dling devices, but the bulk of the freight is moved by hand. Marine
railways and boat repair shops are available.
   Operations and results during the fiscal year.-None.
   Condition at end of fineal year.-The existing project before modifi-
cation by the River and Harbor Act of August 26, 1937, was completed
in 1929. The condition of the existing project is as described in sub-
sequent project documents. The total cost and expenditures have
been $57,210.43 for new work.
   Proposed operations.-No funds are available and no work is
proposed during the fiscal year 1938.
   The sum of $110,500 can be profitably expended during the fiscal
year 1939 in completion of the project by contract dredging.
                         Cost and financial summary

Cost of new work to June 30, 1937-------------------               $144, 950. 47
Cost of maintenance to June 30, 1937------------------------------    2, 839. 46

      Total ---------------------------------------------------      147, 789. 93
Net total expenditures-----------------------------------------      147, 789. 93
Total amount appropriated to June 30, 1937---------------------      147, 789. 93

Amount (estimated) required to be appropriated for completion
of existing project-------------------------------                  110, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work_----------------------                       110, 500. 00
            RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT           363
                      14. POCOMOKE RIVER, MD.

   Location.-This river is a tributary of Pocomoke Sound, an estuary
of and on the easterly side of Chesapeake Bay about 40 miles north
of Cape Charles, Va.
   Previous project.-The original project for Pocomoke River was
adopted June 18, 1878, and modified by the River and Harbor Act of
August 5, 1886. The total costs and expenditures were $20,500 for new
work. For further details see page 1789, Annual Report for 1915.
   Existing project.-This provides for a channel 7 feet deep and 100
feet wide from that depth in Pocomoke Sound through "The Muds"
to deep water in the river, and for a channel 9 feet deep at mean
low water and 100 to 130 feet wide from Shad Landing to Snow Hill,
a distance of about 41/3 miles. The mean range of tide is 2.5 feet and
the extreme tidal range is 3.7 feet under ordinary conditions.
   The estimated cost of new work, revised in 1935, is $165,000,
exclusive of amounts expended under previous projects. The latest
 (1935) approved estimate of cost for annual maintenance is $10,000.
   The existing project as adopted by the River and Harbor Act of
June 3, 1896, which provided for the 9-foot channel from Shad Land-
ing to Snow Hill (Annual Report for 1895, p. 1167), and the River
and Harbor Act of August 30, 1935, provided for the 7-foot channel
from Pocomoke Sound to the river (H. Doc. No. 227, 74th Cong.,
1st seas.), which document contains the latest published map.
   Local cooperation.-The project authorized by the River and Har-
bor Act of 1935 is subject to the requirements that local interests
furnish free of cost to the United States all lands needed for rights-
of-way and suitable spoil areas and release the United States and
its contractors from all claims for damages resulting from the initial
improvement and its maintenance. These conditions have been com-
plied with.
   Terminal facilities.-The present water fronts at Pocomoke City
and at Snow Hill consist of pile and timber bulkheads with earth
fills. Some have warehouses and factories with mechanical han-
dling facilities and rail sidings. Practically all are privately owned,
most of them are in bad repair. Any appreciable increase in com-
merce at Pocomoke City would necessitate the construction of a new
,terminal   and the repair of existing ,terminals. Considerables land
areas are available for the development of additional terminals if
and when needed.
    Operations and results during fiscal year.-Negotiations for local
cooperation and office work prior to commencement of dredging were
in progress at the end of the year. The total expenditures were
$201.33.
   Condition at end of fiscal year.-The project adopted in 1896 was
completed in 1904. The controlling depth at mean low water is 9
feet. No work has been done on the modified project authorized by
the River and Harbor Act of 1935. The total costs of the existing
project have been $14,000 for new work and $8,210.02 for maintenance,
a total of $22,210.02. The total expenditures were $22,411.35.
364                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-The unexpended balance July 1, 1937,
$150,798.67 will be applied to dredging, by contract, of a channel
100 feet wide and 7 feet deep from Pocomoke Sound to deep water
in Pocomoke River through what is known as "The Muds" at the
mouth of Pocomoke River, Md., July 1 to December 31, 1937.
  No funds can be profitably expended during the fiscal year 1939.
                                      Cost and financial summary

Cost of new work to June 30, 1937 --------------------------- $34, 500.00
Cost of maintenance to June 30, 1937--------------------------  8,210. 02
      Total cost of permanent work to June 30, 1937-----------                                               42, 710. 02
Undistributed costs June 30, 1937------      -    __-----                                                        201. 33
            Net total cost to June 30, 1937__                              -----         ---                 42, 911.35
Net total expenditures-------------- -------------                                                          42, 911.35
Unexpended balance June 30, 1937--__------------------------                                               150, 798.67
            Total amount appropriated to June 30, 1937---- -----
                                                           _                                               193, 710. 02

            Fiscal year ending June 30                 1933                       1934   1935    1936                 1937


Cost of new work---------------------........                                ----------- --------------------
                                                                  ------------
Cost of maintenance...............------------------- ----------------------- ----------- ------------ ------------
Total expended----.-------------                ------------ ----------- ----------------- ------                      $201.33
Allotted.----------------------              ----------------------------------                 $151, 000..........


Balance unexpended July 1, 1936                                                                          $151, 000. 00
Gross amount expended-     -------------------------------                                                     201.33

            Balance unexpended June 30, 1937---------------------                                          150, 798. 67
            15. TWITCH COVE AND BIG THOROUGHFARE RIVER, MD.

   Location.-This is a tidal waterway about 4 miles long traversing
Smiths Island, Md., in a southeasterly direction fro'm Chesapeake
Bay on the west to Tangier Sound on the east. (See U. S. Coast
and Geodetic Survey Chart No. 78.)
   Existing project.-This provides for a channel 7 feet deep at
mean low water and 60 feet wide from Twitch Cove on Tangier
Sound through Big Thoroughfare River to a point on Levering
Creek about 800 feet north of the canal at Ewell, Md., and for a
channel 4 feet deep and 25 feet wide around the point between Big
Thoroughfare River and Tylers River. The length of the section
included in the project is about 4 miles. The mean range of tide
is 1.7 feet and the extreme tidal range is 3 feet under ordinary
conditions.
   The estimate of cost for new work, revised in 1935, was $34,900.
The latest (1935) approved estimate for annual cost of maintenance
is $1,200.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 285, 62d Cong., 2d sess.); which provided
for a 4-foot channel, the River and Harbor Act of July 3, 1930
 (H. Doc. No. 313, 71st Cong., 2d sess.), provided for the 5-foot
           RIVERS AND HARBORS-BALTIMORE,                              MD., DISTRICT                       365
channel, and the River and Harbor Act of August 30, 1935 (Rivers
and Harbors Committee Doc. No. 67, 74th Cong., 1st sess.), provided
for the 7-foot channel. The latest published maps are in House Doc-
ument No. 313, Seventy-first Congress, second session, and Rivers
and Harbors Committee Document No. 67, Seventy-fourth Congress,
first session.
   Recommended modification of project.-Under date of September
22, 1937, the Chief of Engineers recommended modification of the
existing project so as to provide a channel 7 feet deep and 60 feet
wide from the head of the existing channel at Ewell through Levering
Creek and Big Thoroughfare River to the vicinity of Swan Point,
i Ihence of the same depth and 100 feet width through the offshore
bar to deep water in Chesapeake Bay, with twin jetties at the en-
trance; at an estimated initial cost of $131,000, with maintenance
estimated at $2,500 annually in addition to the amounts now re-
quired; subject to certain conditions of local cooperation (Rivers and
Harbors Committee Doc. No. 49, 75th Cong., 2d sess.).
   Local cooperation.-The project as modified August 30, 1935, re.
quires that local interests furnish the lands required for the im-
provement and for the disposal of dredged materials. These condi-
tions have been complied with.
   Terminal facilities.-There are nine small open-pile wharves pri-
vately owned open to general public use, which are considered
adequate for existing commerce.
    Operations and results during fiscal year.--Dredging by contract
for completion of the modified project was commenced December 3,
1936, and completed February 1, 1937. A total of 78,764 cubic yards
of material was removed. The total costs all for new work were
$16,000. The total expenditures were $16,000.
    Condition at end of fiscal year.-The existing project was com-
pleted in February 1937, at a saving of $6,500 under the estimated
cost. The controlling depth ascertained in February 1937 is 7 feet.
The costs and expenditures have been $28,400 for new work and
$13,300.59 for maintenance, a total of $41,700.59.
    Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939.
                                  Cost and financial summary
Cost of new work to June 30, 1937---------                  ---------              _    ---   $28, 400. 00
Cost of maintenance to June 30, 1937----                  -------------                        13, 300. 59
      Total cost of permanent work to June 30, 1937-------------41, 700. 59
Net total expenditures------------------------------------- 41, 700. 59
Total amount appropriated to June 30, 1937--------------------41, 700. 59

        Fiscal year ending June 30              1933      1934          1935           1936          1937

Cost of new work       ----------------------------------------------------------                 $16,000.00
Cost of maintenance------------   -- ----------------    $258.61  $12,541.98-------               -----


Total expended     -------------------------- ---------    258. 61    12, 541.98 ------------       16, 000. 00
Allotted_--- ----------..
                     .    . --.--...   . ----------..
                                              .258.              61   12, 541.98 ...          .     16, 000. 00
366      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Appropriation Act approved
April 26, 1934-------------------- ----------------------------      $2, 000. 00
Amount allotted from War Department Appropriation Act approved
May 15, 1936-----------------------------------                      14, 000. 00
      Amount to be accounted for_                           ____-_______________-____
                                                                       16, 000. 00
Gross amount expended_______------ ----------           $16, 021.55
Less reimbursements collected___________--_______             21. 55
                                                                       16, 000. 00

                       16. STARLINGS CREEK, VA.

   Location.-Starlings Creek is an estuary of Pocomoke Sound at
the southerly end of Saxis Island, Accomac County, Va., about 11
miles southeasterly of Crisfield, Md.
   Existing project.- This provides for a channel 7 feet deep and
60 feet wide from that depth in Pocomoke Sound to the mouth of
Starlings Creek, with a turning basin of the same depth and 1,000
feet long inside the entrance, all essentially as shown on the project
map. The mean tidal range is about 1 foot at mean low water.
   The estimate of cost for new work, made in 1935, was $27,000. The
latest (1935) approved estimate of cost for annual maintenance is
$1,000. The existing project was adopted by the River and Harbor
Act of August 30, 1935 (Rivers and Harbors Committee Doc. No. 46,.
74th Cong., 1st sess.). This document contains the latest published
map.
   Local cooperation.-The requirement that local interests construct
bulkheads to form a public terminal and furnish, free of cost to the
United States, spoil-disposal areas as needed for new work and
future maintenance has been complied with.
   Terminal facilities.-Bulkhead as required under local cooperation.
   Operations and results during fiscal year.-Dredging by contract
for completion of the project was commenced February 8, 1937. and
completed April 18, 1937. A total of 80,297 cubic yards of material
were removed. The total costs, all for new work, were $16,537.47.
The total expenditures were $16,537.47.
   Condition at end of fiscal year.-The project was completed in
April 1937, at a saving of $10,462 under the estimated cost. The
controlling depth is 7 feet ascertained in April 1937. The total
costs, all for new work, were $16,537.47. The expenditures were
$16.537.47.
   Proposed operations.--A portion of the unexpended balance July
1, 1937, $1,462.53, will be applied to payment of outstanding liabil-
ities, and the balance is available for revocation. No work is pro-
posed during the fiscal years 1938 and 1939.
                         Cost and financial summary

Cost of new work to June 30, 1937______________________________     $16, 537. 47
Cost of maintenance to June 30, 1937_
      Total cost of permanent work to June 30, 1937___________       16, 537. 47

Net total expenditures __________-__16,                                  537. 47
Unexpended balance June 30, 1937 ______________--------_              1, 462. 53
      Total amount appropriated to June 30, 1937 ------------        18, 000. 00
           RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                                    367

       Fiscal year ending June 30         1933      1934       1935       1936         1937


Cost of new work...----------- ------------ ------------ --------- ------------ $16, 537. 47
Cost of maintenance-----------------------------------------------------------     ---
                 --------------------------- ------------ ------------ -----------
Total expended......                                                                   16, 537. 47
Allotted--------------------------------------------------------------------           18, 000. 0


Amount allotted from War Department Appropriation Act approved
May 15, 1936-----------------------------------------------   $18, 00. 00
Gross amount expended__------                                                    16, 537. 47
     Balance unexpended June 30, 1937------------------_    ___                      1, 462. 53
Amount covered by uncompleted contracts--------------------------                       858. 86
       Balance available June 30, 1937---                                 __           603. 67

                               17. ONANCOCK RIVER, VA.

   Location.-This river, a tidal stream, rises in Accomack County,
Va., flows in a westerly direction about 6.5 miles and empties into
Chesapeake Bay. The portion under improvement extends from
the mouth of the river to Onancock, Va., a distance of about 5 miles,
which is the approximate length of the tidal reach. (See U. S. Coast
and Geodetic Survey Chart No. 1223.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1879, and was modified by the River
and Harbor Act of September 19, 1890. The modified project was
superseded by a project adopted by the River and Harbor Act of
June 25, 1910, work under which was completed in 1911. The cost
and expenditures on all projects prior to the adoption of the existing
project were $58,302.78, of which $33,549.02 was for new work and
$24,753.76 was for maintenance. For further details of previous
projects see page 1799 of Annual Report for 1915 and page 493 of
Annual Report for 1924.
   Existing project.-This provides for a channel 12 feet deep at
mean low water, 200 feet wide across the bar, a distance of 5,200
feet, and generally 100 feet wide in the river to a point roughly
1,200 feet above the mouth of the north branch, widened at the upper
end to form a basin 200 feet square; a turning basin about 2.3 acres
in area at Onancock with the understanding that the initial dredg-
ing in the river shall be 10 feet only. Full project depth to be pro-
vided if the needs of commerce are later found to demand it. A
channel 6 feet deep and 100 feet wide in the lower 500 feet of Joynes
Branch and an anchorage basin 6 feet deep and 3.9 acres in area at
the mouth of Titlow Creek. Under ordinary conditions the mean
tidal range is 1.7 feet and the extremes are 1.5 and 2 feet.
   The estimate of cost for new work revised in 1937, exclusive of
amounts expended on previous projects, is $137,045. The latest
 (1937) approved estimate for annual cost of maintenance is $5,500.
The existing project was adopted by the River and Harbor Act of
March 3, 1925 (H. Doc. No. 219, 68th Cong. 1st sess.), and modified
by the River and Harbor Act of August 26, 1937, to extend the 12-
foot channel above the mouth of the north branch, with a basin at
        20196-37--pt. 1-24
.368           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the upper end, and for a channel 6 feet deep in Joynes Branch and
anchorage basin at mouth of Titlow Creek (H. Doc. No. 74, 75th
Cong., 1st sess.). The latest published map is in the last mentioned
project document.
   Local cooperation.--The River and Harbor Act of August 26,
1937, provides that local interests furnish free of cost to the United
States suitable disposal areas for new work and subsequent
maintenance.
   Terminal facilities.-There are 5 small timber wharves on this
river with a total wharfage space of about 980 linear feet as follows:
Three at Onancock and one each at Poplar Cove and Finneys. Ves-
sels are permitted to tie up at the wharves without charge. Two
wharves at Onancock are privately owned but are open to general
public use upon payment of wharfage. A county road extends to
each of them.
   Operation and results during fiscal year.-Work under contract
for completion of the project adopted by the River and Harbor Act
,of March 3, 1925 was continued until August 8, 1936. A total of
166,744 cubic yards of material was removed. The total costs, all for
new work, were $20,580.72. The expenditures were $28,969.05.
   Condition at end of fiscal year.-The project adopted by the River
and Harbor Act of March 3, 1925, was completed in August 1936
at a saving of $25,792 under the estimated cost. No work was done
under the project as modified by the River and Harbor Act of
August 26, 1937. The controlling depth in the river is 12 feet at
mean low water ascertained in August 1936 and the condition of the
remaining portions of the project is as described in House Document
No. 74, Seventy-fifth Congress, first session. The total costs have
been $87,982.92, of which $85,753.13 was for new work and $2,229.79
for maintenance. The total expenditures were $87,982.92.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
   The sum of $25,500 can be profitably expended during the fiscal
year 1939 in completion of project by contract dredging.
                                          Cost and financial summary

Cost of new work to June 30, 1937                                                                                         $119, 302. 15
Cost of maintenance to June 30, 1937-----------------------                                                     ------      26, 983. 55
      Total cost of permanent work to June 30, 1937                                                 ------------           146, 285. 70
Net total expenditures ----     ___-_______--___-                                                                          146, 285. 70
Total amount appropriated to June 30, 1937 ---- ________________                                                           146, 285. 70

           Fiscal year ending June 30                               1933                1934         1935          1936          1937


Cost of new work-....----------------------------------                                                          $9, 054. 34   $20, 580. 72
Cost of maintenance-.............................
Total expended--               ..-----------.............--------          ..........          ............         666. 01     28, 969.05
Allotted          .                     ----------------------------
                               .....--...-----..-------                                        ..------------    37,000.00     -7,364.94
           RIVERS AND HARBORS--BALTIMORE, MD., DISTRICT                   369
IBalance unexpended July 1, 1936--------------         ------       $36,333.99
Deductions on account of revocation of allotment- ---------------     7, 364. 94

      Net amount to be accounted for- ..----------- ----- 28, 969. 05
Gross amount expended-----------------------------------28, 969. 05
Amount (estimated) required to be appropriated for completion of
existing project   ----------------------------------------         25, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work      ----------------------------------      25, 500.00

                       18. CHINCOTEAGUE BAY, VA.

    Location.-Chincoteague Bay is a shallow sound on the Atlantic
coast of Maryland and Virginia. Greenbackville and Franklin City
occupy low-lying ground on the westerly shore of the bay 41/2 miles
from its southwest end. (See U. S. Coast and Geodetic Survey Chart
No. 1220.)
    Existing project.-This provides for an L-shaped harbor 5 feet
deep, 60 feet wide, and 1,500 feet long, with an approach channel of
the same depth and width in Chincoteague Bay. The mean range
of tide is about 2 feet.
    The estimate of cost of new work, made in 1937, is $25,700. The
latest (1937) approved estimate of cost for annual maintenance is
'$1,000. The existing project was adopted by the River and Harbor
Act of August 26, 1937 (H. Doc. No. 233, 75th Cong., 1st sess.).
The latest published map is in the project document.
    Local cooperation.-Local interests are required to furnish free of
cost to the United States a right-of-way for the harbor not less than
120 feet wide and suitable spoil-disposal areas for new work and
for subsequent maintenance as required, and release the United States
and its agents from all claims for damages attributable to the work
of improvement. It is provided further that the board of super-
visors of Accomac County or other duly constituted public agency
acquire and reserve for public use in connection with the harbor the
land between the harbor and the county road to the westward and a
strip of land at least 50 feet wide extending continuously along the
northwest margin of the required Federal right-of-way for the inner
basin.
    Terminal facilities.-A public marginal wharf with highway con-
nection has been built along the south side of the channel. The
Pennsylvania Railroad owns and operates a water terminal at
Franklin City, and there are a number of other smaller wharves
:scattered along the water front.
     Operations and results during fiscal year.-None.
    .Condition at end of fiscal year.-No work has been done on the
existing project. In 1936 local interests with the aid of Federal
funds dredged a channel about 3.5 feet deep, 35 feet wide, and 650
feet long in the marsh at Greenbackville at a point about 2,000 feet
west of the railroad pier at Franklin City. The condition is as
 -described in the project document.
    Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
370      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The sum of $25,700 can be profitably expended during the fiscal
year 1939 in completion of the project by contract dredging.
                         Cost and financial summary
Cost of new work to June 30, 1937__________________        ______-------
Cost of maintenance to June 30, 1937

      Net total expenditures___
Total amount appropriated to June 30, 1937________________________-------

Amount (estimated) required to be appropriated for completion of
existing project---------        ---------------------------------   $25, 700
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work      -------------------------------------         25, 700
         19. OCEAN CITY INLET AND SINEPUXENT BAY, MD.

    Location.--Ocean City is oin a barrier island between Sinepuxent
Bay and Atlantic Ocean about 35 miles south of the entrance to
Delaware Bay. (See U. S. Coast and Geodetic Survey Chart No.
1220.)
    Existing project.-This provides for the construction of an inlet
between the Atlantic Ocean and Sinepuxent Bay, with a depth of
10 feet and width of 200 feet, protected by jetties; a channel 8 feet
deep and 100 feet wide from the inlet through Sinepuxent Bay to
Ocean City; a channel 6 feet deep and 150 feet wide from the inlet
to Green Point, and thence 100 feet wide into Chincoteague Bay;
a channel 10 feet deep at mean low water, 100 feet wide, and 3,000
feet long from the inlet channel into the marsh area south of the
railroad on the west side of Sinepuxent Bay, with two turning basins
of the same depth; and for a channel 6 feet deep and 125 feet wide
from the inlet channel to a point opposite North Eighth Street in
Ocean City, thence 75 feet wide into Isle of Wight Bay.
   The estimate of cost for new work, revised in 1935, was $870,000,
including $500,000 contributed by local interests. The latest (1935)
approved estimate for annual cost of maintenance is $32,000. The
mean range of ocean tide is 3.4 feet.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 38,
72d Cong., 1st sess., and Rivers and Harbors Committee Doc. No.
60, 74th Cong., 1st sess.). Prior to adoption by the 1935 River and
Harbor Act, the project recommended in Rivers and Harbors Com-
mittee Document No. 38, Seventy-second Congress, first session, was
authorized September 16, 1933, by the Public Works Administration
and the project recommended in Rivers and Harbors Committee Doc-
ument No. 60, Seventy-fourth Congress, first session, was authorized
under the Emergency Relief Appropriation Act of 1935. The latest
published maps are in the project documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Numerous wharves and landings of pile and
timber construction are located along the bay and the marsh channel
at Ocean City.
   Operai;ons and results duwing fiscal ear--Emergency Relief
funds.-Dredging the channel to Isle of Wight Bay was continued
luntil August 6, 1936. A total of 191,449 cubic yards of material were
          RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                                    371

removed, completing the project as modified. The total costs all for
new work were $19,283.44. The expenditures were $25,993.59.
    Maintenance and improvement funds.--Maintenance dredging by
 ,contract in the Inlet was commenced September 15, 1936, and was in
progress at the end of the year. A total of 175,296 cubic yards of
material were removed. Minor repairs to both the north and south
jetties were made by hired labor and were in progress at the end
of the year. A wooden sheet pile bulkhead for the prevention of
flow of sand into the inlet was under construction at the close of
the year. The total costs, all for maintenance were $107,875.99.
'The total expenditures were $84,562.43.
    Condition at end of fiscal year.-The project was completed in
August 1936. The controlling depth at mean low water is 5.3 feed
in the inlet, thence 5 feet to the end of the channel in Chincotcague
Bay and 10 feet in the fishing harbor and 5.9 feet in the channel to
Isle of Wight Bay. The total costs from all funds of the existing
project have been $966.689.73, of which $283,007.93 were Public Works
funds, $67,185.09 Emergency Relief funds and $500,000 contributed
funds for new work and $116,496.71 regular funds for maintenance.
The total expenditures have been $943,479.74 of which $283,007.93
were Public Works funds, $67,185.09 Emergency Relief funds, and
$93,286.72 regular funds, a total of $443,479.74 United States funds,
and $500,000 contributed funds.
   Proposed operations.-The unexpended balance July 1, 1937,
$27,713.28, and an allotment of $32,000 made in July, will be applied
as follows:
Accounts payable June 30, 1937--------------------------------$23,     209. 99
-Maintenance :
    Dredging by contract of the inlet and connecting channels in
      Sinepuxent Bay and in other sections where needed July 1,
      1937, to June 30, 1938----------------------------------     16, 000. 00
    Complete construction of bulkhead, concrete wall, and concrete
      cap at the north jetty, under existing contract, July-August
      1937-----------------------------------------------------     5, 500. 00
    Maintenance by hired labor of jetties where needed, July 1,
      1937, to June 30, 1938--------------                         15, 003. 29

           Total--                                __-----------------------------_ 59, 713.128
  The additional sum of $32,000 can be profitably expended during
the fiscal year 1939, in the maintenance of inlet and connecting
channels and jetties where needed.
                          Cost and financial summary

                     MAINTENANCE AND IMPROVEMENT          FUNDS

Cost of new work to June 30, 1937__________--
                                           --     _-______--12                $283, 007. 93
Cost of maintenance to June 30, 1937--------------------------                 116, 496. 71
      Total cost of permanent work to June 30, 1937         ----------         399, 504. 64
Minus accounts payable June 30, 1937-------------------------                   23, 209. 99
     Net total expenditures---------------------------------                12 376, 294. 65
Unexpended balance June 30, 1937 ....-----         -1111------                  27, 713.28
      Total amount appropriated to June 30, 1937 ----------                 12404,007. 93
  1Includes $283,007.93 Public Works funds.
   In addition $500,000 was expended from contributed funds.
372              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, I937


           Fiscal year ending June 30                             1933                   1934                 1935                 1936               1937


Cost of new work-------------------------
Cost of maintenance-new
            work      -- --.........----.--------
                                                 ----------- -----------
                                                              _$606.44 ----
                                                                                                         --          - -    -       ---           --------
                                                                                                                                $8, 014.28- $107,875.99
Total expended..................---------------------       -----------------------                            414.08            8, 310. 21          84, 52. 43
Allotted................._....._._                                                                        30,000. 00 ----------                      91,000.00


Balance unexpended July 1, 1936_______                                                                                                        $21, 275. 71
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936.__-_                            __                                                                                           91, 000. 00 ,

      Amount to be accounted for__________                                                                                                    112, 275. 71
Gross amount expended________________________ $84,725.55
Less reimbursements collected ---------    ___-   163. 12
                                                                                                                                                  84, 562. 43
      Balance unexpended June 30, 1937__-----__--                                                               _-------                          27, 713. 28a
Outstanding liabilities June 30, 1937______________                                                              $463. 84
Amount covered by uncompleted contracts________                                                               27, 571. 59
                                                                                                                                                  28, 035. 43-

     Balance available June 30, 1937 _                                                                                                             -322. 15
Amount allotted from War Department Civil                                                            Appropriation
Act approved July 19, 1937___     ______                                                                      __                                 32, 000. 00'

           Balance available for fiscal year 1938 ________________--                                                                              31, 677.85

Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance
                                3
                                                               -                                                                                  32, 000. 00'
    8 Exclusive of available funds.

                                              EMERGENCY                    RELIEF FUNDS

Cost of new work to June 30, 1937-------------------------------                                                                             $67, 185. 09'
Cost of maintenance to June 30, 1937__________

      Total cost of permanent work to June 30, 1937 __-------                                                                             -__ 67, 185. 09
Net total expenditures_-------------    -    __      -   -                                                                                        67,185. 09;
Total amount appropriated to June 30, 1937----------------------67,                                                                                  185. 09

           Fiscal year ending June 30                              1933                   1934                1935                 1936               1937


Cost of new work         _____               ........   _      _______          _ ____...........   ___ __......................._ $47, 901. 65     $19, 283. 44
Cost of maintenance-----------.-----                                                -----               --------------                              - ------
Total expended------------ .                 -----          ------           --------------------------                         41, 191. 50          25, 993. 59
Allotted--------------------                         --------------------------------                                ----       67,185.09 ..


Balance unexpended July 1, 1936-                                                                   -          --             _--_---- $25, 993.59
                                                                                                                             -___
Gross amount expended_-------------------------------                                                               $28, 529. 40
Less reimbursements collected _______--________-_                                                                      2, 535. 81
                                                                                                                                                  25, 993. 591

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR OCEAN CITY INLET, ETC.

Cost of new work to June 30, 1937____________________ -    - 12 $350, 193. 02
Cost of maintenance to June 30, 1937___-- __________--__1-------16, 496. 71
           Total cost of permanent work to June 30, 1937-------                                                                               466, 689. 73
    1 In addition, $500,000 was expended from contributed funds.
    2 Includes $283,007.93 Public Works funds.
              RIVERS AND HARBORS--BALTIMORE, MD., DISTRICT                                                        373"
Minus accounts payable June 30, 1937__-                                                                $23, 209.99

     Net total expenditures________--.------           -                                           12 443, 479. 74
Unexpended balance June 30, 1937_------------------------                                              27, 713.28
        Total amount appropriated to June 30, 1937-------------                                       2 471,    193. 02

        Fiscal year ending June 30                1933           1934           1935           1936             1937


Cost of new work-_---__.__.---.--__
                               ......    _------             $188, 815. 38   $84, 208.78    $57, 885. 42      $19, 283. 44
Cost of maintenance_,__ _-----       __-..      -------                           606.44      8, 014. 28      107, 875. 99
                                               .
      Total cost.-----.--------------------__.___             188, 815. 38    84, 815. 22    65, 899. 70      127, 159. 43

              ..... .-----------
Total expended_------                       _     ________    123, 841.49    139, 965.69     69, 116. 54      110, 556. 02

Allotted __   ___   __ __. .....            __              281, 000. 00
                                                          _.....              66, 000.00     33, 193. 02       91, 000. 00'


Balance unexpended July 1, 1936------------------------------_                                         $47, 269. 30-
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936------------ ----------------------------                                              91, 000. 00

      Amount to be accounted for---------- -------                                                     138, 269. 30
Gross amount expended-------------------------- $113,254. 95
Less reimbursements collected ----       __--------2, 698. 93
                                                                                                           110, 556. 02

      Balance unexpended June 30, 1937--------- -------- ------                                            27, 713. 28
Outstanding liabilities June 30, 1937__ -------------   $463. 84
Amount covered by uncompleted contracts ---------     27, 571. 59
                                                                                                           28, 035. 43

     Balance available June 30, 1937--------       ---------                                                 -- 322. 15
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------                                              32,000.00

        Balance available for fiscal year 1938_                                                       -31,  677. 85
                                                                                                        3-----------------

Amount that can be profitably expended in fiscal year ending
June 30, 1939 for maintenance 3----------------------------                                               32, 000. 00
   1In addition,   $500,000 was expended from contributed funds.
   2Includes   $283,007.93 Public Works funds.
   8 Exclusive  of available funds.

                                    20. FISHING CREEK, MD.

   Location.-The creek is a narrow winding tidal stream which
enters Chesapeake Bay from the west 56 miles south of Baltimore
and about 26 miles south of Annapolis, Md. (See U. S. Coast and
Geodetic Survey Chart No. 1225.)
   Existing project.-This provides for a channel 7 feet deep with
widths of 100 feet and 60 feet from deep water in Chesapeake Bay
to an anchorage of the same depth, 120 feet wide and 400 feet long,.
located in the marsh 500 feet above the mouth of the creek and for
twin stone jetties at the entrance. The mean tidal range is aboutl
1 foot.
   The estimate of cost of new work made in 1937 is $97,000. The
latest (1937) approved estimate of cost for annual maintenance is.
$2,500.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 241, 75th Cong., 1st sess.). The latest
published map is in the project document.
374       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.--Local interests are required to remove the
existing highway bridge near the mouth of the creek and construct
a new bridge with highway connections above the proposed basin,
furnish free of cost to the United States suitable spoil-disposal
areas for the new work and for subsequent maintenance as required,
and a right-of-way with widths of 120 feet for the channel and 200
feet for the basin. It is provided further that the city of Chesapeake
Beach, the county commissioners of Calvert County, or other duly
authorized public agency acquire and retain the title to a strip of
land at least 50 feet wide abutting the required Government right-
of-way on the west side of the harbor and provide a suitable high-
tway approach thereto.
   Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done, and the
condition is as described in the project document.
   Proposed operations.-No funds are available, and no work is pro-
posed during the fiscal year 1938.
   The sum of $97,000 can be profitably expended during the fiscal
year 1939, as follows:
New work :
   Dredging by contract--____     ___._-_________-_                       $35, 50
   Stone jetty construction by contract ____________-____-___--__-_        61, 450
            Total _          ---------------------------------              7,000

                            Cost and financial summary

Cost of new work to June 30, 1937_----------------
Cost of maintenance to June 30, 1937-                            ------

      Net total expenditures
Total amount appropriated to June 30, 1937____________---_________---

Amount (estimated) required to be appropriated for completion of
existing project-----------------------------                             97,000
Amount that can profitably be expended in fiscal year ending June 30,
  1939, for new work----_--------------                                    97,000

                            21. PARISH CREEK;,       D.

   Location.-Parish Creek is a small branch of the West River, an
estuary of the Chesapeake Bay on the Maryland western shore, about
7 miles south of the mouth of the Severn River.
   Existing project.-The existing project provides for a channel 8
feet deep and 50 feet wide, widened at the ends, from deep water in
West River to the head of the south fork of Parish Creek, and an
anchorage basin at the junction of the north fork having a depth of
6 feet and an area not exceeding 11/2 acres. The mean tidal range is
about 2 feet.
   The estimate of cost of new work, made in 1931, was $19,300, in-
cluding $1,000 to be contributed by local interests. The latest (1931)
approved estimate of cost for annual maintenance is $300.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. No. 185, 72d Cong., 1st sess.). The latest
published map is in the above-mentioned document.
            RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                                                   375
   Local cooperation.-Localinterests are required to contribute $1,000
toward the cost of the improvement, furnish suitable spoil-disposal
areas free of cost to the Ulnited States, and give assurances satisfac-
tory to the Chief of Engineers that they will provide a suitable
water-freight terminal at the head of Parish Creek, open to all on
equal terms. The total funds required to complete the project were
provided by the Works Progress Administration. Local interests
furnished disposal areas free of cost to the United States. Applica-
tion has been made by the county for a permit to construct a wharf.
Not complied with, except that disposal areas were furnished free
of cost to the United States.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Work under contract for
completion of the project was continued until August 8, 1936. A
total of 54,800 cubic yards of material were removed. The total costs,
all for new work, were $13,877.93. The expenditures were $17,961.22.
   Condition at end of fiscal year.-The existing project was com-
pleted in August 1936. The controlling depth is 8 feet at mean low
water in the channel and 6 feet at mean low water in the anchorage
basin, ascertained in August 1936. The total costs and expenditures,
all for new work, were $19,170.27. These funds were made available
by the Works Progress Administration.
  Proposed operations.-No work is proposed during the fiscal years
1938 and 1939.
                                    Cost and financial suntmary
Cost of new work to June 30, 1937__---__--------------_--------     $19, 170. 27
Cost of maintenance to June 30, 1937_______________-------------------------
        Total cost of permanent work to June 30, 1937-___________-                                 19, 170. 27

Net total expenditures - ----------------------------- --- --------- 19, 170. 27
Unexpended balance June 30, 1937------------------------- --------       129. 73
        Total amount appropriated to June 30, 1937------------------ 19, 300. 00

        Fiscal year ending June 30            1933         1934         1935            1936           1937


Cost of new work--------------------------.------------.
                                                      __________------------          $5, 292.34     $13, 877. 93
Cost of maintenance ------------------   -----        ----     -----                   ----          -----
Total expended   ---....    .....                                      ..         .    1,
                                                                                       1 209. 05      17, 961. 22
Allotted-----------------------           ------------   -----------   --------       19 300. 00


Balance unexpended July 1, 1936______________________________ $18, 090. 95
Gross amount expended ---------------------------------------- 17, 961. 22

        Balance unexpended June 30, 1937 ------------                                  ____           129. 73

                 22. BACK CREEK, ANNE ARUNDEL COUNTY, MD.

  Location.-The creek is a small tidal inlet branching from the
eastern side of the estuary of Severn River just below Annapolis
Harbor (Spa Creek) and 1 mile from the junction of the Severn
River with Chesapeake Bay. (See U. S. Coast and Geodetic Survey
Charts Nos. 1225, 550, and 566.)
371f       IEMPOIs
               T O1F CHIEF              OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for a channel 100 feet wide and
8 feet deep from that depth in Severn River into Back Creek, pro-
tected by a suitable stone jetty on the south side of the entrance.
The mean range of tide is about 0.9 feet.
   The estimate of cost of new work made in 1936 is $27,000. The
latest (1936) approved estimate of cost for annual maintenance is
$1,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. 73, 75th Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-Local interests are required to furnish free
of cost to the United States all rights-of-way and suitable spoil-
disposal areas for new work and for subsequent maintenance as
required.
   Terminal facilities.-There are no commercial wharves on the
creek. A few small pile and timber walkways are scattered along
the shore. Two small marine railways are located a short distance
above its mouth.
   Operations,and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done and the
condition is as described in the project document.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
   The sum of $27,000 can be profitably expended during the fiscal
year 1939, as follows:
New work:
   Dredging by contract------------------------------------                       $5, 000
   Jetty construction by contract -----                   _22,                        000

        Total---        -----------                                               27, 000
                                 Cost and financial summary

Cost of new work to June 30, 1937-----------------------------------
Cost of maintenance to June 30, 1937_

      Net total expenditures__-_                                                    -
Total amount appropriated to June 30, 1937_________                    ________

.Amount (estimated) required to be appropriated for completion of exist-
  ing project----------------  -----------------                         27, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work---------      --------------------------------      27, 000
                            23. ANNAPOLIS          HARBOR, MD.

   Location.--Annapolis Harbor includes certain portions of the
Severn River and College and Spa Creeks bordering the city of
Annapolis, Md.
   Previous project.-Adopted by the River and Harbor Act of June
14, 1880. No work was done on the project. With funds appropri-
ated for this project two shoals were dredged at a total cost and
expenditure of $8,475.42 charged to new work. For further details
see page 348, Annual Report for 1935.
        RIVERS AND HARBORS-BALTIMORE,          MD., DISTRICT      37T
    Existing project.-This provides for a channel 15 feet deep and
100 feet wide from deep water in Severn River to a point opposite
the city slip and an anchorage basin 12 feet deep in Spa Creek below
the county highway bridge, at an estimated cost of $24,000, with
 $2,000 annually for maintenance.
    The existing project was adopted by the River and Harbor Act
of August 30, 1935 (River and Harbor Committee Doc. No. 23, 73d
'Cong., 2d sess.). The latest published map is in this document.
    Recommended modification of project.-Under date of September
22, 1937, the Chief of Engineers recommended modification of the
existing project so as to provide a channel 15 feet deep and 100 feet
wide from deep water in Severn River to a point in Spa Creek
opposite the city slip, and an anchorage basin of 12 feet depth just
below the County highway bridge over the creek, at an estimated
initial cost of $29,500, with maintenance estimated at $2,000 annually
 (River and Harbor Committee Doc. No. 48, 75th Cong., 2d sess.).
    Local cooperation.-The existing project is subject to the provi-
:sion that local interests shall furnish, free of cost to the United
States, suitable areas, properly diked or bulkheaded where neces-
sary, for disposal of dredged materials during initial construction
.and future maintenance when and as needed. Not complied with.
    Terminal facilities.-The water front from the mouth of Spa
Creek to the highway bridge is developed to a large extent for com-
:mercial purposes. On the north bank of the stream, just above the
Naval Academy wall, there is a ferry dock and a lumber wharf, both
'of pile and timber construction. Above the steamboat dock is the
city slip. In addition to an open frontage owned by the city of
Annapolis, this slip is occupied by two oil companies, a sea-food
packing house, a sand-and-gravel yard, an ice plant, and a hardware
and marine supply company. Between the city slip and the bridge a
<concrete bulkhead and a yacht basin have been built.
    On the southern bank of Spa Creek there are four marine repair
plants, two of which are below the bridge. One plant has four
marine railways, with capacities ranging from 50 to 275 tons. Each
'of the other three plants has one railway of about 20-ton capacity.
    Most of the wharves are privately owned and not open to the
public. The old steamboat wharf and the city slip are used by the
public to msome extent. Boats are not generally permitted to land
along the Naval Academy wall. The existing facilities are con-
sidered adequate for present needs.
    "Operationsand results during fiscal year.-None.
    Condition at end of fiscal year.-No work has been done on the
existing project, and the condition is as given in the project docu-
ment.
    Proposed operations.-No work is proposed during the fiscal year
1938. The allotment of $24,000 made in July will be revoked.
    The sum of $24,000 can be profitably expended for new work in
completion of the project during the fiscal year 1939, the work to
lbe done by contract.
378      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                          Cost and financial summary
Cost of new work to June 30, 1937____-__-__ _--------_____'            $8, 475. 42
Cost of maintenance to June 30, 1937__-----------------                ---------

       Total cost of permanent work to June 30, 1937______---------  8, 475.42
Net total expenditures---______-_____-------------                   8, 475. 42
Total amount appropriated to June 30, 1937__________________-----    8, 475. 42
Amount (estimated) required to be appropriated for completion of
  existing project ---------------------------------------------    24, 000. 00

Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work--------------------------------             --    24, 000. 00

                          24. CYPRESS CREEK, MD.

   Location.-The creek enters the south side of Magothy River about
41/2 miles above its mouth. Magothy River, a tidal estuary, enters the
west side of Chesapeake Bay about 19 miles southwest of Baltimore
and 7 miles north of Annapolis, Md. (See U. S. Coast and Geodetic
Survey Charts Nos. 549 and 550.)
   Existing project.-This provides for a channel 7 feet deep and 75
feet wide through the entrance bar, widened to approximately 125
feet at the easterly end by the removal of a small shoal on the north--
erly side. The mean range of'tide is about 1 foot.
   The estimate of cost of new work made in 1937 is $4,300. The latest
 (1937) approved estimate of cost for annual maintenance is $500.
   The existing project was adopted by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 161, 75th Cong., 1st sess.). The
latest published map is in the project document.
   Local cooperation.-Local interests are required to furnish free of
cost to the United States necessary rights-of-way and suitable spoil-
disposal areas for new work and for subsequent maintenance as
required.
   Terminal facilities.-There is a community wharf on Cypress
Creek just above the mouth of Smith Creek. It is accessible to a
public road and open to all on equal terms. There is also a boat
wharf near the mouth of the creek. There are a few small pile and
timber boat landings scattered along the waterway.
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.-No work has been done and
condition is as described in project document.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938. The sum of $4,300 can be profitably
expended during the fiscal year 1939 in completion of project by
contract dredging.
                          Cost and financial summary
Cost of new work to June 30, 1937----------------------
Cost of maintenance to June 30, 1937__________--__________--_____
      Net total expenditures--       _______
Total amount appropriated to June 30, 1937------------------
            RIVERS AND HARBORS-BALTIMORE, MD., DISTRICT                                                                379
Amount (estimated) required to be appropriated for completion of
existing project-----------------------------------------            $4, 300
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work__------------------- --------------------------    4,300
   25. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year amounted to $53,555.11; the ex-
penditures were $51,130.43. The balance unexpended June 30, 1937,
$3,167.78, together with $15,000 allotted during July 1937, will be
applied as needed during the fiscal year 1938 to payment of expenses
incurred under this heading.
  The additional sum of $15,000 can be profitably expended during
the fiscal year ending June 30, 1939.
                                  Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937____________________                                                   $189, 306. 78

      Total cost of permanent work to June 30, 1937                                     --                  189, 303. 78
Minus accounts payable June 30, 1937_-                                                                            3, 133.91

     Net total expenditures__________                                __                                     186, 172.87
Unexpended balance June 30, 1937_                                                                                 3, 167. 78

        Total amount appropriated to June 30. 1937                           --                             189, 340.65

        Fiscal year ending June 30                 1933          1934                  1935         1936             1937

Cost of new work------            --       ----------------
Cost of maintenance__---..---------------$21, 633. 22
                                                                    ------------ ------------
                                                              $15, 287. 91      $17, 020. 90
                                                                                                           ----
                                                                                                $44, 350. 46
                                                                                                                     ------
                                                                                                                   $53.555. 11

Total expended-----___-----------__    -    -- 21. 430. 59     15, 565. 05        17, 054. 30    43, 845. 39        51, 130. 43
Allotted----___.---------------------_24, 751. 29              28, 089. 36        15, 000. 00    41, 000. 00        40, 000. 00


Balance unexpended July 1, 1936_______                                                                         $14, 298. 21
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936______________                    __                                                      40,000.00
      Amount to be accounted for                                                  __            ____ 54, 298. 21
Gross amount expended _________________----___                                      $62, 692. 09
Less reimbursements collected__--___________                                         11, 561.66
                                                                                                     51, 130. 43
      Balance unexpended June 30, 1937-----------------------                                                     3, 167. 78
Outstanding liabilities June 30, 1937---------------------------                                                  4, 069. 42
     Balance available June 30, 1937--------------------------                                                    -901. 64
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937                                                                                          5, 000. 00
                                                                                                                1------------------------------
        Balance available for fiscal year 1938--------------------                                              14, 098.36
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance 1--_--                           ------------------                           15, 000. 00
  1 Exclusive of available funds.
380                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 193T

26. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED'
                           [Commercial statistics for these projects are given in pt. 2 of reportj


                                                                      For last          Cost and expenditures to
                                                                    full report               June 30, 1937                Estimated
                       Name of project                              see Annual                                             required to
                                                                      Report                                                complete
                                                                                                                            complete
                                                                        for-            New work        Maintenance


1.   Elk and Little Elk Rivers, Md.1 2- ......                      _    1932          3 $90, 121. 28     $44, 342. 35 Completed.
2.   Chester River, Md.l---------             -------------              1935             55, 700. 94       61, 257. 78       Do.
3.   Corsica River, Md.......--------------------..............          1932             39, 070. 85       17, 611. 85       Do.
4.   Queenstown Harbor, Md.'-             - _-- __          -- _         1931             44, 858. 27       26, 314. 84       Do.
5.   Claiborne Harbor, Md.'-------------------                           1933             42, 973. 65       48, 584. 27       Do.
6.   Knapps Narrows, Md.....--............------------------             1936             46, 121. 20 --------------          Do.
7.   Tilghman Island Harbor, Md.1 4 5-.....                    ....      1922                  29. 73 -----                  790.
                                                                                                                         $------7,
8.   Tred Avon River, Md.' 8_____________                           _    1923             12, 692. 87        1, 140. 93 $22,000.
9.   LaTrappe River, Md.' 5-------.            ______ _                  1922              8, 063. 87       15, 967. 97 Completed.
10.   Choptank River, Md.....---              .----------------           1931             84, 296. 34       21, 649. 83       Do.
11.   Tuckahoe River, Md. 5______________________                         1923              9, 727. 36        1, 092. 64       Do.
12.   Warwick River, Md.'                   ..----------------------      1922             22, 040. 82       24, 641. 00       Do.
13.   Slaughter Creek, Md.L                        __----___              1922              4, 140. 00           500. 00       Do.
14.       ps.__Md-
      Honga   River and Tar Bay (Barren Island                            1936             27, 667. 94----                     Do.
        Gaps. Md.).'
15. Nanticoke River (including Northwest Fork),                           1923            48, 815. 31      26, 974. 69        Do.
     Del. and Md.'
16. Broad Creek River, Del.l__-_          ____________-                   1935            64, 520. 00      43, 313. 59        Do.
17. Tyaskin Creek, Md. 5....                ........
                            ______________________                        1.923           16, 296. 63      18, 266. 39        Do.
18. Lower Thoroughfare at or near Wenona,                                 1922            12, 200. 00          700.00         Do.
     Deals Island, Md.' 5
19. Broad Creek, Md.     ................---------------...               1932            28, 227. 19      38, 872. 17        Do,
20. Tangier Channel, Va.---------------------                             1935            15, 627. 98       7, 785. 57        Do..
21. Nandua Creek, Va._____----------_---_-                      _         1932             6, 987. 81                 -
                                                                                                             ___-_--•---      Do.
22.   Occohannock Creek, Va.------------------_                           1933            13, 859. 14      14, 315. 20        Do.
23.   Cape Charles City Harbor, Va. 7_--------_                           1920           105, 533. 68      39, 206. 37        Do.
24.   Waterway on the coast of Virginia 1 ...-..                          1931             9, 404. 45      11, 802. 46        Do.
25.   Little Machipongo River, Va.i'--------------                        1931            15, 000. 00 -------------           Do.
26.   Herring Bay and Rockhole Creek, Md.i_..-.                           1931             6,300. 00 --------------           Do.

  1 Channels adequate for commerce.
  2 Awaiting local cooperation for completion to full width for 1,500 feet at lower end of project.
  3 In addition $8,414.09 was expended from contributed funds.
  4 Insufficient potential commerce to justify the improvement.
  5 Abandonment recommended in 1926 (H. Doc. No. 467, 69th Cong., 1st sess.).
  6 Awaiting local cooperation for work in North Fork.
  7 Abandonment recommended in 1915 (H. Doc. No. 524, 64th Cong., 1st sess.).


            27. PLANT ALLOTMENT FOR BALTIMORE,                                                        MD., DISTRICT
                                             Cost and financial summary

Undistributed costs June 30, 1937.-___-      _____-
                                          -________$37,                                                                        499. 28
Plus accounts receivable June 30, 1937--------------------------                                                           11, 038. 24
      Gross total costs to June 30, 1937 ------ __--__--                                                  -___        48, 537. 47
Minus accounts payable June 30, 1937______ __-___        __                                                       -____ 2, 314. 23
      Net total expenditures---
                              __-___-.                                        ____________ -                               46, 223. 24
Unexpended balance June 30, 1937------                                     _____________________                           18, 753. 58
            Total amount appropriated to June 30, 1937_____________                                                        64, 976. 821

Fiscal year ending June 30, 1933                 1933                   1934             1935             1936               1937


Total expended-..................-.                                                   $83, 967. 86
                                                                                  -__-____              -$25, 818. 23      -$11, 926. 39
Allotted-------------------------------- -------------                                  84, 276. 82         7, 300. 00      -12,000. 00


Balance unexpended July 1, 1936__--- ___    ____________ __ __                                                           $18, 827. 19
Deductions on account of revocation of allotment__--                                                                      12, 000. 00'
      Net amount to be accounted for----........------                                                                     6; 827. 19
Gross amount expended---
                       .$160, ___-----        --- _                                                       46. 6
                  RIVERS AND HARBORS-BALTIMORE,                                                             MD., DISTRICT                        381
Less:
    Reimbursements collected-----------                                            $171, 863. 17
    Receipts from sales---------------                                                   109. 90
                                                                                                             $171, 973. 07
                                                                                                                                   -$11, 926. 39
      Balance unexpended June 30, 1937_____       ____---------                                                                             18, 753. 58:
Outstanding liabilities June 30, 1937---------- -----------                                                                                  2, 495.38-

     Balance available June 30, 1937 --------------------------                                                                             16, 258. 204
Accounts receivable June 30, 1937_-----------11-------------                                                                                11, 038. 24

           Unobligated balance available June 30, 1937----------------                                                                      27, 296. 44
                   28. SUSQUEHANNA                             RIVER BASIN-FLOOD                                        CONTROL

   Location.-The river rises in the southern part of New York, and,,
flowing in a general southerly direction for over 400 miles, empties,
into the head of Chesapeake Bay. Above Port Deposit, Md., it is:
nontidal. Its source is 1,194 feet above tide, and the drainage area
is 27,500 square miles. It is extensively used for power purposes.
The maximum estimated discharge is 888,000 second-feet, the mini-
mum 2,250.
   Existing project.-The project provides for the protection of
people and property by levees, retarding dams, channel improve-
ments, etc. The existing project was authorized by the Flood Con-
trol Act of June 22, 1936. The estimated construction cost is $14,-
529,700; the estimated cost of lands and damages is $781,000, as
follows:
                                                                                                                             Construc-       Lands and
                                                                                                                               tion           damages

Williamsport, Pa-..--------..---..--..--..----......................---------------------------..                           $2, 444, 000        $156, 000
Harrisburg, Pa -..-                     .        ....-...                 ..
                                                                  ---------------- ......-....                                1104, 000             5, 200
Sunbury, Pa-------------------                             -----          ----------------------------                            93, 600          15, 600
York, Pa             ..----------------                  ----------.........                                                12, 210, 000
                                                                                                 ........--------------------------             1 390, 000
Milton, Pa------------------------------------------------------                                                         --     263, 900           13, 000
Montgomery, Pa_              ----------------------------------------------------                                               139, 100            5, 200
Muncy, Pa           -------------------------------------------------------                                                     360, 800           11, 100
Jersey Shore, Pa.-----................................-----------------------------------------------......                     395, 900           12, 500
                              --------------------------------------------------
Lock Haven, Pa........................                                                                                      12, 860, 000           39. 000
Bloomsburg, Pa             -----------------------------------------------------                                                131, 300            5, 200
West Pittston, Pa                  ---------------------------------------------------                                         100, 000 --
Swoyerville and Forty Fort, Pa -     -______-.........__.._______-                     ....    _.     529, 800                                    42, 300
Kingston and Edwardsville, Pa__-.......
                                 . __ __  ... ................__ __                 .          . -_1, 658, 200                                    13, 700
Plymouth, Pa....------------------------------------------------------728,                                 000                                    46, 800
Nanticoke, Pa----     --------------------------------------------------                              381, 700                                    13, 500
Wilkes-Barre and Hanover Township, Pa............................------------------------------- 2, 129, 400                                      12, 000
        Total.......---                ......                     ......--------------------------------------------------   14,529,700          781,100

  i Estimate may have to be increased to meet desires of local interests for more complete protection.

   Local cooperation.-See page 6. Local cooperation, as required
by the act, has been met by Kingston and Edwardsville. Sunbury
and York have indicated their willingness to cooperate. Williams-
port, Lock Haven, and Wilkes-Barre have indicated that their co-
operation is probable. Cooperation from Harrisburg is doubtful.
Plymouth will not cooperate.
   Operations and results during fiscal year.-Surveys of all definite
projects have been made. Preliminary office work, field investiga-
tions and subsurface explorations were in progress at the end of the
year. Negotiations for rights-of-way have been in progress. Con-
struction of a levee at Kingston, Pa., was started in April 1937.
382      REPORT OF CHIEF OF ENGINEERS,              U. S. ARMY, 1937

   In addition to funds appropriated for construction of flood-con-
trol protection works there was expended $130,000 for employment
of needy professional and clerical persons to make surveys in con-
nection with flood-control projects authorized by law, along the
Susquehanna River Basin in Maryland and Pennsylvania. The
surveys were completed during the year. The total costs were
$338,032.47 for new work and the total expenditures were $319,636.56.
   Condition at end of fiscal year.-All field surveys for definite
projects have been completed and office studies are 95 percent com-
plete. Construction of a levee at Kingston, Pa., was started in
April 1937 and is 10 percent complete.
   The work remaining to be done at Kingston-Edwardsville, Pa.,
is the completion of earth levees and necessary control works, in-
cluding revetment and intercepting sewers and the construction of
pressure culvert at Toby Creek, including headwalls and underpasses,
the installation of pumping units and automatic flood gates. At
Wilkes-Barre-Hanover Township, Pa., there remains to be done the
completion of earth levees, revetment work and installation of in-
tercepting sewers and the construction of the Ashley, Franklin, and
Breslau storage reservoirs, and the construction of Solomon Creek
culvert, concrete walls, installation of pumping units and flood gates.
The total costs for all new work were $338,032.47. The total
expenditures were $319,636.56.
  Proposed operations, Kingston-Edwardsville, Pa.-The balance
unexpended and accounts receivable July 1, 1937, from funds allotted
from the Emergency Relief Appropriation Act of June 29, 1937,
$1,289,383.26, will be applied as follows:
Accounts payable June 30, 1937-----                                     $17, 814. 37
New work:
    Completion of construction of earth levees with necessary
     control works including revetment and intercepting sewers,
     by hired labor, July 1, 1937, to June 30, 1938_ _ ______--__       311, 388. 89
    Construction of pressure culvert at Toby Creek, including
     headwalls and underpasses, the installation of pumping
     units and automatic floodgates, by contract, July 1, 1937,
     to June 30, 1938------------------------------------------         960, 100. 00
        Total-----------------------------------------------          1, 289, 383.26
   The above work will complete the project.
   Wilkes-Barre-Hanover Township, Pa.-The balance unexpended
July 1, 1937, from funds allotted from the Emergency Relief Ap-
propriation Act of June 29, 1937, $1,827,263.94, will be applied as
follows:
Accounts payable July 1, 1937----------------------------------- $1, 749. 65
New work :
   Completion of construction of earth levees and revetment
     work and installation of intercepting sewers by hired labor,
     July 1, 1937, to June 30, 1938------------------------------       620, 292. 72
   Construction of Ashley, Franklin, and Breslau storage reser-
     voirs, by hired labor, July 1, 1937, to June 30, 19,38--_____      257, 000. 00
   Construction of Solomon Creek culvert, concrete walls along
     river front, head walls and temporary bulkheads, and the
     installation of pumping units and floodgates, by contract,
     July 1, 1937, to June 30, 1938_----------------------------        948, 221.57
      Total ---------------------------------                  ----   1, 827, 263. 94
                 RIVERS AND HARBORS-BALTIMORE,                                                          MD., DISTRICT                                    383
  The additional sum of $835,000 can be profitably expended during
the fiscal year 1939 at the following localities:
Williamsport, Pa--------                                          $200, 000
York, Pa --------------------------------------------------------  500, 000
Wilkes-Barre and Hanover Township, Pa _________-   ___-______ --   135, 000

           Total                                                                                                                                           000
                                                                                                                                                     8--------------------------
                                                 Cost and financial summary

Cost of new work to June 30, 1937_____________---_____________                                                                               $338, 032.47
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937__--___                                                                                       338, 032. 47
Undistributed costs June 30, 1937--__   -----------------  _                                                                                          741. 43
      Net total cost to June 30, 1937-- ___________-__   ______                                                                                  338, 773. 90
Plus accounts receivable June 30, 1937 -___--  __-_____-    ___-_                                                                                       3. 76
     Gross total costs to June 30, 1937 _______                                                    __-                ______   338, 777. 66
Minus accounts payable June 30, 1937------ ----                                                            -                        141. 10
                                                                                                                           -_____-19,
     Net total expenditures ______-- ____---- _______                                                                                          319, 636. 56
Unexpended balance June 30, 1937__--------------------------                                                                                3, 116,643.44
           Total amount appropriated to June 30, 1937 --                                                                 _--_
                                                                                                                        -__-                3, 436,280. 00

       Fiscal year ending June 30                         1933               1934                1935                      1936                       1937


Cost of new work            .___ .    __     .        ___........______-_-......    ...    ...                 ....             ...          .      $338, 032. 47
Cost of m aintenance -------------------....-..                  . . ....     .. . .. ..     .. . . ......                                   .. . .. .
                                                                                                                           . ... - ..--------------
                                                                                                                                         -----..
Total expended -----                 -----                ....                                    ...            ....           ....                 319, 636. 56

Allotted------------          ---                                                                                                                  3, 436, 280.00


Amount allotted from Emergency Relief Appropriation Act, June
   22,     1936----------                                 -------------                                                                $3, 436, 280. 00
Gross amount expended-----------------------                                                        $363, 835. 47
Less reimbursements collected--------------------                                                      44, 198. 91
                                                                                                                                                 319, 636. 56
      Balance unexepended June 30, 1937__________________                                                                                   3, 116, 643. 44
Outstanding liabilities June 30, 1937_______---_____ $36, 731.26
Amount covered by uncompleted contracts-------- 37, 705. 32
                                                                                                                                                  74, 436. 58
     Balance available June 30, 1937------____________ ______                                                                               3, 042, 206. 86
Accounts receivable June 30, 1937_ _------------- -- __ ___                                                                            --        -- 3. 76
           Unobligated balance available June 30, 1937- ._____                                                                  .___ 3, 042, 210. 62
Amount (estimated) required to be appropriated for completion
   of existing project 1--------------_--                                                               -----                           11, 223, 420. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work 1- -- - - - --- ----- - - - - - - - - - - - - - - - - - - - -- --
                                                                                                                                                 835, 000. 00
   1
       Exclusive of available funds.




           20196-37-pt. 1-                       25
384          REPORT OF CHIEF OF ENGINEERS,                                            U. S. ARMY, 1937

       Status of reports called for by river and harbor acts and committee

                                                      Date trans-                                                                    Recommenda-
        Locality             Authorization act         mitted to                          Document no.                                   tion
                                                       Congress

Annapolis Harbor, Md-      Rivers and Harbors
                             Committee resolu-
                            tion, Jan. 27, 1937.
Assateague Channel,
Accomac County, Va.,
                           River and Harbor Act,
                            Aug. 26, 1937..
                                                    --------------- ------------------------
                                                            r- - - - - -   -   - - - - - - - - - - - - -   - - - - - - -   - - - -




and Chincoteague
Island, protection and
preservation from ero-
sion and storm.
Back Creek, Anne           River and Harbor Act,     Oct.     6,1936             House, 73, 75th Cong.,                              Favorable.
Arundel County, Md.        Aug. 30, 1935.                                        1stsess.
Baltimore Harbor and       Rivers and Harbors                                  ........................
Channels, Md.               Committee resolu-
                            tion, Jan. 11, 1932.
    Do-_-----------        River and Harbor Act,                               _- -        - - - -- - - - - -
                            Aug. 26, 1937.
Black Walnut Harbor,       River and Harbor Act,     May 25, 1937              .---.--.-----------                            ..     Unfavorable.
  Talbot County, Md.        Aug. 30, 1935.
Broadwater Creek, Md__       do _
                           ..---            ....--
                                                - - Nov.      7, 1936          .......................                                  Do.
Broadway Road, near        River and Harbor Act,
  Cashville, Accomac        Aug. 26, 1937.
  County, Va., to Onan-
  cock River, channel
  from.
Cambridge Creek to         River and Harbor Act,     Nov. 17, 1936                                                                      Do.
  Fishing Bay, channel      Aug. 30, 1935.
  via Little Blackwater
  River, Md.
Cambridge Harbor, Md_      Rivers and Harbors        Oct.     5, 1936            River and Harbor                                    Favorable.
                             Committee resolu-                                    Committee, 7, 75th
                            tion, July 31, 1935.                                  Cong., 1st sess.
Cherrystone Channel to     River and Harbor Act,                     ------------------------
Cape Charles (Va.)          Aug. 30, 1935.
  Channel.
Chesapeake Ba y to       River and Harbor Act, Apr. 13,1937
  Chincoteague Bay,         Aug. 30, 1935.
Va., inland waterway.
Chincoteague Bay, har- .....----do.................     Apr. 13,1937 House, 233, 75th Cong.,                                            Do.
bor of refuge at Green-                                                    1st sess.
backville and Frank-
lin City, Va.
Chincoteague Bay, Ac- River and Harbor Act, .                        ------------------------
comac County, Va.,         Aug. 26, 1937.
anchorage and harbor
at Chincoteague, Va.
Choptank River, Md_.- ...----   do ................ .... --.......
Choptank (Great) Wa- River and Harbor Act, Nov. 18, 1936 House, 91, 75th Cong.,                                                        Do.
terway to Little Chop-     Aug. 30, 1935.                                  1st sess.
tank River, Md., con-
struction of sea-level
waterway.
Claiborne-Annapolis -.....---   do............... Dec. 12,1936                                                                       Unfavorable.
  Ferry at Matapeake,
  Md., channel at en-
trance.
Claiborne-Annapolis Rivers and Harbors
  Ferry at Matapeake,       Committee resolu-
  Md.                       tion, Jan. 27, 1937.
Crisfield Harbor, Md. _- Rivers and Harbors Aug. 12,1936 Rivers and Harbors                                                          Favorable.
                            Committee resolu-                               Committee, 2, 75th
                            tion, Feb. 27, 1934.                            Cong., 1st sess.
Curtis Creek, Md- .....  Rivers and Harbors --...........            -----------------......
                            Committee resolu-
                            tion, Aug. 21, 1937.
Duck Point Cove and River and Harbor Act, --...........              ........................
  Tedious Creek, Md.        Aug. 26, 1937.
Eli Cove, arm of Stoney ---.....do....-----------------
  Creek, Anne Arundel                                                ........................
  County, Md.
Elk River, Md.......... Rivers and Harbors --.............
                            Committee resolu-
                            tion, Aug. 7, 1934.
Farm Creek, Md....... River and Harbor Act, Mar. 25, 1937 House, 186, 75th Cong.,                                                       Do.
                            Aug. 30, 1935.                                  1st sess.
Fishing Creek, Calvert --- do.--------------- May 1,1937 House, 241, 75th Cong.,                                                        Do.
  County,   Md.,  harbor                                                    1stsess.
  at mouth.
Folly Creek, Accomac River and Harbor Act, -- -. - - -- - ........................
  County, Va.               Aug. 26, 1937.
               RIVERS AND HARBORS-BALTIMORE,                                                MD., DISTRICT                            385

         Status of reports called for by river and harbor acts and committee
                                resolutions--Continued

                                                              Date trans-                                                  Recommenda-
          Locality                Authorization act           mitted to                    Document no.                        tion
                                                               Congress


Fox Creek, Dorchester   River and Harbor Act,                Mar. 25, 1937       House, 186, 75th Cong.,                   Unfavorable.
County, Md., channel     Aug. 30, 1935.                                           1st sess.
in Southeast Branch.
eorge Island Landing, -----do----------------               May 25,1937        ........................                      Do.
Md., to deep water in
Chinooteague     Bay,
  channel..
Goose Creek, Md..-----        ..... do-------------- Mar. 25, 1937               House, 186, 75th Cong.,                   Favorable.
                                                                                   1st sess.
Hearns   Creek,  Dor-           River and Harbor Act, -------------             ......................
chester County, Md.             Aug. 26, 1937.
Herring Bay and Rock-           Risers and Harbors..      . .....
hole Creek, Md.                 Committee resolu-
                                 tion, Jan. 27, 1937.
Herring Bay to West             River and Harbor Act, ---------------           ........................
  River, Anne Arundel            Aug. 26, 1937.
  County, Md., channel
  via Rockhole Creek.
Hog Island, Va., chan-     Rivers and Harbors Apr. 8,1937                       .......            ....    .....   ....   Unfavorable.
  nels to Great Machi-          Committee resolu-
  pongo Inlet.                 tion, Feb. 3, 1934.
Hog Island, Va., protec- River and Harbor Act, -............                     .....................
  tion from erosion and        Aug. 26, 1937.
  storms.
Jefferson Islands, Chesa- .....-- do----..---........---                         ........................
  peake Bay, Md., aid
  to navigation, and har-
  bor of refuge.
Jones Creek and Nanti- River and Harbor Act, May 1,1937                           House, 242, 75th Cong.,                  Favorable.
  coke River in vicinity        Aug. 30, 1935.                                      1st sess.
  of Waterview         and
  Nanticoke, Wicomico
  County, Md.
Jones Creek, Wicomico       ...---do.--------------             ..... do . ..    ... do----------------                        Do.
   County, Md., and
  Nanticoke River.
Knapps Narrows, Md__ Rivers and Harbors                          Nov. 17,1936   ....................--.                    Unfavorable.
                                Committee resolu-
                               tion, Feb. 11, 1936.
Lackawanna River, Pa.       Flood Control Act,
  (preliminary examina-         June 25, 1936.
  tion for flood control).
Little    Annemessex        River and Harbor Act, Sept. 23, 1936                   House, 72, 75th Cong.,                  Favorable.
   River     to   Tangier       Aug. 30, 1935.                                      1st sess.
  Sound, Md., channel
  via Cedar Creek, a
  land cut, and Flat
  Cap Creek.
Little Creet, Queen ..--.. do...----------                       Apr. 10,1937   ------------------------                   Unfavorable.
  Annes County, Md.
Little Island Creek, Tal- ---.... do.......------------.....--- Aug. 13,1936      House, 75, 75th Cong.,                   Favorable.
  bot County, Md.                                                                  1st sess.
Lower      Thoroughfare,    River and Harbor Act,
  Deals Island, Md.            Aug. 26, 1937.
Magothy River to Cy- River and Harbor Act, Feb. 24, 1937                          House, 161, 75th                             Do.
  press Creek, Anne            Aug. 30, 1935.                                      Cong., 1st sess.
  Arundel County, Md.,
  channel.
Marshy Hope Creek,          Flood Control Act, ..                               ........................
  Md. (preliminary ex-         Apr. 10, 1936.
  amination of, for flood
  control).
McCreadys Creek, Elli- River and Harbor Act, Mar. 25, 1937                        House,      186, 75th                       Doi
  ott, Dorchester              Aug. 30, 1935.                                       Gong., 1st sess.
  County, Md.
Middle River and Dark River and Harbor Act,
  Head Creek, Back             Aug. 26, 1937.
  River to Chesapeake
  Bay via Harts Island
  Narrows, and a cut-off
  channel from Gun-
  powder River to Ches-
  apeake Bay via Spry
  Island Narrows, Md.
Mill Creek, Anne Arun- -.... do...........------------
  del County, Md.
Nanticoke River, Del. Rivers and Harbors
  and Md.                      Committee resolu-
                                  tion, Feb. 2, 1937.
386          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

       Status of reports called for by river and harbor acts and committee
                               resolu tions-Continued

                                                         Date trans-                                                               Recommenda-
        Locality             Authorization act           mitted to                            Document no.                         Recommenda-
                                                          Congress

Northeast River, Md., River and Harbor Act, May 14, 1937                           House, 248, 75th Cong.,                         Favorable.
head of.                   Aug. 30, 1935.                                          1st sess.
Ocean City, Md., to River and Harbor Act,           --   -   -   -   -   -   -   - -    - -    -   - -   - -   -   - -   - -   -

  Chincoteague Bay, in-     Aug. 26, 1937.
land waterway.
Ogleton Lake and Wal- River and Harbor Act, Dec. 28,1936                                                                           Unfavorable.
nut Lake, Anne Arun-       Aug. 30, 1935.
del County, Md.,
channels to.
Onancock River, Va .... ..... do------------....... Aug. 13, 1936                  House, 74, 75th Cong.,                          Favorable.
                                                                                    1st sess.
Plain Dealing Creek and    _---. do ..............
  Oak Creek, Md.,
channel connecting.
Plum Point Creek, Cal-     River and Harbor Act,
vert County, Md.            Aug. 26, 1937.
Pocomoke River, at or      River and Harbor Act, Dec. 28, 1936 I-                       -.---                        ---...
                                                                                                                        -.I Unfavorable.
near Snow Hill, Md.,        Aug. 30, 1935.
to Chincoteague Bay,
waterway.
Pocomoke River, Md.,       Rivers and Harbors            .. do ___-----
                                                                    -......................                                           Do.
to Sinepuxent Bay,          Committee resolu-
waterway.                   tion, Mar. 15, 1934.
Pocomoke River, Md.,       River and Harbor Act,
  from Snow Hill to deep     Aug. 26, 1937.
  water in Pocomoke
  Sound.
Pungoteague Creek, Va.     Rivers and Harbors        Jan.        21, 1937 1.-.......-..............                                    Do.
                             Committee resolu-
                             tion, May 10, 1934.
Rockhall Harbor, Kent      River and Harbor Act,     Apr.            2, 1937       House, 204, 75th Cong.,                         Favorable.
  County, Md.                Aug. 30, 1935.                                         1stsess.
Smallers Drain, Assa-      River and Harbor Act,
  teague Island, Va.         Aug. 26, 1937.
Susquehanna River at       River and Harbor Act,     July 22, 1937                 House, 322, 75th Cong.,                             Do.
  Havre de Grace, Md.,       Aug. 30, 1935.                                          1stsess.
  and upper Chesapeake
   Bay.
Susquehanna River, Pa.     Rivers and Harbors Nov. 3,1936                                     _---------------------I              Unfavorable.
  and Md.                    Committee resolu-
                             tion, Mar. 15, 1934.
Town River at Oxford,      River and Harbor Act,
Md.                         Aug. 26, 1937.
Twitch Cove and Big        Rivers and Harbors
Thoroughfare, Md.           Committee resolu-
                             tion, Feb. 17, 1937.
Upper   Thoroughfare,      River and Harbor Act, Aug. 26, 1936                         House, 76, 75th Cong.,                      Favorable.
Deals Island, Md.           Aug. 30, 1935.                                             1stsess.
Wicomico River, Md- -      Senate committee res- Apr. 12,1937                          Senate    committee                             Do.
                             olution, June 27,                                          print, 75th Cong.,
                             1935.                                                      1st sess.



    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            WASHINGTON, D. C., DISTRICT
   This district includes the western shore of Chesapeake Bay be-
tween Cove Point on the north, at the entrance to Patuxent River
and York Point on the south, at the mouth of the Poquoson River,
left bank, and all streams and their tributaries emptying into Chesa-
peake Bay between these limits. The more important rivers are the
Patuxent, Potomac, Anacostia, Rappahannock, York, Mattaponi, and
Pamunkey.
          RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                  387
  District engineer: Maj. R. G. Guyer, Corps of Engineers, to Octo-
ber 29, 1936; First Lt. W. J. Matteson, Corps of Engineers, to Febru-
ary 10, 1937; Maj. W. D. Luplow, Corps of Engineers, since that date.
  Division engineer: Col. Earl I. Brown, Corps of Engineers.
                                       IMPROVEMENTS

                                        Page                                              Page
1. Washington Harbor, D. C___           387 16.   Jackson Creek, Va     --------         409
2. Potomac River, north side of             17.   Milford Haven, Va-- -----.             410
      Washington Channel, D. C_          391 18.   Horn Harbor, Va      ----------        411
3. Potomac River below Wash-                19.   York River, Va     ------------        412
        ington, D. C _ _     -------     392   20. Mattaponi River, Va_____-              414
4. Monroe Bay and Creek, Va__           394 21. Pamunkey River, Va           _.._        415
5. Neale Sound, Md _ _ _                395 22. Channel connecting             York
6. Coan River, Va_         --           396          River,   Va.,    with     Back
7. Little Wicomico River, Va___         397       Creek to Slaight's wharf__             417
8. St. Jeromes Creek, Md .....          399 23. Examinations, surveys, and
9. Rappahannock River, Va___            400          contingencies    (general)     --   419
10.   Hoskins Creek, Va _ _ _            402 24. Other projects for which no
11.   Totuskey Creek, Va- .....  _       403       estimates are submitted- _ _           420
12.   Mulberry Creek, Va- ----- _        404 25. Plant allotment_ -                       420
13.   Urbanna Creek, Va_--------         405 26. Potomac River Basin, flood
14.   Carters Creek, Va---               406       control -----------------              421
15.   Mill Creek, Va------------         407

                           1. WASHINGTON HARBOR, D. C.

   Location.---Washington Harbor is located at the junction of the
Anacostia River with the Potomac River within the District of
Columbia, 110 miles upstream of the mouth of the Potomac River,
southerly 202 miles by water from Baltimore, Md., and northerly 195
miles from Norfolk, Va. (See U. S. Coast and Geodetic Survey
Chart No. 560.)
   Previous projects.-The original project for the Potomac River
was adopted by the River and Harbor Acts of March 2, 1833, July
11, 1870,. and August 2, 1882.. For further details see page 1791 of
Annual Report for 1915, and page 295 of Annual Report for 1934.
The River and Harbor Act of September 19, 1890, authorized an
allotment for work on the Anacostia River, joint resolution of Con-
gress of April 11, 1898, made appropriation for a survey, and a proj-
ect was adopted by the River and Harbor Act of June 13, 1902 (H.
Doc. No. 87, 55th Cong., 3d sess., and Annual Report for 1899, p.
1443). For further details see page 430 of Annual Report for 1932.
The total costs under these previous projects to June 30, 1935, were
$3,029,000.78 for new work and $1,831,609.62 for maintenance, a total
cost of $4,860,610.40. The total expenditures were $4,860,401.98.
   Existing project.-This project is a combination and extension of
the latest projects for the Potomac River at Washington, D. C., and
the Anacostia River, D. C. The project provides (1) Virginia Chan-
nel, from Giesboro Point to the Francis Scott Key Bridge, a channel
24 feet deep and 400 feet wide, with the width increased as necessary
to afford a low-water cross-section area of 25,000 square feet; (2)
388     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Washington Channel, from Hains Point to the head of Washington
Channel, a channel 24 feet deep and 400 feet wide; (3) Anacostia
River, from Giesboro Point to the Anacostia Bridge, a channel 24
feet deep and 400 feet wide, with turning basin 800 feet wide and
approximately 2,400 feet long of same depth opposite the navy yard;
 (4) Anacostia River from the Anacostia Bridge, a channel 24 feet
deep and 200 feet wide to a turning basin 400 feet square of same
depth at the foot of Fifteenth Street SE. The plane of reference is
mean low water. The tidal ranges are: Mean, 3.0 feet; extreme, 4.5
feet; and irregular, 7.5 feet.
   The estimate of cost of new work made in 1935 is $325,000, exclu-
sive of amounts expended on previous projects. The latest (1935)
approved estimate for annual cost of maintenance is $83,000.
    The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 22,
74th Cong., 1st sess.). The latest published maps are in the project
document.
    Terminal facilities.-On the Virginia Channel (Georgetown water
front) there are 10 wharves, generally of the bulkhead type, of timber,
stone, and concrete, privately owned. Railroad and crane service are
available at a number of the wharves. On the Washington Channel
are 30 wharves of open pile and bulkhead construction, all owned by
the Federal Government, but most of which are leased to private
parties or serve governmental agencies. On the Anacostia River are
about 23/4 miles of commercial water front on which are located seven
privately owned and two Government wharves and 3,500 linear feet of
bulkhead with slips for governmental agencies. Some of the wharves
and slips have transfer and rail facilities. The wharves of the Wash-
ington Harbor are only open to the public by special arrangement,
except for the District of Columbia fish wharves on the Washington
Channel.
    Terminal facilities, except for those in the Washington Channel, are
considered adequate for existing commerce.
    Operations and results during fiscal year.-Dredging by con-
tract was in progress from April 1 to June 30, 1937. A total of
411,233 cubic yards was placed in the deposit basin at Gravelly Point
at a total cost of $67,672. The U. S. hydraulic dredge Dalecarlia
was engaged from April 16 to 29 and May 8 to June 30, 1937, re-
handling the material from contract dredging, placing 317,078 cubic
yards in the deposit basin at a cost of $23,085.76. The U. S. hy-
draulic dredge Dalecarlia was engaged from July 1 to August 31,
1936 and from April 30 to May 7, 1937, dredging the entrance chan-
nel and rehandling basin at Gravelly Point, placing a total of 306,-
942 cubic yards in the deposit basin; and the U. S. hydraulic dredge
Talcott was engaged from August 11 to September 15, 1936, dredg-
ing the entrance channel and rehandling basin at Gravelly Point,
placing a total of 229,531 cubic yards in the deposit basin. The
U. S. derrickboat Atlas, on April 20-21, May 6-10, and on May 18,
1937, was engaged in dredging shoal areas in the rehandling basin.
A grand total of 536,473 cubic yards was dredged from the entrance
channel and rehandling basin and placed in the deposit basin at a
total cost of $44,051.13. A total of 221,575 cubic yards of material
was removed from the rehandling basin by privately-owned sand
  and gravel dredges between September 1936, and February 1937,
       RIVERS AND HARBORS--WASHINGTON,                D. C., DISTRICT         389
at no cost to the United States. The U. S. derrickboat Benning,
from July 1 to August 19, 1936, and the U. S. derrickboat Atlas,
from April 21 to May 31, 1937, were engaged in reinforcing the
deposit basin levees at Gravelly Point, 36,964 cubic yards being
handled at a cost of $6,743.79. The tidal gates were operated and
repaired throughout the year at a cost of $2,614.59. Miscellaneous
surveys and investigations were made at a cost of $597.26. The costs
for the year were $144,764.53, of which $46,469.32 was applied to new
work and $98,295.21 was applied to maintenance. The expenditures
were $184,600.34.
  Condition at end of fiscal year.-The previous project for Potomac
River at Washington, D. C., was completed in 1913, and that for the
Anacostia River was completed in 1919. The total costs and expendi-
tures under the former projects which were combined to form Wash-
ington Harbor are stated under "Previous projects." The existing
project is 14 percent completed consisting of partial completion of
deepening channel at Hains Point.
  The controlling depth at mean low water in May 1937 was 16.9 feet
in the Virginia Channel, Potomac River, for a width of 400 feet; in
April 1936, 18.4 feet in the Washington Channel, Potomac River, and
in the Anacostia River in April 1936, 18.4 feet for a width of 300 feet
to the Anacostia Bridge, and in December 1934, 14.0 feet upstream
of the Anacostia Bridge.
  The total costs were $157,205.86, of which $46,469.32 was for new
work and $110,736.54 for maintenance. The total expenditures were
$195,193.19.
  Proposed operations.-The balance unexpended on July 1, 1937,
$195,309.02, including $75,000, accounts receivable, and an allotment
of $40,000 made during July 1937, will be applied as follows:
Accounts payable July 1, 1937______--- ____________-_____--___ $38, 164. 25
New work:
    Dredging forks of the channel at Hains Point and Anacostia
     River from mouth to foot of Fifteenth Street SE., completing
     work in progress under contract, 410,000 cubic yards (July to
     November 1937) --------------------------------------          75, 800.00
    Rehandling material from work in progress under contract, 392,-
     000 cubic yards, with U. S. dredge Dalecarlia (July to Novem-
     ber 1937)-------------------------------------                 21,200. 00
    Rock removal from Virginia Channel between Memorial Bridge
     and Easbys Point, by contract, March to May, 1938    ----------40, 000. 00

      Total new work-----------------------------------------          137, 000. 00

Maintenance:
   Dredging Virginia Channel above Memorial Bridge and forks of
      the channel at Hains Point, completing work in progress under
      contract, 193,000 cubic yards (July to November 1937)------.      37, 700. 00
   Rehandling material from work in progress under contract, 262,-
      000 cubic yards, with U. S. dredge Dalecarlia (July to Novem-
     ber 1937) --------------------------                               14, 000. 00
   Reinforcing levees of Gravelly Point deposit basin with U. S.
      derrick boat Atlas in August 1937____           ____ __ __         2, 000. 00
   Maintenance and repair of tidal gates, Tidal Basin, by hired
      labor (July 1937 to June 1938) _____     ____________________      4, 000. 00
    Surveys and investigations by hired labor (July 1937 to June
     1938)                                                               2, 444.77

        Total maintenance__----- ------         -__
                                               _____----_________-60, 144. 77
        Total for all work _____-...   ___   ___------------__         235, 309. 02
390                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  No funds are requested for new work, as the greater depths in the
Virginia Channel and removal of rock, Easby's Point to Francis Scott
Key Bridge, are not required to serve navigation at this time.
  The sum of $7,000 can be profitably expended during the fiscal year
1939 in maintenance and repair of the tidal gates and for surveys and
investigations.
                                                     Cost and financial summary
Cost of new work to June 30, 1937----------------------------                                                        $3, 075, 470. 10
Cost of maintenance to June 30, 1937-------------------- ------                                                       1, 942, 346. 16

      Total cost of permanent work to June 30, 1937 -------                                                           5, 017, 816. 26
Undistributed costs June 30, 1937------------------------------                                                               943. 16
      Net total cost to June 30, 1937__--------------------------                                                     5, 018, 759. 42
Plus accounts receivable June 30, 1937-------------------------                                                           75, 009. 00
      Gross total costs to June 30, 1937-----------------------5, 093, 759. 42
Minus accounts payable June 30, 1937-------------------------      38, 164. 25
     Net total expenditures--------------------------------                                                           5, 055, 595. 17
Unexpended balance June 30, 1937                                                                                          20, 309. 02
                                                                                                                         1------------------------------
              Total amount appropriated to June 30, 1937-------------                                                 5, 175, 904. 19

     Fiscal year ending June 30                              1933          1934             1935              1936              1937

Cost of new work------------................-..                                                             .      -..         $46, 469. 32
Cost of maintenance-----------.............-            $5, 460. 64      $34, 096. 07    -$6, 968. 62    $12, 441. 33           98, 295. 21

         Total cost.....-----........--------....        5, 460. 64       34, 096. 07     -6, 968. 62        12, 441. 33       144, 764. 53
Total expended..............--------------              14, 379. 73       68, 561. 81   -481, 045. 29        10, 592. 85       184, 600. 34

Allotted..............---------......---------....    -12,     717. 09    43, 330. 95   -509, 716. 50        92, 000. 00       199, 000. 00


Balance unexpended July 1, 1936------------------------------ $105, 909.36
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936---------------------------------------   199, 000. 00
      Amount to be accounted for------------------------------                                                             304, 909. 36
Gross amount expended---------------------------------------                                                               184, 600. 34

      Balance unexpended June 30, 1937------------------------ 120, 309. 02
Outstanding liabilities June 30, 1937_               $34, 326. 43
Amount covered by uncompleted contracts-------------117, 349. 82
                                                                  151, 676. 25
      Balance available June 30, 1937---------------------                                                                 -- 31,367.23
Accounts receivable June 30, 1937----                                                                                         75, 000. 00
     Unobligated balance available June 30, 1937--------------                                                               43, 632. 77
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_ --------------------------------------                                                              40, 000. 00
             Balance available for fiscal year 1938_ __2_-_                                         -_____                   83, 632. 77

Amount (estimated)                            required to be appropriated for completion
     of existing project 1----------------__________                                                                       173, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1_-------_______-  _   ______        _                                                             7, 000. 00
xExclusive of available funds.
       RIVERS AND HARBORS-WASHINGTON,                    D. C., DISTRICT        391
2. POTOMAC RIVER, NORTH SIDE OF WASHINGTON                     CHANNEL, D.         C.

   Location.-The area covered by the project is the north side of the
Washington Channel water front upstream of the War College, all
located in the District of Columbia. (See U. S. Coast and Geodetic
Survey Chart No. 560.).
   Existing project.-This provides for development of the commer-
cial water front of the Washington Channel by construction of (1) a
yacht harbor in four sections on the upstream half of the section, with
berthing space for about 286 boats; (2) two wharves for activities of
the District of Columbia; (3) three wharves for existing transporta-
tion lines and general service; (4) construction of bulkhead walls;
 (5) removal of the old and dilapidated existing structures, etc.
   The estimate of cost of new work made in 1933 is $1,650,000, of
which the District of Columbia is to contribute $389,000, the cost of
the two wharves for District of Columbia activities.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 13, 73d
Cong., 1st sess.).
   Local cooperation.-The approved project provides that the Dis-
trict of Columbia shall contribute $389,000 toward the cost of the
improvement.
   Terminal facilities.-The entire commercial water front is Govern-
ment owned, and of the 30 wharves only 4 can be classed as modern.
The District of Columbia constructed in 1916 a municipal fish wharf
and a harbor police wharf partially completed at a total cost of
$236,360. The facilities are considered inadequate for existing com-
merce. For further details see the project document.
   Operations and results during fiscal year.-Studies, designs, cost,
and quantity estimates have been made on the yacht basins, com-
mercial piers, and buildings, and plans and specifications for con-
tract construction have been prepared for the first unit of scheduled
project work. The U._ S. derrick boat Benning was engaged from
October 15 to 23, 1936, in driving 17 test piles for foundation explora-
tions. The costs were $14,043.15, all applied to new work and the
expenditures were $12,609.72.
   Condition at end of fiscal year.-No work except preparation of
plans and specifications has been done under the project. The con-
trolling depth in Washington Channel was 18.4 feet in April 1936.
The costs were $14,043.15 for new work, and the expenditures were
$12,609.72.
  Proposed operations.-The funds                unexpended      July   1,      1937,
$2,390.28, will be applied as follows:
Accounts payable July 1, 1937-----------------------------------_  $1, 433.43
New work: Preparation of plans and specifications for yacht basin
  units (July and August 1937) -----------------------------------     956. 85

      Total-------------------------------------------                      2, 390. 28
392            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The additional sum of $481,000 can be profitably expended during
the fiscal year 1939, as follows:
New work :
   Construction of downstream half of yacht unit no. 1 by contract
      (October 1938 to June 1939) --       _----------------------------- $205, 000
   Construction of downstream half of yacht unit no. 2 by contract
      (October 1938 to June 1939) ---------------------------------         80, 000
   Construction of a general purpose wharf, about 75 percent in the
     fiscal year (October 1938 to June 1939), by contract                  196, 000                        -----------
          Total---------------------------                                       ------                    -----------        481, 000

                                             Cost and financial summary

Cost of new work to June 30, 1937 ----------------- -             $14, 043. 15
Cost of maintenance to June 30, 1937----------------------------- -------
      Total cost of permanent work to June 30, 1937--------------                                                           14, 043. 15
Minus accounts payable June 30, 1937-----------------------___                                                               1, 433. 43

     Net total expenditures__--------------------------------        --                                                     12, 609. 72
Unexpended balance June 30, 1937----------        --------  --------                                                         2, 390. 28

          Total amount appropriated to June 30, 1937-----------------                                                       15, 000. 00

          Fiscal year ending June 30                       1933               1934                  1395          1936          1937

Cost of new work---------....      ---------           ------------------------------------------                             $14, 043. 15
Cost of maintenance             ......------------                       -------- --                                      .
                                                                                                              ------------------------
                                                                                                             .....----------
Total expended..-- ---------------                   -------------              ---..------                  ------------      12, 609.72

Allotted------------------------------------------------------                                                                 15, 000. 00

Amount allotted from War Department Appropriation Act, ap-
  proved May 15, 1936--------------------------------------                                                              $15, 000.00
Gross amount expended----------------------------------------                                                             12, 609. 72
      Balance unexpended June 30, 1937----------------                                                                       2, 390. 28
Outstanding liabilities June 30, 1937-----------------------------
                                     ..                                                                                      1, 433. 43
          Balance available June 30, 1937---------------------------                                                           956. 85
Amount (estimated) required to be appropriated for completion
of existing project 1 2__                                        2, 169, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939,1 for new work--------------------------------------       481, 000. 00
   1 Exclusive of available funds.
   2Exclusive of $389,000 to be contributed.

                   3. POTOMAC RIVER BELOW WASHINGTON, D. C.

  Location.-The Potomac River is formed 21 miles below Cumber-
land, Md., and flows southeasterly to the Chesapeake Bay, about 80
miles from the Atlantic Ocean. (See U. S. Coast and Geodetic Sur-
vey Charts Nos. 557, 558, 559, and 560.)
  Existing project.-This provides for securing by dredging a chan-
nel 24 feet deep at mean low water and 200 feet wide between the
mouth of the river and Washington, D. C., a distance of 108 miles.
            RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                                393
The tidal ranges are: Mean, 1.3 feet at the mouth, 3 feet at Washing-
ton; extreme, 2 feet at the mouth, 4.5 feet at Washington; irregular,
2.4 feet at the mouth, 7.5 feet at Washington.
   The estimate of cost for new work made in 1891 was $158,400. The
latest (1928) approved estimate for annual cost of maintenance is
$20,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1899 (H. Doc. No. 33, 52d Cong., 1st sess.). The latest
published map is in the Annual Report for 1902, page 1038, and in
House Document No. 859, Sixtieth Congress, first session.
   Terminal facilities.-In general, the improvement is a main river
channel, so that terminal facilities are only served where the channel
runs close to either bank of the river. In all, 23 wharves are thus
served. These wharves are of open and solid fill construction and
bulkhead type. The facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
dredge Talcott was engaged from September 17. 1936, to January 21,
1937, in dredging Smith Point, Mattawoman, and Marshall Hall Bars,
depositing a total of 1,189,505 cubic yards on the adjacent flats at a
cost of $78,010.62. The U. S. derrick boat Benning was engaged from
September 4 to 11, 1936, removing two snags at a cost of $452.33. The
U. S. derrick boat Atlas was engaged from May 26 to June 1, 1937,
in removing 30 snags and trees at a cost of $1,887.67, and from Feb-
ruary 9 to 14, 1937, removing 4,302 cubic yards of material from
shoals in Coan River, Va., under section 3 of the River and Harbor
Act of July 3, 1930, at a cost of $1,000. The costs for the year were
$81,350.62, all applied to maintenance and the expenditures were
$81,558.33.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1905 at a saving of $4,564 under the estimated cost. The
controlling depths are as follows:

                                    Name of barName of bar                                Controlling
                                                                                            depth                Date


                                                                                             Feet
Naval Magazine..................-------------------------------------------------.              24. 7 June 1937.
Marshall Hall           .............----------------------------------------------------       24. 8           Do.
Mattawoman ..                                                                                    4. 6 December 1936.
                                                                                                2----------------------------------------------------
Upper Smith Point......................------------------------------------------------24.          5 October 1936.
Lower Smith Point-Maryland Point...............---------------------------------                24. 0 March 1936.
Kettle Bottom---       ------------------- ------------------------------                       24. 0 March 1935.



  The costs were $153,836 for new work and $434,098.17 for main-
tenance, which includes $1,000 for Little Wicomico River, Va., $1,000
for Herring Creek, Md., and $1,000 for Coan River, Va., a total of
$587,934.17. The total expenditures were $587,688.20.
  Proposed operations.-The balance unexpended on July 1, 1937,
$6,472.04, will be applied as follows:
Accounts payable July 1, 1937_____________________________ ____   $245. 97
Maintenance : Removing snags (July-August 1937)-----------------6, 226.07
         Total-            -- _______--
                                    --                         _________              -                 _        6, 472.04
394            ' REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  No funds can be expended profitably during the fiscal year 1939,
as it is not believed that maintenance will be necessary.
                                     Cost and financial summary

Cost of new work to June 30, 1937     __________________________' $153, 836. 00
Cost of maintenance to June 30, 1937___________________________    434, 098. 17
      Total cost of permanent work to June 30, 1937______________                                      587, 934. 17
Minus accounts payable June 30, 1937___________________________                                             245.97

     Net total expenditures___ _____________________ -                                                 587, 688. 20
Unexpended balance June 30, 1937_________________________                                                6,472.04

            Total amount appropriated to June 30, 1937 _____________                                   594, 160. 24


            Fiscal year ending June 30                     1933    1934          1935          1936            1937


C ost ofnew w ork........ .................................................................
Cost of maintenance-- ----------- ------.------------ $1, 000. 00 $1, 000. 00 $51, 366. 79    350. 62
                                                                                           $81,
Total expended--------------------- ------------                  1, 000. 00    1, 000. 00   50, 913. 11      81,558. 33

Allotted--------------------             -------------------      1, 000. 00   92, 000. 00   39, 000. 00       8,943.48


Balance unexpended July 1, 1936_         ____ ____    _________                                        $79, 086. 89
Amount allotted from War Department Appropriation
  Act approved Apr. 9, 1935--------------------------$6, 443.48
Amount allotted from War Department Appropriation
  Act approved May 15, 1936--_____________________     9,000. 00
                                                                                                           15, 443.48
     Amount to be accounted for__ ___________________--___-__                                              94, 530. 37
Deductions on account of revocation of allotment_______-________                                            6, 500. 00
      Net amount to be accounted for ________________________-                                             88, 030. 37
Gross amount expended             -
                                _______-- -     -     -     -                                              81, 558. 33
      Balance unexpended June 30, 1937_______--__                 -                                        6, 472.04
                                                                                                           6-------
Outstanding liabilities June 30, 1937 -------------------------------                                         245. 97

            Balance available June 30, 1937___----                --------------------                      6, 226.07
                               4. MONROE BAY AND CREEK, VA.

   Location.--Located in Westmoreland County, Va., 75 miles in a
southerly direction from Washington, D. C., Monroe Bay is a slight
indentation on the right bank of the Potomac River. Monroe Creek
is a tidal stream 5 miles in length and discharges into Monroe Bay.
 (See U. S. Coast and Geodetic Survey Chart No. 558.)
   Existing project.-This provides for a channel 100 feet wide, 8 feet
deep, and 950 feet long, through the bar at the entrance, and within
the creek a channel 100 feet wide and 7 feet deep and 2,500 feet
long, with turning and anchorage basin 500 feet in width at the
upper end in the vicinity of the Colonial Beach waterworks. The
plane of reference is mean low water. The mean tidal range is
1.6 feet, with winds causing variations of 2 to 3 feet.
   The estimate of cost of new work made in 1928 was $15,200. The
latest (1928) approved estimate for annual cost of maintenance is
$700.
       RIVERS AND HIARBORS--WASHINGTON,            D. C., DISTRICT           395
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 172, 70th Cong., 1st sess.). The latest
published map is in the project document.
    Terminal facilities.-There are 11 small wharves and landings in
the creek, all of which are privately owned and open to the public
by special arrangements. None of the wharves have terminal or
transfer facilities, and the structures are considered inadequate for
present and future needs.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931, at a saving of $2,740 under the estimated cost. A total
of 110,736 cubic yards of material has been dredged from the chan-
nels. The controlling depth in November 1936 was 8.4 feet at mean
low water at the entrance channel and 6.0 feet within the creek. The
total cost and expenditure under the existing project was $12,460.07,
all for new work.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938. The sum of $6,000 can be profitably
expended during the fiscal year 1939 in maintenance dredging on
inner channel and basin by contract during July 1938.
                        Cost and financial summary

Cost of new work to June 30, 1937------------------------------
Cost of maintenance to June 30, 1937---------
                                                                     $12, 460. 07

      Total cost of permanent work to June 30, 1937------------       12, 460. 07
Net total expenditures                                        _       12, 460. 07
                                                                      1------------------------------
Total amount appropriated to Jane 30, 1937-_                          12, 460. 07
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance-6-------------------------------------,        000. 00

                          5. NEALE SOUND, MD.

   Location.-Neale Sound is a tidal estuary of the Wicomico River,
Charles County, Md., situated near the junction of the Potomac and
Wicomico Rivers, 38 miles upstream of Chesapeake Bay. It ex-
tends in a southeasterly direction parallel with the Potomac River,
from which it is separated by Cobb Island and a marshy, barrier
shore which is breached in a number of places. (See U. S. Coast
and Geodetic Survey Chart No. 558.)
   Existing project.-This provides for a channel 7 feet deep and
100 feet wide through the lower entrance and a second channel 6
feet deep at the upper entrance extending from deep water within
the sound through the marshy barrier at the head of Cobb Island
to deep water in the Potomac, with widths of 60 feet within the
sound and 80 feet elsewhere. The plane of reference is mean low
water. The mean tidal range is 1.9 feet, with variations of 1 to 3
feet caused by winds.
   The estimate of cost for new work made in 1937, is $15,600, exclu-
sive of $1,000 to be contributed by local interests. The latest (1937)
approved estimate for annual cost of maintenance is $1,100.
   The existing project was adopted by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 159, 75th Cong., 1st sess.). The
latest published map is in the project document.
396          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-The approved project provides that local in-
terests shall contribute $1,000 toward the cost of the work, furnish
free of cost to the United States necessary rights-of-way and suitable
spoil-disposal areas for new work and for subsequent maintenance
as required, release the United States and its agents from all dam-
ages to oyster grounds attributable to the work of improvement, and
agree to provide a satisfactory wharf open to the public on equal
terms. It is expected that these requirements will be met when funds
become available.
   Terminal facilities.-Two publicly owned wharves, 32 small pri-
vately owned wharves and stages, and 1 small marine railway are
located on the waterway. The terminal facilities are considered
adequate for present commerce. One additional wharf open to the
public should be provided on Neale Sound to meet the requirements
of prospective seafood commerce when the waterway is improved
under the adopted project.
   Operation and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
project. The controlling depths in July 1936 were 6 feet for a width
of 60 feet at the lower entrance and one-half foot for a width of
60 feet at the upper entrance.
   Proposed operations.-None. No funds are available.
   The sum of $16,600, including $1,000 to be contributed by local
interests, can be profitably expended for new work during the fiscal
year 1939 in dredging channels to project dimensions under contract
in October 1938.
                                   Cost and financial summary

Amount (estimated)       required to be appropriated for completion of
existing project 1- - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -
                                                                                                - - -
                                                                                                      $15, 600
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for new work 1------                 -----------                                        15, 600
   1Exclusive of $1,000 to be contributed by local interests.

                                       6. COAN RIVER, VA.

   Location.-Coan River is a tidal estuary in Northumberland
County, Va. It enters the right bank of the Potomac River 8 miles
upstream from the junction of the latter with Chesapeake Bay.
(See U. S. Coast and Geodetic Survey Chart No. 557.)
   Emisting project.-This provides for a channel 14 feet deep and
150 feet wide, suitably widened at the bend, from the mouth to
Cowarts, with a turning basin at the latter point 14 feet deep, 400
feet wide and 600 feet long. The plane of reference is mean low
water. The mean tidal range is 1.4 feet with winds causing varia-
tions of 1 to 3 feet.
   The estimate of cost of new work made in 1937 is $54,000. The
latest (1937) approved estimate for annual cost of maintenance is
$2,500.
   The existing project was adopted by the River and Harbor Act ap-
proved August 26, 1937. (Rivers and Harbors Committee, Doc. No.
30, 75th Cong., 1st sess.) The latest published maps are in this
document.
   Local cooperation.-The approved project provides that local in-
terests shall construct a suitable terminal at Cowarts, improve the
road from Cowarts to the Callao-Lewisetta road, agree to protect
       RIVERS AND HARBORS--WASHINGTON, D. C., DISTRICT                397
the United States and its contractors against claims for damages to
oyster grounds during the initial dredging and future maintenance,
and furnish without cost to the United States suitable areas for the
disposal of dredged material. Local interests have promised to
comply with these stipulations.
   Terminal facilities.-Ten privately owned and four publicly owned
wharves, open to the public on equal terms, and one marine railway
are located on Coan River and its branches. These terminals are con-
sidered adequate for present commerce. Any substantial increase in
commerce resulting from the improvement under the existing project
would necessitate additional terminal facilities, for which adequate
frontage is available and for which provision is made in the require-
ments of local cooperation.
   Operations and results during fiscal year.-No work was done
under the project. Under the provisions of section 3 of the River
and Harbor Act of July 3, 1930, 4,302 cubic yards of material were
removed from shoals in the vicinity of Lake Wharf and Bundicks
upstream of the project limits, by Government plant at a total cost
and expenditure of $1,000 under an allotment to the project, "Poto-
mac River below Washington, D. C."
   Condition at end of fiscal year.-No work has been done under the
project. The controlling depth in the area covered by the project was
11 feet in November 1936. Under the provisions of section 3 of the
River and Harbor Act of July 3, 1930, shoals have been removed
upstream of the present project at a total cost and expenditure of
$1,000, and is reported under the improvement, "Potomac River
below Washington, D. C."
  Proposed operations.-No funds are available.
  The sum of $54,000 can be profitably expended during the fiscal
year 1939 for dredging channels to project dimensions by contract
from March to June 1939.
                        Cost and financial summary

Amount (estimated) required to be appropriated for completion of
existing project---------------------      --------------------- $54, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work------------------     -------------------- 54, 000
                    7. LITTLE WICOMICO RIVER, VA.

   Location.-Little Wicomico River is a tidal estuary 6 miles in
length lying in Northumberland County, Va., flowing in a south-
easterly direction to the Potomac River, which it enters on the right
bank one-half mile upstream of its mouth. (See U. S. Coast and
Geodetic Survey Chart No. 557.)
   Existing project.-This provides for a channel 8 feet deep at mean
low water and 150 feet wide, extending from deep water in the Poto-
mac River to deep water in Little Wicomico River, for two stone jet-
ties extending to the 8-foot contour in the Potomac River, and for
bulkhead walls from the inner ends thereof extending sufficiently into
Little Wicomico River to stabilize the dredged inner channel. The
mean tidal range is 1.2 feet in the Potomac River at the entrance and
before improvement 0.5 foot within the river, with winds causing
variations of 2 to 3 feet.
398       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimate of cost for new work, made in 1935, is $75,000, includ-
ing $5,000 contributed by local interests. The latest (1935) approved
estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935. (Rivers and Harbors Committee Doc. No. 24, 74th
Cong., 1st sess.) The latest published map is in the project docu-
ment.
   Local cooperation.-The approved project provides that local in-
terests shall contribute $5,000 toward the first cost, provide necessary
spoil-disposal areas, and release the United States and its agents
from all claims for damages resulting from the dredging or construc-
tion work. The cooperation was complied with and approved August
1, 1936.
   Terminal facilities.-There are numerous small wharves and stag-
ings for private use, an oyster-shucking and packing plant, and a
marine railway and boat-building yard. These facilities are con-
sidered adequate for present commerce.
   Operations and results during fiscal year.-Construction of jetties
and bulkheads by contract was in progress from October 18, 1936,
to April 30, 1937. A total of 8,280 tons of stone was placed in the
jetties and 1,007 linear feet of timber bulkhead were completed. The
costs for the year were $53,774.90 and the expenditures were $38,-
776.24, all applied to new work.
   In addition the costs and expenditures from contributed funds
were $5,000 for new work.
   Condition at end of fiscal year.-The project was 70 percent com-
pleted June 30, 1937. The controlling depth was 2.5 feet mean low
water in April 1937 for a width of 80 feet. The costs were $53,774.90
United States funds and $5,000 contributed funds for new work and
the expenditures were $38,776.24 United States funds and $5,000 con-
tributed funds.
   Proposed operations.-The balance unexpended on July 1, 1937,
$31,223.76, and anticipated allotment of $8,000 will be applied as
follows:
Accounts payable July 1, 1937..----------------------------------     $14, 998. 66
Payment of deferred costs on construction of jetties-----------------      500. 00
New work: Dredging from the channels with Government plant,
  165,000 cubic yards (July-September 1937) --------------------- 23, 725. 10
       Total_---   ----------------------- ------------------------        39, 223. 76
  The sum of $8,000 can be profitably expended during the fiscal year
1939 in maintenance work on the stone jetties by contract in August
1938.
                           Cost and financial summary

Cost of new work to June 30, 1937------------------------------        $53, 774. 90
Cost of maintenance to June 30, 1937    __________________

      Total cost of permanent work to June 30, 1937                         3, 774.90
                                                                           5-------------
Minus accounts payable. June 30, 1937 ---                                      998. 66
                                                                           1-------------------------_4,

     Net total expenditures    ___________________________             138, 776. 24
Unexpended balance June 30, 1937___-----------------------------           31, 223. 76
      Total amount appropriated to June 30, 1937--------------         1   70, 000. 00
  1In addition, $5,000 was expended from contributed funds.
           RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                     399

        Fiscal year ending June 30                     1933         1934         1935        1936           1937


Cost of new work         ------------------------ ------------ -------   ------------ $53,774.90
Cost of maintenance ----- -    -       ......... ,.-- .. .. ------------ ----------
                                                                          .         .                       -------
Total expended---------------------        --    ---          ------------   ------------ -----------      38,776.24
           ---------------------------------...........
Allotted-----                                                                                $70,000


Balance unexpended July 1, 1936        ______________           __                                  $70, 000. 00
Gross amount expended ----------------          _____ $43, 776. 24
Less reimbursements collected_________________-__-      5,000. 00
                                                                                                        38, 776. 24
      Balance unexpended June 30, 1937----      ______________-                                         31, 223. 76
Outstanding liabilities June 30, 1937----------             $302. 81
Amount covered by uncompleted contracts --------- __      15, 195. 85
                                                                                                        15, 498, 66

         Balance available June 30, 1937----------------------                                          15, 725. 10
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance 2                  ____                                                     8,000. 00
   2Exclusive of available funds.

                                 8. ST. JEROMES CREEK, MD.

   Location.-St. Jeromes Creek is a tidal estuary in St. Marys
County, Md., on the western shore of the Chesapeake Bay, 6 miles
north of Point Lookout, at the mouth of the Potomac River. (See
U. S. Coast and Geodetic Survey Chart No. 557.)
  Previous project.-The original project for improvement was
adopted by the River and Harbor Act of March 3, 1881. The total
costs and expenditures were $26,500. For further details see Annual
Report for 1890, page 114.
   Existing project.-This provides for a channel 100 feet wide and
7 feet deep from Chesapeake Bay to the vicinity of Airedele, thence
60 feet wide to deep water in the creek, with a turning basin of the
same depth 200 feet wide and 300 feet long opposite Airedele. The
plane of reference is mean low water. The mean range of tide is 1.3
feet, with variations due to winds of 1 to 3 feet.
   The estimate of cost for new work made in 1937 is $19,500. The
latest (1937) approved estimate for annual cost of maintenance is
$1,600.
   The existing project was adopted by the River and Harbor Act
of August 26, 1937. (H. Doc. 174, 75th Cong., 1st sess.) The latest
published map is in the project document.
   Local cooperation.-The approved project provides that local in-
terests shall furnish free of cost to the United States suitable spoil-
disposal areas for new work and for subsequent maintenance as
required and release the United States and its agents from any
claims for damages attributable to the work of improvement.
   Terminal facilities.-One substantial wharf open to the public is
located at Airedele near the entrance. There are no other commercial
wharves on the waterway, but a number of small wharves serve
individual boat operators. It is considered that the present terminal
facilities are adequate for present and prospective commerce.
       20196-37-pt. 1-26
400       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Operations and results during fscal year.-None.
  Condition at end of fiscal year.-Under the previous project the
entrance channel across the bay shore was partially completed in 1886.
No work has been done on the existing project. The controlling
depth in May 1936 was 31/2 feet in the area covered by the existing
project.
  Proposed operations.-None. No funds are available.
  The sum of $19,500 can be profitably expended for new work in
completion of the project, by contract, during September and October
1938.
                        Cost and financial summary

Cost of new work to June 30, 1937------------------------------      $26, 500
Cost of maintenance to June 30, 1937_----111111111111111        1--_ -------

      Total cost of permanent work to June 30, 1937__---------------   26, 500
Net total expenditures----------------------------------------26,          500
Total amount appropriated to June 30, 1937 ------------------------    26, 500
Amount (estimated) required to be appropriated for completion of ex-
isting project-------     --------------------------------------      19, 500
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work------         ------------------- ---------------- 19, 500

                     9. RAPPAHANNOCK RIVER, VA.

   Location.-Rises in Virginia, in the Blue Ridge Mountains, and
flows southeasterly about 212 miles to Chesapeake Bay, which it en-
ters about 40 miles north of Old Point Comfort. (See U. S. Coast
and Geodetic Survey Charts Nos. 534, 535, 536.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871, and modified in 1879. The cost and expenditures
to 1905 were $310,645.83, of which $197,145.83 was for new work and
$113,500 for maintenance. For further details see page 1793 of
Annual Report for 1915.
   Existing project.-This provides for securing a channel 12 feet
deep and 200 feet wide between the mouth and Port Royal and 12 feet
deep and 100 feet wide between Port Royal and Fredericksburg by
dredging and the construction of 20,401 feet of crib and pile dikes
and 1,906 feet of riprap-stone dikes, the latter being also designed to
retain the excavated material deposited behind them. The length of
section included in the project is 107 miles. The plane of reference
is mean low water. The tidal ranges are: Mean, 2.8 feet at Fred-
ericksburg, 1.6 feet at Tappahannock; extreme, 3.5 feet at Fredericks-
burg, 2.5 feet at Tappahannock; irregular, 6 feet at Fredericksburg,
5 feet at Tappahannock.
   The estimate of cost for new work made in 1905 was $171,000, ex-
clusive of amount expended on previous project. The latest (1926)
approved estimate for annual cost of maintenance is $22,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1905 (Annual Report for 1906, pp. 1110-1113). The
latest published map is in the Annual Report for 1910, page 1364.
   Terminal facilities.-In the section under improvement, extending
from Fredericksburg, Va., to Tappahannock, Va., a distance of 65
       RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                             401
miles, there are 24 wharves, of which 9 are solid bulkhead type and
15 are open pile structures. From Tappahannock to the mouth there
are 16 open pile wharves. The terminals are considered adequate
for the existing commerce.
   Operations and results during fiscal year.-Dredging in progress
during the previous fiscal year, under contract, was completed in the
period July 1 to July 11, 1936. A total of 14,357 cubic yards were
dredged from Upper Spottswood Bar and placed on adjacent deposit
areas at a cost of $3,891. U. S. hydraulic dredge Talcott was en-
gaged from July 23 to August 7, 1936, in dredging Mangoright and
Nanzatico Bars; a total of 183,840 cubic yards were placed on
adjacent flats at a cost of $13,523.39. The U. S. derrick boat Atlas
was engaged from October 23, 1936, to January 5, 1937, in removing
snags and trees from the channels of the river between Hopyard Bar
and Fredericksburg, at a cost of $11,229.08. Under the provisions
of section 3 of the River and Harbor Act of July 3, 1930, the U. S.
derrick boat Atlas was engaged from September 23 to October 2, 1936,
in dredging 7,018 cubic yards from shoal at the mouth of Beach
Creek, at a cost of $1,000, and from January 11 to January 21, 1937,
in dredging 6,811 cubic yards from shoal at mouth of Queens Creek,
at a cost of $1,600, of which $600 was contributed by local interests.
The total costs for the year were $30,643.47, all applied to mainte-
nance, and the expenditures were $42,975.62 excluding $600 con-
tributed by local interests.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1910. The controlling depth May 1937 was 9.3 feet at mean
low water. The total costs and expenditures of the existing project
were $715,872.85, of which $217,487.20 was for new work and
$498,385.65 for maintenance, which includes $994.59 for Parrotts
Creek, and $1,000, each for Greenvale, Mill, and Beach Creeks, and
$1,600 for Queens Creek, Va., of which $600 was contributed by local
interests.
   Proposed operations.-An anticipated allotment of $45,000 will be
applied as follows:
Maintenance :
    Redredging nine shoals between Tappahannock and Fredericks-
      burg approximately 215,000 cubic yards, with U. S. dredge Talcott
      (July-September 1937) ---------------------------------           $44,000
    Protection of sand fills ---------------------------------    _       1, 000

           Total ---------------------------------                               45, 000
   No funds can be profitably expended during the fiscal year 1939,
as it is believed that maintenance will not be necessary.
                            Cost and financial summary

Cost of new work to June 30, 1937----------------------------            $414, 633. 03
Cost of maintenance to June 30, 1937--------------1__                    1611, 285. 65

      Total cost of permanent work to June 30, 1937 _        __   1, 025, 918. 68
Net total expenditures--     ----------------------------        11, 025, 918. 68
Total amount appropriated to June 30, 1937__----------------    _11, 025, 918. 68
  1 In addition, $600 was expended from contributed funds for maintenance.
402            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


           Fiscal year ending June 30             1933           1934          1935           1936             1937

Cost of new work ....--
Cost of maintenance---....----------------
                                       ..       $1, 434. 70   $43, 316. 36   $2, 417. 55   $54, 356. 53      $30, 643. 47
Total expended---------     ---    ----------    1, 470. 26    41, 536. 39    4, 197. 52    42, 024.38        42, 975. 62
Allotted    ------------------------------        -29. 74      44, 733. 91   33, 000. 00    61, 000. 00-


Balance unexpended July 1, 1936_----------                                                            $50, 975. 62
Deductions on account of revocation of allotment_______________-_                                       8, 000. 00

      Net amount to be accounted for------------                                                           42, 975. 62
Gross amount, expended--_______-____-____________ $45, 432. 78
Less reimbursements collected------------------------ 2, 457. 16
                                                                                                           42, 975. 62
                                    10. HOSKINS CREEK, VA.

   Location.-Hoskins Creek is a tributary on the right bank of the
Rappahannock River in Essex County, Va., 42 miles upstream from
its mouth in Chesapeake Bay and one-half mile downstream from the
town of Tappahannock, Va. (See U. S. Coast and Geodetic Survey
Chart No. 535.)
   Existing project.-This provides for a channel 8 feet deep from
that depth in the Rappahannock River to the highway bridge three-
fourths mile above the mouth of the creek, with widths of 100 feet
in the river and 60 feet within the creek and a turning basin of the
same depth 200 feet wide and 250 feet long near the head of the
channel. The plane of reference is mean low water. The mean tidal
range is 1.6 feet, with variations of 1 to 2 feet caused by winds.
   The estimate of cost of new work made in 1937 is $15,700, exclusive
of $500 to be contributed by local interests. The latest (1937) ap-
proved estimate for annual cost of maintenance is $1,500.
   The existing project was adopted by the River and Harbor Act
of August 26, 1937 (Rivers and Harbors Committee Doc. No. 8, 75th
Cong., 1st sess.). The latest published map is in the project document.
   Local cooperation.-The approved project provides that local in-
terests shall contribute $500 toward the initial cost of the improve-
ment, provide and maintain adequate public terminals open to all on
equal terms, and furnish free of cost to the United States suitable
spoil-disposal areas for new work and for subsequent maintenance as
required. It is expected that these requirements will be met when
funds become available.
   Terminal facilities.-A bulkhead landing and a small wharf serve
present navigation adequately. Two bulkhead landings open to the
public, in addition to new privately owned terminals, would be
required to serve prospective navigation.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
project. The controlling depth in May 1936 was 21/2 feet at the
entrance to the creek.
   Proposed operations.-None. No funds are available.
   The sum of $16,200, including $500 to be contributed, can be ex-
pended profitably for new work during the fiscal year 1939 in dredg-
ing channels to project dimensions by contract in September 1938.
         RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                     403
                              Cost and financial summary
Amount (estimated) required to be appropriated for completion of
existing project _______              _________--______ _              1$15,   700
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work_                        _
                               __________________ __                     115, 700
  1 Exclusive of $500 to be contributed by local interests.

                             11. TOTUSKEY CREEK, VA.

   Location.-Totuskey Creek, located in Richmond County, Va., flows
in a southerly direction about 15 miles to the Rappahannock River
which it enters on the left bank about 35 miles upstream of its mouth.
 (See U. S. Coast and Geodetic Survey Chart No. 535.)
   Previous projects.-After a survey and examination authorized by
the River and Harbor Act of June 23, 1874, appropriations of $2,500,
$2,500, and $5,000 were made by River and Harbor Acts of June 14,
1880, March 3, 1881, and August 2. 1882, respectively. This total
 ($10,000) was expended in construction of 2,117 lineal feet of longi-
tudinal timber dike at Booker Bar, 4 miles above the mouth.
   Existing project.-This provides for a channel 8 feet deep at mean
low water, 150 feet wide through the bar at the mouth, and 80 feet
wide upstream to Totuskey Bridge, a distance of about 41/ miles, and
the repair of dike at Booker Bar constructed under the previous proj-
ect. The mean tidal range is 1.6 feet at the mouth and 2 feet at
Totuskey Bridge, with winds causing variations of 2 to 3 feet.
   The estimate of cost for new work made in 1931 was $36,000, exclu-
sive of amount expended on previous projects, but including $1,000
contributed by local interests. The latest (1935) approved estimate
for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. No. 183, 72d Cong., 1st sess.). The latest
published maps are in the project document.
   Local cooperation.-The approved project provides that local inter-
ests shall furnish free of cost to the United States necessary spoil-
4isposal areas within 1,200 feet of the channel and contribute $1,000
to the cost of the work. The cooperation was complied with and
approved September 21, 1936.
   Terminal facilities.-There are 2 county-owned wharves and 12
privately owned shore landings. Terminal facilities are considered
adequate for existing and future commerce.
   Operations and results during fiscal year.-Dredging by contract
was in progress from December 28, 1936, to February 12, 1937. A
total of 254,700 cubic yards was placed on adjacent deposit areas at a
cost of $26,706.88. The U. S. derrickboat Atlas was engaged from
October 5 to October 20, 1936, in dredging 3,629 cubic yards from a
small shoal near Totuskey Bridge and removing 170 snags and trees
at a total cost of $594.77, and repairing 1,550 linear feet of dike at a
cost of $1,346.81. The total costs and expenditures for the year, in-
cluding $1,000 contributed by local interests, were $28,648.46, all
applied to new work.
   Condition at end of fiscal year.-The project was completed in 1937
at a saving of $7,352 under the estimated cost. The controlling depth
February 1937 was 8.4 feet at mean low water. The total costs and
404             REPORT OF CHIEF OF ENGINEERS, U. S, ARMY, 1937

expenditures under the existing project were $28,648.46, including
$1,000 contributed by local interests.
  Proposed operations.-The balance unexpended July 1, 1937, $2,-
351.54, is not required for maintenance and is available for revocation.
  No additional funds can be profitably expended during the fiscal
year 1939, as it is believed that maintenance will not be required.
                                                Cost and financial summary

Cost of new work to June 30, 1937--------------------------                                           $37, 648. 46
Cost of maintenance to June 30, 1937_______

           Total cost of permanent work to June 30, 1937--------------                                 37, 648. 46
Net total expenditures________________
Unexpended balance June 30, 1937___- ______-___-_--
                                                                 ______-               -______-
                                                                                                      137, 648. 46
                                                                                                        2, 351. 54
          Total amount appropriated to June 30, 1937__------------                                    140, 000. 00

          Fiscal year ending June 30                     1933     1934          1935          1936          1937


Cost of new work.......------------------                                                               1 $27, 648. 46
Cost of maintenance ...        ..           _
Total expended---------------------------------------------------------................-----.......       27, 648.46
Allotted ..................--------------------------------------------------------------------           30, 000. 00


Amount allotted from War Department Appropriation Act approved
  May 15, 1936----------------                                        $30, 000. 0t
Gross amount expended ____________________    ______ $28, 648.46
Less reimbursements collected                           , 000. 00
                                                       1-------------------------
                                                                       27, 648.46
           Balance unexpended June 30, 1937----------------------------                                 2, 351. 54
     In addition $1,000 was expended from contributed funds for new work.

                                            12. MULBERRY CREEK, VA.

   Loation.-The creek is a tidal estuary about 21/2 miles in length ii
Lancaster County, Va., entering the left bank of the Rappahannock
River, 26 miles upstream of its mouth. (See U. S. Coast and Geodetic
Survey Chart No. 535.)
   Existing project.-This provides for a channel 6 feet deep and 100
feet wide at mean low water and 900 feet long through the bar at the
mouth of the creek. The tidal ranges are: Mean, 1.7 feet; extreme,
2.6 feet; and irregular, 4.5 feet.
   The estimate of cost of new work, made in 1924, was $2,500. There
is no approved estimate for annual cost of maintenance.
   The existing project was adopted by the River and Harbor Act of
January 21, 1927 (H. Doec. No. 482, 68th Cong., 2d sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are two private oyster-shucking
wharves, one cannery, and one oystershell grinding plant, all near the
mouth of the creek, and four shore landings farther upstream, all open
to the public. The existing facilities are considered adequate.
   Operations and results during fiscal year.-None.
        RIVERS AND HARBORS-WASHINGTON,                D. C., DISTRICT        405
   Condition at end of fiscal year.-The existing project was com-
pleted in 1928. The channel is in good condition, the controlling
depth in April 1935 being 5.5 feet at mean low water. The total cost
under the existing project was $2,500, of which $2,392.60 was for new
work and $107.40 was for maintenance. The total expenditure was
$2,500.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
  The sum of $5,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging on channel across bar at mouth.
                         Cost and financial summary
Cost of new work to June 30, 1937-------------------------------        $2, 392. 60
Cost of maintenance to June 30, 1937-------------------------------         107. 40

      Total cost of permanent work to June 30, 1937----------------     2, 500. 00
Net total expenditures__________----                                    2, 500. 00
Total amount appropriated to June 30, 1937-------- ---------------      2, 500. 00

Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance_______-------------                              5, 000. 00

                         13. URBANNA CREEK, VA.

   Location.-Urbanna Creek rises in Virginia, flows in an easterly
direction about 5 miles to the Rappahannock River, which it enters
about 15 miles above its mouth. (See U. S. Coast and Geodetic
Survey Chart No. 535.)
   Existing project.-This provides for dredging a channel 150 feet
wide and 10 feet deep, at mean low water, nine-tenths of a mile
through the outer and inner bars, with a turning basin of the same
depth at the head of steamboat navigation, and for jetties to protect
the channel through the outer bar. The jetties are 2,612 feet long-
one of riprap, 1,895 feet long, and one of timber, 717 feet long. The
tidal ranges are: Mean, 1.5 feet; extreme, 2.5' feet; irregular, 4.5 feet.
   The estimate of cost for new work, revised in 1897, was $70,000.
The latest (1917) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1879 (Annual Report for 1875, vol. 2, p. 139). It was
modified in 1883, 1888, and, 1897. The latest published map is in
the Annual Report for 1890, page 1070.
   Terminal facilities.-This waterway has 11 improved wharves of
open-pile construction, and a marine railway. There are several shore
landings intermittently used by craft for embarking lumber, and there
are several small wharves used for private purposes and of no com-
mercial importance. These facilities are considered adequate for the
existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1914 at a saving of $31,188 under the estimated cost. The
jetties were completed in 1913 and the dredging in 1914. The stone
jetty is in good condition; the timber dike has been partially de-
stroyed. The controlling depth in June 1937 was 9.3 feet at mean
406       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 137

low water. The costs and expenditures were $38,811.77 for new work
and $42,930.39 for maintenance, a total of $81,742.16.
  Proposed operations.-An anticipated allotment of $6,000 will be
applied to removal of shoals in entrance to the creek, dredging ap-
proximately 40,000 cubic yards, by contract, in September 1937.
   No funds can be profitably expended during the fiscal year 1939,
as it is believed that maintenance will not be necessary.
                          Cost and financial summary

Cost of new work to June 30, 1937___-------------------------------   $38, 811.77
Cost of maintenance to June 30, 1937-----------------------------      42, 930. 39

      Total cost of permanent work to June 30, 1937--------------      81, 742. 16
Net total expenditures-----------------------------------------        81, 742. 16
Total amount appropriated to June 30, 1937----------------------       81, 742. 16

                          14. CARTERS CREEK, VA.

   Location.-The creek is a small tidal estuary with three prongs
in Lancaster County, Va., entering the Rappahannock River on the
left bank 10 miles upstream of the mouth. The creek is 66 miles
northerly from Norfolk, Va. (see U. S. Coast and Geodetic Survey
Chart No. 534).
   Existing project.-This provides for an entrance channel 15 feet
deep, 200 feet wide, and about 2,200 feet long across the entrance
bar; a channel in Eastern Branch at Gallyhook Point 12 feet deep,
100 feet wide, and 1,100 feet long; and in Carters Cove a channel
12 feet deep, 100 feet wide, and 1,700 feet long to the Humphreys
Marine Railways, Inc.; and for a jetty on the downstream side of
the entrance channel. The plane of reference is mean low water.
The mean tidal range is 1.4 feet, with winds causing variations of
2 to 3 feet.
   The estimate of cost for new work, revised in 1930, is $36,450,
exclusive of $4,000 to be contributed by local interests. The latest
 (1930) approved estimate for annual cost of maintenance of the,
channel in Carters Cove is $1,000. There is no approved estimate
of maintenance for the other portions of the project.
   The existing project was adopted by the following River and Har-
bor Acts: The act of June 13, 1902, provided for all features of the
project except the channel in Carters Cove (H. Doc. No. 185, 56th.
Cong., 1st sess.), and the act of July 3, 1930, provided for the Car-
ters Cove channel (H. Doc. No. 518, 70th Cong., 2d sess.). The
latest published map is in the last-named document.
   Local cooperation.-Modificationof the project covering the chan-
nel in Carters Cove provides that local interests shall contribute
 $4,000 for the cost of the work. This condition has not been com-
plied with, and compliance is not expected in the near future.
    Terminal facilities.-There are 11 wharves on the creek, all of
timber construction. All of the wharves are privately owned and
open to the public by special arrangement. The existing wharf
facilities are considered adequate.
    Operations and results during fiscal year.-Under the provisions
of section 3 of the River and Harbor Act of July 3, 1930, the U. S.
derrickboat Atlas was engaged from January 25 to February 7, 1937,
in dredging a shoal in Carters Cove. A total of 5,979 cubic yards
            RIVERS AND HARBORS-WASHINGTON,                                                   D. C., DISTRICT         407
was placed on adjacent deposit areas at a cost of $1,700, of which
$700 was contributed by local interests. The costs and expenditures
for the year were $1,700, all applied to maintenance.
   Condition at the end of fiscal year.-The entrance channel, Gally-
hook Point Channel in eastern branch, and jetty were completed in
1908. Work has not been commenced on the new channel in Carters
Cove, authorized by the River and Harbor Act of July 3, 1930. The
project is 73 percent completed. A total of 65,893 cubic yards of
material was dredged from the channels and 1,507 cubic yards of
stone was deposited in 742 linear feet of jetty. The channels com-
pleted are in good condition; the controlling depths at mean low
water in April 1935 were 15.7 feet in the entrance channel, 14.2 feet
in the Gallyhook channel, and 10.4 feet in Carters Cove.
   The total costs and expenditures under the existing project were
$31,288.48, of which $28,397.55 was for new work and $2,890.93 was
for maintenance, including $1,700 for Carters Cove, under provisions
of section 3 of the River and Harbor Act of July 3, 1930, of which
$700 was contributed by local interests.
   Proposed operations. No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939, as it is believed that
maintenance will not be necessary.
   Funds for new work are not requested, due to the nonfulfillment
of the conditions of local cooperation.
                                              Cost and financial summary

Cost of new work to June 30, 1937__-_------__--------       ____   $28, 397. 55
Cost of maintenance to June 30, 1937 -----------------------------   2, 190. 93

      Total cost of permanent work to June 30, 1937 ______________ 30, 588. 48
Net total expenditures -----------------------------------------   130, 588. 48
Total amount appropriated to June 30, 1937 .---                    130,588.48


         Fiscal year ending June 30                                1933               1934    1935        1936      1937


Cost of new work..-..-----------------                            -     -----------------------------------         ------
C ost of m ainten ance--------- -------------                                  - . . ------------ - -
                                                               . . . . .. . . ..                      ----------     $1, 000
Total expended-----------------------------------                                                                      1,000
Allotted--        ---------------------------------------------------------------------                                1,000


Amount allotted from War Department Appropriation                                                    Act approved
   May 15, 1936                                            -------------------                                      $1,000
Gross amount expended                                     __-------------------------------------------             1, 000
Amount (estimated) required to be appropriated for completion of exist-
               _                                                                                                    8,000
  ing project
  ing project ------------------     ------------                                                                   8, 000
   1In addition, $700 was expended from contributed funds for maintenance.
   2 In addition local interests are to contribute $4,000.

                                                    15. MILL CREEK, VA.

  Location.-The creek is a tidal estuary in Middlesex County, Va.,
entering the right bank of the Rappahannock River 8 miles upstream
of its mouth. (See U. S. Coast and Geodetic Survey Chart No. 534.)
  Existing project.-This provides for a channel 11 feet deep and
100 feet wide at mean low water, extending from deep water across
an indentation of the Rappahannock River to a turning basin 300
feet square at the new wharf in Mill Creek. The mean tidal range
is 1.3 feet, with winds causing variations of 2 to 3 feet.
408           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimate of cost for new work made in 1935 was $7,500. The
latest (1935) approved estimate for annual cost of maintenance is
$200.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 20,
74th Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-The approved project provides that local in-
terests furnish suitable soil-disposal areas on shore, construct levees
adequate to retain the dredged material, and release the United States
and its agents from all damages to oyster grounds or other proper-
ties which may result from the dredging operations. The coopera-
tion was complied with and approved February 11, 1937.
   Terminal facilities.-A first-class wharf has been constructed at
the foot of a secondary State road leading to the location of the
authorized turning basin. The facilities are considered adequate for
present and future commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
dredge Dalecarliawas engaged from March 3 to 13, 1937, in dredging
the channel and basin to the steamboat wharf. A total of 24,632
cubic yards was placed on adjacent deposit areas. The total costs
and expenditures for the year were $5,444.95, all applied to new work.
   Condition at end of fiscal year.-The project was completed in
1937 at a saving of $2,055 under the estimated cost. The control-
ling depth in June 1937 was 11.6 feet at mean low water. The total
costs and expenditures under the existing project were $5,444.95,
all for new work.
   Proposed operations.-The balance unexpended July 1, 1937,
$2,055.05, is not required for maintenance and has been reported for
revocation.
   No additional funds can be profitably expended during the fiscal
year 1939, as it is believed that maintenance will not be necessary.
                                    Cost and financial summary
Cost of new work to June 30, 1937 -------------------------------                                     $5, 444. 95
Cost of maintenance to June 30, 1937
           Total cost of permanent work to June 30, 1937-------------__                                5, 444. 95
Net total expenditures__..-________--------                                                            5, 444.95
Unexpended balance June 30, 1937__-----------------------------                                        2, 055. 05
           Total amount appropriated to June 30, 1937----------------                                  7, 500. 00

           Fiscal year ending June 30                1933         1934        1935          1936          1937


                ------------------------
Cost of new work....                                                                  ------------ $5, 444. 95
Cost of maintenance--------                      ---------------------------------- ----------------------
             ---------------
Total expended....                         ---                 -------   --   ------   ------------       5,444.95
Allotted       -----------------------------------------------------------                                7, 500. 00


Amount alloted from War Department Appropriation Act approved
              -------------------------
May 15, 1936__                                               $7. 500. 0CO
Gross amount expended___------------------      ------------   5, 444. 95
           Balance unexpended June 30, 1937---
                                          ...  _----------                                             2, 055. 05
       RIVERS AND HARBORS-WASHINGTON,                  D. C., DISTRICT      409
                          16. JACKSON CREEK, VA.

   Location.-The creek is a small tidal estuary with two prongs in
Middlesex County, Va., entering the Piankatank River on its left
bank 11/2 miles upstream of the mouth. The creek is 47 miles north-
erly from Norfolk, Va. (See U. S. Coast and Geodetic Survey Chart
No. 534.)
   Existing project.-This provides for an entrance channel 8 feet deep
at mean low water with a width of 60 feet increased to 80 feet at
the outer end following in general the existing channel. The mean
tidal range is 1.2 feet with winds causing variations of 2 to 3 feet.
    The estimate of cost for new work made in 1934 was $11,800. The
latest (1.935) approved estimate for annual cost of maintenance is $800.
    The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 41, 73d
Cong., 2d sess.). The latest published map is in the project document.
    Local cooperation.-The approved project provides that local in-
terests shall provide the necessary areas within 1,000 feet of the
proposed channel for the deposit of dredged material, including
release from damages to oyster grounds; construct within the creek
a suitable free wharf and provide a suitable road connecting it with
an improved State or county road and remove the existing parts of
the wrecked wharf which obstruct the proposed channel. The co-
operation was complied with and approved September 12, 1936.
    Terminal facilities.-The waterway has 22 small privately owned
wharves and 2 marine railways. These facilities will be adequate
upon completion of the free wharf.
    Operations and results during fiscal year.-Dredging by contract
was in progress from February 16 to March 11, 1937. A total
of 39,985 cubic yards was placed on adjacent deposit areas. The total
cost for the year was $8,800, all applied to new work, and the expendi-
tures were $8,012.29.
    Condition at end of fiscal year.-The project was completed in 1937
at a saving of $3,000 under the estimated cost. The controlling depth
in March 1937 was 8.5 feet mean low water. The total cost under
the existing project was $8,800, all for new work, and the expendi-
tures were $8,012.29.
    Proposed operations.-The balance unexpended July 1, 1937,
 $787.71, will be applied to payment of accrued costs.
    No additional funds can be profitably expended during the fiscal
year 1939, as it is believed that maintenance will not be necessary.
                           Cost and financial summary

Cost of new work to June 30, 1937-___------------ __-_________         $8, 800. 00
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937---------           - 8, 800. 00
Minus accounts payable June 30, 1937 ----     __-----------      ___        787. 71
     Net total expenditures ____----------    ----------                 8, 012.29
Unexpended balance June 30, 1937-----------------        -----              787. 71
      Total amount appropriated to June 30, 1937-------------__          8, 800. 00
410          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30                    1933            1934         1935          1936        1937


Cost of new work- .... .        -- _-_-....
                                       -      -        -      -........-.
                                                                     --.            .....       -..
                                                                                                 ....        $8, 800. 00
Cost of maintenance....----------           -                                                  ---                _ _-----------
Total expended.....---------            ------------          -------------------           ------------      8, 012. 29

Allotted..-----------          --------..                  -----------------------------------                8,800.00


Amount allotted from War Department Appropriation Act approved
  May 15, 1936------------------------------------------------ $10, 500. 00
Deductions on account of revocation of allotment___                , 700. 00
                                                                 1_________

      Net amount to be accounted for ____________------------                                              8, 800. 00
Gross amount expended------------------------------------------                                            8, 012. 29

    Balance unexpended June 30, 1937--------------------------                                               787. 71
Amount covered by uncompleted contracts ------------------------                                             787. 71

                                    17. MILFORD HAVEN, VA.

   Location.-Milford Haven in Mathews County, Va., is a tidal estu-
ary or strait on the western shore of Chesapeake Bay, about 35 miles
north of Old Point Comfort. It lies between Gwynns Island and
the main shore at the mouth of the Piankatank River.,
   Existing project.-This provides for dredging a channel 10 feet
deep at mean low water, with a minimum width of 200 feet, through
the bars at the northwest entrance and between Cricket Hill and
Callis wharf, a distance of 1 mile, and for the construction of a.
stone jetty, 1,183 feet long, at the northwest entrance. The tidal
ranges are, mean, 1.3 feet; extreme, 2 feet; irregular, 4 feet.
   The estimate of cost of new work, revised in 1909, was $27,500.
The latest (1917) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1899 (H. Doc. No. 299, 53d Cong., 3d sess., and Annual
Report for 1895, pp. 1267-1270), extended by River and Harbor Act
of June 6, 1900, for dredging of shoal within harbor, and in 1906
 (Annual Report for 1906, p. 1114) and 1909 (Annual Report for
1909, p. 1241) for construction of jetty at entrance. The latest pub-
lished map is in House Document No. 299, Fifty-third Congress,
third session.
   Terminal facilities.-The waterway has eight improved wharves
of open-pile construction and a small marine railway. The terminal
facilities are considered adequate for the present commerce.
   Operations and results during fiscal year.-Dredgingby contract
was in progress from July 20 to August 7, 1936, on the inner bar.
A total of 29,566 cubic yards was placed on adjacent deposit areas,
at a cost of $9,024.33. Fences were erected to trap drifting sand
on deposit area, with hired labor, at a cost of $602.07.        The costs
for the year were $9 626.40, all applied to maintenance, and the ex-
penditures were $9,633.16.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913 at a saving of $2,932 under the estimated cost. The
controlling depth August 1936 at mean low water was 11.4 feet on
the entrance bar and 12.9 feet on the inner bar.
          RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                          411
  The costs and expenditures were $24,568.25 for new work and
$13,389.73 for maintenance, a total of $37,957.98.
  Proposed operations.-The balance unexpended on July 1, 1937,
$284.21, is not required for maintenance and has been reported for
revocation.
  No additional funds can be profitably expended during the fiscal
year 1939, as it is believed that maintenance will not be necessary.
                                        Cost and financial summary
Cost of new work to June 30, 1937-------------------------$24, 568. 25
Cost of maintenance to June 30, 1937---------------------   13, 389. 73
        Total cost of permanent work to June 30, 1937-----------                                             37, 957.98
Net total expenditures-------------         -        - ____--                                     __         37, 957. 98
Unexpended balance June 30, 1937_--_-------------284.                                                                 21
        Total amount appropriated to June 30, 1937______________                                             38, 242.19

        Fiscal year ending June 30                           1933                1934   1935      1936           1937


Cost of new work......... ....     __.     ... ....    ..................
Cost of maintenance ----------------------     ------------ ------------                           $89. 39      $9, 626. 40
Total expended..       -------------------------------------------------------                       2. 63       9, 633. 16
Allotted --------------------                       --------------                      $10,000     -
                                                                                                    ............


Balance unexpended July 1, 1936--___        _____________                                                    $9, 917. 37
Gross amount expended --------------------------------                                                        9, 633. 16
        Balance unexpended June 30, 1937------ ---------------                                                  284. 21
                                          18. HORN HARBOR, VA.

    Location.-This is a tidal estuary 4 miles in length, located in
Mathews County, Va., entering Chesapeake Bay on its western shore
43 miles northerly of Norfolk, Va. (See U. S. Coast and Geodetic
Survey Chart No. 494.)
    Existing project.-This provides for a channel 7 feet deep and
100 feet wide across the entrance bar. The plane of reference is
mean low water. The mean tidal range is about 2 feet with winds
causing variations of 2 to 3 feet.
    The estimate of cost of new work made in 1933 was $12,000. The
latest (1935) approved estimate for annual cost of maintenance is
 $1,000.
    The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 124, 70th Cong., 1st sess.) and modified
by the River and Harbor Act of August 30, 1935 (Rivers and Harbors
  Committee Doc. No. 22, 73d Cong., 2d sess.), which removed the
  requirement that local interests contribute $6,000 toward the cost of
the improvement. The latest published map is in the latter document.
    Local cooperation.-Local interests are required to provide free
  of cost to the United States suitable spoil disposal areas during
  initial construction and future maintenance, not less than 800 feet
  and not more than 1,200 feet from the center line of the channel, and
  furnish releases from all damages to oyster grounds that may be
412               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

caused by dredging. The cooperation was complied with and ap-
proved August 14, 1936.
  Terminal facilities.-There are 18 wharves and stagings and 1
marine railway within the harbor. Two wharves are open to the
public, and two are solely for fuel-oil companies. The existing
facilities are considered adequate.
   Operations and results during fiscal year.-Dredging by contract
was in progress from April 11, 1937, to June 9, 1937. A total of
52,843 cubic yards were placed on adjacent shoal areas. The total
cost for the year was $11,473.87, all applied to new work, and the
expenditures were $7,856.16.
   Condition at end of fiscal year.-The existing project was com-
pleted June 30, 1937. The controlling depth in June 1937 was 7.4
feet mean low water. The costs were $11,473.87 for new work and
the expenditures were $7,856.16.
  Proposed operations.-The balance unexpended July 1, 1937, $6,-
143.84, will be applied to payment of outstanding obligations. The
unused balance will be reported for revocation.
  No additional funds can be profitably expended during the fiscal
year 1939, as it is believed that maintenance will not be necessary.
                                                Cost and financial summary
Cost of new work to June 30, 1937_111111111                                                           1___11___1_ $11, 473. 87
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937__                                                                    11, 473. 87
Minus accounts payable June 30, 1937__-----_____------_________________                                                   3, 617. 71
     Net total expenditures _________------_____________
                                    ----                                                                                  7, 856. 16
Unexpended balance June 30, 1937_ --           1----------16___                                           ______           , 143. 84
            Total amount appropriated to June 30, 1937--------------                                                     14, 000. 00

           Fiscal year ending June 30                              1933             1934          1935        1936           1937


Cost of new work---------                  ----------........------------..--.. -----           -------   ------------ $11, 473. 87
Cost of maintenance---- . -------------------    ------------------------                      --          ---------- -----------
Total expended....-----------------------------------------------------------                                                7, 856.16

Allotted .---------------------------------                 I------------       ------------ ------------ ------------      14, 000. 00


Amount allotted from War Department Appropriation Act approved
May 15, 1936       ------------------------------------------      $14, 000. 00
Gross amount expended ---------- ______ _                  _   ----   7, 856. 16
      Balance unexpended June 30, 1937----         _____________                                                          6, 143. 84
Outstanding liabilities June 30, 1937____-- __----__      $717. 14
Amount covered by uncompleted contracts ------ __--3,100. 57
                                                                                                                          3, 817. 71

            Balance available June 30, 1937___--                                                   __--___----_           2, 326. 13
                                                    19. YORK RIVER, VA.
   Location.-This river is formed at West Point, Va., by the con-
fluence of the Mattaponi and Pamunkey Rivers, and flows south-
easterly about 41 miles into Chesapeake Bay, which it enters about
20 miles in a northerly direction from Norfolk, Va., and 20 miles in
a northwesterly direction from the Atlantic Ocean at Cape Henry.
 (See U. S. Coast and Geodetic Survey Charts Nos. 494 and 495.)
            RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                                    413
   Existing project.-This provides for dredging a channel 22 feet
deep at mean low water and 400 feet wide through the bars, and a
basin of the same depth at the wharves at West Point, and the con-
struction of a dike on the right bank at West Point to assist in main-
taining the channel. The plane of reference is mean low water.
The tidal ranges are: Mean 2.2 feet at mouth and 2.9 feet at West
Point, and the extreme 3.9 feet at mouth and irregular 6 feet at
West Point.
   The estimate of cost for new work, revised in 1887, is $308,800.
The latest (1928) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was adopted by the River and Harbor Act
of June 14, 1880 (Annual Report for 1880, p. 897). It was modified
in 1884 and 1887. The latest published map is in the Annual Report
for 1894, page 964.
   Terminal facilities.-There are 17 wharves on the York River of
open-pile construction. The facilities are considered adequate for
the existing commerce.
   Operations and results during fiscal year.-Dredging by contract
was in progress from August 12 to September 25, 1936. A total of
128,947 cubic yards was placed on adjacent shoal areas. The total
costs for the year were $18,320.49, all applied to maintenance and
the expenditures were $18,491.79.
    Condition at end of fiscal year.-The existing project was about 75
percent completed in 1899; the part not completed was the dredging
of the channels to the full project width of 400 feet, which was not
considered necessary at that time, and subsequently the navigation
on the York River has not justified completing the project. A pile-
and-timber dike 10,142 feet in length was completed in 1899, but is
now in poor condition. Channels aggregating 2.5 miles were dredged.
The controlling depths are as follows:

                                       Name                                            Depth       Width              Date

                                                                                        Feet          Feet
              -
Poropotank Bar..          -    .--.---.----.    .....-      ..-.-----.--.. __
                                                                            --   ---      20. 5          300     June 1936.
West Point Bar-_ _--------____---------------___                                          19. 5           200         Do.
Basin, West Point----------------------------------------                                 23. 0 -------         I September 1936.



  The cost and expenditures were $180,904.20 for new work and
$172,949,09 for maintenance, which includes $784.91 for Poropotank
Creek, a total of $353,853.29.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939, as it is believed that
maintenance will not be necessary.
  No funds are requested for new work to complete the project, as
widening the channel is not necessary for present navigation.
                                               Cost and financial summary

Cost of new work to June 30, 1937 ........                                               __                        $180, 904.20
Cost of maintenance to June 30, 1937-----_____                                           ---------                  172, 949. 09
      Total cost of permanent work to June 30, 1937                                                  -----          353, 853.29
                     --
Net total expenditures   -------         -   --                                                                     353, 853. 29
Total amount appropriated to June 30, 1937                                                                          353, 853. 29
414         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937



        Fiscal year ending June 30              1933          1934      1935         1936          1937


Cost ofnew work....-----------  ----------             ------------------------------------------
Cost of maintenance..----------   -...   -------            $784. 91 ------------ $236. 03 $18, 320.49
Total expended   ......----------------------------------      784.91                  64. 73     18, 491.79
Allotted---------------------------              $1, 000      -15.09     24,800   ------------
                                                                                         __      -6, 443.48


Balance unexpended July 1, 1936-----                                                        $24, 935.27
Deductions on account of revocation of allotment _______________                              6, 443. 48

      Net amount to be accounted for____     ___                                          1________
                                                                                      ___ 18, 491. 79
Gross amount expended     ________________________________                                18, 491. 79
Amount (estimated) required to be appropriated for completion
of existing project______________                    ___     128, 000.00

                               20. MATTAPONI                RIVER, VA.

   Location.-Rises in Virginia and flows in a southeasterly direction
for about 120 miles to its junction with the Pamunkey River at West
Point, Va., forming the York River. (See U. S. Coast and Geodetic
Survey Chart No. 504.)
   Previous projects.-Adopted by the River and Harbor Act of June
14, 1880, and modified by River and Harbor Act of July 13, 1892.
The total cost and expenditures were $111,689.71, of which $51,249.48
was for new work and $60,440.23 for maintenance. For further
details see page 531 of Annual Report for 1918.
   Existing project.-This provides for a channel 9 feet deep and 150
feet wide from the mouth to Locust Grove, a channel 7 feet deep
and 100 feet wide from Locust Grove to Rosespout, with a basin im-
mediately above Rosespout 7 feet deep, 180 feet wide, and 400 feet
long, and snagging between the mouth and Dunkirk, Va. The dis-
tances from the mouth to Locust Grove, Rosespout, and Dunkirk are
28, 34, and 41 miles, respectively. The plane of reference is mean
low water. The tidal ranges are: Mean, 3.9 at Walkerton, 2.9 at
West Point; extreme, 4.5 at Walkerton, 3.9 feet at West Point; ir-
regular, 7 feet at Walkerton, 6 feet at West Point.
   The estimate of cost for new work, revised in 1935, is $19,250,
exclusive of amount expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $4,500.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 861, 64th Cong., 1st sess.), which pro-
vided for improved channels to Pointers (Rosespout) and snagging
to Dunkirk, and modified by the River and Harbor Act of August 30,
1935 (Rivers and Harbors Committee Doc. No. 47, 73d Cong., 2d
sess.), to provide for the present channel dimensions. The latest
published map is in the latter document.
   Local cooperation.-The approved project provides that local in-
terests shall furnish suitable deposit areas for dredged material with-
out cost to the United States. These requirements will be met when
funds become available.
    Terminal facilities.-Pointerswharf, a shore landing, is the prin-
cipal terminal in the portion of the waterway covered by the dredg-
             RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                             415
ing project. In the portion of the waterway between Walkerton and
Pointers there are two shore landings. In the deeper portions of the
waterway below Walkerton there are about 12 wharves of open-pile
construction and about 13 shore landings. The facilities are con-
sidered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. derrickboat
Atlas was engaged from August 19 to September 19, 1936, in remov-
ing small shoals and snags. A total of 21,314 cubic yards of material
and 525 snags and trees were removed. The total costs and expendi-
tures were $4,000 for the year, all applied to maintenance.
   Condition at end of fiscal year.-No work has been done under the
existing project as modified in 1935, and no expenditure for new
work was required under the project prior to modification as chan-
nels of project dimensidns had been secured by the operating re-
quirements of hydraulic dredges under the previous project. The
controlling depth in September 1936 was 5.5 feet to Pointers. The
total costs and expenditures under the existing project were $50,-
057.22, all for maintenance.
   Proposed operations.-The allotment of $19,250 made during July
1937 will be applied to new work, dredging approximately 77,000
cubic yards, under contract, between the mouth and Rosespout.
   No additional funds can be expended profitably during the fiscal
year 1939, as it is believed that maintenance will not be necessary.
                                          Cost and financial summary

Cost of new work of June 30, 1937------------ -------------                                                     $51, 249.48
Cost of maintenance to June 30, 1937-----------------------                                                     110, 497.45

      Total cost of permanent work to June 30, 1937-----------161, 746. 93
Net total expenditures----------------------------------- 161, 746. 93
Total amount appropriated to June 30, 1937                      61, 746. 93
                                                               1-------------------

          Fiscal year ending June 30                    1933          1934             1935            1936           1937

Cost of new work .......         ..........        ..-...........                      ....................
                         _
Cost of maintenance ---------------------                $233. 21   $4, 266. 56             $200 ----....------         $4, 000
Total expended---         _____-----------------         233. 21     4, 266. 56               200-   - ------            4,000
Allotted------------------------------6.40                           4,406.17     ------------           4,000

Balance unexpended July 1, 1936---------------------------                                                        $4, 000. 00
Gross amount expended---       -------------------------------                                                     4,000.00
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-------------------------------------        9,250. 00
Balance available for fiscal year 1938-------------------   ----- 19, 250. 00
                                        21. PAMUNKEY RIVER, VA.

  Location.-Rises in Virginia and flows in a southeasterly direction
for 130 miles to its junction with the Mattaponi River at West Point,
Va., forming the York River. (See U. S. Coast and Geodetic Survey
Chart No. 504.)
  Existing project.-This provides for securing a channel 7 feet deep
at mean low water and 100 feet wide between Bassett Ferry and the
          20196-37-pt. 1-----27
416           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

mouth of the river, a distance of 50 miles. The tidal ranges are:
Mean, 2.9 feet at West Point, 4 feet at Newcastle Ferry; extreme, 3.5
feet at West Point, 5 feet at Newcastle Ferry; irregular, 6 feet at
West Point, 7.5 feet at Newcastle Ferry.
   The estimate of cost for new work made in 1875 was $17,508.
The estimated cost was revised in 1908 to $55,000 to cover increased
depth and width of channel below Bassett Ferry. The latest (1926)
approved estimate for annual cost of maintenance is $4,000.
   The existing project was adopted by the River and Harbor Act
of June 14, 1880 (Annual Report for 1875, pt. II, p. 162), and
kmodified in 1885 and 1908, partly by increasing the depth and width
of channel below Bassett Ferry and partly by omitting the portion
of the river above Bassett Ferry. The latest published map is in
the :Annual Report for 1890, page 1074.
   Terminal facilities.-There are no wharves existing in the im-
proved section. Six shore landings are located along the banks
  lire deep water is available. They appear to be adequate for the
requirements of present and prospective commerce. In the deep por-
tion of the waterway below the section under improvemnt there exist
20 wiarves or landings.
   Operations and results during fiscal year.-The U. S. derrick
!boat Atla was engaged from July 1 to August 15 in dredging five
shoals. A total of 48,767 cubic yards and 15 snags and trees were
removed. The total costs for the year were $7,243.97, all applied to
maintenance; the expenditures were $9,981.54.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913, at a saving of about $15,000 under the estimated
cost. Channels aggregating 1.6 miles were dredged. Longitudinal
sheet-pile dikes, aggregating 1,478 linear feet, and permeable spur
dikes, aggregating 2,332 linear feet, have been built. The dikes. are
in good condition. The controlling depth in, August 1936 was 7.0
feet, at; mean low water, except at the extreme upper end of the
project. The costs and expenditures were $31,376.44 for new work
and $104,248.53 for maintenance, a total of $135,624.97.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939, as it is believed that
mainitenance will not be necessary.
                                       Cost and financial summary
Cost of new work to fJurie30, 1937_-------------------------- $31, 376. 44
-Cost of maintenance to June 30, 1937 -------------------------104, 248. 53
       Total cost of permanent work to June 30, 1937---____------- 135, 624.97
Net total expenditures--------   ----------------------------     135, 624. 97
Total amount appropriated to June 30, 1937--------------------135, '624.97
         Fiscal year ending June 30                  1933         1934          1935                 1936         1937


Cost of new work--.........----------        ----------------      ------       ------------------
Cost of maintenance..-------......-----------     $1, 329. 13 $5, 379. 73    $1, 017. 91 $2, 75. 03             $7, 243.97
Total expended.----      .      .-------------------
                                                   1, 329. 13    5, 379. 73    1,017.91               18.46       9, 981. 54
A11oited.----------------    -------    ------      -- 35. 30    6, 362.07    10,000.00     -


Balance unexpended July 1, 193----6
                                 ......--------                                                               $9, 981. 54
Gross amount expended_ --------                                        -
                                                                __--_-----                      --             9, 981. 54
         RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                               417
22. CHANNEL CONNECTING YORK RIVER, VA., WITH BACK CREEK TO
                     SLAIGHT'S WHARF
   Location.-The channel known as the "Thorofare" lies in York
County, Va., 39 miles northerly from Norfolk, Va., and connects
Back Creek, a tidal estuary on the west shore of Chesapeake Bay
with the York River. (See U. S. Coast and Geodetic Survey Chart
No. 494.)
   Existing project.-This provides for a channel 7 feet deep and 80
feet wide across the York River flats, and 60 feet wide through the
Thorofare. The plane of reference is mean low water. The: mean
tidal range is 2.4 feet with winds causing variations of 2 to 3 feet.
The estimate of cost for new work made in 1934, including $2,500
contributed by local interests, is $22,500. The latest (1935) approved
estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935. (Rivers and Harbors Committee Doc. No. 6,
74th Cong., 1st sess.) The latest published map is in the project
document.
   Local cooperation.-The approved project provides that local in-
terests shall contribute $2,500 toward the cost of the improvement
and furnish free of cost to the United States suitable areas for the
disposal of dredged material during initial construction and for
future maintenance as and when needed, and that they will construct
a public wharf at or near Slaight's Wharf and an improved road
connecting it with the main highway. The cooperation was com-
plied with and approved August 13, 1936.
   Terminal facilities.-There are no landings or other facilities on
the Thorof are. A number of small wharves and landings in Back
Creek serve the individual owners. These facilities are considered
adequate for present commerce.
   Operations and results during fiscal year.-Dredging under con-
tract was in progress from June 13 to June 30, 1937, and a total
of 30,000 cubic yards was removed and placed in adjacent deposit
areas at a cost of $5,982.02, all applied to new work. There were
no expenditures for the year.
   Condition at end of fiscal year.-The project was 37 percent com-
pleted June 30, 1937. The controlling depth in June 1937 was 1.5
feet for a channel width of 15 feet. The cost was $5,982.02 for.new
work. There were no expenditures for the year.
   Proposed operations,- The balance unexpended on July 1, 1937,
$19,500, including $2,500 contributed funds, will be applied' as fol-
lows :
Accounts payable July 1, 1937               ----------------------------        $5 982; 02
Completion of dredging, under contract, 52,000 cubic yards (July
  1937)-----------                 -----------------------------------          13, 517. 98
      Total-----.----------------------                               --------- 19 500. 00
  No additional funds can be profitably expended during the fiscal
year 1939, as it is believed that maintenance will. not be necesary.     ,
                             Cost and financial summary
                                 UNITED    STATES FUNDS
Cost of new work to June 30, 1937____----- -          ---       .               $598202
Cost of maintenance to June 30, 1937__,_
       Total cost of permanent work to June 30, 1937---------..                  5, 982. 02
418            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937__                                                                                                 $5,'982. 02

     Net total expenditures___                                                  ___
Unexpended balance June 30, 1937__--                                              ___________________                                  17, 000. 00
           Total amount appropriated to June 30, 1937 _________--____                                                                  17, 000. 00

           Fiscal year ending June 30                            1933                   1934              1935              1936            1937

Cost of new work ------                 -----------------------------------------------------                                              $5, 982.02
Cost of maintenance ...
Total expended          ---................-                                                                             -.
Allotted          -----------                    ----------------------------------------------                                            17,000.00


Amount allotted from War Department Appropriation Act approved
May 15, 1936      -----------------------------------------   $17,000.00
Balance unexpended June- 30, 1937_________     _________________                                                                       17, 000.00
Outstanding liabilities June 30, 1937________________ $2, 054. 76
Amount covered by uncompleted contracts ___________ 13, 667. 80
                                                                                                                                       15, 722. 56
           Balance available June 30, 1937 --------                                               __ --          -----      __          1, 277. 44

                                                  CONTRIBUTED                      FUNDS

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937
Net total expenditures
Unexpended balance June 30, 1937-----_______________--__      2, 500. 00
Tdtl amount contributed to June 30, 1937-- _________________2, 500. 00

           Fiscal year ending June 30                           1933                   1934               1935             1936             1937


Cost of new work .------
Cost of maintenance ---              ---       ------------                ---------------            ------- ---------------
Total expended--..-----------------------------                             ----           ------------                  ----------
Contributed.-------------------------                  ------------ ------------ ----------                                 $2,500..


Balance unexpended July 1, 1936 ----------------------------                                                                           $2, 500.00
Balance unexpended June 30, 1937 -----------                 ---                                                         ----           2, 500. 00
Ad tilt covered by uncompleted contracts ---------------                                                                                2, 500. 00
   CONSOLIDATED         COST AND FINANCIAL                           SUMMARY                  FOR YORK            RIVER-BACK             CREEK
                                                               CHANNEL
Cost of new work to June 30, 1937--                                        -----------------------                                     $5,982.02
Cost of maintenance to June 30, 1937
     Total cost of permanent work to June 30, 1937----------                                                                       - 5, 982. 02
Minus accounts payable June 30, 1937  --------------------                                                                           5, 982. 02
     Net total expenditures----------------------------                                                                             ---------

Unexpended balance June 30, 1937--------------------------------                                                                       1.9, 500. 00
io~1l amount appropriated and contributed to June 30, 1937-------                                                                      19, 500. 00

           Fiscal year ending June 30                           1933                    1934              1935             1936             1937


Cost of new work- __..----------.                    ...------
                                                     ---------              -----------------------------------                            $5,982.02
Cost of maintenance .            ....----- ------------------
                                                 I.   .       .------------                                        ------------ ----------
Total expended__-----------------------------
Allotted and contribnted            .......------------..                                         .......-....                $2,500       17, 000.00
             RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                     419
Balance unexpended July 1, 1936--.-----.---------------------   $2,500.00
Amount allotted from War Department Appropriation Act approved
  May 15, 1936-----__------------------------------------------ 17,000.00
          Amount to be accounted for------------------------------                                        19,500.00
Balance unexpended June 30, 1937-----------------------------     19,500.00
Outstanding liabilities June 30, 1937------- ------    $2, 054.76
Amount covered by uncompleted contracts-------------- 16, 167. 80
                                                                  18, 222.56

         Balance available June 30, 1937---------------------------                                        1,277.44
   23. EXAMINATIONS,                    SURVEYS, AND CONTINGENCIES                               (GENERAL)
  The cost of the work during the year amounted to $58,635.55, and
the expenditures were $53,145.19. The balance unexpended June 30,
1937, $33,999.38, including $25,000 allotted in July 1937, will be ap-
plied as needed during the fiscal year 1938 to expenses incurred
under this heading. The additional sum of $36,000 can be profitably
expended during the fiscal year 1939.
                                        Cost and financial summary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937-------------------------                                        $405, 312. 74
      Total cost of permanent work to June 30, 1937------------                                       405, 312. 74
Undistributed costs, June 30, 1937________ __--_______                                                    -96. 00
     Net total cost to June 30, 1937---------------------------                                       405, 216. 74
Minus accounts payable June 30, 1937--------------------------                                          8,999. 38
     Net total expenditures-----------------------------------                                       396, 217. 36
Unexpended balance June 30, 1937--______----------------                               -------         8, 999.38
         Total amount appropriated to June 30, 1937---------------405, 216. 74

         Fiscal year ending June 30                  1933         1934          1935          1936            1937

Cost of new work-------           ..----------------------------------------------------------
Cost of maintenance_                              $33, 456. 30 $28. 971. 07 $59, 851. 40 $54, 278.08
                                     ____-------------------                                         $58, 635. 55
Total expended--.-----------------------..        31, 349. 66   30, 249. 12   59, 853. 39   52, 364. 48      53, 145. 19
Allotted----------..---------------------         28, 330. 00   62, 950.00    65, 800.00    33, 446. 74      38, 200. 00

Balance unexpended July 1, 1936___------------------------------$23,                                         944.57
Amount allotted from War Department Appropriation
  Act approved Apr. 9, 1935 -- _____________________ $10, 000. 00
Amount allotted from War Department Appropriation
  Act approved May 15, 1936-------------------------_   28, 200. 00
                                                                                                          38, 200. 00
      Amount to be accounted for____________-----------------------------62, 144. 57
Gross amount expended---------------------------------------- 53, 145. 19
     Balance unexpended June 30, 1937------------------------                                              8, 99. 38
Amount covered by uncompleted contracts-------------- -------                                              8, 999. 38
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------------                                            15, 000. 00
Balance available for fiscal year 1938--_-__-
                                           ---  --------                                                  15, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1'--------       --     -- - 36, 000. 00
SExclusive of available funds.
420                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

24. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                               [Commercial statistics for these projects are given in pt. 2 of report]

                                                                   For last             Cost and expenditures to             Estimated
                           Name of project                        full report                 June 30, 1937                    amount
                                                                 see annual                                                  required to
                                                                 report for-            New work         Maintenance          complete


  1. Potomac River at Alexandria, Va.-----------_                         1936           $95, 214. 52     $163, 556. 22      Completed.
2.   Occoquan Creek, Va.'------------------------      1936                              66, 252. 95    81, 033. 90         $22,700.
3.   Aquia Creek, Va.       ----------------------     1928                              52, 464. 84     11, 750..00        Completed.
4.   Upper Machodoc Creek, Va.'----------------1916                                      20, 281. 28      6, 118. 72             Do.
5.   Namini Bay and Creek, Va.----------------         1935                              78, 446. 21    30, 841. 62         $9,500.
6.   Breton Bay, Md.' _______ ___--..      ___-------_ 1936                              47, 923. 55     11, 879.00         $7,500.
7.   Smith Creek, Md.-----      ------------------     1936                               5, 252. 22   -------------        Completed.
8.   Patuxent River, Md.1 -                   ____     1905                              14, 000.00 -------------           $6,000.
9.   Cockrells Creek, Va.3_               _            1932                                                                 $59,000.
10.   Dymers Creek, Va.' -----------------------        1912                               5, 581. 99         3, 418.01      Completed.
11.   Locklies Creek, Va.-----------------------1928                                      11, 581. 22            518. 78          Do.

  1 Channels adequate for commerce.
  9 Abandonment recommended in 1903 (Rivers and Harbors Committee Doc. No. 32, 61st Cong., 2d sess.).
  3 Awaiting local cooperation.

              25. PLANT ALLOTMENT FOR WASHINGTON, D. C. DISTRICT

                                             Cost and financial summary

Undistributed costs June 30, 1937--------------------------                                                              $436, 393. 43
Net total cost to June 30, 1937-- -----------                                                 _____           __-          436, 393. 43
Plus accounts receivable June 30, 1937--------                                                __------               -      93, 299. 22
      Gross total costs to June 30, 1937______________
                                        --                                                                      __529,           692. 65
Minus accounts payable June 30, 1937------------- ------                                                                     84, 435. 21
     Net ,-total expenditures---  --------------------------                                                               445, 257. 44
Unexpended balance June 30, 1937_-----     ______    -____ __ _                                                             24, 292. 09
             Total amount appropriated to June 30, 1937--__--____----                                                      469, 549. 53

      Fiscal year ending June 30                   1933                   1934             1935               1936               1937


             .........--------........--..
Total expended------------                                 ............--------------   $467, 119. 11       $53, 671. 54      -$75, 533. 21

Allotted_ .........................-               --        _---......                  539, 839. 72      -31, 800. 00        -38, 490. 19


Balance unexpended July 1, 1936__ __-________________             -- $12, 750. 93
Deductions on account of revocation of allotment ----------------     38, 490. 19
      Net amount to be accounted for      --------------------     -51,                                                          241. 12
Gross amount expended-_--__--   __________     ___   $404,199. 73
Less:
    Reimbursements collected-___-__-   $470, 201.22
    Receipts from sales---                9, 531. 72
                                          -            479, 732.94
                                                                                               --                            75, 533. 21

      Balance unexpended June 30, 1937________- ___ ---------                                                                24, 292.09
Outstanding liabilities June 30, 1937-------------------------                                                              143, 144. 54

     Balance available June 30, 1937-------------------                                                               -118, 852.,45
Accounts receivable June 30, 1937--------------_
                                   __---------                                                                           93, 299..22

              Unobligated balance available June 30, 1937-------------                                                     --25, 553. 23
          RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                                421
                  26. POTOMAC RIVER BASIN, FLOOD CONTROL

  Location.-The works covered by this project are as follows: Both
banks of the Moorefield River at Moorefield, W. Va.; left bank of
the Shenandoah River, and the right bank of the Potomac River,
extending upstream from their point of confluence at Harpers Ferry,
W. Va.; both banks of the north branch of the Potomac River and
of Wills Creek approximately within the city limits of Cumberland,
Md., and Ridgeley, W. Va.; left bank of the Anacostia River, and
both banks of the Potomac River within the District of Columbia,
and along Arlington County, Va.
  Existing project.-The Flood Control Act approved June 22, 1936,
authorized flood-control works at the following localities in accord-
ance with report published in House Document No. 101, Seventy-
third Congress, first session:

                                                                                             Estimated           Estimated
                                     Project                                                 construc-           laconds ofd
                                                                                             tion cost           lands and
                                                                                                                  damages

Washington, D. C., levees and grade raising to protect downtown portion of
Washington, Arlington Experimental Farm, Bolling Field, and Anacostia
Naval Air Station ........-------------------------------------------------                    $571, 000              $16, 000
Cumberland, West Cumberland, South Cumberland, Md., and Ridgeley,
W. Va.; levees, retaining walls, movable dam, and chaniel clearing to protect
people and city property--------------------------------------------743,                               400            143, 700
Moorefield, W. Va., levee on Moorefield River to protect people and town prop-
erty_----------------      _----------------------------
                                                       ------        _            ----             41,500                  5, 400
Harpers Ferry, W. Va., levees and concrete flood wall to protect people and town
property......................                                                                     164, 900
                                                                 .............---------------------------------------------------------..
                                                                                                                           4, 000
     Total        -------------------------------------------------------                      1, 520, 800             169, 100



   Local cooperation.-See page 6. At Washington, D. C., the neces-
sary Government agencies have approved the location of the protec-
tive :orks, and for the Arlington County levees, easements have not
been provided due to unsettled question of ownership. At Cumber-
land, Md., and Ridgeley, W. Va., the authorizing legislation has been
obtaihed by the city council of Cumberland to cover the cost of
securing rights-of-way and easements and some progress has been
made in negotiating with property owners. At Harpers Ferry,
W. Va., local authorities have advised that the required coopera-
tion will not be furnished, At Moorefield authorities have indicated
the .local cooperation would be forthcoming when a restudy de-
termines the requirements.
   Operations and results during fiscal year.-Work on levees on the
Anacostia River for the protection of Bolling Field and the Naval
Air Station, D. C., was carried on during the fiscal year under an
emergency relief allotment, and, consisted of preparation of borrow
pits and site at a cost of $11,178.68; placing of material for levee,
175,932 cubic yards at a cost of $107,977. 20; and construction of wall
foundations, flood gates and appurtenant features at a cost of $16,-
176.99. The total costs for the fiscal year under this portion of the
existing project were $135,332.87, all applied to new work, and the
expenditures were $146,065.27.
   Condition at end of fiscal year.-The existing project for the
Potomac River Basin flood control was 12.5 percent completed in
422               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

1937, the amount completed consisting of the work described in the
preceding paragraph in addition to an emergency levee built by the
National Capital Parks office during the flood of March 1936, back
of the Navy-Munitions Building, Washington, D. C., part of which
will be incorporated in the completed project. The total costs, ex-
cluding the cost of this emergency levee and the field surveys con-
ducted in the vicinity of Cumberland, Md., were $135,332.87, all
applied to new work at Washington, D. C., and the expenditures
were $146,065.27.
  Expenditures for surveys and investigations at Cumberland were
defrayed from Emergency Relief funds-assistance for educational,
professional, and clerical persons.
  Proposed operations.-The funds unexpended July 1, 1937, $15,-
934.73, will be applied to the payment of outstanding liabilities.
  An anticipated allotment of $301,500 for the fiscal year 1938 will
be applied as follows:
New work:
   Washington, D. C.:
       Completion of levees and bulkheads and repair of slip in levee
                   at Bolling Field and Naval Air Station_ _ ______--                   ------             $139, 000
          Potomac Park levees ---------------------------------                                              136, 500
    Cumberland, Md.: Preparation of plans and specifications for re-
       taining walls and bridges (July 1937-June 1938) -------------                                          18, 000
     Moorefield, W. Va.: Preparation of plans_---   ------      ----                                           8, 000

            Total --------- -------------------------------------------                                      301,500
  An additional sum of $13,500 can be profitably expended during
the fiscal year 1939 for completion of the Potomac Park levees.
                                        Cost and financial summary
                                   WASHINGTON,      D. C.-FLOOD OONTROL

Cost of new work to June 30, 1937---------------------                                                  $135, 332. 87
Cost of maintenance to June 30, 1937                               --------             ----            -----------
      Total cost of permanent work to June 30, 1937______----                                            135, 332. 87
Undistributed costs June 30, 1937  ---------------------                                                  15, )81. 36

      Net total cost to June 30, 1937_       -____-_- _____-
Minus accounts payable June 30, 1937----__-___-____________
                                                             --                                          150, 414. 23
                                                                                                           4, 848. 96
     Net total expenditures ------------------------------------                                         146, 065. 27
Unexpended balance June 30, 1937--------------------------      _                                         15, 934. 73
            Total amount appropriated to June 30, 1937-----------------                                  162, 000. 00

           Fiscal year ending June 30             1933               1934        1935            1936          1937


Cost of new w ork--__-_
                    .   -          --.-                                   ----------
                                                               ------------     _    --          .--
                                                                                                   -- --    $135,332.87
Cost ofmaintenance-----                                                       ---------          -------
Total expended.....-------------- ----        ------------    -------------      -------------------         146,065. 27
Allotted--.....----------.-.   .                             ----------------------------------              162,000. 00
           RIVERS AND HARBORS -WASHINGTON,                                                             D. C., DISTRICT          423.
Amount allotted from Emergency Relief Appropriation Act ap-
proved June 22, 1936--------------------------------------- $162, 000. 00
Gross amount expended       --------------------------------- 146, 065. 27

      Balance unexpended June 30, 1937-----------------------                                                           15, 934 73
Outstanding liabilities June 30, 1937----------------------------                                                       15, 934. 73

Amount (estimated) required to be appropriated for completion of
   existing     project                                                                                             1----------------
                                                                                                                    1,  022, 300. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work----------------------------------------                                                         13, 500. 00
   1 Exclusive of available funds.

Status of reports called for by river and harbor acts and committee resolutions

                                                           Date trans-                                                Recommenda-
        Locality              Authorization act             mitted to                               Document no.      Recommend-
                                                            Congress


Coan River, Va_ _.._._      Rivers and Harbors           May 11, 1937                      Rivers and Harbors         Favorable.
                             Committee resolu-                                               Committee, 30, 75th
                             June 15, 1936.                                                  Cong., 1st sess.
Conoy Lake, Md., and        River and Harbor Act,        Nov. 18, 1936                     ....................       Unfavorable.
entrance from Poto-         Aug. 30, 1935.
mac River.
Dogue Run, Va________ ... do -   ......__-  - - -        Oct. 18, 1936                                                    Do.
Drum Point Harbor, -- do.--- -               ___-----    Nov. 19, 1936                     ....................           Do.
Md.
Garden Creek, Math- River and Harbor Act,                                                .....................            Do.
ews County, Md.          Aug. 26, 1937.
Greenvale (Fairweather) -. do..............              Oct.              5,1936----
Creek, Lancaster
County, Va.
Hoskins Creek, Va....._ Rivers and Harbors               Oct.              5, 1936         Rivers and Harbors         Favorable.
                             Committee resolu-                                               Committee, 8, 75th
                             tion, Nov. 18, 1935.                                            Cong., 1st sess.
Hulls Creek, Northum-       Rivers and Harbors
berland County, Va.         Committee resolu-
                             tion, Jan. 27, 1937.
Hulls Creek and Rogers River- and Harbor
  Creek, Northumber-     Act, Aug. 26, 1937.
  land County, Va.
Island Creek, St. -_ _do ...............
  Georges Island, St.
  Marys County, Md.
Jackson Creek, Va__-__ Rivers and Harbors                Dec. 12, 1936                                                Unfavorable.
                              Committee resolu-
                              tion; June 20, 1935.
Meachims Creek, Mid-        River and      Harbor       ...............
dlesex County, Va.           Act, Aug. 26, 1937.
Monroe Bay and Creek,       Rivers and Harbors           Apr.              8, 1937                                        Do.
Va.                          Committee resolu-
                              tion, Apr. 28, 1936.
Neale Sound, Md ___
                ...         River and Harbor             Feb. 24,1937                      House, 159, 75th Cong.,    Favorable.
                              Act, Aug. 30, 1935.                                           1st sess.
Potomac River and trib-     Flood Control Act           ...............                  ........................
utaries (preliminary         May 5, 1936.
examinati.on for flood
control).
Queens Creek. Mathews River and Harbor
  County, Va., channel   Act, Aug. 26, 1937.
  to Hills Bay.
St. Catherines Sound, -...do ..------------
  St. Marys County,
  Md.
St. Jeromes Creek, St. River and Harbor                  Mar. 18, 1937                     House, 174, 75th Cong.,        Do.
  Marys County, Md.      Act, Aug. 30, 1935.                                                1st sess.
St. Marys River, Md __ ._ do_-_-        _ _-__---
                                              __         Jan.             14,1937                                     Unfavorable.
St. Patricks Creek, St. River and Harbor                  Jan. 22,.1937
  Marys County, Md.      Act, Aug. 26, 1937.
Whitings Creek, Mid- .-       -do--------------                                          ....................
                                                                                         ........................
  dlesex County, Va.
Wicomico River, Md., River and Harbor                     Jan. 22, 1937                                                   Do.
  Chaptico Wharf to       Act, Aug. 30, 1935.
  Budds Landing.
Woods Creek, Middle- River and Harbor
  sex County, Va.         Act, Aug. 26, 1937.
York River, Va....___.. Rivers and Harbors               June              9,1937                                         Do.
                              Committee resolu-
                              tion, Mar. 26, 1936.
                                        i                                            i
424        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
            NORFOLK, VA., DISTRICT
   This district includes the watersheds tributary to Chesapeake Bay,
from and including Poquoson River, Va., on the west shore, south-
erly and easterly to the Atlantic Ocean at Cape Henry, Va., the
watersheds tributary to the Atlantic Ocean from Cape Henry, Va.,
to and including Oregon Inlet, N. C.; and also that portion of the
intracoastal waterway between Norfolk, Va., and Beaufort Inlet,
N. C., north of the New Holland, Higginsport and Mount Vernon
Railroad crossing in Hyde County, N. C.
   District engineer: Lt. Col. John H. Carruth, Corps of Engineers.
   Acting district engineer: Maj. H. R. Cole, Corps of Engineers,
since August 3, 1936.
   Division engineer: Col. Earl I. Brown, Corps of Engineers.
                                  IMPROVEMENTS

                                   Page                                     Page
1.   Norfolk Harbor, Va_______   424     13.   Knobbs Creek, N. C _____     451
2.
3.
      Thimble Shoal Channel, Va_
                    -----------
      James River, Va
                                  428
                                  430
                                          14.
                                          15.
                                                                   ------
                                                Meherrin River, N. C
                                                Edenton Harbor, N. C .
                                                                             452
                                                                             454
4.   Willoughby Channel, Va...   433     16.   Cashie River, N. C_ .....    455
5.   Hampton Creek, Va- ---- _   434     17.   Roanoke River, N. C--      _ 457
6.   Channel from Phoebus, Va.,          18.   Scuppernong River, N. C___   458
        to Hampton Roads ---      436     19.   Manteo (Shallowbag) Bay,
7.   Lafayette River, Va_____ .  438             N. C-----                  460
8.   Appomattox River, Va .-- _- 439     20.   Mackay Creek, N. C------ -461
9.   Deep Creek, Va------------441       21.   Examinations, surveys, and
10.   Pagan River, Va -----       442             contingencies (general)_   462
11.   Waterway from Norfolk, Va.,         22.   Other projects for which no
        to the Sounds of North                    estimates are submitted-_  463
        Carolina __------_----    444     23.   Plant allotment_----------   463
12.   Inland Waterway from Nor-
        folk, Va., to Beaufort
        Inlet, N. C .__._______   447

  The following improvement is divided into three subheads: (1)
Norfolk Harbor, (2) Thimble Shoal Channel in the southern end of
Chesapeake Bay, and (3) (see p. 463) the channel leading to Newport
News from Hampton Roads.
                        1. NORFOLK HARBOR, VA.

  Location.-Norfolk, Va., is 187 miles south of Baltimore, Md., and
30 miles from the entrance to Chesapeake Bay at Cape Charles and
Cape Henry. The harbor extends between the 40-foot contour in
Hampton Roads and 2,500 feet above the Norfolk & Western Rail-
way bridge over the Southern Branch of the Elizabeth River, a dis-
tance of 16.03 miles. (See U. S. Coast and Geodetic Survey Charts
Nos. 400 and 452.)
  Previous projects.-Adopted by River and Harbor Acts of Au-
gust 14, 1876; July 5, 1884; modified June 30, 1885; and by River
and Harbor Acts of September 19, 1890; June 3, 1896; July 7, 1898;
June 13, 1902; March 3, 1905; and March 2, 1907. The total cost
and expenditure was $2,633,743.54, of which $2,561,704.27 was for
          RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                 425
new work and $72,039.27 was for maintenance. For further details
see page 1795 of Annual Report for 1915.
    Existing project.-This provides for a main channel 40 feet deep
at mean low water, 750 feet wide from Hampton Roads to the mouth
of the Southern Branch of Elizabeth River, and 450 feet wide up
this branch to the Belt Line Railroad bridge, a total distance of
11.88 miles, and dredged areas in front of the navy yard, on either
side of the .40-foot channel, immediately downstream from the Belt
Line Railroad bridge, 35 feet deep for a width varying from 600
feet to 800 feet; thence 30 feet deep, 375 feet wide, and 1.05 miles
long to the Virginian Railway bridge; and thence 25 feet deep: and
generally 200 feet wide, and 3.10 miles long to a point 2,500 feet
above the Norfolk & Western Railway bridge, making a total dis-
tance of 16.03 miles; a channel in the Eastern Branch, 25 feet deep at
mean low water, 500 feet wide, and 1.09 miles long, from the 40-fot
channel at the mouth to the Norfolk & Western Railway bridge, in-
cluding within its limits, for a distance of about 1,000 feet above the
mouth, a channel 30 feet deep and 300 feet wide to a point opposite
the terminal of the Imperial Tobacco Co. in Berkley; thence 25 feet
deep, 200 feet wide, and 1.75 miles long to the Virginian Railway
bridge; a channel in the Western Branch, between the 40-foot chan-
nel at the mouth and a point about 3,000 feet above the West Norfolk
Highway Bridge, a distance of about 1.72 miles, 24 feet deep at mean
low water, 300 feet wide, 0.78 mile, and 200 feet wide, 0.37 mile to
the bridge; thence 18 feet deep, 150 feet wide, 0.57 mile; a channel
in Scotts Creek between the 40-foot channel at the mouth and a
point 100 feet above the Atlantic Coast Line Railroad bridge (about
0.73 mile upstream), 12 feet deep at mean low water and 100 feet
wide; and an anchorage area on the west side of the 40-foot channel
opposite Lambert Point and south of Craney Island of about 66
acres, 30 feet deep at mean low water, and another of 45 acres, 12
feet deep, near Pinner Point.
    The mean tidal range is 2.7 feet and the extreme 3 feet. The
extremes of irregular fluctuations, due to combined effect of tides
and wind, referred to mean low water, are -2 feet and + 9.62 feet.
    The estimate of cost for new work, revised in 1935, exclusive of
amounts expended on previous projects, is $6,557,700. The latest
  (1935) approved estimate for annual cost of maintenance is $81,500.
    The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for the improvement
of the Eastern Branch (Annual Report for 1885, p. 1015) ; act of
March 2, 1907, provided for a 30-foot channel to the navy yard, a
22-foot and a 25-foot channel in the Eastern Branch, and the re-
moval of shoals at the mouth of the Eastern Branch (H. Does. Nos.
373 and 381, 59th Cong., 1st sess.); act of June 25, 1910, provided
for a 35-foot channel to the navy yard, 22- and 25-foot channels in
the Southern Branch, and a 30-foot anchorage area at Lambert
Point (H. Doc. No. 551, 61st Cong., 2d sess.); act of March 4, 1913,
provided for a 24-foot channel in the Western Branch from the
mouth to the West Norfolk Highway Bridge (H. Doc. No. 566, 62d
_Cong., 2d sess.) ; act of August 8, 1917, provided for a 40-foot channel
426     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

to the navy yard, a 35-foot anchorage opposite Lambert point, and a
12-foot anchorage near Pinner Point (H. Doc. No. 605, 63d Cong.,
2d sess., and H. Doc. No. 140, 65th Cong., 1st sess.); act of March
3, 1925, provided for a 30-foot depth in the Southern Branch to the
Virginian Railway bridge and a 25-foot depth to the Norfolk &
Western Railway bridge, and a 25-foot depth in the Eastern Branch
from the Norfolk & Western Railway bridge to the Virginian Rail-
way bridge (H. Doc. No. 226, 68th Cong., 1st sess.); act of July 3,
1930, provided for a 30-foot depth in the Eastern Branch opposite
the terminal of the Imperial Tobacco Co. (H. Doc. No. 37, 71st Cong.,
1st sess.), an 18-foot channel in the Western Branch above the West
Norfolk Highway Bridge (H. Doc. No. 265, 70th Cong., 1st sess.),
a 12-foot channel in Scotts Creek (H. Doc. No. 189, 70th Cong., 1st
sess.), and a 30-foot anchorage on the west side of the 40-foot channel
opposite Lambert Point and elimination of the 35-foot anchorage
area (H. Doc. No. 143, 70th Cong., 1st sess.); and the following fea-
tures of the project were authorized May 28, 1935, by the Emergency
Relief Appropriation Act of 1935, and by the act of August 30,
1935: The extension of the 25-foot channel in the Southern Branch,
with a minimum width of 200 feet, to a point 2,500 feet above the
Norfolk & Western Railway bridge, and a turning basin 500 feet
square at a suitable location (H. Doc. No. 182, 73d Cong., 2d sess.).
The latest published maps are printed in the following documents:
Norfolk Harbor, House Document No. 605, Sixty-third Congress,
second session; Southern and Eastern Branches Elizabeth River,
House Documents Nos. 226, Sixty-eighth Congress, first session, and
182, Seventy-third Congress, second session; anchorage basin vicinity
Craney Island, House Document No. 143; Scotts Creek, House Docu-
ment No. 189; and Western Branch Elizabeth River, House Docu-
ment No. 265, Seventieth Congress, first session.
   Local cooperation.-The River and Harbor Act of July 3, 1930, in
adopting the project for a channel in the Eastern Branch, 30 feet
deep and 300 feet wide, extending from the 40-foot channel to a point
opposite the terminal of the Imperial Tobacco Co., imposed the con-
dition that local interests give assurance satisfactory to the Secretary
of War and the Chief of Engineers that they will provide and
maintain, without cost to the United States, a branch channel of equal
depth to the tobacco terminal. This condition has not yet been com-
plied with.
    All prior requirements and the condition imposed by the River
and Harbor Act of August 30, 1935, have been complied with.
    Terminal facilities.-The terminal facilities within the limits of
this improvement include about 227 wharves, piers, etc., with an
aggregate length available for wharfage purposes of about 32 miles.
It is considered that the facilities are adequate for the present com-
merce of the port. For further details see page 465, Annual Report
for 1932.
    Operations and results during fiscal year.-Maintenance dredging
by contract for the restoration of project dimensions in the 30- and
40-foot channels of the Southern Branch of Elizabeth River was
performed between July 6 and October 17, 1936. There were re-
moved 247,444 cubic yards of material from 6,000 feet of channel.
The cost of the work was $116,858.47.
          RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                         427
   Maintenance dredging by contract for widening the 25-foot chan-
nel at a bend in the Southern Branch of Elizabeth River was per-
formed between October 23 and December 2, 1936. There were
removed 122,673 cubic yards of material. The cost of the work was
$19,683.83.
   Maintenance work under contract for the construction of a con-
crete wharf on the Fort Norfolk Reservation was commenced on
April 12, 1937, and continued to the end of the fiscal year. The
work was about 56 percent completed. The cost of the work was
$9,905.08.
    Miscellaneous maintenance and surveys made during the year cost
$10,342.53. The total cost was $156,789.91, all for maintenance.
The total expenditure was $153,509.36.
    Condition at end of fiscal year.-The existing project was about
97 percent completed at the end of the fiscal year.
    The controlling depths at the end of the fiscal year were as fol-
lows: From Hampton Roads to the mouth of the Eastern Branch
38 feet; thence to a point 800 feet below the Belt Line Railroad
bridge, 40 feet; thence to the bridge, 32 feet; in the Southern Branch
between the Belt Line Railroad bridge and the Virginian Railway
bridge and between the Virginian Railway bridge and a point 2,500
feet above the Norfolk & Western Railway bridge, 30 feet and 25
feet respectively; in the Eastern Branch between the 40-foot channel
and the Norfolk & Western Railway bridge, 24 feet, and between
the Norfolk & Western Railway bridge and the Virginian Railway
bridge, 21 feet; in Scotts Creek, 10 feet; and in the Western Branch
between the 40-foot channel and a point 3,000 feet above the West
Norfolk Highway bridge, 16 feet. This information is based upon
surveys made between 1934 and 1936. -
    The work remaining to be done consists of dredging a channel 30
feet deep and 300 feet wide in the Eastern Branch between the 40-
foot channel at the mouth and a point opposite the terminal of the
Imperial Tobacco Co., a distance of about 1.000 feet, and dredsing
a turning basin 500 feet square at a point 2,500 feet above the Nor-
folk & Western Railway bridge across the Southern Branch.
    The total cost has been $7,858,002.37, of which $6,318,639.32 was
regular funds and $49,978 50 Emergency Relief funds, a total of
 $6,368 617 82 all for new work, and $1,489,384 55, regular funds, for
maintenance. The expenditures were $7,804,417.64, regular funds
and $49.978.50 Emergency Relief funds, a total of $7,854,396.14.
In addition, $23,935.71 was expended from contributed funds.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, $51,086.58, will be applied as follows:
Accounts payable June 30, 1937_____
                                -        _____________________    ___ $3, 606. 23
Maintenance:
    Maintenance of the 25-foot channel in the Southern Branch of
      Elizabeth River, by contract, 70,000 cubic yards, October 1937_ 24, 780. 35
   Construction of concrete wharf at the Fort Norfolk Reservation,
      by contract,   July-August 1937____________________________      13, 700. 00
    Construction of garage at the Fort Norfolk Reservation, by
     contract, August-October 1937_____  ____________________            9, 000.00
        Total for all work__        ______-________        -____________51,086. 58
428              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The additional sum of $300,000 can be profitably expended during
the fiscal year ending June 30, 1939,. as follows:
Maintenance:
   Maintenance of the 40-foot channel, between the Belt Line Rail-
      road bridge across the Southern Branch of Elizabeth River and
      Hampton Roads, with United States hopper dredge, November
      1938-April 1939 --------------------------                    $150, 000
   Maintenance of the Craney Island 30-foot anchorage, by contract,
      March-June 1939-        -                                       75, 000
   Maintenance of the 25-foot channel in the Eastern Branch of
      Elizabeth River, between the mouth and the Virginian Rail-
      way bridge, by contract, July-November 1938 -           -       75, 000
               Total----------------------------------------------                                                    300, 000
                                             Cost and financial summary
Cost of new work to June 30, 1937------------                                                          12 $8,    930, 322.09
Cost of maintenance to June 30, 1937 ----------------------                                                   1, 561, 423. 82
     Total cost of permanent work to June 30, 1937--------                                                   10, 491, 745.91
Minus accounts payable June 30, 1937--------------------                                                           3, 606. 23
     Net total expenditures_______----------                                    _____--                1210,       488, 139. 68
Unexpended balance June 30, 1937_-----                                   ----------------                           51, 086. 58
           Total amount appropriated to June 30, 1937                                -------           1210,      539, 226. 26

    Fiscal year ending June 30                  1933             1934              1935              1936              1937


Cost of new work--------......
Cost of maintenance----------.............
                                             ------------------
                                             $199, 439. 78    $55, 974.11
                                                                              -------------
                                                                                 $69, 804. 55
                                                                                                   $49, 978. 50
                                                                                                   153, 292. 04
                                                                                                                   --------
                                                                                                                     $156, 789. 91

                          .
       Total cost-. ------------ 199, 439. 78                   55, 974. 11       69, 804. 55      203,
                                                                                                      270.
                                                                                                         54           156, 789. 91
Total expended......-----------               133, 133. 84   -254, 368. 64     -240, 681.88        210, 154. 21       153, 509. 36
Allotted---..........-.-......               -34, 116. 83     -94, 299. 70     -180, 823. 48        69, 978. 50      -26, 000. 00

Balance unexpended July 1, 1936__ ________________-    ____                                                       $230,595.94
Deductions on account of revocation of allotment----------                                                          26, 000. 00
           Net. amount to be accounted for-.. __-.__                                -____-_---         -__        204, 595.94
Gross        amount         expended--------                         __--____                 $153, 584.36
Less reimbursements                     collected----------------------                              75. 00
                                                                                          -                        153, 509. 36
      Balance unexpended June 30, 1937________  -_______      _                                                     51, 086. 58
Outstanding liabilities June 30, 1937____---- - __--$740.98
Amount covered by uncompleted contracts-------------11, 907. 84
                                                                                                                    12, 648. 82

           Balance available June 30, 1937___                                                                       38, 437.76
Amount (estimated) required to be appropriated for completion
of existing project - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 41, 200. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance -- _-------------                                 --------                   300, 000. 00
1 Includes $49,978.50 Emergency Relief funds.
2 In addition $23,935.71 was expended from contributed funds.
 $ Exclusive of available funds.
                                   2. THIMBLE SHOAL CHANNEL, VA.

   Location.--Thimble Shoal lies in the channel between Hampton
Roads and the ocean, and is 20 miles northeast of the center of Nor-
              RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                                                     429
folk Harbor, extending southeasterly 9 miles from a point 11/4 miles
east of Thimble Shoal Lighthouse toward the entrance to Chesapeake
Bay. (See U. S. Coast and Geodetic Survey Chart No. 1222.)
   Previous projects.-Adopted by River and Harbor Act of June 25,
1910. The cost and expenditures on the original project prior to the
commencement of operations under the existing project were $333,-
608.88 for new work. For further details see page 470, Annual Re-
port for 1932.
   Existing project.-This provides for dredging a channel 9 miles
long, 750 feet wide, and 40 feet deep at mean low water. Under
ordinary conditions the mean tidal range is 2.6 feet and the extremes
2 and 3 feet. The extremes of irregular fluctuation, due to com-
bined wind and tides, referred to mean low water, are -2 feet and
+9.5 feet.
   The estimate of cost for new work, revised in 1928, was $2,325,000,
exclusive of amounts expended on previous projects. The latest
(1928) approved estimate of cost for annual maintenance is $50,000.
   The existing project was adopted by the River and Harbor Act
of August 8, 1917 (H. Doc. No. 140, 65th Cong., 1st sess.). The
latest published map is in House Document No. 551, Sixty-first Con-
gress, second session.
   Terminal facilities.-For description of the terminal facilities for
these points see this heading under "Norfolk Harbor" and "Channel
to Newport News, Va."
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
l)leted in 1929 at a saving of $41,227 under the estimated cost. The
controlling depth in August 1936 was 38.5 feet at mean low water.
The total costs and expenditures have been $2,660,742.38, of which
$2,283,772.56 was for new work and $376,969.82 for maintenance.
   Proposed operations.-An allotment of $100,000, made during July
1937, will be applied to maintenance dredging with United States
hopper dredge during the period March to June 1938.
   The additional sum of $100,000 can be profitably expended during
the fiscal year ending June 30, 1939, to be applied to maintenance
dredging with United States hopper dredge, July to October, 1938.
                                   Cost and financial summary

Cost of new work to June 30, 1937 _____-__---- __------__                                    $2, 617, 381.44
Cost of maintenance to June 30, 1937_-----------------_______-                                   376,969.82
      Total cost of permanent work to June 30, 1937_____- ___                                  2, 994, 351.26
Net total expenditures-----------------------------------                                      2, 994, 351. 26
Total amount appropriated to June 30, 1937--------------_____________                          2, 994, 351. 26

         Fiscal year ending June 30              1933         1934             1935         1936           1937

Cost of new work. .... . . .---------
                               ---------.--.             i_ _ ._ __. _- -----     .     .   .     . ...........
Cost of maintenance-----------------         $20, 510. 71 ----------- $89, 428.80       $2,411. 75 ------------
Total expended_      -----------------         20, 571. 97 -----------     63, 708.97   28, 131. 58   ------------
Allotted----.-------------------- ---
                                  _50,            000.00   $70,500.00 --.-.-             8, 148.74 .....
430      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------   $100, 000. 00
Amount available for fiscal year 1938-    ._,-------            100, 000. 00

Amount that can be profitably expended in fiscal year ending
  June 39, 1939, for maintenance    1    ------------           100, 000. 00
  1 Exclusive of available funds.

                           3. JAMES RIVER, VA.

    Location.-This river is formed by the junction of the Cowpas-
ture and Jackson Rivers, in Botetourt County, Va., flows easterly
340 miles and empties into Hampton Roads at Newport News, Va.
  (See U. S. Coast and Geodetic Survey Charts Nos. 529, 530. and 531.)
    Previous projects.-Adopted by River and Harbor Act of July 11,
1870. The cost and expenditures were $763,000, including $23,000
appropriated in 1836 and 1852. There is no record showing how
much of the amount was expended for new work and maintenance.
For further details see page 1797 of Annual Report for 1915.
    Existing project.--This provides for a channel 25 feet deep and
300 feet wide from the mouth to Hopewell, 69.2 miles; thence 25 feet
deep and 200 feet wide, following the cut-off route between Hopewell
and the -Richmond    deep-water terminal, 17.8 miles; thence a channel
18 feet deep and 200 feet wide from the deep-water terminal to the.
Richmond lock gates, 3.8 miles; and the removal of the obstruction
in Richmond Harbor known as Trigg Cofferdam.
    Depths of channels are referred to mean low water. The total
length of channel included in the project is 90 8 miles.
    The mean tidal ranges under ordinary conditions for different
parts of the river are as follows: Mouth, 2.7 feet; Jamestown, 1.85
feet; City Point, 2.8 feet; Dutch Gap. 3.5 feet; Richmond, 3.9 feet.
Following are the extreme ranges under ordinary conditions at the
same localities: Mouth, 2.1 to 3 feet; Jamestown, 1.6 to 2.3 feet;
-City Point, 2.3 to 3.2 feet; Dutch Gap, 2.9 to 3.9 feet; Richmond, 3.2
to 42 feet. The ordinary fluctuations of stage at Richmond, due to
floods, are 6 to 12 feet above mean low water. The extreme fluctua-
tions are 16 to 32 feet. The flood heights, below Richmond diminish
rapidly, the extreme, according to available information, being about
11 feet lower at Dutch Gap, 14 miles below, and 17 to 18 feet lower
20 miles below.
    The estimate of cost for new work, revised in 1930, exclusive of the
amount expended on previous projects, is $7,630,000. The latest
  (1930) approved estimate of cost for annual maintenance is $100,000.
    The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for the excavation
of a channel 22 feet deep at mean low water from the mouth to
Richmond and the construction of spur and training dikes (S. Doc.
No. 147, 47th Cong., 1st sess.) ; the act of June 13, 1902, provided for
extending the improvement to the head of navigation at the Rich-
mond lock gates (H. Doc. No. 234, 56th Cong., 1st sess.); the act of
March 3, 1905, provided for forming a turning basin by widening
the channel at Richmond (H. Doc. No. 234, 56th Cong., 1st sess.);
the act of July 3, 1930 (H. Doc. No. 314, 71st Cong., 2d sess.), pro-
vided for the present dimensions of the project; the act of August
          RIVERS AND HARBORS-NORFOLK,         VA., DISTRICT       431
26, 1937 (Rivers and Harbors Committee Doc. No. 68, 74th Cong.,
1st sess.), provided for the removal of the Trigg Cofferdam. For
the latest published maps of the river see the last two mentioned
documents.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
in adopting the modified project, imposed the condition that local
interests shall furnish all necessary rights-of-way and spoil-disposal
areas and give assurances satisfactory to the Secretary of War and
the Chief of Engineers that they will provide adequate terminal fa-
cilities and will hold and save the United States free of any and all
claims for damages resulting from the cut-offs across Turkey Island,
Jones Neck, Dutch Gap, and Aiken Swamp, and will provide such
connections as might be necessary for transportation between the sec-
tions of land divided by these cut-offs, and that they will provide,
when necessary, turning basins in the vicinity of the Richmond ter-
minal and in the vicinity of Hopewell. Under date of January 17,
1931, the city council of Hopewell, by resolution, furnished the nec-
essary assurance that when the necessity therefor had been deter-
mined by the War Department necessary terminal facilities and turn-
ing basin would be provided in the vicinity of Hopewell at such lo-
cations and in accordance with such plans as had the approval of the
Secretary of War. By ordinance approved March 17, 1932, the
council of the city of Richmond bound itself to perform the different
items of cooperation imposed by Congress in the act of July 3, 1930,
for the improvement of the waterway between Hopewell and Rich-
mond and authorized the expenditure of such funds as may be neces-
sary to defray the cost of such cooperation.
   The River and Harbor Act of August 26, 1937, in adopting the
modified project (removal of the Trigg Cofferdam) imposed the con-
dition that local interests acquire and transfer free of cost to the
United States all easements and rights-of-way necessary for the
execution of the work. This condition has been complied with.
   Terminal facilities.-The river's commerce at Richmond is handled
at the city-owned terminals, city wharf, and Richmond dock, and at
14 privately owned wharves located within or in the immediate vi-
cinity of Richmond Harbor. Below Richmond the improvement is
served by 42 wharves. The Richmond terminals and wharves, to-
gether with the wharves between Richmond and the river's mouth,
are adequate for the river's commerce. For further details see page
477, Annual Report for 1932.
   Operations and results during fiscal year.-New-work dredging
by contract for the construction of Jones Neck Cut-off Channel
was commenced on November 2, 1936, and continued to the end of the
fiscal year, when the work was about 75 percent completed. There
were removed 1,722,278 cubic yards of material. The cost of the
work was $426,973 42.
   Maintenance dredging with U. S. dredge Talcott for the removal
of the Trigg Cofferdam from Richmond Harbor was continued to
July 17, 1936, when the work was completed. There were removed
20,137 cubic yards of material. The cost of the work was $16,893.47.
   Under the provisions of section 3 of the River and Harbor Act
of July 3, 1930, dredging was done with a hired dredge on a shoal
       20196--37-pt. 1-- 28
432        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

at the mouth of Deep Creek, Warwick County, a tributary of James
River, removing about 3,000 cubic yards of material. The cost of
the work was $982.73.
   Miscellaneous surveys, inspections, and river-flow studies were
made and liquidated damages refunded during the year at a cost
of $17,598.45, all for maintenance.
   The total cost was $462,448.07, of which $426,973.42 was for new
work and $35,474.65 was for maintenance. The total expenditure
was $383,841.27.
   Condition at end of fiscal year.-The existing project was about
75 percent completed at the end of the fiscal year. The controlling
depth between the mouth and Hopewell was 25 feet; between Hope-
well and Richmond, 17 feet; and in Richmond Harbor, to the New
York Line dock, 17 feet; thence to the lock, 3 feet.
   The work remaining to be done is the removal of about 3,500,000
cubic yards of material from about 18 miles of channel between Hope-
well and Richmond for the completion of the project.
   The total cost, all funds, was $4,746,213.93 from regular funds and
$583,836.53 Public Works funds, a total of $5,330,050.46 for new work,
and $987,378.79 for maintenance, including $982.73 for Deep Creek,
Warwick County, a total cost of $6,317,429.25. The total expenditure
was $6,220,570.30.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $278,753.15, will be applied as follows:
Accounts payable June 30, 1937--      __________--________________--     $96, 858. 95
New work: Completion of Jones Neck Cut-off Channel, under an
  existing contract, 568,238 cubic yards, July to September 1937 -__     150, 000. 00
Maintenance :
    Maintenance of Richmond Harbor, by contract, 57,000 cubic
      yards of material, July to September 1937___---1
                                                    11-1      __          18, 000. 00
    Restoring navigable depth of 18 feet between Richmond and
      Hopewell, with U. S. dredge Mantua, 50,000 cubic yards, April
       to June 1938-------------------------------            ------      13, 894. 20
         Total for all work_    ._____ ______________________    _       278, 753. 15
  The additional sum of $1,461,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
New work:
   Dredging the river to project depth of 25 feet between cut-offs
      and below the Richmond deep-water terminal, by contract,
      July 1938 to June 1939-------------------------------------          $936, 000
Maintenance :
   Widening lower approach to Dancing Point-Swann Point Chan-
      nel, by contract, July 1938 to March 1939 ---------------------        250, 000
   Restoring project dimensions in channels below Hopewell, with
      United States pipe-line dredge, September 1938 to June 1939__          250, 000
   Restoring shoal areas to a depth of 18 feet between the deep-
      water terminal and Richmond, with U. S. dredge Mantua,
      April to June 1939___     __-____-_____            -________-_          25, 000
               Total for all work------------------------                 1, 461, 000
                             Cost and financial summary

Cost of new work to June 30, 1937--------------------------          $6, 093, 050. 46
Cost of maintenance to June 30, 1937_---- -- ___-__-----    -                      79
                                                                              378. r987,

       Total cost of permanent work to June 30, 1937-------            7, 080, 429. 25
  1 Includes$583,836.53 Public Works funds.
                 RIVERS AND HARBORS--NORFOLK, VA., DISTRICT                                                             433
Minus accounts payable June 30, 1937                                      ----        ----------                 $96, 858. 95

     Net total expenditures -    -__________________------                                                  1 6, 983, 570. 30
Unexpended balance June 30, 1937----------------------------                                                     278, 753. 15

          Total amount appropriated to June 30, 1937                                      _________           7, 262, 323.45

    Fiscal year ending June 30                  1933               1934            1935              1936            1937


Cost of new work......-.........             $281, 477. 36     $628, 002. 82          502. 22
                                                                                 $65, 816.40      ---,   0.        $426, 973, 42
Cost of maintenance.----------                 22, 389. 42       132, 315. 90    153, 816.40    $116, 510. 95        35, 474. 65
       Total cost--------------         --    303, 866. 78      760, 318. 72     219, 318. 62    116, 510. 95       462, 448. 07

Total expended...------------        ----     430, 081. 17      543, 452. 17     326, 478.90       98, 424. 58      383, 841. 27

Allotted------.........----------------       462, 068. 95      761,159. 84       42, 712.68     174, 999. 25       459, 982. 73

Balance unexpended July 1, 1936 -----------    -      ________                                                   202, 611.69
_Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936___----------------------------------                                                       600,000. 00
      Amount to be accounted for __________.... ______--
                                                    -----                                                        802, 611, 69
Deductions on account of revocation of allotment___------_                                                       140, 017. 27

      Net amount to be accounted for--________                                                  __--             8___--
                                                                                                                 662, 594. 42
Gross amount expended__-------------------------                                       $384, 099. 19
                             ----
Less reimbursements collected________  -     __- -                                      -257.     92
                                                                                                                 383, 841. 27

Balance unexpended June 30, 1937-------- -------------                                                ----       278, 753.15
.Outstanding liabilities June 30, 1937--------------                                        7, 765. 18
.Amount covered by uncompleted contracts--------                                          239, 077. 39
                                                                                                                 246. 842. 57

Balance available June 30, 1937_                                                                                  31, 910. 58
.Amount (estimated) required to be appropriated for completion
  of existing project ----   - - -------   ---- -------                                                          997, 000. 00
SAmount  that can be profitably expended in fiscal year ending
   June 30, 1939:
     For new work 2 - - - - - - - - - - - - - -- - - - - - - - -- - - - - - - - - - - - - - - -                  936, 000. 00
     For maintenance 2- - - - - - - - - - - - - - - - - - - - - -- - - - - - __
                                                                             - - - - - - - - - - -
                                                                                                                 525, 000. 00
          Total 2- - - - - - - - - - - - - - - - - - - - - - - - - - -   --- -- --- -- ---- -- -- --
                                                                                                              1, 461, 000. 00
   21Includes $583,836.53 Public Works funds.
     Exclusive of available funds.

                                     4. WILLOUGHBY                       CHANNEL, VA.

   Location.-This channel is located in Hampton Roads and extends
from deep water in Hampton Roads to the entrance to Willoughby
Bay. (See U. S. Coast and Geodetic Survey Charts Nos. 400 and
1222.)
   Existing project.-This provides for dredging a channel 10 feet
deep at mean low water, over a bottom width of 300 feet, from deep
water in Hampton Roads to a point opposite the extreme tip of
Willoughby Spit. Under ordinary conditions the mean tidal range
is 2.7 feet and the extremes -2 and + 9.5 feet.
   The estimate of cost for new work made in 1929 was $8,500. The
latest (1929) approved estimate for annual cost of maintenance is
$500.
434         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The existing project was adopted by the River and Harbor Act.
of July 3, 1930 (H. Doc. No. 507, 70th Cong., 2d sess.). The latest.
published map is in the project document.
   Terminal facilities.-A ferry wharf owned by the Chesapeake
Ferry Co. and used by its ferries operating between Willoughby Spit
and Old Point Comfort, is the only commercial wharf located on
Willoughby Spit. (For further details see H. Doc. No. 507, 70th
Cong., 2d sess.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1931. The controlling depth at the last examination, March 1937,
was 7.5 feet at mean low water. The total cost and expenditures
were $8,500, all for new work.
   Proposed operations.-An allotment of $5,000 made during July
1937 will be applied to maintenance dredging by contract, 11,300 cubic
yards, September 1937.
   It is believed that no funds can be profitably expended during the
fiscal year ending June 30, 1939, as it is expected that the work con-
templated will provide for the needs of navigation until a later date.
                                  Cost and financial summary

Cost of new work to June 30, 1937--___--   -     _____--___________ $8, 500
Cost of maintenance to June 30, 1937_______________________________

       Total cost of permanent work to June 30, 1937__________________                          8, 500
Net total expenditures-----------   --------------------------------                            8, 500
Total amount appropriated to June 30, 1937_________________________                             8, 00

        Fiscal year ending June 30           1933           1934      1935               1936   1937


Cost of new work...----------------
Cost of maintenance .........           I
Total expended------------------------------------                               -   -

       -----------------------------------
Allotted_                           __              -----    $5,000   -$5, 000


Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------_--------------------------------------$5, 000
Amount available for fiscal year 1938------------------------------- 5, 000
                                  5. HAMPTON CREEK, VA.

  Location.--This creek is a tidal estuary of Hampton Roads, located
entirely within Elizabeth City County, Va. It is about 3 miles in
length, flows in a southerly direction, and empties into Hampton
Roads about 1.5 miles west of Fort Monroe. (See U. S. Coast and
Geodetic Survey Charts Nos. 400 and 1222.)
  Previous projects.-Adopted by River and Harbor Act of June
18, 1878. The cost and expenditures were $12,000 for new work.
For further details see Annual Reports for 1878 and 1879, pages 72
and 85, respectively.
   Existing project.-This provides for dredging a channel 12 feet
deep from the vicinity of Old Point Comfort across Hampton Flats.
and up the creek to Hampton Highway Bridge at Queen Street,
          RIVERS AND HARBORS--NORFOLK, VA., DISTRICT                    435
with a width of 200 feet in the outer portion of the channel and a
width of 150 feet in the creek, suitably widened at the bends. Under
-ordinary conditions the mean tidal range is 2.6 feet and the extremes
  -2 feet and +9.5 feet.
    The estimate of cost for new work revised in 1935 is $88,000. The
latest (1.935) approved estimate for annual cost of maintenance is
 $3,000.
    The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for a channel
9 feet deep across the bar at the mouth, varying in width from 300
feet at outer end to 200 feet at the inner end, and a channel of the
same depth and 200 feet wide from the mouth of the creek to Hamp-
ton Highway Bridge (Annual Report for 1889, p. 974), and the act
of August 30, 1935, provided for the present dimensions of the project
  (Rivers and Harbors Committee Doc. No. 34, 72d Cong., 1st sess.).
'The latest published map is in the last-mentioned document.
    Local cooperation.-Compliedwith March 11, 1937.
    Terminal facilities.-There are about 30 wharves located on
Hampton Creek, with a total frontage of about 3,000 feet. None of
the wharves has direct rail connection but are connected to the streets
of Hampton with the highways of the locality. Most of the wharves
are privately owned and are utilized in connection with local enter-
prises. One public wharf owned by the county of Elizabeth City,
topen to the public without charge, and a wharf owned by the Hamp-
ton Yacht Club are utilized without charge by visiting yachts. The
facilities are considered adequate for existing commerce.
    Operation and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was about
12 percent completed at the end of the fiscal year. The controlling
depth at the end of the fiscal year was about 8 feet across the bar at
the mouth and 9 feet in the creek.
    The work remaining to be done is dredging, authorized by the
River and Harbor Act of 1935. The total cost and expenditures have
been $10,000 for new work.
    Proposed operations.-An allotment held in reserve, $78,000, to-
:gether   with $40,000 to be contributed by local interests, will be
applied to new work dredging, by contract, September 1937 to
February 1938.
    It is believed that no funds can be profitably expended during
the fiscal year ending June 30, 1939, as it is expected that the work
contemplated will provide for the needs of navigation until a later
date.
                        Cost and financial summary
Cost of new work to June 30, 1.937----      -----------------        $22, 000
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937___-- _______     22, 000
Net total expenditures--------------------------------------         22, 000
Total amount appropriated to June 30, 1937 -----------------____     22, 000

Amount (estimated) required to be appropriated for completion of
existing project _-----------------------------------------------    78, 000
436      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

6. CHANNEL FROM PHOEBUS, VA., TO DEEP WATER IN HAMPTON:
                         ROADS

   Location.-The channel parallels the west shore of the Fort Mon-
roe Military Reservation and leads from deep water in Hampton
Roads to the Phoebus water front at the mouth of Mill Creek. (See
U. S. Coast and Geodetic Survey Charts Nos. 400 and 1222.)
   Existing project.-This provides for a channel 12 feet deep and
150 feet wide from deep water in Hampton Roads to the Phoebus
water front, a distance of about three-fourths of a mile. Under
ordinary conditions the mean tidal range is 2.6 feet. The extremes
of irregular fluctuation referred to mean low water due to combined
effect of wind and tides are-2 feet and + 9.5 feet.
   The estimate of cost of new work made in 1935 is $9,800. The
latest (1935) approved estimate of cost for annual maintenance is
$1,200.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 33, 72d
Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-Complied with January 13, 1937.
   Terminal facilities.-Two wharves, with a combined frontage of{
about 1,000 feet, are located on the Phoebus water front. Three
Government owned and maintained wharves are located on the Fort
Monroe Reservation along the east side of the channel and are used
solely by the military authorities. A ferry slip, utilized by the
ferries operating between Willoughby Spit and Old Point, is located
on the Government reservation just above the Government-owned
wharves. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-New work dredging, by
contract, for the completion of the project was performed between
April 19 and May 22, 1937. There were removed 36,174 cubic yards
of material from 2,300 feet of channel.
   The total cost and expenditure was $11,500, all for new work, not
including $1,199.57 from contributed funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in May 1937. The controlling depth at the end of the fiscal
year was 12 feet. The total cost and expenditures have been $11,500.
In addition $1,199.57 was expended from contributed funds.
   Proposed operations.-No funds are available and no operations.
are proposed during the fiscal year 1938.
   It is believed that no funds can be profitably expended during
the fiscal year ending June 30, 1939, as the condition of the channel
is expected to meet the needs of navigation until a later date.
                         Cost and financial summary

                             UNITED   STATES   FUNDS


Cost of new work to June 30, 1937     _____            ____            $11, 500:
Cost of maintenance to June 30, 1937_
      Total cost of permanent work to June 30, 1937-------------        11, 500
Net total expenditures -------    -        -   -       -     -     -    11, 500
Total amount appropriated to June 30, 1937__     -------------          11, 500
                   RIVERS AND .HARBORS-NORFOLK, VA., DISTRICT                                                                                       437

                        Fiscal year ending June 30                                      1933          1934             1935            1936         1937


Cost of newwork---....--- ---------------- ---------------- --------------- ---------- $11, 500
Cost of maintenance ...................................................
Total expended_-              ----------------------------------------------------------------
                                _                                                                                                                    11, 500e
Allotted --------                             --------------------------
                                 -------...........                                            --------           --------          --------         11,50


Amount allotted from War Department Appropriation Act approved
May 15, 1936-- ------------------------------------------------                                                                                $11, 500
     Gross amount expended ------------------------------------                                                                                  11, 500
                                                      CONTRIBUTED             FUNDS


Cost of new work to June 30, 1937--____________________________                                                                            1 199. 57
                                                                                                                                          $1,
Cost of maintenance to June 30, 1937    -

           Total cost of permanent work to June 30, 1937                                                                                        , 199. 57
                                                                                                                                               1--------------
Net total expenditures------------------------------------------                                                                                , 199. 57
Unexpended balance June 30, 1937__-       --___-   -__       __-___-                                                                              300.43

           Total amount contributed to June 30, 1937_______________                                                                            1, 500.00

                 Fiscal year ending June 30                                  1933        1934                   1935            1936                1937


Cost of new work ....---------------------------------------------------------                                                                   $1, 199. 57
Cost of maintenance ..-                  -         -
                                         ------------------- - -----------
                                                                       , ......                           -                  --------
                                                                                                                                 --   ,                    -
Total expended___                                                                                         -1,                                        199. 57
Contributed...              ..--------------------------------------------------------------                                                      1,500. 00


Amount contributed_________                                     __     --------------------------
                                                                            __                                                            $1, 500. 00
Gross amount expended----- -----                                     ___1,                                                                    199. 57
          Balance unexpended June 30, 1937_____-----                                                 ___--------                                 300.43

        CONSOLIDATED COST AND FANANCIAL SUMMARY FOR PHOEBUS CHANNEL, VA.

Cost of new work to June 30, 1937____________________________ $12, 699. 57
Cost of maintenance to June 30, 1937___

          Total cost of permanent work to June 30, 1937-------------                                                                      12, 699. 57
Net total expenditures-----------------------------------------12, 699. 57
Unexpended balance June 30, 1937--------------------------------   300.43

           Total amount appropriated and contributed to June 30, 1937-                                                                    13, 000. 00

           Fiscal year ending June 30                           1933             1934              1935                      1936                 1937


Cost of new work .....
                   -------   .      .......--------
                                               ...                                                                                              $12, 699. ST
Cost of maintenance----__----------       -------------                                                                                           -----
Total expended.-----------                  -        -           -           -----------------                                                   12,699. 57
Allotted and contributed_ _---_
                           _                       ----------                              I,_,
                                                                                            _                    ------------                    13, 000. 00


Amount allotted from War Department Appropriation Act approved
May 15, 1936       -     ------------
                            -     -     -      -    -    -   _$11, 500.00
438         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                    ___
Amount contributed -----      __-__   -----------------              $1, 500. 00

      Amount to be accounted for_                                        000. 00
                                                                     1_________--13,
Gross amount expended---     __             ------------             12, 699. 57
         Balance unexpended June 30, 1937_______________-_________      300.43
                          7. LAFAYETTE RIVER, VA.

   Location.-This river is a tidal estuary of Hampton Roads, formed
by two branches lying wholly in Norfolk County, Va., and, except
for a small portion of its headwaters, in the corporate limits of
the city of Norfolk. The two branches, each about 2 miles long,
flow from the northeast and southeast and join at a point about 3.5
miles above the mouth. (See U. S. Coast and Geodetic Survey
Charts Nos. 78, 400, 452, 1222, and 1227.)
   Existing project.--This provides for dredging a channel 8 feet
deep and 100 feet wide from deep water in Hampton Roads to the
Hampton Boulevard Bridge, a distance of about 15/s miles. Under
ordinary conditions the mean tidal range is 2.7 feet, and the extremes
of irregular fluctuation referred to mean low water due to com-
bined effect of wind and tides are -2 feet and + 9.62 feet.
   The estimate of cost of new work made in 1937 is $12 000. The
latest  (1937) approved estimate of cost for annual maintenance is
$1,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (Rivers and Harbors Committee Doec. No. 5, 75th
Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-The River and Harbor Act of August 26. 1937,
in adopting the project imposed the condition that (1) no work
shall be undertaken by the United States before local interests have
dredged initially, at their own expense, or have contributed the
necessary funds for dredging initially, a suitable channel of project
dimensions above the shoal at the mouth of the river; (2) local
interests shall furnish, free of cost to the United States, suitable
spoil-disposal areas for the initial improvement and subsequent
maintenance as required; (3) local interests shall release the United
States and its contractors from all claims for damages that may
result from the dredging operations. It is expected that the condi-
tions of local cooperation will have been complied with by July 1,
1938.
   Terminal facilities.-The only wharf of importance on Lafayette
River is an open-pile structure about 300 feet long, owned and
operated by the Norfolk Country and Yacht Club. It is used by
pleasure boats operated by members of the local yacht club and by
visiting members of other yacht associations for landing, obtaining
provisions, and fuel supplies. A number of small landings of light
construction and three small marine railways are located elsewhere
on the river and its tributaries. The wharf and landings are pri-
vately owned and are not open to public use. The existing facilities
are not adequate for present pleasure-boat traffic, and considerable
development to accommodate potential traffic would be required.
Ample room for development is available.
   Operations and results during fiscal year.-None.
            RIVERS AND HARBORS-NORFOLK,                  VA., DISTRICT            439
  Condition at end of fiscal year.- No work has been done under the
existing project. The controlling depth at the end of the fiscal year
was about 6 feet for a width of 100 feet.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  The sum of $12,000 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to new work dredging
for the construction of the channel between Hampton Roads and the
mouth of the river, September-October 1938.
                            Cost and financial summary
Total amount appropriated to June 30, 1937_

Amount (estimated) required to be appropriated for completion of
existing project---------------------------------                 $12, 000. 00
Amount that can be profitably expended in fiscal year ending June
3, 1939, for new work_          _                                   12, 000. 00
                                                                _----------------------------------
                          8. APPOMATTOX RIVER, VA.

   Location.-This river rises in Appomattox County, Va., flows
northeasterly 137 miles, and empties into the James River at Hope-
well, Va. The portion under improvement extends from its mouth
to Petersburg, Va., a distance of 17 miles, which is the length of the
tidal reach. (See U. S. Coast and Geodetic Survey Chart No. 531.)
   Previous projects.-None. Prior to the adoption of a project, the
sum of $22,500, appropriated in 1852, was expended in making a
survey of the river.
   Existing project.-This provides for a navigable channel 80 feet
wide and 10 feet deep at mean low water between the mouth of the
river and Petersburg, the head of navigation, a distance of 11 miles,
and a - turning basin at Petersburg; for a dam at Petersburg and the
excavation for a width of from 200 to 300 feet of a diversion channel
connecting the river above the dam at Petersburg with the river at
a point 21/2 miles below; for about 1.7 miles of levees on the low
grounds between the navigable and diversion channels; for a high-
way bridge and a railway bridge across the diversion channel; and
for other work incidental to the diversion channel. Under ordinary
conditions the mean tidal range is 2 9 feet and the extremes 2.4 and
3.3 feet. There are no records available of the heights of stage due
to ordinary floods. These are estimated at 6 to 8 feet above mean
low water at Petersburg, where the extremes are from 15.6 to 17.1
feet.
   The estimated cost of the navigable channel, revised in 1927, was
$578,136 for new work, and the estimated cost (1909) of the diver-
sion channel and work incident to its construction was $260,000.
The estimated cost of maintenance (1927) of the navigable channel
is $6,500 annually.
   The existing project was authorized by the following river and
harbor acts: The acts of June 13, 1902, and March 3, 1909, provided
for work pertaining to the diversion scheme (H. Doc. No. 139, 56th
Cong., 2d sess.); act of March 3, 1871, provided for a navigable
channel 60 feet wide and 12 feet deep at mean high water (Annual
Reports 1874, Pt. II, p. 54); act of June 25, 1910, provided for
increasing the width of the navigable channel to 80 feet and for the
 .440                      OF ENGINEERS, U. S. ARMY, 1937
         .'"EPORT OF CHIEF OF

maintenance of the diversion works at Petersburg (H. Doc. No. 952,
,60th Cong., 1st sess.); and the act of January 21, 1927, provided
for increasing the depth from 12 feet at mean high water to 10 feet
:at mean low water, an increase of 11/2 feet (H. Doc. No. 215, 69th
Cong., 1st sess.). The latest published map is in House Document
No. 952, Sixtieth Congress,° first session.
    Local cooperation.-Fully complied with.
    Terminal facilities.-All wharves and terminals served by the Ap-
pomattox are situated on the river front at Petersburg. The wharves
.constitute a continuous timber bulkhead on piling and having an
aggregate length of about 2,313 feet. The terminal facilities are
considered adequate for the present river commerce.
    Operations and results during fiscal year.-Miscellaneous surveys
.and inspections were made and liquidated damages refunded during

_penditure
the year at a cost of $3,855.60, all for maintenance. The total ex-
             was $2,522.62.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The navigable channel between the mouth and Point
.of Rocks, a distance of about 3.5 miles, has natural depths ranging
from 10 to 30 feet at mean low water over widths in excess of the
required width of 80 feet.
    The controlling depth in May 1937 was 6 feet at mean low water.
Navigation is practicable throughout the year. The total cost has
been $1,132,032.01, of which $830,151 was for new work and $301,-
:881.01 was for maintenance. The total expenditure was $1,130,301.59,
of which $835,301.59 was applied to the navigable channel and
 $295,000 was applied to the diversion channel.
    Proposed operations.The balance unexpended at the end of the
fiscal year, $26,530.78, will be applied as follows:
Accounts payable, June 30, 1937___-___._-________-------------    $1,730.42
Maintenance:
    Maintenance of the channel at Lieutenant Run and Hares Dike,
      by contract, 20,300 cubic yards, August to September 1937___ 7, 800. 00
    Maintenance of the channel with the U. S. dredge Mantua be-
      tween the mouth and Petersburg, March to April 1938 ___-- 17, 000. 36

        Total for all work       --------------------------------------      26, 530. 78
   The additional sum of $18,000 can be profitably expended during
the fiscal year ending June 30, 1939, to be applied to maintenance of
the channel with U. S. dredge Mantua, between the mouth and
Petersburg, December 1938-January 1939.
                               Cost and financial summary

Cost of new work to June 30, 1937_---------------------           $852, 651. 00
-Costof maintenance to June 30, 1937-----------  ---------------- 301, 881. 01

      Total cost of permanent work to June 30, 1937------------1, 154, 532. 01
Minus accounts payable June 30, 1937-----------------------         1, 730. 42

       Net total: expenditures_--- ----           -----------------       1, 152, 801. 59
-fTnexpended balance June 30, 1937__________---------------         ---       26, 530. 78

        Total amount appropriated to June 30, 1937-------------- 1, 179, 332. 37
               RIVERS AND lA RBORS--NORFOLK, VA., DISTRICT                                                  441

         Fiscal year ending June 30             1933        1934          1935          1936              1937


-Cost of new work .-----------------------------------------------------------                         --- - ----
Cost of maintenance-------------------
                              ........ $3,  978. 40 $9, 684. 54 $8, 484. 50 $42, 129. 91                 $3, 855. 60
Total expended_-.-__.-.-       ---
                              ______    --   -4, 524. 51   9, 170. 71    8, 603. 50   42, 017. 76         2, 522. 6
                                _-2,
Allotted_------------------ -----------         021. 68    8, 954.99    38, 000. 00   36, 000. 00-


Balance unexpended July 1, 1936------------------------------                                   $29, 053. 40
Gross amount expended______                                                                       2, 522. 62

      Balance unexpended June 39, 1937------------ -----                                             26, 530. 78
Outstanding liabilities June 30, 1937-----------------------------                                    1, 855. 42

         Balance available June 30, 1937_____-_________--                        -___                24,675. 36
.Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1--------------                                                          18, 000. 00
  1 Exclusive of available funds.

                                       9. DEEP CREEK, VA.

     Location.-This creek is a tidal estuary of James River, lying
wholly in Warwick County, Va. It is about 3 miles in length, flows
in a southeasterly direction, and empties into James River on its
northerly side about 10.5 miles upstream from the city of Newport
-News, Va. (See U. S. Coast and Geodetic Survey Chart No. 529.)
     E'isting project.-This provides for dredging a channel 6 feet
deep at mean low water from that depth in James River to Hicks
Landing, a distance of 6,000 feet, with widths of 80 feet in James
-River and 50 feet in the creek; a turning basin 6 feet deep, 100
feet wide, and 150 feet long at the upper end; an anchorage basin
6 feet deep and 6.4 acres in area opposite Menchville; and the con-
struction of a timber jetty 800 feet long for the protection of the
north side of the anchorage basin, if and when found necessary.
Under ordinary conditions the mean tidal range is 3 feet. The
extremes of 'irregular fluctuation referred to mean low water due
to combined effect of wind and tides, are -2 feet and +9.6 feet.
     The estimate of cost of new work made in 1937 is $33,600. The
latest (1937) approved estimate of cost for. annual maintenance is
 $2,000.
     The existing project was adopted by the River and Harbor Act o.f
August 26, 1937 (Rivers and Harbors Committee Doc. No. 76, 74th
Cong., 2d sess.). The latest published map is in the project docur
ment.
   . Local cooperation.-The River and Harbor Act of August 26, 193.7
in adopting the project imposed the condition that local interests
shall furnish, free of cost to the United States, suitable spoil-dis-
posal areas for new work and subsequent -maintenance, and give
assurances satisfactory to the Secretary of War that adequate wharf-
age facilities open to all on equal terms will be furnished at the
head of.the channel and at Menchville. It is expected that the cone
ditions of local cooperation .will have been complied with by July 1,
1 9 3g.
442       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Terminal facilities.-Six wharves are located on Deep Creek, of
which two are in fair condition and four are dilapidated. All are
privately owned but are open to the public without charge. None
of the wharves has rail connections but all are served by State high-
ways. The existing facilities are adequate for present business on
the creek, but improvement of the stream would necessitate more and
better facilities, where ample room for such development is available..
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done under the
existing project. The controlling depth at the end of the fiscal year
was about 4 feet for a width of 50 feet to Menchville, and about 1
foot for a width of 50 feet to Hicks Landing.
  Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1938.
  The sum of $28,000 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to new work dredging
for the construction of the channel between James River and Hicks
Landing; a turning basin at Hicks Landing; and an anchorage basin
opposite Menchville, by contract, November 1938 to January 1939.
  It is proposed to defer the construction of the .jetty, estimated to
cost $5,600, until found necessary.
                           Cost and financial summary
Total amount appropriated to June 30, 1937-------------------------

Amount (estimated) required to be appropriated for completion of
existing project--     ------------------------------------          33, 600. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work                 ---------------              28, 000. 00'

                             10. PAGAN RIVER, VA.

   Location.-This river, a tidal stream, rises in Isle of Wiheht CoPmty,
Va., flows northeast 10 miles, and -empties into James River. (See
U. S. Coast and Geodetic Survey Chart No. 529.)
   Previous projects.-Adopted by River and Harbor Acts of June,
14, 1880, and March 3, 1905. The cost and expenditures were $20,-
671.01 for new work. For further details see page 1798 of Annual
Report for 1915.
   Existing project.-This provides for a channel having a least width
of 80 feet and a depth of 10 feet at mean low water between the
wharf of the Smithfield, Newport News & Norfolk Steamship Co.
 (formerly the Old Dominion Steamship Co.) at Smithfield, and the
10-foot contour in James River, a distance of about 62/ miles.
Under ordinary conditions the mean tidal range is 2.7 feet. No data
for extreme ranges of tides are available.
   The estimate of cost for new work, revised in 1920, exclusive of
amount expended on previous projects, was $54,600. The latest
 (1928) approved estimate for annual cost of maintenance is $3,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for widening the
channel at certain bends or angles (H. Doc. No. 397, 60th Cong., 1st
             RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                                                              443
sess.), and the act of March 2, 1919, provided for the present dimen-
sions of the project (H. Doc. No. 591, 64th Cong., 1st sess.). The
latest published map is in the last-mentioned document.
   Terminal facilities.-There are 16 wharves or landings on this
river, of which 14 are at Smithfield, Va., and 2 at Battery Park,
about 1 mile above the river's mouth. The length of dockage avail-
able at Smithfield is about 1,100 feet. At Battery Park the length
of dockage is about 85 feet. The facilities are considered adequate
for present and prospective requirements.
  Operations and results during fiscal year.-Maintenance, by con-
tract, for dredging shoal areas to a depth of 8 feet between the
mouth and Smithfield was performed between March 1 and April 5,
1937. There were removed 58,132 cubic yards of material from 9,750
feet of channel at a cost of $26,455.86.
   The total cost and expenditure was $26,567.50, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1923 at a saving of $23,846 under the estimated cost. The
controlling depth in April 1937, was 8.5 feet at mean low water.
The head of navigation is at Cofer Landing, 9 miles above the mouth.
iNavigation is practicable throughout the year.
   The total cost and expenditures have been $126,767.09, of which
;$30,754.48 was for new work and $96,012.61 was for maintenance.
   Proposed operations.-No operations are proposed during the fis-
cal year 1938.
   It is believed that no funds can be profitably expended during the
fiscal year ending June 30, 1939, as the condition of the channel is
expected to meet the needs of navigation until a later date.
                                 Cost and financial summary
Cost of new work to June 30, 1937--------------------------$51, 425. 49
Cost of maintenance to June 30, 1937------------------------96, 012. 61

       Total cost of permanent work to June 30, 1937                         -------------                  147, 438. 10
Net total expenditures_ ------------------------------------                                                147, 438. 10
Unexpended balance June 30, 1937----------------------------1,                                                   432. 50
        Total amount appropriated to June 30, 1937_____----------                                           148, 870. 60

        Fiscal year ending June 10             1933            1934                 1935             1936          1937


Cost of new work.... ......               . .. .. . ......
Cost of maintenance            --... $13, -------
                      ----------........... 531.97                 -                                             $26, 567. 50

Total expended....-----------------------25,248. 18 --------              ------------            ------------    26, 567. 50
Allotted.---------------------------       -1,086.38
                                          -...            ------------                   $5,000     -$5, 000      28,000.00


Amount allotted from War Department Appropriation Act ap-
   proved May 15, 1936----               ------------------------------                                     $30,000. 00
Deductions on account of revocation of allotment----------------                                                2, 000. 00
      Net amount to be accounted for------------------------                                                   28, 000. 00
Gross amount expended----------------------------------                                                        26, 567. 50
        Balance unexpended June 30, 1937----...........                                                          1.432.50
444         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

11. WATERWAY            FROM NORFOLK, VA., TO THE SOUNDS                                  OF NORTH
                                  CAROLINA
   Location.-This water route extends south from Norfolk, Va., to
Pamlico Sound, N. C. (See U. S. Coast and' Geodetic Survey Charts
Nos. 1227, 1228, 1229, and 1231.) For description see page 492,
Annual Report for 1932.
   Existing project.-This provides for dredging channels to depths
of 10 feet at mean low water, over a least bottom width of 80 feet,
in Deep Creek, Va., Turners Cut, Pasquotank River, and Croatan
Sound, N. C., and maintaining the Dismal Swamp Canal (which
connects Deep Creek and Turners Cut) to a depth of about 9 feet
,over a bottom width of 50 feet. The limiting width of 80 feet ap=
plies to Turners Cut; the channels in Deep Creek and Pasquotank
River have been dredged to depths of 10 feet over bottom widths of
100 feet, while the Croatan Sound Channel has been dredged to a
depth of 12' feet over a bottom width of 200 feet. The project further
provides for the protection of banks in Turners Cut with sheet piling,
and cutting certain sharp points in Pasquotank River, in order to
shorten its course. The component parts of the waterway and their
lengths are about as follows: Deep Creek, Va., 3 miles; Dismal
Swamp Canal, 22 miles; Turners Cut, 4.5 miles; Pasquotank River,.
30 miles; Albemarle Sound, 20 miles; and Croatan Sound, 12.5 miles
a total of 92 miles. The total length of the Dismal Swamp Canal
is about 25 miles, of which a 22-mile portion, a lock canal extending
between Deep Creek, Va., and South Mills, N. C., alone is navigable.
             Data relative to the completed locks included in the project,.

                                     Dimensions          Depth on
                                                         miter sills
Miles
                                                              .from                     Year      Estimated
Nor-         Location                   reatest                        Character of    opened     or actual
folk,                        Width     length                           foundation     to navi-    cost of
Va.                            of availableLift          Up-    Low-                   gation     each lock
                             cham- for fll               per    ,er.
                              ber ' width


                              Feet       Feet     Feet   Feet   Feet
10. 7   Dismal-Swamp Ca-      37           225      12     9       9   Piles in sand     1900        $45, 000
         nal (Deep Creek,                                                and shells.
         Va.).
33.1    Dismal Swamp Ca-      36. 5        225      12     9       9   ....do   .....- 1899           45, 00
         nl  (South Mills,
         N i C.).

   The waterway is nontidal except in Deep Creek, where the mean
=tidal range under ordinary conditions is 3 feet and the extremes 2.3
and 3.2 feet. The extremes of irregular fluctuation in this stream,
due to dombined effect of tides and wind, referred to mean low water,
are about -2 feet and + 9.62 feet. The remaining sections of the
waterway are nontidal and not subject to flood There are at timess
however, variations of 1 to 2 feet in level, due to wind.
o:The estimate of cost for new work, made in 1899, as $274,310;
exclusive of the purchase price of the Dismal Swamp Canal. The
latest (1928) approved estimate of cost for annual maintenance is
$50,000, including $45,000 for operation and care of the waterway.
   The existing project was adopted by the following river and harbor
acts: The act of March 3, 1899, adopted the original route of the
waterway (H. Doc. No. 317, 54th Cong., 1st sess., and Annual Report
for 1896, p. 1086; and H. Doc. No. 131, 55th Cong., 3d sess., and
          RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                        445
Annual Report for 1899, p. 1485); and the act of-March 3, 1925" pro-
vided for the purchase of the Lake Drummond Canal (Rivers and
Harbors Committee Doc. No. 5, 67th Cong., 2d sess.). The latest
published map is found in House Document No. 391, Sixty-second
Congress, second session. Operation and care of.the- waterway was,
included in the project July 1, 1935, under the provisions of the
Permanent Appropriations Repeal Act approved June 26, 1934.
   Terminal facilities.-The northern end of this waterway is in Nor-
folk Harbor, Va., the terminal facilities of which are described under-
this heading in the report on that -improvement. There: are three
small wharves on the Dismal Swamp Canal. There are three landings,
along the Pasquotank River between the south end of the canal and
Elizabeth City. At Elizabeth City, N. C., there are 18 wharves. Ber
low Elizabeth City there are two wharves on the east bank of the
Pasquotank River. The facilities are considered adequate for existing
commerce. For further details see page 493, Annual Report for 1932.
   Operations and results during fiscal year.-Maintenance snagging
and dredging in Dismal Swamp Canal and Pasquotank River wast
performed with the U. S. derrick barge No. 14, between November
10, 1936, and March 31, 1937. There were removed 36,954 cubic yards.
of material. The cost of the work was $10,888.88.
   Maintenance dredging, by contract, for the restoration of proj-
ect dimensions in Deep Creek, and Dismal Swamp Canal at the mouth
of the feeder ditch, was commenced on May 27,E 1937, and continued
to the end of the fiscal year. There were removed 18,791 cubic yards'
of material from 2,300 feet of channel. The cost of the work wa .
$5,334.75.
   Maintenance cost for work done in connection with the operation
and care of the Dismal Swamp Canal was as follows:: Operation,.
$35,502.37; maintenance and repairs, $5,475.18; improvement and
reconstruction, $7,841.40; and emergencies, $278.84.
   The total cost was $65,321.42, of which $16,223.63 :was for main-
tenance and $49,097.79 for the operation and care of the Dismal
Swamp Canal. The total expenditure was $61,113.35.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1903 at a saving of $23,114 under the estimated cost. The
Dismal Swamp Canal was acquired by the United States March -30,
1929, from the Lake Drummond Canal & Water Co., for $500,000.
The controlling depth at the end of the fiscal year was-- feet,-this)
depth occurring in Deep Creek, and Dismal -Swamp Canal.
   The total cost has been $1,555,596.53, of which $751,196.46 (includ-
ing $500,000 for the purchase of the Dismal Swamp Canal)" was for
new work; $82,167.70 'for operating     .andcare, and -$722,232.37 Was
for maintenance. The total expenditure was $1549,693.86: -.
   In.addition, the sum of $338,837.89 was expended between March
30, 1929, and June 30, 1936, on the operation and care of the works
of improvement under the provision of the permanent indefinite
appropriation for such purposes.
   Proposed operations.-The balance unexpended and accounts re-
ceivable (including an allotment of $60,000 made during July 1937)
will be applied as follows:
Accounts payable June 30, 1937_              _
                                            _-___-______-___-------   $6, 541. 04
Maintenance:
    Dredging Deep Creek and Dismal Swamp Canal (mouth of the
      feeder ditch), under an existing contract, 6,000 cubic yards,
      July 1937 ---                   ________-____---,                  700.00
                                                                        ,__,_---___
446              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Maintenance--Continued.
    Dredging, snagging, and bank trimming in Dismal Swamp Canal,
       Turners Cut, and Pasquotank River, with U. S. derrick barge
      Roanoke, November 1937-January 1938-------------------- $10,000.00
    Design of locks at Deep Creek and South Mills, July 1937-
      June 1938-----------------------------------------------3, 000. 00
    Operation of Dismal Swamp Canal:
        Operation of locks and dams, and other works ___________ 35,000.00
               Maintenance and                 repairs_______                     ____               __                     7, 500. 00
               Improvement and reconstruction--------------------------4, 573.47

                  Total for all work                                                                                        8,314. 51
                                                                                                                           6------------------------------
  The additional sum of $840,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
Maintenance:
   Dredging, snagging, and bank trimming in Dismal Swamp Canal,
      Turners Cut, and Pasquotank River, with United States der-
      rick barge, March-June 1939--------------------------------- $25,000
   Construction of new locks in Dismal Swamp Canal at Deep Creek,
      Va., and South Mills, N. C., by contract, July 1938-June 1939___ 750, 000
   Operation of Dismal Swamp Canal:
         Operation of locks and dams, and other works--------------- 37, 200
         Maintenance and repairs----------------------------------- 15, 800
         Improvement and reconstruction-----------------------------6, 000
         Channel work--------- ------------------------------------ 1, 000
         Emergencies ----------------------------------------------      5, 000

                  Total for all work-------------------------------------                                                     840, 000
                                            Cost and financial summary
Cost of new work to June 30, 1937-----------------------------   $751, 196. 46
Cost of maintenance to June 30, 1937________________________   11, 143, 237. 96
      Total cost of permanent work to June 30, 1937---------                                                         1,894, 434.42
Plus accounts receivable June 30, 1937__    -------------- ___                                                              638. 37

     Gross total costs to June 30, 1937                                                                               , 895, 072. 79
                                                                                                                     1--------------
Minus accounts payable June 30, 1937---------                                             -          -__      _---         6, 541. 04

     Net total expenditures--------------------------------                                                      11, 888, 531. 75
Unexpended balance June 30, 1Q37__ ----------------    ____                                                            7,676. 14

           Total amount appropriated to June 30, 1937---------                                                   11, 896, 207.89

          Fiscal year ending June 30                     1933              1934               1935            1936              1937

Cost ofnew work....----                                         --------
Cost of maintenance.......----....-------.......----   $8, 930. 38     $193. 55      $103, 665. 33         $66, 521. 39       $65, 321. 42

                                  8, 865. 18 134. 82 102, 734. 54
Total expended-------------------..........................                                                 66, 669. 01        61, 113. 35
Allotted-------...........----------------             10, 000. 00   46, 999. 56         137, 600. 00       44, 093. 48         8, 500. 00


Balance unexpended July 1, 1936                                                                                        $       2       0
                                                                                                                               2-------------------------
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936 --------------------------------------                                                                8, 500. 00

      Amount to be accounted for___                                                                                           789. 49
                                                                                                                           6_____________---6----6
Gross amount expended -------      __                133.29
                                         -________-$61,
Less reimbursements collected----------------------   19. 94
                                                                                                                           61,113.35

           Balance unexpended June 30, 1937 __---------                                              ---                    7, 676.14
   1 Includes $338,837.89 expended for operation and care from the permanent indefinite
appropriation.
               RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                                               447

Outstanding liabilities June 30, 1937--------------                        $1,952. 93
Amount covered by uncompleted contracts-----------                          6, 278. 75
                                                                                                 $8, 231. 68
     Balance available June 30, 1937------------------------                                      -555. 54
Accounts receivable June 30, 1937-----------------------------                                      638.37

     Unobligated balance available June 30, 1937-------------                                         82.83
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------    --------                                  60, 000. 00

          Balance available for fiscal year 1938---------------------                            60, 082. 83

Amount that can be profitably  expended in fiscal year ending June
                           2- - - - - - -- - - - - - - - - - - - - - - - - - - - - - -
30, 1939, for maintenance                                                                    840, 000.00
  2   Exclusive of available funds.

        12. INLAND WATERWAY FROM NORFOLK, VA., TO BEAUFORT
                            INLET, N. C.
  Location.-The improvement described consists of a sea-level inland
water route approximately paralleling the Atlantic coast between
Norfolk, Va., and Beaufort Inlet, N. C., a distance of 197.91 statute
miles. For description of the waterway see pages 495-497, Annual
Report for 1932. (See U. S. Coast and Geodetic Survey Charts Nos.
1227, 1228, 1231, and 1233.)
   Previous projects.-Partial projects were adopted by River and
Harbor acts of March 3, 1873, March 3, 1879, June 18, 1878, June 14,
1880, March 3, 1881, and September 19, 1890. The cost and expendi-
tures were $292,095.65 for new work and $52,804.35 for maintenance, a
total of $344,900. For further details see page 497, Annual Report
for 1932.
  Existing project.-This provides for an inland waterway with a
depth of 12 feet at mean low water between Norfolk, Va., and Beau-
fort Inlet, N. C., a distance of 197.91 miles, with bottom widths vary-
ing from 90 feet in land cuts to 300 feet in open waters, for the con-
struction of a tidal guard lock in the Albemarle and Chesapeake Canal
at or near Great Bridge, Va., and for the construction, operation, and
maintenance of a suitable bridge across the waterway near Fairfield,
N. C.
   Data relative to the completed lock included in the project is as
follows :

                                     Dimensions            Depth on
                                                           miter silis
Miles
from                                                                                      Year     Estimated
                                        Greatest                         Character of    opened or actual
Nor-          Location          Width   length                           foundation      to navi- cost of
folk,                             of     avail-    Lift Up-       Low-                    gation each lock
Va.                            cham-     able          per        er
                                 ber    for full
                                         width

                                Feet      Feet     Feet    Feet   Feet
12.04    Albemarle and Ches-       75        600    2. 7    (1)    (1)   Piles in sand    1932        $492. 9a2
          apeake Canal                                                     and shells.
           (Great Bridge,Va.)

      116 feet at mean low water.

  The waterway is nontidal except in the Southern Branch of Eliza-
beth River and in Beaufort Inlet, N. C. In the Southern Branch
          20196-37-pt. 1-29
448     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937.

the mean tidal range under ordinary conditions is 2.7 feet and the
extremes are 2.3 and 3.2 feet. The extremes of irregular fluctuation,
due to the combined effect of the tide and wind, referred to mean low
water, are -2 and +9.62 feet. In Beaufort Inlet, N. C., under
ordinary conditions the mean tidal range is 2.6 feet and the extremes
are 2.3 and 3.2 feet.
   The estimate of cost for new work, revised in 1933 was $7,870,600,
exclusive of amounts expended on previous projects, but including
the purchase price of the canal. The latest (1933) approved esti-
mate for annual cost of maintenance is $196,600, including $106,000
for operation and care of the waterway.
   The existing project was adopted by the following river and har-
bor acts: The act of July 25, 1912, adopted the original route of the
Norfolk-Beaufort Inlet section (H. Doc. No. 391, 62d Cong., 2d
sess.); act of August 8, 1917, authorized a change of route in the
Albemarle Sound-Pamlico Sound section, via the Alligator River-
Rose Bay route, and the Pamlico Sound-Neuse River section, via
Pamlico Sound-Brant Shoal-Neuse River route, to Alligator River-
Pungo River route, and Goose Creek-Bay River route, respectively
 (H. Docs. Nos. 1478, 63d Cong., 3d sess., and 1136, 64th Cong., 1st
sess., approved by the Secretary of War Apr. 14, 1919); act of July
18, 1918, changed the Alligator River-Pungo River route (a proposed
land cut connecting the rivers) from a straight line, as approved
by the first modification, to a bent line approaching nearer the town
of Fairfield, N. C. (approved by the Secretary of War on May 15,
1919) ; act of March 4, 1933 (Public, No. 433, 72d Cong.), provided
for the construction of a suitable bridge near Fairfield, N. C. (Rivers
and Harbors Committee Doc. No. 5, 72d Cong., 1st sess.); and the
act of July 3, 1930, authorized the construction of a tidal lock at
Great Bridge at a limit of cost of not to exceed $500,000 (S. Doc. No.
23, 71st Cong., 1st sess.). Operation and care of the waterway was
included in the project July 1, 1935, under the provisions of the
Permanent Appropriations Repeal Act, approved June 26, 1934.
The latest published maps are in the last-mentioned document and
House Document No. 1136, Sixty-fourth Congress, first session.
   Local cooperation.-Fully complied with.
   Terminal facilities.--The north end of this waterway is in Norfolk
Harbor, the terminal facilities of which are described in the report
on that improvement. Between Norfolk and Albermarle Sound
there are 13 wharves or landings. Along the route between Albe-
marle Sound and Pamlico River are 10 wharves. Located upon
waters tributary to the Pamlico River-Neuse River section are 15
wharves, aggregating a frontage of about 600 feet. There are eight
wharves on the section of the waterway from Neuse River to Beau-
fort Inlet, with a combined frontage of about 400 feet. At More-
head City, N. C., there are 27 wharves, their total frontage being
about 500 feet. Contiguous to the harbor at Beaufort, N. C., the
southern terminus of the waterway, there are 46 wharves, their total
frontage being about 1,200 feet. The facilities are considered ade-
quate for existing commerce. For further details, see page 499,
Annual Report for 1932.
   Operations and results during fiscal year.-Maintenance dredging,
by contract, for the restoration of project dimensions in the Southern
          RIVERS AND HARBORS-NORFOLK. VA.. DISTRICT                  449
Branch and Coinjock Bay was performed between August 17 and
December 5, 1936. There were removed 283,040 cubic yards of mate-
rial from 18,175 feet of channel. The cost of the work was $46,233.35.
   Maintenance dredging under an existing contract for the restora-
tion of project dimensions in Virginia Cut, Currituck Sound, and
North River, was commenced on May 26, 1937, and continued to the
end of the fiscal year. There were removed 733,297 cubic yards of
material from 29,930 feet of channel. The work is about 48 percent
completed. The cost of the work was $55,183.60.
   Maintenance work, by contract, for the removal of the New Hol-
land, Higginsport, and Mount Vernon railroad bridge was per-
formed between December 3, 1936, and March 4, 1937. The cost
of the work was $6,782.53.
   Miscellaneous surveys and inspections were made during the year
at a cost of $8,866.45, all for maintenance.
   Maintenance costs for work done in connection with the operation
and care of the waterway were as follows: Operation, $63,249.93;
maintenance and repairs, $27,558.56; improvement and reconstruc-
tion, $31,734.91; and emergencies, $14,613.64.
   The total cost of the work was $254,222.97, of which $117,065.93
was for maintenance and $137,157. 04 for operation and care. All
work was for maintenance, of which $227,280.88 pertains to the
Norfolk district and $26,942.09 to the Wilmington, N. C., district.
   The total expenditure was $188,650.30, of which $161,214.94 was
disbursed by the Norfolk district and $27,435.36 was disbursed by
the Wilmington, N. C., district.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935. The controlling depths at the end of the fiscal year
were as follows: Between Norfolk, Va., and a point 12 miles east of
Belhaven, N. C., 119 miles, 10.5 feet, this depth occurring in Virginia
Cut and Alligator River; and between a point 12 miles east of Bel-
haven, N. C., and Beaufort Inlet, N. C., 78.91 miles, about 11 feet,
this depth occurring in Pungo River.
   The Albemarle and Chesapeake Canal was acquired by the United
States from the Chesapeake & Albemarle Canal Co. on April 30,
1913, for $500,000. Navigation is practicable throughout the year.
   The total costs have been $9,684,712 (Norfolk district, $9,355,218.70,
Wilmington district, $329,493.30) from regular funds (including
$500,000 for the purchase of the Albemarle and Chesapeake Canal),
of which $8,123,213.36 (Norfolk district) was for new work, $1,355,-
033.46 for maintenance (Norfolk district, $1,060,438.92, Wilmington
district, $294,594.54) and $206,465.18 (Norfolk district, $171,566.42,
Wilmington district, $34,898.76) for operating and care. The total
cost from Public Works funds was $80,282.36 for new work (Norfolk
district).
   The total cost from all funds except "operating and care, indefi-
nite," was $9,764,994.36 (Norfolk district, $9,435,501.06, Wilmington
district, $329,493.30), of which $8,203,495.72 (Norfolk district) was
for new work and the balance for maintenance and operating and
care as stated above.
   The expenditures were $9,615,677.54 from regular funds, and
$80,282.36 from Public Works funds, a total of $9,695,959.90, of
450        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

which $9,366,492.08 was disbursed by the Norfolk district, and $329,-
467.82 was disbursed by the Wilmington, N. C., district.
  In addition, the sum of $975,744.25 was expended between May 1,
1913, and June 30, 1936, on the operation and care of the works of
improvement under the provision of the Permanent Indefinite Appro-
priation for such purposes.
  Proposed operations.-The balance unexpended and accounts re-
ceivable (including an expected allotment of $243,000) at the end of
the fiscal year, $436,266.94 will be applied as follows:
Accounts payable June 30, 1937-----_------------           -      $73, 359. 53
Maintenance:
    Dredging in Virginia Cut, North Landing River, Currituck
      Sound, and North River, under an existing contract, 863,700
      cubic yards, July 1937-January 1938 -------------------- 66, 500.00
    Dredging Alligator River, by contract, 988,000 cubic yards,
      August 1937-February 1938      __-------_--------            90, 000. 00
   Removal of rapidly deposited shoaling throughout the waterway
      with U. S. dredge Mantua, July 1937-June 1938------_   -__-  50, 000. 00
    Dredging between Pungo River and Beaufort Inlet, by contract,
      150,000 cubic yards, October-November 1937-------------      30, 000. 00
    Operation of the waterway:
        Operation of locks and dams, and other works                2, 000. 00
                                                                   6-----------
        Maintenance and repairs---------------------------         10, 300. 00
        Improvement and reconstruction---------------------- 54, 107. 41

            Total for all work     -------------                         __--436, 266.94
  The additional sum of $221,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
Maintenance :
    Dredging channels to project dimensions in shoal places between
      Norfolk and Pungo River, with U. S. dredge Mantua July 1938-
      June 1939------------      -     -----------------            $75,000
    Dredging channels to project dimensions in shoal places between
      Pungo River and Beaufort Inlet, by contract, October-November
      1938    ------------------------------------------------- 30, 000
      Operation of the waterway:
          Operation of locks and dams, and other works.-------------62, 800
          Maintenance and repairs     -------------------------      35, 100
          Improvement and reconstruction-----___- ___-- __-  -       12, 500
          Channel work-------------------------------------------        600
          Emergencies---------       -------------------------------  5, 000
            Total for all work      --------------------------------- 221, 000
                            Cost and financial summary

Cost of new work to June 30, 1.937-----------------------1 $8, 495, 591. 37
Cost of maintenance to June 30, 1937 .__________--____     2 2, 590, 047. 24

      Total cost of permanent work to June 30, 1937----------             11, 085, 638. 61
Plus accounts receivable June 30, 1937-____----------_____                      4, 325. 07
      Gross total costs to June 30, 1937_-____----- ___             __    11, 089, 963. 68
Minus accounts payable June 30, 1937------_-------                             73, 359.53
     Net total expenditures---------------------------                    11, 016, 604. 15
Unexpended balance June 30, 1937_----------
                                  _------__--___                               188, 941.87
        Total amount appropriated to June 30, 1937-- ---------           111, 205, 546. 02
21 Includes $80,282.36 Public Works funds.
   Includes $975,744.25 expended for 0. & C. from the permanent indefinite appropriation.
                    RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                                                               451

     Fiscal year ending June 30                    1933             1934           1935           1936                 1937


Cost of new work-------------................    $19, 452. 25 --------------     $41, 369.73    $38, 912. 63   ..........----------....
Cost of maintenance---.............              271, 662. 93    $460, 635. 60   156, 217. 94   298, 660. 58         $254, 222. 97

        Total cost--       --------------        291, 115. 18     460, 635. 60   197, 587. 67   337, 573. 21         254, 222. 97

Total expended...--------------..............    321, 978. 98     370, 384. 37   288, 340.09    366, 207. 60          188, 650. 30

Allotted......-------------------                325, 760. 34     539, 218. 74   444, 100. 00    68, 277. 89         218, 000. 00



Balance unexpended July 1, 1936---------------------------                                                 $159, 592. 17
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936----------------------------------------                                                   218, 000. 00

      Amount to be accounted for----------------------------  377, 592.17
Gross amount expended---------------------------------------188, 650. 30
      Balance unexpended June 30, 1937-------- -----------    -                                                188, 941.87
Outstanding liabilities June 30, 1937-------------- $11, 425.22
Amount covered by uncompleted contracts----------- 160, 520. 14
                                                                                                               171, 945. 36
     Balance available June 30, 1937--------------------------                                                  16, 996.51
Accounts receivable June 30, 1937-------------------- ---------                                                  4, 325. 07
     Unobligated balance available June 30, 1937---------                                       ----            21, 321. 58
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937---------------------------------                                                   185, 000. 00
Balance available for fiscal year 1938-------------------------                                                206, 321. 58
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 3-----------------------------                                                 221, 000. 00
    $Exclusive of available funds.

                                                13. KNOBBS CREEK, N. C.

   Location.-This creek is a nontidal fresh-water stream emptying
into Pasquotank River from the west, about 18 miles above its mouth
in Albemarle Sound. (See U. S. Coast and Geodetic Survey Chart
No. 1228.)
   Existing project.-This provides for a channel 10 feet deep at mean
low water, from that depth in Pasquotank River to the Norfolk
Southern Railroad bridge, 100 feet wide in Pasquotank River and
generally 60 feet wide in the creek, with a turning basin in the
sharp bend opposite the plant of the Chesson Manufacturing Co.
Being a branch of Pasquotank River, Knobbs Creek is affected by
the wind tides which influence that stream and Albemarle Sound.
In extreme cases the water rises 4 to 5 feet above mean low water,
but the average fluctuation of the water surface is about 1 foot.
   The estimate of cost for new work, made in 1927, was $79,000. The
latest (1927) approved estimate for annual cost of maintenance is
$500.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 102, 70th Cong., 1st sess.) The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are eight wharves with an aggregate
available frontage of 1,200 or 1,400 linear feet located on Knobbs
452                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Creek. The existing wharves are considered adequate for the present
commerce.
   Operation and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth in February 1933, was 10
feet. The head of navigation is the upper Norfolk Southern Rail-
road bridge, about 1.4 miles above the mouth.
   The total cost and expenditures have been $80,500, all for new
work.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  The sum of $7,500 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to maintenance dredg-
Ing, snagging, and bank trimming, United States derrick barge,
November 1938-January 1939.
                                                     Cost and financial summary

Cost of new work to June 30, 1937----------------                                                                                              ______$80, 500
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937------- __       -
                                                                  -___                                                                                                   80, 500
Net total expenditures ---         -____-_____----80,                                                                                                                        500
Total amount appropriated to June 30, 1937______________      ___                                                                                                        80, 500

                    Fiscal year ending June 30                                             1933               1934                    1935                1936               1937


Cost of new w ork ........................... ......                                                                  ................. ................................
Cost of maintenance...............................................................
        maintenance-
            w r              _k---------- -         -                           ----                         --                                       --- ---------
Total expended.-            ------------------                                     -   -    -   -   -   --    -   -   -   -   -   -    -   -   -   --    -   -   -   -   -   -   -   -   -


Allotted-.................. .............................--------------------------------...--------------------                      $5, 000           -$5, 000


Amount than can be profitably expended in fiscal year ending June 30,
1939, for maintenance_________  -------------------------------- $7, 500
                                                 14. MEHERRIN RIVER, N. C.

   Location.-Rises in Lunenburg County, Va., flows in a southeast-
erly direction a distance of about 126 miles and empties into the
Chowan River, N. C., at a point about 39 miles above Albemarle
Sound, N. C. (See U. S. Geological Survey, Winton quadrangle,
N. C.)
   Previous projects.-Adopted by River and Harbor Act of August
2, 1882. The total cost and expenditures were $4,584.53 for new work.
For further details see page 1802 of Annual Report for 1915.
   Existing project.-This provides for a channel 10 feet deep from
the mouth to the State highway bridge at Murfreesboro, with a
cut-off channel through Devils Elbow, a distance of about 10.5 miles;
80 feet wide through the cut-off, and 100 feet wide elsewhere; and
a turning basin of the same depth, 300 feet wide and 500 feet long
at Murfreesboro. The entire stream is nontidal and, except during
freshets, its water surface rises and falls according as the winds raise
or lower the water level of Albemarle Sound. Freshets cause varia-
tions of water level of from 3 to 4 feet in the navigable portion of
the river,
           RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                      453
   The estimate of cost for new work, revised in 1935, exclusive of
amount expended on previous projects, is $46,000. The latest (1935)
approved estimate of cost for annual maintenance is $3,500.
   The existing project was adopted by the following river and har-
bor acts: The act of March 2, 1907, provided for the removal of
shoals and obstructions, so as to make the river safely navigable for
vessels of less than 7 feet draft between the mouth and Murfreesboro
 (H. Doc. No. 137, 59th Cong., 1st sess.); and the act of August 30,
1935, provided for the present dimensions of the project (Rivers and
Harbors Committee Doc. No. 43, 74th Cong., 1st sess.). For the
latest published map of the river, see the last-mentioned document.
   Local cooperation.-The act of August 30, 1935, in adopting the
modified project imposed the condition that local interests shall
furnish free of cost to the United States suitable spoil-disposal
areas for new work and subsequent maintenance and lands and
rights-of-way needed for the turning basin and cut-off channel.
Negotiations are under way for easements for lands and right-of-
way needed for the turning basin and cut-off channel. Compliance
is expected by July 1, 1937.
   Terminal facilities.-There are seven private wharves on Meherrin
River, four of which are located at Murfreesboro. All are of timber
construction with pile foundation and plank decking. The total
berthing space at Murfreesboro is approximately 130 feet. Smith-
Douglas Co., fertilizer manufacturers, operate two of the wharves,
with large mixing plant, warehouse, office, and storage facilities.
This installation was recently constructed at a cost of $40,000. The
Standard Oil Co. has a wharf about 200 yards downstream from
the Smith-Douglas terminal. Storage tanks, with total capacity of
48,000 gallons, are supplied by pipe lines running from the wharf.
The wharfage facilities are considered adequate for existing com-
merce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 4
percent completed. The controlling depth in February 1935 was 10
feet. The head of navigation is at Skinners Landing, 21 miles above
the mouth.
   The work remaining to be done is dredging a cut-off channel
through Devils Elbow to a depth of 10 feet and 80 feet wide, and a
turning basin 300 feet wide and 500 feet long to the same depth at
Murfreesboro.
   The total cost and expenditures on the existing project were
$46,754.49, of which $1,932.88 was for new work and $44,821.61 was
for maintenance.
   Proposed operations.-An expected allotment ($40,000) will be
applied to new work dredging for the construction of a cut-off
channel and a turning basin, by contract, March-June 1938.
   The additional sum of $15,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
Maintenance :
    Maintenance of the channel between the mouth and Murfreesboro,
      by contract, April-May 1939 .___-       -       ___------- ____ $10, 000
    Maintenance snagging, and bank trimming between the mouth and
     Murfreesboro with United States derrick barge, November 1938__     5, 000
          Total for all work --         ----
                                   _-----..    -   ----------------    15, 000
454          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                      Cost and financial summary
Cost of new work to June 30, 1937- ------                           517. 41
                                                                $--------------------6,
Cost of maintenance to June 30, 1937--------------------------44, 821. 61
      Total cost of permanent work to June 30, 1937-------------51, 339. 02
Net total expenditures---     -------------------------------- 51, 339. 02
Total amount appropriated to June 30, 1937---------------------  51, 339. 02

         Fiscal year ending June 30             1933            1934           1935        1936           1937

                                                     ------------
Cost of new work.......................--------- ..----               ,-------------------------------
Cost of maintenance-----------                                   : $12,373.05
                                         "-----$2,754.49-----------              $3, 926.95"
Total expended----------------             -2,977.     99---               -12, 373. 05   3, 926.95   -----------
Allotted- ........----------------------       2,754.49        $4,000.00     12, 300.00--------------------


Amount (estimated) required to be appropriated for completion of
existing project ----------------                                $40, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance----------------------------------15, 000. 00

                                 15. EDENTON HARBOR, N. C.

   Location.-This harbor is located on the northerly side of Albe-
marle Sound near its westerly end, and in front of the city of Eden-
ton. (See U. S. Coast and Geodetic Survey Chart No. 1228.)
   Existing project.-This provides for a channel 12 feet deep at
mean low water over a bottom width of 150 feet between the 12-foot
contour in Edenton Bay and the foot of Broad Street, Edenton, a
distance of about 4,000 feet, and channels of the same cross section,
leading from the main channel, along the water front to the east and
west for distances of about 900 and 1,600 feet, respectively. Under
ordinary conditions the fluctuation of the water surface is about 1
foot, respectively, above or below mean low water, but under ex-
treme conditions the water may rise as much as 4 or 5 feet above
mean low water.
   The estimate of cost for new work, revised in 1930, was $80,000.
The latest (1930) approved estimate for annual cost of maintenance
is $500.
   The project was authorized by the following river and harbor acts:
The act of June 18, 1878, provided for the original channel improve-
ment and a turning basin near the wharves at Edenton (Annual
Report for 1879, p. 696); act of July 5, 1884, extended the original
project and added a triangular turning basin of about 8 acres in
area at the junction of the two channels (Annual Report for 1884,
pp. 1071-1074) ; and the act of July 3, 1930, provided for the present
dimensions of the project (H. Doc. No. 772, 69th Cong., 2d sess.).
The latest published map is found in the last-mentioned document.
   Terminal facilities.-The municipal or public wharves are located
on the improved portion of the harbor and are connected with all
the highways entering the town by the city streets, which are of
hard-surface construction. The Norfolk Southern Railroad has ex-
cellent wharf and freight terminals on the harbor to which its tracks
extend, and where there are adequate facilities for the transfer of
           RIVERS AND HARBORS-NORFOLK,              VA., DISTRICT        455
freight from boats to cars. The Eastern Cotton Oil Co. and several
other concerns have wharves on the water front. All the wharves
of the port are of open-pile or solid-fill bulkhead construction. The
public wharves are open to public use free of charge and all the
other above-mentioned wharves are open to public use at a nominal
charge. The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $6,250 under the estimated cost. The
controlling depth in December 1934 was 10 feet at mean low water.
Navigation is practicable throughout the year. The total cost and
expenditure was $73,750, all for new work.
  Proposed operations.-An allotment of $15,000, made during July
1937, will be applied to maintenance dredging, by contract, Septem-
ber-October 1937.
  It is believed that no funds can be profitably expended during
the fiscal year ending June 30, 1939, as it is expected that the work
contemplated will provide for the needs of navigation until a later
date.
                           Cost and financial summary
Cost of new work to June 30, 1937__---_-- ---     ___------------_     $73, 750
Cost of maintenance to June 30, 1937                                       .....
       Total cost of permanent work to June 30, 1937----------------   73, 750
Net total expenditures   ------
                             ___ ____________
                                      ---                              73, 750
Total amount appropriated to June 30, 1937_-       --                  73,750
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--------------------------------------            15, 000
Amount available for fiscal year 1938-- -------------------------      15, 000
                           16. CASHIE RIVER, N. C.

   Location.-This river, a nontidal stream, rises in Bertie County,
near Kelford, N. C., flows in a general southeasterly direction for
about 57 miles to a point where it intersects the thoroughfare (con-
necting Cashie and Roanoke Rivers), thence in a northeasterly direc-
tion for approximately 7 miles, and empties into the extreme westerly
end of Albemarle Sound.
   Existing project.-This provides for the removal of logs, snags,
and other obstructions between the mouth of the thoroughfare in
Roanoke River and Windsor; the construction of three cut-off chan-
nels 80 feet wide through sharp bends at points 1, 4, and 5 miles
below Windsor, and a turning basin about 1.1 acres in area at Wind-
sor, all to a depth of 10 feet. The river is not subject to floods or
freshets, but its water surface rises and falls according as the winds
raise or lower the water level in Albemarle Sound. The maximum
fluctuation of the water surface is about 4 or 5 feet.
   The estimate of cost for new work, revised in 1937, is $32,000.
The latest (1937) approved estimate for annual cost of maintenance
is $1,200.
   The existing project was adopted by the River and Harbor Acts
of July 3, 1930 (H. Doc. No. 779, 69th Cong., 2d sess.), and August
26, 1937 (Rivers and Harbors Committee Doc. No. 31, 75th Cong.,
456             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

1st sess.), the latter act providing for the cut-off and turning basin.
The latest published map is in the last-mentioned document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
in adopting the modified project imposed the condition that local
interests shall furnish without cost to the United States the necessary
rights-of-way, areas for the disposal of dredged material, and agree
to protect the United States and its contractors against claims for
damages resulting from the dredging and disposal of material. It
is expected that these conditions will have been complied with by
July 1, 1938. Prior conditions have been fully complied with.
   Terminal facilities.-There is 1 public wharf and 4 privately
owned wharves at Windsor, N. C., and 12 between this point and the
thoroughfare. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project is about 22 percent
completed. The controlling depth at the last examination, August
1935, was about 10 feet.
   The work remaining to be done is the construction of a turning
basin at Windsor and three cut-off channels below Windsor.
   The total cost and expenditure was $7,097.66, all for new work.
   Proposed operations.-An allotment of $7,500, made in July 1937
will be applied to maintenance dredging, snagging, and bank trim-
ming, with United States derrick barge Roanoke, February to April
1938.
   The additional sum of $27,000 can be profitably expended during
the fiscal year ending June 30, 1939, and will be applied to new-
work dredging for the construction of a turning basin at Windsor
and three cut-off channels below Windsor, by contract, February to
April 1939.
                                            Cost and financial summary

Cost of new work to June 30, 1937 __-------_----------------                                                             $7, 097. 66
Cost of maintenance to June 30, 1937--                                                                                      --.......

      Total cost of permanent work to June 30, 1937---------------                                                        7, 097. 66
Net total expenditures_-------------------------                                                                          7, 097. 66
Total amount appropriated to June 30, 1937--------      __------ -----                                                    7, 097. 66

           Fiscal year ending June 30                             1933            1934        1935           1936               .1937

Cost of new work- ............... -
Cost of maintenance............- .......- .
                                              ...                     .....   I...-.-.-   $3, 883. 71
                                                                               ---------- ----------
                                                                                                           $3, 213.95 ...........
                                                                                                          ----------- ----------
Total expended ...........--........-..-.--------         -        .- -       ------------   1, 228.83      5, 868. 83              .
Allotted----...........                             ...       .           -----              7, 500. 00     -402. 34


Amount allotted from War Department Civil Appropriation Act,
approved July 19, 1937------------------___                     -----------------              $7,                            500. 00
Amount available for fiscal year 1938              ____________-------------7,                                                 500. 00
Amount (estimated)    required     to be appropriated for completion of
                         -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
existing project ~ - -                                                                         27,                            000.00
Amount that can be profitably expended in fiscal year ending June
                          1 -_- - - - - - - -      - -      -          - -          - - -     -
30, 1939, for new work                           __          ________                          27,                            000. 00
    1
        Exclusive of available funds.
           RIVERS AND HARBORS-NORFOLK, VA., DISTRICT               457
                      17. ROANOKE RIVER, N. C.

   Location.-This stream rises in the Blue Ridge Mountains, west
of Roanoke, Va., and flows southeasterly for about 200 miles to
Clarksville, Va., where it is joined by Dan River, its principal tribu-
tary; and thence, in the same general direction for about 198 miles
and empties into the westerly end of Albemarle Sound, N. C. (See
U. S. Coast and Geodetic Survey Chart No. 1228 and Post Route
Map of North Carolina.)
   Existing project.-This provides for dredging a channel 10 feet
deep and 150 feet wide between the 10-foot contour in Albemarle
Sound and the mouth, a distance of about 0.75 mile; removing ob-
structions between the mouth and Hamilton, N. C., a distance of 62
miles, so as to furnish a channel adequate for vessels navigating the
North Carolina sound; and by dredging, snagging, and regulation,
securing a channel with a least width of 50 feet and a depth of 5 feet
between Hamilton and Weldon, N. C., a distance of 67 miles. Depths
of channels are referred to mean low water. The rise and fall of the
river, resulting from freshets, is from 10 feet to 30 feet for 60 or 70
miles below Weldon, but this fluctuation diminishes toward the
mouth, the variations in water level being from 1 foot to 3 feet in the
last 15 or 20 miles.
   The estimate of cost for new work, revised in 1930, is $315,500.
The latest (1930) approved estimate for annual cost of maintenance
is $4,000.
   The existing project was adopted by the following river and harbor
acts: The act of March 3, 1871, provided for the improvement of the
river between the mouth and Weldon (S. Ex. Doc. No. 23, 42d Cong.,
2d sess., and Annual Report for 1872, p. 726), and the act of July 3,
1930, provided for the entrance channel (H. Doc. No. 211, 70th Cong.,
1st sess.). For latest published maps see page 1110, Annual Report
for 1890, and House Document No. 211, Seventieth Congress, first
sessIon.
   Terminal facilities.--There are nine wharves at Plymouth, N. C.,
and two between this point and Weldon. There are also about 20
warehouses between the mouth of the river and Weldon. The facili-
ties are considered adequate for existing commerce.
  Operations and results during fiscal year.-Maintenance snagging
with U. S. derrick barges No. 14 and Northeast, between Hamilton
and Palmyra, was continued to November 9, 1936, when the work
was completed. The cost of the work was $14,450.16.
   Maintenance dredging, by contract, was performed on five shoals
between the mouth and Hamilton during July 15 and September 18,
1936. There were removed 91,174 cubic yards of material from
6,270 feet of channel. The cost of the work was $40,758.49.
   The total cost was $55,208.65, all for maintenance. The total ex-
penditure was $57,990.79.
   Condition at end of fiscal year.-The existing project is about 87
percent completed. Navigation between Albemarle Sound and
Palmyra is practicable throughout the year. The controlling depth
between Albemarle Sound and Hamilton is 10 feet; and between
Hamilton and Weldon, 3 feet, mean low water.
458          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The work remaining to be done is the completion by dredging,
snagging, and regulation of a channel between Hamilton and
Weldon, a distance of 67 miles, to a depth of 5 feet over a least
bottom width of 50 feet.
   The total cost and expenditures have been $390,680.88, of which
$267,137.41 was for new work and $123,543.47 was for maintenance.
   Proposed operations.-An allotment of $7,500 made during July
1937 will be applied to maintenance dredging, snagging, and bank
trimming between the mouth and Palmyra with U. S. derrick barge
Roanoke, April to June 1938.
   The additional sum of $15,000 can be profitably expended during
the fiscal year ending June 30, 1939, and will be applied to main-
tenance dredging, snagging, and bank trimming between the mouth
and Palmyra, with U. S. derrick barge, July to September 1938.
                                   Cost and financial summary

Cost of new work to June 30, 1937-------------------  -------  $267, 137. 41
Cost of maintenance to June 30, 1937-------------------------- 123, 543. 47
      Total cost of permanent work to June 30, 1937-------------390, 680. 88
Net total expenditures---------   ----- -----------------------  390, 680. 88
Total amount appropriated to June 30, 1937-----------------      390, 680. 88

         Fiscal year ending June 30              1933          1934           1935           1936             1937

Cost of new work..    --..........       .----.........--.----                 ....-      .--------. .
Cost of maintenance-------------------$7, 357. 33          $3, 629. 90      $2, 760. 1    $8, 030. 18  $55, 208. 65

'Totalexpended_....-.-   --- _------- --        8, 920. 03    3, 312. 65     3, 094. 65    5,248. 04         57, 990. 79
Allotted-.....-__--------------------      -    7, 000. 00   14, 794. 54   -3, 165.00     58, 000. 00 .........


Balance unexpended July 1, 1936   ---------- -----------------          $57, 990. 79
Gross amount expended--------------------------            $58, 000. 18
Less reimbursements collected ------------------------            9. 39
                                                                         57, 990. 79

Amount allotted from War Department Civil Appropriation                                      Act
approved July 19, 1937---                                                                                  500. 00
                                                                                                         7----------------------------
Amount available for fiscal year 1938------------------------                                            7, 500. 00

Amount (estimated) required to be appropriated for completion of
existing project 1------__-------------------------48,                                                      300. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1-------               --------------------------                           15, 000. 00
  1 Exclusive of available funds.

                              18. SCUPPERNONG RIVER, N. C.

   Location.-This river rises in the center of a peninsula between
Albemarle and Pamlico Sounds. It flows in a general northerly direc-
tion,, making a long bend eastward to the town of Columbia, then
turning westward again until it flows into Albemarle Sound. (See
U. S. Coast and Geodetic Survey Chart No. 1228.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1879, and June 13, 1902. The cost and expenditures were $21,248.68
for new work and $13,061.56 for maintenance, a total of $34,310.24.
For further details see page 1802 of Annual Report for 1915.
                    RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                                              459
   Existing project.-This provides for a channel 10 feet deep and 150
feet wide on bottom across the bar; thence 10 feet deep and 100 feet
wide on bottom up to and in front of the town of Columbia; thence
8 feet deep and 40 feet wide on bottom to Spruills Bridge, near Cres-
well, including six cut-offs; thence 7 feet deep and 30 feet wide on
bottom to the highway bridge near Cherry; and a turning basin
7 feet deep, of a triangular form 150 feet wide on a side, near Cherry
Bridge, at the mouth of Mauls Creek.
   The plane of reference is mean low water. This is a nontidal
stream, the oscillations of the surface being controlled by the winds,
which cause ordinary variations of 1 foot. The extreme range of
wind tides is 5.1 feet, as determined by 1 year's tide-gage readings.
   The estimate of cost for new work, revised in 1925, was $59,000,
exclusive of amount expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $2,500.
   The project was authorized by the River and Harbor Act of March
2, 1919 (H. Doc. No. 1196, 62d Cong., 3d sess.). The latest published
map is in the project document.
   Terminal facilities.-There are 11 wharves, piers, etc., on Scupper-
nong River, of which 9 are located at Columbia. The total berthing
space at Columbia is about 300 feet. All wharves are privately
owned and operated. The present facilities appear to be adequate
for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1925. The controlling depths at the end of the fiscal year
were the project depths for the various sections of the river. The
head of navigation is at a highway bridge near Cherry, 20 miles
above the mouth.
   The total cost and expenditure was $101,219.20, of which $59,914.95
was for new work and $41,304.25 for maintenance.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $7,500 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to maintenance dredg-
ing, snagging, and bank trimming, with U. S. derrick barge, Decem-
ber 1938 to January 1939.
                                        Cost and financial summary
Cost of new work to June 30, 1937 ......-
                                      ____    -______--      ___   $81, 163. 63
Cost of maintenance to June 30, 1937----------------------------54,     365. 81
      Total cost of permanent work to June 30, 1937                                              135, 529. 44
Net total expenditures________-________--__--__                                                  135, 529. 44
Total amount appropriated to June 30, 1937-__________                                _____     _ 135, 529. 44

            Fiscal year ending June 30                     1933    1934       1935         1936           1937

Cost ofnew work--        ....... -- -----------
                                      .......... ..               - --.-.-
Cost of maintenance ..........----------
                     ---                              906. 20-.--
                                     ---------............
                                                    $4,                   - $16, 508. 51 __                 .
Total expended-------...-------------                 ---------   4,906. 20 ..........   16,508.51
Allotted ....------...------------...     -----.--.   __          4,914. 71   $11, 500    5,000. 00


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------ -------------------------------                                      $7, 500. 00
460                    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                        19. MANTEO (SHALLOWBAG)                                  BAY, N. C.

   Location.-Manteo Bay or Shallowbag Bay, formed by a natural
indentation of the shore line, is situated on the northeastern side of
Roanoke Island, N. C. (See U. S. Coast and Geodetic Survey Chart
No. 1229.)
   Existing project.-This provides for a channel 100 feet wide and
6 feet deep at mean low water from that depth in Roanoke Sound
to the town of Manteo, a distance of about 22/3 miles. The variations
of the water surface are due to winds, such variations seldom exceed-
ing 1 or 2 feet higher or lower than the mean stage. The extreme
range of wind tides is 5.1 feet, as determined by 1 year's tide-gage
readings at Manteo. The estimate of cost for new work, made in
1908, was $13,750. The latest (1908) approved estimate of cost for
annual maintenance is $2,000.
   This project was adopted by the River and Harbor Act of June 25,
1910 (H. Doc. No. 906, 60th Cong., 1st sess.). The latest published
map is in the last-mentioned document.
   Terminal facilities.-There are 17 wharves on the portion of this
harbor under improvement. They have a total frontage of 1,060
feet. The existing facilities are considered adequate for the present
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1911. The controlling depth in April 1937, was 5.6 feet.
The head of navigation is Manteo.
   The total cost and expenditure was $54,837.65, of which $10,503.18
was for new work and $44,334.47 was for maintenance.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  The sum of $10,000 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to maintenance
dredging, by contract, November to December 1938.
                                                          Cost and financial summary

Cost of new work to June 30, 1937______------___-----------                                                            $10, 503. 18
Cost of maintenance to June 30, 1937------------------------                                                            44, 334. 47

    Total cost of permanent work to June 30, 1937 -------------                                                         54, 837. 65
Net total expenditures------------------     -------------------                                                        54,837. 65
Total amount appropriated to June 30, 1937----------------                                                       --     54, 837.65

              Fiscal year ending June 30                                 1933         1934          1935        1936         1937

Cost of new work-....................-................................................
Cost of maintenance---------------------- ------------ $827. 72                                   $5, 159.93 ------------
                                                                                                                        ------------
Total expended ....................----------------------- ------------                674. 30     5, 313. 35
Allotted..------------....................---------------..........           ---. 5,987. 65 ....................................
                                                                      ---------...........


Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance ---------------------------  $10, 000. 00
           RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                       461
                         20. MACKAY CREEK, N. C.

   Location.-Mackay (Mackeys) Creek has its source in a swamp
about 10 miles southeast of Plymouth, N. C., from which it flows in
a generally northerly direction and empties into Albermarle Sound
at a point about 5 miles east of the mouth of Roanoke River.
   Existing project.-This provides for the construction of a channel
9 feet deep at low water over a bottom width of 100 feet across
the bar at the mouth of the creek, a distance of about 2,200 feet; and
for the removal of obstructions between the sound and Mackeys, a
distance of about five-eighths mile. The tides in the creek as in
Albermarle Sound, are due almost entirely to winds alone and cause
variations in water surface at the mouth amounting to 1 foot, or 1.5
feet above or below the low-water plane. The influence of such tides
is noticeable as far upstream as the third bridge, a distance of about
12.5 miles from the mouth.
   The estimate of cost for new work, revised in 1927, was $13,375.
There is no approved estimate of cost for annual maintenance.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for dredging
the channel across the bar at the mouth of the creek (Annual Report
for 1889, p. 1137); and the act of July 3, 1930, provided for the
removal of obstructions from the creek between the sound and the
town of Mackeys (H. Doc. No. 775, 69th Cong., 2d sess.). The
latest published map is in the last-mentioned document.
   Terminal facilities.-The principal wharf on the creek is located
at the town of Mackeys and is under control of the Edenton-
Mackeys Ferry Co. There are five or six privately owned fishing
and logging wharves located upstream from Mackeys. All wharves
are connected to the highways of the locality and are open to the
public on payment of a nominal sum for wharfage. The existing
wharves are considered adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932. The controlling depth in January 1934, was 9 feet
at low water. The head of navigation is at Roper, N. C., 6.5 miles
above the mouth.
   The total cost and expenditure was $18,147.63, of which $13,374.60
was for new work and $4,773.03 was for maintenance.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to maintenance dredg-
ing, snagging, and bank trimming between the mouth and Mackeys
with United States derrick barge, November 1938.
                          Cost and financial summary

Cost of new work to June 30, 1937 -------------------           -__ $13, 374. 60
Cost of maintenance to June 30, 1937- -----------------------         4, 773.03
      Total cost of permanent work to June 30, 1937 -------- __ 18,147. 63
Net total expenditures___    --------------------------         18, 147. 63
Total amount appropriated to June 30, 1937 _____--___----___18, 147.63
462            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30                 1933           1934            1935              1936                  1937

C ost of new work-------------------------........,- -                         - - ---- ----       .....        . .....      .....
Cost of maintenance ---------------------------- $1,174. 07                    -------------------
Total expended-------------------------$42.05                     1, 174.07            ....            ................
Allotted-.1-        .   ..    .    ..------.....      ---...    - 1,499.59       -325. 52

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance--------------------------------                                                       $5, 000.00

   21. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                      (GENERAL)

  The cost of the work during the fiscal year was $66,486.73, and the
expenditure was $69,588.96, not including $912.50 cost and expendi-
ture from contributed funds. The balance unexpended June 30,
1937, $36,000.90, including $35,000 allotted during July 1937, will be
applied as needed during the fiscal year 1938, to payment of expenses
to be incurred under this heading. The additional sum of $40,000
can be profitably expended during the fiscal year ending June 30,
1939.
                                    Cost and financial summary

Cost of maintenance to June 30, 1937------------__                                              -___1$368, 843. 80
      Total cost of permanent work to June 30, 1937------------                                               368, 843.80
Plus accounts receivable June 30, 1937 _______--_________-                                                      4, 208. 75

     Gross total costs to June 30, 1937--- ---------                                      _____-              373, 052. 55
Minus accounts payable June 30, 1937 -----------                                           -4,
                                                                                          ___-                     349. 65
     Net total expenditures_...__.---..._-----__-                                                           1368, 702. 90
Unexpended balance June 30, 1937------------                                                                   1, 000. 90
         Total amount appropriated June 30, 1937__-------                                     ----          '369, 703. 80

         Fiscal year ending June 30                  1933          1934            1935              1936                  1937


Cost of new work------------------
               .....--- ....-            ---                                  -----------------                             _--

Cost of maintenance-----------------.__$34,193.31               $38, 203.89    $45, 393.32      $47, 620.89           $66, 486. 73
Total expended.--..................-...            34, 291.96    40, 000. 45    45, 704. 87      46, 752. 12              69, 588. 96
Allotted_..-----   ----------------...-..-.        36, 271.02    79, 032.78     45, 000.00       40, 000.00               32, 000. 00


Balance unexpended July 1, 1936------------     _- -__ ------                                                  $38, 589. 86
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936---------   __-$22, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved May 28, 1930--------------     10, 000. 00
                                                                                                                 32, 000. 00
      Amount to be accounted for-----------__---___           -                                             -_____
                                                                                                               70, 589. 86
Gross amount expended_----------------_______ $70, 609. 09
Less reimbursements collected- -----------        -__ 1, 020. 13
                                                                                                                 69, 588. 96
      Balance unexpended June 30, 1937_----------------------         1, 000. 90
Outstanding liabilities June 30, 1937                                 4, 217. 86
                                                        _--___-__.....----___
         Balance available June 30, 937- ..-                  _--------- -3, 216. 96
   1Exclusive of $912.50 contributed funds expended on beach-erosion study.
                  RIVERS AND HARBORS-NORFOLK, VA., DISTRICT                                                                 463
Accounts reecivable June 30, 1937--------------------------                                                          $4, 208.75

     Unobligated balance available June 30, 1937---------------                                                          991. 79
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------                                                           35, 000. 00

          Balance available for fiscal year 1938------------------                                                   35, 991. 79

Amount that can be profitably expended                      year ending
June 30, 1939, for maintenance
                                - - - - - - -in-- - fiscal
                                                    - - -- - - - - -
                                                                                                                      40, 000. 00
   2Exclusive of available funds.

22. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
               [Commercial statistics for these projects are given in pt. 2 of report]


                                                                   For last Cost and expenditures to
                                                                   full re-       June 30, 1937                       Estimated
                      Name of project                              port see                                           amount re-
                                                                    annual                                             quired to
                                                                    report    New work           Maintenance           complete


1. Channel to Newport News, Va.l --...--....                         1935     $1, 477, 261.99     $124, 253. 27       Completed.
2. Nansemond River, Va.l -------------------                         1935         167, 477. 11      48, 625. 61          Do.
3. Blackwater River, Va.l__---------------------                     1935          16, 144. 33     24, 055. 67           Do.
4. Perquimans River, N. C.1.-------------------                      1910          13, 750. 00 ...----.......            Do.

  1 Channels adequate for commerce.

               23. PLANT ALLOTMENT                                FOR NORFOLK, VA., DISTRICT

                                                        Cost and financial summary
Undistributed costs June 30, 1937    ---------------------------                                                    $167, 793. 80
Plus accounts receivable June 30, 1937-----------------------                                                         24, 799. 52

      Gross total costs to June 30, 1937----------                                                                   1-------------
                                                                                                                     192,  593. 32
Minus accounts payable June 30, 1937 ------------------------                                                         14, 074. 14
     Net total expenditures----------------------------------                                                        178, 519.18
Unexpended balance June 30, 1937 ----------------       ------                                                        14, 393. 14

          Total amount appropriated to June 30, 1937--------------192, 912.32

    Fiscal year ending June 30                             1933      1934            1935                1936             1937


Total expended_-----........-.__.--------------... .$135,082.81                                     $4, 464.88           $39, 096.49

Allotted_...     ......-.--------------..............                             158, 282. 75    -19,     000. 00        53, 629. 57


Balance unexpended July 1, 1936----------------------------                                                           -$139. 94
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------------                                                               53,629. 57

       Arhount to be accounted for__----------------------------53,                                                       489. 63
Gross amount expended -----------------------           $273, 054.16
Less :
    Reimbursements collected---------- $231, 905.16
    Receipts from sales-----------            2,052. 51
                                                         233, 957. 67
                                                                                                                      39, 096. 49
           Balance unexpended June 30, 1937----------                                                           -      14, 393. 14
    'Unexpended balance increased by $125.
         20196-37-pt. 1--30
464          REPORT OF CHIEF OF ENGINEERS,                                              U. S. ARMY, 1937

Outstanding liabilities June 30, 1937--------------                                               $10, 564. 40
Amount covered by uncompleted contracts _                                      ----          --     9, 655. 47
                                                                                                                 $20, 219. 87

     Balance available June 30, 1937 ---------                                            ------------             5, 826. 73
Accounts receivable June 30, 1937-------------------------                                                        24, 799.52

        Unobligated balance available June 30, 1937_-------------                                                  18, 972. 79

Status of reports called for by river and harbor acts and committee resolutions

                                                           Date trans-Recommenda-
        Locality             Authorization act              mitted to      Document no.                               tion
                                                            Congress

Appomattox River, Va__ Rivers and Harbors              ---.--.--..----
                           Committee resolu-
                           tion, Mar. 24, 1937.
Blackwater Creek, Va.__ Rivers and Harbors
                           Committee resolu-
                           tion, Jan. 14, 1936.
Burwells Bay, Va......._ River and Harbor Act,
                           Aug. 26, 1937.
Cashie River, N. C ....  Rivers and Harbors              May 13,1937                   Rivers and Harbors        Favorable.
                           Committee resolu-                                            Committee, 31, 75th
                           tion, Oct. 19, 1936.                                         Cong., 1st sess.
Chesapeake Bay, west- River and Harbor Act,            ..Sept.           21, 1936
ern shores of, from       Aug. 26, 1937.
  Plum (Tree) Point,
Va., to Hampton
  Roads, protection of
navigable waters of,
from shoaling.                                                                            ------ - - -   ----
Chowan River, N. C.... Rivers and Harbors              ...............
                           Committee resolu-
                            tion, Jan. 14, 1936.
Edenton Bay, N. C., to     River and Harbor Act,
  U. S. Fish Hatchery        Aug. 26, 1937.
  via Pembroke Creek.
Elizabeth River, south-     -...
                           _do................. ...............
  ern branch of, Norfolk
  Harbor, Va.
Lafayette River, Va.....  Rivers and Harbors Sept. 21,1936 Rivers and Harbors                                       Do.
                            Committee resolu-                   Committee, 5, 75th
                            tion, Jan. 24, 1936.                Cong., 1st sess.
Lynnhaven Bay, Inlet, Rivers and Harbors               ..-.-.....-.----               ------------------.---.-

  and River, Va.            Committee resolu-
                            tion. Feb. 27, 1936.
Norfolk Harbor, Va..... Rivers and Harbors .........-.....-                           --------...--..-..-.----

                            Committee resolu-
                            tion, Feb. 26, 1937.
Norfolk, Va., to Beau- River and Harbor Act, --.. -. - -. - ---
  fort Inlet, N. C., in-    Aug. 26, 1937.
  land waterway, pro-
  tection of lands in the
  vicinity of lock at
  Great Bridge, Va.,
  against flooding by
  storm tides.
Tasquotank River, N. Rivers and Harbors
  C., waterway from         Committee resolu-
  Norfolk to the sounds     tion, Jan. 27, 1937.
  of North Carolina.
Roanoke River, mouth Rivers and Harbors
  to Weldon, N. C.          Committee resolu-
                            tion, Jan. 24, 1936.
Salters Creek, Newport River and Harbor Act, Jan. 14,1937                                                        Unfavorable.
  News, Va., and chan-     Aug. 30, 1935.
  nel to deep water in
  Hampton Roads.
        RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                              465
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          WILMINGTON, N. C., DISTRICT
   This district includes river and harbor improvement in central
:and eastern North Carolina from Pamlico River to Shallotte River,
N. C., near the State line, embracing the watersheds of all rivers in
North Carolina within the limits stated and that portion of the in-
tracoastal waterway between Norfolk, Va., and Beaufort Inlet, N. C.,
south of and including the crossing of the New Holland, Higgins-
port & Mount Vernon Railroad in Hyde County, N. C., as well as the
portion of the intracoastal waterway from Cape Fear River, N. C.,
to Winyah Bay, S. C., north of Little River, S. C.
   District engineer: Maj. Ralph Millis, Corps of Engineers.
   Division engineer: Col. Earl I. Brown, Corps of Engineers.
                                    IMPROVEMENTS

                                      Page                                          Page
1. Inland waterway from Nor-                18. Inland waterway, Beaufort
      folk, Va., to Beaufort In-                   to Cape Fear River, N. C.,
      let, N. C_       -------        447          including waterway          to
2. Waterway connecting Swan                       Jacksonville, N. C_ ....         488
       Quarter Bay with Deep                 19. Intracoastal waterway, Cape
       Bay, N. C___                   465          Fear River, N. C., to Win-
3. Belhaven Harbor, N. C .-          466          yah Bay, S. C----_--             491
4. Far Creek, N. C       ______      467    20. Morehead      City   Harbor,
5. Pamlico and Tar Rivers,                        N. C                      _      494
       N. C-------------              469    21. Cape Fear River, N. C., at
6. Rollinson Channel, N. C.__        471          and below Wilmington __          498
7. Bay River, N. C_                  472    22. Cape Fear River, N. C.,
8. Silver Lake Harbor, N.
9. Neuse River, N. C_
                             C__      474
                                      475
                                                   above Wilmington ......
                                             23. Northeast (Cape Fear) River,
                                                                                     501

10. Smiths     Creek     (Pamlico                  N. C_                             506
       County), N. C _.____           477    24. Smiths Creek (Wilmington),
11. Swift Creek, N. C
12. Contentnea Creek, N. C-  --
13. Trent River, N. C_________
                                      478
                                      479
                                      481
                                                   N. C_
                                             25. Black River, N. C---
                                             26. Examinations, surveys, and
                                                                                    508
                                                                                    509
14. Channel connecting Thor-                       contingencies (general) - -       511
       oughfare Bay with Cedar               27. Other projects for which no
       Bay, N. C____                  482          estimates are submitted _         511
15. Beaufort Harbor, N. C ....        483    28. Plant allotment                     512
16. Waterway connecting Pam-                 29. Tar River, N. C., flood con-
       lico Sound and Beaufort                     trol-- - - - --          .- .-    512
       Harbor, N. C_                  485
17. Channel from Back Sound
      to Lookout Bight, N. C__        487

1. INLAND WATERWAY FROM NORFOLK, VA., TO BEAUFORT INLET,
     N. C. (SECTION EXTENDING FROM AND INCLUDING THE CROSS-
     ING OF THE NEW HOLLAND, HIGGINSPORT & MOUNT VERNON
     R. R. TO BEAUFORT INLET)

  For report on this improvement see page 447.
  2. WATERWAY       CONNECTING SWAN QUARTER                    BAY WITH DEEP
                              BAY, N. C.
  Location.-This waterway is a cut 5,500 feet long through the
narrow neck of marshland just west of Swan Quarter Bay, on the
north side of Pamlico Sound, near the mouth of Pamlico River. (See
U. S. Coast and Geodetic Survey Chart No. 1231.a
 466      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Existing project.-This provides for securing by dredging a chan-
nel 5,500 feet long, 50 feet wide at the bottom, and 6 feet deep at mean
low water. Variations in the water surface due to winds seldom
exceed 1 or 2 feet above or below mean stage.
    The estimate of cost for new work, made in 1907, was $14,575. The
latest (1928) approved estimate for annual cost of maintenance is
 $600.
   This project was adopted by the River and Harbor Act of June 25,
1910 (H. Doc. No. 445, 60th Cong., 1st sess.). For latest published
map see page 1734 of the Annual Report for 1912.
   Terminal facilities.-There are no wharves along this waterway,
and none are needed.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1911 at a saving of $6,024 under the estimated cost. At the
close of the fiscal year project depth prevailed. The total costs and
expenditures under the existing project to June 30, 1937, have been
$8,550.98 for new work and $10,433.40 for maintenance, a total of
$18,984.38.
   Proposed operations.-No funds were on hand July 1, 1937. An
allotment made during July 1937 ($3,000) will be applied to the
maintenance of the waterway by removing 10,000 cubic yards of
material, under contract, during November 1937.
   No work is proposed during the fiscal year 1939, as it is believed
that no maintenance work will be required.
                          Cost and financial summary

Cost of new work to June 30, 1937--------- ----                   -
                                                               _____--$8, 550. 98
Cost of maintenance to June 30, 1937----------_   -----                   433. 40
                                                                 -______10,

      Total cost of permanent work to June 30, 1937------------    18, 984. 38
Net total expenditures------------------_______                    18, 984. 38
Total amount appropriated to June 30, 1937                         18, 984. 38
                                                                -__________------_
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937___-------  ------------------------------     3, 000. 00
Balance available for fiscal year 1938__-----------------------     3,000. 00

                       3. BELHAVEN HARBOR, N.             '.

   Location.-The town of Belhaven is located at the junction of
Pantego Creek and Pungo River, about 11 miles above the mouth
of the latter. The harbor consists of the lower reaches of Pantego
Creek and is about 6,000 feet long. Pungo River forms part of the
inland waterway from Norfolk to Beaufort, Norfolk being 130 miles
north of Belhaven and Beaufort 66 miles south. (See U. S. Coast
and Geodetic Survey Chart No. 1231.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 100 feet wide, extending from deep water in Pungo
River to a point about 800 feet east of the highway bridge, with a
turning basin 800 feet long and 300 feet wide at the upper end. It
is a nontidal stream with little slope. Variations in the water sur-
face, due to winds, seldom exceed 2 feet above or below mean stage.
         RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                       467

    The estimate of cost for new work, made in 1927, was $55,000. The
latest (1927) approved estimate for annual cost of maintenance is
$5,000.
    This project was authorized by the River and Harbor Act ap-
proved July 3, 1930 (H. Doc. No. 778, 69th Cong., 2d sess.). The
latest published map is contained in this document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are 12 wharves along the town water
front, all of timber construction. One is owned by the town and is
open to use by all without charge; four have rail connections. The
facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931, at a saving of $1,500 under the estimated cost. At
the close of the fiscal year the project depth of 12 feet at mean low
water was available to Belhaven. The total costs and expenditures
to June 30, 1937, have been $53,500, all for new work.
   Proposed operations.-No funds were on hand July 1, 1937. An
allotment made during July 1937 ($15,000) will be applied to the
maintenance of the channel by removing 60,000 cubic yards of mate-
rial under contract during October 1937.
   No work is proposed during the fiscal year 1939, as it is believed
that no maintenance dredging will be required.
                            Cost and financial summary
Cost of new work to June 30, 1937 _______--      __________------------   $53, 500
Cost of maintenance to June 30, 1937----___---        ____-------------   -------
       Total cost of permanent work to June 30, 1937 ____-------------     53, 500
Net total expenditures_________________________                           53, 500
'Total amount appropriated to June 30, 1937--------------------------      53, 500
Amount allotted from War Department Civil Appropriation Act ap-
   proved July 19, 1937--------------------------------------------        15, 000
Balance available for fiscal year 1938______________________________      15, 000
                              4. FAR CREEK, N. C.

   Location.-Far Creek is located in Hyde County, N. C., and flows
in an easterly direction into Pamlico Sound at a point about 95 miles
south of Norfolk, Va. (See U. S. Coast and Geodetic Survey Chart
No. 1232.)
   Existing project.-This provides for a channel 7 feet deep at mean
low water and 60 feet wide from Pamlico Sound to a point about
200 feet below the highway bridge at Engelhard, with a turning
basin at the head. There is some lunar tide in Pamlico Sound, but
the principal variations in the level of the water surface are due to
winds. Ordinary winds cause a variation of about 1 foot, while
severe storms will double or triple this variation.
   The estimate of cost for new work, made in 1929, was $30,000.
The latest (1929) approved estimate for annual cost of maintenance
is $2,000.
468             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The project was authorized by the River and Harbor Act approved
July 3, 1930 (H. Doc. No. 112, 71st Cong., 1st sess.). The latest
published map is contained in this document.
  Local cooperation.-Fully complied with.
   Terminal facilities.-There are five wharves at Engelhard with a
total frontage of about 510 feet, all privately owned. The existing
facilities are considered adequate for present commerce.
  Operations and results during fiscal year.-The work for the year,
consisted of maintenance dredging under contract begun June 7,
1937, and completed June 29, 1937. The contractor removed 68,321
cubic yards of material, restoring the channel to project dimensions.
The cost of this work was $12,834.83, all for maintenance. The
expenditures were $1,115.83.
  Condition at end of fiscal year.-The project was completed in
1931. At the close of the fiscal year the project depth of 7 feet at
mean low water was available. The total costs under the existing-
project to June 30, 1937, have been $34,500 for new work and $32,-
320.93 for maintenance, a total of $66,820.93. The expenditures have
been $55,101.93.
  Proposed operations.-The balance unexpended July 1, 1937, $12,-
384.17, will be applied to the maintenance of the channel as follows:
Accounts payable June 30, 1937- -------------   ___-----    -   $11, 719. 00
Maintenance dredging under contract during July 1937 ----------      665.17
          Total for all work ----                               -__ ----------------------                                  12, 384. 17
  The additional sum of $2,000 can be profitably expended during
the fiscal year 1939, and will be applied to the maintenance of the
channel, under contract, during September 1938.
                                             Cost and financial summary
Cost of new work to June 30, 1937 .....-                                                                                   $34, 500.00'
Cost of maintenance to June 30, 1937---------- ---------------                                                              32, 320. 93

     Total cost of permanent work to June 30, 1937-----------66, 820. 93
Minus accounts payable June 30, 1937 -----------------------  11, 719. 00

     Net total expenditures _ -------------------------       55, 101. 93
Unexpended balance June 30, 1937  --------------------------- 12, 384.17
          Total amount appropriated to June 30, 1937- ----                                                    ___           67, 486. 10;

          Fiscal year ending June 30                            1933         1934              1935              1936           1937


Cost ofnew work---------------                           ----           ----------------------------------------
Cost of maintenance-------------                 ---     ------------     $19,486.10     ----------------------               $12,834.83

                                                  15, 860. 30 $3, 625. 80 ------------
Total expended---------------------------............................-----...........  1, 115. 83

                ---------------------------...........
Allotted --------                                                          19, 486. 10    ..      ..--------------------       13, 500. 00


Amount allotted from War Department Appropriation Act approved
May 15, 1936- --    --- ___-$13,                                                                                              500. 00
Gross amount expended---.-----....______---___-         -                                                                    1,115. 83
          Balance unexpended June 30, 1937                                          --------------                          12, 384. 17"
         RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                            469
Outstanding liabilities June 30, 1937_                          $172. 75
Amount covered by uncompleted contracts__------               11, 546. 25
                                                                            $11, 719. 00

       Balance    available    June 30,   1937-----------------------           665.17

Amount that can be profitably expended in fiscal year ending June
                                  - - -   -     -     -   -
30, 1939, for maintenance 1_- - __               ___    ______               2, 000. 00
  1 Exclusive of available funds.

                      5. PAMLICO AND TAR RIVERS, N. C.

   Location.-The two names are applied to the same river, it being
known as the Pamlico below Washington, N. C., and as the Tar above
that point. This stream rises in Person County, flows in a general
southeasterly direction for 217 miles, and empties into Pamlico
Sound. The Pamlico River is 38 miles long. (See U. S. Coast and
Geodetic Survey Chart No. 537.)
   Previous projects.--Adopted by acts of July 4, 1836, and August
30, 1852. The cost and expenditures on these projects were $15,000.
   Existing project.--This provides for a channel 12 feet deep at
mean low water and 200 feet wide from the 12-foot contour in the
river below Washington to the Atlantic Coast Line Railroad bridge
at Washington; 12 feet deep and 100 feet wide from Washington to a
turning basin of the same depth, 200 feet wide and 300 feet long, in
Hardee Creek, 1,500 feet above its mouth; 6 feet deep and 75 feet
wide to Greenville; 20 inches deep and 60 feet wide to Tarboro;
thence to clear the natural channel above Tarboro to Little Falls.
The length of section under improvement is 93 miles, extending from
a point 10 miles below Washington to Little Falls. The stream is
nontidal; variations in the water surface at Washington, due to pre-
vailing winds, seldom exceed 2 feet. The extreme range of the flood
or freshet stage for the upper section is 34 feet at Tarboro. For
the lower section the extreme range due to winds it 8.3 feet.
   The estimate of cost for new work, revised in 1937, is $754,000,
exclusive of amount expended on previous project. The latest (1937)
approved estimate for annual cost of maintenance is $66,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 14, 1876, authorized a channel of 9
feet from the mouth to Washington; the act of May 3, 1879, provided
for the section of the river between Washington and Tarboro (H.
Doc. No. 68, 45th Cong., 3d sess.); the section of the river between
Tarboro and Little Falls (Rocky Mount) was added to the project
in 1890 (Annual Report for 1889, p. 1130); the River and Harbor
Act of March 2, 1907, authorized changing the depth between Wash-
ington and Greenville (H. Doc. No. 342, 59th Cong., 2d sess.); the
River and Harbor Act of July 25, 1912, covered the latest modifica-
tion of the portion between Washington and Greenville and author-
ized increase in depth from the mouth to Washington from 9 to 10
feet (H. Doc. No. 270, 62d Cong., 2d sess.) ; the act approved July 3,
1930 (River and Harbors Committee Doc. No. 11, 71st Cong., 1st
470      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

sess.), provided for the 12-foot channel, and the act approved August
26, 1937 (Rivers and Harbors Committee Doc. No. 22, 75th Cong.,
1st sess.), provided for the 12-foot channel from Washington to a
turning basin in Hardee Creek. The latest published maps are in the
five last-mentioned documents.
   Recommended modifications of project.-The abandonment of this
improvement above Tarboro, N. C., is recommended in House Docu-
ment No. 467, Sixty-ninth Congress, first session.
   Local cooperation.-The project authorized in the River and Har.
bor Act of August 26, 1937, provides that local interests furnish,
free of cost to the United States, necessary rights-of-way and suitable
spoil-disposal areas for new work and for subsequent maintenance
as required, and agree to construct an adequate public wharf on
Hardee Creek with a suitable hard-surfaced highway connection.
These requirements have not been complied with.
   Terminal facilities.-There are 54 wharves on the portion of this
river under improvement, of which 34 are along the water front at
Washington, 19 between Washington and the mouth, and only 1 in
usable condition above Washington. They have a total frontage of
3,570 feet. The existing facilities are considered adequate for the
existing commerce. For further details see page 535, Annual Report
for 1932.
   Operations and results during fiscal year.-The work for the year
consisted of maintenance snagging and surveys. The U. S. derrick
boat Northeast operated between Washington and a point 21 miles
above, clearing the channel between these points. The cost of this
work was $1,852.28 for snagging and $1,003.30 for surveys. The ex-
penditures, all for maintenance, were $2,855.58.
   Condition at end of fiscal year.-The existing project, with the
exception of the 12-foot channel from Washington to a turning basin
in Hardee Creek, was completed in 1931. At the close of the fiscal
year the limiting mean low-water depth below Washington was 10.5
feet. Above Washington the limiting low-water depth is 6 feet to a
point 11 miles above Washington, 4 feet to a point 3 miles below
Greenville, 2.8 feet to Greenville, thence 1 foot to the mouth of
Fishing Creek. The total costs and expenditures under the existing
project to June 30, 1937, have been $426,100.39 for new work and
$261,127.33 for maintenance, a total of $687,227.72.
   Proposed operations.-The balance unexpended July 1, 1937, to-
gether with an allotment of $17,000 made during July, 1937
 ($17,827.21), will be applied as follows:
Maintenance:
   Dredging 70,000 cubic yards of material from the channel at
      and below Washington under contract, during November
       1937---------------      ----------------------------      $14, 827. 21
    Operating the Government derrick boat Contentnea between
      Washington and Greenville, 22 miles above, 2 months, Oct. 1
      to Nov. 30, 1937--------------------------------------        3, 000. 00

        Total for all work-1--------------------------------7,         827.21
  The additional sum of $345,000 can be profitably expended during
the fiscal year 1939, and will be applied as follows:
New work: Dredging 2,190,000 cubic yards of material from 12-foot
  channel between Washington and turning basin in Hardee Creek,
under contract, between July 1, 1938, and June 30, 1939--------- $328, 000
             RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                            471
Maintenance:
    Dredging the channel at and below Washington under contract,
      during July 1938    --------------------------------------    $14, 000
    Operating the Government derrick boat Contentnea between
      Washington and Greenville, 22 miles above, 2 months, Mar. 1
      to Apr. 30, 1939--------     --------------------------------   3, 000
              Total for all work ------.                   '-------------------                                    345, 000
                                          Cost and financial summary
Cost of new work to June 30, 1937-   ----------------------- $441, 100. 39
Cost of maintenance to June 30, 1937   ----------------------- 261,127. 33
          Total cost of permanent work to June 30, 1937-----------702, 227. 72

Net total expenditures----------------------------------      702,227.72
Unexpended balance June 30, 1937-----------------------------     827. 21

          Total amount appropriated to June 30. 1937--..----------                                           703. 054. 93

          Fiscal year ending June 30                      1933           1934          1935          1936            1937


Cost of new work-......................................--------....
Cost of maintenance---- ----------------- $2, 734. 97                 $17, 698.42    $3, 489.67    $5, 740. 77      $2, 855. 58
Total expended----......--------------------2, 734. 97                 17, 437. 25    2, 342. 36    7, 149. 25       2, 855. 58
Allotted------          ------------------- ----         3, 315. 94    30, 909. 91   31, 449. 97   17, 000. 00    -49, 708. 36


Balance unexpended July 1, 1936--------------------------                                                    $53,391. 15
Deductions on account of revocation of allotment---------------                                               49, 708. 36

      Net amount to be accounted for-------------------------3,                                                      682. 79
Gross amount expended    ------------------------------------                                                     2, 855. 58
     Balance unexpended June 30, 1937------------------------                                                       827. 21
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 ---------------------------------                                                        17, 000. 00
      Balance available for fiscal year 1938-------------------17,    827. 21
Amount (estimated) required to be appropriated for completion of
existing project 1    ------------------------------------      328, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
   For new work 1- - - - - -        - - - - - - - - - - - - - - - - - - - - -- - - -- -
                                                                                        328, 000. 00
   For maintenance 1_- - __
                          -- - -
                                 __         __________________- - - - - -                17, 000. 00
       Total         ----------------------------------------------                                         345, 000. 00
  1Exclusive of available funds.
                                   6. ROLLINSON CHANNEL, N. C.

   Location.-This channel extends from deep water in Pamlico
Sound to a natural inner basin lying north of the village of Hatteras,
near Hatteras Inlet, N. C, (See U. S. Coast and Geodetic Survey
Chart No. 1232.)
  Existing project.-This provides for dredging a channel about
4,300 feet long, 100 feet wide at the bottom, and 6 feet deep at mean
low water. Variation in the water surface due to winds seldom ex-
ceeds 1 or 2 feet above or below mean stage. Severe windstorms
will double or triple this variation. The estimate of cost for new
472            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

work, made in 1932, is $27,000. The latest (1932) approved estimate
for annual cost of maintenance is $5,400.
  The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 218, 72d Cong., 1st sess.). The latest
published map is contained in this document.
   Terminal facilities.-None required.
  Operations and results during fiscal year.-The work for the year
consisted of dredging by contract. The contractor, from October
23 to December 11, 1936, removed 78,348 cubic yards of material from
the channel, completing the project. The cost and expenditures were
$20,125.43, all for new work.
   Condition at end of fiscal year.-The project was completed in
1936, at a saving of $6,875 under the estimated cost. At the close of
the year the controlling depth at mean low water was 6 feet. The
total costs and expenditures under the existing project to June 30,
1937, have been $20,125.43, all for new work.
  Proposed operations.-No funds are on hand and no work is pro-
posed during the fiscal years 1938 and 1939, as it is believed that no
maintenance dredging will be required.
                                            Cost and financial summary

Cost of new work to June 30, 1937_-----                                                 __________-__ $20,125.43
Cost of maintenance to June 30, 1937                                        _-                        --- _  -
      Total cost of permanent work to June 30, 1937 ______--- -                                               20, 125. 43
Net total expenditures-------------------------------------                                                   20, 125. 43
Total amount appropriated to June 30, 1937 ____------, __--                                                   20, 125.43

           Fiscal year ending June 30                            1933            1934     1935     1936           1937


Cost ofnew work...--------                     -------------------...........------------------------           $20, 125. 43
Cost of maintenance....................... ....................-- ......---------------------------------
Total expended----. --.--.. -               .----------------------------                             -          20, 125.43
Allotted           ---------------------------------------------------                             $27, 000     -6, 874. 57


Balance unexpended July 1, 1936---------------------------- $27, 000.00
Deductions on account of revocation of allotment-__           6,874. 57

      Net amount to be accounted for -- ___--------- ---- __-                                                 20, 125. 43
Gross amount expended      ------------------------------------                                               20,125.43

                                                  7. BAY RIVER, N. C.

  Location.-Bay River is a small stream lying wholly in Pamlico
County. It is about 20 miles long and enters Pamlico Sound be-
tween the Neuse and Pamlico Rivers. Bayboro, 17 miles above the
mouth, is the practical head of navigation. (See U. S. Coast and
Geodetic Survey Chart No. 1231.)
  Existing project.--This provides for a channel 10 feet deep at
mean low water and 150 feet wide to a point 3,500 feet below Stone-
wall, and thence 100 feet wide and 10 feet deep to Bayboro; for a
channel of the same depth and 50 feet wide in the Northwest Prong
from its mouth to the Mill Dam in Bayboro, ending in a turning
basin 100 feet wide and 150 feet long; and for a channel of the
same depth and 100 feet wide from deep water in Bay River to and
         RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT             473

,depth
along the wharves at Vandemere, ending in an anchorage of the same
          and 150 feet wide on the north side of the town. The lengths
of the sections under improvement are about 6 miles in Bay River,
1,000 feet in the Northwest Prong, and 3,000 feet in the channel to
Vandemere. The stream is nontidal, with very little slope. Varia-
tions in the water surface due to winds seldom exceed 1 or 2 feet.
The extreme variation is about 8 feet.
    The estimate of cost for new work, revised in 1937, is $47,000.
'The latest (1937) approved estimate for annual cost of maintenance
.is $2,000.
    The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for the channel in Bay
River to Bayboro (H. Doc. No. 583, 61st Cong., 2d sess.); the act of
August 26, 1937, provided for the channel in Northwest Prong
  (Rivers and Harbors Committee Doc. No. 72, 74th Cong., 2d sess.),
and for the channel to Vandemere (H. Doc. No. 185, 75th Cong.,
  1st sess.). The latest published maps are in the two documents last
cited.
    Local cooperation.-Work on the channel in the Northwest Prong
is subject to the provision that local interests furnish, free of cost
to the United States, spoil-disposal areas as required for new work
or for future maintenance and all other lands needed for the im-
provement, and release the United States from all claims for dam-

*on
ages to wharves or other structures resulting from the work. Work
      the channel to Vandemere is subject to the provision that local
interests furnish, free of cost to the United States, necessary rights-
of-way and suitable spoil-disposal areas for new work and for sub-
sequent maintenance as required; and to the further provision that
.,a suitable public agency acquire and reserve for public use a strip
of land not less than 50 feet wide and 200 feet long on the south side
of the proposed anchorage, with a public highway connection there-
to, or make other provision, satisfactory to the Secretary of War,
for the provision of a public terminal open to all on equal and rea-
sonable terms. These conditions have not been complied with, but
it is believed that they will be.
    Terminal facilities.-There are 5 wharves at Bayboro and 8
  at Vandemere, all of light timber construction, with a total avail-
able frontage of 520 feet. One wharf at Bayboro is a city wharf,
with a frontage of 50 feet; the remaining wharves are privately
owned but are generally open to use by all water carriers when not
:required by their owners. None has railway connections. The
  facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The 10-foot channel in Bay River
to Bayboro was completed in 1914. No work has been done on the
tchannel to Vandemere or on that in the Northwest Prong to Bay-
boro. The limiting depth to Bayboro is about 8 feet at mean low
water, 4 feet in the Northwest Prong in Bayboro, and 8 feet to the
wharves at Vandemere. The total cost and expenditures under the
existing project to June 30, 1937, have been $22,729.76 for new work
and $4,170.24 for maintenance, a total of $26,900.
    Proposed operations.-No funds are on hand and no work is pro-
posed during the fiscal year ending June 30, 1938.
474      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The sum of $26,000 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to new work by the
removal of 115,500 cubic yards of material, under contract, during
September and October 1938, thus completing the project as modi-
fied in the 1937 River and Harbor Act.
                         Cost and financial summary
Cost of new work to June 30, 1937--------------------------- $22, 729. 76
Cost of maintenance to June 30, 1937-------------------------- 4, 170. 24
      Total cost of permanent work to June 30, 1937-------------      26, 900. 00
Net total expenditures_  -------------------------------------
                                         _                            26,900.00
Total amount appropriated to June 30, 1937----------------------      26, 900. 00
Amount (estimated)    required to be appropriated for completion of
existing project    -----------------------------------------        26, 000. 00=
Amount that can be   profitably expended in fiscal year ending June
30, 1939, for new   work ..-----------------------------------       26, 000. 00

                     8. SILVER LAKE HARBOR, N. C.

   Location.-Silver Lake Harbor is located at the westerly end of
Ocracoke Island, which is a portion of the barrier separating Pamlico
Sound from the Atlantic Ocean. Beaufort Harbor lies about 50
miles southwest; Belhaven is about 60 miles northwest. (See U. S.
Coast and Geodetic Survey Chart No. 1232.)
   Existing project.-This provides for a channel 5 feet deep at mean
low water and 50 feet wide, extending from that depth in the sound
to the 3-foot contour in Silver Lake Harbor, together with a training
wall 300 feet long to protect the outer end of the entrance channel
from northeast storms. The ordinary range of tide within the lake
is about 1 foot, with about 21/2 feet at the outer end of the connecting
channel. Severe storm tides have been known to raise the water
surface of the lake as much as 5 feet.
   The estimate of cost for new work, made in 1927, was $11,000.
The latest (1927) approved estimate for annual cost of maintenance
is $900.
   The existing project was authorized by the River and Harbor Act
approved July 3, 1930 (Rivers and Harbors Committee Doc. No. 3,
70th Cong., 1st sess.). The latest published map is contained in this
document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three small wharves extending
from the shore to the deeper waters in the lake, and one at the outer-
entrance of the channel. While poorly constructed and few in num-
ber, they are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1931. At the close of the fiscal year the limiting low-water depth in
the entrance channel was 4.3 feet, and the training wall was in good
condition. The total costs and expenditures under the existing proj-
ect to June 30, 1937, have been $11,000 for new work and $700 for-
maintenance, a total of $11,700.
           RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                          475
   Proposed operations.-The balance unexpended July 1, 1937,
$2,000, will be applied to maintenance dredging in the entrance
channel by the removal of 8,000 cubic yards of material under con-
tract, between July 1 and September 30, 1937.
   No work is proposed during the fiscal year 1939, as it is believed
that no maintenance dredging will be required.
                                     Cost and financial summary
Cost of new work to June 30, 1937--------------------------                                  $11, 000.00
Cost of maintenance to June 30, 1937__-----------------700.                                           00
         Total cost of permanent work to June 30, 1937_ ........                   ___        11, 700. 00

Net total expenditures ______________ -_______--       -    -                                 11, 700. 00
Unexpended balance June 30, 1937----------------------------                                   2, 000. 00
         Total amount appropriated to June 30, 1937-                       ----               13, 700. 00

         Fiscal year ending June 30             1933           1934       1935     1936           1937


Cost of new work...-------------------------------
Cost of maintenance- .....----..--------------    $700
Total expended...----------------------------          700 -
Allotted------------   ----- ----------------          700 ------------   $1,800   -$1,800          $2, 000


Amount allotted from War Department Appropriation Act approved
  April 26, 1934___________       ______________            ---------------                    2, 000. 00
Balance unexpended June 30, 1937_____________________                                          2, 000. 00
Outstanding liabilities June 30, 1937---------------------_         $156. 84
Amount covered by uncompleted contracts -----------                1,352.00
                                                                                               1, 508. 84
         Balance available June 30, 1937----                     ---                             491. 16
                                       9. NEUSE RIVER, N. C.

   Location.-Rises in the northerly part of North Carolina and flows
in a southeasterly direction until it reaches Kinston; thence northeast
to mouth of Contentnea Creek; thence southeast to a point 20 miles
below New Bern; thence northeast until it flows into Pamlico Sound.
Its total length is about 300 miles. (See U. S. Coast and Geodetic
Survey Chart No. 538.)
   Existing project.-This provides for a channel 300 feet wide and 12
feet deep at mean low water up to and in front of New Bern; 4 feet
deep at dead low water to Kinston, and during 9 months of the year
3 feet deep at dead low water to Smithfield, to be obtained by dredg-
ing and snagging. Length of the section included in the project,
about 184 miles. The stream is nontidal; variations in the water
surface at and below New Bern, due to prevailing winds, seldom
exceed 2 feet above or below mean stage. The extreme range of
flood or freshet stage for the upper section of the river is 21 feet at
Selma. Tide-gage readings at New Bern, covering 4 years, show the
extreme range of wind tides to be 8.3 feet.
   The estimate of cost for new work, revised in 1927, was $417,200.
The latest (1928) approved estimate for annual cost of maintenance is
$12.500.
476      REPORT OF CHIEF OF'ENGINEERS, U. S. ARMY, 1937

   The project was authorized by the following river and harbor acts:
The act of June 18, 1878, as extended in 1879, provided for the por-
tion of the river above New Bern (Annual Report for 1872, pp.
734-741, and Annual Report for 1879, pp. 708-710) ; act of June 13,.
1902, provided for a depth of 8 feet at dead low water at and below
New Bern (H. Doc. No. 317, 54th Cong., 2d sess.), and the act of Janu-
ary 21, 1927, provided for a depth of 12 feet (H. Doc. No. 299, 67th
Cong., 2d sess.). The latest published map is in the Annual Report
for 1889, page 1058.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 30 wharves on this stream, of which
2 are below New Bern, 16 at or near New Bern, 3 at Bridgeton, and 9
above New Bern. They have a total frontage of about 2,900 feet.
Existing facilities are considered adequate for present needs.
   Operations and results during fiscal year.-The work for the year
consisted of gage readings, made by the United States Geological
Survey in cooperation with this office. The cost and expenditures
for this work were $815.81, all for maintenance.
   Condition at end of fiscal year.-Except for the width of the chan-
nel in front of New Bern which is only 200 feet, the project is
completed to the practicable limit. Due to the fact that it is im-
practicable to obtain and maintain the project depth above New Bern
by dredging and snagging, the percentage of completion is uncertain.
At the close of the year a channel 300 feet wide and 11.5 feet deep
at mean low water existed from the mouth to New Bern. From New
Bern to a point 23 miles above, the controlling depth was 4 feet;
thence 21/2 feet to the mouth of Contentnea Creek, 32 miles above
New Bern; thence 1 foot to Seven Springs, 75 miles above New Bern.
The channel above New Bern is about 50 feet wide. The total costs
and expenditures under the existing project to June 30, 1937, have
been $403,066.04 for new work and $186,038.68 for maintenance, a
total of $589,104.72.
   Proposed operations.-The balance unexpended July 1, 1937, to-
gether with an allotment of $12,500 made during July 1937 ($12,-
550), will be applied to maintaining the channel at and below New
Bern by removing 60,000 cubic yards of material under contract,
during September 1937.
   The additional sum of $12,500 can be profitably expended during
the fiscal year 1939, and will be applied to maintaining the channel
at and below New Bern, under contract, during May 1939.
                         Cost and financial summary
Cost of new work to June 30, 1937 ____-____---_______---$403, 066.04
Cost of maintenance to June 30, 1937_________ ___-_______-186, 038. 68

      Total cost of permanent work to June 30, 1937_         _____-__   589, 104. 72
Net total expenditures _________________--
                                 -                                      589, 104. 72
Unexpended balance June 30, 1937_ ____       ______1______1_                  50. 00
      Total amount appropriated to June 30, 1937__--   ---              589, 154. 72
              RIVERS AND ,HARBORS-WILMINGTON, N. C., DISTRICT                                                    477

    Fiscal year ending June 30            1933                1934             1935           1936            1937


Cost of new work............------   ---------------------
Cost of maintenance-------------         $2, 450. 53         $2, 794.99 ...--------------      $213. 56         $815.81

Total expended-----------------           2, 450.53           2, 794.99    --------------       213. 56          815. 81
Allotted.-----------------------          3,272.57           15, 446. 75     -$1, 949.97    -1,500.00        -9,920. 63


Balance unexpended July 1, 1936-----        --------------------                                          $10, 786.44
Deductions on account of revocation of allotment----------------                                            9, 920. 63

      Net amount to be accounted for ---------------------                                                    865. 81
Gross amount expended--------------------- ----------------                                                   815. 81

     Balance unexpended June 30, 1937--------------------------                                                 50. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 ----------------------------------                                                 12, 500. 00

           Balance available for fiscal year 1938                                                          12, 550. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                   12, 500.00
   SExclusive of available funds.

                       10. SMITHS CREEK (PAMLICO COUNTY), N. C.

   Location.-Smiths (Smith) Creek rises in Pamlico County, flows
in a general southerly direction, and empties into Neuse River at the
town of Oriental, 25 miles southeasterly from New Bern, N. C. It
is about 5 miles long but navigable only 2 or 3 miles above its mouth.
 (See U. S. Coast and Geodetic Survey Chart No. 538.)
   Existing project.-This provides for the excavation of a basin in
the small bay located in the center of the town of Oriental, and just
inside the mouth of the creek, to a depth of 10 feet at mean low
water, and removing several lumps and projecting points in the
entrance channel. Variations in the water level, due to winds, seldom
exceed 2 feet above or below mean stage. Observations of 4 years'
duration show that the extreme range of wind tides is 8.3 feet.
   The estimate of cost for new work, made in 1910, is $16,250. The
latest (1910) approved estimate for annual cost of maintenance is
$1,000.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 774, 61st Cong., 2d sess.). The latest
published map is in the project document.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are 16 wharves in this harbor, all of
timber construction with pile foundations. They have a frontage
varying from 6 to 40 feet, the total frontage being about 400 feet.
None has rail connections. One wharf was built by the town and
is to be maintained in perpetuity as a public wharf. The remaining
wharves are all privately owned but are generally open to use by the
public when not required by the owners. The existing facilities are
considered adequate.
478            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year.-The work for the year
consisted of maintenance dredging with Government plant and hired
labor. The U. S. pipeline dredge Henry Bacon, working from July
13 to 22, 1936, removed 73,920 cubic yards of material from the
entrance channel and inner basin, restoring them to project dimen-
sions. The cost of this work was $6,699.71. The expenditures were
$6,703.56, all for maintenance.
   Condition at end of fiscal year.-The project was completed in
1936 at a saving of $1,778 under the estimated cost. At the close
of the year the project depth of 10 feet at mean low water was avail-
able. The total costs and expenditures under the existing project
to June 30, 1937, have been $14,471.80 for new work and $6,957.80
for maintenance, a total of $21,429.60.
   Proposed operations.-No funds are on hand and no work is pro-
posed during the fiscal years 1938 and 1939, as it is believed that
no maintenance dredging will be required.
                                           Cost and financial summary

Cost of new work to June 30, 1937_--_------------
                                    _-------                                                                           $14, 471.80
Cost of maintenance to June 30, 1937 ------------------------                                                            6, 957.80

      Total cost of permanent work to June 30, 1937_-____----- 21, 429. 60
Net total expenditures _ __--------------------- ---           21, 429. 60
Total amount appropriated to June 30, 1937-------------------21, 429. 60

          Fiscal year ending June 30                        1933            1934            1935                1936         1937


Cost of new work-------                   ------------      -------------------------------------------
Cost of maintenance------........---------------- -----------------------. ------------                           $3.85     $6,699. 71
Total expended............--------------------------------------- ----------------                        ------------       6, 703.56
Allotted------------------------------------------ ----------- ------------                                 15, 000.00     -8, 296.44


Balance unexpended July 1, 1936------------------                                                                     $15, 000. 00
Deductions on account of revocation of allotment-                                                          --            8, 296. 44
                                                                                                                  _----_---

      Net amount to be accounted for--------  ________-6,                                                                    703. 56
Gross amount expended_______------   __---------__                                              --                        6, 703. 56
                                          11. SWIFT CREEK, N. C.

   Location.-Swift Creek has its source in the swamps of Pitt
County, about 5 miles south of Greenville, N. C. It flows south-
easterly 43 miles and empties into Neuse River 71/2 miles above New
Bern, N. C. (See U. S. Geological Survey sheets New Bern, Vance-
boro, Ayden, and Winterville.)
   Existing project.-This provides for clearing the channel from the
mouth to Vanceboro, 12 miles, of snags and overhanging and leaning
trees. The rise of water level, due to prevailing winds and floods,
reaches its maximum height of about 12 feet at Vanceboro.
   The estimate of cost of new work, made in 1909, was $1,600. The
latest (1928) approved estimate for annual cost of maintenance is
$350.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 360, 61st Cong., 2d sess.). No map of
this creek has ever been published.
             RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                                       479
   Terminal facilities.-There are two wharves on this stream having
a total frontage of about 100 feet. The existing facilities are con-
sidered adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in 1910.
A channel 5 feet deep at mean low water, with a minimum width of
50 feet, was available at the end of the year to Vanceboro. The total
costs and expenditures under the existing project to June 30, 1937,
have been $1,600 for new work and $5,422 for maintenance, a total
of $7,022.
   Proposed operations.-No funds were on hand July 1, 1937. An
allotment made during July 1937 ($350), will be applied to main-
tenance snagging between the mouth and Vanceboro, 12 miles above,
with the Government derrick boat Contentnea during January 1938.
   The additional sum of $350 can be profitably expended during the
fiscal year 1939, and will be applied to maintenance snagging between
the mouth and Vanceboro, with the Government derrick boat
Contentnea during October 1938.
                                              Cost and financial summary
Cost of new work to June 30, 1937                                                                                                 , 600
                                                                                                                                 1,------------------------
Cost of maintenance to June 30, 1937----_----------                                                ---------                     5, 422
      Total cost of permanent work to June 30, 1937---------------                                                               7, 022
Net total expenditures_  ___, --------------------------------                                                                         022
Total amount appropriated to June 30, 1937--------------------------                                                             7, 022

                Fiscal year ending June 30                              1933          1934            1935           1936        1937

Cost of new work .-                             ----...-                -------...    ---                    -
Cost of maintenance .                  .---                                      --    ------      ----       I- -
                                                                                                             ---             -
Total expended--

Allotted-        --      ---      --      -    - -             --   -                       $350                     -$350         -



Amount allotted from War Department                                        Civil Appropriation Act, ap-
   proved       July 19,       1937------------_______---------------                                                             $350
Balance available for fiscal year 1938 ___------------------------------- 350
Amount that can be profitably expended in fiscal year ending June 30,
                             -
  "1939, for maintenance 1                      -          ------            ---                                                       350
   1 Exclusive of available funds.

                                   12. CONTENTNEA                       CREEK, N. C.

   Location.-Rises in Wilson County, N. C., flows in a general south-
easterly direction, and empties into Neuse River about 32 miles above
New Bern, N. C. (See U. S. Gealogical Survey sheets Ayden, Falk-
land, Kinston, and Wilson.)
   Existing project.-This provides for clearing the stream of ob-
structions so as to obtain from its mouth to Stantonsburg a depth
of not less than 3 feet during the higher stages about 9 months of
the year. The section under improvement is from the mouth to
Stantonsburg, 63 miles. The stream is subject to freshets. rising 11
feet above low water at Snow Hill and Stantonsburg, 32 and 63 miles
a)ove the mouth, respectively. Boating stages are generally avail-
            20196--27-pt. 1--31
480           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

able from January to June and intermittently during the remainder
of the year.
   The estimate of cost for new work, made in 1887, was $77,500.
The latest (1928) approved estimate for annual cost of maintenance
is $1,000.
   This project was adopted by the River and Harbor Act of March
3, 1881 (H. Dec. No. 85, 46th Cong., 3d sess., and Annual Report for
1881, p. 1010). The latest published map is on page 1014 of the
Annual Report for 1887.
   Recommended modifications of project.-The abandonment of this
improvement above Snow Hill, N. C., is recommended in House
Document No. 467, Sixty-Ninth Congress, first session.
   Terminal facilities.-There is one wharf on this stream. The
existing facilities are considered adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1896 at a saving of $13,105 under the estimated cost. At
present the stream is in poor condition. The controlling depth as-
certained in 1937 is 1 foot. The total costs and expenditures under
the existing project to June 30, 1937, have been $64,394.56 for new
work and $31,847.15 for maintenance, a total of $96,241.71.
   Proposed operations.-No funds were on hand July 1, 1937. An
allotment made during July 1937 ($1,000) will be applied to main-
tenance snagging between the mouth and Snow Hill, 32 miles above,
with the Government derrick boat Contentnea during January 1938.
   The additional sum of $1,000 can be profitably expended during
the fiscal year 1939 and will be applied to maintenance snagging
between the mouth and Snow Hill, with the Government derrick
boat Contentnea, during October 1938.
                                         Cost and financial summary

Cost of new work to June 30, 1937----------------__-           ___ $64, 394. 56
Cost of maintenance to June 30, 1937 -------------------------      31, 847.15

      Total cost of permanent work to June 30, 1937____--                                                       96, 241.71
Net total expenditures _    -------      -----------------                                                      96,241.71
Total amount appropriated to June 30, 1937 ----------------                                                     96, 241.71

            Fiscal year ending June 30                   1933          1934               1935           1936        1937


Cost of new work ----------..      .--
Cost of maintenance---------------                   --           - --------------.----                         --
Total expended-----....-------------                 -                --------------------------------
Allotted...-------......----....------------------       $1,000        $1, 000      -$2, 416. 29


Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937----__ -----------------------------------                                              $1,000.00
Balance available for fiscal year 1938----------------------------                                               1, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance __    ___________________________                                                     1, 000.00
   1 Exclusive of available funds.
       RIVERS AND HARBORS-WILMINGTON,           N. C., DISTRICT    481

                       13. TRENT RIVER, N. C.

    Location.-This stream is formed by the junction of Beaver Dam
and Tuckahoe Creeks, in Jones County, N. C. It flows for 80 miles
 (about 40 miles in an air line) in an easterly direction through Jones
and Craven Counties, and at New Bern empties into the Neuse River,
being its principal tributary. (See U. S. Geological Survey sheets,
New Bern and Trent River.)
    Previous projects.-Adopted by the River and Harbor Act ap-
proved March 3, 1879, and modified in 1885, 1887, 1889, and 1896.
The cost and expenditures were $70,905.40 for new work and $27,-
104.99 for maintenance, a total of $98,010.39. For further details
see page 1803 of the Annual Report for 1915.
    Existing project.--This provides for a channel 12 feet deep at
mean low water and 300 feet wide in front of New Bern, a channel
of 6 feet depth at dead low water over Foys Flats, and a channel 50
feet wide and 4 feet deep at low water to Trenton. The length of
section included in the project is 38 miles. Near the mouth the
water level varies about 2 feet under normal conditions, according
to prevailing winds.
    The estimate of cost for new work, revised in 1927, was $41,600,
exclusive of amounts expended on previous projects. The latest
  (1927) approved estimate for annual cost of maintenance is $2,100.
The existing project was authorized by the following river and har-
bor acts: The act of June 13, 1902, provided for a depth of 8 feet
at dead low water at New Bern (H. Doc. No. 121, 56th Cong., 2d
sess.). Joint Resolution No. 22, approved March 4, 1907, covered the
section at Foys Flats; act of June 25, 1910, provided for the work
in the upper section of the river (H. Doc. No. 1471, 60th Cong., 2d
sess.); and the act of January 21, 1927, provided for increasing the
depth at New Bern to 12 feet at mean low water (H. Doc. No. 299,
67th Cong., 2d sess.). For latest printed map see page 1318 of the
Annual Report for 1895.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are 27 wharves on the portion of this
stream under improvement, of which 21 are at or opposite New Bern,
5 are at or near Polloksville, and 1 at Trenton. They have a total
frontage of about 3,000 feet. The existing facilities are considered
adequate.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in
1929. At the close of the fiscal year, project dimensions existed to
Polloksville, 18 miles above the mouth. From Polloksville to Tren-
ton the controlling depth is 31/2 feet. The total costs and expend-
itures under the existing project to June 30, 1937, have been $44,-
294.05 for new work and $32,681.78 for maintenance, a total of
$76,975.83.
    Proposed operations.-An allotment made during July 1937
 ($1,500) will be applied to maintenance snagging between the mouth
and Trenton, 38 miles above, with the Government derrick boat
Contentnea, during February 1938.
482          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The additional sum of $2,100 can be profitably expended during
the fiscal year 1939 and will be applied to maintenance snagging be-
tween the mouth and Trenton, with the Government derrick boat
Contentnea, during November and December 1938.
                                    Cost and financial su mmary

Cost of new work to June 30, 1937___________________________                                           $115,199.45
Cost of maintenance to June 30, 1937__                                                                   59, 786. 77
      Total cost of permanent work to June 30, 1937 ________  __                                         174, 986. 22
Net total expenditures                                                                                   174, 986. 22
Total amount appropriated to June 30, 1937_____________________                                          174, 986. 22

       Fiscal year ending June 30                   1933         1934             1935         1936                1937


Cost of new work ..-
Cost of maintenance-------------
                           ..               --        ----    $1,977. 32 --------------         $1, 500--
Total expended....-        ......---------------   -----        1,977.32           ---- -        1,500      -          --   -

Allotted.....--------------.--.---------.            $1,000     3,009.16       -$1,501.99             400 ..........


Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937                        ---------------------------                               $1, 500. 00
I alance available for fiscal year 1938_                                                                     1, 500.~00

Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance ------------------------                                    --                      100.00
   1 Exclusive of available funds.

   14. CHANNEL         CONNECTING                   THOROUGHFARE                    BAY       WITH        CEDAR
                                                   BAY, N. C.

   Location.-Thoroughfare Bay is on the north side of Core Sound,
about 6 miles west of the end of the peninsula at the junction of
Core and Pamlico Sounds. It lies about 30 miles by the boat route
through Core Sound easterly from Beaufort, N. C. (See IT. S. Coast
and Geodetic Survey Chart No. 1233.)
   Existing project.-This provides for a channel 5 feet deep and 50
feet wide on bottom to connect Thoroughfare Bay and Cedar Bay.
The length of this channel is about 11/2 miles. There is no lunar tide
in the channel or waterway, variations in the level of the water sur-
face being due entirely to the action of the wind. Ordinary storms
will cause a variation of 1 foot above or below the mean stage, while
severe storms may cause a variation of as much as 3 feet.
   The estimate of cost for new work, revised in 1919, was $9,000.
The latest (1928) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 1125, 63d Cong., 2d sess.). The latest
published map is in the project document.
   l'erminal facilities.-There are no wharves on the waterway and,
as it is only a part of a through waterway, none are deemed necessary.
   Operations and results during fiscal year.-The work for the year
consisted of surveys. The cost was $499.05. all for maintenance.
The expenditures were $481.05.
   Condition at end of fiscal year.-The project was completed in
1921. At the close of the year the governing low-water depth was
          RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                      483
31/2 feet. The total costs under the existing project to June 30, 1937,
have been $9,000 for new work and $8,499.05 for maintenance, a total
of $17,499.05. The total expenditures have been $17,481.05.
   Proposed operations.-The balance unexpended July 1, 1937,
$8,518.95, will be applied to the maintenance of the channel as
-follows:
Accounts payable June 30, 1937--_______----------------------------------   $18.00
Removing 40,000 cubic yards of material under contract, between
July 1 and Sept. 30, 1937 ----  -------------------------                8,500. 95

        Total for all work----------------------------------------                                       8, 518. 95
  No work is proposed during the fiscal year 1939, as it is believed
that no maintenance dredging will be required.
                                  Cost and financial summary

Cost of new work to June 30, 1937------------------------------                                         $9, 000. 00
Cost of maintenance to June 30, 1937_----------------------------                                        8, 499. 05

        Total cost of permanent work to June 30, 1937                                     _             17, 499.05
Minus accounts payable June 30, 1937                                                                          8. 00
                                                                                                             1--------------------------

        Net total expenditures_----      __----------17,                                                   481. 05
Unexpended balance June 30, 1937 ____________                                                            8, 518. 95

        Total amount appropriated to June 30, 1937----------                                            26,000. 00

        Fiscal year ending June 30           1933               1934           1935           1936          1937


Cost ofnew work....
Cost of maintenance------------                     ------------------------                                 $499.05

Total expended        ----------------------------------------------------------------                        481.05
Allotted---      -------------------------------    -----        $5, 000       -$5, 000       $5, 000       4,000.00


Balance unexpended July 1, 1936--------------------------------.                                        $5,000.00
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934------------------------------------------------                                          4, 000. 00
      Amount to be accounted for_-------------------------        9,000. 00
Gross amount expended-----------------------------------------481.       05
      Balance unexpended June 30, 1937----------- ---------------                                        8, 518. 95
Outstanding liabilities June 30, 1937__________________    799. 39
                                                          $__
Amount covered by uncompleted contracts______________ 6,759.99
                                                                                                         7, 559. 38
        Balance available June 30, 1937_____                                                              959.
                                                                                                          9_________________
                                                                                                               57
                             15. BEAUFORT HARBOR, N. C.

  Location.-This harbor is located just inside Beaufort Inlet and
extends to the Norfolk Southern Railroad bridge across Newport
River. It is about 11/2 miles square and lies between Core and Bogue
Sounds. (See U. S. Coast and Geodetic Survey Chart No. 420.)
  Previous projects.-Adopted by River and Harbor Act of July 4.
1836. The cost and expenditures were $5,000 for new work. For
further details see page 1803 of Annual Report for 1915.
  Existing project.-This provides for the stopping of erosion at
the inlet by ietties and sand fences at Fort Macon and Shackleford
484      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Points and other shore protection; for a channel 100 feet wide and
12 feet deep at mean low water in Bulkhead Channel and Gallants
Channel and the same depth, with width varying from 200 to 400
feet, in front of the town of Beaufort; and the construction of a
stone bulkhead extending from Town Marsh across Bird Shoal to
the westerly end of Carrot Island. The distance from the inlet to
the upper end of Gallants Channel is about 5 miles. The average
rise of tide is 21/ feet at Beaufort and 31/2 feet at the inlet. The
extreme range of tides is 5.0 feet.
   The estimate of cost for new work, revised in 1930, exclusive of
amount expended on previous projects, was $262,800. The latest
 (1930) approved estimate for annual cost of maintenance is $17,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the erection of
jetties and the securing of a 9-foot channel (Annual Report for 1881,
p. 1013), as amended in 1890 (Annual Report for 1890, p. 1134), to
provide for a 7-foot channel to Beaufort; act of March 2, 1907,
authorized repairs to existing jetties at Fort Macon Point and addi-
tional jetties and shore protection; act of June 25, 1910, provided
for a 10-foot channel to the inland waterway and the turning basin
at Beaufort (H. Doc. No. 511, 61st Cong., 2d sess.); act of March
2, 1919, provided for an enlargement of the turning basin (H. Doc.
No. 1108, 63d Cong., 2d sess.); act of March 3, 1925, authorized
the bulkhead across Bird Shoal (Rivers and Harbors Committee Doc.
No. 8, 68th Cong., 2d sess.); and the act of July 3, 1930, authorized
an increased depth in Bulkhead and Gallants Channels and in front
of the town of Beaufort to 12 feet (H. Doc. No. 776, 69th Cong., 2d
sess.). The latest published map is in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 40 wharves contiguous to this har-
bor. They have a total frontage of about 1,400 feet. The existing
facilities are considered adequate for the present commerce. For
further details see page 550, Annual Report for 1932.
   Operation and results during fiscal year.-The work for the year
consisted of surveys. The cost and expenditures were $1,327.53, all
for maintenance.
   Condition at end of fiscal year.--The project was completed in
1931. At the close of the year the governing low water depths were
as follows: Gallants Channel, 10.4 feet; Bulkhead Channel, 12 feet;
channel in front of Beaufort, 12 feet. The stone jetties and training
walls were in good condition. The total cost and expenditures under
the existing project to June 30, 1937, have been $269,667.38 for new
work and $185,959.74 for maintenance, a total of $455,627.12.
   Proposed operations.--The balance unexpended July 1, 1937,
$20,250.21, will be applied to maintenance by removing 91,000 cubic
yards of material from the harbor and approach channels under
contract, between July 1 and September 30, 1937.
   The additional sum of $17,500 can be profitably expended during
the fiscal year 1939, and will be applied as follows:
Dredging the harbor and approach channels under contract, during
June 1939-------------                -------------------------------- $13, 000
Repair existing jetties and training walls under contract, during May
and June 1939--------------------------------------------                4, 500
      Total for all work- --         -----------     __-                 17, 500
            RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                          485
                                      Cost and financial sumn'mary

Cost of new work to June 30, 1937_-----------------------------                                          $274, 667. 38
Cost of maintenance to June 30, 1937-_ _ __--___--_------------                                           185, 959. 74

           Total cost of permanent work to June 30, 1937------------460,                                         627. 12
Net total expenditures-_-------____-______--_                                                             460, 627. 12
                               ------------------------------
Unexpended balance June 30, 1937___                                                                        20,250. 21

           Total amount appropriated to June 30, 1937____--__----_---                                     480, 877. 33

       Fiscal year ending June 30                  1933          1934           1935              1936            1937


Cost of new work -..............--.----
                          -------------- $2, 943. 10
Cost of maintenance----____                                     $6, 000. 75   $1,216.45     $20, 584. 10         $1, 327. 53
                               _
Total expended--------_--------------            4, 227.48    -23, 703. 28         394.09       21, 460.01        1,327.53
Allotted      -   _ _----------------------------1, 066. 90   -10, 605.84     17, 500.00 ------------             9, 000.00


Balance unexpended July 1, 1936...----------------------------                                               $12, 577. 74
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934 ------                                                                                          9, 000. 00
     Amount to be accounted for-        ____-                                  -            -                21, 577. 74
Gross amount expended     -------------                                                                       1,327. 53
      Balance unexpended June 30, 1937---------__-----------                                                 20, 250. 21
Outstanding liabilities June 30, 1937 ------------    $1, 869. 63
Amount covered by uncompleted contracts               15, 379.00
                                                                                                              17, 248. 63

           Balance available June 30, 1937---------------------------3,                                          001.58

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------------------------------------17,500. 00
  1Exclusive      of available funds.

  16. WATERWAY                 CONNECTING PAMLICO SOUND AND BEAUFORT
                                      HARBOR, N. C.

   Locatio.-This waterway begins at the southeast corner of Pam-
lico Sound, passing southwesterly through Wainwright Slue, Core
Sound, The Straits, and Taylors Creek to Beaufort Harbor, a total
length of 36.5 miles. (See U. S. Coast and Geodetic Survey Chart
No. 1233.)
   Pre-vious projects.-No previous project exists for this waterway
as a whole. The River and Harbor Act of March 4, 1913, authorized
a channel 23/4 miles long connecting Core Sound and Beaufort Har-
bor. The cost and expenditures prior to the adoption of the existing
project in 1922 were $20,000 for new work and $12,853.81 for main-
tenance, a total of $32,853.81. In addition, $10,000 contributed by
local interests was expended on new work.
   Existing project.-This provides for a channel 7 feet deep at mean
low water, with bottom width of 75 feet, extending from Pamlico
Sound by way of Wainwright Channel and Core Sound to Beaufort
Harbor, a distance of 36.5 miles, and for a channel 7 feet deep and
75 feet wide from the main channel in Core Sound to the town of
Atlantic. There are no lunar tides in the northern portion of Core
Sound. Ordinary storms cause a variation of 1 foot above or below
486       REPORT OF CHIEF OF ENGINEERS,       U. S. ARMY,   1937


mean stages, increasing to as much as 3 feet during severe storms.
The mean tidal range at Beaufort is 21/2 feet, gradually diminishing
toward the upper end of Core Sound.
   The estimate of cost for new work, revised in 1937, was $84,400,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $11,750.
The existing project for that portion of the waterway connecting
Beaufort Harbor and Core Sound was adopted by the River and
Harbor Act of September 22, 1922 (H. Doc. No. 88, 67th Cong., 1st
sess.).
   Extension of the waterway to Pamlico Sound via Wainwright
Channel was authorized by the Public Works Administration Janu-
ary 3, 1934, and adopted by the River and Harbor Act of August 30,
1935 (H. Doc. No. 485, 72d Cong., 2d sess.), and the portion of the
project providing for a channel from the main channel in Core
Sound to the town of Atlantic was adopted by the River and Harbor
Act approved August 26, 1937 (Rivers and Harbors Committee Doc.
No. 92, 74th Cong., 2d sess.). The latest published maps are con-
tained in the above-mentioned documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are five wharves on the portion of the
waterway connecting Core Sound with Beaufort Harbor. They have
a total frontage of about 200 feet. Between the eastern end of this
portion of the waterway and Pamlico Sound there are 12 small
wharves, all privately owned, but generally open to use by the public
when not required by the owners. A public wharf has been provided
at Atlantic. The existing facilities on the portion of the waterway
connecting Core Sound and Beaufort Harbor are considered adequate,
but additional wharves are needed at several of the communities
along Core Sound.
   Operations and results during fiscal year.-The work for the year
consisted of surveys. The cost and expenditures were $70.93, all for
maintenance with regular funds. The modification of the project
in accordance with the plan contained in Rivers and Harbors Com-
mittee Document No. 92, Seventy-fourth Congress, second session,
was completed in February 1937, under a Works Progress Admin-
istration project at a total cost of $18,584.53, of which $13,171.72 was
paid from Works Progress Administration funds, and $5,412.81 was
paid by the local sponsors.
   Condition at end of fiscal year.-The portion of the project pro-
viding for a waterway from Pamlico Sound through Core Sound
to Beaufort was completed with regular and Public Works funds
in 1934, at a saving of $3,745 under the estimated cost. At the close
of the year the project depth of 7 feet at mean low water was avail-
able. The total costs under the existing project to June 30, 1937
 (Works Progress Administration project not included) have been
$27,655.04 for new work and $36,058.80 for maintenance from regu-
lar funds, and $40,000 for new work from Public Works funds, a
total of $103,713.84. The expenditures were $63,713.84 from regular
funds and $40,000 from Public Works funds, a total of $103,713.84.
   The portion of the project providing for a side channel into the
town of Atlantic was completed under the Works Progress Admin-
istration in February 1937. Works Progress Administration funds
              RIVERS AND HARBORS-WILMINGTON,                                       N. C., DISTRICT            487
expended amounted to $13,171.72, and local interests contributed
$5,412.81, making the total cost $18,584.53.
    Proposed operations.-The balance unexpended July 1, 1937, $11,-
929.07, will be applied to maintenance by removing 55,000 cubic
yards of material from the waterway, under contract, between July
1 and September 30, 1937.
  The additional sum of $11,000 can be profitably expended during
the fiscal year 1939, and will be applied to maintenance dredging
in the waterway, under contract, during May 1939. The side chan-
nel into the town of Atlantic was completed by the Works Progress
Administration, therefore no funds for new work will be needed.
                                        Cost and financial summary
Cost of new work to June 30, 1937--------------------------- 12 $87, 655. 04
Cost of maintenance to June 30, 1937---------------------------  48, 912. 61
           Total cost of permanent work to June 30, 1937                            ----------         136, 567. 65
Net total expenditures--------------------------------------                                           136, 567. 65
Unexpended balance June 30, 1937------------------                                       --             11, 929. 07

           Total amount appropriated to June 30, 1937-------------                                     148. 496. 72

    Fiscal year ending June 30             1933           1934              1935              1936         1937


Cost of new work               -         .       _
                        -__________________-------          $14. 75       $39, 985. 25
Cost of maintenance ______ _________----   ---            5, 494. 72   ----------------------------           $70.93

       Total cost___________                              5, 509. 47       39, 985. 25   --..-.---.-           70.93

Total expended ________________5,                           459. 47        40, 035. 25 .----------.---         70.93

Allotted_ .__.....   _________     __                    46, 894. 72      -1,400. 00 --------------        12, 000. 00


Amount allotted from War Department Appropriation Act ap-
  proved April 9, 1935----------------------------------------_                                        $12, 000. 00
Gross amount expended-----------------------------------------                                               70.93

      Balance unexpended June 30, 1937------------------------11, 929. 07
Outstanding liabilities June 30, 1937----------------- $1, 040. 02
Amount covered by uncompleted contracts ------------- 9, 295. 00
                                                                   10, 335. 02
          Balance available June 30, 1937---------------------------                                     1, 594. 05
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance -- - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - -        11, 000. 00
   1 Includ es $40,000 from Public Works funds.
   2 In addition, $10,000 expended from contributed funds on new work.
   a Exclusive of available funds.

          17. CHANNEL FROM BACK SOUND TO LOOKOUT BIGHT, N. C.

  Location.-This channel extends from a point near the eastern end
of Harkers Island, about 8 miles east of Beaufort, through the shal-
low waters of Back Sound and Lighthouse Bay, to and through
Shackleford Banks, and into the Atlantic Ocean at Lookout Bight,
and is about 4 miles long (see U. S. Coast and Geodetic Survey
Chart No. 421).
  Ewisting project.-The project provides for a channel 50 feet wide
and 5 feet deep at mean low water from deep water in Back Sound,
488      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

through Shackleford Banks to deep water in Lookout Bight. The
mean range of tide is 3.8 feet in Lookout Bight and 1.3 feet in Back
Sound, and the extreme range is 8.2 feet in Lookout Bight and 3.8 feet
in Back Sound.
   The estimate of cost for new work, made in 1937, is $50,000. The
latest (1937) approved estimate for annual cost of maintenance is
$11,000.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 251, 75th Cong., 1st sess.). The
latest published map is in the project document.
   Local cooperation.-The project provides that local interests fur-
nish, free of cost to the United States, necessary rights-of-way and
suitable spoil-disposal areas for new work and for subsequent main-
tenance, as required, and release the United States from all claims
for damages attributable to the work of improvement. These provi-
sions have not been complied with.
   Terminal facilities.-There are three small timber wharves con-
tiguous to the channel, two of which are owned by the Coast Guard
Service. They are generally open to use by all without charge when
not required by their owners. The existing facilities are considered
adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project. A depth of about 11/2 feet at mean low water is
available at the entrance in Lookout Bight, increasing to 5 feet in
the narrow portion of the Drain. The outlet from the north end of
the Drain to Lighthouse Bay is obstructed by a shoal projecting
about 1 foot above mean low water. From Lighthouse Bay to deep
water near Harkers Island the limiting depth is about 2 feet at
local low water, and the average depth is about 3 feet. No expendi-
tures have been made.
   Proposed operations.-No funds are on hand and no work is pro-
posed during the fiscal year ending June 30, 1938.
   The sum of $50,000 can be profitably expended during the fiscal
year ending June 30, 1939, and will be applied to new work by the
removal of 250,000 cubic yards of material, under contract, between
September 1 and December 31, 1938.
                        Cost and financial summary

Cost of new work to June 30, 1937_______________________________
Cost of maintenance to June 30, 1937_

      Net total expenditures
Total amount appropriated to June 30, 1937_

Amounted (estimated) required to be appropriated for completion
of existing project     -------------------------     ---------     $50, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work _-----------____.___.                         50, 000

18. INLAND    WATERWAY,      BEAUFORT      TO CAPE FEAR RIVER,        N. C.,
          INCLUDING WATERWAY          TO JACKSONVILLE,       N. C.

  Location.--This waterway begins at Beaufort Harbor and follows
the general line of the coast, passing through Bogue Sound and the
sounds and marine marshes to the south, to a point in Myrtle Sound
       RIVERS AND HARBORS-WILMINGTON,         N. C., DISTRICT    489

just north of Carolina Beach, crossing the mainland at this point
into Cape Fear River, which it enters about 16 miles below Wilming-
ton. (See U. S. Coast and Geodetic Survey Charts Nos. 1234 and
1235.)
   Previous projects.-Adopted by River and Harbor Acts of July 4,
1836, March 3, 1837, July 7, 1838, August 2, 1882, March 3, 1905,
June 25, 1910, September 19, 1890, August 5, 1886, and August 8,
1917. The cost and expenditures were $198,706.92 for new work and
$107,633.94 for maintenance, a total of $306,340.86. For further
details see page 1803 of Annual Report for 1915, and page 585 (for
New River), page 587 (for waterway between New River and Swans-
boro), and page 589 (for waterway between Beaufort Harbor and
New River; that is, portion between Beaufort and Swansboro),
Annual Report for 1917; and Annual Report for 1926, page 533.
   Existing project.-This provides for a waterway 12 feet deep at
mean low water with a bottom width of 90 feet, extending along the
coast from Beaufort, N. C., to the Cape Fear River, a distance of
93.5 miles, with such modifications in routing as the Chief of Engi-
neers may find desirable and economical, and including the provision
of a tidal lock near the Cape Fear end and a highway bridge in its
vicinity. The project also provides for a channel 10 feet deep at
mean low water and 90 feet wide in New River to the Atlantic
Coast Line Railroad bridge at Jacksonville, N. C., a distance of
21 miles, and for a side channel 12 feet deep and 90 feet wide to a
turning basin of the same depth, 200 feet wide and 350 feet long,
opposite the principal wharves at Swansboro.
   The tidal range varies from 31/2 feet at the inlets to 1 foot at
points between. The tidal range for New River varies from 31/2
feet at New River Inlet to 1 foot at the head of the marshes, and
nothing at Tar Landing, 31 miles above. At the Beaufort end of
this waterway the extreme range of tide is 5.0 feet. At the various
inlets between Beaufort Inlet and New River Inlet the extreme range
of tides is probably from 4.5 to 5 feet. At the Cape Fear River end
the mean range is 3.5 feet.
   The estimate of cost for new work, revised in 1937, is $3,923,300,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $156,400.
   The existing project was adopted by the following river and harbor
acts: The act of August 8, 1917, provided for a 3-foot channel to
Jacksonville (H. Doc. No. 1775, 64th Cong., 2d sess.), the act of
January 21, 1927, provided for a 12-foot channel, Beaufort to Cape
Fear River (H. Doc. No. 450, 69th Cong., 1st sess.), the act of
August 30, 1935, provided for the 10-foot channel to Jacksonville
 (H. Doc. No. 67, 74th Cong., 1st sess.), and the act of August 26,
1937, provided for the 12-foot side channel into Swansboro (Rivers
and Harbors Committee Doc. No. 16, 75th Cong., 1st sess.). The
latest published maps are in the two-last-mentioned documents.
   Local cooperation.-Local cooperation required in connection with
the 12-foot channel from Beaufort to Cape Fear River has been
fully complied with. The project for a channel 10 feet deep and 90
feet wide in New River to Jacksonville, provides that local interests
furnish free of cost to the United States the necessary right-of-way
and all disposal areas, shall extinguish all claims for damages to
oyster beds, and construct adequate terminal facilities at Jackson-
490      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

ville satisfactory to the Chief of Engineers and the Secretary of
War; and the project for a 12-foot side channel into Swansboro,
provides that local interests furnish, free of cost to the United States,
suitable spoil-disposal areas for new work and for subsequent main-
tenance as required, and agree to construct adequate terminal facil-
ities at Swansboro. These requirements have not been complied with.
   Terminal facilities.-The north end of this waterway is in Beau-
fort Harbor and harbor at Morehead City, the terminal facilities of
which are described in the reports for those improvements in this
report. There are 16 wharves between Morehead City and Swans-
boro, 10 at or near Swansboro, 9 on New River, of which 5 are at or
near Jacksonville, and 16 between New River and Cape Fear River.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The work for the year
consisted of maintenance dredging with Government plant and hired
labor. The U. S. pipeline dredges Henry Bacon and Morgan, work-
ing between July 23 and November 4, 1936, and between May 7
and June 10, 1937, respectively, removed 7,784 cubic yards of ma-
terial from section 1, 78,832 cubic yards from section 2, 21,344 cubic
yards from section 3, 73,296 cubic yards from section 4, and 18,579
cubic yards from section 5, a total of 199,835 cubic yards. As a
result of this work the project dimensions were practically available
throughout the year. The cost and expenditures of this work were
$34,602.76, all for maintenance.
   Condition at end of fiscal year.-The portion of the project pro-
viding for a 12-foot channel between Beaufort and Cape Fear River
was completed in 1932. No work has been done on the 10-foot chan-
nel in New River to Jacksonville, nor on the 12-foot side channel into
Swansboro. The project is about 97 percent completed. At the
close of the year the available mean low water depths were 12 feet
between Beaufort and Cape Fear River, 5 feet in New River to
Jacksonville, and 10 feet to Swansboro. The total costs and expendi-
tures of the existing project to June 30, 1937, have been $2,243,507.82
for new work and $372,114.43 for maintenance, a total of $2,615,622.25.
   Proposed operations.-No funds were on hand July 1, 1937. An
allotment made during July 1937 ($75,000) will be applied as
follows:
Maintenance: Dredging 1,000,000 cubic yards of material from the
waterway between Beaufort and Cape Fear River, with the Govern-
ment dredge Henry Bacon, as needed, between July 1, 1937, and
June 30, 1938-------------------------------------------------- $75, 000
  The additional sum of $273,300 can be profitably expended during
the fiscal year 1939 and will be applied as follows:
New work :
    Dredging 782,000 cubic yards of material from proposed 10-foot
     ' channel in New River, between the Inland Waterway and Jack-
       sonville, under contract, between Jan. 1 and June 30, 1939_____ $117, 300
    Dredging 20,000 cubic yards of material from proposed 12-foot
       side channel into Swansboro, under contract, during December
       1938--------------------------------------------------------       6,000
Maintenance: Dredging between Beaufort and Cape Fear River, with
  Government plant and hired labor, as needed, between July 1, 1938,
  and June 30, 1939__-----___--   _________________ _____--____----     1150,000
      Total for all work         _____
                                  '    _27______________________         73, 300
               RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                                             491
                                                    Cost and financial summary

'Cost of new work to June 30, 1937___------------------------                                                            $2, 442, 214. 74
Cost of maintenance to June 30, 1937___---------------------                                                                 479, 748. 37

      Total cost of permanent work to June 30, 1937----------                                                              2,921, 963. 11
Net total expenditures----------------------------------                                                                   2,921, 963.11
Total amount appropriated to June 30, 1937---_-------------                                                                2, 921, 963. 11

            Fiscal year ending June 30                                1933           1934           1935               1936             1937


Cost of new work.--------------------- $28,837. 62
Cost of maintenance                 -------------------             79, 966. 48   $60,022 28     $61, 449.17        $66,397. 39       $34, 602. 76

        Total cost........................----------------------   108, 804. 10    60, 022. 28    61, 449.17         66, 397. 39       34, 602.76

Total expended.....................---------.....-------------     125, 418. 33    60, 022. 28    61, 449.17         66, 397. 39       34, 602. 76
Allotted......----------------------------------                   116,476.68      97,668.21      55, 000.00 ------------               7,147.91


Balance unexpended July 1, 1936 ---------------------------- $27, 454. 85
Amount allotted from War Department Appropriation Act ap-
proved Apr. 9, 1935------------------------------ -------     7,147. 91

      Amount to be accounted for--------------------------                                                                         34, 602. 76
Gross amount expended---------------------------------                                                                             34, 602. 76
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937----------------------------------                                                                         75, 000. 00
Balance available for fiscal year 1938_------------------------                                                                    75, 000. 00

Amount (estimated) required to be appropriated for completion
of existing project 1----------  --------                                                                                         123, 300. 00
Amount that can be profitably expended in                                              fiscal    year ending
    June 30, 1939:
      For new work -__-----------------_----                                                                                       123, 300. 00
        For maintenance 1-------------------------                                                 ---         __              150, 000. 00

            Total -------------------------------------------------                                                            273, 300. 00
    1 Exclusive of available funds.

19. INTRACOASTAL                              WATERWAY FROM CAPE FEAR RIVER, N. C., TO
                                                  WINYAH BAY, S. C.

   Location.-This waterway begins at Southport, N. C., and follows
in general a route from the Cape Fear River up Elizabeth River 6.7
miles to a point near its headwaters; thence through high ground
2.6 miles to the headwaters of Davis Creek; thence down Davis
Creek to the sounds and salt marshes and through the latter to Little
River, S. C., a distance of 24.2 miles; thence up Little River 5.7
miles to its headwaters; thence through high ground 21.8 miles to
the head of Socastee Creek; thence down Socastee Creek 6.5 miles
to the Waccamaw River, and down the latter 27 miles to Winyah
Bay; a total distance of 94.5 miles. (See U. S. Coast and Geodetic
Survey Charts Nos. 1236 and 1237.)
   Existing project.-This provides for a waterway 12 feet deep at
mean low water with a bottom width of not less than 90 feet, between
Cape Fear River, N. C., and Winyah Bay, S. C., a distance of ap-
proximately 94.5 miles, and for the construction of three bridges
crossing the waterway in Horry County, S. C. The mean range of
tide on Cape Fear bar is 4.5 feet; at inlets 4 feet, varying to 2 feet at
points midway between inlets and in Winyah Bay, at Georgetown ,
3.3 feet.
492     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimate of cost for new work made in 1937 is $7,319,000. The
latest (1937) approved estimate for annual cost of maintenance is
$61,500.
   The existing project for a waterway 8 feet deep and 75 feet wide
was adopted by the River and Harbor Act of July 3, 1930 (H. Doc.
No. 41, 71st Cong., 1st sess.), and the project for a waterway 12 feet
deep and 90 feet wide was adopted by the River and Harbor Act of
August 26, 1937 (Rivers and Harbors Committee Doc. No. 6. 75th
Cong., 1st sess.). The latest published map is in the last mentioned
document. The construction of bridges in Horry County was au-
thorized September 6, 1933, by the Public Works Administration and
by the River and Harbor Act of August 30, 1935 (Rivers and Harbors
Committee Doc. No. 14, 72d Cong., 1st sess.).
   Local cooperation.-The project for a 12-foot waterway provides
that local interests furnish, free of cost to the United States, neces-
sary rights-of-way and spoil-disposal areas for new work and sub-
sequent maintenance and bear the costs of all necessary modifications
to bridges. These requirements have not been complied with. All
prior requirements have been fully complied with.
   Terminal facilities.-There are numerous wharves and landings
along the present waterways which are used mostly for shipping
agricultural products. These wharves are of the open-pile and
timber type. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-The work for the year,
all with regular funds, consisted of maintenance dredging and snag-
ing with Government plant and hired labor. The U. S. dredge
Colonel G. P. Howell removed 363,242 cubic yards of material from
the most objectionable shoals between Little River Bridge and a
point 1 mile south of Socastee Bridge, at a cost of $45,215.38. The
U. S. derrickboat No. 6 removed a total of 3,675 snags, stumps, and
sunken logs, and 240 cords of floating debris from the channel be-
tween Little River and Enterprise, at a cost of $8,565.79. The U. S.
dredge Henry Bacon removed 35,675 cubic yards of material from 5
shoals between Lockwoods Folly River and Little River at a cost of
$8,927.32. The cost of supervision and surveys was $5,936.34. As a
result of this work a depth of 8. feet was practically available
throughout the year. The total cost for the year, all for mainte-
nance. was $68,644.83. The expenditures were $51,366.80.
   Condition at end of fiscal year.-The existing project is 36 percent
completed. The 8-foot waterway was completed in 1936 at a saving
of approximately $909,000 under the estimated cost. No work has
been done on the portion of the project providing for a 12-foot water-
way. At the close of the fiscal year the governing mean low water
depths were 8 feet from the Cape Fear River to Shallotte River,
where a short shoal affords a depth of only 6.7 feet; thence 8 feet
to Little River Bridge; thence 7 feet to Socastee Bridge; thence 8
feet to Winyah Bay.
   The total costs under the existing project to June 30, 1937, have
been $4.893,982.37, of which $2,642,277.44 was for new work and
 $186,267.99 for maintenance, from regular funds, and $2.065,436.94
for new work from Public Works funds. The total expenditures
were $4,884,068.59, of which the sum of $2,818,631.65 was from
regular funds and $2,065.436.94 from Public Works funds.
        RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                   493
  Proposed operations.-The balance unexpended July 1, 1937,
$64,839.36, together with an allotment of $44,000 made during July
1937 ($108,839.36), will be applied as follows:
Accounts payable June 30, 1937 ...      __________-_____      _ __ _ $12, 877.'07
Maintenance :
    Continuation of dredging to restore project dimensions south
      of the combination bridge, mile 23.4, and in the vicinity of
      White Point Creek, mile 15, with the U. S. pipe-line dredge
      Colonel G. P. Howell and hired labor, July 1-20, 1937---------   8, 000. 00
    Continuation of snagging in the southerly 20 miles of the sec-
      tion, with the U. S. derrick boat No. 6 and hired labor, July
      1-31, 1937_----------------------------                          1,500. 00
    Construction of check dams in spillways and drainage ditches,
      including construction of diversion ditches where necessary,
      between Little River bridge and the combination bridge, with
      Government plant and hired labor, Nov. 1, 1937-Feb. 28, 1938_ 27, 000. 00
    Dredging to restore project dimensions from the north end of
      the project to the crossing of White Point Creek, mile 15, with
      the U. S. pipe-line dredge Colonel G. P. Howell and hired
                                     _
      labor, Mar. 14-May 31, 1938-_ ------------    _                 25, 000. 00
    Snagging in the southerly 20 miles of the section, with the
      U. S. derrick boat No. 6 and hired labor, May 1-31, 1938 .....   1,500. 00
    Maintenance surveys and supervision of the project, July 1,
      1937-June 30, 1938                  ----------------                           9, 962. 29
    Dredging as may be found necessary to restore project diamen-
      sions between Cape Fear River and Little River with Govern-
     ment plant and hired labor, July 1, 1937-June 30, 1938 ___-_                  23, 000.00

         Total for all work-------------------------------------                  108,839. 36
  The additional sum of $1,823,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1939, and will be applied as
follows:
New work: Dredging 16,733.600 cubic yards of material from the
waterway between Cape Fear River, N. C., and Winyah Bay,
  S. C., under contract between July 1, 1938, and June 30, 1939 _--_ $1,700,000
Maintenance :
    Dredging as may be found necessary to restore project dimen-
       sions between Little River and Winyali Bay with Government
       plant and hired labor, July 1, 1938-June 30, 1939-------------   100, 000
    Dredging as may be found necessary to restore project dimen-
       sions between Cape Fear River and Little River with Govern-
       ment plant and hired labor, July 1, 1938-June 30, 1939        ---------
                                                                         23, 000

                                               -
         Total for all work_______ --___________---          -   ______    _       1, 823, 000
                             Cost and financial summary

Cost of new work to June 30, 1937-------------------------                 2   $4, 707, 714. 38
Cost of maintenance to June 30, 1937 ------------------------                      186, 267. 99
      Total cost of permanent work to June 30, 1937                            4, 893, 982. 37
Undistributed costs June 30, 1937_    ----------------------
                                                         _                          2,963. 29

     Net total cost to June 30, 1937------------------------                   4, 896, 945. 66
Minus accounts payable June 30. 1937------------------------                       12, 877. 07

      Net total expenditures_                ------------                      4, 884, 068. 59
Unexpended balance June 30, 1937__-_                                 ---           64, 839. 36

       Total amount appropriated to June 30, 1937------                         4,948, 907. 95
  1 Includes $2,065.436.94 from Public Works funds.
    C osts reduced $2,549.17 by refundmient of funds.
494           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


   Fiscal year ending June 30                    1933                1934                1935                  1936                  1937


Cost of new work ............. $376, 112. 65                     $834, 609. 55
                                                                     -71,
                                                                                   $1, 413, 627. 19 $1, 055, 478. 08
                                                                                            124. 36      33, 173. 67
                                                                                                                               -.   $68, 644. 83
Cost of maintenance.....__..___  13, 237. 41

      Total cost       ------.................
                                   389, 350. 06 834, 609. 55                        1, 484, 751. 55       1, 088,651. 75             68,644. 83

Total expended--....    ------------ 377,788. 68                  882, 774. 59      1, 308, 452. 25       1, 298, 223.97             51;366. 80
                                                                                                                           '
Allotted_-.-.. -----------------              517,771.19        1, 562,411.03         855, 073. 64          877, 200. 00            -7,147:91


Balance unexpended July 1, 1936_                                                                                           $123, 354. 07
Deductions on account of revocation of allotment ------                                                                       7,147.91

      Net amount to be accounted for                                                                                           116, 206.16
Gross amount expended ---- _____- -- __-_____                                              $56, 773. 38
Less reimbursements collected.________..____                                                 5, 406. 58
                                                                                                                               51, 366. 80
      Balance unexpended June 30, 1937_                                                                                        64, 839. 36
Outstanding liabilities June 30, 1937_                                                                                         12, 877.07

     Balance available June 30, 1937_                                                                                           51, 962. 29
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_                                                                                                        44, 000. 00

Balance available for fiscal year 1938                                      _____________                                       95, 962.29

Amount (estimated) required to be appropriated for comple-
tion of existing project _---                                                                                        1, 700, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 8- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                    1, 700, 000. 00
                      - -- --- -- --- -- --- -- -- -- -                       --- -- --
   For maintenance 3___                                                                                                  123, 000. 00
          Total 8-     --   - -- - - -   - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                     --               1, 823, 000. 00
   aExclusive of available funds.

                              20. MOREHEAD CITY HARBOR, N. C.

  Location.--This harbor is situated on the northern shore of Bogue
Sound, adjacent to Beaufort Harbor and Inlet. New Bern, N. C.,
the nearest city of importance, is about 43 miles by inland waterway
to the northwest. (See U. S. Coast and Geodetic Survey Chart
No. 420.)
  Previous project.-The channel across the ocean bar was formerly
improved under the title of Beaufort Inlet, N. C. The project was
adopted by the River and Harbor Act of March 3, 1905 (H. Doc.
No. 563, 58th Cong., 2d sess.). The cost and expenditures on this
project prior to the adoption of the existing project in 1935 were
$44,484.24 for new work and $284,557.44 for maintenance, a total of
$329,041.68. (For further details see p. 470 of Annual Report for
1935.)
  Existing project.-This provides for a channel 30 feet deep and
400 feet wide across the ocean bar at Beaufort Inlet, thence same
depth and 300 feet wide to the marine terminals at Morehead City,
enlarged to 600 feet to form a turning basin at that point, and for
construction of jetties at the inlet; for a channel 12 feet deep and 100
      RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT             495
feet wide from the 30-foot channel to Sixth Street, Morehead City,
thence same depth and 200 to 400 feet wide to Tenth Street, thence 6
feet deep and 75 feet wide to deep water in Bogue Sound. The
average rise of the tide is about 21/2 feet at Morehead City and 31/2
feet at the inlet. Observations made in 1907 showed an extreme
range of tide of 4.8 feet.
   The estimate of cost of new work, revised in 1936, is $1,610,000.
The latest (1936) approved estimate for annual cost of maintenance
is $89,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910 (H. Doc. No. 649, 61st Cong.,
2d sess.) provided for channels 10 feet deep; the act of July 3, 1930,
provided for the 12-foot channel and for the 6-foot channel to Bogue
Sound (H. Doc. No. 105, 70th Cong., 1st sess.). The 30-foot channel
across the bar to the marine terminals was included in the approved
program for public works July 5, 1934, under the National Indus-
trial Recovery Act of 1933 and was adopted by the river and harbor
act of August 26, 1937 (Senate Commerce Committee Doc., 74th
Cong., 1st sess.). This includes and supersedes the project formerly
designated "Beaufort Inlet, N. C." The latest published map is in
House -Document No. 105, 70th Congress, first session.
   Local cooperation.-The project provides that local interests fur-
nish, free of cost to the United States, spoil-disposal areas as re-
auired for new work and for future maintenance and all other lands
needed for the improvement, and to the further condition that local
interests give assurances satisfactory to the Secretary of War that
an adequate terminal open to the public on uniform terms will be
available by the time the channel is completed. Terminals have
been completed and spoil disposal areas for new work furnished.
Lands needed in connection with the construction of jetties have not
been furnished.
   Terminal facilities.-There are 37 wharves along the main water
front of the town, with a total frontage of about 1,182 feet. The
marine terminals provide 1,350 feet of berthing space with a depth
alongside of 27 feet at mean low water, and facilities for transfer
of cargoes between rail and water carriers. The existing facilities
are considered adequate for existing and prospective commerce.
   Operations and results during fiscal year.-The work for the year
consisted of dredging the ocean bar channel with Government plant
and hired labor, and dredging the inner channel and turning basin
at the ocean terminals by contract. The U. S. hopper dredge
Absecon, between July 1 and August 20, 1936, removed 268,290 cubic
yards of material from the ocean bar channel. The contractor, be-
tween July 1 and 28, 1936, removed 215,927 cubic yards of material
from the inner channel and turning basin, completing the contract.
As a result of this work all dredging provided for in the existing
project was completed in August 1936. The cost of this work was
$48,110.53, of which $48,043.74 was for new work with Public Works
funds and $66.79 was for maintenance with regular funds. The ex-
penditures were $103,899.42 from Public Works funds and $66.79
from regular funds, a total of $103,966.21.

     20196-37--pt. 1--32
496        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


   Condition at end of fiscal year.-The portion of the existing project
providing for a 12-foot channel to Morehead City was completed in
1931, and the portion providing for the 30-foot channel to the
terminals, in 1936. No work has been done on the jetties proposed
at Beaufort Inlet. The existing project is 40 percent completed.
At the close of the fiscal year a channel 29.2 feet deep at mean low
water was available from the ocean to the terminals at Morehead
City, 12 feet from deep water in the outer harbor to the foot of
Tenth Street, Morehead City, and thence 6 feet from the western
end of the inner harbor to Bogue Sound. The total costs and ex-
penditures under the existing project, to June 30, 1937, have been
$629,071.22, of which the sum of $75,595.36 was from regular funds
and $553,475.86 from Public Works funds. Of the cost $610,267.44,
including $553,475.86 Public Works funds, was for new work and
$18,803.78 for maintenance.
   Proposed operations.-The balance unexpended July 1, 1937, to-
gether with an allotment of $50,000 made during July 1937 ($62,-
933.21), less $34,000 to be revoked, will be applied as follows:
Maintenance :
   Dredging 50,400 cubic yards of material from the harbor in
      front of Morehead City and approach channels, under con-
      tract, between July 1 and Sept. 30, 1937---__---------------                     $12, 933.21
   Dredging shoals from channel through the inlet and channel
      just inside the inlet with the Government dredge Comstock,
      November, 1937_-----------------------------------      --                        16, 000. 00

          Total for all work__ ______        _.--_        _--_--             --         28,    33. 21
  The additional sum of $80,000 can be profitably expended during
the fiscal year 1939, and will be applied as follows:
Maintenance:
   Dredging the channel through the inlet and channel just inside
      the inlet with the Government dredge Comstock, between
       Jan. 1 and Mar. 15, 1939__________________________________                         $50, 000
      Dredging the channel from a point just inside the inlet to the
       Morehead City terminals and from the turning basin in front
       of the terminals, under contract, during January and Feb-
       ruary 1939______           _    _       _--------------------                          30, 000
          Total for all work__                       __                          -            80, 000
  The dredged channel has not shoaled sufficiently to justify the
construction of jetties for its maintenance, therefore no funds for
new work are requested for expenditure during the fiscal year 1939.
                             Cost an~d financial summary
                       MAINTENANCE     AND   IMPROVEMENT         FUNDS

Cost (of new work to June 30, 1937_-------------                                      $101, 275.82
Cost (of maintenance to June 30, 1937 __-                  ---------                   303, 361. 22

       Total cost of permanent work to June 30, 1937---                          --    404, 637. 04
Net ttotal expenditures________  ______________                                        404, 637. 04
Unex pended balance June 30, 1937__---      --                         --   --          12, 933. 21

       Total amount appropriated to June 30, 1937-....                                 417, 570. 25
              RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                                                                497

           Fiscal year ending June 30                             1933                   1934                  1935                    1936               1937

Cost ofnew work.----------                         ------------------------------------                                            ----------
Cost of maintenance .___...-
                        -_                  .......            $20, 192. 01--------                   ... $55,000               ----                        $66. 79
Total expended____-----------------                   ----      29, 947.05       -------                         55,000     ----------                       66. 79
Allotted -----------------                             12, 609. 68 ----------
                                             ------------                                                        63, 000                                  5, 000. 00


Balance unexpended July 1, 1936---------------------------                                                                                           $8, 000. 00
Amount allotted from War Department Appropriation Act ap-
    proved Apr. 9, 1935_                          _                                                         --                                         5, 000.00

      Amount to be accounted for                                                                                                                     13, 000. 00
Gross amount expended                                                      -                          ---                 --                              66. 79

      Balance unexpended June 30, 1937_                                                                                                              12, 933. 21
Outstanding liabilities June 30, 1937__                                                       --------------
                                                                                                      -            1,01.6
                                                                                                                  $1, 011. 68
Amount covered by uncompleted contracts_                                                                            8, 517.60
                                                                                                                                                      9, 529. 28

     Balance available June 30, 1937        --                                                                                                        3, 403. 93
Amount allotted from War Department Civil Appropriation Act
    approved July 19, 1937--------------__                                                                                  -                         0,000. 00
                                                                                                                                                     5-------

            Balance available for fiscal year 1938                                                                                                   53, 403. 93

Amount (estimated) required to be apropriated for completion
of existing project -------------------------------         1, 000, 000. 00
Amount that can be profitably expended in fiscal year ending
    Jutne 30, 1939, for maintenance 1-----------                                                                 ----------                          80, 000. 00

                                                       PUBLIC WORK                    FUNDS

Cost of new work to June 30, 1937----- 1                                                          1         1           1              __        553,475. 86
Cost of maintenance to June 30, 1937__

      Total cost of permanent work to June 30, 1937                                                                --            ---            553, 475. 86
Net total expenditures-                                                                                                                         553, 475. 86
                                                                                                                                                --
Total amount appropriated to June 30, 1937-                                                                                                     553, 475. 86


    Fiscal year ending June 30                         1933                    1934                    1935                     1936                     1937


Cost of new work--------....                 .
                                            -------------        --------------------------                                $505, 432. 12                $48, 043. 74
C ost of m ain tenan ce-.-...    -..........................                ........................... .........................
Total expended          __........_____..______________                                                                     449, 576. 44                103, 899. 42
Allotted------------.---                                               _
                                             ------------------- -------                            -
                                                                                                -----              -        555, 000. 00                -1, 524. 14


Balance unexpended July 1, 1936--__----------      ______________ $105, 423. 56
Deductions on account of revocation of allotment ________________    1, 524. 14
            Net amount to be accounted for ______________________ _                                                                              103, 899. 42
                                   _ _-_ _--
Gross amount expended_ _ _ ___ _ -_                     $105,390.21
Less reimbursements collected _-- _ _--       -            1, 490. 79
                                                                                                                                                     103, 899. 42
    1Exclusive        of available funds.
498             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

CONSOLIDATED            COST AND         FINANCIAL         SUMMARY             FOR MOREHEAD       CITY HARBOR,           N.   C.


Cost of new work to June 30, 1937 ___________________________                                                 $654, 751.68
Cost of maintenance to June 30, 1937 ______________________                                                    303, 361. 22
           Total cost of permanent work to June 30, 1937___ _____958, 112. 90

Net total expenditures--__--__________________                                                                   958,112. 90
Unexpeinded balance June 30, 1937___________________________                                                      12, 933. 21
           Total amount appropriated to June 30, 1937____________                                                971, 046. 11

    Fiscal year.ending June 30                 1933                1934             1935            1936              1937


Cost of new work ....--------             ----------------
                                                   __--- _-------...            _    __      -- $505, 432. 12        $48, 043. 74
Cost of maintenance-..__--.....             $20, 192. 01 ------.        __..         $55, 000 -----------                  66. 79
        Total cost_ -....-          --       20, 192. 01   --------------             55, 000     505, 432. 12        48, 110. 53
Total expended ..................            29, 947. 05 ------------                 55, 000     449, 576. 44       103, 966. 21
Allotted..----------------------12, 609. 68 -----.--..--.                             63, 000     555, 000. 00         3, 475. 86


Balance unexpended July 1, 1936 ------           -      -______-$113,
                                                                    423. 56
Amount allotted from War Department Appropriation Act ap-
proved Apr. 9, 1935------------------------------------------   5, 000. 00
     Amount to be accounted for-----------         ---- __--                                      ---      -118,      423.56
Deductions on account of revocation of allotment----1,                                                                524. 14

                                      ...........
      Net amount to be accounted for___--                                                    --        __    116, 899.42
Gross amount expended_-                                                                     1__-______-------
                                                                                           $105,457.00
Less reimbursements collected-___- __-------                                                    1, 490. 79
                                                                                                            103, 966. 21
      Balance unexpended June 30, 1937 .---                                                                        12, 933.21
                                                ____-
Outstanding liabilities June 30, 1937- -_____--$1,     011. 68
Amount covered by uncompleted contracts------------ 8, 517. 60
                                                                                                                   9, 529. 28

     Balance available June 30, 1937__              ____--____--___-                                                3, 403. 93
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------                                                          50, 000.00

Balance available for fiscal year 1938                                  ----           __-------53,                   403. 93
Amount (estimated) required to be appropriated for completion
of existing project 1----------------------------
                       _                                    -- 1, 000, 000.00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1............_     -               80, 000. 00
   1
       Exclusive of available funds.

           21. CAPE FEAR RIVER, N. C., AT AND BELOW WILMINGTON
  Location.-This river is formed by the confluence at Moncure,
N. C., in Chatham County, of the Deep and Haw Rivers. It flows in
a southeasterly direction and empties into the Atlantic Ocean at Cape
Fear. near the southern extremity of the State. (See U. S. Coast
and Geodetic Survey Charts Nos. 424 and 425.)
  Previous projects.-Authorized by River and Harbor Acts of
March 2, 1829; July 22, 1854; July 11, 1870; March 3, 1873; June 23,
1874; September 19, 1890; June 13, 1902; and March 2, 1907. The
cost and expenditures were $4,625,614.67 for new work and $602,-
614.25 for maintenance, a total of $5,228,228.92. (For further details
see p. 1804 of Annual Report for 1915.)
       RIVERS AND HARBORS-WILMINGTON,             N. C., DISTRICT    499
   Emisting project.-This provides for a channel across the bar 30
feet deep and 400 feet wide from Baldhead Point in a southwesterly
direction; thence 30 feet deep and 300 feet wide in the river up to
Wilmington, with increased width at bends; and for an anchorage
basin of the same depth at Wilmington 2,000 feet long, 900 feet wide
at the upper end, and 1,100 feet at the lower end, with approaches
1,500 feet long at both ends, and for a turning basin 30 feet deep at
Wilmington, 1,000 feet long, and 600 feet wide, with approaches 500
feet long at both ends, located opposite the principal terminals. The
plane of reference is mean low water. The length of the section
under improvement is about 30 miles, the upper limit being at Hilton
Bridge (Atlantic Coast Line and Seaboard Air Line Railroads) on
Northeast Cape Fear River, 114 miles above its mouth. The average
rise of the tide is 4.5 feet at the ocean bar, 3.5 feet at Keg Island, and
2.5 feet at Wilmington. The extreme range of tides is about 6.7 feet
at the ocean bar, 5.7 feet at Orton Cove, and 4.1 feet at Wilmington.
    The estimated cost for new work, revised in 1930, was $1,745,700,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $225,000
    The existing project was adopted by the following river and har-
bor acts: The act of July 25, 1912, provided for a channel 26 feet
deep (H. Doc. No. 287, 62d Cong., 2d sess.); act of March 2, 1919,
provided for a depth of 30 feet across the bar (H. Doc. No. 746,
65th Cong., 2d sess.) ; act of September 22, 1922, modified the project
to the extent of providing a new channel across the bar 30 feet deep
and 400 feet wide from Baldhead Point in a southwesterly direction
 (H. Doc. No. 94, 67th Cong., 1st sess.). No work has been done on
the 30-foot channel provided for by the act of March 2, 1919, and
the act of September 22, 1922, eliminates this modification. The act
of July 3, 1930, modified the 26-foot project to Wilmington by pro-
viding for 30 feet, with a turning basin opposite the principal ter-
minals (Rivers and Harbors Committee Doc. No. 39, 71st Cong., 2d
sess.). The latest published maps are in the Annual Report for 1914,
page 2018, and in House Document No. 615, Seventieth Congress,
second session.
    Terminal facilities.-There are 53 wharves of all classes at Wil-
mington, with a combined berthing space of 18,229 linear feet, and
depths of water alongside from 10 to 30 feet at mean low water.
It is believed that the terminals at Wilmington are adequate at the
present time for the commerce through this port.
    Below Wilmington there are 27 wharves, which are considered
adequate for present needs. For further details see Port Series No.
9. revised 1934, Corps of Engineers.
    Operations and results during fiscal year.-The work for the year
consisted of maintenance dredging with Government plant and hired
labor, and surveying. The U. S. hopper dredge Comstock, from
July 1 to August 31, 1936, removed 500,903 cubic yards of material
from the ocean bar channel and 27,171 cubic yards from Lower
Snows Marsh Channel, a total of 528,074 cubic yards. The U. S.
pipe-line dredge Henry Bacon, from July 1 to September 12, 1936,
and from June 22 to 30, 1937, removed 521,565 cubic yards of mate-
rial from the river channels and from the anchorage basin. The
U. S. pipe-line dredge Morgan, from June 11 to 22, 1937, removed
50,000 cubic yards from the anchlorage basin. The total material
500        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

removed by all dredges during the year was 1,099,639 cubic yards.
A complete hydrographic survey of the river between Wilmington
and Southport is being made. The cost of this survey for the year
was $12,541.70. As a result of the work the project dimensions were
practically available throughout the year. The cost of the work was
$113,384.05, all for maintenance. The expenditures were $113,421.25.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932. At the close of the fiscal year the mean low-water
depths were 28.8 feet in the ocean bar channel; 29 feet in the river
channels up to Wilmington; and 29 feet in the anchorage basin and
30 feet in the turning basin, at Wilmington. New Inlet and Swash
Defense Dams are in good condition. The total costs and expendi-
tures under the existing project to June 30, 1937, have been $2,033,-
982.47 for new work and $3,500,411.69 for maintenance, a total of
$5,534.394.16.
  Proposed operations.-The balance unexpended July 1, 1937, to-
gether with an allotment of $135,000 made during July 1937 ($170,-
000), will be applied as follows:
Maintenance:
   Dredging 600,000 cubic yards of material from the ocean bar chan-
      nel with the Government dredge Comstock, between Sept. 1, 1937,
      and Dec. 31, 1937----___----------------------_$_____40, 000
   Dredging 200,000 cubic yards of material from section III, the
      portion of the river between 9 and 22.6 miles below Wilmington,
      with the Government dredge Comstock, between Sept. 1, 1937,
        and Dec. 31, 1937--__        ______------------------------        --                20, 000
      Dredging 1,300,000 cubic yards of material from the river channels
        up to Wilmington and the anchorage and turning basins at Wil-
       mington with Government dredges, between July 1 and Sept. 30,
        1937, and during April, May, and June 1938 ___---------------
                                                      -                  100, 000
      Repairing New Inlet and Swash Defense Dams by placing 600 tons
       of rock and 400 cubic yards of concrete, by hired labor, during
      April and May 1938_--                                                                  10, 000

      Total for all work                                   _--------------------
                                                                             --             170, 000
  The additional sum of $225,000 can be profitably expended during
the fiscal year 1939 and will be applied as follows:
Maintenance :
   Dredging the ocean bar channel with the Government dredge Com-
      stock, between Nov. 1, 1938, and Mar. 31, 1939--------------      $60,000
   Dredging from section III (the portion of the river between 9 and
     22.6 miles below Wilmington), with the Government dredge Con-
      stock, between Nov. 1, 1938, and Mar. 31, 1939------------------_20, 000
   Dredging the river channels up to Wilmington and the anchorage
      and turning basins at Wilmington, with a Government dredge,
      between July 1 and Sept. 30, 1938, and Apr. 1 and June 30, 1939__ 135, 000
   Repairing New Inlet and Swash Defense Dams by hired labor,
      during April and May 1939-----------------------------------10,        000

        Total for all work ________________----_                                            225, 000
                                Cost and financial summary
Cost of new work to June 30, 1937----------------------------                        $6,659, 597. 14
Cost of maintenance to June 30, 1937____-_-____-----                                  4, 103, 025. 94

        Total cost of permanent work to June 30, 1937                  -----------   10, 762, 623. 08
            RIVERS AND HARBORS-WILMINGTON,                                               N. C., DISTRICT                   501

Net total expenditures ______________________--                                                               $10, 762, 623. 08
Unexpended balance June 30, 1937.-_____ ______---------------                                                       35, 000. 00
         Total amount appropriated to June 30, 1937------------                                               10, 797, 623. 08

   Fiscal year ending June 30                     1933             1934              1935              1936            1937


Cost of new work---------------$27,026.70---                            ---------------------------------------
Cost of maintenance ..------------              124, 066. 24     $102, 277.99  $151,113.53   $192,570.74   $113,384. 05

      Total cost----------------151, 092. 94                     102, 277. 99      151,113. 53    192, 570. 74        113, 384. 05

Total expended ......----------------       100, 013.87          169,535.86      -44, 632. 21     196,868. 79          113, 421. 25

Allotted---------.---                   -175,       480. 09      388, 971. 55    -667, 422. 48    200, 000. 00        -28. 500. 00



Balance unexpended July 1, 1936_---------------------------
                                _     _$176,                                                                           921.25
Deductions on account of revocation of allotment--_---------- ---                                                  28, 500. 00

      Net amount to be accounted for-------------------- -----                                                    148, 421. 25
Gross amount expended---------                   -----------------
                                    __--------------_                                                             113, 421.25

     Balance unexpended June 30, 1937-----------------------                                                       35, 000. 00
Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937_.._---------------------_                                                               135, 000. 00

         Balance available for fiscal year 1938 ___--------                                                       170, 000. 00

Amount that can be profitably expended in fiscal year ending
   June 30, 1939, for maintenance 1                            -------------------------                          225, 000. 00
   1Exclusive of available funds.

                22. CAPE FEAR RIVER ABOVE WILMINGTON, N. C.

  Location.-Forlocation of river see preceding report on Cape Fear
River, N. C., at and below Wilmington.
  Previous projects.-Adopted by acts of March 3, 1881, and June 13,
1902. The cost and expenditures were $149,119.19 for new work
and $8,177.67 for maintenance, a total of $157,296.86. For further
details see page 1805 of Annual Report for 1915.
  Existing project.-This provides for a navigable depth of 8 feet
at low water from Navassa to the head of navigation at Fayetteville,
115 miles above Wilmington, by the construction of three locks and
dams and by dredging of river shoals between Navassa and Fayette-
ville, and for a dredged channel from Wilmington to Navassa (4
miles), 25 feet deep and generally 200 feet wide, with a cut-off across
Horseshoe Bend and a turning basin approximately 550 feet long and
400 feet in average width at its head. Data regarding locks and
dams are as follows:

                                                                                Distance Distance Maximum
         Lock and dam                                 Location                  Wimingmothabove    dien-                  Lift
                                                                                   ton              sions

                                                                                 MAfiles     1Mliies        Feet          Feet
No.1...            _-------------------K ings Bluff-----------------                 39           69      200 by 40              11
No. 2 --------------------- Browns Landing......------------.                        71          101      200 by 40               9
No.3_.N ___------------.--.__          Tolars Landing------------                    95          125      300 by 40               9
502           REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY, 1937


                         AvailableC
                                on
                               depth ter of          Kind ofYear                                 of    Actual
     Lock and dam        mitersills founda-           dam        Type of construction     comple-         u
                          at low      tion                                                  tion
                          water


                            Feet
No. 1-----------               e 9     Sand .__      Fixed_._ Concrete lock timber crib     1916      1 $565,   856
                                                               dam rock filled.
No. 2_ -----------------        12         do____
                                            do ...    do.     Concrete lock, dam rock       1917      2 909, 633
                                                               filled.
No. 3-------------------          9   -.   do-----_.__do_.... Concrete lock, concrete
                                                               dam.
                                                                                            1935        660,930


  1Includes $96,184 for increasing lift.
  2Includes $356,443 for reconstruction and repairs.

   The tide ranges from 21/2 feet at Wilmington to 1 foot at .lock
no. 1, Kings Bluff, N. C., 39 miles above. The extreme range of
lunar tides is 4.1 feet at Wilmington and 1.5 feet at Kings Bluff.
The maximum variation due to floods ranges from 70 feet at Fayette-
ville to 5 feet at Wilmington.
   The estimate of cost for new work, revised in 1937, is $2,700,700,
exclusive of amount expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $43;600,
including $14,000 for operation and care of locks and dams.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910, which provided for the 8-foot channel and con-
struction of two locks and dams (H. Doc. No. 890, 60th Cong., 1st
sess.). Construction of lock and dam no. 3, and repairs and altera-
tions to locks and dams nos. 1 and 2 were authorized September 27,
1933, by the Public Works Administration and subsequently adopted
by the River and Harbor Act of August 30, 1935 (H. Doc. No. 786,
71st Cong., 3d sess.). The River and Harbor Act approved. June 3,
1930, provided for dredging a channel 22 feet deep to Navassa
 (Rivers and Harbors Committee Doc. No. 39, 71st Cong., 2d sess.),
and the River and Harbor Act approved August 26, 1937, provided
for a channel 25 feet deep and 200 feet wide from Wilmington to
N avassa, with a cut-off across Horseshoe Bend, and for a turning
basin (Rivers and Harbors Committee, Doc. No. 17, 75th Cong., 1st
sess.). (No work was done on the 22-foot channel to Navassa.)
Operation and care of locks and dams were included in the project
July 1, 1935, under provisions of the Permanent Appropriations Re-
peal Act approved June 26, 1934.
   (For latest published maps see H. Doc. No. 786, 71st Cong.:, 3d
sess., and Rivers and Harbors Committee Doc. No. 17, 75th Cong.,
1st sess.)
   Local cooperation.-The River and Harbor Act approved August
26, 1937, authorized a channel 25 feet deep and 200 feet wide to
Navassa, subject to the provision that local interests furnish, free
of cost to the United States, a right-of-way 600 feet wide for the
proposed cut-off across Horseshoe Bend and suitable spoil-disposal
areas for new work and for subsequent maintenance as required.
These conditions have not been complied with. All prior require-
ments have been fully complied with.
   Terminal facilities.-There are six wharves between Wilmington
and Fayetteville, including the public terminal at that point. They
        RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                    503

have a total frontage of about 700 feet. The terminals appear to be
adequate for existing commerce.
    Operations and results during fiscal year-Maintenance.-The op-
erations for the year with regular funds consisted of maintenance
snagging and dredging with Government and leased plant, operation
and maintenance of three locks and dams, gage readings, and sur-
veys. The U. S. derrickboat Contentnea cleared the channel of ob-
structions by snagging from a point 30 miles above Wilmington to
Fayetteville, at a cost of $8,218.63; in addition, the Contentnea
dredged 5,433 cubic yards of material from the channel at a cost
of $2,057.73. The leased dredge Virginia, from July 1 to 28, 1936,
removed 53,356 cubic yards from seven shoals between points 35
and 95 miles above Wilmington, at a cost of $7,704. The leased
dredge Reliance, from June 14 to 30, 1937, removed 17,664 cubic
yards from 3 shoals between points 69 and 95 miles above Wil-
mington, at a cost of $5,687.11. Stream gage readings were made in
cooperation with the United States Geological Survey at a cost of
$825A57. Miscellaneous surveys were made at a cost of $164.24.
    Operating and care.-The three locks and dams were operated
and maintained throughout the year at a total cost of $25,537.51, of
which $9,798.48 was for operation, $3,263.83 for maintenance and
repairs, :and $12,475.20 for improvements and reconstruction by lay-
ing 2,030 square yards of paving behind the land wall and placing
932.68 tons of riprap stone on the east bank at lock and dam no. 3.
   New work.-From Public Works funds, for improvement, land
at the site of lock no. 3 was purchased at a cost of $1,098.58. The
total cost of the work was $51,293.37, of which $50,194.79 was from
regular funds, all for maintenance, and $1,098.58 was from Public
Works funds, all for new work. The expenditures were $49,839.75,
of which $1,099.71 was from Public Works funds, and $48,740.04
was from regular funds.
   Condition at end of fiscal year.-The existing project, with the ex-
ception of the 25-foot project to Navassa, was completed in 1935.
The controlling low water depths are 19 feet to a point 9 miles above
Wilmington, thence 71/2 feet to lock no. 1, thence 5 feet to lock no. 2,
thence 8 feet to Fayetteville. The total costs under the existing
project to June 30, 1937, have been $2,594,653.81, of which $2,288,-
517.72, including $1,104,390.72 Public Works funds, was for new
work and $268,890.43 was for maintenance, and $37,245.66 for oper-
ating and care. The total expenditures were $2,589,842.52, of which
the sum of $1,485,451.80 was from regular funds and $1,104,390.72
from Public Works funds. In addition the sum of $175,825.56 was
expended between November 1, 1916, and June 30, 1935, on the oper-
ating and care of the works of improvement, under the provisions of
the permanent indefinite appropriation for such purposes.
   Proposed operations.-The balance unexpended July 1, 1937, $50,-
265.33, together with an allotment of $17,000 made during July 1937
 ($67,265.33), will be applied as follows:
Accounts payable June 30, 1937---------------------------------    $4, 906. 19
Maintenance:
    Dredging 87,000 cubic yards of material from the river channel
      at shoals between mile 60 and mile 95 above Wilmington, with
      leased plant, during July and August 1937 ....               23. 359. 14
504          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Maintenance--Continued.
    Snagging and dredging between Wilmington and Fayetteville,
      115 miles above Wilmington, with Government derrick boat
      Northeast, 4 months, September and October 1937, and Jon- $5, 000. 00
      uary and June 1938__                      _
      nary and June 1938---------------------------------- $5,000.00
Operating and care of locks and dams:
    Operating locks and dams nos. 1, 2, and 3, July 1, 1937,
      to June 30, 1938                                         , 500. 00
                                                             $8----------------------------
   Maintenance and repairs locks and dams nos. 1, 2,
      and 3, July 1, 1937, to June 30, 1938___________        3, 500. 00
    Constructing fender system, mooring dolphins and
      bumping blocks at locks and dams nos. 1, 2, and 3,
      under contract, between July 1 and Oct. 31, 1937__- 22, 000. 00
                                                                            34,000. 00
         Total for all work_______________________________                                                 ___ 67,265.33
  The additional sum of $108,600 can be profitably expended during
the fiscal year 1939, and will be applied as follows:
New work: Dredging 816,000 cubic yards of material from the pro-
posed 25-foot channel from Wilmington to Navassa, under contract,
between Sept. 1 and Dec. 31, 1938___-__________________________ $81, 600
Maintenance:
   Dredging the river channel between Wilmington and Fayetteville
      with Government plant and hired labor, during April 1939-...           10, 000
   Snagging and dredging between Wilmington and Fayetteville with
      the derrick boat Northeast, between July 1, 1938, and June 30,
      1939        --------------------------------------------------          5, 000
Operating and care of locks and dams:
   Operating locks and dams nos. 1, 2, and 3, July 1, 1938, to
      June 30, 1939---           --         --                       $8, 500
   Maintenance and repairs locks and dams nos. 1, 2, and 3,
      July 1, 1938, to June 30, 1939----------------------3,             500
                                                                             12, 000
            Total for all work                                                                                                600
                                                                                                                        1---------------------------
                                                                                                                        108,

                                             Cost and financial summary
                                    MAINTENANCE            AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937___________________________ $1, 333,246. 19
Cost of maintenance to June 30, 1937________-_____________-    1490, 139.32
      Total cost of permanent work to June 30, 1937----------1, 823, 385. 51
Undistributed costs June 30, 1937_________________
                                             -- --- __--              94. 90
     Net total cost to June 30, 1937________________________                                                 1, 823, 480. 41
Minus accounts payable June 30, 1937__-- __..   __________                                                        4,906. 19
     Net total expenditures--     ------------------------                                                   1, 818, 574. 22
Unexpended balance June 30, 1937____________________________                                                     50, 265. 33
         Total amount appropriated to June 30, 1937_____________                                             1, 868,839. 55

         Fiscal year ending June 30                          1933           1934          1935           1936               1937


Cost of new work --------------..
                  .-                                    ------------    --.------.     $56, 626. 55   $28, 418. 74   ------------
Cost of maintenance__
                   ----------                --------    $22, 714. 76    $9, 312. 67    17, 232.42     36, 369.30        $50, 194. 79
      Total cost   -----------------------                22, 714. 76     9, 312. 67    73, 858. 97    64, 788. 04         50, 194. 79
Total expended-___..----            --------..--_         12, 331. 62      -194. 36     68, 506. 93    66, 978. 50         48, 740. 04
                 -------------
Allotted--..........                         -   .        22, 778. 52      -971.82     129, 715.48     27, 000. 00         59, 000. 00

  1 Includes $175,825.56 from permanent indefinite appropriation.
                 RIVERS AND HARBORS-WILMINGTON,                                                            N. C., DISTRICT                             505


Balance unexpended July 1, 1936__ ___                                                                                                    $40, 005.37
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-                                                                                                                       59, 000. 00
      Amount to be accounted for -- __-___-------------                                                                   -                  99, 005. 37
Gross amount expended______--------------                                                                                                    48, 740. 04
      Balance unexpended June 30, 1.937--------------------                                                                                  50, 265.33
                                       --
Outstanding liabilities June 30, 1937____ _____-     $3, 693. 83
Amount covered by uncompleted contracts----------- 21,282. 43
                                                                                                                                             24, 976. 26
     Balance available June 30, 1937______________________                                                                                   25, 289. 07
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_________                                                                                                             17, 000. 00
     Balance available for fiscal year 1938 -----------------                                                                                42, 289. 07
Amount (estimated) required to be appropriated for completion
                                                                                                              -
    of existing project 2                                -         --------                                                                  81, 600. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939: 2 - -
                      -  - - - - -- - - - - - - - - --- - - - - - - - - - - - - - - - -
   For new work                                                                         --                                                   81, 600. 00
   For maintenance " - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - .                                                 27, 000. 00
         Total 2 - - - - - - - - - - - - - - - -                 - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - -
                                                                                                                                         108, 600. 00
    2 Exclusive of available funds.
                                                               PUBLIC          WORKS FUNDS

Cost of new work to June 30, 1937--------------------------                                                                       $1, 104, 390. 72
Cost of maintenance to June 30, 1937---------------------------
      Total cost of permanent work to June 30, 1937----------                                                                         1, 104, 390.72
Net total expenditures___-- __    -----------------                                                                                   1, 104, 390. 72
Total amount appropriated to June 30, 1937_--------------------                                                                       1, 104, 390. 72

     Fiscal year ending June 30                                1933                1934                1935                1936                     1937


                --------------------------
Cost of new work_.                                                              $173, 654. 54      $834, 232. 38         $95, 405. 22               $1, 098. 58
Cost of maintenance...---------------------------------------------                                                       --------------------
Total expended_------------- __--------------                                    124, 905. 15       786, 337. 00         192, 048. 86                1, 099. 71

Allotted-------------------...........................------------.........    1, 120, 000.00    ....-------------......... -15, 609. 28 -------------


Balance unexpended July 1, 1936_____         ___                                                                                             $1, 099.71
Gross amount expended_ ___.________      _________ $1, 100. 96
Less reimbursements collected--------------------------  1. 25
                                                                                                                                              1, 099. 71

CONSOLIDATED                  COST        AND       FINANCIAL                 SUMMARY        FOR CAPE             FEAR    RIVER,        N.    C.,     ABOVE
                                                                          WILMINGTON

Cost of new work to June 30, 1937----------------------------$2, 437, 636. 91
Cost of maintenance to June 30, 1937 __----___-        -__--___. 1490, 139. 32
      Total cost of permanent work to June 30, 1937_------                                                                            2, 927, 776. 23
Undistributed costs June 30, 1937_____________----     -9------                                                                          -     94. 90
        Net total cost to June 30, 1937-___-_______________ --          2, 927, 871. 13
   SIncludes $175,825.56 from the indefinite appropriation for operating and care of
canals, etc.
506            REPORT OF CHIEF                                OF ENGINEERS, U. S. ARMY, 1937
Minus accounts payable June 30, 1937__                                                                                        $4, 906. 19

         Net total expenditures _______________________2,                                                                    922, 964. 94
Unexpended balance June 30. 1937_--------------                                                                               50, 265. 33

         Total amount appropriated to June 30, 1937 -----                                             -----             2, 973, 230. 27

   Fiscal year ending June 30                            1933               1934           1935                 1936             1937


Cost of new work_ ........... __                ....             _     $173, 654. 54    $890, 858. 93       $123,823. 96         $1,098. 58
Cost of maintenance __------                -          $22, 714. 76       9, 312. 67      17, 232. 42         36, 369. 30        50, 194. 79
      Total cost--......--.....-----.....               22, 714. 76     182, 967. 21     908, 091.35          160, 193. 26       51, 293.37

Total expended-----------------                         12, 331. 62     124, 710. 79     854, 843. 93        259, 027.36         49, 839. 75
Allotted ___22,                                            778. 52    1, 119, 028. 18    129, 715. 48          11, 390. 72       59, 000. 00


Balance unexpended July 1, 1936_____-                                                                                        $41, 105. 08
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936 _____-                                                                                                   59, 000. 00
    :Amount to be accounted for_                                                                                             100, 105. 08
Gross amount expended__________________________                                                   $49, 841. 00
Less reimbursements collected----- __-____-____                                                    -     1. 25
                                                                                                                              49, 839. 75
      Balance unexpended June 30, 1937__________________                                                                      50, 265. 33
Outstanding liabilities June 30, 1937 _______________$3, 693.83
Amount covered by uncompleted contracts                                            -       --      21, 282. 43
                                                                                                                              24, 976. 26
     Balance available June 30, 1937_                                                                                         25, 289.07
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-                                                                                                      17, 000. 00
         Balance available for fiscal year 1938--------------                                               ___               42, 289. 07
Amount         (estimated)            required to be appropriated for comple-
                                                                   -
   tion of existing project                     2--          --         -     --                   ------                     81, 600. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939: -         -      - --
   For new work 2                     --                                                                                      81, 600.00
   For maintenance 2                                                                                                          27, 000. 00
                                                      -- --- -- -- -- --- -- -- --- -- --- -- -- --- -
          Total "                                                                                                            108, 600.00
  1 Includes $175,825.56 from the indefinite appropriation                                         for operating and care                of
canals, etc.
  2 Exclusive of available funds.



                        23. NORTHEAST (CAPE FEAR) RIVER, N. C.

   Location.--Rises in the northern part of Duplin County and flows
130 miles in a general southerly direction, emptying into the Cape
Fear River at Wilmington, 30 miles above its mouth.                                                                     (See U. S.
Coast and Geodetic Survey Chart No. 1235.)
   Existing project.-This provides for a channel 22 feet deep and
150 feet wide, increased at entrances and on curves, from Hilton
railway bridge to a point 23/4 miles above the mouth of the river, and
for clearing the natural channel for small steamers, thence to Halls-
ville and for pole boats to Kornegays Bridge. Total length of sec-
tion, 103 miles. The tide ranges from about 21/2 feet at the mouth
of this stream but decreases to nothing a short distance above Ban-
       RIVERS AND HARBORS-WILMINGTON,           N. C., DISTRICT    507

nermans Bridge. The upper portion is subject to freshets of from 8
to 12 feet. The extreme range of lunar tides is 4.1 feet at mouth, 2.5
feet at Castle Hayne, and 2 feet at Smiths Bridge. The maximum
                                                   at Kornegays Bridge,
variation due to floods is 5 feet at mouth, 8 feet at
and 13 feet at Bannermans Bridge.
   The estimate of cost for new work, revised in 1930, is $61,400, of
which local interests are to contribute $25,375. The latest (1919)
approved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the following river and harbor
acts: The act of September 19, 1890, provided for clearing the nat-
ural channel (H. Ex. Doc. No. 35, 51st Cong., 1st sess., and Annual
Report for 1890, p. 1181) ; and the act of March 2, 1919, provided for
the 22-foot channel (H. Doc. No. 1356, 62d Cong., 3d sess.). The
latest published map of the whole stream is in House Document No.
35, Fifty-first Congress, first session, and the latest map of the lower
23/ miles is in House Document No. 1356, Sixty-second Congress,
third session.
   Local cooperation.-The River and Harbor Act of March 2, 1919,
requires that local or other interests contribute one-half the cost of
the 22-foot channel authorized by the act of March 2, 1919, viz,
$25.375. Local interests have not yet contributed these funds.
   Te'rminal facilities.-The wharves on the portion of the river under
improvement by the United States number eight, all of which are
just above Hilton Bridge. They have a total frontage of about 1,140
feet. The water terminals are considered adequate.
   Operations and    results during fiscal year.-The work for the year
consisted of snagging with Government plant and hired labor. The
U. S. derrick boat Contentnea from April 28 to May 28 1937, cleared
the stream of obstructions between peoints 40 and 54 miles above the
mouth. As a result of this work a clear channel is available in this
portion of the stream. The cost and expenditures for the year were
$1,460, all for maintenance.
   Condition at end of fiscal year.-The clearing of the natural chan-
nel was completed in 1896. No work has been done on the 22-foot
channel. The entire project is about 22 percent completed. The
river is in fair condition to a point 48 miles above the mouth. The
governing low water depths are 15 feet to a point 23/4 miles above the
mouth; thence 6 feet to a point 48 miles above the mouth; and thence
3 feet to Crooms Bridge, 56 miles above the mouth. Above Crooms
Bridge the river is navigable during freshets only, which are liable
to occur any month in the year. The work remaining to be done to
complete the project is to dredge the channel 22 feet deep and 150
feet wide, increased at entrances and on curves, from Hilton railway
bridge to a point 23/, miles above the mouth of the river. The total
costs and expenditures under the existing project to June 30, 1937,
have been $10,687.96 for new work and $56,511.17 for maintenance,
a total of $67,199.13.
   Proposed operations.-The balance unexpended July 1, 1937,
$1,340, will be applied to maintenance snagging between the mouth
and a point 40 miles above, with the Government derrick boat Con-
tentnea, during July 1937.
   The additional sum of $3,000 can be profitably expended during
the fiscal year 1939, and will be applied to maintenance snagging
508                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

between the mouth and Crooms Bridge, with the derrick boat North-
east during April and May 1939.
                                                    Cost and financial summary

Cost of new work to June 30, 1937     -_____--______________   $10, 687. 96
Cost of maintenance to June 30, 1937-------------------------- 56, 511. 17

             Total cost of permanent work to June 30, 1937 __------__-67,                                                             199. 13
                                                                                                                                        1 "1
Net total expenditures---------------                                                   ----------------------                    67, 199. 13
Unexpended balance June 30, 1937____ --                                                ___     --
                                                                                              _________-____                       1, 340. 00
             Total amount appropriated to June 30, 1937--_______                                                     -__          68, 539. 13

            Fiscal year ending June 30                               1933                1934             1935         1936           1937

Cost of new work...................                        ...    ..........      ..     .
Cost of maintenance-------................                         $1, 209. 85         $2, 737.02    ------------...------------        $1,460
Total expended---............---...........----------------....     1,209.85            2,687.02           $50.00 ------------            1,460
Allotted        ..------      .-----------------------              1,   128.38         6, 273. 72     -1, 825. 17    -$2, 000            2,800


Amount             allotted from War Department Appropriation Act ap-
 'proved           Apr. 9, 1935--------------------------------------                                                               $920. 63
Amount             allotted from War Department Appropriation Act ap-
  proved           May 15, 1936                                                                                                     , 171. 01
                                                                                                                                   1----------------------------
Amount             allotted from War Department Appropriation Act ap-
  proved           Mar. 4, 1933_-----------------------------------------                                                            708. 36
      Amount to be accounted for- ___---- --.-    ______--                                                                         2, 800. 00
Gross amount expended-------------------------------------                                                                         1,460. 00
             Balance unexpended June 30, 1937_                                                                                     1, 340 00

Amount (estimated) required to be appropriated for completion of
                                                                               -
existing project 1 s                   _            _                                                                            25, 375. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                     -
                                                                                                                                   3, 000. 00
    1
      Exclusive of available funds.
     SIn addition, $25,375 to be contributed by local interests.

                                 24. SMITHS CREEK (WILMINGTON), N. C.

   Location.-Smiths Creek rises in New Hanover County and is a
tributary of Northeast (Cape Fear) River, which it enters from the
east just above Wilmington. (See U. S. Coast and Geodetic Survey
Chart No. 425.)
   Existing project.-This provides for a dredged channel at Wil-
mington, N. C., 12 feet deep at mean low water and 100 feet wide
through the bar at the mouth. The average rise of the tide is 21/2
feet. The estimate of cost for new work, made in 1931, was $11,000.
The latest (1931) approved estimate for annual cost of maintenance
is $500.
   This project was adopted by the River and Harbor Act of August
30, 1935 (S. Doc. No. 23, 72d Cong., 1st sess.). The latest published
map is contained in this document.
   Terminal facilities.-There are no terminal facilities and none are
needed for the handling of the present commerce.
               RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                                       509

   Operations and results during fiscal year.-The work for the year
consisted of dredging by contract. The contractor, from March 26
to April 21, 1937, removed 24,693 cubic yards of material from the
channel. As a result of this work the existing project has been com-
pleted. The cost and expenditures were $8,507.45 for new work
and $17.61 for maintenance, a total of $8,525.06.
   Condition at end of fiscal year.-The project was completed in
1937 at a saving of $2,475 under the estimated cost. At the close of
the year the limiting mean low-water depth was 11.5 feet. The total
costs and expenditures under the existing project to June 30, 1937,
have been $8,507.45 for new work and $17.61 for maintenance, a total
of $8,525.06.
  Proposed operations.-The balance unexpended July 1, 1937,
$1,474.94, will be applied to maintaining the channel by the removal
of 4,000 cubic yards of material with the Government dredge Henry
Bacon, during December 1937.
   No work is proposed during the fiscal year 1939, as it is believed
that no maintenance dredging will be required.
                                                 Cost and financial summary
Cost of new work to June 30, 1937------------------------------                                                               $8, 507. 45
Cost of maintenance to June 30, 1937-----------------------                                                                        17. 61

            Total cost of permanent work to June 30, 197--------------                                                         8, 525. 06

Net total expenditures ----------                                                                                              8, 525. 00
Unexpended balance June 30, 1937------------------------------                                                                 1, 474.94
            Total amount appropriated to June 30, 1937-----------------10, 000. 00

           Fiscal year ending June 30                         1933         1934            1935                 1936              1937


Cost of new work
Cost of maintenance
                                  -------------
                               .....--------------
                                                        ------ -------------         -----------------..........
                                                                                                   -------...... $8,507.45
                                                          -----------------  -----------     -------------------...........          17.61
        Total cost.......----------------..---------------------------------------------.........                                 8, 525. 06
Total expended............----------        -----.........------------..------------ ------------ ------------                    8, 525.06
Allotted.------...-----------------------------------10,                                                                            000. 00


Amount allotted from War Department Appropriation Act approved
May 15, 1936-----------------------------------------------   $10, 000. 00
Gross amount expended -------------                                       --------          ------                             8, 525. 06

            Balance unexpended June 30, 1937----------------                                                                   1, 474. 94
                                                     25. BLACK RIVER, N. C.

   Location.-This river rises in Sampson County, flows 175 miles in
a general southeasterly direction, and empties into Cape Fear River
14 miles above Wilmington and 44 miles above the mouth.
   Existing project.-This provides for clearing the natural channel
and banks to Clear Run, 66 miles, and cutting off sharp bends. The
tidal range is about 11/2 feet at the mouth and decreases to nothing
30 miles above. The low-water stages prevail usually from May
until August, inclusive; during the rest of the year the stage is about
510           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

5 to 8 feet higher; but the periods of high and low water are by no
means the same every year. The extreme range of lunar tide is 2.3
feet at the mouth and 1.2 feet at Point Caswell. The maximum
variation due to floods or freshets is 5 feet at the mouth, 15 feet at
Point Caswell, and 19 feet at Clear Run.
    The estimate of cost for new work, made in 1893, was $13,000.
The latest (1928) approved estimate for annual cost of maintenance
is $3,000.
    The existing project was adopted by the River and Harbor Act of
August 5, 1886 (Annual Report for 1885 , pp. 1145-1154, as amended
by Annual Report for 1893, p. 1407). No map of this stream has
ever been published.
    Terminal facilities.-No wharves exist on this river. Boats use
natural landings or prepare landings by smoothing out the roughness
and irregularities of the banks. No terminals are deemed necessary.
    Operations and results during fiscal year.-None.         =
    Condition at end of fiscal year.--The existing project was coIm-
pleted in 1895 at a saving of $642 under the estimated cost.. The
controlling low-water depths are 5 feet to Point Caswell, 24 miles
above the mouth; 21/ feet to Hawes Narrows, 32 miles above the
mouth, and 11/ feet to Clear Run, the head of navigation, and 66
miles above the mouth. The total costs and expenditures under the
existing project to June 30, 1937, have been $12,358.40 for new work
and $36,071.85 for maintenance, a total of $48,430.25.
    Proposed operations.-No funds were on hand July 1, 1937. An
allotment made during July 1937 ($2,000), will be applied to main-
tenance snagging between the mouth and Hawes Narrows, 32 miles
above, with the Government derrick boat Northeast, during.February
1938.
    The additional sum of $3,000 can be profitably expended during the
fiscal year 1939, and will be applied to maintenance snagging between
the mouth and Hawes Narrows with the derrick boat Northeast
during February and March 1939.
                                     Cost and financial summary
Cost of new work to June :30, 1937_                                                                          $12, 358.. 40
Cost of maintenance to June 30, 1937                   -----                 ---------                        36,071. 85

      Total cost of permanent work to June 30, 1937_.                                                           48, 430. 25
Net total expenditures-                                                               --        -               48, 430. 25
Total amount appropriated to June 30, 1937-      -                                   ---                        48, 430. 25

        Fiscal year ending June 30              1933               1934             1935              1936            1937


Cost of new work-.....-                         .-
                                                _      ---     $      -      ----   ----       ---      '-      -
Cost of maintenance                           $1, 548. 99      $1, 057. 06
Total expended--_                              1,548..--
                                                     99         1, 012. 10           $44. 96    -

Allotted.     _____________________________    1, 184. 37       4,547. 37      -1. 490. 31           -$2, 000


Anmount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937__ _              ___-_-_ __ ______      _-_$2. 000. 00
Palance available for fiscal year :1938     ___ _                   2.-_000. C00
Amount that can be profitaly expended in fiscal year ending June
   3 0. 1939, for maintenance                                      _ __ __                              __          3,000. 00
   1Exclusive    of available funlds.
           RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                                                    511
   26. EXAMINATIONS,                          SURVEYS,                    AND CONTINGENCIES                                (GENERAL)

  The cost of work during the year amounted to $43,594.52; the
expenditures were $43,251.24. The balance unexpended July 1, 1937,
together with an allotment made during July 1937 ($20,731.82), will
be applied as needed during the fiscal year 1938, to payment of
expenses incurred under this heading. The additional sum of
$25,000 can be profitably expended during the fiscal year ending
June 30, 1939.
                                               Cost and financial summary
Cost of new work to June 30, 1937_-------------------------------
Cost of maintenance to June 30, 1937__________---------------                                                                      $130, 890. 61

      Total cost of permanent work to June 30, 1937-------------- 130, 890. 61
Minus accounts payable June 30, 1937-----------                        730.22

     Net total expenditures----------                                                              --------------                   130, 160. 39
Unexpended balance June 30, 1937------ __--                                                        ______------------                    731. 82

         Total amount appropriated to June 30, 1937--                                                    ______-----               130, 892. 21

         Fiscal year ending June 30                                   1933               1934           1935              1936            1937


Cost of newwork,     ...------------------------------
                               -----------------------------------
Cost of maintenance..----------------
                           ..     .   -- $9, 667. 53                                $10, 911. 39     $21, 396.19      $21, 620. 98      $43, 594. 52
Total expended......------------------------                         9, 667. 53      10, 904. 62      20,620.06        22, 016. 94       43, 251. 24

Allotted......------------------------------                         9,667. 53       24, 506. 40      25, 018. 28      25, 000. 00       23,000. 00


Balance unexpended July 1, 1936_                                                                                                    $20, 983. 06
Amount allotted from War Department                                                  Appropriation             Act ap-
   proved May 15, 1936----------------------------------------                                                                       23, 000. 00

      Amount to be accounted for __________________________                                                                          43, 983. 06
Gross amount expended---------------------------- $43, 350.08
Less reimbursements collected_---------------            98.84
                                                                                                                                     43, 251.24
      Balance unexpended June 30, 1937________________    --   __--731.         82
Outstanding liabilities June 30, 1937__-____________________ -   __         731.82
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937-____---------------------------------         20,000.00
Balance available for fiscal year 1938_________________________         20, 000.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                       25, 000. 00
   1 Exclusive of available funds.

27. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                    [Commercial statisties forthese projects are given in pt. 2 of report]

                                                                             For last           Cost and expenditures
                                                                             full re-              to June 30, 1937                   Estimated
                   Name of project                                           port see                                                amount re-
                                                                              nnual of project
                                                                             AName                                                    quired to
                                                                             Report-   New work                     Mkinte-           complete
                                                                              for-                                  nance

1. South River, N. C.1___-------------------------                                1936        $12,452. 02           $21,469.88       Completed.
2. Shallotte River, N. C. ..............
                           _                   ._
                                          _......                                 1933         18,181.37              6, 467. 81        Do.
3. Harbor of Refuge at Cape Lookout, N. C. ....                                   1934      1,368, 798. 72           32, 853. 75       $1, i60, 000

1Channels adequate for commerce.
      20196-37-pt. 1--- 33
512             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

          28. PLANT ALLOTMENT FOR WILMINGTON, N. C., DISTRICT

                                           Cost and financial summary

Undistributed costs June 30, 1937 ---  --       --------------- $588, 010.00
Plus accounts receivable June 30, 1937------------------------- 42, 452. 70

      Gross total costs to June 30, 1937-----------------------                                                                  630, 462. 70
Minus accounts payable June 30, 1937-------------------------26,                                                                      742. 74

     Net total expenditures--------------------------------                                                                      603, 719. 96
Unexpended balance June 30, 1937--------_______                                                                                   50, 842. 51
          Total amount appropriated to June 30, 1937---------------654,                                                                  562. 47

    Fiscal year ending June 30                  1933                    1934              1935                       1936            '1937

Cost of new work------------
                  ...                 ..............              ----------
Cost of maintenance     .............--------------    ----.---                ..   .                       -
                                                                                           -.........---------                     ...

Total expended........              -------------             -----------           $797, 285. 07 -$107, 478. 02                   -$86, 087.09
Allotted...-------       _-     ----- -.        -        .-                             977, 640. 98             -156, 606. 41     -166, 472.10


Balance unexpended July 1, 1936--------------    -----------------   $131, 227. 52
Amount allotted from War Department Appropriation Act ap-
  proved April 26, 1934------------------------------    $62, 000.00
Amount allotted from War Department Appropriation
  Act approved May 15, 1936-----.---------------- 548, 693. 11
                                                                      610, 693.11
      Amount to be accounted for .7--------------------------    41,920. 63
Deductions on account of revocation of allotment--------------. 777, 165.21
       Net amount to be accounted for-----------------------                 -35,244. 5
Gross amount expended---------------------                   $1, 307,049. 43
Less : Reimbursements collected .------- $630, 065. 55
Receipts from sales-----------------       763, 070. 97
                                                              1, 393,136. 52
                                                                             -86, 087. 09

      Balance unexpended June 30, 1937----------------------                                                                      50,842. 51
Outstanding liabilities June 30, 1937---------------$54, 410.92
Amount covered by uncompleted contracts-----------61, 035. 55
                                                                                                                                 115, 446. 47
     Balance available June 30, 1937--------------------    ---                                                                  64, 603. 96
Accounts receivable June 30, 1937 ----------------------------                                                                   42,452 70

Unobligated balance available June 30, 1937-------------                                                           ----- -22,151.            26

                              29. TAR RIVER, N. C., FLOOD CONTROL

  Location.-The work covered by this project is on that portion of
Tar River which lies between Tarboro and Rocky Mount, 49 and 89
miles above Washington, N. C., respectively.
  Existing project.-This provides for clearing the natural channel
between Tarboro and Rocky Mount of obstructions for the purpose
of reducing flood heights, at an estimated cost of $90,000, and was
authorized in the Flood Control Act approved June 22, 1936.
  Local cooperation.--See page 6.
    Operation and results during fiscal year.-None.
    Condition at end of fiscal year.--Work has not been started.
           RIVERS AND HARBORS-WILMINGTON, N. C., DISTRICT                                                                        513

Proposed operations.--An allotment of $90,000 made during
August 1937 will be applied to completion of the project.
Status of reports called for by river and harbor acts and committee resolutions

                                                       Date trans-                                                      Recommenda-
        Locality               Authorization act       mitted to                    Document no.                            tion
                                                        Congress

Back Sound, N. C., to         River and Harbor Act    May 17, 1937          House, 251, 75th Cong.,                     Favorable.
  Lookout Bight, chan-         Aug. 30, 1935.                                1st sess.
nel.
Beaufort, N. C., to Cape      Rivers and Harbors      Feb. 15,1937          Rivers and Harbors                             Do.
  Fear River, inland           Committee resolu-                              Committee, 16, 75th
waterway, including           tion, Apr. 17, 1936.                           Cong., 1st sess.
waterway to Jackson-
ville, N. C., in vicinity
  of Swansboro, N. C.
Beaufort, N. C., to Cape      Rivers and Harbors      June 9,1937 I--------------------..................I              Unfavorable.
  Fear River, inland           Committee resolu-
waterway, including           tion, Oct. 17, 1936.
  waterway to Jackson-
  ville, N. C., in vicinity
  of Factory Landing,
near Hampstead, N.C.
Belhaven Harbor, N. C.    Rivers and Harbors          June 8,1937                                                          Do.
                            Committee resolu-
                            tion, Jan. 16, 1935.
    D o---------------- . Rivers and Harbors
                            Committee resolu-
                            tion, June 24, 1937.
    Do........... ... _ River and Harbor
                            Act, Aug. 26, 1937.
Cape Fear River, N. C., Rivers and Harbors
at and below Wilming-      Committee resolu-
ton.                       tion, Jan. 27, 1937.
Cape Fear River, N. C., ---- do -- -------------.
to St. Johns River,
Fla., intracoastalwa-
terway (yacht basin
at Southport, N. C.).
Cape Fear River, N. C., Rivers and Harbors             Feb. 15,1937         Rivers and Harbors                          Favorable.
between Wilmington         Committee resolu-                                 Committee, 17, 75th
and Navassa.               tion, Jan. 24, 1936.                              Cong., 1st sess.
Contentnea Creek, N.C., River and Harbor                                   ........................
from Wilson to its con-    Act, Aug. 26, 1937.
fluence with Neuse
River.
Dolls Creek, N. C-......  River and Harbor Act,                            ......... ..............
                            Aug. 26, 1937.
Drum Inlet, N. C., near River and Harbor Act,
  town of Atlantic.         Aug. 30, 1935.
Morehead City Harbor Senate            Committee      Sept. 13, 1935        Senate      Committee                       Favorable.
and Beaufort Inlet,        resolution, Aug. 7,                               print, 75th Cong.,
  N. C.                     1935.                                             1st sess.
Neuse River, N. C., River and Harbor Act,
  between Johnson           Aug. 26, 1937.
  County line and New
  Bern, navigation and
  flood control.
New River Inlet, N.     C_-
                          Rivers and Harbors
                            Committee resolu-
                                                                           ---....................

                            tion, June 18, 1937.
New River and New Rivers and Harbors                  Nov. 17, 1936                                                     Unfavorable.
  River Inlet, N. C.        Committee resolu-
                            tion, Apr. 16, 1935.                           . . . . . . . . . . .. . . . . ---
Pamlico Sound, N. C., Rivers and Harbors              ...............-
  to Stumpy Point,          Committee resolu-
  channel.                  tion, Jan. 27, 1937.                           ....................       -   -   --   --




Pamlico Sound to Beau- Rivers and Harbors             ...............-
  fort Harbor, N. C.,       Committee resolu-
  waterway.                 tion, May 5, 1937.
Pamlico Sound to Ro- River and Harbor Act,
  danthe, N. C., via        Aug. 26, 1937.
  Pugh's Channel.
Rollinson Channel, N. River and Harbor Act,                 . ..
  C., channel from, to      Aug. 26, 1937.
  wharves at Hatteras,
  N. C.
Tar River, N. C., be- Rivers and Harbors               Mar. 24, 1937        Rivers and Harbors Favorable.
  tween      Washington     Committee resolu-                                 Committee, 22, 75th
  and Greenville.           tion, Feb. 27, 1934.                              Cong., 1st seass.
Vandermere Harbor and River and Harbor Act,            Mar. 26, 1937        House, 185, 75th Cong., Do.
  Bay River at Bayboro, Aug. 30, 1935.                                        1st sess.
  N. C.
514      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

-IMPROVEMENT OF RIVERS AND HARBORS                               IN   THE
          CHARLESTON, S. C., DISTRICT
   This district includes the watersheds of all rivers flowing into the
ocean on the coast of South Carolina northeast of Port Royal Sound.
It embraces the central portion of North Carolina and all of South
Carolina except Beaufort, Broad, and Savannah River Basins, in-
cluding the portion of the intracoastal waterway from Cape Fear
River, N. C., to Winyah Bay, S. C., south of Little River, S. C., and
from Winyah Bay to Charleston and from Charleston to'Beaufrt,
S. C.
   District engineer: Capt. Fred T. Bass, Corps of Engineers.
   Division engineer: Col. Earl I. Brown, Corps of Engineers.
                              IMPROVEMENTS

                                  Page                                    Page
1. Intracoastal waterway, Cape         8. Charleston Harbor, S. C     .   528
     Fear River, N. C., to Win-        9. Ashley River, S. C---------     532
     yah Bay, S. C--              491 10. Shipyard River, S. C       _    534
2. Winyah Bay, S. C----------     514 11. Waterway from Charleston
3. Waccoamaw River, N.. C. and,             to Beaufort, S. C.....        536
     S. C--------------------.    517 12. Examinations, surveys, and
4. Great Peedee River, S. C. -_   519       contingencies (general)__-    539
5. Waterway from Winyah Bay           13. Other projects for which no
     to Charleston, S. C--        521       estimates are submitted-.-    540
6. Santee River, S. C___          524 14. Plant allotment-_ -----         540
7. Congaree River, S. C-------    525

1. INTRACOASTAL WATERWAY FROM CAPE FEAR RIVER, N. C., TO
     WINYAH BAY, S. C.-SECTION SOUTH OF LITTLE RIVER, S. C.

   (For report on this improvement see p. 491.)
                          2. WINYAH BAY, S. C.

   Location.-This bay lies on the coast of South Carolina, 50 miles
northeast of Charleston Harbor and 90 miles southwest of the en-
trance to Cape Fear River, N. C. (See U. S. Coast and Geodetic
Survey Chart No. 428.)
   Previous projeets.-Adopted:by River and Harbor Acts of August
2, 1882, and August 5, 1886. Total cost and expenditures were
$2,560,408.22, of which $2,445,851.85 was for new work and $114,-
556.37 was for maintenance. For further details see page 1806 of
Annual Report for 1915.
   Existing project.-This provides for a channel 400 feet wide and
18 feet deep at mean low water from the entrance of Winyah Bay,
following the western shore as far as may be necessary, to a point on
the Sampit River 1 mile above the limits of the city of Georgetown,
to be secured and maintained (a) by the construction of two jetties
springing, respectively, from North and South Islands and converg-
ing to give an opening 4,800 feet wide at the 18-foot curve on the
seaward side of the bar, the jetties to be of stone on brush mattresses,
       RIVERS AND HARBORS-CHARLESTON,           S. C., DISTRICT    515
the north jetty having a length of 11,139 feet and the south jetty
21,051 feet; (b) by dredging across the bar to the 18-foot curve indi-
cated; (c) by construction of an earthen dike 14,300 feet long to pro-
tect the shore line of South Island at the southerly side of the bay;
  (d) by dredging in the bay proper, following the southwestern shore
for a distance of about 6 miles opposite Mud Bay; (e) by dredging
a channel between Eastern and Western Channels and between
Frazier's Point and Mosquito Point; and (f) by dredging in Sampit
River opposite the city of Georgetown and across the bar at the
mouth of the river. The mean range of tide at Georgetown is 3.3
feet, while the spring tides have a mean rise and fall of 4 feet.
    The estimate of cost for new work, revised in 1935, was $817,000,
exclusive of amounts expended on previous projects. The latest
  (1928) approved estimate for annual cost of maintenance is $46;000.
    The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for the jetties (H.
Ex. Doc. No. 258, 48th Cong., 2d sess., reprinted on pp. 1154-70
of the Annual Report for 1885, and H. Ex. Doc. No. 117, 50th Cong.,
2d sess., reprinted on pp. 1110-15 of the Annual Report for 1889).
Under this same act the earthen dike was provided as a measure for
protection for the south jetty; act of June 25, 1910, provided for
the present channel dimensions and the training wall (H. Doc. No.
398, 58th Cong., 2d sess., reprinted on pp. 1591-1609 of the Annual
Report for 1904). For the latest published: map see Annual Report
for 1915, page 2394.
    Terminal facilities.-The terminal facilities at the port of George-
town served by this improvement consists of seven wharves of ordi-
nary timber construction, suitable for ocean-going vessels, and a
number of smaller wharves and landing places. They are considered
adequate for the present commerce of the port.
    Operations and results during fiscal year.-The new direct channel
between Frazier Point and Mosquito Point was provided by the
removal, under contract, of 6,846,972 cubic yards of material.
    The U. S. dredge Colonel G. P. Howell removed 163,912 cubic
yards of material in restoring project dimensions across Sampit
River bar.
    The costs during the year were $367,016.57 for dredging under
contract, chargeable to new work; $11,884.28 for dredging Sampit
River bar with Government plant and hired labor and $1,841.76 for
surveys and supervision, a total of $13,726.04, chargeable to main-
tenance. The total costs during the year were $380,742.61. The
expenditures were $379,403.99.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1937 with the completion of the new direct channel from
Frazier Point to Mosquito Point. The jetties were completed in
1903-4. The crest elevations vary from 3 to 5 feet below their orig-
inal heights. Dikes of various forms have been built to protect the
South Island beach and the shore end of the south jetty. The Sam-
pit River entrance is protected on the eastern side by a timber and
brush training wall 2,000 feet long.
516            REPORT OF CHIEF OF ENGINEERS, U. S.e ARMY, 1937

   A survey made in May 1937 showed that project dimensions ob-
tain, except in the Sampit River entrance channel, where the con-
trolling depth is 16.5 feet for a width of 200 feet, and in Sampit.
River, where there is a controlling width of 150 feet at project depth.
   The total costs to date amount to $858,217.30 for new work and
$994,482.46 for maintenance, a total of $1,852,699.76. The total ex-
penditures were $1,852,730.75.
   Proposed operations.-The balance unexpended July 1, 1937 ($5,-
675.64), less $5,000 revoked on July 1, 1937, together with $49,000
allotted in July, and $25,000 to be allotted, a total of $74,675.64, will
be applied as follows:
Accounts payable, July 1, 1937__--__--                  ________-____ __________   $228. 86
Maintenance :
   Dredging to restore project dimensions in the entrance channel
      to Winyah Bay and in the Eastern Channel, with a United
      States hopper dredge and hired labor, Dec. 1, 1937, to Feb.
      28, 1938--------------------------------------------                       51, 000. 00
   Dredging to restore project dimensions at and near the mouth
      of Sampit River, with U. S. pipe-line dredge Colonel G. P.
      Howell, July-September 1937-----                            __-----_--------
                                                                           __-   20, 000.00
    Supervision of the project, including surveys of the Winyah Bay
      entrance channel at the jetties, Eastern Channel, and Sampit
      River Channel, July 1, 1937, to June 30, ,1938 .----------------            3, 446. 78

             Total for all work---------------------------------74,                                            675. 64
  The additional sum of $75,000 can be profitably expended during
the fiscal year ending June 30, 1939, in dredging to restore project
dimensions as may be found necessary in Eastern Channel and
Sampit Bar Channel, with hopper dredge and the U. S. pipe-line
dredge Colonel G. P. Howell and hired labor.
                                          Cost and financial summary

Cost of new work to June 30, 1937---    --------------------- $3, 304,069. 15
Cost of maintenance to June 30, 1937_____________________      1,109, 038.83

      Total cost of permanent work to June 30, 1937----------                                        4, 413, 107. 98
Undistributed costs June 30, 1937  __------. ----------- __-__259.                                                85

     Net total cost to June 30, 1937----__________________    4,413, 367. 83
Minus accounts payable June 30, 1937 ------------------------        228. 86

     Net total expenditures ------      -----------------                                            4, 413, 138.97
Unexpended balance June 30, 1937___-------------------------                                              5, 675.64
           Total amount appropriated to June 30, 1937-----------                                     4, 418, 814. 61

           Fiscal year ending June 30                  1933          1934           1935         1936           1937
Cost of new work_....                                                                       ._$367, 016.57
Cost of new work-------,,,,             ---     ,-------------------------------------------- $367,016.57
Cost of maintenance--------_........_    _...   .. $48, 023. 18   $38, 861. 70   $16, 433.42    $5,871.01      13, 726. 04

                                         48, 023. 18 38, 861. 70
       Total cost..........-------............----------..                        16, 433. 42   5, 871.01     380, 742. 61

                          ------- 43, 228. 44 22, 573. 38 17, 859. 66 14, 264. 68 379, 403.99
Total expended....---------------

Allotted    ----------........................---............
                             --   83, 047. 24  4,758.36   20, 000. 00 325, 000. 00 50, 000.00


                                   -
Balance unexpended July 1, 1936 ..----                               -335,                                     079. 63
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936--   -    -    -   __-_- - _      --                                                    50, 000. 00
           Amount to be accounted for--_ --                                                             385,079. 63
         RIVERS AND HARBORS-CHARLESTON, S                     C., DISTRICT         517
Gross amount expended-- -------------------        $381, 352. 72
Less reimbursements collected_ -------------------- 1, 948. 73
                                                                            $379,403.99

      Balance unexpended June 30, 1937----------------------                   5, 675. 64
Outstanding liabilities June 30, 1937---------------------------                  228. 86

     Balance available June 30, 1937-----------------------                   5, 446. 78
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 ----------------------------------                   49, 000.00

      Balance available for fiscal year 1938-------------------             154, 446. 78

Amount that can be profitably expended       in fiscal year ending
                                 - - - - -- ---------- ----- - - - -- - -
June 30, 1939, for maintenance 2                                            75, 000. 00
1 Includes $5,000 revoked July 1, 1937.
  2 Exclusive of available funds.

                    3. WACCAMAW RIVER, N. C. AND S. C.

   Location.-This river rises at Lake Waccamaw, N. C., and flows
southwest 142 miles into Winyah Bay, near Georgetown, S. C. (See
U. S. Coast and Geodetic Survey Chart No. 152.)
   Existing project.-This provides for a channel 12 feet deep at low
water, with 80 feet bottom width, from the mouth of the river to
Conway, nearly 44 miles; thence a channel 4 feet deep at low water
and 50 feet wide to Red Bluff, 26 miles above Conway; thence a
cleared channel to Lake Waccamaw. The usual seasonal variation in
water surface is about 7.5 feet at Conway and about 12 feet at Star
Bluff, 80 miles above the mouth. The tidal variation in Winyah Bay
is 3.3 feet and at Conway at low river stage it is 1.6 feet.
   The estimate of cost for new work, revised in 1930, was $262,800.
The latest (1930) approved estimate for annual cost of maintenance
is $4,500.
   The existing project was adopted by the following river and har-
bor acts: The act of June 14, 1880, provided for the 12-foot channel
with 80 feet bottom width to Conway and a cleared channel from
Conway to Lake Waccamaw (S. Ex. Doc. No. 117, 46th Cong., 2d
sess., and Annual Report for 1880, p. 848); and the act of July 3,
1930, provided for the channel 4 feet deep at low water and 50 feet
wide from Conway to Red Bluff (H. Doc. No. 82, 70th Cong., 1st
sess.). For map of the river see House Document No. 514, Fifty-
eighth Congress, second session, and the last-mentioned document.
  Recommended modifications of project.-Recommendation has been
made to Congress that the project be curtailed by eliminating all
work between Star Bluff and Lake Waccamaw (H. Doc. No. 467,
69th Cong., 1st sess.).
   Terminal facilities.-At Toddville and at Conway there are
wharves and warehouses, which are free and open to all carriers. At
intermediate landings there are privately owned free wharves. The
terminals are considered adequate for the existing commerce.
   Operations and results during fiscal year.-The U. S. dredge
Colonel G. P. Ho well restored project dimensions between Conway
and Bucksport, removing at six shoals a total of 111,829 cubic yards
of material. The U. S. snagboat Wateree and U. S. derrick barge
No. 4 removed a total of 29 obstructions from the channel at miles
44.0, 60.5, and 61.3.
518                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The costs during the year were $11,316.94 for dredging and $441.54
for snagging, a total of $11,758.48, all by Government plant and hired
labor and all chargeable to maintenance.
   The total expenditures were $11,962.21.
   Condition at' end of fiscal year.- The 12-foot project channel to
Conway was completed in 1924 and obtains for most of the distance.
Shoals, however, have formed at several places, and the controlling
depth at these points is 11.3 feet for a controlling width of about 40
feet. In the 4-foot channel from Conway to Red Bluff the channel
has project dimensions to Sessions Landing, mile 56.5; from Sessions
Landing to Red Bluff sand bars have formed limiting the controlling
depth to 2.8 feet at low water for a width of 30 feet. Above Red
Bluff (mile 69), no work having been done for several years, the
channel is obstructed by logs and snags and cannot be navigated
safely.
   The costs to date amount to $262,813.58 for new work and $139,-
123.45 for maintenance, a total of $401,937.03.
   The total expenditures to date amount to $401,752.83.
   Proposed operations.-The balance unexpended July 1, 1937
 ($974.04), together with $4,500 allotted during July 1937, will be
applied as follows:
Accounts payable July 1, 1937---------------------------------        $184. 20
Maintenance: Snagging between Enterprise, mile 29, and Red :Bluff,
  mile 69, with the U. S. snagboat TVaterce and hired labor, Oct. 13
  to Nov. 25, 1937    ------------------------------------------     5, 289. 84

             Total for all work ----                               ---------------------------------                                      5, 474. 04
   The additional sum of $4,500 can be profitably expended during the
fiscal year ending June 30, 1939, in maintenance snagging as may be
found necessary between Enterprise, mile 29, and Red Bluff, mile 69,
with the U. S. snagboat WVateree and hired labor.
                                                     Cost and financial summary
Cost of new work to June 30, 1937-..------------------------- $262, 813. 58
Cost of maintenance to June 30, 1937-------------------------   39, 123. 45
      Total cost of permanent work to June 30, 1937------------ 401, 937. 03
Minus accounts payable June 30, 1937---------------------------      184. 20
Net total expenditures -------------------------------------                                                                        401, 752. 83
Unexpended balance June 30, 1937-------- ---------------------                                                                           974. 04
             Total amount appropriated to June 30, 1937---------------402, 726. 87

             Fiscal year ending June 30                                  1933             1934              1935             1936            1937

Cost of new work_ ..-----------                                    ..       .-.......                 .         -......      .
Cost of maintenance.__.-------------------$5,                             469. 58       $6, 183.94        $4, 796.39      $10,442. 58      $11,758.48
Total expended.........................-----------------------..        5, 469. 58       6, 363.01         4, 348. 88      10, 309. 15      11, 962. 21
Allotted-----------------...................................        11, 942. 74         13, 484. 13        4,500.00         4,500.00         65,000.00

Balance unexpended July 1, 1936-----------------------       -                                                                           $7, 936. 25
Amount allotted from War Department Appropriation Act approved
    May 15, 1936 ...------------------                                                                                                    5, 000. 00
             Amount to be accounted for-.....                                             -----              --- ------                  12, 936. 25
        RIVERS AND HARBORS-CHARLESTON, S. C., DISTRICT                       519
Gross amount expended-----------------------------     $11, 976.15
Less reimbursements collected-----.-------------------       13. 94
                                                                      $11, 962. 21

      Balance unexpended June 30, 1937-------------------------           974. 04
Outstanding liabilities June 30, 1937-----------------------------        184. 20

     Balance available June 30, 1937----------------------------          789. 84
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------------         4, 500. 00

      Balance available for fiscal year 1938--------------------        5, 289.84

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1------------------------------------        4, 500. 00
1 Exclusive of available funds.

                         4. GREAT PEEDEE RIVER, S. C.

   Location.-Great Peedee (Pee Dee) River rises in the mountains of
North Carolina and flows generally southeast for 435 miles into
Winyah Bay, near Georgetown, S. C. Above the Uharie River, 233
miles from the mouth, it is called the Yadkin. (See U. S. Geological
Survey map of South Carolina, 1913.)
   Existing project.-This provides for a cleared 9-foot channel
between Waccamaw River and Smiths Mills and thence a 31/2 -foot
channel to Cheraw at all stages of water. The tidal variation at
low-water stage is 3.3 feet at the mouth and 3 inches 34 miles above.
The ordinary flood stage is 18 feet above the low-water stage at
Smiths Mills, 17 feet at Atlantic Coast Line Railroad bridge, and
27 feet at Cheraw Bridge, respectively 52, 103, and 167 miles from
the mouth.
   The estimated cost for new work, revised in 1900, was $235,345.
The latest (1900) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the removal of
all obstructions so as to secure a navigable depth of 9 feet to Smiths
Mills and 31/2 feet to Cheraw (S. Ex. Doc. No. 117, 46th Cong., 2d
sess., and Annual Report for 1880, p. 844) ; the act of June 13, 1902,
provided for securing a 31/2 -foot channel between Cheraw and the
Atlantic Coast Line Railroad bridge by means of dredging, snag-
ging, and the construction of timber and pile dams (H. Doc. No. 124,
56th Cong., 2d sess.). For map see Annual Report for 1889, page
1180.
   Recommended modifications of project.-Recommendation has
been made to Congress that the project be curtailed by elimination
of all work between Jeffreys Creek and Cheraw. (H. Doec. No. 467,
69th Cong., 1st sess.)
   Terminal facilities.-There are practically no terminal facilities,
except small sheds constructed at a few landings as a protection to
freight. They are privately owned.
   Operations and results during fiscal year.-The U. S. snagboat
Wateree removed 712 snags, stumps, logs, and overhanging trees in
clearing the channel between mile 36.0 and mile 58.5. The total costs
during the year were $2,528.97 for removing obstructions, all charge-
able to maintenance. The total expenditures were $611.95.
520         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Condition at end of fiscal year.-The existing project was com-
pleted in 1909 at a saving of $51,633 under the estimated cost. There
exists from the Waccamaw River via Bull Creek to mile 52 a cleared
channel 9 feet deep at lowest recorded stage. It is navigable to boats
drawing 31/2 feet at all stages of water to Jeffreys Creek (mile 89).
Above Jeffreys Creek the river cannot be safely navigated because of
many snags and sunken logs.
  The total costs to date amount to $183,712.41 for new work and
$194,626.16 for maintenance, a total of $378,338.57. The total expen-
ditures were $376,256.62.
  Proposed operations.-The balance unexpended, July 1, 1937
($4,928.85), together with $5,000 allotted during July 1937, will be
applied as follows:
Accounts payable, July 1, 1937------------------------------       $2, 081.95
Maintenance: Snagging from Smiths Mills, mile 52, to Jeffreys
  Creek, mile 89, with the U. S. snagboat Wateree and hired labor,
July 1-20, and September 1-October 12, 1937-------------------7,      846. 90

        Total for all work----------------------------------                                           9, 928. 85
  The additional sum of $5,000 can' be profitably expended during
the fiscal year ending June 30, 1939, in maintenance snagging as
may be found necessary, from the mouth of Bull Creek, mile 29.5,
to Smiths Mills, mile 52, with the U. S. snagboat Wateree and hired
labor.
                                 Cost and financial summary
Cost of new work to June 30, 1937 _______           _____                        _______ $183, 712.41
Cost of maintenance to June 30, 1937--------------194,                                         626. 16

     Total cost of permanent work to June 30, 1937 _______-__-378, 338. 57
Minus accounts payable June 30, 1937---------- ____  -- ______  .2, 081. 95

        Net total expenditures              -------------------------------                        376,25. 62
Unexpended balance June 30, 1937------------                                                   -       4, 928. 85
        Total amount appropriated to June 30, 1937-----------_                                     381, 185. 47

        Fiscal year ending June 30             1933         1934         1935          1936                  1937

Cost of new work-- - - - - - - -         -- - - --           - - - - -          --   --       ------------
Cost of maintenance-.------------------ $11,359. 56          $37. 50   $3, 900. 32   $4, 741. 36         $2, 528.97
Total expended---.-----------------------    11, 069. 61     327. 46    3, 912. 74    4, 546.46                611.95
Allotted-...---------------------------      10, 085. 47   5,000.00     4,000.00      5,000.00..


Balance unexpended July 1, 1936_-----------------------------$5, 540. 80
Gross amount expended_______---------_--------        - $629. 50
Less reimbursements collected---__-------- ----------     17. 55
                                                                 611. 95

      Balance unexpended' June 30, 1937 .- _______-----_- - -                                          4, 928. 85
Outstanding liabilities June 30, 1937-----__-----------------                                          2, 081. 95

     Balance available June 30, 1937____  _________-----------2, 846. 90
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937___------------------------------------ 5, 000. 00
        Balance available for fiscal year 1938 ------------------                                      7, 846. 90

Amount that can be profitably  expended in fiscal year  ending - June                              -
130, 1939, for maintenance
                                                __ ___-
                            1 -- -- - - - - --- -- - -
                               _                        __ _                                           5, 000. 00
    Exclusive of available funds.
       RIVERS AND HARBORS-CHARLESTON, S. C., DISTRICT              521
      5. WATERWAY FROM WINYAH BAY TO CHARLESTON, S. C.

   Location.-The route of the waterway follows creeks, sounds,
rivers, bays, and extensive marshland cuts beginning at a point 8
miles below Georgetown in Winyah Bay to Charleston Harbor. The
route is tidal throughout and is sheltered from the sea. The distances
from Charleston to McClellanville, Winyah Bay, and Georgetown
are 37 miles, 57 miles, and 65 miles, respectively.
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 90 feet wide at bottom between Charleston
Harbor and Winyah Bay, with a branch channel of the same dimen-
sions to McClellanville. The mean tidal range is 3.5 to 5.1 feet,
according to locality.
   The estimate of cost for new work, revised in 1937, is $2,326,000,
and the latest (1937) approved estimate for annual cost of mainte-
nance is $57,500.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the chan-
nel from Minim Creek to Winyah Bay (Annual Report for 1889,
p. 1184); the act of June 13, 1902, provided for the channel from
Charleston to a point opposite McClellanville (H. Doc. No. 84, 56th
Cong., 1st sess., and Annual Report for 1900, p. 1908); the act of
March 2, 1907, provided for the branch channel to McClellanville
 (Annual Report for 1903, p. 1133); the act of March 2, 1919, pro-
vided for extending the channel to Minim Creek and thence through
the Estherville-Minim Creek Canal to Winyah Bay (H. Doc. No.
178, 63d Cong., 1st sess.); the act of March 3, 1925, provided for
the cut across the Santee Delta at Four Mile Creek (H. Doc. No.
237, 68th Cong., 1st sess.) ; the act of August 30, 1935, provided
for enlarging the channel from Winyah Bay to Charleston includ-
ing the branch channel to McClellanville to a depth of 10 feet and
a bottom width of 90 feet (Rivers and Harbors Committee Doc. No.11,
72d Cong., 1st sess.); and the act of August 26, 1937, provided for
further enlargement of the channel from Winyah Bay to Charleston,
including the branch channel to McClellanville to a depth of 12
feet and a bottom width of 90 feet. (Rivers and Harbors Committee
Doc. No. 6, 75th Cong., 1st sess.) The modifications adopted by the
act of 1935, were previously authorized September 6, 1933, by the
Public Works Administration.
   For latest published maps see the two last-named documents.
   Local cooperation.--The act of August 26, 1937, provides that local
interests furnish, free of cost to the United States, necessary rights-
of-way and spoil-disposal areas for new work and subsequent main-
tenance and bear the costs of all necessary modifications to bridges.
Local cooperation imposed by other acts has been complied with.
   Terminal facilities. Several small landings are located at con-
venient places along the waterway and creeks and bays connecting
with it. The facilities are sufficient for present commerce.
   Operations and results during fiscal year.-The U. S. dredge
Colonel G. P. Howell, in restoring project dimensions, removed
52,932 cubic yards from the northerly 1,700 feet of Estherville-
Minim Creek Canal, 61,722 cubic yards from two shoals, one at mile
7.0 and the other at mile 35.1, 113,752 cubic yards from the branch
channel to McClellanville; and placed 17,092 cubic yards in strength-
522       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

ening and rebuilding dikes and dams between South Santee River
and McClellanville to protect rice fields and timber. Restoration
of project dimensions was completed in the reach between mile 9
and mile 24 next north of Charleston Harbor by the removal of
96,842 cubic yards and in two reaches between a point 2 miles south
of McClellanville and a point 5 miles north of McClellanville by the
removal of 527,625 cubic yards, both under contract.
   Costs during the year were $3,521.04 for dredging in Estherville-
Minim Creek Canal, $5,883.73 for dredging at miles 7 and 35.1,
$12,389.93 for dredging the branch channel to McClellanville, $3,-
570.91 for strengthening and rebuilding dikes and dams, all by
Government plant and hired labor; $13,137.13 for dredging by con-
tract between mile 9 and mile 24 next north of Charleston Harbor,
and $37,138.24 for dredging by contract between a point 2 miles
south of McClellanviIle and a point 5 miles north of McClellanville,
and $2,620.79 for surveys and supervision. The total cost for the
year was $78,261.77, all chargeable to maintenance. The expendi-
tures were $121,008.99.
   Condition at end of fiscal year.-The existing project prior to the
last (1937) modification, was completed in 1936. Surveys made in
June 1937, show that a controlling depth of 10 feet for a width of
90 feet obtains except at Hamlin Creek, 5.5 miles north of Charlestdn
Harbor, where the controlling depth is 7.6 feet for a width of 60
feet, and at several points to the northward, where the controlling
depth is 8.0 feet for project width and 8.4 feet for a width of 60
feet. Dredging to a net depth of 12 feet for a bottom width of
90, feet between Winyah Bay and Charleston is required to complete
the project.
   The cost to date for new work is $433,008.91 from regular funds
and $1,193,857.08 from Public Works funds, a total of $1,626,865.99.
The cost to date for maintenance is $859,678.60 from regular funds,
$13,308.01 from Public Works funds, and $54,915.78 Emergency Re-
lief funds, a total of $927,902.39. The total cost to date for new
work and maintenance amounts to $2,554,768.38. The expenditures
to date are $1,294,870.82 from regular funds, $1,207,165.09 from
Public Works funds, and $54,915.78 Emergency Relief funds, a total
of $2,556,951.69.
   Proposed operations.-The balance unexpended, July 1, 1937,
$16,217.85, together with $66,000 allotted in July, less $1,000 to be
revoked, a net total of $81,217.85, will be applied as follows:
Accounts payable, July 1, 1937--_------_--_----------__----           _    $411.08
Maintenance:
    Dredging to remove obstructing shoals in the tributary channel in
      Porcher Creek, with the U. S. pipeline dredge Colonel G. P.
      Howell and hired labor, Oct. 17-20, 1937__----------_----          1, 000. 00
    Dredging to a net depth of 10 feet for project width of 90 feet
      in the northerly end of the Estherville-Minim Creek Canal and
      in Harbor River, with the U. S. pipe-line dredge Colonel G. P.
      Howell and hired labor, Oct. 21 to Dec. 12, 1937-_____-__--- _-   20, 000. 00
    Dredging as may be found necessary in the 8-mile reach from
      Price creek to Dewees Creek, with the U. S. pipe-line dredge
      Colonel G. P. Howell and hired labor, Jan. 14 to Mar. 5, 1938__ 20, 000.00
                 RIVERS AND HARBORS--CHARLESTON, S. C., DISTRICT                                                                       523

Maintenance--Continued.
    Construction, under contract, of 2 permeable dikes in Western
       Channel of Winyah Bay opposite the mouth of the Esther-
       ville-Minim Creek Canal, Nov. 1, 1937 to Jan. 31, 1938, to
       assist in maintenance of Estherville-Minim Creek Canal en-
      trance      --------------------------------------------      $32, 000. 00
    Supervision of the project, including maintenance studies and
      channel surveys, July 1, 1937, to June 30, 1938______________   7,806. 77

                          Total for all work--------------                                       ------------ ----             81, 217. 85
  The additional sum of $530,000 can be profitably expended during
the fiscal year ending June 30, 1939, in dredging to provide project
dimensions of 12 feet depth for a bottom width of 90 feet between
Winyah Bay and Charleston, S. C., including the branch channel to
McClellanville, by contracts to be let at intervals most advantageous
as regards availability of dredging equipment. In view of the new
work contemplated during the fiscal year 1939 it is not expected
that funds will be required for maintenance work.
                                                    Cost and financial summary

Cost of new work to June 30, 1937_-----------------------                                                             $1, 626, 865. 99
Cost of maintenance to June 30, 1937-------------------------                                                             927, 902. 39

      Total cost of permanent work to June 30, 1937---------12, 554, 768. 38
Undistributed costs June 30, 1937___----- ------------------      2, 594. 39

      Net total cost to June 30, 1937_-----------    -------                                                            2, 557, 362. 77
Minus accounts payable June 30, 1937__-------------------------                                                                 411.08

     Net total expenditures ----------------------------                                                              12, 556, 951.69
Unexpended balance June 30, 1937---.-------           ---------                                                 _              16, 217. 85

             Total amount appropriated to June 30, 1937------------                                                     2, 573, 169. 54

             Fiscal year ending June 30                                1933           1934           1935           1936           1937


Cost of new work_ __                         _-----------------.   ..    ......   $616, 349. 37 $574, 498. 92    $1,008. 79     .--........
Cost of maintenance---...---                 ------------          $37, 064. 58     18,787. 98    20, 070. 21   289, 191.96       $78, 261. 77

         Total cost         ----------------------- .. 37,064. 58                 6 5, 137. 35   594,569. 13    292, 200. 75      78, 261.77

Total expended---....------------------                             36, 741.07    483, 152. 10   736, 900. 96   259, 086.01      121, 008. 99

Allotted-----------...................---........--------------     36, 975. 96 1,355,970.78      66, 243. 66   264, 000. 00    -70, 084. 22


Balance unexpended July 1, 1936_ -------------------------                                                                 $207, 311. 06
Deductions on account of revocation of allotment----------------                                                             70, 084.22

                                         --         -
      Net amount to be accounted for ________________--       _                                                             137, 226. 84
Gross amount expended--------------------- $123, 354. 07
Less:
    Reimbursements collected---------- $2,237. 58
    Receipts from sales----------- -----   107. 50
                                                     2, 345. 08
                                                                                                                            121, 008.99

      Balance unexpended June 30, 1937--------------------                16, 217. 85
Outstanding liabilities June 30, 1937---------------___-----_                 411.08
1Includes $1,207,165.09 Public Works funds, and $54,915.78 Emergency Relief funds.
524            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

     Balance available June 30, 1937------------------------                                            $15, 806. 77
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------                                            66,000. 00

           Balance available for fiscal year 1938 --------------                                         81, 806. 77

Amount (estimated) required           to be appropriated for completion
                     1 - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project                                                                                    530, 000. 00
Amount that can be profitably expended in fiscal year ending
                                         1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
June 30, 1939 for new work                                                                             530, 000. 00
   1
       Exclusive of available funds.

                                        6. SANTEE RIVER, S. C.

   Location.-This river is formed by the confluence of the Congaree
and Wateree Rivers, about 29 miles southeast of Columbia, S. C.
It flows generally southeast for 143 miles and enters the Atlantic
Ocean about 45 miles northeast of Charleston Harbor. (See U. S.
Coast and Geodetic Survey Chart No. 1238 and U. S. Geological
Survey map of South Carolina, 1913.)
   Previous projects.-Adopted by River and Harbor Act of March
3, 1881. Total cost and expenditures were $99,750, for new work
in Mosquito Creek Canal, leading to Winyah Bay. For further
details of previous projects see page 1808 of Annual Report for
1915.
   Existing project.-This provides for snagging the entire river.
The plane of reference for the lower river is mean low water, thd
mean tidal range at the mouth being 5 feet. Tidal action extends to
Lenuds Ferry, 38 miles above the mouth. For the upper river the
plane of reference is ordinary low water, the variation in water level
being 25 feet at Ferguson, 101 miles above the mouth. The project
is one for maintenance. There is no approved estimate of cost for
annual maintenance.
   The existing project was adopted by the River and Harbor Act
approved September 19, 1890 (Annual Report for 1889, p. 1184).
   Terminal facilities.-There are practically no terminal facilities.
Small privately owned sheds, constructed at a few landings as a pro-
tection to freight, have deteriorated beyond use.
   Operations and results during fiscal year.-No work was done'
during the fiscal year. The costs during the year were $107.08 for
surveys and general supervision, chargeable to maintenance.       The
expenditures were $140.18.
   Condition at end of fiscal year.-The river is partially obstructed
by snags and sunken logs, accumulated over a number of years when
no work was done on the river. A survey of the river made during
June 1935 showed that the controlling depth was 6 feet at ordinary
low water. The total costs to date amounted to $166,073.80, all
chargeable to maintenance. The expenditures were $166,073.80.
   Proposed operations.-The balance unexpended, July 1, 1937
 ($167.87) less $150 revoked on July 1, 1937, together with $10,000
allotted during July 1937 and $4,000 to be revoked, a total of
$6,017.87, will be applied to maintenance snagging as may be found
               RIVERS AND HARBORS-CHARLESTON,                                                  S. C., DISTRICT             525
necessary above the crossing of the Intracoastal Waterway, with
the United States snag boat Wateree and hired labor, November 26,
1937-February 15, 1938.
  The additional sum of $5,000 can be profitably expended during
the fiscal year ending June 30, 1939, in maintenance snagging with
the United States snag boat Wateree and hired labor.
                                                  Cost and financial summary

Cost of new work to June 30, 1937----                                                -----------                   $99, 750.   '00
Cost of maintenance to June 30, 1937                                                                                           80
                                                                                                                   1-------------------------66,07
            Total cost of permanent work to June 30, 1937                                                          265, 823.80

Net total expenditures---   ------------------------------                                                         265, 823.80
Unexpended balance June 30, 1937 ---------------------                                                              1 167. 87
            Total amount appropriated to June 30, 1937--------------                                               265,991..67

Fiscal year ending June 30-------.......                   1933               1934          1935      1936              1937


Cost of new work -..... ------------------
Cost of maintenance--.----.----.----------------
                                     ..............                                                  $1, 225. 05          $107. 08
Total expended---------------..................    ....-                   --------                   1, 191.95            140. 18
Allotted..........----------------------                          ---.--                             1, 000. 00       -11, 500. 00


Balance unexpended July 1, 1936---------------------------- $11, 808.05
Deductions on account of revocation of allotment---------------- 11, 500.00
      Net amount to be accounted for---------------------------                                                         308.05
Gross amount expended-------------------------------------                                                              140. 18
     Balance unexpended June 30, 1937-------------------------167. 87
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------------------------------------10,   000. 00
            Balance available for fiscal year 1938---------------___                                                10,167. 87

Amount that can be profitably expended in fiscal year ending June 30,
                          - -  - - -- - -
1939, for maintenance 1___          __   ___________________                                                         5, 000. 00
    1 Exclusive of available funds.

                                                  7. CONGAREE RIVER, S. C.

   Location.-This river is formed by the confluence of the Broad and
Saluda Rivers at Columbia, S. C., and flows southeasterly 50 miles,
there uniting with the Wateree River to form the Santee River. (See
U. S. Geological Survey map of South Carolina, 1913.)
   Existing project.-This provides for a 4-foot navigable channel
over the lower 49 miles of the river, to be secured by dredging and
bank protection, and for the construction of a lock and dam to ex-
tend deep water to Gervais Street Bridge, Columbia, S. C. The
variation in water surface due to freshets is about 24 feet at the
mouth of the river and is about 33 feet at Columbia, the plane of
reference being ordinary low water.
   The estimate of cost of new work, revised in 1925, is $514,000. The
latest (1928) approved estimate of annual cost of maintenance is
$5,200, including $200 for operation and care of the lock and dam.
526          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Data concerning the lock and dam are as follows:
  Location, 2 miles below Gervais Street, Columbia, S. C., 47 miles
above mouth of river.
Lock dimensions:                                                                                    Feet
    Length between miter sills-                       ________________           _______            170
     Clear    width------------------------                                                           55
     Lift -------------------------------------------------------                                     10
     Depth of miter sills at low water-------------                                        ---         66----

  Character of foundation, ledge granite.
  Kind of dam, movable. Chanoine wickets.
  Original structure completed 1904; alterations 1914.
Cost to date:
    Original structure--------------------------------------                                $225, 000
    Alterations ------------------                    ------------                            56, 000

     Total----------------                    --------------------------------                   281,000
  Completed, 1914.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for the improve-
ment of the lower 47 miles (H. Ex. Doc. No. 254, 48th Cong., 2d
sess., and Annual Report for 1885, p. 1140); act of March 3, 1899,
authorized the construction of the lock and dam (H. Doc. No. 66,
53d Cong., 2d sess., and Annual Report for 1896, p. 1183); act of
June 25, 1910, provided for rebuilding the dam and raising the crest
 (H. Doc. No. 608, 61st Cong., 2d sess.); and the act of August 8,
1917, provided for bank protection (H. Doc. No. 702, 63d Cong., 2d
sess.). Operation and care of the lock and dam were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
   Terminal facilities.-There are no public terminals on the river.
The Gulf Oil Corporation has leased the Government reservation at
the lock and dam near Columbia and has constructed an oil terminal
thereon for their own use.
   Operations and results during fiscal year.-The U. S. snagboat
Wateree and U. S. derrick barge No. 6 removed 9,128 snags and
sunken logs between the mouth of the river and mile 47, Colum-
bia, S. C.
   The costs during the year were $31,234.13 for snagging by Gov-
ernment plant and hired labor and $12,449.12 for surveys and studies
of channel conditions, a total of $43,683.25, chargeable to main-
tenance. The expenditures were $49,029.90.
   Operating and care of lock and dam across Congaree River near
Columbia, S. C.-Ordinary repairs were made during the year by
hired labor for the maintenance and preservation of property. The
costs and expenditures during the year were $11.78.
   The total expenditures during the year for maintenance and for
operation and care of the lock and dam were $49,041.68.
   Condition at end of fiscal year.-That portion of the existing
project which covers dredging and bank protection is about 71
percent completed, the work remaining to complete consisting of the
revetting of about 20,000 feet of banks in the vicinity of Congaree and
Gill Creeks, beginning about 5 miles below Columbia. As a result
of snagging operations during 1936 and 1937, the most objectionable
        RIVERS AND HARBORS--CHARLESTON,                            S. C., DISTRICT     527

of the snags and sunken logs accumulated over a period of years
when no work was done have been removed and the river reopened
to navigation. Surveys made during June 1937 showed that the
controlling depth, except during the low stage resulting from the
week-end closing of upstream power plants, is 4 feet.
  The portion of the project covering the lock and dam has been
completed as described in paragraph, "Existing project." The lock
and dam were placed out of commission in August 1920, the ma-
neuver boat and other property have been sold or removed, and
the buildings and grounds are being rented for use as an oil terminal.
  The total costs to date are $364,823.87 for new work, $107.86 for
operating and care, and $384,344.10 for maintenance, a total of
$749,275.83. The total expenditures were $749,275.83.
  In addition, the sum of $109,833.10 was expended between August
7, 1906, and June 30, 1935, on the operation and care of the works
of improvement under the provision of the permanent indefinite
appropriation for such purposes.
  Proposed operations.- The balance unexpended July 1, 1937
($224.81), together with $61,000 allotted during July 1937, less
$50,400 to be revoked, will be applied as follows:
Maintenance :
    Removal of obstructions in the form of snags, overhanging
      trees, and logs, between the mouth and the lock and dam
      near Columbia, by the U. S. snagboat WVateree and hired
      labor, Feb. 16-Apr. 30, 1938--------------------- ----------- $7, 600. 00
    Surveys and studies, July 1, 1937-June 30, 1938--------------    2, 724. 81
    Maintenance and protection of property at lock and dam near
      Columbia, S. C., July 1, 1937-June 30, 1938--                     500. 00

        Total for all work--------------------------------------                 10, 824. 81
  The additional sum of $68,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
New work:
    Construction of training walls and spur dikes for bank pro-
      tection and channel rectification, by contract, July 1-Oct.
      31, 1938---------------------------------------- ------- $50, 000.00
Maintenance :
   Removal of obstructions in the form of snags, overhanging
      trees, and logs, between the mouth and the lock and dam
      near Columbia, by the U. S. snagboat Wateree and hired
      labor, Oct. 1, 1938-Feb. 28, 1939----------------------     18, 000. 00

        Total for all work--------------------------------------                 68, 000. 00
                                     Cost and financial summary

Cost of new work to June 30, 1937----------------------------                  $364, 823. 87
Cost of maintenance to June 30, 1937------------------------                  1494,  285. 06
      Total cost of permanent work to June 30, 1937------------- 859, 108. 93

Net total expenditures_---------------------------------------859, 108. 93
Unexpended balance June 30, 1937------------------------------     224.81

       Total amount appropriated to June 30, 1937----- ---------               859, 333. 74
1 Includes $109,833.10 from permanent indefinite appropriation.


     20196-37-pt. 1--34
528            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


           Fiscal year ending June 30                     1933               1934           1935             1936            1937

Cost of new work.-------------------------------.---------
Cost of maintenance-----------------------                    $54. 37        $274.94          $15. 98    $19, 880.16       $43, 695. 0

Total expended-------...    ------------------                 54. 37         248. 03          42. 89      14, 533. 51      49, 041. 68

Allotted      ------------------------                   --     1. 09 -12,    581. 55         300. 00      52, 000. 00      11, 500. 00


Balance unexpended July 1, 1936--------------------------------$37, 766.49
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936------------------------------               11, 500. 00

                                                                                            __
      Amount to be accounted for ------- ------
Gross amount expended --------------                                                           ______-_____- 49, 266. 49
                                                                                                             49, 041.68

     Balance unexpended June 30, 1937------------------------      224. 81
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------------10, 600. 00

           Balance available for fiscal year 1938__-_________________                                                    10, 824. 81

Amount (estimated)                required to be appropriated for completion
   of existing project 2_______________________________                                                                149, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -               50, 000.00
                               - -- --- -- -- -            -     - -
   For maintenance ______                    ___ ___________                              ______                         18, 000. 00
                     -- -   - -   - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
           Total 2                                                                                                       68, 000. 00
   2 Exclusive of available funds.

                                  8. CHARLESTON HARBOR, S. C.

   Location.-This harbor is on the coast of South Carolina, about 15
miles southerly of the middle point of the coast line, 50 miles south-
west of Winyah Bay, S. C., and 80 miles northeast of the mouth of
the Savannah River. (See U. S. Coast and Geodetic Survey Charts
Nos. 1239 and 470.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, June 18, 1878, August 11, 1886, March 3, 1899, June 25,
1910, August 8, 1917, and July 18, 1918.
   The total cost and expenditures were $6,988,444.61, of which
 $6,586,455.11 was for new work and $401,989.50 was for maintenance.
Of the expenditure for new work $1,032,254.09 was applied to work
on the 40-foot project adopted by the 1918 act. For further details
see page 1808 of Annual Report for. 1915, and page 579, Annual
Report for 1926.
   Existing project.-This provides for commercial purposes a chan-
nel 30 feet deep, 1,000 feet wide, from the sea to the inner end of the
jetties, thence 600 feet wide to the navy yard, and thence 400 feet
wide to Goose Creek, with a turning basin 700 feet wide at the port
terminals, together with a channel 30 feet deep at mean low water
and 500 feet wide through Town Creek, at a total estimated cost of
$314,000 for new work, with $95,000 annually for maintenance.
   The project also provides for a 40-foot channel 1,000 feet wide from
the sea to the inner ends of the jetties, these jetties to be of stone on
log mattress foundation, the north jetty having a length of 15,443
       RIVERS AND HARBORS-CHARLESTON, S. C., DISTRICT             529
feet and the south jetty 19,104 feet, thence 600 feet wide to the south
pier at the navy yard, and thence 1,000 feet wide to the comman-
dant's wharf, at: an estimated first cost of $3,603,000 and $250,000
annually for maintenance, both figures being additional to the esti-
mates for the commercial project given above, and that it be con-
sidered as a national defense rather than a commercial measure and
be prosecuted only as found necessary in the interest of national
defense.
   The above estimates were made in 1925, and are exclusive of
expenditures on previous projects.
   The mean tidal range is 5.2 feet, though this is increased to 7 or
8 feet under the influence of northeast winds or storms of long
duration.
   The existing project was adopted by the River and Harbor Act of
January 21, 1927 (H. Doc. No. 249, 69th Cong., 1st sess.), and is a
modification of the following river and harbor acts: The act of
June 18, 1878, provided for the two jetties and for auxiliary dredg-
ing (Annual Report for 1878, pp. 553-572); act of August 8, 1917,
provided for increase in depth to 30 feet, with a width of 500 feet
between the jetties and 1,000 feet seaward thereof (H. Doc. No. 288,
62d Cong., 2d sess.) ; and the act of July 18, 1918, provided for the
40-foot channel (H. Doc. No. 1946, 64th Cong., 2d sess., pt. I, pp.
21-29, 57, 58, and 64-68). The latest published maps are printed in
House Document No. 249, Sixty-ninth Congress, first session.
    The act of July 18, 1918, provided that the 40-foot channel up to
the navy yard should not be undertaken "until the proposed new dry-
docks at this navy yard, carrying a depth of 40 feet of water over
the blocks, has been authorized." This dock was authorized in the
Naval Appropriation Act approved July 1;,     1918 (40 Stat. L. 725).
    Local cooperation.-Fullycomplied with.
    Terminal facilities.-Piersand slips extend for about 1 mile along
the eastern water front of the city of Charleston, and an additional
mile is covered by marginal wharves. The Port Utilities Commis-
sion of the city of Charleston owns the terminals at Columbus Street,
a large pier near Market Street, and two piers at Tradd Street. It
also owns and operates the belt-line railway serving all wharves and
warehouses and connecting with trunk lines entering the city. Its
wharves are open to the public on a charge basis. Modern facilities
exist also at the coal pier of the Southern Railway and at the
wharves of the Standard Oil Co., the Charleston Dry Dock &
Machine Co., the Clyde Steamship Co., and the Seaboard Air Line
Railway Co.
    On Cooper River above the navy yard a compress and warehouse
company has a marginal wharf 700 feet long; and the Texas Corpo-
ration, the Sinclair Refining Co., and the Read Phosphate Co. main-
tain piers at their property.
    About 10 miles above the city, the port terminals, with a marginal
wharf 2,030 feet long, having extensive warehouses and rail con-
nections built for Army purposes and now owned by the city of
Charleston, have been leased to the West Virginia Pulp & Paper
Co. The facilities are considered adequate for existing commerce.
    Operations and results during fscal year.-Under section 3 of the
River and Harbor Act of July 3, 1930, the United States pipe-line
530      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

dredge Colonel G. P. Howell removed 12,000 cubic yards in Butler
Creek and 9,229 cubic yards in Shem Creek, and 12,475 cubic yards
were removed under contract in Beresford Creek, all tributary
channels to Charleston Harbor.
    The costs during the year were $977.20 for dredging in Butler
Creek, $963.62 for dredging in Shem Creek, both by Government
plant and hired labor, $2,768.04 for surveys and supervision, and
 $1,000 for dredging in Beresford Creek under contract, a total of
 $5,708.86, all chargeable to maintenance. The total expenditures
were $5,638.53.
    Condition at end of fiscal year.-The commercial project is 98 per-
cent completed. The jetties protecting the entrance channel across
the bar were completed in 1895. The north jetty is 15,443 feet long
and the south jetty 19,104 feet long; the distance between their axes
at the outer end is 2,900 feet, and their height, as originally built,
was 12 feet above mean low water for the greater part of their
length.
   A survey of the Charleston Harbor bar made in June 1937 shows
that the entrance channel has a depth of 30 feet for a width of 900
feet and that the channel between the jetties has a depth of 30 feet
for a width of 865 feet. Surveys made in June 1937 of Cooper
River and Town Creek show that from the inner end of the jetties
to the navy yard via the Cooper River there is a 30-foot channel
600 feet wide except at the north end of Drum Island where the
depth is 27 feet for project width and 29 feet for a width of 400
feet. From the navy yard to midway of the Ordnance Depot wharf,
project dimensions obtain. Above this point there is a controlling
depth of 23 feet for a width of 240 feet within project channel lines
and a depth of 30 feet for a width of 300 feet nearer midstream.
In Town Creek there is a 30-foot channel for a width of 500 feet.
The substructure of the masonry sea wall of the Engineer Wharf is
in need of further repairs.
   As a result of dredging done by the Navy Department under the
Naval Appropriation Act of August     29,  1916, a channel 30 feet deep
at all stages, 600 feet wide in straight reaches and increased to 1,000
feet at bends extending from deep water in Cooper River to the
United States navy yard, passing to the east of Drum Island, was
completed. Dredging done in connection with the construction of
the Army supply base at North Charleston provided a channel 30
feet deep at mean low water, with a varying width of 400 to 800
feet from the navy yard to above the supply base, a distance of 31/2
miles. Work remaining to be undertaken consists of the widening
of the channel between the jetties to 1,000 feet and the extending of
the channel from the Ordnance Depot Wharf to Goose Creek.
   The costs to date amount to $295,947.32, from regular funds and
$57,813.37 from Public Works funds, a total of $353,760.69 for new
work, and $445,993.50 from regular funds and $56,086.63 from Public
Works funds, a total of $502,080.13 for maintenance; a total of
$855,840.82.
   The total expenditures to date amount to $741,073.94 from regular
funds and $113,900 from Public Works funds, a total of $854,973.94.
             RIVERS AND HARBORS-CHARLESTON,                                        S. C., DISTRICT                  531
  Proposed operations.-The balance unexpended July 1, 1937
($24,634.15), together with $106,500 allotted during July 1937 and
$14,500 to be allotted, will be applied as follows:
Accounts payable, July 1, 1937_------              --------------------------   $866. 88
New work:
   Dredging to complete the channel between the jetties to a depth
      of 30 feet for a project width of 1,000 feet, with a United States
      hopper dredge and hired labor, Apr. 1-18, 1938-------------              8, 500. 00
Maintenance:
   Dredging to restore project dimensions and provide advance
      maintenance in the outer bar channel, with a United States
      hopper dredge and hired labor, Apr. 19-June 30, 1938------- 123, 500. 00
    Surveys and supervision of the project, July 1, 1937-June
      30, 1938 -----------------------------------                            12, 767. 27
                Total for all work-----------------                                ------------- 145, 634. 15
  The additional sum of $72,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
Maintenance :
   Dredging outer bar channel, with a United States hopper dredge and
      hired labor, 2 months-----------------------------          ----- $30, 000
   Dredging as may be found necessary in Cooper River and in Town
      Creek, with Government plant and hired labor, 2 months-------- 24, 000
    Surveys of channels and supervision of the project, July 1, 1938-
      June 30, 1939-----------------------------------------18,00
                Total for all work                                                              72, 000
                                                             .-------------------.---------------
                                          Cost and financial summary

Cost of new work to June 30, 1937---------------    ------- --- $6, 940, 215.80
Cost of maintenance to June 30, 1937__-------------------------     904, 069. 63

      Total cost of permanent work to June 30, 1937----------  7, 844, 285. 43
Minus accounts payable June 30, 1937-_------------------------         866. 88

     Net total expenditures_ ---------------------------                                             7, 843, 418. 55
Unexpended balance June 30, 1937---------------------------                                              24, 634.15

           Total amount appropriated to June 30, 1937------------17, 868, 052. 70

      Fiscal year ending June 30             1933            1934           1935              1936              1937

Cost of new work---.....                ---------------- $38, 886. 41     $37, 227. 62 ..
Cost of maintenance----------.............   $11, 609. 33 101, 640. 27     31, 577. 76      $21,422. 16        $5, 708. 86
        Total cost-....---------------11, 609. 33          140, 526. 68    68, 805. 38       21, 422. 16         5, 708. 86
Total expended..-------------              -- 1, 713. 77   132, 250. 73    45, 705. 01      20, 580. 08          5, 638. 53
Allotted_.-_
          .     ...--.-..   ----...   .      7, 519. 29    233, 330. 34   -7, 742. 15        15, 000. 00      -36, 990. 78


Balance unexpended July 1, 1936----------------------------                                                $67, 263. 46
Amount allotted from War Department Appropriation
  Act approved April 9, 1935------------------------     $13.94
Amount allotted from War Department Appropriation
  Act approved May 15, 1936-----------------------    3, 068. 40
                                                                                                             3, 082.34

      Amount to be accounted for-----------------------------                                              70, 345. 80
Deductions on account of revocation of allotment- ------------                                             40, 073. 12

        Net amount to be accounted for_--------       -------------       30, 272. 68
  1 Includes Public Works funds: New work, $57,813.37; maintenance, $56,086.63; total
$113,900.
532          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended -----------------------                              $110, 251.69
Less reimbursements collected-----------------------                        104, 613. 16
                                                                                              $5, 638. 53

      Balance unexpended June 30, 1937------------------------24, 634. 15
Outstanding liabilities June 30, 1937---------------------------- 866. 88

     Balance available June 30, 1937----------------------------23, 767. 27
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------------  106,500. 00

Balance available for fiscal year 1938-----------------                    -----------        130, 267. 27

Amount that can be profitably         expended in fiscal year ending June
                               2 - -- - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1939, for maintenance                                                                    72, 000. 00
2 Exclusive of available funds.

                                   9. ASHLEY RIVER, S. C.

   Location.-Rises near Ridgeville, S. C., and flows southeasterly 40
miles, uniting with the Cooper River to form the harbor of Charles-
ton, S. C. (See U. S. Coast and Geodetic Survey Charts Nos. 1239
and 470.)
   Previous project.-The original project was adopted by the River
and Harbor Act of June 14, 1880. The total cost and expenditures
amounted to $5,500. (For further details see p. 1809, Annual Report
for 1915.)
   Existing project.-This provides for a channel 30 feet deep at mean
low water and 300 feet wide from the mouth to the Standard Wharf,
a distance of 7.25 miles, suitably widened at bends and at the head
of the improvement; and for maintenance, to a depth of 12 feet and
a width of 100 feet, of the approach channel to the Municipal Yacht
Basin. The mean tidal variation is about 5.2 feet.
   The estimate of cost for new work, revised in 1937, is $391,150 ex-
clusive of the amount expended on previous projects. The latest
(1937) approved estimate for annual cost of maintenance is $26,000.
   The existing project was adopted by the River and Harbor Act
of July 25, 1912, and provided for a channel 20 feet deep and 240
feet wide up to the Standard wharf (Rivers and Harbors Committee
Doc. No. 4, 62d Cong., 2d sess.), and act of August 26, 1937, provided
for enlarging the channel to present project dimensions, and for the
maintenance of the entrance channel to the Municipal Yacht Basin
to a depth of 12 feet for a width of 100 feet (Rivers and Harbors
Committee Doc. No. 449, 74th Cong., 2d sess.), which document
contains the latest published map.
   Local cooperation.-Local interests have given assurance that the
necessary spoil-disposal areas will be furnished as required by the
River and Harbor Act of August 26, 1937.
   Terminal facilities.-The facilities extend 51/2 miles above the
United States lighthouse wharf adjacent to Tradd Street and include
the Ashepoo Fertilizer wharf, Planters Fertilizer wharf, the Century
Wood Preserving wharf, and the Chicora and the Standard wharves
of the Virginia-Carolina Chemical Co. The fertilizer-company
wharves are equipped with mechanical unloading devices. These
terminals are considered adequate for existing commerce.
             RIVERS AND HARBORS-CHARLESTON, S. C., DISTRICT                                                                 533

  Operationsand results during fiscal year.--The U. S. pipe-line dredge
Colonel G. P. Howell removed 17,318 cubic yards in the entrance
channel to the Municipal Yacht Basin, a tributary of Ashley River,
under Section 3 of the River and Harbor Act of July 3, 1930, at
a cost and expenditure of $990.78.
   Condition at end of fiscal year.-After-dredging surveys made dur-
ing September 1935 showed that the channel had a controlling depth
of 20 feet for a width of 240 feet except in the upper quarter mile
where the controlling depth was 20 feet for a width of 160 feet.
To complete the project will require dredging to enlarge the channel
to a depth of 30 feet for a width of 300 feet from the mouth to the
Standard wharf, a distance of 7.25 miles, suitably widened at bends
and at the head of the improvement.
   The cost and expenditures to date were $51,150 for new work and
$44,964.25 for maintenance, a total of $96,114.25.
   Proposed operations.-No funds are available and no dredging is
proposed in the Ashley River channel during the fiscal year 1938.
With $1,000 to be allotted later, project dimensions of 12 feet depth
for a bottom width of 100 feet will be restored in the entrance
channel to the Municipal Yacht Basin by Government plant and
hired labor during the first half of the fiscal year when the U. S. pipe-
line dredge Colonel G. P. Howell is in the vicinity.
   The sum of $341,000 can be profitably expended during the fiscal
year ending June 30, 1939, including $340,000 for new work in dredg-
ing under contract to secure project dimensions of 30 feet depth for
a width of 300 feet from the mouth to the Standard wharf, a distance
of 7.25 miles, suitably widened at bends and at the head of the
project; and $1,000 for maintenance dredging by Government plant
to restore project dimensions of 12 feet depth and 100 feet width
in the entrance channel to the Municipal Yacht Basin. In view of
the new work contemplated, it is not expected that maintenance funds
for the river channel will be required.
                                            Cost and financial summary

Cost of new work to June 30, 1937------------------------------- $56, 650. 00
Cost of maintenance to June 30, 1937----    ------------------- 44, 964. 25
      Total cost of permanent work to June 30, 1937----------                                                      101, 614.25
Net total expenditures----  -------------------------------                                                        101, 614. 25
Total amount appropriated to June 30, 1937-----------------                                                        101, 614.25

          Fiscal year ending June 30                             1933          1934           1935         1936           1937


Cost of new work ----                         .......................
                                    ------------------
Cost of maintenance---------------------                          $54.26 -------------------.......      $8, 973.47        $990.78
Total expended....------------------------                          54. 26 ---------------------          8, 973. 47        990. 78
Allotted- -------------------------------------------                                         $9, 000   --------            964. 25


Balance unexpended July 1, 1936-------------------------------                                                           $26. 53
Amount allotted from War Department Appropriation Act approved
  May 15, 1936-------------------------------------------------                                                        1, 000. 00
     Amount to be accounted for_      ----   ------------                                                              1, 026. 53
Deductions on account of revocation of allotment--------------                                                             35. 75

          Net amount to be accounted for--                                   --------------                              990. 78
534      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended -_----                 ----                      $990. 78
Amount (estimated) required to be appropriated for completion
of existing project___-------------------------------------- 340, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
   For new work     ----------------------------------------      340, 000. 00
   For maintenance-          -----------------------------------      , 000. 00
                                                                    1--

      Total--    -----------     -----------------------------      341, 000. 00
                          10. SHIPYARD RIVER, S. C.

   Location.-This waterway is a salt-water, tidal tributary of
Charleston Harbor, S. C. It has its source about one-half mile be-
low the United States navy yard, whence it flows in a southerly
direction for about 3 miles and empties into Cooper River about
three-eighths of a mile above Drum Island. (See U. S. Coast and
Geodetic Survey Chart No. 470.)
   Previous projects.--Adopted by River and Harbor Acts of July
25, 1912, and March 3, 1925.
   Total cost and expenditures prior to adopting the existing project
in 1930 were $4,150 for new work. For further details of previous
projects see page 610, Annual Report for 1932.
   Existing project.-This provides for a channel 30 feet deep at mean
low water and 200 feet wide, widened to 670 feet at the entrance
from deep water in Cooper River, to a point 100 feet above the Gulf
Oil Corporation's terminal, with a turning basin 30 feet deep at the
latter point, and for an extension of this channel 20 feet deep and
100 feet wide, widened at bends, to a point 50 feet above the Tux-
bury Lumber Co.'s wharf.
   The estimate of cost of new work, revised in 1937, exclusive of
amounts expended on previous project, is $100,000. The latest (1937)
estimate for annual maintenance is $25,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 3, 1930, provided for channel depths
of 12 and 20 feet (Rivers and Harbors Committee Doc. No. 13, 71st
Cong., 2d sess.); the act of August 30, 1935, provided for a 28-foot
channel from Cooper River to the Gulf Oil Corporation's terminal,
and the deepening of the channel above that point to 20 feet from
the depth of 12 feet previously authorized without local cooperation
 (Rivers and Harbors Committee Doc. No. 43, 73d Cong., 2d sess.);
the act of August 26, 1937, provided for the enlargement of the
channel to a depth of 30 feet and a width of 200 feet up to the Gulf
Oil Corporation's terminal with a turning basin 30 feet deep at the
latter point (Rivers and Harbors Committee Doc. No. 38, 75th
Cong., 1st sess.). The modifications adopted by the act of 1935 were
previously authorized May 28, 1935, under the Emergency Relief
Appropriation Act of 1935.
   For latest published map see the last-named document.
   Local cooperation.-Local interests have given assurance that the
necessary rights-of-way and spoil-disposal areas will be furnished as
required by the River and Harbor Act of August 26, 1937.
       RIVERS AND HARBORS-CHARLESTON, S. C., DISTRICT                535
    Terminal facilities.-Wharves are maintained by the Tuxbury
Lumber Co. and the North State Lumber Co.; the Gulf Oil Corpo-
ration and the Etiwan Fertilizer Co. have completed large marginal
wharves on the lower one-third mile of the river for the accommo-
dation of large, deep-draft vessels.
    Operations and results during fiscal year.-In restoring project
dimensions in the 28-foot channel from Cooper River to the Gulf Oil
Corporation's terminal, 28,748 cubic yards were removed in the com-
pletion of contract dredging during July 1936, and 119,000 cubic
yards were removed by the U. S. pipe-line dredge Colonel G. P.
Howell during January 1937.
    The costs during the year were $2,283.69 for dredging under con-
tract and $8,750.97 for dredging by Government plant and hired
labor, a total of $11,034.66, all chargeable to maintenance. The ex-
penditures were $41,741.85.
    Condition at end of fiscal year.-The existing project prior to
last (1937) modification was completed in 1936. Surveys made in
March 1937, show that a controlling depth of 28 feet obtains for a
width of 100 feet from Cooper River to the Gulf Oil Corporation's
terminal except in the upper 300 feet, where the controlling depth is
26.8 feet for a width of 100 feet; in the 20-foot channel to the head
of the project the controlling depth is 13.7 feet. To complete the
project will require dredging to enlarge the channel to a depth of
30 feet at mean low water and a width of 200 feet, widened to 670
feet at the entrance, from deep water in Cooper River to a point 100
feet above the Gulf Oil Corporation's terminal, with a turning basin
30 feet deep at the latter point.
    The costs to date amount to $22,753.03 from regular funds and
 $31,563.71 from emergency relief funds, a total of $54,316.74, for new
work, and $47,750.46 from regular funds for maintenance; a total
of $102,067.20.
    The total expenditures to date amount to $70,503.49 from regular
funds and $31,563.71 from emergency relief funds, a total of
$102,067.20.
    Proposed operations.-The balance unexpended, July 1, 1937
 ($1,220.77), less $1,000 revoked July 1, 1937, together with $8,500
allotted in July and $12,000 to be allotted, a total of $20,720.77, will
be applied to maintenance dredging to a net depth of 28 feet for a
bottom width of 120 feet from deep water in Cooper River to the
upper end of the Gulf Oil Corporation's wharf, with the U. S. pipe-
line dredge Colonel G. P. Howell and hired labor, September 26 to
October 16, 1937, and May 15 to June 15, 1938.
    The additional sum of $66,000 can be profitably expended during
the fiscal year ending June 30, 1939, in dredging to provide project
dimensions of 30 feet depth for a bottom width of 200 feet widened
to 670 feet at the entrance from deep water in Cooper River to a
point 100 feet above the Gulf Oil Corporation's terminal, with a
turning basin 30 feet deep at the latter point, at a cost of $41,000
for new work; and in maintenance dredging near the end of the fiscal
year by Government plant and hired labor in removing shoals that
are expected to form as a result of movement of soft material from
536              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the portion of the project above the Gulf Oil Corporation's terminal
into the new deeper channel downstream, at a cost of $25,000.
                                                  Cost and financial summary

Cost of new work to June 30, 1937_-----__-______                                                                  ___-___         _ $58, 466. 74
Cost of maintenance to June 30, 1937                                                                                                 47, 750. 46
           Total cost of permanent work to June 30, 1937-------------106,                                                                  217. 20
Net total expenditures------------------------          ---------------   106, 217. 20
Unexpended balance June 30, 1937---------
                                       _.      ---....-     _____       _   1, 220. 77
            Total amount appropriated to June 30, 1937_______________107, 437.97

           Fiscal year ending June 30                                        1933              1934           1935          1936               1937

Cost of new work----                       -----------------------------------------                                     $31, 563. 71    .--
Cost of maintenance..---__             --------------- ------------                            $141. 72    $5, 532. 32    30, 744. 57     $11, 034. 66
        Total cost.----------------------------------                                            141. 72    5, 532. 32    62, 308. 28      11, 034. 66
Total expended.--..--.----------- ---------                                  $182. 30 ------------          5, 674.04     31, 610. 09      41, 741. 85
Allotted---------------------------------------                                               5,000.00     34, 724. 26    29, 525.08       10, 038. 63


Balance unexpended July 1, 1936 ---------------------------   $32, 923. 99
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-------------------------------------11,      000. 00
     Amount to be accounted for _----------------43,                                                                                       923. 99
Deductions on account of revocation of allotment------------------                                                                         961. 37
      Net amount to be accounted for- ---------                _                                                                        42, 962. 62
Gross amount expended--------------------------       $42,294.28
Less reimbursements collected------------------------552.     43
                                                                                                                                        41, 741. 85

     Balance unexpended June 30, 1937---------    --------------                                                                         1, 220. 77
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937  -------------------------------------                                                                           8, 500. 00

            Balance available for fiscal year 1938_ ---------------                                                                      9, 720. 77

Amount (estimated)                        required to be appropriated for completion
                                                                         .
    of existing project                2----------                                                          ---               -         41, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:     - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For new work 2                                                                                                                       41, 000. 00
                          - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -
   For maintenance 2                                                                                                                    25, 000. 00
             Total 2-      - - - - - - - - - -          - - - - - - - -                - - - - - --
                                                                                                                                        66, 000. 00
   1 Includes $31,563.71 Emergency Relief funds.
   2 Exclusive of available funds.

              11. WATERWAY FROM CHARLESTON TO BEAUFORT, S. C.

  Location.-The waterway begins at the Ashley River entrance of
Wappoo Cut; passes through Wappoo Cut, Stono, Wadmalaw
North Edisto, and Dawho Rivers, North Creek, Watts Cut, and
South Edisto River, Fenwicks Island Cut, Ashepoo River, Ashepoo-
Coosaw Cut, Coosaw River, Brickyard Creek, and Beaufort River
to Beaufort, S. C. The distances from Charleston to Yonges Island,
       RIVERS AND HARBORS-CHARLESTON,          S. C., DISTRICT    537
Martins Point, and Beaufort are 24.5 miles, 26 miles, and 661/2 miles,
respectively. (See U. S. Coast and Geodetic Survey Chart No. 3256.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1881, and June 13, 1902. The cost and expenditures were $133,-
239.22, of which $109,489.64 was for new work and $23,749.58 for
maintenance. For further details see page 613, Annual Report for
1932.
   Existing project.-This provides for a waterway 12 feet deep at
mean low water and not less than 90 feet wide from Charleston to
IBeaufort, S. C., with cut-offs in Wappoo Creek between Church
Flats in Stono River and Wadmalaw Sound between Dawho and.
South Edisto Rivers and between Ashepoo and Coosaw Rivers.
   The mean tidal range is 5.2 feet at Charleston and 7 feet at
Beaufort.
   The estimate of cost for new work, revised in 1937 is $653,000,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $17,000.
   A project for widening and deepening the waterway from Charles-
ton to Beaufort, S. C., was authorized by River and Harbor Act of
March 3, 1925 (S. Doc. No. 178, 68th Cong., 2d sess.). The cut-off
between Ashepoo and Coosaw Rivers was authorized May 28, 1935,
under the Emergency Relief Appropriation Act of 1935 and adopted
by the River and Harbor Act of August 30, 1935 (H. Doc. No. 129,
72d Cong., 1st sess.). The River and Harbor Act of August 26, 1937,
provided for enlarging the channel from Charleston to Beaufort, in-
cluding a cut-off between Church Flats of Stono River and Wad-
malaw Sound, to a depth of 12 feet and a bottom width of 90 feet
 (Rivers and Harbors Committee Doc. No. 6, 75th Cong., 1st sess.).
   For latest published map see the last-named document.
   Local cooperation.-The act of August 26, 1937, provides that local
interests furnish, free of cost to the United States, necessary rights-
of-way and spoil-disposal areas for new work and subsequent main-
tenance, and bear the costs of all necessary modifications to bridges.
Local interests have given assurance that the necessary rights-of-way
and spoil-disposal areas will be furnished as required by conditions
imposed in the authorization of the existing enlarged project.
   Terminal facilities.-The wharves and terminals along the route
are sufficient for present and prospective traffic for some time to
come. At Charleston there are public wharves and terminals in
addition to the many privately owned ones.
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Colonel G. P. Howell removed 83,201 cubic yards of material
in the Ashepoo-Coosaw Cut-off and 100,042 cubic yards of material
in North Creek in restoring project dimensions. Under section 3 of
the River and Harbor Act of July 3, 1930, the U. S. snagboat Wateree
removed 3,080 cubic yards of material in providing a turning basin
in the tributary channel in Abbapoola Creek. There were removed
under contract 160,716 cubic yards of material in making a cut-off
to eliminate an objectionable bend in Wappoo Creek just west of
the highway bridge.
   The costs during the year were $6,718.99 for dredging in Ashepoo-
Coosaw cut-off, $6,805.45 for dredging in North Creek, and $1,000
538       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

for dredging in Abbapoola Creek, all by Government plant and hired
labor; $15,573.42 for dredging in Wappoo Creek under contract; and
$3,692.27 for surveys and supervision, a total of $33,790.13, all
chargeable to maintenance. The expenditures were $33,298.23.
   Condition at end of fiscal year.-The existing project, prior to the
last (1937) modification, was completed in 1936. A channel with
controlling dimensions of 7 feet depth and 75 feet bottom width ob-
tains from Charleston to Beaufort. The completion of the existing
project will require dredging to a net depth of 12 feet for a bottom
width of 90 feet from Charleston to Beaufort, including a cut-off
from Church Flats in Stono River to Wadmalaw Sound.
   The costs to date amount to $95,590.41 from regular funds and
$74,642.87 from Emergency Relief funds, a total of $170,233.28 for
new work, and $170,360.61 from regular funds for maintenance, a
total of $340,593.89.
   The total expenditures to date amount to $265,713.37 from regu-
lar funds and $74,642.87 from Emergency Relief funds, a total of
$340,356.24.
  Proposed operations.--The balance unexpended, July 1, 1937
($4,689.76), together with $16,000 allotted in July, a total of $20,-
689.76, will be applied as follows:
Accounts payable, July 1, 1937_____                                     $237. 65
Maintenance :
    Dredging to a net depth of 7 feet for a bottom width of 75 feet
      in Ashepoo-Coosaw Cut-off, North Creek, and Stono River, with
      U. S. pipe-line dredge Colonel G. P. Howell and hired labor,
      Dec. 8, 1937, to Jan. 13, 1938---------     ------------------  14,000. 00
    Repairs to the stone revetment along Elliotts Cut, placing ap-
      proximately 1,000 tons of additional stone, with U. S. derrick
      barge No. 6 and hired labor, Oct. 1 to 31, 1937------------ ---  5, 000. 00
    Surveys and supervision of the project, July 1, 1937, to June
      30, 1938 ----------        ---------------------------------- 1, 452. 11

         Total for all work------------     ----------------------     20, 689. 76
  The additional sum of $481,000 can be profitably expended during
the fiscal year ending June 30, 1939, in dredging to provide project
dimensions of 12 feet depth for a bottom width of 90 feet between
Charleston and Beaufort, S. C., including the cut-off across the bend
between Church Flats of Stono River and Wadmalaw Sound, by
contracts to be let at intervals most advantageous as regards availa-
bility of dredging equipment. In view of the new work contemplated
during the fiscal year 1939, it is not expected that funds will be re-
quired for:maintenance work.
                         Cost and financial summary

Cost of new work to June 30, 1937-..------------        ---    1 $279, 722. 92
Cost of maintenance to June 30, 1937--------------------------- 194, 110. 19

     Total cost of permanent work to June 30, 1937----------          473, 833. 11
Minus accounts payable June 30, 1937----------------------                 237. 65

     Net total expenditures--------------------- ----------           473, 595. 46
Unexpended balance June 30, 1937__                                      4, 689. 76

      Total amount appropriated to June 30, 1937                     1478,   285. 22
  SIncludes$74,642.87 emergency relief funds.
             RIVERS AND HARBORS-CHARLESTON, S. C., DISTRICT                                                                   539

           Fiscal year ending June 30                      1933          1934           1935               1936             1937


Cost of new work----....---------------------------------..----------................                             -----
                                                                                                    $74, 642. 87 ...........
Cost of maintenance------------.......................   $9, 121. 36     $912.32     $57, 040.08         19, 921. 80      $33, 790. 13
        Total cost--.......---.....------------------     9, 121. 36      912. 32     57, 040. 08        94, 564. 67       33, 790. 13
Total expended.............------------------------       7, 091. 25      654. 66     57, 202. 14        94, 659. 96       33, 298. 23

Allotted--------------------...-------.                   7, 835.31    43, 196. 39   119, 921. 43        15, 000.00        11, 642.87


Balance unexpended July 1, 1936    ---- __----------------- -                                                         $26, 345. 12
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936--- --    -------    ------------                                                                  16, 000. 00
      Amount to be accounted for---------------------------                                                            42, 345. 12
Deductions on account of revocation of allotment ______-----4,                                                             357. 13
      Net amount to be accounted for-----------------------                                                            37, 987. 99
Gross amount expended-- __-____---_-.-----
                         --                       $33, 737.96
Less reimbursements collected -------------------     439. 73
                                                                                                                       33, 298. 23
      Balance unexpended June 30, 1937 --------------------                                                             4, 689. 76
Outstanding liabilities June 30, 1937__.--- --          -                                            -            -        237. 65
     Balance available June 30, 1937-----------------------                                                             4, 452. 11
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------16,                                                                000. 00
           Balance available for fiscal year 1938------------------                                                    20, 452.11

Amount (estimated)- - required   to be appropriated for completion of
                      -   - - -- - -- - -- - -- - -- - -- - -- - -- -- -- - - -- -- -
existing project                                                                                                     481, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work 2---             ---            -         -----                                          481, 000. 00
    2 Exclusive of available funds.

        12. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                       (GENERAL)

  The cost of work during the year amounted to $27,567.53 from
regular funds. The expenditures were $28,636.67. The balance un-
expended and accounts receivable, July 1, 1937, $7, 913. 75, together
with $30,000 allotted during July 1937, a total of $37,913.75, will be
applied as needed during the fiscal year 1938 to payment of expenses
to be incurred under this heading. The additional sum of $25,000
can he profitably expended during the fiscal year ending June 30,
1939.
                                             Cost and financial summary

Cost of new work to June 30, 1937 .......
Cost of maintenance to June 30, 1937 --                                ----- ____                  _____         $226, 213. 78
       Total cost of permanent work to June 30, 1937-----------                                                        226, 213.78
Undistributed cost. June 30, 1937------------------------__                                                             2, 474. 37

       Net total cost to June 30, 1937---------------------------                                                  228, 688. 15
Plus accounts receivable June 30, 1937_--------------------                                                      -___ 40. 48

      Gross total costs to June 30, 1937-------------------------- 228, 728.63
Minus accounts payable June 30, 1937-------------------------       2, 422. 05
            Net total expenditures --------------                                                                      226, 306. 58
    1   In addition, $738 was expended from contributed funds.
540               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Unexpended balance June 30, 1937-------                                             ---------           --------               $7, 873. 27

            Total amount appropriated to June 30, 1937--------------1234, 179. 85

           Fiscal year ending June 30                               1933              1934            1935          1936            1937

Cost of new work----------          ----------------------------         ---------------
Cost of maintenance------------------$33, 504. 38   12, 293.31 $24,859. 52 $22,849. 73 $27,                                           567.   53
Total expended---.                          .-------------------
                                                          34, 789. 69               12, 552. 63     21, 823.83    24, 604.51      28, 636.67
Allotted------.-.....-.....-..-.----                             42, 534. 48        22, 645. 37     28, 000. 00   35, 000. 00---------.


Balance unexpended July 1, 1936---------------------------                                                                   $36, 509. 94
Gross amount expended--------------------- ---- $30, 703. 31
Less reimbursements collected--------------------- 2, 066. 64
                                                                                                                               28, 636. 67
      Balance unexpended June 30, 1937-----------------------                                                                   7, 873. 27
Outstanding liabilities June 30, 1937 --------------------------                                                                2, 422.24
     Balance available June 30, 1937-------------------------5, 451.03
Accounts receivable June 30, 1937------------------------------- 40. 48

     Unobligated balance available June 30, 1937--------------- 5, 491. 51
Amount allotted from War Department Civil Appropriation Act,
approved July 19, 1937------------------------------------     30, 000. 00
            Balance available for fiscal year 1938---------------------35, 491. 51

Amount that can be profitably expended in fiscal year ending June
                                    - --
30, 1939, for maintenance 2__ _________________          ______                                                                25, 000. 00
1 In addition, $738 was expended from contributed funds.
  SExclusive of available funds.
13. OTHER PROJECTS                               FOR WHICH NO ESTIMATES ARE SUBMITTED
                            [Commercial statistics for these projects are given in pt. 2 of report]

                                                                               For last    Cost and expenditures to
                                                                               full re-          June 30, 1937                  Estimated
                         Name of project                                       port see                                         amount re-
                                                                               Annual                                            quired to
                                                                               Report        New work        Maintenance         complete
                                                                                for-

1. Mingo Creek, S. C.1............................--------------------------       1928           $29, 050         $1, 350          (2)

  1Channel    adequate for existing commerce.
  9   Completed.

             14. PLANT ALLOTMENT FOR CHARLESTON, S. C., DISTRICT

                                                Cost and financial summary
Undistributed costs June 30, 1937-------------..------------- $169, 022.44
Plus accounts receivable June 30, 1937------. ---------------- 20, 813. 65

      Gross total costs to June 30, 1937                             836. 09
                                                               1---------------------89,
Minus accounts payable June 30, 1937--------------------------    5, 175. 71
     Net total expenditures------------------------------- 184, 660. 38
Unexpended balance June 30, 1937--.--------------------------8, 645. 07
            Total amount appropriated to June 30, 1937- ------------                                                           193, 305. 45
          RIVERS AND HARBORS-CHARLESTON,                                                      S. C., DISTRICT                            541


   Fiscal year ending June 30            1933                    1934                 1935                      1936                 1937

Total expended............................                       -.......     $127, 303. 59                   $47, 541.08            $9, 815. 71
Allotted-----------------------
        ..................               ---------------------                 152, 305. 45                    41,000. 00        .............


Balance unexpended July 1, 1936 ------------------------                       $18, 460.78
Gross amount expended--    -----------------------               $299, 223. 29
Less:
    Reimbursements collected----------             $288, 397. 50
    Receipts from sales----------------               1, 010. 08
                                                                  289, 407. 58
                                                                                 9, 815. 71

      Balance unexpended June 30, 1937----------------------                                                                       8, 645.07
Outstanding liabilities June 30, 1937--- -------------                                                              ---            7, 141. 36

     Balance available June 30, 1937------------------------                                                                      1, 503. 71
Accounts receivable June 30, 1937 ----------------------------                                                                   20, 813. 65

      Unobligated balance available June 30, 1937---_____________                                                                22, 317.36

Status of reports called for by river and harbor acts and committee resolutions

                                                              Date trans-
        Locality               Authorization Act               mitted to                            Doc. No.                    Recommenda-
                                                               Congress                                                             tion

Abbapoola Creek, Johns        Rivers and Harbors             --------------        ---------------------
                                                                                                       "--

Island, S. C.                  Committee resolu-
                               tion, Apr. 13, 1937.
Beresford Creek, S. C.,       River and Harbor Act,          --------------

from Cooper River to          Aug. 26, 1937.
Bridge         Farm
Wharves.
Cape Fear River, N. C., Rivers and Harbors                   Dec. 10, 1936                          .....
                                                                                     .----------------                          Unfavorablej
to St. Johns River,      Committee resolu-
Fla., Intracoastal Wa-   tion, Jan. 14, 1936.
terway, construction
anchorage basin at
Myrtle Beach, S. C.
Cape Fear River, N. C., Rivers and Harbors                   Sept. 21, 1936          Rivers and Harbors Favorable.
to St. Johns River,      Committee resolu-                                            Committee, 6, 75th
Fla., improvement be-    tion, Feb. 11, 1936.                                        Cong., 1st sess.
tween Cape Fear Riv-
er and Savannah, Ga.
Charleston, S. C., to River and Harbor Act,                  Nov. 19, 1936                                                      Unfavorable.
  Columbia, S. C., wa-    Aug. 30, 1935.
terway.
Charleston Harbor and Rivers and Harbors                     ..............-
  Cooper River, S. C.      Committee resolu-
                           tion, June 8, 1937.
Pee Dee (Great) River, Rivers and Harbors
S. C.                     Committee resolu-
                           tion, Apr. 1, 1937.
Pee Dee River S. C., Rivers and Harbors                      Dec. 28,1936                                                          Do.
  from Jericho Oreek to    Act, Aug. 30, 1935.
  the Thoroughfare.
Russell Creek, S. C..... Senate Committee res-               -..-..........-
                           olution, Mar. 20,
                           1937.
Shem Creek from Hog River and Harbor Act,
  Island Channel, S. C.    July 3, 1930.
Shipyard River, S. C__...Rivers and Harbors
                           Committee resolu-
                                                             June 16,1937            Rivers and Harbors
                                                                                       Committee, 38, 75th
                                                                                                                                Favorable.
                           tion, Feb. 16, 1937.                                        Cong., 1st sess.
Waccamaw River, S.   C.  Rivers and Harbors
                           Committee resolu-
                                                             Jan. 21,1937          ............-..........-                     Unfavorable.
                           tion, June 4, 1936.
Winyah Bay, S. C.....    Rivers and Harbors
                           Committee resolu-
                           tion, Jan. 27, 1937.
                          I                              I                     I                                            I
542      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
           SAVANNAH, GA., DISTRICT
  This district includes all watersheds and harbors in the State of
Georgia tributary to the Atlantic Ocean; Fernandina Harbor, Fla.,
and St. Marys River, Ga. and Fla., and their tributary streams; the
waterway between Beaufort, S. C., and Cumberland Sound, Ga., and
that part of South Carolina embracing the Beaufort, Broad, and
Savannah River Basins, except the intracoastal waterway north of
Beaufort, S. C.
  District engineer: Lt. Col. C. Garlington, Corps of Engineers, to
July 12, 1936, and Lt. Col. R. F. Fowler, Corps of Engineers, since
that date.
  Division engineer: Col. Earl I. Brown, Corps of Engineers.
                                IMPROVEMENTS

                                  Page                                       Page
1. Savannah Harbor, Ga------.-   542 7. St. Marys River, Ga. and
2. Savannah River below Au-                Fla -5_______---    __--- -       561
              -------------
     gusta, Ga__                 546 8. Fernandina Harbor, Fla ...           562
3. Waterway between Beaufort,         9. Examinations, surveys, and
     S. C., and St. Johns:River,           contingencies (general)-__        564
     Fla. (Beaufort, S. C., to       10. Other projects for which no
     Cumberland Sound section)_  551       estimates are submitted_ _        565
4. Altamaha, Oconee, and Oc-         11. Plant allotment ------------        565
     mulgee Rivers, Ga--------   555 12. Savannah River at Augusta,
5. Brunswick Harbor, Ga .------  557       Ga., flood control.....--------   566
6. Satilla River, Ga_-----------560

                        I. SAVANNAH HARBOR, GA.

   Location.-The entrance is 75 statute miles south of Charleston
Harbor, S. C., and 70 statute miles north of Brunswick Harbor, Ga.
 (See U. S. Coast and Geodetic Survey Chart No. 440.)
   Previous projects.-Adopted by specific acts of Congress May 18,
1826, March 3, 1855, August 7, 1856, and by River and Harbor Acts
of March 3, 1873, June 23, 1874, September 19, 1890, June 3, 1896,
and June 13, 1902. The cost and expenditures on these projects
prior to 1912 were: For new work, $7,260,383.98; for maintenance,
$298,894.26; total, $7,559,278.24. For further details see page 1810
of Annual Report for 1915.
   Existing project.-This consists of further improvement under a
modified project by eliminating (a) the regulating dam across South
Channel, (b) the relocation of the inland waterway in the vicinity,
and (c) the further extension of training walls and revetments and
jetties and providing for-
    (a) Channels of the following dimensions: 30 feet deep and gener-
ally 500 feet wide from the 30-foot contour in the ocean to the quar-
antine station, 10.2 miles; thence 30 feet deep and generally 400 feet
wide to the Seaboard Air Line Railway bridge, 16 miles; thence 26
feet deep and 300 feet wide to the foot of Kings Island, 1.3 miles;
thence 26 feet deep and 200 feet wide to the vicinity of the terminal
of the Atlantic Creosoting Co., 2.1 miles; a total length of 29.6
miles.
          RIVERS AND HARBORS-SAVANNAH,          GA., DISTRICT       543
    (b) Enlargement of contracted portions of the channel and such
enlargements of the channel as may be necessary to smooth out ab-
rupt changes and for otherwise improving the hydraulic conditions
with a view to reducing shoaling.
    (c) A turning basin near the upper end of the harbor to be formed
by widening the 26-foot channel to 600 feet for a length of 600 feet,
and providing proper approaches.
   (d) The maintenance of the channels, anchorage basins, enlarge-
menits'at Drakies Cut, Kings Island, West Broad and Barnard
Streets, mooring dolphins near Fort Oglethorpe, and the existing
training walls and jetties.
   The plane of reference is mean low water, which varies for
different parts of the harbor. The mean range of tide is 6.8 feet at
the upper end of the harbor and 6.9 feet at the lower end. Extreme
ranges are about 10.2 feet and 11.0 feet, respectively. The mean tidal
range has been increased, by the improvement, about 2.5 feet at the
upper end.
   The estimate of cost for new work, revised in 1935, is $5,600,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $500,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1874, provided for works of regula-
tion (Annual Report for 1873, p. 747); act of March 2, 1907, made
tentative provision for a 26-foot channel from the quarantine sta-
tion to the Seaboard Air Line Railway bridge (H. Doc. No. 181,
59th Cong., 1st sess.), which was definitely adopted by the act of
June 25, 1910; act of August 8, 1917, provided for that part of the
30-foot channel from the sea to the quarantine station (H. Doc.
No. 1471, 64th Cong., 2d sess.); act of January 21, 1927. provided
for a 21-foot channel above Kings Island (H. Doc. No. 261, 69th
Cong., 1st sess.) ; and for other features (H. Doc. No. 262, 69th Cong.,
1st sess.); the 26-foot channel from the Seaboard Air Line Railway
to the foot of Kings Island was provided for by the River and
Harbor Act of July 3, 1930 (S. Doc. No. 39, 71st Cong., 1st sess.).
The remaining features of the project were provided for by the
act of August 30, 1935 (H. Doc. No. 276, 73d Cong., 2d sess.). The
latest published maps are in the last-named document.
   Local cooperation.-The River and Harbor Act approved August
30, 1935, imposes the condition that local interests shall furnish,
without cost to the United States, suitable disposal areas for the
dredged material if and when needed, both for new work and for
maintenance. By resolution adopted March 13, 1929, the city of
'Savannah made available certain lands necessary for improvement
and the future maintenance of the harbor at Kings Island, and binds
itself to furnish, when required, such dumping ground as may be
needed in the future improvement and maintenance of Savannah
Harbor. The city of Savannah has secured for the United States
practically all of the dumping privileges required for improvement
under the existing project.
   Terminal facilities.-This improvement serves numerous wharves
and piers owned by individuals and corporations, a municipal wharf,
       20196-37-pt. 1- 35
544      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  and the terminals of three trunk-line railways and two ocean steam-
ship companies. For further details see Port Series No. 10, Corps of
Engineers (revised 1935).
    Operations and results during iscal year-New work.-Govern-
ment plant and hired labor operated on the 30-foot section of the
harbor between Quarantine Station and the westerly end of South
Channel, and enlarged a portion of the channel east of Quarantine
  Station so as to improve hydraulic conditions and reduce shoaling.
This work resulted in the removal of 3,301,851 cubic yards of mate-
rial at a cost of $233,779.78. Contract dredging to project dimensions
on the 30-foot channel between the westerly end of South Channel
and the Seaboard Air Line Railway bridge, on the 26-foot channel
from the foot of Kings Island to the upper end of the harbor, and on
the turning basin near the upper end of the harbor, resulted in the
removal of 2,568,729 cubic yards of material at a cost of $615,762 26.
    Maintenanc.-There were removed by Government plant and
hired labor 3,754,432 cubic yards of material between the United
States Engineer Yard and the sea, at a cost of $372,458.85. Engineer-
ing studies and surveys were made, at a cost of $13,116.49. A con-
tract for removal of the remains of White Hall Channel training
wall and replacing it by three spur dikes was completed, at a cost
of $21,353.23.
    The total cost of all work was $1,256,470.61, of which $849,542.04
was for new work and $406,928.57 for maintenance. The total ex-
penditures were $1.150.212.95.
    Condition at end of fiscal year.-The existing project is 90 per-
cent completed. The following sections of the 30-foot channel have
been completed: 30-foot contour in the ocean to Quarantine Station
in 1930; Quarantine Station to Fields Cut in 1937; and westerly end
of South Channel to the Seaboard Air Line Railway bridge in 1937.
That part of the 26-foot channel from the Seaboard Air Line Rail-
way bridge to the foot of Kings Island was completed in 1931; and
the remaining part from the foot of Kings Island to the Atlantic
Creosoting Co.'s wharf, including the turning basin near the up-
per end of the harbor, was completed in 1937. The anchorage basin
and mooring dolphins near Fort Oglethorpe were completed in 1926.
The enlargements at Drakies Cut, Kings Island, and at West Broad
and Barnard Streets were completed in 1931, 1929, and 1924, re-
spectively. Whitehall Channel training wall was completed in 1929
and was replaced by three spur dikes in 1937. Long Island train-
ing wall was completed in 1931, and other training walls and jetties
prior to 1929. In June 1937 the '30-foot section of the channel had
a controlling depth of 28.8 feet over a width of 300 feet seaward
of the outer end of the jetties, and in May 1937 a controlling depth
of 27.8 feet over a width of 300 feet between the outer end of the
jetties and the Seaboard Air Line Railway bridge. In May 1937 the
26-foot section of the channel had a controlling depth of 25.7 feet
over a width of 200 feet between the railroad bridge and the foot of
Kings Island, and above this a controlling depth of 27.2 feet over
a width of 110 feet. To complete the project, the following work is
required:
  (a) Dredging to project dimensions the 30-foot section of the channel be-
tween Fields Cut and the westerly end of South Channel.
  (b) Enlargement of portions of the channel to improve hydraulic conditions
and reduce shoaling.
               RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                                        545
  The costs under the existing project were $5,030,655.64 for new
work and $10,369,211.27 for maintenance, a total of $15,399,866.91.
The total expenditures were $15,272,493.65.
  Proposed operations.-The balance unexpended on July 1, 1937
($189,261.38), together with allotments of $761,000 made during July
and September, 1937, less $305,000 to be revoked, or a total of $645,-
261.38, will be applied as follows:
Accounts payable, July 1, 1937__---------------                                                                     $127,373. 26

New work:
   Dredging with United States pipe-line dredge in
     30-foot channel above the jetties, 2 months, be-
     tween July 1 and Dec. 31, 1937____--__---------                                            $58, 000. 00
   Dredging with United States hopper dredge in
     30-foot channel between the jetties and on the
     bar, 4 months, between July 1 and Dec. 31, 1937_                                            104, 000. 00
                                                                                                                       162, 000. 00
Maintenance :
    Dredging with United States pipe-line dredge in
      26- and 30-foot channels, 7 months, between
      July 1. 1937, and June 30, 1938 _ __     _ _ __                                            215, 888. 12
    Dredging with United States hopper dredge in
      30-foot channel between South Channel and the
      outer end of the bar, 5 months, between July 1,
      1937, and June 30, 1938_     ___                                                           140, 000. 00
                                                                                                                       355, 888. 12
            Total for all work ______________----____--
                                                ---                                             ___-_         -        645, 261. 38
  The new work scheduled above will complete the project.
  The additional sum of $500,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance:
   Dredging with United States pipe-line dredge in 26- and 30-foot
      channels, 11 months. between July 1, 1938, and June 30, 1939__ $310, 000
   Dredging with United States hopper dredge in 30-foot channel
      between South Channel and the outer end of the bar, 7 months,
      between July 1, 1938, and June 30, 1939 ________-______- __ 190, 000
            Total for all work                     -
                                                  ________-__-                            --
                                                                                         _________--__                 _     500, 000
                                             Cost and financial summary
Cost of new work to June 30, 1937                               291, 039. 62
                                                            $-------------------------
Cost of maintenance to June 30, 1937-______________________ 10, 668, 105. 53
     Total cost of permanent work to June 30, 1937__________                                                      22, 959, 145. 15
Minus accounts payable June 30, 1937--------- ____ ________                                                           127, 373. 26
     Net total expenditures ______________    _____________                                                       22, 831, 771. 89
Unexpended balance June 30, 1937_-------______________--                                                              189, 261. 38
         Total amount appropriated to June 30, 1937___------__                                                    23, 021, 033. 27

  Fiscal year ending June 30                   1933                   1934             1935               1936                1937


Cost of new work----...._                .        .           .        .                                                    $849, 542. 04
Cost of maintenance...----------          $401, 099. 36           $301, 843. 63      $363, 255. 62    $321, 194. 60          406, 928. 57
      Total cost-.....-...      .....        401, 099. 36          301, 843. 63       363, 255. 62     321, 194. 60        1, 256, 470. 61
Total expended .             ...---------------187, 319. 40        354, 228. 98   -1, 072, 643. 68     341, 841.01         1, 150, 212. 95
Allotted_   -------------                    160, 424. 06          542, 729. 61   -1, 009, 483. 53   1, 246, 000. 00         100, 000. 00
546      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 ___      ---------         $1,239, 474. 33
Amount allotted, from War Department Appropriation Act
approved May 15, 1936----------------- ------------------    100, 000. 00
      Amount to be accounted for-------------------------          1, 339, 474. 33
Gross amount expended---------------------------___                1, 150, 212. 95
      Balance unexpended June 30, 1937----------------------         189, 261. 38
Outstanding liabilities June 30, 1937_------------_ $72,257.31
Amount covered by uncompleted contracts-------- 55, 115. 95
                                                                     127, 373. 26

     Balance available June 30, 1937-----------         ___--61,          888. 12
Amount allotted during fiscal year 1938------------------            761, 000. 00

      Balance available for fiscal year 1938-------------------      822, 888. 12

Amount that can be profitably expended in fiscal year ending
                                 -- ----
June 30, 1939, for maintenance 1___________________  _
                                                                     500,   0CO. 00
1 Exclusive of available funds.
            2. SAVANNAH RIVER        BELOW AUGUSTA,          GA.

   Location.-This river (see U. S. Geological Survey maps of South
Carolina and Georgia) is formed by the confluence of the Tugaloo
and Seneca Rivers on the northwestern part of the South Carolina-
Georgia boundary line. It flows southeast, forming the boundary
line, and empties into the Atlantic Ocean.
   Previous project.--Adopted by the River and Harbor Act of
March 3, 1881. The cost and expenditures on the previous project
prior to 1890 were $93,480.09. A subdivision between new work
and maintenance is not possible. For further details see page 1813
of Annual Report for 1915.
   Existing project.-This provides for a channel 6 feet deep and
75 feet wide (at ordinary summer flow, which corresponds to a
discharge of 4,000 second-feet at Augusta, Ga.), from the upper
end of Savannah Harbor to the head of navigation at Augusta, 3.0
miles above Fifth Street Bridge, a distance of approximately 199
miles. The improvement is to be obtained by the construction of
one lock and dam at New Savannah Bluff, the use of contraction
works, the closure of cut-offs, bank protection, removal of snags,
overhanging trees, and wrecks and the dredging of troublesome
bars. The mean tidal variation at the mouth of the river is 6.9
feet. The freshet variation above the low-water plane of reference
at the head of the improvement is approximately 18 feet ordinarily,
with an extreme of 39 feet. The pertinent data for the lock and
dam are given in the following table:
                  Lock and dam at New Savannah Bluff

Nearest railroad station, Augusta, Ga., 13 miles.
Distance above Bull Street, Savannah, Ga., 188 miles.
Lock dimensions, 56 by 360 feet.
Lift of lock, 15 feet.
Depth on lower miter sill at low water, 10 feet.
Depth on upper miter sill at normal pool level, 14 feet.
Character of foundations-piles in sand, clay, and gravel.
             RIVERS AND HARBORS--SAVANNAH, GA., DISTRICT                                   547
   Kind of dam, fixed?
   Type of construction, concrete.
   Completed, 1937.
   Total cost, $1,473,812.10.
    The estimate of cost for new work, revised in 1935, is $3,340,000,
exclusive of amounts expended on previous projects. The latest
  (1930) approved estimate for annual cost of maintenance and op-
eration is $75,000 for the first 3 years and $50,000 annually there-
after of which $15,000 is for operating and care of lock and dam.
    The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for a 5-foot
channel (H. Doc. No. 255, 51st Cong., 2d sess.) ; the act of June 25,
1910, provided for the special improvement, by bank-protection work,
of 20 or 25 miles of river immediately below Augusta (H. Doc. No.
962, 60th Cong., 1st sess.) ; and the act of July 3, 1930 (H. Doc.
No. 101, 70th Cong., 1st sess.), provided for the 6-foot channel and
the lock and dam. The act of August 30, 1935, provided for a change
in location of the lock and dam. Construction of the lock and dam
at New Savannah Bluff was authorized by the Public Works Admin-
istration September 27, 1933, and adopted by the River and Harbor
Act approved August 30, 1935 (Senate committee print, 73d Cong.,
2d sess.), which document contains the latest published maps. The
act of August 26, 1937, modified conditions of local cooperation
  (Rivers and Harbors Committee Doc. No. 39, 75th Cong., 1st sess.).
    Local cooperation.-The River and Harbor Act of July 3, 1930
  (as amended by River and Harbor Act of August 26, 1937), pro-
vides that local interests shall furnish, free of cost to the United
States, lands required for the lock and dam and appurtenances, and
all flowage and other easements required for the construction and
operation of same and shall provide adequate terminals for the
economical handling of at least 125,000 tons of commerce annually
between Augusta and Savannah exclusive of sand and rafted logs.
    Land required for the construction of the lock and dam and appur-
tenances has been donated to and accepted by the United States.
Local interests have obtained all of the necessary flowage easements
and the titles to these easements are now in the process of being
transferred to the United States. There are now available at
Augusta, terminals adequate for the economical handling of the
commerce specified.
   It is expected that the terms will be fully complied with during
the fiscal year 1938.
    Terminal facilities.-The only water terminals served by this im-
provement are at Augusta and at or near Savannah. At Augusta
the water terminal is owned by the city of Augusta. The Pure Oil
Co. has a terminal with a storage capacity of 27,500 barrels for
berthing and discharging oil barges. At Savannah there is one
municipal wharf, suitable for berths for river steamers, open to the
public on equal terms. In addition, there are extensive facilities
at Savannah, privately owned, for ocean-going and smaller vessels.
   1 Five vertical-lift crest-control gates, set between concrete piers and resting on concrete
sill.
548      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Along the river there are numerous natural landings without wharves
or railway connections. The terminal facilities on this improvement
are considered ample for existing commerce.
    Operations and results during fiscal year--regular funds.-New
work: Work was completed on the lock and dam at New Savannah
Bluff at a cost of $64,255.79 for contract operations and $10,405.02
for Government plant and hired labor. Work was continued on
open channel improvement at a cost of $11,313.03 for contract opera-
tions at mile 181.7, and $7,963.54 for Government plant and hired
labor operations in connection with surveys and preparation of plans
and specifications between mile 181.7 and Savannah harbor.
    Maintenance: Repairs were made to open channel works between
mile 185 and 187, by Government plant and hired labor, at a cost
of $28,167.75. U. S. snag boat Macon operated between Savannah
and Augusta, Ga., removing 1,666 snags and other obstructions, at
a cost of $17,235.44. The lock and dam at New Savannah Bluff has
been in operation since February 1, 1937, and minor improvements
and reconstruction have been made, all at a cost of $7,701.68.
    The total costs were $147,042.25, of which $93,937.38 was for new
work, and $53,104.87 for maintenance. The total expenditure from
regular funds was $82,212.30.
    Public Works funds.-Contract work for the construction of the
lock and dam was completed at a cost of $273,759.50, during the fiscal
year, all for new work. The total expenditure was $348,387.49.
    During the fiscal year the total costs, all funds, were $420,801.75, of
which $367,696.88 was for new work, and $53,104.87 was for main-
tenance including $7,701.68 for operating and care. The total ex-
penditures, all funds, were $430,599.79.
    Condition at end of fiscal year.-The existing project is about 71
percent complete. Construction of the dam at New Savannah Bluff
was completed in 1937 (see table under paragraph "Existing
project"). The controlling depth at ordinary summer water was 5
feet or greater for about 71 percent of the fiscal year. This depth
corresponds to a gage height of 5.5 'feet on Butler Creek gage, and
a discharge of 4,000 second-feet at Augusta. Work remaining to be
done consists of 77 percent of the open-channel work.
    With Public Works funds the total costs and expenditures have
been $1,634,562.24, all for new.work.
    With regular funds, the costs have been $735,400.19 for new work
and $1,006,148.43 for maintenance, a total of $1,741,548.62.          The
expenditures were' $1,673,154.29.
    The total costs, all funds, have been $2,369,962.43 for new work
and $1,006,148.43 for maintenance, a total of $3,376,110.86. The total
expenditures were $3,307,716.53.
    Proposed operations.-The balance unexpended July 1, 1937
  ($81,795.78), together with allotments of $164,500 made during
July 1937, or a total of $246,295.78, will be applied as follows:
Accounts payable, July 1, 1937______ __________________________   _   $68, 394. 33
New work: Completion of open channel works, by contract, at
  mile 181.7, and construction of open channel works, by con-
  tract, between miles 142 and 159, between July 1, 1937 and
  June 30, 1938 ------------------------------------                  110, 711.97
               RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                                        549
Maintenance :
   Dredging with U. S. pipe-line dredge Creighton, 3 months,
      between July 1, 1937 and June 30, 1938-----------------                                                             $32, 689. 48
   Snagging with U. S. snag boat Macon, 4 months, between
      July 1 and Oct. 31, 1937, and between Apr. 1 and June
      30, 1938---------------------------------------------                                                                14, 000. 00
   Repairing, with hired labor, open channel work (pile dikes
      and bank revetment) between miles 185 and 187, between
      July 1, 1937 and June 30, 1938-------------------------                                                               5, 500. 00
        mTn i1
        .1Vta-----------,,--------,----------------------
                                                                                                               _           52, 189. 48

Maintenance (operation and care, lock and dam at New Savannah
Bluff) :
   Operation------------------------------------------------                                                               12, 000. 00
   Ordinary repairs_________------------------------------------------                                                      2, 000. 00
   Improvement and reconstruction_-------                 __________-_                                                      1, 000. 00

        Total-------------_                  --------------------------------------                                        15,000.00

               Total for all work----------------------------------                                                       246, 295. 78
  The additional sum of $355,000 can be profitably expended during
the fiscal year 1939, as follows:
New work:
   Constructing open channel works, by contract, from mile 103.5 to
     mile 47.6, between July 1, 1938 and June 30, 1939-------------_  $230, 000
   Dredging cut-off channel across Bradford Point, by contract----,--   50, 000

      Total for new work_ ----------------------------------------                                                           280, 000
Maintenance :
   Dredging with U. S. pipe-line dredge Creighton, 2 months, be-
      tween July 1, 1938 and June 30, 1939 ___                                                                                20, 000
   Snagging with U. S. snag-boat Macon, 7 months, between July
      1, 1938 and June 30, 1939--------------------------------                                                               24, 500
   Repairing, with hired labor, open channel works below New
      Savannah Bluff Lock and Dam, between July 1, 1938 and
       June      30, 1939____-------------------------                                                                        13, 000

           1    L,
               %J    I    -l-__
                             _    _   ___ __ _   __ ___ _       -          __ _____           _    _____   - ___ __   -       57, 500

Maintenance              (operation and care, lock and dam at New Savannah
Bluff) :
    Operation    _-----------------------                                                                                     12, 000
    Ordinary repairs                                        -------------------                                                3, 000
    Improvement and reconstruction__________________-__                                                                         1, 500
    Emergencies -.--------                           --                           --------------                               1, 000

           -------------------------------------------------------
      Total__                                                                                                                 17, 500
      Total for
      Total     all work-------------------------------------------3500
            for all work___________________                                                                                  355, 000

                                            Cost and financial summary

                                      MAINTENANCOE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937                                                                                     828, 880. 28
                                                                                                                    $---------------------
Cost of maintenance to June 30, 1937--------------------------_                                                    1, 006, 148. 43
      Total cost of permanent work to June 30, 1937__------------ 1, 835, 028. 71
Minus accounts payable June 30, 1937___---------------------------    68, 394. 33
     Net total expenditures----  ---------------------        1, 766, 634. 38
Unexpended balance June 30, 1937-----------------------------     81, 795. 78

      Total amount appropriated to June 30, 1937___-_________                                                      1, 848, 430. 16
550            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


       Fiscal year ending June 30                       1933                1934               1935              1936                 1937


Cost of new work............      ...------------                       ---------------------                 $1, 886. 92          $93, 937. 38
Cost of maintenance----._ ---------------- $96, 439.04                   $44, 304. 81      $61, 376. 14       64, 891. 50           53, 104. 87
                                    96, 439. 04 44, 304. 81
      Total cost------------...........................     61, 376. 14                                       66, 778. 42          147, 042. 25
Total expended----......---.--------------           93. 118. 94            630. 03
                                                                          38,               58, 852. 32       65, 825. 68           82, 212. 30
Allotted     ---------------------------            112, 911.98           74,108. 00        51, 000. 00       88, 000. 00           75, 000. 00


Balance unexpended July 1, 1936____------------------------_                                                              $89, 008.08
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936___-------------------------------------                                                               75, 000.00

Amount to be accounted for-----__-------------------------                                                                164, 008.08
Gross amount expended-----------------------                                                   $92,399.85
Less reimbursements collected--------------------                                               10, 187.55
                                                                                                                            82, 212.30

      Balance unexpended June 30, 1937____---------------                                                                   81, 795.78
Outstanding liabilities June 30, 1937__-------        $11, 011.89
Amount covered by uncompleted contracts ------         68, 995.94
                                                                                                                            80, 007. 83

     Balance available June 30, 1937__--- -----__________      _                                                              1, 787.95
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--- -----------------------------------                                                            164, 500. 00

           Balance available for fiscal year 1938____________________                                                     166, 287. 95

Amount (estimated) required to be appropriated for completion
   of existing project                               ----------------                                                     280, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1- - - - - - - - ------- --- - - -- --- ---- --- - - - -- -
                                                                                                                          280,000. 00
      For     maintenance 1-----                                ------                                                      75, 000. 00

        Total      ---------------------------------------------                                                          355, 000.00
   1 Exclusive of available funds.
                                             PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937                            ------------------------                               $1, 634, 562. 24
Cost of maintenance to June 30, 1937                                                                      .....

      Total cost of permanent work to June 30, 1937----------- 1, 634, 562.24
Net total expenditures ____________-----____            -__   -1, 634, 562.24
Total amount appropriated to June 30, 1937__________ ______     1, 634, 562. 24

   Fiscal year ending June 30               1933                1934                    1935                1936                    1937


Cost of new work........         _      .            . $78, 799. 93
                                                    ..
                                            __-........__                          $324, 110. 05        $957, 892. 76          $273, 759. 50
Cost of maintenance                  _________           ___ _                __- -      __--- _      _---_---------__      __-________

Total expended ..................
                        __     __...               __..... 75. 560. 13                238, 788. 51        971, 826. 11             348., 387. 49
Allotted         __                      ..
                      _____.......................        1,775, 000.00         -137,000. 00              -3, 437. 76...........


Balance unexpended July 1, 1936--___               -$348,
                                        _________-----                                                                         387.49
Gross amount expended --       ----------------------------                                                               348, 387.49
CONSOLIDATED COST AND FINANCIAL SUMMARY FOR SAVANNAH RIVER BELOW AUGUSTA
Cost of new work to June 30, 1937-....-
                                   ,____---                                                                        $2, 463, 442.52
Cost of maintenance to June 30, 1937 ___________----------                                                          1, 006,148. 43
           Total cost of permanent work to June 30, 1937----------                                                    3, 469, 590. 95
                   RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                                       551
Minus accounts payable June 30, 1937 -----------------                                                        ----         $68, 394. 33

     Net total expenditures-.......                                               ._______----------                   3, 401, 196. 62
Unexpended balance June 30, 1937__-- --                                         ____----------------                       81, 795. 78

           Total amount appropriated to June 30, 1937---------__-                                                      3, 482,992. 40

    Fiscal year ending June 30                        1933                   1934            1935              1936              1937


Cost of new work_ __     _ __             --------------                  $78, 799. 93    $324, 110. 05    $959, 779. 68       $367, 696. 88
Cost of maintenance......_ _           .....      $96, 439. 04             44, 304. 81      61, 376. 14      64, 891. 50         53, 104. 87

        Total cost_..-_
                    ----------                      96, 439. 04           123, 104. 74     385, 486. 19   1, 024, 671. 18       420, 801. 75

Total expended...............-----------------.     93, 118. 94           114, 190. 16     297, 640. 83   1, 037, 651. 79       430, 599. 79

Allotted-                  .---------------------- 112, 911. 98         1, 849, 108. 00   -86, 000. 00       84, 562. 24         75, 000. 00


Balance unexpended July 1, 1936__-- __------------
                                          _        ------------
                                                   _$437,                                                                        395. 57
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936---------------------------------------                                                                  75, 000. 00

      Amount to be accounted for__ ______-______________-       -                                                           512, 395. 57
Gross amount expended-------------------------   $440, 787. 34
Less reimbursements collected-------------          10, 187. 55
                                                                                                                            430, 599. 79
      Balance unexpended June 30, 1937 ___________-----__                                                                    81, 795. 78
Outstanding liabilities June 30, 1937 ___._____   $11, 011.89
Amount covered by uncompleted contracts _________ 68, 995. 94
                                                                                                                             80,007. 83
     Balance available June 30, 1937 ___________________- -_                                                                   1, 787. 95
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937___
                        ------               __-----------164,                                                                   500. 00

           Balance available for fiscal year 1938--------------------                                                       166, 287. 95
Amount (estimated) required to be appropriated for completion
   of existing project 1___________-___                                                                                     280, 000, 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939 :
   For new work 1                                                                                                           280, 000. 00
       For      maintenance 1_____________                                                                   __              75, 000. 00

           Total 1                                -------------------                                                       355, 000. 00
   1 Exclusive of available funds.

3. WATERWAY BETWEEN BEAUFORT, S. C., AND ST. JOHNS RIVER,
    FLA. (BEAUFORT, S. C., TO CUMBERLAND SOUND SECTION)

  Location.-This section of the waterway connects Beaufort, S. C.,
with Fernandina, Fla. (See U. S. Coast and Geodetic Survey Charts
Nos. 838-842.) For Cumberland Sound to St. Johns River section
see page 568.
  Previous projects-Between Savannah, Ga., and Fernandina,
Fla.-Previous improvements in this section were authorized by
River and Harbor Acts of August 2, 1882, August 11, 1888, July 13,
1892, and March 3, 1905.
  Prior to 1913 the cost and expenditures were $194,496.96 for new
work and $134,797.63 for maintenance, a total of $329,294.59. For
scope of previous projects of the inland waterway between Beau-
552         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

fort, S. C., and St. Johns River, Fla., see pages 1814, 1821-1823 of
the Annual Report for 1915.
   Existing project.-This provides for a waterway 12 feet deep, at
mean low water, and not less than 90 feet wide, between Beaufort,
S. C., and Savannah, Ga., via Beaufort River and Port Royal Sound;
and for a waterway 7 feet deep at mean low water and not less than
150 feet wide between Savannah, Ga., and Fernandina, Fla. The
total distance from Beaufort, S. C., to Fernandina, Fla., is 186 miles.
The project also provides for the following: (1) Removing logs
and snags from Generals Cut, Ga., (2) an alternate and more pro-
tected route 7 feet deep at mean low water, from Doboy Sound to
Brunswick Harbor, via Darien River, Three Mile Cut, Altamaha
River, One Mile Cut, Buttermilk Sound, Mackay River, Back River,
Clubb Creek, and Plantation Creek; (3) a protected channel 7 feet
deep at mean low water and 75 feet wide around St. Andrew Sound,
extending from the main route of the waterway in Jekyll Creek
through Jekyll Sound, Little Satilla River, Umbrella Cut, Umbrella
Creek and its south branch, through Dover Cut to Dover Creek,
thence up Dover Creek and through a narrow neck of land to
Satilla River, thence through a land cut south of Todd Creek and
through Floyd Creek to the main route of the waterway in Cumber-
land River; (4) a channel 5 feet deep at mean low water and 50
feet wide to connect Baileys Cut to Satilla River and Dover Creek,
Ga.; (5) a loop 8 feet deep at mean low water to reach the wharves
at the southern end of Cumberland Sound. In general, the work is
to be accomplished by dredging, supplemented by training walls, as
necessary.
   The mean tidal range between Beaufort, S. C., and Fernandina,
Fla., is from 6 to 8 feet, with fluctuations from 11/2 to 2 feet, due to
winds and lunar phases.
   The estimated cost of new work, revised in 1937, is $411,600, exclu-
sive of amounts expended under previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $87,000.
   The River and Harbor Act of August 8, 1917, consolidated into
"Waterway between Beaufort, S. C., and St. Johns River, Fla.", the
three former separate projects as shown below:

                                      River and      H. Doc Con- Ses-
            Section                  Harbor Act       No.   gresssionRemarks
                                     approved--

                                    rJune   3,1896    1295    53     3    Route no. 2 adopted.
Inland waterway between Sa-         Mar.    3,1899     295    53     3    Route no. 1 adopted.
vannah, Ga., and Beaufort,         July 25,1912      1513    62     2    Modification of route no. 2 pro-
S. C.                                                                      vided for Archer Creek.3
                                    Mar. 3,1925       2178    68     2    Fixes the minimum width at 75
                                                                            feet.
          a Fernandina,
Waterway between
          and     Savannah,
                      Fla.          July 13,1892
                                    Mar.  3,1905         41
                                                      1 450   52
                                                              58     21   Original 7-foot
                                                                          Provided        channel.
                                                                                    for Skidaway   Narrows.
Ga., and Fernandina, Fla.          July 25,1912      11236   60      2   Incorporated alternate routes pre-
                                                                            viously improved as separate
                                                                            projects and the auxiliary chan-
                                                                            nels.
Channel   between     St.   Johns   Mar.    4,1913      898   62     2    No map published.
River   and    Cumberland
Sound, Ga. and Fla.

1These documents contain published maps.
SSenate document.
 * Main route via Beaufort River and Port Royal Sound instead of via Archer Creek (H. Doc. No. 6, 75th
Cong., 1st sess.).
                  RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                                         553

   The River and Harbor Act of March 2, 1919, provided for work in
Generals Cut (H. Doc. No. 581, 63d Cong., 2d sess.) and in Back-
River (H. Doc. No. 1391, 62d Cong., 3d sess.) ; the River and Harbor
Act of July 3, 1930, provides for a channel from Baileys Cut to
Dover Creek (S. Doc. No. 43, 71st Cong., 2d sess.), and the River
and Harbor Act of August 26, 1937, provided for a 7-foot protected
channel around St. Andrews Sound (Senate Committee Print, 74th
Cong., 1st sess.), and for a 12-foot channel between Beaufort, S. C.,
and Savannah, Ga. (Rivers and Harbors Committee Doc. No. 6,
75th Cong., 1st sess.). The first three documents and the committee
print contain the latest published maps.
   Local cooperation.-The River and Harbor Act of August 26,
1937, imposes the conditions that local interests shall furnish free
of cost to the United States: (1) All lands or easements needed for
the 7-foot protected channel around St. Andrews Sound and (2)
all necessary rights-of-way and spoil-disposal areas for new work
and subsequent maintenance of the 12-foot channel between Beaufort,
S. C., and Savannah, Ga. These conditions have not been met, but it
is expected that they will be fulfilled before funds are allotted for
this work.
   All other local cooperation has been fully complied with.
   Terminal facilities.-Exclusive of terminal facilities at the ports
of entry, this improvement serves numerous wharves, some of which
are open to the public on equal terms. These facilities are con-
sidered ample for existing water-borne commerce.
   Operations and results during fiscal year.-Maintenance dredging
with the U. S. dredge Creighton was in progress during the entire
fiscal year and resulted in the removal of 1,353,473 cubic yards be-
tween Beaufort, S. C., and Cumberland Sound, Ga., at a cost of
$120,540. The total expenditure for the year was $119,598.21
charged to maintenance.
   Condition at end of fiscal year.-The project is 55 percent com-
pleted. The work remaining to be done consists of deepening the
channel to 12 feet at mean low water for a width of not less than 90
feet between Beaufort, S. C., and Savannah, Ga.; and of dredging a
protected channel around St. Andrews Sound to be 7 feet deep at
mean low water and 75 feet wide. All other improvements were
completed in 1932. The improvement cuts have considerably short-
ened the original length of this waterway. The training walls and
closure dams were completed in 1912 and are in satisfactory condition.
   The main route and alternate routes had project depth at the end
of the fiscal year except in the following localities:

                                           Locality                                                     Project    Corol- Date deter-
                                                                                                         depth      depthling mined
                                                                                                                   depth

Main route:                                                                                              Feet       Feet
     Ramshorn Creek...--...........------------------------....................-------......---------      12.0        9. 5   October 1936.
     Walls Cut...........--            ...--------------- ------------------------------                   12.0        8. 5   March 1936.
     Fields Cut..............------------------         ----------              --------                   12.0        8.4    August 1937.
     South Channel.........----------------------------------------------                                   7.0        6.2    July 1937.
Auxiliary routes:
   Back River (north end)................................--------------------------........7.0                         5.4    June 1937.
                 ------------
     Generals Cut...                             -------------------            --------------              3.         2. 9   July 1937.
Protected route around St. Andrews Sound:
    Dover Cut--_      ..- ------------------------     *      .7.                       ------                0       5. 5    June 1937.
    Umbrella Creek..............................-------------------------------..............               7. O      4. 2       Do.
    Todd Creek .........-------------------------------------------                                         7.0       2.2        Do.
554                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The costs have been $228,555.12 for new work and $1,259,603.27
for maintenance, a total of $1,488,158.39. The total expenditures
have been $1,477,587.43.
  Proposed operations.-The balance unexpended July 1, 1937
($12,481.12), together with allotments of $80,000 made during July
1937, or a total of $92,481.12, will be applied as follows:
Accounts payable July 1, 1937___-- __-------         _
Maintenance: Dredging with U. S. dredge Creighton, between Beau-
                                                                ______-- $10, 570.96                                          _____
fort, S. C., and Cumberland Sound, 8 months, between July 1,
1937, and June 30, 1938___         ---------------------------           81, 910. 16

              Total ----------                                --------------- ----------                                 ---------             92, 481. 12
  The additional sum of $263,000 can be profitably expended during
the fiscal year 1939, as follows:
New work:
   Dredging, by contract, between Beaufort, S. C., and Savannah,
     Ga., between July 1, 1938, and June 30, 1939___ -__----     $80, 009.00
   Dredging, by contract, protected route around St. Andrews
     Sound, between July 1, 1938, and June 30, 1939---------- 103,000. 00

       Total for new work--____----          __-____-_          183, 00.00
Maintenance: Dredging with U. S. pipe-line dredge Creighton be-
tween Beaufort, S. C., and Cumberland Sound, 8 months, between
July 1, 1938, and June 30, 1939-----------_____---------------  80, 000. 00

              Total for all work_                               -----               ___-_--
                                                                                        -                  -          __              -_ 263, 000.00

                                                        Cost and financial summary
Cost of new work to June 30, 1937_________                                                           ____ __   ____ $423, 052. 08
Cost of maintenance to June 30, 1937__-___----                                                       -   _______  _ 1, 394, 400. 90
     Total cost of permanent work to June 30, 1937-----------1, 817, 452.98
Minus accounts payable June 30, 1937-------------------          10, 570. 96
     Net total expenditures -----------------                                                                      -__--_              1, 806, 882. 02
Unexpended balance June 30, 1937----------------------                                                                                     12, 481.12
              Total amount appropriated to June 30, 1937 ------------ 1, 819, 363.14

             Fiscal year ending June 30                                           1933        1934                1935             1936            1937


Cost of new work ...                .      .       .      .         .
Cost of maintenance                 -------.............--.......           $51, 535. 28   $63, 530.77         $64, 003. 44     $81, 404.96     $120, 540. 00
                         -_
Total expended....................                                      .    37, 429.
                                                                                    22      56,135.
                                                                                                  70            64,  44
                                                                                                                  003.             775. 79
                                                                                                                                 71,                598.
                                                                                                                                                 119,  21
Allotted.-........-.--....--.--..              -.----                        39, 272. 50   107, 722. 64         76, 000. 00      78, 000. 00      55, 000. 00


Balance unexpended July 1, 1936                                               _              -----------                                  $77, 079. 33
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------------------                                                                                  55, 000. 00

      Amount to be accounted for------------------------------ 132, 079. 33
Gross amount expended----------------------------------------119, 598.21

      Balance unexpended June 30, 1937_- -      -      __------12,                                                                                481. 12
Outstanding liabilities June 30, 1937_ __________-------10,                                                                                       570. 96
    Balance available June 30, 1937                                                                                                             1, 910. 16
Amount allotted during July 1937_---_---------_                                                                                                80, 000. 00

              Balance available for fiscal year 1938,                                             -------------                                81,910. 16
            RIVERS AND HARBORS-SAVANNAH, GA., DISTRI'CT                  555
Amount (estimated) required to be appropriated for completion
of existing project 1-----------------------       -------      $183, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work        ---------------------------------------    183,000.00
   For maintenance ------------------------------------            80, 000. 00

       Total 1             -------------------                    263, 000. 00
1 Exclusive of available funds.

           4. ALTAMAHA, OCONEE, AND OCMULGEE RIVERS, GA.

   Location.-These rivers are located entirely within the State of
Georgia. (See U. S. Geological Survey map of Georgia.) For full
description of these rivers see page 636, Annual Report for 1932.
   Previous projects.-Prior to the present one, projects had been
adopted and expenditures made under them for the Altamaha River
by River and Harbor Acts of March 3, 1881, and September 19,
1890; for the Oconee River by River and Harbor Acts of June 18,
1878, September 19, 1890, and March 3, 1905, and for the Ocmulgee
River, August 14, 1876, and September 19, 1890.
   Cost and expenditures were $760,610.26 for new work and $111,-
950.32 for maintenance, a total of $872,560.58.
   For further details see page 1815 of Annual Report for 1915.
   Existing project.-This contemplates an appropriation of $40,000
per year for the Altamaha, Oconee, and Ocmulgee Rivers, to be
applied, following in general the methods which had been carried
on under the previous projects-, to maintenance of 3 feet depth dur-
ing ordinary summer low water and to the gradual increase of chan-
nel depth, so far as practicable, without sacrificing the maintenance
work. These methods are the removal of rock shoals, snags, over-
hanging trees, and other obstructions; the closing of incipient cut-
offs; the revetting of caving banks; and the use of spur dikes and
training walls. The width of channel was not specified, but it
should vary from 60 to 100 feet, according to locality. This project
includes the entire Altamaha River, with a length of 137 miles, the
lower 145 miles of the Oconee River, and the lower 205 miles of the
Ocmulgee River. The Altamaha River has a mean tidal range of
6.4 feet at its mouth, which gradually decreases to mile 33 above,
where there is no perceptible tidal effect. At Doctortown, mile 59,
ordinary floods attain a height of about 10 feet above low water, and
extreme floods a height of about 16 feet above low water.
   On the Oconee River at Dublin the ordinary fluctuations attain
a height of 22 feet and the extreme fluctuations a height of 32 feet
above low water. On the Ocmulgee River at Macon the ordinary
fluctuations attain a height of 15 feet and the extreme fluctuations a
height of 25 feet above low water. There is no approved estimated
cost for improvement or for maintenance.
   The existing project was adopted by the River and Harbor Act
of July 25, 1912 (H. Doc. No. 443, 62d Cong., 2d sess.). The latest
published maps of these rivers are in the following documents:
Altamaha River, House Executive Document No. 283, Fifty-first
Congress, second session; Oconee River, House Executive Document
No. 211, Fifty-first Congress, first session; and Ocmulgee River, House
Executive Document No. 215, Fifty-first Congress, first session.
556      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Terminal facilities.-Transfer of freight between the railways and
the river is practicable at Doctortown, Dublin, Hawkinsville, and
Abbeville. The facilities are considered ample for existing commerce.
    Operations and results during fiscal year.-The U. S. snag boats
No. 1 and No. 2 operated periodically on the Altamaha River from
its mouth to the forks, 137 miles, on the Oconee River from mile 0 to
mile 88, and on the Ocmulgee River from mile 0 to mile 96, removing
4,379 obstructions with hired labor, at a cost of $17,341.66, which re-
sulted in clearing these rivers of the worst obstructions. The total
cost was $17,341.66, all for maintenance. The total expenditures
were $20,284.44.
   Condition at end of fiscal year.-The existing project is of such a
nature that the percentage of completion cannot be stated. Channel
depths have been increased by the excavation of rock shoals and sand
bars, by the construction of contraction and bank-protection works,
and by the closing of cut-offs. Navigation has been rendered safer
by removal of obstructions. Many of the closing dams and contrac-
tion and bank-protection works need repairs. The controlling depths
at ordinary summer low water were about 2.4 feet for the Altamaha
River, 3.0 feet from the mouth of the Oconee River to Dublin, Ga.,
and 1 foot from Dublin to Milledgeville, Ga., and 2.2 feet from the
mouth of the Ocmulgee River to Abbeville, Ga., mile 96, and 1 foot
from Abbeville to Macon, Ga. These depths are practicable through-
out the year, except during October and November, the usual low-
water months. The costs have been $60,847.16 for new work and
$678,622.62 for maintenance, a total of $739,469.78. The total ex-
penditures were $738,137.89.
   Proposed operations.-The balance unexpended July 1, 1937
6($2,425.52), together with allotments of $24,000 made during July
1937, or a total of $26,425.52, will be applied as follows:
.Accounts payable July 1, 1937 __________________---------_         _ $1, 331.89
1Miintenance:
    Snagging with U. S. snagboat No. 1 on upper part of
       the Oconee and Ocmulgee Rivers, 6 months, be-
       tween July 1 and Nov. 30, 1937, and between Apr. 1
       and June 30, 1938-------------------------------   $9, 000. 00
    Snagging with U. S. snagboat No. 2 on the Altamaha
       and lower portions of the Oconee and Ocmulgee
       Rivers, 41/2 months, between July 1 and Oct. 31,
       1937, and between Apr. 1 and June 30, 1938-------- 16, 093. 63
                                                                        25, 093. 63
        Total for all work--------------------------------------        26, 425. 52
  The additional sum of $28,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance:
    Snagging with U. S. snagboat No. 1 on upper parts of the Oconee
      and Ocmulgee Rivers, 7 months__------------------------------ $10, 500
    Snagging with U. S. snagboat No. 2 on the Altamaha and lower
      portions of the Oconee and Ocmulgee Rivers, 5 months---------  17, 500

         Total----------------------------      ------       -------       28, 000
                       RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                             557
                                                          Cost and financial summary
Cost of new work to June 30, 1937_______________------------$821,   457. 42
Cost of maintenance to June 30, 1937                                572. 94
                                        .___________--------------790,
     Total cost of permanent work to June 30, 1937__ ....-..                                                      1, 612, 030. 36
Minus accounts payable June 30, 1937______-------   -----                                                              1,331. 89

     Net total expenditures                                                                                        , 610, 698. 47
                                                                                                                  1---------------------------------
Unexpended balance June 30, 1937----------------------------                                                            2,425. 52

               Total amount appropriated to June 30, 1937--------------                                           1, 613, 123.99

      Fiscal year ending June 30                             1933            1934          1935           1936             1937


Cost of new work-... .      ---
Cost of maintenance-----------
                  ............ $20,880. 28                                $32, 396. 40   $19,053. 16    $12, 953. 33      $17, 341.66
Total expended------------------                             6, 625. 63   -48, 571. 61    22, 089. 99    10, 463. 09       20, 284. 44

Allotted--------............--------------............      10, 621. 14   -18, 941. 57    17, 000. 00     -500. 00


Balance unexpended July 1, 1936__ ---------------------------                                                          $22, 709. 96
Gross amount expended_------- ---     ------------------                                                                20, 284. 44

      Balance unexpended June 30, 1937_-____-___---_____                                                                 2, 425. 52
Outstanding liabilities June 30, 1937__-- __-_______-----                                                                1,331. 89
      Balance available June 30, 1937________-----                                                                       1,093. 63
Amount allotted during July                                   1.937__--___________--------------                       24, 000. 00
     Balance available for fiscal year 1938- ----------------                                                           25, 093. 63
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1                                                                                            28, 000. 00
     1 Exclusive of available funds.

                                                         5. BRUNSWICK HARBOR, GA.

    Location.-The harbor entrance is 70 statute miles south of en-
trance to Savannah Harbor, Ga., and 25 statute miles north of
entrance to Fernandina Harbor, Fla. (See U. S. Coast and Geo-
detic Survey Chart No. 447.)
    Previous projects.-Adopted by River and Harbor acts of July 4,
1836; August 5, 1886; June 3, 1896: and June 13, 1902. The cost and
expenditures prior to 1907 were $643,465.18 for new work and $54,-
414.07 for maintenance, a total of $697,879.25. (For further details
see page 1818 of Annual Report for 1915.)
       Existing project.-This provides for channels, as follows:
    30 feet deep and 500 feet wide through the bar;
    27 feet deep and 400 feet wide at Brunswick Point;
    27 feet deep and 350 feet wide in East River;
    27 feet deep and 300 feet wide in Turtle River;
    24 feet deep and 150 feet wide in Academy Creek; and
    A cut from Academy Creek to Turtle River, if later decided advisable.
    A channel in Back River 20 feet deep and 150 feet wide from St. Simons
  Sound to the mouth of Mill Creek.
   All depths referred to are mean low water. The mean tidal range
on the bar is 6.5 feet, at the city of Brunswick 7.3 feet, and at the
upper end of the harbor 7.6 feet, with minor fluctuations due to wind
and lunar effects.
 558       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    The estimated cost of new work, revised in 1930 (exclusive of
  amounts expended on previous projects), is $2,403,700, including
  $10,000 contributed by local interests. The latest (1930) approved
  estimate for annual cost of maintenance is $154,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1879, provided for the construction
of East River jetty (Annual Report for 1880, p. 959); act of March
2, 1907, provided for channels in the inner and outer harbors
of 30 feet depth at mean high water, with widths varying from 150
feet in Academy Creek to 400 feet across the outer bar; the exten-
sion of training wall in East River; and the construction of two
spur dikes (H. Doc. No. 407, 59th Cong., 1st sess.); act.of March 2,
1919, provided for increased widths and depths in the existing
channel (H. Doc. No. 393, 64th Cong., 1st sess.); and the act of July
3, 1930, provides for a 20-foot channel in Back River and increased
depths on the bar, Brunswick Point, Turtle River, and East River
 (S. Docs. Nos. 57 and 132, 71st Cong., 2d sess.). The two last-
mentioned documents contain the latest published maps.
    Local cooperation.-Fully complied with.
    Terminal facilities.-This improvement serves a developed water
front of about 2 miles, including 2,377 feet of wharf frontage on
Turtle River.
    The city of Brunswick owns and maintains one small municipal
wharf, 900 linear feet of undeveloped frontage, and the foot of all
city streets, though it controls only two of them, the rest having
been leased to individuals or corporations. These facilities are
considered ample for existing commerce.      (For further details see
Port Series No. 10, Corps of Engineers, revised 1935.)
    Operations and results during fiscal year.-Improvement dredging
by Government plant and hired labor, operating in the outer harbor,
resulted in the removal of 86,370 cubic yards of material, at a cost
of $10,941.15. Maintenance dredging by Government plant and
hired labor, operating on the inner harbor, resulted in the removal of
277,526 cubic yards of material, at a cost of $43,133.55. Total costs
were $54,074.70, of which $10,941.15 was for new work and $43,133.55
was for maintenance. The total expenditures were $66,323.95.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936, at a saving of $195,918 under the estimated cost. The
East River training wall and spur dike are in good condition. The
controlling depths at mean low water, as determined in June 1937,
were for Brunswick Bar, 27.4 feet over a width of 150 feet; upper
Turtle River, 29.5 feet over a width of 200 1 feet; lower Turtle
River, 28.8 feet over a width of 150 1 feet; Brunswick. Point, 27.0
feet over a width of 300 1 feet; Brunswick River, 25.4 1 feet for a
width of 300 feet; East River, 26.6 feet over a width of 100 feet;
Academy Creek, 11.5.feet over a width of 150 1 feet; and Back River,
9.8 feet over a width of 150 1 feet. Upper and lower Turtle River
and Back River were completed in 1931. Brunswick Point and East
River were completed in 1932. Brunswick Bar was completed in
1936. Academy Creek was completed in 1926.
   With regular funds the costs have been $2,100,260.87 for new work
and $1,655,430.34 for maintenance, a total of $3,755,691.21. The ex-
penditures were $3,766,574.03.
1 800 yards eastward of the intersection of Lower Turtle River range and Brunswick
Harbor range.
                     RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                                     559
  With Public Works funds the costs have been $97,520.95 for new
work and $4,995.08 for maintenance, a total of $102,516.03. The ex-
penditures were $102,516.03.
  The total costs, United States funds, have been $2,197,781.82 for
new work and $1,660,425.42 for maintenance, a total of $3,858,207.24.
The total expenditures were $3,869,090.06. The total cost and ex-
penditures from contributed funds were $10,000 for new work.
  Proposed operations.-An allotment of $100,000 made during July
1937 will be applied as follows:
Maintenance :
   Dredging outer harbor with United States hopper dredge, 1/
      months, between Jan. 1 arid June 30, 1938---------------------$35, 000
   Dredging inner harbor with United States pipe-line dredge, 1
      month, between Jan. 1, and June 30, 1938__-------------------   25, 000
   Balance available------------------------------------ ---          40, 000

                 Total for all work---_------------------------------ -100,                                                            000
  The additional sum of $110,000 can be profitably expended during
the fiscal year 1939, in maintenance dredging of outer and inner har-
bors with United States hopper dredge, 4 months, between July 1,
1938, and June 30, 1939.
                                                            Cost and financial summary

Cost of new work to June 30, 1937----------------------------                                                     1$2, 841, 247.00
Cost of maintenance to June 30, 1937--------------------------                                                      1, 714, 839. 49

      Total cost of permanent work to June 30, 1937-----------                                                       24,   556, 086. 49
Undistributed costs June 30, 1937----------------------------                                                               10, 882. 82

        Net total cost to June 30, 1937 ----------------------- 4, 566, 969. 31
Net total expenditures -------------------------------        - 1 2 4, 566, 969. 31
Total amount appropriated to June 30, 1937-----------------     12 4, 566, 969. 31

     Fiscal year ending June 30                                1933            1934           1935           1936-              1937


Cost of new work__-............                        --      _--........   $47, 749. 68   $49, 771. 27   $43, 405. 50        $10, 941. 15
Cost of maintenance-- ......-- -                             $90, 648. 57     94, 769. 20    18, 045.20    109, 644. 12         43, 133. 55
        Total cost-----------------.................          90, 648. 57    142, 518. 88    67, 816. 47   153, 049. 62         54, 074. 70
Total expended---------------...............                  89, 890. 21    123, 686. 66   88, 029. 78    151, 683. 19         66, 323. 95
Allotted..----------------------                              87, 095. 75    290, 088. 05   85, 012. 34    245, 000. 00      -110, 992. 86


Balance unexpended July 1, 1936___--------------------------_                                                          $183. 316. 81
Deductions on account of revocation of allotment--------------                                                             116, 992. 86

      Net amount to be accounted for _______________________                                                                66, 323. 95
Gross amount expended--------------------------------------                                                                 66, 323.95
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937             -        ----------                                                                     00, 000. 00.
                                                                                                                           1------
Balance available for fiscal year 1938-------------------------                                                            100, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance "------------------------_--_                                                              110, 000. 00
    1 Exclusive of $10000 contributed funds.
     SIncludes $102,516.03 Public Works funds.
    SExclusive of available funds.
        20196 37-pt. 1--36
560      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                       6. SATILLA RIVER, GA.

    Location.-This river has its headwaters in southern and south-
  eastern Georgia, flows in a generally southeasterly direction, and
  empties into the Atlantic Ocean through St. Andrew Sound. (See
U. S. Geological Survey map of Georgia.)
    Existing project.-This provides for the removal of snags and
similar obstructions from the mouth to Burnt Fort, a distance of 52
miles, and the removal of obstructions and the closing of incipient
cut-offs from Burnt Fort to Waycross, a distance of 114 miles. The
mean tidal range is 6.6 feet at the mouth and 3.2 feet at Burnt Fort,
with minor fluctuations due to wind and lunar effects. The freshet
variation at Waycross is about 12 feet.
    The original and latest approved estimate of cost, made in 1912,
was $20,000, divided equally between the two portions of the river.
The latest (1928) approved estimate for annual cost of maintenance
is $2,000.
    The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for the improvement
of the river from the mouth to Burnt Fort (H. Doc., No. 41, 62d
Cong., 1st sess.) ; act of March 4, 1913, provided for the improvement
of the river from Burnt Fort to Waycross (H. Doc. No. 1113, 62d
Cong., 3d sess.). The latest published map of the lower section is
the United States Coast and Geodetic Survey Chart No. 450, and
that of the second or upper section will be found in House Document
No. 1113, Sixty-second Congress, third session.
    Terminal facilities.-This improvement serves five main loading
points at which are small wharves. These facilities are considered
sufficient for existing commerce.
    Operations and results during fiscal year.-U. S. snagboat No. I
operated on maintenance snagging between mile 26 and mile 63 from
December 21, 1936, to March 8, 1937, removing 1,700 obstructions,
with hired labor, at a cost of $4,000. The total cost and expendi-
tures were $4,000, all for maintenance.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1914 at a saving of $10,548 under the estimated cost. The
controlling depths in July 1937, as determined from reports of pilots
using the river, were as follows: The mouth to Owens Ferry, 9 feet;
Owens Ferry to Burnt Fort, 3.5 feet; thence to Waycross, the head
of navigation, about 1 foot. These depths are at ordinary summer
low water except from the mouth to Owens Ferry, where the depth
refers to mean low water. These depths are practicable throughout
the year.
    The costs and expenditures have been $9,451.59 for new work and
 $30,059.55 for maintenance, a total of $39,511.14.
    Proposed operations.-No funds are available and no work is con-
•templated during the fiscal year 1938.
    The sum of $3,000 can be profitably expended during the fiscal
year 1939 in snagging with U. S. snagboat No. 1, 2 months between
December 1, 1938 and March 31, 1939.
                RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                     561
                                    Cost and financial summary

Cost of new work to June 30, 1937------------------------------                                          $9, 451. 59
Cost of maintenance to June 30, 1937----------------------------                                         30, 059. 55

           Total cost of permanent work to June 30, 1937 _______                                         39. 511. 14
Net total expenditures___________________---                                                             39, 511. 14
Total amount appropriated to June 30, 1937-----------------------                                        39, 511. 14

           Fiscal year ending June 30              1933           1934           1935         1936           1937

Cost of new work.. .......--------                                         -- --------       ------
Cost of maintenance..-------------------         $2, 985.74   ----------            .
                                                                               -------   ------------          $4,000
Total expended---.....-----......----------------2,985. 74-----------------------------------4, 000
Allotted    -_------   -----------------------    2, 311. 14 ------------------------          $3, 000          1,000


Balance unexpended July 1, 1936_------------------------------- $3, 000. 00
Amount allotted from War Department Appropriation Act approved
  May 15, 1936__---------------------------------------------- 1, 000. 00

      Amount to be accounted for--------------------------------4, 000. 00
Gross amount expended _______--___-__       -       -      -_______4, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ________      ___________________                                              3, 000.00

                            7. ST. MARYS RIVER, GA. AND FLA.

   Location.-This river has its source in the Okefenokee Swamp and
flows, first in a southeasterly direction, and then due north, thence in
a southeasterly direction, and empties into Cumberland Sound about
3 miles north of Ferandina, Fla.          (See U. S. Geological Survey
map of Georgia.)
   Existing project.-This provides for a channel 17 feet deep at
mean low water with a width of 200 feet from the mouth to Crandall,
12.5 miles, and for clearing the channel of snags to Kings Ferry,
37 miles above the mouth, and as much farther as may be practicable
for a sum of $5,000. The upper limit reached by this expenditure
was Traders Hill. 59 miles above the mouth. The mean tidal ranges
are as follows: At the mouth, 5.8 feet; at the Atlantic Coast Line
Railway bridge, 55 miles above the mouth, 1.4 feet, with minor fluc-
tuations due to wind and lunar effects. Freshet fluctuations on the
upper portions are about 10 feet.
   The original and latest approved estimate of cost of new work,
made in 1912, was $19,450. The latest (1915) approved estimate of
cost for annual maintenance is $2,500.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 697, 62d Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-The city of St. Marys owns and maintains a
wharf of 50 feet frontage. There is a private wharf having a dock-
ing space of 200 feet on the city water front and two private
wharves having a total docking space of 340 feet on North River.
These facilities are considered ample for existing water-borne
commerce.
  562                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Recommended modiifcations of project. Reduction of project
  depth from 17 feet to 14 feet from St. Marys to Crandall is recom-
  mended in House Document No. 467, Sixty-ninth Congress, first
  session.
     Operations and results during fiscal year.-U. S. snagboat No. 1
  operated on maintenance snagging between mile 8 and mile 61, from
  March 9 to April 17, 1937, removing 830 obstructions with hired
  labor, at a cost of $2,000. The total cost and expenditures were
 $2,000, all for maintenance.
    Condition at end of fiscal year.-The existing project was com-
  pleted in 1914 at a saving of $3,762 under the estimated cost. The
controlling depths at mean low water, as determined in June 1937
  from reports of steamboat pilots, were as follows: The mouth to St.
Marys (ascertained in July 1937), 15.4 feet; St. Marys to Kings
Ferry, 11 feet; Kings Ferry to the Atlantic Coast Line Railroad
bridge, mile 55, 6 feet; and Atlantic Coast Line bridge to Traders
Hill, mile 59 (the head of navigation), 4 feet. These depths are
practicable throughout the year. The costs and expenditures have
been $15,688.36 for new work and $49,136.44 for maintenance, a total
of $64.824.80.
    Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1938.
    The sum of $3,000 can be profitably expended during the fiscal year
1.939 in snagging with U. S. snagboat No. 1, 2 months between Decem-
ber 1, 1938, and March 31, 1939.
                                                   Cost and financial summary

Cost of new work to June 30, 1937------------------------------                                                            $15, 688. 36
Cost of maintenance to June 30, 1937 -----------------------_                                                               49, 136. 44

      Total cost of permanent work to June 30, 1937 _______ ___-64, 824. 80
Net total expenditures------------ ----     ------------------- 64, 824. 80
Total amount appropriated to June 30, 1937-----. --------------- 64, 824. 80

            Fiscal year ending June 30                          1933            1934              1935             1936            1937


Cost of new work--
Cost of maintenance-- .
                                                                                                             ---------....------- $2, 000
                                        --------------...............................------------------ -....---...------
                                                ......-----------------$2, 560. 34 ----------- ------------.------------

Total expended..........-----...--.......--------------..     2, 624. 80 ..----------------------------------...............          2, 000
Allotted................------------------- ----------        2, 074. 80 ------------               .....------------$3, 000        -1, 000


Balance unexpended July 1, 1936 ..--------------------------------                                                             $3, 000. 00
Deductions on account of revocation of allotment-----------------                                                               1, 000. 00

       Net amount to be accounted for   --     ------------       2, 000. 00
Gross amount expended------ -------                               2, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance---------------------------------3, 000. 00
                                          8. FERNANDINA HARBOR, FLA.

  Location.-The harbor entrance is 221/2 statute miles north of the
entrance to Jacksonville Harbor, Fla., and 95 statute miles south of
the entrance to Savannah Harbor, Ga, (See U. S. Coast and Geo-
detic Survey Chart No. 453.)
          RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                563
    Existing project.-This provided originally for a 19-foot channel
over the outer bar at mean low water by means of two jetties, sup-
plemented by dredging. The jetties are constructed of stone, the
north jetty being 19,150 feet long and the south jetty 11,200 feet long.
As a result of the construction of the jetties, a channel 26 feet deep
was obtained over the outer bar, and the project as it now exists
provides for the extension of this 26-foot channel to the south end
of the Florida Terminal Co. development, 400 feet wide up to Cal-
houn Street and 300 feet above that point. The length of the section
included in the project is 7 miles. The mean tidal range on the bar
is 5.8 feet and in the inner harbor 6 feet, with minor fluctuations due
to wind and lunar effects.
    The estimated cost of new work, revised in 1925, was $3,196,400.
The latest (1925) approved estimate of annual cost of maintenance
is $12,500.
    The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for entrance jetties
  (Annual Report for 1879, p. 792); act of July 13, 1892, provided
for the 19-foot depth (Annual Reports for 1891, pp. 1565-1598; for
1896, p. 1289); act of March 2, 1907, provided for the improve-
ment of the inner harbor (H. Doc. No. 388, 59th Cong., 1st sess.) ;
act of June 25, 1910, provided for the combination of the improve-
ment of Fernandina Harbor and Cumberland Sound under the gen-
eral heading of Fernandina Harbor; and act of March 3, 1925,
provided for the 26-foot channel (H. Doc. No. 227, 68th Cong., 1st
sess.). The last-mentioned document contains the latest published
map.
    Terminal facilities.-There is a total of 4,360 linear feet of wharf
frontage located along the 2 miles of water front. The present facili-
ties are considered ample for existing commerce. (For further details
see Port Series No. 8, Corps of Engineers.)
    Operations and results during fiscal year.-U. S. Hopper Dredge
Culebra operated on maintenance dredging from April 19 to May 7,
1937, removing 302,569 cubic yards at a cost of $20,000. The total
cost and expenditures during the year were $20,000, all for main-
tenance.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1927 at a saving of $7,508 under the estimated cost. The
construction of two stone jetties, supplemented by dredging on the
outer bar, was completed in 1905. Most of the spur dikes are in
good condition, but the jetties need repairs. The controlling depths
at mean low water, as determined in May 1937, were as follows: In
the inner harbor, 25.5 feet; through the outer harbor, 30.3 feet.
    The costs and expenditures have been $3,188,892.15 for new work
and $748,085.28 for maintenance, a total of $3,936.977.43.
    Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
    The sum of $276,000 can be profitably expended during the fiscal
year ending June 30, 1939, in repairs to jetties, by contract, between
July 1, 1938, and June 30, 1939.
564                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                    Cost and financial summary
Cost of new work to June 30, 1937------------------------$3,   188, 892. 15
Cost of maintenance to June 30, 1937 ------        -___-___---___
                                                               748, 085. 28
      Total cost of permanent work to June 30, 1937--------                                                                   3, 936, 977. 43
Net total expenditures------         ---------------                                                                          3, 936, 977. 43
Total amount appropriated to June 30, 1937-----------------                                                                   3, 936, 977. 43

             Fiscal year ending June 30                                  1933            1934              1935           1936          1937


Cost of new work.......
Cost of maintenance                    ------------------------
                                           ___                  ----------------------                                 ------------ $20, 000
Total expended.......------------- -------                          --------- -----    ------........... ----------- ------------           20, 000
Allotted                                                                $777.74-----------------------------------
                                                                                                  ----------------------------- 20, 000


Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936----------------------------------------                                                                    $20, 000. 00
Gross amount expended------- --------------------------------                                                                     20, 000. 00
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance _____......    ____    __    _---                                                               276, 000. 00

      9. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year amounted to $24,582.77; the
expenditures were $24,460.58. The balance unexpended June 30, 1937,
$1,301.64, plus $25,000 allotted during July 1937, will be applied as
needed during the fiscal year 1938 to payment of expenses incurred
under this heading. The additional sum of $25,000 can be profitably
expended during the fiscal year ending June 30, 1939.
                                                    Cost and financial summary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937 ---                                                   -                         946. 17
                                                                                                      -_______-___$210,

      Total cost of permanent work to June 30, 1937----------_                                                                   210, 946. 17
Minus accounts payable June 30, 1937-----------               __--                                                                    824. 16

      Net total expenditures-__------ -----                                                                                      210, 122. 01
Unexpended balance June 30, 1937----------------                                                      ---------------              1, 301.64

             Total amount appropriated to June 30, 1937-----                                                           -
                                                                                                                      __--       211, 423. 65

            Fiscal year ending June 30                                   1933            1934             1935            1936          1937

Cost of new work .--------------...                                    I                        --i     ---------        -------
                                                                                                                              _-       --
Cost of maintenance------------------                                $33, 943. 96     $15, 681. 14     $37, 036. 83   $17, 938. 76    $24, 52. 77

Total expended....----------------------34, 552. 94                                    15, 912. 24      32, 958. 45    23, 302. 80     24, 460. 58
Allotted.............................----------------------------     39, 402. 47      25, 521. 18      37, 000. 00    25, 000. 00


Balance unexpended July 1, 1936____                                                                                              $25, 762. 22
Gross amount expended-------------------------------------                                                                        24, 460. 58

      Balance unexpended June 30, 1937                                                                                                 301. 64
                                                                                                                                     1______________-------
Outstanding liabilities June 30, 1937__-- ________---------------                                                                      824. 16
             Balance available June 30, 1937                                                                                           477. 48
                RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                                         565
Amount allotted during July 1937-----------------------------                                                          $25, 000. 00

      Balance available for fiscal year 1938--------------------                                                        25, 477. 48
Amount that can be profitably expended in fiscal year ending         June
                              1 - ---      -- - -- -- -- -- - -- -- -- - -
30, 1939, for maintenance ___      __                                                                                   25, 000.00
SExclusive of available funds.
10. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                        [Commercial statistics for these projects are given in pt. 2 of report]

                                                                      For last     Cost and expenditures to              Estimated
                                                                    full report          June 30, 1937                   amount re-
                      Name of project                                 see An-                                            quired to
                                                                     nual Re-c
                                                                     port for-     New work         Maintenance          complete


1. Savannah River at Augusta, Ga.'1 _-----------   1929                           2 $200, 556. 30     $17, 443. 70           (3)
2. Savannah River above Augusta, Ga...-----------  1929                               69, 599. 99       5, 870.   01         (4)
3. Sapelo Harbor, Ga._-------------------------1929                                   17, 905. 73      17, 094.   27         (3)
4. Darien Harbor, Ga.------------------------      1929                            6 199, 722. 65      42, 343.   28         (3)
5. Fancy Bluff Creek, Ga.---------------------     1935                                8, 000. 00       4, 200.   00         (3)

  1 Project recommended for abandonment in H. Doc. No. 467, 69th Cong., 1st sess.
  2 In addition $185,000 was expended from contributed funds; $172,150.72 for new work and $12,849.28 for
maintenance.
  3 Completed.
  4 About 84 percent completed. Owing to construction of 2 power dams, which have submerged much of
the work under the present and former projects, this improvement cannot be completed as originally planned.
  5Channel adequate for commerce.
  6 Includes $54,929.44 expended on Doboy bar.

             11. PLANT ALLOTMENT FOR SAVANNAH, GA., DISTRICT

                                               Cost and financial summary
Undistributed costs June 30, 1937--------------------                                                           $1, 031, 952.41
Plus accounts receivable June 30, 1937------------- ----------                                                       99, 322. 71

     Gross total costs to June 30, 1937---------------      --                                                    1, 131, 275. 12
Minus accounts payable June 30, 1937----------------------- ---                                                       32, 803. 13

     Net total expenditures                                                                                          098, 471. 99
                                                                                                                  1---------------------------------,
Unexpended balance June 30, 1937---------------------------                                                          -7, 237. 28

           Total amount appropriated to June 30, 1937--------------                                               1, 091, 234. 71

     Fiscal year ending June 30                           1933      1934             1935                1936                1937


Total expended__......_-        ______...                                       $1, 260, 332. 35
                                                                 .___________------------           $-946, 300. 49        $784, 440. 13

Allotted     ------------------------------------------                           1,366, 292. 68    -1, 039, 935. 29       764, 877. 32


Balance unexpended July 1, 1936-----------------------------                                                           $12, 325. 53
Amount allotted from War Dept. Appropriation
  Act approved April 26, 1934------------------- $25, 000. 00
Amount allotted from War Dept. Appropriation
  Act approved May 15, 1936------------- ---     794, 877. 32
                                                                                                                       819, 877. 32

     Amount to be accounted for-----------------------------                                                           832, 202. 85
Deductions on account of revocation of allotment-------------                                                           55, 000. 00
           Net amount to be accounted for------------------------                                                      777, 202. 85
566       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937'

Gross amount expended--------------------         $1, 818,250. 19
Less:
    Reimbursements collected--- - $1,032, 127. 63
    Receipts from sales_-----------    1, 682. 43
                                                   1, 033, 810. 06
                                                                           $784, 440. 13

      Balance unexpended June 30, 1937 ________---------7,                      237. 28
Outstanding liabilities June 30, 1937                       10, 843. 80
                                                           $------------
Amount covered by uncompleted contracts--------             93, 827. 44
                                                                           104, 671. 24

     Balance available June 30, 1937  ---------------------            -111, 908. 52
Accounts receivable June 30, 1937-__---__-------------------              999, 322. 71

      Unobligated balance available June 30, 1937 ----------           - -12,   585.81

       12. SAVANNAH RIVER, AUGUSTA, GA., FLOOD CONTROL

    Location.-The work covered by this project is located on the
right bank of the Savannah River, and extends from a point near the
western city limits of Augusta, Ga., downstream a distance of about
11 miles. The city of Augusta is located 218 miles by water above
the mouth of Savannah River (see U. S. Geological Survey map
of Georgia).
   Existing project.-This provides for increasing the height and
cross section of an existing levee 11.1 miles long, raising and strength-
ening appurtenant floodgate structures, constructing retaining walls
and paving riverside slopes where necessary, all at an estimated cost
of $685,000.
    The existing project was authorized by the Flood Control Act
approved June 22, 1936.
   Local cooperation.-See page 6.
   The City Council of Augusta, Ga., in meeting assembled, October
14, 1936, agreed to provide such right-of-way and borrow-pit areas
as may be required; to hold and save the United States free from
damages due to the construction works; and to assume the obliga-
tion of maintenance after the completion of work. It is probable
that the local cooperation will be fulfilled prior to the time funds
are available for the work.
   Condition at end of fiscal year.-No work has been done. The city
of Augusta completed, in 1916, a levee and appurtenant structures
to protect the city against floods in the Savannah River. As a result
of the 1929 floods, which damaged the levee and seriously threatened
the city, a plan for raising and strengthening the levee in accordance
with the present project was adopted by the Augusta Levee Com-
mission.
   In 1931 and 1932 all of that portion of the levee below Fifth Street
at Augusta was raised by the city to the grade but not the cross sec-
tion contemplated by the present project. Since 1933 the city, aided
by funds provided from Federal emergency appropriations, has
been raising and enlarging the earthwork of the levee above Fifth
Street, in accordance with the existing project. Work is now in
progress under a Works Progress Administration project in that
section of the levee immediately adjacent to the city.
              RIVERS AND HARBORS-SAVANNAH, GA., DISTRICT                                                   567
  Proposed operations.-The indicated allotment of $387,000 will
be applied as follows:
New Work:
   Surveys and plans -------------------------------------                $9, 000
   Constructing, by contract, river front levee and retaining walls_---_ 378, 000

                                                                                                       387, 000
  The additional sum of $248,000 can be profitably expended during
the fiscal year 1939, as follows:
New work: Constructing, by contract, river front levee and retain-
ing walls, and raising flood gate structures____---------          $248, 000
                                                                  _-----
   This work will complete the project.
                                   Cost and financial summary
Total amount .appropriated to June 30, 1937.     ._______._______.-----
Amount (estimated) required to be appropriated for completion of
  existing project----------    ---------------------------------- $248, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work                                                  248, 000
Status of reports called for by river and harbor acts and committee resolutions

                                                      Date trans-
        Locality             Authorization act         mitted to          Document no.            Recom    n
                                                       Congress

Atlantic Intracoastal      River and      Harbor     Apr.   3,1937   House, 194, 75th Cong.,      Favorable.
Waterway to the Gulf       Act, July 3, 1930.                        1st sess.
Intracoastal Water-
way across southern
Georgia or northern
  Florida.
Cape Fear River, N. C.,    Rivers and Harbors                    ...............
to St. Johns River,         Committee resolu-
Fla., Savannah, Ga.,       tion, Jan. 27, 1937.
and Jacksonville, Fla.,
waterway.
Cumberland Sound, Ga.      River   and    Harbor     Apr.   3,1937   House, 194,75th Cong.,          Do.
and Fla., to Mississip-    Act, Jan. 21, 1927.                        1st sess.
pi River, waterway.
St. Marys River to Gulf    River   and    Harbor ---- do...--....--..... do---.................
                                                                              -----------            Do.
Intracoastal Water-        Act, July 3, 1930.
way by most practi-
  cable route.
Savannah River below       Rivers and Harbors       June 17,1937     Rivers and Harbors              Do.
  Augusta, Ga.               Committee resolu-                         Committee, 39, 75th
                            tion, Jan. 27, 1937.                       Cong., 1st sess.



     IMPROVEMENT OF RIVERS AND HARBORS IN THE
            JACKSONVILLE, FLA., DISTRICT
   This district includes the waterways and harbors of the State of
Florida east of and including the Aucilla River, except Fernandina
Harbor, St. Marys River, Ga., and Fla., and their tributaries; it also
includes the watershed of the Suwannee River in the State of Georgia.
   District engineer: Lt. Col. Earl North, Corps of Engineers.
   Division engineer: Col. Earl I. Brown, Corps of Engineers.
568       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                      IMPROVEMENTS

                                        Page                                            Page
1. Waterway between Beaufort,                 14. Caloosahatchee R i v e r and
      S. C., and St. Johns River,                     Lake Okeechobee drainage
      Fla. (Cumberland Sound                          areas, Fla _-------               604
      to St. Johns River sec-                  15. Orange River, Fla ___....            617
       tion) ------------------         568    16. Charlotte Harbor, Fla .        ...   618
2. St. Johns River, Fla., Jack-               17. Caseys Pass (Venice Inlet),
      sonville to the ocean ---         569           Fla ---------------------         620
3. St. Johns River, Fla., Pal-                18. Sarasota Bay, Fla_________           622
      atka to Lake Harney ....          574    19. Manatee River, Fla_____              624
4. Oklawaha River, Fla ____---                20. Tampa Harbor, Fla ________           625
5. Atlantic-Gulf Ship Canal,                  21. St. Petersburg Harbor, Fla_          630
      Fla           _--------------     579    22. Channel f r o m Clearwater
6. Intracoastal Waterway from                        Harbor through Boca
       Jacksonville, Fla., to Mi-                     Ciega Bay to Tampa Bay,
      ami, Fla_                         582           Fla--------------------           631
7. Melbourne Harbor, Fla __--_         586    23. Anclote River, Fla_______--          632
8. Fort Pierce Harbor, Fla ....        587    24. Homosassa River, Fla___.             634
9. Lake Worth Inlet, Fla_____                 25. Steinhatchee River, Fla_____         636
                                        5930
                                               26. Removing the water hyacinth
10. Hollywood Harbor (Port Ev-                        from navigable waters ip
      erglades), Fla_________           594           the State of Florida ..--.-       637
11. Miami H a r b o r (Biscayne                27. Examinations, surveys, and
   (Bay), Fla -    -         -          596          contingencies (general) .__        638
12. Intracoastal Waterway from                 28. Other projects for which no
      Miami to Florida Bay, Fla_        601           estimates are submitted___        640
13. Key West Harbor, Fla .--            602    29. Plant allotment_--_------            640
1. WATERWAY BETWEEN BEAUFORT, S. C., AND ST. JOHNS RIVER,
    FLA. (CUMBERLAND SOUND TO ST. JOHNS RIVER SECTION)

  Location.-This section of the Intracoastal Waterway connects
Cumberland Sound, Ga. and Fla., with the St. Johns River, Fla.
(See U. S. Coast and Geodetic Survey Chart No. 3257.) (For Beau-
fort, S. C., to Cumberland Sound section, see p. 551.)
  Previous projects.-The first project for the improvement of this
section of the waterway was authorized by the River and Harbor
Act of May 23, 1828, and modified by River and Harbor Act of June
23, 1874. The cost and expenditures prior to 1913 were $97,565.55, for
new work. For scope of previous project see Annual Report for 1915,
page 1823.
  Existing project.--This provides for dredging and maintaining a
channel 100 feet wide and 7 feet deep at mean low water from Fer-
nandina Harbor to St. Johns River, a distance of 25 miles. The
mean range of tide is 6 feet at Fernandina and 4 feet in the St.
Johns River, with fluctuations from 1.5 to 2.5 feet, due to winds and
lunar phases.
  The estimate of cost for new work, made in 1913, was $101,000,
exclusive of amounts expended on previous projects. The latest
(1913) approved estimate for annual cost of maintenance is $1,000.
The existing project was authorized by the River and Harbor Act
approved March 4, 1913' (H. Doc. No. 898, 62d Cong., 2d sess.). No
map published.
            RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                                                    569
   Terminal facilities.-Exclusive of terminal facilities reported for
Fernandina Harbor, there are no terminals along this waterway.
   Operationrs and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1915 at a saving of $219 under the estimated cost. The
controlling depth at mean low water in April 1937 was 7 feet. The
costs and expenditures under the existing project have been $100,781.08
for new work and $46,357.77 for maintenance, a total of $147,138.85.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $14,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging with the U. S. dredge Congaree
and attendant plant during April 1939, removing shoals as required.
                                            Cost and financial summary
Cost of new work to June 30, 1937---------                                                             $198, 346. 63
Cost of maintenance to June 30, 1937---------------------                                  ------        46, 357. 77
      Total cost of permanent work to June 30, 1937--------------244, 704. 40
Net total expenditures----------------------------------------- 244, 704. 40
Total amount appropriated to June 30, 1937-------------------- 244, 704.40

    Fiscal year ending June 30                 1933          1934            1935           1936            1937


Cost of new work ..........
Cost of maintenance__________ _               $8, 168.01--------------$11,     549. 82
Total expended       __------------------      8,168.01--------------
                                                 168.01                  11,548. 74            $1.08
Allotted_ -----------------           __       8, 168. 01     $22, 000       3,000.00    -13,450.18-           ----


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance.----------------------------------     $14, 000.00
          2. ST. JOHNS RIVER, FLA., JACKSONVILLE TO THE OCEAN

   Location.-This river rises in the marshes of Brevard County,
Fla., near the east coast, and flows northwestwardly to Jacksonville,
thence eastwardly into the Atlantic Ocean, 122 miles south of
Savannah River. Its total length is about 285 miles. (See U. S.
Coast and Geodetic Survey Chart No. 577.)
  Previous projects.-Adopted by River and Harbor Acts of June 14,
1880, and June 3, 1896. The cost and expenditures were $4,063,535.91,
of which $3,520,137.39 was for new work and $543,398.52 was for
maintenance. For further details see page 1823 of Annual Report
for 1915.
  Existing project.-This provides for a channel 30 feet deep at local
mean low water from the ocean to Jacksonville, following generally
the line of the 24-foot channel secured under the previous project,
the width to be in general 300 feet in the straight reaches with 400
feet in Drummond Creek Cut, Trout Creek Cut, and Six Mile Creek
Cut, increasing to as much as 600 feet in the bends, except at these
570      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

three cuts where greater easing of bends is provided for, at Dames
Point where the width is to be 1,200 feet, and through the jetties, and
for an anchorage basin at Mayport (33/4 miles from the entrance)
800 feet in width beyond the channel limits. The project also pro-
vides for removing rock and overlying material to a depth of 24
feet at mean low water between the 24-foot curve and the pierhead
line at Jacksonville from the Florida East Coast Railway bridge to
Hogans Creek, a distance of 6,080 feet, and for dredging a channel
400 feet wide, 30 feet deep, along the terminals on the west bank of
the river between Commodores Point and deep water just above
Six Mile Creek Cut.
   Two converging rubblestone jetties have been built at the entrance.
The north jetty is 14,300 feet long and the south jetty is 11,183 feet
long. The jetties are parallel and 1,600 feet apart for a distance of
4,022 feet from the sea ends. Stone training walls have been built at
seven localities, involving about 7 miles of this class of structure.
Stone revetments at five localities provide about 3.5 miles of shore
protection. The training walls and revetments are located between
Dames Point and Wards Bank, near the inner ends of the jetties.
   The length of section included in the project is 28 miles. The
mean tidal range is 5.3 feet on the bar, 4.5 feet at Mayport, 2 feet
at Dames Point (14 miles above the entrance), and 0.9 foot at Jack-
sonville. The extreme range is 7.4 feet on the bar, 6.5 feet at May-
port, 4 feet at Dames Point, and 2.8 feet at Jacksonville. Strong
northeasterly winds raise the water level about 2 feet at Mayport
and 2 feet at Jacksonville. Strong southwesterly winds lower the
water about 11/2 feet at Mayport and 1 foot at Jacksonville.
   The estimate of cost for new work, revised in 1937, is $5,270,000,.
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $456,500.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for the main channel
 (H. Doc. No. 611, 61st Cong., 2d sess.) ; act of March 2, 1907, provided
for the harbor at Jacksonville (H. Doc. No. 663, 59th Cong., 1st
sess.). Act of June 5, 1920, combined these two projects; act of
July 3, 1930, provided for widening the bend at Dames Point (H.
Doc. No. 483, 70th Cong., 2d sess.); act of August 30, 1935, provided
for widening Drummond Creek Cut, Trout Creek Cut, and Six
Mile Creek Cut to 400 feet, and for greater easing of the connecting
bends and for dredging a channel 30 feet deep along the terminals
at Jacksonville (Senate Committee Print, 74th Cong., 1st sess.). The
latest published maps are in the last-mentioned document.
   Terminal facilities.-The Jacksonville municipal terminals at
Tallyrand Avenue, constructed and equipped at a cost of over
$3,000,000, consist of three piers, one having two galvanized iron
warehouses and another one, and all connected with a large storage
yard. One of the piers has been leased and a precooling plant for the
shipment of citrus fruits constructed thereon. There are 28 other
piers and wharves for handling general freight and private commodi-
       RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT           571

ties, 7 of which are open to the public. All have railway and highway
connections except one of the privately owned piers, which has high-
way connections only. In addition there are a number of other piers
used for various industrial purposes. The facilities are considered
adequate for the needs of the present commerce. (See Port Series
No. 8, Part 1, revised 1936, Corps of Engineers.)
   Operations and results during fiscal year.-Under a continuing
contract for dredging to widen Drummond Creek Cut, Trout Creek
Cut, and Six Mile Creek Cut to a width of 400 feet, and to construct
Terminal Channel 400 feet wide and 30 feet deep along the ter-
iminals on the west bank of the river at Jacksonville, work was com-
menced September 19, 1936, and at the close of the fiscal year the
widening of the three cuts had been completed and the dredging of
Terminal Channel was 95 percent completed. A total of 3,829,968
cubic yards of material was removed, of which 3,091,564 cubic yards
were removed from Terminal Channel and approaches, in which
drilling and blasting operations were required. The cost was
$1,206,917.28 for new work.
   Under a contract for constructing dike and spillway for mainte-
nance spoil areas at Dames Point, work was commenced August 24,
1936, and completed November 19, 1936. One spillway and 7,144
linear feet of dike were constructed to an average crest height of
about 13 feet above local mean low water, involving the placing of
19,313 cubic yards of material. The cost was $6,856.97 for mainte-
nance.
   The U. S. pipe-line dredge Pullen was employed from July 1,
1936 to April 6, 1937, for maintenance dredging. Project dimen-
sions were restored in Mayport Cut, Pilottown Cut, Mayport An-
chorage, Sherman Cut, Mile Point Cut, Fulton Cut, and Dames
Point Cut, and a triangular shaped area at the lower end and on
the northerly side of Dames Point Cut was removed. There were
removed 2,112,786 cubic yards of material at a cost of $212,501.95.
The U. S. seagoing hopper dredge Comstock was employed from
November 19, 1936 to January 30, 1937, for maintenance dredging
to a depth of 30 feet in the inner end of Bar Cut, at the entrance
to the river. There were removed 270,790 cubic yards, bin measure-
ment, of material at a cost of $39,847.90. The cost of precontract
surveys in connection with new work was $381.12. The cost of sur-
veys and contingencies incidental to the supervision of the project
was $8,246.50 for maintenance.
   The costs for the year were $1,207,298.40 for new work and $267,-
453.32 for maintenance, a total of $1,474,751.72. The expenditures
were $1,363,768.31, all from regular funds.
   Condition at end of fiscal year.-The existing project is about 99
percent completed. The jetties and all training walls and revet-
ments at present considered necessary have been completed. The
inner end of the north jetty has been capped with concrete and the
easterly end of the Wards Bank training wall has been revetted
with granite riprap. Material dredged from the north side of
572      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Wards Bank Cut and deposited adjacent to and on the north side of
the north jetty, in the vicinity of the Fort George Inlet encroach-
ment, has effectively protected this structure. The jetties, revet-
ments, and training walls are in good condition, except the south
jetty at the inner end and the Browns Creek revetment, which are
in poor condition, and the Dames Point training wall, which is in
fair condition. All original dredging has been completed except
the construction of Terminal Channel, which is in progress and 95
percent completed. Project depth of 30 feet at local mean low water,
with reduced width at several localities, exists except at Mile Point
Cut, where the controlling depth is 28.3 feet for project width, and
at Drummonds Creek Cut, where the controlling depth is 29.9 feet
for a width of 275 feet. Traffic over the waterway by all types of
vessels is no longer discontinued during the hours of darkness. The
project depth of 24 feet between the 24-foot contour and the pier-
head line, from the Florida East Coast Railway bridge to Hogan
Creek, exists. The work remaining to be done to complete the project
is the completion of Terminal Channel under an existing contract.
    Under regular funds the costs of the existing project to the end
of the fiscal year have been $4,915,927.63 for new work and $8,156,-
973.27 for maintenance, a total of $13,072,900.90, and the expenditures
have been $12,972,404.24. With Public Works funds the cost and
expenditures have been $290,013.37, all for new work. The total
cost of the existing project, all funds, has been $13,362,914.27, of
which $5,205,941.00 was for new work and $8,156,973.27 for mainte-
nance. The total expenditures have been $13,262,417.61.
   Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1937, together with an allotment of $180,000 made
during July 1937, a total of $371,349.79, less $20,000 to be revoked,
will be applied as follows:
Accounts payable June 30, 1937---__------------------------------ $116, 615. 69
New work: Complete, during July 1937, continuing contract for
  widening Drummond Creek, Trout Creek, and Six Mile Creek
  Cuts, and the construction of Terminal Channel---------------     65, 734. 10
Maintenance:
    Repair by leased plant and hired labor, during
      December 1937-February 1938, the inner end of
      north jetty between stations 5030 and 5638-      $30, 000. 00
    Dredging with U. S. dredge Pullen and attendant
      plant, 5 months, October 1937-February 1938, re-
      moving shoals throughout the project as re-
       quired       --     -____                       109, 000. 00
    Dredging with a United States hopper dredge at
      entrance, 11/ months, during March and April
      1938-----------------------------------------     30,000.00
        Total for maintenance                           ____---___-______
                                                                       169, 000. 00
        Total for all work_---___-__       _       --        --     _   351, 349. 79
   The additional sum of $345,000 can be profitably expended during
the fiscal year 1939 as follows:
Maintenance:
   Dredging with U. S. dredge Pullen and attendant plant, 8 months,
      July 1938-February 1939, removing shoals throughout the project
      as required --------------           ---        -    -       - $185, 000
   Dredging with a United States hopper dredge at the entrance, 3
      months, January-March     1939_   ----        _-____-__--_            60, 000
              RIVERS AND HARBORS-JACKSONVILLE,                                      FLA., DISTRICT                   573
Maintenance--Continued.
   Repair, by contract, during October-December 1938, of approxi-
      mately 5,000 linear feet of inner end of south jetty_____ ____$60, 000
   Construct, by contract, during August and September 1938, ap-
      proximately 1,200 linear feet of revetment extending upstream
      from existing revetment at Wards Bank Training Wall ---        - 40, 000

               Total for maintenance- ------------------                                      -                 345, 000
                                         Cost and financial summary

Cost of new work to June 30, 1937----------------------------                                        $8, 726, 078. 39
                                    ---------------
Cost of maintenance to June 30, 1937__                      -                                         8, 700, 371. 79

      Total cost of permanent work to June 30, 1937__________                                        17, 426, 450. 18
Undistributed costs June 30, 1937---------------__-                                                       14, 647. 08
      Net total cost to June 30, 1937 __-__-                                   -      -__ ___-17, 441. 097. 26
Plus accounts receivable June 30, 1937_-----------                                                  1, 471. 95

      Gross total costs to June 30, 1937---------------------                                        17,442, 569. 21
Minus accounts payable June 30, 1937.- _____-____________                                            - 116, 615. 69

     Net total expenditures_____                         __-_____ -____-                          117, 325, 953. 52
Unexpended balance June 30, 1937-                         ---.                                         189, 877. 84
           Total amount appropriated to June 30, 1937_____--________                                 117, 515, 831. 36

    Fiscal year ending June 30              1933            1934             1935             1936               1937


Cost of new work..--------                               $297,408.67       $11, 547.02     $27, 362. 95    $1, 207, 298. 40
Cost of maintenance-..-----------.....   $987, 899. 05    398, 386. 94     320, 654.49     306, 637.08         267, 453. 32
        Total cost- ---------------       987, 899. 05    695, 795. 61     322, 201. 51    334, 000.03      1, 474, 751. 72
Total expended ----------------           966, 791. 30    633, 334. 34   -299, 512. 95     359, 020. 34     1, 363, 768. 31
Allotted                          1,034, 834. 94 761, 929. 90
              ___......--------------..................                  -375, 451. 44    1,004, 873.05         650, 000. 00


Balance unexpended July 1, 1936______                                        -___ -_____                 $903, 646. 15
Amount allotted from War Department Appro-
  priation Act approved Apr. 26, 1934_________                                 $159, 415. 78
Amount allotted from War Department Appro-
  priation Act approved Apr. 9, 1935__________                                      8, 100. 97
Amount allotted from War Department Appro-
  priation Act approved May 15, 1936 _______                                    502,483. 25
                                                                                                          670    000 00

Amount to be accounted for_... __.___.._______________-      -__                                      1, 573, 646. 15
Deductions on account of revocation of allotment ________-..                                              20, 000. 00
       Net amount to be accounted for_                                                                 1, 553, 646. 15
Gross amount expended ---            _____--_ _------
                                                  $1, 391, 445. 37
Less :
    Reimbursements collected------- $27, 676. 06
     Receipts from sales __- _______       1. 00
                                                       27, 677. 06
                                                                                                       1, 363, 768. 31
      Balance unexpended June 30, 1937______                                                              189, 877. 84
Outstanding liabilities June 30, 1937_________                                 $116, 615. 69
Amount covered by uncompleted contracts-----                                     68, 442. 30
                                                                                                          185 ,vy)
                                                                                                                0.57. 99
                                                                                                               V-     vv

     Balance available June 30, 1937 __ __ __ ___________
                                                    ---                                                     4, 819. 85
Accounts receivable June 30, 1937___________-
                                   ._______         ----                                                    1, 471. 95
   1 Includes       $290,013.37 Public Works funds.
574        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Unobligated balance available June 30, 1937 ------------------           $6, 291. 80
Amount allotted from War Department Civil Appropriation
  Act approved July 19, 1937      -------------                         180, 000. 00

     Balance available for fiscal year 1938------------------           186, 291. 80
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 2- - - - - - - - - - - - - - - - - --
                                                                        345, 000. 00
  2Exclusive of available funds.

       3. ST. JOHNS RIVER, FLA., PALATKA TO LAKE HARNEY

   Location.-For location of the St. Johns River see page 569. (See
U. S. Coast and Geodetic Survey Charts Nos. 684, 508, 509, and 458.)
   Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, and July 5, 1884. The cost and expenditures were
$55,404.26, of which $29,566.26 was for new work and $25,838 was
for maintenance. For further details see page 1824 of Annual
Report for 1915.
   Existing project.-This provides for a channel 8 feet deep at local
mean low water and 100 feet wide from Palatka to Sanford (90
miles) and 5 feet deep at local mean low water and 100 feet wide
from Sanford to Lake Harney (25 miles). This project is an en-
largement and extension of previous projects and embraces two mat-
tress and stone jetties and two lines of guide piles at Volusia bar,
at the head of Lake George, built under previous projects; and
dredging and making cut-offs and easing bends in the river. The
length of the section included in the project is 115 miles, and its
lower end is 83 miles above the entrance to the river. At Palatka
the mean tidal range is 0.9 foot and the extreme range about 1.7 feet.
At low-water stages tidal effect is perceptible in Lake George, 40
miles above Palatka. Strong northerly and northeasterly winds raise
the water level at Palatka about 1 foot, and strong southerly and
southwesterly winds lower it about the same amount under ordinary
conditions. The flood stages in the river usually occur during the
fall months and are normally about 2 feet above ordinary low-water
level at Palatka, 3 feet at Lake George, 5 feet at Sanford, and 6.5
feet at Lake Harney. Considerably higher stages are sometimes
experienced.
   The estimate of cost for new work, revised in 1930, is $215,600,
exclusive of amounts expended on previous projects. The latest
 (1920) approved estimate for annual cost of maintenance is $10,000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1111, 60th Cong., 2d sess.); and modified
by the River and Harbor Act of July 3, 1930, to include cut-offs at
Butcher Bend, Snake Creek, and Starks, and easing bends at other
points (H. Doc. No. 691, 69th Cong., 2d sess.). The latest published
maps are in the project documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-These consist of seven general freight piers
having a total frontage of about 600 feet, including a municipal con-
crete recreation pier with boat basin adjoining at Sanford and a
municipal wharf at Palatka. All piers have highway connections
and one at Palatka has railway connections. At Sanford, privately
owned facilities have been constructed for unloading and storing
              RIVERS AND HARBORS-JACKSONVILLE,                                               FLA., DISTRICT              575
gasoline, kerosene, and fuel oil. In addition, there are a number of
small privately owned wharves at various points along the river. The
facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-The removal of shoals
to a depth of 8 feet and the easing of bends between Lake George
and Lake Monroe by leased dredge, which was in progress at the
beginning of the fiscal year, was completed July 8, 1936. A total
of 30,502 cubic yards of material was removed at a cost of $5,345.90
for maintenance.
   Under the provisions of section 3 of the River and Harbor Act
of July 3, 1930, a leased dipper dredge was employed from Novem-
ber 30, 1936, to December 18, 1936, in removing troublesome shoals
in the waterway between DeLeon Springs and the St. Johns River.
Two cuts were made in Spring Garden Creek, one at the entrance
to Lake Woodruff 3.6 feet deep, 50 feet wide, and 1,900 feet long, and
the other a short distance upstream 4.3 feet deep, 40 feet wide, and
1,400 feet long. A total of 15,337 cubic yards of material was
removed at a cost of $1,000.
   The total cost for the year was $6,345.90 for maintenance and the
total expenditures were $14,891.29.
   Condition at end of fiscal year.-The existing project is about 98
percent completed. The section from Sanford to Lake Harney was
completed in 1912. The modified project for the section from Palatka
to Sanford was completed during 1935, except for the easing of sev-
eral bends. Project depth of 8 feet for a width of 100 feet existed,
in June 1936 from Palatka to Sanford and the controlling depth
from Sanford to Lake Harney, in July 1936, was 4 feet.
  The costs and expenditures under the existing project have been
$180,493.66 for new work and $220,257.89 for maintenance, a total of
$400,751.55.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1938.
   The sum of $20,000 can be profitably expended during the fiscal
year ending June 30, 1939, in dredging, by contract, during period
March-May 1939, to restore project dimensions throughout the
project.
                                                   Cost and financial summary
Cost of new work to June 30, 1937 -------                                    ------------------- $210, 059. 92
Cost of maintenance to June 30, 1937                                    ------------------------  246, 095. S!)
      Total cost of permanent work to June 30, 1937-------                                        ------         456, 155. 81
Net total expenditures   .---------------------  ---------------                                                 456, 155. 81
Total amount appropriated to June 30, 1937-------------------                                                    456,155. 81

    Fiscal year ending June 30                        1933            1934           1935           1936             1937


,Cost of new work--------      ----------------------------
Cost of maintenance-------------   $1,123. 93   $29, 575.02
                                                                                   $27,867.00
                                                                                    17, 287. 79
                                                                                                      $47.34----
                                                                                                  10, 902. 52  $6, 345.90
                                                                                                                            --
       Total cost ----------------                    1, 123. 93     29, 575. 02    45, 154. 79    10, 949. 86        6, 345. 90

Total expended.......----   ..-------------.....             7. 64   30, 691. 31    36, 412. 81    11, 146. 45       14, 891. 29

Allotted.-----------------------                     18,880. 24      50, 691. 31     7, 000.00     18, 000.00       -2, 549. 45

          20196--37--pt. 1-                 37
576      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936--------------------------------$17, 440. 74
Deductions on account of revocation of allotment ----------------- 2, 549. 45

      Net amount to be accounted for---------------------------      14, 891. 29
Gross amount expended-----------                      $14, 956. 45
Less reimbursements collected------------------------       65. 16
                                                                     14, 891. 29

Amount (estimated) required to be appropriated for completion
of existing project--------------------------------------------     10, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance                                           20, 000. 00

                        4. OKLAWAHA RIVER, FLA.

  Location.-This river has its source in the system of large lakes in
the central part of the peninsula of Florida and flows in a general
northerly direction, then eastwardly, emptying into the St. Johns
River 22 miles above Palatka. The extreme head of the system may
be taken as Lake Apopka, 120 miles above the mouth of the river.
  Previous projects.-The first improvement was authorized by an
act of Congress approved February 24, 1835. The amount expended
prior to the existing project was $3,911.95 for new work. For fur-
ther details see page 1825 of Annual Report for 1915.
  Existing project.--This provides for deepening the channel to 6 feet
at mean low water from the mouth to the head of Silver Springs
Run, a distance of 58 miles; for clearing the channel of obstructions
from Silver Springs Run to Lake Griffin, including the Kyle and
Young Canal and its extension to Morrisons Landing and the J. D.
Young Canal from Morrisons Landing to Starkes Ferry (clear title
to the canals and sufficient land adjacent thereto to provide for future
widening has been conveyed to the United States), with a view to
obtaining a navigable depth of about 4 feet to Leesburg, 87 miles
above the mouth. The work embraces dredging, snagging, cut-offs
at sharp bends, removal of overhanging trees and obstructive aquatic
vegetation, and the construction of a lock and dam at Moss Bluff to
retain the water level in Lake Griffin.
                        Lock and dam at Moss Bluff

Distance to nearest town; 20 miles by canals.
Name of nearest town: Leesburg, Fla.
Distance above mouth of river: 66.3 miles by canals.
Distance above mouth of Silver Springs Run: 13.7 miles.
Width of lock chamber: 30 feet.
Greatest available length for full width: 125 feet.
Lift above low water: 11.5 feet.
Depth on upper miter sill at normal pool level: 7 feet.
Depth on lower miter sill at low water: 7 feet.
Character of foundation: Piles in sand and clay.
Character of construction: Concrete, with timber gates.
Kind of dam: Movable.
Type of dam : Needle.
Completed in 1925.
Total cost: $161,000.
  The river is nontidal except for a short distance above the mouth
at the St. Johns River, where a mean range at low-water stage of
about 0.5 foot is found. The mean fluctuation due to rainfall is
about 2 feet at the mouth, about 3 feet at the mouth of Silver Springs
Run, and about 2 2 feet at Lake Griffin. The extreme fluctuation is
       RIVERS AND HARBORS-JACKSONVILLE,          FLA., DISTRICT   577
about 3 feet at the mouth, 5 feet at Silver Springs Run, and about
41/2 feet at Lake Griffin.
    The estimated cost of the work proposed, revised in 1929, is
 $351,000, exclusive of amount expended on previous projects. The
latest (1929) approved estimate of cost for annual maintenance is
 $17,000, including $2,000 for operating and care of lock and dam.
    The existing project was adopted by the River and Harbor Act of
September 19, 1890 (Annual Report for 1889, pp. 1360-1364). It
was modified by the River and Harbor Act of March 2, 1907 (H. Doc.
No. 782, 59th Cong., 1st sess.), and was extended by the River and
Harbor Acts of June 25, 1910, and July 25, 1912, to include main-
tenance of the levels of the lakes at the head of the river. The River
and Harbor Act of July 27, 1916, provided for the acceptance of
certain artificial waterways and extensions thereof between Heather
Island (5.6 miles above the mouth of Silver Springs Run) and Lake
Griffin as part of the watercourse in lieu of portions of the natural
bed of the river. Operation and care of the lock and dam was in-
cluded in the project July 1, 1935, under the provisions of the
Permanent Appropriation Repeal Act of June 26, 1934.
    The latest published maps will be found in House Document No.
514, Sixty-third Congress, second session, and Annual Report for
1891, page 1626.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are numerous privately owned landings
along this river, more or less out of repair; no charges for wharfage.
One wharf at Leesburg has railway connection. The facilities are
considered adequate for the small commerce.
    Operations and results during fiscal year. Maintenance.-Work
under contract for the repair and restoration of earthen dike between
Starkes Ferry and the Moss Bluff lock, in progress at the beginning
of the fiscal year, was completed December 31, 1936. There were
placed in the dike 52,708 cubic yards of material at a cost of $23,-
023.60. A total of 1,859 obstructions, consisting of snags, over-
hanging trees and brush, was removed by United States plant and
hired labor as necessary between the Moss Bluff lock and the mouth
of the river at a cost of $1,960.58. The cost of surveys and con-
tingencies incidental to the supervision of the project was $1,611.35.
   Operating and care.-The lock at Moss Bluff, Fla., was operated,
and buildings, grounds, lock, dam, and equipment were cared for, all
with Government plant and hired labor. There were 176 lockages.
The costs were $361.52 for operation of the lock, $3,305.68 for ordi-
nary maintenance and repair, and $4.52 for repairs to needle bearhs
and fenders.
   The costs for the year were $26,595.53 for maintenance and $3,671.72
for operating and care, a total of $30,267.25. The expenditures were
$23,331.67.
   Condition at end of fiscal year.-The existing project is about 89
percent completed. By dredging, making cut-offs, and snagging, a
channel has been obtained with a depth of about 5 feet at ordinary
stages from St. Johns River to Silver Springs Run, 52.6 miles above
the mouth. The work of dredging a channel 4 feet deep at low water
stages, with a 30-foot bottom width between Silver Springs Run
and the lock at Moss Bluff, was completed in 1929. The lock and
578      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

dam at Moss Bluff were completed in 1925 and are in good condition.
The United States reservation comprises 13.14 acres of land, a
dwelling, and a storehouse, which are in good condition. A large
portion of the dredging of the canal from Moss Bluff lock to Starkes
Ferry has been done by private interests. The widening and deepen-
ing of the diversion canal from Moss Bluff lock to Starkes Ferry,
to provide for the control of Lake Griffin, was completed in 1930,
and the dike on the east side has recently been repaired and im-
proved. The waterway is reasonably free from overhanging trees,
snags, and obstructions. Owing to lack of maintenance in recent
years, the channel has filled in and bars have formed, reducing the
controlling depths and making the channel very tortuous and narrow.
The controlling depths at ordinary low stages are 4 feet from the
mouth of the river to Silver Springs Run, 6 feet in Silver Springs
Run, 4 feet from Silver Springs Run to Moss Bluff, 4 feet from Moss
Bluff to Starkes Ferry, and thence 4 feet to Leesburg. The work
remaining to be done to complete the project is the easing of several
sharp bends and the obtaining of project width and depth in the
section between the mouth of the river and the mouth of Silver
Springs Run, which is not considered necessary at this time.
   The costs of the existing project have been $311,352.45 for new
work, $284,109.27 for maintenance, and $8,524.58 for operating and
care, a total of $603,986.30. The total expenditures have been $603,-
624.28. In addition the sum of $11,414.41 was expended between
August 1, 1929, and June 30, 1935, on the operation and care of the
works of improvement under the provisions of the permanent indefi-
nite appropriation for such purposes.
   Proposed operations.-The balance unexpended on July 1, 1937,
together with an allotment of $4,500 made during July 1937, a total
of $6,678.69, will be applied as follows:
Accounts payable June 30, 1937--------------------------------                 $362. 02
Maintenance:
    Occasional snagging throughout the project by hired
      labor and U. S. derrick boat D-5------------ ------ $3, 500. 00
    Miscellaneous surveys and investigations-____----- 816. 67
    Operating and care of lock and dam at Moss Bluff,
      Fla.:
        Operatio_------------------------------- 1, 300. 00
        Ordinary maintenance and repair----------------450. 00
         Emergencies ------------------          __   ___          250. 00
                                                                              6,316. 67

         Total for all work_   ._____------__-___-         6, 678. 69
  The additional sum of $4,500 can be profitably expended on main-
tenance during the fiscal year 1939 as follows:
Maintenance :
    Operation and care of lock and dam at Moss Bluff, Fla ..........    $2, 000
    Snagging, by hired labor and U. S. Derrick boat D-5, as required
      throughout the project ------                                      2, 000
   Miscellaneous surveys and investigations________-___--            -____ 500
      Total for maintenance_---------....   __        -   ______       ___-      4, 500
   No funds can be profitably expended for new work during the
fiscal year 1939 as the completion of the project is not considered
essential at this time.
              RIVERS AND HARBORS-JACKSONVILLE,                                             FLA., DISTRICT                 579
                                                Cost and financial summary

Cost of new work to June 30, 1937       -------------------------      $315, 264.40
Cost of maintenance to June 30, 1937---        .------                1304, 048. 26
                                                                _---_----------
      Total cost of permanent work to June 30, 1937                                                               6------312. 66
                                                                                                                  619,
Minus accounts payable June 30, 1937-   ------------------                                                              362. 02

     Net total expenditures -------------------------     --                                                      618, 950. 64
Unexpended balance June 30, 1937---------------------------                                                         2, 178. 69

           Total amount appropriated to June 30, 1937____-----_---                                                621,129. 33

    Fiscal year ending June 30                          1933          1934          1935                1936           1937


Cost of new work---         . ....           I-----------            -----
Cost of maintenance-------------                      $13, 733. 27   $1,887. 26    $8,862.04       $14, 552. 46       $30, 267. 25
Total expended...-----------------..                   13, 802. 51    1, 795. 39    8, 526. 44      21, 553. 49        23, 331.67

Allotted------..........----------------               14, 480. 70    6, 128. 61    7, 000. 00      46, 500. 00       -5, 000. 00


Balance unexpended July 1, 1936_$---------------------------30, 510.36
Deductions on account of revocation of allotment--...-------------- 5, 000. 00
      Net amount to be accounted for-----------------------                                                        25, 510. 36
Gross amount expended _--   --.---------.            ---    $30, 660. 52
Less reimbursements collected_-------------           ___     7, 328. 85
                                                                                                                   23, 331. 67
Balance unexpended June 30, 1937----            ....------------------                                              2,178. C69
Outstanding liabilities June 30, 1937_ --------            --                                      -
                                                                                                 __--                 362. 02
Balance available June 30, 1937----------------                                                                     1,816. 67
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--------------------------------------                                                         4, 500. 00
     Balance available for fiscal year 1938--------------------6, 316. 67
Amount (estimated) required to be appropriated for completion of
   existing project           2------------------__                                                                39, 600. 00
Amount that can be profitably expended in fiscal year ending June
                              -
30, 1939, for maintenance 2-____                     --
                                                               ___                                                  4,500. 00
   1Includes $11,414.41    from permanent indefinite appropriation for operation and care.
   2 Exclusive of available funds.


                               5. ATLANTIC-GULF SHIP CANAL, FLA.

   Location.-This canal will extend from the mouth of the St. Johns
River near Jacksonville, Fla., along the channel of the St. Johns
River to Palatka, Fla., and thence in a general southwesterly direc-
tion to a point south of Ocala, Fla., and thence westerly to the
Withlacoochee River near Dunnellon, Fla., and along the valley of
the Withlacoochee River westerly to deep water in the Gulf of
Mexico. Its total length will be about 195 miles from deep water in
the Atlantic Ocean to deep water in the Gulf of Mexico.
   Previous projects.-None. The portion of the St. Johns River
included in this project is reported upon separately under the project
for St. Johns River, Fla., Jacksonville to Ocean (p. 569) and "St.
Johns River, Fla., Jacksonville to Palatka." (p. 640).
   Existing project.-This provides for a sea-level ship canal across
Florida by way of St. Johns River from its mouth to Palatka, thence
by way of the Oklawaha and Withlacoochee Rivers, to enter the
580      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gulf near Port Inglis, connecting the Atlantic Ocean and the Gulf
of Mexico.
   This canal will be 30 feet deep below mean sea level, 400 feet wide
from Jacksonville to Palatka, 250 feet wide from Palatka to the Gulf,
and from 500 to 1,000 feet wide in the Gulf channel. The total
length from deep water to deep water is 195 miles. The project
includes all work of dredging, excavation, construction of bridges,
and regulatory or control works, and all other works necessary for
the completion of the project.
   The estimate of cost for new work, made in 1934, is $143.000 000.
The annual cost of maintenance upon completion is estimated (1934)
to be $1,000 000 per annum for the first 5 years and $500,000 per an-
num thereafter.
   The existing project was authorized on August 30, 1935, under
the provisions of the Emergency Relief Act of 1935, approved April
8, 1935.
   Recommended modifications of project.-Under date of April 1,
1937, the Chief of Engineers recommended the construction of a sea-
level ship canal following Route No. 13-B, having minimum depths
of 33 feet increased to 34 feet for the outer 8.5 miles of the Gulf ap-
proach channel; 400 feet in minimum bottom width from the Atlantic
Ocean to a point in the Gulf 4.5 miles from shore, thence 500 feet
wide for 5.4 miles, 730 feet for 7.0 miles, and 1,000 feet for 8.5 miles;
and the protection of the Gulf approach channel by 2 jetties, that on
the south side extending 17 miles from shore and that on the north
4.5 miles from shore, at an estimated cost of $197.921,000 for con-
struction (exclusive of amounts previously expended) and $1,090,-
000 annually for maintenance, subject to the conditions that local
interests furnish, free of cost to the United States, all rights-of-way
and other lands necessary for the construction and maintenance of
the canal and accept the obligation of maintaining and operating
the bridges started as a part of the relief project and of building,
maintaining and operating any further necessary highway crossings.
 (H D'c. No. 194, 75th Cong. 1st sess.).
   Local cooperation.-The Ship Canal Authority of the State of
Florida, created by the State Legislature, is furnishing the right-of-
way free of cost to the United States.
   Terminal facilities.-For terminal facilities at Jacksonville see
Port Series No. 8, Corps of Engineers, and the report on the project
for St. John River, Fla., Jacksonville to the ocean (p. 569).
   Operations and results during fiscal year---Regular funds.-None.
   Emergency relief funds.-Work under four contracts for excava-
tion of overburden in central areas, which was in progress at the:
beginning of the fiscal year, was completed July 18, 1936. A total
of 914,689 cubic yards of material was removed at a cost of $212,-
812.89. Work under contract for the construction of foundations
for the highway bridge at Santos, Fla., in progress at the beginning
of the fiscal year, was completed September 1, 1936. The work in-
volved principally the excavation of 471 cubic yards of rock and
2C2 cubic yards of earth and the placing of 2,260.95 cubic yards of
reinforced concrete. The total cost was $45,110.46.
       RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                        581
   Necessary surveys, subsurface borings, and acquisition of land
titles were carried on by hired labor at a cost of $1,057.27. Prepa-
ration by hired labor of plans and designs of dredging units cost
 $1,404.38. General sanitation work and mosquito control by hired
labor cost $1,011.17. Engineering and geological studies, including
the inspection and maintenance of 150 ground water observation
points and two automatic tide gages, were in progress throughout
the year by hired labor at a cost of $7,936.42.
    All operations, except engineering and geological studies and
necessary camp maintenance, were discontinued September 1, 1936.
To become effective July 1, 1937, Camp RooseveTt at Ocala, Fla.,
including buildings, materials, supplies, and equipment, was trans-
ferred to the Works Progress Administration for operation and
maintenance, with the understanding that the facilities are to be re-
turned to the Engineer Department if and when the construction
of the canal should be resumed. Liquidations during the fiscal year
reduced the cost by $20,170.83. The total cost for the fiscal year wad
$249,161.76, all for new work. The total expenditures were $564,-
715.13, all from Emergency Relief funds.
    Condition at end of fiscal year.-The existing project is about 3
percent completed. Approximately 32 percent of the total estimated
clearing has been completed; about 22 percent of the dry earth ex-
cavation has been completed; foundations for the highway bridge
at Santos, Fla., have been completed and borings and surveys for
two railroad bridge sites at Santos and one highway bridge site at
Dunnellon, Fla., are practically complete. Construction of the dis-
trict office on the reservation at Camp Roosevelt at Ocala, Fla., is
about 46 percent completed and general surveys are about 40 percent
completed.
    The total cost has been $4,575,869.15 for new work. The total
expenditures have been $5,100,583.04, all from Emergency Relief
funds.
   Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1937, amounting to $78,966.13, less accounts pay-
able amounting to $5,531.33, is available for revocation.
    No funds can be profitably expended during the fiscal year 1939.
                          Cost and financial summary

Cost of new work to June 30, 1937                                   4, 575, 809. 15
                                                                   $----------------------
Cost of maintenance to June 30, 1937___
      Total cost of permanent work to June 30, 1937 -__.______     4, 575, 869. 15
Undistributed costs June 30, 1937 -----------------------             517, 096. 05

      Net total cost to June 30, 1937------------------        _   5, 093, 565.20
Plus accounts receivable June 30, 1937   ------- _____________         12, 54J. 17

      Gross total costs to June 30, 1937-----------------          5, 106, 114. 37
Minus accounts payable June 30, 1937____________--------------_         5, 531. 33

     Net total expenditures ------------------------------         5, 100, 583.04
Unexpended balance June 30, 1937_---                                   66, 416. 91
                                                                       6--__--------------
      Total amount appropriated to June 30, 1937------------       5, 167, 000. 00
582         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


   Fiscal year ending June 30         1933             1934                 1935               1936              1937


Cost of new work--......-------------...........
                                   -----         ------------ -------------- $4,326, 707.39                    $249, 161. 70
Cost ofmaintenance........---------------------------- ------------
                                                                ............-----------                      -------------
Total expended..................--------------- ....   ....--------------    ---- __...   4, 535, 867. 91       564, 715 13
Allotted---------------------        --------------           --------------              5, 400, 000. 00     -233, 000. 00

Balance unexpended July 1, 1936---------------------------      $864, 132.09
Deductions on account of revocation of allotment---------------233, 000. 00

      Net amount to be accounted for_______6___      __                                                     6-_ 132. 09
                                                                                                            631,
Gross amount expended----------------------$851, 955. 32
Less:
    Reimbursements collected------     $256, 627. 27
    Receipts from sales--------------- 30, 612. 92
                                                      287, 240. 19
                                                                                                            564, 715. 13
      Balance unexpended June 30, 1937----------------------                                                 66,416. 96
Outstanding liabilities June 30, 1937 __... ___. - $5, 531. 33
Amount covered by uncompleted contracts ________ 4, 718. 46
                                                                                                             10, 249. 79
     Balance available June 30, 193.-----------------------                                                  56,167. 17
Accounts receivable June 30, 1937    -----          -    -                                                   12, 549. 17

        Unobligated balance available June 30, 1937 -----------                                              68, 716. 34
    6. INTRACOASTAL WATERWAY FROM JACKSONVILLE, FLA., TO
                         MIAMI, FLA.
    Location.-The waterway extends from Jacksonville to Miami,
Fla., following the St. Johns River to the mouth of Pablo Creek,
23 miles, and thence following in general the line of a canal con-
structed by the Florida Coast Line Canal & Transportation Co.
  (See U. S. Coast and Geodetic Survey Charts Nos. 842, 843, 844, 845,
846, and 847.)
    Previous projects.-Adopted by River and Harbor Acts of June
15, 1844, July 13, 1892, August 18, 1894, and Deficiency Act of Feb-
ruary 26, 1896. The cost and expenditures on these projects to June
30, 1927, were $307,997.50, of which $94,775.25 was for new work and
 $213,222.25 for maintenance. For further details see page 1825 of
Annual Report for 1915 and page 655 of Annual Report for 1926.
    Existing project.-This provides for an inland waterway in gen-
eral 100 feet wide and 8 feet deep at local mean low water from
Jacksonville to Miami, Fla., a distance of 372 miles, following the
coastal route; and for a turning basin 8 feet deep, 400 feet wide
and 800 feet long in the vicinity of Jacksonville Beach, Fla. Depths
in excess of those called for under this project already existed in the
St. Johns River from Jacksonville to a point 23 miles east and
also for a total of about 74 miles between the St. Johns River and
Miami, or about 25 percent of the total length of the project. The
project also includes the operation and maintenance of the bridge
near Palm Valley, the title to which was passed to the United States,
along with all other property of the Florida Coast Line Canal &
Transportation Co., under the conditions of local cooperation.
    The mean range of tide is 4 feet at the St. Johns River, 0.7 foot in
the Indian River at Fort Pierce, 1.8 feet in Lake Worth at the Port
       RIVERS AND HARBORS-JACKSONVILLE,            FLA., DISTRICT   583

of Palm Beach terminals, 2.3 feet at the Port Everglades terminals,
and 1.4 feet in Biscayne Bay. The extreme range is about 6 feet
at the St. Johns River, 3 feet at Fort Pierce, and 2.4 feet in Bis-
cayne Bay. Tidal effect is imperceptible at points along the water-
way distant from inlets.
   The estimate of cost for new work, revised in 1937, is $7,271,500, ex-
clusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $129,000, includ-
ing $3,500 for the operation and care of the bridge near Palm Valley.
   The existing project was adopted by the River and Harbor Act
approved January 21, 1927 (H. Doc. No. 586, 69th Cong., 2d sess.),
which provided for a bottom width of 75 feet, and modified by the
River and Harbor Act of July 3, 1930, to provide for a width of 100
feet (S. Doc. No. 7-, 71st Cong., 2d sess.), the River and Harbor Act
of August 26, 1937, provided for the turning basin in the vicinity
of Jacksonville Beach (H. Doc. No. 180, 75th Cong., 1st sess.). Op-
eration and care of the bridge was included in the project July 1,
1935, under the provisions of the Permanent Appropriation Repeal
Act approved June 26, 1934. The latest published map of the entire
waterway is in House Document No. 586, Sixty-ninth Congress, sec-
cond session and the latest map of the turning basin is in House
Document No. 180, Seventy-fifth Congress, first session.
   Local cooperation.-The work authorized by the River and Har-
bor Act of August 26, 1937, is subject to the condition that local
interests provide, free of cost to the United States, all lands and
rights-of-way necessary for the improvement and for its subsequent
maintenance when and as required, and to the further condition that
local interests provide, without cost to the United States, suitable
highway connections and a bulkhead along the south side of the
basin on plans approved by the Chief of Engineers, and agree to
maintain said bulkhead and the land approaches thereto as a public
terminal open to all on equal terms. All prior conditions of local
cooperation have been complied with except to provide suitable
spoil areas for maintenance dredging. The land required for con-
struction purposes under local cooperation applies to a total of ap-
proximately 124 miles, about one-third the length of the waterway.
   Terminal facilities.-Extensive terminals with railway and street
connections are available in connection with the harbors at Jackson-
ville and Miami. Terminals, with railway and highway connec-
tions, for coastwise vessels have been constructed at Fort Pierce
 (Indian River), Riviera (Lake Worth), and Port Everglades
 (Hollywood Harbor). Municipal piers or wharves have been con-
structed at Titusville, Cocoa, Melbourne, and Vero Beach for han-
dling general freight and at St. Augustine, Daytona Beach, New
Smyrna, Eau Gallie, West Palm Beach, and Miami for the use of
pleasure craft. There are also a number of privately owned piers,
wharves, and landings at various points along the waterway. The
facilities are considered adequate in general for the existing com-
merce. (For further details on facilities at Jacksonville and Miami,
see Port Series No. 8, revised Corps of Engineers.)
   Operations and results during fiscal year-Maintenance.-Under
contract for the construction of steel and concrete double-leaf bascule
highway bridge to replace the temporary pontoon highway bridge
near Palm Valley, Fla., work was commenced September. 10, 1936,
584     REPORT OF CHIEF OF ENGINEERS, U. S: ARMY, 1937

and was completed at the end of the fiscal year except for the elec-
trical work, the fender system, and other minor items of work. The
cost was $109,206.09 for maintenance. .Under a contract for main-
tenance dredging to restore project dimensions at a shoal at the
mouth of Hillsboro Canal, work was commenced August 11 and
completed August 15, 1936. There were removed 19,635 cubic yards
of material at a cost of $7,803.37. The U. S. pipe-line dredge
Congaree was employed from July 1 to October 30, 1936, and from
November 23, 1936, to February 10, 1937, in maintenance dredging
operations throughout the project as required. Project dimensions
were restored at 17 different localities between the St. Johns River
and Bakers Haulover in Biscayne Bay by the removel of 1,244,178
cubic yards of material. The cost was $93,091.51. The cost of sur-
veys and contingencies incidental to the supervision of the project
was $10 465.62.
   Operating and care.-The pontoon highway bridge near Palm
Valley, Fla., was operated and maintained throughout the year. A
total of 3,031 floating craft was passed through the bridge. The
cost was $3,966 48.
   The costs for the year were $220,566.59 for maintenance and
$3,966.48 for operating and care, a total of $224,533.07. The expendi-
tures were $218,601.46, all regular funds.
   Condition at end of fiscal year.-The existing project is 99.7 per-
cent completed. All work was completed in 1935 except the nrovi-
sion of the turning basin in the vicinity of Jacksonville Beach.
The construction of a steel and concrete double-leaf bascule highway
bridge near Palm Valley, Fla., to replace the temporary pontoon
highway bridge at that locality, has been completed except for the
fender system, electrical work, and other minor items. In June
1937, project depth of 8 feet at mean low water existed from the
St. Johns River to Melbourne and from Delray to Miami except at
five localities, which had controlling depths as follows: Ponce de
Leon Relocation Cut. 6.8 feet; Mosouito Lagoon, 7.5 feet; Hanlover
Canal, 7.9 feet; Indian River near Haulover Canal, 7.8 feet; Indian
River from Titusville to Cocoa, 7.9 feet: Project depth of 8 feet
existed from Melbourne to Fort Pierce in December 1936; from
Fort Pierce to Lake Worth in January 1937; and through Lake
Worth to Delray in February 1937. Project width of 100 feet is
reduced at a number of localities by bridges. The provision of a
turning basin in the vicinity of Jacksonville Beach remains to be
done to complete the project.
   Under regular funds the costs of the existing project have been
$5,051.605.99 for new work, $1,409,482.70 for maintenance, and
$8,935.85 for operating and care, a total of $6,470,024.54; the ex-
penditures have been $6,449,819.82. Under Public Works funds the
cost and expenditures have been $2,199,841.72 for new work. The
total cost of the existing project, all funds, has been $8,669,866.23, of
which $7.251,447.71 was for new work, $1,409,482.70 for maintenance,
and $8,935.85 for operating and care. The total expenditures have
been $8,6'9.661.54. In addition the sum of $3,179.07 was expended
between July 1, 1934 and June 30, 1935, on the operation and care
of the work of improvement under the provision of the permanent
indefinite appropriation for such purposes.
        RIVERS AND HARBORS-JACKSONVILLE,                    FLA., DISTRICT          585

  Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1937, together with an allotment of $103,500 made
during July 1937, a total of $138,039.22, will be applied as follows:
Accounts payable June 30, 1937_______--__-----------------------          $23, 356. 16
Mairtenance :
    Dredging with U. S. dredge Congaree, 6 months,
      October 1937-March 1938, remo ving shoals
      throughout project as required __---_--__-----_      $104, 589. 15
    Complete, during July 1{37, existing contract for
      construction of a permanent bridge near Palm
      Valley to replace the temporary pontoon bridge__         5, 793. 91
    Begin about Aug. 15, 1137, by contract, and com-
      plete Aug. 23, 1937, the removal of the temporary
      pontoon highway bridge near Palm Valley__---                800. 00

      Total for maintenance___-__       ___________----                      111, 183.06
Maintenance (operation and care throughout the year
of highway bridge over waterway at Palm Valley) :
   Operation ----------------------------                      $3, 100. 00
   Ordinary repairs ---------------------------------              200. 00
    Emergencies-------------------------------------               200. 00
                                                                                3, 500.00
       Total for all work_________ ____________------------138, 039. 22
  The additional sum of $173,500 can be profitably expended during
the fisoal year 1939 as follows:
New work: Execute, by contract, during the period February-April
  1939, the dredging required for an approach channel and turning
  basin in the' vicinity of Jacksonville Beach, Fla _________-----_--       $20,000
Maintenance: Dredging with U. S. dredge Congaree, 9 months, Septem-
  ber 1938-May 1939, removing shoals throughout the project as re-
  quired----------------------------------                                  150,000
Maintenance (operation and care throughout the year of high-
  way bridge over waterway at Palm Valley) :
    Operation -----------------------------------             -     $3, 100
    Ordinary repairs______________________________--                    225
    Emergencies---------------------------------------------            175
                                                                              3, 500
       Total for maintenance --------------------------------------              153, 500
       Total for all work-----------------------------------------               173, 500
                            Cost and financial summary
Cost of new work to June 30, 1937--------------------------            $7, 346, 222. 96
Cost of maintenance to June 30, 1937-----      __________               '21,634, 819. 87
      Total cost of permanent work to June 30, 1937---- _____              8, 981, 042. 83
Undistributed costs June 30, 1937        -------------------------              2, 809. 12
      Net total cost to June 30, 1937_-----------------____                8, 983, 851. 95
Plus accounts receivable June 30, 1937 -----------------------                     342. 32

      Gross total costs to June 30, 1937______________ ___                 8, 984, 194. 27
Minus accounts payable June 30, 1937 ______..      ________--                  23, 356. 16
     Net total expenditures----------------------------               1 28   969, 838. 11
Unexpended balance June 30, 1937--------------------------                    34, 196. 90
       Total amount appropriated to June 30, 1937-----------          12   8, 995, 035. 01
  1Includes $2,199,841.72 Public Works funds.
   Includes $3,179.07 from permanent indefinite appropriation.
586                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


Fiscal year ending June 30                      1933               1934             1935              1936              1937


Cost of new work---..------.......          $1, 574, 181. 02   $2, 768, 822. 93    $836, 322. 39    -$8, 163. 93       ---------
Cost of maintenance.......                      104, 313. 71       119, 482. 13     532, 233. 35     336, 004. 28      $224, 533. 07
         Total cost...-----------........    1, 678, 494. 73    2, 888, 305. 06   1, 368, 555. 74   332, 840. 35        224, 533. 07
Total expended............                   1, 411, 749. 62    2, 875, 212. 82   1,133, 013. 47    350, 142. 31        218, 604. 46
Allotted. .................                  2, 477, 152. 96    2, 589, 263. 62     270, 822. 27    487, 394. 68         23, 000. 00


Balance unexpended July 1, 1936 .--.       __   __ __                                                               $229, 801. 36
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_-------
                           _--- --   ----- __---_____                                                         -_     33,000. 00
      Amount to be accounted for _-----__-   -- _____-___--                                                         262, 801. 36
Deductions on account of revocation of allotment-------                                                               o10,
                                                                                                                         000. 00
      Net amount to be accounted for  -....                                                                          252, 801.36
Gross amount expended---------------------     $265, 449.87
Less reimbursements collected---- -___--__-- -   46, 845. 41
                                                                                                                     218, 604. 46
      Balance unexpended June 30, 1937___                                                                            34, 196. 90
Oustanding liabilities June 30, 1937------------                                        $23, 356. 16
Amount covered by uncompleted contracts-------                                            6, 318. 13
                                                                                                                     29, 674. 29

     Balance available June 30, 1937___                                                                                4, 522. 61
Accounts receivable June 30, 1937  __                                                                                     342. 32

     Unobligated balance available June 30, 1937_                                                                      4, 864. 93
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------   _--------------------                                                            103, 500. 00

      Balance available for fiscal year 1938___--     __      ___-----                                               108, 364. 93
Amount (estimated) required to -be       appropriated for com-
                                     -- --- --- ---- --- --- ---- ---
pletion of existing project ------                                                                                   20, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
        For new work __--------------                                                                                 20, 000.00
                                                 -
         For maintenance                                                                                             153, 500. 00

             Total8                                                                                                  173, 500. 00
    8 Exclusive          of available funds.

                                            7. MELBOURNE HARBOR, FLA.

  Location.-Melbourne Harbor occupies a small landlocked basin in
the mouth of Crane Creek, a small stream which empties into the
Indian River at Melbourne, Fla., 178.5 miles south of the St. Johns
River and 170.5 miles north of the turning basin at Miami Harbor.
(See U. S. Coast and Geodetic Survey Chart No. 845.)
  Existing project.-This provides for dredging a channel 100 feet
wide and 8 feet deep at mean low water from that depth in the Indian
River to and in Crane Creek, with a turning basin of the same depth
800 feet long and 400 feet wide at the inner end. There is little tidal
variation in that part of the Indian River, changes in water elevation
being due almost entirely to wind action.
  The estimate of cost of new work, made in 1935, is $12,000, with
$500 annually for maintenance. The existing project was adopted by
         RIVERS AND HARBORS-JACKSONVILLE,                    FLA., DISTRICT        587

the River and Harbor Act of August 26, 1937 (H. Doc. No. 390,
74th Cong., 2d sess.). The latest published map is in the project
document.
  Local cooperation.-The act which adopted the project imposed
the condition that local interests furnish, free of cost to the United
States, any lands needed for the improvement.
   Terminal facilities.-These consist of a municipal timber marginal
wharf about 250 feet long, a boat storage shed and ways, a small
pier and warehouse used by a freight-boat line, and several small
privately owned boathouses and docks. The facilities are adequate
for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done and no
costs or expenditures have been incurred. The controlling depth in
the entrance channel and turning basin previously provided by local
interests was 5.1 feet at mean low water in September 1935.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  The sum of $12,000 can be profitably expended during the fiscal
year 1939 to be applied to new-work dredging, by contract, during
August and September 1938 of an approach channel and a turning
basin in Crane Creek.
                             Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937
Net total expenditures_
Total amount appropriated to June 30, 1937__________________
Amount (estimated) required to be appropriated for completion of
  existing project---------------------                     ----------- ------- $12, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work---------------------------------------                      12, 000
                        8. FORT PIERCE HARBOR, FLA.

   Location.-Located on the east coast of Florida, about 213 miles
south of the entrance to St. Johns River and about 124 miles north
of the entrance to Miami Harbor. (See U. S. Coast and Geodetic
Survey Charts Nos. 1247 and 3259.)
   Existing project.-This contemplates the maintenance and the am-
plification of the project developed by private interests to provide
a channel 350 feet wide at the 27-foot contour in the ocean, tapering
to 200 feet wide at station 100, thence 200 feet wide to station 30,
thence flaring to a turning basin 750 feet in width, the depth to be
25 feet in the basin, and in the channel to station 130, and thence 27
feet deep to the 27-foot contour in the ocean. The entrance, as con-
structed by local interests, is protected by two parallel rubblestone
jetties with revetment extensions at their inner ends 900 feet apart,
the north jetty and revetment being about 3,500 feet long, and the
south jetty and revetment about 3,200 feet long. The mean range of
tide is about 2.6 feet at the entrance, and 0.7 foot at the terminal, with
northeast storm tides as high as 5 feet above mean low water.
   The estimate of cost for new work, revised in 1937, is $322,000.
The latest (1935) approved estimate of cost for annual maintenance
is $250,000 for initial restoration, $50,000 per year for a period of 4
years and $30,000 a year thereafter.
588      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The existing project was authorized as follows: The Deficiency
Act of March 4, 1931, carried an item for dredging at Fort Pierce
Harbor, Fla., as follows:
   Fort Pierce Harbor : For dredging the channel of Fort Pierce Harbor, Fla.,
fiscal years 1931 and 1932, $20,000; Provided, That no part of this sum shall
be expended until local interests shall have agreed to maintain such channel
upon completion of the dredging herein provided for.
  The War Department Appropriation Act approved March 4, 1933,
carried an item for dredging at Fort Pierce Harbor, Fla., as follows:
  Fort Pierce Harbor: For dredging the channel of Fort Pierce Harbor, Fla.,
$30 000, or so much thereof as may be necessary, to be immediately available.
    The maintenance of the channels, jetties, revetments, etc., was au-
thorized by the Public Works Administration on September 6, 1933
 (H. Doc. No. 252, 72d Cong., 1st sess.), and was subsequently adopted
by the River and Harbor Act of August 30, 1935, which included the
enlargement of the channels and turning basin to the existing dimen-
sions (Rivers and Harbors Committee Doc. No. 21, 74th Cong.
1st sess.). The latest published maps are in the last-mentioned
document.
    Local cooperation.-The work was authorized by the River and
Harbor Act of August 30, 1935, subject to the provision that local
interests convey to the United States, free of cost, all existing works
included in said project and a strip of land at least 50 feet wide on
each side of and along and bordering the waterway through the inlet
entirely across the barrier land strip between the Atlantic Ocean and
the Indian River, and provide suitable areas for disposal of dredged
material during initial restoration and future maintenance as and
when needed. All existing works included in the project and the
required strip of land on each side of the inlet, have been deeded to
the United States and local interests have agreed to furnish spoil
areas as and when required. All requirements have been fully com-
plied with.
    Terminal facilities.-These consist of two earth-filled piers re-
tained by steel sheet piling and enclosing a slip 200 feet wide by 330
to 350 feet long. These piers afford a berthing space of about 1,200
feet. A warehouse, 70 by 200 feet, is situated on the south pier and
a precooling plant, 105 by 363 feet, occupies the north pier, just land-
ward of which is another warehouse, 50 by 100 feet. The north pier
is served by railway and both piers by highway connections. Fur-
ther north there is tank storage for petroleum products. The facili-
ties are considered adequate for existing commerce.
    Operations and results during fiscal year.-Under a contract for
dredging to widen and deepen the channel at the inlet and across
Indian River and to enlarge and deepen the turning basin, all to
project dimensions, work was commenced July 26, 1936, and com-
pleted April 26, 1937. There were removed 1,246,355 cubic yards of
material at a cost of $190,236.91 for new work.
    The costs of a survey preliminary to new-work dredging on the
outer bar section, and of surveys and contingencies incidental to the
supervision of the project, were $2,859.98 for new work and $1,423.35
for maintenance.
        RIVERS AND HARBORS-JACKSONVILLE,                   FLA., DISTRICT    589
   The costs for the year were $193,096.89 for new work and $1,423.35
for maintenance, a total of $194,520.24. The expenditures were
$192,340.33, all regular funds.
   Condition at end of fiscal year.-The existing project is about 61
percent completed. Local interests have dredged a channel 3,200
feet long, 240 feet wide, and 25 feet deep from deep water in the
ocean to the shore line, but shoaling has taken place therein. The
22-foot deep channel which they dredged through the inlet and
across Indian River and the 22-foot deep turning basin have been
deepened to 25 feet and enlarged to project dimensions by the United
States. The rehabilitation of the jetties constructed by local inter-
ests was completed in 1934 and both jetties are now in good condi-
tion. The controlling depth in the outer bar section, in March 1937,
was 20 feet for a width of 200 feet, and in May 1937, project depth
of 25 feet for full project width existed throughout the remainder
of the entrance channel and in the turning basin. The work remain-
ing to be done to complete the project is the widening of the outer
bar section of the entrance channel and its deepening to 27 feet under
an existing contract under which work will be commenced at an
early date.
   Under regular funds the costs of the existing project have been
$197,044.44 for new work and $122,401.15 for maintenance, a total
of $319,445.59, and the expenditures have been $317,318.16. Under
Public Works funds the cost and expenditures have been $250,000 for
maintenance. The total cost, all funds, has been $569,445.59, of
which $197,044.44 was for new work and $372,401.15 for mainte-
nance. The total expenditures have been $567,318.16.
   Proposed operations.-The balance unexpended on July 1, 1937
($151,021.80), will be applied as follows:
Accounts payable June 30, 1937__________________________________  $2, 202. 76
New work: Begin during September 1937, by contract, and com-
plete during December 1937 the dredging required to complete
  the project, consisting of widening and deepening the 27-foot
entrance channel___________-----------------------              148, 819. 04

      Total for all work---------------------------------------      151, 021. S0
  The additional sum of $50,000 can be profitably expended during
the fiscal year 1939 as follows:
Maintenance :
   Dredging     with U. S. hopper dredge Absecon in bar cut and in
      channel   between the jetties, August-September 1938____________ $20, C00
   Dredging     by contract, in channel across the Indian River and in
      turning   basin, 2 months, March-April 1939_________________ ___ 30, 0)0

          Total for maintenance -----------------------------------       50, 00

                           Cost and financial summary

Cost of new work to June 30, 1937 ___________________-_______ $197, 044. 44
Cost of maintenance to June 30, 1937-------------________-__  1372, 401. 15

      Total cost of permanent work to June 30, 1937_____________     569, 445 59
Undistributed costs June 30, 1937---________________________               75. 33

       Net total cost to June 30, 1937- ------          -----      - 569, 520. 92
1 Includes $250.000 Public Works funds.
590               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937__                                              __             ___        __          $2, 202. 76

     Net total expenditures-------------------------                                                               -     567, 318. 16
Unexpended balance June 30, 1937 -------  11111111111                                                                    151, 021. 80
            Total amount appropriated to June 30, 1937---------__-                                                       718, 339. 96

     Fiscal year ending June 30                          1933              1934             1935            1936              1937

Cost of new work_.-----..                          .--------
                                                  _.-..         -------------         _    $1, 005. 51     $2,942.04        $193, 096. 89
Cost of maintenance------------.............         $14, 112. 93       $175, 699. 80     133, 971. 46     25, 647. 81         1, 423. 35

        Total cost.......-------------.........        14, 112. 93      175, 699. 80      134, 976. 97     28, 589. 85       194, 520. 24

Total expended--........---------.........              4, 905. 85      135, 509. 20      183, 744. 65     30, 788. 13       192, 340. 33

Allotted--------.........................              29,994.16        299, 800. 00      44, 000. 00     193, 545.80        131,000. 00


Balance unexpended July 1, 1936_--- __----                ---_______----- $212, 362. 13
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936      ..------- -----------------------------          131, 000. 00

Amount to be accounted for--------------------------------343,                                                             362. 13
Gross amount expended                                                                               1------__-------------
                                                                                                   $192,917.60
Less reimbursements collected-       ----_--              ---                                             577. 27
                                                                                                                      192, 340. 33

      Balance unexpended June 30, 1937_-----------------                                                                 151, 021. 80
Outstanding liabilities June 30, 1937___ ------    $2, 202. 76
Amount covered by uncompleted contracts---------- 148,819. 04
                                                                                                                         151, 021. 80
Amount that can be profitably expended in fiscal year ending
                                  _-    -- -- - -- -- - - -- -
June 30, 1939, for maintenance 2_ _ __                        _                                                          50, 000. 00
   s Exclusive of available funds.

                                            9. LAKE WORTH INLET, FLA.

    Location.---Located on the east coast of Florida about 71 miles
north of the entrance to Miami Harbor and is the entrance channel
to the Port of Palm Beach. (See U. S. Coast and Geodetic Survey
Charts Nos. 1248 and 3260.)
    Existing project.-This contemplates the maintenance and ampli-
fication of the improvements constructed by local interests to pro-
vide a channel 20 feet deep and 200 feet wide from the turning basin
to station 65+00, thence flaring to a width of 300 feet at station
69+00, thence 300 feet wide to deep water in the ocean; for enlarg-
ing the present turning basin to the eastward; for the removal of
the obstructive point on the south side of the inlet; for the revet-
ment of the banks of the inlet; and for restoration of the existing
jetties. The jetties constructed at the entrance by local interests
consist of two parallel rubblestone structures 800 feet apart, the
north jetty and revetment being about 1,800 feet long and the south
jetty 1,700 feet long. The mean range of tide is 2.8 feet at the
inlet and 1.8 feet at the Port of Palm Beach terminals.
    The estimate of cost for new work, made in 1935, is $548,000.
The latest (1935) approved estimate of cost for annual maintenance
is $30,000.
      RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT            591
   The existing project was authorized as follows: The maintenance
of the improvement, as constructed by local interests, was author-
ized by the Public Works Administration on March 13, 1934 (H.
Doc. No. 185, 73d Cong., 2d sess.); the deepening of the channels
and turning basin, as constructed by local interests, to 20 feet was
approved by the Public Works Administration on December 10,
1934, in accordance with recommendations of the Chief of En-
gineers to the Public Works Administration October 17, 1934; and
the River and Harbor Act of August 30, 1935, authorized the work
previously approved by the Public Works Administration and in
addition authorized the widening of the channels to the existing
project dimensions, the enlargement of the turning basin, the re-
moval of the obstructive point on the south side of the inlet, the
revetment of the banks of the inlet, and the restoration of the ex-
isting jetties (H. Doc. No. 185, 73d Cong., 2d sess., and Rivers and
Harbors Committee Doc. No. 42, 74th Cong., 1st sess.). The latest
published maps are in the last-mentioned document.
   Local cooperation.-The authorized work is subject to the condi-
tion that local interests furnish, free of cost to the United States,
all lands needed for the disposal of dredged material and for the
improvement, including title to the jetties and easements over strips
of land adjacent to the channel through the inlet, which lie channel-
ward of due east and west lines passing approximately 100 feet
landward of the shore ends of the jetties. It is also stipulated that
they shall provide a suitable site at the terminals for a Government
depot for use in the maintenance of the waterways in the locality.
A depot site has been deeded to the United States, and spoil areas
have been provided as required. The other conditions have not
been fully complied with.
   Terminal facilities.-These consist of a slip 690 feet long and 210
feet wide and 16 or more feet deep, with a steel warehouse 68 feet
by 3021/2 feet on the north side. A precooling plant 36 feet by
124 feet has been constructed north of the steel warehouse. Two
nearby storage depots for petroleum products are connected with
the terminals by pipe lines. Rail and highway connections, water
supply, and other facilities have been provided to the warehouse
and shipside. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 20 feet involving the widening of the channel
at the inlet and across Lake Worth and the enlargement of the turn-
ing basin, all to project dimensions, work was commenced August 4,
1936, and was 81 percent completed at the close of the fiscal year.
A total of 202,940 cubic yards of material was removed at a cost of
$176,772.99 for new work.
   Under a contract for the repair and restoration of the jetties and
revetments, as constructed by local interests, including additional
revetment construction, and the removal of the obstructive land point
on the south side of the inlet, work was commenced October 29, 1936,
and at the close of the fiscal year was about 40 percent completed.


     20106--37-pt. 1-   38
  592     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The repair of the north revetment, 1,450 feet long, was completed for
   a distance of 1,350 linear feet; the repair of the north jetty, 950 feet
  long, was completed for a distance of 850 linear feet, including the
   placing of concrete cap; and the removal of the south land point was
  commenced. The cost was $108,860.90 for new work.
      The U. S. seagoing hopper dredge Absecon was employed from
   October 23 to November 14, 1936, in maintenance dredging to a depth
  of 20 feet on the outer bar section, removing 96,254 cubic yards, bin
  measurement, of material at a cost of $15,273.51. The U. S. seagoing
  hopper dredge Comstock was employed from February 2 to Febru-
  ary 6, 1937, and the U. S. hopper dredge Absecon from February 16
  to March 10, 1937, in maintenance dredging to a depth of 20 feet in
  the 150-foot wide channel across Lake Worth near its eastern or sea
  end, removing 87,422 cubic yards, bin measurement, of material at
  a cost of $20,63.7 6. The cost of preliminary surveys and contingen-
  cies incidental to the supervision of the project was $1,202.57 for new
  work and $2,173.99 for maintenance.
     The costs for the year were $286,836.46 for new work and
 $38,101.26 for maintenance, a total of $324,937.72. The expenditures
were $222,803.58, all regular funds.
     Condition at end of fiscal year.-The existing project is about 69
percent completed. The entrance channel, as originally dredged by
local interests, has been completed by the United States to a depth
of 20 feet for a width of 300 feet from deep water in the ocean to
the easterly end of the inlet, a distance of about 1,900 feet, and thence
150 feet wide through the inlet and across Lake Worth to the turning
basin, a distance of approximately 2,600 feet; the widening of the
channel across Lake Worth and at the inlet to project width is in
progress; the turning basin, as dredged by local interests, has been
deepened and enlarged to project dimensions, these being 700 feet
wide for a distance of 700 feet and thence converging in a distance
of about 850 feet to a width of 200 feet at its junction with the chan-
nel; the rehabilitation of the jetties and revetments, as constructed
by local interests, and new revetment construction are in progress
and are about 40 percent completed. The controlling dimensions in
June 1937 were: Outer bar, 20 feet for a width of 300 feet; channel
between revetments and across Lake Worth, 19.9 feet for a width of
100 feet; in the turning basin, plroiect dimensions existed except for
a shoal about 50 feet wide extending along the southeasterly side.
The work remaining to be done to complete the project is the com-
pletion of the widening of the channel at the inlet to 300 feet to sta-
tion 69+00 and thence to 200 feet across Lake Worth to the turning
basin, the removal of the obstructive point on the south side of the
inlet, and the completion of the revetment of the banks of the inlet,
and of the restoration of the existing jetties, all under existing
contracts.
    TTnRaor regular funds the costs of the existing project have been
,O79    ~7'575 for new work and $85,069.03 for maintenance, a total of
$382. 64.78. and the expenditures have been $280.655 91. Under Pub-
lic wVrrlrs fin, the costs and expenditures hliav been $ 0.000 for new
worln and $.30.000 for mantnarnce, a total of 110.000. The total cost,
all func s. hRas hoon $493.864.78. of which $378.795.75 was for new
worl     nd 9115.069.03 for maintenance. The total expenditures have
been $390,655.91.
          "RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                                                                593
  Proposed operations.--The balance unexpended and accounts re-
ceivable July 1, 1937, together with an allotment of $30,000 made
during July 1937, a total of $328,194.25, will be applied as follows:
Accounts payable June 30, 1937 ------  ---------------------  $103,863. 73
New work:
   Complete, during September 1937, existing contract
     for widening the channel at inner end of the
     entrance, across Lake Worth, and the enlarge-
     ment of the turning basin________--__--------    $45, 724.37
   Complete, during May 1938, existing contract for
     the repair of the jetties and the revetments,
     and the removal cf the south land point-------- 153, 942. 56
       Total for new work_---         __-___________________                                                     199, 666. 93
Maintenance: dredging with U. S. hopper dredge Absecon in the
bar cut and in the channel across Lake Worth, 11/2 months,
March-April 1938      -------------------------------------                                                      24, C63. 59
         Total for all work_                            ---                            -328,                          194. 25
  The additional sum of $30,000 can be profitably expended during
the fiscal year 1939 in maintenance dredging with U. S. hopper
dredge Absecon in the bar cut and in the channel across Lake Worth,
2 months, September-October 1938.
                                 *           Cost and financial summary

Cost of new work to June 30, 1937_____---_________________                                                      $378, 795. 75
Cost of maintenance to June 30, 1937-----____--__________                                                       2 115, 039. 03

      Total cost of permanent work to June 30, 1937                                        ----------            493, 864. 78
Undistributed costs June 30, 1937--_____---________                                                                   635. 10

      Net total cost to June 30, 1937--------------------------494, 499. 91
Plus accounts receivable June 30, 1937                     ___       19. 70

     Gross total costs to June 30, 1937---------------- ___                                                      494, 519. 61
Minus accounts payable June 30, 1937------------------------                                                     103, 83. 73

     Net total expenditures _________-------390,                                                                      655.91
Unexpended balance June 30, 1937-----------------------------298,                                                     174. 55
         Total amount appropriated to June 30, 1937--------------                                                688, 830.46

   Fiscal year ending June 30                    1933                1934           1935           1936               1937


Cost of new work .._       _- ..-----........                 _...-------         $80, 182. 94   $10, 119. 70       $286, 836. 46
                     .....
Cost of maintenance________  -___-.           .......             $31, 086. 77     20, 699. 75    26, 837. 90         38, 101. 26
      Total cost.....--------------------.              ..          31, 086. 77   100,882. 69     36, 957. 60        324, 937. 72
Total expended___          _------------------                      29, 126. 24    95, 578. 46    43, 147. 63        222, 803. 58
Allotted-----------       ----           ------------               60, 000. 00    98, 000. 00   458, 491. 50         72, 338. 96


Balance unexpended July 1, 1936 -----------------------------                                                   $448, 639. 17
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 _________-------  -$2, 838. 96
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936______________         69, 500. 00
                                                                                                                  72, 338. 96
        Amount to be accounted for-------,_           --                   520, 978. 13
   2Includes $80,000 Public Works funds, and $1,656.65 transferred from maintenance to
new wok.
  . Includes $30,000 Public Works fundu.
594       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended------------------------     $223, 280. 01
Less reimbursements collected                             476. 43
                                              --_-----------------
                                                                         $222, 803. 58
      Balance unexpended June 30, 1937_--____--- ---                     298, 174. 55
Outstanding liabilities June 30, 1937---__-----_ --- 103, 863. 73
Amount covered by uncompleted contracts----------194, 330. 52
                                                                          298, 194. 25

     Balance available June 30, 1937-- __-----------             -----    --   19. 70
Accounts receivable June 30, 1937_--   -----------------------
                                         _                                     19. 70

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_-------- ____------------------                  -30, 000. 00
     Balance available for fiscal year 1938________ ___----30,                000. 00

Amount that can be profitably expended in fiscal year ending
                                8 -   -
June 30, 1939, for maintenance     ___________________    _              30, 000. 00
  SExclusive of available funds.

         10. HOLLYWOOD HARBOR (PORT EVERGLADES), FLA.

    Location.-Located on the east coast of Florida, about 23 miles
north of Miami and about 48 miles south of Lake Worth Inlet
 (West Palm Beach). The site of the harbor is at Lake Mabel. (See
U. S. Coast and Geodetic Survey Charts Nos. 546, 847, and 1248.)
    Existing project.-This contemplates the maintenance and ampli-
fication of the project as originally constructed by local interests to
provide a channel 500 feet wide at its seaward end, converging to 400
feet at the jetty entrance, thence converging to 300 feet at a point
1,000.feet within the jetty entrance, and thence 300 feet to the exist-
ing turning basin, and for the completion of the turning basin to
1,200 feet square, all to a depth of 35 feet. The channel dredged
by local interests is protected by two converging, angular stone
jetties constructed at the entrance, 500 feet apart at the outer ends
and 1,200 feet, apart and parallel for a distance of 800 feet at the
shore ends. The north jetty is about 1,450, and the south jetty 1,250
feet in length. Both jetties were built to 6 feet above mean low
water with top widths of 6 feet at the shore ends and 12 feet at the
seal ends, and with side slopes 1 on 11/2. Two parallel steel-sheet
piling bulkheads, 800 feet apart, protect the land points from ero-
sion. The mean range of tide is 2.6 feet at the entrance and 2.3 feet
at the terminals; the spring range is 3 feet at the entrance.
    The estimate of cost for new work, made in 1935, is $1,134,000.
The latest (1935) approved estimate of cost for annual maintenance
is $35,000.
   The River and Harbor Act approved July 3, 1930, authorized the
maintenance of the harbor as constructed by local interests (H. Doc.
No. 357, 71st Cong., 2d sess.); and the River and Harbor Act of
August 30, 1935, provided for the enlargement of the entrance chan-
nel and turning basin to the existing project dimensions (Rivers
and Harbors Committee Doc. No. 25, 74th Cong., 1st sess.). The
latest published map is in the latter document.
   Local cooperation.-The improvement authorized by the River
and Harbor Act of August 30, 1935, is subject to the condition that
local interests provide suitable areas for the disposal of dredged
material during construction and subsequent maintenance. Spoil
areas for construction have been furnished.
        RIVERS AND HARBORS-JACKSONVILLE,                   FLA., DISTRICT      595
   Terminal facilities.-These consist of one slip about 1,200 feet long
by 300 feet wide, with steel bulkhead at the end and both sides, pro-
viding about 2,700 feet of berthing space, with a depth of 35 feet.
A steel warehouse and a precooling plant have been built, with rail-
way and highway connections. Equipment for the transfer of rail-
road freight cars to and from car ferries has been installed. Two
nearby tank storage depots for petroleum products are connected
with the terminals by pipe lines. The facilities are considered ade-
quate for present needs, though extensive additions are contem-
plated.
   Operations and results during fiscal year.--Under a contract for
dredging to complete the turning basin to 1,200 feet square to a
depth of 30 feet, work was commenced December 3, 1933, and com-
pleted May 24, 1937. There were removed 378,972 cubic yards of
material at a cost of $240,144.21 for new work. The cost of hired-
labor surveys preliminary to this dredging and of surveys and con-
tingencies incidental to the supervision of the project was $970.82
for new work and $17.67 for maintenance.
   The costs for the year were $241,115.03 for new work and $17.67
for maintenance, a total of $241,132.70. The total expenditures
were $174,621.55.
   Condition at end of fiscal year.-The existing project is about 22
percent completed. Local interests have constructed an entrance
channel 210 feet wide, 35 feet deep, and about 6,900 feet long, lead-
ing from the ocean to the turning basin, and have constructed two
converging angular jetties to protect the entrance channel. The
United States has completed the turning basin dredged by local
interests to 1,200 feet square and to a minimum depth of 30 feet.
The repair of the north and south jetties was completed in the cal-
endar year 1932, and both jetties are now in fair condition. The
controlling dimensions at mean low water were 31.5 feet deep for a
width of 200 feet in the entrance channel in September 1936, and
30.5 feet deep for an area 1,200 feet square in the turning basin in
May 1937. The work remaining to be done to complete the project
is the enlargement of the entrance channel to project width and
completing the deepening of the entire improvement to 35 feet.
   The costs of the existing project have been $247,122.88 for new
work and $92,466.63 for maintenance, a total of $339,589.51. The
total expenditures have been $273,078.36.
   Proposed operations.-The balance unexpended on July 1, 1937,
together with an allotment of $940,000 made during July 1937, less
$10,000 revoked during August 1937, plus an allotment of $91,000
to be made later, a total of $1,106,378.45 will be applied as follows:
Accounts payable June 30, 1937----------      ____          _____--
                                                         ----           $67, 177. 04
New work:
   After-dredging surveys, computations and incidentals per-
     taining to contract completed during June 1930 for deepen-
      ing the turning basin to a depth of 30 feet----------------         5, 201.41
    Begin during November 1937, by contract, and complete dur-
      ing December 1938, the dredging required to provide a
      depth of 35 feet throughout the project____--___            --
                                                                ____ 1, 034, 000. 00
           Total for new work-       -    _-_____-                    1,106, 378. 45
596              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The additional sum of $50,000 can be profitably expended during
the fiscal year 1939 to be applied to maintenance involving the re-
pair of the jetties, by contract, during the period December 1938-
March 1939.
                                                  Cost and financial summary

Cost of new work to June 30, 1937_ _ __________---------____                                                               $247, 122. 88
Cost of maintenance to June 30, 1937_ _---
                                       _-_                 _                                                                 92, 466. 63

      Total cost of permanent work to June 30, 1937 .   _ _                                                 -       _        339, 589. 51
Undistributed costs June 30, 1937_______    _______________                                                                       665. 89

           Net total cost to June 30. 1937 _                                                    _--------                    340. 255. 40
Minus accounts payable June 30, 1937---------------------------                                                                  67, 177. 04

     Net total expenditures-----------------------------------                                                              273, 078. 36
                                ------------------------ ___
Unexpended balance June 30, 1937__                                                                                           85, 378. 45

           Total amount appropriated to June 30, 1937---------------                                                        358, 456 81

           Fiscal year ending June 30                                 1933          1934          1935             1936              1937


Cost of new work________     _______ __                              __----    __-  ..          $5,983.71           $24.14        $241,115. 03
Cost of maintenance ______.____________
                     ..                                          _ $17, 222. 04 $13, 962. 07    30, 294. 80      ---------              17. 67

        Total cost_----------           ------------                17, 222. 04   13, 962. 07   36, 278. 51             24. 14     241, 132. 70

Total expended___...._--------------__            ____       __     21, 953. 12    7, 461. 12   40, 910. 44       1, 893. 16       174, 621. 55

Allotted .______---......------........----
                                        .....__          ...._     -4, 807. 91    44, 904. 80   15, 000. 00     -9, 640. 08        260, 000. 00


Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936---------------------------------------       $260, 000.00
Gross amount expended---------------------------$174,658.68
Less reimbursements collected-----------------------        37. 13
                                                                                                                             174, 621. 55

      Balance unexpended June 30, 1937               _ _________--                                                               85, 378. 45
Outstanding liabilities June 30, 1937---------------- $67, 177. 04
Amount covered by uncompleted contracts         ___        3, 201. 41
                                                                                                                                 70, 378. 45

     Balance available June 30, 1937--------------------------                                                                   15, 000. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------_----------------------_ ---------                                                            940, 000. 00

           Balance available for fiscal year 1938--------------------                                                        955, 000. 00
Amount (estimated) required to be appropriated for completion of
existing project ----------------------------------------------                                                                 91, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ------------------------------------                                                                  50, 000. 00
1 Exclusive of available funds.
                            11. MIAMI HARBOR                               (BISCAYNE BAY), FLA.

  Location.-Biscayne Bay is a large, shallow, salt-water sound lying
between the Florida Keys and the mainland on the east coast of
Florida near the southern extremity of the peninsula. (See U. S.
Coast and Geodetic Survey Charts Nos. 547, 583, 847, and 1248.)
  Existing project.-This provides for a channel 30 feet deep at
mean low water and 500 feet wide from that depth in the ocean o
       RIVERS AND    HARBORS-JACKSONVILLE,       FLA., DISTRICT   597
  near the outer end of the north jetty, thence 300 feet wide through
the entrance and across Biscayne Bay to the turning basin in front
of the municipal terminals at Miami, enlarging the turning basin, the
southerly boundary of which is to be in prolongation of the south
edge of the 30-foot slip to be dredged by the city of Miami, and for
two parallel rubblestone jetties, 1,000 feet apart, the north one to
be 3,000 feet long and the south one 2,750 feet long. The present
approved dimensions for the turning basin are 1,400 feet from the
west end of Biscayne Bay Channel to the terminals, and 1,350 feet
in width. The total length of the waterway under improvement
is about 6 miles.
    The mean tidal variation is 2.5 feet at the entrance and 1.4 feet
in the bay. The extreme variation is about 3.5 feet at the entrance
and 2.4 feet in the bay. Strong easterly winds raise the water level
about 1.5 feet at the entrance and 1 foot in the bay. Strong westerly
winds lower the water level about 1 foot at the entrance and about
0.5 foot in the bay.
    The estimate of cost for new work, revised in 1937, is $7,004,000.
The latest (1937) approved estimate for annual cost of maintenance
is $80,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for an 18-foot chan-
nel in a land cut across the peninsula and for construction of the
north jetty (H. Doc. No. 662, 56th Cong., 1st sess.); act of March
2. 1907, authorized the construction of the south jetty and fixed the
width of the channel at 100 feet; act of July 25, 1912, provided
for enlarging the channel to 20 feet deep and 300 feet wide, and
for extension of the jetties (H. Doc. No. 554, 62d Cong., 2d sess.);
act of March 3, 1925, provided for deepening the channels to 25
feet at mean low water for the present widths at the entrance and
a width of 200 feet across Biscayne Bay (H. Doe. No. 516, 67th
Cong., 4th sess.): act of July 3, 1930, provided for a width of
300 feet in the channel across the bay and enlarging the municipal
turning basin, but limited expenditures thereon to $200,000 (Rivers
and Harbors Committee Doe. No. 15, 71st Cong., 2d sess.) ; the Public
Works Administration on January 3, 1934, and the River and Harbor
Act of August 30, 1935, authorized a depth of 30 feet in the channel
from the ocean to and in the turning basin, with the existing au-
thorized project widths, including a width of 300 feet in the chan-
nel across the bay (Senate Committee Print, 73d Cong., 2d sess.) ;
and the act of August 26, 1937, provided for extending the turning
basin 200 feet to the southward (Rivers and Harbors Committee
Doe. No. 86, 74th Cong., 2d sess.). The latest published maps are
in the two last-mentioned documents.
   Local cooperation.-The work included in the Public Works pro-
gram and adopted by River and Harbor Act of August 30, 1935, is
subject to the provision that local interests furnish satisfactory
assurances that suitable and sufficient slips and berths adequate for
the full utilization of the increased depth will be provided at the
terminals at Miami. The required assurance was given by resolution
adopted by the commission of the city of Miami, and accepted by the
Secretary of War January 25, 1934, as complying with the terms and
598     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

conditions of the required local cooperation. The required addi-
tional facilities are being constructed. All prior requirements have
been complied with.
   Terminal facilities.-There are three municipal piers, with ample
warehouse space, and depths of 28 to 30 feet of water and one
municipal open wharf, with a controlling depth of 14 feet in the
slip, these have an aggregate berthing space of about 7,256 feet.
The piers have railway and highway connections, while the wharf
has highway connections only. Two of the piers have been leased
to steamship companies. The others are open to the public. There
are 10 other wharves having a total berthing space of about 4,250
feet, 7 with 18 to 25 feet, and 2 with 10 to 13 feet of water. In
addition to these, 6,250 feet of berthing space have been completed
on Terminal Island, 2,250 feet having 25 feet and 4,000 feet having 18
feet of water. A municipal yacht anchorage with a depth of 16 feet
and a municipal yacht basin have been constructed for the use of
pleasure craft. The facilities are inadequate for present needs from
4 to 5 winter months each year, but are adequate for the remainder
of the time. (See Port Series No. 8, Part 2, revised 1936, Corps of
Engineers.)
   Operations and results during fiscal year-Regular funds.-The
cost of the care and preservation of the United States reservation at
Miami Beach and of surveys and contingencies incidental to the
supervision of the project was $21,469.08 for maintenance. The ex-
penditures were $18,756.14.
   Public Works funds.--There were no operations. The costs and
expenditures occasioned by the settlement of claim for the remis-
sion of liquidated damages were $1,001.57 for new work.
   The costs for the year, all funds, were $1,001.57 for new work and
$21,469.08 for maintenance, a total of $22,470.65. The total expendi-
tures were $19,757.71.
    Condition at end of fiscal year.-The existing project is 84 percent
completed. The jetties were completed during the calendar year 1929
and the dredging was completed during the calendar year 1935, ex-
cept the widening of the channel across Biscayne Bay to 300 feet,
arid the extension of the turning basin 200 feet to the southward.
A small amount of the latter work has been accomplished by the city
of Miami. The total length of the completed north jetty and revet-
ment is 4,688 feet, and the completed south jetty and revetment, 3,850
feet. The two rubblestone jetties and revetments at the entrance are
in fair condition. The project depth of 30 feet at mean low water
exists throughout the improvement for the full contemplated widths
except that the channel across Biscayne Bay is only 200 feet wide,
and the turning basin is only 1,150 feet wide; widening of this chan-
nel to 300 feet and of the turning basin to 1,350 feet remain to be done
to complete the existing project.
    Under regular funds the costs have been $3,701,798.69 for new work
and $1,234,878.69 for maintenance, a total of $4,936,677.38, and the
expenditures have been $4,967,314.63. Under Public Works funds
the cost and expenditures have been $2,202,126.04 for new work.
The total cost, all funds, has been $7,138,803.42, of which $5,903,924.73
was for new work and $1,234,878.69 for maintenance. The total ex-
penditures have been $7,169,440.67.
          RIVERS AND HARBORS-JACKSONVILLE,                                                 FLA., DISTRICT                      599
  Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1937, together with allotments of $806,000 made
during July 1937, a total of $812,045.82, will be applied as follows:
Accounts payable June 30, 1937----------------------------                                                             $4, 812. 69
New work: Begin during November 1937, by contract, and com-
  plete during November 1938, the dredging required to widen to
  300 feet the 30-foot ship channel across Biscayne Bay --------                                                      800, 000. 00
Maintenance :
    Care and preservation of the reservation ,--------$6, 000.00
    Periodic and miscellaneous surveys          ------------ 1, 233.13

             Total for maintenance----------------------------                                                           7, 233.13

             Total for all work----------------------------                                                 --        812, 045. 82
  The additional sum of $386,000 can be profitably expended during
the fiscal year 1939 as follows:
New work: Begin during August 1938 and complete during Jan-
uary 1939, by contract, the dredging required to widen the turn-
ing basin approximately 200 feet on the southerly side--------- $300, 000. 00
Maintenance:
   Repair, by contract, during July-August 1938, the
      damaged portions of the jetties------------         $40, 000
   Dredging with a United States hopper dredge through-
      out the channels of the project as required, Jan-
      uary-February 1939__,_-_____-----__--------          40, 000
   Care and preservation of the reservation-----------      6, 000

             Total for maintenance----------------------------                                                         86, 000. 00

             Total for all work ------------------------------
                                   _                                                                                  386, 000. 00

                                       Cost and financial summary
                             MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937       --------------------
                                               __                                                                  $3, 701, 798. 69
Cost of maintenance to June 30, 1937 ---------------------                                                          1, 234, 878. 69
      Total cost of permanent work to June 30, 1937 .---------                                                      4, 936, 677.38
Undistributed costs June 30, 1937 _______------___-__                                                                   29, 558.95
      Net total cost to June 30, 1937-----------------------                                                        4, 966, 236. 33
Plus accounts receivable June 30, 1937___ _________--- _____                                                   -         5, 890. 99
     Gross total costs to June 30, 1937 ----__-______-                                                              4, 972, 127.32
Minus accounts payable June 30, 1937 ________________-----
                                                    -                                                                    4, 812.69
     Net total expenditures----         -----------------------                                                     4, 967, 314. 63
Unexpended balance June 30, 1937--------------------_______________________                                                 154. 83
        Total amount appropriated to June 30, 1937_-------_-                                                        4, 967, 469.46

   Fiscal year ending June 30                1933            1934                1935                   1936               1937


Cost of new work        _---------------    -$900. 00      $14, 644.79    ......--         ..--------..............
Cost of maintenance   _____--______          3, 684. 42    243, 461. 98              $919. 27        $14, 779. 50         $21, 469. 08
     Total cost----------------              2, 784. 42    258, 106. 77               919. 27         14, 779. 50          21, 469. 08
Total expended.--              -_____--------17, 224. 82   278, 418. 90      -9, 655. 75                2,109. 74          18, 756. 14
Allotted_----------------------            -2, 175. 71     282, 395. 82        23, 706. 62         -- 12, 000. 00        -16, 500. 00
600                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936___                                                    __________                            $35, 410. 97
Deductions on account of revocation of allotment ._____                                                   __._                16, 500. 00

      Net amount to be accounted for_                                                                                         18, 910. 97
Gross amount expended---------------------------                                                    $50, 505. 21
Less reimbursements collected_____________________                                                   31, 749. 07
                                                                                                                              18, 756. 14

      Balance unexpended June 30, 1937_                                                                                           154. 83
Outstanding liabilities June 30, 1937_                                                                                         4, 812. 69

     Balance available June 30, 1937_                                                                                       -4,      657. 86
Accounts receivable June 30, 1937_                                                                                                5, 890. 99

     Unobligated balance available June 30, 1937 _ -______-       1, 233.13
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_-----------_____________            -__ 806, 000. 00
     Balance available for fiscal year 1938_.-. __ __---.--                                                                 807, 233. 13
Amount (estimated) required to be appropriated for completion
of existing project 1__--                                                                                                  300, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
        For new work 1_--- _________________________---__--                                                                 300, 000.00
        For maintenance 1------------------------------------------                                                          86, 000. 00
             Total 1 - - - -        -- ----- - -- --- -- --- -- -- --- -- -                                                 3 86 . 0 0 0 . 00


    1Exclusive of available funds.
                                                      PUBLIC          WORKS       FUNDS

Cost of new work to June 30, 1937-------                                                 --- _________ $2, 202, 126. 04
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937__--__                                                              2, 202,126. 04
Net total expenditures_____________________                                                                            2, 202, 126. 04
Total amount appropriated to June 30, 1937______-- ___________                                                         2, 202, 126. 04

   Fiscal year ending June 30                       1933                 1934                1935              1936                  1937


Cost of new work               --------------
                     ......------                              --    $361, 175. 89'    $1, 463, 636. 97     $376, 311. 61          $1, 001. 57
Cost of maintenance ..-             I....------------                                                                        ------
Total expended...------........--------------                         270, 334. 75      1, 438, 919. 30      491, 870. 42             1,001. 57
Allotted-....----------------------............   ----------        2, 202, 126. 04       .......         ......            ......    ......



Balance unexpended July 1, 1936_---- ------------------ ______ $1, 001. 57
Gross amount expended--___       ____________________        _1,1--001. 57
           CONSOLIDATED                 COST      AND FINANCIAL            SUMMARY           FOR    MIAMI      HARBOR,        FLA.


Cost of new work to June 30, 1937_------------------------- $5, 903, 924. 73
Cost of maintenance to June 30, 1937_ _______1__---______ 1, 234, 878. 69

             Total cost of permanent work to June 30, 1937 _--__--_                                                    7, 138, 803. 42
Undistributed costs June 30, 1937-------------__------------                                                       _          29, 558. 95

      Net total cost to June 30, 1937_________________                                                             _   7, 168, 362. 37
Plus accounts receivable June 30, 1937_--___-___-----------                                                        _        5, 890. 99

             Gross total costs to June 30, 1937____                                    _____________                   7, 174, 253. 36
           RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                                                                           601
Minus accounts payable June 30, 1937_                                     ---                  _-----------                   $1, 812. 69

     Net total expenditures_ _ _____-                                         _________7---------,                           169, 440. 67
Unexpended balance June 30, 1937 -- ___                                         ---------------------                             154. 83

         Total amount appropriated to June 30, 1937_-----------                                                          7, 169, 535. 50

  Fiscal year ending June 30                 1933                1934                   1935                    1936              1937


Cost of new work ..      ... __.
                      ___--                 -$900.00         $375, 820. 68          $1,463, 636. 97      $376, 311. 61            $1, 001. 57
Cost of maintenance....-----------           3, 684. 42       243, 461.98                   919. 27        14, 779. 50            21, 469. 08

      Total cost_--------------              2, 784. 42        619, 282. 66          1, 464, 556. 24          391, 091. 11        22, 470. 65

Total expended.............--.              17, 224. 82        548, 753. 65          1, 429, 263. 55          493, 980. 16        19, 757. 71

Allotted...-------------------.            -2,175. 71       2,484, 521.86               23,706.62         -12,000.00            -16,500.00


Balance unexpended July 1, 1936-----------------------            $36, 412. 54
Deductions on account of revocation of allotment------------------16, 50J. 00
      Net amount to be accounted for______________----------                                                                  19, 912. 54
Gross amount expended----------------------------- $51,506. 78
Less reimbursements collected_-- _______----------     -     31, 749. 07
                                                                                                                              19, 757. 71

      Balance unexpended June 30, 1937-------------------------                                                                    154. 83
Outstanding liabilities June 30, 1937------------ ----------                                                                    4, 812. 69
     Balance available June 30, 1937----------------------                                                             _     -4, 657. 86
Accounts receivable June 30, 1937_________________5,                                                                             890. 99

     Unobligated balance available June 30, 1937____________      1, 233. 13
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--___------------------------------------- 806,000. 00

Balance available for fiscal year 1938_-----                                         ____-____                               807, 233. 13
Amount (estimated) required to be appropriated for completion
of existing project 1 _____________                          300, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
     For    new      work 1----__________                                       _          _                                 300, 000. 00
     For maintenance                    _______________________________________                                               86, 000. 00
                 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
      Total                                                                                                                  386, 000. 00
  1Exclusive of available funds.
12. INTRACOASTAL WATERWAY FROM MIAMI TO FLORIDA BAY, FLA.

  Location.-This section of the Intracoastal Waterway extends
from Miami to Florida Bay, Fla. The route follows the bays and
sounds and connecting waterways. (See U. S. Coast and Geodetic
Survey Charts Nos. 3260 and 3261.)
   Existing project.-This provides for a channel 75 feet wide and 7
feet deep at mean low water from Miami, Fla., to a point immedi-
ately south of Mangrove Banks, Florida Bay, Fla., a distance of 63
miles. The mean range of tide varies from zero to 1.5 feet depending
on the proximity to openings between the keys. Northerly winds
lower the water level as much as 2 feet and southerly winds raise
the water level a somewhat lesser amount.
602      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The estimate of cost for new work, made in 1932, is $130,000, with
maintenance estimated at the rate of $10,000 annually.
  The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (Rivers and Harbors Committee Doc. No.
44, 72d Cong., 1st sess.). The latest published maps are in the
project document.
  Terminal facilities.-Exclusive of the terminal facilities reported
for Miami Harbor, there are no terminals along this waterway.
  Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done and no
costs or expenditures have been incurred. The controlling depth of
the existing channel in May 1935 was 5 feet.
  Proposed operations.-An allotment of $130,000 made during July
1937 will be applied to completing the project by contract, between
January and November 1938.
  No additional funds can be profitably expended during the fiscal
year 1939.
                         Cost and financial summary
Cost of new work to June 30, 1937---------------------------------
Cost of maintenance to June 30, 1937---------------------------------
Net total expenditures---- -------------------------------------
Total amount appropriated to June 30, 1937---------------------       -------
Amount allotted from War Department Civil Appropriation Act of
  July 19, 1937        -------------------------------------------- $130, 000
Balance available for fiscal year 1938---------------------------       130, 000

                       13. KEY WEST HARBOR, FLA.

   Location.--Key West is located on the island of Key West, near
the western end of the Florida Keys. It is about 516 statute miles
from Jacksonville, 644 statute miles from New Orleans, and 220,
miles south of the entrance to Tampa Bay. (See U. S. Coast and
Geodetic Survey Chart Nos. 584 and 1252.) The harbor proper lies
in front of the town.
   Previous projects.--Adopted by River and Harbor Act of August
2, 1882. The cost and expenditures were $27,500, of which $25,000
was for the improvement work and $2,500 was for the survey. (For
further details see page 1827 of Annual Report for 1915.)
  Existing   project.-This provides for the removal of coral heads
and reefs from the main ship channel and anchorage, so as to give a
clear depth of 30 feet at mean low water and a width in the channel
of 300 feet; and for a northwest-entrance channel with a depth of
17 feet at mean low water and of sufficient width for navigation to
be obtained by the construction of a stone jetty on each side of the
entrance and by dredging; removing the middle ground to the extent
of widening the channel opposite the wharves to a width of 800 feet
and a depth of 26 feet at mean low water. The mean range of tide
is 2.6 feet at the northwest entrance and 1.3 feet in the main ship
channel and in the harbor. The spring range of tide is 3.2 feet at
the northwest entrance, 1.7 feet in the main ship channel, and 1.7 feet
in the harbor.
   The estimate of cost of the east jetty at the northwest entrance was
$500,000; for the extension of the east jetty, $200,000; and for the
      RIVERS AND HARBORS-JACKSONVILLE,          FLA., DISTRICT   603
~est jetty, $900,000; or $1,600,000 in all, exclusive of amounts ex-
pended on previous projects. No approved estimate of cost of dredg-
ing work at that entrance has been made. The estimated cost of
the work in the main ship channel and the anchorage was $48,000.
Estimated cost of the work in removing the middle ground was
$321,200, or a total estimated cost of $1,969,200 for new work. The
latest (1931) approved estimate for annual cost of maintenance,
exclusive of the jetties, is $13,500.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the north-
west entrance (H. Doc. No. 145, 50th Cong., 2d sess., and H. Ex. Doc.
No. 39, 51st Cong., 1st sess., reprinted in Annual Reports for 1889,
pp. 1328-1337, and for 1890, pp. 1581-1596), this being later modified
by special act approved May 28, 1908, which authorized the appli-
cation of funds already appropriated to the removal of certain reefs
in the main ship channel; the act of July 25, 1912, provided for
the main ship channel (H. Doc. No. 706, 62d Cong., 2d sess.). The
removal of the middle ground was provided for by the act of July
18, 1918 (H. Doc. No. 185, 65th Cong., 1st sess.). The latest pub-
lished maps are in House Document No. 706, Sixty-second Congress,
second session; House Document No. 680, Sixty-third Congress, sec-
ond session; and House Document No. 185, Sixty-fifth Congress, first
session.
    Terminal facilities.-These consist of four wharves and six piers.
All have connections with city streets. Terminals are adequate for
present needs and, with the exception of one wharf, are open to the
public. In'addition to the above there are four Government piers.
 (For further details see Port Series No. 8, Corps of Engineers.)
   Operations and results during fiscal year.-None
    Condition at end of fiscal year.-The existing project, as a whole,
is about 50 percent completed, the remaining work being the comple-
tion of the jetties at the northwest entrance channel, which is not
considered necessary at this time. The west jetty is about 20 per-
cent completed, the east jetty is about 67 percent completed, and the
jetties as a whole are about 60 percent completed. Project dimen-
sions existed in the northwest entrance channel in March 1935, and
in the main ship channel and in the middle ground when last
ascertained.
    The costs and expenditures under the existing project have been
$1,012,908.75 for new work and $213,000.67 for maintenance, a total
of $1,225,909.42. The expenditures for new work include $345,887.16
for the removal of middle ground and $33,658.67 for work in the
main ship channel, of which $2,274.44 was for the removal of coral
heads under authority given in the special act of May 28, 1908.
    Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
    The sum of $27,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging with the U. S. hopper dredge
Absecon during November and December 1938, 2 months, involving
the removal of shoals at the northwest entrance.
    No funds can be profitably expended during the fiscal year 1939
for new work involving the completion of the jetties at the north-
604           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

west entrance, for the reason that the limited commerce making use
of the project does not justify the relatively high cost of this work.
                                   Cost and financial summary
Cost of new work to June 30, 1937--------------------------- $1, 040, 408. 75
Cost of maintenance to June 30, 1937--------------------------   213, 000. 67
      Total cost of permanent work to June 30, 1937-_                                                     1, 253, 409. 42
Net total expenditures------------------                                                                  1, 253, 409. 42
Total amount appropriated to June 30, 1937--------------------                                            1,253, 409. 42

         Fiscal year ending June 30                  1933               1934          1935             1936       1937


Cost of new work .............                 .. -- -           -- ----- --                 -     ------
                                                                                                  --
Cost of maintenance_--------------17.                       71                     $26, 998.08-
Total expended-.              --      __--------__    17.71       - .               26. 998.08    --               -

                                            2, 788.66
                    ...----------------------------
Allotted.................                                               $27, 000        -1. 92


Amount (estimated) required to be appropriated for comple-
tion of existing project------------------------------------_ $56, 300. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance-------------------------------27, 000. 00
14. CALOOSAHATCHEE                    RIVER AND LAKE OKEECHOBEE                                               DRAINAGE
                                        AREAS, FLORIDA

   Location.--The Caloosahatchee River has its source in Lake Okee-
chobee and flows in a general southwesterly direction, emptying into
the Gulf of Mexico through San Carios Bay, about 30 miles south of
the entrance to Charlotte Harbor. (See U. S. Coast and Geodetic
Survey Charts Nos. 473 and 1255.)
   Lake Okeechobee is a large, fresh-water lake located in south-
central Florida. (See U. S. Coast and Geodetic Survey Charts Nos.
804 and 805.)
   St. Lucie Canal was constructed by the Everglades Drainage Dis-
trict as a control canal for Lake Okeechobee. It begins at about the
middle of the east shore of Lake Okeechobee and empties into the
south branch of the St. Lucie River. The length of the canal is
23.9 miles.
   St. Lucie River, south branch, flows north from the entrance of
the St. Lucie Canal for about 6 miles to Stuart, where it joins the
northwest branch forming the St. Lucie River; thence east, south-
east, and east about 7 miles, emptying into the Indian River oppo-
site St. Lucie Inlet. (See U. S. Coast and Geodetic Survey Chart
No. 1247.)
   Taylor Creek is formed by the junction of several small creeks
that have their headwaters in Allapattah Flats and flows generally
in a southeasterly direction, emptying into Lake Okeechobee at its
most northerly extremity. (See U. S. Coast and Geodetic Survey
Chart No. 804.)
   For description of above waterways see page 705, Annual Report
for 1932.
   Previous projects.-Adopted by River and Harbor Acts of August
2, 1882, and August 11, 1888. The cost and expenditures for these
projects were $149,585.76, of which $9,456.59 was for new work below
Fort Myers, and $17,993.17 for new work and $122,136 for mainte-
                RIVERS AND HARBORS-JACKSONVILLE,                                           FLA., DISTRICT               605
nance above Fort Myers. For further details see page 707, Annual
Report for 1932.
   Existing project.-The project for lower Caloosahatchee River
provides for a channel 200 feet wide and 12 feet deep at mean low
water from the Gulf of Mexico to Punta Rasa, a distance of about
3.5 miles, thence 100 feet wide and 10 feet deep at mean low water
to Fort Myers, a distance of about 16 miles, with a turning basin
at that point. The project for Caloosahatchee River and Lake Okee-
chobee drainage areas provides for improving the Caloosahatchee
River and Canal from Lake Okeechobee to the Gulf of Mexico by
straightening and by dredging a channel which will provide a dis-
charge outlet capacity of 2,500 cubic feet per second from Lake Okee-
chobee and a navigation channel at least 6 feet deep and 80 feet wide,
including necessary control works (Lake Okeechobee to Fort Myers,
65 miles); improving Taylor Creek by providing a channel 6 feet
deep, when the lake is at elevation 14, and 60 feet wide from Okee-
chobee City into Lake Okeechobee, a distance of about 4.8 miles;
providing a levee and a navigation channel 6 feet deep when the lake
is at elevation 14 and 80 feet wide, following in general the south
shore of the lake for a distance of about 63 miles, and a north shore
levee about 21 miles long; providing for replacing existing locks
Nos. 1 and 2, St. Lucie Canal, with a single new lock with a usable
width of 50 feet and a usable length of 250 feet, a depth of not less
than 8 feet over the sills, and a new weir structure; providing for
the protection of the St. Lucie Canal from erosion and silting, and
improving St. Lucie River to provide a channel 6 feet deep at local
mean low water and 80 feet wide from St. Lucie Canal to Indian
River, a distance of about 13 miles. All levees were subject to
modification of location and design at the discretion of the Chief of
Engineers.
   The following tables show the principal features of the locks and
dams and protective works included in the project:
                                                           Locks and dams
                                                         ST. LUCIE CAN4AL


                                                                                          Width of
                                                                                           chamber
                              Distance                                                    and great-     if lake Depth over
Lock and dam                from Lake                                        Distance    est length           s sills at lake
          no.                Okeechobee             Nearest town               (miles)    available    elevation    elevation
                               (miles)                                                     for full    +14.0 feet   +14.0 feet
                                                                                           width
                                                                                            (feet)

1     ----.............             0. 5   Port Mayaca, Fla-........--             0. 5      150X30          4.0            8.0
21 .........-------------.         20.0    Stuart, Fla "----------------           8.0       150X30          9.0            8.0
(No name)--....                    20.0-        do.....................            8.0       250X50         11.0 {Lower14.

                                                   CALOOSAHATCHEE               RIVER

1   2------                         9.0    Moore Haven, Fla--------               0.75       250X50          2.0           10.0
2 .........                       29.0     La Belle, Fla---------------           8.0        250X50          9.0           10.0

    1 Constructed by Everglades               drainage district.       These locks are provided with bypasses as follows
Lock 2, 50 feet wide, 250 feet long; and lock 1, 50 feet wide, length unlimited. These two locks are to be
replaced by a single new lock and spillway.
  2Combined hurricane gate and lock.
  8 Lock no. 2 under construction by United States at Ortona.
606                     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                          1937

                                                Locks and dams-Continued

                                                             ST. LUCIE CANAL

                                                                               Type of construction                      Date of Actual cost
  Lock and dam             Character of        Kind of darn                                                               corn-    of lock
       no.                 foundation          Kpo                                                                                odoa
                                                                          Lock                      Dam                  pletion and dam


1---..-.--.--             Rock....... Needle-con- Concrete.... Concrete,needle con- 1925                                             $127,448.98
                                        trolled spill-                    controlled.
                                        way.
2Pile---......------.......            -- do--..--...--....--- do------_--..do-------------
                                                                               .......      1925                                       419, 546. 94
(No name) ....-..... do...... Spillway, taint- _....do- ...             Concrete, tainter ........                                   4806,000.00
                                        er gate con-                      gate controlled.
                                        trolled.

                                                   CALOOSAHATCHEE RIVER

1-                                               .......-- Concrete....
                           Pile......... None------                                      None_--------                     1936      $538, 142. 44
2-...................         do.-...    Spillway, taint- _....do......                  Concrete, tainter                 1937      4 695, 000.00
                                           er gate con-                                   gate control.
                                           trol.

   4 Cost estimated.
                                                             Hurricanegates

Hurri-                                                Dis-       Width of chamber and greatest                     Lift at lake Depth over
  cane                   Nearest town                 tance          length available for full                       elevation sills at lake
  gate                                               (miles)               width (feet)                               14.0 feet    levation
  no.                                                                                                                             14.0 feet

                                                                                                                                         Feet
          2     Clewiston, Fla------------               0       50 feet wide, length unlimited                           None                  10. 0
          3     Lake Harbor, Fla.........                  .5   ..... do-----------------------                            one                  10. 0
          4     Belle Glade, Fla...........              4.0    ..... do.--           -----.--.--.--                      None                  10. 0
          5     Canal Point, Fla..........               0      ..... do--.....................---.....                   None                  10. 0
          6     Okeechobee, Fla...........               6. 0   ..... do      .-----------------                          None                   7. 0

Hurri- Character of                                                                                              Date com"
cane    foundation                         Type of construction                       Type of gate               pleted            Actual cost
gate no.

         2 Pile........ Concrete...-------------------.................... Steel sector....                     Feb. 26, 1935          $309, 748. 18
                                                                                          do--.....------...
         3 Rock-------....... --.....do--------...........---....----------.......... ----..                    ...--do-------........  316, 938. 28
         4 .--.. do.------.do-                       .-----------                         do..                 -     do--------350,025.30
         5   ...-do ------- do-.-.----------                              --       ----- do-- --------               do- ------- 262, 464.60
         6 Pile........ Concrete with automatic culvert ..... do........                                        Dec. 11, 1936           373, 273.30
                               controlled spillway.


  The mean range of tide at Punta Rasa is 1.7 feet. The spring
range is 2.2 feet. Tidal influence is perceptible at La Belle, 55 miles
above Punta Rasa, at low-river stage. The mean range of tide at
St. Lucie Inlet is 2.6 feet. The spring range is about 3 feet.
  The estimate of cost for new work, revised in 1937, is $17,500,000,
exclusive of amounts expended on previous projects, and of which
$500,000 was contributed by local interests.       The latest (1937)
approved estimate for annual cost of maintenance is $195,000, includ-
ing $63,000 for operating and care of locks and dams and protective
works.
  The existing project for the Caloosahatchee River below Fort
Myers was adopted by the River and Harbor Act of June 25, 1910
(Rivers and Harbors Committee Doc. No. 8, 61st Cong., 2d sess.).
The existing project for the Caloosahatchee River and Lake Okee-
chobee drainage areas was adopted by the River and Harbor Act
of July 3, 1930 (S. Doc. No. 115, 71st Cong., 2d sess.). This latter
       RIVERS AND HARBORS-JACKSONVILLE,          FLA., DISTRICT    607

project was modified by the River and Harbor Act of August 30,
1935, to provide that the United States maintain all project works
when completed and bear the cost of all drainage structures hereto-
fore or hereafter constructed in connection with the project and that
the total cash contribution required of local interests toward the cost
of the project shall be $500,000. The River and Harbor Act of
August 26, 1937, provided for the construction of a new lock in St.
Lucie Canal (Rivers and Harbors Committee Doc. No. 28 75th
Cong., 1st sess.). The latest published map of the lake is in Senate
Document No. 115, Seventy-first Congress, second session, and maps
of the remainder of the project are in House Document No. 215,
Seventieth Congress, first session.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
authorized the construction of a new lock and spillway in St. Lucie
Canal subject to the provision that local interests furnish all lands
and easements necessary for the execution of the work. All prior
requirements have been fully complied with.
   Terminal facilities.-In the vicinity of Fort Myers on the Caloosa-
hatchee River these consist of three freight piers, one railroad ter-
minal pier, one municipal recreation pier, and four privately owned
piers. There are numerous small wooden-pile landings along the
upper Caloosahatchee River, along the lake shore, in St. Lucie Canal,
and on St. Lucie River, including one railroad terminal pier, a
municipal pier, and a pier for handling petroleum products at Stuart.
The facilities are adequate for present needs.
   Operations and results during fiscal year-Regular funds-New
work.-Under a continuing contract for the construction of 83,131
linear feet of levee on the north shore, and the dredging of 9,300
linear feet of oodway channel at the entrance to the Kissimmee River,
work was commenced July 22, 1936, and at the close of the fiscal year
was about 61 percent completed. A total of 3,903,994 cubic yards of
material was placed in the levee and 547,094 cubic yards dredged
from the floodway channel, completing the floodway channel, 9,195
feet long, and substantially completing about 25,000 linear feet of
levee. The cost was $667,388.
   Under a contract for dredging to a depth of 6 feet in Taylor
Creek from its mouth to near the Florida East Coast Railway bridge
near Okeechobee City, a distance of about 4 miles, work was com-
menced July 30, and continued to November 30, 1936, when it was
temporarily suspended by mutual agreement. A total of 351,224
cubic yards of material was removed, completing about 10,595 linear
feet of channel at a cost of $39,793.88.
   The construction, under contract, of a lock and spillway in the
Caloosahatchee Canal near Ortona, in progress through February
1937, with emergency relief funds, was continued with regular
funds and at the close of the fiscal year was substantially completed
except for testing, macadam driveways, sodding, and automatic water
control gages. The cost under regular funds was $142,050.91. Under
two contracts, a locktender's house, garage, boathouse, and landing
dock were constructed at the Moore Haven lock between December
29, 1936, and June 4, 1937, and a similar locktender's house and
garage were commenced at the Ortona lock on June 21, 1937. The
cost was $13,946.52.
     20196-37-pt. 1-39
608      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    T::'he construction, by hired labor, of steel sheet-pile groins at the
lakeside ends of drainage culverts through the levee on the east
shore of Lake Okeechobee, in progress at the beginning of the fiscal
year, was completed October 20, 1936. During the period 10 groins
were completed, 2 at each of 5 drainage culverts through the levee,
-at a cost of $71,393.34.
         .of
    Thep lacing, by hired labor, of rock riprap and backfill along the
ch1n~nie      the Caloosahatchee Canal at the railway and highway
biides at1Moore Haven and the construction of riprap revetments
fr the protection of the canal banks between Moore Haven and Cit-
rus Center was commenced February 18 and completed June 30,
1937. A total of 6,870 cubic yards of riprap and backfill was
placed at a cost of $19,255.95.
    Between May 10 and June 12, 1937, excepting the period June
8-9, 1937, the U. S. derrick boat D-1 was engaged in removing
obstructions, consisting of snags, stumps, and trees, from the chan-
nel and banks of the Caloosahatchee River between LaBelle and the
Atlantic Coast Line Railroad bridge near Fort Myers, a distance
of about 26 miles. The cost was $6,515.27.
    The cost of installing and maintaining temporary aids to navi-
gation was $8,232.88. Automatic tide gages were installed at hurri-
cane gate no. 6 and at lock no. 1, Moore Haven, and wind-recording
instruments and station barographs were installed in the operators'
houses at lock no. 1, Moore Haven, and at hurricane gates nos. 2, 3,
5, and 6, at a total cost of $11,555.13. The costs of improvements
made at the United States reservations at Clewiston and at the
Moore Haven lock, the construction of storage cabinets and flag
poles on the reservations at Moore Haven and Ortona and the ware-
   ouse reservation at Clewiston were $5,584.18.
    Costs incurred in connection with work completed during the
previous fiscal year, and costs of preliminary surveys and of surveys
and contingencies incidental to the supervision of the project were
$50,090.23.
    Maintenance.-The cost of maintenance of the south and east
shore levees and the completed portion of the north shore levee in-
volving filling in washes, mucking and replacing sod where neces-
sary, conducting fertilizer and mucking experiments, the main-
tenance and repair of the riprap channel slopes of) the south and
east shore levees, mowing levees, and the construction of fences to
prevent unauthorized access to hurricane gates cost $21,552.40.
    The protection of the levee toe between Bacom Point and St. Lucie
Canal, a distance of about 141/2 miles, from wave action by the con-
struction of riprap revetment wall and earth backfill was com-
menced July 22, 1936, by hired labor as a bid rejection job. The
material was hauled by trucks and barges to April 13, 1937. On
April 16, 1937, the U. S. pipe-line dredge Congaree commenced
pumping material to complete the backfill behind the toe wall where
fill was incomplete, and this work was in progress at the close of
the fiscal year. A total of 58,391 linear feet of toe wall was con-
structed and backfilling partially completed behind 57,391 linear
feet of this wall, involving the placing of 80,839 cubic yards of rock
riprap and 265,589 cubic yards of backfill at a cost of $369,554.60.
   The U. S. derrick boat D-1, from March 12 to 18, 1937, and the
leased pipe-line dredge T. H. Latham, from March 15 to 26, 1937,
       RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT            609
removed an aggregate of 12,559 cubic yards of material from a shoal
in the Caloosahatchee Canal near Ortona at a cost of $3,727.99.
   The cost of preliminary surveys and of surveys and contingencies
incidental to the supervision of the project was $27,360.89.
    Operating and care.-Locks 1 and 2 on the St. Lucie Canal, new
locks 1 and 2 on the Caloosahatchee Canal, 5 hurricane gates on
Lake Okeechobee, 16 drainage culverts on the west, south, and east
shore and 4 drainage culverts on the north shore of Lake Okeecho-
bee, and 16 drainage spillways on the St. Lucie Canal were op-
erated and maintained. Lock no. 2, Ortona, was opened to paviga-
tion during March 1937, but in order not to interfere with the
operations of the contractor, its use for such purposes was limited
to certain periods each day. Lockages were made as follows: Lock
no. 2, St. Lucie Canal, 467; lock no. 1, St. Lucie Canal, 375; lock
no. 1, Moore Haven, 2,112; and lock no. 2, Ortona, 230. The cost
was $49,829.07.
    The costs for the fiscal year from regular funds were $1,035,806.29
for new work, $422,195.88 for maintenance, and $49,829.07 for oper-
ating and care, a total of $1,507,831.24. The total expenditures were
$1,293,984.30.
   Public Works funds.-The construction, under contract, of one
steel and concrete hurricane gate structure with metal pipe drainage
spillway through the levee at the mouth of Taylor Creek and four
metal-pipe culverts, with concrete headwalls, on the north shore, in
progress at the beginning of the fiscal year, was completed Decem-
ber 11, 1936, at a cost of $268,501.86. The cost of maintenance of
various structures, completed with Public Works funds, during the
construction of the entire improvement was $914.97 for new work.
The cost pertaining to work completed during the previous fiscal
year was $2,019.12 for new work. The total cost for the fiscal year
from Public Works funds was $271,435.95 for new work and the total
expenditures were $320,710.22.
   Emergency Relief funds.-The dredging of 47.31 miles of the proj-
ect dimension floodway channel in the Caloosahatchee Canal and
River from the Moore Haven lock to near Buckingham, in progress
at the beginning of the fiscal year under three contracts, was com-
pleted June 4, 1937. A total of 5,473,640 cubic yards of material
was removed and 19.39 miles of channel completed at a cost of
 $594,492.65.
    The removal of old locks nos. 1 and 2 in the Caloosahatchee Canal
at Moore Haven and Citrus Center, respectively, in progress under
contract at the beginning of the fiscal year, was completed June 3,
1937, at a cost of $19,438.03.
    The construction of a lock and spillway at Ortona, in progress
under contract at the beginning of the fiscal year, was continued
with Emergency Relief funds to February 28, 1937, when these funds
became exhausted, the work at that time being about 80 percent
completed. The cost was $241,361.10. The work is being completed
with regular funds.
    Adjustments reduced the cost of surveys, plans, estimates, etc., by
 $1,099.12. The costs for the fiscal year from Emergency Relief funds
were $854,192.66 for new work and the expenditures were $998,490.71.
    Summary.-The total cost for the fiscal year, all funds, was
 $2,633,459.85, of which $2,161,434.90 was for new work, $422,i95.88
610     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

for maintenance, and $49,829.07 for operating and care. The total
expenditures were $2,613,185.23.
   Condition at end of fiscal year.-The existing project is about 92
percent completed. The portion of the Caloosahatchee River below
Fort Myers was completed in 1913. Essential features of the Caloosa-
hatchee River and Lake Okeechobee drainage areas project have
been accomplished as follows: The dredging of 56.75 miles of flood-
way and navigation channel in the Caloosahatchee River and Canal
from Moore Haven to Fort Myers, having a minimum bottom width
of 90 feet and a depth of at least 7 feet, has been completed and the
riprap protection of this channel has been completed from Moore
Haven to Citrus Center; the dredging of 58.3 miles of navigation
channel in Lake Okeechobee along the south shore levee from the
Fisheating Creek auxiliary floodway channel to the St. Lucie Canal,
having a depth of at least 6 feet and a bottom width of at least 80
feet, has been completed; dredging Taylor Creek to provide a channel
at least 6 feet deep and 60 feet wide from Okeechobee City into
Lake Okeechobee, a distance of about 21,095 linear feet, is about
80 percent completed; auxiliary floodway channels extending into
Lake Okeechobee have been dredged at the mouth of the Clewiston
Industrial Canal, in the vicinity of Liberty Point, near the mouth
of Fisheating Creek, at the mouth of the Kissimmee River, and at
the mouth of Taylor Creek; dredging in St. Lucie River to provide
a channel 6 feet deep and 80 feet wide was completed in 1931; old
locks in the Caloosahatchee Canal at Citrus Center and Moore
Haven have been removed; the construction of a new lock and
spillway structure in Caloosahatchee Canal near Ortona is substan-
tially completed, and the construction of a combined lock and hur-
ricane gate in the Caloosahatchee Canal at Moore Haven has been
completed; the construction of 69.2 miles of continuous levee on the
west, south, and east shores of Lake Okeechobee has been com-
pleted, and the north shore levee, 15.86 miles long, has been com-
pleted for a distance of 4.84 miles; the construction of 4 hurricane
gates through the levee at the entrances to canals at Clewiston, Lake
Harbor, South Bay, and Canal Point, of a combined hurricane gate
and spillway through the north shore levee at Taylor Creek, and of
16 metal pipe drainage culverts with concrete headwalls through
the west, south, and east shore levee, and four similar culverts
through the north shore levee, has been completed; two steel sheet-
pile groins at hurricane gate at Canal Point and two similar groins
at each of six drainage culverts on the east shore of Lake Okeechobee
have been constructed; and 16 drainage spillways have been con-
structed along the banks of the St. Lucie Canal. For details relative
to locks and hurricane gates, see the tables under the paragraph
"Existing project."
   The approximate controlling depths at low water, when last ascer-
tained, were as follows: Gulf of Mexico to Punta Rasa, 11.5 feet,
and Caloosahatchee River from Punta Rasa to Fort Myers, 9.5 feet,
both in November 1936; Fort Myers to Atlantic Coast Line Rail-
road bridge near Beautiful Island, 8 feet in January 1937; thence
to Moore Haven, 4.6 feet in June 1937; Lake Okeechobee from Moore
Haven to St. Lucie Canal via south shore levee channel, 5.3 feet in
June 1937, and via Liberty Point Floodway Channel, 7 feet in Feb-
ruary 1936; St. Lucie Canal from Port Mayaca to lock no. 2, 8 feet
        RIVERS   'AND   HARBORS-JACKSONVILLE,              FLA., DISTRICT     611

in April 1935; and thence St. Lucie River to its junction with the
Intracoastal Waterway, 6 feet except at the lower sill of lock no. 2,
where the controlling depth is 5 feet. The controlling depth in
Taylor Creek from Okeechobee City into Lake Okeechobee is 3 feet.
   The work remaining to be done to complete the project is as
follows:
   (a) Completion of new lock and spillway at Ortona, under exist-
ing contract.
   (b) Completion of rock riprap protection on the Caloosahatchee
River from Citrus Center to Fort Myers.
   (c) Completion of dredging of Taylor Creek to provide a channel
6 feet deep and 60 feet wide from the town of Okeechobee into Lake
Okeechobee, under existing contract.
   (d) Completion of approximately 58,131 linear feet of levee on
the north shore of Lake Okeechobee, under existing contract.
   (e) The construction of a new lock and spillway in St. Lucie
Canal to replace existing locks nos. 1 and 2, authorized by the River
and Harbor Act approved August 26, 1937.
   Under regular funds the costs of the existing project have been
$5,681,057.59 for new work, $655,934.12 for maintenance, and $63,-
747.27 for operating and care, a total of $6,400,738.98, and the ex-
penditures have been $6,242,178.56. Under Public Works funds the
costs and expenditures have been $7,694,385.54 for new work. Under
Emergency Relief funds the costs have been $2,170,253 for new work
and $747 for maintenance, a total of $2,171,000, and the expenditures
have been $2,167,276.80. Under contributed funds the costs and ex-
penditures have been $500,000 for new work. The grand total cost,
all funds, has been $16,766,124.52, of which $16,045,696.13 was for
new work and $656,681.12 for maintenance, and $63,747.27 for operat-
ing and care. The total expenditures have been $16,603,840.90.
   Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1937, together with allotments of $551,000 made
during July 1937, a total of $1,056,865.24, will be applied as follows:
Accounts payable June 30, 1937-------------------                     $214, 686.85
New work:
    Completion, during December 1937, of continuing
      contract for construction of north shore levee
     and floodway channel-------------------------      $434,041.00
    Resumption, about Jan. 1, 1938, and comple-
      tion, June 30, 1938, of existing contract for the
      dredging of Taylor Creek between Okeechobee
     City and Lake Okeechobee--------------------         11, 100. 00
    Completion, about Sept. 1, 1937, of existing
      contract for the construction of lock no. 2
     at Ortona, Caloosahatchee Canal--------------        31, 309. 51
    Completion, about Oct. 1, 1937, of existing con-
      tract for the construction of locktender's house
      at lock no. 2, Ortona                       _____---------------
                                                                 4, 450. 68
    Storm-proofing quarters and buildings on the res-
      ervation at Clewiston, by hired labor, between
      Aug. 1, 1937, and Nov. 1, 1937 ----------
                                         _____                15, 200. 00
    Placing fill material around locktender's house
      and laborers' quarters at lock no. 2, Ortona, by
      hired labor, between Aug. 1, 1937 and Nov. 1,
      1937 ---------------------------------         __        3,000.00
    Fencing reservation to keep cattle off grounds
      and policing reservation at lock no. 2, Ortona,
      by hired labor, between Aug. 1, 1937, and
      Nov. 1, 1937__----___------ _------------------          1, 600. 00
612      REPORT OF CHIEF OF ENGINEERS             U. S. ARMY, 1937

New work-Continued.
   Placing drainage pipe through spoil bank below
     lock no. 2, Ortona, to drain area adjacent to
     reservation, by hired labor, between Aug. 1,
     1937, and Nov. 1, 1937 ------------------------      $1,200. 00
   Begin during September 1937, by contract, and
     complete about Jan. 31, 1938, the construc-
     tion of 1 additional locktender's house at lock
     no. 2, Ortona---------------------------------        6, 000. 00
   Installation of sewage disposal system at lock
     no. 2, Ortona, by hired labor, between Aug. 1,
     1937, and Nov. 1, 1937_______________                 2,100. 00
   Protection of graded slopes and approach banks
     at lock no. 2, Ortona, by grassing and sodding,
     by contract or hired labor, between July 1, 1937,
     and Oct. 31, 1937----       ------------              5, 000. 00
                                                                         $515, 001. 19
Maintenance:
   Maintenance, by hired labor, between July 1,
      1937, and June 30, 1938, of levee slopes and
      toe ditches in divisions 1, 2, 3, 9, and 4, and
      repairs to east shore revetment in divisions 2
      and 9___------------------                         100, 000. 00
   Construction, by hired labor, between July 1,
      1937, and Nov. 1, 1937, of fences across ramps
      at hurricane gates, to protect levee crown and
      slopes and to prevent unauthorized access to
      the structures______________                        7, 908.40
   Dredging, by hired labor or contract, betwden
      July 1, 1937, and Nov. 30, 1937, to remove only
      such shoaling below lock no. 2, St. Lucie Canal,
      as may interfere with 6-foot navigation ______     37, 384. 40
   Dredging, by hired labor or contract, between
      July 1, 1937, and Oct. 31. 1937, to remove only
      such 'shoaling between Moore Haven and Fort
      Myers as may be necessary to maintain 6-foot
      navigation------        -     ----------------     37, 384. 40
   Completion, by hired labor, between Aug. 1,
      1937, and Dec. 1, 1937, of east shore protection
      work in divisions 2 and 9, involving the placing
      of rock paving along the lakeside toe of fill_ .   75, 000. 00
                                                                          257, 677. 20
Maintenance (operation and care of locks, spill-
ways, hurricane gates, and drainage culverts) :
    Operation-----------------------------------           24, 620
   Ordinary repairs---- -----------------------             26, 680
    Improvement and reconstruction ------------              4, 250
   Emergencies-------------------------------               13, 950
                                                                           69, 500. 00

      Total for all work--    -------------------------------           1, 056, 865. 24
   The balance unexpended and accounts receivable on July 1, 1937,
from funds allotted from the Emergency Relief Appropriation Act
of 1935 ($3,727.95), will be applied to the payment of outstanding
obligations.
   The additional sum of $1,208,800 can be profitably expended during
the fiscal year 1939 as follows:
New work:
   Begin, about Sept. 1, 1938, by contract, the re-
    placement of locks 1 and 2 on the St. Lucie Canal
    by the construction of a new lock and spillway at
    lock 2---------     --------------------- ------- $806, 000
          RIVERS AND HARBORS-JACKSONVILLE,                          FLA., DISTRICT    613
New work--Continued.
   Begin Jan. 1, 1939, and complete June 1, 1939, by hired
     labor, operations of protecting channel from shoal-
     ing by riprapping side drainage openings in the
     Caloosahatchee River between Citrus Center and
     Fort Myers ---------------------------------           $36, 800
   Provide for the construction, by contract, of a storm-
     proof office and administration building on United
     States reservation at Clewiston, July 1-Oct. 1, 1938__ 25, 000
                                                                                 $867, 800
Maintenance:
    Dredging, by contract, the navigation and floodway
      channel between Fort Myers and Lake Okeechobee
      between July 1938 and January 1939           ------------ 58, 000
   Removing snags and overhanging trees from Caloosa-
      hatchee River between LaBelle and Beautiful Island.
      Work to be performed by United States plant and
      hired labor between July 1, 1938, and Jan. 1, 1939..       15, 000
    Dredging, by contract, in St. Lucie River between lock
      no. 2 and Intracoastal Waterway, 3 months, October,
      November, and December 1938         ------------------- 48, 000
    Dredging, by contract, in Taylor Creek to restore
      project depth, 1 month, October 1938----..------           16, 000
   Dredging, by contract, in Liberty Point floodway chan-
      nel, to restore project depth, 1 month, November 1938_ 16, 000
   Maintenance of east shore protection work to prevent
      wave action against levee. Work to be performed by
      United States plant and hired labor between July 1,
      1938, and Oct. 1, 1938, and Apr. 1, 1939, and June 30,
      1939---------------        --------------- ---------- 25,000
   Maintenance of channel slopes in divisions 7 and 8,
      by United States plant and hired labor, between July
      1, 1938, and June 30, 1939____ _________----          -___ 15, 000
   Maintenance of levee slopes, by repairing gullies,
      replacing sod in divisions 1, 2, 3, 4, and 9, by United
      States plant and hired labor, between July 1, 1938,
      and June 30, 1939__ ____        _____------------          30, 000
    Maintenance of groins and riprapped slopes in divisions
      1, 2, 3, 4, and 9, by United States plant and hired
      labor, between July 1, 1938, and June 30, 1939 ----- 15, 000
    Periodic and miscellaneous surveys----------------           15,000
                                                                                   253, 000
Maintenance (operation and care of locks, spillways, hurri-
cane gates, and drainage culverts) :
    Operation   -------------------------------------         24, 000
    Ordinary repairs-------------------------------           24, 000
    Improvement and reconstruction__, --------             -15, 000
    Emergencies          -----------------------------------25, 000
                                                                                     88,000
         Total for all work_____------------- ------------------                1, 208, 800
                                Cost and financial summary
                         MAINTENANCE      AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937__ __---------__1_        1,2 $5, 708, 507. 35
Cost of maintenance to June 30, 1937----------------------       1841, 817. 39
      Total cost of permanent work to June 30, 1937----------                6, 550, 324. 74
Undistributed costs June 30, 1937--------------------------                      45,771.54
         Net total cost to June 30, 1937 .-_.1_-_-    -    ------      ,-    6,596,096. 28
  1Includes transfer of $4,291.65 from new work to maintenance.
  2
      Inaddition, $500,000 contributed funds expended for new work.
614                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Plus accounts receivable June 30, 1937-------                                              _____          ____-        -        $10, 354. 89

     Gross total costs to June 30, 1937 -----        -6__                                             _______                6, 606, 451. 17
Minus accounts payable June 30, 1937----------------------                                                                      214, 686. 85

     Net total expenditures----__-------------                                                      -- ___         _         26, 391, 764. 32
Unexpended balance June 30, 1937-------------__--_-                                                          -____              495, 510. 35

           Total amount appropriated to June 30, 1937------------                                                             6, 887, 274. 67

Fiscal year ending June 30                     1933                     1934               1935                   1936               1937

Cost of new work---------........ $793,869.85                   $1, 057, 434. 70       $1,416,408.21        $462, 109. 44         $1, 035, 806.29
Cost of maintenance....... --------------                            59, 564. 81            2,498. 33         27, 201.61              472, 024. 95
        Total cost-----------...........    793. 869, 85             1, 116, 999. 51    1, 418, 906. 54      489, 311.05           1, 507, 831.24
Total expended-----------............        762, 148. 65            1, 542, 720. 70    1, 046, 238. 80      815, 286. 42          1, 293, 984. 30
Allotted..---------------                  1,929, 225. 73            1, 473, 070. 81     -97, 768. 00      2, 089, 732. 26           325, 000. 00


Balance unexpended July 1, 1936____________                                                                                  $1, 464, 494. 65
Amount allotted from War Department Appro-
  priation Act approved April 26, 1934----------                                               $175, 000.00
Amount allotted from War Department Appro-
priation Act approved April 9, 1935--- -- __                                                     75, 000. 00
Amount allotted from War Department Appro-
priation Act approved May 15. 1936__---____                                                      75, 000. 00
                                                                                                                                325, 00. 00
Amount to be accounted for_-_--_____-
                                   -_____                                                         -       -___ 1, 789, 494. 65
Gross amount expended---------                                                               $1,467, 008. 82
Less-
        Reimbursements collected------ $172,917. 52
        Receipts from sales-- ---------     107. 00
                                                                                                  173, 024. 52
                                                                                                                              1, 293, 984. 30
      Balance unexpended June 30, 1937 ---------------------                                                                     495, 510. 35
Outstanding liabilities June 30, 1937 --------  -214, 686. 85
Amount covered by uncompleted contracts------      280, 984. 94
                                                                                                                                495, 671. 79
     Balance available June 30, 1937_----------------------                                                                        -- 161.44
Accounts receivable June 30, 1937---------------                                                                                  10, 354. 89

Unobligated balance available June 30, 1937 ------------------                                                                    10,193.45
Amount allotted from War Department Civil Appropriation
  Act approved July 19, 1937-                                                                                                    551, 000. 00

            Balance available for fiscal year 1938-___--                                          ___-____               -       561, 193.45

Amount (estimated) required to be appropriated for comple-
tion of existing projects 3_________________________________                                                                    867, 800. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 8 - - --- -- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                              867, 800. 00
                                     ----- - -- -- - - -- - -- - -- - - -- - -- - -- - -
   For maintenance 3                                                                                                             341, 000. 00
            Total - - - - - - - -           - - --          -   --
                                                                                              ---------                       1, 208, 800. 00
    2 In addition, $500,000 contributed funds expended for new work.
    8 Exclusive  of available funds.
                RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                                                                         615
                                                          PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937____     _        __--------------                                                        $7, 694, 385. 54
Cost of maintenance to June 30, 1937-----------------------

      Total cost of permanent work to June 30, 1937----------7, 694, 385. 54
Net total expenditures____________-__________-___             7, 694, 385. 54
Total amount appropriated to June 30, 1937- -----------       7, 694, 385. 54

  Fiscal year ending June 30                       1933               1934                    1935                  1936              1937


Cost of new work.....----------------------                      $1, 533, 220. 02     $4, 169, 474. 70          $1, 720, 254. 87   $271,435.95
Cost of maintenance---------------------------------------------------                                       --------------------------
Total expended------------ ----------------                       1, 338, 118. 42      4, 179, 617. 12           1, 855, 939. 78   320, 710. 22

Allotted.....-------------------.......-------------.....         4, 200, 000. 00      3, 500, 000.00 ----------------                5, 614. 46


Balance unexpended July 1, 1936__ ___________---_--                                                                           $326, 324. 68
Deductions on account of revocation of allotment                                                                                 5, 614. 46

                                                  -320,
      Net amount to be accounted for____ -_____-----                                                                                 710. 22
Gross amount expended__    --------------   -     $329,880.04
Less reimbursements collected ------------------     9,169. 82
                                                                                                                               320, 710. 22
                                                      EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937_                                           -____-___ __-_ ----                            $2, 170, 253. 00
Cost of maintenance to June 30, 1937_                                           ______----------------                               747. 00

      Total cost of permanent work to June 30, 1937----------                                                                2, 171, 000. 00
Plus accounts receivable June 30, 1937 ___-... _________--_                                                                            4. 75

     Gross total costs to June 30, 1937______________--__                                                                    2, 171, 004. 75
Minus accounts payable June 30, 1937__________-______     _                                                                       3, 727.95

     Net total expenditures_____________-___________                                                                         2, 167, 276. 80
Unexpended balance June 30, 1937---------------------------                                                                       3, 723. 20
             Total amount appropriated to June 30, 1937                                         __-__-__-                   $2, 171, 000. 00

          Fiscal year ending June 30                           1933           1934              1935                 1936             1937


Cost of new work--.......------------------          -     --                                            .$1,       316, 060. 34   $854, 192. 66
Cost of maintenance---....-------------- ----------------------------                                    ----.           747. 00
         Total cost---....     ----------------------------                                                      1, 316, 807. 34    854, 192. 66
Total expended-......_-------                          _
                                            -------------         ----- ----------------- _              _       1, 168, 786. 09    998, 490. 71
Allotted-------......   ------------------------------------                              $2, 671, 000           -500, 000. 00


Balance unexpended July 1, 1936--------------------------                                                                   $1, 002, 213.91
Gross amount expended------------------- $1, 018,122.84
Less reimbursements collected ----------------- 19, 632. 13
                                                                                                                               998. 490 71

      Balance unexpended June 30, 1937_________                                                                                    3, 723. 20
Outstanding liabilities June 30, 1937 _______                                                                                      3, 727. 95
     Balance available June 30, 1937______   ____----    -____                                                                       -4. 75
Accounts receivable June 30, 1937________________________                                                                               4. 75
616            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

CONSOLIDATED           COST    AND FINANCIAL           SUMMARY          FOR     CALOOSAHATCHEE               RIVER,       ETC.

Cost of new work to June 30, 1937_-------__---------                                               12 $15, 573, 145. 89
Cost of maintenance to June 30, 1937_ -_______---------                                       -_         1842, 564. 39

      Total cost of permanent work to June 30, 1937_-------                                              16, 415, 710.28
Undistributed costs June 30, 1937---------------------------                                                  45, 771. 54

      Net total cost to June 30, 1937_. ___                        461, 481. 82
                                                       -__________-_16,
Plus accounts receivable June 30, 1937___-----------------          10, 359. 64

     Gross total costs to June 30, 1937 ------------------                                               16, 471, 841. 46
Minus accounts payable June 30, 1937-----------------------                                                  218, 414. 80
                                                                                                     2
     Net total expenditures_______-___-                                                                  16, 253, 426. 66
Unexpended balance June 30, 1937 --                             -------------------                          499, 233.55

          Total amount appropriated to June 30 ,1937 __________                                          16, 752, 660. 21

  Fiscalyear ending               1933               1934                1935               1936                   1937


Cost of new work....           $793,869.85       $2, 590, 654. 72   $5, 585, 882. 91    $3,498,424. 65         $2, 161, 434. 90
Cost of maintenance___------...---.-                  56, 564.81          2, 498. 33        27, 948. 61            472, 024. 95
       Total cost-.......        793, 869. 85     2,650, 219. 53     5, 588, 381. 24     3, 526, 373. 26        2, 633, 459. 85

Total expended--------......     762,148. 65      2,880, 839. 12      5, 225, 855. 92    3,840,012. 29          2, 613, 185. 23
Allotted-...............       1, 929, 225. 73    5, 673, 070. 81    6,073, 232. 00      1, 589, 732. 26           319,385.54


Balance unexpended July 1, 1936__ ____________-____-----____                                             $2, 793, 033. 24
Amount allotted from War Dept. Appropriation
Act approved April 26, 1934________________       $175, 000. 00
Amount allotted from War Dept. Appropriation
  Act approved April 9, 1935 --___- ______________    75, 000. 00
Amount allotted from War Dept. Appropriation
Act approved May 15, 1936 _ _______-__               75, 000. 00
                                                                                                              325, 000. 00

     Amount to be accounted for _________ ________---       --                                             3, 118, 033. 24
Deductions on account of revocation of allotment__-----------                                                   5, 614. 46;

      Net amount to be accounted for__ ___ -_______         -                                              3, 112, 418. 78
Gross amount expended--------------__----        $2, 815, 011. 70
Less:
    Reimbursements collected- ---- $201, 719. 47
    Receipts from sales-----------       107. 00
                                                     201, 826. 47
                                                                                                           2!, 613
                                                                                                               V._,
                                                                                                                    18
                                                                                                                    -. VJ.
                                                                                                                           2. J

      Balance unexpended June 30, 1937-__                                                                     499, 233.55
Outstanding liabilities June 30, 1937------------$218, 414. 80
Amount covered by uncompleted contracts --------   280, 984. 94
                                                                                                              499,399. 74
      Balance available June 30, 1937--------------------                                                       -166. 19
Accounts receivable June 30, 1937----------    ------------                                                    10, 359. 64
Unobligated balance available June 30, 1937----------------                                                    10, 193. 45.
Amount allotted from War Dept. Civil Appropriation Act
  approved July 19, 1937-------------         --------                                                        551, 000. 00
           Balance available for fiscal year 1938_                          -____-
                                                                              -- -__         -                561, 193. 45,
   1 Includes transfer of $4,291.65 from new work to maintenance.
   s In addition, $500,000 contributed funds expended for new work.
            RIVERS AND HARBORS-JACKSONVILLE,                                                     FLA., DISTRICT                617
Amount (estimated) required to be appropriated for completion
                     3- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project                                                                                                   867, 800. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 3- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 867 , 800 . 00
        maintenance
   For Forainenace-----------------------------------------34,0.0
                      ----                                        _                341, 000. 00
                         - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
         Total 3 - - -                                                                                               1, 208, 800. 00
  s Exclusive     of available funds.

                                           15. ORANGE RIVER, FLA.

   Location.-This river rises in the southwestern part of the Penin-
sula of Florida and flows in a general northwesterly direction, empty-
ing into the Caloosahatchee River about 6 miles above Fort Myers.
Its total length is somewhat over 6 miles.
   Existing project.-This provides for securing and maintaining a
continuous channel with a navigable depth of 4 feet at mean low
water and a width of 50 feet from the mouth of the river to the head
of navigation at Buckingham by dredging and the removal of snags
and overhanging trees. The length of the section included in the
project is 5.7 miles. The mean range of tide is about 0.8 foot at the
mouth and 0.5 foot at the head of navigation at low-river stage. The
extreme range is about 1.3 feet at the mouth and 0.8 foot at the head
of navigation. Flood conditions raise the water level about 1.5 feet
at the head of navigation and about 1 foot at the mouth. Strong
westerly winds raise the water level about 1 foot and strong easterly
winds lower the water level about 0.7 foot. The estimate of cost for
new work, made in 1900, was $2,500. The latest (1928) approved
estimate for annual cost of maintenance is $500.
   The existing project was adopted by the River and Harbor Act of
June 13, 1902 (H. Doc. No. 318, 56th Cong., 1st sess.). No map of
the river has been published.
   Terminal facilities.-Several small landing platforms have been
built near the packing houses along the banks.
   Operations and results during fiscal year.-The U. S. derrick boat
D-1 was employed June 8 to 9, 1937, in removing 835 obstructions,
consisting of leaning and fallen trees, loose and floating logs, and
other menaces to navigation, over a distance of 3 miles. The cost
was $650.06 for maintenance, and the expenditures were $182.71.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1903, at a saving of $500 under the estimated cost. Project
depth exists except for a short shoal area near the river's mouth,
where the controlling depth is about 3 feet. The waterway has re-
cently been cleared of leaning and fallen trees, loose and floating
logs, and other similar menaces to navigation. The costs of the
existing project have been $2,000 for new work and $8,571.35 for
maintenance, a total of $10,571.35. The expenditures have been
$10,104.
   Proposed operations.-The balance unexpended on July 1, 1937,
amounting to $617.29, less accounts payable amounting to $467.35,
is available for revocation.
618         REPORT OF CHIEF OF ENGINEERS, U: S. ARMY, 1937

  The additional sum of $1,500 can be profitably expended during
the fiscal year 1939 in maintenance dredging under contract to
restore project depth during 1938.
                                Cost and financial summary

Cost of new work to June 30, 1937-_ -     ______                   $2, 000.00
Cost of maintenance to June 30, 1937------------------------------ 8, 571. 35

     Total cost of permanent work to June 30, 1937                                   -            -       10, 571. 35
Minus accounts payable June 30, 1937-     ____                                                                467. 35

     Net total expenditures___-_-______-_                                   _                             10, 104. 00
Unexpended balance June 30, 1937-___                                                                          617.29
        Total amount appropriated to June 30, 1937---------------- 10, 721. 29

                 Fiscal sear ending June 30                        1933      1934          1935         1936      1937


Cost of new work...-------------------------------------------------------------                                 ------
Cost of maintenance--___ ------------------------    -------- -------- -------- --                               $650.06
Total expended....-----------------------------------          -------- -------- -------- --------                182. 71
Allotted-----------          --------------------------------------------------                                   800.00


Amount allotted from War Department Appropriation Act approved
  May 15, 1936--------------------------------------------                                                     $800. 00
Gross amount expended -----------------                                                                         182. 71
      Balance unexpended June 30, 1937--------------------------                                                617. 29
Outstanding liabilities June 30, 1937-----------------------------                                              467. 35
        Balance available June 30, 1937__                                                                       149. 94
Amount that can be profitably expended in fiscal year ending June
                                                        -- -    -- --- --       - --- --
   30, 1939, for maintenance           _                                                              __1,      500. 00
  1Exclusive of available funds.

                            16. CHARLOTTE HARBOR, FLA.

  Location.-This harbor is a large bay on the west coast of Florida.
The entrance is 70 miles south of the entrance to Tampa Bay and
150 miles north of Key West. (See U. S. Coast and Geodetic Survey
Charts Nos. 474 and 1255.)
  Previous projects.-Appropriationsfor removing obstructions were
made in 1881, 1882, and 1886. Improvement of Charlotte Harbor
and Peace Creek was authorized by acts of September 19, 1890, and
June 13, 1902. The cost and expenditures were $119,000, all for new
work. For further details see page 152 of Annual Report for 1890,
page 1828 of Annual Report for 1915, and page 291 of Annual Report
for 1904.
  Existing project.-This provides for dredging a channel 30 feet
deep at mean-low water and 300 feet wide, increased to 700 feet wide
at the bend, from the Gulf of Mexico to South Boca Grande, just
inside the entrance, thence 10 feet deep and 100 feet wide from deep
water at Boca Grande to the end of the municipal terminal at Maud
Street, Punta Gorda, with a turning basin 200 feet square at the
outer end of the terminal. The mean range of tide is 1 foot at
South Boca Grande and 1.4 feet at Punta Gorda. The extreme range
is about 2 feet. Strong southwesterly winds raise the water level
       RIVERS AND HARBORS-JACKSONVILLE,           FLA., DISTRICT    619

about 11/2 feet. Strong northerly and easterly winds lower the water
level about 1 foot.
    The estimate of cost for new work, revised in 1937, exclusive of
amount expended on previous projects, and exclusive of $15,562 con-
tributed by local interests, was $151,600. The latest (1937) approved
estimate of cost for annual maintenance is $29,000.
    The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912 (H. Doc. No. 699, 62d Cong.,
2d sess.), provided for a depth of 24 feet at the entrance; the act of
March 3, 1925 (H. Doc. No. 113, 66th Cong., 1st sess.), provided for
a depth of 27 feet at the entrance and a width of 500 feet at the bend;
the act of July 3, 1930 (Rivers and Harbors Committee Doc. No. 1,
70th Cong., 1st sess.), provided for the turning basin and the 10-foot
depth to Punta Gorda; and the act of August 26, 1937 (Rivers and
Harbors Committee Doc. No. 95, 74th Cong., 2d sess.), provided for
the 30-foot depth at the entrance and the 700-foot width at the bend.
The latest published maps are in the two last-mentioned documents.
    Local cooperation.-Fully complied with.
    Terminal facilities.--These consist of a phosphate wharf at South
Boca Grande and a municipal earth-fill pier about 850 feet long,
retained by steel-sheet piling, at Punta Gorda. Both wharves are
open to the public. The facilities are considered adequate for the
needs of the present commerce. (For further details see Port Series
No. 8, Corps of Engineers.)
    Operations and results during fiscal year.-Maintenance dredging
to a depth of 27 feet in the entrance channel from the Gulf of Mexico
to South Boca Grande with the U. S. seagoing hopper dredge
Chinook, in progress at the beginning of the fiscal year, was com-
pleted August 13, 1936. There were removed 410,160 cubic yards, bin
measurement, of material at a cost of $56,493.83. The expenditures
were $72,993.31.
    Condition at end of fiscal year.-The existing project is 61 percent
completed. A channel has been dredged 27 feet deep and 300 feet
wide, increased to 500 feet wide at the bend, from the Gulf of
Mexico to South Boca Grande. The project-dimension channel from
that point to Punta Gorda, and the turning basin at Punta Gorda,
have been completed. The controlling depths at mean low water
were 27 feet from the Gulf of Mexico through the bar to South Boca
Grande and thence 10 feet to the municipal terminal at Punta Gorda,
ascertained in August and June 1936, respectively. The work re-
maining to be done to complete the project is the deepening of the
entrance channel from the Gulf of Mexico to South Boca Grande
to 30 feet and its widening to 700 feet at the bend as authorized
by the River and Harbor Act approved August 26, 1937. The costs
and expenditures under the existing project have been $92,531.80 for
new work and $347,496.66 for maintenance, a total of $440,028.46.
In addition, $15,562.78 was expended for new work from funds con-
tributed by local interests.
   Proposed operations.-No funds are available and no operations.
are proposed during the fiscal year 1938.
   The sum of $59,000 can be profitably expended during the fiscal
year 1939 for new work dredging with a United States hopper dredge
during the period November-December 1938, as required to deepen
the entrance channel to a depth of 30 feet.
620          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                   Cost and financial summary

Cost of new work to June 30, 1937---------------------------$211,      531. 80
Cost of maintenance to June 30, 1937---- -------------    __      347, 496. 66

      Total cost of permanent work to June 30, 1937----------     559, 028. 46
Net total expenditures- _----_------------  ---       __         559, 028. 46
Total amount appropriated to June 30, 1937--- __--------      - 1559, 028.46

   Fiscal year ending June 30             1933         1934           1935          1936             1937


Cost of new work..................-........................
Cost of maintenance---------------.----------------                    $398.75    $16, 499.48       $56,493.83
Total expended-----------------------------------------                398.75 --------------         72, 993.31

Allotted.------------------         ---    $98. 14      $58, 000   -57, 601.25     73, 000. 00          -6. 69


Balance unexpended July 1, 1936_-_-.-__     --------
                                             --.                                   _-_           $73,000.00
Deductions on account of revocation of allotment- ..--                                   --.           6. 69

        Net amount to be accounted for----- ---------------                              __       72, 993. 31

Gross amount expended ------------------------- $73,003.31
Less reimbursements collected__-_-----------------   10.00
                                                                                                  72, 993. 31
Amount (estimated) required to be appropriated for completion
of existing project----------------------------                                                 59,000.00
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for new work_----- ----                                               _-             59, 000. 00
  1In  addition, $15,562.78 expended from contributed funds.

                     17. CASEYS PASS                 (VENICE INLET),             FLA.

   Location.--Located on the west coast of Florida at the southerly
end of Sarasota Bay, about 180 miles north of Key West and 38
miles south of the entrance to Tampa Bay. (See U. S. Coast and
Geodetic Survey Chart No. 1256.)
   Existing project.-This provides for dredging a new outlet chan-
nel 8 feet deep and 100 feet wide at right angles to the general
trend of the shore line and affording the shortest and most direct
route connecting deep water in Roberts. Bay with deep water in
the Gulf of Mexico, and to protect this channel with two converg-
ing jetties. The mean range of tide is 1.5 feet, and the spring
range is about 2 feet. Strong southwesterly winds raise the water
level about 1 foot. Strong northerly winds lower the water level
about 1.5 feet.
   The estimate of the cost of new work, revised in 1937, is $175,000.
The existing project was authorized by the River and Harbor Act
of August 30, 1935. There is no approved estimate of cost for
annual maintenance (report of the Chief of Engineers, dated June
5, 1935).
   Terminal facilities.-None, other than several improvised land-
ings used by fishing boats. These facilities appear to be adequate
for present commerce.
   Operations and results during fiscal year.--Under a contract for
the construction of two steel sheet pile jetties and creosoted wood
sheet pile bulkheads connecting the jetties with the shore, work was
commenced February 6, 1937, and was about 84 percent completed at
the close of the year. The two jetties, each 659.4 feet long, were
        RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                     621

completed except for the completion of the grouted stone capping
and minor items of welding and painting. The north bulkhead,
692.3 feet long was completed for a distance of 392.7 feet, and the
south bulkhead, 971.3 feet long, was completed for a distance of
671.7 linear feet. The cost was $115,968.45 for new work. Under
a contract for dredging an entrance channel 8 feet deep and 100 feet
wide from the Gulf of Mexico to deep water in Roberts Bay, work
was commenced June 19, 1937, and at the close of the year the
channel had been completed for a distance of 541 linear feet by
the removal of 6,241 cubic yards of material at a cost of $1,367.13
for new work. The costs of hired labor surveys preliminary to
jetty construction and dredging were $2,500.38 for new work. The
total costs for the year were $119,835.96 for new work and the total
expenditures were $72,659.19.
   Condition at end of fiscal year.-The existing project is about 68
percent completed. Two parallel jetties 300 feet apart, with tops 6
feet above mean low water, each 659.4 feet long and consisting of
steel sheet pile cylinders connected by steel sheet pile curtain walls
have been constructed from the 8-foot depth contour in the Gulf of
Mexico to the shore line except for the completion of capping and
other minor items of work. The shore ends of the jetties are con-
nected to the land points with creosoted wooden sheet pile bulkheads,
the construction of which is in progress. The north bulkhead has
been completed for a distance of 392.7 linear feet and the south bulk-
head for 671.7 linear feet. The dredging of an entrance channel
through the inlet 8 feet deep and 100 feet wide is about 10 percent
completed. The controlling depth, in June 1937, was 4 feet for a
width of 100 feet. The work remaining to be done to complete
the project is the completion of the construction of the jetties and
wooden bulkheads at the entrance and of the dredging of the entrance
channel.
   The total cost has been $119,835.96 for new work and the expendi-
tures have been $72,659.19.
   Proposed operations.--The balance unexpended on July 1, 1937
($84,340.81), will be applied as follows:
Accounts payable June 30, 1937---------------------------           $47,176. 77
New work :
    Complete, during August 1937, existing contract for the con-
     struction of two steel-sheet pile jetties and creosoted wooden
     bulkheads------------------------------------------             25,164.04
    Complete, during October 1937, existing contract for dredg-
     ing to provide an 8-foot by 100-foot channel between the
     jetties connecting deep water in the Gulf of Mexico with
     deep water in Roberts Bay----------------------------           12, 000. 00
        Total for new work-------------------------------             84, 340.81
  No funds can be profitably expended during the fiscal year ending
June 30, 1939, as the condition of the project is expected to meet
the needs of commerce during the next 2 years.
                         Cost and financial summary

Cost of new work to June 30, 1937-------------------------$119, 835. 96
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937                  119, 835. 96
               S:EPORT OF CHIEF: OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937                                    --        -                                           $47, 176. 77

          Net     total expenditures---                                  __-----------------                                   72, 659. 19
Unexpenided balance June 30, 1937--___________________                                                         --------        84, 340. 81

         Total amount appropriated to June 30, 1937--------------_                                                            157, 000. 00

          Fiscal year ending June 30                         1933                 1934                  1935           1936        1937

Cost of new work---..-............                      . ...------------------------..------------..
                                                                                             .        --------- $119,835. 96
Cost ofmaintenance..--------------............----...-------------- --..---------                   -----...              ............--------
Total expended---------------------
            .........................                                 -------------------------------                             72, 659.19

Allotted--..........
                 -.  .                  -          ----------------
                                            ..---------- .-                                ----------------------                157,000.00


Amount allotted from War Department Appropriation Act
  approved May 15, 1936                                                  000. 00
                                                                    $-------------------
Gross amount expended----------------                   $72, 683.62
Less reimbursements collected------------------------__       24.43
                                                                     72, 659.19
          Balance unexpended June 30, 1937---------                                                              ---           84, 340. 81
Outstanding liabilities June 30, 1937------------------$47,176. 77
Amount        covered       by     uncompleted              contracts            ---          ---          37, 164. 04
                                                                                                                               84, 340. 81

                                         18. SARASOTA BAY, FLA.

   Location.-This is a shallow sound on the west coast of the penin-
sula of Florida separated from the Gulf of Mexico by a chain of low
sand keys. At its northern end it connects with the southern extrem-
ity of Tampa Bay. (See U. S. Coast and Geodetic Survey Chart
No. 1256.)
   Previous projects.-Adopted by River and Harbor Acts of Septem-
ber 19, 1890, June 3, 1896, and March 2, 1907. The cost and expendi-
tures on these projects were $125,000.50, of which $75,854.45 was for
new work and $49,146.05 for maintenance. For further details see
page 776 of Annual Report for 1918.
   Existing project.-This provides for a channel 100 feet wide and
7 feet deep at mean low water from Tampa Bay through Sarasota
Bay to Sarasota by way of Bulkhead Cut and a channel located just
east of Picket and Jewfish Keys, and thence through Long Key Cut,
and thence 75 feet wide and 3 feet deep at mean low water through
Little Sarasota Bay to Nokomis (formerly Venice), by dredging
through shoals. The length of the section covered by the project is
38 miles. The mean tidal range is 1.5 feet. The spring range is 2
feet. Strong southwesterly winds raise the water level about 1 foot.
Strong northerly winds lower the water level about 1.5 feet. North-
erly winds prevail during the winter months and southerly winds
during the summer months. The water level is usually lower in the
winter than at other times.
   The estimate of cost for new work, revised in 1937, is $231,500, ex-
clusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $6,000. The
River and Harbor Act of March 2, 1919, provided for a channel with
            RIVERS AND HARBORS-JACKSONVILLE,                                                   FLA., DISTRICT                623

project dimensions through Sarasota Bay by way of Longboat Inlet
and the channel through Little Sarasota Bay (H. Doc. No: 844, 63d
Cong., 2d sess.); the ]iver and Harbor Act of August 26, 1937, pro-
vided, in lieu of the channel near Longboat Inlet, a moreprotected
channel located just east of Picket and Jewfish Keys (H. Doc. No.
80, 75th Cong., 1st sess.). The latest published maps are in the
project documents.
   Terminal facilities.---Consist of 1 municipal concrete._pier, 1 rail-
way pier, 1 freight ,wharf, and 10 privately owned boat landings.
The municipal pier and the freight wharf are open to the public;
the railway pier is used mainly for storing private Pullman cars
and occasionally for transshipment of lumber and building material
to nearby keys. A marginal dock, 500 feet long, has been constructed
along the terminal island. The facilities are considered adequate for
the present needs.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project is about 60 percent
completed. The project waterway, as dredged through Sarasota
Bay, included a channel near Longboat Inlet. In Little Sarasota
Bay channels 4 feet deep and from 50 to 75 feet wide have been
dredged. The controlling depths at mean low water were 7 feet
for a width of 100 feet from Tampa Bay to Sarasota, by way of
Longboat Inlet, ascertained in February 1937, and thence 3 feet for
a width of 40 feet to Venice, ascertained in June 1937. The work
remaining to be done to complete the project is the dredging of a
channel just east of Picket and Jewfish Keys, in lieu of the existing
channel near Longboat Inlet, and the widening of the channel in
Little Sarasota Bay, involving rock removal, principally at Man-
grove Cut. The costs and expenditures under the existing project
have been $139,686.46 for new work and $71,509.03 for maintenance, a
total of $211,195.49.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $38,000 can be profitably expended during the fiscal
year 1939 for new work dredging by contract, during the period
October 1938-January 1939, as required to construct a 7- by 100-foot
relocation channel in the vicinity of Longboat Inlet.
                                                   Cost and financial summary
Cost of new work to June 30, 1937                                                                _    _-------------------------
                                                                                                               $215, 540. 91
Cost of maintenance to June 30, 1937----------------                                           __       _       120, 655. 08
      Total cost of permanent work to June 30, 1937____________                                                     336,195. 99
Net total expenditures---------    --------------------------                                                       336, 195. 99
Total amount appropriated to June 30, 1937__                                                                        336,195.99

    Fiscal year ending June 30                          1933          1934              1935          1936              1937


Cost of new work...............
Cost of maintenance------------............          -$7, 213. 36    $5, 439.38 -..------------      $5,932. 11 .       --     _
Total expended-.............                        -...-4, 573.12       358.41 -------------         5, 932. 11        _

Allotted_--_                                  --     -35, 030. 04    -5, 206. 08   ...-----------     7, 000. 00       -$1,067. 89


           20196-37-pt. 1-40
624      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936--------     -       -    -  ----- ---  $1, 067. 89
Deductions on account of revocation of allotment ----------------     -1, 067. 89
Amount (estimated) required to be appropriated for completion of
  existing project-----    ----------------------------------          92, 000.00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work ..---.--------       ----------------------   38, 000. 00
                         19. MANATEE RIVER, FLA.

    Location.---This river rises in the western part of the peninsula
of Florida and flows westwardly, emptying into the southern end
of Tampa Bay near the entrance. (See U. S. Coast and Geodetic
Survey Chart No. 586.) Its total length is about 45 miles.
    Existing project.-This provides for a channel 100 feet wide and
13 feet deep at mean low water from Tampa Bay by Shaws Point
to McNeills Point (4 miles), 100 feet wide and 9 feet deep at mean
low water to Rocky Bluff (8 miles), and 75 feet wide and 4 feet deep
to Mitchellville Bridge (113/4 miles), with a cut-off 100 feet wide and
6 feet deep from the river 21/2 miles above its mouth into Terra
Ceia Bay by dredging. The length of the section included in the
project is 233/4 miles in the river and 0.66 mile in Terra Ceia cut-off.
    The mean range of tide is 1.6 feet at the mouth of the river, 1.3
feet at Rocky Bluff, and at low-river stage the tide is perceptible
at Rye.
    The estimate of cost for new work, revised in 1916, is $137,710.
The latest (1915) approved estimate of cost for annual maintenance
is $5,000.
    The existing project was authorized by the following river and
harbor acts: The act of August 2, 1882, provided for the improve-
ment from Tampa Bay to McNeills Point (Annual Report for 1882,
p. 1319); act of June 3, 1896, provided for a cut-off into Terra
Ceia Bay; the act of March 3, 1905, extended the improvement to
Rye (H. Doc. No. 117, 58th Cong., 2d sess.) ; and the act of July 27,
1916, fixes the upper limit of the improvement at the Mitchellville
Bridge. The latest published map is in Rivers and Harbors Com-
mittee Document No. 2, Sixty-fourth Congress, first session.
   Terminal facilities.-These consist of four freight piers, having a
total frontage of 1,225 feet, and without railway connections. The
facilities are considered adequate for the present needs and are open
to the public.
    Operations and results during fiscal year.-None. The cost in-
curred in connection with work performed during the previous fiscal
year was $70.02 for maintenance. The expenditures were $7,968.17.
   Condition at end of fiscal year.--The existing project is 90 percent
completed, the greater part of the work having been completed dur-
ing the calendar year 1915. Channels of project dimensions have
been dredged as contemplated except for about 200 feet on the outer
bar, where the depth was 1 foot less than project depth. The con-
trolling depths at mean low water when last ascertained were as
follows: Tampa Bay by Shaws Point to McNeills Point, 11.5 feet
for a width of 90 feet in October 1935; thence to Rocky Bluff, 7.5
feet for a width of 90 feet in October 1935; thence to Mitchellville
Bridge, 4 feet for a width of 50 feet in June 1936; and in the Terra
Ceia cut-off, 5.5 feet for a width of 90 feet in May 1933. To com-
plete the project a small amount of rock found at a depth of 12
eet must be removed from the cut at the entrance.
             RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                                                     625
  The costs and expenditures have been $123,349.56 for new work
and $93,697.69 for maintenance, a total of $217,047.25.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  No funds can be profitably expended during the fiscal year 1939,
as the condition of the project is expected to meet the needs of com-
merce during the next 2 years.
                                    Cost and financial summary

Cost of new work to June 30, 1937--------------------      ---- $123, 349. 56
Cost of maintenance to June 30, 1937-------------------------     93, 697. 69

      Total cost of permanent work to June 30, 1937------------                                         217, 047. 25
Net total expenditures--------------------------_                                                       217, 047. 25
Total amount appropriated to June 30, 1937 ----------------                                             217, 047. 25

           Fiscal year ending June 30             1933             1934             1935        '1936          1937


Cost of new work.............................                  ......
                                                              ............................                        6.
Cost of maintenance---------- ------------                 --------          ---------       $11, 925.23         $70.02
Total expended-----------------             ------------   -----------------------             4,027.08        7,968.17
Allotted             ---------------------------------------------------------                13,000.00      --1,004. 7


Balance unexpended July 1, 1936----------------------------                                                $8, 972.92
Deductions on account of revocation of allotment ----------                                                 1, 004. 75

      Net amount to be accounted for-------------------------  7, 968. 17
Gross amount expended__---------------------------------
Amount (estimated) required to be appropriated for completion
                                                               7,      17                                     968.
  of existing project---------   ----------------             14, 400. 00
                                   20. TAMPA HARBOR, FLA.

  Location.-This harbor is a large natural indentation of the Gulf
of Mexico approximately midway of the western coast of the penin-
sula of Florida. The entrance is about 220 miles north of Key West,
about 330 miles from Pensacola, 360 miles from Mobile, and 512 miles
from New Orleans. (See U. S. Coast and Geodetic Survey Charts
Nos. 586 and 587.)
  Previous projects.--Adopted by the following River and Harbor
Acts--for Tampa Bay: acts of June 14, 1880, and August 11, 1888.
The amount expended on these projects was $130,000 for new work.
  For Tampa and Hillsboro Bays: acts of June 14, 1880, March 2,
1899, and March 3, 1905. The amount expended on these projects
was $740,157.70, of which $723,050.46 was for new work and $17,107.24
was for maintenance. In addition, $80,000 was spent for new work
in Hillsboro Bay, which was appropriated under the head of Tampa
Bay, and is included in the expenditure reported under that head.
The total expenditure above reported includes $96,832.91 expended in
Hillsboro River under the project of March 3, 1899.
  For Hillsboro River: act of June 14, 1880.
  The total expenditure under previous projects was $870,157.70.
  For further details see pages 1829, 1830, and 1831 of the Annual
Report for 1915.
  Existing project.-This provides for a depth of 32 feet at mean
low water and a width of 600 feet on Egmont Bar; a depth of 30
626     REPORT OF CHIEF 'OF ENGINEERS, U. S. ARMY, 1937

feet'and a width of 400 feet in Mullet Key Cut; a depth of 30 feet and
a width of 300 -feet in Tampa Bay Channel, H-Iillsboro Channel,
Sparkman Channel, Ybor Channel, Garrison Channel, Seddon Chan-
nel, and Port Tampa Channel; and turning basins 30 feet deep at the
mouth of Hillsboro River, at the entrance to Ybor Channel, and at
the entrance to the Port Tampa terminals, the latter to be 2,000
feet long and 550 feet in maximum width; and for securing and
maintaining by dredging a channel 2,400 feet long and 200 feet wide
and 12 feet deep at mean low water in Hillsboro River from a point
100 feet south of the Lafayette Street Bridge to the turning basin at
the mouth of the river.
   The mean range of tide is 1.3 feet at the lower end of the bay, 1.6
feet at Port Tampa, and 1.8 feet. at Tampa. The spring range is
1.6 feet at the lower end of the bay and 2.3 feet at Tampa and Port
Tampa. Strong southwesterly winds raise the water level about 1.5
feet. Strong northerly winds, which usually occur in the winter
months, lower the water level about 2 feet.
   The estimate of cost for new work, revised in 1937, is $8,220,000,
exclusive of amounts expended on previous projects. The. latest
 (1935) approved estimate of cost for annual maintenance is $125,000.
   The existing consolidated project is derived from the following
detailed projects and authorized by the river and harbor acts indi-
cated :
   For Tampa Bay: act of March 3, 1899 (H. Doc. No. 52, 55th
Cong., 3d sess.), and modified by act of March 3, 1905, which fixed
the dimensions of the channel as 26 feet deep with sufficient width.
The latest published map is in House Document No. 88, Fifty-fifth
Congress, first session.
   For Tampa and Hillsboro Bays: The act of June 25, 1910, pro-
vided for channel 24 feet deep in Hillsboro Bay (H. Doc. No. 634,
61st Cong., 2d sess.); the act of August 8, 1917, provided for the
27-foot depth from the Gulf of Mexico up to and in the several
channels of Hillsboro Bay (H. Doc. No. 1345, 64th Cong., 1st sess).
The latest published maps are in House Document No. 634, Sixty-first
Congress, second session; Annual Report for 1914, page 2130; House
Document No. 1345, Sixty-fourth Congress, first session; and Senate
Document No. 22, Seventy-second Congress, first session.
   For Hillsboro River: Act of March 3, 1899, under the title of "Im-
proving Hillsboro Bay, Fla." (H. Doc. No. 545, 55th Cong., 2d
sess.). The latest published maps are in House Document No. 132.
Sixty-third Congress, first session.
   The River and Harbor Act of September 22, 1922, authorized the
consolidation of the above projects to form a single project for
Tampa Harbor. The River and Harbor Act of July 3,1930, provided
for increasing the depth of Egmont Channel to 29 feet and the width
of Sparkman Channel to 300 feet (H. Doc. No. 100, 70th Cong.,
1st sess.).
   The Public Works Administration on September 6, 1933, and the
River and Harbor Act of August 30, 1935, authorized the following:
Deepening Egmont Channel to 32 feet and increasing the width to
600 feet; deepening all other project channels, except in Hillsboro
River, to 30 feet; widening Mullet Key Cut to 400 feet; widening
Hillsboro Channel and Seddon Channel to 300 feet; and a turning
basin 30 feet deep, 2,000 feet ]ong, and 550 feet in maximum width
       RIVERS AND HARBORS--JACKSONVILLE, FLA., DISTRICT             627

at the entrance to the Port Tampa terminals (S. Doc. No. 22, 72d
Cong., 1st sess.). The latest published map is in the last-mentioned
document.
   Local cooperation.-The work authorized by the River and Harbor
Act of August 30, 1935, and included in the Public Works program
is subject to the provision that local interests furnish, free of cost to
the United States, all spoil-disposal areas necessary for the work,
and furnish an acceptable permanent site for a United States reser-
vation and dredge depot. The spoil-disposal areas have been fur-
nished. A resolution of the board of representatives of the city of
Tampa was accepted by the Chief of Engineers July 12, 1935, as
satisfactory assurance that a site for a dredge depot will be provided.
All prior requirements have been fully complied with.
   Terminal facilities.-The municipal terminals consist of a slip
805 feet long, 250 feet wide, and 27 feet deep. A transit shed 750
feet long and 75 feet wide is situated on one side of the slip and on
the other side there is an open storage yard. The slip has railway
and highway connections. The city of Tampa also owns and op-
erates one small wharf. In addition to the above, there are 32 piers
and wharves at Tampa and 7 at Port Tampa with depths of from
5 to 27 feet. All but eight are open to the public on the payment
of wharfage charges.
   On the east shore of Hillsboro Bay there are two large phosphate
plants, each providing about 1,000 feet of berthing space with pri-
vately dredged channels 23 and 27 feet deep connecting with the
Hillsboro Channel of the Tampa Harbor project. The facilities are
considered adequate for existing commerce. (See Port Series No.
8, pt. 2, revised 1936, Corps of Engineers.)
   Operations and results during fiscal year.-The U. S. seagoing
hopper-dredge Chinook was employed from August 18 to October
13, 1936, in maintenance dredging in the old alinemenit of Egmont
Channel, removing 504,352 cubic yards, bin measurement, of ma-
terial from 17,400 linear feet of channel and obtaining a controlling
depth of 30.6 feet, at a cost of $64,555.34. The U. S. seagoing
hopper-dredge Absecon was employed in maintenance dredging to a
depth of 30 feet from November 19, 1936, to February 12, 1937, from
March 15 to April 22, 1937, and from May 26 to the close of the
fiscal year, removing 66,173 cubic yards, bin measurement, of ma-
terial from 1,100 linear feet of Port Tampa Channel and 1,093,469
cubic yards, bin measurement, of material from 43,307 linear feet
of Hillsboro Bay Channel, where work was in progress at the close
of the fiscal year, at a total cost of $96,779.23. The costs incurred
in connection with dredging completed during the latter part of
the previous fiscal year were $3,292.89 for new work and $1,111.59
for maintenance. The cost of surveys and contingencies incidental to
future dredging and supervision of the project was $6,849.36 for
maintenance.
   The costs for the year were $3,292.89 for new work and $169,295.52
for maintenance, a total of $172,588.41, all regular funds. The ex-
penditures were $263,411.11 from regular funds and $63,698.06 from
Emergency Relief funds, a total of $327,109.17.
   Condition at end of fscal year.-The existing project is about 96
percent completed. The Hillsboro River project was completed in
1905. The turning basin at Port Tampa has been constructed 2,750
628       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

feet long by widening on the westerly side of the Port Tampa Chan.
nel at its junction with the turning basin. The controlling di-
mensions, when last ascertained, were as follows: Old Egmont
Channel at the entrance to Tampa Bay, 30 feet for a width of 400
feet, and Egmont Relocation Channel, 26 feet for a width of 200 feet,
in May 1937; Mullet Key Cut, 30 feet for a width of 400 feet, in
May 1936; Tampa Bay Channel, 30 feet for a width of 275 feet, and
Port Tampa Channel, 30 feet for a width of 300 feet, in April 1937;
Hillsboro Bay Channel, 29.9 feet for a width of 250 feet, in June
1937; Seddon and Sparkman Channels, 30 feet for a width of 300
feet, in March 1937; Ybor and Garrison Channels, 30 feet for a
width of 300 feet, in June 1936; and in Hillsboro River, 12 feet for
a width of 100 feet, in January 1936. The work remaining to be
done to complete the project is the completion of dredging in the
realinement of Egmont Channel.
   Under regular funds, the costs of the existing project have been
$5,092,200.77 for new work and $1,381,880.52 for maintenance, a
total of $6,474,081.29, and the expenditures have been $6,472,190.49.
Under Public Works funds, the cost and expenditures have been
$1,329,333.24 for new work. Under Emergency Relief funds, the
costs and expenditures have been $1,463,000 for new work. The
total cost, all funds, has been $9,266,414.53, of which $7,884,534.01
was for new work and $1,381,880.52 for maintenance. The total
expenditures have been $9,264,523.73.
   Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1937, together with an allotment of $45,000 made
during July 1937, a total of $108,399.95, and an allotment of $160,525-
to be made later will be applied as follows:
Accounts payable June 30, 1937---------------------------------           $19, 924.94
New work: Dredging in Egmont Relocation Channel December 1937-
  June 1938-----        -------------------------------------             175,000.00-
Maintenance:
    Dredging in Hillsboro Bay Channel and Tampa Bay
      Channel with U. S. hopper dredge Absecon, 2
      months, July-August 1937--------------------            $33, 475.01
    Dredging with U. S. hopper dredge Absecon, 2Y2
      months, April-June 1938, removing shoals through-
      out the project-----------------------------40, 525. 00
                                                                           74, 000.01
      Total for all work   ----------------------------------- 268, 924. 95
  The additional sum of $286,000 can be profitably expended during
the fiscal year 1939 as follows:
New work: Begin during July 1938 and complete during June 1939,
  with a United States hopper dredge, the dredging of Egmont Reloca-
tion Channel-------------------- ---          -- ------------------ $161, 000
Maintenance: Dredging with a United States hopper dredge, 7 months
  November 1938-May 1939, removing shoals throughout the project
as required          ----------------------------------------------  125, 000

      Total for all work_-------------------------------------                286, 000
                             Cost and financial summary
Cost of new work to June 30, 1937-----------------                 -- $8, 737, 584. 47
Cost of maintenance to June 30, 1937---...                  ---.        1, 308, 987. 76.
      Total cost of permanent work to June 30, 1937---------          10, 136, 572.23.
  1Includes $1,329,333.24 Public Works funds and $1,463,000 Emergency Relief funds,
               RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                                                             629
Undistributed costs June 30, 1937--------------------------                                                        $12, 885. 37

      Net total cost to June 30, 1937____---------------------                                               10,149, 457. 60
Plus accounts receivable June 30, 1937-___ ------------------                                                     5, 148. 77

      Gross total costs to June 30, 1937____-----------                                                      10,154, 606. 37
Minus accounts payable June 30, 1937--__- ----------------                                                       19, 924. 94

      Net total expenditures --------------------------                                                     110,   134, 681. 43
Unexpended balance June 30, 1937------___-----------------                                                          58, 251. 18

            Total amount appropriated to June 30, 1937 ----------- 110, 192, 932. 61

   Fiscal year ending June 30                    1933           1934              1935               1936               1937

Cost of new work------------..............   $128, 768. 52   $519, 558.58      $961, 399. 75   $1, 619, 547. 70         $3, 292. 89
Cost of maintenance-----------...........      56, 750. 55     43, 474. 73       28, 740. 31        45,422. 57         169, 295. 52
        Total cost.--------------             185, 519.07     563, 033. 31      990, 140. 06    1,664, 970. 27         172, 588. 41
                              127, 655. 70
Total expended--................                             478, 298.47        920, 224. 03    1, 484, 690. 37        327, 109. 17

Allotted.. ...-.-.-.......   --               285, 787. 68   789, 763.08      1,912, 397. 65      560, 472.65        -214,000.00


Balance unexpended July 1, 1936_             __ _ _____        _                                                  $599, 360. 35
Amount allotted from War Department Appropria-
  tion Act approved April 9, 1935 ---       ____-$16, 255. 94
                                          -__
Amount allotted from War Department Appropria-
  tion Act approved May 15, 19368_________ ____     19, 744. 06
                                                                                                                    36, 000. 00
      Amount to be accounted for__                                                                                 635, 360. 35
Deductions on account of revocation of allotment.                                                                  250, 000. 00

      Net amount to be accounted for__                                                                             385, 360. 35
Gross amount expended ____- _______-____       __                                        440, 604. 84
Less-
    Reimbursements collected- ----- $113, 395.67
    Receipts from sales                   100. 00
                                                                                         113, 495. 67
                                                                                                                   327, 109. 17
      Balance unexpended June 30, 1937_                                             --    _     -_                  58, 251. 18
Outstanding liabilities June 30, 1937_                                                                              19, 924. 94
      Balance available June 30, 1937..                                                   ..                        38, 326. 24
Accounts receivable June 30, 1937_____                                       ______________                          5, 148. 77
     Unobligated balance available June 30, 1937___ __ __ ..                                                        43, 475.01
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937_____-____-__-___ ____          __                                                       45, 000. 00
           Balance available for fiscal year 1938------------------                                                 88, 475. 01

Amount (estimated) required to be appropriated for completion
of existing project 2----------------------------------------                                                     161, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                    161, 000. 00
   For maintenance 2--- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                    125, 000. 00
                         - --- - - - - - - - -     - - -- - -- - ---- ---- ----- ----          --- -
             Total                                                                                                 286, 000.00
   1 Includes $1,329,333.24 Public Works funds and $1,463,000 Emergency Relief funds.
   2 Exclusive of available funds.
630     REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY, 1937

                 21. ST. PETERSBURG HARBOR, FLA.

   Location.-St. Petersburg is situated on the west shore of Tampa
Bay, about 17 miles from the entrance of Tampa Bay, 21 miles from
Tampa, and 83/4 miles from Port Tampa. The entrance to Tampa
Bay, known as Egmont Channel, is on the west coast of Florida,
about 220 miles north of Key West. (See U. S. Coast and Geodetic
Survey Chart No. 587.)
   Previous projects.-Adopted by River and Harbor Acts of July
25, 1912, and August 8, 1917. The cost and expenditures were $53,-
220.25, of which $32,688.62 was for new work and $20,531.63 was for
maintenance. For further details see page 769 of Annual Report
for 1929.
   Existing project.-This provides for a channel 250 feet wide, 19
feet deep, leading westward from that depth in Tampa Bay to the
basin at the port of St. Petersburg, a distance of about 1 mile, and
for a depth of 21 feet, 1,400 to 1,700 feet long and 900 feet wide, in
the Port of St. Petersburg and for a straight channel 20 feet deep
and 200 feet wide extending southward from the easterly end of the
above entrance channel to deep water in Tampa Bay. The plane of
reference in mean low water. The mean range of tide is 1.5 feet.
The spring range is 1.9 feet. Strong southwesterly winds raise the
water level about 1.5 feet. Strong northerly winds, which occur
mostly during the winter months, lower the water level about 2 feet.
   The estimate of cost for new work, revised in 1937, is $184,300,
exclusive of amounts expended on previous projects, but including
$17,000 for the Point Pinellas Channel. The latest (1937) approved
estimate for annual cost of maintenance is $6,500. The existing
project was adopted by the River and Harbor Act of July 3, 1930,
and authorized the 19-foot deep entrance channel and the basin at
the port of St. Petersburg (S. Doc. No. 229, 70th Cong., 2d sess.);
and the River and Harbor Act of August 26, 1937, authorized the
20-foot deep channel leading southward to Tampa Bay (Rivers and
Harbors Committee Doc. No. 71, 74th Cong., 2d sess.). The latest
published maps are in the project documents.
   The Deficiency Act of March 4, 1929, authorized the expenditure
of $17,000 for dredging a channel 16 feet deep and approximately
200 feet wide on the easterly side of Point Pinellas lighted beacon in
a direction approximately 328 ° true, the westerly boundary of the
channel to be dredged as close to the said beacon as practicable.
   Local cooperation.-Fully complied with.
   Terminal facilities.-In Bayboro Harbor are nine privately owned
marginal wharves having a total length of 515 feet. A concrete
municipal quay 800 feet long faces Bayboro Harbor along its north-
east side and a spur of the municipal electric railway has been ex-
tended to this quay. A concrete wharf 1,500 feet long, constructed
by the city of St. Petersburg, extends along the north side of the
dredged basin known as the port of St. Petersburg. The facilities
are considered adequate for present needs.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project is about 33
percent completed. The 19-foot deep entrance channel leading west-
ward from Tampa Bay to the basin at the Port of St. Petersburg
and the turning basin at that port were completed in 1931. In
            RIVERS AND HARBORS-JACKSONVILLE,                                       FLA., DISTRICT          631

1929-30, the Point Pinellas Channel was dredged 6,200 feet long and
200 feet wide, with a controlling depth of 14 feet. The controlling
depths at mean low water are 19 feet for a width of 225 feet in the
entrance channel and 21 feet for an area of 900 by 1,400 feet in the
port of St. Petersburg, ascertained in December 1936, 11.6 feet for a
width of 200 feet in the south channel, ascertained in March 1935,
and 14.5 feet in the Point Pinellas Channel, ascertained in May 1933.
The work remaining to be done to complete the project is the dredg-
ing of a channel 20 feet deep and 200 feet wide from the easterly
end of the present entrance channel southward to Tampa Bay.
  The costs and expenditures under the existing project have been
$61,246.90 for new work, including $17,000 for the Point Pinellas
Channel, and $14,888.72 for maintenance, a total of $76,135.62.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  The sum of $123,000 can be profitably expended during the fiscal
year 1939 for new-work dredging, by contract or by hired labor and
United States hopper dredge, during the period October 1938-Febru-
ary 1939, as required to provide a straight channel 20 feet deep and
200 feet wide from the easterly end of the present entrance channel
southward to deep water in Tampa Bay.
                                     Cost and financial summary

Cost of new work to June 30, 1937---------------------------$93, 935. 52
Cost of maintenance to June 30, 1937         ---------        35, 420. 35
      Total cost of permanent work to June 30, 1937------------129, 355. 87
Net total expenditures_------------------------------------ 129, 355. 87
Total amount appropriated to June 30, 1937-------------------    129,355.87

           Fiscal year ending June 30                 1933           1934         1935        1936        1937


Cost of new work---------                    -----------       ------------ ---------------------- ------------
Cost of maintenance                          ------------
                            .------------------                      $782.04    $14,106.68-------____

Total expended         ........--------------------              -    782. 04   14,106. 68-          .-          .
Allotted       --...       ...
                 --........--                             $15,000 -13,672.99
                                        ....-----------------------             13, 561.71------------


Amount (estimated) required to be appropriated for completion of
existing project -------------   --------------------------     $123, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work---    --   --    --     --   --   --   --                                    123, 000. 00
22. CHANNEL FROM CLEARWATER HARBOR THROUGH BOCA CIEGA
                  BAY TO TAMPA BAY, FLA.

  Location.-Clearwater Harbor and Boca Ciega Bay are sounds on
the west coast of the Peninsula of Florida, north of Tampa Bay,
separated from the Gulf of Mexico by a chain of low sand keys.
With The Narrows, which connects them, they form a part of the
coastal waterway from Tampa Bay to St. Josephs Sound. (See
U. S. Coast and Geodetic Survey Chart No. 1257.)
  Existing project.-This provides for dredging a channel 50 feet
wide and 5 feet deep at mean low water from Clearwater Harbor
to Boca Ciega Bay and through the upper part of said bay, thence
100 feet wide and 8 feet deep at mean low water to Tampa Bay.
632          REPORT OF CHIEF OF ENGINEERS, U. S. AfRMY, 1937

The length of the waterway covered by the project is 26 miles. The
mean range of tide is about 1.8 feet. The spring range is about 2.3
feet. Strong southwesterly winds raise the water level about 1 foot.
Strong northerly winds, which usually occur in the winter months,
lower the water level about 11/2 feet.
   The estimate of cost for new work, revised in 1919, was $101,200.
The latest (1928) approved estimate for annual cost of maintenance
is $6,000.
   The existing project was adopted by the following river and harbor
acts: The act of June 25, 1910, provided for all except the 8-foots
channel (H. Doc. No. 1190, 60th Cong., 2d sess.), and the act of
March 2, 1919, provided for the 8-foot channel (H. Doc. No. 135, 63d
Cong., 1st sess.). The latest published maps are in these documents.
   Terminal facilties.-These consist of six wharves, used for freight
and passengers, having a total berthing space of 540 feet. All have
highway connections, the wharf at Gulfport having connections with
the St. Petersburg Electric Railway also. The facilities are ample
for the needs of the locality and are open to the public.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1920. The controlling depths at mean low water were 8
feet in the entrance channel at Point Pinellas in October 1934 and
4.3 feet in upper Boca Ciega Bay and in Clearwater Harbor in June
1937. The cost and expenditures have been $105,877.01 for new work
and $101,963.72 for maintenance, a total of $207,840.73.
   Proposed operations.-No funds are available and no operations are
proposed during the fiscal year 1938.
   The sum of $12,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging by contract during April and
May 1939.
                                   Cost and financial summary

Cost of new work to June 30, 1937--------------------------                                                           $105, 877. 01
Cost of maintenance to June 30, 1937- ---------------------                                                            101. 963. 72

      Total cost of permanent work to June 30, 1937------------207, 840. 73
Net total expenditures -------   ------------------------------ 207, 840. 73
Total amount appropriated to June 30, 1937---------- --------- 207, 840. 73

        Fiscal year ending June 30                  1933                1934             1935               1936                1937


Cost of new work--   - - - - - -
Cost of maintenance---------------------
                                                     -       --......-
                                                               ------------        $9,    992.50
                                                                                                                -           --    --
                                                 .       .--
Total expended--------....................... ------------                .          9, 992. 50............-.....-------
Allotted-......--...................          ...        .      .       $10, 000          -7.50.................

Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance---------------------------                                                                 $12, 000. 00

                                  23. ANCLOTE RIVER, FLA.

  Location.-Rises in the western part of the peninsula of Florida
and flows southwesterly, emptying into the Gulf of Mexico about
38 miles north of the entrance to Tampa Bay.                                              (See U. S. Coast and
Geodetic Survey Chart No. 1257.)
        RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT           633
    Existing project.-This provides for dredging a channel 100 feet
  wide and 9 feet deep at mean low water, with width increased at en-
trance and at bends from the Gulf of Mexico to the lower end of the
  present turning basin. The length of the section included in the
  project is about 4 miles. The mean range of tide is about 2 feet
  at the entrance and 2 feet at Tarpon Springs. The spring range
  of tide is about 2.6 feet at the entrance and 2.5 feet at Tarpon
 :Springs. Strong southwesterly winds raise the water level about
  1 foot. Strong northerly winds, which occur mostly during the
  winter, lower the water level about 1    to 2 feet.
    The estimate of cost for new work, revised in 1935, is $166,000.
  The latest (1935) approved estimate of cost of annual maintenance
is $8,000.
    The project was adopted by the following river and harbor acts:
  The act of March 3, 1899, provided for a channel 6 feet deep to
  Sponge Harbor and thence 4 feet deep to Tarpon Springs (H. Doc.
No. 200, 55th Cong., 2d sess.); act of January 21, 1927, extended
the 6-foot channel to Tarpon Springs and provided for the turning
basin (H. Doc. No. 18, 63d Cong., 1st sess.); and the act of August

F9
30, 1935, modified the project to provide for increasing the depth to
    feet (Rivers and Harbors Committee Doc. No. 36, 73d Cong., 2d
sess.). The latest published map is in House Document No. 229,
Seventy-second Congress, first session.
    Local cooperation.-The modified project authorized by the River
and Harbor Act of August 30, 1935, is subject to the condition that
no expense shall be incurred by the United States for acquiring any
lands or disposal areas required for the purpose of the improvement.
This condition has been complied with.
    Terminal facilities.-These consist of one municipal marginal
wharf at Tarpon Springs, berthing space 330 feet, with about 5
feet of water, used by sponge and fish boats and small launches.
IHighway connection only is provided. The facilities are considered
inadequate for the needs of the locality.
    Operations and results during fiscal year.-Under a contract for
dredging to provide project dimensions from Anclote Anchorage to
"Tarpon Springs, work was commenced September 30, 1936, and at
the close of the fiscal year was 60 percent completed. The channel
was completed for an aggregate distance of about 12,600 linear feet
by the removal of 179,232 cubic yards of material at a cost of
 $40,689.62. The cost of hired labor surveys preliminary to dredging
was $2,925.10. The total cost for the year was $43,614.72 for new
work and the total expenditures were $39,775.39.
    Condition at end of fiscal year.-The existing project is about 70
percent completed. The deepening of the .channel to project depth
from Anclote Anchorage to Tarpon Springs is in progress and about
,60 percent completed. The present controlling depth is 7 feet for
a width of 100 feet. The work remaining to be done to complete
the project is the completion of the deepening of the channel to
9 feet from Anclote Anchorage to Tarpon Springs under an exist-
ing contract, and the removal of a shoal at the entrance from the
-Gulf   of Mexico to Anclote Anchorage. The costs of the existing
,project have been $119,666.58 for new work and $75,305.37 for main-
634               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

tenance, a total of $194,971.95. The total expenditures have been
$191,132.62.
   Proposed operations.-The balance unexpended on July 1, 1937
 ($59,724.61), will be applied as follows:
Accounts payable June 30, 1937--                             ___      $-------_______
                                                                     $3, 839.33
New work: Complete, during October 1937, existing contract for
  dredging a channel 9 feet deep from Anclote Anchorage to the lower
  end of the present turning basin---___-    -------- ______---       55,885.28

            Total for all work_-----__---------_-----__---                                                             59, 724. 61
  No funds can be profitably expended during the fiscal year 1939
for the relatively small amount of new work remaining to be done
or for maintenance, as the condition of the project is expected to
meet the needs of commerce during the next 2 years.
                                                   Cost and financial summary

Cost of new work to June 30, 1937--------------------------$119, 666. 58
Cost of maintenance to June 30, 1937_---____________________  75, 305. 37
     Total cost of permanent work to June 30, 1937----_______                                                      194, 971. 95
Minus accounts payable June 30, 1937-----         ----------                                                         3,839. 33

     Net total expenditures  ------------------------------                                                        191, 132. 62
Unexpended balance June 30, 1937-----------------------                                                             59, 724. 61

            Total amount appropriated to June 30, 1937-----                                       ----             250, 857.23

            Fiscal year ending June 30                               1933       1934           1935         1936           1937


Cost of new work.... ------------------------------------------------------------                                        $43, 614. 72
Cost of maintenance                           .........                     ----------          $164. 91------------
                                                                                    ...--------------------------
Total expended-.....---                           ---------------------                         164. 91 ------------      39, 775.39
Allotted---------------------------------------                                 $12, 000   -11, 835. 09     $90,000        9, 500. 00


Balance unexpended July 1, 1936----------------------------$90, 000. 00
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936--------------------------------------    9, 500. 00

      Amount to be accounted for ____ ____________----------                                                           99, 500. 00
Gross amount expended------------------------- $39, 802.56
Less reimbursements collected -----                 -____________
                                                              27. 17
                                                                                                                       39, 775. 39

      Balance unexpended June 30, 1937__------------- -- _                                                             59, 724. 61
Outstanding liabilities June 30, 1937-----------_ _    3, 839. 33
Amount covered by uncompleted contracts-----------55, 885. 28
                                                                                                                       59, 724.61

Amount (estimated) required' to be appropriated for completion of
existing project 1 -_______
                      -
                             _______ _______                                                                           10, 000. 00
    1 Exclusive of available funds.

                                             24. HOMOSASSA RIVER, FLA.

  Location.- This river has its source in several large springs near
Homosassa, Fla., flows westward 8 miles, and enters the Gulf of
Mexico 85 miles north of the entrance to Tampa Bay. (See U. S.
Coast and Geodetic Survey Chart No. 179.)
           RIVERS AND HARBORS-JACKSONVILLE,                                    FLA., DISTRICT                  635
    Existing project.-This provides for dredging a channel 40 feet
wide and 5 feet deep at mean low water through the four bars at
the entrance to the river. The mean range of tide at the entrance is
about 1/2 feet. The extreme range is about 3              feet. Strong
southwesterly winds raise the water level about 1 foot. Strong
northerly winds, which occur mostly during the winter, lower the
water level about 1 to 2 feet.
    The estimate of cost of new work, made in 1935, was $5,000, of
which amount $1,000 was contributed by local interests. The latest
 (1.935) approved estimate of cost for annual maintenance is $500.
The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 30, 74th
Cong., 1st sess.). The latest published map is in the project
document.
    Local cooperation.--Fully complied with.
    Terminal facilities.-These consist of five fish houses located along
the Homosassa River in the vicinity of Old Homosassa. There are
also a number of small privately owned docks along the river. The
facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year.-Under a contract for
dredging to provide a channel 40 feet wide and 5 feet deep through
three bars at the entrance, aggregating 1,820 feet in length, work was
commenced September 21 and completed September 26, 1936. There
were removed 8,746 cubic yards of material. The cost and expendi-
tures were $3,998.64 regular United States funds and $1,000 con,
tributed funds, a total of $4,998.64, all for new work.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1936. The controlling depth at mean low water, in Sep-
tember 1936, was 5 feet for a width of 40 feet. The costs and expen-
ditures have been $3,998.64 regular United States funds and $1,000
contributed funds, a total of $4,998.64, all for new work.
    Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
    No funds can be profitably expended during the fiscal year 1939
as the condition of the project is expected to meet the needs of com-
merce during the next 2 years.
                                         Cost and financial summary
Cost of new work to June 30, 1937---------$-------------                                                  3, 998. 64
Cost of maintenance to June 30, 1937_                                                                               _
      Total cost of permanent work to June 30, 1937--------------                                         3, 998. 64
Net total expenditures------     ------------------------------                                       1   3, 998. 64
Total amount appropriated to June 30, 1937--------------------                                            3, 998.64

         Fiscal year ending June 30                    1933       1934        1935             1936          1937


Cost of new work--.....--------........--------------------- ----------------                       1 $3,998. 64
Cost of maintenance--....-------------------- ------------ ------------ ------------ ------------ ---------
Total expended-     -------------------------------                  -..-            -------               13,998.64
Allotted-----     ---------           ------                        -------
                                                      --- ------------                                       3, 998. 64


    In addition, $1,000 was expended from contributed funds.
 636      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936------------------------------------          $4, 000. 00
Deductions on account of revocation of allotment-----------------       1. 36

       Net amount to be accounted for-------------------------       3, 998. 64
Gross amount expended--------------------------- $4,499.04
Less reimbursements collected-------------------------   500. 40
                                                                     3, 998. 64
                     25. STEINHATCHEE RIVER, FLA.

    Location.-This river rises in Lafayette County, Fla., and flows
southwesterly about 34 miles to empty into Deadmans Bay, an arm
of the Gulf of Mexico, about 32 miles north of the mouth of the
  Suwannee River. (See U. S. Coast and Geodetic Survey Chart
No. 180.)
    Existing project.-This provides for dredging a channel 6 feet
deep at mean low water from the Gulf of Mexico into and up the
river to the village locally known as Steinhatchee, about 1.5 miles
above the mouth, with widths of 150 feet in Deadmans Bay and 100
feet in the river. The length of the section included in the project
is about 33/4 miles. The mean range of tide at the entrance is about
2.4 feet, the spring range 3.1 feet. Strong northerly or northeasterly
winds may lower the water level as much as 11/2 to 2 feet.
    The estimate of cost for new work, made in 1936, is $68,300, with
maintenance estimated at $3,000 annually. The existing project
was adopted by the River and Harbor Act of August 26, 1937 (Rivers
and Harbors Committee Doc. No. 87, 74th Cong., 2d sess.). The
latest published map is in the project document.
    Local cooperation.-The act adopting the project imposed the con-
dition that local interests provide, free of cost to the United States,
any lands which may be necessary and furnish suitable spoil-disposal
areas for new work and subsequent maintenance.
    Terminal facilities.-These consist of a substantial timber marginal
wharf 250 feet long for the use of sponge boats, and three small pri-
vately owned timber docks, with one of which a small marine rail-
way is connected. The facilities are adequate for the needs of the
present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done and no
costs or expenditures have been incurred. The entrance to the river
is over a long, flat sand-and-shell bar, over which a maximum depth
of about 21/2 feet at mean low water is found. The controlling depth
in the river itself is about 4 feet at mean low water, and occurs at
each of two rock shoals which cross the river below Steinhatchee.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $68,300 can be profitably expended during the fiscal
year 1939 to be applied to new-work dredging, by contract, during
the period October 1938-April 1939, as required to provide a 6-foot
channel from Deadmans Bay to the village of Steinhatchee.
        RIVERS AND HARBORS-JACKSONVILLE,              FLA., DISTRICT        637
                         Cost and financial summary

Cost of new work to June 30, 1937------        ---------------------     -------
Cost of maintenance to June 30, 1937-----        --------------------    -------

      Net total expenditures--------      -------------------------      -------

Total amount appropriated to June 30, 1937--------------------        -------
Amount (estimated) required to be appropriated for completion of
existing project--------------------------------------------$68,          300
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work---------------------------------------             68, 300

26. REMOVING THE WATER HYACINTH FROM NAVIGABLE                          WATERS
                 IN THE STATE OF FLORIDA

   Location.-The water hyacinth is found in the fresh-water streams
and lakes in various parts of the district.
   Existing project.-The existing project provides for the destruc-
tion or removal of the water hyacinth in the navigable waters of
the State so far as they constitute an obstruction to commerce, using
any mechanical, chemical, or other means not injurious to cattle.
The use of log booms to close sloughs and backwaters as an aux-
iliary means was contemplated. No estimate of the final cost of
the work has been made. The latest (1936) approved estimate of
annual cost of maintenance is $9,500.
   The existing project was adopted by the River and Harbor Act of
March 3, 1899 (H. Doc. No. 91, 55th Cong., 3d sess.), and modified
by the River and Harbor Act of June 13, 1902, to authorize the
exterminating and removing of water hyacinth from navigable waters
by any mechanical, chemical, or other means whatsoever. The proj-
ect was again modified by the River and Harbor Act of March 3,
1905, which prohibited the use of any chemical process injurious to
cattle which might feed upon the plant.
   Operations and results during fiscal year.-Hyacinth jams ob-
structing navigation were broken up and drifted by hired labor
throughout the year as follows: Withlacoochee River between the
Florida Power Corporation's dam and Croom, 72 miles, 1,659,345
square yards; upper St. Johns River and tributaries, 4,333,562
square yards; Arbuckle Creek, 1,115,593 square yards; and Lake
Okeechobee, 222,600 square yards. The total for the year was
7,331,100 square yards, at a cost of $11,868.35 for maintenance. The
expenditures were $10,887.98.
   Condition at end of fiscal year.-A reasonably clear channel is
being maintained in the Withlacoochee River as far upstream as
Croom, 85 miles above the mouth. Above Croom the river and tribu-
tary creeks and sloughs are blocked by the hyacinth growth. The
channel of the upper St. Johns River and its principal tributary
streams are being kept reasonably clear of the water hyacinth. The
Kissimmee River is open to navigation, and Arbuckle Creek, a
tributary of the Kissimmee River between Lake Arbuckle and Lake
Istokpoga, was reasonably clear of the growth. The hyacinth situ-
ation at the close of the fiscal year in other waterways had not
become troublesome. The total cost has been $289,100.02 for main-
tenance, and the total expenditures have been $288,066.12.
638         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-The balance unexpended and accounts re-
ceivable July 1, 1937, together with an allotment of $7,000 made
during July 1937, a total of $11,216.24, will be applied to main-
tenance involved in the removal by hired labor of the water hya-
cinth in the St. Johns, Kissimmee, and Caloosahatchee River sys-
tems, and in other navigable waterways in the district where such
work may become necessary.
  The sum of $10,000 can be profitably expended during the fiscal
year 1939, for the removal of water hyacinth by hired labor, as
necessary, from the various navigable waterways in the district.
                                 Cost and financial summary
Cost of new work to June 30, 1937                                                              -------
Cost of maintenance to June 30, 1937___---------------------                                   $289,100.02

      Total cost of permanent work to June 30, 1937------------289, 100. 02
Plus accounts receivable June 30, 1937-----------    ---------      175. 62

      Gross total costs to June 30, 1937___------------- -------                                289, 275. 64
Minus accounts payable June 30, 1937------------------------                                      1, 209. 52

      Net total expenditures----------------------------                                       288, 066. 12
Unexpended balance June 30, 1937 -----------------------------                                   4, 040. 62

         Total amount appropriated to June 30, 1937-------------                                292, 106.74

        Fiscal year ending June 30              1933         1934         1935          1936            1937


Cost of new work..----------     --------------------------------------------------------
Cost of maintenance-._------------------  $3, 244. 22 $8, 940. 00 $7, 951. 47 $8, 750. 86 $11, 868. 35
Total expended-.....----------------------     2, 839. 43   9, 348. 60   7, 969. 30    8, 707.43       10,887.98
Allotted-- ......--------------------------   13, 795. 74   6, 311. 00   7, 000. 00   13, 000. 00       3, 500. 00


Balance unexpended July 1, 1936---------------------------                                      $11, 428. 60
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-------------------------------------                                            3,500. 00
      Amount to be accounted for-.__                                                                14, 928. 60
Gross amount expended-------------------------                              $11, 579. 75
Less reimbursements collected----------------------                              691. 77
                                                                                                    10, 887. 98
      Balance unexpended June 30, 1937-----------------------                                        4, 040. 62
Outstanding liabilities June 30, 1937---------------------------                                     1, 209. 52
     Balance available June 30, 1937_________________________                                        2, 831. 10
Accounts receivable June 30, 1937------------------------------                                         175. 62
     Unobligated balance available June 30, 1937 ---    -                                            3, 006. 72
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_ _____________-_____                                                         7, 000.00
     Balance available for fiscal year 1938_        __                                              10, 006. 72
Amount that can be profitably expended in fiscal year ending
                                 f     _
June 30, 1939, for maintenance      _   --    -------                                              10, OO. 00
   1 Exclusive of available funds.

    27. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year was $98,779.24; the expenditures
were $114,475.32. The balance unexpended June 30, 1937, together
           RIVERS AND IHARBORS-JACKSONVILLE, -FLA., ]DISTRICT                                                      639

with accounts receivable and allotment of $30,000 made during July
1937, a total of $49,897.29, will be applied as needed during the fiscal
year 1938 to expenses incurred under this heading. The additional
sum of $120,000 can be profitably expended during the fiscal year
1939.
                                         Cost and financial summary

Cost of new work to June 30, 1937--------------------------------------
Cost of maintenance to June 30, 1937------------------------  $1, 076, 372. 86

      Total cost of permanent work to June 30, 1937-----------                                         1, 076, 372. 86
Undistributed costs June 30, 1.937 --------------------------                                              26. 635. 85

      Net total cost to June 30, 1937                                       _______________            , 103, 008. 71
                                                                                                      1______
Plus accounts receivable June 30, 1937                                                                         73. 46

      Gross total costs to June 30, 1937 _                                                            1, 103, 082. 17
Minus accounts payable June 30, 1937-----------------                                                      8,615.85

     Net total expenditures______________________     ___                                             1,094, 466. 32
Unexpended balance June 30, 1937----    _____-_____________                                               91,823. 83
         Total amount appropriated to June 30, 1937------------                                       1, 114, 290. 15

   Fiscal year ending June 30                1933              1934            1935           1936             1937


Cost of new work....------------- .------        -----    -------------- ... .. . .. ..... . .. . .. ... .. . .. .
                                                                           ------------..
Cost of maintenance------------           $213, 861. 38      $206, 337. 21  $113, 918. 46 $184, 590. 18 $98, 779. 24
Total expended    ....----------------     210, 320. 31      209; 529. 11    111, 131. 18   190, 994. 51      114, 475. 32
Allotted-------------------------          264, 772. 18      189, 867. 97     81, 000. 00   219, 000. 00      74, 000. 00


Balance unexpended July 1, 1936_--_--_--     --- -------               $60, 299.15
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_ .-- __----------       $20, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936-__-     ---        ___-_-54, 000. 00
                                                                                                           74, 000. 00

      Amount to be accounted for _______        ___----__ -------     134,299. 15
Gross amount expended-----------------------------       144, 190. 18
Less:
    Reimbursements collected- --------- $29, 678. 36
    Receipts from sales --------               36. 50
                                                          29, 714. 86
                                                                      114, 475. 32
      Balance unexpended June 30, 1937..--...- -------------                                               19,823.83
Outstanding liabilities June 30, 1937_-------__---------____ __                                             8, 615. 85
      Balance available June 30, 1937-------------- ------------                                           11,207. 98
Accounts receivable June 30, 1937-----------------------------                                              - 73. 46
     Unobligated balance available June 30, 1937_-----------    - 11, 281.44
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937 ----------------------------------------    30, 000. 00
        Balance available for fiscal year 1938---------------------                                        41, 281. 44
Amount that can be profitably' - -expended
                                   - - - - --
                                              in -fiscal
                                                     -
                                                         year
                                                          -   ending
                                                                -    -June
30, 1939, for maintenance                                                 120,000. 00
xExclusive of available funds,.
     20196---37-pt. 1----41
640             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1987

28. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                        [Commercial statistics for these projects are given in pt. 2 of report]

                                                                             For       Cost and expenditures to
                                                                             last            June 30, 1937                        Esti-
                                                                           full re-                                              mated
                          Name of project                                    port                                  amount
                                                                           see An-                                 required
                                                                             nual
                                                                           Report      New work                        om-
                                                                                                       Maintenance toplete
                                                                              for

1. St. Johns River, Fla., Jacksonville to Palatka 1.....- - -1933                      $205, 698. 47      $116, 328.46            $13, 300
2. Lake Crescent and Dunns Creek, Fla. 1 ----                   1931                     10, 276.25             5, 723.75          53, 800
3. St. Lucie Inlet 13_            _____----------__          _1932                       26, 688. 51   ......------------...    1,410, 000
4. Miami River, Fla..----...------------------------------                  1935        646, 915. 17         3, 000. 00               (4)
5. Kissimmee River, Fla.   - - - - - - - - -.................
                     - - - 1----..........-----------------------
                                               - - - - - - - ------ ----    1931         23, 479. 18        25, 202. 14               (4)
6. Crystal River, Fla.            ........                                  1919          25, 000.00          9,000.00                (4)
7. Withlacoochee River, Fla.------------_-----------                        1934        315, 085. 29        49, 570. 23           100, 000
8. Cedar Keys Harbor, Fla.l-----------------------------                    1932        147, 020. 98        30, 000.00              3, 500
9. Suwannee River, Fla.'...-----------.......--------------..........       1931         76, 417.96         32, 394.06            200, 000

  1 Channels adequate for commerce.
  SLocal cooperation required.
  $ Abandonment recommended Sept. 18, 1917, in H. Doc. No. 370, 65th Cong., 1st sess., also under date of
Jan. 16, 1933.
  ' Completed.

         29. PLANT ALLOTMENT FOR JACKSONVILLE, FLA., DISTRICT
                                           Cost and financial summary
Undistributed costs June 30, 1937__---------------------     -                                                       $996, 422. 57
Plus accounts receivable June 30, 1937______________-_________                                                         94, 453. 72

     Gross total costs to June 30, 1937-----------                                            _______-1, 090, 876. 29
Minus accounts payable June 30, 1937-------------------------                                                            41, 826. 62
     Net total expenditures                           __     1______________________
                                                             1, 049, 049. 67
Unexpended balance June 30, 1937----------------------------     22, 097.92
           Total amount appropriated to June 30, 1937------------                                                 1,071,147.59

Fiscal year ending June 30              1933              1934                1935                1936                        1937


Total expended------------                      .--------------
                                                              --           $2,330, 105. 58     -$257, 109. 02         -$1, 023, 946. 89
Allotted-......-------------- ------------.------------                     2, 547, 832. 78     -420, 873. 05           -1, 055, 812. 14


Balance unexpended July 1, 1936---------------------------                                                           $53, 963. 17
Deductions on account of revocation of allotment------------                                                      1, 055, 812. 14
      Net amount to be accounted for____            _____-       ____ -- 1, 001, 848.97
Gross amount expended ----
                        _-------________               $1, 346, 520.22
Less:
    Reimbursements collected_-_ $1, 597, 488. 83
    Receipts from sales----------        772, 978. 28
                                                         2, 370, 467. 11
                                                                         -1, 023, 946. 89
Balance unexpended June 30, 1937__________---------------_                                                               22, 097. 92
Outstanding liabilities June 30, 1937-----------   $41, 826. 62
Aindunt covered by uncompleted contracts ....        28, 777. 33
                                                                                                                         70, 603. 95.
     SBalance available June 30, 1937-.......
                                          -   _._- _                                                                -48, 506. 03
Accounts receivable June 30, 1937---------_____-     _                                                                94,453. 72
          Unobligated balance available June 30, 1937--                                                                 45, 947. 69
             RIVERS AND HARBORS-JACKSONVILLE,                                                                     FLA., DISTRICT                 641
Status of reports called for by river and harbor acts and committee resolutions'

                                                                     Date trans-                                                       Recommenda-
         Locality                  Authorization act                  mitted to                              Document no.                  tion
                                                                      Congress

Alafla River, Fla-........Senate committee reso- --------------- ------------------------
                             lution, Apr. 19, 1934.
Anclote River, Fla-...... River and Harbor Act, ---------------                                       ------------------------

                             Aug. 26, 1937.
Anclote River, Fla., to ---..... do....------------- ---------------                                  ------------------------

  Safety Harbor on Old
  Tampa Bay, water-
  way via Lake Butler.
Apalachicola Bay to the        River and Harbor Act,               July             8,1937                House, 291, 75th Cong.,
  Withlacoochee River,          Aug. 30, 1935.                                                             1st sess.
  Fla., Intracoastal
  Waterway from.
Banana River to Mos-           ...----do--------------...--...     Nov.             7, 1936 I--------------------.............         Unfavorable.
  quito Lagoon, Merritt
  Island, Fla., water-
  way.
Blind Pass, Fla., beach-       River and Harbor Act,               Mar. 25, 1937                          House, 187, 75th Cong.,          Do.
  erosion study.                July 3, 1930.                                                              1st sess.
Broward County,Florida,        Flood Control Act,
  Intracoastal     Water-       June 26, 1936.
  way throughout (pre-
  liminary examination
  for flood control).
Caloosahatchee River,          Senate committee reso-              Nov. 17,1936                                                            Do.
  and Lake Okeechobee            lution, July 23, 1934.
  drainage areas, Florida,
  extension of levees.
Caloosahatchee River            Rivers and Harbors                 May 12, 1937                           Rivers and Harbors           Favorable..
  and Lake Okeechobee             Committee      resolu-                                                   Committee, 28, 75th
  drainage areas, Florida,       tion, Apr. 20, 1937.                                                       Cong., 1st sess.
  reconstruction of locks
  and weirs in St. Lucie
  Canal.
Caloosahatchee River,           Rivers and Harbors
  Fla., from Fort Myers          Committee      resolu-
  to Gulf of Mexico.              tion Apr. 30, 1935.
Caloosahatchee River to         River and Harbor Act,
  the Withlacoochee              Aug. 30, 1935.
  River, Fla., Intra-
  coastal Waterway
  from.
Caloosahatchee       River      River and Harbor
  and Lake Okeechobee            Act, Aug. 26, 1937.
  drainage areas, Flor-
  ida, levees between
  Kissimmee River and
  Fisheating Creek.
Canaveral Harbor, Fla--       ....--
                                  do-...-.     .---------
Charlotte Harbor and           River   and Harbor
  Peace River from               Act, Aug. 30, 1935.
  Punta Gorda to Cleve-
  land, Fla., deepening
  of channel.
Clearwater Harbor, Fla,             Rivers and Harbors
  including Big Pass                  Committee resolu-
  and Little Pass.                    tion, Aug. 11, 1937.
    Do..-- ------                   Senate committee res-          May 27, 1937                       _____.............------------   Unfavorablb.
                                      olution,   May 8,
                                      1935.
   Do.............----------------- River    and Harbor             do--......----...---------------...............
                                                                 ....                            Do..
                                      Act, Aug. 30, 1935.
Courtenay, Fla., connec- - --- do-------------..........         ......................................
tion with Intracoastal
Waterway.
Crescent Lake, Fla., to        River and Harbor I .............
Flagler Beach, Fla.,           Act, Aug. 26, 1937.
waterway via Haw
Creek to Bunnell.
Daytona Beach, Fla-.....       River and Harbor                    Feb. 26,1937                                                           Do..
                                Act. Aug. 30, 1935.
Eau Gallie, Fla., con- ..--...
                            do................
  nection with Intra-
  coastal Waterway.
    Do .-------..      ---- do    ...------ --- Nov. 20, 1936                                         -----------------------             Do..
Fenholloway River, Fla_ River and Harbor ..............                                               ------------------------
                                 Act, Aug. 26, 1937.
Hillsboro River, Fla.,                               ---...........- ----------------
                                  do------------..............
                               -....---                                             ,-------
  from' upper end of
existing project to Sul-
phur Springs, Fla.
DeLeon Springs to St.          River and Harbor                   Nov. 18,1936 .....---                           -----------             Do.
Johns River, Fla., wa-         Act, Aug. 30, 1935.
terway.
 642           IREPORT         OF CHIEF OF ENGINEERS, U. S. ARMY,                                          1937

     Status of reports called for by river and harbor acts and committee
                                            resolutions-Continued

                                                              Date trans-
          Locality               Authorization act             mitted to                   Document no.        Recommenda
                                                               Congress                                            tion

  Hollywood Beach, Fla., River and Harbor Act,               May 18, 1937        House, 253, 75th Cong., Favorable.
     beach erosion.             July 3, 1930.                                       1stsess.
       Do---- --------- _ -_ Act of Congress, June          ..... do---------   ---.....do---------------   Do.
                                26, 1936.
  Hudson Creek, Pasco River and Harbor Act,                                     .. ....d ............ .. ...
     County, Fla.               Aug. 26, 1937.
Indian River, Indian ...----- do....-----------
     River (Vero Beach) St.
    Johns River water-
    way, Fla.
.Jacksonville to Key River and Harbor Act,                   Mar. 23, 1937        House,    180,    75th          Do.
     West, to a point at or     Aug. 30, 1935.                                     Cong., lst sess.
    near Jacksonville
    Beach, Fla., waterway.
.Jupiter Inlet, Fla_-__...   --. do_-...              - -   Nov. 19, 1936       ......................--       Unfavorable.
  Lake Worth Inlet, Fla__- Rivers and Harbors               ---------------
                                Committee resolu-
                                tion, Apr. 20, 1937.                            ..----------------------


  Lemon Bay to Gulf of River and Harbor Act,                Mar. 18, 1937                                         Do.
    Mexico, waterway.           Aug. 30, 1935.
  Miami Beach, Fla., cur- River and Harbor Act,             Mar. 9,1937          House, 169, 75th Cong.,       Favorable.
    rent and sand move-         July 3, 1930.                                     1st sess.
    ment studies.
  Miami Beach, Fla., River and Harbor Act,                   ..............
    turning basin at east       Aug. 30, 1935.
    end of Municipal
     Channel.
  Miami Harbor, Fla --- .....--   do------.... ........
  Miami Harbor, Fla., Senate committee res-
    turning basin and con-      olution, Apr. 19,
    necting channel at          1934.
    causeway terminal,
    Miami Beach.
  Miami Harbor, Fla., Rivers and Harbors                                        ------------------------
    modify existing proj-       Committee resolu-
    ect.                        tion Mar. 24, 1937.
  Miami to Key West, Senate committee res-                                      ------------------------

     Fla., waterway.            olution, Oct. 22,
                                1936.
  Naples Bay through River and Harbor Act,                                      ------------------------

     Gordons Pass, Dollar       Aug. 30, 1935.
     Bay, Big Marco Pass,
     Little Marco Pass into
     Rookery Bay, chan-
     nel.
  New River, Fla ........ Rivers and Harbors                                    ------------------------

                                Committee resolu-
                                tion, Apr. 29, 1937.
  New River Inlet and River and Harbor Act,                  Dec. 28,1936       ------------------------       Unfavorable.
     Sound, Fla.                Aug. 30, 1935.
  North New River Canal, Rivers and Harbors                                     ------------------------
     Fla.                       Committee resolu-
                                tion, Feb. 13, 1935.
  Oklawaha River, Fla., Rivers and Harbors                                      ------------------------

     from headwaters of,         Committee resolu-
     and Lake Griffin to        tion, Aug. 12, 1933.
     Lake Tohopekaliga
    and other lakes con-
    necting Oklawaha
     River system and
     Kissimmee River sys-
     tem.                                                   Dec. 28, 1936
  Oklawaha River, Fla., River and Harbor Act,                                   ------------------------
                                                                                                                  Do.
     to Leesburg and chan-        Aug. 30, 1935.
     nel into Lake Harris.
  Palm Beach, Fla., side ----- do-.....------                                   ------------------------
     channel or basin to
     connect with Intra-
     coastal Waterway.
   Pirates Cove. Channel Senate committee res-
     in Sacarma Bay, Pi-        olution, May 27,
    rates Cove, and John-       1936.
    sons Pass, Fla.
  Pithlachascotee River, River and Harbor Act,                                  ------------------------
     Fla.                       Aug. 26, 1937.
  Ponce de Leon Inlet, Rivers and Harbors                    Dec. 23,1936       ------------------------          Do.
     Fla.                        Committee resolu-
                                tion, Feb. 27, 1935.
 .Port  Everglades, Fla.... Rivers and Harbors              -- -- -- -- --      ------------------------
                                 Committee resolu-
                                tion, Apr. 29, 1937.
           RIVERS AND HARBORS-JACKSONVILLE,                                                           FLA., DISTRICT       643
        Status of reports called for by river and harbor acts and committee
                                       resolutions-Continued

                                                        Date trans-                                             Recommenda-
        Locality              Authorization act           mitted to                          Document no.           tion
                                                          Congress

Punta Rasa, Fla., to        River and Harbor Act,
Stuart, Fla., Waterway      Aug. 26, 1937.
v i a Caloosahatchee
  River and Canal, Lake
  Okeechobee, and St.
  Lucie    Canal and
  River
St. Augustine Harbor,       Rivers and Harbors                                      ----- -- - -- -- - -- -
  Fla.                       Committee resolu-
                             tion, Mar. 20, 1936.
St. Johns River, Fla-....   Rivers and Harbors        Apr.            1, 1937       ---- ---- --- - ---- ---    Unfavorabe
                             Committee resolu-
                             tion, Feb. 11, 1936.
St. Johns River to ICis-    River and Harbor      -- - - - - - - --- -- --- -- --- -- --
  simmee River, Fla.,        Act, Aug. 30, 1935.
  thence to Okeechobee
  Cross-Florida Canal
  Channel, waterway.
St. Johns River .at or ...---.. do------------   I-----------------------------...............
near Sanford, Fla., to
  Tampa, Fla., via Kis-
  simmee and Alafiala
  Rivers and Tampa
  Bay, waterway.
St. Johns River, Fla., Senate committee res-
  Jacksonville to Palat-
  ka.
                            olution, Mar. 20,
                            1926.                    ---------- ---- --------------
                                                                                  "-'
St. Johns River to Rivers and Harbors
  Indian River, channel      Committee resolu-
                                                     ----------------------- ---------
  from Sanford to Titus-    tion, Jan. 27, 1937.
  ville.
St. Johns River, Fla., Rivers and Harbors
  Jacksonville to the        Committee resolu-
  ocean.                    tion, June 9, 1937.
St. Lucie Inlet, Fla ... River        and Harbor   Jan. 11, 1937                                                   Do.
                              Act, Aug. 30, 1935.
St. Lucie, West Palm .....do .--------------
  Beach,     Hillsboro,
  North New River,
and Miami Canals,
  Fla.
Sarasota Bay, Fla_ ___ Rivers and Harbors              Aug. 12, 1936                 House, 80, 75th Cong.,     Favorable.
                             Committee resolu-                                        1st sess.
                             tion, June 13, 1934.
Sarasota Bay, Fla -__-     River and Harbor            Aug. 12,1936                  House, 80, 75th Cong.,        Do.
                             Act, Aug. 30, 1935.                                      1st sess.
Sarasota (Little) Bay, Rivers and Harbors                                           ........................
  Fla., between Sarasota     Committee resolu-
  and Venice.                tion, May 18. 1934.
Sebastian, Fla., to Intra- River and Harbor
  coastal Waterway,          Act, Aug. 26, 1937.                                    ........................
  channel.
Sebastian Inlet, Fla.....   Rivers and Harbors
                              Committee resolu-
                              tion, Apr. 20, 1937.     ...............
Suwannee River, Fla.,       Flood Control Act,        . .     .. . .     ..   . .
from Florida-Georgia         Apr. 10, 1936.                                        ........................
line to Gulf of Mexico
  (preliminary examina-
  tion for flood control).
Suwannee River, Fla___ Rivers and Harbors                                           ........................
                              Committee resolu-
                              tion, Mar. 16, 1937.
Tampa and Hillsboro         Senate committee res-
  Bays, Fla.                  olution, Dec. 23,
                              1935.
Tampa and Hillsboro         Senate committee res-
  Bays, Fla., improve-        olution, Aug. 23,
  ment of Sparkman,           1935.
  Ybor, and Garrison
  Channels.
Tampa       Bay,   Fla., River and Harbor Apr. 14, 1937 ---....................---------- I Unfavorable.
  mouth to Fort Pierce    Act, Aug. 30, 1935.
  Harbor, via Manatee
  River, waterway.
Vero Beach, Fla., to In- River and Harbor
  tracoastal Waterway,    Act, Aug. 26, 1937.            ----------------------
  channel from.
Weekiwachee River, ..... do-------------------I....
  Fla.
(44       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
            MOBILE, ALA., DISTRICT
  This district includes the western portion of the State of Georgia,
the northwestern portion of the State of Florida, the State of Ala-
bama, except the extreme northern portion, the eastern portion of the
State of Mississippi, and a small portion of the States of Louisiana
and Tennessee. It includes, specifically, the harbors on the coast of
Mississippi and Alabama, the harbors in the northwestern portion
of Florida, and all rivers flowing into the Gulf of Mexico west of
and including Aucilla River, in Florida, to and including the Pearl
River, La. and Miss.
  District engineer: Col. R. Park, Corps of Engineers.
  Division engineer: Col. F. B. Wilby, Corps of Engineers.
                                       IMPROVEMENTS

                                        Page                                   Page
1. St. Marks River, Fla- ....           645 19. Blackwater River, Fla.....     676
2. Carrabelle Bar and Harbor,               20. Mobile Harbor, Ala_ ....       677
      F la -- - - - -- - - - -           646 21. Removing the water hya-
3. Apalachicola Bay, Fla _..            647       cinths (Mobile River, Ala.,
4. Apalachicola River, Fla., the                  tributaries)              - -680
       cut-off, Lee Slough, and              22. Chickasaw Creek, Ala .....    .682
       Lower Chipola River ....          649 23. Alabama River, Ala, ......     684
  5. Upper Chipola River, Fla.,              24. Coosa River, Ga. and Ala ,- 686
      from Marianna to its                   25. Black Warrior, Warrior, and
       mouth                             651       Tombigbee Rivers, Ala_ _     690
                                             26. Tombigbee River from De-
 (6. Chattahoochee River, Ga.                      mopolis, Ala., to Walkers
      and Ala--------------              653       Bridge, Miss_                699
7. Chattahoochee River, Ga.                 27. Bayou Labatre, Ala ,...        700
       (flood control)      __           655 28. Pascagoula Harbor, Miss. -     701
8. Intracoastal Waterway, Ap-               29. Pascagoula River, Miss..-      703
       alachicola Bay to St.                 30. Biloxi Harbor, Miss .......    704
       Marks River, Fla .......          656 31. Gulfport Harbor and Ship
  9. Channel from Apalachicola                     Island Pass, Miss .......    706
       River to St. Andrews Bay,             32. Wolf and Jordan Rivers,
       Fla-----------------              657        Miss                        708
10. Waterway from Choctaw-                   33. Examinations, surveys, and
       hatchee Bay to West                         contingencies (general)---   710
       Bay, Fla-------............       660 34. Other projects for which no
11. Intracoastal Waterway from                     estimates are submitted_     711
      Choctawhatchee Bay to                  35. Plant allotment                711
       Pensacola Bay, Fla. (Santa
       Rosa Sound)     .           .     662          FLOOD CONTROL PROJECTS
12. Intracoastal Waterway from
       Pensacola Bay, Fla., to               36. Escambia River Basin, Es-
       Mobile Bay, Ala ___....           663       cambia River at Flomaton,
13. Intracoastal Waterway from                     Ala_.--.............                   712
       Mobile Bay, Ala., to New              37. Escambia           River     Basin-
       Orleans, La___                    665       Conecuh River at Brew-
14. Entrance to St. Josephs Bay,                   ton, Ala___.________                   712
      Fla -- - - - - - - =        -      666 38. Coosa River at Rome, Ga __               713
15. St. Andrews Bay, Fla ....            668 39. Tombigbee River at Fulton,
16. LaGrange Bayou, Fla_                 671       Miss-            __-----------------   713
17. East Pass Channel from the               40. Pearl River Basin-Pearl
       Gulf of Mexico into Choc-                   River, Miss. and La., at
       tawhatchee Bay, Fla ....          672       Jackson, Miss-________-_               714
18. Pensacola Harbor, Fla- ....          673 41. Collinsville, Ala_____._....             714
          RIVERS AND HARBORS-MOBILE, ALA., DISTRICT               645
                      1. ST. MARKS RIVER, FLA.

    Location.-The St. Marks River rises about 14 miles southeast of
Tallahassee, Fla., and flows in a southerly direction into the Gulf
of Mexico 108 miles east from the entrance to St. Andrews Bay.
The entire length of St. Marks River is 17 miles. (See U. S. Coast
and Geodetic Survey Chart No. 182.)
    Previous projects.-The sum of $36,010.86 represents the cost and
expenditures between 1828 and 1844, but apparently under no def-
inite project. The division of this amount as between new work
and maintenance is not known.
    Existing project.-This provides for a channel 10 feet deep and
  100 feet wide at mean low water on suitable alinement and with
greater width where necessary at bends, from the 10-foot contour
in Apalachee Bay to the town of St. Marks, with a turning basin
of the same depth and 200 feet square at the latter point, and for
the removal of snags and similar obstructions from the present chan-
nel between St. Marks and Newport. The average tidal range is
between 3 and 4 feet.
    The estimated cost of new work, exclusive of amounts expended on
previous projects, revised in 1937, is $86,000. The latest (1937)
approved estimate of cost for annual maintenance is $1,500.
    The existing project was authorized by the following river and
harbor acts: The act of July 3, 1930 (H. Doc. No. 453, 70th Cong.,
2d sess.), provided for a channel 10 feet deep and a bottom width
of 100 feet at mean low water between the mouth of the river and
St. Marks, a distance of 6 miles, to be obtained by dredging; the
act of August 26, 1937, provided for the present project dimensions,
straightening and widening the channel where necessary and re-
moval of snags and obstructions (River and Harbor Committee
Doc. No. 77, 74th Cong., 2d sess.). The latest published map is
contained in the latter document.
    Local cooperation.-The act of August 26, 1937, requires that local
interests shall furnish free of cost to the United States necessary
rights-of-way and suitable spoil-disposal areas for new work and
subsequent maintenance.
    Terminal facilities.-The terminal facilities on this stream con-
sist of small wooden wharves and docks at the towns of St. Marks
and Newport. These wharves and docks are used for transferring
fish from small fishing craft to cold storage, for unloading petroleum
products, for refueling fishing and pleasure craft, and as berths for
the small boats located there. They are owned by local residents and
by petroleum companies. None are publicly owned, but a privately
owned dock with 200 feet of frontage at St. Marks is free and open
to the public. There are small marine ways at both St. Marks and
Newport.      The facilities are considered adequate for present
commerce.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project prior to modification
by the act of August 26, 1937, was completed in 1931. No work has
been done under the modified project. The controlling depth, ascer-
tained in June 1937, was 10 feet. The total cost and expenditures
under the existing project, all new work, to June 30, 1937, was
$11,000.
646          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-No funds are available, and no operations
are contemplated during the fiscal year 1938.
   The sum of $75,000 can be profitably expended during the fiscal
year 1939 for new work as follows:
Dredging, by contract, to project dimensions, the channel from the 10-
  foot contour in Apalachee Bay to St. Marks and the turning basin
  at St. Marks, about 5 months, July 1 to Nov. 20, 1938 ________-- __- $73, 500
Removing snags and obstructions from the channel between St. Marks
  and Newport, about 1 month, July 1938, with United States plant__      1, 500

      Total--------------------- -----------------------                      75,000

                                    Cost and financial summary

Cost of new work to June 30, 1937___1111111                      $47, 010.86
Cost of maintenance to June 30, 1.937------------------------------------
      Total cost of permanent work to June 30, 1937 _________---_         47, 010. 86
Net total expenditures----------------------------------------            47, 010. 86
Total amount appropriated to June 30, 1937-------- ----------             47, 010. 86

Amount (estimated) required to be appropriated for completion of
  existing    project _ __-------                     -     -----------   75, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work---------------------------------------            75, 000. 00

                   2. CARRABELLE BAR AND HARBOR, FLA.

   Location. Carrabelle Bar and Harbor are located on the coast of
northwest Florida about 185 miles east of Pensacola Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 182.)
   Previous projects.-Adopted by the act of June 3, 1896. The cost
and expenditures on this project were $21,704.08 for new work. For
further details see page 1833 of Annual Report for 1915.
   Existing project.-This provides for a channel 200 feet wide and
27 feet deep from the Gulf of Mexico to a point west of Dog Island,
thence 150 feet wide and 25 feet deep through St. George Sound
and Carrabelle River to a turning basin 500 feet square and 25 feet
deep at the town of Carrabelle.
   The estimated cost of new work, revised in 1937, is $346,000, in-
cluding $15,500 for aids to navigation. The latest (1937) approved
estimate of cost for annual maintenance is $24,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for a channel at East
Pass and the work at Dog Island (H. Doc. No. 63, 56th Cong., 1st
sess.); the act of March 2, 1907, provided for a channel 100 feet wide
with a depth of 18 feet from the outer harbor to a point about 2,500
feet outside the mouth of the river, with a turning basin, thence
10 feet deep to the wharves at Carrabelle, without any prior report
having been made thereon; the act of August 26, 1937, provided for
the present project dimensions (H. Doc. No. 184, 75th Cong., 1st
sess.). The latest published map of this locality will be found in
the latter document.
   Local cooperation.-The act of August 26, 1937, required that local
interests shall furnish, free of cost to the United. States, necessary
rights-of-way and suitable spoil-disposal areas for new work and for
subsequent maintenance and agree to construct and maintain suitable
terminal facilities open to all on equal terms.
              RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                            647
   Terminal facilities.-Boat landings built along the water front
consisting of a pile bulkhead and fill.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The opening in Dog Island has
been closed. The part of the project pertaining to the channel
across the bars at East Pass was completed in 1909; that per-
taining to the river channel was completed in 1909; that pertain-
ing to the inner harbor channel was completed in 1913. The
work required to be done to complete the project is that authorized
by the River and Harbor Act of August 26, 1937, and the turning
basin authorized in 1907. The project is 28 percent completed. On
June 30, 1937, the controlling depths were as follows: River chan-
nel 10.0 feet; inner harbor channel 14.0 feet; and East Pass entrance
channel 20.5 feet.
   The total cost and expenditures was $233,373.01, of which $96,-
026.70 was for new work and $137,346.31 for maintenance.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1938.
   The sum of $234,500 can be profitably expended during the
fiscal year 1939, for new work as follows:
Dredging by contract to provide project dimensions in the sound and
  river channels and in the turning basin, about 6 months, July 1 to
Dec. 31, 1938-------------------------------------------------      $161, 000
Dredging with a United States seagoing hopper dredge to provide
  project dimensions in the outer bar channel, about 21/2 months,
  July 1 to Sept. 15, 1938 -----------------------------------         73, 500
       Total                         --------            ---------------------                 234, 500

                                 Cost and financial summary
Cost of new work to June 30, 1937-----------------                                         $117, 730. 78
Cost of maintenance to June 30, 1937---------------------------                             137, 346. 31
      Total cost of permanent work to June 30, 1937------------                            255, 077. 09
Net total expenditures-----------------------------------------                            255,077. 09
Total amount appropriated to June 30, 1937------------------                               255, 077-09

        Fiscal year ending June 30              1933        1934         1935       1936         1937

Cost of new work       ...------------------
                                         ---------       ----------      ------ -----------   -----------
Cost of maintenance-     - .-
                        ____--_  -. ---   $10, 015. 47    _        - ----
                                                                      $12, 976.30
Total expended......................... $7,614. 62 $2,427. 55 12, 949. 60
Allotted      - --             -         10
                                        .911.55     -796.93 12, 927.55 -$50. 40.
Amount (estimated) required to be appropriated for completion of
existing project                                                 $-----------------------
                                                                   234, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work___---------------------------------------  234, 500. 00
                              3. APALACHICOLA BAY, FLA.

  Location.-This bay is situated on the coast of northwest Florida
160 miles east of Pensacola Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 183.)
  Previous projects.-Adopted in the River and Harbor Act of June
14, 1880, and modified by the River and Harbor Act of March 3, 1899.
648     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

The total cost and expenditure since 1833 was $303,379.26, of which
$134,613.50 was for new work and $168,765.76 for maintenance.
 (For further details see p. 1833, Annual Report for 1915.)
   Existing project.-This provides for channels from the Gulf of
Mexico 10 feet deep at mean low water, through West Pass, in the
Gulf of Mexico, and Link and Inner Bar Channels in Apalachicola
Bay, with a width of 150 feet in West Pass and Link Channels, and
a width of 100 feet in the Inner Bar Channel. It also provides for
a channel through bulkhead shoals 9 feet deep and 100 feet wide
which serves as another entrance to Apalachicola Bay through East
Pass, the entrance channel to Carrabelle Harbor.
   The mean range of tide throughout this harbor is 2 feet. The
extreme range, except during storms, is about 3 feet.
   The estimate of cost of new work, revised in 1927, was $82,144,
exclusive of amounts expended on previous projects. The latest
 (1927) approved estimate of annual cost of maintenance is $14,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for a channel 18
feet deep through West Pass and Link Channel, 10 feet deep across
the bar, and 9 feet through bulkhead shoals (H. Doc. No. 422, 59th
Cong., 1st sess.) ; and the act of January 21, 1927, provided for the
present dimensions of the project (H. Doc. No. 106, 69th Cong., 1st
sess.). The latest published map is in the last-mentioned document.
   Terminal facilities.-Small marginal wharves for river boats and
coastwise traffic built along the water front on piles, bulkheaded, and
filled in. They answer the purpose, and no better facilities are
required.
    Operations and results during fiscal year.-The U. S. pipeline
dredge Muscogee, operating in the River bar channel, from Novem-
ber 19, to December 22, 1936, removed 105,660 cubic yards of material.
The cost was $12,700.67 for maintenance. The expenditures were
$12,700.67.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1925. A timber bulkhead, 9,874 feet long was constructed
to protect the already completed 10-foot channel at the mouth of
Apalachicola River. The bulkhead was destroyed during 1916 by
two severe storms and has never been rebuilt. The controlling depths
on June 30, 1937, were as follows: River bar channel 9 feet, St.
Georges Channel 10 feet, Link Channel 10 feet, West Pass 10 feet,
and bulkhead shoals 9 feet. The total cost under the existing project
was $600,696.08, of which $82,144.59 was for new work and $518,-
551.49 for maintenance. The total expenditures were $600,696.08.
   Proposed operations.--No funds are available for work during the
fiscal year 1938.
   The sum of $30,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging in the restoration of project
dimensions in the river bar and bulkhead shoals channels with the
U. S. hydraulic pipe-line dredge Blackwater for a period of about
11/2 months, at a cost of about $22,000 and for maintenance dredging
for a period of about two-thirds of a month in the restoration of
project dimensions in the West Pass Channel by the operation of
a small United States seagoing hopper dredge at a cost of approxi-
mately $8,000, at such time as may be necessary to meet the needs
of navigation.
               RIVERS AND HARBORS--MOBILE, ALA., DISTRICT                                                        649
                                 Cost and financial summary

Cost of new work to June 30, 1937----------------- -------- $216, 758. 09
Cost of maintenance to June 30, 1937------------------- ----- 687, 317.25.

      Total cost of permanent work to June 30, 1937------- ---        904, 075. 34
Net total exenditures------------------------------------             904, 075. 34
Total amount appropriated to June 30, 1937                            904. 075. 34
                                                             ___------------------

        Fiscal year ending June 30               1933            1934           1935          1936            1937

Cost of new work    -------------------
Cost of maintenance.----..---------------
                                             ------------ ------------ ------------..------------
                                              $29, 345.00    $18, 214. 25   $27, 235. 29   $14, 202. 73
                                                                                                          ------------
                                                                                                            $12, 700. 67
Total expended.....-----------------------     28, 929. 80    11, 148. 86    34, 575. 65    14, 202.73       12, 700. 67

                                       52, 914. 63 13, 999. 63 21, 294. 69
Allotted-...........-----...................-----------------------......  12,000.00                          -102.40'


Balance unexpended July 1, 1936 --------------------------- $12, 808. 07
Deductions on account of revocation of allotment - ______-----
                                                      -  -.-     102.40
       Net amount to be accounted for _____         -______-_______- 12, 700. 67
Gross amount expended______------      -_____    ____ $13, 699. 89
Less reimbursements collected -----------------------       999. 22
                                                                     12, 700. 6T
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance ______-- _____    ____________        _ 30, 000. 00
4. APALACHICOLA              RIVER, FLA., THE CUT-OFF,                             LEE SLOUGH, ANDI
                                LOWER CHIPOLA RIVER

   Location.-The Apalachicola River is formed at the southwest
corner of the State of Georgia by the junction of the Chattahoochee
and Flint Rivers and flows south a distance of 112 miles, emptying
into Apalachicola Bay. (See U. S. Coast and Geodetic Survey Chart.
No. 183.)
   Previous projects.-The sum of $13,000 represents the cost and
expenditures between 1828 and 1831, but apparently under no definite
project. In the years 1835 and 1836 appropriations amounting to
$9,000 were made for the Chipola River, but there is no record of
expenditure of this sum. Work under existing project was begun in.
1875.
   Existing project.-This provides for a channel in the Apalachicola
River 6 feet deep at low water and 100 feet wide, to be secured by
the removal of snags and overhanging trees and by widening and
straightening Moccasin Slough, and for a channel 5 feet deep and
60 feet wide through the cut-off, Lee Slough, and lower Chipola
River. Snagging and dredging to a depth of 6 feet, of the lower
2,500 feet of the Styx River, a tributary of the Apalachicola River,
is included in the existing project. The mean range of the tide at
the mouth of Apalachicola River is 2 feet, and the variation between
low and high water is about 30 feet at the point where the river
is formed.
   The estimate of cost of new work, revised in 1923, was $106,000,
exclusive of amount expended on previous project. The latest (1928)
approved estimate of annual cost of maintenance is $15,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1874, provided for the channel in
the Apalachicola River (H. Doc. No. 241, 42d Cong., 2d sess., and
650            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Annual Report for 1873, p. 698) ; act of June 13, 1902, provided for
the work in the cut-off, Lee Slough, and lower Chipola River (Annual
Report for 1889, p. 1416). The work of snagging and dredging
in the Styx River was authorized by the Public Works Adminis-
tration January 6, 1934. No map of Apalachicola River has been
published in congressional documents. A map of the cut-off, Lee
Slough, and lower Chipola River will be found in the Annual Report
for 1891 opposite page 1696.
   Terminal facilities.-At Apalachicola, Fla., the facilities consist
of six wharves built on piling with wooden framework. The land-
ing at Blountstown, Fla., is a natural one, provided with a ware-
house, open to all carriers. The landing at River Landing, Fla.,
is a natural one, used in connection with a warehouse erected on
trestlework, and the freight is handled by double-track hoist. These
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. snag boat
Albany, from October 2, 1936, to January 12, 1937, removed 1,886
obstructions from the channel and cut 902 overhanging trees from
the banks of the Apalachicola River. The U. S. pipe-line dredge
Muscogee, operating in the waterway from mile 103.3 to mile 13.6,
from October 15 to November 15, 1936, removed 78,706 cubic yards
of material. The cost was $27,254.79, for maintenance. The expendi-
tures were $27,250.99.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1924. Work on River Styx, a tributary of the Apalachicola
River, was completed in 1934. At the end of the fiscal year the con-
traction works were in fair condition. The controlling depth is
5 feet. Boats drawing 5 feet can operate throughout the year at a
stage of zero on the River Junction gage. Greater drafts are avail-
able usually from January to July of each year.
   The total costs and expenditures for the existing project to June
30, 1937, were as follows:

                                                                      Costs
                                                                                                   Expendi-
                                                                                                     tures
                                                    New work       Maintenance      Total

                                                              $235, 110. 63 $343, 574.32
Regular funds.......--..---------------------------..........................
                                                  $108,463.69                                      $343, 570. 52
Public Works funds-.......------.-------------------14,335.12--------------14, 335. 12               14, 335. 12
      Total.     .-------------------------------   122, 798. 81    235, 110. 63   357, 909. 44     357, 905. 64



   Proposed operations.-The balance unexpended at the end of the
fiscal year, together with an allotment of $25,000 made during July,
will be applied as follows:
Accounts payable June 30, 1937------------------------------------      $3.80
Maintenance dredging to meet the needs of navigation in the Apa-
  lachicola River with the U. S. hydraulic pipe-line dredge Black-
  water, 11/2 months, September 1-15, and October 16-31, 1937, and
  June 16-30, 1938__---------------------------------------------- 22,000. 00
Maintenance snagging operations in the Apalachicola River with the
  U. S. Snagboat Albany, 11 months, from September 1-15 and No-
  vember 16 to December 15, 1937--__-----________-_--------------   7, 508.42
        Total______       _-________----------______-------------                                 29.512. 22
                RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                           651
  The additional sum of $25,000 can be profitably expended during
the fiscal year 1939 as follows:
Maintenance dredging to meet the needs of navigation in the Apa-
lachicola River with the U. S. Hydraulic pipe-line dredge Black-
water, 1 month, July 1-31, 1938--------------------------------- $15, 000. 00
Maintenance snagging operations in the Apalachicola River with the
                         1
U. S. Snagboat Albany, 1 / months, July 1-August 10, 1938-------  10, 000. 00

         Total---------------- ----                  --------------------------                          25, 000.00

                                        Cost and financial summary
Cost of new work to June 30, 1937----------------------------                                      1   $135;, 798. 81
Cost of maintenance to June 30, 1937----------------------------                                        235, 110. 63

      Total cost of permanent work to June 30, 1937------------370, 909.44
Minus accounts payable June 30, 1937___----------------               3. 80

     Net total expenditures------------------- ---------------                                         1370, 905. 64
Unexpended balance June 30, 1937 __---___------------------                                               4, 512.22

         Total amount appropriated to June 30, 1937----------                                 __       1375, 417. 86;


         Fiscal year ending June 30              1933          1934          1935             1936                1937


Cost of new work------....--------------------------  $14, 335. 12 ..
Cost of maintenance..-------..........   ------------ 14, 019. 35 $17, 500. 00
                                         __--------                                       $28, 236. 79         $27, 254. 79

      Total cost-          .
                       -------------------------------       28, 354. 47   17, 500. 00    28, 236. 79           27, 254. 79

Total expended....------------------------        $36. 64    28, 317. 83   17, 500. 00    28, 236. 79           27, 250.99
Allotted_____--.__.--.---------------           9, 998. 00   19, 021. 35   27, 500. 00     50, 000. 00----------.......


Balance unexpended July 1, 1936-----------------------------                                            $31, 763. 21
Gross amount expended------------------------------------                                                27, 250. 99
         Balance unexpended June 30, 1937-------                                                             4, 512. 22
Outstanding liabilities June 30, 1937____-- --                                           __            ---           3. 80
     Balance available June 30, 1937---------------------                                                    4, 508.42
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 ---------------------------------------                                           25, 000. 00
         Balance available for fiscal year 1938--------------------                                       29, 508. 42
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 2 - -_____ _ __ -,--  _____   -  - -
                                                             __ .                                            25, 000. 00
  1 Includes $14,335.12 Public Works funds.
  2 Exclusive of available funds.

5. UPPER CHIPOLA RIVER,                       FLA., FROM MARIANNA                        TO ITS MOUTH

  Location.-This river rises in the southeast portion of the State of
Alabama and flows in a general southerly direction through Alabama
and northwest Florida for a distance of about 125 miles, emptying
into Apalachicola River through Lee Slough and lower Chipola
River. (See U. S. Geological Survey charts for west Florida.)
  Previous projects.-In 1835 and 1836 appropriations totaling $9;000
were made for the Chipola River but there is no record of the
expenditure of this sum. Work under existing project was begun in
1900.
652           REPORT OF CHIEF OF ENGINEERS, L. d. ARMY, 1937

   Existing project.-This provides for securing a channel 3 feet deep
at low water and 60 feet wide from the foot of the Dead Lakes to
Marianna, a distance of 55 miles, by rock excavation and snagging.
The variation between low and high water is approximately 14 feet.
The original estimate of cost for new work, made in 1888, was $41,000,
exclusive of the cost of necessary plant. The latest (1928) approved
estimate of annual cost of maintenance is $5,000.
   The existing project was authorized by the River and Harbor Act
of March 3, 1899 (Annual Report for 1899, p. 1416). No map of
the upper Chipola River has been published in any congressional
documents or annual report.
   Recommended modifications of project.-The project has been rec-
oommended for abandonment (H. Doc. No. 467, 69th Cong., 1st sess.).
   Terminal facilities.-None, other than natural landings for river-
boat traffic. These landings answer the purpose, and no better
facilities are required.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 75
percent completed. The project has been completed from Look and
Tremble Shoals to the mouth. Practically no work has been done
at Look and Tremble Shoals, or from that point to Marianna,
:a distance of approximately 20 miles. The controlling depth at
the end of the fiscal year, up to Look and Tremble Shoals, the
present head of navigation, is 3.0 feet, which depth is available
throughout the year. Greater depths are usually available from
January to June. There is a gage on this stream above Look and
Tremble Shoals near Altha, Fla. The work remaining to complete
the project is the improvement from and including Look and Trem-
ble Shoals to Marianna. The cost and expenditures were $36,781.12
for new work and $63,193.43 for maintenance, a total of $99,974.55.
   Proposed operations.-No funds are available for work during the
fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal year
1939 for snagging operations which will require the operation of
the U. S. snag boat Albany for a period of about 1 month when
necessary to meet the needs of navigation.
                                            Cost and financial summary
Cost of new work to June 30, 1937-------------------                                   --------             $36, 781. 12
Cost of maintenance to June 30, 1937                                                                             193. 43
                                                                                                             6---------------------------3
      Total cost of permanent work to June 30, 1937---------------99, 974. 55
Net total expenditures-------------------------------------         99, 974. 55
Total amount appropriated to June 30, 1937---------------------     99, 974. 55

           Fiscal year ending June 30                    1933         1934      1935            1936                  1937


Cost of new work  _.   .       ..      ..      . ..       .     ...                                         .    ..     .
                        ---------------
Cost of maintenance .........--------------------                                $8, 000...------      --
Total expended             ------------------ ------------------------            8, 000                         --------
llotted         ...........--------------------------      --------------------------------..........-----
                                                          ---...                 8,00

Amount (estimated) required to be appropriated for completion
of existing project-----------------                                                                           $4, 200. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance-     -------------                                                                    5, 000. 00
         RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                653
             6. CHATTAHOOCHEE RIVER, GA. AND ALA.

   Location.-This river rises in the north central part of the State of
Georgia and flows in a southwesterly direction to West Point and
thence in a southerly direction to join with the Flint at the southwest
corner of the State of Georgia, forming the Apalachicola River.
 (See U. S. Geological Survey charts for northwest Georgia.)
   Previous projects.-The River and Harbor Act of July 13, 1892,
made an appropriation of $5,000 for the section of river between West
Point and Franklin, Ga., and appropriations therefor were continued
until 1899, when they were discontinued due to unfavorable report on
survey directed by the act of March 3, 1899 (H. Doc. No. 111, 56th
Cong., 2d sess.). The cost and expenditures on this project were
$19,719.22 for new work. (For further details see p. 1834 of Annual
Report for 1915.)
   Existing project.-This provides for securing a channel 4 feet deep
at low water and 100 feet wide from the mouth to Columbus, Ga., a
distance of 164 miles, by the removal of timber obstructions, dredg-
ing, contraction works, and shore protection. The variation between
average low and high water is approximately 20 feet. The extreme
fluctuation is 54.7 feet at Columbus.
   The estimated cost of new work, from the mouth to Columbus, Ga.,
revised in 1924, is $1,156,000, exclusive of amounts expended on pre-
vious projects. The latest (1928) approved estimate of annual cost
of maintenance is $60,000.
   The existing project was adopted by the River and Harbor Act of
Jane 23, 1874 (H. Doc. No. 241, 42d Cong., 2d sess., and Annual Re-
port for 1873, p. 699). No map of the Chattahoochee River below
Columbus has been printed in any congressional document.
   Terminal facilities.-The terminals at Alaga, Columbia, and Eu-
faula, Ala., consist of natural landings provided with warehouses
and hoists, open to all carriers on equal terms. These facilities are
considered adequate for the present commerce.
   Operations and results during fiscal year.-The U. S. snag boat
Albany, operating in the Chattahoochee River, from July 12 to
September 30, 1936, removed 2,033 obstructions from the channel and
540 overhanging trees from the banks. The U. S. pipe-line dredge
Muscogee operating in the waterway from mile 0 to mile 23.0, from
July 13 to October 14, 1936, removed 136,214 cubic yards of material.
The cost was $39,452.47, for maintenance. The expenditures were
$39,419.85.
   Condition at end of fiscal year.-The existing project is 94 percent
complete. At the end of the fiscal year, dredging, open channel work
and snagging operations had been carried on from the mouth of the
river to a point 164 miles above the mouth. The controlling depth
at the end of the fiscal year at low water was 2 feet. Vessels drawing
not more than this may operate on the river throughout the year
and 4 feet can be carried ordinarily, from January to August,
inclusive.
   The total cost was $2,090,360.28, of which $1,081,084.85 was for new
work and $1,009,275.43 for maintenance. The expenditures were
$2,090,082.12.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $3,595.17 including accounts receivable and allotment of
654                REPORT OF CHIEF OF ENGINEETrS, U. S. ARMY, 1937

$25,000 made during July 1937, will be applied to maintenance work
as follows:
Accounts payable, June 30, 1937--------------------------------        $281. 96
Maintenance dredging to meet the needs of navigation in the Chatta-
  hoochee River with the U. S. hydraulic pipe-line dredge Black-
  water, 1 month, September 16 to October 15, 1937___---__-----     15, 000. 00
Maintenance snagging operations in the Chattahoochee River with
  the U. S. snag boat Albany, about 2 months, September 16 to
  November 15, 1937-- ----------------------------------------      13, 313. 21
            Total_                     _____-__                  -__                                                    28. 595.17
  The additional sum of $25,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance dredging to meet the needs of navigation with the U. S.
hydraulic pipe-line dredge Blackwater, 1 month at such time as
may be necessary-----------------------------------------          $15, 000
Maintenance snagging operations with the U. S. snag boat Albany,
about 11/3 months, at such times as may be necessary to meet the
needs of navigation----------------------------------------------   10, 000
                Total -----------------------------------------------------                                                    25, 000
                                                     Cost and financial summary

Cost of new work to June 30, 1937_... ____-       -_______________$1, 100, 804. 07
Cost of maintenance to June 30, 1937_-__________----               1, 009, 275. 43

      Total cost of permanent work to June 30, 1937 ---  _-_----                                                 2, 110, 079. 50
Plus accounts receivable June 30, 1937_____________________      _                                                         3. 80

      Gross total costs to June 30. 1937____________________                                                     2, 110, 083. 30
Minus accounts payable June 30, 1937______________________-  _                                                           281. 96
     Net total expenditures _____________-______
Unexpended balance June 30, 1937 ----___- _____________--
                                                                                                         __-     2, 109, 801. 34
                                                                                                                      3, 591. 37
            Total amount appropriated to June 30. 1937__________                                             - 2, 113, 392. 71

            Fiscal year ending June 30                             1933          1934          1935         1936                1937


Cost of new work....--------------------------------------------------------------                                               -
Cost of maintenance-...........-.......                         ____________ _____--   ____ ________..   $26, 234. 32         $39, 452. 47
Total expended.....................----------------------$21,924.63 --------------        _                  988. 78
                                                                                                             925,              39, 419. 85
Allotted--------........................----------------.....   -- 33,850.55                              69, 000. 00    ..     .      .


Balance unexpended July 1, 1936 ______                                                                              $43, 011. 22
Gross amount expended_    ____--   __----__--                                                 $39. 442. 35
Less reimbursements collected----------------------                                                 22. 50
                                                                                                                        39, 419. 85

      Balance unexpended June 30, 1937_                                                                                  3,591.37
Outstanding liabilities June 30, 1937______-                                              ___-----___                      281. 96

      Balance available June 30, 1937                                                                                    3, 309. 41
Accounts receivable June 30, 1937___                                                                                          3. ~0

     Unobligated balance available June 30, 1937-                                                                        3, 313. 21
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937.   ..------ .........................                                                           25, 000. 00

            Balance available for fiscal year 1938____                                           __                     28, 313. 21
                    RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                      655
Amount (estimated) required to be- - appropriated            for completion
                      1- - - - - - - - - - - - ---- --- --- --- --- --- --- ---
  of existing project                                                                                      $75, 000. 00
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance ---- ---------------------------                                          25, 000. 00
   1 Exclusive of available funds.

                    7. CHATTAHOOCHEE RIVER, GA., FLOOD CONTROL

    Location.-The project is located on the Chattahoochee River, Ga.
and Ala., and covers the section of the river from the city of West
Point, Ga., to Langdale Dam, a distance of approximately 7 miles.
    Existing project.-There is no approved project covering this work.
The work to be done consists of increasing the cross section of the
Chattahoochee River at critical points between West Point, Ga., and
Langdale Dam, clearing of the floodway on both banks, constructing
an earth levee 1,500 feet long, and the construction of an additional
span in the highway bridge at West Point, Ga.
    The work was authorized by the President August 12, 1935, under
the provisions of the Emergency Relief Appropriation Act of April
8, 1935.
    Local cooperation.-Fully complied with.
    Operations and results during fiscal year.-To increase the cross
section of the river, from July 1 to August 24, 1936, 208,073 cubic
yards of material were removed, and 309 cubic yards of stone were
placed July 1 to August 10, 1936, for protection of bank and piers.
The contractor completed construction of additional spans in the
highway bridge at West Point, Ga., August 21, 1936. All the above
work was new work, performed with funds provided from the
Emergency Relief Appropriation Act of 1935. The cost was $115,-
593.56, for new work. The expenditures were $131,082.80.
    Condition at end of fiscal year.-The project was completed in 1937.
The total cost, all from Emergency Relief funds, was $591,068.24,
charged to new work. The expenditures were $591,063.64.
   Proposed operations.-The balance unexpended will be applied to
payment of outstanding liabilities and the remainder will be revoked.
                                              Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                         $591, 068. 24
Cost of maintenance to June 30, 1937

     Total cost of permanent work to June 30, 1937--------------591,                                           068. 24
Minus accounts payable June 30, 1937---------------------------                                                  4. 60

     Net total expenditures----------------------------------591,                                              063. 64
Unexpended balance June 30, 1937-----------------   -------                                                     36. 30

           Total amount appropriated to June 30, 1937_                              _----___           591, 100. 00

           Fiscal year ending June 30                     1933       1934          1935         1936            1937

                         .....-------
Cost of new work...----------..       ----------   -------------------- $475,474.68 $115,593.56
Cost of maintenance----------------- ----------- ---------------------------------- ----------
,Total expended--....         -------------       --    ---------       -   ------------    459, 980. 84      131, 082. 80
Allotted----------........-------.......-------        -----------   --------------------   596, 500.00         5, 400.00

          20196--37-pt. 1-42
656       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 --------------------                   $136, 519. 16
Deductions on account of revocation of allotment----                      5, 400. 00

       Net amount to be accounted for------------             ---       131, 119. 16
(cross amount expended-------------------------$134, 526. 49
Less:
    Reimbursements collected--                    317. 44
                                              $--------3,
    Receipts from sales-----------------          126. 25
                                                          3, 443. 69
                                                                        131, 082.80
      Balance unexpended June 30, 1937 --        _____-_____--            -36.      36
Outstanding liabilities June 30, 1937__------------------------ -                4. 60

      Balance available June 30, 1937 __-______-----_                            31.76

8. INTRACOASTAL       WATERWAY FROM APALACHICOLA                    BAY    TO     ST.
                          MARKS RIVER, FLA.

   Location.-The waterway, 84 miles long, connects Apalachicola,
Bay and St. Marks River, Fla. The waterway follows Apalachicola
Bay, Fla., St. George Sound, Carrabelle, Crooked, and Ochlockonee,
Rivers, and Ochlockonee and Apalachee Bays, and St. Marks River.
 (See U. S. Coast and Geodetic Survey Charts Nos. 182-183.)
   Existing project.-This provides for a channel 9 feet deep and
100 feet wide at mean low water from Apalachicola Bay, Fla., via,
St. George Sound, Carrabelle, Crooked, and Ochlockonee Rivers, and
Ochlockonee and Apalachee Bays to St. Marks River, Fla. The
mean range of tide is 3/4 feet, and the extreme range, except during
storms, 3 feet.
   The estimated cost made in 1937 is $480,000 for new work and
$15,400 annually for maintenance.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 291, 75th Cong., 1st sess.), which
document contains the latest published map.
   Local cooperation.-The act adopting the existing project provides
that local interests undertake all necessary modifications to bridges
over the waterway, furnish free of cost to the United States neces-
sary rights-of-way and suitable spoil-disposal areas for new work
and for subsequent maintenance as required, and release the United
States from all claims for damages incidental to the work of
improvement.
   Terminal facilities.-At Apalachicola, Carrabelle, Harbeson City,
and St. Marks there are terminals, consisting for the most part of
timber wharves, many of them provided with frame warehouses cov-
ered with galvanized iron. Numerous small privately owned wharves
are found along some sections of the waterway.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
waterway. The controlling depths ascertained in 1937 were as fol-
lows: Apalachicola Bay, 9 feet; St. George Sound, 10 feet; Car-
rabelle River, 4.5 feet; Crooked River, 2 feet; Ochlockonee River, 7
feet; Ochlockonee Bay, 7 feet; Apalachee Bay, 12 feet; St. Marks
River, 10 feet.
  Proposed operations.-No funds are available and no operations
are contemplated for the fiscal year 1938.
           RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                       657
  The sum of $480,000 can be profitably expended during the fiscal
year 1939 for new work in the dredging of the canal to project
dimensions, by contract, over a period of about 10 months, Septem-
ber 1, 1938, to June 30, 1939.
                          Cost and financial summary

Total amount appropriated to June 30, 1937------------------------ --------
Amount (estimated) required to be appropriated for completion of
  existing project-----------------------------------------            $480, 000
.Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work---------------------------------------480,              000

'9. CHANNEL FROM APALACHICOLA RIVER TO ST, ANDREWS BAY, FLA.

   Location.-This waterway extends from a point 6 miles above the
mouth of the Apalachicola River in a northwesterly direction through
Lake Wimico, thence to East Bay, an arm of St. Andrews Bay, Fla.
(See U. S. Coast and Geodetic Survey Chart No. 184.)
   Existing project.-This provides for a channel 9 feet deep and
100 feet wide with three cut-offs from Apalachicola River to St.
Andrews Bay, Fla., by way of the natural waterways indicated
above. The mean range of tide is 2 feet and the extreme range,
except during storms, 3 feet.
   The estimated cost of new work, revised in 1935, is $845,900, with
$4,000 for annual maintenance.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910 (H. Doc. No. 670, 61st Cong.,
2d sess.), provided for a channel 5 feet deep at mean low water and
65 feet wide at the bottom; the Emergency Relief Appropriation Act
of 1935, under date of May 28, 1935, and the River and Harbor Act
of August 30, 1935, provided for the present project dimensions
 (Rivers and Harbors Committee Doc. No. 52, 72d Cong., 2d sess.).
'The latest published map of this locality will be found in the latter
document.
   Local cooperation.-The act of August 30, 1935, requires that local
interests shall provide, without cost to the United States, all rights-
of-way for the construction of the waterway, and shall furnish, free
of cost to the United States, suitable areas for disposal of dredged
material during initial construction and future maintenance as and
when needed.
   All rights-of-way for the construction of the waterway have been
provided, and suitable areas for disposal of dredged material during
initial construction have been furnished.
   Terminal facilities.-None.
   Operations and results during fiscal year-Regular funds.-The
contractor's pipe-line dredge Manatee, from February 18-19, 1937.
removed 23,959 cubic yards of material. The total cost was $4,403.52,
of which $2,892.14 was for new work and $1,511.38 for maintenance.
The expenditures were $4,378.67.
   Emergency relief funds.-The right-of-way required for the con-
struction of the channel was cleared by contract from July 1, 1936,
to January 14, 1937. The contractor operating with a dragline re-
moved 407,453 cubic yards of material from July 1, 1936, to January
14, 1937. The contractor's pipe-line dredge Manatee removed
658           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

3,139,033 cubic yards of material from July 1, 1936, to February 17,
1937. The total cost was $252,018.09, charged to new work. The
expenditures were $275,980.11.
   The costs for the fiscal year, all funds, were $254,910.23 for new
work and $1,511.38 for maintenance, a total of $256,421.61. The
total expenditures were $280,358.78.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1937. The controlling depth at the end of the fiscal year
is 9 feet.
   The total costs and expenditures for the existing project to June
30, 1937, were as follows:

                                                                                                   Costs
                                                                                                                                     Expenditures
                                                                         New work           Maintenance              Total

Regular funds_-------------- -------------                                $508, 822. 15       $102, 203. 06        $611, 025.21        $611, 000. 36
Emergency relief funds......------------ ---------                         340, 000. 00       -_
                                                                                               _  _-_               340, 000.00         340, 000. 00

      Total        ..------------------------------                          848, 822. 15      102, 203.06          951, 025. 21        951, 000. 36



   Proposed operations.-The balance unexpended at the end of the
fiscal year, $2,621.33 plus an allotment of $10,000 made during July
1937, will be applied to maintenance dredging with the United
States hydraulic pipe-line dredge Black water about three-fourths
month.
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1939 in the operation of the United States hydraulic
pipe-line dredge Blackcwater about 2 months on maintenance dredg-
ing.
                                                   Cost and financial summary
                                    MAINTENANCE                     AND IMPROVEMENT                  FUNDS


Cost of new work to June 30, 1937_-------------__                                                                              $508, 822. 15
Cost of maintenance to June 30, 1937                                                                                            1---------------------
                                                                                                                             -102,    203. 06

     Total cost of permanent work to June 30, 1937----------                                                                         611, 025. 21
Minus accounts payable June 30, 1937--------------------------                                                                             24. 85

     Net total expenditures__------__--------------                                                                                611, 000. 36
Unexpended balance June 30, 1937------------------------------                                                                       2, 621. 33

        Total amount appropriated to June 30, 1937_--                                                         _______              613, 621. 69

        Fiscal year ending June 30                                    1933             1934            1935              1936             1937


Cost of new work ------
                  .   .    - - __ -      ------------
                                                    -  __      _                                     _--
                                                                                                      - --...           .-..             $2, 892. 14
Cost of maintenance-    ----------------- $47, 889. 58 $6, 534.04                                    $2, 417. 50       $2, 008. 39        1, 511. 38
      Total cost           .. _..----------------------             47, 889. 58       6, 534. 04      2, 417. 50        2, 008. 39        4. 403, 52
Total expended               ..----------------------               57, 603. 51       7,118. 55       2, 417. 50        2, 008. 39        4,378. 67
Allotted...            .     ........----------------------------   29, 970. 01       8, 500. 00     10, 000.00       -8,001.49           7,000. 00

Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-       -      -      -    -      -  -   $60, 000. 00
Deductions on account of revocation of allotment- ------   -53,   000. 00
         Net amount to be accounted for---
                                        ...                                                                                            7. 000. 00
                  RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                            659
Gross amount expended _-- _-_                 ______-_-_--------_$4, 508. 65
Less reimbursements collected                ------------------------                       129. 98
                                                                                                                $4, 378. 67

      Balance unexpended June 30, 1937______                                                                     2, 621.33
Outstanding liabilities June 30, 1937------------------------------                                                  24. 85
    Balance available June 30, 1937_______--------------------                                                   2, 596.48
Amount allotted during July, 1937-------------------------------                                                10, 000.00
           Balance available for fiscal year 1938 --------------------                                          12, 596. 48
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1-------------------------------------                                               30, 000. 00
   I   Exclusive of available funds.

                                        EMERGENCY RELIEF FUNDS


Cost of new work to June 30, 1937 _                                                                               000. 00
                                                                                                             $--------------------
                                                                                                            $340,
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937 ~----------                                              340, 000. 00
Net total expenditures________--- ______________                                                             340, 000. 00
Total amount appropriated to June 30, 1937 _________________-__                                              340, 000. 00

           Fiscal year ending June 30             1933          1934            1935                 1936           1937


Cost of new work------.....-----------------------------.........------------$87, 981. 91                        $252, 018. 09
Cost of maintenance------------------------------                ----------
'Total expended------------------- --------------------- ----------                               64,019.         275,980.11
Allotted.......---------------------------------------------...$340,000. 00


Balance unexpended July 1, 1936_- --                           ___________________$275, 980. 11
Gross amount expended-----------------------                        - $276, 391.38
Less reimbursements collected -..                                           411. 27
                                                                                    275, 980. 11
CONSOLIDATED COST AND FINANCIAL SUMMARY FOR APALACHICOLA RIVER--ST, ANDREWS
                                               BAY CHANNEL

Cost of new work to June 30, 1937 _-_-    -    -   -    -____ ___- $848, 822.15
Cost of maintenance to June 30, 1937----------------------------102, 203.06

      Total cost of permanent work to June 30, 1937------------                                              951, 025. 21
Minus accounts payable June 30, 1937---------    __--- -------                                                     24.85
     Net total expenditures ----------------------------------- 951, 000. 36
Unexpended balance June 30, 1937______________              -_____________
                                                                    2, 621. 33
          Total amount appropriated to June 30, 1937_-                                      -_               953, 621. 69

           Fiscal year ending June 30             1933          1934            1935                1936            1937


Cost of new work ___     ____           __    ____________                  ___________          $87, 981.91     $254, 910. 23
Cost of maintenance ._ ------------------      $47, 889. 58   $6,534. 04      $2, 417.50           2, 008. 39       1, 511. 38
        Total cost_ ----------------------- 47, 889. 58        6, 534. 04      2, 417. 50         89, 990. 30     256, 421. 61
Total expended.......-----------------------57, 603. 51        7, 118. 55      2, 417. 50         66, 028. 28     280, 358. 78
Allotted     -----------------------------      29, 970. 01    8, 500. 00    350,000. 00         -8, 001.49         7,000. 00
660        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 ------------------------------   $275, 980.11
Amount allotted from War Department Appropriation Act approved
  May 15, 1936--------------------------------------------------   60, 000. 00

      Amount to be accounted for _------                 --------------------   335, 980. 11
Deductions on account of -----------------------------------                     53, 000. 00

      Net amount to be accounted for                                                  980. 11
                                                                                2-------------------------82,
Gross amount expended_ ------------------------                 $280,900.03
Less reimbursements collected ----------------------                 541. 25
                                                                                280, 358. 78
      Balance unexpended June 30, 1937------------------------                    2, 621. 33
Outstanding liabilities June 30, 1937------------------------------                   24. 85

     Balance available June 30, 1937_----------------------------                 2, 596. 48
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------                     4, 500. 00

       Balance available for fiscal year 1938---------------------                 7, 096.48

Amount that can be profitably expended in fiscal ending June 30,
1939, for maintenance __-----------------------------------                     30, 000.   00
  1 Exclusive of available funds.

10. WATERWAY FROM CHOCTAWHATCHEE                          BAY TO WEST BAY, FLA.

   Location.-This waterway will extend westward from West Bay,
an arm of St. Andrews Bay, Fla., through West Bay Creek, thence
westward by a land cut entering Choctawhatchee Bay in the vicinity
of Point Washington, Fla., approximately 2 miles south of the mouth
of the Chactawhatchee River, a total distance of 26 miles.
   Existing project.-This provides for a channel 100 feet wide and:
9 feet deep at mean low water from Choctawhatchee Bay to West
Bay, Fla: The mean range of tide in the two bays is about 1.4 feet.
   The estimate of cost for new work made in 1935 is $1,770,000 with
$10,000 for annual maintenance.
   The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (H. Doc. No. 259, 72d Cong., 1st sess.).
The latest published map is in the project document.
   Local cooperation.- The act adopting the existing project provides
that local interests shall provide, without cost to the United States,
all rights-of-way required for the construction of the waterway and
suitable spoil-disposal areas for construction and for maintenance
when and as needed, provide, operate, and maintain a draw opening
suitable for navigation in the existing highway bridge near the mouth
of West Bay Creek, and construct, operate, and maintain all other
bridges over the waterway.
   All rights-of-way required for the construction of the waterway,
and suitable spoil-disposal areas for construction, have been provided.
A draw opening suitable for navigation in the existing highway
bridge near the mouth of West Bay Creek has been provided, and is
being operated and maintained as required.
   Terminal facilities.-None. No terminal facilities are necessary
along the canal.
   Operations and results durinq fiscal year.-The contractor, operat-
ing in section B of the waterway, removed with pipe-line dredge
Pnnta Gorda, from August 4, 1936, to October 23, 1936, 304,051 cubic
                  RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                               661
yards of material; the pipe-line dredge Tennessee, from October 8,
1936, to June 30, 1937, removed 2,192,866 cubic yards of material;
the pipe-line dredge No. 4, from January 4 to June 30, 1937, removed
602,955 cubic yards of material; and with dragline, from August 4,
1936, to June 30, 1937, removed 770,474 cubic yards of material. The
contractor, operating in section A of the waterway, from August 18,
1936, to June 30, 1937, removed with pipe-line dredge Duplex,,
5,218,511 cubic yards of material. The cost was $720,289.35, all for
new work. The expenditures were $562,601.76.
   Condition at end of fiscal year.-The existing project is 46 percent
completed. The controlling depth over the completed portion of this,
waterway on June 30, 1937, was 10 feet. The total cost was $720,-
971.67, charged to new work. The expenditures were $562,720.71.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $437,279.29 and allotment of $530,000 made during July
1937 will be applied to new work as follows:
Accounts payable June 30, 1937 _    __    ___--__------------------ $158, 250. 96
New work: Dredging by contract approximately 11,000,000 cubic
  yards of material to complete the construction of this canal to
project dimensions July 1, 1937, to June 30, 1938--------------     809, 028. 33,

           Total------------------___                    ---------------------------                           967, 279.29
   The additional sum of $50,000 can be profitably expended during
the fiscal year 1939, in maintenance operations, removing shoals
caused principally by caving banks, by the operation of a United
States hydraulic pipe-line dredge for a period of approximately 3
months, as may be necessary.
                                        Cost and financial summary

Cost of new work to June 30, 1937_ --------------------------                                                 $720, 971. 67
Cost of maintenance to June 30, 1937----    --------------------------

      Total cost of permanent work to June 30, 1937_-------                                                    720, 971. 67
Minus accounts payable June 30, 1937--------------------                                                       158, 250. 96

     Net total expenditures-  ----------                                                                       562, 720. 71
Unexpended balance June 30, 1937 ------------------------                                                      437, 279.29

           Total amount appropriated to June 30, 1937-------------                                          1, 000, 000. 00

           Fiscal year ending June 30                    1933            1934          1935            1936             1937


                  ... ___..
Cost of new work___-                ____-----------. .    .     .. _.__ ...-.   -.       ..            $682. 32 $720, 289. 35
Cost of maintenance-----                                         -------   ----------- -          -----------------------
Total expended      _---        -           -                 ---.....                                  118. 95      562, 601. 76

Allotted                                                                                           1,000,000.00     ------------


Balance unexpended July 1, 1936----------------- ----------- -- $999, 881.05
Gross amount expended      ---------------------------------- 562, 601. 76
      Balance unexpended June 30, 1937---------------                                                             437, 279.29
Outstanding liabilities June 30, 1937--------------- $158, 250.96
Amount covered by uncompleted contracts ----------    809, 028. 33
                                                                                                               967, 279. 29

           Balance available June 30, 1937--.---------                                        -        --         530. 000. 00,
662       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-- ------------------------------------- $530, 000. 00
Amount that can be profitably- - expended    in fiscal year ending June
                                 -- -- -- -- ------ ------ ------ ------ --
30, 1939, for maintenance 1                                                  50, 000. 00
  1 Exclusive of available funds.

11. INTRACOASTAL WATERWAY                 FROM     CHOCTAWHATCHEE             BAY TO
      PENSACOLA BAY, FLA.           (NARROWS      IN   SANTA ROSA SOUND)

    Location.-This is a narrow body of water about 34 miles in length,
with a width ranging from 11/2 miles at its junction with Pensacola
Bay on the west to a width of about 150 yards at the east end, where
it joins Choctawhatchee Bay. (See U. S. Coast and Geodetic Survey
Chart No. 186.)
    Existing project.-This provides for a channel 100 feet wide and
 -9 feet deep at mean low water from Choctawhatchee Bay to Pensa-
cola Bay, Fla., through The Narrows in Santa Rosa Sound. The mean
range of tide in the sound is 1.4 feet. The extreme range, except
during storms, is about 3 feet.
    The estimated cost of new work, revised in 1935, is $39,000. The
latest (1935) approved estimate for annual cost of maintenance is
'$7,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for a channel 6 feet
deep at mean low water, with no reference to width (H. Doc. No.
565, 61st Cong., 2d sess.); the act of August 30, 1935, modified the
existing project to provide for the present dimensions (Rivers and
Harbors Committee Doc. No. 42, 73d Cong., 2d sess.). The latest
published map is in the latter document.
    Terminal facilities.-None, other than natural landings and about
10 small boat landings used by fishing boats and trading launches.
These facilities appear to be adequate for present commerce.
    Operations and results during fiscal year.-The U. S. pipe-line
dredge Pascagoula, from September 10 to October 13, 1936, re-
moved 61,004 cubic yards of material, maintenance, and 147,849
cubic yards of material, new work.       The cost was $21,257.12 of
which $14,263.20 was for new work, and $6,993.92 for maintenance.
The expenditures were $21,257.12.
    Condition at end of #scal year.-The existing project was com-
pleted in 1937, at a saving of $2,210 under the estimated cost. On
June 30, 1937, a channel 9.0 feet deep and 100 feet wide was avail-
able throughout this waterway. The total costs and expenditures
were $36,789.06 for new work, and $70,876.24 for maintenance, a total
of $107,665.30.
   Proposed operations.-No funds are available for work during the
fiscal year 1938.
   The sum of $20,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging for a period of approximately
1 month in the operation of a United States hydraulic pipe-line
dredge in restoring project dimensions in this waterway at such
times as may be required.
                  RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                   663
                                      Cost and financial summary

Cost of new work to June 30, 1937____----------------------------- $36, 789.06
Cost of maintenance to June 30, 1937________________-----------70, 876. 24
      Total cost of permanent work to June 30, 1937-------------- 107,665. 30
Net total expenditures___________---------__                      107, 665. 30
Total amount appropriated to June 30, 1937---------------------- 107, 665.30

         Fiscal year ending June 30                 1933          1934          1935         1936           1937


Cost of new work _     _         ------------ --------------------------------------------                $14, 263. 20
Cost of maintenance.........------------------- $40, 021.46 .......------------ $7, 030. 41 -----------     6, 993. 92

Total expended_--------     _-----------------    38, 986.83    $1, 618. 76    7,081.24------------21,        257. 12
Allotted--- ..-   ........---------------------   42, 436. 63    2, 841.09------------       $15,000        6. 257. 12


Balance unexpended July 1, 1936_     ___-- ____-------____ $15,000.00
Amount allotted from War Department Appropriation Act ap-
  proved Apr. 9, 1935------------------------------------------- 7, 000. 00

      Amount to be accounted for .--------.                   ---  22, 000. 00.
Deductions on account of revocation of allotment------------------     742. 88
      iet amount to be accounted for_________________________                                          21,257. 12
Gross amount expended- -__._______-____________ $21, 257.96
Reimbursements collected----------------------------         .84
                                                                                                       21, 257. 12
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance-------------------------------------20, 000. 00
12. INTRACOASTAL WATERWAY                                FROM PENSACOLA                   BAY,      FLA., TO
                                          MOBILE BAY, ALA.

  Location.-The waterway, 40.7 miles long, connects Pensacola
Bay, Fla., and Mobile Bay, Ala. The waterway follows Pensacola
Bay, Big Lagoon, Old River, Perdido Bay, Bay La Lanche, Wolf
Bay, Portage Creek, Oyster Bay, Bon Secours River and Bay, and
Mobile Bay. (See U. S. Coast and Geodetic Survey Charts Nos.
1265 and 1266.)
  Existing project.--This provides for a waterway 9 feet deep at
mean low water and 100 feet wide at the bottom from Pensacola Bay
to Mobile Bay through the natural waterways indicated above and
dredging the connecting links between these waterways. The mean
range of tide is about 1.2 feet, and the extreme range, except during
storm, 3 feet.
  The estimate of cost for new work, made in 1929, was $600,000,
with an annual maintenance cost of $29,000 for the first 3 years and
$10,000 thereafter.
  The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 42, 71st Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are facilities at Pensacola and Mobile
and a small warehouse and wharf at Southport, Ala., where State
Highway No. 3 crosses the canal.
;664             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year.-The U. S. pipe-line
dredge Pascagoula, from October 14, 1936, to January 6, 1937, re-
moved 1,400,331 cubic yards of material. The cost was $50,019.93 for
maintenance. The expenditures were $50,019.93.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934, at a saving of $156,694 under the estimated cost.
18.0
The controlling depth, based on soundings taken in June 1937, is
     feet. The total cost was $603,265.06, of which $443,455.89 was
for new work and $159,809.17 for maintenance. The total expendi-
tures were $603,265.06. Included in the total cost for maintenance
is an item of $1,000 for dredging in Wolf Creek, and $1,000 for
dredging in Soldier Creek, Ala., under section 3 of the River and
  IHarbor Act of July 3, 1930.
   Proposed operations.-An allotment of $30,000 made during July

-ect
1937 will be applied to maintenance work in the restoration of proj-
    dimensions in this waterway by the operation of a United States
hydraulic pipe-line dredge for a period of about 11/2 months at such
locations as may be necessary.
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1939 on maintenance work in the removal of shoals
by the operations of a United States hydraulic pipe-line dredge for
-a period of about 11/2 months at such times as may be necessary.
                                              Cost and financial summary
-Cost of new work to June 30, 1937----------------------------                                                  $443, 455. 89
Cost of maintenance to June 30, 1937------ __----------------                                                   159, 809. 17

       Total cost of permanent work to June 30, 1937 -----------                                                 603, 265. 06
Net total expenditures_ ____---.                               ________                                         603, 265. 06
Total amount appropriated to June 30, 1937-------------------                                                   603, 265. 06

     Fiscal year ending June 30                  1933              1934             1935           1936              1937


Cost of new work ...             -........   $187, 800. 89     $163,757. 55 .-----        ----------------------------
"Cost of maintenance_---------.............    ._                 19, 797. 53     $59, 595. 18   $27, 250. 87       $50.019. 93
        Total cost-................            187, 800. 89      183, 555. 08     '59, 595. 18    27. 250.87         50, 019. 93
Total expended .................----           127, 574. 52      234, 593. 68      60, 565. 01    26, 789. 38        50, 019. 93
Allotted.........................              233, 627. 48       39, 871. 30      67, 000.00     20, 000. 00        29, 942. 28


Balance unexpended July 1, 1936----------------------      --- $20, 077.65
Amount allotted from War Department Appropriation Act approved
  May 15, 1936_ -------------------------------------------      30, 000. 00

      Amount to be accounted for _______________---__---                                                          50, 077. 65
Deductions on account of revocation of allotment -----------                                                          57. 72

      Net amount to be accounted for_________________   __-------- 50, 019. 93
Gross amount expended ____________________-___ $50,239. 45
Less reimbursements collected_--___
                                 -    --------     __ -- 219. 52
                                                                   50, 019.93

Amount allotted during July 1937___       ______---______               30, 000. 00
Amount available for fiscal year 1938__ __--    -         -__________--30, 000. 00
Amount that can be profitably expended in fiscal year ending June
     30, 1939, for maintenance 1 -                   --- --      - ---
                                                              _ __,_      --- -
                                                                                                                  30, 000. 00
    xExclusive of available funds.
          RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                 665
   13. INTRACOASTAL    WATERWAY, MOBILE BAY, ALA.,          TO NEW
                           ORLEANS, LA.

   Location.-This section of the intracoastal waterway, 119 miles in
length, extends from the 10-foot contour in Mobile Bay via Missis-
sippi Sound and Lake Pontchartrain to the State-owned Inner Har-
bor Navigation Canal at New Orleans. (See U. S. Coast and Geo-
detic Survey Charts Nos. 1266 to 1269.)
   Previous projects.--Lake Pontchartrain Channel, adopted by the
River and Harbor Acts of August 30, 1852, June 25, 1910, and Au-
gust 8, 1917. The total costs under these projects were $61,669.42, of
which $56,372.22 was for new work and $5,297.20 was for mainte-
nance. The total expenditures were $58,138.77.
   Mobile Bay-Mississippi Sound Channel adopted by the River and
Harbor Acts of May 23, 1828, and July 25, 1912. The total costs
for all previous projects were $172,411.42, of which $101,976.81 was
for new work and $70,434.61 was for maintenance. The total expen-
ditures were $168,831.30. For further details, see pages 906 and 962
of the Annual Report for 1930.
   Existing project.-This provides for a straight channel 300 feet
wide and 10 feet deep from the 10-foot contour in Mobile Bay to
the 10-foot contour in Mississippi Sound, and a channel 100 feet
wide and 9 feet deep from the 9-foot contour in Grand Island Pass
connecting Lake Borgne with Mississippi Sound through the Rigo-
lets and Middle Ground Channel in Lake Pontchartrain to the 9-foot
contour in Lake Pontchartrain near the end of the Inner Harbor
Navigation Canal. Under ordinary conditions, the mean tidal range
is about 13/4 feet and the extreme tidal range is about 3.4 feet.
   The estimate of cost for new work, revised in 1930, exclusive of
amounts expended on previous projects, was $75,000, of which $55,000
applies to the 10-foot channel and $20,000 to the 9-foot channel. The
latest (1929) approved estimate for annual cost of maintenance is
$21,000, of which $7,000 applies to the 10-foot channel and $14,000 to
the 9-foot channel.
   The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (Rivers and Harbors Committee Doc. No. 4,
71st Cong., 1st sess., 10-foot channel, and H. Doc. No. 341, 71st Cong.,
2d sess., 9-foot channel). The first-mentioned document contains the
latest published map of the 10-foot channel.
   Terminal facilities.-There is a wharf and landing at Mandeville.
The Industrial Canal and New Basin Canal, both controlled by the
State of Louisiana, are the terminals for most of the traffic on
Lake Pontchartrain. The existing terminal facilities are considered
adequate.
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Wahalak operating in the Mobile Bay-Mississippi Sound
section of the waterway, from August 9 to 27, 1936, removed 434,333
cubic yards of material. The cost was $11,222.34 for maintenance.
The expenditures were $11,222.34.
   Condition at end of fiscal year.-The project was completed in
1933. The controlling depths, ascertained in June 1937, were as fol-
lows: Mobile Bay to 10-foot contour in Mississippi Sound section,
666           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

10.0 feet; mouth of Rigolets section, 9.0 feet; New Orleans, mouth of
Rigolets section, 9.0 feet. The total cost was $136,354.48, of which,
$77,907.70 was for new work and $58,446.78 for maintenance. The
total expenditures were $139,934.60.
   Proposed operations.-No funds are available for work during the
fiscal year 1938.
   The sum of $30,000 can be profitably expended during the fiscal
year 1939 on maintenance operations in the restoration of project
dimensions in the sections of this waterway subject to shoaling, by
the operation of a United States hydraulic pipe-line dredge for as
period of about 1/2 months at such time as may be necessary.
                                   Cost and financial summary
Cost of new work to June 30, 1937___                   ___---__--._________                                   $179, 884. 51
Cost of maintenance to June 30, 1937- __- .________-___---- -                                       -_         128, 881.39
      Total cost of permanent work to June 30, 1937--------------308, 765.90
Net total expenditures---------------------------------------- 308, 765. 99
Total amount appropriated to June 30, 1937 --------------------- 308,765.90

         Fiscal year ending June 30             1933             1934            1935               1936             1937

Cost of new work.....-----------      -----   $6, 907. 87
Cost of maintenance ....-------------          7, 268. 47   -----------      $24, 179. 94 ---   _                  $11, 222. 34
       Total cost_ -- ___-----           -_   14, 176. 34   ----------        24. 179. 94 -                         11, 222. 34
Total expended ......................----------------------
                                       17,055. 28   $46. 57 24, 179. 94                                  __         11,222. 34
           ----------------------------
Allotted...................                   43, 438. 45    -15. 845. 06     10, 500.00            $10, 000           902. 28


Balance unexpended July 1, 1936 ______________________________                                                 $10, 320. 06
Amount allotted from War Dept. Appropriation Act approved May
15, 1936-----------------------------------------------------                                                   1, 000. 00
          Amount to be accounted for__                                      _---------_                          11, 320.06
Deductions on account of revocation of allotment-----------------                                                     97. 72

      Net amount to be accounted for ________________________--                                                 11, 222. 34
Gross amount expended -----------------------------------------                                                 11, 222. 34

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1- -  -      -   -
                                                                                                                30, 000. 00
  1
      Exclusive of available funds.

                        14. ENTRANCE TO ST. JOSEPHS BAY, FLA.

  Location.-St. Josephs Bay is located on the northwest coast of
Florida 115 miles east of Pensacola Harbor. It is 13 miles long
from north to south by from 4 to 5 miles wide and is separated on
the west and south from the Gulf of Mexico by a sand spit, from
three-fourths to 1 mile in width, connecting with the mainland. It
connects with the Gulf of Mexico on the northwest. (See U. S.
Coast and Geodetic Survey Chart No. 184.)
  Existing project.-This provides for a channel 300 feet wide and
29 feet deep at mean low water across the bar at the entrance to the
bay, and a channel 200 feet wide and 27 feet deep from deep water
in St. Josephs Bay to Port St. Joe, with a turning basin approxi-
         RIVERS AND HARBORS-MOBILE,         ALA., DISTRICT       667
mately 6 acres in area and 27 feet deep at the proposed municipal
pier at Port St. Joe. The average tidal variation is 1.4 feet. The
extreme range, except during storms, is about 4 feet.
   The estimated cost of new work, revised in 1937, is $124,000 ex-
clusive of $20,000 contributed by local interests. The latest (1937)
approved estimate of cost for maintenance is $15,000 annually for
the first 3 years, and $5,000 annually thereafter.
   The existing project was authorized by the following River and
Harbor Acts: The act of July 25, 1912 (H. Doc. No. 660, 62d Cong.,
2d sess.), which document recommended a width of 350 feet, and
the act limited the width to 300 feet, with a depth of 24 feet across
the bar at the entrance to the bay. The act of August 26, 1937, pro-
vided for the present project dimensions. (Rivers and Harbors
Committee Doc. No. 10, 75th Cong., 1st sess.) The latest published
map of this locality will be found in the latter document.
   Local cooperation.--The act of August 26, 1937, requires that local
interests shall furnish assurances satisfactory to the Secretary of
War, that they will provide terminal facilities adequate for the
utilization of the improvement, and furnish, free of cost to the
United States, suitable spoil disposal areas for new work and for
subsequent maintenance as required; and provided further that
work shall not be undertaken until evidence satisfactory to the
Secretary of War has been presented that industrial developments
giving rise to a commerce warranting the improvement will be
carried out.
    Terminal facilities.-The 2,922-foot wharf having a depth of 30
feet at mean low water alongside, now under construction, is ex-
pected to be completed January 1, 1938; 1,000 feet of this wharf
is to be controlled by the city of Port St. Joe, and open to all on
equal terms, and the remaining 1,922 feet is privately owned, and
will be used in connection with the paper mill now under construc-
tion at this location. A pier owned by the Southern Menhaden
Co. and several small privately owned wharves at Port St. Joe
comprise the other terminal facilities on the shores of St. Josephs
Bay. The pier owned by the Southern Menhaden Co., of pile and
timber construction, extending 1,000 feet into St. Josephs Bay to a
depth of about 8 feet, is used solely by its owners for unloading
menhaden fish and transferring them to the fertilizer plant on the
shore.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project prior to modifica-
tion authorized by River and Harbor Act of August 26, 1937, was
completed in 1914. No work has been done on the modified project.
The controlling depths ascertained in 1936 were 24 feet in the chan-
nel across the bar, 6 feet in the St. Josephs Bay Channel, and 4 feet
in the turning basin. The total cost and expenditures were $20,-
105.99 for new work and $1,402.88 for maintenance, a total of $21,-
508.87, exclusive of $20,000 expended from contributed funds for
new work.
    Proposed operations.--An anticipated allotment of $104,000 to
be advanced by local interests in accordance with section 11 of the
668       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

River and Harbor Act of March 3, 1925, will be applied to new
work as follows:
Dredging by hired labor to provide project dimensions in the channel
  in St. Josephs Bay and turning basin, about 3 months, Oct. 1 to
  Dec. 31, 1937--------------------------------------------------    $57, 000
Dredging with a United States seagoing hopper dredge to provide
  project dimensions in the Outer Bar Channel, about 2 months, Oct.
  16 to Dec. 15, 1937---------------------------------------------47, 000
      Total---         --------------------------------------------      104, 000
  The additional sum of $119,000 can be profitably expended during
the fiscal year 1939 as follows:
New work: To reimburse local interests for funds advanced in order
that work could be prosecuted during the fiscal year 1938-------- $104, 000
Maintenance: Dredging to restore project dimensions in the channel
in St. Josephs Bay with a United States hydraulic pipe-line dredge
for a period of about 3/a month in June 1939____________-_____   _  15, 000
      Total for all work ----------------                             _ 119, 000

                               Cost and financial summary
Cost of new work to June 30, 1937--------------------------           $20, 105. 99
Cost of maintenance to June 30, 1937___-- ___________________-_         1, 402. 88
      Total cost of permanent work to June 30, 1937_____--_--- _       21, 508. 87
Net total expenditures____________________________                    121, 508. 87
Total amount appropriated to June 30, 1937____________________         21, 508. 87

Amount (estimated) required to be appropriated for completion of
existing project   ---------------------------------------       104, 000.00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work     ---------------------------------------      2104, 000. 00
    For maintenance-------
                 ......                                                15, 000. 00
          Total ----------------------------------------              119, 000 00
1 Exclusive of $20,000 expended from contributed funds.
2To reimburse local interests for funds advanced.

                            15. ST. ANDREWS BAY, FLA.
   Location.-This bay is located on the northwest coast of the State
of Florida, 110 miles east of the entrance to Pensacola Harbor. See
U. S. Coast and Geodetic Survey Chart No. 184.)
   Previous project.-Adopted by the River and Harbor Act of June
25, 1910. The total cost and expenditures were $717,164.67, of which
$203,560 was for new work and $513,604.67 for maintenance. For
further details of previous project see page 541 of Annual Report
for 1934.
   Existing project.-This provides for a channel extending from
deep water in the bay across Lands End to the Gulf of Mexico, 300
feet wide and 27 feet deep in the bay and across Lands End and 450
feet wide and 29 feet deep in the approach channel in the Gulf, and
protected by two jetties, each about 700 feet long. The mean tidal
range is 1.4 feet, and the extreme range, except during storms, is
about 4 feet.
   The estimated cost for new work made in 1933 was $435,000. The
latest (1935) approved estimate for annual cost of maintenance is
$40,000 annually during the first 3 years following construction and
$10,000 annually thereafter.
                RIVERS AND HARBORS-MOBILE,                                            ALA., DISTRICT                      669
   The existing project, including abandonment of the project adopted
by the act of June 25, 1910, was authorized by the River and Harbor-
Act approved August 30, 1935 (H. Doc. No. 33, 73d Cong., 1st sess.).
The latest published map of this locality will be found in the project
document. The existing project was also authorized by the Public-
Works Administration September 6, 1933.
   Local cooperation.---The act adopting the existing project provides<
that local interests shall furnish assurances satisfactory to the Secre-
tary of War that they will construct an adequate deep-water terminal
and shall furnish free of cost to the United States all rights-of-way
required for the improvement and suitable areas for disposal of
dredged material during initial construction and future maintenance
as and when needed. The conditions relative to the furnishing of all
rights-of-way have been complied with.
   Terminal facilities.-There are numerous small wharves located on
St. Andrews Bay, an oil terminal for deep-draft vessels, and one con-
crete-steel pier at Bay Harbor, owned by the municipality of Panama
City, Fla.
   Operations and results during fiscal year.-The U. S. Hopper
dredge Benyaurd, operating in the new entrance channel from July 6
to August 21, 1936, removed 956,342 cubic yards of material. The
U. S. pipe-line dredge Muscogee, operating from March 23 to April
20, 1937, removed 35,140 cubic yards of material when dredging a slip
to be used in connection with reconstruction of jetties. Two hundred
and fifty-nine feet of steel sheet piling were driven along shore line
near wing wall of west jetty from December 28-31, 1936, and Janu-
ary 11 to February 6. 1937. Four hundred and seventy-seven steel
sheet piling (7,632 square feet) were salvaged from damaged bulk-
heads from December 28-31, 1936, March 1-14, 1937, and June 1 to 30,
1937. Installed asphalt plant, assembled sand and loess stock piles,
and constructed wooden hopper for loess, sand, and gravel near
asphalt plant. Constructed wharf, and approximately 3,100 feet of
railroad track. Erected necessary office and warehouse building, all
in connection with plant layout preparatory to commencing repairs
and extension to west jetty. Built 74 forms for asphaltic concrete
blocks, and graded for extension of west jetty wing. The above work
was all maintenance. The cost was $159,328.19 for nmaintenance.
The expenditures were $144,388.17.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934. On June 30, 1937, the controlling depths were 27
feet in the channel from Bay across Lands End and 29 feet in the
approach channel in the Gulf.
   The total costs and expenditures on the existing project to June 30,
1937, were as follows:

                                                                                      Costs
                                                                                                                   Expenditures
                                                                    New work      Maintenance        Total

             ......
Regular funds--           ......                 -_ ..     ..--.-
                                                           ----             .--
                                                                    -----------    $369,959.33     $369, 959. 33     $351,810.36
Public Works funds.__...       ---           -     ---..            $581,958. 86 --.------------    581, 958. 86      581, 958. 86
      Total---------
                 ......              --.............                 581,958.86     369,959.33      951,918.19       933,769.22
670           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $86,569.72, including accounts receivable, and an allotment
of $184,000 made during July 1937, will be applied as follows:
Accounts payable June 30, 1937-------------------------------- $52, 044.01
Maintenance:
    Dredging to restore project dimensions in the new entrance
      channel with a United States seagoing hopper dredge for a
      period of about 12/3 months, when necessary to meet the needs
      of navigation--------------------------------------------- 40,000. 00
    Maintenance of jetties at the new entrance channel------------ 10, 000. 00
    Completion of repairs to existing jetties, the repair and exten-
      sion of existing wing walls, and removal of steel sheet piling
      bulkheads at the new entrance to St. Andrews Bay, Fla., all
      maintenance, with Government plant and hired labor, July
         1-Oct. 15, 1937____--                 --------------                                               168, 525.71

         Total--------------------------------------------------270,                                               569. 72
  The additional sum of $40,000 can be profitably expended during
the fiscal year 1939 as follows:
Maintenance dredging in the restoration of project dimensions in
the new entrance channel with a United States seagoing hopper
dredge for a period of about 1 month when needed------------ $25, 000. 00
Maintenance of jetties at new entrance channel-------------      15, 000. 00

           Total-----------------------------                                                                  40, 000. 00

                                      Cost and financial summary
Cost of new work to June 30, 1937---------------------------                                              $785, 518.86
Cost of maintenance to June 30, 1937------------------------                                               883, 564. 00
      Total cost of permanent work to June 30, 1937----------- 1,669,082. 86
Undistributed costs June 30, 1937-------------------------------  29, 298. 42

      Net total cost to June 30, 1937--------------------------1, 698, 381.28
Plus accounts receivable June 30, 1937-------------------------     4, 596. 62

      Gross total costs to June 30, 1937------                      702, 977. 90
                                                                 1------------------,
Minus accounts payable June 30, 1937----------------------------     52, 044.01

     Net total expenditures ---------------------------------                                             1, 650, 933. 89
Unexpended balance June 30, 1937 -----------------------------                                                81, 973. 10
         Total amount appropriated to June 30, 1937--------------1, 732, 906. 99

         Fiscal year ending June 30                 1933             1934          1935            1936             1937

Cost of new work __-----........          .-   ------------
                                                 ___            $471, 538. 13 $110, 420. 73      .
Cost of maintenance __-----------......          $37, 888. 15     14, 966. 29 136, 022. 32      $74, 608. 82     $159, 328. 19
      Total cost______-------------__             37, 888. 15    486, 504. 42   246, 443. 05     74, 608. 82      159, 328. 19
                  ----------------------
Total expended .........                          38, 246. 54    456, 330. 59   225, 783.91     122, 678.10       144, 388. 17
          ...... ------------------------
Allotted----                                      54, 870. 19    606, 963. 86   116, 803.86     116, 000. 00     f59, 709. 08

Balance unexpended July 1, 1936-------------------------------                                              $66, 652. 19
Amount allotted from War Department                              Appropriation            Act    ap-
   proved May 15, 1936----------------------------------------                                              159, 709. 08
         Amount to be accounted for--------------                                                           226, 361. 27
   1Includes $581,958.86 Public Works funds.
                RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                        671
Gross -amount expended__     ___-,    __-------
                                      -$153,                   493.23
Less reimbursements collected --------------------          9, 105. 06
                                                                         $144, 388. 71
      Balance unexpended June 30, 1937___ __----------        -----        81, 973. 10
Outstanding liabilities June 30, 1937_ __________---------------           53,498. 05

     Balance available June 30, 1937_-___-____------------     28,.475. 05
Accounts receivable June 30, 1937________111111111111111111111 4, 596. 62

     Unobligated balance available June 30, 1937--------------             33, 071. 67
Amount allotted during July 1937----------------------------              184, 000. 00

       Balance available for fiscal year 1938-____ _______-----           217, 071. 67

Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 2----------------------                    40, 000. 00
  2 Exclusive   of available funds.

                             16. LAGRANGE BAYOU, FLA.

   Location.-LaGrange Bayou is an arm of Choctawhatchee Bay,
Fla., entering the latter from the north at a point about 51/2 miles
from its most easterly limits. Flowing into the head of this bayou
is Four Mile Creek, a deep sluggish tidal stream. One and one-
half miles above the mouth of this stream is located the town of
Freeport, Fla., which is the present head of navigation. This bayou
is about 70 miles east of Pensacola Harbor and about 83 miles west
of St. Andrews Bay. (See U. S. Coast and Geodetic Survey Chart
No. 185.)
   Previous project.-Adopted by the River and Harbor Act of
March 3, 1881. The total cost and expenditures were $2,160 80, all
for maintenance. For further details see page 869 of the Annual
Report for 1931.
   Existing project.-This provides for a channel 9 feet deep and 100
feet wide from the 9-foot contour in Choctawhatchee Bay to Free-
port, Fla., a distance of approximately 41/2 miles. The normal tidal
range is about 1.4 feet, and the extreme range, except during storms,
is about 3 feet.
   The estimated cost for new work made in 1935 was $75,000 with
$2,000 for annual maintenance.
   The existing project was authorized by the following river and
harbor acts: The act of September 22, 1922, provided for a channel
6 feet deep, 100 feet wide, and approximately 10,700 feet long, ex-
tending from near the mouth of LaGrange Bayou to the mouth of
Four Mile Creek (H. Doc. No. 111, 67th Cong., 1st sess.) ; no work
was done on this project. The act of August 30, 1935, modified the
required local cooperation and provided for the. present channel
dimensions, and the extension of the project to Freeport, Fla. (Riv-
ers and Harbors Committee Doc. No. 49, 74th Cong., 1st sess.) The
latest published map is in the latter document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Small wharves and landings adequate for
small craft. There are also storage tanks for petroleum products at
Freeport, Fla.
       20196-37--pt. .1- 43
672               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year.-The U. S. derrick boat
J. M. Pratt, from July 1 to August 31, 1936, removed 22,653 snags.
The U. S. pipe-line dredge Pascagoula, from July 1 to September 9,
1936, removed 505,582 cubic yards of material, over a distance of
22,882 feet. The cost was $57,966.33, all for new work. The ex-
penditures were $64,150.62.
   Condition at end of fiscal year.-The project was completed in 1937,
at a saving of $10,849 under the estimated cost. The controlling
depth at the end of the fiscal year was 9 feet. The total cost was
$61,150.62 charged to new work. The total expenditures were
$64,150.62.
   Proposed operations.-No funds are available and no operations
are necessary during the fiscal years 1938 and 1939.
                                                 Cost and financial summary

Cost of new work to June 30, 1937--__------------------- -------- $64, 150. 62
Cost of maintenance to June 30, 1937 ---------------------------    2, 160.80

      Total cost of permanent work to June 30, 1937--------                                                                      66, 311. 4
Net total expenditures-                                                                                                           6,311.42
                                                                                                                                 6------------------------------
Total amount appropriated to June 30, 1937------------      ---                                                                  66,311.42

           Fiscal year ending June 30                                 1933           1934                 1935          1936          1937

Cost of new work__________________
                  ......................                                                       ....          ..      $6,i84.29      $57, 966.33
Cost of maintenance .......              .............          ...      ...          ......          .....       -..........              '-
                                                                                                                                         .--------
Total expended.......................-------------------- ---------------------------------------......                              64, 150.62
Allotted---.-----------------------.-----------.------..-----                                                       75,000.00
                                                                                                            .------------          -10,849.38


Balance"unexpended July 1, 1936_------------          -     ______- $75, C00.00              ______--
Deductions on account of revocation of allotment__________________   10, 849. 38

      Net amount to be accounted for---------------------------64,     150.62
Gross amount expended----------------------------------------      64, 150. 62
        17. EAST PASS CHANNEL FROM THE GULF OF MEXICO INTO
                      CHOCTAWHATCHEE BAY, FLA.

  Location.-This is the entrance from the Gulf of Mexico into Choc
tawhatchee Bay at the eastern end of Santa Rosa Island. It is 41
miles east from the west pass entrance into Pensacola Bay and 57
miles west from the entrance to St. Andrews Bay. (See U. S. Coast
and Geodetic Survey Chart No. 185.)
  Existing project.-This provides for the maintenance of a channel
not less than 6 feet deep and 100 feet wide from Choctawhatchee Bay
into the Gulf of.Mexico, at an estimated annual cost of $600. The
mean range of tide is 2 feet. The extreme range, except during
storms, is 4 feet. The project was adopted by the River and Harbor
Act approved July 3, 1930 (H. Doc. No. 209, 70th Cong., 1st Sess.).
There is no published map of the locality.
   Operations and results during fiscal year.-None. The cost and
expenditures were $235.07, charged to maintenance contingencies.
   Condition at end of fiscal year.-The controlling depth at end
of fiscal year in the dredged channel is 3.5 feet. The new (natural)
                 RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                               673
East Pass Channel to Gulf is 300 feet wide with controlling depths
at end of fiscal year of 6.0 feet at outer end and 3.5 feet at inner
end. The total cost and expenditures under the existing project
were $8,892.30, for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year $2,764.93, will be applied to maintenance dredging in
restoring project dimensions in that section of the channel south of
Destin by the operation of the U. S. hydraulic pipe-line dredge
Black-ater for a period of about one-fourth month, August 7-15,
1937.
   No additional funds can be profitably expended during the fiscal
year 1939, as it is anticipated that project dimensions will prevail in
this channel during that year.
                                           Cost and financial summary

Cost of new work to June 30, 1937        __          ___
Cost of maintenance to June 30, 1937---------------------------                                                     $8, 892.30
          Total cost of permanent work to June 30, 1937__---                                 __.____-                8, 892. 30

Net total expenditures---_-------------_----           ---                                        .8,                   892. 30
Unexpended balance June 30, 1937 ---------------------                                                          _    2, 764. 93
          Total amount appropriated to June 30, 1937-----------------                                               11, 657. 23

         Fiscal year ending June 30                            1933               1934     1935          1936           1937


Cost ofnew work         ------------------
Cost of maintenance......---------------------------------------------------------....                  .......          $235.07

Total expended----          ----
                .........-------                          -----------       ------------------------------------             07
                                                                                                                          235.
Allotted_--------            ----------------------------------------------------------                                 3, 000. 00


Amount allotted from War Department Appropriation Act approved
May 15, 1936___------ ------------------------------------    $3, 000.00
Gross amount expended------------------------------ ---            235. 07
          Balance unexpended June 30, 1937---------------------------                                                2, 764. 93
                                    18. PENSACOLA HARBOR, FLA.

  Location.-This harbor is a landlocked bay on the coast of north-
west Florida, about 40 miles east of Mobile Bay. (See U. S. Coast
and Geodetic Survey Chart No. 186.)
   Previous projects.-Authorized by the River and Harbor Act ap-
proved June 18, 1878, amended and modified by acts of August 18,
1894, and March 3, 1899. Under this project and its modifications
the total cost and expenditures were $721,338.21, of which $594,688.55
was for new work and $126,649.66 for maintenance. Work' under
existing project was begun in 1903. For further details see page
1835, Annual Report for 1915.
   Existing project.-This provides for an entrance channel 32 feet
deep at mean low water and 500 feet wide from the Gulf of Mexico
to deep water in Pensacola Bay, and an inner harbor channel parallel
to the pierhead line and not less than 50 feet therefrom. 500 feet wide
674     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and 30 feet deep, with approach channels 250 feet wide and 30 feet
deep at each end of the inner harbor channel and an approach chan-
nel 250 feet wide and 30 feet deep to the pierhead line south of the
Muscogee wharf; for a channel 100 feet wide and 15 feet deep from
that depth in Pensacola Bay to the mouth of Bayou Chico, thence
75 feet wide, 14 feet deep, and 5,800 feet long in the bayou terminat-
ing in a basin 14 feet deep and 500 feet square; and also provides
that $150,000 may be used in constructing or purchasing a seagoing
suction dredge. The mean range of tide throughout the harbor is
approximately 1.4 feet near the entrance and about 2 feet at the head
of the bay. The extreme tidal range, except during storms, is about
3 feet.
   The estimated cost of new work revised in 1937, is $511,900. The
latest (1937) approved estimate for annual cost of maintenance is
$48,500.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for securing a chan-
nel 30 feet deep at mean low water and 500 feet wide from the Gulf
of Mexico to the dock line at the east end of the city of Pensacola,
and also provides that $150,000 may be used in constructing or pur-
chasing a seagoing suction dredge; the Public Works Administration
on September 6, 1933, and the River and Harbor Act of August 30,
1935, modified the existing project to provide for the present inner
channels and the deepening of the entrance channel to 32 feet (H.
I)oc. No. 253, 72d Cong., 1st sess.) ; the act of August 26, 1937, pro-
vided for the improvement of Bayou Chico (Rivers and Harbors
Committee Doc. No. 96, 74th Cong., 2d sess.). The latest published
maps are in the two latter documents.
   Local cooperation.-Fully complied with for the harbor improve-
ment. For Bayou Chico the River and Harbor Act of August 26,
1937, provides that local interests shall furnish free of cost to the
United States all necessary rights-of-way and suitable spoil disposal
areas for new work and subsequent maintenance and release the
United States and its agents from all damages to property from the
dredging and spoil disposal.
   Terminal facilities.-Modern rail-connected terminal facilities exist
of adequate capacity for present commerce. (See Port Series no. 3,
pt. 2, revised 1929, Corps of Engineers.)
   Operations and results during fiscal year.-The U. S. hopper
dredge Benyaurd operating in the outer bar channel from August
22 to September 18, 1936, removed 465,226 cubic yards of material.
The cost was $27,392.30, charged to maintenance. The expenditures
were $27,604.81.
   Condition at end of fiscal year.-The existing project prior to the
modification authorized by the River and Harbor Act of August 26,
1937, Was completed in 1934. No work has been done on the modified
project. On June 30, 1937, the controlling depth in the entrance
channel was 32.0 feet, in the inner harbor channels 30.0 feet, and in
Bayou Chico 9.0 feet for a width of 70 feet.
                   RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                                       675
  The total costs and expenditures for the existing project to June
30, 1937, were as follows:

                                                                                     Costs
                                                                                                                            Expendi-
                                                                                                                               tures
                                                             New work          Maintenance              Total

Regular funds.....--------------------------                  $352, 249. 74     $774, 620. 64       $1, 126, 870. 38       $1, 126, 870. 38
Public Works funds. ----------------------                     119, 672. 91   --------------...
                                                                                              119, 672. 91                    119, 672. 91
        Total.        ...-----------------------------         471, 922. 65      774, 620. 64        1, 246, 543. 29        1, 246, 543. 29



    Proposed operations.-The balance unexpended at the end of the
fiscal year, $3,543.82, plus an allotment of $30,000 made during July
1937, will be applied to maintenance dredging with a United States
seagoing hopper dredge to restore project dimensions in the entrance
and inner harbor channels for a period of about 1 / months when
necessary.
   The additional, sum of $85,000 can be profitably expended during
the fiscal year 1939 as follows:
New work: Dredging the Bayou Chico Channel and turning basin to
  project dimensions by the use of a United States hydraulic pipe-line
  dredge for a period of about 2 months in the fall of 1938----------- $40, 000
Maintenance :
    Dredging with a United States seagoing hopper dredge to
      restore project dimensions in the entrance and inner
      harbor channels for a period of about 1 month when
      necessary------------------------------------------$23,     000
    Repairs to the groins at Fort McRee on the south side of
      the entrance channel in the fall of 1938__-   ____-----22, 000
                                                                        45, 000

                Total for all work -------------------- --------------------                                                    85, 000
                                            Cost and financial summary
Cost of new work to June 30, 1937---------------------------__ $1, 066, 611. 20
Cost of maintenance to June 30, 1937 -------------------------     901, 270. 30
           Total cost of permanent work to June 30, 1937                                -----------                1, 967, 881. 50
Net total expenditures--------------------------------------                                                     1, 967, 881. 50
Unexpended balance June 30, 1937___-------- __-__  -________                                                          3, 543. 82
           Total amount appropriated to June 30, 1937_-___-__-                                                   11, 971, 425. 32

           Fiscal year ending June 30                        1933             1934           1935             1936              1937


Cost of new work---------................---------------------......... $119, 626. 67        $46. 24     ............
Cost of maintenance------........-.--                 . $34, 530. 94 $35, 149. 75        24, 015. 18            $436. 87      $27, 392. 30
       Total cost.,.-----------------------               34, 530. 94    154, 776. 42    24, 061. 42           436. 87         27, 392. 30
Total expended--..--------------------                    61, 128. 52    155, 180. 99    24, 187. 63           502. 95         27, 604.81
Allotted,-.-.            ------
                         .--.          ------------       37, 901. 59    134, 747. 35    31, 207. 06       10, 000. 00       -10, 000. 00


    1 Includes $119,672.91 Public Works funds.
676          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936                                                                      $41, 148. 63
Deductions on account of revocation of allotment------------                                          10, 000, 00

      Net amount to be accounted for -----------------------                                         31,148. 63
Gross amount expended_------------------------- $44, 776. 10
Less reimbersements collected-------------------- 17, 171. 29
                                                                                                      27, 604.81

     Balance unexpended June 30, 1937_ ----------------- _._--                                         3, 543. 82
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937 ..-------------------------------                                         30, 000. 00

         Balance available for fiscal year 1938 -----                                                 33, 543. 82

Amount (estimated) required to be appropriated for comple-
tion of existing project - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _- -      40, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    40, 000. 00
   For maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    45, 000. 00
          Total 2   - -- -- --- --- -- --- -- -- --- --
                                                                                                      85, o.000.00
  2 Exclusive of available funds.

                                 19. BLACKWATER RIVER, FLA.

   Location.-This river rises in the south-central part of the State
of Alabama and flows in a southwesterly direction for a distance of
75 miles through the States of Alabama and Florida, emptying into
Blackwater Bay, an arm of Pensacola Bay. (See U. S. Coast and
Geodetic Survey Chart No. 186.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1899. The total cost and expenditures were $5,000. Work
under existing project was begun in 1906. (For further details see
p. 1834, Annual Report for 1915.)
   Existing project.-This provides for a channel 9 feet deep at mean
low water and 100 feet wide from the mouth to Milton, a distance of
10 miles, to be secured by dredging at necessary points. The river
is tidal throughout the portion under improvement. The mean range
of tide is 2 feet, and the extreme range, except during storms, is 3
feet.
   The estimated cost of new work made in 1902, exclusive of amount
expended on previous project, was $15,000. The latest (1928) ap-
proved estimate of annual cost of maintenance is $5,000. The exist-
ing project was authorized by the River and Harbor Act of March
3, 1905 (H. Doc. No. 193, 58th Cong., 2d sess.). There is no map
of the Blackwater River published in any congressional document
or annual report.
   Terminal facilities.-There is a timber wharf at Milton and one at
Bagdad, both pile structures, extending to 16 feet of water. These
facilities appear to be adequate for present commerce.
   Operations and results during fiscal year.-None. The expendi-
tures were $44.30, for accounts payable June 30, 1936.
   Condition at end of fiscal year.-The project was completed in
1916. On June 30, 1937, the controlling depth throughout the chan-
nel was 9 feet. The total cost was $122,763.59, of which $36,649.90
was for new work. and .86,113.69 for maintenance. The total ex-
penditures were $122,763.59.
                   RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                   677
   Proposed operations.-No funds are available for work during the
fiscal year 1938.
   The sum of $20,000 can be profitably expended during the fiscal
year 1939, for restoration of project dimensions, employing a United
States hydraulic pipe-line dredge for a period of about 1 month.
                                     Cost and financial summary

Cost of new work to June 30, 1937___                                                                  41, 649. 90
                                                                                                     $--------------------
Cost of maintenance to June 30, 1937----------------------------                                      86, 113. 69

      Total cost of permanent work to June 30, 1937                   763. 59
                                                                1--------------27,
Net total expenditures____----------------- ----                127, 763.59
Total amount appropriated to June 30, 1937---------------------127, 763. 59

          Fiscal year ending June 30          1933         1934          1935               1936            1937


Cost of new work ...........
Cost of maintenance---
                                    _  ------
                                        _        -.-------------
                   ...- ___-_-__---$12, 018. 53 ----------
                                                                                      :-----        ------------
                                                                                      $12, 000. 00-
Total expended_--___________--__            11, 687. 43   $375.0                        11, 955.70                 44. 30
Allotted..-------------.----.--11,             397. 41    -289. 33   $11, 975. 80 ....................


Balance unexpended July 1, 1936----------------------------------                                          $44.30
Gross amount expended-----------------------------------------                                              44.30

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance-------------- --------                 20,000. 00

                                     20. MOBILE HARBOR, ALA.

  Location.-This harbor located along the lower 5 miles of Mobile
River, is in the southwestern part of the State of Alabama, 91 miles
by water from Pensacola Harbor, Fla., on the east and 90 miles from
Gulfport Harbor, Miss., and 144 miles from the mouth of the Missis-
sippi River on the west. (See U. S. Coast and Geodetic Survey
Charts Nos. 1266 and 1267.)
  Previous projects.-The original project for the bar channel was
a4,pted by River and Harbor Act of June 13, 1902. The original
project for the bay and river channels was adopted by River and
Harbor Act of May 20, 1826, and subsequent projects adopted by
River and Harbor Acts of July 11, 1870, March 3, 1879, August 11,
1888, March 3, 1899, June 25, 1910, and August 8, 1917. The cost
was $10,779,785.79, of which $6,683,104 68 was for new work and
$4,096,681.11 was for maintenance. The total expenditures were
$11,739,246 59. For further details see page 1840 of Annual Report
for 1915, pages 802 and 807 of Annual Report for 1916, and page
833 of Annual Report for 1929.
  Existing project.-This provides for a channel across Mobile Bar
36 feet deep and 450 feet wide, and about 1.5 miles long, connecting
the 36-foot contours south and north of the bar; for a channel 32 feet
deep and 300 feet wide from deep water in Mobile Bay to a point
at the north edge of the proposed quarantine anchorage basin; for
a channel 32 feet deep and 350 feet wide from the north edge of the
quarantine anchorage basin to the mouth of Mobile River; for an
anchorage basin 32 feet deep extending 1,000 feet south from the
north edge of the present pier of the Mobile quarantine station and
200 feet west of the west edge of the dredged channel in Mobile Bay;
678     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and for a channel 32 feet deep, with a width of 500 feet, from the
mouth of Mobile River to the highway bridge across Mobile River
about 1,000 feet below the mouth of Chickasaw Creek, for easing the
bends at the mouth and about 3,000 feet above the mouth, for the
removal of sunken obstructions and for snagging in Three Mile Creek
from Mobile River to the Industrial Canal, a distance of 0 8 mile.
The plane of reference ismean low water. Under ordinary condi-
tions the mean tidal range at the lower end of. the improvement is
1.1 feet and at the upper end 1.4 feet, and the extreme tidal range is
3.4 feet at the lower end and 3.6 feet at the upper end.
   The estimate of cost for new work revised in 1937, is $554,000,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $379,000
for the first year and $377,000 annually thereafter. The existing
project was adopted by the River and Harbor Act approved July 3,
1930 (Rivers and Harbors Committee Doc. No. 26, 71st Cong., 2d
sess.); the act of August 26, 1937, modified the existing project to
provide for improvement of Three Mile Creek by snagging from the
Mobile River to the Industrial Canal (Rivers and Harbors Com-
mittee Doc. No. 69, 74th Cong., 1st sess.), and to provide a 500-foot
channel ~2 feet deep from a point about 5,000 feet south of the mouth
of Three Mile Creek to the highway bridge across Mobile River,
subject to the provision that no dredging be performed within 50
feet of any pierhead line (Rivers and Harbors Committee Doc. No.
44, 75th Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act of August 26, 1937,
authorized the increased channel width in Mobile River subject
to the provision that local interests furnish suitable spoil-disposal
areas for new work and subsequent maintenance and release the
United States from any claims for damages. All prior requirements
have been fully complied with.
   Terminal facilities.-The facilities of this port are considered ade-
quate for the existing commerce and will suffice for a considerable
increase thereof. (See Port Series No. 3, pt. 1, revised 1929, Corps
of Engineers.)
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Wahalak, operating in the Mobile Bay Channel, from July 1
to August 8, 1936, removed 974,640 cubic yards of material, over a
distance of 21,072 feet. The U. S. derrick boat J. M. Pratt operating
in Mobile River Channel from October 17, 1936, to January 4,1937
January 15 to April 27, 1937, and May 24 to June 30, 1937, removed
1,771 snags. The contractor's dredge Mobile, operating in Mobile
River Channel from May 11 to June 21, 1937, removed 765,806 cubic
yards of material over a distance of 12,304 feet. Under authority of
section 3, River and Harbor Act of July 3, 1930, the U. S. derrick
boat J. M. Prattoperating in Three Mile Creek, a tributary of Mobile
Harbor, from September 24, 1936, to October 16, 1936, removed 393
snags. The total cost was $128,962.91, all for maintenance. The ex-
penditures were $142,413.25.,
   Condition at end of fiscal year.-The existing project prior to
modification authorized by the River and Harbor Act of August 26,
1937, was completed in 1934. No work has been done on the modified
project. The controlling depths at mean low water on June 30, 1937,
were as follows: Outer Bar Channel, 36.0 feet; Mobile Bay Channel,
               RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                                679

32.0 feet; Mobile River Channel, 32.0 feet; Three Mile Creek, 18.0
feet. The total costs and expenditures on the existing project to
June 30, 1937, were as follows:

                                                                               Costs
                                                                                                                  Expendi-
                                                                                                                   tures
                                                         New work         Maintenance            Total

Regular funds--..... ...-       ...-           ..- -     $501, 513. 83   $1, 507, 591. 20    $2, 009, 105. 03   $1, 042, 642. 65
Public Works funds- ...-------- --                         14, 000. 00 --------------             14, 000.00         14,000.00
     Total_.........--.------.        ------..
                                       .       .           515, 513. 83    1, 507, 591. 20    2,023, 105. 03     1, 056, 642. 65


   Proposed operations.-The balance unexpended at the end of the
fiscal year, $11,883.04, plus an allotment of $240,000 made during July
1937, will be applied to maintenance work as follows:
Accounts payable June 30, 1937------------------------------- $7, 001. 58
Maintenance:
    Dredging in restoration of project dimensions from the mouth
      of the river to deep water in the lower end of Mobile Bay by
      contract, or Government plant and hired labor from about
      Nov. 1, 1937, to June 30, 1938..-----,__------------         193, 881. 46
    Maintenance snagging operations in Mobile River with the
      U. S. derrick boat J. M. Pratt about 6 months, Nov. 1, 1937,
      to Apr. 30, 1938_-------------------------------------26, 000. 00
    Maintenance dredging in the restoration of project dimensions
      in the Mobile Outer Bar Channel with a United States sea-
      going hopper dredge about 1 month, October 1937----------     25, 000. 00

            Total       -------------------------------------------                                             251, 883. 04
  The additional sum of $355,000 can be profitably expended during
the fiscal year 1939 as follows:
New work: Dredging by contract an additional width of 200 feet to
  a depth of 32 feet in Mobile River from a point about 5,000 feet south
  of the mouth of Three Mile Creek to the highway bridge across the
  river, about 3 months, April 1 to June 30, 1939--------------------- $76, 000
Maintenance:
    Dredging by contract, or Government plant and hired
       labor, to restore project dimensions as may be necessary
       in Mobile Bay Channel from the mouth of the river to
       deep water in the lower end of Mobile Bay, 12 months,
       from July 1, 1938, to June 30, 1939-------------- ----- $240, 000
     Snagging in Mobile River with U. S. derrick boat J. M.
       Pratt about 10 months, July 1, 1938, to Apr. 30, 1939_     35, 000
     Snagging in Three Mile Creek with U. S. derrick boat
       J. M. Pratt about 11/ months, May-June, 1939--------        4, 000
                                                                          279, 000

              Total for all work--------------------------------                                                   355, 000
                                       Cost and financial summary
Cost of new work to June 30, 1937------------------------- $7, 198, 618. 51
Cost of maintenance to June 30, 1937-----------------------5, 604, 272. 31
     Total cost of permanent work to June 30, 1937---------  12, 802, 890. 82
Minus accounts payable June 30, 1937------------------------       7, 001. 58
        Net total expenditures --------------------------                                              112,     795, 889. 24
Unexpended balance June 30. 1937_ -----------                                                               - 11, 883. 04
        Total amount appropriated to June 30, 1937 -----------                                           12, 807, 772. 28
  SIncludes $14,000 Public Works funds.
680              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


    Fiscal year ending June 30                      1933           1934                1935                1936               1937

Cost of new work_--.                        --   $234, 947. 22   $36, 072. 51        $14, 000. 00    ...          .....
Cost of maintenance .....-           ....         157, 689. 80   223, 473. 96-       253, 867. 21    $185, 706. 59          $128, 962. 91

        Total cost -------------...............--.
                               392, 637. 02 259, 546. 47 267, 867. 21                                  185, 706. 59          128, 962. 91

Total expended...........----------------..       357, 742. 14   158, 919. 08    -    86., 447. 66     181, 624. 18          142, 413. 25

Allotted.........................                 516, 007. 08   198, 036. 82    -510, 891. 13         167, 440. 71        -123, 280. 59


Balance unexpended July 1, 1936----------------                                                                       $277, 576. 88
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936_________                                                                                              4,000.00

     Amount to be accounted for ___---------__-     _-_--------                                                           281, 576. 88
Deductions on account of revocation of allotment-------------                                                             127, 280. 59
      Net amount to be accounted for_                                                                                     154, 296.29
Gross amount expended---- ..          --   --------                                      $142, 713. 25
Less reimbursements collected-----------8-                                                     300. 00
                                                                                                                          142, 413.25

      Balance unexpended June 30, 1937___------------
Outstanding liabilities June 30, 1937
                                                                                               -                           11, 883. 04
                                                                                                                            9, 846. 97

     Balance available June 30, 1937-----------------                                                                       2, 036. 07
Amount allotted from War Department Civil Appropriation Act
approved June 19, 1937-----------------------        -----                                                               240, 000. 00

            Balance available for fiscal year 1938--------------- ----                                                    242,036. 07

Amount (estimated) required to be appropriated for completion
    of existing project 2__________________                                            --------                            76, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:                     -- -- -- -- --- - -- -- -- --- -- --- --
   For new work 2__________               - --- -- -- --- -- -- --- -- -- -- --- --
                                                                                                                           76, 000.00
   For maintenance 2- - - - - - - - - - -                                                                                 279, 000. 00
                          -- - ---- -         - --- - -
            Total                                                                                                         355, 000. 00
    2 Exclusive of available funds.

        21. REMOVING THE WATER HYACINTH, MOBILE RIVER, ALA.,
                            TRIBUTARIES

  Location.-The water hyacinth is a floating aquatic plant which
infests numerous fresh-water streams tributary to the South Atlantic
and Gulf coasts. It propagates from the seeds and suckers, spreads
quickly in most localities, and may cause entire suspension of naviga-
tion if not removed.
   Existing project.-This provides for the extermination or removal
of plants from the navigable waters of the States of Florida, Ala-
bama, Mississippi, Louisiana, and Texas, so far as they are or may
become an obstruction to navigation, by any mechanical, chemical, or
other means whatsoever; for the construction and operation of boats
equipped with suitable machinery for such removal; and for the con-
struction and operation of log booms to prevent the drifting of plants
from one stream to another.
   The estimated cost made in 1899 was $25,000 each for two boats,
$10,000 for operation in each district, and $1,000 for the establishment
          RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                         681
of booms. The latest (1928) approved estimate for annual cost of
maintenance is $4,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, made appropriations for the
States of Florida and Louisiana and provided for the extermination
or removal of plants, the building of boats, and the establishment of
booms (H. Doc. No. 91, 55th Cong., 3d sess.): act of June 13, 1902,
authorized the use of any mechanical, chemical, or other means what-
soever; act of March 3, 1905, made the appropriation available for
the State of Texas; acts of March 3, 1905, and March 2, 1907, in
making appropriations for Florida, provided that no chemical process
injurious to cattle which may feed upon the water hyacinth shall be
used; act of July 25, 1912, made the appropriation available for the
State of Mississippi, and also made available for use in that State
the operating plant pertaining to the work in Louisiana; and the act
of July 27, 1916, made the appropriation available for the State of
Alabama.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Operationswith United
States plant and hired labor were carried on in Three Mile Creek,
Dog River, Bayou Canot, and Mobile River, 645,500 square yards of
hyacinths being sprayed and removed, from July 1, 1936, to June 30,
1937. The total cost was $23,668.15, all for maintenance. The total
expenditures were $23,520.52.
   Condition at end of fiscal year.-The existing project is for main-
tenance. The total cost was $107,548.14, and the total expenditures
were $105,790.82.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $2,817.04 plus an allotment of $25,000, made during July
1937, will be applied to maintenance work as follows:
Accounts payable June 30, 1937---------------------------------    $1, 757.32
Spraying of water hyacinths and removal of water hyacinths and
  other aquatic growths by mechanical methods in Three Mile Creek,
Chickasaw Creek and tributaries, Bayou Sara, Dog        River,and
  other minor tributaries of Mobile River, by the operation of two
  United States spraying plants for a period of 12 months        _ 26, 059. 72
                                                             -____

      Total ----------------------------------------------------     27, 817. 04
  The additional sum of $25,000 can be profitably expended during
the fiscal year 1939 in the maintenance operation of two spraying
plants on the spraying and removal of hyacinths and other aquatic
growths by mechanical methods in the tributaries of Mobile
River, Ala.
                         Cost and financial summary
Cost of new work to June 30, 1937___--
                                   ------------------------------
Cost of maintenance to June 30, 1937--_--_---------    ___    $107, 548.14
     Total cost of permanent work to June 30, 1937--------------    107, 548 14
Minus accounts payable June 30, 1937                                    , 757. 3
                                                                      1------------------------
     Net total expenditures -----------------------------------     105, 790. 92
Unexpended balance June 30, 1937------------------------------        2, 817. 04
      Total amount appropriated to June 30, 1937 ----------------   108, 607. 86
682           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30             1933          1934           1935           1936              1937

Cost of new work---_.        -        -   --------------
Cost of maintenance        .-------------------
                                              $9,550.18     $9, 451.59    $13, 973. 20   $26, 091.96       $23, 668. 15
Total expended-....-----------------------    8, 341. 79     9,638. 20     12, 367. 54    26, 780. 43       23, 520. 52
Allotted.........-------------------------.   14, 000. 00    9, 268. 26    31, 000. 00    25, 000. 00         -560. 40


Balance unexpended July 1, 1936_.-..-..--..---. -----     $26, 897.96
Amount allotted from War Department Appropriation Act ap-
proved Apr. 9, 1935 ---         -------      .             1, 000.00

      Amount to be accounted for .--------------                          -----      --------           27, 897. 96
Deductions on account of revocation of allotment                                                           , 560. 40
                                                                                                        1 1-----...-----

      Net amount to be accounted for      --------------                                                26, 337. 56
Gross amount expended       ------------------------------------                                        23, 520. 52
      Balance unexpended June 30, 1937- -                        -------------                           2, 817. 04
Outstanding liabilities June 30, 1937--                        ------------------------                  1, 757. 32
     Balance available June 30, 1937--..----------------------                                             , 059. 72
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--------.. ----------------------------                                            25, 000. 00
          Balance available for fiscal year 1938 --------------                                         26, 059. 72
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1' - - - - -_ - - - - - - -- - - - - - - - - -                               25, 000. 00
   1 Exclusive of available funds.

                               22. CHICKASAW CREEK, ALA.

  Location.-Chickasaw Creek is a small waterway, about 40 miles
in length, entering Mobile River about 5 miles above the mouth.
    Existing project.--This provides for improvement by snagging
and by dredging a channel 18 feet deep and 150 feet wide from the
mouth to Chickasaw slips, about 21/s miles above the mouth.
   The estimate of cost of new work, made in 1933, was $42,000,
with $3,000 annually for maintenance. The existing project was
authorized May 28, 1935, under the Emergency Relief Appropria-
tion Act of 1935, and adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. No. 47, 73d Cong., 1st sess.). The project
document contains the latest published map.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The Tennessee Coal, Iron & Railroad Co.
owns a terminal about 2 miles above the mouth.
   Operations and results during fiscal year.-The U. S. derrick boat
J. M. Pratt, from January 5-14, 1937, removed 373 snags. The
costs were $1,500, for maintenance. The expenditures were $1,500.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935, at a saving of $758 under the estimated cost. The
controlling depth at the end of the fiscal year was 18 feet.
                       RIVERS AND HARBORS--MOBILE, ALA., DISTRICT                                                                                       683
  The total costs and expenditures on the existing project to June
30, 1937, were as follows:

                                                                                                       Costs
                                                                                                                                                Expendi-
                                                                                                                                                 tures
                                                                                 New work         Maintenance                Total

Regular funds...--                        ..----------.----          -----------------                     $1, 500           $1,500.00               $1, 600.   00
Emergency relief funds----------------------.........................             $41, 241. 64          ,--500-----          41, 241. 64             41, 241. 64

         Total---------------__________----------41, 241. 64                                                1,   500         42,741.64               42, 741. 64


   Proposed operations.-An allotment of $5,000 made during July
1937 will be applied to the operation of a United States derrick boat
on maintenance dredging and snagging for a period of about 11/4
months during the fall of 1937, in the restoration of project dimen-
sions in the channel at the mouth of this waterway.
   The additional sum of $10,000 can be profitably expended for
maintenance during the fiscal year 1939 in the operation of a United
States hydraulic pipe-line dredge for a period of about one-fourth
month when necessary, in the restoration of project dimensions in
this channel, at a cost of about $5,000, and in the operation of U. S.
derrick boat J. M. Pratt about 1 month on maintenance snagging
operations in this waterway at a cost of about $5,000, when necessary.
                                                       Cost and financial summary

Cost of new work to June 30, 1937  -------------------------- 1 $41, 241.64
Cost of maintenance to June 30, 1937------    -----------         1, 500. 00
      Total cost of permanent work to June 30, 1937------------- 42, 741. 64
Net total expenditures------------------------------------        42, 741. 64
Total amount appropriated to June 30, 1937--------------------42,     741.64

             Fiscal year ending June 30                                     1933                1934             1935                1936             1937

Cost of new work--------------------------------------------------                                                             $41, 241. 64 ......
Cost of maintenance----                        --                       ..
                                                              __-_.- _-----          --------                               ---
                                                                                                       -----.....................-     ,             $1, 500. 00
Total expended.....--                 .-----------------         -----------             ----------------------- 41,241.64                            1, 500.00
Allotted---------------------------------...................................--        ------------         $42, 000.00               -758.36          1, 500.00


Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-------------    ----------------------                                                                                   $1, 500. 00
Gross amount expended---------- ------ --------- ------------                                                                                  1,500. 00
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937---------------------------------                                                                                       5, 000. 00
Amount available for fiscal year 1938---------------- -- ------                                                                                5, 000. 00

Amount that can be profitably expended in fiscal year ending June
                            2- - - - - - - - - - - - - - - - -- - - -- - - -- - - - -
  30, 1939, for maintenance                                                           -                                                        10, 000.00
     1 Emergency relief funds.
     2 Exclusive of available funds.
684     REPORT OF CBIEF OF ENGINEERS, U. S. ARMY, 1937

                     23. ALABAMA RIVER, ALA.

   Location.-This river is formed 18 miles above Montgomery, Ala.,
by the junction of the Coosa and Tallapoosa Rivers. From this
junction'it flows in a southwesterly direction through the State of
Alabama for a distance of 320 miles, and unites about 45 miles north
of the city of Mobile, in the southwestern part of the State, with the
Tombigbee River to form the Mobile River. (See U. S. Geological
Survey charts for central and southwest Alabama.)
   Previous projects.-Adopted by River and Harbor Acts of June
18, 1878, and July 13, 1892. The total cost and expenditures were
$419,445.69, of which $400,420.57 was for new work and $19,025.12 for
maintenance. Work under existing project was begun in 1905. For
further details see page 1837, Annual Report for 1915.
   Existing project.-This provides for securing a channel by open-
channel work not less than 4 feet deep at low water from the mouth
to Wetumpka, Ala., a distance of 331 miles. Under this project
dredging and construction works were required at various obstruct-
ing shoals, usually consisting of gravel bars distributed over the
entire length of the river. The variation between average high and
low water is 40.4 feet. The extreme variation is 58 feet at Mont-
gomery.
   The estimate of cost for new work, revised in 1928, is $1,155,000,
exclusive of amount expended on previous projects. The latest
 (1928) approved estimate of annual cost of maintenance is $75,000.
   The'existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the channel from
the mouth to Montgomery (H. Doc. No. 378, 59th Cong., 1st sess.);
the act of June 25, 1910, provided for the channel from Montgomery
to Wetumpka (H. Doc. No. 1089, 60th Cong., 2d sess.). The latest
published map of Alabama River will be found in the Annual Report
for 1913, page 2124.
   Terminal facilities.-On the east bank at Montgomery there is a
natural landing connecting with the city streets and accessible to the
Louisville & Nashville Railroad. The Wofford Oil Co. has a small
wharf about 10 miles below Montgomery equipped for handling
petroleum products. A wharf is needed at Montgomery and at
Selma, Ala.
   The various natural landings along the river appear to serve
present purposes.
   Operations and results during fiscal year.-The U. S. snag boat
R. C. McCalla, from July 1, 1936 to June 30, 1937, removed 258 ob-
structions from the channel and 1,617 overhanging trees from the
banks; on August 20, and from October 13 to December 8, 1936, and
June 1-12, 1937, dredged 15,412 cubic yards of material. The R. C.
McCalla and quarterboat No. 4 from September 1 to November 8,
1936, placed 1,050 tons of rock at Gardners Island, and 1,500 tons of
rock at Washington bar, and 963 tons of rock at Cox bar.
   The cost was $36,899.74 for maintenance. The expenditures were
 $39,405.90.
   Condition at end of fiscal year.-The existing project is 62 percent
complete. The channel depth has been improved at the shallowest
bars and shoals between the mouth of the river and Montgomery,
Ala., by dredging and contraction works; between Montgomery, Ala.,
                 RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                                  685
and Wetumpka, Ala., the work has consisted of removing snags.
The controlling depths at end of fiscal year were as follows: Mouth
to Selma 4 feet, Selma to Montgomery 3.5 feet, Montgomery to
Wetumpka, 3 feet. Boats drawing 3 feet or less can usually operate
throughout the year. Gages are established at Montgomery, Selma,
Coy, and Claiborne, the reading on the two first-named gages for
extreme low water being 3 feet. The work remaining to be done to
complete the project from Montgomery, Ala., to mouth is the con-
struction of approximately 800 linear feet of spur dikes. The com-
pletion of that portion of the project from Montgomery to We-
tumpka, Ala., is not contemplated at the present time due to the
absence of all commerce on that section of the river. At the end
of the fiscal year the channel was in fair condition only; numerous
dikes were badly in need of repair.
   The total costs and expenditures for the existing project to June
30, 1937, were as follows:

                                                                              SCosts
                                                                                                                      Expendi-
                                                                                                                       tures
            ,:                                            New work        Maintenance                Total

Iegular funds        ----------------------- --$576, 605. 27              $1, 851, 109. 66       $2, 427, 714. 93   $2, 425, 460.69
Public Works funds--._    __.____--        .    139, 989. 87              -----
                                                                              -. - -         .       139, 989. 87       139, 989. 87

      Total..      ....---------- ..--------------..---
                                              .. .         716, 595. 14    1, 851, 109. 66        2, 567, 704. 80    2, 565,450. 56


   Proposed operations.-The balance unexpended including accounts
receivable at the end of the fiscal year, $2,414.38, together with an
allotment of $50,000 made during July 1937, will be applied as
follows:
Accounts payable--------------------------------------------       $2, 414. 38
Maintenance (with United States plant and hired labor) :
    Channel work:
        Repair and renewal of' contraction works between
          mile 302 and the mouth, with U. S. snag boat
          R. C. McCalla and attendant plant, 2 months (Sep-
          tember-October 1937, inclusive) _____________ $31, 000
        Snagging, between mile 302 and the mouth with
          U. S. snag boat R. C. McCalla, 3 months (Au-
          gust 1937, and May-June 1938, inclusive)-------- 13, 500
        Dredging, between mile 302 and the mouth with
          U. S. snag boat R. C. McCalla, 1 month (No-
          vember 1937) ----------------------------------   4, 500
        Routine examinations to determine available depths_  1,000
                      maintenance___________
                TotalTotalmaintnanc-----------------------------------
                                                    _________                                                       50,000.
                                                                                                                    50,     00
                                                                                                                        000.00

                Grand total------------------------ ------------------ 52, 414. 38
  The additional sum of $75,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance (with United States plant and hired labor):
    Repairs and renewal of contraction works between mile 302 and
      the mouth_-----------------------------------------------       $56, 000
    Snagging between mile 302 and the mouth------------____________    13, 500
    Dredging between mile 302 and the mouth----------__            --   4, 500
    Routine examinations to determine available depths_-      ----      1,000

         Total ------------------------------------------------                                                       -75,000
686                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                Cost and financial summary

Cost of new work to June 30, 7937------__________
                                             -___-1                 $1,117, 015.71
Cost of maintenance to June 30, 1937-----------------------          1,870, 134. 78
      Total cost of permanent work to June 30, 1937----------2, 987,150. 49
Plus accounts receivable June 30, 1937-------------------                    16. 14
      Gross total costs to June 30, 1937 ______---_____              2, 987, 310. 63
Minus accounts payable June 30, 1937------------------------              2, 414. 38
      Net total expenditures-----2,                                     984, 896.25
Unexpended balance June 30, 1937-__-______----             -      -       2,254.24
      Total amount appropriated to June 30, 1937             .---    2, 987,150.49        --------
     Fiscal year ending June 30                    1933            1934            1935             1936               1937


Cost of new work_----.    -_-____ $58, 823. 67 $125, 950. 46                     $14, 989. 00   ...........-.     --.-.--......
Cost of maintenance--              54, 479. 56
                       --------.............     29, 387. 74                      40, 178. 05      $50, 176. 04       $36, 899. 74
        Total cost.           ...------------    113, 303. 23   155, 338. 20      55, 167. 05      50, 176. 04         36, 899.74

                    ----- 234. 380. 04 -17, 510. 93
Total expended..................----                                           -319, 922.59        51, 914. 96         39,405. 90
Allotted-----...-----------                      279, 731.
                                                         44     -10, 386. 66   -336, 178. 25       14,992.85            4, 982. 09


Balance unexpended July 1, 1936---- ------------------------                                                      $36, 678. 05
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936   ..------------------------------------                                                     12, 000.00
      Amount to be accounted for --------    ___ --         -------                                    _           48, 678. 05
Deductions on account of revocation of allotment ------------                                                       7, 017.91
      Net amount to be accounted for------------------------                                                       41, 660.14
Gross amount expended_------------------------        $39, 961. 81
Less reimbursements collected---------          -----      555. 91
                                                                                                                   39, 405.90
      Balance unexpended June 30, 1937----------- -----------                                                       2, 254.24
                                   ---
Outstanding liabilities June 30, 1937              __  ______----__                                                 2, 414. 38
      Balance available June 30, 1937-----------------                                                              -- 160. 14
Accounts receivable June 30, 1937_____________                                                                         160.14
Amount allotted during July 1937 -----------                                         ------                        50, 000. 00
Balance available for fiscal year 1938 --__                               __-----------------50, 000.00
Amount (estimated) required to be appropriated for completion
of existing project 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                  438, 400. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 2- - - - - - - - - - - - - - - - - - - - - - -                               -
                                                                                                                   75, 000. 00
1 Includes $139,989.87 Public Works funds.
   2 Exclusive of available funds.

                                    24. COOSA RIVER, GA. AND ALA.

  Location.-The Coosa River is formed at Rome, Ga., in the north-
west part of the State of Georgia, by the junction of the Oostanaula
and Etowah Rivers, which have their sources in northern Georgia.
From Rome the Coosa River flows in a southwesterly direction
through Georgia and Alabama for a distance of 286 miles and unites;
with the Tallapoosa River to form the Alabama River near Mont-
gomery, Ala., at about the center of the State. (See U. S. Geological
Survey charts for northeast Alabama and northwest Georgia.)
  Previous projects.-The River and Harbor Act of August 14, 1876,
adopted the original project, which was modified by the River and
Harbor Act of September 19, 1890; the total cost and expenditures
were $966,806.38 for new work. Work under the existing project
                RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                         687

was begun in 1877. For further details of previous projects see page
1837 of Annual Report for 1915.
   Existing project.-This provides for securing from dam no. 5,
Alabama, to Rome, Ga., a channel 4 feet deep at extreme low water
and 100 feet wide, to be obtained by open-channel work and the
construction of locks and dams, 1 dam without a lock and 4 locks
and dams located between a point 7 miles below Riverside, Ala., and
Greensport, Ala., and 1 lock and dam located at Mayos Bar, 7.5
miles below Rome, Ga. The length of the section included in the
project is 165.5 miles, the lower end being 117 miles above the mouth
of the river. The project also provides for operating and care of
all locks and dams. Certain data relative to the Coosa River dams
are given in the following table:

                                                                                                  Available depth
                                                                   Dimensions of locks            over miter sills
                                                    Miles                                          at low water
Locks and        Location with reference           from
     dams             to nearest town              mouth
                                                   of river   Greatest
                                                              available   width           Lift    Upper        Lower
                                                               length


                                                              Feet     Feet    Feet      Feet                    Feet
Lock 31 (15).. Wetumpka, Ala........-----------         11      280        52   14. 70     8. 00                    8. 00
Dam 5....... Gadsden, Ala., 58 miles                                            10. 00
                                                       117 ...................----------
No. 4-........Gadsden, Ala., 48 miles       -.         127      280        52    8. 00     7.00                     7.00
No. 3-....... Gadsden, Ala., 27 miles ..    ,          148      176        40   12. 00     5. 15                    4. 00
No. 2.........Gadsden, Ala., 251 miles_                1491     176        40    5. 57     5. 40                    5. 20
               Gadsden, Ala., 22% miles-
No. 1---.........                                      152      176        40    5. 33     3. 41                    3. 25
Mayos bar...   Rome, Ga., 73 miles......               275      176        40   12. 00     6. 00                    5. 00


                                                                                        Year Year of
  Locks and            Character of               Kind of           fconstructio        pened cmpl-            Cost
    dams               foundation                  dam        Type of construction    tonav- comple-           Cost
                                                                                      igation   ion

Lock 31 (15)_. Gneiss .--         __-                ...--_         __ ..
                                                                   ..
                                                                __....-------.-------.....   (1) 2$228,511.00
Dam 5-........Disintegrated chert and            Fixed._.                       .-------
                                                            Concrete and cribs---   ....... 191-7 397, 834. 00
              limestone.
No. 4--------.........
            ....do--....                       do-----.....Dry rubble masonry..
                                           ...---                                          1914    (3)    2   456, 620.00
No. 3-           Disintegrated chert ....-. do- do.....----- do      ---.....--------..    1890   1890        110, 744.47
No. 2-......     Sandstone and slate-.....- do-.....   ....- do ...-----------------       1890   1890        159, 166.00
No. 1-....-.     Sandstone__...............-.do-----     Rock-filled cribs----......       1890   1890        106,173.96
Mayos bar....    Compact shale........----------do...   Dry rubble masonry..-              1913   1915        279, 929. 29

1 50 percent complete.
2 Estimated cost; no exact record.
a Lock is 99 percent oomplete, and the dam completed.

   The fluctuations of stage are as follows: Rome, Ga., ordinary, 30
feet; extreme, 40 feet. Gadsden, Ala., ordinary, 22 feet; extreme, 38
feet. Lock no, 4, about 4 miles above Riverside, Ala., ordinary, 17
feet; extreme, 24 feet. Wetumpka, Ala., ordinary, 45 feet; extreme,
62 feet.
   The estimate of cost of new work, revised in 1928, is $1,835,000, ex-
clusive of amounts expended on previous projects. The latest
 (1928) approved estimate of annual cost of maintenance is $10,000
for the part of the river between Rome, Ga., and Gadsden, Ala. The
estimate of annual cost of operation and care of locks and dams,
made in 1937, is $3,600.
   The existing project was authorized by the following river and
harbor acts: The act of August 14, 1876, provided for open-channel
         20196-37-pt. 1-            44
688      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

work and locks and dams nos. 1, 2, and 3 for that section of the river
between the Selma, Rome & Dalton Railroad bridge near Wilsonville,
Ala., and Rome, Ga., at an estimated cost of $470.668 for work be-
tween said bridge and Greensport, Ala. (see Annual Report for 1872,
p. 536), and $180,000 for work between Gadsden and Rome, a distance
of 107.5 miles (see Annual Report for 1875, pt. 2, p. 661) ; the acts of
September 19, 1890, and July 13, 1892, provided for the present chan-
nel dimensions, viz, 4 feet deep and 100 feet wide, the increase of lock
dimensions to 52 feet width and 280 feet clear length, and for the im-
provement of the entire river from Wetumpka, Ala., a distance of 11
miles above the mouth, to Rome, Ga. (H. Doc. No. 94, 51st Cong., 1st
sess.). Only the walls of lock no. 31 and dam no. 4 were constructed
under this enlarged project, which has been considered as definitely
abandoned following report of January 9, 1905 (H. Doc. No. 219,
58th Cong., 3d sess.). The act of June 25, 1910, provided for dam no.
5 and the lock in dam no. 4 (H. Doc. No. 1421, 60th Cong., 2d sess.),
and for the lock and dam at Mayos Bar (H. Doc. No. 1115, 60th
Cong., 2d sess.). Operation and care of locks and dams were in-
cluded in the project July 1, 1935, under the provisions of the Perma-
nent Appropriations Repeal Act, approved June 26, 1934.
   The latest published maps of the Coosa River will be found in the
Annual Report for 1890, page 1644, for that portion of the river from
lock no. 4 to Greensport; Annual Report for 1891, page 1752, for that
portion between Wetumpka and lock no. 4; and Annual Report for
1913, page 2125, for the upper Coosa.
   Recommended modifications of project.-The abandonment for the
present of the existing project, except for the inexpensive care. and
maintenance of locks and dams, was recommended under date of De-
cember 29, 1920 (H. Doc. No. 1018, 66th Cong., 3d sess.).
   Terminal facilities.-At . Rome, Ga., there is one small private
wharf on the left bank of Oostanaula River, very little used, and a
private wharf on the left bank of Etowah River used exclusively
by the owners. At Gadsden, Ala., there are no terminal facilities.
   Operations and results during fiscal year.-All locks were kept in
operation during the year. The total cost was $3,194.66 for mainte-
nance. The total expenditures were $2,499.64.
   Condition at end of fiscal year.-The existing project is 83.5 per-
cent completed. Locks and dams nos. 1, 2, and 3, the lock and dam
at Mayos Bar, and dam no. 5 have been completed. .Lock no. 4 was
completed, except about 1 percent of work required on the lock, which
consists of the completion of the backfill and completion of upper
guard wall. (See tabulated statement under "Existing project.")
Open-channel work by dredging, rock removal, and construction of
contraction works had been carried on at various shoals between lock
no. 4, Alabama, and Rome, Ga. A 4-foot depth at mean low water
obtains at such bars as had been worked over, but no extensive and
consecutive length of stream had been completed. At the end of the
fiscal year the controlling depth was 21/2 feet on several of the bars;
from Gadsden, Ala., to Woods Ferry, a distance of 37 miles, the con-
trolling depth was 3 feet, certain shoals and the lower sill at lock
no. 1 being the controlling points; from Woods Ferry to lock no. 4,
a distance of 9 miles, the controlling depth was 4 feet. These depths
are obtainable throughout the year. Increased drafts are ordinarily
obtained between the months of January and June, inclusive. The
                 RIVERS AND HARBORS-MOBILE,                                     ALA., DISTRICT                       689

work remaining to be done to complete the project consists of a lock
at dam no. 5 and lowering sills at lock no. 1 and completing open-
channel work from Mayos Bar to lock no. 4, a distance of 148 miles.
All locks and dams are in fair condition so far as completed, except
locks nos. 1, 2, 3, and dam no. 5. At lock no. 1 the miter sills are
badly worn and are in need of replacement to permit successful oper-
ations of the lock. The wooden gates at locks nos. 2 and 3 are de-
cayed and leak badly. At dam no. 5 there are two breaks aggregat-
ing a total length of approximately 225 feet. Repairs are not con-
templated at any of these. Open-channel work which has been done
has. in general, been maintained by the action of the river.
   The total cost under the existing project was $2,333,515.17, of
which $1,608,105.59 was for new work and $725,409.58 for mainte-
nance. The total expenditures were $1,774,138.41. In addition the
sum of $559,145.99 was expended between June 30, 1890, and June 30,
1935, on the operation and care on the works of improvement under
the provision of the permanent indefinite appropriation for such
purposes.
    Proposed operatio.s.-The balance unexpended at the end of the
fiscal year, $345.59, together with an allotment of $3,500 made during
July 1937, will be applied as follows:
Accounts payable-------------------------------      -------------- $230. 77
Maintenance :
    Operation of 5 locks and 1 dam---------------------$3, 200. 00
    Ordinary repairs ------------------------------------    414. 82

         Total maintenance-----------------------------------------                                             3, 614. 82
         Grand total----------------------------------                                                          3, 845. 59

   The additional sum of $7,000 can be profitably expended during the
fiscal year 1939 as follows:
Maintenance :
   Stream gaging----------------------------------------------3, 000.00
   Operation of locks and dams ---------------------------------- 3, 200. 00
   Ordinary repairs----------------------------------------------800. 00

          Total ----------------------------------------------                                                  7, 00. 00

                                           Cost and financial summary

Cost of new work to June 30, 1937-------------------------- $2, 574, 911.97
Cost of maintenance to June 30, 1937---------------------------    725. 409. 58
      Total cost of permanent work to June 30, 1937---------- 3, 300, 321. 55
Minus accounts payable June 30, 1937-------------------------           230. 77
      Net total expenditures----------------------------- --    3, 303, 090. 78
Unexpended balance June 30, 1937 -----------------------------           45. 59
      Total amount appropriated to June 30, 1937-------------- 3, 300, 436..37

         Fiscal year ending June 30                       1933          1934          1935           1936          1937


Cost of new work__      _ _ _ _ __ -
                ...............---                                                   --- - --- -- -- - --- -- - ---
Cost of maintenance_-----------------. $9, 922. 06                    $9, 881.10    $6, 617. 71   $3, 390. 52     $3, 194. 66

Total expended---.....       --.....--....-.          - 10, 730. 21    9, 986. 38    6, 095. 22     1,396. 19      2. 499. 64
Allotted-    - --...................   -    . --. .     10, 728. 66   10, 925. 71    9, 520. 38   -1, 232. 03    -1, 300. 00

  1 Includes     $559,145.90 under permanent indefinite appropriation for operation and care.
690          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 -------------------------                         $4, 145.23
Deductions on account of revocation of allotment -------                           1, 300. 00
                                                                                   1-----

      Net amount to be accounted for_ --------------                                 2, 845. 23
Gross amount expended __--------------------                  $3, 231.64
Less reimbursements collected                                      32.00
                                                                  7----------------------
                                                                                     2, 499. 64
      Balance unexpended June 30, 1937---- __----              -345.                       59
Outstanding liabilities June 30, 1937---------------------------                      230. 77

     Balance available June 30, 1937 -----------------      --                        114.82
Amount allotted during July 1937 --
                                 __------------------------                        3, 500. 00

         Balance available for fiscal year 1938____---------3,                        614. 82

Amount (estimated) required to be appropriated for completion
  of existing project       __        ----------         --         -           227, 000. 00
Amount that can be profitably expended- -in             year ending
June 30, 1939, for maintenance 2
                                          - ---fiscal
                                                - - - ---------                    7, 000. 00
  2   Exclusive of available funds.

  25. BLACK WARRIOR, WARRIOR, AND TOMBIGBEE RIVERS, ALA.

   Location.-The above names apply to what is virtually a single
stream having its source in northern Alabama, flowing in a general
southwesterly direction, and uniting with the Alabama River to form
the Mobile River, 45 miles above Mobile Bay. (See U. S. Geological
Survey map of Alabama.)
   Previous projects.-The original project for the improvement of
Warrior River, now combined with the Black Warrior and Tom-
bigbee Rivers, was adopted by Act of March 3, 1875. The total cost
and expenditure of previous projects prior to adoption in 1884 of
the existing project was $656,930.78, of which $606,930.78 was for
new work and $50,000 for maintenance. For further details, see
page 1841 of Annual Report for 1915.
   Existing project.-This provides for the construction of 15 dams
and 16 locks, the extra lock being at dam no. 17, where the lift of
61 feet is equally divided between 2 locks in tandem, and for such
dredging and clearing of channels by snagging as may be necessary:
to secure an all-year channel 9 feet in depth and 200 feet wide,
where practicable, from the mouth of the Tombigbee River 45 miles
above Mobile, to mile 457 on the Sipsey Fork, mile 454 on the Mul-
berry Fork, and mile 430 on the Locust Fork, a total distance of 436
miles. The project also provides for dredging a cut-off channel 9
feet deep and 150 feet wide approximately 1.4 miles long in the
vicinity of Sunflower Bend, and installing temporary flashboards on
dams 1-9, raising existing dams 13-16 each 1 foot, the construction
of crest gates 12 feet high on dam 17, and the maintenance of Mobile
River from the mouth of Chickasaw Creek to the junction of the
Alabama and Tombigbee Rivers, a distance of 42 miles. Existing
locks and dam nos. 10, 11, and 12 are to be replaced by a new lock
and dam to be constructed in the vicinity of Tuscaloosa.
   The maintenance of the section of the Tombigbee River below lock
no. 1 to its mouth, a distance of 66 miles, formerly reported under
the title "Tombigbee River, Ala., from mouth to Demopolis (main-
tenance of channel)", authorized by the River and Harbor Acts
approved September 19, 1890, and June 13, 1902, is included in this
                     RIVERS AND HARBORS--MOBILE,                                                ALA., DISTRICT                                 691
project. The last separate report under the above-quoted title is
shown on page 781, Annual Report for 1926.
   The project also provides for operating and care of all locks and
dams.
   The following statement shows condition of locks and dams, all of
which (excepting the Tuscaloosa) have been open for through traffic
since May 1915:
                     Location and other data for locks and dams in this system

                                                                                                                                              Depth
                        Dis-                                                             Width of chamber and                                  over
    Lock no.           above                Nearest town                     tance        greatest length available                Lift       sills at
                          Stance                                                          for the full width (feet)                             low
                                                                                                                                              water


                           Miles                                                Miles                                                Feet      Feet
1..............66                 St. Stephens, Ala-......                         - 3      21. 9 by 52................               9. 00      1 8. 0
2__-....-....              137    Pennington, Ala .........                            6 286 by 52-------------                      12. 00        8. 5
3------------              159    Oakchia, Ala-----------                              5 -       do------------                      10. 00        8.5
4------------              186    Demopolis, Ala-...........                           1    285.6 by 52..-------------              10. 00        8.5
5----------............    201    Cedarville, Ala---------..........--                 5 ..... do----                                10. 00       8.5
6--------.. ..          - 221. 5  Sawyerville, Ala........------..---                  5 --.... do----                               10. 00        8.5
7--.--._--.-               237    Wedgeworth, Ala..-.-.                .               5 284.7 by 52._                               10. 00        8. 5
8.-----------253                  Akron, Ala............----------------               3 284.7 by 51.65.------------                 10. 00        8.5
9--_---_"_-                270    Powers, Ala..-------------                           4 284. 7 by 52----...-.....                   10. 00        8. 5
Tuscaloosa.... 315.75             Tuscaloosa, Ala.------..                    .----.        95 by 460 __----------------(4)                      10.0
10 --------               317       -do--- ---------                     -------           286.6 by 52......------             -      9.86         8. 5
11 _---___--317.5 -                    do      --            --------------                 286by 52----------------                  8.50         8.5
12 -----                   318        do.--           -----------                      1 286.2 by 52......---------- 10.50                         8.5
13...-.-.-..-.             325    Tidewater, Ala..-----....                       ---      285.5 by 52_. _-_            ..      -12.     14        8. 5
14............. 328. 5            Searles, Ala_-------------                           8 282.1 by 52.. ...--                  .- 14. 00            8. 5
15-------                - 335    Kellerman, Ala_                         .-----            .--- do----------------                  14. 00        8.
16_-- --- - - - - - -. 341.5 -        dd.o.. -...............                         14 285.5 b y 52. . -              - - - 21.00                8.5
17 ----------...........   343   .... do....-------------------                       14 ..      do.                       --        61. 00        8.5

                                                                                                  Total lift..----...._           242.00


                                                              Type of construction                  Date                              Actual cost
         Lock no.
               Character of                 Kind of                                               o             Date opened           of lock and
                    foundation               dam                                                  of corn-     to navigation              dam
                                                              Lock                D m             pletion


1........      Soft rock---------.......... Fixed__        Concrete.                   Concrete-.....           1909 Sept. 6,1908       $560, 290. 02
2........      Hard clay...........__do-...                __do ....                   Timber crib,             1915 Nov. 1, 1914        560, 114.09
                                                                                          stone filled.
3........-------.. do__ ....                    ___do .....          do .......              do .        ..     1915 Sept. 21, 1914      609, 622. 80
4             __........---...--do...------------    do......do            _..               do_     _          1908 Dec. 1, 1908        479, 000. 00
5-------........---.. do------------do.....                          do-- .--. ---... do -------.               1908 Sept. 1,1908        501,000. 00
6........         Piles .                      ___---do ....         do ...--         ...--- do     ....--. 1908     Oct.     1, 1908    443, 000. 00
7-           --............
                          do ......                  do            .do     ........------- do                   1903 Nov. 7, 1903        225, 600. 00
8_......... __ _ d                ...                 o         ..
                                                               _do........                   do .     ..        1903 Jan.     1,1903     212, 400. 00
9----------do                  ------------          do-       --_do--------_do__-------- 1902                            d---____--     202,440.00
Tusca-            Hard blue shale-___ .. do .. _ _ do-.....Concrete.-------_..------------------                                      63,798,319.71
   loosa.
10  2___...__     Hard sandstone-.. do_                            Stone ...           Timber crib,             1895 July 1,1896         244, 500.00
                                                                                         stone filled
11 -.........--           do- ----------- do-..... do ....                                   (do--------.1895 -           do-------      170, 000. 00
12          .--------     do------------do-                          do.--------do-------- 1895 ----- do--------                         160, 500.00
13_---- ..... do------__                     ---- - do       -____do .. __ Stone---------1905                        July 4, 1905        203,700.00
14__...-......do-..._.._......                       do___ Concrete. Concrete-.....                             1910 Mar. 29, 1910       414, 714. 89
15 .....____.. do ...-.                     .. __do .. -             do .... ..... do......                _ 1910    May 2,1910          430, 233.87
16-..__         .. ___do_              -____do                _ do--                     -do          -         1915 Jan.     1,1915     520,853.68
17 a .__.------do-.-----------.                      do -_.--do -.-------                    do-....        .191 5 1 May 13,1915 7 3,174, 070.00

   1 River is tidal below this lock and daily gage readings show that on an average of only 2 days per year
is the depth over the sill less than 8 feet, the minimum being 6.9 feet.
   2 Locks nos. 10, 11, and 12 will be replaced by Tuscaloosa lock and dam.
   3 Double lock.
   4 31 feet.
   5 Now 99 percent completed; the remaining 1 percent covers cost of submerged land.

   6 Estimated.
   " Estimated cost. Payments for submerged lands not completed. Cost to Jan. 1, 1932, $3,138,630.58.
692     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The tidal influence extends from Mobile 111 miles to lock no. 1,
where the tidal effect is apparent only at low stages of river. At
Mobile the mean and extreme tidal ranges are 1.4 and 3.6 feet, re-
spectively. These are at times slightly increased by the effect of
winds. The greatest fluctuation of river stages is at Demopolis,
Ala., the maximum at this point being 59.7 feet. The maximum
fluctuations at other points are 40 feet at lock no. 1, 111 miles from
Mobile; 57.8 feet at Tuscaloosa, Ala., 362 miles from Mobile; 25
feet at Birmingport, 419 miles from Mobile; and 39.3 feet at Cor-
dova, 439 miles from Mobile. The ordinary fluctuations at these
points are at lock no. 1, 20 feet; at Demonolis, 35 feet; at Tuscaloosa,
40 feet; at Birmingport, 10 feet; and at Cordova, 15 feet. The works
of improvement have reduced the amount of fluctuations at different
points from 3 to 10 feet.
   The estimated cost of new work, revised in 1937, is $15,400.000,
exclusive of amounts expended on previous projects. The latest
 (1936) annroved estimate for annural cost of maintenance is $574,000.
The 'existing project was authorized by the following river and
harbor acts:
   The original annronriation for the existing project was made by
act of July 5, 1884. The renort of a board of engineer officers rec-
ommending a proiect for slack-water navigation was approved by
the Secretary of War April 19, 1887. The act of March 3, 1899,
provided for the construction of the first locks between Tuscaloosa
and Demonolis: act of June 13, 1902, merged the individual proiects
for the Black Warrior, Warrior, and Tombigbee (below Demopolis) ;
and the act of August 22, 1911, authorized the extension to its final
limits (Annual Renorts for 1887, p. 1302; 1891. p. 1461: 1901, p. 1858;
and H. Does. No. 259. 54th Cong., 1st sess.; No. 178. 56th Cong., 2d
sess.; No. 72, 62d Cong.. 1st sess): the act of March 2, 1919, pro-
vided for the raising of various dams 2 feet and raising the lock
walls 2 feet at lock no. 1 to provide a minimum death of 8 feet at
low water; also for widening the channel to 150 feet where prac-
ticable (Annual Renort for 1918, n. 876). The act of August 20. 1935,
provided for snagging of Mobile River from the molth of Chick-
asaw Creek to the iunction of the Alabama and Tombigbee Rivers
 (H. Doc. No. 728. 71st Cong., 3d sess.); the extension of the proiect
to its present limits and channel dimensions (H. Doc. No. 56, 73d
Cong., 1st sess.); and the construction of a lock and dam below
T, scaloosa to replace existing locks and dams nos. 10, 11, and 12
(Rivers and Harbors Committee Doc. No. 26, 74th Cong., 1st sess.).
   Operation and care of locks and dams and appurtenant works
were included in the project Julyv 1, 1935, under the nrovisions of
the Permanent Appropriations Repeal Act, apnroved June 26, 1934.
   The latest puhlished map for tfhe Tombigbee River and tributaries
is published in House Document No. 56. Seventy-third Congress, first
session, for the Warrior River, Annual Report for 1911, page 1702,
and for the Black Warrior River, in Annual Report for 1913, page
2144.
   Local cooperation.-Fullv complied with.
   Trminal facilities.-Facilities,comprising loading and transfer
stations, wharves, etc., have been provided along this waterway. All
are privately owned and operated except the terminals at Tuscaloosa
and leased to a private company, but serve the general public, and
                     RIVERS AND HARBORS-                              MOBILE, ALA., DISTRICT                                   693
terminals at miles 367 and 419 are owned and operated by the
Inland Waterways Corporation and serve the general public. These
terminals are considered adequate for the present commerce.
   Operations and results during fiscal year-Regular funds-Op-
erating and care.-All 17 locks and dams, telephone line of 186 miles,
and other equipment and plants were operated and maintained by
United States plant and hired labor. The cost of this work was
$210,045.60, charged to maintenance.
  The following maintenance dredging was done:

                                                                                                                             Cubic
                        Plant                                   Locality                            Date                     yards
                                                                                                                           removed

U. S. pipe-line dredge Blackwater-.....                 Tombigbee River  _ July 1-18, 1936__....-----------                   129, 431
U. S. pipe-inesdredge ettu.s-,.------                   Warriorand Tombig- , July 1, 1936-June 30,.1937....                1, 293,.610
                                                          bee Rivers.
U.   S.   pipe-line dredge Pascagoula-...... Tombigbee River..... May 24-June 30, 1937.......-------- 756, 650
U.   S.   derrick boat Tallawampa-....... Warrior River-..-..                    July 1-8, 1936..............----------------    1, 650
U.   S.   snag boat Denison......        _    __-----do...........-------------. July 1, 1936-June 30, 1937..-..              1 49, 329
U.   S.   derrick boat Pearl___-__                    _-----do....-------------May 1-31, 1937.............--------------        (2)
U.   S.   snag boat Montgomery..........----------- Tombigbee River-...          July 1, 1936-June 30, 1937....                3 7, 053


1 Also 5,436 obstructions and 75 cords of drift.
S50 cords of drift.
3 Also 3,605 obstructions; 2,830 cords of drift and a sunken barge from Lock No. 1, upper approach.


   The U. S. snag boat Montgomery aided in raising of the sunken
launch President, the cost of which was defrayed by the Inland
Waterway Corporation. From July 1, 1936, to June 30, 1937, 834.27
acres of land to be submerged by backwater from crest gates on
dam no. 17, were cleared by Government plant and hired labor; from
December 4, 1936, to June 30, 1937, the contractor cleared 1,352.02
acres of land to be submerged by backwater from crest gates on dam
no. 17; the contractor continued construction of cofferdam, excava-
tion, fill and other work in connection with the Tuscaloosa Lock and

                                           ,certain
Dam, February 9, 1937, to June 30, 1937; orders of possession were
obtained for clearing          lands to be submerged and negotiations
were continued for settlement of damage claims caused by backwater
from crest gates on dam no. 17; all new work. The cost was
$813,823.27, of which $550,135.93 was for new work and $263,687.34
for maintenance. The total expenditures were $902,281.66.
   The total cost for the fiscal year, regular funds, was $1,023,868.87,
of which $550,135.93 was for new work and $473,732.94 for main-
tenance. The total expenditures were $902,281.66.
   Emergency relief funds.-The contractor, constructing crest gates
on dam no. 17, placed 3,879.03 cubic yards of class B concrete and
50,878 cubic yards of class A concrete, 2 330,559 pounds of struc-
tural steel and 110,565 pounds of reinforcing steel, and 3,022.51 linear
feet of dowel holes drilled July 1, 1936, to February 28, 1937. Bush
hammer finish was completed on 1,730.4 square yards; 1,170 linear
feet of cofferdam was placed and cofferdam removed down to old
dam crest in 22 bays, and 1,004.89 cubic yards of concrete excavated,
July 1, 1936, to January 31, 1937. Twenty-two gates and 22 spans
of girders were placed October 10 to December 31, 1936. Electrical
work and car bumper were completed May 31, 1937. The contractor,
reconstructing three trestles, placed false bents and I-beam spans
over piers 1 and 2 at bridges 17.3 and 17.5. False bents and steel
I-beam spans for bridge 16.6 were completed January 1-31, 1937.
694              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Abutments and cofferdams at bridge 17.3 were completed December
1-31, 1936;.926.42 cubic yards of common excavation and 319.35
cubic yards of rock excavation were removed from foundations;
1,915.95 cubic yards of class B concrete, and 200.58 cubic yards of
class A concrete, and 30,649 pounds of reinforcing steel were placed
in the piers and abutments of bridges 16.6, 17.3 and 17.5, and girder
spans were placed on these bridges October 1936, to June 30, 1937.
The contract on June 30, 1937, was 99 percent completed. The cost
was $502,546.71, all for new work, and the expenditures were
$452,972.46.
   The total cost for the fiscal year, all funds, was $1,526,415.58, of
which $1,052,682.64 was for new work and $473,732.94 for main-
tenance. The total expenditures were $1,355,254.12.
   Condition at end of fiscal year.-The existing project is about 72
percent completed. Seventeen locks and dams have been built (see
table under "Existing project"), the channel has been dredged, origi-
nal snagging completed and principal lock houses built at all locks.
A depth of 8. feet over a minimum width of 100 feet obtains through-
out the entire length of the improvement, and all-year navigation
for boats is possible to the extent of the channel dimensions. The
work remaining to be done consists of the work authorized by the
1935 River and Harbor Act. Of this authorized improvement con-
struction of crest gates on dam no. 17, Black Warrior River was
continued, and reconstruction of three trestles over Short Creek, a
tributary of Black Warrior River, was completed during the fiscal
year. Construction of Tuscaloosa Lock and Dam was commenced
during the fiscal year.
   The total costs and expenditures for the existing project to June 30,
1937, were as follows:

                                                                      Costs
                                                                                                              Expenditures

                                                 New work          Maintenance            Total

Regular funds_. .......................        $10,439, 064. 43   $9, 807, 819. 35   $20, 246,883. 78         $11,140, 033.14
Public Works funds--_____    ----------.            79, 219. 93 --------------             79, 219. 93             79, 219. 93
Emergency Relief funds---................          583, 810. 97                            5--------------
                                                                                          583, 810. 97            526, 369. 32

      Total ....................   _   .....    11, 102, 095. 33    9,807,819. 35     20,909, 914.68           11, 745, 622. 39



  In addition the sum of $8,932,686.64 was expended between July 1,
1896, and June 30, 1935, in the operation and care of the works of
improvement under the provision of the permanent indefinite ap-
propriation for such purposes.
  Proposed operations.-The balance unexpended, including accounts
receivable at the end of the fiscal year, $1,167,703.33, plus an allot-
ment of $2,120,000 made during July 1937, will be applied as follows:
Accounts payable---------------------------------------                                                      $175, 274. 78
New work :
    Payment for lands submerged by backwater
      above original dam no. 17, Black Warrior
      River---------------    ---------- -------- $12, 925. 32
    Continuing contract for constructing Tusca-
       loosa Lock and Dam___----------             1, 811,769. 73
      Complete payment on contract for clearing
       lands to be submerged by backwater from
        crest gates on dam no. 17----- ------------ 135, 139. 25
              RIVERS AND HARBORS--MOBILE, ALA., DISTRICT                                     695
New work-Continued.
   Clearing lands to be submerged by backwater
      from crest gates on dam no. 17 with Govern-
      ment plant and hired labor (July 1-Sept. 30,
      1937, inclusive)----------------------------                   $27, 447. 89
   Complete payment on contract for reconstruct-
      ing crest gates on dam no. 17---------------                     4, 100.00
   Preparation of abstracts and other title work
      in connection with dredging Sunflower Bend
      cut-off ------------------------------------                         568.58
    Payment for damages caused by backwater
      from crest gates on dam no. 17_-------------                  192, 160. 31
    Contract dredging cut-off channel in vicinity of
      Sunflower Bend, Tombigbee River----------                     335, 000. 00
    Hired labor, installing flashboards on dams
      nos. 1 to 9------------------------------                       60, 000. 00
    Hired labor, widening channel below lock no. 1
      by dredging ------------------------                            30, 000. 00
    Hired labor, raising existing dam no. 16 1 foot_                  40, 000. 00
      Total new work----              -----------------------------                $2, 649, 111. 08
Maintenance (with United States plant and hired
labor) :
    Operation of 17 locks and dams--------------$94, 000. 00
    Ordinary repairs_____-----              ___-----------            25, 820. 47
    Improvement and reconstruction _____------                        74, 000. 00
    Channel work :
        Dredging in river channel between mile 45
           and head of navigation with U. S. pipe-
           line dredge Pettus 8 months (July-Octo-
           ber 1937, inclusive, and March-June
           1938, inclusive), at $13,250 per month;
           U. S. pipe-line dredge Pascagoula 3
           months (July 1937 and May-June 1938),
           at $20,000 per month; and with U. S.
           snag boats Denison and Montgomery 3
           months each (December 1937 to Febru-
           ary 1938, inclusive), at $5,000 per snag
           boat per month-----_---------------                      196, 000. 00
        Snagging in channel between Chickasaw
           Creek and head of navigation with U. S.
           snag boats Denison and Montgomery,
           approximately 6 months each (July-
           September 1937, inclusive, and March-
           May 1938, inclusive), at $5,000 per snag
           boat per month ___________________                         61, 000. 00
        Routine examinations to determine avail-
           able depths and check yardage with
           U. S. towboat Ulkanush and survey
           party, 6 months (July-October 1937, in-
           clusive, and March-April 1938, inclu-
           sive),   at approximately                $1,750 per
           month -----------------------------                        10, 300. 00
    Stream gaging------------------------------                         2, 200. 00
      Total maintenance _______                                                        463. 320. 47
        Grand total-________________-__                              ___
                                                             -----------           3, 287. 706. 33
  The unexpended balance at the end of the fiscal year from allot-
ments from the Emergency Relief Appropriation Act of June 1935,
$83,540.68, will be applied as follows:
Accounts payable___------------        --   ------------------- $59, 522. 27
Payment on contract for constructing crest gates-----------------   22, 857. 35
Complete payment of contract for reconstructing three trestles over
  Short Creek, Ala---        -------------------------------         1, 161.06

        Total----------------            -----------------------------                 83, 540. 68
696           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  An additional sum of $1,807,600 can be profitably expended during
the fiscal year 1939, as follows:
New work:
   Payment for lands submerged by backwater above
     original dam no. 17, Black Warrior River__            $5; 000
   Continuing contract for constructing Tuscaloosa lock
     and dam--------------------------------------      1,250,000
          Total new work--------------------------------------$1,           255, 000
Maintenance (with U. S. plant and hired labor) :
   Operation of 17 locks and dams--------------------      $96, 000
   Ordinary repairs__------------------------------_        36, C03
   Improvement and reconstruction                           20, 090
                                                           1--------------------
   Emergencies---------------------------------------         3, 000
   Channel work:
        Dredging in river channel between mile 45 and
          head of navigation ------------------------      210, 0001
        Snagging in river channel between Chickasaw
               Creek and head of navigation-                                    -      -           65,000
            Routine examinations to determine available
              depths --------------------------------------                                        15, 000
            Stream gaging-----------------------------                                              7, 600

                      Total maintenance_______________________-_____                                                 552, 600
                      Total for all work                                                                              807, 601)
                                                                                                                   1------------------------------

                                        Cost and financial summary

                               MAINTENANCE             AND IMPROVEMENT                 FUNDS

Cost of new work to June 30, 1937------------__---------------                                          $11, 125, 215. 14
Cost of maintenance to June 30, 1937--------------                                                       29, 857, 819. 35

      Total cost of permanent work to June 30, 1937----------                                             20, 983, 034. 49
Plus accounts receivable June 30, 1937                                                                          1, 110. 78

     Gross total costs to June 30, 1937----------------------                                             20, 984, 145. 27
Minus accounts payable June 30, 1937------------------------                                                  175, 274. 78

         Net total expenditures                                   -----------                         13 20, 808, 870. 49
Unexpended balance June 30, 1937                                                                             1, 166, 595. 55

         Total amount appropriated to June 30, 1937------------                                           21, 975, 466. 04

         Fiscal year ending June 30                    1933              1934          1935           1936              1937


Cost of new work- .......                __
                                   . _.......      $40, 503. 84     $79, 219. 93     $1, 011. 86     $8, 322. 11     $550, 135. 93
Cost of maintenance........----------------        408, 333. 03     383, 326. 54    492, 458. 96    511, 206. 44      473, 732.04
      Total cost-........................          448,836. 87      462, 546. 47    493, 470. 82    519, 528. 55 1, 023, 868. 87
Total expended......__-_-...     .    ...__    _._ 481, 030. 03     532, 483.55     448,495. 83    -110,308.46        902, 281. 66
Allotted______-------------- ------     ____       467, 202, 70     476, 379. 79    434, 699. 55    208, 456. 06    1, 242, 100.00

  4 Increased by 1 cent, adjusted value of plant transferred.

Balance unexpended July 1, 1936 ______________-----------                                                     $826, 777. 21
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936------------__ ------------------ ---------                                              1, 242, 100. 00

         Amount to be accounted for_
                                   ----------------------------                                              2, 068, 877. 21
   1 Includes $79,219.93 Public Works Funds.
   2 Includes $8,933,934.55 costs
   3Includes $8,932,686.64 expenditures                       Permanent indefinite appropriation.
   5 Includes $1,247.92
                 RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                          697
Gross amount expended ___-_      _______-_____                                 $904, 648. 60
Less reimbursements collected--------$2, 168. 94
Less receipts from sales______ ______-     198. 00
                                                                                    2,366.94
                                                                                                          $902, 281. 66

      Balance unexpended June 30, 1937---------------------                                            1, 166, 595. 55
Outstanding liabilities June 30, 1937 ____---- - $175, 985. 64
Amount covered by uncompleted contracts------- 3, 541, 054. 34
                                                                                                       3, 717, 039. 98

     Balance available June 30, 1937_____------------------                                      -2,        550, 444. 43
Accounts receivable June 30, 1937_________------------------                                                  1, 110. 78

     Unobligated balance available June 30, 1937__-------                                           -2,     549, 333. 65
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------------------------                                               2, 120, COO. 00

          Balance available for fiscal year 1938__---__----------                                         -429, 333.65
Amount (estimated) required to be appropriated for completion
of existing project 6-___----------------                                                             1, 927, 625. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work a________________________________          _                                              1, 255, 000. 00
   For maintenance 6           __________________                                                            552. 600. 00

          Total 6- - -_- -   -- -- --- -- -- --- -- --- -- --- --- -- --- --- --- --- --
                                                                                                       1, 807, 630. 00
   6Exclusive of available funds.
                                          EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937________________
                                    -____-----                                                             $583, 810. 97
Cost of maintenance to June 30, 1937_________________                                      __________-----------

      Total cost of permanent work to June 30, 1937------ ___                                               583, 810. 97
Undistributed costs June 30, 1937_-__________--___________                                                    2, 080. 62
      Net total cost to June 30, 1937___      _________     __       585. 891. 59
Minus accounts payable June 30, 1937_--------5__      __------------      522. 27                            59,
     Net total expenditures__________________________                                           _            526, 369. 32
                                 -__83,
Unexpended balance June 30, 1937_________________________                                                         540. 68
          Total amount appropriated to June 30, 1937 ------------                                           609, 910. 00

          Fiscal year ending June 30                     1933         1934          1935         1936              1937


Cost of new work_------ ----------          __       -----------
                                                             _____       --- ---      $81, 264. 26 $502, 546. 71
Cost of m aintenance ........................ .................... .................... ................
Total expended---------------...                   --------             ----   __              73, 396. 86      452, 972. 46
Allotted ....   ------------------------ --------------------------------                  609, 910.00


Balance unexpended July 1, 1936---      _______________          ___ $536, 513. 14
Gross amount expended _--_ ____________________ ---     456, 596. 87
Less reimbursements collected_______________________      3, 624. 41
                                                                      452, 972. 46
Balance unexpended June 30, 1937-------------------------------                                              83, 540. 68
Outstanding liabilities June 30, 1937.-.....            59, 522. 27
Amount covered by uncompleted contracts-_        __     24, 018. 41
                                                                                                              83,540. 68
698           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

      CONSOLIDATED COST" AND FINANCIAL SUMMARY FOR WARRIOR RIVER SYSTEM

Cost of new work to June 30, 1937_________________ -                                          -        1 $11, 709, 026. 11
Cost of maintenance to June 30, 1937   ---------  ___9,                                                       857, 819. 35
      Total cost of permanent work to June 30, 1937 __- ___-                                                  21, 566, 845. 46
Undistributed costs June 30, 1937 _________      _______ -                                                          2, 080. 62
      Net total cost to June 30, 1937                             --------       ---
                                                                               _____                          21, 568, 926. 08
Plus accounts receivable June 30, 1937                           _____________1,                                       110. 78
     Gross total costs to June 30, 1937 _______ -                                         -        -____21, 570, 036. 86
Minus accounts payable June 30, 1937--_____---                                                     _        234, 797. 05
     Net total expenditures ._____.___.______a__                                                       18     21, 335, 239. 81
Unexpended balance June 30,1937_- -1________---______                                                          1, 250, 136. 23
           Total amount appropriated to June 30, 1937-----------                                              22, 585, 376. 04

   Fiscal year ending June 30                     1933           1934            1935               1936                 1937


Cost of new work................                $40, 503.84    $79, 219. 93     $1, 011.86        $89, 586. 37       $1, 052, 682. 64
Cost of maintenance-.............               408, 333. 03   383, 326. 54    492, 458. 96       511,206. 44            473, 732. 94
      Total cost .----...............           448, 836. 87   462, 546. 47    493, 470. 82       600, 792.81         1, 526, 415. 58
Total expended      ----------------
                      ...............           481, 030. 03   532, 483.55     448, 495. 83   4 -36,    911. 60       1,355, 254. 12

Allotted            ....---------------------   467, 202. 70   476, 379. 79    434, 699. 55       818, 366. 06        1, 242, 100. 00

  4 Increased by 1 cent, adjusted value of plant transferred.

Balance unexpended July 1, 1936_,,____------------------                                                      $1, 363, 290. 35
Amount allotted from War Department Appropriation Act
  approved May 15, 1936--------------------------------                                                         1, 242, 100. 00

      Amount to be accounted for-------------------------2,                                                         605, 390.35
Gross amount expended-------------------$1, 361, 245.47
Less:
    Reimbursements collected------ $5, 793.35
    Receipts from sales .---- ,-           198. 00
                                                            5, 991. 35
                                                                                                                  1, 355, 254. 12

      Balance unexpended June 30, 1937__       _________   _____                                                1, 250, 136.23
Outstanding liabilities June 30, 1937-----------     235, 507.91
Amount covered by uncompleted contracts           3, 565, 072. 75       ----
                                                                                                                  3, 800, 580. 66

     Balance available June 30, 1937                                                                        -- 2, 550, 444. 43
Accounts receivable June 30, 1937 --                                 ___---_____1,                                     110. 78

      Unobligated balance available June 30, 1937---------                                                  -2,     549, 333. 65
Amount allotted from War Department Civil Appropriation
  Act approved July 19, 1937______________________-----                                                           2, 120, 000. 00
           Balance available for fiscal year 1938- ----                                 --- --         ----         429, 333. 65

Amount (estimated) required to be appropriated for comple-
tion of existing project _----- - -  -         --
                                          -- __________--1,                                                         927, 625. 00

   1 Includes $79,219.93 Public Works funds
       Includes $8,933,93,686.4
                            .55 cosnditures                        Permanent indefinite appropriation.
    SIncludes $1,247.92
   6 Exclusive of available funds.
                RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                     699
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work - - - - - - - - - - - - - - - -___
                                                -- -- --- --- -- --- --- --- -- -
                                                                                                    $1, 255, 000. 00
   For maintenance - - - - - - - - - - - - - - - - - - - - - -- - - -- - - - - - - - - - - -            552, 600. 00
                  - - - - - - - - - - - - - - -   --- --- ----- ----- ----- ---   - - - - - - - -
         Total                                                                                       1, 807, 600. 00
   6 Exclusive of available funds.

    26. TOMBIGBEE RIVER, FROM DEMOPOLIS, ALA., TO WALKERS
                          BRIDGE, MISS.

   Location.-The source of this river is in northeastern Mississippi,
and it flows in a southeasterly direction. Its mouth is 45 miles above
Mobile Bay, where its junction with the Alabama River forms the
Mobile River. Its total length is about 503 miles. (See U. S. Geo-
logical Survey maps of Alabama and Mississippi.)
   Previous projects.-Work between Demopolis and Columbus was
commenced in 1871 and modified in 1879. For the section above
Columbus there are no previous projects. The total cost and ex-
penditure on the section between Demopolis and Columbus was $63,-
382.98, of which $47,342.98 was for new work and $16,040 was for
maintenance. For further details see page 1842, Annual Report for
1915.
    Existing project.-This provides for securing a channel 6 feet deep
at low water by snagging, tree cutting, bank revetment, and bar
improvement, from Demopolis to Columbus, 149 miles. The distance
from the lower end of project at Demopolis to the mouth is 185 miles.
The present project for the section from Columbus to Walkers
Bridge, 169 miles, provides for securing a high-water channel by the
removal of obstructions. This part of the improvement was form-
erly divided into two sections, but later appropriations were made
for the work as one improvement. The extreme fluctuation is 59.7
feet at Demopolis, 45.9 feet at Columbus, and 42.1 feet at Aberdeen.
    The latest (1928) approved estimate for the removal of snags
above Demopolis is $5,000 annually.
    The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the im-
provement and maintenance of the section between Columbus and
Demopolis (H. Doc. No. 156, 51st Cong., 1st sess., and Annual Re-
  port for 1890, p. 1719); the acts of March 32 1873, and August 11,
  1888, provided for the improvement and maintenance of that part
  of the waterway between Columbus and Walkers Bridge (Annual
  Reports for 1873, p. 548, and 1882, p. 1312); act of February 27,
  1911, consolidated the improvement from Demopolis to Walkers
  Bridge under one head and made one appropriation for this section.
  The act of August 30, 1935, provided for the abandonment of the
  project for the slackwater improvement of the Tombigbee River
  above Demopolis (H. Doc. No. 56, 73d Cong., 1st sess.). Since 1911
  work has been restricted to improvement at and below Aberdeen.
  There are no published maps.
    Terminal facilities.-There are no terminal facilities along this
  waterway, and none are required.
     Operations and results during fiscal year.-None.
     Condition at end of fiscal year.-The percentage of the approved
  project accomplished from Demopolis to Columbus cannot be stated.
700          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Since 1902 expenditures have been applied to maintenance under
existing projects for the entire section. For a distance of 119 miles
above Aberdeen navigation is impracticable except for rafting at
mean high water. From Aberdeen to Columbus, about 50 miles, navi-
gation is possible at high-water stages, but dangerous on account of
rapid fluctuation. From Demopolis to mile 75 above the mouth
navigation for about 6 months each year, and from mile 75 to Colum-
bus navigation for about 4 months each year is comparatively safe
at mean and high stages for river steamers with a draft of 4 feet.
The controlling depth at low water is about 1 foot, and navigation
is confined to small craft. The total cost was $368,598.46, of which
$150,307.73 was for new work and $218,290.73 for maintenance. The
total expenditures were $368,598.46.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal years 1938 and 1939.
                                     Cost and financial summary

Cost of new work to June 30, 1937__________________________ $197, 650. 71
Cost of maintenance to June 30, 1937 _______-__  _______  __ 234, 330. 73
      Total cost of permanent work to June 30, 1937------------                                 431, 981. 44
Net total expenditures_________---------______                                                  431, 981. 44
Total amount appropriated to June 30, 1937-----  ______________                                 431, 981.44

        Fiscal year ending June 30               1933          1934          1935       1936         1937


Cost of new work..-...---------           ------------------------------------------------
Cost of maintenance__... _  ___........ __.......... --- _____ __  $6, 668. 58 $5, 778. 29 _ ....
                                 .
Total expended---.-------------------. ---------------
                                              _    _                  -.  6, 652. 37
                                                                      -__-.            5, 794. 50-
                              ------------- ---------------------------- 13, 000. 00
Allotted......................-----                                                    -553. 13


                                  27. BAYOU LA BATRE, ALA.

  Location.-This is a tidal stream about 10 miles long, located in
the southwestern part of the State of Alabama, and empties into
Mississippi Sound. It is 45 miles by water from Mobile Harbor,
Ala., on the east, and 18 miles from Pascagoula Harbor, Miss., on
the west. The entrance to the bayou from Mississippi Sound is
through the channel across the bar at its mouth. (See U. S. Coast
and Geodetic Survey Chart No. 1267.)
  Existing project.-This provides for a channel 6 feet deep at
mean low water and 100 feet wide across the bar and 6 feet deep and
75 feet wide between the mouth and the county highway bridge,
except where the existing depth is 6 feet or more for a width of at
least 50 feet. The length of the channel across the bar is 3,500 feet,
and the section of the bayou included in the project is 21/2 miles in
length. The mean and extreme tidal ranges are 13/4 and 33/4 feet,
respectively.
  The estimated cost for new work, made in 1923, was $20,000, with
$5,000 for annual maintenance.
  The existing project was adopted by the River and Harbor Act of
March 3, 1925 (River and Harbor Committee Doc. No. 4, 68th Cong.,
1st sess.). The latest published map is in the project document.
  Local cooperation.-Fully complied with.
              RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                                                          701

   Terminal facilities.-There are five small wooden wharves, which
are used exclusively in connection with canning factories located
on the bayou. These wharves are considered adequate for existing
commerce.
   Operations and results d'ring fiscal year.-None.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1926, at a saving of $1,369 under the estimated cost. The
project depths and widths have been obtained in the channel in
Mississippi .Sound, across the' bar at the mouth of the bayou, and
in the bayou up to the county highway bridge. The controlling
depths ascertained during June 1937, were as follows: Mississippi
Sound Channel, 6 feet; Bayou La Batre Channel, 6 feet. The total
cost was $51,381.01, of which $18,631.29 was for new work and
$32,749.72 for maintenance. The total expenditures were $51,381.01.
   Proposed operations.-No funds are available for work during the
fiscal year, 1938.
   The sum of $15,000 can be profitably expended during the fiscal
year 1939 on maintenance operations in the restoration of project
dimensions in the channel through the bar at the mouth of the bayou
and at the upper end of the improvement by the operation of a
United States pipe-line dredge for a period of about three-fourths
of a month when required by the needs of navigation.
                                         Cost and financial summary
Cost of new work to June 30, 1937---------------------          $18,.631. 29
Cost of maintenance to June 30, 1937---------------------------32, 749. 72

      Total cost of permanent work to June 30, 1937_--------                                                                      51,381. 01
Net total expenditures--------------------------                                                                                  51, 381. 01
Total amount appropriated to June 30, 1937----------------------                                                                  51, 381.01

        Fiscal year ending June 30                              1933                1934            1935                1936                  1937


Cost ofnew work_.       -    -    - -
Cost of maintenance---------------------
                                                            -      -
                                                                $174. 24
                                                                         -            --
                                                                                 $6, 330. 73
                                                                                                -    -    -        - -
                                                                                                $19, 985.87...................-
                                                                                                                                  -          --
Total expended_-----------
              ......... .....                          .          174. 24          6, 330. 73      9, 965.00       $10, 020. 87...             .....
Allotted.........     ...............-----------------------
                                                      ..------------------------.........        17,979.27              -14.13        ............



Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------------------------------------    $15, 000. 00
                               28. PASCAGOULA HARBOR, MISS.

  Location.-This harbor, located along the lower 6.8 miles of Pas-
cagoula River and the lower 4 miles of Dog River, is in the south-
eastern part of the State of Mississippi, about 61 miles by water
from Mobile Harbor, Ala., on the east, and about 44 miles from Gulf-
port Harbor, Miss., on the west. (See U. S. Coast and Geodetic
Survey Chart No. 1267.)
  Previous projects.-Appropriations were made for Pascagoula
River by River and Harbor Acts of March 2, 1827, May 23, 1828,
and August 30, 1852. The first definite project was adopted by
River and Harbor Act of June 14, 1880. Other projects were adopted
by the River and Harbor Acts of August 5, 1886, August 18, 1894,
702     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

June 3, 1896, March 3, 1899, June 13, 1902, and June 25, 1910. The
cost and expenditures on previous projects were $1,317,065.76, of
which $904,441.61 was for new work and $412,624.15 for maintenance.
 (For further details see p. 1843 of Annual Report for 191.5.)
   Existing project.-This provides for *a through channel of the
maximum dimensions that can be secured by the expenditure of
 $283,000, but not exceeding a depth of 25 feet and width of 300 feet
across the outer bar at Horn Island Pass, and thence a depth of 22
feet and width of 225 feet to the railroad bridge at Pascagoula, and
thence a depth of 22 feet and width of 150 feet, increased at sharp
bends, to a point on Dog River 4 miles above its mouth. Under
ordinary conditions the mean tidal range here is 13/4 feet and the
extreme tidal range is 33/4 feet.
   The estimate of cost for new work, revised in 1914, is $283,000,
exclusive of amount expended on previous projects. The latest
 (1928) approved estimate for anual cost of maintenance is $5,000
for the outer bar channel at Horn Island Pass and $100,000 for the
channels in the river and through Mississippi Sound.
   The existing project was authorized by the following river and
harbor acts: The act of March 4, 1913, provided for limiting the
channel dimensions subject to local cooperation (H. Doc. No. 682,
62d Cong., 2d sess.) ; the act of March 4, 1915, modified the required
local cooperation and provided for the present channel dimensions
 (Rivers and Harbors Committee Doc. No. 12, 63d Cong., 2d sess.).
The latest published map of this locality may be found in House
Document No. 211, Fifty-fourth Congress, second session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The municipal wharf on the east side of Pas-
cagoula River has an available dockage of 1,094 feet. The Louis-
ville & Nashville Railroad Co.'s trestle in the Pascagoula River at
Pascagoula, Miss., just north of their bridge, and the Mississippi
Export Railroad wharf on the Dog River at Moss Point, Miss. have
an available dockage of 60 and 380 feet, respectively. The Farns-
worth Coal Co. has a wharf on the Pascagoula River, located just
north of the Louisville & Nashville Railroad Co.'s trestle. All pri-
vate terminals, together with the municipal wharf, are considered
adequate for existing commerce. (See Port Series, No. 19, Corps of
Engineers.)
  Operations    and results during fiscal year.-The U. S. pipe-line
dredge Wahalak, operating in the Mississippi Sound Channel,
from September 12 to October 13. 1936, removed 850,382 cubic yards
of material over a distance of 25,300 feet. All the above work was
maintenance. The cost was $21,423.56 for maintenance. The ex-
penditures were $21,423.56.
   Condition at end of fiscal year.--The 21-foot Horn Island Pass
Channel was completed in 1908. The existing project, at the end of
the fiscal year, was 42 percent completed. The controlling depths,
a eertained in June 1937, were as follows: Horn Island Pass, 19 feet;
Mississippi Sound Channel, 17 feet; and Pascagoula River Channel,
16 feet. The work remaining to be done to complete the project
consists of obtaining such additional depths and widths of channel,
not exceeding the maximum dimensions, as may be secured by the
total authorized expenditure of $283,000. The total cost was
                   RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                               703
$817,363.01, of which $103,037.87 was for new work and $714,325.14
for maintenance. The total expenditures were $817,363.01.
   Proposed operations.-No funds are available for work during the
fiscal year 1938.
   The sum of $60,000 can be profitably expended during the fiscal
year 1939 for providing channel dimensions adequate to meet the
needs of navigation by maintenance dredging with a United States
hydraulic pipe-line dredge in the Mississippi Sound and River Chan-
nels for a period of about 3 months at such times as may be necessary.
                                         Cost and financial summary

Cost of new work to June 30, 1937_______________---_____                                                 _ $1, 007, 479. 48
Cost of maintenance to June 30, 1937____________                                                              , 126, 949. 29
                                                                                                            1--------__-
      Total cost of permanent work to June 30, 1937___________-2, 134, 428. 77
Net total expenditures        __________-------------2,           134, 428. 77
Total amount appropriated to June 30. 1937_____--       _______ 2,134, 428. 77

         Fiscal year ending June 30                    1933                1934           1935              1936           1937

Cost of new wcrk_... ........-.---.                           ..-....             _                            _----------
Cost of maintenance.   ---------------------           $459. 51         $27, 573. 72   $32, 595. 62   $29, 647. 28     $21, 423. 56
Total expended--....-----......-..-.--__              9, 514. 32         27, 781. 46    32, 146. 86    30, 098. 04      21, 423. 56
Allotted-.......                      .--.--.----
                                      .----------   - 30, 000. 00        26, 641. 68    32, 000.00     30, 000. 00     -8, 552. 08



Balance unexpended July 1, 1936___---------- -----------                                                           $29, 975.64
Deductions on account of revocation of allotment-___________                                                         8, 552. 08
      Net amount to be accounted for--------------------------                                                       21, 423. 56
Gross amount expended ______________-__-_____-_____-                                                                 21, 423. 56
Amount (estimated) required to be appropriated for completion
  of existing project -----------------           __-180,                                                                000. 00
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance_____________----_____________                                                       60, 000. 00

                                29. PASCAGOULA RIVER, MISS.

  Location.-This river is formed by the confluence of the Leaf and
Chickasahay Rivers near Merrill, in the southeastern part of Missis-
sippi, and empties into Mississippi Sound at Pascagoula. (See U. S.
Geological Survey map of Mississippi.)
  Previous projects.-Adopted by River and Harbor Act of June 14,
1880. The cost and expenditure was $15,000 for new work. (For
further details, see p. 1845 of Annual Report for 1915.)
  Existing project.-This provides only for the maintenance of the
channel above the mouth of the Dog or Escatawpa River, a distance
of 82.1 miles, by the removal of obstructions from time to time. The
mean and extreme tidal variations at the mouth are about 11/2 and 4
feet, respectively. The ordinary and extreme fluctuations at Merrill,
due to floods, are 19.4 and 26.2 feet, respectively. The latest (1928)
approved estimate for annual cost of maintenance is $3,500.
         20196---37--pt. 1----45
704               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The existing project was adopted by the River and Harbor Act of
August 5, 1886, and included dredging at the mouth of the river.
The River and Harbor Act of March 3, 1899, limited the improve-
ment to the section above the mouth of Dog River, and appropriations
since have been made accordingly. This project is based on an exam-
ination for report of which see Annual Report for 1879, page 835.
For the latest published map see House Document No. 1723, Sixty-
fourth Congress, second session.
   Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The controlling depth at mean low
water is 7 feet from mouth of Dog River to Dead Lake, 32 miles
and 3 feet in the remaining 50 miles of the project section above Dead
Lake. The total cost and expenditures were $114,110.41, all mainte-
nance.
   Proposed operation.-No funds are available and no operations are
contemplated during the fiscal years 1938 and 1939.
                                                   Cost and financial summary

Cost of new work to June 30, 1937-------------- ---------------- $15, 000. 00
Cost of maintenance to June 30, 1937----------------------------114, 110. 41
      Total cost (f permanent work to June 30, 1937____--,,-                                                            -             129, 110. 41
Net total expenditures--------- -------    ___-----__                                                                                 129, 110.41
Total amount appropriated to June 30, 1937-------------                                                                             _ 129, 110. 41


           Fiscal year ending June 30                                 1933               1934              1935               1936          1937
Cost of new work................             ..........       ............         ............          9 25.. , 9......................
Cost of maintenance--.---------------------------                                  ----------- $9,256.99-------------
Total expended-------------------------_                                        ------------             9,256.99-------------
Allotted---..........---...............---        .....------............----------------.... --............10,000.00       -$743.01..........


                                                 30. BILOXI HARBOR, MISS.

   Location.-Located on the Mississippi Sound in the southeastern
part of the State of Mississippi. It is 32 miles by water from Pasca-
goula Harbor, Miss., on the east, and 14 miles from Gulfport Harbor,
Miss., oil the west. (See U. S. Coast and Geodetic Survey Chart
No. 1267.)
   Previous projects.-Adopted by River and Harbor Acts of August
2, 1882, and July 5, 1884. The cost of the previous project was $130,-
691.80, of which $44,382.27 was for new work and $86,309.53 was for
maintenance. The total expenditures were $129,859.05. (For further
details, see p. 1846 of Annual Report for 1915 and p. 863 of Annual
Report for 1929.)
   Existing project.-This provides for a channel west of Deer Island
10 feet deep and 150 feet wide from the 10-foot contour in Mississippi
Sound to the south water front of the city of Biloxi, and thence
north of Deer Island to deep water in Back Bay of Biloxi. Under
ordinary conditions, the mean tidal range is about 13/4 feet.
             RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                              705
   The estimate of cost for new work made in 1927 was $82,000, exclu-
sive of amounts expended on previous projects but including $30,500
to be contributed by local interests. The latest (1927) approved esti-
mate for annual cost of maintenance is $18,500.
   The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (H. Doc. No. 754, 69th Cong., 2d sess.). The
latest published map of this locality may be found in the project
document.
   Local cooperation.-The act adopting the existing project provides
that local interests shall construct a public terminal adequate for
coastwise traffic, under plans to be approved by the Chief of Engi-
neers, and contribute $30,000 toward the first cost of the improve-
ment.
   The above provisions were modified as follows by the War Depart-
ment Appropriation Act of February 23, 1931:
   "That the conditions imposed upon the improvement of Biloxi
Harbor, Miss., authorized to be carried out in accordance with the
report submitted in House Document No. 754, Sixty-ninth Congress,
second session, may, in the discretion of the Chief of Engineers of the.
Army and the Secretary of War, be modified so as to provide that.
the local interests shall give assurances that they will construct a
public terminal adequate for coastwise traffic, under plans to be
approved by the Chief of Engineers of the Army, whenever in his,
opinion such construction is necessary, and that such local interests,
in the event of modification of such conditions, shall contribute:
therefor at least $5,000 toward the first cost of the improvement,,
and at least $5,100 annually thereafter for 5 successive years." Thet
initial payment and two subsequent payments, totaling in all to
 $15,200, have been made. The Secretary of War on February 17,
1936, under authority granted him by joint resolution approved
March 3, 1933, waived further contributions by local interests.
    Terminal facilities.-Consist of a number of light timber wharves
owned by private parties but available to the public without charge.
These are considered adequate for the present commerce.
    Operations and results during fiscal year.-The U. S. pipe-line
dredge Wahalak, operating in the Biloxi Channel, from August 28 to
September 11, 1936, removed 251,748 cubic yards of material. The
above work was all maintenance. The cost was $9,340.35 for mainte-
nance. The expenditures were $9,552.86.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1932 at a saving of $43,088 under the estimated cost. The
controlling depth ascertained in June 1937 was 8.0 feet.
    The total costs and expenditures for the existing project to June
30, 1937, were as follows:

                                                                   Costs
                                                                                                Expendi-
                                                                                 Total           tures
                                                 New work       Maintenance

                 -------------------------
Regular funds........                            $33,353.35       $30,140.04     $63, 493.39     $64, 326.14
Contributed funds. .--------------------------     5,000.00        10, 200. 00    15, 200.00      15, 200.00
     Total. - ------------------------------      38, 353. 35      40, 340. 04    78, 693. 39     79, 6526.14
706               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Proposed operations.-No funds are available for work during the
fiscal year 1938.
   The sum of $25,000 can be profitably expended during the fiscal
year 1939 in removing the shoaling from this channel by maintenance
dredging with a United States hydraulic pipe-line dredge about 114
months, at such times as may be required by the needs of navigation.
                                       Cost and financial summary
Cost of new work to June 30, 1937-        __-                                               -      -           $77, 735. 62
Cost of maintenance to June 30, 1937_-------------------------                                                 116, 449. 57
      Total cost of permanent work to June 30, 1937------------                                                194, 185. 19
Net total expenditures                                                                                  -94,          185. 19
                                                                                                                1--------------------------
Total amount appropriated to June 30, 1937 .11 -------                                                        '194,185. 19


     Fiscal year ending June 30            1933            1934             1935                 1936                1937

Cost of new work---..-----            ---------------------------- --------------        ----------------------------
Cost of maintenance-_ _------              $2, 987. 80    $9, 602. 27     $231. 29              $7, 420.16           $9, 340. 35

Total expended---..--------------..        3, 156. 80      9, 602. 27   -.---.......             7, 438. 94           9, 552. 86

Allotted.....----------------------15, 000. 00          -13, 087. 72       12, 648. 84           9, 000. 00         -5, 008. 20



Balance unexpended July 1, 1936------------------
                                     .                                                                         $14, 561.06
Deductions on account of revocation of allotment------------.-                                                   5, 008. 20

      Net amount to be accounted for ---------------------------                                                  9, 552. 86
Gross amount expended--------------------------------                                                             9, 552. 86
Amount that 'can be profitably expended in fiscal year ending June
  30, 1939, for maintenance---------------------------------                                                    25, 000. 00
    1 Exclusive of $5,000 for new work and $10,200 for maintenance from contributed funds.

                31. GULFPORT HARBOR AND SHIP ISLAND PASS, MISS.
   Location.-Gulfport Harbor is located on Mississippi Sound in
the southeastern part of the State of Mississippi, about 44 and 90
miles by water from Pascagoula Harbor, Miss., and Mobile Harbor,
Ala., respectively, on the east, and 78 miles from New Orleans (via
the inside route through Lake Borgne, the Rigolets, Lake Pontchar-
train, and industrial canal) on the west. (See U. S. Coast and
Geodetic Survey Chart No. 1267.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1899 (H. Doc. No. 120, 55th Cong., 3d sess.), March 2,
1907, February 27, 1911, and January 21, 1927. (For further details
see p. 1846 of Annual Report for 1915 and p. 857, Annual Report for
1929.)
   The cost of the previous projects was $2,581,310.46, of which $269,-
017.92 was for new work and $2,312,292.54 was for maintenance. The
total expenditures were $2,561,968.76.
   Existing project.-This provides for a channel 27 feet deep and 300
feet wide across Ship Island bar, a channel 26 feet deep and 220 feet
wide through Mississippi Sound, and a depth of 26 feet in the an-
chorage basin at Gulfport. Under ordinary conditions the mean
tidal range here is about 1/4 feet, and the extreme tidal range ig
about 31/2 feet.
              RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                      707
   The estimate of cost for new work made in 1927 was $200,000, ex-
clusive of amounts expended on previous projects. The latest (1927)
approved estimate for annual cost of maintenance is $185,000.
   The existing project was adopted by the River and Harbor Act,
approved July 3, 1930 (H. Doc. No. 692, 69th Cong., 2d sess.). The
latest published map of this locality is in the project document.
   Terminal facilities.-A municipal wharf provides a dockage length,
of 200 feet for vessels of 10-foot draft. A municipal pier provides a
dockage of 1,800 feet for deep-draft vessels. The Illinois Central
Railroad pier provides an available dockage of 3,800 feet. Existing
terminals are considered adequate for present commerce. (See Port
Series No. 19, Corps of Engineers.)
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Wahalak, from October 14 to December 6, 1936, removed
1,594,965 cubic yards of material over a distance of 19,233 feet. The
above work was all maintenance. The total cost was $37,282.22, for
maintenance. The expenditures were $50,847.71.
   The total cost, all funds, was $37,232.22, of which minus $50 was
for new work and $37,282.22 for maintenance. The total expendi-
tures were $50,847.71.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934. The controlling depths at mean low water, ascer-
tained during June 1937, are as follows: Ship Island Bar Channel,
27 feet; Mississippi Sound Channel, 24 feet; anchorage basin, 26
feet.
   The total costs and expenditures under the existing project to
June 30, 1937, were as follows:

                                                                      Costs
                                                                                                      Expendi-
                                                                                                       tures
                                                New work        Maintenance            Total


Regular funds___                                 $70, 427. 77       $491, 091. 66   $561, 519. 43      $580, 490. 07
Public Works funds __________________________     47, 883. 19   _                     47, 883. 19        47, 883. 19

     Total___________________________________    118, 310. 96        491, 091.66     609, 402. 62       628, 373.26



   Proposed operations.-The balance unexpended at the end of the
fiscal year, $23,014.64, plus an allotment of $80,000 made during July
1937, will be applied as follows:
Accounts payable June 30, 1937_____-_________________                                                  $371. 06
New Work: N. I. R. A. funds to be revoked---            ________                                         50. 00
Maintenance:
    Restoration of project dimensions in the Gulfport Ship Channel
      and Anchorage Basin by contract, or by Government plant
      and hired labor, about 6 months, July 25 to Oct. 31, 1937,
      and Apr. 1 to June 30, 1938_--------       _                                                   91, 593. 58
    Dredging with a United States seagoing hopper dredge to re-
      store project dimensions in the Ship Island Pass, or outer
      bar channel, about           /.
                              month, January 1938______________                                      11, 000. 00

          Total     _-----._________-___________           ______--_                                103, 014. 64

  The additional sum of $150,000 can be profitably expended during
the fiscal year 1939 for maintenance dredging by contract, or by
Government plant and hired labor, to remove the shoaling in the
708           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gulfport Ship Channel and Anchorage Basin, about 71/2 months,
when necessary to meet the needs of navigation.
                                     Cost and financial summary

Cost of new work to June 30, 1937-----------------------------                                          $387, 328.88
Cost of maintenance to June 30, 1937------------------------                                          2, 803, 384.20
     Total cost of permanent work to June 30, 1937------------3,                                          190, 713. 08
Minus accounts payable June 30, 1937--------------------------                                                 371. 06

     Net total expenditures---------------------------------13, 190, 342.02
Unexpended balance June 30, 1937---------       --        -----  23, 014. 64

         Total amount appropriated to June 30, 1937 --------------13, 213, 356. 66


         Fiscal year ending June 30                   1933           1934          1935           1936            1937


                  .... ________--_
Cost of new work____                 _                $931. 39    $42, 610. 85   $5, 775. 50    -- 453. 00       2 -$50. 00
Cost of maintenance__----. ------  _               88, 016. 24     94, 151. 25   62, 450. 91   150, 930. 77      37, 282. 22

      Total cost_____....    .......
                             ___...
                              ____           ... 88, 947. 63      136, 762. 10   68, 226. 41   150, 480.77       37, 232. 22
Total expended_____ _ ________--__             _   81, 360. 92    126, 512. 87   90, 163.44    136, 653. 87      50, 847. 71
Allotted_.............      ..-.-- .-- .--         155, 000. 00   163, 943. 30   84, 088. 50   85, 000. 00     -25, 895. 97


Balance unexpended July 1, 1936--------------------------------                                           $99, 758. 32
Deductions on account of revocation of allotment -----------------                                         25, 895. 97
      Net amount to be accounted for___                                                                       73, 862. 35
Gross amount expended----------------------------  $51, 634. 69
Less reimbursements collected $736.98 regular, $50
N. I. R. A---------------------------------------      786. 98
                                                                                                              50, 847.71

      Balance unexpended June 30, 1937 ------------------------                                               23, 014. 64
Outstanding liabilities June 30, 1937----------------------------                                                 371. 06
     Balance available June 30, 1937---------------------------                                               22, 643. 58
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------------                                                80, 000.00
        Balance available for fiscal year 1938------- ---------------                                     102, 643. 58
Amount that can be profitably expended in fiscal year ending June
  30, 1939; for maintenance 3-----------------------------------                                          150, 000. 00
12 Includes
    Refund
             $47,883.19 Public Works funds.
             of liquidated damages, Public Works funds.
   s Exclusive of available funds.

                            32. WOLF AND JORDAN RIVERS, MISS.

   Location.-This improvement, located in the southeastern part of
the State of Mississippi, consists of dredged channels 1.6 and 2 miles
long, respectively, at the mouths of Wolf and Jordan Rivers, tribu-
taries of St. Louis Bay. It is 24 miles by water from Gulfport,
Miss., on the east, and 54 miles from New Orleans, La. (via the in-
side route through Lake Borgne, Lake Pontchartrain, and the Indus-
trial Canal), on the west. (See U. S. Coast and Geodetic Survey
Chart No. 1268.)
  Existing project.-This provides for dredging at the mouths of
these streams, channels 7 feet deep at mean low water and 100 feet
                 RIVERS AND HARBORS-MOBILE,                                   -ALA.,    DISTRICT                      709
wide, extending from the 6-foot contour in St. Louis Bay to the
7-foot contour in each stream. The length of the dredged channel
at the mouth of Wolf River is about 1.6 miles and at the mouth of
Jordan River about 2 miles. Under ordinary conditions the mean
tidal range here is about                        13/4
                                  feet, and the extreme tidal range is
about 31/2 feet. The estimate of cost for new work, made in 1906,
was $30,000. The latest (1928) approved estimate for annual cost of
maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1907 (H. Doc. No. 917, 59th Cong., 1st sess.). The latest
published map is in the project document.
   Terminal facilities.-There are no terminal facilities and none are
required, as this project is for dredging channels through bars at the
mouths of Wolf and Jordan Rivers, Miss.
   Operations and results during fiscal year.-None.
   Condition at end of fical year.-The existing project was com-
pleted in 1908 at a saving of $805 under the estimated cost. All
work on this improvement consisted of dredging, and expenditures
since its completion have been applied to maintenance. The con-
trolling depths at mean low water in these channels ascertained dur-
ing June 1937 are as follows: Wolf River, 5.0 feet; Jordan River,
5:0 feet. The total costs and expenditures were $61,196.67, of which
$29,195.19 was for new work and $32,001.48 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $10,000, will be applied to the operation of the U. S.
hydraulic pipe line dredge Blackwater for a period of approxi-
mately two-thirds month, July 18 to August 6, 1937, in restoring
project dimensions in the Wolf and Jordan Rivers to meet the needs
of navigation.
   No additional funds can be profitably expended during the fiscal
year 1939, as no maintenance work will be necessary to meet needs
of navigation.
                                          Cost and financial summary
Cost of new work to June 30, 1937------------ -------------- $29, 195.19
Cost of maintenance to June 30, 1937----------------------- 32, 001. 48
          Total cost of permanent work to June 30, 1937-------------61, 196. 67

Net total expenditures-----------__                                                                            61, 196. 67
Unexpended balance June 30, 19371111                                                                           10, 000.00
          Total amount appropriated to June 30, 1937---------------71, 196.67


          Fiscal year ending June 30                       1933        1934          1935          1936             1937


Cost of new work ---...........---------......------------------..-..-.-- ..       -      .   .    .-                  .-
Cost of maintenance----        ... _                   ------------       --------   --------- ------     -     -        -..
Total expended.      ........... .   .I           ..................                                      _     ...........
Allotted..........--------------------                                          ...........
                                              ---------------------------------------------                    ----. $10, 000


Amount allotted from War Department Appropriation Act approved
  May 15, 1936---------------------------------------                                                         $10, 000. 00
Balance unexpended June 30, 1937--------.-5-,.-..._                                               --           10, 000. 00
710         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  33. EXAMINATIONS,              SURVEYS, AND CONTINGENCIES                                         (GENERAL)

   The cost of the new work during the year was $248,667.98; the ex-
penditures were $223,984.31. The balance unexpended and accounts
receivable at the end of the fiscal year, $61,304.38, plus an anticipated
allotment of $320,000, a total of $381,304.38, will be applied as needed
during the fiscal year 1938 to payment of expenses incurred under
this heading.
   The additional sum of $175,000 can be profitably expended during
the fiscal year ending June 30, 1939.
                                  Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937----------------------------                                           $801, 476.48

      Total cost of permanent work to June 30, 1937-------------                                            801, 476. 48
Plus accounts receivable June 30, 1937-----    ------------------                                                163.66

     Gross total costs to June 30, 1937-------------------                                                  801, 640. 14
Minus accounts payable June 30, 1937 ---------------------------                                             33, 115. 42

     Net total expenditures------------------------------------                                             768, 524. 72
Unexpended balance June 30, 1937---                                                                          61, 140. 72

        Total amount appropriated to June 30, 1937-- --------------                                         829, 665. 44


        Fiscal year ending June 30             1933             1934             1935               1936           1.937


Cost of new work----                         ---------------           ------------                ---            ------
Cost of maintenance_------------------$45, 648. 78         $98, 057. 40      $135, 230. 42 $167, 104. 62        $248, 667. 98

Total expended......----------------------   45, 943. 70    89, 364. 52       133, 218. 71      170, 126. 28     223, 984. 31

         ----------------------------
Allotted__                                   80, 292. 21    76, 503. 33       191, 092. 49      192, 362. 16     177, 715. 25



Balance unexpended July 1, 1936------------------------------- $107, 409.78
Amount allotted from War Department Appropriation Act approved
May 15, 1936_------------------------------                    177, 715. 25
      Amount to be accounted for--------------------------------285, 125. 03
Gross amount expended ---------------------------- $330, 024. 95
Less-
    Reimbursements collected ----------- $106, 037. 14
    Receipts from sales ------------------       3. 50
                                                       106, 040. 64
                                                                    223, 984. 31
        Balance unexpended June 30, 1937                   --          ---               ----                  61, 140. 72
Outstanding liabilities June 30, 1937------------------------------                                            46, 784. 08
     Balance available June 30, 1937----------------------------                                               14, 356. 64
Accounts receivable June 30, 1937--------------------------------                                                  163. 66

     Unobligated balance available June 30, 1937                    ------                                     14, 520. 30
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------------------------------------------___                                            75, 500. 00
        Balance available for fiscal year 1938---------------------                                            90, 020. 30
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1--------___-_                                                                   175, 000. 00
1 Exclusive of available funds.
                     RIVERS AND HARBORS--MOBILE, ALA., DISTRICT                                                                711
34. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                       [Commercial statistics for these projects are given in pt. 2 of report]

                                                                               For       Cost and expenditure
                                                                            last full      to June 30, 1937                   Esti-
                                                                             report                                          mated
                          Name of project                                   see An-                                         amount
                                                                              nual                         Mainte-          required
                                                                            Report New work                nance             to com-
                                                                              for-                                             plete

1. Flint River, Ga.' 3____________________ __________________ 1933 $640, 819.77                          $182, 577. 77        $89, 200
2. Choctawhatchee River, Fla. and Ala.1       --------------------
                                                              1933  171, 884. 50                          258, 904. 79         (2)
3. Holmes River, Fla.___________________________________      1931   5 6, 401. 25                          38, 813. 21          (2)
4. Escambia and Conecuh Rivers, Fla. and Ala.' -- --..                        1934       118,336. 26      104, 575. 24         (2)
5. East Pearl River, Miss.'-_-_____                                           1933        37, 127. 93      34, 144. 18         (2)
6. Pearl River, Miss. and La.s_______________________________                 1935       144, 443. 31     168, 171. 64        415, 000

   1 Channels adequate for existing commerce.
   2 Completed.
   3 Eliminating improvement above Albany recommended in H. Doc. No. 302, 65th Cong., 1st sess.
   4Commercial boats have withdrawn, and at present no traffic exists.
   a Exclusive of $2,160.80, which amount was expended for work on LaGrange Bayou.
   6 Pending approval of the project by the Board of Engineers for Rivers and Harbors.


                 35. PLANT ALLOTMENT FOR MOBILE, ALA., DISTRICT

                                       Cost and financial summnary

Undistributed costs June 30, 1937----------------------------    $1, 705, 052. 53
Plus accounts receivable June 30, 1937--------------------------     151, 332. 89

           Gross total costs to June 30, 1937_                   ---                                           1, 856. 385. 42
Minus accounts payable June 30, 1937_                           _______________________                           100, 378. 33

           Net total expenditures_--_ -------------------------------                                          1, 756, 007. 09
Unexpended           balance June 30, 1937                    ______             ____                               74, 934. 30

           Total amount appropriated to June 30, 1937                                                          1, 830, 941. 39


    Fiscal year ending June 30                1933              1934              1935                  1936                1937


Total expended__________                __--________________--_             $1, 153, 834. 18      $614,657. 57           -$12, 484. 66
Allotted---------_                    _------------------_-            -_    1, 216, 273. 91       622, 667. 48            -8, 000.00



Balance unexpended July 1, 1936___-----------------------------                                                   $70,449.64
Deductions on account of revocation of allotment ------ _-----                                                      8, 000. 00
       Net amount to be accounted for_                  -___ - -_________ 62,  449. 64
                                                                            6______-
Gross amount expended__--_____-___________               $1, 395, 175. 59
Less :
    Reimbursemments collected-----__   $1, 401,267. 60
    Receipts from sales_--- - __--_-         6, 392. 65
                                                          1, 407, 660. 25
                                                                          -12, 484. 66
      Balance unexpended June 30, 1937________----------------________                                             74, 934. 30
Outstanding liabilities June 30, 1937__________--  ______           --                                             03, 393.06
                                                                                                                  1______
      Balance available June 30, 1937___________________________ -- 28, 458. 76
Accounts receivable June 30, 1937____________                     151, 332. 89
           Unobligated balance available June 30, 1937                                                            122, 874. 13
712       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

36. ESCAMBIA RIVER BASIN-ESCAMBIA RIVER AT FLOMATON, ALA.,
                      FLOOD CONTROL

   Location.-The project is located on the west bank of the Escambia
River, Ala., near Flomaton, Ala.
   Existing project.-The existing project provides for the construc-
tion of ring levees around the town of Flomaton, Ala., to protect
people and town property from the overflow waters of the Escambia
River.
   The estimated construction cost is $149,000, and the estimated cost
of lands and damages is $5,000.
   The existing project was authorized by the Flood Control Act of
June 22, 1936 (H. Doc. No. 350, 71st Cong., 2d sess.).
   Local cooperation.-See page 6.
   Ring levees for flood control being considered unsatisfactory by
the local authorities, cooperation required by the Flood Control Act
was refused.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.--An allotment made during October 1937
will be applied to preparation of a definite project report.
                         Cost and financial summary

Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion of
existing project    ------------------------------------------ $149,000
37. ESCAMBIA RIVER BASIN-CONECUH RIVER AT BREWTON, ALA.,
                      FLOOD CONTROL

   Location.-The project is located on the west bank of the Conecuh
River, Ala., at the junction of Burnt Corn and Murder Creeks, near
Brewton, Ala.
   Existing project.-The existing project provides for the construc-
tion of ring levees around the town of Brewton, Ala., to protect the
people and property from the overflow waters of Escambia (Cone-
cuh) River, at an estimated construction cost of $235,000, and $7,000
for lands and damages. The existing project was authorized by the
Flood Control Act of June 22, 1936 (H. Doc. No. 350, 71st Cong., 2d
sess.).
  Local cooperation.-See page 6.
  Ring levees for flood control being considered unsatisfactory by the
local authorities, cooperation required by the Flood Control Act was
refused.
   Condition at end of fiscal year.-No work has been done.
  Proposed operations.-An allotment made during October 1937
will be applied to preparation of a definite project report.
                         Cost and financial summary
Total amount appropriated to June 30, 1937-----------------...--------
Amount (estimated) required to be appropriated for completion of
existing project------------------------------------------            $235, 000
          RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                   713
  38. MOBILE RIVER BASIN-COOSA          RIVER AT ROME, GA.-FLOOD
                                CONTROL

   Location.-The project is located on the Coosa River, Ga., near
Rome, Ga.
   Existing project.-This provides for the construction of ring levees
around the city of Rome, Ga., with the necessary provisions for high-
ways, railroads, and city drainage, to protect the people and city
property from the overflow waters of the Coosa River, at an esti-
mated cost of $330,000. The existing project was authorized by the
Flood Control Act of June 22, 1936.
   Local cooperation.-See page 6.
   Operations and results during fiscal year.-The definite plan of
flood control at Rome, Ga., was submitted and the costs therefor were
charged to new work and defrayed from Emergency Relief funds
for assistance to educational, professional, and clerical persons.
Other work necessary for preparation of the definite plan was done
coincidentally with and charged to review of reports, Alabama-
Coosa branch of Mobile River system, Ga. and Ala.
   Condition at end of fiscal year.-No work has been done on the
project.
   Proposed operations.-The allotment of $391,080, made during Au-
gust 1937, will be applied to the construction of levees around the
fourth ward of Rome, Ga., resulting in completion of the project.
    39. MOBILE RIVER BASIN AT FULTON, MISS.-FLOOD CONTROL

  Location.-The project is located on the Tombigbee River, Miss.,
near Fulton, Itawamba County, Miss.
  Existing project.-This provides for clearing the channel and flood-
way of the Tombigbee River from Walkers Bridge in Itawamba
County into Monroe County for a distance of about 65 miles, shorten
and improve the channel by several cut-offs, and provide other inci-
dental improvements to protect people and valuable agricultural
property from overflow waters of the Tombigbee River, at an esti-
mated construction cost of $109,000. The existing project was author-
ized by the Flood Control Act of June 22, 1936.
  Local cooperation.-See page 6.
   Operations and results during fiscal year.-No money has been ap-
propriated for this project, although studies thereon which are being
made coincidentally with the Tennessee-Tombigbee survey are in
progress.
   Condition at end of fiscal year.-No work has been done.
  Proposed operations.-Studies on this project, which are being
made in connection with the Tennessee-Tombigbee survey, will be
completed. An allotment made during October 1937 will be applied
to preparation of a definite project report.
                        Cost and financial summary
Total amount appropriated to June 30, 1937----------------------- ------
Amount (estimated) required to be appropriated for completion of
existing project----------------------        ---         -      $10, Q0)
714         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

40. PEARL RIVER BASIN-PEARL RIVER, MISS. AND LA., AT JACKSON,
                    MISS.-FLOOD CONTROL

  Location.-The project is located on the Pearl River, Miss., and La.,
near Jackson, Miss.
  Existing project.-This provides for clearing the channel and flood-
way of the Pearl River to protect the people and property in Jackson,
Miss., and immediate vicinity, at an estimated construction cost of
$10,000. The existing project was authorized by the Flood Control
Act of June 22, 1936.
  Local cooperation.-See page 6.
  Clearing flood plain for flood control being considered unsatisfac-
tory by the local authorities, cooperation required by the flood control
act was refused.
   Condition at end of fiscal year.-No work has been done. No work
is proposed due to noncompliance with conditions of local coopera-
tion.
                                  Cost and financial summary
Total amount appropriated to June 30, 1937-----------------------------
Amount (estimated) required to be appropriated for completion of
existing project------------------------------     -----------   $10, 000
                     41. COLLINSVILLE, ALA.-FLOOD CONTROL

  The War Department Civil Appropriation Act approved July 19,
1937, contained an item authorizing such works as may be necessary
for the protection of the town of Collinsville, Ala. No work has
been done under this authorization.
Status of reports called for by river and harbor acts and committee resolutions

                                                   Date trans-
        Locality             Authorization act      mitted to        Document No.         Recommenda-
                                                    Congress
                                                                                              tion
                        II
Alabama-Coosa branch Rivers and Harbors
  of Mobile River sys-      Committee resolu-                         --- ---- ---- ---
                                                                      -----
  tem, Ga. and Ala.         tion, Apr. 28, 1936.
Apalachicola Bay, Fla._ Rivers and Harbors
                            Committee resolu-
                            tion, Apr. 29, 1937.
Apalachicola-Chatta-      Rivers and Harbors
  hoochee and Flint         Committee resolu-
  Rivers, Ga. and Fla.      tion, Apr. 28, 1936.
Apalachicola River, River and Harbor
   Fla., inland waterway    Act, Mar. 3, 1925.
  to New Orleans, La.,
  and Apalachicola-
   Chattahoochee River
  to Columbus, Ga.
Apalachicola River to River and Harbor
  St. Andrews Bay           Act, Aug. 26, 1937.
  waterway, channel
  from to 30-ft. depth
  in St. Josephs Bay,
  Fla.
Biloxi, Back Bay of, River and Harbor
   Miss.                    Act, Aug. 26, 1937.
Black Warrier River to Rivers and Harbors          Apr. 27,1937 _______________________I Unfavorable.
  Fivemile Creek, Ala.      Committee resolu-
                            tion, Jan. 24, 1936.
Bon Secours Bay, Ala., River and Harbor            Nov. 19, 1936                             Do.
  to the Gulf, via Oyster   Act, Aug. 30, 1935.
  Bay, waterway.
Carrabelle Bar and Rivers and Harbors              Mar. 26,1937    House, 184, 75th       Favorable.
  Harbor, Fla.              Committee resolu-                       Cong., 1st sess.
                            tion, Jan. 16, 1935.
Carrabelle, Crooked, River and Harbor              July   8,1937   House, 291, 75th          Do.
   Ochlockonee Rivers       Act, Aug. 30, 1935.                     Cong., 1st sess.
  and Ochlockonee
  Bay, Fla.
     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937                                                                                 715
        Status of reports called for by river and harbor acts and committee
                               resolutions-Continued.

                                                          Date trans-                                                     Recommenda-
                                 Authorization act         mitted to                Document No.                          Recommenda-
        Locality
                                                           Congress


Carrabelle Harbor, Fla.,     River and Harbor            Mar. 26, 1937       House, 184, 75th Cong., Favorable.
channel to docks at          Act, Aug. 30, 1935.                             1st sess.
Carrabelle.
Chattahoochee     River,     River and Harbor Act,
Ga., and connecting          July 3, 1930.
waterways.
Chickasawha River and        Flood Control       Act,
tributaries, Miss. (pre-      May 6, 1936.
liminary examination
for flood control).
Coosa River, Ga. and         'Rivers and Harbors
Ala. (flood control).          Committee resolu-
                                tion, Apr. 1, 1936.
East    Pass    Channel,      River and Harbor Act,
  Gulf of Mexico into           Aug. 26, 1937.
  Choctawhatchee Bay,
  Fla.
Florida River, Liberty      --    do ..--.
  County, Fla., and the
  Apalachicola River at
  and near mouth of
  Florida River.
Grand     Lagoon      via    River and Harbor Act,       May 25, 1937                                                     Unfavorable.
  Bayous Grand and            Aug. 30, 1935.
  Chico to Pensacola
  Bay,    Fla.,   as an
  extension of the Intra-
  coastal Waterway.
Gulfport Harbor, Miss_       River and Harbor Act,
                              Aug. 26, 1937.
Legare Bayou, Miss., at      -_- do - -      -   -   -
  mouth    of  Jordan
  River.
Mobile Harbor, Ala ....      Rivers and Harbors          July    8, 1937      Rivers and Harbors                          Favorable.
                               Committee resolu-                               Committee, 44, 75th
                               tion, Mar. 9, 1937.                             Cong., 1st sess.
Pascagoula Harbor and        River and Harbor Act,
   Horn Island Pass.           Aug. 30, 1935.
   Miss.
Pearl    River,    Miss.,    River and Harbor Act,
   below Jackson.              July 3, 1930.
Pensacola Bay, Fla., to      Rivers and Harbors          Nov. 17, 1936                                                    Unfavorable-
   Mobile Bay,      Ala.,      Committee resolu-
  Intracoastal    Water-       tion, Apr. 17, 1936.
  way.
Point Chugae, Dauphin        River and Harbor Act,       Apr. 14, 1937 ------------------                                     Do.
  Island, Ala., channel       Aug. 30, 1935.
  to; and channel to
  Indian Mounds, for
  harbor of refuge.
St. Joseph Bay, Fla_..._.    Rivers and Harbors          Dec. 10,1936        Rivers and Harbors                           Favorable.
                               Committee resolu-                               Committee, 10, 75th
                               tion, Mar. 20, 1936.                            Cong., 1st sess.
St. Marks River, Fla_..      Senate Committee res-       Jan.   7,1937     - - - - - - - - - -.   - - - - - - - - - - -   Unfavorable.
                               olution, Feb. 29,
                               1936.
Tombigbee and Ala-           River and Harbor Act,       Jan.   22, 1937 1....__._______..                                   Do.
  bama Rivers, to Per-         Aug. 30, 1935.
dido River, Ala. and
  Fla., waterway.
Tombigbee and Tennes-        Rivers and Harbors
see Rivers, waterway         Committee resolu-
connecting.                  tion, Feb. 27, 1934.
Valley Creek, Ala., to a     River and Harbor Act,
point at or near Birm-       Aug. 26, 1937.
ingham.
Warrior and Tombigbee        Rivers and Harbors
  Rivers, Ala. and Miss.       Committee resolu-
  (impounding dam no.         tion, Mar. 10, 1937.
  1, Sipsey Fork).
Warrior and Tombigbee        Rivers and Harbors
Rivers, Ala. and Miss.       Committee resolu-
  (lock and dam at mile       tion, Jan. 27, 1937.
227).
716       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
       FIRST NEW ORLEANS, LA., DISTRICT
   This district embraces the southern part of Louisiana, from Pearl
River on the east to Sabine River on the west, and south of Red
River, including the passes of the Mississippi River, that portion of
the river between New Orleans and Baton Rouge, La., insofar as the
removal of shoals obstructive to navigation is concerned, and that
portion of the Intracoastal Waterway, Mobile Bay, Ala., to New
Orleans, La., extending from the Inner Harbor Navigation Canal in
Lake Pontchartrain to Long Point Light in Lake Borgne.
   District engineer : Maj. Henry Hutchings, Jr., Corps of Engineers,
-to July 7, 1936; Lt. Col. R. W. Crawford since that date.
   Division engineer: Col. Francis B. Wilby, Corps of Engineers.
                                    IMPROVEMENTS

                                      Page                                      Page
1. Southwest Pass and South                 16. Bayou Grossetete, La _____      740
      Pass, Mississippi River,               17. Bayou Teche, La,,               742
      La------------                   716   18. The Louisiana and Texas
2. Mississippi River between                      Intracoastal     Waterway
      Baton Rouge and New                          from the Mississippi River
      Orleans, La-----------           724         at or near New Orleans,
3. Bayous LaLoutre, St. Malo                      La., to Corpus Christi,
      and Yscloskey, La ......         726         Tex. (New Orleans-Sabine
4. Bayou Dupre, La_____               727         River section)_              745
5. Intracoastal Waterway, Mo-               19. The inland waterway from
      bile Bay, Ala., to New                       Franklin to the Mermen-
      Orleans, La. (Inner Harbor                   tau River, La_               751
      Navigation Canal in Lake               20. Petit Anse, Tigre, and Car-
      Pontchartrain         to Long                lin Bayous, La_              755
      Point     Light in Lake                21. Waterway from White Lake
      Borgne section)-                 728         to Pecan Island, La__ _      757
6. Bayou Bonfouca, La ......          728   22. Mermentau River, Bayou
7. Bayou Lacombe, La .......          729         Nezpique, and Bayou des
8. Chefuncte River and Bogue                      Cannes, La_                  758
      Falia, La__----_--------         730   23. Bayou Plaquemine Brule,
9. Tangipahoa River, La     ----      731         La-----------------          760
10. Pass Manchac, La-                  732   24. Calcasieu River and Pass,
11. Tickfaw, Natalbany, Pon-                       La.                          760
      chatoula, and Blood Riv-               25. Lake Charles Deep Water
      ers, La--------------            733         Channel, La_____             763
12. Amite River and Bayou                    26. Vinton Waterway, La .....      764
      Manchac, La____                  735   27. Removing the water hya-
13. Barataria Bay, La_                 736         cinths, La_                  765
14. Bayou Lafourche, La ......         738   28. Examinations, surveys, and
15. Waterway from the Intra-                       contingencies (general) __   767
      coastal      Waterway      to          29. Other projects for which no
      Bayou Dulac, La. (Bayous                     estimates are submitted_     768
      Grand Caillou and Le-                  30. Plant allotment      _         768
      Carpe, La)_____________-         739   31. Design of Bayou Sorrel lock_   769

  1. SOUTHWEST PASS AND SOUTH PASS, MISSISSIPPI RIVER, LA.

  Location.-Southwest Pass is the westernmost of the mouths of the
Mississippi River. It flows in a generally southwesterly direction.
The entrance from the Gulf of Mexico is 114 miles from New Orleans,
La.; 160 miles from Mobile, Ala., on the east; and 330 miles from Gal-
veston, Tex., on the west. South Pass is the central one of the three
main mouths. It flows in a generally southeasterly direction. The
  RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                717
entrance from the Gulf of Mexico is 1071/2 miles from New Orleans,
La.; 141 miles from Mobile, Ala., on the east; and 349 miles from
Galveston Tex., on the west. (See U. S. Coast and Geodetic Survey
chart No. 1272.)
    Previous projects--(a) Southwest Pass.-Authorized by River and
Harbor Acts of July 4, 1836, March 3, 1837, August 30, 1852, July 8,
1856, March 2, 1867, and March 3, 1873. The cost and expenditures
were $1,729,988.53. For scope of improvements contemplated by
above acts see page 1847, Annual Report for 1915.
    (b) South Pass.-None.
    Existing project- (a) Southwest Pass.-This provides for a chan-
nel through Southwest Pass 1,000 feet wide and 35 feet deep. The
general plan of improvement approved in April 1923 provides for
contracting the lower 8.3 miles of the pass to a width of 1,750 feet by
means of jetties, spur dikes, and inner bulkhead; for dredging the
channel between the bulkheads and depositing the dredged material
between the bulkheads and jetties; for dredging a channel through the
outer bar inclining to the left of the jetty axis; for the construction of
small revetted openings through the narrow portions of the banks of
the pass for purpose of strengthening these banks; for closure of
minor outlets not required for maintenance of the banks; for the con-
struction of sills to prevent the enlargement of The Jump and Cubits
Gap; for dredging in the river at Head of Passes as far up as Cubits
Gap, a distance of 3.5 miles; for the construction of a sill across the
head of South Pass to limit the flow through that pass; for repairs
to sill across Pass a l'Outre and bank revetment at Head of Passes;
for construction of dikes with a view to reducing the width of the
river above Head of Passes; for the construction of a submerged de-
flecting dike above the Head of Passes; and for other minor work.
The plane of reference is mean low water. The east jetty is approxi-
mately 4.8 miles in length and the west jetty 3.8 miles. The jetties
are composed of a substructure of brush mattresses, originally built
to about the elevation of mean low water, surmounted with a super-
structure of concrete and large riprap. Spur dikes are composed of
cribwork of round piling filled with willows and stone, or with a
curtain of round piles along the upstream face.
    The estimate of cost for new work, revised in 1928, is $14,500,000,
exclusive of amounts expended on previous projects. The latest
  (1928) approved estimate for annual cost of maintenance is $415,000
for a channel width of 500 feet and $680,000 for a width of 1,000
feet.
    The existing project was adopted by the River and Harbor Act of
June 13, 1902, and provided that the details of the work may be modi-
fied at the discretion of the Secretary of War. (See H. Doc. No. 329,
56th Cong., 1st sess.; Annual Report, 1900, p. 2287, et seq.) The River
and Harbor Act of May 28, 1908, authorized dredging in the river at
the Head of Passes as far up as Cubits Gap. The River and Harbor
Act of March 3, 1909, made provision for increasing the plant by
addition of a large dredge. For report of the Board of Engineer
officers in 1916 see pages 2420-2426 of Annual Report for 1916. On
October 31, 1934, the Secretary of War authorized the further con-
traction of the lower mile of the jetty channel to a width of 1,420
feet by means of dikes, and the removal of the sill across the head of
718     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

South Pass. On September 20, 1935, the Secretary of War authorized
the construction of spur dikes at the head of Southwest Pass and the
construction of new dikes and extension of existing dikes on the east
bank of the Mississippi River at Pilottown, La. On July 22, 1936,
the Secretary of War authorized the construction of additional spur
dikes at the head of Southwest Pass and the construction of new dikes
and extension of existing dikes in the lower jetty channel, Southwest
Pass.
   For latest published chart see page 2372 of Annual Report for 1920.
   (b) South Pass.-The existing project authorized James B. Eads
and associates to construct such permanent and sufficient jetties and
auxiliary works as are necessary to secure and maintain for a period
of 20 years through the pass a channel 26 feet in depth and not less
than 200 feet wide at the bottom and having through it a central
depth of 30 feet, without regard to width; at the termination of the
maintenance period the channel to be maintained by the United
States; construction and maintenance of sill and submerged deflect-
ing dikes across head of South Pass and maintenance of sill across
Pass a l'Outre, removal of west dike, and construction of submerged
and spur dikes at Head of Passes; for dredging a channel 35 feet
deep, no width specified, through the shoals in the river between
Cubits Gap and Head of Passes, 31/2 miles; and for a seaward exten-
sion of the west jetty at mouth of pass. The east jetty foundation is
12,070 feet long. Inner east jetty is 11,170 feet long. The west jetty
is 7,820 feet long. Inner west jetty is 790 feet long. The jetties are
composed of a substructure of brush mattresses surmounted by a super-
structure of concrete. Auxiliary works are spur dikes and inner
jetties, which are composed of a cribwork of round piling filled with
willows and stone.
   The plane of reference is mean low water. Variation of water
surface is 16 inches at the mouths and 10 inches at the heads of the
passes, due to tides. The extreme range of tide at the mouths of
the passes is 28 inches.
   The amount paid James B. Eads and associates was $8,000,000,
being the total cost of new work. The latest (1928) approved esti-
mate for annual cost of maintenance is $150,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1875, amended by acts of June 19, 1878, and March 3,
1879. The Emergency Act of June 6, 1900, provided for the main-
tenance by the United States and appropriated a sum not exceeding
 $100,000 annually for this work. The River and Harbor Act of
May 28, 1908, authorized dredging in the river. The removal of
west dike and construction of spur dikes and bank revetment at
Head of Passes were based on the additional works planned in 1916
by the Board of Engineer officers appointed by the Secretary of
War for Southwest Pass (Annual Report for 1916, pp. 2420-2426).
On October 31, 1934, the Secretary of War authorized the removal
of the sill across the head of South Pass. The Permanent Appro-
priations Repeal Act of 1934, effective July 1, 1935, provides for
continuing maintenance operations with funds from regular annual
War Department appropriations. For latest published map, see
page 2656 of Annual Report for 1919.
  RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT             719

   Prior to the fiscal year 1936, the projects Southwest Pass, Missis-
sippi River, La., and South Pass Channel, Mississippi River, La.
 (maintenance), were reported upon as separate projects.
   Terminal facilities.-The Board of Commissioners of the Port of
New Orleans owns and operates the majority of the terminal facil-
ities of the port of New Orleans.
   The dock board has 3 fruit landings, equipped with 14 banana
unloaders, and other economical devices are included in the com-
modity-handling equipment of the port.
   All public port facilities are served by paved roadways and also
by the Public Belt Railroad, municipally owned and operated, which
connects with all 12 trunk lines entering New Orleans.
   The board has constructed a public cotton-handling terminal,
with a storage capacity of 461,856 high-density bales.
   There is one ship-side grain elevator with a total storage capacity
of 2,622,000 bushels.
    The board has constructed an Inner Harbor Navigation Canal.
The canal connects the Mississippi River with Lake Pontchartrain
and has a depth of 30 feet, referred to mean low Gulf level, and
bottom widths of from 125 to 300 feet.
    The dock board has constructed, on the Inner Harbor Navigation
Canal, a quay wharf of reinforced concrete. The wharf is 265 feet
wide by 2,400 feet long and is served on the front and rear by the
Public Belt Railroad and suitable city streets.
    Among other important port facilities at New Orleans may be
mentioned six floating drydocks, the largest having a capacity of
16,000 tons, the public coal and bulk commodity handling plant,
and the Army supply base, comprising three 6-story reinforced
concrete buildings, two of which are under lease by the dock board,
the third being utilized as a quartermaster storehouse.
    There are four railroad terminals on the Mississippi River, with
13,850 linear feet of wharves, of which 11,920 linear feet are covered
with sheds, affording 1,858,065 square feet of area.
    Most of the port's wharves are covered with transit sheds, afford-
ing an area of over 7,500,000 square feet.
    The facilities of the port of New Orleans are considered adequate
for its commerce. (For further details see Port Series No. 5, Corps
of Engineers.)
    Operations and results during fiscal year-(a) Southwest Pass.-
Work by hired labor and United States plant was confined to main-
tenance and consisted of the removal of 1,123,951 cubic yards from
the bar and lower jetty channels, 342,619 cubic yards from the en-
trance channel at the head of the pass, and 143,971 cubic yards from
the shoal area, mile 12.5 to mile 16, by the U. S. hopper dredge
Benyaurd; removal of 628,176 cubic yards from the shoal area be-
tween mile 12 and mile 14, and 217,287 cubic yards from the entrance
channel at the head of the passes by U. S. agitator dredge Lake
Fairfax; removal of 1,947,417 cubic yards from the shoal area be-
tween mile 12 and mile 15, and 74,053 cubic yards from the entrance
channel at the head of the passes by U. S. pipe-line dredge Wahalak;
maintenance of east jetty, spur dikes, inner bulkheads, outlets and
      20196-37-pt. 1--46
720               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

spillways, banks of the pass, and channel surveys, examinations, and
investigations, which cost as follows:
Dredging operations                   ----------------------------------                                      $270, 071. 31
Capping east jetty------------------------------------4,                                                            309. 63
Spur dikes-----------------------------                ----------------------                                   39, 270. 21
Inner bulkheads        ----------------------------------------                                                     707.65
Outlets and spillways-----------------------------------                                                            857. 08
Bank revetment-----------                       -------------------------                                       62, 799. 55
Surveys and investigations-------------------------------                                                       45, 291. 35
           Total----                     ----------------------------------------                             423, 306. 78
   Work by contract consisted of construction of dikes W. H. 5, W. H.
6, W. H. 7, and W. H. 8 on the east bank of the pass adjacent to the
West Headland dike, and the extension of dikes D, and E, and con-
struction of new dikes F, G, and H on the east side of the lower
jetty channel, at a cost of $103,265.63.
   (b) South Pass.-Operations during the year were confined to
maintenance. Work by hired labor and United States plant con-
sisted of maintenance of inner west jetty, east jetty longitudinal dike,
bank revetment and dikes at the head of the passes, which cost as
follows:
Inner west jetty-----------------------------------------                                                       $1, 666. 89
East jetty longitudinal dike-------------                         ------------------                            50, 710. 76
Bank revetment          ---------------------------------------                                                     119. 27
Dikes                          --------------------------------------                                               675. 77

           Total ----------------------------------------------                                                 53, 172. 69
   The total cost for the combined project (Southwest Pass and South
Pass) was $579,745.10, the total expenditures being $523,850.07, all
for maintenance.
   (c) Continuous water-level records were obtained at the lower end
of each pass, at the head of the passes, and at Pilottown. Average
observations of discharge of the three main passes taken through the
flood cycles are as follows:

                                                        1930     1931 1   1932     1933     1934 1   1935     1936     1937


Southwest Pass..............             ......          40.6    37. 95   40. 64   40. 25   40. 73   39. 96   37. 91   39.52
South Pass     ..........--------------------            17. 6   16. 90   17.00    17. 27   17. 16   17. 31   18. 07   17. 63
Pass a l'Outre......--------------------                 41.8    45. 15   42.36    42.48    42. 11   42.73    44.02    42. 85
       Total---------------..........................   100.0    100.0    100.0    100.0    100.0    100.0    100. 0    100.0

  1 Due to low river stages that existed during the 1931 and 1934 flood cycles, these observations were prob-
ably influenced by wind and tide to a greater extent than during other years.

   Condition at end of fiscal year--(a) Southwest Pass.-The existing
project is 93 percent completed. The jetties were completed to
present length in 1921. East jetty foundation is 25,400 feet long, and
the portion above high water is about 21,080 feet. The west jetty
is 19,960 feet long and has 19,000 feet above high water. Inner bulk-
heads were completed to present length in 1923.
   These lengths are: East bulkhead, 22,822 feet; west bulkhead,
15,080 feet. During the period 1908 to 1923 mattresses were added
to the sill at the head of Pass a l'Outre, mattress sills were placed
across Cubits Gap and The Jump, 11 outlet bayous in the pass
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                  721
were closed, the mattress sill across Southwest Pass was removed,
53 spur dikes were constructed in the lower 9 miles of the pass, and
5 spur dikes and a submerged deflecting dike were built at the head
of the passes. In the fiscal year 1935, six additional spur dikes were
built in the lower mile of the jetty channel to contract that channel
to a width of 1,420 feet. In the fiscal year 1936, three new dikes
were constructed at the head of the passes (Pilottown) and three of
the existing dikes in that area were extended; four short spur
dikes were constructed on the east side of the pass adjacent to the
West Headland dike separating Southwest and South Passes. In
the fiscal year 1937, four short new dikes were constructed on the
east side of the pass adjacent to the West Headland dike and down-
stream from the four constructed in the fiscal year 1936; two exten-
sions and three new spur dikes were constructed on the east side of
the lower jetty channel in an upstream direction from the fiscal
year 1935 dike construction. All structures are in good condition
with the exception of the dikes between the bulkheads and jetties,
which are no longer needed; certain of the spur dikes which have
become buried in the accretions they were designed to produce and
have served the purpose intended; the jetties which require some
reinforcement with riprap, and the dikes and bulkheads which re-
quire some repair by renewal of piling which have become unservice-
able. Channel conditions on June 30, 1937, were as follows:

                                                                                  35-foot channel
                                                                  Length                               Central
                                                                     of           Mini-                depths
                                                                  channel         mum-     Average
                                                                                  width     width


                                                                      Miles       Feet       Feet       Feet
Entrance channel into head of the pass.....------------------------      1. 0        500         900      36-50
Through pass from head to sea end of jetties...-------------------      19. 4        660      1, 000      35-50
Through bar channel at mouth of pass--   -----------------------.             8      820      1,000       37-50


   Throughout the length of the pass a 35-foot channel with an aver-
age width of 1,000 feet and a least width generally of not less than
600 feet was maintained during the year. The minimum width of
35-foot channel in the entrance at the head of the passes varied from
400 to 600 feet. The minimum width of 35-foot channel through
the bar channel at the mouth of the pass varied from 350 to 820
feet. The flood stage of the river reached 19.3 feet on the New
Orleans (Carrollton) gage on February 28, 1937.
   The work remaining to be done to complete the project consists of
a relatively small amount of dredging and possible addition of con-
trol works and contracting dikes at the head of the passes and in
the lower jetty channel.
    (b) South Pass.--Improvement begun by James B. Eads in 1875
comprised east and west jetties at the mouth, with lengths of 12,070
and 7,820 feet, respectively; 36 spur dikes between the jetties; 2
mattress sills and various dikes at the head of the passes; and
dredging the channel. These works were completed on July 8, 1879,
when the 20-year period of maintenance by contract was begun.
Two side outlets were closed, and spur dikes were built at two loca-
722      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

tions in South Pass. Inner east and west jetties, with lengths of
11,170 and 4,710 feet, respectively, were completed in 1886. The
Eads contract ended January 28, 1901.
   Since the latter date the pass has been maintained by the United
States. The work done includes a shoreward extension of 872 linear
feet to inner east jetty; maintenance placing of a mattress sill across
the head of South Pass, which was removed in 1935; an upstream
extension, 1,300 feet long, of the headland dike between South and
Southwest Passes; sinking of 232,742 square yards of mattress for
bank protection purposes at the head of the passes; construction of
spur dikes along the left bank above the head of the passes; and
placing of submerged deflecting dike across the head of Pass a
l'Outre. Throughout the year a channel of project dimensions was
maintained without addition or extensive repair to existing works.
On June 30, 1936, controlling channel conditions obtained at the
lower end of the jetty channel, where there was a channel 32 feet
deep with a minimum width of 530 feet.
   The total cost under the existing combined project (Southwest
Pass and South Pass) was $37,872,539.05, of which $8,765,000 for
South Pass and $13,533,513.33 for Southwest Pass, a total of $22,298,-
513.33 was for new work and $15,574,025.72 for maintenance. The
total expenditures have been $37,800,452.72.
  Proposed operations.-The balance unexpended at the end of the
fiscal year, $142,103.47, together with anticipated allotment                       of
$550,000, will be applied as follows:
Accounts payable June 30, 1937-------------------------------     $72, 086. 33
By hired labor and Government plant:
    Maintenance dredging by U. S. dredge Benyaurd in bar and
      lower channel at Southwest Pass, bar channel at South Pass,
      and entrance channel at Head of Passes, about 5 months, be-
      tween July 1, 1937, and June 30, 1938____________________ 125, 000.00
    Maintenance dredging in Southwest Pass between Head of
      Passes and lower jetty channel by U. S. pipe-line dredge
      Wahalak July 1-15, 1937     ______________----------                  12,500. 00
    Maintenance of jetties, dikes, spillways, and other structures,
     as required between July 1, 1937, and June 30, 1938     -----------
                                                                    102, 517. 14
    Hydraulic survey of passes throughout fiscal year        --______       40, 000. 00
    Examinations and surveys, as required during fiscal year_ ....  30, 000. 00
Maintenance by contract: Construction of brush-stone dike and
filling in with hydraulic dredge at mile 10 in Southwest Pass .-. 160, 000. 00

     Total, maintenance--------------------------------------     542, 103. 47
New work (by contract) : Construction of dikes at Southwest Pass_ 150, 000. 00
Actual construction will be deferred until the fiscal year 1939
   to permit the completion of hydraulic studies in progress.

      Total for project ----------------------------------------           692, 103. 47
  The additional sum of $700,000, together with the unexpended
balance of $150,000 for new work allotted during the fiscal year 1938,
can be profitably expended during the fiscal year 1939, as follows:
New work by contract: Construction of dikes in Southwest Pass_____ $150, 000

Maintenance dredging by U. S. dredge Benyaurd in bar and lower
jetty channel at Southwest Pass, bar channel at South Pass, and
in the entrance channel at Head of Passes, about 6 months, as re-
quired during the fiscal year____--    _.- _____________                     150, 000
Dredging in Southwest Pass by United States pipe-line dredge, 4
months, as required ______       _____         ___100,                            000
     RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                             723
Maintenance, by hired labor, of jetties, dikes, spillways, and other
  structures during the fiscal year as required -------- _----------- $275, 000
Examinations and surveys---------------
                             __-_________                   _           35, 000
Continuation of hydraulic survey of Passes throughout the fiscal
    year _____--_--_--_-             ___________-------------40,                                                                        000
Maintenance by contract: Construction of dike in Southwest Pass__                                                               100, 000

          Total, maintenance____________                                                                                        700,000
          Total all work_____________                                                                                           850, 000

                                            Cost and financial summary

Cost of new work to June 30, 1937_________________                                                                 $24, 028, 501. 86
Cost of maintenance to June 30, 1937_______________                                                                115, 574, 025. 72

     Total cost of permanent work to June 30, 1937_                                                                  39, 602, 527. 58
Minus accounts payable June 30, 1937_______________                                                                       72, 086. 33
     Net total expenditures__________________                                                                      139, 530, 441. 25
Unexpended balance June 30, 1937_____________-__                                                  .                     142,103.47

          Total amount appropriated to June 30, 1937_                                                              S139, 672, 544. 72



    Fiscal year ending June 30                   1933               1934                   1935               1936               1937


Cost of new work ... ... _ ....        ..     ...... .......-----
Cost of maintenance.........------------.    $469, 038. 46        $412, 063. 69       $713, 593. 06        $605, 599. 55       $579, 745. 10
Total expended-----------------               467, 134. 59        439, 089. 69        -163, 646. 19         628, 596. 99        523, 850. 07

Allotted-     -------------------
                 -_                     j     617, 078. 71        606, 151.77          -67, 005. 34         518, 871.52         180, 900. 00



Balance unexpended July 1, 1936_____________________________                                                               $485, 053. 54
Amount allotted from War Department Appropri-
ation Act approved May 15, 1936______________                                              $177, 900. 00
Amount allotted from War Department appropri-
   ation Act approved May 28, 1930_______________                                                 28, 000. 00
                                                                                                                            205 .of0     00

     Amount to be accounted for__                                                                                           690, 953. 54
Deductions on account of revocation of allotment _                                                                           25, 000. 00

      Net amount to be accounted for                                         --   -    -   -   -                            665, 953.54
Gross amount expended__________________                                        _____
                                                                                  -$526,                578. 58
Less reimbursements collected____________                                                             2, 728. 51
                                                                                                                            523, 850. 07
      Balance unexpended June 30, 1937_                                                                                     142, 103. 47
Outstanding liabilities June 30, 1937___                                                                                    131, 010. 37
     Balance available June 30, 1937_-------          ___--------                                                            11, 093. 10
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937___________-------------------                                                                   550, 000. 00
     Balance available for fiscal year 1938---------------                                                                  561, 093. 10
Amount (estimated) required to be appropriated for comple-
   tion of existing project 2___________________________________                                                           570,000. 00
Amount that can be profitably expended in fiscal year ending
                                   - -- -
June 30 1939, for maintenance 2_______________      ___                                                                    700, 000. 00
  x Includes $3,379,675.65 from permanent indefinite appropriations, "Maintenance,                                                  South
Pass Channel, Mississippi River."
2Exclusive of available funds.
724                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

2. MISSISSIPPI RIVER BETWEEN BATON ROUGE AND NEW ORLEANS,
                                                                                LA.

  Location.-The Mississippi River between Baton Rouge and New
Orleans flows in a general southeasterly direction through the south-
eastern portion of the State of Louisiana. Other data are as follows:

                                                                                                               Maximum       Minimum        Average

Width....................................................------------------------------------------.feet--          4, 700       1, 500           2, 90(
Discharge.......... ----------------------------------                 ....                second-feet_        1, 557, 000     135, 000
Fall of water surface (approximate)                                         ___--------------------- _feet..         27. 0          0. 5 ..----
Mean velocity (approximate)....                                    _ feet per second_
                                                          - -.............                                            9. 0          0. 5-


    (See Corps of Engineers Mississippi River Alluvial Valley maps,
Baton Rouge and White Castle quadrangles, and United States Geo-
logical Survey maps, Donaldsonville, Thibodeaux, Mount Airy, Bon-
net Carre, Hahnville, and New Orleans quadrangles.)
    Previous projects.-The improvement of this section of the river.
under the supervision of the Mississippi River Commission, was
authorized by the River and Harbor Act of June 3, 1896.
    Existing project.-This provides for a channel 35 feet deep at low
water and 300 feet wide between Baton Rouge and New Orleans, La.,
a distance of 132 miles, at an estimated annual cost of $14,000 during
years in which high floods occur.
    The existing project was adopted by the River and Harbor Act
approved January 21, 1927 (H. Doc. No. 105, 69th Cong., 1st sess.).
    Terminal facilities.-Modern terminal facilities were installed by
the city of Baton Rouge in 1926. A reinforced concrete dock for
deep-sea vessels 308 feet in length has a covered-shed area of approxi-
mately 20,000 square feet and is equipped with a 12-ton locomotive
crane. Attached to the downsteam end of the main wharf is a float-
ing wharf boat 231 feet by 401/2 feet, of 2,000-ton capacity. The
facilities are served by a transfer boat and municipal terminal, hav-
ing a capacity of 40 cars per day.
    The Standard Oil Co. of Louisiana owns and maintains a dock
approximately 2 miles above Baton Rouge, which is the highest point
on the Mississippi River, at which ocean-going vessels make regular
stops. Facilities are provided for handling oil and petroleum prod-
ucts to and from vessels.
    Other private terminals for handling oil and other products are
located at points on both sides of the river between New Orleans
and Baton Rouge.
    The port facilities are considered adequate for the commerce.
    Operations and results during fiscal year.-Operationsduring the
fiscal year were confined to maintenance, all by Government plant
and hired labor; 869,537 cubic yards were removed by United States
pump barge No. 2 from the channel at Red Eye Crossing, near
Brusly, La., 6 miles below Baton Rouge, La. The channel at Gra-
nada, La., 26 miles below Baton Rouge, La., did not require dredging
during the fiscal year. Surveys were made of the channel at Brusly
and Granada. The total cost of the work performed during the year
was $30,953.63, and the amount expended was $46,114.01, all for
maintenance.
     RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                       725
    Condition at end of fiscal year.-The existing project is for mainte-
nance. A channel of project width and depth was uniformly avail-
able throughout the year. The dredging operations performed at
Red Eye Crossing will provide for full project depth and width
at extreme low-water stage. The total cost under the existing project
to the end of the fiscal year was $167,966.45 and the amount expended
was $167,765.41, all for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $3,854.41, will be applied to payment of outstanding lia-
bilities and to maintenance dredging by the U. S. dredge Benyaurd,
as required.
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1939, to be applied to maintenance dredging by the
U. S. dredge Benyaurd, as may be necessary.
                                               Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937------------------------- $167, 966.45
      Total cost of permanent work to June 30, 1937------------- 167, 966. 45
Plus accounts receivable June 30, 1937 ___________________-___--238. 14

     Gross total costs to June 30, 1937-----------------------                                                       168, 204. 59
Minus accounts payable June 30, 1937_______________________                                                               439. 18

     Net total expenditures_                                                                                          67, 765. 41
                                                                                                                     1------------------------------
Unexpended balance June 30, 1937_-----------------------_--                                                            3, 854. 41

            Total amount appropriated to June 30, 1937______________                                                 171, 619. 82

           Fiscal year ending June 30                            1933           1934            1935         1936            1937


Cost of new work------------------------------------- -----------------------------
Cost of maintenance-----.--------------$7, 287. 41 $16, 86. 61-----------$45, 295. 14                                      $30, 953. 63
Total expended__------------------------                       18, 871. 66    16,086.61     ------------   29, 933.72       46, 114. 01
Allotted.........................-----------------------------. 19, 994. 85   10, 722. 83        $3, 000   29, 902. 14      30, 000. 00


Balance unexpended July 1, 1936 _______._________---_----                                                            $19, 968. 42
Amount allotted from War Department Appropriation
Act approved April 9, 1935_____--------------                                                      $5, 000.00
Amount allotted from War Department Appropriation
Act approved May 15, 1936---------      ------------                                               25, 000. 00
                                                                                                                         30, 000. 00
      Amount to be accounted for____   --
                                       __       --- ____ _________                                                       49, 968. 42
Gross amount expended ------------------------- $46, 114. 90
Less reimbursements collected----    __-------------      -     .89
                                                                                                                         46, 114. 01

      Balance unexpended June 30, 1937________________________                                                            3, 854. 41
Outstanding liabilities June 30, 1937 ________---_____-______-                                                               442. 42

     Balance available June 30, 1937 _____-________________                                                               3, 411. 99
Accounts receivable June 30, 1937-------------------------------                                                             238. 14

            Unobligated balance available June 30, 1937 ___ -____-----3,                                                    650. 13

Amount that can be profitably    expended - in- -fiscal year ending June
30, 1939, for maintenance1                                                                                              30, 000. 00
1
   Exclusive of available funds.
726      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

       3. BAYOUS LA LOUTRE, ST. MALO, AND YSCLOSKEY, LA.

   Location.-From their common head at the small settlement of
Yscloskey, Bayou La Loutre flows southeasterly for 29.4 miles to Eloi
Bay, and Bayou Yscloskey northeasterly for 2.2 miles to Lake Borgne.
Bayou St. Malo leaves Bayou La Loutre at mile 19.4, flowing north-
westerly 6.5 miles to Lake Borgne. (See U. S. Coast and Geodetic
Survey Charts Nos. 1270 and 1271, and U. S. Geological Survey maps
Yscloskey, Bayou Biloxi, Bayou Bernard, Lake Eugenie, Lake Eloi,
and Morgan Harbor, quadrangles.)
   Existing project.-This provides for a channel 5 feet deep and 40
feet wide from deep water in Lake Borgne to the shore line at the
mouth of Bayou Yscloskey; a channel 6 feet deep and 40 feet wide
from deep water in Lake Borgne through Bayous St. Malo, La Loutre,
and Eloi to deep water in Lake Eloi; and the removal of snags and
other obstructions from Bayou La Loutre between Hopedale and
Bayou St. Malo, the total length of the improvements being 30.0 miles.
The normal tidal variation is about 1 foot. Hurricane tides, 6 feet
above normal, have been reported.
   The estimated cost of new work made in 1937 is $48,000. The latest
 (1937) approved estimate for annual cost of maintenance is $8,400.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 275, 75th Cong. 1st sess.). The latest
published map is in the project document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests furnish, free of cost to the United States,
necessary rights-of-way and suitable spoil-disposal areas for new
work and for subsequent maintenance as required and improve
Bayous Yscloskey and LaLoutre from the Lake Borgne shore line to
Hopedale, and the Hopedale Canal, to provide a channel approxi-
mately 5 feet deep and 40 feet wide. It is expected that work neces-
sary to comply with these provisions will be begun immediately and
completed by July 1, 1938.
   Terminal facilities.-No terminal facilities exist.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing projects; on June 30, 1937, controlling depths at mean low
Gulf level were 5 feet at the mouth of Bayou Eloi; 1.8 feet in Bayou
LaLoutre; 1.6 feet over the bar at the mouth of Bayou Yscloskey;
and 6 feet through Bayou Saint Malo.
   Proposed operations.-No funds are available and no operations are
proposed during the fiscal year 1938.
   The sum of $48,000 can be profitably expended for new work during
the fiscal year 1939 as follows:
New work (by contract) :
   Dredging 5- by 40-foot channel at mouth of Bayou Yscloskey _____ $6, 000
   Dredging 6- by 40-foot channel through Bayou Saint Malo and
     through bar at entrance to bayou______     -     --
                                                   ________________  16, 000
   Dredging 6- by 40-foot channel in Bayou LaLoutre from Bayou Saint
     Malo to deep water in Bayou Eloi----------------------------- 25, 000
   Removal of snags and obstructions from Bayou LaLoutre from
     Hopedale to Bayou Saint Malo_________ ___,_                      1, 000
        Total --------------------
                                 ---                         ----     48, 000
  RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                        727
                         Cost and financial summary

Total amount appropriated to June 30, 1937-------------------------       -------

Amount (estimated)    required to be appropriated for completion     of
  existing project_______ ______________-____-___           .---   __-    $48, 000
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work--------------------------------------        --        48,000

                          4. BAYOU DUPRE, LA,

   Location.-Bayou Dupre has its head in the marshes 3 miles east of
the Mississippi River levee and extends east and north to its mouth
in Lake Borgne. The Lake Borgne Canal leaves the east bank of the
Mississippi iver through a lock at Violet, La., and joins Bayou
Dupre 3.6 miles above its mouth. (See U. S. Coast and Geodetic
Survey Chart No. 1270 and U. S. Geological Survey maps Chalmette
and Martello Castle quadrangles.)
   Existing project.-This provides for a channel 6 feet deep from
the highway bridge at Violet, La., to deep water in Lake Borgne
with widths of 80 feet in the canal and bayou and 100 feet in the
lake, and a turning basin 100 feet wide and 200 feet long at Violet,
La.; the length of the improvement being 7.3 miles. The mean range
of tide in Lake Borgne is 1.5 feet, with occasional variations, due to
winds, of 2 feet; hurricane tides of 6 feet have been reported.
   The privately owned lock at Violet has a usable length of 261 feet,
a width of 40 feet, and a depth of 6 feet over the sills. The cost of
this lock and the Lake Borgne Canal is not known.
   The estimated cost of new work made in 1937 is $52,000. The
latest (1937) approved estimate for cost of maintenance is $5,000
annually for the first 3 years and $3,500 annually thereafter.
   The existing project was adopted by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 321, 75th Cong., 1st sess.). The
latest published map is in the project document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests shall furnish free of cost to the United
States a right-of-way along the waterway 110 feet wide for a dis-
tance of 350 feet east of the highway bridge, thence 150 feet wide
for a further distance of 4,250 feet and 200 feet wide, thence to Lake
Borgne; provide an adequate public terminal, not less than 100 feet
wide and 300 feet long, on the canal at Violet, La., open to all on
equal terms; and give assurances satisfactory to the Secretary of
War that they will provide and maintain a least depth of 6 feet in
the Violet lock and its approaches, pass all Government-owned
craft through the lock without charge, and pass all other craft at
published rates not in excess of those deemed reasonable by the
Secretary of War. It is expected that the work necessary to comply
with these provisions will be begun immediately and completed by
March 1, 1938.
   Terminal facilities.-There is a. private wharf at Violet, La., used
by the shrimp and oyster cannery, and a switch track to the Loui-
siana Southern Railway. An additional area for a public terminal
is set aside under the provisions of local cooperation. These facili-
ties are adequate for existing commerce.
728        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done under the
existing project. On June 30, 1937, controlling depths at mean low
Gulf level were 2.5 feet through the lock, 6 feet through the canal
and bayou, and 3.2 feet over the bar at the mouth of the bayou.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  The sum of $52,000 can be profitably expended for new work
during the fiscal year 1939, to be applied to dredging under contract
a 6- by 80-foot channel from the highway bridge at Violet, La., to
Lake Borgne, and a 6- by 100-foot channel through the bar at the
mouth of Bayou Dupre.
                              Cost and financial summary

Total amount appropriated to June 30, 1937_---
Amount (estimated) required to be appropriated for completion of ex-
isting project __---           -
                         ______-__-_____----
                                         --                                           $52, 000
Amount that can be profitably expended in fiscal year ending June 30,
                      - --- --- -- --- -- --- -- -- --- -- -- --- -- -- --- --- -- --
1939, for new work 1                                                                  52, 000
  1 Exclusive of available funds.

5. INTRACOASTAL WATERWAY, MOBILE BAY, ALA., TO NEW ORLEANS,
   LA. (INNER HARBOR NAVIGATION CANAL IN LAKE PONTCHARTRAIN
   TO LONG POINT LIGHT IN LAKE BORGNE SECTION)

   For report on this improvement, see page 665.
                             6. BAYOU BONFOUCA, LA.

   Location.-This stream rises about 5 miles north of Slidell, La.,
and empties into Lake Pontchartrain 5 miles west-southwest of that
town. (See U. S. Coast and Geodetic Survey Chart No. 1268 and
U. S. Geological Survey topographic maps, Slidell and Chef
Menteur.)
   Existing project.-This provides for dredging a channel 10 feet
deep at mean low water and 60 feet wide on the bottom from Slidell
to deep water in Lake Pontchartrain, a distance of about 73/4 miles.
The average range of water level, due to tide, is 0.8 foot.
   The estimate of cost for new work, made in 1924, was $22,000, of
which $5,500 was contributed by local interests. The latest (1924)
approved estimate for annual cost of maintenance is $1,200.
   The existing project was adopted by the River and Harbor Act
approved January 21, 1927 (H. Doc. No. 474, 68th Cong., 2d sess.).
The latest published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-All terminal facilities are at Slidell and con-
sist of three loading slips and three wharves, with tram-track connec-
tions and skids for loading timber. There are also marine ways and
a graving dock. All terminal facilities are privately owned. They
are adequate for present commerce and may be enlarged and modern-
ized at moderate cost when required.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depths on June 30, 1937, were 8.7
feet through the bayou to upper end of the improvement and 10 feet
over the bar at the. mouth of the bayou. The channel is in good
condition.
    RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                     729
  The total costs and expenditures under the existing project were
$41,686.78, of which $36,497.27 was for new work and $5,189.51 for
maintenance. Of the amount expended for new work, $5,500 was
from contributed funds.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
  The sum of $6,000 can be profitably expended during the fiscal
year 1939 in dredging the bar channel in Lake Pontchartrain at the
mouth of the bayou with the U. S. pipe-line dredge Delatour during
the period April 1 to April 15, 1939.
                                     Cost and financial summary
Cost of new work to June 30, 1.937----------------------------                                    1$30,   997. 27
Cost of maintenance to June 30, 1937__                                                                 5, 189. 51
      Total cost of permanent work to June 30, 1937 ___________--36, 186. 78
Net total expenditures___________________________                136, 186. 78
Total amount appropriated to June 30, 1937_______________--       36, 186. 78


        Fiscal year ending June 30              1933            1934            1935       1936           1937


Cost ofnew work ....................... I..... !......... -- --- . ---
Cost ofmaintenance----------------------......................---.......
                                                                     -----$5, 189. 51
                                                          ..--------------
                                                                                             ---
                                                                                      ----------

Total expended      --------------------------------------------------                    5,189. 51
Allotted..........................       ....----------------------------
                                                              -- ------------
                                                --------........  ...........    $6,000   -810. 49



Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance _________________            _____                                         $6, 000. 00
1 In addition, $5,500 was expended from contributed funds for new work.


                                     7. BAYOU LACOMBE, LA.

  Location.--Bayou Lacombe rises in the southeastern portion of
St. Tammany Parish and flows in a southerly direction into Lake
Pontchartrain about 12 miles east of the Rigolets. (See U. S. Coast
and Geodetic Survey Chart No. 1269 and U. S. Geological Survey
Map, Slidell quadrangle.)
  Emxisting project.-This provides for a channel 60 feet wide and
8 feet deep through the entrance bar in Lake Pontchartrain and the
removal of snags and overhanging trees from the portion of the bayou
between the mouth and the fish hatchery, located about 8.2 miles above
the mouth. Under ordinary conditions the mean range of tide is
0.8 of a foot. The variation due to winds is from 3 to 6 feet.
   The estimate of cost for new work, revised in 1935, is $5,600 with
$900 annually for maintenance.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935, which provides for dredging and snagging (Rivers
and Harbors Committee Doc. No. 53, 72d Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-As the bayou cannot at present be navigated,
the wharves which were previously used at the sawmills have deteri-
orated badly. There are no other terminal facilities along the bayou;
however, the condition of the banks is such that handling facilities
could be constructed at reasonable cost as required.
   Operations and results during fscal year.-None.
730     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Condition at end of fiscal year.-No work has been done on the
existing project. The entrance from Lake Pontchartrain is ob-
structed by a sand bar, over which the controlling depth is about
3 feet. From mile 0 at its mouth to mile 8.2 the width of the bayou
ranges from 70 to 200 feet, and the depth ranges from 8 to 33 feet.
   Proposed operations.-The anticipated allotment of $5,600 will be
applied in new work dredging under contract during August 1937, to
provide a channel 8 by 60 feet over the bar at the mouth of the bayou.
This work is expected to complete the project.
   No additional funds can be profitably expended during the fiscal
year 1939.
                       Cost and financial summary
Cost of new work to June 30, 1937___
Cost of maintenance to June 30, 1937_____________________________
Net total expenditures-.________
Total amount appropriated to June 30, 1937

Amount (estimated) required to be appropriated for completion of exist-
ing project ____       ------------------------------------------ $5, 600

           8. CHEFUNCTE RIVER AND BOGUE FALIA, LA.

   Location.-The Chefuncte River rises in the upper portions of
Tangipahoa and Washington Parishes, La., and flows southerly into
Lake Pontchartrain, opposite New Orleans. (See U. S. Coast and
Geodetic Survey Chart No. 1269 and U. S. Geological Survey Map,
Covington quadrangle.)
   Previous projects.-Authorized by the River and Harbor Act of
June 10, 1872. The cost and expenditures were $5,221 for new work.
For further details of previous projects see page 731, Annual Report
for 1913.
   Existing project.-This provides for a channel 8 feet deep at mean
Gulf level from that depth in Lake Pontchartrain via Chefuncte
River and Bogue Falia to Washington Street, Covington, La. The
total length of improvement is 14 miles. Under ordinary conditions
the mean range of tide at the mouth is about 10 inches, and near
Covington about 3 inches, and the extreme range about 14 inches and
5 inches, respectively. The variation of water surface in the upper
Chefuncte River and Bogue Falia, due to floods, is about 8 feet; that
in the lower Chefuncte River at Lake Pontchartrain, due to winds,
is about 3 feet.
   The estimate of cost for new work, revised in 1927, was $8,460,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1881, which provided for dredging and removal of obstruc-
tions (H. Ex. Doc. No. 54, 46th Cong., 2d sess.), and the act of July
3, 1930, provided for the present dimensions of the channel (Rivers
and Harbors Committee Doc. No. 2, 70th Cong., 1st sess.). The
latest published map is printed opposite page 2437 of the Annual
Report for 1916.
   Terrminal facilities.-Terminalsare located at Madisonville. There
is no terminal at Covington. The banks in the upper courses are
    RIVERS AND HARBORS-FIRST                              NEW ORLEANS, LA., DISTRICT                                         731
generally firm and high and landings are made directly on the banks
in some of these places. Except at Covington, the terminals are
adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1929. The obstructions in the Chefuncte River and Bogue
Falia were originally removed in 1886 and the channel through the
bar was originally dredged in 1903. The controlling depths on June .
30, 1937, were 8 feet over the bar at the mouth of the Chefuncte
River, 10 feet in the river and in Bogue Falia to mile 13, and 3 feet
from mile 13 to Washington Street, Covington, La., available
throughout the year. The channel is in good condition.
   The total costs under the existing project have been $58,299.83, of
which $19,342.24 was for new work and $38,957.59 for maintenance.
The total expenditures were $58,299.83.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal
year 1939 in dredging the bar channel in Lake Pontchartrain at the
mouth of the river by the United States pipe-line dredge Delatour
during the period April 16 to 30, 1939.
                                     Cost and financial summary

Cost of new work to June 30, 1937----------------------------                                                   $24, 563. 24
Cost of maintenance to June 30, 1937                       ____----                                                38, 957. 59

      Total cost of permanent work to June 30, 1937-------------- 63, 520. 83
Net total expenditures--------------------------                  63, 520. 83
Total amount appropriated to June 30, 1937----------------------63, 520. 83


        Fiscal year ending June 30                1933                  1934             1935          1936                 1937


Cost of new work---        -----------         ----      ------------          -------                ----
                                                                                                    ---
Cost of maintenance      _...      _        ____
                                             __                                           $53. 35    $2, 587. 71

Total expended---------------------------------                    ------------            51.12      2,589.94
Allotted---------   ------------------------------------           $5,000.00 -----------            -2,358.94      -.....




Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------------------------------------                                                     $5, 000. 00

                                 9. TANGIPAHOA RIVER, LA.

   Location.-This river has its origin in the State of Mississippi and
flows in a generally southerly direction about 110 miles to Lake
Pontchartrain, La. (See U. S. Coast and Geodetic Survey Chart
No. 1269 and U. S. Geological Survey map, Ponchatoula quadrangle.)
   Existing project.-This provides for improvement, without dredg-
ing, by removing overhanging trees, snags, and obstructions for
distance of 531/2 miles above the mouth. The. variation of the water
                                                                                                                                   .a
surface, due to freshets, is from 3 to 20 feet in the upper reaches,
from 2 to 5 feet in the lower reaches, and from 2 to 4 feet in the
lower reaches due to tides and winds.
732                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimated cost of new work, made in 1878, was $10,700. There
is no approved estimate of cost for annual maintenance.
   The existing project was authorized by the River and Harbor Act
of June 10, 1872 (H. Ex. Doc. No. 54, 46th Cong., 2d sess.), and modi-
fied by the act of June 14, 1880. The latest published map is in
House Document No. 257, Sixty-sixth Congress, first session.
   Recommended modifications of project.-The project has been rec-
ommended for abandonment (H. Doc. No. 467, 69th Cong., 1st sess.).
   Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in 1884.
The controlling depths on June 30, 1937, were as follows: Over bar at
mouth, 2.1 feet; miles 0 to mile 8.8, 6.5 feet; mile 8.8 to mile 14.8, 2.3
feet; and unnavigable above this point. Except for the bar at the
mouth of the river, the channel is in good condition to mile 8.8 and
fair to mile 14.8.
   The total costs and expenditures were $18,944.73, of which $11,500
was for new work and $7,444.73 for maintenance.
   Proposed operations.-No funds are available and no operations are
proposed during the fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal year
1939 in removing snags in the lower 15.8 miles of the river by the
U. S. bucket dredge Grossetete during the month of December 1938.

                                                    Cost and financial summary

Cost of new work to June 30, 1937___________________________                                                              $11, 500. 00
Cost of maintenance to June 30, 1937   1______1_________                                                                    7, 444. 73
      Total cost of permanent work to June 30, 1937______-----  ___ 18, 944. 73
Net total expenditures------------------------------------------18, 944. 73
Total amount appropriated to June 30, 1937_______---------     -     8, 944. 73
                                                                    1_____


             Fiscal year ending June 30                            1933             1934           1935          1936              1937


Cost of new work ...................................... ............ ..........                               .........     .........
Cost of maintenance.................------------.....--.....------- ---------- $5,086. 59
Total expended--.....................---------------....----...      $7.32 ------------........   5, 086. 59 -.-----.....     ---....--.

Allotted             ------------------------                     1,141.86       $5,000.00           86. 59



Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance----------------------------------------        $5, 000. 00

                                                      10. PASS MANCHAC, LA.

   Location.-Pass Manchac is a tidal pass or bayou which rises in
Lake Maurepas and flows in a general easterly direction into Lake
Pontchartrain at a point 29 miles from New Orleans. (See U. S.
Coast and Geodetic Survey Chart No. 1269, and U. S. Geological
Survey Map, Pontchatoula quadrangle.)
   Existing project.-This provides for the removal of snags, logs,
etc., throughout the pass, which is 7 miles long, and from the bars
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                          733
at the entrance into the pass. Under ordinary conditions the mean
range of tide is about 10 inches and the extreme range about 14
inches. At times high winds may cause a rise of about 4 feet. The
estimate of cost for new work, made in 1910, was $6,000, and $250
for annual maintenance.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 882, 60th Cong., 1st sess.). The latest
published map is printed opposite page 2436 of the Annual Report
for 1916.
   Terminal facilities.-There are no terminal facilities.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1912. The controlling depths on June 30, 1937, were 7 feet
through the pass and through the north channel of the pass, and 6
feet through the other channels. The channel is in good condition.
   The total costs and expenditures under the existing project to the
end of the fiscal year were $10,886.32, of which $1,374.10 was for new
work and $9,512.22 for maintenance.
   Proposed operations.-There are no funds available and no opera-
tions proposed during the fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal
year 1939 in dredging the bar channels in Lake Pontchartrain and
Lake Maurepas at the ends of the pass by the United States pipe-line
dredge Delatour during the period May 1 to May 15, 1939.
                                 Cost and financial summary

Cost of new work to June 30, 1937-------------------------------                                                $1, 374. 10
Cost of maintenance to June 30, 1937-----------------------------                                                9, 512. 22

      Total cost of permanent work to June 30. 1937 ________-__ 10, 886. 32
Net total expenditures-----------------------------------------  10, 886. 32
Total amount appropriated to June 30, 1937-----      -           10, 886. 32
                                                          -______-_

        Fiscal year ending June 30                 1933             1934             1935             1936              1937

Cost of new work---                                ----------------..............................--............................--
Cost of maintenance..-----------------      -,---.------ .- --------------      ,               $4,980.86         ----------
Total expended--------    ---------------             $5.77 ---------------------                   4, 980.86 -----------
Allotted..---.-----------------------             -248.04 ------------            $5,000.00           -19. 14     ...........



Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance-__-__     - ______-______
                                         --             _ _...$5,                                                        000.00

11. TICKFAW, NATALBANY, PONCHATOULA, AND BLOOD RIVERS, LA.

  Location.-Natalbany and Blood Rivers are tributaries of Tickfaw
River; Ponchatoula River is a tributary of Natalbany River.
  Tickfaw River rises in the extreme southwestern part of the State
of Mississippi and flows in a southerly direction to Lake Maurepas,
a distance of about 105 miles.
  Natalbany River flows in a generally southerly direction and dis-
charges into Tickfaw River about 2 miles above its mouth.
734      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Ponchatoula River flows in a southerly and southwesterly direction,
and discharges into Natalbany River about 33/4 miles above its
mouth.
   Blood River is a small stream flowing in a southeasterly direction
and discharging into Tickfaw River about 712 miles above its mouth.
 (See U. S. Coast and Geodetic Survey Chart No. 1269 and U. S.
Geological Survey Maps, Springfield and Ponchatoula quadrangles.)
   Eixsting project.-This provides for the removal of obstructions
in the Tickfaw River from its mouth to a point 26 miles above, on
the Blood River from its mouth to the head of navigation, about 4
miles, and on the Natalbany and Ponchatoula Rivers for a distance of
151/2 miles, the total length of improvements being 4514%miles. Under
ordinary conditions the mean range of tide is about 10 inches at the
mouth of the Tickfaw River and about 3 inches at the head of navi-
gation on each stream. The extreme variation of water surface due
to freshets is about 9 feet in the upper reaches of all streams and
about 30 inches at the mouth of the Tickfaw River.
   The estimate of cost for new work made in 1881 was $10,230.
There is no approved estimate of cost for annual maintenance.
   The existing project was adopted by the River and Harbor Act of
March 3, 1881 (H. Ex. Doc. No. 54, 46th Cong., 2d sess., and Annual
Report for 1880, p. 1182). The latest published map is printed oppo-
site page 2439 of the Annual Report for 1916.
   Terminal facilities.-There are a number of small private wharves
on each of these streams, and all the unloading is done by hand. The.
terminal facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1921. The controlling depths, mean low Gulf, on June 30,
1937, and available throughout the year were: Tickfaw River, 6
feet on bar at entrance; 18 feet to mile 8; 6.4 feet from mile 8 to mile
18.8, and not navigable above mile 18.8; Natalbany River, 8 feet to
mile 10; Ponchatoula River, 14 feet to mile 4; Blood River, 10 feet
to mile 4. Mile 0 is at the mouth of the stream in each case. Ex-
cept for the bar at the entrance from Lake Maurepas, the streams
are in good condition. Head of navigation for boat traffic on Tick-
faw River is at mile 18.8; on Natalbany, at mile 10; and on Poncha-
toula and Blood Rivers, at mile 4.
   The total costs and expenditures were $31,925.44, of which $8,115.49
was for new work and $23,809.95 for maintenance.
   Proposed operations.-There are no funds available and no opera-
tions proposed during the fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal
year 1939 in removing snags in the river channels by the U. S. bucket
dredge Grossetete during the month of January 1939.
                         Cost and financial summary
Cost of new work to June 30, 1937      ---------------------------- $8, 115. 49
Cost of maintenance to June 30, 1937-- __      _________-_______-23, 809. 95
      Total cost of permanent work to June 30, 1937-------     __    31,925.44
      Net total expenditures   -------------------                   31,925.44
      Total amount appropriated to June 30, 1937.----------          31, 925.44
    RIVERS         AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                          735


           Fiscal year ending June 30              1933           1934         1935        1936        1937


Cost of new work-------                 ------------        ------------------------------------------
Cost of maintenance                                    --------------  --- $3,996.67 --
Total expended                                          $1.07 ------------    3, 996. 67     --   --

Allotted            -                     - --         166.83      $5,000    -1, 003. 33-- ----------------


Amount that can be profitably expended in fiscal year ending June
   30, 1939,       for    maintenance ___------------------
                                       -_                                                          $5,000. 00

                     12. AMITE RIVER AND BAYOU MANCHAC, LA.


   Locatio.-Bayou Manchac is a tributary of Amite River. Amite
River has its origin in the State of Mississippi, and flows in a gen-
erally southerly direction about 170 miles to Lake Maurepas, La.
Bayou Manchac has its origin in Iberville Parish, La., and flows
eastwardly about 18%4 miles, discharging into Amite River about
353/ miles above its mouth. (See U. S. Coast and Geodetic Survey
Chart No. 1269 and U. S. Geological Survey maps Springfield and
Denham Springs quadrangles.)
   Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, August 11, 1888, and July 13, 1892. Prior to the adoption
of the existing project in 1927 the cost and expenditures were
$84,143.84, of which $24,900.82 was for new work and $59,243.02
for maintenance. For further details see page 830 of Annual Report
for 1926.
   I:/istii.r project.-This )rovides for a channel 60 feet wide and
7 feet deep at mean low water, from that depth in Lake Maurepas
to Port Vincent, and for the removal of obstructions between that
point and the bridge of the Louisiana.Railway & Navigation Co.
across Bayou Manchac. The total length of improvement is44 miles.
   Under ordinary conditions the mean range of tide in Amite River
is about 10 inches at the mouth and about 4 inches in Bayou Man-
chac, the extreme ranges being about 14 and 6 inches, respectively.
A variation of water surface of from 6 to 12 feet sometimes occurs
in the upper A'mite and Bayou Manchac, due to freshets. A rise of
30 inches in the lower Amite is sometimes caused by high winds.
   The estimated cost of new work, made in 1924, was $5,000, exclu-
sive of amounts expended on previous projects, with average annual
maintenance of $1,200.
   The existing project was authorized by the River and Harbor Act
of January 21, 1927 (H. Doc. No. 473, 68th Cong., 2d sess.). The
latest published map is in the project document.
   Terminal faacities.-There is a small warehouse at Clio and one
at Port Vincent, and a small wharf at Maurepas. In the upper
reaches where the banks are high, landings are made on the bank.
   The terminals are considered adequate for the existing commerce.
There are no wharves open to the public.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1928. The controlling depths, mean low Gulf, on June 30,
      20
         96--37--pt. 1--47
736               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

1937, were as follows: Amite River, 7 feet on bar at entrance and up
to mile 36; Bayou Manchac, 5 feet on bar at mouth and 6 feet to
Ward Creek at mile 8. Mile 0 is at mouth of stream in each case.
With the exception of the bar at mouth of Bayou Manchac, which
is liable to reform after each freshet, channel'conditions are good
over the project distance. Above the mouth of Bayou Manchac
the Amite River is badly obstructed and has fallen into disuse.
   The total costs under the existing project to the end of the fiscal
year were $6,063.47, of which $3,332.86 was for new work, and
$2,730.61 for maintenance.
   Proposed operations.-There are no funds available and no opera-
tions proposed during the fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal
year 1939 in removing snags in the river and bayou by the U. S.
bucket dredge Grossetete during the month of February 1939.
                                         Cost and financial summary

Cost of new work to June 30, 1937___________________                                                   ------             $28, 233. 68
Cost of maintenance to June 30, 1937------------------__                                                                   61, 973. 63
      Total cost of permanent work to June 30, 1937-------------                                                              90, 207. 31
Net total expenditures------------------------
Total amount appropriated to June 30, 1937---------------------
                                                                                                                              90, 207. 31
                                                                                                                              90, 207. 31

           Fiscal year ending June 30                    1933                 1934            1935               1936               1937

Cost of new work                                                   -                                                                 -
Cost of maintenance_ ----                                              -------------

Total expended .....                                      $13.01          ------------

Allotted ..-........-       -..   ....   _ ...   . --   1,850.40- .            .       .   .-------------------------------



Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ---------------------------------                                                                  $5, 00(). 00
                                         13. BARATARIA BAY, LA.

     Location.-This waterway is in Jefferson Parish, La., and extends
about 37 miles in a generally southerly direction from the junction
of Bayou Villars and Big Barataria Bayou, through Big Barataria
Bayou, Bayou Dupont, a canal (Dupre Cut) through the marsh,
Bayou Cutler, Bayou St. Denis, and Barataria Bay to the east end
of Bayou Rigault, at Grand Isle, and connects with the Gulf of
Mexico through Grand Pass.                               (See U. S. Coast and Geodetic Survey
Chart No. 196 and U. S. Geological Survey maps, Barataria, Creole,
and Fort Livingston quadrangles.)
  Existing project.-This provides for dredging a channel 5 feet
deep at mean low Gulf level and 50 feet wide on the bottom from
the junction of Bayou Villars and Big Barataria Bayou to Grand
Isle, a distance of about 37 miles. The Secretary of War is author-
ized, in his discretion, to change the location of the route and increase
the dimensions of the channel if the esuinated cost of the ilnitro-e-
ment to the United. States is not increased thereby.                                                       Under ordinary
conditions the mean range of tide is 12 inches at the mouth and zero
    RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                       737
at the head, and the extreme range 24 inches and 12 inches, respec-
tively. The variation of water surface near the mouth, due to hurri-
canes, has been as high as 6 feet.
    The estimated cost of new work, for a canal 5 by 40 feet along route
no. 6, revised in 1924, was $87,500. The latest (1928) approved esti-
mate for annual cost of maintenance is $5,000.
    The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. DI)oc. No. 200, 65th Cong., 1st sess.). The only
published map is in that document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-Traffic on the waterway in question is mainly
tributary to New Orleans.
    On Bayou Barataria the only public wharf is at Lafitte, this being
open to all commerce without charge.
    At Grand Isle, a truck-gardening community, a navigation dis-
trict has been organized for the purpose of constructing a canal and
wharves to facilitate the handling of the products, to be open to.
all on equal terms, with charges only sufficient to pay for the work.
    The terminals are considered adequate for the existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1925 at a saving of $14,462 under the estimated cost. The
controlling depths at mean low Gulf on June 30, 1937, were: In Big
,.Barataria, 12.7 feet; in Bayou Dupont, 7.6 feet; in Dupre Cut, 6.5
feet; in Bayou Cutler, 6.0 feet; in Bayou St. Denis, 6.5 feet; in Bara-
taria Bay, 5.1 feet; available throughout the year.
    The total costs and expenditures were $106,429.11, of which $73,-
037.11 was for new work and $33,3 92 for maintenance.
   Proposed operations.- There are no funds available and no opera-
tions proposed during the fiscal year 1938.
   The sum of $20,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging in Dupre Cut and in Barataria
Bay at the entrance to Bayou St. Denis by one United States pipe-
line dredge during the months of July and August 1938.
                                                   Cost and financial summary
Cost of new work to June 30. 1937----------------------------                                                       $73, 037.11
Cost of maintenance to June 30, 1937-------------------------                                                        33, 392.00
      Total cost of permanent work to June 30, 1937------------106, 429. 11
Net total expenditures----------------------------------------- 106,429.11
Total amount appropriated to June 30, 1937-------------------   106, 429.11


           Fiscal year ending June 30                            1933           1934         1935            1936        1937


Cost of new work----
                                                      .--------
                                                               -----------------------
                                                                     $-63 :_----:-
                                                                                           ---------- ---------
                                                                                           $9, 031. 12       -
                                                                                                                      -----
Cost of maintenance
                 . .               .   .       .                    $5.



Total expended--      ------               ------                 326. 24 --    -      -    9, 031. 12   -      -
Allotted    ..   . -------     -       -   -        ---      -    183. 77      $10, 000     -968. 88



Aiount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance __    ____       ___________           $20, 000. 00
738      REPORT OF (CHIEF O     ENGINEERS,      iS. 'ARMY,   9~7

                     14. BAYOU LAFOURCHE, LA.

   Location.-Prior to 1.902 Bayou Lafourche was; an outlet of the
Mississippi River, its head being at Donaldsonville, La., 80 miles above
New Orleans. It flows in a general southerly direction to the Gulf of
Mexico, a distance of 107 miles. (See U. S. Coast and Geodetic Sur-
vey Chart No. 196 and U. .S. Geological Survey map, Donaldsonville,
Thibodaux, Houma, Lake Felicity, Creole, and Chenier-Caminada
quadrangles.)
   Previous projects.-Authorized by River and Harbor Acts of June
18, 1878, and August 11, 1888. The total expenditures were $268,-
380.86, of which $252,935.48 was for new work and $1.5,445.38 for
maintenance. For further details see page 850 of Annual Report for
1915 and page 833 of Annual Report for 1925.
   Existing project.-This provides for the permanent closure of the
head of the bayou, without a lock; for a channel 6 feet deep and 60

,port;
feet wide from Napoleonville to the intracoastal waterway at Lock-
       and a channel of same dimensions from the intracoastal water-
way at Larose to the Gulf of Mexico via Pass Fourchon; the closure
of Belle Pass and for a jettied entrance at the mouth of Pass Four-
chon. The project is subject to modification at the discretion of
the Chief of Engineers with respect to selection of the outlet pass to
be improved. The total length of improvement is about 79.25 miles.
Under ordinary conditions the mean range of tide is about 3 inches at
the head and 10 inches at ,the mouth of the bayou. Tropical hurri-
canes have been known to cause a variation of 10 feet at the mouth
and severe rains and overflow have caused a variation of 3 to 10 feet
at the head.
   The estimate of cost for new work revised in 1935, is $351,000. The
latest (1935) approved estimate of cost for annual maintenance is
$13,600.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. No. 45, 73d Cong., 1st sess.). Thelatest
published map is in the project document.
   Local cooperation.-Spoil-disposal areas have been procured by
local interests and papers submitted to the Department for approval.
   Terminal facilities.-There are numerous private warehouses and
wharves and stiff-leg derricks for handling cane along the bayou.
At Thibodaux a large wholesale company has a dock, freight trans-
fer, and warehouses on the bayou bank. The Gulf Refining Co. also
has a private dock. At Lockport the Barker Barge Line has a large
wharf with covered shed, and the Southern Pacific Railroad main-
tains a large wharf with covered shed. At Golden Meadow each of
the sea-food canneries has docking facilities suitable for their needs.
The terminal facilities are considered adequate.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-Necessary easements have been
obtained for spoil-disposal areas and specifications prepared. The
work yet to be done consists of dredging the project channel and con-
struction of the jetties. The controlling depths on June 30, 1937,
were 2.5 feet in the upper section of the bayou, and 3 to 6 feet in the
lower section. The depth over the bar is about 1.5 feet.
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                          739

  Proposed operations.-The anticipated allotment of $120,000 will
be applied as follows:
New work (by contract)
   Construction of a breakwater at the mouth of the pass selected
     for improvement_-------------_------                          $78, 000
   Dredging a channel 6 feet deep by 60 feet wide from the Gulf to
     the vicinity of the Havoline Canal_ ________                   42, 000

        Total------------------------------___   ----------------------    120,000
  Bids will be opened by January 15, 1938: the work commenced
by February 15, 1938, and continued throughout the remainder of
the fiscal year.
  The additional sum of $231,000 can be profitably expended during
the fiscal year 1939 as follows:
New work (by contract) :
   Dredging a channel 6 feet deep by 60 feet wide from the vicinity
     of the Havoline Canal to Larose, La-------------------         $35, 000
   Dredging a channel 6 feet deep of minimum practicable width
     (about 50 feet) from Lockport to Napoleonville---------------  196, 000
             ---------------------------------------------------
         Total_                                                             231,000
  This work will provide for completion of the project.
                              Cost and financial summary
Cost of new work to June 30, 1937                                --   $--------------------
                                                                      $252,  935. 48
Cost of maintenance to June 30, 1937----------------------------         15, 445. 38
      Total cost of permanent work to June 30, 1937                    268, 380. 86
Net total expenditures----------------------------------------         268, 380. 86
Total amount appropriated to June 30, 1937-                            268, 380. 86
Amount (estimated) required to be appropriated for completion
of existing project------------------------------------------         231, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work                         -   -                 231, 000.00

15. WATERWAY         FROM THE INTRACOASTAL WATERWAY TO BAYOU
     DULAC. LA. (BAYOUS GRAND CAILLOIT                   AND LE CARPE, LA.)

  Location.-Bayou LeCarpe is a tidal stream which rises about 1.5
miles southeast of Houma in Terrebonne Parish and flows southerly
into Bayou Pelton, thence into Bayou Grand Caillou, which flows
southwesterly into Caillou Bay, a total distance of about 40 miles.
 (See U. S. Coast and Geodetic Survey Chart No. 1116 and U. S.
Geological Survey maps Houma, Dulac, and DeLarge quadrangles.)
   Existing project.-This provides for a waterway 5 feet deep and
40 feet wide from the intracoastal waterway at Houma through
Bayoui LeCarpe, Bayou Pelton, and Bayou Grand Caillou to Bayou
Dulac, about 16.3 miles. The normal fluctuation due to tides is 3 to
10 inches, but winds may raise or lower the water level 1 to 3 feet.
   The estimate of cost of new work, revised in 1935, is $56,250. The
latest (1935) approved estimate for annual cost of maintenance is
$3,000.
   The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (H. Doc. No. 206, 72d Cone., 1st sess.).
The project document contains the latest published map.
740      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Local cooperation.--Fully complied with.
   Terminal facilities.-There are several private wharves and a num-
ber of stiff-leg derricks for handling cane along the banks of the
waterway, which are considered adequate for prospective commerce.
  Operatons and results,.during.fiscal year..--None.
  Condition at end of fiscal year.-Rightsof-way and spoil-disposal
areas have been obtained and accepted by the Department, but no
work has been done. The controlling depths on June 30, 1937, were:
Bayous LeCarpe and Pelton, 4 feet; Bayou Grand Caillou, 3.5 feet.
  Proposed operations.-The sum of $56,250 allotted during July
1937 will be expended during the fiscal year 1938, in dredging a
5- by 40-foot channel by contract from the intracoastal waterway
to Bayou Dulac during the period November 1, 1937, to Jue 30,
1939.
                                 Cost and financial s,4linglryi

Cost of new work to June 30, 1937------------------                         -----
Cost of maintenance to June 30, 1937------------------------

      Net   total   expenditures_________              __________   __     ------
Total amount appropriated to June 30, 1937---------------------------    -------

Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937                                              250
                                                                $----------------
Amount available for fiscal year 1938_                       __ 56, 250

                             16. BAYOU GROSSETETE, LA.

  Location.-This bayou rises in Pointe Coupee Parish, La., and
extends in a generally southeastern direction, entering Bayou Plaque:
mine 8 miles below Plaquemine Lock. (See U. S. Coast and Geodetic
Survey Chart No. 1116 and Corps of Engineers, "Mississippi River
Alluvial Valley" maps Fordoche, Oscar Bayou, and Grossetete quad-
rangles. )
  Existing project.-This provides for improving the stream for a
distance of 29 miles from its mouth to a point 5 miles above Marin-
gouin, La., by removing snags and trees and by dredging a channel
60 feet wide on bottom and 5 feet deep at mean low water. Mean low
water is 2 feet above mean low Gulf level. Under ordinary conditions
the mean range of tide is about 3 inches at the mouth and nothing at
the head, and the extreme range about 6 inches at the mouth: The
variation of water surface due to flood conditions may be from 2 to
8 feet.
  The estimate of cost for new work, revised in 1932, is $130,000.
The latest (1912) approved estimate for annual cost of maintenance
is $500.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 348, 62d Cong., 2d sess.). The latest
published map is printed opposite page 2540 of the Annual Report
for 1917.
   Terminal facilities.-There are no wharves on the bayou. The
banks are firm and high. The steamboats and launches operating on
the stream unload their cargoes at any desired point, carrying the
freight by hand into the stores, which are generally on the bank of
the bayou. The facilities are considered adequate for the existing
commerce.
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                      741
   Operations and results during fiscal year.-A preliminary survey
was made to determine the localities for maintenance dredging. The
total costs were $866 27, all for maintenance. The expenditures were
$832.07.
   Condition at end of fiscal year.-A channel 5 feet deep at mean low
Wvater:id:      feet wide on the bottom was completed in 1914 to mile
10.3, and from that point to the head of the project a 5- by 40-foot
channel was dredged in 1916 and redredged in 1923. The existing
project is 15.8 percent complete, that portion of the stream above mile
10.3 remaining to be dredged 20 feet wider. The controlling depths
at mean low water on June 30, 1937, were: From mouth (mile 0) to
mile 10, 6 feet; mile 10 to mile 18. 5.7 feet; mile 18 to mile 26, 4.2 feet;
and mile 26 to mile 29 at head of navigation the bayou is blocked
solidly with logs, debris, and marine growth.
   The total costs under the existing project to the end of the fiscal
year were $71,436.54, of which $29,392.49 was for new work and
$42,044.05 for maintenance. The total expenditures were $71,402.34.
   Proposed operations.---The balance unexpended at the end of the
fiscal year, $167.93, together with an allotment of $50,600 made dur-
ing July, will be applied to maintenance dredging estimated to cost
$10,000, by the U. S. bucket dredge Grossetete during the period
October 15, to December 15, 1937.
   The expenditure of the balance of the allotment of $50,600 for
new work in widening the channel above mile 10.3 will be deferred
pending determination of the needs of existing and reasonably pros-
pective commerce.
   The additional sum of $10,000 can be profitably expended during
the fiscal year 1939, to be applied to maintenance and snagging by
the U. S. bucket dredge Grossetete.
                                      Cost and financial summary
Cost of new work to June 30, 1937                                                                             $29,392.49
Cost of maintenance to June 30, 1937_                                                                          42, 044.05
     Total cost of permanent work to June 30, 1937--________                                                      71, 436. 54
Minus accounts payable June 30, 1937----------------                                                                   34. 20

        Net total        expenditures_                 -                                             -            71, 402. 34
Unexpended &balance June:.,30, 1937___                                                                                167.93

        Total amount appropriated to June 30, 1937----------------71, 570. 27


        Fiscal year ending June 30                   1933             1934              1935         1936              1937


Cost of new work                      ------------          -----    --------          ------------------          -----
Cost of maintenance___   ----------       -     ------------        $8, 388. 95 -$9,     351.82     $966. 60               $866. 27
Total expended     ---------------------------------                 8, 388. 95        9,351.82         966. 60             832. 07
Allotted------------------------------                              18, 388.95         -648. 18    10,966.60         -9,000.00


Balance unexpended July 1, 1936____________-______________ _ $10,000.00
Deductions on account of revocation of allotment-----------------9, 000. 00
      Net amount to be accounted for------------__                                                                 1,000. 00
Gross amount expended-----    -   - __     --     -                                            -   --                832. 07
        Balance unexpended June 30. 1937---
                                         ...                                                                          167.93
742                REPORT OF CHIEF OF ENGINEERS, U.                             S.    ARMY, 1937

Outstanding liabilities June 30, 1937                                   -----------                  $100.00

     Balance available June 30, 1937----------------       --                                            67.93
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------------                                     50, 600. 00

    Balance available for fiscal year 1938---------------------50, 667.93
Amount (estimated) required to be appropriated for completion
    of existing                 project 1    _------------                                         60, 000.00
Amount that can be profitably expended in fiscal year ending June
    30, 1939, for maintenance 1--                               -----                              10, 000. 00
    1 Exclusive of available funds.

                                             17. BAYOU TECHE, LA.

   Location.-Bayou Teche has its source in Bayou Courtableau, in
St. Landry Parish, and flows in a southeasterly direction, a distance
of 125 miles, to where it joins the lower Atchafalaya River, about
101/2 miles above Morgan City, La. (See U. S. Coast and Geodetic
Survey Chart No. 1116 and Corps of Engineers' Mississippi River
Alluvial Valley maps of Palmetto, Opelousas, Garencro, Arnaud-
ville, St. Martinville, Loreauville, Derouen, J eanerette, Foster, and
Belle Isle quadrangles.)
   Previous project.-Authorized by River and Harbor Acts of July
11, 1870, and September 19, 1890. The cost and expenditures were
$45,704.43. For further details, see page 1851, Annual Report for
1915.
   Existing project.-This provides for a channel 8 feet deep and 80
feet wide on the bottom from the mouth of the stream to New Iberia,
La., 54.5 miles, thence 6 feet deep and 60 feet wide on the bottom to
Keystone lock, 18 miles, and thence 6 feet deep and 50 feet wide on
the bottom to Arnaudville, La., 34 miles, to be secured by dredging,
removing snags and overhanging trees, and construction of a lock
and dam and regulating works. The plane of reference is mean
Gulf level.
                                                       Keystone lock
Distance from New Iberia                ...............                                   18 miles.
Distance from Intracoastal Waterway ---------------------                                 82.5 miles.
Width           of chamber              --    --                                          36 feet.
Length available for full width___                        160 feet.
Lift----------                                            8 feet.
Depth on miter sill at mean Gulf level---------------       Do.
Character of foundation---------------------------------Timber piles.
Kind of dam-----------------------------------           .Timber, . rock-fill.
Type of construction-------------------------------       Concrete.
Year completed---                                             ---                         1913.
Cost ------------------------                                                             $257,720.48.

  The auxiliary damn across Bayou Vermilion, 135 feet from the
junction of Bayous Fusilier and Bourbeau, has decayed and is no
longer effective. There are also four controlling gates, each 31/
feet in the clear, in Spanish Lake Canal between Bayou Teche and
Spanish Lake, about 1 mile from Keystone lock, Louisiana.
   Under ordinary conditions the mean range of tide is about 10
inches at the mouth, 4 inches just below the lock, and zero above the
lock, the extreme range of tide being about 12 inches, 6 inches,
and zero, respectively. The variation of the water surface above
Keystone lock due to freshets is from 2 to 7 feet, while just below
the lock it has been as high as 12 or 15 feet and near the mouth
about 4 or 5 feet.
  RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT            743
   The estimate of cost for new work, revised in 1928, is $850,000,
exclusive of amount expended on previous projects. The latest
 (1936) approved estimate for annual cost of maintenance from
mouth to Arnaudville is $12,000, including $6,000 for operating and
care of the lock and dam.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the im-
provement of the stream from its mouth to St. Martinville by re-
moving obstructions and dredging (Annual Report for 1889, p.
1532) ; act of March 2, 1907, provided for the construction of the
lock and dam and the extension of the improvement to Arnaudville
 (H. Doe. No. 527, 59th Cong., 1st sess.); act of March 2, 1919, pro-
vided for the increased channel dimensions from the mouth to Key-
stone lock (H. Doc. No. 1329, 62d Cong., 3d sess.). Oneration and
care of the lock and dam were included in the project July 1, 1935,
under the provisions of the Permanent Appropriations Repeal Act
approved June 26, 1934. The latest published map is in House Docu-
ment No. 288, Sixty-sixth Congress, first session.
   Local cooperation.-The River and Harbor Act of March 2, 1919,
provided "that no expense shall be incurred by the United States
for acquiring any lands or easements required for the purpose of
this improvement." All prior requirements have been fully complied
with.
   Terminal facilities.-Between the mouth and Breaux Bridge there
are a few small private wharves. Steamboats operating on the bayou
load or discharge their cargo directly on the banks. Through rates
exist from the mouth to Jeanerette, at which point there is a slip
about 400 feet long, the Southern Pacific Railroad tracks paralleling
the slip. Barges are towed to this slip and cargo is transferred by
means of conveyors. The terminal facilities are considered adequate
for the existing commerce. Practically all wharves are privately
owned, but public landing is permitted without charge.
   Operations and results during fiscal year.--Maintenance operations
consisted of the removal of snags and other obstructions from the
bayou above New Iberia, the work being done by hired labor and
Government plant.
   The lock, dam, structures, and grounds at Keystone lock were main-
tained in good condition, and all necessary routine and maintenance
work thereon performed.
   Total costs were $6,064.89, of which $103.15 was for maintenance
and $5,961.74 was for operation of the lock. Toial expenditures were
$5,806.51.
   Condition at end of fiscal year.-The existing project is about 84
percent complete. Keystone lock and dam were completed in 1913
on a reservation of 12.27 acres. The dredging and snagging done in
1916 completed that part of the existing project for the 6-by-50-foot
channel from Arnaudville to Keystone lock. The contract dredging
done in 1918-20 completed that part of the previous p)roject for a
6-by-50-foot channel from Keystone lock to mile 39.7 above the
mouth. The 8-by-80-foot channel from New Iberia to the mouth is
98 percent complete. From the mouth to mile 5.8 a channel 8 by 80
feet or greater already existed, and a new channel has been exca-
vated 8 by 80 feet from this point to mile 50.06, about 3.65 miles
below New Iberia, and 8 by 60 feet from this point to New Iberia.
744       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

The work required to complete the existing project is the widening
of the channel to a bottom width of 80 feet from mile 50.06 to New
Iberia, and to a bottom width of 60 feet from New Iberia to Key-
stone lock. The lock and dam are in good condition. The channel
conditions are good from the mouth to New Iberia, and poor above
that point.
   The controlling depths on June 30, 1937, at mean Gulf level were:
mouth to New Iberia, 8.5 feet; New Iberia to Keystone lock, 6.8 feet.
Controlling depths at mean low water above Keystone lock were:
Keystone lock to Breaux Bridge, 7.5 feet; Breaux Bridge to Arnaud-
ville, 6.2 feet.
   The total costs under the existing project were $1,004,427.67, of
which $708,625.40 was for new work, $284,244.76 for maintenance,
and $11,557.51 for the operation of the lock and dam. The total
expenditures were $1,003,709.71. In addition, the sum of $91,389.25
was expended between July 1, 1913, and June 30, 1935, on the op-
eration and care of the works of improvement under the provision
of the permanent indefinite appropriation for such purposes.
   Proposed operations.-The unexpended balance. at the end of the
fiscal year, $3,047.89, plus an allotment of $8,000 made in July, will
be applied to the maintenance of the bayou and operation and
maintenance of Keystone lock, as follows:
Accounts payable June 30, 1937 ---------------------------------                    $717. 96
Removal of snags and other obstructions by hired labor and Govern-
  ment plant as may become necessary throughout the fiscal year-__                   129. 93
Operation and maintenance of Keystone lock:
    Operation ------------------------------------------- $6, 000
    Ordinary maintenance and repair_ __----______--          2, 400
    Improvements and reconstruction---------------------- 1, 800
                                                                               1---
                                                                                 0, 200. 00

      Total, maintenance ---------------------------------------- 11, 047. 89
  Expenditure of the allotment of $141,400 for new work-dredg-
ing from a point 3.65 miles below New Iberia to Keystone Dam-
will be deferred, as the present channel is adequate for existing
commerce. The development of new oil fields in the immediate
vicinity will probably warrant the accomplishment of this work
(during the fiscal year 1939.
  The additional sum of $8,400 can be profitably expended during
the fiscal year 1939 as follows:
Operation and maintenance of Keystone lock:
   Operation    _.            ..                                  .             .    $6, 00
   Operation-------------------------------                           ---            $ 000
   Ordinary maintenance and repair__                                                  1,700
      Improvements and reconstruction__         --      ---                             700

        Total__                                                                       S, 400
                            Cost and financial summary
Cost of new work to June 30, 1937_ _ __       __$754,                                329. 83
Cost of maintenance to June 30, 1937-__ _________------1387,                         191. 52

      Total cost of permanent work to June 30, 1937---------                1, 141, 521. 35
Minus accounts payable June 30, 1937------                                          717. 96

     Net total expenditures_ __   ------
                                     ___-  -                           11,
                                                 -___________ 140, 803. 39
Unexpended balance June 30, 1937__ _____ - _____-__ ____        3, 047. 89

       Total amount appropriated to June 30, 1937______---             '1, 143, 851.28
  1Includes $91,389.25 from permanent indefinite appropriation.
        RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                                           745

     Fiscal year ending June 30                                 1933              1934                    1935                 1936                1937


Cost of new work__-- ----                  --      ----     -------..
                                                                   -
                                                                  -_.-       .
Cost of t hintenance...---                ...--------     10, 568.40          $48, 561. 90              $24, 417.26        $6, 727.89              $6, 064. 89

Total expended..............-----------------.             50, 135. 60           44,5909.72         -33,477.74                 6, 268. 75          5, 806. 51

Allotted ................----------------------.               78, 186. 62       12, 055. 41            -36, 985.60            8, 119. 67           -293. 84



Balance unexpended July 1. 1936____________________                                                                                         $9, 148. 24
Deductions on account of revocation of allotment                                                                 --       --                     293. 84

      Net amount to be accounted for                 ____                                                                                     8, 854.40
Gross amount expended___________________________     $5, 958. 16
Less:
      Reimbursements collected-             $116. 15
      Receipts from sales -_                  35. 50
                                                                                                                      151. 6i5
                                                                                                                                              5, 806. 51

     "Balance unexpended' June 30. 1937_                                                                                                      3, 047. 89
Outstanding liabilities June 30, 1937--_------------------                                                                                       717.9

     Balance available June 30, 1937__                                                                                                        2, 329. 93
Amount allotted from War Department Civil Appropriation Act
    approved July 19, 1937                                 -           -              -..............
                                                                                       -.....                                               149, 400. 00
     Balance available for fiscal year 1938_                                                                                                151, 729.93
Amount that can be profitably expended in fiscal year elnding
June 30, 1939, for maintenane 2..                                                                                                            8,   400. 00
    2   Exclusive of available funds.

18. THE LOUISIANA AND TEXAS INTRACOASTAL                                                                              WATERWAY FROM
  THE MISSISSIPPI RIVER AT OR NEAR NEW                                                                                ORLEANS, LA., TO
    CORPUS CHRISTI, TEX.                                           (NEW          ORLEANS-SABINE                          RIVER SECTION)

     Location.-This section of the.intracoastal waterwayv extends from
thel Mississippi River at or near New Orleans to the Sabine River,
La. and Tex.
     The section from the Mississippi River to Atchafalaya River, La.,
leaves the Mississippi River about 3 miles above Canal Street and
follows Harvey Canal No. 1, Bayou Barataria, to Bayou Villars, a
land cut south of Lake Salvador to Harvey Canal No. 2, Harvey
Canal No. 2 to Larose, La., on Bayou Lafourche, up Bayou La-
  fourche to Lockport, La., on Company Canal, through Company
Canal and a land cut to Houma, La., thence over a land cut south
of Bayou Black to Bayou Cocodrie, thence through Bayou Cocodrie
and a land cut to Bayou Black, thence through Bayou Black, Bayou
Chene, and Bayou Boeuf to the Atchafalaya River about 0.5 mile
south of Morgan City, La., a total distance of 102 miles.
     Harvey Canal connects with the Mississippi River by Harvey lock
at Harvey, La., opposite New Orleans, about 3 miles above Canal
Street.
     The other route follows the Mississippi River to Plaquemine,
Bayou Plaquemine, and the Grand River system to Morgan City, a
total distance of 176 miles. Bayou Plaquemine connects with the
,Mississippi: River by Plaquemine lock, 112 .miles above New
Orleans, La.
746     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The section from the Atchafalaya River to Vermilion River, La.,
begins at the western end of the Mississippi-Atchafalaya section and
follows the Atchafalaya River 2.5 miles, portions of Little Wax
Bayou, Possum Bayou, cut-offs, a land cut passing through North
Bend Plantation to Bayou Bartholomew, Bayou Bartholomew to
Little Bay, a land cut skirting the north edge of Cote Blanche
Island and the west edge of Weeks Island to Vermilion River,
about 24 miles below Abbeville, La., a total distance of about 63 miles.
   The section from Vermilion River to Mermentau River, La., begins
at the western end of the Atchafalaya-Vermilion section and follows
Vermilion River 1.3 miles, a part of the Schooner Bayou cut-off canal,
and a land cut running in a general northwesterly direction to Mer-
mnentau River at a point about 0.5 mile above its entrance into Grand
Lake and about 16 miles below the town of Lake Arthur, La., a total
distance of about 43 miles. Vermilion lock has been constructed
about 1.75 miles west of Vermilion River to prevent the ingress of
:salt water from Vermilion Bay. Data regarding the lock are given in
the paragraph Existing project.
   The section from Mermentau River to Calcasieu River, La., begins
at the western end of the Vermilion-Mermentau section and follows
the Mermentau River upstream for about 1.5 miles, a land cut run-
ning in a west-southwesterly direction to Lake Misere, passing north
of the lake and Bayou Misere, westerly to Sweet Lake, south and west
of Sweet Lake, northwestly to Bayou Tete Bois, Bayou Tete Bois,
Black Bayou, and cut-offs to a point on Calcasieu River about 16.6
miles below the city of Lake Charles, La., a total distance of about
38 miles.
   The section from the Calcasieu River to Sabine River, La., and
Tex., begins at the western end of the Mermentau-Calcasieu section
and follows the Calcasieu River upstream about 1.6 miles, a land cut
running in a southwesterly direction 2.8 miles, thence west 22 miles
to Sabine River at a point about 3 miles below Orange, Tex., a total
distance of about 26 miles. (See U. S. Coast and Geodetic Survey
Chart No. 1116 and Corps of Engineers Mississippi River Alluvial
Valley Maps, Baton Rouge, Grossetete, Chicot Lake, White Castle.
Foster, Napoleonville, Bayou Sale, Jeanerette, Belle Isle, Morgan
City, and Derouen quadrangles, and U. S. Geological Survey Maps,
New Orleans, Barataria, Cut Off, Houma, Gibson, Abbeville, Schooner
Bayou, Grand Lake East, Latania Lake, Lake Misere, Boudreaux
Lake, Sweet Lake, Lake Charles, Moss Lake, Black Lake, Cameron
Farms, and Phoenix Lake quadrangles.)
   Previous projects.-The projects for the different sections of this
improvement were adopted by the following river and harbor acts:
August 11, 1888; March 2, 1907; June 25, 1910; March 2, 1919; March
3, 1909; February 27, 1911; July 25, 1912; August 8, 1917; July 18,
1918; and September 22, 1922. The total cost of work under these
projects was $4,440,020.11, of which $3,991,058.63 was for new work
and $448,961.48 for maintenance. The total expenditures were $4,483,-
469.03. In addition, $273,266.97 of contributed funds were expended
for new work. (For further details see pp. 878-895 of Annual Report
for 1924.)
   Existing project.-This provides for a waterway from the Missis-
sippi River at or near New Orleans, via two routes to Morgan City,
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                              747
La., thence via one route to the Sabine River, La. and Tex., having
a depth of 9 feet at mean low water and a bottom width of 100 feet
with appropriate side slopes, with such passing places, widening at
bends, lock or guard locks, and railway bridges over artificial cuts as
are necessary,        and for the purchase or construction of a pipe-line
dredge. The length of this section of the waterway is 346 miles via
the northerly or Plaquemine route and 272 miles via the southerly or
Harvey Canal route.
  Under ordinary conditions the mean range of tide is about 10
inches and the extreme about 14 inches. A severe storm may cause
a high tide of from 6 to 9 feet.
  The estimate of cost for new work of the 9- by 100-foot waterway,
revised in 1927, exclusive of amounts expended on previous projects,
was $9,752,000, including $500,000 for a dredge. The latest (1936)
approved estimate for annual cost of maintenance is $304,000, includ-
ing $119,000 for operation and care of locks and dams.
                                           HARVEY    LOCK


Miles from New Orleans, La. (Canal Street)__ 3.
Miles from Mississippi River-     -          0.13.
Width of chamber--                           75 feet.
Length available for full width      _       425 feet.
Lift----------------------------------------0 to 19.6 feet.
Depth on miter sill at low water- _          12 feet.
Character of foundation---                                   Timber piles.
Kind of dam-----                                             None.
Type of construction-----                                    Reinforced concrete.
Opened to navigation. 1934 and completed 1935_
Cost (including approaches)..................
                                  --           $1,775, 132. 24.

                                         PLAQUEMINE LOCK

Miles from New Orleans, La. (Canal Street)_                  112.
Miles from Mississippi River_                                0.10.
Width   of   chamber--------------_---                       55 feet.
Length available for full width-                             260 feet.
Lift_----------------------------------------                0 to 28 feet.
Depth on miter sill at low water------------                 10 feet.
Character of foundation_.                                    Timber piles.
Kind of dam__                                                None.
Type of construction-__                                      Concrete.
Completed and opened to navigation                           1909.
Cost _   __--__                                              $1,302,006.38.

                                         VERMILION    LOCK

Miles from Abbeville, La---------------------    26.
Miles from Vermilion River----------------- 1.75.
Width between abutments-------------------- 56 feet.
Length available for full width---------------1,182 feet.
Lift----------------------------------------- 0 to 5 feet, either direction.
Depth on gate at mean low Gulf level----------12 feet.
Character of foundation----------------------Timber piles.
Kind of dam--------------------------------Reinforced-concrete         spillway
                                                   dam,      vertical cast-steel
                                                   gates, timber-pile founda-
                                                   tions.
Type of construction--------------- ---------- Reinforced concrete.
Opened to navigation 1933 and completed 1934-__.
Cost--------------------------- ------------     $330, 765. 27.
748     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937-

    The existing project was adopted by the River and Harbor Acts
of March 3, 1925, and January 21, 1927 (H. Doc. No. 238, 68th Cong.,
1st sess.). The latest published maps are in this document.
    Operation and care of the locks and dams were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
    Local cooperation.-The River and Harbor Act of March 3, 1925,
provides that no expense shall be incurred by the United States for
acquiring any lands required for the purpose of this improvement,
that local interests shall defray the cost of constructing or remodel-
ing all highway bridges, together with their subsequent maintenance
and operation, and shall furnish, without cost to the United States,
all rights-of-way and necessary spoil-disposal areas; and that work
on the New Orleans-Sabine River section shall not be commenced
   ntil the Secretary of War has received satisfactory assuraiices that
there will be available by the date of its completion adequate vessels,
terminals, and auxiliary equipment for the economical handling of at
least 500,000 tons of commerce annually.
    The above-mentioned assurances were accepted by the Secretary of
War under date of March 12, 1929. Local interests have secured
the necessary rights-of-way and spoil-disposal areas, and the titles
to the deeds have been accepted by the Secretary of War and the
Chief of Engineers as follows: Mississippi River to Bayou Blue,
November 5, 1931; Bayou Blue to Atchafalaya River, June 11, 1931;
Plaquemine to Morgan :City, November 6, 1929; Atchafalaya River
to Vermilion, River, February 14, 1928, and August 1, 1929; Ver-
milion River to Mermentau River, February 14, 1928, and July 15,
1929; Mermentau River to Calcasieu River, April 4, 1929; Cal-
casieu River to Sabine River, January 15, 1913.
    Terminal facilities.-At the Mississippi River end of the Harvey
Canal there is a Government-owned wharf open to all, free of charge.
On Bayou Terrebonne, at Houma, there are several small privately
owned wharves. On the Atchafalaya River, at Morgan City, there
are two large and three small wharves open to all without charge;
there are several private wharves. The terminal facilities are con-
sidered adequate for the existing commerce.
    Operations and results during fiscal year.-New work consisted of
completing the highway from Intracoastal City to Vermilion lock
under contract.
    Maintenance dredging by hired labor and Government plant was
performed as follows: Mississippi-Atchafalaya section, removing
27,411 cubic yards of material from the approaches to Harvey lock;
Plaquemine-Morgan City section, removing 31,101 cubic yards of
material from the approaches to Plaquemine lock; Atchafalaya-Ver-
milion section, removing 313,464 cubic yards of material; Vermilion-
Mermentanu section, removing 67,153 cubic yards of material.
    Improvements and reconstruction were as follows: Construction
by contract of 528 linear feet of timber-fender extensions at Vermil-
ion lock; residing of four residences and the construction of two
4-car garages on the Vermilion lock reservation by hired labor; the
installation of two 5,000-watt generating sets was begun at Vermilion
lock by hired labor; raising the two sump-pump motors at Harvey
  lock 24 feet, entailing the construction of concrete platforms and
  walls to house same, was begun by hired labor.
  RIVERS AND HARBORS.--FIRST NEW ORLEANS, LA., DISTRICT                       749

   Survey work incidental to construction and maintenance of the
waterway was carried on throughout the year.
   The locks, structures, and grounds at Harvey, Plaquemine, and
Vermilion locks were maintained in good condition, and all necessary
and routine maintenance work thereon performed. Plaquemine lock
was closed to navigation between February 13, 1937, and March 11,
1937, because of high water in the Mississippi River.
   The total costs were $250,172.53, of which $7,678.25 was for new
work, $103,162.87 for maintenance, and $139,331.41 for operation and
care of locks. The total expenditures were $261,113.23.
   Condition at end of fiscal year.-The existing project was com-
pleted in,:936. Harvey lock was completed in 1935; the reservation
comprises 3.3 acres. Plaquemine lock was completed in 1909; its
reservation comprises 19 acres. Vermilion lock was completed in
1934; the ground on which it is constructed is possessed by the United
States under an easement deed to a strip of land 300 feet wide along
the Intracoastal Waterway. Dredging of the canal was completed in
1934.
   The controlling depths at mean low Gulf level of June 30, 1937,
were: From the Mississippi River to the Sabine River via Harvey, 9
feet; from Plaquemine to Morgan City, 6 feet.
   The total costs (regular funds) under the existing project to the
end of the fiscal year were $7,679,041.02, of which $6.873,272.98 was
for new work, $568,920.31 for maintenance, and $236,847.73 for opera-
tion and care of the locks. The total expenditures were $7,616,910.57.
   The t6tal costs and expenditures (Public Works funds) under the
existing project to the end of the fiscal year were $353.541.19. The
total costs (all funds Ihave been $8,032,582.21, of which $7,226 814.17
was for new work, $568,920.31 for maintenance, and $236,847.73 for
operation and care of locks. The total expenditures have been $7,-
970.451.76. In addition, the sum of $1,070,432.58 was expended be-
tween July 1, 1909, and June 30, 1935, on the operation and care of
the works of improvement under the provision of the permanent
indefinite appropriation for such purposes.
   Proposed overations.-The unexpended balance at the end of the
fiscal year $25,678.82, plus the allotment of $282,000 made during
July 1937, will be applied to maintenance of the channel and opera-
tion and maintenance of Plaquemine, Harvey, and Vermilion locks,
as follows:
Accounts   payable   June   30,   1937_--   ---------                   $19, 228. 84

                                                         ofollowing
Maintenance dredging by hired labor and Government plant during
the period Sept. -15, 1937, to May 15, 1938, in the
sections :
   Mississippi-Atchafalaya section-------------------$55, 000. 00
   Plaquemine-Morgan City section------------------14, 749. 98
   Atchafalaya-Vermilion section-------------------     11, 000. 00
   Channel Surveys--------------------------------     17, 300. 00
                                                                         98, 049. 98
Operation and maintenance of Plaquemine lock:
   Operation -----------------------------------    31, 250.00
   Ordinary maintenance and repair------------      -9, 400. 00
   Improvements and reconstruction_----------------50, 50. 00
                                                                   -     91, 300. 00
Operation and maintenance of Harvey lock:
   Operation -----------------------------------         33. 000.00
   Ordinary maintenance and repair - - ------..-.. -.    13, 000. 00
    Improvements and reconstruction-____---------          7, 800. 00
                                                                         53, 800. 00
  750               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Operation and maintenance of Vermilion lock:
     Operation                                                                                   $16, 800. 00
     Ordinary maintenance and repair_                                                             3, 000. 00
     Improvements and reconstruction_                                                            10,500. 00
                                                                                                                       $30, 300.00
        Balance available----------------------------------15,                                                              000. 00
  Total for project----       ----------------------------------                                                       307, 678. 82
    The additional sum of $273,600 can be profitably expended during
  the fiscal year 1939 as follows:
  Maintenance dredging by hired labor and Government plant
   as may be found necessary during the fiscal year in the
   following sections:
     Mississippi-Atchafalaya section-----------------------  $44, 000
     Plaquemine-Morgan City section------------------------ 33, 000
     Atchafalaya-Vermilion section--------------------------33, 0C00
     Vermilion-Mermentau section---------------------------   22, 000
     Mermentau-Calcasieu section---------------------------   22, 000
     Channel surveys---------------------------------         11, 000
                                                                                                                         $165, 000
Operation and maintenance of Plaquemine lock:
    Operation __-------------------------------------------- 31, 300
    Ordinary maintenance and repair ----------------------- 8, 000
         Improvements and                   reconstruction_-----                                               2, 000
                                                                                                                            41, 300
Operation and maintenance of Harvey lock:
    Operation --------------------------------------------                                                33, 000
     Ordinary maintenance and repair-----------------------                                               10, 000
    Improvements and reconstruction-------------------                                                     3,100
                                                                                                                           46,000
Operation and maintenance of Vermilion lock:
    Operation -------------------------------------------                                                 17, 300
    Ordinary maintenance and repair------------------------                                                2, 000
    Improvements and reconstruction-----------------------                                                 2, 000)
                                                                                                                           21, 300
            Total for project-------------------------------------------273,600
                        Cost and financial summary
Cost of new work to June 30, 1937 --------------------       12 $11, 217, 872. 80
Cost of maintenance to June 30, 1937------------------------      2, 325, 162. 10
      Total cost of permanent work to June 30, 1937--..----                                                     13, 543, 034. 90
Undistributed costs June 30, 1937--------------------------                                                              377. 24
Net total cost to June 30, 1937   _13                                                                                , 543, 412. 14
Plus accounts receivable June 30, 1937---------------------                                                                 170. 07
      Gross total costs to June 30, 1937--------------------                                                   13, 543, 582. 21
Minus accounts payable June 30, 1937-       --                                                                      19, 228. 84
            Net total           expenditures ....               .-                                    12
                                                                                                      12   1 13, 524. 353. 37
Unexpended balance June 30, 1937--------------------------                                                             25, 78 82
            Total amount appropriated to June 30, 1937                             ----               12   313,       550, 032. 19

     Fiscal year ending June 30                  1933                1934          1935              1936                  1937


Cost (f new work . _            __............$2,181, 324.10 $1, 003, 031.12    $157, 189. 88      $57, 414.19            $7, 678. 25
Cost of maintenance.......-------------           82, 542. 46    167, 896. 87    248, 623. 74      263, 114. 08          242, 494. 28
        Total cost.........--------------   2, 263, 866. 56   1, 170 927. 99    405,   813. 62    320.   52.    27       250, 72. 53
Total expended---..           -----------   2, 313,409.60     1, 319, 844.49     180, 514.45      298, 872. 18           261,113,23
           ........................
Allotted____________------------            1, 567, 773. 76   1, 095, 638. 19    109, 493. 56     197, 975. 77            13, 979. 65


   1Includes $353,541.19 Public Works funds.
     SIn adaition $273,266.97 expended from contributed funds.
    s Includes $1,070,432.58 from permanent indefinite appropriation.
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                 751
ialance unexpended July 1, 1936----                      -     --                              $272, 812. 40
Amount allotted from War Department Appropriation                              Act ap-
  proved Apr. 9, 1935-        --------------                                               -     41, 000. 00

      Amount to be accounted for--                                                              313, 812. 40
Deductions on account of revocation of allotment_-                                               27, 020. 35

      Net amount to be accounted for                 -                                          286, 792. 05
Gross amount expended__------------------                       --         $264, 842. 52
Less reimbursements collected                                $2, 201. 29
Less receipts from sales -------------------                 1, 528. 00
                                                                              3, 729. 29
                                                                                                261, 113. 23

      Balance unexpended June 30, 1937 ---                                             _         25, 678. 82
Outstanding liabilities June 30, 1937----                                                        19, 228. 84
      Balance available June 30, 1937-------------                                                6,449. 98
Accounts receivable June 30, 1937                                              -----                1------------------
                                                                                                    170.  07

     Unobligated balance available June 30, 1937--          _                                     6,620. 05
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937       ___---            ---       ______________
                                                              --------           _              282, 000. 00

      Balance available for fiscal year 1938---------------____                                 288, 620. 05
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance                               -_--                                   273, 600. 00
  4Exclusive   of available funds.

19. THE INLAND WATERWAY FROM FRANKLIN TO THE MERMENTAU
                       RIVER, LA.

  Location.-T-his caial
                     lextends from Hanson lock on Bayou Teche
through Hanson Canal and Bayou Portage to the lltracoastali water-
way, along the intracoastal waterway to its intersection witll the
Schooner Bayou cut-off, along this cut-off to Schooner Bayou. thence
through Schooner Bayou and a land cut to White Lake, through
White, Turtle, Alligator, Collicon Lakes and connecting canals to
Grand Lake, and through Grand Lake to the Mermentau River at
its northern entrance into the lake. The total length of the water-
way is 53.6 miles. (See U. S. Coast and Geodetic Survey Chart No.
1116 and Corps of Engineers "Mississippi River Alluvial Valley"
maps, Foster, Bayou Sale, Jeanerette, and Derouen quadrangles, and
United States Geological Survey maps, Abbeville., Schooner Bayou,
Grand Lake East, and Latania Lake quadranges.)
   Existing project.-This project provides for a waterway from
Bayou Teche at or near Franklin, La., to the Mermentau River,
having a depth of 5 feet below mean low Gulf and a bottom width
of 40 feet, with appropriate side slopes; also the purchase of the
Hanson Canal and the construction of a lock and dam in Schooner
Bayou. This project, reported in the Annual Report for 1924 under
the headings, Intracoastal Waterway, Franklin to Mermentau, La.,
and Intracoastal Waterway from Vermilion River to Schooner
Bayou, La., has largely been superseded by the project "Louisiana
and Texas Intracoastal Waterway from the Mississippi River at or
near New Orleans, La., to Corpus Christi, Tex." Under ordinary
conditions the mean range of tides is about 10 inches and the extreme
range about 14 inches. A severe storm may cause a high tide of
from 6 to 9 feet.
      20190-37-pt. 1--48
752        REPORT     IOF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimate of cost for new work, revised in 1920, was $722,000.
The latest (1936) revised estimate for annual cost of maintenance is
$32,000, including $12,000 for operation and care of the locks. The
estimate of cost for the Schooner Bayou cut-off, made in 1913, was
$37,500 for new work and $1,800 for annual maintenance.
  Data regarding the locks are as follows:
                                    HANSON    LOCK


Miles from Franklin, La----------------1.5.
Miles from Bayou Teche---------------0.
Width of chamber                                 26.5 feet.
Length available for full width ---------- 937 feet.
Lift     ------------------------------ 0.5 feet.
Depth on miter sill at low water -----       --- 5 feet.
Character of foundation
Kind of dam__
                             -------             Timber piles.
                                                 None.
Type of construction_                            Concrete buttresses, wooden mitering
                                                    gates, earth-lock chamber.
Completed 1907. Operated by the United
  States since 1923.
Cost                      __-$65,000, ......                including 4.1 miles of canal.

                               SCHOONER BAYOU LOCK

Miles from Abbeville, La---------------  32.
Miles from Vermilion River------------   9.
Width of chamber-------------------- 36 feet.
Length available for full width------_-- 300 feet.
Lift      --------------------------     0.3 feet.
Depth on miter sill at low water__------ 8 feet.
Character of foundation--------------- Timber piles.
Kind of dam ------------------------     Timber.
Type of construction------------------Concrete buttresses, wooden gates
                                            turning on horizontal hinges at
                                            bottom, earth-lock chamber.
Lock completed and opened to navigation
  1913; dam completed 1914.
Cost-__--     -------------------------  $40,018.10 for lock and $8,500 for
                                            dam..
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, authorized the general project
 (H. Doc. No. 640, 59th Cong., 2d sess.); acts of March 3, 1909, and
February 27, 1911, authorized the Secretary of War to make such
changes in location of the channel as might be desirable; act of
July 25, 1912, authorized the purchase of the so-called Hanson Canal
between Bayou Teche and Cote Blanche Bays, at a cost not to exceed
$65,000; act of March 2, 1919 (H. Doc. No. 1336, 62d Cong., 3d
sess.), authorized the construction of the- Schooner Bayou Cut-Off.
Operating and care of the locks was included in the project July
1, 1935, under the provisions of the Permanent Appropriations Re-
peal Act approved June 26, 1934. The latest published maps are in
the above-mentioned documents and opposite page 2250 of the
Annual Report for 1914.
   Local cooperation.-Fully complied with.
   Terminal facilities.-This improvement comprises a system of arti-
ficial canals and natural waterways passing through an isolated
marsh section of the State, and there are no existing facilities for
handling freight along the route.
  RIVERS AND HARBORS-FIRST              NEW ORLEANS, IA., DISTRICT               753
    Operationls and results during fiscal yearu.--Work of improvement
and reconstruction was confined to Schooner Bayou lock and dam.
It consisted of building three cofferdams, unwatering the lock and
spillway, repairing the sheet-pile cut-off wall under the spillway
dam, and renewing all reinforcing irons on the spillway structure
and the lock gates, by hired labor and Government plant.
    The lock, structures, and grounds at Hanson and Schooner Bayou
locks were maintained in good condition and all necessary and
routine maintenance work thereon performed. Schooner Bayou
lock was closed for repairs between September 11, 1936, and NoveIn-
ber 21, 1936.
    The total costs under the existing project during the fiscal year
were $37,155.67, of which $284.22 was for maintenance and $36,871.45
was for operation and care of the locks. The total expenditures
were $37,394.44.
    Condition at end of fiscal year.-The existing project is completed.
The Hanson Canal and lock were acquired on October 16, 1923;
the lockmaster's house was completed in 1924; the United States
property on which the lock is situated is a strip of land 300 feet
wide between parallel lines running from Bayou Teche to Bayou
Portage, and containing 148 acres. Dredging from Vermilion Bay
to the Mermentau River was completed in 1912. The lock and dam
at Schooner Bayou lock were completed in 1913 and 1914, respec-
tively, and the lockmaster's house in 1917. The United States reser-
vation at Schooner Bayou lock comprises 2 acres. The controlling
depths on June 30, 1937, at mean low Gulf level were: In Hanson
lock, 4.0 feet; Vermilion River to Mermentau River, 2.2 feet.
    The total costs to the end of the fiscal year under the existing
project were $404,306.03, of which $249,051.81 was for new work,
$100,798.19 for maintenance, and $54,456.03 for operation and care
of the locks. The total expenditures have been $403,475.60, exclusive
of the sum of $165,298.55 expended between March 1, 1913, and June
30, 1935, on the operation and care of the works of improvement
under the provision of the permanent indefinite appropriation for
such purposes.
    Proposed operations.-The unexpended balance at the end of, the
fiscal year, $4,426.82,- plus the allotment of $27,000, made dur-
ing July 1937, will be applied to maintenance of the waterway
and to operation and maintenance of Schooner Bayou and Hanson
locks, as follows:
Accounts     payable   June 30, 1937_   __     --           _ _-              $830. 82
Maintenance dredging by one United States pipe-line dredge be-
  tween White and Grand Lakes during the month of May 1938              -   12, 4961 00
Operation and maintenance of Schooner Bayou     h'wk:
    Operation-----           -   ----                   -____   $7, 500
    Ordinary maintenance and repair--------------------            1, 000
    Improvements and reconstruction -----------                    1, 70)
                                                                            10, 200. 00
Operation and nmaintenance of Hanson lock:
    Operation -------------------------------------------          4, 6(0
    Ordinary maintenance and repair_---------------------_         1. C00
    Improvements and reconstruction __               --            2, 300
                                                                             7, 900. 00

       Total for plroject_                                                  31. 421. 82
754                                 INGINi:ERS, U. S. ARMY, 1937
                 REPORT OF CHIEF O) E

  The additional sum of $34,500 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance dredging by one United States pipe-line dredge during the
  months of February and March 1939_-------------------
                                     ___                              $22, 000
Operation and maintenance of Schooner Bayou lock:
   Operation------------------------------- ------------- $7, 500
        Ordinary maintenance and repair__-                                                     --                        400
        Improvements and reconstruction                                  --------------                                  60)
                                                                                                                                        8, 500
Operation and maintenance of Hanson lock:
        Operation          ---------------------------------                                             ----        4, 600
        Ordinary maintenance and repair.       --------                                                                 400
        Improvements and reconstruction--------------------                                                          1, 000
                                                                                                                                        6, 000

           Total for project---------------------------------                                                                         36, 500
                                            Cost and financial summary
('ost of new work to June 30, 1937-----------------------------                                                          $249, 051. S1
Cost of maintenance to June 30, 1937---------------------                                                                 320, 552. 77
      Total cost of permanent work to June 30, 1937 -------------                                                            569, 604. 58
Plus accounts receivable June 30, 1937-------------------                                                                             .39
      Gross total costs to June 30, 1937--------------------------569,                                                               604. 97
Minus accounts payable June 30, 1937---------------------------                                                                      830. 82
     Net total expenditures 1- - - - - - - - - - - - - - - - - - - - - - - - - - _                               -- -
                                                                                                                             568, 774. 15
Unexpended balance June 30, 1937---------------------------                                                                    4, 426. 82
           Total amount appropriated to June 30, 19371                                                                       573, 200. 97

           Fiscal year ending June 30                        1933             1934              1935              1936                1937


Cost of new work----....                        .-----------------------
Cost of maintenance .....------.....-------------............. $8, 660. 45 $9, 924. 12    $23, 258. 84      $45, 322. 16            $37, 155. 67
Total expended-----.....      -----------------            8, 738. 30        9, 811. 55    23, 877. 53          44, 155. 51          37, 394. 44

Allotted-------.----------------------8, 294. 47                             9, 373. 70    71, 139.00           33, 079.31            3, 059.01


Balance unexpended July 1, 1936--------------------------------38, 762. 25
Amount allotted from War Department Appropriation Act approved
April 9, 1935---------- --------------------------------------- 20, 500. 00

     Amount to be accounted for                                                                                                   262. 25
                                                                                                                              5------------------------------
Deductions on account of revocation of allotment ....                                                                         17, 440. 99
      Net amount to be accounted for---------------------------___                                                            41, 821. 26
Gross amount expended-----------------                                                              $39, 303.99
Less reimbursements collected----                                                    _                 1, 909. 55
                                                                                                                              37, 394. 44
      Balance unexpended June 30. 1937--                                                                                       4, 426. 82
Outstanding liabilities June 30, 1937  -                                                                                          946. 22
          Balance available June 30, 1937_ -----------------------                                                             3, 480. 60
Accounts receivable June 30, 1937__                                     --                --                                                 . 39
     Unobligated balance available June 30, 1937-----------------                                                              3, 480. 99
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937 --      ______-_______        ______        _                                                           27, 000. 00
Balance available for fiscal year 1938 -___--                                                   ____                          30, 480. 99
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance                              _        _                                                            36,    500).    00
1 Includes $165,298.55 from permanent indefinite appropriation.
   SExclusive of available funds.
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT              755

          20. PETIT ANSE, TIGRE AND CARLIN BAYOUS, LA.

   Location.-Bayou Tigre is a tributary of Bayou Carlin; Bayou
Carlin is a tributary of Bayou Petit Anse. Bayou Petit Anse has
its source in Iberia Parish about 5 miles northwest of New Iberia.
It flows in a southwesterly direction for about 15 miles to its inter-
section with the Intracoastal Waterway, thence for a distance of
about 3 miles to Vermilion Bay. Bayou Tigre has its source in Ver-
milion Parish about 6 miles northeast of Abbeville, and flows in a
southerly direction for about 7 miles to its junction with Bayou
Carlin. Bayou Carlin has its source in Lake Peigneur in Iberia
Parish and flows in a southerly direction about 7.5 miles to its con-
fluence with Bayou Petit Anse at a point about 2.3 miles above the
Intracoastal Waterway. (See U. S. Coast and Geodetic Survey
Chart No. 1277 and Corps of Engineers Mississippi River Alluvial
Valley map, Derouen quadrangle).
   Existing project.-This provides for dredging a channel in Bayou
Petit Anse 9 feet deep and 80 feet wide from the Intracoastal Water-
way to the north end of Avery Island; a channel 5 feet deep and
40 feet wide from the Intracoastal Waterway via the McIlhenny
Canal to deep water in Vermilion Bay; and a channel 5 feet deep over
a bottom width of 40 feet in Bayou Carlin from Bayou Petit Anse
to Lake Peigneur. The total length of the improvements is 16.1
miles. Under ordinary conditions the mean range of tide is about 10
inches.
   The estimated cost of new work, revised in 1937, is $58,500. The
latest (1937) approved estimate for annual cost of maintenance is
$2,400.
   The existing project was adopted by the River and Harbor Acts
approved August 30, 1935 (H. Doc. No. 225, 72d Cong., 1st sess.),
and August 26, 1937 (River and Harbor Committee Doc. No. 40,
75th Cong., 1st sess.), the latter act providing for the present project
dimensions in Bayou Petit Anse and for the channel to Vermilion
Bay. Prior to the first authorization, the improvement had been in-
cluded in the Public Works program under the National Industrial
Recovery Act on September 6, 1933. The latest published map is
contained in the latter document.
   Local cooperation..-The work included in the Public Works pro-
gram and adopted by the River and Harbor Act of August 30, 1935,
is subject to the condition that local interests furnish all rights-of-
way and suitable areas for disposal of dredged material, and shall
construct a suitable public terminal at the head of Avery Island and
reconstruct all highway and railroad bridges to provide suitable
clearance, all without cost to the United States. These requirements,
excepting the construction of a public terminal, have been complied
with. Under the provisions of the River and Harbor Act of August
26, 1937, local interests are required to furnish free of cost to the
United States, rights-of-way of not less than 200 feet along the
McIlhenny Canal, and suitable spoil disposal areas for new work and
subsequent maintenance as required.
   Under a permit issued March 24, 1937, the Texas Pipe Line Conm-
pany is now enlarging the 5 by 40-foot channel in Bayou Petit Anse
above mile 3.2 to a depth of 9 feet and a width of 80 feet, at an
estimated cost of $30,000.
756          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.--There is an extensive oil terminal at the head
of the improvement on Bayou Petit Anse, and several private docks
and cane hoists. Terminal facilities are further described in H. Doc.
No. 225, 72d Cong., 1st sess). These facilities are considered ade=
quate. for existing commerce.
   Operations and results during fiscal year.-There were no opera-
tions during the fiscal year. Costs and expenditures (Public Works
funds) were $100, all for new work, in payment of outstanding lia-
bilities for work performed during the fiscal year 1936.
   Condition at end of fiscal year.-The existing project is 84 per-
cent completed. The work remaining to be done consists in widen-
ing Bayou Petit Anse from a width of 60 feet to a width of 80 feet
from the Intracoastal Waterway to the north end of Avery Island
 (mile 3.2), and the enlarging of the McIlhenny Canal to dimensions
of 5 by 40 feet from the Intracoastal Waterway to deep water in
Vermilion Bay. The controlling depths at mean low Gulf level on
June 30, 1937, were from the Vermilion Bay to the Intracoastal
Waterway, 4.0 feet; from                      .the
                                Intracoastal Waterway to mile 3.2 in
Bayou Petit Anse, 9 feet; from mile 3.2 to mile 6.1, the head of
Avery Island, 6.0 feet; in Bayou Carlin from Bayou Petit Anse to
Lake Peigneur 5.8 feet.
   The total costs and expenditures were $47,858.13, all for new work.
   Proposed operations.-The anticipated allotment of $15,000 will
be applied to maintenance dredging by the U. S. pipeline dredge
Delatour during the period October 15 to November 30, 1937.
   The additional sum of $8,300 can be profitably expended for new
work by hired labor and Government plant during the fiscal year
1939 to be applied to widening Bayou Petit Anse to a width of 80
feet from the Intracoastal Waterway to mile 3.2 and dredging a
5 by 40-foot channel from the Intracoastal Waterway via the
McIlhenny Canal to Vermilion Bay.
                                           Cost and   .,inancial         ,summary


Cost of new work to June 30, 1937-------                              ------------------------ $47, 858.13
Cost of maintenance to June 30, 1937                              -
        Total cost of permanent work to June 30, 1937----                                                  --               47, 858. 13

Net total expenditures                                                                                                          858. 13
                                                                                                                            4------------------------------
Unexpended balance June 30, 1937 __2    ---
                                   -____-                                                  ____,                                300. 00
         Total amount appropriated to June 30, 1937______ ______-                                                           50, 158. 13


        Fiscal year ending June 30                     1933                  1934              1935             1936             1937


Cost of new work-------------------------               --                   $135.96        $16, 377. 68    $31, 244. 49             $100
Cost of maintenance                                      -    -                                -                            i- -------
Total expended           ---------------      -                                  135.96      14,270.01       33.352.16                  100

Allotted______________          ______________                        I38,       500. 00     11, 694. 53        -36.   40    ...


Balance unexpended July 1, 1936                                              _                                              $2, 400.00
Gross amount expended                                                                                                                 00
                                                                                                                                1----------------00.
         Balance unexpended June 30, 1937-----------_                                                                        2, 300. 00
  RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                       757

Amount (estimated) required to be appropriated for completion of
existing project ----------------------------        -----------      $8, 300. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work       ----                 ----------------    8, 300. 00
  1 Exclusive of available funds.

     21. WATERWAY FROM WHITE LAKE TO PECAN ISLAND, LA.

   Location.--The waterway from White Lake to Pecan Island is an
artificial canal extending from the south shore of White Lake almost
due south for a distance of approximately 1.55 miles to Pecan
Island. (See U. S. Coast and Geodetic Survey Chart No. 1278 and
U. S. Geological Survey map Pecan Island quadrangle.)
   Existing project.-This provides for a channel 40 feet wide and
5 feet deep from that depth in White Lake to Pecan Island via the
existing canal, with suitable protective works at the entrance. The
water elevation in White Lake varies between plus 3.5 and minus 1.5
with an average of plus 0.9.

       "(1937)
   The estimate of cost for new work made in 1937 is $19,000. The
latest
$700.
                .approved estimate for annual cost of maintenance is
   The existing project was adopted by the River and Harbor Act
approved August 26, 1937 (H. Doc. No. 78, 75th Cong. 1st sess.).
The latest published map is in the project document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests furnish, free of cost to the United States,
rights-of-way for a width of 75 feet on each side of the canal center
line and suitable spoil-disposal areas for new work and subsequent
maintenance. Work of securing these rights-of-way and spoil-
disposal areas has been begun and will be completed December 1,
1937.
   Ternminal facilities.-There is a small cattle-loading pen and a
ramp near the head of the canal, which are considered adequate for
prospective commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing project. On June 30, 1937, controlling depths of mean low
Gulf level were 2.5 feet over the bar at the mouth of the canal and
4 feet through the canal to Pecan Island.
   Proposed operations.-No funds are available and no operations
proposed during the fiscal year 1938.
   The sum of $19,000 can be profitably expended for new work
during the fiscal year 1939, to be applied to dredging a 5- by 40-foot
channel under contract, from White Lake to Pecan Island, and the
construction of suitable protective works.
                              Cost and financial su1ant nury

Total amount appropriated to June 30, 1937----------------
Amount (estimated) required to be appropriated for completion
of existing project--------------------------------------------- $19, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1989, for new work---------------------------------------19, 000.00
758      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

      22. MERMENTAU RIVER, BAYOU NEZPIQUE, AND BAYOU DES
                            CANNES,   LA.

   Location.-Mermentau River is formed by the junction of Bayous
des Cannes and Nezpique, 2.25 miles above Mermentau, La., and
flowing,-in a southwesterly direction empties into the Gulf of Mexico.
   Bayou Nezpique rises in Evangeline Parish, flows in a southerly
direction, and empties into the Mermentau River.
   Bayou des Cannes rises in Evangeline Parish, flows in a south-
southwesterly direction, and empties into the Mermentanu River.
 (See U. S. Coast and Geodetic Survey Chart No. 1116 and U. S.
Geological Survey maps Mermentau, Jennings, Lake Arthur, Guey-
dan, Thornwell, Latania Lake, Grand Lake East, Catfish Lake,
Grand Chenier, and Bayou Labauve quadrangles.)
   Ex.isting project.-The project provides for the removal of obstruc-
tions to navigation to secure the natural channel throughout the
entire Mermentau River, a distance of 71.5 miles, and through Bayou
Nezpique from its mouth to 25 miles above, and Bayou des Cannes
from its mouth to Evangeline Bridge (mile 8.5) ; for improving the
channel in Lower Mud Lake by constructing a brush dam to con-
centrate the action of the current and by dredging; and for remov-
ing a portion of the wrecked dam 7 miles above the mouthli; and for
dredging a channel 9 feet deep over a bottom width of 100 feet from
the Intracoastal Waterway to the junction of Bayous Nezpique and
des Cannes.
   Under ordinary conditions the mean range of tide on the Mer-
mentau River near the mouth is 10 inches and near the head about 3
inches, the extreme range being 14 inches and about 5 inches, respec-
tively. The variation of the water surface near the mouth may be as
much as 7 or 8 feet, due to hurricanes on the Gulf, and near the head
from 8 to 12 feet due to freshets. On Bayou Nezpique, under ordi-
nary conditions, the range of tide is about 3 inches at the mouth and
nothing at the head. On Bayou des Cannes, under ordinary condi-
tions, the range of tide is about 3 inches at the mouth and nothing
at the head.
   The estimate of cost for new work, revised in 1935. was $53,615;
and that for the removal of the dam, made in 1916, $1,500. The latest
 (1935) approved estimate of cost for annual maintenance is $2,200.
   The existing project was authorized by the following river and
harbor acts: The act of July 13, 1892, provided for the general proj-
ect (Annual Report for 1891, p. 1862) ; act of July 27, 1916, provided
for the removal of a portion of the wrecked dam near the mouth
 (H. Doc. No. 1232, 64th Cong., 1st sess.) ; and the act of March 2,
1919, provided for the improvement of Bayou des Cannes (H. Doc.
No. 1398, 65th Cong., 3d sess.). The dredging of the channel to a
depth of 9 feet over a bottom width of 100 feet was adopted by the
River and Harbor Act, approved August 30, 1935, and was authorized
by the Public Works Administration March 28, 1934 (Rivers and
Hllarbors Committee, Doc. No. 36, 72d Cong., 1st sess.). The latest
published maps is printed in the last-mentioned document.
   Local cooperation.-The work is subject to the condition that local
interests shall furnish, free to the United States, all rights-of-way
and suitable areas for the disposal of dredged material during initial
construction and for future maintenance as and when needed.
      RIVERS AND HARBORS-FIRST NEW ORLEANS, LA.; DISTRICT                                                                759
   Terminal facilities.-There are several private wharves and ware-
houses at Grand Chenier. These are small, ordinary wharves. There
is a well-constructed public wharf at Lake Arthur, La., open without
charge. At Mermentau, La., the Southern Pacific Railroad owns a
long wharf, with a spur running to the wharf. There is another small
landing and warehouse at this place open without charge. There is a
large rice-storage warehouse on Bayou Nezpique. On Bayous des
Cannes and Nezpique there are a few private landing places and
small wharves along the route, which are sufficient to meet the present
demand of commerce and are open without charge. The facilities
are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project, except for
the 9-by-100-foot channel, was completed in 1917; the 9-by-100-foot
channel was completed in 1935. Channel conditions are good in the
Mermentan River and in Bayou Nezpique and poor in Bayou des
Cannes.
   The total costs and expenditures (regular funds) under the exist-
ing' project were $80,568.37, of which $27,580.35 was for new work
and $52,988.02 for maintenance.
   The total costs and expenditures (Public Works funds) under the
existing piroject were $29,974.42, all for new work. The total costs
and expenditures, all funds, have been $110,542.79. of which $57,-
554.77 was for new work and $52,988.02 was for maintenance.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $15,000 can be profitably expended during the fiscal
year 1939 removing snags in Bayou des Cannes by the United States
bucket dredge Grossetete during the period from July 1 to Septem-
ber 15, 1938.
                                       Cost and financical sunnmary

Cost of new work to June 30, 1937---------------------------                                                     $57, 554. 77
Cost of maintenance to June 30, 1937 -------------------                                                            52, 988.02

      Total cost of permanent work to June 30, 1937------------- 110, 542. 79
Net total expenditures------------------        -----          -  110, 542. 79
Total amount appropriated to June 30, 1937 ------------------    1110, 542. 79


         Fiscal year ending June 20                     1933             1934          1935               1936         1937


Cost of new work                                       ---------       $2, 670.30   $27, 304. 12   ---
Cost of maintenance---       ------------------   ------------      ------------     14,907. 35            $33.06

                                                                    2, 670. 30                              33. 6 '6
       Total cost_       .     . . --.-    -----.. .--.------- -....                 42,211.47

Total expended-                                    -                   1, 153. 63    40, 840. 83         2,920.37

Allotted .._                                       -    --     -.     45,000.00         -25.58            -59.59-..



Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------ ------------------------ ------ $15, 000.00
  1   In(ludes $29,974.42 from Public Works funds.
760      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                  23. BAYOU PLAQUEMINE BRULE, LA.

    Location.-This stream rises in the southwestern part of St.
Landry Parish and flows about 75 miles in a southwesterly direction,
                                                  33/
discharging into Bayou des Cannes about 4 miles above Mermen-
tan, La.. The .section under ,,iliprovement is fromn the mouth +for-a
distance of about 19 miles to near Crowley, La. (See U. S. Coast
and Geodetic Survey Chart No. 1116 and U. S. Geological Survey
maps Estherwood and Mermentau quadrangles.)
    Existing project.--This provides for a channel 6 feet deep at mean
low Gulf and bottom width of 60 feet from the mouth to a point
near Crowley, La., a distance of 19 miles, by dredging and removing
obstructions. Under ordinary conditions the mean range of tide is
about 2 inches at the mouth and nothing at the head, the extreme
range being about 4 inches and nothing, respectively. Due to floods
the variations of water surface are at times about 10 feet. The
estimate of cost of new work, revised in 1913, was $3;00: The litest
  (1928):approved estimate for annual cost of maintenance is $1,000.
    The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 789, 60th Cong., 1st sess.). There is no
published map.
     Terminal facilities.-The town of Crowley has constructed a
  feeder canal from the end of the improvement to Crowley, and a
  warehouse at Crowley, both of which are open to all carriers with-
out charge. Along the bayou landings are made on the banks. The
  facilities are considered adequate for the existing commerce. (For
  further details see H. Doc. No. 652, 66th Cong., 2d sess.)
     Operations and results during fiscal year.-None.
     Condition at end of fiscal year.-The existing project was com-
  pleted in 1915. The channel is in good condition. The controlling
  depth on June 30, 1937, was 6 feet, mean low Gulf, available
  throughout the year.
     The total costs and expenditures under the existing project to the
  end of the fiscal year were $61,624.60, of which $32,759.90 was for
  new work and $28,864.70 for maintenance.
     Proposed operations.-There are no funds available and no opera-
  tions proposed during the fiscal year 1938.
     The sum of $15,000 can be profitably expended during the fiscal
  year1'989 .in removing snags by the United States bucket dredge
  Grossetete during the period from September 16 to December 1, 1938.
                          Cost and financial summary

Cost of new work to June 30, 1937                                            759. 90
                                                                        $-------------------------
                                                                        $32,
Cost of maintenance to June 30, 1937----------------------              28, 864. 70

       Total cost of permanent work to June 30, 1937____---      ____    61, 624. 60
Net total expenditures--------------------         ------------         61, 624. 60
Total amount appropriated to June 30, 1937_                             61, 624. 60
Amount that can he prfitably expended in fiscal year ending June
  30, 1939, for maintenance-----------       --------------              15,     0.00

                   24. CALCASIEU RIVER AND PASS, LA.

   Location. Calcasieu River has its source in Southwestern Loui-
siana, and flows in a generally southerly direction to the Gulf of
   RIVERS AND HARBORS-FIRST         NEW ORLEANS, LA., DISTRICT     761

Mexico. About 25 miles from the Gulf it debauches into Calcasieu
Lake, which lake is about 18 miles long. The connection between
the lake and the Gulf, about 7 miles long, is known as Calcasieu
Pass. (See U. S. Coast and Geodetic Survey Chart No. 1116 and
U. S Geological.Survey maps, Lake Charles,,West Lake, Moss Lake,
Hackberry, Sweet Lake, Brown Lake, Holly Beach, Grand Bayou,
and Cameron quadrangles.)
    Previous projects.-The original project for this improvement was
adopted by the River and Harbor Act of June 10, 1872. Appropria-
tions were made by the River and Harbor Acts of March 3, 1881,
August 2, 1882, July 5, 1884, and August 11. 1888. The project was
modified by the River and Harbor Acts of September 19, 1890, July
13, 1892, and September 22, 1922. The costs and expenditures prior
to the adoption of the existing project were $690,764.51, of which
$495,913.63 was for new work and $194,850.88 for maintenance. (For
further details, see Annual Report for 1936, p. 719.)
    Existing project.-This provides for a chanlel 30 feet deep and
250 feet wide from the wharves of the Lake Charles Harbor and
Terminal District by way of Calcasieu River to the head of Chou-
pique cut-off; thence by a land-and-water cut along the west shore of
Calcasieu Lake; thence to and through Calcasieu Pass by a designated
route to the Gulf of Mexico, subject to such change in alinement
as is approved by the Chief of Engineers; the reconstruction and
extension of the existing jetties initially to the seaward end of the
east jetty; dredging a channel 30 feet deep and 250 feet wide be-
tween the jetties, and an approach channel 32 feet deep and 400 feet
wide from the sea end of the jetties to a depth of 32 feet in the Gulf
of Mexico; also, for the improvement of the river from Lake Charles
to Phillips Bluff by removing logs, snags, overhanging trees, and by
dredging. The project also provides for extension of the jetties to
'the 15-foot depth contour if found advisable to reduce maintenance
dredging costs. Total length of improvement is 95.5 miles. Under
ordinary conditions, the mean range of tide is 10 inches at the mouth,
diminishing to zero at Phillips Bluff, the extreme range being 14
inches and zero, respectively.
    The estimate of cost for new work, including $3,400,000 for the
extension of the jetties to the 15-foot contour, revised in 1937, is
$9,260,000. The latest (1937) approved estimate for cost of main-
tenance is $250,000 annually for the first 3 years, and $190,000
annually thereafter.
    The existing project was authorized by the River and Harbor Act
of August 26, 1937, which provided for the 30- by 250-foot channel
from the Lake Charles docks to the Gulf of Mexico (H. Doc. No. 299,
75th Cong., 1st sess.). A modification of the original project of 1872,
dated May 12, 1881, provided for the general improvement of the
river from Phillips Bluff to its mouth (H. Ex. Doc. No. 46, 46th
Cong., 3d sess.). The latest published maps are in the first-men-
tioned document.
    Local cooperation.-The River and Harbor Act of August 20,
1937, provides that local interests furnish, free of cost to the United
States, necessary rights-of-way not less than 500 feet in width, and
suitable spoil-disposal areas for new work and for subsequent main-
tenance as required, and hold and save the United States free from
762            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

damages, including those to the rice industry due to the construction
works. Local interests have begun work on obtaining the required
rights-of-way and spoil-disposal areas; this will be completed prior
to June' 30, 1938.
   Under date of January 5, 1922, a permit was granted by the Assist-
ant- Secretary of War to the police-jury of Calcasieu Parish to enlarge
this river where necessary between Lake Charles and the eastern end
of the Calcasieu-Sabine Section of the Intracoastal Waterway to a
depth of 30 feet over a bottom width of 125 feet.
   Terminal facilities.-Terminal facilities at the Port of Lake
Charles are owned by the Lake Charles Harbor and Terminal District
and operated by a Board of Commissioners. In addition to the munic-
ipally owned terminals, there are several privately owned and oper-
ated wharf structures located on the existing ship channel. The
terminal facilities are reported to be often taxed beyond their ca-
pacity. (For further details, see H. Doc. No. 299, 75th Congress, 1st
session.)
   Operations and results during fiscal year.-None.
   Conwition at end of fiscal year. No work has been performed un-
der the existing project and no expenditures have been made.
   The controlling depths at Mean Low Gulf on June 30, 1937, are as
follows: Over the bar at the mouth of the river, 9 feet; through
Calcasieu Pass, 12 feet; through Calcasieu Lake 51/2 feet; from the
head of Calcasieu Lake to Lake Charles, 30 feet; and from Lake
Charles to Phillips Bluff, 5 feet. The jetties are in fair condition, and
the channel is in good condition as far upstream as Lake Charles, and
poor above Lake Charles.
   Proposed operations.-No funds are available and no operations
proposed during the fiscal year 1938.
   The sum of $1,955,000 can be profitably expended for new work
during the fiscal year 1939 to be applied to dredging a 30- by 250-foot
channel from Lake Charles to a point near the west shore of Calcasieu
Lake about 20 miles below Lake Charles.
                                      Cost and financial summary

Cost of new work to June 30, 1937_                                                                            $495, 913. 63
Cost of maintenance to June 30,. 1937-----------------                                                         194, 850. 88
            Total cost of permanent work to June 30, 1937                                   ------------           690,764.51
Net    total     expendtures--_,          _--__ --                                _                            690, 764. 51
Total amount appropriated to June 30, 1937--------------------                                                     690,764.51

         Fiscal year ending June 30                  1933                  1934            1935        1936            1937

Cost of new work       ...-                             --      -                 -             -
                                                                                       -----------             - -      -
Cost of maintenance----------                -         $1. 68   ----                  --             $6, 725. 33
Total expended-------------------------                18. 39                                 _       6, 725. 33
Allotted_                                        --1,739.90         ----    ___-_      $25, 000   -18,274.67       -
   RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                    763
Amount (estimated) required to be appropriated for completion
of existing project---------------------------------------   $9, 260, 000. 00
Amount that can be profitably expended in fiscal year ending
                                ----------------------------
June 30, 1939, for new work---__                              1, 955, 000. 00

           25. LAKE CHARLES       DEEP WATER CHANNEL, LA.

   Location.-The Lake Charles Deep Water Channel, 24.9 miles in
length, extends from the Calcasieu River to the Sabine River, fol-
lowing the Calcasieu-Sabine section of the Intracoastal Waterway.
The channel has access to deep water through the Sabine River,
Sabine-Neches Canal, Port Arthur Canal, and Sabine Pass to the
Gulf of Mexico. (See U. S. Coast and Geodetic Survey Chart No.
1116 and U. S. Geological Survey maps Moss Lake, Black Lake,
Cameron Farms quadrangles.)
   Existing project.-This provides for the maintenance of a chan-
nel 30 feet deep, with a bottom width of 125 feet, from Calcasieu
River to the Sabine River. Under ordinary conditions, the mean
range of tide is 2 to 3 inches; variations of 1 to 2 feet may be ex-
perienced due to high water on the Sabine or Calcasieu River.
   The estimated cost of the work, made in 1931, is $50,000 for the
first initial maintenance and $30,000 annually thereafter.
   The existing project was authorized by the Public Works Ad-
ministration January 3, 1934, and was adopted by the River and
Harbor Act approved August 30, 1935 (H. Doc. No. 172, 72d Cong.,
1st Sess.). Under provisions of the River and Harbor Act approved
August 26, 1937, modifying the project for Calcasieu River and
Pass, the section of the Calcasieu River between the Intracoastal
Waterway and Lake Charles was dropped from the existing project.
   Local cooperation.-Fully complied with.
   Term ital facilities.-None. (See project for Calcasieu River and
Pass.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The channel is in fair condition;
the controlling depth on June 30, 1937; was 30 feet in the center of
the channel; depths are somewhat less on the edges of the channel,
due to lowering of the side slopes, but the shoaling is not sufficient
to interfere seriously with navigation.
   The total costs and expenditures (Public Works funds) were
$79,577.63, all for maintenance.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1938.
   The sum of $80,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging under contract during the period
September 1, 1938, to January 31, 1939.
                         Cost and financial sunLnutary

Cost of new work to June 30, 1937 __-----------------------      -----
Cost of maintenance to June 30, 1937--------------                 $79, 577. 63
      Total cost of permanent work to June 30, 1937--               79, 577. 63
Net total expenditures----------------      --           --         79, 577. 63
Total amount appropriated to June 30, 1937___                       79, 577. 63
764           REPORT OF CHIEF OF ENGINEERS, U.                                         S. AIMY, 1937



         Fiscal year ending June 30                    1933           1934             1935           1936       1937


Costof ofnew work...-----------           ----                ----------------------             ------------....--...
Cost of maintenance              ---..            I        -- -     $6, 628.09    $72,949. 54------------

Total expended_ __         ---                   __.-------          5, 143. 21   74, 434. 42     .

Allotted---------     -----------------           ------------      80, 000. 00        -422.37   -

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance--- ----------                     ---  $80, 000. 00
                                    26. VINTON WATERWAY, LA.

   Location.-Vinton Waterway is an artificial canal, extending from
the town of Vinton southward 9.7 miles to the Lake Charles Deep
Water Channel, which it intersects at a point about 8 miles east of
the Sabine River (see U. S. Coast and Geodetic Survey Chart No. 1116
and U. S. Geological Survey maps, Vinton and Cameron farms
quadrangles).
   Existing project.-This provides for a waterway 9 feet deep and
60 feet wide from the interesection of the Vinton Waterway with the
Lake Charles Deep Water Channel to a turning basin of the same
depth, 100 feet wide and 200 feet long at Vinton. Normal tidal
variation is about 1 foot.
   The estimate of cost of new work made in 1937 is $14,000. The
latest (1937) approved estimate for annual cost of maintenance is
$1,500.
   The existing project was adopted by the River and Harbor Act
approved August 26, 1937 (House )oc. No. 160, 75th Cong., 1st sess.).
The latest published map is in the project document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests furnish, free of cost to the Udnited States,
a right-of-way, not less than 200 feet wide, extending not less than
100 feet on each side of the center line of the waterway, suitable spoil-
disposal areas for new work and for subsequent maintenance as re-
quired, and agree to construct adequate public terminal facilities at
Vinton. The work necessary to comply with these provisions will be
begun immediately and completed about March 1, 1938.
   Terminal facilities.-There is a small private oil-loading wharf
near Ged, at mile 6. A public terminal at Vinton is required as a
measure of local cooperation. These facilities will be adequate for
prospective commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing project. On June 30, 1937, central depths throughout the
canal varied from 14 to 4.6 feet, the average being about 10 feet.
Surface widths varied from 85 to 135 feet, averaging about 100 feet.
   Proposed operations.-No funds are available and no operations
proposed during the fiscal year 1938.
   The sum of $14,000 can be profitably expended for new work during
the fiscal year 1939, to be applied to dredging, under contract, a 9- by
(iO-foot channel from Vinton to the Lake Charles Deep Water Channel.
  RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                      765

                          Cost and financial summary
Total amount appropriated to June 30. 1937---------------------------
Amount (estimated)   required to be appropriated for completion of
  existing project----------------    -                              $14, OO.00
Amount that can be profitably expended in liscal year ending June
  30, 1939, for new work---------------------------------             14, 000.00
         27. REMOVING THE WATER HYACINTH (LOUISIANA)

  Loeation.-Lakes awld streams tributary to the Gulf coast.
  Existing   projec.--Thisproject provides for the externminatiou or
removal of plants from the navigable waters of the States of lFlorida,
Alabama, Missississippi, Louisiana, and Texas, so far as they are or
may become an obstruction to navigation, by any mechanical, chemi-
cal, or other means whatsoever: for the construction and operation
of boats equipped with suitable machinery for such removal; and
for the construction and operation of booms to prevent the drifting
of plants from one stream to another. The latest (1935) lapproved
estimate for annual cost of maintenance is $60,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, made appropriations for the
States of Florida and Louisiana and provided for the extermination
or removal of plants, the building of boats, and the establishment of
booms (H. Doc. No. 91, 55th Cong., 3d sess.) ; act of June 13. 1902,
authorized the use of any mechanical, chemical, or other means what-
soever act of March 3. 1905, made the appropriation available for
the State of Texas; acts of March 3, 1905, and March 2, 1907. in
making appropriations for Florida, provided that no chemical proc-
ess injurious to cattle which may feed upon the water hyacinth
shall be used; act of July 25, 1912, made the appropriation available
for the State of Mississippi and also made available for use in that
State the operating plant pertaining to the work in Louisiana; and
the act of July 27, 1916, made the appropriation available for the
State of Alabama.
   Terminal facilities.--The terminal facilities of the various streams
from which hyacinths were removed are described in the reports for
the improvement of these streams.
   Operation and resalts during fiscal /ear.-The U. S. spray boat
Ch.ene sprayed a total of 15,860,340 square yards of water hyacinths
in Bayous Alligator, Bedico, Black, Bonfouca. Chene Blanc, Des
Allemands, Dutch. Gauche, Goddel, Grossetete, Lacassine, Long, La-
fourche, Mississippi, Petit Amite, Perot, and Segnette, and in the
Blind, Blood, Mermentau. Natalbany, and Tickfaw Rivers, and in
the Intracoastal Waterway. Floating plant was also engaged in mis-
cellaneous work, such as pile driving, removing obstructions, and
hyacinth-boom installation and maintenance. A total of 6,023,000
square yards of alligator grass was removed by hand from Bayous
Black. Grand Caillou, Grossetete, Lafourche, Lecarpe, and Terre-
bonne and the Intracoastal Waterway.
    The mechanical hyacinth-destruction plant Kenny was completed
by the contractor, and at the close of the fiscal year was undergoing
final tests prior to acceptance. Experimental work was carried on
with a view to improving present spraying methods and developing
mechanical menans of removal.
                                                                          :
766       REPORT OF       CHIEF     OF ENGINEERS, U. S. ARMY, 1937

   The total costs were $63,722.46, all for maintenance. The total
expenditures were $63,499.01.
   Condition at end of fiscal year.-From 1900 to 1902 a boat with
suitable machinery for removing and crushing the hyacinth was
operated. From that time until 1915, the U. S. steamer Hyacinth,
equipped with means of spraying plants with a solution of arsenic
and soda, has been used in those streams of such commercial im-
portance as to justify improvement. Booms have been constructed
at certain points to prevent the drifting of the plant from nonnav-
igable streams into those which are navigable. The work done has
resulted in a great benefit to navigation. In 1915, the U. S. barge
Chene was equipped for spraying smaller streams, but was placed
out of commission in September 1922. In 1930 the machinery was
changed to increase its efficiency. In 1932 a new steel spray boat was
purchased and the machinery from the old barge Chene transferred
to the new spray boat. This new plant was commissioned in March
1933. The U. S. steamer Hyacinth was taken out of commission as a
spray boat in February 1937.
   The new hyacinth-destruction plant Kenny was constructed under
contract, and at the end of the fiscal year was being given final tests
prior to acceptance. Experimental work was carried on with a view
to improving present spraying methods and developing mechanical
means of removal.
   The total costs were $907,641.70, all for maintenance. The total
expenditures were $901,581.46.
   Proposed operations.-The unexpended balance at the end of the
fiscal year $14,620.74, plus the allotment of $76,000, made during
July 1937, will be applied as follows:
Accounts payable June 30, 1937_
                              ---------------------------------- $6, 060. 24
Maintenance (hired labor and Government plant) removal by floating
  plant July 1, 1937, to June 30, 1938.-----------                     56, 500. 00
Exclusion by structures, July 1, 1937, to June 30, 1938-               10, 000.00
Removal by hand, July 1, 1937. to June 30, 193S----------------  16, 000.00
Experimental work, July 1, 1937, to June 30, 1938---------------- 2, 060. 50

      Total ---------------------------------------------------        90, 620. 74
  The additional sum of $95,000 can be profitably expended (lduring
the fiscal year 1939, as follows:
Maintenance (hired labor and Government plant) removal by floating
  plant, July 1, 1938, to June 30, 1939-------------------------_        $67, 000
Exclusion by structures, July 1, 1938, to June 30, 19391_________--       10, 000
Removal by hand, July 1, 1938, to June 30, 1939_--                        18, 000

      Total for project                                      -   --           95,000
                             Cost and financial summiary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937---------------------------$907,          641. 70

      Total cost of permanent work to June 30, 1937---------          907, 641. 70
Minus accounts payable June 30, 1937-----                               6, 060. 24

      Net total expenditures ---        ____ ___-__ ___               901, 581. 46
Unexpended balance June 30, 1937------------------------------         14, 620. 74
      Total amount appropriated to June 30, 1937----------------      916, 202. 20
      RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                       767

               Fiscal year ending June 30                 1933           1934           1935              1936             1937


Cost of new work....
Cost of maintenance__.          ------------------- $58,   604. 95    $44, 556. 95
                                                                                         -----
                                                                                     $66, 528. 99
                                                                                                           -----
                                                                                                    $63, 784.76
                                                                                                                         ----------
                                                                                                                        $63, 722. 46
Total expended-------........    -.---..--.-        .   58,726. 21     44, 869. 51    27, 886. 34    59,336. 03          63. 499. 01

Allotted_---      --.   --- _____.._.-.-__..___         55, 523. 51    66, 752. 63    43, 789. 63    90, 600. 00        -14, 556. 64



Talance inexpended July 1, 1936-__                  __-_______-----------   - $92, 676. 39
Deductions              on account of revocation of allotment---------------14, 556.64

      Net amount to be accounted for ------------------------                                                         78, 119. 75
Gross amount expended-6-----______- -     __-____     $63, 635. 62
Less reimbursements collected_---------------------- 136. 61
                                                                                                                      63, 499.01

      Balance unexpended June 30, 1937,----------------------     14, 620. 74
Outstanding liabilities June 30, 1937_----__-___-__----     - -6, . 060.24

     Balance available June 30, 1937--__                __-----                                                        8, 560. 50
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------76,                                                              000. 00
     Balance available for fiscal year 1938_ .. __-              -   -
                                                                   _,_-                                               84, 560. 50
Amount that can be profitably expended in fiscal year ending
                                  - -- - - - - - - - - - - - - -
June 30, 1939, for maintenance                                                                                       95, 000. 00
    1Exclusive of available funds.

    28 ,. EIXAMINATION'S,                      SURVEYS, AND CONTINGENCIES                                 (GENERAL)

  The cost of work during the year amounted to $75.463.91; the ex-
penditulres were $71,976 68. The balance ulnexended June 30. 1937,
$4,408.11, plus anticipated allotments of $63,591.89. a total of $68,000,
will be applied as needed during the fiscal year 1938 to payment of
expenses incurred under this heading.
  The additional sum of $6%'.000 can be profitably expended during
the fiscal year ending June 30, 1939.
                                               Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937------                                  _________-_____                      $877, 510. 81
     Total cost of permanent work to June 30, 1937-------------877, 510. 81
Minus accounts payable June 30, 1937-------------------------      4,352.98
               Net total expenditures--__----------------------------                                              873, 157. 83
Unexpended balance June 30, 1937_-----------------                                   ----           -__                4. 408.11
               Total amount appropriated to June 30, 1937--------                                                  877, 565. 94

               Fiscal year ending June 30                 1933           1934           1935              1936             1937

Cost of new work-1
Cost of maintenance ------------------                  24,307.29     $ 6, 029. 91    48, 989. 41   855,741.     65     87 8,   463. 91
                                   24, 715. 29 35, 510. 04
Total expended____---------......................                                     46,474.85      55, 722. 16         71, 97.68
Allotted---.........-        ------------               44,331. 36     55,899. 99     52, 609. 34    50, 511.60          30. 907. 13

               20196-37-pt. 1-49
768              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936_____    _____                    $45, 477. 66
Amount allotted from War Department Appropriation Act approved
May 15, 1936---__----------------- ---------------------------- 31, 000. 00

     Amount to be accounted for______         ________________                                                              76,477. 66
Deductions on account of revocation of allotnent __ ____-__---                                                          -       92. 87

      Net amount to be accounted for_-      -_------------------ 76, 384. 79
Gross amount expended----------------------------- $4, 970.97
Less reimbursements collected------------------------2,994. 29
                                                                                                                            71, 976. 68

      Balance unexpended June 30, 1937________-_          -_________                                                         4, 408. 11
Outstanding liabilities June 30, 1937____-- __------__-_______                                                               4,.352.98

     Balance available June 30, 1937---------------- -----          55. 13
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------------45, 000. 00
      Balance available for fiscal year 1938 ........-                                                                      45,055.13
Amount that can be profitably expended in fiscal year ending June
                                  ------                     -- -
30, 1939, for maintenance 1_________      _     ___________                                                                62,.000. 00
1 Exclusive of available funds.

29. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE                                                                         SUBMITTED
                          [Commercial statistics for these projects are given in part 2 of report]

                                                                                   For last Cost and expenditures Estimated
                                                                                    full re-   to June 30, 1937    amount
No.                                Name of project                                port see
                                                                                   Annual                         required
                                                                                                                   ei
                                                                                    Report New work        Main-
                                                                                     for-                 tenance   plete

                                 1
      1   Bayou Terrebonne, La. .......................-------------------------     1936 $120, 088. 71 $121, 691. 31                (2)
      2   Little Caillou Bayou, La.'---....-..... .---            __       -         1936   77, 761. 04           26, 200.08         (2)
      3   Big Pigeon and Little Pigeon Bayous, La........----------                  1936  .------------......... 37, 669. 20        (2)
      4   Atchafalaya River, Morgan City to Gulf of Mexico,
            La.1            _____------------------------------------                1930       501,963.23       152,765.14          (2)
      5   Bayou Vermillion, La.'_.....-------------------------                      1936        34, 900. 00     161, 128. 38        (2)
      6   Bayou Queue de Tortue, La.l.....................                           1924        33, 355. 18       4, 276. 10        (2)

   1 Channels adequate for commerce.
  9  Completed.

      30. PLANT ALLOTMENT FOR FIRST NEW ORLEANS, LA., DISTRICT
                                               Cost and financial summary

Undistributed costs June 30, 1937------------_---___                                            __       ___-         $1, 161, 195.15
Plus accounts receivable June 30, 1937_ -----                                                                             102, 488. 56

     Gross total costs to June 30, 1937_-__-----L--                                                                    1,263, 683. 71
Minus accounts payable June 30, 1937-----------------                                                                     78, 790. 68

     Net, total expenditures----------------------------------                                                         1, 184,893.03
Unexpended balance June 30, 1937______L
                                 .--         ___-___-____-                                                                166, 717. 66

           Total amount appropriated to June 30, 1937 -------                                                    -     1, 351, 610. 69


      Fiscal year ending June 30                     1933            1934                1935                  1936               1937


Total expended----------................ ---------------                    $1, 150, 736. 76
                                                                   ----.......---..--..                 -$71, 217. 68           $105,373.95

Allotted ..... --------------------------------.........    _                       1, 253, 442. 02              33
                                                                                                         -28, 725.               126, 894. 00
    RIVERS AND HARBORS-FIRST NEW ORLEANS, LA., DISTRICT                                                                    769
Balance unexpended July 1, 1936__ -                                                                   -          $------ 197. 61
                                                                                                                 $145,
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934____-___     ___-___-  $19, 332. 62
Amount allotted from War Department Appropriation
Act approved Apr. 9, 1935__... _________------     4, 667. 38
Amount allotted from War Department Appropriation
Act approved May 15, 1936_____ ___----__         102, 894.00
                                                                                                                  126, 894. 00

       Amount to be accounted for_     ----------------------
                                       __                                                                         272, 091. 61
Gross amount expended---------------------------         989,450.33
Less :
    Reimbursements collected----------- $869,293.-09
    Receipts from sales __--________--       14, 783. 29
                                                                                    - 884, 076. 38
                                                                                                                  105, 373. 95

     Balance unexpended June 30, 1937__________-____-__                                                           166, 717. 66
Amount covered by uncompleted contracts----------------------                                                     160, 468. 43
     Balance available June 30. 1937--_--------------------                                                          6.249.23
Accounts receivable June 30, 1937                                                                                 1------------------------------
                                                                                                                   02,488. 56

        Unobligated balance available June 30, 1937- ----------                                                   108, 737. 79
                         31. DESIGN OF BAYOU SORREL LOCK
   An allotment of $20,000 was made from the appropriation for
flood control, Mississippi River and tributaries, carried in the War
Department Appropriation Act approved April 9, 1935, to be applied
to the making of preliminary surveys, design, and preparation of
specifications for a lock to be constructed in the Atchafalaya Basin
protection levees. The costs during the fiscal year were $494.17, and
the expenditures were $186.89. The total costs to the end of the
fiscal year were $2,634.80, and the total expenditures were $2,327.52.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $17,672.48, will be applied to further investigations and
design of the lock when a decision has been reached concerning the
grade of the levee line.
   Funds required for the fiscal year 1939 cannot be estimated until
the. design of the lock has been completed.
                                    Cost and financial summary
Cost of new work to June 30, 1937  -----------------------------                                                   $2, 634. 80
Cost of maintenance to June 30, 1937___
     Total cost of permanent work to June 30, 1937.--                                                               2, 634. 80
Minus accounts payable June 30, 1937--       -------                                        ------                     307. 28
     Net total expenditures ------------------------------------                                                    2, 327. 52
Unexpended balance June 30, 1937-------------------------------                                                    17, 672.48
        Total amount appropriated to June 30, 1937-------------_-                                                  20. 000.00

        Fiscal year ending June 30                1933               1934            1935                 1936           1937


Cost of new work---
                  ............-----------------------    ------------------------                    $2, 140. 63          $494. 17
Cost of maintenance___ ....... .......                                                                              __

Total expended                      _      ... .... 2,   140. 63
                 --------------............................-------186. 89
                     ..---------..
Allotted..................-----                 --....20,000. 00-
770         REPORT OF CHIEF OF ENGINEERS, U.                                            S. ARMY, 1937

Balance unexpended July 1, 1936 ---------------------                                           ___-__      $17,859. 37
Gross amount expended---------------------------------                                             $187.05
Less reimbursements collected-    --------------..----------                                           . 16
                                                                                                                  186. 89


      Balance unexpended June 30, 1937------                                        -          --     --      17, 672.48
Outstanding liabilities June 30, 1937_----------------------                                                      307. 28

         Balance available June 30, 1937--__------------___                               ___       _____     17, 365.20

       Status of reports called for by river and harbor acts and committee
                                    resolutions

                                                       Date trans-                                          Recommenda-
        Locality            Authorization act           mitted to                  Document no.                 tion
                                                         Congress



Boston Canal, Ver-      River and Harbor Act, Nov. 9,1936                                                   Unfavorable.
milion Parish, La.       Aug. 30, 1935.
Calcasieu River, La.....Rivers and Harbors July 15,1937                    House, 299, 75th Cong.,          Favorable.
                          Committee resolu-                                 1st sess.
                          tion, May 6. 1935.
DuLarge Bayou, La.... River and Harbor Act, Nov. 19, 1936                                                   Unfavorable.
                          Aug. 30, 1935.
Dupre Bayou, La....... .....do.................
                                              July 22,1937                 House,   321,     75th           Favorable.
                                                                            Cong., 1st sess.
Franklin Canal, St. .....do.................Feb. 25,1937                                                    Unfavorable.
  Mary Parish, La.
Grand Bayou Pass, La. Senate committee res-
                            olution, Aug. 6, 1937.
Grand Isle, La., beach River and Harbor Act, Sept. 24, 1936 House, 92, 75th Cong.,                          Favorable.
  erosion.               July 3, 1930.                       1st sess.
Houma. La., to Gulf of River and Harbor Act, Nov. 19, 1936                 --.---------------------         Unfavorable.
  Mexico. ship canal.    Aug. 30. 1935.
H ouma-Terrebon ne .....do-................  .....
                                                 do.......                                                     Do.
  Ship Canal. La.
Lafourche Bayou, La... Rivers and Harbors
                            Committee resolu-
                            tion, Mar. 29. 1937.
Lake Charles Deep River and Harbor                   July 15,1937          House, 299, 75th Cong.,          Favorable.
  Water Channel, La.        Act, Aug. 30, 1935.                             1st sess.
Lake Charles        Ship .....----
                               do...........--       ..... do.......     .....do..........-.-.-   .            Do.
  Canal, La., from Lake
  Charles to Gulf of
  Mexico.
La Loutre, St. Malo, .....-do .............---       June 18, 1937         House. 275, 75th Cong.,             Do.
  and YQcloskey Bay-                                                        1st sess.
  ous. La.
Mermentau River, La.      Rivers and Harbors
                            Committee resolu-
                            tion, June 19. 1936.
Mississippi River to In- Rivers and Harbors          Dec.      12,1936   ........................           Unfavorable.
  tracoastal Waterway       Committee resolu-
  via Bayou Manchac.        tion, Aug. 23, 1935.
  Amite River, Lake
  Maurepas. Pass Man-
  chac, Lake Maurepas.
  and Rigolets. La.
Mississippi River, vi- Rivers and Harbors
  cinity of New Orleans,    Committee resolu-
  La.                       tion, July 6, 1937.
     Do. --- . ... . . . River and Harbor
                            Act, Aug. 26, 1937.
New Iberia, La., to the River and Harbor
  Gulf of Mexico, deep      Act, Aug. 26, 1937.
  water channel.
Petit Anse, Tigre, and Rivers and Harbors            June 17,1937  River and Harbor Favorable.
  Carlin Bayous, La.        Committee resolu-                        Committee, 40, 75th
                            tion, Mar, 2, 1937.                      Cong., 1st sess.
    D o.-....... ........ Senate Committee res-      --....
                                                         do....... ....---               Do.
                                                                      do-------.............----...
                            olution, Mar. 11,
                            1937.
Pontchartrain Lake, Rivers and Harbors
La., harbor of refuge      Committee resolu-
at Port of New Or-         tion, Feb. 2, 1937.
leans, La.
Pontchartrain Lake, River and Harbor
  La., between New          Act, Aug. 26, 1937.
  Basin Canal and In-
  dustrial Canal, harbor
  of refuge.
 RIVERS AND HARBORS-SECOND NEW ORLEANS, LA., DISTRICT                                                                 771
      Status of reports called for by river and harbor acts and committee
                              resolutions--Continued

                                                        Date trans-                                          Recommenda-
       Locality            Authorization act             mitted to                  Document no.                 tion
                                                         Congress

Sennette Bayou, La__     River    and   Harbor        Jan. 14,1937 ........................ Unfavorable.
                          Act, Aug. 30, 1935.
Teche Bayou, La., up-    River    and   Harbor ...............----------------------......................
per portion (improve-    Act, Aug. 26, 1937.
ment of navigation
and flood control).
Terrebonne Bayou, La.,   Rivers. and Harbors          Jan. 21, 1937 .........--------...----....--........      Do.
between Houma and         Committee resolu-
Thibodaux.               tion, Feb. 27, 1936.
Vinton Waterway, La_     River    and   Harbor         Feb. 24,1937           House, 160, 75th Cong.,        Favorable.
                          Act, Aug. 30, 1935.                                    1st sess.
White Lake to Pecan ..... do-------------- Aug. 12,1936                       House, 78, 75th Cong.,            Do.
Island, La., waterway.                                                        1st sess.



IMPROVEMENT OF RIVERS AND HARBORS IN THE
      SECOND NEW ORLEANS, LA., DISTRICT
  This district embraces the watersheds of Bayou Pierre, Miss.;
Homochitto River, Miss.; Buffalo River, Miss.; and Bayou Sara, La.,
in western central Mississippi and in the northwestern portion of
Louisiana east of the Mississippi River, extending from just below
Vicksburg, Miss., to Baton Rouge, La., also in Louisiana west of the
Mississippi River from the south bank of the Red River from its
junction with the Mississippi River near Angola to Alexandria,
thence west to Wilda, including the watersheds of the Atchafalaya
River and tributary streams to Morgan City, La.
  District Engineer: Lt. Col. W. F. Tompkins, Corps of Engineers.
  Division Engineer: Brig. Gen. H. B. Ferguson, Corps of Engi-
neers.
                                 IMPROVEMENTS            (FLOOD CONTROL)
                                                                                                                      Page
1. Homochitto River, Miss--------         ------------------------                                                    771
2. Buffalo River, Miss--__------------------------- -              - -                                                772
3. Bayou des Glaises, La---------------------------------------                                                       772

                            1. HOMOCHITTO RIVER, MISS.

   Location.-Homochitto River in Adams and Wilkinson Counties,
Miss.
   Existing project.-This provides for the construction of small earth
dams at the head of minor tributaries and for channel improvements.
   Estimated construction cost, $50,000. Estimated cost of lands and
damages, $1,500. The existing project was adopted by the Flood
Control Act of June 22, 1936.
   Local cooperation.--See page 6. The conditions of local coopera-
tion will be fulfilled. The resolution of the Homochitto Drainage and
Development District, dated October 19, 1936, was approved by the
Secretary of War on February 11, 1937.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operations.-An allotment of $50,000 made during
August 1937 will be applied to completion of the project.
772      REPORT OF CIIEF OF ENGINEERS, U. S. ARMY, 1937

                        2. BUFFALO RIVER, MISS.

  Location.-Buffalo River in Wilkinson County, Miss.
  Existing project.-This provides for channel improvement, removal
of log jams, constructing minor cut-offs and earth dams, and reduc-
tion of flood heights. Estimated construction cost, $35,000. Esti-
mated cost of lands and damages, $850. The existing project was
adopted by the Flood Control Act of June 22, 1936.
   Local cooperation.-See page 6.
   It is very probable that conditions of local cooperation will be
fulfilled.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operations.-An allotment of $35,000 made during
August 1937, will be applied to completion of the project.
          -            3. BAYOU DES GLAISES, LA.
  Location.-Red River Basin, diversion ditch from Moreauville, La.,
to borrow pits of West Atchafalaya levee at Lake Bayou, La.
  Existing project.-To provide a controlled relief outlet for Bayou
des Glaises when the Bordelonville floodgate is closed. Estimated
construction cost, $280,000; estimated cost of lands and damages,
$5,000. Revised construction cost $241,000; revised lands and dam-
ages cost, $46,000. The existing project was adopted by the Flood
Control Act of June 22, 1936.
  Local cooperation.-See page 6.
  The conditions of local cooperation will be fulfilled.
   Condition at end of fiscal year.-Work has not been started.
  Proposed operations.-An allotment of $241,000 made during
October 1937 will be applied to completion of the project.
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          GALVESTON, TEX., DISTRICT
  This district includes the rivers and harbors in the State of Texas,
exclusive of the watershed of the Red River and its tributaries and
the watershed of the Brazos River above Washington, Tex. It also
includes Johnsons Bayou, La.
  District engineer: Lt. Col. E. H. Marks, Corps of Engineers.
  Division engineer : Col. F. B. Wilby, Corps of Engineers.
                                   IMPROVEMENTS

                                    Page                                         Page
1. Sabine-Neches Waterway,               8.     Double Bayou, Tex  --------     802
      Tex-----------------           773  9.     Anahuac Channel, Tex---- -      803
2. The Louisiana and Texas              10.     Cedar Bayou, Tex---------       804
      Intracoastal Waterwa y             11.                    -----------
                                                 Clear Creek, Tex                806
      from the Mississippi River
      at or near New Orleans,
                                         12.
                                         13.
                                                 Freeport Harbor, Tex ------
                                                 Channel from Aransas Pass
                                                                                 807

      La., to Corpus Christi,                      to Corpus Christi, Tex____    811
      Tex. (Sabine River-Corpus            14.   Channel from Pass Cavallo
      Christi section)_------- -     779           to Port Lavaca, Tex ____-     814
3. Galveston Harbor, Tex-----       783 15.     Port Aransas, Tex-----------_   816
4. Galveston Channel, Tex .--       787 16.     Brazos Island Harbor, Tex_      820
5. Channel from Galveston Har-          17.     Examinations, surveys, and
      bor to Texas City, Tex___      790           contingencies (general) _     824
6. Channel to Port Bolivar,             18. Other projects for which no
      Tex _               _
                   __------          793       estimates are submitted_          825
7. Houston Ship Channel, Tex_       795 19. Plant allotment__ ------            825
                RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                                       773
                                1. SABINE-NECHES                       WATERWAY,                  TEX.

   Location.-This is a consolidation of the old improvements of
"Harbor at Sabine Pass and Port Arthur Canal" and "Sabine-Neches
Canal,- including Sabine River to Orange and Neches River to Beau-
mont, Tex." Sabine Pass is on the Gulf of Mexico, approximately
58 miles east of Galveston and 280 miles west of Southwest Pass,
Mississippi River. It connects Sabine Lake with the Gulf of Mexico.
The Port Arthur Canal extends from near the upper end of Sabine
Pass to the Port Arthur docks at the mouth of Taylors Bayou, a
distance of 7 miles. Near its upper end the Sabine-Neches Canal
joins and extends to the mouths of the Neches and Sabine Rivers.
The waterway next extends up the Neches River to Beaumont and up
the Sabine River to Orange. (See U. S. Coast and Geodetic Survey
Charts Nos. 517 and 533.)
   Previous projects.-The original project for improvement of Sabine
Pass was adopted by River and Harbor Act of March 3, 1875, and
subsequent projects and modifications by River and Harbor Acts of
August 2, 1882, June 3, 1896, June 13, 1902, and June 19, 1906. The
Port Arthur Canal was conveyed to the United States free of cost
in 1906, and the River and Harbor Act of July 25, 1912, incorporated
it in the project. The Sabine and Neches Rivers were first improved
under the River and Harbor Acts of June 18, 1878, and March 3,
1899, and the Sabine-Neches Canal was first improved under the River
and Harbor Acts of March 3, 1905, and March 2, 1907. The project
was enlarged by the River and Harbor Acts of February 27, 1911,
July 25, 1912, March 2, 1919, and September 22, 1922.
   The cost and expenditures prior to the adoption of the existing
project were $7,560,508.29, of which $5,180,831.51 was charged to new
work and $2,379,676.78 charged to maintenance. In addition, $577,
506.78 was expended from contributed funds for new work, of which
$111,348.55 was for construction of the guard lock and $466,158.23 for
dredging. For further details see page 1863 of Annual Report for
1915 for the Sabine and Neches Rivers, Sabine Pass, and Port Arthur
Canal, and page 985 of the report for 1916 for Sabine-Neches Canal.
 (See also pp. 1100 and 1105 of Annual Report for 1921 and p. 874
of Annual Report for 1926. )
   Existing project.-The modified project dimensions provided for
in the various channels and basins comprising the waterway are
shown in the following tabulation:

                                                                                     Adopted project dimensions


      Section of Sabine-Neches Waterway, Tex.                                                                                  Depth in
                                                                                 Bottom width in feet                         feet below
                                                                                                                              mean low
                                                                                                                              Gulf level


Sabine Pass outer bar--------      --------------- 600-------------------------------------                                             36
Sabine Pass jetty channel _-- --_ -- - -400           at inner end, increasing to 600 at outer                                    (1)
                                                    end.
Sabine Pass .........             _-_-____ ...--------   -     ...-- 400_-   ------------------------           ------                  34
Sabine Pass anchorage basin__-----------------
Port Arthur Canal----
                    ................----------------------
                                                                     800 by 3,000 long, exclusive of channel_
                                                                     300-----------------------------------.......
                                                                                                                      -                 34
                                                                                                                                        34
Port Arthur:
    East turning basin ...................-----------------------    420 by 1,800 long ..............---------------.......             34
    West turning basin. ----------------------                       325 by 1,700 long ..........----           ----.......             34
  2134
     at inner end, increasing to 36 at outer end.
774          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                        Adopted project dimensions

    Section of Sabine-Neches Waterway, Tex.                                                                             Depth in
                                                                  Bottom width in feet                                 feet below
                                                                                                                       mgal low
                                                                                                                       Gulf level)

Channel from Port Arthur west turning basin to                                             34
                                                     125.....------------...............---------------
Taylors Bayou turning basin.
Taylors Bayou turning basin .....-----------------                                                     34
                                                     150 to 1,000 by 2,900 long ............---------------....
Sabine-Neches Canal:
    Port Arthur Canal to mouth of Neches River__     250_------................._--------------------........ 34
    Mouth of Neches River to mouth of Sabine         125--------------.................................       30
      River.
Neches River, mouth to Beaumont turning basin,       250.............................-------------------------------------      34
  including cut-offs.
Beaumont turning basin....---------------------      500 by 1,500 long_----    ---------....                                    32
Beaumont turning basin extension-- --.--   --        350 by 2,000 long--
                                                                       .----- ---------------                                   32
Sabine River, mouth to cut-off near Orange- ....        125-------------------------------------                                30
Sabine River to Orange municipal wharf .......--------- 200 by 3,000 long .---------------- ------                              30
                                                 150 .------------ ------------------------
Sabine River, cut-off to Orange turning basin......                                                                             25
Orange turning basin....----------------------- 500 by 1,500 long ...------------------------                                   25


   The project also provides for 2 rubble-mound stone jetties at the
Sabine Pass entrance from the Gulf of Mexico, the western jetty to
be 21,860 feet long and the eastern jetty to be 25,270 feet long. The
project further provides for the removal of the guard lock in the
Sabine-Neches Canal and the construction of suitable permanent
protective works along the Sabine Lake frontage owned by the city
of Port Arthur to prevent dredged material from entering Sabine
Lake and to prevent the erosion of the material deposited.
   The mean tidal variation at the entrance is about 11/ feet, at Port
Arthur about 1 foot, and at Orange and Beaumont about five-tenths
foot. The effect of the wind is often greater than that of the tide.
   The estimate of cost for new work revised in 1935, exclusive of
amounts expended on previous projects, is $11,060 000, made up as
follows: $7,704,500 for dredging work, of which $385,500 has been
contributed in cash and useful work performed; $2,755,500 for jetty
work; and not to exceed $600,000 for the construction of suitable
permanent protective work in Sabine Lake along Port Arthur. The
latest (1935) approved estimate for annual cost of maintenance
dredging is $600,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for the present di-
mensions of the jetties (H. Doc. No. 773, 61st Cong., 2d sess.) ; the
acts of September 22, 1922, January 21, 1927, August 30, 1935, and
August 26, 1937, provided for the dimensions of the channels and
turning basins (H. Doc. No. 975, 66th Cong., 3d sess.; S. Doc. No.
152, 67th Cong., 2d sess; H. Doc. No. 287, 69th Cong., 1st sess; Rivers
and Harbors Committee Doc. No. 27, 72d Cong., 1st sess; Rivers and
Harbors Committee Doc. No. 12, 74th Cong., 1st sess.; Rivers and
Harbors Committee Docs. Nos. 3 and 20, 75th Cong., 1st sess.); and
the act of March 3, 1925, provided for the removal of the guard
lock (H. Doc. No. 234, 68th Cong., 1st sess.). The latest published
map is in Rivers and Harbors Committee Document No. 3, Seventy-
fifth Congress, first session. Prior to adoption by the Rivers and
Harbors Act of August 30, 1935, the project modifications contained
in Rivers and Harbors Committee Document No. 27, Seventy-second
Congress, first session, had been authorized September 6, 1933, by
the Public Works Administration. The project is subject to the
conditions that no dredging shall be done by the United States within
50 feet of existing pierheads or established pierhead line.
             R1VERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                                 775
   Local cooperation.-The cooperation required by the River and
Harbor Act of August 30, 1935, consists of furnishing free of cost
to the United States all necessary rights-of-way and suitable areas
for the disposal of material excavated in the enlargement of all chan-
niels and basins from the Gulf of Mxico to the Beaumont turning
basin and for future maintenance as and when needed, and furiishing
releases from adjacent landowners covering damage to their property
that may result from the excavation and disposal of material as re-
quired by the Chief of Engineers.
   Maintenance of the branch channel was authorized by the River
and Harbor Act approved August 26, 1937, subject to the provision
that local interests furnish spoil-disposal areas for new work and
subsequent maintenance, and release the United States from all claims
for damages resulting from the maintenance dredging.
   These conditions have been partly complied with. The coopera-
tion yet to be met consists of furnishing rights-of-way and dumping
grounds along the Port Arthur Canal and Port Arthur turning
basins. .Local interests are actively engaged in securing the remain-
itig cooperation required. All prior requirements have been fully
complied with.
   Terminal facilities.--Modern terminal facilities adequate for pres-
ent commerce exist. (See p. 938, Annual Report for 1932, and Port
Series No. 14, Corps of Engineers.)
   Operations and results during fiscal year-New work.-The Sabine
Pass Channel, including anchorage basin, and inner end of the jetty
channel were dredged by contract from January 18 to June 30, 1937,
3,329,158 cubic yards of material being removed from a channel
length of 26,200 feet, at a cost of $295,877.77. The U. S. hopper
dredge Manhattan dredged the Sabine Pass outer bar and jetty chan-
nels from February 1 to April 10, 1937, and from June 11 to June
30, 1937, removing 2,452,470 cubic yards of material (bin measure-
ment) from a channel length of 26,900 feet, at a cost of $72,355.08.
Work was commenced March 13, 1937, under contract for construct-
ing bulkheads in Sabine Lake in front of Port Arthur, Tex. Under
this contract 34,597.92 square feet of reinforced concrete sheet piles
were driven in place at a cost of $38,718.23.
   Maintenance.-Miscellaneoussurvey work was done, and the Port
Arthur field office was maintained. The following dredging work
was done:


                                                                                                            Cubic
       Plant                       Locality                                  Date                           yards        Cost
                                                                                                           removed

U.    S.   pipe-line   Port Arthur Canal---------..........   Sept. 7-18, 1936, Dec. 22, 1936-              830, 555 $66, 917. 36
dredge Sam Hous-                                               Mar. 28, 1937.
ton.
   Do--.....---------..... Port Arthur east and west          Sept. 19-Dec. 21, 1936.........               436, 987   58, 489.88
                            turning basins and con-
                            necting channels.
                    Sabine-Neches Canal (Port
     Do-----------.............                               Aug. 1-Sept. 6, 1936-----------...........    232, 607   22, 208.91
                         Arthur Canal to Neches
                         River).
                    Neches River-------------
     Do-----------.............                               Apr. 18-May 14, 1937; May                     124, 240   24, 985. 52
                                                               21-31,1937.
                    Sabine-Neches
     Do-----------............        Canal                   May 15-20, 1937; June 1-30,                   189, 776   23, 575.18
                      (mouth of Neches River                   1937.
                         to mouth of Sabine River.)
U. S. hopper dredge    Sabine Pass outer bar jetty            Sept. 19-Dec. 20, 1936-......            11, 811,029     64, 088. 60
Benyaurd.               channels.

2Bin measurement.
776           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   A total of 3,625,194 cubic yards was removed from a total of
74,870 lineal feet of channels and basins at a cost of $260,215.45.
   Miscellaneous surveys and inspections were made at a cost of
$15.985.09.
   Repairs to the outer end of Sabine Pass east jetty were continued
under contract from July 1, 1936, to June 30, 1937. Under this
contract 3,258.8 tons of riprap (15 to 35 pounds), 280.75 tons of
broken stone (1/2 to 3 inches), and 6,642.58 cubic yards of concrete
were placed in the jetty, and 67 pieces of old cover stone were picked
up and replaced at a total cost of $202,553.48.
   The total cost of all work for the year was $885,705.10 of which
$406,951.08 was for new work and $478,754.02 for maintenance. The
total exnenditures were $782,024.47.
   Condition at end of fiscal year.-The Sabine Pass jetties are com-
pleted to full project dimensions. The existing project for dredg-
ing is about 80 percent completed. The work remaining to be done
consists of enlarging all channels and basins from near the sea buoy
in the Gulf of Mexico to, but not including, the Beaumont. turning
basin, except the Sabine Pass Channel and anchorage basin which
have been completed to project dimensions, and completing the coni
struction of bulkheads along the Sabine Lake frontage owned by the
city of Port Arthur, Tex.
   The controlling depths below mean low Gulf level in the various
channels and basins were as follows: Sabine Pass outer bar, 35.5
feet; Sabine Pass jetty channel, 36 feet; Sabine Pass Channel, in-
cluding anchorage basin, 36 feet; Port Arthur Canal, 33 feet; Port
Arthur east turning basin, 32.5 feet; Port Arthur west turning basini
33 feet; Taylor's Bayou turning basin, 32 feet; Sabine-Neches Canal
from head of Port Arthur Canal to mouth of Neches River, 32 feet;
Neches River, mouth to Beaumont turning basin, 32 feet; Beaumont
turning basin, 32 feet; Beaumont turning basin extension, 23 feet;
Sabine-Neches Canal from Neches River to Sabine River, 27 feet;
Sabine River, mouth to cut-off near Orange, Tex., 31 feet; Sabine
River to Orange municipal wharf 27 feet; Sabine River cut-off to
Orange turning basin 23.5 feet; and Orange turning basin 10 feet
 (extreme upper end).
   The total cost of the existing project to June 30, 1937, was as
follows:

                                                                      New work              Maintenance                 Total

Regular funds __ ._--------------------.--------------     .          $5, 131,088. 51      $5, 355, 227. 01           $10. 486, 315. 52
Public Works funds.-------              -------- ----------            1, 363, 652. 47 ..----------------............   1, 363, 652. 47
     Total United States funds_---------- ----------                   6, 494, 740. 98       5, 355, 227.01          11, 849, 967. 99
Contributed funds (existing project) --------------------
                                      _                                   353, 500.00      ---------------               353, 500.00

      Total (all funds)..............------------------------------    6, 848, 240.98         5, 355, 227.01         12, 203, 467. 99



  The total expenditures were $11,738,870.57 of which $10,375,218.10
was from regular funds, including $1,965.49 for Mississippi River
flood-relief work, and $1,363,652.47 from Public Works funds. In
addition $353,500 was expended from contributed funds for new
work.
          RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                   777
  Proposed operations.-the balance unexpended and accounts re-
ceivable at the end of the fiscal year, amounting to $1,803,524.86,
including an allotment of $995,200 made during July 1937 will be
applied as follows:
Accounts payable June 30, 1937_-----------------------------                    $111,224. 10
New work :
   Complete existing contract for constructing
     bulkheads in Sabine Lake opposite the city of
     Port Arthur, Tex. (July 1937 to February
      1939)               ----------------------- $462, 000. 00
   Complete dredging Sabine Pass outer bar ana
     jetty channels to project dimensions with U. S.
     seagoing hopper dredge (July and August,
      1937) -------------------------------------    48, 000. 00
   Complete existing contract for dredging Sabine
     Pass Chkannel, including anchorage basin and
     inner end of jetty channel (July 1937)_-------- 51, 000. 00
   Dredge Neches River Channel, mouth to Beau-
     mont turning basin, including cut-offs (August
       1937 to June 1938)      ---     _---------------         450, 000. 00
    Dredge Port Arthur Canal, Port Arthur east and
      west turning basins Taylors Bayou turning
      basin, approaches to these basins, and a por-
      tion of the lower end of the Sabine-Neches
      Canal, by contract (Sept. 1937 to June 1938)_             400, 000.00
    Balance available____--------------------------              42, 000. 00

      Total for new work ---------------            --        --------       1, 453, 000. 00
Maintenance :
   Complete existing contract for repairs to Sa-
      bine Pass east jetty (July 1937)-------------              30, 000. 00
   Dredge inland channels where necessary with
      an available U. S. pipe-line dredge (July to
      September 1937 and February, March, May,
      and June 1938)          __--                     ------   120, 000. 00
   Dredge Sabine Pass outer bar and jetty chan-
      nels with an available U. S. seagoing hopper
      dredge (February and March, 1938)----------- 48, 000. 00
   Port Arthur, Tex., field office miscellaneous and
      survey expenses (July 1937 to June 1938)                   41, 300. 76
                               --------------------------------
       Total for maintenance---_                                                 239, 300. 76
         Total for all work__-----------------------------------               1, 803, 524. 86
  The additional sum of $1,274,000 can be profitably expended dur-
ing the fiscal year 1939, as follows:
New work: Complete the Sabine;Neches Waterway project by
  dredging Sabine-Neches Canal from near the upper end of Port
  Arthur Canal to the mouth of Neches River, by contract (July
  1938 to June 1939) -----------------------------------------                  $700, 000. 00
Maintenance :
    Dredging inland channels where necessary with
      an available U. S. pipe-line dredge (July 1938
      to June 1939) ------------------------------ $254, 000. 00
    Dredge Sabine Pass outer bar and jetty channels
       with an available U. S. sea-going hopper dredge
       (March to June 1939) ----------------------- 96, 000. 00
    Repair Sabine Pass east jetty by extending the
      concrete cap shoreward, by contract (July 1938
      to June 1939)       _     ------- __      --- _ 184, 000. 00
    Port Arthur, Tex., field office miscellaneous and
      survey expenses (July 1938 to June 1939)- ---    40, 000. 00
                                                                 -              574, 000. 00

            Total for all work-------------------------_                       1,274,000.00
778             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                              Cost and financial summary

Cost of new work to June 30, 1937__-----                                                                         $11, 675, 572. 49
                                                                                                              1"--------------
Cost of maintenance to June 30, 1937-----------------------                                                         7, 734, 903. 79

      Total cost of permanent work to June 30, 1937_--------- 19, 410, 476. 28
Undistributed costs June 30, 1937   ...------------- ------------      114. 93

      Net total cost to June 30, 1937 ----         ____--------19, 410, 591. 21
Plus accounts receivable June 30, 1937 -----------------------           11. 75

     Gross total costs to June 30, 1937---------------------                                                            19, 410, 602. 96
Minus accounts payable June 30, 1937_------- --    --------                                                                 111, 224. 10

     Net total expenditures____-----------------------                                                          1219, 299, 378. 86
Unexpended balance June 30, 1937-------------------------                                                             808, 313.11
                                                       _
           Total amount appropriated to June 30, 1937-------                                                   1220,
                                                                                                               1     107, 691. 97

    Fiscal year ending June 30                      1933                1934             1935                 1936                 1937


Cost of new work------------.-.... .           .-...-..          - $803, 314. 20     $528, 383. 15        $31, 955. 12           $406, 951. 08
Cost of maintenance        -----------..........
                                       $381. 120. 53                220, 162. 17      175, 427. 54        205, 008. 52            478, 754. 02

        Total cost---------------.................381, 120. 53    1, 023, 476. 37      703, 810. 69       236, 963. 64            885, 705. 10
Total expended..................                338, 544. 77        934. 558, 09       646.984.37         301, 414. 43            782, 024. 47

Allotted.........................               542, 421. 44      1,490, 474. 78       188, 581. 73       376, 652. 47          1,070, 802. 01


Balance unexpended July 1, 1936_                                                                                             $519, 535. 57
Amount allotted from War Department Appropriation                                                       Act
approved May 15, 1936------------------------------                                                                      1,070, 802.01
      Amount to be accounted for                                   __                                                    1, 590, 337. 58
Gross amount expended _..___.___                                    __- __ -          _ $784,014. 01
Less reimbursements collected---                                                                989. 54
                                                                                         -1, 1---------
                                                                                                                              782, 024. 47
      Balance unexpended June 30, 1937      ___    __                                                                         808, 313. 11
Outstanding liabilities June 30, 1937-----------.$112, 556. 01
Amount covered by uncompleted contracts------ - 535, 583. 90
                                                                                                                              648,139. 91
      Balance available June 30, 1937---- ----------        --                                                           ,    160, 173. 20
Accounts receivable June 30, 1937  ----------------------------                                                                     11. 75

     Unobligated balance available June 30, 1937                                       ------------                          160,184. 95
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 ---------------------------------                                                                    995, 200. 00
     Balance available for fiscal year 1938----------------                                                              1,155, 348.95
Amount (estimated) required to be appropriated for comple-
tion of existing project ------------------------                                                                            700, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:  3- - -- -- - -- - -- - -- - -- - -- - - -- - -- - -- - -- - -- -                                   -
   For new work                                                                                                               700, 000. 00
                                                                   - - -- -- - -- -- - --
   For maintenance 3 - - - - - - - - - - - - - - - - - - - - - - -               ___                                          574, 000. 00

           Total 3             - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                                          1, 274, 000. 00
   1   In addition, $931 006 78 was expended for new work from contributed funds.
   1
   2 Includes $1,363,652.47 from Public Works funds.
     Exclusive of available funds.
        RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT               779
2. THE LOUISIANA AND TEXAS INTRACOASTAL WATERWAY FROM THE
  MISSISSIPPI RIVER AT OR NEAR NEW ORLEANS,            LA., TO CORPUS
  CHRISTI, TEX. (SABINE RIVER-CORPUS CHRISTI SECTION)

   Location.-This section of the Intracoastal Waterway will extend
from the Sabine River, about 3 miles below Orange, Tex., to Corpus
Christi, Tex., with a flood-discharge channel in the Colorado River
from Matagorda, Tex., to the Gulf of Mexico. The total length of
the waterway, exclusive of the length of the flood-discharge channel,
is about 2931/2 miles. The flood-discharge channel is about 7 miles in
length. (See U. S. Coast and Geodetic Survey Charts Nos. 1116,
1117, 1282, 1283, 1284, 1285, and 1286).
   Previous projects--Sabine River-Galveston Bay section.-None.
    (1) West Galveston Bay and Brazos River Canal, Tex., acts of
July 13, 1892, July 8, 1896, and June 13, 1902, the latter providing
for the purchase of the Galveston and Brazos River Canal, and the
act of March 2, 1907.
    (2) Channel between Brazos River and Matagorda Bay, Tex., acts
of June 25, 1910, and March 2, 1919. The act of July 25, 1912, pro-
vided for the construction of highway bridges at points where the
waterway intersected existing county roads.
    (3) Channel from Pass Cavallo to Aransas Pass, Tex., acts of
March 2, 1907, and July 25, 1912.
   For a full description of all previous projects see pages 941, 944,
and 947 of annual report for 1926. The total cost of all previous
projects prior to operation under the existing project to June 30,
1937, was $2,010,478.90, of which $534,161.70 was for new work,
$1,464,697.68 for maintenance, and $11,619.52 for operating and
care. The total expenditures on previous projects to June 30, 1937,
were $2,036,718.82, including $26,824.64 for operating and care under
the provision of the permanent indefinite appropriation.
   Existing project.--The existing project provides for a channel 9
feet deep at mean low water over a bottom width of 100 feet, with
a 1-foot overcut in artificial cuts and a 2-foot overcut in lakes, from
the Sabine River to Corpus Christi, Tex., for maintaining a suitable
flood-discharge channel in the Colorado River from Matagorda, Tex.,
to the Gulf of Mexico, for the purchase or construction of a 20-inch
pipe-line dredge, and for guard locks at the Brazos and Colorado
River crossings. From the Sabine River (3 miles below Orange,
Tex.) to the Port Arthur Canal and from Port Bolivar to the west
end of Galveston Channel, and from Aransas Pass to Corpus Christi,
the waterway passes through channels having dimensions larger
than those approved for this waterway.
   The mean tidal variation is 0.5 foot at Orange, 1 foot at Port
Arthur, 1.7 feet in Galveston Bay, 1.8 feet at Freeport, 1 foot in
Matagorda Bay, and 1 foot at Corpus Christi. The extreme ranges
of tide under ordinary conditions are 1 foot at Orange, 1.5 feet at
Port Arthur, 2.3 feet in Galveston Bay, 2.5 feet at Freeport, 1.5
feet in Matagorda Bay, and 1.5 feet at Corpus Christi. The height
of tides is dependent largely on the wind. Strong north winds have
depressed the water as much as 2 feet below mean low tide.
   The estimate of cost of new work, revised in 1927, is $9,600,000
 (including $600,000 for a dredge), exclusive of amounts expended
on previous projects. The latest (1937) approved estimate for
780     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

annual cost of maintenance is $560,000, including $12,000 for oper-
ating and care of bridges.
   The existing project was authorized by the following river and
harbor acts. The Act of March 3, 1925, adopted the section of the
waterway from the Sabine River to Galveston Bay; act of January
21, 1927, adopted the section from Galveston Bay to Corpus Christi,
Tex. (H. Doc. No. 238, 68th Cong., 1st sess.), and act of August 26,
1937, authorized the maintenance of a suitable flood-discharge chan-
nel in the Colorado River from Matagorda, Tex., to the Gulf of
Mexico (Senate Committee Print, 75th Cong., 1st sess.). Operating
and care of the waterway was included in the project July 1, 1935,
under the provisions of the Permanent Appropriations Repeal Act
approved June 26, 1934. The latest published maps are in the
above documents.
   Local cooperation.-The River and Harbor Acts of March 3, 1925,
and January 21, 1927 (H. Doc. No. 238, 68th Cong., 1st sess.), pro-
vided that local interests defray the cost of constructing or remodel-
ing all highway bridges, together with their subsequent maintenance
and operation, and furnish, without cost to the United States, all
rights-of-way and necessary spoil-disposal areas; that work on the
Sabine River-Galveston Bay section not be commenced until the
Secretary of War has received satisfactory assurances that there be
available, by the date of its completion, adequate vessels, terminals,
and auxiliary equipment for the economical handling of at least
400,000 tons annually; that the general carrier service required for
the New Orleans-Sabine River section be extended to terminals on
Galveston Bay, and at Houston; and that work on the Galveston
Bay-Corpus Christi section not be commenced until the Secretary of
War has received satisfactory assurances that there be available by
the date of its completion adequate vessels, terminals, and auxiliary
equipment for the economical handling of at least 300,000 tons an-
nually. The River and Harbor Act of August 26, 1937, provides
that the maintenance of the flood-discharge channel by the United
States shall be discontinued if the conditions of local cooperation for
the Intracoastal Waterway are not completely fulfilled by August
26, 1942. Local interests have complied with all requirements of
local cooperation for constructing the waterway from the Sabine
River to Galveston Bay and from Galveston westward through Gal-
veston County, and have furnished satisfactory assurances covering
terminals, vessels, and auxiliary equipment for the remainder of the
waterway. Local interests have also furnished some rights-of-way
west of Galveston County and are actively engaged in fulfilling the
remaining requirements of local cooperation. It is not known when
all requirements will be met.
   Terminal facilities.-There are terminal facilities at Orange, Port
Arthur, Galveston, Freeport, Port Aransas, and Corpus Christi,
where this waterway follows channels improved under other projects.
(See Port Series Nos. 6 and 14, Corps of Engineers.)
   Operations and results during fiscal year-New work (existing
project).--A payment of $3,300 was made in settlement of a claim
for work performed during the fiscal year 1935 in constructing the
Mud Bayou Railway Bridge near High Island, Tex.
        RIVERS AND HARBORS-GALVESTON,          TEX., DISTRICT      781

   Maintenance (existing project).-The U. S. pipe-line dredge Sam
Houston, from July 1 to 31, 1936, dredged 19,100 linear feet of the
section of the waterway between the Port Arthur Canal and Galves-
ton Bay, removing 221,181 cubic yards of material at a cost of
$18,565.71. Signs and channel markers were erected between the
Sabine River and Galveston Bay by hired labor and Government
plant, at a cost of $5,706.10. Under contract from February 27 to
March 25, 1937, the dike at the entrance to Galveston Bay near Port
Bolivar was repaired by extending the steel-sheet pile section shore-
ward a distance of 200 feet at a cost of $7,053.77. M'scellaneous sur-
verys and inspections were made at a cost of $14,322.23.
   Operating and care (existing project).-The Mud Bayou Railway
Bridge near High Island, Tex., was operated and maintained by hired
labor at a cost of $7,750.41.
   Operating and care (previous project).- The four highway bridges
 (Quintana, Bryan, Longs Bayou, and Caney Creek) over the 5 by
40-foot waterway between the Brazos River and Matagorda Bay were
operated and maintained by hired labor at a cost of $6,565 91.
   The total cost of all work during the fiscal year was 63,264.13,
of which $56,698.22 was for the existing project and $6,565.91 for the
previous project. The cost for the existing project consisted of
$3,300 fornew work, $45,647.81 for maintenance, and $7,750.41 for
operating and care. The cost for the previous project was all for
operating and care. The total expenditures were $81,599.18, of which
$75,100.44 was for the existing project and $6,498.74 for the previous
project.
   Condition at end of fiscal year (existing project).-The existing
project is about 37 percent completed. The waterway has been com-
pleted to project dimensions from the Sabine River westward
through Jefferson, Chambers, and Galveston Counties. A railway
bridge has been constructed at Mud Bayou, near High Island, Tex.
A steel-sheet pile and sand dike has been constructed at the Galveston
Bay entrance near Port Bolivar, Tex. To complete the project, the
waterway must be dredged to Corpus Christi, and locks must be
constructed at the Brazos River diversion channel and Colorado
River. Prosecution of the work cannot be undertaken until local
cooperation requirements have been met.
   The:controlling depths at mean low tide were 8 feet from the
Sabine River to Galveston Bay and 4 feet from Galveston Bay west-
ward through Galveston County.
   The total cost of the existing project to June 30, 1937, was $1,918,-
240 64, of which $1.233,995.77 was for new work, $200,900.87 for
maintenance, and $16,867.42 for operating and care from regular
funds, and $466,476.58 for new work from Public Works funds.
The total expenditures were $1,915,074.49, of which $1,448,597.91 was
from regular funds and $466,476.58 from Public Works funds. In
addition $6,348.34 was expended between July 1, 1934, and June 30,
1935, on the operating and care of the works of improvement under
the provision of the permanent indefinite appropriation for such
purposes.
   Previous projects.-The controlling depths at mean low tide in
the Inland Waterway maintained under previous projects were 11/2
782       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

feet from Galveston Bay to Freeport Harbor; 0 feet from Freeport
Harbor to Pass Cavallo; and 13/4 feet from Pass Cavallo to Aransas
Pass.
   The costs and expenditures on the previous projects are given in
paragraph, Previous projects.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $725,545, including an allotment of $720,000
made during July 1937, will be applied as follows:
Accounts payable June 30, 1937   ---------------------------    $3, 750. 87
Maintenance:
    Dredging where necessary between Port Arthur Canal and
      west boundary of Galveston County with Government plant
      (September 1937 to February 1938)---------------------   100,000,0000
    Dredging from Port Bolivar to Gilchrist, Tex., by contract
      (October 1937 to March 1938) -----------------------     101, 794. 13

Operation and care of bridges:
    Operation with hired labor (July 1937 to June 1938)--------      12, 000.00
    Ordinary maintenance and repair with hired labor (July
      1937 to June 1938) --------------------------------------       3,000.00
    Improvement and reconstruction with hired labor (July 1937
      to June 1938) ----------------------------------------          5, 000. 00
           Total for operation and care of bridges---------------    20, 000. 00

Balance   available -----------------------   ------------------- 500, 000.00
      Total ----------------------------          --------------    725, 545. 00
  The additional sum of $2,791,000 can be profitably expended during
the fiscal year 1939, as follows:
New work :
   Designing and preparing plans and specifications for constructing
    2 guard locks at each of Brazos and Colorado River crossings
     (July 1938 to June 1939) --------------------------------         $20, 000
   Dredging from the west boundary of Galveston County to Free-
     port Harbor and from Pass Cavallo to Aransas Pass by con-
     tracts (July 1938 to June 1939) -------------------------       1,780, 000
   Constructing 2 guard locks at Brazos River crossing by contract
     (January 1939 to June 1939) -------------------------             700, 000
         Total for new work-------------------------------          2, 500, 000
Maintenance:
    Dredging where necessary between High Island, Tex., and west
      boundary of Galveston County with Government plant (July
      1.938 to December 1938)---------------------------------         120, 000
   Dredging from Port Arthur Canal to High Island, Tex., by con-
      tract (July 1938 to December 1938) ------------------------      120, 000
    Dredging and snagging flood-discharge channel in Colorado River
      where necessary between Matagorda, Tex., and Gulf of Mexico
      with leased plant (July 1938 to June 1939) ----------------       18, 000
           Total for ordinary maintenance and improvement ------     2,758,000
Operation and care of bridges:
    Operation with hired labor (July 1938 to June 1939)                $12, 000
    Ordinary maintenance and repair with hired labor (July 1938
      to June 1939) ----------------------------------------              4, 000
    Improvement and reconstruction with hired labor (July 1938 to
      June 1939) --------------------------------------------            17,000
           Total for operation and care of bridges--                     33, 000
           Total for all work--------------_                         2, 791, 000
               RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                              783
                                         Cost and financial summary

Cost of new work to June 30, 1937----------------------- 1$2, 234, 634. 05
Cost of maintenance to June 30, 1937---------------------  1, 727, 258. 47

          Total cost of permanent work to June 30, 1937---------                                               3, 961, 892. 52
          Minus accounts payable June 30, 1937 -----------------                                                    3, 750. 87

Net total expenditures -------------------------------                                                     12 3, 958, 141. 65
Unexpended balance June 30, 1937-------------------                                                           -    5, 545. 00
                                                                                                           1
          Total amount appropriated to June 30, 1937________---                                             2 3, 963, 686. 65

          Fiscal year ending June 30                       1933               1934       1935          1936            1937

                   ...........---............ -------- $526, 934. 38 $493, 614. 07
Cost of new work---------                                                             $76, 841. 70 -----------        $3, 300. 00
Cost of maintenance--.........-----------------........... 51,877. 76  95, 096.43     104, 921. 89   $81,977. 07      59, 964. 13

       Total cost....----------------------            578, 812. 14    588, 710. 50   181,763. 59    81,977. 07       63. 264. 13

Total expended ..........-------------------           604, 132. 81    552, 394. 67   240, 165. 63   60, 957. 04      81,599.18

Allotted..--                --------------------       692, 041. 09    315, 543. 14   153, 583. 88   17, 751. 62       6, 500. 00


Balance unexpended July 1, 1936__--                __-------       __-                                             $80,644. 18
Amount allotted from War Department Appropriation Act ap-
                     ......-----------------------
proved May 15, 1936---                                      -----------                                            8, 500.00
      Amount to be accounted for- -- _____----------                                                               89, 144. 18
Deductions on account of revocation of allotment----------                                                          2, 000. 00

      Net amount to be accounted for--_-----------------------                                                      7,144. 18
Gross amount expended-----------------------------------                                                           81, 599. 18

      Balance unexpended June 30, 1937----------------------                                                        5, 545. 00
Outstanding liabilities June 30, 1937---------- --------------                                                      4, 004.00
     Balance available June 30, 1937_                                                                                 541.00
                                                                                                                   1_________----1,
Amount allotted during July 1937------------------------                                                         720, 000. 00

     Balance available for fiscal year 1938_--------- ---------                                                  721, 541.00
Amount (estimated) required      to be appropriated for      completion
                     - - --- - - - - --------- - - - - - - - ------ --- -
of existing project                                                                                           4, 900, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:   -  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -             -
   For new work                                                                                                2, 500, 000.00
                    -- - - -- -- -- --- -- -             -- -- -- -- --- --
   For maintenance a ___ __                                                                                       291, 000. 00

          Total        -------           ----------------------------------                                    2, 791, 000. 00
   1 Includes $466.476.58 from Public Works funds.
   2Includes  $33,172.98, operating and care under permanent indefinite appropriation.
   3 Exclusive of available funds.

                                    3. GALVESTON HARBOR, TEX.

  Location.-The entrance to this harbor is situated on the Gulf of
Mexico, on the northern portion of the coast of Texas, 328 miles west
of Southwest Pass of the Mississippi River and 278 miles northeast
from the mouth of the Rio Grande. (See U. S. Coast and Geodetic
Survey Chart No. 520.)
  Previous projects.-Adopted by River and Harbor acts approved
June 23, 1874, June 14, 1880, and August 5, 1886. Total cost and
     20196-37-pt. 1-50
784     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

expenditures under previous projects, including repairs made to
jetties damaged by storm of 1900, were $8,508,123.'29, of which $8,421,-
996.57 was for new work and $86,126 72 was for maintenance. For
further details see page 1854, Annual Report for 1915.
   Existing project.-This provides for two rubblestone jetties extend-
ing from Galveston Island (on the south) and Bolivar Peninsula (on
the north) into the Gulf of Mexico (the south jetty being 35,9C0 feet
long and the north jetty 25,907 feet long), and for a channel 800 feet
wide and 36 feet deep from deep water in the Gulf to a point between
the jetties 2 miles west of the seaward end of the north jetty, thence
800 feet wide and 34 feet deep to Bolivar Roads. The project also
provides for the maintenance by the United States of existing chan-
nels channelward of the harbor lines, 12 feet deep and 100 feet wide,
to the highway-ferry landings on Galveston Island and Bolivar Pen-
insula, and for the construction of 13 groins to protect the sea wall
along the Gulf shore from about Twelfth to Sixty-first Street, Gal-
veston, Tex.
   Under ordinary conditions the mean tidal range is 2 feet on the
outer bar and 1.64 feet on the inner bar. The extreme ranges are
2.76 and 2 27 feet respectively. The height of the tides is dependent
largely on the wind, and during strong northers in the winter season
the water surface may be depressed 2 feet below mean low tide.
   The estimated cost of new work, revised in 1935, is $2,795,000, of
which amount not to exceed $234,000 is applicable to the construction
of groins.
   The latest (1935) approved estimate of cost of annual maintenance
is $187,500, of which $7,500 is for channels leading to ferry landings.
   The existing project was authorized by the following River and
Harbor acts:
   The present jetties were authorized by the act of August 5, 1886
 (H. Doc. No. 85, 49th Cong., 1st sess.); their extension and the con-
struction and operation of a new dredge by the act of March 2, 1907
 (H. Doc. No. 340, 59th Cong., 2d sess., as modified by Rivers and
Harbors Committee Doc. No. 11, 59th Cong., 2d sess.), the deepening
of the channel to 35 feet, with width of 800 feet, for an experimental
period of 2 years, by the act of July 18, 1918 (H. Doc. No. 758, 65th
Cong., 2d sess.), the maintenance of channels 800 feet wide with
depths of 35 feet on outer bar and 34 feet on inner bar by the act of
January 21, 1927 (H. D-c. No. 307, 69th Cong., 1st sess.).
   The act of August 30, 1935, provided for the existing dredging
project (Rivers and Harbors Committee Docs. No. 31, 72d Cong., 1st
sess., and No. 57, 74th Cong., 1st sess.), and for the construction of
groins (H. Doc. No. 400, 73d Cong., 2d sess.). Prior to adoption
by the act of 1935 the project for maintenance of channels to 12-foot
depth contained in Rivers and Harbors Committee Document No. 31,
Seventy-second Congress, first session, was authorized September 6,
1933, by the Public Works Administration. The latest published
maps are in the three last-mentioned documents.
   Local cooperation.-Localinterests voluntarily furnished all neces-
sary rights-of-way for construction of groins in the Gulf of Mexico
along the sea wall at Galveston, Tex.
   Terminal facilities.-There are no terminals on Galveston Harbor,
but it is the entrance channel leading to extensive terminal facilities
        RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                785

located on Galveston Channel, Texas City Channel, and Houston Ship
Channel. (See Port Series No. 6, pt. I, Corps of Engineers.)
   Operations and results during fiscal year-New woork.-Work was
continued under contract for the construction of 10 groins along
the Gulf side of the Galveston sea wall. Four groins have been
completed, one of which was begun in the fiscal year 1936. The fifth
groin is about 75 percent complete. The total cost of this work
for the fiscal year was $91,505.84. By force account 325.31 tons of
stone were placed at the Gulf end of no. 1 groin at a cost of $2,593.67.
The U. S. seagoing hopper dredge Galveston between March 1 and
June 30, 1937, worked on deepening the channel to project depth of
36 feet from deep water in the Gulf to a point 2 miles west of the
seaward end of the north jetty, removing a total of 1,776,555 cubic
yards (bin measurement) at a cost of $76,973.64. The total cost of
all new work was $171,073.15.
   Maintenance.-Operationsin the channel leading to the highway
ferry landing on Bolivar Peninsula consisted of emergency removal
of shoals in February 1937 by the U. S. derrick boat No. 8 and re-
dredging of the channel by leased plant in the period May 19-27,
1937. The U. S. derrick boat No. 8 removed 2,000 cubic yards of
material at a cost of $2,709.43. By leased plant 49,574 cubic yards of
material were removed from a channel length of 1,700 feet at a cost
of $7,876.60. Between July 1 and August 7, 1936, the placing of an
asphaltic concrete cap on the south jetty was completed by leased
and United States plant and hired labor, 560.40 tons being placed
in a linear distance of 130 feet at a cost of $10,044.44. The U. S.
seagoing hopper dredge Galveston from August 1 to December 2,
1936, redredged the inner and outer bar channels, removing a total
of 1,122,728 cubic yards (bin measurement) at a cost of $60,336.16.
Miscellaneous surveys and inspections were made at a cost of
 $5,395.48. Total cost of maintenance for the year was $86,362.11.
   The total cost of all work for the year was $257,435.26 of which
 $171,073.15 was for new work and $86,362.11 for maintenance. The
total expenditures were $252,903.59.
   Condition at end of fiscal year.-The jetties were completed in 1910;
the 35-foot channel was completed in 1922. The existing project is
about 93 percent completed. The tidal scour, assisted by dredging,
had previously formed a channel between the jetties 32.5 feet deep at
mean low tide, and 1,450 feet wide between the 30-foot contours.
   The channels were dredged to project dimensions, except the outer
bar, which was dredged to a depth of only 35 feet. The deepening
of the outer bar to 36 feet is about 71 percent complete. The con-
tract for the construction of groins along the Gulf side of the Gal-
veston sea wall is 48 percent complete.
    The controlling depths below mean low tide were about 331/2 feet
in the inner bar channel, 351/2 feet in the outer bar channel, and 14
feet in the highway ferry channel.
    The total cost of the existing project to June 30, 1937, was $5,541,-
747.41, of which $2,612,985.26 was for new work and $2,928,762.15
for maintenance, including $13,121.45 from Public Works funds.
    The total expenditures were $5,530,142.67, of which $13,121.45 was
Public Works funds.
 786               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Proposed operations.--The balance unexpended at the end of the
fiscal year, amounting to $309,206.75, including an allotment of
 $100,000, made during July 1937, will be applied as follows:
Accounts payable June 30, 1937-------------------------------$11, 604. 74
New work :
     Complete the construction of 10 groins in the Gulf
      of Mexico along the Galveston, Tex., sea wall,
      under existing contract (July 1937 to April
      1938)-------     ----------------------------     $139, 068. 89
     Complete the deepening of outer bar from 35
      to 36 feet by United States seagoing hopper
      dredge during July 1937-----------------------      43, 026. 36

          Total for new work---------            --------- ------------ 182,095. 25
Maintenance:
    Dredging the inner and outer bar channels with an
       available United States seagoing hopper dredge
       (December 1937, February 1938, and May and
      June 1938) -----------------------------              $108, 006. 76
    Dredging the highway-ferry channels leading from
       Galveston Island and Bolivar Peninsula, by con-
       tract (March 1938) ----------------------               7, 500. 00
                 Total for maintenance----------------------------115, 506. 76

                 Total for all work........------------------------- --------- 309, 206. 75
  The additional sum of $187,500 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance:
    Dredging the inner and outer bar channels with an available
      United States seagoing hopper dredge (October 1938 to March
      1939)---------------------------------------------          $180, 000
   Dredging the highway ferry channels leading from Galveston
      Island and Bolivar Peninsula, by contract (March 1939)-----    7,500
                 Total for maintenance                          --------------------------------                             187, 500
                                              Cost and financial summary

Cost of new work to June 30, 1937                                                                                       034, 981. 83
                                                                                                                    $-----------------------1
Cost of maintenance to June 30, 1937---------------------3,                                                            014, 888. 87
     Total cost of permanent work to June 30, 1937----------14, 049, 870. 70
Minus accounts payable June 30, 1937-- ---------------------     11, 604.74

     Net total expenditures- --------------------------                                                               14, 038, 265. 96
Unexpended balance June 30, 1937-----------------                                                      ---------          209, 206. 75
            Total amount appropriated to June 30, 1937---- -------- 114, 247, 472. 71

     Fiscal year ending June 30                       1933                     1934             1935           1936           1937


Cost of new work_ .      -                    __----------------------------_--------------                     $831.68     $171,073.15
                           _
Cost of maintenance.._........                    $89, 900. 89           $117, 267. 69        $75, 479. 78   358, 778. 94     86, 362. 11
        Total cost      ----------------           89, 900. 89              117, 267. 69       75, 479. 78   359, 610. 62    257, 435. 26

Total expended------------....           -.     -18, 089. 54                115, 001. 03       67, 714. 99   369, 252. 80    252, 903. 59
Allotted-------......... -   --   ----
                                  __               84, 923. 13               77, 829. 53      295, 121. 45   508, 500. 00   -28, 454. 47

    1 Includes $13,121.45 Public Works funds for maintenance.
          RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                      787

lalance unexpended July 1, 1936-__---                               $490, 564. 81
Amount allotted from War Department Appropriation Act ap
  proved May 15, 1936___    ------------------------------           120, 000. 00
      Amount to be accounted for--------------------                 610, 564. 81
Deductions on account of-
   Refund of advanced funds_ -------------    $100,000.00
   Revocation of allotment _---  ____------     48, 454. 47
                                                                     148, 454. 47

      Net amount to be accounted for___---_---------------           462,110. 34
Gross amount expended_____-
                         ------------            $253,692.19
Less reimbursement collected ---------------       -788.   60
                                                                     252, 903. 59

      Balance unexpended June 30, 1937.__-__--------------           209, 206. 75
Outstanding liabilities June 30, 1937------------$11, 609. 74
Amount covered by uncompleted contracts-------- 121,959. 38
                                                                     133, 569. 12

     Balance available June 30, 1937_-___-____--------                75, 637. 63
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937-----___---------------------             100, 000. 00

     Balance available for fiscal year 1938_________-------------    175, 637. 63
Amount that can be profitably expended    in fiscal year ending
                                 - --- --    -- --- ---- -
June 30, 1939, for maintenance 2____ ___ _____                      187, 500. 00
  2 Exclusive of available funds.

                         4. GALVESTON CHANNEL, TEX.

   Location.-This channel extends from a point in Galveston Har-
bor between Bolivar Peninsula and Fort Point across the former
inner bar to and along the wharf front of Galveston, and has a
length of about 5 miles and a width of 1,200 feet. (See U. S. Coast
and Geodetic Survey Chart No. 520.)
   Existing project.-This provides for a channel 34 feet deep at
mean low tide and 1,200 feet wide from Bolivar Roads (outer end
of the old inner bar near Fort Point) to Forty-third Street, thence
to Fifty-first Street with a width of 1,200 feet and 32 feet deep, in
the city of Galveston, and for its extension, when the interests of
navigation and commerce require it, with a width of 1,000 feet and
depth of 32 feet at mean low tide, to Fifty-seventh Street in the city
of Galveston, and for an extension of the sea wall, which lies along
the Gulf front of Galveston, from its angle at Sixth Street and
Broadway to the south jetty, with protection at its junction with
the south jetty, this extension of the sea wall being for the purpose
of protecting the outer end of the channel from the effects of
hurricanes.
   Under ordinary conditions the mean tidal range is about 1.1 feet
and the extreme range about 1.6 feet. The height of tide is depend-
ent largely on the wind, and during strong north winds in the winter
season the water surface may be depressed 2 feet below mean low
tide.
   The estimated cost of new work on the channel, revised in 1935, is
$3,116,000, and of the sea-wall extension, revised in 1922, $2,986,000.
The latest (1935) approved estimate for annual cost of maintenance
of the channel is $260,000.
788     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the excavation
of the channel 1,200 feet wide and 30 feet deep from outer end of
inner bar to Fifty-first Street (H. Doc. No. 264, 56th Cong., 2d
sess.) ; act of March 3, 1905, provided for the purchase or construc-
tion of a hydraulic pipe-line dredge; act of March 2, 1907, provided
for the extension of the channel from Fifty-first Street to Fifty-
sixth Street, with a width of 700 feet and a depth of 30 feet (H.
Doc. No. 768, 59th Cong., 2d sess.); act of June 25, 1910, provided
for the extension of the channel at such time as the interests of
navigation and commerce demand to Fifty-seventh Street, with a
width of 1,000 feet and depth of 30 feet between Fifty-first and
Fifty-seventh Streets (H. Doc. No. 328, 61st Cong., 2d sess.); act
of July 27, 1916, provided for the extension of the sea wall from
angle at Sixth Street and Broadway to a point abreast of the nearest
battery at Fort San Jacinto (H. Doc. No. 13'90, 62d Cong., 3d sess.) ;
act of September 22, 1922, provided for the further extension to
junction with the south jetty and protecting it at this junction and
for repairing the sea wall in front of the Fort Crockett Reservation
 (H. Doc. No. 693, 66th Cong., 2d sess.); act of January 21, 1927,
provided for a 32-foot project depth (H. Doc. No. 307, 69th Cong.,
1st sess.) ; and the act of August 30, 1935 (Rivers and Harbors Com-
mittee Doc. No. 61, 74th Cong., 1st sess.) provided for a depth of 34
feet from Bolivar Roads to Forty-third Street. The latest maps
are published in the Annual Report for 1914, page 2285, and in
River and Harbor Committee Document No. 61, Seventy-fourth
Congress, first session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminal facilities at Galveston are the
most extensive on the Texas coast. They are located almost entirely
on the south side of the channel and, extend from Tenth Street to
Forty-fifth Street, a distance of 21/ miles. The wharf system has
sufficient capacity to furnish berthage for about 79 average-size
ocean-going freight carriers at one time. The terminal facilities at
Galveston are considered adequate for existing commerce.          (For
further details see Port Series No. 6, part I, Corps of Engineers.)
   Operations and results during fiscal year--New work.-Work was
commenced May 27, 1937, under a contract providing for both new
work and maintenance dredging of the channel from near Fort Point
to Forty-third Street; Galveston, and 192,160 cubic yards of material
classed as new work were removed at a cost of $11,659.96.
   Maintenance.-Underthe contract above mentioned, 384,321 cubic
yards of material classed as maintenance were removed at a cost
of $23,563.69. A small force was occasionally employed in main-
tenance of the sea-wall extension and making repairs to the brick
pavement, at a total cost of $4,452.94. There were additional costs
amounting to $5,205.59 for miscellaneous surveys and inspections.
The total cost of maintenance for the year was $33,222.22.
   The total cost of all work for the year was $44,882.18, of which
 $11,659.96 was for new work and $33,222.22 for maintenance. The
total expenditures were $12,303.13.
   Condition at end of fiscal year.-At the end of the fiscal year
the channel dredging was about 64 percent completed and the entire
                 RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                                              789

project was about 86 percent completed. The sea-wall extension,
with fill and paving, was completed in 1926. The channel was com-
pleted to a depth of 32 feet from the outer end of the old inner bar
at Fort Point Light to Forty-third Street in the fiscal year 1929.
The work remaining to be done to complete this project is the dredg-
ing of the channel to a depth of 34 feet from the old inner bar at
Fort Point to Forty-third Street and to a depth of 32 feet from
Forty-third Street to Fifty-seventh Street with 1,200 feet width
from Forty-third Street to Fifty-first Street, and 1,000 feet width
from Fifty-first Street to Fifty-seventh Street, the work on this
last-named section being contingent on the development of the water-
front facilities on the Chicago, Rock Island & Gulf Railway and
adjacent properties.
   The controlling depth in the channel was about 31 feet at mean
low tide for a least width of 600 feet.
   The total cost of the existing project to June 30, 1937, was as
follows:

                                                                                      New work             Maintenance               Total

United States funds:
   Channel...-------------...-----------......-----------..                           $1, 622, 534. 15     $3, 399, 755. 88        $5, 022, 290. 03
     Sea wall........-------......-----------...---..............-------------.....    2, 289, 213. 54          97, 894. 70         2, 387, 108. 24

     Total United States funds___      ........------.....---------.....               3, 911, 747. 69      3, 497, 650. 58         7, 4i~9,398. 27
Contributed funds----...------..............--------------------....                      710, 274. 77-..---------                  -710, 274. 77

        Total ........--------------------
                              ..................-...........-----------------          4, 622, 022. 46      3, 497; 650. 58         8, 119, 673.04



   The total expenditures were $7,416,437.31. In addition $710,274.77
was expended from contributed funds for sea-wall construction.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $281,075.90, including an allotment of
$65,600 made during July 1937, will be applied as follows:
Accounts payable June 30, 1937__ _---_                                                                                            $33, 878. 66
New work: Complete the deepening of channel from 32 feet to 34
feet, by contract (July to October 1937) _____________________                                                                    48, 340.04
Maintenance:
    Complete the dredging of channel by contract
       (July to October 1937) ---------------------- $187, 000. 00
    Maintenance of sea-wall extension slope and pave-
      ment with hired labor and Government plant
       (July 1, 1937, to June 30, 1938)--------------   8, 857. 20
    Operation of dragline machine, constructing levees
      with hired labor and Government plant (April
      to June 1938) -------                             3, 000. 00
                     Total for maintenance-------------------------------                                                         198, 857. 20
                     Total for all work-----------------------------------                                                        281, 075. 90
   The additional sum of $260,000 can be profitably expended in the
fiscal year 1939, as follows:
Maintenance:
   Dredging the channel by contract (March to June 1939)--------- $252, 000
   Maintenance of sea-wall-extension slope and pavement by hired
      labor with Government plant (July 1, 1938, to June 30, 1939)-__ 8, 000

                     Total -----                            -------                              ---- __        -             -       260, 000
790                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                     Cost and financial summary
Cost of new work to June 30, 1937,--------___                                           -------          __              __-           $3, 911, 747. 69
Cost of maintenance to June 30, 1937_                                               -------------------                                 3, 497, 650. 58
      Total cost of permanent work to June 30, 1937 --------                                                                         7, 409, 398.27
Undistributed costs June 30, 1937____ ______-_____-          -                                                                     -___ 40, 917. 70
      Net total cost to June 30, 1937- -______--__--7,                                                                                     450, 315. 97
Minus accounts payable June 30, 1937--__--_-      --                                                        ---- __                      -- 33, 878. 66
     Net total expenditures-----------------------------7, 416, 437. 31
Unexpended balance June 30, 1937-----------        -215,
                                            _____-__-           475.90
           Total amount appropriated to June 30, 1937--------_----                                                                       7,631, 913. 21

           Fiscal year ending June 30                                   1933             1934               1935                  1936          1937

Cost of new work----.............-----------..--------------                              --------... ---....------------......               $11, 659.96
Cost of maintenance-----.                              ......------------------
                                                                      $15, 623.05    $248, 398. 15      $65, 549.92 $204,435. 61               33, 222. 22

        Total cost.........-----------................----------..    15, 623. 05     248, 398. 15       65, 549. 92       204, 435. 61        44, 882. 18

Total expended------------.......................---------------. -94, 169. 84        248, 667. 80       38. 031. 11       211, 464. 66        12, 303. 13
Allotted------.......-------.--------.                               119, 721.40      103, 831. 61     113, 860.20         222, 000.00         60,000.00


Balance unexpended July 1, 1936 _______________________                                                                                  $167, 779. 03
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936--------------------------------    -                                                                                  60, 000.00
      Amount to be accounted for-__, _________   -_____                                                                            -      227,779. 03
Gross amount expended---- --------------------------------                                                                                 12, 303. 13
      Balance unexpended June 30, 1937-          __ -  __-----                                                                            215, 475. 90
Outstanding liabilities June 30, 1937------------$35, 437.98
Amount covered by uncompleted contracts------- 170, 386.90
                                                                                                                                          205, 824. 88
     Balance available June 30, 1937 -------------------------                                                                               9,651.02
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------                                                                                  65, 600.00
       Balance available for fiscal year 1938____--                  _-75,                                                                     251. 02
Amount (estimated) required to be appropriated for completion
                          -  -- -- - -- - - -- - -- - -- - -- - -- - - -- - -- - -- -
  of existing project 2                                                                                                                 1, 430,000. 00
Amount that can be profitably expended in fiscal year ending
                                         --
June 30, 1939, for maintenance 2 -____________________________                                                                           260, 000. 00
   1
2 In adlition, $710,274.77 was expended from contributed funds.
   Exclusive of available funds.
       5. CHANNEL FROM GALVESTON HARBOR TO TEXAS CITY, TEX.

   Location.-Texas City is on the mainland of Texas on the west
side of Galveston Bay, about 10 miles northwest of the city of Gal-
veston. (See U. S. Coast and Geodetic Survey Charts Nos. 520 and
1282.)
   Previous projects.-Adopted by River and Harbor Act approved
March 3, 1899, and enlarged by River and Harbor Act approved
June 25, 1910 (H. Doc. No. 328, 61st Cong., 2d sess.). The cost and
expenditures prior to the beginning of the present project in 1913
were $561,905.69, of which $366,822.48 was for new work and $195,-
083.21 was for maintenance. (For further details see p. 1856, Annual
Report for 1915.)
        RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT               791

  Existing project.-This provides for a channel 34 feet deep at
mean low tide and 300 feet wide on bottom from deep water in Gal-
veston Harbor to the harbor at Texas City, a distance of about 6
miles, with a pile dike on its north side 28,200 feet long covered with
clay and other material dredged from the channel, with a harbor
800 feet wide on bottom and 34 feet deep at mean low tide extending
approximately 4,250 feet to the southward of the south property line
of the Texas Sugar Refining Co., and for the construction of a
rubble-mound dike a short distance south of the existing pile dike
and extending between stations -1+600 (the shore) and 26+000,
a distance of 27,600 feet. Under ordinary conditions the mean tidal
range is about 11/4 feet and the extreme range is about 11/ feet. The
height of tide is dependent largely on the wind, and during strong
"northers" in the winter season the water surface may be depressed
2 feet below mean low tide.
  The estimate of cost for new work, revised in 1937, is $2,365,000,
exclusive of amounts expended on previous projects but inclusive of
$28,740.68 contributed by local interests. The latest (1937) approved
estimate of cost of annual maintenance of the channel and dike is
$144,500.
   The River and Harbor Acts of March 4, 1913 (H. Doc. No. 1390,
62d Cong., 3d sess.), and August 30, 1935 (Rivers and Harbors Com-
mittee Doc. No. 4, 73d Cong., 1st sess.; Rivers and Harbors Committee
Doc. No. 46, 73d Cong., 2d sess.; and Rivers and Harbors Committee
Doc. No. 62, 74th Cong., 1st sess.), provided for all features of the
existing project except the southerly extension of the harbor and the
original rubble-mound dike. The southerly extension of the harbor
and original rubble-mound dike were authorized by the River and
Harbor Act of July 3, 1930 (H. Doc. No. 107, 71st Cong., 1st sess.),
and the River and Harbor Act of August 26, 1937 (Rivers and Har-
bors Committee Doc. No. 47, 75th Cong., 1st sess.).
   Extension of the rubble-mound dike to the shore (Rivers and Har-
bors Committee Doc. No. 4, 73d Cong., 1st sess.) was authorized by
the Public Works Administration September 6, 1933, and adopted
by the River and Harbor Act of August 30, 1935. The latest pub-
lished maps are found in the project documents. The project is
subject to the conditions that no dredging shall be done by the United
States within 75 feet of any pierhead line or structure.
   Local cooperation.-Under the provisions of the River and Harbor
Act of August 26, 1937, local interests are required to furnish free
of cost to the United States necessary rights-of-way and suitable
spoil-disposal areas for new work and for subsequent maintenance
as required and release the United States from claims for damages
attributable to the work of improvement and furnish assurance satis-
factory to the Secretary of War that they will construct a common-
carrier oil terminal substantially as proposed. Prompt compliance
with these requirements is anticipated. All prior requirements have
been fully complied with.
   Terminal facilities.-Modern terminal facilities are located on the
mainland at the inner end of this channel and are considered ade-
quate for existing commerce. (See Port Series No. 6, pt. 3, revised
1935, Corps of Engineers.)
   Operations and results during fiscal year--New work.-Under a
contract providing for both new work and maintenance dredging, the
792               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

channel and basin were dredged to project dimensions during the
period October 23, 1936, to February 4, 1937, and 1,846,051 cubic
yards of material classed as new work were removed from a channel
and basin length of 36,315 feet, at a cost of $122,914.04.
   Maintenance.-Under the contract above mentioned, 980,015 cubic
yards of material classed as maintenance were removed at a cost of
$66,001.43. Miscellaneous surveys and inspections were made at a
cost of $3,610.49. The total cost of all maintenance work for the year
was $69,611.92.
   The total cost of all work for the year was $192,525.96, of which
$122,914.04 was for new work and $69,611.92 for maintenance. The
total expenditures were $193,138.14.
   Condition at end of fiscal year.-The existing project is 95 percent
completed. The work remaining to be done is the extension of the
Texas City, Tex., harbor 1,000 feet southward as authorized by the
River and Harbor Act of August 26, 1937. The channel and the
harbor basin, except the authorized extension referred to above, were
completed in 1936. The pile dike was completed in 1915, the rubble-
mound dike in 1934. The controlling depth in the completed por-
tion of the project channel and basin was 331/. feet at mean low
tide. The total cost of the existing project to June 30, 1937, was as
follows:

                                                                                           New work            Maintenance           Total


Regular funds _                                         $2, 151, 680. 52          $2, 934, 388. 91 $5, 086, 069. 43
                                             __-_-_-----------------------------------
Public Works funds..---------------------------------136, 295. 78 ----------------                     136, 295. 78
     Total United States funds--- _.----. --..                               --.-.     -
                                                                                     ___   2, 287, 976. 30      2. 934, 388. 91    5, 222, 365. 21
Contributed funds ......
                      ----------------------------------                                       28, 740. 68   ----------------          28, 740.68
       Total all funds-------------------------------...................................   2, 316, 716. 98      2, 934, 388. 91    5, 251, 105.89



   The expenditures were $5,222,365.21, of which $5,086,069.43 was
from regular funds and $136,295.78 from Public Works funds. In
addition, $28,740.68 was expended from contributed funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $22,126.84, including an allotment of $20,200
made during July 1937, will be applied as follows:
Maintenance:
   Repairs to rubble-mound dike with hired labor
      and Government plant (April to May 1938)------------------ $17, 000. 00
    Surveys of channel (July 1937 to
      June 1938) ------------------------------------------------  5, 126. 84
   Total-------------------------------------------------------                                                                    22, 126. 84
   The additional sum of $253,500 can be profitably expended in the
fiscal year 1939 as follows:
New work: Extension of the harbor basin 1,000 feet to the south-
ward, with depth of 34 feet, by contract (July to October 1938)_ $112, 000. 00
Maintenance: Dredging the channel and basin by contract (Octo-
ber 1938 to February 1939) ------------------------------------ 141, 500. 00
           Total for all work                                       -------------                                                 253, 500. 00
             RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                                      793
                         Cost and financial summary
Cost of new work to June 30, 1937    1      1------------------                                     -1    1,   2   $2, 654, 798. 78
Cost of maintenance to June 30, 1937-------------------------                                                       3, 129, 472. 12

          Total cost of permanent work to June 30, 1937 _________                                                   5, 784, 270. 90

     Net total expenditures-------------------------------                                                     1,2 5, 784, 270.90
Unexpended balance June 30, 1937_---------------------------                                                            1, 926. 84
          Total amount appropriated to June 30, 1937                                                             5, 786, 197. 74
                                                                                                         -121----------

    Fiscal year ending June 30                    1933              1934               1935              1936               1937


Cost of new work....              -------------
                           ......----      ..   .       __       $136, 295. 78   -----------                              $122, 914. 04
Cost of maintenance-      ----- ----        $133, 571. 47           3, 455. 16     $123, 011. 66     $8, 416. 16            69, 611. 92

       Total cost....       .....--------------.. 133, 571. 47    139, 750. 94       123, 011. 66        8, 416. 16        192, 525. 96
Total expended...-----------------              96, 792. 83       140, 092. 98       123, 159. 82        7, 803. 98        193, 138. 14
Allotted--------.........---------__            61, 664. 17       217, 934. 66        50, 000. 00    76, 000. 00            73, 073.91


Balance unexpended July 1, 1936 ---------------------                                                                 $121, 991.07
Amount allotted , from War Department Appropriation                                                 Act
  approved May 15, 1936--------------------------------                                              _                 124, 000. 00

      Amount to be accounted for---------------------------                                                            245, 991. 07
Deductions on account of revocation of allotment -------------                                                          50, 926. 09

         Net amount to be accounted for--                                           _
                                                                                 ________----                          195, 064. 98
Gross     amount expended -,------                                                                                     193, 138. 14
     Balance unexpended June 30, 1937 _________________-_                                                                1,926. 84
Amount allotted from War Department Civil Appropriation Act
   approved        July     19,     1937__                       ______________________                                 20,200. 00

     Balance available for fiscal year 1938 --------                                                                    22, 126. 84
Amount (estimated) required to be appropriated for comple-
tion of existing project -----------------------------------                                                          112, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 3- - - - - - - - - - - - - - - - - - - -                                                               112, 000. 00
   For maintenance 3- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- _                                   141, 500. 00
         Total 3 - -       -- -- -- --- --
                                                           __                                                          253, 500.00
   1In addition. $28,740.68 was expended from contributed funds.
   2 Includes $136,295.78 from Public Works funds.
   " Exclusive of available funds.
                            6. CHANNEL TO PORT BOLIVAR, TEX.

   Location.-Port Bolivar is at the end of Bolivar Peninsula, which
is on the east coast of Texas, between the Gulf of Mexico and Gal-
veston Bay. It is on Galveston Harbor and about 4 miles north of
the city of Galveston. (See U. S. Coast and Geodetic Survey Chart
No. 520.)
   Previous projects.-Adopted by the River and Harbor Act of
March 2, 1907. The cost and expenditures were $94,811.50, of which
$48,710.75 was for new work and $46,100.75 for maintenance. For
further details see page 1856, Annual Report for 1915.
   Existing project.-This provides for a channel 30 feet deep at
mean low tide and 200 feet wide on bottom, beginning at deep water
794       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

in Galveston Harbor and extending to a turning basin 1,600 feet long,
with an average width of about 750 feet and 30 feet deep at mean
low tide in front of the wharves. Under ordinary conditions the
mean tidal range is about 1.7 feet and the extreme range about 2.3
feet. The height of tides is dependent largely on the wind, and
during strong "northers" in the winter season the water surface may
be depressed 2 feet below mean low tide.
   The estimated cost of new work, revised in 1928, is $187,000, exclu-
sive of amount expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance of the channel and
turning basin is $20,000, which provides for a depth of 20 feet in the
channel and 20 feet in the turning basin, 500 feet square, these dimen-
sions being sufficient to accommodate existing commerce which con-
sists of the operation of a railway ferry.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for all except the present,
dimensions of the turning basin (H. Doc. No. 328, 61st Cong., 2d
sess.), and the act of March 2, 1919, provided for the present dimen-
siols of the turning basin (H. Doc. No. 1122, 65th Cong., 2d sess.).
The latest published map is in the last-mentioned document.
   Recommended modifications of project.-Under date of June 24,
1926, the Chief of Engineers recommended that the project be cur-
tailed by providing for a channel depth of 20 feet, 200 feet wide,
with a turning basin of the same depth 500 feet square (H. Doc. No.
467, 69th Cong., 1st sess.).
    Terminal facilities.-The terminals consist of two piers, one 400
feet wide by 1,200 feet long and the other 1.200 feet long by 210
feet wide. The facilities are considered adequate for the existing
commerce.
    Operations and results during fiscal year.-Miscellaneous surveys
and inspections were made at a cost of $609.41, all for maintenance.
The expenditures were $409.09.
    Condition at end of fiscal year.-The existing project is about 90
percent completed. The channel, 200 feet wide, and turning basin,
1,000 feet square, were completed in 1912. To complete the project,
the turning basin must be enlarged to project dimensions. This work
has not been done since there is no demand for a turning basin hav-
ing project dimensions. Constant shoaling occurs and project dimen-
sions have not been maintained as lesser dimensions are sufficient to
accommodate existing commerce.
    The controlling depths at mean low tide were 22 feet in the channel
and 91/2 feet over the area being maintained in the turning basin
at the entrance to slip no. 3.
    The total cost of the existing project to June 30, 1937, was $562,-
301.75, of which $85,213.85 was for new work and $477,087.90 for
maintenance. The total expenditures were $562,101.43.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $40,154.05, including an allotment of
$25,003, made during July 1937, will be applied as follows:
Accounts payable June 30, 1937-_- _______     _________-_              _---_---     $474. 77
Maintenance :
      Dredging in the turning basin by contract (July 1937)------- 15, 000. 00
      Dredging in the turning basin by contract (June 1938)------- 24, 679. 28
       Total --------------------------           ---       --------              40, 154. 05
            RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                      795

  It is not proposed to maintain project dimensions for the reason
that lesser depth and width are sufficient for commerce at this port.
  The additional sum of $20,000 can be profitably expended during
the fiscal year 1939 to be applied to maintenance dredging in the
turning basin by contract during April and May 1939.
                                             Cost and financial summary
Cost of new work to June 30, 1937------------------------                                            $133, 924. 60
Cost of maintenance to June 30, 1937------------------------                                          523, 183. 65
     Total cost of permanent work to June 30, 1937-------------657, 113.25
Undistributed costs June 30, 1937-----------------------------      274.45

      Net total cost to June 30, 1937   -----------------------                                       657, 387. 70
Minus accounts payable June 30, 1937----------------------------                                          474. 77

     Net total expenditures_-------------------------------                                           656, 912. 93
Unexpended balance June 30, 1937--- ------------------------                                           15, 154. 05
         Total amount appropriated to June 30, 1937_-                                                       066. 98
                                                                                                      6------------72,

         Fiscal year ending June 30                   1933      1934          1935            1936           1937


Cost of new work          --------------------
Cost of maintenance------------------- $22,863.42             $7, 564. 51   $9, 794. 27   $11, 787. 37        $609. 41

Total expended----.....----......---------------22, 922. 26    7, 649. 19    9, 800. 30    11. 787. 37         409.09
Allotted--------.......---------------------39, 822. 70         -85. 72      9, 500. 00    20, 000. 00     -9, 000. 00


Balance unexpended July 1, 1936---------------------------                                           $24, 563. 14
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936_-.... ______-   -_________ __                                                       4,000. 00
     Amount to be accounted for---------------------------                                               28, 563. 14
Deductions on account of revocation of allotment --------------                                          13, 000. 00
      Net amount to be accounted for-----------------------15,                                              55. 14
Gross amount expended--------------------------- ----------                                                 409. 09
      Balance unexpended June 30, 1937----------------------15,                                             154. 05
Outstanding liabilities June 30, 1937----------------- $474. 77
Amount covered by uncompleted contracts----------- 10,004. 71
                                                                                                         10,479. 48
     Balance available June 30, 1937------------------------                                              4, 674. 57
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------25,                                               000. 00
      Balance available for fiscal year 1938-------------------                                 29, 674. 57
Amount (estimated) required to be appropriated for completion
                         - - - - - - -- ----- -     --- - - - - - -- - - - - - - - - - - - - -
of existing project                                                                           102, 000. 00
Amount that can be profitably expended in fiscal year ending
                                         --- - - - - - - - - - - - - - - - ---- --- --
June 30, 1939, for maintenance                                                                 20, 000. 00
1 Exclusive of available funds.

                              7. HOUSTON SHIP CHANNEL, TEX.

  Location.-The channel connects Galveston Harbor, at a point
opposite Port Bolivar, with the city of Houston, Tex., extending 50
miles in a northwesterly direction across Galveston Bay through the
San Jacinto River and Buffalo Bayou to a turning basin at the
head of Long Reach with a light-draft channel 7 miles long from
796     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the turning basin to Main Street, Houston. (See U. S. Coast and
Geodetic Survey Charts Nos. 1282 and 532.)
   Previous projects.-Authorized by River and Harbor act of June
10, 1872; modified in 1877; and by River and Harbor acts of March
3, 1879; March 3, 1899; February 20, 1900; March 3, 1905; and
March 4, 1913. The cost and expenditures were (including the pur-
chase of the Morgan cut and canal), $5,318,299.27, of which $4,105,-
156 87.was for new work and $1,213,142.40 was for maintenance, in-
cluding $9,560 for operation and care under the permanent indefinite
appropriation. In addition to these amounts $1,409,178.78 was ex-
pended from contributed funds, $1,209,178.78 being for new work
and $200,000 for maintenance.       (For further details see p. 1856 of
the Annual Report for 1915.)
   Existing project.-This provides for a channel 34 feet deep at mean
low tide from deep water in Galveston Bay to and including the
Houston turning basin, with a width of 400 feet through Galveston
Bay, 300 feet in the cut through Morgan Point, 300 feet thence to a
point 5 000 feet above Baytown, thence 250 feet to Norsworthy, and
200 feet thence to the turning basin (about 1,000 feet wide) with
suitable widening of the bends at Lynchburg, Norsworthy, Man-
chester, and Harrisburg. The project also provides for suitable
widening of the channel in front of the wharf at Manchester, for
certain cut-offs and easing of sharp bends, for the construction of a
dike 26,000 feet long to protect the channel in upper Galveston Bay,
and for a light-draft extension of the channel, 10 feet deep at mean
low water and 60 feet wide, without easing the bends, through Buffalo
Bayou from the turning basin to the mouth of White Oak Bayou in
Houston, Tex.
    The mean tidal range under ordinary conditions is about 1.3 feet
in the lower part of Galveston Bay, 0.6. foot in the upper bay, and
less than 0.5 foot in the San Jacinto River and Buffalo Bayou. The
extreme ranges under ordinary conditions are about 1.6 feet, 1.3 feet,
and 1 foot, respectively. Freshets sometimes cause rises of over 12
feet in Buffalo. Bayou. The height of the tides, however, is de-
pendent largely on the wind, and during strong northers in the
winter season the water surface may be depressed 2 feet below mean
low tide.
    The estimate of cost for new work, revised in 1935, is $13,025,000,
exclusive of amounts expended on previous projects, but inclusive
of . $1,365,000 contributed by local interests. The latest (1935)
approved estimate for annual cost of maintenance is $800,000.
    The existing project was adopted by the following river and
harbor acts: The act of March 3, 1905, provided for the easing or
cut-off of sharp bends and the construction of the pile dike (Rivers
and Harbors Committee Doc. No. 35, 61st Cong., 2d sess.) ; act of
March 2, 1919, provided for a 30-foot channel, the widening at Man-
chester, and the present project dimensions of the turning basin (H.
Doc. No. 1632, 65th Cong., 3d sess.) ; act of March 3, 1925, provided for
the light-draft extension of the channel to the'mouth of White Oak
Bayou (H. Doc. No. 93, 67th Cong., 1st sess.), act of July 3, 1930,
provided for the widening of the channel through Morgan Point
and to a point 4.000 feet above Baytown and for widening certain
bends (H. Doc. No. 13, 71st Cong., 1st sess.); the existing project
            RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                    797
main channel dimensions were authorized by the act of August 30,
1935 (Rivers and Harbors Committee Doc. No. 28, 72d Cong., 1st
sess., and Rivers and Harbors Committee Doc. No. 58, 74th Cong.,
1st sess.). The 32-foot depth (Rivers and Harbors Committee Doc.
No. 28, 72d Cong., 1st sess.) was authorized by the Public Works
Administration September 6, 1933, prior to its inclusion by the
River and Harbor Act of August 30, 1935. The latest published
map is in the last-mentioned document.
   Local cooperation.-The work authorized by the River and Har-
bor Act of August 30, 1935, is subject to the provisions that local
interests shall furnish, free of cost to the United States, necessary
rights-of-way for the widening of the channel and suitable areas for
the disposal of dredged material during the initial construction
and for future maintenance as and when needed, and release the
United States from all claims for damages to private or municipal
property due to the improvement and its maintenance.
   Cooperation required by the above act has been partly furnished
and it is reported that all conditions will be met promptly. All
cooperation required under prior acts has been fully complied with.
   Terminal facilities.-The city of Houston and the Harris County
Houston Ship Channel navigation district have constructed modern
terminals which supplement privately owned wharves. The exist-
ing facilities are considered adequate for existing commerce. (See
Port Series No. 6, pt. 2, Corps of Engineers.)
   Operations and results during fiscal year-New work.--Under a
contract providing for both new work and maintenance dredging,
the channel from near Red Fish Reef to and including the Morgan
Point cut was dredged to project dimensions during the period
September 14, 1936, to April 16, 1937, and 5,615,200 cubic yards of
material classed as new work were removed from a channel length
of 70,000 feet at a cost of $349,521.87. In addition, a payment of
$4,200 was made from Public Works funds for a claim for dredging
performed during fiscal year 1936. The total cost of new work for
the year was $353,721.87.
   Maintenance.-Under the contract above mentioned, 1,371,269
cubic yards of material classed as maintenance were removed at a
cost of $86,090.58.
   Dredging -was          .performed
                             by United States dredges, as follows:

       Plant                     Locality                          Date                  Cubic yards
                                                                                          removed         Cost


Pipe Line Dredge      Entrance to turning basin       July 1-Sept. 3, 1936; Mar. 29-        450,043    $134,030.94
  Raymond.             and bayou section.               June 30, 1937.
   Do _______---
         ..      __   Bay section.....-------------   Sept. 4, 1936-Mar. 5, 1937-...__    1,812, 574    137, 137. 67
Hopper Dredge         Lower end and entrance          Dec. 24,1936-Feb. 28,1937; June      1673, 799     51,951.12
  Galveston.           to channel at Bolivar            1-21, 1937.
                        Roads.

1 Bin measurement.

  In the maintenance dredging performed during the year by United
States plant the entrance to the turning basin and a channel length
of approximately 38,500 feet were redredged, a total of 2,936,416
cubic yards of material being removed at a cost of 323,119.73.
 798            REPORT OF CHIEF OF ENGINEERS, U.L S. ARMY, 1937

   The U. S. derrick boat No. 8 removed snags and logs from the
channel and light draft extension from July 1 to September 6, 1936,
and removed wreckage from the channel during the period February
23 to 28, 1937, all at a cost of $9,275.09.
   There were additional costs amounting to $35,526.76 for mis-
cellaneous surveys and inspections, building levees, preparing dump-
ing grounds, etc. The total cost of all maintenance work was $454,-
012.16.
   The total cost of all work for the year was as follows:

                                                                                               New work         Maintenance              Total

Regular funds_._           ..-.--....            --...----------...             --.   --....   $349, 521.87       $454, 012. 16         $803, 534. 03
Public Works funds_...-                 --.---..-....                 -------.......-.            4, 200. 00-----.---...           --      4, 200. 00
       Total    _-.-.-.-.__-.....       -....     ---.          -   --.......                  353, 721. 87        454,012. 16           807,734.03



   The total expenditures were $829,382.37, of which $825,182.37 was
from regular funds and $4,200 from Public Works funds.
   Condition at end of fiscal year.-The ex;sting project is about 79
percent completed. The channel from Bolivar Roads to Morgan
Point has been dredged to project dimensions, the remainder of the
channel has been dredged to a depth of 32 feet and widths varying
from 150 to 250 feet, and the turning basin has been dredged to a
depth of 32 feet, and to project width, with the exception of a small
area in the southwestern part of the basin.
   To complete the existing project the channel between Morgan
Point and the turning basin is to be deepened to 34 feet and widened
to project width; the turning basin deepened to 34 feet and the in-
completed part dredged; the light draft extension of the channel
above the turning basin dredged, and a dike 26,000 feet long to pro-
tect the channel in upper Galveston Bay completed.
   A side or tributary channel 10 to 12 feet deep and 3,700 feet long
has been excavated from the ship channel to the mouth of Goose
Creek.
   The controlling depths at mean low tide along the center line
of the channel were as follows: Through Galveston Bay 331/2 feet,
thence to mouth of Vinces Bayou 321/2 feet, thence to turning basin
32 feet, in turning basin 33 feet, thence to Houston 7 feet. The con-
trolling, depth in the channel to the mouth of Goose Creek was about
6 feet.
   The total cost of the existing project to June 30, 1937, was as
follows :

                                                                                      New work           Maintenance                    Total

Regular funds ------------- --------------------------                                $5, 541, 659. 68    $6,957,919. 52          $12, 499, 579. 20
Public Works funds.-......        .-----------------------.                            2, 612, 931.98     .-------------            2,6612, 931.98

      Total .....-.-     ..------.-             ----....-----                          8, 154, 591..66        6, 957, 919. 52      15, 112, 511. 18



  The total expenditures were $15,109,483.59 of which $12,496,551.61
was from regular funds and $2,612,931.98 from Public Works funds.
In addition $1,365,000 was expended from contributed funds.
          RIVERS AND HARBORS-GALVESTON,                   TEX., DISTRICT                 799
   Proposed operations.-The balance unexpended and accounts re-
ceivable at the end of the fiscal year, amounting to $1,824,443.11, in-
cluding an allotment of $1,800,000 made during July 1937 will be
applied as follows:
Accounts payable June 30, 1937___--------------------------------     $10, 962. 27
New work : Deepening the channel from 32 feet to 34 feet from the
  upper end of Morgan Point Cut to about Greens Bayou and
  widening the channel to 300 feet from Morgan Point to a point
  5,000 feet above Baytown and widening to 250 feet from a point
  5,000 feet above Baytown to about Greens Bayou, with suit-
  able easing of bends, by three contracts (September 1937 to
  June 1938) --------------------------                    -----    1,120, 000. 00
Maintenance :
     Removing of shoaling in the channel and turning
       basin with United States pipe-line dredge (July
       1937 to June 1938) -------------------------- $283, 000. 00
     Building levees and preparing dumping grounds
       for United States plant (July 1, 1937 to June
       30, 1938)------------------------------------    10, 000. 00
     Harrisburg, Tex., field office expenses (July 1937
       to June 1938)-------------------------           20, 480. 84

        Total for maintenance________ _______________- ---                        313, 480. 84
    Balance available -----------------------------------------                   380, 000. 00

            Total for all work____________________________             _     1, 824, 443. 11
  The additional sum of $2,390,000 can be profitably expended dur-
ing the fiscal year 1939, as follows:
New work: Complete the 34-foot dredging project by deepening
  the channel from 32 feet to 34 feet from about Greens Bayou to
  aid  including the turning basin, and widening the channel to
250 feet from about Greens Bayou to Norsworthy, and widen-
ing to 200 feet from Norsworthy to the turning basin with
  suitable easing of bends, by contracts (July 1938 to June
  1939)               ---------------------------------------- $1, 800, 000. 00
Maintenance :
    Removal of shoaling in the channel and turning
       basin by United States pipe-line dredges or by
       contract (July 1938 to June 1939)-_ _____-_ $512, 000
    Removal of shoals from bay section by United
       States seagoing hopper dredge (July and August
       1938) __" _____________-____________________       48, 000
    Building levees and preparing dumping grounds by
       United States plant (July 1938 to June 1939)___    10, 000
    Harrisburg, Tex., field office expenses (July 1938 to
        June   1939)--          --   ________                      20,000

        Total for maintenance__                                                   590, 000. 00
        Total for all work------------------------------------               2, 390, 000. 00
                             Cost and financial summary

                         MAINTENANCE AND IMPROVEMENT       FUNDS


Cost of new work to June 30, 1937---------------------------_               $9, 646, 816. 55
Cost of maintenance to June 30, 1937_______________________                  8,171, 061. 92

        Total cost of permanent work to June 30, 1937        -    --
                                                                 ---       117,   817, 878. 47
  1 In addition, $1,409,178.78 ($1,209,178.78 for new work and $200,000 for maintenance)
expended from contributed funds on previous projects and $1,365,000 was expended from
contributed funds for new work on existing project.
       20196-37pt. 1--51
800          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Undistributed costs June 30, 1937                             __                                                        $7, 930. 48

      Net total cost to June 30, 1937 __________                                                               17, 825, 808. 95
Plus accounts receivable June 30, 1937___     _____                                                                       4. 20

     Gross total costs to June 30, 1937__________  __                                                          17, 825, 813. 15
Minus accounts payable June 30, 1937________________                                                                    10, 962. 27

        Net total expenditures________________________                                                       117, 814,      850. 88
Unexpended          balance June 30, 1937________ __________                                                            24, 438. 91

        Total amount appropriated to June 30, 1937__                                                         1 17, 839, 289. 79

     Fiscal year ending June 30                        1933           1934                1935               1936            1937


Cost of new work- .. -          --.             $312, 723. 43      $13, 740. 97     -                                     $349, 521. 87
Cost of maintenance                                58, 658. 82     118, 466. 50         $464, 869. 52 $429, 529. 15        454, 012. 16
     Total cost _   -                            371, 382. 25      132, 207. 47          464, 869. 52    429, 529. 15      803, 534. 03
Total expended .....                             912, 783. 83      383, 265. 33   -1, 505, 881. 06       481, 962. 60      825, 182. 37
Allotted________________________              1,160,154. 47        224, 287.08    -1, 573, 374. 86       670, 000.00       350,000.00


Balance unexpended July 1, 1936__________________________                                                           $499, 621. 28
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936 _-                          --                                                                350, 000. 00
       Amount to be accounted for__                                                                                  849, 621. 28
Gross amount expended________________________                                           $825, 211. 22
Less reimbursements collected-    -- --                                                        28. 85
                                                                                                                    825, 182. 37
      Balance unexpended June 30, 1937-__                                                                               24, 438. 01
Outstanding liabilities June 30, 1937-.___                                                               _              11, 556. 66
      Balance available June 30, 1937 ....                                                                 _
                                                                                                        _._.12,             882. 25
Accounts receivable June 30, 1937_ -                                     _____                                                4. 20
     Unobligated balance available June 30, 1937 -- __   _                                                              12, 886. 45
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937 __________________-___                                                  ____             1, 800, 000. 00

        Balance available for fiscal year 1938------------------                                                  1, 812, 886. 45
Amount (estimated) required to be appropriated for completion
  of existing project      2----------------------------                                                          1, 930, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2------------------------------                                                                   1, 800, 000. 00
     For maintenance        2                                                                                        8--590,
                                                                                                                          000. 00

        Total 2__ __            _______--___________-                                                             2, 390, 000. (00
  1 In addition, $1,409,178.78 ($1,209,178.78 for new work and $200,000 for maintenance)
expended from contributed funds on previous projects and $1,365,000 was expended from
contributed funds for new work on existing project.
  2 Exclusive of available funds.


                                              PUBLIC           WORKS     FUNDS


Cost of new work to June 30, 1937__________________                                                            $2, 612,931. 98
Cost of maintenance to June 30, 1937________________
        Total cost of permanent work to June 30, 1937_                                                            2, 612, 931. 98
Net total expenditures___________________________                                                                 2, 612, 931. 98
Total amount appropriated to June 30, 1937______                                                                  2, 612, 931. 98
             RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                                        801

    Fiscal year ending June 30               1933              1934                  1935                   1936              1937

Cost of new work____________.......------------.......... $1,099, 022. 14 $1, 337, 818. 46  $171,891. 38       $4, 200, 00
Cost of maintenance.-------------------                            ------- -------------- -------------- --------------
              .-----------------------
Total expended----                                           902, 949. 90     1,499, 951. 94          205, 830. 14             4, 200.00
Allotted.--------------------------------1, 500, 000. 00                      1,093, 205. 91            19, 726. 07------------


Balance unexpended July 1, 1936- ---------------------------                                                              $4, 200. 00
Gross amount expended----- --------------------          -------------                                                      4, 200. 00

CONSOLIDATED          COST AND FINANCIAL                  SUMMARY FOR HOUSTON SHIP                                 CHANNEL, TEX.

Cost of new work to June 30, 1937--------------------------$12, 259, 748. 53
Cost of maintenance to June 30, 1937__---------- __--------   8, 171, 061.92

      Total cost of permanent work to June 30, 1937---------   120, 430, 810. 45
Undistributed costs June 30, 1937 ----------------------------        7, 930. 48
      Net total cost to June 30, 1937                                                                                   438, 740. 93
                                                                                                                    2-------------------------0,
Plus accounts receivable June 30, 1937---------------- -----                                                                      4. 20

      Gross total costs to June 30, 1937 _____-.                             _____________                          20, 438, 745. 13
Minus accounts payable June 30, 1937--------------------                                                                  10, 962. 27

     Net total expenditures                                                  -              --                     120, 427, 782..86
Unexpended balance June 30, 1937___                                ---------------                                        24, 438. 91

           Total amount appropriated to June 30, 1937 _                                          --    --          120, 452, 221. 77


    Fiscal year ending June 30               1933               1934                 1935                   1936              1937


Cost of new work_                        $312, 723. 43    $1, 112, 763. 11 $1, 337, 818. 46           $171, 891. 38         $353, 721. 87
Cost of maintenance                        58, 658. 82        118, 466. 50     464, 869. 52            429, 529. 15          454, 012. 16
       Total cost                          371, 382. 25    1, 231, 229. 61       1, 802, 687.98        601, 420. 53          807, 734. 03
Total expended_                    --      912, 783. 83    1, 286, 215. 23         -5, 929. 12         687, 792. 74          829, 382. 37
Allotted       -_                       1, 160, 154. 47    1, 724, 287. 08       -480, 168. 95         689, 726. 07          350. 000. 00


Balance unexpended July 1, 1936------- __________________-_                                                           $503, 821. 28
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936----------------------------  -----------                                                          350, 000. 00
      Amount to be accounted for-------------------------                                                               853, 821. 28
Gross amount expended ....                       $829,411.22
Less reimbursements collected-------------------       28. 85
                                                                                                                        829, 382. 37
      Balance unexpended June 30, 1937--------------------                                                               24, 438. 91
Outstanding liabilities June 30, 1937-------   ---------                                                    _            11, 556. 66
           Balance available June 30, 1937_-----------------------                                                       12, 882. 25
Accounts receivable June 30, 1937_------------------------                                                                       4. 20

     Unobligated balance available June 30, 1937                                                                         12, 886. 45
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937--------------------------------                                                          1, 800, 000. 00
   Balance available for fiscal year 1938_
                                         -----------------                                                           1, 812, 886. 45
Amount (estimated) required to be "appropriated for completion
   of existing         project 2_ __            ___            _             ______                                  1, 930, 000. 00

  1 In addition, $1,409.178.78 ($1,209,178.78 for new work and $200.000 for maintenance)
expended from contributed funds on previous projects and $1,365,000 was expended from
contributed funds for new work on existing project.
  2 Exclusive of available funds.
802            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
                              - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - -
   For new work 2                                                                                   $1, 800, 000. 00
   For maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -     590, 000. 00
         Total 2-_-   --- -- --- --- -- --- -- --- -- --- -- -- -- --- -- -- --- -- --
                                                                                                    2, 390, 000. 00
   2 Exclusive of available funds.

                                          8. DOUBLE BAYOU, TEX.
   Location.-This bayou enters upper Galveston Bay on the east side
about 30 miles north of Galveston and about 81/4 miles south of
Anahuac. (See U. S. Coast and Geodetic Survey Chart No. 1282.)
   Existing project.-This provides for a channel 6 feet deep at mean
low tide and 100 feet wide through the bar at the mouth of Double
Bayou. Under ordinary conditions the mean tidal range is about
0.7 foot, and the extreme range is about 0.9 foot. The height of
tides is dependent largely on the wind, and during strong "northers"
in the winter season the water surface may be depressed 11 feet
below mean low tide.
   The estimate of cost for new work, revised in 1928, is $12,500. The
latest (1928) approved estimate for annual cost of maintenance is
$10,000.
   The existing project was authorized by the River and Harbor Act
approved March 3, 1899 (H. Doc. No. 387, 55th Cong., 2d sess.). The
latest published map is contained in the project document.
   Terminal facilities.-The terminal facilities on this waterway are
confined to small wharves for local use. They are considered ade-
quate for the present commerce.
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.-The existing project is about 70
percent completed. A channel 60 to 85 feet wide has been dredged
to project depth. The channel must be widened to 100 feet to com-
plete the project, but at the present time commerce does not justify
such action. Controlling depths at mean low water were 41/2 feet
in the entrance channel and 41/2 feet in the bayou.
   The total cost to June 30, 1937, was $119,126.67, of which $6,953.20
was for new work and $112,173.47 for maintenance. The total ex-
penditures were $119,126.67.
   Proposed operations.-No funds available and no work is ex-
pected to be necessary during the fiscal years 1938 and 1939.
                                          Cost and financial summary
Cost of new work to June 30, 1937-----------                                                                953. 20
                                                                                                        $------------------
Cost of maintenance to June 30, 1937---------------------------                                        112, 173.47
      Total cost of permanent work to June 30, 1937-------------- 119,126. 67
Net total expenditures----------------------------        ---     119, 126. 67
Total amount appropriated to June 30, 1937                              126.67
                                                                  1--------------------19,

         Fiscal year ending June 30                 1933          1934           1935          1936           1937

Cost of new work ..-------------------------------
Cost of maintenance..---------------------------- - -           $6, 926. 49       $70. 63    $6, 312. 91
Total expended........----------------------      $4, 624. 28    6, 926. 49 -                 6, 383. 54
                --
Allotted ..............----------------    ---.    4, 355. 55      700. 00      7, 226. 49                  -.--..----
                                                                                                           -$1, 616. 46
           RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                            803
Balance unexpended July 1, 1936__                       -----------     --   $1, 616.46
Deductions on account of revocation of allotment---------                      1,616. 46
Amount (estimated) required to be appropriated for completion
  of    existing   project----------------_______                             5, 500.00

                                9. ANAHUAC              CHANNEL, TEX.

   Location.-The town of Anahuac is on the northeast side of up-
per Galveston or Trinity Bay, opposite the mouth of the Trinity
River, 38 miles north of Galveston and 25 miles northeast of Sea-
brook. (See U. S. Coast and Geodetic Survey Chart No. 1282.)
   Existing project.-There is no definite project for this channel.
The River and Harbor Act approved March 3, 1905, contained an
item for "Improving West Galveston Bay Channel, Double Bayou,
and mouths of adjacent streams, including Trinity River, Anahuac
Channel, and Cedar Bayou", but at the time of the appropriation
no recommendation of definite channel dimensions had been made to
Congress. A channel 6 feet deep at mean low tide and 80 feet wide
was dredged in 1905 from Galveston Bay to the wharves at Anahuac,
a distance of 16,000 feet. Under ordinary conditions the mean tidal
range is about 0.7 foot and the extreme range about 0.9 foot. The
height of tides is dependent largely on the wind, and during strong
"northers" in the winter season the water surface may be depressed
11/2 feet below mean low tide.
   The latest (1928) approved estimate for annual cost of mainte-
nance is $12,500. The latest published map is contained in House
Document No. 440, Fifty-sixth Congress, first session.
   Terminal facilities.-The terminal facilities are at Anahuac and
consist of several small wharves and slips for local use. They are
considered adequate for the existing commerce.
   Operations and results during fiscal year.-Logs and snags were
removed from the channel by the operation of U. S. derrick boat
No. 8 from October 13 to November 20, 1936, and by hired labor
throughout the year at a total cost of $5,843.21. Miscellaneous sur-
veys and inspections were made at a cost of $1,068.40.
   The total cost of all work during the fiscal year was $6,911.61, all
for maintenance. The total expenditures were $6,719.65.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1911. The controlling depth was 21/2 feet at mean low
tide. The total cost to June 30, 1937, was $232,751.54, of which
$5,975.10 was for new work and $226,776.44 for maintenance. The
total expenditures were $232,559.58.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $43,457.18, including an allotment of
$41,500, made during July 1937, will be applied as follows:
Accounts payable June 30, 1937----------------                                 $-----------------
                                                                                   96
Maintenance :
   Dredging the channel by contract (August 1937 to October
         1937)                                      -          --     ____   34, 650.00
       Remove logs and snags from the channel with Government
         plant and hired labor (July 1937 to June 1938)-------------          8, 615. 22
           Total-------------------------------------------------43, 457. 18
804         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The additional sum of $37,500 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance :
    Dredging the channel by contract (May 1939 to June 1939) ------ $30, 000
   Removing logs and snags from the channel with Government plant
      and hired labor (July 1938 to June 1939) ---------------------  7, 500

            Total ---------------             ------------------------------------                       37, 500

                                     Cost and financial summary
Cost of new work to June 30, 1937--------------------                                             $5, 975. 10
Cost of maintenance to June 30, 1937------------------                                           226, 776. 44

      Total cost of permanent work to June 30, 1937-----------                                   232, 751. 54
Minus accounts payable June 30, 1937--------------------------                                        191. 96
     Net total expenditures ..      -------------------------                                    232, 559. 58
Unexpended balance June 30, 1937_-------______-__---,_____---                                         1, 957. 18
        Total amount appropriated to June 30, 1937_______________ 234, 516. 76

        Fiscal year ending June 30            1933         1934           1935           1936             1937


Cost ofnew w ork - -......-_-                           i- - ----
                                                     -- ----               ---
                                                                        i---i               ----       -----------
Cost of maintenance...        ___           $1, 741. 34 $19, 276.14     $1,304.96     $17, 549.01        $6, 911.61
Total expended        _       __
                   -------------------- 4,023. 40        19, 288. 26     1,127. 46     17, 774. 25        6,719. 65
Allotted.....................
             ------------------------- 8,853. 57         12, 245. 70    20,000.00      38,000.00       -34,      00

Balance unexpended July 1, 1936--                                                                $42, 676. 83
Deductions on account of revocation of allotment_                                                 34, 000. 00
      Net amount to be accounted for_______                              -___------                   8, 676. 83
Gross amount expended                                                                                 6, 719. 65

      Balance unexpended June 30, 1937--                                                                , 957. 18
                                                                                                      1----------------------
Outstanding liabilities June 30, 1937--------------                           ----------              -191. 96

     Balance available June 30, 1937                                                                  1, 765. 22
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937___-----                           ------------                                41, 500. 00

        Balance available for fiscal year 1938_____________________                                  43, 265. 22

Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance _________                    __-------------                             37, 500. 00
  1 Exclusive of available funds.
                                     10. CEDAR BAYOU, TEX.

   Location.-This bayou is about 30 miles long.                              It flows to the south
and empties into the northwest corner of upper Galveston Bay, about
11/2 miles below the mouth of San Jacinto River and about 281/2 miles
north of Galveston, Tex. (See U. S. Coast and Geodetic Survey
Chart No. 1282.)
   Previous projects.-Adopted by the River and Harbor Acts of
September 19, 1890, and July 13, 1892. The cost and expenditures
were $108,871.28, of which $39,087.15 was for new work and $69,-
784.13 was for maintenance.
        RIVERS AND HARBORS-GALVESTON,          TEX., DISTRICT      805
   Existing project.-This provides for a channel 10 feet deep at
mean low tide and 100 feet wide from the Houston Ship Channel to
a point on the bayou, 11 miles above the mouth. The project also
includes the jetties at the mouth of the bayou provided for under the
previous project. Under ordinary conditions the mean tidal range
is about 0.6 foot and the extreme range 1.3 feet. The height of tides
is dependent largely on the wind, and during strong "northers" in the
winter season the water surface may be depressed 2 feet below mean
low tide.
   The estimate of cost for new work made in 1930, exclusive of
amounts expended on previous projects, is $50,000, of which $25,000
is to be contributed by local interests. The latest (1930) approved
estimate for annual cost of maintenance is $20,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (S. Doc. No. 107, 71st Cong., 2d sess.). The latest pub-
lished map is in this document.
   Local cooperation.-The River and Harbor Act approved July 3,
1930, provides that local interests shall contribute 50 percent of the
estimated first cost of the improvement, but not to exceed $25,000,
and shall furnish, without cost to the United States, all necessary
easements, rights-of-way, and dumping grounds.
   These conditions have not yet been completely met, but local inter-
ests have complied with all the necessary requirements to complete
the channel to the first bend in Cedar Bayou above the mouth.
   Terminal facilities.-The terminal facilities consist of a few small
wharves for local use located at various places along Cedar Bayou.
They are considered adequate for the existing commerce.
   Operations and results during fiscal year.-The section of the chan-
nel from the Houston Ship Channel to the first bend in the bayou
above the mouth was dredged under contract, between February 8
and May 4, 1937, 374,851 cubic yards of material being removed from
a channel length of 17,900 feet at a cost of $33,861.43. Miscellaneous
surveys and inspections were made at a cost of $2,345x50.
   The total cost of all work during the fiscal year was $36,206.93, all
for maintenance. The total expenditures were $36,243.65.
   Condition at end of fiscal year.-The existing project is about 50
percent completed. The channel has been completed to project di-
mensions from the Houston Ship Channel to the first bend in Cedar
Bayou above the mouth. Two brush and stone jetties have been con-
structed at the mouth of Cedar Bayou. To complete the project the
bayou must be dredged to project dimensions from the first bend
above the mouth to a point 11 miles above the mouth. The con-
trolling depths at mean low tide were 12 feet from the Houston Ship
Channel to the first bend in Cedar Bayou above the mouth and 8 feet
thence to a point in the bayou 11 miles above the mouth.
   The total cost of the existing project to June 30, 1937, was $118,-
569.52, of which $25,151.13 was for new work (consisting of $12,-
575.56 United States funds and $12,575.57 contributed funds) and
$93,418.39 for maintenance. The total expenditures were $118,569.52,
of which $105,993.95 was United States funds and $12,575.57 contrib-
uted funds.
   Proposed operations.-No funds are available.
806              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The additional sum of $40,000 can be profitably expended during
the fiscal year 1939, to be applied to maintenance dredging by con-
tract from September to November 1938.
                                       Cost and financial summary

Cost of new work to June 30, 1937____________________________                                            ' $51, 662. 71
Cost of maintenance to June 30, 1937-------__--------------------                                          163, 202. 52
           Total cost of permanent work to June 30, 1937__________                                        214, 865. 23
Net total expenditures_- ----  -__ -----          __     ---                                             '214, 865. 23
Total amount appropriated to June 30, 1937____________________                                             214, 865. 23

           Fiscal year ending June 30                   1933          1934          1935          1936           1937


Cost of new work--------------e---
Cost of maintenance    .----------------            $26, 437. 12       $97. 91   $30, 619. 37      $36. 72     $36, 206. 93

Total expended....        _
                         ..       _--------------------26, 437. 12      97. 91    30, 516.05       103.32       36, 243.65

Allotted------------              ------------       45, 723. 84     -451. 64     30, 000. 00   18, 000.00       -539. 07


Balance unexpended July 1, 1936______
                                   -       ____--___-_           $36, 782. 72
Deductions on account of revocation of allotment___________--------539. 07

       Net amount to be accounted for-------   --------                                                      36, 243. 65
Gross amount expended__--------------------------    --                                                      36,243. 65
Amount (estimated) required to be appropriated for completion    of
                   2 -- ----- -                          -
  existing project                  _______________            .                                             12, 500. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance -------------                                                                    40, 000. 00
    1 In addition, $12,575.57 was expended from contributed funds.
    2 In addition, $12,424 to be contributed by local interests.

                                        11. CLEAR CREEK, TEX.

  Location.-Clear Creek has its source about 13 miles south of
Houston, Tex., and flows southeast for a distance of about 25 miles,
emptying into the west side of upper Galveston Bay at a point 24
miles northwest of Galveston, Tex. (See U. S. Coast and Geodetic
Survey Chart No. 1282.)
  Existing project.-This provides for a channel 6 feet deep at mean
low tide and 60 feet wide from deep water in Galveston Bay to the
bridges 1 mile above the mouth of Clear Creek. Under ordinary
conditions the mean tidal range is about 0.6 foot and the extreme
range 1.3 feet. The height of tides is dependent largely on the
wind, and during strong "northers" in the winter season the water
surface may be depressed 2 feet below mean low tide. The original
estimate of cost for new work, made in 1900, was $10,000.
  The latest (1935) approved estimate for annual cost of mainte-
nance is $6,000.
  The existing project was authorized by the following river
and harbor acts: The act of June 13, 1902 (H. Doc. No. 449, 56th
Cong., 1st sess.), provided for a depth of 4 feet at mean low tide and
width of 50 feet, and the act of August 30, 1935 (I. Doc. No. 264,
73d Cong., 2d sess.), provided for an increase in depth to 6 feet at
mean low tide and width to 60 feet, with no increase in the estimated
            RIVERS AND HARBORS-GALVESTON,                                            TEX., DISTRICT                       807

costs. The latest published map is contained in the last-mentioned
document.
   Terminal facilities.-The terminal facilities consist of small
wharves for local use located at the town of Seabrook, at the mouth
of the creek, and at various points along the length of the waterway.
They are considered adequate for existing commerce.
   Operations and results during fiscal year.-Miscellaneous surveys
and inspections were made at a cost of $28.17, all for maintenance.
The expenditures for the year were $5,947.79.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1936. The controlling depth at mean low tide was 6 feet.
The total cost to June 30, 1937, was $83,444.67, of which $14,290.95
was for new work and $69,153.72 for maintenance. The total ex-
penditures were $83,444.67.
  Proposedoperations.-No funds are available. The sum of $10,000
can be profitably expended during the fiscal year 1939 to be applied
to maintenance dredging by contract about August 1938.
                                           Cost and financial summary

Cost of new work to June 30, 1937----------------------------                                                   $14,290.95
Cost of maintenance to June 30, 1937                                                                                 153. 72
                                                                                                                 6----------------------------9
        Total cost of permanent work to June 30, 1937                                     ------------              83, 444. 67
Net total expenditures_____________                                 ------------                                    83, 444. 67
Total amount appropriated to June 30, 1937-----------------------83,                                                   444. 67

        Fiscal year ending June 30                        1933         1934              1935           1936            1937


Cost of new work.-------                   ------------          -----------------------------------------
Cost of maintenance-------------------------- ---                   $4, 002. 47          $109. 89     $6, 642. 17         $28. 17

Total expended     ---------------------          ------------       4, 002. 47 -----------.             832. 44        5, 947. 79

Allotted_     ----------------------------- -$186. 92                 7, 000. 00         1, 002. 47    7, 500. 00     -4, 719. 77


Balance unexpended July 1, 1936-------------------------------                                                  $10, 667. 56
Deductions on account of revocation of allotment   _____--------                                                  4, 719. 77

      Net amount to be accounted for                                        ----------                              5, 947. 79
Gross amount expended   _ _ _------------                                                                           5, 947. 79
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------------------------------------                                                      0, 000. 00

                                      12. FREEPORT HARBOR, TEX.

  Location.--This harbor is formed by the improvement of the
Brazos River, Tex., from the mouth to Freeport, about 6 miles above.
(See U. S. Coast and Geodetic Survey Chart No. 525.)
  The mouth of the Brazos River is about 47 miles southwest of
Galveston Harbor entrance and about 137 miles northeast of Aransas
Pass (Port Aransas).
  Previous projects.-Authorized by River and Harbor Act of June
14, 1880. The total cost and expenditures were $147,098.43, for new
work. For further details see page 1860 of Annual Report for 1915.
808     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for a channel 32 feet deep from
deep water in the Gulf of Mexico to a point about one-half mile
below the Stauffer chemical plant with two turning basins, one 700
by 700 feet at Brazosport and one 600 by 600 feet at the upper end
of the channel, the channel to have a width of 300 feet seaward of
the jettied entrance, 200 feet from jettied entrance to the Brazos-
port turning basin, widened at the bend, and averaging 375 feet,
thence to the upper turning basin; the widths in the approaches to
the turning basins to converge within a distance of 800 feet from the
width of the turning basin to the width of the channel; and provides
also for the extension of the channel with a depth of 30 feet and a
width of 200 feet to and including the turning basin near the Stauf-
fer chemical plant at Freeport at a cost of $18,000 when required in
the interests of commerce and navigation. The work to be accom-
plished as may be found desirable, by dredging, by jetties at the
mouth of the harbor, and by a diversion dam in the Brazos River, a
diversion channel, and necessary auxiliary works in general accord-
ance with plan no. 6, as proposed by the district engineer, together
with a lock in the diversion dam, approximately 200 feet long, 55 feet
wide, and 121/2 feet deep over the miter sills. The River and Harbor
Act of July 3, 1930, modified the act of March 3, 1925, so as to pro-
vide that when local interests shall have furnished assurances satis-
factory to the Secretary of War that they will maintain the diversion
channel, the United States shall assume the cost of maintenance of
the navigable channel, estimated at $75,000 annually, including care
and operation of the lock, if provided (Rivers and Harbors Commit-
tee Doc. No. 18, 70th Cong., 1st sess.).
   Under ordinary conditions the mean tidal range is about 1.8 feet
and the extreme range about 21/2 feet. Freshets in the river, except
under extreme conditions, do not cause a greater variation in the
water surface than the tidal action.
   The estimated cost of new work, revised in 1935, is $2,504,000,
including $1,334,500 to be provided by local interests.
   The latest (1935) approved estimate of cost of annual maintenance
is $115,000 for 2 years after completion of the project and $100,000
thereafter.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for "dredging and
such other work as may be deemed most effective in the judgment
of the Secretary of War in improving and developing the harbor",
and also provided for taking over the jetties and other auxiliary
works built at the mouth of the river by a private company; as a
result of an examination authorized by the act of March 2, 1907,
the work was confined to maintenance of the jetties (H. Doc. No.
1087, 60th Cong., 3d sess.) ; by the act of February 27, 1911, dredging
was again authorized in addition to repairs to the jetties. The act
of March 4, 1913, provided for the construction of the seagoing hop-
per dredge, one-half the cost to be charged to this improvement and
one-half to Aransas Pass. The act of August 8, 1917, modified the
project by providing for the purchase of one 15-inch pipe-line dredge
and equipment, its operation for an experimental period of 3 years,
the operation of the seagoing dredge one-half time for 3 years,
        RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT             809
and repairs to the jetties (H. Doc. No. 1469, 63d Cong., 3d sess.).
The act of March 3, 1925, provided for the diversion dam, the diver-
sion channel and necessary auxiliary works (Rivers and Harbors
Committee Doc. No. 10, 68th Cong., 2d sess.), and the act of July 3,
1930, further modified the project to provide for maintaining the
diversion channel at the expense of local interests (Rivers and Har-
bors Committee Doc. No. 18, 70th Cong., 1st sess.). The Public
Works Administration September 6, 1933, and the act of August 30,
1935, provided for dredging the channels and turning basins to
greater depths (Rivers and Harbors Committee Doc. No. 15, 72d
Cong., 1st sess.) and further provided for the maintenance at Federal
expense of the increased channel dimensions to be provided at the
expense of local interests (Rivers and Harbors Committee Doc. No.
29, 73d Cong., 2d sess.).
    The latest published map is printed in Rivers and Harbors Com-
mittee Document No. 29, Seventy-third Congress, second session.
    Local cooperation.-All required local cooperation has been fully
complied with, except the 50-percent contribution toward the cost
of the extension of the channel to Freeport, which has not been
requested.
    Terminal facilities.-The terminal facilities are located at the
town of Freeport at the upper end of this improvement and at a
point about a mile above the inner ends of the jetties. The facilities
at Freeport consist of a small wharf, privately owned, and one
free public wharf owned by the municipality of Freeport. The
facilities just inside the mouth of the river consist of one sulphur-
loading dock, about 250 feet long, one oil dock, and one steamship
wharf in poor condition, about 450 feet long, with wooden shed. The
existing facilities are considered adequate for the commerce that
exists.
   Operations and results during fiscal year-Maintenance.-Repair
of the southwest jetty by placing a concrete cap thereon was con-
tinued under contract from July 1 to November 21, 1936. The work
performed consisted of placing 4,438.92 cubic yards of concrete
cap, at a total cost of $66,717.81, completing 3,400 linear feet of
jetty cap. Miscellaneous surveys and inspections were made at a
cost of $11,983.84.
   The total cost during the year was $78,701.65, all for maintenance.
The total expenditures were $101,524.77.
   Condition at end of fiscal year.-The existing project is about 85
percent completed. The work remaining to be completed consists of
dredging the extension of the channel to and including a turning
basin near the Stauffer chemical plant at Freeport and constructing a
lock in the diversion dam in the Brazos River.
   The controlling depths at mean low tide in the various channels
and turning basins were as follows:
   From deep water in the Gulf of Mexico to the jettied entrance,
26.0 feet, thence to the Brazosport turning basin, 25.9 feet; in the
Brazosport turning basin, 31.0 feet; in the channel above the Brazos-
port turning basin to and including the upper turning basin, 31.0
feet; and in the remainder of the channel, including the turning
basin at the Stauffer chemical plant, 19.3 feet.
810            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The total cost of the existing project to June 30, 1937, was as
follows :
                                                                                      New work            Maintenance               Total

Regular funds_    -------------------------------------                            $1, 101, 061. 89       $1,819, 751. 58        $2,920, 813.47
Public Works funds_ -                                                                   116, 574. 74      --------------            116, 574. 74
        Total United States funds                    -                                1, 217, 636. 63      1,819, 751. 58         3, 037, 388. 21
Contributed funds--
                 .--------....-                                                         533, 302. 79       _                        533, 302. 79
Contributed funds (sec. 4, River and Harbor Act of Mar. 4,
1915)     ---------------------------------------------                                225, 000. 00 ---             ------         225, 000. 00
        Total all funds     ---------------------------------                         1, 975, 939. 42      1, 819, 751. 58        3, 795, 691. 00



  The total expenditures were $3,036,426.77, of which $2,919,852.03 was
from regular funds and $116,574.74 from Public Works funds. In
addition $758,302.79 was expended from contributed funds.
  Proposed operatio'ns.-The funds unexpended and accounts receiv-
able at the end of the fiscal year amounting to $106,891.39, including
an allotment of $99,000 made during July 1937, will be applied as
follows:
Accounts payable June 30, 1937_      __-__-__
                                ------              _--
                                                  __-------   ----                                                                  $961. 44
Maintenance:
    Dredging sea bar channel with United States seagoing hopper
     dredge (August and December 1937 and June 1938)----------                                                                   72, 000. 00
   Freeport, Tex., field office expenses (July 1937 to June 1938)____                                                            33, 929. 95

          Total--------------                                                                                                   106, 891. 39
  The additional sum of $100,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance:
   Dredging sea bar channel with United States seagoing hopper dredge
           (January and February 1939) _____                                               ---                                  __ $48, 000
        Dredging inside channels and turning basins, by contract (December
          1938 to February 1939) ---------------------------            __ 37, 000
        Freeport, Tex., field office expenses (July 1938 to June 1939)     15, 000                                 -------
          Total-------------------                          ---------------------------------- 100, 000
                         Cost and financial summary
Cost of new work to June 30, 1937______----------------------                                                       12   $1, 364, 735. 06
Cost of maintenance to June 30, 1937_____                                                                                    819, 751. 58
                                                                                                                          1-------------------1,

      Total cost of permanent work to June 30, 1937                                        -----------                    3, 184, 486. 64
Minus accounts payable June 30, 1937---------- ------                                                          _                  961. 44

     Net total expenditures----------------------   -----------                                                       12 3, 183, 525. 20
                                ----------------------------
Unexpended balance June 30, 1937__                                                                                            7, 891. 39
          Total amount appropriated to June 30, 1937------------12                                                            3,191, 416. 59

           Fiscal year ending June 30                           1933           1934                1935              1936              1937


Cost of new work -------------------------                                  $35, 696. 94     $57, 696. 17       $23, 181. 63               ...--
Cost of maintenance------------------                      $46, 201. 84     148, 753. 34         33, 895. 37       58, 506. 01      $78,701.65

        Total cost----------------------                    46, 201.   84   184, 450. 28         91, 591. 54       81, 687. 64       78, 701. 65

Total expended....---------------------                     48, 146. 15     182, 484. 16         85, 607. 98       66, 332. 16      101, 524. 77
Allotted ______----------------              -     .190,         274. 67    198,956. 10          30, 500.00        80, 500.00      -24, 425. 26

   I   Includes, $116,574.74 from Public Works funds.
   2 In addition $758,302.79 was expended from contributed funds.
          RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                      811

Balance unexpended July 1, 1936 ----------------     ------------ $133, 841. 42
Deductions on account of revocation of allotment------------------  24, 425. 26

      Net amount to be accounted for--------------------------  109, 416.16
Gross amount expended-----------------------------------------101, 524. 77
      Balance unexpended June 30, 1937-------------------------        7,891. 39
Outstanding liabilities June 30, 1937----------------------------      1,139. 94

     Balance available June 30, 1937----------------------------        6,751.45
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937---------------------------------------           99, 000. 00

     Balance available for fiscal year 1938-------------------- ---   105, 751.45
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ------- ---------     ----------------     100, 000.00
  a Exclusive   of available funds.

  13. CHANNEL FROM ARANSAS PASS (PORT ARANSAS) TO CORPUS.
                       CHRISTI, TEX.

    Location.-This channel extends from Port Aransas through the
depression known as Turtle Cove and through Corpus Christi Bay
to Corpus Christi Harbor, on the west side of the bay, a distance of
203/4 miles west of Port Aransas. (See U. S. Coast and Geodetic
Survey Charts Nos. 1285 and 1286.)
    Previous projects.-Adopted by River and Harbor Acts approved
March 2, 1907, and June 25, 1910. The cost and expenditures were
$342,907, of which $280,455.14 was for new work and $62,451.86 for

     xEsting
maintenance.
              project.-This provides for a channel 32 feet deep at
mean low tide and 200 feet bottom width, with widened passing
places, from deep water at Port Aransas through Turtle Cove and
Corpus Christi Bay to and including a turning basin at Corpus
Christi (1,000 feet wide by 3,000 feet long); for an industrial canal
30 feet deep and 150 feet wide, including a turning basin at Avery
Point about 800 feet wide by 1,200 feet long. All channels and basins
to be maintained at Federal expense except on strips lying 50 feet
channelward of pierhead lines or within 50 feet of the face of any
wharf or structure.
    Under ordinary conditions the mean tidal range is about 1 foot and
the extreme range about 1/2 feet. The heights of tides are dependent
largely on the winds, and during strong "northers" in the winter
season the water surface may be depressed 2 feet below mean low tide.
    The estimate of cost for new work, revised in 1935, is $2,511,800,,
exclusive of amount expended on previous projects. The latest
  (1935) approved estimate for cost of annual maintenance is $304,000
for the first year, $284,000 for each of the next 3 years, and $274,000
annually thereafter.
    The existing project was adopted by the following river and harbor
acts: The act of September 22, 1922, provided for a channel 25 feet
deep (H. Doc. No. 321, 67th Cong., 2d sess.); the act of July 3,
1930, provided for the 30-foot depth (Rivers and Harbors Com-
mittee Doc. No. 9, 71st Cong., 1st sess.) ; the act of August 30, 1985, pro-
vided for the channel and maneuvering basin between the break-
water and the western shore line of Corpus Christi Ray (H. Doc.
812      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

No. 130, 72d Cong., 1st sess.); provided for the maintenance to a.
depth of 30 feet except on strips lying 50 feet channelward of the
established pierhead lines or within 50 feet of the face of any wharf
or structure, of the approach channel, turning basin at Corpus Christi;
the industrial canal and the turning basin at Avery Point (Rivers
and Harbors Committee Doc. No. 13, 74th Cong., 1st sess.); and
provided for the maintenance and the deepening to 32 feet of the
channel from deep water at Port Aransas to and including the turn-
ing basin at Corpus Christi (Rivers and Harbors Committee Doc.
No. 63, 74th Cong., 1st sess.). The latest published maps are in
Rivers and Harbors Committee Documents Nos. 13 and 63, Seventy-
fourth Congress, first session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Terminals have been constructed at Corpus
Christi, Avery Point, Aransas Pass, Harbor Island, and Ingleside.
The present facilities are considered adequate for the existing coim-
merce. (See Port Series No. 6, pt. 3, revised 1932, Corps of Engi-
neers.)
   Operations and results during fiscal year.-New work. -A con-
tract providing for both new work and maintenance dredging was
completed from September 2, 1936, to February 10, 1937, 2,040,285
cubic yards of material classed as new work being removed from a
channel length of 54,315 feet at a cost of $176,802.27.
   Maintenance.-Underthe contract above mentioned 1,115,888 cubic
yards of material classed as maintenance were removed from a chan-
nel length of 63,830 feet at a cost of $95,943.50. Miscellaneous sur-
veys and inspections were made at a cost of $12,952.30. The total
cost of all maintenance work during the year was $108,895.80.
   The total cost of all work for the year was $285,698.07, of which
$176,802.27 was for new work and $108,895.80 for maintenance. The
total expenditures were $286,059.93.
   Condition at end of fiscal year.-The existing project was com-
pleted February 10, 1937. Controlling depths in the channels and
turning basins at mean low tide over project widths were as follows:
                                                                          Feet
Sec. no. 1 (vicinity of Port Aransas)   ---------                         33. 5
Sec. no. 2 (vicinity of Ingleside) ------------------------------- ------ 32. 5
Sec. no. 3 (bay section)-------------------------------                   29. 5
Sec. no. 4 (vicinity of Corpus Christi)                                   29.0
Approach channel and maneuvering basin-----------------------------33.0
Turing basin at Corpus Christi---------------------------------------33.      O
Industrial Channel-------------------------------------------------- 29. 5
Turning basin at Avery Point------------------------------                29. 5
   The total cost of the existing project to June 30, 1937, was $4,161,-
000.95, of which $2,300,248.86 was for new work and $1,860,752.09 for
maintenance. The total expenditures were $4,158,169.17. In addi-
tion $16,903.75 was expended from contributed funds for main-
tenance.
   Proposed operations.-The funds unexpended and accounts receiv-
able at the end of the fiscal year, amounting to $31,442.09, including
            RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                                 813
an allotment of $25,000 made during July 1937, will be applied as
follows:
Accounts payable June 30, 1937---------------------------------     $3, 246. 35
Maintenance: Corpus Christi, Tex., field office expenses (July 1937
  to June 1938)-----------------------------------------------      28,195. 74

        Total------------------------------------                                                                 31, 442. 09
  The additional sum of $284,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance :
    Dredge all channels and turning basins from Aransas Pass to
      Corpus Christi, Tex., by contract (January to May 1939)- __. $260, 000
    Corpus Christi, Tex., field office expenses (July 1938 to June
      1939) ------------------------------------------------------   24, 000

      Total                               ---------------------                                                     284, 000
                       Cost and financial summary
Cost of new work to June 30, 1937-------- -----                                                           $2, 580, 704.00
Cost of maintenance to June 30, 1937 -                            ------                                  11, 923, 203.95

      Total cost of permanent work to June 30, 1937                          -----------                   4, 503, 907. 95
Plus accounts receivable June 30, 1937--------------------------                                                   414. 57
      Gross total costs to June 30, 1937---------- ---------                                               4, 504, 322. 52
Minus accounts payable June 30, 1937-----------------                                                           3, 246. 35

     Net total expenditures---------------------------------14, 501, 076. 17
Unexpended balance June 30, 1937                                   , 027. 52
                                                                  6----------------------
        Total amount appropriated to June 30, 1937                         --------------                  4, 507, 103. 69

   Fiscal year ending June 30             1933                1934           1935                  1936               1937


Cost of new work_______________ ________$176,                                                                             802. 27
Cost of maintenance -_         _   $42, 056. 81            $257,168. 80    $83, 478. 70         $238, 612. 32        108, 895. 80
      Total cost_--          ---        42, 056. 81         257, 168. 80    83, 478. 70          238, 612. 32        285, 698. 07
Total expended .-
               _    _.............   -238, 719.82           252, 992. 73    25, 681. 06          236, 449. 21        286, 059. 93
Allotted_                      __     -40,
                                       --. 769. 11          189, 787. 53   113, 284. 65          170, 000. 00        120, 523. 69


Balance unexpended July 1, 1936_..                                   -          -----                           $171, 563. 76
Amount allotted from War Department Appropriation Act ap-
   proved May 15, 1936                   _--        ----                                                         177, 000. 00

     Amount to be accounted for ___-                                                    -----                    348, 563. 76
Deductions on account of revocation of allotment__                                                                56, 476. 31
      Net amount to be accounted for___                                                                          292, 087. 45
Gross amount expended_________________________ $296, 518.54
Less reimbursements collected-_________________  10, 458. 61
                                                                                                                 286, 059. 93

      Balance unexpended June 30, 1937 _____________________                                                       6, 027. 52
Outstanding liabilities June 30, 1937_____ _____________________                                                   3, 486. 42
        Balance available June 30, 1937________________________              2, 541.10
  1 In addition, $16,903.75 was expended from contributed funds for maintenance.
814       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Accounts receivable June 30, 1937____-- ___--   __________-----      $414.57

     Unobligated balance available June 30, 1937--------------      2, 955. 67
Amount allotted from War Department Civil Appropriation ap-
proved July 19, 1937------------------------------------         25, 000. 00

    Balance available for fiscal year 1938---__----- ------        27, 955. 67
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance 2_ ____________------------      284, 000. 00
  2Exclusive of available funds.

      14. CHANNEL FROM PASS CAVALLO TO PORT LAVACA, TEX.

   Location.-The bar at Pass Cavallo is 125 miles southwest of
Galveston entrance and 54 miles north of Aransas Pass. Port La-
vaca lies 26 miles to the northward of the pass, across Matagorda
and Lavaca Bays. (See U. S. Coast and Geodetic Survey Chart No.
1117.)
   Existing project.-This provides for a depth of 9 feet and a width
of 100 feet, following the existing channel from Lynns Bayou at
Port Lavaca, Tex., to deep water in Matagorda Bay near Port O'Con-
nor, Tex., a distance of about 9 miles. Under ordinary conditions
the mean tidal range is about 1 foot and the extreme range about 2
feet. The height of tide is dependent largely on the wind, and dur-
ing strong "northers" in the winter season the water surface may be
depressed 2 feet below mean low tide.
   The estimate of cost for new work, revised in 1937, is $138,874.
The latest (1937) approved estimate of cost for annual maintenance
is $15,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for a depth of 7
feet to Port Lavaca (H. Doc. No. 1082, 60th Cong., 2d sess.); act of
August 30, 1935, provided for extension of the 7-foot channel to
Lynns Bayou (Rivers and Harbors Committee Doc. No. 28, 74th
Cong., 1st sess.), and act of August 26, 1937, provided for the pres-
ent project dimensions (Rivers and Harbors Committee Doe. No. 37,
75th Cong., 1st sess.). The latest published map is ii the last-men-
tioned document.
   Local cooperation.-The River and Harbor Act of August 26,
1937, in adopting the modified project, provided that local interests
furnish, without cost to the United States, suitable spoil-disposal
areas for the proposed work and for future maintenance. None of
this cooperation has been met.
   Terminal facilities.-The terminal facilities located at Port Lavaca;
consist of two wooden piers 30 feet wide and 500 feet long, with a
slip between about 200 feet wide. Local interests have constructed
in Lynns Bayou a turning basin, packing plant (refrigerated) with
wharf, and two small boat wharves. The terminals are municipally
owned, and sufficient for the demands of the port commerce.
   Operations and results during fiscal year--New work.-A contract
for dredging the channel from deep water in Lavaca Bay to the
shore line at the mouth of Lynns Bayou was completed from August
3 to 19, 1936, 59,687 cubic yards of material classed as new work
being removed from a channel length of 4,500 feet at a total cost of
$11,465.91.
                  RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                                          815
  Maintenance.-Miscellaneous surveys and inspections were made
at a cost of $45.72. The total cost for the year was $11,511.63, of
which $11,465.91 was for new work and $45.72 for maintenance.
The total expenditures were $11,511.63.
  Condition at end of fiscal year.-The original project, providing
for a channel from deep water in lower Matagorda Bay to Port
Lavaca, a distance of 8 miles, was completed in 1910. The work of
dredging the extension of the channel from the existing channel in
Lavaca Bay to the shore line at the entrance to Lynns Bayou, a
distance of about 1 mile, was completed in 1936. The existing
project is 16 percent completed.
  The work remaining to be done to complete the project is the
enlargement of the channel from Lynns Bayou for a distance of 8
miles, and dredging a channel from this point to deep water in
Matagorda Bay near Port O'Connor, Tex.
   On June 30, 1937, the ruling depth below mean low tide was 6
feet in the Gallinipper Reef and Sand Point Channels, over a bottom
width of 75 feet. Elsewhere the channel had a ruling depth of 7
feet.
   The total costs and expenditures to June 30, 1937, have been
$31,029.99, of which $21,183.75 was for new work and $9,846.24 for
maintenance.
  Proposed operations.-No funds are available.
   The additional sum of $131,874 can be profitably expended during
the fiscal year'1939, as follows:
New work: Dredging channel from deep water in Matagorda Bay
  to the shore line at mouth of Lynns Bayou by contract (July to
January 1938) -----------------------------------------         $116, 874
Maintenance: Redredge channel as needed by contract (February
and March 1939) ---------------------------------------           15, 000

             Total for all work ------------------------                                                                           131, 874

                                                    Cost and financial summary
Cost of new work to June 30, 1937_-- --------------------------                                                                 $21, 183. 75
Cost of maintenance to June 30, 1937--------------------------                                                                    9, 846. 24
      Total cost of permanent work to June 30, 1937______     ___ _ 31, 029. 99
Net total expenditures-------------------- ---------------------- 31, 029. 99
Total amount appropriated to June 30, 1937_---------------------    31, 029. 99

     Fiscal year ending June 30                        1933                 1934             1935                 1936               1937


Cost of new work------------------..........................------------
                                                          ........................                                  $18. 36         $11, 465. 91
Cost of maintenance.-- --    -              $52. 47                --------------..-----------                        .-----.             45.72
         Total cost.....------------                      52. 47     --------------------------                      18. 36          11, 511. 63
Total expended..------------------...............         52. 47      .....        ...    -------------
                                                                                         ..---------------           18. 36          11, 511. 63

Allotted._-----------------------                     10,000.00    ------------          -$10,000.00             24, 000. 00       -12, 470.01


Balance unexpended July 1, 1936---------------- ---------------                                                                 $23, 981. 64
Deductions on account of:
    Refund of funds advanced----------------------$12, 000. 00
    Revocation of allotment--______ __________--..       470. 01
                                                                                                                                 12, 470. 01

             Net amount to be accounted for-------------                                                     -       _           11, 511.63
             201960-37-pt. 1--52
816      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended_____------ -$--1---  -          ----           $11, 511.63
Amount (estimated) required to be appropriated for completion of
  existiing project----------                                              874. 00
                                                                     1--------------------------------

Amount that can be profitably expended in fiscal year ending June
30, 1939:
   For new work -- _----------------       -     -    -        -     116, 874.00
   For maintenance__-- -----                          ___        -    15, 000. 00

      Total___-----------------------------_                         131, 874. 00

                               15. PORT ARANSAS,   TEX.

   Location.-Port Aransas is on the southern portion of the coast of
Texas, 180 miles southwest of Galveston and 132 miles north of the
mouth of the Rio Grande. (See U. S. Coast and Geodetic Survey
Map No. 1285.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1879.
   The improvement was taken over by the Aransas Pass Harbor Co.
on June 30, 1890, under authority of the act of May 12, 1890. This
company relinquished its rights to the United States on March 27,
1899. The cost and expenditures by the United States were $1,092,-
079.29, all for new work. In addition thereto there was expended by
the citizens of Rockport and Corpus Christi the sum of $9,938.93,
and by the Aransas Pass Harbor Co. the sum of $401,554.18, making
a total of expenditures by the United States and local interests of
$1,503,572.40. For further details see page 1861 of Annual Report
for 1915.
   Existing project.-This provides for two rubblestone jetties ex-
tending into the Gulf from St. Joseph and Mustang Islands, the
project lengths of which are 11,190 and 8,650 feet, respectively, and
for a channel 700 feet wide and 37 feet deep extending from deep
water in the Gulf to a point opposite the outer end of the south
jetty, thence decreasing to 600 feet wide and 35 feet deep at a point
opposite station 90, north jetty; thence 35 feet deep and 600 feet
wide to Cline Point (the inner basin) ; thence a channel 35 feet deep
and 400 feet wide (decreasing to a width of 300 feet) to a point
opposite the western end of the basin dredged by the Humble Oil
& Refining Co., at its docks on Harbor Island, with widening opposite
the northwest corner of Mustang Island.
   The project flirther provides for a stone dike on St. Joseph Island
about 19,100 feet long connecting with the north jetty and extending
ip this island to prevent a channel being cut around the north jetty;
for an inner basin at Harbor Island, 30 feet deep at mean low tide
650 feet wide, and about 3,000 feet long; and for the dredging of
an approach channel 12 feet deep at mean low tide and 100 feet wide
with basin at end leading from Harbor Island Basin to the town of
Port Aransas.
   Under ordinary conditions the mean tidal range is about 1.1 feet
and the extreme range about 2 feet. The height of tides is depend-
ent to some extent on the winds, and during strong "northers" in
the winter season the water surface may be depressed 2 feet below
mean low tide.
   The estimate of cost for new work, revised in 1935, exclusive of
amounts expended on previous project and of $105,000 contributed
        RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                817
by local interests, is $2,934,500. The latest (1935) approved estimate
for annual cost of maintenance is $290,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for taking over the
old or curved portion of the north jetty, which had been constructed
by private parties; the acts of June 13, 1902, and March 3, 1905,
provided for the completion of this old or curved portion according
to the plans of its builders; act of March 2, 1907, provided for the
extension shoreward of the old curved portion of the north jetty to
connect with St. Joseph Island and for the construction of the south
jetty (Rivers and Harbors Committee Doc. No. 5, 59th Cong., 2d
sess.); act of February 27, 1911, authorized dredging of the road-
stead in the Harbor Island Basin to a depth of 20 feet and 10,000
linear feet of the stone dike on St. Joseph Island (H. Doc. No. 1094,
61st Cong., 3d sess.) ; act of March 4, 1913, provided for the deepen-
ing of the channel between the jetties and the Harbor Island Basin
to 25 feet, for the extension of the jetties, the extension of the stone
dike on St. Joseph Island 9,100 feet, and for the approach channel
12 feet deep to the town of Port Aransas (H. Doc. No. 1125, 62d Cong.,
3d sess.); act of July 3, 1930, provided for deepening the entrance
channel from the Gulf of Mexico to Harbor Island and the provi-
sion of an inner basin at Harbor Island of reduced area but greater
depth (H. Doc. No. 214, 70th Cong., 1st sess.) ; and act of August 30,
1935, provided for enlarging all channels from the Gulf to the west-
ern end of the basin dredged by the Humble Oil & Refining Co. at
its dock on Harbor Island (Rivers and Harbors Committee Doc.
No. 35, 72d Cong., 1st sess., and No. 40, 73d Cong., 2d sess.). Prior
to adoption by the River and Harbor Act of 1935, the project modi-
fications contained in the last two mentioned documents had been
authorized by the Public Works Administration September 6, 1933,
and February 16, 1935.
    The latest published maps are in the three last-mentioned docu-
ments.
    Local cooperation.-Fully complied with.
    Terminal facilities.-The principal terminal facilities are located
,on Harbor Island at the head of Aransas Pass and consist of a single
wooden steamship wharf about 1,000 feet long, with a wooden shed,
terminal tracks and switches, and a terminal railroad leading thence
to the town of Arkansas Pass on the mainland, about 61/2 miles dis-
tant, where it connects with the San Antonio & Aransas Pass Rail-
way (Southern Pacific Railway system). In addition to these there
is an oil-loading dock of creosoted timber construction leased by the
Atlantic Pipe Line Co. These terminal facilities are privately owned,
but open to all on equal terms. At the inner end of the 12-foot chan-
nel leading to the town of Port Aransas the public wharf, built by the
town, is open to general public use. These terminal facilities are
considered adequate for the present commerce. Additional terminal
facilities are located at Corpus Christi, Ingleside, and on Harbor
Island. (See report on Channel from Aransas Pass to Corpus Christi,
Tex.)
    Operations and results during fiscal year-Maintenance.-A con-
tract for repairs to the inner end of the south jetty by placing a con-
crete cap thereon was completed from July 1 to September 10, 1936,
818            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

by placing 1,337.32 cubic yards of concrete along a length of 950 feet,
of jetty, at a cost of $26,929.48.
   A contract for installing 3 fishway culverts in the south jetty was
completed from September 25 to October 13, 1936, at a cost of
$7,149.45.
   A contract for redredging the inner basin was completed from No-
vember 8 to December 19, 1936, by the removal of 539,306 cubic yards
from a basin length of 3,850 feet, at a cost of $48,902.70.
   The U. S. seagoing hopper dredge Manhattan redredged the inner
and outer channels from August 5, 1936, to January 31, 1937, remov-
ing 1,291,422 cubic yards, at a cost of $137,084.10.
   A payment of $1,971 was made in setttlement of a claim for work
performed during the fiscal year 1935 in repairing the north jetty.
   Miscellaneous surveys and inspections were made at a cost of
$10,967.46.
   The total cost of all work during the fiscal year was $233,004.19, all
for maintenance. The expenditures were $250,478.56.
   Condition at end of fiscal year.-The modified existing project was
about 60 percent completed. The two jetties have been built to par-
tial project lengths, the north jetty being 9,240 feet long and the south
jetty 7,385 feet long. A stone dike connecting with the north jetty
has been constructed on St. Joseph Island, its total length being 20,-
991 feet; this part of the project was completed in 1916. The channel
between the jetties from the Harbor Island Basin to the Gulf has been
dredged to 35 feet at mean low tide inside and 37 feet deep at the
Gulf end. Harbor Island Basin has been deepened to 30 feet at mean
low tide over an area 650 feet wide and about 1,000 feet long at the
lower end adjacent to the dock.
   The approach channel from Harbor Island Basin to the town of
Port Aransas was completed in 1914.
   To complete the project would require extension of the jetties and
enlargement of Harbor Island Basin.
   The controlling depths at mean low tide along the center line of
the channels were as follows:
   Channel seaward of the jettied entrance, 35.5 feet; from end of jet-
ties to westward end of the Humble Oil & Refining Co. turning basin,
34.5 feet; channel to and including the turning basin at Port Aransas,
12 feet; inner basin, at Harbor Island, 30 feet.
   The total cost of the existing project to June 30, 1937, was as
follows:

                                                                       New work          Maintenance            Total

Regular funds_ _----------____ -- __--__-___ ___-   -.   $2, 269, 515. 46                $3, 371, 973. 19   $5, 641, 488. 65
Public Works funds.....---------------------------------     324, 287. 14 ---                .--...-  __-       324, 287.14
      Total United States funds_         ___-----   ------       ___   2, 593, 802. 60    3, 371, 973. 19    5, 965, 775. 79
Contributed funds.       ..   -            -         -       -         .            -       135, 651. 34        135, 651. 34
      Total (all funds)..........._____________..____    .   __ .      2, 593, 802. 60    3, 507, 624. 53    6, 101,427. 13



  The total expenditures were $5,964,077.85, of which $5,639,790.71
was from regular funds, and $324,287.14 from Public Works funds.
In addition, $135,651.34 was expended from contributed funds for
maintenance.
             RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                      819

  Proposed operations.-The funds unexpended and accounts receiv-
able at the end of the fiscal year amounting to $157,420.47, including
an allotment of $152,000 made during July 1937 will be applied as,
follows:
Accounts payable June 30, 1937______-___--__-------_-------------    $1,753. 32
.Maintenance :
    Dredge sea bar and jetty channel with United States seagoing
       hopper dredge (October and November 1937 and April to June
       1938) -----------------------     --------------------      125, 667. 15
    Corpus Christi, Tex., field office expenses (July 1937 to June
      1938-----------------------------------------------------      30,. 000.00

            Total _       _______________-----___
                                          ----                                                       157, 420.47
  The additional sum of $290,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance :
    Dredging sea bar and jetty channel with United States seagoing
       hopper dredge (July to November 1938) ---------------------        $120, 000
    Dredge inner harbor basin at Port Aransas by contract (Febru-
       ary to June 1939) ------------------------------------------- 40, 000
    Repairs to north jetty (July to December 1938)                         106, 000
    Corpus Christi, Tex., field office expenses (July 1938 to June 1939)_   24, 000

         Total -----------------------------------------------------                                      290, 00

                                      Cost and financial summary

Cost of new work to June 30, 1937_---------------------------$3, 685, 881.89
Cost of maintenance to June 30, 1937---- _______----___ -23, 371,973.19
      Total cost of permanent work to June 30, 1937----------                                    7, 057, 855. 0
Plus accounts receivable June 30, 1937------------------------                                            55.38

      Gross total costs to June 30, 1937                                                          , 057, 910. 46
                                                                                                 7----------------------
Minus accounts payable June 30, 1937-------------------------                                          1, 753. 32

      Net total expenditures _.-________ -------------                                     2" 77, 056, 157.14
Unexpended balance June 30, 1937----------------------                                     -        5, 365. 09

         Total amount appropriated to June 30, 1937------------                                  7, 061, 522.23

    Fiscal year ending June 30            1933            1934           1935           1936               1937


Cost of new work$____________ _____________            $203, 362. 53   $74, 622. 57   $46, 676. 24 ..............
Cost of maintenance------------  121, 234. 90           133, 981.97    191, 352. 98   219, 556. 43        $233, 004. 19
      Total cost ---------------        121, 234. 90    337, 344. 50   265, 975. 55   266, 232. 67        233, 004. 19
Total expended----------------          137, 044. 12    330, 350. 28   244, 258. 78   275, 851. 13        250, 478. 56
Allotted.....----------------------     182, 273. 42   596, 411. 76    254, 183. 85   125, 903. 20         13, 000. 00


Balance unexpended July 1, 1936___--- ---- _______________  $242, 843. 65
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936 -------------------------------------   15, 000. 00
      Amount to be accounted for------------------------------                                       257, 843.65
Deductions on account of revocation of allotment---- ------------                                      2, 000. 00
        Net amount to be accounted for                                      255, 843. 65
Gross amount expended_ ---- _------                    -_    $251, 300. 66
  1Includes $324,287.14 from Public Works funds.
  2 In addition, $135,651.34 was expended from contributed funds for maintenance.
820        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Less reimbursements collected---_----------_    _   _       $822. 10
                                                                       $250, 478. 56
      Balance unexpended June 30, 1937________________________            5, 365. 09
Outstanding liabilities June 30, 1937 ___________   _______________       1, 796. 67
      Balance available June 30, 1937___________________________          3, 568. 42
Accounts receivable June 30, 1937_______
                                      _______________________                 55. 38

      Unobligated balance available June 30, 1937______________           3, 623. 80
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-______ ________--______________                152, 000. 00
     Balance available for fiscal year 1938_________________            155, 623. 80
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance         ______   ____________                290, 000. 00
  * Exclusive of available funds.

                     16.   BRAZOS    ISLAND    HARBOR,   TEX.

   Location.--This harbor is at the extreme south end of the coast of
Texas, about 7 miles north of the mouth of the Rio Grande, and
about 125 miles south of Port Aransas. The harbor is at the inner
end of Brazos Santiago Pass, which lies between Brazos and Padre
Islands, and is the natural outlet from the Laguna Madre to the
Gulf of Mexico. (See U. S. Coast and Geodetic Survey Chart No.
1288.)
   Previous projects.-Authorized by River and Harbor Acts of June
18, 1878, March 3, 1881, and March 2, 1919. The total costs and
expenditures were $675,855.30. In addition, $123,361.67 was ex-
pended from contributed funds for new work, a total of $799,216.97.
For further details see page 1017, Annual Report for 1932.
   Existing project.-This provides for a channel 31 feet deep and
300 feet wide through Brazos Santiago Pass; for a channel 28 feet
deep and 100 feet wide from the pass to a point on the westerly side
of Long Island; for a channel 28 feet deep and 100 feet wide from
the end of the Brazos Santiago Pass-Long Island Channel to and
including a turning basin 600 feet wide by 700 feet long at Point
Isabel; for a channel 28 feet deep and 100 feet wide from the end
of Brazos Santiago Pass-Long Island Channel to and including a turn-
ing basin 1,300 feet long and 1,000 feet wide in the vicinity of Browns-
ville and for the easement of bends and curves. The project also pro-
vides for two jetties at the Brazos Santiago Pass entrance. The
project further provides that all inside channels and turning basins.
may be widened with the approval of the Chief of Engineers pro-
vided local interests bear the entire cost. Under ordinary condi-
tions the mean tidal range is about 11/2 feet and the extreme range
about 2 feet. The height of the tides is dependent, to some extent,
on the wind, and during strong "northers" in the winter season the
water surface in the southern end of the Laguna Madre may be raised
4 feet or rmore above the mean low tide in the Gulf.
   The estimate of cost for new work, revised in 1937, is $5,368,000,
inclusive of $2,425,000 contributed by local interests, but exclusive
of amounts expended on previous projects. The latest (1937) ap-
proved estimate of annual cost of maintenance is $150,000.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (Rivers and Harbors Committee Doc. No. 16, 71st
       RIVERS AND HARBORS-GALVESTON,          TEX., DISTRICT     821
Cong., 2d sess.). The Public Works Administration, May 24, 1934,
and the River and Harbor Act of August 30, 1935, modified the
project by eliminating the provision requiring local interests to con-
tribute specific sums of money, and in lieu thereof, stipulated that
local interests shall contribute funds sufficient to cover the entire
cost of the original dredging of all channels and turning basins in-
side the entrance channel through Brazos Santiago Pass; all other-
conditions of local cooperation heretofore established to remain in
full force and effect (Rivers and Harbors Committee Doc. No. 10,
72d Cong., 1st sess.). The River and Harbor Act of August 26,
1937, modified the project by providing for deepening the jetty
channel to 31 feet, and all inner channels and the Brownsville and
Port Isabel turning basins to 28 feet (Rivers and Harbors Com-
mitice Doe. No. 32, 75th Cong., 1st sess.). This project provides.
that no dredging shall be done at public expense within 50 feet of
an established pierhead line or any wharf or structure. The latest
published map is in the last document referred to above.
   Local cooperation.-All required cooperation for the 25-foot depth
project has been furnished. The modified project provides that local
interests shall furnish, free of cost to the United States, necessary
rights-of-way and spoil-disposal areas.
   Terminal facilities.-On the turning basin at Point Isabel, there is.
a steel-sheet pile wharf about 550 feet long provided with 2 sheet-
metal transit sheds each 100 feet wide and 300 feet long. Local
interests have constructed a ship side cold-storage and air-condition-
ing plant of approximately 200 cars capacity. An oil refinery and
tank farm served by a pipe line is located near the Point Isabel turn-
ing basin. This refinery has a daily capacity of 1,000 barrels of
gasoline and the tank farm has a storage capacity of 264,000 barrels.
There is an oil dock 300 feet long on the turning basin equipped for-
receiving and loading oil cargoes.
   The entire terminal system has railroad and highway connections.
and is open to all on equal terms. All docks and wharves are
equipped with facilities for bunkering ships and servicing with fresh
water and electric current.
   Local interests at Brownsville have constructed along the north
side of the turning basin three concrete wharves each approximately
400 feet long. Two are provided with sheet metal covered transit
sheds, each approximately 80 feet wide and 400 feet long.
   Along the west side of the turning basin there is being constructed
a concrete wharf about 400 feet long to be provided with a sheet
metal covered transit shed. All docks and wharves are equipped with
facilities for servicing ships with fresh water and electric current.
There are no bunkering facilities at this terminal. To the eastward
of the general cargo terminal there has been constructed a creosoted-
pile oil dock for unloading refined-oil cargoes into nearby storage
tanks of approximately 15,000 barrels capacity. This terminal has
railroad and highway connections and is open to all on equal terms.
   The terminals as provided and proposed at Point Isabel and
Brownsville are sufficient for existing and prospective commerce.
   Operations and results during fiscal year-Maintenance.-The.
stone aprons on each side and near the outei ends of the north and
south jetties were repaired under contract from October 13, 1936, to
822            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

June 30, 1937. The work performed consisted of placing 7,369.33
tons of riprap stone over a total distance of 6,000 feet, at a cost of
$45,620.75.
   The U. S. seagoing hopper dredge Galveston from July 1 to
August 30, 1936, redredged the jetty channel, and the channel from
inside Brazos Santiago Pass across the Laguna Madre to Long
Island, removing 446,602 cubic yards from the jetty channel and
225,852 cubic yards from Laguna Madre Channel, a total of 672,454
cubic yards, at a cost of $50,191.18.
   The U. S. seagoing hopper dredge Manhattan from April 11 to
June 10, 1937, redredged the jetty channel and a portion of the
channel westward of Long Island to the turning basis near Brown-
ville, removing 481,180 cubic yards from the jetty channel and 58,350
cubic yards from the Brownsville Channel, a total of 539,530 cubic
yards, at a cost of $49,018.09.
   With a leased derrick boat from August 1 to August 11, 1936,
there were removed from the jetty channel 180 railroad rails, a large
quantity of rubbish, chain, and the hull of a wrecked schooner, at
a cost of $4,811.35.
   Miscellaneous surveys and inspections were made at a cost of
$11,334.26.
   The total cost of all work during the year was $160,975.63, all for
maintenance. The total expenditures were $180,266.19.
   Condition at end of fiscal year.--The 25-foot project channels and
basins were completed in 1936. The jetties were completed in 1935.
The work remaining to be done to complete the project is deepening
of all channels and basins. The project is about 80 percent com-
pleted.
   Controlling depths at mean low tide on June 30, 1937, in the vari-
ous channels comprising the waterway are as follows:
   Channel from deep water in the Gulf of Mexico through the jetty
channel to inside Brazos-Santiago Pass, 32 feet over a bottom width
of 300 feet; channel from inside Brazos-Santiago Pass to a point
westward of Long Island, 26.5 feet over a bottom width of 100 feet;
channel from westward of Long Island to the turning basin at Point
Isabel, 25 feet over a bottom width of 100 feet; turning basin at
Point Isabel, 27.5 feet over a bottom length of 700 feet and a bottom
width of 600 feet; channel from westward of Long Island to turning
basin near Brownsville, 25 feet over a 100-foot bottom width; and
turning basin near Brownsville, 25 feet over a bottom length of 1,300
feet and a bottom width of 1,000 feet.
   The total cost of the existing project to June 30, 1937 was as
follows:

                                                                                  New work         Maintenance        Total

Regular funds______...._........._-------...---.......
                                                   ----....      ____..... _       $67, 715. 01     $535, 799. 71    $603, 514. 72
Public Works funds_ ........-....-------------.-                      -   ..     2, 848, 560. 03 --------           2, 848, 560. 03
     Total, United States funds----          ..... -----------   ______          2, 916, 275. 04    535, 799. 71    3, 452. 074. 75
Contributed funds.-----... ----..........---- --------    ......               . 1, 683, 257. 70 -----------_ .     1, 683, 257. 70
       Total, all funds.............------------------------.............
                                                                      --         4, 599, 532. 74     535, 799. 71   5, 135, 332. 45



  The total expenditures were $3,442,178.64, of which $593,618.61 was
from regular funds and $2,848,560.03 from Public Works funds.
                  RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                               823

  In addition, $1,683,257.70 was expended from contributed funds.
  Proposed operations.-The funds unexpended and accounts receiv-
able at the end of the fiscal year, amounting to $145,437.36, including
an allotment of $114,000 made during July 1937, will be applied as
follows:
Accounts payable June 30, 1937----------------------------------         $9, 896. 11
Maintenance :
    Dredging jetty channel with United States seagoing hopper
      dredge (September and October 1937) --------------                 50, 000.00
    Dredging inside channels and turning basins with United States
      seagoing hopper dredge (April and May 1938) _____-----50,              000. 00
    Completion of repairs to the north and south jetties under ex-
      isting contract (July 1937) --------------------------------        2, 000. 00
    Brownsville, Tex., field office expenses (July 1937 to June 1938)__- 33, 541. 25

              Total         _____--------------------                                                                 145, 437.36
  The additional sum of $735,000 can be profitably expended during
the fiscal year 1939, as follows:
New work:
   Dredging jetty channel with United States seagoing hopper dredge
     (July and August 1938) -------------------------------------   $50, 000
   Dredging inside channels and turning basins, under contract
     (August 1938 to January 1939) -------------------------------  535, 000
             Total for new work___________________-----------------------------------------                              585, 000

Maintenance:
   Dredging jetty channel with United States seagoing hopper dredge
      (April and May 1939)---------------------------------------                                                         48,000
   Repairs to the north and south jetties, by contract (July to Decem-
      ber 1938)              ----     -----------------                                                                   84, 000
   Brownsville, Tex., field office expenses (July 1938 to June 1939)__                                                    18, 000

             Total for maintenance                                                                                             (00
                                                                                                                         1---------------------------
             Total for all work                                                                                          7________________-_
                                                                                                                          35, 000
                                                    Cost and financial summary
Cost of new work to June 30, 1937--------------------------12 $3, 592, 130. 34
Cost of maintenance to June 30, 1937-----------------------       535, 799. 71
      Total cost of permanent work to June 30, 1937-----------                                                   4, 127, 930. 05
Minus accounts payable June 30, 1937________________                                                                  9, 896. 11
     Net total expenditures-     -                          12 4, 118, 033. 94
                                         -_______________________
Unexpended balance June 30, 1937------------------------           31, 437. 36
             Total amount appropriated to June 30, 1937                                                         4, 149, 471.
                                                                                                            1_____________2      30

     Fiscal year ending June 30                        1933             1934              1935           1936             1937


Cost of new work __.......... .                           $11. 40    $873, 668.47 $1, 946, 129. 22     $87, 152. 65
Cost of maintenance-------------                       4, 459. 11       5, 131. 69     95, 931. 04     269, 302. 24     $160, 975. 63
         Total cost----------------                    4, 470. 51     878, 800. 16   2, 042, 060. 26   356, 454. 89      160, 975. 63

Total expended------------------.................      3, 688.57      705, 789. 09   2, 198, 447. 75   344,183. 92       180, 266. 19

Allotted--....--------------------                     8, 498. 64   2, 804, 081.50     229, 194.93     446, 532. 45     -30, 000. 06


    2Includes $2,848,560.03 from Public Works funds.
    2In addition $1,806,619.37 expended from contributed funds.
824             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 ----------------------------                                              $241, 703. 55
Deductions on account of revocation of allotment-------------                                               30, 000. 00

      Net amount to be accounted for----------------------                                                     211, 703. 55
Gross amount expended___---------------------       $180, 266. 42
Less reimbursements collected. --------------------          .23
                                                                                                               180,266. 19

       Balance unexpended June 30, 1937_________-----------------                                               31, 437. 36
Outstanding liabilities June 30, 1937---------------- $9, 941. 22
Amount covered by uncompleted contracts_-----------7, 381. 38
                                                                                                                17, 322. 60

      Balance available June 30, 1937______________.....                                                        14, 114. 76
Amount allotted from War Department Civil Appropriations Act
  approved July 19, 1937-------------------                                                                    114, 000. 00

     Balance available for fiscal year 1938 ______ ______----_128,                                                 114. 76
Amount (estimated) required to be appropriated for completion
of existing project ------------------------------------------                                            585, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
of existing project 3________________________________--__                                                     585, 000. 00
                      - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -
   For maintenance 3                                                                                            50, 000. 00

       Total 3-------------------------------------------------                                                735, 000. 00
   8Exclusive of available funds.
   17. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                     (GENERAL)

   The cost of the work during the year was $112,746.48; the expendi-
tures were $114,169.13. The balance unexpended at the end of the
fiscal year, amounting to $68,635.22, including an allotment of
$55,500 made during July 1937, will be applied as needed during the
fiscal year 1938 to payment of expenses incurred under this heading.
The additional sum of $100,000 can be profitably expended during
the fiscal year ending June 30, 1939.
                                        Cost and financial summary

Cost of new work to June 30, 1937
'Cost of maintenance to June 30, 1937                                                                       434, 511. 44
                                                                                                           $_____________________
           Total cost of permanent work to June 30, 1937                          --------------               434, 511. 44
Minus accounts payable June 30, 1937____.____________________                                                    1, 414. 24

     Net total expenditures______________---------------_________                                              433, 097. 20
Unexpended balance June 30, 1937___-_________________                                                           13, 135. 22
           Total amount appropriated to June 30, 1937---------------                                       446, 232. 42

           Fiscal year ending June 30                 1933            1934          1935            1936            1937


Cost of new work .----------
Cost of maintenance                               $36, 974. 51    $53, 874. 44   $90, 128. 51   $48, 741. 78     $112, 746. 48
Total expended....-                                 36, 980. 47    56, 273. 12   86,073.13       46, 306. 59      114, 169. 13
Allotted          ____
              ----------------------------          41, 587. 19   133, 740. 97    27, 353. 40   104, 00. 000       28, 550. 86
            RIVERS AND HARBORS-GALVESTON, TEX., DISTRICT                                                              825
]Balance unexpended July 1, 1936 ------------    --    ---- -----                                         $98s,     753. 40
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934__-- ___      _____$----------1,308.56
Amount allotted from War Department Appropriation
   Act approved Apr. 9, 1935_------------------
                                   _           _3,                                            691. 44
Amount allotted from War Department Appropriation
Act approved May 15, 1936----------------------- 26, 050. 8
                                                                                                              31.    "-5D
                                                                                                                       86'

         Amount to be accounted for________-----------129,804.                                                             35
Deductions on account of revocation of allotment_                                       ---    ----            2, 5~.0.    00
       Net amount to be accounted for__-------------- -------                                             12T,      04. 35
Gross amount expended ______---------  _-----------    114, 29& 86
Less reimbursements collected--- ---------------------      129. 73
                                                                                                          114 169. 13

         Balance unexpended June 30, 193_-----__------------                                    13,135. 22
Outstanding liabilities June 30, 1937                                                   922. 54
                                                                                    $___________-----1,
Amount covered by uncompleted contracts _______--                                    2, 252. 99
                                                                                                 4, 175 53

      Balance available June 30, 1937 ___-_--------------------                                                8, 959. 69
Amount allotted from War Department Civil Appro-
priation Act approved July 19, 1937--------------------- ----                                                55, 500. 00

         Balance available for fiscal year 1938 _--                              ----                         64, 459. 69

Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance 1______--                                                                           000. 00
                                                                                                          1-----00,
   1Exclusive of available funds.

18. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                    [Commercial statistics for these projects are given in pt. 2 of report]

                                                               For last      Cost and expenditures
                                                                full re-        to June 30, 1937               Estimated
                     Name of project                           port
                                                               Annual see                                       amount
                                                                                                                required
                                                               Report        New work           Mainte-          to com-
                                                                 for-                           nance              plete

1. Johnsons Bayou, La.l__                                        1933         $2, 261. 35      $54, 042. 26          (2)
2. Turtle Bayou, Tex. 3______________________________            1932          8,899. 97        57, 685. 83          (2)
3. Mouth of Trinity River, Tex.l                       -_        1928         79, 540. 44  10, 870. 95               (2)
4. Trinity River, Tex.....______________________________         1932       2,002,661.37 4605, 340. 82               (2)
5. Dickinson Bayou, Tex.'                 -                      1931          6, 287. 28  55, 553. 83              (2)
6. Chocolate Bayou, Tex.'              --                        1922          6, 512. 12  33, 248. 17                $8, 500
7. Bastrop Bayou, Tex.'                                          1931          9, 920. 22       27, 129. 21           10, 000
8. Brazos River, Tex., from Velasco to Old Washington 1          1924        216, 989. 48 223, 010. 52               (2)
9. Guadalupe River to Victoria, Tex.'                            1922        172, 547. 28 106, 100. 36               (2)
10. Rio Grande, flood control_________________                   1934         41, 833. 84 ._.........                (2)

  1 Channel adequate   for commerce.
  2 Completed.
3 The existing project for Turtle Bayou, Tex., was abandoned by Public Act No. 20, ch. 36, 75th
Cong., 1st. sess., approved Mar. 10, 1937. No further repcrt will be made on this project.
  Includes $252,659.92 for operating and care under the permanent indefinite appropriation.

         19. PLANT ALLOTMENT                    FOR GALVESTON, TEX. DISTRICT

                                   Cost and financial summary

Undistributed costs June 30, 1937________________------------                                         $1, 644, 235. 09
Plus accounts receivable June 30, 1937_____    ___------------                                             32, 159. 97

         Gross total costs to June 30, 1937--__-_____                                                   1-----------
                                                                                                        1, 676, 395. 06
826                   REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937-                                                                                     $100, 680. 43
      Net total expenditures                                                                                           575, 714. 63
                                                                                                                    1-----------------------------------
Unexpended balance June 30, 1937 ______                                                  -            -__________________
                                                                                                                       176, 491. 39
             Total amount appropriated to June 30, 1937______                                                             1______
                                                                                                                          1, 752, 206. 02

     Fiscal year ending June 30                       1933                  1934                1935               1936             1937


Total expended_... .... _ __.......      ..........          ...   _ _      ....     .. $1, 944, 456. 47      $17, 872. 23    -$386, 614. 07
Allotted _.........                      --------------------------
                                          ..                                              2, 043, 737. 46     -22, 500. 00     -269, 031. 44-


Balance unexpended July 1, 1936-_______________________    ___                                                               $58, 908. 76
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-----------------------------------------                                                               301, 171. 48
     Amount to be accounted for-----------------------------                                                                 360, 080. 24
Deductions on account of revocation of allotment_ ________-___-                                                              570, 202. 92

      Net amount to be accounted for-........                                                                             -- 210, 122. 68
Gross amount expended_____-___-___________            $1, 560, 077.98
Less-
    Reimbursements collected---    $1, 937, 339. 35
    Receipts from sales-----------         9, 352. 70
                                                       1, 946, 692. 05
                                                                                                                          -386,     614. 07
       Balance unexpended June 30, 1937----------------------                                                                176, 491. 39
Outstanding liabilities June 30, 1937 _________162,                                                                              6. 55
       Balance available June 30, 1937-------------------------                                                               13, 827. 84
Accounts receivable June 30, 1937_-----------------------------                                                              32, 159. 97

             Unobligated balance available June 30, 1937-------------                                                         45, 987. 81
Status of reports called for by river and harbor acts and committee resolutions

                                                                          Date trans-                                        Recommenda-
            Locality                  Authorization Act                   mitted to               Document no.                   tion
                                                                           Congress

Aliens Creek, tributary           River and Harbor Act,
of Brazos River in                 Aug. 26, 1937.
Austin County, Tex.,
navigation and flood
control.
Anahuac Channel, Tex.             Rivers and Harbors                     Apr.      1, 1937 I-----------....   ..      _-. I Unfavorable.
                                    Committee resolu-
                                    tion, Jan. 24, 1936.
Arroyo Colorado, Tex.,            River and Harbor
  from Llano Grande                 Act, Aug. 30, 1935.
  Lake to its mouth.
Arroyo Colorado, Tex.,            River and Harbor
  a channel from a point            Act, Aug. 26, 1937.
  near Mercedes, Tex.,
  to its mouth, thence
  to Port Isabel via
  Laguna Madre.
Brazos Island Harbor,             Rivers and Harbors                     May 13, 1937          Rivers and Harbors            Favorable.
  Tex.                              Committee resolu-                                            Committee, 32, 75th
                                    tion, Dec. 7, 1936.                                          Cong., 1st sess.
Brazos        River,     Tex.,    River and Harbor                                            ------------------------
   (comprehensive         sur-        Act, Aug. 26, 1937.
vey).
Colorado River, Tex ...           Senate     Committee                   Dec. 10,
                                                                              10, 1936
                                                                         Dec.
                                                                                  1936         Senate    Committee                Do.
                                    resolution, May 4,                                           print, 75th Cong.,
                                      1936.                                                      1stsess.
      Do-.....-- -          -__ Senate    Committee
                                 resolution, Aug. 4,
                                      1936.
             RIVERS AND HARBORS-GALVESTON,                                     TEX., DISTRICT                   827
Status of reports called for by river and harbor acts and committee resolutions-
                                     Continued

                                                            Date trans-
         Locality              Authorization Act            mitted to          Document no.           Recommenda-
                                                             Congress

Colorado         River        and River and       Harbor _..        --------
                                                                          ------------------------

  tributaries, Tex.                Act, Aug. 26, 1937.
Corpus Christi, Tex., ----- do......---          ........-  _------------ ------------------------

  construction of break-
  waters, sea walls, or
  jetties..
Goose Creek, Tex., deep .....--       do     -...............
                                                           ---------------------------------------

  water channel and
  port.
Houston Ship Channel,             Senate Committee res- --------------- ------------------------
  Tex. (includes flood              olution, Feb. 20,
  control,Buffalo Bayou).           1936.
Laguna Madre to the River and Harbor Act,              ---------------
                                                                              ------------------------
  Gulf of Mexico, channel           Aug. 26, 1937.
  across Padre Island,
  Tex.
Lavaca River, Tex., nav- .....----do_-.
  igation and flood con-
  trol.
Louisiana and Texas In-
  tracoastal Waterway,
                                  Rivers and Harbors
                                    Committee resolu-
                                                        --------------- ------------------------
  Corpus Christi to Rio            tion, Apr. 1, 1935.
  Grande Valley.
Mill Creek, a tributary           River and Harbor Act,
  of Brazos River in               Aug. 26, 1937.
  Austin County, Tex.,
  navigation and flood
  control.
Navidad River, Tex.,                 do_------------                             ----------------------
  navigation and flood
  control.
Neches River, Tex. (pre- Flood Control Act,                                      ----------------------
  liminary examination             May 15, 1936.
  for flood control).
Neches River, Tex .---            Rivers and Harbors Nov. 6, 1936                ---------------------- Unfavorable.
                                   Committee resolu-
                                   tion, Aug. 23, 1935.
Nueces River and tribu- Flood Control Act,                                  ----------------------

  taries, Tex. (prelimi-           June 4, 1936.
  nary examination for
  flood control).
Palacios, Tex., at Camp           River and Harbor Act,
  John A. Hulen, chan-             Aug. 26, 1937.
  nel to Intracoastal
  Waterway.
Pass     Cavallo,           Tex., Rivers and Harbors June 16,1937 Rivers and Harbors                    Favorable.
  channel from, to Port             Committee resolu-                            Committee, 37, 75th
  Lavaca, Tex.                     tion, Jan. 4, 1937.                           Cong., 1st sess.
Sabine-Neches             Water- River and Harbor Act,                        ------------------------
  way, Tex.                        Aug. 26, 1937.
Sabine-Neches Water- Rivers and Harbors Aug. 24, 1936 Rivers and Harbors                                   Do.
  way, Tex.                         Committee resolu-                             Committee, 3, 75th
                                   tion, Oct. 29, 1935.                          Cong., 1st sess.
     D o-....----.         _---   Rivers and Harbors        Feb. 25, 1937      Rivers and Harbors          Do.
                                    Committee resolu-                             Committee, 20, 75th
                                   tion, Mar. 26, 1936.                          Cong., 1st sess.
Sabine River (prelimi- Flood Control Act,                                     ------------------------
  nary examination for              May 15, 1936.
  flood control).
San Antonio Bay, Tex.,            River and Harbor Act,                       ------------------------
  to Gulf of Mexico,               Aug. 26, 1937.
  channel.
Texas City, Channel, Rivers and Harbors July 21, 1937, Rivers and Harbors                                  Do.
  Tex.                              Committee resolu-                             Committee, 47, 75th
                                   tion, May 12, 1937.                           Cong., 1st sess.
     Do.....-........----         River and Harbor Act, .............. ................. ......
                                   Aug. 26, 1937.
Trinity River and tribu- River and Harbor Act, _............. ........................
  taries, Tex., flood pro-         July 27, 1916.
  tection, etc.
Trinity River, Tex. (pre- Flood Control Act,            ...............       ........................
  liminary examination              May 31, 1924.
  for flood control).
Trinity River, Tex......          Senate     Committee ......... _.....        ............. .........-
                                   resolution, Dec. 10,
                                    1929.
     Do ._..---......... River and Harbor Act, ...... ...                 ... ........................
                                   July 3, 1930.
828     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

IMPROVEMENT OF RIVERS AND HARBORS IN THE
       MINERAL WELLS, TEXAS, DISTRICT
  This district was established April 1, 1936, and comprises the
watershed of the Brazos River and tributaries entering the same
north of Washington, Tex.
  District Engineer: Capt. H. A. Montgomery, Corps of Engineers.
  Division Engineer: Col. F. B. Wilby, Corps of Engineers.
              POSSUM KINGDOM DAM AND RESERVOIR

    Location.-The dam site is located in Palo Pinto County, Tex.,,
on the Brazos River about 18 miles northwest of Mineral Wells, Tex.
The Brazos River has its source in the Staked Plains about 40 miles
west of the New Mexico-Texas boundary line, and flows south and
east approximately 1,300 miles to the Gulf of Mexico. The site of
the dam is 685 miles above the mouth of the river. (.See U. S. Geo-
logical survey map, Pickwick topographical quadrangle, Texas, scale
1:62,500.)
    Existing project.-The existing project provides for the construc-
tion of a dam and reservoir on the Brazos River at Possum Kingdom
Bend, and is one of 13 dams planned by the Brazos River conserva-
tion and reclamation district for flood control, the impounded waters
to be later available for beneficial uses.
    The estimated cost for new work revised in 1937, is $6,698,461,,
exclusive of amounts to be contributed by local interests.
   No work has been authorized by Congress. The dam is to be con-
structed under the provisions of the Emergency Relief Act of 1935,
by authority contained in Presidential Letter No. 668, dated Sep-
tember 26, 1935, to the Secretary of the Treasury and letter of the
Secretary of War, dated February 5, 1936, to the Administrator of
the Works Progress Administration.
   Local cooperation.-The Brazos River conservation and reclama-
tion district is to furnish all necessary land and flowage easements,
tools, and sundry equipment in total amount of $591,000 and is to
assume responsibility for maintenance and operation of completed'
structure. Under these requirements the district is making the
necessary surveys, etc., for full compliance.
   Operations and results during fiscal year.-Field investigations
for foundation conditions, availability of construction materials.
hydrologic conditions, etc., were completed. Designs and specifica-
tions for the construction of the dam and of pertinent works were
completed. The expenditures were $282,261.70.
   Condition at end of fiscal year.-No construction work has been
done. Total cost and expenditure to June 30, 1937, was $333,573.10
for preliminary work.
   Proposed operations.-It is proposed to continue field explora-
tions and design until definite advice is received as to continuation
of the project. The unexpended balance of funds allotted from the
Emergency Relief Act of 1935, including accounts receivable at the
          RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                       829

end of the year, and the allotment of $20,000 from the Emergency
Relief Act of 1937 will be applied as follows:
Accounts payable, June 30, 1937      _______   ________----------------                 $4, 334. 13
Unobligated balance, June 30, 1937 reverting to the Treasury..__                       263, 498. 64
Field explorations, design, and office maintenance- --   '     -                        20, 000. 00

                                  Cost and financial summary
Net total expenditures to June 30, 1937_-_ __---- -------------                       $333, 573. 10
Total amount appropriated to June 30, 1937_-------------------                         600, 000. 00

IMPROVEMENT OF RIVERS AND HARBORS                                                     IN    THE
         VICKSBURG, MISS., DISTRICT
   The streams under improvement in this district are tributaries of
the Mississippi River which flow through northwestern Mississippi,
southern Arkansas, southern Oklahoma, northern Texas, and the
northern half of the State of Louisiana.
  District engineer: Lt. Col. Lunsford E. Oliver, Corps of Engineers,
to June 1, 1937, and Maj. R. G. Moses, Corps of Engineers, since that
date.
  Division engineer: Brig. Gen. H. B. Ferguson, Corps of Engineers.
                                              IMPROVEMENTS

                                               Page                                           Page
1. Red River below Fulton, Ark_                 829   12. Other projects for which no
2. Cypress Bayou and Water-                                 estimates are submitted_.          853
     way between Jefferson,                           13. Plant allotment-                     853
     Tex., and Shreveport, La _                 831
3. Ouachita and Black Rivers,                                Flood-control projects
     Ark. and La.___                            834
                                                    14. Red River Basin, La_ ___ .
4. Tensas   River and Bayou                                                                    854
     Macon, La_____________                     839 15. Ouachita River Basin, La___            855
5. Boeuf River, La_ --             --           841 16. Sardis Reservoir, Miss ____            856
6. Bayous D'Arbonne and Cor-                        17. Big Black River, Miss__                860
     ney, La __           -          -          843              Relief projects
7. Yazoo River, Miss_                           844
8. Yalobusha River, Miss -...                   846 18. Denison Reservoir, Tex....             860
9. Big Sunflower River, Miss___                 847 19. Colfax Cut-off, La____ __              861
10. Mouth of the Yazoo River,                       20. Long Prairie district levees,
        Miss-                 -                 851       Ark. _                               862
11. Examinations, surveys, and                      21. Grant Parish levees, La____            862
        contingencies (general)          __     852 22. Fire Point Cut-off, La --              863

                   1. RED RIVER BELOW FULTON, ARK.

  Location.-Red River rises in the arid regions of eastern New
Mexico, flows in a general easterly and southeasterly direction for
1,300 miles, and enters the Mississippi River at Red River Landing,
La. (See U. S. Geological Survey State maps.)
   Previous projects.-Adopted by the River and Harbor Acts of
May 23, 1828, June 10, 1872, June 18, 1878, March 3, 1879, August 2,
1882, July 5, 1884, August 11, 1888, and September 19, 1890.                                 The
cost and expenditures before existing project was adopted, July 13,
1892, were $1,553,877.50, for new work. For further details, see page
1868 of annual report for 1915.
830       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for continuing improvement of
Red River from Fulton, Ark., to the Atchafalaya River, La., 463
miles, by systematic clearing of the banks, snagging, dredging shoals,
building levees (either alone or in cooperation with riparian States),
closing outlets, revetting caving banks, and preventing injurious
cut-offs. The lower end of the section included in the project is 7.6
miles above the mouth of the river. No proposed channel dimensions
were given.
   Floods ordinarily cause fluctuations of stage between high and low
water of from 30 to 45 feet. Unusual floods occasionally increase
this range about 10 feet.
   The work being continuous, no estimate for completion was made.
The latest (1933) approved estimate for annual cost of maintenance
is $75,000.
   The existing project was adopted by the River and Harbor Act of
July 13, 1892 (Annual Reports for 1890, p. 1829, and for 1891, p.
1957). (For latest published map see H. Doc. No. 848, 65th Cong.,
2d sess.)
   Terminal facilities.-Red River Barge Line owns a warehouse at
Moncla Landing, which is open to the general public; however, it is
inot being used. There are no terminal facilities at Alexandria or
Shreveport, La.
   Operations and results during fiscal year.-During periods from
July 1 to October 25 the U. S. dredge Todd removed 274,384 cubic
yards of material at points from mouth of Kings Bayou to the
mouth of Old River. This work is classed as maintenance and was
all done by hired labor.
Cost of dredging------- -----                                   $39, 853. 27
Cost of chopping and snagging----------------------------------       37. 21
      Total cost of maintenance--------------------------              40, 390. 48
Total expended ------------------------------------------------        40, 390. 48
   Condition at end of fiscal year.-The work under the existing project
being continuous, and no estimate being made, the date or percentage
of completion cannot be stated. Maintenance in recent years provides
navigation to Shreveport, La., at medium and high stages. The head
of navigation is the Arkansas-Oklahoma State line, to which point
boats may occasionally run during high water if snags, overhanging
trees, or similar obstructions do not interfere. From January to July
the prevailing stage is 6 feet and over, and minimum depths are about
4 feet to Fulton, Ark., 5 feet to Shreveport, La., and 6 feet to Alex-
andria, La. During the remainder of the year stages near zero may
be expected, with minimum depths less than 1 foot from Fulton to
Shreveport, 1 to 2 feet from Shreveport to Alexandria, 4 feet from
Alexandria to mouth of Black River, and 6.5 feet from thence to the
mouth. The controlling depth at the end of the fiscal year was 23.2
feet to the mouth of Black River and about 3.9 feet from there to
Fulton, Ark.
   Costs and expenditure under the existing project to June 30, 1937,
were:
For new work--                                     _-_-_---_-----_-----
                                                                 _-$409, 928. 91
For maintenance-                                   _-----_-_----_--_----
                                                                   _1, 535, 571. 03
       Total cost------------------             _____              1, 945, 499. 94
Total expended__--_-_---_--_-_-_------                        _-_-_1, 945, 499. 94
              RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                                  831
    Proposed operations.-The balance unexpended at the end of the
fiscal year, and additional funds allotted during July 1937, will be ap-
plied to maintenance, using Government plant and hired labor, as
follows:
Maintenance:
    Dredging, mouth of Red River to mouth of Black River, with
      United States pipe-line dredge Waterbury, 21/2 months (Sep-
         tember, October, and November 1937) -------------------- $44, 000.00
    Chopping, mouth of Black River to Shreveport, La., with
      United States quarterboat No. 3001, 2 months (May and June
      1938) -----------------------------------------------------   8, 677.27

             Total for all work--------------------------------------                                          52, 677. 27
    The additional sum of $42,500 can be profitably expended during the
fiscal year 1939, using Government plant and hired labor, as follows:
Maintenance :
    Dredging, mouth of Red River to mouth of Black River, with United
       States pipe-line dredge Waterway, 2 months (September and
       October 1.938)------------------------------ ----------------  $34, 500
    Chopping, mouth of Black River to Shreveport, La., with United
       States quarterboat No. 3001, 2 months (August and September
       1938) -------------------------------------------------------    8, 000

               Total for all work----------------------------------------_                                             42, 500

                                         Cost and financial summary
Cost of new work to June 30, 1937_--------------------------                                          $1, 963, 806. 41
Cost of maintenance to June 30, 1937                                                                    , 535, 571. 03
                                                                                                       1---------------------------
           Total cost of permanent work to June 30, 1937                         ------------           3, 499, 377. 44

Net total expenditures---------------------------------------                                           3, 499, 377. 44
Unexpended balance June 30, 1937------------------------------                                               4, 677.27
           Total amount appropriated to June 30, 1937-----------_                                       3, 504, 054. 71

    Fiscal year ending June 30              1933               1934            1935           1936                    1937


Cost of new work____              __         -------------------
Cost of maintenance----...........        $34, 380. 90      $26, 030. 74     $13, 715. 15   $19, 287. 81             $40, 390. 48
Total expended_.-----.-.-.---.             21, 296. 40     -29, 956. 10     -75, 159. 64     19, 546. 22              40, 390. 48

Allotted     -------------------------     23, 957. 14     -10, 445. 97    -125, 341.07         -76. 34...........


Balance unexpended July 1, 1936-------                                                                      $45, 087. 75
Gross amount expended-------------------- ------                                                             40, 390.48

     Balance unexpended June 30, 1937---------------------                                                     4, 677. 27
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------------------------                                                  48, 000. 00

      Balance available for fiscal year 1938-----                       ------                               52, 677. 27
Amount that can be profitably expended in fiscal year ending
                                   1- - - - - - - - - - - - - - - - - - - - - - - - - -
June 30, 1939, for maintenance                                                                              42, 500. 00
1 Exclusive of available funds.
2. CYPRESS BAYOU AND WATERWAY BETWEEN JEFFERSON,                                                                       TEX.,
                  AND SHREVEPORT, LA.
  Location.--This bayou rises in northeast Texas and flows in a
southeasterly direction to Caddo Lake, through this lake to Big
     20196---37-pt. 1-----53
832       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Willow Pass, and through Big and Little Willow Passes, Soda
Lake, Twelve Mile Bayou, the new diversion canal, and Cross Bayou
to the Red River at Shreveport, La., a distance of about 132 miles.
(See U. S. Geological Survey State maps.)
  Strictly speaking, Cypress Bayou proper ends where it enters
Caddo Lake, but the name is frequently applied to the whole water-
way above described.
  Existing project.-This provides for dredging and straightening
the channel, removing obstructions, and clearing the banks in the
lower 66 miles of Cypress Bayou from the Red River at Shreveport,
La., to Jefferson, Tex., and for the construction of a dam without a
lock at the foot of Caddo Lake.
                               CADDO   LAKE   DAM

  Location: At foot of Caddo Lake, La. and Tex., about 23 miles above mouth
of Jefferson-Shreveport Waterway.
  Below Mooringsport, La.: 2 miles.
  Length: 3,400 feet.
  Type: Fixed, on pile foundation.
  Date of completion: December 21, 1914.
  Cost : $100,553.47.
   Below the dam the fluctuations of the water level depend chiefly
upon back water from the Red River, the maximum being about 10
feet. At the dam the fluctuations are from zero to 8 feet above the
crest of the spillway, and at Jefferson the maximum is 24.2 feet.
   The estimate of cost for new work was $20,000 for open-channel
work (Annual Report, 1872) and $100,000 for the dam (1907). The
latest (1933) approved estimate for annual cost of maintenance is
$1,700.
   The existing project was authorized by the following river and
harbor acts: The act of June 10, 1872, provided for open-channel
work (Annual Report for 1872, p. 572); the act of June 25, 1910,
provided for the construction of the dam (H. Doc. No. 220, 60th
Cong., 1st sess.). The latest published map is in House Document
No. 236, Sixty-third Congress, first session.
   Terminal facilities.-There is one publicly owned brick warehouse,
50 by 150 feet, at Jefferson, Tex. The following terminal facilities
are located at Mooringsport, La.:
  One   privately owned covered dock, 60 by 60 feet, open to all small boats.
  One   privately owned open wharf, 36 by 60 feet.
  One   privately owned pipe rack, not decked.
  Two   privately owned warehouses, 60 by 100 feet.
  One   privately owned boat ways.
   The warehouse at Jefferson has not been used for several years,
since no commerce has moved in that vicinity. The wharves, docks,
and warehouses at Mooringsport are all owned by oil companies.
There are no terminal facilities at Shreveport. The existing ter-
minal facilities are considered adequate for present commerce.
   Operations and results during fiscal year.-The work consists of
caring for Caddo Lake Dam. The cost was $1,620.52, and the
expenditure, $1,603.42, all for maintenance.
   Condition at end of fiscal year.--The dam at the foot of Caddo
Lake was completed in 1914, completing the project. Its construc-
tion and maintenance insures a 4-foot navigable depth at low water
from that point to Jefferson, the head of navigation, but cuts off
                 RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                                                833

all possible navigation to Shreveport except for such light-draft
boats as may pass over the dam at high stages. Below the dam
navigation is largely dependent on backwater from Red River. A
stage from 15 to 24 feet on the Red River gage at Shreveport,
depending on the run-off from Cypress Bayou drainage area, is
necessary to provide a 4-foot depth up to the dam. Such stages
are short in duration and irregular in occurrence. The controlling
depth between the dam and Jefferson, Tex., was about 4 feet at
the end of the year.
   The total costs and expenditures under the existing project to
June 30, 1937, have been as follows:

                                                                                                       United             Contrib-
                                                                                                       States            uted funds       Total
                                                                                                       funds

Cost of new work................................---------------------------------------$202, 817.48 .....---------....
                                                                                                                $202, 817. 48
Cost of maintenance.. _...--    ___        ___      __        ___.__
                                                      .........    ...       _ _-_---     238, 220. 30 $50, 000  288, 220. 30
      Total cost_-.---           _---. ..                                         -------------
                                                                                  .-.               .---- 441,037. 78        50, 000    491,037. 78
Total expended................................................------------------------------------------  440, 903. 72       50, 000    490, 903.72



   Proposed operations.-The balance unexpended at the end of the
fiscal year and additional funds allotted during July 1937 will be
applied to maintenance, using hired labor, as follows:
Accounts payable June 30, 1937 -------       ---           $134. 06
Mantenance :
   Salary of dam tender---------------------------   $1,260.00
   Repairs to dam-----------------------------------    464. 74
                                                                                                                                        1, 724. 74

             Total for all work                        ----------------------------------                                               1, 858. 80
  The additional sum of $1,700 can be profitably expended during
the fiscal year 1939, as follows:
Salary of dam tender----------       ---------------------------                                                                            $1, 260
Repairs to dam-----------      -----         --                                                                                                 440
             Total for all work ---------------------------------------                                                                      1, 700
                                                   Cost and financial summary
Cost of new work to June 30, 1937-------------------------- $202,817. 48
Cost of maintenance to June 30, 1937--- -------------------- 238, 220. 30
      Total cost of permanent work to June 30, 1937------------- 441, 037. 78
Minus accounts payable June 30, 1937----------------------------       34. 06
      Net total expenditures--------------------  ---------- 1440, 903. 72
Unexpended balance June 30, 1937------------------------------     328. 80
             Total amount appropriated to June 30, 1937-------------                                                               1441, 232. 52

             Fiscal year ending June 30                                1933               1934              1935            1936            1937

Cost ofnew work ...---
Cost of maintenance------....                 ------------
                                                             --           ---
                                                                    $1, 248.28
                                                                                    -I
                                                                                       $1,159. 75
                                                                                                        i- --
                                                                                                      ---
                                                                                                         $1, 657.48
                                                                                                                             . . ....
                                                                                                                          $1. 406.87
                                                                                                                                        - $1,620.52
Total expended-             _       ..
                                  --.--..-.                           1, 223. 23         1, 142. 35       1, 587. 69       1, 402. 15       1, 603. 42
Allotted-.------.--------.....-.---                                   1,387.41           1,626.50         3,200.00------------              -600.00

    1 In    addition, $50,000 contributed funds expended for maintenance.
834       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936    _----------                      $2, 532. 22
Deductions on account of revocation of allotment-------------------     600. 00

      Net amount to be accounted for                                         932. 22
                                                                          1--------------------------,
Gross amount expended---------------                                          03.42
                                                                             6----------------------,
      Balance unexpended June 30, 1937--------------------------       328. 80
Outstanding liabilities June 30, 1937-----------------------------136.      00

     Balance available June 30, 1937- ------------------------              192. 80
Amount allotted from War Department Civil Appropriations Act ap-
proved July 19, 1937------------         ---------------------- ----     1, 530. 00

      Balance available for fiscal year 1938---------------------         1, 722. 80

Amount that can be profitably expended in fiscal year ending June 30,
                                 -- --                       - - -- - -
1939, for maintenance 2----                                              1', 700.00
  SExclusive of available funds.

            3. OUACHITA AND BLACK RIVERS, ARK. AND LA.

   Location.-Ouachita River rises in Polk County, Ark., and flows
about 600 miles in a general southeasterly and southerly direction
through Arkansas and Louisiana. It is joined by Tensas and Little
Rivers at Trinity, La. (Jonesville, La.), below which place it is called
Black River, and enters Red River 35.5 miles above its mouth. (See
U. S. Geological Survey State maps.)
   Previous projects.-The project was adopted by the River and
Harbor Acts of March 3, 1871, June 10, 1872, August 14, 1876, and
July 5, 1884. The amount expended before existing project was
adopted, June 13, 1902, was $605,802.19 for new work. A separate
project for work in the Ouachita River between Camden and Arka-
delphia was adopted by the River and Harbor Act of August 11, 1888,
and $9,000 was expended on this portion of the river for new work.
There was expended on lock and dam no. 7, since eliminated from the
project, the sum of $59,265.44, making a grand total of $674,067.63, all
for new work, which also represents the cost. (For further details,
see p. 1869 of the Annual Report for 1915.)
   Existing project.-This proposes to obtain a navigable depth of
61/2 feet at low water from the mouth of Black River, La., to Cam-
den, Ark., a distance of 351 miles, by the construction of six locks
and dams, with necessary dredging, and to remove logs, wrecks, and
overhanging trees, etc., between mouth of Black River and Arka-
delphia, Ark., 417 miles, and to provide a channel 7 feet deep and of
suitable width from the improved channel of the Ouachita River
above dam no. 6 to the vicinity of the railroad bridge over Lake St.
Mary, thence a canal of the same depth and 70 feet in width along
the south side of the railroad embankment to high ground near Felsen-
thal, a distance of 3,600 feet, with a suitable turning basin near the
inner end.
   The location and description of the locks and dams which are in-
cluded in the project are contained in the table following.
             RIVERS AND HARBORS-VICKSBURG,                                 MISS., DISTRICT                      835


                                               Distance
                                                 from                             Greatest                   Depth
                                                nearest    Above                  available                 on miter
                                               town or                 Width                   Lift at
                                                mouth                  of lockm    legth        low           sill at
No.                   Location                        mou ofmouth
                                                             Black                 for full                  normal
                                                nearest     Rier      chamber       width      water           pool
                                               naviga-                             of lock                    level
                                               ble trib-
                                                 utary


                                               Miles       AIiles       Feet        Feet        Feet           Feet
  2   Harrisonburg, La...-------------------    1 0. 1        73. 3        55         268         14. 4            6.   9
  3   Riverton, La----------------------        12. 0        134. 0        55         268         14. 8            6.   5
  4   Monroe, La_------------------            12 4. 0       178.1         55         268          8. 9            6.   5
  5   Sterlington Reach, La----.----------        1. 6       208. 3        55         268          6. 9            6.   6
  6   Near Felsenthal, Ark-____-          -  -    3. 31      238. 7        55         268
                                                                                      268
                                                                                                   9. 7
                                                                                                  13. 5
                                                                                                                   7.
                                                                                                                   6.
                                                                                                                        6
                                                                                                                        5
  8   Near Calion, Ark------------------1        10. 5       297. 5        55


                                                                                        Year Year
                                       of     Kind of                                 opened   of
                             Character         dam         Type of construction          to   com-           Cost
No.        Location           foundation
                                                                                        navi- ple-
                                                                                       gation tion


  2   Harrisonburg, La_     Piling in clay.   Movable_    Concrete Poiree needle    1918        1921      $470,394. 69
                                                           dam; steel mitering
                                                           lock gates.
  3   Riverton, La-.....    Piling in sand __do
                                           --   ..--          do------------------- 1919        1920        681,072. 84
  4   Monroe, La- __       --    doo-----------do-.-_         do---                     1915    1915      3 641, 630.23
  5   Sterlington Reach,    Piling in clay .-. do..       Conctete Chanoine wick        1924    1926        901,096. 17
        La.                                                 et dam; steel mitering
                                                            gates.
  6   Near Felsenthal,  Piling in sand_ _-_do-----.....     dodo---------------
                                                           ..-----                      1913    1923      4914,844. 67
       Ark.
  8   Near Calion, Ark_ Piling in clay. __do ........         do.. ---------------      1912    1926      5 915, 445.96

  1 Nearest town.
   2 By river-2 miles by highway.
   3 Dam failed Aug. 10, 1917, and was rebuilt under permanent indefinite appropriation for operating and
care of canals. Type of dam now is concrete Poiree needle pass and Chanoine wicket weir.
   4 Includes cost of original structure to June 30, 1919 ($559,539.34), and the cost of modifications to permit
elimination of lock and dam 7 ($355,305.33).
   6 Includes actual cost of original structure to June 30, 1919 ($592,922.43), and the cost of modifications to
permit elimination of locks and dams 7 and 9 ($322,523.53).


   Floods ordinarily cause fluctuations of stage from 25 to 45 feet
between high and low water. Extreme floods occasionally increase
this range about 10 feet.
   The latest revised estimate of cost of the system of locks and dams,
made in October 1920, as modified by the actual cost of nos. 2, 3, 4,
and 6, since completed, was $4;576,838.52. The estimate of cost for
construction of the canal to Felsenthal, made in 1936, is $36,000.
The latest (1933) approved estimate for annual cost of maintaining
the improvement by removing obstructions to navigation between
Camden, Ark., and the mouth of Black River, La., is $100,000. No
estimate for maintenance above Camden has been approved. The
latest (1936) approved estimate of annual cost of maintaining the
canal to Felsenthal, is $2,000. The estimate of annual cost of opera-
tion and care, made in 1936, is $205,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the construction
of locks and dams nos. 4 and 6; act of March 2, 1907, provided for
locks and dams nos. 2 and 8; act of June 25, 1910, provided for ob-
836     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

taining sites for locks and dams nos. 3 and 7; act of July 25, 1912,
for their construction; act of August 8, 1917, provided for the con-
struction of lock and dam no. 5; act of March 2, 1919, provided for
modifying locks and dams nos. 6 and 8 to raise their pool levels, which
with dredging will obviate the necessity for constructing locks and
dams nos. 7 and 9. (Rivers and Harbors Committee Doc. No. 7, 65th
Cong. 2d sess.)
   The act of March 3, 1871, provided for open-channel work from
Arkadelphia to the mouth, and the act of July 5, 1884, provided for
the extension of such work in that portion of the stream known as
Black River. The canalization work of the project is based on re-
port contained in House Document No. 448, Fifty-seventh Congress,
first session (Annual Report for 1902, p. 1435). The act of August
26, 1937, provided for the 7-foot channel and for construction of a
canal 3,600 feet long to Felsenthal, Ark. (Senate Committee Print,
75th Cong., 1st sess.)
   Lock and dam no. 1 was eliminated from the plan by the Secre-
tary of War under authority given by the River and Harbor Act
of March 2, 1907. The open-channel work of the project is based on
reports submitted in House Executive Document No. 60, part 4,
Forty-first Congress, third session, and the Annual Report of 1883,
page 1155. Operation and care of locks and dams were included in
the project July 1, 1935, under the provisions of the Permanent
Appropriations Repeal Act approved June 26, 1934. The latest
published maps of the section of these rivers included in the project
are in the Annual Report for 1913, page 2336, and Senate Committee
Print, Seventy-fifth Congress, first session.
   Local cooperation.-Local interests contributed $5,000 during the
fiscal year 1929, which was expended in connection with United States
funds in prevention of cut-off near Camden, Ark. The River and
Harbor Act of August 26, 1937, authorized construction of the canal
to Felsenthal, Ark., subject to the condition that local interests
fiurnish, free of cost to the United States, necessary rights-of-way
and suitable spoil-disposal areas for new work and for subsequent
maintenance as required, release the United States from all claims
for damages attributable to the work of improvement, and agree to
construct a suitable warehouse at the canal terminal and to provide
a highway at an elevation above that of the 1932 high water, from
the main highwNay system to the canal terminal. Local cooperation
is not yet assured.
   Terminal faciiities.-At Monroe, La., there is one private electric
crane and two private warehouses. At West Monroe there are three
private warehouses with conveyors. At Calion, Ark., there is one
private warehouse with conveyor. At Camden, Ark., there are three
private warehouses. These existing facilities are considered adequate
for the present commerce.
   Operations and results during fiscal year.-During periods from
July 7 to October 30, 1936, and April 10 to June 30, 1937, the U. S.
dredge Todd removed 1,113,397 cubic yards of material from the
channel at various points from Camden Landing, mile 350.8, to Ber-
lew bar, mile 2.2. During July the U. S. dredge Waterway removed
64,792 cubic yards of material from the channel at various points
from Blue Beach Shoal, mile 336.0, to the Missouri-Pacific Railroad
bridge, mile 207.4.
          RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                              837
   The U. S. quarterboat No. 5 removed 298 obstructions from the
channel between Camden, Ark., and Monroe, La., a distance of 183
miles.
   The six locks and dams were operated and maintained in a satis-
factory condition throughout the year.
   This work is classed as maintenance and was all done by hired
labor.
Cost of dredging    ----------------------------------------                $141, 594. 67
Cost of snagging and chopping- --    -----------------------                   9, 392. 98
      Total cost of channel maintenance---------------------  150, 987. 65
Cost of operating and care of locks and dams-----------------126, 277. 95
      Total cost of maintenance                                              277, 265. 60
Total expended---- ------------------------------------                      278, 683. 07
   Condition at end of fiscal year.-The six locks and dams embraced
in the existing project for slack-water improvement of the Ouachita
River were completed in 1924 and provide navigation to Camden,
Ark. (See table under Existing project.)
   Construction of the canal to Felsenthal, authorized in 1937, has not
been started. The head of navigation is Arkadelphia, Ark., to which
point boats may occasionally run during high water if snags, over-
hanging trees, or other similar obstructions do not interfere. From
January to June the gage at Monroe generally exceeds pool stage
 (13.3 feet), caused by the river above, and minimum depths exceed-
ing 7 feet are usual between the mouth of Black River and Camden,
Ark., a distance of 350.8 miles. At intervals during this period the
reading of the Camden gage exceeds 15 feet, and minimum depths
of 7 feet may be expected between Camden and Arkadelphia. Dur-
ing the remainder of the year the pools furnished by dams nos. 2, 3,
4, 5, 6, and 8, with moderate dredging in Black and Ouachita Rivers,
provide depths of 6.5 feet between the mouth of Black River and
Camden, Ark., and depths of only a few inches may be expected
between Camden and Arkadelphia, Ark.
   The controlling depth at the end of the fiscal year was 21.6 feet
to lock and dam no. 2 and 7.9 feet from there to Camden, Ark.
Cost of new work under existing project to June 30, 1937 _---  $4, 574, 551. 31
Cost of maintenance        --------------------------------     1, 870, 450. 74
Cost of operating and care of locks and dams------------------      229,223. 08
      Total cost-     ------------------------------------                 6, 674, 225. 13
Total expended______________-------------        -----------------------   6, 637, 062. 12
  In addition, the sum of $2,940,952.07 was expended between Jan-
uary 25, 1913, and June 30, 1936, on operating and care of the works
of improvement under the provision of the permanent indefinite
appropriation for such purposes.
  Proposed operations.-The balance unexpended plus accounts re-
ceivable at the end of the fiscal year, and additional funds allotted
during July 1937, will be applied to maintenance, using Govern-
ment plant and hired labor, as follows:
Accounts payable June 30, 1937   --------------------------- $37,211. 23
Maintenance of channel:
     Dredging with U. S. pipe-line dredge Todd, 6
      months (July, August, September, and October,
       1937. and May and June 1938)_ _______ __-    $94, 000. 00
838-      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Maintenance of channel--Continued.
   Snagging with derrick boat and U. S. towboat Capt.
      Eric Bergland, 2 months (August and Septem-
      ber 1937----    -----------------------------   $16, 000.00
   Chopping with U. S. quarterboat No. 10, 3 months
      (July, August, and September 1937)------------12, 000. 00
                                                                                 $122, 000. 00
Operating and care of locks and dams:
   Operation ---------     --------------------------            62, 500.   00
   Ordinary repairs      -----------------------                 47, 500.   00
   Improvement and reconstruction ------------                   92, 500.   00
   Emergencies----------------       -----------------            8, 124.   54
                                                                                  210, 624. 54
       Total for all work____-----------     ------------------                  369, 835. 77
  The additional sum of $353,500 can be profitably expended during
the fiscal year 1939, as follows:
New work: Felsenthal Canal: Dredging a channel 7 feet deep and
  of suitable width from the improved channel in Ouachita River
  above dam no. 6 to the vicinity of the railroad bridge over Lake
  St. Mary thence a canal of the same depth and 70 feet in width
  along the south side of railway embankment to high ground near
  Felsenthal, a distance of 3,600 feet, with a suitable turning basin
  near the inner end ------                ___________---------         $36, 000. 00
Maintenance of channel :
    Dredging with U. S. pipe-line dredge Todd, 81/
       months (July, August, September, October, No-
       vember, and December 1938 and one-half April,
       May, and June 1939)                                      000.00
                                                          $-----------------------133,
     Snagging with derrick boat and U. S. towboat
      Capt. Eric Bergland, 2 months (August and Sep-
      tember 1938) ------------------------------           12, 500. 00
    Chopping with U. S. quarterboat No. 10, 11/2
      months (July and August 1938)        --------------    6, 000. 00
                                                                        151, 500. 00
Operating and care of locks and dams:
    Operation-----------------------------------            70, 000. 00
    Ordinary repairs -___________________- -          __    41, 500. 00
    Improvement and reconstruction----------------- 51, 500. 00
    Emergencies3---------------------------------             , 000. 00
                                                                        166, 000. 00

       Total for all work______       ___-________         -        -_______353, 500. 00
                           Cost and financial summary
Cost of new work to June 30, 1937                                               248, 618. 94
                                                                            $------------------------5,
Cost of maintenance to June 30, 1937-----------------------                  5, 040, 625.89
      Total cost of permanent work to June 30, 1937---------- 10, 289, 244. 83
Undistributed costs June 30, 1937_--------------_                 -3, 994. 82
      Net total cost to June 30, 1937-----------------------10, 285, 250. 01
Plus accounts receivable June 30, 1937------------------- -----   4, 043. 04
     Gross total costs to June 30, 1937 -------------------- 10,289, 293. 05
Minus accounts payable June 30, 1937--___________________        37, 211.23
     Net total expenditures       ----------------------------
Unexpended balance June 30, 1937---..
                                                                        10, 252, 081. 82
                                              ___-__     ---- ___---65,               792.73
       Total amount appropriated to June 30, 1937___-____ _110, 317, 874. 55
1Includes $2,940,952.07 from permanent indefinite appropriation for operating and care.
            RIVERS AND HARBORS--VICKSBURG, MISS., DISTRICT                                                                            839

   Fiscal year ending June 30                    1933                1934                1935                1936                 1937


Cost of new work....
Cost of maintenance     .....        ..       $349, 758. 41      $377, 819. 42       $360, 543. 32      $330, 938. 44           $277, 265. 60
Total expended----------------                 382, 207. 57       299, 197. 40         75, 365. 84        296, 574. 65           278, 683. 07
Allotted-----   -----------------              401, 069. 05       300, 625. 76         35, 529. 55        276, 354. 23


Balance unexpended July 1, 1936-------------------------                                                                 $344, 475. 80
Gross amount expended__--------------------------$294, 267. 94
Less reimbursements collected---------------------   5, 584. 87
                                                                                                                          278, 683. 07

      Balance unexpended June 30, 1937------------- -----------                                                            65, 792. 73
Outstanding liabilities June 30, 1937---------------------------                                                           37, 211. 23
      Balance available June 30, 1937--------------------------                                                            28, 581.50
Accounts receivable June 30, 1937----------------- -----------                                                              4, 043.04

Unobligated balance available June 30, 1937---------------------                                                           32, 624. 54
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------                                                             300,000.00

        Balance available for fiscal year 1938---------------------                                                       332, 624. 54

Amount (estimated) required to be appropriated for completion
   of existing project          2-                      _________-____--                                                   3,     000.   00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2_______________________________________                                                                  36, 000. 00
   For maintenance 2----------------------------     --  -                                                               317, 500. 00
                       ------ --          -    - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - -
         Total 2- -                                                                                                      353, 500. 00
  2 Exclusive of available funds.

                     4. TENSAS RIVER AND BAYOU MACON, LA.

   Location.-Tensas River has its source in Lake Providence, East
Carroll Parish, La., flows about 166 miles in a general southerly di-
rection and joins Ouachita and Little Rivers at Jonesville, La., in
forming Black River. Bayou Macon rises in Desha County, Ark.,
flows about 250 miles in a general southerly direction and enters
Tensas River 42.7 miles above the mouth. (See Mississippi River
Commission map, Alluvial Valley of the Mississippi River.)
   Previous projects.-The original project was adopted by the River
and Harbor Act approved March 3, 1881. The cost and expenditures
prior to adoption of existing project July 5, 1884, were $3,000 for
new work. (For further details see p. 1871 of Annual Report for
1915.)
   Existing project.-This provides for the removal of snags, sunken
logs, and overhanging timber on Tensas River from Tendal (for-
merly Dallas), La., to the mouth, 137.8 miles, and on Bayou Macon
from Floyd, La., to the mouth, 111.6 miles, and for dredging the
bars between Chamberlain Bar and Kirk Ferry, in the Tensas River,
10 miles and 38 miles, respectively, above the mouth to a depth of
4 feet and width of 60 feet.
840      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   At medium and high stages the channel under improvement in
these streams has an average width of about 150 feet, with minimum
depth of about 8 feet. Floods ordinarily cause fluctuations of stage
of about 45 feet between high and low water. Extreme floods occa-
sionally increase the range about 10 feet.
   The estimate of cost for new work, revised in 1922, exclusive of
amount expended on previous project is $48,395, of which $4,200 is
to be contributed by local interests. The latest (1933) approved
estimate for annual cost of maintenance is $2,500.
   The existing project was adopted by the following river and harbor
acts: The act of July 5, 1884, provided for removal of snags, etc.
 (H. Ex. Doc. No. 38, 46th Cong., 3d sess.), and the act of September
22, 1922, provided for dredging the channel in Tensas River (H. Doc.
No. 95, 67th Cong., 1st sess.). A map of both streams is published in
the Annual Report for 1913, page 2336.
   Local cooperation.-The River and Harbor Act of September 22,
1922, required that local interests contribute $4,200 to be used for
dredging bars between Chamberlain and Kirk Ferry. Local interests
have made no progress in complying with this requirement and do
not appear to be interested.
   Terminal facilities.-None.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 75
percent completed. Tendal, La., on Tensas River, and Floyd, La.,
on Bayou Macon, are the heads of navigation, but due to the non-
completion of the project above Westwood Place on Tensas River
navigation above this point is limited to small craft and rafted
timber.
    In ordinary seasons a depth of 6 feet or more may usually be
expected from January to June on these streams. During the re-
mainder of the year the depth is usually reduced to about 1 foot. A
gage reading of 3.5 feet or more at Delhi, La., is favorable for light-
draft navigation and 6.5 feet or more for heavy-draft navigation
on Bayou Macon. A gage reading of 20 feet or more at Clayton, La.,
is favorable for light-draft navigation and 23 feet or more is favor-
able for heavy-draft navigation on Tensas River. The controlling
depths at the end of the fiscal year were 9.6 feet on Tensas River
and about 2.5 feet on Bayou Macon. The work remaining to com-
plete the project consists in removing the remaining obstructions
from Tensas River between Westwood Place and Tendal (formerly
Dallas), and dredging in that river between Chamberlain and Kirk
Ferry, authorized by the River and Harbor Act approved September
22, 1922.
Cost of new work under existing project to June 30, 1937---------- $35, 366. 57
Cost of maintenance_--------------------------------------          85, 352.16
      Total cost------------------------------ -----------------    120, 718. 73
Total expended_--------------------- --------    ---                120, 718. 73
  Proposed operations.-The balance unexpended, $3,107.62, will be
applied to bank clearing and blasting obstructions between the
mouth of Tensas River and Tendal, La., on Tensas River, and Delhi,
La., on Bayou Macon, during October 1937.
  The sum of $2,500 can be profitably expended during the fiscal
year 1939, using Government plant and hired labor to be applied
               RIVERS AND HARBORS--VICKSBURG, MISS., DISTRICT                                                                      841
to bank clearing and blasting obstructions from Dehli, La., to mouth
of Bayou Macon and from Tendal, La., to mouth of Tensas River
during October 1938.
                                               Cost and financial summary

                                    -------------------
Cost of new work to June 30, 1937_____                                                                                 $38, 366. 57
Cost of maintenance to June 30, 1937------------------------                                                            85, 352.16

           Total cost of permanent work to June 30, 1937-----.-------                                                  123, 718. 73

Net total expenditures-_______----                            123, 718. 73
Unexpended balance June 30, 1937-----------------------------   3, 107. 62

           Total amount appropriated to June 30. 1937..--..----------126, 826. 35


    Fiscal year ending June 30                    1933               1934                 1935               1936               1937

Cost of new work------------................     $2,504. 13    .................................
Cost of maintenance-------.........-----...       1, 883. 46      $2, 194. 21            $1,989. 25--------.-----                  ------

        Total cost-----------------               4, 387. 59        2, 194. 21            1, 989. 25--------

Total expended---------              -------    -3, 389. 53         2, 194. 32            1, 978. 40            $16.90 ------

Allotted-         -------   ----------         -15, 229. 70         2, 358. 74            2, 500.00          -150. 00---               .-------




Balance unexpended July 1, 1936__                ------------                                                              $3, 107. 62
Balance unexpended June 30, 1937-----------------------------                                                               3, 107. 62

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ------------------------------------                                                            2, 500. 00
   'Exclusive of available funds.

                                                5. BOEUF RIVER, LA.

   Location.-This river rises in Desha County, Ark., flows about 240
miles in a general southerly direction and enters Ouachita River at
Sicily Island Gorge. (See Mississippi River Commission map, Allu-
vial Valley of the Mississippi River.)
   Existing project.-This provides for the removal of snags, logs,
and overhanging trees between Wallace Landing and the mouth, a
distance of 166 miles. The project was afterward modified to in-
clude the closure of three outlets near Point Jefferson.
   At medium and high stages the channel has an average width of
about 200 feet with minimum depth of about 8 feet. Floods ordi-
narily cause fluctuations of stages of about 30 feet between high and
low water. Extreme floods occasionally increase this range about
10 feet.
   The estimate of cost for new work for removing snags, etc., made
in 1880, is $20,020. The estimate of cost for new work for closing
the outlets, revised in 1928, is $15,000. The latest (1933) approved
estimate for annual cost of maintenance is $2,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the removal of
snags, etc. (H. Ex. Doc. No. 38, 46th Cong., 3d sess.), and the acts
of August 5, 1886, and August 11, 1888, provided for closing the
outlets (H. Ex. Doc. No. 99, 48th Cong., 2d sess.). (For latest pub-
lished map see Annual Report for 1913, p. 2336.)
842          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Recommended modifications of project.-It is recommended that
this project be modified by the elimination of all work above Girard,
La. (The abandonment of the entire project was erroneously recom-
mended in H. Doc. No. 467, 69th Cong., 1st sess.)
  Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is about 67
percent completed. The head of navigation is Wallace Landing.
The removal of snags was completed in 1896 as far upstream as
Point Jefferson, 150.8 miles above the mouth. Navigation above this
point is limited to small craft and rafted timber. The outlets were
closed in 1887-88, but the dams were washed away in 1890. The
outlets deplete the channel and make navigation more difficult. The
work remaining to complete the project consists in reclosing the
above-mentioned outlets and the removal of obstructions from Point
Jefferson to Wallace Landing, a distance of about 15 miles. In ordi-
nary seasons a depth of 6 feet or more may usually be expected
between January and June from the mouth to Point Jefferson.
During the remainder of the year the depth is usually reduced to
1 foot. A gage reading at Girard, La., of 3.5 feet or more is favor-
able to light-draft navigation, and 6.5 feet or more is favorable to
heavy-draft navigation. The controlling depth at the end of the
year was 2.2 feet.
Cost of new work under existing project to June 30, 1937----------$30, 000. 00
Cost of maintenance       --------------------------------         103, 736. 88
      Total cost-----------------------------133,                                                                   736. 88
Total expended----------------                    ------------------------                                     133, 736. 88
  Proposed operations.-The balance unexpended $2,350 will be ap-
plied to bank clearing and removing obstructions between the mouth
and Girard, La., during November 1937.
  The additional sum of $2,500 can be profitably expended during
the fiscal year 1939, using Government plant and hired labor, to be
applied to bank clearing and removing obstructions between the
mouth and Girard, La., during October 1938.
                                    Cost and financial summary

Cost of new work to June 30, 1937--------------------------                                                    $30,000.00
Cost of maintenance to June 30, 1937-----------------------                                                    103, 736. 88
        Total cost of permanent work to June 30, 1937------------                                              133, 736. 88

Net total      expenditures                           --                       ---------                    133,
                                                                                                            1    736.88
Unexpended balance June 30, 1937--------------                                                                2, 350. 00

        Total amount appropriated to June 30, 1937_________                                                     36, 086. 88
                                                                                                               1____


       Fiscal year ending June 30                    1933          1934                  1935        1936           1937


Cost of new work----------            ------------          ----------           ------------------------
Cost of maintenance_            -            _       $138. 53   -                   $2, 500.00-
                     .
Total expended- . ------------------------            134. 82          3. 71            2, 500.00
Allotted _---_------------------------
                  _____     ____
                    ____ ____          __        _
                                                      -4.01
                                                     ____
                                                                  2,499. 51
                                                                ____      _        __
                                                                                           148.51
                                                                                            ___
                                                                                                    -$150.00
                                                                                                    ____        .$150
                                                                                                                  __    _
            RIVERS AND HARBORS-VICKSBURG,                                MISS., DISTRICT              843
Balance unexpended July 1, 1936                                      _----   -------             $2, 350. 00
Balance unexpended June 30, 1937--------------------------------                                  2, 350. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    2, 500. 00
  1 Exclusive of available funds.

                      6. BAYOUS D'ARBONNE AND CORNEY, LA.

    Location.-Bayou D'Arbonne is formed by the junction of three
tributaries near Farmerville, La. These streams rise in Claiborne
Parish, La.
    Bayou Corney flows about 76 miles; the middle fork flows about 55
miles, both in a southeasterly direction; and Little D'Arbonne flows
  about 56 miles in an easterly direction. Below the junction Bayou
  D'Arbonne flows 37.7 miles in a southeasterly direction and enters
Ouachita River, 189 miles above the mouth of Black River. (See
Mississippi River Commission map, Alluvial Valley of the Missis-
sippi River.)
    Existing project.-This provides for the improvement of Bayous
D'Arbonne and Corney between the mouth of the former and Cobb
Landing on the latter, a distance of 57 miles, by removing snags,
logs, stumps, and leaning trees obstructing navigation.
    At medium and high stages the channel under improvement in
these streams has an average width of about 125 feet, with minimum
depth of about 8 feet. Floods ordinarily cause fluctuation of stage
of about 20 feet between high and low water. Extreme floods occa-
sionally increase this range about 10 feet.
    The latest approved estimate of cost for new work in Bayou
D'Arbonne, and about 3 miles up Bayou Corney, made in 1883, was
 $15,000; and for the new work in Bayou Corney alone, made in 1887,
 $8,000. The latest approved estimate of cost for maintenance in both
streams, made in 1933, is $2,500 a year until 1935, and biennially
thereafter.
    The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for work in both
streams as far up as Stein Bluff (S. Ex. Doc. No. 69, 48th Cong., 1st
sess.); and the act of July 13, 1892, provided for extending work up
to Cobb Landing (same document and p. 1489, Annual Report for
1887). A map of both streams is published in the Annual Report
for 1913, page 2336.
    Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1896 at a saving of $4,000 under the estimated cost. Cobb
Landing on Bayou Corney, is the head of navigation. In ordinary
seasons a depth of 7 feet or more may be expected from January to
June within the limits of the project. During the remainder of the
year the depth is reduced to about 1 foot. A gage reading of 14
feet or more at Farmerville, La., is favorable to light-draft naviga-
tion, and 17 feet or more is favorable to heavy-draft navigation.
The controlling depth at the end of the fiscal year was 1.7 feet.
Costs and expenditures under the existing project to June 30, 1937,
are as follows:
844             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Cost of new work    -----------------------------------------                                    $19, 000. 0(
Cost of maintenance_____- -- _ -__--_____- __-______37,                                               803. 88
      Total cost- -----. __-------------                                                          56, 803. 88
Total expended--__                                ___-______
                                        __-------------__                                         56, 803.88
  Proposed operations.-The balance unexpended $2,350, will be
applied as needed during the fiscal years 1938 and 1939 to bank clear-
ing and removing obstructions between the mouth and Farmerville,
La.
                                       Cost and financial summary
Cost of new work to June 30, 1937____ _____     -_____---                                        $19, 000.00
Cost of maintenance to June 30, 1937____--  -------------
                                           __--                                                   37, 803. 88

         Total cost, of permanent work to June 30, 1937-- ------                                  56, 803. 88

Net total expenditures --- ___--------56,                                                            803.88
Unexpended balance June 30, 1937---------------------------                                       2, 350. 00

         Total amount appropriated to June 30, 1937                      ___-       ___--59,         153. 88


         Fiscal year ending June 30                 1933       1934      1935           1936          1937

Cost of new work .......------.-------.----------
                                    $207. 78 ......-----------------
Cost ofmaintenance--.....-----....-------------                --- _------
Total expended--.--------.--.--.--.--...---202. 22              $5. 56
Allotted ----            .-------------
                                    -------------    -5.00       -. 75   $210. 63     -$150.00


Balance unexpended July 1, 1936 ------------------------                                          $2, 350. 00
Balance unexpended June 30, 1937_______---______                                                   2, 350. 00

                                        7. YAZOO RIVER, MISS.

   Location.-This river is formed by the junction of Tallahatchie
and Yalobusha Rivers in Leflore County, Miss., flows about 189 miles
in a southerly and southwesterly direction, and enters the Mississippi
River at Vicksburg, Miss. (See Mississippi River Commission map,
Alluvial Valley of the Mississippi River.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1873. Total cost and expenditures under
it prior to adoption of existing project, March 3, 1875, were $39,023.06
for new work.               For further details see page 1871 of Annual Report
for 1915.
  Existing project.-This provides for the removal of snags, wrecks,
sunken logs, overhanging trees, and other obstructions throughout the
entire length of the river, a distance of 189 miles.
   The channel under improvement ha's an average width of about 200
feet and a minimum depth of 4 feet at all stages during the entire
year. Floods ordinarily cause fluctuations of stage of about 35 feet
between high and low water. Extreme floods occasionally increase
this range about 5 feet.
   The latest approved estimate of cost for new work to be finished in
4 years, made in 1874, was $120,000 exclusive of amount expended on
previous project. The latest (1914) approved estimate for annual
cost of maintenance is $16,000.
         RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                   845

   The existing project was adopted by the River and Harbor Act of
March 3, 1875 (p. 364 of Annual Report for 1874). A map of the
stream is published in the Annual Report for 1913, page 2336.
   Terminal facilities.-None.
   Operations and results during fiscal year.-During periods from
September 9 to November 23, 1936, the United States combined dredge
and snagboat Sunflower removed 6,396 cubic yards of material from
the channel at various points below Yazoo City gage and bridge, mile
74.5, to below Greenwood highway bridge, mile 185.0.
   The Sunflower and attendant plant, U. S. quarterboat No. 3501,
removed 120 snags, broke up 5 log jams, removed 10 logs and 1 sunken
barge from the channel, and cleared the bank of 634 trees and 31,135
willows between the mouth of Steele Bayou, mile 9.7 and Greenwood
city front, mile 186.0, a distance of 176.3 miles.
   This work is classed as maintenance and was all done by hired
labor.
Cost of dredging -----------------------------------------                 $5, 645. 61
Cost of snagging and chopping              ------------------------------- 11, 854. 39
      Total cost                   --------------------------------------                          17, 500. 00
Total expended        ------------------------------------   17, 500. 00
   Condition at end of fiscal year.-The existing project was com-
pleted in 1888. The river is navigable throughout its length. In
ordinary seasons the gage at Yazoo City usually reads 12 feet or more
between January and June and depths exceeding 10 feet may be
expected from the mouth to the head of the river. During the re-
mainder of the year this gage frequently reads as low as 4 feet and
depths of 4 feet or more are usually found. The controlling depth
at the end of the fiscal year was 3.5 feet.
Cost of new work under existing project to June 30, 1937---------                                $320, 637. 64
Cost of maintenance    --------------------------------------                                     415, 789.01

      Total cost         -----------------------------------------                                736, 426. 65
Total expended     __------------------------------------------                                   736, 426. 65
  Proposed operations.-An allotment of $16,000 made during July
1937 will be applied to maintenance, using Government plant and
hired labor, as follows:
Maintenance:
   Dredging with U. S. combined dredge and                                snagboat Sunflower
      during October 1937---------------                                 -------------------       $5, 000. 00
    Snagging and chopping with U. S. combined                            dredge and snagboat
      Sunflower during August and September                              1937_________       _     11, 000. 00
           Total for all work---....--                       ----   ----------------------         16, 000. 00
   The additional sum of $16,000 can be profitably expended during the
fiscal year 1939, as follows:
Maintenance:
    Dredging with U. S. combined dredge and snagboat Sunflower
      during October 1938-------_--------------------------$5,                                         000. 00
    Snagging and chopping with U. S. combined dredge and snagboat
      Sunflower during August and September 1938 -----------                                       11, 000. 00
            Total for all work----------                                         -   -    _        16, 000. 00
846            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                       Cost and financial summary

Cost of new work to June 30, 1937--------------------------            $359, 660. 70
Cost of maintenance to June 30, 1937         -------------------------- 415, 789. 01
      Total cost of permanent work to June 30, 1937-------------                                           775, 449. 71
Net total expenditures------------------------------------                                                 775, 449. 71
Total amount appropriated to June 30, 1937 __    --------                                                  775, 449. 71


         Fiscal year ending June 30                   1933           1934            1935          1936            1937

Cost of new work-----------------
Cost of maintenance_-- ----------------- $1, 900.00               $11,007. 33    $14, 908. 45   $21, 506. 97        $17, 500
Total expended_                                     1, 581. 12
                                    ____-----------------------    10, 991. 86    14, 798. 51    21, 685. 03         17, 500
Allotted--------           -------------------- 15, 968. 24        10, 344. 44    10, 000. 00    19,150. 00           7, 500


Balance unexpended July 1, 1936_-----------------------------    $10, 000. 00
Amount allotted from War Department Appropriation Act approved
  May 15, 1936__    --------------------------------------------   7, 500. 00
      Amount to be accounted for---------------------------                                                    17, 500. 00
Gross amount expended_         ------------------------------------                                            17, 500. 00
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------------------------------- ------                                                   16, 000. 00
Balance available for fiscal year 1938------------------- -------                                              16, 000. 00

Amount that can be profitably    expended
                           1- - - - -
                                             in fiscal year ending June
                                       - - - - - - - - - - - - - - - -- - - - - - - - -
30, 1939, for maintenance                                                                                     16, 000. 00
   1 Exclusive of available funds.

                                    8. YALOBUSHA RIVER, MISS.

   Location.-The Yalobusha River rises in Chickasaw County, Miss.,
and flows about 165 miles westerly across north central Mississippi
to a junction with Tallahatchie River, 3 miles above Greenwood,
Miss. (See Mississippi River Commission map, Alluvial Valley of
the Mississippi River.)
   Existing project.-This provides for the removal of leaning timber,
drift, and the most dangerous snags, between Grenada, Miss., and the
mouth, 63 miles.
   At medium and high stages the channel under improvement was
125 to 225 feet wide with depths suitable for 3-foot navigation. The
Yalobusha River is subject to violent fluctuations in stage and to in-
termittent and frequent periods of low flow. Floods ordinarily
cause fluctuations in stage of about 25 feet between high and low
water.
   The estimate of cost for new work made in 1881, was $7,000. No
approved estimate for annual maintenance has been made.
   The existing project was authorized by the River and Harbor Act
of March 3, 1881 (S. Ex. Doc. No. 35, 46th Cong., 2d sess., and p. 1414
of Annual Report for 1881). No map of the stream has been
published.
  Recommended modifications of project.-The project is recom-
mended for abandonment. (H. Doc. No. 467, 69th Cong., 1st sess.)
  Terminal facilities.-None.
               RIVERS AND HARBORS-VICKSBURG,                                             MISS., DISTRICT                 847
  Operations and results during fiscal year.-During the period
September 28 to October 8, 1936, the United States combined dredge
and snagboat Sunflower and attendant quarterboat No. 3501 removed
drift from the channel and brush from the banks at the mouth.
  This work is classed as maintenance and was done by hired labor.
Cost of maintenance------------------------__                                                                      $1, 375. 24
Total expended_ -------------------------                                                                           1, 375. 24
  Condition at end of fscal year.-The existing project was com-
pleted in 1884. Grenada, Miss., 62.9 miles above the mouth, is the
head of navigation.                          In ordinary seasons from January to June the
gage at Grenada may be expected to read 5 feet or more, and depths
exceeding 3 feet are generally found between the mouth and head of
navigation.                During the remainder of the year the stage often falls
to about 2.5 feet and minimum depths of less than 1 foot are frequent.
The controlling depth at the end of the fiscal year was 0.7 foot.
Cost of new work under existing project to June 30, 1937------------ $7, 000. 00
Cost of maintenance-------------------------------------------- 15, 936.38
      Total cost- ------- -----------------------------                                                            22, 936. 38
Total expended------------------------------------------------22,                                                      936. 38
  Proposed operations.-No operations are proposed during the fiscal
years 1938 and 1939.
                                              Cost and fitancial summary
Cost of new work to June 30, 1937------------------------------$7, 000.00
Cost of maintenance to June 30, 1937---------------------------- 15, 936.38
      Total cost of permanent work to June 30, 1937---------------                                                 22, 936. 38
Net total expenditures----------- ------------------------------                                                   22,936. 38
Total amount appropriated to June 30, 1937-----------------------                                                  22,936.38


           Fiscal year ending June 30                            1933         1934         1935          1936          1937


Cost of new work...------------------------------------------------------
Cost of maintenance-------------------                        $8, 159. 35     $795. 22   $1, 606. 57 -----------      $1,375. 24
Total expended------------------                ---------       8, 159. 35     795. 22    1,606. 57 ------------       1, 375. 24
Allotted--------------------------------                       9, 000.00     2,936.38-


Balance unexpended July 1, 1936--------------------------------       $1, 375. 24
Gross amount expended-------------------------------      $1, 456. 29
Less reimbursements collected ---------------------------      81. 05
                                                                       1, 375. 24
                                     9. BIG SUNFLOWER RIVER, MISS.

   Location.-This river has its source in Mud Lake, Coahoma
County, Miss., flows about 240 miles in a southerly direction, and
enters Yazoo River about 44 miles above its mouth. (See Mississippi
River Commission map "Alluvial Valley of the Mississippi River.")
   Previous projects.-The original project was authorized by the
River and Harbor Act of March 3, 1879. The cost and expendi-
tures under this project prior to adoption of existing project, March
2, 1907, were $101,637.44, of which $66,000 was for new work and
           20196-37-pt. 1-54
848      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

$35,637.44 for maintenance. (For further details see p. 1871 of
Annual Report for 1915.)
   Existing project.--This provides for the improvement of the river
from the mouth to Little Callao Landing, a distance of 62.0 miles,
by the closure of outlets, the construction of contraction works, and
the removal of snags, sunken logs, leaning trees, and other obstruc-
tions; and from Little Callao Landing to the mouth of the Hush-
puckena, 109.4 miles, by the construction of a lock and dam at Little
Callao Landing and open-channel work, including dredging and
construction work. The principal features of the lock and dam are
as follows:
  Number : 1.
  Location: Little Callao Landing, Miss.
From nearest town: 17 miles.
Above mouth of river: 62 miles.
Lock: Width of lock chamber, 36 feet; greatest available length for full
width of lock, 160 feet; lift at low water, 16.9 feet; depth on miter sill at low
water, 5.1 feet; gates, wooden miter; character of foundation, piling in sand.
Kind of dam: Movable, Poiree needle.
Type of construction: Concrete.
Completed and opened to navigation 1918.
Actual cost : $402,288.40.
   Operation and maintenance of the lock and dam has been aban-
doned.
   The project proposes to obtain a channel at low water from the
mouth of Big Sunflower River to the mouth of the IHushpuckena, a
distance of 171.4 miles, with an average width of about 100 feet and
a least available depth of 41/2 feet.
   Floods ordinarily cause fluctuations of stage between high and low
water of about 30 feet. Unusual floods occasionally increase this
range about 5 feet.
   Exclusive of amount expended on previous project, the latest ap-
proved estimate of cost for new work for closing outlets, made in
1906, was $75,000; for constructing lock and dam, revised in 1914,
$500,000; and for open-channel work, revised in 1928, $186,700. The
latest (1933) approved estimate for annual cost of maintenance by
removing snags, etc., is $8,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, providing for closing outlets,
constructing contraction works, and removing obstructions from the
mouth to Baird (H. Doc. No. 667, 59th Cong., 1st sess.) ; and the act
of July 25, 1912, provided for construction of lock and dam and
open-channel work above Baird (Rivers and Harbors Committee
Doc. No. 2, 62d Cong., 2d sess.). Operation and care of the lock and
dam was included in the project July 1, 1935, under the provisions
of the Permanent Appropriations Repeal Act approved June 26, 1934.
  The act of August 26, 1937, provided for abandonment of operation
and maintenance of the lock and dam. A map of the stream is
published in the Annual Report for 1913, page 2336.
  Recommended modifications of project.-It is recommended that
this project be curtailed by the elimination of all work between
Pentecost and the mouth of the Hushlpuckena River. (The abandon-
ment of the entire project was erroneously recommended in H. Doc.
No. 467, 69th Cong., 1st sess.)
        RIVERS AND HARBORS--VICKSBURG, MISS., DISTRICT                      849
  Under date of June 28, 1935, the Chief of Engineers recommended
that the existing project be modified to limit channel maintenance
operations to the portion between the mouth and Woodburn, mile 82.7.
  Terminal facilities.-None.
   Operations and results during fiscal year.-No work was done on
channel improvement on Big Sunflower River. During the period
November 23 to December 1, 1936, the U. S. combined dredge and
snagboat Sunflower and attendant quarterboat No. 3501 removed
23,699 willows from the bank of Steele Bayou between the mouth
and a point 4 miles upstream.
  The lock and dam at Little Callao Landing has been operated as
required during the fiscal year and plant, structures and grounds have
been maintained in good condition. The act of August 26, 1937,
provided for abandonment of maintenance and operation of the lock
and dam.
Cost of snagging and chopping-----------------------------           $6, 025. 28
Cost of operating and care of lock and dam---------------------       3, 130. 84

      Total cost of maintenance-----------------------------          9, 156. 12
Total expended    -------------------------------------------         9, 100. 56
   Condition at end of fiscal year.-The outlets were closed under the
existing project in 1909 and the contraction work completed in 1912.
The single lock and dam was completed in 1918 (see table under "Ex-
isting project") at a saving of $97,711 under the estimated cost. The
open channel work above the dam is about 20 percent completed.
The mouth of Hushpuckena River, mile 171.4, is head of navigation.
However, due to the incompletion of the project above Pentecost, mile
124.6, navigation above that point is limited to small craft and rafted
logs. When the river stages are high, usually from January to June,
a minimum depth of 5 feet may be expected below Pentecost, mile
124.6.
   In that part of the river below the dam a gage reading of
feet or more at Holly Bluff, Miss., is favorable to light-draft navi-
                                                                           69.5
gation and 72.5 feet or more is favorable to heavy-draft navigation.
The controlling depth at the end of the fiscal year was 3.2 feet. The
work remaining to be done to complete the project consists of dredg-
ing the channel to a minimum depth of 4.5 feet from Pentecost to
the mouth of Hushpuckena River and depositing the soil along the
banks to contract the width of the river, and the completion of open
channel work above Baird, Miss.
Cost of new work under existing project to June 30, 1937-------- $494, 026. 65
Cost of maintenance     -------------------------------------     246, 759. 29
Cost of operating and care----------------------------------5,         545. 99
      Total cost   ---------------------------------       ------  746,   331.93
Total expended_        -     ________-_____           _________---746,    099. 87
   In addition the sum of $149,010.83 was expended between May 1,
1918, and June 30, 1935, on the operation and care of the works of
improvement under the provision of the permanent indefinite appro-
priation for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year and additional funds allotted during July 1937 will be
applied to maintenance using Government plant and hired labor, as
follows:
850        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Accounts payable June 30, 1937- _                          ----------                                     $227. 95

Maintenance of channel:
   Dredging with U. S. combined dredge and snag boat Sunflower,
      % month during November 1937----___________________----- _2,                                         000. 00
   Snagging and chopping with U. S. combined dredge and snag-
      boat Sunflower, 1  months during November and December
      1937 --                  -------------------------------                                           6, 000.00

        Total for channel maintenance_ -      -___-__________--                                          8, 000. 00
Operating and care of lock and dam-------------------------------                                        5, 000. 00

                         ----------------------------------------
       Total for all work_                                                                             13, 227. 95
  The additional sum of $8,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance of channel:
    Dredging with U. S. combined dredge and snagboat Sunflower
      2/5 month during November 193_8------------------------------- $2, 000
    Snagging and chopping with U. S. combined dredge and snag boat
      Sunflower, 11/2 months during November and December 1938_..     6, 000
            Total ----------------------------------------------------                                       8, 000

                                    Cost and financial summary
Cost of new work to June 30, 1937-----------------------------$560, 026. 6
Cost of maintenance to June 30, 1937L..- ____________________ 1436, 953. 55
      Total cost of permanent work to June 30, 1937 -----------                                     996, 980. 20
Undistributed costs June 30, 1937___-----__-_____________-_                                              -- 4. 11
                                      -------------------------- 996, 976.09
     Net total cost to June 30, 1937________
Minus accounts payable June 30, 1937__ __-__     _______ -227.-___        95
     Net total expenditures-----       __-________________                                         1996, 748. 14
Unexpended balance June 30, 1937-------------___                                         _-__         1, 021. 89
       Total amount appropriated to June 30, 1937______-- _______ 1997, 770. 03

       Fiscal year ending June 30                   1933         1934         1935          1936            1937

Cost of new work---------------     ---------------------------        ------------------------
Cost of maintenance..---w-----
                           .-  -- _    $16, 185. 62 $7,634.46 $2, 808. 54   $2,521.86   $9, 156. 12
Total expended_-------_____--___-----_            15, 330. 27   5,981.37 -17,791.79        2,546. 54        9, 100.56
Allotted__..                          ------
                         ...-------------------    7, 719. 68   7, 529. 81 -18, 713.71     -789. 27-


Balance unexpended July 1, 1936-_---------------------                     $10, 122. 45
Gross amount expended__          -_______-   -         ____ __ $9, 180.66
Less reimbursements collected ------------------------              80. 10
                                                                             9, 100. 56
      Balance unexpended June 30, 1937_   ------------------                                       -1,     021.89
Outstanding liabilities June 30, 1937_ ----------                               __227.                         95
     Balance available June 30, 1937------------------------793.                                                   94
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-----------------------------------------                                         12, 250. 00
       Balance available for fiscal year 1938----------------------                                    13, 043. 94

Amount that can be profitably      expended in fiscal year ending June
30, 1939, for maintenance 2 - - - - -  -
                                                                            8, 000. 00
SIncludes $149,010.83 from permanent indefinite appropriation for operating and care.
2 Exclusive of available funds.
        RIVERS AND HARBORS-VICKSBURG,                MISS., DISTRICT           851

                10. MOUTH OF THE YAZOO RIVER, MISS.
   Location.-See report for Yazoo River, page 844.
   Existing project.-This provides for opening a new outlet for the
Yazoo River through the wrong end of Old River, across a neck of
lowland to Lake Centennial, around the head of De Soto Island,
and down the east arm of Lake Centennial to the Mississippi River
just below the city of Vicksburg. The total length of the proposed
canal is 9.3 miles, with least width of 98.5 feet, and bottom of canal
prism 6.5 feet below zero on the Vicksburg gage.
   The ordinary fluctuation between high and low water is about 44
feet. Extreme floods occasionally increase this range about 15 feet.
   The latest approved, estimate of cost for new work, made in 1893,
was $1,200,000.    The latest (1933) approved estimate for cost of
maintenance is $3,000, biennally, or an average annual cost of $1,500.
   The existing project was adopted by the River and Harbor Act of
July 13, 1892 (H. Ex. Doc. No. 125, 52d Cong., 1st sess.). A map of
the project is published in the Annual Report for 1902, page 1422.
   Terminal facilities.-At Vicksburg, Miss., there is a paved munici-
pal wharf 375 feet in length with inclined ramp exits through sea
wall. This is considered adequate for existing commerce. Addi-
tional data for terminal facilities is also contained in Transportation
Series No. 2, 1929, Transportation in the Mississippi and Ohio
Valleys.
   Operations and results during fiscal year.-During the period Au-
gust 5 to August 18, 1936, the United States combined dredge and
snagboat Sunflower removed 17,346 cubic yards of material from the
channel between the outlet and mile 1.0. This work is classed as
maintenance and was all done by hired labor.
Cost of maintenance----------- ----                             $3, 483. 65
Total expended_------------------------------------------------ 3, 483.65
  Condition at end of fiscal year.-The existing project was com-
pleted in 1904 at a saving of $20,789 under the estimated cost. The
canal is navigable at all times, the minimum depths being generally
about 6 feet greater than the simultaneous readings of the Vicksburg
gage. The controlling depth at the end of the fiscal year was about
28 feet.
Cost of new work under existing project to June 30, 1936------- $1, 179, 210. 87
Cost of maintenance------------------------------------------       105, 493.91

      Total cost                                                      284. 704. 78
                                                                   1-----------------------------------
Total expended----------------------------------------------       1, 284, 704.78
   Proposed operations.-The balance unexpended, $1,516.35 plus an
allotment of $3,500, will be applied to dredging as needed during the
fiscal year 1938.
   The sum of $5,000 can be profitably expended during the fiscal
year 1939 in dredging with United States combined dredge and snag
boat Sunflower, 1 month during July 1938.
                         Cost and financial summary
Cost of new work to June 30, 1937---------------------------      $1, 179, 210. 87
Cost of maintenance to June 30, 1937-----   --------------            105, 493. 91

      Total cost of permanent work to June 30, 1937----------      1, 284, 704. 78
852             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                  Cost and financial summary-Continued
Net total expenditures_.-__- --------------------                                                                          $1, 284, 704. 78
Unexpended balance June 30, 1.937                                                                                                   516. 35
                                                                                                                                 1,---------------------------

           Total amount appropriated to June 30, 1937 --------                                                              1, 286, 221.13

           Fiscal year ending June 30                       1933             1934                 1935               1936             1937

Cost of new work-------..... ------------------                          ---------------------------------------
Cost of maintenance--.---------------- ------------                       $6,000.00            $7, 910.55 ------------               $3, 483. 65
Total expended..........--.....-----------------..... ------------         6,000.00             7,910.5 ------------                  3, 483.65
Allotted------------------------------$3, 000                                 10,000            4624.95 ............
                                                                                                                 ............


Balance unexpended July 1, 1936----------                                            ------------                                $5, 000. 00
Gross amount expended                                    ------------------                 _____                                 3, 483. 65

     Balance unexpended June 30, 1937-----1,------------------                                                                       516. 35
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937_      - -_                                                                                                  3, 500. 00

           Balance available for fiscal year 1938---------------------- 5, 016. 35

Amount that can be profitably expended in fiscal year ending June
                                                  - -- -- --- -- --- -- -
30, 1939, for maintenance 1- - ___
                                  -- -- --- -- --
                                                                                                                                  5, 000. 00
   1
       Exclusive of available funds.

       11. EXAMINATIONS SURVEYS AND CONTINGENCIES                                                                   (GENERAL)
  The cost of the work during the fiscal year was $28,957.95. The
expenditures were $28,230.20. The balance unexpended June 30,
1937, plus additional funds to be provided, will be applied as needed
during the fiscal year 1938 to payment of expenses to be incurred
under this heading. The additional sum of $16,000 can be profitably
expended during the fiscal year 1939.
                        Cost and financial summary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937----      ----------_____ --                                                            _ $98, 519. 00
      Total cost of permanent work to June 30, 1937-------------98, 519. 06
Undistributed costs June 30, 1937_ _ ___---______------_--_         -- 2.03
      Net total cost to June 30, 1937--------------------------                                                                  98. 517. 03
Plus accounts receivable June 30, 1937 .------. __-------___                                                                         596. 52

     Gross total costs to June 30, 19379__-9_____---______--                                                 -         -       99, 113. 55
Minus accounts payable June 30, 1937-         _____--------------                                                                2,306. 84
     Net total expenditures--_________________--_____                                                                            96, 806. 71
Unexpended balance June 30, 1937_______---______ -__                                                                              4, 1+19. 18
          Total amount appropriated to June 30, 1937_______________ 100,925. 89

           Fiscal year ending June 30                       1933            1934                 1935                1936             1937


Cost of new work....-----------------.........................-----------------          ---                 ...--------
Cost of maintenance..----.------------- --               $8, 071. 73     $6, 388. 86           $9, 147. 55       $17, 178. 34      $28, 957. 95
Total expended ..........................                  7, 641. 37      6, 339. 06           8, 516. 78         17, 079. 30      28, 230. 20
Allotted ............. ....................              14, 703. 29      10, 569. 93          11, 000. 00         20, 652. 67       15, 000. 00
                 RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                                              853

Balance unexpended July 1, 1936_----------___ ------------     $17, 349.38
Amount allotted from War Department Appropriation Act approved
May 15, 1936---------    ----------------------------------    15, 000.00

Amount to be accounted for--------------------------------                                                                            32, 349.38
Gross amount expended_     _--      ______-------------                                                           $30,299.95
Less reimbursements collected --      --------------                                                                2, 069. 75
                                                                                                                                      28, 230. 20

      Balance unexpended June 30, 1937----------------------                                                                           4,119.18
Outstanding liabilities June 30, 1937__------------------------                                                                        4,119.18

     Balance available June 30, 1937--       --------------------------
Accounts receivable June 30, 1937-------------------------------                                                                         596. 52
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937______------_1---         _
                                        -----------------                                                                             13,200.00

      Balance available for fiscal year 1938----- --------------                                                                      13, 796. 52
Unobligated balance available June 30, 1937_                                                                                          13, 796. 52
                                                                                                                                      1_______---------

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance -----------------------------------                                                                        16, 000.00
     1 Exclusive of available funds.

12. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                             [Commercial statistics for these projects are given in pt. 2 of reportj

                                                                                           For last   Cost and expenditures to
                                                                                           full re-         June 30, 1937      Estimated
                                 Name of project                                           port see                                     amount
                              Name of project                                              Annual                                      required to
                                                                                           Report     New work         Mainte-          complete
                                                                                            for-                       nance

1. Little River, La.' _------_.___-------------_                                            1890       $2, 500.00 --------------           (2)
2. Bayou Bartholomew, La. and Ark.3 4                                       _-----          1931       45, 873. 53   $42, 857. 25          (2)
3. Saline River, Ark. 4 -----------------------------                                       1931       26, 900. 00    12, 791. 67          (2)
4. Steele and Washington
               3                  Bayous and Lake Washing-
                   - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -   -
     ton, Miss. 4                                                                           1931       19, 049. 81       8, 000. 00        $40, 000
5. Tallahatchie and Coldwater Rivers, Miss- ..-.----.                                       1936       43, 481.48      173, 066. 02        (2)
6. Red River from Fulton, Ark., to mouth of Washita
     River, Okla.a_ --------------------------------                                        1924      378, 573.82      182, 157. 05        (8)


     1 Abandonment recommended in H. Doc. No. 467, 69th Cong., 1st sess.
     2 Completed.
3 Abandonment recommended in H. Does. Nos. 1692, 64th Cong., 2d seass., and 467, 69th Cong., 1st sess.
4 Channels adequate for existing commerce.     Abandonment recommended in H. Does. Nos. 1694, 64th
Cong., 2d sess., and 467, 69th Cong., 1st sess.
     &Curtailment of project recommended in H. Doc. No. 947, 64th Cong., 1st sess.
     * Maintenance only.

             13. PLANT ALLOTMENT FOR VICKSBURG, MISS., DISTRICT

                                                    Cost and financial summary

Undistributed costs June 30, 1937____----------__                                                                 ____          $358, 947. 62
Plus accounts receivable June 30, 1937_ -------------                                                         -       --        - 38, 150.50

      Gross total costs to June 30, 1937 --------------------                                                                     397, 098.12
Minus accounts payable June 30, 1937_---------------------                                                                         37, 970. 04

     Net total expenditures__--___--- -----------------                                                                           359, 128. 08
Unexpended balance June 30, 1937--------------------------                                                                        100, 992. 71

             Total amount appropriated to June 30, 1937--- -----------                                                            460, 120. 79
854          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


        Fiscal year ending June 30                 1933           1934           1935           1936                 1937


Total expended-----------         -----------------
                                            ____           ___   ____       $360, 938.03      $1, 662.05      -$3,     472.00
Allotted------------------------------......--.--...-----------              388, 529. 88     12, 590. 91       59, 000.00



Balance unexpended July 1, 1936                                                                         $38, 520. 71
Amount allotted from War Department Appropriation Act approved
  May 15, 1936---------- -------------------------------                                                    59, 000. 00
      Amount to be accounted for .___.     __                                                               97, 520. 71
Gross amount expended------__   -----
                                  _________                              ___ $316, 512. 29
Less reimbursements collected-_     ___-__                           ____--   319, 984. 29
                                                                                                        -3, 472. 00
      Balance unexpended June 30, 1937        _____        _____                                        100; 992. 71
Outstanding liabilities June 30, 1937 ________ -___    $31,057.52
Amount covered by uncompleted contracts ___--     __- _ 19, 822.08
                                                                                                            50, 879. 60
      Balance available June 30, 1937------------50,                                                            113. 11
Accounts receivable June 30, 1937--------------------                                                       38, 150.50
        Unobligated balance available June 30, 1937                                                         88, 263.61

                   14. RED RIVER BASIN, LA., FLOOD CONTROL

   Location.-The flood-control projects authorized by Congress are
located generally along the Red River in Louisiana between its mouth
and the Arkansas State line. More definite locations are given in the
following paragraph:
  Existting project.-The Flood Control Act approved June 22, 1936,
provides for improvements at the following localities based on the re-
port published in House Document No. 378, Seventy-fourth Congress,
second session, and in accordance with a supplemental report dated
March 7, 1934:

                                                                                               Construc-        Lands
                                                                                                               and dam-
                                                                                               tion costs       ag
                                                                                                                 ages


Red River Parish Levees, La.: Extension and enlargement of existing levees in
  Red River Parish on right bank of Red River below Shreveport-         _             $150, 000                      $30, 000
Bayou Pierre, La.: Enlargement of the Bayou Pierre channel through Bayou Pierre
Lake and from Bayou Wincey to the mouth at ,Grand Ecore; in Red River,
  De Soto, and Natchitoches Parishes_              -- -                                 300, 000
Natchitoches Parish Levees, La.: Construction of levees in Natchitoches Parish
  on right bank of Red River, dam and floodgate at mouth of Cane River, with
  incidental drainage works _. - -..     .__________..               .    .           1315, 000                       40, 000
Saline Point, La.: Excavation of cut-off channel in Avoyelles and Catahoula
  Parishes ....-                                                                        135, 000               .........
Black Bayou, La.: Earth dam on Black Bayou in Caddo Parish to form a flood-
  storage reservoir-...............
                               ________ ___ .       ________
                                                      ___-_____
                                                       .......              -________ 1 125, 000
Bayou Bodcau, La.: Leveed floodway in Bossier Parish for diversion of flood
  waters cf Bodcau and Cypress Bayous _.1,                                              825, 000                      68, 000
Wallace Lake, La.: Earth dam at lower end of Wallace Lake in Caddo Parish to
  form a flood-control reservoir _----------------- -----------------------------       380, 000                      20, 000

      Total.....    ...............--------------------------------------------------------     3,230,000            158,000

  1 Estimate may have to be increased to meet desires of local interests for more complete protection.


  Local cooperation.-See page 6. Progress has been made toward
the fulfillment of these requirements.
             RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                      855
  Local interests desire to substitute other works for the authorized
Bayou Bodcau, La., project.
  Condition at end of fiscal year.-Work has not been started.
  Proposed operatio8ns.-The sum of $795,300 allotted during August
1937, will be applied to new work, as follows:
Saline Point, La.: Excavation of cut-off channel in Avoyelles and Cata-
  houla Parishes, La----------------------------------------        -----                                   $30, 300
Red River Parish levees, La.: Extension and enlargement of existing
  levees in Red River Parish on right bank of Red River below
  Shreveport----------------------------------------------------                                           150, 000
Bayou Pierre, La.: Enlargement of the Bayou Pierre channel through
  Bayou Pierre Lake and from Bayou Wincey to the mouth at Grand
  Ecore, in Red River, De Soto, and Natchitoches Parishes.-------------                                    300, 000
Natchitoches Parish levees, La.: Construction of levees in Natchitoches
  Parish on right bank of Red River; dam and floodgate at mouth of
  Cane River, with incidental drainage works __-         ____-----_                                        315, 000

           Total---------------                        ------------------------------- 795, 300
  The additional sum of $1,236,700 can be profitably expended during
the fiscal year 1939 on new work, as follows:
Wallace Lake, La.: Earth dam at lower end of Wallace Lake in
  Caddo Parish to form a flood-control reservoir________________----                                      $512, 000
Natchitoches Parish levees, La.: Continuation of above work                               --------         620, 000
Saline Point, La.: Completion of cut-off channel__________________                                         104, 700
          Total ----------------------------------------------------                                     1,236,700
                                       Cost and financial summary
Total amount appropriated to June 30, 1937___________________
                                                            --                                      ______--
Amount        (estimated)        required to be appropriated for completion
   of existing project           2-   --------------                                                    $2, 435, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work ---------------------------------------                                          1, 236, 700
  1 Exclusive of $795,300 allotted since June 30, 1937.
  2   Tentative.

               15. OUACHITA RIVER BASIN, LA., FLOOD CONTROL

   Location.-Right bank of Ouachita River at Columbia, La., about
31 miles below Monroe, La., and right bank of Black River at Jones-
ville, La., 56.5 miles above the mouth.
   Existing project.-The existing project was authorized by the Flood
Control Act approved June 22, 1936, and provides for the following
work in accordance with report published in House Document No. 196,
Seventy-third Congress, second session:

                                                                 Flood Control Act             Revised costs
                                                                      1936 costs               Revised costs


                                                                Construc-    Lands and     Construc-      Lands and
                                                                  tion        damages        tion          damages

Columbia, Caldwell Parish, La.: Levees, bulkhead.
and drainage structures.-----------.................            $339, 100     $55, 900     $247, 000         $39, 000
Jonesville, Catahoula Parish, La.: Levee, retaining
wall, and drainage structures--____----------_____......__.      368, 200      74, 800      368, 200         62, 000
       Total.....------------------         -----------------     707,300      130,700       615,200          101,000
856       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Local cooperation.-See page 6. Progress has been made toward
the fulfillment for Columbia, La. Local interests desire a more
comprehensive project for Jonesville, La.
  Condition at end of fiscal year.-Work has not been started.
  Proposed operations.-An anticipated allotment of $192,500 dur-
ing 1937 will be expended during the fiscal year 1938 on new work
at Columbia, La.: Levees, bulkhead and drainage structures.
  An additional sum of $54,500 can be profitably expended during
the fiscal year 1939 for completion of the Columbia, La., levees.
                          Cost and financial summary
Total amount appropriated to June 30, 1937                             $_       -..----
Amount (estimated) required to be appropriated for completion
  of existing project--------.--- -----
                                      __-----                           615, 200.00

                      16. SARDIS RESERVOIR, MISS.

  Location.-The works covered by this project are on Little Talla-
hatchie River about 6 miles southeast of Sardis, Miss.
  Existing project.-This provides for the construction of an earth
dam and reservoir for flood control on Little Tallahatchie and Yazoo
Rivers. The estimate of cost for construction is $8,575,000 and
$1,825,000 for lands and damages.
  The existing project was authorized by the Flood Control Act ap-
proved June 15, 1936 which is based on report published in House
Document No. 198, Seventy-third Congress, second session, and re-
port of Chief of Engineers printed in House Committee on Flood
Control Document No. 1, Seventy-fourth Congress, first session.
  Local cooperation.-Local interests are required to hold and save
the United States free from all damages due to the construction
work, and maintain and operate all the works after completion.
   Assurances given by local interests were accepted by the Chief of
Engineers June 19, 1936, as meeting the requirements for local co-
operation requisite to the project being placed under way.
   Operationsand results during fiscal year.-With the use of regular
funds 22 percent of the abstracts were prepared and 70 percent of
the studies, plans, and designs were completed; by use of hired labor
work in connection with the embankment was started. A contract
for construction of a portion of the dam was awarded June 14, 1937.
   Using emergency construction funds, hired labor cleared 96 percent
of the dam site and borrow pits, grubbed 86 percent of the dam site,
cleared 78 percent of the reservoir area, constructed 99 percent of the
roads and bridges and made 95 percent of the surveys, plans, and
designs.
Cost of new work:
    Regular funds:
         Purchase of right-of-way, including cost of abstracting __-    $36, 480. 59
         Studies, plans, and designs_....   _______      ____-------- 67, 264.07
         Embankment :
             Contract----------------                       $1, 118. 59
             Hired labor     ------------------------       17, 839. 27
                                                                         18, 957. 86

                Total cost---------------------------------- ----       122, 702. 52
      Total expended ----------------------------------------           1ti0, 930. 16
          RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                     857

Cost of new work-Continued.
    Emergency relief funds:
        Hired labor:
            Clearing dam site and borrow pits----------------$140, 582. 95
            Constructing roads and bridges------------------196,117. 85
            Grubbing dam site--         --------------- -----------   99,735.95
            Clearing reservoir area--------------------------         53, 295. 70
        Surveys, plans, and designs         ____-------------------- 170,993.35

          Total cost---------------                  ----------------------- 660, 725. 80
    Total expended                                                                       90
                                                                             6--------------------------------
  Coruition at end of fiscal year.-(See paragraph Operations and
results during fiscal year.) The existing project as a whole is 5.5
percent completed.
  Cost of new work under the existing project to June 30; 1937, was
$122,702.52, regular funds, and $660,725.80, Emergency Relief funds
a total of $783,428.32. The total expenditure was $802,015.06, of
which $160,930.16 were regular funds and $641,114.90 Emergency
Relief funds.
  Proposed operations-Regular funds.-The balance unexpended
plus accounts receivable at the end of the fiscal year, and additional
funds to be provided, will be applied, as follows:
New work:
   Land purchase-------------------                     ------------------ $2, 100,000
   Main dam and dikes----------------------                                 1, 620, 000
   Outlet works ---------------------------------------                     1, 000, 000
   Spillway-------------------                ---------------------------      567, 000
   Clearing reservoir--------------------------------------                    313,000

       Total for all work____________--__-------------------___                      5, 600, 000
  Emergency relief funds.-The sum of $75,000, unexpended balance
from $900,000 allotted from the Emergency Relief Appropriation
Act of 1935 will be applied to clearing the reservoir.
   The additional sum of $3,500,000 can be profitably expended dur-
ing the fiscal year 1939, as follows:
New work:
   Main dam and dikes__________-------------------------------         $741, 000
   Slope protection----------------------------------------480,               000
   Outlet works------------------   ----------------------        ---    560, 000
   Spillway                         -------------------    _ _ __     1, 406, 000
   Clearing reservoir-----------------------------------        ---- 313, 000
       Total for all work----------------------------------                         3, 500,000

                               Cost and financial summary
                         MAINTENANCE AND        IMPROVEMENT     FUNDS

Cost of new work to June 30, 1937------------------_                              $122, 702. 52
Cost of maintenance to June 30, 1937___________________________
      Total cost of permanent work to June 30, 1937-------- ---                    122, 702.52
Undistributed costs June 30, 1937_-          ----------
                                               _--_                                 98, 923.03
      Net total cost to June 30, 1937______-_____________                          221, 625. 55
Plus accounts receivable June 30, 1937 ______           _____-__--2,                    430. 55
      Gross total costs to June 30, 1937 .          .________----------            224, 056. 10
Minus accounts payable June 30, 1937                                                 3, 125. 94
                                                                                    6------------------------
     Net total expenditures -  _    ----------                                  - 160, 930. 16
Unexpended balance June 30, 1937_ __-----------                                 2,300, 069. 84
     Total amount appropriated to June 30, 1937_ -----------                    2, 461, 000. 00
858               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


            Fiscal year ending June 30                                 1933                 1934                  1935              1936                 1937

Cost of new work ........--
                         ------------
                            -         ------------                             -----------------------                          ----------        $122, 702. 52
Cost of maintenance ......
Total expended---------------------------...........................                  ...     .......----------------------      ......... ..
                                                                                                                                ------------           160, 930. 16
Allotted.....------------------------------                                       ------------------------ $2, 500, 000                           -39,000.00


Balance unexpended July 1, 1936 ___-----______                                                                          __ -       -$2,        500, 000.00
                                                                                                                                                39
Deductions on account of revocation of allotment                                                                                                   , 000.00
                                                                                                                                              - *---.-.-----

      Net am'ount to be accounted for-----------------------                                                                                 2, 461, 000. 00
Gross amount expended-----------------------        $203, 556. 88
Less reimbursements collected ----   __-   ____-__-   42, 626.72
                                                                                                                                               160, 930. 16

      Balance unexpended June 30, 1937-------- ------------                                                                                  2, 300, 069. 84
Outstanding liabilities June 30, 1937 __ __--- $1, 886, 213. 40
Amount covered by uncompleted contracts--____-      217, 000. 00
                                                                                                                                             2, 103, 213. 40

Balance available June 30, 1937_ ------------------                                                                                            196, 856. 44
Accounts receivable June 30, 1937       -----------------------                                                                                  2, 430. 55

            Unobligated balance available June 30, 1937--------------                                                                          199, 286. 99

Amount (estimated) required to be appropriated for completion of
existing project----------------------------------------                                                                                        ()
Amount that can be profitably expended in fiscal year ending June
30, 1939          -----------------------------------------                                                                                     (--
1 Part of Mississippi River flood control project.
                                                     EMERGENCY                IRELIEF FUNDS

Cost of new work to June 30, 1937________________________                                                                                     $660, 725. 80
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937---- -----                                                                           __     660, 725. 80
Undistributed costs June 30, 1937---------------------------                                                                                   -7, 821.10

      Net total cost to June 30, 1937 ------------    -------------                                                                            652, 904. 70
Plus accounts receivable June 30, 1937-.------
                                        _..     -----                                                                               ___          2, 404. 93

      Gross total costs to June 30, 1937 -----------     ------                                                                                655, 309. 63
Minus accounts payable June 30, 197_-----------__--------------                                                                                 14, 194. 73

     Net total expenditures   -- __-____-______________- -641, 114. 90
Unexpended balance June 30, 1937 ......-                    108, 885. 10
            Total amount appropriated to June 30, 1937                                                  --------------                         750, 000. 00

    Fiscal year ending June 30                          1933                   1934                     1935                     1936                  1937


Cost of new work---            _
                              ----------------------------     -------------- -------------- $660, 725. 80
C ost of m aintenance- ... ... ... .. ... ... .. ... ... ... .. ... ... .. ... ... ... .. ... .. ..----- -
Total expended------.....             --------------
                                    ___      _       --------------                          --------------                   -------------           641, 114. 90
Allotted------......--.......--------......------------------------------------------...                                         $900, 000       -150,000.00
               RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                                         859
Balance unexpended July 1, 1936______---------------           $900, 000.00
Deductions on account of revocation of allotment--------------150, 000. 00

      Net amount to be accounted for _____---------------                                                                   750, 000. 00
Gross amount expended-________------                 $697, 484.00
Less-
    Reimbursements collected___--    -  $56, 215.90
    Receipts from sales -- ____--__--        153. 20
                                                       56, 369. 10
                                                                                                                            641, 114. 90
Balance unexpended June 30, 1937___          ___--
                                          --------------                                                                    108, 885. 10
Outstanding liabilities June 30, 1937___----------------                                                                    108, 885. 10

Balance available June 30, 1937                                -___---------------                                         ----------
Accounts receivable June 30, 1937_____-- ______----------                                                                     2, 404.93
Unobligated balance available June 30, 1937_____------                                              --------                  2,404.93
       CONSOLIDATED              COST AND FINANCIAL SUMMARY FOR SARDIS RESERVOIR,                                            MISS.

Cost of new work to June 30, 1937    ____________                                                                          $783, 428. 32
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937__   ______-                                                             783, 428. 32
Undistributed costs June 30, 1937__ ________________91,                                                                          101. 93

      Net total cost to June 30, 1937________-______--___                                                                   874, 530. 25
Plus accounts receivable June 30, 1937______________________                                                                  4, 835. 48

     Gross total costs to June 30, 1937------_------------                                                                  879, 365. 73
Minus accounts payable June 30. 1937___                                                                                          320. 67
                                                                                                                             7__--------------77,
     Net total expenditures___________-_________-______                                                                   802,045.06
Unexpended balance June 30, 1937 --   --------------------                                                             2, 408,954.94
            Total amount appropriated to June 30, 1937__--                                          _____----3,211, 000. 00

           Fiscal year ending June 30                         1933              1934            1935                1936         1937

Cost of new work------............--------......---   ...------------------                    -------- ------------ $783,428.32
Cost of m aintenance ... . .---....                      I-........... I.                                            ..........
Total expended...............-------------------------            ..........--
                                                              ---------------------.....                     ------------ 802,045.06
Allotted------.----------------------.------------                            .------------ .---------
                                                                                                     $3, 400, 000 -189, 0O. 00


Balance unexpended July 1, 1936 --------------------                                                                  $3, 400, 000.00
Deductions on account of revocation of allotment---__.                                                 --.                189, 000. 00
      Net amount to be accounted for ----------------------                                                            3, 211, 000. 00
Gross amount expended_-- --------------------          _ $901,040.88
Less:
    Reimbursements collected_------           $98, 842.62
    Receipts from sales -------           -___- -153. 20
                                                            98, 995. 82
                                                                                                                            802, 045. 06
      Balance unexpended June 30, 1937_            ------  __                                                          2, 408, 954.94
Outstanding liabilities June 30, 1937------------$1, 995, 098. 50
Amount covered by uncompleted contracts-------       217, 000. 00
                                                                                                                       2, 212, 098. 50
     Balance available June 30, 1937-------                                                    -       - -                  196, 856. 44
Accounts receivable June 30, 1937 ------                                                   ------         _                   4, 835. 48
           Unobligated balance available June 30, 1937---- ..---                                             --..           201. 691.92
860      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

            17. BIG BLACK RIVER, MISS., FLOOD CONTROL

   Location.-The works covered by this project are on Big Black
River, Miss., which flows into the Mississippi River about 25 miles
below Vicksburg, Miss.
   Existing project.-This provides for improvement of flood channel
by means of channel clearing and suitable cut-offs, from a point be-
tween Carroll and Webster Counties, Miss., to the mouth, a distance
of 260 miles, to lessen the frequency and duration of floods on
180,900 acres of bottom lands. The estimated cost of construction
is $850,000.
   The existing project was authorized by the Flood Control Act of
June 22, 1936.
   Local cooperation.-See page 6. Progress has been made toward
the fulfillment of these requirements.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operations.-The sum of $850,000 allotted during 1937
will be applied to completion of the project.
                           RELIEF PROJECTS
                      18. DENISON RESERVOIR, TEX.

  Location.-The works covered by this project are on Red River
near Denison, Tex.
  Existing project.-This provides for surveys, studies, and reports
for a dam and reservoir to determine useful flood-control operations
with economical development of hydroelectric power. The estimated
cost is $450,000.
  The existing project was authorized by section 7 of the Flood
Control Act of June 22, 1936.
  Local cooperation.-None required.
  Operations and results during fiscal year.-With the use of emer-
gency construction funds the work under the existing project was
completed.
Cost of new work---------------------------------------$373, 547. 70
Total expenditure ------------------------------------    388, 207. 45
  Condition at end of fiscal year.-The existing project was com-
pleted in April 1937 at a saving of $15,091 under the estimated cost.
Total cost of new work to June 30, 1937---------------------     $430, 555. 76
Total expended.--    --------------------------------------       424, 893. 60
Proposed operations.-The project was completed June 30, 1937.
No operations are proposed for fiscal years 1938 and 1939.
                          Cost and financial summary
Cost of new work to June 30, 1937--------------------------      $430,555. 76
Cost of maintenance to June 30, 1937---------------------        -----------

      Total cost of permanent work to June 30, 1937-----------    430, 555. 76
Undistributed costs June 30, 1937                                 -3, 513. 92
      Net total cost to June 30, 1937__                           427, 041. 84
Plus accounts receivable June 30, 1937-- .--------      ---             91. 62
      Gross total costs to June 30, 1937 ------------             427, 133. 46
          RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                          861

Minus accounts payable June 30, 1937 __________----------$2,239.                                                      86
     Net total expenditures__---______-__-_ __-___                                                   424, 893. 60
Unexpended balance June 30, 1937- -----------------------                                             25, 106. 40
        Total amount appropriated to June 30, 1937--------------450,                                          000. 00


        Fiscal year ending June 30             1933              1934            1935       1936               1937

Cost of new work -------------------------
                  ....                                ------------           ----------- $57,
                                                                               ...........      008. 06     $373, 547. 70
Cost ofmaintenance .....
Totaleexpended---          ...           ------------------------ .----------. 36, 686. 06
                                        ..----------------                                                   388, 207. 54
Allotted-.-----------------------.----------.----------------------                      450,000. 00-


Balance unexpended July 1, 1936_ -___________------------$413,           313.94
Gross amount expended __-__---______             ____ $405, 423.96
Less:
      Reimbursements collected ---------  $17, 173. 82
      Receipts from sales _____________-_       42. 60
                                                        17, 216. 42
                                                                    388, 207. 54
      Balance unexpended June 30, 1937                         --------------------                    25, 106. 40
Outstanding liabilities June 30, 1937 ----                     __--- __-----------                   -10, 106. 40
     Balance available June 30, 1937_______---------- ----                                                15, 000. 00
Accounts receivable June 30, 1937 _______________-----91.                                                          62

         Unobligated balance available June 30, 1937 __----____--_                                        15, 091. 62

                                 19. COLFAX CUT-OFF, LA.

   Location.-The work covered by this relief project is on the right
bank of Red River opposite the town of Colfax, La.
   Existing project.-This provides for the excavation of a pilot
channel across the point opposite Colfax, La., to prevent further bank
caving in front of the town. The estimated cost of construction
was $200,000.
   No work was authorized by Congress. The existing project was
authorized under the provisions of the Emergency Relief Appropria-
tion Act of April 8, 1935.
   Local cooperation.-Local interests required to provide all rights-
of-way, to assume liability for any damage resulting from the project,
and to maintain the project after completion.
   Condition at end of fiscal year.-The project was completed June
30, 1936, removing 633,355 cubic yards from the pilot channel at a
total cost and expenditure of $155,000.
   Proposed operations.-None. No further reports will be submitted.
                                     Cost and financial summary

Cost of new work to June 30, 1937___   ___                             __        -_____________$155, 000. 00
Cost of maintenance to June 30, 1937__....._

       Total cost of permanent work to June 30, 1937 __------                                   __        155, 000. 00
Net total expenditures_---------------__ __________                                                      155, 000. 00
Total amount appropriated to June 30, 1937-.                           --------                          155, 000. 00
862             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


           Fiscal year ending June 30                             1933         1934              1935        1936         1937

Cost of new work-----------------     ------------ --------- -------..
                 .......................                               ---.... $155,000.00 -----------
Cost of maintenance-- -- -------      ------------------------------------------------------------
                                                    ..-----------
Total expended----....--....-----------..................------------                       ----------- 148,282. 47      $6, 717. 53
Allotted---              ----------------------.------------                   ..----------------------   155,000. 00.


Balance unexpended July 1, 1936 ----------------------------- $6,717. 53
Gross amount expended-------------------------------------6, 717. 53
                          20. LONG PRAIRIE DISTRICT LEVEES, ARK.

   Location.-The work covered by this relief project is on the left
bank of Red River in Lafayette County, Ark., 6 miles north of
Springbank, Ark.
   Existing project.-This provides for raising the grade and
strengthening about 4 miles of levee of the Long Prairie levee dis-
trict. The estimated cost of construction was $22,000.
   No work was authorized by Congress. The existing project was
authorized under the provisions of the Emergency Relief Appro-
priation Act of April 8, 1935
   Local cooperation.--Local interests were required to furnish right-
of-way, assume all damages resulting from the project, and maintain
the project after completion.
   Condition at end of fiscal year.-The project was completed June
30, 1936, placing 52,346 cubic yards in the levee at a cost and ex-
penditure of $19,000.
   Proposed operations.-None. No further reports will be sub-
mitted.
                                              Cost and financial summary

Cost of new work to June 30, 1937------------------------- $19, 000. 00
Cost of maintenance-
      Total cost of permanent work to June 30, 1937------------19, 000. 00
Net total expenditures----     -------------------------------- 19, 000. 00
Total amount appropriated to June 30, 1937--------------------  19, 000. 00


          Fiscal year ending June 30                              1933         1934             1935         1936        1937

Cost ofnew work....--------------------------- ---------------------------- $19, 000.00    .-------
Cost of maintenance-- - .--------.--..--.-            - ------------------------------ -----------
Total expended           ---------------------------------------------------                              18, 614. 64     $385. 36
Allotted.............---------------------                 ----------------------------------             19, 000. 00........


Balance unexpended July 1, 1936---------- --------------          $385. 36
Gross amount expended-------------------------------$403.16
Less reimbursements collected                             7. 80
                                                         1----------------------------
                                                                                                                         385. 36
                                     21. GRANT PARISH LEVEES, LA.
  Location.-The work                              covered by this relief project extends from
the hills 6 miles north                          of Colfax, La., on left bank of Red River,
Grant Parish, La., past                          Colfax, La., to Pineville, La., river mile 122;
in all about 31 miles of                         levee.
              RIVERS AND HARBORS-VICKSBURG, MISS., DISTRICT                                                       863
   Existing project.-This provides for the construction of levees for
the protection of valley lands on the left bank of Red River. The
estimated cost of construction was $196,000.
   No work was authorized by Congress. The existing project was
authorized under the provisions of the Emergency Relief Appropria-
tion Act of April 8, 1935.
   Local cooperation.-Local interests were required to provide right-
of-way, assume liability for damage resulting from the project, and
to maintain the project after completion.
   Condition at end of fiscal year.-The project was completed August
15, 1936, with 837,275 cubic yards of material placed in the levee, at a
total cost and expenditure of $181,000.
   Proposedoperations.--None. No further reports will be submitted.
                                        Cost and financial summary

Cost of new work to June 30, 1937_-------------------------                                     -      $181, 000. 00
Cost of maintenance to June 30, 1937                                                                __--        ----

      Total cost of permanent work to June 30, 1937--------------                                       181, 000. 00
Total amount appropriated to June 30, 1937____________ _________                                        181, 000. 00


           Fiscal year ending June 30              1933              1934        1935           1936            1937

Cost of new work_______________ _---..__                   __----------
                                                             .          _.     .....        $180, 348. 26        $651. 74
Cost of maintenance-- .    -------              --------     -----------     ----------------
                                                                                     -
Total expended-____-__      --
                           _____-_-------__--                  - -           _              153, 989. 31       27, 010. 69
Allotted         -------------------------------------------------------                    181,000. 00


Balance unexpended July 1, 1936 -----------                                                        $27, 010. 69
                                                                                            _--_---_-
Gross amount expended_--_                   -                                      $27, 013. 52
Less reimbursements collected_       ------                                               2. 83
                                                                                                            27, 010. 69

                                  22. FIRE POINT CUT-OFF, LA.

   Location.-The work covered by this relief project is on the left
bank of Red River 16 miles north of Shreveport, La.
   Existing project.-This provides for the excavation of a pilot chan-
nel across Fire Point to relieve caving banks, thus eliminating exten-
sive levee set-back. The estimated cost of construction was $125,000.
   No work was authorized by Congress. The existing project was
authorized under the provisions of the Emergency Relief Appropria-
tion Act of April 8, 1935.
   Local cooperation.-Local interests required to furnish all rights-
of-way, assume liability for any damage resulting from the project,
and to maintain the project after completion.
   Condition at end of fiscal year.-The project was completed June
30, 1936, removing 416,013 cubic yards from the pilot channel at a
total cost and expenditure of $124,925.78.
   Proposed operations.-None. No further reports will be sub-
mitted.


           20196-37-pt. 1--55
 864           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                          Cost and financial summary

Cost of new work to June 30, 1937_____--____                                         -    __        ___      ___            $124, 925. 78
Cost of maintenance to Junne 30, 1937___

      Total cost of permanent work to June 30, 1937 _____----- -                                                                124, 925. 78
Total amount appropriated to June 30, 1937 -___ ___     ______-                                                                 124, 925. 78


          Fiscal year ending June 30                           1933              1934                1935             1936           1937

Cost of new work.........-----------------------              ---------------------                                124, 925. 78
Cost of maintenance ...................--........................................
Total expended------..........-----------------------                      ----------- ----------                  124. 177. 99       $747. 79
Allotted---------------------------                                 ------------------------------                 125, 000. 00       -74. 22


Balance unexpended July 1, 1936_____ ______________--                                                      --           -___-      $822. 01
Deductions on account of revocation of allotment----
                                                .                                                      ---------                     74. 22

      Net amount to be accounted for -------------------------                                                                      747. 79
Gross amount expended____________________________--                                                         $765. 59
Less reimbursements collected .---      __--------                                                            17. 80
                                                                                                                                    747. 79

Status of reports called for by river and harbor acts and committee resolutions

                                                                      Date trans-
         Locality              Authorization act                       mitted to           Document number                         tionda-
                                                                       Congress

Cossatot River, Sevier       Flood Control Act,
  County, Ark. (prelim-       May 6, 1936.
inary examination for
flood control).
Felsenthal Canal, Ark.       Senate committee res-                  Jan.     7,1937       Senate committee                   Favorable.
  (Ouachita River).            olution, June 17,                                           print, 75th Cong.,
                               1936.                                                       1stsess.
Jefferson-Shreveport         River and Harbor                                              1st sa.
  Waterway, Tex., and          Act, Aug. 30, 1935.
  La., enlarging existing
  project and establish-
  ing reservoir on Cy-
  press River.
Jefferson-Shreveport         River and Harbor
  Waterway, Tex. and           Act, Aug. 26, 1937.
  La., thence via Red
  River to Mississippi
  River, including reser-
  voirs in Cypress and
  Black Cypress Rivers.
Little Missouri River,       Flood Control Act,
  Pike County, Ark.            May 6, 1936.
  (preliminary examina-
  tion for flood control).
Little River, Ark. (pre-        do.................---------------------
                             -....
  liminary examination
  for flood control).
Ouachita River to Hut-       River and Harbor
  tig, Ark., canal.            Act, Aug. 26, 1937.
Red River, Ark. (pre-        Flood Control Act,
  liminary examination         May 6, 1936.
  for flood control).
Red River, Okla., flood      Flood Control Comn-                                                 .............
  control in the Washita       mittee resolution,                                                        ..
  Valley.                      Apr. 14, 1937.
            RIVERS AND HARBORS--MEMPHIS,                     TENN., DISTRICT              865
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
           MEMPHIS, TENN., DISTRICT
  This district includes the Arkansas, White, and St. Francis Rivers
and their tributaries in the northern half of the State of Arkansas,
the northeast portion of Oklahoma, the southeast portion of Kansas,
and the southern portion of Missouri; and the rivers in the western
part of the State of Tennessee that flow into the Mississippi River.
  District engineer: Col. Eugene Reybold, Corps of Engineers.
  Division engineer: Brig. Gen. Harley B. Ferguson, Corps of
Engineers.
                                          IMPROVEMENTS

                                            Page                                          Page
1. Arkansas       River,     Ark.   and             9. Plant allotment------------        886
    Okla_-- --------- _              _      865        FLOOD CONTROL PROJECTS
 . White River, Ark-----------d
                           M       868             10. Arkansas River, Ark. and
4. Current River, Ark. and Mo--    874                   Okla., emergency       relief
4. Current River, Ark. and Mo__    874                   flood control------------         886
5. St. Francis and L'Anguille                      11. Mississippi River Basin, Tip-
      Rivers and Blackfish Bayou,                        tonville to Obion River,
      Ark---------------------     876                   Tenn. (flood control)-----_       888
6. Upper White River, Ark .-----. 879              12. Memphis, Tenn., flood control.      888.
7. Wolf River (Memphis Har-                        13. Arkansas River Basin (flood
      bor), Tenn--_------          881                   control) ----------------         888
8. Examinations, surveys, and                      14. White River Basin (flood
      contingencies (general)_.... 885                   control)-    -           .-- -    891

                       1. ARKANSAS RIVER, ARK. AND OKLA.

   Location.-This river rises in central Colorado and flows 1,460
miles in a southeasterly direction to the Mississippi River, 37 miles
above Arkansas City, Ark. (See Mississippi River Commission allu-
vial valley map, scale 1: 62,500 and scale 1: 500,000 for river from
mouth to vicinity Pine Bluff, Ark., and U. S. Geological Survey State
maps, scale 1: 500,000.)
   Previous projects.--Adopted by the River and Harbor Acts of July
3, 1832, August 14, 1876, March 3, 1879, June 14, 1880 July 5, 1884,
August 5, 1886, and August 11, 1888. The cost and expenditures
under these projects prior to June 30, 1902, were as follows:
For new work: Construction of permanent works --------
                                                     __       -.                 $903, 311.93
For maintenance:
    Maintenance of permanent works ______------    $315, 817. 40
    Operating snag boats ---- _______________ 1, 031,654. 13
                                                                                1, 347, 471. 53
        Total expended on previous projects-----
                                           __ __             -- -__________
                                                                          2, 250, 783. 46
  For further details see page 1872, Annual Report for 1915.
  E xsting project.-This provides for improving the river from its
mouth to Neosho (Grand) River (465 miles) by snagging and dredg-
ing operations, by contraction works and revetments, and by a levee
near Pine Bluff, Ark. (117 miles above the mouth). The dimensions
of the channel are not specified. The several types of structures used
in the improvement are shown in the Annual Report of the Chief
of Engineers for 1902, page 1576. The ordinary freshet fluctuation
is about 16 feet throughout the portion of the river covered by the
project. The extreme stage fluctuation is 60 feet at the mouth of the
.866       REPORT OF CHIEF OF ENGINEERS,                     I. S. ARMY, 1937

river, 37 feet at Little Rock, and 33 feet at Neosho (Grand) River.
As the project is indefinite, no estimate of the cost of completion has
been made. The latest (1928) approved estimate for annual cost of
maintenance is $40,000.
    The existing project results from the combination of prior projects
by the River and Harbor Act of June 13, 1902. To this the River
and Harbor Act of March 2, 1907, added a levee near Pine Bluff to
prevent a cut-off (H. Doc. No. 71, 61st Cong., 1st sess.). Index to
:published maps of sections of the river is given on page 1171, Annual
Report of the Chief of Engineers for 1921.
   Terminal facilities.-Other than a paved bank slope at Little Rock
and private-owned log slips at saw and stave mills at Little Rock,
and sand derricks and elevators at Little Rock and Pine Bluff, there
are no terminal facilities. Those mentioned are adequate for existing
commerce.
    Operationsand results during fiscal year.-All operations were for
maintenance. The snagging operations were by hired labor with
Government plant. Repairs to revetment at Pine Bluff were made by
contract. In snagging operations during the periods July 1 to 9,
October 20 to December 17, 1936, and June 17 to 30, 1937, the snag boat
Arkansas operating over the river below Yill Bend (120 miles above
the mouth of the river and 3 miles above Pine Bluff) removed 682
snags and 5 stumps from the channel and felled 1,610 trees on cav-
ing banks. Repairs to revetment at Pine Bluff from October to De-
cember 1936 consisted of constructing 2 channel mattresses and 3
pocket mattresses, a total of 1,290 linear feet and 1,806 squares, be-
tween Pennsylvania and Idaho Streets. The channel mattresses were
140 feet wide. Approximately 830 feet of bank was graded and
riprapped. The costs for maintenance during the year were:
Snagging operations--------------------------------------------                 $15, 394. 61
Revetment at Pine Bluff----------------------------------------                  35, 013. 48
       Total----------------------------------------------------                 50, 408. 09
   The expenditures during the year were:
Snagging operations--------                -------------------------------      $15, 659. 97
Revetment at Pine Bluff -----------------------------                     ---    35, 013. 48

        Total-------------------------------------------------                   50, 673. 45
   Condition at end of fiscal year.-The construction of permanent
works for general improvement of the river was suspended in 1902,
and completion of the project is not contemplated. Of the works
erected prior to 1902, only those in a short reach of river immediately
above Little Rock and the bank revetment at Pine Bluff remain
effective. The new works of permanent nature since then were for
protecting a levee against caving bank and for preventing a cut-off.
Snagging operations are the activities now relied upon to benefit navi-
gation. They render it easier and safer, but because of additional
obstructions brought into the river by caving banks and shifting
channels these must be repeated continually.
   Under average conditions 4-foot draft can be taken to Little Rock
from the middle of February to the middle of July. From the mid-
dle of August to the middle of December the draft is generally
limited to about 2 feet. During this fiscal year, stages suitable for
navigation by boats of 4-foot draft obtained during the periods Octo-
          RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT                                     867
ber 1-7, October 11-22, October 27-November 1, November 7-11, Jan-
uary 1-February 17, March 30-April 2, April 25-30, May 4-8, and
June 4-25. The total costs under the existing project to the end of
the fiscal year were:
For new work:
    Construction of revetment in Trusty Bend------------------                   $60, 000. 00
    Construction of levee opposite Pine Bluff---------------                      55, 200. 00

                                                                                 115, 200. 00
For maintenance:
    Operating snagboats---------------------------------          --.--          829, 441. 83
    Maintenance of original permanent works, excepting those at
     Pine Bluff__-----------------------_ _ -----------------------               18, 771. 73
    Maintenance of works at Pine Bluff:
        Levee-------------------------                     $18, 148. 97
        Revetment--------------------------------          456, 065. 72
                                                                                 474, 214. 69
    Bank protection at Little Rock         ---------------------                  35, 559. 00
    Hydraulic dredging                                                              7, 744. 15
                                                                                 6--------------------------------

      Total cost of maintenance---------------------------                    2, 025, 731. 40

      Grand total to June 30, 1937---------------------------                 2, 140, 931.40
   The total expenditures under the existing project to the end of the
fiscal year were $2,140,957.70.
   Proposed operations.-Of the balance unexpended at the end of the
year, $12,094.78, $5,000 was revoked on July 1, 1937. The remaining
balance of $7,094.78, together with $19,000 allotted from the War
Department Appropriation Act of July 19, 1937, a total of $26,094.78,
will be expended for maintenance of channel by snagging operations,
using Government plant and hired labor, as follows:
Accounts payable June 30, 1937----------------------------------    $3, 145. 62
Snagging operations between mouth and 3 miles above Pine Bluff,
  Ark., about 5 months with Government snagboat and hired labor, in
                                                   _
  period July to December 1937_---------------------------- ___  _ 22, 949. 16

       Total for all work_----------------------------------------                 26, 094.78
  The additional sum of $24,500 can be profitably expended during
the fiscal year 1939, to be applied to snagging operations between the
mouth and 3 miles above Pine Bluff, Ark., using Government snag-
boat and hired labor, about 5 months during the period July to
December 1938.
                            Cost and financial summary
'Cost of new work to June 30, 1937-- ------------------------                 $1, 018, 511.93
Cost of maintenance to June 30, 1937--------------------__                    3, 373, 202. 93
       Total cost of permanent work to June 30, 1937         _       _         4, 391, 714. 86
Undistributed costs June 30, 1937-----------------------------                          583.58.
      Net total cost to June 30, 1937--------------------------                4, 392, 298. 44
Plus accounts receivable June 30, 1937_____________-________                           730. 28.
     Gross total costs to June 30, 1937------------------------                4, 393, 028. 72
Minus accounts payable June 30, 1937                                                 , 287. 56
                                                                                    1-------------------------
     Net total expenditures_------------------------------                     4, 391, 741. 16
Unexpended balance June 30, 1937 ...--            ------ -               --        12, 094. 78

       Total amount appropriated to June 30, 1937----            -       -     4, 403, 835. 94
868           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30                   1933                1934             1935              1936         1937

Cost of new work_..      -   -   - -     -  -       -
Cost of maintenance-----.---------------- $10, 324.05
                                                                  -        --
                                                                  $45, 634. 50          $33, 866.08
                                                                                                       _$18,625.70
                                                                                                         865.0          $50, 408. 09
Total expended...........--------------------       10, 473. 77       44, 856.48         24, 459. 31    18, 059.08       50, 673.45
             -------------------------
Allotted.......                                     21, 910. 68       62, 089. 96        11, 342. 20    22, 500. 00      40, 100. 00



Balance unexpended July 1, 1936-----------------------------                                                         $22, 668.23
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936------------ --- ------------------------                                                         50, 100.00
     Amount to be accounted for-----------------------------                                                          72, 768. 23
Deductions on account of revocation of allotment- -------------                                                       10, 000.00
      Net amount to be accounted for------                                                                            62, 768. 23
Gross amount expended-------------------------- $62,930. 35
Less receipts from sales--------------------------- 12, 256. 90
                                                                                                                      50, 673.45
      Balance unexpended June 30, 1937------------ ------                                                             12, 094. 78
Outstanding liabilities June 30, 1937--------------. $1, 287. 56
Amount covered by uncompleted contracts                , 858. 06
                                                      1----------
                                                                                                                       3, 145. 62

     Balance available June 30, 1937-------------------                                                                8, 949. 16
Accounts receivable June 30, 1937------------------------------                                                           730. 28

     Unobligated balance available June 30, 1937-------------                                                          9, 679. 44
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------                                                          19, 000. 00
         Balance available for fiscal year 1938 1-------------------                                                  28, 679. 44

Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - -                            24, 500. 00
1 Includes $5,000 revoked during July 1937.
2Exclusive of available funds.
                                         2. WHITE RIVER, ARK.
   Location.-This river rises in northwestern Arkansas and flows
690 miles, first north into Missouri, then southeasterly through Ar-
kansas to the Mississippi River, 45 miles above Arkansas City, Ark.
(See Mississippi River Commission AJluvial Valley map, scale
1: 62,500 and scale 1: 500,000, for river from mouth to vicinity of
Newport, Ark., and U. S. Geological Survey State map, scale
1: 500,000.
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1871, .June 23, 1874, August 14, 1876, June 14, 1880, July
5, 1884, and March 3, 1899.
   The cost and expenditures on previous project prior to commence-
ment of existing project in 1899, which applied solely to White River,
were $366,000, distributed as follows:
New work :
   For open-channel improvements---------------------------- $351, 740. 11
   For special works at Batesville----------------------------- 11, 061. 46

                                                                                                                     362, 801. 57
Mlaintenance for open-channel improvement---
                                       ..........                                                                      3, 198. 43
         Total- -_--                --          -       -             -             -          -         -           366, 000. 00
        RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT                869
    For further details see page 1874 of Annual Report for 1915.
    Existing project.-This provides for channel maintenance between
the mouth of the river and Batesville, 301 miles, by snagging and
dredging and by contraction works. The stream has an ordinary
freshet fluctuation of 15 feet throughout the portion covered by the
project, and an extreme stage fluctuation of 60 feet at the mouth, and
of 36 feet at Clarendon, Newport, and Batesville. No estimate of
cost has been given, and since 1899 the work has been prosecuted
under annual estimates for maintenance by snagging and dredging.
The latest (1934) approved estimate for annual cost of maintenance
is $145,000.
    The existing project was authorized by the River and Harbor Act
of July 13, 1892, which made appropriation for completion of prior
project for improving the river from its mouth to Forsyth, Mo., and
provided that the additional sum appropriated should be expended
 "in the discretion of the Secretary of War." The River and Harbor
Act of March 3, 1899, adopted a project for the improvement of the
river above Batesville by locks and dams, thereby making that place
the head of the open-river improvement project. Sketch map of
Little Rock district printed in Annual Report for 1911, opposite page
1877, includes a sketch outline of this stream.
    Terminal facilities.-Railway spur tracks are available for trans-
fer of freights between car and boat at Newport and Clarendon.
There are log slips for use of the owners only at those towns and at
Augusta, Des Arc, Crocketts Bluff, and St. Charles. Steamboat
warehouses are maintained at St. Charles and Crocketts Bluff pri-
marily for the use of the owners. In 1932 a rice terminal was
erected by local interests at Prestons Ferry, and a cotton, rice, and
general merchandise terminal was built at Devalls Bluff.
    Operations and results during fiscal year.-All actual operations
were for maintenance by hired labor with Government and leased
plant and consisted of snagging and dredging operations. The snag-
ging was done between the mouth and Jacksonport (264 miles) by the
Government snag boats Arkansas, C. B. Reese, and Tom Stallings.
By those operations 2,075 snags, 100 saw logs, 230 stumps, and 8
drift rafts were removed from the channel, and 1,684 trees felled
on caving and sliding banks. The Arkansas operated between the
mouth and Devalls Bluff (125 miles) between the dates of July 13 and
October 16, 1936. The C. B. Reese operated between the mouth and
Clarendon (101 miles) between the dates of October 21 to 31, and
November 15 to December 2, 1936. The Tom Stallings worked over
the river between Clarendon (101 miles) and Jacksonport (264 miles)
between the dates of July 1 to October 20, 1936. The dredging
operations were carried on over the river at various shoals between

                                           0518
the mouth and Newport, Ark. (258 miles), by hired labor and the
use of U. S. sand and gravel dredge No.           and attendant plant.
Shoals were dredged to provide 41/2-foot depth between the mouth
and Newport (258 miles) during the low-water period between July
27 and October 24, 1936.
   The costs during the year were for snagging $41,556.23 and for
dredging $78,581.20, a total cost of $120,137.43. The expenditures for
the year were for snagging $44,552.66 and for dredging $78,581.20, a
total of $123,133.86.
870        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Condition at end of fiscal year.-The project being for maintenance,
completion is not contemplated. All channels dredged in the sec-
tion of the river between the mouth of Black River and Batesville
have been obliterated by floods, and there is no increase in channel
depth over the shoals in that section of the stream. Snagging and
dredging operations have materially improved the condition of the
channel from the mouth as far as the mouth of Black River, 265
miles.
   This river is generally spoken of as navigable to the mouth of
Black River by boats of 3-foot draft at any time. Under ordinary
conditions 6-foot draft may be taken to the mouth of Black River
from the first of February to the last of June, and again from the
middle of November to the end of December. During the fiscal
year ending June 30, 1937, a navigable depth of 3 feet was main-
tained throughout the year as far as the mouth of Black River (265
miles). TFrom the 25th of September to June 30, 1937, 5-foot draft
could be taken to Devalls Bluff (125 miles) and from the first of
November to June 30, 1937, 41/2-foot draft could be taken to the
mouth of Black River.
The total costs under the existing project to June 30, 1937, are:
For maintenance:
    Snagging operations ---------------------------------------         $760, 269. 42
      Dredging operations                  --------------                344, 647. 77

        Total------------------------------------------------        1, 104, 917. 19

Specials :
    Augusta, for prevention of cut-off --------------------------            314. 84
    Devalls Bluff, for prevention of cut-off---                              883. 36
    Little Red River, snagging:
         1914----------------- ---------------------------------             500. 00
         1935-------------------------_     -------------------------        358. 80
            Total--------------------------------           ------         2, 057. 00
            Total costs to June 30, 1937                              , 106, 974. 19
                                                                     1_______________________
   The total expenditures were $1, 477,083.65.
   Proposed operations-Memphis district.- -Of the balance unex-
pended at the end of the year, $18,758.84, $3,000 was revoked on July
1, 1937. The remaining balance of $15,758.84 together with $98,000
allotted from War Department Appropriation Act of July 19, 1937,
a total of $113,758.84, will be applied to maintenance of channel
under approximate distribution as follows:
Accounts payable June 30, 1937- _-_-_-__                                  $7, 129. 46
Snagging operations between the mouth and Peach Orchard Bluff,
  about 2 months each with Government snag boats Arkansas and
  Stallings and hired labor, in period July-December 1937--------_        15, 000. 00
Dredging between mouth and Peach Orchard Bluff with hired labor
  and Government or leased plant, 4 months, in period August-
  December 1937----------------------------------------------             91, 629. 38
        Total for all work---------------------------------------        113, 758. 84
  The additional sum of $110,000 can be profitably expended during
the fiscal year 1939, as follows:
               RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT
                                                                                                                   871
Snagging operations between the mouth and Peach Orchard Bluff,
  about 2 months each with 2 Government snag boats, with hired
   labor, in period July-December 1938-_----------                    --              ---         ___      $15, 000. 00
Dredging for 4 months with hired labor and Government or leased
  plant between the mouth of the river and Peach Orchard Bluff,
  in period August-December 1938-----------------------------                                               95, 000. 00
       Total for all work________ __________________________ 110, 000.00
  NOTE.-Operations above Peach Orchard Bluff are now a function of the
Little Rock district.
      Little Rock district.-Of                  the allotment of $65,000 from the War
Department Appropriation Act of July 19, 1937, $20,000 ($45,000 is
for Upper White River-see report under that heading) will be
applied to maintenance of channel under approximate distribution
as follows:
Snagging operations between Peach Orchard Bluff and mouth of
  Black River, about 11/2 months with Government snag boat Tom
  Stallings and hired labor, in period July-December 1937.---------- $6, 000. 00
Dredging between Peach Orchard Bluff and Newport with hired
  labor and Government or leased plant, about 1 month, in period
  July-December 1937______________________-------------______________ 14, 000. 00
           Total for all work_______________-_____-___________                                              20, 000.00
  The additional sum of $20,000 can be profitably expended during
the fiscal year 1939, as follows:
Snagging operations between Peach Orchard Bluff and mouth of
  Black River, about' 11/2 months with Government snag boat, with
   hired labor, in period July-December, 1938 _.__                          __-----                         $6, 000. 00
Dredging for about 1 month with hired labor and Government or
leased plant between Peach Orchard Bluff and Newport, in
period August-December 1938________----__--------------------                                             14, 000. 00
          Total for all work_____________________---                                                       20, 000.00

                                      Cost and financial summary
Cost of new work to June 30, 1937___ ___________________----$362, 801. 57
Cost of maintenance to June 30, 1937__----_____---- ---------- 1, 133, 055.26
      Total cost of permanent work to June 30, 1937_                                                  1, 495, 856. 83
Undistributed costs June 30, 1937------------------------------                                            4, 624. 88

      Net total cost to June 30, 1937___._--- -----                        -------                    1, 500, 481. 71
Plus accounts receivable June 30, 1937_--------                              ____-___                      3, 189. 97

      Gross total costs to June 30, 1937-----------------------1,                                          503, 671. 68
Minus accounts payable June 30, 1937_    -------------------                                                 3, 705. 39
     Net total expenditures_____________________      ___     1, 499, 966. 29
Unexpended balance June 30, 1937_____________________________     18, 758. 84
          Total amount appropriated to June 30, 1937-------------                                     1, 518, 725. 13

      Fiscal year ending June 30         1933           1934            1935                  1936             1937


Cost of new work----------
Cost of maintenance--_- _ ..--- _      $69, 385.33    $71,  85 1 $106,327.68
                                                         555.                           $127,132.54         2$143,
                                                                                                                 020. 07
Total expended....-----------------     76, 834. 72    65, 526. 57   167, 769. 66           129, 142. 21     2 146, 016. 50
Allotted.......
       ----------------------          124, 446. 22   124, 055. 15    77904. 86             163, 000. 00     -27, 000.00

  1Includes $22,882.64 for operating and care reported under "Upper White River."
  2   Includes $358.80 for Little Red River, Ark.
872      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936_         _    -- --                      $191, 775.34
Deductions on account of revocation of allotment----        -----          27, 000. 00

      Net amount to be accounted for-- -------------------                164, 775. 34
Gross amount expended--------------------------- $158, 669.03
Less reimbursements collected   ---------------------      12, 652. 53
                                                                          146, 016. 50
      Balance unexpended June 30, 1937-------------------                  18, 758. 84
Outstanding liabilities June 30, 1937_---_------- --- $3, 705. 39
Amount covered by uncompleted contracts .........      3, 424. 07
                                                                            7, 129. 46

     Balance available June 30, 1937___-------------------------           11, 629.38
Accounts receivable June 30, 1937-----------------------------              3, 189. 97

     Unobligated balance available June 30, 1937---------------            14, 819. 35
Amount allotted during July 19371--------------------------------         157, 000. 00

        Balance available for fiscal year 1937 1_____________-            171, 819. 35
Amount that can be profitably expended in fiscal year ending June
                           1     -- - -
30, 1939, for maintenance 2___________ ____________          __          176, 000. 00
  1Includes $45,000 for Upper White River, $6,000 for snagging and $14,000 for dredg-
ing, all in Little Rock district.
  2 Exclusive of available funds.

                      3. BLACK RIVER, ARK. AND MO.

   Location.-This river rises in Iron County, Mo., and flows in a
southerly direction 300 miles to White River, at Jacksonport, Ark.
 (See Mississippi River Commission alluvial valley map, scales,
1:62,500 and 1: 500,000; and U. S. Geological Survey State maps,
scale 1: 500,000.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871. It is not practicable to state the amount expended
under the project; however, it is known to have been very small.
For further details see page 1877, Annual Report for 1915.
   Existing project.-This contemplates improvement of the river
below Poplar Bluff, Mo., 213 miles, by snagging operations, by deep-
ening the water on shoals by wing dams, and by concentrating the
water into one main channel by the closure of secondary channels.
   The stream has an ordinary freshet fluctuation of 10 feet at Poplar
Bluff, 4 feet near Corning, Ark., and 15 feet at the mouth. Its ex-
treme stage fluctuations are 19 feet at Poplar Bluff, 11 feet near
Corning, Ark., and 36 feet at the mouth. The original estimate was
$80,800, to be expended in two working seasons (Annual Report
for 1880, p. 1326). The River and Harbor Act of September 19,
1890, appropriated an amount to complete the estimate and author-
ized maintenance of the improvement. While dredging is not men-
tioned in the project, it is necessary as a means of maintenance and
has been authorized. The latest (1928) approved estimate for annual
cost of maintenance is $18,000.
   The existing project was adopted by the River and Harbor Acts
of June 14, 1880, and March 3, 1881. (Annual Report for 1880, p.
1325.) The approximate location and course of the navigable por-
tion of this stream are shown in district map (sketch) printed in
Annual Report for 1911, opposite page 1877.
          RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT                                  873

   Terminal facilities.-Privately owned log slips or chain conveyors
for the use of the owners are maintained at the several saw and stave
mills. The facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.--All operations were for
maintenance by hired labor and Government plant. The operations
were by the snag boat Tom Stallings, which worked over the river
from its mouth to Black Rock, 67 miles, and by the snag barge Harve
Goodwin, which worked over the river between Black Rock (67 miles
above the mouth) and Poplar Bluff (211 miles above the mouth).
The results accomplished were the removal from the channel of 1,510
snags, 102 logs, 234 stumps, .and 19 drift rafts, and the felling of
2,480 and the girdling of 119 trees. The costs during the year were
$14,371.23, and the expenditures $15,402.72, all for maintenance.
   Condition at end of fiscal year.-The project being for mainte-
nance, completion is not contemplated. The wing dams built at two
islands during the early operations under this project are of no effect
now. Of the channels dredged under later operations, only that at
Julia Dean remains, and it is only fairly effective. Snagging opera-
tions have materially improved conditions, and made navigation pos-
sible to Poplar Bluff (211 miles) by boats of 18-inch draft and to
Current River (96 miles) by boats of 2.5-foot draft during low-water
period.
   The periods of 3-foot navigation to Poplar Bluff were from Octo-
ber 11-13, October 25 to November 20 and continuously from Decem-
ber 30 to May 27 and from June 10 to 24.
   One and four-tenths feet was the controlling depth to Poplar Bluff
during the period of lowest water.
   The costs were $80,000 for new work and $499,943.60 for mainte-
nance, a total of $579,943.60. The total expenditures were $581,240.07.
   Proposed operations-Little Rock district.-The balance unex-
pended at end of the year, $4,461.07, together with $20,000, allotted
from War Department Appropriation Act of July 19, 1937, a total
of $24,461.07, will be expended for maintenance of channel by snag-
ging operations, using Government plant and hired labor, as follows:
Accounts payable June 30, 1937_---__----___-----------------------  $2, 874. 21
Snagging between the mouth and Poplar Bluff, Mo.:
    With U. S. snag boat Tom Stallings, about 3 months during the
      summer and fall of 1937 -----------------------------         12, 000. 00
    With U. S. snag barge Harve Goodwin, about 6 months during
      summer and fall of 1937_____-------- -----       ____-------_  9, 586. 86

       Total for all work_----        _____-----------------      ---             24, 461.07
  The additional sum of $24,500 can be profitably expended during
the fiscal year 1939, to be applied to snagging operations between the
mouth and Poplar Bluff, Mo., about 6 months with Government snag
boats and hired labor, July to December 1938.
                              Cost and financial summary

Cost of new work to June 30, 1937-- -------      -------------          _        $80, 000.00
Cost of maintenance to June 30, 1937_ __---___.__-----_--_--__.                  499, 943. 60
       Total cost of permanent work to June 30, 1937----                ------   579, 943. 60
874                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Undistributed costs June 30, 1937__________                                                                      $1, 002. 04

      Net total cost to June 30, 1937       _____________                                                        580, 945. 64
Plus accounts receivable June 30, 1937______________________                                                       2, 110. 91
      Gross total costs to June 30, 1937_______ ---                                         __-______            583, 056. 55
Minus accounts payable June 30, 19371_________-                                             _______- -             1, 816. 48
      Net total expenditures-----------------------------------581,                                                   240. 07
Unexpended balance June 30, 1937_______________-
                                         --       -     _____ ___                                                  4, 461. 07

              Total amount appropriated to June 30, 1937-----.---------                                          585, 701. 14


      Fiscal year ending June 30                     1933           1934            1935            1936              1937


Cost of new work ....--------...------.
Cost of maintenance....------------ $24, 697. 67
                                                                         .. . .. . .. .. . .. . .. .. . .. . .. .. . .. .
                                                                        ---..
                                                                  $15, 405. 66    $21, 941. 70   $20, 890. 52
                                                                                                                   ----------
                                                                                                                 $14, 371.23
Total expended................-----------------..   17, 939. 37    14, 456. 90   - 52, 906. 17     20, 627. 12        15, 402. 72
Allotted..----------------------                    31, 171. 16    17, 011.85    - 50, 308. 15     23, 000. 00       -3, 500.00


Balance unexpended July 1, 1936_______________________-____----                                                  $23,363. 79
Deductions on account of revocation of allotment --                                        _____     ___-          3, 500.00

      Net amount to be accounted for_____________________ ___ _                                                   19, 863. 79
Gross amount expended ____________________________ $32, 520. 38
Less reimbursements collected_------------------------17, 117. 66
                                                                                                                  15, 402. 72

      .Balance unexpended June 30, 1937__----__--_---_---------                                                    4, 461.07
Outstanding liabilities June 30, 1937____________________ $1, 816. 48
Amount covered by uncompleted contracts__ _________-_           1, 057. 73
                                                                                                                   2, 874. 21

      Balance available June 30, 1937__ _-___ _____ ____    ___                                                    1, 586. 86
Accounts receivable June 30, 1937_______________________________                                                   2, 110.91

     Unobligated balance available June 30, 1937__ __________---3, 697. 77
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------------- --------------------------- 20,000. 00
             Balance available for fiscal year 1938                                 --------                _     23, 697. 77
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24, 500. 00
     1 Exclusive of available funds.

                                       4. CURRENT RIVER, ARK. AND MO.

  Location.-This river rises in Dent County, Mo., and flows in a
southerly direction 200 miles to Black River, about 5 miles above
Pocahontas, Ark. (See Mississippi River Commission Alluvial
Valley Map, scales 1: 62,500 and 1: 500,000, and U. S. Geological
Survey State maps, scale 1: 500, 000.)
  Previous projects.-Adopted by the River and Harbor Acts of
June 10, 1872, and March 3, 1881. The cost and expenditures there-
under were $7,000. For further details see page 1878, Annual Re-
port for 1915.
  Existing project.-This provides for the improvement of the river
from its mouth to Van Buren, Mo., 94 miles, by snagging operations
             RIVERS AND HARBORS-MEMPHIS,                                               TENN., DISTRICT                      875

and by contracting the channel at the worst shoals by wing dams.
The stream has an ordinary freshet fluctuation of 13 feet throughout
the portion covered by the project and an extreme stage fluctuation
of 26 feet at Van Buren, Mo., and of 22 feet at its mouth.
  The estimate of cost for new work was $10,000, exclusive of
amounts expended on previous projects. The latest (1928) approved
estimate for annual cost of maintenance is $4,500.
  The existing project was adopted by the River and Harbor Act of
August 18, 1894 (Annual Report for 1891, p. 2065). A sketch map
of the river is given in House Document No. 157, Fifty-first Con-
gress, second session.
  Terminal facilities.-Privately owned log slips and tie hoists for
the use of the owners only exist at Van Buren and Doniphan.
   Operations and results during fiscal year.-All operations were for
maintenance and were by hired labor with Government plant. The
snag barge Harve Goodwin worked over the river below the Arkan-
sas-Missouri State line (41 miles) during the period November 6 to
December 14, 1936, removing from the channel 182 snags, 5 saw
logs, 71 stumps, and felling 69 and girdling 9 trees. The costs and
expenditures during the year were $1,670.93, all for maintenance.
   Condition at end of fiscal year.-The project being for mainte-
nance, completion is not contemplated. Operations under the project
have been limited to removal of snags and boulders between Van
Buren and Doniphan, Mo., and removal of snags below Doniphan.
At the close of the fiscal year the channel obstructions are only those
that have been brought in by late freshets. The controlling channel
depths in low-water seasons are 3 feet from the mouth to White
Horse Shoal, 31 miles; 14 inches to Caughorn Creek, 17 miles far-
ther; and 10 to 12 inches to Van Buren, an additional 46 miles.
  The costs have been $10,000 for new work and $119,962.53 for
maintenance, a total of $129,962.53. The expenditures were the same.
  Proposed operations.-Due to the absence of any commerce on the
river further reports and work will be discontinued until such time
as there may be a resumption of navigation on the river.
                                          Cost and financial summary

Cost of new work to June 30, 1937------------------------------                                                     $17, 000. 00
Cost of maintenance to June 30, 1937_______                     -                                                   119, 962. 53
         Total cost of permanent work to June 30, 1937 ------------                                                 136, 962. 53
Net total expenditures____-------__-1_____                                        -      -          ---            136, 962. 53
Unexpended balance June 30, 1937_______--                                 ____________________                           137. 38

         Total amount appropriated to June 30, 1937__--                                                              37, 099. 91
                                                                                                                    1----------


         Fiscal year ending June 30                           1933         1934              1935           1936          1937


Cost of new work ...------------
Cost of maintenance .. _        .             ____---
                                                   .     -_ $2, 377. 64     $37. 15      $2, 852. 21      $2, 485. 35   $1, 670. 93
Total expended_....     .......---------------              2, 377. 64       -. 53        2, 889. 36       2, 485. 35     1, 670. 93
Allottd ____-__-__--___-        -......----      .....       3, 437. 22   2, 899. 47      2, 662. 33       3, 500. 00   -3, 000. 00
876       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936__----___--__
                                  ---                        -__       $4, 808. 31
Deductions on account of revocation of allotment--- --------     __.    3, 000. 00
      Net amount to be accounted for----__---     ________-             1, 808. 31
Gross amount expended      --------------- __ _____ $1, 702. 21
Less reimbursements collected ------------       -__31.      28
                                                                        1, 670. 93
      Balance unexpended June 30, 1937_           __137.38

      5. ST. FRANCIS AND L'ANGUILLE RIVERS AND BLACKFISH
                           BAYOU, ARK.

   Location.-The St. Francis River rises in St. Francois County,
Mo., and flows in a southerly direction 460 miles to the Mississippi
River, 8 miles above Helena, Ark. The L'Anguille River has its
source in the flat lands of Poinsett and Craighead Counties, Ark.,
whence it flows 109 miles in a southerly direction, cutting through
Crowleys Ridge and entering the St. Francis Basin at Marianna and
flowing into the St. Francis River 12 miles above the mouth of the
latter. Blackfish Bayou rises in the west-central portion of Critten-
den County, Ark., flows 52 miles in a southwesterly direction, and
empties into the St. Francis River about 38 miles above the latter's
mouth. (See Mississippi River Commission alluvial valley map,
scales, 1: 62,500 and 1: 500,000, and U. S. Geological Survey State
map, scale 1: 500,000.)
   Previous projects.-The original project for improvement of St.
Francis River was adopted by the River and Harbor Acts of March
3, 1871, June 14, 1880, July 5, 1884, August 11, 1888, and June 13,
1902, the latter adding L'Anguille River to the improvement. The
original project for L'Anguille River was adopted by River and
Harbor Act of June 18, 1878. The original project for Blackfish
Bayou was adopted by River and Harbor Act of June 25, 1910
 (H. Doc. No. 73, 61st Cong., 1st sess.). The cost and expenditures
were $92,000.34 for new work and $90,345.15 for maintenance, a
total of $182,345.49. For further details see pages 1878 and 1879,
Annual Report for 1915, and page 1147, Annual Report for 1918.
   Existing project.-This provides for the removal of snags in St.
Francis River from its mouth to Marked Tree, in L'Anguille River
from its mouth to Marianna, and in Blackfish Bayou from its
mouth to Fifteenmile Bayou, with the object of maintaining the
channels clear of snags and similar obstructions at the lowest navi-
gable stage. The latest (1928) approved estimate for annual cost of
maintenance is $8,500.
   Within the limits of the project the St. Francis River has an ordi-
nary freshet fluctuation of about 12 feet when not affected by back-
water from the Mississippi River. The extreme stage fluctuation is
about 26 feet at Marked.Tree, gradually' increasing to 60 feet at the
mouth. These extreme stage fluctuations are produced by overflow
and backwater from the Mississippi River. When not influenced by
the flood stages of that river the maximum stage of the St. Francis
below Marked Tree does not exceed 20 feet. The ordinary freshet
fluctuation of L'Anguille River is about 6 feet and extreme stage
range 50 feet at Marianna; this latter, however, is due to backwater
from the Mississippi River. L'Anguille River, when uninfluenced by
               RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT                                                 877

the Mississippi River, never has a fluctuation exceeding 12 feet. The
fluctuation of stage in Blackfish Bayou is about 48 feet, due entirely
to backwater from the Mississippi River.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 60, 64th Cong., 1st sess.). A published
map of these streams is in that document.
   Terminal facilities.-At Parkin a railroad-owned log slip pro-
vides a means of transfer of rafted commerce to railway car. Log
slips or chain conveyors for the use of the individuals owning them
exist at the several mills along the river. The present terminal
facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-All operations were
for maintenance by hired labor and Government plant. The snag
barge Stephen Anderson worked over the St. Francis River between
the mouth and 10 miles above Marked Tree (158 miles above the
mouth), over the L'Anguille River up to Marianna (8 miles) and in
Blackfish Bayou up to the mouth of Fifteenmile Bayou (6 miles).
The results of these operations are shown in the following table:
                                    Summary of snagging operations

                                                                            Snags     Logs    Stumps    Trees cut

St. FrancifsRiver              --         -------------------------------    1, 439     410       135         957
L'Anguille River -----------------------------------------                       68      22         7           0
Blackfish Bayou------------------------------------------                        59       0         0          68

       Total-------- ---------              -------------------------        1, 566     432      142        1, 025



   The costs were $9,628.73, and the expenditures $10,002.97, all for
maintenance.
   Condition at end of fiscal year.-Snagging operations have been
the only activities under existing or previous projects. The chan-
nels within the limits of the project are in good condition for navi-
gation during medium and higher stages. At low stages snags are
the principal obstruction. Under average conditions boats of 4-foot
,draft can ply St. Francis River to Marked Tree until the middle of
July, and boats of 2-foot draft until the latter part of August each
year. During period of lowest water, which generally occurs in
'October and November, channel depths do not exceed 12 to 16 inches
in any part of the river. The low-water depths in Blackfish Bayou
to Fifteen-mile Bayou and L'Anguille River to Marianna are but 8
to 10 inches. The navigation periods on those streams are controlled
in the main by backwater stages from the Mississippi River. During
this fiscal year the period for 4-foot draft to Marked Tree prevailed
from November 23 to 30 and January 11 to March 22, and for an
aggregate of 14 additional days during several short periods between
October 18 and November 30. A 4-foot draft was available to
Marianna continuously from November 3 to June 30, 1937, a total
of 239 days. During periods of lowest water, controlling depths
were 1.3 feet.
   The costs under the existing project to June 30, 1937, were $154,-
094.12, and the expenditures $154,673.16, all for maintenance.
878            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Proposed operations.-The balance unexpended at the end of the
year, $1,677.30, together with $9,300 allotted from War Department
Appropriation Act of July 19, 1937, a total of $10,977.30, will be
expended in channel maintenance by snagging operations on the three
streams with Government plant and hired labor, as follows:
Accounts payable July 1, 1937___________________________________                                                    $590. 81
Snagging with Government snag barge on St. Francis River below
  navigation lock about 10 miles above Marked Tree, about 6 months,
  July-December, 1937, including 10 days' snagging each on
   L'Anguille River and Blackfish Bayou__________________________                                                 10, 386.49

                                                                                                                  10, 977. 30
  The additional sum of $10,500 can be profitably expended during
the fiscal year 1939, to be applied to snagging operatings, about 6
months, July-December, 1938, with Government snag barge and hired
labor, below navigation lock about 10 miles above Marked Tree, on St.
Francis River, including 10 days' snagging each on L'Anguille River
and Blackfish Bayou.
                                         Cost and financial summary

Cost of new work to June 30, 1937.--                                -        -          -                     $92, C00. 34
Cost of maintenance to June 30, 1937__                                                                        244, 439.27

          Total cost of permanent work to June 30, 1937_____________ 33, 439. 61
Undistributed costs June 30, 1937_______________________________                                                     448. 72

          Net total cost to June 30, 1937________________________                                             336, 888. 33
Plus accounts receivable June 30, 1937                                     --            ---                         264. 57

          Gross total costs to June 30, 1937                               -----.                             337, 152.90
Minus accounts payable June 30, 1937_________________________                                                         134.25

     Net total expenditures______--- _____-____-_____                                                         337, 018. 65
Unexpended balance June 30, 1937____________________________                                                    1, 677. 30

          Total amount appropriated to June 30, 1937.--                                     -----             338, 695. 95


          Fiscal year ending June 30                    1933              1934           1935         1936            1937


Cost of new work_ -------------------- ------------                 ------------          ----- ----------------
Cost of maintenance-----....------------------       $10, 196. 47       $8, 214. 23   $9, 229. 75   $8, 358. 08      $9, 628.73
Total expended ............-----------------------     8, 746. 83        6, 685. 62   -1, 440. 02   8, 492. 51       10, 002. 97

Allotted---------------------------------             17,283.50          7,964.72       -319. 07     9, 500. 00     -1, 000.00


Balance unexpended July 1, 1936_  ------------------------------- $12, 680. 27
Deductions on account of revocation of allotment _______ _____      1, 000. 00

      Net amount to be accounted for__________________________                                                    11, 680. 27
Gross amount expended-----------------------        - $11, 677. 03
Less reimbursements collected----------------------     1, 674. 06
                                                                                                                  10, 002. 97

      Balance unexpended June 30, 1937 _______________________                                                     1, 677. 30
Outstanding liabilities June 30, 1937 -------------------- $134. 25
Amount covered by uncompleted contracts                     456. 56
                                                                                                                      599. 81

          Balance available June 30, 1937------                                        ____----       -_           1, 086. 49
             RIVERS AND HARBORS-MEMPHIS,                                            TENN., DISTRICT                               879
Accounts receivable June 30, 1937_ _-__ _- __-__------------------                                                            $264. 57

     Unobligated balance available June 30, 1937_------------                                                                1, 351. 06
Amount allotted from War Department Civil Appropriation Act, ap-
  proved      July 19,       1.937_.                         ---------------                                                 9, 300. 00

     Balance available for fiscal year 1938 -----------------                                                              10, 651. 06
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1------------------------------                                                          _     10, 500. 00
  1 Exclusive of available funds.


                                  6. UPPER WHITE RIVER,                                ARK.

   Location.-These works are on the White River, Ark., lock and
dam no. 1 being 1 mile below Batesville, Ark., and nos. 2 and 3 being
7.8 and 19.7 miles, respectively, above that city. (See Mississippi
River Commission alluvial valley map, scale 1:500,000, and U. S.
Geological Survey map, scale 1: 500,000.)
   Previous projects.-See Previous projects of White River, page
1874, Annual Report for 1915.
   Existing project.-This provides for the construction of 10 fixed
dams with concrete locks to give 4-foot navigation the year around.
The River and Harbor Act of March 2, 1907, after providing for the
completion of the third lock and dam, abandoned further construc-
tion work, its language fixing the appropriation carried therein as
the final one. The stream is nontidal, with an ordinary freshet fluc-
tuation of 16 to 18 feet, and with an extreme stage fluctuation of 38
feet just below lock no. 1 and of 51 feet at Calico Rock, 39 miles
above lock no. 3.
   The estimated cost for the 10 locks and dams originally projected
was $1,600,000. The estimate of annual cost of operation and care
of the three locks and dams, made in 1936, is $42,500.
   The existing project was adopted by the River and Harbor Act
approved March 3, 1899 (H. Doc. No. 78, 54th Cong., 2d sess.). The
River and Harbor Act of March 2, 1907, directed the abandonment
of further new work on the project (H. Doc. No. 150, 59th Cong., 1st
sess.). Operation and care of the locks and dams were included in
the project July 1, 1935, under the provisions of the Permanent
Appropriations Repeal Act approved June 26, 1934.
   The locations, dimensions, etc., of the three completed locks and
dams are as follows:

                                                 Lock no. 1                     Lock no. 2                           Lock no. 3


Location_ _.---_---------------- Batesville .....----------             Earnheart--_---------_               Walls Ferry.
Distance from mouth of river..   300.6 miles--       ..--------         309.4 miles--...--------             321.3 miles.
Dimensions of locks:
    Length   available --------  147  feet-------------                 147 feet-------------.........        147 feet.
    Width between walls ------36 feet----------------                   36 feet ...---.....-----------       36 feet.
    Lift at low water _......... 13.5 feet-------- ----                 14 feet------------            --     15 feet.
    Depth on lower sill----      5.5 feet__--------                     5 feet     ..      ..-------------   4 feet.
    Depth on upper sill ........ 5 feet ..-----                              do         ...-------.------    5 feet.
    Foundations _-------------   Bedrock_-                              Bedrock ----- _                      Bedrock.
Dams:
    Kind of -    ---                     Fixed_-                       Fixed_       _      -                 Fixed.
    Type of construction_ --...          Timber crib filled with       Timber crib filled with               Timber crib filled with
                                             stone.                       stone.                               stone.
   Length -660.5                                feet.-                  658 feet                             750.7 feet.
Date opened to navigation                1904                           1905_ _-                             1908.
Date of completion _.        ..------    1904                           1905                                 1908.
Cost of construction    --               $278,587.56     -              $297,627.94       -       .          $236,981. 31.


         20196-37-pt. 1 --              56
880                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   All dams are with concrete caps.
   The approximate location of these locks and dams is shown on dis-
trict map (sketch) printed in Annual Report for 1911, opposite page
1877.
   Terminal facilities.--Log slips, derricks, and conveyors exist at the
several woodworking establishments, all for the individual use of
the owners. The terminal facilities are considered adequate for the
present commerce.
   Operations and results during fiscal year.-All work was for main-
tenance with hired labor and Government plant. At locks and dams
nos. 1, 2, and 3 work during the year was limited to operation of the
locks and to routine maintenance of appurtenant river structures and
buildings and grounds.
                                                         Channel dredging

                        Place                                          Date                    of cut Width
                                                                                               Length of cut     Mud       Gravel


                                                                                                Feet   Feet     Cu. yds.   Cu. yds.
Fleet Harbor_---.-.--..-.---...-..                   September 1936-----------..........--..     300      60      3, 725              0
Maxwell Shoal-....-.-..-.--.---.-                    August 1936_ _----------------           387         35           0       1. 270
Flinn Shoal.......................-----------------------do .........---------------------    526         35           0       1,667
Cackling Pullet Shoal............._....-- do.....---------------------                        463         35           0       1,675
Batesville Shoal--                                 ---- do- ------------------- 1, 021
                                           --- .....                                                      35           0       3, 191
McClelland Shoal-------__--. .-- August-September 1936.....                                1, 401         35           0       4, 970
Shoal above highway bridge, Bates- September 1936-.............                               653         35           0       3, 457
  ville.
       Total---------------.................   ------------------------------                  4, 751--------     3, 725      16, 280



  The cost for operation, maintenance, and repair of the work dur-
ing the fiscal year was $33,004.27, and the expenditures were $32,-
852.30. In both cost and expenditures there is included an item of
$22,882.64 covered by cost and financial summary for White River,
Ark.
  Condition at end of fiscal year.-The new work accomplished to
the end of the fiscal year is the construction of the three locks and
dams mentioned under paragraph "Existing project." They repre-
sent the project as 30 percent completed when further construction
was suspended. These works give, by aid of dredging, all-year-
round slack-water navigation for 3-foot draft from 1 mile below
Batesville to Guion, 33 miles.
  The total costs to the end of the fiscal year were:
For new work (construction of locks and dams) --------------      $813, 196.81
For maintenance (operating and care) (includes $22,882.64 covered
  by cost and financial summary for White River, Ark.)               9, 882. 64
                                                                    6---------
           Total cost to June 30, 1937---------------------------883, 079. 45
    The total expenditures to the end of the fiscal year were:
For new work (construction of locks and dams)                     $813, 196. 81          -----------------
For maintenance (operation and care) (includes $22,882.64 covered
  by cost and financial summary for White River, Ark.) ---------    69, 882. 64
           Total expenditures to June 30, 1937-----------------------                                                883, 079. 45
   In addition the sum of $1,187,282.59 was expended between Janu-
ary 16, 1904, and June 30, 1935, on the operation and care of the
works of improvement under the provision of the permanent indefi-
nite appropriation for such purposes.
                  RIVERS AND HARBORS--MEMPHIS, TENN., DISTRICT                                                         881
  Proposed operations (Little Rock district).--Of the allotment of
$65,000 from the War Department Appropriation Act of July 19,
1937, for White River, Ark., $45,000 will be expended for operation
and maintenance of the three locks and dams during the fiscal year
1938, under approximate distribution as follows:
Operation of locks and dams and other works--------------------$8,400
Maintenance and repairs_ ...... ---------      _________--               16, 600
Improvement and reconstruction _____                -------------------   3, 200
Channel work--        -----------------------------------------           6,800
Central warehouse and storage yard__                                       , 000
                                                                          8-----------------------
Emergencies_--------------           ----------------------------------- 2, 000

            Total for all work------------------------------------                                                  45, 000
  The additional sum of $46,000 can be profitably expended for op-
eration and maintenance in the fiscal year 1939, as follows:
Operation of locks and dams and other works ___----              ___-------          $9, 000
Maintenance and repairs       ------------------------------------- 11,000
Improvement and reconstruction__                            -----------------------    5, 000
Channel work--------     ---------------------------------------                       8, 000
Central warehouse and storage yard----- ---                       -         -__ ___- 8, 000
Emergencies-----------------------------------------------                            5, 000
            Total for all work-                       -            __- -
                                                                  -______-         --                   -           46,000

                                           Cost and financial summary
Cost of new work to June 30, 1937__-___________-
                                      -___-                                                               $813, 196. 81
Cost of maintenance to June 30, 1937_______________________                                             11,234,282. 59
      Total cost of permanent work to June 30, 1937----------2, 047, 479. 40
Net total expenditures   ---------------------------------- 2,047, 479. 40
Total amount appropriated to June 30, 1937____- __________   12,047, 479.40

            Fiscal year ending June 30                 1933           1934              1935          1936           1937


Cost of new work -......................
Cost of maintenance....-------------------         $58, 397. 16    $34. 342. 88   $36, 583. 96   $38, 549. 58      $10, 121.63
Total expended-....-----------------------          47, 974. 19     19, 517. 83    26, 641. 44    23. 877. 23        9, 969. 66
Allotted...........-----------------------------    47, 884. 92     16, 875. 81    68, 500. 00 -11,    510. 25



Balance unexpended July 1, 1936___-__        _                                     -_____-----                   $9, 969. 66
Gross amount expended __-____-_-___-------                                          $13, 248. 19
Less reimbursements collected_---- -----------                                      - 3, 278. 53
                                                                                                                  9, 969.66
Amount allotted during July 1937 ------------
                                        _-__-------                          45, 000. 00
Balance available for fiscal year 1938 ---------------       _-_-            45, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance----------------------------                  46, 000. 00
1Includes $1,187,282.59 from permanent indefinite appropriation for operating and care.

                         7. WOLF RIVER (MEMPHIS HARBOR),                                       TENN.

  Location.-Wolf River rises in Benton County, Miss., and flows
generally northwesterly about 100 miles, through Shelby County,
Tenn., emptying into the Mississippi River within the corporate
limits of the city of Memphis, Tenn. (See Mississippi River Com-
mission Alluvial Valley Map, scale 1: 62,500.)
882     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Previous projects.-The River and Harbor Act of August 18, 1894,
authorized dredging at the mouth of Wolf River as an item in the
improvement of Memphis Harbor, the work being carried out under
the supervision of the Mississippi River Commission.
   Existing pwoject.-This provides for a channel 9 feet deep at low
water (71/ feet below zero on the Memphis gage) from its mouth to
North Second Street Road with bottom widths of 250 feet from the
mouth to Keel Avenue and 200 feet from Keel Avenue to North
Second Street Road, and thence 125 feet wide and 7.5 feet below
zero of the Memphis Beale Street gage from North Second Street
Road to Hindman Ferry Road.
   The estimate of cost for new work, revised in 1935, is $1,185,000.
The latest (1935) approved estimate of cost for annual maintenance
is $104,000.
   The work of improvement under the existing project up to Second
Street Bridge was authorized September 6, 1933, by the Public Works
Administration, and the existing project was adopted by the River
and Harbor Act approved August 30, 1935 (Rivers and Harbors
Committee Does. No. 26, 72d Cong., 1st sess., and No. 45, 74th Cong.,
1st sess.). Sketch maps are printed in the project documents.
   Local cooperation.-The work under the existing project is subject
to the condition that local interests shall furnish free of cost to the
United States all rights-of-way required for channel enlargement and
straightening, and suitable areas with retaining levees where needed
for disposal of dredged material during initial construction and
future maintenance as and when needed, and shall furnish assurance
satisfactory to the Secretary of War saving the United States free
from damages resulting from the work. The work is also subject to
the provision that no work shall be undertaken on any section of the
channel through or above any bridge until such bridge has been
altered in a manner satisfactory to the Secretary of War, without
cost to the United States. The conditions as pertaining to the im-
provement up to Second Street Bridge have been complied with.
Conditions above that point have not been complied with.
   Terminal facilities.-There are 19 terminals operating in the port
of Memphis, 5 being located on the Mississippi River front, 4 on
Tennessee Chute, and 10 on Wolf River.
   Operations and results during fiscal year.-The new work costs of
$20,876.85 and expenditures of $21,704.85 from Public Works funds
during the fiscal year were all in connection with remission to the
contractor, as was $31,255.58 of the maintenance costs and expendi-
tures from regular funds. The other maintenance costs of $28,836.75
and expenditures of $28,624.18 from regular funds cover 255,236
cubic yards of material removed from Memphis Harbor and Wolf
River by Government plant and hired labor during the fiscal year.
The length of channel dredged was 3,260 linear feet, of which 2,800
feet, 250 feet wide, and 460 feet. 200 feet wide, was completed.
   Total cost for the year was $80,969.18, of which $20,876.85 was for
new work and $60,092.33 for maintenance. The total expenditures
were $81,584.61.
   Condition at end of fiscal year.-At the end of the fiscal year there
was a channel 9 feet in depth and of project width to 800 feet above
Hall Street. From this point to beyond Second Street Bridge there
               RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT                                                    883

were depths of 1 to 2 feet during the low-water season. The work
remaining to be done to complete the project is extending the chan-
nel from North Second Street Road to Hindman Ferry Road, as
authorized by the River and Harbor Act of 1935.
   Exclusive of maintenance dredging done during the fiscal year 1936
with Mississippi River funds which were included in the annual
report of the Mississippi River Commission for that year under cap-
tion "Dredges and dredging", the total costs and expenditures for
new work to June 30, 1937, were $586,500, all from Public Works
funds. The maintenance costs were $60,092.33 and the expenditures
were $59,879.76, all from maintenance and improvement funds. To
cover the cost of retaining levees required of local interests, there
have also been costs and expenditures charged to contributed funds
amounting to $17,500.
   Proposed operations.-Of the balance unexpended at the end of
the year, $8;120.24, $5,000 was revoked on July 1, 1937. The remain-
ing balance of $3,120.24 together with $80,000 allotted from War
Department Appropriation Act of July 19, 1937, a total of $83,120.24,
will be expended during the fiscal year 1938 in maintenance dredg-
ing from the mouth of Wolf River to the Second Street Bridge.
   An additional sum of $100,000 can be profitably expended in the
fiscal year 1939 in maintenance dredging from the mouth of Wolf
River to the Second Street Bridge.
                                         Cost and financial summary
                                MAINTENANCE AND IMPROVEMENT                     UNDS

Cost of new work to June 30, 1937----
Cost of maintenance to June 30, 1937_-------------------                                            $60, 092. 33

      Total cost of permanent work to June 30, 1937__.__....                                           60, 092.33
Minus accounts payable June 30, 1937__-------   ____-----                                                  212. 57

     Net total expenditures-- -----         ---------------                                            59, 879. 76
Unexpended balance June 30, 1937--________-------__-----                                                8, 120. 24

          Total amount appropriated to June 30, 1937---------------                                    68, 000. 00


         Fiscal year ending June 30                     1933         1934        1935       1936           1937

         cotonewok
Cost of new  work ..... ---  ...------
                          .. -    .. ... ----------
                                           .. ....  ------------ ------------       ---------------------------
                                                                                            ..
Cost of maintenance.......-----------............------------   ------------ ----------- -----------     $60. 092. 33
'Total expended -------------           .--------                                                         59, 879. 76
Allotted--------------------------------------------------------                            $80, 000    -12, 000. 00


Balance unexpended July 1, 1936-----------------------------                                        $80, 000.00
Deducfions        on account of revocation of allotment                           __________ _         12, 000. 00

     Net amount to be accounted for__ __      .                                 __________- _  68, 000. 00
Gross amount expended                  -----                                           988.97
                                                                                  $-------------
                                                                                  $65,
Less reimbursements collected-----------------____                                  6, 109. 21
                                                                                                59, 879. 76
      Balance unexpended June 30, 1937                                                                  8, 120. 24
Outstanding liabilities June 30, 1937-------------                                                         212. 57
          Balance available June 30, 1937-----------                                    -    - --       7, 907. 67
884                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-- ---------------------------------                                                                                $80, 000. 00
             Balance available for fiscal year 1938------------------                                                                         87, 907. 67

Amount (estimated) required to be appropriated for completion
of existing project 1---------------------------------------                                                                              628, 000. 0°
Amount that can be profitably expended in fiscal year ending June
                                 - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1939, for maintenance 1                                                                                                               100, 000. 00
1
   Exclusive of available funds.
                                                            PUBLIC WORKS                      FUNDS

Cost of new work to June 30, 1937 _________--_____________                                                                                $586, 500. 00
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937--------                                                                           - 586, 500. 00,
Net total expenditures--_---___----           ____        ____                                                                         1586, 500.00
Total amount appropriated to June 30, 1937-------________-                                                                             1586, 500. 00


             Fiscal year ending June 30                                     1933                1934           1935               1936             1937

Cost of new work--------....-..                               ------............ $173, 782.83 $382, 934.01  $8, 906. 31                         $20, 876. 85
Cost of maintenance.......                              ------------ ----------         -----     --------- --- ----                             --- --
                   -.-
Total expended---...-...                    -..   --.....             _         .....       135, 410. 76   397, 601. 42      31, 782. 97         21, 704. 85

Allotted--.....-----.....----            --------------          ------------               603,000.00 -15,000.00           -1,500.00- .........


Balance unexpended July 1, 1936                                                                                                            $21, 704. 85
Gross amount expended __--.                                    __-----------__----$52,                                     960. 43
Less reimbursements collected                                      -----------------                                  31, 255. 58
                                                                                                                                              21, 704. 85
    1 In addition, $17,500 contributed funds expended for new work.

              CONSOLIDATED COST AND FINANCIAL SUMMARY FOR WOLF RIVER, TENN.

Cost of new work to June 30, 1937-.--                                                     ------------                -_---- -        1 $586, 500. 00
Cost of maintenance to June 30, 1937-------------------                                                                                       60, 092. 33
     Total cost of permanent work to June 30, 1937------------                                                                             646, 592. 33
Minus accounts payable June 30, 1937---- . -----------------                                                                                -- 212. 57
     Net total expenditures---------- ---------                                                             ____                   -1646, 379. 76
Unexpended balance June 30, 1937----_-------------                                                                               ------ 8, 120. 24

             Total amount appropriated to June 30, 1937-                                                   ---------                 -1 654, 500. 00

             Fiscal year ending June 30                                     1933                1934           1935               1936             1937

Cost of new work-------......-....                              ...._-..         -........ $173, 782. 83 $382, 934. 01       $8, 906. 31        $20, 876. 85
                     ..............-----------
Cost of maintenance----------------------                                  ............        ............--...............
                                                                                                             ------------------------ 60, 092. 33
         Total cost-......--------------------------...                                     173, 782. 83   382, 934. 01          8, 906. 31     '80, 969. 18
Total expended-..............                                ......              -_____-__135, 410. 76     397, 601.42       31, 782. 97         81, 584. 61
Allotted----------------------...................................-----............          603, 000. 00 -15, 000.00         78, 500.00         -12, 000. 00+

Balance unexpended July 1, 1936 ------------ __                                                             ____          _____           $101, 704. 85
Deductions on account of revocation of allotment- -                                                           - __--               ----     12, 000. 00

              Net amount to be accounted for.                                                    .------                                      89, 704. 85
    1 In addition, $17,500 contributed funds expended for new work.
                  RIVERS AND HARBORS-MEMPHIS,                                                        TENN., DISTRICT                                   885

Gross amount expended_----_____________------------------                                                    $118,949.40
Less reimbursements                           collected          -. ------               ----                    37, 364. 79
                                                                                                                                          $81, 584. 61

      Balance unexpended June 30, 1937----------------------                                                                                     8,120. 24
Outstanding liabilities June 30, 1937--------------    ------------                                                                                212. 57

     Balance available June 30, 1937 ----------------------                                                                                      7, 907. 67
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------                                                                                   80, 000. 00

     Balance available for fiscal year 1938_____------- -------                                                                              87, 907. 67
Amount (estimated) required to be appropriated         for completion
                                      _
    of existing project 2----------------______                                                             _____             _           628, 000. 00
Amount that can be profitably- -expended         in fiscal   year ending June
                                 -- - - - - - - - -    - -- - - - - - - - - - - - - - - - -
30, 1939, for maintenance 2                                                                                                              100, 000. 00
    2 Exclusive of available funds.

      8. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                              (GENERAL)

  The cost of work during the year amounted to $38,177.80; the
expenditures were $38,617.80. The balance unexpended, $82,083.34,
June 30, 1937, together with $11,700 allotted from War Department
Appropriation Act of July 19, 1937, a total of $93,783.34, will be
applied as needed during the fiscal year 1938 to payment of expenses
to be incurred under this heading. The additional sum of $40,000,
including $15,000 for work in the Little Rock district, can be profit-
ably expended during the fiscal year ending June 30, 1939.
                                                 Cost and financial summary
Cost of new work to June 30, 1937__
Cost of maintenance to June 30, 1937_                                                  -________------
                                                                                                                                         -$188, 093. 12
      Total cost of permanent work to June 30, 1937----------- 188, 093. 12
Minus accounts payable June 30, 1937---------------------------     921.11
     Net total expenditures _________ -_____________           187, 172. 01
Unexpended balance June 30, 1937-----------   ---------------- 82, 083. 34
            Total amount appropriated to June 30, 1937-------------- 269, 255. 35


            Fiscal year ending June 30                                   1933            1934                1935                 1936              1937


Cost of new work.......                  ..     ..     ..       ..       ..     ....        ..       ..     ..      ..   ..         ..      ..
Cost of maintenance-------------------.......................        $15, 874. 71      $7, 914. 08        $31, 520. 92    $71, 022. 10            $38, 177. 80
Total expended.........-----------------------                        15, 967. 14       7, 907. 59         30, 424. 14        70, 932. 44          38, 617. 80
Allotted......-----------------------------                           22, 984.84       18, 885. 51         31, 400. 00        68, 900. 00         102, 500. 00



Balance unexpended July 1, 1936---------------------------                                                                                $18, 201. 14
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934._._.. -     ___----____ $29, 500. 00
Amount allotted from War Department Appropriation
Act approved Apr. 9, 1935-------------------1----0, 500. 00
Amount allotted from War Department Appropriation
Act approved May 15, 1936----------------------62, 500. 00
                                                                                                                                          102, 500. 00
            Amount to be accounted for---- _--                                                   ---------                     _-         120, 701. 14
886           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended_                                                               $44,693.06
Less reimbursements collected_____________________                                     6,075. 26
                                                                                                          $38, 617. 80
      Balance unexpended June 30, 1937 _______________________ _                                            2,083. 34
Outstanding liabilities June 30, 1937-______________     $921. 11
Amount covered by uncompleted contracts                    64. 61
                                                                                                                  985. 72
    Balance available June 30, 1937 ______________ _____ -_                                                   81, 097. 62
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937____________________________________                                              275,     000. 00
    Balance available for fiscal year 1938______________________                                          156, 097.62
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1-_ ________                                                                      40, 000. 00
  1 Exclusive of available funds.
  2 Includes $63,300 for Little Rock district.

             9. PLANT ALLOTMENT FOR MEMPHIS, TENN., DISTRICT
                                       Cost and financial summary
Undistributed costs June 30, 1937________________________________                                         $96, 215. 73
Minus accounts payable June 30, 1937________________.._____                                                 2, 559. 41
     Net total expenditures______                                                                             93, 656. 32
Unexpended balance June 30, 1937_________________                                             ______          16, 092. 89

         Total amount appropriated to June 30, 1937                             ____________              109, 749. 21

         Fiscal year ending June 30                 1933             1934         1935            1936              1937


Total expended__--...   ____--------    ----    __-----     _-----            $100, 934. 85    $13, 252. 80      -$20, 531.33

Allotted--                                     _--------------------------.----113, 238. 96     16, 510. 25      -20, 000. 00


Balance unexpended July 1, 1936_______________________________                                            $15, 561. 56
Deductions on account of revocation of allotment_______________ -20, 000. 00
      Net amount to be accounted for _________________________      -4, 438. 44
Gross amount expended________________________         $12, 018. 40
Less reimbursements collected-----------------------32,    549. 73
                                                                   -20, 531. 33
      Balance unexpended June 30, 1937--_____
                                           ----          _____-_     16, 092. 89
Outstanding liabilities June 30, 1937_______________    $2,559. 41
Amount covered by uncompleted contracts ----------         385. 00
                                                                                                                 2, 944. 41
          Balance available June 30, 1937-____________-_____________                                          13, 148. 48

   10. ARKANSAS RIVER, ARKANSAS AND OKLAHOMA, EMERGENCY
                  RELIEF FOR FLOOD CONTROL

   With Emergency Relief funds, operations were continued during
the fiscal year in connection with Emergency Relief projects for
flood control levee construction at Arkansas City, Kans. (708 miles
above the mouth), and at Tulsa, Okla. (547 miles).
   The total estimated quantity of earthwork involved in the
Arkansas City project was 180,000 cubic yards and in the Tulsa
project, 440,000 cubic yards.
   The Arkansas City project has been completed. The total quantity
of earthwork involved in the completion was 188,837 cubic yards.
   The Tulsa project has been suspended indefinitely. The total
quantity of earthwork placed prior to suspension was 144,582 cubic
yards.
               RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT                                                                    887

  The projects were subject to the condition that local interests
furnish rights-of-way, as required, free of cost to the United States.
The condition as pertaining to the Arkansas City project was com-
plied with, and that pertaining to the Tulsa project was partially
complied with.
  The costs during the year for new work were $7,201.91 for the
Arkansas City project and $83,634 for the Tulsa project, a total
of $90,835.91.
  The expenditures were $6,398.82 for the Arkansas City project and
$87,375.15 for the Tulsa project, a total of $93,773.97.
  The unexpended and unobligated balance pertaining to the Tulsa
project, June 30, 1937, $1,773.53, is to be revoked in July 1937.
There is no balance pertaining to the Arkansas City project.
                                            Cost and financial summary
                                           LEVEES, ARKANSAS CITY, KANS.

Cost of new work to June 30, 1937______________________________                                                   $93, 152. 14
Cost of maintenance to June 30, 1937
          Total cost of permanent work to June 30, 1937___________                                                   93, 152. 14
Net total expenditures____________________________                                                                   93,152.14
Total amount appropriated to June 30, 1937 __________________                                                        93.152.14


          Fiscal year ending June 30                      1933        1934              1935           1936              1937


Cost of new work __-__-___ ______ _______--_..
                                           . ..                  _                          ..     $85, 950. 23         $7, 201. 91
                  ....---.--------
Cost of maintenance---------                                                          ---------                       ____------------
Total expended..
             ----------------------------              ____________   --- __                        86, 753. 32          6, 398. 82
Allotted_         ---------------------------------------------------------                         94,000.00            -847. 86


Balance unexpended July 1, 1936__________________--___-----                                                          $7, 246. 68
Deductions on account of revocation of allotment______________ _                                                         847. 86

      Net amount to be accounted for                                                                                    398.82
                                                                                                                      6_____________________-_
Gross amount expended_ _____          -----                                                    $7, 674. 88
Less reimbursements collected ___________                                                       1, 276. 06
                                                                                                                      6, 398. 82
                                           LEVEES,     TULSA COUNTY,         OKLA.


Cost of new work to June 30, 1937 ----------------------------                                                $191226.
                                                                                                               $191,   47
cost of maintenance to June 30, 1937__--

         Total cost of permanent work to June 30, 1937____________                                              191, 226. 47

Net total expenditures                          ________________                                                191, 226. 47
                                              _-----___
Unexpended balance June 30, 1937____________-------                                                                  1, 773. 53

         Total amount appropriated to June 30, 1937________________                                             193, 000. 00


          Fiscal year ending June 30                      1933        1934              1935           1936              1937


Cost of new work_           -   -   -_   _------   -       ---
                                                         --...        ----     ---.
                                                                                  ____..._$107,            592. 47     $83,  00
                                                                                                                          634.
Cost of maintenance .--------------------------------                                                 --                 --

Total expended          _       ___[ _      _                                                     1103, 851. 32         87, 375. 15

Allot..ted---..                                                                .--------           308,000.00 -115,000.00
888      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936---------------------------$204, 148.68
Deductions on account of revocation of allotment-- -------   115, 000. 00

      Net amount to be accounted for- _______--  -     -
                                                       -__     -     89, 148. 68
Gross amount expended    -------------------------- $90, 546. 18
Less reimbursements collected----------------------3, 171. 03
                                                                     87, 875. 15
      Balance unexpended June 30, 1937 ---                              1, 773. 53
                                                          _--_--_---------
                                                           __

11. MISSISSIPPI RIVER BASIN, TIPTONVILLE TO OBION RIVER, TENN.,
                        FLOOD CONTROL

   Location.-The works covered by this project are on the left bank
of the Mississippi River, between Tiptonville, Tenn., and the confluence
of the Obion and Mississippi Rivers. (See Mississippi River Com-
mission alluvial valley maps, scale 1: 62,500 and scale 1: 500,000.)
   Existing project.-This project is for the construction of a levee
to provide flood protection for the towns of Tiptonville, Ridgely,
and various smaller communities; and agricultural lands in Lake,
Obion, and Dyer Counties, Tenn. The estimated cost to the United
States is $730,000. The project was adopted by the Flood Control
Act approved June 22, 1936 (H. Doc. No. 188, 72d Cong., 1st sess.).
   Local cooperation.-See page 6. Progress is being made toward
the fulfillment of these requirements.
   Condition at end of fiscal year.-Constructionwork has not been
started. Definite project planning has been under way with funds
allotted under the Emergency Relief Act of 1936.
   Proposed operations.-The sum of $597,000, allotted during
October 1937, will be applied to the project.
   An additional allotment of $133,000 can be profitably expended
during the fiscal year 1939 for completion of the project.
                12. MEMPHIS, TENN., FLOOD CONTROL

  The Act approved August 28, 1937 (Public No. 406, 75th Congress),
authorized the construction of floodwalls, levees, and revetments
along Wolf River and Nonconnah Creek for the protection of Mem-
phis, Tenn., at an estimated construction cost of $9,000,000;
estimated cost of lands and damages $4,324,000. No work has been
done and no funds are available.
13. ARKANSAS RIVER BASIN (EXCLUSIVE OF CONCHAS RESERVOIR),
                      FLOOD CONTROL

  Location.-The flood-control improvements included in this project
are located on the main stem of the Arkansas River and on its tribu-
taries and are in the States of Arkansas, Oklahoma, Kansas, and
Colorado. More definite locations of individual items are given in
the following paragraph.
  Existing project.-The flood-control works of the existing project
were authorized for the following localities in the Arkansas River
Basin by the Flood Control Act approved June 22, 1936, and plans
of the majority of the projects are contained in House Document
No. 308, Seventy-fourth Congress, first session.
              RIVERS AND HARBORS--MEMPHIS,                                         TENN.,         DISTRICT                   889

                                            Estimated costs (act)               Present estimated costs Present indica-
                                                                                                          tions as to
                                                                                                                     whether re-
                  Project                                                                                           quirements of
                                                                                                                    local coopera-
                                            Construe-       Lands and            Construc-        Lands and          tion will be
                                              tion           damages               tion            damages           met by local
                                                                                                                       interests

ARKANSAS RIVER, MAIN STEM           AND
        MINOR TRIBUTARIES
°Caddoa Reservoir, in Bent County,          $9, 700, 000         $300, 000      $7,600,000        $5, 200,000       Probable.
   Colo., flood control and irrigation
   reservoir on the Arkansas River
   about 18 miles above Lamar.
Kaw, in Kay County, Okla., construc-           32, 500 I------------                 32, 500 -----------          No.
   tion of levee on right bank of Ar-
   kansas River.
Near Fort Gibson, in Muskogee                     7, 900              1,080           33, 600             2, 000    No.
   County, Okla., construction of lev-
   ees on left bank of Arkansas River.
Near Dardanelle, in Yell County,               93, 500              13, 500         103,000          11, 250       Yes.
   Ark., improvement of existing levees
   on the right bank of the Arkansas
   River.
Little Rock, Pulaski County, Ark.,            110, 500----------                    110, 500----------             Yes.
   construction of levees on the right
   bank of Arkansas River.
*North Little Rock, Pulaski County,            401, 000 ------------                 350,000 ----.------            Yes.
   Ark.; construction of levees and
  flood wall on left bank of Arkansas
   River.
From North Little Rock, Ark. to             2, 424, 400 ----------                2,424,400          250, 000       Yes.
   Gillett, Ark.; improvement of exist-
  ing levees on the left bank of Arkan-
  sas River.
West of Morrilton, in Pope and Con-           603, 000              53, 000         603,000          53, 000 1 Not known.
   way Counties, Ark.; improvement of
   existing levees on left bank of Arkan-
   sas River.
,Clarksville, in Johnson County, Ark.;          70, 000----------                            ............ Doubtful.
                                                                                      70, 000----------
   construction of levee on the right
   bank of Spadra Creek.
East of Bigelow, in Faulkner County,          100, 000 ------------                 100, 000         11, 000       Yes.
   Ark.; improvement of existing levees
   on left bank of Arkansas River.
Winfield, in Cowley County, Kans.;
   construction of levees and improve-
                                               108, 000    --          --------
                                                                      ............         -----I-----.
   ment of existing levees on Walnut
   River.
Augusta, in Butler County, Kans.;              109, 800              18, 600 ------------------
   construction of levees at junction of
   Walnut and Whitewater Rivers.
fHutchinson, in Reno County, Kans.;
  leveed floodway to north of Arkan-                             350, 000       11,1050,000 f      350, 000-       }Not at present.
                                            1,050, 000          1,350, 000                        1, 350,000
  sas River to divert Cow Creek.
"tichita and Valley Center, in Sedg-        2, 603,100       1, 597, 100         2, 603, 100       1, 597, 100      No.
  wick County, Kans.; levees, flood-
   way, and channel improvements on
  Arkansas River, Little Arkansas
   River, and Chisholm Creek.
1Big Slough to Belle Plaine, in Sedg-       1, 650, 200          232, 000         1, 650, 200        232, 000       No.
   wick and Sumner Counties, Kans.;
  levees along Arkansas and Nin-
  nescah Rivers and leveed floodway
   to divert Cowskin Creek.
        NORTH CANADIAN RIVER
Optima Reservoir, in Texas County,          1, 350, 000           180, 000        6, 500, 000        200, 000       Yes.
  Okla.; flood-control reservoir on the
  North Canadian River and south of
  the town of Optima.
Fort Supply Reservoir, in Woodward          2, 360, 000           225, 000      1 5,000, 000         457, 000       Yes.
  County, Okla.; flood-control reser-
  voir on Wolf Creek, a tributary of the
  North Canadian, about 12 miles west
 ,of Woodward.
        GRAND (NEOSHO) RIVER
Florence,in Marion County, Kans.;           17, 000 ----------............ 17,000 ..........-----------.. No.
levees on right bank of Cottonwood
  River, a tributary of the Grand
 (Neosho).
I Does not include $1,950,000 to be contributed by Oklahoma City, the additional construction cost for
municipal water supply.
890          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                               Estimated costs (act)                        Present estimated costs                 Present indica-
                                                                                       I        ~          -______________            tions as to
                                                                                                                                     whether re-
                 Project                                                                                                            quirements of
                                               Construc-           Lands and                Construc-        Lands and              local coopera-
                                                 tion                                                                                tion will be
                                                                    damages                   tion            damages                met by local
                                                                                                                                       interests
                                           i                 -I
GRAND (NEOSHO) RIVER-continued

Cottonwood Falls, in Chase County,                 7, 200                                       7, 200                             No.
  Kans.; levees on right bank of
   Cottonwood River.
Emporia, in Lyon County, Kans.;
  levees on left bank of Cottonwood
                                                   22, 700                                      22, 700     ----------- I No.
   River.
Neosho Rapids, in Lyon County,                     38, 900                                      38,900      ..........-             No.
   Kans.; levees on left bank of Grand
   (Neosho) River.
In Lyon County, Kans.; levees on                  237, 100                  38, 400            237, 100              38, 400        No.
  right bank of Grand (Neosho) River
  west of Neosho Rapids.
Hartford, in Lyon County, Kans.;
  levees on right bank of Grand
                                                   43, 200                                      43, 200    1..------                No.

   (Neosho) River.
Burlington, in Coffey County, Kans.;               27, 000                                      27, 000                             No.
  levees on right bank of Grand (Neo-
  sho) River.
Leroy, in Coffey County, Kans.;                     9, 600                                       9, 600                             No.
  levees on left bank of Grand (Neosho)
  River.
Neosho Falls, in Woodson County,                   32, 400                                      32, 400 I------                     No.
  Kans.; levees on right bank of Grand
   (Neosho) River.
Iola, in Allen County, Kans.; levees on            20, 700                                      29,300                    1, 500    Yes.
  left bank of Grand (Neosho) River.
Humboldt, in Allen County, Kans.;                  19,300                                       19,300                              No.
  levees on left bank of Grand (Neo-
  sho) River.
Chetopa, in Labette County, Kans.;                 28, 600                                      28, 600                             No.
  levees on right bank of Grand (Neo-
  sho) River.
In Cherokee County, Kans.; levees on              234, 000                  54, 000            234, 000              20, 000        No.
  left bank of the Grand (Neosho)
  River to the east of Chetopa.
           VERDIGRIS RIVER
Hulah Reservoir,     in Chautauqua             1,325, 000            1, 018, 000             1,325, 000        1,018, 000           Probable.
County, Kans.; and Osage County,
Okla.; flood-control and water sup-
ply reservoir on Caney River, a trib-
utary of the Verdigris.
West of Fredonia, in Wilson County,               189,900                   16, 900            189, 900              16, 900       1 No.
Kans.; construction of levees on left
bank of Fall River, a tributary of the
Verdigris.
West of Benedict, in Wilson County,               195, 000                  19, 700            195, 000              19, 700        No.
Kans.; construction of levees on right
bank of Verdigris River.
West of Elk City, in Montgomery                    81, 400                   8, 800             81, 400                   8, 800     No.
County, Kans.; construction of
levees on right bank of Elk River,
a tributary of the Verdigris River.
Caney Creek, Washington County,                   157, 600                  13, 300            157, 600                   7, 500     No.
Okla., and Chautauqua and Mont-
gomery Counties, Kans.: levees on
right bank of the creek, which flows
into Caney River, a tributary of
the Verdigris.
Verdigris River from mouth (in Okla-              231, 800                                     231, 800                             No.
homa) to Madison, Kans.; Clearing
banks and flood channel.
  SALT FORK OF THE ARKANSAS RIVER
Great Salt Plains Reservoir, in Alfalfa           972, 000                 261, 000          2, 500, 000           480, 000         Yes.
  County, Okla.; flnoidicontrol reser-
  voir on Salt Fork about 12 miles east
  of Cherokee.
Blackwell, in Kay County, Okla.;                   50,000         1-----------                   50,000
  construction of levees on right bank
  of the Chikaskia River, a tributary
  of the Salt Fork.
                                                     --   -i -      --       ---       -i                  -
                                                                                                           '-i~-


      Total estimated costs- -------____       26, 714, 300              5, 400, 380        33, 707, 300      10, 908, 650
                                           I
            RIVERS AND HARBORS-MEMPHIS, TENN., DISTRICT                                            891

  Local cooperation.-See page 6.
  Condition at end of fiscal year.-Definite project planning has been
under way with funds allotted under the Emergency Relief Act of
1936. With the exception of the following projects, no construction
work has been started:
  Winfield, Kans.-The project, essentially the same as that provided in the
Flood Control Act approved June 22, 1936, has been completed by the Kansas
Works Progress Administration.
  Augusta, Kans.-The project, essentially the same as that provided in the
Flood Control Act approved June 22, 1936, has been under construction for
several months by the Kansas Works Progress Administration.
  Verdigris River from mouth to Madison, Kans.-Considerable mileage was
cleared in Wilson County, Kans., by the Civil Works Administration in 1933
and 1934.
  Proposed operations.-The sum of $3,530,000 allotted for the fiscal
year ending June 30, 1938, will be applied to work on the following
projects:
Fort Supply Reservoir, Okla_____________________________                                  _ $1, 166, 000
Great    Salt Plains Reservoir,Okla__ _______________-------                                    104, 000
North Little Rock to Gillette, Ark., levees ___       _____                 __--1,              100, 000
                                  --------
North Little Rock, Ark., levees_______________                                                  350, 000
Little Rock, Ark., levees.                                                                      111, 000
Faulkner County, levee district No. 1, Arkansas, levees-------                                  158, 000
Near Dardenelle, Ark., levees------------------------------------                               166, 000
Iola, Kans., levees                                            --                                29,000
                -----
         a.,lve--------------------
        Total                                             ----------            -------      33,184,, 000

  The sum of $7,760,000 can be profitably expended during the fiscal
year ending June 30, 1939, for constructing the ' following projects:
Fort Supply Reservoir, Okla____________
                              --                          ________________-                 $2, 000, 000
North Little Rock to Gillett, Ark_.....                                                         520, 000
Caddoa Reservoir, Colo-_-__-------- ----------------------                                   2,600, 000
Great Salt Plains Reservoir, Okla--_                                            __            1,300, 000
Hulah Reservoir, Okla------ ----------------                                                 1, 340, 000

        Total          ______--------------------------------------------                    7, 760, 000
                        Cost and financial summary
Total amount appropriated to June 30, 1937___------------                                  ----------
Amount (estimated) required to be appropriated for completion
  of existing project _-              --_    ___                                           $30, 177, 300
Amount (estimated) required to be appropriated for completion
of that portion of existing project for which requirements of
local cooperation will be met________--------------------_                                 26, 645, 200
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work--             ---------------------                                  7,760, 000
1Exclusive of $3,530,000 allotted since June 30, 1937.
                    14. WHITE RIVER BASIN, FLOOD CONTROL
   Location.-The flood-control improvements included in this project
are located on the White River and its major tributaries in the States
of Missouri and Arkansas. More definite locations of individual
items are given in the following paragraph.
   Existing project.-The flood-control works of the existing project
were authorized for the following localities in the White River
Basin by the Flood Control Act approved June 22, 1936, and are
in accorldance with plans contained in Hoase Document No. 102,
Seventy-third Congress, first session.
892          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                      Estimated costs           Present estimated         Present in-
                                                           (act)                      costs               dications as
                                                                                                         to whether re-
                   Projects                                                                              quirements of
                                                   Construc-         and       Construe-       and       tion will be
                                                     tion                        tion                    met by local
                                                                  damages                    damages       interests

East Poplar Bluff and Poplar Bluff, in
  Butler County, Mo.; construction of
  leveed diversion floodway on east side
  of Black River_--___-- ---   ____   ___    _-   $546, 800       $209, 400      $546, 800   $209, 400   No.
Poplar Bluff, Mo., to latitude of Knobel,       1,972,000          632, 000     1,972, 000    632, 000   Missouri-
  Ark.; construction of leveed floodway on                                                                 no; Arkan-
  west side of Black River in Butler Coun-                                                                sas-yes.
  ty, Mo., and along Black River in Clay
  County, Ark.
Little Black River, in Butler and Ripley           754,900           65, 100      754, 900     65, 100   No.
  Counties, Mo., and in Clay and Ran-
  dolph Counties, Ark.; construction of
  levees on left bank of river.
Skaggs Ferry, in Randolph County, Ark.;             63, 000          17,100       100, 000     12, 000   Yes.
  construction of levees on the left bank of
  Black River east of Pocahontas.
Big Bottom, in Independence County,                128, 700          19,
                                                                       800        128,700      19,
                                                                                                 800     No.
  Ark.; construction of levee on left bank
  of White River near mouth of Black
  River.
Newport, in Jackson County, Ark.; en-              138,600           22, 500      287, 000     28, 000   Yes.
  largement of existing levees and flood
  wall on left bank of White River.
Village Creek, White River, and May-               931,500         222,300        783, 100     85, 000   Yes.
  berry District, in Jackson and Woodruff
  Counties, Ark.; construction of levees on
  left bank of White River below Newport.
Olarendon to Laconia Circle, in Monroe,         8, 960, 000         182, 000   8,960, 000     182, 000   No.
  Phillips, and Desha Counties, Ark.; con-
  struction of levees on left bank of White
  River.
Big Creek and L'Anguille River, in Lee              86,400           10, 800       86,400       5,000    No.
  County, Ark.; construction of levee on
right bank of L'Anguille River, a tribu-
  tary of St. Francis River, about 7 miles
  northwest of Marianna.
                                      13, 581, 900 1,381, 000
      Total estimated costs................                                    13,618, 900 1,238,300


   Local cooperation.-See page 6.
   Condition at end of fiscal year.-Definite project planning has been
under way with funds allotted under the Emergency Relief Act of
1936. Construction work has not been started.
   Proposed operations.-The sum of $787,000 allotted during the
fiscal year ending June 30, 1938, will be applied to work on the fol-
lowing projects:
         Skaggs Ferry, Ark_--                ------       --------------------------                        $100, 000
         Newport, Ark_-----------------                                                                      287, 000
         Village Creek, Ark----------   -------------                               --------------           400, 000

                  Total_ __---------------------                                                                787, 000

  The sum of $1,097,710 can be profitably expended during the fiscal
year ending June 30, 1939, for constructing the following projects:
         Village Creek, Ark --------------------------   ---------- $383,100
         Poplar Bluff, Mo. to latitude Knobel, Ark. (includes only
           Arkansas portion of project) ---------------------------  714, 610

                  Total----------------------------------------1,097,710
              RIVERS AND HARBORS--MEMPHIS, TENN., DISTRICT                                                                                                                             893
                                     Cost and financial summary
Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion
  of existing project-----------------------------------------1                                                                                                               $12, 832, 000
Amount (estimated) required to be appropriated for completion
  of that portion of existing project for which requirements of
  local cooperation will be met--------------------------------                                                                                                                 1,884, 710
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for new work ___________________ __-_______                                                                                                                    1, 097, 710
  1Exclusive of $787,000 allotted since June 30, 1937.
Status of reports called for by river and harbor acts and committee resolutions

                                           h                Date trans-                                                                                                       Recommenda-
         Locality              Authorization act             mitted to                                     Document no.                                                           tion
                                                             Congress

Arkansas River and           Flood Control      Act,    ----------
  Fourche Bayou in vi-         Feb. 8, 1936.
  cinity of Little Rock
  and North Little
  Rock (preliminary
  examination for flood
  control).
Arkansas River, Ark.,        River and HarborAct,
  and Okla.                    Aug. 30, 1935.             - - - - -      - -   - -

Arkansas River, Craw-        Flood Control Com-
  ford County Levee            mittee resolution,
  District, Ark. (flood        June 28, 1937.                 - -- - - - -
                                                             --
  control).
Arkansas River, Little       Flood Control Com-                                               -----------------------



  Rock to Pine Bluff,          mittee resolution,      ---- - --- - ---
  Ark.                         Mar. 19, 1937.
Arkansas River, Sequo-
  yah and Haskell
                             Flood Control Com-
                               mittee resolution,
                                                                                         ------------------------
  Counties, Okla. (flood       June 11, 1937.              --
                                                           - --- --- --
  control).
Big Mulberry Creek,          Flood Control Act,                                          ------------------------



  Crawford County,             May 6, 1936.
  Ark. (preliminary ex-
  amination for flood
  control).
Black River, Ark., and       River and Harbor Act,
  Mo.. and waterway to        Aug. 30, 1935.
  Mississippi River at
  or near Cape Girar-
  deau.
Cadron Creek, Ark.           Flood Control      Act,     May 10, 1937                         House, 250, 75th Cong.,                                                         Favorable.
  (preliminary examina-        May 6, 1936.                                                    1st sess.
  tion for flood control).
North Canadian River,        Flood Control Com- ................                         ........................

  N. Mex., Tex., and           mittee resolution,
  Okla. (flood control).       Apr. 2, 1936.
Petit Jean River, Ark.       Flood Control Act, .............-- ........................
  (preliminary examina-        May 6, 1936.
  tion for flood control).
Six Mile Creek, Logan        Flood Control      Act,
  County, Ark. (prelim-        June 20, 1936.             ..............                 ..    .   .   .   .   .   ...       .   .   .   .   .   .    ..             --   -




  inary examination for                                ...............
                                                   ...............
                                                                                     i
  flood control).
White River, Ark. and        Flood Control Com-                                          .....                 ........                          .         .......

  Mo. (flood control).         mittee resolution, ...............                        ..    .   .   .   .   .   . .   .       .   .               - - -       - - -

                               Feb. 3, 1937.
White River, Ark. and        Flood Control Com- ............... ......... ...       ........-
Mo., flood control of         mittee resolution,
Cache River.                  Apr. 14, 1937.
White River, Ark.......      River and Harbor Act,                 ........................
                               Aug. 30, 1935.
894      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

IMPROVEMENT OF RIVERS AND HIARBORS                          IN THE
          CONCHAS, N. MEX., DISTRICT
  This district comprises the watershed of the South Canadian River
and tributaries entering the same west of the Texas-New Mexico
State line.
  District engineer: Capt. Hans Kramer, Corps of Engineers.
  Division engineer: Brig. Gen. H. B. Ferguson, Corps of Engineers.
                    CONCIHAS   DAM   AND RESERVOIR

   Location.-The dam is located in San Miguel County, N. Mex., on
the South Canadian River approximatelj1/ mile downstream of the
confluence of the South Canadian and Conchas Rivers. It is ap-
proximately 30 miles northwest of Tucumcari, N. Mex., and 740 miles
above the mouth of the South Canadian River. The South Cana-
dian River has a total length of approximately 900 miles, rises in
the northeastern part of New Mexico, and flows south and east
to the Arkansas River in the vicinity of Webbers Falls, Okla. (See
U. S. Geological Survey State Map of New Mexico, scale 1: 500,000,
and U. S. Geological Survey topographic map, Tucumcari quad-
rangle, scale 1: 125,000.)
   Existing project.-The existing project provides for the construc-
tion of a flood-control dam and reservoir which may also be used for
irrigation and water-supply purposes. The dam will consist of a
concrete gravity main section 235 feet high and 1,250 feet long lo-
cated in the South Canadian River Canyon, together with earth dikes
on each side having an overall length of about 4 miles. The main
section will contain conduits located in its-base capable of releasing
water to maintain low water flow and for drainage of the reservoir,
and an overflow spillway 300 feet in length. The earth dikes will
be of varying heights up to 100 feet, and the north dike will contain
a concrete ogee type emergency spillway 3,000 feet long. The proj-
ect will involve about 750,000 cubic yards of concrete, 3,800,000 cubic
yards of fill, and 1,200,000 cubic yards of excavation. The latest
 (1937) estimated cost of new work is $15,530,000. The estimated
cost of lands and damages is $185,000.
   The project is based on the report on the South Canadian River,
N. Mex., Tex., and Okla., dated June 1, 1931, made in compliance
with House Document No. 308, Sixty-ninth Congress, first session,
and approved by the President, July 29, 1935, under the provisions
of the Emergency Relief Appropriation Act of 1935, and adopted
by Congress in the Flood Control Act of June 22, 1936 (H. Doc.
No. 308, 74th Cong., 1st sess.).
   Local cooperation.-The State of New Mexico or legal subdivision
thereof is required to furnish rights-of-way and to assume responsi-
bility for maintenance and operation of the completed structure, and
for any damages occurring to private property during construc-
tion. Assurance has been given to the Department that all condi-
tions will be complied with and steps to meet these obligations are
being taken. About 65 percent of the rights-of-way for a 27-mile
construction road to the site has been furnished by the State of New
Mexico. The acquisition of 18,160.03 acres of rights-of-way, in-
cluding the remaining right-of-way for the construction road, has
been completed by the United States, and payment in full therefor
       RIVERS AND HARBORS-CONCHAS, N. MEX., DISTRICT             895
was made on June 23, 1936, in the amount of $165,000. The legis-
lature of the State of New Mexico has authorized the repurchase
of these rights-of-way from the United States. The remaining
unacquired rights-of-way for this project are being procured by
the State of New Mexico.
   Terminal facilities.-None.
            OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-Excavation for main dam was continued by hired
labor until October 31, 1936. A continuing contract for the con-
struction of the main dam and wing dams was entered into Septem-
ber 18, 1936. At the end of the fiscal year all preliminary work
had been completed. Cofferdam number one has been constructed and
unwatered and 54,048 cubic yards of concrete placed. Contract was
12.8 percent complete on June 30, 1937. Construction of the north
dikes and the excavation for the emergency spillway was commenced
on December 14, 1936, by hired labor and carried to substantial
completion.    Surveys, explorations, and designs were continued.
The costs during the fiscal year were $1,887,117.74 for new work
and $76,108.20 for maintenance, a total of $1,963,225.94. The total
expenditures were $2,457,079.01.
   Emergency relief funds.-A construction camp at the site of the
work large enough to house a population of approximately 2,500
was completed by hired labor. Surveys, explorations, and designs
were continued. The costs during the fiscal year were $646,641.93
for new work and minus $866.24 for maintenance, a total of $645,-
775.69. The total expenditures were $330,744.77.
   The costs during the fiscal year for all funds were $2,533,759.67
for new work and $75,241.96 for maintenance, a total of $2,609,-
001.63. The total expenditures were $2,787,823.78.
                  CONDITION AT END OF FISCAL YEAR

   The construction camp at the site of the works and the construc-
tion road have been completed. The construction of north dikes
and the excavation for the emergency spillway are substantially
complete. The main dam and wing dams are 12.8 percent complete.
Surveys, explorations, and design are substantially complete. Con-
struction of the project as a whole is approximately 20 percent
complete.
   The work remaining to be done to complete the project consists
of the completion of design of the emergency spillway and irriga-
tion headworks; completion of the construction of the main dam and
wing dams, north dikes; and construction of the emergency spillway,
south dike and irrigation headworks.
   The total costs to the end of the fiscal year, regular funds, were
$1,887,117.74 for new work and $76,108.20 for maintenance, a total
of $1,963,225.94. The total expenditures were $2,457,079.01.
   The total costs to the end of the fiscal year, emergency relief
funds, were $2,114,715.11 for new work and $284.89 for maintenance,
a total of $2,115,000. The total expenditures were $2,269,003.96.
   The total costs to the end of the fiscal year for all funds were
$4,001,832.85 for new work and $76,393.09 for maintenance, a total of
$4,078,225.94. The total expenditures were $4,726.082.97.
      20196--37--pt. 1----57
896           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                             PROPOSED OPERATIONS

   The unexpended balance including accounts receivable, amounting
to $1,279,293.31 at the end of the fiscal year, together with allot-
ments made during August 1937, of $4,000,000 from the Flood Con-
trol Act of 1937 and $1,000,000 from the Emergency Relief Act of
1937, a total of $6,279,293.31, will be applied as follows:
                                 REGULAR   FUNDS


Accounts payable June 30, 1937                       __-------_  * $211, 569. 30
New work:
    Continue construction main dam and wing dams by continu-
     ing contract (July 1937 to June 1938) ---------------- 3, 849, 346. 61
    Construction of south dike by hired labor (July 1937 to
     June 1938) ------------------------------------                750, 000. 00
    Construction of irrigation headworks-preliminary excava-
     tion by hired labor (December 1937 to June 1938)--------        60, 000. 00
    Construction of emergency spillway-processing of aggre-
     gates by hired labor (January 1938 to June 1938)--------        95, 000. 00
    Completion of north dikes and excavation for emergency
     spillway by hired labor (July 1937 to July 20. 1937) ......     17. 000. 00
   Design of emergency spillway, design revisions for other con-
     tracts and investigations (July 1937 to June 1938) .......      88, 000.00
        Total new work__---
                       ........    --------------      __ -        5, 070, 915. 91
Maintenance; Maintenance of construction road by hired labor
 (July 1937 to June 1938)----------------------------------            30, 000. 00
      Total    for regular funds-----------------------------5,       100, 915. 91

                            EMERGENCY RELIEF FUNDS

Accounts payable June 30, 1937_                                        13, 377. 40
New work:
    Continue construction of main dam and wing dams by con-
      tinuing contract (July 1937 to June 1938)                       165, 000. 00
    Construction of south dike by hired labor (July 1937 to June
     1938)----------------------------------------                    480, 000. 00
    Construction of irrigation headworks-preliminary excava-
      tion by hired labor (December 1937 to June 1938)-                40, 000. 00
    Construction of emergency spillway-processing of aggre-
      gates by hired labor (January 1938 to June 1938)-------          65, 000. 00
        Total new work ------------------------------------           763, 377. 40
Maintenance: Maintenance of construction road by hired labor
  (July 1937 to June 1938) ----------------------------------          10, 000. 00
Unallocated balance--------------------------------------             405, 000. 00
      Total for emergency relief funds----------------------       1, 178, 377. 40
      Total for all work--------------------------------- 6, 279, 293. 31
  The additional sum of $4,750,000 can be profitably expended during
the fiscal year 1939 as follows:
New work:
   Complete construction of main dam and wing dams by continu-
     ing contract----------______________
                                ------------------------------      $2, 600, 000
   Complete construction of south dike_ -----------------------      1, 000, 000
   Complete construction of irrigation headworks   ----------------     500, 000
   Complete construction of emergency spillway                 __ _     625, 000
      Total new work-----------------                                  4, 725, 000
Maintenance: Maintenance of construction road-------------------           25, 000
      Total for all work --------------                                4, 750, 000
                RIVERS AND HARBORS-CONCHAS,                                                                   N. MEX., DISTRICT                                    897

  With this expenditure of funds it is expected that the project will
be 100 percent complete at the end of the fiscal year 1939.
                                                          Cost and financial summary
                                          MAINTENANCE                        AND IMPROVEMENT                               FUNDS


Cost of new work to June 30, 1937---------------------------   $1, 887, 117. 74
Cost of maintenance to June 30, 1937_-------------------------      76,108. 20

      Total cost of permanent work to June 30, 1937---------                                                                                         1, 963, 225. 94
Undistributed costs June 30, 1937------------------------------                                                                                         647, 427. 45

      Net total cost to June 30, 1937 _____________________----2, 610, 653. 39
Plus accounts receivable June 30, 1937-------------------------    57, 994. 92

      Gross total costs to June 30, 1937_-___ ---_____-----                                                                                          2, 668, 648. 31
Minus accounts payable June 30, 1937--------------                                                                                          __       -211, 569. 30

     Net total expenditures--------------------------------2,                                                                                           457, 079. 01
Unexpended balance June 30, 1937 ---------------------                                                                                               1, 042, 920. 99

            Total amount appropriated to June 30, 1937-_- ___                                                                        _____           3, 500, 000. 00

     Fiscal year ending June 30                                 1933                          1934                1935                       1936               1937


Cost of new work ..--             -.                 -.                           -                      -----------         ------......                  $1, 887, 117. 74
Cost of maintenance...                   _            _______
                                                __.......                  ____           _    ____                -_________-
                                                                                                                  -__ _____                      ___- __        76, 108. 20

         Total cost-.....__..--        ---------------                       ..------------------.----        -1,963,225.                           -..                 94

                           --------------
Total expended----............                              .                ----------               -------------- -------------- 2, 457, 079. 01
Allotted------------------------................           --..                            ......
                                                                            -------------- ------------- $3, 500, 000. 00                                  ..


Balance unexpended July 1, 1936----------------------------      $3, 500, 000. 00
Gross amount expended______________________     $2, 638, 292.06
Less:
    Reimbursements collected .-   $180, 237. 57                              -
    Receipts from sales                 975. 48
                                                    181, 213. 05
                                                                  2, 457, 079. 01
      Balance unexpended June 30, 1937 _____________________                                                                                         1, 042, 920. 99
Outstanding liabilities June 30, 1937___ _________$211, 569.30
Amount covered by uncompleted contracts---.---- 831, 351. 69
                                                                                                                                                     1, 042, 920. 99
     Balance available June 30, 1937-------------------
Accounts receivable June 30, 1937_________________________ _                                                                                               57, 994. 92
     Unobligated balance available June 30, 1937__-    -
                                                      ________
                                                           --                                                                                              57, 994. 92
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------ ------------------------                                                                                         4, 000, 000. 00
            Balance available for fiscal year 1938_-- ____-______
                                                      --                                                                                             4, 057, 994. 92
Amount (estimated) required to be appropriated for completion
of existing project -- __---_--    -------                 -1 4, 750, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:    - --
   For new work 1____   __________ ______________                                                                                                    4, 725, 000. 00
   For maintenance ,---------          ----------                                                                                                      - 25, 000.00

             Total '    --------                                       -              -        -          -            -       -            -        4. 750, 000. 00
    1Exclusive    of available funds.
898                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                 EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937--    --------------------  $2, 114. 715.11
Cost of maintenance to- June 30, 1937--------------------------       284. 89
      Total cost of permanent work to June 30, 1937---------- 2,115, 000. 00
Plus accounts receivable June 30, 1937-- ---------------------  167, 381. 36
     Gross total costs to June 30, 1937--------------------                                                      2, 282, 381. 36
Minus accounts payable June 30, 1937---- --------------------                                                        13, 377.40
      Net total expenditures-----------------------------                                                        2, 269, 003. 96
Unexpended balance June 30, 1937 --------------------------                                                          0, 996. 04
            Total amount appropriated to June 30, 1937-----------2, 280, 000. 00

    Fiscal year ending June 30                     1933               1934           1935                1936              1937


Cost of new work-----------------...                       -------------- -------------- $1, 468,073. 18                 $646, 641. 93
Cost of maintenance.----...--                _--------_-----_            -              ---------        1, 151. 13         -866. 24

        Total cost----------------        -------------
                 ................------...........                           -------------          1,469, 224. 31        645, 775.69

Total expended.........-----------------     --------------     ----------   ---------              1,938,259.19          330, 744.77

Allotted------------............--          -------------- -------------- --------------            2, 280,000. 00


Balance unexpended July 1, 1936 ________________                                                                      $341, 740. 81
Gross amount expended__-----       ---
                                   ________ --       -   $990,775. 86
Less :
    Reimbursements collected--------      $657,262. 89
    Receipts from sales_____      ___..        2, 768.20
                                                          660, 031. 09
                                                                                                                       330, 744. 77

      Balance unexpended June 30, 1937 ----------------------       10, 996. 04
Outstanding liabilities June 30, 1937 -   -                   -
                                                 -__________-______ 13, 377. 40
     Balance available June 30, 1937_ _______                                         ______            __       --      2, 381. 36
Accounts receivable June 30, 1937---167,                                                                                    381. 36

     Unobligated balance available June 30, 1937____- __-_ --   - 165, 000. 00
Amount allotted from Emergency Relief Appropriation Act ap-
proved June 29, 1937----   ----------------------    --------- 1, 000, 000. 00
            Balance available for fiscal year 1938__--_ -                               -------                  1, 165, 000. 00

                 CONSOLIDATED              COST AND FINANCIAL SUMMARY FOR CONCHAS                               DAM


Cost of new work to June 30, 1937_     -___--_____    _________ $4, 001, 832. 85
Cost of maintenance to June 30, 1937 ... ___-__-_____        --
                                                         - ____      76, 393. 09
      Total cost of permanent work to June 30, 1937-----------                                                   4, 078, 225. 94
Undistributed costs June 30, 1937   __       ______                                                                 647, 427. 45
      Net total cost to June 30, 1937_________- -- _________                                                     4, 725, 653. 39
Plus accounts receivable June 30, 1937_   -____-_______--                                                       -__ 225, 376. 28

                                                 -__
      Gross total costs to June 30, 1937 ___ -- __-                                                  -__--       4, 951, 029. 67
Minus accounts payable June 30, 1937_____________ -                                             _____-              224, 946. 70

     Net total expenditures---    ---------------------------                                                    4, 726, 082. 97
Unexpended balance June 30, 1937---- ____---__--.__-.                                                            1, 053, 917. 03
            Total amount appropriated to June 30, 1937 ---                                      ___-__           5, 780, 000. 00
                RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                                         899

    Fiscal year ending June 30                      1933                 1934               1935              1936              1937


Cost of new work-------             ------....--        -------               --       ----------       $1, 468, 073. 18    $2, 533, 759. 67
                                          ... _---___
Cost of maintenance----------- _----------__                                            -
                                                                                       __     ..              1, 151. 13        75, 241. 96
                                  --------------
      Total cost------...............                             -----------       -------------- 1, 469, 224. 31           2, 609, 001. 63
Total expended--        ----              __ _........... .        __ ___
                                                                      .__..     ....._ _      ..___   . 1, 938, 259. 19      2, 787, 823. 78
Allotted........------------               -------------- -------------- --------------                  5, 780, 000. 00 -------......


Balance unexpended July 1, 1936 _____                    _______    $3, 841, 740. 81
Gross amount expended ---------                 __ $3, 629, 068. 48
Less reimbursement collected-------- $837, 501. 02
Less receipts from sales-__ ______3,       743. 68
                                                       841, 244. 70
                                                                     2, 787, 823. 78

      Balance unexpended June 30, 1937_                                                                               1, 053, 917. 03
Outstanding liabilities June 30, 1937---   __--$224, 946. 70
Amount covered by uncompleted contracts--------  831,351. 69
                                                                                                                      1, 056, 298. 39

     Balance available June 30, 1937 -------------                                                                         -2, 381. 36
Accounts receivable June 30, 1937---------------------------                                                               225, 376. 28

    Unobligated balance available June 30, 1937--------------                                                              222, 994. 92
Amount allotted from War Department Civil Appropriation
   Act approved July 19, 1937------------                                                                            4, 000, 000. 00
Amount allotted from Emergency Relief Appropriation                                                         Act
approved June 29, 1937---------------------------                                                                    1, 000, 000. 00
     Balance available for fiscal year 1938------                                                                     5, 222, 994. 92
Amount (estimated) required to be appropriated for completion
                                                                    - - -- - - - - - - - - - - - - -
of existing project 1- - - - - - - - - - - - - - - - - - - - - - -                                                   4, 750, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939: 1- - - - - - - - - - - -
                                         - - - - - - - - - - -- - --  - - - - --
   For new work                                                      _----
                               - --- -- -- -- --- --- -- --- -- --- --- --- -- ---
                                                                                   4, 725, 000. 00
   For maintenance 1 -- - -                                                            25, 000. 00
       Total 1- - - - - - - - - - - - - - - -        --- -- --                                 -      -- --- -
                                                                                                                      4, 750, 000. 00
   1 Exclusive of available funds.

    IMPROVEMENT OF RIVERS AND HARBORS IN THE
             ST. LOUIS, MO., DISTRICT
   This district includes the Mississippi River between the Ohio River
and Clarksville, Mo., and for compliance with provisions of the
Flood Control Act of June 22, 1936, includes the Mississippi River
between Cape Girardeau, Mo., and Clarksville, Mo., on the right
bank, and between Thebes, Ill., and Hamburg, Bay, Ill., on the left
bank, and Illinois River between the mouth and Havana, Ill. That
section of Mississippi River between Missouri River and Clarksville
is included in the report of Mississippi River between Missouri River
and Minneapolis, Minn.
   District Engineer: Lt. Col. P. S. Reinecke, Corps of Engineers.
   Division Engineer: Col. J. N. Hodges, Corps of Engineers.
900       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                 IMPROVEMENTS

                                   Page                                         Page
1. Mississippi River between the           4. Examinations, surveys, and
     Ohio and Missouri Rivers _      900         contingencies (general) .- -   911
2. Mississippi River between the                                  -912
                                           5. Plant allotment-_ ___-
     Missouri River and Clarks-            6. Upper Mississippi River Val-
     ville, Mo __________-      -907             ley, flood control----------   912
3. Removing snags and wrecks               7. Illinois and Des Plaines River
    from the Mississippi River                    Basin, flood control--        914
     below the mouth of the Mis-
    souri River, and from Old
     and Atchafalaya Rivers _.       907

I. MISSISSIPPI RIVER BETWEEN THE OHIO AND MISSOURI RIVERS

   Location.-The Mississippi River rises in Lake Itasca, Minn., flows
in a southerly direction 2,440 miles, and empties into the Gulf of
Mexico. The portion included in this report embraces the 195-mile
section known as the middle Mississippi, between the tributary Ohio
and Missouri Rivers, 1,078 to 1,273 miles from the Gulf.
   Previous projects.-The original project for the improvement of
the Mississippi River between the Ohio and Missouri Rivers was
recommended by a Board of Engineers in a report dated April 13,
1872, and concurred in by the Chief of Engineers. The cost and
expenditures for the middle Mississippi prior to the adoption of the
present project in 1881 were $1,610,000 for new work.
   (For further details see p. 1879 of the Annual Report for 1915.)
   Existing project.-This provides for obtaining and maintaining a
minimum channel depth of not less than 9 feet, a minimum width of
not less than 300 feet at low water, with additional width in bends
from the mouth of the Ohio River (1,078 miles from the Gulf) to the
northern boundary of the city of St. Louis, 191 miles; thence 200
feet wide, with additional width in bends to the mouth of the Mis-
souri River, 4 miles, all to be obtained by regulating works and
dredging.
   First, by regulating works, for closing sloughs and .secondary
channels, and narrowing the river; by building new banks where the
natural width is excessive and protecting new and old banks from
erosion where necessary to secure permanency.
   Second, by dredging or other temporary expedients to maintain
channels of project dimensions.
   The project for regulating works was adopted in 1881 (Annual
Report, 1881, p. 1536). Dredging was introduced as a part of the
project by the River and Harbor Acts of June 3, 1896, June 13, 1902,
March 2, 1907, and September 22, 1922, the latter of which provides
for dredging channels to landing places on the main river and sub-
sidiary sloughs for the river above the mouth of the Missouri River.
That part of the project for the middle Mississippi which proposed
regulating works was practically abrogated by acts of March 3, 1905,
March 2, 1907, and the joint resolution of June 29, 1906. The River
and Harbor Act of June 25, 1910, restored regulating works to the
project and began appropriations with a view to the completion of
the improvement between the Ohio and Misouri Rivers within 12
years, at an estimated cost of $21,000,000, exclusive of amounts pre-
viously expended (H. Doc. No. 50, with accompanying atlas, 61st
                  RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                                    901
Cong., 1st sess.; and H. Doc. No. 168, 58th Cong., 2d sess.). The
River and Harbor Act of January 21, 1927, provided for a depth of
9 feet and width of 300 feet from the Ohio River to the northern
boundary of St. Louis and increased the estimate for maintenance to
$900,000 annually (Rivers and Harbors Committee Doec. No. 9, 69th
Cong., 2d sess.). The River and Harbor Act of July 3, 1930, modi-
fied the project between the northern boundary of the city of St.
Louis and Grafton (mouth of Illinois River) to provide for a
channel 9 feet deep and generally 200 feet wide with additional
width around bends, at an estimated cost of $1,500,000, with $125,000
annually for maintenance (Rivers and Harbors Committee Doc. No.
12, 70th Cong., 1st sess.).
   The estimated cost of new work, revised in 1934, is $43,000,000,
with $1,300,000 for annual maintenance.
   Terminal facilities.-The water terminal and transfer facilities of
the district are fully described as of December 31, 1918, in House
Document No. 652, Sixty-sixth Congress, second session, pages 1211-
1239. Additional data for terminal facilities is also contained in
Transportation Series No. 2, 1929, Transportation in the Mississippi
and Ohio Valleys.
   Operations and results during fiscal year.-River stages were fa-
vorable to construction work, which was carried on extensively by
hired labor with Government plant and by contract during the fall of
1936; river conditions were generally unfavorable during the spring
of 1937 and work was carried on only intermittently. Regulating
works were maintained and project dimensions of channel were se-
cured by dredging. The district's standard specifications for con-
struction work were used. Location, quantities, and costs of open
river regulating works follow:

                                                                                  Miles                   Dikes (hurdles)
                                                                                  above
                         Class of work and locality                               mouth
                                                                                  of Ohio     Number         Linear              st
                                                                                  River                       feet

New work by contract:
   Hurricane Field-Cairo Protection------------------------                          8                7        5,    000   $131, 899.14
   Powers Island-Goose Island ..----------------------------                        36                9        3,    830     84, 016. 35
   Devils Island-Schenimann .-----------------------------                          60                8        6,    985    155, 404. 88
   Willard-Hanging Dog Island-______-___-___                 -          -____       69                7        3,    910     83, 440. 50
   Wilkinson ----------------------------------------------                         87                6        2,    030     40, 702. 72
   Seventy six-Crain Island .....                 ....      .....-------------------------------
                                                                                    97         (1)             (1)            6, 572.32
   Liberty. _ ---------------------------------------                              100                8        4, 020        90, 931. 55
   Crain Island           -______    _____ _--______ ___              __-          106                4        2, 020        46, 629. 05
   Chester ____________ ___________ _____-._______          __.. . _               114                1           750        72, 372. 63
   Kaskaskia Island-Chester -----------------------------                          115                5        2, 345        72, 391. 09
   Kaskaskia Island-Ste. Genevieve.------------------------                        116         (1)             (1)           21, 669. 60
   Calico Island-.... ..............            ...........                        150               11        7. 500       136, 511. 09
   Calico Island-Sulphur Springs            _      --------                        155                1           450        22, 010. 62
       Total--------------------------------------------                            -                67       38,840        964,551.54
New work by United States plant and hired labor:
   Thebes Reach-- _____-_____----________               -              -_____--          43          21              740     66, 655. 80
   Horsetail, East-------------------------------------                                 170           2              960     21, 891. 06
       Total ................-------------------------------------------...        ----------         3        1, 700        88, 546.86
Maintenance by United States plant and hired labor__-----                  ---------- ----------              12, 820       302, 215. 76

  1 Reported fiscal year 1936.
  2 Solid dike, brush and stone.
902           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                            Bank protection (revetments)
                                                 Miles
                                                above
       Class of work and locality               mouth                       Linear            Squares (100 square
                                                of OhioNumber              feet bank                     feet)             Costs
                                                 River                     protec-                                         C
                                                                             tion             Mattress       Paving

New work by contract:
   Dogtooth Bend__-----------             --- _         23   (1)                 (1)              (1)               854   $55, 133. 09
   Cape Girardeau_.-- ---       __-__-       -    -     50   (1)                 (1)             (1)             (1)           124.10
   Devils Island-------__---___--               -       60           1           4, 390           4, 382         2, 229    98, 883. 17
   Wilkinson_--                                         92   (1)                 (1)              (1)            (1)            73. 14
   Liberty Bend_-----------------__                    100   (1)                 (1)             (1)                 67    10; 887. 74
   Kaskaskia Island-----115                                  (1)                 (1)             (1)             (1)        7, 268. 51
   Cornice Island__-- ---------        ______          150           1           1, 435           1, 429            828    44, 470. 55
   Pulltight......-------------------------            158   (1)                 (1)             (1)                670    25, 686. 61
   Sawyer Bend_--------.
                   __           ---               -____187           1              850                281          404    17, 868. 26

      Total -------------------- ___--___        __    ___           3           6,675           6,092           5,052    260,395.17
Maintenance by United States plant
and hired labor_..             -..---                 ---         -- _-    --           --      2, 877          2, 652   155, 135. 17


1 Reported fiscal year 1936.

  Regular funds.-The following new work was done with regular
funds by hired labor with Government plant: Three dikes totaling
1,700 feet in length at a cost of $88,546.86. Sixty-five dikes totaling
37,640 feet in length were built under contract at a cost of $841,926.37.
One revetment totaling 4,390 feet in length, consisting of 4,382 squares
of mattress and 2,229 squares of paving, was built under contract
at a cost of $98,883.17. In addition to completed work there were
under construction, by contract, 13 dikes to total 5,915 linear feet.
The total cost of new work with regular funds was $1,029,356.40.
   The following maintenance work was conducted with regular
funds. The required 9-foot channel was maintained, except for
short periods needed to move a dredge to the shoal, by six United
States dredges. During the year 68 shoals developed of which 51
were dredged once, 14 were dredged twice, 1 was dredged three times,
1 was dredged four times, and 1 was dredged five times. There were
8,921,980 cubic yards of sand and gravel removed by these dredges
from channels through 68 bars, and 1,274,840 cubic yards of material
removed in outside-the-channel dredging, 579,765 cubic yards of
which was done for the Missouri Pacific Railroad at Little Rock
Landing, Mo., for which the district was reimbursed. The channels
dredged had a combined length of 41.8 miles, an average width of
280 feet and an average gain in depth of 3.9 feet. The total cost of
dredging was $563,403.40, all charged to maintenance.
  Hydrographic surveys were made covering 293 miles of river,
costing $88,217.65. Other miscellaneous costs were: Snagging, $16,-
176.73; aids to navigation, $13,894.63; model tests, $71,354.70; and
mooring piles $7,016.05, all charged to maintenance. The total cost
of all maintenance was $1,217,414.09.
  Emergency Relief funds--New woorkc.-The following work was
done under contract: Two dikes totaling 1,200 feet in length were
built at a cost of $122,625.17; two revetments totaling 2,285 feet in
length, consisting of 1,710 squares of mattress and 2,823 squares of
pavming, were built at a cost of $161,512. In addition to completed
                      RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                                                 903
work there is under construction, by contract, one uncompleted re-
vetment to total about 2,200 feet, to be paid for with Emergency
Relief funds. The total cost, Emergency Relief funds, was $284,-
137.17, all new work.
  The costs and expenditures during the fiscal year were as follows:

                                                                                                Costs
                    Kind of funds                                                                                                    Expenditures
                                                                    New work            Maintenance                Total

Regular_-------........       ......-
                             ------..                           $1,029, 356.40           $1, 217, 414.09        $2, 246,770.49         $2, 232,503.32
Emergency Relief-___----............                            -     284, 137. 17--.-.---------.-                 284, 137. 17               306, 566. 55

         Total. ............-..-..........                          1, 313, 493.57        1, 217, 414.09         2, 530, 907.66             2,539, 069.87



  Condition at end of fiRcal year.-Open river regulating works are
about 70 percent completed. The quantities required to complete the
project are virtually the same as estimated in last annual report (120
dikes, 90,000 linear feet, and 50 revetments, 263,000 linear feet) inas-
much as practically all the work done during the fiscal year was in
replacement of work damaged or destroyed by ice in the spring of
1936. Dikes and revetments are now in very good repair and the
channel has been greatly improved by the work that has been done.
Dredging is required at low stages to remove temporary shoals and
maintain the required channel depths.
  In recent years, notwithstanding the unusual low water that has
prevailed, the project dimensions of channels have generally been
maintained throughout the navigation season. The navigation season
usually lasts from the middle of February to the middle of Decem-
ber, the river being generally closed by ice the remainder of the
year. The river is generally above the 10-foot stage, St. Louis gage,
for 6 months of the year, latter part of February to latter part of
August, during which time project channel depths generally prevail
without dredging.
  The following table gives condition of the channel during the fiscal
year 1937:

                                                                     Afford-                       Afford-                 Proposed Control-
                                                    Length          ing less         Period       ing more       Period      low-     ling
                                                   of section        than 9                         than 9                  water
                                                                      feet                           feet                   width   depth

Mouth of Ohio to Commercial                         Miles            Miles           Days            Miles        Days            Feet           Feet
  Point      -_
           ____   -__ ________--
                       -                            - 32. 0             1.2             45             31.0         230            2, 000            7
Commercial Point to Commerce_                          7. 7              .8             16              6. 4        259            2, 500            6
Commerce to Grays Point_..                             6. 5              .6             19              6.3         256            2, 085            6
Grays Point to Grand Tower .                          33. 5             6. 1            51             27.4         224            2, 250            5
Grand Tower to Fort Gage ....                         36. 3             2. 6            71             33. 6        204            2, 250            6
Fort Gage to Little Rock ._._                          9. 5             3. 0            37              6. 5        238            2, 250            55
Little Rock to River Des Peres                        46. 5             5. 8            63             40. 7        212            2, 250            5
River Des Peres to northern
  boundary, city of St. Louis                -..        19. 2             7. 9             81           11. 1        194           1, 700             5%
Northern boundary to mouth
  of Missouri River            ------------              3.8              1.7              64            2.4         213           2, 250             6i


  1 Lowest stages known during navigation season, occured in fall 1936.
904             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The costs and expenditures under the existing project to June 30,
1937, have been as follows:

                                                                            Costs
                Kind of funds                                                                                    Expenditures
                                                   New work           Maintenance               Total

Regular--- ----------------------                $26, 526, 036. 68     $19, 776, 745.93    $46, 302, 782. 61      $46, 193, 169. 57
Public Works__ _           ---------------         3, 462, 154. 46 ----------------          3, 462, 154.46         3, 462, 154. 46
Emergency Relief.....----....--------------...--      948, 632. 38 ----------------             948, 632. 38           945, 793. 38

       Total_         .---------------------      30, 936, 823. 52     19, 776, 745.93      50, 713, 569. 45       50, 601,117. 41



  Proposed operations.-The unexpended balance at the end of the
year, including accounts receivable, together with an allotment of
$1,975,000 made since June 30, 1937, will be applied as follows:
                                                   REGULAR       FUNDS


Accounts payable, June 30, 1937__-------------------------------                                                $109, 613. 04
New work:
   By contract (completion of existing contracts) : July 1, 1937,
     to June 30, 1938:
       Piling dikes:
            Hurricane Field-Cairo protection------ $25, 500. 00
            Powers Island-Goose Island--- _____-- -    10, 600. 00
            Devils Island-Schenimann __________        42, 700. 00
            Willard-Hanging Dog Island----------      105, 200. 00
            Crain Island-___ ___________               43, 600. 00
            Kaskaskia Island-Chester ..--...    ___    41, 300. 00
   By contract, July 1, 1937, to June 30, 1938:
       Piling dikes:
            Grand Tower Island__________________ 300, 500. 00                                              i



            Ste. Genevieve, Ill. and Mo                90, 800. 00
            Fish Bend-Danby Landing ___________ 145, 000. 00
            Calico Island-Cornice Island----------    135, 000. 00
       Revetments:
            Greenfield Bend-Hurricane Field            45, 300. 00       -------
            Wilkinson-Liberty Bend ---------------     60, 200. 00
                                                                                                               1, 045, 700. 00
      By hired labor with United States plant, July 1, 1937, to June
       30, 1938 :
          Piling dikes: Horsetail, east _____ _____________ __       -                                            48, 000. 00
           Total new work------------------------------------ 1, 093, 700. 00
Maintenance:
   By hired labor with United States plant, July 1, 1937, to June
      30, 1938 :
        'Dikes and revetments ___________________ $243, 170. 00
         Aids to navigation ______________________      18, 000. 00
         Project channel dredging-       -         -_  792, 500. 00
         Snagging_ ----------------------------- ----   30, 000. 00
         Surveys, tests, and studies------------------ 125, 000. 00
                                                                    1, 208, 670. 00
                Unallocated balance ___ -                     -----------                ___ _-_ __-
                                                                                                  ---                -25.      41
                Total for all work---------------------------------                                            2, 412, 008.45
                 RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                                            905
                                              EMERGENCY RELIEF FUNDS

   The unexpended balance at the end of the year, including accounts
receivable, will be applied as follows:
Accounts payable, June 30, 1937_____.   ______ -__----------      $2, 839.00
New work: By contract (completion of existing contracts) July 1,
  1937, to June 30, 1938, revetment, Cape Girardeau-------------- 51, 367. 62

          Total Emergency Relief funds_______---------------------                                                              54, 206. 62
  The sum of $2,300,000 can be profitably expended during the fiscal
year 1939 as follows:
New work :
   By contract, July 1, 1938, to June 30, 1939:
      Dikes --                                            ----      $450, 000
                                        _------------------------------
      Revetments _            -__                                    400, 000
   By hired labor, July 1, 1938, to June 30, 1939:
              Dikes            -----------                                                                        75, 000
              Revetments                          --------------------                                            75, 000
                                                                                                                               $1, 000, 000
Maintenance :
   By hired labor with United States plant, July 1, 1938,
      to June 30, 1939:
        Dikes and revetments__-   _______--                                                                     450, 000
        Project channel dredging                                                                                700, 000
              Surveys, tests, and studies_____________                                                          125,000
              Snagging -----                                                                                     25, 000
                                                                                                           --
                                                                                                                               1, 300, 000

          Total for all work _____                             _--         ---              --                            _    2, 300, 000
  It is expected that, with the proposed expenditures, the project
will be 76 percent complete.
                                               Cost and financial summary

                                   MAINTENANCE                  AND IMPROVEMENT FUNDS


Cost of new work to June 30, 1937__________________________                                                          1$31, 598, 191. 14
Cost of maintenance to June 30, 1937________________________                                                              19, 776, 745. 93

      Total cost of permanent work to June 30, 1937
Minus accounts payable June 30, 1937_
                                                                                                   --------     __
                                                                                                                          51, 374, 937. 07
                                                                                                                              109, 613. 04
     Net total expenditures_                                                                                          1   51, 265, 324. 03
Unexpended balance June 30, 1937_________________________                                                                     437, 008.45

         Total amount appropriated to June 30, 1937___________                                                            51, 702,332. 48

  Fiscal year ending June 30                      1933                    1934              1935                  1936              1937


Cost of new work_---------..... $2, 354, 097. 86                 $1, 277, 468. 17          $33, 347. 98         $41, 597. 15   $1, 029, 356. 40
Cost of maintenance........----------- 951, 859. 78               1, 659, 616. 53          899, 974. 77         644, 152. 00    1, 217, 414. 09
       Total cost_-------------_             3, 305,957. 64          2, 937, 084. 70       933, 322. 75         685, 749. 15    2, 246, 770. 49
Total expended_--_ - __            _ __ 3, 599, 802. 51          2, 906, 285.24        -1, 962, 932. 93         368, 365. 13    2, 232,503. 32
Allotted-_-----------------
                       __                    5, 122, 994. 46     2, 243,564. 23        -2,289,481.38      2,304,940. 52

   1 Includes $3,462,154.46 Public Works funds.
906            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936__ -  ------- ___________                                                       $2, 669, 511.77
Gross amount expended--------------------------------                                                           2, 232, 503. 32
Balance unexpended June 30, 1937---------------------------                                                          437, 008.45
Outstanding liabilities June 30, 1937 ---    --- $80,408. 55
Amount covered by uncompleted contracts -------  298,133. 84
                                                                                                                     378, 542.39

     Balance available June 30, 1937 -----                               ------------         58, 466.06
Amount allotted since June 30, 1937__--                                      ____---------1, 975, 000.00

           Balance avAilable for fiscal year 1938------------------                                                2, 033,466. 06

Amount (estimated) required to be appropriated for comple-
tion of existing project 2_________________________________                                                   11,400, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                  -
                                                                                                                1,000, 000.00
   For maintenance 2_____________________________________                                                       1, 300, 000. 00

           Total -----------------------------------------                                                      2, 300, 000. 00
   :   Exclusive of available funds.

                                        EMERGENCY             RELIEF    FUNDS


Cost of new work to June 30, 1937--                               --
                                                                 __---- -          -        -                       632.38
                                                                                                             -___-$948,
Cost of maintenance to June 30, 1937

     Total cost of permanent work to June 30, 1937--  -                                                   -__--948, 632.38
Minus accounts payable June 30, 1937  ------------- __                                                  -----      2, 839.00

     Net total expenditures __------------.....---                                                                   945, 793. 38
Unexpended balance June 30, 1937                                                                                      54, 206. 62

           Total amount appropriated to June 30, 1937_                                       -
                                                                                       _______-                    1, 000, 000. 00

           Fiscal year ending June 30                1933              1934            1935                  1936          1937


Cost of new work......--.----------.         --------------      ------------ ------------ $664, 495. 21                $284, 137. 17
Cost of maintenance .....
Total expended---------------------------............................------------...
                                                                        ------------ 639, 226. 83                        306, 566. 55
Allotted            ------------------------
                                         ---------------------- $1, 000,000



Balance unexpended July 1, 1936-----------                                             -----                        $360, 773.17
Gross amount expended_--__--____--   __                             ------------        __                           306, 566. 55
     Balance unexpended June 30, 1937    __----- -                                      -      __             --      54,206.62
Amount covered by uncompleted contracts -------                                                    ---
                                                                                            -__- ___                  54, 206. 62

CONSOLIDATED         COST AND FINANCIAL SUMMARY FOR MISSISSIPPI RIVER,                                               OHIO RIVER
                                    TO MISSOURI RIVER

Cost of new work to June 30, 1937-----------------------                                                     $32, 546,823. 52
Cost of maintenance to June 30, 1937 ----------       -                                                       19, 776, 745. 93

           Total cost of permanent work to June 30, 1937---                                     -----          52, 323, 569. 45
                    RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                                             907
Minus accounts payable June 30, 1937                                     ____-------------------                                $112, 452. 04

     Net total expenditures------------------- -------------                                                               52, 211, 117. 41
Unexpended balance June 30, 1937----------------------------                                                                   491, 215. 07

            Total amount appropriated to June 30, 1937 ------------                                                        52, 702, 332.48


   Fiscal year ending June 30                      1933                1934                 1935                    1936                1937


Cost of new work-------.............. $2,354,097. 86            $4,080,073.68            $593, 879. 18       $805, 110. 11         $1,313,493.57
Cost of maintenance-----------           951, 859. 78            1, 659, 616. 53          899, 974. 77        644, 152. 00          1, 217, 414. 09
        Total cost--..-----------3,305,957.                64     5, 739, 690. 21       1,493,853.95        1,449, 262. 11          2, 530,907.66

Total expended............-------------....   3,599              5, 725, 543. 35      -1, 435, 477.18       1, 123, 032.56          2, 539, 06987
Allotted-..........---              ..-----   5, 122, 904. 46     5,160,944.70          -664, 481.38        2, 224, 714. 51 ..



Balance unexpended July 1, 1936 ------------------                                                                         $3, 030,284.94
Gross amount expended------------------                                                                                     2, 53,, 069.87
      Balance unexpended June 30, 1937 --------------                                                                            491, 215. 07
Outstanding liabilities June 30, 1937---------------$80,408. 55
Amount covered by uncompleted contracts---------- 352,340.46
                                                                                                                                 432, 749. 01

     Balance available June 30, 1937-------------------------___                                                                   58, 466. 06.
Amount allotted since June 30, 1937'---------------                                                                            1, 975, 000. 00

     Balance available for fiscal year 1938 -----.------------                                                                 2, 033, 466. 06;
Amount (estimated) required to be appropriated for completion
   of existing project _____________________                                                                   --          11, 400, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work                                                                                                                1----------------------------------
                                                                                                                                  000, 000. 00
                         - - - - - - - - --
   For maintenance - _ - _-                 - - --
                                                   .- --- - - -1, - -                                                      -
                                                                                                                                  300, 000. 00
                      1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
           Total                                                                                                               2, 300, 000. 00
   x Exclusive of available funds.


2. MISSISSIPPI RIVER BETWEEN MOUTH OF MISSOURI RIVER AND
                      CLARKSVILLE, MO.

See report, "Mississippi River between the Missouri River and
Minneapolis, Minn.", page 916.

3. REMOVING SNAGS AND WRECKS FROM THE MISSISSIPPI RIVER
   BELOW THE MOUTH OF MISSOURI RIVER AND FROM OLD AND
  ATCHAFALAYA RIVERS

   The section of the Mississippi River covered in this report was
formerly in charge of the St. Louis engineer district, but for the
purpose of administration on July 1, 1930, it was divided into three
reaches, which are under the supervision and direction of the district
engineers at St. Louis, Mo., Memphis, Tenn., and Vicksburg, Miss.
908      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The St. Louis district extends from the mouth of the Missouri River
to the mouth of the Ohio River, a distance of 195 miles. The Mem-
phis district extends from the mouth of the Ohio River to the mouth
of the Arkansas River, a distance of 399 miles. The Vicksburg dis-
trict extends from the mouth of the Arkansas River to the Head
of Passes, 671 miles, and includes 8 miles of Old River and 30 miles
of the Atchafalaya River.
   District engineers: St. Louis, Mo., Lt. Col. P. S. Reinecke, Corps
of Engineers; Memphis, Tenn., Col. Eugene Reybold, Corps of
Engineers; Vicksburg, Miss., Lt. Col. Lunsford E. Oliver, Corps of
Engineers.
   Division engineers: For the river below the mouth of the Ohio,
Brig. Gen. H. B. Ferguson, Corps of Engineers; for the river above
the mouth of the Ohio, Col. J. N. Hodges, Corps of Engineers.
   Location.-The snagging district embraces that portion of the
river between ?Head of Passes and the mouth of Missouri Riv'er 4
1,265 miles, 8 miles of Old River (present mouth of Red River), and
30 miles of Atchafalaya River from Red River to Melville, La.; total,
1,303 miles.
   Previous projects.-For the removal of these obstructions general
appropriations were made at irregular intervals as early as 1824.
The amount expended prior to 1879, when the first definite allot-,
ment was made for the work, was approximately $358,627.35. For
further details, see page 1880, Annual Report for 1915.
   Existing project.-This is a continuation of the plan adopted in
1879, and provides for the removal and destruction of snags, wrecks,
drift heaps, and other obstructions to navigation in the Mississippi
River between Head of Passes (13 miles from mouth of South Pass)
and mouth of Missouri River, and in Old and Atchafalaya Rivers
 (38 miles) to Melville, La.; also for the felling of large trees on or
near caving ,banks, thereby decreasing the number of snags to be
destroyed thereafter.
   The work is done by the Department's steel-hull snag boats C. B.
Reese, built in 1879 (rebuilt 1901) ; C. W. Howell, built in 1881; the
Charles H. West, built in 1934; and other plant; all fitted with the
necessary equipment and appliances and operated by Government
employees.
   Annual appropriations or allotments were made for this work
1879 to 1886, inclusive, except in 1883 and 1885. A continuous annual
expenditure of $100,000, or as much thereof as might be necessary
for the maintenance of this service, was authorized by section 7 ,of
the River and Harbor Act of August 11, 1888, and has been available
each year to the end of the fiscal year 1935. In addition thereto, and
to cover costs greatly increased by war conditions, an appropriation
of $50,000 was made in the River and Harbor Act of March 2, 1919.
and allotments of $25,000, $20,000, $17,500, and $13,000 were made
from War Department Appropriation Acts of June 30, 1922, March
2, 1923, June 7, 1924, and April 15, 1926, respectively. Since June
30, 1935, the work has been done with funds appropriated for the
preservation and maintenance of rivers and harbors under the pro-
          RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                909
visions of the Permanent Appropriations Repeal Act, approved June
26, 1934.
    No modification of the project has been made since its adoption
except that the River and Harbor Act of March 3, 1909, included the
Atchafalaya and Old Rivers from their junction with the Mississippi
and Red Rivers to Melville, La., in the district to be served.
    Terminal facilities.-Forinformation under this heading reference
should be made to the report on improving ,the Mississippi River
between Ohio and Missouri Rivers and to reports of the Mississippi
River Commission and district engineers thereunder.
    Operations and results during fiscal year.-The entire section of
river included in the project was patrolled and cleared of obstructions,
except that from Warrenton, Miss., to Head of Passes, 454 miles,
where work was not required, and Missouri River to Ohio River, 195
miles (no snag boat available), was not patrolled.
    Mouth of Missouri River to mouth of Ohio River (St. Louis dis-
trict).-The work in this district consisted of clearing some 675,000
square feet of river bank of brush and timber to prevent formation of
snags, and removal of about 2,540 linear feet of old pile dikes and
2,000 linear feet of old revetment which had become obstructive,:in-
volving the moving of 96,735 cubic yards of material by diphpe
dredge, all at a cost of $29,494.65, and expenditure of $33,765.78 from
regular funds.
    Mouth of Ohio River to mouth of White River (Memphis dis-
trict).-During the year the snag boat C. B. Reese ran 1,674 miles and
destroyed 823 snags at a cost of $24,698.31 and expenditure of
$25,880.61.
    Mouth of White River to Head of Passes and Old and Atchafalaya
Rivers (Vicksburg district).-Durmg the year the snag boat C. H.
West made 21 complete trips between the mouth of White River and
Warrenton, Miss. No snagging was necessary below that point. Dur-
ing these trips, 5,929 miles were run and 228 snags were destroyed, at
a cost and expenditure of $25,000.
   The total cost of work under the project for the year was $79,192.96
and the total expenditure was $84,646.39.
   Condition at end of fiscal year.-The project being one of continu-
ous maintenance of channel, no estimate of completion and total cost
can be made. Each freshet brings down new obstructions and changes
in location of channel, which are constantly going on, uncover old
obstructions. The number of obstructions destroyed annually varies
from several hundred to several thousand (Annual Report, 1920,
p. 2503).
   This work is of great benefit to commerce and navigation of the
river, and disasters caused by vessels striking channel obstructions
seldom occur.
   Operations in the various districts provided a channel reasonably
free from snags at the end of the fiscal year, and there is sufficient
plant available to take care of future work.
   The total cost of the existing project at the end of the fiscal year
was $5,064,719.56 for maintenance. The total expenditures under the
910           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

existing project were $5,062,464.61, of which $4,146,102.75 was from
appropriation provided under section 7 of the act of August 11, 1888.
   Proposed operations.-This work is continuous since new obstruc-
tions are brought down by each freshet though not in such quantity
as formerly. The unexpended balance at the end of the year, together
with an allotment of $70,000 made since June 30, 1937, will be applied
to removing obstructions to navigation in the following districts:
Accounts payable -----------------------------------------                                                   $2, 254. 95
St. Louis -----        ------------------------------------                                      ----        20, 000. 00
Memphis ------          ------------------------------------------                                           31, 257.92
Vicksburg ----------------------------------------------                                                     25, 000. 00

          Total---          ---------------------------------------                                          78, 512. 87
  The work will be done by hired labor with Government plant. It is
expected that the funds will be exhausted by June 30, 1938.
  It is estimated that $100,000 from regular maintenance and im-
provement funds will be required during the fiscal year 1939 for
removing obstructions from rivers under this project in the following
districts:
St. Louis ------------------------------------------------                                                     $50, 000
Memphis ----------------------                         ----------------------------                             25, 000
Vicksburg -------------------------------------------------                                                     25, 000

          Total-------                  ------       -----------------------------                              00, 000
                                                                                                               1--
                                     Cost and financial summary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937------------------                                            2   $5, 423, 346. 91
     Total cost of permanent work to June 30, 1937---------7      5, 423, 346. 91
Minus accounts payable June 30, 1937         --------------------       , 254.95
                                                                       2-----

     Net total expenditures----------------------------                                          12     5, 421, 091. 96
Unexpended balance June 30, 1937--------------------                                                         8, 512. 8

          Total amount appropriated to June 30, 1937-----------                                       25,429,604. 83

          Fiscal year ending June 30                1933              1934         1935          1936             1937

Cost of new work- - - - - - - - - - ---- -- -- -- -- -- -- -- -- -- - - - -
Cost of maintenance---------------------- $88, 086. 08 $50, 000.00 $83, 430.00 $83, 549. 12 $79, 192.96
Total expended----.----------------------         79,651.07     62,865.03     1 82, 189.79     77,080.95        84, 646.39
Allotted..-----   ----- ------------------ 52, 556. 41          43, 465. 13     143, 893. 96   90, 000. 00       7,000.00


Balance unexpended July 1, 1936__________     ___________________ $86, 159. 26
Amount allotted from War Department Appropriation Act approved
  May 15, 1936 --------- --------------------                       7, 000. 00
      Amount to he accounted for___----------------------------93,                                               159. 26
Gross amount expended-------------------------        $89, 853. 74
Less reimbursements collected-- -- ____--__-        -____5, 207. 35
                                                                                                             84, 646. 39
           Balance unexpended June 30, 1937          ____________________-                              _      8, 512. 87
       Includes $5,260,604.83, from permanent indefinite appropriation.
   2   Includes $174,219.30 for Memphis district and $204,840.55 for Vicksburg district.
                RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                                         911
Outstanding liabilities June 30, 1937--_--------------------                                                ---            $2, 254. 95

     Balance available June 30, 1937----------------------------                                                            6, 257.92
Amount allotted since June 30, 1937------------------------------                                                          70, 000. 00

         Balance available for fiscal year 1938----------------------                                                      76, 257. 92

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance             __-------------------------------- 100, 000.00
  8 Exclusive of available funds.

    4. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                               (GENERAL)

  The cost of the work during the year was $56,573.48 and the ex-
penditures were - $87,569.05. The balance unexpended, $50,563.29,
including $50,000 allotted during July 1937 will be applied as
needed during the fiscal year 1938 to payment of expenses incurred
under this heading. The additional sum of $40,000 can be profitably
expended during the fiscal year ending June 30, 1939.

                                               Cost and financial summary

Cost of new work to June 30, 1937---------------------                                                                   -----------
Cost of maintenance to June 30, 1937-----------------------                                                              $186, 223.32

     Total cost of permanent work to June 30, 1937------------   186, 223.32
Minus accounts payable June 30, 1937 ---------------------------      563. 20

     Net total expenditures----- --------------------                                                                     185, 660. 12
Unexpended balance June 30, 1937------------------------------                                                                 563.29

          Total amount appropriated to June 30, 1937--------------                                                        186, 223. 41

          Fiscal year ending June 30                              1933             1934         1935              1936             1937


Cost of new work---
                ............---
                          - -      -
Cost of maintenance.-------------------
                                       -   -   -   -   -   -
                                                               $10, 429. 58   $39,113. 28    $29, 485. 39   $19, 121. 59
                                                                                                                                    --
                                                                                                                                   --
                                                                                                                                $56, 573.48

Total expended .....-----------------------                     61, 018.06     85, 000. 00    73, 002. 78    22, 769. 31        -87, 569.05

Allotted ................----------------------------          131, 443. 98    33, 279. 43    95, 000. 00    45, 000. 00     -150, 000. 00


Balance unexpended July 1, 1936___-----------------------------                                                           $62, 994. 24
Deductions on account of revocation of allotment-----------                                                               150, 000. 00

      Net amount to be accounted for----------------------------                                                           87, 005. 76
Gross amount expended---------------------------- $58, 345. 14
Less reimbursements collected----------------        145, 914. 19
                                                                                                                         -87,     569.05
     Balance unexpended June 30, 1937-------------------------                                                                    563. 29
Outstanding liabilities June 30, 1937----------------------------                                                                 563. 20
      Balance available June 30, 1937--------------------------                                                                       .09
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937   -----------------------------------                                                             50, 000. 00
Balance available for fiscal year 1938------------------------                                                             50. 000. 09
Amount that can be profitably expended in fiscal year ending June
                             1-                          -
    30, 1939, for maintenance                                  ___            __          _______40,                              000.00
   1 Exclusive of available funds.
        20196---37-pt. 1----58
912          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

            5. PLANT ALLOTMENT FOR ST. LOUIS, MO., DISTRICT

                                  Cost and financial summary
Undistributed costs June 30, 1937 _________________________ $3, 097, 638. 77
Plus accounts receivable June 30, 1937 _____________________---288, 706. 21

     Gross total costs to June 30, 1937 _______________--___                                      3, 386, 344. 98
Minus accounts payable June 30, 1937_________    ________-_                                          159, 714. 00

     Net total expenditures___---   ______________                                                3, 226, 630. 98
Unexpended balance June 30, 1937 __________________                                        __        320, 109. 67
        Total amount appropriated to June 30, 1937 _____-----3, 546, 740. 65

   Fiscal year ending June 30          1933            1934               1935            1936                 1937


Total expended      .----             _-------_
                                ..-.....
                                       -      ___..............     $3, 136, 589. 26   $147, 126. 27      -$57, 084. 55
Allotted-.---.--.-...----------.------...-..--..                   - 3, 207, 080. 72    189, 659. 93             000. 00
                                                                                                              150,


Balance unexpended July 1, 1936_,              _________                                               $113, 025. 12
Amount allotted from War Department Appropria-
  tion Act approved April 9, 1935___-----_----        - _ $150, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936 .....-                     30, 601. 30
                                                                                                        180, 601. 30
     Amount to be accounted for----------------------------                                            293, 626. 42
Deductions on account of revocation of allotment-__---- ----                                            30, 601. 30

      Net amount to be accounted for ___         _                                                      263, 025. 12
Gross amount expended-____---                      __-__--___
                                                    $3, 313, 965. 23
Less-
    Reimbursements collected----- $3, 310, 833. 74
    Receipts from sales -----------    60, 216,. 04
                                                     3, 371, 049.78
                                                                                                       -57,    084. 55
      Balance unexpended June 30, 1937         ____                                                    320, 109. 67
Outstanding liabilities June 30, 1937_ ________111$235, 363. 88
Amount covered by uncompleted contracts--------     242, 433. 01
                                                                                                       477, 796. 89

     Balance available June 30, 1937____---                       ____-       -____              -- 157, 687. 22
Accounts receivable June 30, 1937                                                                   288, 706. 21

        Unobligated balance available June 30, 1937                                                    131, 018. 99
6. UPPER MISSISSIPPI RIVER VALLEY (ST. LOUIS DISTRICT), FLOOD
                           CONTROL

  Location.-The flood-control improvements included in this project
are located generally along the Mississippi River between Cape
Girardeau, Mo., and the mouth of the Missouri River. The levee
districts affected are in the States of Illinois and Missouri.
                RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                              913
   Existing project.-The Flood Control Act approved June 22, 1936,
authorized the construction of flood-control works in the upper Mis-
sissippi Valley at the following' localities in the St. Louis, Mo.,
district:

                                                                                                      Estimated      Estimated
                                             Project                                                  construc-        cost of
                                                                                                       tion cost     land and
                                                                                                                     damages


East St. Louis, Ill., and vicinity, raise and enlarge existing levees to protect popu-
   lation and railroad center_                                                                  $1, 158, 000            $75, 000
East Cape Girardeau and Clear Creek drainage district, Illinois, raising and en-
   larging existing levee system to improve protection----_         -     -------------     _       395, 000             12, 000
North Alexander drainage and levee district, Illinois, raising and enlarging exist-
   ing levee system to improve protection------     __--     ---------------------- --              271, 000             14, 000
Clear Creek drainage and levee district, Illinois, raising and enlarging existing
   levee system to improve protection __________...................                                 649, 000             15, 800
Preston drainage and levee district, Illinois, raising and enlarging existing levee
   system to improve protection_...            _                                                    244, 000              8,100
.Degognia and Fountain Bluff levee and drainage district, Illinois, raising and
   enlarging existing levee system to improve protection--------------------------                  330, 000             14, 300
Perry County drainage and levee districts nos. 1, 2, and 3, Missouri, raising and
   enlarging existing levee system to improve protection...-------------                            859, 000             49, 000
St. Genevieve levee district no. 1, Missouri, raising and enlarging existing levee
   system to improve protection....  --------------                                                  40, 000              2, 000
Fort Chartres and Ivy Landing drainage district no. 5, Illinois, raising and en-
   larging existing levee system to improve protection _-_                                          120, 000              7, 000
Harrisonville and Ivy Landing drainage and levee district no. 2, Illinois, raising
    and enlarging existing levee system to improve protection -------------------                   453, 000             15, 000
Columbia drainage and levee district no. 3, Illinois, raising and enlarging exist-
    ing levee system to improve protection_____-         --      _______________         _    _     546, 000             18, 300
Wilson and Wenkel and Prairie du Pont drainage and levee districts, Illinois,
   raising and enlarging existing levee system to improve protection...--........------------ 520, 000                   18, 700
Chouteau, Nameoki, and Venice drainage and levee district, Illinois, raising and
    enlarging existing levee system to improve protection_----   ___.........             .         132, 000              4, 700
St. Louis County drainage and levee district, Missouri, raising and enlarging
    existing levee system to improve protection.._ _    -            -----------                    259, 000             20, 000
Wiedmer Chemicals drainage and levee district, Missouri, raising and enlarging
   existing levee system to improve protection_- ---------------------                __      _      76, 500              1, 500
       Total................................-------------------------------------------------------    6, 052, 500      275, 400



   Local cooperation.-See page 6. Assurance of local cooperation
has been received and approved for all the drainage and levee dis-
tricts listed above, except St. Louis County, from which no assurance
has been received and whose participation is doubtful, and Wiedmer
Chemicals, in which case all action has been deferred by authority of
the Chief of Engineers.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work has not been started. Defi-
nite project reports have been approved for all authorized work ex-
cept in the St. Louis County district and the Wiedmer Chemicals dis-
trict. Specifications and plans are 75 percent complete for portions
of the work in the East St. Louis, Ill., area, the Wilson and Wenkel
and Prairie du Pont districts, Illinois, and the Perry County districts
nos. 1, 2, and 3, Missouri.
   Proposed operations.-An allotment of $1,083,534, made since June
30, 1937, will be applied in commencement of work, as follows:
914       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                REGULAR FUNDS
New work:
   By contract and continuing contract (raising and            enlarging existing levees),
     July 1, 1937, to June 30, 1938.
       East St. Louis, Ill., and vicinity ________-             $375, 000. 00
       Perry County drainage and levee districts
          nos. 1, 2, and 3, Missouri -----------------          335, 000. 00
       Wilson and Wenkel and Prairie du Pont
          drainage and levee districts, Illinois-----           207, 000. 00
       Columbia levee and drainage district,
          Illinois--------__-------------- ------      -        166, 534. 00

                Total, all for new work ___.--.            _______-------       $1, 083, 534.00

                            EMERGENCY RELIEF FUNDS

  An allotment of $184,850, made since June 30, 1937, will be applied
as follows:
New work:
   By contract and continuing contract (raising and enlarging existing levees),
     July 1, 1937, to June 30, 1938.
       East St. Louis, Ill., and vicinity------------$47, 000. 00
       Perry County drainage and levee districts nos.
          1, 2, and 3, Missouri_ -    ------            56, 000. 00
       Wilson and Wenkel and Prairie du Pont drain-
         age and levee districts, Illinois____-         29, 000. 00
       Columbia levee and drainage district, Illinois__ 52, 850. 00
                Total, all for new work ___          ____--          -_________- $184, 850.00
  The sum of $1,182,000 can be profitably expended during the fiscal
year 1939, as follows:
New work:
   By contract and continuing contract (raising and enlarging
     existing levees), July 1, 1938, to June 30, 1939:
       East St. Louis and vicinity_ ________________-___--       -   $336,000
       Wilson and Wenkel and Prairie du Pont drainage and levee
          districts, Illinois-------------------------------------48,000
       Columbia drainage and levee district no. 3, Illinois            ----
                                                                      327, 000
       North Alexander drainage and levee district, Illinois--------  271, 000
       Harrisonville and Ivy Landing drainage and levee district
          no. 2, Illinois-------------------------------------------200, 000
               Total for new work            ----------------------------           1, 182,000

                            Cost and financial summary
Total amount appropriated to June 30. 1937
Amount (estimated) required to be appropriated for completion
of existing project   ------  ------------------------------                      $6, 052, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work 1_    ----------------------------                          1, 182, 000
1 Exclusive of $1,268,484 allotted since June 30, 1937.

7. ILLINOIS AND DES PLAINES RIVER BASIN                        (ST. LOUIS DISTRICT)
                       FLOOD CONTROL

  Location.-The flood-control improvements included in this project
are located in levee districts lying along the Illinois River between its
mouth and Havana. All work is in the State of Illinois.
  Existing project.--The Flood Control Act approved June 22, 1936,
authorized the construction of flood-control works in the Illinois and
Des Plaines River Basin at the following localities in the St. Louis,
                 RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                         915
Mo., district, in accordance with plans contained in House Document
No. 182, Seventy-second Congress, first session:

                                                                                                   Estimated     Estimated
                                            Project                                                construc-      land and
                                                                                                   tion costs    damages


Between Beardstown, Ill., and mouth of Illinois River, levee set-back and im-
  provements to floodway:
    South Beardstown drainage and levee district..------------------ ---------                       $220, 000      $40, 000
    Coal Creek drainage and levee district...---...-------..............-------------- -------        311, 000       58,000
   McGeeCreek levee and drainage district .......................-------------------------------      135, 000        5, 000
Lost Creek drainage and levee district, Illinois, improve existing levee for addi-
  tional protection to people and property 1-----------.                         --       ..---------------
                                                                                                -
Big Lake drainage and levee district, Illinois, improve existing levee for addi-
  tional protection to people and property   ---------------------------------      52, 500               4,000
Seahorn drainage and levee district, Illinois, improve existing levee for additional
protection to people and property .---------------        -----------------------   32,000                           2,000
Lacey, Langellier, West Matanzas, and Kerton Valley drainage and levee district,
Illinois, set back and improve existing levees to protect people and property __   188, 400                         49, 000
Kelly Lake drainage and levee district, Illinois, improve existing levees for addi-
tional protection to people and property---------------------------------100,200                                     4,800

       Total...........................-------------------------------------------------------1,     039, 100       162, 800

  1Completed     under sec. 6 of the Flood Control Act of May 15, 1928.


   Local cooperation.-See page 6. Assurance of local cooperation
has been received and approved for the following drainage and levee
districts: Coal Creek, Big Lake, Seahorn, and Kelly Lake. Infor-
mal assurance has been received from South Beardstown and Lacey,
Langellier, West Matanzas, and Kerton Valley districts. Assurance
is not complete for the McGee Creek district.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The work authorized in the Lost
Creek district has been constructed under authority of section 6 of the
Flood Control Act of May 15, 1928. The work authorized in the
Kerton Valley district is being constructed under the authority of
the Flood Control Act of 1928. Work on the other projects has not
been started. Definite project reports have been approved for all
authorized work except in the Lacey, Langellier, West Matanzas,
and Kerton Valley districts.
   Proposed operations.-The sum of $32,000 allotted since June 30,
1937, will be applied in commencement of work as follows:
   Sea Horn levee and drainage district-------------------------                                                 $32, 000
  An additional sum of $408,400 can be applied, during the fiscal year
1939, as follows:
                                                         PROJECT

Between Beardstown, Ill. and Mouth of Illinois River, South Beards-
  town drainage and levee district, Illinois ----------   ----      $220, 000
Lacey, Langellier, West Matanzas, and Kerton Valley drainage and
levee districts, Illinois________ --------------------                                                          188, 400
          Total for new work___------------------------------------                                              408, 400
                                        Cost and financial summary
Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion of
existing project 1----------------------------------------      $1, 039, 100
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work-------            -----------------------------                                          408,400
1 Exclusive of $32,000 allotted since June 30, 1937.
916            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

MISSISSIPPI RIVER BETWEEN THE MISSOURI RIVER
             AND MINNEAPOLIS, MINN.
   The section of the river covered in this report is divided into
three reaches, under the supervision and direction of district engi-
neers at St. Louis, Mo., Rock Island, Ill., and St. Paul, Minn.
   The section in the St. Louis district extends from the mouth of
the Missouri River to Clarksville, Mo., a distance of 78 miles; the
Rock Island district extends from Clarksville, Mo., to the mouth of
the Wisconsin River, a distance of 358 miles; and the St. Paul district
extends from the mouth of the Wisconsin River to and including the
harbor of Minneapolis, Minn., a distance of 222 miles, and an unde-
termined distance above the harbor of Minneapolis, Minn., depending
on future plans to be approved by the Chief of Engineers and the
Board of Engineers for Rivers and Harbors, for an extension of the
project above St. Anthony Falls as provided for in the River and
Harbor Act of August 26, 1937.
   District Engineers: At St. Paul, Minn., Maj. Dwight F. Johns,
Corps of Engineers; at Rock Island, Ill., Lt. Col. Raymond A.
Wheeler, Corps of Engineers, to August 12, 1936; Lt. Col. Earl E.
Gesler, Corps of Engineers, since that date; and at St. Louis, Mo.,
Lt. Col. Paul S. Reinecke, Corps of Engineers.
   Division Engineer: Col. John N. Hodges, Corps of Engineers.
   Assistants to the Division Engineer: Lt. Col. Malcolm Elliott,
Corps of Engineers; Capt. Emerson C. Itschner, Corps of Engineers;:
and Maj. Bartley M. Harloe, Corps of Engineers, to August 31, 1936.
   Location.-The Mississippi River rises in the northern part of
Minnesota, flows about 2,440 miles in a southerly direction, and
empties into the Gulf of Mexico. The portion included in this report
extends from the mouth of the Missouri River to and including the
harbor of Minneapolis, Minn., a distance of 658 miles.
   Previous projects.--Adopted by the River and Harbor Acts of
June 10, 1872, June 18, 1878, August 18, 1894, February 9, 1905,
March 3, 1905, March 2, 1907, June 25, 1910, September 22, 1922,
March 3, 1925, January 21, 1927, and July 3, 1930. The costs on the
different projects prior to the commencement of work on the existing
project were as follows:

                                                                               New work           Maintenance

Between Missouri River and Clarksville, Mo....----------------------- $4, 952, 482. 76             $1, 705, 886. 00
Between Clarksville, Mo., and Wisconsin River .....--------------------- 29, 159, 537. 01           1, 317, 928. 11
Wisconsin River to Minneapolis.---------------------------------14, 380, 626. 04                       742, 836. 19
      Total-    ............   ___              ____-- __......
                                      ____......__-               ..---- ...   48, 492, 645. 81     3, 766, 650. 30


  Total, new work and maintenance, $52,259,296.11.
  In addition, an amount of $2,482,996.41 was expended for plant,
materials, and stock used on the existing project, making the total
expenditures $54,742,292.52.
  For further details see pages 1879, 1880, and 1887 of the Annual
Report for 1915, and pages 1106, 1107, and 1108 of the Annual Report
for 1932.
         RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                 917
    Existing project.--This project provides for a channel of 9-foot
depth and of adequate width between the mouth of the Missouri
River (1,273 miles from the Gulf) and above St. Anthony Falls, by
the construction of a system of locks and dams, supplemented by
dredging, all main locks below Hastings (no. 2) to be of Ohio River
standard dimensions, namely, 110 feet wide by 600 feet long. The
project also provides for a further improvement at St. Paul to
provide a basin 9 feet deep, varying in width from 400 to 1,100 feet
and extending downstream from the Robert Street Bridge for a
distance of 2.7 miles, and at Minneapolis to provide adequate terminal
facilities.
    The estimate of cost for new work, revised in 1937, is $153,000,000,
including $298,780.77 covering actual cost of the improvement at St.
Paul, $40,000 of which has been contributed by local interests, and
including $2,515,566 for rectification of damages to drainage and levee
districts. The above estimate is exclusive of the estimated cost of
extending the 9-foot channel over St. Anthony Falls, the definite
amount thereof being dependent upon the plan to be approved by the
Board of Engineers for Rivers and Harbors, as provided in the River
and Harbor Act of August 26, 1937; and is exclusive of amounts
expended on previous projects. The latest approved estimate- for
maintenance and operating cost is $1,750,000 annually, including
 $750,000 for operating and care of locks and dams; exclusive of costs
of maintenance and operating and care pertaining to the extension
of the project over St. Anthony Falls.
    The project was adopted by the River and Harbor Act of July
3, 1930, to be prosecuted in accordance with the plan for a compre-
hensive project to secure a channel of 9-foot depth, submitted in
House Document No. 290, Seventy-first Congress, second session.
The amount authorized to be appropriated under the act of July
3, 1930, was limited to $7,500,000, in addition to the amounts author-
ized under then existing projects. Under Public Resolution No. 10,
Seventy-second Congress, first session, approved February 24, 1932,
the Chief of Engineers was granted discretionary authority to make
such modification in the plan as may be advisable. The River and
Harbor Act of August 30, 1935, established the lower limits of the
project as the Missouri River, authorized further improvement of
the harbor at St. Paul, Minn., and authorized the appropriation
of the entire sum required for the completion of the project (H. Doc.
No. 137, 72d Cong., 1st sess., and River and Harbor Committee Doc.
No. 44, 74th Cong., 1st sess.)
    Under the River and Harbor Act of August 26, 1937, the project
was modified in accordance with recommendation of the district
engineer, Rock Island, Ill., in the report submitted in Rivers and
Harbors Committee Document No. 34, Seventy-fifth Congress, first
session. The modification provides for rectification of damages that
may be caused drainage and levee districts bordering the Mississippi
River by seepage and backwater as a result of the navigation im-
provement. The estimated cost is $2,515,566, including $624,645 for
acquiring low-lying lands in seven districts, $125,000 for continuing
a study of the districts for 5 years, $247,290 for annual rectification
of damages during the period of study, $150,000 contingent construc-
tion by the United States, and $1,368,631 for estimated capitalized
increased drainage costs.
918     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The River and Harbor Act of August 26, 1937, further provides
for extension of the 9-foot channel above St. Anthony Falls, in ac-
cordance with the plan contained in House Document No. 137,
Seventy-second Congress, first session, subject to such changes
therein as may be found advisable by the Chief of Engineers and
the final approval of the plan by the Board of Engineers for Rivers
and Harbors, as necessary to provide adequate terminal facilities for
Minneapolis, Minn. A definite modification of the existing project
at this time, to provide for such extension, awaits final approval of a
plan by the Board of Engineers for Rivers and Harbors.
   Prior to the River and Harbor Act of August 30, 1935, work was
prosecuted on the project with Public Works and Emergency Relief
funds.
   Operation of snag boats, and operation and care of locks and dams
were included in the project July 1, 1935, under the provisions of
the Permanent Appropriation Repeal Act approved June 26, 1934.
   The latest map and profile published showing this section of the
river have been inserted between pages 20 and 21 of House Docu-
ment No. 137, Seventy-second Congress, first session. A map of
the section, Minneapolis to Lake Pepin, is published in House Docu-
ment No. 583, Sixty-ninth Congress, second session. The latest pub-
lished maps of the locality at Moline are in House Document No. 397,
Fifty-eighth Congress, second session, and House Document No. 263,
Sixty-ninth Congress, first session. A map showing location of drain-
age districts (Bellevue, Iowa, to Missouri River) is published in
Rivers and Harbors Committee Document No. 34, Seventy-fifth Con-
gress, first session.
   Pertinent data for existing and proposed locks and dams are given
in the following table:
                                       Location                                                    Lock
                                                                                                                                                                                           Per-
                                                                  Dimensions         Depth on miter sill                                                                                  cent-            Estimated cost
                                                                                                                                                                                        age    Year of each lock and
                                                                                                                                                       Character of dam                com- opened dam, including                    H




                           Miles                                          Great-                                                                         foundation                   pleted, to navi- work in pool              C




                           above        Distance from         Width         est                                             Character of                                               locks gation    and flowage               hI
                            Ohio        nearest town            of        length                        1                   foundation                                                  and             damages 2
                           River                              cham-       avail-     Lift 1 Upper           Lower 1                                                                    dams
                                                               ha-        able for
                                                                          erfull
                                                                          width                                                                                                                                                      M
                                                                       Feet           Feet      Feet         Feet
Lock and dam no. 1.___ 847.6          6.2 miles above
                                         Omaha R. R.
                                                              { Feet56
                                                                  56
                                                                        400
                                                                        400
                                                                                     3 35. 9
                                                                                       35. 9
                                                                                               313.3
                                                                                               ! 12. 4
                                                                                                              10. O7 Sandstone and piles
                                                                                                               7.5J    in gravel,
                                                                                                                                                    Piles In
                                                                                                                                                      gravel.
                                                                                                                                                                    sand      and            100    1917   56$$1,000, 539. 26
                                        bridge, St. Paul,
                                         Minn.
Lock and dam no. 2.__      815. 2     1.3 miles above Hast-   {     110       500      12. 2    15.9          15. 0 Piles in sand, silt, and        Piles in sand, silt, and               8 100    1930     0 4, 645, 000. 00           a
                                        ings, Minn.               7 110     7 600                                     clay.                           clay.
Lock and dam no. 3._       796.9      6.1 miles above Red           110       600      8.0      17.0          14. 0 ....do_----------------         Piles in sand --------_               1o 100               6,112, 000.00
                                         Wing, Minn.                                                                                                                                        1126J
Lock and dam no. 4-__      752. 8     Alma, Wis-.........          110       600       7.0      17.0          13.0   Piles in sand and              Piles in sand and                        100    1935       4, 512, 000.00
                                                                                                                        gravel.                       gravel.
rocck   and dam no. 5___   738.1  5.1   miles above                110       600       9.0      18. 0         12. 0 --.....--
                                                                                                                           do....----------------   Piles in sand-------........---         100     1935       5, 060, 000. 00
                                     Fountain City,
                                     Wis.
Locck and dam no. 5A_      728. 5 3.0 miles above                  110       600       5.5      18."0         12. 5   Piles in sand-.......... ..... do----------------                      100 1936          4, 648,
                                                                                                                                                                                                                     000.00
                                     Winona, Minn.
Locck and dam no. 6__.     714. 3 Trempealeau, Wis__               110       600       6.5      17. 0         12. 5 Piles in sand, gravel,          Piles in sand and clay-                  100    1936       4, 450, 000.00
                                                                                                                      and silt.
Locck and dam no. 7___ 702. 5 4.6 miles above La                   110       600       8.0      18. 0         12. 0 Piles in sand and               Piles in sand- .......                   100    1937       5,995, 000.00
                                 Crosse, Wis.                                                                         -gravel.
Lo ck and dam no. 8_t 679. 2 Genoa, Wis-........                   110       600      11.0      22. 0         14. 0 Piles in sand, gravel,          Piles in sand and                        100    1937       6, 565, 000. 00
                                                                                                                      and broken rock.                gravel.
Locck and dam no. 9___     647. 9 3.3 miles below                  110       600       9.0      16.0          13.0  Piles in sand-.........         Piles in sand-....---__           S1o 1001                 6,931,000.00
Locck and dam no. 10--
                                     Lynxville, Wis.
                           615. 1 Guttenberg, Iowa__               110       600        8.0     15.0          12. 0   -. do..------
                                                                                                                          ---            -   ..... do................
                                                                                                                                                                            1162J
                                                                                                                                                                              100
                                                                                                                                                                                      {             1936       4, 588,000.00
Locck and dam no. 11-_     583. 0 3.7 miles above                  110       600       11.0     18.5          12. 5   Piles in sand, gravel, ..... do--...--------------     100                               6, 107, 000. 00
                                    Dubuque, Iowa.                                                                      and silt.
Locck and dam no. 12__     556. 7 Bellevue, Iowa-......            110       600       9.0       17. 0        13.0    Piles in sand and Piles in sand and                  lo 1001                             5, 574, 000.00
                                                                                                                        gravel.                  gravel.                 S1110056J
Lo 3k and dam no. 13-.     522. 5     4.3 miles above              110       600       11.0     19. 0         13. 0   Piles in sand, clay, .....do................. S10o                                       6, 767, 000. 00
Lock and dam no. 14__      493. 3
                                         Clinton, Iowa.
                                      3.7 miles below Le           110       600       11.0     20. 5         13.5
                                                                                                                        and gravel.
                                                                                                                      Rock-------------       Rock..................
                                                                                                                                                                            11 41J
                                                                                                                                                                          10o 1001
                                                                                                                                                                                      {                        4,918,000.00
                                         Claire, Iowa.                                                                                                                                S11351

    See footnotes at end of tableI.
                                    Loctin                                                             ocI                                                                                     I                         Cb
                                    Location                                                          Lock
                                                           i

                                                                    Dimensions           Depth on miter sill                                                              Per-
                                                                                                                                                                          cent-                    Estimated cost
                                                                                                                                                                           age        Year of each lock and
                                                                                                                                                     Character of dam    com-       opened dam, including                 W
                         Miles                                           Great-                                                                        foundation       pleted,     to navi- work in pool                 4
                         above
                          Ohio
                                      Distance from
                                      nearest town
                                                                           est
                                                                   Width length                                               Character of
                                                                                                                              foundation
                                                                                                                                                                         locks
                                                                                                                                                                          and
                                                                                                                                                                                     gation  and flowage
                                                                                                                                                                                              damages I
                                                                                                                                                                                                                          0
                                                                     of                             1      1
                         River                                            avail-
                                                                   cham- able for       Lift 1 Upper Lower                                                               dams
                                                                    ber    full                                                                                                                                           H
                                                                         width
                                                               I            !                                -            I                  I   I                                 I -Feet
                                                                   Feet         Feet     Feet      Feet      Feet
Le Claire lock (canal)    493. 1   3.9 miles below Le                 80          320     11.0      17. 8     10. 8     Rock..................                              100      1922              (1)                M
                                      Claire, Iowa.
Lock and dam no. 15_..    482. 9 Foot of Arsenal Is-                 110          600     16.0      27. 0
                                                                                                               11.0.....                Rock __ _                           100      1934                    00
                                                                                                                                                                                                          000.            0
                                     land, Rock Island,              110          360     16.0      17.0               do-..........-......                                                            487,
                                                                                                                                                                                                     $7,
                                     Ill.
Lock and dam no. 16__     457. 2   1.8 miles above Mus-              110          600      9.0      17.0       12. 0    Piles in sand and  Piles in sand and                100                       5, 701,
                                                                                                                                                                                                            000.00
                                      catine, Iowa.                                                                       gravel.            gravel.
                                                                                                                                                                        j 10 100
Lock and dam no. 17__     437. 1   4.2 miles above New               110          600      8.0      16. 0      13.0    .....               Piles in sand-.-------
                                                                                                                            do...............--                           S1116                       5, 292, 000. 00
                                      Boston, Ill.
Lock and dam no. 18._     410. 5   6.5 miles above Bur-              110          600      9.8      16.5       13.7                          Piles in sand and
                                                                                                                        Piles in sand.........                              100                       5,514, 000. CO
                                      lington, Iowa.                                                                                           gravel.
                                   Keokuk, Iowa.......                110         358               14.0        9.2  Rock..-...........      Rock................          8100      1913           13 3,591, 000. 00
Lock and dam no. 19__     364. 2                                    l 110         600    38.2
Lock and dam no. 20__     343.2    0.9 mile above Can-.               110         600     10. 0     15. 0      12. 0 _---do................. Piles in sand and              100      1936             4, 661,000.00        1
                                      ton, Mo.                                                                                                 gravel.
                                                                                                                                                                          to100
Lock and dam no. 21__     324.9    2.1 miles below                   110          600     10. 5     16. 5      12. 0 Piles in sand and .....     do................        74
                                                                                                                                                                           11                         5, 236, 000. 00
                                      Quincy, Ill.                                                                     gravel.                                          S11          .......

Lock and dam no. 22__     301.2    1.5 miles below Sav-
                                      erton, Mo.
                                                                     110          600
                                                                                  600
                                                                                          10. 2     18.0

                                                                                                    19. 0
                                                                                                               13. 8 Rock................ Rock------------------
                                                                                                               12.0     Rock, piles in sand..._ Piles in sand _-,__-
                                                                                                                                                                          100
                                                                                                                                                                         1144
                                                                                                                                                                          1o 65
                                                                                                                                                                                    -...              4, 702, 000. 00
                                                                                                                                                                                                      6, 663, 000. 00
Lock and dam no. 24__     273.4    Clarksville, Mo _ ...             110                  15.0
Lock and dam no. 25__     241.4    Cap Au Gris, Mo_-_                110          600     15.0      19. 0      12. 0    Piles in sand and Piles in sand and
                                                                                                                          gravel.                 gravel.
                                                                                                                                                                         10100
                                                                                                                                                                                   I.--               7,800,000.00

Lock and dam no. 26__     202. 9   Alton, Ill- ....                  110
                                                                     110
                                                                                  600
                                                                                  360
                                                                                        1420.0
                                                                                          20. 0
                                                                                                  1532. 0
                                                                                                    16. 0
                                                                                                            16 14. 0
                                                                                                               14.0    IPiles in sand...------  Piles in sand .... __.. 1 1189                       13,110, 000. 00

      Total locks and                                                                                                                                                                               147,  539. 26
                                                                                                                                                                                                       629,                o
       dams.

                                                                            ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT
St. Paul Harbor improvement.................................................-------------------------                                                                                                  298, 780.
                                                                                                                                                                                                    17$298,       77------------------------
                                                                                                                                                                                                             780. 77
Minneapolis turning basin_ __1---9 ---------                                                          -----------------------------------------------------------------------                                8--4---------------------------
                                                                                                                                                                                                      6 192, 841.13
Dredging....------------------------------------------------------------------------------                                       --------------------------------------                              1,100, 000.00
Regulating works between lock and dam no. 26 and the Missouri River---------------------------------......................                                                                                                      623, 000. 00
                                                                                                                                                                                              --------.........................................--............................
Rectification of damages to drainage and levee districts............................................................--------------------------------. ----------------------------------------------------- 2,515.          2,         566. 00
Miscellaneous                 .............................................................................................................................
                               ---------------------------------------------------------------------------------------------------------------------..                                                                          640,
                                                                                                                                                                                                                                  , 74.         4
                                                                                                                                                                                                                                      272.....................................
        Total additional features               ___                                                                                                                                                                                    370, 460.
                                                                                                                                                                                                                                    5, 370, 460.74------------------------
        Total existing project----------------------------------------------------------------------------------------------                                                      ..       .......--------------------------- 1 153, 000, 000. 00

     1 Lifts, and depths on miter sills, based on completion of all locks and dams.
      2Total estimated flowage damages, including clearing, surveys, and Government costs, $23,800,000.
     3 Pool elevation, 723.1, elevation with flashboards, 725.1.
     SOld upper guard sill.
     85 In addition, $1,948,772.95 was expended from previous projects and $1,349,557.78 from operating and care appropriation for reconstruction of first of twin locks.
       Actual cost.
      7Proposed auxiliary lock.
      8 Not including second lock.
      9 Includes $2,000,000 for auxiliary lock. In addition, $1,965,316.22 was expended from previous projects.
     10 Lock.
     11 Dam.
    12Existing Le Claire Canal lock will be used as auxiliary to lock no. 14; previous project costs, $540,000.
    13In addition, cost of $640,868, for first lock, was reported by the Mississippi River Power Co., transferred to Government free in lieu of improvements destroyed (A. R. 1928,                                                                        O
pp. 1118 1119). Present estimate includes $2,825,000 for auxiliary lock.
    14Lift above possible future pool. Lift at extreme low water 25.2 feet.
    15Depth.over upper poiree sill.
    16Based on possible future pool.
    17Includes $40,000, contributed funds.
    18In addition, costs to date were $1,257,493.94 under the allotment for examinations, surveys, and contingencies,covering the original 9-foot survey and preliminary designs and plans
incident to the project.




                                                                                                                                                                                                                                                           00;
922     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Local cooperation.-Fullycomplied with below the Northern Pacific
Railway bridge at Minneapolis. While the River and Harbor Act of
August 26, 1937, authorizing the extension of the 9-foot channel above
St. Anthony Falls contains no specific requirements as to local co-
operation, substantial bridge revisions are involved which are in
general the responsibility of local interests.
   Terminal facilities.-A complete list of terminals available to the
public on the Mississippi River between the mouth of the Ohio River
and Minneapolis, Minn., as of March 1, 1935, can be obtained from the
division engineer, Upper Mississippi Valley Division, St. Louis, Mo.

            OPERATIONS AND RESULTS DURING    FISCAL YEAR

   Mouth of Wisconsin River to Minneapolis, Minn. (St. Paul dis-
trict)-Regular funds-New woork-Lock and dam above Hastings,
Minn. (no. 2).-A     contract for channel dredging, entered into Octo-
ber 27, 1936, was 58 percent completed. Costs for the year were
$123,881.74.
   Lock and dam above Red Wing, Minn. (no. 3).-A contract for
the construction of the dam was entered into January 8, 1937. At
the end of the fiscal year all preliminary work had been done, coffer-
dam constructed and unwatered, and pile driving commenced. The
contract was 26 percent, completed. A contract for furnishing and
delivering a locomotive crane, entered into October 12, 1936, was
80 percent completed. Contracts were completed as follows: Dredg-
ing lower lock approach, June 5, 1937; construction of spot dikes,
November 28, 1936; dredging at the dam by two leased dredges,
September 24 and November 9, 1936, respectively; and furnish-
ing and delivering derrickstone stock pile. The costs for the year
were $1,064,998.92.
   Lock and dam above Alma, Wis. (no. 4).-A contract for the con-
struction of lockkeepers' dwellings, entered into April 16, 1937, was
10 percent completed. A contract for the construction of a store-
house, entered into October 9, 1936, was 93 percent completed. Con-
tracts were completed as follows: Construction and installation of
service bridge walkway extension, June 10, 1937; construction and
installation of crane contact rail guard and screen system, June 21,
1937; and furnishing and delivering an emergency bulkhead. The
costs for the year were $18,856.06. Construction of check dams for
protection of storm sewer with Government plant and hired labor
was 85 percent completed. The costs for the year were $7,033.39.
   Lock and darn above Fountain City, Wis. (no. 5.) .- A contract for
the construction of a storehouse, entered into October 9, 1936, was 93
percent completed. Contracts were completed as follows: Construc-
tion of a footbridge, June 14, 1937; construction and installation of
service bridge walkway extension, June 10, 1937; construction and
installation of crane contact rail guard and screen system, June 21,
1937; drilling a well, June 17, 1937; and furnishing and delivering
an emergency bulkhead. The costs for the year were $27,573.97.
Filling esplanade with Government plant and hired labor was com-
pleted December 5, 1936, at a cost of $7,712.49.
   Lock and dam above Winona, Minn. (no. 5A).-Contracts were
completed as follows: Construction of an earth protection dike,
March 8, 1937; construction of an earth protection dike at the United
         RIVERS AND HARBORS--UPPER MISSISSIPPI RIVER               923
States boatyard, Fountain City, Wis., January 28, 1937; drilling a
well, June 17, 1937; and furnishing and delivering an emergency
bulkhead. The costs for the year were $80,634.23. Construction of
stage recorder houses with Government plant and hired labor was
completed September 22, 1936, at a cost of $1,358.36.
   Lock and dam below Trempealeau, Wis. (no. 6).-A contract for
the construction of a storehouse, entered into October 9, 1936, was
93 percent completed. Contracts were completed as follows: Drill-
ing a well, June 17, 1937; and furnishing and delivering an emer-
gency bulkhead. The costs for the year were $11,067.89. Construc-
tion of stage recorder houses with Government plant and hired labor
was completed September 28, 1936, at a cost of $1,210.02.
   Lock and dam above La Crosse, Wis. (no. 7).-A contract for
furnishing and delivering a locomotive crane, entered into October
12, 1936, was 80 percent completed. Contracts were completed as
follows: Construction of channel markers, November 20, 1936; clear-
ing of parcels nos. 8, and 10 to 15, inclusive, in the pool area, Febru-
ary 18, 1937; and furnishing and delivering riprap stone stock pile.
The costs for the year were $346,854.10. Construction of stage
recorder houses with Government plant and hired labor was com-
pleted January 21, 1937, at a cost of $2,197.07.
   Lock and dam below Genoa, Wis. (no. 8).-A contract for furnish-
ing and delivering a locomotive crane, entered into October 12, 1936,
was 80 percent completed. Contracts were completed as follows:
Construction of channel markers, December 15, 1936; clearing of
parcels nos. 2 to 15, inclusive, in the pool area, March 2, 1937; and
furnishing and delivering riprap stone stock pile. The costs for the
year were $732,964.74. Construction of stage recorder wells and
houses with Government plant and hired labor was completed Novem-
ber 27, 1936, at a cost of $3,612.05.
   Lock and dam below Lynxville. Wis. (no. 9).-A contract for the
construction of the dam was entered into July 15, 1936. At the end
of the fiscal year the taintor gate section was completed, cofferdam
no. 2 constructed and unwatered, pile driving completed, and concrete
operations commenced. The contract was 62 percent completed. A
contract for the construction of an earth dike, entered into July 29,
1936, was 53 percent completed. A contract for the construction and
installation of the power, control, and lighting system, entered into
November 24, 1936, was 33 percent completed. A contract for fur-
nishing and delivering a locomotive crane, entered into October 12,
1936, was 80 percent completed. A contract for furnishing and de-
livering derrick stone stock pile was completed. The costs for the
year were $1,479,994.79. Clearing of parcels nos. 1 to 4, inclusive, in
the pool area, commenced December 22, 1936, with Government plant
and hired labor, was 64 percent completed, at a cost of $149,450.23.
   Miscellaneous.-Field and office work in connection with surveys
for pool no. 9, land and flowage acquisition, designs of various struc-
tures, and other miscellaneous work were carried on throughout the
year by Government force.           The costs during the year were
 $247,559.49.
   Maintenance.-Maintenance channel dredging was done at 73 lo-
calities by hired labor with Government plant. A total of 2,612,304
cubic yards of material was removed, resulting in a depth of 3.5
feet at extreme low water in open unregulated sections, 5 feet at
924      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

lowest controlled pool in the section, Hastings to head of Lake Pepin,
and 7 feet at lowest controlled pool in the section, head of Lake
Pepin to lock and dam no. 5. In addition, 2,198 cubic yards of
material were removed by contract at lock and dam no. 5A. The
total cost of maintenance dredging during the fiscal year was $293,-
925.80. Laying of rock and brush protection mattresses below regu-
lating sections at dams nos. 4 and 5 was commenced July 11, 1936,
and completed September 21, 1936. A total of 17,442.2 cubic yards
of rock and brush was placed, at a cost of $32,604.28. Maintenance
of channel aids to navigation, maintenance of river gages, stream
gaging, and surveys in pool no. 2 were carried on during the year at
a cost of $39,723.67.
   Operating and care.-The locks and dams were operated as re-
quired and the necessary repairs made thereto and to the appurte-
nant structures at a cost of $203,230.93.
   Public Works funds-New work-Lock and dam above Alma, Wis.
 (no. 4).-A contract for the construction of a footbridge was com-
pleted February 18, 1937, at a cost of $8,950.21. Removal of a por-
tion of the backfill behind the lower guide wall with Government
plant and hired labor was completed November 3, 1936, at a cost of
$1,815.94.
   Lock and dam above Winona, Minwn. (no. 5A).-Contracts were
completed as follows: Construction of the dam, August 31, 1936;
construction and installation of the power, control, and lighting sys-
tem, September 3, 1936; construction of channel markers, September
10, 1936; and clearing parcels nos. 6 and 7 in pool area, July 11,
1936. The costs for the year were $91.244.27.
   Lock and dam below Trempealeau, Wis., (no. 6).-Contracts were
completed as follows: Construction of the dam, August 20, 1936;
construction and installation of the power, control, and lighting sys-
tem, October 19, 1936; and construction of channel markers, Septem-
ber 10, 1936. The costs for the year were $81,986.02.
   Lock and dam above La Crosse, Wis. (no. 7).-Relocating of lock
operating machinery and miter gate alterations with Government
plant and hired labor were completed September 22, 1936, at a cost
of $6,653.21.
   Miscellaneous.-Field and office work in connection with surveys
in pool no. 5A, and land and flowage acquisition were completed June
30, 1937, by Government force. The costs during the year were
$427,720.29.
   Emergency relief funds-New work-Lock and dam above Red
Wing, Minn. (no. 3).-The contract for the construction of the lock
was completed April 13, 1937. The costs for the year were
$1,335,281.35.
   Lock and dam above Winona, Minn. (no. 5A).-The contract for
clearing parcels nos. 3 to 5, inclusive, in the pool area was completed
July 18, 1936. The costs for the year were $13,018.39.
   Lock and dam above La Crosse, Wis. (no. 7).-Contracts were
completed as follows: Construction of the dam, April 7, 1937; con-
struction of an earth dike, October 13, 1936; construction and instal-
lation of the power, control, and lighting system, June 5, 1937; and
construction of Onalaska Dam, December 15, 1936. The costs
for the year were $983,071.68.
                RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                                                            925
   Lock and dam below Gewoa, Wis. (no. 8).-Contracts were com-
pleted as follows: Construction of the dam, April 30, 1937; con-
struction of an earth dike, December 22, 1936; and construction and
installation of the power, control, and lighting system, June 21, 1937.
The costs for the year were $1,502,799.21.
   St. Paul Harbor.-The contract for the improvement of the Missis-
sippi River and harbor at St. Paul, Minn., was completed October
31, 1936. The costs for the year were as follows: Government funds,
$61,145.46; contributed by city of St. Paul, $9,321.16; total $70,466.62.
   Miscellaneous.-Field and office work in connection with surveys
for pools nos. 3 and 9, and land and flowage acquisition were com-
pleted during the fiscal year by Government force. Miscellaneous
costs during the year were $22,894.82.
   The costs and expenditures (St. Paul district), during the fiscal
year, exclusive of $9,321.16 contributed funds expended for new work,
were as follows:

                                                                            Regular            Public        Emergency
                                                                            Regular            Works           Relief            Total
                                                                             funds             funds           funds


Costs:
   New work_-_____-_       _         __..---___                       _ $4, 306, 959. 54     $618, 369. 94 $3, 918, 210. 91 $8, 843, 540. 39
   Maintenance.._______. __          ____________                           366, 253. 75     _________     _________      __    366, 253. 75
   Operating and care_____---....----__                                     203, 230. 93 -    ____________   __---_----_        203, 230. 93
         Total costs-.......         __
                                   --.....     .       --......       .   4, 876, 444. 22     618, 369. 94   3, 918, 210. 91   9, 413, 025. 07
            _-.-
Expenditures--           -     . --__-.      -..   -        __._.-
                                                                -__       4, 538, 840. 54     869, 544. 66   4, 548, 932. 56   9, 957, 317. 76



   Clarksville, Mo., to mouth of Wisconsin River (Rock Island dis-
trict)-Regular funds--New work-Lock and dam at Guttenberg,
Iowa (no. 10).-Contracts entered into on January 4, 5, and 7, 1937,
for clearing areas designated as parcels nos. 1, 2, and 3 and 4, respec-
tively, were 77, 67, and 64 percent completed on June 30, 1937. A
contract was entered into on December 31, 1936, for the construction
of esplanade works. At the close of the year the work was 72 per-
cent completed. The costs for the year were $173,441.50.
   Lock and dam above Dubuque, Iowa (no. 11).-Work under con-
tract entered into July 16, 1936, for construction and installation of
power, control, and lighting system was continued and, at the close
of the fiscal year, was 88 percent completed. A contract entered
into on February 17, 1937, for clearing of area designated as parcel
no. 1 was 60 percent completed. A contract entered into on Decem-
ber 31, 1936, for the construction of esplanade works was 26 percent
completed. The costs for the year were $120,103.38.
   Lock and dam at Bellevue, Iowa (no. 12) .- A contract was entered
into on August 17, 1936, for the construction of a roller- and tainter-
gate dam. Work in the first cofferdam was in progress in the placing
of concrete, erection of steel for tainter gates and service bridge, and
driving of sheet steel piling. The driving of timber piling in the
first cofferdam was completed. Wing dams were removed from the
dredging area, the site of the dike embankment was stripped and
the material placed in the fill. Dredging operations in the upstream
dredging area have been completed and the material placed in the
dike embankment. Dressing and grading of dike embankment was
926     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

in progress. At the close of the fiscal year the contract was 56 per-
cent completed. The costs for the year were $1,302,235.61.
    Lock and dam above Clinton, Iowa (no. 13).-A contract for the
construction of a roller and tainter gate dam was entered into on
January 23, 1937. Work in the first cofferdam was in progress in
the driving of piling, placing of concrete, and erection of steel work
for gates and service bridge. The right-of-way for the earth dike
was cleared and fill for embankment was in progress. At the close
of the fiscal year the contract was 41 percent completed. The costs
for the year were $888,919.72.
    Lock and dam below Le Claire, Iowa (no. 14).-A contract for
the construction of a roller and tainter gate dam was entered into
on November 16, 1936. Work in the first cofferdam was in progress
in the excavation of rock, driving of piling, and placing of concrete.
The work under the contract was 35 percent completed. The costs
for the year were $784,335.03.
    Lock and dam at Rock Island, Ill. (no. 15).-On January 18,
1937, a contract was entered into for the excavation and disposal
of approximately 193,100 cubic yards of rock and about 101,300
cubic yards of common excavation. Operations began March 20,
1937, and at the close of the year the work under the contract was
about 26 percent completed. The costs for the year were $150,923.16.
   Lock and dam above Mus.catine, Iowa (no. 16).-Contracts were
entered into on January 2, 1937, and April 7, 1937, for clearing
areas designated as parcels nos. 1 and 2. At the close of the year the
work in parcel no. 1 was 41 percent completed and in parcel no. 2
it was 39 percent completed. A contract for clearing 5 acres of
Government land and placing 8,000 cubic yards of levee protection,
entered into on March 22, 1937, was 79 percent completed. A con-
tract entered into on December 31, 1936, for the construction of
esplanade works was 71 percent completed. The costs for the year
were $99,460.42.
   Lock and dam above New Boston, Ill. (no. 17).-A contract was
entered into on February 5, 1937, for the construction of a roller and
tainter gate dam and central control station. Work within the first
cofferdam consisted in driving test piling, excavation work, and the
driving of permanent steel piling. Construction of the earth dike
area was in progress. At the close of the fiscal year the contract was
16 percent completed. The costs for the year were $387,163.27.
   Lock and dam above Burlington, Iowa (no. 18).-A contract en-
tered into July 6, 1936, for power, control, and lighting system was
90 percent completed. The construction of remedial works, con-
tract for which was entered into on August 31, 1936, was completed
on June 27, 1937. The costs for the fiscal year were $296,301.62.
   Lock and dam above Canton, Mo. (no. 20).-Remedial works con-
sisting of 1,125 feet of shore protection along the right bank of the
river at miles 347.3 and 348.6 were completed by hired labor and
Government plant at a cost of $9,499.58. A contract entered into on
December 31, 1936, for the construction of esplanade works was 56
percent completed at a cost of $10,428.59.
   Lock and dam below Quincy, Ill. (no. 21).--A contract was en-
tered into on August 6, 1936, for the construction of a roller- and
tainter-gate dam and levee. All work within the first cofferdam area
        RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                927

was completed. Common excavation within the second cofferdam
was completed and pile driving was in progress. Wing dams in
the dredging area have been removed and the spoil placed in coffer-
dam embankment. The construction of the earth dike was in prog-
ress. The contract was 74 percent completed. The contract for
power, control, and lighting system, entered into March 5, 1937, was

                                                V).--A
3 percent completed. The costs for the year were $1,552,757.76.
   Lock and dam below Saverton, Mo. (no.                   contract was
entered into August 28, 1936, for the construction of a roller- and
tainter-gate dam and levee. Rock excavation and channeling within
the first cofferdam was completed. The placing of concrete in the
gate piers and the construction of the levee on the Illinois shore
were in progress. The contract was 44 percent completed. The
installation of power, control, and lighting system covered by con-
tract entered into on March 17, 1937, was 7 percent completed. The
costs during the fiscal year were $1,027,167.67.
   Miscellaneous.-Contracts were entered into for furnishing ab-
stracts of title to lands in various pools. Surveys in connection with
land and flowage acquisition, stream gaging, etc.; engineering studies
on structures under way; minor hired labor jobs; and minor work
in connection with contracts entered into just prior to the close of
the fiscal year were carried on by Government force at a cost of
$787,927.84.
    Maintenance.-Eight pipe-line dredges, one dipper dredge, and
two derrick boats were engaged in channel maintenance work at
157 localities. The total channel dredged had a length of 59 miles
with widths varying from 100 to 400 feet. A total of 2,519,866.9
cubic yards of material was removed at a cost of $426,675.34.
    Maintenance of channel aids to navigation, sweeping rock cuts,
snagging, and minor undertakings incident to completion of various
locks were carried on during the year at a cost of $38,593.09.
    Removal of obstructions in Rock River, Illinois.--A total of 820
snags and stumps was removed from Rock River above Sterling
Dam by hired labor with Government plant under authority of
section 3, River and Harbor Act of July 3, 1930. The cost of the
work was $250.
    Operating and care.-The locks and dams were operated as re-
quired and the necessary repairs made thereto and to the appurte-
nant structures at a cost of $170,881.48.
    Public Works funds-New Work-Lock and dam at Guttenberg,
Iowa (no. 10).-Contracts were completed as follows: Construc-
tion of dam, December 15, 1936; construction of locomotive crane,
October 26, 1936; and installation of power, control, and lighting
system, April 12, 1937. The costs for the year were $291,099.56.
    Lock and dam above Muscatine, Iowa (no. 16) .- Contracts were
completed as follows: Construction of dam, February 2, 1937; con-
struction of locomotive crane, October 26, 1936; and installation of
power, control, and lighting system, April 2, 1937. The costs for the
year were $439,966.59.
    Lock dwellings.-The preparation of plans and specifications for
the construction of lockkeepers' dwellings and garages at locks and
dams nos. 5, 5A, 6, 8, 10, 11, 16, 18, and 20 was in progress.
     20196-37-pt. 1-   59
928             REPORT OF CHIEF. OF ENGINEERS, U. S. ARMY, 1937

   Surveys, engineering, etc.-Extensive surveys in connection with
flowage areas, land acquisition, stream gaging, etc., engineering stud-
ies on structures under way, and miscellaneous hired labor jobs were
carried on with Government force. The costs for the year were
$101,331.26, including minor costs on contracts completed in prior
fiscal year.
   Emergency Relief funds-New work-Lock and dam above Du-
buque, Iowa (no. 11).-Contracts were completed as follows: Con-
struction of dam, May 15, 1937, and alterations to Eagle Point
Bridge, August 12, 1936. The costs for the year were $1,48 7,444.14.
   Lock and dam above Clinton, Iowa (no. 13).-The construction of
the lock by contract was completed on December 28, 1936. The cost
for the year was $1,032,934.27.
   Lock and dam below LeClaire, Iowa (no. 14).-The contract for
the construction of the lock was completed on November 22, 1936.
The cost for the year was $549,915.20.
   Lock and dam above New Boston, Ill. (no. 17).--The contract for
the construction of the lock was completed on February 13, 1937.
The cost for the year was $892,171.87.
   Lock and dam above Burlington, Iowa (no. 18) .- Contracts were
completed as follows: Construction of dam, May 14, 1937, and diver-
sion of Henderson River, September 23, 1936. The costs for the year
were $1,443,634.49.
   Surveys and engineering in connection with land and flowage ac-
quisition and structures under way, and miscellaneous hired labor
jobs at various localities were carried on with Government force at a
cost of $104,648.91.
   The costs and expenditures (Rock Island district) during the fiscal
year were as follows:

                                                         Regular            Public         Emergency
                                                          funds             Works            Relief              Total
                                                                            funds            funds


Costs:
    New work_           _ _______________      _ $7, 590, 665. 15         $832, 397. 41 $5, 510, 748. 88 $13, 933, 811. 44
    Maintenance________ ______________________       465, 518. 43               ____ ______________           465, 518. 43
    Operating and care ___                           170, 881. 48                                             170, 881. 48
         Total costs_____   ________
                                  _____________        8, 227, 065. 06     832, 397. 41    5, 510, 748. 88   14, 570, 211. 35
Expenditures...--.......----------------------......   7, 284, 337. 75   1, 213, 382. 91   6, 553, 703. 68   15, 051, 424. 34



   Missouri River to Clarksville, Missouri (St. Louis District)-Reg.
ular funds-New work-Lock and dam at Clarksville, Mo. (No.
24).-Work     under the contract for the lock was continued and during
the fiscal year all cofferdam work, the upper guide wall, and practically
all the common and rock excavation were completed. Work was well
under way on earth fill and placing of concrete. The contract was
65 percent completed at a cost of $1,016,840.55. Land acquisition,
flowage surveys, and preliminary and miscellaneous work were con-
tinued at a cost of $39,350.03.
   Lock and dam at Cap au Gris, Mo. (No.              total of 350 acres
of land was cleared under contract at a cost of $4,034.04, and 45 acres
                                                                           25).-A
of land was cleared and 240,283 cubic yards of earth removed by
         RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                 929
hired labor dredging at a cost of $22,119.66. Contracts were let for
constructing 3 sections of earth dike at Bradley Island and 50 percent
of this work was completed at a cost of $120,303.17. One section was
completed by hired labor at a cost of $42,421.18. Land acquisition,
flowage surveys, and preliminary and miscellaneous work were con-
tinued at a cost of $114,784.78. Contract was entered into May 21,
1937, for construction of the dam, but no work was done.
   Lock and dam at Alton, Ill. (No. 26).-The auxiliary lock coffer-
dam, which failed early in 1936, was removed by hired labor at a
cost of $82,872.46, which included the removal of 244,229 cubic yards
of material by hydraulic dredge. A total of 104,515 cubic yards was
dredged for the contractor for which reimbursement was received.
Land acquisition, flowage surveys, preliminary and miscellaneous
work, and Government costs on the lock and dam contract were
continued at a cost of $496,487.03.
   Maintenance.-Channel dredging was done at various localities
with United States dredges. A total of 3,685,324 cubic yards of ma-
terial was removed from 49 bars, of which 46 were dredged once, 2
were dredged twice, and 1 was dredged three times, and a total of
274,027 cubic yards of material was removed in outside-the-channel
dredging. The total cost of dredging was $255,568.08. Several old
revetments and dikes were removed by dipper dredge, involving
moving of 13,681 cubic yards of material at a cost of $9,730.70. Aids
to navigation and driving mooring piles cost $10,324.61. Hydraulic
surveys were made of 57 miles of river at a cost of $14,484.73.
   Public Works funds-New work--Lock and dam at Alton, Ill.,
 (No. 26).- Contract was entered into on September 30, 1936, with
the contractor building the dam, for completion of the main lock
and construction of the auxiliary lock, original contract for which
was terminated April 9, 1936. Progress on the principal items of
work was as follows: All cofferdam construction and about 90 per-
cent of pile driving were completed; and about 80 percent of fill,
50 percent of concrete, and 50 percent of embedded metals were
placed. The job as a whole was about 55 percent completed during
the fiscal year at a cost of $512,658.36. Work under the contract for
the construction of the dam was continued during the fiscal year,
the principal items of which were: All cofferdam construction and
practically all pile driving were completed; all the roller gates, 95
percent of operating machinery, and about three-fourths of the
tainter gates and gate operating machinery were placed; and about
95 percent of the service bridge was erected. The job as a whole was
advanced about 50 percent during the fiscal year at a cost of $2,248,-
330.30. Preliminary and miscellaneous work by hired labor and
contracts for abstracts of title were completed at a cost of $16,111.80.
Costs of flowage surveys amounting to $145,759.44 were transferred
to regular funds during the year, making a net total cost of
$2,631,341.02.
   Emergency Relief funds-New work--Lock and dam at Cap Au
Gris, Mo. (No. 25).-The contract for construction of the lock was
completed May 11, 1937. The cost for the year was $1,645,967.55.
930              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The costs and expenditures (St. Louis district) during the fiscal
year were as follows:

                                                                   Regular             Public    Emergency                     Total
                                                                    funds            Works funds Relief funds

Costs:
    New work -.....................---...------------------.---....... $1,939, 212. 90 $2, 631, 341. 02 $1, 645, 967. 55    $6, 216, 521. 47
     Maintenance--------------------------                         290, 108. 12 --------------------------                     290, 108. 12
         Total costs----------------.--------------              2, 229, 321. 02     2, 631, 341. 02    1, 645, 967. 55      6, 506, 629. 59

Expenditures--....--------------------...........                2, 192, 168. 29     2, 620, 055. 32    1, 726, 485. 49      6, 538, 709. 10



  The costs and expenditures for the three sections during the fiscal
year, exclusive of $9,321.16 contributed funds expended for new
work, were as follows:
                                                                 Regular
                                                                    funds             Public           Emergency               Total
                                                           Regularfunds            Works funds         Relief funds

Costs:
     New work------------.-----------$13,836, 837. 59 $4, 082, 108. 37 $11, 074, 927. 34                                   $28,993, 873. 30
       aintenance-----..........................---------------------- 1, 121, 880. 30 ---------------------------           1, 121, 880. 30
     Operating and care-....---....------....---------.........          374, 112. 41      .----------------------------       374, 112. 41
         Total costs........-----...-----------------       15, 332, 830. 30       4, 082, 108. 37     11, 074, 927. 34     30, 489, 866. 01

Expenditures -----.--------------------
                       .                                    14, 015, 346. 58       4, 702, 982. 89     12, 829, 121. 73    31, 547, 451. 20



                                    CONDITION AT END OF FISCAL YEAR

  The 9-foot canalization project, as a whole, is about 67 percent
completed.
  Mouth of Wisconsin River to Minneapolis, Minn. (St. Paul Dis-
trict).-The Minneapolis turning basin, dredging of the upper limits
of pool no. 2, widening of the channel at the St. Paul terminal, im-
provement of the harbor at St. Paul, channel realinement at Crooked
Slough, channel markers in pools nos. 4, 5, 5A, 6, 7, and 8, clearing
pool areas nos. 4, 5, 7, and 8, lock and dam no. 1, lock and dam no.
2 (except auxiliary lock), locks and dams nos. 4, 5, 5A, 6, 7, and 8,
and locks nos. 3 and 9 have been completed.
  Work was in progress on the construction of dam no. 3, above Red
Wing, Minn.; dam no. 9, below Lynxville, Wis.; channel dredging,
pool no. 2; hired labor clearing in pool no. 9; and stream gaging and
surveys for land and flowage acquisition. For percentages of com-
pletion of locks and dams, see table under paragraph "Existing
project." Flowage surveys for pools of locks and dams have been
completed.
  Land and flowage acquisition.-Paymentshave been made for the
acquisition of fee simple title to or flowage easement on 25,410 acres
for flowage purposes and fee simple title to 1,847 acres for lock, dam,
and dike sites. In addition, court orders have been obtained for the
immediate possession of 20,514 acres (fee simple title or flowage ease-
ment) for flowage purposes and 806 acres in fee for lock, dam, and
dike sites.
                    RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                                                     .931

      The following table gives the condition of channel June 30, 1937:

                                          *         Length Affording Affording Affording Projected Control-
                         Section                    Legth
                                                      of       over 9    6 to 9   lesst
                                                                                  less than Pr6otoe9
                                                                                             channel       tl
                                                                                                         ling
                                                               feet at
                                                         section         feet at 6 feet at width 1depths
                                                             low water low water low water

Northern Pacific R. R. bridge to locks and          Miles           Miles           Miles          Miles                          Feet
dam no. 1 2-.--_                  _5.                        4          5.4            0             0      ..........                 9. 0
Locks and dam no. 1 to Omaha Bridge 3....                  6. 2          4.2            2. 0          0                                 8. O0
Omaha Bridge to lock and dam no. 2 3.... _                26. 2         25. 6           0. 6          0                                 8. O0
Lock and dam no. 2 to foot of Lake Pepin 3.               50. 3         39. 3          10. 1          0. 9   ..........                 7. 5
Foot of Lake Pepin to lock and dam no. 5 3_               26. 8         26. 6           0. 2          0                                 7. 5
Lock and dam no. 5 to Winona 3         ___.......         12.5          12. 5           0             0      ..........                 8. 0
Winona to Genoa 3-----------------
                   _                                      46. 1         45.9            0.2           0       .........-                8. 0
Genoa to Wisconsin River 4-.                  -     -     48. 5         20. 5          26. 0          2. 0 .         __......           7. 5
         Total. ...----.----------------.           - 222. 0           180. 0          39. 1          2. 9 .-----

   1 Suitable widths maintained for long-haul common-carrier service.
   2 Based on pool elevation of 723.1 mean sea level, crest of dam, instead of 725.1, top of flashboards, as here-
tofore reported.
   3Based bn lowest controlled pools from locks and dams nos. 2, 4, 5, 5A, 6, 7, and 8 to control point, and on
flat pool from control point up.
  4   Based on 1936 low water.


  The total costs and expenditures, under the existing project (St.
Paul district) to June 30, 1937, exclusive of $40,000 contributed funds
expended for new work, were as follows:

                                                    Regular funds
                                                         Regular
                                                            funds           Public Works
                                                                                funds               Emergency
                                                                                                    Relief funds                Total


Costs:
      New work_____...  .-----------------              $10, 062, 062. 12 $20, 134, 500. 00 $9, 066, 724. 01 $39, 263,286. 13
      Maintenance_---__-_-__---___.---                    2, 279, 495. 46 ..----------------------          . 2, 279, 495. 46
      Operating and care-....--.. _--_--___                 340, 759. 89 ...---------------------------           340, 759. 89

         Total costs.__-----------------------           12, 682, 317. 47       20, 134, 500. 00    9, 066, 724. 01        41, 883, 541. 48

Expenditures_ .............................              12, 318, 742. 82       20, 130, 733. 72    9, 042, 528. 40        41, 492, 004.94



   In addition, the sum of $1,748,408.66 was expended between 1917
and 1936 on the operation and care of the works of improvement
under the provision of the permanent indefinite appropriation for
such purposes.
   Clarksvnille, Mo., to Mouth of Wisconsin River (Rock Island dis-
trict).-Locks and dams nos. 10, 11, 15, 16, 18, and 20, locks nos. 12,
13, 14, 17, 21, and 22, alterations to Eagle Point Bridge and diversion
of Henderson River have been completed. Work was in progress on
the construction of dams nos. 12, 13, 14, 17, 21, and 22; clearing in
pools nos. 10, 11, and 16; rock excavation in pool no. 15; remedial
works, consisting of clearing and levee protection, in pool no. 18;
esplanade works at locks and dams nos. 10, 11, 16, and 20; the furnish-
ing of abstracts of title to lands required for Government use in
Dubuque and Clinton Counties, Iowa; Adams and Pike Counties,
Ill.; and Lewis County, Mo.; surveys for land and flowage acquisition,
stream gaging and engineering; repair of dikes and shore protection;
pipe-line dredging and operating and care of canal, locks, and dams.
   For percentage of completion of locks and dams, see table under
paragraph "Existing project."
932               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Land and flowage acquisition.-Seven condemnation suits for the
acquisition of land were completed during the fiscal year. Twenty-
five suits were pending at the close of the year.
   During the fiscal year court orders were obtained in 21 condemna-
tion suits granting the United States immediate possession of 605.09
acres for dam and abutment sites, 3.01 acres for power line to lock,
and 10,025.02 acres for flowage area.
   Permission was obtained to occupy and use as a dam and abut-
ment site 86.05 acres of land owned by the Department of Agricul-
ture; and 77.7 acres of land were acquired for flowage area by patent
from the State of Iowa. One roadway crossing on railroad right-
of-way was secured.
   The following table gives the condition of the channel June 30,
1937:

                                                                              Afford-    Afford-       Afford-          Pro-
                                                               Length        ing over    ing 6 to     ing less            ted        Control-
                         Section                               of sec-        9 feet      9 feet     than 6 feet    c                    ling
                                                                tion     I    at low     at low        at low       width            depths a
                                                                              water      water         water

                                                                Miles         tliles      Miles        Miles                             Feet
Wisconsin River to Rock Island Rapids..                             134. 4      117. 0       16. 6         0. 8 .--------                       5. 5
Rock Island Rapids to Rock Island_ _..--                             13.7        12. 2        1. 5         0    .........                       7. 6
Rock Island to Keokuk ---------.........--------                    118. 6      109. 3        8. 6           .7 --..------                      5. 3
Keokuk to Hannibal              .............-------------------- 54.4           42. 9       10. 5         1.0 ........                         5. 0
Hannibal to Clarksville--........--                ....------------- 36. 9       23. 0       12. 9         1.0 ........                         4.9
         Total......_.        _...        -........_._..          358.0        304. 4        50.1          3. 5 ..         ..     ....             .

  1 Revised mileage measured along a midchannel line established in 1931.
S Suitable widths maintained for long-haul common-carrier service.
3 Since reefs (shoal areas) rise as the river rises and fall as the river falls, the controlling depth, in years
when there is no extreme low water, can be determined only approximately.

   During April, May, and June, a draft of approximately 7 feet
is usually practicable with a gage reading of 5 feet (above 1864
low water). During July, August, September, and October, the
gage reading is usually above 2 feet. At such times, and even when
the gage is lower, a 5-foot draft is usually practicable.
   The total costs and expenditures under the existing project (Rock
Island district) to June 30, 1937, were as follows:

                                                           Regular funds        Public Works
                                                                                     funds           Emergency
                                                                                                     Relief funds                  Total


Costs:
     New work-.......-........_                   __ .  $15, 474, 605. 65 $21, 477, 350. 36 $11, 338, 678. 59                  $48, 290, 634. 60
     Maintenance...._____......                      __ -4, 276, 640. 48 ._         --------------
                                                                                 .........                 ...                   4, 276, 640. 48
      Operating and care .....----..--------..----              288, 705, 58 ......------------------------------                   288, 705. 58
         Total costs--       -----------------
                               ..       .......            20, 039, 951. 71      21, 477, 350. 36    11, 338, 678. 59           52, 855, 980. 66

Expenditures....----------------------16, 547, 829. 26                           21, 472, 044. 16    11, 199, 743. 72           49, 219, 617. 14



  In addition, the sum of $2,535,668.22 was expended between 1907
and 1936 on the operation and care of the works of improvement
under the provision of the permanent indefinite appropriation for
such purposes.
  Missouri River to Clarksville, Mo.-St. Louis district.-The exist-
ing channel in this stretch was maintained by dredging and iregu-
lating works. Lock no. 25, at Cap Au Gris, Mo., has been completed.
                   RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                                                                     933
Work was in progress on the construction of lock no. 24, above
Clarksville, Mo., and locks and dam no. 26 at Alton, Ill. Prelimi-
nary work was in progress in connection with the construction of
dam no. 25 at Cap Au Gris, Mo. Other work in progress consisted
of stream gaging and surveys for flowage and land acquisition.
Funds are available for partial construction of dam no. 24, work
to begin late in fiscal year 1938. For percentage of completion of
the locks and dams, see table under paragraph "Existing project."
  Land and flowage acquisition.-Condemnationwas recommended
on 140 tracts of land in pool no. 26 and immediate possession was
obtained on 103 tracts consisting of 7,500 acres.                                                               A total of 564 acres
was acquired for site of east abutment and approach of dam no. 25,
of which about 450 acres were for flowage.                                                             A total of 332 acres of
land was acquired for site of earth dike extending upstream from
lock no. 25. Acquisition of site for lock no. 24 was completed. Sur-
veys for above land acquisition were completed.
  The following table gives the condition of channel June 30, 1937:

                                                                     Length          Affording Affording Affording Projected                 Control-
                                                                                      over 9    6 to 9   less than channel                   cling
                                     Section                          of sec-         feet at   feet at   6 feet at width                    depths
                                                                                    low water low water low water


                                                                      Miles          Miles         Miles          Miles                         Feet
Clarksville, Mo., to Illinois River---------.....                       55. 0          16. 0         38. 0           1. 0 ..........                   4
Illinois River to Missouri River .----------......                      23. 0          13. 4          9. 0            .6                               5
       Total_----------------------------                                   78. 0       29. 4         47. 0            1. 6

  1 Suitable widths maintained for long-haul common-carrier service.
  2 Lowest stages known, navigation season, occurred in fall, 1936.

  The total costs and expenditures under the existing project (St.
Louis district) to June 30, 1937, were as follows:

                                                                                Regular         Public Works Emergency                      Total
                                                                                 funds             funds     Relief funds


Costs:
   New work_    ---.    ____.__-__--      _ $2, 232, 928. 30 $9, 074,408. 01 $2, 437, 486. 46 $13, 744, 822. 77
   Maintenance....------------------------- 2,172, 319. 04 -.....---------.............-------------- 2,172, 319.04
       Total costs...........................-------------------------..     4, 405, 247. 34    9, 074, 408. 01    2, 437, 486. 46      15, 917, 141. 81
Expenditures....-_........................__                           ..    4, 214, 770. 04    8, 770, 316. 13    2, 437, 486. 46      15, 422, 572. 63



  The total costs and expenditures under the existing project, on the
three sections, to June 30, 1937, exclusive of $40,000 contributed funds
expended for new work, were as follows:

                                                               Regular funds           Public Works
                                                                                          funds               Emergency
                                                                                                                lief funds Re-            Total


Costs:
   New work- _..---.. ----- _                                  $27, 769, 596. 07       $50, 686, 258.37       $22,842,889.06         $101,298, 743.50
   Maintenance      _
                   --------------------                          8, 728,454.98       -----------------------------...                   8,728,454.98
     Operating and care__--------------                              629, 465.47 ..........              ...---.......---      .           629, 465. 47
       Total costs.....------------ -------                     37, 127, 516. 52        50, 686, 258.37        22, 842, 889. 06        110, 656, 663. 95
Expenditures...---...-------...--                               33, 081, 342. 12         50, 373, 094. 01      22, 679, 768. 58        106, 134, 194. 71
934        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  In addition, the sum of $4,284,076.88 was expended between 1907
and 1936 on the operation and care of the works of improvement
and $1,579,507.38 between 1888 and 1936 for operating snag boats on
upper Mississippi River and tributaries, under the provision of the
permanent indefinite appropriation for such purposes.
                                PROPOSED OPERATIONS

  Regular funds.-The balance unexpended, including accounts re-
ceivable at the end of the year, together with allotments totaling
$28,549,000 made since June 30, 1937, will be applied as follows:
Accounts payable, June 30, 1937----------------------------_               $1, 621, 418. 32
New work :
    Lock and dam no. 2 (Hastings) (by contract) :
        Construction of auxiliary lock (January
           1938 to April 1939) -_                     $2, 000, 000.00
        Complete channel dredging, pool no. 2
            (July to October 1937) ----------------       124, 800. 00
        Complete design of auxiliary lock (hired
            labor)                                          5,000. 00
                                                           7--------------------------------
         Miscellaneous --------------------------           2, 200. 00
                                                                             2, 202, 000. 00
    Lock and dam no. 3 (Red Wing) (by contract) :
        Complete construction of dam (continu-
           ing contract) (July 1937 to March 1938)_ 1, 120, 600. 00
         Installation of power, control, and light-
           ing (September 1937 to May 1938) _             123, 000. 00
         Complete purchase of locomotive crane
            (July 1937 to January 1938)     ----------     21, 700. 00
         Construction of channel markers (Sep-
           tember and October 1937)-----------               7, 000. 00
         Clearing pool area (August 1937 to Janu-
           ary 1938) (contract and hired labor)           159, 000. 00
         Acquisition of lands and flowage rights
            (hired labor)-------------------------        366, 700. 00
        Design of dam, finished structure draw-
           ings, etc. (hired labor) ---------------        15, 000. 00
         Purchase of lock and dam sites (hired
           labor)---------------------------------- 28, 300. 00
         Miscellaneous------------------------------        6, 700. 00
                                                                             1, 848, 000. 00
    Lock and dam no. 4 (Alma) (by contract) :
        Complete construction of lockkeepers' dwell-
           ings (July to November 1937)------------ 18, 800. 00
         Complete construction of check dams for pro-
           tection of storm sewers (hired labor)-0-- 6, 000. 00
         Purchase of electric hoist (September 1937 to
           April 1938) ----------------------------- 25, 000. 00
         Construction of parking area (August 1937 to
           February 1938)         -------------------      23, 600. 00
        Acquisition of lands and flowage rights
            (hired labor) --------------------------- 15, 000. 00
         Miscellaneous ----------------------------- 10, 200. 00
                                                                                 98, 600. 00
    Lock and dam no. 5 (Fountain City) (by con-
      tract) :
         Construction of lockkeepers' dwellings (Au-
           gust 1937 to April 1938) _----___-____ _ 21, 000. 00
         Purchase of electric hoist (September 1937 to
           April 1938)----------------------------- 25, 000.00
        Complete construction of access road (Wis-
            consin side) (July to October 1937)     -- ___.      2, 800. 00
         RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                          935
New work-Continued.
   Lock and dam no. 5, etc.-Continued.
       Construction of esplanade and landscaping
         (March to August 1938) (contract and
         hired labor) -------------------------- $20, 000.00
       Acquisition of lands and flowage rights
        hired labor) ----------------------       8'4, 00. 00
       Miscellaneous ------------------------ __  14, 400. 00
                                                                     $167, 800. 00
   Lock and dam no. 5A (Winona) (by con-
     tract) :
        Construction of lockkeeper's dwellings
          (August 1937 to March 1938)---------         21, 000. 00
       Construction of esplanade and landscap-
         ing (March to August 1938) (contract
         and hired labor) ---------------------
                             _26,                         000. 00
       Construction of underpass (October 1937
         to January 1938) ----------------------       12, 000. 00
        Purchase of lock and dam sites (hired
         labor) -------------------------------        27, 000. 00
        Acquisition of lands and flowage rights
          (hired labor) --------------------------    172, 800. 00
       Miscellaneous __-----         _____ _ _         14, 400. 00
                                                                      273, 200. 00
    Lock and dam no. 6 (Trempealeau) by con-
      tract) :
        Construction of lockkeepers' dwellings
           (August 1937 to May 1938) -----------       21, 000. 00
        Construction of esplanade and landscap-
           ing (March to August 1938) (contract
           and hired labor) ---------------------      20, 000. 00
        Purchase of lock and dam sites (hired
           labor) ----------     ---------------       15, 500. 00
         Acquisition of lands and flowage rights
           (hired labor) ----------------------       427, 200. 00
         Miscellaneous __--------------------- ----    11, 900. 00
                                                                      495, 600. 00
    Lock and dam no. 7 (La Crosse) (by con-
      tract) :
        Dredging at Dresbach Slough (January
           to November 1938) -------------------
                               _                      365, 000. 00
         Complete purchase of locomotive crane
           (August 1937) --------------- -------        5, 900. 00
         Construction of esplanade (initial fill)
           (September 1937 to November 1937)___        35, 000. 00
        Design, finished structure drawings, etc.
            (hired labor)----    _____----   _         20, 000. 00
         Acquisition of lands and flowage rights
            (hired labor) ------------------------    428, 300. 00
        Miscellaneous ------------------               11, 900. 00
                                                                      866,100. 00
    Lock and dam no. 8 (Genoa) (by contract) :
        Construction of lockkeepers' dwellings
           (August 1937 to May 1938)  ------------     21, 000. 00
        Complete purchase of locomotive crane
           (August 1937)_ ---------------------         6, 100. 00
        Construction of esplanade and landscap-
          ing (March to August 1938) (contract
          and hired labor) ----------------------      19, 000.00
        Design, finished structure drawings, etc.
           (hired labor) ------------------------      10, 000. 00
        Structural painting (hired labor)_______       12, 000. 00
        Acquisition of lands and flowage rights
           (hired labor) ------------------------     854, 400. 00
        Miscellaneous --------------------------       15, 000. 00
                                                                      937, 500. 00
936        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New work-Continued.
   Lock and dam no. 9 (Lynxville) (by con-
     tract) :
       Complete construction of dam (continu-
          ing contract) (July 1937 to June 1.938)_          $883, 500. 00
        Complete construction of earth dike (July
          to November 1937.------_ -- ____                   114, 500. 00
        Complete installation of power, control,
           and lighting (July 1937 to August 1938)-           76, 300. 00
        Purchase of locomotive crane (July to
          October 1937) ..                  _                 21, 800. 00
        Construction of channel markers (Sep-
           tember 1937 to January 1938) ........              27,000. 00
        Installation of automatic signal (April
          and May 1938)                                         4, 000. 00
        Design, finished structure drawings, etc.
           (hired labor)                                      22, 000. 00
        Clearing pool area (August 1937 to Jan-
          uary     1938)    (contract   and      hired
          labor)                                           1, 012, 600. 00
        Acquisition of lands and flowage rights
           (hired labor)-                                    554, 900. 00
        Purchase of lock and dam sites (hired
            labor)-                                            4, 200.00
          Miscellaneous                                        9, 000. 00
                                                                             $2, 729, 800. 00
      Lock and dam no. 10 (Guttenberg)          (by
        contract) :
          Construction of lockkeepers' dwellings
            (August 1137 to June 1.938)-                      16, 800. 00
          Construction of esplanade (July to Sept-
            tember 1937) -----------------------                5, 600. 00
          Construction of channel markers (Oc-
            tober 1937 to January 1938)       ---             20, 000. 00
          Clearing pool area (July to October
            1937) --------------------------                  84, 300. 00
          Acquisition of lands and flowage rights
            (hired labor)------------------                  120, 000. 00
          Protection stone ...     __                         20, 000. 00
          Miscellaneous -----------------------               10, 000. 00
                                                                                276, 700. 00
      Lock and dam no. 11 (Dubuque)                  (by
        contract) :
          Construction of lockkeepers' dwellings
             (August 1937 to June 1938)----------             16, 800. 00
          Complete installation of power, control,
            and lighting (July 1937)          -- --           15, 800. 00
          Construction of channel markers (Octo-
            ber 1937 to January 1938)_                        20, 000. 00
          Construction of esplanade (July to Sep-
            tember 1937)----------------------                14, 800. 00
          Purchase of locomotive crane             (July
             1937)      ---------------------                 24, 000. 00
          Clearing pool area (September 1937 to
            March 1938)_                                     656, 700. 00
          Acquisition of lands and flowage rights
             (hired labor) ----------------------            485, 000. 00
          Miscellaneous ---------------                       10, 000. 00
                                                                              1, 243, 100. 00
      Lock and dam no. 12 (Bellevue) (by contract) :
          Complete construction of dam (continu-
            ing contract) (July 1937 to Febru-
            ary 1938) ----------------------------         1, 150, 000. 00
          Complete installation of power, control,
            and lighting (August 1937 to April
            1938)_      ------------------                    125,000. 00
          Purchase of locomotive crane (Septenm-
            ber 1937 to March 1938)                           25, 000. 00
         RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                 937
New work-Continued.
   Lock and dam no. 12, etc.-Continued.
       Clearing pool area (January to July
        1938) -------------------------------           $250, 000. 00
       Acquisition of lands and flowage rights
         (hired labor) ----------------------            600, 000. 00
                                                                         $2, 150, 000. 00
   Lock and dam no. 13 (Clinton) (by contract) :
       Complete construction of dam (continu-
         ing contract) (July 1937 to February
         1939)--------------          ------------     1, 790, 000. 00
       Complete installation of power, control,
         and lighting (October 1937 to June
         1938)        __---------------------------      125,000. 00
       Purchase of locomotive crane (September
         1937 to March 1938)---------------               25, 000. 00
       Clearing pool area (January to July
          1938)---------------------------               510, 000. 00
       Acquisition of lands and flowage rights
         (hired labor) --------------------              627, 000. 00
                                                                         3, 077, 000. 00
   Lock and dam no. 14 (LeClaire) (by con-
     tract) :
        Continue construction of dam (continu-
          ing contract)    (July 1937 to June
          1938)                                    1, 345, 000. 00
        Installation of power, control, and light-
          ing (February to December 1938)-___         125, 000. 00
        Purchase of locomotive crane (March to
          August 1938)                                 25, 000. 00
        Alterations to existing LeClaire lock for
          use as auxiliary (December 1937 to
          March 1938                                  220, 000. 00
       Acquisition of lands and flowage rights
          (hired labor) ------------ ---              312, 000. 00
                                                                         2, 027, 000. 00
   Lock and dam no. 15 (Rock Island) (by con-
     tract) : Complete channel excavation (con-
     tinuing contract) (July 1937 to June 1938)                             466, 000. 00
   Lock and dam no. 16 (Muscatine) (by con-
     tract) :
        Construction of lockkeepers' dwellings
           (August 1937 to June 1938) ------              16, 800. 00
        Construction of esplanade (July to Sep-
          tember 1937-----------------------               4, 500. 00
        Construction of channel markers (Octo-
          ber 1937 to January 1938)  ------------        20, 000. 00
        Remedial works (July to September
           1937) ---------------------------------         6, 500. 00
       Clearing pool area (August to November
          1937) --------------------------------        165, 800. 00
       Acquisition of lands and flowage rights
          (hired labor) ____----_____________--         540, 000. 00
       Miscellaneous____---------------------------_     10, 000. 00
                                                                           763, 600. 00
   Lock and dam no. 17 (New Boston) (by con-
     tract) :
        Continue construction of dam (continuing
          contract) (July 1937 to June 1938).... 1, 913, 000. 00
        Installation of power, control, and light-
          ing (January to December, 1938) ....        125, 000. 00
       Purchase of locomotive crane (March to
          December 1938) ---------------------         25, 000. 00
       Acquisition of lands and flowage rights
          (hired labor) -------      -    -__-------_ 127, 000. 00
                                                                         2, 190, 000. 00
938        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New work-Continued.
   Lock and dam no. 18 (Burlington) (by con-
     tract) :
        Construction of lockkeepers' dwellings
          (August 1937 to June 1938)-----                $16, 800. 00
        Complete installation of power, control,
          and lighting (July to September 1937)            15, 800. 00
        Construction of esplanade (August to
          Segtember 1937)-      __-____________            14, 500. 00
        Construction of channel markers (Octo-
          ber 1937 to January 1938)_                       20, 000. 00
        Purchase of locomotive crane (July 1937)_          25, 000. 00
        Clearing pool area (August 1937 to March
          1938)                                          281, 000. 00
        Acquisition of lands and flowage rights
          (hired labor)                                  225, 000. 00
        Miscellaneous                                     10, 000. 00
                                                                          $608, 100. 00
      Lock and dam no. 20 (Canton) (by contract) :
          Construction of lockkeepers' dwellings
            (August 1937 to June 1938)-                   16, 800. 00
          Construction of esplanade (July to Sep-
            tember 1937)__--         _____                  4, 000. 00
          Construction of channel markers (Octo-
             ber 1937 to January 1938)-                   20, 000. 00
          Miscellaneous--          --                     10, 000. 00
                                                                             50, 800. 00
      Lock and dam no. 21 (Quincy) (by contract) :
          Complete construction of dam (continu-
            ing contract) (July 1937 to January
            1938)                               _-_- 1, 156, 000. 00
          Complete installation of power, control,
            and lighting (July 1937 to March 1938)_     115, 500. 00
          Purchase of locomotive crane (September
            1937 to March 1938) _-                       25, 000. 00
          Clearing pool area (January to June
            1938) --       -   ----                      70, 000. 00
         Acquisition of lands and flowage rights
            (hired labor)-      -        ---            304, 000. 00
                                                                         1, 670, 500. 00
      Lock and dam no. 22 (Saverton)           (by
        contract) :
          Complete construction of dam (continu-
            ing contract) (July 1937 to March
            1938)-..-                                  1, 380, 000. 00
          Complete installation of power, control,
            and lighting (July 1937 to May 1938)__       113, 400. 00
          Purchase of locomotive crane (Septem-
            ber 1937 to March 1938)_                      25, 000. 00
          Clearing pool area (January to June
            1938)                                         70, 000. 00
          Acquisition of lands and flowage rights
            (hired labor)     __  --                     176, 000. 00
                                                                         1, 764, 400. 00
   Lock and dam no. 24 (Clarksville)       (by
     contract) :
       Complete construction of lock (July to
         November 1937)_____                             850, 000. 00
       Construction of dam (December 1937
         to February 1940)                            3, 660, 000. 00
       Acquisition of lands and flowage rights
         (hired labor) --                                 50, 000. 00
                                                                         4, 560, 000. 00
   Lock and dam no. 25 (Cap Au Gris)            (by
        contract) :
          Complete earth dike, sections 1, 2, and 4
            (July 1937 to January 1938) ---------        130, 000. 00
            RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                      939
New work-Continued.
   Lock and dam no. 25, etc.--Continued.
       Construction of dam (continuing con-
         tract) (July 1937 to June 1938)__--      $2, 713, 000. 00
       Clearing pool area (July to October
         1937)---------------------------              22, 000. 00
       Acquisition of lands and flowage rights
          (hired labor) (July 1937 to June 1938)_     180,000.00
                                                                                 $3, 045, 000. 00
     Lock and dam no. 26 (Alton) (by contract) :
         Government costs on lock, including ad-
           ditional change orders (July 1937 to
       February 1938) --------------------------                  90, 000. 00
         Government costs on dam, including ad-
           ditional change orders (July 1937 to
           February 1938) ________                               105, 000. 00
         Installation of power, control, and light-
           ing (July 1937 to April 1938)        --               175, 000. 00
         Landscaping (March 1838 to July 1938)__                  50, 000. 00
         Purchase of locomotive crane (Septem-
           ber 1937) -----------------------                      32, 000. 00
         Purchase of bulkhead pick-up and serv-
           ice bridge and storage yard trucks
            (July 1937 to October 1937)-                          19, 000. 00
         Clearing pool area (November 1937 to
           June 1938) -----------------                          800, 000. 00
         Acquisition of lands and flowage rights
           (hired labor) (July 1937 to June 1938)_             1, 500, 000. 00
                                                                                  2, 771, 000. 00
     Maple Island (by contract) : Solid dikes
       (August 1937 to June 1938)---------------                                     90, 000. 00
     General:
         Dredging by hired labor in pools 10 to 24
           inclusive, to obtain project depth and
           alinement (Rock Island district) (July
           1937 to June 1938) -------------------                210, 000. 00
         Purchase of miter-gate machine spare
           parts and set of Poiree trestles (Rock
           Island district) ---------------------                 30, 000. 00
         Hydraulic data and studies, surveys,
           engineering, and designs (Rock Island
           district) ---------------------------                260, 000. 00
         Purchase of spare motors and parts (St.
           Paul district)           (July to September
           1937) ---------------------------                      12, 000. 00
         Miscellaneous surveys (hired labor) St.
           Paul district) -----------------------                 11, 000. 00
                                                                                   523, 000. 00
            Total new work_____ _____________--                      -______   36, 894, 800. 00
Maintenance (July 1937 to June 1938) :
    Channel maintenance dredging                      ------------------        1, 097, 500. 00
    Maintenance of existing regulating works-----------------                      108, 000. 00
    Surveys, gages, studies, and aids to navigation-----_______                    112, 000. 00
    Snagging --------------------------------------------                           20, 000. 00
      Total maintenance- ........          ___         ____-   -   -        -__ 1, 337, 500.00
Maintenance (operating and care) (July 1937 to June 1938) :
   Operations     ------------------------------------------             _     500, 000. 00
   Ordinary repairs------------------------------------                          71, 000. 00
    Improvement and reconstruction- ------              -      __------------- 56, 000. 00
   Emergencies----------------------------------                     --------     5, 000. 00
      Total operating and care                          __-__- _---__-------..__
                                                                         _      632, 000. 00
Unallocated balance            .--------                             --           9, 248. 51
       Total regular funds_________________________________                      40,494, 966.83
940         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Public Works funds.-The balance unexpended, including accounts
receivable at the end of the year, will be applied as follows:
Accounts payable, June 30, 1937___---------------------------                      $313,164.36
Lock and dam no. 26 (Alton) (by contract) :
    Complete construction of locks (July 1937 to
      February 1938) ------------------------ $576, 000.00
    Complete construction of dam (July 1937 to
      February 1938) --    ----------------------- 619, 500.00
                                                                                 1,195, 500.00
General (Rock Island district) :
   Liquidated damages protested--------------                       8, 415.39
   Contingencies ----------------------------                      12, 947.91
                                                                                     21, 363. 30
      Unallocated balance --------------------------------------                          90. 66

        Total Public Works funds---------------------------1,                       530, 118. 32
  Emergency Relief funds.-The balance unexpended, including ac-
counts receivable at the end of the year, less revocation of $75,000
made in July 1937, will be applied as follows:
Accounts payable, June 30, 1937___-_                                               $163, 130. 48
Payment of final Government costs under contracts for con-
  struction of dams nos. 7 and 8 (St. Paul district) __                               4, 490. 09
  "Liquidated
General (Rock Island district)
                damages protested________----------
    Contingencies ------------------------------
                                                     $2, 400. 00
                                                      8,921. 41
                                                                                     11, 321.41
      Total Emergency Relief funds-------------------------                         178, 941.98
Total for all work--    .------------                                           42, 204, 027. 13
  The additional sum of $13,703,000 can be profitably expended dur-
ing the fiscal year 1939 as follows:
New work :
   Lock and dam no. 2 (Hastings): New lock approaches--...                             $350,000
   Lock and dam no. 3 (Red Wing) :
       Lockkeepers' dwellings_     ____      __-______-$21, 000
       Esplanade and landscaping ________________        24,000
       Remedial dike-------------------------------      40,000
       Road surfacing (access road, Minnesota side)_     10, 000
       Land and flowage acquisition_------------__  -   260,000
                                                                                       355, 000
    Lock and dam no. 5A (Winona) : Clearing pool area
    Lock and dam no. 6 (Tremplealeau) : Clearing pool area----.
                                                                     -----.             18,000
                                                                                        32, 000,
    Lock and dam no. 7 (La Crosse) :
        Lockkeepers' dwellings ____________________       $21, 000
        Esplanade and landscaping ______-___-        - __  23, 000
        Footbridge ---------------------------------       12,000
                                                                                        56,000
    Lock and dam no. 8 (Genoa) :
        Underpass                                                        12, 000
        Land and flowage acquisition_____                  _______      240, 000
                                                                                       252, 000
    Lock and dam no. 9 (Lynxville) :
        Lockkeepers' dwellings_      _____--          -________ 21, 000
        Esplanade and landscaping ____-__- -         _____       39,000
        Land and flowage acquisition----------------            350, 000
                                                                                       410. 000
    Lock and dam no. 10 (Guttenberg) : Miscellaneous________                            10, 000
    Lock and dam no. 11 (Dubuque) : Miscellaneous____________                           10, 000
           RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                           941
New work-Continued.
   Lock and dam no. 12 (Bellevue)':
       Lockkeepers' dwellings, etc- -     _____--$40,                            000
       Channel markers -----------------------------                         20, 000
       Clearing pool area _______-______-___- __                            200, 000
       Miscellaneous ---------------------------------                       10, 000
                                                                                          $270, 000
    Lock and dam no. 13 (Clinton) :
        Lockkeepers' dwellings, etc__--- --.....                             40,   000
        Channel markers___                                                   20,   000
        Clearing pool area_                                                 415,   000
        Miscellaneous                                                        10,   000
                                                                                           485, 000
    Lock and dam no. 14 (LeClaire) :
        Complete construction of dam (continuing
          contract) ___200,                                                      000
        Channel markers---______-------____________
                                              -20,                               000
        Lock grounds---------------------------------                        10, 000
        Clearing pool area _______________---___-----                       125, 000
        Land and flowage acquisition-...--......      .                     175, 000
    Miscellaneous ------------------------------                             10, 000
                                                                                            540, 000
   Lock and dam no. 15 (Rock Island) : Storage house___ __..                                  15, 000
   Lock and dam no. 16 (Muscatine) : Miscellaneous                               -______. 10, 000
   Lock and dam no. 17 (New Boston) :
       Complete construction of dam (continuing con-
         tract) ---------------------------------     __           ----     215, 000
       Lockkeepers' dwellings, etc--------------------__                     40,000
       Channel markers ----------   _-___ _-- ---             ----           20, 000
       Clearing pool area-___- ________--_--____                            210, 000
                        ...
       Miscellaneous_-----                                                   10, 000
                                                                                            495, 000
   Lock and dam no. 18 (Burlington) : Miscellaneous                                           10, 000
   Lock and dam no. 19 (Keokuk) :
       Auxiliary lock_________- _____________                          _ 2, 825, 000
       Power, control, and lighting_                                        150, 000
       Dry dock---------- --------------------------                        500, 000
       Channel markers___--------------------                                20, 000
       Clearing pool area ______----------35,                                    000
       Miscellaneous------------------------__                               10, 000
                                                                                         3, 540, 000
   Lock and dam no. 20 (Canton) : Miscellaneous ..............                                10, 000
   Lock and dam no. 21 (Quincy) :
       Lockkeepers' dwellings, etc                    ----
                                                 __------                    50, 000
       Channel markers_-_                 __--------------------             20, 000
       Clearing pool area--
       Miscellaneous- -------------------------------
                                                                        -    60, 000
                                                                             6-------------------
                                                                             10, 000
                                                                                            140, 000
   Lock and dam no. 22 (Saverton) :
       Lockkeepers' dwellings, etc--                       --
                                                        ______-__-           40, 000
       Channel markers --               --                                   20, 000
       Clearing pool area .............                                      60, 000
       Miscellaneous --------------------------------                        10, 000
                                                                                            130, 000
   Lock and dam no. 24 (Clarksville), (Rock Island
         district) :
       Channel markers--------------------------                             20, 000
       Clearing pool area___---------------------                           360, 000
       Land and flowage acquisition ____-----------                         400, 000
                                                                                            780, 000
   Lockand dam no. 24 (Clarksville)                     (St. Louis
         district) :
       Power, control, and lighting-- ------                                150, 000
       Lockkeepers' dwellings --------------------                           22, 000
       Landscaping -------------------------------                           25, 000
                                                                                            197,000
942       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New work-Continued.
   Lock and dam no. 25 (Cap Au Gris) :
       Completion of dam (continuing contract) ....
                                                  -   $1,148,000
       Power, control, and lighting _________---__-      150, 000
       Lockkeepers' dwellings -----------            -    24, 000
       Landscaping ---------------------------------      25, 000
       Land and flowage acquisition and clearing___      575, 000
                                                                                $1, 922, 000
    General:
       Rectification of damages to drainage and levee
          districts (Rock Island and St. Louis dis-
          tricts) -------------------------------------              735, 000
       Dredging in pools 10 to 24, inclusive, for project
          depth and channel alinement (Rock Island
          district) ---------------------------                      890, 000
       Miscellaneous designs and finished structure
          drawings (St. Paul district) -----------------             100, 000
                                                                                 1, 725, 000

            Total new work .........-                                           11, 762, 000

Maintenance :
   Channel maintenance dredging--------------------------                        1,014, 000
   Maintenance of existing regulating works--------------------                     80, 000
   Removal of dikes adjacent to locks ---------------------------                   10, 000
   Surveys, gages, and studies ___________________________        -                 93, 000
   Snagging __--------------------------------------------------                   18, 000
      Total maintenance -- ___-----------------------------------                1,215, 000

Maintenance (operating and care) :
                -'Olperations__--------_                                           550,000
    Ordinary repairs---------------------------------------------                  107, 000
    Improvement and reconstruction------------------------------                    42, 000
    Emergencies------------ -------------------------------------                  27, 000

      Total operating and care ----------------------------------                  726, 000
      Total for all work-------------------------------------                   13, 703, 000
  It is expected that the proposed expenditures will complete the
project, except for further expenditures required on rectification of
damages to drainage and levee districts, and extension of the project
over St. Anthony Falls authorized in the 1937 River and Harbor
Act subject to final approval by the Board of Engineers for Rivers
and Harbors.
                                Cost and financial summary

                        MAINTENANCE        AND IMPROVEMENT   FUNDS

Cost of new work to June 30, 1937 ------------------------             1 $76, 262, 241. 88
                                                                       12
Cost of maintenance to June 30, 1937 __--_______________--               318, 988, 155. 01
      Total cost of permanent work to June 30, 1937---...                  95, 250, 396. 89
Undistributed costs June 30, 1937_                                               7, 148. 26
      Net total cost to June 30, 1937 _______________________              95, 257, 545. 15
Plus accounts receivable June 30, 1937---------------------                     51, 092. 07
      Gross total costs to June 30, 1937_____________________              95, 308, 637. 22
Minus accounts payable June 30, 1937-        -
                                           __________________               1, 621, 418. 32
       Net total expenditures .______-_______--__                    23 93, 687, 218. 90
  1Amount of $21,691.95 transferred from maintenance to new work in fiscal year 1937.
  2Exclusive of $40,000 expended from contributed funds.
  SIncludes $5,863,584.26 for operating and care of works of improvement and operating
snagboats under the permanent indefinite appropriation.
                  RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                                                         943
Unexpended balance June 30, 1937____
                                --------------                                                 --                    $11, 894, 874. 76

           Total amount appropriated to June 30, 1937 ____-__-__23 105, 582, 093. 66

    Fiscal year ending June 30                              1933             1934              1935             1936              1937


Cost of new work ... _---------- $4, 916, 248. 31 $3, 504, 329. 97                         $169,346. 40      $184, 312. 74 $13,836,837. 59
Cost of maintenance------------ 1, 648, 29. 38 1, 851, 889. 74                            1, 182, 937. 53   1,267, 634. 42   1, 495, 992. 71

       Total cost_-------------                       6, 564, 537.69    5, 356, 219. 71   1, 52, 283. 93    1,451, 947.16     15, 332, 830.30

Total expended---.......--....-----.......            6, 399, 254. 63   5,494,899. 84     -137,340. 37      1, 280, 802.66    14, 015, 346.58

Allotted     _._.------------------                   9, 344, 013. 71   2, 862, 132. 90   -197,599. 69 25, 474,182. 75          -22, 000.00


Balance unexpended July 1, 1936_______       __        __      $25, 932, 221.34
Deductions on account of revocation of allotment--------------       22, 000. 00

      Net amount to be accounted for------------         ----                                                          25, 910, 221.34
Gross amount expended-___         -___-_________ _ $14, 268, 314.95
Less-
    Reimbursements collected.....---- $252, 753. 87
    Receipts from sales-----------          214. 50
                                                        252, 968. 37
                                                                                                                       14, 015, 346. 58

      Balance unexpended June 30, 1937---------------------- 11, 894, 874.76
Outstanding liabilities June 30, 1937                   265.00
                                               $------------2,998,
Amount covered by uncompleted contracts...__-   5, 217, 952. 09
                                                                8, 216, 217. 09

      Balance available June 30, 1937______________________                                                             3, 678, 657.67
Accounts receivable June 30, 1937-------------------------                                                                  51, 092. 07
     Unobligated balance available June 30, 1937-------------                                                            3, 729, 749. 74
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------__-__---_                                                                            28, 549, 000. 00
           Balance available for fiscal year 1938-----------------                                                     32, 278, 749. 74
Amount (estimated) required to be appropriated for completion
                     - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - -
of existing project                                                                              13, 458, 500. O00
Amount that; can be profitably expended in fiscal year ending
June 30, 1939: 4 - - - -
                          - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - -
   For new work                                                                                    11, 762, 000. 00
   For maintenance   4
        Formaitennce---------------------------------------19,00.0                                  1, 941, 000. 00
                        4
           Total                      -------------------                                                              13, 703, 000.00


                                                             PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937                                                                                         686, 258. 37
                                                                                                                       $-----------------------
Cost of maintenance to June 30, 1937_________

      Total cost of permanent work to June 30, 1937-----------    50, 686, 258. 37
Minus accounts payable June 30, 1937--  ___-_____-     _---------     313, 164. 36
     Net total expenditures           __    ___-___-
                                         __-------------__                                                              50, 373, 094.01
Unexpended balance June 30, 1937 _____________----------                                                                 I, 530, 118.32
            Total amount appropriated to June 30, 1937_----------                                                       51, 903, 212. 33
    2 Exclusive   of $40,000 expended from contributed funds.
   SIncludes $5,863,584.26 for operating and care of works of improvement and operating
snavboats under the permanent indefinite appropriation.
   4 Exclusive of available funds.
   5 Exclusive of extension above St. Anthony Falls.
            20196--37-pt. 1-60
944                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


Fiscal year ending June 30                    1933                   1934                    1935                  1936               1937


Cost of new work...-------                                       $10, 074, 952.92
                                                      ...------------                 $25, 115, 729. 77       $11, 413, 467.31    $4, 082, 108.37
Cost of maintenance....-------------------------
Total expended-------------..............     ---------           7, 683, 292. 59         26, 052, 764.51      11,934, 054. 02     4, 702, 982.89
Allotted-.----.------------                   .-----------33, 582, 619. 53                18, 445, 000.00        -28,497. 34         -95,909.86


Balance unexpended July 1, 1936 ---                    ___    $6, 329, 011.07
Amount allotted from Emergency Appropriation Act approved
  June 19, 1934----------------------------------------------     315, 000. 00
     Amount to be accounted for----------------------------                                                                    6, 644, 011. 07
Deductions on account of revocation of allotment_                                                                                 410, 909. 86
      Net amount to be accounted for __________                                                                                6, 233, 101. 21
Gross amount expended-----------------------     $5, 116, 785. 16
Less-
    Reimbursements collected---- $413, 725. 27
    Receipts from sales-----------        77. 00
                                                     413, 802. 27
                                                                                                                               4, 702, 982. 89
      Balance unexpended June 30, 1937____                                                                                     1, 530, 118. 32
Outstanding liabilities June 30, 1937_________                                                         $22, 566. 48
Amount covered by uncompleted contracts------                                                       1, 507, 551.84
                                                                                                                               1, 530,118. 32
                                                      EMERGENOY           RELIEF FUNDS

Cost of new work to June 30, 1937 _____-                                                                          _ $22, 842, 889. 06
                                                                                                         -__-________
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937_ ----                                                                    22, 842, 889. 06
Minus accounts payable June 30, 1937-----------------------__                                                                    163, 130. 48

     Net total expenditures_                        -                                                                        22, 679, 758. 58
Unexpended balance June 30, 1937 --------------------------                                                                      253, 941.98

            Total amount appropriated to June 30, 1937------                                                                 22, 933, 700 .56


    Fiscal year ending June 30                         1933             1934                 1935                1936                1937


Cost of newwork           -----------------
                                     .....      .......--------             ------
                                                                        ..------           $19, 302.23      $11, 748,659. 49     $11, 074,927. 34
Cost of maintenance-----------                  ------------                   ---------             --- ------------------------------
Total expended----------...........--             -           -------------- ______------------_             9,850,636.85         12, 829,121.73

Allotted---------------------------                                ------------ 25,000,000. 00              -2,040,)000.00           -26, 299.44


Balance unexpended July 1, 1936___                                             --------                                  $13, 109, 363. 15
Deductions on account of revocation of allotment---------                                                                          26, 299. 44

      Net amount to be accounted for______________ -----          _                                                          13, 083, 063. 71
Gross amount expended__--------------------       $12, 972, 382. 98
Less-
    Reimbursements collected-...    $143, 119. 30
     Receipts from sales-----------       141. 95
                                                       143, 261. 25
                                                                                                                             12, 829, 121. 73

            Balance unexpended June 30, 1937---------------------                                                                253, 941. 98
                     RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                                                       945
Outstanding liabilities June 30, 1937 -------                                                $31, 430. 24
Amount covered by uncompleted contracts------                                                147, 511. 74
                                                                                                                       $178, 941. 98

             Balance available June 30, 1937-------------------------                                                       75, 000. 00
   1 Revoked in July 1937.

CONSOLIDATED                   COST     AND     FINANCIAL SUMMARY FOR                      MISSISSIPPI            RIVER,     MISSOURI
                                                    RIVER TO MINNEAPOLIS

Cost of new work to June 30, 1937_---_____--------------                                                      1 $149, 791, 389. 31
Cost of maintenance to June 30, 1937- .------------------                                                        318, 988, 155. 01

      Total cost of permanent work to June 30, 1937______                                                          168, 779, 544. 32
Undistributed costs June 30, 1937_--------------------                                                                    7, 148. 26

      Net total cost to June 30, 1937___---------                                                                  168, 786, 692. 58
Plus accounts receivable June 30, 1937 __-___-                                       --- __--         _                  51, 092. 07

                                       ------------
      Gross total costs to June 30, 1937                                                                  ----     168, 837, 784. 65
Minus accounts payable June 30, 1937 _____---_                                                                       2, 097, 713. 16

     Net total expenditures________-_________                                              _______            2 3166, 740, 071. 49
Unexpended balance June 30, 1937      ______                                                                        13, 678, 935. 06
             Total amount appropriated to June 30, 1937_________                                                 23180, 419, 006. 55


   Fiscal year ending                       1933                1934                1935                  1936                 1937
         June 30


Cost of new work-    .---- $4, 916, 248. 31               $13, 579, 282. 89   $25, 304, 378. 40   $23,346,439.54           $28,993,873.30
Cost of maintenance_        1, 648, 289. 38                 1, 851, 889.74      1, 182, 937. 53     1, 267, 634. 42          1, 495, 992. 71

         Total cost......               6, 564, 537. 69    15, 431, 172.63     26, 487, 315..93    24, 614, 073. 96        30, 489, 866. 01
Total expended----.......               6, 399, 254. 63    13,178, 192. 43     25,915, 424.14      23, 065, 493. 53         31, 547, 451. 20
Allotted--------------...............   9, 344, 013. 71    36, 444, 752. 43    43, 247, 400. 31    23, 405, 685.41           -144, 209. 30



Balance unexpended July 1, 1936 ._______________________. $45, 370, 595. 56
Amount allotted from Emergency Appropriation Act approved
June 19, 1934_    ____-___ _-______-315,                           000. 00
     Amount to be accounted for__ _________-____-__-- -                                                   -         45, 685, 595. 56
Deductions on account of revocation of allotment --------                                                            - 459, 209. 30
      Net amount to be accounted for- ___..____---       __---                                                      45, 226, 386. 26
Gross amount expended---_----___-----___   __    $32,357,483. 09
Less-
    Reimbursements collected--- $809, 598.44
    Receipts from sales-_- ___     _     433. 45
                                                      810, 031. 89
                                                                                                                    31, 547, 451.20

      Balance unexpended June 30, 1937___-_________-----__                                                          13, 678, 935. 06
Outstanding liabilities June 30, 1937___________ $3, 052, 261. 72
Amount covered by uncompleted contracts-----      6, 873, 015. 67
                                                                                                                      9,925,277. 39
     Balance available June 30, 1937_______________-------------                                                      3, 753, 657. 67
Accounts receivable June 30, 1937___________--------------------____                                                      51, 092. 07
              Unobligated balance available June 30, 1937__----------                                                 3, 804, 749. 74
    1 Amount of $21,691.95 transferred from maintenance to new work in fiscal year 1937.
  2 Exclusive of $40,000 expended from contributed funds.
  8 Includes $5,863,584.26 for operating and care of works of improvement and operating
snagboats under the permanent indefinite appropriation.
946          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----   --------------------------                                  $28, 549, 000. 00

        Balance available for fiscal year 1938----------------                             32, 353, 749. 74

Amount (estimated) required to be appropriated for completion
   of existing project 4 6--------------                                                    13, 458, 500. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:   - - - - - - - - --      - - - - - - - - - - - - - - - - - - - - - - --
   For new work                                                                            11, 762, 000. 00
                       -- -      -- ----- --- ---- -- - -- --- ----- -- ---
   For maintenance 4        ----                                                            1, 941, 000. 00
                  - - - - - --   - - -- - -- - -- - -- - - -- - -- - -- - - -- -- ---- -
         Total                                                                             13, 703, 000. 00
  4Exclusive of available funds.
  5Includes $75,000 E. R. A funds          revoked July, 1937.
  6 Exclusive of extension above        St. Anthony Falls.


IMPROVEMENT OF RIVERS AND HARBORS IN THE ROCK
            ISLAND, ILL., DISTRICT
  The Rock Island district comprises the watershed of the Mississippi
River from Clarksville, Mo., to the mouth of the Wisconsin River, a
distance of 358 miles. Locks and dams have been completed or are
under construction at Saverton, Quincy, Canton, Keokuk, Burling-
ton, New Boston, Muscatine, Rock Island, Le Claire, Clinton, Belle-
vue, Dubuque, and Guttenberg. The Illinois and Mississippi Canal
is also included.
  District engineer: Lt. Col. R. A. Wheeler, Corps of Engineers, to
August 12, 1936, and Lt. Col. E. E. Gesler, Corps of Engineers, since
that date.
  Division ,engineer: Col. J. N. Hodges, Corps of Engineers.
                                             IMPROVEMENTS

                                               Page                                                    Page
1. Mississippi River bet ween                           4. Examinations, surveys, and
      Clarksville, Mo., and the                              contingencies (general) - - -             953
      Wisconsin River --------     916                  5. Plant allotment---------_      ---          954
2. Illinois and Mississippi Ca-                         6. Upper Mississippi River Val-
      nal, Ill------------------ 946                         ley flood control ----------              954
3. Mill Creek and South Slough                          7. Rock River Basin, Ill. and
      at Milan, Ill_-------------951                         Wis., flood control--------
                                                                                     ...               956
  1. For report on this improvement see                  pages 916 to 946.

                     2. ILLINOIS AND MISSISSIPPI CANAL, ILL.

   Location.--This canal connects the Illinois and Mississippi Rivers,
proceeding from a point on the Illinois River about 12 miles from
La Salle, across the State of Illinois to the Mississippi River at the
mouth of Rock River.
   Existing project.-This provides for the construction of a canal
from the Illinois River, near Bureau Junction, running westerly via
the Bureau Creek Valley to Rock River, near Colona, thence in the
bed of Rock River to the rapids near Milan, Ill., and thence to the
Mississippi River at the mouth of Rock River, at Rock Island, the
length of the main line being 75 miles. The feeder, 29.3 miles in
length, extends from Rock Falls on Rock River, to the summit level
of the canal, about 28 miles from the Illinois River.
       RIVERS AND HARBORS-ROCK ISLAND, ILL., DISTRICT            947
   There are 32 locks in the main canal, described in the following
tabulation. There is also a lock and controlling works at the head
of the feeder at Rock Falls, and a lock in Rock River at Rock Falls
connecting the pool of the Government dam with the power com-
pany's dam below. This lock has dimensions similar to those in the
main canal and cost $75,000.
   The estimate of cost for new work, revised in 1902 (H. Doc. No.
297, 57th Cong., 1st sess.), was $8,911,551.12. The estimated cost of
operation and maintenance, made in 1936, is $176,000 annually.
   The existing project was adopted by the River and Harbor Act
of September 19, 1890 (H. Doc. No. 316, 51st Cong., 1st sess.). Oper-
ation and care of the canal and appurtenances were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
   The latest published map is shown on page 2013 of Annual Report
for 1908.
   The River and Harbor Act of July 3, 1930, provided for the pay-
ment of $8,450.75 to the Mud Creek special drainage district for
work accomplished by the said district in reducing the maintenance
cost of the canal to the United States (H. Doc. No. 108, 70th Cong.,
1st sess.). The act also authorized the Secretary of War to expend
from funds appropriated and available for maintenance and im-
provement of existing river and harbor works the sum of $25,235 as
a contribution toward the relocation and reconstruction of the high-
way bridge across the Illinois and Mississippi Canal at Wyanet,
Bureau County, Ill., known as Bridge No. 10: Provided, That the
highway authorities of Bureau County, Ill., furnish assurances satis-
factory to the Secretary of War that they will reconstruct and main-
tain said bridge without further cost to the United States.
                                                          Table showing features of the Illinois and Mississippi Canal
                                                                                                          LOCKS

                                                   Location                                                            Locks


                                                                                                         Dimensions            Depth on miter
                                                                                                                                    sill                                                                                0b
                       Dis-
       Name           tance                                                                                                                       Character of foundation            Year opened         Totalcost
                       from          Distance from nearest town or mouth of                             Great-                                                                      to navigation
                      Missis-                  navigable tributary                               Width leth                                                                                                             H

                       sippi                                                                       of   length
                       River                                                                     chofn- avail-         Lift    Upper   Lower
                                                                                                   ber                                                                                                                  0

                                                                                                        able for
                                                                                                          full
                                                                                                         be
                                                                                                        width
                                                                                                                                                                                                                        0


                       Miles                                                                         Feet     Feet     Feet    Feet     Feet
Lock no. 1......       74. 87   Illinois River, 2,000 feet west---..--.---------                        35   143.08      9.0    8.17      7.0    Sand and clay...---       ..-------
                                                                                                                                                                                  Oct. 24,1907        $41, 305.03
Lock no. 2........... 73.91     At Bureau Junction.............................                         35   143.08      9. O0 8.17       7.0    Sand, clay, and gravel-........ do........            42, 099.69
Lock no. 3_...------   73.29     2 mile west of Bureau Junction--__                                    35    143.08      9.0    8.17      7.0    Quicksand and gravel-- ... .... do....----            39, 172.01
Lock no. 4 -........ 71. 75     2% miles west of Bureau Junction-             -..-    .....            35    143. 08     9.0    8.17      7.0    Sand and gravel----------.... ... do..-----           39, 357. 10
                                                                                                                                                                                                                        CI'
Lock no. 5-.....----   70. 63   3% miles west of Bureau Junction_                       _-             35    143.08      8.0    8.17      7.0   _.__ do.            ...            .. do.-------------------do
                                                                                                                                                                                             --        39, 509.45
Lock no. 6 .-------    68. 75   5 miles west of Bureau Junction_...___...---                      .    35    143.08     10. 0   8.17      7.0    Sand, hardpan, and gravel- .... do....----            41, 927. 72
Lock no. 7 ___----...  68. 00   3 miles east of Tiskilwa-....----................                      35    143.08      8.0    8.17      7.0    Loam and sand...----------.._.       do.....---       35, 635.09
Lock no. 8___...------ 67. 02   2 miles east of Tiskilwa...---.---------- . ---                        35    149. 75     8.0    8.17      7.0   ....do-....--------------          .. do.....----      36, 274. 37
Lock no. 9___----____  66.80    13 miles east of Tiskilwa_..................                           35    149. 75     8.0    8.17      7.0    Clay.....----------------..-----do.....-              32,134.93
Lock no. 10_-...-----  64. 98   At Tiskilwa................................                            35    149. 75     9.0    8.17      7.0    Sand and gravel____... __...__ do.......__            36,113. 71
Lock no. 11....___-    64. 13   1 mile west of Tiskilwa...__                  __ ___................   35    149. 75     9.0    8.17      7.0   ---.....-        ---
                                                                                                                                                     do..------------...... do....                        36, 710. 05
Lock no. 12-......---  63.56    1% miles west of Tiskilwa ... __.______. . ___                         35    149. 75     8.0    8.17      7.0      do.....
                                                                                                                                                ....                            do....-------------...-----do           Co
                                                                                                                                                                                                 33, 827. 14
Lock no. 13___- __--   62. 83   3 miles west of Tiskilwa.......................                        35    149. 75    10. 0   8.17     7.0    Loam and clay-----.-.......... do......--        32, 294. 88
Lock no. 14....____    62.02    3 miles east of Wyanet...........__ ........                           35    149. 75    10.0   8.17      7.0    Sand and gravel....       ..... do_........ 31, 524.90
Lock no. 15-......---  61.42    2/4 miles east of Wyanet....                    __..............       35    149. 75    10.0   8.17      7.0    - _..do..              ..            ..---------------
                                                                                                                                                                                           do........     29, 974. 01
Lock no. 16-.........  61.23    2 miles east of Wyanet...__________.               ___.__       .      35    149. 75    11.0   8.17      8.0     Loam, clay, and sand-.......             do_........     34, 089. 19
Lock no. 17_..-__ -    60.98    1% miles east of Wyanet.-                           -                  35    149. 75    10. 0  8.17      7.0     Sand and gravel_---.....____          . do......__       32, 576. 27
Lock no. 18_______     59.90    1 mile east of Wyanet...-______              _______-____              35    149.75      9.0   8.17      7.0     Clay and gravel....-----------..do...._--                35, 372. 69
Lock no. 19-.......    59. 12   At Wyanet...............................                               35    149. 75    10. 0  8.17      7.0     Sand and gravel....------------..do........              34, 239. 36
Lock no. 20.......... 58. 09    1 mile west of W yanet..........................                       35    149. 75    11.0   8.17      7.0     Loam, clay, and sand- ........ do-........               36, 838. 76
Lock no. 21....._____  57. 83   1% miles west of Wyanet._-.-----___-                         .
                                                                                            __-__.     35    149. 75    11.0   8.17      8.0    ---....
                                                                                                                                                      do......----------..do....... 38, 026. 88
Guard lock- ... __     29. 20   29 miles north main-line canal 3 ....                                  35    149.00     (1)     8.30     6. 5    Limestone-...............            . do-....-.         32, 678. 57   W
Rock River Lock 2._ 29. 20      At Rock Falls, 111.3.............................                      35    143.08     (1)     8.47     6.6    -..--.do....-------------------do........                 75,605.01
Lock no. 22-.........  46. 32   13 miles west of Wyanet.........                                       35    143.08      9.0    8.17      7.0    Clay          ...               ..----------------.-----
                                                                                                                                                                                         do.......        42, 458. 63
Lock no. 23-.....__..  37. 12   10 miles east of Geneseo.........................                      35    143. 08    11.0    8.17      7.0   .....               --
                                                                                                                                                      do.......-------                   do........41, 777. 95
Lock no. 24.......... 27. 05    At Geneseo...           .........................                      35    143. 08    11.0    8.17     7.0     Clay and gravel-----------.......       do........       47, 059. 15
Lock no. 25.......... 21. 56    5% miles west of Geneseo.....................                          35    143.08      8.0    8.17      7.0    Sand-....--------------.----do........                   40, 492. 10
Lock no. 26.........   20. 46   5 miles east of Colona ...................                .......      35    143. 08     9.0    8.17     7.0    ..... do---....-.--.-----------do-.......                 40, 428. 75
Lock no. 27.......... 18.13     2V2miles east of Coloa------------......................--...          35    143. 08     8.0    8.17     7.0     Gravel................... ..... do.......                39, 090. 66
Lock     no.   28___               15.70           At Colona............-------------...........-------------------................         35       143. 08           8. 0         8. 17           7. 0 Rock---...--........--------------...........do......30, 808. 53
Lock     no.   29- ------ 13.37                    23 miles west of Colona.....................---------------------                        35       143. 08          11. 0         8. 17           7. 0 ..... do -------------- - -.......-do-......          37, 262. 65
Lock     no.   30.---------         4.62           1 miles east of Milan --.....----------                                       ...        35       149.00            0            7.00            7.0 Rock, etc., hardpan ----....... _      do. .....       71, 588.00
Lock     no.   31----------.........2. 02          1 mile west of Milan ..........................                                          35       145. 42           6. 0         7. 17           7. 0 Clay and gravel------------.............do-.......    38, 711. 44
Lock     no.   32 ..........          .15          34 miles west of Milan---...........----....--.......----- --------                      35       143.08           12. 0         8. 00           7. 0       do--         ---               do85,                468. 31
         Total cost of
          locks                                                                                                            ----------------------------                                                                                            ...-----------------------------------------
                                                                                                                                                                                                           ----------------- ------------------------   1, 382, 432. 98

                                                                                                                                Additionalfeatures entering into cost of project
Sterling Dam and dams at Milan, Ill ....---------------------------------------------------------------------------------------------------                                                                                                                                                       $128, 857.97
Bridges                                                                                                                                                                                                                                  ------------------------------------ 1,-----------        513, 823
                                                                                                                                                                                                                                                                                                 , 513,  823.25------------------------
Culverts.........................................................................................-------------------------------------------------------                            ----------------------------------------------------------------------                                  ....   410,19
                                                                                                                                                                                                                                                                                                   410,198.19
Houses-------
HoSurveys,    f.................owage,
                                and right-of-way       ----------------------------------------------------------------------------------------------------------------------------------
                                         right-of-way----------------------------------------------------------------------------------...........................................................-----------------------------------------------........................                           76,974:69
                                                                                                                                                                                                                                                                                                     76,656974.69
Surveys,      flowage,          and                                   __...              . ... .. .......................................................                                                          .. ... ... ....             .. .........             .................... ..    726,  656.61
Excavation, embankments, clearing, fences, etc--..------                                                  __----------------------------------------------------------................................................................ ...........................------------------------- 2, 956,  , 451. 61
Rock River pool-Dredging, removing snags and stumps, etc______-----                                                                               __...................................................                            ...       ..            ...         ...................         1 439. 52,58
Contribution to Mud Creek special drainage district-dredging ...----------------------------                                                                                                         --------------------------------------------------------                                         8, 450.75
Contribution to State of Illinois-Relocation and reconstruction of highway bridge at Wyanet, Ill....-___                                                                                   _____________________________                                 ......      _______         ...            25, 235.00
Miscellaneous---------                                    --------------------------------------------  ------                 --- ------------- -----------                                                    ------------------------------------------------- 223,622.78                                         O
         Total additional features.........................                                                                                                                          6, 222, 710. 43
                                                                                                             .................-----------------------------------------------------------------------------
         Total cost of project-------------........................................................
                                                                          ------...--...................................                                                   605,
                                                                                                                                                                        7,605,143.41------------------------------
    1 Variable.                                                                                                                                                                               O
    2Rock River lock is on Rock River at Rock Falls, Ill. It is located in the south end of the Sterling Dam and about 600 feet below the guard lock of the Illinois and Mississippi
Canal (feeder section).
    3 Feeder section.
    NoTE.-There are no dams except at the guard lock and lock 30. At the former locality there is a fixed dam across the Rock River, with a movable crest constructed of wood,
concrete, and steel; at lock 30 there are crib dams across the north and south channels of Rock River. The north dam has a 60-foot opening and has been superseded by a concrete
power dam a short distance below; the south dam adjoining lock 30 has been reinforced with concrete laid in the water.




                                                                                                                                                                                                                                                                                                               C/
                                                                                                                                                                                                                                                                                                               -4
                                                                                                                                                                                                                                                                                                               -4

                                                                                                                                                                                                                                                                                                               Hf
950       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-Fully complied with.
  STerminal facilities.-None.
   Operations and results during fiscal year--Regular funds.-The
work during the fiscal year consisted of repairs to locks, bridges,
buildings, telephone lines, fences, canal banks, aqueducts, and plant.
Houses and bridges were cleaned and painted. Maintenance dredg-
ing was performed in Rock River pool, canal prism, aqueducts, seep
ditches, and creek channels. Canal banks were riprapped where
needed. The costs during the year were $150,332.12; the expenditures
were $152,485.54.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1918. All locks (33 in number), dams, aqueducts, build-
ings, and other appurtenances are in fair condition. The channel
has an existing depth of approximately 7 feet, a bottom width of
52 feet, and a water surface width of 80 feet, except at aqueducts,
where the width is 40 feet and at locks, 35 feet.
   The total cost to June 30, 1937, from regular funds, was $7,833,-
162.52 of which $7,580,143.41 was for construction and $253,019.11
was for operation and care. The expenditures were $7,819,087.46.
The costs and expenditures from Emergency Relief funds for re-
moval of snags and stumps in Rock River pool were $25,000, all new
work. In addition the sum of $4,143,282.27 was expended between
April 1895 and June 30, 1936, on the operation and care of the works
of improvement under the provision of the permanent indefinite
appropriation for such purposes.
   Proposed operations. The unexpended balance, including ac-
counts receivable at the end of the year, together with allotment of
$150,000 made since June 30, 1937, will be applied as follows:
Regular funds: Accounts payable, June 30, 1937---------------- $14, 167.23
Maintenance (operating and care) :
    Operations                                             260. 00
                                                      $9--------------------------------2,
    Ordinary repairs-----    ------------------------ 34, 240. 00
    Improvement and reconstruction ________------23, 800. 00
    Emergencies -------------------------------------        30. 86
                                                                       150, 330. 86

      Total regular funds----------------------------------                164, 498. 09
   It is estimated that $175,000 will be required to operate and main-
tain the project during the fiscal year 1939 as follows:
Operations ---------------------------    -------------------      $100, 000
Ordinary repairs---------------------------------------------        35, 000
Improvement and reconstruction --      ----------------------------- 35, 000
Emergencies---.    ----------------------------------------------     5,000

      Total       -----------------------------------------------              175, 000
             RIVERS AND HARBORS-ROCK ISLAND, ILL., DISTRICT                                                                     951
                                          Cost and financial summary

Cost of new work to June 30, 1937__------------------- --                                                       $7, 605, 143. 41
Cost of maintenance to June 30, 1937__---------------------                                                      4, 396, 301. 38

      Total cost of permanent work to June 30, 1937---------                                                    12, 001, 444. 79
Plus accounts receivable June 30, 1937----------------------                                                              92. 17

      Gross total costs to June 30, 1937____------------------                                                  12, 001, 536. 96
Minus accounts payable June 30, 1937------------------------                                                         14, 167, 23
     Net total expenditures    -------------------------                                                   1--
                                                                                                           1211,87,69.             73
Unexpended balance June 30, 1937----------------------------                                                             14, 405. 92

          Total amount appropriated to June 30, 1937---------                                               1212,001,775.          65

    Fiscal year ending June 30                 1933                    1934               1935           1936               1937


Cost of new work ..             ......                ............                  .      $505. 33    $24, 494. 67
Cost of maintenance- ---       _
                              ---          $167, 957. 26         $147, 687. 65          171, 100. 98   127, 762. 17       $150, 332. 12

                           -
       Total cost_ ----- -------             167, 957. 26            147, 687 65        171, 606. 31   152, 256. 84        150, 332. 12

Total expended_.----------------             183, 101. 64            135, 829. 32       150, 434. 01   136, 258. 86        152, 485. 54

Allotted----------------------...............175, 356. 05            139, 323. 54       286, 000. 00   129, 275. 12          9, 000.00


Balance unexpended July 1, 1936------------------------                                                               $157, 891. 46
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------------                                                                   9,000.00

      Amount to be accounted for---------------_--                                                                     166, 891. 46
Gross amount expended--------1---              __--  $156,189. 64
Less:
     Reimbursements collected -------    $2, 608.07
    Receipts from sales-------- --        1, 096. 03
                                                        3, 704. 10
                                                                                                                      152, 485. 54
      Balance unexpended June 30, 1937__                                                                                 14, 405.92
Outstanding liabilities June 30, 1937----------------                                                                    14, 173.22

     Balance available June 30, 1937-------------------                                                                     232. 70
Accounts receivable June 30, 1937-----------------------                                                                     92. 17

     Unobligated balance available June 30, 1937__ _______                                                                  324. 87
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937__---------------------------                                                               150, 000. 00
          Balance available for fiscal year 1938------------------                                                    150, 324. 87
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 3 - -__- - -       -
                                               ______________                                                          175, (00. 00
   1 Includes $25,000 Emergency Relief funds.
   2Includes $4,143,282.27 for operating and care under the permanent indefinite appro-
priation.
  $ Exclusive of available funds.

              3. MILL CREEK AND SOUTH SLOUGH AT MILAN, ILL.

  Location.-Mill Creek empties into South Clough about 1 mile
east of the town of Milan, Ill., and 6.5 miles above the mouth of
South Slough, which empties into the Mississippi River.
952                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Previous projects.-Adopted by the River and Harbor Act of
January 21, 1927. The costs and expenditures were $85.24. (For
further details see p. 1132, Annual Report for 1932.)
  Existing project.-This provides for floodgates in the walls of the
canal, or other devices for carrying the flood waters of Mill Creek
across the canal right-of-way into Rock River; for the construction
of a levee on the east bank of Mill Creek extending from the Chicago,
Rock Island & Pacific Railroad to the canal embankment; for the
construction of a levee on the west bank of Mill Creek and its exten-
sion in a westerly direction to a connection with Water Street at the
point E, shown on map in project document; and for the removal of
obstructions in Mill Creek and South Slough, at an estimated cost
of $87,500 for new work and $2,000 annually for maintenance.
   The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (Rivers and Harbors Committee Doc. No. 19,
71st Cong., 2d sess.). The latest published map is in the project
document.
   Terminal facilities.-None.
   Operations and results during fiscal year.-The work done during
the fiscal year consisted in the removal of debris from the spillway,
dredging silt from creek channel, and cutting brush from banks of
Mill Creek and South Slough. The cost of the work was $2,000, for
maintenance. The expenditures were $2,505.88.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932. At the end of the fiscal year the project was in good
condition. The total cost under the existing project to June 30,
1937, was $71,633.58, of which $63,633.58 was for new work and
$8,000 was for maintenance. The expenditures were $71,633.58.
  Proposed operations.-An allotment of $2,000, made since June 30,
1937, will be applied to minor hired labor, dredging, and snagging,
to maintain channel.
   The sum of $2,000 can be profitably expended during the fiscal
year 1939 to be applied                                 -to
                                dredging and snagging to maintain
channel.
                                              Cost and financial summary

Cost of new work to June 30, 1937__ --------------           -                                                       $63, 718. 82
Cost of maintenance to June 30, 1937     ---    --- ----- ___                                               __--       8, 000. 00

      Total cost of permanent work to June 30, 1937-------------                                                         71, 718. 82
Net total expenditures---------------------      --------- _                                                             71, 718. 82

           Total amount appropriated to June 30, 1937                                     ______--__                     71, 718. 82


          Fiscal year ending June 30                            1933            1934       1935              1936            1937


Cost of new work ..               .....-------------------- $2, 154. 09 --  -                          -
Cost of maintenance___----------.----                   ------------      $1, 102. 34    $1,508. 29        $3, 389. 37      $2, 000.00

Total expended _____.---------------..            ..           5, 793. 68   1, 102. 34    1, 508. 29        2, 883. 49       2, 505. 88
Allotted-.....__   ....... _   ...     ---
                                     .......---        ...    23, 866. 42   4,000.00      2, 000. 00 ------------            2, 000.00
            RIVERS AND HARBORS--ROCK ISLAND, ILL., DISTRICT                                                              953
Balance unexpended July 1, 1936---------------------------------                                                    $505. 88
Amount allotted from War Department Appropriation
   Act    approved      Apr.   9,     1935_   _____     --   -                 __            $1,067.89
Amount allotted from War Department Appropriation
Act approved May 15, 1936_--------------------------                                             932. 11
                                                                                                                   2,000.00

      Amount to be accounted for---2, ----------------------------                                                2505. 88
Gross amount expended------------------------------ $2, 634. 91
Less reimbursements collected------------------------       129. 03
                                                                                                                   2, 505. 88
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------------------------                                                        2,000,00
Amount available for fiscal year 1938---___ _----- -------------                                                   2, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1-------------------------------------                                                  2, 000. 00
   'Exclusive of available funds.

      4. EXAMINATIONS, SURVEYS, AND CONTINGENCIES-GENERAL

   The cost of work during the year. amounted to $103,109.05; the
expenditures were $107,649.74. The balance unexpended, including
allotment of $36,000 made since June 30, 1937, $52,382.10, will be
applied as needed during the fiscal year 1938 to payment of expenses
incurred under this heading. The additional sum of $65,000 can be
profitably expended during the fiscal year ending June 30, 1939.
                                    Cost and financial summary

Cost of new work to June 30, 1937-------------
Cost of maintenance to June 30, 1937--------------------------                                              $406, 458.26

      Total cost of permanent work to June 30, 1937------------                                              406, 458. 26
Undistributed costs June 30, 1937_                                                                             2, 000. 00

      Net total cost to June 30, 1937----------------                                                        408, 458. 26
Minus accounts payable June 30, 1937--------------------                                            _          1, 594. 95

     Net total expenditures---------------------------------                                                 406 863.31
Unexpended balance June 30, 1937_11111 11111111111111111__1                                                   16, 382. 10
         Total amount appropriated to June 30, 1937 -------------                                            423, 245. 41

         Fiscal year ending June 30              1933              1934               1935           1936             1937


Cost of new work--------          ------------
Cost of maintenance.--------------------
                                                    ---------------------------       ---
                                          $16, 060.36 $22, 936.49 $64, 394.88 $181, 515. 28
                                                                                                                 ------------
                                                                                                                   $103,109. 06

Total expended-----------------------16, 147. 07                 23, 172. 67        58, 518. 99   183, 292. 69      107, 649. 74
Allotted ---...-.-.--          ..----------
                                        .      49, 297. 23       24, 948. 18    135, 000. 00      195, 500. 00----.

Balance unexpended July 1, 1936-------------------------------      $124, 031.84
Gross amount expended--------__$11-------------------- $    401.53
Less reimbursements collected----------------------      4, 751. 79
                                                                     107, 649. 74

         Balance unexpended June 30, 1937__-------------------                                                   16, 382. 10
954           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937___________                                                            $1, 630. 78

    Balance available June 30, 1937-----------------------------                                            14, 751. 32
Amount allotted since June 30, 1937 -----------------------------                                           36, 000. 00

           Unobligated balance available June 30, 1937_-                                  -_____-___ 50, 751. 32
Amount that can be profitably expended in fiscal year
ending June 30, 1939, for maintenace ---------------------------                                           65, 000. 00
1 Exclusive of available funds.

           5. PLANT ALLOTMENT FOR ROCK ISLAND, ILL., DISTRICT

                                              Cost and financial summary
Undistributed costs June 30, 1937 _$1,                                                                      103, 547. 38
Plus accounts receivable June 30, 1937-------------------------                                             123, 261.92
      Gross total costs to June 30, 1937-------------------------                                     1, 226, 809. 30
Minus accounts payable June 30, 1937_______________ ____-___68,                                               930. 30

     Net total expenditures____ - --____-____         -     -                                         1, 157, 879. 00
Unexpended balance June 30, 1937_'-----------------------------                                           36, 138. 85
           Total amount appropriated to June 30, 1937---------------                                  1, 194. 017. 85

   Fiscal year ending June 30                       1933        1934         1935             1936              1937


Total expended......                     - ------------------
                                            ___         __             $1, 145, 106. 36     $13, 359. 64        -$587. 00
Allotted      ----------------------------------------                  1, 213, 867.82      -19, 849.97


Balance unexpended July 1, 1936-__                                   _                                      $35, 551. 85
Gross amount expended             -________________-____
                                                     $1, 091, 769. 52
Less-
    Reimbursements collected         $1,082, 705. 43     ----
    Receipts from sales- ---------        9, 651. 09
                                                      1, 092, 356. 52
                                                                                                              -587.    00
      Balance unexpended June 30, 1937----------------------                                                 36, 138. 85
Outstanding liabilities June 30, 1937 --------------------------                                             87, 328. 56

     Balance available June 30, 1937 ------------------------                                              -51, 189. 71
Accounts receivable June 30, 1937-----------------------------_                                             123, 261.92

           Unobligated balance available June 30, 1937------------                                           72, 072. 21

   6. UPPER MISSISSIPPI RIVER VALLEY, FLOOD CONTROL (ROCK
                        ISLAND DISTRICT)

  Location.-Along the Mississippi River between the mouth of the
Missouri River and the Illinois-Wisconsin State line in the States
of Illinois, Missouri, and Iowa.
  Existing project.-The Flood Control Act, approved June 22,
1936, authorized flood-control work at the following localities in the
upper Mississippi River Valley:
           RIVERS AND HARBORS-ROCK ISLAND, ILL., DISTRICT                                                        955


                                                                                            Estimated      Estimated
                                          Project                                           construc-      laosts of
                                                                                            tion costs     lands and
                                                                                                            damages

Green Island levee and drainage district no. 1, Iowa, raising and enlarging exist-
ing levee system to improve protection ............-----                                     $68, 000
Carroll County levee and drainage district no. 1, Illinois, raising and enlarging
existing levee system to improve protection- ._._----.                       ---_-            13, 200
Keithsburg drainage district, Illinois, raising and enlarging existing levee system
to improve protection---------                     ---------------------------                11, 000 ...........
Henderson County drainage district no. 3, Illinois, raising and enlarging existing
system to improve protection---------------                 -------------------------- 13, 600 .........
Green Bay levee and drainage district no. 2, Iowa, raising and enlarging existing
levee system to improve protection--    ..-------      _-__            ____ ---
Gregory drainage district, Missouri, raising and enlarging existing levee system
                                                                                    --....... 100, 000     -.......-.-
  to improve protection.- -          ___----.-----.--.-          _         _.-.-
Fabius River drainage district, Missouri, raising and enlarging existing levee
                                                                                               44, 400       -...........
system to improve protection__ __.___                         ___.__        __     _          82, 000 ..........
South Quincy drainage and levee district, Illinois, raising and enlarging existing
levee system to improve protection_-____                 __...............-__-                46, 000             $500
South River drainage district, Missouri, raising and enlarging existing levee
  system to improve protection.......-----------------------------------------37, 000 .... ... ..
Sny Island levee district, Illinois, raising and enlarging existing levee system to
  improve protection--         ----------------------------------------------- 63, 000                     ..........
Riverland levee district, Missouri, raising and enlarging existing levee system to
  improve protection             ---------------------------------------------                 73, 000 _ ........
       Total--------------------------------------------------------                            551, 200             500


    Local cooperation.-See page 6. With the exception of Green
Island levee district no. 1, Iowa; Carroll County levee and drainage
district no. 1, Illinois; Keithsburg drainage district, Illinois, and
Riverland levee district, Missouri, local interests have furnished
satisfactory assurances that they will fully comply with the condi-
tions of local cooperation as set forth in section 3 of the Flood Control
Act.
    Operations and results during fiscal year-Emergency Relief
funds.-Surveys, borings, and engineering studies necessary for the
preparation of definite detail designs were completed. Definite
projects were submitted and approved. The costs for the year were
defrayed from Emergency Relief funds for "assistance for educa-
tional, professional, and clerical persons, 1936-1937."
    Condition at end of fiscal year.-Work under the definite projects
has not been started. There have been no costs or expenditures
charged to the project.
    Proposed operations.--The sum of $257,000 allotted during the
fiscal year ending June 30, 1938, will be applied as follows:
    Raising and enlarging existing levee system to improve protection
in the following levee districts:
Project:
     Gregory drainage district, levees, Missouri--------------------- $44, 400
     Fabius River drainage district, levees, Missouri ---------------- 82, 000
     Sny Island levee and drainage district, levees, Illinois---------- 71, 000
     South Quincy levee and drainage district, Illinois---------------  46, 000
     Henderson drainage district no. 3, Illinois----------------------  13, 600

                Total --------------------------------------------------                                     257, 000
   The additional sum of $137,000 can be profitably expended during
the fiscal year 1939, as follows:
956            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Raising and enlarging existing levee system to improve protection
in the following levee districts:
Project:
    South River drainage district, Missouri______________________ $37, 000
    Green Bay levee and drainage district no. 2, Iowa----------------100, 000
                Total                                          -------------                       -------                      137, 000

                                           Cost and financial sullmmary

Total amount appropriated to June 30, 1937_______________________----------
Amount (estimated) required to be appropriated for completion
  of existing project------------------------------------------   $551. 200
Amount that can be profitably expended during fiscal year ending
June 30, 1939, for new work_________________________________                                                                   137, 000
   1 Exclusive of $257,000 allotted since June 30, 1937.

           7. ROCK RIVER BASIN, ILL. AND WIS., FLOOD CONTROL

  Location.-Rock River Basin in the States of Illinois and
Wisconsin.
  Existing project.-The Flood Control Act approved June 22, 1936,
authorized the construction of flood-control work in the Rock River
Basin, Ill., and Wis., at the following localities:

                                                                                                              Estimated     Estimated
                                               Project                                                        construc-       costs of
                                                                                                              tion costs      damages
                                                                                                                             damages

Penny Slough near Hillsdale, Ill., levees and drainage ditches to protect agricul-
tural community-....._._ _............_                      ...      __---------------------_                 $109, 000       -.
Janesville and Indian Ford Dams, Wis., provide floodgates for flood control to
  communities around Lake Koshkonong and in Fort Atkinson- .-------                               -----           29, 000   .
Freeport on Pecatonica River in Illinois, channel rectification for protection of
  people and city property........................---------------------------------------------                  463, 000            $103, 000
      Total---------       ------.....----------------------------------------                            .     601,000               103, 000



   Local cooperation.-See p. 6.
   Operations and results during fiscal year- nEmergency relief
funds.-Surveys, borings, and engineering studies necesary for the
preparation of definite detail design for the Penny Slough and
Janesville and Indian Ford Dams projects were completed. Similar
work for the Freeport project was in progress. A definite project
for the work in Penny Slough was submitted and approved. The
costs for the year were defrayed from Emergency Relief funds for
assistance for educational, professional, and clerical persons, 1936-37.
   Condition at end of fiscal year.-Complete investigation of the
Janesville and Indian Ford project shows that the relief anticipated
is not practicable. Work under the other two projects in this basin
has not been started. There have been no costs or expenditures
charged to the project.
   Proposed operations.-An allotment of'$109,000 made during fiscal
year ending June 30, 1937, will be applied to the construction of
               RIVERS AND HARBORS-ST. PAUL, MINN., DISTRICT                                                     957
levees and drainage ditches to protect agricultural community in
Penny Slough near Hillsdale, Ill.
   No additional funds can be profitably expended during the fiscal
year 1939.
                                       Cost and financial summary
Total amount appropriated to June 30, 1937--                                                       -------

Amount (estimated) required to be appropriated for completion of
existing project-----------------------------------------------1                                   $572, 000. 00
1 Exclusive of $109,000 alloted since June 30, 1937.

Status of reports called for by river and harbor acts and committee resolutions

           Locality               Authorization act       Transmitted to      Document no.          Recommenda-
                                                              Congress                                   tion

Des Moines River, Iowa_          Rivers and Harbors       Dec. 10,1936          _              -    Unfavorable.
                                   Committee resolu-
                                   tion, July 31, 1935.
    Do----      ----------- Senate committee res- . __do -----------....                                Do.
                              olution, Aug. 21,
                                   1935.
Illinois and Mississippi         River and     Harbor .-                            --
  Canal,     Ill.,    Illinois    Act, July 3, 1930.
River to Mississippi
River at Rock Island.
Mississippi River be-            Rivers and Harbors       May 25, 1937     Rivers and Harbors        Favorable.
tween Missouri River              Committee resolu-                         Committee, 34, 75th
  and      Minneapolis            tion, Apr. 30, 1935.                      Cong., 1st sess.
 (damage seepage).
Quincy Bay and Willow            Rivers and Harbors
Slough, Ill.                      Committee resolu-
                                  tion, Feb. 11, 1937.




IMPROVEMENT OF RIVERS AND HARBORS                                                                   IN THE
          ST. PAUL, MINN., DISTRICT
   This district includes the Mississippi River and its tributaries from
its source to and including the Wisconsin River; Red River of
the North, Minn. and N. Dak., and its tributaries; and those waters
in north Dakota north of the Missouri River watershed.
   District engineer: Maj. Dwight F. Johns, Corps of Engineers.
   Division engineer: Col. J. N. Hodges, Corps of Engineers.
                                                  IMPROVEMENTS

                                                       Page                                                     Page
1. Mississippi River between          7. Plant allotment_                                                        966
       mouth of Wisconsin River
                                            FLOOD CONTROL PROJECTS
       and Minneapolis, Minn___   916
2. Reservoirs at headwaters of        8. Dry Run, Iowa, flood con-
       Mississippi River .......  958       trol _-_-_-      -     _- _                                           967
3. Black River, Wis              961  9. Lake Traverse and Bois De
4. St. Croix River, Wis. and               Sioux River, S. Dak., flood
       Minn_                      962       control                                                               968
5. Minnesota River, Minn ....    964 10. Minnesota River, Minn. (Lac
6. Examinations, surveys, and               Qui Parle Reservoir), flood
       contingencies (general) __ 965        control________                                                      968
   1. For report on this improvement see page 916.
958                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

           2. RESERVOIRS AT HEADWATERS                                              OF MISSISSIPPI RIVER

  Location.-Reservoirs are located on the Mississippi River and
several of its tributaries, in Itasca, Beltrami, Hubbard, Aitkin, Cass,
and Crow Wing Counties, Minn., as follows:

                                                                    Outlet                                                Area

         Name of reservoir                                                                            Water-
                                                              River                       Above St.    s ed        Original      Reser-
                                                                                            Paul                    lake          voir

                                                                                           Miles      Sq. miles    Sq. miles Sq. miles
Winnibigoshish-------------......      ....     Mississippi --------------------              408         1, 442        117      179. 4
Leech Lake-......---...------------..........   Leech _.. .........--     - - - - -           410         1, 163        173      250. 9
Pokegama-----............-------......          Mississippi........--------------------       344            660         24       35. 0
Sandy Lake---_-----. ------                     Sandy...------------------------              267            421           8      16. 6
                      -   -----------
P in e R iver--. - -..........                  P in e--..            ...          . _        199            562         18       23.7
Gull Lake--...........-------------..........   Gull_____                       __            168            287         20       20. 5



   Previous project.--Adopted by the River and Harbor Act of June
14, 1880. The cost and expenditures were $782,662.10-$681,805 being
for new work and $100,857.10 for maintenance of such reservoirs as
were completed prior to 1894. These expenditures were prior to the
adoption of the existing project in 1899. For further details see
page 1888 of the Annual Report for 1915.
   Existing project.-This provides for the reconstruction of the five
original reservoir dams, viz, Winnibigoshish, Leech Lake, Poke-
gama, Sandy Lake, and Pine River, and the construction of Gull
Lake Reservoir.
   The estimated cost revised in 1928, exclusive of amount expended
on previous projects, was $895,000. The estimated cost of operation
and maintenance of the reservoir, made in 1936, is $25,000 annually.
The above dams are of solid concrete construction, Pokegama being
built on bedrock and the others on pile foundations. The Sandy
Lake Dam includes a lock 160 feet long, 30 feet wide, with a maxi-
mum lift of 9.5 feet and a depth of 2.5 feet on the lower sill at low
water. The construction of an equalizing canal between Winni-
bigoshish and Leech Lake Reservoirs, at an estimated cost of $61,200
 (later increased to $71,200), was subsequently added to the project,
but no work was done, and this part of the project was abandoned in
the River and Harbor Act of March 4, 1915. The abandonment of
the ditches to connect Long Lake to Round Lake and Round Lake to
Gull Lake was recommended in House Documents No. 413, Sixty-
fourth Congress, first session, and was ordered by Congress in the
River and Harbor Act of July 27, 1916. Operation and maintenance
of the reservoirs were included in the project July 1, 1935, under the
provisions of the Permanent Appropriations Repeal Act approved
June 26, 1934.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for the reconstruc-
tion of four of the five original dams and surveys to determine the
extent of lands overflowed by the reservoirs; act of March 2, 1907,
provided for the reconstruction of Sandy Lake Dam and the con-
                 RIVERS AND HARBORS-ST. PAUL, MINN.,                                                       DISTRICT                   959
struction of Gull Lake Reservoir; act of June 25, 1910, provided for
the construction of an equalizing canal between Winnibigoshish and
Leech Lake Reservoirs (H. Doc. No. 363, 61st Cong., 2d sess.), but
this part of the project was abandoned in the act of March 4, 1915.
For maps, see pages 1973 and 1978 of Annual Report for 1911.
      Lower operating limits authorized by regulations approved Feb.                                                        4, 1936

                   Reservoir                               Minimum
                                                             stage                             Reservoir                        Minimum
                                                                                                                                  stage


Winnibiggshish -----------------------                              6.00     Sandy ---------------          --------                    7.00
Leech Lakelf                                                        1.00     Pine -------------------------------                       9.00
Pokegama ...                                     -6.00                       Gull----- - -----.....-- _ .........                       5.00



  Local cooperation.-Compliedwith.
  Terminal f acilities.-None.
  Operations and results during fiscal year.-The reservoirs were
operated and maintained. The lock gates at Sandy Lake Dam were
painted. Work was started on the repair of Pokegama Dam to seal
some leaks which had developed. Plans for sewage disposal systems
at five of the six reservoirs were prepared, and an installation was
completed at Gull Lake Dam. Minor repairs and improvements
were made to the appurtenant structures and grounds.
                                   Mean monthly stages for the fiscal year

                                                               1936                                                1937
           Reservoir
                                      July       Aug.      Sept. Oct.        Nov.     Dec.     Jan.     Feb. Mar. Apr.          May June

Winnibigoshish.____...  _ -              5. 23    4. 59     4. 31     3. 95 3. 78 3. 74         3.84    3.98    4. 35   4. 71    5. 68 6. 57
Leech Lake_____________                   .83       .31      .10     -. 12 -. 14 -. 08           .12     .29      .38     .56    1.10 1.54
P.okegama                                7. 70    6. 20     6. 05     5. 81 5. 98 6. 45         6. 88   6. 51   5. 45   6. 09    9. 64 10. 11
Sandy Lake_--              --            8. 94     7. 71    7. 55    7. 26    7. 23    7. 06    7.09     7.23   7.26    8.30 10.70 10.89
Pine River-         -... ____-_       12. 81      11. 79 11. 66 11.43        11.34 11. 13 11.02         11.00   11.00 11.61     13.61 14. 10
Gull Lake .                      --    6.08        5.70 5.62 5.39             5.29 5.41    5.60          5.60    5.25 5.47       6. 66 6 88



   The total costs for the year were $18,399.56, being $70.04 for new
work and $18,329.52 for maintenance. The total expenditures were
$18,834.09.
   Condition at end of fiscal year.-The project is completed except
for the acquisition of a small tract of land at Pokegama Dam, final
action on which has been delayed pending removal of minor defect in
title.
   The five dams originally built of timber have been reconstructed
of concrete. A concrete dam has been constructed at Gull Lake.
Three dikes at Winnibigoshish, 4 at Pokegama, 2 at Sandy Lake, and
16 at Pine River have been constructed. Flowage rights have been
acquired on practically all lands affected by the construction, main-
tenance, and operation of the reservoirs.
           20196-37--pt. 1-                      61
960             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                         Previous projects             Existing projects

               Reservoir                             Capacity                                                                   Total cost
                                                                        Com-             Cost       Com-
                                                                        pleted                      pleted


                                                     Cubic feet
Winnibigoshish.             _-------------     43,   430, 000, 000   1884 $214, 000. 00                1900    $173, 470.00     $387, 470. 00
Leech Lake------------------                   33,   230, 000, 000   1884    171, 805. 00              1902      84,380.00       256, 185. 00
Pokegama------ --------------                   5,   260,000,000     1884     85, 000. 00              1904     126, 030. 00     211,030. 00
Sandy Lake ------------------                   3    160, 000, 000   1895    114, 000. 00              1909     117, 020. 00     231, 020. 00
Pine River___-----------------                  7,   730, 000, 000   1886     97, 000. 00              1907     133, 320. 00     230, 320. 00
Gull Lake_--                ------------        3,   090, 000, 000 ---------        -                  1913      86, 826. 00      86, 826. 00
Surveys and flowage rights(An-
  nual Report 1915)--------            ..---    ..-----------------        --------------..                     160, 770. 04     160, 770. 04
       Total new work__..... ---------------- -------- 681, 805. 00                                 -           881, 816. 04 1, 563, 621. 04
Total maintenance_------__---      ....     ------------  100, 857. 10                             ---           39, 406. 86    140, 263.96
Permanent indefinite appropria-
tion for operating and care, Feb.
  1, 1895, to end of fiscal year 1936_-__--__ ___-_      _-                                        _             67, 197. 08
                                                                                                          -____ 9_________       967, 197. 08

       Total___-----------------          - 95,900, 000, 000 -------- 782, 662.10                              1,888,41998 2, 671, 082. 08



  All reservoirs and appurtenances were in good condition and in
operation at the end of the fiscal year.
  The total costs under the existing project to June 30, 1937, were
$921,222.90,ibeing $881,816.04 for new work and $39,406.86 for main-
tenance. The total expenditures were $920,655.13. In addition, the
sum of $967,197.08 was expended between February 1, 1895, and June
30, 1936, on the operation and care of the works of improvement
under the provision of the Permanent Indefinite Appropriation for
such purposes.
  Proposed operations.---The unexpended balance, including ac-
counts receivable at the end of the year, together with an allotment
of $21,000 made during July 1937, will be applied as follows:
Accounts payable, June 30, 1937-------------------------------$741. 95
Maintenance (operating and care):
    Operations                                                          000. 00
                                                                    1------------------------------
    Ordinary repairs-----------------------------------------           200. 00
    Improvement and reconstruction__     -____ ______---------,, -7, 000. 00
      Total operating and care                                         _---_            ---                                    24, 941. 95
Unallocated balance __________--                           -          __-___         _______                                    2, 013. 74
           Total, regular funds________
                                -__--   --                                               ----------------                      26, 955. 69
  The additional sum of $19,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance (operating and care) :
    Operations---        ---------------------------------------                                                          $16, 900. 00
    Ordinary repairs_  -----------------------------------------                                                               400. 00
    Improvement and reconstruction-_-__                                                                                     1,700. 00
           Total operating and care------------------------------19,000. 00

                                           Cost and financial summary
Cost of new work to June 30, 1937__    ___ __-___________-                                                            $1,563, 621. 04
Cost of maintenance to June 30, 1937________________________                                                           1,107, 461. 04
           Total cost of permanent work to June 30, 1937________--_                                                    2, 671, 082. 08
    1 Includes$967,197.08              for       operating and                 care      under     the        "Permanent        Indefinite
Appropriation."
                 RIVERS AND HARBORS-ST. PAUL, MINN., DISTRICT                                                                    961
Undistributed cost June 30, 1937 -                                    -_____--       -
                                                                         -------------                    ----            $174. 18

      Net total cost to June 30, 1937 ---------------------                                                        2, 671, 256. 26
Minus accounts payable June 30, 1937-------------------------                                                              741.95

     Net total expenditures ------     ------ ------------                                                       12,   670, 514. 31
Unexpended balance June 30, 1937---------         ----------                                                             5, 955. 69

           Total amount appropriated to June 30, 1937-----------                                                 12, 676, 470. 00


           Fiscal year ending June 30                          1933          1934             1935           1936               1937


Cost of new work-...----------------------.            $55.00 -----------                     $724.95        $881.70               $70.04
Cost of maintenance- .....-------...----------.... 12, 103. 74 $48, 385. 56                 22, 903. 13    16, 612. 52         18, 329. 52

        Total cost----...........-------------------......   12,158. 74    48, 385. 56      23, 628. 08    17, 494. 22         18, 399. 56

Total expended--------------.........------------. 14, 185.39              46,179.79        23,683.40      18, 705.77          18, 834. 09

Allotted.----         .---------..........             ...   14, 850. 68   45, 398. 35      22, 966. 10    17, 647. 64    -31, 005. 49,



Balance unexpended July 1, 1936------                  ------                                                           $55, 795. 2T
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936----------------------------------                                                                    3,500. 00
      Amount to be accounted for-----------------------                                                                  59, 295. 27
Deductions on account of revocation of allotment------------                                                             34, 505.49
      Net amount to be accounted for_--------------         -                                                            24, 789. 78
Gross amount expended-----------$-------------19, 000. 02
Less:
    Reimbursements collected------------         $120. 43
    Receipts from sales__--- __ _______---          45. 50
                                                           165. 93
                                                                                                                         18, 834. 09
      Balance unexpended June 30, 1937_________________                                                                   5, 955. 69
Outstanding liabilities June 30, 1937--------------------                                                                 1, 051.38
     Balance available June 30, 1937---                                                                                   4, 904. 31
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---                                                                                               21, 000. 00
      Balance available for fiscal year 1938--------------------                                                         25, 904. 31
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance         ____________________                                                                  19,           00
   1   Includes       $967,197.08            for operating         and     care     under      the "Permanent             Indefinite
Appropriation."
   2   Exclusive of available funds.

                                                  3. BLACK RIVER, WIS.

  Location.-The source of the river is in west-central Wisconsin.
The river drains an area of 2,270 square miles lying wholly in Wis-
consin, and flows in a general southwesterly direction a total distance
of about 160 miles to its confluence with the Mississippi River at La
Crosse, Wis., 698.2 miles above Cairo, Ill., and 154.8 miles below the
lower Northern Pacific Railway bridge at Minneapolis. The portion
of the stream included in this improvement extends from the mouth
to a point 1.4 miles upstream. (See U. S. Geological Survey map of
Wisconsin, scale 1: 500,000 for general location).
  Existing project.--This provides for a channel depth of 9 feet below
the normal elevation of pool no. 8, substantially from bank to bank
and extending from the mouth to a point 1.4 miles upstream.
962          REPORT OF CHIEF OF ENGINEERS,                  U. S. ARMY, 1937

    The estimated cost of new work made in 1937 is $85,000. The
latest (1937) approved estimate of annual cost of maintenance is
 $2,500.
    The existing project was authorized by the River and Harbor Act of
August 26, 1937 (River and Harbor Committee Doc. No. 23, 75th
Cong., 1st sess.). This document contains the latest published maps.
   Local cooperation.-The existing project stipulates that local in-
terests furnish, free of cost to the United States, necessary rights-of-
way and suitable spoil-disposal areas for new work and for subse-
quent maintenance as required, and furnish assurances satisfactory to
the Secretary of War that they will construct adequate terminal facil-
ities open to the public on equal terms. While these requirements
have not been formally met, it is expected that local interests will
make the necessary commitments required.
   Terminal facilities.-None.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work not begun.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1938.
   The sum of $85,000 can be profitably expended during the fiscal
year 1939 in new work of dredging involved in the project. This
work would be carried on during the period July to October 1938.
                                    Cost and financial summary

Total amount appropriated to June 30, 1.937
Amount (estimated) required to be appropriated for completion              of
  existing project---------------------------                                   $85, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work ----------------------------                                85, 000

                         4. ST. CROIX RIVER, WIS. AND MINN.

   Location.-The source of the river is in northwestern Wisconsin.
It is about 160 miles long and for its greater part forms the boundary
between Wisconsin and Minnesota. It flows southwesterly and then
southerly into the Mississippi River at Prescott, Wis., 41.5 miles be-
low the Northern Pacific Railroad bridge, Minneapolis, Minn. The
portion included in this improvement extends from the mouth to
Taylors Falls, a distance of 52.3 miles. (See U. S. Geological Survey
map of Minnesota, scale 1: 500,000, for general location.)
   Existing project.-This provides for the maintenance of a channel
9 feet in depth and of suitable width from the mouth to Stillwater
 (24 miles), in connection with the improvement of the upper Missis-
.sippi River to afford a depth of 9 feet, and a channel 3 feet deep at
mean low water between Stillwater and Taylors Falls (28 miles),
also the improvement of the harbor and water front at Stillwater.
The ordinary fluctuations between mean low and mean high water
are about 7.5 feet at Osceola and about 17.8 feet at Stillwater.
    The estimate of cost of new work, revised in 1927, was $150,400.
The latest (1935) approved estimate for annual cost of maintenance
is $5,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 18, 1878, provided for dredging, etc., for
a 3-foot channel between the mouth and Taylors Falls (H. Doc. No.
         RIVERS AND HARBORS-ST.            PAUL, MINN., DISTRICT              963
75, pt. 6, 43d Cong., 2d sess.); act of June 3, 1896, provided for the
harbor and water front at Stillwater; act of January 21, 1927, pro-
vided for the 6-foot channel to Stillwater (H. Doc. No. 378, 69th
Cong., 1st sess.); and the act of August 30, 1935, provided for a
9-foot channel from the mouth to Stillwater (H. Doc. No. 184, 72d
Cong., 1st sess.).
   The latest published map is in House Document No. 1008, Sixty-
fourth Congress, first session.
   Terminal facilities.-At Stillwater there is a concrete-paved levee,
550 feet long and 40 feet wide, sloping from the top of the river bank
to the water. There is also a piling and timber trestle wharf on the
right bank, of which 276 feet is dock and 96 feet approach. At other
points along the river landings are made on the banks. The facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-A total of 876 snags
was removed from the river between Taylors Falls and the mouth.
The snags consisted mainly of old logs, stumps, and piling. The
workwas done by hired labor and Government plant.
   The costs for the year were $1,222.31 for maintenance. The ex-
penditures were $5,622.02.
   Condition at end of fiscal year.-All new work was completed in
1930. The extension to provide a 9-foot channel from the mouth to
Stillwater is dependent upon and will be completed with the com-
pletion of Dam No. 3 of the Mississippi River project. The maxi-
mum draft that could be carried June 30, 1937, was 4 feet; below
Stillwater, 9 feet.
   The total costs to June 30, 1937, were $217,151.25, being $150,-
409.50 for new work and $66,741.75 for maintenance. The total ex-
penditures were $217,151.25.
   Proposed operations.-The unexpended balance, together with an
allotment of $11,000 made during July 1937 will be applied as
follows :
Maintenance :
   Removal of snags between Taylors Falls and Stillwater by hired
      labor and Government plant, August 1937-_______-------    - $1, 000. 00
    Dredging channel between      Stillwater and mouth of river, by
     hired labor and Government plant, as navigation needs require_ 16, 000. 00

       Total for all work___-     ______--____-- -______-____          17, 000. 00
    Unallocated balance _-----------------    -       -___-         -____4, 011. 97
      Total, regular funds_------------                -_              21, 011. 97
   The sum of $17,000 can be profitably expended during the fiscal
year 1939 in maintenance dredging between Stillwater and mouth of
river, as navigation needs require.
                          Cost and financial summary
Cost of new work to June 30, 1937--------_________________-__       $150, 409. 50
Cost of maintenance to June 30, 1937_                                 66, 741. 75
      Total cost of permanent work to June 30, 1937______-___         217, 151.25
Net total expenditures---------------------___                        217, 151.25
Unexpended balance June 30, 1937--------------                  -      10, 01.97
      Total amount appropriated to June 30, 1937_-----                227, 163. 22
964                   REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


              Fiscal year ending June 30                                     1933          1934         1935          1936            1937


Cost of new work ...............-                                                                           -.-- -           - --
Cost of maintenance................
                    -------------------                                    $3, 942. 83   $8, 980. 00    $877. 22    $5, 665. 72 $1, 222. 31
Total expended.......................-----------------------                7, 425.48     8, 980. 00     877.22      1, 266.01        5,622.02
Allotted-----------------------------...................................    4,982. 59    10, 956. 52   8, 459. 11   6. 000. 00..


Balance unexpended July 1, 1936----------------------------                                                                   $15, 633. 99
Gross amount expended-------------------------- $5, 642. 29
Less reimbursements collected------------------------- 20. 27
                                                                                                                                   5, 622.02

     Balance unexpended June 30, 1937----------------10,                                                                             011. 97
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937   --------------------------------------                                                                  11, 000. 00
      Balance available for fiscal year 1938-------------------                                                                   21, 011. 97
Amount that can be profitably expended in fiscal year ending June
                                 - - -- -- - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1939, for maintenance 1                                                                                                      17, 000. 00
     LExclusive of available funds.

                                                    5. MINNESOTA RIVER, MINN.

   Location.-This river has its source in South Dakota, about 35
miles from Browns Valley, Minn. It is about 400 miles in length,
its general direction of flow being easterly, and it empties into the
Mississippi River at St. Paul, Minn. For general location, see United
States Geological Survey map of Minnesota.
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 2, 1867, and modified by the River and
Harbor Acts of August 11, 1888, and July 13, 1892. The costs and
expenditures were $117,542.79 for new work, all prior to adoption of
existing project in 1892. For further details see page 1890 of annual
report for 1915.
   Existing project.-This provides for open-channel improvemerint
from the Mississippi River to Shakopee (25.6 miles). The object to
be accomplished by this improvement is to obtain a channel with 4
feet of water from the Mississippi River to Shakopee, whicl will
accommodate vessels of 3-foot draft. The fluctuation in level from
mean low to mean high water is 8.6 feet, and from extreme low to
extreme high water 19.7 feet.
   The estimate of cost for new work, made in 1892, was'$10,000, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $1,000.' The
existing project was adopted by the River and Harbor Act -of July
13, 1892 (p. 2209 of the Annual Report for 1891). The latest pub-
lished map will be found on page 1574 of the Annual Report for 1888.
   Terminal  facilities.-None.                        .      .
   Operations and results during fiscal year.-Removal of a'rock
ledge at Petersons Bar, about 12 miles above the mouth, was com-
pleted July 26, 1936, by hired labor and Government plant. A total
of 2,719 cubic yards of sand, gravel, and rock were:removed.
  SThe cost for the year were $3,582.67 for maintenance. The ex-:
penditures were $3,970.82.     .                               .
                 RIVERS AND HARBORS-ST. PAUL, MINN., DISTRICT                                                                                 965
   Condition at end of fiscal year.-The project was completed in 1931,
A draft of 3 feet is practicable between the mouth and Shakopee
for the full navigation season. Navigation by steamboat is impos-
sible except at medium and high stages. The maximum draft that
could be carried June 30, 1937, at mean low water was 3 feet from
the mouth to Shakopee. The total costs under the existing project
to June 30, 1937, were $40,266.99, being $12,730.69 for new work and
$27,536.30 for maintenance. The total expenditures were $40,266.99.
   Proposed operations.--No operations are contemplated for the
fiscal years 1938 and 1939.
                                                        Cost and financial summary
Cost of new work to June 30, 1937__________ _____---_$130,273.48
Cost of maintenance to June 30, 1937------------------------                                                                           27, 536. 30
      Total cost of permanent work to June 30, 1937__---------                                                                       157, 809. 78
Net total expenditures-----___-________
                       .   .157,                                                                                                          809. 78
Total amount appropriated to June 30, 1937_____--------------                                                                        157, 809. 78

           Fiscal year ending June 30                                              1933                1934     1935         1936          1937


Cost of new work---...------------------------------------------------------
Cost of maintenance--__ - ...... _ .......          _        ----       417. 33
                                                                       $_                                                                 $3, 582. 67
Total expended                     __-_.........-_...__-..               _           104.05      -----------------------      29. 18       3, 970. 82

Allotted     ...........-------------                        ---------------------------------------                        4,000.00

Balance unexpended July 1, 1936__-----           __----                                                                     _----_-$3, 970. 82
Gross amount expended_____------ ----------             ___$4,                                                         036.03
Less reimbursements collected ------------------          __                                                            65. 21
                                                                                                                                    3, 970. 82

    6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)
    The cost of work during the year was $59,207.41 and the expendi-
tures $61,333.17. The unexpended balance, including accounts re-
ceivable at the end of the year, together with an allotment of $32,000
made during July 1937, will be applied as needed during the fiscal
year 1938 to payment of expenses incurred under this heading. The
ladditional sum of $40,000 can be profitably expended during the
fiscal year ending June 30, 1939.
                                                         Cost and financial summary
Cost of new work to June 30, 1937                                                                _____________________
Cost of maintenance to June 30, 1937                                                             _-------       ---                 $461, 864. 28
      Total cost of permanent work to June 30, 1937__________   461, 864, 28
Undistributed costs June 30, 1937 ------    --       -----------     595. 37
      Net total cost to June 30, 1937____________----------_____________
                                                       ---                                                                          462, 459. 65
Plus accounts receivable June 30, 1937-----------------                                                                               8, 125. 45
      Gross total costs to June 30, 1937 - -----------           ______                                                             470, 585. 10
Minus accounts payable June 30, 1937______        --------------- __                                                                  3,993.38
     Net total expenditures 1__---             --------                                                                             466, 591.72
Unexpended balance June 30, 1937--------____----------                                                                               13, 617.34
           Total amount appropriated to June 30, 19371_---                                                                 ____     480, 209. 06
  1 Includes $14,341.31 from permanent indefinite appropriation for "Gaging waters of the
Mississippi River and its tributaries."
966            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


          Fiscal year ending June 30                        1933                 1934            1935            1936              1937


Cost ofnew work- ..                                       ---        i-----------                       -- I,-                            -
Cost of maintenance___---------------
                              ..                       $36, 631. 32       $66, 763. 35     $142,132. 21      $81, 338. 28       $59, 207.41
Total expended__..___.__________________               109, 620. 11         25, 847. 64     173, 400. 00       80, 000. 00       61, 333. 17
Allotted.                                                       .           ..            _ -_    _        -            .-       13, 000.00


Balance unexpended July 1, 1936-------------------------------  $61, 950. 51
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936------------------------------------------ 13,000. 00

      Amount to be accounted for------------------------------                                                               74, 950. 51
Gross amount expended_                               $149, 002. 14
Less:
     Reimbursements collected------------------------87, 668. 97
                                                                                                                             61, 333. 17

      Balance unexpended June 30, 1937-------------------------                                                              13, 617. 34
Outstanding liabilities June 30, 1937- -       -       -                                                                      4, 617. 72

     Balance available June 30, 1937-----------                                                                               8,999. 62
Accounts receivable June 30, 1937------------------------------                                                               8,125. 45

     Unobligated balance available June 30, 1937----------------                                                             17, 125. 07
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------- ----                                                              32,000.00

     Balance available for fiscal year 1938---------------------                                                             49, 125. 07
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance "_--                       ----------                                                           40, 000. 00
   2Exclusive of available funds.

             7. PLANT ALLOTMENT FOR ST. PAUL, MINN., DISTRICT

                                           Cost and financial summary

Undistributed costs June 30, 1937----------                                                                           $1, 827,225.51
Plus accounts receivable June 30, 1937-------------------                                                                  85, 955. 36

     Gross total costs to June 30, 1937----------------------                                                         1, 913, 180. 87
Minus accounts payable June 30, 1937--------------------- ----                                                           200, 317.75

     Net total expenditures----------------------------------                                                          1,712,863. 12
Unexpended balance June 30, 1937-----------------------------                                                            250, 346. 06
          Total amount appropriated to June 30, 1937--------------                                                     1, 963, 209. 18

    Fiscal year ending June 30                  1933                 1934                 1935                 1936               1937


T otal expended.......       .....-------------------
                                       ........       _..            ..                 $254,417.16        $28, 442. 21      $1, 430, 003. 75

Allotted ..----------............................----------------------------           333, 036. 35       626, 774. 13            398.70
                                                                                                                              1,003,
           RIVERS AND HARBORS-ST. PAUL, MINN., DISTRICT                         967
Balance unexpended July 1, 1936------------------------------          $676, 951. 11
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 ______________ $119, 398. 70
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936 ________-----934, 000. 00
                                                                      1, 053, 398. 70
Amount to be accounted for______________________________              1, 730, 349. 81
Deductions on account of revocation of allotment ------- __               50, 000. 00
      Net amount to be accounted for___           _                   1, 680, 349. 81
Gross amount expended______________________ $2, 415, 997. 46
Less:
    Reimbursements collected------- $983, 630. 32
    Receipts from sales --   _____     2, 363. 39
                                                    985, 993. 71
                                                                      1, 430, 003. 75

      Balance unexpended June 30, 1937_  -- _______-- __----   __       250, 346. 06
Outstanding liabilities June 30, 1937_______________ $97, 205. 45
Amount covered by uncompleted contracts_________       163, 665.23
                                                                        260, 870. 68

      Balance available June 30, 1937___________           _____       -10, 524. 62
Accounts receivable June 30, 1937___________              ______         85, 955. 36
      Unobligated balance available June 30, 1937      ___________        75, 430. 74

                   8. DRY RUN, IOWA, FLOOD CONTROL

  Location.-The works covered by this project are a flood retention
reservoir on Dry Run about 1 mile southwest of Decorah, Iowa, and
channel improvement downstream.
   Existing project.-The existing project provides for a flood-reten-
tion reservoir on Dry Run about 3 miles above its confluence with
the Upper Iowa River at Decorah by means of a dam 40 feet high,
with spillway and outlet works, together with channel enlargement
downstream. The existing project was adopted by the Flood Control
Act of June 22, 1936, with estimated construction cost of $91,000;
estimated cost of lands and damages $29,000.
  Local cooperation.-See page 6.
   Operations and results during fiscal year.-Field surveys, borings,
and studies for the development of construction plans were under-
taken. These investigations are still in progress.
   Condition at end of fiscal year.-Investigations have not been com-
pleted. Construction work has not begun. The cost of surveys and
investigations to June 30, 1937, were charged to emergency relief
funds for assistance for educational,            professional,       and clerical
persons.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939.
                          Cost and financial summary
Total amount appropriated to June 30, 1937----------

Amount (estimated) required to be appropriated for completion of
existing project------------------------------------------------ $91, 000
968      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   9. LAKE TRAVERSE AND BOIS DE SIOUX RIVER, S. DAK., FLOOD
                          CONTROL

   Location.-The works covered by this project are a reservoir at
Lake Traverse, Minn. and S. Dak., and about 5 miles south of the
North Dakota-South Dakota boundary, and approximately 38 miles
of improvement of the Bois de Sioux River downstream from Lake
Traverse, of which 5.6 miles form the boundary between Minnesota
and South Dakota and. the remainder is between Minnesota and
North Dakota.
   Existing project.-The existing project provides for a flood-con-
trol and water-conservation reservoir at the site of Lake Traverse
by the construction of an earth dam with necessary control gates and
spillway located near White Rock, S. Dak., and such levees and
embankments as are necessary at the southern end of Lake Traverse,
and the improvement of the channel of the Bois de Sioux River
downstream to facilitate the discharge of flood waters. The existing
project was adopted by the Flood Control Act of June 22, 1936, with
estimated construction cost of $1,115,200; estimated cost of lands
and damages, $284,800.
  Local cooperation.-See page 6.
   Operations and results during fiscal year.-Field surveys, borings,
and studies for the development of construction plans have been
completed. Preparation of specifications and detailed drawings for
construction are practically complete.
   Condition at end of fiscal year.-Investigations have been com-
pleted. Construction work has not begun. The costs to June 30,
1937, were defrayed from emergency relief funds for assistance for
educational, professional, and clerical persons.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939, due to nonfulfillment of
conditions of local cooperation.
                       Cost and financial summary
Amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion
of existing project -   ------------------------------------- $1, 115, 200

10. MINNESOTA RIVER, MINN., FLOOD CONTROL (LAC QUI PARLE
                        RESERVOIR)

  Location.-The works covered by this project are a reservoir on
the Minnesota River about 10 miles northwest of Montevideo; the
diversion of flood waters of the Chippewa River into the reservoir
and improvement of the Minnesota River between Montevideo and
Granite Falls, Minn.
  Existing project.-This provides for a flood-control and water-
conservation reservoir by the construction of an earth dam with nec-
essary control gates and spillway located in the Minnesota River
immediately below the mouth of the Lac Qui Parle River; a dam
and control works in the Chippewa River, together with diversion
canal through Watson Sag to the proposed reservoir; and the re-
moval of some of the ledges in the Minnesota River between Monte-
            RIVERS AND HARBORS-ST. PAUL, MINN., DISTRICT                                                       969
video and Granite Falls. The existing project was adopted by the
Flood Control Act of June 22, 1936, with estimated construction
cost of $464,000; estimated cost of lands and damages, $974,000.
  Local cooperation.-See page 6.
   Operations and results during fiscal year.-Essentially,this project,
including the construction of scenic highways and park areas, has
been sponsored by the Minnesota State Department of Conservation
and construction undertaken by the Works Progress Administra-
tion as a work-relief project on the assumption that the Works
Progress Administration program would be continued until the
completion of the project and that the allocation of sufficient Works
Progress Administration funds to complete the work would be
available. Aside from the inclusion of scenic highways and park
areas, the main differences between the existing project and that
being constructed by Works Progress Administration are that, for
the latter, in connection with obtaining flowage the maximum flood
of record would not exceed elevation 943 at the proposed dam, the
lower limit of flood storage would be at elevation 936, and the
project has been amplified by the addition of an earth dike and fixed
crest spillway across the Minnesota River near the upper end of the
proposed reservoir to maintain Marsh Lake at a normal elevation
of 940 with added flood storage above that elevation. Between
normal pool elevation 936 and elevation 943 at the main control
dam, about 120,000 acre-feet of flood storage will be available, in-
cluding the capacity above the Marsh Lake Dam.
   Condition at end of fiscal year.-No work has been done and no
cost has been incurred under the provisions of the flood control act.
   Status of construction work undertaken by the Works Progress
Administration is approximately as follows:
                                                                                                            Percent
                                                                                                           Complete
Pain control dam, Minnesota River-------------------------------------
                                                                     65
Chippewa River Dam__--______________     ___                         98
Watson Sag diversion------------------------------------------------75
Marsh Lake Dam----------------------------------------------------0
Channel improvement, Montevideo to Granite Falls                       0------------------
   Proposed operations.-The project is now under construction un-
der direction of the Works Progress Administration, and will prob-
ably be completed by that agency. No work by the War Department
is contemplated during the fiscal years 1938 and 1939.
Status of reports called for by river and harbor acts and committee resolutions

        Locality           Authorization Act        Transmitted              Document No.               Recomen-
                                                    to congress                                           dation

Black. River, Wis....... River    and    Harbor     Mar. 25, 1937       River      and      Harbor     Favorable.
                            Committee resolu-                              Committee, 23, 75th
                            tion, Mar. 26, 1936.                           Cong., 1st sess.
Mississippi River be-     Senate committee res-
tween Missouri River      olution, June 6, 1935.
and Minneapolis, situ-
  ation at Minneapolis.
St. Croix River, Minn.    Senate committee res-     May 24, 1937 ........--------------------.......   Unfavorable.
and Wis.                  olution,     May   27,
                           1936.
970        REPORT OF CHIEF OF ENGINEERS,                    U. S. ARMY, 1937


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
             CHICAGO, ILL., DISTRICT
                         UPPER MISSISSIPPI VALLEY DIVISION

   This district lies partly within the upper Mississippi Valley divi-
sion and partly within the Great Lakes division. The portion
within the upper Mississippi Valley division includes the Illinois
River and its tributaries in Illinois, Indiana, and Wisconsin, together
with waterways connecting the Chicago and Calumet Rivers. For
portions within the Great Lakes division, see page 1263.
   District engineer: Lt. Col. Donald H. Connolly, Corps of Engi-
neers. Acting district engineer: Capt. S. N. Karrick, Corps of
Engineers.
   Division engineer: Col. J. N. Hodges, Corps of Engineers.
                                          IMPROVEMENTS

                                             Page                                  Page
1. Illinois waterway, Illinois.               970 4. Sangamon River Basin, flood
2. Examinations, surveys, and                          control_------------- --    988
      contingencies (general) ...-- -         985 5. Kankakee River Basin, flood
        FLOOD CONTROL PROJECTScontrol--------------
                                                                                   989

3. Illinois and Des Plaines River
      Basin, flood control-------             986
                             1. ILLINOIS WATERWAY, ILL.
  Location.-The Illinois River (entirely within the State of Illi.
nois), formed by the confluence of the Kankakee and the Des Plaines
Rivers, flows in a southwesterly direction and enters the Mississippi
at Grafton, Ill., about 38 miles above St. Louis.
   The Illinois Waterway comprises the Illinois River from its mouth
to the confluence of the Kankakee and Des Plaines Rivers, a distance
of 273 miles; the Des Plaines River to Lockport, a distance of 18.1
miles, and the Chicago Sanitary and Ship Canal and the south
branch of the Chicago River to Lake Street, Chicago, a distance of
34.5 miles. Also from a point 12.4 miles above Lockport, Ill., the
waterway comprises the Calumet-Sag Channel and the Little Calumet
and Calumet Rivers, to turning basin no. 5, near the entrance to Lake
Calumet, a distance of 24.3 miles.
   Previous projects.-The original project was adopted by the River
and Harbor Acts of August 30, 1852, April 10, 1869, July 11, 1870,
June 14, 1880, and March 2, 1907. The cost of work under these
projects was $3,017,370.06, of which $2,569,102.04 was for new work
and $448,268.02 was for maintenance. The expenditures were $3,-
144,650. (For further details see p. 1945 of Annual Report for 1915
and p. 1172 of Annual Report for 1932.)
   Existing project.-This project provides for a channel with least
dimensions of 9 feet in depth and 300 feet in width from the mouth
of the waterway to Lockport, Ill., to be secured by dredging, the
construction of locks and dams at Peoria, La Grange. Starved Rock,
Dresden Island, and Brandon Road, the construction of locks at the
lower end of the Marseilles Canal and Lockport, and the construction
of a dam at Marseilles; a navigable channel depth of not less than 9
feet of the present width as follows: Lockport, Ill., to Lake Street,
Chicago, via the main Sanitary Canal and the south branch of the
          RIVERS AND HARBORS-CHICAGO,         ILL., DISTRICT       971
Chicago River, a distance of 34.5 miles; Sag Junction, 12.4 miles
above Lockport, to Blue Island, Ill., via the Calumet-Sag Channel,
a distance of 16.2 miles, with three passing places 9 feet deep and
150 feet wide. The project also provides for a channel 9 feet deep
and 300 feet wide in Calumet and Little Calumet Rivers, from turn-
ing basin no. 5 to the eastern end of the Sag Channel, a distance of 8.1
miles, and for dredging at the entrance and to the south end of Lake
Calumet to a depth of 21 feet. The dredging in Lake Calumet is in-
cluded in the report for Chicago district, Great Lakes division. The
total length of the project from the mouth to Lake Street, Chicago, is
325.6 miles and from the mouth to turning basin no. 5, 327.8 miles.
   The estimated cost of new work, revised in 1935, is $30,189,500.
The estimate is exclusive of amounts expended on previous projects.
The latest (1935) approved estimate of cost for the operation and
care of locks and dams is $350,000 annually, and for channel main-
tenance $448,000 annually.
   The project authorized by the River and Harbor Act of January
21, 1927, provides for a channel 9 feet deep and 200 feet wide from
the mouth of the Illinois River to Utica, a distance of 231 miles; for
the modification of the two United States locks and dams; and for
the removal of the two State dams when title thereto had been trans-
ferred to the United States (Rivers and Harbors Committee Doc:.
No. 4, 69th Cong., 1st sess., and S. Doc. No. 130, 69th Cong., 1st
sess.). The act in adopting the project authorized the appropriation
of not to exceed $3,500,000 for carrying on,the work.
   The River and Harbor Act of July 3, 1930, provides for a navi-
gable channel depth of not less than 9 feet from Utica, Ill., to the
heads of the present Federal projects on the Chicago and Calumet
Rivers, distances of 94.6 miles to Lake Street and 96.8 miles to turn-
ing basin no. 5, respectively, to be secured by means of completed
dams, locks, lateral canals, and dredging begun by the State of
Illinois, in general accordance with the present plans of the State for
that work, and that as soon as practicable after the Illinois Water-
way shall have been completed in accordance with this act the Secre-
tary of War shall cause a study of the amount of water that will
be required as an annual average flow to meet the needs of a com-
mercially useful waterway, as defined in said Senate document (S.
Doc. No. 126, 71st Cong., 2d sess.), and shall, on or before January
31, 1938, report to the Congress the results of such study, with his
recommendations as to the minimum amount of such flow that will
be required annually to meet the needs of such waterway and that
will not substantially injure the existing navigation on the Great
Lakes, to the end that Congress may take such action as it may deem
advisable. The act in adopting the project authorized the appro-
priation of not to exceed $7,500,000 for carrying on the work.
   The River and Harbor Act of August 30, 1935, provides for com-
pletion of the slack watering by the construction of modern locks and
dams at La Grange and Peoria and for modification of the project
to provide for a channel at least 9 feet deep and 300 feet wide below
Lockport, the exact location and details of design of all structures
to be left to the discretion of the Chief of Engineers, and, for the
time being, that no change be made in the water authorized for navi-
gation of the Illinois River by act of July 3, 1930 (H. Doc. No. 184,
73d Cong., 2d sess.). This act also provides for the three passing
972     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

places along the Sag Channel and the authorized channel in the
Calumet-Sag route to turning basin no. 5, and dredging at entrance
of Lake Calumet subject to local cooperation (see p. 975) (H. Doc.
No. 180, 73d Cong., 2d sess.). Prior to the work authorized by the
1935 River and Harbor Act the three passing places and the 9- by
300-foot channel in Calumet and Little Calumet Rivers were author-
ized by the Public Works Administration under dates of October 31,
1934, and February 28, 1935, respectively.
   Operation and care of the locks and dams were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
   The Calumet and Little Calumet Rivers are located within ,the
limits of the Great Lakes division. The dredging in these rivers,
being a part of the 9-foot project, will be performed under the
:supervision of the upper Mississippi Valley division.
   The latest published map and profile of the Illinois and Des
Plaines Rivers are contained in House Document No. 184, Seventy-
third Congress, second session, and a map of the Calumet-Sag Chan-
nel is printed in House Document No. 180, Seventy-third Congress,
second session.
    Pertinent data for existing and proposed locks and dams area given
in the following table:
                                                                                                                                                                                                                                     Lock

                                                                                                                                                 Location
                                                                                                                                                                                                                       Dimensions              Depth on miter sills
                                                                                                                                                                                                                                                 at low water 1
                                                   Name
                                                                                                                                                                                                                                                                          H
                                                                                                                     Miles                                                                                             Available     Lift at
                                                                                                                     above                            Nearest town                                    chamber            forfull    low wa-     Lower      Upper
                                                                                                                     mouth                                                                                               width        ter 1



                                                                                                                                                                                                             Feet         Feet         Feet       Feet        Feet
Kampsville 2...............................................----------------------------------------------------.       31. 5   Kampsville, Ill.................----------------------------                       73         300     3 4. 3      3 10.1   4 7. 0
La Grange (old) ----------- ----------------------------------------                                                   77. 5   Versailles, Ill...        __-- -           __                                      73         300     11.14        65. 23 9. 1         C
                                                                                                                                                                                                                                                                              I
La Grange (new)---                        --------------------------------- --------                                   80. 2   7.8 miles below Beardstown, Ill                                   ..------------- 110         600     10.0          13.0    15. 5
Peoria--......---          --       -------------------------------------------                                       157.9    4.1 miles below Peoria, Ill..------                         ___--- _              110         600     11.0          12. 0   15. 5
Starved Rock                  ----------------------------------------------                                          231      Utica, Ill..-------         __         ______.-------------                       110         600     19.0          14.0    16. 85         W
Marseilles.......................................................------------------------------------------------.    244. 5   Marseilles, Ill.......------------..          ---------------                     110         600     24. 25        14.0    18. 6
                                                                                                                                                                                                                                                                          H




Dresden Island.....--------------------------------------------                                                       271. 5   Morris, Ill _            -          ______                                        110         600     21. 75        12. 25 16. 85
Brandon Road                    ---------------------------------------------                                         286      Joliet, Ill.......--------------------------.                                     110         600     34            13. 8   17. 85     l




Lockport-               .--- ----------------------------------------------                                           291.1    Lockport, Ill..-------.....--........----............---------------..            110         600    730.5-41       15.0 711.5-22.0

    1 Lifts and depths on miter sills, with the exception of Kampsville and old La Grange, are those obtainable with flat pools after the construction of new dams at Peoria and La
Grange on the Illinois River and dam no. 26 on the Mississippi River.
    2 Kampsville Lock and Dam to be removed upon completion of lock and dam no. 26, Mississippi River; previous project costs $444,100.
    a Lift and depth on miter sill based on low water unaffected by dam no. 26.
    4 Due to lowering of the steel sheet piling in 1934 and the decreased diversion from Lake Michigan in 1936, there is a depth of only 7.0 feet during the extreme low water, but for
the greater part of the navigation season there is a depth of 9 feet.
    6 La Grange Lock and Dam (old) to be removed upon completion of new La Grange Lock and Dam; previous project costs $485,034.
    6 Lift and depth on miter sill based on flat Kampsville pool.
    7 Variation in lift and depth on upper miter sill at Lockport is due to fluctuation of water surface in the Sanitary District Canal.
                                                                                                                                                                                                                                                                          H1
                                                                                                                                                        Dam
                                                                                         Lock-Continued
                                                                                         Lock-Continued                                                 Dam                                                           Estimated
                                                                                                                                                                                                    Percent- Year cost   to United
                                                                                                                        I                      .                                                     age of    of
                                Name                                                                                                                                                                                States under
                                                                                                                                                                                                    comple- comple- existin
                                                                               Type of con-           Character of                Kind
                                                                                                                                                     Type of con-           Character of              tion    tion             nroi-
                                                                                struction             foundation                                      struction             foundation                                     ect     I'




                                                                          i                     i                       i                      i                      i                        Ii




Kampsville ...... ............                 _._ __ __ Masonry....._ Piles in clay and
                                             . .......                                                                      Fixed.._.               Piles .---------- Piles in clay and                  100         1893                    (2)
                                                                         sand.                                                                                          sand.
La Grange (old) ........                       --.............----.....
                                                        --...
                                                            do ......  Piles in mud                                                                ---- do ..--...--- Piles in mud                       100         1889
                                                                         and sand.                                                                                      and sand.
Illinois River, mouth to Utica: Channel improve-                                                                                                                      ------------- --                                             8$2,773,498.95
                                                                                                                                                                                                                                   F


  ment by dredging in the Illinois River below
   Starved Rock, modification of 2 United States locks
   and dams and for the removal of the 2 State dams.
La Grange (new)_                                         Concrete .... Piles in sand ...                                    Movable (wicket         Concrete    and        Piles in sand....             46                             2, 70 0, 000. 00
                                                                                                                             type and weir           timber.
                                                                                                                             with A frame
                                                                                                                             crest).
Peoria-----------.......................-----------------------------.............do     --__          do
                                                                                                    ....         . ..       Movable (wicket                     - ...do- --------
                                                                                                                                                       do ....-----.                                     80                             2,966,000.00           -....
                                                                                                                             type).
Starved Rock-------------------------.......................................       do.              Rock .....              Movable (tainter
                                                                                                                                     Concrete a n d            Rock ....                                 100         1933.......          885, 314. 50
                                                                                                                                                                                                                                         8s                M
                                                                                                                             gates).   structural
                                                                                                                                       steel.
Marseilles     -
             .....................
Dresden Island .......-............................
                                                   -.-.....----.--                do_ _---- _- do .......
                                                                              --...
                                                                                   do._-._..
                                                                                                    -----         ---- do ......... ....do .......---------- ....
                                                                                                        do----------                                              do     -
                                                                                                                                                                  do - ___--
                                                                                                                                                                           -                             100
                                                                                                                                                                                                         100
                                                                                                                                                                                                                     1933
                                                                                                                                                                                                                     1933
                                                                                                                                                                                                                                   I8 1,853,725.45
                                                                              ....              __do......... -...do....-....---                                  do__----                                                              2, 504, 000. 00
Brandon Road ...................................
Lockport.. .....................................--
                                                                              ... do........ ----.do-----........
                                                                                   do._--_
                                                                               -....         .....do_
                                                                                                                            ---
                                                                                                                       do _._._-_-
                                                                                                                                 .. ---..
                                                                                                     ..._..-- Movable (sector .....
                                                                                                                                          do ---------
                                                                                                                                                .....
                                                                                                                                    .-. do ..........
                                                                                                                                                              ....do..........
                                                                                                                                                             .-- do__-------
                                                                                                                                                                             do---------,
                                                                                                                                                                          ----
                                                                                                                                                                                                         100
                                                                                                                                                                                                         100
                                                                                                                                                                                                                     1933
                                                                                                                                                                                                                     1933
                                                                                                                                                                                                                                        2, 026, 000.00
                                                                                                                                                                                                                                                 -do
                                                                                                                                                                                                                                           115, 000. 00    M
                                                                                                                             gates).
                                                                                                                                               .I                                                    .     .     .        .   .

       Total locks and dams---...................                                                                                                                                                                                      15, 823, 538. 90
                                                                                                                                                                                                                                                           ci
                                                                                       ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT
Dredging:
    Little Calumet and Calumet Rivers....                              ------------------------------------------------------------------------------------------------ $1, 607,
                                                                                                                                                                            6, 000.
                                                                                                                                                                                 0. 00
                                                                                                                                                                        $60---------1
    Calumet Sag, 3 passing places-----825,000.0.-------------------------------------------------------------------------------------------------------825,000.00
    Starved Rock to Lockport----------------------------------------------------------------------------------------------------3,                                          182, 000. 00
    Starved Rock to Grafton-           -         -
                                           - ---------------------------------------------------------------------------------------------------------                      1,_ 0
                                                                                                                                                                         5......
                                                                                                                                                                         5,118,000.00
Laind and flowage easements-...-------------------------------------------------------------------------------------------------------                                   1,860,000.00                                                                      h


Mi scellaneous .---- -------------- ------          ------------------ -----------          --------------- -------------------     -------- --------------------- 1,     , 773, 961. 10
                                                                                                                                                                         1,-----------
                                                                                                                                                                                                                                                           CD
       Total additional features....                       ----......
                                                                 -------------------------------------------------------------------------------------------------------
                                                                                                                                                             ... ..    ..                                                                   14,961.10
                                                                                                                                                                                                                                          365,             -J3




       Total existing project....................       .....                      -----
                                                                .....------------------------------ --..------------... -- -----...........-------                                          ------------------....                     30, 189. 500.00
     2Kampsville Lock and Dam to be removed upon completion of lock and dam no. 26, Mississippi River; previous project costs $444,100.
     6La Grange Lock and Dam (old) to be removed upon completion of new La Grange Lock and Dam; previous project costs $485,034.
     8 Actual cost.
     9 This does not include $460,500 for dredging in Lake Calumet.
         RIVERS AND HARBORS-CHICAGO,         ILL., DISTRICT       975
   Recommended modifications of project.-Under date of February
23, 1937, the Chief of Engineers recommended modification of the
existing project so as to provide for the realinement of the naviga-
tion channel at its authorized dimensions of 9 feet depth and 300 feet
width from about One Hundred and Thirtieth Street on the Calumet
River in Chicago, Ill., to about One Hundred and Thirty-ninth
Street on the Little Calumet River in Burnham, Ill.; and that a cer-
tain described portion of the Calumet River in the city of Chicago,
counfy of Cook, be declared by Congress to be a nonnavigable stream
 (Rivers and Harbors Committee Doc. No. 19, 75th Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act of January 21,
1927, modified the existing project subject to the condition that the
State of Illinois transfer to the United States without cost all rights
and titles in the two State-owned dams on the Illinois River, and
that local interests furnish the United States without cost all neces-
sary areas for the disposal of materials dredged in creating and
maintaining the channel authorized (S. Doc. No. 130, 69th Cong.,
1st sess.). By deed dated March 28, 1928, the State of Illinois trans-
ferred these locks and dams to the United States.
    Permission has been granted by many riparian landowners for use
of their lands for the disposal of dredged materials.
    The act of July 3, 1930, modified the existing project subject to
the following provisions: That the project thus adopted shall be in
all its parts a navigable waterway of the United States, forever free
to the public use of all, unencumbered by any tolls or restrictions of
any kind whatsoever except such as may be imposed by Congress.
That the State of Illinois shall proceed, subject to the supervision
and approval of all expenditures and obligations by the Secretary of
War, to construct the highway bridges at Brandon Road and Mar-
seilles Canal, to make the necessary alterations in other highway
bridges across the Illinois waterway, to make the necessary arrange-
ments, and agreements for the alterations of the railroad bridges
across said waterway, and to do such other work on said waterway as
the Secretary of War shall direct and the available funds of the State
make possible; the bridges mentioned not to become the property of
the United States, and no obligations to be incurred by the United
States to maintain, operate, or replace them. That no claim shall
lie against the United States because of any contractual obligations
which have been or may be entered into by the State of Illinois as
regards the construction of a waterway between Utica and Lake
Michigan (S. Doc. No. 126, 71st Cong., 2d sess.).
    The State of Illinois appropriated $20,000,000 for the construction
of a waterway providing minimum 8-foot depths in channels not less
than 150 feet wide, from the upper end of the Federal project on the
Illinois River to Lockport. The lock and dam at Starved Rock was
about 95 percent complete, the Marseilles Lock was about 95 percent.,
the Marseilles Canal 98 percent, Dresden Island Lock and Dam about
20 percent, Brandon Road Lock and Dam about 70 percent, and the
Lockport Lock about 95 percent complete before the passage of the
River and Harbor Act of July 3, 1930.
    The River and Harbor Act of August 30, 1935, provides that local
interests furnish to the United States free of cost all necessary land
to effect the improvements recommended in House Document No. 180,
      20196---37--pt. 1--62
976     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Seventy-third Congress, second session, and furnish satisfactory evi-
dence to the Secretary of War that the 20 movable bridges across the
Sanitary Canal will be placed in operating condition, or otherwise
satisfactorily altered. For local cooperation affecting the project for
Lake Calumet, see report covering that improvement.
   The Public Works Administration, in allotting funds for con-
struction of three passing channels along the Sag Channel, accepted
the recommendation of the War Department that the requirement
with respect to 20 bridges be waived, provided highway bridges at
Lemont and Romeo and railroad bridge at Lemont were altered.
The conditions as to the construction of the three passing channels in
the Sag Channel were complied with by November 30, 1934, and
those as to dredging in the Calumet and Little Calumet Rivers on
January 30, 1935.
   Terminal facilities.-Of the 13 principal cities and towns along
the Illinois River, about 5 own dock frontage, more or less improved
for boat landings; 4 own dock frontage with no improvements; and
4 own no frontage except at street ends. Grain elevators are avail-
able at 23 points between Grafton and Morris, where grain can be
loaded directly into barges. A private coal-loading terminal is,
located at Havana. A cement-loading plant is located at Peru.
Sand and gravel plants are located at Kingston Lake and Lacon.
   At Peoria, the largest city on the river, there is a new $400,000
modern river-rail municipal public terminal, having an available
frontage of 1,100 feet; 205 feet is occupied by a dock house and 190
feet by an open dock. The dock house is served by a wharf boat 45
feet by 230 feet and an escalator capable of handling 1,000 tons a day.
This terminal is served by the equivalent of a beltline railroad. A
sand and gravel plant is located a short distance from Joliet on the
Des Plaines River.
   From the Chicago Sanitary and Ship Canal, sand, gravel, oil, and
gasoline are shipped from Lockport and stone from Lemont. A pri-
vate coal unloading terminal is located at Crawford Avenue, Chicago.
At Western Avenue, Chicago, bulk and package freight is handled
through the North Pier River barge terminal. At Damen Avenue,
Chicago, on the South Branch of the Chicago River is located the
newly completed State of Illinois barge terminal, including a 1,500,-
000-bushel grain elevator. A crude oil unloading terminal is lo-
cated on the Little Calumet River at Riverdale, just upstream from
the junction with the Sag Channel.
   Plans for further terminals and docks between Grafton and Chi-
cago are under way.
   Operations and results during fiscal year-Regular funds-New
work.-Work in connection with acquiring flowage easements was
continued at a cost of $18,300.40. Preliminary work in connection
with dredging, construction of lock and dam at La Grange; con-
struction of dam at Peoria; installation of tainter valves, Peoria
lock; construction of central control station at Peoria lock and con-
struction of permanent control house at Dresden Island was carried
on at a cost of $18,962.77.
   Alton pool.-A total of 1,715,546 cubic yards of material was re-
moved by contract at a cost of $277,141.84. A total of 5,200 cubic
yards of material was removed by Government plant at a cost of
 $1,636.05.
          RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT               977
    La Grange lock, dam, and pool.-A total of 3,047,192 cubic yards
.of material was removed by contract at a cost of $413,796.84. Work
was started on construction of new La Grange lock and dam, by
contract, and 46 percent was completed. The cost was $1,045,686.84.
    Peoria lock, dam, and pool.-A total of 993,089 cubic yards of ma-
terial was removed by contract at a cost of $763,142.28. Work was
started on installation of lock gates, tainter valves, etc., at Peoria
lock, by contract, and is 49.79 percent completed. The cost was
 $115,702.93. A total of $34,223.54 from maintenance and improve-
ment funds covered Government costs in connection with the con-
struction of a lock with guide walls, in the Illinois River, approxi-
mately 4.1 miles below Peoria, Ill., by Emergency Relief Administra-
tion contract.
   Dresden Island lock, dam, and pool.-A permanent control house
was constructed by contract at a cost of $18,493.24.
   Maintenance.-In miles 0 to 230, a total of 45,100 cubic yards' of
material was removed by hired labor and Government plant at a
cost of $21,612.32. The riprap on Plum and Leopold Islands and
Peoria pool, carried on by hired labor and Government plant is 95
percent complete. The cost was $3,523.50. Preliminary costs for
dredging between miles 41.6 and 223.2, and removing channel ob-
structions are $2,796.28. A total of 451,742 cubic yards of material
was removed by contract between miles 41.6 and 223.2 at a cost of
$92,097.58.
   Starred Rock lock, dam, and pool.-Clean-up dredging between
miles 241.0 and 242.0 was done at a cost of $133.30.
   Marseilles lock, dam, and pool.--.A total of 12,292 cubic yards of
material was removed by Government plant and hired labor between
miles 270.8 and 271.5 at a cost of $22,789.88 and 109,625 cubic yards
of material were removed by contract at a cost of $39,340.03. Aux-
-iliary plant used in connection with, but not a part of the contract,
worked 112 days at a cost of $3,794.42. Preliminary costs for dredg-
ing between miles 245.0 and 271.0 were $100.53.
   Dresden Island lock, dam, and pool.--A total of 19,698 cubic yards
of material was removed by Government plant and hired labor be-
tween miles 271.5 and 285.7 at a cost of $57,402.59, and 71,693 cubic
yards of material were removed by contract at a cost of $22,951.63.
Auxiliary plant used in connection with but not a part of the con-
tract worked 97 days at a cost of $4,858.39. Preliminary costs for
dredging were $59.02.
   All pools.-Work in connection with channel sweeping and naviga-
tion aids was carried on at a cost of $35,231.61. A total of 35 snags
was removed at a cost of $1,961.70.
   Discharge observations were taken throughout the year at different
points on the river; gage readings were continued and miscellaneous
surveys were made at a cost of $65,640.67.
   Operating and care of locks and dams.-Operatingand care forces
have been maintained through the year at the following locks and
dams: Kampsville, La Grange, Starved Rock, Marseilles, Dresden
Island, Brandon Road, and Lockport.
   The total cost was $249,670.69, including $15,908.86 for Kamps-
ville; $18,436.27 for La Grange; $5,949.83 for Peoria moorings,
Peoria, Ill.; $46,124.45 for Starved Rock; $22,141.90 for Marseilles
lock; $22,812.94 for Marseilles Dam; $3,930.39 for Goose Lake pump
978      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

house; $43,864.66 for Dresden Island; $34,805.23 for Brandon Road;
 $22,380.98 for Lockport; and $4,299.40 for Government moorings,
Joliet, Ill.
    A, four-car garage was constructed at Peoria moorings, Peoria,
Ill., by contract at a cost of $5,255.15 and a deep well was constructed
at Government moorings, Joliet, Ill., by contract, at a cost of
$3,760.63.
    The total cost was $3,331,050.87, of which $2,707,086.73 was for
new work, $374,293.45 for maintenance and $249,670.69 for operating
and care of locks and dams. The total expenditures were $2,967,-
627.08, all regular funds.
    Public Works funds-New work.--A total of 2,583,674 cubic yards
of material was removed from sections 1, 2, and 3 in the Calumet
and Little Calumet Rivers, by contract, at a cost of $798,584.93.
Preliminary work in connection with this contract cost $33,092.62.
Additional Government costs for construction of the three passing
places in the Calumet-Sag Channel were $3,621.68.
    The total cost was $835,299.23, all new work. The total expendi-
tures were $861,515.30.
    Emergency Relief funds-Ne work.-The contract for construc-
tion of a lock with guide wall in the Illinois River, approximately
4.1 miles below Peoria, Ill., is 80 percent complete. The cost was
$861,426.25. The cost of acquiring land and flowage easements was
reduced by $9,380.28.
    The total cost was $852,045.97, all new work. The total expendi-
tures were $1,053,650.06.
    The total cost, all funds, was $5,018,396.07, of which $4,394,431.93
was for new work, $374,293.45 for maintenance, and $249,670.69 for
operating and care of locks and dams. The total expenditures were
$4,882.792.44.
    Condition at end of fiscal year.-The existing project is approxi-
mately 55 percent completed. The three bypasses in the Calumet-
Sag channel are complete and dredging to widen the channel in the
Calumet and Little Calumet Rivers is in progress. This dredging
is about 60 percent complete.
    The locks and dams authorized by the act of July 3, 1930, have
been completed and a channel 200 feet wide and 9 feet deep has been
completed between Lockport and Utica. Under present conditions
of flow at Lockport, there is now a channel 200 feet wide and 9 feet
deep between Lockport and Utica. The two dams now existing at
Kampsville and La Grange are fixed and are in poor condition due
to advanced age, 44 and 48 years, respectively. The locks are in fair
condition. Upon the completion of the two locks authorized by the
act of August 30, 1935, the dams at Kampsville and La Grange will
be removed. A navigable channel now exists connecting the Missis-
sippi River at Grafton with Lake Michigan via the Illinois and Des
Plaines Rivers, the Chicago Sanitary Canal, and the Chicago River
with a secondary outlet to Lake Michigan via the Calumet-Sag Chan-
nel, the Calumet and Little Calumet Rivers. The controlling depth
of the river as it prevails, with a diversion of 5,000 cubic feet per
second from Lake Michigan through the Chicago Sanitary Canal
 (authorized until Dec. 31, 1938), is about 8 feet at or near Utica.
           RIVERS AND HARBORS-CHICAGO,            ILL., DISTRICT          979
This condition prevails only during extreme low water and will be
entirely eliminated in October 1937, as a result of contract dredging
now in progress. The limiting horizontal clearance in the section
Grafton to Utica is 118 feet; the limiting horizontal clearance in the
section Utica to Lockport is 113 feet. The limiting horizontal clear-
ance between Lockport and Lake Michigan via the Chicago Sanitary
Canal and the Chicago River is 72 feet. The limiting horizontal
clearance between Lockport and turning basin no. 5 in the Calumet
River via the Chicago Sanitary Canal, the Calumet-Sag Channel,
and the Calumet River is 50 feet. Seven locks and six dams have
been completed. (See table under Existing project, for description
and percentage of completion.)
   The following work remains to be done to complete that portion
of the project under the supervision of the Upper Mississippi Valley
Division.
   Completion of new lock and dam at La Grange and a lock and dam
at Peoria; lockkeepers' dwellings at Brandon Road and Lockport
locks; tainter gate cofferdams at all dams; capstan at all locks;
removal of old dam at Kampsville; removal of old dam at La
Grange; dredging to provide a channel 9 feet deep and 300 feet
wide, with adequate widening at critical points and bends; dredging
to secure a channel not more than 9 feet deep and 300 feet wide on
the Calumet and Little Calumet Rivers from the end of the Calumet-
Sag channel to turning basin no. 5.
   The total cost under the existing project to June 30, 1937, with
regular funds was $14,473,022.47, of which $12,283,811.74 was for
new work, $1,845,018.32 for maintenance, and $344,192.41 for operat-
ing and care of locks and dams. The total expenditures were
$13,817,477.37. In addition the sum of $2,316,089.96 was expended
between 1889 and 1936 on the operation and care of the works of
improvement under the provisions of the permanent indefinite appro-
priation for such purposes.
   With Public Works funds, the cost was $2,828,990.39 for new work.
and the total expenditures $2,759,039.14.
   With Emergency Relief funds, the cost was $1,486,895.65 for new
work, and the total expenditures $1,363,254.32.
   The grand total cost, all funds, was $18,788,908.51, of which
$16,599,697.78 was for new work, $1,845,018.32 for maintenance,
and $344,192.41 for operating and care. The grand total expendi-
tures were $17,939,770.83. In addition the sum of $2,316.089.96 was
expended between 1889 and 1936 on the operation and care of the
works of improvement under the provisions of the permanent indefi-
nite appropriation for such purposes.
   Proposedoperations.-The balance unexpended, including accounts
receivable, together with the allotment of $5,169,951 made since June
30, 1937, will be applied as follows:
                               REGULAR   FUNDS


Accounts payable, June 30, 1937---        _______-________
                                                        ----      $528, 453.56
New work :
   Land and flowage acquisitions required for
     La Grange and Peoria pools (hired labor)
      (July 1937 to June 1938) ______________      $80, 990. 00
980        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New work-Continued.
   Land and flowage easements, funds necessary
     to pay overhead, surveys, etc., in connection
     with court action and completion of pay-
     ment for land, Starved Rock to Lockport__              $18, 000. 00
   Surveys for flowage right-of-way and dredg-
     ing        -------------------------------               42, 000. 00
   Dredging below Starved Rock by hired labor
     and Government plant (July 1937)          _----__         1, 040. 00
   Removal of old dam at Kampsville by hired
     labor and Government plant (June to No-
       vember, 1938____--_----    _ ----------              250, 000.00
      Dredging miles 61.2 and 80.4 Alton pool (July
       1937 to October 1938) (continuing) __-----           274, 670. 00
      Dredging between miles 133.5 and 157.5, La
       Grange pool (July 1937 to September
       1938) (continuing) ------------------     -          653,285. 00
      Completion of continuing contract for con-
       struction of La Grange lock and dam (July
       1937 to September 1938) -----------------         1, 320, 229. 10
      Construction of central control station, La
       Grange lock and dam (by contract) (Sep-
       tember 1937 to June 1938) ---------------            160, 000. 00
      Construction of lockkeepers' dwellings, La
        Grange lock of dam (by contract) (Octo-
       ber to November 1937) _ _____---            _----- 20, 000. 00
      Construction of maneuver boat, La Grange
       lock and dam (by contract) (October 1937
        to April 1938)--------------------                    60, 000.00
      Construction of needle flats, La Grange lock
        and dam (by contract) (October 1937 to
       April 1938) __________________________-               20, 000. 00
      Buildings, grounds, etc., La Grange lock and
        dam (August 1937 to June 1938)_______-_-              60, 000. 00
      Dredging miles 223.27 and 229.59 (by con-
        tract), Peoria pool, to be completed in July
        1937---------------                                    3, 500.00
      Dredging in miles 230 and 231, Peoria pool
         (by contract) (July to November 1937)___           153, 732. 00
      Complete installation of lock gates, Tainter
        valves, and operating machinery, Peoria
        lock (by contract)      (July to December
        1937)                                              118, 735.00
      Completion of contract for Peoria lock (July
        to October 1937)_______________________             104, 629. 00
      Construction of Peoria Dam (by contract)
        (September 1937 to June 1938)______                 725, 460. 00
      Construction of central control station, Peo-
        ria (by contract) (September 1937 to June
        1938)___--   _______________________                147. 547. 00
      Construction of lockkeepers' dwellings, Peoria
        by contract) (October to November 1937)__             20, 000. 00
      Buildings, grounds, etc., Peoria lock and dam
         (August 1937 to June 1938) __-                       60, 000. 00
      Construction of maneuver boats, Peoria (by
        contract) (October 1937 to April 1938)      -         60, 000. 00
      Construction of needle flats, Peoria (by con-
        tract) (October 1937 to April 1938) ______            20, 000. 00
      Dredging below 8tarved Rock (by contract)
         (September 1937 to June 1938)-                      699, 960. 00
      Construction of lockkeepers' dwellings, Bran-
        don Road (by contract) (October to Novem-
        ber 1937) --------                                    20, 000. 00
           RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                                      981
New work-Continued.
   Dredging, Brandon pool, mile 289 to 290 (by
     contract) (October 1937 to June 1938)              -----     $700, 000. 00
   Dredging between Starved Rock and Lockport
     (by contract) (May 1938 to June 1939) __ _ _                  738, 951. 00
   Construction of lockkeepers' dwellings, Lock-
     port (by contract) (October to November
    1937)----------------                                           20,000.00
   Remedial work (by hired labor) (July 1937
     to .Tune 1938)       .        __,__7___ _                      7..000. 00
                                                                    75,
   Miscellaneous items, structures and plant_---_                   25, 000. 00
   Dredging Calumet and Little Calumet Rivers
     (completion of existing contract) (July
     1937 to May 1938) ------------------------                     78, 000. 00
   Unallocated balance ------------------------                      7, 587.00
          Total, new work_____________________ $6, 738, 315. 10
Maintenance :
   Miscellaneous surveys, including cross sections,
      discharge observations, and maintenance of
      gages                           _                 ---       $85, 000. 00
    Operating snag and dredge boats------------              7, 000. 00
    Navigation aids ----------------------------            16, 000. 00
    Maintenance sweeping----------------------              37, 000. 00
    Completion of existing contracts, intermittent
      dredging between mile 257.5 and mile 271.0
      (Marseilles pool) (July 1, 1937, to Feb.
      15, 1938) --------------------        __------------- 40, 961. 75
    Dredging, including removal of obstacles dis-
      closed by channel sweeping. to maintain
      channel depths and widths (July 1937 to
      June 1938):
        By contract ---------------------------           180, 970. 00
        By hired labor-------------------------           274, 571. 00
    Unallocated balance---------------------- --                219. 67

           Total, maintenance-------__----                                         $641, 722.42
Maintenance (operating and care of locks and
dams, etc.) :
    Operation-------                                              $185,210. 00
    Ordinary maintenance and repair                                 69, 950. 00
    Improvement and reconstruction-------------.                    61, 580. 00
   Unallocated balance-------------------------                     26, 360. 00

          Total operating and care of locks and dams, etc_____                      343,100.00
           Total regular funds--------------------------                     -    8, 251, 591. 08

                                     PUBLIC WORKS FUNDS

Accounts payable, June 30, 1937_---                -_                               $70, 035. 96
New work: Completion of existing contract: Little Calumet River,
  and portion of the Calumet River, Blue Island to turning basin
  no. 5 (July 1937 to May 1938) ---------------------       --                      580, 513. 44
           Total Public Works funds ---------------------------                     650, 549. 40
                                EMERGENOY RELIEF FUNDS

Accounts payable, June 30, 1937---    -----------------------.                      123, 752. 84
New work: Completion of existing contract: Construction of
  stripped lock with guide walls at Peoria, Ill. (July to Oc-
tober 1937)    - --  ----------------------------------------                      431, 797. 84

           Total Emergency Relief funds_                                            5559 550.68
982            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The sum of $6,750,000 can be profitably expended during the fiscal
year 1939, as follows:
New work:
   Removal of old dam at La Grange----------------- $100, 000
   Buildings, grounds, etc., at Peoria lock-------------     12, 000
   Dredging below Starved Rock----------------------1,      975, 000
   Cofferdam for Tainter gates_---------------------         84, 000
   Dredging between Starved Rock and Lockport-_-.        1, 743, 000
   Flowage and remedial works ----------------------        941, OC0
   Miscellaneous items, structures, and plant----------     984, 000
      Total, new work _____       -____-___________      __          $5, 839, 000
Maintenance:
    Miscellaneous surveys, including cross sections, dis-
      charge observations, and maintenance of gages .---    $90, 000
    Operating snag and dredge boats---------------------      6, 000
   Maintenance dredging       --    ---                     400, 000
   Maintenance sweeping-------------------------------40, 000
      Total, maintenance_______________________________________                                                         536, 000
Maintenance (operating and care of locks and dams, etc.) :
   Operation----------------------------------             $200, 000
   Ordinary maintenance and repairs-____         __         100, 000
   Improvement and reconstruction --------------------       50, 000
    Emergencies ---------------------------------------      25, 000

          Total operating and care of locks and dams, etc                                      --          --           375, 000

          Total                                                                                                       , 750, 000
                                                                                                                     6-------------------------------
  It is expected that, with the proposed expenditures, the project
will be about 100 percent completed.
                                          Cost and financial summary
                                 MAINTENANCE            AND IMPROVEMENT                FUNDS


Cost of new work to June 30, 1937__                                             --                  --      $14, 852, 913. 78
Cost of maintenance to June 30, 1937 _-                           --                                         14, 953, 568. 71

      Total cost of permanent work to June 30, 1937----------                                                   19, 800, 482. 49
Undistributed costs June 30, 1937------------------------                                                                    .63

          Net total cost to June 30, 1937-------------------------                                              19, 806, 483. 12
Plus accounts receivable June 30, 1937-------------                                                                       187. 77

      Gross total costs to June 30, 1937----------------------                                                  19, 806,670. 89
Minus accounts payable June 30, 1937------------------------                                                        528, 453. 56

     Net total expenditures-------------------------------                                                      19, 278. 217. 33
Unexpended balance June 30, 1937---------------------------                                                      3, 081, 452. 31

          Total amount appropriated to June 30, 1937                                 ------------               22, 359, 669. 64
  1Includes costs and expenditure of $2,316,089.96                            for operating and                 care under the
"permanent indefinite appropriation."

    Fiscal year ending June 30                 1933             1934                 1935                1936            1937

                   -$3,
Cost of new work-.............
Cost of maintenance       -----------.      497, 697. 11
                                            465, 228. 08
                                                             $495, 561. 90
                                                              695, 763. 89
                                                                               $25, 262. 53
                                                                               899, 504. 51
                                                                                                    $68, 049. 71
                                                                                                    729, 806. 72
                                                                                                                     $2, 707, 086. 73
                                                                                                                         623, 964. 14
       Total cost --------------          3, 962, 925. 19   1, 191, 325. 79    924, 767. 04         797, 856. 43      3, 331,050. 87
Total expended---..        -          -   4, 183, 138. 79   1, 417, 399. 00    701, 197. 54         572, 295. 26      2, 967, 627. 08
Allotted ____        ----..       -       4,903, 486. 97      870, 425. 88     738, 241. 81     5,600, 300. 18         -14, 000. 00
              RIVERS AND HARBORS-C(HIC(GO, ILL., DISTRICT                                                                 983
Balance unexpended July 1, 1936_________________                                                          $6, 063, 079. 39
Deductions on account of revocation of allotment___                                                            14, 000. 00

          Net amount to be accounted for __-------------                                                   6, 049, 079. 39
Gross amount expended_ _____                          __-------                  $2, 972, 812.73
Less reimbursements collected                             -_______-_                   5, 185. 65
                                                                                                           2, 967, 627. 08

      Balance unexpended June 30, 1937__-                                                                  3, 081, 452. 31
Outstanding liabilities June 30, 1937__     _-                                        $44, 240. 62
Amount covered by uncompleted contracts .....                                      2, 455, 535. 78
                                                                                                           2, 499, 776.40

      Balance available June 30, 1937_________                                                                 581, 675. 91
Accounts receivable June 30, 1937____      -_                                                                          187. 77
     UIrobligated balance available June 30, 19)37                                                             581, 863. 68
Amount allotted from War Department Civil AlpI)ropriation A.ct
approved July 19, 1937__-- _                                                                              5, 169, 951. 00

    Balance available for fiscal year 1938-       -                                                        5, 751, 814. 68
Amount (estimated) required to be appropriated for completion
   of    existing   project      -----------                                              --               5, 900, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2_                                                                                         5, 839, 000. 00
        For maintenance 2----                                                                                  911, 000. 00

        Total     -                                       --
                                                                                                      r    6, 750, 000.00
   2 Exclusive of available funds.
                                               PUBLIC WORKS             FUNDS

Cost of new work to June 30, 1937_                              ______________                            $2, 828, 990. 39
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937_                                                       2, 828, 990. 39
Plus accounts receivable June 30, 1937_______   ___                                                                      8-4. 71
          Gross total costs to June 30, 1937-__                                                      --    2, 829,075. 10
Minus accounts payable June 30, 1937                               -________                                    70, 035. 96
     Net total expenditures_                                                                               2, 759, 039. 14
Unexpended balance June 30, 1937_                                                                              650,    464.   69


          Total amount appropriated to June 30, 1937-----                                                   3, 409, 503. 83

   Fiscal year ending June 30              1933                  1934              1935            1936                1937

Cost of new work..$-----------------------$852, 687. 42                        $347, 508. 77    $793, 494.97       $835, 299. 23
Cost of maintenance-----------------        ------                            ------            ------------------
Total expended         __-------------___--------------        817, 003. 70     358, 535. 10     721, 985.04          861, 515. 30
Allotted---------------------------------                      910, 000. 00   2, 513, 000. 00    -1, 915. 35      -11, 580. 82

Balance unexpended July 1, 1936____________________________ $1, 523, 560. 81
Deductions on account of revocation of allotment--------------   11, 580. 82
      Net amount to be accounted for ______                    _              _____________                1, 511, 979. 99
Gross amount expended--_-----------__________      $864, 093.39
Less reimbursements collected __________-- ____ __    2, 578. 09
                                                                                                               861, 515. 30

     Balance unexpended June 30, 1937                                                                           50, 464. 69
                                                                                                               6----------------------
Amount covered by uncompleted contracts --------------------                                                   650, 549.40

     Balance available June 30, 1937-------------------------                                                         -84. 71
Accounts receivable June 30. 1937                           _____ _____------------
                                                            -..-                                                         84. 71
984          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                       EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937________ _____________                                       ___$1, 486, 895. 65
Cost of maintenance to June 30, 1937__
      Total cost of permanent work to June 30, 1937----------1, 486, 895. 65
Undistributed costs June 30, 1937________
                                       -------     __--              111.51

     Net total cost to June 30, 1937
                                   --   ________                                    _______--_               1, 487, 007. 16
Minus accounts payable June 30, 1937_____________                                   _________                   123, 752.84

         Net total expenditures__--- -----           __-                                              -1,      363, 254.32
DUnexpended    balance June 30, 1937___ __111111111111                                            1            480, 550. 68

         Total amount appropriated to June 30, 1937-------------                                            1, 843, 805.00

   Fiscal year ending June 30           1933           1934              1935                  1936                 1937


Cost of new work-...__   -.-    __ _   __        __
                                                -__-...........
                                                       __........_
                                                             __--... ...--..             $634,849.68              $852, 045.97
Cost ofmaintenance...-----------------------      -     ------       ---------------------------------
Total expended_----
              ......            ..........
                                  _        __
                                           .- _ ___-           __ .____
                                                               . _____.......-
                                                                             ..              309, 604. 26        1, 053, 650. 06

Allotted .........--
             -_-                            -         ------                    -       1, 843, 805. 00



Balance unexpended July 1, 1936 _____     __________     -
                                                      ____--   $1, 534,200.74
Gross amount expended_______________________ $1,054,491.48
-Less reimbursements collected ------------------      841. 42
                                                                1, 053, 650. 06

      Balance unexpended June 30, 1937______________-______                                                    480, 550. 68
Outstanding liabilities June 30, 1937________________  $5. 50
Amount covered by uncompleted contracts--------- 480, 545. 18
                                                                                                               480, 550.68

Amount alloted during July 1937--     --------------                                                            75,000. 00
Balance available for fiscal year 1938                                                                           5,000. 00
                                                                                                                7_________________--_

        CONSOLIDATED     COST' AND FINANCIAL           SUMMARY          FOR        ILLINOIS        WATERWAY


:Cost of new work to June 30, 1937 ----                                                                      168, 799. 82
                                                                                                       $-----19,
Cost of maintenance to June 30, 1937------------------                                                 1 4,953, 568.71


      Total cost of permanent work to June 30, 1937
Undistributed costs June 30, 1937 ____ _______-___
                                                                              -...--
                                                                               __-
                                                                                                  .
                                                                                                  _
                                                                                                            24, 122, 368. 53
                                                                                                                     112. 14
      Net total cost to June 30, 1937_-___--------                                                      24, 122, 480. 67
Plus accounts receivable June 30, 1937________________________                                                   272. 48
         Gross total costs to June 30, 1937 ...                                              __             24, 122, 753. 15
Minus accounts payable June 30, 1937-                            -            --        --                      722, 242. 36

     Net total expenditures__                                                                          123, 400, 510.79
Unexpended balance June 30, 1937_                                                                        4. 212, 467.68
         Total amount appropriated to June 30, 1937                                                         27, 612, 978.47
                                                                                                            2---__-----
  'Includes
permanent
                costs and expenditures of $2,316,089.96
               indefinite appropriation.
                                                                      for operating and care under the
                 RIVERS AND HARBORS-CHICAGO,                                            ILL., DISTRICT                        985

   Fiscal year ending June 30                1933              1934                    1935               1936            1937


Cost of new work_..---- ---             $3,497, 697. 11 $1, 348, 249. 32         $372, 771.30     $1,496, 394. 36     $4, 394,431.93
Cost of maintenance-- ___ ____         - 465, 228. 08       695, 763.89           899, 504.51        729, 806. 72         623, 964. 14

      Total cost --------------         3, 962, 925. 19   2, 044,013. 21        1, 272, 275.81     2, 226, 201. 08     5,018, 396. 07

'Total expended ---------------
                    __                  4, 183, 138. 79   2, 234,402. 70        1, 059, 732. 64    1, 603, 884. 56     4, 882, 792. 44
                     .
Allotted_..---.-.----.--__.       __    4, 903, 486. 97   1, 780, 425. 88       3, 251, 241.81    7,442, 189.83         -25, 580.82


Balance unexpended July 1, 1936    ______-------------$9,                                                            120, 840. 94
Deductions on account of revocation of allotments ----                                             ----               25, 580. 82

      Net amount to be accounted for                              ----------------                               9, 095, 260.12
Gross amount expended__                                                         $4, 891, 397. 60
Less reimbursements collected_--------                                     _          8, 605. 16
                                                                                                                 4, 882, 792. 44
      Balance unexpended June 30, 1937 ----          __--------4, 212, 467. 68
Outstanding liabilities June 30, 1937---------      44, 246. 12
Amount covered by uncompleted contracts-------- 3, 586, 630. 36
                                                                3, 630, 876. 48

     Balance available June 30, 1937---------                                           ---------                 -581, 591. 20
Accounts receivable June 30, 1937____                                                                                   2----------------72.48
Unobligated balance available June 30, 1937                                                                         581, 863. 68
Amount allotted during July, 1937_ _ __---- _---                                                                 5, 244, 951.00
     Balance available for fiscal year 1938-------------------5, 826, 814. 68
Amount (estimated) required to be appropriated for completion
of existing project 2_______________________________________  5, 900, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work --------------------------------             --  5, 839, 000. 00
   For maintenance -       ______---- --     -       --- ___911,         000. 00
                                                                            -      -          -           -
         Total "_________________________                                                                        6, 750, 000. 00
  : Exclusive of available funds.

    2. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                               (GENERAL)

  The cost of work during the year amounted to $42,915.42; ex-
penditures were minus $922.78. The balance unexpended June 30,
1937, including accounts receivable, $44,109.66, and allotment of
$17,000 made in July 1937, will be applied as needed during the fiscal
year 1938 to paymentof expenses to be incurred under this heading.
The sum of $55,000 can be profitably expended during the fiscal year
ending June 30, 1939.
                                        Cost and financial summ ary
Cost of new work to June 30, 1937_                                __------------------------------
Cost of maintenance to June 30, 1937-                                ____-__-________-___ $412, 485. 97
         Total cost of permanent work to June 30, 1937-----------                                                    412, 485. 97
986            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Undistributed costs June 30, 1937                                                                                                      .$620. 28
      Net total cost to June 30, 1937---------------------------                                                             413, 106. 25
Plus accounts receivable June 30, 1937---______________________                                                                1, 799. 83
     Gross total costs to June 30, 1937_________________________                                                             414, 906. 08
Minus accounts payable June 30, 1937 - --               _ __...                                                                2, 872. 82

           Net total expenditures -----------------------------------                                                        412, 033. 26
Unexpended balance June 30, 1937______________________________                                                                   42, 309. 83

           Total amount appropriated to June 30, 1937-------------_                                                          454, 343. 09

           Fiscal year ending June 30                            1933             1934                1935           1936                1937


Cost of new work--       --        --     --      --     --      --     ----         -   --    ----          -.      -- -.        ..      ..     .
Cost of maintenance .........---          ...... _-           $80, 431. 41     $55, 225. 34   $52, 854. 73        $43, 328. 84         $42, 915. 42
Total expended ...                      ....----------------------
                                                               78, 536. 85      57, 402. 59    50, 346. 87        89, 995. 83            -922. 78
Allotted        ------------------------
                                       ----                    81, 430. 36     103, 740. 61    57, 000. 00         72, 000. 00


Balance unexpended July 1, 1936-__________                                                                                   $41, 387. 05.
Gross amount expended...                               $49, 817. 81
Less :
    Reimbursements collected_____________ $50, 739. 59
    Receipts from sales         _                1. 00
                                                                                                         50, 740. 59
                                                                                                                                   -922.        78

      Balance unexpended June 30, 1937-------------------__                                                             _        42, 309. 83
Outstanding liabilities June 30, 1937--------------------------                                                                   2, 924. 34

      Balance available June 30, 1937-------------------                                                                         39, 385. 49
Accounts receivable June 30, 1937-------                                                                                          1, 799. 83

     Unobligated balance available June 30, 1937 -----------------                                                               41,185. 32
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_   -    ------
                                  ___    _        _                                                                              17, 000. 00

           Balance available for fiscal year 1938---------------                                                                 58,.185. 32

Amount that can be profitably expended in fiscal year ending
                                - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -
June 30, 1939, for maintenance                                                                                                  55, 000. 00
   'Exclusive of available funds.

     3. ILLINOIS AND DES PLAINES RIVER BASIN, FLOOD CONTROL
                        (CHICAGO DISTRICT)

  Location.-The flood-control improvements included in this project
are located in levee districts lying along the Illinois River above
Havana, in the State of Illinois.
  Existing project.-The Flood Control Act approved June 22, 1936,
authorized the following flood-control works in the Illinois and Des
Plaines River Basin, located in the Chicago, Ill., district, in accord-
ance with plans printed in House Document No. 182, Seventy-second
Congress, first session:
                 RIVERS AND HARBORS-CHICAGO,                               ILL., DISTRICT                     987


                                                                                          Estimated      Estimated
                                           Project                                        construc-      costofland
                                                                                          tion cost       and dam-
                                                                                                            ages


Liverpool drainage and levee district, Illinois, improve existing levee for addi-
  tional protection to people and property_ ---------------------------------                $48, 600         $8,400
Hennepin drainage and levee district, Illinois, levee and channel improvements
  for additional protection to people and property _... ----..............-     -             46, 800              6, 800
Banner special drainage and levee district, Illinois, improve existing levee for
  additional protection to people and property_                                              128, 700         10, 000
Rocky Ford drainage and levee district, Illinois, improve existing levee for addi-
  tional flood protection to people and property_                                             47,900               2, 400
Pekin and La Marsh drainage and levee district, Illinois, improve existing levees
  for additional protection to people and property-             _      - ---      ___        145, 300              7, 000
Spring Lake drainage and levee district, Illinois, improve existing levees for addi-
  tional protection to people and property-_ _                                               384, 200         10, 800
East Liverpool drainage and levee district, Illinois, improve existing levees for
  additional protection to people and property      _ ....... ....... .       . _ __         137, 700         13, 600
East Peoria drainage ap ilevee district, Illinois, improve existing levees for addi-
  tionlal protection to people and property ___ ________________________________              14, 050        (1)
Thompson Lake drainage district, Illinois, improve existing levees for additional
  protection to people and property ..........--------------------------------------
                                                                                __           156, 200              8, 100
                                                                                           1, 109, 450        67, 100

  I Uncertain.

   Local cooperation.-See page 6. Assurances required by the flood
control act have not been furnished for the East Peoria and Thomp-
son Lake drainage districts.
   Operations and results during fiscal year.--Definite projects were
submitted and approved for all of the nine districts lying above
Havana, in accordance with House Document No. 182, Seventy-
second Congress, first session.
   Condition at end of fiscal year.--Work has not been started.
   Proposed operations.-The sum of $320,300 allotted during the
fiscal year ending June 30, 1938, will be applied to construction
work on the following projects:
Hennepin drainage and levee district                                                            ___       $46, 800
Pekin and La Marsh drainage and levee district -- ___------                                               145, 300
Spring Lake drainage and levee district__                                                                 128, 200
         Total -       -     ----------                                                                   320, 300

  The sum of $618,900 can be profitably expended during the fiscal
year 1939 for wo-k on the following projects:
Spring Lake drainage and levee district (completion)--                                         __        $256, 000
Liverpool        drainage and levee             district----------                                         48, 00
Banner special drainage and levee district -----                    128, 700
Rocky Ford drainage and levee district ----------------------------  47, :00
East Liverpool drainage and levee district-------------------------137, 700

         Total -----------                                           ---       --------                    618,900

                                          Cost and financial summary

Total amount appropriated to June 30, 1937 ...........

Amount (estimated) required to be appropriated for completion
of existing project-----------------------------------------                                       $789, 150. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work--------------------------------------                                             618, 900
   1 Exclusive of $320,300 allotted since June 30, 1937.
988                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                            4. SANGAMON RIVER BASIN, FLOOD CONTROL

  Location.-The flood control improvements included in this proj-
ect are located on the Sangamon River and its tributaries in Illinois.
The Sangamon River is a tributary of the Illinois River.
  Existing project.-The flood control act approved June 22, 1936,
authorized the following flood control works in the Sangamon River
Basin, in accordance with reports published in House Document No.
186, Seventy-second Congress, first session:

                                                                                                                Estimated Estimated
                                                  Project                                                       construc- cost of land
                                                                                                                tion costs      dam
                                                                                                                           andages


Mouth of Sangamon River, Ill., clearing and enlarging flood channel to improve
  flood discharge_                                                                                                 $122, 400          1 $13, 600
Sangamon River from mouth of Salt Creek to Robey, Ill., channel straightening
                   __
  for flood relief --        _---- ------------------           ------------------               -----              773, 000           (1)
Salt Creek in vicinity of Middletown, Ill., channel straightening for flood relief__                                48, 000             1 5, 700
East of Hubley Bridge on south side of Salt Creek, Ill., raise and improve existing
  levee system to increase protection.---.---                                                                       20, 300                    800
Lussenhaf levee on north side of Salt Creek, Ill., raise and improve existing levee
  system to increase protection                          .         -------------------------------                    1, 850                   450
Swager, Whitney, Young-Holbite levee on north side of Salt Creek, Ill., raise and
  improve existing levee system to increase protection ...-----                              --------           -   10, 200                    600
Donavon levee on north side of Salt Creek, Ill., raise and improve existing levee
  system to increase protection ________________________ ------------------- ---                                    28, 400                  1, 100
Mason and Menard drainage district on Sangamon River near Oakford, Ill., raise
   and:improve existing levee system to increase protection-----                             ------------           78, 900                  4, 000
Tar Creek levee west of Oakford, Ill., raise and improve existing levee system to
  increase protection-----                .----            --------------------------                           -   34,800                     900
Watts levee on south side of Salt Creek, Ill., raise and improve existing levee sys-
   tem to increase protection__ ____ _____. __-____.                 . . . . . . . . . .- -... .
                                                              . . ___..                                             34, 400                  1, 650
Farmers levee and drainage district on north side of Sangamon River, Ill., raise
   and improve existing levee system to increase protection_----_-----.-----------141, 000                                                   5, 650
Clear Lake levee at junction of Sangamon and Illinois Rivers in Illinois, raise and
   im pr o ve e x is tin g le ve e s ys tem to in cr eas e p ro te ctio n . . . . . . .. . . . . . . . . . ..--     6 9 , 2 50 .             1, 500
Oakford special drainage district on south side of Sangamon River, Ill., raise and
   improve existing levee system to increase protection ...................-                              --.       25, 500                  2,200
Near Springfield on Sangamon River, Ill., alteration of Chicago and Illinois Mid-
  land R. R. bridge to improve flood channel...................,,            _                           .....    . 90,000         -----------
Sangamon River and Salt Creek, Ill., clearing and cleaning channels to improve
   flood discharge at 50 bridge sites                   _   -     -   -    -   -     -    -     -    -----            12, 500
Panther Creek West Side levee, Illinois, levees to provide flood protection---...--                                   96, 380           16, 250
Bell and Mertz levees, Panther Creek, and Sangamon River, Ill., raise and im-
prove existing levee system to increase protection ---------------------------                                       25, 900                  500
        Total-----------_     _        -__-..--------           ------------------------------------              1,612,780              44,900

  1 Assurances required by the Flood Control Act have not been furnished.

   Local cooperation.-See page 6.
   Operations and results during fiscal year.-Surveys were made on
the Farmers' Drainage District levees, the Bell and Mertz levee, Tar
Creek levee, Oakford special, Clear Lake, Panther Creek, Mason and
Menard, Swager, Hubly, Watts, and Donovan levees, and were com-
pleted April 15, 1937. The cost and expenditures were defrayed from
Emergency Relief funds for "Educational, professional, and clerical
services." Expenditures were $5,699.86 from Emergency Relief funds.
Definite projects were submitted and approved for 17 districts in
accordance with House Document No. 186, Seventy-second Congress,
first session.
   Condition at end of fiscal year.-Field surveys were completed and
no other work was started. There have been no costs or expenditures
charged to the project.
              RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                                 989"
  Proposed operations: The sum of $104,400 allotted during the fiscal
year ending June 30, 1938, will be applied to construction work on
the following projects:
Oakford special levee and drainage district__-------------------                      $$25,500
Mason and Menard levee and drainage district-----------------                          78, 900
       Total-- -             ____----- --------------------                           104, 400"
  The sum of $197,150 can be profitably expended during the fiscal
year 1939 for work on the following projects:
Lussenhaf levee                 ----------------------------------------              $1, 850'
Swager, Whitney, Young-Holbite levee--________-----___-------                         10,200,
Tar Creek levee---------                         ---------------------------          34, 800
Watts levee-----------------------------------                                        34, 400
Chicago & Illinois Midland Ry. bridge near Springfield, Ill                           90, 000
Bell and Mertz levee-----------                  -------      ---------------------   25, 900

       Total -------------------------------------------                               97, 150,

                                       Cost and financial summary
Total amount appropriated to June 30, 1937------------------     --------- _
Amount (estimated) required to be appropriated for completion of
existing project      -----------------------------------       1$1, 508, 380
Amount that can be profitably expended in fiscal year ending June
                           ---------------------------------
30, 1939, for new work________________________________                               197, 150
  1 Exclusive of $104,400 allotted since June 30, 1937.

5. KANKAKEE              RIVER BASIN (LEVEES BETWEEN                SHELBY       BRIDGE
                              AND BAUM'S BRIDGE, IND.)

   Location.-The proposed Kankakee River levees are located on the
right bank of the Kankakee River, 65.5 to 67.5 miles above the Wil-
mington Dam, and on the left bank, from 65.5 to 74.7 miles above
the Wilmington Dam.
   Existing project.-To furnish flood protection for 12,800 acres of
farm land, as well as highways and farm buildings, by constructing
12.3 miles of new levee. Estimated cost exclusive of right-of-way
 (revised 1937), is $167,600. The project was authorized by the Flood
Control Act approved June 22, 1936 (H. Doc. No. 784, 71st Cong.,
3d sess.). Estimated cost of lands, damages, pumping plants, cul-
verts, and ditches (revised 1937), is $100,400.
   Local cooperation.-See page 6. Assurances required by the
Flood Control Act have not been furnished.
   Operations and results during fiscal year.--Definite projects were
submitted and approved for levees between Shelby and Baum
Bridges in Indiana, in accordance with House Document No. 784,
Seventy-first Congress, Third Session.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939. The assurances required
by flood-control act have not been furnished, and there are no pros-
pects of their being furnished.
                                       Cost and financial summary
Total amount appropriated to June 30, 1937 ....
Amount (estimated) required to be appropriated for completion
of existing project_ -----      ____ - --      --    -- _- _$167, 600. 00
990             REPORT OF CHIEF OF ENGINEERS. U. S. ARMY, 1937

Status of reports called for by river and harbor acts and committee resolutions

                                                           Transmitted                                  Recommenda-
           Locality             Authorization act                                 Document no.
                                                           to Congress                                      tion


Calumet River, Little         Rivers and Harbors        May         8,1937                              Unfavorable.
  Calumet River, Grand          Committee resolu-
  Calumet River, and            tion, May 10, 1934.
  Sag Channel, Ill., and
  Grand Calumet River
and Indiana Harbor
  Canal, Ind.
Calumet Sag Channel,          Rivers and Harbors           Feb. 23, 1937      Rivers and Harbors        Favorable.
Ill.                           Committee resolu-                               Committee, 19, 75th
                                tion, Dec. 19, 1936.                            Cong., 1st sess.
      Do                      Rivers and Harbors
                                Committee resolu-                            -----------------------.
                                tion, Mar. 2, 1937.
Illinois River, Ill., from    Rivers and Harbors
   Grafton,     Ill.,    to     Committee resolu-
   Starved Rock lock and        tion, Feb. 5, 1937.
   dam near Utica, Ill.
Illinois River, Ill., dam-    Rivers and Harbors
   age    from    seepage,      Committee resolu-
   backwater, and floods.       tion, Feb. 10, 1937.
Illinois River, Ill., levee   Flood Control Com-
   construction,      Hager     inittee   resolution,
   Slough special drain-        July 28, 1937.
   age district in Cass
   County.
Meredosia Bay, Illinois       River and Harbor Act,
   River, Ill.                  Aug. 26, 1937.
Sangamon River, Ill.          Flood Control Com-
   (flood control).             mittee    resolution,
                                Apr. 14, 1937.



      IMPROVEMENT OF RIVERS AND HARBORS IN THE
              KANSAS CITY, MO., DISTRICT
   The improvement of the Missouri River and its tributaries from
the mouth to Rulo, Nebr. (about mile 514.8 1), is under the jurisdic-
tion of the Kansas City district, the section from Kansas City, Mo.,
to Rulo, Nebr., being included in report of Missouri River, Kansas
City, Mo., to Sioux City, Iowa.
   District engineer: Capt. J. M. Young, Corps of Engineers, to
July 3, 1936, and Lt. Col. P. A. Hodgson, Corps of Engineers, since
that date.
   Division engineer: Col. R. C. Moore, Corps of Engineers.
                                               IMPROVEMENTS

                                                    Page                                                         Page
1.    Missouri River, Kansas City                             6. Plant allotment                               1002
          to mouth          -                        991
                                                                        FLOOD CONTROL PROJECTS
2.    Missouri River, Kansas City,
          Mo., to Rulo, Nebr .....                   998       7. Kansas    Citys,   Mo. and
3.     "sage River, Mo_ ___                         998            Kans., flood control .....                  1002
4.    Ex ~minations, surveys, and                             8. Kansas River at Topeka,
          contingencies (general) __                1001            Kans., flood control-                       1003
5.    Other projects for which no                             9. Kansas River at Lawrence,
          estimates are submitted___                1002            Kans., flood control -_                     1004

                                              MISSOURI          RIVER

      Location.-The Jeffersoi, Madison, and Gallatin Rivers conjoin
at Three Forks, Mont., to form the Missouri River, which flows
southeasterly 2,473 miles across or along 7 States to the Mississippi
  1All     mileage is 1932 channel mileage above the mouth unless otherwise designated.
       RIVERS AND HARBORS-KANSAS CITY, MO., DISTRICT                 991
River, 17 miles above St. Louis.      For description, see page 1149,
Annual Report for 1932.
         1. MISSOURI RIVER, KANSAS CITY TO THE MOUTH
   Location.-See preceding paragraph. Practically the entire length
is contained within the State of Missouri.
   Previous projects.-The first appropriation for improvement by
regulation was made in the River and Harbor Act of June 18, 1878.
The original plan for comprehensive improvement was adopted by
the River and Harbor Act of August 2, 1882, modified by River
and Harbor Acts of July 5, 1884, September 19, 1890, and June 13,
1902.
    The cost and expenditures on all projects prior to that of 1912 were
$7,663,130.48, distributed as follows: Prior to project of 1902, $6,970,-
510.57 for new work and maintenance; subsequent to project of 1902,
$289,592.82 for new work, and $403,027.09 for maintenance. For
details of previous projects, see page 1891 of Annual Report for 1915.
   Existing project.-This provides for securing a permanent naviga-
ble channel with a minimum low-water depth of 6 feet and a mini-
mum width of 200 feet, with a reasonable additional width around
the bends, by means of bank revetment, permeable dikes to contract
and stabilize the waterway, removal of snags, and occasional dredg-
ing. Length of section under improvement (mouth to upper end of
Quindaro Bend), is 386.2 miles (1932 mileage). Ordinary and ex-
treme fluctuations of stage are 16 and 38 feet, respectively.
    The estimate of cost for new work, revised in 1936, is $72,000,000.
exclusive of amounts expended on previous projects. The estimated
cost for annual maintenance is $2,000,000.
    The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 1287, 61st Cong., 3d sess.), and modified
by the River and Harbor Act of August 8, 1917, which fixed the
upstream limit of the improvement at the upper end of Quindaro
Bend, 388 miles from the mouth, and provided for dredging (H. Doc.
No. 463, 64th Cong., 1st sess.); the River and Harbor Act of March
3, 1925, provided for a minimum width of 200 feet; and the River
and Harbor Act of August 30, 1935 (H. Doc. No. 238, 73d Cong., 2d
sess.), authorized completion of improvement from mouth to Sioux
City, Iowa. For latest published map see page 2876 of Annual Re-
port for 1919.
    Local cooperation.-The project provides that cooperation from
benefited localities may be required, in case a comprehensive plan is
adopted by Congress for an apportionment of expense, where any
improvement confers special benefit; and receipt of contributions
from private parties, to be expended with Government funds upon
authorized works where such would be in the interest of navigation,
is authorized by the River and Harbor Act of March 4, 1915. The
Secretary of War has approved the general principle of cooperative
construction on the Missouri River below Kansas City on the basis
that 25 percent of the cost of any special installation shall be paid
by the United States and 75 percent by the local interests.
    The total amount contributed by local interests in cooneration with
the United States from 1918 to June 30, 1937, was $665,662.80, of
which $8,647.11 was returned to contributors.
       20196-37-pt. 1-63
992     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   No work was done by private interests for the benefit of the
public during the fiscal year ending June 30, 1937.
   Terminal facilities.-At Kansas City, Mo., there is a municipal
terminal approximately 100 feet east of the Kansas-Missouri State
line consisting of a reinforced concrete and brick warehouse and
offices (300 by 85 feet), a machine shop (30 by 30 feet), a loading
platform, and an escalator. Approximately 400 feet downstream
there is a bulk-handling dock consisting of a 250-foot timber pile
railroad trestle and a concrete loading platform. A second munic-
ipal terminal at the foot of Main Street consists of a steel and
stucco warehouse (306 by 40 feet) and a reinforced concrete loading
platform (180 by 48 feet). A municipal terminal consisting of a
dock (60 by 700 feet) and an elevator (3-million-bushel capacity)
are under construction by the city of Kansas City, Kans., on the
right bank of the Missouri River just above the confluence of the
Kansas and Missouri Rivers. Oil-loading facilities for shipment of
petroleum products are maintained by private interests on the right
bank of the Missouri River approximately 2 miles above Kansas
City, Mo., and oil loading facilities are being constructed by private
interests on the right bank of the Missouri River approximately 7
miles above Kansas City, Mo. At Hermann, Mo., there are two
municipal warehouses and two elevators located approximately one-
fourth mile downstream from the Hermann highway bridge. The
foregoing facilities are considered adequate for existing needs.
    Operations and results during fiscal year-Regular funds-New
work.-This work consisted of the construction of 35 dikes totaling
9,103 linear feet by hired labor, seven pieces of revetment totaling
8,133 linear feet by hired labor, and two abatis totaling 999 linear
feet by hired labor, screening of two dikes totaling 115 feet, and the
removal of four dikes totaling 2,964 feet by hired labor at a cost of
 $446,994.26; prosecution of unallocated surveys by hired labor for
engineering and channel-rectification studies at a cost of $67,339.66.
    In addition to the above completed works, there are in the process
of construction one piece of revetment to total about 1,300 linear feet
by hired labor and three pieces of revetment to total about 7,060
linear feet by contract.
    The total cost of new work prosecuted with regular funds was
 $514,333.92.
    Regular funds-Maintenance.-This work consisted of the replace-
ment or repair of 19,919 linear feet of dikes, 70,522 linear feet of
revetment, and 1,071 linear feet of abatis by hired labor at a cost of
 $440,938.71; removal of 57,740 cubic yards of rock from one locality
by the U. S. dredge Keokuk at a cost of $50,756.39; removal of 53,-
622,133 cubic yards of material from 295 localities by U. S. dredges
Robert McGregor, William M. Black, Meriwether Lewis, William
Clark, William S. Mitchell, and Dundee at a cost of $996,113.90;
removal of 313 snags, 340 piles, part of 2 old wrecks, 5 loading docks,
part of old retard, 1 log, 2 old bridge piers, and 1 abandoned launch,
and destruction of 3 pieces of old mattress, 1 abandoned dredge hull,
and 2 abandoned barges by hired labor at a cost of $51,909.27; prose-
cution of channel surveys by hired labor for determination of the
results accomplished by the various works at a cost of $42,616.64;
marking channel by hired labor for navigation at a cost of $122,-
421.93; and stream gaging by hired labor for special studies and
working data at a cost of $5,613.22.
          RIVERS AND HARBORS-KANSAS                                          CITY, MO., DISTRICT                       993
  The total cost of maintenance prosecuted with regular funds was
$1,710,370.06; the total cost of all work prosecuted with regular funds.
was $2,224,703.98.
  Emergency Relief funds-New work.-This work consisted of the
construction of 10 dikes totaling 6,766 linear feet by contract at a
cost of $132,743.29; 1,359 linear feet of railroad spur at Gasconade
Boatyard by hired labor at a cost of $4,376.47; clearing the bank of
willows and engineering work in connection with a contract at a cost
of $183.07; and construction of 12 wooden barges by hired labor for
use in connection with work being done on the project at a cost of
$66,000.
   In addition to the above completed work, there is in the process of
construction by contract one piece of revetment to total about 1,500
linear feet.
   The total cost of new work prosecuted with emergency construc-
tion funds was $205,509.64 (Emergency Relief funds) (includes a
cost of $2,206.81 for dredging by the U. S. dredge St. Paul incurred
in fiscal year 1936).
   Emergency Relief funds-Maintenance.-This work consisted of
the replacement or repair of 499 linear feet of dikes by contract and
23,783 linear feet of revetment by hired labor at a cost of $34,834.81.
   The total cost of all work prosecuted with Emergency Relief funds
was $240,344.45.
   The total costs for the fiscal year were as follows:

                                                                             New work        Maintenance            Total

Regular funds ..____      .. _________________________                   -   $514, 333. 92   $1, 710, 370. 06   $2, 224, 703. 98
Emergency Relief funds -..............................
                                         _ _                             .    205, 509. 64        34, 834. 81       240, 344. 45

     Total.....   ...   ...   ...   ...   ....   ...   ...   ...   ...   -    719, 843. 56    1, 745, 204. 87    2, 465, 048.43



   The total expenditures were $2,450,192.51, of which $2,242,587.89
were regular funds and $207,604.62 were emergency relief funds.
   Condition at end of fiscal year.-The existing project was about
94 percent complete at the end of the fiscal year, based on the 1936
estimate of cost of new work. The physical extent of the work
accomplished is 1,582,884 linear feet of pile dikes, 883,973 linear feet
of revetment, 29,499 linear feet of abatis, 35,842 linear feet of re-
tards, 16,561 linear feet of levees, 5 revetment spillways, 115 linear
feet of dike screened, removal of 2,964 linear feet of dikes, and the
removal of 80,903,486 cubic yards of material by dredging. All
structures or portions of structures which have not yet accomplished
the purpose intended are in a good condition, as the decayed portions
of such structures are usually destroyed by high water or the annual
flow of ice, following which they are repaired according to the
exigencies of the work.
   Although the work accomplished has not resulted in the permanent
establishment of the project dimensions, it has made possible the
maintenance of the project width and a fairly stable project depth
throughout the navigation season, which approximately covers the
period from March 1 to December 1. Due to a period of high water,
the controlling depth at the end of the fiscal year exceeded the
project depth by approximately 4 feet.
994               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  This section of the river has been used for commercial navigation
since June 1935. During the periods of high water which usually
occur in April and June drafts of 8 feet or more are possible, but
the increased velocity of the current during these periods renders
impracticable drafts in excess of 5 feet for the type of equipment
normally used for navigation. Five feet is the practicable draft at
ordinary stages of the river.
   The work remaining to be done to complete the existing project
consists of the construction of additional dikes and revetment.

                                                                                 New work               Maintenance               Total


Regular funds_ --...       -------.                      .---.....-            $61,371,420.44 $13,315, 782.45                  $74,687, 202.89
Emergency Relief funds_.--  __---.. --.-..                  --- __.---     _     1, 375, 243. 49           133,756. 51           1, 509, 000. 00
Public Works funds___----______                                     -__-         5, 155,916. 94 ------....---------.........     5, 155, 916. 94
       Total-------....          ----------------------------                   67, 902, 580. 87         13, 449, 538. 96       81, 352, 119. 83



   The total expenditures under the existing project to June 30, 1937,
were $82,372,892.27 ($74,440,195.22 regular funds, $6,423,697.05 Public
Works funds, and $1,509,000 Emergency Relief funds).
   For expenditures by local interests, see paragraph "Local Coopera-
tion."
   Proposed operations.-The balance unexpended ($541,668.95) from
regular funds and accounts receivable ($398.07) at the end of the
fiscal year, together with allotments from regular funds totaling
$1,494,000 made in July 1937, will be applied as follows:

                                                                                                             Estimated         Kansas City
                                                                                                            date of com-        to mouth
                                                                                                              pletion


Accounts payable June 30. 1937..--------------------------------___                      -----------------              $247.405. 74
New work (channel contraction and bank protection work by dike and re-
  vetment construction) July 1, 1937, to June 30, 1938:
    By contract:
       Completion of existing contracts:
           Sheeps Nose and Berlin Bends dikes and revetment ..----------                        June 30, 1938             62, 000. 79
           Wilhoite Bend dikes and revetment             ......
                                                             ___ ___                                   -----
                                                                                                      do------......--.  105, 200. 46
       Proposed contracts:
           Liberty Bend revetment             _----------------------------------do--------........                       20, 000.00
           Missouri City Bend dikes----------___-                           ___--_------do....--------                    50, 000.00
           Bakers Bend dikes and revetment _-----------------
                                                 ...                                     --     . do-----...              60,000.00
           Thomas Bend revetment--....___             - ___-_____-                ------            - do                  10, 000.00
           Wilhoite Bend revetment__________________     ...........                            Dec. 15,1937              25, 000. 00
           Providence Bend revetment__ .-.-------                  ______           -
                                                                                  ___-_         June 30, 1938             27, 500. 00
           Murrays Bend revetment_- __ --- ______________     ---             -.----            Dec. 1, 1937              40, 000. 00
           New Haven Reach revetment..               -____          -____-_______     ____ May 30, 1938                   25,000.00
           Marthasville Bend revetment--___                      -
                                                        -__ ______________._.
                                                                          ---                   June 30, 1938             65, 000. 00
           South Point Reach dikes___..._____..-----do------......--.                                                     37, 500. 00
           St. Albans Bend dikes and revetment................__........-----do------......--.                            25, 000. 00
   By hired labor:
       Wilhoite Bend revetment__---------                 ---.-.--.--.----            _         Sept. 15, 1937            50, 000. 00
       Unallocated surveys_.---_________-_________---------__                                   June 30, 1938             40, 000. 00

         Total new work------------------------------------------------------                                                      642, 201. 25
Maintenance (July 1, 1937, to June 30, 1938), by hired labor:
   Maintenance and repair of existing works                                           -----------------
                                                                     _________---------   __                       -               302, 460. 03
                                                                                                                              -__.....
   Snagging----            .........................---------------.....------------------------------......    ---------------     10,000.00
   Channel dredging----....................-----------------------------------------------------...............                    537,000.00
   Rock dredging ..................-------------------------------------------- ---------------                                    120, 000. 00
   Channel marking ...-------.................-----------------------------------..............---------------                     125,000. 00
   Channel surveys               ..............------------------------------------------...............-------------.              45,000.00
   Surveys, gages, and studies-------                            ------------------------------------------                          7, 000. 00
                          ................-------------------------
        Total maintenance---                                                                                                     1, 146, 460. 03
        Total for all work----               ------------------- ---........---------------.. 2, 036, 067.02
                          .....................-------------
             RIVERS AND HARBORS-KANSAS CITY, MO., DISTRICT                                                                               995
   The balance unexpended ($44,793.33) from funds provided by the
National Industrial Recovery Act of June 16, 1933, will be applied
to completion of existing contract for revetment work at Bonhomme
Bend. The additional sum of $2,350,000 can be profitably expended
during the fiscal year ending June 30, 1939, as follows:

                                                                                                               Estimated            Kansas
                                                                                                              date of com-          City to
                                                                                                                pletion             mouth

New work (channel contraction and bank-protection work by dike and revet-
ment construction) July 1, 1938, to June 30, 1939; by contract_--_ _..------------..---.____                                        $500,000
Maintenance:
   By hired labor:
                                                     ----------.-------- _
       Maintenance and repair of existing works...........                                  ...                                       560, 000
       Snagging.      ---------------------------------------------------------------                                                  50,000
        Dredging-_-__ ___                _.------------------------------------------------- --------------- 1,150, 000
        Channel surveys        --------------------------------------------------------                                                  50, 000
        Surveys, gages, and studies...................------------------------------------------------                                   40, 000
           Total maintenance....................................-------------------------------------      --------------- 1,850, 000
           Total for all work-----------............----------------------.........---------------.....                            2,350,000


                                            Cost and financial summary
                                   MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937-------------------------__ $68, 631, 523. 83
Cost of maintenance to June 30, 1937----------------------    13, 718,809. 54

      Total cost of permanent work to June 30, 1937-----------                                                        82, 350, 333. 37
Plus accounts receivable June 30, 1937---------------- --------                                                                398. 07
      Gross total costs to June 30, 1937   --
                                         _______---- _- - - 82, 350, 731. 44
Minus accounts payable June 30, 1937------------------------    247, 405. 74

     Net total expenditures--------------------------------                                                           82, 103, 325. 70
Unexpended balance June 30, 1937--------- ------------------                                                              541, 668. 95
         Total amount appropriated to June 30, 1937-------------82, 644, 994. 65


  Fiscal year ending                 1933                   1934                   1935                    1936                   1937
        June 30

Cost of new work _ ,__          $8, 350, 995. 71       $2, 177, 278. 95        $625, 246. 32         $357, 622. 63              $514, 333. 92
Cost of maintenance__               728, 057. 80           668, 093. 26         814, 479. 36        1, 520, 496. 80            1, 710, 370. 06
      Total cost --...-          9, 079, 053. 51        2, 845, 372. 21        1, 439, 725. 68      1, 878, 119. 43            2, 224, 703. 98
Total expended ..--------        9, 125, 180. 49        3, 870, 118. 18     -1, 139, 197. 43            1, 537, 860. 55        2, 242, 587. 89
Allotted--------------7, 874, 672. 44                   3, 342, 973. 24        -679, 292. 98        1, 321, 145. 07               904, 100. 00



Balance unexpended July 1, 1936_______       _                                                                       $1, 880, 156. 84
Amount allotted from War Department Appropria-
  tion Act approved Apr. 9, 1935_____$__________ $356, 100. 00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936----------------  548, 000. 00
                                                                                                                            904
                                                                                                                            Amount
                                                                                                                            784,
                                                                                                                                    100
                                                                                                                              tobeaccounted
                                                                                                                                             00
                                                                                                                                    256.for-2,


         Amount to be accounted for__                                          _ ____________                             2, 784, 256. 84
996                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Gross amount expended__________-_______--                                                   _ $2,297,319.16
Less reimbursements collected    -----    --                                                              54,731. 27
                                                                                                                            $2, 242, 587.            89
      Balance unexpended June 30, 1937___________________                                                                           541, 668. 95
Outstanding liabilities June 30, 1937 -------------- $206, 649. 26
Amount covered by uncompleted contracts--------       258, 000. 36
                                                                                                                                    464, 649. 62
      Balance available June 30, 1937________________________                                                                            77, 019. 33
Accounts receivable June 30, 1937____                                                                                                        398. 07
     Unobligated balance available June 30, 1937__                                                                                  77, 417. 40
Amount allotted during July 1937____    ________________                                                                         1,494, 000. 00
     Balance available for fiscal year 1938________________                                                                      1, 571, 417.40
Amounted (estimated) required to be appropriated for comple-
   tion of existing project 1 _______                                                                                            5, 000, 000.00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
       For new work 1                                   -                                       -               --                  500, 000. 00
       For maintenance 1                                                                                                         1, 850, 000. 00
                     ----- ---- -- -- -- ---
         Total       _                                           --                                                              2, 350, 000.00
     Exclusive of available funds.

                                                        PUBLIC           WORKS         FUNDS


Cost of new work to June 30, 1937                                               -                                           $5, 155, 916. 94
Cost of maintenance to June 30, 1937_

      Total cost of permanent work to June 30, 1937-                                                                             5, 155, 916. 94
Undistributed costs June 30, 1937_______________________                                                                         1, 267, 780. 11

          Net total cost to June 30, 1937 __________________                                                                     6, 423, 697.05

Net total           expenditures____________________                                                                             6, 423, 697. 05
Unexpended balance June 30, 1937                                                       --                                                44, 793. 33

          Total amount appropriated to June 30, 1937 ________                                                                    6, 468, 490.38


  Fiscal year ending                     1933                          1934                 1935                     1936                   1937
       June 30


Cost of new work ______ ______________                          $2, 843. 362. 11       $2, 206, 459. 05        $106, 095. 78                    --
Cost of maintenance .-                --------------        -         -------   ----   -----------         -    --      -   --    -----------

Total expended--                  .                         2, 908, 145. 32
                                                  ..------------------.                 3, 375, 456. 47          140, 095. 26
Allotted .......      .........                 ....             4, 960, 000. 00        1, 686, 000. 00        -177, 509. 62       ---               --




Balance unexpended July 1, 1936___________                                                                                           $44, 793.33
Balance unexpended June 30, 1937_______                                                                                               44, 793. 33
Amount covered by uncompleted contracts_                                                                                              44, 793. 33
                                                       EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937 ___________          ________                                                                  1, 375, 243.49
Cost of maintenance to June 30, 1937_______________________ -                                                                       133, 756. 51
      Total cost of permanent work to June 30, 1937___                                                                           1, 509, 000. 00
Net total expenditures--____------_________ _____ _                                                                              1, 509, 000. 00
Total amount appropriated to June 30, 1937_                                                                                         509, 000.00
                                                                                                                                 1,,______--------
                  RIVERS AND HARBORS-IKANSAS CITY, MO., DISTRICT                                                                                                  997

   Fiscal year ending                             1933                    1934                               1935                    1936
            June 30                                                                                                                                        1937


Cost of new work_---__-----------------____                                                  -   _.....      -___               $1, 169, 733. 85         $205, 509. 64
Cost of maintenance__ .-                         _ -______....._
                                                               _ ___                   ___....___
                                                                                     .___                     .....
                                                                                                                __--        .        98, 921.70             34, 834. 81
                   ......
         Total cost_------              ......             ...   ______                      _                   -----
                                                                                                              .........          1, 268, 655. 55           240, 344. 45
Total expended-------__---____-____.
                       .         ....                                                                                            1,301, 395. 38            207, 604. 62
Allotted-----___                       --...............           .      .      .      -.                  $1,684,000           -175,    000. 00 ..



Balance unexpended July 1, 1936___ _________________-------_                                                                                        $207, 604. 62
Gross amount expended________________________     $209, 624.96
Less reimbursements collected __________________     2, 020. 34
                                                                                                                                                       207, 604. 62

    CONSOLIDATED COST AND FINANCIAL SUMMARY,                                                                MISSOURI RIVER, KANSAS                      CITY TO
                                                                              MOUTH

Cost of new work to June 30, 1937_________________ _______$75, 162, 684. 26
Cost of maintenance to June 30, 1937 _______-_____________- 13, 852, 566. 05
      Total cost of permanent work to June 30, 1937_-                                                                                -____ 89, 015, 250. 31
Undistributed costs June 30, 1937____________-___---                                                                                        1, 267, 780. 11
      Net total cost to June 30, 1937 _______ __________-__ 90, 283, 030. 42
Plus accounts receivable June 30, 1937 ______-____-___--  __--       398. 07
     Gross total costs to June 30, 1937 _________________                                                                                      90, 283, 428. 49
Minus accounts payable June 30, 1937______________   _                                                                                             247, 405. 74
     Net total expenditures -____-_______________________                                                                                       90, 036, 022. 75
Unexpended balance June 30, 1937__________-- _____    ____                                                                                          586, 462. 28
             Total amount appropriated to June 30, 1937_______                                                                           -___ 90. 622. 485. 03

    Fiscal year ending                             1933                   1934                               1935                    1936
            June 30                                                                                                                                        1937


Cost of new work-.....                     $8, 350, 995. 71        $5, 020, 641. 06                  $2, 831, 705. 37           $1, 633, 452. 26          $719, 843. 56
Cost of maintenance..-                         728, 057. 80            668, 093. 26                      814, 479. 36            1, 619, 418. 50         1, 745, 204. 87
          Total cost-......                  9, 079, 053. 51           5, 688, 734. 32                    3, 646, 184. 73        3, 252, 870. 76         2, 465, 048. 43
Total expended--------                       9, 125, 180. 49           6, 778, 263. 50                    2, 236, 259. 04        2, 979, 351. 19         2, 450, 192. 51
Allotted---............----------...         7, 874, 672. 44           8, 302, 973. 24                    2, 690, 707. 02          968, 635. 45            904, 100. 00



Balance unexpended July 1, 1936-......________-__     ___     $2, 132, 554. 79
Amount allotted from War Department Appropria-
  tion Act approved Apr. 9, 1935--------------- $356, 100. 00
Amount allotted from War Department Appropri-
  ation Act approved May 15, 1936--------------548, 000. 00
                                                                  904,100. 00
      Amount to be accounted for_----------------_
                                             _-----                                                                                                3, 036, 654. 79
Gross amount expended __    _______--_-----$2,                                                                            506, 944. 12
Less reimbursements collected------------------                                                                            56, 751. 61
                                                                                                                                                   2, 450, 192. 51
      Balance unexpended June 30, 1937--------------------                                                                                             586, 462. 28
Outstanding liabilities June 30, 1937_______- $206, 649. 26
Amount covered by uncompleted contracts-------- 302, 793. 69
                                                                                                                                                       509, 442. 95

              Balance available June 30, 1937.___------------------                                                                                     77, 019. 33
998             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Accounts receivable June 30, 1937__---_____-- _____________---                                                     $398. 07

     Unobligated balance available June 30, 1937._---------                                                     77, 417. 40
Amount allotted during July 1937---1,---------------------                                                   1 494, 000. 00

          Balance available for fiscal year 1938----- ------------                                           1, 571, 417. 40

Amount (estimated) required to be appropriated for completion
of existing project 1__------------------ -------                                                           5,000, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1---------------------------------                                                              500, 000. 00
   For maintenance 1_____________--------------                                                              1, 850, 000. 00
                     1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
           Total                                                                                             2, 350, 000. 00
   1 Exclusive of available funds.

             2. MISSOURI RIVER, KANSAS CITY, MO., TO RULO, NEBR.

See report Kansas City to Sioux City, page 1005.
                                                3. OSAGE RIVER, MO.

  Location.-This river, rising in eastern Kansas, flows easterly
516 miles in sinuous bends to the Missouri River, 129 miles above its
mouth and 14 miles below Jefferson City.
  Existing project.-This provides for a lock and dam and for
open-channel work consisting of wing dams and training walls, re-
moval of obstructions, and dredging between the mouth and Warsaw,
a distance of 170 miles.
   The estimate of cost of new work, revised in 1928, was $250,000,
exclusive of lock and dam no. 1, for open-channel work as far as
Niangua River. The latest (1936) approved estimate of cost for
annual maintenance is $18,500, including $6,000 for operating and
care of the lock and dam. Actual operations are being confined to
the section below the Bagnell Dam (mile 75.4) to obtain a channel
80 feet wide and 3 feet deep at low water. Ordinary and extreme
fluctuations are 15 and 41 feet. The following table shows the prin-
cipal features of the lock and dam included in the project:
                                       Lock and dam no. 1, Osage River

Nearest railroad station ___                        ___________-_____                          Osage City, Mo., 6 miles.
Distance above mouth of river                                                                       miles.
                                                                                               7--------------------.4
Lock dimensions ------- ______-- __------                                    _____             42 by 220 feet.
Lift of lock________________________________--                                                 16 feet.
Depth on lower miter sill at low water-----------                                              9 feet.
Character of foundation ________-________---_                                                  Piles in gravel.
Kind of dam ----------------------------------                                                   ixed with movable crest.'
Type of construction_____ __---____----Concrete.
Year completed -------------------------------                                                 Lock, 1906; dam, 1911.
                                                                                    - -
Cost - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - -            $468,419.98.
  19-foot fixed dam of concrete with 7-foot movable crest of chanoine wickets                                           and
Chittenden drum weirs.
   2
   Exclusive of $260,171.72, cost of reconstruction and repairs.
  The project was adopted by the River and Harbor Act of March 3,
1871 (H. Doc. No. 60, 41st Cong., 3d sess.; Annual Report for 1871, p.
       RIVERS AND HARBORS--KANSAS         CITY, MO., DISTRICT      999
327), which provided for deepening the channel over the shoals by
dredging as far as Roscoe, 238.5 miles above the mouth. It was modi-
fied by the following river and harbor acts: The act of September 19,
1890, provided for commencement of construction of a lock and dam;
act of March 3, 1899, provided for a lock and dam (Annual Report
for 1898, p. 3474); act of June 24, 1902, declared the river nonnavi-
gable above the dividing line between Benton and St. Clair Counties,
Mo., 185 miles; and the act of March 4, 1904, provided for the con-
struction of a power dam without lock at Warsaw, Mo., 172 miles
above the mouth, the act of January 14, 1901, having authorized
the construction of the dam. Operation and care of the lock and
dam were included in the project July 1, 1935, under the provisions
of the Permanent Appropriations Repeal Act of June 26, 1934. For
latest published map see Annual Report for 1911, page 2012.
   Terminal facilities.-On the Lake of the Ozarks, which was formed
by Bagnell Dam, a privately constructed and operated power struc-
ture on the Osage River at mile 75.4, there are numerous private
facilities which adequately fulfill existing needs.
   Operations and results during fiscal year-Maintenance.-Work
consisted of the operation and care of the lock and dam. There were
69 lockages for 74 pieces of small craft which passed through the
lock. The total costs were $4,759.12, and the total expenditures were
$5,208.08.
   Condition at end of fiscal year.-The lock under the existing project
was completed in 1906, and the dam was completed in 1911. The
latter, however, partially failed, and the reconstruction work was
not completed until 1914. The open-channel work was essentially
completed in 1919. The works accomplished under this project are
deteriorating and will need repair within the next few years. While
the lock machinery does not function perfectly, it is considered that
the lock operates sufficiently well for the accommodation of the lim-
ited amount of traffic now passing it.
   The project affords a fairly dependable channel depth of 3 feet
during low water from the mouth of the river to mile 21, or 14 miles
above the dam, and drafts of 2 feet over this section are practicable.
The section from mile 21 to the Bagnell Dam (75.4 miles above the
mouth) has no dependable channel, and drafts in excess of 18 inches
are not practicable. On the Lake of the Ozarks, formed by the
Bagnell Dam, drafts of 10 feet are practicable at average lake stages
up to approximately 165 miles above the mouth, above which point
the Osage River was declared not to be a navigable stream by the
act of Congress approved March 4, 1904.
   The total cost of the existing project to June 30, 1937, was $1,211,-
873.93 from regular funds, of which $658,075.71 was for new work,
$543,847.22 was for maintenance, and $9,951 was for operation and
care of the lock and dam. The total expenditures were $1,211,903.93
from regular funds. In addition, the sum of $190,561.10 was expended
between July 1, 1912, and June 30, 1935, on the operation and care of
the works of improvement, under the provision of the permanent
indefinite appropriation for such purposes.
1000               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposedoperations.--The unexpended balance ($19) and accounts
receivable ($30), together with an allotment of $5,000 made in July
1937 from regular funds, will be expended as follows:
Operation          -----------------------------------------            $4, 850
Ordinary maintenance and repair (less rental) -------------------------      89
Special work (repair of floating plant) -------------------------------      60
Emergencies--------------------- ------------------------------------        50
            Total for all work                      ---------------------------------------5, 049
  The additional sum of $5,000 will be required to maintain and
operate the lock and dam during the fiscal year 1939 as follows:
Operation of lock and dam________________----------------------------------------- $4, 650
Ordinary maintenance and repair (less rental) -----------------------                   50
Special work-----------           ----------------------------------                   200
Emergencies---------------------------------------------------------100
            Total for all work---------------------------------------------5, 000

                                               Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                             $658, 075. 71
Cost of maintenance to June 30, 1937----------------------------                                            744, 359. 32
      Total cost of permanent work to June 30, 1937----------                                           1, 402, 435. 03
Plus accounts receivable June 30, 1937---------------------                                                      30. 00
            Net total expenditures ---------------------------------                                    1, 402, 465. 03
Unexpended balance June 30, 1937                                    _____________________                         19. 00

             Total amount appropriated to June 30, 1937____________--                                  11, 402, 484.03


     Fiscal year ending June 30                      1933           1934          1935          1936             1937

Cost of new w ork-.. .. .. . .. .. .-.. .. . .. .. . .. .. . .. .. . .. .. . .. .. . .. .. . .. .. . .. .. .
                                    -    -

Cost of maintenance.-----------                    $6, 786. 18     $4, 045. 66   $4, 349. 67   $5,191.88        $4, 759. 12

Total expended             ---------------..................
                                                     5, 133. 40     3, 419. 43    4, 383. 27    4, 772. 92       5, 208. 08
Allotted ---------------------                      5, 909. 09    -5, 606. 91    10, 700. 00    2, 651. 45-------------



Balance unexpended July 1, 1936 -------------------------                                                    $5, 227. 08
Gross amount expended _____-                                                                                  5, 208. 08

      Balance unexpended June 30, 1937_                                                                           19. 00
Outstanding liabilities June 30, 1937_                                                                            19.00
            Balance available June 30, 1937___                                                                      .00
Accounts receivable June 30, 1937 -- ________________________                                                     30. 00

     Unobligated balance available June 30, 1937______________                                                    30. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937__________________________________                                                     5,000.00
       Balance availabe for fiscal year 1938___-----   -__    ---            5, 030. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 2______________            __       _        5, 000. 00
1 Includes $190,561.10 for operation and care from permanent indefinite appropriation.
    2 Exclusive of available funds.
                   RIVERS AND HARBORS-KANSAS                                                    CITY, MO., DISTRICT                      1001
      4. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                    (GENERAL)
  The cost of work during the year was $211,850.17, and the total ex-
penditures were $211,873.56, including an expenditure of -$2,645.43
made by the Missouri River division from a monthly revolving fund
for division operations. The balance unexpended, including accounts
receivable, is $87,082.61 as of June 30, 1937. This amount, plus an
allotment of $10,000 made in July 1937, will be applied as needed
during the fiscal year 1938 to payment of expenses to be incurred
under this heading. The additional sum of $30,000 can be profitably
expended during the fiscal year ending June 30, 1939.
                                                        Cost and financial summary
Cost of new work to June 30, 1937-
Cost of maintenance to June 30, 1937-----------------------                                                                     $666, 070. 29
      Total cost of permanent work to June 30, 1937------------                                                                     666,070. 29
Undistributed costs June 30, 1937                                                                                                    35, 288. 26
      Net total cost to June 30, 1937 --  -------        ___     701, 358. 55
Plus accounts receivable June 30, 1937--------------------------      789. 79
      Gross total costs to June 30, 1937_ ---              _                                                         _              702, 148. 34
Minus accounts payable June 30, 1937     ---------------------                                                                        4,489. 82
             Net total expenditures_                                    --           --------                  _         _          697,658. 52
Unexpended balance June 30, 1937_                                                                                                    86, 292. 82
             Total amount appropriated to June 30, 1937---------------                                                              783, 951. 34

             Fiscal year ending June 30                                  1933            1934           1935             1936            1937


Cost ofnew work .....        ---------
                             .---
Cost of maintenance-----------....-------..                              524. 43
                                                                      $34,           $96, 522. 31   $26, 763. 88   $78, 372. 57       $211, 850. 17
Total expended ....-----------------------.                           34, 994.96     126, 027. 72    35, 018. 75    72, 000. 23        211, 873. 56
Allotted ..............................----------------------------   115, 003. 64    89, 207. 70    31, 300. 00   265, 240. 00         64, 200. 00


Balance unexended July 1, 1936--------------------------- $233, 966. 38
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936------------------------------------    64, 200. 00
      Amount to be accounted for -------------------       __     _                                                                 298, 166. 38
Gross amount expended---    ---------------------     $652, 018. 98
Less:
    Reimbursements collected---------$439, 875. 37
    Receipts from sales----------------       270. 05
                                                       440, 145. 42
                                                                                                                                    211, 873. 56
      Balance unexpended June 30, 1937------------------------                                                                       86,292. 82
Outstanding liabilities June 30, 1937--------------------------                                                                      16,049. 85
     Balance available June 30, 1937---            ------------                                                                      70, 242.97
Accounts receivable June 30, 1937--- -------------------------                                                                           789. 79
     Unobligated balance available June 30, 1937--------------                                                                       71, 032. 76
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------                                                                           10, 000. 00
      Balance available for fiscal year 1938 -------    -                                                                           81,032. 76
Amount that can be profitably expended in fiscal year ending June
                               1-  - -                - - - - -                                                                 -
30, 1939, for maintenance                                                                                                          30, 000. 00
1
   Exclusive of available funds.
1002         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

5. OTHER PROJECTS FOR WHICH                                NO ESTIMATES              ARE SUBMITTED
            [Commercial statistics for these projects are given in pt. 2 of report]

                                                      For last     Cost and expenditures to
                                                      full re-           June 30, 1937                 Estimated
                 Name of project                      port see                                         amount re-
                                                      annual                                            quired to
                                                       report      New work          Mainte-            complete
                                                        for-                         nance

1. Gasconade River, Mo.1 2_     _____1931                          $139, 003. 21     $85, 076, 57          (3)

  1 Present conditions adequate for existing needs.
  2 Curtailment of project recommended in H. Doc. No. 467, 69th Cong., 1st sess.
  3 Maintenance only.

        6. PLANT ALLOTMENT FOR KANSAS CITY, MO., DISTRICT

                                    Cost and financial summary
Undistributed costs June 30, 1937____________________________ $2, 646, 696. 88
Plus accounts receivable June 30, 1937________________________    172, 712. 04
        Gross total costs to June 30, 1937_________________                                    2, 819, 408. 92
Minus accounts payable June 30, 1937-                             ---------                          245, 555. 58

     Net total expenditures_ _- _    --                                                        2, 573, 853. 34
Unexpended balance June 30, 1937 _---------                                                      230, 074. 04

        Total amount appropriated to June 30, 1937_____________                                2, 803, 927. 38


   Fiscal year ending June 30               1933       1934            1935            1936                1937


                                       _
Total expended------........ .___.._________ _____    __________$2, 561, 689. 14     $87, 321.01       -$75, 156. 81
Allotted_....................       ..-     .         -_          2, 806, 503 58     450, 382. 40      -452, 958. 60


Balance unexpended July 1, 1936__ ___________-----------$607, 875. 83
Deductions on account of revocation of allotment -------------- 452, 958. 60

        Net amount to be accounted for___                           --------------
                                                                   ___-----                          154, 917. 23
Gross amount         expended___________                      _____$3,287,298.44
Less-
    Reimbursements            collected .....      $3, 334, 119. 95
     Receipts from sales_                              28, 335. 30
                                                                        3, 362, 455. 25
                                                                                                    -75,   156. 81
      Balance unexpended June 30, 1937 -------               ____                                    230, 074. 04
Outstanding liabilities June 30, 1937 ______________--_________                                      399, 211. 33
        Balance available June 30, 1937--                     _____---__                __     -- 169, 137. 29
Accounts receivable June 30, 1937------------------------------                                      172, 712. 04
        Unobligated balance available June 30, 1937 .---- __-__                                        3, 574. 75

7. KANSAS CITIES ON MISSOURI AND KANSAS RIVERS, MO., AND KANS.,
                        FLOOD CONTROL

  Location.-Kansas Cities on Missouri and Kansas Rivers in Mis-
souri and Kansas.
        RIVERS AND HARBORS-KANSAS           CITY, MO., DISTRICT      1003
  Existing project.-The Flood Control Act approved June 22, 1936,
authorized flood-control work for the protection of Kansas Citys by
the following items contained in the act:
  Levees and flood walls to protect people and city property; in accordance
with plans approved by the Chief of Engineers on recommendation of the
Board of Engineers for Rivers and Harbors and as amended by further sur-
veys and studies now in progress at an estimated construction cost not to
exceed $10,000,000; estimated cost of lands and damages, $8,000,000.
   A definite project to accomplish the above work was submitted
by the district engineer on October 31, 1936. The estimated con-
struction cost of this project was in excess of the authorization of
the Flood Control Act.
   A partial project submitted at the same time, which fell within
the authorization of the Flood Control Act, would provide com-
plete protection for two industrial districts having the highest prop-
erty valuation.
   This whole question has subsequently been studied in connection
with the preliminary examination and survey report authorized
by the Flood Control Act of 1936. In that report a plan is pre-
sented also for supplemental local protection works, in combination
with a reservoir system to provide protection equivalent to that of
local protection by high levees.
   Local cooperation.-See page 6. Local interests do not wish to
make a definite commitment regarding local cooperation until
further studies for protection by a reservoir system are completed.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operation.-No funds have been allotted to date. Work
can be started immediately after funds have been allotted and the-
final construction plans have been completed.
      8. KANSAS    RIVER AT     TOPEKA, KANS.,    FLOOD    CONTROL

   Location.-This project is located on the right and left banks of
the Kansas River at Topeka, Kans.
   Existing project.-This provides for the protection from flood
damage of the people and property of the city of Topeka, Kans., bhy
the construction of additional levees to protect North Topeka and
the flooded areas adjacent to the south bank of the Kansas River,
the raising and extending of existing levees, the construction of a
flood wall around the city waterworks, and the enlargement of the:
floodway capacity of existing bridges.
   The existing project was adopted by the Flood Control Act ap-
proved June 22, 1936 (H. Doc. No. 195, 73d Cong., 2d sess.), accord-
ing to prior estimates of $845,300 for construction costs, and $806,500
for lands and damages. A revised cost estimate for a definite proj-
ect to accomplish the above work, which was submitted by the dis-
trict engineer on October 27, 1936, was $2,736,480 for cynstruction
costs and $609,720 for lands and damages.
   The estimated cost of a partial project is $960,900 for construction
cost and $1,493,400 for lands and damages. This project would
provide levees of reduced height for North Topeka and partial
protection to property on the south bank of the Kansas River. N
provision is made in the partial plan for bridge alterations. The
1004          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

partial project has been accepted by the Chief of Engineers as the
definite project in fulfillment of the Flood Control Act.
   Local cooperation.-See page 6. Local cooperation is assured.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operations.-An allotment totaling $1,000,000 ($600,000
regular funds and $400,000 Emergency Relief funds) made during
the fiscal year ending June 30, 1938, will be applied to the construc-
tion of levees, retaining walls, floodgates, and appurtenant features.
         9. KANSAS RIVER AT LAWRENCE, KANS., FLOOD CONTROL

   Location.-This project is located on the left bank of the Kansas
River at Lawrence, Kans.
   Existing project.-This provides for the protection from flood
damage of the people and property of the city of Lawrence, Kans.,
by the construction of approximately 3.83 miles of levee completely
encircling the municipal area of north Lawrence.
   The existing project was adopted by the Flood Control Act ap-
proved June 22, 1936 (H. Doc. No. 195, 73d Cong., 2d sess.), accord-
ing to prior cost estimates of $163,100 for construction work and
$118,100 for lands and damages.
   The estimated cost of a partial project falling within the authori-
zation of the Flood Control Act is $163,100 for construction work
and $63,720 for lands and damages. The partial project provides
levees of lower height and eliminates the pumping plant and flood-
gates provided in the plan for full protection. The partial project
has been accepted by the Chief of Engineers as the definite project
in fulfillment of the Flood Control Act.
   The estimated cost of a definite project submitted by the district
engineer on October 24, 1936, was $303,480 for construction, and
$115,500 for lands and damages.
   Local cooperation.-See page 6. Local cooperation does not ap-
pear likely at this time.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operations.-No funds have been allotted to date. Work
can be started immediately after funds are allotted, when local co-
operation is assured and when final construction plans have been
completed.
.Status of reports called for by river and harbor acts and committee resolutions

                                                    Date trans-Recommenda-
         Locality             Authorization act     mitted to       Document no.   tiRecommenda-
                                                     Congress                      tion

Big Blue River and trib-     Flood   Control Act,
  utaries   (preliminary      June 4, 1936.
examination for flood
control).
Kansas River and tribu-      Flood Control Com-
taries (flood ctintrol).      mittee resolution,
                              Apr. 2, 1936.
Marais      des     Cygnes   Flood   Control Act, ...
  River, Kans. (prelim-       May 6, 1936.
inary examination for
flood control).
Republican River,            Flood Control Act, .....
  Smoky Hill River, and      Apr. 10, 1936.
  minor tributaries of
  Kansas River (prelim-
  inary examination for
  flood control).
             RIVERS AND HARBORS-OMAHA,                  NEBR., DISTRICT           1005
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
           OMAHA, NEBR., DISTRICT
   The improvement of the Missouri River and its tributaries from
Rulo, Nebr. (about mile 514.8 1) to the mouth of the Yellowstone
River (about mile 1,690 2) is under the jurisdiction of the Omaha,
Nebr., district.
   The improvement of that section of the Missouri River from Rulo,
Nebr., to Kansas City, Mo. (Quindaro Bend), is under the jurisdic-
tion of the Kansas City, Mo., district.
   District engineer: Capt. Herbert B. Loper, Corps of Engineers.
   Division engineer: Col. R. C. Moore, Corps of Engineers.
                                      IMPROVEMENTS

                                        Page                                        Page
1. Missouri River, Kansas City,             4. Plant allotment-------------1018
     Mo., to Sioux City, Iowa__        1005 5. Missouri    River,     Niobrara,
2. Missouri River, Sioux City,                   Nebr., flood control------- 1018
     Iowa,   to Fort Benton,                6. Missouri River Basin flood
     Mont_ -------------      _        1015      control_    ____ _-- -1019
3. Examinations, surveys, and
     contingencies (general)    ---     1017

   1. MISSOURI RIVER, KANSAS CITY, MO., TO SIOUX CITY, IOWA

  Location.-The Jefferson, Madison, and Gallatin Rivers conjoin at
Three Forks, Mont., to form the Missouri River, which flows south-
easterly 2,473 miles across or along seven States to the Mississippi
River, 17 miles above St. Louis.
  The river is the boundary between the States of Missouri, Kansas,
Nebraska, and Iowa. For description see page 1149, Annual Report
for 1932.
  Previous projects.-Under the River and Harbor Act of August 14,
1876, the first regulation works were constructed at St. Joseph and
Nebraska City, but a project for systematic river improvement was
not adopted until August 2, 1882, modified by the River and Harbor
Acts of July 5, 1884, September 19, 1890, and June 13, 1902. The
costs and expenditures up to but not including the allotment from
the War Department Appropriation Act of March 23, 1928, were
$2,586,616.56 for new work and $570,203.93 for maintenance, a total
of $3,156,820.49. For further details see page 1893, Annual Report
for 1915.
  Existing project.-This provides for securing a permanent navi-
gable channel 6 feet in depth and to conform to the character and
methods of improvement of the section of river between the upper
end of Quindaro Bend and the mouth, namely, by means of bank
revetment, permeable dikes to contract and stabilize the waterway,
removal of snags, and occasional dredging. Length of section under
improvement (upper end of Quindaro Bend to Sioux City) is 409
miles (1890 mileage). The ordinary fluctuation is about 14 feet and
the extreme fluctuation about 38 feet.
  1All   mileage is 1932 channel mileage above the mouth unless otherwise designated.
  2 1890 channel mileage.
1006    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimated cost of new work, revised in 1935, exclusive of
amounts expended on previous projects, is $92,000,000. The estimated
cost of annual maintenance is $2,500,000.
   The existing project was adopted by the River and Harbor Act of
January 21, 1927 (H. Doc. No. 1120, 60th Cong., 2d sess.), which
authorized the appropriation of $12,000,000 for the prosecution of
this project, and the River and Harbor Act approved July 3, 1930,
authorized the additional appropriation of $15,000,000, or a total of
$27,000,000. Additional allotments totaling $29,153,108 were made
by the Public Works Administration under the provisions of the
National Industrial Recovery Act of June 16, 1933, and an allotment
of $9,675,000 was made under the provisions of the Emergency Relief
Appropriation Act of April 8, 1935. Completion of the project from
mouth to Sioux City, Iowa, was authorized by the River and Harbor
Act approved August 30, 1935 (H. Doc. No. 238, 73d Cong., 2d sess.).
   Local cooperation.-None required.
   Terminal facilities.-The private facilities for loading grain onto
barges at Leavenworth, Kans., consisting of a belt conveyor con-
necting with an elevator, are being reconstructed after having been
almost entirely destroyed by fire on July 28, 1936. It is considered
that these facilities will be adequate for existing commerce when
reconstruction is completed.
   Work of constructing a dock at Plattsmouth, Nebr., was begun
June 15, 1937, and all foundation piles have been driven. Estimated
cost of the dock is $23,760; $1,647.98 has been expended to date.
    Operations and results during fiscal year.-New work completed
during the year with Government funds consisted of 333 dikes, total-
ing 253,188 linear feet (40 dikes totaling 34,885 linear feet with
Public Works funds, 32 dikes totaling 44,778 linear feet with Emer-
gency Relief funds, and 261 dikes totaling 173,525 linear feet with
regular funds); 38 abatis totaling 44,082 linear feet (1 abatis 875
linear feet long with Public Works funds, 1 abatis 457 linear feet long
with Emergency Relief funds, and 36 abatis totaling 42,750 linear feet
with regular funds); 30 lengths of revetment totaling 49,380 linear
feet (6 lengths totaling 9,096 linear feet with Public Works funds,
2 lengths totaling 5,467 linear feet with Emergency Relief funds,
and 22 lengths totaling 34,817 linear feet with regular funds); 1 im-
permeable earth fill, 1,888 linear feet, constructed to effect a chute
closure at cost of $24,726.52; and construction of 8 lengths of tem-
porary bank protection, totaling 6,098 linear feet (Public Works
funds). In addition to completed works there are, in progress of
construction under contract and by hired labor, 300 dikes to total
about 370,000 linear feet, 50 abatis to total about 42,000 linear feet,
and 35 lengths of revetment to total about 200,000 linear feet. Main-
tenance consisted of repair to 6,581 linear feet of dikes and 14,358
linear feet of revetment; and minor repairs to other dikes and revet-
ment as required; removal of six piles, one loading dock, a section of
one crib dike, and one wreck. Snagging operations resulted in re-
moval of 790 snags; removing 4,356 trees from river bank; clearing
259 acres of brush; and removing, by blasting, eight gumbo points.
Dredging operations during the year by the U. S. dredges Robert
McGregor and William M. Black, and a Government dragline, re-
sulted in the removal of 322,743 cubic yards from 2 localities at a
         RIVERS AND HARBORS-OMAHA.           NEBR., DISTRICT        1007
total cost of $39,029.63 charged to new work and 1,954,526 cubic
yards from 11 localities at a total cost of $28,115.03, charged to main-
tenance. Unallocated surveys amounting to $166,464.04 ($71,498.51
Public Works funds, $16,434.30 Emergency Relief funds, and $78,-
531.23 regular funds) were made during the year and charged to new
work. The cost of channel surveys made during the year to deter-
mine results accomplished by the various works was $16,554.08; the
cost of stream gaging was $751.57; and the cost of channel marking
was $559.62, all charged to maintenance.
   The cost of new work was $7,903,671.73 ($1,299,818.22 Public
Works funds, $1,320,844.38 Emergency Relief funds, and $5,283,009.13
regular funds), and the cost of maintenance was $248,256.18 ($27,-
546.51 Public Works funds and $220,709.67 regular funds). Total
cost for the year was $8,151,927.91. The total expenditures for the
fiscal year amounted to $8,860,966.18; including $2,029,586.53 Public
Works funds, $1,261,860.77 Emergency Relief funds, and $5,569,518.88
regular funds.
   Condition at end of fiscal year.--The work between Kansas City,
Mo., and Rulo, Nebr., is approximately 90 percent completed. The
entire project is approximately 75 percent completed.
   All structures or portions of structures which have not yet accom-
plished the purpose intended are in good condition, as the decayed
portions of such structures are usually destroyed by high water or
the annual flow of ice, following which they are repaired according
to the exigencies of the work.
    Although the construction of new work is still in progress and
the improvements already installed have not, as a whole, fully accom-
plished the purpose intended, a channel of the project dimensions
is available with the aid of dredging as far as St. Joseph, Mo., and
at higher stages as far as Rulo, Nebr. Due to a period of high water,
the controlling depth at the end of the fiscal year (Kansas City to
Rulo) exceeded the project depth by approximately 3 feet.
    Towboats and launches operated by the Government and con-
tractors in connection with improvement works navigated this sec-
tion of the river during the fiscal year. Scheduled trips of boats
were not made over the entire section, but were confined mostly to
localities in which certain works were in progress. During periods
of high water, which usually occur in April and June, drafts of 6
feet or more are possible, but the increased velocity of the current
during these periods renders impracticable drafts in excess of 4 feet
for the types of equipment normally used. Four feet is the practi-
cable draft at ordinary stages of the river. Above Rulo, Nebr., and
to Omaha a marked improvement is shown, and except for several
limited sections the river is practically stabilized. Work now under
construction will insure early completion of this section. Above
Omaha to Sioux City the channel is approaching stabilization; the
major portion of the remaining work is to be accomplished in this
section.
    Under the existing project, beginning with the allotment from
War Department Appropriation Act of March 23, 1928, for syste-
matic work on the 6-foot channel, the work accomplished includes
330,044 linear feet of revetment for permanently fixing the banks,
1,429,800 linear feet of pile dikes, 109,575 linear feet of abatis, 2,287
      20196-37-pt. 1-64
1008          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

linear feet of jetties, recrowning 700 linear feet of an existing levee,
19,218 linear feet of retards for stabilization of channel widths, and
the removal of 16,470,390 cubic yards of material dredged from the
channel to obtain project depths.
   The total cost of work under the existing project is $53,709,367.32
of which $52,647,453.86 ($19,284,791.97 regular funds, $26,113,463.34
Public works funds, and $7,249,198.55 Emergency Relief funds) is
for new work and $1,061,913.46 ($897,207.02 regular funds, $108,-
061.79 Public Works funds, and $56,644.65 Emergency Relief funds)
is for maintenance. The expenditures are $52,871,748.87 ($20,263,-
304.58 regular funds, $25,584,317.37 Public Works funds, and $7,024,-
126.92 Emergency Relief funds).
   Proposed operations.-The unexpended balance ($3,127,028.46) and
accounts receivable ($21,698.19) at the end of the year, together
with allotments totaling $7,136,000, made during July 1937, will be
applied as follows:

                                                          Estimated         Kansas City Rulo, Nebr.,                         Kansas City
                                                         date of com-         to Rule,    to Sioux                            to Sioux
                                                           pletion              Nebr.       City                                City

Accounts payable....----------------------------                                $11, 447. 70             $624, 527. 59            $635, 975. 29
                                                                                                    I                    i

New work (channel contraction and bank pro-
  tection by dike and revetment construction)
Completion of existing contracts:
   Monona to Tieville Bends, inclusive,
     dikes, revetment, and abatis.....                 .. June 30, 1938                                   360, 877. 90
   Black Bird to Decatur Bends, inclusive,
     dikes, revetmeLt, and abatis---- ,___ --              Nov. 30,1937                                   128,000.00
   Decatur Bend to Louisville Bend, inclu-
     sive, dikes, revetment, and abatis...--               May 31,1938                                    340, 000. 00
   Louisville and Blencoe Bends, dikes, re-
     vetment, and abatis-..................                Nov. 30, 1937                                  260, 000. 00
   Little Sioux Reach and Bend, dikes and
     revetment....-----                 ------------- Dec. 31,1937                                        211,000.00
   Little Sioux to Soldier Bends, inclusive,
     dikes, revetment, and abatis..-----..                ... do ------
                                                                                     -------
                                                                                     --
                                                                                    --                    146,000.00
   Sandy Point to California Bends, inclu-                                 -------------
     sive, dikes, revetment, and abatis.....-- Nov. 30, 1937                                              212,000.00
   California and Blair Bends, dikes, revet-
     ment, and abatis.....----                            June 30,1938     ------      -   --   -
                                                                                                           76,000.00
   Calhoun to Rockport Bends, inclusive,
     dikes, revetment, and abatis.... ....... May 31,1938                                                 150, 000. 00
   Rockport to Florence Bends, inclusive,
     dikes and revetment-_------------------              June 30,1938                                       000. 00
                                                                                                          254,
   Papillion and Plattsmouth Bends, dikes
     and revetment........................--------------  Nov. 30, 1937                                   124, 000.00
   Hamburg Bend, dikes and abatis_.....---                 Oct. 31,1937                                   192,000.00
   Morgan to Indian Cave Bends, inclusive,
     dikes and revetment.................---------------   -_. do ...---                                  158,000. 00
      Total existing contracts- ----------------      ..............                                    2, 611, 877.90           2, 611,877.90
Proposed contracts:
    Floyd Bend, dikes-_.    ------             --  June 30,1938                                           210, 000.00
    Dakota-Omadi Bends, dikes and abatis___           .. do - . .                                         530,000.00
    Omadi-Browers Bends, dikes and abatis _           ..do_-                                              544,926.13
    Browers-Glovers Point Bends, dikes, re-
      vetment, and abatis ....                         _do_- ---                                          370,000.00
    Snyder-Wirnebago Bends, dikes and
      abatis-- -- -------------- .. .. .. .. .      -    do      - -           ---                        375,000.00
    Glovers Point-Omaha Mission Bends,
      dikes and abatis---- -------------------     -     do_                                              420,000.00
    Omaha Mission-Monona Bends, dikes
                  .. . .. . .. . .. . .. . .. .
      and abatis------                                                                                    290,000.00
    Monona-Black Bird Bends, dikes, revet-
     m ent, and abatis---- -------------------           do-------                                        505,000.00
    Decatur Reach-Louisville Bend, dikes -_            __do_-                                             350,174. 07
    Little Sioux Reach-Bullard Bend, dikes,
     revetment, and abatis_        --------------      __do _......
                                                                                                          405, 073. 87
    Harrison-Boyer Bends, dikes, revetment,
     and abatis.....----------.--------------     . -...            --
                                                         do -.....--.-----                                303, 568. 38
    Calhoun-Pigeon Creek Bends, dikes, and
     abatis...........---------------_.                         d          -do--..-                       244, 257.55        .          .
                  RIVERS AND HARBORS-OMAHA, NEBR., DISTRICT                                                                            1009

                                                                   Estimated         Kansas City Rulo, Nebr., Kansas City
                                                                  date of com-        to Rule,     to Sioux     to Sioux
                                                                    pletion             Nebr.        City         City

Proposed contracts-Continued.
   Kansas-Nishnabotna Bends, dikes, and
     revetment-----------------------------                   June 30, 1938                 $220, 000. 00
    Rock removal, Gibson Bend--............-------            Dec. 31,1937                    50, 000. 00  -------------
    Emergency construction              __    ..   ..--------June   30,1938                  450, 000. 00
    Rulo Bend to White Cloud Bend, dikes,
      and revetment__------------------ ....do........ $142, 000. 00
    Forbes Bend and Mount Vernon Bend,                            do----.....---             -....
      dikes, and revetment--------.....             .-----                   137, 500.00
    Belmont Bend, revetment                       ----- ...do....----- 20,000. 00
    Palermo Bend, dikes__..                   _          . May 15,1938         48, 000. 00
    Rushville Bend to Bee Creek Bend, re-
      vetment------_-----------------                         June 30,1938     81, 250. 00
    Delaware Bend to Little Platte Bend,
      dikes, and revetment ........__........                 May 30,1938     132, 000. 00           _                        -
    Leavenworth Reach, dikes_____________ June 30, 1938                        79, 500. 00 -
    Pope Bend, dikes_______________                           June 1,1938      34,750.00 - ... . .. -........       ....
Special work to expedite completion of project
  by contract):
    Tobacco Bend, earth fill by leased dredge- Nov. 30, 1937                                  $20,000.  00        ..-
    Bartlett Bend, earth fill by leased dredge_-                n do _....                     50,000.00 ------ -
    Bartlett Bend, dredged cut by leased
      dredge_-------------a-,r
                           d      tb-------------             J   do .--       ........  ... 40,000.00     ............
    Arago Bend, dredged cut by leased dredge. June 1,1938                                      60,o000..0                     ------......
       Total proposed contracts_____--.............----I______.............               000.00 5, 438, 000. 00
                                                                                       675,                                       6, 113, 000. 00
Proposed work by hired labor:
   Bullard to Sandy Point Bends, inclusive,
      dikes, revetment, and abatis .......... June                        30,1938                                000.00 ..............
                                                                                                              325,
    Cottier to Rule Bends, inclusive, dikes,
      revetment, and abatis-------      -------  Sept.                    30,1937                  85, 000. 00 ..
                                                                                        .......-----
    Bank blasting and clearing at strategic
      points......-------------.--..--_    _.    June                     30,1938        ........              10,000. 00 ...........
    Civil Bend, construction of impermeable
      rock and brush fill to close auxiliary
      chute...... . _ _ _..... __ ____ _         Sept.                    30, 1937                             25, 000.00     -------------
    Unallocated surveys.______ ______....     _. June                     30,1938        35,000.00             20, 000. 00 ............
    Iatan to Little Platte Bends, revetment..- Oct.                       31,1937        40,000.00
        Total for hired labor._-----------                     -------------               000. 00
                                                                                         75,                  465, 000. 00           540, 000. 00
        Grand total, new work-..................-------                                 750, 000. 00        8, 514, 877. 90       9, 264, 877. 90
Maintenance (July 1,1937, to June 30, 1938) by
  hired labor:
     Maintenance and repair of existing works_ _...-                                    148, 873.46     120, 000. 00                 268, 873. 46
     Snagging... .............. .... .................                                   10, 000. 00     16, 000. 00                  26, 000. 00
     Channel surveys.........         ......... .   ..  .. . ....                        25, 000. 00--------------                    25, 000. 00
     Surveys, gages, and studies...-..-         _________________                         1, 000. 00.
                                                                                                   0 - _____                           1, 000. 00
     D redging--- --- -------- --- --------       _- -. _ --                             63, 000. 00 -------------                    63, 000. 00
        Total for maintenance_ ........                        ._____......... 247, 873. 46                   136, 000. 00           383,
                                                                                                                                        873.46
        Total for all work.... ..............-----                 -.............     1, 009, 321. 16       9, 275,405. 49        10, 284, 726. 65



   Public Works.--The balance unexpended ($3,568,790.63) from
funds provided under the provisions of the National Industrial Re-
covery Act and accounts receivable ($12.25) will be applied as fol-
lows:

                                                                     Estimated        Kansas City Rulo,Nebr., Kansas City
                                                                    date of corn-      to Rule,   to Sioux City toSiouxCity
                                                                      pletion            Nebr.

Accounts payable----------------------...........................................      $169,880.91           $466, 752. 13   1     $636, 633. 04
                                                                                                        i           -         I
                          New work
Completion of existing contracts:
    Florence Bend and The Narrows, dikes
      and revetment_ _       .. ....._ ___._.._
                                         ..                        Nov. 30, 1937                                50, 000. 00 --------------
    Bellevue Reach, dikes and revetment-.....                      Dec. 31, 1937                               240, 000. 00 --------------
    St. Marys to Plattsmouth Bends, inclu-
      sive, dikes, revetment, and abatis-.......                   June 30,1938                                220, 000. 00 --------------
1010             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937



                                                                            Estimated             Kansas City Rulo, Nebr., Kansas City
                                                                             pletion               toNebr.co-
                                                                                                         lo,  to Sioux City to Sioux City


Completion of existing contracts-Continued.
  Tobacco and Rock Bluff Bends, dikes and
    revetment _____------------------------ Dec. 31,1937                                       $180, 00 000. 00
   Van Horns and Civil Bends, dikes and
    revetment           ......---------- ---               - June 30,1938 ____--______            140, 000. 00
   Copeland and Nebraska Bends, dikes and
    revetment --------- _-__-                              -Dec.     31,1937           -                0 00 _1_9-
                                                                                               - 180, 000.
  Hamburg and Barney Bends, dikes and
    revetment- ........            _.______-----.....__.      July 31,1937 ____________ 10, 000. 00 ..
   Barney Bend to Nishnabotna Bend, inclu-
    sive, dikes, revetment, and abatis.....___                Dec. 31, 1937-     -_____---- 220, 000. 00 __                -__
  Brownville and Langdon Bends, dikes
    and revetment -----              ----------------              do------------ -------- 120, 000. 00
  Indian Cave Bend to Cottier Bend, inclu-
    sive, dikes and revetment_______                     __ June 30, 1938          __-----       597, 161. 12 _
  Nemaha Reach and White Cloud Bends,
    dikes and revetment---..-------------                          do......   $173, 246.75 . ___..            ..----------
  White Cloud and Tarkio Bends, inclusive,
    revetment and abatis . .._-.---_-..                   --.    . do....-.    310, 197. 61
   Charleston and Dallas Bends, dikes and
    revetment ............--               ----........... .. do ..-.          244, 734. 74 ...............
  Burr Oak and Amazonia Bends, dikes and
                             _
       revetment .. __---------__               .....
                                               __----                 _...do.....-------133, 869. 31                       ..
    Forbes Bend, dikes and revetment..__----.....do.......
                                                   ---                                                  86, 926.73
    Kenmoor Bend to Iatan Bends, dikes- ___ Aug. 30, 1937                                               26, 033. 58 ....                 .__.-----
       Total existing contracts (new work)-------------------                                         975, 008. 72           1,957, 161. 12       $2, 932, 169.84
       Total all work (Public Work funds)---..                              -
                                                                        _..-.--.---               1, 144, 889. 63           2, 423, 913. 25           3, 568, 802. 88


  Emergency Relief Administration funds.--The balance unexpended
($2,650,873.08) from funds provided under the terms of the Emer-
gency Relief Appropriation Act of 1935 will be applied as follows:

                                                                           Estimated              Kansas City Rulo, Nebr.,                       Kansas City
                                                                          date of com-              to Rulo,    to Sioux                          to Sioux
                                                                            pletion                   Nebr.       City                              City

Accounts payable. -------- __.--.-                           ..--              _.--------------------                  .        $325,080. 32              $325, 080.32
                         New work
Completion of existing contracts:
  Blair to Bertrand Bends, inclusive, dikes,
    revetments, and      rs    abatis---------------
                                   B     ,n..               Nov.                      30, 1937    .          ....--------------
                                                                                                                          140, 000. 00 ....
   DeSoto to Harrison Bends, inclusive,
    dikes and revetments-------------- Dec.
  Gibson to Bellevue Bends, inclusive, dikes,
                                                                                      31, 1937        ---------                  180, 000. 00    - - -
    revetments, and abatis-----....           --------- June                          30, 1938 ..............                   340, 000. 00          .
  Manawa and Bellevue Bends, dikes and
    revetments.-----...........----------------.. Oct.                                31, 1937-----...-..--                     100, 000. 00      .
  Rock Bluff to Pin Hook Bends, inclusive,
    dikes and revetments- _ _...........                    Dec.                      31,1937------.....                   - 350, 000. 00
  Bartlett to Van Horns Bends, inclusive,
    dikes, revetments, and abatis ..--- ....-------June                               30, 1938 --------------                   240, 000. 00 _
  Otoe and Hamburg Bends, dikes and re-
    vetments ------------------------- Mar.                                           31, 1938                                      00.240,
                                                                                                                                240--------
                                                                                                                                   000. 00
  Hamburg Bend to Nishnabotna Bend,
    inclusive, dikes, revetments, and abatis- June                                    30, 1938 -------------                    290, 000. 00 ..
  Brownville to Aspinwall Bends, inclusive,
    dikes and revetments-..............--                   Mar.
                                                  ...-----------                      31, 1937        _____--- .--              240, 000. 00 _________
  Aspinwall to Lincoln Bends, inclusive,
    dikes, revetments, and abatis---....               .. Sept.                       30, 1937-            ----                 120, 000. 00
  Morgan to Deroin Bends, inclusive, dikes,
    revetments, and abatis-             ---      ------ . Sept.                       30, 1937-                                  45, 792. 76 ........
  Lincoln to Indian Cave Bends, inclusive,
    dikes.....-----------.........  ----------------- Sept.                           30, 1937 --------------                    40, 000. 00     _-             -
         Total existing contracts---------.....................------------                       _               ..       2, 325, 792. 76            2, 325, 792.76
         Total for all work-------------------.....................              -----------               --...           2, 650, 873.08             2, 650, 873.08


  The additional sum of $6,685,000 can be profitably expended during
the fiscal year 1939, as follows:
                    RIVERS AND HARBORS-OMAHA,                                                     NEBR., DISTRICT                                 1011

                                                                                                Kansas City Rulo, Nebr.,                   Kansas City
                                                                                                 to Rulo,     to Sioux                       to Sioux
                                                                                                       Nebr.                City                City

New work (July 1, 1938, to June 30, 1939), channel contraction
and bank protection work by dike and revetment con-
struction:
    By contract-------      --   ----------------------                    $500, 000                                     $4, 600, 000          $5, 100, 000
    By hired labor           - - --. --..  . ..     ..   ...                                                                 825, 000              825, 000
    Dredging to obtain desired channel alinement....         --......-....----..-...-                                         75, 000               75, 000
        Total new work..                    .......-----------------------   ....-..-----                500,000           5, 500,000           6,000,000
Mlaintenance (July 1, 1938, to June 30, 1939):
    By hired labor:
        Maintenance and repair of existing works .........                                               250, 000        155, 000                  405, 000
        Snagging operations___ ___ __........____ . . --                                                  30, 000         20, 000                   50, 000
        Surveys, gages, and studies .                                                                     25, 000          10, 000                  35, 000
        Project dimensions by dredging . _. -, ........                                                  170, 000 --------------                   170, 000
        Channel surveys---..-- ------------    --------------                                             25, 000      ...--------------            25, 000
              Total maintenance--.      ..------------                          ....-       .            500, 000               185, 000           685, 000
              Total for all work._      ______                        .
                                                           ________ _____ .                            1, 000, 000         5, 685, 000          6, 685, 000



                                            Cost and financial summary
                               MAINTENANCE                      AND          IMPROVEMENT                   FUNDS


Cost of new work to June 30, 1937________________________                                                                          $21, 871,408.53
Cost of maintenance to June 30, 1937__ _____                                                                                         1, 467, 410. 95

            Total cost of permanent work to June 30, 1937-- _____--                                                                 23, 338, 819. 48
Undistributed costs June 30, 1937 ___________________                                                                                      695, 582. 69

            Net total cost to June 30, 1937------------------------                                                                 24, 034, 402. 17
Pius accounts receivable June 30, 1937____________________                                                                                  21, 698. 19

     Gross total costs to June 30, 1937_________________                                                                            24, 056, 100. 36
Minus accounts payable June 30, 1937__                                                                                                  6______________-------63
                                                                                                                                             975. 29
     Net total expenditures____________-2_______--- - -                                                                             23, 420, 125. 07
Unexpended balance June 30, 1937_________--------__                                                                                    3, 127, 028. 46

            Total amount appropriated to June 30, 1937------__                                                                      26, 547, 153. 53


   Fiscal year ending                1933                        1934                           1935                     1936                  1937
         June 30

Cost of new work .....        $4, 161, 251. 93           $2, 533, 689. 94                   $357, 148. 77             $468, 115. 05         $5, 283, 009. 13
Cost of maintenance.__             96, 159. 60                94, 642. 49                     68, 980. 31              103, 197. 07             220, 709. 67
        Total cost- .....      4, 257, 411.53              2, 628, 332. 43                   426,129. 08               571, 312. 12          5, 503, 718. 80
Total expended ......          4, 110, 050. 44             2, 728, 588. 26                   483, 683. 70              652, 006. 26          5, 569, 518. 88
Allotted------------6,           109, 296. 51              1, 073, 181. 02                   358, 188. 11            7, 209, 031. 76         1, 405, 213. 75



Balance unexpended July 1, 1936_________________               __ $7, 291, 333. 59
Amount allotted from War Department Appro-
priation Act approved April 26, 1934__________     $40,078. 66
Amount allotted from War Department Appro-
priation Act approved April 9, 1935_                57, 479. 99
Amount allotted from War Department Appro-
priation Act approved May 15, 1936 ________     1, 820, 872. 68
Amount allotted from War Department Appro-
priation Act approved Feb. 28, 1929_____            79, 768. 67
1012            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Appro-
priation Act May 28, 1930--------------------                                             $1, 800. 00
Amount allotted from Emergency Relief Appro-
priation Act approved July 21, 1932_ _________                                                213. 75
                                                                                                                   $2, 000, 213. 75
      Amount to be accounted for _________________________     9, 291, 547. 34
Deductions on account of revocation of allotment -------------    595, 000. 00
      Net amount to be accounted for________                   8, 696, 547. 34
Gross amount expended----------------------- $6, 244, 562. 48
Less reimbursements collected                     75, 043. 60
                                                 6________________
                                                               5, 569, 518. 88
      Balance unexpended June 30, 1937-___________________                                                          3, 127, 028. 46
Outstanding liabilities June 30, 1937------------$385, 171. 66
Amount covered by uncompleted contracts------- 2, 517, 546. 64
                                                                                                                    2, 902, 718. 30
           Balance available June 30, 1937 ________________________                                                    224, 310. 16
Accounts receivable June 30, 1937____________________________                                                           21, 698. 19
     Unobligated balance available June 30, 1937 _   __   _                                                            246, 008. 35
Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937_----------------_____                               _           --                        7, 136, 000. 00
           Balance available for fiscal year 1938-                                         _                        7, 382, 008. 35
Amount (estimated) required to be appropriated for completion
of existing project ------------------------------------                                                          24, 800, 000. 00
Amount that can be profitably expended in fiscal year ending
   June 30, 1939:
                                       -
       For new work                        --    _--
                                                -1__-                                                               6, 000, 000. 00
       For maintenance                                                                                       ---       685, 000.00

           Total                                                                                                      , 685, 000. 00
                                                                                                                    6-----------

                                                    PUBLIC WORKS            FUNDS

Cost of new work to June 30, 1937--------------------------- $26, 113, 463. 34
Cost of maintenance to June 30, 1937 -------------------------    108, 061. 79
      Total cost of permanent work to June 30, 1937----------                                                      26, 221, 525. 13
Undistributed costs June 30, 1937-------------------                                                                     -586. 97
      Net total cost to June 30, 1937 -----------------------                                                      26, 220, 938.16
Plus accounts receivable June 30, 1937------------------------                                                               12. 25
      Gross total costs to June 30, 1937----------------------                                                     26, 220, 950. 41
Minus accounts payable June 30, 1937------------------------                                                           636, 633. 04
     Net total expenditures ------------------------------                                                         25, 584, 317. 37
Unexpended balance June 30, 1937_-----------------                                                                  3, 568, 790. 63
           Total amount appropriated to June 30, 1937-                                           --                29, 153, 108. 00


   Fiscal year ending                 1933                   1934                 1935                1936                 1937
          June 30

Cost of new work..-----..........----.....    $7, 792, 597. 22             $11, 307, 694. 33   $5, 713, 353. 57         $1, 299,818.22
Cost of maintenance___._---.---.----------. _13,                                     326. 69        67, 188. 59              27, 546. 51
        Total cost--_       _----------_           -7,     792, 597. 22     11, 321, 021. 02    5, 780, 542. 16          1, 327, 364. 73

Total expended-- ..--..-----------------                 6, 929, 385. 88    10, 539, 679. 99    6, 085, 664. 97          2, 029, 586. 53

Allotted--------.......--.......                        14,153,108. 00
                                   ........----------------.                15, 000, 000. 00............--------------

    1Exclusive of available funds.
                  RIVERS AND HARBORS-OMAHA, NEBR., DISTRICT                                                                        1013
Balance unexpended July 1, 1936.----__--__        _.-   --.... --                                                  $5, 598, 377. 16
Gross amount expended- ----------__         ___ $2, 207, 885.99
Less reimbursements collected-- -- ________         178, 299. 46
                                                                                                                       2, 029, 586. 53
      Balance unexpended June 30, 1937-------    -------------                                                         3, 568, 790. 63
Outstanding liabilities June 30, 1937-----------$301,506.69
Amount covered by uncompleted contract -__ _ 3, 267, 283. 94
                                                                                                                       3, 568, 793. 63
      Balance available June 30, 1937
Accounts receivable June 30, 1937----                              ___-__--____-_______                                            12. 25

          Unobligated balance available June 30, 1937                                                                                  25
                                                                                                                                   1------------2.
                                                   EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937_- -     _________________$7, 249,198. 55
Cost of maintenance to June 30, 1937-------- ------------       56, 644. 65

      Total cost of permanent work to June 30, 1937                                                                     , 305, 843. 20
                                                                                                                       7----------
Undistributed costs June 30, 1937--------------------------                                                                43, 364. 04
      Net total cost to June 30, 1937-----------------------7, 349, 207. 24
Minus accounts payable June 30, 1937-------------------------- 325, 080. 32
     Net total expenditures ---------------------------------                                                          7, 024, 126. 92
Unexpended balance June 30, 1937-------------- ------- _____                                                           2, 650, 873.08
           Total amount appropriated to June 30, 1937_____________                                                     9, 675, 000. 001

   Fiscal year ending                   1933                   1934                   1935              1936
          June 30                                                                                                               1937


Cost of new work____-----------............ -------................           ......      ....      $5, 928, 354. 17    $1, 320, 844. 38
Cost of maintenance___---------------- ---------                             ----------------            56, 644. 65 ................
       Total cost-_-- .                     __...---------------- ----------------...............    5, 984, 998. 82          1, 320, 844. 38
Total expended     -------------------------------.---                                               5, 762, 266. 15          1, 261, 860. 77

Allotted --------          --------------------------------                       $10, 000, 000      -325, 000. 00      _._



Balance unexpended July 1, 1936------------------------------ $3, 912, 733.85
Gross amount expended--------------------- $1, 701, 833.22
Less reimbursements collected- --                  439, 972. 45
                                                                1, 261, 860. 77
      Balance unexpended June 30, 1937---------------------                                                            2, 650, 873. O0
Outstanding liabilities June 30, 1937 -                   $66. 37
Amount covered by uncompleted contracts .....-    2, 650, 806. 71
                                                                                                                       2, 650, 873. 08
CONSOLIDATED           COST AND FINANCIAL SUMMARY FORl MISSOURI                                         RIVER,       KANSAS         CITY,
                                    MO., TO SIOUX CITY, IOWA

Cost of new work to June 30, 1937 --------------------------                                                     $55, 234, 070. 42
Cost of maintenance to June 30, 1937--.......                                                                      1, 632, 117. 39
      Total cost of permanent work to June 30, 1937----------                                                      56, 866, 187. 81
Undistributed costs June 30, 1937----_                                                                                 738, 359. 76
      Net total cost to June 30, 1937..                                                                            57, 604, 547. 57
Plus accounts receivable June 30, 1937___                                                                               21, 710. 44
           Gross total costs to June 30, 1937---------------------                                                 57, 626, 258. 01
1014         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937_________________ _____                                                      $1, 597, 688. 65

     Net total expenditures---------- -----------------------                                                    56, 028,569. 36
Unexpended balance June 30, 1937 _________ _________ __                                                           9, 346, 692. 17
        Total amount appropriated to June 30, 1937 ____________                                                 65, 375, 261. 53

  Fiscal year ending          1933                    1934                      1935                     1936              1937


Cost of new work......    $4, 161, 251.93      $10, 326, 287. 16         $11, 664, 843. 10       $12, 109, 822. 79      $7, 903,671. 73
Cost of maintenance...        96, 159. 60             94, 642. 49               82, 307. 00          227, 030. 31          248, 256. 18
      Total cost.......    4, 257, 411. 53      10, 420, 929. 65          11, 747, 150. 10        12, 336, 853. 10       8, 151, 927. 91
Total expended.......      4, 110, 056. 44       9, 657, 974. 14          11, 023, 363. 69        12, 499, 937. 38       8, 860, 966. 18
Allotted...............    6, 109, 296. 51      15, 226, 289. 02          25, 358, 188. 11         6, 884, 031.76        1, 405, 213. 75



Balance unexpended July 1, 1936______________________            __- _ $16, 802, 444. 60
Amount allotted from War Department Appro-
priation Act approved April 26, 1934_.....__         $40, , 078. 66
Amount allotted from War Department Appro-
priation Act approved April 9, 1935 ---------         57, ,479. 99
Amount allotted from War Department Appro-
priation Act approved May 15, 1936---------       1, 820,, 872. 68
Amount allotted from War Department Appro-
priation Act approved Feb. 28, 1929_- --   __--79         ,768. 67
Amount allotted from War Department Appro-
  priation Act approved May 28, 1930      -             11--------
                                                           ,800. 00
Amount allotted from Emergency Relief Appro-
   priation Act approved July 21, 1932                        --                                   213. 75
                                                                                                                     2, 000, 213. 75
      Amount to be accounted for-------------------                                                ---           18, 802, 658. 35
Deductions on account of revocation --------------------------                                                       595, 000. 00

      Net amount to be accounted for                                                                             18, 207, 658. 35
Gross amount expended----------------------- $10, 154, 281. 69
Less reimbursements collected-----------------1,293,315.51
                                                                                                                     8, 860, 96 3. 18

      Balance unexpended June 30, 1937_________________                                                              9, 346, 692. 17
Outstanding liabilities June 30, 1937                    ------------
                                                 $686, 744. 72
Amount covered by uncompleted contracts------   8, 435, 637. 29
                                                                                                                     9, 122, 382. 01

     Balance available June 30, 1937_                                                                                  224, 310. 16
Accounts receivable June 30, 1937______                                                                                 21, 710. 44

     Unobligated balance available June 30, 1937   --                                                                  246, 020. 60
Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937_____                      _- -                                                             7, 136, 000. 00
                                                                                                     -__________________



     Balance available for fiscal year 1938 _____________...                                                         7, 382, 020. 60
Amount (estimated) required to be appropriated for completion
   of existing project ---------------------------------------                                                   24, 800, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:  - - - - - - - - - - - - - - - - -
      For new work                                         ----------------------                                    6, 000, 000. 00
                             1- - - - - - - - - - - - - - - - - - - - - - -
      For maintenance                                                         ----------------                          685, 000. 00

         Total'                                                                               ~-------               6, 685, 000. 00
   1 Exclusive of available funds.
         RIVERS AND HARBORS-OMAHA,          NEBR., DISTRICT       1015
2. MISSOURI RIVER, SIOUX CITY, IOWA, TO FORT BENTON, MONT.

   Location.-See page 1005. Through this section the river flows
across the States of Montana and North Dakota and South Dakota,
forming the northeastern boundary of Nebraska.
   Previous projects.-Projects were adopted and modified by river
and harbor acts as follows: August 14, 1876, above the mouth of the
Yellowstone; June 18, 1878, Sioux City; March 3, 1879, Vermilion;
and August 2, 1882, Sioux City to Fort Benton. Modifications of
September 19, 1890, and August 18, 1894, extended the improvement
to Great Falls, then to Stubbs Ferry, Mont.
   The total costs and expenditures to June 30, 1912, were $2,823,-
061.61, of which $2,606,655.87 was for new work and $216,405.74 for
maintenance. (For further details see p. 1108 of Annual Report for
1927 and p. 1894 of Annual Report for 1915.)
   Existing ,project.-This provides for the expenditure of from
$75,000 to $150,000 yearly for 5 years from date of the project in
the removal of snags and rocks from the channel and in bank pro-
tection within easy boat reach of landings, towns, and railroad cross-
ings between Sioux City, 769 miles above the mouth, and Fort Ben-
ton. Since the expiration of the 5-year limit, funds have been ex-
pended in the maintenance of existing landings. At Sioux City the
ordinary fluctuation is about 10.4 feet, and the extreme fluctuation
 (freshet of 1892 from Floyd River) is about 25 feet. At Fort Benton
the ordinary fluctuation is about 7.3 feet, and the extreme fluctuation
about 19 feet.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 91, 62d Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-Works for the benefit of the public constructed
by private interests at their own expense were:
   Williston, N. Dak.: The State Highway Depatrment completed
construction of 9,780 linear feet of revetment on the right bank of
the Missouri River 10 miles upstream from Williston, N. Dak. Con-
struction cost was $184,709.98, exclusive of engineering and supervi-
sion.
    Pierre, S. Dak.: The city completed construction of dikes and
bulkheads (old car bodies, stone, and miscellaneous material) under
the highway bridge and one dike at Fort and Pierre Streets. Cost
of the work was $3,125.00.
    Chamberlain, S. Dak.: The Department of the Interior is con-
structing revetment on the right bank of the Missouri River near
Chamberlain, S. Dak., as protection to American Island Park; 4,700
linear feet of the contemplated work is completed. Cost to date is
 $104,180 ($3,055 Emergency Conservation Work funds for materials,
$96,755 Civilian Conservation Corps labor, and $4,350 local partici-
pation).
    Terminal facilties.-The facilities are considered adequate for
existing commerce.
    Operations and results during fiscal year.-Work accomplished
during the year amounted to $416.74 charged to maintenance; no
expenditures were made.
1016           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Condition at end of fiscal year.-As cutting of the banks is less
marked above Sioux City and is of little moment above the mouth
of the Yellowstone River, demand for bank-protection work is not
so urgent as on the lower Missouri River. In 1878 rock dams and
dikes were built between Fort Benton and Carroll, Mont., to concen-
trate the meager low-water flow, and the rapids were cleared of rocks
and boulders; but, lacking maintenance, the river has reverted for
the most part to the previous state. Limited appropriations hold
Government expenditures to meritorious cooperative projects, and a
small amount of repair to existing works.
  From April to October, inclusive, drafts of 30 inches are practi-
cable to Pierre, 26 inches to the Montana State line, and 22 inches
to Fort Benton.
  The cost of new work under the existing project to June 30, 1937,
was $516,484.77, and the cost of maintenance was $410,456.81, a total
of $926,941.58. The expenditures were $927,841.58.
  Proposed operations.-The balance unexpended, $5,401.26, at the
end of the year will be applied as follows:
Maintenance (July 1, 1937, to June 30, 1938) :
   Maintenance and repair of existing works (hired labor) _-                                                     -       $3, 401.26
    Snagging operations (contract) ---------------------------                                                            2,000.00

         Total for all operations ___________---______________                                                            5, 401. 26
  The additional sum of $10,000 can be profitably expended during
the fiscal year ending June 30, 1939, for maintenance and snagging
operations.
                                             Cost and financial summary
Cost of new work to June 30, 1937_____      ____________________ $3, 123, 140. 64
Cost of maintenance to June 30, 1937 __________-----626,                  862. 55
      Total cost of permanent work to June 30, 1937-                                                  --             3, 750, 003. 19
Undistributed costs June 30, 1937-----------------   __-____                                                                 900. 00
         Net total cost to June 30, 1937_______________________                                                   3, 750, 903. 19

Net total expenditures __--     ________-                                           ____              __-         3, 750, 903. 19
Unexpended balance June 30, 1937 ____________                                        ______            ___             5, 401. 26

        Total amount appropriated to June 30, 1937___________                                                     3, 756, 304. 45

         Fiscal year ending June 30                            1933          1934         1935                1936              1937


Cost of new work .. --------------------------------                         $439.00 ------------          $3, 080. 55 --....
Cost of maintenance-------------------$4, 285.43                            7, 718.09    $423.48               416. 76           $416.74
      Total cost .......                    ..-----------------------
                                                                4, 285.43   8,157. 09      423.48           3, 497. 31            416. 74
Total expended..__-----------------------                    3, 814. 31     2, 021. 57     -5. 46           3, 080. 55------
Allotted....     .   ..-----------------------------          -198. 98      5, 735. 37   4, 500. 00           ..------------ -4, 000.00


                                 --------------------------------
Balance unexpended July 1, 1936___                                                                                       $9, 401. 26
Deductions on account of revocation of allotment---                                                                       4, 000. 00

         Balance unexpended June 30, 1937_                                                             -             -    5, 401.26
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance1                                                                                              10, 000. 00
   xExclusive of available            funds.
                RIVERS AND HARBORS-OMAHA, NEBR., DISTRICT                                                     1017
     3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)
   The cost of work during the year was $97,616.61 and the expendi-
tures were $96,597.49. The balance unexpended ($20,259.08) at the
end of the fiscal year, together with an allotment of $10,000 received
during July 1937, will be applied as needed during the fiscal year
1938 to payment of expenses incurred under this heading. The addi-
tional sum of $20,000 can be profitably expended during the fiscal
year ending June 30, 1939.
                                      Cost and financial summary
Cost of new work to June 30, 1937--                                              --                 -
Cost of maintenance to June 30, 1937__________________________                                          $116, 059. 52

         Total cost of permanent work to June 30, 1937                                                   116, 059. 52
Minus accounts payable June 30, 1937_____________________                                                  1, 329. 25

     Net total expenditures_____________                                                                1__________-
                                                                                                        114, 730. 27
Unexpended balance June 30, 1937------------------------------                                           20, 259.08
         Total amount appropriated to June 30, 1937______                                  ___           134. 989.35

         Fiscal year ending June 30                  1933          1934         1935         1936             1937


                    -
C ost of new w ork . . . . . . . .. . . . I ........................
Cost of maintenance . ......... __       - ...
                                            __ .__    . ..   -- $2, 405. 69   $7, 715.
                                                                                     34    $8, 321. 88      $97, 616.
                                                                                                                    61
Total expended...............----------------------..------------2,369. 19     7, 581.40    8, 182. 19       96, 597. 49
Allotted............---------------------------------------       2 989. 35   19,000. 00    8, 000. 00      105, 000. 00


Balance unexpended July 1, 1936-------------------------------                                          $11, 856. 57
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936_             --------------------------                                           105, 000.00

      Amount to be accounted for-----------------------------                                           116, 856. 57
Gross amount expended---------------------------    $102, 243. 35
Less reimbursements collected__-_____________-___       5, 645. 86
                                                                                                         96, 597.49
      Balance unexpended June 30, 1937______---------      ______                                        20, 259. 08
Outstanding liabilities June 30, 1937___________________________                                          9, 017.06
     Balance available June 30, 1937----------------------                                               11, 242. 02
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------ -----------------------------                                            0, 000. 00
         Balance available for fiscal year 1938---_______________                                        21, 242 .02
Amount that can be profitably expended in fiscal year ending June
                                   - -- - -
30, 1939, for maintenance 1 - - - __
                                   _           _______________                                           20, 000. 00
   1Exclusive of available       funds.
1018             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                 4. PLANT ALLOTMENT FOR OMAHA, NEBR., DISTRICT

                                              Cost and financial summary
Undistributed costs June 30, 1937_______________________ ___ $472, 948. 10
Plus accounts receivable June 30, 1937__________________________ 90, 379. 60
      Gross total costs to June 30, 1937                                     ___________________ 563, 327. 70
Minus accounts payable June 30, 1937 _-                                        -___-_____________36,  824. 47

     Net total expenditures _________________________                                             __              526, 503. 23
Unexpended balance June 30, 1937           ____________                                                           253, 320. 39
           Total amount appropriated to June 30, 1937 ______________                                              779, 823. 62

    Fiscal year ending June 30                       1933             1934          1935            1936              1937


Total expended------------------...........................   ............        $98,449. 26    $280, 963. 99      $147,089. 98
Allotted....................--------------------------------------------          149, 886. 38    611, 978. 64        17, 958. 60


Balance unexpended July 1, 1936_________________                                                                 $382, 451.77
Amount allotted from War Department Appropriation                                                Act ap-
proved May 15, 1936_______--- __________-__                                                                       17, 958. 60
      Amount to be accounted for___        _____      _                                                           400, 410. 37
Gross amount expended -- ___    _____-____- __-__ $950, 727. 05
Less:
    Reimbursements collected_________ $802, 726. 24
    Receipts from sales ----------------      910. 83
                                                        803, 637. 07
                                                                                                                  147, 089. 98

      Balance unexpended June 30, 1937_                                                                           253, 320. 39
Outstanding liabilities June 30, 1937__________________ $90, 526. 30
Amount covered by uncompleted contracts------------3, 606. 25
                                                                                                                   94, 132. 55

     Balance available June 30, 1937------------------------                                                      159,187.84
Accounts receivable June 30, 1937__-- ____- ______---_--                                                           90, 379. 60

           Unobligated balance available June 30, 1937--------------249, 567.44

             5. MISSOURI RIVER, NIOBRARA, NEBR., FLOOD CONTROL

   Location.-At or near the town of Niobrara, Nebr., on the Missouri
River.
   Existing project.-An allotment of $130,000 was provided in the
War Department Appropriation Act aproved May 15, 1936, to pro-
vide maintenance, repairs, and revetment work as needed in the
flood-control work prosecuted by the Works Progress Administration
at or near the town of Niobrara, Nebr.
   Operationsand results during fiscal year.-Constructionon the pro-
ject involving 8,052 linear feet of revetment was completed. Cost of
new work was $99,294.75 and expenditures were $99,269.80.
   Condition at end of fiscal year.-Work previously completed by the
Works Progress Administration consisting of 7,240 linear feet of
revetment has been augmented by construction of 8,052 linear feet of
revetment under this project. The project is substantially complete
except for maintenance and repairs to be accomplished during the
fiscal year 1938. Cost of new work to date is $99,294.75 and ex-
penditures are $99,274.80.
                    RIVERS AND HARBORS-OMAHA, NEBR., DISTRICT                                                                                        1019
  Proposed operations.-The balance unexpended, $30,725.20 (includ-
ing $19.95 accounts payable), at the end of the year will be applied
to final repair and completion of this flood-control revetment. No
additional funds are requested for the fiscal year ending June 30,
1939.
                                                   Cost and financial summary
Cost of new work to June 30, 1937_ ----------------------- -- $99, 294. 75
Cost of maintenance to June 30, 1937----------------------------------

      Total cost of permanent work to June 30, 1937 ---------                                                                                9-- 294. 75
                                                                                                                                            99,
Minus accounts payable June 30, 1937----------------------------                                                                                      19. 95
     Net total expenditures                                                                                                                 9-------------------------------
                                                                                                                                                274. 80
Unexpended balance June 30, 1937                                                                                                            30, 725. 20
            Total amount appropriated to June 30. 1937                                                      ___------       -            130. 000. 00

            Fiscal year ending June 30                                  1933                 1934              1935             1936                 1937


Cost of new work-------                              -----------                      ----------------------------                             $99, 294. 75
Cost of maintenance-----.....                           ...
                                                     ----------                       ----------          ---       -
                                                                                                    .........-----------   ---------
Total expended                  .--------------------------------------------------                                                    $5           99, 269. 80
Allotted-----------------------------------                                                                                     130, 000.........


Balance unexpended July 1, 1936------------------------------       $129, 995.00
Gross amount expended-------------                    $102, 350.95
Less reimbursements collected-----------------___        3, 081. 15
                                                                      99, 269. 80
            Balance unexpended                          June 30, 1937 .                        .----                                        30, 725. 20
Outstanding liabilities June 30, 1937 ___-__-______-__________-5, 000. 00

            Balance available June 30, 1937---------------------------                                                                       25, 725. 20

                            6. MISSOURI RIVER BASIN, FLOOD CONTROL

                                                  (A)      COUNCIL              BLUFFS, IOWA


   Location.-Council Bluffs, Iowa, near confluence of Indian Creek
with Missouri River, Iowa.
   Existing project.-This provides for improvement and enlarge-
ment of the existing channel of Indian Creek in Council Bluffs, Iowa,
from a point upstream 200 feet above Frank Street, following the
old channel of Indian Creek to a junction with the Missouri River,
a distance of approximately 30,280 feet. The improved channel is
designed to discharge 6,000 cubic feet per second with a maximum
flood stage in the Missouri River corresponding to the high-water
mark of 1881. City engineer of Council Bluffs reports an estimated
total cost of $1,651,000. The estimated construction cost stated in
the act is $1,532,300, and $166,000 for lands and damages. The
project was authorized in the Flood Control Act of June 22, 1936.
   Local cooperation.-See page 6. Carried on as a Works Progress
Administration flood-control project. The city engineer of Council
Bluffs reports work began February 27, 1936, and practically com-
pleted February 12, 1937. The improved channel consists of 15,700
linear feet of dirt channel at the lower end and 21,896 linear feet
of concrete channel of which 7,367 linear feet is covered. Project
1020    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

was financed by city bond issue of $908,600 supplemented by $742,400
to be paid by the Federal Government. There is a very small
amount of work remaining to be done. All work is covered by
contract.
   Operations and results during fiscal year.-None by this office.
  Condition at end of fiscal year.-Project is substantially completed
as a Works Progress Administration project.
  Proposed operations.-None by this office.
            (B)   CHEYENNE RIVER, BELLE FOURCHE, S. DAK.

   Location.-Belle Fourche at confluence of Belle Fourche and Red-
water Rivers, tributaries of Cheyenne River, S. Dak.
   Existing project.-This provides for the construction of levees to
protect people and city property from floodwaters (H. Doc. No. 190,
72d Cong., 1st sess.). The project was authorized in the Flood Con-
trol Act of June 22, 1936, at an estimated cost of $24,100 for con-
struction and $22,400 for lands and damages. The latest approved
estimate (1937) for construction cost is $29,000; and for costs of
lands and damages $2,100.
   Local cooperation.-See page 6. Local cooperation is assured.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The definite project has been ap-
proved.
   Proposed operations.-An allotment of $29,000 made during the
fiscal year ending June 30, 1938, will be applied to early completion
of the definite project.

              (C)   YELLOWSTONE RIVER, FORSYTH, MONT.

   Location.-Forsyth and vicinity on Yellowstone River, Mont.
   Existing project.--This provides for the construction of levees
to protect people and city property (H. Doc. No. 256, 73d Cong.,
2d sess.). The project was adopted by the Flood Control Act of
june 22, 1936, at an estimated cost of $65,900 for construction and
$13,200 for lands and damages. The latest (1937) approved estimate
for construction cost is $97,000; and estimated cost of lands and
damages $17,900.
   Local cooperation..-See page 6. Local cooperation is assured.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Definite project approved.
   Proposed operations.-An allotment of $80,000 made during the
fiscal year ending June 30, 1938 will be applied to the project.

                          (D)   WIBAUX,   MONT.

   Location.-On Beaver Creek, 62 miles above confluence with Little
Missouri River.
  Existing project.-This provides for construction of levees to pro-
tect people and city property (H. Doc. No. 64, 73d Cong., 1st sess.).
The project was authorized in the Flood Control Act of June 22
1936. The estimated construction cost is $42,300; estimated cost oI
lands and damages $65,000. The estimated cost of lands and dam-
               RIVERS AND HARBORS-OMAHA, NEBR., DISTRICT                                                           1021
ages in the flood control act was $62,400. Proposed work will re-
quire a slight increase in authorization.
  Local cooperation.-See page 6. Local cooperation does not ap-
pear likely at this time. The citizens do not favor any plan involv-
ing the construction of levees.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.--Work has not been started.
  Proposed operations.-No work is contemplated due to noncom-
pliance with conditions of local cooperation.

                                           (E)       MARMARTH, N.              DAK.


   Location.-At confluence of Little Beaver Creek and Little Mis-
souri River, N. Dak.
  Existing project.-This provides for construction of levees to pro-
tect people and city property (H. Doc. No. 64, 73d Cong., 1st sess.).
The project was authorized in the Flood Control Act of June 22,
1.936. The latest (1937) approved estimate for construction cost is
$18,970; and for cost of lands and damages, $3,000.
   Local cooperation.-See page 6. A portion of the works have
been built by local interests. Local cooperation does not appear
likely at this time. The citizens have presented a petition requiring
protection for that part of the city lying north of the Chicago,
Minneapolis, St. Paul & Pacific Railway in any flood-control plan.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work has not been started ex-
cept for the work accomplished by local interests.
   Proposed operations.-None, since it appears improbable that the
conditions of local cooperation will be met.
Status of reports called for by river and harbor acts and committee resolutions

                                                                 Date trans-                                  Recommenda-
        Locality                    Authorization act            mitted to              Document no.          Recommenda-
                                                                  Congress                                        tion

Bad River, S.            Dak.     Flood Control Com-
  (flood control).                 mittee resolution
                                    Aug. 18, 1937.
Beaver Creek, S. Dak. _--_do....-----. . . . ..                       . .      ..   .     .   .   .   .   .
  (flood control).
Cannonball River, Bow- Senate committee reso-
man irrigation project,  lution, June 22, 1937.
  N. Dak.
Carter Lake, Iowa and             River and Harbor Act, ........................................
Nebr.                                Aug. 26, 1937.
Fall River,        S.    Dak.     Flood Control Com--
  (flood control).                 mittee resolution,
                                    Aug. 18, 1937.
Heart River, N. Dak.,             Senate committee reso-
 (irrigation project).              lution, June 22, 1937.
Keyapoha     River,    S.         Flood Control Com-         .
  Dak. (flood control).            mittee resolution, .
                                    Aug. 18, 1937.
Missouri River (diver-            Senate committee reso- ..-------------------------------
  sion project).                    lution, June 22, 1937.
Missouri River at and             Rivers and Harbors
above Sioux City,                 Committee resolu-
Iowa.                              tion, Jan. 29, 1937.
White River, S. Dak.              Flood Control Com-
  (flood control).                  mittee resolution,
                                     Aug. 18, 1937.
Yellowstone             River,   _..do   ..
  Wyo., Mont., and N.
  Dak. (flood control).
1022      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

IMPROVEMENT OF RIVERS AND HARBORS IN THE FORT
            PECK, MONT., DISTRICT
  The improvement of the Missouri River above the mouth of the
Yellowstone River (about mile 1,6901) is under the jurisdiction of
the Fort Peck, Mont., district.
  District engineer: Lt. Col. T. B. Larkin, Corps of Engineers.
  Division engineer: Col. R. C. Moore, Corps of Engineers.
                                    IMPROVEMENTS
                                                                              Page.
1. Missouri River'at Fort Peck, Mont     ____________                         1022
2. Milk River, Mont., flood control _-____--  ___---------------__--   _      1029

                1. MISSOURI RIVER AT FORT PECK, MONT.

   Location.-The site of the Fort Peck Reservoir is in the Missouri
River Valley in McCone, Valley, Garfield, Phillips, Petroleum, and
Fergus Counties, Mont. The dam site is approximately 11 miles
above the mouth of Milk River in secs. 14, 15, 16, 21, and 22, T. 26, N.,
R. 41 E. The west (left) abutment is in Valley County, and the east
(right) abutment is in McCone County. Nearest towns are Glasgow,
17 miles northwest, and Nashua, 9 miles north.
   Existing project.-The provision of an earth dam for impound-
ing water for the improvement of navigation on the Missouri River,
Sioux City to the mouth, as recommended by the Chief of Engineers,
September 30, 1933, was authorized by the Public Works Adminis-
tration October 24, 1933, and adopted by the River and Harbor
Act of August 30, 1935 (H. Doc. No. 238, 73d Cong., 2d sess.).
   The estimate of cost for new work, revised in 1937, is $109,600,000.
   Detailed data regarding the dam are as follows:
                                      Description

Location, miles above mouth of Missouri River-------------------             1, 878
Concrete spillway in right abutment, discharge capacity (second-
  feet)              ----------------------------------------              250, 000
Height of main dam above stream bed (feet) ---------------------                240
Height of top of parapet wall above stream bed (feet)                           254
Crest elevation of dam (feet, mean sea level)       __         ___           2, 270
Tunnels for releasing water from reservoir (4), diameter (feet) __           24'8"
Maximum pool level (feet, mean sea level) -----------------------            2, 250
Normal pool level (feet) --------------------------------------              2, 246
Crest length of dam     (feet) --------                    -------          21, 160
Maximum storage capacity (acre-feet)              _               19, 412, 000
Normal operating storage capacity (acre-feet)       -------------
                                                            ___   18, 400, 000
Total construction cost of reservoir (estimated)  - ----        $109, 600, 000
Annual operation and maintenance cost (estimated)------------        $106, 000
Date construction started---------------------------------       Oct. 23, 1933
Estimated date of completion --------------------     -----         Oct. 1939
Datum-mean sea level (1929 Adjustment U. S. Coast and Geodetic
  Survey).
  Terminal facilities.-No terminal facilities are entailed in this part
of the project.
    1890 mileage.
              RIVERS AND HARBORS-FORT PECK, MONT., DISTRICT                                                             1023
   Operations and results during fiscal year.-The work accomplished
during the fiscal year was as follows:
  Danm.-Hired labor operations were continued with the following
results:

                                           Feature                                                 Quantity           Cost

Hydraulic fill (4 dredging units operated an average of 209 days each) (cubic
yards placed) ----------       ....        _._ ..-------------------
Gravel toes (cubic yards placed)..-----------
                                                                            ---------          -
                                                                                                   30, 154, 700
                                                                                                       268, 493
                                                                                                                  $6, 183, 170. 36
                                                                                                                      531, 247. 81
Rock toes (cubic yards placed) -.                  ..-----------------------------------------          33, 418       144, 164. 84
Upstream facing:
    Gravel blanket (cubic yards placed) ----------------------------------                              84, 790      184, 527. 91
    Field stone (cubic yards placed) ------------------------------------                              103, 182      467, 179. 20
Stream diversion (cubic yards excavated)             ------------------------------                 1,058, 670        90, 311. 75



  Diversion tunnels.-Hired-labor operations were continued. The
contracts for the plate-steel lining for tunnel no. 1, for the emergency
gate shafts, and for coating the plate-steel lining of tunnel no. 1,
were completed. The river was diverted through the tunnels on
June 24, 1937. Design of the main control gates was continued.
The following costs were incurred during the fiscal year:
Excavation and lining (hired labor)--------------------------                                              $9, 323, 136. 40
Plate-steel lining for tunnel no. 1 (contract) __      _                                                    1, 113, 053. 97
Completion of emergency gate shafts (contract) ------------                                                 1, 285, 413. 95
Coating plate-steel lining, tunnel no. 1 (contract) -------------                                               53, 552. 79
  Spillway.-Contract operations were continued. The contract for
the operating equipment was awarded on January 5, 1937. The fol-
lowing costs were incurred during the fiscal year:
Lined channel and appurtenances__--------------------$2, 880, 923. 20
Gate structure                                             498, 891. 29
                                                        2----------------------------------
Gate operating equipment_------------------------------    193, 255. 09
  Reservoir (exclusive of lands) .-- Hired-labor clearing operations
were continued. Establishment of a system of permanent bench-
marks above the proposed pool level was commenced. The follow-
ing costs were incurred during the fiscal year:
Clearing (hired labor) _______$----c___--                                   _---                              $132, 719. 33
Permanent benchmarks (hired labor)                              -     ---                                          3, 221. 47
   Lands.-Acquisition of lands required in connection with the proj-
ect were continued and 47,505.51 acres were acquired, the cost of
which was $359,266.83.
   Quarry.-Railroadconnection with the Great Northern Railroad
at Harlem, Mont., was established and a line extended to the Snake
Butte quarry, comprising a total main-line trackage of 77,234 feet
and 13,345 feet of sidetracks, the cost of which was $483,241.79.
Buildings, roads, power lines, and plant required for operations
were practically completed.      Preliminary drilling and blasting
operations were commenced.
   The cost of new work during the fiscal year was $7,520,511.08,
Public Works funds; $5,526,435.26, Emergency Relief funds; and
$12,501,371.85, regular funds; a total of $25,548,318.19. The total
expenditures were $8,547,499.21, Public Works funds; $3,353,680.68,
Emergenc9 Relief funds; and $12,446,881.05, regular funds; a total of
$24,348,060.94.
   Condition at end of fiscal. year.-Permanent work on the project
is approximately 71 percent complete. All preparatory work in the
          20196-37-pt. 1-               65
1024        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

nature of camp, roads, power lines, plant, shops, etc., is complete.
Dam: Clearing and grubbing, stripping base of dam, and construc-
tion of steel-sheet piling cut-off wall are complete. The river has
been diverted through the tunnels. The following quantities have
been placed:
                                                                                      Cubic yards
Hydraulic fill_ ___--------                                      ---------            61, 319, 200
Rolled fill   -------------------------------------------------                           224, 410
Gravel at toes of dam__--------------------__                   _______          __    2, 981, 041
Rock at toes of dam----------------------------------------                               286, 477
Gravel on upstream face of dam--------------------------------                            129, 240
Field stone on upstream face of dam________                         -________---          117, 024
   The dam proper has cost $25,923,744.89 to date and is 54 percent
complete.
   Diversion tunnels.-The four diversion tunnels having an aggre-
gate length of 24,386 linear feet are practically complete, with emer-
gency gates installed, except the main control gates, lights, and rail-
ing at the outlet, and the installation of the stand-by Diesel-electric
generator unit at the shafts. The tunnels and appurtenant works
have cost $26,607,442 and are 93 percent complete.
   Spillway.-The channel has been excavated, a total of 13,642,477
cubic yards having been removed, and 241,267 cubic yards of concrete
have been placed in the channel lining; 193,263 cubic yards of con-
crete have been placed in the bridge abutments, columns, piers, foun-
dation, floor slab, and training walls of the gate structure. Seven
gates have been erected. The operating equipment is in the process
of fabrication and assembly. The spillway has cost $14,510,552.43
and is 82 percent complete.
   Reservoir (exclusive of lands).-Surveys other than the establish-
ment of permanent benchmarks are complete. The establishment of
permanent benchmarks is 46 percent complete. Clearing operations
are 80 percent complete. The cost of the reservoir is $185,103.01 and
is 85 percent complete.
   Lands.--Appraisal of lands required for the project is complete
and 152,688 acres for the dam site and reservoir areas have been
acquired. The cost of land is $1,880,345.09 and is 63 percent com-
plete.
   Permanent buildings and utilities.-Twelve permanent dwellings,
administration building, and utilities are complete, the cost of which
was $570,591.75.
   The work remaining to complete the project consists of the com-
pletion of the work in progress, producing and placing paving stone
on the upstream slope of the dam, facing the downstream slope of
the dam, construction and placing the main control gates for the di-
version tunnels, and construction of a parapet wall along the crest of
the dam.
   The cost of new work under the existing project to June 30, 1937,
was $69,716,947.14, of which $39,454,416.99 were Public Works funds,
$16,208,104.72 were Emergency Relief funds, and $14,054,425.43
were regular funds. There were no maintenance costs. Expenditures
were $49,478,384.60 from Public Works funds, $18,111,081.04 from
Emergency Relief funds, and $13,571,089.55 from regular funds, a
total of $81,160,555.19.
              RIVERS AND HARBORS-FORT PECK, MONT., DISTRICT                                                                   1025
   Proposed operations--(a) Public Works funds.-The obligated
balance ($52,615.40) remaining from funds allotted will be applied
to the payment of outstanding liabilities.
   (b) Emergency Relief Appropriation Act of 1935.-The balance
unexpended ($388,918.96) and accounts receivable ($380.84) will be
applied toward the completion of the Fort Peck Dam and Reset-
voir. It is proposed to carry on operations during the fiscal year
1938, as follows:

                                                                                                       Estimated
                                                                                                      date of com-        Amount
                                                                                                         pletion


Accounts payable June 30, 1937_____L_________             .        ---                  ..- _
                                                                                _ _-_-----                               $290, 181. 3
New work (July 1, 1937, to June 30, 1938), construction of Fort Peck Dam and
  Reservoir, including all works incidental thereto:
   Proposed hired labor:
       Rock toes of dam (supply contract)        __-- ----------------------    Aug. 20,1937                               55, 673. 88
        Upstream facing field stone (supply contract)       --------------------Aug. 31, 1937                              43, 444. 54

            Total hired labor -                   _ _..                                                     99,118.42
                                                     -----------------------------------------.....------------
            Total            -------------------------------------------------------------                                389,299. 80



   (c) Regular fuinds.-The balance unexpended ($6,428,910.45) and
accounts receivable ($32,935.49) at the end of the year, together with
an allotment of $8,306,000 made during the fiscal year 1938, will
be applied toward the completion of the Fort Peck Dam and Reser-
voir. It is proposed to carry on operations during the fiscal year
1938, as follows:

                                                                                                     Estimated
                                                                                                       date of          Amount
                                                                                                     completion


Accounts payable June 30, 1937 --...................      ... ...         .              ._ $1, 915, 819 00
New work (July 1, 1937, to June 30, 1938), construction of Fort Peck Dam
and Reservoir, including all works incidental thereto:
   Existing contracts:
       Lined spillway channel and appurtenances ....          - -       -Aug.    31, 1937       742, 293.04
       Spillway gate structure....      ------------------------            Dec. 15,1937     1, 927, 925. 35
       Spillway-operating equipment        ----------------------------- July 15, 1938          427, 928. 79
              Total existing contracts- -...           ...............          -----------.....-                       3, 098, 147. !
                                                                                                                     -...........
    Proposed contracts:
        Main control gates for diversion tunnels (initial allocation) -..... _ June 30, 1938                            1, 000, 000. 00
    Proposed hired labor:
        Retrogression studies.....----       -------------             -               .             --   do-.......            500,00
        Gages and discharge observations_ ---                                                       -      --
                                                                                                      -do ....               4, 000.00
        Siltstudies ----------------------                                          --                    do.....            2,000.00
        Dredging, 1 year, 4 dredges, 6 months each (to move approximately
          24,000,000 cubic yards) .--               ----------------------------------
                                                  _-----                       --                        -do ....--.    5, 159, 176. 50
        Rolled fill ......      .. .. .. .. .. .. .. .. ..                                                do -....          94, 920.00
        Gravel toes of dam               _ -                                                      -   Aug. 31, 1937        630, 606. 68
        Rock toes of dam___                                                                           Aug. 20, 1937         73, 933. 29
        Upstream facing:
            Gravel blanket         _.__.----------------------                  ---                   June 30,1938         392, 559.00
            Field stone -       _ _ --                 --------------------------                     Aug. 31, 1937         63, 924. 58
            Paving stone-..........                                         --------------------      June 30, 1938     1, 535, 960. 00
        Stream diversion-drift booms ..-------------------------------                                Sept. 30, 1937        68, 472, 46
        Diversion tunnels-operation during construction, installation of
          standby Diesel electric generator, completion of lights and railing
          atoutlet- _____--.------
                                --_- - --                          --------                           June 30,1938         139,130.81
        Reservoir- clearing ..................-
                                     -..
                                   -...............                                        .......    Apr. 30, 1938         84, 000. 00
        Reservoir-permanent bench marks                                                               Sept. 30, 1937         7, 041. 53
       Acquisition of lands_                                                                          June 30,1938        497, 654. 91
                Total proposed hired labor                                               - -     -   --------          8, 753, 879. 76
                Total.                                                                                                14, 767, 845. 94
 1026             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   It is considered essential to complete the rock-and-gravel upstream
facing as rapidly as possible after the hydraulic fill has been placed.
Provided funds are made available during the fiscal year 1938, the
following additional work is considered advantageous:
Proposed hired-labor work:
     Upstream facing of dam:
         Gravel blanket    --------------------------------------                                       $104, 000
         Paving stone    ----------------------------------------                                        790, 000

                  Total-----------        --           -------------------------                         894, 000
   The additional sum of $10,800,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
MNew 'work     (July 1, 1938, to June 30, 1939) :
        Dredging, 1 year, 4 dredges, 6 months each (to move approxi-
          mately 15,000,000 cubic yards---------------------------      $5, 430, 000
        Upstream facing:
            Gravel blanket_---------------------_                           133, 000
            Paving stone, including parapet wall ------------------- 3, 855, 000
        Downstream facing__ --------------------------------------          186, 000
        Road along crest of dam-                                             8--------------____
                                                                             80,  000
        Diversion tunnels:
            Completion of main control gates--                    -----     591, 000
            Operation during construction------_---------                    25, 000
        Acquisition of lands-------------------------------------400,             000
        Contingencies, including demobilization                             1-----------------------100
                                                                                 00,000

             Total------------------ ---------------                               -       -          10, 800, 000
    It is estimated that at the end of the fiscal year ending June 30,
1939, all major construction will have been completed.
    In addition to funds required for work during the fiscal year 1939,
it is expected that approximately $1,578,000 will be required there-
after for the completion of the project. Provided funds are made
available, the entire dam and reservoir is expected to be in operation
by October 1939.
                                    Cost and financial summary

                             MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937___________________                                  -       $14, 054, 425.43
Cost   of     maintenance   to   Jun          14.17




       -Total cost of permanent work to June 30, 1937________                                   14, 054, 425. 43
Undistributed costs June 30, 1937 ---
                                   __--__         ___------                                      1, 399, 547. 63

       Net total cost to June 30, 1937__                                                         5, 453, 973. 06
                                                                                                1___________________
Plus accounts receivable June 30, 193.7                          --                                 32, 935. 49

       Gross total costs to June 30, 1937__ __                                                  15, 486, 908. 55
Minus accounts payable June 30, 1937_________________________                                   1, 915, 819. 00
      Net total expenditures___      -----------------                                          13, 571, 089. 55
Unexpended balance June 30, 1937___                                                             6, 428, 910. 45

             Total amount appropriated to June 30, 1937____________                             20,       000.   00
              RIVERS AND HARBORS-FORT PECK, MONT., DISTRICT                                                                      1027

   Fiscal year ending                        1933                1934                1935                1936                 1937
          June 30


Cost of new work------              --------------._____________
                                                             .-                _______________.     $1, 553, 053. 58      $12, 501, 371. 85
Cost of maintenance___
Total expended _---             _____.......____......___
                                                    __._       _.______                              1, 124, 208. 50       12, 446, 881. 05
Allotted---............--------------------------------.....----------------                        21, 000, 000. 00      -1,000, 000. 00


Balance unexpended July 1, 1936 ___________________-                                                _____        $19, 875, 791.50
Deductions on account of revocation of allotment                                                                    , 000, 000. 00
                                                                                                                   1------------
      Net amount to be accounted for__---,       _
                                           -----------                                                             18, 875, 791. 50
Gross amount expended ___________________ $14, 572, 948. 03
Less reimbursements collected__ $2, 116, 672. 86
Less receipts from sales--------      9, 394. 12
                                                   2, 126, 066. 98
                                                                                                                   12, 446, 881.05
      Balance unexpended June 30, 1937      __________________                                                         6, 428, 910. 45
Outstanding liabilities June 30, 1937___________ $2, 521, 857. 70
Amount covered by uncompleted contracts ---        3, 107, 017. 98
                                                                                                                       5, 628, 875. 68

     Balance available June 30, 1937--------            ----
                                                       __                                          -__ -_                800, 034. 77
Accounts receivable June 30, 1937_______________________                                                                  32, 935. 49

     Unobligated balance available June 30, 1937-----------                                                               832, 970. 26
Amount allotted during July 1937
                               -- _______ ____ __-____                                                                 8, 306, 000. 00
      Balance available for fiscal year 1938_________________                                                          9, 138, 970. 26
Amount (estimated) required to be appropriated for comple-
tion of existing project 1--_______________________                                                               12, 922, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work 1________ ________________-
                                                          -
                                                                                                                   10, 800, 000. 00
1 Exclusive of available funds.
                                                       PUBLIC WORKS             FUNDS


Cost of new work to June 30, 1937____________ ____________$39, 454, 416. 99
Cost of maintenance to June 30, 1937________
      Total cost of permanent work to June 30, 1937 .-------_ 39, 454, 416.99
Undistributed costs June 30, 1937_____________________--___-  10, 075, 826. 35

     Net total cost to June 30, 1937_____ _______-________-49, 530, 243. 34
Minus accounts payable June 30, 1937-----__________
                                          ----                      858.'74                                               .51,
     Net total expenditures    ____---_--__                                                                       49, 478, 384. 60
Unexpended balance June 30, 1937 ________________________ -_                                                           52, 615. 40
           Total amount appropriated to June 30, 1937-------------                                                49, 531, 000. 00

   Fiscal year ending                        1933                1934                1935                1936
          June 30                                                                                                             1937


Cost of new work------..
                ___ ..-                 -     -----           $957, 647. 87    $18, 991, 554. 63   $11,984, 703. 41        $7, 520, 511. 08
Cost of maintenance...---------------------------------------------
Total expended--------.......               -------          3,659, 557. 40     28,189, 902. 14      9, 081, 425. 85        8, 547, 499. 21
Allotted_ _------_-----_--__.           __--------          25, 000, 000. 00    25, 000, 000. 00     - 119, 000. 00         -350, 000. 00
 10O2         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936-------------------------$8,                                              950, 114. 61
Deductions on account of revocation of allotment ______--____                                            350, 000. 00
       Net amount to be accounted for----------------------                                          8, 600, 114. 61
Gross amount expended-------------------      - $9,489, 830. 79
Less:
      Reimbursements collected--_   $842, 034. 36
     Receipts from sales---------- 100, 297. 22
                                                    942, 331. 58
                                                                                                     8, 547, 499. 21

       Balance unexpended June 30, 1937----------------------                                              52, 615. 40
Outstanding liabilities June 30, 1937---------- ----------                                                52, 615. 40
                                          EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937 _________ -____                                    ___-        $16, 208,104. 72
Cost of maintenance to June 30, 1937____                                                         -------------
       Total cost of permanent work to June 30, 1937---------- 16,208, 104. 72
Undistributed costs June 30, 1937-----------------------___    2, 192, 776. 86
       Net total cost to June 30, 1937___--- -__-_18,                                                    400, 881. 58
Plus accounts receivable June 30, 1937      --------------                                        ------     380. 84

     Gross total costs to June 30, 1937_ -------                                   ____-__         18, 401, 262.42
                                    ------------
Minus accounts payable June 30, 1937_                                                ---------         290, 181. 38
     Net total expenditures_ --------------------        . 18, 111,081. 04
Unexpended balance June 30, 1937---------------------------   388, 918. 96

         Total amount appropriated to June 30, 1937 ----------                                     18, 500, 000. 00

   Fiscal year ending             1933              1934             1935                1936                  1937
         June 30

Cost of new work__-     ----------------
                            .            ----------------   _     $598, 776. 24    $10,082,893. 22        $5,526,435.26
Cost of maintenance...           -------------------------------------------------------------
                                                                        14,757, 400. 36 3, 353, 680. 68
Total expended........--------------------- -----------....................--------------...............
Allotted--..-----         ---------------- ---------------      15, 000, 000. 00     3, 500,000.00     -----



Balance unexpended July 1, 1936- ---                            ------                              $3, 742, 599. 64
                                                                                                _------

Gross amount expended_ --------..-.  -    __-_$5, 353, 736. 53
L,~s reimbursements collected------------      2,000, 055. 85
                                                                                                     3, 353, 680. 68
      Balance unexpended June 30, 1937___-----------------                                             388, 918.96
Outstanding liabilities June 30, 1937-------------------------                                         388, 918. 96

      Balance available June 30, 1937                        -------------------                 --------------
Accounts receivable June 30, 1937                                                                         380. 84

        Unobligated balance available June 30, 1937------------                                                380. 84

        CONSOLIDATED          COST AND FINANCIAL SUMMARY FOR FORT PECK PROJEOT

Cost of new work to June 30, 1937__-____-_---                               --               __.__$69, 716, 947. 14
Cost of maintenance to June 30, 1937-----------------                                          -------------
        Total cost of permanent work to June 30, 1937__-------_                                   69,716, 947. 14
Undistributed costs June 30, 1937-......-                            ----                       - 13, 668, 150. 84
        Net total cost to June 30, 1937-....------                                                 83, 385, 097. 98
           RIVERS AND HARBORS-FORT PECK, MONT., DISTRICT                                                            1029
Plus accounts receivable June 30, 1937___                                                                   $33, 316. 33

      Gross total costs to June 30, 1937- ___---------------                                          83, 418, 414. 31
Minus accounts payable June 30, 1.937--------------------                                              2, 257, 859. 12

     Net total expenditures_ ...... ___-__     ____--       81, 160, 555. 19
Unexpended balance June 30, 1937---------------------------- 6, 870, 444. 81
        Total amount appropriated to June 30, 1937-------------88, 031, 000. 00

  Fiscal year ending           1933              1934                  1935                 1936                 1937
        June 30

Cost of new work  ---- ----.   -   --         $957, 647. 87      $19, 590, 330. 87    $23, 620, 650. 21      $25, 548, 318. 19
Cost of maintenance-- ...          ----------------            ------...............----------------------------------
Total expended .-.-...----.----.-----..- 3, 659, 557. 40           28, 189, 902. 14    24, 963, 034. 71       24, 348, 060. 94
Allotted .......-- .-- ..--.-....---        25, 000, 000. 00       40, 000, 000.00     24, 381, 000. 00      -1, 350, 000. 00


Balance unexpended July 1, 1936 __---_--_------
                                    __---------               $32, 568, 505.75
Deductions on account of revocation of allotment-------------   1, 350, 000. 00

      Net amount to be accounted for__
                                     ------------------------                                         31, 218, 505. 75
Gross amount expended-__ ------- _--_---         $29,416,515.35
Less:
    Reimbursements collected___ $4, 958,763. 07
    Receipts from sales_---------   109, 691. 34
                                                   5, 068, 454. 41
                                                                                                      24, 348, 060. 94
      Balance unexpended June 30, 1937_---------------------                                              6, 870, 444. 81
Outstanding liabilities June 30, 1937---------- $2, 963,392. 06
Amount covered by uncompleted contracts---__-    3, 107, 017. 98
                                                                                                          6, 070, 410. 04

     Balance available June 30, 1937------------------------                                                800, 034. 77
Accounts receivable June 30, 1937----_______________________                                                 33, 316. 33

     Unobligated balance available June 30, 1937                              ------------                   833, 351. 10
Amount allotted during July 1937__________________-_____                                                  8, 306, 000. 00
     Balance available for fiscal year 1938------------------  9, 139, 351. 10
Amount (estimated) required to be appropriated for completion
of existing project ---------------------------------------- 12,922, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work 1- - - - -____
                                        -   - -- -   - -
                                          _____    _     ____ 10, 800, 000. 00
1Exclusive of available funds.

                       2. MILK RIVER, MONT., FLOOD CONTROL

   Location.-Milk River, an international stream, is formed by the
confluence of its north and south forks in the southeast portion of
the Province of Alberta, Canada, near the international boundary.
The two forks have their sources in the vicinity of St. Mary Lakes
 (headwaters of St. Mary River) in northwestern Montana, near
the Continental Divide, and flow in a general northeasterly direction
to their junction. The main stream flows southeasterly through
Alberta and Montana, a distance of 625 miles, to join the Missouri
River 1,866 miles above its mouth.
   Existing project.-The project provides for levees to protect people
and city property by the construction of new levees, enlargement
of existing levees, and the installation of flood gates to remove in-
1030                 REPORT OF CHIEF OF ENGINEERS. U. S. ARMY, 1937

terior drainage in the towns of Saco, Mont., located on Beaver Creek
about 33 miles above its confluence with the Milk River; Harlem,
Mont., located on the right bank of Thirty Mile Creek near its con-
fluence with the Milk River; and Glasgow, Mont., located on the
north bank of the Milk River below the mouth of Cherry Creek, a
tributary of the Milk River.
   The estimated cost, revised in 1936, is as follows:

                                                                                                                                        Con-      I ands
                                                      Location                                                                         tructioI     and          Total
                                                                                                                                        cost      damages


Saco   .--     --.   ...                 .                 ---       _                _-- .-           .-...       -   - -             $26,800      $5, 300          $32, 100
Harlem                     _                  .                                                                                          9, 030      4, 780           13, 810
Glasgow .....__            . __ .--          .----               .--------
                                                                    ------.....         .   ..        ......                            25, 800      2, 720           28,520
       Total-------------------------------                                                                                             61,630      12, 800           72, 430



   The project was adopted by the Flood Control Act, approved June
22, 1936 (H. Doc. No. 88, 73d Cong., 1st sess.), at a total estimate of
$62,300 for construction and $22,900 for lands and damages.
   Local cooperation.--See page 6. Local interests at Saco, Mont.,
and Glasgow, Mont., concur with proposed plan and will comply
with the conditions necessary to fulfill the requirements. Local inter-
ests at Harlem, Mont., do not concur with the proposed plan, nor
is it probable that any progress will be made to fulfill the require-
ments.
   Condition at end of fiscal year.-Work has not been started.
   Proposed operations.-Allotment of funds made during the fiscal
year 1938 will be expended to complete the work, as follows:

                                                                                                                                                   Esti-
                                                                                                                                                  mated
                                                             Location                                                                             date of      Amount
                                                                                                                                                  comple-
                                                                                                                                                    tion


New work (July 1, 1937, to June 30, 1938), construction of levees:
    Proposed contracts:
             Saco -_ -..--                        -    -         -       -   -    -     --.........            .             .......                             $26,800
             Glasgow-          - -........
                                       -       ..... __..-lasgow---------------------------------------
                                              --...          _ ...         - ......
                                                                   . .. ......   -     ...... . .. . ..- -..-..... ..                                                25,800
                                                                                                                                                                     25, 800
               Total               -----------------------------------------------------------------                                                                 52, 600



   Work at the locations listed will be completed at the end of the
fiscal year.
   No work is proposed during the fiscal year ending June 30, 1939, at
Harlem, Mont., unless additional authority is granted for revision of
the project.
  Status of reports called by river and harbor acts and committee resolutions

                                                                                      Date trans-Recommenda-
             Locality                        Authorization Act                        mitted to                        Document no.                           tion
                                                                                       Congress

Missouri River, devel-                   Senate      committee--
opment of power, Fort                     resolution, Jan. 15,
  Peck Dam and Reser-                        1937.
  voir.
        RIVERS AND HARBORS-NASHVILLE,                TENN., DISTRICT         1031
   IMPROVEMENT OF RIVERS AND HARBORS IN THE
           NASHVILLE, TENN., DISTRICT
  This district includes the entire drainage basins of the Cumberland
and Tennessee Rivers. The district embraces all except a very small
portion of eastern and middle Tennessee, a large portion of western
Tennessee, and portions of eastern and western Kentucky, western
North Carolina, southwestern Virginia, northern Georgia, northern
Alabama, and northern Mississippi.
  District engineer: Lt. Col. C. E. Perry, Corps of Engineers.
  Division engineer: Col. R. G. Powell, Corps of Engineers.
                                   IMPROVEMENTS

                                    Page                                      Page
1. Cumberland River, Tenn. and           5. Plant allotment -----------      1049
     Ky-     ___    _               1031 6. Cumberland       River  Basin,
2. Tennessee River, Tenn., Ala.,              Ky.-Flood control ------
                                                                     _       1049
     and Ky_------------------      1038 7. Shelby Park, Nashville, Tenn.
3. Examinations, surveys, and                               ------------
                                              (relief project)               1050
                             -
     contingencies (general) -
4. Other projects for  which no
                                    1047

     estimates are submitted--_     1048

                 1. CUMBERLAND RIVER, TENN. AND KY.

   Location.-This river is formed by the junction of Poor and
Clover Forks in Harlan County, Ky., about 687 miles above its
mouth, and flows west to Burnside, Ky., from whence it makes a loop
into Tennessee, passes Nashville, and returns to Kentucky, emptying
into the Ohio near Smithland, Ky. (See United States post-route
maps of Kentucky and Tennessee.)
   Previous projects-Below Nashville.-The River and Harbor Act
of July 3, 1832, made the first appropriation for this section of the
river, but the River and Harbor Act of March 3, 1871, was the first
to define a project for its improvement. The River and Harbor Act
of September 19, 1890, adopted a special project for the improvement
of the mouth of the river. The total cost and expenditure prior to
the adoption of present or canalization project in 1892 was $460,000,
all for new work. For further details see page 1901 of Annual
Report for 1915.
   Above Nashville.-Adopted by River and Harbor Acts of August
14, 1876, March 3, 1881, and July 5, 1884. The total cost and expend-
iture prior to the adoption of the present project in 1886 was $366,-
252.94 for new work. For further details see page 1898 of Annual
Report for 1915.
   Existing project-Below Nashville.-This provides for the con-
struction of six locks and dams (locks A to F), beginning with lock
A, 40.4 miles below Nashville, and ending with lock F, 147.4 miles
below Nashville, to secure 6-foot navigation at low water between
lock F and lock No. 1, the first lock constructed under the project for
the section of the river above Nashville. The project also provides
for surmounting dams A to F with movable crests.
   The construction of lock and dam no. 52, Ohio River, has created
a pool of more than 6-foot depth in the Cumberland River as far as
lock and dam F.
1032           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The following table shows the principal features of the locks and
dams included in the project:

                                                  Lock A                        Lock B                        Lock C


Nearest railroad station..---------- Fox Bluff, Tenn., at              Hickory Point, Tenn.,         Sailors Rest, Tenn.,
                                       station.                          2 miles.                       1 mile.
Distance above mouth of river....    150.6 miles       ..-----------   140.3 miles_-----------       108.5 miles.
Lock dimensions 1_.________          52 by 280 feet-..-......          52 by 280 feet----------      52 by 280 feet.
Lift above normal pool of dam 13.3 feet_                   _____       11.8 feet._______             12.3 feet.
below.
Depth on miter sills at normal 10.5 feet, upper--------                10.0 feet, upper--------      10.5 feet, upper.
  pool.                                110.3   feet, lower_-           10.3 feet, lower   -------
                                                                                               10.2 feet, lower.
Character of foundation                 Rock__-------_____
                                  ._______--                               ---------------
                                                                       Rock_                           ock.
Kind of dam      _____________          Fixed          _________       Fixed        _           __ Fixed.
Type of construction    2...........    Stone masonry lock,            Concrete lock, timber         Concrete lock, tim-
                                          timber crib dam.              crib dam.                     ber crib dam.
Placed in operation_______________      Nov. 26,1904____... Nov. 9, 1916______ __--               Sept. 2, 1918.
Cost of lock and dam ____________       $490,010.77.........-----------. $679,682.93_ _-----------$721,381.33.


                                                 Lock D                         Lock E                        Lock F


Nearest railroad station _---------     Bear Spring, Tenn.,            Cadiz, Ky., 12 miles___ Eddyville, Ky.,           at
                                    53%miles.                                                  station.
Distance above mouth of river ... 88.0 miles ..-----------             66.3 miles-....--.... 43.6 miles.
Lock dimensions 1          .......
                           --..         52 by 280 feet--
                                       ._                      __      52 by 280 feet         ..--------
                                                                                                      52 by 280 feet.
Lift above normal pool of dam           10.9 feet___________           10.1 feet.   ______       _   11.5 feet.
below.
Depth on miter sills at normal f10.3 feet, upper_                      10.7 feet, upper__       _    10.6 feet, upper.
pool.                                   110.3             -
                                            feet, lower .....                           ... . 12.4 feet, lower.
                                                                       10.6 feet, lower--
Character of foundation     ...          Rock 3
                                   - -____             ________        Rock 3--------------   Rock.3

                         -------
Kind of dam___________ __------
Type of construction 2
                                        Fixed_____________
                                        Concrete lock, timber
                                          crib dam.
                                                                       Fixed ______________
                                                                       Concrete lock, timber
                                                                         crib dam.
                                                                                                     Fixed.
                                                                                                     Concrete lock, tim
                                                                                                      ber crib dam.
                          _______ Dec. 21,1916 ......---------
Placed in operation .......                                    Nov. 20, 1922__________               Nov. 1,1923.
                                            ........... $1,075,810 .. ___________
Cost of lock and dam _-----------$629,254.94-----------                                              $1,110,743.30.


  IClear
  2
         width and length available for full width.
   With concrete cap and movable crest.
  Y   Abutment founded on piles; dam partly on rock and partly on gravel.

   The extreme fluctuation in the stage of the river varies from
about 31 to 56 feet at different localities. Fluctuations below extreme
high water are so variable that it is impracticable to fix the stage
commonly referred to on other streams as ordinary high water.
   The estimate of cost for new work for the section below Nashville,
revised in 1935, was $4,832,448, excluding amounts expended on pre-
vious projects, and $632,000, chargeable to maintenance work. The
estimate of annual cost of operation and maintenance, made in 1909,
is $40,000.
   The existing project for the section below Nashville was authorized
by the following river and harbor acts: The act of July 13, 1892, pro-
vided for lock A (Annual Report for 1890, p. 2151) ; the act of June
25, 1910, provided for locks B to F, and for the dredging below lock
F (H. Does. Nos. 758, 60th Cong., 1st sess., and 1481, 60th Cong., 2d
sess.). For map see House Document No. 1481, Sixtieth Congress,
second session, page 8.
   The surmounting with movable crests of existing dams A to F,
inclusive, and repairing same, was authorized by the Public Works
Administration September 6, 1933, and the River and Harbor Act of
August 30, 1935 (H. Doc. No. 38, 73d Cong., 1st sess.).
   Above Nashville.-This provides for the construction of locks and
dams nos. 1 to 17 and no. 21 to secure 6-foot navigation at low water
from Nashville (191.0 miles above the mouth) to Waitsboro Shoals
(322.0 miles) and 4-foot navigation from Waitsboro Shoals to Burn-
             RIVERS AND HARBORS-NASHVILLE,                                                       TENN., DISTRICT                         1033
side (3 miles). The project also provides for the periodic removal of
snags and similar obstructions from Nashville to Burnside (325.0
miles). The project as modified by River and Harbor Act of July 3,
1930, further provided for raising dam no. 1 by 3 feet (Rivers and
Harbors Committee Doc. No. 26, 70th Cong., 2d sess.). The following
table shows the principal features of the locks and dams included'in
the project:

                                     Lock no. 1                    Lock no. 2                        Lock no. 3                   Lock no. 4

Nearest railroad sta- Nashville, Tenn., Madison, Tenn., Hendersonville,                                                    Gallatin, Tenn., 5
  tion.                     2 miles.                  1 miles.                   Tenn., 3 miles.                             miles.
Distance above mouth 188.4 miles........ 201 miles---.......... 218.1 miles- ......                                        237 miles.
  of river.
Lock dimensions 1...... 52 by 280 feet-...... 52 by 280 feet--..... 52 by 280 feet-.....                                   52 by 280 feet.
Lift above normal pool 5.5 feet........_... 8 feet.....-........ 12.1 feet------...........                                12.3 feet.
  of dam below.
Depth on miter sills at f9.5 feet upper-           6.5 feet upper_ _-         6.6 feet upper.....                          7 feet upper.
  normal pool.          110.5 feet lower- ...      9.5 feet lower--..... 6.5 feet lower-......                             6.6 feet lower.
Character of founda- Rock...-......            -.. Rock.........-----------. Rock_.............                            Rock.
  tion.
Kind of dam _________ Fixed-.--------- Fixed..                     ..----------Fixed. _-----__.                            Fixed.
Type of construction -- Stone masonry Stone masonry Stone masonry                                                          Stone nasonry
                            lock, 2timber crib        lock, timber crib          lock, timber crib                           lock, timbr crib
                            dam.                      dam; concrete              dam; concrete                               dam; concrete
                                                      cap.                       cap.                                        cap.
Placed in operation -.- Nov. 26, 1904_.._.. Oct. 9, 1907........ Oct. 15, 1908__......                                     Nov. 17, 1909.
Cost of lock and dam_ $395,634.45 ........         $340,241.65...... $348,354.46-.......-                                  $346,429.99.   :

                                     Lock no. 5                     Lock no. 6                       Lock no. 7                   Lock no. 8

Nearest railroad sta-            Lebanon, Tenn.,               Hartsville, Tenn.,             Carthage, Tenn.,             Carthage,      Tenn.
  tion.                            10 miles.                    4 miles.                        8 miles.                     5 miles.
Distance above mouth
  of river.
                                 264.7 miles -  -------        281.6miles    ..-..
                                                                              -               299.7 miles  -   ----        317 miles.
Lock dimensions 1 ....           52 by 280 feet- .....         52 by 280 feet-....--          52 by 280 feet.---..         52 by 280 feet.
Lift above normal pool                       ___
                                 11.7 feet .-..-               12 feet..-----------....       12 feet----.......---.....   12.6 feet,
of dam below.
Depth on miter sills at         f6.6 feet upper- ....           6.6 feet upper-.... 6.6 feet upper-__                      6.7 feet upper.
  normal pool.                  17 feet lower---_              6.6 feet lower-..--- 6.6 feet lower------                   6.7 feet lower.
Character of founda-                    ........
                                 Rock-__-                     - Rock............. Rock----.......      ...                 Rock.
  tion.
Kind of dam-_....__...  Fixed .__......._  .                   Fixed ....- ___.... Fixed..___...___.....                   Fixed.
Type of construction__  Stone masonry                          Stone masonry Stone masonry                                 Concrete lck;,tim-
                          lock, timber crib                      lock, timber crib             lock, timber crib            ber crib dam.
                          dam; concrete                           dam; concrete                 dam; concrete
                          cap.                                    cap.                          cap.
Placed in operation_--  Oct. 18, 1909 .... _                   Oct. 21, 1910 -___ Oct. 18, 1910....__                      Sept. 15, 1924.
Cost of lock and dam__- $373,590.40.-.....                     $369,357.48---------......... $378,568.15-.......           $680,915.21.

  1 Clear width and length, available for full width.
  2 With concrete cap and movable crest.




                                      Lock no. 9                    Lock no. 10                      Lock no. 11                  Lock no. 12

Nearest railroad sta-            Gordons v ille ,              Double Springs,                Double Springs,              Livingston, Tern.,
  tion.                            Tenn., 12 miles.              Tenn., 19 miles.               Tenn., 20 miles.             19 miles.
Distance above mouth             331.6 miles- .......          348.3 miles-----........       364.5 miles--                382.9 miles.
  of river.
Lock dimensions 1 ..             52 by 280 feet-......         52 by 280 feet--.....          52 by 280 feet---... 52 by 280 feet.
Lift above normal pool           12.75 feet...---...---....    12.75 feet...-------..         12.75 feet---------. 12.75 feet,
  of dam below.
Depth on miter sills at          6.5 feet..--------........    6.5 feet-------..........      6.5 feet----------....       6.5 feet.
  normal pool.
Character of founda-             Rock..............            Rock..............             Rock---------_....           Rock.
  tion.
Kind of dam.__--------           Fixed----.............        Fixed-------............. Fixed----------. Fixed.
Type of construction--           Concrete lock,                Concrete lock, Concrete lock, Concrete lock, tim-
                                   timber crib dam.              timber crib dam.         timber crib dam.  ber crib damin.
Year completed------........)      )----------------                                          ()--              --           ).
Estimated cost
          3    of lock           $780,500-...........          $756,500---------...........   $735,500---------..          $764,000.
and dam.

  See footnotes at end of table.
1034          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                      Lock no. 13                                  Lock no. 14                     Lock no. 15


Nearest railroad station___ Livingston,         Tenn.,            29   Livingston,       Tenn.,        35   Glasgow, Ky., 38 miles.
                              miles.                                     miles.
Distance above mouth of       396.8 miles -------------                419.3 miles------------              437.8 miles.
river.
Lock dimensions 1_       _    52 by 280 feet--------.   52 by 289 feet .......... 52 by 280 feet.
Lift above normal pool of     12.75 feet -------------- 12.75 feet-------------12.75 feet.
  dam below.
Dep th -on miter sills at     6.5 feet __-.-.... ..        ...-        6.5 feet_                            6.5 feet.
  normal pool.
Character of foundation___    Rock-_ .-----------.. -.                 Rock----------------                 Rock.
Kind of dam...-------------   Fixed ...------------..----              Fixed ....                           Fixed.
Type of construction-__-_     Concrete lock, timber Concrete lock, timber                                   Concrete lock,       timber
                               c r i b d a m -.. . . . . . . . . . . . c r i b d a m . - -.                  c r ib d am .
              .....----
Year completed-----           (                                        (()------                            ().
Estimeted cost of lock        $766,000_..--------------
                                              .                         749,000                  ---        $784,000.
and dam.


                                      Lock no. 16                                  Lock no. 17                     Lock no. 21


Nearest railroad station___   Burnside, Ky., 35 miles_                 Burnside, Ky., 28 miles_             Burnside, Ky., 29 miles.
Distance above mouth of       460.6 miles              -     -         471.8 miles_                         487.3 miles.
river.
Lock dimensions 1 -_._        52 by 280 feet ...........               52 by 220 feet ...-.......           52 by 2804 feet.
Lift above normal pool of     12.75 feet_                              12.75 feet         __                14 feet.
dambelow.
Depth on miter sills at       6.5 feet---------------6.5 feet                                               6.5 feet.*
normal pool.
Character of foundation.__    Rock .           ___________                -------------------- Rock.
                                                                       Rock
Kind of dam.._________        Fixed_                                   Fixed_                  Fixed.
Type of construction-....-    Concrete lock, timber                    Concrete lock, timber                Concrete.
                               crib dam.                                crib dam.
Year completed------      . (2)                                    _   (2)._                                Oct. 20, 1911.
Estimated
       3  cost of lock and $718,000._                                  $877,000_       ___   ___            $361,498.20.6
  dam.

  1 Clear width and length, available for full width.
  2   Construction not yet commenced.
  3 Estimate made in 1919.
       feet above low water, open river.
  4 19.5
  6 Low water in the open river gives only 1 foot on the lower miter sill.
  6 Actual cost.


    The extreme fluctuation in the stage of the river varies from about
47 to about 71 feet at different localities. Fluctuations below
Setremne high water are so variable that it is impracticable to fix the
stage commonly referred to on other streams as ordinary high water.
   The estimated cost for new work for the section above Nashville,
revised in 1930, is $10,575,183.24. This includes the estimate for
lock and dams nos. 1 to 7 and 21, $2,861,683.24 (already completed),
and $7,688,500 for locks and dams nos. 8 to 17, and $25,000 for raising
dam no. 1, in accordance with River and Harbor Act of July 3, 1930.
The estimated cost each of locks and dams nos. 9 to 17 is given in the
table above. The estimate of annual cost of operation and care of
locks and dams included in both sections, made in 1936, is $205,000.
    The estimated cost of snagging operations is $5,000 per annum.
    The existing project for the section above Nashville was adopted
by River and Harbor Act of August 5, 1886 (Annual Report for
-4884,.p. 1663), which provided for locks and dams. This report left
the final plan of improvement to the Secretary of War. The dimen-
sions of the locks were fixed in accordance with reports of March 30,
1887, and November 25, 1890 (Annual Reports for 1888, p. 1622,
and 1892, p. 1933). The River and Harbor Act of March 2, 1907,
which adopted the report of the Board of Engineers, dated Febru-
ary 26, 1906 (H. Doe. No. 699, 59th Cong., 1st sess.), limited the lock
and dam construction to locks and dams nos. 1 to 7 and 21. The
River and Harbor Act of March 2, 1919, made provision for locks and
           RIVERS AND HARBORS-NASHVILLE,             TENN., DISTRICT   1035
dams nos. 8 to 17 (Rivers and Harbors Committee Doc. No. 10, 63d
Cong., 2d sess.). The River and Harbor Act of July 3, 1930, provided
for raising dam no. 1 three feet (Rivers and Harbors Committee Doc.
No. 26, 70th Cong., 2d sess.).
  Operation and care of the locks and dams were included in the
Project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26 1934. The latest published
map is in House Document No. 740, Sixty-third Congress, second
session.
   Terminal facilities.-At Nashville, Tenn., there is a five-story ter-
minal building 300 feet long and 140 feet wide, built of reinforced
concrete, having large and convenient loading platforms. At Clarks-
ville, Tenn., there is a warehouse with incline tramway. At Dover,
Tenn., there are two warehouses with inclined tramways. At Burn-
side, Ky., there are two warehouses with tramways and one railway
incline. At Carthage, Tenn., there is a railway incline and a belt
conveyor. In addition to the foregoing there are many unimproved
private landings along the river, at a number of which are sheds or;
warehouses without regular attendants, where the owners receive
and care for freight at reasonable charges.
                 OPERATIONS   AND RESULTS DURING FISCAL YEAR


   (a) Cumberland River below Nashville, Tenn.-None.
   (b) Cumberland River above Naschville, Tenn.-None.
   (c) Cumberland River-Mai tenance (operating and care).-
The 15 locks were operated; dwellings, grounds, locks, and ap-
purtenances were cared for; andl snags and other obstructions were
removed from the channel. Dredging operations were carried on
with Government plant in various pools, and 32,415 cubic yards of
sand and gravel were removed. Installation of barge haulage units,
electric alarm systems and flood lights at locks 1, D, and F, was
completed.
  A contract was entered into for dredging approximately 201,000
cubic yards of sand and gravel between miles 211 and 309. The
contract was about 23 percent completed at the end of the fiscal year,
46,317 cubic yards having been dredged.
  The total costs of operating and care work for the fiscal year
under regular funds were $332,899.13 and the expenditures were,
$338,119.77.
                      CONDITION   AT END   OF FISCAL YEAR


   (a) Cumberland River below Nashville, Tenn.-All locks and dams
under the existing project have been completed, affording full project
depth between the mouth and Nashville.
  The total costs and expenditures for this section were $4,997,-
767.83, including $685,000 from Public Works funds. Of this amount,
$4,938,698.41 was for new work, and $59,069.42 for maintenance.
   (b) Cunm berland River above Nashville, Tenn.-Under the existing
project, locks and dams nos. 1 to 8, inclusive, and no. 21 have been
completed. The project as a whole is about 40 percent completed.
For details of these locks and dams see tables under paragraph
"Existing project."
  The locks and dams provide, at extreme low water, a navigable
channel 6 feet deep from lock 1 (2.6 miles below Nashville) tc
t3       'I~REPORT OF CHIEF. OF ENGINEERS, U. S. ARMY, 1937

WIiagara Shoals (140.6 miles above Nashville) ; 6 feet deep from lock
21 'to Waitsboro Shoals (25 miles); and 4 feet deep from Waitsboro
Shoals to Burnside, Ky. (4 miles). The expenditures for mainte-
napce have kept the channel above Nashville fairly free from snags
aid surface obstructions. The depth at extreme low water over
the sholest part of the reach between the head of pool, lock and dam
io: 8,and lock no. 21 (55 miles in Tennessee and 101.9 miles in Ken-
tucky) is about 0.5 foot. In this section 3-foot navigation is prac-
tically certain from February 1 to May 1, and usually possible from
January 1 to June 1. Four-foot navigation is usually possible from
Vebruary 1 to May 1, but no period can be fixed during which it is
reasonably certain. Navigation for vessels drawing over 4 feet is
uncertain at all times. When the Celina gage reads 1 foot, 16-inch
navigation is practicable, and for each additional foot of reading on
this gage the navigable depth is increased 0.8 foot. There remains
to complete the project the construction of locks and dams 9 to 17,
inclusirve.
    The total cost and expenditure for this section was $3,831,861 of
which $3,725,791.43 was for new work and $106,069.57 for mainte-
nance.
   (c) Operating and care of locks and dams.--Locks A and no. 1
were operated under the permanent indefinite appropriation from
July 1, 1905. Locks B to E and nos. 2 to 7, inclusive, have been so
operated since the dates of their iespective completion (see tables
under paragraph "Existing project"); lock F has been so operated
since January 1, 1925; lock no. 8, since July 1, 1925; and lock no. 21,
slih.e October 20, 1911. Operations were conducted under this ap-
propriation to the end of the fiscal year 1935.
i The total cost to June 30, 1937, for operating and care from main-
teinaace and improvement funds was $419,585.64. The total expen-
diture. was $426,953.30.
   The total cost under the existing project for the entire stream was
$,,24,21.47, of which $8,664,489.84 was for new work, including
$085,000 Public Works funds, and $608,068.05 for maintenance, in-
clhding $419,585.64 for operating and care.
   The total expenditure was $9,256,582.13, of which $8,571,582.13
was from regular funds and $685,000 from Public Works funds.
    In addition the sum of $3,266,705.82 was expended between July 1.
1905, and June 30, 1935, on the operation and care of the works of
improvement under the provision of the permanent indefinite ap-
propriation for such purposes.
   Peoposed operations-Regularfunds.-The balance unexpended, in-
cluding accounts receivable at the end of the year, together with an
allotment of $230,000 made during July 1937, will be applied as
follows:
Maintenance: Operating and care of locks and dams (July 1, 1937-
  June 30, 1938)
    Accounts payable, June 30, 1937_________________________      $15, 908. 22
    Operation of locks and dams and other works_____------__      110, 410. 00
    Ordinary maintenance and repairs___________________________    57,060.00
     Improvements and reconstruction ________________________      42,100. 00
     C;hannel work .........             ------ ___                 -_   59, 468. 81
     ;Special work (stream gaging)             _ __------_                7, 200. 00
     !   otal-----           -       -       -   ___   --   _292,           147. 03
              RIVERS AND HARBORS-NASHVILLE,                                             TENN., DISTRICT                    1037
   The additional sum of $376,000 can be profitably expended during
fiscal year 1939, as follows:
Operating and care of locks and dams (July 1, 1938-June 30, 1939) :
   Operation of locks and other works-------------------- -------- $110, 000
   Ordinary maintenance and repairs ------------------               75, 000
   Improvements and reconstruction       --------------------------- 80, 000
   Channel work-------------------------------------------------93, 000
   Stream gaging------------------------------------------------     18, 000
           Total----------------- -------------------------------------                                                  376.00

                                              Cost and financial summary

Cost of new work to June 30, 1937---------------------------                                                   $9, 490, 742. 78
Cost of maintenance to June 30, 1937-------------------------                                                  2 3, 874, 773. 87

      Total cost of permanent work to June 30, 1937------------13, 365, 516. 65
Undistributed costs June 30, 1937-----------------------------       -- 164. 15

      Net total cost to June 30, 1937                                                                           3, 365, 352. 50
                                                                                                               1--------------------------
Plus accounts receivable June 30, 1937------------------------96.                                                              61

      Gross total costs to June 30, 1937---------------------                                                  13, 365, 449. 11
Minus accounts payable June 30, 1937-------------------------                                                       15, 908. 22

     Net total expenditures__---------------------------------                                                 13, 349, 540. 89
Unexpended balance June 30, 1937- -------------------------                                                          2, 050. 42

           Total amount appropriated to June 30, 1937--------------                                            13, 411, 591. 31

     Fiscal year ending June 30                  1933                  1934            1935             1936              1937


Cost of new work----------------_                    $5.51    -                     $521,875.90     $163, 124. 10
Cost of maintenance---...---.-..               181, 563. 18        $238, 763. 72     199, 838.71     143, 331. 85       $332, 899. 13
        Total cost--.......----..----------    181, 568. 69         238, 763. 72     721, 714. 61    306, 455. 95        332, 899. 13
Total expended----------------.....            180, 953. 81         321, 048. 82     576, 709.07     340, 324. 51        338, 119. 77
Allotted..----------------------               163, 855. 65       1, 015, 907. 92    313, 300. 00    97, 003. 72         160, 000. 00


Balance unexpended July 1, 1936_ - -  _---- -                                                                       $240, 170. 19
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_--                                                                                              160, 000. 00

      Amount to be accounted for_                                                                                    400, 170. 19
Gross amount expended____----- ______________         $393, 612. 87
Less:
    Reimbursements collected--------- $55, 213. 10
    Receipts from sales-__ ____-         -    280. 00
                                                        55, 493. 10
                                                                                                                     338, 119. 77
      Balance unexpended June 30, 1937-------------                                                                   62, 050. 42
Outstanding liabilities June 30, 1937_ _____--____ $12,329.08
Amount covered by uncompleted contracts-- -------    3, 437. 33
                                                                                                                      75. 766. 41
     Balance available June 30, 1937--------------------------13,                                                         715. 9
Accounts receivable June 30, 1937- -----------------                                                                       96.61
     Unobligated balance available June 30, 1937 --------------                                                       13, 619. 38
Amount allotted during July 1937-----------------------------                                                        230, 000. 00
            Balance available for fiscal year 1938----------------                                                   216, 380.62
    'Includes
    2 Includes
                $685,000 Public Works funds.
             $1,266,705.82 operation and care permanent                                    indefinite    appropriation,          and
$23,343.42 adjustment of previous year's cost.
1038      REPORT OF CHTEF OF ENGINEERS, U. S. ARMY, 1937

Amount (estimated) required to be appropriated for completion
of existing project ---------------------------------------- $7, 970, 000

Amount that can be profitably expended in fiscal year ending June
                             --------- ----- -- -           - -
30, 1939; for maintenance 3                ________    _____    ___                  376, 000
SExclusive   of'ailable a funds.

                2. TENNESSEE RIVER, TENN., ALA., AND KY.

   Location.-The Tennessee River is formed by the junction of the
French Broad and the 1Holston Rivers in eastern Tennessee, 4.4 miles
above the Gay Street Bridge at Knoxville, flows southwest into north-
ern Alabama, thence in a generally westerly course across north
Alabama, and from the northeast boundary of Mississippi nearly due
north across Tennessee and Kentucky, entering the Ohio River at
Paducah, 652.1 miles from the junction of the French Broad and
Holston Rivers. See United States post-route maps of Kentucky
and Tennessee. For description of the river see page 1202, Annual
Report for 1932.
   Previous projects.-(A) Above Chattanooga: Adopted by the
River and Harbor Acts of August 30, 1852, June 10, 1872, August
18, 1894, and July 25, 1912.
   (B) Chattanooga to Riverton: Adopted by the River and Harbor
Acts of August 30, 1852, July 25, 1868, March 3,1871, September 19,
1890; acts of April 26, 1904, and January 7, 1905; and River and
Harbor Acts of March 2,1907, June 25, 1910, July 25, 1912, July 27,
1916, and March 3, 1925.
   (C) Below Riverton: Adopted by the River and Harbor Acts of
July 25, 1868, September 19, 1890, August 18, 1894, March 3, 1899,
and July 25, 1912.
   The costs were as follows:
Projects 1852, 1872, 1894, id 1912, above Chat-
  tanooga:
    New work..---------------------------------- $2, 350, 128. 26
    Maintenance         --                                     207, 578. 10
                                                                    -_ -       $2, 557, 706. 36
Projects 1852 and 1860 for work between Knoxville and Kellys
  Ferry : New work --------------------------------------------                     51, 406. 94
Projects 1868, 1871, 1890, 19:04, 1907, 1910, 1912,
  1916 and 1925, Chattanooga to Riverton:
    New work--__ _________-----------------                 $9,984,016.07
    Maintenance --- ___                 _-----------           419, 575. 70
                                                                               10, 403, 591. 77
Projects 1868, 1890, 1894, 1899, and 1912, below
  Riverton :
    New work                        -------------------     $1, 621, 641. 39
    Maintenance----------------                 ---------      488, 872. 27
                                                                               2, 110, 513. 06

       Total for all previous projects (new work, $14,007,192.66,
        and maintenance, $1,116,026.07)    ------------------- 15, 123, 218. 73
  The expenditures have been $15.708;974.35.
  For further details see pages 1902 to 1906 of Annual Report for
1915, and pages 1190-1194, 1196-1216, and 1220-1222, Annual Report
for 1929.
  E.isting project.-This provides for a channel 9 feet deep at low
water from the mouth to Knoxville, Tenn., a distance of 647.7 miles,
       RIVERS AND HARBORS-NASHVILLE, TENN., DISTRICT            1039
to be obtained by the construction of low dams; provided, that under
the provisions of the Federal Water Power Act a high dam with
locks may be substituted for any two or more of the low dams and
built by private interests, States, or municipalities; and provided
further that in case high dams are built before the United States
shall have built the projected locks and low dams which are to be
replaced, the United States shall contribute to the cost of the sub-
stituted structures an amount equal to the estimated cost of the
works of navigation for which substitution is made.
   The total number of low navigation dams now included in the
project is 19 (exclusive of those already built under former projects
and those eliminated by the construction of high navigation power
dams at the Pickwick Landing site, mile 206.7, General Joe Wheeler
site, mile 274.9, Guntersville site, mile 349.0, and the Chickamauga
site, mile 471.0.)
   The following table contains information concerning various fea-
tures of the proposed locks and low dams and such existing locks and
dams as are included in this project:




     20196-37--pt. 1--66
                                                                                                                                                                                                                                      00
                               I                              Location                                                                                                  Lock                                                           oP
                                                                                             i

                                                                                                                                              Pool elevation
                                                                                                          Dimensions                           above mean
                                                                                                                                                 sea level                                    Per-
      Name of project              Miles                                                                                                                                                     cent-         Year    Estimated
                                   above           Distance from nearest town, or mouth of                                                                                Character of                   opened or actual cost
                                                             navigable tributary                     Widthof      Length                                                  foundation         age of      to navi- of each lock
                                   mouth                                                                           avail-                                                                   comple-                                   0
                                                                                                       of           able         Lift        Lower         Upper                              tion        gation   and dam            rN
                                                                                                      cha-        for full
                                                                                                      ber          width
                                                                                                                                                                                                                                      H
                                             I..                                                 I            I              I--
                                                                                                                              1-----    -r   --       -             i          I




                                                                                                      Feet          Feet         Feet             Feet     Feet                                                                       O

Aurora Landing ...........           42. 211.2 miles above Birmingham, Ky...........                    110         600            13             302      315     Hard gravel-__ __             (1)       (1)  $2, 750,000.00
White Oak Island-..........          83. 352.3 miles above Birmingham, Ky..........                     110         600            13             315      328    .. ..do _.--------             (1)       (1)   2,735,000.00
Perryville .... ............        136. 1At Perryville, Tenn..........__...                            110         600            15             328      343     _.... do.........     ..      (1)       (1)   2, 960, 000. 00
Wolf Island-----------------        192. 02.2 miles above Savannah, Tenn-...........                    110         600            10             343      353      -- do ._........             (1)       (1)   2, 420, 000.00
Big Bend Shoals _____.... --        204. 62.3 miles above Hamburg, Tenn ..........                      110         600            14             353      367     Rock- __........              (1)       (1)   2, 620, 000.00        0
Pickwick Landing 23 .......         206. 74.4 miles above Hamburg, Tenn............                     110         605. 3       4 61             352      413    -... do ............            (5)          6 4, 858, 982. 00       z
Colbert Shoals Canal........        226.8 0.9 mile above Riverton, Ala_ _______                         110         600            23. 6          367      390. 6 --- do          -....-......    (1)            3, 391, 000.00
Head Colbert Shoals-......          234. 68.7 miles above Riverton, Ala.-                               110                        13.4           390. 6                                -----              (1)
                                                                                                                    600                                    404     ---do
                                                                                                                                                                     ..       ...-               (1)             2, 665, 000. 00
Lock and dam no. 1...._____-        256. 80.3 mile above railroad bridge at Florence,                    60         298. 5         12. 1          404      416. 1 Limestone (Lau-                  100     1926 7989, 215. 25
                                             Ala.                                                                                                                      derdale chert).
Wilson Dam (dam no. 2)-....         259.4 2.9 miles above Florence, Ala................                  60         297. 5
                                                                                                         60         300          8 89             416. 1   505. 1 -_. _do.............             100     1927 746, 666, 647. 65
General Joe Wheeler Dam             274.9 18.4 miles above Florence, Ala-..............                  60         360. 5         49. 9          505. 1    555     Rock.............            (11)      1934 121,721, 219. 06
  (dam no. 3). o10
                                                                                                                                                                                                                                       z
                                                                                                                                                                                                                                       M


Lock B......----------...........-------
                                   285.1  19.4 miles below Decatur, Ala_............._                  110         600                10         520       530         do ............ (1)
                                                                                                                                                                    --...                                  (1)      1,488,000.00
Milton Bluff................       287. 7 16.8 miles below Decatur, Ala...............                  110         600                11         530       541     ....do--.......... (1)                 (1)      3, 195, 000. 00
Indian Creek Bar ..........        321.2  16.7 miles above Decatur, Ala-..............                  110         600                 7         541       548       ..do ............ (1)                (1)      2, 200, 000. 00
Guntersville 2 13______________    349.0  9.1 miles below Guntersville, Ala..........                    60         358. 8             39         555       594         do ............ (14)                      6 2, 951, 000. 00
Beards Reef.........------------.. 355.8 2.3 miles below Guntersville, Ala-........                     110         600                16         548       564    ----do-_------------ (1)                (1)      2,890,000.00           /2

    I Proposed dam, no work performed; estimated cost.
    2 Lock and dam under construction by Tennessee Valley Authority.
    3 Will submerge existing Riverton Lock and Colbert Shoals Canal and eliminate Colbert Shoals Canal and Head Colbert Shoals low-dam projects.
    4 Above low water.
    5Lock 98 percent completed; dam 40 percent completed.
    6 Estimated cost of lock only.
    ?SActual   cost of lock and dam.
       Flight of 2 locks, authorized under sec. 124, National Defense Act of June 3, 1916 (H. Doec. No. 1262, 64th Cong., 1st sess.).
     0 Dam under construction by Tennessee Valley Authority.
   10oWill submerge existing locks nos. 1 and 2 of Muscle Shoals Canal, locks A and B of Elk River Shoals Canal, and eliminate lock B, Milton Bluff and Indian Creek Bar low-
dam projects.
   11Lock opened to navigation Nov. 27, 1934, 100 percent completed; dam 98 percent completed.
   12Actual cost of lock only.
   13Will submerge existing Widows Bar lock and dam and eliminate Beards Reef, Mink Creek, and Bellefonte low-dam projects.
   14 Lock 95 percent completed; dam 18 percent completed.
                                                                   Lci                                                                                                               Lock
                                                                   Location                                                                                                          Lock
                                                                                                      i


                                                                                                                                                           Pool elevation
                                                                                                                   Dimensions                               above mean
                                                                                                                                                              sea level                                         Per-
       Name of project                  Miles                                                                                                     I                                                            cent-
                                                                                                                                                                                                                        Year    Estimated
                                        Mlabove Distance from nearest town, or mouth of                                                                                                   Character of                opened or actual cost
                                        mouth             navigable tributary                             Width Length
                                                                                                                avail-                                                                     foundation          age of to
                                                                                                                                                                                                              comple-
                                                                                                                                                                                                                         navi- of each lock
                                                                                                            of   able
                                                                                                          cham- for full
                                                                                                                                         Lift         I Lower          Upper                                    tion   gation    and dam
                                                                                                                                                                                                                                                     0   H
                                                                                                           ber  width
                                    I             i                                                   i            i         --   i--     --      i--



                                                                                                           Feet        Feet              Feet               Feet     Feet
Mink Creek...__________........          374. 2       16.1 miles above Guntersville, Ala..........           110       600                11                564      575     Rock..............  (1)                     (1)    $2, 415,   000. 00
Bellefonte_______... ..____              390. 6       32.5 miles above Guntersville, Ala...........          110       600                 8                575      583    ....--
                                                                                                                                                                                 do....-........ (1)                    (1)      2, 200,   000. 00
Widows Bar lock and dam .                407. 6       56.5 miles below Chattanooga, Tenn__.....-             110       600               169.6            15583 15592. 6 ...---- do-.....------- (15)                   (15)   151, 595,   000.00
Hales Bar lock and dam ._.               431.2        32.9 miles below Chattanooga, Tenn-.........            60       265                36. 6             592. 6 16629. 2 -----.do-......----- 100                    1913     17236,    388. 87
                                                                                                                                                                                                                                                     M2



Sherman Hill_--          ...-            468. 7       4.6 miles above Market Street Bridge, Chat-
                                                         tanooga, Tenn.
                                                                                                             110       600                11.8              629. 2   641     ----....
                                                                                                                                                                                 do.....--.-..                           (1)     2, 300,   000. 00   z
Chickamauga 2 18_.....         __        471.0        6.9 miles above Market Street Bridge, Chat-            60        358. 8           1954              19628       19682            do............. (20)
                                                                                                                                                                                   .....                                       6 3, 243, 000.00
                                                         tanooga, Tenn.
United States Quarry..._-.               486. 4       22.3 miles above Market Street Bridge, Chat-           110       600                12               641          653        ....do............. (1)              (1)      2, 300, 000. 00         W

                                                         tanooga, Tenn.
Sale Creek ... ..   ... ......           495.0        30.9 miles above Market Street Bridge, Chat-           110       600                10               653          663        _--..do.....------.          (1)     (1)      2, 130, 000.00          W
                                                         tanooga, Tenn.
Kelly Shoals___.    .    .__             510. 8       46.7 miles above Market Street Bridge, Chat-           110       600                10               663          673                            (1)
                                                                                                                                                                                   ..--do..------..........             (1)      2, 130, 000. 00
Watts Bar ....  ____ .__ _               529. 9
                                                         tanooga, Tenn.
                                                      37.9 miles below Kingston, Tenn-........              110        600                10               673         683         .....do..........----                (1)      2, 130, 000. 00
                                                                                                                                                                                                                                                     zH
                                                                                                                                                                                                                (1)                                  r
White Creek Island-.....                 543.9        23.9 miles below Kingston, Tenn....-.......           110        600                10               683         693                            (1)
                                                                                                                                                                                       do...........------
                                                                                                                                                                                   -....                                (1)      2,130, 000.00
Half Moon Island_.........._             548. 6       19.2 miles below Kingston, Tenn- ..-........          110        600                10               693         703         .-. do--.... ---....         (1)     (1)      2, 070.000.00       r

Caney Creek Island_.         _ __        561.8        6.0 miles below Kingston, Tenn-.............          110        600                10               703         713         -.- do.....-------           (1)     (1)      2, 070, 000. 00     0i2
Seven Island Shoals.........             575. 1       7.3 miles above Kingston, Tenn.............           110        600                10               713         723         ---..do...........           (1)      (1)     2, 070,000.00           I
Sweetwater Island....._ _                584.3        7.2 miles below Loudon, Tenn...........               110        600                10               723         733                                       ('1)   (1)      2, 070, 000. 00
Rock Quarry Bar .....
                    _        ....        595. 0       3.5 miles above Loudon, Tenn_...........___           110        600                10               733         743                                              (1)      2, 070, 000. 00
Sister Island Shoals..........           604. 6       13.1 miles above Loudon, Tenn-......._....            110        600                10               743         753         -. do ...---.----             (1)
                                                                                                                                                                                                                (1)     (1)      2, 070, 000. 00
Coulter Shoals___ .. ____                                                                                                                                                                                               (1)
                                         608. 6       17.1 miles above Loudon, Tenn_ ............           110        600                10               753         763         --- do .....--
                                                                                                                                                                                              - - - ..
                                                                                                                                                                                     -- do .........             (1)    (1)      2, 070, 000.00
Rogers Island._____________              616. 6       31.1 miles below Knoxville, Tenn_..._______           110        600                10               763         773          ---   _do-------------
                                                                                                                                                                                                                 (1)
                                                                                                                                                                                                                        (1)      2, 040, 000.00
Georges Branch ______________            630. 6       17.1 miles below Knoxville, Tenn...........           110        600                10               773         783          _ - do---.......
                                                                                                                                                                                   --                           (1)
                                                                                                                                                                                   ----..do------------                 (1)      2, 040, 000.00
Little River Shoals ........             635.0        12.7 miles below Knoxville, Tenn.______.---_          110        600                10               783         793                                      (1)              1,960, 000.00       I.
Williams Island __.___
                  .......                638. 4       9.3 miles below Knoxville, Tenn-......_..             110        600                10                           803         --..do.-----------           (1)     (1)                          z
                                                                                                                                                           793                                                                   1,960, 000. 00
                                                                                                                                                      I           I            I                          I

     1 Proposed dam, no work performed; estimated cost.                                                                                                                                                                                              H

     2 Lock and dam under construction by Tennessee Valley Authority.
     8 Estimated cost of lock only.
    1R Existing dam to be reconstructed to provide a 9-foot navigable depth and size of lock increased. Estimated cost is shown for reconstruction.
    16Normal elevation of dam (626.1) is at present increased 3 feet by flash boards.
    17Actual cost to United States of existing lock; cost of existing lock and dam to power company was about $6,686,700.
    18Will eliminate United States Quarry, Sale Creek, and Kelly Shoals low-dam projects.
    19 Present conditions; final: Lift 48 feet, lower pool elevation 634 feet, and upper pool elevation 682 feet.
    2s Lock 95 percent completed; dam 15 percent completed.
1042    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The extreme fluctuation in the stage of the river varies from about
49 to 55 feet below Riverton; from 30 to 53.4 feet between Riverton
and Colbert Shoals; from 30 to 33 feet between Colbert Shoals and
Florence; from 11 to 33 feet between Florence and Browns Island;
from 11 to 49 feet between Browns Island and Hales Bar; from 16
to 53 feet between Hales Bar and Chattanooga; from 36 to 53 feet
above Chattanooga.
   The estimated cost, exclusive of amounts expended on previous
projects, is $74,709,000 for new work and $40,000 annually for the
maintenance and operation of each lock and dam.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 328, 71st Cong., 2d sess.), which author-
ized the appropriation of $5,000,000 for the prosecution of work on
this project. Operation and care of canals, locks, and dams were
included in the project July 1, 1935, under the provisions of the
Permanent A;ppropriations Repeal Act approved June 26, 1934. The
latest published maps are in the project document.
   Under the provisions of the Tennessee Valley Authority Act of
1933, as amended by an act approved August 31, 1935, the Tennessee
Valley Authority is given power to construct such dams in the Ten-
nessee River as will provide a 9-foot channel and maintain a water
supply for same, from Knoxville to its mouth. This agency has
under construction at the present time four high navigation power
dams as follows: Pickwick Landing (mile 206.7) 40 percent com-
pleted, General Joe Wheeler (mile 274.9) 98 percent completed,
Guntersville (mile 349.0) 18 percent completed, and Chickamauga
(mile 471.0) 15 percent completed.
   Recommended modifications of project.-Under date of December
7, 1931, a report was transmitted to Congress reporting on the pro-
spective cooperation offered by responsible interests under the Fed-
eral Water Power Act in the program of construction recommended
by the Chief of Engineers providing for the 9-foot project on the
Tennessee River by means of high dams. In this report it is also
recommended that the appropriation of funds be authorized for the
construction of low navigation dams to provide 9-foot navigation
from head of Colbert Shoals to the Hales Bar Lock and Dam below
Chattanooga, at an estimated cost of approximately $22,500,000,
which is $17,500,000 in excess of the present authorized appropriation
 (H Doec. No. 131, 72d Cong., 1st sess.).
   Local cooperation.-An act of Congress of April 26, 1904 (as
amended by an act dated Jan. 7, 1905), authorized the construction
by private interests of the Hales Bar Lock and Dam, the power com-
pany doing the work being granted the use of the water power pro-
duced by the dam for a period of 99 years. The terms of the act
require that this company purchase and deed to the United States,
free of cost and within 12 months after its passage, all lands neces-
sary to the successful construction and operation of the lock and dam,
including flowage rights and rights-of-way to and from public high-
ways; that the lock and dam be constructed and given to the United
States complete and free of cost, except that the United States shall
prepare the plans, supervise the construction, and provide the lock
gates and ironwork and machinery necessary to operate the lock
when completed, at its own expense, and that the plans for the work
be approved by the Secretary of War. The act further requires that
       RIVERS AND HARBORS-NASHVILLE,           TENN., DISTRICT     1043
the contracting company shall furnish the necessary electric current
while its power plant is in operation to move the gates and operate
the lock and to light the United States buildings and grounds free of
cost to the United States, and that nothing shall be done in the use
of the water from the dam or otherwise that shall interfere in any
way with navigation.
   All the conditions imposed by the act have been complied with by
the power company except the transfer of flowage rights incident to
the construction of the dam. The Department has held that such
rights of flowage may be acquired and conveyed in the form of an
easement or servitude on the land affected by the work, and it is
understood that suits are pending between the power company and
landowners covering flowage rights.
   The construction work of the power company has been completed
and the lock put in operation, but several leaks under the dam have
developed, and final acceptance of the lock and dam by the United
States is being delayed until the result of the company's efforts to
stop them has been determined. The cost to the power company was
approximately $6,686,700, not including the power-house superstruc-
ture, the hydraulic installation, the electric installation, or the trans-
mission lines.
   The River and Harbor Act of July 3, 1930, requires no local coop-
eration in the construction of the alternate system of low dams. It
does, however, provide that in case high dams are built before the
United States shall have built the projected locks and low dams
which are to be replaced, the United States shall contribute to the
cost of the substituted structures an amount equal to the estimated
cost of the works of navigation for which substitution is made.
   Terminal facilities.--A full and complete report of terminals along
the Tennessee River in 1918 is contained in House Document No. 652,
Sixty-sixth Congress, second session. Additional data are also con-
tained in Transportation Series No. 2, 1929, Transportation in the
Mississippi and Ohio Valleys. Modern river terminals, municipally
owned, have been constructed at Chattanooga, Tenn., but the other
public terminals are mostly unimproved landings.
   The existing commerce is'generally being handled at great disad-
vantage due to lack of more suitable wharves, transfer facilities, and
warehouses, and this condition undoubtedly discourages the trans-
portation of freight by river.
   Operations and results during fiscal year-Above Chattanooga
 (188 miles).-The work of repairing and clearing brush from around
channel markers, which was commenced in June 1936, was brought
to completion. The total cost in this section during the fiscal year
was $7,133.85, all of which was for maintenance.
   Chattanooga to Riverton (237.6 miles).-The permanent upper
miter sill at General Joe Wheeler Lock was constructed, in which
3,950 cubic yards of concrete were placed. A retaining wall on river
bank at this lock was built, in which 350 cubic yards of concrete
were placed. Dredging operations were carried on in the vicinity of
Chattanooga, Tenn., at Larkins Towhead, North Sauty Creek, Gross
Bar, and Sweetwater Bar. A total of 26,974 cubic yards of gravel,
rock, and mud was removed at these locations. Snags and surface
obstructions were removed in General Joe Wheeler Pool, experi-
mental snagging was carried on in Widows Bar Pool, channel mark-
1044          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

ers were repaired and maintained, and shoals surveys made. One
flowage easement in Widows Bar Pool was purchased at a cost of
$1,000. The total cost of operations for the year in this section
amounted to $121,018.79, of which $70,507.40 was for new work, and
$50,511.39 for maintenance.
   Below Riverton (226.5 miles).-Dredging operations were carried
on at Beech Creek Island, Petticoat Riffle, Beech River Shoals, Den-
sons Landing, Duck River Sucks, Johnsonville Bridge, Rockport
Bar, mouth of Duck River, Leatherwood Shoals, Hurricane Island,
Panther Creek Island, and Blood River Island. A total of 121,410
cubic yards of sand and gravel was removed. Shoal surveys were
made, channel markers were repaired and maintained in cooperation
with the United States Lighthouse Service, and one gaging station
was maintained in cooperation with the United States Geological
Survey. The total cost in this section was $97,140.03, all of which
was for maintenance.
   Maintenance (operation and care).-The locks were operated and
dwellings, grounds, locks, and equipment were cared for. All work
was done with Government plant and hired labor. The costs for the
year were $104,172.66.
   The total costs for all work on the entire river during the fiscal
year were as follows:

                                                                         New work            Maintenance       Total

Maintenance and improvement-------...........------____$70,              -       507. 40      $154, 785. 26   $225, 292. 66
Operating and care_ --       __
                       .-.-------.-- --.--.--. _            ---
                                                            _---             ___-----_         104, 172. 66    104, 172. 66
      Total- ----------...   - ------------------.   __            -__         70, 507. 40     258, 957. 92    329, 465. 32"



   The total expenditures for the fiscal year were $357,087.61.
   Condition at end of fiscal year (previous projects)--Above Chatta-
nooga.-Under previous project the open-channel work for securing
a channel 150 feet wide and 3 feet deep at extreme low water was
about 58 percent completed. The minimum available depth in the
section above Chattanooga is about 1 foot at extreme low water. The
river is usually navigable for 2-foot draft from December 15 to
August 1, and for 3-foot draft from January 1 to June 1. Draft of
4 feet and over is occasionally practicable for short, disconnected
periods, during high-water months, from January to April, inclu-
sive. When the United States Geological Survey gage at Loudon
reads 3.4 feet, 2-foot navigation is practicable, and for each addi-
tional foot of reading on this gage 1 additional foot of navigable
water depth is available.
   Chattanooga to Riverton.-Under previous projects, Hales Bar
lock and dam was completed and placed in operation November 1,
1913, providing 6-foot low-water navigation up to Chattanooga,
Tenn. (32.9 miles). Widows Bar lock and dam has been in opera-
tion since 1925. The minimum available depth between Hales Bar
and Widows Bar Dam is 4.5 feet.
   The limiting depth between Widows Bar lock and dam and the
head of Wilson Dam pool (132.5 miles) is about 3 feet at 1931 low
water. The construction of dam no. 2 (Wilson Dam), 2.9 miles
above the railroad bridge at Florence, Ala., submerged locks nos. 3
       RIVERS AND HARBORS-NASHVILLE,         TENN., DISTRICT    1045
to 9, inclusive, of the Muscle Shoals Canal and provided a depth of 9
feet for a distance of 14.7 miles. Between Wilson Dam and Colbert
Shoals Canal 4 feet minimum depth is available; over miter sills at
Riverton Lock, 7.3 feet is available; and in the open river over
Colbert and Bee Tree Shoals, 1 foot is available.
    Dam no. 2 to Florence Bridge, Ala. (dam no. 1).-The project is
considered completed at a saving of $610,784.75 under the estimated
cost. The present limiting depth between dam no. 1 and dam no. 2
is 7 feet, which is ample for existing and reasonably prospective
commerce. This depth may be increased to 9.5 feet when needs of
navigation require it.
   Below Riverton.-Additional dredging to maintain a navigable
depth of 5 feet during the next fiscal year is necessary at McCullochs
Bar, Hurricane Islands, mouth of Duck River, Double Island, Dia-
mond Island Shoals, and Big Bend Shoals. A navigable depth of
5 feet, available when the Johnsonville gage reads zero and the lower
gage at Riverton lock reads 7 feet, is ordinarily available through-
out the year, except at Indian Creek and Big Bend Shoals, where
on account of rock bottom the navigable depth is restricted to 41/2
feet. From December 15 to August 15, 6-foot navigable depth or
greater is available.
   Condition at end of fiscal year. Existing project.-Preliminary
investigations were carried on until August 1, 1933, on which date
the Chattanooga district office was abolished and no further work
was done by that district; the work in question having been trans-
ferred to the Tennessee Valley Authority.
   The completed canals, locks, and dams have been operated and
maintained under the permanent indefinite appropriation to the end
of the fiscal year 1935, as follows:
   Hales Bar lock and dam, since November 1, 1913; Widows Bar
lock and dam, since October 1, 1925; Muscle Shoals Canal, since-
1890; lock no. 3 (General Joe Wheeler Dam), since November 27,
1934; lock no. 2 (Wilson Dam), since June 1927; lock and dam no. 1,
since March 1, 1926; and Colbert Shoals Canal, since November 1911.
   Subsequent to June 30, 1935, operation and maintenance have been
carried on with funds appropriated for the preservation and main-
tenance of rivers and harbors.
   The total cost of the work since the project was modified in 1930,
has been $3,981,107.28, of which $2,031,542.71 was for new work, $1,-
754,901.27 for maintenance, and $194,663.30 for operating and care.
The total expenditures were $3,398,952.71.
   In addition the sum of $2,889,148.75 was expended between 1890"
and June 30, 1935, on the operation and care of the works of im-
provement under the provision of the permanent indefinite appro-
priation for such purposes.
1046      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-Thebalance unexpended, including accounts
receivable at the end of the year, together with an allotment of
$200,000, made during July 1937, will be applied as follows:
Accounts payable June 30, 1937---    _________-______________ $7, 203. 77
Maintenance:
    Snagging in Widows Bar Pool: Operation of dredge Virginia
        and attendant plant, Aug. 16-Dec. 16, 4 months, at $12,500
         per month       -----------------                                         50,000.00
    Snagging (removal of isolated snags and other surface obstruc-
      tions), July 1, 1937-June 30, 1938:
         Widows Bar Dam to Riverton lock __________________            2, 000.00
         Below Riverto-----------------------------------------3,         000. 00
   Dredging, Sept. 15-Nov. 30, 1937----------------------------        5, 000. 00
    Shoals surveys, July 1, 1937-June 30, 1938__________ ______---13, 000. 00
   Maintenance of channel markers, July 1, 1937-June 30, 1938 __       8, 966. 98
    Stream gaging in cooperation with U. S. Geological Survey,
      July 1, 1937-June 30, 1938____---------------------------------     400. 00
Operation and care of locks and dams (July 1, 1937-June 30, 1938) :
    Operation of locks and dams and other works--------------- 100, 060.00
   Ordinary maintenance and repairs---------------------------        25, 800. 00
       Total-   _      ______ ____     -__ -___           215, 430. 75
  The additional sum of $460,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance:
   Above Riverton:
        Snagging, removal of accumulated gravel bars, repair of dikes,
          and sweeping of dredged channels ____________---
                                                   -______             $85, 000
        Maintenance of channel markers---- --------                      4, 000
        Shoal surveys---------------------------------------------       5, 000
        Houses and utilities, Guntersville and Chickamauga lock
           reservaions                   -------       ------                         100, 000
   Below Riverton:
        Dredging_____                                                 127,                 250
        Shoal surveys ----------------------------------------------    5,                 000
        Stream gaging--       ------------------------------------                         400
Operating and care of locks and dams:
   Operation of locks and dams-----------------------------------     111,                 000
   Ordinary maintenance and repairs -------------      __   __-__--8,                      500
   Channel work--------------------------- --------------------- 13,                       850

       Total for maintenance____________           ____-----                          460, 000

                             Cost and financial summary

Cost of new work to June 30, 1937_---   ___ __----   ____    $16, 038, 735. 37
Cost of maintenance to June 30, 1937------------------------   5,954, 739. 39
      Total cost of permanent work to June 30, 1937     __      -------        21, 993, 474.76
Undistributed costs June 30, 1937_
                                ----------------------------                         1, 843. 84

      Net total cost to June 30, 1937---- -------------                        21,995, 318.60
Plus accounts receivable June 30, 1937                                              8, 960. 98

      Gross total costs to June 30, 1937                                       22, 004, 279. 58
Minus accounts payable June 30, 1937------------------------                         7, 203. 77

     Net total expenditures__-------------------                               21, 997, 075. 81
Unexpended balance June 30, 1937---------------------------                          6, 469.77

       Total amount appropriated to June 30, 1937                    -    -   122,003,   545.58
  1 Includes $2,889,148.75 permanent indefinite appropriation for O. & C. and $142,625.13
adjustment of previous year's cost.
           RIVERS AND HARBORS-NASHVILLE, TENN., DISTRICT                                                                1047

   Fiscal year ending June 30                   1933              1934            1935           1936                 1937


Cost of new work____.. ... ...     ...      $434, 910. 31 $1, 025, 168.37      $335, 204. 66    $2, 724. 71          $70, 507. 40
Cost of maintenance....             __       284, 790. 86     251, 641. 81      199, 005. 10   304, 581. 70          258, 957. 92

      Total cost----------------719, 701. 17                 1, 276, 810. 18    534, 209. 76   307, 306. 41          329, 465. 32

Total expended     ....----------------      635, 316. 14    1, 391, 008. 34    156, 978. 52   317, 648. 60          357, 087. 61

Allotted--.__.----.        __.------       1, 749, 085. 64     473, 131. 18     209, 037. 14   291, 987. 72          107 500. 00


Balance unexpended July 1, 1936---------------------------                                                    $256, 057. 38
Amount allotted from War Department Appropria-
tion Act approved April 9, 1935________--____ $5, 000.00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 193.6-_                                      --          102, 500. 00
                                                                                                               107, 500. 00

      Amount to be accounted for________________________          363, 557. 38
Gross amount expended                              420, 971.13
                                                  $_______________________
Less-
    Reimbursements collected---------$63, 787. 27
    Receipts from sales______----- - -__   96. 25
                                                    63, 883. 52
                                                                                                               .   75,707    61

      Balance unexpended June 30, 1937-------------------                                                          6,469. 77
Outstanding liabilities, June 30, 1937--------------------------                                                   8,678. 43

     Balance available June 30, 1937 ------------------------                                                  -2, 208. 66
Accounts receivable June 30, 1937---------------------------                                                     8,960. 98

     Unobligated balance available June 30, 1937 ------------                                                      6, 752. 32
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937-----_------------------ ---------                                                 200, 000. 00

        Balance available for fiscal year 1938----------                                  ---------            206 752. 32

Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1 _______                                                                      460, 000. 00,
  1 Exclusive of available funds.

    3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                    (GENERAL)

  The total cost during the year was $229,881.56. The total expendi-
tures were $224,321.75.
  The balance unexpended June 30, 1937, together with accounts re-
ceivable, $8,886.86, and allotment of $67,700 made during July 1937,
will be applied as needed during the fiscal year 1938 to payment of
expenses to be incurred under this heading.
  The additional sum of $145,000 can be profitably expended during
the fiscal year ending June 30, 1939.
                                          Cost and financial summary
Cost of new work to June 30, 1937------------------------------------ -
Cost of maintenance to June 30, 1937------------------------ $1, 203,312. 93

      Total cost of permanent work to June 30, 1937------------1, 203, 312. 93
Undistributed costs June 30, 1937--_----------------------------    -455. 91

        Net total cost to June 30, 1937                                                              _1,202, 857. 02
1048            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Plus accounts receivable June 30, 1937--           --
                                                  ________________        $5,388. 09
      Gross total costs to June 30, 1937                               ,208,245. 11
                                                                      1---------------------
Minus accounts payable June 30, 1937           __- _____
                                            -------               -_______11, 241. 40
      Net total expenditures----------------------------- 1,197, 003. 71
Unexpended balance June 30, 1937--_--------______________         _         3, 498. 77
      Total amount appropriated to June 30, 1937--------------1, 200,502. 48

    Fiscal year ending June 30                   1933                  1934            1935               1936             1937


Cost ofnew work---------.-.
Cost of maintenance               _----------- $183,423.81      $140, 560. 92       $179, 449. 12    $236, 419. 43       $229, 881. 56
Total expended- ---------------- 163, 484. 18                        164, 672. 15    177, 269. 74     237, 602. 24        224, 321. 75

Allotted......---------------------308, 156. 61                       54, 085. 87    183, 860. 00     323, 000. 00         95, 000.00


Balance unexpended July 1, 1936_-    __----      __-----                                       __------              $132, 820. 52
Amount allotted from War Department Appropria-
  tion Act approved Sept. 14, 1932----------------                                            $23, 011 87
Amount allotted from War Department Appropria-
  tion Act approved Apr. 9, 1935_----------------                                              19, 184.91
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936- ---------------                                              48, 803. 22
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933----------------                                                4, 000. 00
                                                                                95, 000. 00
      Amount to be accounted for          ------------------------ 227, 820.52
Gross amount expended     --         -___--
                                   _____----     -          $255, 866.08
Less:
    Reimbursements collected---------$30, 653.32
    Receipts from sales_ __-    _____---        891. 01
                                                              31, 544. 33
                                                                               224, 321. 75
      Balance unexpended June 30, 1937---       ------------           -    -    3,498. 77
Outstanding liabilities June 30, 1937---------------                 ___        13, 011. 10
      Balance available June 30, 1937__ ----------______                ---      9, 512. 33
Accounts receivable June 30, 1937---      ------------------         __          5, 388. 09
      Unobligated balance available June 30, 1937-----------                 -- 4, 124. 24
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937------------------------------------                    67, 700. 00
      Balance available for fiscal year 1938 _--------__          -----         63, 575. 76
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1___________                                                                          145, 000. 00
  1Exclusive of available funds.

   4. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                 [Commercial statistics for these projects are given in pt. 2 of report]

                                                                      For last      Cost and expenditures to
                                                                      full re-            June 30, 1937                 Estimated
                     Name of project                                  port, see                                         amount re-
                                                                       annual                                           quired to
                                                                       report       New work        Maintenance         complete
                                                                        for-

1. French Broad and Little2 -Pigeon       - - - - - - Tenn.'.
                              - - - - - -Rivers,      -- - -- -- -       1931       $249, 604 80      $33, 554. 02           $533, 000
2. Hiwassee River, Tenn.                                                 1923        113, 311. 26       9,754. 45              83, 000
3. Clinch River, Tenn. and Va.l-----------------                         1923         53, 949. 19       7, 873. 24            677, 000

  2Channels      adequate for existing commerce. Abandonment recommended in H. Does. Nos. 428 and
489, 64th Cong., 1st sess.
  2Recommended for abandonment in H. Doc. No. 467, 69th Cong., 1st sess.
            RIVERS AND HARBORS-NASHVILLE, TENN., DISTRICT                                                   1049
          5. PLANT ALLOTMENT FOR NASHVILLE, TENN., DISTRICT
                                     Cost and financial summary
Undistributed costs June 30, 1937--______                                               ----         $553, 561.99
Plus accounts receivable June 30, 1937_--------------                                           __     24, 467. 02
      Gross total costs to June 30, 1937----------------------578,    029. 01
Minus accounts payable June 30, 1937 --------------                5, 441. 13
      Net total expenditures_ .-. ____-...                      ______             ____---   572, 587. 88
Unexpended balance June 30, 1937__.111                        111111--- 1              1_--      658.67
         Total amount appropriated to June 30, 1937             ---------------                       573, 246. 55

   Fiscal year ending June 30              1933       1934          1935                 1936              1937


Total expended.....          ...-------------------             $441,335.55       $114, 066.04            $17,186. 29

Allotted...........-------          --------                     453, 312.86           119, 226.75            706.94


Balance unexpended July 1, 1936-----------         ------                                            $17, 138. 02
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-------- ---     __________--__-     ___                                          35, 706. 94
     Amount to be accounted for________________________                                                52, 844. 96
Deductions on account of revocation of allotment --------------                                        35, 000. 00
       Net amount to be accounted for------------------------17,                                           844. 96
Gross amount expended----_----       _____--______ $610, 896. 78
Less :
    Reimbursements collected----------$580, 285. 63
    Receipts from sales-________   -  _   13, 424. 86
                                                      593, 710. 49
                                                                                                       17, 186. 29

      Balance unexpended June 30, 1937________________________                                             658. 67
Outstanding liabilities June 30, 1937---------------------                                              8, 735. 99
      Balance available June 30, 1937-  ___________-----_____                                        -8, 077. 32
Accounts receivable June 30, 1937----------___------------__                                          24, 467. 02

         Unobligated balance available June 30, 1937______________                                     16, 389. 70
            6. CUMBERLAND RIVER BASIN, KY., FLOOD CONTROL
  Location.-The proposed works are located at Middlesboro, Ky., on
Yellow Creek, a tributary entering the Cumberland River about 660
miles above its mouth, and on the left bank of the Cumberland
RIiver at Pineville, Ky.
  Existing project.-The Flood Control Act approved June 22, 1936,
provides for the construction of flood-control works, in accordance
with the report published in House Document No. 38, Seventy-third
Congress, first session.

                                                                            Estimated                Estimated cost
                                  Project                                  construction               of land and
                                                                                cost                    damages

Pineville, on Cumberland River, Ky., levees to protect people and city
property --------------------                                                     $507, 440              1$280,625
Middlesboro, on Cumberland River, Ky., levees to protect people and
city property--__341----------------------------               -              -436,       540             2159, 460
  1 Includes $190,000 for cost of land and rights-of-way.
  2 Includes $60,000 for cost of land and rights-of-way.
1050           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-See page 6.
   Condition at end of fiscal year-Pineville,Ky.-Preliminary studies
in connection with construction of levees for flood-control purposes
were abandoned, as local interests were unable to meet the require-
ments of local cooperation required under the Flood Control Act.
   Middlesboro, Ky.-Project plans in connection with a diversion
project for the city of Middlesboro, Ky., were completed during the
fiscal year 1937. The costs and expenditures to June 30, 1937, for
both localities were defrayed from Emergency Relief funds for assist-
ance for educational, professional, and clerical persons.
   Proposed operations.-The balance unexpended at the end of the
year, together with an allotment of $275,000 ($223,000 regular funds
and $52,000 relief funds) made during the fiscal year ending June 30,
1938, will be applied to new work, construction by contract of drain-
age structures, clearing of rights-of-way, and excavating and placing
about 125,000 cubic yards of earth involved in levee construction at:
Middlesboro, Ky.
   The additional sum of $261,000, including $99,460 to be contributed
by local interests, can be profitably expended during the fiscal year
1939 to bring the Middlesboro flood-control project to completion.
                                        Cost and financial summary
Total amount appropriated to June 30, 1937________________                                         --------
Amount allotted during August 1937 _________                    _ $275,000,
                                                       _____________
Amount available for fiscal year 1938________________________                                        275, 000

Amount         (estimated) required to be appropriated for completion of
   existing       project 1______________________                                                    261, 000
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work --------------------------------------------                                     261, 000
   1 Exclusive of available funds.

            7. SHELBY PARK, NASHVILLE, TENN. (RELIEF PROJECT)

  The work of riprapping river bank at Shelby Park, Nashville, Tenn.
(mile 193), was completed during the fiscal year 1937. The job as a
whole consisted of 15,634 cubic yards of stone quarried, 35,727 square
yards of bank cleared and shaped, 52,292 square yards of riprap
placed, and 6,178 linear feet of windrow of stone placed.
  The total cost and expenditures to June 30, 1937, were $56,733.21,
Emergency Relief funds.
                                        Cost and financial summary

Cost of new work to June 30, 1937__                            ____      ________          _ $56, 733. 21
Cost of maintenance to June 30, 1937____-____________----__                                   ----------
      Total cost of permanent work to June 30, 1937______________                                  56, 733. 21
Net total expenditures______       ___________   --                                                56, 733. 21
Total amount appropriated to June 30, 1937__________________                                       56, 733. 21

         Fiscal year ending June 30               1933            1934    1935         1936            1937


Cost of new work       ______                         ______                        $51, 560. 86      $5, 172. 35
Cost of maintenance-.............----
Total expended-.-- -----                 -   --------                                52, 729. 19       4,004.02
              ----
Allotted- -_-__--                             -----                                  59, 844. 35     -3, 111. 14
          RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS                                                 1051
Balance unexpended July 1, 1936     ----------------------------$7,115. 16
Deductions on account of revocation of allotment----------------3, 111.14

       Net amount to be accounted for---   ----------------------                                   4, 004.02
Gross amount expended--------------------------$6, 631. 72
Less--
    Reimbursements collected---------------     $696. 57
    Receipts from sales------------------- 1, 931. 13
                                                         2, 627. 70
                                                                                                    4, 004.02

Status of reports called for by river and harbor acts and committee resolutions

                                                                  Date trans-                     Recommenda.
        Locality                   Authorization act               mitted to       Document no.       tion
                                                                   Congress


Cataco Creek and its          Flood Control Act,
branches,    Morgan               Apr. 15, 1932.
County, Ala. (prelim-
inary examination for
flood control).
Cumberland River,             River and Harbor Act, -__                   ______
above Nashville,              Aug. 30, 1935.
Tenn.
Cumberland River,             Rivers and Harbors
Ky., and Tenn.                Committee resolu-
                                tion, Feb. 14, 1936.
Flint   Creek   and   its     Flood Control Act,
branches,      Morgan             Apr. 15, 1932.
  County, Ala. (prelim-
inary examination for
flood control).
Flint River, Ala. and
Tenn. (preliminary ex-
                            ----     do _-----------..--                                   ----
amination for flood
control).
Paint Rock River, Jack-       Flood Control                Act,
son County, Ala. (pre-        June 13, 1934.
liminary examination
for flood control).



                                                   OHIO RIVER
   For the actual construction of the new locks and dams and the
operation and care of the completed structures the river is divided
into four sections under the immediate supervision and direction of
district engineers at Pittsburgh, Huntington, Cincinnati, and Louis-
ville.
   The Pittsburgh section extends from the head of the river at Pitts-
burgh, Pa., to about mile 109 between Captina Island and Powhatan
Point, a distance of 109 miles, and includes Emsworth, Dashields,
and Montgomery Island locks and dams and dams nos. 7 to 13, in-
clusive; the Huntington section extends from about mile 109 between
Captina Island and Powhatan Point to about mile 317.5, just below
the mouth of the Big Sandy River, Ky., a distance of about 208.5
miles, and includes dams nos. 14 to 28, inclusive, and Gallipolis locks
and dam; the Cincinnati section extends from about mile 317.5
just below the mouth of the Big Sandy River, Ky., to about mile
.556.2, just above Madison, Ind., a distance of about 238.7 miles, and
includes dams nos. 29 to 39, inclusive; the Louisville section extends
from a point (50 miles above Louisville) 1.5 miles above Madison,
Ind., to the mouth of the river, a distance of 424.8 miles, and includes
dams nos. 41 (with the Louisville and Portland Canal) to 54.
   District engineers: At Pittsburgh, Pa., Lt. Col. Wm.E. R. Covell,
Corps of Engineers; Huntington, W. Va., Lt. Col. John F. Conklin,
1052     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Corps of Engineers to June 14, 1937, and Lt. Col. J. D. Arthur, Jr.,
Corps of Engineers, since that date; Cincinnati, Ohio, Lt. Col.
Charles L. Hall, Corps of Engineers, to September 10, 1936, Maj.
F. W. Gano, Corps of Engineers, acting district engineer to October
10, 1936, and Lt. Col. D. O. Elliott, Corps of Engineers, since that
date; Louisville, Ky., Lt. Col. Gilbert Van B. Wilkes, Corps of
Engineers, to December 21, 1936, and Lt. Col. D. O. Elliott, Corps
of Engineers, since that date.
   Division engineer: Col. R. G. Powell, Corps of Engineers.
                               IMPROVEMENTS
                                                                         Page
1. Construction of locks and dams, Ohio River_----------_ _        ---   1052
2. Open-channel work, Ohio River______________________________           1062
3. Ohio River Basin, flood control -----------------------------------   1066
   1. CONSTRUCTION OF LOCKS AND DAMS ON THE OHIO RIVER

   Location.-The Ohio River is formed by the junction of the Alle-
gheny and Monongahela Rivers and empties into the Mississippi,
River at Cairo, Ill. The total length of the river is 981 miles. For
description of the river see page 1227, Annual Report for 1932.
   Previous projects.-The first lock and dam on the Ohio River was
provided for by River and Harbor Act of March 3, 1879. The con-
struction of dams was provided for by river and harbor acts, as
follows: Dam no. 6, September 19, 1890; dams nos. 2, 3, 4, and 5, June
3, 1896; nos. 13 and 18, March 3, 1899; nos. 8, 11, 19, and 37, June 13,
1902; no. 26, March 2, 1907. The cost and expenditures on original
and subsequent projects prior to commencement of operations under
the existing project, adopted in 1910, including amount expended
for purchase, etc., of Louisville and Portland Canal, were $17,657,-
273.78. For further details see page 1907 of Annual Report for 1915.
   Existing project.-This provides for the improvement of the entire
river by the construction of locks and dams to provide a channel
depth of 9 feet and for the widening of the Louisville and Portland
Canal at Louisville, Ky. The project provides for one lock with
usable dimensions of 110 by 600 feet at each dam, and in addition
thereto second locks at the Emsworth, Dashields, Montgomery Island
dams, and dam no. 41, with usable dimensions of 56 by 360 feet.
Except at Emsworth, Dashields, and Montgomery Island, all the
dams are of the movable type, with navigable passes varying in
width from 600 to 1,248 feet. In addition to the navigable pass,
each dam, except the fixed dams, is provided with one or more regu-
lating weirs. At dam no. 41 a canal (Louisville and Portland)
extends along the left bank 2 miles long, with locks at the lower end.
   Operation and care of the locks and dams were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
   The estimate of cost of new work revised in 1934, including ex-
penditures on previous projects prior to adoption of the 9-foot proj-
ect in 1910, but exclusive of the Gallipolis locks and dam reported
under the Kanawha River project, is $129,000,000, including $3,000,-
000 for raising Emsworth Dam, authorized by the Emergency Relief
Appropriation Act of April 8, 1935.
      RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS              1053
   The estimate of annual cost of operation and care of locks and
dams, made in 1936, is $2,694,000.
   The project was adopted by the River and Harbor Act of June
25, 1910 (H. Doc. No. 492, 60th Cong., 1st sess.), which provided for
the construction of 54 locks with movable dams and for the widen-
ing of the Louisville & Portland Canal to 170 feet and the con-
struction of a new lock at the lower end. The act also granted
discretionary authority to the Secretary of War to make such modi-
fications in the project as appeared advisable. The River and Har-
bor Act approved July 18, 1918, provided for the elimination of locks
and dams in the lower river where the project depth of 9 feet could
be satisfactorily maintained by open channel work and authorized
the Secretary of War to substitute fixed dams for movable dams
wherever, in his opinion, they may be desirable (H. Doc. No. 1695,
64th Cong., 2d sess.).
   Under the authority granted in the River and Harbor Act of
1910 the Louisville and Portland Canal has been widened to 200
feet; dams nos. 40 and 42 have been eliminated; locks and dams nos.
1 and 2 replaced by the Emsworth lock and dam;i lock and dam
no. 3 replaced by the Dashields lock and dam; and the Montgomery
locks and dam replaced locks and dams nos. 4, 5, and 6.
   The following table contains information concerning various fea-
tures of the locks and dams included in the existing project:
                                                                                                                         Depth on miter
                                                                                                                            Lock
                                       Location
                                                                                                   Dimensions            Depth on miter
                                                                                                                             sills
                                                                                                                                                                                                   Per-      Year  Estimated or
                                                                                                                                                                          Character of dam        cent-     opened actual cost
No.                                                                                                                                                                                                                                         I
                                                                                                      Great-                                                                foundation             age        to   of each lock             C~




                                                                                                       est                                     Character of                                       corn-      navi-
      Miles                                                                                Width                                               foundation                                                           and dam 1
                                                                                                     length                                                                                      pleted     gation
      below         Distance from nearest town or mouth of                                   of       avail-    Lift
                                                                                                                                                                                                                                            C
      Pitts-                  navigable tributary                                          cham-                         Upper     Lower
      burgh                                                                                           able
                                                                                            ber      for full                                                                                                                                   J




                                                                                                      width
                                                                                                                                                                                                                                                ©
                                                                                            Feet      Feet      Feet      Feet      Feet                                                                                                    0
               Replaced--                                                                                                                                                                                              $870, 034. 01
         6. 2  Emsworth, Pa_                                  S                              110        600                13. 0                                         Rock   (114 feet);
                                             -                                                                   11.0               12.9    Rock .....--       ......                               100      1921     6, 082, 743. 08
                                                                                              56        360                                                               gravel (1,613 feet):                                              ©
  2            Replaced                                    _"                                                                                                                                                            976, 766. 77       0
  3           .. .do_--                                                                                                                                                                                               1,144, 588. 18
        13. 3 Dashields lock and dam, 1.6 miles below J       1
                                                                                             110
                                                                                              56
                                                                                                        600     }10.0      14. 4    17. 7   Rock__                       Rock..-----..
                 Sewickley, Pa.                                                                         360                                                                                         100      1929     3, 528, 755. 67
  4            R eplaced---. .. .. .. .. .. .. .. .. .. ....                                                                                                                                                          1, 071, 472. 21
  5             . . . . .do - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - -                                                                                                                              1, 080, 132. 04           0
  6              ----do ----             -.
                                         .. .... .... ....
                            -------- . --.                                                                                                                                                                            1, 123, 441, 80
                fMontgomery Island lock and dam, 1.4 miles
        31.6
                    above Industry, Pa.
                                                                                             110
                                                                                              56
                                                                                                        600
                                                                                                        360      19.4      16.7     12. 7 Rock ...         -        --
                                                                                                                                                                         R ock ---------. .          98      1936   2 6, 000, 000. 00           z-)r
  7     36.5     Midland, Pa- -.-                                                            110        600       6.9      15.4     11. 0 -...do .....   ......... .....do - - .. .. --.            100      1914     1, 075,   000.   00
  8     46. 4    1.7 miles below Newell, W. Va _ --......                                    110        600       6.4      15.4      12. 0  Piles in gravel ......  Rock; piles in gravel           100      1911     1, 167,   456.   24
  9     56. 1
        66. 2
                 New Cumberland, W. Va- - --.........                                        110        600       7.4      15.4      11.0   -- d o ....
                                                                                                                                                    -    .... .... Piles in gravel -----            100      1914     1, 177,   100.   00       M
10              1.8 miles below Steubenville, Ohio ---------                                110        600       8. 4     16. 4     11.0 Rock and piles in ---...do.........                       100      1915     1,138,    000.   00
                                                                                                                                              gravel.
11     76. 9    2.5 miles below Wellsburg, W. Va -........                                   110        600      7. 3     15.4      11. 1 Piles in sand and         Piles in sand and              100      1911     1,162, 164. 70
                                                                                                                                                                                                                                                1
                                                                                                                                              gravel.                   gravel.
12     87. 4    Warwood, W. Va_                                                              110        600      8.4      15. 4     11.0 ---- do          ----        - do .......
                                                                                                                                                                       _-       -      .....        100      1917     1,166.103.55
13     96. 1    McMechen, W. Va_                                                             110        600      7. 3     13.8       9. 5 ... .do     -                                            100      1911                           F-1
                                                                                                                                                                    - _ do .......- - ---                             1,222,389.11
14    114. 0    Woodland, W. Va __                                                           110        600      8. 3     16. 4     11.0   Rock -.                 --     d o ... ... ... .        100      1917     1,133, 371.  47
15    129. 1    New Martinsville, W. Va -.....                                               110        600      7.8      15.4      11. 0 -- do _                        _do ...... ........       100      1916     1, 180, 477. 63
16    146. 5    Bens Run, W Va ....--                                                        110        600      7.8      15. 4     11. 2 .. ..do _                       d o ..............       100      1917     1, 275, 209. 93
17    167. 5    4.5 miles above Marietta, Ohio_                                              110        600      8.2      15.4      11.0 .. .. do _                       d o ...............      100      1918     1, 362, 591. 21
18    179.9     4. 5 miles above Parkersburg, W. Va -----.                                   110        600      6.2      14. 2     11. 0 --.. do--_                     _d o ..............       100      1910        927, 091.26
19    192. 2    Little Hocking, Ohio_--                                                      110        600      7. 7     16. 9     11.0   Piles in sand, gravel, .. ..d o .. ....    -....        100      1916     1, 213, 847. 92           58
                                                                                                                                              and rock.
20    232. 5    Belleville, W. Va_ --                  __                                    110        600     7. 5      15.4      11.0 Rock __                         _do_                      100      1917        936, 696. 01
21    214. 6    1.4 miles above Portland, Ohio_                                              110        600     5.6       15. 4     11. 0 -----do -                      _do                       100      1919     1, 484, 561.96
22    220.9     Ravenswood, W. Va ...-......                 .                               110        600     7.8       15. 4     11. 2 -----do                         do                       100      1918     1, 218, 797. 86
23    231.4     Millwood, W. Va ........._       ..            .                             110        600    38. 1      15. 4   4 11.0    _--do                      __do_                       100      1921     1, 875, 941. 59
24    242.5     0.9 mile below Racine, Ohio-....                                             110        600     7.0       15. 4     11. 0 -.. do _                       _do_                      100      1919     1, 187, 241. 87
25    260. 7    4.5 miles above Point Pleasant, W. Va ....                                   110        600     9.0       15. 4     11.0 ...-do _                        _d o ...- . -......       100      1922     1, 925, 204. 60
26    278. 5    Hogsett, V. Va - .. .. ..--.. .. .. ..     .. ..                             110                7.5       16. 9
                {Gallipolis  locks and dam, 0.4 mile below                                    110
                                                                                                         600
                                                                                                         600
                                                                                                                                     11.0 -     do ------------.. . .do --........                  100      1912     1, 307, 241.24
                                                                                                         360 }26. 0
       279. 2                                                                                                              18. 0     12. 0 --- do._                       _do_                        __
                                                                                                                                                                                                    --- -    1936
                   Hogsett, W. Va.                                                            110                                                                                                                          (5)
27    301.0     3.6 miles above Proctorville, Ohio- .-----                                   110        600% * 6.4        15. 4     11.1 -- dodo-_                  - _-do - -                     100      1923     2, 015, 601. 50
     28     311.6    3.3 miles below Huntington, W. Va.........               110       600       7. 1     15. 4     11.0                           ..-- do......---------
                                                                                                                            ....do.......----------....                                100   1915      1, 063,   132. 77
     29     319.9    2.7 miles above Ashland, Ky....          _               110       600       8. 0     15.4      11.0  .....       ----..............                              100   1916
     30     339. 4   3.3 miles below Greenup, Ky____                                                                       _ . do do.. . . . . . -----     do-------------
                                                                                                                                                                                       100
                                                                                                                                                                                                       1, 088,   801.73
                                                                              110       600       7. 5     15.4      11.0  -----  do-------------   ..... do.---------                       1923      1, 579,   617. 80
     31     359. 3   3.3 miles below Portsmouth, Ohio. ........               110       600       7. 5     15.4      11.0  .- do _ -- . -- .          ._ _do-----------.               100   1919      1,359,    230. 62
     32     382. 6   1 mile above Rome, Adams County,.Ohio._                  110       600       7. 5     15.4      11.0   Piles in sand and         Caissons on gravel               100   1926      2, 951,   215.97
                                                                                                                                gravel.                  and clay.
     33     405. 1   3.5 miles above Maysville, Ky _............              110       600       7.0      15.4      11.0                            Piles in sand and                 100   1921      1, 872, 868.31
                                                                                                                           ....--   ------------
                                                                                                                                  do_
                                                                                                                                                         gravel.
     34     434. 1   Chilo, Ohio ..................... ...........            110       600       5. 6     15.4      11.0        'do._
                                                                                                                                --..              . -.. do.----------                  100   1925      3, 437,056. 58
     35     451.0    1 mile below New Richmond, Ohio......_.--                110       600       6.4      15. 4     11.0      --do_-- - - - - Ro-do.----------                        100   1919      1, 894, 942. 52
     36     460. 9   9.3 miles above Cincinnati, Ohio............             110       600       7. 9    S15. 4     11. 1 --- do .--- -- -- --         . .d
                                                                                                                                                          _ o-_- -- - -- -             100   1925      3, 704, 534. 91
a    37     483. 2   Fernbank, Ohio_..........                                110       600       7.8      12.3      11.0   Rock. .. _........        Rock_ _.___---_                  100   1911      1, 297, 923. 86
:    38     503. 3   Maxville, Ky_.. _                                        110       600       7.3      15.4      11. 0 Piles in sand andi Piles in sand and                        100   1924      2, 857, 040. 24
                                                                                                                                gravel.                  gravel.
     39     531.7    1 mile above Markland, Ind-...............               110       600       6. 0     15. 4     13.0 --..do -....- .....- Rock and piles in                       100   1921      2, 222, 447. 98
                                                                                                                                                         sand and gravel.
     40              Eliminated ....-.. __ ....    .......   ..
     41
     42
            604. 4   Louisville, Ky................... .........
                     Eliminated _ _
                                                                              110
                                                                              656
                                                                                         600
                                                                                       6 360
                                                                                                 37.0      19.0      11.0     Rock............
                                                                                                                                                            Rock................
                                                                                                                                                            Rock_.--,,,---,            100   1921     7 7, 633, 375. 03
                                                                                                                                                                                                                              O
                                                                                                                                                                                                                               r
     43     633. 2   3.3 miles below West Point, Ky..... .......              110                 9.0      15.4       11.0                    Pile----- ...........
                                                                                                                              Pile-----------------                                    100   1921      2, 587, 731.88
     44     663. 2   Leavenworth, Ind___                                      110       600
                                                                                        600       7.0      15. 4      13. 0   Pie __do...-------.-   Rock and pile...-..               100   1925      2,818, 763. 39
     45     703. 0   Addison, Ky----                                          110                 9.0      17.4       13.0    Rock-................ ___do.....-.........-              100   1927       3,161,182.26
     46     757. 3   Owensboro, Ky ................... ........               110       600                17.4               Pile .__ .... __-                   ----........                                                 0
                                                                                        600      11.0                 11.0                           Pile__...                         100   1928       3, 121,479. 50
     47     777. 7   New burg, Ind ---.......................                 110                 9.0      15.4       11.0     ..----
                                                                                                                                 do............               --------
                                                                                                                                                                  do                   100   1928      4, 415, 525. 82
     48     809. 6   5.8 miles below Henderson, Ky..............              110       600       7. O0    15.4       13.0    ..... do . ....... ... ..... do------------              100   1922
                                                                                        600                                                                                                            3, 062, 699.94
     49     845. 0   2.5 miles below Uniontown, Ky.............               110                11.0      17.4       13.0     Rock............        Rock ..............             100   1928      3, 292, 682. 22
     50     876. 8   1 mile below Weston, Ky_ --...............               110       600
                                                                                        600      10.0      17.4               ....do . ....                                            100
                                                                                                                      11.0                             Rock and pile- ...                    1928      3,722,186.73
     51     903. 1   0.6 mile below Golconda, Ill.............__              110       600       8.0      15.4       11.0     Rock and boulders _ Pile ... ....              ......   100   1929      4, 370, 566. 20
     52     938. 9   1.4 miles below Brookport, Ill.-__.--.--.-.              110       600      12. 0     15.4       11.0     Pile _----
                                                                                                                                     _     .-- -- -   .----- do............--          100   1928      4, 462, 836. 79
     53     962. 6   10.8 miles above Mound City, Ill............             110       600      13. 4     15.4      8 9. 6     - do- .......... .--    - do ..                  .     100   1929      5, 413, 867. 94
                                                                                                                                                                                                                               0
     54     974. 2   M ound City, Ill .---......................              110       600      (9)       (9)       (9)       Rock........__.         Gravel..                          0                  (1o)

                                                                                                                                                                                                      11122,421,734.00         N
         1 Actual costs except Emsworth and Montgomery Island locks and dams which are estimated.
         2 New fixed dam replaces movable dams nos. 4, 5, and 6.                                                                                                                                                               -'
         3 Will change to 5.6 feet when Gallipolis dam is completed and dams 24, 25, and 26 are removed.                                                                                                                       O


          +Will change to 13.5 feet when Gallipolis Dam is completed and dams 24, 25, and 26 are removed.
         5 New roller gate dam.     Will replace existing movable dams nos. 24, 25, and 26. Parallel locks completed and dam under construction. Estimated cost not included in total as                                       0
    it is being constructed under project for improving lower Kanawha.
         6 Clear width and length of new auxiliary lock.
         7 Completed with large new lock in 1921.       Completed with new dam and raised canal and lock walls in 1928. Construction of an auxiliary lock commenced in 1929, which lock
     was completed in 1930.
         8 Dam below not commenced.         Depth on lower miter sill at low water.
         o Necessity for construction has not yet been determined.
         10Not commenced.
         11 Exclusive of $6,634,135.17; details below.
                                                                           ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT
    Repair station, Marietta, Ohio ..........--------------                                                                                                                                              $178, 700. 00
                                                                                                                                                                                                         $----------------------------
    Louisville and Portland Canal and Indiana chute (under previous project)..----------------------------------------------------------------------                                                    5, 359, 203.17
    Repairs to Sand Island Dike, Louisville, Ky. (maintenance) ....                                                                                                                        ......               000. 00
                                                                                                                                                                                                           13 000.   00----------------------------
    Examinations, surveys, contingencies, plant, and miscellaneous.................................................--------------------------------------------------------------------------------        966, 232.00

                                                                                                                                                                                                        6, 634, 135. 17
          Total------------------------------...........................................................--------------------------------------------------------------------........                  129, 055, 869. 57
1056          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                        Principal towns and cities along the Ohio River

                                Miles                                           Miles                                 Miles
        Location                below                 Location                  below            Location             below
        Location                                                                                 Location
                                Pitts-
                                PiLocation
                                                                                Pitts-                                Pitts-
                                burgh                                          burgh                                  burgh


Pittsburgh, Pa---......._ ---------          Ironton, Ohio-----------            327. 2   Cannelton, Ind---------      724.0
Ambridge, Pa--.........            15.9      Portsmouth, Ohio--    ..            356.0                  .......
                                                                                          Rockport. Ind--              747. 2
Aliquippa, Pa..                    20.0      Maysville, Ky ---------             408.6    Owensboro, Ky --------       756.5
East Liverpool, Ohio__             43. 5     Newport, Ky-----------              469. 8   Newburgh, Ind---------       778. 0
Steubenville, Ohio- ....           68.0      Cincinnati, Ohio--------            470. 2   Evansville, Ind ........     792. 3
Wheeling, W. Va ......             90.5      Covington, Ky .......               470.5    Henderson, Ky---------       803.9
Bellaire, Ohio....-----------      94. 5     Lawrenceburg, Ind        .          492.9    Mount Vernon, Ind .-         829. 1
Marietta, Ohio     -.......       172.0      Aurora, Ind-............
Parkersburg, W. Va..__            184.6      Carrollton, Ky ---..--           - .496. 7
                                                                                 545. 7
                                                                                          Shawneetown, Ill_......
                                                                                          Golconda, Ill ._____-___
                                                                                                                       857. 8
                                                                                                                       902. 5
Point Pleasant, W. Va__           265. 2     Madison, Ind-----------.......      557. 7   Paducah, Ky .------          934. 5
Gallipolis, Ohio-....-..         269. 7      Jeffersonville, Ind_-....... 602. 7          Metropolis, Ill__            943.8
Huntington, W. Va.....           308. 3      Louisville, Ky ..-....       603. 7          Mound City, Ill--------      973.4
Catlettsburg, Ky-....            317.2
                                     2.      New Albany, Ind--.....       608.5           Cairo, Ill_--------------    979. 3
Ashland, Ky........-     -       322.6       Leavenworth, Ind.----.-664.0



   Terminal facilities.-Modern public terminals, with warehouses,
equipped with operating machinery for transferring materials, have
been constructed by private interests at some of the larger cities
and towns.
   The city of Pittsburgh contemplates the construction of an ade-
quate modern terminal with ample facilities for river-to-rail transfer
of freight for general use.
   Operationsand results during fiscal year.-The work accomplished
during the fiscal year and classed as new work and maintenance
 (operating and care) was as follows:
   Regular funds-New work-- Emsworth locks and dam.-During
the fiscal year at Emnsworth locks the operation building was com-
pleted by contract. The masonry work for the piers and sills in the
main channel for raising the crest of the dam was completed and the
first cofferdam removed. Two vertical lift gates and hoisting
machinery were installed between piers nos. 1, 2, and 3, and in the
back channel construction of the first cofferdam was completed by
contract. Fabrication, by contract, of the life gates and service
bridge is practically completed. The cost during the year, all for
new work, was $373,327.86; the expenditures were $373,327.86.
   Montgomery Island locks.-Painting of the service bridge was
completed by contract and the paving of the esplanade completed
by hired labor. The cost during the year, all for new work, was
$68,648.06; the expenditures were $68,648.06.
   Lock no. 23.-Material for revision of wickets, lock no. 23, was
purchased. The cost during the fiscal year, all for new work, was
$12,089.77. The expenditures were $11,972.20.
   Lock and dam no. 41.-The purchase of flowage easements result-
ing from the raising of the pool of dam no. 41 was continued. No
easements were approved for purchase. Payments totalling $8,952.01
were made on claims. The cost during the fiscal year, all for new
work, was $13,977.85; the expenditures were $13,480.44.
   Maintenance (operating and care).-The locks and dams were
operated as required, and the necessary repairs made thereto and to
the appurtenant structures. The cost during the fiscal year was
$2,706,824.99, which includes minus $3.95 from the permanent in-
definite appropriation; the expenditures were $2,737,898.56, which
includes $544.65 from the permanent indefinite appropriation.
      RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS               1057
   The total costs during the fiscal year from regular funds were
$3,174,868.53 (which includes minus $3.95 from permanent indefinite
appropriation), of which $468,043.54 was for new work and $2,706,-
824.99 for maintenance (operating and care). The total expendi-
tures were $3,205,327.12, which includes $544.65 from the permanent
indefinite appropriation, of which $467,428.56 was for new work and
$2,737,898.56 for maintenance (operation and care).
   Public Works funds-Montgomery Island dam.-Operations fron
Public Works funds consisted of the purchase of land and flowage
easements and settlement of prior contract obligations. The cost
during the fiscal year, all for new work, was $1,561.25; the expendi-
tures were $61,715.65.
  Emergency Relief funds-Emsworth locks.-Operations per-
formed from funds allotted by the Emergency Relief Administration
were applied to contract work similar to that performed under
regular funds. The total cost during the fiscal year, all for new
work, was $566,367.86; the expenditures were $522,302.76.
   The total cost during the year, all funds, was $3,742,797.64, which
includes minus $3.95 from the permanent indefinite appropriation, of
which $1,035,972.65 was for new work and $2,706,824.99 for mainte-
nance (operating and care). The total expenditures were $3,789,-
345.53, of which $1,051,446.97 was for new work, $2,737,353.91 for
maintenance (operating and care), and $544.65 for operating and
care from the permanent indefinite appropriation.
   Condition at end of fiscal year.-The completed system now com-
prises 47 locks and dams. The raising of the crest of Emsworth
Dam and alterations to Emsworth locks are approximately 65 per-
cent complete. Dashields and Montgomery Island locks and dams
are practically completed. All of the structures are in operation,
thereby providing 9-foot navigation throughout the entire length of
the river. At certain locations where gravel deposits or obstructive
bars exist, dredging operations, supplemented by contraction works,
are executed in order that the full project depth may be afforded at
all times. The table under paragraph Existing project shows the
year of completion of locks and dams now in operation. The fixed
dam now under construction at Gallipolis, Ohio (under the Kanawha.
River project), will replace existing dams nos. 24, 25, and 26. The
riverward lock of the Gallipolis twin locks is in operation. The
operation of lock no. 26 has been discontinued. Removal of locks
nos. 25 and 26 was in progress at the end of the fiscal year.
   The total cost of existing project to the end of the fiscal year was
$113,249,947.77, of which $109,059,073.88 was for new work, $130,000
for maintenance, and $4,060,873.89 for operating and care. Of the
total cost, $109,013,119.84 was from regular funds, of which $104,-
841,245.95 was for new work and $4,171,873.89 for maintenance;
$3,258,367.59 from Public Works funds, all for new work; and $978,-
460.34 from Emergency Relief funds, of which $959,460.34 was for
new work and $19,000 for maintenance. The total expenditures under
the existing project were $113,004,535.29, of which $108,857,997.52 was
from regular funds, $3,258,367.59 from Public Works funds, and
$888,170.18 from Emergency Relief funds. In addition the sum of
$38,374,501.58 was expended between October 7, 1885, and June 30,
1937, on the operation and care of the works of improvement under
1058       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the provision of the permanent indefinite appropriation for such
purposes.
  The total cost and expenditure on previous 6-foot canalization, the
works of which were incorporated in the above, was $17,657,273.78,
making a total cost of $126,716,347.66 for new work.
  Proposed operations--Regular funds.-The balance unexpended,
including accounts receivable together with an allotment of $2,218,470
made in July 1937, will be applied as follows:
Accounts payable---------------                                      ------   $239, 403. 99

New work :
   Emsworth locks:
       Purchase and installation of hydroelectric unit, standby
         units, and electrical distributing system and cranes
         by hired labor (July 1 to Oct. 31, 1937)------------                    90, 000. 00
       Repair emergency dam sill and gates by contract (July
         1, 1937, to May 30, 1938)                                               50, 000. 00
   Emsworth Dam:
       Complete masonry work of dam by contract (July 1 to
         Nov. 30, 1937)                                                         180, 000. 00
       Construction and installation of gates, hoisting machin-
         ery, and emergency bulkheads, by contract (July 1,
         1937, to Apr. 30, 1938)-_---620,                                              000.00
       Cutting down crest of existing dam and resurfacing, by
         contract.(July 1, 1937, to June 30, 1938) ---..,------                  75, 800. 00
   Montgomery Island Dam: Paint service bridge, by contract
     (July 1 to Aug. 31, 1937)      ------------------------                      5.      . ))on
   Dam no. 23: Complete modifying Bebout wickets----------                       19, 173. 00
   Dam no. 41: Purchase of flowage easements----------_                          12, 500. 00
       Total for new work         --------------------------------            1, 052, 473. 00
Maintenance (operating and care) :
   Operation of locks and dams_--_______________________               1, 663, 392. 00
   Ordinary maintenance and repairs _____                  _____....__    186, 954. 37
   Improvement and reconstruction ______-.
   Channel work------------------------------------------
                                                            __________    429, 992. 00
                                                                            1, 500. 00
    Special work -----------------------------------------                 15,105. 62
   Emergencies ------------------------------------------                   5, 000. 00
       Total for maintenance (operating and care) ---------  2, 301, 943.99
     Balance remaining ----------------------------------------       73. 28
       Total, including accounts payable--------------                        3, 593, 894. 26
  Emergency Relief Administration funds.-The obligated balance
($330,829.82) of funds allotted from the Emergency Relief Appro-
priation Act of 1935 will be applied as follows:
Accounts payable ------       _------------------------------- $90, 549. 60
New work: Partial raising crest of Emsworth Dam by contract
  (July 1 to Nov. 30, 1937)------- -____,,_-__-240,                                    280. 22

       Total, including accounts payable ________________                       330, 829.82
  The additional sum of $3,970,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1939, to be applied as follows:
New work :
   Emsworth locks: Reface and armor 56-foot lock under con-
     tract (July 1 to Oct. 1, 1938) -------------------------- $150, 000. 00
                                ------
   Dam no. 14: Raising crest _....__-____               _____-          250, 000. 00
   Locks and dams nos. 45, 46, 49, and 50: Complete modifica-
     tion of---                      ...--..
                       -----------------------                           70, 000. 00
        Total, new work-                        ---          --         470, 000. 00
                                                          ___...------------------
             RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS                                                             1059
Maintenance (operating and care) :
   Operation of locks and dams_-------------                                                          $1, 595, 000.00
   Ordinary maintenance and repairs .___________---------                                                 235, 000. 00
   Improvement and reconstruction-----------------------                                               1, 580, 000. 00
   Channel work ....- ____      ___-----______          ____
                                                       -------                                             85, 000. 00
   Emergencies                                                                                                 000. 00
                                                                                                            5----------------------------

           Total for maintenance (operating and care) ----------                                          3, 500, 000. 00
           Total for new work and maintenance------------------3, 970, 000.00

                                           Cost and financial summary
                                 MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937----------------------                                           $122, 498, 519. 73
Cost of maintenance to June 30, 1937---------------------                                           42, 546, 377.12
      Total cost of permanent work to June 30, 1937                                     _____       165, 044, 896. 85
Undistributed costs June 30, 1937                                                                         78, 229.21
      Net total cost to June 30, 1937_                              123, 126. 06
                                                              1---------------------65,
Plus accounts receivable June 30, 1937_----------------------          6, 050. 81
     Gross total costs to June 30, 1937-------------------                                          165, 129, 176. 87
Minus accounts payable June 30, 1937___ ________ --                                                      239, 403.99
     Net total expenditures---------------------------                                            2164, 889, 772. 88
Unexpended balance June 30, 19371------------------------                                              , 369, 373.45
           Total amount appropriated to June 30, 1937-----------                                    166. 259. 146. 33

   Fiscal year ending               1933               1934              1935              1936                    1937
         June 30


Cost of new work-.....          $1,392, 328. 45    $1, 154, 455. 76    $264, 627. 63     $195, 511. 39          $468, 043. 54
Cost of maintenance--.           2, 549, 458. 54    2, 333, 249. 44   2, 815, 442. 08   1,423, 184. 23       s 2, 706, 824. 99

       Total cost.......         3, 941, 786. 99    3, 487, 705.20    3, 080, 069. 71   1, 618, 695. 62          3, 174, 868. 53
Total expended--------.......    4, 027, 608. 81    3, 402, 503. 83   2, 954, 779. 39   1, 546, 548. 36      4   3, 205, 327. 12
Allotted--------------           5, 352, 089. 18    2, 493, 348. 75   4, 868, 493.00    3, 236, 524. 77          -153, 706. 10


Balance unexpended July 1, 1936 ......                                                                $4, 728, 406. 67
Amount allotted from War Department Appropria-
  tion Act approved Apr. 9, 1935________    ___ $1, 500.00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936 ----------   __ 275, 20.00
                                                                                                            276, 700. 00

      Amount to be accounted for ______________       __   __                                             5, 005, 106. 67
Deduction on account of revocation of allotments __-_____- _                                                 430, 406. 10
       Net amount to be accounted for__-          -                               -___ -________4, 574, 700. 57
Gross amount expended___          ________----$3                                   364,537.29
Less :
    Reimbursements collected -----       $153, 697.10
    Receipts from sales -----------          5, 513. 07
                                                                                 159, 210. 17
                                                                                                          3, 205, 327. 12
           Balance unexpended June 30, 1937_____                                                             369, 373. 45
                                                                                                          1----------1,
   1 Includes costs of $38,374,503.23 from permanent indefinite appropriation.
   2 Includes expenditures of $38,374,501.58 from permanent indefinite appropriation.
   8 Includes  -$3.95 from permanent indefinite appropriation.
   ' Includes      $544.65 from permanent indefinite appropriation.
1060                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937-- ----.                                                                       $239, 907. 85
Amount covered by uncompleted contracts------                                                                        814, 786. 27
                                                                                                                                                        $1,054, 694. 12

      Balance available June 30, 1937__....                                                               _........_.                    _                    314, 679. 33
Accounts receivable June 30, 1937----                                                               ---     ---------                                           6, 050. 81

     Unobligated balance available June 30, 1937 _------                                                                                                    - 320, 730.14
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937------. ---- . _--    - .- -  --                                                                                        -        2, 218, 470.00
                                                    ..
              Balance available for fiscal year 1938_---                                                                     -..             -              2, 539, 200.14
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 6- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                                       -
                                                                                                                                                               470, 000. 00
  For maintenance                               _____________________________________                                                                       3, 500, 000. 00
                            - - - - - - - - -        - - - - - - - - - - - - - -- --- ---- --                               - - - -   - -- - --
              Total                                                                                                                                         3, 970, 000. 00
   " Exclusive             of available funds.

                                                                  PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937_.....                                                                      -__ ___---------                           $3, 258, 367. 59
Cost of maintenance to June 30, 1937_                                                                                                              ----- ---
         Total cost of permanent work to June 30, 1937 ----                                                                                  -          3, 258, 367. 59
          Net total expenditures-   -------------    --------                                                                                           3, 258, 367. 59
          Total amount appropriated to June 30, 1937---                                                                                                 3, 258, 367. 59

Fiscal year ending June 30                               1933                        1934                         1935                           1936               1937

Cost of new work___-.......                    ...............                    $332,417. 11              $1, 843, 750. 87            $1, 080, 638. 36           $1, 6561.25
Cost of maintenance                                        ..............................................................
                                                                                          --                 -------                    ---------------...
Total expended------------...........................                               273, 225. 30             1, 766, 692. 87             1, 156, 733. 77           61,715. 65
Allotted-------------------...................---------..............           3, 145, 000. 00                   72, 494. 60                    47, 800. 00      -6,927.01


Balance unexpended July 1, 1936 ______ -    -    - __ --   _-                                                                                                 $68, 642. 66
Deductions on account of revocation of allotment ------------                                                                                                   6, 92T. 01

       Net amount to be accounted for-. --     -----      --                                                                                                   61, 715. 65
(Gross amount expended___- -------                $82, 400.12
Less reimbursements collected-----------------      20,684.47
                                                                                                                                                               61, 715. 65

                                                                 EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937______-- -__-____     _____-                                                                                                $959, 460. 34
Cost of maintenance to June 30, 1937---------------------                                                                                                      19, 000.00
      Total cost of permanent work to June 30, 1937 _-----                                                                                              -     978, 460. 34
Plus accounts receivable June 30, 1937 -----------------                                                                                                           259. 44

       Gross total costs to June 30, 1937--__-__-____-_ -                                                                                          -_         978, 719. 78
Minui s accounts payable June 30, 1937_ _____________ -                                                                                      _                 90, 549. 60

             Net                                  __--___-__________-
                         total expenditures --------                                                                                       _                  888, 170. 18
Unexi pended balance June 30, 1937----______________ ______                                                                                                   330, 829. 82

             Total amount appropriated to June 30, 1937-----------                                                                                          1, 219, 000. 00
            RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS                                                                                1061

    Fiscal year ending June 30                      1933                1934                1935              1936                 1937


Cost of new work------------...............-..----                                          .$393,092.48                         $566,367.86
                                        -------
Cost of maintenance------------............                                                -------------
                                                                            .......--------------            19,000.00 -              --
       Total cost-----.......------------...........--------------.....--..........----------------         412,092.48               367.86
                                                                                                                                  566,
Total expended_-._-----..-.----                 ------                  -          ---------------          365, 867. 42          522, 302. 76
Allotted.........--------------------------------------- $1, 200,000.00
                                                 ...........                                                 19,000.00 ..............


Balance unexpended July 1, 1936---------------------------                                                                 $853, 132. 58
Gross amount expended ---------   ----          $542,429. 10
Less reimbursements collected------------------20, 126. 34
                                                                                                                            522, 302. 76

      Balance unexpended June 30, 1937---------------------                                                                 330, 829. 82
Outstanding liabilities June 30, 1937------------- $18,102.95
Amount covered by uncompleted contracts ------- 312, 726. 87
                                                                                                                            330, 829. 82
     Balance available June 30, 1937-----------------------
Accounts receivable June 30, 1937--------------------                                                -----                          259.44

          Unobligated balance available June 30, 1937-------------                                                                  259. 44

   CONSOLIDATED            COST AND FINANCIAL SUMMARY FOR OHIO RIVER LOCK AND DAM
                                           CONSTRUCTION

Cost of new work to June 30, 1937------------------------- $126, 716,347.66
Cost of maintenance to June 30, 1937----------------------- 42, 565, 377. 12
      Total cost of permanent work to June 30, 1937---------                                                         169, 281, 724. 78
Undistributed costs June 30, 19371111                                                                                      78, 229.21

      Net total cost to June 30, 1937----------------------169, 359, 953. 99
Plus accounts receivable June 30, 1937                             ,310. 25
                                                                  6----------------------

     Gross total costs to June 30, 1937---________ -____    169, 366, 264. 24
Minus accounts payable June 30, 1937 ----------------------      329, 953. 59

     Net total expenditures-  --- ---------------------- 2169, 036, 310. 65
Unexpended balance June 30, 1937------------------------    1, 700, 203.27
          Total amount appropriated to June 30, 1937                                      -----------             170, 736, 513. 92

  Fiscal year ending                  1933                     1934                  1935                  1936
         June 30                                                                                                                  1937


Cost of new work-.....           $1,392, 328. 45         $1,486,872.87           $2, 108, 378. 50   $1, 669, 242. 33         $1,035,972.   65
Cost of maintenance._             2, 549, 458. 54         2, 333, 249. 44         2, 815, 442. 08    1, 442, 184. 23         3 2,706, 824. 99

       Total cost- ... _          3, 941, 786. 99          3, 820, 122. 31        4. 923, 820. 58     3, 111, 426. 46           3,742, 797. 64
Total expended.....--------       4, 027, 608. 81          3, 675, 729. 13        4, 721, 472. 26     3,069, 149. 55        +   3, 789,345. 53
                          5,352, 089. 18
Allotted-- .............----------                         5, 638, 348. 75        6, 140, 987.60      3, 303, 324. 77           -160,    633. 11


   SIncludes       costs of $38,374.503.23. from permanent indefinite appropriation.
   2 Includes      expenditures of $38,374,501.58 from permanent indefinite appropriation.
   * Includes      -$3.95   from permanent indefinite appropriation.
   4 Includes      $544.65 from permanent indefinite appropriation.
1062        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance   unexpended July 1,           1936_         ____________________                                   $5,650, 181. 91
Amount    allotted from War             Department Appropri-
  ation   Act approved Apr.            9, 1935_______________    $1, 500. 00
Amount    allotted from War             Department Appropri-
  ation   Act approved May             15, 1936----____         275.200. 00
                                                                                                               276, 700. 00

      Amount to be accounted for ___________________                                                         5, 926, 881.91
Deductions on account of revocation of allotments ------------                                                  437, 333. 11

      Net amount to be accounted for   ___                                  ______                           5, 489, 548. 80
Gross amount expended__ _---_----    _____---                               $3, 989, 366. 51
Less-
    Reimbursements collected---_ $194, 507. 91
    Receipts from sales-------- --- 5, 513.07
                                                                                  200, 020. 98
                                                                                                             3., 789.345.
                                                                                                                  - +, .. 53.

      Balance unexpended June 30, 1937_                                                                      1, 700, 203. 27
Outstanding liabilities June 30, 1937______                                      $258, 010. 8 0
Amount covered by uncompleted contracts_                                      1, 127, 513.1 4
                                                                                                             1, 385, 523. 94

     Balance available June 30, 1937                           _                                               314, 679. 33
Accounts receivable June 30, 1937_____--                           __----------__                                6, 310. 25

     Unobligated balance available June 30, 1937_                                                              320, 989. 5S
Amount    ''allotted
                from War Department Civil Appropriation
Act approved July 19, 1937--------------------------------                                                  2, 218, 470. 00

        Balance available for fiscal year 1938                                                               2, 539, 459. 58

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work ---------- _________________________------                                                      470, 000. 00
   For maintenance ---------------------------------------                                                   3, 500, 000. 00
                            ---- ------ --   - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - -
        Total 5 - - - - -                                                                                    3, 970, 000. 00
  5 Exclusive of available funds.

                            2. OPEN CHANNEL WORK, OHIO RIVER

   Open-channel work on the Ohio River is in charge of the district
engineer in whose district the work is located.
   Information as to the limits of the four districts on the Ohio River,
as well as the district engineers in charge thereof, is contained on
page 1051. The limits shown for construction of locks and dams
apply, except that the improvement of the channel of the Ohio River
from its mouth to the mouth of the Cache River (Mound City, Ill.),
other than by construction of locks and dams, is under the jurisdic-
tion of the Mississippi River Commission.
   Existing project.-The project adopted by the act of March 3, 1827,
originally covered the entire length of the Ohio River from its mouth
near Cairo to Pittsburgh, a distance of 981 miles. With the comple-
tion of the canalization project, the work under the project for open-
channel work consists mainly of removing obstructive bars and
widening and deepening the channel at the upper ends of pools where
necessary in order that the full project depth of 9 feet contemplated
by the canalization project may be obtained. After this depth has
been obtained it is anticipated that periodic dredging will be required
      RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS               1063
at some localities in order to maintain such depth. In addition, the
depth is being maintained on that section of the river below Lock and
Dam No. 53 by open-channel work.
   Under the project for open-channel work no project depth had
been fixed by Congress, but it was found necessary to properly aid
packet and barge navigation, prior to completion of the canalization
project, to secure a low-water channel having a minimum depth of
from 4 to 6 feet and a width, according to the difficulty of running
the channel, of from 400 to 600 feet; and to permit the movement of
large coal tows, which movement occurs at stages of water exceeding
10 feet, it has been found necessary to remove the points of projecting
bars which form at various points along the river but mainly at the
mouths of creeks and other tributaries. The accomplishment of this
twofold purpose involves the concentration of current by closing back
channels at islands with low dams, the contraction and straightening
of wide, open channels by low dikes, the dredging of bars and shoals,
and the removal of snags and wrecks.
   The River and Harbor Act approved January 21, 1927, authorized
the construction of ice piers as a part of the project for open-channel
work, these piers to be constructed with funds allotted from the appro-
priations for general open-channel work (H. Doc. No. 187, 67th Cong.,
2d sess.).
   The River and Harbor Act, approved July 3, 1930, authorized re-
forestation of the sloughs on Kentucky Peninsula near Evansville,
Ind., and a 200-foot strip along the upstream bank and for bank pro-
tection, at an estimated cost of $200,000 (H. Doc. No. 409, 69th Cong.,
1st sess.). This document contains a map of the locality.
   The extreme range of river stages varies from 46.0 feet at Pitts-
burgh, Pa., to 80.0 feet at Cincinnati, Ohio, with 57.2 feet at Louis-
ville, Ky. (head of the falls), 53.8 feet at Evansville, Ind., and 59.5
feet at Cairo, Ill. (mouth of the river).
   Incidental to the direct improvement of the Ohio is the mainte-
nance of existing works, including dikes, dams, and ice piers; also
harbor lines below mouth of Big Sandy River.
   Operation of snag boats on the Ohio River below the Pennsylvania
State line was included in the project July 1, 1935, under the provi-
sions of the Permanent Appropriations Repeal Act approved June
26, 1934.
   The estimated cost of new work, revised in 1933, is $17,050,000)
which includes $200,000 for bank-protection work near Evansville,
Ind., authorized in the 1930 River and Harbor Act. The estimate
of annual cost of operating snag boats below the Pennsylvania State
line, made in 1936, is $50,000.
   Local cooperation.-The River and Harbor Act approved January
21, 1927, authorizing the construction of ice piers for general open-
channel work, imposes the condition that before work is begun on
any ice pier, local interests convey to the United States free of cost
such riparian rights as may be deemed necessary in connection with
the improvement at the locality.
   The River and Harbor Act approved July 3, 1930, authorizing the
reforestation of the sloughs on Kentucky Peninsula near Evansville,
1064      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Ind., and a 200-foot strip along the upstream bank and for bank
protection, provides that no expense shall be incurred by the United
States for the acquiring of any lands required for the purpose of this
improvenient.
  Terminal facilities.-See page 1056.
   Operations and results during fiscal year.-Dredging, where re-
quired to provide an adequate and dependable channel of project
depth at minimum pool conditions, was executed. The work accom-
plished during the year was as follows:
   Pittsburgh district.-Fifty-seven thousand eight hundred fifty-eight cubic
yards of dredged material were removed by the U. S. dredge Allegheny at
Cluster's Island, a distance of 52.5 miles below Pittsburgh. Thirteen thousand
five hundred cubic yards of dredged material were removed by the U. S. dredge
Allegheny at Beach Bottom Bar, a distance of 77.9 miles below Pittsburgh.
Channel buoys were inspected and cleaned at regular intervals and missing
buoys replaced. The cost during the fiscal year was $29,865.59, all for main-
tenance. The amount expended was $31,361.23.
   Huntington district.-Dredging of the channel at head of Letart Islands was
completed, 29,065 cubic yards of material having been removed. The lower
approach to lock no. 18 was dredged, 5,710 cubic yards of material having been
removed. The harbor at Marietta, Ohio, was dredged, 16,638 cubic yards of
material having been removed. The riverward lock chamber and lock ap-
proaches at Gallipolis locks were dredged, 5,885 cubic yards of material having
been removed. The upper and lower approaches, lock no. 23, were dredged,
11,600 cubic yards of material having been removed. The channel at Grape
Island in pool 17 was dredged by contract, 157,261 cubic yards of material
having been removed. The routine work of maintaining channel buoys, making
dredging surveys and removing snags was performed as required. The cost
during the fiscal year was $101,837.97, all for maintenance. The expenditures
were $104,999.45.
   Cincinnati district.-Dredging of 810,289 cubic yards of material was accom-
plished by the U. S. pipe-line dredges Major J. C. Mallery and Jewett, and the
U. S. dipper dredge Cincinnati, all of which was removed from the channel.
The snagging plant of the district removed and disposed of 2,533 trees and
snags, 21,249 tons of silt, and the wrecks of 20 vessels. Other open-channel
work in the Cincinnati district included periodic examinations and inspections
of the channel, detailed surveys of critical bars, and maintenance of certain
navigation aids. The cost during the fiscal year was $350,562.63, all for
maintenance. The expenditures were $341,962.86.
   Louisville district.-Dredging was carried on by hired labor to maintain the
project depth in the channel at bars where fill occurs after each extended rise
in the river, and to improve the channel where necessary to facilitate navigation
or to provide a safe channel. The quantity of material removed was 4,845,534
cubic yards. The routine work of maintaining channel buoys, existing dikes,
and bank revetments, and snagging operations was performed as required. A
total of 150 snags was removed from the river. The cost during the fiscal
year was $849,185.04, all for maintenance. The expenditures were $931,942.59.
  The total cost during the fiscal year on the entire river was $1,331,-
451.23, all of which was for maintenance work performed with
regular funds. The total expenditures, all from regular funds, were
$1,410,266.13.
   Condition at end of fiscal year.-Dredges and snagging plant were
operated throughout the year with a view to providing an adequate
and dependable channel 9 feet deep at minimum pool conditions.
In general, this channel was maintained. Local stabilization of chan-
nel has been effected at various points by construction of dikes and
bank revetment.
  The total cost of existing project to the end of the fiscal year for
new work was $12,256,748.86, of which $1,040,235.99 was applicable
to work performed with Public Works funds and $11,216,512.87 from
         RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS                                 1065
regular funds. In addition, the cost of maintenance from regular
funds was $13,301,268.04, making a total cost of $25,558,016.90. The
total expenditures under the existing project were $25,514,268.68, of
which $1,040,235.99 was from Public Works funds and. $24,474,032.69
from regular funds.
   In addition the sum of $1,621,349.38 was expended between Septem-
ber 19, 1890, and June 30, 1936, in the operation of snag boats under
the provision of the permanent indefinite appropriation for such
purposes.
  Proposed operations---Regular funds.-The balance unexpended,
including accounts receivable on June 30, 1937, together with an al-
lotment of $1,309,530 made during July 1937, will be applied as fol-
lows:
Accounts payable---------------------------------------------            $45, 687. 10
New work: Revetments-----------------------------------                  300, 000. 00
Maintenance:
    Dredging
          Degn-------------------------------89      $819, 517.
                                                             1.3  38
   Maintenance of dikes and revetment--------         100, 000. 00
    Surveys and aids to navigation                      0, 000. 00
                                                       8----------------
    Hydrographic surveys --------------------          80, 000. 00
    Office study of bars and channels and completion
      of model study-Pryors Island Reach---------      15, 000. 00
    Snagging------------------------------------26, 320. 00
                                                           -     -           1, 120, 837. 38

      Total, including accounts payable------------------------1, 466, 524. 48
  The additional sum of $2,500,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1939, to be applied as follows:
New work: Construction of dikes and revetment-------------------$350, 000
Maintenance :
    Dredging--------------------                       $1, 947, 000
   Dikes and revetment ------------------------------       15, 000
    Surveys and channel marking -----------------           72, 000
   Hydrographic surveys-----------------------------        85, 000
    Snagging -----------------------------------------
                                       __                   31, 000
                                                                         -      2, 150, 000

       Total--     ----                                -                        2, 500, 000

                             Cost and financial summary
Cost of new work to June 30, 1937 ------------------------- $12, 256, 748. 86
Cost of maintenance to June 30, 1937------------------------2 14, 922, 617. 42
      Total cost of permanent work to June 30, 1937        ---------     27, 179, 366. 28
Undistributed costs June 30, 1937----------------------------                      57. 67
      Net total cost to June 30, 1937__------------------------_         27, 179, 423. 95
Plus accounts receivable June 30, 1937-      _-----                  _
                                                             -___-______       1, 881. 21
      Gross total costs to June 30, 1937-----,-------------              27, 181, 305. 16
Minus accounts payable June 30, 1937-------------------__                     45, 687. 10
     Net total expenditures------------------------------              1 27, 136, 618. 06
Unexpended balance June 30, 1937--------------------------                   155, 113. 27
       Total amount appropriated to June 30, 1937------------"           27, 290, 731.33
  1 Includes $1,040 235.99 Public Works funds.
  2 Includes $1,621,349.38 for snagboat operations under permanent indefinite apropria-
tions.
1066          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


  Fiscal year ending             1933               1934                1935               1936
4      June 30                                                                                                 1937


Cost of new work...._          $175, 226. 38      $724, 749. 12      $480, 748. 34..
Cost of maintenance...        1, 675, 131. 96   1, 579, 382. 34     1, 154, 205. 26    $1,407,084.
                                                                                                57           $1,331, 451. 23
      Total cost-......       1, 850, 358. 34   2, 304, 131. 46     1, 634, 953. 60     1, 407, 084. 57       1, 331, 451. 23

Total expended--------       1, 39, 080. 47      1, 865, 747. 45    -267, 793. 50       1, 295, 755. 87       1, 410, 266. 13

        --------------
Allotted_                    3, 056, 685. 36    1, 626, 437. 92     -843, 229. 47       1, 282, 503.00          364,800.00


Balance unexpended July 1, 1936---                                                                      $1, 200, 579. 40
Amount .allotted from War Department Appropriation Act
  approved May 15, 1936_______-______---____                                                                384, 800. 00

     Amount to be accounted for _________--_________                                                      1, 585, 379. 40
Deductions on account of revocation of allotment________--                                                    20, 000. 00

      Net amount to be accounted for_                                                                     1, 565, 379.40
Gross amount expended---------------------                                $1,411, 520. 04
Less reimbursement collected                                                        253. 91
                                                                               1,1------------------
                                                                                                          1, 410, 266. 13

      Balance unexpended June 30, 1937_                                                                     155, 113. 27
Outstanding liabilities June 30, 1937_                                                                       45, 895.18

     Balance available June 30, 1937__    ___                                                               109, 218. 09
Accounts receivable June 30, 1937____________                                                                 1, 881. 21

     Unobligated balance available June 30, 1937_                                                           111, 099. 30
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937___-__- __----_-----_                                                          1, 309, 530. 00

      Balance available for fiscal year 1938-----------------                                             1, 420, 629. 30
Amount (estimated) required to be appropriated for com-
pletion of existing project------------------------                                                      4, 200, 000. 00

Amount that can be profitably expended in fiscal year end-
ing June 30, 1939:
                  - -- -- -- -- ---- ------ ---- -- ------ ------
   For new work 1                                                                                            350, 000.00
                       - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -   -
    For maintenance 1                                                  __                                 2, 150, 000. 00

        Total 1 ------------------------------------------------                                          2, 500, 000. 00
   1 Exclusive of available funds.
                          3. OHIO RIVER BASIN FLOOD CONTROL

  Location.-The works covered by this project are a series of dams
and reservoirs located in the following tributary basins of the Ohio
River: Allegheny River, N. Y. and Pa.; Monongahela River, W. Va.
and Pa.; Kanawha River, Va. and W. Va.; Licking River, Ky. The
area included in this project extends from the Allegheny and Monon-
gahela River basins to the mouth of the Licking River on the Ohio,
470.2 miles below Pittsburgh.
  Existing project.-The existing project was authorized by the
Flood Control Act approved June 22, 1936 (H. Doc. No. 306, 74th
Cong., 1st sess.), and provides for the construction of a system of 14
reservoir dams in the Ohio River Valley for the protection of Pitts-
burgh and the reduction of flood heights in the Ohio Valley
generally.
           RIVERS. AND HARBORS-OHIO RIVER LOCKS AND DAMS                                                              1067
  The existing project for the Allegheny-Monongahela River Basin
was amended by act approved April 27, 1937 (Public, No. 51, 75th
Cong.) to provide for such revisions or modifications as may be
found advisable by the Chief of Engineers upon further in-
vestigation.
  The existing project was further amended by sections 1 and 8
of the Flood Control Act approved August 28, 1937 (Public, No.
406, 75th Cong.), as follows:
   Construction of levees, floodwalls, and drainage structures for the protec-
tion of cities and towns in the Ohio River Basin, the projects to be selected
by the Chief of Engineers with the approval of the Secretary of War, in
accordance with the report of the Chief of Engineers in House Committee on
Flood Control Document No. 1, Seventy-fifth Congress, 1st session, at a cost not
to exceed $24,877,000 for construction, which is hereby authorized to be ap-
propriated for this purpose: Provided, That the protection for Pittsburgh,
Pennsylvania, is to be interpreted as applying to the metropolitan district of
Pittsburgh.
   If, in the execution of the project for a reservoir system for the protection
of Pittsburgh, it is found that geological and engineering conditions make it
impracticable to construct a reservoir to provide protection for the city of
Johnstown, Pennsylvania, flood protection shall be -provided for said city by
channel enlargement or other works, provided that the total estimated con-
struction cost of the entire project shall not be increased.
  The estimated cost, revised in 1937, of construction to the United
States is $70,146,305, and the estimated cost of land and damages
is $54,484,494. Tentative data regarding the reservoirs are as
follows:

                                                                                              Construction      Cost of lands
                                                                                                  cost          and damages

Reservoirs for the protection of Pittsburgh:
    Allegheny River Basin:
        Allegheny River Reservoir...................--------------------------------            $12, 755, 675      $13,997, 964
        Tionesta Creek Reservoir-----.... -------------------------                               5, 495, 547        1, 614, 976
        Crooked Creek Reservoir-----.....--.......------------------------------                  5, 241, 394           876, 15&
        French Creek Reservoir------------------------------------                                1, 753, 611        4, 775. 598
        Conemaugh River (Bow site) Reservoir....------------------------                          5, 927, 947        8, 775, 285
        Loyalhanna Creek Reservoir---........-----------------------------.                       2, 521, 806        1, 526, 799
       Mahoning Creek Reservoir--    -------------------------------                              4, 930, 293        1, 243,072
       Red Bank Creek Reservoir..---------------------------------                                3,858,168          5, 575, 307
    Monongahela River Basin: West Fork River Reservoir--------------............. -               2, 509, 864        2, 409, 335
      Total....---------------------------------------------------                               44, 994, 305       40, 794, 494
    Reservoirs below Pittsburgh:
       Kanawha River Basin:
           Clendenin Reservoir (Elk River)--------------------------                              4, 117, 000        8, 559, 000
           Big Bend Reservoir (Greenbrier River) -------------------                              4, 216, 000          898.000
            Bluestone Reservoir (New River) -------------------------                            11, 773,000         1,934, 000
        Licking River:
            Falmouth Reservoir ------------------------------------                               3, 709, 000        1,822, 000
            Cave Run Reservoir .-----------------------------------                               1. 337, 000          477, 000
      Total-------   --
             ...........                  --     ........------..--------------------------      25, 152, 000       13, 690, 000



   Local cooperation.-See page 6 for requirements set forth in
section 3 of the Flood Control Act of June 22, 1936. Section 1 of
the Flood Control Act approved August 28, 1937 (Public, No. 406,
75th Cong.), provides that if, after investigation, the President
finds that any city or town is, by reason of its financial condition,
unable to comply with the requirements of section 3 as to local coop-
eration, he is hereby authorized to waive such requirements on any
1068     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

individual project not to exceed 50 percent of the estimated costs
of the lands, easements, and rights-of-way.
   Operations and results during fiscal year.-The work accomplished
during the fiscal year was as follows:
   Allegheny-Monongahela system.-Detailed surveys, foundation in-
vestigations, and preparatory engineering designs were made for the
following proposed dam sites: French Creek, Allegheny River, Tio-
nesta Creek, Red Bank Creek, Mahoning Creek, Crooked Creek,
Conemaugh River, Loyalhanna Creek, and West Fork River. En-
gineering design, plans, and specifications were completed for two
of the three dams being given prior consideration. Purchase of
plant, equipment, and supplies for the prosecution of preliminary
surveys, model studies, and subsoil investigations of the proposed
dam sites were made. The cost from Emergency Relief funds during
the fiscal year was $631,814.46, all for new work. The expenditures
were $622,427.48.
   Conemaugh River Basin above Johnstown.-Preliminarysurveys,
model studies, and subsoil investigations of proposed dam sites for
the protection of Johnstown, Pa., were made. The cost from emer-
gency relief funds during the fiscal year was $98,842, all for new
w ork. The expenditures were $97,987.68.
   Kanawha system--Bluestone project.--Surveys of the remaining
three land tracts were completed. Permanent monuments were set
on the axis of the dam. Hydraulic and silt ranges on New River,
Bluestone River, and Little Bluestone River were completed. Field
and office work on 51 independently owned land tracts was com-
pleted and acceptable offers from the owners of 39 land tracts were
received. Field appraisals of 117 affected tracts in the reservoir
area were completed. Approximately 500 acres of land were cleared
by the Civilian Conservation Corps. Work under the contract for
constructing a model of dam and model of portion of the spillway
section and experiments was completed January 9, 1937, at a cost of
$19,287.72. Design of the dam proper was continued. The cost
from Emergency Relief funds during the fiscal year was $191,640.04,
all for new work. The expenditures were $191,675.88.
   Big Bend project.-Preliminarysurveys, core borings, appraisals,
and studies were completed. Project report was submitted June 12,
1937. The cost and expenditures from Emergency Relief funds
during the fiscal year were $25,324.37, all for new work.
   Clendenin project.-Preliminarysurveys, core borings, appraisals,
and studies were completed. Project report was submitted Decem-
ber 19, 1936. The cost and expenditures from Emergency Relief
funds during the fiscal year were $9,823.24, all for new work.
   The total cost during the fiscal year from Emergency Relief funds
was $957,444.11, all for new work. The expenditures were $947,-
238.65.
   Condition at end of fiscal year.-Preliminarysurveys, subsoil inves-
tigations, engineering design, plans, and specifications have been
completed for two of the proposed flood-control dams in the Alle-
gheny-Monongahela system. On the Bluestone project (Kanawha
system) core drilling for the dam foundation, surveys of the reser-
voir, and experiments on model of dam and portion of spillway are
complete.   Work in connection with the acquisition of land is
       RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS                                1069
approximately 89 percent complete. Design of the dam is approxi-
mately 93 percent complete. Clearing of the reservoir area is
approximately 46 percent complete. Revised project report on the
Big Bend project covering preliminary surveys, core borings, ap-
praisals, and studies was submitted June 12, 1937. Revised project
report on the Clendenin project covering preliminary surveys, core
borings, appraisals, and studies was submitted December 19, 1936.
  The total cost to the end of the fiscal year from Emergency Relief
funds was $1,310,357.51, all for new work. The expenditures were
$1,299,620.05.
  Proposed operations--Regularfunds,-An allotment of $3,750,000
made during July 1937, will be applied as follows:
New work:
   Allegheny-Monongahela system:
       Preparation of definite plans (surveys, borings, engineering,
         etc. ) --------------        --------------------------            $250, 000
       Part construction of Tionesta Reservoir Dam by contract
          (July 1, 1937, to June 30, 1938)-------           ____--  ______ 1,300, 000
       Part construction of Crooked Creek Reservoir Dam by con-
         tract (July 1, 1937, to June 30, 1938)------------                1,300, 000
       Part construction of Red Bank Reservoir Dam by contract
          (July 1, 1937, to June 30, 1938) ------------------------          900, 000

           Total for all work________________------         ______-            3,750, 000
   Emergency Relief Administrationfunds.-The obligated balance of
funds remaining from the Emergency Relief Administration Act of
June 22, 1936, will be applied to the liquidation of outstanding
liabilities.
   An allotment of $256,500 received during August 1937 from the
Emergency Relief Appropriation Act of 1937, will be applied as
follows:
New work:
   Surveys for additional dams by hired labor (Aug. 10, 1937, to
     June 30, 1938) ----- --     -------------          --___         $95, 000
   Clearing reservoir areas (Tionesta Creek, Crooked Creek, and Red
     Bank Creek) by hired labor (Aug. 10, 1937, to June 30, 1938) ___ 85, 500
   Subsoil investigations at dam sites (Tionesta Creek, Crooked
     Creek, and Red Bank Creek) by hired labor (August 10, 1937, to
     June 30, 1938) ----------------------------------------           76, 000
         Total for all work ________..._________                 ______---_      256, 500
  The additional sum of $12,850,000 can be profitably expended dur-
ing the fiscal year 1939, as follows:
New work:
   Allegheny-Monongahela system:
        Tionesta Creek Reservoir---------------------------$2,100, 000
        Crooked Creek Reservoir__ --- __--         __-------------   2, 000, 000
        Johnstown, Pa.--local protection __________________2, 400, 000
        Conemaugh (Bow site) Reservoir-------------------- 2,200,000
        Loyalhanna Reservoir____--------------------                    800, 000
        French Creek Reservoir-----_----------------------              500, 000
        Mahoning Creek Reservoir____---------------------            1, 500, 000
        Red Bank Creek Reseirvoir__----         ---------------    - 1,350, 000
           Total ----------------------------------------                     12, 850, 000
1070                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                  Cost and financial summary
                                          MAINTENANCE AND IMPROVEMENT                                          FUNDS

    Total amount appropriated to June 30, 1937____________   -------------
Amount allotted from War Department Civil Appropriations Act
  approved July 19, 1937----------_________                   $3,750, 000. 00

     Balance available for fiscal year 1938___________________                                                                         3, 750, 000. 00
Amount (estimated) required to be appropriated for completion
     of existing project 1__--------                                                                                              66, 140, 000.00

Amount that can be profitably expended in fiscal year ending
     June 30, 1939, for new work 1-______                                            -----------                                  12, 850, 000.00
     xExclusive of available funds.
                                                       EMERGENCY                 RELIEF      FUNDS

Cost of new work to June 30, 1937---------------------------                                                                      $1,310,357. 51
Cost of maintenance to June 30, 1937_______                                                                                       -

      Total cost of permanent work to June 30, 1937 ---------- 1, 310, 357. 51
Undistributed costs June 30, 1937____  ---                -____--13,   305. 52

      Net total cost to June 30, 1937____--------------------                                                                          1, 323, 663.03
Plus accounts receivable June 30, 1937 ------------------------                                                                             3, 008. 07

      Gross total costs to June 30, 1937------------------------                                                                       1, 326, 671.10
Minus accounts payable June 30, 1937 --------------------------                                                                            27, 051.05

     Net total expenditures------------------------                                                                                    1, 290, 620. 05
Unexpended balance June 30, 1937----------------------------                                                                              146, 591.47

              Total amount appropriated to June 30, 1937----------___                                                                  1, 446, 211. 52

     Fiscal year ending June 30                           1933                    1934                      1935          1936                1937


Cost of new work___              ......     ___----_...---------.----
                                                          _        _ __.......                ...........              $352, 913.40         $957, 444. 11
Cost of maintenance ...-----------------------.-------------- ----------------------------
Total expended__.._--___-------                      .........--.......-------------                                    352, 381. 40         947, 238. 65

Allotted.............---------   ------------                         -   ----------          --------------            649, 850. 00         796, 361. 52



Balance unexpended July 1, 1936_--------------------------   - $297, 468. 60
Amount allotted from Emergency Relief Administration Act ap-
  proved June 22, 1936--------------------------------------2, 751, 900. 00
     Amount to be accounted for_____                                                                                               3, 049, 368. 60
Deductions on account of revocation of allotments--___________                                                                     1, 955, 538. 48

      Net amount to be accounted for ____________        _______                                                                   1, 093, 830. 12
Gross amount expended__------ ---           __--- $1, 075, 231. 46
Less reimbursements collected-----  _________-127, 992. 81
                                                                                                                                         947, 238. 65

      Balance unexpended June 30, 1937 -------------------                                                                       ---     146, 591. 47
Outstanding liabilities June 30, 1937----------    --------                                                                               32, 009.75
     Balance available June 30, 1937-------------------_--                                                                               114, 581. 72
Accounts receivable June 30, 1937------------------                                                                          _             3, 008. 07

    Unobligated balance available June 30, 1937- -----------                                                                             117, 589.79
Amount allotted during July 1937------      --------                                                                                     256, 500. 00

              Balance available for fiscal year 1938 ----                                                    ------                      374, 089. 79
         RIVERS AND HARBORS-OHIO RIVER LOCKS AND DAMS                                                               1071
CONSOLIDATED       COST AND FINANCIAL SUMMARY FOR OHIO RIVER BASIN FLOOD CONTROL


Cost of new work to June 30, 1937_____________________--                                               $1,310, 357. 51
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937                                                      ,310, 357. 51
                                                                                                        1------------
Undistributed costs June 30, 1937_---   _______-------------                                                13, 305. 52

      Net total cost to June 30, 1937_ ________________-------1, 323, 663. 03
Plus accounts receivable June 30, 1937_                            3, 008. 07

        Gross total costs to June 30, 1937____________________                                          1,326, 671. 10
Minus accounts payable June 30, 1937---------------------                                       ---            27, 051. 05

     Net total expenditures_                             -                                             11,    299, 620. 05
Unexpended balance June 30,                             1937             --           ---   ____              146, 591. 47

        Total amount appropriated to June 30, 1937-------------1, 446, 211. 52

   Fiscal year ending June 30                    1933            1934              1935         1936               1937


Cost of new work _______________                                                             $352, 913. 40       $957, 444. 11
                        - - ....
C ost of m ain tenan ce .... - -...--..
                                     .. ..                 ..
                                                           -. ... .. .. .. .... . ...-......
                                                                                     ---                --- ---- ----------
Total expended          _                               -----                 --      ---     352,381.:40         947238. 65

Allotted_                                                                                     649, 850. 00        796,361.52


Balance unexpended July 1, 1936______________________________                                                $297, 468. 60
Amount allotted from Emergency Relief Administration Act, ap-
proved June 22, 1936 ---------------------------                                                        2, 751, 900. 00
      Amount to be accounted for___ ___________-___---                                                  3, 049, 368.60
Deductions on account of revocation of allotments ______-__-                                            1, 955, 538. 48

         Net amount to be accounted for-------------------------                                         1, 093, 830. 12
                       --
Gross amount expended _-------                                                     $1, 075, 231.46
Less reimbursements collected --                                        ______         127, 992. 81
                                                                                                               947, 238. 65
      Balance unexpended June 30, 1937_______                                                                  146, 591. 47
Outstanding liabilities June 30, 1937____---------                                          ______              32, 009. 75
         Balance available June 30, 1937___________----------
Accounts receivable June 30, 1937__________________
                                                                                                   _           114, 581. 72
                                                                                                                 3, 008. 07

     Unobligated balance available June 30, 1937-------------
                                                           __                                               117, 589. 79
Amount allotted for fiscal year 1938_ _________ ___ - _______-                                           4, 006, 500. 00
     Balance available for fiscal year 1938_______________--   4,124, 089. 79
Amount (estimated) required to be appropriated for completion
of existing project --------------------------------------   66, 140, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939 :                    - - - - - - - - - -- - - - - - - - - - - - - - - -- - - - - - - -
   For new work 2- - - - - - -                                                                               2, 850, 000. 00
   For maintenance 2__

         Total   2-----------------------                                                               12, 850, 000. 00
  1Jncludes $820,172.66 Emergency Relief funds-assistance for educational, professional,
and clerical persons, 1936-37.
   2 Exclusive of available funds.
         20196-37-pt. 1-                    68
1072      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            PITTSBURGH, PA., DISTRICT

  This district includes the watershed of the Ohio River above mile
109, between Captina Island and Powhatan Point, a distance of 109
miles, and includes Emsworth, Dashields, and Montgomery Island
Locks and dams, and dams nos. 7 to 13, inclusive. The rivers in-
cluded in this district are the Monongahela, Pa. and W. Va., the Alle-
gheny, Pa. and N. Y., Youghiogheny River, Pa., tributaries not now
under improvement, and the upper Ohio for 109 miles below its head
at Pittsburgh, Pa.
  District engineer: Lt. Col. William E. R. Covell, Corps of
Engineers.
  Division engineer: Col. R. G. Powell, Corps of Engineers.
                                    IMPROVEMENTS

                                      Page                                    Page
1. Monongahela River, Pa. and              7. Tygart River Dam, W. Va__       1086
     W. Va------------------         1072  8. Examinations, surveys, and
2. Beaver and Mahoning Rivers,                  contingencies (general)_      1090
     Pa. and Ohio --- --             1076  9. Other projects for which no
3. Allegheny River, Pa., con-                   estimates are submitted __    1091
     struction of locks and dams-    1077 10. Plant allotment------------     1092
4. Ohio River above mile 109,             11. Ohio River Basin flood con-
     construction of locks and                  trol -------
                                                     _       -------------    1092
     dams -------------------        1085 12. Allegheny River, Pa., bank
5. Ohio    River,    open-channel               protection --------------     1092
     work --------------             1085 13. Monongahela      River,  Pa.,
6. Youghiogheny River, Pa---         1085       bank protection ---------     1093

                1. MONONGAHELA RIVER, PA. AND W. VA.

   Location.-This river is formed by the junction of the Tygart and
West Fork Rivers about 1 mile south of Fairmont, W. Va., and flows
in a northerly direction 128 miles to its junction with the Allegheny
River, forming the Ohio River at Pittsburgh, Pa. (See U. S. Geo-
logical Survey charts for Pennsylvania and West Virginia.)
   Previous projects.-Adopted by the River and Harbor Acts of June
10, 1872, June 3, 1896, and June 4, 1897. Under these projects, all
completed, the cost and expenditures were $5,420,540.52 for new work
and $741.66 for maintenance, a total of $5,421,282.18. For further
details see page 1910 of Annual Report for 1915.
   Existing project.-This provides for the improvement of the river
by 14 locks and dams to afford slack-water navigation from Pitts-
burgh, Pa., to 4 miles above Fairmont, W. Va., a distance of 131
miles. Original locks nos. 1 to 7, inclusive, were built by the Mo-
nongahela Navigation Co. and acquired by the United States in 1897,
and locks 8 to 15, inclusive, were built by the United States prior to
1904. Locks 7, 8, and 9 are replaced by new locks 7 and 8. Increased
traffic necessitated an enlargement and improvement of the locks and
dams between Pittsburgh and Rices Landing, Pa. In rebuilding the
locks and dams from nos. 1 to 6 the adopted standard was two parallel
chambers each 56 by 360 feet, with 8 feet depth on sills and fixed con-
crete dams. New locks nos. 7 and 8 are single chambers 56 by 360
feet.
         RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                     1073
   The project includes the building of locks 10 to 15, inclusive, single
locks, 56 by 182 feet, with 7 feet depth on sills and fixed concrete
dams, which are still adequate for the present traffic. The channel
width varies from 125 feet in pool no. 15 to 500 feet in pool no. 1.
   The existing project was authorized by river and harbor acts as
follows:
  Enlargement and improvement of lock and dam no. 6, additional
works at lock no. 3, and for new repair steamer and new dredge
boat with equipment, by the act of March 3, 1899, at an estimated
cost of $185,556 (see Annual Report of the Chief of Engineers for
1897, pp. 2423-2424); acquisition of land and additional improve-
ments at nos. 5 and 6, authorized by the act of March 3, 1905, at a
cost of $7,850 (see Annual Report for 1904, p. 460).
  Rebuilding of lock and dam no. 2, by the act of June 13, 1902, "in
accordance with the report submitted by the engineer in charge,
dated February 4, 1902" (not printed), at an estimated cost of
$655,961; estimate increased in 1910 to $698,961. (See Annual Report
for 1909, p. 1756.)
  Rebuilding of lock and dam no. 3, by the act of March 3, 1905, at
an estimated cost of $589,196 (H. Doc. No. 209, 58th Cong., 2d sess.).
  Reconstruction of lock and dam no. 5, by the act of March 2,
1907, at an estimated cost of $756,042 (H. Doc. No. 209, 58th Cong.,
2d sess.).
  Reconstruction of lock and dam no. 6, by the act of March 4,
1913, at an estimated cost of $356,400 (H. Doc. No. 1217, 62d Cong.,
3d sess.) ; estimate increased in 1916 to $418,860.
  Additional improvements by the act of September 22, 1922 (H.
Doc. No. 288, 67th Cong., 2d sess.), at estimated costs as follows:
Guide walls and guard walls, nos. 1 to 6----------------            $1, 255, 130
Lengthening land chamber of lock no. 3 to 720 feet ----------------     787, 722
New chamber (360 feet long), lock no. 4 ---------------------------     699, 786
Lock and dam no. 7 ---------------------------------------           1, 161, 241
Lock and dam no. 8--------------------------------------             1,165, 758
Lock and dam no. 7 (second chamber) ------------------------ --         419, 126
Lock and dam no. 8 (second chamber) ----------------------------        504, 465
Reconstruction of dam no. 4--------------------------------------       397, 211
Marine ways, repair plant, office, and warehouse ----------------       250, 000

      Total -----------------------------------------                 6, 640, 439
   The act of July 3, 1930, modified the existing project so as to
provide for the construction of new locks and dam about 21/2 miles
below the existing structure, at an estimated cost of $2,175,000, in
lieu of the work authorized at old lock and dam no. 4 (Rivers
and Harbors Committee Doc. No. 22, 70th Cong., 2d sess.). A con-
gressional amendment approved January 31, 1931, provided "that
the Chief of Engineers may, in his discretion, locate the new locks
and dam above the existing structure and on such site as he may
deem most desirable" (Publheic Res. 117, 71st Cong., 3d sess.).
   Operation and care of locks and dams were included in the project
July 1, 1935, under the provisions of the Permanent Appropriations
Repeal Act approved June 26, 1934.
   The total estimated cost of new work, revised in 1935, is $11,500,-
000, exclusive of. amounts expended on previous projects. The esti-
mate of annual cost of operation and care of locks and dams, made
in 1936, is $667,500.
1074               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                           Locks and danms, Monongahela River, Pa. and W. Va.
                                                                                 1             I
                                                       I




                                                                                                   Depths on miter           Character of founda-
                        Location                            Dimensions                              sills at normal                 tion
                                                                                                       pool level
                                                       i
                                                                                   Lift at
                                                                                   normal
                                                                                                       ----   ~---I
No.                                                                   Avail-         pool
                                                           Width        able
        Miles                                                of                     level
       above               Nearest town                    cham-      length                       Lower       Upper          Lock            Dam
       mouth                                                          for full
                                                            ber       width


                                                            Feet        Feet          Feet          Feet         Feet
  1         1.9     Pittsburgh, Pa---.....                   1 56         360           7.4          10.0         12. 0    Rock ..--       Rock and
                                                                                                                                            gravel.
  2       11.2      Braddock, Pa-......                      1 56         362           8.3          11.6         12. 1    Gravel ..-      Gravel.
                                                                          360                                              Rock ....
  3       23.8      Elizabeth, Pa _....-                     156          720           8.2          11.9         12. 1                     Do.
                                                                          360
  4       41.5      Charleroi, Pa-........                   1 56
                                                                          720     }    10.6          10. 9        14. 1 Gravel -.        Do.
  5       56.5      Brownsville, Pa -...                     1 56         360          12.4          11. 6        12. 0 Rock. ._-_       Do.
  6       68. 3     Rices Landing, Pa ----                   1 56         360          13. 1         10. 7        11.8 ___do.....       Rock and
                                                                                                                                         gravel.
  7       84. 8     Greensboro, Pa .......                     56         360          15.0          10. 5        11.0     Rock and     Rock and
                                                                                                                             fire clay.  fire clay.
8        90. 6     Point Marion, Pa -.-                       56         360          15.0          10. 5        11.0    __do .--.      Do.
10       101.5      Morgantown, W. Va__                        56         182          10. 2          7.4          8.0    __do ...... Do.
11       104. 1     Uffington, W. Va -.---                     56         182          10.7           6.9          8.0    ___do..-__     Do.
12       109.1      Little Falls, W. Va --                     56         182          10. 7          7.0          8.0    ___do....-     Do.
13       111.6       .. do                                     56         182          10. 7          7.0          8.0    ___do .....    Do.
14       115. 0     Lowsville, W. Va ---                       56         182          10. 7          7.0          8.0    __do .....     Do.
15       124. 2     Hoult, W. Va .---..                        56         182          10. 7          7.0          8.0    ___do ....     Do.


                                                 Type of construction                                   Percent-
           Kind of                                                                                       age of             Year        Estimated or
No.         danm                                                                                        comple-            penedto       actual cost
                                        Lock                                 Dam                          tion           navigation


  1 Fixed -.---- Concrete ....----------                          Timber and concrete --...                    100           1915          $971, 244. 27
  2    . do          --            do------------                 Concrete-------.....---------...             100           1905            905, 098. 44
  3 -     do-            -         do- ------------                     do-------------._                       98           1907         1, 681,538.00
  4 ... do---              ..---- do ---------                  -      do..---------...--------..               99           1932       3 2, 240, 024. 00
  5 .... do....---------do                      ....-------------- do                                           00           1909
                                                                                                               1-----------------         1, 074, 812. 00
  6 .... do ....-----.. do                                        Timber and concrete ..                        99           1897            769, 507. 04
2 7 ......do..------....---.. do ----------- Concrete ----------------                                          99           1925       3 2, 639, 804.00
28    ... do------......       --- do                                  do ------------------
                                                       .....---------------                                     992          1925       3 2, 083, 514. 22
10 .     do...---------do---------------do-----------------                                                   100           1903            210, 444. 64
11 .     do------......---.do---------------do ------------------                                             100           1903            227, 668. 41
12    ...do.....- --. do_----------..                                  do --             .-.---
                                                                                        -100                                 1903            200, 550. 35
13     .do......              .. do- .........                         do_ -        --        ---             100           1904            190, 690. 51
14 ....-do-------.....       ... do----------                  ----- do ..-----..------------......           100           1903            210,126. 87
15 ..... do....... .... do.-------                          ....       do_ .100                                             1903            175, 828.52


12 chambers.                                               s Practically completed.                                        3 Estimated.

Marine ways, etc----_--_-                _           --           $250, 000. 00
Abandoned lock and dam no. 4 ........-                              780, 816.00
Abandoned lock and dam no. 8--------------------------------        245, 900. 00
Abandoned lock and dam no. 9-----------------------------           191, 000. 00
Partial cost of worn-out and abandoned locks and dams nos. 1
  to 7, inclusive, and franchise-------------------------------- 2, 744, 501. 17
   Terminal facilities.-Boat landings are maintained by municipali-
ties along the river.
   A large number of tipples at mines and hoists of various types at
manufacturing plants are maintained for private use in loading and
unloading coal, coke, billets, steel, sand, gravel, oil, acid, etc., but
these are not available for the purpose of general commerce. Exist-
ing private terminals are adequate for shipments and receipt in the
Pittsburgh district of the type of commerce now in existence. The
Glassport terminal of the American Barge Line Co. affords facilities
for limited commerce beyond the capacity of the packet boats not
handled through private terminals. The provision of river-to-rail
          RIVERS AND HARBORS--PITTSBURGH,                    PA., DISTRICT            1075
and rail-to-river transfer terminals on an extensive scale is not im-
portant, since 98 percent of traffic using the river passes through
private terminals, which are more than adequate for the prospective
commerce.
   Operations and results during fiscal year-New York.-None.
   Operating and care.-All structures were operated and maintained
in a serviceable condition throughout the year. The U. S. dredge
Beaver dredged an area of 189,030 square feet to an average depth
of 12 feet, removing 34,684 cubic yards of material in pool no. 4.
The total costs during the fiscal year were $435,116.36, of which
 - $62.73 was for new work and $435,179.09 was for maintenance.
The total expenditures during the fiscal year were $481,398.92, of
which - $62.73 was for new work and $481,461.65 was for mainte-
nance.
   Condition at end of fiscal year.-The existing project is about 99
percent complete, the work remaining to complete being the removal
of old lock and dam no. 1. The 14 locks and dams are in serviceable
condition. The head of navigation is at a point 4 miles above Fair-
mont, W. Va. For the controlling depth and conditions at locks and
dams, see tables under "Existing project." The total costs of the
existing project to the end of the fiscal year were $10,605,174.66, of
which $10,363,780.93 was for new work and $241,393.73 was for main-
tenance. The total expenditures were $10,572,309.32, of which $10,-
363,780.93 was for new work and $208,528,39 was for maintenance.
In addition, the sum of $20,446,587.32 was expended between July
7, 1897, and June 30, 1937, on the operation anrid care of the work of
improvement under the provision of the permanent indefinite appro-
priation for such purposes.
   Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year, together with an allotment of
$457,950, received during July 1937, will be applied as follows:
Accounts payable_ _-----------------------------             --------           $33, 242. 54
Maintenance (operating and care) :
    Operation of locks and dams ------------------                  $330, 000
    Ordinary maintenance and repairs------------------               30, 000
    Improvement and reconstruction---------------                    84, 000
    Channel work__----------------------- ---------------            20, 000
    Emergencies ---------------------------------------               4, 240

      Total for maintenance-----------------------------------                  468, 240. 00
Balance remaining ----------------------------------------------                       8. 92
       Total for all work___-------------------------------------- ___          501, 491. 46

  The additional sum of $45,000 can be profitably expended for new
work during the fiscal year 1939 in the removal of old lock and dam
no. 1.
  The additional sum of $685,000 can be profitably expended in the
operation and maintenance of locks and dams during the fiscal year
1939. as follows:
Maintenance (operating and care) :
    Operation of locks and dams                                 --- _------------------------
                                                                          $300,000
    Ordinary maintenance and repairs-____                                    35, 000
    Improvement and reconstruction_ ------------------------------         275, 000
    Channel work --------------------                           _65,             000
   Emergencies _---------------                       -----      _-      -10, 000
      Total for maintenance------                       -_-----__         _-_685,       000
1076           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                  Cost and financial summary

Cost of new work to June 30, 1937---------------------------- $15, 784, 321. 45
Cost of maintenance to June 30, 1937---------------------- 120, 688, 720. 68
      Total cost of permanent work to June 30, 1937------                                                          36, 473, 042. 13
Plus accounts receivable June 30, 1937------------------------                                                              377. 20

     Gross total costs to June 30, 1937---------------------                                                       36, 473, 419. 33
Minus accounts payable June 30, 1937                                                                                    33, 242. 54

     Net total expenditures--------------------------------36,                                                          440, 176. 79
Unexpended balance June 30, 1937----------------------------                                                             43, 164. 26

           Total amount appropriated to June 30, 1937- -----------                                                 36, 483, 341. 05

   Fiscal year ending June 30                         1933           1934              1935                 1936             1937


Cost of new work......_ _ _ __....                 $288, 713. 15   $51, 176. 09     $90, 778. 99       $1, 137. 84           -$62. 73
Cost of maintenance-....-_...._ .                   571, 697. 79   485, 942. 96     520, 455. 20    -155, 697. 92          435, 179. 09

                    -----------
       Total cost-.........---
                           ....                     860, 410. 94   537, 119. 05     611, 234. 19    -154,     560. 08      435, 116. 36

Total expended    --      __---------               695, 747. 48   458, 075. 88     631, 644. 37    -179, 844. 74          481, 398. 92

Allotted          ----.........................    641,140. 83     409, 148. 99   1, 109, 304. 34   -272, 746. 91         -142, 274. 89


Balance unexpended July 1, 1936                   -----               $666, 838.07
Amount allotted from War Department Appropriation Act, ap-
  proved May 15, 1936_,--------- --------------------------------       13, 000. 00
      Amount to be accounted for                                             838. 07
                                                                       6-------------------------------
Deductions on account of revocations of allotments-----------          155, 274. 89
      Net amount to be accounted for                     ---           524, 563. 18
Gross amount expended___                                $570, 117. 68
Less reimbursements collected------------------------88, 718. 76
                                                                                                                   -    481,398. 92
Balance unexpended June 30, 1937------------------------------                                                          43, 164.     6
Outstanding liabilities June 30, 1937----------------------------                                                       38, 409.    70
Balance available June 30, 1937---------------------------------                                                         4, 754.    56
Accounts receivable June 30, 1937---------------------------------                                                          377.    20
Unobligated balance available June 30, 1937                                               -------                         5, 131. 76
Amount allotted by War Department Civil Appropriation Act of
July 19, 1937----------------                       --------------------------                                         457, 950. 00
Balance available for fiscal year 1938------------------------                                                          463, 081. 76
Amount (estimated) required to be appropriated for completion of
existing project 2- _ - - - - - - - - - - - - - -- - - -_- - - - - - --                                                 45, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939 :
                        - - - - - - - - - - - -- - - - - -- - - -- - - - - - - - - - - - - - - - - - - - - -
    For new work 2                                                                                                       45, 000. 00
    For maintenance 2                                                                                                         000.00
                                                                                                                        6------85,
                    - ---
    Total ¢_-_______                                __                                                                  730, 000. 00
  1 Includes $20,446,587.32 for operating and care from permanent indefinite appropriation.
  2 Exclusive of available funds.

               2. BEAVER AND MAHONING RIVERS, PA. AND OHIO

   Location.--The Mahoning River rises in northestern Ohio and
flows generally southeasterly to a point near New Castle, Pa., where
it unites with the Shenango River to form the Beaver River. The
Beaver River flows in a southerly direction for 21 miles and empties
into the Ohio River at a point about 25 miles below Pittsburgh, Pa.
         RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                   1077
   Existing project.-This provides for a channel 12 feet deep from
the mouth of the Beaver River to Struthers, Ohio, with a width of
250 feet in the Beaver River and 200 feet in the Mahoning River,
increased to 300 feet at bends.
   The estimated cost to the United States is $37,000,000, for new
work and $630,000 for annual maintenance and operation.
   This channel is to be obtained by the construction of dams with
twin locks 56 by 360 feet, by dredging, and by the construction of
one water supply reservoir only, with such modifications as in the
discretion of the Chief of Engineers may be advisable. The project
width and depth is as provided in House Document No. 277, Seventy-
third Congress, second session, as a Federal project and to continue
to Lake Erie at or near Ashtabula, Ohio, subject to the final ap-
proval of the whole project from the Ohio River to Lake Erie by
the Board of Engineers for Rivers and Harbors.
   The existing project was authorized by the River and Harbor Act
approved August 30, 1935, (H. Doc. No. 277, 73d Cong., 2d sess.),
which document contains the latest published maps.
   Local cooperation.- The project is subject to the condition that
local interests shall furnish, free of cost to the United States, all
necessary rights-of-way and flowage rights except the lands and
flowage necessary for the reservoir; shall furnish suitable areas for
the disposal of dredged material during initial construction and
future maintenance as and when needed; shall guarantee the United
States against all claims for damages incident to the improvement,
including claims for water rights; and shall construct, maintain, and
operate all highway bridges and road changes needed for the im-
provement, free of cost to the United States; and provided further
that before improvement is undertaken local authorities shall agree
to operate the Milton Reservoir under the supervision of the Chief
of Engineers for the primary purpose of increasing the low-water
flow in the interest of navigation; and local interests shall furnish
assurances satisfactory to the Secretary of War that they will pro-
vide at their own expense suitable and adequate terminals and dredge
the harbor areas adjacent thereto in accordance with plans approved
by the Chief of Engineers. The signing of agreements by local au-
thorities to operate the Milton Reservoir under supervision of the
Chief of Engineers, and their acceptance by the Chief of Engineers,
has been the only work of a cooperative nature undertaken.
   Terminal facilities.-None at the present time.
   Operations and results during fi cal year.-None.
   Condition at end of fiscal year.-Same as described in the project
document. No work has been done on the existing project.
   Proposed operations.-No operations are contemplated during the
fiscal year 1938.
                         Cost and financial summary
Total amount appropriated to June 30, 1937---------------
Amount (estimated) required to be appropriated for completion of
  existing project------- ---------     --------------------     $37, 000, 000
  3. ALLEGHENY RIVER, PA.-CONSTRUCTION OF LOCKS AND DAMS

  Location.-Rises in northern Pennsylvania, flows northwestward
into New York, thence southward to Pittsburgh, Pa., where it joins
with the Monongahela River to form the Ohio. Its length is 325
1078           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

miles. (See U. S. Geological Survey Charts of Pennsylvania and
New York, unnumbered.)
  Existing project.-This project provides for nine locks and dams
establishing a least slack-water depth of 9 feet in the lower 72 miles
of the river. After dredging a 9-foot channel with a 200-foot width
below lock no. 2, lock and dam no. 1 are to be eliminated.
  The estimate of cost for new work revised in 1935, is $17,700,000.
No estimate for maintenance was made. The estimate of annual cost
for operation and care of the locks and dams, made in 1936, is
$209,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for lock and dam
no. 1 (Annual Report for 1886, p. 1545, which contemplated a fixed
dam); on September 29, 1891, the Secretary of War authorized the
change to a movable dam (Annual Report for 1891, p. 2366) ; the
act of June 3,1896, provided for locks and dams nos. 2 and 3 (An-
nual Report for 1896, p. 2214); act of July 25, 1912, provided for
locks and dams nos. 4 to 8, inclusive (H. Doc. No. 540, 62d Cong., 2d
sess.).
   The act of July 3, 1930, modified the existing project so as to pro-
vide for a depth of 9 feet in the lower 61 miles.
   The act of August 30, 1935, provided for the replacement of lock
and dam no. 1 by a dredged channel, 9 feet deep and 200 feet wide
up to lock no. 2, and for the construction of new locks and dams
nos. 2 and 3 to replace existing locks and dams nos. 2 and 3 (Rivers
and Harbors Committee Doc. No. 16, 72d Cong., 1st sess.); this act
also provided for the construction of lock and dam no. 9, the raising
of the crest of dam no. 8, and the dredging of a navigable channel at
the head of pool no. 8 (H. Doc. No. 721, 71st Cong., 3d sess., aind
Rivers and Harbors Committee Doc. No. 27, 73d Cong., 2d sess.).
   Prior to adoption of the modified project by the River and Harbor
Act of 1935, this work had been authorized May 28, 1935, by the
Emergency Relief Appropriation Act of April 8, 1935.
   Operation and care of the locks and dams were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
                   Locks and dams nos. 1 to 9, inclusive, Allcghcny Rircr

                                                                           Depth on miter
                   Location                    Dimensions                  sills at normal Character of foundation
                                                                             pool level
                                                                 Lift at
                                                                 normal
                                          Width       Avail-      pool
     Miles                                              able      level
     above            Nearest town         hm         length               Lower     Upper     Lock         Dam
     mouthcha-                                        for full
                                               her    width

                                               Feet    Feet       Feet      Feet      Feet
1      1. 7     Pittsburgh, Pa .......          55      286        7. 0     8. 0      15. 0  Gravel____ Gravel.
2      6. 7     Aspinwall, Pa ___....           56      360       18. 0    12. 25     11. 0  Rock -___   Rock.
3     14. 7     Cheswick, Pa .........          56      360       12. 0    10. 8      10. 5 ___do ...... Gravel.
4     24. 0     Natrona, Pa-----------          56      360       13. 5     9. 5       9.0 ___do-__      Rock.
5     30. 5     Freeport, Pa ...-----------     56      360       12. 0    11. 0      11. 0  Gravel .... Gravel.
6     37. 0     Glen Irwin, Pa---...------      56      360       12. 0    11. 0      11. 0  Rock- .. . Do.
7     46. 0 Kittanning, Pa ....... 56                    360      13. 0    10. 0     11. 0 Gravel .- Do.
8     53. 3 Templeton, Pa ....     56                    360      15. 0    10. 5     11. 0 Rock . Rock.
19     62. 2 Rimmerton, Pa-........ 56                    360      22. 0    10. 75    11. 5 ._do...-- Do.

1 Under construction.
                RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                                                                                       1079
                       Locks and dams nos. 1 to 9, inclusive, Allegheny River

                                                   Type of construction                                       Percent- Year
No.     Kind of dam                                                                                            age of opened Estimated or
                                                                                                              comple- to nav- actual cost
                                          Lock                                    Dam                           tion   igation

  1    Movable- ....           Concrete ........--------------..Chanoine wicket ......------                     100         1903          2   $591, 187. 42
  2 Fixed -----------             do --------------                Concrete----------------                      99         1934           1, 640, 000. 00
13 ... do---...           ---... do                          --..... do---                   .....------------- 99          1934           1, 720, 000. 00
  4 ....    do                  .do                                  _-.do .         .          .....           100         1927           1, 691, 985. 21
  5      .. do..-----------....do        __-----------------..          do .------------------- 991/                        1927           1, 857, 618. 45
  6    .. do--...        ----- do-----------------do                                   ..------------------      99         1928           1, 699, 876. 57
  7 -- _ do-----------....do                        ...---------------- do------------------                     99         1930           1, 488, 957. 53
  8   ... do .--            __...do                                     do------------------
                                                                    .-----------------                           99         1931           3, 269, 442. 82
1 9 __...do---------do...... ... do----------------.....do---------------                                        60            ..-------   3,172, 000. 00

               Total      ..                       ------------
                                   --------------------                              -----------------                     -----      317, 131,068.00


  1 Under construction.
  2Actual cost.
  3 Exclusive of $1,740,932.21 as follows:
       Abandoned lock and dam no. 2                            ....................--------------------------------------------                $544,928.85
       Abandoned lock and dam no. 3--                               -----------------------------------------                                   310, 103. 36

       Additional items entering into cost of project:
          Demolishing old dams nos. 2 and 3 and dredging, Public Works Act-------------                                                         240, 000. 00
          Extension of guide wall, lock no. 5__----------------------------------------                                                          50, 000. 00
          Construction of lockkeepers' dwellings, locks nos. 3 and 7----------------------                                                       60,000.00
          Dredging channel          ----------------------------------------------------                                                        535, 900.00
                Total------------                   -     --     ------------------------------------------                                     885, 900. 00

                Grand totaL...........---------------------------------------------------.......                                       18, 872, 000. 21


   Local cooperation.-Fully complied with.
   Terminal facilities.-Tipples and numerous hoists are privately
maintained for use in loading and unloading coal, coke, sand, gravel,
and manufactured articles. The transshipment of freight between
river and railroads is handled at privately owned river-to-rail sand
and gravel hoists.
   Operations and results during fiscal year-Regular funds.--At new
lock no. 2, the lock chamber was unwatered and the temporary guard
and miter sills were raised by hired labor. At lock no. 4, 33,826
square feet of steel sheet piling, 155,535 cubic yards of fill, 6,373 cubic
yards of derrick stone, 1,550 cubic yards of riprap and 206 cubic
yards of concrete were placed by contract to complete the restoration
of the dike and abutment, necessitated by flood conditions. At new
lock no. 9, the installation of piping, wiring, lock and powerhouse
machinery, and hydroelectric plant is being prosecuted by hired
labor.
   Operating and care.-The operation and maintenance in serviceable
condition of locks nos. 1 to 8, inclusive, and channel dredging con-
stitute the principal activities. The hired dredge Central and the
U. S. dredge Beaver dredged an area of 273,965 square feet to an
average depth of 9 feet, removing 86,989 cubic yards of material in
pool no. 7 at the lower approach to lock no. 8. At lock no. 8, 3,708
cubic yards of fill were placed below the abutment for bank protec-
tion. The total costs during the fiscal year were $513,499.79, of which
$74,665.91 was for new work and $438,833.88 was for maintenance.
The total expenditures during the fiscal year were $583,335.48, of
which $74,665.91 was for new work and $508,669.57 was for mainte-
nance.
1080      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Emergency Relief funds.-At lock no. 9, 47,700 cubic yards of com-
mon excavation, 8,382 cubic yards of rock excavation, 1,100 square
feet of rock channeling and 6,980 cubic yards of fill were removed.
Forty-three thousand three hundred and ninety-one cubic yards of
concrete were placed to complete the land wall, river wall, and lower
guard wall. Four thousand eight hundred and thirty-two cubic yards
of concrete were placed for 26 lifts of the abutment. Twenty-one
thousand and ninety-nine cubic yards of concrete were placed for 23
lifts of the dam.
   The total cost for the fiscal year, all for new work, was $971,071.62,
and the total expenditures were $1,074,463.20.
   Public Works funds.-Operations consisted of clearing of Fourteen
Mile: Island of trees, debris, and snags by hired labor. The total cost
for the fiscal year, all for new work, was $89.77. The total expendi-
tures were $100.88.
   The total cost, all funds, was $1,484,661.18, of which $1,045,827.30
was for new work and $438,833.88 was for operating and care (main-
tenance). The total expenditures were $1,657,899.56, of which $1,149,-
229.99 was for new work and $508,669.57 was for operating and care.
   Condition at end of fiscal year.--The project is about 97 percent
complete. Locks and dams Nos. 1 to 8, inclusive, are in operation,
giving slack-water navigation from the mouth to Rimerton, Pa., a
distance of 61 miles. Completion of lock no. 9, now under construc-
tion, will extend slack water to East Brady, Pa., 71 miles above the
mouth. The work remaining to be done to complete the project is
the extension to guide wall of lock no. 5, additional bank protection
and the erection of two lock keepers' houses for locks nos. 3 and 7.
   The total costs have been as follows:
Regular funds:
   New work--------------------------------------------13, 301, 838.45
   Maintenance________-------------------                    238, 815. 07
   Operating and care----------------------------------   4, 531, 766. 20
      Total-------                                               8, 072. 419. 72
                                                                1------------------------------------
Public Works funds, new work-------------------------------      1, 183, 281. 32
Emergency Relief funds, new work-- --------------------------    1, 742, 257. 72

       Total costs, all funds-------------------------------    20, 997. 958. 76
   The total expenditures were $17,368,294.24 of which $1,183,281.32
was from Public Works funds, $1,646,984.05 from Emergency Relief
funds and $14,538,028.87 from regular funds. In addition the sum
of $3,528,158.88 was expended between January 1, 1903, and June
30, 1935, on the operation and care of the works of improvement
under the provisions of the permanent indefinite appropriation for
~uch purposes.
  Proposed operations-Regular fun ds.-The balance unexpended,
including accounts receivable at the end of the year, together with
an allotment of $360,000 received during July 1937, will be applied
as follows:
         RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                         1081
Accounts payable--------------------------------------------- $20, 471.96
New work:
    Construction of lock no. 9, and alterations to lock
      no. 8, by contract (July 1 to Oct. 31, 1937-      $202, 000. 00
    Complete purchase and installation of lock-oper-
      ating.machinery at lock no. 9, by hired labor
      (July 1 to Dec. 31, 1937) ----------------------    55, 000. 00
    Purchase of land at lock no. 9----------------        15, 000. 00

      Total for new work--------------   -----------------  ------ 272, 000. 00
Maintenance (operating and care) :
    Operation of locks and dams-------------------     $160, 050. 00
   Ordinary maintenance and repairs ------------------    5, 250. 00
   Channel work ---------------------------------         2, 700. 00
    Emergencies -------------------------------------     3,000. 00

      Total for maintenance----------------- ------------------        171,000.00
Balance remaining----   ---------------------                                1.96

      Total for all work-______      _____-------------__-_             463, 473.92
  Public Works funds: The obligated balance of funds allotted by
the Public Works Administration, amounting to $66,768.06, will be
applied to the purchase of land at new dam no. 3.
  Emergency Relief Administration funds: The obligated balance
of funds allotted from the Emergency Relief Appropriation Act of
1935, including accounts receivable, will be applied as follows:
Accounts payable____________------------------                       $95, 349. 43
New work: Construction of lock and dam no. 9 and alterations to
  dam no. 8, by contract (July 1 to Oct. 31, 1937) -----------------  11, 984. 57

      Total for all work_       __-_____---____-                       807, 334. 00
  The additional sum of $949,000 can be profitably expended during
the fiscal year 1939, to be applied as follows:
New work:
   Dredging pool no. 9, by contract (July 1, 1938, to
     June 30, 1939) -----------------------------------         $500, 000
   Flowage easements, pools nos. 8 and 9 (July 1, 1938, to
     June 30, 1939) ------------------------------        ------ 40, 000
   Grade and pave esplanade at lock no. 9, by hired labor
      (July 1 to Dec. 31, 1938) ----------------------------      45, 000
   Grade roadway and place riprap at lock no. 9, by hired
     labor (July 1 to Dec. 31, 1938) -----------------            20, 000
   Raise esplanade at lock no. 8 by contract (July 1, to Nov.
     30, 1938) --------------------------------------             20, 000
   Construction of lockmasters' dwellings at lock no. 9,
     under contract (July 1 to Nov. 30, 1938)------------         25,000
   Removal of dam no. 1, under contract (May 1 to 30,
     1939) ----       ----------------------------      -----     25,000

        Total for new work--------------------------     ----------- $675,000
Maintenance (operating and care) :
    Operation of locks and dams--___-------------           $135, 000
    Ordinary maintenance and repairs_____------------          10, 000
    Improvement and reconstruction     _______----------       45,000
    Channel work ---------------------------------------- 82, 000
    Emergencies----------------------- --------------           2, 000
      Total for maintenance_------------------------------------            $274,000

      Total for all work --------------            ----------------
                                                   _-                       949, 000
1082           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                           Cost and financial summary

                                 MAINTENANCE             AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937 -- ___-__ ______________                                                 $13, 301, 838. 45
Cost of maintenance to June 30, 1937_______________________                                                 14, 770, 581. 27
      Total cost of permanent work to June 30, 1937_________--                                               18, 072, 419. 72
Undistributed costs June 30, 1937--------------------------                                                       14, 154. 99
      Net total cost to June 30, 1937_________________________                                               18, 086, 574. 71
Plus accounts receivable June 30, 1937                                                                                 85. 00
      Gross total costs to June 30, 1937_______________________                                             18, 086, 659. 71
Minus accounts payable June 30, 1937_________________________                                                    20, 471. 96
      Net total expenditures ___  ________________________                                                   18, 066, 187. 75
Unexpended balance June 30, 1937_________________________-__                                                     103, 388. 92
         Total amount appropriated to June 30, 1937______________                                            18, 169, 576. 67

  Fiscal year ending                1933                 1934             1935                      1936
         June 30                                                                                                        1937


Cost of new work......           $952, 214. 75       $1, 397, 786. 95   $170, 858. 07             $86, 098. 67         $74, 665.91
Cost of maintenance ...           184, 661. 66           173, 488. 75    265, 734. 82             567, 865. 99         438, 833. 88
       Total cost.......        1, 136, 876. 41       1, 571, 275. 70    436, 592. 89             653, 964. 66          513, 499. 79
Total expended-_ _...           1, 076, 706. 17       1, 565, 241. 49    409, 279. 33             678, 094. 72          583, 335. 48
Allotted........--------------. 2, 995, 494. 66         326, 171. 87     656, 000. 00             864, 000. 00          107, 099. 26


Balance unexpended July 1, 1936_                                                                                 $578, 224.40
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-                               _                                                            108, 500. 00
      Amount to be accounted for____                                                                              686, 721. 40
Gross amount expended__________________________                                   $621, 662. 65
Less reimbursements collected -- _______________                                        38,     327. 17
                                                                                                                  583, 335. 48
      Balance unexpended June 30, 1937_________                                                                   103, 388. 92
Outstanding liabilities June 30, 1937----------------$30, 746. 07
Amount covered by uncompleted contracts----------      50, 823. 47
                                                                                                                   81. 569. .. 54
                                                                                                                   v i ,-      ..


      Balance available June 30, 1937__                                                 ----------------           21, 819. 38
Accounts receivable June 30, 1937__                                                                                         85. 00

     Unobligated balance available June 30, 1937___                                                                21, 904. 38
Amount allotted by War Department Civil Appropriations Act
    of July 19, 1937 --                    -------                                                                360, 000. 00

          Balance available for fiscal year 1938                                                ---               381, 904. 38

Amount (estimated) required to be appropriated for completion
of existing project2_------------ ---                                                                            675, 000.00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2- - - - - - - - - - - - - - - - -                                         --                     675 , 000. 0 0
                       - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - -
   For maintenance 2                                                                                              274, 000. 00
                     --- --- --- --- ----- ---- ---- ---- ---- ---                --      - -      - - -
          Total 2                                                                                                 949, 000. 00
   1 Includes $3,528,158.88 for operation and care from permanent indefinite appropriation.
   2 Exclusive of available funds.
               RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                                                                          1083
                                               PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937 ______    ________-------                                                             $1, 183, 281. 32
Cost of maintenance to June 30, 1937_    --------                                                                   --------------
          Total cost of permanent work to June 30, 1937                                                                   , 183, 281. 32
                                                                                                                         1------------
Net total expenditures---------------------------------     1, 183, 281. 32
Unexpended balance June 30, 1937---------------------------     66, 768. 06

          Total amount appropriated to June 30, 1937----------                                                           1, 250, 049. 38

    Fiscal year ending June 30                1933                    1934                 1935                  1936               1937


Cost of new work_______--               __-- $167, 882.32 $958, 605. 26
                                     .....
                           ___ _.......____--                              $56, 703. 97       $89.77
Cost of maintenance-------                    --         --------       ------------- --------------
Total expended___--__---                -__ -    -
                                       _______-_____                149, 259. 19     921, 808. 69          112, 112. 56                100.88
Allotted---._.------------------_-                   - -_- 1, 033, 000. 00            240,000.00          -22,950.62


Balance unexpended July 1, 1936 ---_____----_______                                                 _______      $66, 868. 94
Gross amount expended----------_    --------                                                               -100.           88
      Balance unexpended June 30, 1937_____ _____       -_______                                                            66, 768. 06
Outstanding liabilities June 30, 1937-------------------------                                                              66, 768. 06

                                          EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937__--____________-______                                                                $1, 742, 257. 72
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937____-----                                                            1, 742, 257. 72
Plus accounts receivable June 30, 1937-- __-___-        -______
                                                              _-                                                           -      75. 76
     Gross total costs to June 30, 1937                                                                                 1____________-_____
                                                                                                                        1, 742, 333. 48
Minus accounts payable June 30, 1937_______________                                                  ___                    95, 349. 43
     Net total expenditures --  _______________--___--      -                                                            1, 646, 984. 05
Unexpended balance June 30, 1937-------       ------------- __                                                              807, 258. 24
          Total amount appropriated to June 30, 1937____________                                                         2, 454, 242. 29

    Fiscal year ending June 30                1933                    1934                 1935                  1936               1937


Cost of new work..__.___________
                              ---               __-----___----------
                                                 ___-___--                         __-__             -    $771, 186. 10           $971, 071. 62
Cost of maintenance-                             ----------------

Total expended_____--____--------_---------             ---------------                      ----          572,520.85            1,074,463.20
Allotted----.....          --------------------             -------------            $2, 800, 000        -345, 757. 71


Balance unexpended July 1, 1936___                                                                         _            $1, 881, 721.44
Gross amount expended--------------------                                            $1, 221, 924. 86
Less reimbursements collected_______----- -                                        _     147, 461. 66
                                                                                                                         1, 074, 463.20
      Balance unexpended June 30, 1937------      ___      -________                                                       807, 258. 24
Outstanding liabilities June 30, 1937------------     $10, 549. 93
Amount covered by uncompleted contracts------         796, 708. 31
                                                                                                                           807, 258. 24
Accounts receivable June 30, 1937                                                                   _.-----_--               -        75. 76
Unobligated balance available June 30, 1937___------------------                                                                      75. 76
1084            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

CONSOLIDATED COST AND FINANCIAL SUMMARY FOR ALLEGHENY RIVER, PA., CONSTRUC-
                                                   TION OF LOCKS AND DAMS

Cost of new work to June 30, 1937_______________________ _ $16, 227, 377. 49
Cost of maintenance to June 30, 1937 __________    ________ 1 4, 770, 581.27
      Total cost of permanent work to June 30, 1937 ________    20, 997, 958.76
Undistributed costs June 30, 1937--   _________-___       -______    14, 154. 99
      Net total cost to June 30, 1937_______________________                                                              21, 012, 113. 75
Plus accounts receivable June 30, 1937 ----    ______-160.76

     Gross total costs to June 30, 1937____________________ __                                                            21, 012, 274. 51
Minus accounts payable June 30, 1937 -___     ___.________-___                                                                115, 821. 39

     Net total expenditures    __________________________                                                                120, 896, 453. 12
Unexpended balance June 30, 1937_______-------------                                                                          977, 415. 22
          Total amount appropriated to June 30, 1937________-__                                                           21,873, 868.34
  Fiscalyear nding                     1933                     1934                   1935                 1936                  1937
       June 30

Cost of new work.....               $952, 214. 75          $1, 565, 669. 27      $1, 129, 463. 33        $913, 988. 74         $1, 045, 827. 30
Cost of maintenance.__               184, 661. 66              173, 488. 75          265, 734. 82         549, 865.99              438, 833.88
       Total cost......            1, 136, 876. 41          1, 739, 158.02         1, 395, 198. 15      1, 463, 854. 73         1, 484, 661. 18
Total expended--------......       1, 076, 706. 17          1, 714, 500. 68        1, 331, 088. 02      1, 362, 728. 13         1, 657, 899. 56
Allotted...............            2, 995, 494. 66          1,359,171.87          3, 696, 000. 00          495, 291.67            107, 099. 26


Balance unexpended July 1, 1936                                    _       ________-_                                     $2, 526, 814. 78
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------------------                                                                 108, 500. 00
      Amount to be accounted for_  ---------------------                     2, 635, 314.78
Gross amount expended---------------------- $1,843, 688. 39
Less reimbursements collected                             85, 788. 83
                                                         1------------------
                                                                             1, 657, 899. 56
      Balance unexpended June 30, 1937--------------------                                                                    977, 415. 22
Outstanding liabilities June 30, 1937-- ----------- $108, 064. 06
Amount covered by uncompleted contracts-......       847, 531. 78
                                                                                                                              9Q55 .595 A84

     Balance available June 30, 1937---------------------                                                                      21, 819. 38
Accounts receivable June 30, 1937---_----------_-------                                                                            160. 76

Unobligated balance available June 30, 1937_ __. ______-___                                                                    21, 980. 14
Amount allotted by War Department Civil Appropriation Act
  of July 19, 1937-----------------------------                                                                               360, 000. 00

     Balance available for fiscal year 1938                                                                                   381, 980. 14
Amount (estimated) required to be appropriated for completion
   of existing project               2__----------------                                                                     675, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2___                                                                                                         675, 000. 00         i




       For     maintenance 2----------------                                                                                  274, 000. 00        1




                      - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -   - -- - - - - -
         Total 2                                                               949, 000. 00
   1 Includes $3,528,158.88 for operation and care from permanent indefinite appropriation.
   2 Exclusive of available funds.
        RIVERS AND HARBORS-PITTSBURGH,          PA., DISTRICT    1085

4. OHIO RIVER ABOVE MILE 109, BETWEEN CAPTINA ISLAND AND
     POWHATAN POINT-CONSTRUCTION OF LOCKS AND DAMS

               5. OHIO RIVER OPEN-CHANNEL WORK

  For reports on these improvements, see page 1051.
                    6. YOUGHIOGHENY RIVER, PA.

   Location.-This river, the principal tributary of the Monongahela,
rises in Preston County, W. Va., near the western boundary of Mary-
land and flows northwestward 123 miles to McKeesport, Pa., where
it empties into the Monongahela River 15.5 miles above its mouth.
See United States Geological Survey charts for Pennsylvania, Mary-
land, and West Virginia.
   Previous projects.-Adopted by River and Harbor Acts approved
June 25, 1910, and January 21, 1927. The total costs and expenditures
prior to the adoption of the existing project in 1930 were $48,894.75,
of which $47,194.75 was for new work and $1,700 for maintenance.
For further details see page 1274, Annual Report for 1929.
   Existing project.-This provides for the canalization of the river
from the mouth to West Newton, Pa., 18 miles, by the construction
of two locks and dams.
   The estimated cost of new work, revised in 1935, is $4,197,000.
There is no approved estimate for annual maintenance.
   The existing project was authorized by the River and Harbor Act
approved July 3, 1930 (Rivers and Harbors Committee Doc. No. 9,
61st Cong., 2d sess.). The project was modified by the Chief of Engi-
neers September 7, 1934, to provide for two locks and dams in lieu
of three locks and dams previously authorized. A map of the river
is printed in House Document No. 82, Fifty-sixth Congress, first ses-
sion. The Chief of'Engineers is authorized to revise the plans and
estimates to meet any changes in conditions.
   Terminal facilities.-Privatelymaintained terminals for unloading
coal, sand, gravel, manufactured products, etc., ample for present
requirements, exist at McKeesport, Pa.
   Operations and results during fiscal year.-The U. S. derrickboat
Monallo dredged an area of 161,000 square feet to an average depth
of 10 feet, removing 13,674 cubic yards of material from the mouth to
Fifteenth Street, McKeesport, Pa.
   The total costs during the fiscal year, all for maintenance, were
$6,252.37.    The total expenditures during the fiscal year were
$6,223.24.
   Condition at end of fiscal year.-No construction work has as yet
been done on the canalization project adopted by the 1930 river and
harbor act. The effect of pool no. 2, Monongahela River, upon the
dredged channel in the lower portion of the Youghiogheny River
permits of commercial movements, at low-water stage, from the
mouth to Fifteenth Street, McKeesport, Pa., by vessels of approxi-
mately 9-foot draft. The total cost of the existing project to the
end of the fiscal year was $25,684.45, all for maintenance. The total
expenditures were $24,360.62.
   Proposed operations.-The balance unexpended, together with an
allotment of $10,000, received during July 1937, will be applied to
1086            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

hired-labor dredging of a 9-foot channel between the mouth and
Fifteenth Street, McKeesport, Pa., during May 1938.
   An additional sum of $10,000 can be profitably expended during
the fiscal year 1939, to be applied to maintenance dredging of the
9-foot channel, mouth to Fifteenth Street, McKeesport, Pa.
   The relative desirability of the improvement in the interests of
commerce and navigation entails the postponement of new work on
the canalization project adopted by the River and Harbor Act of
July 3, 1930.
                                          Cost and financial summary
Cost of new work to June 30, 1937----------------------------- $47, 194. 75
Cost of maintenance to June 30, 1937------------------------------ 27, 384. 45

      Total cost of permanent work to June 30, 1937--------------74, 579. 20
Minus accounts payable June 30, 1937----------------------------1, 323. 83

           Net total expenditures---                                           ------------                                    73, 255. 37
Unexpended balance June 30, 1937--------------------------------                                                                1, 778.63
           Total amount appropriated to June 30, 1937 ----------------                                                         75, 034. 00

          Fiscal year ending June 30                                1933          1934           1935              1936             1937

Cost of new work--.....-------------------------------
Cost of maintenance         .---------------- -                     $892. 31   $2, 806. 49    $1, 946.98         $1, 486. 30       $6, 252. 37

Total expended----------------------                                 892. 31     2, 806. 49    3, 184. 67       -1, 046. 09         6,223. 24

Allotted......-------------.....------------..                  4, 455. 66      2, 968. 83     3, 414. 76         3,000. 00        .......


Balance unexpended July 1, 1P36_-_     --------...                                                                             $8, 001. 87
Gross amount expended---------------------------                                              ----                               , 223. 24
                                                                                                                                6---------

      Balance unexpended June 30, 1937                                                                                           , 778. 63
                                                                                                                                1------------------------
Outstanding liabilities June 30, 1937----------------------------                                                               1, 660. 00

     Balance available June 30, 1937------------ --------------                                                                    118. 63
Amount allotted by War Department Civil Appropriation Act of
July 19, 1937 -----------------------------------------------                                                                 10, 000. 00

Balance available for fiscal year 1938---------------------------                                                              10, 118. 63

Amount (estimated) required to be appropriated for completion
                                                                -
   of existing project                           ------------                                               _          4, 197, 000. 00
Amount that can be profitably expended in fiscal year ending
   June 30, 1939, for maintenance                               -------              -                                         10, 000. 00
   1 Exclusive of available funds.

                                   7. TYGART RIVER DAM, W. VA.
   Location.-The Tygart River has its source in Pocahontas County,
W. Va., and flows northerly for a distance of about 131 miles to its
junction with the West Fork at Fairmont, W. Va., where it forms
the head of the Monongahela River. The dam site for the Tygart
River Reservoir is located on the Tygart River in Taylor and Bar-
bour Counties, 2.25 miles above Grafton, W. Va.
  Existing project.-The construction of a concrete gravity-type dam
was authorized by the Public Works Administration January 11,
1934, and adopted by the River and Harbor Act approved August
30, 1935. This dam, 1,850 feet in length at the crest line and rising
215 feet above the elevation of the river bed, will provide for the
         RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                        1087
storage of 100,000 acre-feet to make up the deficiency of water in
the Monongahela River during low-rainfall periods and for the
additional storage of 227,500 acre-feet for flood prevention in the
Monongahela and Ohio Valleys.
   The estimated cost of new work revised in 1937, is $18,300,000, with
$45,000 for annual maintenance and operation.
    Operations and results during fiscal year-Regular funds.-A
total of 653,281 cubic yards of concrete was placed for monoliths nos.
1 to 34 of the main dam and monoliths nos. 43 to 52 of the auxiliary
dam. The installation of drain piping, air-vent piping, grout piping,
reinforcing steel and other embedded metals is practically complete.
Contract work as a whole is approximately 95 percent complete. The
total costs, all for new work, were $4,168,294.43. The total expendi-
tures during the fiscal year were $4,094,242.37.
   Public Works funds.-Operations performed under these funds
were similar to those under regular funds. The total costs, all for
new work, were $3,260,555.64.          The total expenditures were
$3,869,768.05.
   Emergency Relief funds.-The contract work for the relocation of
12 miles of the Berkeley Run Branch of the Baltimore & Ohio Rail-
road was completed during the fiscal year and accepted by the United
States. The total costs, all for new work, were $591,331.76. The total
-expenditures were $822,808.20.
    Condition at end of fiscal year.-The project is 95 percent com-
pleted. Practically all of the masonry work of the main dam, the
stilling basin dam, and training walls have been completed. The
valves, drain piping, grout piping, and reinforcing steel have been
in step with the progress made in the placement of concrete. Con-
tract work for the relocation of the Berkeley Run Branch of the
Baltimore & Ohio Railroad has been completed and accepted by the
United States. The total cost of the existing project to the end
of the fiscal year was $4,168,294.43 regular funds, $9,939,006.55 Public
Works funds, and $2,000,000 Emergency Relief funds, a total of
:16,107,300.98, all for new work. The total expenditures were $15,-
946,583.54 of which $4,094,242.37 was regular funds, $9,852,341.17
Public Works funds and $2,000,000 Emergency Relief funds.
   Proposed operations-Regular funds.-The balance unexpended,
together with an allotment of $1,500,000 received during July 1937
will be applied as follows:
Accounts payable------------------------        ----------------       $74, 052. 06
New work :
    Complete construction of reservoir dam by con-
     tract J..uly 1 to Dec. 30, 1937) ------------- $850, 000. 00
    Complete relocation of Baltimore & Ohio R. R.
     under contract (July 1 to Aug. 31, 1937)- ..     205, 000. 00
   Purchase of land----------------------------       295, 000. 00
   Clearing of reservoir by hired labor (July 1
     to Nov. 30, 1937)- -----------                    60, 000. 00
   Construction of dam-tenders' dwellings by con-
     tract (July 1 to Nov. 1, 1937) ---------------- 30, 000. 00
   Maintenance relocated portion Baltimore & Ohio
     R. R. (July 1, 1937, to June 30, 1938)---------   60, 000. 00
        Total for new work-___---------                              1, 500, 000. 00

                                      ----
       Total for all work---.----------                ---   __ --     574. 052. 06
     20196--37-pt. 1-69
1088          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Public Works funds.-The balance unexpended of funds allotted
by the Public Works Administration, including accounts receivable
at the end of the year, will be applied as follows:
Accounts payable--------------- ----------------------         - $86, 688. 90
New work: Part construction of reservoir dam by contract (July 1
  to Nov. 1, 1937) ------------------------------------------ 60,993.45
        Total for all work-----------                                                                 ____              _          147, 682. 35
  The additional sum of $672,700 can be profitably expended during
the fiscal year 1939, as follows:
New work: Purchase of land-----   ------------------------- $627, 700
Maintenance: Maintenance of Government reservation at dam------                                                                           45, 000
         Total for all work------------------------------672,                                                                                     700

                                    Cost and financial summary
                             MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937----- -----___-----__                                                           __             $4,168,294. 43
Cost of maintenance to June 30, 1937-_____---------
      Total cost of permanent work to June .30, 1937__----    -                                                                  4, 168, 294. 43
Minus accounts payable June 30, 1937---___----------_________                                                                        74, 052. 06
     Net total expenditures------, -- ---------------------- 4, 094, 242. 37
Unexpended balance June 30, 1937--------------------------      130, 757. 63
         Total amount appropriated to June 30, 1937----------                                                                    4, 225, 000. 00

   Fiscal year ending June 30             1933                   1934                      1935                       1936                 1937


Cost of new work.....------------        -------------------------------------------                                                  4, 168, 294. 43
Cost of maintenance                                  ----------------                                  --------------               ---------.....................................
Total expended----........-------------------------------------------------------4, 094, 242. 37

Allotted-------------------                   --     --------------------                                        $3, 700, 000            525, 000. 00


Balance unexpended July 1, 1936--------------_               --     __      _ $3, 700, 00). 00
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936 ------------------------------------                          525, 000. 00
      Amount to be accounted for-------------                     ----           4, 225, 000. 00
Gross amount expended-------------------                   $4, 108, 624. 38
Less reimbursements collected                                       382. 01
                                                                1---------------
                                                                14,
                                                                                                                                 4, 094, 242.37
      Balance unexpended June 30, 1937----------------------                                                                       130, 757. 63
Outstanding liabilities June 30, 1937 ...      $395, 930. 89
Amount covered by uncompleted contracts   -      474, 723. 74
                                                                                                                                   870, 654. 63
     Balance available June 30, 1937--------------------                                                                         -739, 897. 00
Amount allotted from War Department Civil Appropriation
Act of July 19, 1937-_---                                                                                                         500, 000. 00
                                                                                                                                 1----------------------------------
     Balance available for fiscal year 1938-------------------                                                                      760, 103. 00
Amount (estimated) required to be appropriated for completion
of existing project - -- - - - - - - - - - - - - - --------                                                                       627,
                                                                                                                                   6    700.00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: 1 - - -
   For new work          --- - - - -          - - - - - - - - - - - - -
                                                                                                                                   627, 700. 00
   For maintenance 1----             _-_
                                      -__                       ___                                                                 45, 000. 00
         Total' -----               --                  -         --                   -          -          -              -       672. 700. 00
   1 Exclusive of available funds.
              RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                                                                      1089
                                                      PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937------------------------ $9, 939, 006. 55
Cost of maintenance to June 30, 1937 - ------------------- ----------

      Total of permanent work to June 30, 1937--------------                                                           9, 939, 006. 55
Plus accounts receivable June 30, 1937------------------------                                                                  23. 52

     Gross total costs to June 30, 1937-------------------9, 939, 030. 07
Minus accounts payable June 30, 1937------------------------  86, 688. 90

     Net total expenditures_------ -----------------------                                                             9, 852, 341. 17
Unexpended balance June 30, 1937-------------------------                                                                 147, 658. 83

          Total amount appropriated to June 30, 1937----------                                                     10, 000, 000. 00

  Fiscal year ending                 1933                       1934                 1935                1936                1937
         June 30

Cost of new work ......---------                  _         $106, 835. 79       $1, 065, 057. 34   $5, 506, 557. 78 $3, 260, 555. 64
Cost of maintenance ..........               ..           ...........-
                                                         --------------         --------------     ------------- -------------............
                   .
Total expended---------_               __
                                  - -_-...        _             89, 758. 24         864, 815. 55     5, 027, 999. 33       3, 869, 768. 05
Allotted ..........
            -     __-..            .---       -              3,000, 000. 00      7,000, 000. 00 ..

Balance unexpended July 1, 1936------------------------- $4, 017, 426.88
Gross amount expended--------------------- $4, 124, 61.0. 22
Less reimbursements collected                  254, 842. 17            -----------
                                                             3, 869, 768. 05
      Balance unexpended June 30, 1937----------------       __ --                                                        147, 658. 83
Outstanding liabilities June 30, 1937----__------- $64, 138.27
Amount covered by uncompleted contracts -------     83, 520. 56
                                                                                                                          147, 658. 83
Accounts receivable June 30, 1937--                                       _
                                                                        ___-                                                      3. 52

          Unobligated balance available June 30, 1937-                                                                          23. 52
                                                  EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937           _____                                                                  $2, 040, 000. 00
Cost of maintenance to June 30, 1937_..........

      Total cost of permanent work to June 30, 1937_                                                                   2, 000, 000. 00
Net total expenditures__________________________                                                                       2,000, 000. 00
Total amount appropriated to June 30, 1937_                                                                            2. 000. 000. 00

   Fiscal year ending June 30                         1933               1934               1935            1936              1937

Cost of new work----                  .. -------------- ..              ..-----....-------....
                                                        ------......------                     $1, 408, 668. 24 $591, 331. 76
C ost of maintenance -        -     -.    .--..------.
                                             - - - - --                                              ..-----..
                                                                           -- - - -- - - -.---.------.--...
Total expended--.. -----------                        -----------------_--- --------------             1, 177, 191. 80       822, 808.20
Allotted--------           ----- -------------------------------                        $2, 000,000 ------------------------


Balance unexpended July 1, 1936_                                                                                         $822, 808. 20
Gross amount expended------------------_                                                       $823, 607. 88
Less reimbursements eollected                                                                        799. 68
                                                                                                                          822, 808. 20
1090              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR TYGART RIVER DAM, W. VA.

Cost of new work to June 30, 1937___                                                                         $16, 107, 300, 98
Cost of maintenance to June 30, 1937 .......

      Total cost of permanent work to June 30, 1937---------                                                  16, 107, 300. 98
Plus accounts receivable June 30, 1937-___-____________                                                  -              23. 52
      Gross total costs to June 30, 1937____ __  -      --
                                                    _________   16, 107, 324. 50
Minus accounts payable June 30, 1937______ ______ ___ -     -___    160, 740.96
     Net total expenditures ______-_____-------                                                               15, 946, 583. 54
Unexpended balance June 30, 1937___             ___________________                                               278, 416. 46
            Total amount appropriated to June 30, 1937___                                                        225,.000. 00
                                                                                                              1_____-16,

   Fiscal year ending                   1933              1934               1935                 1936
          June 30                                                                                                       1937


Cost of new work......................_       $106, 835. 79  $1, 065, 057. 34                $6, 915, 226. 02      $8, 020, 181. 83
C ost of m aintenance ... ... ...... ..... ---------------.---.----------................................
'Total expended--.......- --------                      - 89, 758. 24       864, 815. 55      6, 205, 191. 13       8, 786, 818. 62

Allotted__--------.............-----................   3, 000, 000. 00   9, 000, 000. 00      3, 700, 000. 00           525, 000. 00


Balance unexpended July 1, 1936 ____           _____                                                          $8, 540, 235. 08
Amount allotted from War Department Appropriation Act ap
proved May 15, 1936----------       -----------------                                                            525, 000. 00

      Amount to be accounted for     _                                                                          9, 065, 235. 08
Gross amount expended ____________-_____                                            $9, 056, 842.48
Less reimbursements collected ______________-- -                                        270, 023. 86
                                                                                                                8, 786, 818. 62

      Balance unexpended June 30, 1937_______                                                                     278, 416. 46
Outstanding liabilities June 30, 1937 __________ $460,069. 16
Amount covered by uncompleted contracts--------- 558, 244. 30
                                                                                                                1, 018, 313.46

     Balance available June 30, 1937_                                                                           -739,    897. 00
Accounts receivable June 30, 1937_____                                   _______                                          23. 52

Unobligated balance available June 30, 1937-------------------739, 873. 48
Amount allotted from War Department Civil Appropriation Act
of July 19, 1937_-       ----    -   --                      1, 500, 000. 00

Balance available for fiscal year 1938____________                                                                760, 126.52
Amount (estimated) required to be appropriated for completion
                     1
  of existing project -----       -------     ---------                                                           627, 700. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1-                                                                                                627, 700. 00
   For maintenance 1--                                                                                             45, 000. 00

          Total -------------------------                                                                         672, 700.00
    1 Exclusive of available funds.

     8. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                         (GENERAL)

  The cost of work during the year amounted to $130,663.44 and the
expenditures were $118,709.10. The balance unexpended, together
with an allotment of $60,500 received during July 1937, will be ap-
              RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                                                     1091
plied as needed during the fiscal year 1938 to payment of expenses
incurred under this heading. The additional sum of $105,000 can be
profitably expended during the fiscal year 1939.
                                      Cost and financial summary
Cost of new work to June 30, 1937 --------------    -----                                       --        ---------
Cost of maintenance to June 30, 1937------------------------                                             $802, 168.84

     Total cost of permanent work to June 30, 1937------------ 802, 168. 84
Minus accounts payable June 30, 1937__------------------------- 14, 296. 05

     Net total expenditures--______----------__        -____                                              787, 872. 79
Unexpended balance June 30, 1937 --------------------------------                                          14, 296. 05

         Total amount appropriated to June 30, 1937----------                                             802, 168. 84

    Fiscal year ending June 30             1933            1934            1935             1936              1937


Cost of new work ........              .------------------ --------------------------------------
Cost of maintenance ..........           $61, 027. 08 $71, 286. 96 $112, 456. 58 $197, 717. 14 $130, 663. 44
Total expended    -----------------       34, 005. 25     63, 978. 39    102, 820. 31     210, 890. 45       118, 709. 10
Allotted---.....-..--.---.-....         - 57, 789. 64     38, 029. 20    180, 500. 00     234, 500. 00        22, 000. 00


Balance unexpended July 1, 1936-----------------___---------   $111, 005. 15
Amount allotted from War Department Appropriation Act approved
  May 15, 1936------------------------------------------------   22, 000. 00
      Amount to be accounted for____________________________                                             133, 005.15
Gross amount expended ---------------------------- $119, 329. 79
Less reimbursements collected___________-        -____   620. 69
                                                                                                          118, 709. 10
      Balance unexpended June 30, 1937------------------------      14, 296. 05
Outstanding liabilities June 30, 1937---------------- ------------- 29, 273. 72
     Balance available June 30, 1937_______________________ -- 14, 977. 67
Amount allotted from War Department Civil Appropriation Act of
July 19, 1937--------------------------------------------     60, 500. 00
      Balance available for fiscal year 1938----------------------_                                        45, 522.33
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - .           105, 000. 00
1 Exclusive of available funds.

   9. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                        [Commercial statistics for this project are given in pt. 2 of report]

                                                          For last      Cost and expenditures to
                                                          full re-            June 30, 1937                Estimated
                   Name of project                       port,  see                                        amount re-
                                                          annual                                            quired to
                                                          report        New work        Maintenance         complete
                                                           for-

Allegheny River, Pa., open-channel work---------1934                       $197, 000     $133,839.89       Completed.
1092              'REPORT           OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

              10. PLANT ALLOTMENT FOR PITTSBURGH, PA., DISTRICT

                                               Cost and financial summary
Undistributed costs June 30, 1937    ---------------           $1, 125, 990. 67
Plus accounts receivable June 30, 1937------------------------145,      349.12
     Gross total costs to June 30, 1937 _________________-__ 1, 271, 339. 79
Minus accounts payable June 30, 1937___ __________________41, 174. 14
     Net total expenditures ---------------------------------                                                         1, 230, 165. 65
Unexpended balance June 30, 1937_______               _______ -                                                        -______
                                                                                                                      -116,   973. 47
             Total amount appropriated to June 30, 1937--------                                                       1, 113,192. 18

     Fiscal year ending June 30                     1933                  1934              1935              1936                  1937


Total expended.......----------------.-.-.._------$79,                                        395. 26     $902, 385. 53           $248, 384. 86
Allotted.........--               ---..-....         ...... --.   -   --....     --..   -. 90, 771. 55   1, 052, 420. 63          -30, 000.00


Balance unexpended July 1, 1936 --- ____________-_--_--_--                                                             $161, 411. 39
I)eductions on account of revocation of allotment------- -----                                                            30, 000., 00

      Net amount to be accounted for ______________--_----      _                                                           131, 411. 39
Gross amount expended -------------- ______         $1, 627, 907. 71
Less:
    Reimbursements collected----- $1, 364, 148.97
    Receipts from sales-----------     15, 373. 88.
                                                      1, 379, 522.85
                                                                                                                            248, 384. 86
       Balance unexpended June 30, 1937--_________ __     _____---116, 973. 47
Outstanding liabilities June 30, 1937__________________________   113, 375. 65
      Balance available June 30, 1937________,________                                                                -- 230, 349.12
Accounts receivable June 30, 1937___________________________                                                            145, 349. 12

             Unobligated balance available June 30, 1937____------                                              -          -85,     000. 00

                             11. OHIO RIVER BASIN, FLOOD CONTROL

      For report on this improvement see p. 1066.
                      12. ALLEGHENY RIVER, PA.-BANK PROTECTION

    Operations and results during fiscal y ear.-During the fiscal year
the following work was performed by hired labor for the protection
of municipal properties along the Allegheny River, from funds pro-
vided under the Emergency Relief Administration: Mosgrove, Pa.,
7,700 tons of stone protection and 38,730 cubic yards of common fill
were placed for bank protection; at Applewold, Pa., 13,729 tons of
stone and 6,305 cubic yards common fill were placed for bank protec-
tion; at Manorville, Pa., 5,515 tons of stone and 4,605 cubic yards of
common fill were placed for bank protection; at Braeburn, Pa., 7,409
tons of stone and 286 cubic yards of common fill were placed for bank
protection.
    The total costs were $259,718.56 and the total expenditures for the
fiscal year were $259,706.50.
    Condition at end of fiscal year.-The project was completed during
the fiscal year.
              RIVERS AND HARBORS-PITTSBURGH, PA., DISTRICT                                                                    1093
                                              Cost and financial summary
Cost of new work to June 30, 1937________                                     _--------------                          $259, 718. 56
Cost of maintenance to June 30, 1937_                                                                                  --------

      Total cost of permanent work to June 30, 1937------------                                                         259, 718. 56
Minus accounts payable June 30, 1937______------------                                                                        12. 06

     Net total expenditures -___-----------                                                                             259, 706. 50
Unexpended balance June 30, 1937         -----------------                                                                8, 861. 98
          Total amount appropriated to June 30, 1937------------                                                        268, 568. 48

          Fiscal year ending June 30                      1933            1934             1935               1936            1937


Cost of new work-----------                     ---------------------------------------------                              $259,  56
                                                                                                                               718.
Cost ofmaintenance-- ..... ...                   ...               -
Total expended-.....------           .-----           -259,
                                                       ___                    _ _------------------------------                 706. 50
Allotted.............-------------------------------.....------------......------------....------------                     268,568.48


Amount allotted from Emergency Relief Appropriation Act, June
   22, 1936--------------------------                                                                                  $298, 400.00
Deductions on account of revocation of allotment --                                      _____-__-_                      29, 831. 52

      Net amount to be accounted for__--------------                                                                    268, 568. 48
Gross amount expended------------------------ $314,267.09
Less:
    Reimbursements collected_________    $54, 405. 59
    Receipts from sales-____________----      155. 00
                                                      54, 560. 59
                                                                                                                        259, 706. 50
      Balance unexpended June 30, 1937-------------------     8, 861. 98
Outstanding liabilities June 30, 1937_ - _________-------------12. 06
          Balance available June 30, 1937-------------------------                                                         8, 849. 92

                 13. MONONGAHELA RIVER, PA., BANK PROTECTION

   Operations and results during fiscal year.-Duringthe fiscal year
the following work was performed by hired labor, for the protection
of municipal properties along the Monongahela River from funds
provided under the Emergency Relief Administration: At Point
Marion, Pa., 43 tons of stone and 21,356 cubic yards of common fill
were placed for bank protection; at Elizabeth, Pa., 9,921 tons of
stone and 350 cubic yards of fill were placed for bank protection:
at Rices Landing, Pa., 1,400 tons of stone and 350 cubic yards of
common fill were placed for bank protection.
   The total costs and expenditures were $135,555.76.
   Condition at end of fiscal year.-The project was completed during
the fiscal year.
                                              Cost and financial summary
Cost of new work to June 30, 1937 ______-________                                             _____               __ $135, 555. 76
Cost of maintenance to June 30, 1937
          Total cost of permanent                      work to June 30, 1937 _._-.__                                    135, 555. 76
Net total expenditures-----                               ----------------                                              135, 555. 76
Unexpended balance June 30, 1937 -----------                                                                       -     20, 644. 24
          Total amount appropriated to June 30, 1937 _-----------                                                       156, 200. 00
1094            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


          Fiscal year ending June 30                      1933           1934          1935        1936           1937

Cost of new work ..-----------------------                               ------------------------             $135, 555. 76
Cost of maintenance--------     ---------------------------                                               ------------
Total expended....--------.......        ...-------   ----------..........               -----------------.. 135, 555. 76
                                                                                 ..------.---
Allotted....-----------------------------------                                 ----------------------- 156, 200.00


Amount allotted from Emergency Relief Appropriation Act of
  June 22, 1936 ----------------------------------------------            $156,200.00
Gross amount expended---------------------------$137, 579. 38
Less reimbursements collected----------------------            2, 023. 62
                                                                           135, 555. 76

          Balance unexpended June 30, 1937 ------------------------                                         20, 644. 24

Status of reports called for by river and harbor acts and committee resolutions

                                                                 Date trans-
          Locality                  Authorization act             mitted to        Document No.           Recommenda-
                                                                  Congress

Allegheny and Monon-            Flood Control Comrn- .
  gahela Rivers, protec-          mittee resolution,
  tion at Pittsburgh.             Feb. 10, 1937.
Allegheny and Monon-            Flood Control Act, .
  gahela Rivers (survey           May 31, 1924.
  for flood control).
Allegheny River, Pa.,           Flood Control Act, .
  tributaries,    sources         June 20, 1936.
  and headwaters (pre-
  liminary examination
  for flood control).
Cheat River and tribu-          Flood Control Act,           .
  taries, W. Va. (pre-            May 5, 1936.
  liminary examination
  for flood control).
Erie Harbor, Pa., to            River and Harbor Act,
  Ohio River, via                 Sept. 22, 1922.
  French Creek and Al-
  legheny River.
Erie Lake Canal to Ohio         River and Harbor Act,        ...
  River, via Miami and            Mar. 2, 1919.
  Erie Canal, Ohio, or
  other routes, includ-
  ing branch canal con-
  necting Lake Midhi-
  gan.
Kiskimiitas and Cone-           River and Harbor Act,
  maugh Rivers, Pa.               Jan. 21, 1927.
Monongahela River,              River and Harbor Act,            Dec. 17,1936 --------------.-        -Unfavorable.
  Pa., erosion.                   Aug. 30, 1935.
          RIVERS AND HARBORS-ZANESVILLE, OHIO, DISTRICT                  1095
     IMPROVEMENT OF RIVERS AND HARBORS IN THE
             ZANESVILLE, OHIO, DISTRICT
   The district embraces all of the Muskingum River watershed, in-
cluding operation and care of the locks and dams on the Muskingum
River.
   District engineer: Lt. Col. J. D. Arthur, Jr., Corps of Engineers.
   Division engineer: Col. R. G. Powell, Corps of Engineers.
                                 IMPROVEMENTS
                                                                          Page
1.   Muskingum River, Ohio_____________ ________________ _______          1095
2.   Muskingum River Valley reservoirs, Ohio _ _                          1098
3.                                                  ------------------
     Examinations, surveys, and contingencies (general)                   1109
4.   Plant allotment-------------------------------------------------1110

                        1. MUSKINGUM RIVER, OHIO

   Location.-The Muskingum River, 111.75 miles in length, and
tying entirely in the State of Ohio, is formed by the junction of the
Walhonding and Tuscarawas Rivers at Coshocton, Ohio, flows in a
southerly direction and empties into the Ohio River at Marietta,
Ohio, 172.2 miles below Pittsburgh, Pa.
   Existing project.-This authorized the taking over, restoration,
maintenance, and operation of the State works and plant to provide
slack-water navigation between lock no. 1, at Marietta, Ohio, and
Dresden, Ohio, a distance of 93 miles. Navigation is afforded by 11
locks and dams and 4 short lateral canals. The maximum depth
which it is now possible to maintain without extensive improvement
is 4.5 feet, although in certain portions 5.5 feet is available. Above
the site of the old lock no. 11 the minimum depth actually main-
tained is 2 feet. The navigable depth between lock no. 1 and the
mouth, a distance of 0.25 mile, is provided by dam no. 18, Ohio River,
and by dredging.
   The original estimate of cost of restoring the dams taken over
from the State of Ohio was $200,000. To this was added later the
construction of a new lock and dam no. 11, at a cost of about $143,000,
the repair and extension of a levee at dam no. 10, and some minor
work, the net total expended from specific appropriations having
been $301,722.53. The estimate of annual cost of operation and care
of the locks and dams, made in 1937, is $99,500. The construction
of a new lock no. 1 was done in connection with the construction of
an ice harbor as part of the Ohio River improvement and was not a
part of this project. Operating and care of the locks and dams were
included in the project July 1, 1935, under the provisions of the
Permanent Appropriations Repeal Act approved June 26, 1934.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for taking over
from the State of Ohio the locks and dams then in existence (nos.
1 to 10) and the restoration of these works by the United States
 (H. Doc. No. 48, 49th Cong., 1st sess.); the act of March 3, 1905,
provided for the construction of lock and dam no. 11 and the ex-
tension of the levee at lock no. 10 and other new work of minor
importance (H. Doc. No. 241, 58th Cong., 2d sess.). No map of the
river has been published.
1096              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The following table gives the characteristics of the locks and dams:

                                                                                        Lock


Lock                                                 Dimensions
and         Location (nearest                                                Upper     Lower
dam         town, all in Ohio)        Miles                       Great-       sill      sill
no.                                    from                                  below     below      Lift           Foundation
                                      mouth- Width                  est      upper     lower
                                             (clear)               avail-     pool      pool
                                                                  length
        1                                                 -- I.

                                                                              Feet      Feet      Feet
   1        Marietta.       -- _--_       0. 25      56            179        7. 58     10. 84    14.29    Piles in sand and gravel.
   2        Devols_________ ___           5. 79      36            160        6. 00      5. 50    10.76    Rock.
   3        Lowell 2____________         14. 20      36            160         7. 00     5. 50    14. 19   Piles.
   4        Beverly 2 -...-              25. 13      36            160        6.00       5. 52     9. 32   Gravel.
   5        Luke Chute __--..            34. 12      36            160        6.00       5. 50    10. 76   Rock.
   6        Stockport-...       --       40. 17      36            160        6.00       5.50     12.33        Do.
   7        McConnelsville ___           49. 63      36            160        6.00       5. 50    10. 10       Do.
   8        Rokeby Lock ___...           57. 45      36            160        8. 00      5. 50    10. 96   Piles and grillage.
   9        Philo .. ___.......          68. 56      36            160        8.00       5. 50    11.01    Rock.
                                         77. 41                    156.5
  10        Zanesville 23.......                     35. 5                    6. 50     1 7. 4    15.43    Rock and gravel.
                                                                               9.00
  11        Ellis........--......        85. 92      36            160         5.00    } 7.12 {      75 }Piles in   sand and gravel.



Lock                                                                        Dam
and         Location (nearest                                                                                   cWhen
dam         town, all in Ohio)                                                                                  corn-     Total cost 6
no.                                              Foundation                   Type of construction (all       pleted
                                                                                     fixed dams)


    1       Marietta .--------...... Sand and gravel_                          Rock-filled timber crib ..._
                                                                      ..---------                                1890 7   $327, 500. 00
    2       Devols----------
                         ..        ..    Rock...---------         ----------- do ------------------
                                                                                         _                       1840       91,000. 00
    3       Lowell 2--..        --.... _     do ..        ---   -do-...-                                         1840      160, 000. 00
    4       Beverly 2 ..---           _ Rock and gravel------------                 do -----------------         1840      122, 000. 00
    5       Luke Chute------------do..-------------------do_------------------1840                                          91,000. 00
    6       Stockport- __ ....           Rock.                                      do ------------------
                                                              ....--------------------                           1840       88, 000. 00
    7       McConnelsville 2__ Rock and gravel------------..do------------------1840                                       127, 000. 00
    8       Rokeby Lock..... Piles in sand and gravel-                            . do        _----------------- 1840       90, 000. 00
    9       Philo.........-----------. Rock..................-------------------...do-----------------1891 8                86, 000. 00
   10       Zanesville 2 3 .....         Soft rock _-___             ______-----.do -----------------
                                                                                           _                     1840      127,000. 00
   11       Ellis---............... (9)----     -------------- Concrete ---------------- 1910 10                           143,095. 66

  1 Normal lift above normal pool of dam no. 18, Ohio River. Lock no. 1 has intermediate gate, only lower
chamber usable.
  2 Lateral canal between dam and lock.
  3 Double lock, flight of 2 tandem.
  4 Movable top of 4 feet high of Boule gates.
  5 Crest of fixed part.
  6 Cost to the United States, $301,722.53, exclusive of cost of lock and dam no. 1, which was constructed
under the Ohio River project.
  7 Replaced an older lock on opposite side of river.
  8Replaced an older lock constructed in 1840 at lower end of lateral canal which was also abandoned.
  9 150 feet of dam adjacent to lock on piles in sand and gravel. Remainder of dam, including pier and
abutment, on rock.
  20 Replaced an older lock and dam located 2.6 miles farther upstream.



   Local cooperation.-Fully complied with.
   Terminal facilities.-Terminal facilities consist of a privately
owned wharf boat at Marietta, at a point on the Ohio River approxi-
mately 600 feet above the mouth of the Muskingum. There are num-
erous public and private landings, generally, unimproved, at points
accessible to the public highways, and in a few instances having
railroad connections. Coal tipples exist at river miles 71 and 85,
respectively. A dock for loading coal from motor trucks to barges is
located at mile 72. Coal shipped from these points is unloaded at
a slip situated at mile 68. Three yards principally equipped for
        RIVERS AND HARBORS--ZANESVILLE, OHIO, DISTRICT                        1097
unloading sand and gravel are situated at miles 0.1, 0.9, and 76, respec-
tively. Numerous landings, not equipped, are used to stock pile
sand and gravel for State and county roads. Nine private ter-
minals for handling petroleum products exist on the river.
   Operations and results during fiscal year.-The locks and dams
were operated as required and the necessary repairs to maintain in
serviceable condition were made thereto and to the appurtenant
structures. Navigation through lock no. 9 was suspended for 3 hours
on March 17, 1937, due to a broken valve leaf and was suspended on
June 6 and 7, 1937, to permit the installation of a new valve. New
heating plants were installed in the lockmasters' dwellings at locks
9 and 11. The total cost of maintenance and improvement was
$89,428.67, all of which was for operating and care of locks and
dams. The total expenditures were $82,127.45.
   Condition at end of fiscal year.-The locks and dams as a whole
are in a fair condition considering 'their age-nearly 100 years.
The available depth for navigation is 4.5 feet. The total cost at the
end of the fiscal year was as follows:
New work--------------           ------------------------------- $301, 722.53.
Maintenance (repairs to levee dam no. 10, Zanesville, Ohio, act of
  Mar. 3, 1925) -----------------------------       -------------   5, 462. 08:
Maintenance and improvement (operating and care)-----___-------- 181, 342. 10

       Total -------------------------------------------                 488, 526. 71
   The expenditures for new work and maintenance were $478,983.48.
   In addition the sum of $3,995,355.89 was expended between April
7, 1887 and June 30, 1936 on the operation and care of the works of
improvement under the provision of the permanent indefinite
appropriation for such purposes.
  Proposed operations.-Thebalance unexpended, including accounts
receivable, all maintenance and improvement funds, on June 30, 1937,
together with allotments of $94,000 made during July 1937, will be
applied as follows:
Accounts payable on June 30, 1937__------------_   ------                 $9, 646. 77
Maintenance: Dredging (by hired labor) July 1937 to June 1938--           37, 889. 54
Maintenance (operating and care) :
    Operation (by hired labor) -------------------        $30, 840. 00
    Ordinary repairs (by hired labor) ---------------- 3, 825. 00
    Improvement and reconstruction (by contract) ...       23, 530. 00
                                                                          58,195.00
       Total for all work__   ---------------------------------- 105, 731. 31
  The sum of $99,500 can profitably be expended during the fiscal
year 1939 as follows:
Maintenance: Dredging (by hired labor) --             --------------------- $35, 000
Maintenance (operating and care) :
    Operation (by hired labor) -------------------------            $33, 000
    Ordinary repairs (by hired labor) ---------------------           5, 000
    Improvement and reconstruction (by contract) -------             26, 500
                                                                             64, 500

       Total for all work ______              ______----------------------99, 500
1098                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                    Cost and financial summary
Cost of new work to June 30, 1937----------                                                      _______ -        $301, 722. 53
Cost of maintenance to June 30, 1937                                                                -------- ' 14,182, 160. 07
                                                                                                             _------

      Total cost of permanent work to June 30, 1937 ----------                                                                       4, 483, 882. 60
Plus accounts receivable June 30, 1937 _------------------__                                                                          -      103. 54

                                               -    -
     Gross total costs to June 30, 1937 ___________--        -___                                                                    4, 483, 986. 14
Minus accounts payable June 30, 1937_ -         -    - ___--   __--                                                                    -9, 646. 77

     Net total expenditures_-----___     -__- -____ -_                                                                              14, 474, 339.37
Unexpended balance June 30, 1937-----_--------_---  -----                                                                                11, 627. 77

             Total amount appropriated to June 30, 1937_-__ ______                                                                  14, 485, 967.14

     Fiscal year ending June 30                             1933              1934                 1935                      1936                 1937

Cost of new work .....               .    .     . .     .     .    . .    .    .     .   .   .     .      .   .    .     .          . . .    .       .     .
Cost of maintenance-----------............            $170,299. 43       $168, 946. 88       $113, 046. 51             $120, 481. 74             $89, 428. 67
'Total expended...----------------...............      119, 073. 06       132, 803. 60           134, 290. 64           119, 603. 96              82, 127. 45

Allotted            ...---------------------           121, 745. 28       204, 809. 67           194, 100. 00            72, 501. 71         -12,        000. 00


Balance unexpended July 1, 1936---------------------------                                                                               $105, 755.22
Deductions on account of revocation of allotment_ .- _____--
                                                          -                                                                          -     12, 000. 00

      Net amount to be accounted for_                                                                                                       93, 755. 22
Gross amount expended-------------            -                                                           $84,268. 17
Less reimbursements collected________________                                                               2, 140. 72
                                                                                                                                            82, 127. 45
      Balance unexpended June 30, 1937_________                                                                   _______                   11, 627. 77
Outstanding liabilities June 30, 1937--__                                                                                                   11, 601.05

      Balance available June 30, 1937_                                                                                                              26. 72
Accounts receivable June 30, 1937_                                                  _____                                                         103. 54

      Unobligated balance available June 30, 1937_                                                                                                 130. 26
Amount allotted from War Department Appropriation
                                      _
  Act approved May 15, 1936_______--------- --     $5, 500. 00
Amount allotted from War Department Civil Appro-
priation Act approved July 19, 1937--------------88, 500. 00
                                                                                                                                            94, 000. 00

       Balance available for fiscal year 1938__           ______                                                                            94, 130. 26
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance 2__-                                                                                                       99, 500. 00
  1Includes $3,995,355.80 from permanent indefinite appropriation.
     2 Exclusive of available funds.

                      2. MUSKINGUM RIVER VALLEY RESERVOIRS, OHIO

   Location.-The Muskingum River Valley lies in southeastern Ohio,
and the river, with its tributaries, drains approximately 8,000 square
miles. Its headwaters rise about 25 miles south of Lake Erie and
it flows into the Ohio River at Marietta, Ohio, 172.2 miles below
Pittsburgh, Pa.
   Existing project.-Under the provisions of the National Industrial
Recovery Act the Public Works Administration made an allotment
of $22,090,000 to aid in financing the construction of 14 reservoirs
and for stream-channel improvement, by straightening, widening,
       RIVERS AND HARBORS-ZANESVILLE,           OHIO, DISTRICT    1099
and deepening the stream and construction of walls and levees, and
other works incident thereto, in the Muskingum Valley of eastern
Ohio. The construction of 15 reservoirs was originally authorized
by the Public Works Administration February 20, 1934, and one
reservoir (Freeport) was eliminated and the stream-channel im-
provement of the Tuscarawas River at Massillon, Ohio, authorized
February 8, 1935 (amended official plan approved by the Chief of
Engineers May 16, 1935). An additional amendment of the official
plan, providing for a change in the right-of-way of the relocated
Baltimore & Ohio Railroad in the Bolivar Reservoir, was approved
by the Chief of Engineers August 19, 1936, and on May 13, 1937,
the conservancy court further approved the elimination of stream-
channel improvement of the Tuscarawas River at Massillon, Ohio,
from the official plan. An additional allotment of $3,500,000 was
made February 13, 1936, by the Public Works Administration, to
cover the increased cost of the reservoirs and local protective works.
The allotments were made on the application of the Muskingum
watershed conservancy district, which has agreed to furnish rights-
of-way, flowage rights, and other expenses not directly involved
in the actual construction of the reservoirs and local protective works.
The total estimated cost of the project to the Government, exclud-
ing the cost to the Muskingum watershed conservancy district, is
$25,590,000.
  The project includes the construction of 14 reservoirs and stream-
channel improvement, all new work, located as follows:
                                                                                                                                                                                                                             ea


                                                                                                                                                                                                                                  Total      0


                                                                                                                                                                                                                                             O
                                                                                                            Square
                                                                                                             miles                                Acre-feet       Acre-feet Acre-feet            Inches        Acres              Acres
1       Atwood ..---------......--   Indian Fork-____.._-- __
                                      Sugar Creek_............
                                                                         New Cumberland-....
                                                                         Beach City-..........
                                                                                                                  70
                                                                                                                 300
                                                                                                                          941
                                                                                                                          976. 5
                                                                                                                                    928
                                                                                                                                    948
                                                                                                                                                    26,100
                                                                                                                                                    70, 000
                                                                                                                                                                    23, 600
                                                                                                                                                                     1,700
                                                                                                                                                                              49, 700
                                                                                                                                                                              71, 700
                                                                                                                                                                                                     7.0
                                                                                                                                                                                                     4.4
                                                                                                                                                                                                                1, 540
                                                                                                                                                                                                                  420
                                                                                                                                                                                                                                    2, 570
                                                                                                                                                                                                                                    6,150
                                                                                                                                                                                                                                             0
2       Beach City-...-.....
3       Bolivar_. __          ...    Sandy Creek..............          Bolivar..._.........                    502      962       895            149, 600               0  149,600                 5.6            0               6, 500   6

4       Charles Mill .......-        Black Fork ._                      Mifflin ...............                 216   1, 020       997             80, 600          7,400    88, 000                7.0        1,350               6, 050
5       Clendening....--------       Brushy Fork___ ...... _.           Tippecanoe-..........                    70      910. 5    898             26, 100         27, 900   54, 000                7.0        1,800               2,620    'T
6       Dover__--                                          -
                                      Tuscarawas River .......           Dover................                1, 397      916       874            202, 000          1,000 203, 000                  5.0          350              10,100    0
7       Freeport 1
8       Leesville__________          McGuire Creek _-........           Leesville_.......__.      ..           48       977. 5      963            17, 900         19, 500        37, 400          7.0         1,000               1,470
9       Mohawk ___....__..           Walhonding River__...__.           Nellie_      . ..        . .        1,501       890         794. 5        285, 000               0       285, 000          6. 5             0              7,950    M
10       Mohicanville ..------        Lake Fork_ _____---                Mohicanville-.........                269       963         932           102, 000               0       102, 000          7.0              0              8,800    Z
11       Piedmont ...     _--....--   Stillwater Creek.........          Piedmont ..... __.__.                  84       924. 6      913            31, 400         33, 600        65, 000          7.0         2, 270              3, 200
12       Pleasant Hill_ ____..        Clear Fork_-__ .......             Perrysville ........--                199     1,065       1, 020           74, 200         13, 500        87, 700          7.0            850              2, 600   -
13       Senecaville ..........--     Seneca Fork_______.......          Senecaville...-----......             121       842. 5      832. 2         45, 000         43, 500        88,500           7.0         3,550               5,170    Z
14       Tappan_- ----------          Little Stillwater Creek_....       Tappan .............                   71       909         899. 3         26, 500         35, J00        61,600           7.0         2, 350              3,100    M
15       Wills Creek..----------      Wills Creek -_- __.. _.--_         Conesville-............               844       779         742           190, 000          6, 000       196, 000          4. 9           900             11, 450   M
     I                            i                                  i                                  i                                     I               I               I              I             I             I
1The construction of Freeport Dam was eliminated by the amended official plan approved by the Chief of Engineers May 16, 1935.




                                                                                                                                                                                                                                             -1
                                                                      SDam
                                                                                                                              -~-UII-----L--CI---II~------~--~- ---       --- - I I-      __ __I_-~ ------)1----C-
                                                                    Location of dam                 Miles                                                                                              Outlet gates
No.        Name of reservoir                    Stream                (nearest town,                above
                                                                     all in Ohio)                   mouth   Height                                                                                                             Esti- "
                                                                                                     Muth of  dam            Foundation 2 .     Type of spillway           Type of outlets                                    mated
                                                                                                    Mukins-n(feet)l                                                                              Num-           Size          cost 3
                                                                                                   kinguver                                                                                       ber          (feet)
                                                                                                    River
   -I                                I                        -1                              "i              i        1-1-----                                       i



  1       Atwood....---------            Indian Fork-.....          New Cumberland_                  187.2         55 Rock and pervious Saddle .------------3 conduits---- ----                          3   33 x 7___   $798, 978
  2       Beach City_ ..__.              Sugar Creek.... ..         Beach City,------                180.0         55 Pervious.---__.      _do.........------
                                                                                                                                          ...                   2 conduits ----.    -                    67 x 15 .... 2, 838, 510
  3       Bolivar___ ...      ...        Sandy Creek......          Bolivar-    ------               183.4         82 ...do..------.---     ..do ..-.. ...----  2 tunnels.---     -                      67x15...._ 3, 936,754
  4       Charles Mill ._...__           Black Fork.......          Miffin----------                 181.5         47 Rock and pervious Concrete overflow___ 5 short conduits_ -                         53 x 7 ___ 1,032, 931
  5       Clendening- ......             Brushy Fork-.....          Tippecanoe------.                178. 8        62 Pervious---------- Saddle..----------..   1 tunnel ....                            33% x 7.--        579, 652
  6       Dover_----------.              Tuscarawas River_          Dover..---------                 174. 0        56 Rock-..--------      Concrete overflow -_ 18 short conduits -                     12
                                                                                                                                                                                                                       5, 392, 744
                                                                                                                                                                                                          5 x 1 0. . -
  8       Leesville----.........__       McGuire Creek _            Leesville.-._--__                193.4         70 Pervious- .....     Saddle..- - - -- - - 1 tunnel- ________                       3 3% x 7 --        715,165  O
  9       Mohawk ___...__.               Walhonding River           Nellie ----------                129.9        100    .do------_----      _do_------  -- -- 2 tunnels---- --                         6 8x17 ....    3,--603, 724
10                      -
          Mohicanville- .--              Lake Fork ____.            Mohicanville-....                171.7         38 _ . do . _._ ...... Concrete overflow_.. 3 short conduits-_ _                     3 7x12-....        582, 272
11       Piedmont ......
                     _-         Stillwater Creek__ Piedmont- ......                                  191.0         56 Impervious .....-
                                                                                                                                    -     Saddle----__--__--    1 tunnel-_____-- __                     4 3, x 7___        693, 560
12       Pleasant Hill_....... Clear Fork._____   Perrysville-------                                167. 9       110 Rock and pervious Saddle and morning 1 wye tunnel-,---                           52 3/j x 7___ 1, 298,    955 N
                                                                                                                                            glory.
13       Senecaville .......- Seneca Fork.. ___                    Senecaville. ---     --          179. 3        49 Impervious _..-._   Concrete overflow.._ 2 short conduits 4.                       2   3% x 7-     -      693, 566
14       Tappan-............ Little Stillwater
                                 Creek.
                                                                    Tappan-_-----                    171.0         52 Pervious....---.... Saddle..... --        1 tunnel_.--                             3                    1,115, 589    M
                                                                                                                                                                                                                                            00
15       Wills Creek........ Wills Creek ......                    Conesville-       ....           107. 3       64      Pervious and im-     Side channel--l        12 conduits-........               6   7 x 15 ..        1,833,569
                                                                                                                            pervious.
          Local protective                                                                                                                                                                                                         031
                                                                                                                                                                                                                                474,
           work.
                 Total...            ........            ..        .................---------....------------------                                                          _----------------------                         25, 590.000

      12 Height of dam from valley floor to top of nonoverflow portion of dam.
         All dams listed are roll-fill earth except Dover, which is gravity-type concrete.
      3 Includes dams, spillway, and outlet structures; and relocation and/or changes to railroads and public utilities, and the cost of preparation of the official plan.
      4
      A Also 2 sections of overflow weir with 1 crest gate on each section.
        Also 3 sets of orifices at conservation elevation for automatic discharge.                                                                                                                                                         00
                                                                                                                                                                                                                                            H




                                                                                                                                                                                                                                           F--
                                                                                                                                                                                                                                           0S
1102     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-Underan agreement entered into on March 29,
1934, as amended February 8, 1935, between the Public Works Ad-
ministration and the Muskingum Watershed Conservancy District
the district agrees to contribute to the cost of the project by making
available and expending the sum of $12,000,000. This contribution
shall include title in the district to all necessary lands and easements,
the cost of appraisals and other administrative and legal expenses,
and the expense (including construction costs) of all necessary relo-
cations and vacations of public highways. The conservancy district
further agrees to maintain, operate, and protect the completed proj-
ect, and that operation shall be in such manner as in the judgment
of the Chief of Engineers will best serve the interests of navigation
and flood control on the Muskingum and Ohio Rivers. It also agrees
to save the United States harmless from all claims for damages arising
from the construction, maintenance, and operation of the project.
Since the total of the conservancy district's expenditures and commit-
ments as of January 1, 1936, were less than $12,000,000, the amount
stipulated in the agreement, the conservancy district has agreed to
make available and expend or cause to be expended in the suc-
ceeding 2 years an amount not less than the difference between said
total and said sum of $12,000,000, if and to the extent that the Chief
of the Corps of Engineers shall deem such expenditures necessary for
the accomplishment of the project and official plan and properly to be
contributed by the conservancy district.
   The conservancy district is engaged in making appraisals and
securing the necessary titles, easements, and flowage rights. This office
has received, and it is anticipated that it will continue to receive,
full cooperation from the Muskingum Watershed Conservancy
District.
   Operations and results during fiscal year.-Contract drawings and
specifications were completed for two levees, one railroad relocation,
one bridge, two public-utility relocations and an operator's quarters.
Seventeen agreements were made with public utility companies for
relocations of their facilities. Preliminary studies were completed
for the Massillon Channel improvement. Soil laboratory tests were
made for the Cincinnati, Pittsburgh, St. Paul, Boston, Washington,
and Mineral Wells districts, also for the Works Progress Administra-
tion in Ohio and the Forest Service branch of the Soils Conservation
Service. Laboratory tests of cement and concrete samples were con-
ducted for the Office, Chief of Engineers, the Ohio River Division, and
the Huntington district.
   New work by contract on the dams, railroad relocations, levees, pub-
lic-utility relocations, and operator's quarters was accomplished as
follows :
   Atwood Dam.-Ninety-eight percent of the common excavation, 72
percent of the excavation in borrow pits, and 79 percent of the rock
excavation in quarry were completed. Rock excavation in the spill-
way was started. Placing earth fill in the dam embankment, 3,700
feet long and 55 feet high, was 93 percent completed. Concrete place-
ment was completed for conduits, stilling basin, and key walls and
was 89 percent completed for the intake structure. The entire con-
tract is 74.2 percent complete. Construction of the operator's quarters,
by separate contract, was completed.
       RIVERS AND HARBORS-ZANESVILLE, OHIO, DISTRICT               1103
   Beach City Dam.-Ninety-four percent of the common excava-
tion, 91 percent of the borrow pit excavation and 89 percent of the
rock excavation for outlet structures and channels were completed.
Placing concrete was 97 percent completed in the intake and transi-
tion, 87 percent in the conduits, 60;percent in the key walls, 98 percent
in the bridges, and 90 percent in the outlet portal and stilling basin.
Placing embankment in the main dam and dike, 4,800 feet long
and 55 feet high, was 83 percent completed. The erection of the
operating house superstructure was 80 percent completed and the
installation of gates and accessories was 63 percent completed. The
entire contract is 92.2 percent complete.
   Relocation of Baltimore & Ohio Railroad, Beach City Reservoir.-
The 5.25 miles of railroad relocation was completed. Construction
of the steel bridge over Sugar Creek, by separate contract, was
completed.
   Relocation of Wheeling & Lake Erie Railway, Beach City Reser-
voir.-In the 9.33 miles of railroad relocation, 97 percent of the
unclassified excavation grading, 99 percent of the borrow grading
and 98 percent of the foundation excavation were completed. Laying
and ballasting of track were 99 percent completed. Concrete place-
ment was completed and all cast iron pipe culverts were placed. The
new station building at Dundee was completed with the exception
of some minor details. The entire contract is 98 percent complete.
Construction of the steel bridge over Sugar Creek, by separate
contract, was completed.
   Relocation of Ohio Telephone & Telegraph Co. cable line, Beach
City Reservoir.-Thirty-five percent of the work of removing exist-
ing structures and 28 percent of the excavation for tower footings
were completed. The entire contract is 6.2 percent complete.
   Brewster Levee, Beach City Reservoir.-The construction of the
levee and appurtenant works was completed.
   Bolivar Dam.-Ninety-five percent of the rock excavation for the
intake and stilling basin and 90 percent of the common excava-
tion were completed. Excavation for and placing steel lining in
the two tunnels was completed. Ninety-two percent of the concrete
in the intake and transition, 90 percent of that in the stilling basin
and 89 percent of that in the tunnel linings were placed. Placing
earth fill in the dam embankment, 6,300 feet long and 82 feet high,
was 89 percent completed. The erection of the operating house super-
structure was 70 percent completed and the installation of gates and
accessories was 99 percent completed. The stream was diverted
through the outlet works. The entire contract is 82.6 percent com-
pleted. Reservoir clearing, by hired labor, was completed.
    Relocation of Baltimore & Ohio Railroad, Bolivar Reservoir.-
Thirty-nine percent of the unclassified excavation, 98 percent of the
borrow grading and 69 percent of the foundation excavation were
completed. Sixty-four percent of the concrete and 83 percent of
the cast-iron pipe culverts were placed. Laying and ballasting of
the main track were 6 percent completed. The entire contract is
36.6 percent complete. Construction of the steel bridge over Sandy
Creek, by separate contract, was started.
      20196-37-pt. 1--70
1104    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1937


   Charles Mill Dam.-All work under the contract for the construc.
tion of the dam was completed. Construction of the operator's
quarters, by separate contract, was completed. Clearing the reser-
voir area, by hired labor, was 15.5 percent completed.
   Relocation of Erie Railroad, Charles Mill Reservoir.-The 4.24
miles of railroad relocation was completed. Construction of steel
bridges over Crawford Creek and Black Fork, by separate contract,
was completed. Construction of the Public Road Overhead Bridge,
near Pavonia, was completed by separate contract.
   Clendening Dam.-Common and borrow-pit excavation was com-
pleted. Ninety-nine percent of the rock excavation, in spillway
and all rock excavation for the intake and stilling basin was com-
pleted. Excavation from and placing concrete in the tunnel was
completed. All other concrete work was completed except for the
bridge across the spillway which was 75 percent completed. In
the main dam embankment, 946 feet long and 62 feet high, all tim-
pervious fill, 98 percent of the random fill and 99 percent of the rock
fill were placed. Erection of the operating-house superstructure was
90 percent completed. The entire contract is 85.3 percent complete.
   Dover Dam.-Eighty-nine percent of the common excavation, 75
percent of the rock excavation and 89 percent of the pressure grouting
for the foundations of the dam were completed. Eighty percent of
the concrete in the dam and appurtenant structures was completed.
The rolled embankment on the right abutment was completed and
75 percent of the clearing in the reservoir area was accomplished.
Sixty-eight percent of the installation of gates and accessories was
completed. The entire contract is 82.1 percent complete.
   Zoar Levee.-All work on this project was suspended during the
year.
   Relocation of Baltimore       Ohio Railroad, Dover Reservoir.---The
2.2 miles of railroad relocation and the channel change and levee at
the Federal Clay Products Co. plant at Mineral City were completed.
   Relocation of Pennsylvania Railroad, Dover Reservoir.-The 5.62
miles of roadbed construction for railroad relocation was completed.
Construction of the steel bridge over Conotton Creek, by separate
contract, was completed. Track laying and ballasting, also by sepa-
rate contract, were completed.
                           c&
   Relocation of Wheeling Lake Erie Railway, Dover Reservoir.-
In the 14.6 miles of railroad relocation, 89 percent of the unclassified
excavation and grading, 66 percent of the borrow grading, and 95
percent of the foundation excavation were completed. Placing con-
crete in culverts and in bridge piers and abutments was 95 percent
completed. Placing cast-iron pipe culverts was 95 percent completed.
Laying and ballasting of main line railroad track were 58 percent
completed and side tracks were 64 percent completed. The entire
contract is 77.7 percent complete. Construction of steel bridges over
Conotton Creek, the Tuscarawas River and a stream near New Cum-
berland, by separate contract, was completed.
   Relocation of East Ohio Gas Co. pipe lines, Dover and Bolivar
.Reservoirs.-In the Dover Reservoir, reconstruction of the Ripple
Farm valve station was 98 percent completed and construction of the
       RIVERS AND HARBORS-ZANESVILLE,         OHIO, DISTRICT    1105
Sattler Farm valve station was 60 percent completed. Placement of
58,850 linear feet of 12.75-inch pipe and 7,500 linear feet of 14-inch
pipe in the construction of the four new manifold lines was 98 per-
cent completed. The construction of four new manifold valve pits
was completed and the installation of 94 factory bends was 91 per-
cent completed. The relocation of the lines in the Bolivar Reservoir
was completed and the lines placed in service. The entire contract
is 88 percent complete.
    Leesville Dam.-Ninety-nine percent of the common excavation
and all rock excavation for the intake structure, stillirg basin, and
spillway were completed. Excavation for and placing concrete in
the tunnel were completed. Eighty percent of the concrete place-
ment for the service bridge, 29 percent for the stilling basin and:
spillway, and all that required for the intake structure and key walls
were completed. Placing earth fill in the dam embankment, 1,650
feet long and 70 feet high, was 97 percent completed. The entire
contract is 84.8 percent complete. Construction of the operator's
quarters, by separate contract, was completed.
    Mohawk Dam.-Ninety-nine percent of the common excavation
was completed. Seventy-one percent of the rock excavation for the
spillway and all that for the outlet works were completed. Excava-
tion from the two tunnels, each 361 feet long, was completed. Con-
crete placement was completed for all major structures except the
spillway where placement was 87 percent completed. Placing earth
fill in the dam embankment, 2,300 feet long and 100 feet high, was
98 percent completed. Eighty-one percent of the installation of
gates and accessories was completed. The entire contract is 98.2 per-
cent complete. Construction of the operator's quarters, by separate
contract, was completed.
   Relocation of Pennsylvania Railroad, Mohawk Reservoir.-The
1.85 miles of railroad relocation was completed. Construction of
the steel bridge over the Mohican River, by separate contract, was
completed.
    Mohicanville Dam.--Construction of the dam was completed.
Construction of the operator's quarters, by separate contract, was
completed.
   Mohicanville Reservoir dikes near Craighton.-Placingof the 133,-
400 cubic yards of earth fill in the dike embankments was 78 percent
completed. The entire contract is 71.4 percent completed.
   Piedmont Dam.-Construction of the dam was completed.
    Pleasant Hill Dam.-Ninety-seven percent of the common ex-
cavation, 79 percent of the rock excavation for the intake and outlet
structures and 93 percent of the tunnel excavation were completed.
Placing earth fill in the dam embankment, 780 feet long and 110 feet
high, was 18 percent completed. Forty-one percent of the rock fill
in the embankment, toe trench and rock dike was completed. Eighty-
two percent of the concrete placement in the tunnel lining, 86 per-
cent of that for the intake structure, and 95 percent for the stilling
basin were completed. The stream was diverted through the outlet
works. The entire contract is 60.2 percent complete. Construction
of the operator's quarters, by separate contract, was completed.
 1106     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Senecaville Dam.-Constructionof the dam was completed. Clear-
ing of the reservoir area to elevation 815 was completed by hired
labor.
    Tappan Dam.-Construction of the dam was completed.
    Willis Creek Dam.-Ninety-seven percent of the common excava-
tion was completed. Rock excavation for the spillway and outlet
structures was 99 percent completed. Concrete placement was com-
pleted for all major structures except the spillway floor which was
76 percent completed. Placing earth fill in the dam embankment,
1,950 feet long and 64 feet high, was completed and the placement
of rock fill in the embankment and toe trench was 97 percent com-
pleted. Clearing the reservoir area was 66 percent completed. The
entire contract is 92.9 percent complete.
    Relocation of Pennsylvania Railroad, Wills Creek Reservoir.-
The 3.37 miles of railroad relocation was completed. Construction
of the steel bridge over Wills Creek, by separate contract, was com-
pl:eted.
    The total cost of new work was $9,651,048.88. The expenditures
for new work were $9,989,545.45, all Public Works funds.
    Condition at end of fiscal year.-The entire project is 81 percent
complete. The preparation of the official plan; the design of the 14
dams and of all railroad and public-utility relocations; the construc-
tion of the Charles Mill, Mohicanville, Piedmont, Senecaville, and
Tappan dams; the construction of the Brewster and Pavonia levees;
the relocation of the Pennsylvania Railroad in the Dover, Mohawk
and Wills Creek Reservoirs, the Baltimore & Ohio Railroad in the
Beach City and Dover Reservoirs, the Erie Railroad in the Charles
Mill Reservoir, the East Ohio Gas Co. lines in the Atwood and Tap-
pan Reservoirs, and the Ohio Power Co. lines in the Bolivar Reser-
voir have been completed. Contracts have been entered into for 98
percent of the construction work, and the percentage of completed
work in each reservoir (including dams and all related works) is
as follows:
                                                                          Percent
Name of reservoir:                                                     Convpleted
   Atwood ---------------------------------------                              82
   Beach City-------------------------------------------------------92
   Bolivar -------------------------                                           66
   Charles Mill------------------------------------------------------          93
   Clendening --------------------------------------------------------         82
   Dover----__----------- --------------------------------                     74
   Leesville ---------------------------------------------------------         83
   Mohawk ----------------------------------------------------------           97
   Mohicanville ------------------------------------------------------         84
   Piedmont ---------------------------------------------------------          94
   Pleasant Hill----- -----------------------------------------------          58
   Senecaville-------------------------------------------------------          96
   Tappan----------------------------------------------------------            99
   Wills Creek------------------------------------------------------93
  The total cost for new work at the end of the fiscal year from
Public Works funds was $20,635,549.13 and the expenditures were
$19,753,688.85.
  Proposed operations.-The unexpended balance, including ac-
counts receivable, on June 30, 1937, of $5,845,615.30, will be applied
as follows:
        RIVERS AND HARBORS-ZANESVILLE,                   OHIO, DISTRICT             1107
Accounts payable June 30, 1937----...----------------------                  $925, 425. 50
New work :
    Atwood Reservoir on Indian Fork of Tuscarawas
      River :
        Construction of dam (by contract), includ-
          ing material and equipment furnished by
          Government, July to August 1937__------     $113,418. 68
        Clearing reservoir (by liired labor), July
          1937 to January 1938_------ ----              47, 821.37
        Relocation of public utilities (by contract),
          July 1937 to January 1938 -------------        6, 724. 05
                                                                              167, 964. 10
    Beach City Reservoir on Sugar Creek:
        Construction of dam (by contract), includ-
          ing material and equipment furnished by
         Government, July to August 1937________             130, 361.96
        Relocation of Wheeling & Lake Erie Ry. (by
          contract), July to October 1937____-- ___          67, 546.14
       Relocation of public utilities (by contract),
         July 1937 to June 1938------------------             67,178.86
                                                                   --         265, 086. 96
    Bolivar Reservoir on Sandy Creek:
        Construction of dam (by contract), includ-
          ing material and equipment furnished by
          Government, July 1937 to February 1938___          460, 228. 13
        Clearing reservoir (by hired labor), July
          1937 to June 1938 ---            ____-----------     1, 798. 14
        Construction of levees (by contract), July
          1937 to June 1938_________------ -__- -308,            089. 39
        Relocation of Baltimore & Ohio R. R. (by
          contract), July 1937 to February 1938_....         420, 672. 01
        Relocation of public utilities (by contract),
          July 1937 to February 1938------------             194, 175. 76
                                                                            1, 384, 963. 43
    Charles Mill Reservoir on Black Fork of Mohi-
      can River:
        Clearing reservoir (by hired labor), July to
          December 1937----___-------------      -            35, 406. 23
        Relocation of public utilities (by contract),
          July 1937 to June 1938---_---------                 19, 989. 76
                                                                               55, 395. 99
    Clendening Reservoir on Brushy Fork of Little
      Stillwater Creek :
        Construction of dam (by contract), including
           material and equipment furnished by Gov-
           ernment, July to August 1937__________             66, 911. 51
        Clearing reservoir (by hired labor), July to
           December 1937----------------___-- -----           34, 508. 41
        Relocation of public utilities (by contract),
           July 1937 to June 1938-------------___              4, 020. 44
                                                                              105, 440. 36
    Dover Reservoir on Tuscarawas River:
        Construction of dam (by contract), including
          material and equipment furnished by Gov-
          ernment, July to December 1937--     ______ 365, 431. 32
        Construction of levees (by contract), July
          1937 to January 1938______
                                ----          -____--    93, 508. 71
        Construction of operator's quarters (by hired
          labor), July to December 1937_ ----       -__ 11, 322. 22
        Relocation of Wheeling & Lake Erie Ry. (by
          contract), July to September 1937_ _____      530, 611. 24
        Relocation of public utilities (by contract),
          July 1937 to January 1938 _-__._____.__       141, 576. 26
                                                                            1, 142, 449. 75
1108     ,REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New work--Continued.
   Leesville Reservoir on McGuire Creek:
       Construction of dam (by contract), including
         material and equipment furnished by Gov-
         ernment, July to August 1937__---    _____ $148, 911.87
       Clearing reservoir (by hired labor), July to
         December 1937 -------------------------- 20, 462. 90
       Relocation of public utilities (by contract),
         July 1937 to January 1938_______________         928. 77
                                                                              $170, 303. 54
    Mohawk Reservoir on Walhonding River:
       Construction of dam (by contract), including
         material and equipment furnished by Gov-
         ernment, July to August 1937__                    113, 318. 00
       Relocation of public utilities (by contract),
         July to December 1937-----------------_            40, 178. 07
                                                                     -         153, 496. 07
    Mohicanville Reservoir on Lake Fork of Mohican
     River:
       Construction of levees (by contract) July to
                               __--------------
         December 1937__---_--_-10,                             906. 46
       Relocation of public utilities (by contract),
         July to December 1937---------- ----- --           39, 401. 66
                                                                                50, 308. 12
    Piedmont Reservoir on Stillwater Creek:
        Clearing reservoir (by hired labor), July to
            December 1937_ _-   _____   -                   47, 443. 78
         Relocation of public utilities (by contract),
           July to December 1937_---- __----------           5, 239. 04
                                                                                52.682. 82
    Pleasant Hill Reservoir on Clear Fork of Mohican
      River:
        Construction of dam (by contract), including
          material and equipment furnished by Gov-
          ernment, July to November 1937       _____       477, 834. 89
        Clearing reservoir (by hired labor), July
          1937 to January 1938----------------              19,893. 29
        Relocation of public utilities (by contract),
          July to December 1937_________-----               39, 355. 04
                                                                               537. 083. 22
    Senecaville Reservoir on Seneca Fork of Wills
      Creek:
        Construction of dam (by contract), including
          material and equipment furnished by Gov-
          ernment, July to August 1937-----------           21, 803. 88
        Clearing reservoir (by hired labor), July
          1937 to January 1938 ____________--
                                  -----                     49, 380. 32
        Relocation of public utilities (by contract),
          July to December 1987 ------------------           5, 216. 86
                                                                          -     76, 401.06
    Tappan Reservoir on Little Stillwater Creek :
       Construction of dam (by contract), includ-
         ing material and equipment furnished by
         Government, July to September 1937___.            167, 350. 36
        Relocation of public utilities (by contract),
         July to August 1937__________________               8, 799.04
                                                                               176, 149. 40
    Wills Creek Reservoir on Wills Creek:
        Construction of dam (by contract), including
          material and equipment furnished by Gov-
          ernment, July to August 1937_--____         - 80, 753. 11
        Relocation of public utilities (by contract),
          July 1937 to January 1938__________           28, 564. 67
                                                                               109, 317. 78
    Local protective works--------                                 __
                                                          _ _......-           473,147. 20
       Total------------                        - -----              _- 5, 845, 615. 30
            RIVERS AND HARBORS--ZANESVILLE, OHIO, DISTRICT                                                                             1109
  It is estimated that funds will be expended at the average rate of
$490,000 per month during the fiscal year 1938 and that all work will
be completed by June 30, 1938.
  No additional funds can profitably be expended during the fiscal
year 1939.
                                             Cost and financial summary
Cost of new work to June 30, 1937______________---__------                                                         $20, 635, 549. 13
Cost of maintenance to June 30, 1937______------------------                                                       --------------
       Total cost of permanent work to June 30, 1937-- --------                                                      20, 635, 549. 13
Undistributed costs June 30, 1937-____________---__--------                                                              34, 261. 07

Net total cost to June 30, 1937 __-------------__-------
                                          _-              --                                                         20, 669, 810. 20
Plus accounts receivable June 30, 1937-----------------------                                                             9, 304. 15

       Gross total costs to June 30, 1937----------------------20,                                                          679, 114. 35
Minus accounts payable June 30, 1937______________________                                                                 925, 425. 50

     Net total expenditures_------                                             ----------                            19, 753, 688. 85
Unexpended balance June 30, 1937____                                          -5,
                                                                       _____-------                                      836, 311. 15

         Total amount appropriated to June 30, 1937----                                            ___-__ -25,             590, 000. 00

   Fiscal year ending                 1933                  1934                     1935                 1936                       1937
         June 30


Cost of new work ....      ------                      -_ $150, 603. 42        $1, 879, 067. 71     $8, 954, 829. 12         $9, 651,048. 88
Cost of maintenance ....        ...          .   ---                           -------.......
                                                        ----...........------ ...                  -...      ....      ...........          ..
                ---------
Total expended __..          _ _-                          107, 643. 96          1, 778, 297. 80     7, 878, 201. 64           9, 989, 545. 45
Allotted.----------     ----------------               22, 090, 000. 00 ---------------              3, 500,000.00-----------


Balance unexpended July 1, 1936----------------------------     $15, 825, 856. 60
Gross amount expended ---------------------- $10, 089,133. 22
Less:
    Reimbursements collected -     $90, 108. 09
    Receipts from sales __________   9,479. 68
                                                    99, 587. 77
                                                                  9, 989, 545. 45

         Balance unexpended June 30. 1937_--                                       _______________                     5, 836, 311. 15
Outstanding liabilities June 30, 1937                                   _________               $27, 817. 84
Amount covered by uncompleted contracts                                          -----      5, 808, 493. 31
                                                                                                                       5, 836, 311. 15
     Balance available June 30, 1937________________________
Accounts receivable June 30, 1937                                                                                               9, 304. 15
         Unobligated balance available June 30, 1937____________                                                                9, 304. 15

    3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                  (GENERAL)

   The total cost, of work during the year was $5,038.11. The
total expenditures were $4,308.28. The unexpended balance to-
gether with allotment of $3,350 made during July 1937 will be ap-
plied as needed during the fiscal year 1938 to payment of expenses
incurred under this heading.
   No additional funds will be required for the fiscal year 1939.
1110           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                        Cost and financial summary
Cost of new work to June 30, 1937--_______------------                                                                  ----------
Cost of maintenance to June 30, 1937_ __ ----                                                   ___          __---$49,048.87

      Total cost of permanent work to June 30, 1937------------                                                           49, 048. 87
Undistributed costs June 30, 1937----------------------------                                                              -- 130. 90

      Net total cost to June 30, 1937 .......-                                                                             48, 917.97
Minus accounts payable June 30, 1937__________
                                           -----                                                                            1, 196.62

     Net total expenditures --------------------------------                                                               47, 721.35
                                ----------------------------
Unexpended balance June 30, 1937_                                                                                           1, 196.62

           Total amount appropriated to June 30, 1937----------------48, 917. 97

           Fiscal year ending June 30                       1933                1934          1935            1936             1937


Cost of new work-             -     -         -
Cost of maintenance           ____
                         ----------------- ____------------                   $6,812. 17   $29, 451. 99     $7, 746. 60       $5, 038. 11
Total expended       ....--------------------- ------------                    6,402. 70    26, 338. 88     10, 671. 49        4,308. 28
Allotted.....---------------------------------------                           9,917. 97    35, 000. 00      5,000. 00       -1, 000. 00


Balance unexpended July 1, 1936_________     -   -    --       $6, 504.90
Deductions on account of revocation of allotment---------------1, 000. 00

       Net amount to be accounted for_____          ---  _____-       _                                                    5, 504.90
Gross amount expended _---.-------...    ______--  -       - $5,288. 90
Less :
    Reimbursements collected---------------$978. 37
    Receipts from sales ----------------       __.      2. 25
                                                                980. 62
                                                                                                                            4, 308.28
      Balance unexpended June 30, 1937-------- ---------------                                                              1, 196. 62
Outstanding liabilities June 30, 1937---------------------------                                                            1, 196. 62

Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937__-------------------------------------                                                               3, 350.00
Balance available for fiscal year 1938___--------------------------                                                         3,350. 00
           4. PLANT ALLOTMENT FOR ZANESVILLE, OHIO, DISTRICT
                                        Cost and financial summary
Undistributed costs June 30, 1937__-        -
                                       _____---- -    __ __-      $1,004. 71
Plus accounts receivable June 30, 1937 --------------------------    664.96

      Gross total costs to June 30, 1937                                      --------------------                          1, 669.67
Minus accounts payable June 30, 1937                                                                 ----                      351.22
     Net total expenditures_      __        ________------------__                                                          1, 318.45
Unexpended balance June 30, 1937___-----------__------------------                                                             604.35
           Total amount appropriated to June 30, 1937----------------                                                       1,922. 80

           Fiscal year ending June 30                       1933                1934          1935            !1936            1937

                                                                                                                  673
Total expended-----          ----------------------------------------------                                 $1,      .45          -$355
Allotted        ----------------------------------------------------------                                   4, 422. 80          -2, 500
      RIVERS AND HARBORS-HUNTINGTON, W. VA., DISTRICT                                 1111
Balance unexpended July 1, 1936                                                   $2, 749. 35
Deductions on account of revocation of allotment------------------                 2, 500. 00

      Net amount to be accounted for------------------------------                   249. 35
Gross amount expended-------------------------------$4, 811. 38
Less:
    Reimbursements collected----------------- $4, 961.30
    Receipts from sales-----------------------    205. 08
                                                          5, 166. 38
                                                                                   -355. 00
      Balance unexpended June 30, 1937----------------------------                   604. 35
Outstanding liabilities June 30, 1937-------------------------------                 599. 20
     Balance available June 30, 1937------------------------------                     5. 15
Accounts receivable June 30, 1937----------------------------------                  664. 96
      Unobligated balance available June 30, 1937------------------                  670. 11
Status of reports called for by river and harbor acts and committee resolutions

                                                   Date trans-   Document no.
                                                                                Recommenda-
                                                                                    tion
      Locality             Authorization act       mitted to
                                                   Congress

Muskingum River,
Ohio:
  Flood   control   on   Flood Control     Com-_
    Tuscarawas River      mitt ee resolution,
    at Massillon.         Aug. 18, 1937.
  Flood control on       Flood Control Com-
    Licking River.         mitt e e resolution,
                           Mar. 19. 1937.
  9-foot depth, Mari-    Rivers and Harbors
    etta to Coshocton.     Committee resolu-
                           tion, Jan. 27, 1937.



  IMPROVEMENT OF RIVERS AND HARBORS IN THE
         HUNTINGTON, W. VA., DISTRICT
   This district embraces those portions of the States of Ohio, Ken-
tucky, West Virginia, Virginia, North Carolina, and Pennsylvania
lying in the drainage basins of the Ohio River and tributaries, exclud-
ing Muskingum River, from about mile 109 between Captina Island
and Powhatan Point, Ohio, to about mile 317.5 just below the mouth
of Big Sandy River, Ky., a distance of about 208.5 miles, but including
the following streams improved for slack-water navigation: Ohio
River, W. Va., with its locks and dams nos. 14 to 28, inclusive, and
Gallipolis Locks and Dam; Little Kanawha River, W. Va.; Kanawha
River, W. Va.; Big Sandy River, W. Va. and Ky., including Tug and
Levisa Forks.
   District engineer: Lt. Col. John F. Conklin, Corps of Engineers to
June 14, 1937, and Lt. Col. J. D. Arthur, Jr., Corps of Engineers,
since that date.
   Division engineer: Col. R. G. Powell, Corps of Engineers.
1112      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                 IMPROVEMENTS

                                    Page                                       Page
1. Construction of locks and               5. Little Kanawha River, W.
     dams, Ohio River ---------     1051        Va_ ---------------------      1112
2. Operating and care of locks             6. Kanawha River, W. Va--- .        1115
     and dams nos. 14-28, Ohio             7. Big Sandy River, W. Va. and
     River ------------------       1051        Ky., including Levisa and
3. Ohio River, open - channel                   Tug'Forks ---------------      1125
     work_-------------------       1051   8. Examinations, surveys, and
4. Ohio River Basin, flood con-                 contingencies (general)- -_.   1128
     trol--------------------       1051   9. Plant allotment-------------     1129
  1 to 4 inclusive.   For reports on these improvements see page 1051.

                      5. LITTLE KANAWHA RIVER, W. VA.

   Location.-This river, 160 miles in length, rises on the western
slope pf Laurel Hill, W. Va., flows in a general northwesterly direc-
tion, and empties into the Ohio River at Parkersburg, W. Va.
   Previous projects.--Adopted by the River and Harbor act ap-
proved August 14, 1876. The amount expended on previous projects
prior to commencement of operations under the existing project was
$214,418, of which $213,513.30 was for new work and $904.70 for
maintenance. For further details see page 1912 of Annual Report for
1915.
   Existing project.-This provides for 5 locks with fixed dams, to
give a navigable depth of 4 feet from the mouth of the river to
Creston, a distance of 48 miles. Under this project one lock and dam
 (no. 5) was constructed, and four locks and dams (nos. 1 to 4) were
purchased from the Little Kanawha Navigation Co.
   The cost of purchase and repair of locks and dams nos. 1 to 4 was
$282,059.50, and the cost of constructing lock and dam no. 5 was
$167,875. The estimate of annual cost of operation and care of the
locks and dams, made in 1936, is $32,300.
   The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the construction
of a lock and dam (no. 5) 2 miles above Burning Springs (Annual
Report of 1875, pt. 1, p. 740); act of March 3, 1905, provided for
the purchase and repair of locks and dams nos. 1 to 4, inclusive (H.
Doc. No. 309, 58th Cong., 2d sess., and Annual Report for 1904, p.
2607). Operation and care of the locks and dams were included in
the project July 1, 1935, under the provisions of the Permanent Ap-
propriations Repeal Act approved June 26, 1934. The latest pub-
lished map is contained in House Document No. 732, Seventy-first
Congress, third session. The following table gives the characteristics
of the locks and dams:
         RIVERS AND HARBORS-HUNTINGTON, W. VA., DISTRICT                                                                   1113
                                                       Little Kanawha River

                             Location                              Lock                     Available
                                                                dimensions                 depths over
                                                                                          miter sills at
                                                                                           normal pool
                                                               Great-           Lift at      levels            Year       Cost of
Lock                                                            est            normal                         of comr-   lock and
no.'                                                  Dis-    avail-           poolofo                                  lca
             Nearest town (all in                     tance     able Width      levels                        pletion      dam
               West Virginia)                         above    length
                                                      mouth       of                      Upper Lower
                                                               cham-
                                                                 ber

                                                      Miles     Feet    Feet    Feet      Feet     Feet
    1   Parkersburg..---------------............        3. 5      125     23       6. 4    11. 1      10. 2     1874
    2
    3
        Slate..................-----------------...
        Elizabeth----------------..................
                                                       14. 5
                                                       25. 5
                                                                  125
                                                                  125
                                                                          23
                                                                          23
                                                                                  11.3
                                                                                  11.0
                                                                                            9. 7
                                                                                            9. 7
                                                                                                       4. 4
                                                                                                       5.0
                                                                                                                1874
                                                                                                                1874
                                                                                                                          2$75,000
    4   Palestine -----------------                    31.0       125     23      11.9      8. 5       4.1      1874
    5   Burning Springs-----------...........          40. 5      125     26      12. 4     7. 6       4.0      1891           167, 875

  1 Character of foundation, rock; kind of dam, fixed.                    Type of construction--lock, stone; dam, timber
crib filled with stone.
                    .             Land wall of lock no. 5 on piles in gravel.
  2Purchase price

    Terminal                facilities.-Terminal facilities consist of a privately
owned wharf boat at Creston, at the head of slack water in pool no. 5,
and a gasoline- and oil-loading station and a stiff-leg derrick located
about 1/2 miles above the mouth of the river. The terminal facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-The locks and dams
were operated as required and the necessary repairs made. Naviga-
tion was suspended 31 days on account of extreme high water. The
cost of maintenance during the fiscal year was $12,956.13. The expen-
ditures were $15,015.08.
   Condition at end of fiscal year.-The locks and dams are in fair
condition. The available depth for navigation is 4.0 feet. The total
cost under the existing project to the end of the fiscal year was $316,-
340.97. of which $257,022.72 was for new work and $59,318.25 for
maintenance. The expenditures were $315,845.48, of which $257,-
022.72 was for new work and $58,822.76 for maintenance. In addi-
tion, the sum of $649,686.09 was expended between December 1891,
and September 30, 1935, on thile operation and care of the works of
improvement under the provisions of the permanent indefinite
appropriations for such purposes.
   Proposed operations.--The balance unexpended and accounts re-
ceivable at the end of the fiscal year, together with an allotment of
$11,700 made during July 1937, will be applied as follows:
Accounts payable June 30, 1937 -   -----------------------------      $495. 49
Operating and care.-Hired labor and Government plant:
    Fiscal year 1938:
        Operations                                        _
                           --------------------------------     _  10, 250.00
        Ordinary repairs    --------------------------------------     850. 35
        Improvement and reconstruction Aug. 1 to Sept. 30, 1937,
           repairs to abutment of dam, lock 3----------------------    850. 00
                         Total               ----------------------------------------                               12, 445. 84
1114         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The additional sum of $12,000 can be profitably expended during
the fiscal year ending June 30, 1939, to be applied as follows:
Operating and care of locks and dams:
   Operations .-----              ----------------------------------- $9,90
   Ordinary repairs--------------------------------------------           600
   Improvements and reconstruction                                        000,
                                                                       1------------------------
   Channel work------------------------------------------------           500

        Total----------                ---------------------------------------                                  12, 000

                                   Cost and financial summary
Cost of new work to June 30, 1937---------------------------                                            $470, 536. 02
Cost of maintenance to June 30, 1937------------------------                                            1709, 909. 04

      Total cost of permanent work to June 30, 197----------- 11,180, 445. 06
Minus accounts payable June 30, 1937_ --------------------------      495.49
     Net total expenditures------------------------------ 11, 179, 949. 57
Unexpended balance June 30, 1937----------------------------   -   745. 84
         Total amount appropriated to June 30, 1937-------------1, 180, 695. 41

        Fiscal year ending June 30                 1933          1934              1935          1936            1937


Cost of new work- - - -               - - - -             - -       - -     - - - - -                         --     -
Cost of maintenance..........------------------ $13, 634. 96  $9, 743. 82 $36, 899. 75 $24, 278. 75           $12, 956.13
Total expended.....----------------------       13, 242. 47    10, 161. 73       31, 120. 64   26, 616. 07      15, 015. 0
Allotted.........----------------------------   11, 196. 37    12, 901. 79       60, 500. 00    8, 891. 32       -300. 00


Balance unexpended July 1, 1936___ _________     ..                                                      $16, 060. 92
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-------                                                                                    700. 00
     Amount to be accounted for_                                                                             16, 760. 92
Deductions on account of revocation of allotment-----------                                                   1, 000. 00
      Net amount to be accounted for_                                                                        15, 760. 92
Gross amount expended--------------__                                    $15, 078. 86
Less reimbursements collected-__---                            -____-__-
                                                                      -        63. 78
                                                                                                             15, 015. 08
      Balance unexpended June 30, 1937_                                                                         745. 84
Outstanding liabilities June 30, 1937___                                            ____                        516. 87
         Balance available June 30, 1937_---------------                                         -              228.97
Unobligated balance available June 30, 1937-                                                                    228. 97
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937---                                                                                  11, 700. 00
         Balance available for fiscal year 1938--
                                               _______                            __________                 11, 928. 97
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 2__________ _______________                                                  12, 000. 00,
   1Includes $649,686.09 from the appropriation                operating and care of canals and other
works of navigation, indefinite.
2 Exclusive of available funds.
     RIVERS AND HARBORS-HUNTINGTON,           W. VA., DISTRICT    1115
                    6. KANAWHA RIVER, W. VA.

   Location.-This river, 97 miles in length, is formed by the junc-
tion of the New and Gauley Rivers, a short distance above Kanawha
Falls, W. Va., flows in a general northwesterly direction, and empties
into the Ohio River at Point Pleasant, W. Va.
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1873, and modified by the River and
Harbor Act of March 3, 1875 (Annual Report for 1875, pt. 2, pp.
90-98). (For further details see p. 1913, Annual Report for 1915.)
The cost and expenditures prior to commencement of operations
under the existing project were $4,294,612.25.
   Existing project.-The existing project provides for the construc-
tion of three dams on the Kanawha River, with twin locks having
usable dimensions of 56 by 360 feet, and one dam on the Ohio River
near Gallipolis, Ohio, with one lock 110 by 600 feet and one lock 110
by 360 feet, to furnish a 9-foot navigable depth from the mouth to a
point 90.57 miles above.
   The River and Harbor Act of July 3, 1930, provided for the re-
placement of old locks and dams nos. 2 to 5, inclusive, by the con-
struction of two new dams and dredging (H. Doc. No. 190, 70th
Cong., 1st sess.). The Public Works Administration, September 6,
1933, and the River and Harbor Act of August 30, 1935, authorized
the replacement of old locks and dams nos. 6 to 11, inclusive, by the
construction of one new dam on the Kanawha River and one new
dam on the Ohio River below the mouth of the Kanawha River, and
pertinent work (H. Doc. No. 31, 73d Cong., 1st sess.), in which docu-
ment the latest published maps are contained. Operation and care
of the locks and dams were included in the project July 1, 1935,
under the provisions of the Permanent Appropriations Repeal Act,
approved June 26 1934.
    The estimate of cost for new work, revised in 1937, is $24,455,000,
exclusive of amounts expended on previous projects. The estimated
cost for operation and care of the locks and dams, made in 1936, is
$248,000 annually.
   The following table shows the characteristics of the remaining
locks and dams of the original 6-foot navigation system and the locks
and dams of the new 9-foot system now under construction:
                                                                                                 Kanawha River

                         Location                         Lock dimensions                     Available
                                                                                             depths over
                                                                      .
                                                      i
                                                                                  Lift at    miter sills at
Lock                                                                              normal     normal pool       Character                                                                        Year of     Cost of
no.                                          Dis-
                                             tance
                                                           Greatest
                                                          available                 pool        levels         of founda-
                                                                                                                  tion
                                                                                                                                    Kind of dam               Type of construction of dam        com-      lock and       0
                  Nearest town                                                                                                                                                                  pletion      dam
                                                          length of Width          levels
                                             above                                                                                                                                                                        O
                                             mouth        chamber
                                                                                            Upper     Lower
                                                                                                                                                          i
                                                                                                                                                                                                                          O
                                             Miles            Feet        Feet      Feet     Feet      Feet
 (1)       London, W. Va_--              .   82. 76             360          56     24.00    18.00     12.00 Rock     ._...  Roller gates--....-----  Concrete movable crest ...-                   1934    23,282,200
 (3)
   66
           Marmet (Belle), W. Va ...
                                 --
           South Charleston, W. Va ....
                                             67. 75
                                             54.28
                                                                360          56   4 26.85    18.00     12.00     _do ....-- ___--do_..---..--.....   ..... do--------------......-------.....       1934    83,678.500
                                                                313          55      8.50    15. 25     6. 75 --- do .....-Movable chanoine .         Wicket pass and weir .....                    1886    6 337, 625
  57       St. Albans, W. Va...........      44.20              313          55      8.25    15.00      6.75 -- do----- ---... do.----------------   --...---
                                                                                                                                                           do.....-..---------                      1893    6341,136
  '8       Plymouth, W. Va---_ .---..        36. 22             313          55      8.00    16.25      8.25                                         -- -- do-....--
                                                                                                                               _do...----------.......                                   ----...-   1893 -_ 6 281,975
 (7)       Winfield (Red House), W.          31. 12             360          56     28.00    18.00     12.00 __do .....--    Roller gates- ........   Concrete movable crest.....                           26,938, 500
            Va.                                                                                                                                                                                                           0
  89       Buffalo, W. Va--------------       25.50             313          55     6.25     13.75      7. 50 __do--.......--
                                                                                                               .. do..... Movable chanoine ....                 Wicket pass and weir ....-----  1898         8 307, 120
810       Robertsburg, W. Va--_---.          19.20                          55                                           ---. do.............---------------.__
                                                                313                 7.00     14. 00     7.00                                                   .....   -
                                                                                                                                                                   do ......- ------ --- .- 1898             6 282,006
811       Henderson, W. Va.......             1.81             313          55     5.65     17.00     11.35 Hardpan-_ ---- do............---------....            do .......- -                 1898        6 637, 803
 (9)       Gallipolis, Ohio--   .---------
                                _             (10)
                                                          {     600         110
                                                                                  }26.00     18.00     12. 00 Rock..----  Roller gates.--------__
                                                                                                                                                                                      ------

                                                                                                                                                                Concrete movable crest..... ........       210,555,800
                                                                360         110


    1 London locks and dam. Replaced former lock and dam no. 2. Hydroelectric plant, licensed by Federal Power Commission, constructed at this site.                                                                      m
    2 Estimated.
    3 Marmet locks and dam. Replaced former locks and dams nos. 3 to 5, inclusive. Hydroelectric plant, licensed by Federal Power Commission,constructed at this site.                                                    U1


       4
      Head will be reduced to 24 feet upon completion of Winfield Locks and Dam.
    8 Will be replaced by Winfield Locks and Dam.
    6 Actual.
       7
      Winfield Locks and Dam. Locks completed and dam under construction. Will replace existing locks and dams nos. 6 to 8, inclusive. Hydroelectric plant, licensed by Federal
Power Commission, under construction at this site.
    8 Will be replaced by Gallipolis Locks and Dam on the Ohio River.
    6 Gallipolis Locks and Dam.     Locks completed and dam under construction: Will replace locks and dams nos. 9 to 11, inclusive, on the Kanawha River, and nos. 24 to 26,
inclusive, on the Ohio River.
    to 14 miles below Point Pleasant, W. Va., on the Ohio River.
     RIVERS AND    HARBORS-HUNTINGTON,       W. VA., DISTRICT    1117
   Local cooperation.-Under license no. 1175, issued by the Federal
Power Commission, the Kanawha Valley Power Co. has constructed
hydroelectric plants at London and Marmet locks and dams, a license
fee of $32,000 per annum having been fixed for each site. The Ka-
nawha Valley Power Co. has also been granted license no. 1290 pro-
viding for the construction of a hydroelectric plant at Winfield locks
and dam. The license fee is fixed at $40,000 per annum, and con-
struction is well under way.
   Terminal facilities.-The public terminal facilities consist of a
paved landing at Charleston, W. Va. There are three gasoline and
oil unloading stations at Charleston, Pratt, and Cabin Creek, but not
available for public use.
   Numerous coal tipples, owned by private interests, exist, available
for use only to the owners for loading into barges the coal mined by
them. The terminal facilities are considered adequate for existing
commerce.
             OPERATIONS AND RESULTS DURING FISCAL YEAR


  Regular funds-ne w work.-Installed gratings, stairways, and
handrailings, London and Marmet locks. Constructed an emergency
bulkhead storage platform, by contract, at Winfield locks at a cost of
$7,568.70. Constructed an emergency bulkhead storage platform, by
hired labor, at Gallipolis locks, Ohio River. Completed clearing
banks of the tributaries and main river, within the Gallipolis and
Winfield pools. Flowage surveys to determine the extent of flowage
damages in the Gallipolis and Winfield pools were continued. Se-
curing of certificates of title and negotiations with the owners of the
land affected by the new pool heights in the Winfield and Gallipolis
pools were commenced. Contract for dredging channel immediately
below Winfield locks was approximately 85 percent completed. Con-
tract for dredging channel at Tucker Branch and Big Hurricane Bar
was approximately 96 percent completed. Completed the removal of
old works, locks nos. 7 and 8, Kanawha River. Commenced the re-
moval of old works, locks nos. 25 and 26, Ohio River, and lock no. 11,
Kanawha River. The cost during the fiscal year was $434,697.33.
The expenditures were $392,115.96.
   Operating and care.-The locks and dams were operated as required
and necessary repairs made thereto and to the appurtenant struc-
tures. Roller gates nos. 1, 2, and 3 of Winfield Dam were placed in
operation May 15, 1937, and on May 30, 1937, the pool raised to ele-
vation 556.0 feet, thus discontinuing the operation of locks and dams
nos. 7 and 8. The cost during the fiscal year was $206,794.45. The
expenditures were $207,929.07.
   The total cost during the fiscal year was $641,491.78, of which
$434,697.33 was for new work and $206,794.45 for maintenance. The
expenditures were $600,045.03, of which $392,115.96 was for new work
and $207,929.07 for maintenance.
   Public Works funds.-New work.-Continued the acquisition of
flowage easements on nonnavigable tributaries and main river banks,
London and Marmet pools. Purchased the remaining land on the
abutment side of the London Locks and Dams. Continued work
under the contract for constructing the Gallipolis Dam, Ohio River.
The work under this contract is approximately 95 per cent completed.
1118    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

A towboat was assigned to assist commercial tows through the re-
stricted channel at the Gallipolis Dam until the completion of work
within the second cofferdam. From the beginning of construction
of the third cofferdam, which closed the navigable pass, a towboat was
required during periods when a surplus of water was in the river
to assist commercial tows in effecting a safe entrance into the auxil-
iary (riverward) lock. The contract for the construction of five
mooring cells at Gallipolis locks, Ohio River, was awarded May 18,
1937. Work under this contract is approximately 64 percent com-
pleted. The contract for construction of esplanade and appurte-
nant work at Gallipolis locks, Ohio River, was awarded June 10,
1937, and work commenced June 29, 1937. The total cost of new
work from Public Works funds during the fiscal year was $487,205.31.
The expenditures were $548,838.73.
   Emergency Relief funds--New work.-Dredging the channel in
the upper reaches of Winfield pool and the approaches to Winfield
and Gallipolis locks was completed. Continued work under the con-
tract for constructing the Winfield Dam. The work under this
contract is approximately 99 percent completed. Work under the
supplemental agreement to the contract for the Gallipolis parallel
locks providing for the extension to the upper guide wall was com-
pleted August 19, 1936, at a total cost of $127,615.11. Work under
the contract for the construction of the operation building and the
installation of operating equipment and the lock electrical system
for the Gallipolis locks was completed September 16, 1936, at a
total cost of $115,804.96. Work under the contract for furnishing
seven emergency bulkhead units for the Gallipolis Dam was com-
pleted July 20, 1936, at a total cost of $118,622.31. The contract
for construction of esplanade and appurtenant work at Winfield
locks was awarded June 10, and work commenced June 23, 1937. The
total cost of new work from Emergency Relief funds during the fiscal
year was $2,285,058.04. The expenditures were $2,488,099.14
   The total cost for the fiscal year, all funds, was $3,413,755.13 of
which $3,206,960.68 was for new work and $206,794.45 for mainte-
nance. The total expenditures were $3,636,982 90, of which $3,429,-
053. 83 was for new work and $207,929.07 for maintenance.
                  CONDITION AT END OF FISCAL YEAR

   Regular funds.-The existing project is 80 percent completed.
Old locks nos. 2, 3, 4, 5, 7, and 8, of the previous project have been
abandoned and removed, having been replaced by completed Mar-
met and London locks and dams and partially completed Winfield
locks and dam, of the existing project. Removal of lock no. 11 is
in progress. The remaining locks nos. 6, 9, and 10 will meet the
needs of navigation until their abandonment and removal, upon
the completion of the two new locks and dams now under con-
struction. The available depth for navigation is 6 feet from the
mouth to Charleston and 9 feet from Charleston to the head of
the improvement, 90.57 miles above the mouth. Above the improved
portion of the river the minimum depth in the open channel is less
than 1 foot. Clearing of banks for the pools of Winfield and Galli-
polls Dams is complete. Flowage surveys to determine the extent of
flowage damages in the pools of Winfield and Gallipolis Dams are
approximately 99 percent complete. Dredging of channel immedi-
      RIVERS AND HARBORS-HUNTINGTON, W. VA., DISTRICT                   1119
ately below Winfield locks is approximately 85 percent complete.
Dredging of channel at Tucker Branch and Big Hurricane Bar is
approximately 96 percent complete. The total cost from regular
funds under the existing project to the end of the fiscal year was
$6,709,452.85, of which $6,336,496.52 was for new work and $372,-
956.33 for maintenance. The expenditures were $6,656,808.13, of
which $6,293,537.30 was for new work and $363,270.83 for mainte-
nance.
   Public Works funds.-The twin locks at Winfield and Gallipolis
locks are complete. The Gallipolis Dam is approximatel: 95 percent
complete. The procurement of flowage easements in the pools of
completed Marmet and London locks, on nonnavigable tributaries
and main banks is approximately 90 percent complete. Construction
of five mooring cells at Gallipolis locks is approximately 64 percent
complete. The total cost of new work from Public Works funds to
the end of the fiscal year was $8,509,305.67. The expenditures were
$8,285,023.77.
   Emergency Relief funds.-Dredging of the channel in the upper
reaches of Winfield pool and the approaches to Winfield and Gal-
lipolis locks is complete. Construction of the Winfield Dam is ap-
proximately 99 percent complete. Construction of two dwellings at
Winfield locks is complete. Construction of extension to upper
guide wall at Gallipolis locks is complete. Construction of the op-
eration building and the installation of operating equipment and the
lock electrical system at Gallipolis locks is complete. Construction
of seven emergency bulkhead units for Gallipolis Dam is complete.
The total cost of new work from Emergency Relief funds to the
end of the fiscal year was $4,382,742.06. The expenditures were
$4,305,181.84.
   The total cost, all funds, under the existing project to the end of
the fiscal year was $19,601,500.58, of which $19,228,544.25 was for new
work and $372,956.33 for maintenance. The total expenditures were
$19,247,013.74, of which $18,883,742.91 was for new work and $363,-
270.83 for maintenance.
   In addition the sum of $5,159,879.10 was expended between July
1884 and June 30, 1936, on the operation and care of the works of
improvement under the provisions of the permanent indefinite appro-
priations for such purposes. The former expenditure was reduced
during the year by a cash receipt of $1.02.
                            PROPOSED OPERATIONS

  Regular funds.-The balance unexpended and accounts receivable
at the end of the fiscal year, together with an allotment of $2,618,000
made during July 1937, will be applied as follows:
Accounts payable June 30, 1937--------------------------------$56,     524.24
New work:
    Existing contracts:
        July 1-31, 1937:
            Complete dredging lower approach, Winfield locks___     8, 000. 00
            Complete dredging at Big Hurricane and Tucker
              Branch ---------------------         --              15, 500. 00
    Contract: July 16 to Aug. 31, 1937: Dredging Gallipolis pool
      (Knob Shoal) -------------------------------            _     5, 670. 00
     20196-37-pt. 1-71
1120       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New work-Continued.
    Hired labor and Government plant:
         Fiscal year 1938:
               Continue procurement of flowage easements, Winfield
                 and Gallipolis pools---------______------------            $2,502,960.00
              Complete removal of old works, Winfield and Galli-
                polis pools------------------------------------               119, 740. 00
         July 15 to Aug. 31, 1937: Clearing banks, Winfield and
           Gallipolis pools---------------------                                 2, 200. 00
         Aug. 1 to Aug. 31, 1937: Construct mooring posts, Win-
           field locks-----------------------------------                        1, 500.00
         July 16 to 31, 1937: Dredging Blaines Island, Winfield
           pool -----------------------------------                    ----      5,000.00
         July 1 to July 31, 1937: Repaint portion of lower gates,
           Lock "A", Winfield locks------------------------                      1,200.00
        Aug. 1 to Oct. 31, 1937: Raise and repair ice piers Galli-
           polis pool---           --------------------         ---------      13, 300.00
        Aug. 1 to Sept. 30, 1937: Repair and store spare gates,
           London, Marmet and Winfield locks-                                    5, 500. 00
        July 1 to Aug. 15, 1937: Dredge lower approach, Winfield
           locks ---------------------------------------                         6, 500. 00
        Fiscal year 1938:
              Prepare completion drawings, Marmet and London
                locks and dams                 ---------------------------       2, 000. 00
              Revise Kanawha River survey chart to conform to
                new pool lines             ----------------------------         1,100. 00
              Contingencies -------------------------------                    79, 327. 93
Operating and care:
   Hired labor and Government plant:
        Fiscal year 1938:
              Operations-----------------------------------                  150, 400. 00
              Ordinary repairs_ _ _ _                     _  _   ..   _ _       8, 000. 00
        Improvement and reconstruction: Fiscal year 1938:
          Dredging approaches to London, Marmet, and Winfield
          locks .------------                                                   4, 600. 00

             Total-------            ---------------------                 2,989,022. 17
  Public Works Administration Funds.-The balance unexpended
and accounts receivable at the end of the fiscal year will be applied
as follows:
Accounts payable June 30, 1937--------------------------------$242,                572. 81
New work:
    Existing contracts:
        July 1 to Aug. 31, 1937: Complete construction of roller
          gate dam at the Gallipolis locks and dam-------------               333, 4168, 64
        July 1 to 31, 1937: Construction of mooring cells, Galli-
          polis locks----------     ----------------------------              12, 100. 00
        July 1 to Aug. 31, 1937: Construction of esplanade and
          appurtenant work, Gallipolis locks-------------------                48,000.00
   Hired labor and Government plant:
        Fscal year 1938: Continue procurement of flowage ease-
          ments, London and Marmet Pools, Kanawha River------                 67, 690. 55
        July 1 to Aug. 31, 1937:
            Assisting navigation past construction site, Gallipolis
               locks and dam------------------------------------              12,176. 46
            Payment for gate struts, Gallipolis locks--------------            3, 470. 00
            Payment for tow haulage line guides, Gallipolis locks-_               350. 00
                Total-------------------
                       __--_---_                                             719, 776. 46
       RIVERS AND HARBORS-HUNTINGTON, W. VA., DISTRICT                                       1121
  Emergency Relief Administration funds.--The balance unex-
pended and accounts receivable at the end of the fiscal year will be
applied as follows:
Accounts payable June 30, 1937-----        ____ -_______-      -     _ $93, 662.43
New work :
   Existing contracts:
        July 1 to 31, 1937: Complete construction of roller gate
          dam at Winfield locks and dam--------------------115, 081.73
        July 1 to Aug. 31, 1937: Construction of esplanade and
          appurtenant work, Winfield locks------------------- 27, 700. 00
   Hired labor and Government plant :
        July 1 to Aug. 31, 1937:
            Payment for structural steel plates, spare lock gates,
              Winfield locks----------------------------------               50. 00
             Payment for needle storage brackets, Winfield locks ...        350. 00
        Fiscal year 1938: Reserve for claim for remission of liqui-
          dated damages deducted from the payments under con-
          tract for construction of operation building, Gallipolis
          locks -----------      -------------------------------         5, 350. 00
             Reserve for claim for remission of liquidated damages
               deducted from the payments under contract for
               construction of emergency bulkhead units, Galli-
               polls locks and dam---------------------                     860. 00

                      Total ------------                 ----------------------        243, 754. 16
  The additional sum of $1,168,300 can be profitably expended dur-
ing the fiscal year ending June 30, 1939, to be applied as follows:
New work :
   Contract :
        Dredging Marmet and Winfield pools------------------                           $85, 000. 00
        Construct dwellings, Gallipolis locks-------------------                        25, 000. 00
   Hired labor and Government plant: Continue procurement
      of flowage easements, Winfield and Gallipolis pools -___ .                       905, 600. 00
Operating and care of locks and dams:
    Operations-------------------------------------                                   115, 000. 00
   Ordinary repairs --------------------------------------                             11, 500. 00
   Improvement and reconstruction-------------------------                             16, 200.00
   Channel work----------------------------------------10,                                 000. 00
        Total-----------------------------------------                               , 1,   300. 00
                                   Cost and financial summary
                            MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937_
                                 1__1111                                    ___ $10, 631, 108. 77
Cost of maintenance to June 30, 1937-----                         --------------12 5, 532,835. 43
      Total cost of permanent work to June 30, 1937- --- ___ 16, 163, 944. 20
Undistributed costs June 30, 1937----------------------------         409. 19
      Net total cost to June 30, 1937--_----------__     ___
                                                         -___   16, 164, 353. 39
Plus accounts receivable June 30, 1937-------------------------       3, 470. 33
      Gross total costs to June 30, 1937-------    -    -________-16,
                                                               167, 823. 72
Minus accounts payable June 30, 1937-------------------------   56, 524. 24
     Net total expenditures_____________-...__.__--                             216, 111, 299.48
Unexpended balance June 30, 1937-----_ --..              ______        -________-    367, 551.84
       Total amount appropriated to June 30, 1937_-----__-                        216, 478, 851. 32
  1 Previous year's cost (permanent indefinite funds) reduced by $10.20.
  2 Includes $5,159,879.10 from permanent indefinite appropriation for operating and
care.
1122                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


   Fiscal year ending                      1933                1934                1935               1936
             June 30                                                                                                      1937


Cost of new work-......                $1, 610, 882.55    $1, 780, 966. 66       $56, 948. 53        $75, 311. 90        $434, 697. 33
Cost of maintenance.--                    230, 972.41        239, 551. 14        220, 147. 12        222, 075. 76         206, 794. 45

         Total cost.......              1, 841, 854.96     2, 020, 517. 80       277, 095. 65        297, 387. 66         641,491. 78
Total expended-.......                  1,929, 172. 56     2, 098, 563. 19       225, 038. 16        215, 221.37          600, 045. 03
Allotted............--------------..   3, 065, 068. 75       824, 177. 38        374, 924. 13        115, 654. 20         737, 011. 78


Balance unexpended July 1, 1936:
    Operating and care- --------- ___---__  $10, 987.20
    Maintenance and improvement--___---____ 219, 596.87
                                                                                                                     $230, 584.07
Amount allotted from War Department Appropria-
tion Act approved April 26, 1934_
Amount allotted from War Department Appropria-
tion Act approved April 9, 1935_ __--------   20, 000. 00
Amount allotted from War Department Appropria-
tion Act approved May 15, 1936--------------728, 000.00
                                                                                                                      748,000. 00
     Amount to be accounted for-    __---__ ---                                                                       978, 581. 07
Deductions on account of revocation of allotment                                                 _                     10, 988.22

      Net amount to be accounted for                                                                                  967, 595. 85
Gross amount expended --------------------                                             $624, 754.62
Less reimbursements collected--__------                                            - _   24, 710. 61
                                                                                                                      600, 044. 01
      Balance unexpended June 30, 1937_______--                                                                       367, 551.84
Outstanding liabilities June 30, 1937------------- $63, 251.18
Amount covered by uncompleted contracts--------     61,480. 89
                                                                                                                      124, 732. 07
     Balance available June 30, 1937_                                                                                 242, 819. 77
Accounts receivable June 30, 1937                                                 -                                     3, 470.33
     Unobligated balance available June 30, 1937___-      -_                                                          246, 290. 10
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937___--------------- -----------                                                           2, 618, 000.00
              Balance available for fiscal year 1938_______---                                               .-- 2, 864, 290. 10

Amount (estimated) required to be appropriated for completion
of existing project 3_________________________                                                                     1, 345, 600. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: 2- - - - - - - - - - -
                                      __ _____-      -
   For new work                                           __ -      -      - -
                                                                     ________                                       1, 015, 600. 00
   For maintenance3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                    -
                                                                                                                       152,700. 00
         Total -------------------                                 ----- --------------------                       1, 168, 300. 00
    a Exclusive of available funds.
                                                         PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937_------ -------------                                         __                 $8, 509, 305.67
Cost of maintenance to June 30, 1937

       Total cost of permanent work to June 30, 1937----------8,                                                      509, 305.67
Undistributed costs June 30, 1937-----                                                                                18, 290. 91
              Net total cost to June 30, 1937                          ------------------------                     8, 527, 596. 58
             RIVERS AND HARBORS--HUNTINGTON,                                                           W. VA., DISTRICT                             1123
Minus accounts payable June 30, 1937____        _____________                                                                         $242, 572. 81
     Net total expenditures----------------------------                                                                              8, 285,023. 77
Unexpended balance June 30, 1937-------     ---     ------                                                                              719, 776. 46
      Total amount appropriated to June 30,                                                  1.937-------------                      9, 004, 800. 23

    Fiscal year ending                     1933                          1934                   1935                  1936
             June 30                                                                                                                           1937


Cost of new work---------....             ----                     - $1, 882,464. 47       $4, 172, 622. 73       $1, 967, 013. 16           $487, 205. 31
Cost of maintenance_._
      Costofmaint-------                 ----        ---               ,   _,,,
                                                               ---------------- ----------------              ----------------
                                                                                                              I                       -   -------


                  .
Total expended--------- __...-.---                             -     1, 743, 021.02         3, 977, 201.46         2, 015, 962. 56            548, 838. 73
Allotted--------.............-- -----                      _         6, 169, 200.00         2, 606, 000. 00          229, 600. 23


Balance unexpended July 1, 1936___-------___                 ___-__ $1, 268, 615. 19
Gross amount expended__------------------          $1, 063,072.17
Less reimbursements collected -_-----------__          514, 233. 44
                                                                        548, 838. 73
      Balance unexpended June 30, 1937 -------------------              719, 776. 46
Outstanding liabilities June 30, 1937 ____- __- _$105,      738. 12
Amount covered by uncompleted contracts-------         614, 038. 34
                                                                        719, 776. 46

                                                     EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937-------- -------------                                                                         $4,382, 742. 06
Cost of maintenance to June 30, 1937-----------------                                                                           -------------
Total cost of permanent work to June 30, 1937---------------                                                                     4, 382, 742.06
Undistributed costs June 30, 1937_----______-------------13,                                                                             166. 21
      Net total cost to June 30, 1937___----                                                                                     4, 395,908.27
Plus accounts receivable June 30, 1937 -----------------------                                                                        2, 936.00
      Gross total costs to June 30, 1937      __-----------------                                                                4, 398, 844. 27
Minus accounts payable June 30, 1937 ------------------                                                                              93, 662. 43
      Net total expenditures _-------__               -__-     -- __                                                             4, 305, 181. 84
Unexpended balance June 30, 1937-------------------------                                                                           240, 818, 16
      Total amount appropriated to June 30, 1937------------                                                                     4, 546, 000. 00

   Fiscal year ending                     1933                           1934                  1935                   1936                    1937
         June 30

                     ---------
Cost of new work_____....          __----------$9,            267. 15   $2,088, 416. 87                                                   $2, 285, 058. 04
        maintenance___
Totalofexpmaiened-----------------
Cost                                     ------------------------------   87 0827
                                                                      ----------------                                                     2,88
Total expended..                _ _..   __..... ..             _._                     _1___________     _        1, 817, 082. 70          2, 488, 099.14
Allotted--------------...............   -------...........
                                                       -----------------                    5, 508, 000. 00        -962, 000.00


Balance unexpended July 1, 1936-------------------------              $2, 728, 917. 30
Gross amount expended_--- ---       ___--_______ $2, 495, 867. 68
Less:
    Reimbursements collected ------ $7, 654. 94
    Receipts from sales--        __-------- 113. 60
                                                           7,768. 54
                                                                       2, 488, 099. 14
      Balance unexpended June 30, 1937________________________            240, 818. 16
Outstanding liabilities June 30, 1937                     $4, 869. 36        ------------
Amount covered by uncompleted contracts--------          235, 948. 80
                                                                          240, 818. 16
      Balance available June 30, 1937
Accounts receivable June 30, 1937_----------_-___                                                                  _                       2, 936.00
      Unobligated balance available June 30, 1937                                                         ---------                        2, 936.00
1124                IREPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR KANAWHA RIVER,                                                W. VA.

Cost of new work to June 30, 1937                       ---------                   __           -_      $23, 523, 156. 50
Cost of maintenance to June 30, 1937                                                                    12 85, 532, 835. 43

      Total cost of permanent work to June 30, 1937------------29,                                               055, 991.93
Undistributed costs June 30, 1937--___---- ______--_____--_                                                       31, 866. 31

      Net total cost to June 30, 1937---------------------29,                                                    087, 858. 24
Plus accounts receivable June 30, 1937________                                                                        406. 33
                                                                                                                   6_______________,

      Gross total costs to June 30, 1937------------------                                                 29, 094, 264. 57
Minus accounts payable June 30, 1937______ ________-____-                                                      392, 759. 48

     Net total expenditures ________________________________                                              28, 701, 505. 09
Unexpended balance June 30, 1937_                                                                           , 328, 146. 46
                                                                                                           1------------------------

             Total amount appropriated to June 30, 1937                                      -           2 30, 029, 651. 55

   Fiscal year ending                  1933               1934               1935                1936                1937
            June 30

Cost of new work-..... $1,610, 882. 55                $3,663,431.13      $4,238, 838. 41    $4,130,741.93         $3,206, 960. 68
Cost of maintenance...    230, 972. 41                   239, 551. 14       220, 147. 12       149, 986. 01          206, 794. 45
         Total cost....... 1, 841, 854. 96             3, 902, 982. 27    4, 458, 985. 53    4, 280, 727. 94       3, 413, 755. 13

Total expended-_......              1,929,172. 56      3, 841, 584. 21    4, 202, 239. 62    4, 048, 266. 3        3, 636, 982. 90

Allotted--------------...........   3, 065, 068. 75    6, 993, 377. 38    8,488, 924. 13     -616, 745. 57           737, 011. 78


Balance unexpended July 1, 1936_ ----------------------                                          __       $4, 228,116. 56
Amount allotted from War Department Appro-
    priation Act approved Apr. 9, 1935_--_---                                        $20, 000. 00
Amount allotted from War Department Appro-
    priation Act approved May 15, 1936--------.                                      728, 000. 00
                                                                                                                 748, 000. 00

Amount to be accounted for _______-__            -_____ -_____-                                                4, 976, 116. 56
Deductions on account of revocation of allottment--------                                                          10, 988. 22

Net amount to be accounted for-__- ....        _____________                                                   4, 965, 128. 34
Gross amount expended __---         --
                                   __--    --    $4, 183, 694. 47
Less-
    Reimbursements collected --    $546, 598. 99
    Receipts from sales--------          113. 60
                                                     546, 712. 59
                                                                                                               3, 636, 981. 88

      Balance unexpended June 30, 1937______- ___________                                                      1, 328, 146.46
Outstanding liabilities June 30, 1937_________- $173, 858. 66
Amount covered by uncompleted contracts ----     911, 468. 03
                                                                                                               1, 085, 326. 69
     Balance available June 30, 1937--____----                              _____________                        242, 819. 77
Accounts receivable June 30, 1937--......                                                                          6, 406. 33

       Unobligated balance available June 30, 1937                                                               249, 226. 10
Allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-----------------------------------                                                      2, 618, 000. 00
             Balance available for fiscal year 1938----------------                                            2, 867, 226. 10
      Previous year's cost (permanent indefinite funds) reduced by $10.20.
    2 Includes $5,159,879.10 from permanent indefinite appropriation for operation and care.
    s Increased by $1,147.21, cost adjustment for previous years.
      RIVERS AND HARBORS-HUNTINGTON,                    W. VA., DISTRICT   1125
Amount (estimated) required to be appropriated for completion
                    4
  of existing    project '____      ___________---------------    $1, 345, 600. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1----------------------------------------          1, 015, 600. 00
   For maintenance ----------------------------------                 152, 700. 00

      Total     -----------------------------------------------    1, 168, 300. 00
   Exclusive of available funds.

7.BIG SANDY RIVER, W. VA. AND KY., INCLUDING LEVISA AND TUG
                           FORKS

    Location.-Big Sandy River, 27 miles in length, is formed by the
junction of the Levisa and Tug Forks at Louisa, Ky., flows in a
northerly direction, and empties into the Ohio River at Catlettsburg,
Ky. Levisa Fork, 160 miles in length, rises in southwestern Vir-
ginia and flows in a general northerly direction; and Tug Fork, 154
miles in length rises in southwestern West Virginia and flows in a
general northwesterly direction.
    Previous projects.-Adopted by River and Harbor Acts of July
18, 1878, June 14, 1880, and July 13, 1892. Total cost and expendi-
tures on original and modified projects were $380,431.16. (For fur-
ther details see Annual Report for 1915, p. 1929.)
   Existing project.-This provides for three locks and dams on the
main river, two locks and dams each on Levisa Fork and Tug Fork,
and regulating works below lock no. 1, reaching to the Ohio River.
Only the three locks and dams on the main river and the lower lock
and dam on each fork have been constructed. The existing improve-
ment gives a connection with pool formed by dam no. 29, Ohio River,
a slack-water depth of 6 feet from the Ohio River to Louisa, Ky., 27
miles, and thence to Cox Branch on Levisa Fork and to Bear Branch
on Tug Fork, 17.5 and 12.5 miles, respectively, above Louisa.
   The clearing of the forks above slack-water limits to Pikeville on
Levisa Fork and to Pond Creek on Tug Fork is also included in the
project.
   The estimate of cost for new work, revised in 1928, is $2,256,800.
The estimated cost of operation and care of the locks and dams, made
in 1936, is $33,000 annually.
   The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the construction
of lock and fixed dam near Louisa, Ky.; act of July 13, 1892, substi-
tuted a movable dam at lock near Louisa, Ky. (H. Doc. No. 25, 52d
Cong., 1st sess.) ; act of March 3, 1899, provided for construction of
two locks and dams on main stream (H. Doc. No. 456, 55th Cong.,
2d sess.); act of June 13, 1902, provided for removal of obstructions
and construction of one lock and movable dam each on Levisa and
Tug Forks, and raising crest of dam no. 3; act of March 3, 1905,
provided for regulating works at mouth of river; act of March 2,
1907, provided for the construction of a service bridge at dam no. 1;
and the act of June 25, 1910, provided for the construction of an
additional lock and dam each on Levisa and Tug Forks. Operation
and care of the locks and dams were included in the project July 1,
1935. under the Permanent Appropriations Repeal Act, approved
1126       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

June 26, 1934. (An index map of Big Sandy River and Levisa and
Tug Forks is printed in H. Doc. No. 235, 56th Cong., 2d sess.)
  The following table gives the characteristics of the locks and dams
included in this report:

                                       Lock


               Location           Dimensions                                                                          q
Lock                                                       "                                                          d
and                        S              ,
dam                                                                        Founda       Dam-Type                      0
no.                                .                       -               Ftion         of construc-
                                   .                                                         tion
       Nearest town                           8                 a                            tn          0




                          Miles   Feet    Feet     Feet    Feet
   1   Catlettsburg,       0.3    55.0    160.0    13.5     9.0            Sandstone-   Needle pass     1905   $319, 917.64
         Ky.                                                                             wicket weir.
  2    Buchanan, Ky_      12.9    55. 0   160. 0   12.6        6. 0   -- _do---... .... do-             1905       278, 893. 10
  3    Fort Gay, W.       26.6    52.0    158.0    10.6        7.8    ... do---------.... ... do1897               396, 304.98
         Va.
1L    Gallup, Ky....     35.4    55. 0   160.0    11.0        8.7                    ---....
                                                                      ___do------......     do     .... 1910       250,128.70
2L    Richardson,        45.4    55.0    160.0    12.0   ------.       do...-----...----..do---..---    (2)   3   545, 000.00
         Ky.
1T    3 miles above      31.0    55. 0   160. 0   12.0        7. 7        Piles    in .....do-------........
                                                                                                       1910   268, 452. 26
         Louisa, Ky.                                                         gravel.
2T    Webb, W. Va_.      40. 0   55. 0 --..... 12. 0                      Sandstone....do--......... (2) 3 507, 500. 00


               1 All movable dams.                  2   Not built.                        3 Estimated. 1928.


   Recommended modifications of project.--Recommendation was
made September 8, 1914, that the slack-water improvement of the
Tug and Levisa Forks be discontinued (H. Doc. No. 1159, 63d Cong.,
2d sess.).
   Terminal facilities.-Terminal facilities consist of two privately
owned terminals, one at Kenova, W. Va., and one at Leach, Ky. The
terminal facilities are considered adequate for existing commerce.
   Operations and results during fiscal year-Operating and care.-
The locks and dams were operated as required and necessary repairs
made thereto and to the appurtenant structures. Completed replace-
ment of miter sills and repairs to lock gates and valves, lock no. 1 and
installed used gasoline-driven capstan engines for operating the lock
gates, locks nos. 1 and 2. The cost during the fiscal year was $41,-
548.27, all for maintenance. The expenditures were $44,573.37, which
includes $285.17 from the permanent indefinite appropriation.
   Condition at end of fiscal year.-The locks and dams are in fair
condition. The 6-foot slack-water depth is available for about 7
miles above the mouth. For details of locks and dams see table
under paragraph "Existing project." Above this point the slack-
water depth is reduced to 4 feet. The total cost under the existing
project to the end of the fiscal year was $1,350,738.98, of which $1,-
205,804.92 was for new work and $144,934.06 for maintenance. The
expenditures were $1,349,047, of which $1,205,804.92 was for new
work and $143,242.08 for maintenance. In addition, the sum of
$1,002,207.73 was expended between January 1897, and June 30, 1937,
on the operation and care of the works of improvement under the pro-
visions of the permanent indefinite appropriation for such purposes.
          RIVERS AND HARBORS-HUNTINGTON, W. VA., DISTRICT                                                       1127
   Proposed operations.-The balance unexpended and accounts re-
ceivable at the end of the fiscal year, together with an allotment
of $24,400 made during July 1937, will be applied as follows:
Accounts payable June 30, 1937_-_______---__--------------          $1,759. 24
Operating and care (hired labor and Government plant):
    Operations, fiscal year 1938_______-- _-----------------------  22, 000. 00
    Ordinary repairs, fiscal year 1938--_--_-----------------------  2, 195. 70
    Improvement and reconstruction Sept. 1, 1937, to June 30, 1938,
      dredging channel immediately below lock 1_-- -_____----        1, 000. 00

                  Total----                                                                                    954. 94
                                                                                                           26-----------------------------
   The additional sum of $30,500 can be profitably expended during
the fiscal year ending June 30, 1939, to be applied as follows:
Operating and care of locks and dams:
    Operations-------------------------------------------------- $25,                                               000
    Ordinary repairs ----------------------------------------------     2,                                          500
    Improvement and reconstruction_      --         __-__ __        _--                                             500
    Channel work-------------------------------------------------2,                                                 500
                  Total----------------                         -------------------------                      30, 500
                                           Cost and financial summary
Cost of new work to June 30, 1937--------------------------                                     $1,586, 236. 08
Cost of maintenance to June 30, 1937____--
                                       -   _____ ____                                         _ 11, 147, 209. 05
      Total cost of permanent work to June 30, 1937-----------                                     2, 733, 445. 13
Minus accounts payable June 30, 1937-------------------------                                           1, 759. 24
     Net total expenditures _______________--______   ___     22, 731, 685. 89
Unexpended balance June 30, 1937__---- -1 1___1     11_______       2,554. 94
           Total amount appropriated to June 30, 1937__..                             .______ 12,734, 240. 83

          Fiscal year ending June 30                1933          1934           1935          1936             1937


Cost of new work    .    --------     -- -----------------                     $1,500.00 ............
                                                                .... .-----------------
Cost of maintenance__------------------ $26,192. 38 $17, 400. 73 $54,186. 07    39, 451. 24 $41, 548. 27
       Total cost----------- ------------         26, 192. 38   17, 400. 73    54, 186.07    40, 951. 24      41, 548. 27
Total expended--
               ....---------------------          22, 559. 34   17, 405. 40    48, 055.35    41, 161. 29      44, 573. 37
Allotted------.......-------------------          20, 152. 47   20, 842. 39   101, 000. 00    9, 172. 10      20, 492. 93


Balance unexpended July 1, 1936, operation and care___ $2, 059.50
Balance unexpended July 1, 1936, maintenance and im-
provement------------------- ------------------------ 24, 575. 88
                                                                                                       $26, 635. 38
Amount allotted from War Department Appropriation Act approved
May 15, 1936---------------------- --                                                                     22, 200. 00
      Amount to be accounted for---__  --------- ________     ____                                         48, 835. 38
Deductions on account of revocation of allotment-----------------                                           1,707. 07
      Net amount to be accounted for_-----------------------_                                              47, 128. 31
Gross amount expended, operation and care                        -------------
                                                              $285. 17
Gross amount expended, maintenance and improvement_ 44, 288. 20
                                                                                                           44, 573. 37

         Balance unexpended June 30, 1937-----------------____                                              2,554. 94
   1Includes $1,002,274.99 permanent indefinite appropriation.
   2 Includes $1,002,207.73 permanent indefinite appropriation.
1128          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937, operation and care - $67. 26
Outstanding liabilities June 30, 1937, maintenance and
improvement -------------------------------------- 1, 691.98
                                                                                                                  $1, 759. 24

         Balance available June 30, 1937_                              ___---------------------------                 795. 70

Unobligated balance available June 30, 1937 .------  __-----------     795. 70
Allotted from War Department Civil Appropriation Act, approved
July 19, 1937------------------------------------                 24, 400. 00

      Balance available for fiscal year 1938 ____ -_____--------25,     195. 70
Amount that can be profitably expended in fiscal year ending June
                              3 - - -- -
30, 1939, for maintenance ___________________ __________           30, 500. 00
SExclusive of available funds.
   8. EXAMINATIONS,                   SURVEYS, AND CONTINGENCIES                                       (GENERAL)

   The cost of maintenance during the fiscal year was $82,609.94. The
expenditures were $83,320.23.   The balance unexpended, including
accounts receivable at the end of the fiscal year, together with an
allotment of $21,300 made during July 1937, will be applied as needed
during the fiscal year 1938 to payment of expenses incurred under
this heading.
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1939.
                                       Cost and financial summary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937____--__------------------                                               $450, 884. 32

      Total cost of permanent work to June 30, 1937                                                           450, 884. 32
Plus accounts receivable June 30, 1937--------------------------                                                   900. 00

     Gross total costs to June 30, 1937__--  ______---------    -- 451, 784. 32
Minus accounts payable June 30, 1937---------------------------      1,316. 98

     Net total expenditures_---_                                                                              450, 467. 34
Unexpended balance June 30, 1937__----------------------                                                           817. 71

         Total amount appropriated to June. 30, 1937                            -----------------             451, 285. 05

        Fiscal year ending June 30                       1933           1934           1935           1936            1937


Cost of new work ...
Cost of maintenance.    ------------------         $36, 186. 83      $21, 829. 78   $22, 489. 56   $87, 050. 50     $82, 609. 94
Total expended...--__...__     .-----------   _ .27,      492. 43     23, 695. 66    22, 562. 90    88, 213. 59      83, 320. 23
Allotted...     __.... .______.__
                               ....... ______          38, 673. 11    18, 376. 94    39, 900. 00    98, 535. 00      50, 000. 00


Balance unexpended July 1, 1936--------------------------------                                               $34, 137.94
Amount allotted from War Department Appropriation
  Act approved Apr. 9, 1935_________________________                                      $20, 000. 00
Amount allotted from War Department Appropriation
Act approved May 15, 1936-------------------_   _                                         30, 000. 00
                                                                                                                  50, 000. 00
      Amount to be accounted for___ -___-________84,                                                                 137. 94
Gross amount expended --------- ______________-__                                        $88, 594. 05
Less reimbursements collected-----------_                                                  5, 273. 82
                                                                                                                  83, 320. 23

        Balance unexpended June 30, 1937-------                                 -      ________          _           817. 71
        RIVERS AND HARBORS-HUNTINGTON,                                      W. VA., DISTRICT                      1129
Outstanding liabilities June 30, 1937----------------------------                                          $1, 316. 98

     Balance available June 30, 1937---------------------------                                             -499.27
Accounts receivable June 30, 1937--------------------------------                                             900.00

     Unobligated balance available June 30, 1937---------------                                                  400. 73
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------- -------                                            21, 300. 00

       Balance available for fiscal year 1938----------------------                                        21, 700. 73
Amount that can be profitably      expended in fiscal year ending June
                              1- - - - - - - - - - - - - - - - - - - -- - - - - - - - -
  30. 1939, for maintenance                                                             -------            30, 000. 00
 'Exclusive of available funds.

        9. PLANT ALLOTMENT FOR HUNTINGTON, W. VA., DISTRICT
                                     Cost and financial summary
                                  ------------------------
Undistributed costs June 30, 19317_                              $900, 876.13
Plus accounts receivable June 30, 1937---------------------------60, 014. 19
      Gross total costs to June 30, 1937-------------------------                                        960, 890. 32
Minus accounts payable June 30, 1937----------------------                                                44, 587.66
     Net total expenditures----------------916,                    302. 66
Unexpended balance June 30, 1937------------------------------241, 922. 53
         Total amount appropriated to June 30, 1937---------------1,                                     158, 225. 19

         Fiscal year ending June 30                   1933           1934      1935              1936             1937


Total expended_------------------- ----------------------__                 $72, 620. 47 $853, 709. 43 -$10, 027. 24
Allotted_-----------------------.._...         _---------------97,              851. 61     840, 073. 58        220, 300. 00



Balance unexpended July 1, 1936-------------------------------                                           $11, 595. 29
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-------------         --  $8, 500. 00
Amount allotted from War Department Appropriation
  Act approved Apr. 9, 1935--------------------------20, 000. 00
Amount allotted from War Department Appropriation
  Act approved May 15, 1936------------------------_ 241, 800. 00
                                                                                                 -       270, 300. 00

      Amount to be accounted for----------------------------                                             281, 895. 29
Deductions on account of revocation of allotment-----------------                                         50, 000. 00
      Net amount to be accounted for_________________________        231, 895. 29
Gross amount expended----------------------------- $690, 170.29
Less-
    Reimbursements collected---------- $677, 772. 87
    Receipts from sales-----------------22, 424. 66
                                                     700, 197. 53
                                                               -----
                                                                  -10,     27. 24
      Balance unexpended June 30, 1937------------------------                                           241, 922. 53
Outstanding liabilities June 30, 1937-----------------$50, 201.71
Amount covered by uncompleted contracts------------ 206, 737.01
                                                                                                         256, 938. 72

      Balance available June 30, 1937-------------------------                                          -15,      016. 19
Accounts receivable June 30, 1937---------------------------6----                                              0, 014. 19
         Unobligated balance available June 30, 1937-------                               ----             44, 998.00
1130         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Status of reports called for by river and harbor acts and committee resolutions

                                                       Date trans-                  Recommen-
       Locality              Authorization act         mitted to     Document no.     dation
                                                        Congress

Greenbrier River and        Flood   Control Act,
  tributaries, W.    Va.     May 5, 1936.
  (preliminary examina-
tion for flood control).
Levisa Fork of Big          Flood   Control Act,
Sandy River in vicin-       June 25, 1936.
ity of Breaks of Sandy
 (preliminary examina-
tion for flood control).



IMPROVEMENT OF RIVERS AND HARBORS                                                   IN   THE
          CINCINNATI, OHIO, DISTRICT
   This district comprises the stretch of the Ohio River from about
mile 317.5 below Pittsburgh, which is just below the mouth of the
Big Sandy River, Ky., to about mile 556.2, just above Madison, Ind., a
distance of about 238.7 miles, and includes dams nos. 29 to 39, in-
clusive; also all work on the Kentucky River, Ky.
   District engineer: Lt. Col. C. L. Hall, Corps of Engineers, to
September 10, 1936, Maj. F. W. Gano, Corps of Engineers, acting
to October 10, 1936, and Lt. Col. D. O. Elliott, Corps of Engineers,
since that date.
   Division engineer: Col. R. G. Powell, Corps of Engineers.

                                              IMPROVEMENTS
                                               Page.                                     Page.
1. Locks and dams nos. 29-39,                           4. Kentucky River, Ky---------1130
     Ohio River --------------- 1051                    5. Examinations,   surveys and
2. Ohio   River open channel                                contingencies (general)----- 1134
     work------------------- 1051                       6. Plant allotment ------------- 1135
3. Flood control, Ohio River
     Basin   ------------------- 1051
  One to three, inclusive.           For reports on these improvements, see page 1051.

                                    4. KENTUCKY RIVER, KY.

   Location.-The Kentucky River is formed by the confluence of its
north and middle forks about 4 miles east of the town of Beattyville
in east central Kentucky, the south fork joining the main stream
at that place. (See U. S. Geological Survey chart for State of
Kentucky; scale, 1: 500,000.)
   Existing project.-The project provides for 14 locks and fixed
dams to give, in connection with the improvement of the Ohio River,
slack-water navigation of 6 feet minimum depth from the Ohio
River to points on the three forks a short distance above Beatty-
ville, Ky. The total length of pool water of 6-foot project depth
is about 263 miles. The river ordinarily rises to a height of 50 feet
in the lower part and 30 feet in the upper part. The extreme height
due to floods from Ohio River backwater exceeds 71 feet in lower
sections and occasional floods exceed 40 feet in the upper pools.
   The original estimate of cost, which contemplated the rehabilita-
tion of the State locks and dams and the extension of slack water
              RIVERS AND HARBORS-CINCINNATI,                                         OHIO, DISTRICT          1131
to the three forks at Beattyville, was $1,074,402, revised later to
$4,865,550 for its completion. The estimated cost of operation and
care of the locks and dams, made in 1936, is $172,500, annually.
   The existing project was adopted by the River and Harbor Act of
March 3, 1879, in accordance with the report published in House-
Document No. 47, Forty-fifth Congress, third session. Operation
and care of the locks and dams were included in the project July
1, 1935, under the provisions of the Permanent Appropriations
Repeal Act, approved June 26, 1934. No map of the river has been
published.
   The following statement shows the characteristics of the several
locks and dams in this project:

                                            Lock


              Location                 Dimensions

                                                                                                When
No.                                                Great-                  Depth                 corn-     Cost
                                                     est      Lift of       on        Founda-   pleted
                                  Miles            avail-     lock          ower        tion
                                   from wid         a                      miter
            Nearest town
                                  mouth width      length                   sill
                                                     (full
                                                   width
                                                   of lock)


                                           Feet     Feet       Feet         Feet
    11   Carrollton, Ky........     4. 0     38       145        8. 2        12. 8  Rock and
                                                                                      clay.
12       Lockport, Ky .......    31. 0       38       145       13.   9       6. 1 Rock...... 21882
13       Gest, Ky .          -. 42. O0
                        ....-----            38       145       13.   2       6. 5 ___do.......          $1,350,384.86
14       Frankfort, Ky .-...--   65.0        38       145       13.   2       7.4     do.
15       Tyronne, Ky _____
                         ..      82. 2       38       145       15.   O0      6. 4 ___do_...___1886
16       Versailles, Ky .....    96. 2       52       147       14.   0       6. 4 Rock and     1894       314, 846. 70
                                                                                      piles.
17       High Bridge, Ky ____    117. 0      52       147       15. 3         6. 9 Rock......   1897       290,768.44
18       Little Hickman, Ky__    139. 9      52       146       18. 7         6. 0 __do....._. 1900        275, 463. 14
49       Valley View, Ky- .... 157. 5        52       148       17. 3         6. 6 ___do.....- 1903        237, 645. 75
410      Ford, Ky----........... 176.4       52       148       17. 0         60 ___do...... 1904          221, 499. 58
411      College Hill, Ky-...... 201.0       52       148       18. 0         6. 0 ___do___....1906        296, 592, 95
612      Ravenna, Ky.........    220. 9      52       148       18. 0         6. 0 __do___.... 1910        425, 693. 33
S13      Willow, Ky_____...... 239. 9        52       148       18. 0         7. 0 ___do.._.... 1915       461, 475. 52
4 14     Heidelberg, Ky.......   249. 0      52       148       18. 0         7. 0 ___do....... 1917       392, 902. 06

     1 Fixed dam, crib construction.
     2 Date reconstruction was completed by United States.
    2 Built by the State of Kentucky.   Cost is given for repairs by United States only.
    4 Fixed dam, concrete construction.
    ' Fixed dam, concrete construction, movable crest.


   Terminal facilities.-For general merchandise and miscellaneous
freight practically no terminal facilities exist except a number of
small, poorly kept warehouses along the stream. At and near
Beattyville and Ravenna large tanks are located for the storage of
oil which was formerly shipped in barges by the river. Tanks for
receiving gasoline are located at Frankfort and Camp Nelson, Ky.
Eleven inclines for receiving coal, two chutes for delivering coal,
three inclines for receiving logs, one derrick for receiving sand and
gravel, one conveyor for shipping, and one crane for receiving quarry
stone, all small in character and mostly used intermittently only, are
located at various points on the river.
   Operations. and results during fiscal year.-The locks and dams
and necessary plant were maintained in satisfactory condition.
There were temporary interruptions to traffic caused by high water
1132    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and by bars and deposits formed in lock entrances during high-water
stages. The full project depth of 6 feet was not maintained during
extreme low-water periods in the upper ends of the pools of dams
nos. 12 and 13. These dams have movable A-frame crests which
increase the pool heights 2 feet, and the crests were not raised during
the year, as there was no navigation in those pools requiring the full
project depth in the channel.
   Sufficient dredging was done through bars in the channel and
deposit removed from lock chambers, entrances, and approaches to
permit the passage of commercial tows. The major items of main-
tenance of lock structures were the installation of lock gates at lock
no. 2, repairs to dams at locks nos. 4 and 8, construction of founda-
tion wall for lower training wall abutment at lock no. 10, and repairs
of valves at locks nos. 6 and 14.
   The total expenditures for the year were $152,176.45, which in-
cludes $14.88 from the permanent indefinite appropriation. The cost
of maintenance work was $155,079.45, which includes minus $1 from
the permanent indefinite appropriation.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1917 at a saving of $689,910 under the estimated cost. The
work accomplished under the project has been the rehabilitation of
the five old State locks and dams and the construction of new locks
and dams nos. 6 to 14, inclusive. The year of completion of the
various locks and dams is given in the table in the paragraph "Exist-
ing project."
   The condition of the works varies for the individual structures.
The limestone lock walls at locks nos. 1 to 8, inclusive, are in fair
condition but are deteriorating rapidly. Many of the face stones in
the walls have spalled considerably, and the mortar between the
stones is out in many places. The condition of the concrete-capped,
stone-filled timber-crib dams at locks nos. 1 to 8 vary from fair to
poor. The dams are settling in places, and some of the concrete caps
are cracked and considerably eroded. The concrete guide and guard
walls and piers at these locks are founded on old stone-filled timber
cribs and generally in poor condition. Due to deterioration of the
supporting cribs, most of these walls and piers are settling and lean-
ing, and some actual failures have occurred.
   The remaining locks and dams, nos. 9 to 14, inclusive, are of con-
crete construction and the masonry is generally in good condition.
Locks nos. 8 to 9 are difficult to operate on account of large leakages
through crevices and seams in the limestone foundations of the lock
walls.
   The condition of the lock gates, valves, and other appurtenances
varies from fair to poor. The channel is in fair condition. Though
the works are generally not in good condition, they are still in
operation.
   The total cost on this project to the end of the fiscal year from
the appropriation "Maintenance and improvement of existing river
and harbor works" is as follows: For new work, $4,176,749.05; for
maintenance, $122,261.52. The expenditures were $4,293,996.68. In
addition the sum of $6,405,371.78 was expended between July 5, 1884,
and June 30, 1937, on the operation and care of the works of im-
provement under the provisions of the permanent indefinite appro-
priation for such purposes.
              RIVERS AND HARBORS-CINCINNATI, OHIO, DISTRICT                                                     1133
  Proposed operations-Maintenance.-Operationand care of locks
and dams.
  The balance unexpended including accounts receivable on June
30, 1937, together with an allotment of $121,400 made during July
1937, will be applied as follows:
Accounts payable--------------------------------- -------------                                             $5, 235. 69
Services of permanent and temporary operating forces-----------                                             35, 090. 00
Fuel, electricity, and miscellaneous supplies-------------------                                            24, 917. 29
Ordinary repairs and maintenance of dwellings, grounds, locks,
  dams, buildings, machinery, plant, and tools-------------------                                            8, 540. 00
Improvement and reconstruction of lock walls, driveways, lock
  gates, and lock valves---------------------------------                                                   33, 506. 00
Dredging and snagging in pools_-----------------------------                                                16, 038. 66
Surveys of channels, lock structures, and boundaries of reserva-
  tions ------     -------------------                    ---------                                          9, 548.00

       Total           ----------------------------------------------                                  132,875.64
   The additional sum of $287,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
Operation of locks and dams and other works---------------------- $70, 000
Ordinary maintenance and repairs----------------------------                 25, 000
Improvement and reconstruction--------__-------               ------------- 150,000
Channel work ----------------------------                       -------      36, 000
Special work------------------------------------------------_                 6, 000

         Total               -------------------------------------------                               --     287, 000

                                      Cost and financial summary

Cost of new work to June 30, 1937_                         $4, 176, 749. 05
Cost of maintenance to June 30, 1937---------------------- 16, 527, 633.30

      Total cost of permanent work to June 30, 1937 --                                             0, 704, 382.35
                                                                                                  1-------
Undistributed costs June 30, 1937-_______________-----_                                                    221. 80
      Net total cost to June 30, 1937----------------------                 10, 704, 604. 15
Minus accounts payable June 30, 1937_____________--------------------------       5, 235. 69
     Net total expenditures   --------------------------- 10, 699, 368. 46
Unexpended balance June 30, 1937 ___ ________-_________        11, 475. 64
         Total amount appropriated to June 30, 1937-----------                                 110, 710, 844. 10

   Fiscal year ending June 30             1933            1934            1935             1936                 1937


Cost of new work-------_----------
Cost of maintenance.....------------. $177, 996. 64    $142, 773.04
                                                                         $1,110.00 -
                                                                       $144, 974.79
                                                                                              --------
                                                                                       -$27, 067. 47
                                                                                                  $155,079.45
      Total cost--..--------------     177, 996. 864    142, 773. 04    146, 084. 79    -27,067. 47            155.079. 45
Total expended-......--------------      62, 842. 83     84, 385.68     123,875.77      -18.863.23            152,176.45
Allotted---    ----------------          98, 615. 31     59, 780. 85    193, 610.00     -34, 676. 73           45, 272. 57


Balance unexpended July 1, 1936_- -------  ___-       -____-                                           $118, 379. 52
Amount allotted from War Department Appropriation
  Act approved April 9, 1935______  ______________ $1, 000. 00
Amount allotted from War Department Appropriation
  Act approved May 15, 1936--------___________ 44,400. 00
                                                                                                            45, 400. 00
Amount to be accounted for _--------__________                                                          163, 779. 52
1 Includes $6,405,371.78 from permanent indefinite appropriation.
1134           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Deductions on account of revocation of allotment                          -...     ____-                         $127.43

      Net amount to be accounted for-----..     ------            -                                         163, 652.09
Gross amount expended__---------------___--            $159,411.45
Less reimbursements collected------------------           7, 235.00
                                                                                                            152, 176. 45
      Balance unexpended June 30, 1937_________________--                                                      11, 475.-64
Outstanding liabilities June 30, 1937----------------$5,952.                                     96
Amount covered by uncompleted contracts
                                                                                                                5, 952. 96

      Balance available June 30, 1937-----------------------                                                    5, 522. 68
Amouint allotted from War Department Civil Appropriation Act
approved July 19, 1937__--__--------
                            _----------_---                                                                 121, 400. 00

     Balance available for fiscal year 1938 -------------------                                             126, 922. 68
Amount that can be profitably expended        in fiscal year ending
                                          -- - - -- -- -
June 30, 1939, for maintenance 2 _- _- -_287,                                                                    000. 00
   2
       Exclusive of available funds.

       5. EXAMINATIONS,                SURVEYS, AND CONTINGENCIES                                  (GENERAL)

  The cost of work during the year amounted to $103,469.35, the
expenditures were $88,530.87. The balance unexpended June 30,
1937, $14,103.06, together with an allotment of $33,000 made in July
1937, will be applied as needed during fiscal year 1938 to payment of
expenses to be incurred under this heading. The additional sum of
$50,000 can be profitably expended during the fiscal year ending
June 30, 1939.
                                       Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937------------------------$314,                                                 498. 68

     Total cost of permanent work to June 30, 1937_ ________314, 498. 68
Minus accounts payable June 30, 1937----------------------     5, 106.99

     Net total expenditures_________---------- ----                                                         309, 391.69
Unexpended balance June 30, 1937__---------------------                                      -------         14, 103. 06

          Total amount appropriated to June 30, 1937 -------                                              -__323, 494. 75

          Fiscal year ending June 30                1933          1934           1935              1936            1937


Cost of new work ..................... ....          -- .. --........
                                                                  -------     ---------          --- -- ------------..........
Cost of maintenance------- --        ---------- $27, 509. 16 $40, 341. 02     $25, 819. 88      $33, 121. 96    $103, 469. 35

Total expended....----------------------          28, 169. 85   39, 005. 10    29, 362. 99       41, 274. 28      88, 530. 87
Allotted.........----------------------------     28, 485. 01   33, 759. 74    49, 700. 00       37, 500. 00      82, 500. 00


Balance unexpended July 1, 1936_____________________________                                                $20, 133.93
Amount allotted from War Department Appropriation
   Act approved Apr. 9, 1935---------------------- $18, 500. 00
Amount allotted from War Department Appropriation
   Act approved May 15, 1936 ____________________                                    64, 000. 00
                                                                                                               82, 500. 00

          Amount to be accounted for---------------------------                                             102, 633. 93
              RIVERS AND HARBORS-CINCINNATI, OHIO, DISTRICT                                                               1135
Gross:amount expended----------------------------                                         $164, 909. 83
Less reimbursements collected--------------------                                           76, 378. 96
                                                                                                                 $88, 530. 87

      Balance unexpended June 30, 1937-------------------------                                                   14, 103. 06
Outstanding liabilities June 30, 1937-----------------------------                                                 5, 153. 53

     Balance available June 30, 1937-----------------------                                                        8, 949.53
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------                                                         33, 000. 00

            Balance available for fiscal year 1938__---------- -----                                              41, 949. 53

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1------------------------------------                                                  50, 000. 00
1Exclusive of available funds.
            6. PLANT ALLOTMENT FOR CINCINNATI, OHIO, DISTRICT
                                            Cost and financial summary

Undistributed costs June 39, 1937 ------                                   ---------------------    $917, 868. 50
Plus accounts receivable June 30, 1937-                                  ----------------       ----- 75, 585. 09

      Gross total costs to June 30, 1937----------------------                                                   993, 453. 59
Minus accounts payable June 30, 1937__--         --__----_-__-                                        --          99, 116. 66

     Net total expenditures_______-----------__-_                                                                894, 336. 93
Unexpended balance June 30, 1937 ___---____----...___._______                                                     43, 588. 30
         Total amount appropriated to June 30, 1937----_______-_                                                 937, 925. 23

   Fiscal year ending June 30                     1933                1934         1935            1936                 1937


Total expended____------------.........-------            ............          $534, 659. 18   $376.035. 87       -$16, 358. 12

Allotted_                 ----------------------------                           692, 460. 79    312, 571. 38          -67, 106. 94


Balance unexpended July 1, 1936__---------------------------   $94, 337. 12
Amount allotted from War Department Appropriation Act approved
May 15, 1936------------------------------------------------   50, 000.00

      Amount to be accounted for                                                                                       337.12
                                                                                                                 1---------------------
                                                                                                                 144,
Deductions on account of revocations of allotment---------------                                                 117, 106. 94

       Net amount to be accounted for_____----------------------                                                  27, 230. 18
Gross amount expended__ --------------.-------          $1, 155, 339. 02
Less--
    Reiinbursements collected                        -------
                                       $1, 115, 701. 89
    Receipts from sales_____________        55, 995. 25
                                                         1, 171, 697. 14
                                                                                                                -16,     358. 12
      Balance unexpended June 30, 1937--------------------___     43, 588.30
Outstanding liabilities June 30, 1937 ___---- _----- ---  -   __ 123, 418. 13
      Balance available June 30, 1937 ----------------------                                                    -79, 829. 83
Accounts receivable June 30, 1937------------------------------                                                    75, 585. 09

            Unobligated balance available June 30, 1937-------------                                             -- 4,244. 74




         20196-37-pt. 1-72
 1136         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Status of reports called for by river and harbor acts and committee resolutions

                                                         Date trans-
         Locality            Authorization act            mitted to         Document No.               Recommenda.
                                                          Congress

Little Miami River,       Flood Control Com-          ............    .......     ...     ........
   Ohio (flood control).     mittee resolution,
                             July 28, 1937.
Ohio and Mississippi      ..... do................---------.........--....--.............
  River, protection at
  Cincinnati, Ohio.
Ohio River, below Iron-   River and Harbor Act,        Aug. 4, 1937   ........---...----......--------------...
                                                                                                            Unfavorable.
  ton, Ohio, with a view     Aug. 30, 1935.
  to the construction of
  dam.
Tanners Creek, Dear-      River and Harbor Act, ...............
  born County, Ind.         Aug. 26, 1937.



IMPROVEMENT OF RIVERS AND HARBORS                                                                    IN       THE
           LOUISVILLE, KY., DISTRICT

   This district comprises that portion of the Ohio River between a
point 1.5 miles above Madison, Ind., and Cairo, Ill., including darns
nos. 41 (with Louisville and Portland Canal) to 54, the portions
of Indiana and Illinois within the watersheds of all streams flowing
into the Ohio River below a point 1.5 miles above Madison, Ind., and
those portions of Kentucky between the watersheds of the Kentucky
and Cumberland Rivers and between the watersheds of the Tennessee
and Mississippi Rivers.
  District engineers: Lt. Col. Gilbert Van B. Wilkes, Corps of En-
~ineers, to December 21., 1936, and Lt. Col. D. O. Elliott, Corps of
Engineers, since that date.
  Division engineer: Col. R. G. Powell, Corps of Engineers.
                                              IMPROVEMENTS

                                                 Page                                                             Page
1. Locks and dams nos. 41 and                       5. Tradewater River, Ky------- 1143
      43-53, Ohio River-_...  - --              1051 6. Examinations, surveys, and
2. Ohio    River,   open-channel                          contingencies (general)-... 1144
      work-------------------                   1051 7. Plant allotment-------------  1145
3. Green, Barren, and Nolin                          8. Wabash River Basin, Ind., and
      Rivers and Bear Creek, Ky_                1136      Ill., flood control--_----_ 1146
4. Rough River, Ky-----------                   1141
  1 and 2.     For reports on these improvements see page 1051.

3. GREEN, BARREN,                AND NOLIUN                RIVERS      AND BEAR                 CREEK, KY.

   Location.--Green River rises in Casey County, Ky., flows in a
northwesterly direction 370 miles, and empties into the Ohio River
about 8 miles above Evansville, Ind.
   Barren River rises in Monroe County, Ky., flows in a north-
westerly direction 130 miles, and empties into Green River one-half
mile above lock no. 4 and 149.5 miles above the mouth of Green
River.
  Bear Creek rises in Grayson County, Ky., flows in a southerly
direction 40 miles, and empties into Green River 0.3 mile above
new lock no. 5 and 168.4 miles above the mouth of Green River.
                   RIVERS AND HARBORS--LOUISVILLE,                           KY., DISTRICT                    1137
   Nolin River rises in Larue County, Ky., flows in a southwesterly
direction about 105 miles, and empties into the Green River 1.8 miles
above lock no. 6 and 183.5 miles above the mouth of Green River.
   Existing project.--This provides for the purchase of improve-
ments made prior to 1884 by the State of Kentucky, consisting of
locks and dams nos. 1 to 4, Green River, and no. 1, Barren River,
which gave a continuous 4-foot depth for navigation from Bowling
Green on the Barren River to the mouth of Green River; the recon-
struction of lock no. 2, Green River; the upstream extension of slack-
water navigation on Green River to Mammoth Cave, Ky., by the
construction of locks and dams nos. 5 and 6 and by the removal of
snags and slides; the construction of new locks at dam no. 1, Barren
River, and at dam no. 5, Green River; the raising of the crest of
dam no. 5, Green River, 2 feet, by means of a movable A-frame top;
the improvement of Nolin River by the removal of obstructive bars,
boulders, overhanging rocks, and snags; and the improvement of
Bear Creek by removing snags and widening the bends.
   The project for Green River extends from the mouth to Mammoth
Cave, Ky., a distance of 197.8 miles; for Barren River from the
mouth to Bowling Green, Ky., a distance of 30.1 miles; for Nolin
River from the mouth to Meredith Ferry, a distance of 73/4 miles;
and for Bear Creek, Ky., for a distance of 8 miles above its mouth.
The navigable depth in the improved portions is limited to 5 feet by
the elevations of the existing lock miter sills.
   Fluctuations in stage vary considerably at the different locks. At
lock no. 3, Green River, ordinary fluctuations due to high stages are
from 12 to 15 feet above the pool level, and at lock no. 1, Barren
River, from 7 to 10 feet above pool. The maximum stages of record
are 34 feet above normal pool stage at lock no. 3, Green River, and
29 feet at lock no. 1, Barren River. These stages were obtained
during the floods of 1937 and 1913, respectively.
   The principal data concerning the locks and dams are shown in the
following table:

                                        Location                      Greatestepth                            Depth
Lock and
                                                               Width   of lock   Lift at       on lower     on upper
   Lock
      and                                           Distance of lockvailable     normal        miter sill   miter sill
                             dam                     from     chamber  for full   pool        at normal
                                                                                              pool level    at normal
                                                                                                            pool level
                             Nearest town           mouth offull
                                                     river

                             GREEN RIVER
                                                        Miles     Feet     Feet     Feet         Feet          Feet
No. 1-...... At Spottsville, Ky....------------            9. 1    35. 5   139.0    1 11. 1         9.7           6. 7
             At Rumsey, Ky ....---------------
No. 2-----......                                          63.1     36. 0   141.0      14. 3         5. 5          7. 8
No. 3....... At Rochester, Ky_-------------              108. 5    35. 8   137. 5     17. 0         5. 6          7. 3
No. 4- ...   At Woodbury, Ky------------                 149.0     35. 8   138.0      16. 4         6.5           7.1
New no. 5_. 0.8 mile from Glenmore, Ky...                168. 1    56. 0   360. 0     15. 2         9. 3         12. 0
No. 6-...... 1.4 miles above Brownsville,                181. 7    36. 0   145. 0      9. 2         8. 8          8. 0
               Ky.
                            BARREN RIVER


No. 1.......
                                                    {     15. 0    36. 0   140. 0    15. 2          4. 7          7.3
                   Greencastle, Ky...............        164. 5    56.0    360.0     15. 2          9.3          12.0

  1 At normal pool, dam 48, Ohio River.
  9 From mouth of Green River.
1138           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


Lock and                                      Kind of                                    Year        Cost of
   dam            Character of foundation       dam          Type of construction         com-       lock and
                                                                                         pleted        dam

                        GREEN RIVER

No.   1-........Shale and coal.----.......----    Fixed._- Wood crib, concrete cap.._ 1835-40         $179,110.00
No.                                                         Wood crib-------------
      2.........Shale-.........-----------------..............do.....                        1895      295, 696. 00
No.   3.........Rock...-----------------            do........do     ....                  1833-36     121,377.00
No.   4---------     do---   ..-------------     ...do........do
                                                       3         -----------------
                                                                       ......              -1839       125, 718.00
No.   5          Piles and rock.._______.......__-- do. ___ Concrete masonry .
           -.......                                                                .1---------934  4 1;020, 867. 89
No.   6.         Gravel_ _          _------......__do-.... Wood crib, concrete cap--- 1905
                                               ...                                                     168, 415.00

                       BARREN RIVER

  1
No.            f Gravel..d---------------
             -{Piles                       -
                      in gravel----------}--
                                             do          -    do-                         1841
                                                                                          1934        871, 565.00

t With movable A-frame crest 3 feet high.
4 Includes $4,033.50 for purchase of land.
6 Includes $729,269 for new large lock completed in 1934, of which $1,800 was for purchase of land.


   The estimated cost of new work in Green and Barren Rivers,
revised in 1930, is $2,796,540; of new work in Nolin River, $15,000;
and of new work in Bear Creek, $23,000, of which $10,000 is to be
contributed by local interests; a total of $2,834,540.
   The estimated cost of the maintenance of the channel in Nolin
River, made in 1932, is $1,000 per annum, and in Bear Creek, made
in 1927, $500 per annum. The estimate of annual cost of operation
and care of the locks and dams, made in 1936, is $95,000.
   The existing project was authorized by the following acts: The
River and Harbor Act of August 11, 1888, provided for the purchase
of the original improvements (H. Ex. Doc. No. 111, 49th Cong.,
2d sess.) ; the Deficiency Act of March 3, 1893, provided for building
lock no. 2, Green River (Annual Report for 1891, p. 2439); the
River and Harbor Act of July 13, 1892, provided for the construc-
tion of lock no. 5, Green River, and the River and Harbor Act of
June 13, 1902, for the construction of lock no. 6, Green River (An-
nual Report for 1891, pp. 2478 and 2481). The River and Harbor
Act of March 3, 1905, contained an appropriation for $5,000 for con-
tinuing the improvement of Green River above the mouth of Big
Barren River, with the following proviso:
  That the Secretary of War may, in his discretion, expend such portion of
said amount as may be necessary for removal of snags in Nolin River.
   The River and Harbor Act of July 3, 1930, authorized the con-
struction of new locks at dam no. 5, Green River, and dam no. 1,
Barren River, the modification of dam no. 5, Green River, and the
widening of bends in Bear Creek, Ky. (Rivers and Harbors Com-
mittee Doc. No. 2, 71st Cong., 1st sess., and H. Doc. No. 685, 69th
Cong., 2d sess.).
   The River and Harbor Act of August 30, 1935, provided for the
improvement of Nolin River (H. Doc. No. 480, 72d Cong., 2d sess.).
   Operation and care of the locks and dams were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
   The latest-published map of the Green, Barren, and Rough Rivers
is printed in House Document No. 81, Seventy-third Congress, first
session, and of the lower 12 miles of Nolin River in House Document
No. 480, Seventy-second Congress, second session.
                      RIVERS AND* HARBORS-LOUISVILLE,                                       KY., DISTRICT                 1139
   Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that in connection with the improvement of Bear Creek,
Ky., local interests are to contribute $10,000 to the first cost of the
dredging, provide necessary rights-of-way at the bends, furnish with-
out cost to the United States satisfactory areas for the disposal of
excavated material, and assume all flowage damages along Bear Creek.
These conditions have not been met.
   The River and Harbor Act of August 30, 1935, provides that local
interests provide any land or easements required for the purpose of
the improvement of Nolin River.
    Terminal facilities.-On the lower part of Green River four ter-
minals are used for loading coal, two for transferring asphalt from
barge to rail, one terminal for receiving logs, and two used for repair
of boats and barges. On the upper part of Green River and on Bear
Creek and Nolin River (tributaries of Green River) there are three
terminals for loading asphalt. Terminals on Barren River are at
Bowling Green, Ky., and consist of two terminals for transfer of
asphalt from barge to railroad, one sand and gravel receiving point,
and two paved wharves. One of the wharves is open to the public.
At various points along Green and Barren Rivers there are also
about 50 privately controlled unimproved landings. These facilities
are adequate for existing commerce. (See H. Doc. No. 81, 73d Cong.,
1st sess., for a description of the terminals.)
    Operations and results during fiscal year.-New work during the
year consisted of clearing the channel in Nolin River of snags, slides,
and overhanging trees by hired labor at a cost of $3,601.76 and settle-
ment of contractor's claims for work in previous years on Green and
Barren Rivers at a cost of $29,934.38, a total of $33,536.14. Mainte-
nance consisted of the maintenance and operation of the seven dams
in Green and Barren Rivers at a cost of $67,782.81 and removal of
obstructions from the channel in the improved portion of these rivers
at a cost of $22,003.68, a total of $89,786.49. The combined cost of
new work and maintenance was $123,322.63. The expenditures were
$132,408.65. All work was done with regular funds.
   Condition at end of fiscal year.-The canalization system on the
Green and Barren Rivers is in only fair condition except for lock
no. 1, Barren River, and lock and dam no. 5, Green River, which are
new. The controlling navigable depth in the sections covered by the
existing project was 5 feet at the end of the fiscal year. The new
work on the Green and Barren Rivers was completed in 1934. The
new work remaining to be done to complete the project consists of
the completion of the improvements in the Nolin River provided for
by the River and Harbor Act of August 30, 1935, and the improve-
ments in Bear Creek provided for by the River and Harbor Act
of July 3, 1930.
   The costs to the end of the fiscal year were as follows:
                                                                                                              Public     Emer.
                                                                                           Regular funds      Works      gency
                                                                                                              funds      Relief
                                                                                                                         funds

New work........-----------------------------
                          ............................................                     $2, 353, 199. 12   $85, 000 .....
lMaintenance ...---      _ _---._-__---_ _- .._...-----_-_ _-- ____                            23,063. 95 ---------            $2, 000
Operating and care of locks and dams.......------------------_ .. _                           122, 448.08
          Total--               . .
                            ----------.-.-.---
                                          .    .            .            .- .   ..   -..    2, 498, 711.15     85, 000          2, 000
1140          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The total expenditures were $2,584,927.81, including $85,000 Public
Works funds and $2,000 Emergency Relief funds.
   In addition, the sum of $3,842,667.40 was expended between 1888
and June 30, 1936, on the operating and care of the works of im-
provement, under the provision of the permanent indefinite appro-
priation for such purposes.
   Proposed operations---Regular funds.-The balance unexpended,
including accounts receivable on June 30, 1937, together with an
allotment of $57,000 made in July 1937, will be applied as follows:
Accounts payable June 30, 1937-------------------------------------         $864. 36
Maintenance: Clearing channel in pools (hired labor July 1, 1937,
  to Dec 31, 1937) ----------------------------------------------         20, 000. 00
Maintenance (operating and care) :
    Operation (hired labor July 1, 1937, to June 30, 1938) _ $25, 300. 00
    Ordinary repairs (hired labor July 1, 1937, to June
      30, 1938) ---------------------- -----------            10, 461. 23
    Improvement and reconstruction (hired labor July 1,
      1937, to June 30, 1938) --------------------------       7, 900. 00
                                                                          43, 661.23

            Total for all work--------------------------------------                            64, 525. 59
  The additional sum of $405,500 can be profitably expended during
the fiscal year 1939, as follows:
Maintence: Channel dredging in pools (hired labor July 1, 1938, to
June 30, 1939)                            ----------------------------        $50, 000
Maintenance (operating and care) :
   Operation (hired labor July 1, 1938, to June 30, 1939)___ $27, 000
   Ordinary repairs (hired labor July 1, 1938, to June 30,
      1939) ----------------------------------------------- 12, 000
   Improvement and reconstruction (hired labor July 1, 1938,
      to June 30, 1939)__--____------- --- _              __-_____ 313, 000
Emergencies (hired labor July 1, 1938, to June 30, 1939)-....           3, 500
                                                                               355, 500
         Total for all work------------------------------------------405, 500

                                   Cost and financial summary
Cost of new work to June 30, 1937__------------______________ $2, 438, 199. 12
Cost of maintenance to June 30, 1937---_________________      13, 990, 179. 43
      Total cost of permanent work to June 30, 1937----------                               6, 428, 378. 55
Undistributed costs June 30, 1937_--------------------------_                                        81. 02
      Net total cost to June 30, 1937_________________ _____                                6, 428, 459. 57
Minus accounts payable June 30, 1937                                                               8_________________
                                                                                                    864. 36
     Net total expenditures________________-________          1 6, 427, 595. 21
Unexpended balance June 30, 1937 ---       __________________        7, 525. 59
         Total amount appropriated to June 30, 1937------------ 16, 435, 120. 80

  Fiscalyear nding          1933                1934            1935          1936                1937


Cost of new work....      $190, 163. 41    $1, 299, 305. 84   $222, 136. 69   $2, 284. 14         $33, 536. 14
Cost of maintenance_.      103, 934. 55         72, 549. 98     74, 825. 79   59, 405. 53          89, 786. 49
      Total cost......     294, 097. 96     1, 371, 855. 82    296, 962. 48   61, 689. 67         123, 322. 63
Total expended-.......     243, 962. 23     1, 365, 018. 62    323, 148. 73   66, 684. 19         132, 408. 65
Allotted-.........___    1, 639, 881. 31       128, 872. 33    243, 000. 00   87, 960. 46           2, 506. 83

   1Includes    $3,842,667.40 from the permanent indefinite appropriation.
              RIVERS AND HARBORS-LOUISVILLE,                                      KY., DISTRICT             1141
Balance unexpended July 1, 1936 -------------------       ----- $137,427.41
Amount allotted from War Department Appropriation
Act approved May 15, 1936_------------------------- $2, 500.00
Amount allotted from Emergency Relief and Construc-
tion Act approved July 21, 1932---------------------      7.74
                                                                   2, 507. 74

      Amount to be accounted for------------------------------                                        139, 935. 15
Deductions on account of revocation of allotment----------------                                              .91

       Net amount to be accounted for-------------------------                                        139, 934. 24
Gross amount expended-----------------------           $133, 655. 99
Less :
    Reimbursements collected ------------- $1, 010. 84
    Receipts from sales-------------------     236. 50
                                                                              -        1, 247. 34
                                                                                                      132, 408. 65

      Balance unexpended June 30, 1937 ---------------------                                            7, 525. 59
Outstanding liabilities June 30, 1937-----------------------------                                         864. 36

     Balance available June 30, 1937---------------- ---                                                6, 661. 23
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_ _---------------------------------------                                      57, 000.00

     Balance available for fiscal year 1938---------------- ----                                       63, 661. 23
Amount (estimated) required to be appropriated for completion of
   existing      project 2 3-----------------                                                          24, 400. 00
Amount that can be profitably      expended in fiscal year ending June
                               - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1939, for maintenance 3                                                                          405, 500. 00
2Exclusive of $10,000 to be contributed.
  sExclusive     of available funds.

                                                4. ROUGH RIVER, KY.

   Location.-This stream is one of the principal tributaries of Green
River and lies wholly within the State of Kentucky. It rises in
Hardin County, flows westerly 136 miles, and empties into Green
River at Livermore, 71 miles from the mouth of that river. (See
U. S. Geological Survey Charts, Kentucky Quadrangles: Central
City, Hartford, Whitesville.)
   Existing project.-This provides for clearing the river of obstruc-
tions and for the construction of a lock and dam to carry slack water
to Hartford, Ky. The new work provided for having been com-
pleted, the project now contemplates the maintenance of the lock and
dam and keeping the river channel free from snags and other ob-
structions to navigation.
   At the lock the ordinary fluctuations due to floods vary from 6 to
10 feet above pool level. During the flood of 1937 a stage of about
26 feet above pool stage was reached.
   The location and principal dimensions, etc., of the lock are as
follows:
Name: Lock no. 1, Rough River.
Nearest town, Livermore, Ky-------------------------------miles__                                               8
Mouth of Rough River, in Green River, Ky_--------------------do                                                 8
Width of lock chamber---------------------------------------feet                                               27
Greatest length available for full width----------------------- do.                                        125.1
Lift at pool stage---------------------------   -----------------------
                                                                   do                                        9. 4
Depth on lower miter sill at pool stage--- -        -__-_          do.                                       4. 9
Depth on upper miter sill at pool stage--
                                        ....--        ____ -       do.                                       6. 8
Character of foundation: Rock.
Kind of dam: Fixed.
1142     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Type of dam: Wooden, stone-filled crib, stepped.
Cost of lock and dam: $72,186.35.
Year opened to navigation: 1896.
  The original estimate for building the proposed lock and dam and
removing obstructions from the river amounted to $56,729.80 (Report
for 1885, p. 1901). The project and estimate were subsequently
modified (Reports for 1891, p. 2447, and 1896, p. 2280), changing the
dimensions of the structures and substituting a concrete lock and
abutment for the masonry lock and timber abutment originally pro-
posed. The revised estimate under which the work was undertaken
was as follows:
Cost of lock and dam, etc., complete-----------------------------$96, 556. 05
Clearing banks and channel _____--________------_9,                      000.00
       Total_---__-----------------------------------------------    105, 556. 05
  The estimate of annual cost of operation and care of the lock and
dam, made in 1936, is $1,600.
   The existing project was adopted by the River and Harbor Act of
September 19, 1890, in accordance with the report published in the
Annual Report for 1885, page 1894. Operation and care of the lock
and dam were included in the project July 1, 1935, under the pro-
visions of the Permanent Appropriations Repeal Act approved June
26, 1934. The latest published map of Rough River is printed in
House Document No. 81, Seventy-third Congress, first session.
   Terminal facilities.-There are no terminal facilities except a few
unimproved private landings. The facilities are adequate for the
existing commerce.
   Operations and results during fiscal year.-The work during the
year consisted of the maintenance and operation of the lock and
dam.     The costs were $1,841.45.      The total expenditures were
$1,952.48, all from regular funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1899. At the end of the year the lock and dam were in
fair condition and a slackwater channel was available from the mouth
to Hartford, Ky., for boats not exceeding 4-foot draft.
   The costs to the end of the fiscal year were $105,500 for new work
and $8,635.57 for operating and care, a total of $114,135.57. The
expenditures were $114,142.18.
   In addition, the sum of $55,298.39 was expended between 1898
and June 30, 1936, on the operating and care of the works of im-
provement, under the provision of the permanent indefinite appro-
priation fQr such purposes.
   Proposed operations--Reular funds.-The balance unexpended,
including accounts receivable on June 30, 1937, and an allotment
of $1,350 made during July 1937, will be applied as follows:
Maintenance (operating and care) :
   Operation (hired labor, July 1, 1937, to June 30, 1938) .------    $1, 350. 00
   Ordinary repairs (hired labor, July 1, 1937, to June 30, 1938)           7. 82

       Total for all work----------------------------------------      1, 357. 82
  The additional sum of $3,975 can be profitably expended daring
the fiscal year 1939, as follows:
                 RIVERS AND HARBORS--LOUISVILLE,                                         KY., DISTRICT                  1143
Maintenance (operating and care by hired labor) :
   Operation--------------------------------------------------                                                         $1, 400
   Ordinary repairs-----------------------------------                                                                      75
   Improvement and reconstruction ----                 ------------- ----                                               2, 500
            Total for all work                          __         ______                              -------           3, 975

                                               Cost and financial summary
Cost of new work to June 30, 1937---------------------------- $105, 500. 00
Cost of maintenance to June 30, 1937____---------------------6 163, 933. 96

      Total cost of permanent work to June 30, 1937                                                             169, 433. 96
Undistributed costs June 30, 1937_____---------------------------                                                      6. 61

            Net total cost to June 30, 1937____--__---------------------                                        169, 440. 57

Net total expenditures ----- --------------------------------                                                  1169, 440. 57
Unexpended balance June 30, 1937 ___.- -      -
                                            ________-------                                                            7. 82

            Total amount appropriated to June .0, 1937---------------                                          1169, 448. 39

           Fiscal year ending June 30                            1933         1934'        1935         1936            1937

Cost of new work---------------------------------------------------------                                                      -
Cost of maintenance----------------------$1,132.11                          $1,025.48    $1,371.22    $6,794.12        $1,841.45
Total expended-------------------------                        1, 202. 53   1, 043. 18    1,218. 20    6, 864. 72       1, 952. 48
Allotted------------------------------_881. 76                               1,034. 40    7,200. 00    2, 000. 00         650.00


Balance unexpended July 1, 1936_____________________________---                                                     $1, 310. 30
Amount allotted from War Department Appropriation Act approved
  May 15, 1936                                                                                                          50. 00
                                                                                                                       6-----------------------

      Amount to be accounted for___----------------                                                                 1, 960. 30
Gross amount expended ___________    _______      ____-____                                             -           1, 952. 48
     Balance unexpended June 30, 1937____          _ -____------7.                                                             82
Amount allotted from War Department Appropriation Act approved
July 19, 1937-------------------------------------------------                                                      1, 350. 00
           Balance available for fiscal year 1938__
                                                  ---                                    ________---                 1, 357. 82
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 2-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                         3, 975.00
   1 Includes $55,298.39 from the permanent indefinite appropriation.
    2 Exclusive of available funds.

                                          5. TRADEWATER RIVER, KY.

   Location.-This river is a tributary of the Ohio River lying wholly
within the State of Kentucky. It rises in Christian County, flows
in a northwesterly direction, and empties into the Ohio River, near
Caseyville, Ky., at a point 104 miles from the mouth and 77 miles
below Evansville, Ind. (See U. S. Geological Survey, Kentucky
quadrangles: Shawneetown,       Morganfield,   Providence, Dawson
Springs, Princeton, and Cave in Rock.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3. 1881. The total costs and expenditures were $17,568.48.
 (For further details see Annual Report for 1899, p. 445.)
   Existing project.-This provides for a channel 9 feet deep at pool
stage from the mouth of the Tradewater River to the tipple of the
1144          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Bell Coal & Navigation Co., a distance of 3 miles, at an estimated
cost of $2,500, with $500 annually for maintenance.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (Rivers and Harbors Committee Doc. No. 5, 70th Cong.,
1st sess.). An index map of the river is published in House Docu-
ment No. 39, Sixty-third Congress, first session, and the latest pub-
lished map is in House Document No. 479, Seventy-first Congress,
second session.
   Terminal facilities.-There is a coal tipple at a point 3 miles above
the mouth. This is adequate for existing commerce.
   Operations and results during fiscal year.-Work during the year
consisted of clearing the channel of snags and slides, and the banks
of overhanging trees and stumps. The total costs and expenditures
during the fiscal year were $4,732.52, for maintenance, all from regu-
lar funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The project depth of 9 feet is available in the im-
proved channel. The costs to the end of the fiscal year were $2,500
for new work and $4,732.52 for maintenance, a total of $7,232.52.
The total expenditures were $7,232.52.
   Proposed operations.-The unexpended balance of $267.48 will be
applied to the removal of obstructions from the channel.
   The additional sum of $500 can be profitably expended during the
fiscal year 1939 for the removal of obstructions from the channel.
                                        Cost and financial summary
Cost of new work to June 30, 1937------------------------------    $18, 568. 48
Cost of maintenance to June 30, 1937------------------------------   6, 232. 52
          Total cost of permanent work to June 30, 1937_----------- 24, 801. 00

Net total expenditures_________________________                    24, 801. 00
Unexpended balance June 30, 1937---------- ---------------- ------     267. 48
          Total amount appropriated to June 30, 1937----------------                                       25, 068.48

               Fiscal year ending June 30                             1933    1934      1935        1936        1937


Cost of new wor .--------     -------------                                  ---
Cost of maintenance----------          ------------------------                                               $4,732. 52

Total expended--------------------------------------        -------                ------------------ 4,732.52
Allotted---------------------------------------------......                                                -5,000.00

Amount alloted from War Department Appropriation Act approved
May 15, 1936------------------------------------------------ $5,000.00
Gross amount expended__                         -------------------------                _    __          4,732. 52

          Balance unexpended June 30, 1937-------------------------                                           267. 48

Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance 1                      ---------------                                           500. 00
    1Exclusive of available funds.

      6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The costs of the work during the year amounted to $98,253.04; the
expenditures were $92,330.11. The unexpended balance of $12,388.42,
               RIVERS AND HARBORS-LOUISVILLE, KY., DISTRICT                                                              1145
plus an allotment of $36,500 made in July 1937, will be applied during
the fiscal year 1938 to the payment of expenses incurred under this
heading. The additional sum of $26,700 can be profitably expended
during the fiscal year 1939.
                                        Cost and financial summary

Cost of new work to June 30, 1937-----------------    -------                                              -----------
Cost of maintenance to June 30, 1937------------------------                                                $386, 717.19

           Total cost of permanent work to June 30, 1937---------------                                          386, 717. 19
Undistributed costs to June 30, 1937---------------------                                                            -27.       15

      Net total cost to June 30, 1937-----------------------------                                               386, 690. 04
Minus accounts payable June 30, 1937------------------------                                                       4, 419. 15

     Net total expenditures ___-------                                                      ---                 382, 270. 89
Unexpended balance June 30, 1937_--                                ----                             -            12, 388. 42

           Total amount appropriated to June 30, 1937----------------394, 659. 31

           Fiscal year ending June 30                  1933               1934       1935               1936             1937

Cost of new work-----------         ---------    -------------------------------------------
Cost of maintenance.....------------------- $30,801. 86 $25, 029. 92 $48, 937. 85                 $58, 909. 98       $98, 253. 04
Total expended.------------------------36, 650. 49                   24, 510. 79   48, 985. 92     61, 005. 75          92, 330. 11
Allotted       -
             -----------------------------           39, 717. 96     29, 219. 81   73, 400. 00     55, 000. 00          77, 000. 00


Balance unexpended July 1, 1936-                -------------- $------------
                                                                   718.53                                        $27,
Amount allotted from War Department Appropriation Act approved
May 15, 1936------------------------------------------------ 77, 000. 00
      Amount to be accounted for------------------------------104, 718. 53
Gross amount expended------------------------------ $96, 393. 60
Less reimbursements collected--------------------                                             4, 063. 49
                                                                                                                  92, 330. 11
      Balance unexpended June 30, 1937------------------------                                                    12, 388. 42
Outstanding liabilities June 30, 1937----___
                                           ------- -----       -                                                   4, 419. 15
     Balance available June 30, 1937----------------------------                                                   7, 969. 27
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------------                                                    36. 500. 00
      Balance available for fiscal year 1938---------------------- 44, 469. 27
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26, 700. 00
1Exclusive of available funds.

             7. PLANT ALLOTMENT FOR LOUISVILLE, KY., DISTRICT

                                        Cost and financial summary
Undistributed costs June 30, 1937--------------------------- $2, 478, 449. 38
Plus accounts receivable June 30, 1937------------------------    40, 524. 99
     Gross total costs to June 30, 1937---------------------                                               2, 518, 974. 37
Minus accounts payable June 30, 1937------------------------                                                  158, 892. 23
     Net total expenditures ----------------------          -                                              2 360, 082. 14
Unexpended balance June 30, 1937---------------------------                                                  238, 294. 51
           Total amount appropriated to June 30, 1937-----__                                                   2, 598, 376. 65
1146          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937




Balance unexpended July 1, 1936-------------------------                     $509, 739. 79
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936--------------  ------------------                       181, 301. 30

     Amount to be accounted for_____--   ________-------------_               691, 041.09
Deductions on account of revocation of allotment-----------                    20, 000. 00

      Net amount to be accounted for                 _----_--------------     671, 041. 09
Gross amount expended___-------------                 - $2, 037, 117.12
Less:
    Reimbursements collected -        $1, 578, 888. 65
    Receipts from sales ----------         25, 481. 89
                                                           1, 604, 370. 54
                                                                             4~2
                                                                             TJG,
                                                                                  74f.V   5
      Balance unexpended June 30, 1937________________-___    238, 294. 51
Outstanding liabilities June 30, 1937 _______________________266, 201.16

     Balance available June 30, 1937-----------              __---27,             906. 65
Accounts receivable June 30, 1937_______        _______________               40, 524.99

       Unobligated balance available June 30, 1937________----                12, 618. 34

     8. WABASH RIVER BASIN, IND. AND ILL., FLOOD CONTROL

   Location.-The works covered by this project are a series of levees,
flood walls, channel improvements, drainage improvements, bridge
reconstruction, and other works on the Wabash River Basin, Ill. and
Ind.
   Existing project.-This provides for the construction of flood-con-
trol works on the Wabash River and its tributaries, authorized by
the Flood Control Act approved June 22, 1936, as follows:
   Indianapolis, Warfleigh section, on West Fork of White River, Ind.: Levees,
bridge reconstruction, channel improvement, and appurtenant works to protect
people and city property; House Document No. 100, Seventy-third Congress,
first session; estimated construction cost $1,020,000, estimated cost of lands
and damages $400,000.
   Indianapolis, Fall Creek section, on West Fork of White River, Ind.: Levees,
flood wall, bridge reconstruction, channel improvements, and appurtenant
works to protect people and city property; House Document No. 100, Seventy-
third Congress, first session; estimated construction cost, $540,000,1 estimated
cost of lands and damages, $798,000.
   Wabash, on Wabash River, Ind.: Levees, bridge reconstruction, channel im-
provement, and appurtenant works to protect people and city property; House
Document No. 100, Seventy-third Congress, first session; estimated construc-
tion cost, $205,000; estimated cost of lands and damages, $355,000.
   Peru, on -Wabash River, Ind.: Levees, flood wall, bridge reconstruction, and
appurtenant works to protect people and city property; House Document No.
100, Seventy-third Congress, first session; estimated construction cost, $1,-
720,000; estimated cost of lands and damages, $780,000.
   Logansport, on Wabash River, Ind.: Construction of remedial works consist-
ing of intercepting sewers and appurtenances to provide flood relief; estimated
construction cost, $612,000.

  'Estimate   may have to be increased to meet desires of local interests for more com-
plete protection.
           RIVERS AND HARBORS--LOUISVILLE,                    KY., DISTRICT          1147

    Anderson, on West Fork of White River, Ind.: Levees, flood wall, bridge recon-
struction, drainage improvements, and appurtenant works to protect people
and city property; House Document No. 100, Seventy-third Congress, first
session; estimated construction cost, $127,000; estimated cost of lands and
damages, $258,000.
    Muncie, on West Fork of White River, Ind.: Levees, flood wall, channel im-
                                                                              and
provement, bridge reconstruction, and appurtenant works to protect people
city property; House Document No. 100, Seventy-third Congress, first session;
estimated construction cost, $840,000; 1 estimated cost of lands and damages,
$660,000.
    Shoals, on East Fork of White River, Ind.: Levees and appurtenant works
to protect people and city property; House Document No. 100, Seventy-third
Congress, first session; estimated construction cost, $127,000; estimated cost
of lands and damages, $65,000.
    Terre Haute, on Wabash River, Ind.: Levees and appurtenant works to
protect people and city property; House Document No. 100, Seventy-third Con-
gress, first session; estimated construction cost, $37,500; estimated cost of
lands and damages, $2,500.
    Lyford levee unit, mile 227.5 to mile 234.7 above mouth of Wabash River,
Ind.: Raising and improving existing levees to increase protection for agricul-
tural area; House Document No. 100, Seventy-third Congress, first session;
estimated construction cost, $84,650; 1 estimated cost of lands and damages,
 $23,350.
    Levee unit no. 10, mile 136.6 to mile 139.4 above mouth of White River, West
I'ork, Ind.: Construction of levees and appurtenant works to provide protec-
tion to the town of Worthington and agricultural area; House Document No.
100, Seventy-third Congress, first session; estimated construction cost, $39,000;
estimated cost of lands and damages $54,000.
    Levee unit no. 9, mile 121 above mouth of White River, West Fork, Ind.:
  Construction of levees and appurtenant works to provide protection for agri-
cultural area; House Document No. 100, Seventy-third Congress, first session;
  estimated construction cost, $4,025; estimated cost of lands and damages,
 $12,675.
    Gill township levee unit, mile 152 to mile 162 above mouth of Wabash River,
  Ind.: Raising and improving existing levees to increase protection for small
  villages and agricultural area; House Document No. 100, Seventy-third Con-
gress, first session; estimated construction cost, $180,250,1 estimated cost of
lands and damages, $152,150.
    Levee unit no. 2, mile 9 to mile 27.6 above mouth of Wabash River, Ind.:
  Construction of levees and appurtenant works to provide protection for agri-
  cultural area; House Document No. 100, Seventy-third Congress, first session;
  estimated construction cost, $734,900;1 estimated cost of lands and damages,
  $417.100.
    Levee unit no. 1, mile 0.0 to mile 15.5 above mouth of Wabash River, Ill.:
  Construction of levees and appurtenant works to provide protection for agri-
  cultural area; House Document No. 100, Seventy-third Congress, first session;
  estimated construction cost, $812,225; estimated cost of lands and damages,
 $371,775.
     Levee unit no. 3, mile 201.7 to mile 231.5 above mouth of White River, East
  Fork, Ind.: Construction of levees and appurtenant works to provide protec-
  tion for agricultural area; House Document No. 100, Seventy-third Congress,
  first session; estimated construction cost, $634,475;1 estimated cost of lands
  and damages, $281,525.
     Levee unit no. 5, mile 58.1 to mile 94.5 above mouth of Wabash, River, Ind.:
  Construction of levees and appurtenant works to provide protection for agri-
  cultural area; House Document No. 100, Seventy-third Congress, first session;
  estimated construction cost, $1,339,500;1 estimated cost of lands and damages,
  $694,520.
     Levee units nos. 3 and 4, mile 15.6 to mile 61.4 above mouth of Wabash River,
  Ill.: Construction of levees and appurtenant works to provide protection for
  agricultural area; House Document No. 100. Seventy-third Congress, first ses-
  sion; estimated construction cost, $1,580,000; estimated cost of lands and
  damages, $797,000.

   1 Estimate   may have to be increased to meet desires of local interests for more comp'ete
protection.
1148       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Levee unit no. 8, mile 72 to mile 91.8 above month of White River, West
Fork, Ind.: Construction of levees and appurtenant works to provide protection

                                                      1
for agricultural area; House Document No. 100, Seventy-third Congress, first
session; estimated construction cost, $376,000;
damages, $170,000.
                                                  estimated cost of lands and

  Brevoort levee unit mile 104 to mile 127.5 above mouth of Wabash River,
Ind.: Raising and improving existing levees to increase protection for agricul-
tural area and portion of the city of Vincennes; House Document No. 100,
Seventy-third Congress, first session; estimated construction cost $976,500;
estimated cost of ]ands and damages, $952,500.
  The total estimated cost of the projects authorized is $19,3,5,100,
made up of $11,990,025 for construction, and $7,245,075 for land and
damages.
  Local cooperation.-See page 6.
  Operations and results during fiscal year.-Operationsduring the
year consisted of making field surveys and preparation of plans
and specifications for the construction of the following authorized
projects:
       Indianapolis, Warfieigh section, on West Fork of White River, Ind,
       Indianapolis, Fall Creek section, on West Fork of White River, Ind.
       Peru, on Wabash River, Ind.
       Logansport, on Wabash River, Ind.
       Anderson, on West Fork of White River, Ind.
       Muncie, on West Fork of White River, Ind.
       Lyford levee unit, on Wabash River, Ind.
       Gill Township levee unit, on Wabash River, Ind.
       Levee unit no. 5, on Wabash River, Ind.
       Levee unit no. 8, on Wabash River Ind.
       Brevoort levee unit, on Wabash River, Ind.
  The above operations were accomplished with funds provided by
Executive order for assistance for educational, professional, and
clerical persons.
   Condition at end of fiscal year.--Field surveys and project plans
and specifications on the 11 projects listed above were 60 percent
complete on June 30, 1937.
  Proposed operations--Regular funds.-An allotment of $487,000
made during August 1937 will be applied to the construction of the
Brevoort levee unit, Wabash River, Ind. (contract Oct. 1, 1937, to
June 30, 1938).
  The amount reallotted July 8, 1937 ($2,500), plus the allotment
of $243,000 made from the Emergency Relief Appropration Act of
1937, will be applied as follows:
Construction of Brevoort levee unit, Wabash River, Ind. (contract
  Sept. 1, 1937, to June 30, 1938) ------------------------------                $243, 000
Continuation of work on project plans and specifications on the fol-
lowing   projects:  Logansport;  Indianapolis,        Warfleigh  section; Indi-
  anapolis, Fall Creek section; Peru; Anderson; Muncie; Lyford
levee; Gill Township levee; levee unit no. 5, Wabash River; levee
unit no. 8, West Fork, White River; and Brevoort levee unit (hired
labor July 1, 1937, to Dec. 31, 1937) -----------------------------                2, 500

       Total --------------         ---------------------------------            245, 500
   The additional sum of $45,000 can be profitably expended during
the fiscal year 1938 for completion of the project plans and specifica-
tions on the above-named projects.
  1
    Estimate may have to be increased to meet desires of local interests for more com-
plete protection.
             RIVERS AND HARBORS-LOUISVILLE,                                    KY., DISTRICT              1149
  The additional sum of $3,172,200 can be profitably applied to the
construction of the following projects during the fiscal year 1939:
Indianapolis, Fall Creek section, on West Fork of White River, Ind.
   (contract July 1, 1938, to June 30, 1939) ----------------------                                   $743, 000
Muncie, on West Fork of White River, Ind. (contract July 1, 1938, to
  June 30, 1939) -------------------------------------------                                           958, 000
Brevoort levee unit, Ind. (contract July 1, 1938, to June 30, 1939)___                                 236, 500
Lyford levee unit, mile 227.5 to mile 234.7 above mouth of Wabash
  River, Ind. (contract July 1, 1938, to June 30, 1939)--------------                                  184, 200
Gill Township levee unit, mile 152 to mile 162 above mouth of
  Wabash River, Ind. (contract July 1, 1938, to June 30, 1939) ------                                  350, 500
Indianapolis, Warfleigh section, Ind. (contract July 1, 1938, to June
  30, 1939)    ------------------------------------------------                                        200, 000
Anderson, on West Fork of White River, Ind. (contract July 1, 1938,
  to June 30, 1939) ------------                     ------------------------                          127, 000
Levee unit no. 10, White River, Ind. (contract July 1, 1938, to June
  30, 1939)---------------------                   --------------------------                            39,000
Levee unit no. 8, mile 72.0 to mile 91.8 above mouth of White River,
  West Fork, Ind. (contract July 1, 1938, to June 30, 1939)--                                          334, 000

         Total ----------------------------------------------                                        3, 172, 200
                                     Cost and financial summary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937----------------------------
      Net total expenditures---------------      --------                                          --------
Total amount appropriated to June 30, 1937__ ____.....__
Amount allotted from War Department Appropriation Act approved
July 19, 1937-------                                                                                  487, 000
                                                                                                      $-----------------------------
Amount allotted from Emergency Relief Appropriation Act approved
June 29, 1937----------    ----------------------------------                                         243, 000
      Amount to be accounted for-----------------------------                               730, 000
Amount available for fiscal year 1938--------------------------                              30, 000
Amount (estimated) required to be appropriated for completion of
existing project 1- - - - - - - - -- - - - - - - - - - - - -- - - -- - -- -     - -         ---
                                                                                        18, 505, 100
Amount that can be profitably expended in fiscal year ending June
                              1    - - -- -- -- -- -- - ---- - - - - - - - - -- - - -
30, 1939, for new work                                  __                           -  3, 172, 200
  1
      Exclusive of available funds.

Status of reports called for by river and harbor acts and committee resolutions

                                                       Date trans-                                 Recommends.
         Locality             Authorization act         mitted to             Document no.             tion
                                                         Congress


Caney Creek, Grayson        River and Harbor Act       Nov. 19, 1936-----.-..-----.-               Unfavorable.
County, Ky.                  Aug. 30, 1935.
Ohio and Mississippi        Flood Control Com-         Apr. 28, 1937     Flood Control 1, 75th     Favorable.
Rivers,  comprehen-          mittee resolution,                           Cong., 1st sess.
sive flood-control plan.     Feb. 10, 1937.
1150     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
            DULUTH, MINN., DISTRICT
  This district comprises all harbors and tributary waterways on
the United States side of Lake Superior and Lake of the Woods.
  District engineer: Maj. A. B. Jones, Corps of Engineers.
  Division engineer: Col. L. V. Frazier, Corps of Engineers.
                                  IMPROVEMENTS

                                   Page                                       Page
1. Grand Marais Harbor, Minn_      1150  9. Grand Marais, Harbor of
2. Duluth-Superior      Harbor,               Refuge, Mich-----------         1170
     Minn. and Wis    -------
3. Cornucopia Harbor, Wis-.
                                   1152 10. Warroad Harbor and River,
                                   1155       Minn   ------------       -_-   1172
4. Ashland Harbor, Wis___          1156 11. Examinations, surveys, and
5. Ontonagon Harbor, Mich --       1158       contingencies (general)- -      1174
6. Keweenaw Waterway, Mich_        1161 12. Other projects for which no
7. Presque Isle Harbor, Mich___    1166       estimates are submitted___      1175
8. Marquette Harbor, Mich....      1168 13. Plant allotment .-----------..    1175

                  1. GRAND MARAIS         HARBOR,     MINN.

   Location.-The harbor is situated on the north shore of Lake
Superior, 106 miles northeast from Duluth, Minn. (See U. S. Lake
Survey Chart No. 9.)
   Existing project.-This provides for rock-filled timber crib break-
water piers 350 feet in length from the east and west points of the
bay to narrow the entrance; for constructing concrete sea walls across
the ledge at the southeast corner of the harbor; and for dredging an
anchorage area of 36.5 acres to a depth of 16 feet with depths near
the entrance of 18 and 20 feet, all depths referred to low-water datum
for Lake Superior, which is 601.6 feet above mean tide at New York.
The ordinary variation of water level extends from 0 to +1 foot
above low-water datum.
   The estimate of cost for new work, revised in 1935, is $209,000.
The latest (1935) approved estimate of cost for annual maintenance
is $6,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1879, provided for the breakwaters
and the dredging of an anchorage area of 26 acres to a depth of
16 feet (H. Ex. Doc. No. 75, 43d Cong., 2d sess.) ; the act of August
30, 1935, provided for the sea walls across the ledge in the southeast
corner of the harbor and the enlarging of the anchorage basin and
deepening of the entrance (Rivers and Harbors Committee Doc. No.
22, 72d Cong., 1st sess.). The latest published map is in the last-
mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three privately owned wharves.
These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-New work was com-
pleted by dredging 88,250 cubic yards of material from the anchorage
basin and entrance channel by contract, and the construction of 419
linear feet of concrete sea wall by hired labor along the southeast
corner of the harbor.
             RIVERS AND HARBORS--DULUTH, MINN., DISTRICT                                                          1151
   The costs of the work done during the year were $41,760.42 for
dredging and $7,122.81 for sea walls, making a total of $48,883.23,
all for new work. The total expenditures were $39,279.31.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937. Project depth of 16 feet is available in the anchor-
age basin dredged by the United States and by private parties un-
der permit. Under permits to private parties, 420,795 cubic yards
have been dredged since 1922 without cost to the United States. No
private dredging was done during the fiscal year. Project depths
of 18 and 20 feet are available in the entrance channel.
   The concrete sea walls are in excellent condition. The break-
waters are in good condition, except that some armor plates were torn
off during a storm in the fall of 1936, and some riprap stone is re-
quired along the base of the cribs. The gravel spit along the eastern
side of the harbor is too low to prevent waves from rolling into the
harbor during severe storm periods.
   The total costs of the existing project at the end of the fiscal year
were $209,819.91 for new work, and $101,217.89 for maintenance, a
total of $311,037.80. The total expenditures were $301,682.61.
   Proposed operations.-The balance unexpended June 30, 1937, to-
gether with an allotment of $11,000 made during July 1937, will be
applied as follows:
Accounts     payable------------------------------                                                            $9, 532. 02
Maintenance :
   Repairing and replacing armor plates on breakwaters with hired
      labor during August 1937----------------------------------2, 000. 00
   Riprapping breakwaters with U. S. derrickboat Coleman during
      July and August 1937, and June 1938                         25, 183. 67
          Total---------------------------------------                                   -----------          36, 720. 69
  The additional sum of $5,000 can be profitably expended during
the fiscal year 1939 for maintenance repairs to the breakwaters with
the U. S. derrickboat Coleman during the summer of 1938.
                         Cost and financial summary
Cost of new work to June 30, 1937----------------------------$209, 819. 91
Cost of maintenance to June 30, 1937--------------------------  101, 217. 89
      Total cost of permanent work to June 30, 1937----- ------    311, 037. 80
Undistributed costs June 30, 1937---------------------------------      176. 83
      Net total cost to June 30, 1937---------------------------                                          311, 214. 63
Plus accounts receivable June 30, 1937--.........

      Gross total costs to June 30, 1937------------------------311, 214. 63
Minus accounts payable June 30, 1937---------------------------    9, 532. 02
     Net total expenditures----------------------------------- 301, 682. 61
Unexpended balance June 30, 1937------------------------------ 25, 720. 69
        Total amount appropriated to June 30, 1937----------------                                        327, 403. 30

       Fiscal year ending June 30                      1933           1934            1935         1936           1937


Cost of new work-----          ------          -------------------                ------------------------      $48,883.23
Cost of maintenance-------------------$31, 765.45                  $19,95.0            $14.86
Total expended-- -      -.--.--
                          .                 .--      31, 759. 21    19, 963. 74         14.86       248. 73      39, 279. 31
Allotted-_---.------------------                     31, 765. 45    19, 972. 36     10 000. 00   43,248. 73      17, 000. 00

        20196--37-pt. 1---73
115        REPORT OF CHIEF OF' ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 ----------------------           $48,000. 00
Amount allotted from War Department Appropriation
  Act approved April 9, 1935____--        __-----------
Amount allotted from War Department Appropriation
                                                     $4, 000. 00

  Act approved May 15, 1936 ----------------------   13, 000.00
                                                                  17, 000. 00
      Amount to be accounted for_ ----------------------                 65, 000. 00
Gross amount expended -------------------------------                    39, 279. 31

      Balance unexpended June 30, 1937                                     25, 720. 69
Outstanding liabilities June 30, 1937                       , 532. 02
                                                           9------------------
Amount covered by uncompleted contracts---- ---            2, 370. 02
                                                                           11, 902. 04
     Balance available June 30, 1937-------------------------13, 818. 65
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------    11, 000. 00
     Balance available for fiscal year 1938 ----------     _____-24,         818. 65
Amount that can be profitably expended in fiscal year ending June
30, 1939 for maintenance       ____1__
                                  - - -    -
                                        ____      -
                                                     _____ __   ___       5, 000. 00
  1 Exclusive of available funds.

             2. DULUTH-SUPERIOR HARBOR, MINN. AND WIS.

   Location.-This harbor is at the extreme western end of Lake
Superior. The cities of Duluth, Minn., and Superior, Wis., are
situated on the north and south sides, respectively. (See U. S. Lake
Survey Chart No. 966.)
   Previous projects.--Superior and Duluth were separate improve-
ments until consolidated by the River and Harbor Act of June 3,
1896. The original project for the harbor at Superior City was
adopted by River and Harbor Act of March 2, 1867; for Duluth
Harbor by River and Harbor Act of March 3, 1871. These projects
were modified by River and Harbor Acts of March 3, 1873, March 3,
1881, July 5, 1884, August 5, 1886, August 11, 1888, and July 13,
1892. The total cost and expenditures were $1,547,195, which cannot
be divided as to new work and maintenance. For further details see
page 1929 of Annual Report for 1915.
   Existing project.-This provides for (a) rebuilding the canal piers
at Duluth entry with stone-filled timber-crib substructure and con-
crete superstructure, 1,734 feet long and 300 feet apart for 1,250 feet,
then flaring to 540 feet apart at the harbor end; (b) replacing the
north and south piers at Superior entry with concrete piers, 2,096
and 1,584 feet long, respectively, 500 feet apart for 808 feet, then
flaring at the harbor end; (c) constructing 4,205 feet of rubble-
mound breakwaters, 900 feet of concrete pierheads on stone-filled
cribs, and 896 feet of concrete shore revetments at Superior entry,
the lake ends being 600 feet apart on the 30-foot contour in prolonga-
tion of the entrance channel and diverging to 2,100 feet apart at
the shore line; (d) for dredging a flared lake approach to Duluth
entry 32 feet deep, and a channel between the piers 32 feet deep at
the pierheads, gradually decreasing to 26 feet at the harbor basin;
 (e) a depth of 26 feet in the northern part of the harbor basin
inside Duluth entry consisting of 201 acres; a depth of 25 feet in
the southern portion of the harbor basin and part of the East Gate
Basin; and a depth of 22 feet in the remainder of East Gate Basin,
         RIVERS AND HARBORS-DULUTH, MINN., DISTRICT              1153
and in Superior Front Channel, through Superior Bay, 600 feet in
width, extending to Superior Harbor Basin, a distance of 13,200 feet;
 (f) a flared lake approach to Superior entry 32 feet deep; a channel
between the breakwater entrance and the pierheads, with a width
varying from a minimum of 600 feet to a maximum of 1,100 feet,
32 feet deep at the breakwater entrance, gradually decreasing to
28 feet at the pierheads; a stilling basin of 20 acres, 24 feet deep,
inside the breakwater; and a channel between the piers, 28 feet at
the pierheads, gradually decreasing to 25 feet at the harbor basin;
 (g) a harbor basin of 290 acres, 25 feet deep, inside Superior entry;
a channel in Allouez Bay 2,100 feet long, 400 feet wide, and 22 feet
deep; a depth of 25 feet in the south channel of St. Louis Bay from
the entrance (East Gate Basin) to the cross-channel, inclusive, with
widths varying from 500 to 900 feet; (h) a depth of 25 feet in a
cross-channel, with minimum width of 1,150 feet, and a depth of
25 feet in the north channel of St. Louis Bay opposite the cross-
channel; elsewhere in the north channel and the south channels and
the St. Louis River to a point 9,600 feet above the Grassy Pointy
Bridge, a depth of 21 feet, and, except at Arrowhead Bridge, a
minimum width of 400 feet; and a channel thence up St. Louis
River 20 feet deep and 200 feet wide to Spirit Lake (southerly
end of Big Island), a distance of about 14,200 feet; and (i) a channel
in Howards Bay 6,000 feet long, narrowing in width from 300 to 125
feet, and 21 feet deep; and a channel 3,300 feet long, 100 feet wide,
and 20 feet deep at Twenty-first Avenue West in Duluth.
    The project depths are referred to low-water datum for Lake Su'
perior, which is 601.6 feet above mean tide at New York. Highest
single gage reading, November 28, 1905, was 3.7 feet above low-water
datum; lowest single gage reading, January 23, 1926, was 1.95 feet
below low-water datum; the annual fluctuation is about 1 foot.
    The estimate of cost for new work, revised in 1932, was $7,100,000,
exclusive of amounts expended on previous projects. The latest
 (1932) approved estimate for annual cost of maintenance is $100,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for dredging alone
 (H. Ex. Doc. No. 59, 53d Cong., 3d sess.); act of June 13, 1902,
provided for rebuilding the piers at Superior entry; act of March
2, 1907, provided for the enlargement of the plant for Superior entry
and for additional dredging near the draw span of the Northern
Pacific Railroad Bridge (H. Doc. No. 82, 59th Cong., 2d sess.); sec-
tion 4 of the Administrative Act of May 28, 1908, provided for dredg-
ing an additional area for the basin inside the Duluth entrance to a
depth of 22 feet (H. Doc. No. 221, 60th Cong., 1st sess.); act of
July 27, 1916, provided for continuing improvements by enlarging
the Superior Harbor Basin (H. Doc. No. 651, 64th Cong., 1st sess.);
act of March 2, 1919, provided for removing the shoal point in the
southerly end of the East Gate Basin (H. Doc. No. 1018, 64th Cong.,
1st sess.); acts of January 21, 1927 (H. Doc. No. 245, 69th Cong.,
1st sess.), and July 3, 1930 (Rivers and Harbors Committee Doc. No.
32, 71st Cong., 2d sess.), provided for the channel in Howards Bay;
and the present dimensions of channels and basins were authorized by
the Public Works Administration September 6, 1933, and adopted
by the River and Harbor Act approved August 30, 1935 (H: Doc.
1154      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1931

No. 482, 72d Cong., 2d sess.). For latest published map see last-
mentioned document.
    Terminal facilities.-Except that the facilities for handling pack-
age freight, lumber, and general merchandise are susceptible of im-
provement, the terminal facilities, consisting of wharves, ore docks,
and grain elevators, are believed to be adequate for existing com-
merce, and are being increased as necessity demands.
    Operations and results during fiscal year.-The following main-
tenance work was done by United States plants: 193,122 cubic yards
of material was dredged from channels in St. Louis Bay and Duluth
Harbor Basin; 1,269 tons of stone were placed in repairing the
Superior entry breakwaters; 675 tons of stone were placed in rip-
rapping Duluth Canal piers.
   The costs of the various items of work done during the year were
as follows: $46,446.92 for dredging; $11,592.22 for breakwater re-
pairs; $2,507.64 for pier riprapping; $11,971.51 for inspections, sur-
veys, and harbor patrol. The total costs were $72,518.29, all for
maintenance. The total expenditures were $69,815.89.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935 at a saving of $242,709 under the estimated cost. The
following work has been accomplished: Dredging of channels and
basins under the existing project was completed in 1935; new piers,
aggregating 3,468 feet in length, of concrete on stone-filled cribs
founded on piles, completed in 1901 at Duluth Canal; new piers,
aggregating 3,680 feet in length, of concrete on piles, completed in
1909 at Superior entry; converging breakwaters comprising 4,205
linear feet of rubble mound, 900 linear feet of stone-filled cribs and
concrete superstructure pierheads founded on piles, and 896 linear
feet of concrete shore revetments on pile foundations, completed in
1912. All piers and revetments are riprapped.
   Project depths are available in the harbor as shown by surveys
completed in March 1937, except in an area along the west project
line in the northwest corner of Duluth Harbor Basin, where the con-
trolling depth is 21.5 feet, and along a portion of the northerly and
southerly project lines of the Superior entry stilling basin.
   The entrance piers and breakwaters are all in good condition.
   The total cost was $8,673,132.59, of which $6,857,290.52 was for new
work and $1,815,842.07 for maintenance. The total expenditure was
$8,673,590.80.
   Proposed operations.-The balance unexpended June 30, 1937, to-
gether with an allotment of $64,000 made during July 1937, will be
applied to maintenance, as follows:
Accounts payable _____     __---______________                   __ $862. 33
Dredging with U. S. dipper dredge Gaillard during October and
  November 1937, and April and May 1938 __________________ _ 45, 000. 00
Breakwaters, repairs to main portions and wings with U. S. derrick
  boat Coleman during September and October 1937__..           ___________
                                                                   10, 000. 00
Piers, riprap with U. S. derrick boat Coleman during May 1.938_ _- 9, 727. 36

       Total---   ------------------------------------------                 65, 589. 69
  Annual maintenance dredging for the removal of shoals, and
maintenance repairs to breakwaters and piers will be necessary. The
additional sum of $70,000 can be profitably expended during the fiscal
year 1939, as follows:
                  RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                                                           1155
Maintenance:
     Dredging with U. S. dipper dredge Gaillard during the fall of 1938
       and spring of 1939-------------------       --------------- --- $50, 000
    Breakwaters-repairs to main portion with U. S. derrick boat
       Coleman during fall of 1938 and spring of 1939_  ______
                                                     ---------          10, 000
    Piers, riprap with hired labor during fall of 1938---------------- 10, 000
            Total------------------------------------------------------                                               70, 000

                                           Cost and financial summary
Cost of new work to June 30, 1937---------------------------                                           1$8, 404, 485. 52
Cost of maintenance to June 30, 1937                                                                      , 815, 842. 07
                                                                                                         1------------------------

      Total cost of permanent work to June 30, 1937---------                                             10, 220, 327. 59
Undistributed costs June 30, 1937____1111111111111111_                                                         1, 087. 85

     Net total cost to June 30, 1937________________________                                             10, 221, 415. 44
Minus accounts payable June 30, 1937------------------------                                                      629. 64

      Net total expenditures------------------------------                                            110, 220, 785. 80
Unexpended balance June 30, 1937 ---------------------------                                                  , 589. 69
           Total amount appropriated to June 30, 1937                                 --    -            10, 222, 375. 49

    Fiscal year ending June 30                1933             1934            1935               1936                1937


Cost of new work__ --            -------     $1, 434. 33   $281, 404. 92   $682, 744. 95    $125, 123. 96      _-            ...
Cost of maintenance------.....       _       78, 888. 28     29, 237. 99     21, 172. 14      27, 341. 19           $72, 518. 29
       Total cost._      -------------      80, 322. 61     310, 642. 91    703, 917. 09        152, 465.15          72, 518. 29
Total expended...-------------               77, 730. 25    254, 945.64      186, 178. 34       237, 993. 62         69, 815. 89
Allotted--------.--__-_-_--                 115, 346. 66   1,118, 001.34   -418, 894.08          24, 224.73         -15, 500.00

Balance unexpended July 1, 1936___________________-_________ $86, 905. 58
Deductions on account of revocation of allotment___________--__ 15, 500. 00
      Net amount to be accounted for---------------------------- 71, 405. 58
Gross amount expended     ---------------------------  $70, 172. 54
Less reimbursements collected ------------------------      356. 65
                                                                    69, 815. 89
           Balance unexpended June 30, 1937----------------------                                               1, 589. 69
Outstanding           liabilities June 30, 19378----------------                                                      62. 33

     Balance available June 30, 1937_---------------------------              727. 36
Amount allotted from War Department Appropriation Act approved
July 19, 1937----------------                _             __
                                                     _-----------------------------
                                                                          64, 000. 00
      Balance available for fiscal year 1938----------------------_                                            64, 727. 36
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                     70, 000. 00
   1 Includes $1,089,273.83 Public Works funds.
   2 Exclusive of available funds.

                                  3. CORNUCOPIA                 HARBOR, WIS.

  Location.-The harbor is located" at the mouth of the Siskiwit
River on the south shore of Lake Superior, 49 miles east from
Duluth, Minn. (See U. S. Lake Survey Charts Nos. 9 and 96.)
  E'xisting project.-This provides for an entrance channel 50 feet
wide and 10 feet deep between the piers constructed and maintained
by local interests from Siskiwit Bay to a turning basin 200 feet long,
1156      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

8 feet deep, and 140 feet wide, with a maximum width of about
180 feet; and two inner channels 50 feet wide and 8 feet deep, with
lengths of 150 and 300 feet. All depths are referred to low-water
datum for Lake Superior, which is taken at 601.6 feet above mean
tide level at New York. The ordinary variation of water level
extends from 0 to +1 foot above low-water datum.
    The estimate of cost for new work, made in 1937, is $11,000. The
latest (1937) approved estimate of cost for annual maintenance is
 $200.
    The existing project was authorized by River and Harbor Act
approved August 26, 1937 (Senate committee print, 75th Cong., 1st
sess.). This document contains the latest published map.
    Local cooperation.--The River and Harbor Act approved August
26, 1937, adopted the existing project subject to the provisions that
local interests furnish, free of cost to the United States, necessary
easements or lands for the improvement and for maintenance when
and as required, remove all structures from the area to be improved,
and agree to complete the new west entrance pier and to maintain
both piers. The west pier is about 80 percent completed. Prelim-
inary work regarding the conveying of necessary lands and ease-
ments to the United States and the removal of structures from area
to be improved has been started. It is expected that the require-
ments of local cooperation will have been complied with by June
;30, 1938.
    Terminal facilities.-About 600 lineal feet of privately owned
docking space are available for small fishing boats. These facilities
are considered adequate for existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-No work has been done or funds
expended on the existing project. At the end of the fiscal year, a
depth of 4 feet was available in the existing channel.
   Proposed operations.-No funds are available; no work is con-
templated during fiscal year 1938.
    The sum of $11,000 can be profitably expended during the fiscal
year 1939 for new work necessary to complete the existing project.
                          Cost and financial summary

Cost of new work to June 30, 1936.......__
Cost of maintenance to June 30, 1936       ----------------------------------
      Net total expenditures.     ----------------        ----------------


       Total amount appropriated to June 30, 1936 .......

Amount (estimated) required to be appropriated for completion of
existing project ---------         --------------------------------  $11, 000
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work--------------------------------------              11, 000
                         4. ASHLAND HARBOR, WIS.

   Location.-The harbor is situated at the head of Chequamegon
Bay, on the south shore of Lake Superior. (See U. S. Lake Survey
Charts Nos. 961 and 964.)
   Existing project.-This provides for an 8,00-foot breakwater and
a dredged channel along the dock front, 75 feet outside the harbor
line, 20 feet deep and 200 feet wide from a point 400 feet west of
         RIVERS AND HARBORS-DULUTH, MINN., DISTRICT             1157
Seventeenth Avenue West produced to Eighth Avenue West pro-
duced; and 21 feet deep and 400 feet wide from Eighth Avenue West
produced to Ellis Avenue produced; for an entrance channel 21 feet
deep and 400 feet wide extending in a northerly direction from the
easterly end of this channel; and a basin 25 feet deep and about
4,800 feet long, extending from a point about 400 feet west of the
Soo Dock to a point 1,000 feet east of the Chicago & North Western
dock no. 3, and extending from a line 75 feet outside of the harbor
line to deep water in the bay.
   The project depths are referred to low-water datum for Lake
Superior, which is 601.6 feet above mean tide at New York. The
ordinary variation of water level extends from 0 to +1 foot above
low-water datum.
   The estimate of cost for new work, revised in 1932, was $701,400.
The latest (1932) approved estimate for annual cost of maintenance
is $19,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for a breakwater
7,900 feet long and dredging to remove shoal (H. Ex. Doc. No. 89,
48th Cong., 2d sess., and Annual Report for 1886, p. 1674, and 1887,
p. 1966), act of August 11, 1888, appropriated $60,000 for "con-
tinuing improvement on the enlarged project." On the completion
of the Poe Lock in 1896, with an available depth of 20 feet, the
dredging at Ashland Harbor was carried to a similar depth; act
of March 3, 1899, modified by the act of June 6, 1900, provides for
a detached breakwater extending 4,700 feet out from the shore
at a point 2,600 feet east of the main breakwater (prolonged) and
parallel thereto; act of August 8, 1917, provided for the comple-
tion of this improvement, omitting the detached breakwater, and
defining the depth and extent of channel to be dredged (H. Doc. No.
1698, 64th Cong., 2d sess.) ; act of July 3, 1930, provided for the
widening of part of this channel, for an entrance channel, and for
the basin in the eastern part of the harbor (S. Doc. No. 133, 71st
Cong., 2d sess.); and the deepening of the east basin to 25 feet and
the west channel as far as Eighth Avenue West extended, to 21 feet,
were authorized by the Public Works Administration, September 6,
1933, and adopted by the River and Harbor Act approved August
30, 1935 (Rivers and Harbors Committee Doc. No. 46, 72d Cong., 1st
sess.). The latest published map is in the last-mentioned document.
   Terminal facilities.-The city of Ashland owns 4,150 feet of water
front, exclusive of street ends, for future public needs, and has one
wharf, which is now in ruins.
   The wharves and ore docks, with the exception of those for
handling lumber, are served by railroads. The facilities are consid-
ered adequate for the existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
in the west channel was done during August and September 1936, by
Government plant and hired labor, and a total of 27,452 cubic yards
of material was removed.
   The total costs and expenditures were $12,000, all for maintenance
dredging.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935. The breakwater is in good condition, except for some
1158          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

settlement causing low places which should be brought up to the
prescribed elevations. There has been some shoaling in the west
channel. On June 30, 1937, there was a controlling depth of 21 feet
in the west channel and 25 feet in the basin.
   The total cost was $1,185,120.09, of which $732,375.49 was for new
work and $452,744.60 for maintenance. The total expenditure was
$1,186,806.17.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1938.
   The additional sum of $25,000 can be profitably expended during
the fiscal year 1939 for maintenance as follows:
Dredging with U. S. dipper dredge Gaillard during spring of 1939_     $15, 000                         -_
Breakwaters, minor repairs with U. S. derrick boat Coleman during the
  fiscal year 1939--------------------------------- ----- ------ ---   10, 000

         Total------------------                   ----------------------------------                        25, 000
                                       Cost and financial summary

Cost of new work to June 30, 1937 ---------------------------                                     1 $732,   375. 49
Cost of maintenance to June 30, 1937-------------------------                                          452, 744. 60
      Total cost of permanent work to June 30, 1937                            -----------        1, 185, 120. 09
Undistributed costs June 30, 1937------------------------------                                        1, 686. 08
      Net total cost to June 30, 1937--------------------------1,     186, 806. 17
Net total expenditures ---------------------------------------     1, 186, 806. 17
Total amount appropriated to June 30, 1937--------------          1 186, 806. 17

    Fiscal year ending June 30              1933           1934            1935           1936               1937


Cost of new work ____n_a....-... __ __---          ___    $3, 901. 66   $157, 370. 51   $60, 622. 52   ...
Cost of maintenance_ __ __.     _ _._     $28, 427.15                                     8, 639. 63           $12, 000
      Total cost----------------           28, 427. 15     3, 901. 66    157, 370. 51    69, 262. 15            12, 000
Total expended....----------------         30, 113. 23     3, 819. 24    126, 699. 95   100, 015. 13            12, 000

Allotted___--------- -------
                         ___               36, 475. 21   215, 638. 02     26, 894. 69   -6, 360. 37


Balance unexpended July 1, 1936--------------------------------                                        $12, 000. 00
Gross amount expended__----------------------------------------                                         12, 000.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance -------------------------------------                                        25, 000. 00
   xIncludes     $221,894.69 Public Works funds.

                                 5. ONTONAGON HARBOR, MICH.

  Location.-The harbor is situated on the south shore of Lake
Superior. It consists of the improvement of the mouth of Ontonagon
River. (See U. S. Lake Survey Chart No. 9.)
  Previous project.-Adopted by River and Harbor Act of March 2,
1867. The cost and expenditures were $284,801.24 for new work and
$113,326.76 for maintenance, a total of $398,128, prior to commence-
ment of work under existing project in 1911. For further details see
page 1931 of Annual Report for 1915.
  Existing project.-This provides for a flared lake approach chan-
nel 17 feet deep with widths narrowing from 400 feet at the outer
end to 150 feet opposite the outer end of the west pier; a channel
between the piers 150 feet wide, 17 feet deep in the outer 250 feet,
          RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                         1159
and 15 feet deep in the inner 2,200 feet; an inner basin 15 feet deep
and 900 feet long, extending between lines 50 feet from the existing
wharves on each side of the river, the maximum width being 285 feet;
and for maintenance of this channel, basin, and the 4,990 feet of en-
trance piers. The project depth is referred to low-water datum for
Lake Superior, which is taken at 601.6 feet above mean tide level at
New York. The ordinary variation of water level extends from 0 to
 +1 foot above low-water datum.
   The estimate of cost for new work, revised in 1937, is $19,500, ex-
clusive of amount expended on previous project. The latest (1937)
approved estimate for annual maintenance is $13,500.
   The existing project was authorized by the River and Harbor Act
of June 25, 1910, which provided for a channel 17 feet deep and 150
feet wide through the bar and 15 feet deep and 100 feet wide between
the piers, and pier maintenance (H. Doc. No. 602, 61st Cong., 2d sess.),
and the act of August 26, 1937, authorized the present project widths
and the inner basin (Senate committee print, 74th Cong., 2d sess.).
The latest published map is in Senate committee print, Seventy-
fourth Congress, second session.
   Terminal facilities.-There are no publicly owned wharves. There
are one merchandise and coal wharf, one coal wharf, and a few small
fish wharves in active use. The terminal facilities are considered
adequate for the commerce of the harbor.
   Operations and results during fiscal year.-Maintenance dredging
was done during July 1936, and May and June 1937, and a total of
36,210 cubic yards was removed. Minor repairs were made to stone-
covered portions of the piers, 280 tons of stone being placed. The
costs were $17,436.53 for dredging and $1,831.28 for pier repairs,
making a total of $19,267.81, all for maintenance. The total expendi-
tures during the year were $6,721.96.
   Condition at end of fiscal year.-The existing project is about 50
percent completed. The piers are in good condition, except for
minor repairs needed on stone-covered portions. To complete the
project there remains the widening of the channel from 100 to
150 feet, the dredging of a flared entrance to a depth of 17 feet,
and the dredging of an inner basin to a depth of 15 feet, all of which
was authorized by the River and Harbor Act of August 26, 1937.
   The total costs were $4,460 for new work and $403,870.35 for
maintenance, a total of $408,330.35. The total expenditures were
$396,183.65.
   Proposed operations.-The balance unexpended June 30, 1937, to-
gether with an allotment of $20,000 made during July 1937, will be
applied to maintenance, as follows:
Accounts payable---------------------------------------------          $10, 988. 30
Dredging with U. S. derrick boat Coleman during July 1937 and May
  and June 1938-----------------------------------------------________  17, 827.24
Piers: Minor repairs to stone-covered portion by hired labor during
  summer of 1937-----------------------------------------------          5,000.00
      Total----------------------------------------------------          33,815. 54
  New work of widening channels will be required under approved
modification of project. Annual maintenance dredging and minor
repairs to stone-covered piers will be necessary. The additional sum
1160            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of $35,000 can be profitably expended during the fiscal year 1939,
as follows:
New work: Dredging flaring lake approach, widening entrance channel,
and dredging inner basin with U. S. dipper dredge Gaillard during
July 1938 -----------------------------------------------           $15,000
Maintenance work:
    Dredging with U. S. dipper dredge Gaillard during May
      and June 1939----------------------------------       $15, 000
    Piers: Minor repairs to stone-covered portion by hired
      labor during summer of 1938---------------------        5, 000

              Total for maintenance -------                                           --
                                                                                   ___-_____                      -             _____        20, 000
              Total for maintenance and improvement _______------                                                                   __       35, 000

                                         Cost and financial summary
Cost of new work to June 30, 1937_-- ------   _____   ---                                                                  __$289, 261.24
Cost of maintenance to June 30, 1937-----------------                                                                          517, 197. 11
      Total cost of permanent work to June 30, 1937___----------                                                                        806, 458. 35
Undistributed costs June 30, 1937       -____---__----__    _                                                                                399. 15
      Net total cost to June 30, 1937_--____-----------__                                                                               806, 857.50
Minus accounts payable June 30, 1937 ------------------------                                                                            12, 545. 85

     Net total expenditures_ ____ --- ____--     _---                                                                                   794, 311. 65
Unexpended balance June 30, 1937 ---------------------------                                                                             13, 815.54

           Total amount appropriated to June 30, 1937- -----------                                                                      808, 127. 19

           Fiscal year ending June 30                           1933               1934                1935                 1936             1937


Cost of new work ..-------------------------------                                     -------------------------------
Cost of maintenance____---_-_-_--__                     $35, 974. 67       $11, 256. 15 $31, 742. 43 $29, 386. 45                          $19, 267. 81

Total expended_--........------------                       34, 635. 64        12, 976. 33         32, 796. 33            27, 011. 52        6, 721. 96

Allotted    ......----------------------------              16, 772.96         54, 994.44          19, 000. 00            19, 000. 00          327. 24


Balance unexpended July 1, 1936-----_______------              $20,210. 26
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934      -------------------------------------        2, 827. 24
     Amount to be accounted for______----------------------------                                                                        23, 037. 50
Deductions on account of revocation of allotment------------__                                                                            2, 500. 00
      Net amount to be accounted for___------------       ____                                                                           20, 537. 50
Gross amount expended--------------_       _ --------------                                                                               6, 721.96
      Balance unexpended June 30, 1937------------------__                                                                               13, 815. 54
Outstanding liabilities June 30, 1937-__------------------_                                                                 _            10, 988. 30
     Balance available June 30, 1937_-_        -------                                                                                    2, 827. 24
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------_______   -------- __                                                                                  20, 000. 00
     Balance available for fiscal year 1938---------------------                                                                         22, 827. 24
Amount (estimated) required to be appropriated for completion of
                                                             -
   existing       project                             ------------------                                                                 15, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939:
    For new work 1--1- - - - -
                               -- -       -      -     -_                                                                                15,000. 00
                                                 - - -- -        -     -   -       -   -   -       -   -      -       -             -
      For maintenance                                                                                                                    20,000.00
           Total1 - - - - - - - - - - -- - - -       - --       - -    -       -       -       -       -                        -
                                                                                                                                         35, 000. 00
   1 Exclusive   of available funds.
          RIVERS AND HARBORS-DULUTH, MINN., DISTRICT             1161
                 6.   KEWEENAW WATERWAY,        MICH.

   Location.-This waterway is a navigable channel, minimum width
120 feet, 25 miles long, partly natural and partly artificial, across
Keweenaw Point, Mich. (See U. S. Lake Survey Chart No. 944.)
   Existing project.-This provides for a waterway across Keweenaw
Peninsula via Portage Lake, 25 feet deep and 300 feet wide, in-
creased to 400 feet through Portage Lake below the shoal at its head
and with a straight cut-off channel from Princess Point to Messners
Point; for a flaring eastern entrance from Keweenaw Bay, 28 feet
deep in the outer portion, diminishing to 25 feet in the inner portion,
protected by a breakwater 5,714 feet long; for a mooring basin inside
the east entrance, one-half mile long, 800 feet wide, and 25 feet deep,
with mooring piers protected by fender piling; for converging break-
waters at the western entrance, with westerly breakwater 2,645 feet
long and easterly breakwater 2,485 feet, having an entrance 500 feet
wide between the breakwaters; for a western entrance channel 32
feet deep lakeward of the entrance between the breakwaters, dimin-
ishing to 25 feet in quiet water and enlarged inside of the break-
waters into a maneuvering basin 1,000 feet in maximum width and
3,000 feet long; for a mooring basin inside the west entrance 3,600
feet long and 800 feet wide and 25 feet deep, with mooring piers
protected by fender piling, and for reveting the banks as necessary,
and new pierheads 400 feet long at the west entrance to the canal.
   The project depth is referred to low-water datum for Lake Su-
perior, which is 601.6 feet above mean tide at New York.
   The estimate of cost for new work, revised in 1935, is $5,173,400.
The latest (1935) approved estimate for annual cost of maintenance
is $60,000.
   On account of its length, the waterway is affected in a very slight
degree by lake fluctuations of short duration. The annual fluctua-
tion is about 1 foot.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for a 16-foot
channel of 70-foot bottom width, the renewal of canal revetments,
the reconstruction and extension of piers at the upper entrance to
30-foot depth of water, and at the proper time for the increase of
the channel depth to 20 feet with bottom width of not less than 120
feet; by modification approved March 15, 1898, the increase in width
and depth of channel was authorized (H. Doc. No. 105, 49th Cong.,
2d sess.) ; the act of June 25, 1910, provided for an anchorage basin
just within the lower entrance, about one-half mile long, 800 feet
wide; for a mooring pier on its westerly side 2,000 feet in length;
and for the purchase of the necessary land (H. Doc. No. 325, 60th
Cong., 1st sess.) ; act of March 2, 1919, provided for the Princess
Point cut-off channel (H. Doc. No. 835, 63d Cong., 2d sess.); and
the general deepening, widening, and straightening of channels and
basins to provide 25-foot depth with additional overdepth at en-
trances, the extension of the lower entrance breakwater, and the nec-
essary alteration or replacement of structures due to deepening of
channels were authorized by the Emergency Relief Administration
May 28, 1935, and adopted by the River and Harbor Act approved
August 30, 1935 (H. Dec. No. 55, 73d Cong., 1st sess.), which docu-
ment contains the latest published maps.
1162    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.--There are 31 privately owned wharves, hav-
ing a combined length of 19,040 linear feet, which are served by
improvements made along Keweenaw Waterway. The city of Han-
cock has one publicly owned wharf. The village of Houghton has
wharf improvements at the ends of three streets. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year-Maintenance.-Regular
funds with United States plant and hired labor, reconstruction of
the 2,007-foot mooring pier at the Portage River harbor of refuge
was completed, and 14,315 cubic yards of material were dredged in
Portage Lake.
   New uork.-Under regular funds, 1,287,898 cubic yards of mate-
rial were dredged by contract in deepening and widening the stilling
basin, upper canal, and Lily Pond. The inner piers at the upper
entrance were removed by United States plant and hired labor, a
total of 46,975 cubic yards of material being removed. Eleven thou-
sand four hundred and six cubic yards of material were removed by
United States plant and hired labor in excavating for a United
States Coast Guard boathouse.
   For work performed under regular funds, the costs of the various
items of work done during the year were as follows: $301,456.22 for
dredging, $87,428.46 for mooring piers, and $8,793.92 for inspections,
surveys, and waterway patrol. The total costs were $397,678.60,
of which $297,759.30 was for new work and $99,919.30 for mainte-
nance. The total expenditures during the year were $260,408.42.
   Under Emergency Relief funds, 428,013 cubic yards of material
were dredged by contract in deepening and widening the channel
from High Point to Lily Pond to 25 feet.          The total costs were
$61,736.20 and the expenditures $81,018.44, all for new work.
   The total costs for the year, all funds, were $359,495.50 for new
work, and $99,919.30 for maintenance, a total of $459,414.80. The
total expenditures were $341,426.86.
   Condition at end of fiscal year.-The existing project is 47 percent
completed. The breakwaters are in good condition except for a
weakness occurring in about 300 feet of the substructure of the
breakwater at the lower entrance.       The remaining timber revet-
ments along the waterway are in fair condition. The mooring pier
of the Lily Pond requires repairs to halt movement, and that at the
Portage River harbor of refuge is in good condition. Annual re-
dredging of channels will be required indefinitely. The controlling
depth, as shown by the last survey completed in March 1937 was
20 feet. To complete the project there remains the general deepen-
ing, widening, and straightening of channels and basins to provide
minimum depth of 25 feet and width of 300 feet; the extension of
the lower entrance breakwater, and the necessary alteration or re-
placement of structures due to deepening of channels.
   For work performed with regular funds, the costs of the existing
project were $2,271,106.89 for new work and $1,835,575.13 for
maintenance, a total of $4,106,682.02.    The total expenditures were
$4,1111317.14.
   For work performed with Emergency Relief funds the total costs
and expenditures were $182,825.77, all for new work. The total
cost, all funds, was $4,289,507.79, of which $2,453,932.66 was for new
          RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                        1163
work and $1,835,575.13 for maintenance.       The total expenditures
were $4.294,142.91.
   In addition, the sum of $402,241.74 was expended between 1893
and 1917 on the operation and care of the works of improvement
under the provision of the permanent indefinite appropriation for
such purposes.
  Proposed operations.-The balance unexpended June 30, 1937, in-
cluding accounts receivable at the end of the fiscal year and together
with an allotment of $307,000 made during July 1937, will be applied
as follows:
Accounts payable ___-------   -------------------------------         $188, 370.23

New work:
   Dredging, completion of widening and deepening of upper
     canal and entrance from Lake Superior to south end of Lily
     Pond, by contract-----------------------------------              549, 809. 53
   Dredging--widening and deepening from Portage River harbor
     of refuge to Keweenaw Bay, by contract, during May and
     June 1938 --------------------------------------        ---       200, 000. 00
   Dredging-acquisition of right-of-way and dumping easements,
     Portage River ----------------------                               20, 153. 75
         Total for new work-----------------       ---------           769, 963. 28
Maintenance :
   Dredging with U. S. dipper dredge Gaillard during Septem-
      ber 1937 and June 1938--------------------------------32, 000. 00
   Breakwaters, upper entrance-repairs with U. S. derrick boat
      Coleman during July and August 1937 ------------------- 15, 000. 00
   Breakwaters, lower entrance-repairs, by hired labor, during
      September and October of 1937__                               6, 000. 00
   Revetments-minor repairs, by hired labor, during summer of
      1937-----------------------------------------------          10, 000. 00
    Mooring pier, Lily Pond-strengthening and repairing 1,600
      linear feet by hired labor during fall of 1937 and spring of
      1938-------           -------------------------------------- 60,000.00
         Total for maintenance      ----------------------------       123, 000. 00
         Total for maintenance and improvement-------------        1, 081, 333. 51
  New work, consisting of deepening and widening channels and
basins and alterations or replacement of structures will be required
for work under approved modification of project. Annual dredging
for removal of shoals and minor repairs to breakwaters and revet-
ments will be necessary. The additional sum of $963,000 can be profit-
ably expended during the fiscal year 1939 as follows:
New work:
   Piers, upper entrance-construction of new piers and revetments
     under contract during summer and fall of 1938--------------    $152, 000
   Remove outer 100 feet of west breakwater at upper entrance and
     rebuild pier head by contract, summer of 1938_---------------    70, 000
   Dredging-straightening, widening, and deepening of channels in
     Portage River, from Portage Lake to Portage River harbor of
     refuge, by contract, work to be started July 1938------------- 600, 000
   Dredging in scattered locations to establish project depths and
     widths in Portage Lake and River, with U. S. dipper dredge
     Gaillard during summer of 1938--------------------------         60, 000
         Total for new work-------_____
                            ...                    -      -_-   _-_        882, 000
i164               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Maintenance :
    Breakwater, upper entrance-repairs with U. S. derrick boat
      Coleman during summer of 1938---------------------------                                                  $15, 000
    Breakwater, lower entrance-repairs by hired labor during fall
      of 1938 ---    ------------------------------------------                                                       6, 000
   Mooring pier, Lily Pond-strengthening and repairing 1,600 linear
      feet by hired labor during summer and fall of 1938------------                                              50, 000
   Revetments-minor repairs by hired labor during summer of 1938_                                                 10, 000
                Total for maintenance_ ---------------------------------                                         81, 000
                 Total for maintenance and improvement------------------                                        963, 000

                                           Cost and financial summary

                                        MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937 -- ___-- -                                __----------             $2, 271,106. 89
Cost of maintenance to June 30, 1937 -- ___-                               _____--____               12, 237, 816. 87
       Total cost of permanent work to June 30, 1937_---- __-- 4, 508, 923. 76
Undistributed costs June 30, 1937----- __-___      _________--22, 522. 81
       Net total cost to June 30, 1937----------------------                                             4, 531, 446. 57
Plus accounts receivable June 30, 1937---                                                                        482. 54
                                                                                                            1------____70,
      Gross total costs to June 30, 1937______--___--____                                          -4,      701, 929. 11
Minus accounts payable June 30, 1937--------    ----  ___                                         -        188, 370. 23
       Net total expenditures________---_________--                                                  14,513, 558. 88
Jnexpended balance June 30, 1937-       ------------------                                  ---        6_03, 850. 97
             Total amount appropriated to June 30, 1937                       ----------             15, 117,409. 85

         Fiscal year ending June 30            1933           1934           1935             1936                1937


Cost of new work...---------  -----------     -------------- -------------------------                        $297, 759. 30
                                  $74, 424. 59
Cost of maintenance ....-------.....---.          $97, 101.99     $79, 104. 64         $83, 031. 75             99, 919. 30

           Total cost.----------------74, 424. 59            97, 101. 99    79, 104. 64      83, 031. 75        397, 678. 60

'Total     expended--.. -------------         72, 985. 01    96, 965. 06   130, 677. 58     169, 949. 27        260, 408. 42

Allotted---------------------137, 116. 49                  149, 718. 49    93, 000. 00   1, 103, 000. 00     -148,    000. 00


Balance unexpended July 1, 1936__------------------------                                            $1,012,259.39
Deductions on account of revocation of allotment------ ------                                           148, 000. 00
              Net amount to be accounted for ___                             _                              864, 259. 39
cross        amount expended- .-------------------                          $1, 124, 788.31
Less :
     Reimbursements collected ------                        $863, 179. 89
     Receipts from sales _------                             - 1, 200. 00
                                                                                    864, 379. 89
                                                                                                            260, 408. 42

  Balance unexpended June 30, 1937       -__                                                                603, 850. 97
  Outstanding liabilities June 30, 1937_________                                 $188, 370. 23
  Amount covered by uncompleted contracts------                                   549, 809. 53
                                                                                                             vv,. , 179.
                                                                                                            738.     ..... 76


Balance available June 30, 1937_----                         -..- ______-    -__---                     -- 134, 328. 79
Accounts receivable June 30, 1937----                             __________----____                       170, 482. 54

              Unobligated balance available June 30, 1937--------                                           - 36, 153. 75
         1Includes     $402,241.74 from permanent indefinite appropriation.
             RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                                                                           1165
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------                                                                 $307, 000.00

        Balance available for fiscal year 1938-----------------                                                            343, 153.75

Amount (estimated) required to be appropriated for completion
   of existing project      2----------------                                                                          1, 317, 000.00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: - - - -- - - - -     - - - - - - - -- - -- ------ ------ ------
   For new work                                                                                                            882, 000. 00
                                       .
   For maintenance 2          --------                        -           -                                                 81, 000. 00
                --- --- ---- --- --- -                                        -
        Total 2 _96.-------                         ----                          --------                                 963, 000. 00
   2 Exclusive of available funds.


                                            EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937-----------------------$182, 825. 77
Cost of maintenance to June 30, 1937------------ ------------------- ----
      Total cost of permanent work to June 30, 1937-----------                                                             182, 825. 77
Net total expenditures---------   --------------------------                                                               182, 825. 77
Total amount appropriated to June 30, 1937----------------                                                                 182,825. 77

   Fiscal year ending June 30                    1933                    1934                1935               1936            1937


Cost of new work___------                       _------------_-------------   -------------- $121,089. 57       $61, 736. 20
Cost of maintenance ---         --   -------------              ------------- -------------- -------------- --------------
Total expended----------------------                           -------------- --------------                101, 807.33         81, 018.44
Allotted--------------------------------------------                                         $215, 000                     -32,174.     23


Balance unexpended July 1, 19368__----------------------------- $113, 192.67
Deductions on account of revocation of allotment--------- ------- 32, 174. 23

      Net amount to be accounted for------------------------                                                                81, 018. 44
Gross amount expended-------------------------$81,183. 44
Less reimbursements collected-----------------------  165. 00
                                                                                                                            81, 018. 44

  CONSOLIDATED COST AND FINANCIAL SUMMARY FOR KEWEENAW WATERWAY, MICH.

Cost of new work to June 30, 1937------------------------$2, 453, 932. 66
Cost of maintenance to June 30, 1937 ---------------------- 2, 237, 816. 87

      Total cost of permanent work to June 30, 1937 ---------- 4, 691, 749. 53
Undistributed costs June 30, 1937----------------------------      22, 522. 81
      Net total cost to June 30, 1937-----------------------4, 714, 272.34
Plus accounts receivable June 30, 1937-----------------------  170, 482. 54
     Gross total costs to June 30, 1937----------------------                                                          4, 884, 754. 88
Minus accounts payable June 30, 1937-----------------------                                                               188, 370. 23
     Net total expenditures  ---------------------------- 14, 696, 384. 65
Unexpended balance June 30, 1937--------------------------    603, 850. 97
        Total amount appropriated to June 30. 1937                                                   _------------     5,300, 235. 62
  1 Includes $402,241.74 from permanent indefinite appropriation.
1166           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


    Fiscal year ending June 30                 1933                  1934          1935              1936               1937


Cost of new work.........................._____         _......___________ _.      ._...._       $121, 089. 57       $359, 495. 50
Cost of maintenance-............           $74, 424. 59         $97, 101. 99  $79, 104. 64         83, 031. 75         99, 919. 30
      Total cost----------...............    74, 424. 59           97, 101. 99    79, 104. 64     204, 121. 32         459, 414.80

Total expended----------------               72, 985. 11           96, 965. 06   130, 677. 58     271, 756. 60         341, 426.86

Allotted........---------------__           137, 116.49            149, 718.49   308, 000. 00   1, 103, 000. 00      -180,   174. 23


Balance unexpended July 1, 1936-----------------------------$1, 125, 452.06
Deductions on account of revocation of allotment                 80, 174. 23
                                                                1--------------
      Net amount to be accounted for-------------------------                                                      945, 277. 83
Gross amount expended------------------------$1, 205, 971. 75
Less:
    Reimbursements collected------- $863, 344. 89
    Receipts from sales                  , 200. 00
                                       1-------------
                                                      864, 544. 89
                                                                                                                   341, 426. 86

      Balance unexpended June 30, 1937 ----------------------                                                      603, 850. 97
Outstanding liabilities June 30, 1937-- -----------         $188, 370. 23
Amount covered by uncompleted contracts---------- 549, 809. 53
                                                                                                                   738, 179. 76
      Balance available June 30, 1937------------------------     -- 134, 328. 79
Accounts receivable June 30, 1937------------- ------------------    170, 482. 54

Unobligated balance available June 30, 1937--------------------                                                     36, 153. 75

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_---------------------------------                                                          307, 000. 00

          Balance available for fiscal year 1938--------------------                                               343, 153. 75

Amount (estimated) -required     to be appropriated for completion
                       -- --- -- --- -- --- -- -- -- --- -- -- -- --- -- --- -
of existing project 21                                                                                           , 317, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939: 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                -
   For new work                                                                                                    882, 000.00
                      - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - -
   For maintenance 2                                                                                                81, 000. 00

         Total 2                            --------------------                                                  963, 000. 00
   2 Exclusive of available funds.

                                    7. PRESQUE ISLE HARBOR, MICH.

   Location.-This harbor (formerly known as Marquette Bay, Har-
bor of Refuge, Mich.), situated on the south shore of Lake Superior
within the city limits of Marquette and about 3 miles distant from
Marquette Harbor, is about 11/2 miles long and one-half mile wide
and is protected by a breakwater. It is an indentation in the shore
behind Presque Isle Point. (See U. S. Lake Survey Chart No. 935.)
   Existing project.-This provides for a 2,816-foot breakwater off
Presque Isle Point consisting of 216 feet of shore connection, 1,000
feet of stone-filled timber cribs, and 1,600 feet of rubble-mound sec-
tion; and dredging the harbor to a depth of 26 feet in the inner por-
tion, with 28 feet at the entrance, both depths referred to low-water
datum for Lake Superior, which is 601.6 feet above mean tide at New
York. The harbor is subjected to fluctuations of water level, not
          RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                          1167
exceeding 2 feet, due to wind and barometric conditions and to an-
nual variations of about 1 foot.
   The estimate of cost for new work revised in 1935 is $705,000. The
latest (1935) 'approved estimate of cost for annual maintenance is
$5,500.
   The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for a 1,000-foot break-
water off Presque Isle Point (H. Doc. No. 318, 54th Cong., 1st sess.);
act of June 13, 1902, provided for the 216-foot shore extension (An-
nual Report for 1903, pp. 474, 1823); act of August 30, 1935, pro-
vided for the dredging and the 1,600-foot rubble-mound extension to
the breakwater, and changed the designation of the project (H. Dec.
No. 473, 72d Cong., 2d sess.). The latest published map is in the
last-mentioned document.
   Terminal facilities.-There is one wharf for handling pig iron
and one ore dock. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-New work was done
consisting of dredging 285,977 cubic yards of material by contract,
from the harbor and entrance. The costs for dredging were $118,-
372.66 and the expenditures, $96,804.96, all for new work.
   Condition at end of fiscal year.-The existing project is about 25
percent completed, the work remaining to be done being the comple-
tion of the dredging and the construction of a 1,600-foot rubble
mound extension to the breakwater. The dredging work was about
75 percent completed on June 30, 1937. The completed portion of
the breakwater is in good condition. The controlling depth was 24
feet on June 30, 1937. The total cost was $283,292.26, of which
$173,429 was for new work and $109,863.26 for maintenance. The
total expenditures were $261,724.56.
   Proposed operations.-The balance unexpended June 30, 1937,
 $355,195.04, less revocation of $285,000 dated July 29, 1937, and in-
cluding allotment of $150,000 approved July 26, 1937, will be applied
to new work as follows:
New work :
   Accounts payable-----------------------------------------        $30, 722. 55
   Dredging harbor area by contract, July to September 1937____ 39, 105.42
   Constructing extension of 350 linear feet to the breakwater dur-
     ing April to June 1938 by contract________________________ 150, 367. 07

        Total---------------------------------         --                220, 195. 04
   New work consisting of constructing an additional 1,250-foot ex-
tension to the breakwater will be necessary. The additional sum of
$500,000 can be profitably expended during the fiscal year 1939 for
performing this work under contract.
                           Cost and financial summary

Cost of new work to June 30, 1937 __...____                 -_____-_____
                                                                       $173, 429.00
Cost of maintenance to June 30, 1937_____-----------            -__-____ 109, 863.26
      Total cost of permanent work to June 30, 1937_______          __   283, 292. 26
                                           --------
Undistributed costs June 30, 1937_--__-------                     ____     9, 154. 85
      Net total cost to June 30, 1937-----------_                        292, 447. 11

      20196-37--pt. 1-74
1168            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937___----- --------------                                                   - $30, 722. 55

     Net total expenditures-----------------------                                                              261, 724. 56
Unexpended balance June 30, 1937---------------------------                                                     355, 195. 04

           Total amount appropriated to June 30, 1937_ ------------                                             616, 919. 60

          Fiscal year ending June 30                       1933           1934          1935           1936            1937


Cost of new work..-----------------------
Cost of maintenance---        ...----
                                   .........--------
                                        -------------- $9, 972.86
                                                                  -----------------------         ------------ $118,372.66

Total expended.........-..-------------------                      --                ___
                                                                         9, 972. 86 -------       .           _----_ 96, 804.96
Allotted...................--------------------------   $10, 000. 00    $4, 972.86       $5,000       $295. 000      152, 000. 00


Balance unexpended July 1, 1936___________
                                       --                __---------- $300, 000. 00
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936------------------------------------               152,000. 00

      Amount to be accounted for __________-
                                           -------                452, 000. 00
Gross amount expended----------------------           $96,805. 27
Less reimbursements collected-_----------------------         .31
                                                                   96, 804. 96

      Balance unexpended June 30, 1937     ___------- ------- _                                                 355,195. 04
Outstanding liabilities June 30, 1937___ __      __     $30, 722. 55
Amount covered by uncompleted contracts-    ---     --   39,105. 42
                                                                                                                  69, 827. 97

     Balance available June 30, 1937 _____________------__    285, 367. 07
Accounts receivable June 30, 1937   ___________         ___ ______

     Unobligated balance available June 30, 1937_______________                                                285. 367. 07
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937, less revocation of funds made July 29,
1937-----        --------------------------------------                                                       135, 000.00
          Balance available for fiscal year 1938---------------                                                150, 367. 07

Amount (estimated) required to be appropriated for completion of
existing project 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -              500, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work1 -                 -                                     _
                                                    ___                            _, -                        500, 000. 00
  SExclusive of available funds.

                                   8. MARQUETTE HARBOR, MICH.

   Location.-This harbor is situated in Marquette Bay on the south
shore of Lake Superior, 160 miles west of Sault Ste. Marie, Mich.,
and 256 miles east from Duluth, Minn. (See U. S. Lake Survey
Chart No. 935.)
   Existing project.-This provides for a 4,500-foot breakwater, the
inner 3,000 feet of stone-filled timber cribs, and the outer 1,500 feet
of rubble-mound construction, and dredging the harbor basin to a
depth of 25 feet, giving a protected area of 350 acres. The project
depth is referred to low-water datum for Lake Superior, which is
601.6 feet above mean tide at New York. This harbor is subject to
very marked undertow, with a consequent fluctuation during storms,
amounting at times to 21/2 feet. The annual fluctuation is about
1 foot.
          RIVERS AND HARBORS-DULUTH,              MINN., DISTRICT           1169

   The estimate of cost for new work, revised in 1935, was $1,307,200.
The latest (1935) approved estimate of cost for annual maintenance
is $6,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1867, provided for a 2,000-foot
breakwater (H. Doc. No. 56, 39th Cong., 2d sess., and Annual Re-
port for 1866, pp. 8 and 77); act of August 11, 1888, provided for a
1,000-foot extension of the breakwater (Annual Report for 1889
pp. 272 and 2021); act of June 25, 1910, provided for an additional
1,500-foot extension of the breakwater and for the removal of a
shoal in the northerly part of the harbor (H. Doc. No. 573, 61st
Cong., 2d sess.); and the deepening of the harbor basin to 25 feet
was authorized by the Pablic Works Administration September 6,
1933, and adopted by the River and Harbor Act of August 30, 1935
 (Rivers and Harbors Committee Document No. 20, 72d Cong., 1st
sess.). The latest published map is in the last-mentioned document.
   Terminal facilities.-These consist of one ore dock, one coal dock,
three old wharves slightly used, and one freight and passenger wharf.
   There are also several small fish wharves without railroad con-
nections. The facilities are considered adequate for existing com-
merce.
   Operations and results during fiscal year.-Maintenance repairs
to the concrete-capped portion of the breakwater, consisting of patch-
ing and resurfacing, were made during August and September
1936.
   The costs and expenditures were $2,116.30, all for maintenance
repairs to the breakwater.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935 at a saving of $189,888 under the estimated cost. The
concrete-covered breakwater was completed in the fiscal year 1905,
the rubble-mound portion of the breakwater in 1922, and the dredg-
ing in 1935. The rubble-mound portion of the breakwater is in
good condition, but patching and resurfacing are necessary on a
portion of the concrete-capped breakwater. The controlling depth
in the harbor is 25 feet.
   The costs and expenditures were $1,117,311.56 for new work, and
$311,232.94 for maintenance, a total of $1,428,544.50, including
$72,188.05 Public Works funds for new work.
   Proposed operations.-No funds were available June 30, 1937.
The allotment of $5,000 made during July 1937 will be applied to
maintenance repairs by hired labor to the rubble-mound breakwater
with U. S. derrick boat Coleman during fiscal year 1938.
   The additional sum of $5,000 can be profitably expended during
the fiscal year 1939 for maintenance repairs to the rubble-mound
breakwater with U. S. derrick boat Coleman during fiscal year 1939.
                         Cost and financial summary

Cost of new work to June 30, 1937-------------___-----__           $1, 117, 311. 56
Cost of maintenance to June 30, 1937----------------------______       311, 232. 94
      Total cost of permanent work to June 30, 1937---------        1, 428, 544. 50
Net total expenditures--------__           -        -     -         1, 428, 544. 50
      Total amount appropriated to June 30, 1937 -------------      1, 428, 544. 50
1170           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30                   1933           1934           1935            1936          1937


Cost of new work-----     --------------------------               $4, 801.84      $67, 386. 21 ----------------------
Cost of maintenance--___----------------- $21, 580. 79             12, 205. 11 -----------------------          $2, 116. 30

      Total cost-    _---------------------         21, 580. 79    17, 006. 95   67, 386. 21                      2,116.30

Total expended.............----------------------   21, 569. 28    16, 181. 65   68, 238. 22    ------------      2, 116. 30

Allotted--_---      ------------------------        24, 429. 44   104, 200. 00     7, 988. 05     -$25, 700     -2, 827. 24


Balance unexpended July 1, 1936 _____-_________________--                                                     $4, 943. 54
Deductions on account of revocation of allotment---------------                                                2, 827. 24

      Net amount to be accounted for _____-________________                                                    2, 116. 30
Gross amount expended-------------------------------------                                                     2,116. 30
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937-----------------------------------                                                    5, 000. 00
Balance available for fiscal year 1938---------------------------                                              5, 000. 00
Amount that can be profitably expended          in fiscal year ending
                                   -- - -- - - -- - -- - - -- - -- - - -- - -- - --
  June 30, 1939, for maintenance                                                                               5, 000.00
   1 Exclusive of available funds.

                    9. GRAND MARAIS HARBOR OF REFUGE, MICH.

   Location.-The harbor is situated on the south shore of Lake
Superior, 314 miles east of Duluth, Minn., and 93 miles west of Sault
Ste. Marie, Mich. (See U. S. Lake Survey Chart No. 9.)
   Existing project.-This provides for parallel timber-crib piers 500
feet apart-aggregate length 3,450 feet--extending out to a depth
in the lake of 22 feet at ordinary low water; for closing the natural
entrance by a pile dike 5,770 feet long; and for dredging a channel
300 feet wide and 18 feet deep between the piers, and 500 feet wide
and 20 feet deep at the lake approach. The project depth is referred
to low-water datum for Lake Superior, which is 601.6 feet above
mean tide at New York. The ordinary variation of water level
extends from 0 to +1 foot above low-water datum.
   The estimate of cost for new work, revised in 1894, is $484,000.
The latest (1918) approved estimate for annual maintenance is
$15,000.
   The existing project, except for the pile dike, was adopted by the
River and Harbor Act of June 14, 1880, pursuant to which plans
were approved by the Secretary of War August 5, 1881 (Annual
Report for 1881, p. 2050). The project was extended in 1894 to pro-
vide for the pile dike (Annual Report for 1895, p. 351). For the
latest published map see House Document No. 1286, Sixty-fourth
Congress, first session.
   Terminal facilities.-There is no rail connection with the harbor.
There are two fish wharves and one general-merchandise wharf. The
facilities are considered adequate for present needs.
   Operations and results during fiscal year.-Repairs were made to
the east and west piers by Government plant and hired labor, con-
sisting of replacing broken and missing deck planking and placing
crib-fill stone.
   The costs were $5,497.80, and the expenditures, $3,208.86, all for
maintenance.
   Condition at end of fiscal year.-The existing project is 85 percent
completed. Parallel piers were built 500 feet apart, 1,912 and 1,545
             RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                                              1171
feet long, respectively, and a pile revetment 100 feet long at the in-
ner end of each pier; a channel 250 feet wide and 18 feet deep was
dredged between the piers from the lake to the bay; and a pile dike
was built in 1895-97 to close the natural entrance 5,770 feet in width.
The piers are in fair condition, except for need of scattered repairs.
The timber portion of the pile dike is in poor condition and the
stone protection has settled. The controlling depth in the channel
is 16 feet, as shown by a survey of May 1937. To complete
the project there remains to construct 193 linear feet of crib piers
and dredging to widen the inner portion of the channel, now 250 feet
wide, to the project width of 300 feet. This work is not considered
necessary to meet present requirements of navigation.
    The costs were $355,885.29 for new work and $409,947.70 for mainte-
nance, a total of $765,832.99. The total expenditures were
$763,544.05.
    Proposed operations.-The balance unexpended June 30, 1937,
together with an allotment of $800 and revocation of $798.14 made
during July 1937, will be applied to maintenance as follows:
Accounts payable--                                                   $-------------------------
                                                                    $3,  163. 17
Pile dike, repairs by hired labor during July and August 1937------- 5, 629. 83
        Total--- -----------------------------------------------                                  8, 793. 00
  No work is contemplated during the fiscal year 1939, therefore no
funds can be profitably expended.
                                 Cost and financial summary
Cost of new work to June 30, 1937--------------------------                                 $355, 885. 29
Cost of maintenance to June 30, 1937---------------------------                              409, 947. 70

      Total cost of permanent work to June 30, 1937------ ------  765, 832. 99
Minus accounts payable June 30, 1937---------------- ------------   2, 288. 94

     Net total expenditures-----------------------------------763, 544. 05
Unexpended balance June 30, 1937-------------------------------   8,791. 14

        Total amount appropriated to June 30, 1937----------------772, 335. 19

        Fiscal year ending June 30             1933       1934          1935        1936             1937


Cost ofnew work ............--.--              -      -     -
Cost of maintenance-------------- --------------          991. 31                  --
                                                                                  -$9,              $5, 497. 80
Total expended--------------     -   -------------    9, 991. 31            -3,          _-----        208.86
Allotted---....-------------------------              9, 991.31---.-$12,1                  000

Balance unexpended July 1, 1936--------- ----------------------                               $12, 000.00
Gross amount expended-----------------------------    $4, 131. 64
Less reimbursements collected------------------------     922. 78
                                                                                                  3, 208. 86

      Balance unexpended June 30, 1937-------------------------  _                                8,791.14
Outstanding liabilities June 30, 1937-----------------------------                                3, 163. 17
        Balance available June 30, 1937--------------------------                                 5, 627.97
1172      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount revoked July 1, 1937_-------------------------        $798. 14
Amount alloted from War Department Civil Appropriation
Act approved July 19, 1937                                    800. 00
                                                                                $1. 86

       Balance available for fiscal year 1938----------------------        5, 629. 83

Amount (estimated) required to be appropriated for completion of
existing project 1                                                            000. 00
                                                                         1-------------------------------
  1Exclusive of available funds.

                 10. WARROAD HARBOR AND RIVER, MINN.

   Location.-Warroad Harbor and River are at the southwestern
extremity of Lake of the Woods, 36 miles west of the mouth of
Rainy River. (See U. S. Lake Survey Chart No. 842, Lake of the
Woods.)
   Existing project.-This provides for dredging and maintaining a
channel 8 feet deep from the landing at Warroad to deep water in
the lake, the channel being 9,200 feet long, 200 feet wide within the
harbor, and 300 feet wide out in the lake; for a turning basin 500
by 900 feet to a depth of 8 feet; and for a pile-brush-stone jetty on
the north side of the channel extending from the shore 700 feet into
the lake. The project depth is referred to low-water datum, for Lake
of the Woods, which is 1,056 feet above mean tide at New York.
This depth corresponds to a depth of 10 feet on Lake Survey Chart
No. 842 of this locality.
   The estimate of cost for new work, revised in 1928, is $118,000.
The latest (1928) approved estimate of cost for annual maintenance
is $10,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1899, and modified by the following river and harbor acts:
June 6, 1900, June 13, 1902 (H. Doc. No. 92, 56th Cong., 2d sess.),
March 3, 1905, June 25, 1910 (H. Doc. No. 703, 61st Cong., 2d sess.),
and July 25, 1912. The latest published map is opposite page 1984
in the Annual Report for 1911.
   Recommended modifications of project.-Under date of June 24,
1926, the Chief of Engineers recommended that the project be cur-
tailed by reducing the channel width to 100 feet and the turning
basin to 250 feet. (H. Doc. No. 467, 69th Cong., 1st sess.)
   Terninal facilities.-A pile and plank wharf 80 feet in length has
been provided by the village of Warroad for free use by the public.
Two commercial companies' fish wharves 60 feet in length are not
open to the public. These wharves are served by spur tracks. There
are also a number of minor wharves.
   These facilities are ample for the needs of existing commerce.
   Operations and results during fiscal year.-Preliminary work in
connection with maintenance dredging was done at a cost of $1,555.22.
The total expenditures during the year were $3,415.77.
   Condition at end of fiscal year.-The project as a whole is 76 per-
cent completed. The protective jetty was completed in 1910 and
reconstructed as a rubble mound in 1929. It is in good condition.
The turning basin at the Warroad wharves was completed in 1911,
and a channel 200 feet wide and 8 feet deep was completed in 1915.
The controlling depth in the channel in May 1937 was 8 feet below
low-water datum, which is 1,056 feet above mean tide level at New
              RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                                                             1173
York, for a least width of 100 feet. Annual maintenance is neces-
sary. The shore revetment is in need of minor repairs.
  The work to be done to complete that part of the existing project
outside of the present used dredging lines consists of widening the
lake channel from 200 to 300 feet for a distance of 7,460 feet. This
has not been done, as the additional width is not necessary to meet
present requirements.
  The total costs of the existing project at the end of the fiscal year
were $83,805.36          for new work and $235,284.92 for maintenance,                                                       a
total of $319,090.28. The total expenditures were $368,331.11.
  Proposed operations.-The balance unexpended June 30, 1937,
together with allotment of $8,000 and revocation of $3,000 made
during July 1937, will be applied to maintenance as follows:
Accounts payable-------------------- -------------- --------  ----  $957. 62
Dredging with U. S. pipe-line dredge Traverse during June 1938____ 6, 312.38
Repairs to revetment by hired labor during June 1938_-------------
                                                                __ 2, 000. 00

        Total---------------------------------------------------                                                  9, 270. 00
  The additional sum of $5,000 can be profitably expended during
the fiscal year 1939 for maintenance dredging with U. S. pipe-line
dredge Traverse during May and June 1939.
                                     Cost and financial summary
Cost of new work to June 30, 1937------------------------------$83, 805.36
Cost of maintenance to June 30, 1937--------------------------   235,284.92
      Total cost of permanent work to June 30, 1937-------------319, 090. 28
Undistributed costs June 30, 1937--------------------------------49, 718. 59
        Net total cost to June 30, 1937___---------------                                                       368, 808.87
Minus accounts payable June 30, 1937----------------------------                                                    477. 76
      Net total expenditures ---------------------------         368, 331. 11
Unexpended balance June 30, 1937--------------------------------   4, 270. 00
        Total amount appropriated to June 30, 1937----------_-                                             _ 372, 601.11

       Fiscal year ending June 30                     1933          1934               1935         1936            1937


Cost of new work -.....----   -.-       ,-- -i,-      ----- ,ii- ....-    i, - ........
Cost of maintenance-----------------$25, 523. 03 $16, 865. 02 $6,211. 69 $1, 356. 78 $1, 555. 22
Total expended--         __----------------------   17, 335. 90   10, 373. 71        10, 099. 83   2, 392. 33        3, 415. 77
Allotted....---------------------------             22, 903. 10   23, 898.01         15, 000. 00   5, 000. 00     -19, 000. 00

Balance unexpended July 1, 1936__--------------____________ $26. 685.77
Deductions on account of revocation of allotment---------------- 19, 000. 00
      Net amount to be accounted for--      ________-___                                                          7, 685. 77
Gross amount expended----------------________            $3, 610. 67
Less reimbursements collected-------------------------       194.90
                                                                                                                  3, 415. 77
        Balance unexpended June 30, 1937-----------_                                                              4, 270. 00
Outstanding liabilities June 30, 1937-_                                                                             957. 62
        Balance available June 30, 1937 ---                                    -3,                                  312. 38
1174            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount revoked July 1, 1937_____________-_____-______                                                 $3,000. 00
Amount allotted from War Department Civil Appropria-
tion Act approved July 19, 1937______________________                                                8, 000. 00
                                                                                                                             $5, 000. 00
     Amount available for fiscal year 1938_____________________                                                               8, 312. 38
Amount (estimated) required to be appropriated for completion
of existing project 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                 34,000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1_________________________________ _                                                               5, 000. 00

    11. EXAMINATIONS,                         SURVEYS AND CONTINGENCIES                                       (GENERAL)

   The cost of work during the year amounted to $21,562.93, the ex-
penditures were $20,990.49. The balance unexpended June 30, 1937,
$2,316.39, together with an allotment of $23,000 made during July,
1937, or a total of $25,316.39, will be applied as needed during the
fiscal year 1938 to payment of expenses incurred under this heading.
The additional sum of $23,000 can be profitably expended during
the fiscal year 1939.
                                              Cost and financial summary

Cost of new work to June 30, 1937_______________
Cost of maintenance to June 30, 1937 _-------------------                                                               $224, 272. 06

      Total cost of permanent work to June 30, 1937------------                                                         224, 272. 06
Minus accounts payable June 30, 1937--------------------------                                                            1, 556. 49
     Net total expenditures-----------             -    -                                                    -              222, 715. 57
Unexpended balance June 30, 1937_----------------------                                                                       2, 316. 39
           Total amount appropriated to June 30, 1937____________ _                                                     225, 031.96

           Fiscal year ending June 30                        1933               1934           1935              1936            1937


Cost of new work ..........................                                     .      .       - -_        __           _
Cost of maintenance-..-_ _....---------                 -$22, 485. 61        $36, 698.97    $24, 275. 22   $24, 267.98         $21, 562. 93
Total expended------......-----------.-.--                22, 495. 19         36, 128. 02    23, 323. 70    24, 976. 88         20, 990. 49
Allotted--...-----..-.-.-.-..--.
                   ,                              ---     23, 130. 95         59, 291. 68    22, 000. 00    23, 000. 00        ..........

Balance unexpended July 1, 1936------- --------                                                                             $23, 306. 88
Gross amount expended ----------------                                                             $38, 646. 91
Less reimbursements collected ---------------                                                       17, 656. 42
                                                                                                                             20, 990. 49
      Balance unexpended June 30, 1937                                   _____----------___--2,                        316. 39
Outstanding liabilities June 30, 1937--                                                                ---------    1, 081.43
                                                                                                             __--------------
     Balance available June 30, 1937                                 234. 96
                                                                  1-----------------------,
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------------------------------------- 23, 000. 00

    Balance available for fiscal year 1938 -------------------
                                              __                                                                             24, 234. 96
Amount that can be profitably expended in fiscal year ending June
                                                    _
   30, 1939, for maintenance 1---__                            -----------                                                  23, 000. 00
   1 Exclusive of available funds.
               RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                                                                  1175
12. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                    [Commercial statistics for these projects are given in pt. 2 of report]

                                                                     For last full   Cost and expenditures to          Estimated
                                                                     report see            June 30, 1937               amount re-
                 Name of project                                       annual                                           quired to
                                                                       report                                           complete
                                                                        for-         New work        Maintenance        co

Agate Bay Harbor, Minn.---------------------           1935                          $282, 461.98     $225, 549. 21     Completed.
Port Wing Harbor, Wis.1 __----------------------1932
                                  1- - - - - - - - - -                                 48, 355. 23      62, 436. 77         $8, 200
Baudette Harbor and River, Minn.                .          _             1934           4, 524.68       12, 542. 13     Completed.

  1 Channels adequate        for commerce.

            13. PLANT ALLOTMENT FOR DULUTH, MINN., DISTRICT
                                            Cost and financial summary
Undistributed costs June 30, 1937------------------------------   $462, 903. 45
Plus accounts receivable June 30, 1937---------------------------   17, 675. 81
       Gross total costs to June 30, 1937------------------------   480, 579. 26
Minus accounts payable June 30, 1937---------------------------     12, 131. 36
       Net total expenditures------------------------------------   468, 447.90
Unexpended balance June 30, 1937-----------------------------       13, 823.34
       Total amount appropriated to June 30, 1937--------------- 482, 271.24

   Fiscal year ending June 30                       1933                1934            1935              1936            1937

Total expended--...----         _        ......---- _ _._...
                                                       -------
                                                       __$441,858.                             49      $21, 957. 60       $4, 631.81

Allotted _______         -           .                              --....
                                                       .-------------.                469, 167. 91      13, 103. 33


Balance unexpended July 1, 1936------------------------------         $18, 455.15
Gross amount expended----------------------------       $258, 437. 76
Less:
    Reimbursements collected----------- $253, 564. 05
    Receipts from sales -----------------       241. 90
                                                         253, 805. 95
                                                                        4, 631.81
Balance. unexpended June 30, 1937         -                            1----------____
                                                                       13, 823.° 34
Outstanding liabilities June 30, 1937_____________________________ 16, 352. 72
Balance available June 30, 1937----------------------------------2, 529. 38
Accounts receivable June 30, 1937-------------------------------17,        675. 81
      Unobligated balance available June 30, 1937----------------      15, 146. 43
Status of reports called for by river and harbor acts and committee resolutions
                                                                      Date trans-
         Locality                   Authorization act                 mitted to                Doc. No.               Recommenda-
                                                                       Congress                                           tion

Bete Grise Bay, Mich.__- River and Harbor Act, Nov. 7, 1937     _________-------------------___   Unfavorable.
                           Aug. 30, 1935.
Black River and at .... do----------------         do---- ------------------------                   Do.
  Little Girls Point
  (Ohmans Creek),
  Gogebic County,
  Mich., at mouth of.
Grand Traverse Bay, _...do-.             _   .Nov.  20,1936 ..............-----------------------    Do.
  Mich.
Siskiwit River, Wis ..__ Senate     Committee Apr. 1, 1937 Senate                Committee Favorable.
                          resolution, Jan. 18,                   print, 75th Cong.,
                           1936.                                 1st sess.
Tobacco River near River and Harbor Act, Nov. 20, 1936 .......................
  Gay, Mich., at mouth    Aug. 30, 1935.
of harbor of refuge.
1176       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          MILWAUKEE, WIS., DISTRICT
   This district includes the rivers and harbors in the States of
Michigan and Wisconsin on the west shore of Lake Michigan, con-
stituting the original Milwaukee district, and the harbors along the
east shore of Lake Michigan, in the State of Michigan, to the Straits
of Mackinac, and thence along the north shore to Seul Choix Point
Lighthouse, including the waters draining into this part of Lake
Michigan, constituting the former Grand Rapids, Mich., district.
   District engineer: Lt. Col. H. M. Trippe, Corps of Engineers, to
September 30, 1936. Lt. Col. W. H. Holcombe, Corps of Engineers,
since that date.
   Division engineer: Col. L. V. Frazier, Corps of Engineers.
                                    IMPROVEMENTS

                                      Page                                      Page
1. Manistique Harbor, Mich__'       1176 14.   South Haven Harbor, Mich_       1228
2. Menominee     Harbor     and          20.   Saugatuck Harbor and Kala-
      River, Mich. and Wis - - -     1178         mazoo River, Mich .....       1230
3. Pensaukee Harbor, Wis ....       1181 21.   Holland Harbor, Mich __-__      1233
4. Big Suamico River, Wis ---       1182 22.   Grand Haven Harbor and
5. Green Bay Harbor, Wis --         1183         Grand River, Mich .....       1235
6. Fox River, Wis__                 1188 23.   Muskegon Harbor, Mich ___       1239
7. Harbors at Washington Is-             24.   White Lake Harbor, Mich__       1241
      land, Wis_                     1194 25.   Pentwater Harbor, Mich ___      1243
8. Sturgeon Bay and Lake                 26.   Ludington Harbor, Mich __       1245
       Michigan Ship Canal, Wis_     1195 27.   Manistee Harbor, Mich ----      1248
9. Algoma Harbor, Wis ......        1199 28.   Portage Lake Harbor, Mich_      1251
10. Kewaunee Harbor, Wis ....        1201 29.   Frankfort Harbor, Mich ---      1252
11. Two Rivers Harbor, Wis .         1205 30.   Leland Harbor, Mich ......      1255
12. Manitowoc Harbor, Wis ---        1207 31.   Charlevoix Harbor, Mich __      1257
13. Sheboygan Harbor, Wis ---        1211 32.   Grays Reef Passage, Mich _      1259
14. Port Washington Harbor,               33.   Examinations, surveys, and
        Wis_                         1213         contingencies (general)_ _-   1260
15.   Milwaukee Harbor, Wis - - -    1216 34.   Other projects for which no
16.   Racine Harbor, Wis .......     1219         estimates are submitted.--    1261
17.   Kenosha Harbor, Wis .....      1222 35.   Plant allotment_    ..    .     1261
18.   St. Joseph Harbor, Mich ...    1225

                      1. MANISTIQUE          HARBOR, MICH.

   Location.-This harbor is on the north shore of Lake Michigan,
about 135 miles northeasterly from Green Bay Harbor and 220 miles
northerly from Milwaukee. (See U. S. Lake Survey Chart No. 71.)
  Previous projects.-Adopted by River and Harbor Act of June
14, 1880. The cost and expenditures prior to commencement of
work under the existing project in 1905 were $3,955.05 for new work.
For further details see page 1933 of Annual Report for 1915.
  Existing project.-This provides for two breakwaters extending
from the shore on either side of the mouth of the Manistique River,
1,744 and 1,480 feet in length for the east and west breakwaters,
respectively, and for a channel 18 feet deep except where rock is
encountered at less depth. This channel extends from that depth
in the lake up the river a distance of 1,650 feet from its mouth,
having a total length of 3,200 feet from the outer end in the lake
and varies in width from 180 to 475 feet, the west side at the river
mouth being protected by a revetment 375 feet long. The break-
waters are formed of stone-filled piling and timber cribs, capped
        RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                  1177

with concrete superstructure; the revetment is formed of stone-filled
plank cribs.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluc-
tuations of water level are seasonal changes of about one-half foot
above or below the annual mean stage and extreme fluctuations of
a temporary nature, due to wind and barometric pressure, of about
11/ feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1908, was $338,462,
exclusive of amounts expended on previous projects.      The latest
 (1917) approved estimate for annual cost of maintenance is $5,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the break-
waters and outer harbor (H. Doc. No. 429, 58th Cong., 2d sess.).
The act of March 2, 1907, provided for the present location of the
west breakwater and the present channel dimensions (approved by
the Secretary of War Apr. 3, 1908, in an unpublished report of
Mar. 13, 1908).    For latest published map see annual report for
1908, page 1942.
   Local cooperation.-Fullycomplied with.
  Terminal facilities.-Besides a car-ferry slip there are two coal
and building material wharves, two fishing wharves, and numerous
lumberyard slips. While these facilities are considered fairly ade-
quate for existing commerce, it is believed that a wharf, with rail
connection and under public control, should be provided.
   Operations and results during fiscal year.-Operationsconsisted of
dredging 6,962 cubic yards, by hired labor and use of Government
plant, for restoration of project depth at a total cost of $6,500.23 for
maintenance. The total net expenditures were $6,275.53.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1917 at a saving of $31,210 under the estimated cost. The
breakwaters enclosing the basin and the dredging of the channel to
18 feet depth below low water datum over practically all the area
below the car-ferry slip were completed in 1915. The channel above
the slip was dredged to ledge rock in 1917, thereby completing the
project. The plank crib revetment was completed in 1909. The
piers and breakwater are in generally good condition. The super-
structure of the plank crib revetment is in a very dilapidated con-
dition, but immediate repairs thereto are not considered necessary,
as it is not essential to the preservation of the harbor. The con-
trolling depths at low water datum at the close of the fiscal year were
17.2 feet at the entrance, 17.5 feet over the full width of channel
through the outer basin and in the river to the car-ferry slip, thence
decreasing to about 16.0 feet over a width of about 50 feet along the
west revetment to the lumber-yard slips. The costs under the exist-
ing project are $307,252.18 for new work and $94,126.05 for mainte-
nance, a total of $401,378.23. The total expenditures are $401,343.45.
   Proposed operations.-The balance unexpended, together with an
allotment of $8,000, and a revocation of $200, made during July, will
be applied as follows:
Accounts payable June 30, 1937             _---
                                         _-_-__________---------     $34. 78
Maintenance: Operation of U. S. hopper dredge Meade, about June
1938 --                     -_-_--______-- _-_--___--       ___ 8,000. 00
     Total-------                       _-_______
                                    -------               ____-    8,034. 78
1178          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $8,500 can be profitably
expended during the fiscal year ending June 30, 1939, in maintenance
operation of U. S. hopper dredge Meade during the spring of 1939.
                                       Cost and financial summary
Cost of new work to June 30, 1937____________        _____________                                                $311, 207. 23
Cost of maintenance to June 30, 1937 ----------------------------                                                   94, 126. 05
      Total cost of permanent work to June 30, 1937-                                                               405, 333. 28
Minus accounts payable June 30, 1937_____--
                                      --    __________________                                                           34. 78
        Net total expenditures                           -----                ____-_____                           405, 298. 50
Unexpended balance June 30, 1937                                                                                          34. 78
                                                                                                                         2--------------------------

         Total amount appropriated to June 30, 1937 ----__-____                                              _     405, 533. 28

        Fiscal year ending June 30                    1933             1934            1935                1936           1937

Cost ofnew w ork .-- -
Cost of maintenance
                                 ..-.---   __---
                                   - - - - -
                           ..----------------
                                             - - -           - - -
                                                    $9,475. 22
                                                                      -_
                                                                       -   -   --
                                                                     $4, 927. 00
                                                                                     - -      _
                                                                                    $10, 809. 86
                                                                                                    -----   $87. 69
                                                                                                                             ...-
                                                                                                                          ..--
                                                                                                                         $6, 500. 2
Total expended        ......--------------------     9, 326. 68       6, 017. 58      7, 693. 43          2,679. 56       6, 275. 53
Allotted---       -                                 15, 000. 00
                                   _ __------------------------       7,400. 00      10, 500. 00     -3, 900. 00          3, 000.00


Balance unexpended July 1, 1936---------------------- ----------                                                      $3, 510. 31
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_                                                                                                  6, 000.   00

      Amount to be accounted for    -----------------------------                                                      9, 510. 31
Deductions on account of revocation of allotment_--__
                                                   --     _____-3,                                                        000. 00

      Net amount to be accounted for----                  --                                                            , 510. 31
                                                                                                                       6--------
Gross amount expended_-------------------------------------                                                            6, 275. 53
      Balance unexpended June 30, 1937             ------                                                                234. 78
Outstanding liabilities June 30, 1937__-_
                                      ----------- ___                                              -34.                       78

         Amount revoked in July 1937 ---------------------------                                                         200. 00

Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--------------------------------------                                                            8, 000. 00
      Balance available for fiscal year 1938_______-_----------                                                        8, 000. 00
Amount-that can be profitably- - expended      in fiscal year ending June
                                 - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - -                          8, 500. 00
30, 1939, for maintenance
1 Exclusive of available funds.

              2. MENOMINEE HARBOR AND RIVER, MICH. AND WIS.

  Location.-On the west shore of Green Bay, distant about 49 miles
northeasterly from Green Bay Harbor, and about 155 miles from
Milwaukee via Sturgeon Bay Canal. (See U. S. Lake Survey Chart
No. 723.)
  Previous projects.--Priorto 1902 the harbor and river constituted
two works.
  Harbor: River and Harbor Acts of March 3, 1871, September 19,
1890, and March 3, 1899; the amount expended was $200,471.67 for
new work, $33,811.10 for maintenance, a total of $234,282.77.
  River: River and Harbor Acts of September 19, 1890, July 13,
1892, and June 3, 1896; the amount expended was $111,951.63 for new
work, $2,382.49 for maintenance, a total of $114,334.12.
       RIVERS AND HARBORS-MILWAUKEE,          WIS., DISTRICT    1179
   The cost and expenditures on harbor and river prior to commence-
ment of work under existing project in 1902 were $312,423.30 for
new work, $36,193.59 for maintenance, a total of $348,616.89. (For
further details see p. 1933 of Annual Report for 1915.)
   Existing project.-This provides for protecting the mouth of the
river by parallel piers 400 feet apart and about 1,870 feet and 2,681
feet in length for the north and south piers, respectively, and for a
channel 21 feet deep from that depth in the bay to the upper end of
the Marinette municipal wharf, about 4,700 feet above the Ogden
Street Bridge, and 10,700 feet from the outer end in the bay where
the width is 600 feet, reducing to 300 feet between the piers and up
to Ogden Street Bridge, thence 200 feet in the river to the upper end
of the channel, with an enlarged turning basin 21 feet deep on south
side of the channel just below the municipal wharf. Except for 168
feet of concrete caissons at outer end of south pier, the piers are
formed of stone-filled piling and timber cribs, the entire north pier
and 1,276 feet of the south pier having been repaired with concrete
superstructure and 801 feet of the south pier repaired with rubble
superstructure.
   The project depths are referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressures, of
about 11/2 feet above or below the mean lake level prevailing at the
time.
   The estimate of cost for new work, revised in 1935, is $163,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $10,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1871, provided for the entrance
piers (annual report for 1867, p. 132); act of June 13, 1902, consoli-
dated the project for the harbor and river and authorized a channel
18 feet deep (H. Doc. No. 419, 56th Cong., 1st sess.); act of March
4., 1913, partially restored the work above the bridge which had been
eliminated by the act of March 3, 1905, and the act of July 3, 1930,
provided for 20-foot depth in the channel and 18-foot depth in the
turning basin (H. Doc. No. 171, 70th Cong., 1st sess.), and the act
of August 30, 1935, provided for the present project depths of the
channel and the turning basin and for enlargement of the turning
basin (Rivers and Harbors Committee Doc. No. 28, 73d Cong., 2d
sess.). The latest published map is in the last-mentioned document.
   Local cooperation.-Fully complied with.
    Terminal facilities.-Besides a car-ferry slip, there are numerous
wharves for handling coal, building materials, and miscellaneous
commodities. The city -of Marinette has provided a public wharf.
The facilities are considered fairly adequate for existing commerce,
except that there is need for a public wharf owned by the city of
Menominee with warehouse and railway connection.
    Operations and results during fiscal year.-Operations consisted
of taking soundings, by hired labor and use of Government plant,
at a total cost of $1,073.74 for maintenance. The total net expendi-
tures were $1,658.36.
1180       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Condition at end of fiscal year.--The project in effect prior to the
modification of August 30, 1935, was completed in 1931 at a saving
of $27,327 under the estimated cost. The entrance piers were com-
pleted in 1884 and the dredging under the old project in 1931. No
work has been done on the last modification of the project, providing
for deepening the channel and basin to 21-foot depth, and enlarging
the turning basin. The inner 654 feet of the north pier and 604 feet
of the south pier are no longer essential for the preservation of the
channel, and these piers are therefore maintained only for lengths
of about 1,216 and 2,077 feet, respectively.
   The controlling depth at low water datum at the close of the fiscal
year was 20 feet in the channel to the Marinette municipal wharf
and in the turning basin. The river is available for rafting and
logging for about 102 miles above its mouth. The costs under the
existing project are $79,472.59 for new work and $290,446.59 for
maintenance, a total of $369,919.18. The total expenditures are
$372,243.47.
   Proposed operations.-The balance unexpended, together with
allotments of $101,500 made during July 1937, less a revocation of
$1,800, will be applied as follows:
Accounts payable June 30, 1937---------------------------                             $28. 65
New work: Deepening entrance channel and enlarging and deepen-
  ing turning basin all to 21 feet, by contract during the summer
  and fall of 1938 -----------------             --------------------             83, 000. 00
Maintenance:
    Operation of U. S. dipper        dredge Kewaunee, about
      August-September 1937--------------------- --- $15, 537. 06
    Riprap and fill piers with United States plant, 1,000
      tons, at $3, during the fall of 1937--------------      3, 000. 00
                                                                                  18, 537. 06

       Grand total----------------------------------------                       101, 565.71
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $18,500 can be profitably
expended during the fiscal year ending June 30, 1939, as follows:
Maintenance:
   Operation of U. S. dipper dredge Kewaunee, fall of 1938--------     $15, 500
   Riprap piers, 1,000 tons at $3, with United States plant during the
      fall of 1938--_----_ ------------------------                      3, 000

         Total-----              ---------------------------------------             18, 500

                                 Cost and financial summary

Cost of new work to Jiune 30, 1937-----------------------------                 $391, 895. 89
Cost of maintenance to June 30, 1937-------------------------                    326, 640. 18

      Total cost of permanent work to June 30, 1937- ---------                   718, 536.07
Undistributed costs June 30, 1937------------------------------                    2, 352. 94

     Net total cost to June 30, 1937-------------------------                    720, 889. 01
Minus accounts payable June 30, 1937---------------------------                        28. 65

     Net total expenditures--------------------------------                      720, 860.36
Unexpended balance June 30, 1937--------------------- -----                        1, 865. 71

       Total amount appropriated to June 30, 1937---- --                   --    722, 726. 07
             RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                  1181

   Fiscal year ending June 30               1933           1934           1935          1936              1937


Cost of new work-------------------------------                                   ----------------------
Cost of maintenance -----------.           $9, 884. 37   $12, 018. 86   $18, 665. 21   $9, 445. 80        $1, 073. 74

Total expended....---------------10, 373.05               11, 924. 76    15, 825. 97   13, 630. 13         1, 658. 36

Allotted .....--------------------          1, 800.00     27, 250. 00    18, 000. 00    8, 700. 00      -10, 500.00


Balance unexpended July 1, 1936 ________--___------------                                            $14, 024. 07
Deductions on account of revocation of allotment-------                                                0, 500. 00
                                                                                                      1----------
      Net amount to be accounted fr--------------------                                                3, 524. 07
Gross amount expended                                                                                   , 658. 36
                                                                                                       1-----------------------------
      Balance unexpended June 30, 1937 ------------------------                                        1, 865. 71
Outstanding liabilities June 30, 1937----------------------------                                          28. 65
     Balance available June 30, 1937---------------------                                             11, 837. 06
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 --------------------------------------                                       101, 500. 00
          Balance available for fiscal year 1938__                                                   103, 337. 06
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 2-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - _              18, 500. 00
   1 Includes $1,800 revoked in July 1937.
   2 Exclusive of available funds.

                                   3. PENSAUKEE HARBOR, WIS.

    Location.-On the west shore of Green Bay, distant about 22 miles
northeasterly from Green Bay Harbor, and about 33 miles south-
westerly from Menominee Harbor, Mich. and Wis. (See U. S. Lake
Survey Chart No. 72.)
    Previous projects.-Adopted by River and Harbor Act of August
2, 1882. This project was never completed and was abandoned by
the River and Harbor Act of June 13, 1902. The costs and expendi-
tures prior to commencement of work under the existing project
were $9,184.20 for new work and $6,777.03 for maintenance, a total
of $15,961.23. For further details see Annual Report for 1899, page
2734.
    Existing project.-This provides for an entrance channel 100 feet
wide and 8 feet deep at low-water datum from that depth in Green
Bay to the mouth of Pensaukee River, a distance of about 4,300 feet.
    The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of
about 2 feet above. or below the mean lake level prevailing at the
time.
    The estimate of cost for new work, made in 1937, is $31,500, ex-
clusive of amounts expended under previous projects. The latest
  (1937) approved estimate for annual cost of maintenance is $1,500.
    The existing project was authorized by the River and Harbor
Act of August 26, 1937 (H. Doc., No. 478, 74th Cong. 2d sess.). The
latest published map is in the project document.
    Terminal facilities.-These consist of small private wharves, lo-
cated along the lower half mile of the river, used by the local fishing
1182     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

interests. Ample space is available for additional fishing wharves
whenever they are required. The facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project. The controlling depths at low water datum at the
close of the fiscal year were about 3 feet in a narrow winding ditch
through the bar at the entrance and about 4 feet in the river. There
have been no costs or expenditures on the existing project.
   Proposed operations.-The entrance channel should be provided as
soon as funds are made available. 'Fhe sum of $31,500 can be profit-
ably expended during the fiscal year ending June 30, 1939, to be. ap-
plied to dredging an entrance channel 100 feet wide and 8 feet deep,
by contract, summer and fall of 1938.
                         Cost and financial summary

Cost of new work to June 30, 1937--------------------------------$9, 184. 20
Cost of maintenance to June 30, 1937------------------------------6, 777. 03
       Total cost of permanent work to June 30, 1937-------------       15,961.23
Net total expenditures--                                                    961.23
                                                                        1------------------------------
Total amount appropriated to June 30, 1937                                  961.23
                                                                        1-----------------------5,
Amount (estimated) required to be appropriated for completion of ex-
  isting project ------------------------------------------------       31, 500. 00
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work__                                                  31 500. 00

                      4. BIG SUAMICO RIVER, WIS.

   Location.-This is a small stream which flows in an easterly direc-
tion into Green Bay, an arm of Lake Michigan. The mouth of the
river is about 8 miles northeasterly from Green Bay Harbor, and
about 44 miles southwesterly from Menominee Harbor, Mich. and
Wis. (See U. S. Lake Survey Chart No. 72.)
   Existing project.-This provides for an entrance channel 8 feet
deep at low water datum from that depth in Green Bay to a point
1,800 feet above the river mouth, with widths of 100 feet in the bay
and 60 feet in the river, the total length of channel being about
3,700 feet.
   The project depth is referred to low-water datum for Lake Mich-
igan, which is taken at 578.5 feet above mean tide at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure, of
about 3 feet above or below the mean lake level prevailing at the
time.
   The estimate of cost for new work, made in 1937, is $20,000. The
latest (1937) approved estimate for annual cost of maintenance is
$1,500.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 498, 74th Cong., 2d sess.). The
latest published map is in the project document.
   Terminal facilities.-These consist of small private wharves, lo-
cated along the lower 11/2 miles of the river, used by the local fishing
interests. Ample space is available for additional fishing wharves
        RIVERS AND HARBORS--MILWAUKEE,              WIS., DISTRICT      1183
whenever they are required. The facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project. The controlling depths at low-water datum at the
close of the fiscal year were 5 feet in the entrance channel and 41/2
feet in the lower 0.4 mile of the river and 21/2 feet in the next 1.2
miles. There have been no costs or expenditures on the existing
project.
   Proposed operations.-The entrance channel should be provided as
soon as funds are made available. The sum of $20,000 can be profit-
ably expended during the fiscal year ending June 30, 1939, to be ap-
plied to dredging an entrance channel 8 feet deep with widths of 100
feet in the bay and 60 feet in the river, by contract, summer and
fall of 1938.
                         Cost and financial summary
Total amount appropriated to June 30, 1937___------------------------------
Amount (estimated) required to be appropriated for completion of ex-
  isting project------------   -------------------------------------- $20, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work---------------------------------------------20, 000

                       5. GREEN BAY HARBOR, WIS.

   Location.-Located at the mouth of the Fox River, at the head of
Green Bay, distant about 180 miles from Milwaukee, Wis., via
Sturgeon Bay Canal, and about 49 miles southwesterly from Me-
nominee Harbor, Mich. and Wis. (See U. S. Lake Survey Chart
No. 725.)
   Previous projects.-Adopted by River and Harbor Act of June
23, 1866. This project was modified by the following river and har-
bor acts: June 23, 1874, July 13, 1892, and June 3, 1896. The cost
and expenditures prior to commencement of work under the exist-
ing project in 1897 were $396,974.49 for new work, $8,918.19 for
maintenance, a total of $405,892.68. For further details see page
1934 of Annual Report of 1915.
   Existing project.-This provides for an outer channel in Green
Bay about 10 miles long and 22 feet deep, from that depth in the
bay to the mouth of the river, varying in width from 500 feet at
the outer end to 300 feet at the river mouth, including widening of
the bend outside of Tail Point Light; the portion through Grassy
Island, about 700 feet long, being protected on the east side by a
timber revetment capped with concrete superstructure; straightening
from the inner end of Grassy Island to the river mouth; for widen-
ing the channel in Fox River through the city of Green Bay by the
removal of shoals at the mouth of East River and between the two
upper railroad bridges to a depth of 22 feet; for a turning basin
20 feet deep above the Chicago & North Western Railway bridge
near the upper limits of the city of Green Bay; for an inner channel
in the river about 31/2 miles long and 18 feet deep, from that depth
in the river at the southerly limits of the city of Green Bay to De
Pere, having a width of 150 feet; and for a turning basin 18 feet
deep at the upper end of the inner channel for turning 500-foot
vessels.
       20196-37-pt. 1-75
1184    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluc-
tuations of a temporary nature, due to wind and barometric pressure,
of about 21/ feet above or below the mean level prevailing at the
time.
   The estimate of cost for new work for the entire project, revised in
1937, is $1,684,000, exclusive of amounts expended on previous proj-
ects but including $70,000 contributed by local interests. The latest
 (1937) approved estimate for annual cost of maintenance for the
entire project is $28,500.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1866, provided for the revetment
at Grassy Island (Annual Report for 1867, p. 70); the act of June 3,
1896, provided for the inner channel (unpublished report .approved
July 11, 1896); the act of June 25, 1910, provided for the turning
basin (H. Doc. No. 522, 61st Cong., 2d sess.) ; the act of August 8,
1917, provided that the improvement of Green Bay Harbor should
include the maintenance of the turning basin at De Pere (H. Doc
No. 1017, 64th Cong., 1st sess.) ; the act of March 3, 1925, provided
for increasing depth.of inner channel and turning basin to 18 feet
 (H. Doc. No. 294, 68th Cong., 1st sess.); deepening the outer channel
to 22 feet and widening and straightening it inside of Tail Point
Bend and widening the channel in the city of Green Bay was author.
ized by the Public Works Administration January 3, 1934, and
adopted by the act of August 30, 1935 (Rivers and Harbors Com-
mittee Document No. 40, 72d Cong., 1st sess.) : the act of August 26.
1937, provided for the turning basin above the Chicago & North
Western Railway bridge (Rivers and Harbors Committee Doc. No.
73, 74th Cong., 2d sess.). For latest published maps see House
Document No. 294, Sixty-eighth Congress, first session; Rivers and
Harbors Committee Document No. 40, Seventy-second Congress, first
session, and Rivers and Harbors Committee Document No. 73, Sev.
enty-fourth Congress, second session.
  Local cooperation.-Fully complied with.
   Terminal facilities.-There are numerous wharves for the handling
of coal, petroleum products, grain, pulpwood, wood pulp, sulphur,
cement, building materials, and miscellaneous commodities located
on this waterway. Green Bay has provided a municipal wharf open
to the public. These facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year-Regular funds.-Oper-
ations consisted of dredging, by hired labor and use of Government
plant, 72,400 cubic yards from the inner channel and turning basin
for restoration of project depth at a cost of $22,122.31. Dredging
69,553 cubic yards, by contract, from the outer channel in Green
Bay to provide new project width and depth of 22 feet, cost $28,-
137.29. The total cost was $50,259.60 of which $28,137.29 was for
new work and $22,122.31 for maintenance. The total net expendi-
tures were $43,917.57.
  Public Works funds.-Operations consisted of completing, by con-
tract, the dredging of the outer channel in Green Bay from a point
2,000 feet south of Grassy Island to the outer end of the channel to
        RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                      1185

provide new project width and depth of 22 feet. A total of 918,739
cubic yards were removed at a total cost of $261,784.12 for new work.
The total net expenditures were $323,045.33. The total costs, all
funds, were $312,043.72, of which $289,921.41 was for new work and
$22,122.31 for maintenance. The total net expenditures were $366,-
962.90.
  Condition at end of fiscal year.-The project in effect prior to the
modification of August 26, 1937, was completed in 1936, at a saving
of $6,776 under the estimated cost. Deepening and widening the
outer channel was completed in 1936. The channel in Fox River
through the city of Green Bay was completed in 1935. The inner
channel and turning basin was completed in 1926. The east revet-
ment at Grassy Island, built in 1869, has been provided with concrete
superstructure and is in good condition. The west revetment was
removed in 1935. No work has been done on the last modification
of the project providing for dredging the turning basin above the
Chicago & North Western Railway bridge. The controlling depth at
low-water datum at the close of the fiscal year was 22 feet in the outer
channel and in the channel through city of Green Bay, and 18 feet in
the inner channel, including the turning basin at De Pere. The head
of deep-water navigation is at De Pere. The costs under the existing
project from regular funds are $645,424.20 for new work and $391,-
956.55 for maintenance, a total of $1,037,380.75. The total expendi-
tures are $1,031,190.64. The costs and expenditures under the exist-
ing project from Public Works funds are $940,800 for new work. The
total costs, all funds, are $1,978,180.75, of which $1,586,224.20 was for
new work and $391,956.55 for maintenance. The total expenditures
are $1,971,990.64. In addition, $70,000 contributed funds were
expended on new work.
  Proposed operations.-The balance unexpended, together with an
allotment of $30,000 for maintenance on July 20, 1937, will be applied
as follows:
Accounts payable June 30, 1937-------------------------------    $6, 190. 11
Maintenance :
    Operation of U. S. dipper dredges Depere and Kewaunee, about
      July-October 1937, and May-June 1938----------------------34, 642. 12

            Total-----------------------------------------------       40, 832.23
  The turning basin above the Chicago & North Western Railway
bridge should be provided as soon as funds are made available.
Dredging is required annually for maintenance of project dimensions
of channel. The additional sum of $61,500 can be profitably ex-
pended during the fiscal year ending June 30, 1939, as follows:
New work :
   Dredging turning basin above the Chicago & North Western Rail-
      way bridge to 20-foot depth, by contract, during summer and
      fall of 1938--------------------------------------------    $27, 000
Maintenance:
    Operations of U. S. dipper dredges Depere and Kcwanee, summer
      and fall of 1938 and spring of 1939_        -         _      _      34, 500
       Total_                                    -_   _ _ _-_-            61, 500
1186           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                     Cost and financial summary
                              MAINTEINANCE            AND          IMPROVEMENT FUNI7D


Cost of new work to June 30, 1937_________________--                                                                 -                $1,042,398. 69
Cost of maintenance to June 30, 1937---------------------                                                                                400, 874. 74

Minus
           Total cost of permanent work to June 30, 1937     _
           accounts payable June 30, 1937-------------------------
                                                                                                        ---                              1, 443, 273. 43
                                                                                                                                                6,190. 11
     Net total expenditures -----------------------------
                                 _                        _                                                                           1 4&7, 083 32
Unexpended balance June 30, 1937 ----------------------------                                                                            10, 832.23.
           Total amount appropriated to June 30, 1937__________--                                                                 - 1, 447, 915. 55

           Fiscal year ending June 30                      1933                   1934                   1935,                    1936             1937
                                                                                                                                                 $25.13.2


,Cost
,Cost of new work__..____
      of maintenance___                           $22, 771. 08
                                                                         .....................................
                                                                         $16, 343.49 $15, 458. 73 $24, 167. 83
                                                                                                               $28,137.29
                                                                                                                22,122. 31

        Total cost----   ---------                  22, 771. 08               16, 343.49               15, 458. 73            24, 167. 83         50, 259..60
Total expended...._____                              17, 193. 43              18, 371. 55              15, 075. 57            26, 068. 32         43, 917. 57
                                                :                 ., ,       ,:     .. :   :       :             L   ,.           .
Allotted     ----------------------------           19, 812. 24              43, 050. 00               16, 000.00             19,.000. 00         30, 500.00
                                                                                               I                         r                  1




Balance unexpended July 1, 1936__0                                       -               _____
                                                                                         --                                                $24, 249.80;
Amount allotted from War Department Appropriation Act ap-
proved May 15, 193 _--------------------                                                                                                   35, 000. 00

           Amount to be accounted for__----------------------                                                                               59, 249. 80
Deductions on account of revocation of allotment -                                                          --           -                      4, 500. 00

      Net amount to be accounted for_-                                                                                                      54, 749. 80
Gross amount expended--------------------------                                                        $49, 385. 36
Less reimbursements collected -------------------                                                        5, 467. 79
                                                                                                                                            43, 917. 57

      Balance unexpended June 30, 1937--------------------                                                                                  10, 832. 23
Outstanding liabilities June 30, 1937________--    _____                                                                     --              6, 190. 11

     Balance available June 30, 1937                   __                                                                                       4, 642. 12
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------                                                                                30, 000. 00
     Balance available for fiscal year 1938_                                                                                                34, 642. 12
Amount (estimated) required to be appropriated for completion
   of existing project 2-----------------                                                                                                   27, 000. 00

Amount that can be profitably expended in fiscal year ending
  June 30, 1939:
        For new work 2_                                                                        -------                                      27, 000. 00
        For maintenance       2         -   ------------                                                                 -                  34, 500. 00

        Total 2-----------                        ---------                                                                                 61, 500. 00
   1Exclusive of $70,000 expended from contributed funds.
   2Exclusive of available funds.

                                            PUBLIO WORKS FUNDS

Cost of new work to June 30, 1937____________________________--                                                                                $940, 800
Cost of maintenance to June 30. 1937                                    __              ________                     ____--
           Total cost of permanent work to June 30, 1937                                                             _____                       940, 800
Net total expenditures --   ---------               -------                                                                                      940, 800
Total amount appropriated to June 30, 1937______________________                                                                                 940, 800
                RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                                   1187

     Fiscal year ending June 30                    1933                1934               1935              1936             1937


Cost of new work           __     -______.....__---------- ____ _         _            $158,239.23      $520, 776. 65      $261, 784. 12
Cost ofmaintenance--                --       ---------                             - --------                           --------------
Total expended----------------------------                           $3,660.61          107, 682. 40     506, 411. 66       323, 045. 35
Allotted---------------------------------625,                            000. 00       339,000.00        -23, 200.00


Balance unexpended July 1, 1936 __    -  _____-              _ $323,045.33
Gross amount expended ___ __ __      -_____-____-$323, 825. 45
Less reimbursements collected-----------      __   --  780. 12
                                                                323, 045. 33
        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR GREEN BAY HARBOR, WIS.

Cost of new work to June 30, 1937----- ------  ___________ 1$1, 983, 198. 69
Cost of maintenance to June 30, 1937------------------------    400, 874. 74
      Total cost of permanent work to June 30, 1937                                                                 2, 384, 073. 43
Minus accounts payable June 30, 1937-___________________
                                            ---                                                                          6, 190. 11
     Net total expenditures__---     -    -  __--____                                                         12, 377, 883. 32
Unexpended balance June 30, 1937------------       __                                                     -____    10, 832. 23
            Total amount appropriated to June 30, 1937------------                                                 2, 388, 715. 55

     Fiscal year ending June 30                    1933               1934                1935             1936              1937


Cost of new work__......._______________      ...
                                               ___                      __            $158,239.23       $520, 776. 65      $289, 921. 41
Cost of maintenance ....------------ $22, 771. 08                   $16, 343. 49        15, 458. 73       24, 167. 83        22, 122. 31

        Total cost - -----                        22, 771. 08        16, 343. 49       173, 697. 96      544, 944.48        312, 043. 72

Total expended...-----------------                17, 193. 43        22, 032. 16       122, 757. 97      532,479.98         366, 962. 90

Allotted----------------------_                   19, 812. 24       668, 050. 00       355, 000.00       -4,200.00           30, 500.00


Balance unexpended July 1, 1936-----------------------------$347, 295. 13
Amount allotted from War Department Appropriation Act approved
  May 15, 1936__-------------------                      ----- 35,000. 00
      Amount to be accounted for------------------------------                                                          382, 295. 13
Deductions on account of revocation of allotment                                                                          4,500. 00

      Net amount to be accounted for----------------                                                                    377, 795. 13
Gross amount expended ________________________     $373, 210. 81
Less reimbursements collected_----_-------------                                                       6, 247. 91
                                                                                                                        366, 962. 90
      Balance unexpended June 30, 1937_-___---___--___-                                                             -___10, 832. 23
Outstanding liabilities June 30, 1937------------__                                                                      6,190.11
     Balance available June 30, 1937______________________                                                                4,642. 12
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------------                                                           30, 000. 00

            Balance available for fiscal year 1938                                             --
                                                                                   _________________                     34, 642. 12

Amount (estimated) required to be appropriated for completion of
   existing project 2________-________                                                                                  27, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939:
   For new work 2--------------------------------------------                                                            27, 000.00
   For maintenance 2-                                        --                                                          34, 500. 00
                 --------- -----      --- --- -- --- --- ---                               --- -- --- -- ----
        Total 2_ ____                                                                                                    61.500. 00
   1 Exclusive of $70,000 expended from contributed funds.
    SExclusive of available funds.
1188       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                     6. FOX RIVER, WIS.
   Location.-This river rises in Columbia County, Wis., and flows in
a northerly direction into Green Bay. Its length is about 176 miles.
The Wolf River, physically the main river but by designation a
tributary of the Fox, rises in the central part of Forest County, Wis.,
and flows in a southerly direction about 220 miles into the Fox River
10 miles above Oshkosh.
   Previous projects.-As provided by special act of July 7, 1870,
and River and Harbor Act of June 10, 1872. The original project
was modified by the River and Harbor Act of March 3, 1873. The
cost and expenditures thereunder prior to commencement of the
existing project in 1886 were $3,239,909.63 for new work, of which
$591,161.39 was spent solely on the Wisconsin River. The improve-
ment of the Wisconsin River was abandoned in 1887 (Annual Report
for 1887, p. 2096). (For further details see p. 1940 of Annual Re-
port for 1915.)
   Ecxisting project.-This provides for deepening and widening the
channel of Fox River from De Pere, 7 miles above the mouth, to
Portage, Wis., a total length of 156 miles, the depth between De Pere
and Montello, 125 miles, to be 6 feet, with 9.6 feet in rock cut below
De Pere lock and 7 feet in other rock cuts on the lower river below
Menasha lock; and from Montello to Portage, 31 miles, the depth
to be 4 feet; the width of channel from Lake Winnebago to Montello
to be 100 feet, with necessary widening at bends; for the construction
and reconstruction of 27 locks and 16 dams; for a concrete retaining
wall at Kaukauna; for construction and maintenance of harbors hav-
ing depths of 6 feet on Lake Winnebago; for widening Neenah
Channel to 100 feet, with a 6-foot depth for a length of about 1 mile;
and for dredging, snagging, and otherwise improving Wolf River
from its mouth to New London, a distance of 47 miles, the depth to
be 4 feet. All depths are referred to standard low water.
   Ordinary and extreme fluctuations of water level above and below
mean stages on various parts of the improvement, due to floods and
other causes, are about as follows:

                                                                         Ordinary            Extreme
                                                                       fluctuations        fluctuations
                               Place
                                                                      Above     Below     Above     Below
                                                                      mean      mean      mean      mean
                                                                       stage    stage     stage     stage

                                                                       Feet      Feet      Feet     Feet
Lower Fox River at De Pere Dam __-_______-____________________           1.0       1.4       2. 5     4. 0
Lake Winnebago...... -------------------------                           1. 2      1. 3      2. 2      3. 7
Upper Fox River at Berlin Dam-_ .---------    _____    -___.___.- _      2. 7      1.4       5. 7      2. 0
Wolf River at New London   ___....   ..---. __--.-___.--   ____-         5. 0     2. 6       8. 8      3. 0



  The estimated cost of new work, revised in 1928, is $1,398,000 for
the upper river and $635,000 for the lower river; total, $2,033,000,
exclusive of the amounts expended on previous projects. The latest
(1928) approved estimate for annual cost of maintenance is $20,000
for the upper river if project dimensions are once fully obtained and
$110,000 for the lower river; total, $130,000. The estimate of annual
cost of operation and care of the locks and dams made in 1936 is
$100,000.
       RIVERS AND HARBORS-MILWAUKEE,          WIS., DISTRICT    1189
   The existing project was authorized by the following river and
harbor acts: The act of. August 5, 1886, provided for improvement
of the Fox River (plan of a board approved Dec. 10, 1884, as modi-
fied by the Chief of Engineers May 14, 1886, annual report for
1885, pp. 2041-2045); act of September 19, 1890, provided for
dredging Fond du Lac Harbor on Lake Winnebago (annual report
for 1890, pp. 2389-2394) ; act of June 3, 1896, provided for improve-
ment of the Wolf River (without prior survey or estimate); the
acts of June 3, 1896, June 13, 1902, and March 2, 1907, provided
for improvement of Stockbridge, of Calumet and Miller Bay, and of
Brothertown Harbors, on Lake Winnebago (without prior surveys or
estimates); the act of March 3, 1925, provided for increasing the
depths in rock cuts on the lower river, for widening Neenah Chan-
nel, and for concrete retaining wall at Kaukauna (H. Doc. No. 294,
68th Cong., 1st sess.). Operation and care of the locks and dams
were included in the project July 1, 1935, under the provisions of
the Permanent Appropriations Repeal Act approved June 26, 1934.
For the latest published maps see House Document No. 146, Sixty-
seventh Congress, second session, and House Document No. 294,
Sixty-eighth Congress, first session.
                                                                                                  Locks and dams, Fox River, Wis.                                                                                                                                                 I ,
                                                                                                                                                                                                                                                                                  C




                                                                                                                                                                Depth at
                                                       Dis-                                                                                                    normal pool
                                                      tance                        Dis-                   Clear               Avail-                                               Character                                                  Date of
           Name of lock or dam                        from           Nearest town tance                                        able             Lift                               of founda-        Kind of       Type of construc-                           Actual
                                                                                                          width                                                                                       dam                tion                 comple-           cost
                                                      Green                                                                  length                       Breast Lower
                                                                                                                                                                                      tion                                                      tion                                  0
                                                       Bay
                                                                                                                                                          wall 1 miter                                                                                                                O
                                                                                                                                                                  sill
                                                                iI                         I      -                   -I-                  i                                                    I              1                          1      -      1.1
                                                                                                                                                                                                                                                                                      y
                                                      Miles                                    Miles        Feet                 Feet           Feet           Feet        Feet
De Pere lock 2____________ -........
                              . ..                       7. 1 De Pere ..-                                    36. 0               146. 0          8. 9           10. 3      12. 0   Rock .....                    Concrete --......             1936           $229,   307.   79
                                                                                                                                                                                                                                                                                      O
De Pere Dam 2_____________-.
                          --... ....                     7.2  -- do --                                                                                                             __do -----       Fixed 3 4__ . - --do -..-..
                                                                                                                                                                                                                              --               1929            209,   536.   08       H
Little Kaukauna lock 2            -                    13. 0 -. do_ _                              6            36. 6            137. 6            7. 2           8. 0      7. 4     Clay .....               Composite       5.......         1896              8,   986.   52
Little Kaukauna Dam 2________________                  13. 1 .....do -----                         6                                                                                 Clay and                 Piles and concrete_              1926            179,   397.   62
                                                                                                                                                                                        gravel.        4                                                                              O
Rapide Croche lock 2___________________                19. 2         Wrightstown_                  2            36. 0            146. 0            8. 3           8.8                Rock ___   Fixed 3 ___ Concrete ..           ...... 1934                                33
                                                                                                        ....-....
                                                                                                                                                                             9. 3                                                                              228, 738.
R ap id e Cro c h e Dam 2___
                          . __. __. _-. . . . .        19. 2             -.   -do_ ...-            2                                                                               ___do -.....              ___ do . .--------1930                            118, 975.     40
Kaukauna fifth lock 2_______-..........                22. 8          Kaukauna_                                 35.   6          144. 0          9. 1            6.7        8. 8     __do-..                  Co mp os ite -- .. . . 1898                       13, 309.     90
Kaukauna fourth lock 2....                             23. 1         .   do ....                                36.   6          144. 1         10. 2            6.9        6.0                              Stone masonry ..            1879                   37, 536.     37       z
                                                                                                                                                                                                                                                                                      0
Kaukauna third lock 2.................                 23. 2             .do _--.                               36.   6          144. 0         10. 2            6.9        6. 3   ___do
                                                                                                                                                                                   ---     . ..
                                                                                                                                                                                         o-----               - - do ...........         1879                   39, 948.     41
Kaukauna second lock 2_- --
Kaukauna first lock 2.            .        .--.....
                                                       23. 4
                                                       23. 6
                                                                      -- do __
                                                                     ____do .......
                                                                                                                35.
                                                                                                                35.
                                                                                                                      0
                                                                                                                      1
                                                                                                                                 144. 0
                                                                                                                                 144. 4
                                                                                                                                                 9.6
                                                                                                                                                11. 0
                                                                                                                                                                 6.0
                                                                                                                                                                 6.9
                                                                                                                                                                            6.0
                                                                                                                                                                            6.0
                                                                                                                                                                                     ___do -. ------------ I --do------------
                                                                                                                                                                                                                 -d o -.----    -- - -
                                                                                                                                                                                                                                         1903
                                                                                                                                                                                                                                         1883
                                                                                                                                                                                                                                                                24, 312.
                                                                                                                                                                                                                                                                38, 703.
                                                                                                                                                                                                                                                                             77
                                                                                                                                                                                                                                                                             52
                                                                                                                                                                                                                                                                                      z
                                                                          do .----.
                                                                       .....
Kaukauna Dam 2____________                             24. 0         .--. do ...
                                                                               _.
                                                                                                                                                                                   ___do___-_   Fixed 3
                                                                                                                                                                                                      34___ Concrete ---------           1931                  123, 763.     41
Kaukauna guard lock -   -              -               24. 0                                                    40. 0                                            9.4                   -do -_                Stone masonry -             1891                   12, 630.     30
Little Chute combined lock:                                                                                                                                                       -- do --
     Lower 2         -   -.......                       25. 4        Little Chute_                 1            35. 4            146. 5         10.9             6.0        8. 6 ._ do ......               -.- do ...........           1879
     Upper 2............................                25. 4            ....     -
                                                                            do _..-                1            36. 3            144. 1         10. 6            7. 6       6.0     Hardpan_                    ._d o---- _--- -         1879           }102, 303.82
Little Chute second lock 2                              26. 4         -. do _-- _-                              35. 0            144. 2         13. 8            8.0        6.2     Rock ... __ Fixed 2 4___ ...do _..........1881                              48, 555. 36
Little Chute first (guard) lock 2-....   .              26. 6         --    do .....                            35. 4                                            6.6               ___do ----                 ....do .       --......-- 1904                     7, 816. 56       h



Little Chute Dam 2 -           .                        26. 6        ---    do ......                                                                                              ___do -----               Concrete -----              1932                   82, 553. 74
Cedars lock2 ..                       .-                27. 3        -      do .-...               1            35. 0            144. 0           9.8            6.8        7. 3    _-do -----               Stone masonry ..            1888                   34, 972. 19       Ui2
Cedars Dam 2                                            27. 4               do ----..
                                                                          ....                     1                                                                               __do ....                 Concrete --------           1933                   84, 872. 55       F4l




Appleton fourth lock 2.-                                30. 7            Appleton ..-              1            35. 0            144. 0           7.6            8. 1       7.9    __-do ......              Stone masonry           -.  1907                   40, 892. 55       Z/
Appleton lower dam 2__________________                  30. 9               do _.._
                                                                          .....                                                                                                      __do -.. Fixed 3 ___-.  Concrete .--......          1934 .                 73, 902. 53
Appleton third lock 2__________________                 31. 3            -- - d o -__                           35.0             144. 0          8. 7            6.0        8. 6 ___do......                 Stone masonry ...           1900                   32, 238. 39
Appleton second lock 2 - -                              31. 6             .....
                                                                            do -....                            35. 1            144. 26         9. 6            6.9        6.0      Clay ..... Fixed 3___ -_ - do ............ 1901                            22, 939. 54
Appleton first lock 2   --------...........             31.9                do ......
                                                                         ....                                   35. 0            144. 7         10. 0            6.6        6.0      Rock .....                   do ...........
                                                                                                                                                                                                               ....-                     1884                   36, 004. 48
Appleton upper dam________________ __                   32. 2        .. ..do - --                                                                                                  ___do.-... Fixed 3 4_    .....do ... -.-...           1874                   60, 480. 69
Menasha lock 2                                          37. 0         Menasha --                                35. 4            144. O0           8. 5          7.2        8.0      Clay .....              Composite -.-...            1899                 s 19, 326. 46
Menasha Dam 2                                           37. 8                                                                    144. 6                                                                      Concrete .........
                                                                        ..do -.....
                                                                       -..                                                                                                          Hardpan__                                            1937                   84, 686. 04
Eureka lock                                             80. 9         Eureka -                     2            35. 7            148. 6            2.0           7.9       10. 1     Sand .....              Stone masonry ..            1876                   51, 127. 51
Eureka Dam -                                            80. 9        ... .do -                     22                                                                                Earth ....              Timber and plank_ 1877                             10, 276. 15
B erlin lock   -         ..                             89. 2         Berlin ------                 2           34. 8                              1.3           7.4        9.2      Clay__- -.              Stone masonry ...           1878                   44, 370. 98
Berlin Dam.._.---------.............                    89. 2        .....do -----                                                                                                  Earth _-.   Fixed 4      Timber cribs .....          1894                   14, 747. 14
White River lock....._                                  99. 2         Princeton___                 6            34. 5            148. 5            1.9           7.2       10. 7     Clay -...               Stone masonry ..            1878                   58, 709. 94
White River Dam          -....                          99. 2             do -----
                                                                      -....                        6                                                                                Earth ....  Fixed 4____ Timber cribs -....           1895                   17, 285. 64
Princeton lock ....                                    108. 6        -_- do ...                    3            34. 9            148. 4            1.5           7.3        9. 5     Sand-.--                Stone     masonry      -    1878                   51, 577. 84
Princeton Dam .-..            _                                                                                                                                                                 Fixed 4-__ Timber cribs .....
                                                       108. 6        --.-do            -
                                                                                    ..--           3    .....               ..    ....         .....      ..    . .    .           __.do .---                                            1898                   11,265. 69
Grand River lock_________.______._          129. 3 Montello__                34. 7   148.3    1. 4       6.4            9.8   Clay_--      __-      Stone masonry_       1878    56, 989. 43
Grand River Dam_______________              129. 3 __ do -                                                          .     . Clay and Fixed 34               ---. __
                                                                                                                                                    Timber cribs         1934    86, 912. 79
                                                                                                                               sand.
Montello lock 2                             132. 6       do __               35.3    137.0    3.8        4.8          5.7 Sand______                Composite ___.       1901    8 4, 889. 83
Montello Dam 2_                             132. 6 .    .do   -.    .                                     -     -   -      -do    -- - Fixed 4-     Timber cribs___      1933    6 6, 772, 55
Governor Bend lock 2_                       156. 7 Portage .-                35. 0   137.0    3.8       7 7.0         5. 2 -_do__                          _ ----- ---
                                                                                                                                                    .....do-             1931   830, 825. 38
Governor Bend Dam 2_                        156.7 [ _.. .do .....                                    --------------------      do__    Fixed          .. do . .....      1865      (6 8)
Fort Winnebago lock 2_______________        160. 9       do____-             34. 7   137.0    6. 4       5. 8         5. 6 Clay         ---------   Composite .- __      1936   621, 515. 46
Portage lock   2_                      _    163. 1         ..-.
                                                        ._-do                35. 2   146. 0   2. 3      10. 5         8.2    Sand_                  Concrete _____       1928   179, 604. 83


    1 Depth shown is on breast wall, which is controlling depth for upper pool.
    2 Original structure built prior to assumption of control by the United States on Sept. 18, 1872.
    3 Provided with sluices.
    4 Flush boards used.
    5 Being rebuilt in concrete.
    6 Partially rebuilt.
    7 Depth shown is on upper miter sill, which is controlling depth.                                                                                                                            rZ!
    8 Unknown.




                                                                                                                                                                                                I.
                                                                                                                                                                                                I,
1192     REPORT OF CHIEF OF ENGINEERS, U. S ARMY, 1937

   Recommended modifications of project.-Legislation authorizing
the abandonment of that part of the improvement of Wolf River
above Freemont and the upper Fox River from the mouth of the
Wolf to the Wisconsin River has been recommended in House Docu-
ment No. 146, Sixty-seventh Congress, second session.
   Terminal facilities.-The wharf and landing facilities are in gen-
eral adequate for the accommodation of existing commerce.
   Operations and results during fiscal year-Maintenance.-Opera-
tions consisted of dredging 44,810 cubic yards for restoration of
project depth above and below Wrightstown, below Kaukauna fourth
lock, at Drunkards Point, below Appleton fourth lock, and above
Appleton Upper Dam at a cost of $29,141.54. Removing snags and
shoals from various places along Wolf River cost $3,574.23. Repairs
of canal banks at places along lower and upper Fox River cost
$3,729.79. The construction of a new concrete lock at Little Kau-
kauna was commenced. The entire lock chamber floor and the left
lock wall, with the exception of the upper left gate wall section,
were constructed at a cost of $140,862.60. The removal of the old
timber crib dam and construction of a new concrete dam at Menasha,
by contract, cost $84,686.04. All work, except the construction of
Menasha Dam, was done by hired labor and use of Government plant.
The total cost of maintenance was $261,994.20.
   Operating and care.-Operations consisted of making necessary
repairs to locks, dams, canal banks, and lock houses, including re-
building of Fort Winnebago lock, at a cost of $38,650.24. The locks
and dams were operated in accordance with the existing project and
gages were read at a cost of $65,478.16. All work was done by hired
labor and use of Government plant. The total cost of operating
and care was $104,128.40. The total cost of all work was $366,122.60.
The total net expenditures were $366,733.95.
   Condition at end of fiscal year.-The existing project is about 44
percent completed (upper river, 25 percent; lower, 83 percent).
Twenty-two original locks and 9 original dams have been rebuilt; 5
additional locks and dams have been built by the United States.
 (See existing project for year of completion of each.) The struc-
tures and the dredging in pools have increased the original depths
generally about 2 feet. The controlling depths at mean low water
at the close of the fiscal year were as follows:
Fox River:                                                            Feet
    De Pere to Eureka lock_--- __-----------                         -6.0
    Eureka lock to 3 miles above Berlin lock----___----_______--____    4. 5
    3 miles above Berlin lock to Montello lock_____
                                                 ----            ____3. 5
    Montello lock to Governor Bend lock_______________________-____     2. 5
    Governor Bend lock to Portage lock___ _____________________------2.0
Wolf River:
    Mouth to 1 mile below Partridge Crop Lake-__ ________________-4. O0
                                                               -
    1 mile below Partridge Crop Lake to New London ___________---       2. 5
Harbors on Lake Winnebago_________________-____-_____                   5. 5
  The practicable drafts of vessels is about one-half foot less than
the controlling depths and prevail throughout the year except when
the rivers are frozen, usually from December 1 to April 1. The
head of navigation for boat traffic is New London on the Wolf River
and Portage on the upper Fox, except that during high water on
the Wisconsin River boats can proceed from Portage to the Missis-
sippi River. The work remaining to be done to complete the project
         RIVERS AND HARBORS-MILWAUKEE,                             WIS., DISTRICT     1193
is dredging in the upper Fox River and the upper portion of the
Wolf River; also rock removal and deepening Neenah Channel on
lower Fox River. Deepening Neenah Channel is no longer desired by
navigation interests. The remaining rock removal is not needed
unless there is a material increase in commerce. Additional dredg-
ing on the upper river is no longer considered necessary and is not
justifiable from an economic standpoint. The costs under the exist-
ing project are $871,724.01 for new work and $2,075,398.44 for main-
tenance including $176,346.27 for operating and care, a total of
$2,947,122.45. The total expenditures are $2,937,520.22. In addition,
the sum of $3,795,495.53 was expended between July 5, 1884, and
June 30, 1935, on the operating and care of the works of improvement
under the provision of the permanent indefinite appropriation for
such purposes.
  Proposedoperations.-The balance unexpended, including accounts
receivable, together with an allotment of $285,500, made during July,
will be applied as follows:
Accounts payable June 30, 1937-----------         ---------------- -- $25, 864. 69
Maintenance :
    Operation of U. S. dipper dredge Depere, summer
      and fall of 1937, and spring of 1938____---      __- $20, 500. 00
    Operation of U. S. bucket dredge Winneconne, sum-
      mer and fall of 1937, and spring of 1938 __,__        23, 279. 95
    Complete reconstruction of Little Kaukauna lock
      with United States plant, November 1937-May
      1938-------- ----------------------------            160, 000.00
                                                                        203, 779. 95
Operating and care:
    Operation of locks and dams and other works__ 69, 200. 00
    Ordinary maintenance and repairs--- ---------           27, 000.00
    Improvements and reconstruction, by hired labor__ 24, 000. 00
    Emergencies     ---------------------------------        1, 800. 00
                                                                        122, 000. 00

      'Grand total----         ---------------------------------               351, 644. 64
   Dredging is required annually for maintenance of project dimen-
sions of channel. The old upper dam at Appleton is in poor con-
dition and has insufficient flood-discharge capacity for the proper
regulation of Lake Winnebago. It should be rebuilt as soon as funds
are available. The completed locks and dams must be operated and
maintained. The additional sum of $371,500 can be profitably ex-
pended during the fiscal year ending June 30, 1939, as follows:
Maintenance :
    Operation of U. S. dipper dredge Depere, summer and fall of
      1938, and spring of 1939--------------------------------     $20, 400
    Operation of U. S. bucket dredge Winneconne, summer and fall
      of 1938, and spring of 1939-----------------------------      21, 500
    Reconstruction of Appleton upper dam, 655 linear feet at $320,
      by contract, during summer and fall of 1938 --------___   __ 209, 600

        Total for maintenance-------------------------------- 251,500
Operating and care:
   Operation of locks and dams and other works--------------    - 73, 000
   Ordinary maintenance and repairs--------------           __-  -__ 23, 000
   Improvements and reconstruction, by hired labor ___________   _ 22, 000
   Emergencies      -----------------      -----------                2,000

      Total for operating and care--------- -------                                 120, 000
      Grand total                -------------------------------                    371, 500
1194        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                          Cost and financial summary

Cost of new work to June 30, 1937------------------------                                                1 $4,111, 633.64
Cost of maintenance to June 30, 1937-------------------------                                              25, 870, 893. 97

      Total cost of permanent work to June 30, 1937----------                                                9, 982, 527.61
Undistributed costs June 30, 1937__--__----_ -----------------                                                   15, 981. 05

      Net total cost to June 30, 1937 ________--------------                                                 9, 998, 508. 66
Plus accounts receivable June 30, 1937______________---------                                                        281. 41

      Gross total costs to June 30, 1937--  ________---------9, 998, 790. 07
Minus accounts payable June 30, 1937___________-------------     25, 864. 69

        Net total expenditures---------------------- ----------                                              9, 972, 925. 38
Unexpended balance June 30. 1937                               ______--
                                                                   ---                               _            65, 863. 23

        Total amount appropriated to June 30, 1937__                                            --          10, 038, 788. 61

   Fiscal year ending June 30                 1933                1934              1935             1936              1937


Cost of new work .        .     -------          -         - -------------- --------------     --------------    -
Cost of maintenance                -..
                              - - .---     306, 898. 41         $294, 915. 39 $317, 950. 19     $236, 196. 10        $366, 122. 60

Total expended        .           ..-      309, 253. 43         271, 511. 67     53, 229. 09     227, 795. 90         366, 733. 95
Allotted .---..--------           ..------- 319, 841. 78        393, 900. 00     35, 099. 00     367, 897. 03          27, 000. 00


Balance unexpended July 1, 1936___                                                                              $405, 597. 18
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936--                                                                                            27, 000.00

      Amount to be accounted for_                                                                                432, 597. 18
Gross amount expended________________________ $372, 035. 27
Less reimbursements collected----------------    5, 301. 32
                                                                                                                 366, 733.95

      Balance unexpended June 30, 1937_                                                                           65, 863. 23
Outstanding liabilities June 30, 1937-----------                                      $56, 779. 27
Amount covered by uncompleted contracts-                                        _       1, 361. 43
                                                                                                                  58, 140. 70
      Balance available June 30, 1937_                                                                               7, 722. 53
Accounts receivable June 30, 1937_                                                                                      281. 41

     Unobligated balance available June 30, 1937_______                                                              8, 003. 94
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-__________--- -__          _______                                                      285, 500. 00
        Balance available for fiscal year 1938                                                                   293, 503. 94
Amount (estimated) required to be appropriated for completion
of existing project 3_______________________________________                                                1, 161, 300. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939 for maintenance 3_________                                                                       371, 500. 00
  1 Includes $591,161.39   expended on Wisconsin River.
  32 Includes $3,795,495.53 from permanent indefinite appropriation.
     Exclusive of available funds.

                  7. HARBORS AT WASHINGTON ISLAND, WIS.

  Location.-In the entrance to Green Bay, a westerly arm of Lake
Michigan, distant about 4 miles northeasterly from the north end of
the peninsula which separates Green Bay from Lake Michigan and
about 30 miles southeasterly from Escanaba, Mich. (See U. S. Lake
Survey Chart No. 715.)
         RIVERS AND HARBORS-MILWAUKEE,                 WIS., DISTRICT      1195

   Existing project.-This provides for an entrance channel at Detroit
Harbor, located on the south side of Washington Island, 150 feet
wide and 14 feet deep at low-water datum from that depth in Green
Bay to a turning basin of the same depth, 400 feet long and 150 to
300 feet wide, near the inner end of Detroit Island, a distance of
about 3,700 feet; and for an entrance channel at Jackson Harbor,
located on the north side of Washington Island, 150 feet wide and 12
feet deep at low-water datum through the entrance bar, a distance of
about 500 feet.
   The project depths are referred to low-water datum for Lake Mich-
igan, which is taken at 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half foot
above or below the annual mean stage, and extreme fluctuations of a
temporary nature, due to wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, made in 1937, is $67,500 ($60,000
for Detroit Harbor and $7,500 for Jackson Harbor). The latest
 (1937) approved estimate for annual cost of maintenance is $2,300
 ($1,500 for Detroit Harbor and $800 for Jackson Harbor).
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 90, 75th Cong., 1st sess.). The
latest published map is in the project document.
   Terminal facilities.-At Detroit Harbor there is a ferry dock, sev-
eral fishing wharves, and a marine railway. At Jackson Harbor there
are several fishing wharves and a landing for small craft. These
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project. The controlling depths at low-water datum at the
close of the fiscal year were 9 feet in a narrow entrance channel and
4.4 feet in the proposed turning basin at Detroit Harbor and about 9
feet in a narrow channel at the entrance to Jackson Harbor. There
have been no costs or expenditures on the existing project.
   Proposed operations.-The entrance channel and turning basin at
Detroit Harbor and the entrance channel at Jackson Harbor should be
provided as soon as funds are made available. The sum of $67,500
can be profitably expended during the fiscal year ending June 30,
1939, to be applied to dredging an entrance channel and turning basin
14 feet deep at Detroit Harbor and an entrance channel 12 feet deep
at Jackson Harbor; by contract, summer and fall of 1938.
                          Cost and financial summary
Total amount appropriated to June 30, 1937 ....    -
Amount (estimated) required to be appropriated for completion of exist-
ing   project               _.____..   _    ...   _                      $67, 500
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work               ____       __-______--                   67, 500
       8. STURGEON BAY AND LAKE MICHIGAN SHIP CANAL, WIS.

  Location.-This improvement is on the west shore of Lake Michi-
gan, distant about 52 miles northeasterly from Green Bay and about
128 miles northerly from Milwaukee. (See U. S. Lake Survey Chrt
No. 728.)
1196    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Previous projects.-Adopted by River and Harbor Acts of March 3,
1873, and June 14, 1880. The United States assumed possession of the
canal April 25, 1893, as provided by the River and Harbor Act of
July 13, 1892. The original project for the canal was adopted by the
River and Harbor Act of August 18, 1894, modified by River and
Harbor Act of June 3, 1896. The cost and expenditures prior to
commencement of the existihg project in 1903 are as follows: New
work, including purchase price of canal, $323,419.40; maintenance,
$30,410.21; a total of $353,829.61. For further details see page 1935
of Annual Report for 1915.
    Existing project.-This provides for an outer harbor or stilling
basin protected by two converging breakwaters, each 1,344 feet in
length, extending from the shore on either side of the easterly or
Lake Michigan end of the canal; for a revetted canal 7,200 feet in
length, varying in width from 160 to 250 feet; for a channel 23 feet
deep in rock cut, extending from that depth in Lake Michigan to
about 800 feet west of the east entrance of the revetted canal, a length
of about 0.6 mile; thence a channel 22 feet deep through an additional
6,400 feet of revetted canal and through Sturgeon Bay to the vicinity
of Sherwood Point, a length of about 8 miles, the total length of
                                                              G
channel being about 8.6 miles; the width of channel being 0 feet in
Lake Michigan, reducing to 200 feet through the harbor and 130 to
220 feet through the revetted canal, thence 250 feet through Stur-
geon Bay to a point 5,400 feet northwest of the railroad bridge in the
city of Sturgeon Bay and thence 500 feet to the vicinity of Sherwood
Point, and that the turning basin immediately west of the revetted
canal be eliminated from the project. The breakwaters are formed
of stone-filled piling and timber cribs and have been provided with
concrete superstructure; the revetments are formed of piling and
timber, 914 feet having been repaired with concrete superstructure.
     The project depth is referred to"low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctu-
ations of water level are seasonal changes of about one-half foot
above or below the annual mean stage, and extreme fluctuations of a
temporary nature, due to wind and barometric pressure, of about
11/2 feet above or below the mean lake level prevailing at the time.
     The estimate of cost for new work, revised in 1935, is $1,620,000,
exclusive of amounts expended on previous projects. The latest
  (1935) approved estimate for annual cost of maintenance is $25,000.
     The existing project was authorized by the following river and
harbor acts: The act of March 3, 1873, provided for the breakwaters
   (Annual Report for 1874, pt. 1, p. 142) ; act of July 13, 1892, provided
  for acquisition of the canal; act of June 13, 1902, provided for the
  canal revetments and consolidated the canal and harbor works (H.
  Doc. No. 117, 56th Cong., 2d sess.); act of August 30, 1935, provided
  for the present project dimensions of the channels and elimination of
  the turning basin immediately west of the revetted canal (Rivers and
  Harbors Committee Doc. No. 9, 74th Cong., 1st sess.). For latest
  published map see the last-mentioned document.
      Terminal facilities.--As the canal and connecting channel is a
  through waterway, the only terminal facilities are in the city of
   Sturgeon Bay, 4 miles from the west end of the revetted portion of
  the canal. These facilities consist of four coal wharves, two ship-
  building yards, and one package-freight wharf. The city of Stur-
        RIVERS AND HARBORS-MILWAUKEE,                 WIS., DISTRICT        1197
geon Bay has provided a public wharf. There is also a large stone
wharf located about 5 miles northwesterly from the city of Sturgeon
Bay.
   Operations and results during fiscal year.-Operations consisted
of dredging 14,280 cubic yards for restoration of 19-foot depth at a
cost of $6,300.31. Soundings were taken at a cost of $574.43. Repairs
to revetments, including the reinforcing and rebuilding of substruc-
ture where necessary, cost $53,176.25. All work was done by hired
labor and use of Government plant. The total cost was $60,050.99
for maintenance. The total net expenditures were $55,179.38.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 30, 1935, was completed in 1919 at a saving
of $7,777 under the estimated cost. The harbor entrance piers were
completed in 1880, the canal revetments in 1903, and the dredging
under the old project in 1919. No work has been done on the last
modification of the project providing for deepening and widening the
channel to 23- and 22-foot depths. Pile revetments require repairs
and backfilling. The superstructure on about 260 feet of south plank
crib revetment is in poor condition. The entrance piers are in good
condition.
   The controlling depths at low-water datum at the close of ihe
fiscal year were 18.6 feet over a midchannel width of 90 feet through
the outer harbor and 18.3 feet throughout the revetted canal. The
entire channel through the outer harbor and revetted canal has been
swept and all lose stone removed to old project depth and more where
there is greater depth to ledge rock. There is a controlling depth
of 19.3 feet over a middle width of 60 feet in the channel west of
the revetted canal. The costs under the existing project are $243,-
223.05 for new work and $601,084.31 for maintenance, a total of
$844,307.36. The total expenditures are $848,192.15. In addition
the sum of $425,259.17 was expended between April 25, 1893, and
June 30, 1917, on the operating and care of the works of improve-
ment under the provision of the permanent indefinite appropriation
for such purposes.
   Proposed operations.-Thebalance unexpended, together with allot-
ments of $611,500 made during July 1937, will be applied as follows:
Accounts payable June 30, 1937---------------------------------       $3, 291. 34
New work :
    Deepening (rock removal) easterly canal entrance and harbor,
      by contract during summer and fall of 1938 and spring of 1939_ 550, 000. 00
Maintenance:
    Operation of U. S. hopper dredge Meade, about Octo-
      ber 1937----------------------------------- ----    $8, 000. 00
    Operation of U. S. dipper dredge Kewaunee, about
      September-November 1937 ------------------          22, 353. 36
    Miscellaneous repairs to revetments and backfilling
      with United States plant, about September-Decem-
      ber 1937-------------------------------------- 31, 500. 00
                                                                      61, 853. 36

      Grand total---------------------------------------------        615, 144. 70
1198                   REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Dredging is required annually for maintenance of project dimen-
sions of present channel. The canal revetments are failing and require
extensive repairs. The additional sum of $57,000 can be profitably
expended during the fiscal year ending June 30, 1939, as follows:
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, during fall of 1938____ $17, 000
    Miscellaneous repairs to revetments and backfilling with United
      States plant during the fall of 1938    --------------------      40, 000
              Total----------------------------_____                                                                    57, 000

                                            Cost and financial summary
Cost of new work to June 30, 1937         -                       $566, 642. 45
Cost of maintenance to June 30, 1937__________________________ 11, 056, 753. 69
      Total cost of permanent work to June 30, 1937                                                           1, 623, 396. 14
Undistributed costs June 30, 1937--                                                                                7, 176. 13
               Net total cost to June 30, 1937____________________________                                    1, 630, 572. 27
Minus accounts payable June 30, 1937__________________________                                                        3, 291. 34
     Net total expenditures____________________________                                                     1,   627, 280. 93
Unexpended balance June 30, 1937----                   -                                                           3, 644. 70

               Total amount appropriated to June 30, 197_____________ 11, 630, 925. 63

              Fiscal year ending June 30                 1933             1934            1935           1936            1937


Cost of new work ........
Cost of maintenance. ..                    -----   _   $3,108.43      $39, 419.30      $52,395.87     $60, 815.56      $60, 050. 99
Tctal expended ------------------. -------              3, 377. 02     39, 675. 19      52, 293. 98    68, 810. 15      55, 179. 38
                                                                                    .
                                                                     - _______________________
Allotted.....--.........................                1, 300.00      72, 500. 00      56, 000. 00    72, 500.00        9, 000.00
                                                                                                                                --
Balance unexpended July 1, 1936_____________ __ _________                                                        $49, 824. 08
Amount allotted from War Department Approprialtion Act ap-
proved May 15, 1936----------------___                                                                              14, 000. 00

     Amount to be accounted for_____________                                                                         63, 824. 08
Deductions on account of revocation of allotment___________                                                           5, 000. 00
               Net amount to be accounted for _-                           --                                        58, 824. 08
Gross amount expended___     ________________                                            $55, 397. 94
Less reimbursements collected______________                                                   218. 561
                                                                                                                     55, 179. 38
               Balance unexpended June 30                   1937 ______________________                               3, 644. 70
Outstanding liabilities June 30, 1937                                -- ___          ____________                     3, 379. 85
               Balance available June 30, 1937_________________________                                                 264. 85
Amount allotted from War Department Civil Appropriation Act
     approved July 19, 1937_________________                                                                     611, 500. 00

               Balance available for fiscal year 1938 _______                                                    611, 764. 85
Amount (estimated) required to be appropriated for completion
     of existing project 2_______________________________________                                            1, 375, 000. 00
Amount that can be profitably expended in fiscal year ending
     June 30, 1939, for maintenance 2 ________________-_____                                                         57, 000. 00
     1 Includes $425,259.17 from the permanent indefinite appropriation.
     2 Exclusive of available funds.
       RIVERS AND HARBORS-MILWAUKEE,            WIS., DISTRICT     1199

                          9. ALGOMA HARBOR, WIS.

   Location.-Algoma Harbor is on the west shore of Lake Michigan,
distant about 68 miles from Green Bay via Sturgeon Bay Canal and
about 115 miles northerly from Milwaukee. (See U. S. Lake Survey
Chart No. 72.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871, and modified by river and harbor acts of March 3,
 .873; March 3, 1875; July 5, 1884; and March 3, 1899. The cost and
expenditures prior to the commencement of the existing project in
1907 were $192,773.50 for new work, $8,687.96 for maintenance, a
total of $201,461.46. (For further details see p. 1935 of Annual Re-
port of 1915.)
   Existing project.-This provides for an outer harbor 14 feet deep
enclosed by two piers or breakwaters, one on the north side of the
river, 1,102 feet long, extending approximately normal to the shore
into the lake, and the other, 1,530 feet long, extending from the shore
at a point about 1,000 feet south of the original river mouth, and
for a channel of same depth as outer harbor, except where rock is
encountered at less depth, extending from that depth in the lake up
the river a distance of 1,000 feet from its mouth, a total length of
about 2,100 feet; this channel varies in width from 175 to 80 feet at
Second Street Bridge. The breakwaters are formed of stone-filled
timber cribs, concrete caissons, and piling, all of which are capped
with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of about one-half foot above
or below the annual mean stage and extreme fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, made in 1907, was $140,000,
exclusive of amounts expended on previous projects. The latest
 (1917) approved estimate for annual cost of maintenance is $3,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1871, provided for the north pier
or breakwater (Annual Report for 1871, p. 126); the act of March
2, 1907, provided for the south breakwater and the present channel
dimensions without prior survey or estimate (unpublished report sub-
mitted September 25, 1907). (For latest published map see Annual
Report for 1908, p. 1954.)
   Terminal facilities.-These consist of a coal wharf and several fish-
ing wharves. The facilities are considered adequate for existing
commerce.
    Operations and results during fiscal year.-Operationsconsisted of
dredging 17,856 cubic yards, by hired labor and use of Government
plant, for restoration of project depth at a total cost of $5,256.94 for
maintenance. The total net expenditures were $5,251.84.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1909 at a saving of $40,764 under the estimated cost. The
north pier was completed in 1890, the south pier and breakwater and
dredging in 1909. The piers and breakwater are in good condition.
The controlling depths at low water datum at the close of the fiscal
year were 15.3 feet in the entrance channel to outer enid of south stub
      20196-37-pt. 1-76
1200             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

pier, decreasing to 11.8 feet to the coal wharf at the inner end of the
north pier, thence 8.5 feet in a narrow channel to Second Street
Bridge. The Ahnapee River is navigable for a distance of about 2
miles from its mouth for vessels drawing not more than 4 feet. The
costs under the existing project are $99,236.15 for new work and
$225,553.71 for maintenance, a total of $324,789.86. The total expen-
ditures are $324,906.84.
   Proposed operations.-The balance unexpended, together with an
allotment of $7,000, and a revocation of $200, made during July, will
be applied as follows:
Accounts payable June 30, 1937-----------------------------------   $16. 87
Maintenance: Operation of U. S. dipper dredge Kewaunee, about
August 1937---------------------------------------------------   7,042.04

          Total------------ ----------------------------------------                                                      7, 058. 91
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $6,500 can be profitably ex-
pended during the fiscal year ending June 30, 1939, in maintenance
operation of U. S. dipper dredge Kewaunee during summer of 1938.
                                              Cost and financial sunvmary
Cost of new work to June 30, 1937----------------------                                                            $292, 009. 65
Cost of maintenance to June 30, 1937 --------------------------                                                     234, 241. 67
      Total cost of permanent work to June 30, 1937 _____________-526, 251. 32
Undistributed costs June 30, 1937                                      133. 85
      Net total cost to June 30, 1937 ------                                           --------------                 526, 385. 17
Minus accounts payable June 30, 1937___16.                                                                                      87
           Net total expenditures                                    ----------------------                             526, 368. 30
Unexpended balance June 30, 1937 _____-__-______-__-__--_                                                                   258. 91
           Total amount appropriated to June 30, 1937-----------------                                                526, 627. 21

           Fiscal year ending June 30                            1933        1934             1935          1936             1937


Cost of new work--------------------------------------------
Cost of maintenance .......------------------ $74, 154. 01 -----------                    $17, 247. 71   $24, 548. 61       $5, 256. 94
               ---
Total expended __            ........     -.--..... -          89, 578.81    $222.18       14, 503. 18    27,151.02          5, 251. 84

Allotted.----------------------------37,800.00                              1,850.00        25,000.00     16.700.00


Balance unexpended July 1, 1936 .....-_____________                                             ____-      -____ $5, 510. 75
Gross amount expended    ___________-_______                                                     -____            5, 251. 84
      Balance unexpended June 30, 1937---------------------------                                                           258.91
Outstanding liabilities June 30, 1937 ________-___________________                                                           16. 87
     Balance available June 30, 1937 __-------------------------------1242.                                                         04
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------------------------------------_                                                          7, 000. 00
           Balance available for fiscal year 1938_______________________                                                  7, 242. 00
Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance 2___________________6________________                                                             6, 500. 00
    ' Includes $200 revoked in July 1937.
   2  Exclusive of available funds.
       RIVERS AND HARBORS--MILWAUKEE,          WIS., DISTRICT    1201
                     10. KEWAUNEE HARBOR, WIS.

   Location.-On the west shore of Lake Michigan, distant about 105
miles northerly from Milwaukee and about 78 miles from Green Bay,
via Sturgeon Bay Canal. The harbor is at the mouth of the Kewau-
nee River. (See U. S. Lake Survey Chart No. 73.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1881. The cost and expenditures prior
to the commencement of the existing project in 1916 were $149,312.44
for new work, $88,363.97 for maintenance, a total of $237,676.41. For"
further details see page 1936 of Annual Report for 1915.
   Existing project.-This provides for a converging north break-
water and shore connection about 3,130 feet long, removal of about
1.,400 feet of the total length of about 1,850 feet of the north pier, a
south pier about 1,850 feet long, an entrance channel of a general
width of 525 feet, about 2,800 feet long and 20 feet deep, leading to
an interior turning basin of the same depth; also for removal of the
outer south shoal to a depth of 22 feet. The parallel piers are formed
of stone-filled piling and are capped with concrete superstructure.
   The north breakwater is formed of concrete caissons and the north
shore connection is a rubble mound.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctu-
ations of water level are seasonal changes of about one-half foot above
or below the annual mean stage, and extreme fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 11/2 feet
above or below the mean lake level prevailing at the time.
    The estimate of cost for new work, revised in 1935, is $690,000, ex-
clusive of amount expended on previous projects. The latest (1935)
approved estimate of annual cost of maintenance is $10,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the entrance piers
 (Annual Report for 1881, p. 2082); act of June 25, 1910, provided
for the turning basin (H. Doc. No. 324, 60th Cong., 1st sess.) ; under
date of May 28, 1935, the Emergency Relief Appropriation Act
authorized, and the act of August 30, 1935, provided for the north
breakwater, removal of old north pier, widening and deepening the
entrance channel and turning basin to 20 feet, and removal of the
outer south shoal (Rivers and Harbors Committee Document No. 43,
72d Cong., 1st sess.). The latest published map is in the last-
mentioned document.
  Local cooperation.-Fullycomplied with.
   Terminal facilities.-Besides two car-ferry slips, there is a coal,
wood, and grain wharf.     These facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year-Regular funds.-Op-
erations consisted of dredging 3,000 cubic yards, by hired labor and
use of Government plant, for restoration of 18-foot depth at a
total cost of $1,201.24 for maintenance. The total net expenditures
were $1,581.58.
  Emergency Relief funds.-Operations consisted of completing, by
contract, the construction of the north breakwater and shore con-
nection and removal of the outer 706.5 linear feet of the north pier,
which were in progress at the close of the previous fiscal year, at
1202      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

a total cost of $294,836.23 for new work. The total net expenditures
were $298,025.04.
    The total costs, all funds, were $296,037.47, of which $294,836.23
was for new work and $1,201.24 for maintenance. The total net
expenditures were $299,606.62.
    Condition at end of fiscal year.-The existing project is about 63
percent completed. The piers were completed in 1897 and are in
generally good condition. The north breakwater and shore con-
nection, except for a gap of 150 feet about 830 feet from the shore-
ward end, and the removal of the outer 706.5 linear feet of the north
pier were completed in 1937. Dredging the entrance channel and
interior basin to a depth of 20 feet, as authorized by the last modifi-
cation of the project, has not been commenced. Removal of the
outer shoal and the additional 700 linear feet of the north pier,
and closing the gap in the north-shore connection are not consid-
ered necessary under present conditions. The controlling depth at
low-water datum at the close of the fiscal year was 18.5 feet in
the entrance channel between the piers, and 18.1 feet over an area
250 by 400 feet in the inner basin. The Kewaunee River is navi-
gable for a distance of about 61/2 miles above the mouth for craft
drawing not more than 4 feet. The costs under the existing project
from regular funds are $24,898.03 for new work and $174,667.02 for
maintenance, a total of $199,565.05.      The total expenditures are
$201,205.35. The costs under the existing project from Emergency
Relief funds are $418,537.22 for new work. The total expenditures
are $383,234.45. The total costs, all funds, are $618,102.27, of which
$443,435.25 was for new work and $174,667.02 for maintenance. The
total expenditures are $584,439.80.
   Proposed operations.-The balance of regular funds unexpended,
including accounts receivable, together with allotments of $69,700
made during July 1937, less a revocation of $1,200 during July, will
be applied as follows:
Accounts payable June 30, 1937--                                          43
                                                                    $------------------
New work: Deepening entrance channel and inner basin to 20-foot
  depth by contract during summer and fall of 1938__---------___ 60, 200. 00
Maintenance: Operation of U. S. dipper dredge Kewaunee, about
April 1938  ---------------------------------------------------- 9, 500. 00
       Total ---                                                    69-----------------------------
                                                                        851. 43
   The balance of unexpended funds from the Emergency Relief Act,
including accounts receivable, will be applied to the payment of
accounts payable.
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $9,000 can be profitably
expended during the fiscal year ending June 30, 1939, in maintenance
operation of U. S. dipper dredge Kewaunee, during the spring of 1939.
           RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                     1203
                                      Cost and financial summary
                            MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937-----------------------------                                     $174, 210.47
Cost of maintenance to June 30, 1937___________------------------                                   263, 030. 99

      Total cost of permanent work to June 30, 1937-----------                                      437, 241. 46
Undistributed costs June 30, 1937___             _                                                    1, 708. 54

      Net total cost to June 30, 1937_______---------------------                                   438, 950. 00
Plus accounts receivable June 30, 1937__________ --------------                                           83. 19

      Gross total costs to June 30, 1937_ -------------------                                       439, 033.19
Minus accounts payable June 30, 1937-----------------------------                                        151. 43

     Net total expenditures____________________________                                            438, 881. 76
Unexpended balance June 30, 1937______________                                                          268.24
                                                                                                      1_________,

        Total amount appropriated to June 30, 1937 -----------------                               440, 150. 00

        I'iscal year ending June 30              1933          1934            1935         1936            1937


                  - --- -
Cost of new work- --        - - -- - - - - - - - -          - - - - - -- - - - - - - ----- -     -
Cost of maintenance...-------------------$9, 421.89          $8, 359. 61 $6, 799. 58 $7, 061. 75           $1, 201. 24
Total expended ----------    -------------    10, 744. 94     9, 000. 00   6,669. 42       6,828. 83        1, 581. 58
Allotted----------     -------------------    12, 750. 00     9, 600. 00   7,000.00          000.00
                                                                                           10,            -8, 506. 00


Balance unexpended July 1, 1936_______-    _________--__------    $11, 349. 82
Deductions on account of revocation of allotment ----------------   8, 500. 00

        Net amount to be accounted for ___--                                                            2, 849.82
Gross    amount expended _________--_______________                                    _                1, 581. 58

      Balance unexpended June 30, 1937__-------    ____----1,                                              268. 24
Outstanding liabilities June 30, 1937____________________--                                                151. 43

        Balance      available        June 30,   1937-----------------1,116.                                    81
                                 -------------------------------
Accounts receivable June 30, 1937___                                                                        83. 19

     Amount revoked in July 1937___--____------__---------------                                        1, 200. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937                                                                                    700. 00
                                                                                                       6------------------------------

        Balance available for fiscal year 1938________________                              ___        69, 700. 00

Amount (estimated) required to be appropriated for completion of
existing project -------------------------------------------- 186, 300. 00
Amount that can be profitably expended               in fiscal year ending
                                  - - - - - -- - - - - -
J'une 30, 1939, for maintenance 1________                       __________ 9, 000. 00
  1 Exclusive of available funds.

                                       EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937----------___________ $418, 537.22
Cost of maintenance to June 30, 1937--   ____________________ __--______
      Total cost of permanent work to June 30, 1937-....--                                          418, 537. 22
Undistributed costs June 30, 1937________--__________________-                                        1, 398. 83

      Net total cost to June 30, 1937_---------      ________-___                                   419, 936. 05
Plus accounts receivable June 30, 1937 --------------                                                 3, 460. 02
        Gross total costs to June 30, 1937----------------- --------                                423, 396. 07
1204           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Minus accounts payable June 30, 1937-                                    -                                                 $40, 161. 62

     Net total expenditures -------------------------------                                                               383,234. 45
Unexpended balance June 30, 1937---------------------------36,                                                                765. 55
          Total amount appropriated to June 30, 1937-------------420, 000. 00

   Fiscal year ending June 30                     1933            1934                   1935                1936               1937


                ...--------------
Cost of new work___-__-                      -       -                                                -   $123, 700. 99       $294, 836. 23
Cost of maintenance-......------------.
Total expended----            ---.       -------------- -------------            -------------              85, 209. 41        298, 025.04

Allotted-----------------------..................---------------------                   $420,000-----------------------


Balance unexpended July 1, 1936---------------_---------                                                                  $334, 790. 59
Gross amount expended ----------------------------                                               $298,275.49
Less reimbursements collected-----------------------                                                  250. 45
                                                                                                                           298, 025. 04

     Balance unexpended June 30, 1937----------------------36, 765. 55
Amount covered by uncompleted contracts--------------------40, 225. 57

     Balance available June 30, 1937    --------------------   -- 3,460. 02
Accounts receivable June 30, 1937-----------------------------    3,460. 02
   'CONSOLIDATED           COST AND FINANCIAL SUMMARY                             FOR KEWAUNEE HARBOR,                         WIS.

Cost of new work to June 30, 1937 ------------------------   $592,747.69
Cost of maintenance to June 30, 1937------------------------ 263, 030. 99

      Total cost of permanent work to June 30, 1937----------__                                                            855, 778. 68
Undistributed costs June 30, 1937 -----------------------------                                                              3, 107.37
      Net total cost to June 30, 1937_                                                                                     858, 886. 05
Plus accounts receivable June 30, 1937-----------------------                                                                3, 543.21
     Gross total costs to June 30, 1937----------------------862,429. 26
Minus accounts payable June 30, 1937----------------____        40,313.05
     Net total expenditures-. .------------------------     822,116. 21
Unexpended balance June 30, 1937---------------------------38, 033. 79
          Total amount appropriated to June 30, 1937                                                                             150. 00
                                                                                                                           8-------------60,

    Fiscal year ending June 30                    1933            1934                   1935                1936               1937

                                                    ......-------------.
Cost of new work .....................--------------...-----------                                        $123, 700. 99       $294, 836. 23
Cost of maintenance ............-------          $9, 421.89      $8, 359. 61           $6, 799. 58           7,061. 75           1, 201. 24
       Total cost-_----------------               9, 421. 89      8, 359. 61             6, 799. 58        130, 762. 74        296, 037. 47
Total expended....----------------               10, 744. 94      9, 000. 00             6. 669. 42         92, 038. 24        299, 606. 62

Allotted_--------..          ---......           12, 750.00       9, 600.00          427, 000.00            10,000.00          -8, 500.00


Balance unexpended July 1, 1936_----------------                $346, 140.41
Deductions on account of revocation of allotment---------------- 8, 500. 00

          Net amount to be accounted for-------------------------_                                                         337, 640. 41
Gross amount expended-------------------------$299, 857. 07
Less reimbursements collected ----------------------- 250. 45
                                                                                                                          299,606.62
          Balance unexpended June 30, 1937                                   _            -------                           38, 033.79
         RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                          1205,
Outstanding liabilities June 30, 1937-------------------- $151. 43
Amount covered by uncompleted contracts ___________ 40, 225. 57
                                                                         $40, 377. 00,

      Balance available June 30, 1937_______________----------           -2, 343. 21
Accounts receivable June 30, 1937_______________-------
                                        -------                            3, 543.21

      Amount revoked in July 1937                   ------------------     1, 200. 00
                                                                           1-----__--

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------------          69, 700. 00
     Balance available for fiscal year 1938___----------------           69, 700. 00

Amount (estimated) required to be appropriated for completion of
  existing project    _ _________                                        186, 300. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1_______________________--_                    9, 000. 00
  1Exclusive of available funds.

                        11. TWO RIVERS HARBOR, WIS.

   Location.-This harbor is on the west shore of Lake Michigan, dis-
tant about 82 miles northerly from Milwaukee and about 101 miles
from Green Bay via Sturgeon Bay Canal. (See U. S. Lake Survey
Chart No. 73.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871. The cost and expenditures prior to the commence-
ment of work under the existing project in 1907 were $212,857.20 for
new work, $33,113.35 for maintenance, a total of $245,970.55. For
further details see page 1936 of Annual Report for 1915.
   Existing project.-Thi provides for two entrance piers at the mouth
of Twin Rivers, 245 feet apart at the outer ends and 750 feet apart at
the shore line, having lengths of about 1,642 feet and 1,720 feet for
the north and south piers, respectively; for a channel 2,600 feet long
and 18 feet deep extending from that depth in the lake to an inner
basin of the same depth at the confluence of the East and West Twin
Rivers, the channel varying in width from 500 feet at the outer end
to 200 feet between the piers; for a revetment about 450 feet long on
the north side at the inner end of the channel and for a small stilling
basin beyond the shore line on the north side of the channel. The
piers are formed of stone-filled timber cribs and piling; 1,241 feet of
the north pier and 198 feet of the south pier has been provided with
concrete superstructure; about 300 feet of the south pier has been
provided with rubble superstructure; 904 feet of the crib piers has
been paved with concrete; the revetment on north side of channel is
provided with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of about one-half foot above
or below the annual mean stage and extreme fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 11/2 feet
above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1935, is $85,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate of annual cost of maintenance is $7,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1871, provided for the south pier,
750 feet of the north pier, and about 44 feet of the north revetment
1206     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

(Annual Report for 1871, p. 123, as modified by the Chief of Engi-
neers, Feb. 27, 1897); act of March 2, 1907, provided for the re-
mainder of the north pier and the stilling basin (modification of
plan A, H. Doc. No. 730, 59th Cong., 1st sess.) ; and the act of August
30, 1935, provided for deepening the entrance channel and inner
basin to 18 feet (Rivers and Harbors Committee Doc. No. 25, 73d
Cong., 2d sess.). The latest published map is in the last-mentioned
document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-These consist of a coal wharf and several
fishing wharves. The city has provided a wharf for public use.
These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted
of dredging 86,947 cubic yards to obtain the new project depth of
18 feet over a width of 180 feet in the channel between the piers
and in the inner basin at a cost of $21,162.26. Soundings were
taken at a cost of $619.71 and emergency repairs to the south pier
cost $85.48. Repairing substructure and constructing concrete super-
structure on 720 linear feet of the south revetment, in progress at
the close of the fiscal year, cost $3,866.58. All work was done by
hired labor and use of Government plant. The total cost was
$25,734.03, of which $21,162.26 was for new work and $4,571.77 for
maintenance. The total net expenditures were $23,143.42.
   Condition at end of fiscal year.-The existing project is about 88
percent completed. The south pier, completed in 1883 and the north
pier in 1908, are in fair condition. The dredging was substantially
completed in 1937. The work remaining to be done to complete the
project is dredging a 10-foot width along each side of the lakeward
portion of the entrance channel between the piers. This dredging
was necessarily omitted to avoid removal of riprap along the en-
trance piers and thereby endangering them. The present width of
channel is considered adequate for present and reasonably pros-
pective commerce. The controlling depth at low-water datum at
the close of the fiscal year was 18 feet in the entrance channel
between the piers and in the inner basin. East and West Twin
Rivers are navigable for about 3 and 7 miles, respectively, from the
harbor piers for craft drawing not more than 4 feet. The costs
under the existing project are $74,721.66 for new work and $294,-
605.21 for maintenance, a total of $369,326.87. The total expenditures
are $367,155.92.
   Proposed operations.-The balance unexpended, together with an
allotment of $40,000, made during July, will be applied'as follows:
Accounts payable June 30, 1937_ __                     ____________-------------__   $4, 465. 40
Maintenance :
    Operation of U. S. hopper dredge Meade, about April 1938_ _____ 12, 500. 00
    Complete reinforcing substructure and rebuilding superstruc-
      ture on 720 linear feet of south revetment with United States
      plant, July-November 1937------------------------------- 38, 149. 40
    Riprap and refill piers with United States plant, 1,500 tons at
      $3, during July-November 1937_----------------------------     4,500.00
        Total--------------------------------------_                                 59, 614. 80
              RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                                    1207
   Dredging is required annually for maintenance of project dimen-
sions of channel. The piers require riprap and fill. The additional
sum of $11,000 can be profitably expended during the fiscal year
ending June 30, 1939, as follows:
Maintenance :
   Operation of U. S. dipper dredge Kewaunee, during spring
      of 1939--------------- -----        ----             ------                                                            $9, 500:
   Riprap and fill piers, 500 tons, at $3, with United States plant
      during the summer of 1938--------------------------------                                                               1, 500
              Total ---------------------------------------------------                                                      11, 000
                                            Cost and financial summary
Cost of new work to June 30, 1937-----------------------------$287, 578. 86
Cost of maintenance to June 30, 1937----------------------------327, 718. 56
      Total cost of permanent work to June 30, 1937- ---------                                                       615, 297. 42
Undistributed costs June 30, 1937------------------------                                                              2, 294. 45
     Net total cost to June 30, 1937_---------------------------                                                     617, 591. 87
Minus accounts payable June 30, 1937-------------------_      ___                                                      4, 465. 40'
     Net total expenditures-----------------------------------613, 126. 47
Unexpended balance June 30, 1937-------------------------        19, 614. 80
           Total amount appropriated to June 30, 1937----------------                                                632, 741. 27

           Fiscal year ending June 30                    1933            1934              1935              1936             1937


Cost of new work..---       ------------------          ----------- ------------ ------------          ------------        $21, 162. 26
Cost of maintenance             ..----------------.. ..   $7, 717. 33 $13, 692. 41 $17, 122. 71            $8, 941. 05       4, 571. 77
      Total cost.------------------------               7, 717. 33    13, 692. 41        17, 122. 71        8, 941.05       25, 734. 03
Total expended        .-----------------------         7, 679. 15     13, 758. 36        17, 407. 13        9, 076. 29      23, 143. 42
Allotted      ----------------------------...          5,800.00       24, 967. 49        16, 500.00 -20,000. 00             31, 000.00


Balance unexpended July 1, 1936---------------------------     $11, 758.22
Amount allotted from War Department Appropriation Act approved
May 15, 1936-----------            --------------------        31, 000. 00
           Amount to be accounted for.-_                                                                                 42, 758. 22
Gross amount expended                                            --------------                                          23, 143. 42

      Balance unexpended June 30, 1937--------------------------19, 614. 80
Outstanding liabilities June 30, 1937                             4, 465. 40
     Balance available June 30, 1937----------------------------____                                                     15, 149. 40
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------------------------------------                                                          40,000.00
    Balance available for fiscal year 1938--------   __----------                                                        55, 149. 40
Amount (estimated) required to be appropriated for completion of
  existing project 1--                                                              --            -                      10, 300. 00
Amount that can be profitably expended in fiscal year ending June 30,
   1939, for maintenance 1--------------                                                               _       _         11, 000. 00
  1 Exclusive of available funds.
                                    12. MANITOWOC HARBOR, WIS.
  Location.-This harbor is on the west shore of Lake Michigan, dis-
tant about 79 miles northerly from Milwaukee and about 106 miles
1208     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

from Green Bay via Sturgeon Bay Canal. (See U. S. Lake Survey
Chart No. 734.)
   Previous projects.-The original project was adopted in 1854, the
first appropriation for the improvement having been made by the
River and Harbor Act of August 30, 1852. The project was modi-
fied by subsequent River and Harbor Acts of March 3, 1881, Septem-
ber 19, 1890, June 3, 1896, and June 13, 1902. The cost and expendi-
tures prior to the commencement of work under the existing project
in 1907 were $400,126.14 for new work and $54,287.93 for maintenance,
a total of $454,414.07. For further details see page 1937 of Annual
Report for 1915.
   Existing project.-This provides for an outer harbor or stilling
basin formed by two breakwaters extending from the shore on either
side of the mouth of the Manitowoc River 425 feet apart at their
outer ends and diverging to a distance of about 2,325 feet apart at
their inner ends, having lengths of 2,540 feet and 2,290 feet for the
north and south breakwaters, respectively; for a channel 21 feet deep,
extending from that depth in the lake through the outer harbor to
the mouth of the river, a total length of about 2,500 feet, with a width
of about 650 feet; for a channel 21 feet deep in Manitowoc River from
the river mouth to the second railway bridge, a distance of approxi-
mately 1.7 miles, with widths of 180 feet at the mouth, reducing to 150
feet at the upper end, with intermediate reductions and enlargements;
for removal of old north stub pier at the river entrance; and for
dredging in the outer harbor an approach channel 21 feet deep to a
proposed city terminal on the lake front south of the shore end of the
south breakwater. The breakwaters are formed of stone-filled timber
cribs, concrete caissons, and piling, all of which are capped with con-
crete superstructures.
    The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
.of a temporary nature, due to wind and barometric pressure, of about
11/2 feet above or below the mean lake level prevailing at the time.
    The estimate of cost for new work, revised in 1937, is $501,000, ex-
clusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $19,500.
    The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for the breakwaters
  (H. Doc. No. 62, 59th Cong., 1st sess., as modified by Rivers and
Harbors Committee Doc. No. 3, 59th Cong., 2d sess.); the act of
August 30, 1935, provided for the present dimensions of the channel
through the outer basin and removal of the old north pier (Rivers
and Harbors Committee Doc. No. 39, 73d Cong., 2d sess.); and the
act of August 26, 1937, provided for the channel in the river (Rivers
and Harbors Committee Doc. No. 80, 74th Cong., 2d sess.). For the
latest published map see the last-mentioned document.
    Local cooperation.-The act of August 30, 1935, provided that the
work of dredging an approach channel to the proposed city terminal
in the outer harbor "shall not be undertaken until local interests
shall have submitted assurances satisfactory to the Secretary of War
that such terminal will be constructed."' Latest information indicates
        RIVERS AND HARBORS-MILWAUKEE,                 WIS., DISTRICT       1209
that the plan for the municipal terminal has been abandoned at least
temporarily.
   The act of August 26, 1937, provided "that no dredging shall be
done. (in the river channel) until local interests have released the
Government, in a manner satisfactory to the Secretary of War, from
all liability for damages to lands, revetments, structures, and sub-
aqueous installations attributable to the dredging operations." No
delay in compliance is anticipated.
   Terminal facilities.-Besides 3 car-ferry slips there are several
wharves used for handling coal, building materials, cement, and mis-
cellaneous commodities. While these facilities are considered fairly
adequate for existing commerce, it is believed the city should provide
a suitable wharf with warehouse and railway connection, which should
be open to the general public.
   Operations and results during fiscal year.-Operations consisted
of commencing, by contract, the widening and deepening of the en-
trance channel to 21 feet and removal of the old north stub pier.
A total of 37,483 cubic yards was removed at a cost of $14,745.
Soundings were taken and borings were made, by hired labor and use
of Government plant, at a cost of $2,618.09. The total costs were
$17,363.09, of which $14,745 was for new work and $2,618.09 for
maintenance. The total net expenditures were $9,410.38.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 26, 1937, is about 66 percent completed. The
breakwaters completed in 1910 are in good condition. Dredging is in
progress to obtain the project dimensions of the channel through
the outer basin. No work has been done on the last modification of
the project providing for dredging the channel in the river, or on
dredging the approach channel in the outer harbor. The controlling
depth at low-water datum at the close of the fiscal year was 21.5 feet
over a minimum width of about 320 feet through the outer basin and
16 feet in the river to the second railway bridge. The costs under
the existing project are $248,993.48 for new work and $448,225.50 for
maintenance, a total of $697,218.98. The total expenditures are
$690,941.20.
   Proposed operations.-The balance unexpended, together with an
allotment of $3,000 for maintenance on July 20, 1937, will be applied
as follows:
Accounts payable June 30, 1937_- --- __--       -__________________ $6, 277. 78
New work: Complete widening and deepening entrance channel to 21
  feet depth and removing old north stub pier by contract, July 1938_ 68, 985. 07
Maintenance:
    Operation of U: S. dipper dredge Kewaunee, about May
       1938--------------------------------------------- $1, 500. 00
Repairs to pile clump in outer harbor, September 1937-__     1,500. 00
                                                                       3, 000. 00

      Total--------------------------      ----------------------      78, 262. 85
  The river should be dredged as soon as local cooperation has been
complied with and funds therefor become available. Dredging is
required annually for maintenance of project dimensions of channel.
1210          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

The breakwaters require riprap. The additional sum of $128,000 can
be profitably expended during the fiscal year ending June 30, 1939, as
follows:
New work: Dredging river channel to 21 feet depth, by contract,
summer and fall of 1938----------------------------------------        $115, 000
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, during spring
      of 1939___--------------------------------------------   $10, 000
   Riprap breakwaters, 1,000 tons, at $3, with United States
      plant, during the summer of 1938------ --------            3, 000
                                                                          13, 000

            Total----------------------------------------------------                                                                      128, 000

                                           Cost and financial summary

Cost of new work to June 30, 1937-------------------------------$649, 119. 62
Cost of maintenance to June 30, 1937---------------------- ------ 502, 513. 43

      Total cost of permanent work to June 30, 1937-------------1,                                                                   151, 633. 05
Minus accounts payable June 30, 1937----------------                                                                                    , 277. 78
                                                                                                                                       6------------

     Net total expenditures----------------------------------1, 145, 355. 27
Unexpended balance June 30, 1937------------------------------   75, 262. 85
         Total amount appropriated to June 30, 1937----------------1, 220, 618. 12

         Fiscal year ending June 30                   1933                        1934                      1935            1936              1937


Cost of new work ..........----------------------     --..........................------------..                                             $14, 745.00
                                                                                                                          ..------------.------------.
Cost of maintenance----------------------           $8, 718. 12           $12, 584. 57                    $7, 720. 46   $11, 473. 62            2, 618.09
      Total cost---------..    ---.------------      8, 718.12               12, 584. 57                   7, 720.46     11, 473. 62        17, 363. 09

Total expended--....---------------------            6, 257. 97              13, 398. 94                   9, 460. 61    12, 726. 79          9, 410. 38
Allotted ----------------------------- 5, 800. 00                            27, 800. 00                   3, 000. 00     8, 700. 00        75, 000. 00


Balance unexpended July 1, 1936--------------------------------                                                                        $9, 673. 23
Amount allotted from War Department Appropriation Act approved
May 15, 1936 ----------------------------------                                                                                       75, 000. 00
      Amount to be accounted for------------------------------                                                                         84, 673.23
Gross amount expended--------------------------------------                                                                             9, 410. 38
     Balance unexpended June 30, 1937__                                                                                                75, 262. 85
Amount covered by uncompleted contracts-----------------------                                                                         75, 262. 85
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------------                                                                         3, 000. 00
Balance available for fiscal year 1938                                                        ---------                                 3, 000. 00
Amount        (estimated)          required to be appropriated for completion
                                               _
   of existing project 1______                         ____                                                   ______----------------
                                                                                                                                 183, 000. 00

Amount that can be profitably expended                                           in fiscal year ending
June 30, 1939:
                               _
      For new work                                                                                        _-___---------------_      115, 000. 00
      For maintenance 1 _______________                                                                                               13, 000. 00

         Total 1 --                  ---------------------------------                                                               128,000.00
  1 Exclusive      of available funds.
        RIVERS AND HARBORS-MILWAUKEE,           WIS., DISTRICT     1211
                    13. SHEBOYGAN HARBOR, WIS.

    Location.-This is on the west shore of Lake Michigan, distant
about 26 miles south from Manitowoc and about 55 miles north of
Milwaukee. (See U. S. Lake Survey Chart No. 737.)
    Previous projects.-The original project was adopted by the
River and Harbor Act of June 23, 1866, and modified by River and
Harbor Acts of March 3, 1873, March 3, 1881, August 18, 1894,
March 3, 1899, and June 13, 1902. The total cost and expenditures
prior to commencement of the existing project in 1907 were $487,-
816.64 for new work and $87,131.46 for maintenance, a total of
 $574,948.10. For further details see page 1937 of Annual Report
for 1915.
    Existing project.-This provides for an outer harbor or stilling
basin formed by a breakwater extending from the shore about 2,100
feet north of the mouth of the Sheboygan River for a total length
.of 3,829 feet, and a south pier 2,750 feet long extending into the lake
about normal to the shore on the south side of the mouth of the
river, and for a turning basin 900 feet wide and 20 feet deep in the
outer harbor with an entrance channel about 3,500 feet long through
the south side of the basin, the depth being 25 feet from the lake-
ward end to a point 500 feet shoreward of the end of the north
breakwater, decreasing to 21 feet in the next 300 feet and continuing
at the latter depth to the inner end of the improved channel, the
widths to be 400 feet at the lakeward end and 500 feet through the
turning basin, decreasing to 200 feet at the river mouth. The north
breakwater is formed of stone-filled timber cribs, concrete caissons,
and piling, all of which is capped with concrete superstructure.
The south pier consists of timber cribs and piling, all of which has
also been provided with concrete superstructure.
    The project depth is referred to low-water datum for Lake Michi-
-gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of about one-half foot above
or below the annual mean stage and extreme fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 11/2 feet
above or below the mean lake level prevailing at the time.
    The estimate of cost of new work, revised in 1935, is $470,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate of annual cost of maintenance is $15,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for the north
breakwater (II. Doc. No. 62, 59th Cong., 1st sess.) ; act of January
21, 1927, provided for preserving the south pier as part of the
project, for the turning basin, and eliminated the proposed south
breakawter (IH. Doc. No. 475, 68th Cong., 2d sess.); act of August
30, 1935, provided for the present channel dimensions (Rivers and
Harbors Committee Doc. No. 47, 74th Cong., 1st sess.). For latest
published map see the last-mentioned document.
    Terminal facilities.--These consist of several wharves used for
handling coal, building material, fish, and miscellaneous commod-
ities. The city has provided a public wharf with warehouse. The
  acilities :are :considered adequate for existing commerce.
1212      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year.-Operations consisted
of dredging 75,115 cubic yards for restoration of 20-foot depth at
a cost of $15,040.36. Placing 1,222 tons of stone as riprap along
the south pier cost $4,425.53. Borings were taken at a cost of
$353.57. All work was done by hired labor and use of Govern-
ment plant. The total cost was $19,819.46 for maintenance. The
total net expenditures were $13,125.01.
   Condition at end of fiscal year.-The project in effect prior to
the modification of August 30, 1935, was completed in 1931 at a
saving of $72,723 under the estimated cost. The north breakwater
was completed in 1915, the south pier in 1904 and the dredging of
turning basin and entrance channel under the old project in 1931.
No work has been done on the last modification of the project pro-
viding for widening and deepening the entrance channel to 25- and
21-foot depths. The pier and breakwater are in good condition.
The inner 260 feet of the south pier has been entirely removed and
replaced with a revetment by private interests under permit granted
July 16, 1931, by the Secretary of War. The pier is therefore
maintained only for a length of about 2,490 feet. The controlling
depth at low-water datum at the close of the fiscal year was 20 feet
in the entrance channel and turning basin, except for minor scat-
tered shoals with least depth of 19.2 feet. Sheboygan River is
navigable for a distance of about 2.4 miles above its mouth for
craft drawing not more than 2 feet. The costs under the existing
project are $424,277.39 for new work and $475,818.59 for mainte-
nance, a total of $900,095.98. The total expenditures are $890,595.52.
  Proposed operations.-The balance unexpended, together with
allotments of $67,500 made during July 1937, less a revocation of
$2,000, will be applied as follows:
Accounts payable June 30, 1937---------------------------------        $9, 572.02
New work: Deepening entrance channel by contract, summer and
  fall of 1938-------------------------------------------- ----- 45,000.00
Maintenance:
     Operation of U. S. hopper dredge Meade, and U. S.
       dipper dredge Kewaunee, about May-June, 1938_ $16, 076.25
     Riprap breakwater and pier with United States
       plant, 3,000 tons, at $3.30, during August-Novem-
       ber 1937, and May 1938------       ----------------- 9, 900. 00
                                                                       25, 976. 25

        Total ---------------------       ------------ ___ _ 80, 548. 27
   Dredging is required annually for maintenance of project dimen-
sions of channel. The breakwater and pier require additional riprap.
The additional sum of $20,000 can be profitably expended during the
fiscal year ending June 30, 1939, as follows:
Maintenance:
   Operation of U. S. dipper dredge Kewaunee, and U. S. hopper
       dredge Meade, spring of 1939__________________ _--__ _____          $16,700
    Riprap breakwater and peir, 1,000 tons, at $3 30, with United States
      plant, summer and fall of 1938____________________________            3, 300
        Total        -
                     _-_ --   ____   _   __--_-        -                   2". COO
             RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                           1213
                                    Cost and financial summary
Cost of new work to June 30, 1937---------------------------                                               $912, 094. 03
Cost of maintenance to June 30, 1937---------------------                                                   562,950. 05

      Total cost of permanent work to June 30, 1937------------ 1,475, 044. 08
Undistributed costs June 30, 1937------------------------------         71. 56

     Net total cost to June 30, 1937--                         1, 475, 115. 64
Minus accounts payable June 30, 1937--------------------------      9, 572. 02

           Net total expenditures ___                                                                   1,465, 543. 62
Unexpended balance June 30, 1937__-------------------                                                          15,048. 27

           Total amount appropriated to June 30, 1937-----------                                        1, 480, 591. 89

           Fiscal year ending June 30            1933          1934             1935                1936            1937


Cost of new work------------------------- ----------- -----------             ---------     -----------------------
Cost of maintenance-___-------------- ----. $34, 372. 65 $39, 503. 29        $21, 897. 50       $23, 997. 16     $19, 819. 46
Total expended                                 36, 150. 52   43, 944. 75      24, 135.00         18, 706. 82       13, 125.01
Allotted                                       48, 550. 00   42, 500.00       34, 000.00         21, 000.00       -2, 500. 00


Balance unexpended July 1, 1936--------------------------------                                             $30, 673. 28
Deductions on account of revocation of allotment-----------------                                             2, 500. 00

      Net amount to be accounted for--------------------------                                                 28,173. 28
Gross amount expended---                                                                                           125. 01
                                                                                                               1--------------------------13,

      Balance unexpended June 30, 1937------------------                                                       15, 048. 27
Outstanding liabilities June 30, 1937 -----          ------
                                            ____- ----------                                                    9,572 02

     Balance available June 30, 1937_ _-                                                                        5, 476.25
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------------------------                                                    67, 500. 00

           Balance available for fiscal year 1938___ _                     ___--__-_
                                                                                 -_                        '72, 976. 25
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 2--   ____------__------                  ----                  _       _          20,0 00.00
  1 Includes $2 000 revoked during July 1937.
  2 Exclusive of available funds.

                          14. PORT WASHINGTON HARBOR, WIS.
  Location.-On the west shore of Lake Michigan, distant about 53
miles south from Manitowoc and about 29 miles north from Mil-
waukee (see U. S. Lake Survey Chart No. 74).
  Previous projects.-The original project was adopted by the River
and Harbor Act of July 11, 1870, and was modified by the River
and Harbor Act of August 14, 1876. The cost and expenditures prior
to the commencement of the existing project in 1910 were $188,495.08
for new work, $15,123.46 for maintenance, a total of $203,618.54.
 (For further details see p. 1938 of Annual Report for 1915.)
   Existing project.-This provides for a north breakwater and shore
connection approximately 2,537 feet long, extending from the shore
about 1,350 feet north of the remaining portion of the old north
pier; removal of 650 feet of the north pier; for extending a privately
owned south breakwater about 456 feet into the lake to form an
entraice about 350 feet in width, and for an outer turning basin 750
feet wide and 21 feet deep with an entrance channel about 2,400 feet
long and 21 feet deep through the south side of the basin, the width
being 110 feet at the inner end of the north pier and about 275 feet at
1214    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the harbor entrance, leading to two interior basins 18 feet deep, the
west basin being 140 feet wide and 490 feet long and the north basin
190 feet wide and 750 feet long. The north breakwater is formed of
concrete caissons and the shore connection of interlocking steel sheet
piling of the cellular and single wall types. The south breakwater
is formed of concrete caissons and rubble mound. The north stub
pier is formed of stone-filled cribs about 93 feet of which at the
inner end is capped with rubble superstructure.
   The project depth referred to is low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water lever are seasonal changes of about one-half foot above
or below the annual mean stage, and extreme fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 11/2 feet
above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1935, was $875,000,
exclusive of the amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided for the north pier and
the south basin (H. Ex. Doc. No. 28; 41st Cong., 2d sess.); act of
Au ust 14, 1876, provided for the north basin (Annual Report for
1876, pt. 2, p. 379); act of August 30, 1935, provided for the north
breakwater, removal of 650 feet of the north pier, the outer turning
basin, present channel dimensions, and extension of the south break-
water (H. Doc. No. 168, 72d Cong., 1st sess., and Rivers and Harbors
Committee Doc. No. 41, 74th Cong., 1st sess.). Prior to adoption by
the River and Harbor Act of 1935, the modification contained in
House Document No. 168, Seventy-second Congress, first session, had
been authorized by the Public Works Administration September 6,
1933. For the latest published map see the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are two coal and building material
wharves and several fishing wharves. The city has provided a
wharf with warehouse which is open to public use. These facilities
are considered adequate for existing commerce.
   Operationsand results during fiscal year.-Operations consisted of
constructing, by contract, an extension of 456 linear feet to the pri-
vately owned south breakwater, to form an entrance about 350 feet
in width, at a cost of $185,267.89. Soundings were taken at a cost
of $672.12. Placing 2,443 tons of stone as riprap along the north
breakwater cost $11,630.55. All work, except construction of the south
breakwater extension, was done by hired labor and use of Government
plant. The total cost was $197,570.56 of which $185,267.89 was for
new work and $12,302.67 for maintenance. The total net expenditures
were $192,288.11.
   Condition at end of fiscal year.-The existing project was completed
in 1936 at a saving of $64,291 under the estimated cost. The north
breakwater, north pier removal, and dredging was completed in 1934,
and the south breakwater in 1936. The breakwaters are in good con-
dition. The original south pier, completed in 1893, was entirely re-
moved in 1932 by private interests under permit granted October 25,
1930, by the Secretary of War and replaced with a coal wharf. A
south rubble mound breakwater about 550 feet long was constructed
in 1934 by private interests as an extension of their coal wharf in
accordance with local cooperation requirements of House Document
             RIVERS AND HARBORS-MILWAUKEE,                                         WIS., DISTRICT                1215
No. 168, Seventy-second Congress, first session. The controlling depth
at low-water datum at the close of the fiscal year was 20 feet in the
Government entrance channel and turning basin. The west interior
basin had a controlling depth of 17.6 feet and the north basin 18 feet.
The area between the south line of the Government entrance channel
and the harbor face of the private coal wharf, which is maintained
by private interests, had a controlling depth of 18.2 feet. The costs
under the existing project from regular funds are $207,714.19 for
new work and $102,583.14 for maintenance, a total of $310,297.33.
The total expenditures are $307,001.90.
   The cost under the existing project from Public Works funds is
$602,994.45 for new work. The total expenditures are $602,994.45.
   The total costs, all funds, are $810,708.64 for new work and
$102,583.14 for maintenance, a total of $913,291.78. The total expen-
ditures are $909,996.35.
   Proposed operations.-The balance unexpended, together with an
allotment of $12,000, made during July, will be applied as follows:
Accounts payable June                    30, 1937 ....            .----                                      $3, 677. 87
Maintenance :
    Operation of U. S. dipper dredge Kewaunee, about August 1937
      and May 1938     ----------------------------------------- 6, 601. 69
    Riprap breakwaters with United States plant, 2,000 tons, at
      $3.30, during August-October 1937 and June 1938----------- 6,600. 00
        Total----------------------- -------------------------- 16, 879.56
   Dredging is required annually for maintenance of project dimen-
sions of channel. The breakwaters require riprap. The additional
sum of $12,000 can be profitably expended during the fiscal year
ending June 30, 1939, as follows:
Maintenance :
   Operation of U. S. dipper dredge Kewaunee, during spring of 1939_ $5, 400
   Riprap breakwaters, 2,000 tons, at $3.30, with United States plant,
      during the summer and fall of 1938---------------------------- 6,600

              Total----------------------------------------------------                                          12,000
                                          Cost and financial summary
Cost of new work to June 30, 1937--------------------------                                              1$999, 203. 72
Cost of maintenance to June 30, 1937-------------------------                                               117, 706. 60

      Total cost of permanent work to June 30, 1937-----------                                           1, 116, 910. 32
Undistributed costs June 30, 1937_-----------------------------                                                  382. 44

     Net total cost to June 30, 1937-----------------------1, 117, 292. 76
Minus accounts payable June 30, 1937-----------------_ _        3,677. 87

     Net total expenditures-----------------------                                                      11,113, 614. 89
Unexpended balance June 30, 1937------- ---------------------                                                4,879. 56

           Total amount appropriated to June 30, 1937-----------                                        11, 118, 494. 45

   Fiscal year ending June 30                1933              1934            1935            1936             1937


Cost of new work ------------------------
                  .                                       . $197, 348.02    $405, 646. 43 ----------.         $185, 267. 89
Cost of maintenance---------------          $7, 306. 87           946. 31        214. 62      $2, 285. 96       12, 302. 67

      Total cost- -    - - - - --   --       7, 306. 87      198, 294. 33    405, 861. 05      2, 285. 96      197, 570. 56
Total expended....--------------             5, 749. 78      184, 194. 25    421, 780. 41      3, 927. 52      192, 288. 11

Allotted       -------------------           1,900. 00       596,900. 00      11, 994. 45    210,000.00        -16, 000. 00

  1 Includes $602,994.45, Public Works funds.
           20196---.37-t. 1-77
1216      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936-----------------------------                   $213, 167.67
Deductions on account of revocation of allotment-------------                    16, 000. 00

      Net amount to be accounted for- -___-----____--             -    -        197, 167. 67
Gross amount expended------------------------_                $193, 673. 90
Less reimbursements collected--------------------                 1, 385. 79
                                                                                192, 288. 11

      Balance unexpended June 30, 1937________---- __---------                    4, 879. 56
Outstanding liabilities June 30, 1937----- -------------------                    3, 682. 87

     Balance available June 30, 1937_______-------_--------                       1, 196. 69
Amount allotted from War Department Civil Appropriation Act
                       --------------------------------------
approved July 19, 1937_                                                         12,   0.00

       Balance available for fiscal year 1938__-_-_-__-----     ------           13, 196. 69

Amount that can be profitably expended in fiscal year ending
  June 30, 1939 for maintenance       2_   _---___---                            12, 000. 00
  2Exclusive of available funds.

                         15. MILWAUKEE HARBOR, WIS.

   Location.-On the west shore of Lake Michigan, distant about 85
miles northerly from Chicago and about 83 miles west of Grand
Haven, Mich. (See U. S. Lake Survey Chart No. 743.)
  Previous projects.-The original project for improvement of Mil-
waukee Harbor was adopted by act of March 3, 1843, and modified
by River and Harbor Acts of August 30, 1852, April 10, 1869, and
March 3, 1899. The original project for the harbor of refuge was
adopted by River and Harbor Act of March 3, 1881. The project
of June 13, 1902, consolidating the harbor and harbor of refuge
was modified by River and Harbor Act of March 3, 1905. The
total cost and expenditures on the harbor and harbor of refuge prior
to the commencement of the existing project in 1907, but including
an expenditure of $14,633.85, made under the abandoned project of
1910 for widening rivers and dredging turning basins, were $1,293,-
220.26 for new work, $459,305.16 for maintenance, a total of
$1,752,525.42. For further details see page 1938 of Annual Report
for 1915.
  Existing project.-This provides for a north breakwater 9,961 feet
long and a south breakwater 9,671 feet, more or less, in length, ex-
tending to the shore, thereby forming a protected basin in which is
being developed a commercial harbor by the city of Milwaukee,
the width of entrance between the two breakwaters being about 500
feet. It further provides for the protection of the river mouth by
two piers, 360 feet apart at the outer ends and 550 feet apart at
the shore line, 1,656 and 1,608 feet in length for the north and south
piers, respectively; for a channel 21 feet deep, extending from that
depth in the lake to the mouth of the river, a total length of about
2,850 feet, the width of channel outside the piers to be 600 feet;
dredging to 21 feet, a portion of the outer harbor between East
Wisconsin Avenue extended and East Bay Street extended, and
easterly of a line 50 feet lakeward of the pierhead line; and the
abandonment of so much of the previous project as related to
dredging inside the shore line for the formation of turning basins
and widening channels. The breakwaters are formed of stone-filled
       RIVERS AND HARBORS-MILWAUKEE,            WIS., DISTRICT    1217

timber cribs and concrete caissons, all of which are capped with
concrete superstructure. The inner entrance piers are formed of
concrete caissons, stone-filled timber cribs, and piling, and are also
provided with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of about one-half foot above
or below the annual mean stage and extreme fluctuations of a tempo-
rary nature, due to the wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1935, is $4,663,000
exclusive of the amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $63,000.
   The existing project was authorized by the following river and
harbor acts: The Act of August 30, 1852, provided for the north pier
 (S. Doc. No. 175, 25th Cong., 2d sess.) ; act of March 3, 1899, pro-
vided for the 19-foot channel dimensions (H. Doc. No. 61, 54th
Cong., 2d sess.) ; act of March 3, 1881, provided for the inner 7,600
feet of the breakwater (Annual Report for 1881, p. 2122) ; act of
March 2, 1907, provided for the south pier (Annual Report for
1906, p. 1752), and also provided for extending the breakwater 1,000
feet without prior survey or estimate; act of September 22, 1922,
provided for extending north breakwater, for a south breakwater,
and for the present project dimensions of the channel (H. Doc. No.
804, 66th Cong., 2d sess.); the act of August 30, 1935, provided for
dredging the outer basin 21 feet deep (H. Doc. No. 289, 72d Cong.,
1st sess.).    For latest published map see the last-mentioned
document.
   Local cooperation.-The dredging in the outer basin is subject to
the condition that the original dredging be done by the city of Mil-
waukee, and the city of Milwaukee be reimbursed at not to exceed 10
cents per cubic yard place measurement for original dredging done
subsequent to the authorization of the work by Congress. Agreement
covering the dredging was executed by the Secretaary of War Febru-
ary 23, 1934, after this work was originally authorized as part of the
Public Works program. All prior requirements have been complied
with.
   Terminal facilities.-Besides four car-ferry slips, there are numer-
ous wharves, private and municipal, used for the handling of coal,
grain, building materials, cement, and miscellaneous commodities.
As these facilities are considered inadequate for existing commerce,
the Milwaukee Harbor Commission is engaged in building an outer
harbor.
   Operations and results during fiscal year.-Operations consisted
of dredging 53,412 cubic yards for restoration of project depth in the
entrance channel at a cost of $17,807.38. Repairs to concrete super-
structure on north breakwater cost $9,433.69. Stone placed as riprap
along the south breakwater, during the previous fiscal year, in-
volved a cost of $501.71. Placing 1,000 tons of stone for riprap
along the south breakwater cost $2,668.54. All work was done by
hired labor and use of Government plant. The total cost was $30,-
411.32 for maintenance. The total net expenditures were $26,896.31.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 30, 1935, was completed in 1934 at a saving
of $37,188 under the estimated cost. The north breakwater was
1218       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

completed for a length of 8,210 feet in 1909 and the extension of
1,751 feet in 1925, making the total length 9,961 feet. The north pier
was completed in 1905 and the south pier in 1910. The south break-
water was completed in 1929 except for placing additional riprap
and repairing about 756 feet damaged by a storm of October 22-23,
1929. Rebuilding the damaged section of the breakwater and the
placing of additional riprap was completed in 1932. The south shore
connection was completed in 1928. Dredging operations for deep-
ening and widening entrance channel were completed in 1930. Plac-
ing additional small stone around the caisson breakwaters to chink
the voids in the large riprap was completed in 1934. No work has
been done on deepening the outer harbor frontage to 21 feet north of
the inner-entrance piers. Prior to the last modification of the project
the city of Milwaukee dredged the area in the outer harbor south
of the inner-entrance piers and lakeward of the pierhead line to more
than 21 feet below datum without cost to the United States.
   The concrete superstructures on the timber crib sectioh of the north
breakwater and on the harbor piers are showing some disintegration,
but not to such extent as to endanger the structures. The south
breakwater and shore connection, are in good condition. The con-
trolling depth at low-water datum at the close of the fiscal year
was 21.5 feet in the entrance channel through the outer basin and over
a middle width of 300 feet between the inner piers. The costs under
the existing project are $4,537,812.20 for new work, $662,508.19 for
maintenance, a total of $5,200,320.39. The total expenditures are
$5,196,600.35.
   Proposed operations.- The balance unexpended, together with
allotments of $53,500 made during July 1937, will be applied as
follows:
Accounts payable June 30, 1937                   -_______-______
                                                         ____________---_ $3,972.66
New work: Dredging in outer harbor by city of Milwaukee by con-
  tract and reimbursement (in part) by the United States during
  the fiscal year 1938____________------------------------------------------    25,000. 00
Maintenance :
     Operation of U. S. dipper dredge Kewaunee, about
       July 1937, and" May-June, 1938_------------------- $20, 760. 05
     Riprap breakwaters with United States plant, 6,000
       tons, at $3.25, during the fall of 1937 and spring
       of 1938-------------------     ---------------------- 19, 500. 00
     Continue repairs to concrete superstructure on
       breakwaters by hired labor during the fiscal year__           6, 500. 00
                                                                                46, 760. 05

       Total-----------            ----------------------------------              75, 732.71
   Dredging is required annually for maintenance of project dimen-
sions of channel. Additional stone is required for rip-rapping the
breakwaters. The concrete superstructure on the breakwaters re-
quires further repairs. The additional sum of $27,500 can be profit-
ably expended during the fiscal year ending June 30, 1939, as follows:
Maintenance:
   Operation of U. S. dipper dredge Kewaunee, during the spring of
     1939 ------------ _----------------$9,                                 500
   Riprap breakwaters, 4,000 tons, at $3.25, with United States plant,
      during the summer and fall of 1938, and spring of 1939------ -13, 000
   Continue repairs to concrete superstructure on breakwaters with
      United States plant during the fiscal year------         --    -__ 5, 000
         Total-        -                             _---------_--      _--_--   _--_-27, 500
            RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                                         1219
                                        Cost and financial summary
Cost of new work to June 30, 1937____________                                                                     $5,831,032.46
Cost of maintenance to June 30, 1937________________                                                   _            1, 121, 813. 35

         Total cost of permanent work to June 30, 1937                                   --                         6, 952, 845. 81
Undistributed costs June 30, 1937__ ____                                   _ ____--           -   -                             252. 62

         Net total cost to June 30, 1937_______________                                                             6, 953,098. 43
Minus accounts payable June 30, 1937__________                                                                           3, 972.66

         Net total expenditures__________________                                                                   6, 949, 125. 77
Unexpended balance June 30, 1937__                                     _                                                22,232.71

         Total amount appropriated to June 30, 1937_                                                                6, 971, 358. 48

     Fiscal year ending June 30                 1933                 1934              1935                      1936            1937


Cost of new work ....        __              $211, 220.08         $16, 882. 33
Cost of maintenance -                 .---      8, 855. 44          4, 299. 17              33
                                                                                      $28,020.          $11, 057. 14       $30, 411.32
      Total cost----       __ --              220,075.52           21, 181. 50         28, 020.33         11, 057. 14           30, 411. 32
Total expended ..    ..    .--     .-----     122, 847. 79        -50, 771. 28    -1,032, 940. 94         13, 477. 79           26,896 31
                                                        _l~i~--   5~1--102(              1~0~         ........              ,       9   3
Allotted- __.- ...-- ...--........-          -38, 386.06     I -157,    941. 70   -- 1,080,468.00         41, 900. 00     -12; 500. 00


Balance unexpended                July 1, 1936________________                                                          $61, 629.02
Deductions on account of revocation of allotment-                                                                        12, 500. 00

      Net amount to be accounted for_________                                                                            49, 129. 02
Gross amount expended_____-- __-- __-------_----                                        $26,990. 61
Less reimbursements                collected_________________                                     94. 30
                                                                                                                         26, 896. 31

Balance unexpended June 30, 1937___________________                                                                      22, 232. 71
Outstanding liabilities June 30, 1937_                                                                                    3, 972. 92
     Balance available June 30, 1937____________________                                                                 18, 259. 79
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_______--------                                                                                   53, 500. 00
         Balance available for fiscal year 1938_                                                                         71, 759. 79
Amount (estimated) required to be appropriated for completion
of existing project 1 _._._._._._                                                                                      100, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1                                                                                        27, 500. 00
1Exclusive of available funds.
                                       16. RACINE HARBOR, WIS.

   Location.-On the west shore of Lake Michigan, distant about 26
miles southerly from Milwaukee and about 64 miles northerly from
Chicago. (See U. S. Lake Survey Chart No. 745.)
   Previous projects.-The original project was adopted by the citi-
zens of Racine about 1842 or 1843. The citizens' project was modi-
fled by acts of June 23, 1866, March 3, 1899, and June 13, 1902. The
cost and expenditures by the United States prior to the commence-
ment of the existing project in 1907 are $427,239.97 for new work,
$79,536.95 for maintenance, a total of $506,776.92. For further de-
tails, see page 1939 of Annual Report for 1915.
   Existing project.-This provides for two breakwaters extending
from the shore on either side of the mouth of Root River, 2,640 feet
and 2,652 feet in length for the north and south breakwaters, respec-
1220     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

tively; for a channel 19 feet deep, with suitably increased depth at
the entrance, extending from that depth in the lake through the
outer harbor to the mouth of the river, a total length of about 1,900
feet, with a width of about 825 feet; for a channel 19 feet deep in
Root River from the river mouth to below the Fourth Street Bridge,
a distance of about 3,600 feet, with widths of 190 feet at the mouth,
reducing to 95 feet at the upper end, with intermediate reductions
and enlargements; and removal of shoals, about one-half mile lake-
ward of the harbor entrance, to a minimum depth of 25 feet. The
breakwaters are formed of stone-filled timber cribs, concrete caissons,
and piling, all being capped with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure, of
about 11/2 feet above or below the mean lake level prevailing at the
time.
   The estimate of cost for new work, revised in 1937, is $726,000,
exclusive of the amounts expended on previous projects and exclu-
sive of inner 300 linear feet of pile pier and 450 linear feet of rubble
mound, no longer considered necessary. The latest (1937) approved
estimate for annual cost of maintenance is $14,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907 (H. Doc. No. 62, 59th Cong.,
1st sess.) and the act of June 25, 1910 (Annual Report for 1909, p.
1973), provided for the breakwaters; the act of August 26, 1937,
provided for removal of shoals lakeward of harbor entrance, present
project dimensions of channel through the outer basin and for the
channel in the river (Rivers and Harbors Committee Doc. No. 46,
75th Cong., 1st sess.). For the latest published map see the last-
mentioned document.
   Local cooperation.-The act cf August 26, 1937, provided that the
dredging in Root River shall not be undertaken until local interests
have released the United States from all claims for damages to
land and structures attributable to the work of improvement, and
have given assurances satisfactory to the Secretary of War that
they will dredge vessel berths to a depth sufficient for full utiliza-
tion of the proposed Federal improvement and that they will pro-
vide and maintain suitable public wharf and terminal facilities on
the river, open to the public on equal terms. No action on compli-
ance has been taken.
   Terminal facilities.-These consist of of six coal wharves, a ce-
ment wharf, and two fishing wharves. These facilities are consid-
ered adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted
of dredging 79,158 cubic yards, by hired labor and use of Govern-
ment plant, for restoration of project depthl, at a total cost of $15,-
163.14 for maintenance. The total net expenditures were $8,544.19.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 26, 1937, was substantially completed in
1924 at a saving of $50,180 under the estimated cost. The north
breakwater and shore connection and north pier removal were com-
        RIVERS AND HARBORS-MILWAUKEE,                               WIS., DISTRICT             1221
pleted in 1915. The south breakwater and shore connection, south
pier removal, and dredging were completed in 1924. No work
has been done on the last modification of the project providing for
removal of shoals, widening channel through outer basin, and dredg-
ing the river channel.      The concrete superstructure on north
breakwater and shore connection is showing some distintegration,
but not to such an extent as to endanger the structures. The south
breakwater and shore connection are in good condition. 'Zhe con-
trolling depth at low-water datum at the close of the fiscal year was
21.5 feet over a midchannel width of 470 feet through the outer basin
and 14.2 feet in river to Fourth Street. The costs under the existing
project are $653,020.04 for new work and $271,382.37 for mainte-
nance, a total of $924,402.41.          The total expenditures are
8918,061.38.
   Proposed operations.-The balance unexpended, together with an
allotment of $18,000 for maintenance on July 20, 1937, will be ap-
plied as follows:
Accounts payable June 30, 1937-------------------------------     $6,384.44
Maintenance :
   Operation of U. S. dipper dredge Kewaunee, about June, 1938__ 14,238. 29
   Large riprap for breakwaters with United States plant, 2,700
      tons at $3.50 during August-October 1937-_           _.- __  9, 450. 00

            Total                                  --------   ----------                  30, 072. 73

  The shoals in Lake Michigan should be removed, the entrance
channel in outer harbor should be widened, and the river should be
dredged as soon as local cooperation has been complied with and
funds become available. Dredging is required annually for mainte-
nance of project dimensions of channel. Additional riprap is re-
quired for the breakwaters. The additional sum of $90,600 can be
profitably expended during the fiscal year ending June 30, 1939,
as follows:
New work: Removing shoals about one-half mile lakeward of harbor
  entrance to a minimum depth of 25 feet; widening basin in outer
  harbor to a width of 825 feet and dredging a channel 19 feet deep
  in Root River from the mouth to below Fourth Street Bridge, by
  contract, summer and fall of 1938                                  72, 600
                                                                    $-------------------
Maintenance :
    Operation of U. S. dipper dredge Kewaunee, during the
      spring    of   1939__---------------                                       $14, 000
    Large riprap for breakwaters, 1,000 tons at $4, with
      United States plant during the summer of 1938........                        4, 000
                                                                                              18, 000
        Total ----------------------------------                                              90, 600
                            Cost and financial summary

Cost of new work to June 30, 1937----------------                                  $1, 080, 260. 01
Cost of maintenance to June 30, 1937------------------------                           350, 919. 32
      Total cost of permanent work to June 30, 1937 -- --                              1, 431, 179. 33
Undistributed costs June 30, 1937_...
                                  _-----     ----------- --                        1            43. 41
     Net total cost to June 30, 1937--------------------------                         1, 431, 222. 74
Minus accounts payable June 30, 1937------------------------                                6, 384. 44
     Net total expenditures-----
                         _                 -------                                     1,424, 838. 30
Unexpended balance June 30, 1937----------                                 ---            12, 072. 73
      Total amount appropriated to June 30, 1937__----                                 1,436, 911. 03
1222           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


          Fiscal year ending June 30             1933               1934            1935            1936                1937


Cost of new work------
Cost of maintenance ---------                 $10, 045. 20        $6, 978. 38   $13, 214. 21      $1, 872. 80         $15, 163.14
Total expended____________----------------      5, 133. 52        11, 934. 30      3, 730. 36     11, 347. 11           8, 544. 19

Allotted _____________---------3,                 830. 24         18, 500. 00     11, 500.00       7, 000. 00             500.00


Balance unexpended July 1, 1936_                              _---                                              $20, 116.92
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936G_ _____--_-                                                                                 9, 500. 00
          Amount to be accounted for______________________                                                      29,    616.    92

Deductions on account of revocation of allotment--______                                                         9, 000. 00
          Net amount to be accounted for_                                                                        20, 616.92
Gross amount expended __--                                                                                        8, 544. 19
          Balance unexpended June 30, 1937                   --                                                 12, 072. 73
Outstanding liabilities June 30, 1937______                                ____                                  6, 384. 44
     Balance available June 30, 1937_                                                                             5, 688. 29
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937____ _______                                                                             18, 000. 00
          Balance available for fiscal year 1938__                         ____            ____                 23, 688. 29

Amount (estimated) required to be appropriated for completion
of existing project 2__                             ___                                                        72, 600. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939:
   For new work 1            ___                                                                                72, 600. 00
   For maintenance 1                                                                                            18, 000. 00
                                   -
           Total             --                                                                                 90, 600. 00
   1 Exclusive of available funds.

                                       17. KENOSHA HARBOR, WIS.

   Location.-On the west shore of Lake Michigan distant about 35
miles southerly from Milwaukee and about 54 miles northerly from
Chicago. (See U. S. Lake Survey Chart No. 747.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of August 30, 1852, and modified by River and
Harbor Acts of June 23, 1866, September 19, 1890, March 3, 1899, and
June 13, 1902. The cost and expenditures prior to commencement of
the existing project in 1907 were $453,839.49 for new work, $21,818.17
for maintenance, a total of $475,657.66. For further details see page
1939 of Annual Report for 1915.
   Existing project.-This provides for a detached breakwater 796
feet long, for two parallel piers about 250 feet apart, 1,077 and 1,872
feet in length for the north and south piers, respectively, and for a
channel 200 feet wide and 21 feet deep, from that depth in the lake
a distance of 2,750 feet to an interior basin 21 feet deep. The break-
water is formed of stone-filled cribs; the piers are formed of stone-
filled cribs and piling. The entire north pier, 1,175 feet of the south
pier, and the entire breakwater are capped with concrete super-
structure.
   The project depths are referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York. The
             RIVERS AND HARBORS-MILWAUKEE,                                       WIS,,      DISTRICT            1223
fluctuations of water level are seasonal changes of about one-half foot
above or below the annual mean stage, and extreme fluctuations of a
temporary nature, due to wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1935, was $71,550,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $9,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for the parallel
piers, for 600 feet of breakwater, and for depths of 19 and 18
feet in the channel and basin, respectively (H. Doc. No. 328, 54th
Cong., 2d sess., and H. Doc. No. 164, 55th Cong., 3d sess.); act of
March 2, 1907, provided for extending the breakwater 200 feet (H.
Doc. No. 62, 59th Cong., 1st sess., and Rivers and Harbors Committee
Doc. No. 3, 59th Cong., 2d sess.); the present project depths of the
channel and basin were authorized May 28, 1935, by the Emergency
Relief Appropriation Act of 1935, and adopted by the River and
Harbor Act of August 30, 1935 (Rivers and Harbors Committee Doc.
No. 19, 74th Cong., 1st sess.). For latest published map see the last-
mentioned document.
   Terminal facilities.-There are six wharves used for handling coal,
building materials, automobiles, and miscellaneous commodities, and
also several fishing wharves. While these facilities are considered
generally adequate for existing commerce, more efficient use of exist-
ing terminals and utilization of available frontage for development
of additional terminals should be made.
   Operations and results during fiscal year-Regularfunds.-Opera-
tions consisted of dredging 30,997 cubic yards, by hired labor and use
of Government plant, for restoration of project depth at a total cost
of $8,940.01. The total net expenditures were $8,886.99.
   Emergency Relief funds.-Dredging done during the previous fiscal
year, by contract, to obtain new project depth in the entrance channel
and interior basin, involved a cost of $0.50 for new work. The total
net expenditures were $0.50.
   The total cost, all funds, was $8,940.51, of which $0.50 was for new
work and $8,940.01 for maintenance. The total net expenditures
were $8,887.49.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936 at a saving of $3,340 under the estimated cost. The
north pier was completed in 1895, the south pier in 1900, the break-
water in 1909, and the dredging in 1936. The piers and breakwater
are in good condition. The south revetment requires repairs. The
controlling depth at low water datum at the close of the fiscal year
was 21 feet in the entrance channel and inner basin.
   The total costs under the existing project to June 30, 1937, were
as follows:

                                                                          New work       Maintenance         Total

'Regular funds_ .-----------------------------------                       $40, 553. 04    $328, 121. 84    $368, 674. 88
Emergency Relief funds ---------------------------------                   27, 658. 00 --------------...     27, 658. 00
      Total .                              ------
                            .------------------             ------   --     68,211.04       328,121.84       396,332.88
1224         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The expenditures were $368,674.88, regular funds and $27,658
Emergency Relief funds, a total of $396,332.88.
   Proposed operations.--The balance unexpended, together with an
allotment of $8,500 for maintenance on July 20, 1937, less a revoca-
tion of $2,000 made during July, $8,951.21, will be applied to main-
tenance operation of U. S. hopper dredge Meade, about April 1938.
   Dredging is required annually for maintenance of project dimen-
sions of channel. Additional riprap is required for the break-
water. The additional sum of $11,000 can be profitably expended
during the fiscal year ending June 30, 1939, as follows:
Maintenance:
   Operation of U. S. hopper dredge Meade, during the spring of 1939__ $9, 020
   Riprap breakwater, 600 tons, at $3.30, with United States plant
                                ----
      during the summer of 1938___     _______-__-__------_-_ -         1, 980

            Total---------------------------------------                                                           11,000
                                      Cost and financial summary
                             MAINTENANCE         AND       IMPROVEMENT            FUNDS


Cost of new work to June 30, 1937________
                                   ----                                  -      -
                                                                               ________--  -          _ $494, 392. 53
Cost of maintenance to June 30, 1937_-____----_---                               ___-----           __ 349, 940. 01
         Total cost of permanent work to June 30, 1937-------------                                         844, 332. 54

Net total expenditures ----------------------------------------                                            844, 332. 54
Unexpended balance June 30, 1937________-- ____--------------                                                2, 451.21

         Total amount appropriated to June 30, 1937_______________                                          846, 783. 75

         Fiscal year ending June 30                1933             1934            1935            1936            1937

Cost ofnew work....---------I.
Cost of maintenance ..----------------- $4,044. 66
                                                                   ---------------$11, 421.21
                                                               $45, 456. 44                        __              $8,940. 01
Total expended--.----------------           --    6, 291. 54     46, 944. 43      12. 076. 15      -$96. 80         8, 886.99

Allotted----......--------..---------.....---     -150. 00       71, 761. 98     -6, 500. 00       8, 500. 00     -3, 500. 00


Balance unexpended July 1, 1936------------------------------ $14,838.20
Deductions on account of revocation of allotment--------------  3, 500. 00

     Net amount to be accounted for _________------__-                                                          11, 338. 20
Gross amount expended           _________                                                                        8, 886. 90

     Balance unexpended June 30, 1937   --------------                                                           2, 451.21
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------                                                    8,500. 00

     Balance available for fiscal year 1938________________----   110, 951. 21
Amount that can be profitably expended in fiscal year ending June
   30, 1939,     for maintenance 2_ _---_                      -------                                          11, 000.00
   1Includes $2,000 revoked in July 1937.
   2Exclusive of available funds.

                                       EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937__________                                                                 $27, 658.00
Cost of maintenance to June 30, 1937    ____                                     ____           _____
      Total cost of permanent work to June 30, 1937                                                             27, 658. 00
Net total expenditures-----
                       ......                                                                                   27, 658. 00
Total amount appropriated to June 30, 1937-......                                          -----                27, 658. 00
                 RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                                                           1225

            Fiscal year ending June 30                                          1933              1934              1935                 1936           1937

Cost of new work.                                        -        -                                            .-------...            27, 657. 50              $0. 50
Cost of maintenance              .---                                   -----
                                                                        I.            .                               ------------
                                                                                                              I------------                                -   -----

Total expended ....                                    ----                     ---        -
                                                                                          .--     ----------------                -   27, 657. 50                 .50
Allotted--......----------------------------------------                                                 -     $31,000. 00 ------------                 3,342.00


Balance unexpended July 1, 1936 -----------------       ------      $3, 342. 50
Deductions on account of revocation of allotments------- ---------- 3, 342. 00

      Net amount to be accounted for                                                                                                                             50
                                                                                                                                                                .--------------
Gross amount expended_---------------------                                                                    ---------------------                            .50

          CONSOLIDATED COST AND FINANCIAL SUMMARY                                                        FOR KENOSHA                  HARBOR,       WIS.


Cost of new work to June 30, 1937-----------------------------$522, 050. 53
Cost of maintenance to June 30, 1937--------------------------   349, 940. 01

            Total cost of permanent work to June 30, 1937                                                                    __                 871, 990. 54

Net total expenditures_ _______-_____ __-_                                                                            _                         871, 990. 54
Unexpended balance June 30, 1937 ___________-__                                                                                           _       2,451. 21

            Total amount appropriated to June 30, 1937                                                                        ___               874, 441. 75

            Fiscal year ending June 30                                          1933              1934              1935                1936            1937


Cost of new work_ -                                                      ..---..
                                                                              __     .. _-$27, ....                657. 50                                 $0. 50
Cost of maintenance-....-                                                 $4, 044. 66 $45, 456. 44 $11,421. 21------------.                             8,940. 01
         Total cost......----.                 ......             -. 4, 044. 66                 45, 456. 44     11, 421. 21           27, 657. 50       8, 940. 51
Total expended---               _-_                                        6, 291. 54           46, 944. 43     12, 076. 15           27, 560. 70       8, 887. 49

Allotted           ...              ...------------------------------           150. 00         71, 761. 98     24, 500. 00            8, 500. 00     -6, 842. 00


Balance unexpended July 1, 1936                                                                                                                 18, 180. 70
                                                                                                                                                $-------------------
Deduction on account of revocation of allotment                                                                                                    , 842. 00
                                                                                                                                                 6-----------------

      Net amount to be accounted for-------------------                                                                       ____                   1, 338. 70
Gross amount expended--.----    -------------------------                                                                                            8 887. 49
     Balance unexpended June 30, 1937-----------------                                                                                               2,451. 21
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937____________________--
                               -______-                                                                                                              8, 500. 00
            Balance available for fiscal year 1938---------------------                                                                             10,951. 21
Amount that can be profitably expended in fiscal year ending
June 30, 1939; for maintenance -------------------------- _                                                                                        11, 000. 00
1 Includes $2,000 revoked in July 1937.
2 Exclusive of available funds.

                                            18. ST. JOSEPH HARBOR, MICH.

  Location.-Located on the east shore of Lake Michigan, distant
about 60 miles easterly from Chicago and about 24 miles southerly
from South Haven. (See U. S. Lake Survey Chart No. 758.)
  Previous projects.-The original project was adopted by the River
and Harbor Acts of July 4, 1836, and modified by the River and
Harbor Acts of June 23, 1866, March 3, 1875, June 14, 1880, and July
13, 1892. The cost and expenditures prior to commencement of work
under the existing project in 1900 were $503,113.23 for maintenance
1226    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and new work. (For further details see p. 1945 of Annual Report for
1915.)
   Existing project.-This provides for protecting the mouth of the
St. Joseph River by two piers, 250 to 325 feet apart at their inner
and outer ends, respectively, having lengths of 2,854 feet on the north
side and 2,603 feet on the south side; for a channel 21 feet deep from
Lake Michigan to the mouth of the Benton Harbor Canal, a length
of about 6,900 feet, and a turning basin of the same depth at the
mouth of the canal, having a width of 190 feet and a length of 325
feet; for 18 feet depth in the Benton Harbor Canal up to the west
line of Ninth Street, a length of about 3,600 feet, the width of
channel being about 265 feet at the outer end of the piers, 190 feet
at the inner end of the piers and revetments, increasing to 250 feet
below the turning basin; thence decreasing from 110 to 80 feet in
the canal. The piers and revetments are formed of timber cribs and
piling, the entire south pier and the entire north pier and revetment
having been repaired with concrete superstructure, and 500 feet of
the south revetment having been repaired with rubble superstructure.
   The project depths are. referred to low-water datum for Lake Mich-
igan, which is 578.5 feet above mean tide at New York.
   The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, revised in 1935, is $380,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $17,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1875, provided for interior revet-
ment (H. Ex. Doc. No. 160, 43d Cong., 2d sess.) ; the act of June 14,
1880, provided for the Benton Harbor Canal (Annual Report for
1880, pp. 2030, 2031, and 2049 to 2055) ; the act of March 3, 1899,
provided for the present dimensions of the piers and for the turning
basin (H. Doc. No. 307, 55th Cong., 2d sess., and Annual Report for
1898, p. 2496) ; and the act of August 30, 1935, provided for the
present channel and turning basin dimensions (Rivers and Harbors
Committee Doc. No. 52, 74th Cong., 1st sess.). The easterly 1,000
feet of the canal, above the west line of Ninth Street, was aban-
doned June 2, 1937 (Public No. 130, 75th Cong., 1st sess.). The
latest published map is in the last-mentioned document.
   Local cooperation.-The act of August 30, 1935, provided "that
local interests release the United States from liability from any
damages to existing docks, bulkheads, revetments, or other struc-
tures resulting from the work" of deepening and widening the chan-
nels in the river and the canal. Negotiations for compliance with
this requirement are in progress.
   Terminal facilities.-There are six wharves used for handling
coal, building materials, petroleum products, and miscellaneous com-
modities. A package freight terminal is also available for use.
While these facilities are generally adequate for existing traffic
conditions, a public wharf open for all on equal terms should be
provided.
              RIVERS AND HARBORS-MILWAUKEE,                                        WIS., DISTRICT                      1227
   Operations and results during fiscal year.-Operations consisted
of dredging 44,883 cubic yards by hired labor and use of Govern-
ment plant, for restoration of 18-foot depth at a total cost of
$12,737.60 for maintenance. The total net expenditures were
$12,735.34.
   Condition at end of fiscal year.-The project in effect prior to
the modification of August 30, 1935, was completed in 1907 at a.
saving of $76,906 under the estimated cost. Pier construction was
completed in 1904 and dredging under the old project in 1907. The
piers and revetments are in good condition. No work has been done
on the last modification of the project providing for widening and
deepening the channel and turning basin to 21- and 18-foot depths.
The controlling depths below low water datum at the close of the
fiscal year were 19 feet in the channel to Benton Harbor Canal and
17.8 feet in a narrow channel in Benton Harbor Canal. The costs
under the existing project are $303,093.38 for new work and $615,-
158.27 for maintenance, a total of $918,251.65. The total expendi-
tures are $918,220.15.
   Proposed operations.-The balance unexpended, together with allot-
ments of $89,000 made during July 1937, will be applied as follows:
Accounts payable June 30, 1937------------------  -------                                                            $31. 50
New work: Deepening harbor to project depths by contract, summer
                                   -----
   and fall of 1938------------------                                                                            75, 000. 00
Maintenance: Operation of U. S. hopper dredge Meade, about April-
May 1938-------------                                            14, 192. 70
           Total       ---        --------                                      ------                           89, 224. 20

   Dredging is required annually for maintenance of project dimen-
sions of channel. Minor repairs to the south pier are required. The
additional sum of $16,000 can be profitably expended during the fiscal
year ending June 30, 1939, as follows:
Maintenance :
                                                            --
    Operation of U. S. hopper dredge Meade, spring of 1939 _--- $15, 000. 00
   Minor repairs to south pier with United States plant during
      summer of 1938__ ---        ------------------------  _     1, 000. 00
             Total-----------------------------------------                                     -----            16, 000. 00
                                      Cost and financial summary
Cost of new work to June 30, 1937----------------------                                           -            $806, 206. 61
Cost of maintenance to June 30, 1937 --------------                                                             615, 158. 27
           Total cost of permanent work to June 30, 1937 ---                                ____----          1, 421, 364. 88
Minus accounts payable June 30, 1937----------------------------                                       ---             31. 50
     Net total expenditures-------------------------- -------                                                1, 421, 333. 38
Unexpended balance June 30, 1937-------------------------------                                                      224. 20
           Total amount appropriated to June 30, 1937---------------                                         1, 421, 557. 58

           Fiscal year ending June 30                1933           1934             1935              1936           1937


Cost of new work-----------        ----------- ------------ ------------ ------------ ----------- -
Cost of maintenance---..-.----------------      $18, 587. 98 $78,795.62 $16,361. 16 $12, 061. 99    $12, 737. 60

Total expended          _______------------------ 21, 955. 96    77, 924. 93      17, 596.32      11,991. 75         12, 735. 34
Allotted        _____ - .    -                      4, 850. 00   101, 700. 00      1, 000. 00     12, 500. 00
1228        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936---                                           $12, 959. 54
Gross amount expended----------------------------------------12,                 735. 34
      Balance unexpended June 30, 1937--------------------------                 224.20
Outstanding liabilities June 30, 1937-----------------------------                31. 50

     Balance available June 30, 1937  _____--_______          _-192.     70
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------------------------------------ 89, 000. 00
    Balance available for fiscal year 1938__        ----------------------    89, 192. 70
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1___  ---------------                             16, 000. 00
  1 Exclusive of available funds.

                         19. SOUTH HAVEN HARBOR, MICH.

   Location.-Located on the east shore of Lake Michigan, distant
about 77 miles northeasterly from Chicago and about 24 miles north-
erly from St. Joseph. (See U. S. Lake Survey Chart No. 76.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 2, 1867, and modified by the River and
Harbor Acts of June 14, 1880, August 2, 1882, and August 11, 1888.
The cost and expenditures prior to commencement of work under the
existing project in 1911 were $318,472.25, of which $187,232.83 was:
for new work and $131,239.42 was for maintenance.       (For further
details see p. 1947 of Annual Report for 1915.)
   Existing project.-This provides for protecting the mouth of Black
River by two piers and revetments, 190 to 166 feet apart, with
lengths of 2,143 feet and 2,182 feet for the north and south sides,
respectively; for an entrance channel 21 feet deep and 130 feet wide
to the shore line; thence a channel 19 feet deep and 130 feet wide,
extending up the river to a turning basin 375 feet wide and 19
feet deep, located immediately below the Dyckman Avenue Bridge.
The length of entrance channel to the inner end of the piers is about
2,700 feet arid in the river to the bridge 2,400 feet.
   The piers and revetments are formed of timber cribs and piling.
The piers and revetments are capped with concrete except for the
outer 400 feet on both piers and 1,160 feet at inner ends of the
revetments.
   The project depths are referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York.
   The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost of new work revised in 1935 is $220,000,
exclusive of the amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $17,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 11, 1888, provided for the channel
from the inner end of the piers to the highway bridge; act of March
3, 1905, provided for the present dimensions of the piers and for the
turning basin (H. Doc. No. 119, 58th Cong., 2d sess.); and the act of
August 30, 1935, provided for the present channel and turning basin
        RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                      1229
dimensions (Rivers and Harbors Committee Doc. No. 9, 73d Cong.,
1st sess., and Report of the Chief of Engineers dated Dec. 21, 1934).
   The latest published map is in the last-mentioned document.
   Local cooperation.-The act of August 30, 1935, provided "that
no expense shall be incurred by the United States for the acquiring
of any lands required for the purpose of this improvement." Ac-
cording to latest information no land will be required as enlarge-
ment of the basin is not desired by local interests. All prior require-
ments have been complied with.
   Terminal facilities.-These consist of several wharves used for
handling coal, building materials, wood pulp, fish and miscellaneous
commodities. The city has constructed a municipal wharf and ware-
house. The municipal wharf is leased to a private corporation which
operates it in the interest of general commerce on like terms for like
service. The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Operatiollnsconsisted of
dredging 49,118 cubic yards, by hired labor and use of Government
plant, for restoration of 19- and 17-foot depths at a total cost of
$9,688.32 for maintenance.        The total net expenditures were
$8,983.41.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 30, 1935, was completed in 1913, at a saving
of $117,351 under the estimated cost. The dredging under the old
project was completed in 1912 and the extensions to the piers in 1913.
No work has been done on the last modification of the project pro-
viding for widening and deepening the channel to 21- and 19-foot
depths. Enlargement of the turning basin is not considered necessary
under present conditions and is no longer desired by local interests.
The remaining timber superstructures are in general in poor condi-
tion. The controlling depths below low-water datum at the close
of the fiscal year were 18 feet in the channel between the piers and
17 feet in the river. The costs under the existing project are $162,-
018.74 for new work and $413,337.93 for maintenance, a total of
$575,356.67. The total expenditures are $574,512.85.
   Proposed operations.-The balance unexpended, together with al-
lotments of $44,000 made during July 1937, will be applied as
follows :
Accounts payable June 30, 1937-------------------------------        $1, 163. 98
New work: Deepening entrance channel to project depth by con-
  tract, summer and fall of 1938_------------------------------- 25, 000. 00
Maintenance :
     Operation of U. S. hopper dredge Meade, May 1938__ $15, 183. 89
     Repair in concrete 200 feet of superstructure on
       outer end of north pier, where damaged by ice and
       sea, August 1937--------------------------------   5, 000. 00
                                                                     20, 183. 89

           Total------------------------ ------------------------     46, 347. 87
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $14,000 can be profitably
expended during the fiscal year ending June 30, 1939, in mainte-
nance operation of U. S. hopper dredge Meade during the spring
of 1939.
1230              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                         Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                                  $349, 251.57
Cost of maintenance to June 30, 1937 -- -------------------                                                      544, 577. 35
       Total cost of permanent work to June 30, 1937-------------                                                 893, 828. 92
Undistributed costs June 30, 1937------------------------------                                                       320. 16
     Net total cost to June 30, 1937----------------------------894, 149. 08
Minus accounts payable June 30, 1937-........                      1, 163.98
      Net total expenditures---------------------------------                                                     892, 985. 10
Unexpended balance June 30, 1937------------------------------                                                      2, 347. 87
          Total amount appropriated to June 30, 1.937-----------------895, 332. 97

          Fiscal year ending June 30                    1933                    1934       1935           1936             19,37

Cost of new work__
Cost of maintenance._            -__                 $12, 956. 92        $18, 585. 86    $7, 090. 39   $14, 104. 25      $9, 688. 32
Total expended....._                                  12, 875. 19          18, 672. 91    7, 072. 35    13, 995. 38       8, 983. 41

Allotted_-----_        -----------------------        10, 850. 00          28, 521. 33   11, 500. 00    14, 000. 00      -4, 500. 00


Balance unexpended July 1, 1936________                                                                           $15, 831. 28
Deductions on account of revocation of allotment                                                                    4, 500. 00
      Net amount to be accounted for__                                                                                11, 331. 28
Gross amount expended------                                                                                            8, 983. 41
      Balance unexpended June 30, 1937__                                                                               2, 347. 87
Outstanding liabilities June 30, 1937                                                                                  1, 166. 40
     Balance available June 30, 1937                                                                                   1, 181. 47
Amount allotted from War Department Civil Appropriation Act
                       ---------------------------------------
approved July 19, 1937___                                                                                            44, 000. 00
    Balance available for fiscal year 1938                             45, 181. 47
                                                           _-------------------_
Amount (estimated) required to be appropriated for completion of
  existing        project 1--_         ___________             --------------                                         32, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939 for maintenance 1                     ___              _____---------------_                               14, 000. 00
  1Exclusive or available funds.

          20. SAUGATUCK HARBOR AND KALAMAZOO RIVER, MICH.

   Location.--Located on the east shore of Lake Michigan, distant
about 90 miles northeasterly from Chicago and about 22 miles north-
erly from South Haven. (See U. S. Lake Survey Chart No. 76.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of July 25, 1868, and modified by the River and
Harbor Act of July 11, 1870. The cost and expenditures prior to
the commencement of work under the existing project in 1904 were
$207,785.92, of which $90,231.99 was for new work and $117,553.93
for maintenance.    For further details, see page 1947 of Annual
Report for 1915.
  Existing project.-This provides for an entrance channel between
parallel piers, 200 feet apart, having lengths of 2,778 and 2,514 feet
for the north and south piers, respectively, and for a channel 16
feet deep and 100 feet wide, extending from that depth in Lake
Michigan to the mouth of the river, thence 14 feet deep, 90 feet
       RIVERS AND HARBORS-MILWAUKEE,           WIS., DISTRICT     1231
wide in the Kalamazoo River up to Saugatuck, a distance of 9,000
feet. The piers are formed of timber cribs and piling, 700 feet of
the north pier and 800 feet of the south pier have been provided
with concrete superstructure.
   The project depths are referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of about
112 feet above or below the mean lake level prevailing at the time.
    The estimate of cost for new work, revised in 1910, was $286,000,
exclusive of the amount expended on previous projects. The latest
(1928) approved estimate for annual cost of maintenance is $9,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 3, 1896, provided for the entrance channel
 (H. Doc. No. 192, 54th Cong., 1st sess.) ; act of March 2, 1907, pro-
vided for deepening the entrance to 16 feet; and the act of June
25, 1910, provided for the depth of 14 feet in the river (H. Doc. No.
635, 61st Cong., 2d sess.). The latest published map is in House
Document No. 608, Sixty-fourth Congress, first session.
   Recommended modifications of project.-Legislation authorizing
the abandonment of the project has been recommended in House
Document No. 292, Sixty-fifth Congress, first session.
   Terminal facilities.-At the village of Saugatuck there are several
landing places for small vessels and one for commercial vessels.
At the village of Douglas there is a landing pier. The terminal
facilities are available for general use and are considered adequate
for existing commerce.
   Operations and results during fiscal year.-Operationsconsisted of
dredging 40,504 cubic yards for restoration of project depth at a
cost of $8,751.09. Repairing substructure and rebuilding superstruc-
ture, in concrete, on the outer 800 linear feet of the north and south
piers, in progress at the close of the previous fiscal year, was com-
pleted, with the exception of a small amount of stone filling, at a
cost of $69,810.58. Repairing substructure and rebuilding super-
structure, in concrete, on 1,702 linear feet of the north revetment, in
progress at the close of the fiscal year, cost $19,618.48. All work
t as done by hired labor and use of Government plant. The total
cost was $98,180.15 for maintenance. The total net expenditures were
$104,308.11.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1911 at a saving of $11,705 under the estimated cost. Pier
construction and dredging between the piers was completed in 1908;
dredging in the river was completed in 1911.    The superstructure on
the outer 100 feet of the north pier and on 1,702 feet of the north
revetment is being rebuilt in concrete. The remaining timber super-
structure on the south pier and revetment requires rebuilding. The
controlling depth below low water datum at the close of the fiscal
year was 14 feet in the channel between the piers and in the river
to Saugatuck. The costs under the existing project are $274,294.80
for new work and $284,606.92 for maintenance, a total of $558,901.72.
The total expenditures are $558,099.56.

     20 96-37-pt. 1--78
1232         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Proposed operations.--The balance unexpended, together with an
allotment of $69,000, made during July, will be applied as follows:
Accounts payable June 30, 1937-             -__             -_______________
                                                                          __-______                        $7, 743. 95
Maintenance:
   Operation of U. S. bucket dredge Tompkins, April-May 1938_ __    9, 500. 00
   Complete reinforcing substructure and rebuilding superstructure
      on 1,700 linear feet of north pier and revetment, including
      stone filling, with United States plant, July-October 1937_  0_ 297.33
                                                                   67,
           Total _____________________________                                                             84, 541. 28
   Dredging is required annually for maintenance of project dimen-
sions of channel. The old timber superstructure on the remainder
of the south pier and revetment requires rebuilding in concrete. The
additional sum of $102,000 can be profitably expended during the
fiscal year ending June 30, 1939, as follows:
Maintenance:
   Operation of U. S. bucket dredge Tompkins, spring of 1939 ___.._                                               $9, 250
   Reinforce substructure and rebuild superstructure on 1,750 linear
      feet of south pier and revetment at $53 with United States plant,
      summer and fall of 1938-------------------------------------_                                               92, 750
           Total_ --     -                         ------                                                     102, 000

                                 Cost and financial summary

Cost of new work to June 30, 1937---------------------------- $364, 526. 79
Cost of maintenance to June 30, 1937---------------------------- 402, 160. 85
        Total cost of permanent work to June 30, 1937___________                                       766, 687. 64
Undistributed costs June 30, 1937_--_--------______--____                                                   6, 941. 79

      Net total cost to June 30, 1937                                                                  773, 629.
Plus accounts receivable June 30, 1937_______________                                   -     ___  -----------43
     Gross total costs to June 30, 1937--------------------------                                      773, 629. 43
Minus accounts payable June 30, 1937_______________________ ___                                          7, 743. 95

     Net total expenditures--_-------_-------- ----------                                              765, 885. 48
Unexpended balance June 30, 1937__----_______--15,                                                          541.28
        Total amount appropriated to June 30, 1937                                                     7____________--781,
                                                                                                           426. 76

        Fiscal year ending June 30             1933           1934               1935          1936               1937


Cost ofnew work
Cost of maintenance
                        ------------------ ------------
                                 _--        $11, 563. 80
                                                             ------
                                                               $5, 000
                                                                          ------     ---
                                                                             $1, 437. 45
                                                                                            -------    --
                                                                                            $31, 443. 28
                                                                                                              -
                                                                                                              $98, 180. 15
Total expended-_--------------------         11, 563. 80         5, 000            80. 34    25, 870. 27      104, 308. 11
Allotted---------------------------         -4, 312. 24          5, 000       7, 500. 00    144, 300. 00      -6, 000. 00

Balance unexpended July 1, 1936__________________________                                             $125, 849. 39
Deduction on account of revocation of allotment--                                _________               6, 000. 00

      Net amount to be accounted for _.._____________________                                         119, 849. 39
Gross amount expended_____---------------------     $105, 976. 38
Less reimbursements collected ___________----------1, 668. 27
                                                                                                       104, 308. 11

      Balance unexpended June 30, 1937-------------------------                                            15, 541. 28
Outstanding liabilities June 30, 1937----------_____     -    _                                            11, 4120. 85

       Balance available June 30, 1937----                                   _              ____            4.--,_-120. 43
        RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                     1233
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------       $69, 000.00

     Balance available for fiscal year 1938_---------------------    73, 120. 43
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1       __      _-----
                                         --------                   102, 000.00
  1 Exclusive of available funds.

                         21. HOLLAND HARBOR, MICH.

  Location.-Located on the east shore of Lake Michigan, distant
about 95 miles northeasterly from Chicago and about 23 miles south-
erly from Grand Haven. (See U. S. Lake Survey Chart No. 763.)
  Previous project.-The original project was adopted by the River
and Harbor Act of August 30, 1852, and modified by the River
and Harbor Acts of June 23, 1866; March 3, 1873; March 3, 1879;
July 5, 1884; and July 13, 1892. The cost and expenditures prior
to the commencement of work under the existing project in 1899
were $304,217.30, $176,619.80 for new work and $127,597.50 for main-
tenance. For further details see page 1948 of Annual Report for 1915.
  Existing project.-This provides for protecting the outlet of the
channel from Lake Macatawa (formerly Black Lake) by two con-
verging piers having lengths of 753 and 801 feet for the north and
south piers, respectively, and with widths between them of 300 feet
at the outer end and 740 feet at the inner end; for inner piers and
revetments along the channel from Lake Macatawa about 180 feet
apart, with lengths of 1,755 and 1,639 feet for the north and south
piers, respectively; and for dredging a channel 2'3 feet deep from that
depth in Lake Michigan to a point 400 feet inside the entrance be-
tween the outer piers, thence decreasing to 21 feet at the outer end of
the inner piers, thence 21 feet between the inner piers and through
Lake Macatawa to the turning basin at Holland; and for widening
the turning basin to 600 feet, 21 feet deep within the channel limits
and 18 feet deep outside the channel limits, the width of channel
being 300 feet through the outer harbor, thence reducing from 140
feet to 110 feet between the inner piers and revetments, thence in-
creasing to 150 feet in the channel in Lake Macatawa to the turning
basin, the length of the dredged channel, including that in the west-
erly end of Lake Macatawa, being about 1 mile, and that in the east-
erly end of Lake Macatawa, including the turning basin, being about
3 miles, the total distance from the outer end of the channel to the
wharves at Holland being 5.5 miles. The piers and revetments are
built of timber cribs and piling, all of which are capped with con-
crete superstructure.
   The project depths are referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of about
1 /2 feet above or below the mean lake level prevailing at the time.
   The estimate of cost of new work, revised in 1935, is $480,000,
exclusive of amount expended on previous project. The latest (1935)
approved estimate for annual cost of maintenance is $16,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 30, 1852, provided for an artificial
1234      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

channel between Lake Macatawa and Lake Michigan; act of March
2, 1867, provided for piers and revetments to protect the channel
 (Annual Report for 1866, pp. 106-109) ; act of March 3, 1899, pro-
vided for extending the inner piers (H. Doc. No. 272, 54th Cong.,
2d sess.); act of March 3, 1905, provided for the converging piers
 (Annual Report for 1905, p. 2176); act of July 3, 1930, provided for
the channel to Holland and the turning basin (H. Doc. No. 588, 69th
Cong., 2d sess.); and the act of August 30, 1935, provided for the
present channel and turning basin dimensions (Rivers and Harbors
Committee Doc. No. 48, 74th Cong., 1st sess.). The latest published
map is in the last-mentioned document.
   Terminal facilities.-The wharves are located at the city of Hol-
land, at the inner end of Lake Macatawa, and are used for handling
coal, building materials, petroleum products, and miscellaneous com-
modities. The city of Holland has provided a public wharf for small
craft. These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted
of dredging 86,454 cubic yards for restoration of 20- and 18-foot
depths in the entrance channel and channel in Lake Macatawa at a
cost of $12,700.04. Placing 5,305 tons of stone to raise and repair
rubble mound connections between the outer and inner piers cost
$19,565.38. All work was done by hired labor and use of Govern-
ment plant. The total cost was $32,265.42 for maintenance. The
total net expenditures were $34,054.68.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 30, 1935, is completed. The pier construction
was completed in 1910. Dredging to deepen the entrance channel
and to provide the inner channel in Lake Macatawa under the old proj-
ect was completed in 1933 and 1932, respectively. No work has been
done on the last modification of the project providing for deepening
the outer and inner channels to 23- and 21-foot depths and enlarging
the turning basin. The piers and revetments are in good condition.
The controlling depths at low-water datum at the close of the fiscal
year were 19.3 feet in the basin between the converging piers, 18.4 feet
in the channel between the inner piers to Lake Macatawa and 18 feet
in the inner channel in Lake Macatawa to the wharves at Holland.
The costs under the existing project are $353,222.20 for new work
and $570,418.77 for maintenance, a total of $923,640.97. The total
expenditures are $921,988.66.
   Proposed operations.-The balance unexpended, together with al-
lotments of $156,500 made during July will be applied as follows:
Accounts payable June 30, 1937-__                                     $1. 835. 67
New workD: Deepening outer and inner channels and enlarging
    turning basin to project dimensions by contract, July
    to June 1939                                     _  ___
                                                          _
                                                             1938,   125, 000. 00
Maintenance:
    Operation of U. S. hopper dredge Meade, Novem-
      ber 1937, and May 1938------------------------   $19, 348.84
    Large stone for raising south stone mound connec-
      tion between outer and inner piers, with United
      States plant, 3000 tons at $4.50, August-Septem-
      ber 1937 -------------------------------------- 13, 500.00
                                                                      32, 848. 84

       Grand total__   -    -     - ________--
                                         --                 --- -_____159, 684. 51
            RIVERS AND HARBORS-MILWAUKEE,                                       WIS., DISTRICT                            1235
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $15,000 can be profitably
expended during the fiscal year ending June 30, 1939, in mainte-
nance operation of U. S. hopper dredge Meade during the spring
of 1939.
                                          Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                                  .$529,   842. 00
Cost of maintenance to June 30, 1937------------------------                                                        698, 016. 27

      Total cost of permanent work to June 30, 1937 --------  1, 227, 858. 27
Undistributed costs June 30, 1937-___      ____------------------183.36

     Net total cost to June 30, 1937_-----------------------                                                   1, 228,041. 63
Minus accounts payable June 30, 1937                                                                                1, 835. 67

     Net total expenditures---------------------------------                                                  1, 226, 205. 96
Unexpended balance June 30, 1937______-- ___-  ------------------                                                   3, 184.51

         Total amount appropriated to June 30, 1937-----_---------                                             1, 229,390.47

         Fiscal year ending June 30                 1933           1934           1935                  1936              1937


Cost of new work__---                            $38, 214. 21                                                ----
Cost of maintenance ....          -               79, 085. 36   $40,869. 83    $13, 089. 56     $15, 671. 85           $32, 265. 42

       Total cost_                               117, 299. 57    40, 869. 83    13, 089. 56      15, 671. 85             32, 265. 42
Total expended ....                              121, 342. 47    43, 252. 13    12, 722. 08      12, 590. 82             34, 054. 68

Allotted __.--------       ------------           84, 260. 93    23, 000. 00    18,000. 00       26, 500. 00             6,100. 00


Balance unexpended July 1, 1936_----------------                                                    -               $31, 139. 19
Amount allotted from                  War Department              Appropriation               Act        ap-
   proved May 15, 1936                       -        ___
                                                       -____         _                   --             --            6, 100.00

      Amount to be accounted for _______-----                                            --                          37, 239. 19
Gross amount expended -   _ ___--
                              __-_____
                                     --                                   _                                          34, 054. 68

         Balance unexpended June 30, 1937                                 --        -----                             3, 184. 51
Outstanding liabilities June 30, 1937--------------------                                                             1, 835. 67

         Balance available June 30, 1937----------                                                                    1, 348. 84
Amount allotted from War Department Civil Appropriation                                                 Act
   approved July 19, 1937 __1____________________
                             --                                                                                     156, 500. 00
     Balance available for fiscal year 1938_--- _  ___ ---     - -157, 848. 84
Amount that can be profitably expended in fiscal year ending June
30, 1939: for maintenance -      -______________-     ___________ 15, 000. 00
   1 Exclusive of available funds.

            22. GRAND HAVEN HARBOR AND GRAND RIVER, MICH.

  Location.-The harbor is located on the east shore of Lake Mich-
igan distant about 108 miles northeasterly from Chicago and about
23 miles northerly from Holland. The river rises in Jackson County,
Mich., and flows in a general westerly direction into Lake Michigan,
with a total length of about 260 miles. (See U. S. Lake Survey
Chart No. 765, and U. S. Geological Survey Grand Rapids quad-
rangle.)
    Previous projects.-The original project for the river was adopted
by the River and Harbor Act of March 3, 1881.                                            A new project was
adopted by the River and Harbor Act of June 3, 1896, and was
modified by the River and Harbor Act of June 13, 1902. The cost
1236    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and expenditures prior to the commencement of work under the exist-
ing project in 1905 were $324, 756. 60, of which $311,329.15 was for
new work and $13,427.45 for maintenance. For further details see
page 1949 of Annual Report for 1915.
   Existing project.-This provides for protecting the mouth of the
river by piers and revetments, 415 feet apart at the entrance, dimin-
ishing to 390 feet inside, about 3,569 and 5,549 feet in length for
the north and south sides, respectively, and for a channel 23 feet
deep and generally 300 feet wide and 1,500 feet long from that depth
in the lake to a point about 1,000 feet inside the pier ends; thence 21
feet deep and 300 feet wide and 114 miles long to the car-ferry slip,
with an enlargement at the upper end; thence 21 feet deep and 200
feet wide and 11/4 miles long from the car-ferry slip to the Grand
Trunk Railway bridge at Ferrysburg; thence a channel 18 feet deep
and generally 100 feet wide to deep water in Spring Lake, a distance
of about 1,350 feet in the river and about 1,750 feet up the outlet
from Spring Lake; and for a channel in Grand River 8 feet deep at
low water datum, 100 feet wide and 141/2 miles long to Bass River,
the total length of river channel being about 171/2 miles. The piers
and revetments are built of timber cribs and piling, 2,893 feet of
the north side and 4,928 feet of the south side having been capped
with concrete superstructure.
   The estimate of cost of new work, revised in 1937, is $760,000,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $35,000.
   The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide at New York.
The fluctuations of water level in the harbor are seasonal changes
of about one-half foot above or below the annual mean stage, and
extreme fluctuations of a temporary nature, due to wind and baro-
metric pressure, of about 1 feet above or below the mean lake level
prevailing at the time.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1866, as amended by the acts of
June 14, 1880, September 19, 1890, and July 13, 1892, provided for
the piers and revetments; act of June 3, 1896, provided for a
channel 100 feet wide in the river from Grand Rapids to Grand
Haven (H. Doc. No. 197, 52d Cong., 1st sess.); act of June 13,
1902, extended the channel in the river one-half mile upstream to
Fulton Street, Grand Rapids (Annual Report for 1903, p. 510);
act of March 3, 1905, provided for a depth of 6 feet in the river
channel (H. Doc. No. 216, 58th Cong., 2d sess.); act of July 3,
1930, consolidated the projects for the harbor and river and author-
ized the present dimensions of the river channel, eliminating all
that portion of Grand River above Bass River (S. Doc. No. 88,
71st Cong., 2d sess.); and act of August 26, 1937, provided for
the channel to Spring Lake (Rivers and Harbors Committee Doc.
No. 1, 75th Cong., 1st sess.). For latest published maps see Senate
Document No. 88. Seventy-first Congress, second session, and Rivers
and Harbors Committee Document No. 1, Seventy-fifth Congress,
first session.
   Terminal facilities.-Besides a car-ferry slip, there are several
wharves used for handling coal, building materials, fish, and miscel-
laneous commodities. The car-ferry slip is not in use at present.
        RIVERS AND HARBORS-MILWVAUKEE,                  WIS., DISTRICT     1237
The facilities are considered adequate for existing commerce, except
that there should be a public wharf in Grand Haven for transfer
between rail and water.
   Operations and results during fiscal year.-Operations consisted
of dredging 24,205 cubic yards, to provide project width and depth
of 21 feet over most of the channel below the car-ferry slip at a
cost of $4,785.39. Dredging 40,848 cubic yards for restoration of
project depth, below the Grand Trunk Railway bridge, cost $8,-
791.47. Dredging 187,041 cubic yards for restoration of project
depth in the river above the Grand Trunk Railway bridge, cost
$18,083.39. Reinforcing substructure and building concrete super-
structure on 600 linear feet of the south revetment, in progress, at
the close of the previous fiscal year, was completed at a cost of
$5,090.69. All work was done by'hired labor and use of Govern-
ment plant. The total cost was $36,750.94, of which $4,785 39 was
for new work and $31,965.55 for maintenance.          The total net
expenditures were $43,851.61.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 26, 1937, is about 98 percent completed. The
work remaining to be done is a small amount of dredging on the
northerly side of the inner channel at the point of land 1,350 feet
upstream from the inner end of the north revetment. This dredg-
ing cannot be done without revetting the bank or endangering pri-
vate cottages. The present channel past this site, having a least
width of 240 feet, is considered adequate for present and reason-
ably prospective commerce. The piers and revetments were com-
pleted in 1893. Dredging of that portion of the channel between
the car-ferry slip and the Grand Trunk Railway bridge was com-
pleted in 1930 with advanced funds. Dredging of the river above
the railway bridge to Bass River was completed in 1931. No work
has been done on the last modification of the project providing for
dredging the channel into Spring Lake. Portions of the revetments
still require repairs and stone filling. The controlling depths at
low-water datum at the close of the fiscal year were 21.2 feet be-
tween the piers and in the river for a distance of 3,600 feet, thence
20.3 feet to the Grand Trunk car-ferry slip, thence 18.2 feet to the
Grand Trunk Railway bridge, and thence 8 feet to Bass River and
11.7 feet in the outlet from Spring Lake. The costs under the
existing project are $728,704.78 for new work and $1,468,416.20 for
maintenance, a total of $2,197,120.98. The total expenditures are
$2,188,114.06.
   Proposed operations.-The balance unexpended, together with an
allotment of $67,000 for maintenance on July 20, 1937, will be ap-
plied as follows:
Accounts payable June 30, 1937___-------------------------------     $10, 428.60
Maintenance:
    Operation of U. S. hopper dredge Meade, about November 1937,
      and June 1938------------------------------              ---    20, 500.00
    Operation of U. S. bucket dredge Tompkins, July-November
      1937, and May-June 1938 --------------------------------         7, 003. 42
    Complete reinforcing substructure and rebuilding superstruc-
      ture on 564 linear feet of south revetment, including stone
      filling, with United States plant, fall of 1937 _------  -   - 35, 500. 00
        Total   -------------------         -      --                  83, 432. 02
1238           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The channel into Spring Lake should be provided as soon as funds
are made available. Dredging is required annually for mainte-
nance of project dimensions of channel. An additional 676 linear
feet of the north revetment requires repairs. The additional sum
of $102,500 can be profitably expended during the fiscal year end-
ing June 30, 1939, as follows:
New work: Dredging entrance channel 18 feet deep and generally 100
feet wide from the head of the 21-foot project in Grand River into
Spring Lake, by contract, summer and fall of 1938---------------- $25, 500
Maintenance:
   Operation of U. S. hopper dredge Meade, fall of 1938, and
          and spring of 1939_____                            _____-__-___-___________                                 $20, 000
       Operation of U. S. bucket dredge Tompkins summer and
        fall of 1938, and spring of 1939_____________________                                                          16, 440
       Reinforce substructure and rebuild superstructure on 676
         linear feet of north revetment, including stone filling
        at $60, with United States plant, fall of 1938- ------                                                         40, 560
                                                                                                                                    77, 000
               Total---------------------------------------------------102,                                                             500
                                           Cost and financial summary

Cost of new work to June 30, 1937 ......-                   $1, 040, 033.93
Cost of maintenance to June 30, 1937------------------------1, 481, 843. 65

     Total cost of permanent work to June 30, 1937                                               -----------             2, 521, 877. 58
Undistributed costs June 30, 1937___                                                                                           1, 421. 68

     Net total cost to June 30, 1937------------------  --                                                               2, 523, 299. 26
Minus accounts payable June 30, 1937-------------------                                                                      10, 428. 60

     Net total expenditures --------------------------------- 2, 512, 870. 66
Unexpended balance June 30, 1937----------------------------      16, 432. 02

          Total amount appropriated to June 30, 1937-                                                         -          2, 529, 302. 68

          Fiscal year ending June 30                           1933             1934                   1935           1936          1937


Cost of new work.....------------------                                                                                            $4, 785. 39
Cost of maintenance------------------ $56, 806. 95                           $47, 467. 71       $58, 604. 17    $67, 740. 41       31, 965. 55
       Total cost...               ......----------------------56, 806. 95    47, 467. 71        58, 604. 17      67, 740. 41      36, 750. 94

Total expended--.....---.....-----------------59, 976.28                      52, 896. 66        57, 487.29       51, 712. 52      43, 851. 61
Allotted..-..--------       ------------------              43, 727. 86      103, 400.00         70, 000. 00      47, 000. 00     -5, 500. 00


Balance unexpended July 1, 1936                                                             --------                         $65, 783. 63
Deductions on account of revocation of allotment------------------                                                               5, 500. 00
      Net amount to be accounted for-------------------------                                                                   60, 283. 63
Gross amount expended------------------------------ $43, 878. 29
Less reimbursements collected-------------------------        26. 68
                                                                                                                                43, 851. 61

          Balance unexpended June 30, 1937_                                     ---------------------                           16, 432. 02
Outstanding liabilities June 30, 1937---                                                               ---        -             11, 168. 60

     Balance available June 30, 1937---------------------                                                                        5, 263. 42
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937_                                                                                                          67, 000. 00

          Balance available for fiscal year 1938_                                   _____                     _____ _           72, 263. 42
         RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                1239
Amount (estimated)               required to be appropriated for completion of
  existing     project 1 ----------------------                   -----       - ------         $30, 500. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939 :       -  -                            -
    For new work 1                      ___________--_                    _-----------------    25, 500. 00
    For maintenance 1_--------------------------------                                          77, 000. 00

      Total_   1____             _________--------------------1                                02, 500. 00
  1 Exclusive of available funds.

                                 23. MUSKEGON HARBOR, MICH.

   Location.-This harbor is on the east shore of Lake Michigan, dis-
tant about 114 miles northeasterly from Chicago and about 80 miles
easterly from Milwaukee. (See U. S. Lake Survey Chart No. 767.)
   Previous projects.--Adopted by the River and Harbor Act of
March 2, 1867, and modified by the River and Harbor Acts of June
10, 1872, June 23, 1874, August 2, 1882, September 19, 1890, August 18,
1894, March 3, 1899, and June 13, 1902. The cost and expenditures
prior to the commencement of work under the existing project were
$1,059,590.91, of which $613,407.96 was for new work and $446,182.95
for maintenance. For further details see page 1950 of Annual Report
for 1915, and page 1399, Annual Report for 1924.
   Existing project.-This provides for an exterior basin in Lake
Michigan, formed by two arrowhead breakwaters, the south 1,514 feet
and the north 1,404 feet long, 500 feet apart at the outer ends, diverg-
ing at an angle of about 90 ° , the inner ends connected with the
shore by suitable structures 1,660 feet and 1,561 feet long on tlg
north and south sides, respectively; for the removal of 1,003 feet of
the existing north pier and 1,106 feet of the existing south pier; for
repairing and maintaining the revetment around the old car-ferry
slip on the south side of the entrance channel; for dredging a channel
600 feet wide at the entrance, decreasing toward the new pierheads
to 500 feet wide and 240 feet wide between the piers with depths
varying from 24 feet at the harbor entrance to 21 feet at the shore
line and in the inner channel to Muskegon Lake, about 6,050 feet from
the harbor entrance. The south breakwater and shore connection are
built of concrete caissons and piling capped with concrete; the north
breakwater is a rubble mound; the inner piers and revetments are
built of timber cribs and piling, all having been capped with concrete,
except 268 feet of the south revetment which has been repaired with
rubble superstructure and 700 feet around the old car-ferry slip.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctu-
ations of water level are seasonal changes of about one-half foot
above or below the annual mean stage, and extreme fluctuations of a
temporary nature, due to wind and barometric pressure, of about
112 feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1935, is $1,885,000,
exclusive of amounts expended on previous projects. The latest
(1935) approved estimate for annual cost of maintenance is $26,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1925, provided for the breakwaters
and present channel dimensions (H. Doc. No. 494, 67th Cong.. 4th
1240     "REPORT       OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

sess.) ; and the act of August 30, 1935, provided for repairing revet-
ment around the car-ferry slip (Rivers and Harbors Committee Doc.
No. 64, 74th Cong., 1st sess.). The latest published map is in the
last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The main terminals are at the city of Mus-
kegon, at the inner end of Muskegon Lake, and include a car-ferry
slip, a large privately owned wharf equipped with warehouse, transit
shed, and cold-storage plant, and several wharves used for handling
coal, petroleum products, building materials, and miscellaneous com-
modities. There is also a sand wharf at the west end of Muskegon
Lake south of the inner end of the improved channel. These facili-
ties are considered adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted
of dredging 30,209 cubic yards, by hired labor and use of Govern-
ment plant, for restoration of project depth at a total cost of $3,858.58
for maintenance. The total net expenditures were $7,609.63.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 30, 1935, was completed in 1932 at a saving
of $283,908 under the estimated cost. The south breakwater and
south-shore connection was completed in 1930. The north break-
water and shore connection and removal of old piers was completed
in 1931. Deepening and widening entrance channel was completed
in 1932. No work has been done on the last modification of the
project providing for repairing the south revetment around the old
car-ferry slip. The breakwaters and shore connections are in good
%pndition. Except for that portion around the old car-ferry slip,
the inner piers and revetments are in fair condition.
   The controlling depths at low-water datum at the close of the fiscal
year were 21.9 feet in the channel through the outer harbor and 20.2
feet between the inner piers to Muskegon Lake. The costs under the
existing project are $1,856,192.44 for new work and $340,507.91 for
maintenance, a total of $2,196,700.35. The total expenditures are
$2,200,179.15.
   Proposed toperations.-The balance unexpended, together with
allotments of $52,000 made during July will be applied as follows:
Accounts payable June 30, 1937-------------------------------              _     --     $30. 10
New work: Reinforce substructure and rebuild superstructure on 700
  linear feet of south revetment around old car-ferry slip at $40
  by hired labor, summer and fall of 1938_----------------------- 28, 000. 00
Maintenance:
     Operation by U. S. hopper dredge Meade, July and
       October, 1937, and June 1938_-------------------- $20,477. 24
     Riprap and repair breakwaters and revetments with
       United States plant, 4,000 tons, at $3.30, October
       1937                __-------------------------------------------3, 200. 00
                                                                                    33, 677. 24
       Total -------------------------------------------------- 61, 707. 34
   Dredging is required annually for maintenance of project dimen-
sions of channel. Additional riprap and stone filling is required
for the breakwaters and revetments. The additional sum of $20,500
can be profitably expended during the fiscal year ending June 30,
1939, as follows:
              RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                                   1241
Maintenance :
    Operation of U. S. hopper dredge Meade, fall of 1938, and spring
      of 1939----------------------------___________________--------------- $13,900
   Riprap and repair breakwaters and revetments, 2,000 tons, at $3.30,
      with United States plant, summer and fall of 1938--------               6, 600

               Total----------------------------------------------------                                                    20, 500

                                    Cost and financial summary
Cost of new work to June 30, 1937                                                                           2, 469, 600. 40
                                                                                                           $--------------------------
Cost of maintenance to June 30, 1937--                                                                          86, 690. 88
                                                                                                               7-------------------------

      Total cost of permanent work to June 30, 1937------------3, 256, 291.26
Undistributed costs June 30, 1937------------------------------     3, 508. 90

      Net total cost to June 30, 1937--------------------------                                              3, 259, 800. 16
Minus accounts payable June 30, 1937                                                                                  30. 10

     Net total expenditures---------------------------------                                                 3, 259, 770. 06
Unexpended balance June 30, 1937_ ----------------------------                                                    9, 707. 34
           Total amount appropriated to June 30, 1937------------ 3, 269, 477. 40

           Fiscal year ending June 30            1933               1934              1935               1936                1937


Cost of new work                               $5, 600. 00
Cost of maintenance           __               84. 784. 99     $94, 969. 43    $94, 324. 69           $12, 129. 46         $3, 858. 58

Total cost_-                                   90, 384. 99       94, 969. 43        94, 324. 69        12, 129. 46          3, 858. 58

      Total expended -. -                     119, 679. 75     100, 891. 62         84, 408. 71        15, 617. 36          7, 609. 63

Allotted         --------------------     --- 1, 000. 00       180, 734. 67         13, 000. 00            500. 00         -8, 000. 00


Balance unexpended July 1, 1936                                                                                  $25, 316.97
Deductions on account of revocation of allotment------------------                                                 8, 000. 00

      Net amount to be accounted for-.                                                                               17, 316. 97
Gross amount expended_---------------------                                                  $7, 837. 60
Less reimbursements collected__---------------------                                             227. 97
                                                                                                                      7, 609. 63

           Balance unexpended June 30, 1937-------------------------                                                  9, 707. 34
Outstanding liabilities.June 30, 1937                   ---------------                                                      30. 10

     Balance available June 30, 1937--------------------                                                              9, 677. 24
Amount allotted from War Department Civil Appropriation Act,
   approved July 19, 1937---              -       --------                              -----------                  52,    000. 00
           Balance available for fiscal year 1938 --
                                                  _                            --                                    61, 677. 24

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1------------20,                                                                                 500. 00
   1 Exclusive of available funds.

                             24. WHITE LAKE HARBOR, MICH.

   Location.-On the east shore of Lake Michigan, about 120 miles
northeasterly from Chicago and about 45 miles southerly from
Ludington. (See U. S. Lake Survey Chart No. 768.)
   Existting project.-This provides for the abandonment of the old
outlet and the creation of a new channel 16 feet deep, 200 feet wide,
and about 1,950 feet long from Lake Michigan to White Lake be-
tween parallel piers and revetments having lengths of 1,717 feet and
1,953 feet on north and south sides, respectively. The piers and
1242     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

revetments are built of timber cribs and piling; the entire north pier
has been capped with concrete superstructure and 150 feet of the
south pier has been paved with concrete. The project depth is re-
ferred to low-water datum for Lake Michigan, which is 578.5 feet
above mean tide at New York. The fluctuations of water level are
seasonal changes of about one-half foot above or below the annual
mean stage and extreme fluctuations of a temporary nature, due to
wind and barometric pressure, of about 1/2 feet above or below the
mean lake level prevailing at the time.
   The estimated cost of new work, revised in 1907, was $353,550.
The latest (1928) approved estimate for annual cost of maintenance
is $5,500.
   The existing project was adopted by the River and Harbor Act of
March 2, 1867, and amended by River and Harbor Acts of March 3,
1873; July 5, 1884; July 13, 1892; and March 2, 1907. These amend-
ments relate principally to the length of the proposed piers and revet-
ments, and the estimated costs, except the last one, which increased
the project depth by dredging. The latest published map is in House
Document No. 2053, Sixty-fourth Congress, second session.
   Terminal facilities.-There is a coal wharf located about three-
fourths of a mile south of the village of Montague, at the inner end
of White Lake; across the lake, at the village of Whitehall, there are
several wharves available for boats of shallow draft. These facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted of
dredging 16,992 cubic yards for restoration of project depth at a cost
of $2,779.93. Repairing substructure and rebuilding superstructure,
in concrete, on 1,717 linear feet of the north pier and revetment, in
progress at the close of the previous fiscal year, was completed, except
for a small amount of backfilling, at a cost of $40,291.45. Repairing
substructure and rebuilding superstructure, in concrete, on 1,953
linear feet of the south pier and revetment, in progress at the close
of the fiscal year, cost $38,632.45. All work was done by hired labor
and use of Government plant. The total cost was $81,703.83 for
maintenance. The total net expenditures were $79,257.32.
   Condition at end of fiscal year. The existing project was completed
in 1908, at a saving of $145,688 under the estimated cost. The piers
and revetments were completed in 1900, and the dredging in 1908.
The north pier and revetment are in good condition. The south pier
and revetment are being repaired and provided with concrete super-
structure. The controlling depth at low-water datum at the close
of the fiscal year was 17 feet in the entrance channel between the piers
to White Lake. The costs under the existing project are $207,862.44
for new work and $422,907.97 for maintenance, a total of $630,770.41.
The total expenditures are $622,457.40.
   Proposed operations.-The balance unexpended, together with an
allotment of $90,000, made during July, will be applied as follows:
Accounts payable June 30, 1937__________________________________          $14, 679. 48
Maintenance:
    Operation of U. S. hopper dredge Meade, June 1938 ---- __   __         10, 000. 00
    Complete reinforcing substructure and rebuilding superstructure
      on 1,950 linear feet of south pier and revetment, including
      stone filling, with United States plant, summer and fall of
     1937                                                                  95, 066. 57
        Total                  -      ---                   -                    746. 05
                                                                     -119.1-..----------
           RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                   1243
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $8,000 can be profitably
expended during the fiscal year ending June 30, 1939, in maintenance
operation of U. S. hopper dredge Meade during spring of 1939.
                                     Cost and financial summary
Cost of new work to June 30 1937____                                                             $207, 862.44
Cost of maintenance to June 30, 1937__                      _____                                 422, 901. 97

      Total cost of permanent work to June 30, 1937                                               6301, 770. 41
Undistributed costs June 30, 1937_____                                                               6, 366. 47
     Net total cost to June 30, 1937____________      ____                                        637, 136. 88
Minus accounts payable June 30, 193.7______________________                                          14, 679. 48

     Net total expenditures ------------------------                                              622, 457. 40
Unexpended balance June 30, 1937          _____      ___                                             29, 746. 05
        Total amount appropriated to June 30, 1937__                                              652, 203.45

        Fiscal year ending June 30            1933           1934          1935           1936           1937

Cost of new work ------------                           -----------         ---- ------- -------
Cost of maintenance___----------------      $9,257.91      $9, 664.21   $12, 328.28 $44, 047.30        $81, 703.83
Total expended------------------------6, 597. 29          11, 399. 17     7,413. 80    43. 787. 15      79, 257. 32
Allotted-----------------------------3, 475. 00           15, 000. 00    15, 500. 00   197, 100.00    -60, 000. 00


Balance unexpended July 1, 1936________ __________-                                              $169, 003. 37
Deductions on account of revocation of allotment ______6__--
                                                        --                              ____        0, 000. 00
        Net amount to be accounted for_________________________                                   109, 003. 37
Gross amount expended____     _____________                                  $80, 455.13
Less reimbursements collected __________________                           _   1, 197. 81
                                                                                                     79, 257. 32
        Balance unexpended June 30, 1937____________---_____                                         29, 746. 05
Outstanding liabilities June 30, 1937__                    ________                ____              21, 668. 76
        Balance available June 30, 1937__________________________                                     8, 077.29
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------                                               90, 000. 00
     Balance available for fiscal year 1938_______________ ____                                      98, 077.29
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1___________________________________                                      8, 000. 00
  1 Exclusive of available funds.
                            25. PENTWATER HARBOR, MICH.
   Location.-On the east shore of Lake Michigan, about 146 miles
northeasterly from Chicago and about 14 miles southerly from Lud-
ington. (See U. S. Lake Survey Chart No. 77.)
   Existing project.-This provides for widening the old entrance
channel to 150 feet between parallel piers and revetments, the chan-
nel to extend from Lake Michigan to Pentwater Lake, with a depth
of 16 feet. The piers and revetments are built of timber cribs and
piling. The project depth is referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half foot
above or below the annual mean stage and extreme fluctuations of a
temporary nature, due to wind and barometric pressure, of about
11/2 feet above or below the mean lake level prevailing at the time.
1244      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimate of cost for new work, revised in 1892, is $327,713.40,
excluding the amendment of 1907. There is no approved estimate of
cost for the last amendment nor for annual maintenance.
   The existing project was adopted by the River and Harbor Act
of March 2, 1867, and amended by River and Harbor Acts of March
3, 1873; July 5, 1884; July 13, 1892; and March 2, 1907. These
amendments relate principally to the length of the proposed piers
and revetments, except the last one, which provided for the present
depth of dredging. The latest published map is in House Document
No. 303, Sixty-sixth Congress, first session.
   Recommended modifications of project.-The project was recom-
mended for abandonment in House Documents Nos. 429, Sixty-fourth
Congress, first session; and 467, Sixty-ninth Congress, first session.
   Terminal facilities.-A number of small, privately owned wharves
are grouped at the west end of Pentwater Lake. These facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted of
dredging 21,808 cubic yards, by hired labor and use of Government
plant, to obtain a depth of 10 feet in the entrance channel between
the piers, at a total cost of $6,516.60 for maintenance. The total net
expenditures were $6,514.32.
   Condition at end of fiscal year.-The existing project is about 55
percent completed. The north pier and revetment was completed in
1.885 for a length of 2,226 feet and the south pier in 1889 for a length
of 1,847 feet. The dredging was completed in 1907. The work re-
maining to be done to complete the existing project is a 200-foot exten-
sion to the south pier which is not considered necessary under present
conditions. The net length of the north pier and revetment is now
2,022 feet, 204 feet having been removed in 1931. The piers and revet-
ments are in poor condition. The controlling depth at low-water
datum at the close of the fiscal year was 9.3 feet in the entrance chan-
nel between the piers to Pentwater Lake. The costs under the exist-
ing project are $179,899.10 for new work and $201,464.58 for mainte-
nance, a total of $381,363.68. The total expenditures are $381,430.53.
   Proposed operations.-The balance unexpended, together with an
allotment of $8,000, and a revocation of $1,300, made during July,
will be applied as follows:
Accounts payable June 30, 1937_                                               $14. 00
Maintenance: Operation of U. S. bucket dredge Tompkins,             July-
August 1937 --      --------------------------------------------           8, 075. 47

       Total__
            ------------------------------------                            8, 089. 47
  Dredging is required annually for maintenance of project di-
mensions of channel. The outer 800 linear feet of the north pier and
the outer 850 linear feet of the south pier and revetment should be
repaired as soon as funds are made available. The additional sum
of $118,500 can be profitably expended during the fiscal year ending
June 30, 1939, as follows:
Maintenance :
   Operation of U. S. bucket dredge Tompkins, summer of 1938-.___ $8, 775
   Reinforce substructure and rebuild superstructure on outer 800
      linear feet of north pier and outer 850 linear feet of south pier
      and revetment, including stone filling, at $66.50 with United
      States plant, summer and fall of 1938____--------_                109, 725
       Total -------------------                                             118, 500
            RIVERS AND HARBORS-MILWAUKEE, WIS., DISTRICT                                                              1245
                                    Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                            $179, 890. 10
Cost of maintenance to June 30, 1937--------- ---                                                          201, 464. 58

      Total cost of permanent work to June 30, 1937------------                                            381, 363. 68
Undistributed costs June 30, 1937-----------------------------                                                   80. 85
      Net total cost to June 30, 1937----------------------------                                          381, 444. 53
Minus accounts payable June 30, 1937---------------------------                                                  14. 00

     Net total expenditures -----------------------------------                                            381, 430. 53
Unexpended balance June 30, 1937                                                                              , 389. 47
                                                                                                             1---------------------------
         Total amount appropriated to June 30, 1937----------------382, 820. 00

         Fiscal year ending June 30                    1933           1934          1935           1936               1937


Cost of new work----                           ----------------                  -----------
Cost of maintenance___ _______________________       _                           $15, 000. 00    $6, 027. 08         $6, 516. 60

Total expended_______________________     ___                                     15, 004. 72     6, 091. 49         6, 514. 32
Allotted_-------_---------                              ------   15, 000 00        7,000. 00      7, 000.00 __


Balance unexpended July 1, 1936   ----------------------       $7, 903. 79
Gross amount expended-----------------------------------------6, 514. 32
      Balance unexpended June 30, 1937_---                                                                      1, 389. 47
Outstanding liabilities June 30, 1937----------                                                                     14. 00
     Balance available June 30, 1937    ___--------------------                                                 1,   375. 47
Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937                                                                                       8, 000. 00

         Balance available for fiscal year 1938_-                                                              19, 375. 47
Amount (estimated) required to be appropriated for completion of
   existing      project     2                  ----                                                       147, 800. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance           2         ---               -          -                             118, 500.00
   1 Includes $1,300 revoked in July 1937.
   2 Exclusive of available funds.


                                 26. LUDINGTON HARBOR, MICH.

  Location.-This harbor is located on the east shore of Lake Michi-
gan, distant about 156 miles northeasterly from Chicago and about
67 miles northerly from Grand Haven.                                         (See U.            S. Lake Survey
Chart No. 774.)
  Previous projects.-The original project was adopted by the River
and Harbor Act of March 2, 1867, and modified by the River and
Harbor Acts of August 5, 1886, August 11, 1888, and March 3, 1899.
The cost and expenditures prior to commencement of work under the
existing project in 1908 were $617,867.30, of which $491,416.22 was
for new work and $126,451.08 for maintenance. For further details
see page 1951 of Annual Report for 1915.
   Existing project.-This provides for an exterior basin in Lake
Michigan, formed by two breakwaters, each with main arm 1,800
feet long, 400 feet apart at the outer ends, diverging at an angle of
90 ° , and with shore connections, 1,103 feet and 2,004 feet in length
for north and south breakwaters, respectively; for the removal of
the outer end of the inner piers; for dredging the exterior basin to a
depth of 18 feet; and for an inner channel about 2,000 feet long
1246    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

connecting Pere Marquette Lake with Lake Michigan, the minimum
navigable width being 150 feet and depth of 18 feet. The break-
waters are built of stone-filled timber cribs and piling. The main
arm of each breakwater and 804 feet of the south shore connection
have been capped with concrete superstructure. Also the entire
north pier and revetment and the entire south pier and revetment
are provided with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of about one-half foot above
or below the annual mean stage, and extreme fluctuation of a tem-
porary nature, due to wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1916, was $1,090,587,
exclusive of amount expended on previous project. The latest (1928)
approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1867, provided for the entrance piers
 (Annual Report for 1867, p. 114) ; act of March 3, 1899, provided for
a channel 18 feet deep below low water (2 feet below mean lake level,
1860-75) between Lake Michigan and Pere Marquette'Lake, for pier
extensions, and reconstruction and repairs to existing structures (H.
Doc. No. 273, 54th Cong., 2d sess.) ; act of March 2, 1907, provided for
the breakwaters, shore connections, and removal of outer ends of the
two inside piers (H. Doc. No. 62, 59th Cong., 1st sess., and Rivers and
Harbors Committee Doc. No. 3, 59th Cong., 2d sess.); act of July
25, 1912, provided for additional riprap and stone filling (Annual
Report for 1912, p. 1044); act of July.27, 1916, provided for dredg-
ing in the basin and for riprap for the breakwaters (Annual Report
for 1916, p. 1401). The latest published map is in the Annual Report
for 1914, page 2974.
   Terminal facilities.--Besides the main terminal of the Pere Mar-
quette Railway Co., consisting of three car-ferry slips and a wharf
with warehouses, there are several wharves used for handling coal,
building materials, and miscellaneous commodities. These facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-Operationsconsisted of
dredging 47,027 cubic yards for restoration of project depth at a cost
of $11,580.08. Placing 958 tons of stone as riprap along the south
revetment cost $2,228.09. Rebuilding the superstructure, in concrete,
on 1,100 feet of the north shore connection and 1,230.5 linear feet of
the south shore connection, by contract, in progress at the close of
the fiscal year, cost $59,746.81. All work, except rebuilding the super-
structures, was done by hired labor and use of Government plant.
The total cost was $73,554.98 for maintenance. The total net expendi-
tures were $52,206.76.,
   Condition at end of fiscal year.-The existing project was completed
in 1918 at a saving of $54,501 under the estimated cost. The break-
waters were completed in 1911, the shore connections in 1914, the
dredging in 1917, and the placing of additional stone as riprap in
1918. The breakwaters and the inner piers and revetments are in
good condition. The superstructures on the shore connections are
being rebuilt in concrete. The controlling depth at low water datum
at the close of the fiscal year was 20 feet in midchannel through the
             RIVERS AND HARBORS-MILWAUKEE,                                          WIS., DISTRICT                       1247
outer harbor and in the channel between the inner piers to Pere
Marquette Lake. The costs under the existing project are $1,036,-
085.93 for new work, and $684,327.41 for maintenance, a total of
$1,720,413.34. The total expenditures are $1,700,171.93.
  Proposed operations.-The balance unexpended, together with an
allotment of $28,000, made during July, will be applied as follows:
Accounts payable June 30, 1937 __-------            _-------------- $20,537.86
Maintenance :
    Operation of U. S. hopper dredge Meade, October 1937--_-----     14, 000. 00                           --
    Complete reinforcing substructure and rebuilding superstruc-
      ture on 1,230 linear feet of south shore connection and on
      1,100 linear feet of north shore connection by contract in
      force, July-October 1937 ---------------------------------- 39, 972. 66
    Riprap breakwaters and revetments with United States plant,
      5,000 tons, at $3.50, September-October 1937, and May-June
      1938___        --------------------------------                17, 500.00

        Total ------------------------------___ -- -2,        010. 52
    Dredging is required annually for maintenance of project dimen-
sions of channel. Additional riprap is required for the breakwaters
and revetments. The additional sum of $21,500 can be profitably
expended during the fiscal year ending June 30, 1939, as follows:
Maintenance :
   Operation of U. S. hopper dredge Meade, fall of 1-938  --     $11, 000
   Riprap breakwaters and revetments, 3,000 tons, at $3.50, with
      United States plant, summer and fall of 1938_               10, 500
             Total --------------------------- --------------------------                                                21, 500
                                         Cost and financial summary
Cost of new work to June 30, 1937_ __-_______                                                              $1, 527, 502. 15
Cost of maintenance to June 30, 1937_                              ___-     -             _                     810, 778.       49
      Total cost of permanent work to June 30, 1937                                                          2, 338, 280. 64
Undistributed costs June 30, 1937 _                                                                                  296. 45
      Net total cost to June 30, 1937-------------------------- 2, 338, 577. 09
Minus accounts payable June 30, 1937-------------------------       20, 537. 86
     Net total expenditures --------------------------------- 2, 318, 039. 23
Unexpended balance June 30, 1937 ..-                              64, 010. 52
          Total amount appropriated to June 30, 1937---                                          -           2, 382, 049. 75

          Fiscal year ending June 30                   1933               1934           1935           1936             1937


Cost of new work-...   .     .     . . ..--
                                  ----------                                       -,                                ._-_     __
Cost of maintenance-- .-........------..----------   $2, 302. 26     $4, 264. 60    $5,296. 82       $14, 334.18     - $73, 554. 98


Total expended __------------------------             1, 800. 60      4, 705. 17        5, 152. 05    14, 608. 65       52, 206. 76
Allotted_.    -----------------------------           5, 900. 00      9, 800. 00        2, 500. 00   154, 400. 00     -33, 500. 00


Balance unexpended July 1, 1936-----------------------------                                                   $149, 717. 28
Deductions on account of revocation of allotment                                    __------           _            33, 500. 00

         Net amount to be accounted for---------------------------                                                  116,217. 28
Gross amount expended--------------------------------------                                                         52, 206. 76

Balance unexpended June 30, 1937--                            ---------------                                       64, 010. 52
     20196-37-pt. 1----79
1248      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937--                     2, 196. 52
                                                           $------------
Amount covered by uncompleted contracts .--.----.          59,675.80
                                                                       $61, 872. 32

     Balance available June 30, 1937___ ____________________-2, 138. 20
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937----------------------------------    28, 000. 00

       Balance available for fiscal year 1938____----   _______-   ___    30, 138. 20

Amount that can be profitably expended in fiscal year ending
                                                          _
                                 --
June 30, 1939, for maintenancel_________________________                 21,500.00
1 Exclusive of vailable funds.

                         27. MANISTEE HARBOR, MICH.

   Location.--On the east shore of Lake Michigan, distant about 179
miles northeasterly from Chicago and about 26 miles northerly from
Ludington. (See U. S. Lake Survey Chart No. 776.)
  Previous projects.--Adopted by the River and Harbor Acts of
March 2, 1867, June 10, 1872, March 3, 1873, March 3, 1875, August 14,
1876, September 19, 1890, July 13, 1892, March 2, 1907, and June 25,
1910. The cost and expenditures prior to the commencement of the
existing project in 1913 were $354,998.68 for new work and $150,909.99
for maintenance, a total of $505,908.67. For further details see page
1952 of Annual Report for 1915.
   Existing project.-This provides for an entrance channel 23 feet
deep, 570 feet wide, 1,600 feet to the outer end of the south pier;
thence 21 feet deep between the piers and in the river, 120 to 220
feet wide, 2,000 feet; and thence with a minimum width of 100 feet
from the inner end of the north revetment to Manistee Lake, about
6,400 feet. The project also provides for a south breakwater having
a main arm 1,300 feet long and a shore connection 1,185 feet long,
north pier and revetment 2,797 feet long, and south pier and revet-
ment 695 feet long. The breakwater, shore connection, and piers
are built of stone-filled timber cribs and piling and are capped with
concrete superstructure.
   The project depths are referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York. The
fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of
about 11/2 feet above or below the mean lake level prevailing at the
time.
   The estimate of cost for new work, revised in 1934, is $500,000,
exclusive of amount expended on previous projects. The latest
(1928) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1867, provided for the entrance
piers (Annual Report for 1867, p. 115) ; act of September 19, 1890,
provided for extending the channel a distance of 8,000 feet to con-
nect with Manistee Lake and for further pier extension (Annual
Report for 1891, p. 2678) ; act of July 25, 1912, provided for a depth
of 20 feet in the outer harbor, 570 feet wide to the outer end of the
south pier and 18 feet deep in the river, construction of the south
breakwater with its shore connection, and extension of the north
pier if required (H. Doc. No. 599, 62d Cong., 2d sess.); and the act
        RIVERS AND HARBORS-MILWAUKEE,                 WIS., DISTRICT          1249
of July 3, 1930, provided for the present project depths of the chan-
nels (S. Doc. No. 131, 71st Cong., 2d sess.). The latest published
map is in the last-mentioned document.
   Local cooperation.-The act of July 3, 1930, provided "that no
work shall be undertaken on the section of the river through and
above the bridges until they have been modified in a manner satisfac-
tory to the Secretary of War." The Smith Street Bridge has been
rebuilt, but the Maple Street Highway Bridge and the railroad
bridge have not been rebuilt. All prior requirements have been
complied with.
   Terminal facilities.-There is a Government wharf and a private
sand wharf on the north side of the river and a package-freight
wharf with warehouse and a coal wharf on the south side. Indus-
tries on Manistee Lake have wharves used for handling coal, salt,
building materials, and pulpwood. The city has provided a wharf
on the south side of the river for general public use. The facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted
of dredging 98,005 cubic yards for restoration of 20- and 18-foot
depths in entrance channel and river, respectively, at a cost of
$25,949.66. Placing 744 tons of stone as riprap along the south
breakwater and north pier cost $1,519.71. Emergency repairs to
piers cost $4,360.90. Borings were taken at a cost of $379.73. All
work was done by hired labor and ued of Government plant. The
total cost was $32,210 for maintenance. The total net expenditures
were $23,642.87.
   Condition at end of fiscal year.-The project in effect prior to the
modification of July 3, 1930, was completed in 1923. The north pier
and revetment, completed in 1893, and the south breakwater and
shore connection in 1920, are in good condition. The dredging of
entrance basin under the old project was completed in 1923. No
work has been done on the last modification of the project providing
for deepening the entrance basin and channel between the piers ani
in the river to Manistee Lake to 23- and 21-foot depths. The con-
trolling depths at low-water datum at the close of the fiscal year
were 21.5 feet in the outer basin, thence 21 feet in the channel be-
tween the piers, and 19.5 feet in the river to Manistee Lake. The
costs under the existing project are $441,243.90 for new work and
$486,512.01 for maintenance, a total of $927,755.91. The total
expenditures are $918,823.34.
   Proposed operations.-The balance unexpended, together with allot-
ments totaling $42,500, made during July, will be applied as follows:
Accounts payable June 30, 1937______________________________             $9, 142.96
Maintenance:
    Operation of U. S. hopper dredge Meade, October 1937 and May
      1938      -------------------------------------------              21, 233. 83
    Driving 13 clumps of round piles along channel faces of north
      and south piers, with United States plant, August 1937____----__   14, 500. 00
    Riprap breakwater, piers, and revetments with United States
      plant, 3,000 tons, at $3.50, July-November 1937-__ -               10, 500. 00
          Total___ ------------------------------------------            55, 376. 79
 1    '51)     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Dredging: is required annually for maintenance of project dimen-
:sians of channel. Additional riprap is required for the breakwater
:and piers. The additional sum of $28,500 can be profitably expended
<during the fiscal year ending June 30, 1939, as follows:
Maintenance :
    Operation of U. S. hopper dredge Meade, fall of 1938, and spring
       of 1939-----------------------------------                  _   $18, 000
    Riprap breakwater and piers, 3,000 tons, at $3.50, with United
      .States plant, summer and fall of 1938--------------------------  10, 500

               Total ----------------------                                 --------------                        28, 500

                                     Cost and financial summary

Cost of new work to June 30, 1937-__-----------------------$796, 242. 58
Cost of maintenance to June 30, 1937 ----------------------   637, 422. 00

      Total cost of permanent work to June 30, 1937-                                      - --           1, 433, 664. 58
Undistributed costs June 30, 1937-----------------210.                                                                39

      Net total cost to June 30, 1937--                                                                  1, 433, 874. 97
Minus accounts payable June 30, 1937----------------------                                                    9, 142. 96

     Net total expenditures-,---------     ------                                    -----            , 424, 732. 01
Unexpended balance June 30, 1937__-._______________                                           -_______ 12, 876. 79
         Total amount aporoDriated to June 30, 1937                                                      1, 437, 608. 80

        Fiscal year ending June 30               1933                1934          1935           1936            1937


                 .---------------
Cost of new work---                    ----
Cost of maintenance------------------$39, 199. 89              $54,494. 20      $47,140. 31    $59, 902. 3      $32, 210. 00
Total expended----------------------------     23,950. 60       71, 294. 64      48, 746.36    58, 039. 93       23, 642.87
Allotted ----------------- -----------------   81, 695. 57      31, 300. 00      86, 500.00    30, 900. 00        2, 500.00


Balance unexpended July 1, 1936_____                                                                         $34,019. 66
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936....-------                                                                                2, 500. 00
      Amount to be accounted for_                                                                            36, 519. 66
Gross amount expended-- --------- __                         -----                   442.87
                                                                               -___$25,
Less reimbursements collected---------                                      ___   1, 800. 00
                                                                                                              23, 642. 87
Balance unexpended June 30, 1937-----_______________________                                                  12, 876. 79
Outstanding liabilities June 30, 1937___________________________                                               9, 218. 54
     Balance available June 30, 1937__________________________                                                3, 658. 25
Amount allotted during July 1937_____________________________                                                42, 500. 00
        Balance available for fiscal year 1938___                                                            46, 158. 25
Amount (estimated) required to be appropriated for completion
of existing project 1_-       -                                                                             70, 000.00
Amount that can be profitably expended in fiscal year ending June
                           1
30, 1939, for maintenance -----           -------                                                           28, 500. 00
  1 Exclusive of available funds.
         RIVERS AND HARBORS--MILWAUKEE,               WIS.,, DISTRICT       1251
28. PORTAGE LAKE HARBOR OF REFUGE, MANISTEE COUNTY, MICH.

    Location.-On the east shore of Lake Michigan, distant about 186
miles northeasterly from Chicago and about 37 miles northerly from
Ludington. (See U. S. Lake Survey Chart No. 777.)
    Existing project.-This provides for a harbor of refuge, with an
entrance channel from Lake Michigan to Portage Lake, 300 feet
wide and 18 feet deep, protected by timber crib and pile piers and
revetments. Concrete paving has been placed on 851 feet of the north
pier and 901 feet of the south pier. The project depth is referred to
low-water datum for Lake Michigan, which is 578.5 feet above mean
tide at New York. The fluctuations of water level are seasonal
changes of about one-half foot above or below the annual mean stage,
and extreme fluctuations of a temporary nature, due to wind and
barometric pressure, of about 11/2 feet above or below the mean lake
level prevailing at the time.
    The estimate of cost for new work, revised in 1902, was $344,300.
There is no approved estimate for annual maintenance.
    The existing project was adopted by the River and Harbor Act
of March 3, 1879 (Annual Report for 1879, p. 1634). The latest pub-
lished map is in House Document No. 588, Sixty-fourth Congress,
first session.
    Recommended modifications of project.-Legislation authorizing
the abandonment of the project for this harbor is recommended in
House Document No. 588, Sixty-fourth Congress, first session.
    Terminal facilities.-There are inexpensive landing places at the
inner end of Portage Lake. The facilities are considered adequate for
existing commerce.
    Operations and results during fiscal year.-Operations consisted of
taking soundings by hired labor and use of Government plant, at a
total cost of $695.90 for maintenance. The total net expenditures
were $327.99.
    Condition at end of fiscal year.-The existing project was substan-
tially completed in 1912 at a saving of $88,171 under the estimated
cost. The piers and revetments were completed in 1901 and are in
fair condition. The dredging was completed in 1912 except for a
small amount of hard material in the inner half of the channel. The
controlling depth at low-water datum at the close of the fiscal year
was 8.4 feet in a channel about 100 feet wide between the piers to
Portage Lake. The costs under the existing project are $256,129.21
for new work and $197,783.20 for maintenance, a total of $453,912.41.
The total expenditures are $455,366.73.
   Proposed operations.-The balance unexpended, together with an
allotment of $11,000, made during July, will be applied as follows:
Accounts payable June 30, 1937-________________                _-_        $57. 33
Maintenance:
    Operation of U. S. bucket dredge Tompkins, August-September
      1937-------------------------------------------------             8, 001.95
    Riprap piers and revetments with United States plant, 1,000 tons,
      at $3, August-September 1937 ---------------------------   _      3, 000. 00
           Tota-------------------------------------------1,092
        Total__
             --------                   _____              11,059, 28
  Dredging is required annually for maintenance of project dimen-
sions of channel. The piers and revetments need additional riprap.
1252             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

The additional sum of $11,000 can be profitably expended during
the fiscal year ending June 30, 1939, as follows:
    Maintenance:
       Operation of U. S. bucket dredge Tompkins, fall of 1938----------$8, 000
       Riprap piers and revetments, 1,000 tons, at $3, with United States
          plant, summer and fall of 1938--        -      -___          ___
                                                                _____-----3, 000

                Total--            ----------             ---------------------------------                             11, 000

                                           Cost and financial summary

Cost of new work to June 30, 1937_                                                                                 $256, 129.21
Cost of maintenance to June 30, 1937____-------------------                                                         197, 783. 20

      Total cost of permanent work to June 30, 1937__-----                                                         453, 912.41
Undistributed costs June 30, 1937_-----------------------------                                                      1,511. 65

     Net total cost to June 30, 1937_     __________-------------                                                  455, 424. 06
Minus accounts payable June 30, 1937____
                                      -------------------                                                                57. 33

     Net total expenditures __________________--------------------------------                                     455, 366. 73
Unexpended balance June 30, 1937_ -----------------------                                                                59. 28

            Total amount appropriated to June 30, 1937_____--                                       -----          455, 426. 01

           Fiscal year ending June 30                      1933              1934        1935               1936         1937


Cost of new work......              -_•.                 ..___             __      .-                         .
Cost of maintenance _-__         . ___-.              _ $2, 548. 60
                                                    -__.                $30, 914. 14  $1,163.35         $4.190.66         $695. 90
T
    otal expended- ......--
                         . ....---.-----        -   -     2, 384. 53     30, 967. 02   2, 575. 32       4,470.39           327.99
Allotted ........-................
                              --- 5,000. 00
                          ......                                         28, 728. 67   10,500.00 -------               ---7,100.00

                                   ---
Balance unexpended July 1, 1936___________    -      ______-                                                         $7, 487.27
Deductions on account of revocation of allotment_______________                                                       7,100. 00
      Net amount to be accounted for--------------------------                                                          387.27
Gross amount expended_------------ --------------------------                                                           327.99

      Balance unexpended June 30, 1937-- __- ------------------                                                          59. 28
Outstanding liabilities June 30, 1937_ ____---     -__--__-_____---57.                                                       33

     Balance available June 30, 1937_____ ___-_____---__-1.       95
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------11,000.00

           Balance available for fiscal year 1938 -------                                           ______11, 001.95
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1------                      -   _------______
                                                            ____  11, 000.00
     1 Exclusive of available funds.


                                 29. FRANKFORT HARBOR, MICH.

  Location.-This harbor is on the east shore of Lake Michigan, dis-
tant about 204 miles northeasterly from Chicago and about 28 miles
northerly from Manistee. (See U. S. Lake Survey Chart No. 77.)
  Existing project.- This provides for an exterior basin in Lake
Michigan, formed by two breakwaters, 450 feet apart at the outer
ends, diverging at an angle of about 900, the main arm and the shore
connection of the north breakwater being 972 and 1,000 feet in
length, respectively, and the main arm and the shore connection of
the south breakwater being 1,188 and 1,400 feet in length, respec-
       RIVERS AND HARBORS--MILWAUKEE,          WIS., DISTRICT     1253
tively; for the removal of 801 feet of the north and 1,172 feet of the
south pier; dredging the basin 20 feet deep and 800 feet wide at
the entrance, decreasing toward the new pierheads to 600 feet wide;
dredging the channel between the piers 18 feet deep to Lake Betsie
 (Aux Becs Scies); and dredging to a depth of 18 feet, to within 50
feet of existing structures, that area in Lake Betsie west of the east
boundary of Fifth Street extended. The breakwaters and shore
connections are built of concrete caissons and piling capped with
concrete. The inner piers and revetments are built of timber cribs
and piling. all having been capped with concrete.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluc-
tuations of a temporary nature, due to wind and barometric pres-
sure, of about 11/2 feet above or below the mean lake level prevailing
at the time.
   The estimate of cost for new work, revised in 1937, was $1,754,000.
The latest (1937) approved estimated annual cost of maintenance
is $16,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1866, as amended in 1868, 1879, and
1892, provided for a new outlet 12 feet deep, protected by piers and
revetments; the act of June 3, 1896, provided for a depth of 18 feet
 (annual report for 1902, p. 473) ; the act of March 3, 1925, provided
for the exterior breakwaters, removal of portions of piers, and pres-
ent dimensions of channel (H. Doc. No. 208, 68th Cong., 1st sess.);
and the act of August 26, 1937, provided for dredging the area in
Lake Betsie (H. Doc. No. 511, 74th Cong., 2d sess.). The latest
published map is in the last-mentioned document.
   Local cooperation.-The act of August 26, 1937, provided that
local interests give assurances satisfactory to the Secretary of War
that they will provide a channel at least 100 feet wide, 14 feet deep,
and 400 feet long from the east line of Fifth Street extended to the
city dock within 1 year after completion of the proposed inner
harbor dredging by the United States, and, in addition, furnish,
free of cost to the United States, suitable spoil-disposal areas for
new work and subsequent maintenance. No final action on compli-
ance with the above has been taken. All prior requirements have
been fully complied with.
   Terminal facilities.--The railroad terminal, consisting of two car-
ferry slips, is on the south side at inner end of the entrance channel.
There are also several fishing wharves. The city has constructed a
wharf on the north side of Lake Betsie available for boats of shdl-
low draft. The facilities are considered adequate for existing com-
merce.
   Operations and results during fiscal year.-Operations consisted
of taking soundings, by hired labor and use of Government plant,
at a total cost of $585.40 for maintenance. The total net expendi-
tures were $825.81.
   Condition at end of fiscal year.-The project in effect prior to the
modification of August 26, 1937, was completed in 1932. Construc-
tion of the south breakwater and shore connection, removal of south
pier, and dredging south half of channel were completed in 1931.
1254       REPORT OF CHIEF OF ENGINEERS,' U. S. ARMY, 1937

The north breakwater and shore connection and the remainder of
the pier removal and dredging was completed in 1932. No work
has been done on the last modification of the project providing for
dredging the area in Lake Betsie. The breakwaters, shore connec-
tions and inner piers and revetments are in good condition. The
controlling depth at low-water datum at the close of the fiscal year
was 21.5 feet in the channel through the outer basin and in the
channel between the inner piers to Lake Betsie. The depths over
the area to be dredged in Lake Betsie vary from 2.5 to 18 feet. The
costs under the existing project are $1,684,704.35 for new work and
$400,618.88 for maintenance, a total of $2,085,323.23. The total ex-
penditures are $2,086,084.14.
   Proposed operations.-The balance unexpended, together with an
allotment of $13,000 for maintenance on July 20, 1937. less a revoca-
tion of $200, made during July, will be applied as follows:
Accounts payable June 30, 1937                _____            _ ________--   _          $44. 47
Maintenance :
   Operation of U. S. hopper dredge Meade, about September 1937
      and June 1938 ____      __--_- _____-__                                          9,053.13
   Riprap breakwaters and piers with United States plant, 1,000
                                      ----------------------------
      tons, at $4, July-September 1937_                                                4, 000. 00

          Total                   --------------------                               13, 097. 60

  The dredging in Lake Betsie should be done as soon as local co-
operation has been complied with and funds become available.
Dredging is required annually for maintenance of project dimensions
of entrance channel. Additional riprap is required for the break-
waters and piers. The additional sum of $82,000 can be profitably
expended during the fiscal year ending June 30, 1939, as follows:
New work: Dredging to a depth of 18 feet, that area in Lake Betsie
  west of the east line of Fifth Street, extended, by contract, summer
  and fall of 1938________________------------------------------------------------$69, 000
Maintenance :
    Operation of U. S. hopper dredge Meade, fall of 1938, and
      spring of 1939--------------------------------------                $9, 000
    Riprap breakwaters and piers, 1,000 tons, at $4, with United
      States plant, summer and fall of 1938_------------------ 4, 000
                                                                                     13, 000

          Total -----------------------------------------------------                    82, 000
                             Cost and financial summary

Cost of new work to June 30, 1937-------------------                      -   $1, 684, 704. 35
Cost of maintenance to June 30, 1937                     ----------                 400, 618. 88

      Total cost of permanent work to June 30, 1937_                              2, 085, 323. 23
Undistributed costs June 30, 1937_--                                                      805. 38

     Net total cost to June 30, 1937                                              2, 086, 128. 61
Minus accounts payable June 30, 1937-........--                                            44. 47

       Net total expenditures                                                     2, 086, 084. 14
Unexpended balance June 30, 1937__---                                                    297. 60

       Total amount appropriated to June 30, 1937_________                        2, 086, 381. 74
             RIVERS AND HARBORS-MILWAUKEE,                                                 WIS., DISTRICT                     1255

    Fiscal year ending June 30               1933                1934                 1935               1936                1937

Cost of new work _____________            $332, 506. 50
Cost of maintenance .. ____.....             4, 251. 04       $45, 873. 59        $44, 018. 23          $4,201.99              $585.40
        Total cost.--------------.         336, 757. 54         45, 873. 59         44, 018.23           4, 201. 99             585.40
Total expended--_
               ..............              393, 895. 18         52, 266. 66         34, 543. 58         11, 094. 10             825. 81
Allotted--_---------.-------.--            206, 465. 00        133, 113. 38      -29, 500. 00          -2, 500. 00         -15, 500.00


Balance unexpended July 1, 1936_        -     -_____------     --                                                     $16, 623.41
Deductions on account of revocation of allotment -------------                                                         15, 500. 00

      Net amount to be accounted for ___ ______ __1,                                                                         123.41
Gross amount expended----__________________-_____                                                                            825.81
      Balance unexpended June 30, 1937______----                                                                            297. 60
                                         --
Outstanding liabilities June 30, 1937_____________                                                     __-            -      44. 47
          Balance available June 30, 1937__                                --         --                                     253. 13
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_ ____-_________                                                                                   13,000.00
          Balance available for fiscal year 1938-------------------                                                   113, 253. 13

Amount (estimated) required to be appropriated for completion
   of    existing project        2_                                                                                    69, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                 69,000.00
                    - - - - - ---- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For maintenance                                                                                                     13, 000.00

          Total 2- - - - - - -        -    - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                                       82, 000. 00
   1Incudes $200 revoked during July 1937.
   1 Exclusive of available funds.

                                     30. LELAND HARBOR, MICH.

   Location.-This harbor is on the east shore of Lake Michigan at
the mouth of Carp (Leelanau) River, Mich., distant about 240 miles
northeasterly from Chicago and about 35 miles northerly from
Frankfort. (See U. S. Lake Survey Chart No. 78.)
   Existing project.-This provides for the removal of the wrecked
outer portions of the old privately owned piers; for the construction
of new piers converging from shore to an entrance 60 feet wide,
the lengths to be 370 and: 440 feet for the north and south piers,
respectively; and for an entrance channel 6 feet deep and 40 feet
wide, the inner end of channel being about 320 feet inside of the
harbor entrance. The existing piers are formed of timber cribs
and piling.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of about one-half foot above
or below the annual mean stage, and extreme fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, made in 1935, is $60,000. The
latest (1935) approved estimate for annual cost of maintenance is
$1,000.
1256           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 23,
74th Cong., 1st sess.). The latest published map is in the project
document.
   Terminal facilities.-There are privately owned wharves on each
side of the inner harbor extending from the dam located about 400
feet above the mouth of the river, for a distance of about 200 feet
downstream, used principally by the local fishing interests, and to
some extent by government mail, Coast Guard, and lighthouse boats.
All available dockage space is utilized but additional moorage area
is to be provided by inner harbor enlargements.
   Operations and results during fiscal year.-Operationsconsisted of
constructing new converging-pile piers having lengths of 370 feet
and 440 feet for the north and south piers, respectively, and removing
237 linear feet of the old privately owned north and south piers and
all appurtenant work which included dredging a channel to project
dimensions, by contract, at a total cost of $64,181.34 for new work.
The total net expenditures were $48,391.96.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1937. The converging piers, removal of outer portions of
the old privately owned piers, and dredging, was completed in 1937.
The remaining portions of the private piers are in poor condition.
Prior to the work done by the Government the harbor had been
built and maintained entirely by local interests without assistance.
Carp River, about 4,000 feet long, connects Leelanau Lake with Lake
Michigan. There is a concrete dam with a 9-foot head about 400 feet
above the river mouth. The controlling depths at low-water datum
at the close of the fiscal year were 8 feet at entrance, thence 6 feet
through outer harbor, and 4 feet in river to the dam. The cost under
the existing project is $64,181.34 for new work. The total expendi-
tures are $48,949.88.
   Proposed operations.-The balance unexpended will be applied to
the payment of outstanding liabilities and to maintenance contin-
gencies.
   No additional work is contemplated and no additional funds can
be profitably expended during the fiscal year ending June 30, 1939.
                                         Cost and financial summary
Cost of new work to June 30, 1937_---------------------------- $64, 181. 34
Cost of maintenance to June 30, 1937-----------------------__

      Total cost of permanent work to June 30, 1937_-------------                                       4, 181. 34
Minus accounts payable June 30, 1937-------------------------                                          15, 231. 46
     Net total expenditures --------------
                             _ ______                        48, 949. 88
Unexpended balance June 30, 1937----------------------------16, 050. 12
           Total amount appropriated to June 30, 1937----------------                                  65, 000. 00

           Fiscal year ending June 30                 1933             1934        1935     1936           1937


                   ------------------------------------------------------
Cost of new work..........................                                                               $64,181.34
Cost of maintenance........
Total expended----------------------------- ------------ ------------                       $557. 92      48, 391. 96
Allotted       -...................................      ...........          __   _____   60, . 00        5,000. 00
       RIVERS AND HARBORS--MILWAUKEE,          WIS., DISTRICT       1257
Balance unexpended July 1, 1936  --------                      $59,442.08
Amount allotted from War Department Appropriation   Act ap-
  proved May 15, 1936-- __- _   ____                             5, 000.00
      Amount to be accounted for                               6--------------------------4,4
 -ross amount expended __     -_______-______----_____         48, 391.96
     Balance unexpended June 30, 1937---------------------     16,050.12
Amount covered by uncompleted contracts --- ___-___---__-      15, 282.48
     Balance available June 30, 1937------------------------       767.64

                  31. CHARLEVOIX HARBOR, MICH.

   Location.-On the east shore of Lake Michigan, distant about
276 miles northeasterly from Chicago and about 75 miles northerly
from Frankfort. (See U. S. Lake Survey Chart No. 789.)
   Existing project.-This provides for a chanel 15 feet deep from
Lake Michigan to Lake Charlevoix protected where needed by
piers and revetments. The piers at the entrance are formed of stone-
filled timber cribs and rubblestone, being 781 feet and 452 feet in
length on north and south sides, respectively. The outer 25 feet of
the south pier has been capped with concrete superstructure; the
remainder and the outer 303 feet of the north pier have been paved
with concrete. The revetments are built of piling and are capped
with concrete.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York.
   The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, revised in 1902, was $186,000.
The latest (1928) approved estimate of cost for annual maintenance
is $8,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 14, 1876, provided for the channel
from Lake Michigan to Round Lake; act of August 2, 1882, pro-
vided for the channel from Round Lake to Lake Charlevoix act of
June 13, 1902, increased the project depth from 12 to 15 feet. The
latest published map is in House Document No. 26, Sixty-third
Congress, first session.
   Terminal facilities.-These consist of several small landing places
in Round Lake at Charlevoix used for handling fish and miscel-
laneous commodities. The city of Charlevoix has provided a public
wharf south of the inner end of the lower south revetment. There
is also a coal wharf at Boyne City at the inner end of Lake Char-
levoix. The city of Boyne City has provided a public wharf for
small craft. These facilities are considered adequate for existing
commerce.
    Operations and results during fiscal year.-Operations consisted
of taking soundings, by hired labor and use of Government plant,
at a total cost of $324.53 for maintenance. The total net expendi-
tures were $809.32.
1258             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Condition at-end of fiscal year.-The existing project was com-
pleted in 1902 at a saving of $105,795 under the estimated cost. The
north pier and revetment of the lower channel was completed in
1880, and the south pier and revetment in 1889. The revetments
of the upper channel were completed in 1885, and the dredging of
both channels in 1902. The piers and revetments of the lower chan-
nel and the south revetment of the upper channel are in generally
fair condition. The north revetment of the upper channel has been
removed, a portion being removed in 1928 and the remainder in
1930. The controlling depths at low-water datum at the close of the
fiscal year were 17.9 feet in the lower channel to Round Lake and
15.8 feet in the upper channel to Lake Charlevoix. The costs under
the existing project are $80,205.04 for new work and $304,581.98
for maintenance, a total of $384,787.02. The total expenditures are
$385,340.57.
   Proposed operations.--The balance unexpended, together with an
  llotment of $6,500, made during July, will be applied as follows:
Accounts payable June 30, 1937
Maintenance: Operation of U. S. hopper dredge Meade, July 1937 and
                                                                      -----------
                                                                      $90. 39

  June 1938---------------------------------------------------     8, 255. 36

            Total __----------------------------------------------------                                   8, 345. 75
   Dredging is required annually for maintenance of project dimen-
sions of channel. The piers and revetments require additional rip-
rap. The additional sum of $9,000 can be profitably expended
during the fiscal year ending June 30, 1939, as follows:
Maintenance:
   Operation of U. S. hopper dredge Meade, fall of 1938------------- $6, 600
   Riprap piers and revetments, 800 tons, at $3, with United States
      plant, summer of 1938---------------------------------------    2, 400

            Total------------                   -------------------------------------                         9, 000

                                          Cost and financial summary
Cost of new work to June 30, 1937---------------   ----------    $80, 205. 04
Cost of maintenance to June 30, 1937----------------------------304, 581.98
      Total cost of permanent work to June 30, 1937-------------                                       384, 787. 02
Undistributed costs June 30, 1937-----      -------------------                                             643. 94
     Net total cost to June 30, 1937-          -------------------                                     385, 430. 96
Minus accounts payable June 30, 1937---- -----------------------                                             90. 39
     Net total expenditures-------------------------------                                             385, 340. 57
Unexpended balance June 30, 1937---------------1,                                                           845. 75
           Total amount appropriated to June 30. 1937-...                                              387, 186. 32

          Fiscal year ending June 30               1933          1934           1935           1936           1937

Cost of new work     -..........-.....-          $- ---                            - -- ----     -
Cost of maintenance--        -$2,                   667. 38    $4, 970. 35   $20, 803. 90    $7, 434. 37       $324.53
Total expended---         -         -      -      2, 330. 64    5,456. 63     12, 094.42     15, 667. 38       809. 32
Allotted_        -----------------------------1, 950. 00        5, 350. 00    35, 000. 00   -4,500. 00      -5, 500. 00
         RIVERS AND HARBORS-MILWAUKEE,                      WIS., DISTRICT          1259
Balance unexpended July 1, 1936------------------------------                   $8, 155.07
Deductions on account of revocation of allotment--------------_                  5, 500. 00

      Net amount to be accounted for__-------------------------                  2, 655. 07
Gross amount expended-------------------------------    ----------                  809. 32

      Balance unexpended June 30, 1937_____________----------_        _          1, 845. 75
Outstanding liabilities June 30, 1937___    -------------                            90. 39

     Balance available June 30, 1937________-----------------------              1, 755.36
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------- ---------------------------                      6, 500. 00

      Balance available for fiscal year 1938_---------------------               8, 255. 36
Amount that can be profitably   expended in fiscal year ending June
                            - --- --- --- --- --- ---- --- --- --- --- --- --
30, 1939, for maintenance 1                                                     9,000.00
  1 Exclusive of available funds.

                        32. GRAYS REEF PASSAGE, MICH.

   Location.-This passage lies between Grays Reef and Vienna Shoal,
in the northeasterly end of Lake Michigan. It is the only deep-draft
navigable opening between the Straits of Mackinac and that portion
of Lake Michigan lying easterly of Beaver, Fox, and Manitou Islands.
The total width of the passage between the reefs is about 21/4 miles.
 (See U. S. Lake Survey Chart No. 79.)
   Existing project.-This provides for the improvement of Grays
Reef Passage over a width of 3,000 feet and a depth of 25 feet
through the east channel.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of about one-half foot above
or below the annual mean stage, and extreme fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, made in 1935, is $132,400. No
estimate for annual cost of maintenance has been made as no mainte-
nance will probably be required for an indefinite time.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 5,
74th Cong., 1st sess.). The latest published map is in the project
document.
   Terminal facilities.-The passage is a through, unprotected water-
way having no terminal facilities.
   Operations and results during fiscal year.-Operationsconsisted of
dredging 43,104 cubic yards, by contract, to obtain the new project
width and depth of 25 feet through the east channel at a total cost of
$109,520.63 for new work. The total net expenditures were
$107,714.97.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936 at a saving of $22,879 under the estimated cost.
Dredging the east channel was completed in 1936. The controlling
depth at low water datum, in the improved east channel, at the close
of the fiscal year was 25 feet over a width of 3,000 feet. The west
channel, formerly used by large vessels but no longer marked by
navigation aids, is generally about 1,600 feet wide between shoals hnd
had a controlling depth of about 241/2 feet over a width of about
1260            REPORT 'OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

1,100 feet. The total cost and expenditures under the existing project
are $109,520.63 for new work.
   Proposed operations.-No funds are available and no work is
contemplated during the fiscal years 1938 or 1939.
                                               Cost and financial summary

Cost of new work to June, 1937-----------------------------$109, 520. 63'
Cost of maintenance to June 30, 1937----------------
      Total cost of permanent work to June 30, 1937----------                                                      109;. 520. 63
Net total expenditures    ------------------------------------                                                      09, 520.63
Total amount appropriated to June 30, 1937_---      -_______----
                                                              -                                                    109, 520. 63

          Fiscal year ending June 30                       1933               1934          1935           19361            1937


Cost of new work.....--             ------------------------------------------...........------------       $109, 520. 63
Cost of maintenance .......           ...    ...    ..   ...    ...    ...     . . ...
                                                                               ----------    -----------------
                                                                                              ...     ..--     --------
Total expended.......------------------------....................----------     ----- ------------       $1, 805. 66      107, 714. 97
Allotted................---------------------       ------------ ------------ ---------- 132, 400. 00                    -22, 879. 37


Balance unexpended July 1, 1936     --------------------------- $130, 594. 34
Deductions on account of revocation of allotment---------------   22, 879. 37

      Not amount to be accounted for1_______- __-____----                                                          107, 714.97
Gross amount expended-----------------------------                                                         _       107T, 714.97

     33. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                         (GENERAL)

  The cost of work during the year was $27,634.90 and the expendi-
tures were $29,561.94. The balance unexpended, including an allot-
ment of $24,000, made during July, $28,649.48, will be applied as
needed during the fiscal year 1938, to payment of expenses to be
incurred under this heading. The additional sum of $25,000 can be
profitably expended during the fiscal year ending June 30, 1939.
                                           Cost and financial summary

Cost of maintenance to June 30, 1937------------------------ $126, 940. 18
Minus accounts payable June 30, 1937___-------------------------- 1, 459. 66

     Net total expenditures--   --------------------------                                                             125,480. 52
Unexpended balance June 30, 1937----------------------------                                                             4, 649. 48

           Total amount appropriated to June 30, 1937------__--------                                                  130, 130.00

           Fiscal year ending June 30                       1933               1934          1935           1936             1937


Cost of new work-.....-----                              -----------------------
Cost of maintenance      ------------------- $6, 617. 94
                         ___                                    $9, 373.28        $17,446. 71            $33, 586. 64     $27, 634. 90

Total expended...__....__...._       _.....     .....     7, 575. 27         9, 388. 34   17, 149. 12    30, 808. 71       29, 561. 94

Allotted.................-----------------------------..6, 830. 00       16, 000. 00      21, 000. 00    37, 000. 00       17, 000. 00


Balance unexpended July 1, 1936_______________--__                                                                    $17, 211. 42
Amount          allotted from War Department                             Appropriation             Act ap-
    proved May 15, 1936----------_                                                                                       7, 000. 00
                                                                                                                        1---------------------------

           Amount to be accounted for----
                                      ......                                                                            34, 211. 42
                RIVERS AND HARBORS--MILWAUKEE,                                                           WIS., DISTRICT                      1261
Gross amount expended -----   --
                             ____  __ --  -_____  $29, 857. 31
Less reimbursements collected---------------------    295.37
                                                                                                                                       $29,561.94
    Balance unexpended June 30, 1937_____________------------                                                                            4, 649. 48
Outstanding liabilities June 30, 1937-__-- -- _ _--------------                                                                          1i, 459. 66
     Balance available June 30, 1937------------------------                                                                             3, 189. 82
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--      ---------------------------------                                                                        24, 000. 00
      Balance available for fiscal year 1938 ------------------                                                                         27, 189. 82
Amount that can be protably expended in fiscal year ending June 30,
1939, for maintenance 1        -___________-___-__-----__      ___                                                                     25, 000. 00
1Exclusive of available funds.
     34. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                                 (Commercial statistics for these projects are given in pt. 2 of report)

                                                                               For last           Cost and expenditures to
                                                                             full report                June 30, 1937                   Estimated
                        Name of project                                      see annual                                                 amount re-
                                                                                 report                                                  quired to
                                                                                  for-            New work           Maintenance         complete


1.   Oconto Harbor, Wis.         --.--------           1936                                       $130, 753.   72      $25, 976. 93     Completed.
2.   Gladstone Harbor, Mich.2.------------------191.2                                                7, 280.   59           252. 17        Do.
3.   St. Joseph River, Mich.2....--------------------- 1923                                          4, 555.   49        5, 194. 51        Do.
4.   Petoskey Harbor, Mich.3------ -------------       1931                                        118, 239.   40       75, 044. 02        Do.

  I Improvement adequate for existing commerce.
     2
    Channels adequate for commerce, abandonment recommended in 1926 (H. Doc. No. 467, 69th Cong.,
1st sess.).
  3 Project provides only for breakwater, which was completed in 1908; superstructure was rebuilt in con-
crete and structure fully riprapped in 1930.

           35. PLANT ALLOTMENT                                     FOR MILWAUKEE, WIS., DISTRICT
                                                  Cost and financial summary

Undistributed costs June 30, 1937________------____                                                                             $1, 369, 557. 53
Plus accounts receivable June 30, 1937 -------------- -                                                                              96, 057. 30
     Gross total costs to June 30, 1937----------- ---------                                                                     1, 465, 614. 83
Minus accounts payable June 30, 1937------------------------                                                                         30, 821. 76
     Net total expenditures-----------                     1, 434, 793. 07
Unexpended balance June 30, 1937-__-----------------------     81, 651. 53

            Total amount appropriated to June 30, 1937_----                                                         _____        1, 516, 444. 60

     Fiscal year ending June 30                          1933                    1934                 1935               1936               1937


Total expended...------------..............---          ---------............................
                                                                     ------------               $1, 405,512. 71        $51, 331. 77      -$22, 051. 41

Allotted.....................................--------------           ------------..............1,482, 664. 02          33, 780. 58

Balance unexpended July 1, 1936 -------------------------                                                                              $59, 600. 12
Gross amount expended----------------------        $707, 997.33
Less:
    Reimbursements collected ------- $728,781. 45
    Receipts from sales-                1, 267. 29
                                                    730, 048. 74
                                                                                                                                      -22, 051. 41

            Balance unexpended June 30, 1937                                                -         -------------                     81, 651. 53
1262          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937 ____--_____-_                                             _________-_    $74, 062. 26

     Balance available June 30, 1937 ___________ - ___-___                                                       7, 589. 27
Accounts receivable June 30, 1937____--
                                     ____________-_______                                                       96, 057. 30

         Unobligated balance available June 30, 1937____--_--                                             _    103, 646. 57

Status of reports called for by river and harbor acts and committee resolutions

        Locality                              Authorization act   Transmitted
                                                                  to Congress              Document no.        Recommenda-
                                                                                                                   tion


Charlevoix      Harbor,  Senate       committee
  Mich.                     resolution, Mar. 30,
                            1937.
Escanaba Harbor, Mich_ River       and Harbor
                            Act, Aug. 26, 1937.
Fond du Lac Harbor      River and        Harbor                  Jan.   23, 1937                              Unfavorable.
  and vicinity, Lake        Act, Aug. 30, 1935.
  Winnebago, Wis.
Gladstone        Harbor, River and Harbor
   Mich.                    Act, Aug. 26, 1937.
Glen Haven and Glen -- do .---------
  Arbor, Mich.
Grand Haven Harbor,      Rivers and Harbors                       July    1, 1936       Rivers and Harbors     Favorable.
  Mich.                     Committee resolu-                                             Committee, 1, 75th
                            tion. Jan. 24, 1936.                                          Cong., 1st sess.
Grand Traverse Bay,      River and Harbor
  Mich.                     Act, Aug. 26, 1937.
Green Bay Harbor and Rivers and Harbors
   Fox River, Wis.          Committee resolu-
                           tion, Feb. 11, 1936.
Kenosha Harbor, Wis___ Senate committee res-                      Dec. 10, 1936                                Unfavorable.
                            olution, July 31,
                            1935.
    Do---      _-        River and Harbor
                            Act, Aug. 26, 1937.
Kewaunee Harbor, Wis_ Senate committee res-
                           olution,    June      3,
                            1937.
Lake Harbor, Mich-....   Rivers and Harbors
                            Committee resolu-
                           tion, Mar. 16, 1937.
Manistee Harbor, Mich_ Rivers and Harbors                         Feb. 25, 1937                                   Do.
                            Committee resolu-
                           tion, Feb. 13, 1935.
Manitowoc and Two River and Harbor                                Nov. 19, 1936                                   Do.
  Rivers, Wis., harbor     Act, Aug. 30, 1935.
  of refuge.
Michigan      Lake    to _ do -..- _-----   ---                   Dec. 12, 1936     -                             Do.
  Grand Rapids, Mich.,
  waterway via Black
  Lake, Zeeland, Hud-
  sonville,     Jemison,
  Grandville, and
  Grand River or any
  alternative route.
Miller Bay, Lake Win- River and Harbor
  nebago, Wis.             Act, Aug. 26, 1937.
Milwaukee Harbor, Wis_ Senate committee res-
                           olution, Mar.         2,
                           1936.
Mona Lake (Lake Har-     River and Harbor
  bor) Channel, Mich.      Act, Aug. 26, 1937.
Petoskey Harbor, Mich_         o _.............
                              - - - - -d


Racine Harbor, Wis....   Rivers and Harbors                       July   14, 1937   Rivers and Harbors         Favorable.
                           Committee resolu-                                          Committee, 46, 75th
                           tion, June 13, 1934.                                       Cong., 1st sess.
St. Josephs      Harbor, Rivers and Harbors
  Mich.                    Committee resolu-
                           tion, Jan. 27, 1937.
Traverse Bay, Mich ...        do ................
                              -   -   -   -   -


Washington Island,       River and Harbor                         Nov. 18, 1936     House, 90, 75th Cong.,        Do.
  Door County, Wis.,      Act, Aug. 30, 1935.                                        1st sess.
  channels.
                          i
           RIVERS AND HARBORS-CHICAGO,                ILL., DISTRICT          1263
     IMPROVEMENT OF RIVERS AND HARBORS IN THE
               CHICAGO, ILL., DISTRICT
                               GREAT LAKES DIVISION


   This district lies partly within the upper Mississippi Valley divi-
sion and partly within the Great Lakes division.
   The portion within the Great Lakes division includes the harbors
on Lake Michigan from Waukegan, Ill., to Michigan City, Ind.,
inclusive, together with the navigable waterways entering Lake Mich-
igan at Chicago and Michigan City, or between them, and the navi-
gable tributaries of such waterways. For portion within the upper
Mississippi Valley division, see page 970.
   District engineer : Lt. Col. Donald H. Connolly, Corps of Engineers.
Acting district engineer: Capt. S. N. Karrick.
   Division engineer: Col. L. V. Frazier, Corps of Engineers.
                                     IMPROVEMENTS


                                      Page                                     Page
1. Waukegan Harbor, Ill ...      _    1263 6. Indiana Harbor, Ind_-            1277
2. Chicago Harbor, Ill _.....         1.266 7. Michigan City Harbor, Ind__     1283
3. Chicago River, Ill_                1268 8. Examinations, sqrveys, and
4. Calumet Harbor and River,                    contingencies (general) ...    1286
     Ill. and Ind_            --      1270 9. Plant allotment-__________-_     1287
5. Lake Calumet, Ill-                 1276

                        1. WAUKEGAN HARBOR, ILL.

   Location.-This harbor is on the west shore of Lake Michigan,
distant about 51 miles south of Milwaukee and about 38 miles north
from Chicago. (See U. S. Lake Survey Chart No. 74.)
   Previous projects.-An appropriation of $15,000 was made by the
River and Harbort Act of August 30, 1852, for a breakwater. This
work was abandoned. The original project was adopted by River
and Harbor Act of June 14, 1880, and modified by River and Harbor
Act of August 2, 1882. The cost and expenditures prior to com-
mencement of the existing project in 1903, and including appropria-
tion of $15,000 made by the River and Harbor Act of August 30, 1852,
were $218,233.54 for new work and $15,710.87 for maintenance, a
total of $233,944.41. (For further details see p. 1940 of Annual Re-
port for 1915.)'
   Existing project.-This provides for-
   (a) A detached timber crib breakwater 600 feet long, and the construction of
a northerly and westerly extension to shore about 1,300 feet long.
   (b) Two parallel piers of timber cribs and piling, about 240 feet apart, 1,613
and 3,212 feet long for the north and south pier, respectively, the inshore end of
south pier being on a line diverging from the general line of the pier (Annual
Report for 1906, p. 1760.)
   (c) A channel 200 feet wide, 18 feet deep, extending from Lake Michigan to
an inner basin of the same depth, protected on the east side by a pile revet-
ment 882 feet long; including a bulkhead estimated to cost $30,000. in front of
the city park, with additional dredging near the lake end of the north pier, and
enlarging the inner basin.
   The project depth is referred to low-water datlm for Lake Michi-
gan, which is 578.5 feet above mean tide at New York. The fluctua-
tions of water level are seasonal changes of aboult one-half foot above
or below the annual mean stage, and extreme fluctuations of a tem-
       20196-37--pt. 1----80
1264     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

porary nature, due to wind and barometric pressure, of about 11/2
feet above or below the mean lake level prevailing 'at the time.
    The estimate of cost for new work, revised in 1930, is $614,300,
exclusive of amounts expended on previous projects, but including
$30,000 (cost of bulkhead) to be contributed by local interests. The
latest (1930) approved estimate for annual cost of maintenance is
$7,000, on the completion of the project.
    The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the parallel
piers and basin (Annual Report for 1880, p. 1942); act of June 13,
1902, provided for the detached breakwater, for extending the piers,
and for the present channel dimensions (H. Doc. No. 343, 56th Cong.,
1st sess.); act of July 3, 1930, provided for the extension of the
breakwater to shore, dredging near the outer end of the north pier,
and enlarging the inner basin (Rivers and Harbors Committee Doc.
No. 27, 71st Cong., 2d sess.) (For latest published map see the last-
mentioned document.)
    Local cooperation.--The River and Harbor Act approved July 3,
1930, provided that no work shall be done on enlarging the inner
basin until local interests have given assurances satisfactory to the
Secretary of War and the Chief of Engineers that they will assume
the cost of a bulkhead in front of the city park at an estimated cost
,of $30,000. These assurances have not been given.
    Terminal facilities.-These consist of a wharf 1,000 feet long,
 -owned by the North Shore Coke & Chemical Co., equipped with a
 .coal-handling tower, and two coal wharves, one salt wharf and one
package-freight and fishing wharf, all owned by the city of Wauke-
gan. The facilities are considered adequate for existing commerce.
    Operations and results during fiscal year.-A total of 89,871 cubic
.yards of material (place measurement) was dredged from the en-
trance channel and inner basin by the U. S. dredge Kewaunee at a
cost of $41,041.83. Previous preliminary costs on proposed riprap-
ping piers and breakwaters were reduced in the amount of $15.89.
The total cost was $41,025.94, all maintenance. Total expenditures
were $43,341.38.
    Condition at end of fiscal year.-The existing project is about 90
percent complete. The north pier and east revetment were completed
in 1904 and the south pier in 1909. The outer 600 feet of breakwater
was completed in 1904 and its shore-arm extension in 1931. All
structures are in good condition. The controlling depths are 22.5
feet in the entrance channel to the outer end of the south pier and
18 feet in the remaining portion of the entrance channel and basin.
Depths are based on soundings taken in May 1937 and are referred to
low-water datum. The mean water level in June 1937 was 0.10 foot
above datum. The work remaining to be done to complete the
project is dredging to enlarge the inner basin and near the outer end
of the entrance piers.
    The total cost was $1,340,448.91, of which $533,524.82 was for new
work and $806,924.09 for maintenance. Total expenditures were
$1,340,448.91.
               RIVERS AND HARBORS-CHICAGO,                                    ILL., DISTRICT                   1265
  Proposed operations.-The balance unexpended, together with an
allotment of $15,000 approved July 27, 1937, will be applied as
follows:
New work: Dredging near harbor entrance, with Government plant,
  June and July 1938     ------------------------------------     $15, 000.00
Maintenance: Repairs to piers, by contract, May and June 1938_ __   3,135. 14

        Total---------------------------------------------18,                                                 135. 14
  Dredging should be done to obtain project dimensions in the turn-
ing basin. Dredging is necessary to maintain the project depth in
the entrance channel and basin. Repairs to piers and breakwaters
will be required. The additional sum of $28,000 can be profitably
expended during the fiscal year 1939, as follows:
New work: Dredging to enlarge inner basin, with Government plant,
  July 1938 -----------------------------------   ------------------- $10,000
Maintenance:
    Dredging entrance channel and inner basin with Govern-
      ment plant, May 1939----------------------------$15,000
    Repairs to piers and breakwaters, by contract, June 1939_    3, 000
                                                                        18, 000

         Total-----------------------------------------------                                                  28, 000

                                        Cost and financial summary
Cost of new work to June 30, 1937- ------------------------  $751, 758. 36
Cost of maintenance to June 30, 1937------------------------822, 634.96
         Total cost of permanent work to June 30, 1937---------                                     1, 574, 393.32

Net total expenditures -----      _____-------1,                                                        574, 393. 32
Unexpended balance June 30, 1937----------------------------                                              3, 135.14

         Total amount appropriated to June 30, 1937-------------                                    1, 577, 528. 46

         Fiscal year ending June 30                 1933          1934           1935           1936            1937


Cost of new work....
Cost of maintenance-- ---------......            $71, 601. 26   $4, 934. 06    $4, 541. 44   $15, 258. 24     $41, 025. 94
Total expended.....-----------------------        58, 970. 32    9, 332.40      4, 562.15     12, 924. 73      43, 341.38
Allotted- -- -----------------------------.       41, 454.00     6, 500. 00     6, 081.93     45, 400. 00       1, 000. 00


Balance unexpended July 1, 1936__-_____ --                                                              $45, 476. 52
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936                                                                                         4, 000. 00
      Amount to. be accounted for_                                                                          49, 476. 52
Deductions on account of revocation of allotment_____
                                                   .......                                                   3, 000. 00
       Net amount to be accounted for -__-        ___-                                                      46,476. 52
Gross amount expended---------------                $43, 430. 72
                                                __ _---
Less reimbursements collected -------------------         89. 34
                                                                                                            43, 341. 38
      Balance unexpended June 30, 1937_________                                                              3, 135. 14
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937_                                 _                                                 15, 000. 00

      Balance available for fiscal year 1938________---------- _                                            18,135.14
Amount (estimated) required  to be appropriated for completion
                     1-
  of existing project ________________    _________                                                         10, 000. 00
    1Exclusive of available        funds.
1266          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -           $10, 000. 00
   For maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                 18, 000. 00
                   ---- --- ----- ---- ---- ---          - - - - - - - - - - - - - - - - - - - - - - -- - -
           Total                                                                                              28, 000. 00
   1   Exclusive of available funds.

                                     2. CHICAGO HARBOR, ILL.
   Location.-Northeastern Illinois, near the southern end of Lake
Michigan; 85 miles in a southerly direction from Milwaukee, Wis.
 (See U. S. Lake Survey Chart No. 752.)
   Previous projects.-Adopted by River and Harbor Act of March
2, 1833, and modified by River and Harbor Acts of June 23, 1866,
March 2, 1867, July 1, 1868, and April 10, 1869. Work was con-
tinued under these projects until 1870, the total cost and expendi-
tures being $446,005, the division between new work and maintenance
not being available. (For further details see p. 1941 of Annual
Report for 1915.)
   Existing project.-This provides for the following work:
   (a) An inner breakwater, all of timber cribs, enclosing an inner basin of
about 224 acres in extent, the breakwater being in two sections, as follows: The
main inner breakwater 4,036 feet long with 300 feet of shore return on north
end; a southerly extension 2,550 feet long.
   (b) An exterior breakwater enclosing an outer basin of about 970 acres in
extent, the breakwater being in two sections, as follows: The main exterior
breakwater built of timber cribs and 5,413 feet long, and the southerly exten-
sion built of rubble mound and concrete caissons and 5,000 feet long, exclusive
of the harbor entrance gap of 500 feet.
   (c) Maintenance dredging to a depth of 21 feet of that part of the inner
basin lying north of a line drawn eastwardly perpendicular to the eastern
boundary of Grant Park, from the northern end of said boundary, and also of
the entrance to Chicago River from the lake to Rush Street over a width vary-
ing from 470 to 190 feet.
   (d) Maintenance of that section of the North Pier, 900 feet long, located east
of the entrance to Ogden Slip.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York.
   Seasonal fluctuations in mean stage from low water in winter to
high water in summer average about 1.2 feet. Local and temporary
fluctuations of 0.1 to 0.5 foot due to wind and difference in barometric
pressures occur daily. Seiches of 3 to 4 feet occur at infrequent
intervals.
   The estimate of cost for new work, revised in 1914, was $3,686,500,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate of annual cost of maintenance is $50,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided for the inner break-
waters and inner basin (H. Doc. No. 114, 41st Cong., 2d sess., and
Annual Report for 1879, pp. 1562-1567); act of June 14, 1880, pro-
vided for the exterior breakwater (Annual Report for 1879, pp.
1562-1567); act of March 3, 1899, provided for the present depth
in the basin and entrance to Chicago River (Annual Report for 1897,
pp. 2790-2791) ; act of July 25, 1912, provided for the shore-arm
and southerly extension of the exterior breakwater (1H-.Doc. No.
710, 62d Cong., 2d sess.); and the act of March 2, 1919, modified
the area to be dredged in the inner basin (H. Doc. No. i1303, 64th
            RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                           1267
Cong., 1st sess.). The latest published map of this harbor is in the
Annual Report for 1914, opposite page 2924.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The outer harbor terminals consist of two
slips, one opening off from the main river, and one opening off from
the inner basin; wharves, fronting on the river itself, and a munici-
pal pier extending into the outer basin from the lake front at the
outer end of Grand Avenue.
   The outer harbor facilities are not entirely adequate for existing
commerce.
   Operations and"results during fiscal year.-None. Expenditures
were $36.93.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1923 at a saving of $276,658 under the estimated cost. The
entrance to Chicago River has been improved by the construction of
parallel entrance piers and dredging a channel 190 to 470 feet in
width to a depth of 21 feet below datum. The northerly arm of the
inner breakwater (timber completed in 1874; concrete superstructure
completed in 1934) is in good condition. The southerly arm (timber,
2,500 feet, completed in 1880; concrete superstructure completed in
1930) is in good condition. The exterior breakwater (timber, 5,413
feet, completed in 1889; concrete superstructure completed in 1930)
is in good condition, but some crib-filling stone and riprap stone
probably will be required. The southerly extension (rubble mound,
2,270 feet, completed in 1917) and the south arm (rubble mound,
1,500 feet, completed in 1920; and concrete caisson 1,188 feet with 42
feet of rubble mound connection completed in 1923) have undergone
deterioration to some extent in the rubble-mound portions where
some additional stone is required below water. The north pier (con-
crete superstructure, 975 feet, completed in 1908) is in good condi-
tion. The controlling depth is 21 feet, based upon soundings taken
in March 1936 and June 1937, which are referred to low-water datum.
The mean water level in June 1937 was 0.10 foot above datum.
   The total cost was $5,205,658.21, of which $3,409,844.22 was for new
work and $1,795,813.99 for maintenance. Total expenditures were
$5,205,658.21.
   Proposed operations.-The balance unexpended together with an
allotment of $20,000 made in July will be applied to repairing and
riprapping breakwaters, by contract in fall of 1937 or spring of 1938.
   The sum of $25,000 can be profitably expended in the fiscal year
1939 for repairing and riprapping breakwaters, by contract, in July
and August 1938.
                             Cost and financial summary

                                                                    --
Cost of new work to June 30, 1937________________-------------________ $3, 855, 849. 22
Cost of maintenance to June 30, 1937_________________________ 1, 795, 813. 99
       Total cost of permanent work to June 30, 1937-_________-          5, 651, 663. 21

Net total expenditures  ________---  ____------                  5, 651, 663. 21
Unexpended balance June 30, 1937_- -- _-       111111111_-__11--1         87.47

       Total amount appropriated to June 30, 1937-_________-             5, 651, 750. 68
1268           REPORT OF CHIEF OF ENGINEERS, tf. 8~:ARMY, 1937


   Fiscal year ending June 30                 1933             1934            1935              1936              1937

Cost of new work--------------                        1      ----
                                                           ----  -
                                                                3--             , .         ------.                  ----
Cost of maintenance-----------              119, 565. 16    $194, 195.32   $168,547.64-------------............----------
Total expended....----------------          122, 434. 19     147, 815.38     73, 077. 42    -$14, 907. 88              $36.93
Allotted...........---------------------    228, 721. 00     214, 268.94   -117, 890. 07 ---------------          26,200. 00


Balance unexpended July 1, 1936 .---.-------...-    _____ -___ $26, 324. 40
Deductions on account of revocation of allotment _______--------26, 200. 00

      Net amount to be accounted for .. ______-      -                                     -__- -                  124. 40
Gross amount expended____-___-__-______________                                               $89.13
Less reimbursements collected ___-__
                                  --            ----- __                                    _ 52.20
                                                                                                                     36. 93

   Balance unexpended June 30, 1937 ---------------------------        87. 47
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937, covered by uncompleted contracts-------- 20, 000. 00

Balance available for fiscal year 1938              ________--------------------------                        20, 087. 47
Amount that can be profitably expended in fiscal year ending June
                             - - - -- - - - - - - - -
30, 1939, for maintenance _                          __   _        __         _____                          25, 000. 00
   x Exclusive of available funds.

                                           3. CHICAGO RIVER, ILL.

  Location.-Cook and Lake Counties, Ill., the navigable portions
being wholly in Cook County and the city of Chicago. (See U. S.
Lake Survey Chart No. 752.) For description see page 1467 of
Annual Report for 1932.
  Previous projects.-Adopted by the River and Harbor Act of
June 3, 1896, modified by acts of March 3, 1899, June 13, 1902, and
March 2, 1907, and superseded by act of March 2, 1919. The cost and
expenditures prior to adoption of the existing project (act of Mar. 2,
1907) were $955,885.87 for new work and $109,462.55 for maintenance,
a total of $1,065,348.42. For further details see page 1942 of Annual
Report for 1915.
  Existing project.--This provides for maintenance dredging to 21
feet below the hydraulic grade line, corresponding to low-water
datum in Lake Michigan, of the main river from Rush Street to the
junction of the North and South Branches (0.7 mile), the North
Branch from the junction to North Avenue (2.22 miles), the North
Branch Canal (1.04 miles), and the North Branch Turning Basin,
the channels and turning basin to be maintained to project depth to
within 20 feet of existing docks. The width of channel in main river
varies from 200 to 300 feet, in North Branch from 50 to 150 feet, and
in the North Branch Canal from 70 to 110 feet.
  All depths are referred to low-water datum 1 for Lake Michigan,
with due allowance for hydraulic grade resulting from the drainage
canal.
  The estimate of cost for new work, made in 1899, was $810,600,
exclusive of amount expended on previous project. The latest (1928)
approved estimate of annual cost of maintenance is $20,000.
   1   See report Chicago Harbor for elevation of datum.
         RIVERS AND HARBORS--CHICAGO, ILL., DISTRICT              1269
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for the present
channel depth; the act of March 2, 1907, was interpreted by the
Chief of Engineers on April 11, 1908, as adopting the new work of
the then existing project (H. Doc. No. 95, 56th Cong., 1st sess.) ; and
the act of March 2, 1919, which eliminated all work except mainte-
nance of those portions described (H. Doc. No. 1294, 64th Cong., 1st
sess.). The latest published map is in the Annual Report for 1914,
opposite page 2928.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Iun the Chicago River and its branches there
is a total wharfage, including numerous slips, of about 150,000 feet,
about 15,000 feet of which is used by private interests for shipping
purposes. These terminals are owned and operated by steamboat
lines, grain, coal, and lumber companies, and various other industries.
They are more than adequate in extent for existing commerce.
Except for the State of Illinois barge terminal and elevator at Damen
Avenue on the South Branch (mentioned in terminal facilities on the.
Illinois River), there are no publicly owned docks, wharves, or other
terminal facilities on the main river or its branches.
   Operations and results during fiscal year.-A total of 192,464 cubic
yards of material (scow measurement) was removed from the Chi-
cago River, North Branch, and North Branch Canal, and North
Branch Turning Basin by contract, at a cost of $94,096.56. Prelim-
inary work in connection with dredging was carried on at a cost of
$77.16. The total cost was $94,173.72, all maintenance. Total ex-
penditures were $96,465.23.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1914 at a saving of $265,921 under the estimated cost. The
controlling depths are as follows: In the main river, 21 feet; in
the North Branch up to a point 200 feet south of Blackhawk Street,
21 feet; thence to the North Branch Turning Basin, 20 feet; in the
North Branch Canal, 21 feet to Division Street, thence 20.1 feet to the
turning basin. Depths in the turning basin are 21 feet, except in
the westerly portion thereof where the depth is 20 feet. Depths are
based upon soundings taken in May and June 1937 and are referred
to low-water datum. The mean water level in June 1937 was 0.16
foot above datum. The heads of navigation for commercial vessels
are Belmont Avenue on the North Branch and Ashland Avenue on
the South Branch, 5.85 and 6.63 miles, respectively, from the Michigan
Avenue Bridge.
    The total cost was $1,381,891.38, of which $544,678.70 was for new
work and $837,212.68 for maintenance. Total expenditures were
$1,381,891.38.
    Proposed operations.-The balance unexpended together with an
allotment of $60,000 made in July, will be applied to dredging the
River, North Branch, North Branch Canal and turning basin, by
contract, during May 1938.
    Additional dredging will be necessary to maintain project depth
in the river. The additional sum of $60,000 can be profitably ex-
pended during the fiscal year 1939 for this purpose, the work to be
performed by contract in the spring of 1939.
1270          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                         Cost and financial summary
Cost of new work to June 30, 1937------------------------                                               $1, 500, 564. 57
Cost of maintenance to June 30, 1937 _______________________                                                946, 675. 23
         Total cost of permanent work to June 30, 1937                                                    2, 447, 239. 80
Net total expenditures-----------------------------------                                                2, 447, 239.80
Unexpended balance June 30, 1937______________       _                                                            80.22
         Total amount apropriated to June 30, 1937__
                                                  ---                                     _____-2, 447, 320. 02

         Fiscal year ending June 30                     1933            1934           1935           1936              1937


Cost of new work-.....-.---                                                                                         -
Cost of maintenance.--------------------                $227. 48     $14, 982. 40   $72, 950. 44    $2, 296.39     $94, 173. 72
Total expended...         .....   .........-----------------------
                                                          178. 04     14, 998. 97    72, 983. 31         4.88       96, 465. 23
Allotted___    --------------------------------------                 92,954.44       4, 700. 00   105, 000.00    -24,200.00

Balance unexpended July 1, 1936___________
                                 -------         _$120,                                                              745. 45
Deductions on account of revocation of allotment____---------------                                              24, 200. 00

      Net amount to be accounted for_---__- ________     __-- -                                                  96, 545. 45
Gross amount expended_______________     _______   $96, 532. 16
Less:
    Reimbursements collected----------------------       66. 93
                                                                                                                 96, 465. 23

     Balance unexpended June 30, 1937 ___________-_____-_-                                                              80. 22
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------------------------                                                      60, 00. 00

     Balance available for fiscal year 1938 _______--______----                                                  60, 080. 22
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1__________________________                                                      60,000. 00
    Exclusive of available funds.
                4. CALUMET HARBOR AND RIVER, ILL. AND IND.
  Location.-NortheasternIllinois (Cook County), near the southern
end of Lake Michigan, 121/2 miles south of Chicago Harbor, and
known on the Great Lakes as South Chicago Harbor, it being in the
southerly part of and within the corporate limits of the city of Chi-
cago, except for a part of the breakwaters and of the anchorage be-
hind same, which are in Indiana. The Calumet River is within the
Chicago city limits. (See U. S. Lake Survey Chart No. 755.) For
description see page 1471 of Annual Report for 1932.
  Previous projects.--The original project for Calumet Harbor was
adopted by River and Harbor Act of July 11, 1870, and modified
August 11, 1888. Work was continued under these projects until
1896, the total cost and expenditures being $454,484.53.
  The original project for Calumet River was adopted by River
and Habor Act of July 5, 1884, and modified August 5, 1886. The
cost and expenditures under this original and modified project were
$446,718.98, of which $401,488.50 was for new work and $45,230.48
for maintenance. (For further details see p. 1943 of Annual Report
for 1915.)
  Existing project.--This provides for the following work:
  (a) An outer harbor protected by two breakwaters, one (timber cribs)
extending from the shore due east of 4,400 feet, thence southeasterly 2,500 feet;
and the other a detached breakwater extending about 5,000 feet southeasterly
with an entrance 600 feet wide between the breakwaters.
            RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                          1271
   (b) Dredging the outer harbor area to, a depth of 26 feet 1 with a minimum
width of 3,000 feet.
   (c) An entrance channel to the river 26 feet deep ' between existing bulk-
heads to the Elgin, Joliet & Eastern Railway Co. bridge near the original shore
line.
   (d) A channel in Calumet River, thence to The Forks, with a minimum width
of 200 feet and with a depth of 25 feet to the Semet Solvay wharf, near One
Hundred and Eleventh Street; a depth of 23 feet through the rock section in
the vicinity of One Hundred and Eleventh and One Hundred and Fourteenth
Streets, thence a depth of 21 feet to One Hundred and Twenty-second Street,
and thence a depth of 21.5 feet to the head of the improvement.
   (e) Widening and straightening the river channel, except through the rock
cut, to lines 20 feet from the bulkhead lines now or hereafter established.
   (f) Five turning basins at intervals along the channel, of suitable size for
turning the largest lake cargo carriers, and each of the same depth as the,
adjacent channel.
   Fluctuations in stage of the river are practically those resulting
from changes of water level in Lake Michigan. On Lake Michigan
seasonal fluctuations in mean stage from low water in winter to high
water in summer average about 1.2 feet. Local and temporary fluc-
tuations of 0.1 to 0.5 foot, due to wind and difference in barometric-
pressures occur daily. Seiches of 3 to 4 feet occur at infrequent
intervals.
   The estimate of cost for new work, revised in 1935, is $8,503,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate of annual cost of maintenance is $125,000.
   The existing project was adopted by the following river and harbor
acts: The act of March 3, 1899 (Annual Report for 1896, pp. 2584, et
seq., and H. Doc. No. 277, 54th Cong., 1st sess.), and amended by
the Secretary of War on July 11, 1902, under authority of the act of
June 13, 1902.
   The act of March 3, 1905, provided for the five turning basins (H.
Doc. No. 172, 58th Cong., 2d sess.). The act of June 25, 1910, pro-
vided for a 20-foot depth from One Hundred and Twenty-second
Street to The Forks with turning basin (H. Doc. No. 349, 60th Cong.,
1st sess.); widening the outer end of entrance channel was authorized
by act of March 2, 1919 (H. Doc. No. 237, 63d Cong., 1st sess.).
   The act of September 22, 1922, consolidated the two projects for
Calumet Harbor and Calumet River to form a single project for
Calumet Harbor and Calumet River, Ill. and Ind.
   The act of August 30, 1935, authorized the construction of the de-
tached breakwater, dredging of the outer harbor to 26 feet, deepening
the entrance channel to 26 feet, the deepening of the Calumet River
channel to 25 feet up to the Semet Solvay wharf; to 23 feet through
the rock section in the vicinity of One Hundred and Eleventh and
One Hundred and Fourteenth Streets; to 21 feet to One Hundred
and Twenty-second Street; and to 21.5 feet to the head of the im-
provement; the widening and straightening of the Calumet River
channel except through the rock cut, to 20 feet from the bulkhead
lines now or hereafter established, and the deepening of the five turn-
ing basins to the same depth as the adjacent channel (H. Doc. No.
494, 72d Cong., 2d sess.). The breakwater construction was author-
ized September 6, 1933, and the outer harbor dredging was authorized
on December 16, 1933, by the Public Works Administration prior to
  1 Low-water datum for Lake Michigan (see report Chicago Harbor), to which all depths
at this harbor are referred.
1272    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

inclusion in the River and Harbor Act of 1935. The latest published
maps appear in House Document No. 494, Seventy-second Congress,
second session.
   Local cooperation.-The act of March 3, 1905, required as a condi-
tion precedent to Federal expenditures upon any one of the five turn-
ing basins the donation to the United States of the land necessary
for that turning basin and have either provided any necessary bulk-
heads or have released the United States from all damage to adjacent
lands by reason of the excavation. As a result, the land needed for
turning basins nos. 1, 3, and 5 has been conveyed to the United States.
The total area thus conveyed is 17.85 acres, and the value of the land
at the time of its conveyance was approximately $35,700.
   The act of August 30, 1935, provided that the widening of the
channel at any locality or the future excavation of a turning basin
shall not be commenced until local interests have furnished, free of
cost to the United States, the lands or easements necessary for such
widening or excavation and have either provided any necessary bulk-
heads, or have released the United States from all damages to adjacent
lands by reason of the excavation.
   Terminal facilities.-All terminal facilities on the lake front and
in the entrance channel up to the Elgin, Joliet & Eastern Railway
bridge are owned and operated by two steel companies, except a 450-
linear-foot reservation owned by the Engineer Department.
   These facilities consist in part of two slips which are 2,900 and
1,300 feet long, respectively, and also of about 2,961 feet of wharfage
facing on the entrance channel. These terminals are fully equipped
and are considered adequate for existing commerce. Additional dock-
age exists on the lake front and along the entrance channel, but for
various reasons it is not now suitable for terminal uses.
   Between the Elgin, Joliet & Eastern Railway bridge and The Forks
there are about 45,800 feet of wharfage, including 14 slips and dry-
docks, of which about 31,300 feet are in use. These wharves are
owned and operated by various private and industrial concerns han-
dling ore, coal, grain, lumber, etc. About 3,600 feet are in use for
shipbuilding purposes. The ore, grain, and coal wharves are fully
equipped and are considered adequate for existing commerce. There
are no public wharves on the Calumet River.
   Operations and results during fiscal year--Regular fu'nds-New
zoork.-A total of 966,268 cubic yards of material (place measure-
ment) was removed from sections 3A and 4A in the outer harbor,
by contract, at a cost of $489,682.05. Preliminary work in connec-
tion with dredging the outer harbor cost $1,081.56.
   Maintenance.-A total of 148,348 cubic yards of material (scow
measurement) was dredged in the river by contract at a cost of $79,-
144.80. Previously reported preliminary costs were reduced by
$129.94. Channel obstructions were removed in the river by contract
at a cost of $632.15. Shoals (8,878 cubic yards, scow measurement)
were removed in approach to the harbor by the U. S. dredge Tomp-
kins at a cost of $20,934.65.
   The total cost was $591,345.27, of which $490,763.61 was for new
work and $100,581.66 for maintenance. Total expenditures were
$506,985.05.
           RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                          1273
    Public Works funds.-No work was performed. Total expendi-
tures were $1,285.28, applied to accounts payable for the preceding
fiscal year.
    Conditionat end of fiscal year.-The existing project is 64.6 percent
complete. The work remaining to be done to complete the project is
the construction of turning basins nos. 2 and 4, dredging portions of
the outer harbor, and deepening, widening, and straightening the
Calumet River. The timber breakwater (completed in 1904; concrete
superstructure completed in 1924) is in good condition. The cellular-
type, steel-sheet-pile breakwater (completed in 1935) is in good condi-
tion. Under permit from the Secretary of War the Youngstown
Sheet & Tube Co. and its predecessors have removed all the south pier
 (completed in 1897) and rebuilt the frontage with a concrete dock
wall 2,961 feet in length. The controlling depth in the entrance
channel is greater than the project depth of 26 feet. The controlling
depth in the river is about 21 feet up to the rock section, thence 20.3
feet up to the plant of the General Chemical Co., about 4.2 miles above
the Elgin, Joliet & Eastern Railway bridge, thence about 18 feet to
turning basin no. 5, at the upper end of the project. Depths in turn-
ing basin no. 5 are more than 18 feet, except in the westerly portion
where depths vary from 14 to 17 feet. Depths are based on soundings
taken in April and May 1937. The mean water level in June 1937
:was 0.10 foot above datum. The head of navigation for deep draft
vessels is at the forks, the present limit of Government improvement
for lake vessels. Dredging in the outer harbor has produced the
project depth of 26 feet over an area of about 533 acres. The work
is about 68 percent complete. Depths in the portions to be dredged
vary from 2.0 to 27.0 feet.
    The costs and expenditures on the existing project have been as
follows :
    Regular funds.-The total cost was $4,376,823.52, of which $2,443,-
396.98 was for new work and $1,933,426.54 for maintenance. Total
expenditures were $4,284,087.49.
    Public Works funds.-The total cost and expenditure was $3,036,-
603.05, all for new work.
    The grand total cost, all funds, was $7,413,426.57, of which $5,480,-
000.03 was for new work and $1,933,426.54 for maintenance. Total
expenditures were $7,320,690.54.
    Proposedoperations. The balance unexpended, together with allot-
ments of $740,000 made during July 1937, will be applied as follows:
                       MAINTENANCE AND IMPROVEMENT FUNDS

Accounts payable, June 30, 1937--------        _______________________ $92, 736. 03
New work:
    Complete dredging sections 3 A and 4 A, in outer
       harbor, under existing contract, August 1937.... $115, 234. 66
    Dredging outer harbor in front of Carnegie-Illinois
       Steel Co. by contract, June 1938 to November
       1939-----------------------------------              440, 000. 00
                                                                         555, 234. 66
Maintenance: Dredging river from 92d Street to Lake Calumet
  entrance, by contract, August 1937 to May 1938----------------         300,000. 00
       Total    ---------------------------------------------            947, 970. 69
1274          REPORT OF CHIEF OF ENGINEEIS, U. S. ARMY, 1937

  Dredging to maintain project depth in the 'river and turning
basins will be necessary. The additional sum of $90,000 can be
profitably expended during the fiscal year 1939 for this purpose,
the work to be performed by contract in the spring of 1939.
                                      Cost and financial summary
                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937-------------                                                 $3, 299, 370. 01
Cost of maintenance to June 30, 1937---------------                                -------      1, 978, 657. 02

     Total cost of permanent work to June 30, 1937______ ____                                   5, 278, 027. 03
Minus accounts payable June 30, 1937_ __________-___--------                                        92, 736. 03

     Net total expenditures-----------------------------5, 185, 291. 00
Unexpended balance June 30, 1937-------------------------  207, 970. 69

          Total amount appropriated to June 30, 1937________---5, 393,261. 69

         Fiscal year ending June 30                 1933         1934        1935            1936           1937


Cost of new work _____________ -- --__ ---------..........                              $5, 325. 30     $490, 763. 61
Cost of maintenance ._______________...... $62,276.63 - -81,                                803.84       100, 581.66
       Total cost               ...... 62, 276.63 ___----__-
                    ____.......____                                        -____        87,129.14         591, 345.27
Total expended......_______.___-___-......      62,276. 63   _             $1,444.68     77, 308. 65      506, 985. 05

Allotted------......-----.___     ___ .-   .   45,514. 77     $19,300.00   40, 500.00   752, 000. 00     -29,000. 00


Balance unexpended July 1, 1936 __________---                                                       $743, 955. 74
Deductions on account of revocation of allotment--------- ----                                         29,000. 00

      Net amount to be accounted for    ----                                                         714, 955. 74
Gross amount expended_________________________                             $509, 310.59
Less reimbursements collected-._ --------                                      2, 325. 54
                                                                                                     506, 985. 05

     Balance unexpended June 30, 1937-------------                              --------             207, 970. 69
Amount covered by uncompleted contradts2__-----                                                      206, 467. 19
     Balance available June 30, 1937----------------------   --                                         1,503. 50
Amount allotted from War Department Civil Appropriations Act
approved July 19, 1937----------------------------------                                            740, 000. 00
Balance available for fiscal year 1938                     ------------------------                  741, 503. 50
Amount (estimated) required to be appropriated for completion
  of existing        project 1_-----________                                                    2, 625, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939 for maintenance --__________________---                                                 90, 000. 00
  1   Exclusive of available funds.

                                           PUBLIC    WORKS       FUNDS

Cost of new work to June 30, 1937____________________________ $3, 036, 603. 05
Cost of maintenance to June 30, 1937___________________       _-------------

       Total cost of permanent work to June 30, 1937--______ _ 3, 036, 603.05
Net total expenditures---------------     ------------------    3, 036, 603. 05
Total amount appropriated to June 30, 1937 .-.     -----      -____
                                                                3, 036, 603. 05
                  RIVERS AND HARBORS--CHICAGO, ILL., DISTRICT                                                                      1275

    Fiscal year ending June 30                      1933                   1934               1935              1936              1937


                      .......-----..----------.......
Cost of new work------....--                                           $460,163. 85 $1,414, 334.34 $1, 162, 104. 86 -----------
Cost of maintenance----------.------------___-----------                                ----------------- ----------------- --------
Total expended....               _____-------------------------         393, 088. 18       985, 697.75     1,656, 531. 84         $1, 285.28
Allotted...----- ---------               -------         -----        3,058,700. 00        493,138.98      -499, 214. 30        -16, 021. 63


Balance unexpended July 1, 1936---    ----------   -----------                                                               $17, 306. 91
Deductions on account of revocation of allotment ---------------                                                              16, 021. 63

      Net amount to be accounted for-----------------------                                                                     1, 285.28
Gross amount expended_     __- - -____-
                                      -    __-_____- $1,287.03
Less reimbursements collected--------------------         1. 75
                                                                                                                                1, 285. 28

    CONSOLIDATED          COST AND FINANCIAL SUMMARY FOR CALUMET HARBOR AND RIVER

Cost of new work to June 30, 1937-------------------------                                                             $6, 335, 973. 06
Cost of maintenance to June 30, 1937----------                                                                             978, 657. 02
                                                                                                                        1--------------_
                                                                                                                        1,

      Total cost of permanent work to June 30, 1937 _____.                                                              8, 314, 630. 08
Minus accounts payable June 30, 1937 ------------------------                                                           -92,    736. 03
     Net total expenditures_---_-_..... ----      ________                                                              8, 221, 894. 05
Unexpended balance June 30, 1937----------------------------                                                               207, 970. 69
          Total amount appropriated to June 30, 1937__---                                                     __        8, 429, 864. 74

    Fiscal year ending June 30                       1933                  1934               1935              1936              1937


Cost of new work                          .........................    $460, 163. 85 $1,414, 334. 34 $1, 167, 430. 16           $490, 763. 61
Cost of maintenance ------------                   $62, 276. 63                  .            ..          81, 803. 84            100, 581. 66
       Total cost-.....                 --......... 62, 276. 63         460, 163. 85     1, 414, 334. 34   1, 249, 234. 00       591, 345. 27
Total expended-_--.----------_                     62, 276. 63          393, 088. 18       987, 142. 43    1, 733, 840. 49       508, 270. 33
Allotted....                                         45, 514. 77
                          .......----------------------               3, 078, 000. 00      533, 638. 98      252, 785. 70       -45, 021. 63


Balance unexpended July 1, 1936_______________________________                                                               $761, 262. 65
Deductions on account of revocations of allotment_____                                                                         45, 021. 63
      Net amount to be accounted for _________                                                                                716, 241.02
Gross amount expended____________-______________ $510, 597.62
Less reimbursements collected ____________________  2, 327. 29
                                                                                                                              508, 270. 33
          Balance unexpended June 30, 1937_______________________                                                             207, 970. 69
Amount covered by uncompleted contracts_____________________                                                                  206, 467. 19
     Balance available June 30, 1937______________________                                                                      1, 503. 50
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 _   ____                                                                                              740, 000. 00
Balance available for fiscal year 1938--------------------------                                    741, 503. 50
Amount (estimated) required to be appropriated for completion
  of existing project                                                                               625, 000. 00
                                                                                          _----------------------------------------2
Amount that can be profitably- - expended          in fiscal year ending June
                                 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - -
  30, 1939, for maintenance                                                                           90, 000. 00
    1 Exclusive of available funds.
1276     REPORT OF CHIEF OF ENGINEERS,         t.   S. ARMY, 1937

                        5. LAKE CALUMET, ILL.

    Location.-NortheasternIllinois (Cook County), within the south-
easterly limits of the city of Chicago, just west of and connected by
a short channel with turning basin No. 5, the landward limit of the
project known as Calumet Harbor and River. ;(See U. S. Lake Sur-
vey Chart No. 751.)
   Existing project.- This provides for dredging areas A and B in the
south end of Lake Calumet, including an entrance channel 300 feet in
width from turning basin No. 5 to a depth of 21 feet.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York.
    Fluctuations in stage of the lake are practically those resulting
from changes of water level in Lake Michigan. On Lake Michigan
seasonal fluctuations in mean stage from low water in winter to high
water in summer average about 1.2 feet. Local and temporary fluctu-
ations of 0.1 to 0.5 foot, due to wind and difference in barometric pres-
sures, occur daily. Seiches of 3 to 4 feet occur at infrequent intervals.
   The estimate of cost for new work, made in 1933, is $460,500. The
estimated annual cost of maintenance is $10,000.
   The existing project was authorized by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 180, ;73d Cong., 2d sess.). Areas A
and B are shown on the maps included in the project document,
which document contains the latest published maps of the Illinois
waterway.
   Local cooperation.-The act of August 30, 1935, provided that local
interests should furnish to the United States, free of cost, all lands
and easements necessary for the execution of the project, and that
no dredging shall be done in Lake Calumet until local interests have
furnished evidence satisfactory to the Secretary of War that they
will construct and operate terminal facilities thereon.
   The United States has accepted easements from the city of Chicago
for lands necessary for dredging in Lake Calumet.
   The city has provided by ordinance for the construction of a satis-
factory lake and river transfer terminal at the southern end of the
lake.
   Terminal facilities.-There are no facilities at the present time.
The proposed terminal development will have adequate facilities for
operation of a satisfactory lake-river transfer terminal.
   Operations and results during fiscal year.-Preliminary work in
connection with proposed dredging was carried on at a cost of
$1,026.85. A total of 993,209 cubic yards of material (place meas-
urement) was removed by contract at a cost of $189,379.64. The work
is 42.4 percent complete.
   The total cost was $190,406.49, all new work. The expenditures
were $130,086.43.
   Condition at end of fiscal year.-The existing project is 42.4 per-
cent complete. Dredging in Lake Calumet has produced project
depth of 21 feet over an area of approximately 1,160,000 square feet.
Except in the dredged areas, the depths in Lake Calumet vary from
1 to 10 feet, but in general are so shallow that no navigation is pos-
sible in its undredged portions except by very shallow-draft vessels.
   The total co'st was $195,712.23, all new work. Total expenditures
were $130,086.43.
              RIVERS AND HARBORS--CHICAGO, ILL., DISTRICT                                                     1277

   Proposed operations.--The balance unexpended will be applied as
follows :
                           MAINTENANCE         AND      IMPROVEMENT         FUNDS

Accounts payable June 30, 1937--------------------------------      $86,636.42
New work: Complete dredging portion of Lake Calumet to 21-foot
  depth, under existing contract, about Dec. 1, 1937__------------- 233, 781. 63

         Total--------------------------------------------------                                        320, 418. 05
  No additional funds will be required for the fiscal year 1939, as
the funds on hand are sufficient to complete the project, and it is not
expected that maintenance dredging will be necessary.
                                  Cost and financial summary

Cost of new work to June 30, 1937-----------------------------$195,712. 23
Cost of maintenance to June 30, 1937     _____

        Total cost of permanent work to June 30, 1937________---                                         195,712. 23
Undistributed costs June 30, 1937______-----____-____                                    _____           21, 006. 14

      Net total cost to June 30, 1937L.... ____--_----------                                          216, 718. 37
Plus accounts receivable June 30, 1937_ ___--------------------                                              4. 48

        Gross total costs to June 30, 1937_____________ _________                                     216, 722. 85
Minus accounts payable June 30, 1937______________________                                               86, 636.42

     Net total expenditures---------------------------------- 130, 086. 43
                               ----
Unexpended balance June 30, 1937_______________      __-____ 320, 413.57
        Total amount appropriated to June 30, 1937__--------------                                    450, 500. 00

        Fiscal year ending June 30               1933          1934          1935              1936           1937


Cost of new work _________________________   _____   ___                                   $5, 305. 74    $190, 406.49
Cost ofmaintenance_-
Total expended _-.-...-                      ....                     -.............            ...         130, 086.43

Allotted___     ------------------       ------------------                    -          460,500. 00      -10,000. 00


Balance unexpended July 1, 1936                                $460, 500. 00
Deductions on account of revocation of allotment_--------------10, 000. 00
        Net amount to be accounted for------------------____                                          450, 500. 00
Gross    amount      expended_--------                                         --         --          130, 086. 43

      Balance unexpended June 30, 1937__                                 _____________                320, 413. 57
Outstanding liabilities June 30, 1937 ----------------                        $14, 472. 03
Amount covered by uncompleted contracts                       -----------    303, 728. 75
                                                                                                      318, 200.78
     Balance available June 30, 1937_-------------------       _    2,212. 79
Accounts receivable June 30, 1937___
                                  .        -
                                     - ________-- - -    -- ____ --     4. 48
        Unobligated balance available June 30, 1937                                 --                    2,217. 27

                                 6. INDIANA HARBOR, IND.

  Location.-Northwestern Indiana (Lake County), on southwest
shore of Lake Michigan, 18 miles southeast of Chicago Harbor. (See
U. S. Lake Survey Chart No. 755.)
  Previous project.-Adopted by River and Harbor Act of June 25,
1910. Cost and expenditures: For new work, $60,667.41; for main-
1278     REPORT OF CHIEF OF ENGINEIRS,:J            .   ,8;'ARMY,1937

tenance, $2,509.54; total, $63,176.95. For further details see page
1943 of Annual Report for 1915.
  Existing project.-This provides for-
   (a) A northerly rubble-mound breakwater, 2,520 feet long, an easterly rein-
forced concrete-caisson breakwater 1,507 feet long, an extension of this lattet
breakwater about 2,300 feet to the north, and the construction and placing of
a lighthouse crib.
   (b) An entrance channel generally 800 feet wide, with a depth of 28 feet at
the outer end and 26 feet at the inner end.
   (c) Dredging the anchorage and maneuver basin in the outer harbor to a
depth of 26 feet, and the channel between the bulkheaded fills in the outer har-
bor to a depth of 25 feet.
   (d) Widening the main stem of the Indiana Harbor Canal to a bottom width
-of 260 feet with a depth of 22 feet from the outer harbor to the forks, and
-dredging the Calumet River Branch from the forks to One Hundred and Forty-
first Street to the same width and depth.
   (e) A channel 22 feet deep and 160 feet wide in the Lake George Branch
from the forks to White Oak Avenue.
   (f) The maintenance of a channel 20 feet deep and 80 feet wide in the
remainder of the Calumet River Branch south of the north line of One Hun-
dred and Forty-first Street, except the removal of sewage deposits and other
city refuse, after completion and acceptance from private parties.
   (g) The construction of a turning basin at the forks, 22 feet deep.
    That part of the Calumet River Branch Channel from the north
line of One Hundred and Forty-first Street to the Grand Calumet
River has not as yet been completed by local interests or accepted for
:maintenance by the United States.
    The project depths are referred to low-water datum for Lake
Michigan, which is 578.5 feet above mean tide at New York.
    Seasonal fluctuations in mean stage from low water in winter to
high water in summer average about 1.2 feet. Local and temporary
fluctuations of 0.1 to 0.5 foot, due to wind and difference in baro-
metric pressures, occur daily. Seiches of 3 to 4 feet occur at infre-
iquent  intervals.
    The estimate of cost for new work, revised in 1935, is $4,316,000,
exclusive of amount expended on previous project. The latest (1935)
approved estimate for annual cost of maintenance is $53,000.
    The existing project was authorized by the following river and
harbors acts: The act of June 25, 1910, provided for the outer
harbor and the maintenance of the inner harbor channel (H. Doc.
No. 1113, 60th Cong., 2d sess.); act of March 4, 1913, originally pro-
vided for the breakwaters (H. Doc. No. 690, 62d Cong., 2d sess.) ;
act of March 2, 1919, provided for the lighthouse crib, and for the
present length and alinement of the easterly and northerly break-
waters (Rivers and Harbors Committee Doc. No. 6, 65th Cong., 2d
sess.) ; act of March 20, 1922, modified the length of channel to be
maintained in extension to Lake George (Public, No. 176, 67th
Cong.), and the act of July 3, 1930, provided for the turning basin
at the forks (Rivers and Harbors Committee Doc. No. 21. 71st
Cong., 2d sess.).
    The act of August 30, 1935, authorized the construction of the
extension to the easterly breakwater, dredging the entrance channel
and outer harbor, deepening the channel between the bulkheaded
fills, and widening the main stem of the canal and the portion of the
Calumet River Branch up to the north line of One Hundred and
Forty-first Street. (Rivers and Harbors Committee Doc. No. 29,
72d Cong., 1st sess.) The extension of the outer breakwater was
         RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT              1279
authorized September 6, 1933, and dredging the outer harbor and
entrance channel was authorized July 25, 1934, by the Public Works
Administration prior to inclusion in the River and Harbor Act of
1935.
    The River and Harbor Act of March 3, 1925, authorized the Sec-
retary of War to modify the project so far as relates to length and
alinement of breakwaters and to sell to the Youngstown Sheet &
Tube Co. approximately 1,180 linear feet of the shoreward end of
the existing north breakwater for the sum of $90,000, and apply
this sum to the extension of the east breakwater. The sale was con-
summated and the amount credited to the appropriation September
20, 1925.
    The act of June 30, 1932 (Public, No. 219, 72d Cong.), authorized
the Secretary of War to sell to the Inland Steel Co. approximately
1,903 feet of the southerly end of the existing east breakwater, sub-
ject to such conditions and limitations as he may impose to insure
proper maintenance of the breakwater and to protect the interests
of navigation, for the sum of $114,180, and pay the proceeds into
the United States Treasury. The sale was consummated and quit-
claim deed was given the Inland Steel Co. on December 27, 1933.
    The act of August 26, 1937, modified the conditions of local co-
operation required before enlargement of the Indiana Harbor Canal
is undertaken by the United States (Rivers and Harbors Committee
Document, No. 13, 75th Cong., 1st sess.). The latest published map is
in the last-mentioned document.
    Local cooperation.-The act of August 26, 1937, provides that the
enlargement of the Indiana Harbor Canal shall not be undertaken
until local interests have furnished a right-of-way 300 feet wide
and have constructed substantial bulkheads along the channel on
the established lines shown on the map accompanying Rivers and
Harbors Committee Document, No. 13, Seventy-fifth Congress, first
session, provided that the improvement on one side may proceed in
any section on fulfillment of the conditions for that side of the sec-
tion, and provided further, that south of the turning basin at the
forks (beginning 450 feet south of the intersection of the present
Calumet Branch and main stem bulkhead lines) widening and deep-
ening by the United States shall be done only as the rights-of-way
and bulkheads on at least one side of the channel are continuously
provided southward from the above limit of the turning basin at
the forks. Prior requirements have been fully complied with.
    Terminal facilities.-There is now in existence about 19,000 feet of
wharfage along the main channel and the extension toward Lake
George. Of this amount, about 11,000 feet along the outer harbor
and the inner harbor channel is being used by steel, oil, manufactur-
ing, and terminal companies. The wharves now in use are fully
equipped and are considered adequate for existing commerce.
    Operations and results during fiscal year--regular funds-new
work.-The cost of preliminary work done in connection with pro-
posed dredging was $353.70. A total of 75,039 cubic yards of mate-
rial (place measurement) was removed from the outer harbor by
contract at a cost of $44,709.53. A total of 35,078 cubic-yards of
material (scow measurement) was removed from the canal by con-
tract at a cost of $17,968.86.
     20196-37-pt. 1----81
1280    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Maintenance.--A total of 163,370 cubic yards of material (scow
measurement) was removed from the entrance harbor and canal, by
contract, at a cost of $83,403.30. Preliminary costs on this work
amounted to $2,179.52.
   The total cost was $148,614.91, of which $63,032.09 was for new
work and $85,582.82 for maintenance. Total expenditures were
$92,111.04.
   Public Works funds.-A total of 450,641 cubic yards of material
 (place measurement) was removed from the outer harbor and en-
trance channel by contract at a cost of $180,013.80. The work is 100
percent complete. Preliminary costs for this work were $4,143.14.
The total cost was $184,156.94, all new work. Total expenditures
were $254,338.19.
   The total cost, all funds, was $332,771.85, of which $247,189.03 was
for new work, and $85,582.82 for maintenance. The total expendi-
tures were $346,449.23.
   Condition at end of fiscal year.-The existing project is 80 percent
complete. The north breakwater (rubble mound, 2,520 feet, com-
pleted in 1922) is in good condition. The east breakwater (concrete
caisson, 1,507 feet, completed in 1926), and northerly extension
 (rubble mound, 2,300 feet, completed in 1935), are in good condition.
The project depths of 25 to 28 feet are available in the entrance to
the outer harbor and channel between the steel companies. The
project depth of 22 feet is available in the canal to the Forks and
in the turning basin at the Forks. In the Calumet River branch
depths vary from 4.6 to 22.0 feet in the section from the turning
basin to a point 550 feet south, and from that point to Ong Hundred
and Forty-first Street from 3 to 5 feet. The depths in the Lake
George branch vary from 20 to 23 feet from the turning basin to
the Forsyth Avenue Bridge and 15 to 22 feet above that point.
Depths in the harbor are based upon soundings taken in May 1936
and depths in the channel between the steel companies and in the
canal are based upon soundings and sweepings taken March to June
1937. Depths are referred to low-water datum. The mean level in
June 1937 was 0.10 foot above datum. The head of navigation for
commercial vessels is at the Baltimore & Ohio Chicago terminal
railroad bridge on the Lake George branch, about 3 miles from the
outer harbor. -
    The work remaining to be done to complete the existing project is
widening the main stem of the Indiana Harbor Canal to a bottom
width of 260 feet, with a depth of 22 feet from the outer harbor to
the Forks, and dredging the Calumet branch from the Forks to One
Hundred and Forty-first Street to the .same width and depth, and
deepening and widening to full project dimensions the upper 3,700
feet of the Lake George branch.
    Dredging in the outer harbor has been completed. Dredging in
the entrance channel and canal has restored project depth over an
area of approximately 484,000 square feet. The work is 74.3 percent
complete.
    Regular funds.-The total cost was $2,387,763.73, of which $1,835,-
  517.12 was for new work and $552,246.61 for maintenance. Total
expenditures were $2,325,030.72.
    Public Works fuands.-The total cost was $1,618,044.49 for new
  work. Total expenditures were $1,618,044.49.
                      RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                                                                         1281
   The grand total cost, all funds, was $4,005,808.22, of which
$3,453,561.61 was for new work and $552,246.61 for maintenance.
The grand total expenditures were $3,943,075.21.
   Proposed operations.-The balance unexpended together with an
allotment of $60,000 made in July will be applied as follows:
                                          MAINTENANCE AND IMPROVEMENT FUNDS

Accounts payable June 30, 1937 ---------------------------------                                                                  $62, 733. 01

Maintenance :
   Complete dredging entrance channel and canal,
      under existing contract, about Aug. 8, 1937---- $38,018.02
   Dredging to maintain project depth, by contract,
     May to June 1938--------------        ------------ 60, 000. 00
                                                                                                                                     98,018. 02

                 Total----------                          ------------------------------------                                    160, 751. 03
   Dredging will be necessary to maintain project depth in the en-
trance channel and the canal. The additional sum of $80,000 can be
profitably expended during the fiscal year 1939 for this purpose,
the work to be performed by contract in the spring of 1939.
                                                     Cost and financial summary
                                          MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937-----------------------                                                                    $1, 896, 184.53
Cost of maintenance to June 30, 1937--------------------------                                                                  554, 756.15
      Total cost of permanent work to June 30, 1937------------                                                                 2, 450, 940. 68
Minus accounts payable June 30, 1937--------------------------                                                                      62, 733. 01
     Net total expenditures--------------------------------                                                                     2, 388, 207. 67
Unexpended balance June 30, 1937---1111111111_-11                                                                           1      100, 751. 03
             Total amount appropriated to June 30, 1937-------------2, 488, 958. 70

             Fiscal year ending June 30                                  1933              1934           1935           1936            1937


Cost of new work---------------------$61,185.63                                        ---------------------           $1,127.00       $63, 032. 09
Cost of maintenance____________        _   42, 283. 93                                 -----------     $80, 660. 34    78, 661.60       85, 582. 82
         Total cost...............----------------------             103, 469. 56 ----------           80, 660. 34     79, 788. 60     148, 614. 91
Total expended.......--------------------------                      103, 469. 56      ------------    80,646. 82      73, 572. 98      92, 111. 04
Allotted ............................----------------------------------. 62, 713. 09    $47, 700. 00   30, 500. 00    261, 500. 00    -13, 900. 00


Balance unexpended July 1, 1936---  ---------------------- $206, 762. 07
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936    -----------------------------------  10, 000. 00
      Amount to be accounted for---------------------------                                                                       216, 762. 07
Deductions on account of revocation of allotment__----------------                                                                 23, 900. 00
      Net amount to be accounted for ---------------------                                                                        192, 862. 07
Gross amount expended------------------------ $98, 337. 86
Less reimbursements collected--------------------   6, 226. 82
                                                                                                                                     92, 111. 04

             Balance unexpended June 30, 1937---___-----                                                                          100, 751. 03
Amount covered by uncompleted contracts---                                                                                        100, 751. 03
1282             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------____________                                                      $60, 000.00
Balance available for fiscal year 1938 __________________________                                                               60, 000. 00
Amount (estimated) required      to be appropriated         for completion of
existing project __- ______                      - -
                                                                    _______                                                    750, 000.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance __________________________________                                                                      80, 000. 00
  1Exclusive of available funds.
                                                      PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937-----------------------------$1,                                                              618, 044. 49
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937                                                 -----------            1, 618, 044. 49
Net total expenditures-________-- _1--_----                                                                                1, 618, 044. 49
Total amount appropriated to June 30, 1937----------1__________                                                            1, 618, 044. 19

           Fiscal year ending June 30                          1933                1934                1935            1936             1937


'Cost of new work-
'Cost of maintenance          .-    _-
                                                        --
                                                      ------
                                                                       -$160, 553. 17
                                                                         --------
                                                                                                   $757, 428. 48 $515, 905. 90 $184, 156. 94
                                                                                                               - ------        -  -    --

                            .
'Total expended... --------------------------------                        122, 860. 77             653, 321. 91   587, 523. 62      254, 338. 19

Allotted-------------...      ----------------------------- 897,000.00                              757,000.00     -35,955. 51             .


Balance unexpended July 1, 1936 ------------------------------                                                               $254, 338. 19
Gross amount expended----------------------                                                                                   254, 338. 19

         CONSOLIDATED              COST AND FINANCIAL                 SUMMARY                 FOR INDIANA           HARBOR,        IND.


Cost of new work to June 30, 1937                                                                                       $3, 514, 229. 02
Cost of maintenance to June 30, 1937------------ -------                                                                   554, 756. 15

            Total cost of permanent work to June 30, 1937 ______                                                           4, 068, 985. 17
Minus accounts payable June 30, 1937_____-----.--.-________-                                                                      62, 733. 01

      Net total expenditures___-------------------                                                                         4, 006, 252. 16
Unexpended balance June 30, 1937_ _------------------------ -                                                                100, 751. 03

            Total amount appropriated to June 30, 1937------                                                       _       4, 107, 003. 19

           Fiscal year ending June 30                          1933                1934                 1935           1936               1937


Cost of new work---------------------                    $61, 185. 63    $160, 553. 17            $757, 428. 48 $517, 032. 90       $247, 189. 03
Cost of maintenance----------------------                 42, 283.93     --        -------    -     80, 660. 34   78, 661. 60         85, 582. 82

        Total cost         --------------------- 103, 469. 56                  160, 553. 17         838 088. 82     595, 694. 50      332, 771. 85

Total expended----------------------03,                        469. 56        122, 860. 77         733, 968. 73    661, 096. 60      346, 449. 23
Allotted .         ----------------------------           62, 713. 09         944, 700. 00         787, 500. 00    225, 544.49      -13, 900. 00


                                  ---------------------------
Balance unexpended July 1, 1936___                                                                                           $461, 100. 26
Amount allotted from War Department Appropriation Act ap-
     proved May 15, 1936_________----------                    --              -                                                   10, 000. 00

       Amount to be accounted for .....                                                                                           471, 100. 26
  Deductions on account of revocation of allotment__                                                                               23, 900. 00

             Net amount to be accounted for-----------_                                                                           447, 200. 26
            RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                     1283
                               -
Gross amount expended_____________________--         $352, 676.05
Less reimbursements collected_ __   ___-______6---      6, 226. 82
                                                                     $346, 449. 23

      Balance unexpended June 30, 1937_ --------------------   _    100, 751.03
Amount covered by uncompleted contracts- -__             ___---100,      751. 03
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 ___.6________________---6----------00, 000. 00
Balance available for fiscal year 1938_--__---------------------     60, 000. 00
Amount (estimated) required to be appropriated for completion
  of existing project 1___-__--------------                         750, 000. 00
Amount that can be profitably expended      in fiscal year ending
                                      1
June 30, 1939, for maintenance ___________---_---__---              80, 000. 00
  1Exclusive of available funds.

                       7. MICHIGAN CITY HARBOR, IND.

   Location.-Northwestern Indiana (in La Porte County), on the
southeasterly shore of Lake Michigan, 38 miles in a southeasterly
direction from Chicago Harbor. (See U. S. Lake Survey Chart No.
75.) For description see page 1482 of Annual Report for 1932.
   Previous projects.-Adopted by River and Harbor Act of July 4,
1836, and work was continued under this project until 1870. Total
cost and expenditure was $287,388.97. For further details see page
1944 of Annual Report for 1915.
   Existing project.-This provides for:
   (a) A detached breakwater, east and west entrance piers, and a
dredged channel, 120 to 150 feet wide and 18 feet deep, from Lake
Michigan to the upper of two turning basins, which are also to have
a depth of 18 feet.
   (b) The repair and restoration of the westerly 1,000 feet of the
old east breakwater.
   (c) Dredging an anchorage shoreward of the restored section to a
depth of 12 feet in the northerly portion and 8 feet in the southerly
portion.
   (d) Enlarging the entrance to this basin through the east pier to a
width of 66 feet.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is 578.5 feet above mean tide at New York.
   Seasonal fluctuations in mean stage from low water in winter to
high water in summer average about 1.2 feet. Local and temporary
fluctuations of 0.1 to 0.5 foot, due to wind and difference in baro-
metric pressures, occur daily. Seiches of 3 to 4 feet occur at infre-
quent intervals.
   The estimate of cost for new work, revised in 1935, was $1,220,000,
exclusive of amount expended on previous project. The latest (1935)
approved estimate for annual cost of maintenance is $12,000.
   The existing project is based on the following reports and river
and harbor acts: The east breakwater and old east pier enclosing the
outer basin were based on the recommendations of a board of engi-
neers, as published in Annual Report for 1870. The original en-
trance piers were constructed prior to the project of 1870. The east
pier was extended in accordance with reports of boards of engineers,
as published on pages 2187-2189, Annual Report for 1881, pages
2264-2266, Annual Report for 1882; and in accordance with River
and Harbor Act of March 3, 1899. The west pier as at present
located and the present entrance-channel dimensions were authorized
1284    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

by joint resolution of Congress approved May 13, 1908 (Public, No.
23). The upper limit of the inner channel is in accordance with
the Annual Report for 1882. The act of March 3, 1899, provided
for the detached breakwater in accordance with the report published
on pages 2903-2904, Annual Report for 1897; the act of March 3,
1905, provided for the lower turning basin. The act of January
21, 1927, provided for the present depth in the channel and turning
basins, the elimination of the improvement of Trail Creek above the
middle turning basin and of the uncompleted portion of the de-
tached breakwater, and the abandonment of the old breakwater and
pier enclosing the harbor basin (H. Doc. 279, 69th Cong., 1st sess.).
The act of August 30, 1935, authorized the repair and restoration of
1,000 feet of the old east breakwater, dredging the outer basin, and
enlarging the entrance to the basin through the east pier. (Rivers
and Harbors Committee Doc. No. 34, 74th Cong., 1st sess.) For
latest published map see the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminal facilities at this harbor consist
of about 16,000 feet of wharfage, about 2,000 feet of which is owned
by the city; about 1,000 feet is in use. The terminal facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year-New work.-Prelimi-
nary work was continued in connection with dredging the yacht
harbor at a cost of $224.75. Repairs to east breakwater were com-
pleted at a cost of $4,346.81.   Enlarging the entrance gap to the
yacht basin was completed at a cost of $6,006.83. A total of 190,077
cubic yards of material (place measurement) was removed from
the outer basin (yacht harbor) by contract at a cost of $56,780.62.
   Maintenance.--Ice guard plates and life lines were replaced and
minor repairs were made to the east pier at a cost of $1,026.37.
Previous costs of dredging the channel were reduced $5.49.
   The total cost was $68,379.89, of which $67,359.01 was for new
work and $1,020.88 for maintenance,     The total expenditures were
$73,316.28.
   Condition at end of fiscal year.-The existing project was com-
pleted in December 1936, at a saving of $7,614 under the estimated
cost. Concrete superstructure was completed on the detached break-
water in 1925 and on the entrance piers in 1931. All structures are
in good condition. Under permit from the Secretary of War, the
Northern Indiana Public Service Co. removed 615 feet of the inner
end of the west pier, replacing this with a steel sheet pile bulkhead,
placed back of the former dock line, thus making an addition to
the area of the inner harbor. This new area has been dredged to
project depth by the same company. The controlling depth at the
harbor entrance is 15 feet. Depths in the entrance channel up to
the Franklin Street bridge vary from 16.1 to 22.8 feet. Between
the Franklin Street bridge and the bend immediately below the
Michigan Central Railroad bridge, the controlling depth is 9.5 feet.
From the latter point to the head of the project the depth is about
5 feet. The controlling depths in the outer basin are 12 feet in
the northerly portion and 8 feet in the southerly portion.
   Depths in the harbor entrance and entrance channel to head of
project are based upon soundings taken in April 1936, and depths
in outer basin upon soundings taken in December 1936. Depths are
                RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                                                           1285
referred to low-water datum. The mean water level in June 1937
was 0.10 foot above datum. The head of navigation for commercial
vessels is the turning basin at the head of the project, 1.04 miles above
the outer end of the west pier. Above this point depths are suffi-
cient for small launches only.
   The total cost was $2,199,913.28, of which $1,212,385.20 was for
new work and $987,528.08 for maintenance.           Total expenditures
were $2,199,913.28.
   Proposed operations.-The balance unexpended, together with an
allotment of $20,000 made in July, will be applied as follows:
Maintenance :
   Dredging with Government plant, spring of 1938-------------- $16, 00.21
   Riprapping piers and breakwaters, by contract, spring of 1938__ 4, 000. 00

          Total-----------------------------------------------                                              20, 090. 21
  Dredging will be necessary to restorg project depth in the channels.
Minor repairs to piers and breakwaters will be required. The addi-
tional sum of $17,000 can be profitably expended during the fiscal
year 1939, as follows:
Maintenance:
   Dredging with Government plant, spring of 1939_________________ $15, 000
   Repairs to piers and breakwaters, by contract, during fiscal year___ 2, 000
          Total------------------------------------------------------                                           17, 000
                                     Cost and financial summary
Cost of new work to June 30, 1937----------------------------                                       $1,499, 774. 17
Cost of maintenance to June 30, 1937--                                                                  87, 528. 08
                                                                                                       9-------------------------
     Total cost of permanent work to June 30, 1937------------                                       2, 487, 302. 25
Undistributed costs June 30, 1937
      Net total cost to June 30, 1937--------------------------2, 487, 302. 25
Plus accounts receivable June 30, 1937

         Gross total costs to June 30, 1937------------------------                                       , 487, 302. 25
Minus accounts payable June 30, 1937--________---                                    ----                              --

     Net total expenditures-------------------------------- 2, 487, 302.25
Unexpended balance June 30, 1937-----------------------------        90. 21

         Total amount appropriated to June 30, 1937--------------                                    2, 487, 392. 46

   Fiscal year ending June 30             1933                 1934           1935           1936               1937


                .........
Cost of new work--                                       --                                 $----------------
                                                                                            $5, 119. 80  $67, 359. 01
                            -
Cost of maintenance..-_-_......           7, 056. 73 -         -       -    $17, 670. 16       114.48                1, 020.88

      Total cost--_ -     ---------       7, 056.73 ____                     17, 760. 16     5, 234. 28         68, 379. 89
                 -
Total expended ..-       -_-   -__-----   1, 144. 12          $5, 912. 61    17, 760. 16       297. 89          73, 316. 28
Allotted__----_-----------------      -21, 025.90             14, 300. 00     7, 700. 00    84, 000. 00       -16,     800. 00


Balance unexpended July 1, 1936_---------------------------                                               $90, 206. 49
Deductions on account of revocation of allotment_------------                                              16,800. 00

      Net amount to be accounted for----------------------                                                  73, 406. 49
Gross amount expended----------------------                $75, 010. 86
Less reimbursements collected                                                          , 694. 58
                                                                                      1-------------------
                                                                                                        73, 316. 28
        Balance unexpended June 30, 1937---- ------------------                                                  90.21
1286           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_--------------------------------                                                              $20, 000. 00

      Balance available for fiscal year 1938--------------------                                                      20, 090. 21
Amount that can be profitably expended        in fiscal year ending
                                   -- -- -- ------- ---- --- ---- --- - -
June 30, 1939, for maintenance 1_                                                                                    17, 000. 00
1 Exclusive of available funds.


    8. EXAMINATIONS,                        SURVEYS, AND CONTINGENCIES                                (GENERAL)
   The cost of work during the year amounted to $41,291.22. The
expenditures were $33,759.88. The balance unexpended June 30, 1937,
$12,431.43, including accounts receivable, a transfer of $5,088.46 and
allotment of $61,000 made during July 1937, will be applied as needed
during the fiscal year 1938 to payment of expenses to be incurred
under this heading. The additional sum of $28,000 can be profitably
expended during the fiscal year ending June 30, 1939.
                                            Cost and'financial summary
Cost of new work to June 30, 1937-----------------                                                        -----------
Cost of maintenance to June 30, 1937--------------------------__                                             $238, 738. 58
      Total cost of permanent work to June 30, 1937--------------                                                 238, 738. 58
Plus accounts receivable June 30, 1937---------------------__                                                      11, 642, 87

      Gross total costs to June 30, 1937---------------------- ---                                                    250, 381. 45
Minus accounts payable June 30, 1937-          ------ ------------                                                      2, 285.96

      Net total expenditures_-----------------------------------                                                  248, 095. 49
Unexpended balance June 30, 1937___                                                                                    788. 56
           Total amount appropriated to June 30, 1937------ --------                                              248, 884. 05

           Fiscal year ending June 30                  1933           1934          1935                  1936              1937

Cost of new work---------------                               --   $-          ------------     -     -      -
Cost of maintenance .------------------            $21, 343. 81    $19, 065. 88 $21, 467. 82        $66, 091. 24          $41, 291.22

Total expended......-----------------------         21, 162. 53     18, 069. 97   20, 273. 48        85, 407. 04          33, 759. 88
Allotted     ----------------------------
            ....                                    23, 232. 23     40, 411. 45   30, 000. 00        64, 760. 37           20, 000. 00


Balance unexpended July 1, 1936------------------------------- $14, 548.44
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_--------_ -------------------------    _   20, 000. 00
      Amount to be accounted for------------------------------                                                         34, 548. 44
Gross amount expended_                                $58, 113. 21
Less reimbursements collected------------------------ 24, 353. 33
                                                                                                                      33, 759. 88
      Balance unexpended June 30, 1937------------------------                                                            788. 56
Outstanding liabilities June 30, 1937-------------------------_                                                         2,323. 67
           Balance         available        June 30,    1937___----_                                             --     1, 535.11
Accounts receivable June 30, 1937--------------------------------                                                      11, 642. 87

     Unobligated balance available June 30, 1937_---________
                                                  ---         _10,     107. 76
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------------------------------------      61,000. 00
           Balance available for fiscal year 1938_ ___---------------                                                  71, 107. 76

Amount that can be profitably expended in fiscal year ending
                                  , ,
June 30, 1939, for maintenance ____________ _---___ __---                                                             28, 00. 00
1 Exclusive of available funds.
               RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                                                        1287
            9. PLANT ALLOTMENT FOR CHICAGO, ILL., DISTRICT

                                   Cost and financial summary
                    UPPER MISSISSIPPI           VALLEY AND GREAT LAKES DIVISIONS

Undistributed costs June 30, 1937                                                                        380, 431. 98
                                                                                                        $-----------------------
Plus accounts receivable June 30, 1937--------------------------                                          84, 560. 46
      Gross total costs to June 30, 1937------------------                                  -----        464, 992. 44
Minus accounts payable June 30, 1937-------------------                                                   40, 651.27
     Net total expenditures---------------------------                                                   424, 341. 17
Unexpended balance June 30, 1937____ -_______-____-_____-_                                                 5, 508. 08
        Total amount appropriated to June 30, 1937--------------                                         429, 849. 25

        Fiscal year ending June 30                    1933         1934            1935        1936              1937


Total expended...      ....   ______   __   __ ________      _ ____________$215, 539. 07 $241, 259. 21     -$32, 457. 11
Allotted...... -----------------------------------------                     344, 304. 14   235, 545.11    -150, 000.00


Balance unexpended July 1, 1936    ---------------------------    $123, 050. 97
Deductions on account of revocation of allotment----------------150, 000. 00

       Net amount to be accounted for_____________ __________        -- 26, 949.03
Gross amount expended ________---_________-__          $771, 363.36
Less :
    Reimbursements collected-------      $796, 217. 09
    Receipts from sales________________     7, 603. 38
                                                        803, 820. 47
                                                                               -                        -32,     457. 11

      Balance unexpended June 30, 1937-------------------                                                      5, 508.08
Outstanding liabilities June 30, 1937________-------    $45,987.88
Amount covered by uncompleted contracts-             __   2, 575. 00
                                                                                                          48, 562. 88

     Balance available June 30, 1937_____------ -----------                                             -- 43, 054.80
Accounts receivable June 30, 1937----- __------------       __ ----                                        84, 560. 46

        Unobligated balance available June 30, 1937_______________                                        41, 505. 66

Status of reports called for by river and harbor acts and committee resolutions

        Locality               Authorization act         Transmitted
                                                         to Congress          Document no.              Recommenda-
                                                                                                            tion


Calumet Harbor and            Rivers and Harbors
River, Ill. and Ind.           Committee resolu-
                               tion, Dec. 22, 1936.
Chicago Harbor, Ill .-__      Rivers and Harbors June 21, 1937- -Unfavorable.
                                Committee resolu-
                                tion, May 18, 1936.
Great Lakes, coast of,        River and Harbor Act,-------------------------
  harbors of refuge.           Aug. 26, 1937.
Indiana Harbor         and    Rivers and Harbors         Jan.    6, 1937   Rivers and Harbors            Favorable.
  Canal, Ind.                  Committee resolu-                             Committee, 13, 75th
                               tion, Feb. 26, 1936.                         Cong., 1st sess.
Michigan Lake, Ind., River and Harbor Act,--
establishment of har-  Aug. 26, 1937.
bor at most suitable
site.
New Buffalo, Mich _-__ River and Harbor Act, Dec. 17,1936                           __      ____    _     Unfavorable.
                        Aug. 30, 1935.
Wilmette Harbor, Ill .-    do--......    ...-
1288    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
           DETROIT, MICH., DISTRICT
  This district includes the lakes, rivers, and harbors along the east
coast of the State of Michigan and northwest portion of the State
of Ohio from St. Marys River on the north to Port Clinton Harbor
on the south, both inclusive.
  District engineer: Col. V. L. Peterson, Corps of Engineers.
  Division engineer: Col. L. V. Frazier, Corps of Engineers.
                                   IMPROVEMENTS

                                    Page                                   Page
1. St. Marys River, Mich       .    1288 10. Black River, Mich--------- 1315
2. Channels in Straits of Mack-          11. Clinton River, Mich----- -1317
      inac, Mich ___________        1296 12. Rouge River, Mich--___-       1319
3. St. Clair River, Mich-------     1297 13. Monroe Harbor, Mich------ 1322
4. Channels in Lake St. Clair,           14. Toledo Harbor, Ohio------- 1326
      Mich_---_ ___-_----- -        1300 15. Put in Bay Harbor, Ohio___    1328
5. Detroit River, Mich-.......      1303 16. Port Clinton Harbor, Ohio__ 1329
6. Cheboygan Harbor, Mich__         1308 17. Examinations, surveys, and
7. Alpena Harbor, Mich---_          1310       contingencies (general)__ 1330
8. Saginaw River, Mich- ---- _      1312 18. Other projects for which no
9. Harbor of Refuge at Harbor                  estimates are submitted___ 1331
      Beach, Lake Huron, Mich-      1314 19. Plant allotment_------------1331

                       1. ST. MARYS RIVER, MICH.

   Location.-This river flows from the eastern end of Lake Superior
into the northern end of Lake Huron. (See U. S. Lake Survey Chart
No. 9.)
   Previous projects.-Authorized by river and harbor acts of July
8, 1856, June 14, 1880, August 2, 1882, and August 5, 1886. The total
cost and expenditure prior to the adoption of the existing project in
1892 was $2,904,807 for new work. (For further details see p. 1956,
Annual Report for 1915.)
   Existing project.-This provides for channels through St. Marys
River, which, at low-water datum, are suitable for vessels drawing
20 feet when up-bound and 24 feet when down-bound, with a least
width of 500 feet in the up-bound and 300 feet in the down-bound
routes. The specific improvements embrace channels through shoals
between Lake Superior and the head of the falls, having minimum
widths of 1,000 feet with depths at low-water datum of 27 feet
through Round Island Shoals and Middle Ground and 26 feet
through Vidal Shoals; widening Brush Point Turn to bottom width
of 1,200 feet and channel from Brush Point to Point Louise to bot-
tom width of 1,000 feet; constructing and operating four locks, two
canals, and an emergency dam for each of the canals at the falls;
deepening and widening the tailrace of the United States power
plant; constructing remedial works at the inlet of the power canal
of the Michigan Northern Power Co.; constructing compensating
works at the falls; dredging through shoals between the lower end of
the canals and the upper entrance to Lake Nicolet, including exten-
sion of anchorage and maneuver area below the locks and the widen-
ing of angle at black gas buoy no. 33; dredging to widen and deepen
the upper entrance channel into Lake Nicolet; excavating channels
from Lake Nicolet to Lake Munuscong on either side of Neebish
                 RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                1289
Island, a distance via West Neebish of 14 miles and via Middle
Neebish 15 miles, the Middle Neebish, or up-bound, route to have a
least width of 500 feet, and the West Neebish, or down-bound, route
300 feet; and dredging shoals between Lake Munuscong and the
mouth of the river. The following table shows the principal fea-
tures of the four locks and emergency dams. All structures are
located at Sault Ste. Marie, Mich.:

                                                              Weitzel lock         Poe lock         Davis lock        Fourth lock


Miles above mouth___                -------------               47 ..---------...     47 ......          47----.......... 47.
Clear width of chamber....      -------------      feet __ 0 at gates...-             100_______.........80.._......      80.
Length between miter sills                                      515
                                                  d------------do....       .-------- 800-------- 1,350-                  1,350.
Lift 1-----------------                           do.... 21.7---------.21.7-------                       21.7--------.21.7
Depth on upper breast wall 1---........           do-...        15.8- .......         21.8......         24.3-...         24.3.
Depth on lower breast wall 1---...do.....                       11.2- .......         16.6-.....         23.1-...         23.1.
Foundation             _________________________                Rock                  Rock ..             Rock____--__    Rock.
Type of construction ______________________ Masonry____ Masonry __                                                    __ Concrete.
                                                                                                          Concrete ....
Estimated cost__________________________                        $1,160,000_....       $4,738,865 2__ $6,200,000 3_ $3,275,000.4
Actual cost_____________________________                   _ $983,335-....            $2,837,337 ...     $2,200,000 -__ $1,750,000.
Completed ____________________________________ Sept. 1, 1881_ Aug. 3, 1896                                Oct. 21, 1914 Sept. 18, 1919


      Emergency dams                              South Canal                                      North Canal


Miles above mouth           47__ ____________    ___   ___    47.
Estimated cost...---------- $240,000_ ---------------------- $300,000.
Type------------------Swing bridge, sliding wickets-....      Removable trusses, revolving wickets.
Cost, completed --------- $294, 608.16 ______________________$269, 224.31.6
Year completed -____----    1911.. _____________________-1922.

  1 At low water, 601.1 above and 579.4 below.
  2 Includes cost of deepening and enlarging South Canal.
  8Includes cost of North Canal.
  4 Includes canal excavations to provide necessary approaches to lock, canal walls, and piers, and emer-
gency dam.
  5 Opened to commerce.
  6 Including engineering, office, and inspection.
  NOTE.-The limiting draft to the locks is determined by the depth over the breast walls.


  The Weitzel lock was operated and maintained under the perma-
nent indefinite appropriation from September 1, 1881, the Poe lock
from August 3, 1896, the Davis lock from October 21, 1914, and the
fourth lock from September 18, 1919, to the end of the fiscal year
1935. The old State locks were operated and maintained under the
same appropriation from June 9, 1881, to November 2, 1886, after
which these locks were destroyed by excavation for the present Poe
lock.
  In the following table are stated other characteristic features of
the improvements belonging to the existing project:
1290              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                                                                                         Project
                                                                      Dis-   Used by                                                     datum
                                                                     tance    up- or                                           t         planes
          Name of improved channel                           Length  from     down-                       rojec            roject         above
                                                                    mouth     bound                       width            depth        mean tide
                                                                    of river vessels                                                     at New
                                                                                                                                          York


                                                       Feet     Miles                    Feet                                  Feet           Feet
Round Islahd Middle Ground .-------- -------                        57 Both----_, ------------                                  27               601.5
Round Island Shoal No. 1 ------------                  5, 000       57 __do .-              1,000                               27               601. 5
Round Island Shoal No. 2________________              9, 800        54 ___do ..--           1, 000                              27               601. 5
Brush Point to Point Louise ............              9, 000        52 ___do ---    1, 000-1, 200                               26               601. 3
Vidal Shoals ----------------------- -__ 9, 100                    48 -__do...      1, 000-1, 500                               26               601. 2
South Canal-..---       -------------------- 8, 235                47 ___do ----
   West approach--------------------------- ------------------                                 108                              24               601.   1
   Weitzel lock..---------------------- -------- ------------------                             60                              12. 6            579.   4
   Poe lock-----------------------
                        _                      ---- ----.------------------                    100                              18               579.   4
   East approach-----          ----------.- ---.-- -- ...                 .. . .               340                              19. 5            579.   4
North Canal....------------------------8, 520                      47   Both_ -                                                           -       --
   West approach           _ --                                                                280                              24               M01.1
   Davis lock                                                               --                  80                              24. 5            579. 4
   Fourth lock                                      -------. --                                 80                              24. 5            579.4
   East apuroach ...           -            -        --....                                    312                              24. 5            579. 4
Course 1, Bayfield Channel, anchorage                 9, 237       45   Both .      1, 300-1, 500                               26               579. 3
and maneuver area.
Courses 2 and 3, Little Rapids .-.........           24, 193        40 ___do.--                600                              25      579. 2-578. 9
Lake Nicolet...._____________________________ 22, 000              36 -- do .--             1, 500                              26             578. 8
Middle Neebish (up-bound route):
    Course 5, lower end of Lake Nicolet___ 17, 900                 33   Up        .            500                              21             578.     8
   Course 6, dike                                    16, 918        30 ___do ....              500                              21      578. 7-578.     6
    Course 7, Munuscong Channel .......              17, 586        27 __do .__-               500                              21             578.     6
   Course 9, Sailors Encampment Chan- 12, 400                       22 ___do ....              500                              21             578.     5
      nel.
West Neebish (down-bound route):
    Course 4, lower end of Lake Nicolet___ 10, 762                  34 Down_-                  300                              25             578. 8
    Course 5, lower end of Lake Nicolet___ 23, 370                  29 ___do .                 300                              25             578. 8
    Course 6, Rock Cut......_________________ 14, 064               27 ___do .--               300                              27      578. 7-578. 6
    Course 7-         -          -            -_     13, 270        24 ___do .-..              300                              25             578. 5
    Course 8, Moon Island__              --          12, 600        21 ___do ....              300                              25             578. 5
Lake Munuscong, Twin Island to Lime 26, 459                         12 Both _               1, 000                              26             578. 5
Island.
Crab Island Shoal___--------------------               1,300      _- -    do -          ---------                               26               578. 5

  1   2 channels past Bridge Island, each 108 feet wide; minimum width of connecting channel, 304 feet.


                                                       Projects cost estimates

                                                                                                                               Year     Amount of
                                                                                                                               made      estimate


Round Island Shoals 1 and 2 and Vidal Shoals (dredging channel)                                                                1891          $85, 487
Brush Point to Point Louise_________________________________                                                                   1935          175, 500
Vidal Shoals Channel (widening)                    ---------------------------------------                                                   298 000
Round Island Middle Ground (dredging) ...---- --                        ...............................                        1925          802, 000
W eitzel lock, including deepening canal_                                                 ..........................
                                                                                                          .-------......       1878       2, 460, 000
Poe lock -                                                                                                                     1886       4, 738, 865
Canal widening .-............................................--------------------                                              1904       1, 020, 000
D avis lock - -. . . . . . . . . . .. . . . . . . . . . . . . --- -                                                            1906       6, 200, 000
Fourth lock ------------------      ----------------         --------------------------                        -----           1910       3, 275, 000
Extension northwest pier _______________________________                                                                       1925          277, 000
Ship channel --                                                                                                                1891          556, 333
Lake Nicolet (Hay Lake) and Neebish Channels___                                                                                1900       5,750, 000
Extension anchorage and maneuver area below locks----------__                                                             _    1920          245, 000
Middle Neebish route (widening channels) ....              ________________________ ..__                             _______   1925       3,842, 000
Down-bound route (deepening channels)                      ------------------------------------                                1928       8, 006, 300
        Total----..................-----------------------------------------------------.......--------.                                 37,731,485
         RIVERS AND HARBORS-DETROIT, MICH., DISTRICT             1291
   The project depths are referred to low-water data for Lakes
Superior and Huron, which are 601.6 and 578.5 feet above mean tide
at New York.
   Each year the St. Marys River rises and falls about 1 foot as
measured by the monthly mean levels.         Since 1860 the difference
between the highest and lowest monthly mean levels above the locks
has been about 33% feet, and below the locks about 7 feet. From
day to day the level fluctuates somewhat, due to wind and baro-
metric pressure, such changes frequently amounting to several inches
and sometimes to a foot or more. In addition to these changes in
level, occasionally a considerable oscillation takes place within 2
or 3 hours, which is somewhat in the nature of a seiche; such
changes amounting to over 5 feet have been known to occur within
3 hours.
   The estimate of cost for new work, revised in 1935, is $32,040,500,
exclusive of amounts expended on previous projects.         The latest
 (1935) approved estimate for annual cost of maintenance, including
$251,000 for operation and care of the locks, is $327,000.
   Tailrace deepening: The River and Harbor Act of- March 4, 1915,
provided for the deepening and enlargement of the tailrace of the
United States power plant between the powerhouse and deep water
at the foot of the rapids, a distance of about 2,250 feet, estimated
cost $150,000, and authorized the diversion for this purpose of so
much as might be necessary of the unexpended balance of appro-
priations for the Davis lock.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided for the Weitzel
lock and improving the existing State canal by widening and deep-
ening in accordance with report by Maj. O. M. Poe, Corps of En-
gineers, United States Army, not published; act of August 5, 1886,
provided for the Poe lock (H. Doc. No. 72, 49th Cong., 2d sess.);
act of July 13, 1892, provided for dredging through the shoals above
the falls and the shoals below the falls between the lower end of
the canal and the upper entrance channel into Hay Lake, now Lake
Nicolet (H. Ex. Doc. No. 207, 51st Cong., 2d sess., and Annual Report
for 1891, p. 2810); acts of June 13, 1902, and March 3, 1905, pro-
vided for enlarging the old canal (H. Does. Nos. 128, 56th Cong.,
2d sess., and 215, 58th Cong., 3d sess.); act of March 2, 1907, pro-
vided for the Davis lock and second canal and emergency dam
 (plan 3, H. Doc. No. 333, 59th Cong., 2d sess.); act of July 25, 1912,
provided for the fourth lock (H. Doc. No. 64, 62d Cong., 1st sess.) ;
act of September 22, 1922, provided for the widening of the upper
approach to the canals through Vidal Shoals, and the extension of
anchorage and maneuver area below the locks (report of district
engineer, dated Oct. 29, 1920, printed in H. Rept. No. 775, 67th
Cong., 2d sess., pp. 30--32); act of March 4, 1915, provided for deep-
ening the tailrace of the power plant; act of March 3, 1909, pro-
vided for the lease of water power at the falls, and the lease entered
into with the Michigan Northern Power Co. provided for the con-
struction of remedial and compensating works; act of June 13, 1902,
provided for the Hay Lake and Neebish Channels work in that
section of the river below the locks (H. Doc. No. 128, 56th Cong.,
2d sess.).   The act of January 21, 1927, provided for removal of
Round Island Middle Ground, extension of Northwest Canal pier,
1292    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and widening channels MiddleNeebish route (H. Doc. No. 270, 69th
Cong., 1st sess.); act of July 3, 1930, provided for deepening chan-
nels throughout the down-bound route (H. Doc. No. 253, 70th Cong.,
1st sess.); act of August 30, 1935, provided for widening Brush
Point Turn and the channel from Brush Point to Point Louise
 (R. and H. Com. Doc. No. 53, 74th Cong., 1st sess.).
   The latest published maps are in the last-mentioned document and
in House Document No. 253, Seventieth Congress, first session.
   Operation and care of the canal and locks were included in the
project July 1, 1935, under the provisions of the Permanent Appro-
priations Repeal Act approved June 26, 1934.
   Terminal facilities.-This improvement serves the through com-
merce between Lake Superior and the lower lakes, and it has not
materially influenced the terminal facilities at the towns along its
:route, which consist mainly of small docks for the accommodation of
local traffic. Several coaling docks for through-traffic accommoda-
tion have been established at Sault Ste. Marie, Lime Island, and
  Detour.
   Operations and results during fiscal year-New work.-Contract
work for widening the channel from Brush Point Turn to Point
Louise was begun May 25 and continued during the remainder of the
fiscal year, 128,100 cubic yards, place measure, of material being
removed.
   Maintenance.-During the period July 1 to August 14 the U. S.
dredge Colonel D. D. Gaillard removed a total of 43,558 cubic yards,
scow measure, from Sailors Encampment and miscellaneous shoals
in angle courses 6-7, Middle Neebish Channel, and other obstructions
in lower St. Marys River. The U. S. derrick boat Merganser re-
moved a total of 2,792 cubic yards, scow measure, from miscellaneous
shoal areas in the Middle Neebish Channel between October 16, 1936,
and June 30, 1937. Examination of existing channels by sounding
and sweeping was continued. Automatic water level gages were
maintained and lake level records compiled.
    Operating and care-St. Marys Falls Canal.-The canal was open
to navigation 253 days, from July 1 to December 16, 1936, and from
April 8 to June 30, 1937. During that time a total of 15,852 vessels,
aggregating 61,766,937 registered tons, and carrying 81,574,998 short
tons of freight and 19,450 passengers, passed through the Poe, Davis,
and Fourth locks in 10,504 lockages.
    The canal and locks were operated as required, and the necessary
repairs made thereto and to the appurtenant structures. An area
of 5,820 square feet of the north wall of the Davis lock was resur-
faced with pressure concrete.
                   RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                1293
  Total costs during the fiscal year, all from regular funds, were
distributed as follows:
New work: Widening channel from Brush Point Turn to Point
  Louise----------------------------------$26,                                                                               218.67
Maintenance :
        Dredging by Government plant-------------------$36,                                                931. 54
        Examinations, surveys, and contingencies--------                                               32, 724. 52
                                                                                                                       69, 656. 06
Operating and care:
    Operation of Poe, Davis, and Fourth locks and
       canal--------------------------------------- $190, 425. 87
    Ordinary repairs to locks, canal piers, buildings,
      etc------------------------------------------      114, 418. 13
    Improvements and reconstruction         (resurfacing
      Davis lock wall) ------------------------------     65, 492. 87
                                                                                                                      370, 336. 87
                Total _         --------                     ----------------------------                             466, 211. 60
   Total expenditures during the fiscal year were $469 884.05.
   Condition at end of fiscal year.-The existing project, except for
the modification made by the act of August 30, 1935, was completed
in 1935. There remains to be done the widening of the channel from
Brush Point Turn to Point Louise. The work already done has con-
sisted of dredging, rock excavation, and the construction of locks,
dams, canals, piers, and remedial and compensating works. The
following table gives project depths, controlling depths, widths,
lengths; and percentage of completion of the several channels covered
by the project at the close of the fiscal year:

                                                         Pn- Prt Con-               P
                                                                                    Project          Length
                                                                                                     Leof
                                                                                                       ngth       Percentage of
         Name of channel or locality                      depthtrolling             width            chanel        completion
                                                            ep        depth                          channel

                                                             Feet      Feet          Feet             Feet
Round Island Middle Ground---...........                      27        26.8-    ---------                         Completed in
                                                                                                               _--------          1932.
Round Island Shoal No. 1 ....-            -       _. ...      27        26.8            1, 000         5, 000            Do.
Round Island Shoal No. 2__----------                          27        26. 8           1,000          9, 800            Do.
Brush Point to Point Louise...------------ 26                         _____      1,000-1,200           9, 000 19.
Vidal Shoals (rock)-------------------                        26        25. 8    1,000-1, 500          9, 100 Completed in        1933.
South Canal-- -                ----------------------                  ---------------             -- 8, 235
   West approach_ __-----_ _____-.                            24        23. 8            2 108     ----------      Completed in   1911.
   Weitzel lock 1-------_--........                     .     12. 6     11. 2               60----------           Completed in   1881.
   Poe lock---__-------         ....        -____-        -   18        16. 6              100-----          __ Completed in      1896.
   East approach_--------
                       .....                   -              19. 5     18. 1              340---------- Completed in             1915.
North Canal-_            -                                                                             8, 520
    West approach             ,_                              24        23. 8              280           ----      Completed in   1914.
   Davis lock___---.       ..---------...--                   24.5      23.1                80      .----.----           Do.
    Fourth lock _----------------------                       24. 5     23. 1               80----------           Completed in   1919.
    East approach----              _______,____.              24. 5     23. 1              312----      ____.            Do.
Course 1, Bayfield Channel, anchorage                         26        24. 7    1, 300-1, 500         9, 237      Completed in    1934.
and maneuver area.
Courses 2 and 3, Little Rapids...........                     25        23.8                 600      24, 193      Do.
Lake Nicolet__--------                     ___ __ --          26        24. 8             1, 500      22, 000   Completed in 1933.
Middle Neebish (up-bound route):
    Course 5, lower end of Lake Nicolet.                      21        20.0                500       17, 900   Completed in 1929.
    Course 6, dike (rock)------_                 -------.     21        20. 4               500       16, 918   Completed in 1930.
    Course 7, Munuscong Channel-.....                         21        20.3                500       17, 586      Do.
    Course 9, Sailors Encampment                              21        20. 3               500       12, 400      Do.
      Channel (rock).
West Neebish (down-bound route):
    Course 4, lower end of Lake Nicolet_.                     25        23.7                 300      10, 762   Completed   in 1932.
    Course 5, lower end of Lake Nicolet._                     25        23.7                 300      23, 370      Do.
    Course 6 (rock cut)----------------- 27                             26. 7                300      14, 064   Completed   in 1933.
   Course 7_--------------..-..-----..                      - 25        23. 7               300       13, 270   Completed   in 1932.
    Course 8, Moon Island_ __----___                          25        23.7                 300      12, 600      Do.
Lake Munuscong, Twin Island to Lime                           26        24. 8             1, 000      26, 459   Completed   in 1934.
Island.
Crab Island Shoal__..--...--......--.                         26        27. 0   --------------.............
                                                                                                      1, 300    Completed in 1933.

  1 Out of commission since Oct. 31, 1918.
  2 Two channels past Bridge Island, each 108 feet wide; minimum width of connecting canal channel, 304
feet.
1294       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The costs have been for new work $31,897,547.54, including
$158,400.98 from Public Works funds, for maintenance $1,664,880.07,
a total of $33,562,427.61. The total expenditures were $33,363,688.73
from regular funds and $158,400.98 from Public Works funds, a total
of $33,522,089.71.    In addition the sum of $7,028,127.19 was ex-
pended between 1881 and June 30, 1936, on operation and care of the
works of improvement under the provision of the permanent indefi-
nite appropriation for such purposes.
  Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the fiscal year, $190,058.47, plus an
allotment of $460,000 made July 20, 1937, a total of $650,058.47, will
be applied as follows:
Regular funds: Accounts payable June 30, 1937----------------- $40, 502. 53
New work: widening channel at Brush Point Turn, by contract,
July 1 to Dec. 31, 1937_____________----------------------__________------------        104, 400. 00
Maintenance:
   Channel sweeping and removing shoals and ob-
      structions in lower river by United States
      derrick boat, summer and fall, 1937------------ $28, 800. 00
   Dredging by U. S. dipper dredge Gaillard, angle
      course 5-6 and lower end of course 6, Middle
      Neebish Channel, July 1 to Aug. 31, 1937___                          34, 200.00
    Dredging by United States hopper dredge in the
      lower river south of Nine Mile Point, 1 month,
      July and August 1937__________-----___                               20, 000. 00
    Engineering, surveys, and contingencies---_______                      20, 155. 94
                                                                                          103,155.94
Maintenance (operating and care), St. Marys Falls
  Canal, Mich.:
    Operation of Poe, Davis, and Fourth locks ------ 208, 000. 00
    Ordinary repairs -------------------------------                     124, 000. 00
    Improvements and reconstruction --------                        __ 69, 000. 00
    Emergencies------------------1,                                              000. 00
                                                                                         402, 000. 00
        Total for all work                                                                   058. 47
                                                                                       6-----------50,
  It is of vital importance to through traffic between the upper and
lower lakes that full project dimensions be maintained in the chan-
nels of St. Marys River and that the operation and care of the locks
at the Soo be continued. For these purposes the sum of $445,000 can
be profitably expended during the fiscal year ending June 30, 1939,
to be applied as follows:
Maintenance :
   Channel sweeping and removing shoals and obstruc-
      tions by United States derrick boat during fiscal
      year 1939--------------------------------------    $33,000
   Engineering, surveys, and contingencies______________ 22, 000
                                                                                        $55, 000. 00
Maintenance (operating and care) :
    Operation of Poe, Davis, and Fourth Locks---------- 208, 000
   Ordinary repairs_________________________________     112, 000
    Improvements and reconstruction   ----------------    69, 000
    Emergencies----------------------------------------,      000
                                                                                        390, 000. 00
        Total for all work           --                          -             _        445, 000. 00
               RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                        1295
                                 Cost and financial summary

Cost of new work to June 30, 1937--------------------------                                                       $34, 802,354. 54
Cost of maintenance to June 30, 19378______------------ -   _                                                     28,  693, 007. 26
      Total cost of permanent work to June 30, 1937______                                                          43, 495, 361. 80
Undistributed costs June 30, 1937                                                                                           1________-------------
                                                                                                                                 83

      Net total cost to June 30, 1937___ ______------.____                                                         43, 495, 522. 63
Plus accounts receivable June 30, 1937 ----------------------                                                                 3. 80

     Gross total costs to June 30, 1937__---------------___                                                        43, 495, 526. 43
Minus accounts payable June 30, 1937______40,                                                                               502. 53

     Net total expenditures-------------                                ----------------                     12   43,455, 023. 90
Unexpended balance June 30, 1937                                                                                            190, 054. 67

         Total amount appropriated to June 30, 1937____________                                               1243,     645,078. 57

   Fiscal year ending June 30            1933             1934                 1935                        1936                 1937
                                 $,8,95o -
                                Csonw
Cost of new work     --
Cost of maintenance ..
                                 $1,489,892.56
                                    308, 427. 20
                                                       $506, 656. 42
                                                        258, 382.39
                                                                            $209, 530. 33
                                                                             462, 705.56                $309,737.52
                                                                                                                               $26, 218. 67
                                                                                                                               439, 992. 93
                                                                                    -   -       -   I                   I


      Total cost _                1, 798, 319.76        765, 038. 81         672, 235. 89                309, 737. 52          466, 211. 60

Total expended .-.                2, 027,068.22         797, 820. 45         481, 503. 84                282, 899. 12          469, 884. 05
                                                   I                    I                           I                   i
Allotted _-_                      1, 827,635.93         864, 604. 15         260, 154. 86                402, 606. 75           81, 500.00


Balance unexpended July 1, 1936                        _____                                                            $578, 438.72
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936    --------                --   --                                                                     126, 500. 00

      Amount to be accounted for ______________________                                                                     704, 938. 72
Deductions on account of revocation of allotment __________-
                                                         .                                                                   45, 000. 00

         Net amount to be accounted for__                                                                                   659, 938. 72
Gross amount expended              ---          ----                   --       $477, 578. 76
Less:
    Reimbursements collected                               $6, 943. 17
    Receipts from sales                      _______           751. 54
                                                                                            7, 694. 7 1
                                                                                                                            469, 884. 05

      Balance unexpended June 30, 1937---------                                                                             190, 054. 67
Outstanding liabilities June 30, 1937--___-____- __                                  40, 502. 53
Amount covered by uncompleted contracts--------                                     104, 628. 34
                                                                                                                            145, 130. 87
     Balance available June 30, 1937________                                                                                 44, 923. 80
Accounts receivable June 30, 1937                                                       _________                                  3. 89
     Unobligated balance available June 30, 1937_                                                                            44, 927. 60
Amount allotted from War Department Civil Appropriation
   Act approved July 19, 1937--------------_-                                   -           -                           460, 000. 00

     Balance available for fiscal year 1938-------_______                                                               504, 927. 60
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 3_________-_-                                                                           445, 000. 00
   1 Includes $158,400.98 Public Works. funds.
   2 Includes $7,028,127.19 from permanent indefinite appropriations.
   8 Exclusive of available funds.
         20196-37-pt. 1-82
1296     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

          2. CHANNELS IN THE STRAITS OF MACKINAC, MICH.
   Location.-This waterway connects Lakes Michigan and Huron
at their upper ends. (See U. S. Lake Survey Chart No. 6.)
   Existing projects.-Channel between Mackinac Island and Round
Island, Mich.-The project provides for a channel between Mackinac
Island and Round Island, Mich., 1,250 feet wide and 27 feet deep
below low-water datum, elevation 578.5 feet, and 3,250 feet long.
   The estimate of cost for new work, revised in 1934, is $434,000, with
$500 annually for maintenance. The existing project was authorized
by the Public Works Administration September 6, 1933, and by the
River and Harbor Act of August 30, 1935 (Rivers and Harbors Com-
mittee Doc. No. 2, 72d Cong., 1st sess., which document contains the
latest published map).
   Poe Reef Shoal.-The project provides for the removal of Poe Reef
Shoal to a depth of 27 feet over an area of about 22,000 square yards.
   The project depth is referred to low-water datum for Lake Huron
which is 578.5 feet above mean tide at New York. The estimate of
cost for new work made in 1935 is $50,000. There is no approved
estimate of cost for maintenance.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 53, 74th
Cong., 1st sess.). The only published map is in that document.
   Terminal facilities.-None.
   Operations and results during fiscal year-Poe Reef Shoal--Regu-
lar funds, new work.-Contract work for grading Poe Reef Shoal to
a minimum swept depth of 27 feet below elevation 578.5 feet above
mean tide at New York was commenced July 17, 1936, and completed
May 20, 1937; an area of 51,389 square yards was graded and mate-
rial in amount of 4,860 cubic yards, scow measure, was removed.
Total costs during the fiscal year were $29,544.12 and total expendi-
tures were $29,537.22, all for new work.
   Condition at end of fiscal year-Poe Reef Shoal.-The existing
project was completed in 1937 at a saving of $20,455 under the esti-
mated cost. The controlling depth in the channel is 27 feet. Total
costs $29,544.12 and total expenditures $29,537.22, all for new work.
   Channel between Mackinac Island and Round Island.-The existing
project was completed in 1935 at a saving of $14,600 under the esti-
mated cost. The controlling depth in the channel is 26.9 feet. Total
costs and expenditures were $419,399.87, all for new work from public
works funds.
   Proposedoperations.-The balance unexpended at end of fiscal year
 ($462.68) less accounts payable June 30, 1937 ($6.90) a net balance of
$455.78 is available for revocation. No work is proposed during the
fiscal years 1938 or 1939.
                         Cost and financial summary
Cost of new work to June 30, 1937___---____________ _______ $448, 943. 99
Cost of maintenance to June 30, 1937_________________________
      Total cost of permanent work to June 30, 1937________    448, 943. 99
Minus accounts payable June 30, 1937 ----____-______-_____       -6.     90
      Net total expenditures----
                           ....                                448, 937. 09
Unexpended balance June 30, 1937------
                                ......---                       - 462. 78
       Total amount appropriated to June 30, 1937--
                                                _..-           449, 399. 87
                RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                      1297

         Fiscal year ending June 30                      1933            1934             1935                1936               1937


Cost of new work......--------- --------------------- $6, 046. 17 $285, 247. 23 $128, 106. 47   $29, 544. 12
Cost of maintenance------------------     ----------------------------------------            ------------
Total expended----------------                ----- ------------        6, 046. 17    203, 043. 74         210, 309. 96        29, 537. 22

Allotted------           ------------------------------- 434, 000. 00                .-----.-              35, 399. 87


Balance unexpended July 1, 1936----------------------------                                                            $50, 000.00
Deductions on account of revocation of allotment------------ -----                                                      20, 000. 00

      Net amount to be accounted for-----------------------                                                                 30, 000. 00
Gross amount expended-------- -------------------------------                                                               29, 537. 22

      Balance unexpended June 30, 1937-------------- ----------                                                                462. 78
Outstanding liabilities June 30, 1937 -----------------------------                                                              6. 90
          Balance available June 30, 1937---------------------------                                                           455.88

                                       3.    ST. CLAIR RIVER, MICH.

  Location.-This river connects Lakes Huron and St. Clair.                                                                        (See
U. S. Lake Survey Chart No. 43.)
  Existing project.-This provides for channels as follows:

                                                                                  Used by                                      Project
                                                                        Used by                                                datum
         Name of channel                    Length of  Distance         up-und        Project                 Project          planes
                                             channel from mouth         or down-      width                   depth          above mean
                                                                               ound                                            tide at
                                                                         vessels                                              New York


                                              Feet        Miles                             Feet                Feet             Feet
Foot of Lake Huron---------..........---       25, 000       42         Both.....                800                   26     578. 5-578.3
Port Huron Middle Ground_....                   8, 000       37. 5      Down-..         1,000-1,400                    25     577. 7-577. 3
Shoals Port Huron to Marys-                    15, 000       34. 0      Both.....             1, 000                   25     577. 3-576. 9
  ville.
Shoals Marysville to Stag Is-
  land.
                                               8, 000           32.0    --do.....                 1,000                25     576. 8-576. 6
Stag Island-East Channel.....                  15, 000          31. 0 Up-                            800               20     576.6-576. 3
Shoals Stag Island to St. Clair-_              28, 000          27. 0 Both .....                  1, 000               25     576. 5-575. 9
St. Clair Middle Ground.......                  4, 500          25.0 -- do-...                       900               25            575. 8
Marine City Shoal_______.___.                   5, 800          19. 0 _ do _                      1, 000               25     575. 2-575. 1
Shoals Michigan Salt Works to                  18, 000          15.0 - do- .                      1, 000               25     575. 0-574.8
  Roberts Landing.
Head of Russell Island Shoal__-                 5, 500          12. 5 .. do...                  1, 000                 25     574. 6-574. 5
Grand Pointe and Squirrel Is-                  15, 000           7. 0 ___do..              1, 000-600                  25     574. 4-574.2
  land Shoals.
Southeast Bend from Harsens                    18, 000           3. 5   .__do-.....                 600                25     574.1-573.8
  Island Range Light No. 17a to
  Light No. 5.
Shoals from Light No. 5 to St.                 10, 000           1.0 _..do......                600-700                25     573. 7-573. 6
  Clair Flats Canal.



   The project also provides for compensating works, consisting of a
number (estimated at 31) of submerged rock sills, with crests 31 feet
below datum.
   The project depths are referred to local low-water datums which
correspond to low-water datums for Lakes Huron and St. Clair,
which are 578.5 and 573.5 feet above mean tide at New York. The
water level of this river fluctuates with the levels of the lakes above
and below it, which during the course of each year are subject to a
consistent seasonal rise and fall, the lowest stages prevailing during
the winter months and the highest during the summer months.
   At the head of St. Clair River, as measured by monthly mean
levels, the water may rise and fall each year during the navigation
season as much as 1.3 feet. During the past 26 navigation seasons the
1298       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

difference between the highest and lowest monthly mean levels has
been about 4.9 feet. Occasional fluctuations due to winds of high
velocity may be as much as 3.5 feet in 6 hours.
    The estimate of cost for new work, revised in 1937, is $6,050,000,
including $2,900,000 for construction of submerged sills.
   The latest (1930) approved estimate for annual cost of mainte-
nance of dredged channels is $33,500. No expense of maintenance
will probably be required for submerged sills.
   The existing project was authorized by the following river and
harbor acts: The act of July 13, 1892, provided for a 20-foot chan-
nel in the river (H. Doc. No. 207, 51st Cong., 2d sess.) ; act of July
27, 1916, provided for a channel along the Port Huron water front
 (H. Doc. No. 782, 64th Cong., 1st sess.); and the act of July 3, 1930,
provided for the deepening of the channel to 25 and 26 feet and
for compensating works (H. Doc. No. 253, 70th Cong., 1st sess.).
The latest published map is in the document last mentioned.
   Recommended modifications of project.-Under date of May 31,
1935, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for the construction of a separate down-
bound channel across Harsens Island at the Southeast Bend in St.
Clair River to a depth of 25 feet below low-water datum and a bot-
tom width of 300 feet, at an estimated cost of $1,650,000, with in-
crease of $1,000 for annual maintenance of St. Clair River, subject
to certain conditions of local cooperation (Rivers and Harbors Com-
mittee Doc. No. 53, 74th Cong., 1st sess.).
   Terminal facilities.-This improvement serves the throlugh conm-
merce between the upper and lower lakes, and it has not materially
influenced the terminal facilities at the towns along its route, which
consist only of small docks for the accommodation of local traffic.
   Operations and results during fiscal year-Regular funds-New
work--Shoals, St. Clair to Port Huron.-The U. S. derrick boat
Merganser worked in this area from July 22 to September 18 remov-
ing the wreck of an old steamer and 915 cubic yards of boulders pro-
jecting above grade from areas not covered by contract operations.
   Roberts Landing Shoal.-U. S. seagoing hopper dredge Burton
completed removal of this shoal during the period from October 5
"to October 10, removing 34,496 cubic yards, bin measure.
   Maintenance.-The up-bound channel east of Stag Island was
swept during the period September 29 and October 27, 1936. About
40 strikes extending above the 21-foot grade were discovered.
   The costs during the fiscal year were distributed as follows:
Regular funds,   new work__-------------------            ---              $26, 727. 90
Regular funds,   maintenance_______-------------------                       2, 343. 73

       Total, new work and maintenance_----          _______________   _    29, 071. 63
  The total expenditures were $28,816.46.
  Condition at end of fiscal year.-The existing project, exclusive of
compensating works, has been completed. The following table gives
project depths, controlling depths, widths, and lengths of the sev-
eral channels covered by the project, at the close of the fiscal year:
               RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                       1299

                Name of channel                          Project     Control-   Minimum         Length of     Percentage
                                                         depth     ling depth    width           channel       complete

                                                          Feet        Feet         Feet           Feet
Foot of Lake Huron-----------------------_                  26.0        24.9           800        25, 000               100
Port Huron Middle Ground ............-----------------      25.0        25.0         1,000          8,000               100
Shoals, Port Huron to Marysville--...--..--.                25.0        25.0         1,000         15, 000              100
Shoals, Marysville to Stag Island .------------             25.0         25.0           1,000       8,000               100
Stag Island, East Channel-----------------     20.0                      20.0             450      15, 000              100
Shoals, Stag Island' to St:Clair-------------- 25. 0                     25.0           1,000      28, 000        (1)
St. Clair Middle  Ground-------------------    25.0                      25.0             900       4,500               100
Marine City Shoal_------------------------25.0                           25.0           1,000       5, 800              100
Shoals, Michigan Salt Works to Roberts
  Landing -------------------------------      25.0                      25.0           1,000      18, 000              100
Head of Russell Island Shoal---------------_   25. 0                     24.5           1,000       5,500               100
Grand Pointe to Squirrel Island Shoals-__.     25.0                      25.0             600      15,000               100
Southeast Bend from Harsens Island Range
  Light No. 17a to Light No. 5-       -     -  25.0                      25.0            600         000
                                                                                                   18,                  100
Shoals from Light No. 5 to St. Clair Flats
            ---------------------------------
  Canal........         .........              25.0                      25.0            600       10, 000              100

  1 Completed Sept. 18, 1936.

    The costs have been as follows:
Regular funds :
    New work---------------------------------------------                                           $1,441, 277. 56
    Maintenance---------------------------       --------                                              441, 602.32

      Total -------------------------------------------------                                        1, 882, 879. 88
Public Works funds, new work ...-------                                                              1, 671, 659. 55
Emergency Relief funds, new work---------------------------                                              49, 395. 12

          Total, all funds-__----------------------                                                  3,603,934. 55
    The total expenditures were as follows:
Regular funds ----------------------------------------------                                        $1,882, 808. 12
Public Works funds_                     ----------                                                   1, 671, 659. 55
Emergency Relief Act funds _____                              ___--------------------                        49, 395. 12

         Total, all funds---___------                __--------------------                          3, 603, 862. 79
   Proposed operations.-The balance unexpended at the end of the
fiscal year ($8,683.54) plus an allotment of $18,600 made July 20,
1937, and an additional allotment of $250,000 made July 27, 1937, less
$5,900 revoked in July 1937, a net amount of $271,383.54, will be
applied as follows:
Regular funds: Accounts payable June 30, 1937--------------------     $71.76
New work: Constructing two compensating weirs at lower end of
  site selected for compensating work, in St. Clair River at Port
  Huron, by contract, July to November 1938-------------------- 250, 000. 00
Maintenance :
     Channel sweeping and removal of obstructions in up-bound
       channel east of Stag Island, August and September 1937-    15, 000. 00
    Channel surveys and contingencies_---------      __________    6, 311. 78

          Total new work and maintenance-------------------------                                        271, 383. 54
  The large commerce served by the channel demands that full project
dimensions be maintained. To accomplish this, the sum of $35,000
can be profitably expended during the fiscal year ending June 30,
1939, as follows:
Maintenance :
    Dredging in upper river opposite Black River and at Marine City
      by United States hopper dredge, June 1939-----------$21,                                                      000
    Channel sweeping and removing obstructions, 2 months- ---------                                             10, 000
    Channel surveys and contingencies-- -------                     -                                            4, 000
         Total maintenance--------------                                 --     ----                            35, 000
1300              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                   Cost and financial summary
Cost of new work to June 30, 1937------------------------                                                           $3, 162, 332. 23
Cost of maintenance to June 30, 1937----------_-------                                                                  441, 602, 32

     Total cost of permanent work to June 30, 1937----- --  3, 603, 934. 55
Minus accounts payable June 30, 1937-------------------------        71. 76
     Net total expenditures- -----     _____________________
Unexpended balance June 30, 1937------- ----------           __
                                                                                                                    13, 603,8, 683.
                                                                                                                               862. 79
                                                                                                                                    54
            Total amount appropriated to June 30, 1937- --                                          _______          3, 612, 546. 33

    Fiscal year ending              e 30               1933              1934              1935            1936              1937


Cost of new work--------------................       $56, 083.85     $522, 986. 27 $1, 106, 943. 22     $620, 192. 11  $26, 727. 90
Cost of maintenance--...---....--                  ---------     ----------------------------             ------------- 2, 343. 73
        Total cost,----------------                   56, 083. 85     522, 986. 27    1, 106, 943. 22    620, 192. 11        29, 071. 63

Total expended                ..----------------      28, 349. 74     508, 692. 03    1, 016, 550. 01    746, 520. 60        28, 816. 46
Allotted.------            .--------------- 228, 437. 20            1, 467, 121. 62     669, 500. 00    -46, 604, 88         18, 159. 55


Balance unexpended July 1, 1936 ___                                     ----
                                                                      __-____           ________                        $19, 340. 45
Amount allotted from War Department Appropriation Act ap-
proved July 14, 1932_ ____50,                                                                                               000. 00
      Amount to be accounted for- ----_______-         -__      ___--                                                    69, 340. 45
Deductions on account of revocation of allotment --------------                                                          31, 840. 45
      Net amount to be accounted for _____ -                                                 -            ___-
                                                                                                        -__              37, 500. 00
Gross amount expended_--       __--   ____                                               __-____                         28, 816. 46
      Balance unexpended June 30, 1937---__-- --         --                                                    --         8, 683. 54
Outstanding liabilities June 30, 1937___----------- ----                                                                      71. 76
    Balance available June 30, 1937_    -------------                                                          ------     8, 611. 78
Amount allotted during July 1937--___-----
                                       ----------                                                          -            268, 600. 00
     Balance available for fiscal year 1938                                                                             277, 211. 78
Amount (estimated) required to be appropriated for completion
of existing project -----------------------------------                                                             2, 650, 000. 00,
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 3___ - ____ -             ___                                                            35, 000. 00
   1 Includes $1,671,659.55, Public Works funds.
   2 Includes $5,900 revoked in July 1937.
   8 Exclusive of available funds.


                              4. CHANNELS IN LAKE ST. CLAIR, MICH.

   Location.-Lake St. Clair is the smallest of the Great Lakes.
 (See U. S. Lake Survey Chart No. 42.)
   Previous projects.-River and Harbor Acts of August 30, 1852,
March 2, 1867, and March 3, 1873. The total amount expended on,
and the total cost of the original and modified projects (including
the middle channel), prior to the commencement of operations un-
der the existing project in 1886, was $656,060. In addition $235,346.42
was expended for operation and care of the St. Clair Flats Canal
between 1881 and 1917 under the provision of the permanent in-
definite appropriation for such purposes. For further details see
page 2882, Annual Report for 1896, and pages 1957-1958, Annual
Report for 1915.
   Existing project.-This provides for a channel 700 feet wide and
25 feet deep from the mouth of the South Channel of the St. Clair
         RIVERS AND HARBORS-DETROIT, MICH., DISTRICT               1301
River to the open channel in Lake St. Clair, thence increasing to
800 feet width for the same depth in a length of about 2 miles, and
maintaining such channel dimensions across Lake St. Clair to head
of Detroit River; and for the construction of a stone riprapped
earth dike, 7,221 feet long, on the east side of the mouth of the
South Channel of St. Clair River.
   The project depth is referred to low-water datum for Lake St.
Clair, which is 573.5 feet above mean tide at New York. As measured
by monthly mean levels, the water may rise and fall during the
navigation season each year as much as 1.4 feet. During the past 26
navigation seasons the difference between the hig lst         and lowest
monthly mean level has been about 4.1 feet. Occa nally fluctua-
tions due to winds of high velocity may be as much as 1 foot in 6
hours.
   The estimate of cost for new work, revised in 1935, was $4,902,500,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following River and
Harbor Acts:
   The act of August 5, 1886, provided for two dikes (Annual Report
for 1885, p. 2159); act of July 13, 1892, provided for the deepen-
ing of the canal and for dredging the channel at Grosse Pointe
 (H. Doc. No. 207, 51st Cong., 2d sess.) ; act of June 13, 1902, provided
for a second canal for down-bound vessels (H. Doc. No. 234, 56th
Cong., 2d sess.); act of March 2, 1919, provided for a 21-foot depth
in the Grosse Pointe Channel for a length of about 51/4 miles (H.
Doc. No. 188, 65th Cong., 1st sess.); act of July 3, 1930, provided for
a 25-foot depth through the canals and the channel through Lake
St. Clair (H. Doc. No. 253, 70th Cong., 1st sess.), and the Public
Works Administration, September 6, 1933, and the act of August 30,
1935, provided for the removal of the center dike and widening the
channel to 700 feet (Rivers and Harbors Committee Doc. No. 3, 72d
Cong. 1st sess.).
   The latest published maps are in House Document No. 253, Sev-
entieth Congress, first session, and Rivers and Harbors Committee
Document No. 3, Seventy-second Congress, first session.
   Terminal facilities.-None.
   Operations and results during fiscal year-New work.--U. S. hop-
per dredge Burton worked in the channel in midlake from July 20
to September 30, 1936, removing a total of 679,049 cubic yards, bin
measure.
   Maintenance.-A sounding survey was made over the upper 41/2
miles of channel and in midlake during May and June 1937.
   The costs during the fiscal year were $54,925.19 for new work and
$5,626.42 for maintenance, a total of $60,551.61. The total expendi-
tures were $58,597.63. All regular funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936. The construction of the easterly dike was completed
in 1892, the removal of the center dike in 1934 and the dredging in
1936. The dike is in fair condition. Shoaling in the St. Clair Flats
canal has reduced the project depth to about 23.0 feet for a distance
of about 1,500 feet near the east channel line.
   The easterly one-half of the lower 5 miles of channel has a con-
trolling depth of 24.7 feet at present low water datum. Project
depths are available throughout the remainder of the project.
1302            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The costs have been as follows:
Regular funds:
   New work---------------------------------------------     $2,528,126.90
   Maintenance ---------------------------------------------    856, 964.69

      Total, new work and maintenance________ --                                   _____--
                                                                                      --       3, 385, 091. 59
Public Works funds, new work_________________-                                     -___________1, 008, 595.07

        Total, all funds-___ _---____----------                                                     4, 393, 686. 66
   The total expenditures were regular funds, $3,382,163.10, and
Public Works funds $1,008,595.07, a total of $4,390,758.17.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $2,928.49, plus an allotment of $35,000 made July 20,
1937, a total of $37,928.49 will be applied as follows:
Regular funds: Accounts payable June 30, 1937________ -___     ____ $2, 928. 49
Maintenance :
    Dredging by United States hopper dredge at head of lake, 11/4
      months, August, September 1937__--------------------------- 25;, 000. 00
    Channel sweeping, surveys, and contingencies1___1-__---- -     10,000.00

         Total ----------------------------------------------------                                      37, 928. 4
  To maintain full project dimensions in this important section of
the through channels, the sum of $20,000 can be profitably expended
during the fiscal year of 1939, in dredging the channel by United
States hopper dredge.
                                     Cost and financial summary

Cost of new work to June 30, 1937 ---------------------------                                     $4, 192, 781. 97
Cost of maintenance to June 30, 1937--------------------------                                    2 1, 092, 311.11



      Total cost of permanent work to June 30, 1937 _-__- ---                                       5, 285, 093. 08
Minus accounts payable June 30, 1937 _____------------2,                                                    928. 49

     Net total expenditures_________________________                                           125,     282, 164. 59
Unexpended balance June 30, 1937---   ----------------------                                              2, 928. 49

        Total amount appropriated to June 30, 1937------------                                 12   5, 285, 093. 08

   Fiscal year ending June 30           1933            1934                1935           1936             1937


Cost of new work--..........          $95, 271. 26   $927, 251. 53   $341, 115. 16      $207, 878.83       $54, 925. 19
Cost of maintenance_ _----------        1, 988. 64      1, 718. 71         396. 44            373. 76        5, 626. 42

      Total cost .---------------- 97, 259. 90       928, 970. 24     341, 511. 60       208, 252. 59       60, 551. 61

Total expended_----------------        90, 073. 12    839, 573. 43    417, 100. 07       231, 273. 11       58, 597. 63

Allotted__ ..     ..   .   -.   --    712, 331. 58    845, 569.95    -16,     460. 35     81, 000. 00       12, 295. 07


Balance unexpended July 1, 1936_-------------------------------- $49, 231. 05
Amount allotted from War Department Appropriation Act approved
Apr. 9, 1.935-------  ------------------------------             13, 000. 00

     Amount to be accounted for             -------------                                                62, 231. 05
Deductions on account of revocation of allotment ----------------                                           704. 93

      Net amount to be accounted for-__----____--            -           ___-                           61, 526. 12
Gross amount expended                  _----------------------------------                              58, 597. 63
         Balance unexpended June 30, 1937_ _--------------                                                2, 928. 49
   1 Includes $1,008,595.07 Public Works funds.
  2Includes $235,346.42 for operating and care from 1881 to 1917 under the permanent
indefinite appropriation.
           RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                             1303
Outstanding liabilities June 30, 1937 __-----------------__                    $2, 928. 49

Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937---------__          ___---------------------            35,000. 00
Balance available for fiscal year 1938_------------------------            -   35, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance ---------
                              "_      _ .._----------             --------     20, 000. 00
  8Exclusive   of available funds.

                            5.   DETROIT RIVER,        MICH.

   Location.-This river connects Lakes St. Clair and Erie. (See
U. S. Lake Survey Chart No. 41.)
   Previous projects.-Authorized by River and Harbor Acts of June
23, 1874, July 5, 1884, August 5, 1886, August 11, 1888, July 13,
1892, and March 3, 1899. The total amount expended was $2,097,-
254. For further details see page 1958 of Annual Report for 1915.
   Existing project.-This provides for a two-way channel 25 feet
deep and 800 feet wide through shoals at head of river, 26 feet deep
and 800 feet wide through Fighting Island Channel, and 26 feet
deep and 600 feet wide through Ballards Reef north of junction
with Livingstone Channel; for a down-bound channel, known as
Livingstone Channel, west of Bois Blanc Island, 26 feet deep and
at least 450 feet wide from its upper end to opposite Bar Point,
thence 26 feet deep and 800 feet wide to lower junction with Am-
herstburg Channel, thence 26 feet deep and 1,200 feet wide to the
26-foot contour in Lake Erie, passing to the east of Detroit River
Lighthouse, the lower section, 1,200 feet wide, being used for both
up- and down-bound traffic; for an up-bound channel known as the
Amherstburg Channel, 21 feet deep and at least 600 feet wide from
the lower junction with Livingstone Channel passing on the east
side of Bois Blanc Island to the head of Livingstone Channel; for
an auxiliary down-bound channel, 22 feet deep and 800 feet wide,
passing to the west of Detroit River Light; for a dike on the west
bank of the rock cut through Livingstone Channel to ameliorate
cross currents; for a compensating waste bank between Livingstone
and Amherstburg Channels at their north junction; for improv-
ing channels to Wyandotte by removing shoal at head of Grosse
Isle and by dredging through the Middle Ground opposite the head
of Fighting Island; and for improving a channel west of Grosse
Isle. 21 feet deep and 250 feet wide, extending from deep water
near the head of the island to a point 1,700 feet below the lower
Grosse Isle Bridge, ending in a turning basin of the same depth
and 17 acres in area.
1304           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The following table shows the characteristic features of the exist-
ing project:
                                                                                Used by                                   Project da-
                                                Length     Distance            up-bound           Project       Pr        turn planes
            Name of channel                        of        from               or down-                        Project      above
                                                channel     mouth                bound            width         depth     mean tide,
                                                                                 vessels                                  New York

                                                 Feet         Miles                                Feet          Feet        Feet
Shoals at head of Detroit River.....             37, 000               23      Both......                 800        25   573.3-572. 8
Fighting Island Channel-----------...........    24, 800               11     .... do ..                  800        26         571. 7
Ballards Reef Channel (north of
junction with Livingstone Chan-
  nel)....--------------------------13, 000                             8 _-__ do...                 600             26        571.25
Livingstone Chanel__ ...-....      -  36, 800                           1 Down ..               450-800              26 571. 25-570. 5
Bar Point Channel---____----____      12, 300 .........                    Both.....          800-1, 200             26         570. 5
Channel passing east of Detroit
River Light___--24,                                000     ........        ....   do ..-             1, 200         26         570. 5
Ballards Reef Channel (south of junc-
tion with Livingstone Channel)_.                 5, 700            7 Up....                              600        21 571. 25-571.0
Amherstburg Channel_ ___________                 36, 000   ...._-----------do                             600        21 571.0-570. 5
Channel passing west of Detroit
  River Light__ _--------             - 21, 000            ....-..          -Down ..                      800        22         570. 5
Wyandotte Channel-_----...----. 2, 400                                 15    Both .                       300        21         571.8
Grosse Isle Shoal_        _--___-----       600                        13    Local ....     ...     ...              20         571.8
Channel west of Grosse Isle       ---------
                                        18, 800                         6    __. _do ..                   250        21 571. 0 -571. 6


   The project depths are referred to local low-water datum planes
which correspond to low-water datums for Lakes St. Clair and
Erie, and are taken at 573.5 and 570.5 feet, respectively, above mean
tide level at New York.
   Each year during the navigation season the river rises and falls
about 2 feet as measured by the monthly mean levels. In the past
75 years the difference between the highest and lowest monthly mean
levels during the navigation season has been about 5 feet. Occa-
sional fluctuations in depths of several feet, produced by high east-
erly or westerly winds, respectively, raise or lower the water level at
the west end of Lake Erie, and similarly affect the level of the lower
Detroit River; such changes have been as much as 6 feet within 8
hours.
   The estimate of cost for new work, revised in 1937, exclusive of
amounts expended on previous projects, is $22,128,000. The latest
(1937) approved estimate for annual cost of maintenance is $43,400.
   The existing project was authorized by the following river and
harbor acts: The acts of June 13, 1902, March 3, 1905, and June 25,
1910, provided for the Amherstburg Channel and removal of Grosse
Isle Shoal (H. Docs. Nos. 712, 56th Cong., 1st sess., and 40, 58th
Cong., 3d sess.); act of March 4, 1913, provided for the Fighting
Island Channel (H. Doc. No. 17, 62d Cong., 1st sess.); acts of
March 2, 1907, June 25, 1910, March 2, 1919, provided for the Liv-
ingstone Channel (H. Docs. Nos. 266, 59th Cong., 2d sess.; 676, 61st
Cong., 2d sess.; and 322, 65th Cong., 1st sess.); act of July 3, 1930,
provided for channel depths of 25 and 26 feet (H. Doc. No. 253,
70th Cong., 1st sess.); the Public Works Administration, September
6, 1933, and act of August 30, 1935, provided for a channel to Wyan-
dotte, 21 feet deep and 300 feet wide, through the Middle Ground
opposite the head of Fighting Island (Rivers and Harbors Com-
mittee Document No. 1, 72d Cong., 1st sess.) ; act of August 26, 1937,
provided for the channel and turning basin west of Grosse Isle
 (H. Dec. No. 205, 75th Cong., 1st sess.). The latest published maps
are in the last-mentioned document, House Document No. 253, Sev-
         RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                 1305
entieth Congress, first session, and House Document No. 205, Seventy-
fifth Congress, first session.
    Local cooperation.-The act of August 26, 1937, in authorizing the
construction of the channel and turning basin west of Grosse Isle,
requires local interests to furnish assurances satisfactory to the Secre-
tary of War that they will provide terminal facilities and depths
adjacent to such facilities sufficient for the adequate utilization of
such channel and turning basin. Such requirement has not been
complied with.
    Terminal facilities. Within the limits of the port of Detroit are
more than 8.4 linear miles of docks fronting on the river, and the
appliances for handling freight are adequate, except for the channel
west of Grosse Isle. A number of docks are owned by railroads and
large manufacturing corporations over which no freight is received
except for their own use. Other docks are owned by steamship lines,
where preference is given to their own vessels. There are, however,
still other docks that are open to the use of all vessels upon equal
terms, including one with a terminal warehouse.
    Operations and results during fiscal year-Regular funds, new
work.-Contract operations were continued on the rock section of
the Ballards Reef Channel (8,540 feet long). The work was com-
pleted August 18, 1936; the total quantity of material removed dur-
ing the fiscal year amounted to 31,542 cubic yards, place measure.
    Contract work for deepening the rock portion of the Livingstone
Channel was completed August 25, 1936. The total quantity of
material removed during the fiscal year amounted to 86,826 cubic
yards, place measure. The total quantity removed under the con-
tract was 2,043,359 cubic yards, full rate, and 496,747 cubic yards,
one-half rate material.
    Contract operations were continued on the construction of the
Sugar Island compensating dike. The work was completed October
26, 1936; material in amount of 71,127 cubic yards, place measure,
was placed during the fiscal year.
   A contract was awarded for the removal of about 132,700 square
feet of rock shoals in Livingstone Channel near the Bar Point
Lightship. Work under the contract was commenced July 16 and
completed September 2, 1936.
   Dredging operations by United States seagoing hopper dredges
were continued for deepening and widening the portion (about
17,500 feet in length) of the channel to Lake Erie passing east of
Detroit River Lighthouse. Material in amount of 1,199,228 cubic
yards, bin measure, was removed during the fiscal year.
   The U. S. derrick boat Merganser worked July 17, 1936 on removal
Fof obstructions from the channel above Ballards Reef.
   Maintenance: The U. S. derrick boat Merganser continued clean-
up operations to July 15, 1936, in the Amherstburg Channel. Mate-
rial in amount of 85 cubic yards, scow measure, was removed during
the fiscal year.
   The rock sections of the Livingstone and Ballards Reef Channels
were swept during April and May 1937.
1306         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The costs during the fiscal year were distributed as follows:
Regular funds:
   New work-----------------------------------------------                                               $486, 756. 71
   Maintenance---------------     -----------------------                                                  16, 341.35

        Total, new work and maintenance ____                                     ______        ___---      503,098. 06
  The expenditures amounted to $801,808.64, of which $753,423.35
was from regular funds and $48,385 29 from Public Works funds.
  Condition at end of fiscal year.-The existing project as a whole is
about 93 percent completed. The work remaining to be done is the
improvement of the channel west of Grosse Isle, authorized by the
River and Harbor Act of August 26, 1937. The work already
done has consisted of dredging, rock excavation, and the construction
of dikes and compensating works. The dikes and compensating
works are in good condition. The following table gives project
depths, controlling depths, widths, lengths, and percentage of com-
pletion of the several channels covered by the project at the close
of the fiscal year:

                                         Length         Mini-    Project         Control-
       Name of channel                     of           mum      Pret             ling       Percentage of completion
                                         channel        width    depth           depth


                                          Feet          Feet      Feet            Feet
Shoals at head of Detroit River__ 37, 000                  800        25            24.7    Completed in 1935.
Fighting Island Channel ..... _   24, 800                  800        26            26. 0   Completed in 1933.
Ballards Reef Channel (north of   13, 000                  600        26            26. 0   Completed Aug. 18, 1936.
  junction with     Livingstone
Channel).
Livingstone Channel--..-......
                         -      36,800                     450        26            24.4    Completed Sept. 2, 1936.
Bar Point Channel-------------12, 300                      800        26            25. 0   Completed June 26, 1936
Channel passing east of Detroit 24, 000                  1,200        26            24. 5   85.
  River Light.
Ballards Reef Channel (south of            5, 700          600           21         19. 8   Completed in 1914.
junction with Livingstone
  Channel).
Amherstburg Channel _ _ _ _               36,000           600           21         19. 4   Completed in 1912.
Channel passing west of Detroit           21,000           800           22         20.1    Completed in 1929.
River Light.
Wyandotte Channel-------
                    ...                     2,400          300           21         21. 0   Completed in 1933.
Grosse Isle Shoal__  .    .          -        600   .    . ..            20         19.7    Completed in 1904.
Channel west of Grosse Isle .-
                            .              18,800          250           21         10.0    0.


   The costs have been as follows:
Regular funds:
   New work--------------------------------------------_                                            $18, 884, 619. 62
    Maintenance-_____________________                                                                    194, 819. 93

         Total--------------------                                   ---------                          19, 079, 439. 55
Public Works funds: New work________________-----------1, 523, 580. 83
        Total, all funds_____________------                                                             20, 603, 020. 38
   The total expenditures were $20,567,722.54, of which $19,037,034.04
was from regular funds and $1,530,688.50 from Public Works funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $74,719.67 (excluding $3,700 NIRA funds held for liqui-
dated damages on contract), plus allotments of $145,000 for new
work and $48,400 for maintenance, a total of $268,119.67, will be
applied as follows:
Regular funds: Accounts payable June 30, .1937-_--------------
                                               _$44,                077. 60
New work: Completion of dredging by United States hopper
  dredges in channel east of Detroit River Light, July through
  September, 1937, including sweeping of channel and removal
  of obstructions__-- ------------
                        _____________.-                        145, 000. 00
                RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                  1307
Maintenance :
    Dredging by United States hopper dredge in chan-
      nel west of Detroit River Light, 1 month, June
      1938--------------
           ____________      _______$21,                                                                 000. 00
        ,Clean-up
              of Amherstburg Channel by hired plant,
      July 19 to November 30, 1937__________----         40,                                             000. 00
    Sweeping and removing obstructions in Livingstone
      and Ballards Reef Channels, May-June 1938___ 12,                                                   000. 00
    Engineering, surveys, and contingencies_---- ---  -6,                                                042. 07
                                                                                                                        $79, 042. 07

          Total, all work-----------------------------------------                                                      268,119.67
  The channel west of Grosse Isle, provided for in the project, should
be dredged under contract. The lower Detroit River forms a part
of the chain of improved through channels and, because of the rock-
bottom conditions of a large part of the channel, together with severe
fluctuations of water levels, requires regular sweeping and mainte-
nance.           It is proposed to restore the Amherstburg Channel to full
project dimensions by Government plant and hired labor. The funds
that can be profitably expended during the fiscal year ending June
30, 1939 ($1,080,000) will be applied about as follows:
New work: For commencement of work of dredging channel west
  of Grosse Isle, 21 feet deep and 250 feet wide, with a turning
  basin at its lower end--_-_-_-                                  $1, 000, 000
Maintenance :
    Removing rock areas to project depth in Amherstburg
      Channel by United States derrick boat, 8 months,
      fiscal year 1939-------------------------     ---  $50, 000
    Sweeping rock sections of Livingstone, Amherstburg,
          and Ballards Reef Channels-_            ------                                                  15, 000
        Engineering, surveys, and contingencies --------------                                            15, 000
                                                                                                                         80. 000. 00
                                                                                                                           ,    000
                                                                                                                                .080,
           Total, new work and maintenance _____                                                                         1,9080,9000

                                                Cost and financial summary

Cost of new work to June 30, 1937_________________________                                                   1$22, 512, 562. 12
Cost of maintenance to June 30, 1937------------------------                                                       194, 819. 93
      Total cost of permanent work to June 30, 1937________                                                       22, 707, 382. 05
Undistributed costs June 30, 1937__________________________                                                             1, 672. 09
     Net total cost to June 30, 1937________________________                                                      22, 709, 054. 14
Minus accounts payable June 30, 1937 ___________________                                                               44. 077.60
     Net total expenditures __      __________                                                                    22, 664, 976. 54
Unexpended balance June 30, 1937_________________________                                                              78, 419. 67
            Total amount appropriated to June 30, 1937____________                                            1222, 743, 396. 21

     Fiscal year ending June 30                     1933              1934              1935               1936              1937


Cost of new work_ _
Cost of maintenance-- _
                                            -    $868, 004.38 $1, 702, 694. 49 $2, 456, 893.09
                                                    9, 014. 05     14, 285. 31      12, 527. 77
                                                                                                     1$1,792,626.  41
                                                                                                           4, 407. 79
                                                                                                                           $486, 756. 71
                                                                                                                             16, 341. 35
         Total cost--...-------------....         877, 018. 43   1, 716, 979. 80   2, 469, 420. 86    1, 797, 034. 20       503, 098. 06
Total expended_.... -----           -   -         703, 811. 01   1,596,663.97      1. 986, 558. 02    2, 097, 452. 27       801,808.64
Allotted .._______.------------_.               1,103, 636.91    4, 768,562.74       762, 193.01         419, 000. 00         1, 388. 5?

    1 Includes $1,530,688.50   Public Works funds for new work.
    2   Includes $1,535,000 Public Works funds.
1308         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936_          -_____     ---                                    $878, 839. 81
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936- ------- ___      $15, 000.00
Amount allotted from National Industrial Recovery
  Appropriation Act, June 16, 1933 --------      -___ 6, 882. 67
                                                                                               21, 882.67

      Amount to be accounted for_____                                                         900, 722. 48
Deductions on account of revocation of allotment _____.......                                  20, 494. 17

      Net amount to be accounted for ....                         ___                         880, 228. 31
Gross amount expended___                                                                      801, 808. 64
      Balance unexpended June 30, 1937 ........                                                78, 419. 67
Outstanding liabilities June 30, 1937 ----      --- $44, 077. 60
Amount covered by uncompleted contracts--------- 59, 287. 08
                                                                                              103, 364. 68

     Balance available June 30, 1937__________-----_                                        -24, 945. 01
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_-------_____---------------_                                          193, 400. 00
        Balance available for fiscal year 1938 ------------------                            168, 454. 99

Amount (estimated) required to be appropriated for comple-
                                  -- - -- -- -- -- - -- -- -- -- - -- -- --
tion of existing project - - - -                                                         1, 575, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:   -  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For new work 3                                                                            1, 000, 000. 00
                                       - - - - - - - - - - - - - - - - - - - - - - -- - -- -
   For maintenance - - - - - - - - -                                                            8 0, 000. 00

         Total -------------------------------------------                                 1, 080, 000. 00
  SExclusive of available funds.

                              6. CHEBOYGAN HARBOR, MICH.

   Location.-This harbor is located on the lower reach of the Che-
boygan River and is about 100 miles distant from Alpena, Mich.,
in a northwesterly direction. The river, which is 51/2 miles long, has
its source in Mullet Lake, from which it flows in a northerly direc-
tion, emptying into the Straits of Mackinac, Lake Huron. The
improved portion is about 11/2 miles in length. (See U. S. Lake
Survey Chart No. 5.)
   Previous project.-The original project was authorized by the
River and Harbor Act of March 3, 1871, and modified by River and
Harbor Act of June 14, 1880. The total costs and expenditures prior
to commencement of operations under the existing project in 1896
were $129,828.24, all on new work. For further details of previous
projects see page 1956 of Annual Report for 1915.
   Existing project.-This provides for a channel 181/2 feet deep and
200 feet wide from the Straits of Mackinac to the outer end of the
west pier, and between lines parallel to and 25 feet from the docks
from that point to the State Road Bridge, and thence 81/ feet deep
and 60 feet wide from this bridge to the lock in the Cheboygan
River, and for a turning basin 15 feet deep, 400 feet wide, and 420
to 670 feet long, on the east side of the existing project channel just
below First Street. The length of the section included in the project
is 11,720 feet, of which 6,000 feet are in the straits.
         RIVERS AND HARBORS-DETROIT,               MICH., DISTRICT     1309
   The project depths are referred to low water datum for Lake
Huron, which is 578.5 feet above mean tide level at New York. Each
year the level of the river rises and falls about 3 feet. From day to
day the level changes somewhat, due to wind and barometric pressure,
such changes sometimes amounting to a foot or more.
   .The estimate of cost for new work, revised in 1937, is $122,800,
exclusive of amounts expended under previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $6,000.
   The existing project was adopted by the following river and harbor
acts: The act of June 3, 1896, provided for the 181/2 -foot channel
 (Annual Report for 1895, p. 2823); the act of March 2, 1907, provided
for the 81/2 -foot channel (H. Doc. No. 537, 59th Cong., 1st sess.) ; and
the act of August 26, 1937, provided for the turning basin. (H. Doc.
No. 134, 75th Cong., 1st sess.)
    The latest published map is in the last-mentioned document.
    Local cooperation.-The act of August 26, 1937, in authorizing the
construction of the turning basin, requires local interests to furnish,
free of cost to the United States, necessary rights-of-way and suitable
spoil-disposal areas for new work and for subsequent maintenance as
required, and to release the United States from all claims for damages
attributable to the construction of such turning basin. Such require-
ments have not been complied with.
    Terminal facilities.-The harbor has one dock of about 1,000 feet
length, which is privately owned but open to all vessels upon equal
terms. There are also several other docks of less than 100 feet length
which are privately owned and used. These terminal facilities are
considered adequate for existing commerce.
    Operations and results during fiscal year.--None.
    Condition at end of fiscal year.-The existing project is 57 percent
completed. The outer end of the old slab pier on the western side of
the entrance was riprapped in 1921. All work has been done except
dredging of the turning basin authorized by the River and Harbor
Act of August 26, 1937. The controlling depths, as shown by an
examination made during June 1936, were as follows: 5.5 feet for the
section above the State road bridge; 81/2 feet for a distance of about
1,400 feet below the bridge, thence 18 feet over a central width of
about 120 feet to the Straits of Mackinac. The upstream limit of the
improvement is at the lock, about 8,500 feet above the mouth. Light-
draft boats navigate a farther distance of 30 miles in a waterway
improved by local industries under a State law.
    The costs under the existing project have amounted to $69,783.81
for new work and $36,451.54 for maintenance, a total of $106,235.35.
The total expenditures were $106.235.35.
    Proposed operations.-No funds are available and no work is pro-
posed for the fiscal year 1938.
    The turning basin provided for in the project should be constructed.
Considerable shoaling has occurred in the river below State road
bridge and along the sides of the lake channel. The funds that can
be profitably expended during the fiscal year ending June 30, 1939
  ($130,000), will be applied as follows:
New work: Dredging the turning basin at the foot of 1st St. by
contract                          __
     cotat--------------------------------------               $53,000
                                                                   00
Maintenance: Dredging under contract------________
                                  ..                             -_    77, 000
      Total new work and maintenance---------_-_                      130, 000
1310     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                         Cost and financial summary
Cost of new work to June 30, 1937___________________________      $199, 612.   05
Cost of maintenance to June 30, 1937_________________________       36, 451.   54
       Total cost of permanent work to June 30, 1937----    _____ 236, 063.    59
Net total expenditures_------_---_____-_________                   236, 063.   59
Total amount appropriated to June 30, 1937---------------------236,     063.   59
Amount (estimated) required to be appropriated for completion of
  existing project_______-- _____-----____                          53, 000.   00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
    For new work---------------------------------------------        53, 000. 00
   For maintenance--------------------------------------------       77, 000. 00
      Total---------------------------------------------------      130, 000. 00
                        7. ALPENA HARBOR, MICH.

   Location.--Located on the northwest shore of Thunder Bay, Lake
Huron. The river has its source in Montmorency and Alpena Coun-
ties, Mich., and empties into Thunder Bay. (See U. S. Lake Survey
Chart No. 5.)
   Previous projects.-River and Harbor Acts of August 14, 1876,
and August 2, 1882. The total amount expencded was $18,888.70.
For further details see page 1957 of Annual Report for 1915.
   Existing project.-This provides for a channel 21 feet deep, from
that depth in Thunder Bay to a point 2,500 feet lakeward of the
lighthouse; thence 181/2 feet deep to the upper end of the Fletcher
Paper Co. dock in Thunder Bay River; for channel width of 200
feet from the 21-foot contour in Thunder Bay to the outer end of
the breakwater, thence tapering to 100 feet in a distance of about
500 feet, thence 100 feet to Second Avenue Bridge and thence 75
feet for 1,600 feet, to upper limit of the improvement; and dredging
a turning basin opposite the Fletcher Paper Co. dock, 15 feet deep
and about 160,000 square feet in area; for the protection of the
channel on the south side by the construction of a rubble mound over
a length of about 600 linear feet landward from the end of the old
docks and by the construction of a rubble breakwater from the
same point lakeward for a distance of about 370 feet. The total
length of the river included in the project is 4,620 feet, and the im-
proved channel extends 7,500 feet farther into the bay beyond the
lighthouse.
   The project depth is referred to low-water datum for Lake Huron,
which is 578.5 feet above mean tide at New York. Each year the
level of Thunder Bay River rises and falls about 31/2 feet. From
day to day the level changes somewhat due to wind and barometric
pressure, such changes frequently amounting to more than a foot.
   The estimate of cost for new work, revised in 1935, was $340,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $7,500.
   The existing project was adopted by the following river and har-
bor acts: The act of September 19, 1890 (Annual Report for 1889,
p. 2288) provided for a channel depth of 161/2 feet; act of August 30,
1935 (Rivers and Harbors Committee Doc. No. 42, 72d Cong., 1st
sess.), provided for the present project dimensions of the channel; and
the act of March 2, 1919, as amnended by act of September 22, 1922,
provided for the other features (H. Doc. No. 830. 65th Cong., 2d sess.,
and River and Harbors Committee Doc. No. 1, 67th Cong., 1t sess.).
                 RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                          1311
The latest published map is in Rivers and Harbors Committee Docu-
ment No. 42, Seventy-second Congress, first session.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are docks for total lengths of about
2,000 feet on the right bank and about 2,100 feet on the left bank.
'These docks are privately owned, but about 800 feet length of that
on the right bank is open to public use on equal terms. These termi-
nal facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year--Regular. funds-New
work.-Contract dredging to deepen the channel in accordance with
the act of August 30, 1935, and to provide" a turning basin opposite
the Fletcher Paper Co. dock 15 feet deep and about 160,000 square
feet in area was commenced July 21, 1936, and completed November
19, 1936. Material in amount of 242,327 cubic yards, including
14,353 cubic yards of rock, was removed under the contract.
   The costs and expenditures during the fiscal year were $202,529.37
for new work.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937 and project dimensions are available throughout. The
rubble mound and rubble breakwater, which are in good condition,
were completed in 1924.
   The costs and expenditures under the existing project have
amounted to $309,562.04 for new work and $111,676.79 for mainte-
nance, a total of $421,238.83.
   Proposed operations.-The balance unexpended at the end of the
fiscal year ($350) is available for revocation; no funds can be profit-
ably expended during the fiscal years 1938 or 1939.
                                          Cost and financial summary

Cost of new work to June 30, 1937_--------------- ---------                                                  $328, 450. 74
Cost of maintenance to June 30, 1937--------------------------                                                111, 676. 79

           Total cost of permanent work to June 30, 1937------------440, 127. 53

Net total expenditures---------------------------------------- 440, 127.53
JUnexpended balance June 30, 1937-----------------------------      350. 00

           Total amount appropriated to June 30, 1937-------------- 440, 477. 53

          Fiscal year ending June 30                     1933         1934           1935             1936           1937


Cost of new work......-------- ------------ ----------------                 ----------- ------------             $202,529.37
Cost ofmaintenance...------------------ $18, 045. 18-
Total expended---.......-----------------------        17, 926.98 ----------------    ---------------.....         202,529.37
Allotted.........------.......----------------------   17, 923. 50 -----------------------           $190, 000      12, 879. 37


Balance unexpended July 1, 1936------------------------------ $190, 000. 00
Amount allotted from War Department Appropriation Act ap-
    proved May 15, 1936-------------------------------------                                                     12, 879. 37

       Amount to be accounted for------------------------------202,                                                 879. 37
Gross amount expended --------------------------      $202, 540. 62
Less reimbursements collected------------------------        11. 25
                                                                                                             202, 529. 37
          Balance unexpended June 30, 1937_-                                                       -350                     tO
          20196-37-pt. 1--83
1312    I EPORT OF CHIEF OF ENGINEERS, -U.       S. ARMY, 1937

                     8. SAGINAW    RIVER, MICH.

   Location.-This river is formed by the union of the Tittabawassee
and Shiawassee Rivers and discharges into the south end of Sagiiaw
Bay, Lake Huron. (See U. S. Lake Survey Chart No. 5.)
   Previous projects.--River and Harbor Acts of June 23, 1866, June
23, 1874, June 18, 1878, March 3, 1879, August 2, 1882, and August
5, 1886. The total costs and expenditures prior to the adoption of
the existing project in 1910 were $962,556.26.      (For further details
see p. 1957 of Annual Report for 1915.)
   Existing project.--This provides for a channel 181/a feet deep
and 200 feet wide from dee p water in Saginaw Bay to the Sixth
Street Bridge in Saginaw, Mich., thence 161/ feet deep to the junc-
tion with the Tittabawassee River, a distance of 27 miles; and for
a turning basin 15 feet deep by 360 feet wide, varying from 690 feet
to 420 feet in length, adjacent to the east side of the existing channel
between Court and Bristol Street Bridges. The project depth is
referred to low-water datumi:for Lake: Huron, which is taken at
578.5 feet above mean tide level at New York. Due to storms the
level of the river at its mouth rises and falls about 3 feet. Spring
freshets and excessive rains have caused an abnormal rise .of as much
as 14 feet at Saginaw. Occasionally a considerable change takes
place within a few hours, resulting from the raising or lowering of
Saginaw Bay by violent winds.
   The estimate of cost for new work, revised in 1937, is $1,627,500,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $81,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for a channel 200 feet
wide. with depths of 181/2 feet in the bay and 161/2 feet in the river
 (H. Doc. No. 740, 61st Cong., 2d sess.); the act of July 3, 1930, pro-
vided for the. present diniensions of the channel project (Rivers
and Harbors Committee Doc. No. 30, 71st Cong., 2d sess.), and the
act of August 26, 1937, provided for the turning basin (Rivers and
Harbors Committee Doc. No. 21, 75th Cong., 1st sess.). The latest
published map of the locality is in the latter document.
   Local cooperation.-The act of August 26, 1937, in authorizing the
construction of the turning basin, requires local interests to furnish,
free of cost to the United States, all necessary lands and easements
for the .turning basin and for the disposal of excavated material, and
to construct dikes satisfactory to the district engineer for confihe-
ment of material in disposal areas. Such requirements have not been
complied with. All prior requirements have been fully complied with.
   Terminal acilities.-General utility docks, all privately owned,
are located at Essexville and Bay City. The aggregate length of
these docks is about 3,000 feet. Similar docks with a total length
of about 1,500 feet are located in the upper river at Saginaw. In
addition, the Chevrolet Motor Co. operates an industrial dock about
600 feet long at Saginaw, and the Consumers Power Co. owns and
operates a dock about 1,100 feet long at Zilwaukee. Turning basins
have been constructed by the owners opposite the latter two docks.
These terminal facilities are adequate for the existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
by U. S. hopper dredge Meade from the mouth of the river to Essex-
ville and in the bay channel was in progress from August 5 to Sep-
                RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                             1313
tember 25, 1936, during which time 103,215 cubic yards, bin measure,
of material were removed.
  A maintenance survey of the entire project was commenced May
19, 1937, and continued throughout the remainder of the fiscal year.
  The total costs, all for maintenance, were $35,570.83 and the total
expenditures were $36,355.67.
   Condition at the end of fiscal year.-The existing project is about
96 percent complete. All work has been completed except dredging
of the turning basin authorized in 1937. Maintenance dredginig in
the outer end of the 181/2-foot project has provided full project depth
from Essexville to deep water in the bay. The controlling depths
above Essexville are as follows: 18.5 feet to Sixth Street in Saginaw
over a central width of about 150 feet; thence 16.5 feet to Court
Street; thence 8.0 feet to the upper end of the project.
   The costs have been $1,569,526.96 for new work and $687,010.11
for maintenance, a total of $2,256,537.07. The total expenditures
were $2,257,321.91.
  Proposed operations.--An allotment of $3,000 made June 28, 1937.,
plus an allotment of $37,000 made July 20, 1937, a total of $40,000
will be applied as follows:
Maintenance:
   Survey of the entire project, July-August 1937-                                      ---------                      $4,000
   Dredging by U. S. hopper dredge in river and in bay channel-
      1'/4 months, May-June, 1938-------------------------                                                             34,000
   Engineering, surveys and contingencies--------------                                                                 2,000
                 Total ---------------------------------------------                                                  40, 000
   The turning basin provided for in the project should be con-
structed. The channel in Saginaw River and Bay is subject to shoal-
ing, and the increasing commerce in this channel requires that full
project dimensions be maintained at all times. The funds that can
be profitably expended during the fiscal year 1939 ($108,000) will
therefore be applied as follows:
       New work: Dredging turning basin between Court and Bristol
        Streets, Saginaw, by contract-------                   ----------- $$58,000
       Maintenance: Removing shoals in channel of Saginaw River and
        Bay by U. S. hopper dredge.---------------------------              50, 000
                 Total new work and maintenance-                                ---------------------                 108, 000
                                           Cost and financial summary
Cost of new work to June 30, 1937------------------------                                                   $2,532, 083. 22
Cost of maintenance to June 30, 1937---------------------                                                      687, 010. 11
      Total cost of permanent work to June 30, 1937 ---------                                                 3, 219, 093. 33
Undistributed costs June 30, 1937-----------------------------                                                        784. 84
      Net total cost to June 30, 1937----------------------                                                    3,219, 878. 17
Net total expenditures___-______----------------,                                                                 219, 878. 17
Total amount appropriated to June 30, 1937-----    ----------                                                  3, 219, 878.17

          Fiscal year ending June 30                         1933           1934           1935           1936          1937

Cost of new work--------------------................. ... $269, 083.83
Cost of maintenance--.---- --------                         .--
                                                         ---------       $20, 164. 22 $104, 112. 63    $20, 321.37    $35, 570. 83
Total expended--------............            ..   - -549, 130. 02        19,966. 34    103,997. 62     20, 626. 28    36, 355. 67
Allotted--------------------------.........              361, 273. 44    118, 931. 77    19, 000. 00    14, 000. 00    10, 500. 00
1314       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936__ ____--_------------------                                     $25, 855.67
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936 _____----------__________---------                                          10, 500.00

       Amount to be accounted for-__--------                                 ------------        36, 355. 67
Gross amount expended -----------------------                                 $36, 365.13
Less reimibursements collected__
                               --  _---9.                                                 46
                                                                                                 36, 355. 67

Amount allotted during June and July 1937-------------------                                     40, 000. 00
Amount available for fiscal year 1938                      __40,                                     000. 00
Amount (estimated) required to be appropriated for completion
of existing project -------------------------------------                                       58, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:               - -- - - -- - - - - - - - - - - - - - --- ---- - --
   For new work 1                                                                                58, 000.00
                                                                        _
   For maintenance '--------------------_______                   __        ___                  50, 000. 00
               - - -   - - - - -- - -   -   - - - - - - - - - - - - - - - -- ----- ---- --- -
       Total                                                                                    108, 000. 00
  1 Exclusive of available funds.

  9. HARBOR OF REFUGE AT HARBOR BEACH, LAKE HURON, MICH.

   Location.-This harbor is located on the west shore of Lake Huron.
 (See U. S. Lake Survey Chart No. 5.)
   Existing project.-This provides for the formation of a harbor of
refuge protected by stone-filled timber-crib breakwaters-the main
breakwater being 4,716 feet long, the north one 1,204 feet long, .the
original north entrance, 304 feet wide, being reopened to a depth of
10 feet, and the south breakwater 1,956 feet long; for dredging the
main entrance, 600 feet wide, to a depth of 23 feet; and for dredging
an anchorage area approximately 3,000 feet long by 1,200 feet wide
to a depth of 21 feet.
   The project depths are referred to a stage 578.5 feet above mean
tide at New York. The normal elevation of the water surface in
Lake Huron varies from year to year. During each year the level is
subject to a seasonal rise and fall, the lowest stages prevailing during
winter and the highest during summer months. Such yearly changes,
measured by monthly mean levels, may be as much as 1.8 feet. Dur-
ing the past 26 navigation seasons the difference between the highest
and lowest monthly mean levels during the navigation season has
been about 4.9 feet. Occasional fluctuations, due to winds of high
velocity, may be as much as 2 feet in 8 hours.
   The estimate of cost for new work, revised in 1917, was $1,658,550.
The latest (1917) approved estimate for annual cost of maintenance
is $10,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1871, adopted the site and made pro-
vision for the harbor (Annual Report for 1873, p. 292); the act of
August 8, 1917, provided for closing the north entrance and dredging
the main entrance and the anchorage area (H. Doc. No. 1700, 64th
Cong., 2d sess.). The latest published map is in the project docu-
ment.
   The act of January 21, 1927, authorizes the Secretary of War to
remove such portion of the breakwater in the interest of sanitation,
as will not be detrimental to purposes of navigation.
           RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                            1315
   Terminal facilities.-There is but one dock about 500 feet long.
This dock is privately owned, but it is open to all vessels upon equal
terms. Terminal facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1928 at a saving of $457,951 under the estimated cost. The
work consisted in the construction of three breakwaters, the dredging
of an entrance channel, and the dredging of an anchorage area
about 72 acres in extent under the protection of the breakwaters.
The breakwaters were originally built in 1885, and since that time it
has been necessary to top them with concrete and to protect about
6,170 feet of the outer face with heavy riprap. The north entrance
was closed by rubble mound in 1920 and reopened to about 10 feet
depth in 1928. Dredging was completed in 1922.
   The harbor has controlling depths of 20.5 feet at its entrance and
about 18 feet within anchorage area, as shown by survey of 1928.
The breakwaters are in fair condition, except that riprap along lake
face of main breakwater needs repair and some fenders on harbor
face of main breakwater need replacing.
   The costs and expenditures have been $1,200,598.17 for new work
and $1,467,239.92 for maintenance, a total of $2,667,838.09.
   Proposed operations.-An allotment of $10,000 made July 20, 1937,
will be applied to a complete survey of the harbor during August
1937, and for riprap protection of the breakwater.
   No work is proposed during the fiscal year ending June 30, 1939,
and no funds can be profitably expended.
                           Cost and financial summary

Cost of new work to June 30, 1937                                      $1, 200, 598. 17
Cost of maintenance to June 30, 1937                                       467, 239. 92
                                                                        1--------------------------,

      Total cost of permanent work to June 30, 1937__________ 2, 667, 838. 09
Net total expenditures---------------------------------------2,    667, 838. 09
Total amount appropriated to June 30, 1937________________      2, 667, 838. 09
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937                                                  $1-------------------------
                                                                         0, 000
Amount available for fiscal year 1938__--________1____________-         10, 000
                            10. BLACK RIVER, MICH,.

   Location.-This river has its source in the northern part of Sani-
lac County, Mich., and empties into the St. Clair River. (See U. S.
Lake Survey Chart No. 43.)
   Previous projects.-Authorized by River and Harbor Acts of June
10, 1872, and August 11, 1888. The total expenditures and the total
costs under these projects prior to the consolidation of the projects
for Black River and mouth of Black River was $97,856.89, of which
$85,848.58 was for new work and $12,008.31 was for maintenance.
For further details see page 1441 of Annual Report for 1916.
  Existing project.-This provides for a channel 20 feet deep from
deep water in St. Clair River to the Grand Trunk Railroad bridge,
160 feet wide at the mouth, decreasing to 100 feet about 800 feet from
the mouth, thence 100 feet wide for 2,600 feet, decreasing to 75 feet
for a distance of 4,800 feet at upper end; widening to 100 feet two
bends, one at the foot of Twelfth Street, and the other below the
1316     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Grand Trunk Railroad bridge; and for a settling basin 75 feet wide
and 20 feet deep, beginning at the Grand Trunk Railroad bridge in
Port Huron and extending up-stream a distance of about 2,300 feet.
   The length of the section included in the project is 10,500 feet.
The project depth is referred to local low-water datum in the St.
Clair River at the mouth of the Black River, which is 577.5 feet above
mean tide at New York. Each year the level of the river rises and
falls from 4 to 6 feet, due to the fact that spring freshets raise the
level considerably above the normal. The level also changes from
day to day, due to winds, such changes amounting to several inches.
   The estimate of cost for new work, revised in 1935, exclusive of
amounts expended on previous projects, but including $43,000 to be
contributed by local interests, is $166,500. The latest (1935) ap-
proved estimate of annual cost of maintenance is $9,000.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the channel
from the mouth to the Grand Trunk Railroad bridge (Annual Re-
port of 1889, p. 2291); act of July 13, 1892, provided for the section
thence to Washington Avenue (no printed report); act of September
22, 1922, consolidated the projects for Black River at Port Huron
and mouth of Black River (H. Doc. No. 436, 64th Cong., 1st sess.);
and act of July 3, 1930, provided for the settling basin (H. Doc. No.
162, 71st Cong., 2d sess.). The latest published maps are in House
Document No. 436, Sixty-fourth Congress, first session, and Rivers
and Harbors Committee Document No. 54, Seventy-second Congress,
second session. The act of August 30, 1935, provided for deepening
the channel and settling basin to 20 feet, and for widening to 100
feet two bends, one at the foot of Twelfth Street, the other below the
Grand Trunk Railroad bridge (Rivers and Harbors Committee Doc.
No. 54, 72d Cong., 2d sess.).
   Local cooperation.-The act of August 30, 1935, requires local
interests to-
   1. Contribute one-half of the initial cost of the improvements.
   2. Provide all lands or easements necessary and requisite to the execution of
the project.
   3. Remove the existing Tenth Street Bridge, or replace it with a satisfactory
structure.
   4. Furnish satisfactory assurances that the United States will be protected
from all claims for damages incident to the improvements.
  None of the above requirements has been complied with.
  Terminal facilities.-There are docks on both sides of Black River,
near its mouth and between these docks and the upper limit of im-
provement there are five other docks varying in length from 100 to
500 feet. All docks are privately owned and are restricted to the
use of the owners. The present terminal facilities are considered
adequate for the existing commerce.
  Operations and results during fiscal year.-Maintenance dredging,
under contract, in the settling basin was continued to August 8, 1936.
A total of 9,164 cubic yards, place measure, were removed.
  The costs during the fiscal year were $4,853.66 and the total ex-
penditures were $6,417.30.
  Condition at end of fiscal year.-All work except that authorized
by the act of August 30, 1935, has been completed. A maintenance
survey of April 1937 shows controlling depths as follows: 17 feet
             RIVERS AND HARBORS--DETROIT, MICH., DISTRICT                                                     1317

from the mouth of the river to Seventh Street Bridge over a cen-
tral width of about 60 feet; 15 feet from Seventh Street Bridge to the
settling basin over a central iwdth of about 60 feet; 17 feet in the
settling basin for a distance of about 1,350 feet up-stream of the Grand
Trunk Railway bridge over the full width of 75 feet; thence a depth
of 12 feet over the full width to the upper end of the settling basin.
   The costs have been $54,474.29 for new work and $167,684.51 for
maintenance, a total of $222,158.80. The total expenditures were
$222,158.80.
   Proposed operations.-The balance unexpended at the end of the
fiscal year ($15.01), plus an allotment of $9,000 made July 20, 1937,
a total of $9,015.01, will be applied to maintenance dredging by
contract during the early spring of 1938..
   The commerce using this channel requires full project dimensions.
The sum of $9,000 can be profitably expended during the fiscal year
ending June 30, 1939, on maintenance dredging by contract.
   No new work is proposed during the fiscal year ending June 30,
1939. since it is believed that conditions of local cooperation will not
be fulfilled in time to permit undertaking work during that year.
                                 Cost and financial summary

Cost of new work to June 30, 1937 -------------                                               __--$140, 322. 87
Cost of maintenance to June 30, 1937___________-________                                         _    179, 692. 82

        Total cost of permanent work to June 30, 1937-------------                                    320, 015. 69

.Net total expenditures--___                              ------------                                320, 015. 69
Unexpended balance June 30, 1937                       ------------------------------                          15. 01

        Total amount appropriated to June 30, 1937--------------                                      320, 030. 70

        Fiscal year ending June 30              1933            1934              1935         1936           1937

Cost of new work---            -------------------------------------------------------
Cost of maintenance_....----------------   --$0. 25 $8, 581. 56 $5, 561. 62 $2,720. 06 $4,853. 66
Total expended_.--     ..------------------- 365.06           8,581. 56          6,185. 69      532.35        6, 417.30
Allotted----------------- ------------- -- 1, 035. 33        15, 231.91          6,500. 00...._                  ...

Balance unexpended July 1, 1936                  ---------------      -     __                           $6,432.31
Gross amount expended__ ------                    ---------------------------                             6,417.30
     Balance unexpended June 30, 1937_---  ___________________                                                 15. 01
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937----------------------------------      -                                              9, 000.00
    Balance available for fiscal year 1938_ -- ____ -         -______ 9, 015. 01
Amount (estimated) required to be appropriated for completion of
  existing    project    2___________________--56,000.                                                               00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenancel ---.-----.----                         --    ----------                  -9,     000. 00
  1 Exclusive of available funds.
  2Exclusive of $43,000 to be contributed by local interests.
                                11. CLINTON RIVER, MICH.

   Location.-This river has its source in Oakland County, Mich.,
flows in an easterly direction, and empties into Anchor Bay in the
1318    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

northwestern part of Lake St. Clair. It is about 60 miles long. (See
U. S. Lake Survey Chart No. 42.)
  Previous proajects.-The original improvement was authorized by
act of August 30, 1852, and modified by River and Harbor Acts of
July 11, 1870, and March 3, 1881. Prior to commencement of work
under the existing project, in 1886, $25,500 was expended for new
work. For further details of previous projects see page 1958 of
Annual Report for 1915.
   Existing project.-This provides for a channel 8 feet deep and 60
feet wide at the mouth, decreasing to 50 feet wide in the river from
the 8-foot contour in Lake St. Clair to and up the river to Mount
Clemens, 42,500 feet; for a pile dike 2,500 feet long to protect the
channel in Lake St. Clair; for closing the old channel and making
a cut-off at Shoemakers Bend; for closing Catfish Channel; and for
the construction of revetments as needed in the river. The length of
the section of the river included in the project is about 40,000 feet,
and in the lake about 2,500 feet.
   The project depth is referred to low-water datum for Lake St.
Clair, which is 573.5 feet above mean tide at New York. Each year
the level of the river at Mount Clemens rises and falls from 6 to 9
feet, due to spring freshets. From day to day the level changes
somewhat, due to winds, such changes occasionally amounting to over
a foot.
   The estimate of cost for new work, revised in 1889, was $34,564.
The latest (1918) approved estimate for annual cost of maintenance
is $1,500.
   The existing project was adopted by the River and Harbor Act of
August 5, 1886 (S. Doc. No. 199, 46th Cong., 2d sess., and Annual
Report for 1880, p. 2062; and H. Doc. No. 210, 48th Cong., 2d sess.,
and Annual Report for 1885, p.: 2190). The latest published map is
in the Annual Report for 1903, page 1999.
   Terminal facilities.-There is one dock of about 300 feet length
at the city of Mount Clemens, owned by that city, which is open to
all vessels upon equal terms. There are also a number of privately
owned docks, and so used, of 100 feet maximum length along the 7/2
miles of river below the city. These terminal facilities are considered
adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is completed.
No maintenance work by the Federal Government has been done on
this project since 1916. The controlling depth in the channel leading
from the bay into the river is 5 feet, as shown by the survey of 1937.
The controlling depth in the river was about 5 feet, as shown by the
last survey in 1925. The head of navigation for light-draft boats
is about 2 miles up-stream of the upper limit of the improvement.
   The costs and expenditures on the existing project have been
 $34,546.26 for new work and $41,203.80 for maintenance, a total of
$75,750.06.
   Proposed operations.-An allotment of $10,000 made July 20, 1937,
will be applied to a complete survey of the project and to restoration
of project dimensions at the mouth of the river by contract dredging
during September 1937.
   No work is proposed during the fiscal year ending June 30, 1939,
and no funds can be profitably expended.
          RIVERS AND HARBORS--DETROIT, MICH., DISTRICT                     1319
                          Cost and financial summary

Cost of new work to June 30, 1937-----------------------------       $60, 046. 26
Cost of maintenance to June 30, 1937----------     ________-----____ 41, 203. 80

      Total cost of permanent work to June 30, 1937__._              101,250.06
Net total expenditures----------       -        -----------------    101, 250. 06
      Total amount appropriated to June 30, 1937---------------101,250. 06
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_________---------------          ----------- 10, 000. 00
Amount available for fiscal year 1938-----------------------          10, 000. 00

                          12. ROUGE RIVER, MICH.

   Location.-The river rises in Oakland and Washtenaw Counties,
Mich., and empties into the Detroit River. (See U. S. Lake Survey
Chart No. 415.)
   Previous projects.-Authorized by the River and Harbor Act of
August 11, 1888 (Annual Report for 1887, pp. 2275-2278) ; joint
resolution of April 11, 1898 (H. Doc. No. 138, 55th Cong., 2d sess.,
and Annual Report for 1898, p. 2605), and the River and Harbor
Act of March 2, 1907 (H. Doc. No. 289, 59th Cong., 1st sess.). The
costs and expenditures prior to the adoption of the existing project
in 1917 were $50,082.49 for new work and $56,607.51 for mainte-
nance, a total of $106,690. For further details see page 1530 of
Annual Report for 1932.
   Existing project.-This provides for a channel 21 feet deep from
that depth in Detroit River through the Short Cut Canal to Maples
Road, with width of 400 feet at entrance, tapering to 200 feet in a
distance of 2,000 feet; thence 200 feet wide to Maples Road; for a
channel 25 feet deep from the mouth of the old channel upstream for
a distance of 1,300 feet, with a width of 240 feet at the mouth, taper-
ing to 100 feet at a distance of 800 feet from the mouth; for a channel
18 feet deep for a distance of 1,425 feet and 100 feet wide; for a
channel 21 feet deep extending from the junction of the old channel
and Short Cut Canal into the old channel to the Detroit, Toledo &
Ironton Railroad bridge, with a width of 150 feet, decreasing to 130
feet at the north end of the Peerless Portland Cement Co. wharf, and
to 100 feet at a point 300 feet north of that point, and thence 100 feet
wide to the bridge, with suitable widening at the bend opposite the
Detroit Sulphite Pulp & Paper Co. plant. The length of the im-
provement from its upper limits to Detroit River via Short Cut
Canal is about 31/2 miles and via the natural channel is about 41/2
miles.
   The project depths are referred to local low-water datum in the
Detroit River at the mouth of the Rouge River, which is 572.2 feet
above mean tide at New York. The level of this river, except during
floods, changes with the level of the Detroit River, which fluctuates
to an average extent of about 1.5 feet during the navigation season.
   The estimate of cost for new work, revised in 1935, is $820,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $26,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 11, 1888, provided for a 17-foot
section (Annual Report for 1887, pp. 2275-2278); act of August 8,
1320    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

1917, provided for the 21-foot channel via Short Cut Canal (H. Doc.
No. 2063, 64th Cong., 2d sess.); and the act of August 30, 1935, pro-
vided for the 25-foot channel at the mouth of the old channel, the,
18-foot channel, 1,425 feet in length and adjacent to the latter. and
the 21-foot channel extending from the junction of the old channel
and Short Cut Canal into the old channel to the Detroit, Toledo &
Ironton Railroad bridge (Senate committee print, 73d Cong., 2d
sess.). Prior to adoption by the act of 1935, dredging the mouth of
old Rouge River was authorized May 28, 1935, by the Emergency
Relief Appropriation Act of 1935. The latest published maps are in
House Document No. 2063, Sixty-fourth Congress, second session;
Rivers and Harbors Committee Document No. 19, Seventy-second
Congress, first session; and Senate committee print, Seventy-third
Congress.
   Local cooperation.-The act approved August. 30, 1935, provided
that no Federal expenditures should be made on the improvements in
the old channel until local interests had provided, without cost to the
United States, all necessary rights-of-way and had furnished guar-
anties, satisfactory to the Secretary of War, protecting the United
States against all damages to adjacent lands and property which may
result from dredging operations. Except for the guaranties protect-
ing the United States against damages to adjacent lands and prop-
erty along the 25-foot channel, this requirement has not been com-
plied with. All prior requirements fully complied with.
   Terminal facilities.-There is an iron-ore dock near the river's
mouth equipped with unloading machinery. The Ford Motor Co.
has an ore and coal dock near the head of the river improvement,
with improved type of unloaders. Three docks fully equipped, for
handling oil and oil products, also one dock equipped for handling
gypsum rock, have been constructed along the river bank. These
docks have good railroad connections. In addition there are five
docks owned by sand and gravel companies which have unloading
machinery and two lumber docks. There are also a number of
smaller docks for launches. All docks along the river are privately
owned and understood to be restricted to use of the owners. These
terminal facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year-Regular funds--Main-
tenance.-The U. S. hopper dredge Burton worked during the period
September 30 to October 3, and from November 1 to November 27,
1936, removing a total of 100,367 cubic yards, bin measure.
    The costs and expenditures during the fiscal year were $21,548.27
for maintenance.
    Condition at end of fiscal year.-The 21-foot project via Short Cut
Canal to upper limit of improvement was completed in 1923 at a
saving of $28,354 under the estimated cost. The work consisted in
dredging and in construction of five dolphins at the mouth of the
Short Cut Canal. Contract work on the 25-foot project, at the
mouth of the river in the old channel, was completed with funds
allotted from the Emergency Relief Administration. Due to the
lack of funds, contract operations were restricted to a distance of
1,150 feet upstream from the mouth of the old channel. All other
work provided for in the act of August 30, 1935, relative to the old
channel is held in abeyance until local interests have complied with
the requirements as to local cooperation.
                      RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                          1321
   As a result of the dredging, project depth has been obtained for a
minimum width of about 100 feet from Dix Avenue Bridge to Detroit
River via Short Cut Canal. The controlling depth in the 25-foot
project is 23 feet, except for a 30-foot width along the north channel
line, for a distance of 1,100 feet from the mouth of the old channel;
from this point to the junction with the Short Cut Canal the con-
trolling depth is 17 feet over a minimum width of 55 feet. The last
survey, made in December 1936, shows depths in the turning basin
of 19 feet except near shore.
   All bridges have been altered in accordance with the requirements
of law. The turning basin at the head of the improvement has been
completed. The head of navigation is determined by a fixed bridge
about 2,600 feet above the upper end of the improvements.
   The costs and expenditures have been as follows:
Regular funds:
   New work-----------------------------------------------    $561, 645. 86
    Maintenance ---------------------------------------------- 367, 209. 38

     Total---------------------------------------------------928, 855.24
Emergency Relief funds-new work-----------------------------29, 515. 50

              Total, all funds------------------------------------------                                                          958, 370. 74
   Proposed operations.-The balance unexpended at the end of the
fiscal year ($1,876.60) less $1,200 to be revoked in July 1937, plus an
allotment of $19,700 made July 20, 1937, a total of $20,376.60 will be
applied to maintenance dredging by United States hopper dredge
during September 1937.
   Rouge River is used by deep draft ore, stone, coal, and oil carriers.
The volume of traffic is constantly increasing. The importance and
volume of traffic using this river require maintenance of full project
dimensions. Shoaling in this channel is progressive and annual
maintenance dredging is required. The sum of $26,000 can be profit-
ably expended for this purpose during the fiscal year 1939.
                                                          Cost and financial summary
Cost of new work to June 30, 1937-----------------------------                                                                   $641, 243. 85
Cost of maintenance to June 30, 1937 ---------------------------                                                                  423, 816. 89
              Total cost of permanent work to June 30, 1937------ -----                                                       1, 065, 060. 74

Net total expenditures-------------------------------------- 11, 065,060. 74
Unexpended balance June 30, 1937-----------------------------      1,876.60
              Total amount appropriated to June 30, 1937------------ 11,066,937. 34

              Fiscal year ending June 30                                    1933              1934          1935          1936              1937


Cost of new work--...                     ---.. -- ----------------------------------...........
                                            ---...                                                                    $29, 515. 50
                                                                                                                   --.......
Cost of maintenance---.....----------------                              $17, 215. 79    $23, 008. 50    $20, 549. 07   13, 246. 77    $21, 548. 27
          Total cost....--          .....-----------------------          17, 215. 79      23, 008. 50    20, 549. 07   42, 762. 27        21, 548. 27
Total expended-.........----------------------                            17, 136. 43      23, 065. 50    20, 549. 07   42, 762. 27        21, 548. 27
Allotted-.............-----...............-----------------------.....    19, 906. 23      40,129. 01     46,200. 00    19, 515. 50   ..

     1 Includes $29,515.50 Emergency Relief funds.
1322         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936----------------------------                                    $23, 424.87
Gross amount expended-----_ ------------------------------                                      21, 548.27

     Balance unexpended June 30, 1937-----------------------                                     1, 876. 60
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------------------------                                     19, 700. 00

      Balance available for fiscal year 1938 2-------------------                               21, 576. 60
Amount (estimated) required to be appropriated for completion
of existing project --------------------------------------                                    228, 000. 00
Amount that can be profitably expended in fiscal year ending June
                           8- - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1939, for maintenance                                                                      26, 000. 00
  2 Includes $1,200 revoked since July 1, 1937.
  8 Exclusive of available funds.


                               13. MONROE HARBOR, MICH.

   Location.-The harbor is located on the lower reach of the Raisin
River and empties into Lake Erie at Monroe, Mich. (See U. S.
Lake Survey Chart No. 3.)
   Existing project.-This provides for a channel 21 feet deep and
300 feet wide in Lake Erie, a distance of about 14,800 feet; thence
21 feet deep and 200 feet wide, with necessary additional width at
bends, through the existing canal and in Raisin River, for a distance
of about 9,200 feet; thence 9 feet deep and 100 feet wide to the lower
wharves at Monroe, a distance of about 3,800 feet. The project also
provides for riprapped protecting dikes on each side of the channel
extending lakeward for a distance of about 1,200 feet; for a turning
basin with an area of about 22 acres and depth of 18 feet; and for
the removal of the two existing piers and the rock and timber revet-
ments in the existing canal.
   The project depths are referred to low-water datum for Lake
Erie, which is 570.5 feet above mean tide at New York. The level
of the river varies with that of Lake Erie, which fluctuates irregu-
larly from year to year, the greatest annual fluctuation being about
21/4 feet and the least about three-fourths of a foot as measured by
monthly mean levels.
   The estimate of cost for new work, revised in 1935, is $1,200,000,
of which local interests are to contribute $300.000. The latest (1930)
approved estimate for annual cost of maintenance is $35,000.
   The existing project was adopted by the following river and har-
bor acts: The acts of February 24, 1835, modified by the act of June
10, 1872, provided for a 9-foot channel, protected by revetments and
piers (Annual Report for 1872, p. 237) ; and the act of July 3, 1930,
provided for the 21-foot channel dikes, and turning basin (Rivers
and Harbors Committee Doc. No. 22, 71st Cong., 2d sess.). The con-
dition of local cooperation imposed by the War Department Appro-
priation Act of July 14, 1932 (Rivers and Harbors Committee Doc.
No. 12, 72d Cong., 1st sess.), was modified by the Rivers and Harbors
Act of August 26, 1937 (Rivers and Harbors Committee Doc. No. 45,
75th Cong., 1st sess.). The latest published map showing all the fea-
tures of the project is in the last-mentioned document.
  Local cooperation.-Act of July 3, 1930, requires local interests
to contribute one-half of the cost of the work, but not to exceed
$500,000, and to furnish, without cost to the United States, perpetual
easement in all lands within 200 feet of the center line of the channel
and all land necessary for the turning basin.
         RIVERS AND HARBORS-DETROIT, MICH., DISTRICT              1323
   The War Department Appropriation Act approved July 14, 1932,
modified the above conditions in accordance with the provisions con-
tained in Rivers and Harbors Committee Document No. 12, Seventy-
second Congress, 1st session, which provides that the execution of
the project may be begun when an agency empowered by law to
levy and collect taxes in amount sufficient to meet the required pay-
ments has entered into a formal agreement with the Secretary of War
for the payment of one-half of the principal of the cost of the im-
provement, not to exceed $500,000, in annual installments of $50,000,
and the lands and easements have been furnished as prescribed under
the conditions of adoption of the project. Five payments have been
made to June 30, 1937.
   The act of August 26, 1937, further modified the above conditions,
in accordance with House Document No. 45, Seventy-fifth Congress,
first session, which provides that the contribution by local interests
toward the initial cost of the improvement shall total $300,000, pay-
able in annual installments of $50,000; subject to the condition that
local interests shall, on or before January 17, 1939, furnish assurances
satisfactory to the Secretary of War that they will construct and
maintain, without cost to the United States, such wharf and terminal
facilities as are necessary for the full utilization of the Federal im-
provements, and that these facilities will be accessible and open to the
public on equal terms.
   Terminal facilities.-At the city of Monroe are some small privately
owned docks. These docks are open to all vessels upon equal terms.
The Newton Steel Co. has constructed a private dock. The terminal
facilities are adequate for the existing commerce.
   Operations and results during fiscal year-Regular funds--Main-
tenance.-The IU. S. hopper dredge Taylor removed material in
amount of 22,323 cubic yards, bin measure, from the river channel
and turning basin during the period August 19 to 26, 1936.
   The costs during the fiscal year were $4,895.87, all for maintenance.
The total expenditures were $4,921.85. The Port Commission of
Monroe, Mich., contributed $50,000 during the year, which made the
cost for new work minus $50,000, and the expenditure minus $45,-
078.15 from United States funds.
   Condition at end of fiscal year.-The existing project is complete
except for the riprapping of the protecting dikes on each side of the
channel and for a deficiency of 0.3 foot in the 21-foot project and
turning basin due to change in datum plane for Lake Erie. A sur-
vey made during June 1937 shows controlling depths as follows:
19 feet from Lake Erie to about 2,000 feet lakeward from the mouth
of the river, thence 16.8 feet to a point about 500 feet below the
lower end of the turning basin; thence 9.2 feet to the upper end of
the 21-foot project, and 11 feet in the turning basin except near
shore.
   The costs have amounted to $837,339.64 United States funds and
$250,000 contributed by the Port Commission of Monroe, a total of
$1,087,339.64 for new work, and $146,262.72 for maintenance, a total
cost of $1,233,602.36.
   The expenditures were $983,698.45 United States funds and
$250,000 contributed by the Port Commission of Monroe, a total of
$1,233,698.45.
1324        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Proposed operations.-The balance unexpended at the end of the
fiscal year ($8.04), plus an allotment of $25,000 made July 20, 1937,
a total of $25,008.04, will be applied as follows:
Regular funds:
   Accounts payable June 30, 1937------------------------------      $8. 04
    Maintenance dredging by United States hopper dredge during
      October 1937 -------------------                          21, 000. 00
   Engineering and maintenance surveys during May and June
      1938 ---------     ------ ------------------------------- 4, 000. 00
         Total-------               -----------------------------------                                                25, 008. 04
   Funds in the amount of $20,000 can be profitably expended for
maintenance dredging by United States hopper dredge during the
fiscal year ending June 30, 1939.
                                        Cost and financial summary
                                            UNITED STATES FUNDS

Cost of new work to June 30, 1937------------------------   $1,087, 339. 64
Cost of maintenance to June 30, 1937------------------------- 146, 262. 72
      Total cost of permanent work to June 30, 1937-----------                                                        983, 602.36
Undistributed costs June 30, 1937------ ------------------------                                                           104. 13
     Net total cost to June 30, 1937-------------------------                                                         983, 706. 49
Minus accounts payable June 30, 1937----------__-------                                                                      8. 04

     Net total expenditures  ------------------------------  983, 698. 45
Unexpended balance June 30, 1937------------------------------      8. 04

        Total amount appropriated to June 30, 1937---------------                                                     983, 706. 49

   Fiscal year ending June 30               1933               1934                   1935               1936                 1937


Cost of new work._..-.-.-... .      _    $23,922.98       $61, 696. 79          $669, 096. 48      -$32, 016. 02        -$50, 000. 00
Cost of maintenance..-------------                 4.87        6,807. 09              --.. --------.            ---.           4,895. 87
      Total cost               ...------ 23,927.85
                   --..............--                         68,503. 88            669, 096. 48    -32, 016. 02             -45, 104. 13

                                26, 154. 44
Total expended--..................                            64, 697. 69           619, 282. 66      31, 196. 11            -45, 078. 15

Allotted...........--------------         536, 185. 15    288, 447. 44         -----------          -90, 706. 97         -100,    000. 00


Balance unexpended July 1, 1936-----------------------------                                                           $54, 929. 89
Deductions on account of revocation of allotment---------------                                                        100, 000. 00
      Net amount to be accounted for-----------------------                                                         -45,       070. 11
Gross amount expended------------------------$54, 921.85
Less reimbursements collected------------------- 100,000. 00
                                                                                                                      -45,     078. 15

      Balance unexpended June 30, 1937     -----------------     --         8. 04
Outstanding liabilities June 30, 1937--  --------------------------         8.04
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937_       _------- --        - __      -__   -_ 25, 000. 00
Balance available for fiscal year 1938--------------------------25, 000. 00

Amount (estimated) required to be appropriated for completion
                                                       -- - -
                    1-
of existing project ____________________        ___                                                                    90, 000. 00
Amount that can be profitably expended in fiscal year ending
                                                     1-   -     -     -    -    -     -   -          -          - -
                                                                                                                -
   June 30, 1939, for maintenance                                                                    __                 20, 000. 00
    xExclusive of available funds.
                   RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                                   1325
                                                                 CONTRIBUTED FUNDS

Cost of new work to June 30, 1937-..-.. ---------        ----                                                                       $250, 000.00
Cost of maintenance to June 30, 1937____                                                                                    ---------------
      Total cost of permanent work to June 30, 1937 -----------                                                                      250, 000.00
Net total expenditures--------------- ---------------------                                                                          250, 000. 00
Total amount contributed to June 30, 1937---------------------                                                                       250, 000. 00

            Fiscal year ending June 30                                        1933             1934            1935          1936               1937


Cost of new work_..---------------------------_                                     --      $74,533.42 $75, 466. 58    $50, 000     $50, 000
Cost of maintenance---------------                                      ----------------            -- -----------------------------------
Total expded------------................---------........            ------------            74, 533.42     75, 466. 58       50,000              50,000
Oostributed..-                .---.-.-.-.---------------                     $50,000         50,000,00      50,000.00         50, 000             50, 000


Amount contributed___----------------------------                                                                                    $50, 000. 00
     amount expended
,Gross               -----------------------------------                                                                              50, 000.00

         CONSOLIDATED                COST AND FINANCIAL SUMMARY FOR MONROE I-ARBOR,                                                      MICH.

Cost of new work to June 30, 1937------                                      $1, 087, 339. 64
Cost of maintenance to June 30, 1937-------------------                           146, 262. 72
      Total cost of permanent work to June 30, 1937                               233, 602. 36
                                                                              1-----------,
Undistributed costs June 30, 1937__--___                           -_________- -       104.13___-
      Net total cost to June 30, 1937                                           , 233, 706. 49
                                                                              1--------------------
Minus accounts payable June 30, 1937- --------------------                                8. 04
      Net total expenditures               ----------------------------       1, 233, 698.45
Unexpended balance June 30, 1937--------------------                  ----------          8. 04
      Total amount appropriated and contributed to June 30,
         1937   ------------------------------------------                    1, 233, 706. 49

            Fiscal year ending June 30                                        1933             1934           1935           1936               1937


Cost of new work.....---------------------                              $23,922. 98 $136, 230. 21 $744, 563. 06           $17, 983. 98    _.

Cost of maintenance.....-----------------------                                     4. 87     6,807. 09                      -
                                                                                                           _---------_-_ __ _-_-               $4, 895. 87
         Total cost-------........    -....---.-                 -       23, 927. 85        143, 037. 30   744, 563. 06    17, 983. 98          4, 895. 87

Total expended                                     __ ____
                                             -...............-           26, 154. 44        139, 231. 11   694, 749. 24    81,196.11            4, 921. 85
Allotted and contributed---.....---------                               586, 185. 15        338, 447.44     50, 000.00 -40, 706. 97        -50, 000. 00


Balance unexpended July 1, 1936 ------------------                                                                                  $54, 929. 89
Amount contributed---------------------------------------                                                                            50, 000. 00
      Amount to be accounted for                                                                                                    1---___------------__
                                                                                                                                    104, 929.89
Deductions on account of revocation of allotment --------------                                                                     100, 000. 00
      Net amount to be accounted for-------------------------                                                                         4, 929. 89
Gross amount expended--------------------- -- $104,921.85
Less reimbursements collected------ ---------        100, 000. 00
                                                                                                                                          4, 921, 85
      Balance unexpended June 30, 1937-----------------                                                                                        8. 04
Outstanding liabilities June 30, 1937____ ______________
                                                   --------                                                                                    8. 04
:Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937-----------    -----------------------                                                                          25, 000. 00
Balance available for fiscal year 1938_________ ___   ___ __                                                                            25, 000.00
Amount (estimated) required to be appropriated for completion
of existing project - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                           90, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance1 -       - - -
                                        ___         __ - - - -                                                                           20,000.00
1
   Exclusive of available funds.
1326    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                     14. TOLEDO HARBOR, OHIO

   Location.-This harbor comprises the lower 7 miles of Maumee
River and the channel about 9 miles long through Maumee Bay to
Lake Erie. The Maumee River has its source in northern Indiana
and empties into Lake Erie. The harbor is located at the westerly
end of Lake Erie, 99 miles westerly from Cleveland, Ohio. (See
U. S. Lake Survey Chart No." 3.)
   Previous projects.--Adopted by river and harbor acts of June 23,
1866, June 14, 1880, July 5, 1884, August 5, 1886, July 13, 1892, and
August 18, 1894. The total amount expended and the total cost
under these projects prior to the adoption of the existing project in
1899 was $1,624,695.45 for new work and maintenance (not separa-
ble). For further details see page 1959 of Annual Report for 1915.
   Existing project.-This provides for a channel 25 feet deep .and 500
feet wide from deep water in Lake Erie to the mouth of the Maumee
River, with a width of 300 feet on each side of center dike in the bay
channel; for a channel 25 feet deep in Maumee River to the Balti-
more & Ohio Railroad dock, 400 feet wide from the mouth of the
river to the Fassett Street Bridge, and 200 feet wide above that
point; for a turning basin at the upper end, 18 feet deep and 8.25
acres in area; for an auxiliary channel on the north side, 200 feet
wide and 19 feet deep, extending for a distance of 1 mile above
Fassett Street Bridge; and for a stone-revetted earth dike, 1,000 feet
long, to form a foundation for range lights in Maumee Bay.
   The project depths are referred to low-water datum for Lake Erie,
which is 570.5 feet above mean tide at New York. Ordinary fluctua-
tions of water level are from 4 feet above to 2 feet below low-water
datum, and extreme fluctuations, produced by wind and other causes,
are from 9 feet above to 6.5 feet below that plane.
   The estimate of cost for new work, revised in 1936, was $5,110,400,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $125,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1899, provided for the auxiliary chan-
nel above Fassett Street Bridge and for the dike (H. Doc. No. 198,
55th Cong., 2d sess., and Annual Report for 1898, p. 2693); act of
June 25; 1910, provided for a channel 21 feet deep (H. Doc. No. 865,
60th Cong., 1st sess.); and the act of August 30, 1935, provided for
the present project dimensions of the main channel and turning
basin. (Rivers and Harbors Committee Doc. No. 21, 72d Cong., 1st
sess., which document contains the latest published map.)
   Local cooperation.-The work authorized by the act of August 30,
1935, is subject to the condition that disposal areas will be provided
free of cost during initial construction and for future maintenance
as and when needed.
   Terminal facilities.-The city of Toledo has provided a lagoon
near the mouth of the river suitable for the winter mooring of
vessels. Three large railroad terminals for the handling of ore
and four for coal are open toy shippers of these commodities; one
fuel dock and three docks with elevator facilities for handling grain.
Three pipe-line docks for shipment of oil, one pipe-line dock for
receipt of gasoline, and three fish docks are private. Two package-
freight terminals are leased by companies operating regular lines of
          RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                         1327
vessels. Considerable wharf frontage is owned by railroads, which
is available for the transshipment of miscellaneous cargoes, such as
lumber, etc., to and from cars. Of 10 sand and gravel docks, 2 are
for public use. Four docks at street ends are owned by the city of
Toledo, at which freight may be loaded or unloaded free of charge,
no storage being allowed. Terminal facilities are regarded as ade-
quate for existing commerce.
   Operations and results during fiscal year.-A field office was main-
tained for supervision of the harbor and miscellaneous surveys and
inspections. The costs amounted to $6,512.14, all for maintenance,
and the expenditures were $8,240.57.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936. Shoaling has resulted in a contolling depth of 24.0
feet in the 25-foot project, except abreast of the turning basin, where
the controlling depth in the channel is about 23.0 feet. Depths of
about 15.0 feet are available in the turning basin.
   The costs have been as follows:
Regular funds:
    New work and maintenance prior to 1903 (not separable)__ $1, 410, 262. 25
    Maintenance since 1903----------------------- -----------   1, 932, 829. 68
       Total--------------------------------- --------------- 3, 343, 091. 93
Public Works funds: New work------------------------------3,       690, 000. 00
      Total, all funds----------------------------------- ----- 7, 033, 091. 93
   The expenditures were $3,342,855.26 regular funds and $3,690,000
Public Works funds, a total of $7,032,855.26.
   Proposed operations.-The balance unexpended at the end of the
fiscal year ($8,133.67), less $5,000 to be revoked in July 1937, plus an
allotment of $51,300 made July 20, 1937, a total of $54,433.67, will
be applied as follows:
Regular funds:
    Accounts payable June 30, 1937----------------------------- $1, 122.28
    Maintenance dredging by United States hopper dredge during
      September, October, and November, 1937 (21/2 months)   ----         50, 000. 00
    Custody of harbor, engineering, and contingencies--------------3,         311. 39
       Total---------------------------------------------------           54, 433. 67
  The Maumee Bay Channel is subject to continual shoaling.                       To
provide for the safe navigation of deep-draft vessels carrying the
large volume of commerce into and out of this port, project dimen-
sions should be maintained. Funds in amount of $75,000 can be
profitably expended during the fiscal year ending June 30, 1939, in
maintenance dredging by United States hopper dredges in the bay
channel, and harbor supervision.
                         Cost and financial summary

Cost of new work to June 30, 1937--_  ___-_____--____-              1$6, 724, 957. 70
Cost of maintenance to June 30, 1937--------------                    1, 932, 829. 68
      Total cost of permanent work to June 30, 1937-----              8, 657, 787. 38
Undistributed costs June 30, 1937----------------------------                 885. 61
      Net total cost to June 30, 1937                                 8, 658, 672. 99
Minus accounts payable June 30, 1937------------------------               1, 122. 28
       Net total expenditures----------_, _-        -                 8, 657, 550. 71
Unexpended balance June 30, 1937 --------------                            8, 133. 67
       Total amount appropriated to June 30, 1937----------           8, 665, 684. 38
1 Includes $3,690,000 Public Works funds.
       20196--37-pt. 1_-84
1328                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


     Fiscal year ending June 30                            1933             1934              1935              1936          1937

Cost of new work--------.......  ------             -__ $302, 867. 98 $1, 345, 810.02 $2, 184. 177. 34 .----
Cost of maintenance.............        $31, 737. 15       1, 840. 36       3, 686. 54      2, 948. 20       $6, 512.14
         Total cost.----------------                      31, 737. 15     304, 708. 34    1,349, 496. 56   2, 187, 125. 54     6, 12. 14
Total expended-----------------..................         32, 678. 41     220, 295. 42      948, 651.07    2, 661, 552. 35     8, 240.57
Allotted----------------------.........................   63, 986. 31   3, 673, 332. 10     -7, 500. 00      173, 000. 00    -24 400.00

Balance unexpended July 1, 1936-------------------------- --                                    $40, 774.24
Deductions on account of revocation of allotment ------ ,-. ____                                 24, 400. 00
      Net amount to be accounted for,-------.                            ------------            16, 374.24
Gross amount expendd --             ----------------------- $8, 6.                      384
Less reimbursements 'bHected------------------------                                  85.77
                                                                                                   8, 240. 57
      Balance unexpended June 30, 1937-------------- -------                                       8, 133. 67
Outstanding liabilities June 30, 1937 ---------------                                    - . -1,      122. 28
      Balance available June 30, 1937                                  ..-------------------       7,011.39
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-------------------------------------51,                                        300. 00
      Balance available for fiscal year 1938-----------------                                    58, 311. 39
Amount that can be profitably expended in fiscal year ending June
                                     - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 75, 000. 00
  30, 1939,
     2
                   ainenace - -......
            fr maintenance
            for
         30,193,                                                                                 '75,000. 00
      Includes $5,000 to be revoked in July 1937.
     8 Exclusive of available funds.

                                                 15. PUT IN BAY HARBOR, OHIO

    Location.-On the north side of South Bass Island, in Lake Erie,
about 38 miles east of Toledo, Ohio.
    Existing project.-This provides for a channel of varying width,
not exceeding 225 feet, and 14 feet deep from that depth in the lake
to a point 150 feet west of the Fox wharf; thence 100 feet wide and
8 feet deep along the harbor frontage to the vicinity of Miller's
wharf, a farther distance of 1,600 feet, provided that no dredging
shall be done by the United States closer than 25 feet to existing
structures.
    The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are from 1.3 feet above to 2 feet
below low-water datum, and extreme fluctuations produced by wind
and other causes are from 6.0 feet above to 2.5 feet below that plane.
    The estimate of cost for new work, made in 19317, is $50,000, with
 $500 annually for maintenance.
    The existing project was authorized by the River and Harbor Act
  of August 26, 1937 (H. Doc. 132, 75th Cong., 1st sess.). The project
document contains the latest published map.
     Terminal facilities.-There are 25 docks in existence at this local-
ity; 3 of these docks are commercial wharves, the others being used
  for tying small pleasure craft, commercial livery boats, and commer-
  cial fishing boats. The Fox dock and the Dollar dock are used by
  steamboats carrying passengers and small package freight, while the
  Dodge dock is used for receipt of coal brought in by barges. None
  of the wharves has any mechanical equipment for handling freight.
  All of the docks, except one, are privately owned and are open to
  all vessels upon equal terms. The terminal facilities are adequate
  for the existing commerce.
          RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                       1329
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year---No:work has been done and the
condition remains the same as that given in the project document.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year ending June 30, 1938.
  Funds in the amount of $50,000 can be profitably expended during
the fiscal year 1939, in completion of the project, by contract.
                           Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937
       Net total expenditures_....................................
Total amount appropriated to June 30, 1937--------------------           -------
Amount (estimated) required to be appropriated for completion of
existing project--------               ------------------------------- $50,000.00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work------------------.----------------50,              000. 00

                    16. PORT CLINTON HARBOR, OHIO

  Location.-Port Clinton Harbor comprises the lower half mile of
the Portage River, which empties into Lake Erie at a point 72 miles
westerly from Cleveland, Ohio. It is from 200 to 300 feet wide
(See U. S. Lake Survey Chart No. 3.)
  Existing project.-This provides for parallel stone and pile jetties
at the mouth of the river, the east jetty 2,200 feet long and the west
jetty 1,980 feet long, extending to the 10-foot contour in the lake,
and for dredging a channel to a depth of 10 feet and 100 feet wide,
widening at the bridge to 200 feet for a length of 800 feet. The
length of the channel to be 5,000 feet, extending from 2,100 feet out-
side the jetties up to the highway bridge.
   The project depth is referred to low-water datum for Lake Erie,
which is 570.5 feet above mean tide at New York. Ordinary fluctu-
ations of water level are from 3 feet above to 2 feet below low-water
datum, and extreme fluctuations produced by wind and other causes
are from 6.5 feet above to 3 feet below that plane.
   The estimate of cost for new work, revised in 1883, was $90,000.
The latest (1918) approved estimate for annual cost of maintenance
is $2,000.
   The existing project was adopted by the River and Harbor Act of
June 10, 1872 (annual report for 1875, p. 295). For latest published
map see House Document No. 815, Sixty-first Congress, second
session.
   Terminal facilities.-There are five private docks and one public
fish dock, one private sand dock, and one public fueling dock, which
is also used as a private lumber and cargo coal terminal. One dock
at the foot of Madison Avenue is owned by the village of Port Clin-
ton and is open to the public. One shipyard does some business
in the building of small boats and launches. Terminal facilities are
regarded as adequate for the needs of ekisting commerce.
   Operations and results during fiscal year.-None. There were no
costs nor expenditures during the fiscal year.
   Condition at end of fiscal year.-The existing project was completed
in 1893 at a saving of $18,050 under the estimated cost. The work
done consisted in the construction of two jetties, completed in 1883,
1330           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and in dredging a channel from the lake to the highway bridge,
completed i~ 1893. The jetties are in fair condition. The control-
ling depth of the channel in the lake is 7.7 feet, as shown by survey
of June 1937. The head of navigation for light-draft boats is about
12 miles above the mouth of the river.
   The costs have amounted to $71,949.86 for new work and mainte-
nance prior to 1894 and $35,553.60 for maintenance since 1894, a total
of $107,503.46. The total expenditures were $107,503.46.
   Proposed operations.-No funds are available. No dredging has
been done at this locality during the past 21 years. Shoaling in the
channel and bay has reduced project depth by more than 2 feet.
There is considerable commerce consisting of light-draft fishing and
pleasure craft using this harbor. The amount that can be profit-
ably expended on maintenance dredging during the fiscal year 1939
for restoration of project dimensions is $15,000.
                                              Cost and financial summary
Cost of new work to June 30, 1937------------------------------                                                   $71,949. 86
Cost of maintenance to June 30, 1937----------------------------                                                   35, 553. 60
      Total cost of permanent work to June 30, 1937------------                                                   107, 503.46
Net total expenditures_____________------___----------------                                                      107, 503. 46
Total amount appropriated to June 30, 1937--------------------                                                    107, 503. 46
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance                                                                                            1------------------------------
                                                                                                                      1, 000. 00

     17. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year was $52,664.02, and the expendi-
tures were $55,144.29.
   The balance unexpended at the end of the fiscal year ($8,218.28),
plus an allotment of $50,000 made July 20, 1937, a total of $58,218.28,
will be applied to accounts payable, and to payment of expenses
incurred under this headifig during the fiscal year ending June 30,
1938.
  The sum of $60,000 can be profitably expended for the same pur-
pose during the fiscal year ending June 30, 1939.
                                              Cost and financial summary
Cost of new work to June 30, 1937------------
Cost of maintenance to June 30, 1937----___---$------                                              __      __ $304, 330. 77
      Total cost of permanent work to June 30, 1937_------------304, 330. 77
Undistributed costs June 30, 1937--------------------------------10, 614. 71

      Net total cost to June 30, 1937 ________________________                                                    314, 945. 48
Minus accounts payable June 30, 1937__---------                                                 _______             2, 198. 81
      Net total expenditures------------------------------------                                                      312, 746. 67
Unexpended balance June 30, 1937_--------------                                                                         8, 218.28
          Total amount appropriated to June 30, 1937_--__--                                        ____-320, 964. 95

          Fiscal year ending June 30                      1933             1934             1935          1936                1937


Cost of new work-.................
                               ...------
                                  ------                        9--- -
                                                            ------            -        - -$ - ------------6            ----......--------
Cost of maintenance_.------......$29, 937. 97                            $8,940. 90 $17, 278. 96 $59, 266. 26             $52,664. 02
Total expended------------------.................       27, 490. 87      17, 976. 87      20,840. 77    54, 439. 98         55, 144. 29
Allotted-....             ....-....--------         .   30,957. 17       29, 757. 78      42, 000. 00   64, 000. 00           000. 00
                                                                                                                            15,
              RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                            1331
Balance unexpended July 1, 1936___________ ___________-- ---                                                  $48, 362. 57
Amount allotted from War Department Appropriation Act approved
  April 26, 1934 ------------                                                                                   15, 000. 00

      Amount to be accounted for    -------                                                                     63, 362. 57
Gross amount expended-----------------------------$58,                                          010.69
Less reimbursements collected-__    __     ____----                                          2, 866. 40
                                                                                                                55, 144. 29
      Balance unexpended June 30, 1937------------------------                                                   8, 218. 28
Outstanding liabilities June 30, 1937-------    __-------_2, 198. 81
Amount covered by uncompleted contracts--------------         74. 60
                                                                                                                 2, 273. 41

     Balance available June 30, 1937_------------------                                                          5, 944. 87
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937    ------------------------------------                                                 50, 000. 00

      Balance available for fiscal year 1938------------- ----                                                  55, 944. 87
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1___ - - -               -
                                                                                                                6___________________
                                                                                                                60, 000. 00
   1 Exclusive of available funds.

18. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
             [Commercial statistics of these projects are given in part 2 of report]


                                                                   For last    Cost and expenditures to         Estimated
                                                                 full report
                                                                Name
                                                                see    of project    June 30, 1937                amount
                                                                     annual                                     required to
                                                                report for-    New work Maintenance              complete


Mackinac Harbor, Mich.'   ----------------------_                     1931    $77, 982. 12     $23, 419. 02     Completed.

  I Improvements are adequate for existing commerce.

           19. PLANT ALLOTMENT FOR DETROIT, MICH., DISTRICT

                                  Cost and financial summary
Undistributed costs June 30, 1937-----------------------------                                                $329, 902. 68
Plus accounts receivable June 30, 1937_______---_____                                                           20, 252. 05
     Gross total costs to June 30, 1937------------------------350,     154. 73
Minus accounts payable June 30, 1937--------- ---------             15, 296. 52
     Net total expenditures_-- -----                            334, 858. 21
Unexpended balance June 30, 1937-----------------------------59,     724. 78
           Total amount appropriated to June 30, 1937                                                          394, 582. 99

   Fiscal year ending June 30             1933                       1934       1935             1936               1937


Total expended......---------- --------------- ---------- $234, 322.44                        $113, 206. 51      -$12, 670. 74
Allotted                         _......................
                                             ....      ..-..............      255, 129. 83     109, 453. 16         30, 000. 00


Balance unexpended July 1, 1936____________ ________________      $17, 054. 04
Amount allotted from War Department Appropriation Act ap-
  proved Apr. 26, 1934----------------------------------------30,      000. 00
      Amount to be accounted for------------_                                                                   47,054. 04
Gross amount expended--- ----------                                                    $314, 580. 15
1332       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Less:
    Reimbursements collected---------                      $326, 540. 00
    Receipts from sales----------------                          710. 89
                                                                                $327, 250. 89
                                                                                                     $12, 670. 74

      Balance unexpended June 30, 1937_                                                               59, 724. 7
Outstanding liabilities June 30, 1937 _ -______- ____-                                $15, 296. 52
Amount covered by uncompleted contracts __-__- --                                       3, 211. 17
                                                                                                      18,507. 69
     Balance available June 30, 1937---------                                                         41,217. 09
Accounts receivable June 30, 1937 _ -__- ----                          __             -_--__          20, 252. 05

       Unobligated balance available June 30, 1937__ ___________
                                                        ..                                            61,499. 14

Status of reports called for by river and harbor acts and committee resolutions
                                                  Transmitted             Document no.               Recommenda-
       Locality            Authorization act      to Congress             Document no.               Recommenda-
                                                                                                         tion

Au Sable River, Mich..    Senate committee reso- ....             _...._.._....._..
                            lution, Apr. 26, 1937.
Cheboygan Harbor and      River and Harbor Jan. 14,1937            House, 134, 75th Cong.,           Favorable.
Cheboygan River,           Act, Aug. 30, 1935.                      1st sess.
Mich.
Detroit River, Mich-...   Rivers and Harbors Apr. 3, 1937 House, 205, 75th Cong., Do.
                            Committee resolu-                1st sess.
                            tion, Jan. 28, 1935.
Detroit River, Mich.,     River and Harbor .....                                  Do.
                                                 do ......... do.............---------------.
and channel to Sugar       Act, Aug. 30, 1935.
Island.
Mackinac Harbor, Mich. Senate committee reso-     _.
                          lution, Nov. 3, 1936.
Monroe Harbor, Mich_    Rivers and Harbors        July 14,1937      Rivers and Harbors                    Do.
                          Committee resolu-                           Committee, 45, 75th
                          tion, Jan. 27, 1937.                        Cong., 1st sess.
Ottawa River, Ohio-.... River and Harbor          ..........
                          Act, Aug. 26, 1937.
Point Lookout Harbor, Rivers and Harbors-              -
Mich.                    Committee resolu-
                          tion, Mar. 20, 1936.
Port Austin Harbor, River and Harbor              ..
Mich.                    Act, Aug. 30, 1935.
Port Sanilac Harbor, ----- do
Mich.
Put-in-Bay, Ohio- ..... River and Harbor
                           Act, Aug. 26, 1937.
Put-in-Bay, Ohio, estab- River and Harbor Jan. 7, 1937 House, 132, 75th Cong.,     Do.
lishment of harbor.       Act, Aug. 30, 1935.             1st sess.
Saginaw 3ay, Mich..... River and Harbor
                           Act, Aug. 26, 1937.
                         Rivers and Harbors
    Do--------------..................
                           Committee resolu-
                           tion, May 18, 1937.
    Do                   Rivers and Harbors Mar. 23,1937 Rivers and Harbors
           ---..................                                                   Do.
                           Committee resolu-               Committee, 21, 75th
                           tion, May 28, 1936.             Cong., 1st sess.
Toledo Harbor, Ohio.... Rivers and Harbors Nov. 6,1936 ........................ Unfavorable.
                           Committee resolu-
                           tion, Jan. 31, 1935.


IMPROVEMENT OF RIVERS AND HARBORS                                                                    IN     THE
          BUFFALO, N. Y., DISTRICT
  This district comprises all of the south shore of Lake Erie from
and including Sandusky Harbor, Ohio, to Buffalo Harbor, N. Y.,
the east side of Niagara River, all of the south shore of Lake On-
tario eastward from Niagara River, and the St. Lawrence River as
far east as the international boundary line.
   District engineer: Col. J. A. O'Connor, Corps of Engineers.
   Division engineer: Col. L. V. Frazier, Corps of Engineers.
          RIVERS AND HARBORS--BUFFALO, N. Y., DISTRICT                         1333
                                IMPROVEMENTS

                                  Page                                          Page
1. Sandusky Harbor, Ohio ....     1333   16. Rochester (Charlotte) Har-
2. Huron Harbor, Ohio ------ 1335              bor, N. Y ____________         1384
3. Vermilion Harbor, Ohio ....    1338   17. Great Sodus Bay Harbor,
4. Lorain Harbor, Ohio-.--..      1340         N. Y______----------       _   1387
5. Rocky River, Ohio_ ----        1343   18. Little Sodus Bay Harbor,
6. Cleveland Harbor, Ohio...      1345         N. Y___________________        1389
7. Fairport Harbor, Ohio-     _   1349   19. Oswego Harbor, N. Y------        1391
8. Ashtabula Harbor, Ohio ...     1354   20Cap.
9. Conneaut Harbor, Ohio ...      1358   20. Cape Vincent Harbor, N. Y         1395
10. Erie Harbor, Pa-----------     1361   21. Morristown Harbor, N. Y_          1396
11. Dunkirk Harbor, N. Y ----      1365   22. Ogdensburg Harbor, N. Y__         1397
12. Buffalo Harbor, N. Y-.. _      1367   23. Examinations, surveys, and
13. Black Rock Channel and                      contingencies (general)_--      1399
      Tonawanda Harbor, N. Y       1373   24. Other projects for which no
14. Niagara River, N. Y__--      _ 1380         estimates are submitted        1400
15. Olcott Harbor, N. Y--------. 1383     25. Plant allotment_-----------      1400

                      1. SANDUSKY HARBOR, OHIO

   Location.-This harbor is located in the southeasterly portion of
Sandusky Bay, 55 miles westerly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 365.)
   Previous projects.-Adopted by River and Harbor Acts of June
11, 1844, June 23, 1866, March 3, 1873, July 5, 1884, August 11, 1888,
and August 18, 1894. The total cost and expenditures were $477,-
149.09 for new work and maintenance (not separable). (For fur-
ther details see p. 1960 of Annual Report for 1915.)
   Existing project.-This provides for a channel 400 feet wide and
21 feet deep from deep water in Lake Erie through Sandusky Bay,
a distance of about 31/2 miles, to the city water-front docks, thence
along the water front, a channel about 7,800 feet in length, 300 feet
wide, 22 feet deep, ending in a turning basin 800 feet wide, 22 feet
deep; for a dike constructed with the excavated rock on the north
side of the channel and basin; for protection works consisting of a
stone jetty on the easterly side. of the channel extending northeast-
erly from Cedar Point, a distance of 6,000 feet, with suitable pier-
head; a short stone spur at Cedar Point; and for the revetment of
the slope adjacent to the channel in the vicinity of the front range
light with a brush-and-stone mattress.
   The project depth is referred to low-water datum for Lake Erie,
which is 570.5 feet above mean tide at New York. Ordinary fluctua-
tions of water level are from 3 feet above to 0.5 foot below low-water
datum, and extreme fluctuations, produced by wind and other causes,
are from 6 feet above to 2.5 feet below that plane.
   The estimate of cost for new work, revised in 1935, was $2,690,000
 (including $275,000 contributed by local interests), exclusive of
amounts expended on previous projects. The latest (1935) approved
estimate of annual cost of maintenance is $28,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1899, provided for the channel-protec-
tion works (H. Doc. No. 362, 55th Cong., 2d sess., and Annual Report
for 1898, p. 2708) ; act of March 2, 1919, provided for the latest dimen-
sions of the dredged channel, other than the enlargement of the
turning basin, and of the east jetty and pierhead (H. Doc. No. 982,
64th Cong., 1st sess.); act of January 21, 1927, provided for deepen-
ing the dock channel to 22 feet (H. Doc. No. 584, 69th Cong., 2d
1334     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

sess.); the Public Works Administration on November 15, 1933,
and the act of August 30, 1935, provided for enlarging the turning
basin and constructing the rock dike (Rivers and Harbors Commit-
tee Doc. No. 2, 73d Cong., 1st sess.). The latest published maps are
in the last three mentioned documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The city of Sandusky has constructed two
municipal wharves, which are leased to private interests to operate
a coal terminal thereon, which terminal is open to shippers of coal,
and handles about 98 percent of all the tonnage shipped by water
from this harbor, or 97 percent of the total receipts and shipments.
Two other terminals with warehouses are used by regular vessel lines
carrying passengers and miscellaneous freight open to the public.
One fuel dock, privately owned, does a public business. One dock
for stone, four for sand, five for fish, one for a barge line, and two
marine railways for small craft are private. Three private docks, of
which two are on Cedar Point, handle passengers and merchandise
in connection with the summer resort in that locality. The city of
Sandusky owns docks at two street ends which can accommodate
small boats, and one dock near the foot of Jackson Street, all open
to the public. The facilities are regarded as adequate for the needs
of existing commerce. (See Lake Series No. 8, 1932, Corps of
Engineers.)
   Operations and results during fiscal year.-Government plant and
hired labor removed 77,454 cubic yards of material for restoration
of project depth in the channels and basin at a total cost of $22,000.16
for maintenance. The total expenditure was $19,610.32.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935. The protecting works are generally in good condi-
tion. The jetty requires repairs where settlement has taken place.
The controlling depth in the channels and basin is 21 feet at low-
water datum.
   The total cost of the existing project was $3,169,763.41, of which
$2,597,258.21 was for new work and $572,505.20 for maintenance.
The total expenditure was $3,164,657.43. In addition $325,000 was
expended from contributed funds for new work.
   Proposed operations.-The balance unexpended at the end of the
year, together with an allotment of $27,500, made in July 1937, will
be applied as follows:
Accounts payable June 30, 1937_----------------------------------$5,        105. 98
Maintenance :
    Dredging by U. S. hopper dredges Burton and Taylor
      and derrick boat Niagara, July and November 1937_ $25, 500.00
    Sweeping by hired labor, April 1938---. _______-        2, 000. 00
                                                                         27, 500.00

          Total ------   _-------------- ----------------------------    32, 605. 98
   Redredging and sweeping are required annually and repairs to east
jetty are necessary. For these items of maintenance, the additional
sum of $37,500 can be profitably expended during the fiscal year 1939
as follows:
Dredging by U. S. hopper dredge Burton, fall 1938_                         $20, 000
Repairs to east jetty by U. S. derrick boat Tonawanda, spring 1939____      15,000
Sweeping by hired labor, fall 1938 and spring 1939_---------------           2, 500
       Total-----___-___---------------                        -_           37, 500
               RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                                  1335
                                          Cost and financial summary
Cost of new work to June 30, 1937__11111111111111       1      1_$3, 074, 407. 30
Cost of maintenance to June 30, 1937--------------------------       572, 505.20
      Total cost of permanent work to June 30, 1937---------- 3, 646, 912. 50
Minus accounts payable June 30, 1937-------------------------      5,105. 98

     Net total expenditures-------------------------------     3, 641, 806. 52
Unexpended balance June 30, 1937 -----------------------------      5, 105. 98
         Total amount appropriated to June 30, 1937-------------                                              13, 646, 912. 50

         Fiscal year ending June 30                            1933           1934           1935           1936            1937


Cost of new work___
                  ..      __- _                 _        _ ____________    $14, 509. 17 $391, 078. 80 $193, 912. 03     --------    .
Cost of maintenance               ---------------- $24, 558. 82              3, 282. 45   83, 321.48    24, 379. 45       $22, 000. 16

      Total cost_----.      -----          __       --       24, 558. 82    17, 791. 62   474, 400. 28   218,291.48        22, 000. 16
Total expended__         ____--      ______.... .____        26, 103. 57    18, 296. 45   405, 251.49    284, 830.40       19, 610. 32

Allotted........    .......
                     _........__
                               __        __ ... .            26, 547. 08    497, 500. 00 210, 100. 00     13, 400. 00       7, 000. 00


Balance unexpended July 1, 1936------------------------------- $17, 716. 30
Amount allotted from War Department Appropriation Act approved
  April 26, 1934------------------------------                  17, 000. 00
      Amount to be accounted for------------------------------34, 716. 30
Deductions on account of revocation of allotment ----- ---------- 10, 000. 00

      Net amount to be accounted for---------------------------                                                         24, 716. 30
Gross amount expended---------------------------------                                                                  19, 610. 32

      Balance unexpended June 30, 1937--------------------__                                                             5,105.98
Outstanding liabilities June 30, 1937--_---------------------------                                                      5, 105. 98
Amount allotted from War Department Civil Appropriation Act ap-
   proved July 19, 1037--------------___          -------------------       27, 500. 00
Balance available for fiscal year 1938---------------------------           27, 500.00
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance 2           --------              -------      37, 500. 00
   SIncludes $599,500 Public Works funds, but exclusive of $325,000 expended from con-
tributed funds.
   2Exclusive of available funds.
                                        2. HURON HARBOR, OHIO

   Location.-On the south shore of Lake Erie at the mouth of the
Huron River, 47 miles westerly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 363.)
   Previous projects.-Adopted by River and Harbor Acts of May 20,
1826, and September 19, 1890. The total cost and expenditures were
$269,789.07. For further details see page 1961 of Annual Report for
1915.
   Existing project.-This provides for a pier 3,170 feet long on the
west side of the entrance channel, the shoreward 1,970 feet consisting
of timber cribs with concrete superstructure and the remaining 1,200
feet of a rubble-mound construction, with a timber-crib concrete
superstructure pierhead at its outer end; for a rubble-mound east
breakwater 1,450 feet long, with a concrete light foundation at its
1336    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

outer end, founded on thte rubble mound; for a steel-sheet pile shore
protection extending 200 feet westerly from near the shoreward end
of the west pier; for a channel with a depth of 26 feet in hard mate-
rial and 25 feet in soft material extending from deep water in the
lake to the south side of the Wheeling & Lake Erie Railway Co.'s
slip no. 1, at the entrance of the river, the channel to be 400 feet
wide in the lake and 300 feet wide inward of the outer pierhead,
narrowing to 250 feet at the head of the channel; and for an enlarged
turning basin, 19 feet deep, opposite the Wheeling & Lake Erie Rail-
way Co.'s ore dock.
   The project depth is referred to low-water datum for Lake Erie,
which is 570.5 feet above mean tide at New York. Ordinary fluctua-
tions of water level are from 3 feet above to 0.5 foot below low-water
datum, and extreme fluctuations, produced by wind and other causes,
are from 5.5 feet above to 2.5 feet below that plane.
   The estimate of cost of new work, revised in 1935, is $1,152,000,
exclusive of amount expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $12.500.
   The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1905, provided for the west pier, east
breakwater, channel of approach, and dredging the sheltered area
 (H. Doc. No. 122, 58th Cong., 2d sess.); act of March 2, 1919, pro-
vided for the removal of the old east pier, construction of new spur
pier, and the river widening to 200 feet, and enlargement of the
sheltered area (H. Doc. No. 5, 63d Cong., 1st sess.); and the act of
August 30, 1935, provided for extending the west pier, including a
pierhead at its outer end, removal of outer end of east breakwater,
constructing a new pierhead at new outer end of east breakwater,
widening and deepening channel to present project dimensions, en-
larging turning basin at the head of the channel, constructing shore
protection west of west pier and for eliminating from the project
the construction of a spur pier on the east side of the harbor entrance
and the sheltered outer harbor area outside the limits of the channel
 (H. Doc. No. 478, 72d Cong., 2d sess.). Prior to inclusion in the act
of August 30, 1935, extending west pier, constructing shore protec-
tion, removing 300 feet of east breakwater, constructing new east
pierhead, widening channel, and enlarging and deepening the turning
basin to 19 feet, were authorized by the Public Works Administra-
tion, November 15, 1933. The latest published map is in the last-
mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The Wheeling & Lake Erie Railway Co. has
deepened and maintained the channel above the limits of the Federal
improvement. This company has a dock with a frontage of over
1 mile, which affords facilities for handling iron ore, coal, sand, and
limestone, together with dock space for lumber, etc. Two fish docks
are private. The town of Huron owns a dock at the foot of South
Street which is open to the public. The facilities are regarded as
adequate for the needs of existing commerce. (See Lake Series No.
8, 1932, Corps of Engineers.)
   Operations and results during fiscal year--New work.-Deepening
the entrance channel to 25 feet in soft material by contract was in
           RIVERS AND HARBORS--BUFFALO,                  N. Y., DISTRICT          1337
progress. The contract work was about 91 percent completed and
the cost to the end of the fiscal year was $169,143.74 for new work.
   Maintenance.-The U. S. hopper dredge Burton removed 45,671
cubic yards of material for restoration of project depth in the inner
end of the entrance channel at a total cost of $7,227.91 for main-
tenance.
   The total cost for the year was $176,371.65, of which $169,143.74
was for new work and $7,227.91 for maintenance. The total
expenditure was $158,405.15.
   Condition at end of fiscal year.-The existing project is about 83
percent completed. Deepening the channel to 25 feet in soft material
is in progress and will be completed in 1937. Deepening the channel
to 26 feet in hard material remains to be done to complete the project.
The east rubble-mound breakwater and 1,970 feet of the west pier
were completed in 1908, except the extension to shore to close the
breach, which was completed in 1914. The extension of the west
pier 1,200 feet, removing the outer end of the east breakwater, widen-
ing the river, and enlarging the turning basin were completed in
1935. The old east pier was removed in 1919. The superstructure
on 1,190 feet of the west pier was renewed with concrete in 1925.
Settlement of the outer concrete section of the west pier and the old
west pierhead was checked by repairs made in 1922. The riprap
protection at the inner end of the west pier was repaired and ex-
tended in 1929, and 200 feet of steel sheet pile shore protection,
extending westerly from the riprap, was completed in 1934. The
harbor works are in good condition. The controlling depth in the
channel is 19 feet, low-water datum.
   The total cost of the existing project was $1,283,569.18, of which
 $963,054.34 was for new work and $320,514.84 for maintenance. The
total expenditure was $1,263,411.59.
   Proposed operations.-The balance unexpended at the end of the
year, together with an allotment of $13,000 made in July 1937, will
be applied as follows:
Accounts payable June 30, 1937----------------------------                   $20, 157. 59
New work: Completion of deepening entrance channel to 25 feet
  by contract, July 1937------------------------------------13,                   778. 64
Maintenance:
    Dredging by U. S. hopper dredge Burton, November
      1937__       -------------------------------------        $12, 500. 00
    Sweeping by hired labor, September 1937----------1, 000. 00
                                                                              13, 500. 00
       Total, new work and maintenance-----------------------                 47, 436. 23
  Redredging and sweeping are required annually. For these items
of maintenance, the additional sum of $18,500 can be profitably ex-
pended during the fiscal year 1939 as follows:
Dredging by U. S. hopper dredge Burton, fall 1938----------------- $17, 000
Sweeping by hired labor, fall 1938-------------------------------- 1, 500
       Total      ------------------------------------------------                18, 500
1338           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                 Cost and financial summary

Cost of new work to June 30, 1937---------------------                                                        $1, 232, 843. 41
Cost of maintenance to June 30, 1937  __----                                                                      320, 514. 84
      Total cost of permanent work to June 30, 1937__------ --                                                    1, 553, 358. 25
Minus accounts payable June 30, 1937-----      -   -        -__                                              -_       20, 157. 59
     Net total expenditures----- -
                            __._........                                                                          1, 533, 200. 66
                                    -------.-
Unexpended balance June 30, 1937____---                                                            __-                34, 436. 23
           Total amount appropriated to June 30, 1937 _____---__                                                  1, 567, 636. 89

           Fiscal year ending June 30                      1933              1934           1935            1936            1937


Cost of new work-___               -
                        -_______ __....                  ____-    ___    $13, 168. 88 $539, 955. 86       $8, 126. 78    $169, 143. 74
Cost of maintenance..-------------_                      $4, 753. 29       5, 970. 02    8, 298.47        13, 879. 87       7, 227. 91

      Total cost_-.-         -----------------            4, 753. 29     " 19, 138. 90   548, 254. 33     22, 006. 65     176, 371. 65
Total expended__            ...
                        _______________________          8, 318. 60        16, 355. 45   522, 626.68     48, 228. 01      158, 405. 15
Allotted       -------------------------------                   3. 50    520, 115.16     69, 400.00     131, 851. 52      53, 000.00,


Balance unexpended July 1, 1936 _________________--______ $139, 841.38
Amount allotted from War Department                                      Appropriation
Act approved Apr. 26, 1934---------------------- $7, 000. 00
Amount allotted from War Department Appropriation
Act approved May 15, 1936_____________________ 48, 000. 00
                                                                                                                        55, 000. 00
     Amount to be accounted for____________________________    194, 841. 38
Deductions on account of revocation of allotment__ __________---2, 000. 00

      Net amount to be accounted for ___ -__ __--- - -____----192,841. 38
Gross amount expended___________-______________              158, 405. 15
      Balance unexpended June 30, 1937------        _
                                                    ---------                                                           34, 436. 23
Outstanding liabilities June 30, 1937___--- ________-      $976. 94
Amount covered by uncompleted contracts________          32,959.29
                                                                                                                        33, 936. 23
     Balance available June 30, 1937 ______-- ___--_____--500.00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_ _____________---__-____                 __                                                     13, 000. 00
           Balance available for fiscal year 1938-- __--                                        -_____       __-        13, 500. 00
Amount (estimated)                     required to be appropriated for completion
   of existing project                 2                                                                             22, 000. 00
                                                                                                                    1________________________
Amount that can be profitably expended in fiscal year ending June
                             -   - - -
30, 1939, for maintenance 2_______    _________________                                                                18, 500. 00
   I Includes $561,251.52 Public Works funds.
   2 Exclusive of available funds.

                                        3. VERMILION HARBOR, OHIO

   Location.--This harbor is located at the mouth of Vermilion River,
which empties into Lake Erie at a point 37 miles by water westerly
from Cleveland, Ohio. (See U. S. Lake Survey Chart No. 35.)
   Existing project.--This provides for two parallel piers, 125 feet
apart, with an aggregate length of 2,200 feet, extending from the
shore at the mouth of the river to a natural depth of 10 feet in the
lake, and dredging a channel 100 feet wide and 12 feet deep below
low-water datum between the piers and beyond them to deep water
in the lake.
              RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                     1339
   The project depth is referred to low-water datum for Lake Erie,
which is 570.5 feet above mean tide at New York. Ordinary fluctua-
tions of water level are from 3 feet above to zero, low-water datum,
and extreme fluctuations produced by wind or other causes are from
5 feet above to 2 feet below that plane.
   The estimate of cost for new work, revised in 1903, was $127,692.
The latest (1918) approved estimate for annual cost of maintenance
is $2,000.
   The existing project was adopted by the following river and har-
bor acts: The act of July 4, 1836, made the original authorization
of work (no printed report); act of March 3, 1875, authorized the
12-foot depth (Annual Report for 1874, p. 219); and the act of
March 3, 1905, provided for the thorough repair of the piers (H.
Doc. No. 252, 58th Cong., 2d sess.). For the latest published map
see page 2128, Annual Report for 1909.
   Terminal facilities.-Fish is the only commodity handled by water
at the harbor. There are four fish docks and a marine railway for
small boats which are all privately owned, and one boat-club dock
which is open to the public. The village of Vermilion owns docks
at two street ends, which can accommodate small boats and are open
to the public. Terminal facilities are regarded as adequate for the
needs of existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1878. Repairs to the east pier are required. The con-
trolling depth in the entrance channel to inner end of west pier
is 12 feet at low-water datum.
   The total cost and expenditure of the existing project was $189,-
127.71, of which $133,277.55 was for new work and $55,850.16 for
maintenance.
  Proposed operations.-The allotment of $6,000, made in July
1937, will be applied to repairs to the piers by the U. S. derrick
boat Niagara,during August 1937.
  No work is proposed and no funds can be profitably expended
during the fiscal year 1939.
                                    Cost and financial summary
Cost of new work to June 30, 1937------------------------- $133, 277. 55
Cost of maintenance to June 30, 1937---------------------------- 55, 850. 16
      Total cost of permanent work to June 30, 1937----------- 189, 127. 71
Net total expenditures--------------     --------------------- 189, 127. 71
      Total amount appropriated to June 30, 1937-------------189; 127. 71

        Fiscal year ending June 30               1933          1934           1935         1936               1937

Cost of new work........                                                          --
Cost of maintenance-------------         ---- --------- ------------        $4,840.52 --------      -------
Total expended----------------------          __------------ ------------    3,035.78    $1,804.74------
Allotted.----------------.-.---.----------     -14,500   ------------       10,000.00   -5,159.48

Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-----------------------------------                                           $6,000.00
Balance available for fiscal year 1938_ ----
                                          _-_--------   --                                           6. 000. 00
1340    REPORT OF CHIEF OF:ENGINEERS, U. S. ARMY, 1937

                     4. LORAIN HARBOR, OHIO

   Location.-On the south shore of Lake Erie at the mouth of the
Black River, 28 miles westerly from Cleveland,; Ohio. (See U. S.
Lake Survey Chart No. 357.)
   Previous projects.-Adopted by River and Harbor Act of May 23,
1828. The total cost and expenditures were $292,202.88 for new work
and maintenance (not separable). (For further details see p. 1961
of Annual Report for 1915.)
   Existing project.-This provides for an outer harbpr about 60
acres in area formed by converging rubble-mound breakwaters with
an aggregate length of 6,350 feet and having an entrance 500 feet
wide between pierheads of timber cribs with concrete superstructure
located at the outer ends of the breakwaters; for two piers at the
mouth of the river 300 feet apart, the west pier of timber cribs with
concrete superstructure 1,003 feet long, and the east pier 1,875 feet
long, of which 1,763 feet is of timber cribs with concrete superstruc-
ture and 112 feet is of sheet pile and rubble-mound construction;
for a depth of 25 feet in soft material and 26 feet in hard material
iq the outer harbor and the river channel to a point 2,200 feet up-
stream from the outer ends of the piers, thence 24 feet deep in soft
material and 25 feet in hard material to the upper end of the Amer-
ican Shipbuilding Co. drydock no. 2; thence for a channel of the
same depths and generally 200 feet wide suitably widened at the
bends, to the upper end of the National Tube Co.'s dock; for an en-
larged turning basin 17 feet deep opposite the National Tube Co.'s
dock, no project dredging above dry dock no. 2 to be closer than 50
feet to existing and future docks or bulkheads; and fors an approach
channel 16 feet deep extending from the outer harbor to the munici-
pal pier.
   The project depth is referred to low-water datum for Lake Erie,
which is 570.5 feet above mean tide at New York. Ordinary fluc-
tuations of water level are from 3 feet above to 0.5 foot below low-
water datum, and extreme fluctuations, produced by wind and other
causes, are from 5 feet above to 2 feet below that plane.
   The estimate of cost for new work, revised in 1937, is $2,536,500,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $43,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1899, provided for the breakwater
system and the present dimensions of the entrance piers (H. Doc.
No. 131, 55th Cong., 2d sess., and Annual Report for 1898, p. 2718);
act of March 2, 1907, provided for widening Black River from the
inner end of the easterly Government pier to Erie Avenue Bridge
 (no printed report); act of August 8, 1917, provided for the present
dimensions of the breakwater (H. Doc. No. 980, 64th Cong., 1st sess.)
and for deepening the outer harbor and channel between piers to
the Erie Avenue Bridge (H. Doc. No. 985, 64th Cong., 1st sess.);
act of July 3, 1930, provided for extending the 20-foot channel to
the American Shipbuilding Co.'s dry dock no. 2 (H. Doc. No. 587,
69th Cong., 2d sess.); and the act of August 30, 1935, provided for
deepening the outer harbor and the river channel up to the National
Tube Co.'s dock, for enlarging the turning basin opposite that dock,
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT               1341
for widening two bends in the river, for dredging an approach chan-
nel in the outer harbor to the municipal pier (H. Doc. No. 469, 72d
Cong., 2d sess.; Senate Committee Print, 73d Cong., 2d sess., and
Rivers and Harbors Committee Doc. No. 51, 74th Cong., 1st sess.).
Prior to adoption by the act of 1935, the deepening of the outer har-
bor to 25- and 26-foot' depths, widening of two bends to 20-foot depth,
and of turning basin to 17-foot depth (H. Doc. No. 469, 72d Cong.,
2d sess.), had been authorized by the Public Works Administration
September 6, 1933. Under the same authority, maintenance dredg-
ing in the Black River from upper end of the Federal project to
the upper end of the National Tube Co.'s dock was authorized April
7, 1934. The latest published maps are contained in the three docu-
ments last mentioned.
   Local cooperation.-Fully complied with.
   Terminal facilities.--One iron ore and one coal terminal are owned
by the Baltimore & Ohio Railroad Co., together with dock space for
storage of sand, transshipment of lumber, etc., to or from cars, which
are open to the public. Extensive docks of the National Tube Co.
handle iron ore, limestone, and sand, and are not open to the public.
One dock for sand and two fish docks are privately owned. The
American Shipbuilding Co. has drydocks and facilities for building
and repairing the largest lake vessels. The city of Lorain owns a
public dock without rail connections which is open to the public.
Terminal facilities at Lorain Harbor are regarded as adequate for
the needs of existing commerce. (See Lake Series No. 8, 1932, Corps
of Engineers.)
   Operations and results during fiscal year--New work.-Dredging
a channel of approach to the municipal pier on the outer harbor by
contract was completed at a cost of $63,415.94.
   Maintenance.-Government plant and hired labor removed 242,940
cubic yards of material for restoration of 20-foot depth in the outer
harbor and in the channel in Black River at a total cost of $59,370.59.
   The total cost for the year was $122,786.53 of which $63,415.94 was
for new work, and $59,370.59 for maintenance. The total expendi-
ture was $129,681.71.
   Condition at end of fiscal year.-The existing project is about 49
percent completed. The harbor has been improved by the construc-
tion of parallel piers at the mouth of the Black River and by dredg-
ing a channel 20 feet deep, with a least width of 250 feet, in the river
up to the American Shipbuilding Co.'s drydock no. 2. An outer
harbor about 60 acres in area has been provided by constructing
breakwaters and by dredging to a depth of 20 feet. An approach
channel 16 feet deep from the outer harbor to the municipal pier
was provided in 1936. Deepening the outer harbor and the channel
to the upper end of the National Tube Co.'s dock remains to be done
to complete the project. The piers were completed in 1908; the
breakwaters, including pierheads, in 1915, except extension of west
breakwater to shore, which was completed in 1921. Rectification of
two bends and enlarging turning basin in Black River was completed
in 1934. At the end of the fiscal year the harbor works were gener-
ally in good condition.
   The controlling depth is 20 feet in the channels at low-water
datum.
1342              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The total cost of the existing project was $1,654,439.13, of which
$1,248,476.45 was for new work and $405,962.68 for maintenance.
The total expenditure was $1,653,407.52. In addition $3,000 was
expended from contributed funds for new work.
   Proposed operation.-The balance unexpended at the end of the
year, together with an allotment of $1,001,000 made in July 1937,
will be applied as follows:
Accounts payable June 30, 1937_-----------------                   $1, 031. 61
New work: Deepening river channel and part of the outer harbor
  by continuing contract, July 1937-38------------------------ 950,000.00
Maintenance :
    Dredging by U. S. hopper dredges Burton and
      Savannah, November 1937 and April 1938 .. - . $35, 700. 00
    Repairs to breakwaters by U. S. derrick boats
      Tonawanda and Niagara, July and Novem-
      ber 1937 --------------------------------------  14, 000. 00
    Sweeping by hired labor, October 1937 ------------  1, 938. 20
                                                                   51, 638. 20

            Total, new work and maintenance---------------------                                                         1, 002, 669. 81
     Funds are required to complete the new work continuing con-
tracts in force. Redredging and sweeping are required annually,
and repairs to breakwaters are necessary. For these items the addi-
tional sum of $259,500 can be profitably expended during the fiscal
year 1939 as follows:
New work: Completion of deepening river channel and part of the
  outer harbor by continuing contract July-November 1938------- $207, 000
Maintenance:
    Dredging by U. S. hopper dredge Savannah, fall 1938 and
      spring 1939------------------------------------       $35, 000
    Repairs to breakwaters by U. S. derrick boat Tonawanda,
      summer 1938 ---------------------------------- 15, 000
    Sweeping by hired labor, spring 1939------------------2, 500
                                                                     52, 500

            Total, new work and maintenance-------------________--                                                              259, 500
                                                     Cost and financial summary

Cost of new work to June 30, 1937 ___________-                                                  ______            1$1, 540, 679. 33
Cost of maintenance to June 30, 1937 -------------------                                                            -2405,
                                                                                                                      2    962. 68

      Total cost of permanent work to June 30, 1937--------                                                              1, 946, 642. 01
Minus accounts payable June 30, 1937                                                                                 -           031. 61
                                                                                                                              1,---------------------

     Net total expenditures__-__-___-                                               _______                       12.1, 945, 610. 40
Unexpended balance June 30, 1937                                                                                              669. 81
                                                                                                                           1,----------------------------
            Total amount appropriated to June 30, 1937-----                                                -      12     1, 947, 280. 21

           Fiscal year ending June 30                                1933           1934           1935           1936                 1937


Cost o' new work__...___.... __________-_ _ $83, 619. 96                         $88, 391. 45   $76, 608. 55    $1, 742. 18      $63, 415. 94
Cost of maintenance .....------------------- 10, 299. 85                          39, 385. 82    74, 590. 44    20, 962. 46       59, 370. 59

        Total cost..       .................--------------------   93, 919. 81   127, 777. 27   151, 198. 99    22, 704. 64      122, 786. 53
Total expended . .__...._........_.._...._                         93, 559. 30   102, 741. 97   176, 594. 80    14, 777. 85      129, 681. 71
Allotted __....... ...............---             __------         95, 568.97    278, 656. 47    10, 300. 00   147, 500. 00     -13,     000. 00

   1 Includes $165,000 Public Works funds, but exclusive of $3,000 expended from con-
tributed funds.
   2Includes $76,300 Public Works funds.
            RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                  1343
Balance unexpended July 1, 1936                                                    $144, 351. 52
Amount allotted from War Department Appropriation Act ap-
proved April 26, 1934______
                           ..________-_____                                           2, 000. 00
      Amount to be accounted for__________-_-------                                 146, 351. 52
Deductions on account of revocation of allotment ----------                          15, 000. 00
      Net amount to be accounted for-----------------------131,                          351. 52
Gross amount expended_ _______------_                                               129, 681. 71
      Balance unexpended June 30, 1937 _____------  -___----     1, 669. 81
Outstanding liabilities June 30, 1937---------------------------1, 669. 81

Amount allotted from War Department Appropriation Act ap-
proved July 19, 1937_____
                      -___---___                          1, 001, 000. 00

      Balance available for fiscal year 1938-----     _____----1, 001, 000.00
Amount (estimated) required to be appropriated for completion of
existing project --------------------------------         ---    488, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
    For new work ---------------------------------------                            207, 000. 00
   For maintenance              __---------------                                    52, 500. 00
                 --- -   - - - - - - - - - - - - - -   - - - - - - --- ----- ---
       Total                                                                        259,
                                                                                    2    500. 00
  s Exclusive   of available funds.

                                       5. ROCKY RIVER, OHIO

   Location.-This river rises in the northern part of Ohio and flows
into Lake Erie 7 miles west of Cleveland Harbor, Ohio. The im-
provement extends from the mouth of the river southerly about
3,000 feet. (See U. S. Lake Survey Chart No. 35.)
   Existing project.-This provides for an east entrance pier 900 feet
in length, and an entrance channel 100 feet wide and 10 feet deep
extending from that depth in the lake to a point 600 feet inside the
inner end of the pier.
   The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinarily fluctuations of water level are from 3 feet above to zero,
low-water datum, and extreme fluctuations produced by wind and
other causes are from 4.5 feet above to 1 foot below that plane.
   The estimate of cost for new work, revised in 1937, is $81,600.
The latest (1937) approved estimate of cost for annual maintenance
is $1,500.
   The existing project was adopted by the River and Harbor Act of
June 10, 1872 (Annual Report for 1871, p. 211) and modified by the
River and Harbor Act of August 26, 1937, to provide for extension of
the pier and for the present project dimensions (H. Doc. No. 70, 75th
Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that the extension of the pier shall not be undertaken until
local interests give assurances satisfactory to the Secretary of War
that they will provide a suitable landing with adequate service facili-
ties and highway connection, open to the users of the waterway on
equal terms to all. This condition has not been complied with.
       20196-37-pt. 1-            85
1344                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.-There is no commercial navigation at Rocky
River. The terminal facilities consist of private docks for pleasure
boats.
   Operations and results during fiscal year.-None.
   Condition at end of Afscal year.-The existing project is about 41
percent completed. The existing portion of the east pier was com-
pleted in 1875. The extension of the pier to a total length of 900 feet
and deepening of the channel to a depth of 10 feet at low-water
datum, as authorized by the River and Harbor Act of August 26,
1937, remains to be done to complete the project. The existing por-
tion of the pier is in need of minor repairs. The controlling depth in
the channel is 8 feet at low-water datum.
   The total cost and expenditure of the existing project was $49,-
580.44, of which $33,610 was for new work and $15,970.44 for
maintenance.
   Proposed operations.-The allotment of $3,000, made in July 1937,
will be applied to maintenance dredging in the channel with the
U. S. derrick boat Tonawanda in November 1937.
   It is considered desirable to extend the east pier and deepen the
channel to complete the project. For these items the additional sum
of $48,000 can be profitably expended during the fiscal year 1939 as
follows:
New work:
   Extension of east pier by contract, July 1938-39-----__--_--- _ $39, 000
   Dredging channel to a depth of 10 feet, by U. S. derrick boat
     Tonowanda, spring 1939-9,--------------------------------       9000
                     Total-----------___                          ---          -            ---             -------------------                   48, 000
                                                         Cost and financial summary

Cost of new work to June 30, 1937---------------------------                                                                             $33, 610. 00
Cost of maintenance to June 30, 1931 ---------            __-___-_________                                                                15, 970. 44
      Total cost of permanent work to June 30, 1937_____________ 49, 580.44
Net total expenditures--------------------------------------       49, 580. 44
Total amount appropriated to June 30, 1937---------------------49,     580.44

              Fiscal year ending June 30                                    1933                     1934        1935            1936               1937


Cost of new work ..........................
Cost of maintenance-__       -              __........._
                                         - __...      _.... __$5,
                                                               ...                                                000. 00 --     _           -_     -_ --
Total expended.....---------------------...............                 ----.......------------                 3,310. 40      $1, 689. 60   ------------

Allotted....----------------------....................       ----........ -----...                ----------- 5, 000.00 ...


Amount allotted from War Department Civil Appropriation                                                                           Act
approved July 19, 1937________________                                                                                                      $3,000. 00

    Amount available for fiscal year 1938_____________________                                                                                3,000.00
Amount (estimated) required to be appropriated for completion of
    existing project 1---                                  ----                        --------                                      -       48, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work    -----------------------------------                                                                               48, 000. 00
    'Exclusive               of available funds.
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT             1345
                   6. CLEVELAND    HARBOR, OHIO

   Location.-On the south shore of Lake Erie, at the mouth of the
Cuyahoga River, 176 miles westerly from Buffalo, N. Y. (See U. S.
Lake Survey Chart No. 354.)
   Previous projects.-Adopted by acts of March 3, 1825, June 23,
1866, March 3, 1875, August 5, 1886, and August 11, 1888. The
total cost and expenditures were $1,564,153.56 for new work and
maintenance (not separable). For further details see page 1962 of
Annual Report for 1915.
    Existing project.-This provides for an outer harbor 5 miles long
and 1,600 to 2,400 feet wide, enclosed by a breakwater system com-
prising an east breakwater 21,270 feet long, with a pierhead at its
easterly end, of which 3,300 feet is of timber-crib substructure with
stone superstructure and 17,970 feet of rubble-mound construction;
a west breakwater which is connected with the shore, 6,048 feet long,
comprising 5,847 feet of timber cribs with concrete superstructure,
and a gap of 201 feet; a rubble-mound spur breakwater 400 feet
long to protect the gap in the west breakwater shore arm; and for a
main entrance 700 feet wide between arrowhead rubble-mound break-
waters extending 1,250 feet lakeward from the 850-foot opening
between the main breakwaters, with timber-concrete pierheads at
their lakeward ends; for two parallel stone-filled timber-crib piers
with concrete superstructure, 325 feet apart, at the mouth of Cuya-
hoga River; the east pier 1,602 feet long and the west pier 1,440 feet
long; for a stone-filled wooden-pile wharf with concrete superstruc-
ture, and a reinforced-concrete storehouse at the foot of East Ninth
Street in the outer harbor; for a depth of 19 feet, with provisional
dredging to 23 feet, easterly from a line drawn perpendicular to the
east main breakwater, beginning 800 feet easterly from the westerly
end thereof, and a depth of 25 feet westerly from that line; for an
entrance channel, 25 feet deep, through the outer harbor and between
the piers up to the New York Central swing bridge; for maintaining
the channels in Cuyahoga and Old Rivers to 21 feet of such width as
is practicable without dredging closer than 40 feet to existing bulk-
heads except where necessary at bends, extending in Cuyahoga River
from below the New York Central bridge, the upstream limit of the
25-foot project, southward to the head of navigation above Clark
Avenue viaduct, a distance of about 51/4 miles, with a turning basin
18 feet deep about three-fourths of a mile below the head of naviga-
tion, and in Old River from its junction with the Cuyahoga River
westward a distance of about 1 mile, and for the improvement to a
depth of 21 feet of the channels described above by easing the bends
and widening the channels, by dredging only, in specified areas.
    The project depths are referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are from 3 feet above to 0.5 foot
below low-water datum, and extreme fluctuations produced by wind
and other causes are from 4.5 feet above to 1 foot below that plane.
    The estimate of cost for new work, revised in 1937, is $6,343,900.
The latest (1937) approved estimate of cost for annual maintenance is
 $175,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1875, provided for the west break-
1346     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  water (Annual Report for 1876, p. 558); act of August 5, 1886, pro-
vided for a part of the east breakwater (Annual Report for 1886, p.
  1865); the act of June 3, 1896, provided for rebuilding the piers and
completing the east breakwater (H. Doc. No. 326, 54th Cong., 1st
sess., and Annual Report for 1896, p. 2949) ; the act of March 3, 1899,
as modified by the act of June 13, 1902, provided for a channel be-
tween the piers and for 19-foot depth in the east and west outer har-
bor basins; dredging to 23 feet in any portion of the harbor in the
discretion of the Secretary of War, and provided for the main harbor
entrance and east breakwater extension (H. Doc. No. 156, 55th Cong.,
3d sess. and Annual Report for 1899, pp. 3075, 3078, and H. Doc. No.
118, 56th Cong., 2d sess.) ; the act of March 2, 1907, provided for the
wharf and storehouse (H. Doc. No. 270, 59th Cong., 2d sess.) ; the act
of June 25, 1910, provided for closing a gap in the east breakwater
  (report not printed) ; the act of July 27, 1916, provided for the pier-
head at the easterly end of the east breakwater (H. Doc. No. 891, 63d
Cong., 2d sess.); the act of August 8, 1917 (H. Doc. No. 707, 63d
Cong., 2d sess.), as modified by the act of August 26, 1937 (H. Doc.
No. 84, 74th Cong., 2d sess.), provided for the maintenance and im-
provement of the channels in Cuyahoga and Old Rivers; the Public
Works Administration, September 6, 1933, and the act of August 30,
1935, provided for deepening to 25 feet the outer harbor westerly
from a line drawn perpendicular to and 800 feet easterly from the
westerly end of the east main breakwater and an entrance channel up
to the New York Central Railroad Co.'s swing bridge; the construc-
tion of a spur breakwater 400 feet long at the gap in the shore arm
of the west breakwater; for the removal of the easterly 150 feet
of the west main breakwater; for eliminating from the project of a
298-foot southerly extension of the west pier; and for the abandon-
ment of the inner 932 feet of the shore arm of the west breakwater
 (H. Doc. No. 477, 72d Cong., 2d sess.), and the act of August 30, 1935,
provided for maintenance dredging in Cuyahoga and Old Rivers for
1 year as an emergency measure (Rivers and Harbors Committee
Doc. No. 39, 74th Cong., 1st sess.), which feature had previously
been authorized by the Public Works Administration. The latest
published maps are in Rivers and Harbors Committee Document
No. 84, Seventy-fourth Congress, second session.
    Local cooperation.-Maintenanceof the Cuyahoga and Old Rivers
channels is subject to the conditions that the city of Cleveland will
remove the unused bridge at West Third Street, and the abutments
thereof, and relieve the United States from all claims for damages
incident to dredging operations. These conditions were complied
with and approved May 22, 1936.
    Widening of the channels in the Cuyahoga and Old Rivers is sub-
ject to the conditions that local interests defray all cost of the modi-
fication or rebuilding of bridges, bulkheads, other structures and sub-
marine crossings, grant easements free of cost to the United States
for all lands required, and relieve the United States from all dam-
ages; provided further that when the above conditions are complied
within any of the prescribed cuts of the channels to be widened, the
United States will undertake the dredging thereof. These conditions
have not been complied with.
    TerminaZl facilities.-Outerharbor: The Pennsylvania Railroad Co.
operates an extensive ore terminal west of the river entrance. East
         RIVERS AND HARBORS-BUFFALO,          N. Y., DISTRICT     1347
of the river there are three slips providing wharves for coal-loading
machines and for passenger and packet-freight business, all of which
are privately owned and are open to shippers of commodities for
which the facilities are suited. East of the river there is also one
dock for shipment of automobiles, one dock for builders' supplies,
and one dock and terminal for packet-freight and automobile ship-
ment, all of which are private. The city of Cleveland owns two
wharves at the foot of East Ninth Street which are leased for passen-
ger terminals and one at the foot of East Fifty-third Street which
is leased for shipment of automobiles. The United States Engineer
Department owns a wharf at the foot of East Ninth Street, which is
private.
   Inner harbor: The Cuyahoga River, together with the Old River
and connecting slips, provides approximately 13 miles of wharves,
about 50 percent of which are used. One railroad company main-
tains a coal terminal and one has an ore terminal. Three railroads
have wharves for the transshipment of packet and miscellaneous
freight. These facilities are open to all shippers. Four companies
operating blast furnaces have private terminals for ore and limestone.
Two docks are equipped with grain elevators, which are not open to
the public. There are considerable quantities of sand, gravel, crushed
stone, oil, and fish handled over river docks by their private owners.
The facilities are considered adequate for the needs of existing com-
merce of Cleveland Harbor. (See Lake Series No. 5, 1931, Corps of
Engineers.)
   Operations and results during fiscal year.-Government plant and
hired labor removed 299,619 cubic yards of material for restoration
of project depth in the entrance channel, west basin, and a portion
of the east basin at a cost of $62,859.02. Government plant and hired
labor removed 71,341 cubic yards of material from the Cuyahoga and
Old Rivers at a cost of $27,335.12. Government plant and hired labor
made minor repairs to the east breakwater at a cost of $6,963.88.
Contract work restoring the Cuyahoga River Channel to a depth of
21 feet was completed in August 1936, 200,297 cubic yards of material
were removed at a cost of $87,270.39. Contract work for the removal
of 250,000 cubic yards of material in the Cuyahoga and Old Rivers
was in progress and was approximately 97 percent completed at a cost
of $97,857.26 to the end of the fiscal year. The total cost of mainte-
nance for the fiscal year was $282,285.67 and the total expenditure was
$275,671.88.
   Condition at end of fiscal year.-The existing project is about 91
percent completed. The river entrance channel has been improved by
the construction of parallel piers 325 feet apart and dredging to a
depth of 25 feet at low-water datum up to the New York Central
Railroad bridge. The piers were completed in 1900 and the dredging
in 1935. An outer harbor, about 1,300 acres in extent, has been
formed by the construction of an aggregate length of about 30,700
feet of breakwater, including converging arms, completed in 1915.
The main entrance has been widened to 700 feet and protected by
converging arms extending lakeward from the east and west break-
waters, completed in 1908. The outer harbor was deepened, 1933 to
1935, to 25 feet at low-water datum throughout the west basin, in
the entrance channel, and over a portion of the east basin adjacent to
the entrance channel, over the remaining portion of the east basin a
1348     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

depth of 23 feet at low-water datum has generally been secured. Re-
moval of 150 feet of easterly end of west breakwater and construction
of 400 feet of spur breakwater to protect the gap in the west break-
water shore arm were completed in 1935. A wharf was built at the
foot of East Ninth Street in 1910 and a storehouse in 1915. A concrete
base for a light tower was constructed at east end of east breakwater in
1917 in lieu of the east end pierhead. The harbor structures are gen-
erally in good condition. The breakwater requires some minor
repairs.
  The superstructure of the East Ninth Street wharf has been re-
placed with concrete.
  The widening of the channels in the Cuyahoga and Old Rivers and
the enlargement of the turning basin as authorized by the River and
Harbor Act approved August 26, 1937, remains to be done to com-
plete the project.
   At the end of the fiscal year the controlling depth in the main
entrance channel, through the west basin, and between the piers was
25 feet ; the channel through the east basin was 22 feet, in the channel
of the Cuyahoga and Old Rivers 21 feet, and in the turning basin 17
feet. Depths elsewhere in the east basin within the project area range
from 10 to 21 feet.
   The total cost of the existing project was $8,357,125.92, of which
$5,776,835.84 was for new work and $2,580,290.08 was for maintenance.
The total expenditure was $8,310,739.12. In addition, $50,000 was ex-
pended from contributed funds for maintenance.
  Proposed operations.-The balance unexpended at the end of the
year, together with an allotment of $90,100 made in July 1937,
will be applied as follows:
Accounts payable June 30, 1937-------------------------------$46, 386. 80
Maintenance:
    Completion of dredging Cuyahoga River by con-
      tract, July 1937--------------  ------------   $14,343.45
    Dredging by U. S. hopper dredges Burton, Sava'n-
      nah, and Taylor, November and December 1937
      and March 1938-------- -------------------- 72, 900. 00
    Repairs to breakwaters by U. S. derrick boat
      Tonawanda, December 1937 and April 1938         18, 000. 00
                                                                  105, 243.45

         Total   ------------------        -------            ---------     151, 630. 25
   It is considered desirable to improve the Cuyahoga River in the
vicinity of Collison Bend. Redredging and sweeping are required
annually and repairs to breakwaters are necessary. For these items
the additional sum of $493,500 can be profitably expended during the
fiscal year 1939 as follows:
New work, improving to a depth of 21 feet of Cuyahoga River in the
vicinity of Collison Bend, by dredging only, by contract, July 1938-
June 1939      -      -----------------------------                  $270, 000
Maintenance:
    Dredging of the Cuyahoga River by contract, in the
      spring 1939----------------------------------$135, 000
    Dredging by U. S. hopper dredges Burton, Taylor, and
      Savannah, spring 1939--------------------------- 56, 000
    Repairs to breakwater by U. S. derrick boat Tonawanda,
      fall 1938 and spring 1939-----_------.--                30, 000
    Sweeping by hired labor, fall 1938--                -2,        __     500
                                                                                223, 500
       Total, new work and maintenance-....          ------------               493, 500
                RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                                        1349
                                           Cost and financial summary
Cost of new work to June 30, 1937--________--------1                                                                $7, 340,989.40
Cost of maintenance to June 30, 1937-----------------------                                                          2, 580, 290. 08
     Total cost of permanent work to June 30, 1937---------                                                          9, 921, 279. 48
Minus accounts payable June 30, 1937--------.-.--------                                                                  46, 386.80

     Net total expenditures-----------------                                                                         9, 874, 892. 68
Unexpended balance June 30, 1937 --------    ---------..-                                                                61,530.25
          Total amount appropriated to June 30, 1937 ------------                                                    9, 936, 422. 93

      Fiscal year ending June 30                1933            1934                1935                     1936                1937


Cost of new work__ ___---_                     $8, 254. 38   $130, 415. 21      $315, 319.26           $171, 031. 56        ..------------
                            -
Cost of maintenance.............               61, 016. 76     20, 859. 19        50, 159. 17           153, 621. 57            $282, 285. 67
        Total cost   ----------------          69, 271.14     151, 275.40        365, 478. 43              324, 653. 13         282, 285. 67
Total expended___
                .......       ___ ....         22, 935. 99   -47, 703. 66        196, 304. 13              418, 232. 85         275, 671.88
Allotted_-----.---..-___..               _ -__. 5, 512. 88    321, 106. 04       314, 813. 39              105, 667. 03         150, 500. 00


Balance unexpended July 1, 1936              ___.      ----------                                                         $186, 702. 13
Amount allotted from War Department Appropria-
  tion Act approved April 26, 1934_______________  $5, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936 .__________-     165, 000. 00
                                                                                            --                             170  000 00
                                                                                                                           1IV, VVV. VV


      Amouiat to be accounted for .....                                                                                    356, 702. 13
Deductions on account of revocation of allotment_                                                                           19, 500. 00
      Net amount to be accounted for__                                                                                     337, 202. 13
Gross amount expended      -----------------------------------                                                             275, 671. 88

      Balance unexpended June 30, 1937--        _______________                                                             61, 530. 25
Outstanding liabilities June 30, 1937 --------------   $3, 702. 41
Amount covered by uncompleted contracts--------        57, 027. 84
                                                                                                                            60, 730. 25
     Balance available June 30, 1937_                                                                                             800. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_------      -----  -----                                                                            90, 100. 00
          Balance available for fiscal year 1938--- ---------------                                                         90, 900. 00
Amount (estimated) required to be appropriated for completion
of existing project 8  __ _----      -------------                                                                        567, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939: 3
   For new work 8         --------------------------                                                                       270, 000. 00
   For maintenance ------------------------------                                                                          223, 500. 00
          Total - - - - - - - - - - - -- - - - - - - - - - -       - - - - - - - -- - - -        --
                                                                                                      --                   493, 500. 00
  1   Includes $616,767.03 Public Works funds.
   2 Includes $125,000 Public Works funds but exclusive of $50,000 expended from con-
tributed funds.
   8 Exclusive of available funds.

                                      7. FAIRPORT HARBOR, OHIO

  Location.--On the south shore of Lake Erie, at the mouth of the
Grand River, 33 miles easterly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 346.)
1350    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Previous projects.--Adopted by River and Harbor Acts of March
3, 1825, and May 20, 1826. The total cost and expenditures were
$368,940.09 for new work and maintenance (not separable). For
further details see page 1963 of Annual Report for 1915.
   Existing project.-This provides for an outer harbor about 360
acres in area formed by a system of breakwaters comprising a west
breakwater, 3,878 feet long, connected with the shore and extending
500 feet lakeward of the east breakwater pierhead, consisting of 825
feet of timber-crib substructure with stone superstructure and sea
slope, 2,553 feet of rubble-mound construction, and 500 feet of cellular
steel-sheet piling with concrete caps; an east breakwater 6,750 feet
long, of rubble-mound construction; a west breakwater pierhead of
steel-sheet piling with concrete cap; and an east breakwater pierhead,
of timber-crib substructure, with concrete, superstructure, located
600 feet from the west breakwater; for an east river pier 1,252 feet
long, 578 feet of timber-crib substructure with concrete superstruc-
ture, the inner 674 feet not maintained; for the removal of the
old west pier; for the construction of a bulkhead 500 feet long and
300 feet west of the westerly face of the east pier; for a depth of
25 feet in soft material and 26 feet in hard material in the outer
harbor; for a channel in Grand River 24 feet deep and 200 feet
wide extending from the outer harbor a distance of 2,000 feet up-
stream from the outer end of the east entrance pier; thence of the
same depth with a width of 150 feet to the angle in the ore terminal,
a further distance of 1,700 feet; and thence with a depth.of 21 feet
and with widths varying from 200 to 100 feet for a distance of 4,000
feet to the end of the stone receiving terminal of the Diamond
Alkali Co., with a turning basin 18 feet deep, 760 feet long, and 400
feet wide about midway in this section.
   The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are between 3 feet above and
0.5 foot below low-water datum, and extreme fluctuations, produced
by wind and other causes, are from 4 feet above to 1 foot below that
plane.
   The estimated cost of new work, revised in 1937, is $2,623,000,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $27,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1825, modified by the acts of 1830,
1881, and 1890, provided for the piers; the acts of March 24, 1896,
and June 3, 1896, modified by the act of March 3, 1905, provided for
the breakwaters (H. Doc. No. 347, 54th Cong., 1st sess., and Annual
Reports for 1903, p. 2084, and 1905, p. 2349), the act of March 2,
1919, provided for a 1,400-foot extension of the east breakwater, for
the present dimensions of the east pier, and for the dredging (H. Doc.
No. 206, 63d Cong., 1st sess.); the act of January 21, 1927, modified
by the act of July 3, 1930, provided for a 4,000-foot extension
of the east breakwater at a limit of cost to the United States of
$715,000 (H. Doc. No. 592, 69th Cong., 2d sess.); the act of August
30, 1935, provided for deepening the outer harbor and entrance
channel to 25 feet in soft material and 26 feet in hard material; for
extending the west breakwater 500 feet lakeward, including a pier-
         RIVERS AND HARBORS-BUFFALO,          N. Y., DISTRICT     1351
head at its outer end; for removing the west pier at the mouth of
Grand River; and for the construction of a bulkhead in the west
side of the channel, 500 feet in length (H. Doc. No. 472, 72d Cong.,
2d sess.); and the act of August 26, 1937, provided for the channel
with depths of 24 feet and 21 feet and turning basin with depth of
18 feet in the Grand River (Rivers and Harbors Committee Doc. No.
79, 74th Cong., 2d sess.). Prior to adoption by the River and Harbor
Act of August 30, 1935, the modified project contained in House
Document No. 472, Seventy-second Congress, second session, excepting
the 25- and 26-foot depths in the outer harbor and entrance channel,
had been authorized November 15, 1933, by the Public Works Ad-
ministration. The latest published map is in Rivers and Harbors
Committee Document No. 79, Seventy-fourth Congress, second
session.
   Local cooperation.-The River and Harbor Act of January 21,
1927, requires local interests to contribute $304,000 toward the cost
of extending the breakwater 4,000 feet and dredge the channel of
approach to their terminal at their own expense. The River and
Harbor Act approved July 3, 1930, waived the condition reqluiring
local interests to contribute to the cost of the breakwater extension.
The condition requiring dredging has not been complied with.
   The River and Harbor Act of August 26, 1937, provides that the
deepening of the outer harbor and the improvements in Grand
River shall not be undertaken until local interests furnish, free of
cost to the United States, all lands or easements necessary for widen-
ing or deepening the tiver channel and for enlarging the turning
basin, release the United States from all claims for damages to
lands and structures in Grand River because of the dredging opera-
tions, and give assurances satisfactory to the Secretary of War that
they will deepen vessel berths at the iron ore and stone terminals
to an extent sufficient for the full utilization of the increased depths
to be provided in the Federal project. These conditions have not been
complied with.
   Terminal facilities.-The Baltimore & Ohio Railroad Co. has
obtained and maintained a channel in the river with an available
depth of 18 feet at low-water datum for about 1 mile above the
limits of the Federal project.
   The Fairport, Plainesville & Eastern Railroad Co. has extended
this channel about 2,200 feet farther upstream to afford access to
docks in connection with the Diamond Alkali Co. One large ore
terminal, one coal dock, and one dock equipped with a warehouse for
miscellaneous freight and elevator for handling grain do a general
public business. One limestone dock, four fish docks, and one dock
equipped with a derrick for handling small pleasure craft are
privately owned. There are no publicly owned terminals. The
facilities are regarded as adequate for the needs of existing commerce.
   Operations and results during fiscal year-Regular funds-Main-
tenance.-Government plant and hired labor removed 130,629 cubic
yards of material for restoration of 19-foot depth in the entrance
channel and outer harbor at a cost of $24,706.62. Government plant
and hired labor made minor repairs to the east and west breakwaters
and removed obstructions in the entrance channel and outer harbor
1352     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

at a cost of $5,958.15. The total cost of maintenance for the fiscal
year was $30,664.77 and the total expenditure was $31,421.79.
   Public Works funds-New work.-The cost and expenditure of
$250 was for reimbursing liquidated damages on the contract for the
construction of the 500-foot cellular steel sheet piling extension to
the west breakwater.
   The total cost for the year, all United States funds, was $30,914.77,
of which $250 was for new work and $30,664.77 for maintenance.
The total expenditure was $31,671.79.
   Condition at end of fiscal year.-The existing project is about 67
percent completed. The harbor has been improved by the construc-
tion of parallel piers 190 feet apart at the mouth of the Grand River.
The west pier is 788.2 feet long and the east pier 1,252 feet long. The
inner 674 feet of the east pier has not been maintained and has fallen
into decay. The piers were completed in 1904. Two outer break-
waters have been constructed with a total length of 10,628 feet,
sheltering an area of about 360 acres. An area of about 62 acres has
been dredged to a depth of 19 feet in the east and west basin of the
outer harbor and an entrance channel, 19 feet deep, has been dredged
outside the breakwater and between the piers.
   Removal of the old west pier, widening of river channel and en-
larging of the turning basin, construction of bulkhead on west side
of the widened channel, and deepening the outer harbor and river
channel remains to be done to complete the existing project.
   The controlling depth in the channel and the outer harbor is 19
feet, and in Grand River channel 18 feet, at low-water datum. The
harbor works are in good condition except for some minor repairs
to breakwaters.
   The total cost of the existing project from regular funds was
$2,066,639.63, of which $1,570,068.88 was for new work and $496,570.75
for maintenance. The total expenditure was $2,066,575.20. The total
cost and expenditure of the existing project from Public Works
funds was $187,772.04 for new work.
   The total cost of the existing project, all United States funds,
was $2,254,411.67, of which $1,757,840.92 was for new work and
$496,570.75 for maintenance. The total expenditure was $2,254,347.24.
   Proposed operations.-The balance unexpended at the end of the
year, together with allotment of $486,000 made in July 1937, will
be applied as follows:
Accounts payable June 30, 1937---------------------------------      $64.43
New work: Deepening part of the outer harbor, removal of west
pier, widening the mouth of Grand River, and bulkhead con-
struction, by contract, season of 1938----------------------- 462, 000. 00
Maintenance:
    Dredging by U. S. hopper dredges Burton and
      Taylor, December 1937 and April 1938----------$22, 371. 20
    Sweeping by hired labor, May 1938 ---------------- 2, 00.00
                                                                 24, 371. 20
       Total, new work and maintenance----------------------_     486, 435. 63
  It is considered desirable to complete the project. Redredging
and sweeping are required annually and repairs to breakwaters are
necessary. For these items the additional sum of $448,000 can be
profitably expended during the fiscal year 1939 as follows:
                  RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                                 1353
New work:
   Deepening the remaining portion of the outer harbor
     by contract, July 1938-39-----------   ------------ $125, 000
   Deepening the river channel and turning basin by con-
     tract, July 1938-39---------------------------- 278, 000
                                                                                                                          $403, 000
Maintenance:
   Dredging by U. S. hopper dredge Taylor, fall 1938 and
      spring 1939 ----------------------------------      28, 000
   Repairs to breakwaters by U. S. derrick boat Tona-
      wanda, summer 1938------------------- --------       15, 000
   Sweeping by hired labor, spring 1939------------------2, 000
                                                                                                                             45, 000

         Total, new work and maintenance------------------------                                                           448, 000

                                             Cost and financial summary
Cost of new work to June 30, 1937---------------------------1 $2, 126, 781. 01
Cost of maintenance to June 30, 1937------------------------      496, 570. 75
     Total cost of permanent work to June 30, 1937--------                                                           2, 623, 351.76
Minus accounts payable June 30, 1937__--- -------------                                                                       6------4.43
     Net total expenditures -- --------    ----------------                                                         12, 623, 287. 33
Unexpended balance June 30, 1937 ----------------------------                                                               435.63
         Total amount appropriated to June 30, 1937------------                                                      2, 623, 722. 96

   Fiscal year ending June 30                     1933                1934              1935               1936             1937


Cost of new work-...............                $52, 267. 74       $52, 623. 18     $131,943. 18        $51, 635. 71          $250.00
Cost of maintenance.............                  7, 933. 88        19, 796.43         7, 908. 06        37, 137. 14        30, 664. 77
      Total cost.................               60, 201.62          72, 419. 61      139, 851. 24        88, 772. 85        30, 914. 77
Total expended---....--....---                 - 56, 522. 39        76, 943.37         92, 313. 44      135, 703. 63        31, 671. 79
Allotted _..--...- .         -      ----.....
                                         ...  106, 703. 47         385, 955. 78    -137,700.00           52, 322. 04      -14, 750. 00


Balance unexpended July 1, 1936     -     ______        _      $46, 857. 42
Amount allotted from National Industrial Recovery Act approved
June 16, 1933---------------------------------------------         250. 00
     Amount to be accounted for----_---------------------                                                               47, 107. 42
Deductions on account of revocation of allotment                                    ---------------                     15, 000. 00
      Net amount to be accounted for___ -______- ______-_                                                               32, 107. 42
Gross amount expended-----------------------------------                                                                31, 671. 79
      Balance unexpended June 30, 1937------------------------                                                              435. 63
Outstanding liabilities June 30, 1937--- -------          -435.                                                                  63

Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937------      ---------------------- ---                                                         486, 000. 00
Balance available for fiscal year 1938-----------------_______                                                         486, 000. 00
Amount (estimated) required to be appropriated for completion
                                  - - -- - -- - -
of existing project 2______________________________________                                                           403, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work - - - - - - - - - - - - - - - - - -         -------                                                    403, 000. 00
   For maintenance 2- - - - - - - - - - - - - - - - - - - - -- - - - - -                                                45, 000. 00
                       - - - - -- - - - - - - - - - -    --    - - - -- - - - - - - - - - - - - - - - - - - - - -
         Total                                                                                                         448, 000. 00
  1 Includes $187,772.04 Public Works funds.
  2 Exclusive of available funds.
1354     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                   8. ASHTABULA HARBOR, OHIO

   Location.-On the south shore of Lake Erie, at the mouth of the
Ashtabula River, 59 miles easterly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 342.)
   Previous projects.-Adopted by River and Harbor Acts of May 20,
1826, and March 3, 1829; July 3, 1832; March 2, 1867; June 10, 1872;
and March 3, 1881; and modified by the Secretary of War July 8,
1890. The total cost and expenditures were $565,192.27 for new work
and maintenance (not separable). For further details see page 1963
of Annual Report for 1915.
   Existing project.-This provides for an outer harbor about 185
acres in area protected by breakwaters, the west breakwater 7,780 feet
long, and the east breakwater 4,400 feet long, all of rubble-mound
construction, except 430 feet of the west breakwater, which consists
of timber-crib substructure, stone superstructure; for a west pier-
head of timber-crib substructure and concrete superstructure; for an
east light foundation located 600 feet easterly from the west pier-
head, consisting of a concrete superstructure founded on the outer
end of the rubble-mound east breakwater; for the removal of 250 feet
of the old inner east breakwater and of such additional length as may
be necessary; for an entrance 28 feet deep between existing break-
waters 600 feet apart; thence a channel of 25-foot depth and 1,100-
foot maximum bottom width through the outer harbor to the old inner
east breakwater; thence 24 feet deep to the mouth of Ashtabula
River; thence a channel 24 feet deep with a bottom width of 160 feet
to a point 2,000 feet upstream; thence a channel 18 feet deep (ex-
cept where ledge rock may be encountered) with a bottom width of
160 feet, decreasing to 100 feet and suitably widened at the southerly
end, to the upper car-ferry slip; thence a channel 16 feet deep (ex-
cept where ledge rock may be encountered) with a bottom width of
100 feet suitably widened at bends and in the turning basin, to the
southerly end of the turning basin; also an approach channel 24 feet
deep, with a minimum width of 250 feet from the 24-foot depth sec-
tion of the outer harbor eastward to the New York Central Railroad
Co.'s slip; and for maintenance to 21 feet depth of that portion of
the outer harbor between the deepened channel and a meridian line
through the westerly angle of the east breakwater.
   The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are between 3 feet above and
0.5 foot below low-water datum, and extreme fluctuations, produced
by winds or other causes, are from 4 feet above to 1 foot below
low-water datum.
   The estimated cost of new work, revised in 1937, is $3,181,000, ex-
clusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $18,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for the breakwaters
(Annual Report for 1895, p. 3122); act of March 3, 1905, provided
for extending the west breakwater shoreward (no printed report);
act of June 25, 1910, provided for enlarging the outer harbor by
extending the west breakwater lakeward and shoreward and by con-
structing a new east breakwater, for pierheads, and for the removal
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT               1355
of a part of the old east breakwater (H. Doc. No. 654, 61st Cong.,
2d sess.); act of March 2, 1919, provided for connecting the west
breakwater with the shore and for dredging in the outer harbor
 (H. Doc. No. 997, 64th Cong., 1st sess.) ; act of August 30, 1935, pro-
vided for the extension of the west and east breakwaters lakeward
600 and 700 feet, respectively; for the removal of 800 feet of the
east outer breakwater; and for removing dredging restrictions in a
portion of the west basin (H. Doc. No. 43, 73d Cong., 1st sess.) ; and
the act of August 26, 1937, provided for maintenance to 21-foot depth
of a portion of the outer harbor, the channel through the outer har-
bor, for the channel in Ashtabula River, for the channel of ap-
proach to the New York Central Railroad Co.'s slip and for removal
of a portion of the old inner east breakwater (Rivers and Harbors
Committee Doc. No. 78, 74th Cong., 2d sess.). Prior to adoption by the
River and Harbor Act of 1935, extension of the east and west break-
waters, removal of a portion of both the east outer and east inner
breakwaters had been authorized by the Public Works Administra-
tion September 6, 1933. The latest published map is in Rivers and
Harbors Committee Document No. 78, Seventy-fourth Congress, sec-
ond session.
    Local cooperation.-The River and Harbor Act approved August
26, 1937, provides that the deepening of the outer harbor and river
channels to 24 feet or more shall not be undertaken until local inter-
ests give assurances satisfactory to the Chief of Engineers that they
will deepen vessel berths and slips to an extent sufficient to ade-
quately utilize and to justify the cost of the increased depth to be
provided by the Federal Government. These conditions have not
been complied with.
    Dredging in the 18 and 16 foot depth sections of the river channel
is subject to the condition that local interests provide adequate bulk-
heads for channel protection, or release the United States from all
claims for damages to riparian property that may occur in carrying
out the channel improvements. This condition was complied with
and approved June 30, 1936.
    Terminal facilities.-Extensive ore and coal terminals are owned
by the New York Central Railroad Co. along the east side of the
river and the slip 1,000 feet easterly thereof, and by the Pennsyl-
vania Railroad Co. along the west side of the river. These comprise
three ore and two coal docks equipped with mechanical appliances
and are open for general public business. These railroads have an
aggregate developed dock frontage of 18,500 feet. The Pennsyl-
vania Railroad also has terminal facilities for a car ferry plying
between Ashtabula and Port Burwell, Ontario, Canada. There are
three privately owned fish docks and a large shipyard and drydock.
The terminal facilities are considered adequate for the needs of ex-
isting commerce.
   Operations and results during fiscal year.-Government plant and
hired labor removed 55,456 cubic yards of material for restoration
of 20-foot depth in the outer harbor at a cost of $14,163.43. Govern-
ment plant and hired labor made minor repairs to the breakwaters
and removed obstructions in the outer harbor at a cost of $12,320.55.
Maintenance dredging in the Ashtabula River was done by contract,
87,174 cubic yards of material were removed at a cost of $43,741.62.
1356      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

The total cost of maintenance for the fiscal year was $70,225.60 and
the total expenditure was $70,603.13.
   <Condition at end of fiscal year.-The existing project is about 72
percent complete. Under the existing project as first adopted a west
breakwater 3,380 feet long and an east breakwater 1,200 feet long
were built, affording an outer harbor of limited area. Under the
provisions of the River and Harbor Acts of June 25, 1910, and
March 2, 1919, the west breakwater was extended shoreward and
lakeward to an aggregate length of 7,180 feet; a new outer east
breakwater 4,500 feet long was built; the east and west breakwaters
were terminated with pierheads at their outer ends; and the outer
600 feet of the old east breakwater was removed. The breakwater and
pierheads were completed in 1915 and the extension of the west
7breakwater to shore, provided by River and Harbor Act of March 2,
1919, in 1923. Deepening the westerly 800 feet of the east basin was
completed in 1933. Extending the east and west breakwaters lake-
ward and removing the westerly end of the east breakwater and the
westerly end of the east inner breakwater was completed in 1935.
The harbor works are generally in good condition.
   The controlling depth is 20 feet in the channel through the outer
harbor, east basin and in the approach channel to the New York Cen-
tral Railroad Co.'s slip, 19 feet in the Ashtabula River channel to a
point 2,000 feet upstream from its mouth, 18 feet to the upper car-
ferry slip, 16 feet to the turning basin, and 14 feet in the turning
basin.
   The work remaining to be done to complete the existing project is
that authorized by the River and Harbor Act of August 26, 1937,
consisting of the conditional removal of the east inner breakwater,
the deepening of the channel through the outer harbor and the ap-
proach channel to the New York Central Railroad Co.'s slip, and
deepening and widening the channel in the Ashtabula River, includ-
ing the turning basin. The portion of the outer harbor to be main-
tained to 21 feet depth has not been deepened to that depth, shale
rock being above project depth over a portion of the area.
   The total cost of the existing project was $2,724,959.73, of which
$2,306,105.65 was for new work and $418,854.08 was for maintenance.
The total expenditure was $2,724,927.28.
   Proposed operations.-The balance unexpended at the end of the
year together with allotment of $381,800 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937--------------------------------         $32.45
New work: Deepening a portion of outer harbor by contract, season
  of 1938-----------------------------------------------          360, 000. 00
Maintenance :
    Dredging by U. S. hopper dredges Burton and Tay-
      lor, November 1937 and April 1938------------- $20, 276. 36
    Sweeping by hired labor, May 1938----------------2, 000. 00
                                                                   22, 276. 36

       Total, new work and maintenance----------------------       382, 308. 81
  It is considered desirable to complete the project. Redredging and
sweeping are required annually and repairs to break waters are neces-
sary. For these items the additional sum of $557,000 can be profitably
expended during the fiscal year 1939 as follows:
                  RIVERS AND HARBORS--BUFFALO, N. Y., DISTRICT                                                                 1357
New work:
   Deepening the remaining portion of the outer harbor by
     contract, July 1938-39       -------------------------  $155,000
   Deepening the approach channel to the New York Central
     Railroad Co.'s slip, by contract, July 1938-39---------  175, 000
   Deepening the river channel by contract, July 1938-39__- 185, 000
                                                                                                                           $515, 000
Maintenance :
   Dredging by U. S. hopper dredges Savannah and Burton,
     fall 1938 and spring 1939 ----- ____-------------25, 000
   Repairs to breakwater by U. S. derrick boat Tonawanda,
      fall 1938_ -----------------------------------      15, 000
   Sweeping by hired labor, spring 1939------------------  2, 000
                                                                                                                              42, 000

           Total, new work and maintenance ----------------                                                                 557, 000
                                             Cost and financial summary
Cost of new work to June 30, 1937___----------------------- 1$2, 871, 297. 92
Cost of maintenance to June 30, 1937 ----------------------      418, 854. 08
     Total cost of permanent work to June 30, 1937 ---------- 3, 290, 152. 00
Minus accounts payable June 30, 1937 -----------------------           32. 45

     Net total expenditures______----___-____----                                                               13, 290,119. 55
Unexpended balance June 30, 1937                           __----------------------__                                   508. 81
          Total amount appropriated to June 30. 1937__-------------                                             '3,   290, 628. 36

    Fiscal year ending June 30                    1933              1934                 1935            1936                 1937


Cost of new work........---------------..      $31, 808. 53        $1,291. 51         $187, 062. 39   $348, 294. 48 -
Cost of maintenance-------------....... ..      23, 630. 34        15,117. 23            8,025. 21      16, 841. 14         $70, 225.60
       Total cost----------------               55, 438.87         16, 408. 74         195, 087. 60    365, 135. 62          70, 225. 60
Total expended....-----------------53, 627. 82                     17, 664. 13         138, 853. 88    421, 515. 02          70, 603. 13
Allotted.....-----------------------            70, 715.88        439, 408. 53          56, 700. 00     81, 948. 38          54, 000. 00


Balance unexpended July 1, 193(       ___,__-                                                                         $17, 111. 94
Amount allotted from War Department Appropriation Act, ap-
  proved May 15, 1936-------------------------------------                                                                55, 000. 00
     Amount to be accounted for----------------------------                                                               72, 111. 94
Deductions on account of revocation of allotment                                                                            , 000. 00
                                                                                                                           1--------------
      Net amount to be accounted for-------_______________                                                                71, 111.94
Gross amount expended-------_---------------                                                                              70, 603. 13
      Balance unexpended June 30, 1937------------_________                                                                   508. 81
Outstanding liabilities June 30, 1937- -------------------__ _                                                                508. 81
Amount allotted from War Department Appropriation Act, ap-
  proved July 19, 1937-----------     ---------       -----------                                                     381, 800. 00
Balance available for fiscal year 1938----------------------____                                                      381, 800. 00
Amount (estimated) required to be appropriated for comple-
                            - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -
tion of existing project 2_________________                                                                          515, 00. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: 2 - - - - - - - - -
   For new work 2- - - - - - - -- -- -- -- - -- -- -- -- -- -- --- -- -- -- -- ----- - - -- -- -- - - - - - -         515, 000. 00
                                                                                                  - - -- - -          -
      for maintenance                                                                                                     42, 000. 00
         Total2- -- - - - -- - --- - - - --- - - - - - - - - - - - - - - -       --                                   557, 000. 00
   1 Includes $536,648.38 Public Works funds.
   2 Exclusive       of available funds.
1'358   REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                    9. CONNEAUT HARBOR, OHIO

   Location.-On the south shore of Lake Erie, at the mouth of the
Conneaut River, 73 miles easterly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 33.)
   Previous projects.--Adopted by River and Harbor Acts of March
2, 1829, July 13, 1892, February 24, 1893, and June 3, 1896. The
total cost and expenditures were $845,055.69, of which $805,271.72
was for new work and $39,783.97 was for maintenance after 1903.
 (For further details see p. 1964 of Annual Report for 1915.)
   Existing project.-This provides for an outer harbor, the deepened
portion of which is about 142 acres in area, formed by a system of
breakwaters comprising a west breakwater 5,965 feet long, connected
with the shore, with a 100-foot gap 1,670 feet from shore, all of
rubble-mound construction; an east breakwater 3,675 feet long, 2,625
feet of which is of rubble-mound construction and 1,050 feet of tim-
ber cribs with concrete superstructure; a west breakwater pierhead
of timber-crib substructure with concrete superstructure; an east
breakwater light foundation of concrete superstructure founded on
the outer end of the rubble mound; and for an entrance 600 feet
wide between the west breakwater pierhead and the east break-
water light foundation; for an east pier 1,008 feet long of timber-
crib substructure and concrete superstructure; and for a depth of 25
feet in soft material and 26 feet in hard material in the eastern
portion of the outer harbor and for a depth of 20 feet in the re-
mainder of the outer harbor, consisting of a triangular area with
its apex about 900 feet southerly from the west breakwater pierhead,
its southeasterly angle 800 feet westerly from the west pier, its south-
westerly angle 100 feet from the west breakwater.
   The project depth is referred to low-water datum for Lake Erie,
which is 570.5 feet above mean tide at New York. Ordinary fluctua-
tions of water level are between 3 feet above and 0.5 foot below low-
water datum, and extreme fluctuations, produced by wind and other
causes, are from 4 feet above to 1 foot below low-water datum.
   The estimate of cost for new work, revised in 1937, is $3,818,300,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $11,500.
The existing project was adopted by the following river and harbor
acts: The act of June 25, 1910, provided for the breakwaters and
pierheads and the removal of a portion of the old west breakwater
 (H. Doc. No. 653, 61st Cong., 2d sess.); act of August 8, 1917, pro-
vided for realinement of the west breakwater, for removing all the
old west breakwater, and for dredging to 20 feet (H. Doc. No. 983,
64th Cong., 1st sess.) (a permit issued to the Bessemer & Lake Erie
R. R. Co. by the Secretary of War on Aug. 5, 1927, provided
for the removal of the inner 645 feet of the west pier); and the
act of August 30, 1935, provided for constructing the west break-
water shore arm; constructing lakeward extensions of the east and
west breakwaters; the removal of the lakeward ends of the east and
west river piers; removing the outer arm of the west breakwater;
dredging the easterly portion of the outer harbor to a depth of
25 feet in soft material and 26 feet in hard material, and the re-
mainder of the outer harbor to a depth of 20 feet; and for eliminating
from the project a former provision for extending the west break-
         RIVERS AND HARBORS-BUFFALO.         N. Y., DISTRICT     1359
water shoreward 255 feet (H. Doc. No. 48, 73d Cong., 1st sess.).
Prior to adoption by the act of 1935, the construction of the west
breakwater shore arm and the lakeward extensions of the east and
west breakwaters, the removal of the lakeward ends of the east and
west river piers, and of the lake arm of the west breakwater, had
been authorized by the Public Works Administration September 6,
1.933. The latest published maps are in the two documents last
mentioned.
   Local cooperation.-Deepeningthe outer harbor is subject to the
conditions that local interests give assurances satisfactory to the
Secretary of War that the inner harbor, including terminals, will be
improved to accommodate vessels of 24-foot draft from the Federal
project limits to the ore docks and of 20-foot draft to the coal docks.
These conditions were complied with March 24, 1937. All prior con-
ditions have been fully complied with.
   Terminal facilities.-The railroad and dock companies have ob-
tained and maintained a channel in Conneaut River 20 feet deep at
low-water datum from the upper limits of the Federal project to a
point about 3,000 feet above the outer ends of the piers. The Pitts-
burgh, Bessemer & Lake Erie Railroad Co. and the Pittsburgh &
Conneaut Dock Co., both subsidiaries. of the United States Steel
Corporation, own about 6,800 feet of improved dock frontage con-
sisting of one ore dock, one coal-loading dock, and one steel-products
dock. There is in the outer harbor one private fish dock and one city-
owned dock which will accommodate small boats of shallow draft.
The terminal facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Government plant and
hired labor removed 97,489 cubic yards of material for restoration of
20-foot depth in the outer harbor at a cost of $15,865.64 for mainte-
nance. The total expenditure was $24,052.88.
   'Condition at end of fiscal year.-The existing project is about 56
percent completed. Under existing project a length of 4,445 feet of
the new west breakwater was completed in 1916; the old east break-
water, 1,050 feet long, has been extended shoreward 800 feet (com-
pleted 1911) and lakeward 900 feet (completed 1923). The west
breakwater was extended shoreward 1,670 feet (completed 1934).
Extension of the west breakwater 830 feet lakeward, the east break-
water 925 feet lakeward, and removal of the lake arm of the west
,breakwater were completed in 1935; 642 feet of the old west break-
water was removed in 1916 and the remaining 600 feet in 1925. Two
piers have been constructed at the mouth of the Conneaut River.
Removal of west pier and 459 feet of east pier was completed in
1934. The east pier is now 1,008 feet long. The entrance channel
through the outer harbor and between the piers was dredged to 20
feet in 1919. The harbor structures are generally in good condition.
The rubble-mound breakwaters require minor repairs.
    The controlling depth in the outer harbor is 20 feet except for a
strip about 600 feet wide in the southerly part of the west basin and
a strip 100 to 400 feet wide in the southerly part of the east basin.
    The work remaining to be done to complete the project is to dredge
the eastern portion of the outer harbor to depths of 25 feet in soft
material and 26 feet in hard material, and deepen the remainder of
the outer harbor to 20-foot depth.
      20196--37-pt. 1-86
 1360            REPORT OF 'CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The total cost of the existing project was $2,335,898.50, of which
$2,129,326.22 was for new work and $206,572.28 for maintenance.
The total expenditure was $2,335,121.66.
   Proposed operations.-The balance unexpended at the end of the
year, together with allotment of $641,100 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937                                                                                     $776. 84
New work: Deepening a part of outer harbor to 25 and 26 feet by
  continuing contract, August 1937 to July 193S'6-----------___                                                 10, 000. 00
Maintenance:
    Dredging by U. S. hopper dredges Taylor and Burton,
       October 1937 and April 1938__ __ --               $21, 596. 86
    Repairs to piers by U. S. derrick boat Niagara, Sep-
       tember 1937-----------------------------------      8, 000.00
    Sweeping by hired labor, May 1938-------- __       _   2, 000. 00
                                                                                                                31, 596. 86

           Total, new work and maintenance------------------------                                             642, 373. 70
  Funds are required to complete the new work, continuing contract
in force. Redredging and sweeping are required annually, and
repairs to breakwaters are necessary. For these items the additional
sum of $588,000 can be profitably expended during the fiscal year
1939 as follows:
New work: Completion of deepening part of the outer harbor to 25 and
  26 feet by continuing contract, July 1938-39-------------------     $543, 001)
lMaintenance:
    Dredging by U. S. hopper dredges Burton and Taylor,
       fall 1938 and spring 1939------------------------$28, 000
    Repairs to breakwaters by U. S. derrick boat Tonawanda
       summer 1938_-----------------------------------        15,000
    Sweeping by hired labor, spring 1939------------------     2, 000
                                                                   -    45, 000

           Total, new work and maintenance--                               -----------------------                588, 000

                                            Cost and financial summary

Cost of new work to June 30, 1937------------------------                                                $2,934, 597.94
Cost of maintenance to June 30, 1937-------------------------                                               246, 356. 25

     Total cost of permanent work to June 30, 1937----------                                              3, 180, 954.19
Minus accounts payable June 30, 1937 ------------------------                                                     776. 84

      Net total expenditures-----------------------------                                                 3, 180, 177. 35
Unexpended balance June 30, 1937  ------------------------                                                     1, 273. 70

           Total amount appropriated to June 30, 1937-----------                                          3, 181, 451.05

    Fiscal year ending June 30                    1933            1934            1935            1936             1937


Cost of new work..............              ...._----.         $345, 252. 06   $379, 366. 09   $324, 021. 60 __.------.
Cost of maintenance...           -.......        $27,348. 64      8, 346. 48     10, 823. 10     23, 990. 79     $15, 865. 64

       Total cost.         -----                27, 348. 64     353, 598. 54    390,189.19      348, 012. 39       15. 865. 64

Total expended ...............----              25, 704. 09     311,749. 90     323,587.07      449, 391. 54       24, 052. 88

Allotted     ----------------------             24, 891. 22     949, 500. 00     62, 900. 00     91, 500. 00        2, 000. 00

   1Inc!udes      $1,010,500 Publi            Works funds.
            RIVERS AND HARBORS--BUFFALO, N. Y., DISTRICT                                    1361
Balance unexpended July 1, 1936 ... -------------------                              $23, 326.58
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-----------       ------           --------                        2, 000.00

      Amount to be accounted for-......-----------------                               25,326.58
Gross amount expended -----------------------                                          24, 052.88

      Balance unexpended June 30, 1937__--------------                                  1, 273. 70
Outstanding liabilities June 30, 1937                                                   1, 273.70

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------                                                          41, 100. 00
                                                                                      6---------------------------
     Balance available for fiscal year 1938---__------------                          641, 100. 00

Amount (estimated) required to be appropriated for completion       - - -- - --
of existing project 2_________________              ___________                    1, 079, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:                          - -- - -- - -- - -- - -- -- - -- - -- - --
   For new work 2- - - - - - - - - - - -                                               543, 000. 00
   For maintenance 2______________________________________                              45, 000. 00

        Total 2                                                                       588, 000. 00
  2 Exclusive of available funds.

                                 10. ERIE HARBOR, PA.

   Location.-On the southerly side of the bay formed by Presque
Isle Peninsula, on the south shore of Lake Erie, 78 miles westerly
from Buffalo, N. Y. (See U. S. Lake Survey Charts Nos. 3 and 332.)
   Previous projects.-Adopted by River and Harbor Act of May 26,
1824, and modifications were subsequently made by approval of the
report of a board of engineers in 1855 and in 1865; by the River and
IHarbor Act of March 2, 1867; by approval of the report of a board
,of engineers in 1870; and by River and Harbor Acts of August 5,
1886, and September 19, 1890. The cost and expenditures were
:$841,867.43, of which $736,967.04 was for new work and $104,900.39
for maintenance since 1887. For further details see page 1965 of
Annual Report for 1915.
   Existing project.-This provides for an entrance channel 25 feet
-deep in soft material and 26 feet deep in hard material, 500 feet wide
lakeward of the entrance piers, and 300 feet wide between the piers
.and into the harbor on a straight alinement (eliminating angle in
previously authorized channel); for a channel of the same depths
.and 600 feet wide from the entrance channel to a line 50 feet outside
of the pierhead line at the ore terminal, suitably widened at the
junction with the entrance channel; for a harbor area 21 feet deep,
of approximately 117 acres, extending westerly from the 600-foot
.channel for a distance of about 2,100 feet to a line perpendicular to
the harbor line 200 feet west of the city dock, with its southerly side
50 feet from the harbor line; for a channel of the same depth and
.300 feet wide connecting the northern end of this harbor area with
.natural deep water in the bay; for an additional harbor area 18
feet deep, of about 35 acres, extending westerly from the 21-foot
.area and northerly from the harbor line off the public dock to natural
deep water in the bay; for a channel of approach to the westerly
.coal docks, 21 feet deep and 200 feet wide, extending from deep water
in the bay to a line 50 feet outside the harbor line; for an area 20
 -feet deep, of about 51/2 acres, extending from deep water in the bay
 1362     REPORT OF. CHIEF OF ENGINEERS, U. S. ARMY, 1937

   to the harbor line leading to the westerly ore and sand docks; for
   harbor entrance piers 360 to 450 feet apart, of the timber crib type,
   with concrete superstructure extending to the 16-foot contour in the
   lake, the north pier to have a length of about 3,248 feet and the south
   pier to have a length of about 2,215 feet, further extensions lakeward
   to be made when required to meet advance of said contour; for a
   timber crib breakwater 1,200 feet long (original length 2,530 feet)
   with stone superstructure, extending from the inner end of the south
   pier toward the mainland to maintain a closure at the eastern end
   of the harbor; and for plant growth and emergency protection work
   on the peninsula.
      The project depths are referred to low-water datum for Lake Erie,
   elevation 570.5 feet above mean tide at New York City.. Ordinary
  fluctuations of water level are from 3.5 feet above to 0.5 foot below
   low-water datum, and extreme fluctuations, produced by wind and
   other causes, are from 5.9 feet above to 2.7 feet below that plane.
      The estimate of cost for new work, revised in 1936 is $908,500,
  exclusive of amounts expended on previous projects. The latest
   (1935) approved estimate for annual cost of maintenance is $20,000.
      The existing project was authorized by the following river and
  harbor acts: The act of May 26, 1824, provided for the construction
  of the breakwater and piers and dredging of the entrance channel
  and for brushwood protection of the beach of Presque Isle Penin-
  sula (document or report not known) ; act of March 3, 1899, provided
  for the deepening of channel and harbor basin, for concrete super-
  structures and extensions of piers, and for plant growth and emer-
  gency protection work on the peninsula (H. Doc. No. 70, 55th Cong.,
  1st sess., and Annual Report for 1897, p. 3237), as modified by act of
  June 25, 1910 (Rivers and Harbors Committee Doc. No. 26, 61st
  Cong., 2d sess.); act of November 28, 1922 (Public, No. 366), re-
  conveyed Presque Isle Peninsula to the State of Pennsylvania for
park purposes; and the act of August 30, 1935, provided for straight-
ening, widening, and deepening the entrance channel; for a deepened
channel 600 feet wide approaching the ore dock at the easterly end
of the harbor, suitably widened at its junction with the entrance
channel; for a deepened harbor basin extending 200 feet westerly
from the city dock; for a channel 300 feet wide extending westerly
from the harbor basin to natural deep water in the bay; for an ap-
proach channel 200 feet wide at the coal docks at the westerly end of
the harbor; for eliminating the north breakwater from the project;
and for limiting the project length of the south breakwater to 1,200
feet (H. Doc. No. 52, 73d Cong., 1st sess.). The latest published
map is in the latter document.
     Local cooperation.-Deepeningthe entrance channel and the chan-
nel to the ore docks to more than 21 feet is subject to the condition
that assurances be received that local interests will do the work
necessary to provide for the full utilization at the ore dock of the
increased depth. Providing a channel to the westerly coal docks is
subject to condition that assurances be received that local interests
will do necessary work to provide for full utilization at these docks
to the depth afforded. None of these conditions has been complied
with.
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT             1363
   Terminal facilities.-The developed water front has a length of
about 2 miles, extending from the fdot of Parade Street at the east
end to foot of Cascade Street at the west end. Two groups of termi-
nals have been established along this harbor frontage and within the
United States harbor line, which is located about 1,800 feet beyond
the shore line. The westerly group of terminals consists of three
docks. One is equipped with a car dumper for coal but has not been
used for several years. The other docks have no equipment on them
and are used for storage of sand. The easterly group consists of
one ore dock, one coal dock, one dock of which one side is used for
package freight and the other for pulpwood, one grain elevator, two
sand docks, and one public dock used for unloading automobiles and
miscellaneous freight. There are two small boat basins in this area
that can accommodate boats with 6 feet draft. There are five fish
docks, two marine repair docks, one marine elevator, one marine rail-
way, and several docks for pleasure craft in these basins. The
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year-New work.-Contract
work for widening and straightening the entrance channels was com-
pleted at a cost of $101,478.76.
   Maintenance.-Government plant and hired labor removed 110,020
cubic yards of material from the entrance channels and basin at a
cost of $24,967.76.
   The total cost for the year was $126,446.52, of which $101,478.76
was for new work, and $24,967.76 for maintenance. The total expen-
diture was $125,805.88.
   Condition at end of fiscal year.-The existing project is about 38
percent completed. The Presque Isle Peninsula has been reconveyed
to the State of Pennsylvania for park purposes.,
   The dredging was completed in 1911 and the breakwaters and
piers in 1915. There is now a harbor basin with a depth of 18 to
20 feet, with an entrance channel at its easterly end 300 feet wide
and 20 feet deep at low-water datum, protected by the two piers and
the south breakwater. The widening and straightening of the en-
trance channel was completed in 1936. Rubble-mound shore protec-
tion works about 3',000 feet long and a steel-pile bulkhead faced with
stone have been constructed along a part of the neck of Presque Isle
Peninsula for the protection of the harbor. The bulkhead is 5,662 feet
long, including shore returns, with 5,052 feet stone-faced. The harbor
structures are generally in good condition. A section of the north pier
shows considerable settlement. The south breakwater is 2,530 feet
long. The north breakwater and the southerly 1,330 feet of the south
breakwater have been eliminated from the project.
   The work remaining to be done to complete the project is the
deepening of the outer entrance channel, the dredging of a deepened
channel of approach to the ore docks, the deepening of the harbor
basin, the dredging of a channel from the harbor basin to natural deep
water in the bay, and the dredging of an approach channel to the
westerly coal docks.
   There is a controlling depth of 20 feet at low-water datum in the
outer and inner channels and in the harbor basin leading to the docks
at the easterly end, 15 feet to coal docks at the westerly end, and 18
feet to the public docks, foot of State Street.
1364                REPORT OF CHIEF OF ENGINEERS, U.. S. ARMY, 193T

  The total cost of the existing project was $1,579,754.21, of which
$345,858.77 was for new work' and $1,233,895.44 for maintenance.
The total expenditure was $1,578,744.61.
  Proposed operations.--The balance unexpended at the end of the
year, together with allotment of $25,900 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937--------------                 ------ $1, 009. 60
Maintenance: Dreding by U. S. hopper dredge Savannah, May and
  June 1938--------      -----------------------------------        26, 760. 35
             Total -               -------------------------------------------                                              27, 769. 95
   Deepening the entrance channel and a portion of the harbor basin
is considered advisable. Redredging and sweeping are required an-
nually. For these items the additional sum of $404,500 can be profit-
ably expended during the fiscal year 1939, as follows:
New work: Deepening entrance channel and easterly 600 feet of
harbor basin to 25 and 26 feet by contract, July 1938-39-----       $375, 000
Maintenance:
   Dredging by U. S. hopper dredge Savannah, spring 1939_ $28, 000
   Sweeping by hired labor, summer 1938_ -----                1, 500
                                                                       29, 500

             Total, new work and maintenance-------------------------                                                         404, 500

                                                 Cost and financial summary
Cost of new work to June 30, 1937-------------------------                                                        $1, 082, 825. 81
Cost of maintenance to June 30, 1937-------------------                                                            1, 338, 795. 83
      Total cost of permanent work to June 30, 1937 ......-                                                         2, 421, 621.'64
Minus accounts payable June 30, 1937-----------------                                                                    1, 009. 60
     Net total expenditures-----------------------------                                                            2, 420, 612. 04
Unexpended balance June 30, 1937------------------------- ----                                                           1, 869.95
             Total amount appropriated to June 30, 1937                                                             2, 422, 481. 99

             Fiscal year ending June 30                          1933             1934           1935           1936             1937


Cost of new work _--------.--.--------                                                   -------------- ---------- $101,478.76
Cost of maintenance------------------__                      $18, 042.48     $6, 609.11       $29, 312. 84   $24, 526. 59      24, 967. 76

         Total cost------. ----..                 -....
                                                     ...... _ 18, 042. 48        6, 609. 11    29, 312. 84    24, 526. 59      126, 446. 52
Total expended_......-.-..-.--.---.-.-.                       29, 894. 18        6,504.98      27, 909.13     25, 717. 51      125, 805.88
Allotted .......................                   -__         9, 905. 43    32, 300.00        21,300. 00    160, 200. 00     -28, 000.00


Balance unexpended July 1, 1936__-------------------------------- $155, 675.83
Deductions on account of revocation of allotment___   ____----__--28, 000. 00

      Net amount to be accounted for ._________----------                                                               127, 675. 83
Gross amount expended_ _-----_----     ---------------                                                                  125, 805. 88

      Balance unexpended June 30, 1937-------------------               1, 869. 95
Outstanding liabilities June 30, 1937_-         ____---- ------------- 1, 869. 95
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------------         ------------------------    25, 900.00
Balance available for fiscal year 1938__-__- __-_-_-------------       25, 900. 00
Amount (estimated) required to be appropriated for completion of
                                                                    ~
                            - -- -- - -- - -- -- -- - -- -- - -- --
existing project 1 - , - -__                     _                  631,000.00
    1Exclusive of available funds.
               RIVERS AND HARBORS-BUFFALO,                                  N. Y., DISTRICT                 1365
Amount that can be profitably expended in fiscal year ending June 30,
1939:             - - -- -- -- -- ---- ------ ------ ------ ------ - - --
   For new work_                                                                                        $375,000.00
                         - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - -
   For maintenance - -                                         2                                          29, 500. 00
                             --- -- - -- -- -- -- - -- ------       - -- -- - -- -- -- --
         Total 1-__- -   -
                                                                                                     404, 500. 00
  1Exclusive of available funds.

                                    11. DUNKIRK HARBOR, N. Y.

   Location.-On the south shore of Lake Erie, 37 miles southwesterly
from Buffalo, N. Y. (See U. S. Lake Survey Charts Nos. 3 and 32.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 2, 1827, and was modified by the River and
Harbor Act of March 2, 1867, by approval November 30, 1870, of the
report of a board of engineers and by the River and Harbor Act of
June 3, 1896. The cost and expenditures prior to the adoption of the
existing project in 1910 were $987,770.25, of which $811,249.94 was for
new work and $176,520.31 for maintenance since 1887. For further
details of previous projects see page 1966 of Annual Report for 1915.
   Existing project.-This provides for an entrance channel 350 feet
wide at its lakeward end, narrowing to 200 feet at the entrance be-
tween the west pier and the breakwater, 270 feet apart, and widening
to 400 feet at the basin; for a harbor basin 2,420 feet long and 1,000'
feet wide, both channel and basin to be 16 feet deep; for a pier 1,410
feet in length on the west side of the entrance channel extending to
shore, 1,037' feet of timber cribs with concrete superstructure, 151/2 feet
with stone superstructure, and 3571/2 feet of the shore end not main-
tained; and for a detached breakwater extending eastward from the
entrance channel 2,814 feet in length, 987 feet of timber cribs with
concrete superstructure, and 1,827 feet with stone superstructure.
   The project depth is referred to low-water datum for Lake Erie,
elevation 570.5 feet above mean tide at New York City. Ordinary
fluctuations of water level are from 4 feet above to low-water datum,.
and extreme fluctuations produced by wind and other causes are from
6 feet above to 3 feet below that plane.
   The estimated cost for new work, revised in 1910, was $99,275,
exclusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1827, provided for beginning con-
struction of the pier, and the acts of 1828 to 1852 inferentially pro-
vided for continuing it to completion (documents or reports not
known, except S. Ex. Doc. No. 42, 35th Cong., 1st sess., and Annual
Report for 1866, pt. IV, p. 155); act of March 2, 1867, inferentially
provided for construction of the breakwater and excavating the en-
trance channel to 13 feet (report of Board of Engineers, approved
Nov. 30, 1870) ; act of June 3, 1896, provided for the entrance channel
and harbor basin of a depth suitable for vessels of 16 feet draft
(H. Doc. No. 63, 54th Cong., 2d sess.); and the act of June 25, 1910,
provided for the removal of the rock reef bordering the inner entrance
channel (H. Doc. No. 720, 61st Cong., 2d sess.). The latest published
maps are in Annual Report for 1903, page 2124, and House Document
No. 720, Sixty-first Congress, second session.
   Local cooperation.-Fully complied with.
1366              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.-There are three wharves in this harbor. Two
are too dilapidated for commercial purposes. The third, owned by
the city of Dunkirk, is designed for commercial use by large lake
vessels. The terminal has been leased to private parties but is open
to all on equal terms under the terms of the lease.
   The facilities are considered adequate for the small existing com-
merce or any probable increase.
   Operations and results during fiscal year.--Government plant and
hired labor removed 11,587 cubic yards of material for restoration
of project depth in the entrance channels at a cost of $7,227.37. The
total cost of maintenance for the fiscal year was $7,227.37 and the
total expenditure was $7,507.29.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1918 at a saving of $43,101 under the estimated cost. About
800 feet of the lake side of the west pier has been reinforced with
stone riprap. The harbor structures are in good condition.
   A depth of 16 feet below low-water datum is available in the en-
trdnce channel and 15 feet through the basin to the Central Avenue
wharf. Depths in the remainder of the basin vary from 4 to 12 feet,
   The total cost of the existing project was $464,515.39, of which
$56,174.10 was for new work and $408,341.29 for maintenance. The
total expenditure was $464,515.39.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1938.
   Redredging and sweeping are required annually. For these items
of maintenance, the additional sum of $17,000 can be profitably
expended during the fiscal year 1939 as follows:
Dredging by U. S. derrick boat Tonawanda, and U. S. hopper dredge
  Taylor, summer 1938------------------------------------         $16, 000
Sweeping by hired labor, summer 1938-----------------------------   1, 000
            Total------_                       ------------------------------------------                                                   17, 000

                                                       Cost and financial summary

Cost of new work to June 30, 1937-------------------------                                                                        $867, 424. 04
Cost of maintenance to June 30, 1937-------------------------                                                                      584, 861. 60
            Total cost of permanent work to June 30, 1937-----------1, 452, 285. 64

Net total expenditures--------- -------------------------- 1, 452, 285. 64
Unexpended balance June 30, 1937_----------------    -----------   305. 67
            Total amount appropriated to June 30, 1937 -------------                                                             1, 452, 591.31

            Fiscal year ending June 30                                 1933              1934             1935             1936              1937


Cost of new w ork--------------                         ...--------- -- - - --.. . . .    . .   . . .     . .    . . . .     .    . . .     ..   . .
Cost of maintenance-              -----------------------------
                                      -                                             $4, 464. 08    $35, 304. 09       $16, 200. 60          $7, 227. 37

Total expended. ------------------------------                                       4, 464. 08         32, 455. 51    18, 769. 26           7, 507. 29
Allotted...----------..........               ..-----------
                                       ------..... ..                                4, 464. 08         46, 178. 25    26, 859. 48        -14, 000. 00


Balance- unexpended-July 1, 1936_----------------------------   $21, 812. 96
Deductions on account of revocation of allotment-----------------4, 000. 00

            Net amount to be accounted for-...                                       _7,
                                                                                 _ __-----                       -                          812. 96
          RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                       1367
Gross amount expended             -____                                 $7, 507.29

      Balance unexpended June 30, 1937____-----------------------          305.67
Deductions on account of revocation of allotment -----------------         305. 67
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for maintenance_____________________                            17, 000. 00

                        12. BUFFALO HARBOR, N. Y.

   Location.-At the eastern end of Lake Erie, at the head of Niagara
River, 176 miles easterly from Cleveland, Ohio. (See U. S. Lake
Survey Charts Nos. 3 and 314.)
   Previous projects.-The original project was adopted by River and
Harbor Act of May 20, 1826, with modifications by River and Harbor
Acts of July 7, 1838, June 23, 1866, June 23, 1874, June 3, 1896, March
2, 1907, and June 25, 1910. The total cost and expenditures were
$6,161,232.33, of which $4,277,585.69 was for new work and $1,883,-
646.64 for maintenance since 1887. For further details see page 1967
of Annual Report for 1915.
   Existing project.-This provides for an outer harbor about 41/2
miles long and 1,600 feet wide, formed by a breakwater system ap-
proximately parallel to the lake shore, extending from Stony Point
to the head of Niagara River and-having a total length of 23,704- feet,
with entrances near the north and south ends, and consisting of the
Stony Point breakwater (including the south entrance arm) 3,603
feet long; the south breakwater 10,289 feet long; the old breakwater
7,608.5 feet long; the north breakwater 2,203.5 feet long; a south
entrance 550 feet wide; a centrally located circulation gap about
150 feet wide and natural depth of 20 feet; and a north entrance
1,300 feet wide. The types of construction are as follows; 9,550
linear feet of rubble mound; 14,154 linear feet of timber-crib sub-
structure surmounted with 9,113 linear feet of concrete, 370.5 linear
feet of stone, and 4,670.5 linear feet of stone-concrete superstructure.
The project also provides for a south pier at the entrance to the
inner harbor (Buffalo River), 1,760 feet long, of timber cribs and piles
with concrete and stone superstructure; for removal to a depth of
27 feet three small shoals located on the direct route of approach
to the south entrance; for a depth of 25 feet in the south entrance and
that portion of the outer harbor south of a line perpendicular to
and 2,000 feet north of the southerly end of the south breakwater;
for a depth of 23 feet in the outer harbor north of the above-defined
line, including the triangular area just inside the north enltrance;
for a depth of 23 feet and a width of 800 feet in the north entrance
from deep water in the lake to the triangular area described ibove;
for a depth of 21 feet in the triangular area at the junction with the
Black Rock entrance channel; for a depth of 21 feet in the Buffalo
River channel from the outer harbor to the foot of Commercial
Street, 180 to 250 feet wide, enlarged at the inner end by the removal
of the Watson elevator site; and for maintaining existing channels
in Buffalo River and Buffalo Ship Canal, generally 200 feet wide, to a
depth of 21 feet, except where ledge rock is encountered, from Commer-
cial Street to Seneca Street on Buffalo River and up to the junction
with the Lehigh Valley Railroad Canal on the Buffalo Ship Canal.
   The project depths are referred to low-water datum for Lake Erie,
elevation 570.5 feet above mean tide at New York City. Ordinary
1368           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

fluctuations of water surface are from 3.5 feet above to 0.5 foot below
low-water datum, and extreme fluctuations due to wind and other
causes about 9 feet above and 31/2 feet below that plane.
   The estimate of cost for new work, revised in 1935, is $2,758,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $140,000,
$40,000 of which was contributed by city of Buffalo.
   The existing project was authorized by the following river and
harbor acts:
         Act                                 Work authorized                           Documents or reports
                                                868
                                  Sout piein(exende
May 20,1826-_-.    - South pier (extended in 1868)---
                                                    .........--             _-- A. R. 1868, pp. 222 and 232.
June 23, 1874; June Sand-catch pier_ -.....-----               -                  A. R. 1876, pt. 2, p. 573, and 1895,
  3, 1896.                                                                          p. 3153.
                    Breakwater- ............... ....................
June 23, 1866-.......                                                             A. R. 1868, pp. 232-236, and 1876,
                                                                                    pt. 2, p. 569.
June 3, 1896- .....    Breakwater (modification) .......                          A. R. 1895, p. 3153.
Mar. 3, 1905 (Sun-     .....
                           _do -   ---....        .............. .. .. ...... .
                                                          ........                H. Doc. No. 240, 59th Cong.,
  dry Civil Act);                                                                   1st sess.
  Mar. 2, 1907.
Mar. 3, 1899; Mar.      Reconstruction of north breakwater ...-.......            H.   Doc. No. 72, 55th Cong.,
  3, 1909.                                                                          1st sess.
June 6, 1900; June      Deepening entrance channel to inner harbor and            (Specified in acts.)
  13, 1902.              removing rock shoal therein.
Mar. 2, 1907_.......Dredging at entrance to canals at South Buffalo
                     in outer harbor.
                ___ Extension of Federal project to Commercial
June 25, 1910 ....                                                                H. Doe. No. 298, and R. and H.
                     Street and removal of Watson elevator site.                    Com. Doc. No. 2, 61st Cong.,
                                                                                    2d sess.
July 25, 1912___....    For 21-foot depth over areas A, B, and D in outer         H. Doc. No. 550, 62d Cong.,
                         harbor and 23-foot depth over area C in main               2d sess.
                         outer entrance for a width of 800 feet.
Mar. 2, 1919 .__.       Deepening areas F and G, and deepening tri-               H.   Doe. No. 1139, 64th Cong.,
                         angular area at north entrance.                            1st sess., and H. Doc. No. 1004,
                                                                                    65th Cong., 2d sess.
              __
Jan. 21, 1927 ..... Removal of a shoal between entrance channel to                H. Doc. No. 481, 68th Cong.,
                      Buffalo River and Erie Basin.                                 2d sess.
                    Deepening areas H, I, and J in outer harbor......
July 3,1930........____                                                           R. and H. Com. Doc. No. 1, 71st
                                                                                    Cong., 1st sess.
Aug. 30, 1935- ...... Extending south entrance breakwater 1,000 feet.             H. Doe. No. 46, 73d Cong., 1st
                       Extending south breakwater 300 feet at middle                sess.
                       gap. For 23-foot depth in north portion of outer
                       harbor; 25-foot depth in south portion of outer
                       harbor. Elimination of sand-catch pier from
                         the project.
Aug. 30, 1935....... Maintaining the channels in Buffalo River and                R. and H. Com. Doc. No. 64,
                         Buffalo Ship Canal.                                        74th Cong., 1st sess.


   Prior to adoption by the act of August 30, 1935, the extension of
the south entrance breakwater and the south breakwater at the middle
gap had been authorized by the Public Works Administration, Sep-
tember 6, 1933. The latest published maps are in H. Doc. No. 46, 73d
Cong., 1st sess., and R. and H. Com. Doc. No. 54, 74th Cong., 1st sess.
  Local cooperation.-Deepeningthe south portion of the harbor and
the south entrance channel to 25 feet, and removal of shoals in lake
approach to depth of 27 feel are subject to the condition that local
interests afford satisfactory assurances that the improvement of the
ore and, limestone terminals at the southern end of the outer harbor
and the inner channels leading thereto, to fully utilize the increased
depth, afforded, will be undertaken to an extent sufficient to justify
the cost of the improvement by the Federal Government. These con-
ditions have not been complied with. All prior conditions have been
complied with.
   Terminal facilities.-Outer harbor : Consists of two canals or slips
at the southern end of the harbor which provide wharves for unload=
ing and shipping iron ore, coal, and limestone. One is that of the
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT             1369
Bethlehem Steel Co., Inc., Lackawanna plant; the other, the Union
Canal, occupied on one side by the Hanna Furnace Co. and the
Bethlehem Steel Co. and on the other side by the Pennsylvania Rail-
road Co. and the Great Lakes Portland Cement Co. There is one
shipbuilding wharf; one grain elevator, 2,000,000 bushels capacity;
one package-freight terminal; one Ford Motor Co.'s assembling and
reclaiming plant with slip 200 by 1,000 feet on south side of plant;
and two piers with slip between them owned by the city of Buffalo.
   Inner harbor: The Buffalo River, Buffalo Ship Canal, and connect-
ing basins and slips provide facilities for the following: Nineteen
grain elevators, storage capacity 42,057,000 bushels, with modern
applliances for unloading grain from vessels and transfer to cars and
canal barges; 3 coal docks for loading hard coal in vessels, 1 belt
conveyor, and 1 modern car dumper; 3 ore docks for unloading iron
ore from vessels-2 owned by industrial plants manufacturing steel
products and cast iron; the other is an ore-transfer dock, owned by a
railroad company. There are also 14 merchandise wharves, of which
12 are controlled by the trunk lines entering Buffalo; the other 2 are
owned by private parties; also 3 railroad-controlled flour docks. Six-
teen minor docks are used for unloading limestone, sand, gravel,
gypsum, and lumber. Passenger and merchandise lake transportation
companies control or own three docks and another is used by summer
excursion steamers. There are five public docks, three of which are
owned by the city of Buffalo and two by the State of New York. Of
the former, the dock at the foot of Main Street is the most important,
having a frontage of 200 feet. It is used principally by small dis-
patch boats and excursion steamers, under regulation and control of
the Buffalo city harbor master. The two State docks are part of the
New York Barge Canal system and comprise the Erie and Ohio
Basins.
   As a rule, the terminals owned or controlled by the railroad and
lake transportation companies and grain elevators are open to use on
equal terms by water carriers, while those owned by industrial cor-
porations or individuals are not.
   Out of a frontage of 17,100 feet of private property protected by
the outer breakwater, completed in 1903, about 5,300 feet is improved
with terminal facilities.
   The facilities are considered adequate for existing commerce. (See
Lake Series No. 1, 1931, Corps of Engineers.)
   Operations and results during fiscal year.--Government plant and
hired labor removed 176,869 cubic yards of material for restoration
of 21-foot depth in the outer harbor and the Buffalo River entrance
at a cost of $45,820.39. The restoration of Buffalo River and Buffalo
Ship canal to a depth of 21 feet by contract was completed in August
1936, 177,567 cubic yards of material were removed at a cost of $73,-
395.79 of which $40,000 was from contributed funds. The total cost
of maintenance for the fiscal year was $119,216.18 of which $40,000
was from contributed funds. The total expenditure was $147,366.67
of which $40,000 was from contributed funds.
   Condition at end of fiscal year.-The existing project is about 60
percent completed. The work_ done under the project is the con-
struction of the south pier; protecting the entrance to the inner har-
bor in Buffalo River; dredging and rock excavation to secure a
1370      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

channel 21 feet deep in Buffalo River, and the formation of an outer
harbor 13 to 25 feet deep at low-water datum.
   The Stony Point breakwater was completed in 1899, a 1,000-foot
extension was completed in 1914; 1,200 feet of the shore end was
sold to the Lackawanna Steel Co. in 1918 and another 1,000-foot
extension was completed in 1935. The south breakwater was com-
pleted in 1903, and a 300-foot extension was completed in 1935. The
north breakwater was completed in 1901, the old breakwater in 1893,
and the south pier in 1869.
   The project area in the outer harbor has been deepened to 21 feet
except for two strips 300 and 700 feet wide between the Canadian
Pool Terminal elevator and the Terminals and Transportation Cor-
poration's pier. The north-end entrance channel has been deepened
to 23 feet in the lake and 21 feet in the outer harbor and Buffalo
River.
   The harbor structures are in good condition except the concrete
banquette on a part of the south pier which requires repairs. The
controlling depth in the north and south entrance channels is 21 feet,
Buffalo River entrance channel is 20 feet, and the outer harbor ex-
clusive of the north and south entrance is 19 feet, at low-water datum.
   Deepening the outer harbor and removal of three small shoals
located on the direct route of approach to the south entrance remain
to be done to complete the project.
   The total cost of the existing project was $3,424,916.91 of which
$1,650,324.88 was for new work and $1,774,592.03 was for main-
tenance. The total expenditure was $3,424,916.91. In addition $40,-
000 was expended from contributed funds for maintenance.
   Proposed operations.-The balance unexpended at the end of the
year together with allotment of $766,800 made in July 1937, and
$50,000 contributed by the City of Buffalo, will be applied as follows:
New work: Deepening the northerly part of the outer harbor and
the north entrance by contract, season of 1938----------------_ $581, 000.00
Maintenance :
    Dredging Buffalo River and Buffalo Ship Canal
      by contract, July-September 1937------------- $100, 000. 00
    Dredging Buffalo River and Buffalo Ship Canal by
      contract, April-June 1938-------------------    40, 000. 00
    Dredging Buffalo River entrance and outer harbor
      by U. S. hopper dredges Burton and Taylor
      September and October 1937 and May and June
      1938----------------------------0               SO, 882. 39
    Sweeping by hired labor, July and August 1937
       and June 1938_____________________              _         5, 000. 00
    Removal of rock shoals in Buffalo River by U. S.
     derrick boat Niagara, December 1937 and March
       1938---------------------------------___                 10, 000.00
                                                                              235, 882. 39

        Total,   new work   and maintenance-----------------_            -816.    882. 39
   It is considered desirable to complete the project. Redredging and
sweeping are required annually, repairs to structures and probing the
area outside of the north entrance is necessary. For these items the
additional sum of $650,000 can be profitably expended during the
fiscal year 1939 as follows:
                     RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                              1371
New work: Deepening the southerly :portion of the outer harbor and
  the south entrance by contract, July 1938-39------------------- $500, 000
Maintenance :
    Dredging Buffalo River and Buffalo Ship Canal by con-
      tract, spring 1939--------------------------------- $40, 000
    Dredging Buffalo River entrance and outer harbor by
      U. S. hopper dredges Burton and Savannah, summer
      1938 and spring 1939---------                 ------ ------------ 70, 000
    Repairs to breakwaters by U. S. derrick boat Niagara,
      spring 1939-----------------------------------                    30, 000
    Sweeping by hired labor, summer 1938 and spring 1939__               5, 000
    Probing area outside of north entrance by hired labor,
      summer 1938-------------------------------                   ----  5, 000
                                                                                150, 000

                 Total, new work and maintenance                                          _                               650,000

                                                      Cost and financial summary
                                                          UNITED STATES FUNDS


Cost of new work to June 30, 1937-- ---------------------                                                    1   $5, 927, 910. 57
Cost of maintenance to June 30, 1937- .. _,    -
                                              ______----                                                          3, 658, 238. 67
             Total cost of permanent work to June 30, 1937----------                                              9, 586, 149. 24

Net total expenditures-__-------------------- ---        -                                                   19,     586, 149. 24
Unexpended balance June 30, 1937 ...------------------------                                                               82. 39
             Total amount appropriated to June 30, 1937___--_______                                              19, 586, 231. 63

      Fiscal year ending June 30                          1933          1934              1935             1936              1937


Cost of new work-------------------------$171, 570. 44                                  $426, 363. 05   $57, 566. 51     _-..-....
Cost of maintenance----------..........--. $97, 457. 83 278, 183. 63                      64, 068. 06    35, 180. 14       $79, 216. 18
        Total cost_--.
                     __-___-----                        97, 457. 83   449, 754. 07       490, 431. 11    92, 746. 65        79, 216. 18
Total expended-----------------....................     62, 724. 81   436, 646. 14     -694, 965. 83     165, 319. 61     107, 366. 67
All1otted ..........................                   228, 980. 29   950,833.16     -1,174, 335. 99    -28,300. 00         31, 000. 00

Balance unexpended July 1, 1936       ____                                                                           $76, 449. 06
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 ____________ _ $52,000. 00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936___---___         10, 000. 00
                                                                                                                        62, 000. 00
Amount to be accounted for____-     ______                                                                           138, 449. 06
Deductions on account of revocation of allotment_                                                                     31, 000. 00
      Net amount to be accounted for___                                                                             107, 449. 06
Gross amount expended          _____                                                                                107, 366. 67
Balance unexpended June 30, 1937----      --       -                                      __    __                           82. 39
Outstanding liabilities June 30, 1937-_________---                                       -- ______                           82. 39
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_---_-_________-                                                                                    50, 000. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937____ _____________                                                                           716, 800. 00
            Balance available for fiscal year 1938--                                 ___-________-_                 766, 800. 00

   1Includes $655,500 Public Works funds.
1372               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount (estimated) required to be appropriated for completion
of existing project     -----------------                                                                                           $500, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939: 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For new work                                                                                                                      500, 000. 00
   For maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                         150, 000. 00
                            -- --        --    - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
             Total                                                                                                                    650, 000.00
     2 Exclusive of available funds.

                                                            CONTRIBUTED FUNDS

Cost of new work to June 30, 1937------------------------
Cost of maintenance to June 30, 1937--------------------------                                                                        $40, 000. 00
      Total cost of permanent work to June 30, 1937                                                       ----------                     40, 000. 00
Net total expenditures----- --------------------------------                                                                             40, 000. 00
Total amount contributed to June 30, 1937---------------------                                                                           40, 000. 00

             Fiscal year ending June 30                                1933               1934               1935             1936           1937


'Cost of new work----............................----
Cost of maintenance-----------------.......................--------..........-----.....---------.......-----.....----    ------------        $40, 000
Total expended..-------.......------------.............--------- ------------------------------------                                            40, 000
Contributed-----------......               ....-------------- -------------------------------                                 $40, 000


Balance unexpended July 1, 1936--- -----------------------                                                                              $40, 000. 00
Gross amount expended_ _------------------                                                                                               40, 000. 00

Amount contributed by the city of Buffalo July 1, 1937----- ---                                                                          50, 000. 00
Balance available for fiscal year 1938 -------------------------                                                                         50, 000. 00

         CONSOLIDATED COST AND FINANCIAL SUMMARY                                                 FOR BUFFALO             HARBOR,         N. Y.

Cost of new work to June 30, 1937----------------------                                                                       1 $5, 927,910. 57
Cost of maintenance to June 30, 1937-----------------------                                                                      3, 698, 238. 67

             Total cost of permanent work to June 30, 1937-----------                                                             9, 626, 149. 24

Net total expenditures---------------------------------                                                                        19, 626, 149.24
Unexpended balance June 30, 1937---------------------------                                                                              82.39

             Total amount appropriated and contributed to June 30,
               1937 ---------------------          --------                                                                     19, 626, 231. 63

        Fiscal year ending June 30                            1933                1934                    1935                1936           1937


Cost of new work ...--------------------------                                $171, 570. 44           $426, 363. 05      $57, 566. 51
Cost of maintenance..-------------- $97,457. 83                                278, 183. 63             64, 068. 06       35, 180. 14     $119, 216.18
         Total cost-        -----..........--....          97, 457. 83         449, 754. 07             490, 431. 11      92, 746. 65      119, 216. 18
Total expended...................------------------        62, 724. 81         436, 646. 14          -694, 965. 83       165, 319. 61      147, 366. 67

Allotted and contributed.- _ _ .....                     228, 980. 29          950, 33. 16         -1, 174, 335. 99       11, 700. 00       31, 000. 00


Balance unexpended July 1, 1936                               ____- $116, 449. 06
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934__    __      __ $52, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved May 15, 1936__ ______________  10, 000. 00
                                                                      62, 000. 00

             Amount to be accounted for_ _______ _______                                                                  _          178, 449. 06
    1 Includes $655,500 Public Works funds.
               RIVERS AND HARBORS-BUFFALO,                                N. Y., DISTRICT              1373
Deductions on account of revocation of allotment                                                   31, 000. 00
                                                                                                  $--------------

      Net amount to be accounted for_ --------------------                                        147, 449. 06
Gross amount expended -------__-__-__-___-----147,                                                     366. 67

      Balance unexpended June 30, 1937 ---     __-----------82.39
Outstanding liabilities June 30, 1937_ -------------------------                                        82. 39

Amount contributed by the city of Buffalo July 1, 1937--------  50, 000. 00
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936 ----       _____---______-----------50,000.00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937    -----------------------------       716, 800. 00

         Balance available for fiscal year 1938-                           ------                 816, 800. 00

Amount (estimated) required to be appropriated for -completion
                         - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - -
of existing project 2                                                                            500, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:        -- - - -- - -- - -- - -- - -- - -- - -- - -- -- - -- -- - -- -
   For new work 2- - - -                                      - - - - - - - - - - - - - -
                                                                                                  500, 000. 00
   For maintenance .   2                                                                  --      150, 000. 00

        Total -------------------------------------------                                         650, 000. 00
   2 Exclusive of available funds.

      13. BLACK ROCK CHANNEL AND TONAWANDA HARBOR, N. Y.

  Location.-This improvement is essentially that of the upper 131/2
miles of the Niagara River from its head at Lake Erie, Buffalo,
N. Y., to and including Tonawanda Harbor, N. Y. It comprises the
improvements formerly designated by three titles, viz, Lake Erie
entrance to Black Rock Harbor and Erie Basin, N. Y., Black Rock
Harbor and Channel, N. Y., and Tonawanda Harbor and Niagara
River, N. Y. (See U. S. Lake Survey Chart No. 312.)
  Previous projects.-Lake Erie section, none. The original project
for Black Rock Harbor and Channel was adopted by the River and
Harbor Act of March 2, 1829. The original project for Tonawanda
Harbor and Niagara River was adopted by the River and Harbor
Act of March 3, 1881. The cost and expenditures on these projects
were $58,027.28, all for new work. For further details see items 5
and 7, page 1970, of Annual Report for 1915.
  Existing project.-This provides for a channel 21 feet deep from
Buffalo Harbor, north entrance channel, to opposite Sixth Avenue,
North Tonawanda, total length 13 /2 miles, as follows: 400 feet wide
to Erie Basin, Buffalo, a distance of 2,300 feet, suitably widened at
the bend; thence 500 feet wide to the foot of Maryland Street,
Buffalo, a distance of 2,190 feet; thence 350 feet wide, narrowing to
200 feet wide, 500 feet northwest; thence generally 200 feet wide
through Black Rock Channel to the ship lock at the foot of Bridge
Street, a distance of 3.3 miles, widened to 240 feet at the curve
opposite the foot of Porter Avenue and to 300 feet at the angle imme-
diately south of the International Bridge. From the lock the chan-
nel is 400 feet wide in the Niagara River to the natural deep-water
pool at the upstream end of Rattlesnake Island, a distance of 3.4
miles; thence through natural deep water to the downstream end of
the deep-water pool at the Tonawanda waterworks intake crib, a
distance of about 4.7 miles, widened to 500 feet opposite the Wick-
wire Spencer Steel Co's plant by the removal of 200 feet of the
1374       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

westerly end of Rattlesnake Island Shoal; thence 400 feet wide to
the foot of Tonawanda Island opposite Second Avenue, North Tona-
wanda, a distance of 5,000 feet, ending in a turning basin about
1,230 feet long and 1,250 feet wide extending to a point opposite
Sixth Avenue.
   The project also provides for the removal of rock shoals from the
Lake Erie entrance to the canal and in the canal south of Ferry
Street Bridge, to a depth of 22 feet-; for a channel 16 feet deep, 6,800
feet long, and generally 400 feet wide in Tonawanda Inner Harbor;
for a channel 16 feet deep, 1,400 feet long, and generally 180 feet wide
in Tonawanda Creek; for a ship lock at Bridge Street, Buffalo; for
a bridge over the canal at Ferry Street, Buffalo; for the repair and
800-foot extension of Bird Island pier; for the improvement and
extension of the guide pier; and for the repair of the towpath wall.
   The project depth in the canal is referred to low-water datum in
Lake Erie, elevation 570.5 feet above mean tide at New York City.
The project depth in the river is referred to the river surface when
Lake Erie is at low-water datum. Ordinary fluctuations of water
level above the lock are from 3.5 feet above to 0.5 foot below low-
water datum, and extreme fluctuations produced by winds and other
causes are about 9 feet above to 31/2 feet below that plane. River
fluctuations gradually decrease to about 70 percent of fluctuations
above the lock when they reach North Tonawanda.
   The estimate of cost for new work, revised in 1935, is $8,141,500,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $83,000,
including $58,000 for operating and care.
                               Description of Black Rock lock

Location: Foot of Bridge Street, Buffalo, N. Y. (in city limits).
Dimensions:
   Length between miter sills-----------        ----------- feet-_             650
   Available length for full width -------------------      do-....            625
   Width in clear (between fenders) -------- _-----_do ___                      68
   Depth on miter sills at low water------------------__do ----                 21. 6
    Lift --  ----------------------------------             do -                 5.0

Foundation (lock) : Bedrock.
Dam: Fixed.
Type of construction:
    Lock, concrete walls; steel mitering gates.
    Dam: The dam consists of Squaw Island dike and Bird
      Island pier lying between the canal and Niagara River.
      The pier was built of timber cribs filled with stone in
      1822-34, chiefly by State of New York. Cost is unknown.
Cost of lock-_---     ------------------------------------    $1, 037, 213. 20
Approach walls and office storehouse--------------------------    526, 842. 53

       Total -------------------------------------------              1, 564, 055. 73
  The existing project was authorized by the following river and
harbor acts: rThe act of August 11, 1888, provided for a channel in
Niagara River from Lake Erie to Tonawanda Harbor (H. Doc.
No. 83, 50th Cong., 1st sess.) ; act of June 3, 1896, provided for deepen-
ing the channel in Tonawanda inner harbor to 16 feet (Annual Re-
port for 1897, pp. 3116-3120); act of June 13, 1902, provided for
deepening Tonawanda Creek to 16 feet (H. Doc. No. 143, 56th Cong.,
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                1375
1st sess.); act of July 27, 1916, provided for the turning basin and
for a depth of 21 feet in the channel along Tonawanda Island (H.
Doc. No. 658, 63d Cong., 2d sess.) ; act of June 13, 1902, provided for
the channel from Buffalo outer harbor to the foot of Maryland
Street (H. Doc. No. 125, 56th Cong., 2d sess.), modified by the act
of August 8, 1917, for widening it at the bend; act of March 3, 1905,
provided for the channel from the foot of Maryland Street to the
natural deep-water pool upstream from Tonawanda Harbor and for
ship lock, bridge, and repair of pier and wall (H. Doc. No. 428, 58th
Cong., 2d sess.), modified by the act of September 22, 1922, for widen-
ing channel at the foot of Maryland Street (H. Doc. No. 981, 66th
Cong., 3d sess.), modified by the act of March 3, 1925, for widening
Black Rock Canal immediately south of the International Bridge
and for the removal of the westerly end of Rattlesnake Island Shoal
 (H. Doc. No. 289, 68th Cong., 1st sess.) ; and modified May 28, 1935,
under the provisions of the Emergency Relief Appropriation Act of
1935 and by the act of August 30, 1935, for the removal of rock shoals
from the Lake Erie entrance to the canal and in the canal south of
Ferry Street Bridge, the enlargement of the North Tonawanda turn-
ing basin, the extension of the Bird Island pier, the improvement of
the guide pier, and made the downstream side of the Main-Webster
Street Bridge the upper limit of the Tonawanda Creek Channel (H.
Doc. No. 28, 73d Cong., 1st sess.). Operation and care of the canal,
lock, and bridge were included in the project July 1, 1935, under the
provisions of the Permanent Appropriations Repeal Act approved
June 26, 1934. The latest published map is in the last-mentioned
document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are no terminals along the canalized
channel above the Black Rock lock. Transfer of freight takes place
across the towpath to commercial plants on the east side.
    The city of Buffalo uses frontage at the old Massachusetts Street
waterworks pumping station and owns frontage at the Porter Ave-
nue waterworks pumping station (part leased to the Buffalo Yacht
Club) .and used only for small-boat landings. It also owns a pier at
the foot of Georgia Street.
    Under permit of the Secretary of War, dated June 23, 1913, the
northerly 2,950 feet of Bird Island pier and adjacent area was turned
over to the city of Buffalo for occupation and use as a public park
and landing facilities, that part of the pier to be maintained by the
city. Under this permit the city has constructed a retaining wall on
the Niagara River side of the area and a retaining wall, and a 90(-foot
small-boat landing dock on the channel side, at a total cost of $693,625,
of which $64,700 was appropriated by the Civil Works Administration
in 1934.
    Under permit of the Secretary of War, dated August 14, 1936, the
above lands plus an additional 160 feet extending northerly thereof
were turned over to the city of Buffalo for occupation and use either
by the city of Buffalo or by the Buffalo Sewer Authority for sewage
disposal facilities.
    Along the easterly bank of the Niagara River, below the Black
Rock lock, the terminals consist of the American Radiator Co., ma-
chine-tool department, three sand and gravel yards; one passenger
      20196-37-pt. 1---87
1376     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

dock at the foot of Amherst Street; a coal dock; an oil dock; a blast
furnace dock on Rattlesnake Island; and an oil dock, all used exclu-
sively by the owners thereof.
   At Tonawanda and North Tonawanda the terminal facilities con-
sist of wharves along the river frontage extending one-fourth mile
above and 2 miles below the Tonawanda Creek; also all of the 13/4
miles of water front of Tonawanda Island, of the main shore of
North Tonawanda, and the water front to Tonawanda Creek from
its mouth to the Webster-Main Street Highway Bridge, a distance
of 1,400 feet.
   There are 10 lumber docks, 2 sand and gravel docks,, 1 ore dock,
1 pulpwood dock, 1 fueling dock, 1 passenger dock, landing for ex-
cursion boats, a small boat-repair yard, and; the Paper Board Cor-
poration's dock. The ore dock, sand and gravel, and fueling docks
are equipped with unloading machinery, but the other docks have no
such appliances.
   All wharves have railroad connections, are owned by the com-
panies using them, and are open to all water carriers which are suit-
able and chartered for the traffic.:
   There are also two State docks which are part of the New York
Barge Canal system, one in North Tonawanda, the other in Tona-
wanda, on opposite sides of Tonawanda Creek. These terminal facili-
ties are considered adequate for existing commerce. (See Lake Series
No. 1, 1931, Corps of Engineers.)
   Operations and results during fiscal year-Regular funds---Main-
tenance.-Government plant and hired labor removed 57,367 cubic
yards of material from the Black Rock Channel and Tonawanda
Harbor at a cost of $31,467.07 for, maintenance.
   Operating and care.-The lock was in continuous operation 296
days and in operation during the day only, for 60 days. The lock
was closed March 13, 1937, to March 21, 1937, for underwater clean-
ing and repairs. The Ferry Street Bridge was in continuous opera-
tion 296 days and in operation during the day only, for 69 days. The
signal station at the foot of Genesee Street, Buffalo, N. Y., was main-
tained except from December 24, 1936, to April 4,. 1937. The total
cost for the fiscal year was. $65,449.06. The expenditure for main-
tenance and operating and care was $103,129.08.
   Emergency Relief funds-New work.-Contractor's operations
were in progress removing rock shoals from the Lake Erie entrance
to the canal and in the canal south of Ferry Street, enlarging the
Tonawanda turning basin and extending the Bird Island pier. The
contract work is about 99 percent completed. The cost during the
fiscal year was $1,409,377.70 and the expenditure was $1,441,521.04.
   Total costs for the year, all United States funds, were $1,409,377.70
for new work, $31,467.07 for maintenance, and $65,449.06 for operat-
ing and care, a total of $1,506,293.83. The total expenditure was
$1,544,650.12.
   Condition at end of fiscal year.-The existing project is about 96
percent completed. The channel from Buffalo Harbor north en-
trance channel to opposite Sixth Avenue, North Tonawanda, is com-
pleted except completion of removal of rock shoals from the Lake
Erie entrance to the canal and in the canal south of Ferry Street
bridge, which was in progress at the end of the year. The different
         RIVERS AND HARBORS-BUFFALO,          N. Y., DISTRICT     1377
sections of this channel were completed to the project depths required
at the time the work was done as follows: Lake Erie section in 1909,
widened at the bend opposite foot of Georgia Street, Buffalo, in 1924;
Black Rock Canal section in 1915, widened just south of the Inter-
national Bridge at Buffalo in 1928; Niagara River section from lock
to deep-water pool above Tonawanda in 1913 and the removal of 200
feet of the westerly end of the Rattlesnake Island Shoal in 1928; and
widening the channel opposite the foot of Maryland Street, Buffalo,
in 1930.
   The Tonawanda Creek Channel was completed in 1902. Tona-
wanda Inner Harbor Channel was completed in 1904. The enlarge-
ment of the Tonawanda turning basin and the extension of Bird Is-
land pier were completed in 1936. The lock, including wing walls
and retaining walls above the lock, was completed in 1914, and the
100-foot east wing wall extension in 1927. The guide pier connecting
with the west lower wing wall was completed in 1916, except 200-foot
northerly extension and construction of concrete platform in the angle.
The bridge at Ferry Street was completed in 1914, the Ferry Street
storehouse in 1923, the lock-operating houses and office storehouse in
1924, the storage warehouse in 1930, and the oil storehouse in 1931.
   The plane of low-water datum has been lowered 0.77 foot since the
work south of Ferry Street, Buffalo, was done, and lowered 0.42 foot
since the remainder of the work was done. This lowering resulted
in a considerable number of shoals, which are now being removed to
provide the full project depth in the channel.
   The work remaining to be done to complete the project consists of
the completion of removal of the rock shoals from the Lake Erie
entrance to the canal and in the canal south of Ferry Street bridge,
and the improvement of the guide pier, as authorized under the
Emergency Relief Appropriation Act of 1935 and the River and
Harbor Act of August 30, 1935.
   Structures are all in good condition except the towpath wall and
low part of Bird Island pier, which require frequent repairs.
   The controlling depths at low-water datum are Black Rock Chan-
nel, 17.5 feet; Tonawanda Inner harbor, 15 feet; and Tonawanda
Creek Channel, 12 feet.
   The total cost of the existing project from regular funds was
$8,118,221.48, of which $6,156,468.60 was for new work, $487,671 for
maintenance, and $1,474,081.88 for operating and care. The total
expenditure was $8,115,094.99. The total cost of the existing proj-
ect from Emergency Relief funds was $1,690,071.21 for new work,
and the expenditure was $1,615,353.55.
   The total cost of the existing project, all United States funds, was
$9,808,292.69, of which $7,846,539.81 was for new work, $487,671 for
maintenance, and $1,474,081.88 for operating and care. The total
expenditure was $9,730,448.54.
   The above includes the sum of $1,356,006.68 which was expended
between July 9, 1914, and June 30, 1935, in the operation and care of
the works of improvement under the provision of the permanent in-
definite appropriation for such purposes.
   Proposed operations.-The balance unexpended at the end of the
year, together with allotment of $368,100 made in July 1937 will be
applied as follows:
1378              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Regular funds: Accounts payable June 30, 1937______________ _              $3, 126.                                                  49
New work: Construction of extension of guide pier and platform
in angle by contract, October 1937-38--------------------------          225, 000.                                                  00
Maintenance:
    Dredging Black Rock Canal by U. S. hopper dredge
      Taylor and derrick boat Erie, July and August
      1937---_______----------------------------------- $58, 476. 02
    Dredging Tonawanda Harbor by U. S. derrick boat
      TOnawanda, September 1937-------------------- 13, 500. 00
    Sweeping by hired labor, April 1938-                   , 500. 00
                                                          1--------------
                                                                           73, 476.                                                  02
Maintenance (operating and care) :
    Operation of lock, bridge, and signal station------ 45, 000. 00
    Ordinary repairs---_ ----------------------------- 13, 000. 00
    Improvement and reconstruction------------------     12, 000. 00
                                                                           70, 000.                                                  00
      Total, new work and maintenance------------------             _     371, 602.                                                  51
   The balance of $144,646.45 unexpended from allotment by the
Federal Emergency Relief Administration will be applied to com-
pletion of removal of shoals from Lake Erie entrance to the Black
Rock Canal and in the canal south of Ferry Street Bridge.
   Redredging and sweeping are required annually and repairs to
structures are necessary. For these items of maintenance the addi-
tional sum of $99,000 can be profitably expended during the fiscal
year 1939 as follows:
Maintenance:
   Dredging by U. S. hopper dredge Taylor, summer 1938___ $21,000
   Dredging Tonawanda Harbor by U. S. derrick boat Tona-
      wanda, summer 1938---------------------------------- 13, 500
    Repairs to Bird Island pier by Government plant and hired
            labor, fall 1938-_____________________________________                                                5, 000
        Sweeping by hired labor, summer 1938 --------------------                                                 1, 500
                                                                                                                           $41, 000
Maintenance (operating and care) :
   Operation of lock, bridge, and signal station---------------42, 000
   Ordinary repairs ----       ------------------------- 13, 000
   Improvement and reconstruction -------------------            3,000
                                                                                                                             58, 000
           Total------------------------------------                                                                         99, 000
                                                 Cost and financial summary
                                      MAINTENANCE                AND     IMPROVEMENT        FUNDS

'Cost of new work to June 30, 1937----------------------------                                                    $6, 214, 495. 88
Cost of niaintenance to June 30, 1937-----                                   ------------                          1, 961, 752. 88
     Total cost of permanent work to June 30, 1937------------                                                     8, 176, 248. 76
Minus accounts payable June 30, 1937--------------------------                                                          3, 126. 49
     Net total expenditures---------------------------------                                                       8, 173, 122. 27
Unexpended balance June 30, 1937-----------------------------                                                           3, 502. 51
      Total amount appropriated to June 30, 1937--------------                                                     8, 176, 624. 78

            Fiscal year ending June 30                            1933           1934          1935           1936            1937


Cost of new work. ..                ..-- .              ------
                                                     .------        .------------...    .. ----.-----..
                                                                                            .. . .. .      . ..    ...     . ..   ..      .
Cost of maintenance---...........--------------              $63, 655. 62    $95, 874. 88   $61, 927. 15   $59, 651. 49    $95, 916. 13

        Total cost ........--...------------                  63, 655. 62     95, 874. 88    61, 927. 15   59, 651. 49       96, 916. 13
Total expended ..-------------....................--------    61, 899. 30     93, 772. 53 -42, 3]11.87      58, 165. 21    103 129.08
Allotted.--------------------                 ----------.     57, 055.06     118, 293.42    -5,160.38       71, 378. 62      19,000.00

    1Includes $1,356,006.68 permanent indefinite appropriations funds.
                    RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                                                  1379
Balance unexpended July 1, 1936-                                                                                                          $87, 631. 59
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936----------------------------------------                                                                              19, 000. 00

      Amount to be accounted for ------------------------------                                                                           106, 631. 59
Gross amount expended---------------------------------------                                                                              103, 129. 08

      Balance unexpended June 30, 1937--                                                                                                    3, 502. 51
                                         ---
Outstanding liabilities June 30, 1937----_______                                                         ---------                          3, 502. 51

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------368,100.                                                                                   00
Balance available for fiscal year 1938________________________                                                                            368, 100. 00
Amount that can be profitably expended in fiscal year ending
    June 30, 1939, for maintenance                                       2-     _______       ____9,                                            000. 00
    2 Exclusive of available funds.

                                                        EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937---------------------------                                                                          $1,690,071. 21
Cost of maintenance to June 30, 1937-----------     _____-_

      Total cost of permanent work to June 30, 1937-----------1,                                                                          690, 071. 21
Minus accounts payable June 30, 1937__ __-____________-___                                                                                 74, 717. 66

     Net total expenditures--------------------- ------------                                                                          1, 615, 353. 55
Unexpended balance June 30, 1937-----------------------------                                                                             144, 646. 45

            Total amount appropriated to June 30, 1937--------------                                                                   1.760. 000. 00

       Fiscal year ending June 30                           1933                       1934              1935                  1936            1937


Cost of new work_               -     .          _    ----....
                                                          ..-......-................                                .   $280, 693. 51      $1, 409, 377. 70
Cost of maintenance..----...-------------------------------
Total expended--------........             ........             ..................            .............                173, 832. 51     1, 441, 521. 04
Allotted.....
         ------------                 -----------------                       -------------          $1, 760, 000       ........


Balance unexpended July 1, 1936_----------------------                                                                                $1, 586, 167. 49
Gross amount expended- --------------------------------------                                                                            , 441, 521. 04
     Balance unexpended June 30, 1937------------------------                                                                             144, 646. 45
Amount covered by uncompleted contracts___________________                                                                                144, 646. 45

          CONSOLIDATED COST AND FINANCIAL SUMMARY BLACK ROCK CHANNEL AND
                               TONAWANDA HARBOR, N. Y.

Cost of new work to June 30, 1937________________-------------$7, 904, 567. 09
Cost of maintenance to June 30, 1937__-------- ______________  1, 961, 752. 88
      Total cost:of permanent work to June 30, 1937------------                                                                        9, 866, 319. 97
Minus accounts payable June 30, 1937_-------   ________________                                                                            77, 844. 15
     Net total expenditures--------------------------------                                                                            9, 788, 475. 82
Unexpended balance June 30, 1937_______-----------_______________                                                                         148, 148. 96
            Total amount appropriated to June 30, 1937-_-------------9,                                                                   936, 624. 78
   1   Includes $1,356,006.68                 permanent indefinite appropriations funds.
1380                 REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


     Fiscal year ending June 30                              1933           1934              1935            1936              1937


Cost of new work................-------------..................................-------...-----.....        $280, 693. 51    $1, 409, 377. 70
Cost of maintenance--------.............   $63, 655. 62           $95, 874. 88          $61, 927. 15         59, 651. 49         96, 916. 13

          Total cost................---------------         63, 655. 62    95, 874. 88      61, 927 15      340, 345. 00     1, 506, 293. 83

Total expended....--....----...--.......                    61, 899.30     93, 772. 53    -42, 311.87       231, 997.72      1, 544, 650. 12

Allotted----------------------.........................     57, 055. 06   118, 293. 42   1, 754, 839. 62     71, 378. 62        19, 000. 00


Balance unexpended July 1, 1936- -          -----------   $1,673,799. 08
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936       ____----------------              19, 000.00

      Amount to be accounted for_ -------------------------                                                              1, 692, 799. 08
Gross amount expended      ---------------------------------                                                             1, 544, 650. 12

      Balance unexpended June 30, 1937 __---.    -______-----                                                              148,148. 96
Outstanding liabilities June 30, 1937-   ____----$3, 502.51
Amount covered by uncompleted contracts--------- 144, 646. 45
                                                                                                                           148,148. 96

Amount allotted from War Department Appropriation Act ap-
  proved July 19, 1937------------------------------------   368, 100. 00
Balance available for fiscal year 1938__ -----       __-----368,100. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 2- - - - - - - __________
                                                  -    - -
                                                           __                                                        -
                                                                                                                            99, 000.00
    2Exclusive of available funds.

                                                          14. NIAGARA RIVER, N. Y.

   Location.--This improvement covers that portion of the Niagara
River from Tonawanda Harbor, N. Y., to Niagara Falls, N. Y., a
distance of 71/2 miles. The downstream limit of the improvement
is about 16 miles from the mouth of the river at Lake Ontario. (See
U. S. Lake Survey Chart No. 312.)
   Previous projects.--Adopted by River and Harbor Acts of July
13, 1892, August 18, 1894, and June 25, 1910. The cost and expendi-
tures were $68,507.24, all for new work. For further details see
page 1970 of Annual Report for 1915.
   Existing project.-This provides for a channel 12 feet deep and
300 feet wide in the east channel from the downstream end of the
existing 21-foot channel opposite Sixth Avenue, North Tonawanda,
to the upstream end of the 12.7-foot channel near the Niagara Falls
waterworks intake crib; and for a channel 12.7 feet deep and from
300 to 400 feet wide from the Navy Island Channel (natural) to the
foot of Hyde Park Boulevard (formerly called Sugar Street),
Niagara Falls, N. Y.
   The project also provides for the construction of compensating
works just above the contracted section of the river at Fort Erie,
this work forming a part of the project for deeper channels in the
connecting waters of the Great Lakes.
   The project depths are referred to the river surface when Lake
Erie is at low-water datum, elevation 570.5 feet above mean tide
at New York City. Ordinary fluctuations of water level are from
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT            1381
2 feet above to 0.5 foot below low-water datum, and extreme fluctua-
tions, produced by wind and other causes, are from 51/2 feet above to
1 feet below that plane.
   The estimate of cost for new work, revised in 1930, is $1,616,600,
including $27,562.50 contributed by local interests, and $700,000 for
compensating works, but exclusive of amounts expended on previous
projects. The latest (1930) approved estimate of cost of annual
maintenance is $9,000, of which $5,000 is for maintenance of the
compensating works.
   The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for the channel 12.7
feet deep from the Navy Island Channel and widening and deepen-
ing to 12.7 feet of the Niagara Falls waterworks channel from the
intake crib to the foot of Hyde Park Boulevard (formerly called
Sugar Street) (H. Doc. No. 549, 62d Cong., 2d sess.) ; and the act of
July 3, 1930, provided for the 12-foot channel from North Tona-
wanda to the Niagara Falls waterworks intake crib (H. Doc. No.
289, 71st Cong., 2d sess.) and for the compensating works (H. Doc.
No. 253, 70th Cong., 1st sess.). The latest published maps are in the
Annual Report for 1915, page 3306, and in the two last-mentioned
documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Those between North Tonawanda and Niag-
ara Falls are confined to two docks-one at the foot of Hyde Park
Boulevard (formerly called Sugar Street), 660 feet long, owned by
the Niagara Falls Power Co. and occupied under lease by the Empire
Builders Supply Co. and reserved for their private uses, and the
other at the foot of Iroquois Street 204 feet long, owned by the Niag-
ara Falls Power Co., open to all water carriers on equal terms of
rental.
   These facilities are considered adequate for the small amount of
existing commerce. Additional terminal facilities have been assured
as required under modification of project adopted by the River and
Harbor Act of July 3, 1930.
   Operations and results during fiscal year.-Government plant and
hired labor swept and removed obstructions in the channels at a
cost of $4,923.92 for maintenance. The total expenditure was
$4,887.80.
   Condition at end of fiscal year.-The existing project is about 30
percent completed. The east channel from North Tonawanda to
the Niagara Falls waterworks intake and Schlosser's Channel from
Niagara Falls waterworks intake to the foot of Hyde Park Boule-
vard were completed in 1934. The work remaining to be done is the
construction of the compensating works just above the contracted
section of the river at Fort Erie. The controlling depth in the
channels is 11.5 feet at low-water datum.
   The total cost of the existing project was $498,618.94, of which
$463,386.62 was for new work and $35,232.32 for maintenance. The
total expenditure was $498,372.87. In addition $27,562.50 was ex-
pended from contributed funds for new work.
1382        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-The balance unexpended at the end of the
year together with allotment of $3,000 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937------------------------------------ $246. 07
Maintenance:
    Removing boulders from the channel by U. S. derrick
      boat Niagara, May 1938---------------------------$2, 172. 36
    Sweeping by hired labor, May 1938-------------------  1,000.00
                                                                   3, 172. 36
      Tctal---------------------------------------------------3, 418. 43
  Removing boulders and shoals from the channel and sweeping are
required annually. For these items of maintenance, the additional
sum of $4,800 can be profitably expended during the fiscal year
1939 as follows:
Removing boulders and shoals from the channel by U. S. derrick boat
Niagara, spring 1939-$3,                                                                                        000
Sweeping by hired labor, spring 1939-------------------------------                                           1, 800
        Total-------------                                 -----------------------------                      4,800
                                         Cost and financial summary
Cost of new work to June 30, 1937------------------------                                         1$531,893.86
Cost of maintenance to June 30, 1937---------------------------                                          35, 232. 32
     Total cost of permanent work to June 30, 1937---------                                             567, 126. 18
Minus accounts payable June 30, 1937--------------------------                                              246. 07

     Net total expenditures ----------------------------------                                          566, 880. 11
Unexpended balance June 30, 1937----------------------------                                                 418. 43
        Total amount appropriated to June 30, 1937--------------                                        567, 298. 54

        Fiscal year ending June 30                  1933         1934          1935            1936          1937


Cost ofnew work.___-....._-..-- ___ __ _ $2, 406. 14 $361, 450. 15          $49, 076. 32    $21, 398. 75 -...-......
Cost of maintenance-...._.--------------------                  -            - 1, 635. 91      9, 967. 81  $4,923.92

                                        2, 406, 14
     Total cost-..........................                    361, 450.15    50, 712. 23    31, 366.56       4. 923. 92

Total expended             ---                      636. 87 332, 087. 16
                                       __............................        81, 033.42     31,967. 68       4,"887.80

                                     388, 000.00
Allotted.......-............-....---.......                    67,000. 00     6, 000.00       -968.64       -9, 000. 00


Balance unexpended July 1,1936___                                   $14, 306. 23
Amount allotted from War Department Appropriation Act approved
  May 15, 1936------------------------------------------ -----        1,000. 0
      Amount to be accounted for------------------------------       15, 306. 23
Deductions on account of revocation of allotment __--------------10, 000. 00
      Net amount to be accounted for__----------------------------_   5, 306. 23
Gross amount expended-----------------------------------------        4, 887. 80
      Balance unexpended June 30, 1937                                    18.43
                                                                         4------------------------
Outstanding liabilities June 30, 1937-----------------418.                     43
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937---------------------------------------                                           3, 000. 00
Balance available for fiscal. year 1938_--                                                                3, 000.00
Amount (estimated) required to be appropriated for completion of
   existing      project 2------------------                                                            700, 000. 00

Amount that can be profitably expended in fiscal year eiiding June
                                 -- ----------    --------- -----
  30, 1939, for maintenance 2                                               4, 00. 00
  1Includes $94,512.24 Public Works funds, but exclusive of $27,562.50 expended from
contributed funds.
  2Exclusive of available funds.
         RIVERS AND HARBORS-BUFFALO,         N. Y., DISTRICT     1383
                      15. OLCOTT HARBOR, N. Y.

   Location.-This harbor consists of a pier-protected channel way,
1,500 feet long and 98 to 180 feet wide, in the mouth of Eighteen
Mile Creek, on Lake Ontario, 18 miles east of the mouth of Niagara
River and 63 miles by water west of Rochester (Charlotte) Harbor,
N. Y. (See U. S. Lake Survey Chart No. 2.)
   Previous project.-The original project was adopted by the river
and harbor act of March 2, 1867, and was modified by approval of
the Chief of Engineers June 18, 1891. The cost and expenditures
under this project prior to the adoption of the existing project in
1.913 were $179,169.05, of which $140,209.86 was for new work and
$38,959.19 for maintenance since 1887. For further details see page
1971 of Annual Report for 1915.
   Existing project.-This provides for a channel 12 feet deep and
140 feet wide from the lake to the inner ends of parallel timber crib
piers about 200 feet apart, the west pier to be 873 feet long and the
east pier 850 feet long.
   The project depth is referred to low-water datum for Lake Ontario,
elevation 244.0 feet above mean tide at New York City. Ordinary
fluctuations of water surface are from 4 feet above to low-water
datum, and fluctuations, due to wind, are small.
   The estimate of cost for new work, made in 1912, was $3,000, exclu-
sive of amounts expended on previous projects, only one-half of
which is to be borne by the United States. The latest (1928) ap-
proved estimate for annual cost of maintenance is $2,500.
   The existing project was authorized by the following River and
Harbor Acts: The act of March 2, 1867, provided for a channel 11
feet deep between parallel piers (Annual Report for 1866, pt. III,
p. 15, and pt. IV, p. 1.58) ; and the act of March 4, 1913 (H. Doc. No.
780, 62d Cong., 2d sess.) provided for a channel 12 feet deep and
5-year maintenance of the west pier. This document contains the
latest published map.
   Local cooperation.-Fully complied with.
   Local interests have expended about $10,000 since August 1925
replacing old timber superstructure on cast pier with concrete and
dredging in the channel. The sum of $5,000 was contributed in 1928
by local interests toward the cost of replacing old timber super-
structure on west pier with concrete.
   Terminal facilities.-None, except that the United States east pier
is used during the summer season for landing of small pleasure craft.
Prior to 1915 passenger boats and others carrying small amounts of
merchandise landed at the east pier. All commerce stopped during
the war. Under revocable permit, dated December 8, 1922, part of
the United States east pier, near its inner end, is occupied and used
as a landing place for pleasure-boating parties.
   The facilities are considered adequate for any prospective com-
merce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1918 at a saving of $1,500 under the estimated cost. The
project channel was completed in 1913; the piers were completed in
1384                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

1873. The wooden superstructure has been replaced with concrete
on 614.6 feet of the west pier and 705 feet of the east pier completed
in 1930. The portions of the piers having concrete superstructure are
in good condition. The remainder of the piers are at the inner ends
shoreward of the shore line and are regarded as not required for
harbor protection.
   The channel was redredged to a depth of 10 feet at low-water
datum in 1931. The present controlling depth is 7.5 feet at low-
water datum.
   The total cost and expenditure to the United States of the existing
project to the end of the fiscal year was $65,255.95, all for mainte-
nance. In addition, $5,000 was expended from contributed funds
for repair of the west pier.
   Proposed operations.-The allotment of $6,000 made in July 1937.
will be applied to maintenance dredging by the U. S. derrick boat
Tonawanda during September 1937.
   No work is proposed and no funds can be profitably expended dur-
ing the fiscal year 1939.
                                            Cost and financial summary

Cost of new work to June 30, 1937------------------------------ $140, 209. 86
Cost of maintenance to June 30, 1937---------------------------1104, 215. 14

      Total cost of permanent work to June 30, 1937-------------- 244, 425.00
Net total expenditures ----------------------------------------   244, 425. 00
Total amount appropriated to June 30, 1937------_______________1 244, 425. 00

            Fiscal year ending June 30                              1933               1934           1935                 1936             1937

Cost of new work                             ......                                                     ...... ............
Cost of maintenance .......................--------------------------------------                   $1, 849. 12....................
Total expended..............-----.........                                ----------                 1,849.12------------------------
Allotted----------------..---..........   ---------------   .................                 ...    1, 849. 12 .......................


Amount allotted from War Department Civil Appropriation                                                                  Act
  approved July 19, 1937__------------------------------------_                                                                           6, 000. 00
Balance available for fiscal year 1938--------------------------___                                                                       6, 000. 00
    1 In addition, $5,000 was expended from contributed funds.

                             16. ROCHESTER (CHARLOTTE)                                          HARBOR, N. Y.

  Location.-On the south shore of Lake Ontario, at the mouth of
the Genesee River, 59 miles westerly from Oswego, N. Y. (See
U. S. Lake Survey Charts Nos. 2 and 241.)
  Previous projects.-Adopted by River and Harbor Acts of March
2, 1829, August 2, 1882, and by authority of the Chief of Engineers
on July 18, 1896, and March 2, 1897. The cost and expenditures
were $865,322.95, of which $247,793.88 was for new work and $617,-
529.07 for maintenance since 1840. (For further details see p. 1971
of Annual Report for 1915.)
   Existing project.-This provides for a channel from deep water
in the lake to New York Central Railroad bridge near the mouth of
the river, on an alinement centrally located with respect to the en-
trance piers, and with a width of 300 feet lakeward of the pierheads
and 200 feet shoreward of the pierheads, and a depth of 20 feet, and
         RIVERS AND HARBORS-BUFFALO,          N. Y., DISTRICT     1385
for a turning basin of the same depth, 600 feet in width, opposite
the municipal terminal; and for parallel piers of the timber-crib
type with concrete superstructure, about 450 feet apart, from the lake
to the pool at the mouth of the Genesee River, the west pier to be
3,036 feet long and the east pier 2,699 feet long.
   The project depth is referred to low-water datum for Lake On-
tario, elevation 244.0 feet above mean tide at New York City. Ordi-
nary fluctuations of water surface are from 4 feet above to 0.5 foot
below low-water datum, and fluctuations due to winds are small.
   The estimate of cost for new work, revised in 1935, was $89,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $21,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1829, provided, inferentially for
construction of the piers and a channel 12 feet deep (Annual Report
for 1874, p. 247), modified by the act of June 25, 1910, for the chan-
nel 20 feet deep (H. Doc. No. 342, 61st Cong., 2d sess.); concrete
superstructure on piers authorized under maintenance by the Chief of
Engineers in 1905 (Annual Report for 1905, p. 2393); and the act
of August 30, 1935, provided for the channel centrally located be-
tween entrance piers, the turning basin, and for the present length
of the piers. Prior to adoption of the last modification by the River
and Harbor Act of 1935, those modifications had been authorized
May 28, 1935, by the Emergency Relief Appropriation Act of 1935
 (H. Doc. No. 484, 72d Cong., 2d sess.). The latest published map
is in the last-mentioned document.
   Terminal facilities.-Those on the west side of the Genesee River
are one trestle, for the shipment of soft coal, located about 3 miles
inside the harbor entrance; one car-ferry slip immediately below the
coal trestle for the transfer of railroad cars to ferryboats; one wharf
adjoining the car-ferry slip for unloading feldspar from vessel to
car; a railway passenger and freight wharf, about 1,000 feet long,
located 1 mile inside the harbor entrance; one municipal passenger
and freight terminal, 1,200 feet long, on the west side of the river
between Beach Avenue and the New York Central Railroad bridge,
completed in 1932.
   On the east side of the river, opposite the New York Central Rail-
road wharf, there is a sand wharf.
   These facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-Government plant and
hired labor removed 155,756 cubic yards of material for restoration
of 20-foot depth in the entrance channel and turning basin at a cost
of $25,189.10. There was a cost of $175 for reimbursing liquidated
damages on the contract for repairs to about 345 linear feet at the
inner end of the west pier. The total cost of maintenance for the
fiscal year was $25,364.10, and the total expenditure was $24,961.58.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935 at a saving of $10,386 under the estimated cost. A
length of 345 linear feet of the west pier has been reinforced and
repaired with steel sheet piling and concrete. A portion of the re-
mainder of the west pier needs reinforcement and repairs. The pres-
ent channel was completed in 1935. The channel is unstable and
requires annual dredging to maintain project depth. The control-
ling depth in the channel is 20 feet at low-water datum.
1386               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The total cost of the existing project was $474,947.01, of which
$78,614.10 was for new work and $396,332.91 for maintenance. The
total expenditure was $473,897.34.
  Proposed operations.-The balance unexpended at the end of the
year, together with allotment of $21,000 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937----------------------------------- $1, 049. 67
Maintenance:
    Repairs to the east pier by Government plant and
      hired labor, September 1937----------------------$6, 000. 00
    Dredging by U. S. hopper dredge Taylor, April and
      May 1938--_---------------------------
                               _                    ---  14, 000. 00
    Sweeping by hired labor, May 1938____-_____________   1, 000. 00
                                                                     21, 000. 00
              Total---------------------------------                                                                                22, 049. 67
  Redredging and sweeping are required annually. For these items of
maintenance, the additional sum of $20,000 can be profitably expended
during the fiscal year 1939 as follows:
Dredging by U. S. hopper dredge Taylor and derrick boat Niagara,
spring 1939---------------------------------------------------- $i9, 000
Sweeping by hired labor, spring 1939 ------------- __------------   1, 000
               Total_-------------                                               ----------------------------                            20, 000
                                                       Cost and financial summary
Cost of new work to June 30, 1937__ __________________________-   $326, 407. 98
Cost of maintenance to June 30, 1937                   ____--   1,
                                                                1------------
                                                                   013, 861. 98                      ____
     Total cost of permanent work to June 30, 1937------------1, 340, 269.96
Minus accounts payable June 30, 1937--------------------------       1, 049. 67
      Net total expenditures______________                     1, 339, 220. 29
Unexpended balance June 30, 1937                                     1, 049. 67
      Total amount appropriated to June 30, 1937               1 , 340. 269. 96                  --------------
             Fiscal year ending June 30                                   1933           1934               1935        1936              1937


Cost of new work---------------------.........................---.....------------.......------------                $56, 806. 00 ...------
Cost of maintenance..------------------....................            $10, 348. 12   $42, 685. 18     $6, 140. 17    17, 298. 62      $25, 364. 10
         Total cost----------------------...........................    10, 348. 12    42, 685. 18      6, 140. 17    74, 104. 62       25, 364. 10
Total expended----------------------............................        10, 170. 32    23, 686. 30     25, 286. 90    73, 457. 47       24, 961. 58
Allotted---------------...................                              11, 198. 50    46, 677. 76     76, 700. 00    12, 706. 00        8, 000. 00


Balance unexpended July 1, 1936 _____________________                                                                           $18, 011.25
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936_          __________                                                                                           8, 000. 00
      Amount to be accounted for_________------                                                                                     26, 011. 25
Gross amount expended----------------------------------------                                                                       24, 961.58
      Balance unexpended June 30, 1937___________--------                                                                            1, 049. 67
Outstanding liabilities June 30, 1937---------------------                                                                           1, 049. 67
Amount allotted from War Deparament Civil Appropriation Act
  approved July 19, 1937                                                                                                             1, 000. 00
                                                                                                                                    2-------------------------------
Balance available for fiscal year 1938__._____.________-----___                                                                     21, 000. 00
Amount that can be profitably expended in fiscal year ending June
                                    -   - - - - - - - -    -                                                                        20, 000. 0
30, 1939, for maintenance 2 - - - -                          ___                                                                                 0
  1Includes $56,806 emergency relief funds.
  2 Exclusive of available funds.
         RIVERS AND    HARBORS-BUFFALO,       N. Y., DISTRICT     1387
                17. GREAT SODUS BAY HARBOR, N. Y.

   Location.-On Sodus Bay, which is a nearly land-locked indenta-
tion of the south shore of Lake Ontario, 29 miles westerly from
Oswego, N. Y. (See U. S. Lake Survey Charts Nos. 2 and 234.)
   Previous projects.-Adopted by River and Harbor Acts of March
2, 1829, and June 23, 1866. The cost and expenditures were $361,-
771.80, all for new work. For further details, see page 1972 of
Annual Report for 1915.
   Existing project.-This provides for an entrance channel parallel
to the entrance piers extending from deep water in the lake to deep
water in the bay, 22 feet deep and 300 feet wide to just lakeward of
the pierheads, thence narrowing to 200-foot width with 20-foot depth
between the piers, widening to 300-foot width with 20-foot depth to
deep water in Great Sodus Bay; for parallel piers 450 feet apart,
of timber cribs with concrete superstructure, the west pier 1,580 feet
long and the east pier 1,294 feet long; for an east breakwater 1,653
feet long, of timber cribs with concrete superstructure, extending
from the inner end of the east pier to Charles Point; and for a west
breakwater 2,200 feet long, of stone-filled timber cribs, extending
from the inner end of the west pier to Sodus Point, not maintained.
   The project depth is referred to low-water datum for Lake On-
tario, elevation 244.0 feet above mean tide at New York City. Ordi-
nary fluctuations of water surface are from 4 feet above to 0.5 foot
below low-water datum, and fluctuations due to wind are small.
   The estimated cost for new work, revised in 1935, is $244,000, exclu-
sive of amounts expended on previous projects. The latest (1935)
approved estimate for annual cost of maintenance is $14,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1829, provided inferentially for
the piers and breakwaters (Annual Report for 1876, pt. II, p. 589),
modified in 1833 to provide for a channel 150 feet wide and 15 feet
deep (Annual Report for 1874, p. 253), modified in 1882 for extend-
ing the piers to the 15-foot contour in the lake (Annual Report for
1881, p. 2442), concrete superstructure on piers and breakwater
authorized under maintenance by the Chief of Engineers, March 25,
1907 (Annual Report for 1908, p. 2194); act of March 3, 1925, pro-
vided for a depth of 18 feet (H. Doc. No. 192, 68th Cong., 1st sess.);
act of July 3, 1930, provided for widening the channel in Lake On-
tario to 250 feet (Rivers and Harbors Committee Doc. No. 17, 70th
Cong., 1st sess.) ; and act of August 30, 1935, provided for a channel
parallel to the piers 300 feet wide and 22 feet deep in the open lake,
200 feet wide and 20 feet deep between the piers, and 300 feet wide
and 20 feet deep to deep water in Great Sodus Bay (Rivers and
Harbors Committee Doc. No. 23, 72d Cong., 1st sess.). The latest
published maps are in House Document No. 192, Sixty-eighth Con-
gress, first session, and Rivers and Harbors Committee Document
No. 23, Seventy-second Congress, first session.
   Local cooperation.-Deepening and widening the channel as pro-
vided by the River and Harbor Act of August 30, 1935, is subject to
the condition that local interests give assurances satisfactory to the
Secretary of War that a channel will be provided and maintained to
the coal-loading terminal in the bay, of width, depth, and with
maneuverineg facilities sufficient for full utilization of the Federal
1388      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

improvement. These conditions have not been complied with. All
prior conditions have been complied with.
   Terminal     facilities.-The Pennsylvania Railroad Co. (Northern
Central division) owns and operates a trestle for the shipment of
hard or soft coal, located on the west side of Great Sodus Bay, 13/4
miles inside the harbor entrance. The railroad company also owns a
wharf about 200 feet long, located about five-eighths mile north-
easterly from the coal trestle, which is in a very dilapidated and
unusable condition. The terminal is open to use by all chartered
water carriers on equal terms. There are no public docks.
   These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Government plant and
hired labor removed 15,836 cubic yards of material from the entrance
channel at a cost of $8,686.34 for maintenance.       The total expendi-
ture was $11,704.30.
   Condition at end of fiscal year.-The existing project is about 39
percent completed. The east breakwater, 1,653 feet, and the west
breakwater, 2,200 feet long, were completed about 1834; the west pier
in 1884; the east pier in 1886; and dredging the channel on the old
location to 18 feet in 1931. The piers are in good condition. The
west breakwater is not maintained.
   The controlling depth in the entrance channel at the close of the
fiscal year was 18 feet at low-water datum. The channel is unstable
and requires annual redredging to maintain the project depth. The
work remaining to be done to complete the project is deepening the
entrance channel located parallel to the entrance piers.
   The total cost of the existing project was $579,927.95, of which $96,-
253.66 was for new work and $483,674.29 for maintenance. The total
expenditure was $579,522.49.
   Proposed operations.-The balance unexpended at the end of the
year, together with allotment of $10,000 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937------- ---   --------------------                  $405. 46
Maintenace :
    Dredging by U. S. hopper  dredge Taylor  and U. S. derrick boat
      Niagara, May and June 1938------------------              $10, 376. 70
    Sweeping by hired labor, June 1938-----_--        -----       i,
                                                                  1 000. 00
                                                                                11, 376. 70
       Total----------------------------------------------                      11, 782. 16
  Redredging and sweeping are required annually. For these items
of maintenance, the additional sum of $9,500 can be profitably ex-
pended during the fiscal year 1939 as follows:
Dredging by U. S. hopper dredge Taylor and U. S. derrick boat Niagara,
spring 1939-----------------------------------                        $8, 500
Sweeping by hired labor, spring 1939-------------------________                     1. 000
      Total----------------------------------------------                           9, 500
                         Cost and financial summary
Cost of new work to June 30, 1937----------_--________-               $458, 025. 46
Cost of maintenance to June 30, 1937-----------                             674.29
                                                               -________-483,
      Total cost of permanent work to June 30, 1937 -------------      941, 699. 75
Minus accounts payable June 30, 1937 ----------------                               405.46
     Net total expenditures----...           -------,__-                       941, 294. 29
Uiexpended balance June 30, 1937 ----------------                                1. 782 16
     Total amount appropriated to June 30, 1937--                              943, 076. 45
                  RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                          1389

           Fiscal year ending June 30                     1933           1934            1935         1936             1937


Cost of new work-....-------------------------------
Cost of maintenance---------------------__              $2, 745. 15   $14, 804. 57   $10, 453. 45   $7, 335. 27      $8, 686. 34

Total expended-------.___.-.. ...            ----- _.    4, 822. 46    14, 730. 57     7, 861. 68    6, 526. 44      11, 704. 30

Allotted_--------...........----.-- --                  13, 491. 65     8, 400. 00    11, 400. 00   10, 000. 00


Balance unexpended July 1, 1936----------------------------                                                   $13, 486. 46
Gross amount expended--     ----------------------------------                                                 11, 704.30

      Balance unexpended June 30, 1937--1------------,                                                                 82.16
                                                                                                                      7------
Outstanding liabilities June 30, 1937                                                                               , 782. 16
                                                                                                                   1------------------------

Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937----------------------------                                                              10,000.00
Balance available for fiscal year 1938--------------------------                                                  10, 000. 00
Amount (estimated) required to be appropriated for completion of
exciting project    -----------------------------                                                           147, 500.00
Amount that can be profitably 1-expended                in fiscal year ending
                                           - - --- - -- - -- -- - - - --- ----- ---
June 30, 1939, for maintenance                                                                                    9, 500. 00
    1 Exclusive of available funds.

                                18. LITTLE SODUS BAY HARBOR, N. Y.

   1location.-On Little Sodus Bay, which is an indentation of the
south shore of Lake Ontario, 15 miles westerly from Oswego, N. Y.
 (See U. S. Lake Survey Charts Nos. 2 and 227.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, June 23, 1866, and March 3, 1871. The cost and expendi-
tures were $232,327.75, all for new work. For further details see
page 1973 of Annual Report for 1915.
   Existing project.-This provides for an entrance channel 151/2 feet
deep and 150 feet wide from the lake to the bay between parallel
piers of the timber-crib type with concrete superstructure, about 250
feet apart, the west pier to be 1,747 feet long and the east pier 1,810
feet long, connected at its inner end with a timber-crib concrete
breakwater 1,680 feet long.
   The project depth is referred to low-water datum for Lake
Ontario, elevation 244.0 feet above mean tide at New York City.
Ordinary fluctuations of water surface are from 4 feet above to 0.5
foot below low-water datum, and fluctuations due to wind are small.
   The estimate of cost for new work, made in 1882, was $80,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance was $8,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 30, 1852, provided for the piers (An-
nual Report for 1874, p. 256), modified in 1871 to provide for the
east pier 250 feet from the west pier and the connecting east break-
water (Annual Report for 1871, p. 234). The act of March 3, 1881,
provided for the extension of the piers to the 1511-foot contour in
the lake and for a channel 15     feet deep (Annual Report for 1881,
p. 2444); and the act of June 13, 1902, provided for the extension of
the east pier 300 feet lakeward (Annual Report for 1901, p. 3364).
The latest published map is in the Annual Report for 1881, page 2446.
   Terminal facilities.--The Lehigh Valley Railroad Co. owns and
operates a trestle for the shipment of hard coal located on the east
1390     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

side of Little Sodus Bay three-fourths of a mile inside the harbor
entrance. The terminal is open to use by the chartered water carriers
on equal terms. There are no public docks. These facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-Government plant and
hired labor removed 17,930 cubic yards of material from the entrance
channel at a cost of $7,641.48 for maintenance. The expenditure was
$6,846.79.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1906 at a saving of $10,934 under the estimated cost. The
structures are all of the timber-crib type, the piers and 1,600 feet of
the east breakwater having concrete superstructure. The west and
east piers were completed in 1886 and 1906, respectively, and the
dredging in 1896. The piers and the part of the east breakwater
having concrete superstructure, are in good condition. The lake face
of one crib and both lake and channel faces in a second crib in west
pier, each 30 feet long, have been breached and repaired with stone
and concrete-block riprap. The lakeward 500 linear feet of the west
pier was riprapped in 1930 to reinforce the pier and prevent further
breaching. The timber superstructure of the remaining 80 linear feet
at the east end of the east breakwater is decayed, but rebuilding is
not considered necessary. The west breakwater is buried in sand
and not maintained.
   The controlling depth is 15.5 feet at low-water datum. The channel
is unstable and requires redredging annually.
   The total cost of the existing project was $521,144.05, of which
$69,066.20 was for new work and $452,077.85 for maintenance. The
total expenditure was $519,998.34.
   Proposed operations.-The balance unexpended at the end of the
year, together with a net allotment of $3,100 made in July 1937, will
be applied as follows:
Accounts payable June 30, 1937----------------------- ------------- $1, 145. 71
Maintenance :
   Dredging by U. S. hopper dredge Taylor, June 1938___ $5, 690. 93
   Sweeping by hired labor, June 1938__ __________  ___ 1, 000. 00
                                                                        6, 690. 93
       Total ----------------------------------------------------      7, 836. 64
  Redredging and sweeping are required annually. For these items
of maintenance the additional sum of $14,000 can be profitably ex-
pended during the fiscal year 1939 as follows:
Dredging by U. S. hopper dredge Taylor and U. S. derrick boat Niagara,
  spring 1939---------------------                          __-------  $7,000
Removal of boulders by Government plant and hired labor, fall 1938____  6, 000
Sweeping by hired labor, summer 1938---_ -----------------------------_ 1, 000
       Tbtal--------------------------------------
                 __                                                       14,000
                          Cost and financial summary
Cost of new work to June 30, 1937__ --_    __       _--------       $301,393. 95
Cost of maintenance to June 30, 1937____________________________      452, 077. 85
      Total cost of permanent work to June 30, 1937---                753, 471. 80
Minus accounts payable June 30, 1937---
                                    .-     ------                       1, 145. 71
       Net total expenditures_    -   -   ------
                                          _-----_                     752,326.09
                 RIVERS AND HARBORS-BUFFALO,                                                   N. Y., DISTRICT                            1391
Unexpended balance June 30, 1937 -----                                                                                               $4, 736. 64
           Total amount appropriated to June 30, 1937______--_---_                                                               757, 062. 73

           Fiscal year ending June 30                             1933            1934                1935               1936             1937


Cost of new work                                                                    -         ---          -      -- -          --         --
Cost of maintenance-_---------------_                          $2, 662. 83      $4, 094. 52         $9, 659. 22     $1, 538.71          $7, 641. 48
Total expended..              ....------------------------      5, 232. 91      3, 317. 21           8, 369. 90      3, 347. 58           6, 846. 79
Allotted    ......       ..      ...                              4,900. 00
                                          ......-----------------------------    2, 700. 00         10,900.00       10, 300. 00         -- 1, 000. 00


Balance unexpended July 1, 1936-------------------------------                                                                   $12, 583.43
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_ _------------------------------------------                                                                     4, 000. 00
     Amount to be accounted for                                                                                      ___             1____________________
                                                                                                                                     16, 583. 43
Deductions on account of revocation of allotment -----------------                                                                    5, 000. 00

      Net amount to be accounted for________                                             ____-________                               11, 583. 43
Gross amount expended--_-------                                                                                                       6,846. 79

      Balance unexpended June 30, 1937------------ ------------                                                                       4, 736. 64
Outstanding liabilities June 30, 1937-----------------------------                                                                    1, 236. 64
      Balance available June 30, 1937-----------------------                                                                          3, 500. 00
Deduction on account of revocation of allotment ________________                                                                      3, 500. 00
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937          __      _______------------------------------------------6,     600. 00
Balance available for fiscal year 1938                                                          600.00
                                                                                             6----------------------------
Amount that can be profitably- - expended     in fiscal year ending June
                                  -- --- -- --- --- --- -- --- --- --- -- --- --
30, 1939, for maintenance                                                                  14, 000. 00
   1 Exclusive of available funds.

                                           19. OSWEGO HARBOR, N. Y.

   Location.-On the south shore of Lake Ontario, at the mouth of
the Oswego River, 59 miles easterly from Rochester, N. Y. (See
U. S. Lake Survey Charts Nos. 2 and 225.)
   Previous projects. Adopted by River and Harbor Acts of March
2, 1827, March 2, 1831, June 23, 1866, July 25, 1868, July 11, 1870,
March 3, 1881, September 19, 1890, the Sundry Civil Act of March
3, 1893, and River and Harbor Acts of August 18, 1894, June 3, 1896,
March 2, 1907, and March 2, 1919. The total costs and expenditures
prior to the adoption of the existing project in 1930 were $2,133,-
661.58, of which $1,187,977.27 was for new work and $945,684.31 for
maintenance since 1881. For further details, see page 1973 of Annual
Report for 1915.
    Existing project.-This provides for the maintenance of 145 feet
of the west inner breakwater, for an outer west breakwater 4,359
feet in length, of stone-filled timber crib substructure and concrete
superstructure; and for an arrowhead rubble-mound breakwater sys-
tem, west arrowhead breakwater, 2,700 feet long, east arrowhead
breakwater about 2,200 feet long; for dredging to a depth of 21 feet
at low-water datum in the outer harbor east of the Lackawanna coal
trestle and between the harbor lines in the Oswego River north of
the north line of Seneca Street; for dredging the outer harbor west
of the east side of the Lackawanna coal trestle (area B) to a depth
           20196-37-pt. 1----88
1392      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of 16 feet; no dredging to be done within 50 feet of established
harbor lines except in the river; for removal of a part of the west
outer breakwater, the lighthouse pier, and a part of the west inner
breakwater; for the abandonment of the east inner breakwater; for
the elimination from the existing project of the east outer break-
water never constructed; and for the removal of the upper and
lower islands in the Oswego River.
   The project depths are referred to low-water datum for Lake
Ontario, elevation 244 feet above mean tide at New York City.
Ordinary fluctuations of water surface are from 4 feet above to 0.5
foot below low-water datum, and fluctuations due to wind are small.
   The estimate of cost for new work, revised in 1936, is $4,157,000,
which includes $1,188,000, the cost of that part of outer west break-
water included in the existing project. The latest (1935) approved
estimate for annual cost of maintenance is $34,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided inferentially for an
outer breakwater to form the outer harbor (Annual Report for 1870,
pp. 54, 220, 221); act of March 2, 1907, provided for stone riprap
and concrete superstructure under plan (A), (H. Doc. No. 55, 58th
Cong., 2d sess.); act of July 3, 1930, provided for the arrowhead
breakwater; for removal of a part of the west outer breakwater, the
lighthouse pier, and a part of the west inner breakwater; for aban-
donment of the east inner breakwater; elimination from the existing
project of the east outer breakwater (never constructed); removal
of the upper and lower islands in Oswego River; deepening the outer
harbor east of the Delaware, Lackawanna & Western coal trestle and
in the Oswego River north of the north line of Seneca Street to 21
feet; and deepening a 400-foot strip of the outer harbor to a depth
of 16 feet (Rivers and Harbors Committee Doc. No. 24, 71st Cong.,
2d sess.); and deepening to 21 feet between harbor lines in Oswego
River, north of Seneca Street, was authorized by the act of August
30, 1935 (Rivers and Harbors Committee Doc. No. 7, 74th Cong., 1st
sess.).
    The latest published maps are in the two last mentioned documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The State of New York has built a terminal
wharf, 1,000 feet long and 150 feet wide, just west of the river en-
trance. It has a mooring channel on each side 100 feet wide and 23
feet deep at low water. The cost of the work was $348,684. A sec-
ond State-owned terminal is located along the east bank of the river
from the south side of Cayuga Street to the north side of Seneca
Street, about 600 feet long.
   Terminal facilities now existing, in addition to the two State ter-
minals, above mentioned, consist of 2 coal docks, 1 in the outer har-
bor and 1 on the east side of Oswego River; 1 gasoline and oil
dock in the outer harbor; 1 dock owned by the State Naval Militia
in the outer harbor; 10 platform wharves, all but 2 being in the
inner harbor; 1 pulpwood wharf and 1 cement dock, in the inner
harbor; and 2 public wharves at street ends used only for occa-
sional unloading of sand and gravel for public works. The facil-
ities are considered adequate for existing commerce.
         RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT             1393
    Operations and results during fiscal year-New work.-Widening
the Oswego River in the vicinity of East Schuyler Street by con-
tract was in progress and was 99 percent complete at a cost of
$99,580.93. Widening the channel to the harbor lines in the Oswego
River north of Seneca Street by contract was in progress and was
-99 percent complete at a cost of $192,623.27. The cost of new work
for the fiscal year was $292,204.20.
    Maintenance.-Government plant and hired labor removed 75,497
cubic yards of material for restoration of project depth in the west
channel, entrance channel, and outer harbor at a total cost of $20,-
828.91 for maintenance.
    The total cost for the year was $313,033.11, of which $292,201.20
was for new work, and $20,828.91 for maintenance. The total ex-
penditure was $296,148.27.
    Condition at end of fiscal year.-The existing project is about
80 percent completed. Under the existing project there have been
constructed a west inner breakwater; a west outer breakwater, com-
pleted in 1882; a west arrowhead breakwater 2,700 feet long, com-
pleted in 1931; and an east arrowhead breakwater 2,200 feet long,
completed in 1932. The west outer breakwater was originally 6,032
feet long, but was reduced to 4,359 feet in 1931 by the removal of
1,673 feet. The old lighthouse pier and a part of the west inner
breakwater, together with the upper and lower islands in the Oswego
River, were removed in 1931. The Oswego River, to the north line
of Seneca Street, and the outer harbor east of the Lackawanna coal
trestle have been deepened to the project depth of 21 feet, except a
strip about 200 feet wide along the harbor line east of the mouth of
the Oswego River.
    The west outer breakwater consists of a stone-filled timber-crib
substructure with a concrete superstructure. A stone sea slope was
constructed along its lake face to reinforce the stone riprap previ-
ously placed. The concrete superstructure has settled in places and
will require repairs. The arrowhead breakwaters are rubble-mound
structures and are generally in good condition. The east inner
breakwater has been abandoned and all but 145 feet of the west inner
breakwater has been removed. The portion remaining is maintained
for a wharf for Government plant.
    A depth of 21 feet at low-water datum is available in the Oswego
River to the north line of Seneca Street and in the outer harbor east
of the Lackawanna coal trestle except in a 200-foot wide strip along
the harbor line east of the mouth of the Oswego River. The 100-foot
channel in the outer harbor west of the Lackawanna coal trestle has
a controlling depth of 15 feet at low-water datum.
    The work remaining to be done to complete the project is the
deepening of the 200-foot strip along the harbor line east of the
mouth of the Oswego River, the completion of the deepening of the
outer harbor west of the Lackawanna coal trestle to the full width of
400 feet, and completing the widening of the channel to harbor lines
in the Oswego River north of Seneca Street.
    The total cost of the existing project was $3,689,298.91, of which
$3,333,896.18 was for new work and $355,402.73 for maintenance.
The total expenditure was $3.671.066.48.
1394             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

     Proposed operations.-The balance unexpended at the end of the
year together with allotment of $25,500 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937-------------------------------- $18, 232. 43
New work: Completion of widening the channel to harbor lines by
contract, July and August 1937--        ---------------------     25, 227. 07
Maintenance :
    Dredging outer harbor and channel through west
      basin by U. S. hopper dredge Taylor and U. S.
      derrick boat Tonawanda, July 1937 and June 1938_ $8, 000. 00
    Repairs to breakwaters by U. S. derrick boat 'Tona-
      wanda, July and August 1937-                      12, 00. 00
    Sweeping by hired labor, July 1937 and June 1938___ 2, 000. 00
                                                                   22, 000. 00
               Total, new work and maintenance--------------------------                                                    65, 459. 50
   Redredging and sweeping are required annually and repairs to
breakwaters are necessary. For these items of maintenance the addi-
tional sum of $18,000 can be profitably expended during the fiscal
year 1939 as follows:
Dredging by U. S. hopper dredge Taylor, spring 1939------------------ $7, 000
Repairs to breakwaters by Government plant, spring 1939-------------   9, 000                                               --
Sweeping by hired labor, summer 1938-------------------------------2, 000

               Total_-----------------------------------------------------                                                       18, 000
                                           Cost and financial summary
Cost of new work to June 30, 1937_                                                                                 $4, 521, 873. 45
Cost of maintenance to June 30, 1937 -----------                                                -----------         1, 301, 087. 04

      Total cost of permanent work to June 30, 1937                                              ----------          5, 822, 960. 49
Minus accounts payable June 30, 1937----------------------_18,                                                               232. 43

     Net total expenditures------------------ -----------                                                            5, 804, 728. 06
Unexpended balance June 30, 1937---------------------------                                                              39, 959. 50

           Total amount appropriated to June 30, 1937-------------                                                  5 844, 687. 56

           Fiscal year ending June 30                          1933                1934           1935          1936             1937


Cost of new work-------------------$310, 135. 03                            .        ..                                       292, 204.20
Cost of maintenance-          _ _
                       .............. 66, 606. 97                           $179, 017.05       $37, 900 08    $1, 809 39       20, 828. 91
       Total cost.........._._ -   .     ....-..--..      376, 742. 00          179, 017..05    37, 900.08     1, 809. 39     313, 033. 11

Total expended .........                   .... -         453,515.78            183, 975.82     43,986.72        461.80       296,148.27

Allotted....                           .....---------------------------
                                                             418, 043. 76       53,122. 58     -9, 256. 27   177, 693. 50     150, 000. 00


Balance unexpended July 1, 1936-----                                    ----------------------                         $186, 107. 77
Amount allotted from War Department Appropriation
Act approved April 26. 1934-   -    ---            $70, 494. 51
Amount allotted from War Department Appropriation
Act approved May 15, 1936_                          45, 000. 00
Amount allotted from War Department Appropriation
Act approved September 22, 1922-------_ ---------- 34, 505. 49
                                                                                                                        150, 000. 00

      Amount to be accounted for------------------------------.                                                         336, 107. 77
Gross amount expended_--------------- -----                   _                                                         296, 148. 27
Balance unexpended June 30, 1937__
                                ------------------------                                                                    39, 959. 50
               RIVERS AND HARBORS--BUFFALO, N. Y., DISTRICT                   1395
Outstanding liabilities June 30, 1937_--_--_---------- $5, 143. 18
Amount covered by uncompleted contracts------------ 33, 816. 32
                                                                       $38, 959. 50

     Balance available June 30, 1937__________----------------            1, 000. 00
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-------------------------------                       3, 500.00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_____________-------------22,                          000. 00

           Balance available for fiscal year 1938--------------         26. 500. 00

Amount (estimated) required to be appropriated for completion
of existing project__       _    ___-__--          --                '1703, 000. 00
Amount that can be profitably expended in fiscal year ending June
      30, 1939, for maintenance 1__________________________________     18,   000.00
      1 Exclusive of available funds.

                            20. CAPE VINCENT HARBOR, N. Y.

   Location.-On the south bank of the St. Lawrence River, 21/2 miles
from Lake Ontario and 49 miles northerly from Oswego, N. Y. (See
U. S. Lake Survey Chart No. 21.)
   Previous projects.-Adopted by River and Harbor Act of June 3,
1896. The cost and expenditures were $247.29 for surveys, and
charged to new work. For further details of previous project see
page 1975 of Annual Report for 1915.
   Existing project.-This provides for a timber-crib breakwater 1,500
feet long in the St. Lawrence River parallel to and 500 feet from the
railroad wharf, 150 feet, or as much of the breakwater as required,
to be shore return at the upper end.
   The estimate of cost for new work, revised in 1926, is $252,000,
exclusive of amounts expended under previous projects. The latest
 (1918) approved estimate for annual cost of maintenance is $500.
   The existing project was adopted by the River and Harbor Act of
March 3, 1899 (Annual Report for 1897, pp. 3286-3288). The latest
published map is in the Annual Report for 1903, page 2165.
   Terminal facilities.-The package-freight and passenger wharf of
the New York Central Railroad Co., also used by the passenger ferry
'to and from Kingston, Ontario, Canada; one hay wharf; one fueling
wharf; and one private merchandise wharf having no railroad
connection.
   These facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project is 79 percent com-
pleted. The work done under the existing project has been the con-
struction of a breakwater 1,381.3 feet long, of which 50 feet of the
upstream end is shore return. The breakwater is of the timber-crib,
concrete-superstructure type, and is in good condition, except that
the surface of the concrete is disintegrating and is scaled off to a
depth of 3 or 4 inches in places. The available depth in the approach
to and around the breakwater is 17 feet at low-water datum. The
work remaining to be done to complete the project is the construction
of 118.7 linear feet of breakwater, which is considered unnecessary at
the present time.
   The total cost under the existing project to the end of the fiscal
year was $226,752.71, of which $198,819.03 was for new work and
$27,933.68 for maintenance. The total expenditures was $226,752.71.
1396       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-The allotment of $6,000 made in July. 1937
will be applied to repairs to the breakwater by hired labor during
August 1937.
  The concrete superstructure on the breakwater requires repairs.
The sum of $25,000 can be profitably expended for this maintenance
work, by contract, during the fiscal year 1939.
                              Cost and financial summary
Cost of new work to June 30, 1937--------------------------- $199, 066. 32
Cost of maintenance to June 30, 1937--------------------------- 27, 933. 68

      Total cost of permanent work to June 30, 1937-----------                      227, 000. 00
Net total expenditures-------------------------------------                         227, 000. 00
Total amount appropriated to June 30, 1937                                          227, 000. 00

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937__ -------------------------------------                       6, 000.000
Amount available for fiscal year 1938.__ ___________---------                         6, 000. 00

Amount (estimated) required to be appropriated for completion of
existing project ---------------------------------------                            53, 200. 00
Amount that can be profitably expended in fiscal year ending June
                               1--- -      - - - - - - - - - _- - - - - -
30, 1939, for maintenance                                  ______        ____25,        000. 00
   Exclusive of available funds.

                        21. MORRISTOWN HARBOR, N. Y.

   Location.-This harbor is located in Morristown Bay, a small inlet
on the south bank of the St. Lawrence River, 51 miles by water from
Lake Ontario. (See U. S. Lake Survey Chart No. 14.)
   Existing project.-This provides for a channel 150 feet wide and
9 feet deep, from the 9-foot contour in the St. Lawrence River to,
within 250 feet of the Northumberland Street Bridge, at Morristown,.
N. Y.
   The project depth is referred to the river surface, when Lake
Ontario is at low-water datum, elevation 244.0 feet above mean tide-
at New York City. Ordinary seasonal fluctuations of water surface
are from about 3.7 feet above to low-water datum. Other fluctuations
due to wind and other causes are small.
   The estimated cost of new work, made in 1926, was $12,500. The
latest (1926) approved estimate for annual cost of maintenance is
$400.
   The existing project was adopted by the River and Harbor Act of
January 21, 1927 (H. Doc. No. 371, 69th Cong., 1st sess.). The latest
published map is in the project document.
   Terminal facilities.-There are four wharves, all privately owned
and all located on the east side of the bay. The wharf nearest the
river is owned by the New York Central Railroad Co., is about 100
feet long, and has sufficient depth of water in front of it to permit
the landing of all small river boats. Next south is the wharf of the
W. H. Comstock Co.; the wharf of the Brockville & Morristown
Ferry Co.; a public wharf which extends to the south side of Wash-
ington Street; and next to this is the wharf of the Morristown Lum-
ber Co. Generally these wharves are open to the public on equal
terms. The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. derrick boat
Niagara removed 10,133 cubic yards from the channel at a cost and
expenditure of $8,400, for maintenance.
                RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                         1397
   Condition at end of fiscal year.-The existing project was completed
in 1928 at a saving of $6,279 under the estimated cost. The control-
ling depth in the channel is 9 feet at low-water datum. The total
cost and expenditure of the existing project was $15,100, of which
$6,220.93 was for new work and $8,879.07 for maintenance.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal years 1938 or 1939.
                                    Cost and financial summary
Cost of new work to June 30, 1937---------------------------       $6,220. 93
Cost of maintenance to June 30, 1937------------------------------ 8, 879. 07
      Total cost of permanent work to June 30, 1937__-------------                         15, 100. 00
Net total expenditures___________________________                                          15, 100. 00
Total amount appropriated to June 30, 1937--------------------                             15, 100.00

           Fiscal year ending June 30          1933        1934           1935    1936             1937


Cost of new work..----------------------------------------------------------------
Cost of maintenance--. __                         ------------
                                        _---------------------------- ----- ------------
                                                                                    ..   $8,400
Total expended        -----------------------------------------------------------------                    8,400
Allotted    .        ------------------------------------------------------------$8, 400    ............

Balance unexpended July 1, 1936-------------                                             - $8, 400.00
Gross amount expended----                   -----------    --------------------             8,400.00

                              22. OGDENSBURG HARBOR, N. Y.

   Location.-This harbor is located on the south bank of the St.
Lawrence River 62 miles by water from Lake Ontario. (See U. S.
Lake Survey Chart 13.)
   Previous projects.-Adopted by River and Harbor Acts of March
2, 1867, August 2, 1882, and September 19, 1890; by authority of
the Chief of Engineers dated February 27, 1897; and by River and
Harbor Act of March 3, 1899. The cost and expenditures were
$401,892.14, of which $271,379.82 was for new work and $130,512.32
for maintenance. For further details of previous projects, see page
1975 of Annual Report for 1915.
   Existing project.-This provides for an upper entrance channel
400 feet wide, a city water-front channel 350 feet wide, and for a
lower entrance channel 250 feet wide, all suitably widened at entrances
to, and at angles in channels, and all 19 feet deep; and for a lower
basin 2,400 to 3,500 feet wide and 21 feet deep, extending from deep
water in the river to within 50 feet of the existing dock lines.
   The project depths are referred to the river surface when Lake
Ontario is at low-water datum, elevation 244 feet above mean tide
at New York City. Ordinary seasonal fluctuations of water surface
are from 4 feet above to 0.5 foot below low-water datum. Other
fluctuations due to wind and other causes are small.
   The estimate of cost for new work, revised in 1935, is $387,500,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $10,000.
   The existing project was adopted by the following river and harbor
acts: The act of June 25, 1910, provided for the several channels 19
feet deep and generally 300 feet wide (H. Doc. No. 920, 60th Cong.,
1398       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

1st sess.); act of March 2, 1919, provided for widening of the upper
entrance channel to 400 feet and of the city-front channel to 350 feet
(H. Doc. No. 663, 64th Cong., 1st sess.) the Public Works Adminis-
tration, September 6, 1933, and the act of August 30, 1935, provided
for enlarging and deepening the lower basin to 21 feet and the
removal of the old elevator wharf (H. Doc. No. 266, 72d Cong., 1st
sess.). The latest published maps are in the two last-mentioned docu-
ments.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The principal freight wharves are those of
the New York Central Railroad Co. and the Rutland Railroad Co.
The former is located on the west side of the Oswegatchie River.
Transfer of freight between Ogdensburg and Prescott, Ontario, Can-
ada, is by car ferry. The Rutland wharf is situated in the lower
harbor, with a frontage of 2,300 feet.
   There are two grain elevators, one with storage capacity of 500,000
bushels and the other of 90,000 bushels; four coal docks, for handling
and storing both hard and soft coal; one lumber wharf, little used;
one dock used for the transfer of package freight and gasoline; two
docks on the west side of the Oswegatchie River used for the transfer
of petroleum products; two small wharves, known as the Plumb
and Hacket, are used mainly for summer passenger traffic, excur-
sion boats; one wharf used by a passenger ferry that operates during
the entire year between Ogdensburg and Prescott, Ontario, Canada,
on the opposite shore of the St. Lawrence, a distance of about 1 mile.
Generally the wharves are open to all water carriers on equal terms.
There is also one public wharf located in the central harbor used as a
passenger landing during the summer months, open to all water
carriers free of charge. These facilities are considered adequate for
the existing commerce.
   Operations and results during fiscal year.-Government plant and
hired labor removed 90,560 cubic yards of material for restoration
of project depth in the channels at a total cost of $23,651.92 for
maintenance. The total expenditure was $30,705.55.
   Condition at end of fiscal year.-The existing project is about 97
percent completed. Removal of the elevator wharf and deepening of
the lower basin was completed in 1935, except for removal of hard-
material shoals which remains to be done to complete the project.
   There is a controlling depth of 18 feet in the channels, and a
depth of 20 feet in the lower basin, at low-water datum.
   The total cost of the existing project was $613,475.50, of which
$375,085.40 was for new work and $238,890.10 for maintenance. The
total expenditure was $613,156.84.
   Proposed operations.-The balance unexpended at the end of the
year together with allotment of $28,300 made in July 1937, will be
applied as follows:
Accounts payable June 30, 1937-----------------------------------     $318. 66
Maintenance:
    Dredging by U. S. hopper dredge Taylor and U. S.
      derrick boat Tonawanda, August 1937 and May and
      June 1938 ------------------------------------- $28, 589. 44
    Sweeping by hired labor, July 1937                   2, 000. 00
                                                         -------    30, 589. 44

       Total ----------------                     __       _   -- -_30,   908. 10
               RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                          1399
  Dredging and sweeping are required annually. For these items of
maintenance, the additional sum of $36,000 can be profitably ex-
pended during the fiscal year 1939, as follows:
Dredging by U. S. hopper dredge Taylor, spring 1939_____-- __------- $24, 000
Removal of boulders by Government plant and hired labor, fall 1938__ 10, 000
Sweeping by hired labor, spring 1939____________----------------       2, 000

   Total ----------------------------                              _------------------------------              36,000

                                       Cost and financial summary
Cost of new work to June 30, 1937_________----------------------                                     1$646, 465. 22
Cost of maintenance to June 30, 1937_---------------------------                                         368, 902. 42

     Total cost of permanent work to June 30, 1937------------ 1, 015, 367. 64
Minus accounts payable June 30, 1937---------------------- -----       318. 66

     Net total expenditures_-------------------------------      1, 015, 048. 98
Unexpended balance June 30, 1937_ ___  ----------    ____   ----      2, 608.10

         Total amount appropriated to June 30, 1937______________11, 017, 657. 08

         Fiscal year ending June 30                 1933           1934           1935           1936               1937


Cost of new work____
                  ... .. _          __ .-_-                  $10, 642.17
                                                     -..........               $94, 862.77    $69, 043. 85 ..----
Cost of maintenance- .        .
                             -... ..------       $44, 064. 18    12, 517. 20    56, 437.90      8, 562. 30     $23, 651. 92
      Total cost--------       ---------------    44, 064. 18    23, 159. 37   151, 300. 67    77, 606. 15      23, 651. 92

Total expended_------.............-...---     - 44, 989.88       11, 709. 77   143, 299.84     90, 001. 43      30, 705. 55

Allotted-.....---.--..----.------..--             45, 000.00    209, 600. 00    64, 900.00      6, 748.79      -8, 000. 00


                               ------------------------------
Balance unexpended July 1, 1936__                                                                        $41, 313. 65
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------------------                                                 7, 000. 00

     Amount to be accounted for------------------------------                                                48, 313. 65
Deductions on account of revocation of allotment__--__----------                                             15, 000. 00

      Net amount to be accounted for  ------                                                                 33, 313. 65
Gross amount expended----------------------------------------                                                30, 705. 55

      Balance unexpended June 30, 1937__________-------------                                                 2,608. 10
Outstanding liabilities June 30, 1937____--- __-----------------                                              2,608. 10

Amount allotted from War Department Civil Appropriation Act
aiproved July 19, 1937--------------------------------------                                                28, 300. 00
Amount available for fiscal year 1938----------------------------                                            28, 300. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - __                     36,000. 00
1 Includes $174,548.79 Public Works funds.
   2 Exclusive of available funds.

    23. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The total cost of the work during the fiscal year was $92,509.91,
and the expenditure was $97,305.06. The balance unexpended at
the end of the year, $3,406.67, together with an allotment of $40,000
made in July 1937, will be applied to general expenditures incurred
under this heading. The additional sum of $40,000 can be profitably
expended during the fiscal year 1939.
1400           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                 Cost and financial summary
Cost of new work to June 30, 1937__    ---------  __------                                                                                 ------------
Cost of maintenance to June 30, 1937--------- ____---------                                                                                      $463, 467. 96

     Total cost of permanent work to June 30, 1937-----------                                                                                        463, 467. 96
Minus accounts payable June 30, 1937----------------                                                                                                   2, 344. 49

     Net total expenditures-------------------------------                                                                                           461, 123. 47
Unexpended balance June 30, 1937_11111111111111111_ _                                                                                                  3, 406. 67

           Total amount appropriated to June 30, 1937-----------_-                                                                                   464, 530. 14

           Fiscal year ending June 30                                     1933                    1934               1935               1936                     1937

Cost of new work--....................--                             ..........................
Cost of maintenance------_------
                           _                                ---      $47, 220. 57         $59, 166. 96           $45, 951.26    $91, 960.00                    $92, 509. 91

Total expended_------.................- .                   -         44, 409. 17           61, 502. 94           43, 617. 63        90, 167. 70                97, 305. 06

Allotted       --        ------...................................    54, 838. 16          70, 803. 49            52, 000. 00   121, 000. 00                    35, 000. 00


Balance unexpended July 1, 1936--__--------------------------                                                                                        $65, 711. 73
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-----------------------------       ------                                                                                        35, 000. 00
      Amount to be accounted for-------                                                                                                               00, 711. 73
                                                                                                                                                     1---------------------
Gross amount expended                                                                                                                                  7, 305. 06
                                                                                                                                                      9------------------------------

      Balance unexpended June 30, 1937-----------------------                                                                                              3, 406. 67
                                    ------------------------
Outstanding liabilities June 30, 1937                                                                                                                      3, 406. 67
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937------------------------------------                                                                                            40, 000. 00
Balance available for fiscal year 1938_______________-_____ _                                                                                           40, 000. 00

Amount that can be profitably expended in fiscal year ending
                                    -
June 30, 1939, for maintenance 1 ___ ________ ________  __                                                                                             40, 000. 00
   1 Exclusive of available funds.

24. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                     [Commercial statistics for these projects are given in part 2 of report]

                                                                                  For last               Cost and expenditures to                        Estimated
                                                                                   full                        June 30, 1937                              amount
                    Name of project                                              report see                                                              required to
                                                                                annual                                                                  required to
                                                                              reportfor-                 New work           Maintenance                  complete

1. Sacketts Harbor, N. Y.1__.--
2. Waddington Harbor, N. y.3-------....
                                                                -------
                                                                      -------1932
                                                                                     1898                2             0_0
                                                                                                             $20, 000. 00            .......................
                                                                                                             235, 500. 00----------------                          $20, 000
3. St. Lawrence River between
                            1-                         -Ogdensburg,
     N. Y., and Lake Ontario ..                                                      1935                    515, 977. 72       .)

  I Channelsand protection adequate for commerec.
  2 Amount includes maintenance. Not separable.
  s No work has been done on the existing project and none proposed pending consideration of major im-
provement of St. Lawrence River.
  + No approved estimate for completion to full project width and depth.

              25. PLANT ALLOTMENT FOR BUFFALO, N. Y., DISTRICT *

                                                    Cost and financial summary
Undistributed costs June 30, 1937                                                                                                            $1, 165,323. 00
Plus accounts receivable June 30, 1937_-_---                                                       -------------                                  56, 090. 50
           Gross total costs to June 30, 1937-- --------------------                                                                             1, 221, 413. 50
                   RIVERS AND HARBORS-BUFFALO, N. Y., DISTRICT                                                                                                          1401
IMinus accounts payable June 30, 1937---                                                                    --------------- _                               $54, 260. 99

      Net total expenditures_ _---_____-------........                                                                                                    1, 167, 152. 51
Unexpended balance June 30, 1937---------------------------                                                                                                  108, 381. 72

           Total amount appropriated to June 30, 1937---------                                                                                -           1, 275, 534. 23

    Fiscal year ending June 30                            1933                              1934                           1935                   1936              1937


Total expended--------....--------------..                                 --------------                     $1, 385, 839. 16              $22, 870. 63     -$241,     557. 28
Allotted ---------------                     ---------------------------                                          1, 424, 642. 87          -34, 108. 64       -115,     000. 00


Balance unexpended July 1, 1936------------------------------                                                                                             -$18,  175. 56
Deductions on account of revocation of allotment--------- ---                                                                                               115, 000. 00
           Net amount to be accounted for------------------------                                                                                         -- 133, 175. 56
-Gross amount      expended-------------------------__ $158,986. 99
Less--
    Reimbursements collected--------$399, 281.86
    Receipts from sales ----             , 262. 41
                                        1----------
                                                                                                                                400, 544. 27
                                                                                                                                                          -241, 557. 28
      Balance unexpended June 30, 1937__                                                                                                                    108, 381. 72
Outstanding liabilities June 30, 1937---------------------------                                                                                             88, 035. 04
     Balance available June 30, 1937----- --------------------                                                                                               20, 346. 68
Accounts receivable June 30, 1937 ------------------------------                                                                                             56, 090. 50

           Unobligated balance available June 30, 1937 ---------                                                                                             76, 437. 18
Status of reports called for by river and harbor acts and committee resolutions

                                                                                       Transmitted                          Document no.                   Recommenda-
           Locality                   Authorization Act                                to Congress                          Dcument no                         tion

Barcelona Harbor, N. Y. River and Harbor Act,                                         Nov.       7,1936                                                   Unfavorable.
                             Aug. 30, 1935.
  Big Sandy Creek and Rivers and Harbors                                               Nov.       6, 1936                                                         Do.
    Mexico Bay, N. Y.        Committee resolu-
                             tion, Feb. 14, 1936.
 'Buffalo Creek, N. Y. Flood Control Act,
    (preliminary examina-    July 30, 1937.
    tion and survey).
 'Buffalo Harbor, N. Y.._ Rivers and Harbors                                           Dec. 10, 1936                                                              Do.
                             Committee resolu-
                             tion, Apr. 1, 1936.
Buffalo harbor, River, Rivers and Harbors                                            do........
                                                                                  ....-----                                                                       Do.
    and Ship Canal, N. Y.    Committee resolu-
*Cattaraugus
    N. Y.
                             tion, Apr. 28, 1936,
                   C reek, River and Harbor Act,
                             Aug. 30, 1935.                                       . . . . .. . . . . ---
                                                                                                                    -------
                                                                                                                          ---      -
                                                                                                                            --------
 ,Cayuga Creek, N. Y. Flood Control Act,                                                                            --- ---------- ----
    (preliminary examin-     July 30, 1937.                                       .......             -- --
    ation and survey).
'Cazenovia Creek, N. Y. -----....
                               do.................
    (preliminary examin-                                                          ...............
                                                                                                                    ----     ----   ----   ----     ---

    ation and survey).
Cleveland Harbor, Ohio, Rivers and Harbors
    including channel in     Committee resolu-
    Cuyahoga River.          tion, Mar. 24, 1937.                                 ..    -    --   -    --     -



'Cleveland Harbor, Ohio, Rivers and Harbors
    outer harbor.            Committee resolu-                                    .........                 ---
                             tion, Apr. 13, 1937.
,Conneaut Harbor, Ohio, Rivers and Harbors
    inner harbor.            Committee resolu-                                    .. . -- - -- -
                             tion, Feb. 10, 1937.
-ConneautHarbor, mod- Rivers and Harbors
    ifying existing project. Committee resolu-
                             tion, May 5, 1937.                                   . . . -- - -- -
!Erie Harbor, Pa., Beach River and Harbor Act,
    No. 2.                   Aug. 26, 1937.
1402        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

       Status of reports called for by river and harbor acts and committee
                              resolutions-Continued


                           Authorization Act      Transmitted
                                                  to Congess        Document no.        Recommenda-
                                                                                            tion
        Locality


Great Lakes-Atlantic         Rivers and Harbors
tidewaters deep water-        Committee resolu-
ways.                         tion, Mar. 7, 1928.
Huron Harbor, Ohio--....     Rivers and Harbors Dec. 12, 1936---        .------..--.---  Unfavorable.
                               Committee resolu-
                               tion, Apr. 28, 1936.
New York State Barge River and Harbor Act, ...............
  Canal from Three Riv-        Aug. 30, 1935.
                                                               _-...------.....
  ers Point to Syracuse,
  N. Y.
Onondaga Creek, Onon- Flood Control Act,
  daga County, N. Y.           Apr. 10, 1936.
  (preliminary examina-
  tion for flood control).
Port Ontario Harbor, River and Harbor Act, Jan. 5,1937 ---------..------.                    Do.
  N. Y.                        Aug. 30, 1935.
Rochester (Charlotte) River and Harbor Act, ................................
  Harbor, Genesee Riv-         Aug. 26, 1937.
  er, N. Y.
Rocky River Harbor, River and Harbor Act, Nov. 10, 1936 House, 70, 75th Cong.,           Favorable.
  Ohio.                        Aug. 30, 1935.                    1st sess.
Sandusky Harbor, Ohio. Rivers and Harbors Jan. 7, 1937 -.-           -----..-.           Unfavorable.-
                               Committee resolu-
                               tion, Apr. 28, 1936.
Scajaquada Creek, Buf- Rivers and Harbors .....       do-...... Rivers and Harbors Favorable.
  falo, N. Y.                  Committee resolu-                 Committee, 14, 75th
                               tion, July 31, 1936.
Vermilion Harbor, Ohio._ River and Harbor Act, Apr. 2, 1937_
                               Aug. 30,1935.
                                                                 Cong., 1st sess.
                                                                                   _
                                                                      _ _ __ ____-___ __Unfavorable.
     Do---.......--.--     _ Rivers and Harbors
                               Committee resolu-
                               tion, June 16, 1937.
Wilson Harbor, N. Y.._ River and Harbor Act, Jan. 23, 1937 ----------------------            Do.
                               Aug. 30, 1935.
     Do--------------..................
                             River and Harbor Act, ----------------------------
                               Aug. 26, 1937.
                             Rivers and Harbors
     Do-..............-------------...
                               Committee resolu-
                               tion, May 12, 1937.



IMPROVEMENT OF RIVERS AND HARBORS IN THE LOSS
          ANGELES, CALIF., DISTRICT

   This district comprises that part of California which lies south of
Cape San Martin (about 265 miles north of the entrance to Lose
Angeles Harbor) and south of the San Joaquin Valley drainage
basin, together with the drainage basin of the Colorado River and its.
tributaries.
   District engineer: Maj. Theodore Wyman, Jr., Corps of Engineers.
   Division engineer: Col. T. H. Jackson, Corps of Engineers, to Sep-
tember 1, 1936, and Col. John J. Kingman, Corps of Engineers, since
that date.
                                          IMPROVEMENTS

                                               Page                                               Page,
1.   San Diego Harbor, Calif_ -.-           1403          FLOOD-CONTROL PROJECTS
2.   Newport Bay Harbor, Calif__            1407
3.   Los Angeles and Long Beach                     7. Los Angeles County flood con-
       Harbors, Calif__ ___     -              1409      trol and water conserva-
4.   Santa Barbara Harbor, Calif_              1413      tion, Calif    _                         1417
5.   San Luis Obispo Harbor,                        8. Los Angeles County drainage
       Calif_-----------------                 1415      area, Calif., flood control _            1420-
6.   Examinations, surveys, and                     9. Santa Ana River, Calif., flood
       contingencies (general) _-..            1416      control________                          1422
     RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT*            1403
                    1. SAN DIEGO HARBOR, CALIF.

   Location.-San Diego Harbor is located just north of the United
States-Mexico boundary line, and is about 96 and 506 miles southeast
of Los Angeles Harbor and San Francisco Bay, respectively. (See
U. S. Coast and Geodetic Survey Chart No. 5107.)
   Previous projects.-Adopted by the River and Harbor Acts of
August 30, 1852, March 3, 1875, September 19, 1890, and June 25, 1910.
The costs and expenditures were $154,703.68 for new work and
$59,904.21 for maintenance, a total of $214,607.89. For further details
see page 1976 of Annual Report for 1915.
   Existing project.-This provides for a rubble-mound jetty 7,500 feet
long on Zuninga Shoal; for an entrance channel 40 feet deep, 800 feet
wide; for removal of Middle Ground shoal and widening the entrance
channel to the eastward in that vicinity to a depth of 36 feet; for a
bay channel 35 feet deep and 2,200 feet wide from the vicinity of
Whalers Bight to the naval air station; for an anchorage area north-
ward of the bay channel 1,200 feet wide, 12,000 feet long, and 35 and
26 feet deep in the easterly and westerly halves, respectively; for a
seaplane basin 1,500 feet wide, 12,000 feet long, and 8 feet deep land-
ward of the anchorage area; for a turning basin 35 feet deep opposite
the municipal piers; for a channel approximately 20,000 feet long,
1,500 to 2,500 feet wide, and 30 feet deep in the southerly part of the
bay; for a channel to National City and Chula Vista 20 feet deep and
200 feet wide; and for an earthen dike 7,735 feet long to divert the
San Diego River from San Diego Bay to False Bay. The plane of
reference is mean lower low water. The range between mean lower
low water and mean higher high water is 5.6 feet. The extreme range
is about 9 feet.
   The estimated cost for new work, revised in 1937, is $7,624,000,
exclusive of amounts expended on previous projects, and $10,000
to be contributed by local interests. The latest (1937) approved
estimate for annual cost of maintenance is $40,000, of which $20,000
is for entrance-channel dredging and $20,000 for bay dredging.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1875, provided for the diversion
dike (Annual Report, 1873, p. 1142); act of September 19, 1890,
provided for the jetty on Zuninga Shoal (H. Doc. No. 177, 50th
Cong., 1st sess.); act of March 4, 1913, provided for a 35-foot
channel through the outer bar (H. Doc. No. 1309, 62d Cong., 3d
sess.); act of July 27, 1916, provided for widening the approach
 (area B) to San Diego municipal pier no. 2 by dredging area C
 (north of area B) (H. Doc. No. 648, 64th Cong., 1st sess.); act of
August 8, 1917, provided for dredging area A (south of area B)
 (Rivers and Harbors Committee Doc. No. 8, 64th Cong., 2d sess.),
and for dredging the 35-foot channel through the Middle Ground
 (H. Doc. No. 140, 65th Cong., 1st sess.); act of September 22,
1922, provided for dredging areas D and E (H. Doc. No. 1000, 66th
Cong., 3d sess.); act of March 3, 1925, provided for widening the
approach (area C) to San Diego municipal pier no. 1 by dredging
a portion of area F (north of area C) (Rivers and Harbors Commit-
tee Doc. No. 2, 68th Cong., 1st sess.); act of July 3, 1930: pro-
1404    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

vided for the 40-foot channel through the outer bar, for dredging
along the south and north banks of the main channel, for dredging
the turning basin, for dredging area H, and for dredging channel
to National City and Chula Vista (S. Doc. No. 81, 71st Cong., 2d
sess.); the act of August 30, 1935, provided for the widening of
the bay channel to 2,200 feet with a depth of 35 feet from the vicinity
of Whalers Bight in the lower bay to the naval air station opposite
the turning basin (H. Doc. No. 223, 73d Cong., 2d sess.). Prior to
adoption by the River and Harbor Act of 1935, the enlarged project
contained in the latter document was authorized May 28, 1935, by
the Emergency Relief Appropriation Act of April 8, 1935. The
act of August 26, 1937, provided for dredging areas Q, Q-1, M, N,
and O (Rivers and Harbors Committee Doc. No. 89, 74th Cong.,
2d sess.).
   The latest published map is in the last-described document.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that before any work is undertaken on the turning basin
local interests shall furnish necessary disposal areas and give assur-
ances satisfactory to the Secretary of War and the Chief of Engi-
neers that they will deepen areas adjacent to the municipal piers to
depth of 35 feet, and that before any work is undertaken on the
channel to Chula Vista local interests shall contribute $10,000 in cash.
These conditions have been complied with, except in the case of the
channel to Chula Vista.
   The modification of the project authorized in the act of August
26, 1937, provides that the Chief of Engineers may, at his discretion,
direct the disposal of dredged materials on lands not under Govern-
ment ownership, provided local interests reimburse the United States
for the excess costs involved.
   Terminal facilities.-There are 46 wharves on the water front of
San Diego, 2 at Coronado, and 1 at North Island. The existing
terminal facilities are considered adequate. (See Port Series No. 13,
pt. 2, Corps of Engineers.)
   Operations and results during fiscal year-New work.-There were
no operations with regular funds. Contract dredging with Emer-
gency Relief funds was continued, 2,827,850 cubic yards of material
were dredged from Bay Channel and deposited along the shore of
North Island, reclaiming an additional 250 acres. The work was
completed October 16, 1936. A total of 13,754,850 cubic yards of ma-
terial were dredged under the contract and deposited to reclaim a
total of about 557 acres.
   The cost of new work was $255,018.58 and expenditures were
$379,072.98 from Emergency Relief funds.
   Condition at end of fiscal year.-All items which were included
in the existing project prior to the modification approved August
26, 1937, except for dredging the channel to Chula Vista, were com-
pleted in 1936 at a saving of $655,306 under the original estimated
cost. San Diego River dike was completed in 1876, Zuninga Shoal
jetty in 1904, the entrance channel to a width of 800 feet and depth
of 40 feet in 1934, and the bay channel to a width of 2,200 feet and
depth of 35 feet in 1936. The jetty has deteriorated to the extent
of about 75,000 tons of stone displaced. At the end of the fiscal year
           RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                                                         1405
the controlling depths were as follows: 40 feet for a width of 650
feet in the entrance channel, 35 feet in the bay channel and turning
basin, 1 foot in the anchorage area, plus 1 foot in the seaplane basin
and 16 feet in the south bay and Chula Vista channels.
  The total cost and expenditures of the existing project were:

                                                                                                  Costs
                               Funds                                                                                                        Net expendi-
                                                                                                                                                tures
                                                                            New work          Maintenance               Total


United States funds:
    Regular_ __________-_.-            -----
                              ___ ___.---         $2, 101, 909. 65                              $112, 588. 95 $2, 214, 498. 60              $2,214,498. 60
    Public Works _________-_ _______._ __.___.. _      86, 352. 01                                                 86, 352. 01                   86, 352. 01
    Emergency Relief_ __          -_____________   1, 226, 792. 92                                           _ 1, 226, 792. 92               1, 226, 792. 92
     Total United States funds___.--....        ..   3, 415, 054. 58 -----                                          3, 527, 643. 53          3, 527, 643. 53
Contributed__----
            .....    -__.                -_________
                                            -       -__ 4, 440. 59                           --------------              4, 440. 59               4, 440. 59
         Total all funds---......__            ....          _----    _    3, 419, 495. 17       112, 588. 95       3, 532, 084. 12          3, 532, 084. 12



     Proposed operations.--An allotment of $25,000 made during July
1937 will be applied to maintenance dredging in the entrance and bay
channels by Government hopper dredge during November and
December 1937.
  The additional sum of $1,500,000 can be profitably expended during
the fiscal year 1939, to be applied to new work dredging, by con-
tract, in the anchorage area and seaplane basin.
                                                      Cost and financial summary

                                          MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937 --- __--                                           ____--                               1   2    $2, 342, 965. 34
Cost of maintenance to June 30, 1937___________---------___                                                                            172, 493. 16
      Total cost of permanent work to June 30, 1937- --------                                                                         2, 515, 458. 50
Net total expenditures ----------------                    _  1                                                                   2   2, 515, 458. 50
Total amount appropriated to June 30, 1937-----------------1                                                                      2   2, 515, 458. 50

             Fiscal year ending June 30                                   1933           1934                1935             1936                  1937


Cost of new work_                     -____-...
                                             ____-__                 $156, 394. 68 $86, 352. 01       .
Cost of maintenance_                        -       -___
                                                  -______              21, 167. 79 -------------                -------------....                     $67. 90
         Total cost.-_ -__---------                                  177, 562. 47     86, 352. 01            _ _

Total expended.......----------------------175, 893. 32                               87, 996. 16 ------------...                 $67. 90       -


Allotted--.........----...................----------------------      193, 593. 30    67, 987. 43         $50, 000. 00 -49,       932. 10


Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937__________----------------_____  ___                                                                             $25, 000. 00
Amount available for fiscal year 1938------------------------                                                                            25, 000.00
Amount (estimated) required to be appropriated for comple-
  tion of existing project" ---------------------------------                                                                         4, 204, 000. 00
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for new work                       _                                                                                 1, 500, 000. 00
1 Exclusive of $4,440.59 expended from contributed funds.
   Includes $86,352.01 expended from Public Works funds.
     2

s Exclusive of available funds.
 'In addition $10,000 to be contributed by local interests.
1406               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                               EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937_---------___                                                      -                  $1,226, 792. 92
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937     __-                                                             1___-
                                                                                                                        1, 226, 792. 92
Net total expenditures-----------------------------------                                                                1,226, 792. 92
Total amount appropriated to June 30, 1937__                                                                            1_____________-
                                                                                                                        1, 226, 792. 92

     Fiscal year ending June 30                  1933                  1934                  1935               1936              1937


Cost of new work______________ _____-----                __         _____ __          ____________    $971,774.34               $255, 018. 58
Cost of maintenance .. - --------                        ---     -------------        --------     -----------                    --------

'Total expended------......            _ _
                                  ----------       __ ___________                         ______
                                                                                __ .._ _.........          847, 719. 94          379, 072. 98

Allotted....---------------------------                        --------------          $1, 800, 000       -524, 977. 47         -48, 229. 61


Balance unexpended July 1, 1936________ ______________________                                                              $427, 302. 59
Deductions on account of revocation of allotment________________                                                              48, 229. 61

       Net amount to be accounted for_-...... __. __ ____                                                        ____       379, 072. 98
Gross amount expended-_--------_--_------------------                                                                      379, 072. 98

    CONSOLIDATED               COST AND FINANCIAL                SUMMARY             FOR SAN            DIEGO HARBOR,           CALIF.

,Cost of new work to June 30, 1937----------______________                                                        1 $3, 569, 758. 26
Cost of maintenance to June 30, 1937__---__----------                                                                       172, 493. 16

      Total cost of permanent work to June 30, 1937__________                                                      12 3, 742, 251.42
Net total expenditures____________                                                                                 123, 742, 251.42
Total amount appropriated to June 30, 1937__--___   ________                                                       1 2 3, 742, 251.42


     Fiscal year ending June 30                  1933                  1934                  1935               1936              1937


Cost of new work ---------------                   394. 68
                                               $156,              $86, 352. 01      --------------        $971, 774. 34        $255, 018. 58
Cost of maintenance--.. - - . -                 21, 167. 79      __
                                                                  -             -       ..                  .     __    .                67. 90
        Total cost ...---------------          177, 562. 47           86, 352. 01                          971, 774. 34         255, 086. 48

'Total expended---....-------------            175, 893. 32           87, 996. 16               -          847, 787. 84         379, 072. 98

Allotted_---------------------                 193, 593.30            67, 987. 53 $1, 850, 000. 00       -574, 909. 57          -48, 229. 61


Balance unexpended July 1, 1936______________________                                                              _     $427, 302. 59
Deductions on account of revocation of allotment_---________                                                                  48, 229. 61

            Net amount to be accounted for                              ______________________                              379, 072.98
Gross amount expended-----------------------                                                                                379, 072.98

Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937_______-------------    -------------                                                                 25, 000. 00
Balance available for fiscal year 1938____--------------      -----                                                           25, 000. 00

Amount (estimated) required to be appropriated for completion
of existing project _____________________________________    4, 204, 000. 00

Amount that can be profitably expended in fiscal year ending
                               - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,500, 000. 00
June 30, 1939, for new work 3
   1 In addition, $4,440.59 was expended from contributed funds.
   2Includes $86,352.01 Public Works funds.
   sExclusive of available funds.
   * In addition, $10,000 to be contributed by local interests.
     RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT              1407
                  2. NEWPORT BAY HARBOR, CALIF.

   Location.-This harbor is 24 miles southeast of Los Angeles-Long
Beach Harbor, and 72 miles northwest of San Diego Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 5108.)
   Existing project.-This provides for entrance jetties, 900 feet apart,
2,860 and 1,620 feet in length on the east and west sides of the chan-
nel, respectively; an entrance channel 20 feet deep and 500 feet wide;
a main channel 20 feet deep and generally 200 feet wide from the
entrance to the westerly end of the bay; a yacht anchorage 15 feet
deep, 1,200 feet wide, and 1,700 feet long on the south side of the main
channel midway of the bay; for a turning basin 20 feet deep, approxi-
mately 2,000 feet long and up to 1,000 feet wide at the westerly end
of the bay; and for a depth of 10 feet in the remainder of the main
bay area, at a total estimated cost of $1,835,400 for new work, of
which amount local interests contributed $918,000. The project was
recommended by the Chief of Engineers to the Secretary of War
under date of September 25, 1933, and was authorized by the Public
Works Administration June 15, 1934.
   Maintenance of all improvements described above was authorized
by the River and Harbor Act of August 26, 1937, at an estimated
annual cost of $15,000. (Senate Commerce Committee Doc., 75th
Cong.) The latest published map is in the project document.
   The plane of reference is mean lower low water. The range be-
tween mean lower-low water and mean higher high water is 5.1 feet.
The extreme range is about 9 feet.
   Local cooperation.-The maintenance project, adopted by the act
of August 26, 1937, requires local interests to furnish, free of cost
to the United States, suitable spoil-disposal areas as required. All
prior requirements fully complied with.
   In addition to the Federal project requirements, the city of New-
port Beach and Orange County have expended for dredging and
jetty work the sum of $1,670,802 since 1916. Private interests have
spent $639,000 for dredging, etc., making the total expenditure for
harbor improvements by local interests $2,309,802.
   Terminal facilities.-There are numerous small wharves and land-
ings, practically all for yachts.
   Operations and results during fiscal year.-There were no opera-
tions. Expenditures in settlement of outstanding liabilities were
$3,041.18 from Public Works funds and minus $103.17 from con-
tributed funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936 at a saving of $241,600 under the estimated cost. The
jetties are in good condition and full dimensions obtain in the project
channels; 20 feet in the entrance and main bay channels and turning
basin, 15 feet in the yacht anchorage basin, and 10 feet in the side
channels.
   The cost of new work under the existing project was $1,593,793.66,
divided equally between Public works funds and contributed funds.
Expenditures were $796,896.83 from Public Works funds and $796,-
896.83 from contributed funds.
   Proposed operations.-No work is proposed during the fiscal years
1938 and 1939.
     20196-37-pt. 1-89
1408              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                     Cost and financial summary
                                                            PUBLIC WORKS FUNDS

Cost of new work to June 30, 1937--------------------------                                                                                                            $796, 896. 83
Cost of maintenance to June 30, 1937______
      Total cost of permanent work to June 30, 1937                                                                                                                     96, 896. 83
                                                                                                                                                                       7________-_
Net total expenditures   ---------------------------------                                                                                                             796, 896. 83
Total amount appropriated to June 30, 1937                                                                                                                             796, 896. 83

     Fiscal year ending June 30                             1933                          1934                      1935                                     1936                1937


Cost of new work____
                  .. -____                   ___       __.........                        -__-__
                                                                                             .                $460, 910. 86                         $335, 882. 80                  $103. 17
Cost of maintenance ....-
Total expended.------------------------.-.---.-                                                       _           338, 525. 05                          455, 330. 60              3. 041. 18

                                    ..............--------------.
Allotted------.........--------------....                                                 $918, 000   --------------                                    121, 000. 00               -103.   17


Balance unexpended July 1, 1936___ --      ____________________      83144.35
                                                                     $3
Deductions on account of revocation of allotment -------------------    103. 17

      Net amount to be accounted for                                                                                                                                           3, 041. 18
Gross amount expended__---------------          -                                                                              -               $3, 144.35
Less reimbursements collected------------------                                                                         --                         103. 17
                                                                                                                                                                               3, 041. 18
                                                               CONTRIBUTED                       FUNDS


Cost of new work to June 30, 1937         _________                                                                                         796, 896. 83
                                                                                                                             ______________ $__
Cost of maintenance to June 30, 1937-------
      Total cost of permanent work to June 30, 1937_____________                                                                                                        796, 896. 83
Net total expenditures_     ______    ___                                                                                                                               796. 896. 83
Total amount contributed to June 30, 1937----------   ----------                                                                                                        796, 896. 83

             Fiscal year ending June 30                                         1933               1934                              1935                       1936               1937


Cost of new work _............. ____ .... .                                                                        ...             $498, 000                   $299, 000          -$103. 17
Cost of maintenance_............._........                                                         -- -   -   -   - -    - -       - -   - -    -   -




Total expended_................                    . . .....             --_       .......                                           498, 000                   299, 000           -103. 17
Contributed_..........................._                                 ....------....      I $918,000 ---.........--------.......---                                         -121, 103. 17
                                                                     I                       1                          1                                1                 1




Balance unexpended July 1, 1936_------------        -    -                                                                                                     -____ $121, 000. 00
Deductions on account of revocation of allotment -- _-121,                                                                                                                 103. 17
       Net amount to be accounted for__ -_____--------------                                                                                                                    -- 103. 17
Gross amount expended_____
Less reimbursements collected ----------------------  $103. 17
                                                                                                                                                                                -103.      17
CONSOLIDATED COST AND FINANCIAL                                               SUMMARY                FOR           NEWPORT BAY                                     HARBOR,        CALIF.

Cost of new work to June 30, 1937-------------------------                                                                                                         $1, 593, 793. 66
Cost of maintenance to June 30, 197                                                                                                                                                ._______
       Total cost of permanent work to June 30, 1937----------                                                                                                       1, 593, 793. 66
Net total expenditures_---   __                -____------
                                                        _______
Total amount appropriated and contributed to June 30, 1937-_...
                                                                               ______                                                                                1, 593, 793. 66
                                                                                                                                                                     1, 593, 793. 66
        RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                1409

        Fiscal year ending June 30                1933         1934         1935          1936          1937


Cost of new work-_--------------------_ _          _     ______-------_$958, 910. 86 $634, 882. 80--------
Cost of maintenance-------------------      ---                      ---------------------------------
                                                               .-----------
Total expended---.----------------------------------------              836, 525. 05   754,330. 60     $2,938. 01
Allotted and contributed---.------------------------- $1, 836, 000 ------------          121, 000 -121, 206. 34


Balance unexpended July 1, 1936_________---_--------------__----                                 $124,144.35
Deductions on account of revocation of allotment ---------------                                  121, 206. 34

      Net amount to be accounted for------_---_                    ------------------                2, 938. 01
Gross amount expended ________                                            $3, 144. 35
Less reimbursements collected __----____----                                  206. 34
                                                                                                     2, 938. 01

            3. LOS ANGELES AND LONG BEACH HARBORS, CALIF.

   Location.-These harbors are 410 miles southeast of San Francisco
Harbor and 96 miles northwest of San Diego Harbor. (See U. S.
Coast and Geodetic Survey Chart No. 5147.)
   Previous projects--Los Angeles Harbor.-There was no project for
the outer harbor prior to the existing project. Original project for
the inner harbor was adopted by the River and Harbor Act of March
3, 1871, and modified by the River and Harbor Acts of March 3, 1881,
August 2, 1882, June 3, 1896, June 13, 1902, June 25, 1910, and July
18, 1918. The cost and expenditures on previous projects were $2,-
187,046.59 for new work and $139,347.45 for maintenance, a total of
$2,326,394.04.
   Long Beach Harbor.-There was no previous project.
   For further details see page 1977 of Annual Report for 1915.
   Existing project.-This provides for a breakwater 11,152 feet long
extending easterly from Point Fermin and a detached breakwater
12,500 feet long in prolongation easterly thereof; for an entrance
channel 1,000 feet wide and 40 feet deep to the outer Los Angeles
Harbor, with a turning basin 3,500 feet long and 1,500 feet wide of
the same depth opposite the end of pier 1 and the enlargement of the
entrance to the inner harbor by dredging to a depth of 35 feet, a tri-
angular area at its junction with this turning basin; for an inner
harbor channel 35 feet deep and 1,000 feet wide, with a turning basin
at Los Angeles Harbor 35 feet deep; for a channel 35 feet deep and
650 feet wide in the east basin from the turning basin to United
States station 406; for dredging to a depth of 35 feet and 400 feet
wide in Cerritos Channel from United States station 406 to the Long
Beach turning basin; for a turning basin 35 feet deep at Long Beach;
for an entrance channel to Long Beach Harbor 35 feet deep and 300
to 500 feet wide; for maintenance of the Long Beach breakwater
south of the outer end of pier A; and for the construction of silt-
diversion works for the protection of Los Angeles and Long Beach
Harbors.
   The plane of reference is mean lower low water. The range of
tide between mean lower low water and mean higher high water is
5.5 feet. The extreme range is about 9 feet.
   The estimate of cost for new work, revised in 1935, is $15,600,000,
exclusive of amounts expended on previous projects. The latest
1410    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

 (1930) approved estimates for annual cost of maintenance are
$125,000 for dredging and $50,000 for repairs to the breakwater.
    The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for dredging in Los
Angeles outer harbor west of the entrance channel (Rivers and Har-
bors Committee Doc. No. 8, 62d Cong., 2 sess.); act of August 8,
1917, provided for the silt-diversion works (Rivers and Harbors
Committee Doc. No. 9, 64th Cong., 2d sess.); act of September
22, 1922, provided for a triangular area of approach to Los Angeles
inner harbor entrance channel (H. Doc. No. 1013, 66th Cong., 3d
sess.); act of March 3, 1925, provided for dredging the main-
entrance channel to a depth of 35 feet and width of 1,000 feet, in-
cluding the reclamation of Reservation Point (H. Doc. No. 349, 68th
Cong., 1st sess.) ; act of July 3, 1930, provided for a detached break-
water 12,500 feet long (Rivers and Harbors Committee Doc. No. 33,
71st  Cong., 2d sess.) in prolongation of the existing breakwater (au-
thorized by the act of June 3, 1896) ; for widening the fairway on the
easterly side of the entrance to Los Angeles inner harbor; for dredg-
ing a channel 35 feet deep and 650 feet wide in the east basin from
the turning basin to United States station 406; for dredging to depth
of 35 feet and 400 feet wide in Cerritos Channel from United States
station 406 to the Long Beach turning basin: for a turning basin 35
feet deep at Long Beach; for the entrance channel of Long Beach
Harbor, 35 feet deep and 500 feet wide; and for maintenance of the
Long Beach breakwater south of the outer end of Pier A (S. Doc.
No. 130, 71st Cong., 2d sess.). The River and Harbor Act of July 3,
1930, also provides that in no case shall dredging be done within 50 feet
of established pierhead lines or existing piers and wharves.
   The act of August 30, 1935, provided for dredging the 1,000-foot-
wide entrance channel to Los Angeles outer harbor to a depth of 40
feet and for a turning basin 3,500 feet long and 1,500 feet wide to
the same depth and enlargement of the entrance to the inner harbor
by dredging to 35-foot depth a triangular area at its junction with
the turning basin (Senate committee print, 74th Cong., 1st sess.),
which document contains the latest published map.
   Local cooperation.-The modification of the project, adopted in the
act of August 30, 1935, requires local interests to dredge the east chan-
nel and berths adjacent to pier 1 to a depth of 40 feet when the 40-
foot deep entrance channel to Los Angeles outer harbor and the 40-
foot deep turning basin thereof are dredged. The city completed the
dredging in March 1937.
    Terminal facilities.-In Los Angeles Harbor there is a total of
66,551 linear feet of wharves, of which 44,687 linear feet were con-
structed by the city and 21,864 linear feet by private interests. In
Long Beach Harbor there is a total of 9,878 linear feet of wharves.
The existing terminal facilities are considered adequate. (See Port
Series No. 13, Corps of Engineers, pt. 1.)
    Operations and results during fiscal year--New work.-Operations
with Emergency Relief funds consisted of work under contract on
the third (2,200-foot) section of the detached breakwater in Los
Angeles and Long Beach outer harbors, completed July 3, 1936.
Operations with regular funds consisted of work under continuing
contract from August 10, 1936, on the fourth (4,887-foot) and last
section of the detached breakwater in Los Angeles and Long Beach
        RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                            1411

outer harbors, to be completed on or before November 1938, and
included dredging and placing 545,692 cubic yards of core material,
placing 191,510 solid cubic yards of substructure stone, and 181,180
tons of superstructure stone.
   Dredging in outer Los Angeles Harbor for core material for the
breakwater deepened the entrance channel to project depth of 40 feet
over an average width of 740 feet throughout a length of 4,100 feet
and completed enlargement of the entrance to the inner harbor at
project depth of 35 feet.
   The costs of new work were $1,148,515.97 from regular funds and
$3,592.82 from Emergency Relief funds, a total of $1,152,108.79; ex-
penditures were $994,733.03 from regular funds and $101,163.92 from
Emergency Relief funds, a total of $1,095,896.95.
   Condition at end of fiscal year.-The existing project is 90 percent
completed. The San Pedro breakwater was completed in 1912 and
the silt-diversion works in 1923; 1,711,000 cubic yards have been
dredged from the entrance channel and used for the core of the de-
tached breakwater. All other project dredging is completed, except
for a portion of the 40-foot entrance channel and turning basin in the
outer harbor. The detached breakwater is 76 percent completed, a
length of 3,000 feet of the southwesterly portion remaining to be
done.
   The San Pedro and detached breakwaters are in excellent condi-
tion, and the Long Beach breakwater in fair condition. The en-
trance channel to Long Beach has shoaled considerably along its
sides. Shoaling of the inner channels is negligible.
   The controlling depths were 40 feet for a width of 700 feet in the
entrance channel, 35 feet in the main channel, turning basin, east
basin channel and westerly end of Cerritos Channel, in Los Angeles
Harbor; and 35 feet in the easterly end of Cerritos Channel, 34 feet
in the turning basin, and 34 feet for a width of from 150 to 500 feet
in the entrance channel, in Long Beach Harbor.
   The total costs and expenditures of the existing project were:
                                                                       Costs
                Funds                                                                                      Net expendi-
                                                                                                               tures
                                                 New work          Maintenance            Total


Regular____________________________            $1, 479, 195. 89      $531, 521. 43   $12, 010, 717. 32      $11, 857, 397. 85
Public Works___                                  1, 593, 667. 46   -1,                    593, 667. 46         1, 593, 667. 46
Emergency Relief ...                       _        996, 803. 85                          996, 803. 85            996, 803. 85
     Total all funds_   ____----------          14, 069, 667. 20      531, 521. 43    14, 601, 188. 63       14, 447, 869. 16


  Proposed operations.-The balance unexpended on July 1, 1937,
including accounts receivable, together with an allotment of
$1,400,000 made during July 1937, will be applied as follows:
Accounts payable June 30, 1937_____________________________                                               $153, 319.47
New work:
     Completing construction of the remaining 3,000 feet of the de-
       tached breakwater, being built under continuing contract,
        July 1, 1937, to June 30, 1938______________________________                                     1, 117, 244. 39
    Dredging entrance channel and turning basin to 40-foot depth,
      July 1, 1937, to March 1, 1938 ______          ___________                                           352, 000. 00
Maintenance: Dredging entrance channel to Long Beach Harbor by
Government hopper dredge, January to April 1938-                                                            50, 000. 00
        Total for .all work_          -_           ___---_-_____------___                    _           1, 672, 563. 86
1412             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The operations proposed will complete the project.                                                        No work is pro-
posed during the fiscal year 1939.
                                             Cost and financial summary
                                       MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937---------------------------                                                     $13, 666, 242. 48
Cost of maintenance to June 30, 1937----------------------                                                            670, 868. 88
     Total cost of permanent work to June 30, 1937----------                                                        14, 337, 111. 36
Minus accounts payable June 30, 1937---------------------                                                               153, 319. 47

     Net total expenditures-------------------------------                                                          14, 183, 791. 89
Unexpended balance June 30, 1937------------------------                                                                272, 563. 86
            Total amount appropriated to June 30, 1937------------                                               114, 456, 355. 75

     Fiscal year ending June 30                    1933                 1934              1935               1936               1937


Cost of new work__-------------               $209, 903. 18 $1, 054, 036. 48           $996, 276. 32    -$15, 678. 92      $1, 148, 515. 97
Cost of maintenance-------------..........       3, 153. 61      77, 618. 14
        Total cost       ..---------------      213, 056. 79     1, 131, 654. 62        996, 276. 32     -15, 678. 92       1, 148, 515. 97
Total expended ----------------                 198, 966. 63     1, 078, 532. 23    1, 055, 519. 56         4, 917. 57         994, 733.03

Allotted            .                          644, 300. 64
                               .---------------------            1, 741, 197. 90         29, 057. 45    1, 190, 389.49       -33, 050. 00


Balance unexpended July 1, 1936----------------------------                                                         $1, 300, 346. 89
Deductions on account of revocation of allotment----                                                                     33, 050. 00

      Net amount to be accounted for------------------------                                                         1, 267, 296. 89
Gross amount expended---------------------- $1,244, 813. 95
Less reimbursements collected-_--------------     250, 080. 92
                                                                                                                          994, 733. 03

            Balance unexpended June 30, 1937---------------------                                                        272, 563.86

Outstanding liabilities June 30, 1937----------                                             $60, 710. 88
Amount covered by uncompleted contracts ---                                                 211, 852. 98
                                                                                                                          272, 563. 86

Amount allotted from War Department Civil Appropriations
Act approved July 19, 1937------------------------------                                                            1, 400, 000. 00
Balance available for fiscal year 1938------------------- -                                                          1, 400, 000. 00
  1 Includes $1,593,667.46 Public Works funds, and.includes credit of $33,050 from transfer
of lands at Reservation Point.

                                               EMERGENCY               RELIEF      FUNDS

Cost of new work to June 30, 1937    ____--                                                                              $996, 803. 85
Cost of maintenance to June 30, 1937---------------------

      Total cost of permanent work to June 30, 1937--                                                                    996, 803. 85
Net total expenditures----------                    --------                                                             996, 803. 85
Total amount appropriated to June 30, 1937                                                                                     803. 85
                                                                                                                         9------------------
                                                                                                                         99,

            Fiscal year ending June 30                          1933            1934             1935            1936             1937


Cost of new work.............----------------.....--...-- ----...-------                993, 211.03
                                                                                   .------------....... $3, 592. 82
Cost of maintenance             -----         -------------       --------------------------------------
Total expended- -                           ........--
                                           ....
                                   .............                                                 -           895, 639.93       101, 163. 92
Allotted_ ___ -           - --......
                              ...                   .
                                             .........    ...           .-                       000, 000      -810. 47        -2, 385. 68
                                                                                                                               1-$1,
         RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                                1413
Balance unexpended July 1, 1936--..........                      $103, 549. 60
Deductions on account of revocation of allotment----------------    2, 385. 68

      Net amount to be accounted for----______----------                                                          101, 163.92
Gross amount expended----------------------------$101,                                            300. 92
Less reimbursements collected-------------- ------                                                137. 00
                                                                                                                  101, 163. 92

CONSOLIDATED          COST AND FINANCIAL SUMMARY FOR LOS ANGELES-LONG                                       BEACH HARBOR,
                                                             CALIF.

Cost of new work to June 30, 1937--------------------------  $16, 256, 713. 79
Cost of maintenance to June 30, 1937------          _______---670, 868. 88
     Total cost of permanent work to June 30, 1937                                   ----------              16, 927, 582. 67
Minus accounts payable June 30, 1937___________________                                                          153, 319. 47

     Net total expenditures-__-- -   __-___----- -      -___                                             '16,     774, 263. 20
Unexpended balance June 30, 1937_______.           ____      -_____                                               272, 563. 86
           Total amount appropriated to June 30, 1937____________                                           17, 046, 827. 06

    Fiscal year ending June 30                  1933              1934             1935              1936              1937

Cost of new work .-....-------               $209, 903. 18 $1, 054, 036. 48 $996, 276. 32        $977, 532. 11     $1, 152, 108. 79
Cost of maintenance ......-------------         3, 153. 61      77, 618. 14 ..
       Total cost_----------------            213, 056. 79   1, 131, 654. 62     996, 276. 32     977, 532. 11      1, 152, 108. 79
Total expended............----------------    198, 966. 63   1, 078, 532. 23   1,055, 519. 56     900, 557. 50      1, 095, 896. 95
Allotted_-- ----------.-------                644, 300. 64   1, 741, 197. 90   1,037, 000. 00   1, 189, 579. 02      -35, 435. 68


Balance unexpended July 1, 1936---------------------------                                                   $1, 403, 896.49
Deductions on account of revocation of allotment ----------------                                                  35, 435. 68
      Net amount to be accounted for__                                ___________--     ___ _                  1,368, 460. 81
Gross amount expended__
                      -      -----
                              ______-----                                      $1, 346,114. 87
Less reimbursements collected___- ___--                                 ____       250, 217. 92
                                                                                                              1, 095, 896. 95
      Balance unexpended June 30, 1937-----------------------                                                     272, 563.86
Outstanding liabilities June 30, 1937___-- -_____.  $60, 710. 88
Amount covered by uncompleted contracts --------    211, 852. 98
                                                                                                                  272, 563. 86
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937-------------------------------------1, 400, 000. 00
Balance available for fiscal year 1938_------___-_-  _____ ____ 1, 400, 000. 00
1Includes $1,593,667.46 Public Works funds and credit of $33,050 from transfer of
lands at Reservation Point.

                               4. SANTA BARBARA HARBOR, CALIF.

   Location.-This harbor is 90 miles northwest of Los Angeles Har-
bor and 320 miles southeast of San Francisco Harbor. (See United
States Coast and Geodetic Survey Chart No. 5261.)
   Existing project.-This provides for maintenance by dredging of
the present depths into the harbor formed by the breakwater con-
structed by local interests. All depths refer to mean lower low water.
1414            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

The range of tide between mean lower low water and mean higher
high water is 5.4 feet. The extreme range is about 10.5 feet. The
latest (1934) approved estimate for annual cost of maintenance is
$30,000.
    The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Senate committee print, 73d Cong., 2d sess.). Prior
to adoption by Congress, the work was authorized by the Public
Works Administration.
    Local cooperation.-Local interests constructed, at a cost of about
$750,000, the rubble-mound breakwater about 2,800 feet long, which
forms the harbor.
    Terminal facilities.-There is one wharf 2,200 feet long, with ware-
house used for general cargo and by fishing boats; also a landing
float and mooring facilities for small craft.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-All previous work has been done
by local interests, which includes the construction and maintenance
of a breakwater 2,800 feet long. The original depths along both sea-
ward and harbor sides of the breakwater were partially restored by
the dredging in 1935, but there has been considerable further shoal-
ing. The controlling depth in the entrance is 18 feet for a width of
250 feet.
    The costs of maintenance to date are $29,198.39 from Public Works
funds and $4 from regular funds, a total of $29,202.39, which was the
amount expended.
    Proposedoperations.-An allotment made during July 1937 includ-
ing $50,000 to be contributed, amounting to $115,000, will be applied
to maintenance during January, February, and March, 1938, for
triennial advance dredging.
    No work is proposed during the fiscal year 1939.
                                                 Cost and financial summary
Cost of new work to June 30, 1937_________
Cost of maintenance to June 30, 1937-------- __--------------                                                            1   $29, 202. 39
      Total cost of permanent work to June 30, 1937------- _---                                                               29, 202. 39
Net total expenditures____________________________                                                                            29, 202. 39
Total amount appropriated to June 30, 1937 ________29,                                                                            202. 39

          Fiscal year ending June 30                                1933            1934           1935           1936              1937

Cost of new work ..............                                .I---                       ------------                        --
Cost of maintenance--                    _-__-         -- _     -
                                                              _____________
                                                              ______                            ____________   $29, 198. 39                $4
Total expended-        -      -          ---     ---                       ___________
                                                                           __                 --                29, 198. 39                 4
Allotted.    _--       ---        ----                         -     -     --   -   -              $30, 000     35, 198. 39         -35, 996


Balance unexpended July 1, 1936 _ _____________________________                                                              $36, 000. 00
Deductions on account of revocation of allotment----- -----                                                                   35, 996. 00

            Net amount to be accounted for ___                                      _______------                                     4. 00
Gross amount expended _______________________-_________-_--_                                                                          4. 00
    1 Includes $29,198.39 Public Works funds.
      RIVERS AND HARBORS-LOS             ANGELES, CALIF., DISTRICT            1415
Amount allotted from War Department Civil Appropriation Act,
  approved July 19, 1937------------------------------------        $65, 000.00
Balance available for fiscal year 1938----------------------- -----   5, 000.00

                   5. SAN LUIS OBISPO HARBOR, CALIF.

   Location.-This harbor is 9 miles south of the city of San Luis
Obispo, 190 miles northwest of Los Angeles Harbor, and 220 miles
southeast of San Francisco Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 5386.)
   Existing project.--This provides for the construction on Whaler
Reef of a rubble-mound breakwater 6 feet above mean high water
with a top width of 20 feet, extending from Point San Luis to
Whaler Island, a distance of 336 feet, and southeasterly from the
island a distance of 1,820 feet, giving a total distance, including the
island, of 2,401 feet. The range of tide between mean lower low
water and mean higher high water is 5.2 feet. The extreme range is
about 9 feet. The estimate of cost for new work, revised in 1893,
was $568,660. The latest (1928) approved estimate for annual cost
of maintenance is $1,500.
   The existing project was adopted by the River and Harbor Act of
August 11, 1888 (S. Doc. 81, 49th Cong., 2d sess.). Enlarged di-
mensions were authorized under date of January 17, 1893 (Annual
Report for 1893, p. 3226). In 1898 the line of the breakwater was
deflected about 11° toward the harbor (Annual Report for 1898,
p. 2933).
  Terminal facilities.-There are three wharves, with total berthing
frontage of 2,734 feet, which provide adequate facilities. (See Port
Series No. 13, pt. 2, Corps of Engineers.)
   Operations and results during fiscal year.-None. The sum of
$3,042.86 was expended from regular funds in settlement of a con-
tractor's claim.   The cost was $3,330.99.
   Condition at end of fiscal year.-The breakwater was completed in
1913. The minimum usable depths in the protected area of the
harbor are practically stable, varying from 20 to 33 feet. The struc-
ture, which was repaired in 1935, is in good condition. The total
cost of the existing project was $568,417.13 for new work and
$54,715.08 for maintenance, a total of $623,132.21, which was the
amount expended.
  Proposed operations.-No work is proposed during the fiscal years
1938 and 1939.
                          Cost and financial summary

Cost of new work to June 30, 1937-------------------- -------          $568, 417. 13
Cost of maintenance to June 30, 1937----------------------_      ___     54, 715.08
      Total cost of permanent work to June 30, 1937--------------    623, 132. 21
      Net total expenditures_6-----------------------------------23,      132. 21
      Total amount appropriated to June 30, 1937----------------     623, 132. 21
1416           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


           Fiscal year ending June 30                 1933           1934             1935           1936               1937

Cost of new work---. -- --------
                                   _. ..---------...-
Cost of maintenance-__--_----------_------------                                                  $31, 669. 01         3,330.99
Total expended----..............------------------------ -----------------------                   31, 957. 14        $3, 042.86
Allotted---.---                                 ------------ ------------
                                .------------------------                            $50, 000 -15,000.00----------


Balance unexpended July 1, 1936 -- __---------                                                                   $3, 042. 86
Gross amount expended------------------------------------                                                         3, 042, 86

     6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                    (GENERAL)

   The cost of work during the year amounted to $72,2110.53; the ex-
penditures were $71,929.33. The balance unexpended July 1, 1937,
including accounts receivable and an allotment of $40,000 made during
July 1937, a total of $47,949.64, will be applied as needed during the
fiscal year 1938 to payment of expenses incurred under this heading.
The sum of $50,000 can be profitably expended during the fiscal year
1939.
                                        Cost and financial summary
Cost of new work to June 30, 1937__    ___________________
Cost of maintenance to June 30, 1937__                                                                        $172, 761. 96
      Total cost of permanent work to June 30, 1937 ____________ 172, 761. 96
Undistributed costs June 30, 1937 __     ________      ___-____427.        31
      Net total cost to June 30, 1937---------___    ______________                                              173, 189. 27
Plus accounts receivable June 30, 1937___________________________                                                      44. 53
     Gross total costs to June 30, 1937---------- _______      173, 233. 80
Minus accounts payable June 30, 1937---------------------------1, 639. 28
     Net total expenditures --------------------------------                                                     171, 594. 52
Unexpended balance June 30, 1937________________ -_________                                                        7,905. 11
           Total amount appropriated to June 30, 1937________________                                            179, 499. 63

           Fiscal year ending June 30                 1933           1934             1935            1936              1937


                 -------------------------
Cost of new work-...........            ...    .    .                 .            - -.              .------------
                                                                                                        ..- -          --      --..
Cost of maintenance........------------------- $8,871. 47          $9,982. 07      $11, 478. 10   $33, 019. 79        $72, 210. 53
Total expended--...................                 8, 871. 47
                                                   -...             9, 978. 64      11, 190. 43    32, 424. 65         71, 929. 33
Allotted    .---__-----   ...             .
                                __.....____.... 20, 704.96         19, 594. 67      20,000. 00     32, 000. 00         50, 000. 00


Balance unexpended July 1, 1936 _____ --- __---__ ___---    ___-$29, 834. 44
Amount allotted from War Department Appropriation Act approved
May 15, 1936 __.---     --------------------------------        50, 000. 00
      Amount to be accounted for __________------______---79, 834. 44
Gross amount expended__________________________ $73, 325. 10
Less reimbursements collected___          ____-      395. 77
                                                  1_________
                                                             71, 929. 33
                                                                                             1,
      Balance unexpended June 30, 1937 ___         _____    _-____-                                                  7, 905. 11
                                                  -
Outstanding liabilities June 30, 1937 __---_____----    -----------                                                  3, 183. 99
           Balance available June 30, 1937-......                                                                    4, 721. 12
Accounts receivable June 30, 1937.....                                                                                      44. 53
           Unobligated balance available June 30, 1937----------------                                               4, 765.65
      RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                    1417
Amount allotted from War Department Civil Appropriation Act, ap-
proved July 19, 1937-----------------------------------------$40, 000.00

      Balance available for fiscal year 1938_----------------------   44, 765. 65

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1___------             ---------           50, 000.00
1 Exclusive of available funds.

7.LOS ANGELES COUNTY FLOOD CONTROL AND WATER CONSERVA-
                                  TION, CALIF.
   Location.-The works covered by this project are in Los Angeles
metropolitan area on Los Angeles River and tributaries, and on trib-
utaries of the San Gabriel River and Rio Hondo, on Kenter Canyon
and Ballona Creeks, and include a drainage system near Long Beach.
The works extend from the San Gabriel and the Santa Monica Moun-
tains through the coastal plain to the Pacific Ocean.
   Existing project.-Under provisions of the Emergency Relief Ap-
propriation Act of 1935, the President approved on July 10, 1935, an
allotment for unemployment relief amounting to $13,869,000 for
construction of 14 flood-control units.
   On December 24, 1935, $4,000,000 of the original allotment was
revoked. The project was reduced to 10 units for flood control and
drainage. These units are located in various highly developed com-
munities and the work consists of construction of debris basins, con-
crete channels and conduits, bank protection, levees, alterations to
bridges, rolled filled dam and drainage sump, with pumping equip-
ment.
   Additional funds amounting to $3,135,000 from the Emergency
Relief Appropriation Act of 1935, and $3,910,000 from the Emergency
Relief Appropriation Act of 1936, have since been allotted to the
project. Under provisions of these allotments, two of the four units
eliminated by the revocation of December 24, 1935, were restored to
the project, and two units were combined, making a total of 11 units
in the revised project. Items of the project upon which work remains
to be done will be transferred to the project, "Los Angeles County
drainage area, California-Flood control", for completion.
   Local cooperation.-The Los Angeles County flood-control district
is required to contribute $3,500,000 toward the cost of the work, fur-
nish free of cost to the United States all rights-of-way and easements,
maintain and operate the works after completion, and hold and save
the United States harmless from all claims for damages arising from
the construction, maintenance, and operation of the project. The full
$3,500,000 has been contributed, and in addition, the Los Angeles
County flood-control district made voluntary contributions of
$348,000 toward the construction of Eaton Dam and $390,000 toward
the construction of bridges. All of the rights-of-way necessary for
prosecution of work have been provided. Completed units have been
officially accepted by the Los Angeles County flood-control district
for maintenance and operation.
   Operations and results during fiscal year-New   vwork.-Operations
with Emergency Relief and contributed funds by hired labor con-
sisted of surveys, clearing of rights-of-way, preparation of plans and
specifications, and construction work on 11 separate units of the
project, including reinforced-concrete channels and reinforced-
1418         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

concrete and brick conduits, earth channels, debris basins, dam and
levee embankments, bank protection, alteration and construction of
bridges, and minor miscellaneous structures. Work performed in-
cluded the following quantities: Excavation, 3,782,491 cubic yards;
reinforced concrete, 188,655 cubic yards; structural steel in bridges,
7,681,300 pounds; backfill, 1,143,147 cubic yards; dam and levee em-
bankment, 958,254 cubic yards; bank protection (stone), 458,874 tons;
and brick, 3,912,000.
   The cost of new work was $8,637,729.05 from Emergency Relief
funds and $2,258,058.21 from contributed funds, a total of $10,895,-
787.26; expenditures were $7,912,764.45 from Emergency Relief funds
and $2,258,058.21 from contributed funds, a total of $10,170,822.66.
   Condition at end of fiscal year.-The following separate units have
been completed: Long Beach northeast drainage system, Rubio
Wash, Eaton Wash Dam, and Kenter Canyon storm drain.
   The status of partially completed project units is as follows:
                                                                                           Percent
                                                                                         comepleted
Los Angeles River (channel improvement) -------------------------------                         41
Compton Creek -------------------------------------------------------                           55
Ballona      Creek     -----          ---------------                                            67
Arroyo des los Jardines -------------------------------                                        37
Sycamore and Verdugo Washes----------------------                       --         ---         60
Alhambra Wash                  -----------------------                                   ----- 52
La   Crescenta-----                                                                              71

  The total cost of new work was $15,213.849.03 from Emergency
Relief funds and $3,836,135.61 from contributed funds, a total of
$19.049,984.64. Expenditures were $16,469,510.91 from Emergency
Rslief funds and $3,836,135.61 from contributed funds, a total of
$20,305,646.52.
  Proposed operations.-The balance unexpended from Emergency
Relief and contributed funds, including accounts receivable, amount-
ing to $853,914.87, will be applied as follows:
Accounts payable June 30, 1937________-_____________________ $166, 702. 60
New work: Continuation of construction by hired labor on the
Ballona Creek, Compton Creek, and Arroyo de los Jardines units
of the project, July 1 to Dec. 31, 1937 ______________________ 687, 212. 27
         Total__-------- ------------------------------------------               853, 914. 87

                               Cost and financial summary
                                EMERGENCY        RELIEF FUNDS

Cost of new work to June 30, 1937  __                   ----------            $15, 213, 849. 03
Cost of maintenance to June 30, 1937

     Total cost of permanent work to June 30, 1937________                     15, 213, 849. 03
Undistributed costs June 30, 1937___ _________-___________                      1, 415, 803. 09
      Net total cost to June 30, 1937 ______-- -    ___          16, 629, 652. 12
                                                             -_____
Plus accounts receivable June 30, 1937________________________         6, 561. 39

      Gross total costs to June 30, 1937__                  ___-__________     16, 636, 213. 51
Minus accounts payable June 30, 1937_____                   ___-_____--____        166, 702.60
                           .....
     Net total expenditures---         ------.                                 16, 469, 510. 91
Unexpended balance June 30, 1937------------___                                    444, 489. 09
         Total amount appropriated to June 30, 1937------                      16, 914, 000. 00
          RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                                                1419

   Fiscal year ending June 30                       1933                      1934           1935                1936                   1937


Cost of new work-------              ......----------- ------------- --------------  $6, 576, 119. 98                              $8, 637, 729. 05
Cost of maintenance              --- -------------- -------------- -------------- ----------------                                 --------------

Total expended .____________-___                    -__-_._........--..--..                                  8, 556, 746. 46        7, 912, 764. 45

Allotted_--------------              ----------------                                               --      10, 269, 000. 00        6, 645, 000. 00


Balance unexpended July 1, 1936----------------------------                                                              $1, 712, 253. 54
Amount allotted from War Department Appropri-
ation Act approved Apr. 8, 1935__
                                -------------  $2, 775, 000. 00
Amount allotted from Emergency Relief Act
approved June 22, 1936----------------------   3, 910, 000. 00
                                                                                                                              _ _ _, . . . . 00
                                                                                                                          6,, 685.000.        . .


     Amount to be accounted for___                                                                                        8, 397, 253. 54
Deductions on account of revocation of allotment_                                                                                  40, 000. 00

      Net amount to be accounted for__                                                                                    8, 357, 253. 54
Gross amount expended ____________________                                                    $8, 106,881.39
Less reimbursements collected -----------------                                                   194, 116. 94
                                                                                                                   -      7, 912, 764.45

      Balance unexpended June 30, 1937--------_____- __                                                                        444, 489. 09
Outstanding liabilities June 30, 1937_______________________                                                                   444, 489. 09
Accounts receivable June 30, 1937__________________________                                                                          6, 561.39
Unobligated balance available June 30, 1937---______________                                                                         6, 561.39

                                                           CONTRIBUTED               FUNDS


Cost of new work to June 30, 1937___                                                                                     $3, 836, 135. 61
Cost of maintenance to June 30, 1937-------------------

           Total cost of permanent work to June 30, 1937__________                                                        3, 836, 135. 61
Net total expenditures _______     ___________________                                                                    3, 836, 135. 61
Unexpended balance June 30, 1937___________________________                                                                  401, 864. 39
           Total amount contributed to June 30, 1937_____________                                                         4, 238, 000. 00

   Fiscal year ending June 30                      1933                   1934               1935               1936                    1937


Cost of new work ----     -   ----                                                   -                      $1, 578, 077. 40       $2, 258, 058. 21
Cost of maintenance                   , --
                                                                                                         . ...
                                                                                                           . .. .            l, J
Total expended----------------                                                                                 1, 578,077.40   2, 258, 058. 21
                                                                 I                   -I-----------I                            I
Contributed--.---------------                                                                                2, 700,000.
                                                                                                                     00             1, 538, 000. 00


Balance unexpended July 1, 1936 ------------------------                                                       _        $1, 121, 922. 60
Amount contributed __________________________                                                                _1,            538, 000. 00
      Amount to be accounted for___                                                                                       2, 659, 922. 60
Gross amount expended____________________------_   $2, 266, 522. 71
Less reimbursements collected -__________        _          464. 50
                                                         S---8,
                                                                                                                          2, 258, 058. 21
      Balance unexpended June 30, 1937--______________-                                                                        401, 864.39
Outstanding liabilities June 30, 1937_____________ __________                                                                  185, 287. 57
          Balance available June 30, 1937
                                        ------                                           ______________--                      216, 576. 82
1420            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

CONSOLIDATED           COST      AND        FINANCIAL SUMMARY     FOR LOS                     ANGELES       COUNTY         FLOOD
                                                    CONTROL, ETC.

Cost of new work to June 30, 1937---                                                                     _ $19, 049, 984. 64
Cost of maintenance to June 30, 1937____________________

          Total cost of permanent work to June 30, 1937                                                      19, 049, 984.64
Undistributed costs June 30, 1937-------------------                                          ---             1, 415, 803. 09
      Net total cost to June 30, 1937_                                                                      20, 465, 787. 73
Plus accounts receivable June 30, 1937___                                                                         6, 561. 39

      Gross total costs to June 30, 1937     ---                                                            20, 472, 349. 12
Minus accounts payable June 30, 1937_________________                                                           166, 702. 60

      Net total expenditures___________                                                                      20, 305, 640. 52
U'nexpended balance June 30, 1937 ___-____                                                                         846, 353. 48

          Total amount appropriated and contributed to June 30
            1937     --  -----     _
                                 --------------------                                                        21, 152, 000. 00

  Fiscal year ending June 30                1933                1934           1935               1936                 1937


                  ..
Cost of new work ___..________  --            ______                                          $8, 154, 197. 38     $10,895,787.26
Cost of maintenance        ---------               ----------             -------------- --            -                ---------

Total expended                     -. .
                      -__-__........         .     .        .______-                   .       10,134,823.86        10, 170, 822. 66

Allotted and contributed--...._____....--               ...______ ........         -__        12,969, 000.00         8,183,000.00


Balance unexpended July 1, 1936                                 - ____-                       _      _       $2, 834, 176. 14
Amount allotted from War Department Appropri-
ation Act approved Apr. 8, 1935----               775, 000. 00
                                               $----------2,
Amount allotted from Emergency Relief Act ap-
proved June 22, 1936                           3, 910, 000. 00
Amount contributed-----------------------------1, 538, 000. 00
                                                                                                                 8, 223, 000. 00
     Amount to be accounted for-__ __________--------11, 057, 176. 14
Deductions on account of revocation of allotment ______------40, 000. 00

                                                - --
       Net amount to be accounted for___ - - ________       -______11, 017, 176. 14
Gross amount expended______________________     $10, 373, 404. 10
Less reimbursements collected_--_-- ----- ____-  - 202, 581. 44
                                                                   10, 170, 822. 66
      Balance unexpended June 30, 1937 ------          __________                                                  846, 353. 48
Outstanding liabilities June 30, 1937----------------- -------- _                                                  629, 776. 66

      Balance available June 30, 1937----         ___-__________                                                   216, 576. 82
Accounts receivable June 30, 1937_        -------------------------                                                  6_,561. 39

           Unobligated balance available June 30, 1937______________                                               223, 138. 21

8. LOS ANGELES COUNTY DRAINAGE AREA, CALIF.-FLOOD CONTROL

   Location.-The works covered by this project are located along the
Ios Angeles and San Gabriel Rivers and Ballona Creek and tribu-
taries thereof in Los Angeles County drainage area, Calif. (See
preceding project 7.)
   Existing project.--This provides for the construction of reservoirs
and principal flood channels in Los Angeles and San Gabriel Rivers
and Ballona Creek and tributaries thereof, in accordance with plans
to be approved by the Chief of Engineers on recommendation of the
Board of Engineers for Rivers and Harbors at an estimated construc-
     RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                            1421
tion cost not to exceed $70,000,000; estimated cost of lands and dam-
ages, $5,000,000, the latter to be contributed by local interests. The
purpose of the improvement is control of destructive floodwaters for
the protection principally of Los Angeles metropolitan area. (See
preceding report.)
   The project was authorized by the Flood Control Act of June 22
1936, under the heading "Los Angeles and San Gabriel Rivers, Calif. ' ,
and was amended by the act of May 15, 1937 (Public, No. 86, 75th
Cong.), under the heading "Los Angeles County Drainage Area, Calif."
   Local cooperation.-Local interests are required to, provide lands
necessary for the construction of the project and assume all damages
at an estimated cost of $5,000,000. (See preceding report.)
  Operations and results during fiscal year.-Engineeringplans and
investigation, preparatory to execution of work during the next
fiscal year, were completed for two reservoirs and parts of channels
on the Los Angeles River with funds provided by Executive order
for "Assistance for educational, professional, and clerical persons."
   Condition at end of fiscal year.--Work has not been started under
this authorization; however, a large amount of work has been done
by the United States with relief funds and funds contributed by
local interests. (See preceding report.) Plans and specifications
for new work comprising about 20 percent of the project, including
Hansen and Van Nuys Reservoirs, and channel improvements for
the Los Angeles River and tributaries, are completed.
   Proposed operations.--Allotments of $5,000,000 from regular funds
and $6,478,000 from Emergency Relief funds made during August
1937, will be applied as follows:
New work: Completion of project units included in the Los Angeles
County flood control and water conservation project, upon which
work has been started with emergency funds, and construc-
  tion of retarding basins and channel improvement by contract
  and by hired labor, July 1, 1937, to June 30, 1938____________ $11, 478, 000

  The additional sum of $15,000,000 can be profitably expended dur-
ing the fiscal year 1939, as follows:
New work; Construction of retarding basins and channel improve-
ment by contract and by hired labor July 1, 1938, to June
30, 1939 ---------------------------------------------------   $15, 000, 000
                            Cost and financial summary
Cost of new work to June 30, 1937          ________________
Cost of maintenance to June 30, 1937____________________  _____
      Net total expenditures_
Total amount appropriated to June 30, 1937_
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937           _ __         _        _ _-------------   $5, 000, 000
Amount allotted' from Emergency Relief Appropriation Act ap-
  proved June 29, 1937_ ___.. --          _---------                         6,478, 000

      Amount available for fiscal year 1938___________________              11, 478, 000

Amount (estimated) required to be appropriated for completion of
existing project 1 -- --             -_____                                58, 522, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work 1-- ---------------                    __-          15, 000, 000
  SExclusive of available funds.
 1422         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                   9. SANTA ANA RIVER, CALIF.--FLOOD CONTROL

   Location.-The works covered by this project are located on the
Santa Ana River and tributaries and other streams in Orange County
near Santa Ana, Calif., about 30 miles southeasterly from Los
Angeles.
   Existing project.-This was authorized by the Flood Control Act
of June 22, 1936, and provides for the construction of reservoirs and
related flood-control works for protection of the metropolitan area in
Orange County, Calif., at an estimated construction cost not to ex-
ceed $13,000,000, with an additional estimated cost of lands and
damages of $3,500,000, the latter to be contributed by local interests.
   Local cooperation.-See page 6. Local interests are required to
provide lands necessary for the construction of the project, and
assume all damages, at an estimated cost of $3.500,000.
   Operations and results during fiscal year.-Engineering plans and
investigations preparatory to initiating work under the project were
accomplished with funds provided by Executive order for "Assistance
for educational, professional, and clerical persons."
   Condition at end of fiscal year.--Plans and specifications are com-
pleted for Prado Retarding Reservoir. No work has been done under
the project authorization.
  Proposed operations.-An allotment of $250,000 made during
August 1937 will be applied to investigation, borings, surveys, and
design of the Prado Retarding Dam, one of the flood-control items
of the project.
  The additional sum of $3,700,000 can be profitably expended during
the fiscal year 1939, to be applied to construction of Prado Retarding
Dam, one of the flood-control improvements for the protection of
the metropolitan area of Orange County, by contract and by hired
labor.
                                    Cost and financial summary
Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937                          _
Net total expenditures-------________
Total amount appropriated to June 30, 1937_____________
Amount allotted during fiscal year 1938_     ______________      _                             $250, 000
Amount available for fiscal year 1938__------ ------ _____  ______                              250, 000
Amount (estimated) required to be appropriated for completion of
                                                       _                       _
   existing project 1-___________________
                       ----             --                             ___                  12, 750, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work ---------------------------------------                              3, 700, 000
   1 Exclusive of available funds.

Status of reports called for by rivers and harbor acts and committee resolutions

                                                       Transmitted
                                                       to Congress           Document no.   Recommenda-
                                                                                                tion
        Locality              Authorization act


Alamitos Bay, Calif .._--                                                 _
                            River and Harbor Act, Dec. 12, 1936 ----------------------      Unfavorable.
                             July 3, 1930.
Alamitos Bay, Los An-       River and Harbor Act, ___       ___ __
geles County, Calif.         Aug. 26, 1937.
Green River, at or near     River and Harbor Act,       ..................
Green River, Utah,          Aug. 30, 1935.
shore (bank) erosion.
Hueneme Harbor, Calif.      River and Harbor Act,---------------
                             Jan. 21, 1927.
      RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT                                              1423
      Status of reports called for by rivers and harbor acts and committee
                              rosolutions-Continued

        Locality           Authorization act          Transmitted       Document no.         Recommenda-
                                                      to Congress                                fion
                                                 i
                       i



Los Angeles and San Ga- Flood Control Act,
  briel Rivers and tribu-    Mar. 6, 1936.
  taries, California (pre-
  liminary examination
  for flood control).
Morro Bay, Calif .__       Rivers and Harbors
                             Committee resolu-
                             tion, Apr. 28, 1936.
Newport Bay, Calif ____ Senate committee res- Nov. 17, 1936         Senate committee         Favorable.
                             olution, Sept. 20,                     print, 75th Cong., 1st
                             1935.                                    sess.
Newport Bay (Upper),       River and Harbor Act,
  Calif.                     Aug. 26, 1937.
Playa del Rey Inlet and    Senate committee res-
  Basin, Venice, Calif.      olution, June 2, 1936.
Playa del Rey, Calif., River and Harbor Act,
  harbor.                    Aug. 26, 1937.
Redondo Beach Harbor, River and Harbor Act, July 14, 1937                                    Unfavorable.
  Calif.                     Aug. 30, 1935.
San Diego River and        Flood Control Act, --- --- --- --
  tributaries, California    May 6, 1936.
  (preliminary     exam-
  ination for flood   con-
  trol).
Santa Maria River and      Flood Control Act, I-
  tributaries, California    May 14, 1937.
  (preliminary     exam-
  ination and survey).
Santa Monica Harbor,       Senate committee res- Mar. 18, 1937                                  Do.
  Calif.                     olution, June 14,
                             1934.
     Do_--__               River and Harbor Act,    do-.....
                                                       _                                        Do.
                             Aug. 30, 1935.
Ventura Harbor, Calif_     Senate Committee res-
                             olution, Feb. 1, 1934.



IMPROVEMENT OF RIVERS AND HARBORS IN THE SAN
         FRANCISCO, CALIF., DISTRICT
  This district comprises all the waterways and their tributaries
along the Pacific coast from Cape San Martin, Calif. (about 150
miles south of the entrance to San Francisco Bay), on the south, to
the Oregon State line on the north, except the waters of Suisun Bay
and the Sacramento and San Joaquin Rivers and their tributaries.
  District engineer: Lt. Col. J. A. Dorst, Corps of Engineers.
   Division engineer: Col. T. H. Jackson, Corps of Engineers, to
August 30, 1936, Col. John J. Kingman, Corps of Engineers, since
that date.
                                          IMPROVEMENTS

                                               Page                                                   Page
1.   San Francisco Harbor, Calif__             1424 10. Humboldt Harbor and Bay,
2.   Redwood Creek, Calif_ --                  1426       Calif _----                                 1443
3.   Oakland Harbor, Calif_ .....              1430 11. Crescent City Harbor, Calif_                  1445
4.   Richmond Harbor, Calif ....               1433 12. Examinations, surveys, and
5.   San Pablo Bay and Mare
       Island Strait, Calif .......
                                                          contingencies (general)__
                                               1435 13. Other projects for which no
                                                                                             ---      1447
6.   Napa River, Calif___                      1437       estimates are submitted                     1448
7.   Petaluma Creek, Calif . ---               1439 14. Plant allotment _-__                          1448
8.   San Rafael Creek, Calif ......            1440 15. Eel River, Calif.      Flood
9.   Noyo River, Calif-____                    1441       control- ----      _-                       1449



        20196-37-pt. 1---90
1424    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                1. SAN FRANCISCO HARBOR, CALIF.

   ,Location.-The works included under this project are in San
Francisco Bay, in the vicinity of San Francisco, and in the approach
channels to the Golden Gate, the bay entrance. (See U. S. Coast and
Geodetic Survey Chart No. 5532.)
   Previous projects.--Adopted by the River and Harbor Acts of July
25, 1868, June 10, 1872, June 23, 1874, March 3, 1899, June 13, 1902,
June 25, 1910, and September 22, 1922. The total cost was $1,505,-
719.94, of which $1,030,398.99 was for new work and $475,320.95 for
maintenance. The total expenditures were $2,631,562.34. For fur-
ther details see page 1978 of Annual Report for 1915, page 1749 of
Annual Report for 1921, and page 1633 of Annual Report for 1929.
   Existing project.-This provides for dredging a channel through
the San Francisco Bar on the line of the main ship channel, 50 feet
deep and 2,000 feet wide; the removal of Presidio Shoal, Black Point
Shoal, Rincon Reef Rock (inner), Rincon Reef Rock (outer), Blos-
som Rock, and Alcatraz Shoal, westward of a north-and-south line
2,500 feet west of Alcatraz Light, to a depth of 40 feet; the removal
of Arch Rock, Shag Rocks nos. 1 and 2, Harding Rock, Raccoon
Shoal, and Point Knox Shoal, westward of a north-and-south line
through Point Stuart Light, a portion of the shoal channelward of
the pierhead line near the mouth of Islais Creek to a depth of 35
feet, and for dredging a channel 750 feet wide and 10 feet deep from
that depth in the bay to San Francisco Airport ending in a basin 10
feet deep and approximately 2,000 feet in width.
   All depths refer to mean lower low water. The tidal range be-
tween mean lower low water and mean higher high water is 5.7 feet,
with an extreme range of 10.5 feet.
   The estimate of cost for new work revised in 1937 is $2,053,600,
exclusive of amounts expended on previous projects and exclusive of
$137,000 to be contributed by local interests. The latest (1937)
approved estimate for annual cost of maintenance is $237,000.
   The existing project was adopted by the following river and har-
bor acts: The act of January 21, 1927 (H. Doc. No. 337, 69th Cong.,
1st sess.), provided for the dredging at Islais Creek; the act of
July 3, 1930 (H. Doc. No. 196, 70th Cong., 1st sess.), provided for
the remainder of the project, except that the act of August 30, 1935,
authorized the 50-foot depth in the bar channel, the removal of
Black Point Shoal and certain modifications of the areas to be deep-
ened on Alcatraz and Islais Creek Shoals, and abandonment of the
34-foot depth area south of the flared approach channel to Islais
Creek (Rivers and Harbors Committee Doc. No. 50, 72d Cong., 2d
sess.), and the act of August 26, 1937, authorized the channel to
the San Francisco Airport (Rivers and Harbors Committee Doc. No.
12, 75th Cong., 1st sess.). Prior to adoption by the River and Harbor
Act of 1935, the Public Works Administration, September 6, 1933,
authorized the 50-foot depth in the bar channel, and removal of
Black Point Shoal to 40 feet. The latest published maps are in the
last two described documents.
   Local cooperation.-The act of August 26, 1937, requires that local
interests contribute one-half the initial cost of the channel to San
Francisco Airport, construct suitable works for the protection of the
   RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT            1425
harbor at that point, furnish free of cost to the United States, neces-
sary rights-of-way and suitable bulkheaded spoil-disposal areas for
new work and for subsequent maintenance as required, and an area
400 to 660 feet in width and up to 1,250 feet in length, with a front-
age on the proposed seaplane harbor of not less than 860 feet, and
having satisfactory access by land to the public highway system and
to the runways of the airport landing field. It is expected that the
requirements will be fulfilled.
    Terminal facilities.-The State has 43 piers, 15 passenger- and
automobile-ferry slips, 5 car-ferry slips, a large union passenger
depot, some 5 miles of bulkhead wharves parallel to the sea wall,
providing an aggregate of 17.2 miles of berthing space. The exist-
ing facilities are considered adequate. (See Port Series No. 12,
Corps of Engineers.)
    Operations and results during fiscal year.-As new work, the
United States hopper dredge San Pablo removed 161,801 cubic yards
from Black Point Shoal, thus practically completing that portion of
the project. The costs were $15,000, and the expenditures $2,271.24.
    In connection with the Works Progress Administration project for
the construction of a fill on the shoal northeast of Yerba Buena
Island, the United States hopper dredges Culebra, Mackenzie, King-
man, and Clatsop removed 845,719 cubic yards of material from
Presidio Shoal, 995,000 cubic yards from Alcatraz Shoal, and 1,353,-
025 cubic yards from Point Knox Shoal. The costs were charged to
the Yerba Buena project.
    Condition at end of fiscal year.-The existing project is about 82
percent completed. The dredging of Islais Creek Shoal was com-
pleted in 1930, the deepening of Presidio Shoal in 1931, the removal
of various rocks in 1932, the deepening of Point Knox Shoal in 1934,
the deepening of Alcatraz Shoal in 1936, and the deepening of
Black Point Shoal in 1937.
    The controlling depths over various items of the project and the
dates on which these depths were determined are as follows: Bar
channel, 47 feet, March 4, 1937; Presidio Shoal, 47 feet; Black Point
Shoal, 38 feet, close to the pierhead line; Alcatraz Shoal, 49 feet;
Point Knox Shoal, 35 feet; Islais Creek Shoal, 31 feet, all at the end
of the fiscal year; Rincon Reef Rock (inner), 41 feet, August 27,
1932; Rincon Reef Rock (outer), 41 feet, August 20, 1932; Blossom
Rock, 42 feet, May 10, 1932; Arch Rock, 35 feet, August 19, 1932;
Shag Rocks, nos. 1 and 2, both 37 feet, August 25, 1932; Harding
Rock, 35 feet, August 3, 1932. The work remaining to be done is the
completion of the bar channel, the removal of Raccoon Shoal, and
also the dredging of the channel and basin at the San Francisco Air-
port authorized in 1937. The cost of new work to the end of the fiscal
year was $193,000 from Public Works funds and $850,801.03 from
regular funds, a total of $1,043,801.03; the cost of maintenance was
 $159,786.89. The total expenditures to the end of the fiscal year were
 $193,000 from Public Works funds and minus $125,613.43 from
regular funds.
    Proposed operations.-The balance unexpended July 1, 1937,
amounting to $11,334.76, will all be applied to the payment of ac-
counts payable, June 30, 1937.
    The sum of $137,000, together with $137,000 of contributed funds,
can be profitably expended during the fiscal year 1939 for new work,
1426          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

dredging the channel and basin at San Francisco Airport, by con-
tract, August to December 1938.
                                       Cost and financial summary

Cost of new work to June 30, 1937---------------------------                                      1$2, 074, 200. 02
Cost of maintenance to June 30, 1937                                                                    35, 107. 84
                                                                                                       6--------------------------

      Total cost of permanent work to June 30, 1937-----------                                       2, 709, 307. 86
Undistributed costs June 30, 1937-----------------------------                                               975. 81

     Net total cost to June 30, 1937--------------------------2, 710, 283.67
Minus accounts payable June 30, 1937-------------------------     11, 334.76

     Net total expenditures---------------------------------   2, 698, 948. 91
Unexpended balance June 30, 1937            ------------------     1-----
                                                                   11, 334. 76

         Total amount appropriated to June 30, 1937-------------12, 710, 283. 67

  Fiscal year ending June 30             1933            1934              1935              1936              1937


Cost of new work_------------         $421, 755. 94   $140, 812. 64       $52, 187. 36-        -     .     $15, 000. 00
Cost of maintenance_________                448. 36      3, 236. 16        27, 680. 44    $102, 547. 12 ___________
      Total cost--------------         422, 204. 30    144, 048. 80        79, 867. 80     102, 547. 12        15, 000.00
Total expended---.............         382, 113. 99    105, 119. 78     -937, 397. 04       93, 727. 93         2, 271. 24

Allotted_.-.--....---.. .   ------     433, 114. 15    235, 732. 87   -1, 008, 217. 84        -              - 18, 764. 31


Balance unexpended July 1, 1936 ___   ___                                                                 $32, 370. 31
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936__--------- -------------------------                                                  15, 000. 00
     Amount to be accounted for____          -________________                                             47, 370. 31
Deductions on account of revocation of allotment____.   __....                                             33, 764. 31
      Net amount to be accounted for__                                                                     13, 606. 00
Gross amount expended________________________ _ $3, 665.24
Less receipts from sales----------------------------1, 394. 00
                                                                                                            2, 271.24

      Balance unexpended June 30, 1937---------                              ___________                   11, 334. 76
Outstanding liabilities June 30, 1937 -----                                -- _____ __                     11, 334. 76
Amount (estimated) required to be appropriated for completion
                           -- -
of existing project 2 3 -___________ ___________________                                                 252, 000. 00
Amount that can be profitably expended in fiscal year ending
                                  3--
June 30, 1939, for new work 2 ____________________________                                               137, 000. 00
  1 Includes $193,000 Public Works funds.
  SExclusive of available funds.
  * In addition, local interests required to contribute $137,000.

                                     2. REDWOOD CREEK, CALIF.

  Location.-Redwood Creek is a tributary of San Francisco Bay,
about 20 miles south of the city of San Francisco. (See U. S. Coast
and Geodetic Survey Chart No. 5531.)
  Previous projects.-The original project was adopted by the River
and Harbor Act of July 5, 1884, and modified by the River and
Harbor Act of June 13, 1902. The cost and expenditures of the
   RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT             1427

original and modified projects was $31,442.66. (For further details
of previous projects see p. 1979 of Annual Report for 1915.)
   Existing project.-This provides for a channel 27 feet deep and 200
feet wide from deep water in San Francisco Bay to the junction of
Redwood Creek and West Point Slough, with an enlargement at a
bend, about 1,100 feet long and 250 feet wide; for a turning basin
about 1,800 feet long, 700 feet wide, and 27 feet deep at the inner end
of the channel; thence 5 feet deep and 150 feet wide to the old
municipal wharf on the right bank at the mouth of Steinberger
Slough, about three-fourths of a mile below Redwood City. All
depths refer to mean lower low water. The tidal range between
mean lower low water and mean higher high water at the mouth of
the creek is 7.9 feet, with an extreme range of about 13.5 feet.
   The estimate of cost for new work, revised in 1935, is $250,300,
exclusive of amounts expended under previous projects, but inclusive
of $120,000 contributed by local interests. The latest (1935) approved
estimate for annual cost of maintenance is $16,500.
   The existing project was adopted by the following river and harbor
acts: The act of June 25, 1910, provided for a 5-foot channel (H.
Doc. No. 307, 61st Cong., 2d sess.) ; the act of July 3, 1930 (H. Doc.
No. 142, 70th Cong., 1st sess.), provided for a 20-foot channel, and
the act of August 30, 1935, provided for the 27-foot channel and turn-
ing basin at the inner end, 27 feet deep, 1,800 feet long, and 700 feet
wide (Rivers and Harbors Committee Doc. No. 10, 73d Cong., 1st
:sess.). The latter document contains the latest published map.
   Local cooperation.-The work authorized by the River and Harbor
Act of August 30, 1935, is subject to the requirements that local
interests shall contribute one-half of the cost of the work but not to
exceed $94,000, shall furnish free of cost to the United States all
necessary rights-of-way and siitable areas for the disposal of dredged
material during initial construction, and for future maintenance as
and when needed, and to the further provisions that no work shall
be undertaken on the Federal project until a port district with ade-
quate powers and resources to carry out the proposed terminal devel-
opment has been formed and has given assurances satisfactory to the
Secretary of War that it will construct suitable modern port facilities
for deep-draft ocean vessels with a wharf frontage of not less than
450 feet. The net estimated first cost to the United States is $94,000.
These requirements have been complied with. Fulfillment was ap-
proved by the Chief of Engineers January 25, 1937.
   Terminal facilities.-There are seven open-pile wharves of ordinary
pile construction and one bulkhead landing on Redwood Creek and
one wharf on West Point Slough. One wharf is a modern, publicly
owned, deep-water, general-cargo wharf open to all craft on equal
terms; five are for the exclusive use of the owners; one wharf and
the bulkhead landing are open to all shallow-draft craft. Three
wharves and the bulkhead landing have highway connections; there
are no direct railroad connections.
   Operationsand results during fiscal year.--As new work under con-
tract in force at the end of the fiscal year, 1,266,700 cubic yards of
material were removed from the project channel and turning basin.
The costs were $58,874.80 United States funds and $27,212.28 con-
tributed funds, a total of $86,087.08. The expenditures were $54,-
1428           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

121.76, of which $26,909.48 were from United States funds and
$27,212.28 from contributed funds.
  Condition at end of fiscal year.-The project is about 72 percent
completed. At'the end of the year the controlling depth in the chan-
nel was 20 feet from deep water in San Francisco Bay to the junction
of Redwood Creek and Corkscrew Slough; thence 28 feet to the head
of the turning basin, except that in the easterly portion of the turning
basin the depth was 20 feet. In September 1929, the date of the last
survey, the channel upstream from the turning basin was 6 feet deep
to the municipal yacht harbor at Boundary Slough; thence 4 feet
deep to Smith Creek; thence shoaling to mean lower low water at
the head of navigation at the Bayshore Highway Bridge.
  The work remaining to be done is the completion of the turning
basin and the deepening of the channel from San Francisco Bay to
the junction of Redwood Creek and Corkscrew Slough.
  The cost of the existing project to the end of the fiscal year was
$95,195.60 for new work and $7,023.41 for maintenance, a total of
$102,219.01. The expenditures were $70,253.69. In addition, $53,-
212.28 was contributed and expended on new work.
  Proposed operations.-The balance unexpended July 1, 1937,
amounting to $67,090.52, together with $66,787.72 of contributed funds,
will be applied as follows:
Accounts payable June 30, 1937, incurred in connection with the
  contract in force---------------------------------------------$64, 155.70
New work: Completion of project channel and turning basin under
  contract in force at the end of the fiscal year--------------------- 59, 084. 18
Balance remaining                                                          638. 36
                                                                       1------------------------------
           Total------------------------------------                                          133, 78. 24
    No work is contemplated for the fiscal year 1939.
                                         Cost and financial summary
                                            UNITED STATES    FUNDS


Cost of new work to June 30, 1937 -----------------------------                              $126, 638. 26
Cost of maintenance to June 30, 1937------------------------7,                                     023. 41

      Total cost of permanent work to June 30, 1937............                               133. 661. 67
Undistributed costs June 30, 1937-----------------------------                                     527. 86
      Net total cost to June 30, 1937---------------------------                              134, 189. 53
Minus accounts payable June 30, 1937                                                           32, 493. 18
     Net total expenditures----------------------------------                                 101, 696. 35
Unexpended balance June 30, 1937-------------                                                  67, 090. 52

          Total amount appropriated to June 30, 1937--------------                            168, 786. 87

          Fiscal year ending June 30                 1933     1934      1935          1936          1937


Colt of new work-. -- - -             .....                                    .. .               $58, 874. 80
Cost of maintenance---------------------------------------
Total expended--------------..........   ----------------------------                              26, 909. 48
                     ..........
Allotted--------------.......       ---------------------                             $94, 000
     RIVERS AND HARBORS-SAN                                       FRANCISCO, CALIF., DISTRICT                                                      1429
Balance unexpended July 1, 1936 ___________                                                                                            $94, 000. 00
Gross amount expended---------------------------------------                                                                            26, 909. 48

    Balance unexpended June 30, 1937------___-----------------                                                                          67, 090. 52
Outstanding liabilities June 30, 1937__-   ____------- $5, 127. 00
Amount covered by uncompleted contracts------------53, 119. 37
                                                                                                                                         5i8. 2446 37

           Balance available June 30, 1937___------                               ---------                                                  8, 844. 15

                                                     CONTRIBUTED FUNDS

Cost of new work to June 30, 1937------------------------------                                                                      1$53,  212. 28
Cost of maintenance to June 30, 1937-                                                                                               -------------

           Total cost of permanent work to June 30, 1937-------                                                                          53, 212. 28

Net total expenditures__----------------------------------------                                                                        53, 212. 28
Unexpended balance June 30, 1937-----------------------   ------                                                                        66, 787. 72

           Total amount contributed to June 30, 1937----------------                                                                   120, 000. 00

           Fiscal year ending June 30                        1933                 1934                  1935                1936                   1937


Cost of new work--.........-
                       - -                          - -- -- - - --...                              ..                                            $27, 212. 28
Cost of maintenance__-                                                                       ---
Total expended -------------
                       ___                                                                                                                        27, 212. 28
Contributed .            .--                                                  -              -                 - --         ---                   94, 000.00


Amount contributed                                       -----------                                                                   $94,000. 00
Gross amount expended                                                                                                                   27, 212. 28

     Balance unexpended June 30, 1937----       -----------                                                                              66, 787. 72
Amount covered by uncompleted contracts --------------------                                                                             6, 993. 51

           Balance available June 30, 1937-                                                                                                  1,794. 21
   1Not including $31,662.52 due for contractors' estimates.

       CONSOLIDATED              COST AND          FINANCIAL        SUMMARY              FOR REDWOOD                    CREEK,          CALIF.


Cost of new work to June 30, 1937--------                                                                                           1 $179, 850. 54
Cost of maintenance to June 30, 1937--------------------------                                                                               7, 023. 41

      Total cost of permanent work to June 30, 1937--__                                                                               1186, 873. 95
Undistributed costs June 30, 1937_                                                                                    ---                   527. 86

     Net total cost to June 30, 1937----------------------------                                                                       187, 401. 81
Minus accounts payable June 30, 1937 ..--                                                                                              132, 493. 18

           Net total expenditures_----------------------------------                                                                   154, 908. 63
Unexpended balance June 30, 1937                                 ----------                                                            133, 878. 24

           Total amount appropriated and contributed to June 30, 1937_                                                                 288, 786. 8&7

           Fiscal year ending June 30                        1933                 1934                  1935                1936                   1937


Cost of new work----              ----------------                     ------- ----                                             -            1 $86,087.08
Cost of maintenance...------------------.......-                                  -      -         -       -           -    -                -      -

Total expended         --------------- __--                                 ---- -       ----------- -----                                        54,121.76
Allotted and contributed----------..........          ..------                               -----------                    $94, 000             94,000.00

   1Not including $31,662.52 due from contributed funds for contractor's estimates.
1430     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936________________________                 $94, 000. 00
Amount contributed--_----------------                                _94,    000. 00

      Amount to be accounted for -------------                            188, 000. 00
Gross amount expended-----------------------------------------             54,121. 76

       Balance   unexpended   June 30,   1937________________________     133, 878.24
Outstanding liabilities June 30, 1937__________             $5, 127. 00
Amount covered by uncompleted contracts_______________     118, 112. 88
                                                                          123, 239. 88

       Balance available June 30, 1937____________________________         10, 638. 36

                       3. OAKLAND HARBOR, CALIF.

    Location.--Located on the eastern side of San Francisco Bay, oppo-
site the city of San Francisco. The inner harbor is situated between
the cities of Oakland and Alameda. (See U. S. Coast and Geodetic
Survey Chart No. 5535.)
    Previous projects.-Adopted by the River and Harbor Acts of
June 23, 1874, June 13, 1902, March 2, 1907, and June 25, 1910. The
costs and expenditures of the original and modified projects prior
to the adoption of the existing project were $4.386.801.03 for new
work and $684,028.18 for maintenance, a total of $5,070.829.21. For
further details see page 1979 of Annual Report for 1915, and page
1755 of Annual Report for 1921.
    Existing project.-This provides for an entrance channel about
11/2 miles long, 30 feet deep, and 800 feet wide, through the shoal
southeast of Yerba Buena Island, narrowing to 600 feet at the ends
of Oakland Jetties; a channel from the ends of the jetties to the
tidal canal, 30 feet deep, 600 feet wide, to the west end of Govern-
ment Island, thence 500 feet wide through Brooklyn Basin; for
drediging to a depth of 30 feet a triangular area about 2,700 feet long
and of a maximum width of 300 feet at the western end of Brooklyn
Basin: a turning basin at the east end of Brooklyn Basin 30 feet
deep. 500 feet wide, and 1,200 feet long; a channel 1.9 miles long in
the tidal canal, 30 feet deep and 275 feet wide from Brooklyn Basin
to Park Street, and 25 feet deep above the Park Street Bridge, to San
Leandro Bay; a total channel length of 81/2 miles. The proiect pro-
vides also for an entrance channel to the outer harbor, 30 feet deep
and 800 feet wide at the bay end, narrowing to 600 feet at the pier-
head line. The project also includes parallel rubble-mound jetties
at the entrance, a north jetty 9,500 feet long, and a south ietty
12,000 feet long; the maintenance of the north channel of Brooklyn
Basin, 25 feet deep and 300 feet wide, the maintenance to 30-foot
depth and to within 75 feet of the pierhead line of the area along the
south side of the channel from Harrison Street eastward to harbor
line point no. 58 in Brooklyn Basin; and three highway bridges across
the tidal canal constructed by the United States and operated by local
authorities, one of which (at Park Street) has been replaced by local
interests. All depths refer to mean lower low water.
    The range between mean lower low water and mean higher high
water is 6.1 feet, and the extreme range is 11 feet.
    The estimated cost of new work, authorized by the acts of Sep-
tember 22, 1922, January 21, 1927, and July 3, 1930, is $1,492,000, ex-
clusive of amounts expended on previous projects, and of which $150,-
  RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT             1431

000 is to be contributed by local interests. Overdepth dredging in
the main channel, in the nature of deferred maintenance, involved an
estimated expenditure of $1,035,000. The latest (1930) approved esti-
mate for annual cost of maintenance is $110,000.
  The existing project was authorized by the following river and
harbor acts: The jetties, by act of June 23, 1874 (Annual Report
for 1874, pp. 382-383); the north channel in Brooklyn Basin, by
act of June 25, 1910 (H. Doc. No. 647, 61st Cong., 2d sess.) ; the
channel across the shoal southeast of Yerba Buena Island, and thence
to Webster Street, the south channel in Brooklyn Basin, the turning
basin at the east end of Brooklyn Basin, the channel in the tidal
canal from Brooklyn Basin to Park Street, by act of September
22, 1922 (H. Doc. No. 144, 67th Cong., 2d sess.); the entrance chan-
nel to the outer harbor by act of January 21, 1927, as modified by
act of July 3, 1930 (Rivers and Harbors Committee Document No.
43, 71st Cong., 2d sess.); the channel from Webster Street to Brook-
lyn Basin, the maintenance of the area to within 75 feet of the pier-
head line south of the channel from Harrison Street to harbor line
point no. 58 in Brooklyn Basin, the dredging of a triangular strip
about 2,700 feet long and having a maximum width of 300 feet and
the deepening to 25 feet of the tidal canal above Park Street to San
Leandro Bay, by act of January 21, 1927 (H. Doc. No. 407, 69th
Cong., 1st sess.), as modified by the act of April 28, 1928. The draw-
bridges across the tidal canal were required by the decree of the
court in the condemnation proceedings whereby title was obtained
to the right-of-way for the tidal canal. The latest published maps
are in House Document No. 407, Sixty-ninth Congress, first session,
and Rivers and Harbors Committee Document No. 43, Seventy-first
Congress, second session.
  Local cooperation.-All requirements of local cooperation have
been satisfactorily met except those pertaining to the maintenance of
the north channel in Brooklyn Basin and the deepening of the tidal
canal.
   Terminal facilities.-There are 84 wharves and 13 ferry slips in
the harbor. These facilities are considered adequate. (See Port
Series No. 12, Corps of Engineers.)
   Operation and results during fiscal year.-The United States hop-
per dredges Kingman and San Pablo removed 520,832 cubic yards
of material from the channel across the shoal southeast of Yerba
Buena Island and the entrance channels to the inner and outer
harbors. By contract, 431,387 cubic yards of material were removed
from the turning basin at the eastern end of Brooklyn Basin and
the western end of tidal canal. All work was maintenance. Proj-
ect depth was restored in all the above areas. The cost and expendi-
tures were $135,708.18.
  Condition at end of fiscal year.-The existing project is about 82
percent completed. At the end of the year the controlling depth in
the channels across the shoal southeast of Yerba Buena Island and
to the inner and outer harbors was 31 feet for practically the full
project width. In the inner harbor, the channel was 31 feet to the
western end of Brooklyn Basin, 600 feet wide from the entrance to
Oak Street, Oakland, widening to 800 feet at the outfitting wharf of
the Bethlehem Shipbuilding Corporation, again widening to 1,200
1432          REPORT OF CHIEF OF ENGINEERS, U. ,S. ARMY, 1937

feet at the western end of Brooklyn Basin. Two shoals with a con-
trolling depth of 27 feet existed on the two sides of the turning basin
at that point. Thence the channel was 30 feet deep and 500 feet wide
to the turning basin at the eastern end of Brooklyn Basin, which
was 30 feet deep for its full dimensions. The controlling depth in the
tidal canal was 18 feet, with less depth near the channel edges. The
north channel in Brooklyn Basin was 20 feet deep for a width of 200
feet. The work remaining to be done is the deepening of the tidal
canal.
   The cost of the existing project to the end of the fiscal year was
$1,218,009.23 for new work, of which $1,134,462.21 was from United
States funds and $83,547.02 from contributed funds, and $1,465,667.22
for maintenance, a total of $2,683,676.45. The expenditures were
$2,683,676.45, of which $2,600,129.43 was from United States funds
and $83,547.02 from contributed funds.
   Proposed operations.-An allotment of $15,000, made during July
1937, will be applied to maintenance dredging in the entrance chan-
nel and in the inner harbor by Government hopper dredge during
March 1938.
   The sum of $30,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging, by contract, on certain shoal
areas in the inner harbor during July and August, 1938.
                                       Cost and financial summary
Cost of new work to June 30, 1937-------------------------                                                     1 $5, 521, 263. 24
Cost of maintenance to June 30, 1937--_____________________                                                        2, 149, 695. 40
      Total cost of permanent work to June 30, 1937                                                                 , 670, 958. 64
                                                                                                                   7-----------
Net total expenditures_________    __________                                                                     17, 670, 958. 64
Total amount appropriated to June 30. 1937-------------------                                                      7. 670. 958.64

           Fiscal year ending June 30                    1933               1934              1935             1936            1937

Cost of new work-     .----
                       -    -     -                ---            -           ----.---
Cost of maintenance             _------------------ $19,699.97         $3,476.03           $1,981. 92     $1,224.16         $135, 708. 18
Total expended          _        _____----------------------
                                                    18, 665. 83            3, 211. 88     -9, 627. 40         1, 224. 16     135, 708. 18
Allotted                               19, 562. 79 20, 552. 33
                 ...........................----------------------------
                                                               42, 097. 05 30, 000. 00                                        25, 720. 87

Balance unexpended July 1, 1936-___                                                                  __       _       $109, 987. 31
Amount allotted from War Department Appropriation
   Act approved Apr. 9, 1935                                     ---            --            $18, 764. 31
Amount allotted from War Department Appropriation
   Act approved May 15, 1936-                      -        --                --                6, 956. 56
                                                                                                                           25, 720. 87

      Amount to be accounted for-                                      -                 --               -            135, 708. 18
Gross amount expended----                                                                                              135, 708. 18

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937_-                                                                                                  15, 000. 00
Amount available for fiscal year 1938----------------------                                                                15, 000. 00

Amount (estimated) required to be appropriated for completion
   of existing        project23 __                  ______________                                                     107, 500.00
Amount that can be profitably expended in fiscal year ending
                                         -- -  -  -      - - -       -
June 30, 1939, for maintenance 2                     _         ____                                                       30, 000. 00
21 In addition, $83,547.02 was expended from contributed funds.
    Exclusive of available funds.
  a Local interests required to contribute $50,000 additional.
   RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT             1433
                    4. RICHMOND HARBOR,      CALIF.

   Location.-Located on the eastern shore of San Francisco Bay
about 10 miles north of Oakland. (See U. S. Coast and Geodetic
Survey Chart No. 5532.)
   Existing project.-This provides for a channel 30 feet deep from
San Francisco Bay to the Santa Fe Channel (Ellis Slough), 400 feet
wide between the bay and the basin at terminal no. 1; thence 500
feet wide to terminal no. 3, with an increased width to 1,000 feet
at the turn off Point Potrero, and a turning basin 850 feet wide and
about 2,500 feet long between the southern end of terminal no. 3
and the Santa Fe Channel; for the maintenance to a depth of 30
feet in the latter channel to within 50 feet of the established harbor
lines; for approach areas 32 feet deep to within 75 feet of the pier-
head line in the outer harbor at Point San Pablo, Point Orient, and
Richmond Long wharf; and for a training wall 10,000 feet long
extending in a general westerly direction from Brooks Island. All
depths refer to mean lower low water. The tidal range between
mean lower low water and mean higher high water is 5.8 feet, with
.an extreme range of about 11 feet.
    The estimate of cost of new work, revised in 1935, is $1,219,000.
The latest (1.935) approved estimate for annual cost of maintenance
is $35,000. The existing project was adopted by the following river
and harbor acts: The act of August 8, 1917, provided for a channel
24 feet deep and 600 feet wide in the inner harbor, and for the train-
ing wall (H. Doc. No. 515, 63d Cong., 2d sess.); act of July 3, 1930,
provided for a channel 30 feet deep but lessened the channel widths
  (Rivers and Harbors Committee Doc. No. 16, 70th Cong., 1st sess.);
and the act of August 30, 1935, provided for the present authorized
-widths in the inner harbor, the maintenance of the Santa Fe Chan-
nel, and the approach areas in the outer harbor (Rivers and Harbors
Committee Does. No. 7, 73d Cong., 1st sess., and No. 10, 74th Cong.,
1st sess.). Prior to adoption by the act of 1935 the project extensions
contained in Rivers and Harbors Committee Document No. 7, Sev-
enty-third Congress, first session, were authorized September 6, 1933,
by the Public Works Administration. The latest published map is
in the latter document.
    Local cooperation.-Theact of August 30, 1935, requires local inter-
ests to furnish spoil-disposal areas free of cost to the United States.
All prior requirements have been fully complied with.
    Terminal facilities.-In the inner harbor there are two modern
deep-water terminals, one oil wharf, one lumber wharf, one private
general-cargo wharf, seven wharves for intraport commerce, and one
ferry terminal. In the outer harbor there are one deep-water gen-
eral-cargo terminal, two oil wharves, one small barge wharf, one
wharf (at present idle), and one ferry terminal.
    Operations and results during fiscal year.-As new work, the turn-
ing basin in the inner harbor opposite terminal no. 2 was completed
by contract, 253,014 cubic yards of material being removed. The U.
S. hopper dredge San Pablo dredged the approach area in the outer
harbor at Long wharf, removing 175,101 cubic yards. As mainte-
nance, 86,677 cubic yards of material were removed by contract from
1434      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the lower end of the Santa Fe Channel, thereby restoring project
depth in that channel. The U. S. hopper dredge San Pablo dredged
295,155 cubic yards from several shoal areas in the entrance channel
to the inner harbor. The costs were $46,469.50 for new work and
$30,092.67 for maintenance, a total of $76,562.17. The expenditures
were $76,562.17.
  Condition at end of fiscal year.-The existing project is about 98
percent completed. On January 27, 1937, the channel from deep wa-
ter in San Francisco Bay had a controlling depth of 31 feet at mean
lower low water for a width of 400 feet to terminal no. 1; thence at
the end of the fiscal year, the channel was 500 feet wide and 27 feet
deep to the turn at Point Potrero; thence 26 feet deep and 1,000 feet
wide around that turn; thence 26 feet deep and 475 feet wide to the
lower end of the turning basin opposite terminal no. 3; thence 29 feet
deep to the lower end of the Santa Fe Channel; thence 30 feet in that
channel to the upper end thereof. In the outer harbor the approach
area to Long wharf was 31 feet deep. The controlling depths in the
approach areas to the wharves at Point San Pablo and Point Orient,
yet to be dredged, were from 28 to 32 feet.
  The work remaining to be done to complete the project is the dredg-
ing of the approach areas to the wharves at Point San Pablo and Point
Orient, and the widening of the inner harbor channel just north of
Point Potrero from 475 to 500 feet.
  The cost of the existing project to the end of the year was $1,195,-
199.56 for new work ($565,421.90 from regular funds, $524,777.66
from contributed funds, and $105,000 from Public Works funds),
and $289,887.52 for maintenance ($255,087.32 from regular funds and
$34,800.20 from contributed funds). The expenditures were $1,485,-
087.08, of which $820,509 22 was from regular funds, $105,000 from
Public Works funds, and $559,577.86 from contributed funds.
  Proposed operations.-An allotment of $45,000 made during July
1937, will be applied to maintenance dredging in the inner harbor
channel from the basin opposite terminal no. 1 to the southern end of
the turning basin at terminal no. 3 with Government plant and hired
labor, August to October, 1937. Funds will be exhausted October 31,
1937.
  The sum of $25,000 can be profitably expended during the fiscal year
1939 for maintenance as follows:
Redredging the entrance channel to the inner harbor by Government
  hopper dredge, October and November 1938_-                                     --            $15, 000
Repairs to the training wall by contract July 1938 ---------------------                          10, 000

       Total-------------------------------                                      ---              25,000

                              Cost and financial summary
Cost of new work to June 30, 1937 _-         ---------                                1   $670, 421. 90
Cost of maintenance to June 30, 1937-------------------                                    255, 087. 32

       Total cost of permanent work to June 30, 1937_-------
Net total expenditures------------------------------------
                                                                           ---             925,
                                                                                      12925,
                                                                                                  r.09.22
                                                                                                  500. 22
Total amount appropriated to June 30, 1937_                                           12 925, 509. 22
  1Excluding
  2
   Includes $105,000 Public Works funds.
              $559,577.86 contributed funds,  of which $524,777.66 was for new work
and $34,800.20 for maintenance; in addition, $275,414.77 was expended from contributed
funds for work outside the project.
     RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT                                                                       1435

         Fiscal year ending June 30                       1933           1934                1935             1936            1937


Cost of new work ...-------     -----------------------              $105, 000. 00     --               -                   $46, 469. 50
Cost of maintenance----------__                            $83.00      29, 487. 54                  _       $6, 239. 11      30, 092. 67
      Total cost.---------------------------                83.00     134, 487. 54 -                         6, 239. 11      76, 562. 17
Total expended     ....--------------------------           83. 00    134, 487. 54     _6,                     239. 11       76, 562. 17
Allotted_                                                  --------------------------------
                                                          -79. 60 134, 989.55  -$502.01   72, 700. 00                        10, 101.28


Balance unexpended July 1, 1936__________________                                                                     $66, 460. 89
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936----------       ____________                                                                        15,000.00
      Amount to be accounted for ________________ ______-                                                   __            81,460. 89
Deductions on account of revocation of allotment _-_ __- -                                                   _             4, 898. 72

      Net amount to be accounted for______________-__-__
                                                   -_                                                                     76, 562. 17
Gross amount expended__     -________  _--_____________                                                                   76, 562.17

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 -_-________                                                                                       45, 000. 00
Amount available for fiscal year 1938-----------------------------                                                        45, 000. 00
Amount (estimated)               required to be appropriated for completion
   of existing project 3_                   ____                     ____________________                                 24, 800. 00
Amount that can be profitably expended                                  in fiscal year ending
   June 30, 1939, for maintenance 3-_._-                                ____-______-_                                     25, 000. 00
   3 Exclusive of available funds.

            5. SAN PABLO BAY AND MARE ISLAND STRAIT, CALIF.

  Location.-The channel extends from a point in the lower end of
San Pablo Bay west of Pinole Point in a general northeasterly di-
rection across Pinole Shoal in San Pablo Bay to the junction of
Carquinez Strait and Mare Island Strait, thence northwesterly in
Mare Island Strait along the frontage of the Mare Island Navy
Yard. (See U. S. Coast and Geodetic Survey Chart No. 5533.)
  Previous projects.-Adopted by the River and Harbor Acts of
June 13, 1902, February 27, 1911, and August 8, 1917. The total
cost was $2,446,083, of which $1,086,703.45 was for new work and
$1,359,379.55 was for maintenance. The total expenditures were
$2,639,730.97. The above total does not include $22,422.40 recovered
by a contractor subsequently through a ruling by the auditor for
the War Department. (For further details for San Pablo Bay see p.
1981 of Annual Report for 1915, and for details of Mare Island
Strait improvement by the Navy Department see p. 4 of H. Doc. No.
1103, 60th Cong., 2d sess.)
  Existing project.-This provides for dredging a channel across
Pinole Shoal in San Pablo Bay 600 feet wide and 35 feet deep;
thence through Mare Island Strait a channel 600 feet wide and 30
feet deep, with a turning basin 1,000 feet wide in front of the quay
wall, 30 feet deep, except in the northeast corner adjacent to the
northerly limits of the city of Vallejo, where the project depth is 26
feet. All depths refer to mean lower low water. The tidal range
between mean lower low water and mean higher high water is 5.9
feet at the lower end of San Pablo Bay, and 6.4 feet opposite the
Mare Island Navy Yard, with an extreme range of about 10 feet.
1436    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    The estimate of cost for new work, revised in 1928, was $750,0000,
including $500,000 estimated cost of maintenance during progress of
work but exclusive of amounts expended on previous projects. The
latest (1931) approved estimate for annual cost of maintenance is
$165,000.
    The existing project was authorized by the following river and
harbor acts: The act of February 27, 1911, provided for a depth of
30 feet through Pinole Shoal (H. Doc. No. 1103, 60th Cong., 2d
sess.); act of August 8, 1917, provided for a depth of 35 feet in
the turning basin (H. Doc. No. 140, 65th Cong., 1st sess.); and the
act of January 21, 1927, provided for increasing the width of the
channel to 600 feet and decreasing the channel depth in Mare Island
Strait to 30 feet (H. Doc. No. 104, 69th Cong., 1st sess.). The latest
published map is in the last-mentioned document.
    Terminal facilities.-There are 3 wharves along the southern shore
of San Pablo Bay, 2 along the northern shore, 11 wharves along the
southern shore of Carquinez Strait, and 4 on the northern shore of
this strait; in Mare Island Strait there are 5 commercial wharves
and 2 ferry slips, in addition to the navy-yard facilities. The fa-
cilities are adequate. (See Port Series No. 12, Corps of Engineers.)
    Operations and results during fiscal year.-The United States
hopper dredge San Pablo removed 1,098,730 cubic yards from the
channel and turning basin in Mare Island Strait. The United States
Waterways Experiment Station completed the study made with a
view toward reducing the amount of maintenance dredging in Mare
Island Strait. All work was maintenance. The costs were $60,619.29
and expenditures were $60,625.29.
    Condition at end of fiscal year.-The existing project was completed
in 1999. At the end of the year the channel through Pinole Shoal
was 36 feet deep for the full channel width to a point 1,500 feet down-
stream from buoy 7, thence the controlling depth was 31 feet at mean
lower low water. On the same date the channel in Mare Island
Strait was 30 feet deep to a point about 1,500 feet upstream from
the ammunition wharf; thence 27 feet deep to the turning basin, the
depths along the edges of the channel being somewhat less in places.
In the turning basin and along the quay wall the controlling depth
was, in general, 27 feet, except along the Vallejo side and in the
upper end where some depths as shoal as 15 feet existed.
    The cost of the existing project to the end of the fiscal year was
 $132,923.90 for new work and $698,348.50 for maintenance, a total of
 $831,272.40. The expenditures were $637,624.43.
    Proposed operations.-The balance unexpended July 1, 1937,
amounting to $20,219.73, together with an allotment of $75,000 made
during July 1937, will be applied as follows:
Maintenance dredging in Mare Island Strait Channel and turning
basin by Government hopper dredge, November 1937 to April
1938--------------------------------------------------------     $75, 219. 73
Model study made in cooperation with the Waterways Experiment
  Station at Vicksburg to investigate the possibility of reducing
the cost of maintenance of the Mare Island Strait Channel------ 20, 000. 00
       Total__-----------------------------------                   95, 219. 73
  The additional sum of $75,000 can be profitably expended during
the fiscal year 1939 for maintenance dredging in the Mare Island
    RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT                                                                  1437
Strait Channel and turning basin and in the Pinole Shoal Channel
by Government hopper dredge, November 1938 to April 1939.
                                   Cost and financial summary

Cost of new work to June 30, 1937_---------------   _____                                                  $1, 219, 627. 35
Cost of maintenance to June 30, 1937__________ ______--___                                                  2, 057, 728. 05
        Total cost of permanent work to June 30, 1937-----------                                            3, 277, 355. 40
Net total expenditures-- ___________ ________                                                               3, 277, 355. 40
Unexpended balance June 30, 1937 _____1-__ ____________                                              -          20, 219. 73
        Total amount appropriated to June 30, 1937--------------                                            3, 297, 575. 13

        Fiscal year ending June 30                      1933              1934            1935           1936           1937


Cost of new work.----------------------.--------
Cost of maintenance-------
                   .-.-.----      _   --            $20, 665. 86      $51, 705. 54   $56, 395. 00   $92, 393. 82      $60, 619. 29
Total expended--__        -___________________47, 256. 29             -2, 957. 29 -51, 065. 71      90, 841. 73        60, 625. 29
Allotted-----------------------------                44, 263. 41       74, 095. 69 -76, 676. 87     100, 000. 00

Balance unexpended July 1, 1936-                                                                                   $80, 845. 02
Gross amount expended                                          ----                                                 60, 625. 29

        Balance unexpended June 30, 1937--------------------------                                                  20, 219. 73
Outstanding liabilities June 30, 1937--              --- -                                                          20, 000. 00

     Balance available June 30, 1937-   -                                                                              219. 73
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937--               -   -   --               --                   --------                      75, 000. 00

      Balance available for fiscal year 1938----------------------_                                                 75, 219. 73
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance -1                                                                                       75, CO0. 00
   1 Exclusive of available funds.

                                      6. NAPA RIVER, CALIF.

  Location.-This stream rises in the St. Helena Mountains, flows
in a southerly direction, and empties into Mare Island Strait. The
navigable portion is a tidal estuary. The head of navigation is at
the city of Napa, 17 miles above the mouth. (See U. S. Coast and
Geodetic Survey Chart No. 5533.)
  Previous projects.-The original project was adopted by the River
and Harbor Act of August 11, 1888, and modified by the River and
Harbor Act of March 2, 1919. The cost and expenditures were $27,-
555.55 for new work and $34,595.68 for maintenance, a total of
$62,151.23. For further details see page 1756, Annual Report for
1930.
  Existing project.-This provides for a channel 8 feet deep at mean
lower low water from Mare Island Strait to the head of navigation
at Napa, 100 feet wide below the mouth of Asylum Slough, 75 feet
wide from Asylum Slough to the head of the project, with additional
widths at certain difficult bends. The length of the section included
in the project is 17 miles. The range between mean lower low water
and mean higher high water is 6.4 feet at the mouth and 7.1 at the
head of navigation. The extreme range is about 11 feet.
1438              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimated cost for new work, made in 1931, is $62,500. The
latest (1935) approved estimate for annual cost of maintenance is
$8,000.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 6, 72d
Cong., 1st sess.). The latest published map is in that document.
   Local cooperation.-The act of August 30, 1935, requires that local
interests furnish to the United States all necessary rights-of-way and
suitable disposal areas. These requirements have been complied
with. Fulfillment was approved by the Chief of Engineers May 11,
1936.
   Terminal facilities.-There are 14 wharves on the river, 6 of which
are for general cargo, 4 are in connection with oil-distributing plants,
and 4 for other miscellaneous purposes.
     Operations and results during fiscal year.-For new work, by con-
tract, under way at the end of the fiscal year, 173,000 cubic yards of
material were removed. The cost was $68,412.78. The expenditures
were $27,150.95.
   Condition at end of fiscal year.-The project is about 95 percent
completed. At the end of the year the controlling depth was 10 feet
to a point about 8 miles upstream from the Mare Island Causeway,
thence 8 feet to the head of the project. The work remaining to be
done is to complete the widening at Jacks Bend now under contract.
The cost of the existing project to the end of the fiscal year was
$68,412.78, all for new work. The expenditures were $27,150.95.
   Proposed operations.-The balance unexpended July 1, 1937,
amounting to $47,849.05, will be applied as follows:
Accounts payable on contract in force at end of fiscal year-----------$41, 261. 83
New work: Completion of project under contract in force at end of
    fiscal year (July, 1937) ----------                                                                           3, 587. 22
Balance remaining------------------------------------------                                                       3, 000. 00
           Total --------------------------------------------                                           ---      47, 849. 05
     No work is contemplated for the fiscal year 1939.
                                               Cost and financial summary

Cost of new work to June 30, 1937--------------------------------                                               $95, 968. 33
Cost of maintenance to June 30, 1937--------------------_____                                                    34, 595. 68
     Total cost of permanent work to June 30, 1937----------------130, 564. 01
Minus accounts payable June 30, 1937------------------------------ 41, 261. 83

           Net total expenditures                            ---------                              _            89, 302. 18
Unexpended balance June 30, 1937--------------------------------47, 849. 05
           Total amount appropriated to June 30, 1937-----------------                                          137, 151. 23

          Fiscal year ending June 30                                   1933           1934   1935        1936         1937


Cost of new work--.---------                             ---------------------------------                         $68, 412. 78
Cost of maintenance                                                                                                           -
Total expended .---....--------------------------------                                                             27, 150. 95

Allotted_-----               --------------.---------------------------------                                       7------------
                                                                                                                    75, 000. 00
              A        .l                                      .   .                                                7...
   RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT                          1439
Amount allotted from War Department Appropriation Act approved
  May 15, 1936     -------------------
                                _      -----------                       $75, 000.00
Gross amount expended-------------------          ----------------------  27, 150. 95
      Balance unexpended June 30, 1937-                          -        47, 849. 05
Outstanding liabilities June 30, 1937.-----------------$3, 107.00
Amount covered by uncompleted contracts--------------37, 554. 56
                                                                          40, 661. 56

      Balance available June 30, 1937 -------------------------            7, 187. 49

                         7. PETALUMA CREEK, CALIF.

   Location.-This stream rises in the hills north of Petaluma, flows
southeasterly about 20 miles, and empties into the northwest side
of Sn Pablo Bay about 22 miles from San Francisco. (See U. S.
Coast and Geodetic Survey Chart No. 5533.)
   Previous projects.-Adopted by the River and Harbor Acts of June
14, 1880, July 13, 1892, July 18, 1918, and March 3, 1925. The cost of
previous projects was $212,082.95 (not including $15,558.55 con-
tributed funds) for new work and $314,692.30 for maintenance, a
total of $526,775.25. The expenditures were $526,775.25 from United
States funds and $15,558.55 from contributed funds; a total of
$542,333.80. For further details see page 1982 of Annual Report for
1915 and page 1665 of Annual Report for 1929.
   Existing project.-This provides for a channel 8 feet deep and
200 feet wide in San Pablo Bay to the mouth of the creek; thence 8
feet deep and 100 feet wide in the creek to Western Avenue, Peta-
luma, including a depth of 8 feet in the turning basin; thence 4 feet
deep and 50 feet wide to Washington Street Bridge; thence 4 feet
deep and 40 feet wide to a point 935 feet above the Washington
Street Bridge. All depths refer to mean lower low water.
   The tidal range between mean lower low water and mean higher
high water is 6.1 feet at the entrance and 7.5 feet at the head of navi-
gation, with an extreme range of 10 feet.
  The estimate of cost for new work, made in 1928, was $185,000, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $22,000.
  The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 183, 70th Cong., 1st sess.). The latest
published map is in this document.
  Local cooperation.-Fully complied with.
   Terminal facilities.-There are 33 wharves and landings on the
creek, which are considered to be adequate.
   Operations and results during fiscal year.-The project channel
between a point 800 feet downstream from Haystack Landing and
the foot of Western Avenue, Petaluma, and the turning basin in
Petaluma were redredged. The amount of material removed was
275,193 cubic yards. A small shoal amounting to 1,500 cubic yards
of rocky material was removed from the channel near Donohue Land-
ing. All work was maintenance and done by contract. The costs
and expenditures were $51,711.07.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1933 at a saving of $99,937 under the estimated cost. At
the end of the year, the controlling depths were 6.5 at mean lower
low water in San Pablo Bay to beacon 2, marking the lower end of
      20196-37-pt. 1--91
1440              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 193T

the channel to the mouth of Petaluma Creek; thence 8 feet in that
channel and in the creek to the lower end of the turning basin at
Petaluma; thence 6 feet in the turning basin; thence shoaling to 2
feet at the foot of Western Avenue; thence about 1 foot in the middle
of the channel to the head of the project.
   The costs of the existing project to the end of the fiscal year were
$85,062.57 for new work and $51,711.07 for maintenance, a total of
$136,773.64. The expenditures were $136,773.64.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1938 or 1939.
                                                   Cost and financial summary
                                  __
Cost of new work to June 30. 1937                                                                             _   -___-           '$297, 145. 52
Cost of maintenance to June 30, 1937                                             ----                                   __             366, 403. 37

             Total cost of permanent work to June 30, 1937                                                  -____
                                                                                                              --                      1663, 548. 89
Net total expenditures                                                                                                                 663, 548. 89
Total amount appropriated to June 30, 1937                                                                                                   548.89
                                                                                                                                       6---------------------1663,

            Fiscal year ending June 30                               1933               1934             1935                  1936          1937


Cost of new work------....                   ..--------------     $85, 062. 57           ....
Cost of maintenance....---..............--------------           --....
                                                                   --------      -----------         -------------- ---- --                $51, 711.07
Total expended........................----------------------..     84, 714. 57          $348. 00-----------------------51,                     711. 07

Allotted--...........--------------------------                    85, 062. 57 -...            .--   -       --.-----...----                51, 711. 07


Amount allotted from War Department Appropriation Act ap-
  proved Apr. 26, 1934__----------------_ ------------------ --                                                                        $55, 000. 00
Deductions on account of revocation of allotment----------------                                                                         3, 288. 93

      Net amount to be accounted for-----------------------                                                                             51, 711. 07
Gross amount expended--------------------------------                                                                                   51, 711. 07
    1 Not including $15,558.55 contributed funds expended on this work.

                                            8. SAN RAFAEL CREEK, CALIF.

   Location.-This is a small, mainly tidal stream about 2 miles in
length, flowing easterly and emptying into the west side of San
Francisco Bay, 14 miles north of San Francisco. (See U. S. Coast
and Geodetic Survey Chart No. 5532.)
   Existing project.-This provides for a channel 8 feet deep and 100
feet bottom width across the flats in San Francisco Bay to the mouth
of the creek; thence 6 feet deep and 60 feet bottom width up to. Irwin
Street, San Rafael; a cut-off through Goose Neck Bend, and a turning
basin 200 feet long, 100 feet wide, and 6 feet deep at San Rafael, near
the head of the project. All depths refer to mean lower low water.
   The tidal range between mean lower low water and mean higher
high water is 5.9 feet, with an extreme range of 10.5 feet.
   The estimate of cost for new work, revised in 1928, was $73,000.
The latest (1931) approved estimate for annual cost of maintenance
is $17,500.
   The existing project was authorized by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 801, 63d Cong., 2d sess.). No map
of the locality has been published.
   Local cooperation.-Fully complied with.
    RIVERS AND HARBORS-SAN                                       FRANCISCO, CALIF., DISTRICT                                       1441
   Terminal facilities.-There are five wharves and nine bulkhead
landings on San Rafael Creek. These facilities are considered
adequate.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1928. On March 18, 1937, the controlling depth in the entrance chan-
nel to the mouth of the creek was 3.5 feet; thence the same depth in
the creek to a point about 200 feet downstream from the head of the
project. At the head of the project the channel was practically dry
at low water.
  The total cost of the existing project to the end of the fiscal year
was $73,452.66 for new work ($32,358.85 from United States funds.
and $41,093.81 from contributed funds), and $149,216.92 for mainte-
nance, a total of $222,669.58, of which $181,575.77 were from United
States funds and $41,093.81 from contributed funds. The expendi-
tures were $221,840.48, of which $180,746.67 were from United States
funds and $41,093.81 from contributed funds.
  Proposed operations.-An allotment of $35,000 made during July
1937, will be applied to maintenance work with Government plant
and hired labor during July and August 1937.
   No work is contemplated for the fiscal year 1939.
                                               Cost and finan(cial sumnnutry

Cost of new work to June 30, 1937                                         ________________________                         $32, 358. 85
Cost of maintenance to June 30, 1937                           ___________________________                                 149, 216. 92

           Total cost of permanent work to June 30, 1937-                                               __                 181, 575. 77
Net total expenditures -----                                                              ---           ---           1181,     575.77
Total amount appropriated to June 30, 1937 ____________-____ 1181, 575. 77

           Fiscal year ending June 30                          1933           1934               1935          1936                1937


Cost of new work -
Cost of maintenance-.
                      .-
                                  .-
                                       -   -                 .-.-
                                                          $31, 256. 54 _--------
                                               __----------------
                                                                  -...-- $9, 496. 82 -.
                                                                                                             --.-   .- .
                                                                                                                           --- -     -.-........
                                                                                                                                          --
Total expended-...-..----.--                        .____   31, 256. 54   ------------          8,640.72       $829. 10
Allotted       ................-------------------------    31,256.54 ------------          10,000.00          -530. 18

Amount allotted during July 1937-------------------------------                                                            $35, 000. 00
Amount available for fiscal year 1938____________--_____________
                                                          ----                                                              35, 000. 00
   1 Not including $41,093.81 expended from contributed funds.

                                                9. NOYO RIVER, CALIF.

   Location.-This stream rises in the Coast Range Mountains and
flows westerly, emptying into the Pacific Ocean through Noyo Cove,
about 135 miles northwest of San Francisco. (See U. S. Coast and
Geodetic Survey Chart No. 5703.)
   Previous projects.-Adopted by the River and Harbor Act of
September 22, 192.     The cost under this project was $11,985.28 (not
including $7,179.86 contributed funds) for new work and $32,096.55
 (not including $820.14 contributed funds) for maintenance, a total of
$44,081.83. The expenditures were $44,081.83 from United States
funds and $8,000 from contributed funds.
1442          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.--This provides for an entrance channel 10 feet
deep and 100 feet wide and a channel in the river 10 feet deep and
150 feet wide extending to the highway bridge at Noyo, to be obtained
by dredging and jetty construction. All depths refer to mean lower
low water. The tidal range between mean lower low water and mean
higher high water is 5.8 feet. The extreme range is about 11.5 feet.
   The estimate of cost for new work, made in 1930, was $180,000. The
latest approved estimate for annual cost of maintenance is $10,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (S. Doc. No. 156, 71st Cong., 2d sess.). The latest pub-
lished map is contained in this document.
   Local cooperation.-Fully complied with.
  Terminal facilities.-There are seven wharves, three oil terminals
for fueling fishing boats, and one boat-repair plant equipped with
marine railway. These facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year:--None. Expenditures
were $21.05.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. On March 13, 1937, the controlling depth in the
channel at the mouth of the river was about 4.0 feet thence 4.5 feet in
the middle of the channel to within 200 feet of the head of the
project.
   The total cost of the existing project to the end of the fiscal year
was $183,684.66 for new work and $25,131.45 for maintenance, a total
of $208,816.11. The expenditures were $208,837.16.
  Proposed operations.-The balance unexpended July 1, 1937,
amounting to $12,377.67, will be applied to maintenance, removing
two shoals at the mouth of the river and at the head of the project,
with hired labor, July-September 1937. The funds will be exhausted
September 30, 1937.
   No work is contemplated for the fiscal year 1939.
                                       Cost and financial summary
Cost of new work to June 30, 1937---------------------------$195, 669. 94
Cost of maintenance to June 30, 1937---------------------      57, 228. 00
C,     Total cost of permanent work to June 30, 1937----------- 1252, 897. 94
fhfistributed costs June 30, 1937--------------------------------21.       05
         Net total cost to June 30, 1937- ----------------------                                  252,918. 99
Net total expenditures------------------------------------                                        252, 918:'99
Jgx<~4e    balance June 30, 1937----------------------------                                        2, 377. 67
   ~97
     0 'ogi               iount appropriated to June 30, 1937 --------------                       265, 296. 66

         Fiscal year ending June 30               1933         1934          1935          1936         1937



  sy IA-uM.
       t-----------$6,                             706.61    $4, 073.04   $2, 805.70    ----------- ---------
            S----------                         24, 591.52    3,381. 13    3, 497. 61                     $21. 05
                               __O__              -64. 20        -3. 01   -4, 434. 85    $7, 500. 00    4, 898. 72

  1 Not including $7,179.86 for new work and $820.14 for maintenance                           expended from
contributed funds.
   RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT                   1443
Balance unexpended July 1, 1936-------------------------------$7,      500.00
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-------------------------------------       4, 898. 72

      Amount to be accounted for-----------------------------       12, 398. 72
Gross amount expended------------------------------------   -----        21. 05

      Balance unexpended June 30, 1937------------------------      12, 377. 67

              10. HUMBOLDT      HARBOR AND BAY, CALIF.

   Location.-Humboldt Bay is a small, land-locked harbor on the
coast of California, 225 miles north of San Francisco Bay and 70
miles south of Crescent City Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 5832.)
   Previous projects. Adopted by the River and Harbor Acts of
March 3, 1881, September 19, 1890, July 3, 1892, March 3, 1899, and
March 2, 1907. The costs and expenditures on the original and modi-
fied projects were $2,261,370.93 for new work and $98,205.75 for
maintenance, a total of $2,359,576.68. For further details see pages
1982-1984 of Annual Report for 1915 and page 1673 of Annual
Report for 1929.
   Existing project.-This provides for two rubble-mound jetties at
the entrance-the north jetty about 4,500 feet in length and the
south jetty 5,100 feet long, not including shore revetments; for an
entrance channel with suitable alinement 30 feet deep and 500 feet
wide; for a channel 26 feet deep and 400 feet wide from deep water
in Humboldt Bay to the foot of N Street, Eureka; a channel 26 feet
deep and 300 feet wide across Indian Island Shoal to Samoa; a
channel 18 feet deep and 150 feet wide to Arcata wharf; and a
channel 26 feet deep and 300 feet wide to Fields Landing, with a
turning basin 600 feet wide and 800 feet long off the Fields Landing
wharf. All depths refer to mean lower low water. The tidal range
between mean lower low water and mean higher high water is 6.4
feet at the south jetty and 6.7 feet at Eureka. The extreme range
is 12.5 feet at the south jetty and 12 feet at Eureka.
   The estimate of cost for new work, revised in 1937, is $2,793,000, of
which $95,000 was contributed by local interests. This estimate is
exclusive of the amounts expended on previous projects. The latest
(1937) approved estimate for annual cost of maintenance dredging
is $58,000. There is no approved estimate for maintenance of the
jetties.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for rebuilding the
jetties (H. Doc. No. 950, 60th Cong., 1st sess.); act of July 3, 1930,
provided for a depth of 20 feet and widths of 250 and 300 feet in
the bay channels and for the channel to Arcata wharf (H. Doc. No.
755, 69th Cong., 2d sess.) ; and act of August 30, 1935, provided for
the entrance channel (Rivers and Harbors Committee Doc. No. 14,
74th Cong., 1st sess.) ; and act of August 26, 1937, provided for the
present project dimensions of the bay channels and the construction
of the turning basin off Fields Landing wharf (Rivers and Harbors
Committee Doc. No. 11, 75th Cong., 1st sess.). The latest published
map is contained in the last-described document.
1444     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-The act of August 26, 1937, requires that local
interests furnish, free of cost to the United States, suitable spoil-
disposal areas for new work in connection with the channels in the
bay and for their subsequent maintenance. It is expected that these
requirements will be complied with. All prior requirements have
been fully complied with.
   T'erminal faoilities.-There are 40 wharves and 7 small-boat land-
ings. These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. hopper
dredge San Pablo removed 71,006 cubic yards from the Fields Land-
ing Channel. Concrete in the amount of 152.5 cubic yards was placed
at the seaward end of the south jetty by hired labor. All work was
maintenance. The costs were $37,165.18, and the expenditures were
$32,333.
   Condition at end of fiscal year.-The existing project is about 93
percent completed. The north jetty was completed in 1925, the south
jetty in 1927, and the Arcata Channel in 1931. The entrance channel
across the bar was dredged in 1935. The controlling depths in va-
rious channels at the dates shown were as follows:
                        Channel and controlling depth

Channel across the bar, June 1935__ 26 feet, but a controlling depth of more
                                         than 30 feet is available in the south-
                                         westerly entrance channel.
Entrance channel between the jetties, 30 feet for a width of 500 feet adjacent to
  June 1935.                             the south jetty.
Channel in front of Eureka, May 1937 19 feet to E St; thence 15 feet to within
                                         about 200 feet from the head of the proj-
                                         ect; thence about 12 feet in the souther-
                                         ly half of the channel to the head of
                                         the project.
Samoa Channel, May 1937_              20 feet.
Arcata Channel, May 1937              1---___
                                      18  feet to the seaward end of the Arcata
                                         wharf; thence shoaling to about 13 feet
                                         at the head of the project.
Fields Landing Channel, May 1937___ 17 feet.
   The work remaining to be done is that authorized by the River
and Harbor Act approved August 26, 1937, providing for the en-
largement of the Eureka, Samoa, and Fields Landing Channels and
the construction of the turning basin off the Fields Landing wharf.
   The total cost of the existing project to the end of the fiscal year
was $5,937,186.86, of which $2,554,856.89 was for new work ($2,-
459,856.89 from United States funds and $95,000 from contributed
funds) and $3,382,329.97 for maintenance. The total expenditures
were $5,937,180.91 ($5,842,180.91 from United States funds and $95,-
000 from contributed funds).
   Proposed operations.-The balance unexpended July 1, 1937,
amounting to $163.72, together with an allotment of $5,000 made
during July 1937, will be applied to watchman service and emer-
gency repairs to the jetties, July 1937 to June 1938.
   The additional sum of $238,000 can be profitably expended during
the fiscal year 1939 for new work, widening the Eureka, Samoa, and
Fields Landing Channels and deepening them to 26 feet, and con-
structing the turning basin off the Fields Landing wharf, by con-
tract, August to December 1938.
    RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT                                                                    1445
                                             Cost and financial summary

Cost of new work to June 30, 1937_ --      ___-------- -                                                     1   $4,721, 227. 82
Cost of maintenance to June 30, 1937 ---------------------                                                        3, 480, 535. 72

      Total cost of permanent work to June 30, 1937--------                                                       8, 201, 763. 54
Minus accounts payable June 30, 1937 ---------------                                                                        5. 95

      Net total expenditures___---__----- --                                                 __          -8, 201, 757. 59
Unexpended balance June 30, 1937 __                                    __163.72

       Total amount appropriated to June 30, 1937--------------8, 201, 921. 31

       Fiscal year ending June 30               ,          1933          1934             1935           1936             1937


Cost of new work      ------------------------------------------------------------------
Cost of maintenance---.---------------$129, 743. 42  $3, 724. 66 $49, 498. 56 $36, 103.30 $37, 165. 18
Total expended--       .. _..----      ___--------.--   109, 547. 49    9, 068. 46   35, 006. 79       32, 934. 68       32, 333. 00

Allotted_----.     ..-.-------------------              112, 639. 12   31, 507. 80      27, 115. 95    55, 000. 00     -21,956. 56


Balance unexpended July 1, 1936        __________                                                                   $54, 453.28
Deductions on account of revocation of allotment-..                                           -                      21, 956. 56

      Net amount to be accounted for_                                                                                32, 496. 72
Gross amount expended_                                                                                               32, 333. 00

      Balance unexpended June 30, 1937__                                                                                 163. 72
Outstanding liabilities June 30, 1937 _ ---                                                                               10.00

     Balance available June 30, 1937______________--__- ___                                                              153. 72
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--------       --------                                                                        5, 000. 00

       Balance available for fiscal year 1938_                              _____-__-             - ____--            5, 153. 72
Amount (estimated) required to be appropriated for comple-
tion of existing project 2-  -             -  .-                                                                   238, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work 2 ............                                                                         238, 000.00
  I2Exclusive
    Not including $95,000 expended from contributed
              of available funds.
                                                                           funds.


                              11. CRESCENT CITY HARBOR, CALIF.

  Location.-Located 17 miles south of the Oregon State line and
midway between San Francisco Bay and the mouth of the Columbia
River. (See U. S. Coast and Geodetic Survey Chart No. 5895.)
  Eisting project.-This provides for a rubble-mound breakwater
3,000 feet in length, bearing approximately S. 27 ° E. from Battery
Point, a rubble mound sand barrier from Whaler Island to the
easterly shore, for maintaining, by dredging, a basin 1,800 feet long
and 1,400 feet wide to a depth of 20 feet at mean lower low water,
except in rock, and for maintenance dredging in the vicinity of the
seaward end of the sand barrier.
  The range of tide between mean lower low water and mean higher
high water is 6.8 feet; the extreme range of tide is 12 feet.
  The estimate of cost for new work, revised in 1937, is $1,043,000.
The latest (1937) approved estimate for annual cost of maintenance,
including $5,000 for dredging outside the harbor basin, is $62,500.
1446     REPORT OF CHIEF OF ENGINEERS, U. ,S. ARMY, 1937

   The existing project was authorized by the following river and
harbor acts: The act of July 18, 1918, provided for the breakwater
 (H. Doc. No. 434, 64th Cong., 1st sess.). The conditions of local
cooperation were modified by the act of September 22, 1922 (Rivers
and Harbors Committee Doc. No. 4, 67th Cong., 2d sess.) ; the act of
January 21, 1927, extended the breakwater to its present project
length of 3,000 feet (H. Doc. No. 595, 69th Cong., 2d sess.) ; the dredg-
ing of the harbor basin was authorized by the River and Harbor Act
approved August 30, 1935 (Rivers and Harbors Committee Doc. No.
40, 74th Cong., 1st sess.) ; and the sand barrier, and the maintenance
dredging in the vicinity of the seaward end thereof, by the River
and Harbor Act approved August 26, 1937 (Senate committee print,
75th Cong., 1st sess.). The latest published map is in the last-inen-
tioned document.
   Local cooperation.-The act of August 26, 1937, requires that local
interests furnish, free of cost to the United States, necessary ease-
ments and rights-of-way, and a suitable quarry or source of royalty-
free rock for the construction of the sand barrier. It is expected
that these requirements will be complied with. All prior require-
ments have been fully complied with.
   Terminal facilities.-There are two wharves in this harbor, which
are considered adequate for existing commerce.
   Operations and resuzlt during fiscal year.-The UI. S. hopper dredge
San Pablo removed 27,756 cubic yards of material from the project
harbor area as maintenance. The cost was $11.162.76 and the ex-
penditures were $25,734.10.
   Condition at end of fiscal year.--The project is about 89 percent
completed. The breakwater was completed in 1930. The initial
maintenance dredging in the harbor area was completed in July 1936.
In May 1937 the controlling depth in the project harbor area was 20
feet at mean lower low water at the tankerage moorings and 15 feet
to within about 50 feet from the wharf of the Crescent City Dock Co.
The work remaining to be. done is the construction of the sand barrier.
   The total cost of the existing project was $907,726.88 for new work
 ($690,611.34 from United States funds and $217,115 54 from con-
tributed funds) and $250,393.70 for maintenance ($222,509.24 from
United States funds and $27,884.46 from contributed funds), a total
of $1,158,120.58 ($913,120.58 from United States funds and $245,000
from contributed funds). The total expenditures were $1,158,120.58
 ($913,120.58 from United States funds and $245,000 from contributed
funds).
   Proposed operations.-An allotment of $20,000 made during July
1937 will be applied to maintenance dredging in the harbor area with
Government hopper dredge., April and May 1938.
   The additional sum of $155,000 can be profitably expended during
the fiscal year 1939, as follows:
New work: Construction of the sand barrier from Whaler Island to the
  eastern shore, by contract, August to December 1938_ ___-       - $135, 000
Maintenance: Dredging in the harbor basin by Government hopper
dredge, April and May 1939 _______________                           20, 000

       TotaL -_   - -------------- _                _            _    15, 000
    RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT                                                                              1447
                                          Cost and financial summary
Cost of new work to June 30, 1937-________----__-______-                                                                 $690, 611. 34
Cost of maintenance to June 30, 1937_-----------------------_                                                             222, 509. 24

      Total cost of permanent work to June 30, 1937 ------------                                                          913, 120. 58
Net total expenditures -------------------__                                                                              913, 120. 58
Total amount appropriated to June 30, 1937                                                                               1913, 120. 58

           Fiscal year ending June 30                                1933         1934          1935              1936              1937


Cost of new work_ -----------         ----                i
Cost of maintenance_ --                                        $2, 635. 61         $74.99       $567. 77       $18,837. 24        $11, 162. 76

Total expended _________________                   .___             2, 643. 86      76. 74       567. 77         4, 265. 90        25, 734. 10
Allotted    ------------------------------                          1, 119. 36     -0.     79    502.01         30, 000. 00....


Balance unexpended July 1, 1936--------------------------------                                                           $25, 734. 10
Gross amount expended----------------------------$25, 758.60
Less reimbursements collected-------------------------     24. 50
                                                                                                                              25, 734. 10

Amount alloted from War Department Civil Appropriation Act ap-
proved July 19, 1937-----------------------------------------20, 000. 00
Balance available for fiscal year 1938 ---------------------------- 20, 000. 00
Amount (estimated) required to be appropriated for completion of
   existing project                 ---------------------                                                                 135, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939 :
      For new work          2------------------------------------                                                         135, 000. 00
      For maintenance                                         -----------------                                               20,000. 00

         Total 2_                                              -----         155, 000. 00
  1iNot including $245,000 contributed by local interests, $217,115.54 for new work and
$27,884.46 for maintenance.
   2 exclusive of available funds.

   12. EXAMINATIONS,                      SURVEYS, AND CONTINGENCIES                                               (GENERAL)

   The cost of work during the year amounted to $42,805.59; the
expenditures were $40,677.16.                                       The balance unexpended July 1, 1937,
amounting to $5,068.17, together with an allotment of $35,000 made
during July 1937, will be applied as needed during the fiscal year
1938 to payment of expenses incurred under this heading. The addi-
tional sum of $25,000 can be profitably expended during the fiscal
year 1939.
                                          Cost and financial summary

Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937--------------------------                                                           $151, 135. 76
           Total cost of permanent work to June 30, 1937-------------151, 135. 76
Minus accounts payable June 30, 1937- --                                             ---               -----                   2,911. 67

     Net total expenditures--------------------         ----    148, 224. 09
Unexpended balance June 30, 1937-------------------------------   5, 068. 17
           Total amount appropriated to June 30, 1937-------------                                                         153, 292. 26
1448           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


          Fiscal year ending June 30                          1933              1934               1935            1936           1937

        Cos owrk---------------
              ne                        ------------ ------------                             ------------       ------------ ---
Cost of maintenance--.-------------------         62        $7,682.
                                                       $18, 008. 59                           $23, 989. 37 $22, 279. 93         $42, 805. 59

Total expended_.---....-..-..--        ...    ---.      - 7, 686. 04          17, 952. 28      22, 852. 50       23, 035.09      40, 677. 16
Allotted_-----..............-..-......-....-32, 515. 41                       16, 576. 85      25, 000. 00       24, 000.00      17, 500. 00


Balance unexpended July 1, 1936                              $28, 245.33
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-------------__------------------------17, 500.00

      Amount to be accounted for__-_______
                                    --------                                                                                  45, 745,33
Gross amount expended-__--- -------   -----------------------                                                                 40, 67.16

      Balance unexpended June 30, 1937------------------------                                                                 5, 068. 17
Outstanding liabilities June 30, 1937 ---------------------------                                                                 954.75
     Balance available June 30, 1937___---- - ____--------- _                                                                  2,113. 42
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937 -----------------------------------                                                                   35, 000. 00

Balance available for fiscal year 1938__-------                                        ------              __-     ___        37, 113.42

Amount that can be profitably expended in fiscal year ending June
                                 - - ---- - - -- - - -
30, 1939, for maintenance __      ____                                                                                       25, 000. 00
1
   Exclusive of available funds.

13. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                      [Commercial statistics for these projects are given in pt. 2 of the report]

                                                                    For last            Cost and expenditures to              Estimated
                                                                   full report                June 30, 1937                   amount
                     Name of project                              see Annual                                                   quired re-
                                                                                                                               quired to
                                                                      Report
                                                                       for-            New work            Maintenance         cmplte

Lower San Francisco Bay, Calif------------------                       1935                                                    1$300,    000
Monterey Harbor, Calif....................-----------------------      1935                 $652, 951     --------------           (8)

  1 Not including $260,000 to be contributed by local interests for expenditure on the work.
  I Includes $207,800 Public Works funds.
  3 Completed.

       14. PLANT ALLOTMENT FOR SAN FRANCISCO, CALIF., DISTRICT

                                             Cost and financial summary
Undistributed costs June 30, 1937_ ______-------------__                                                           _ 1$1, 3t9, 346. 27
Plus accounts receivable June 30, 193____----------- ------                                                        _       94, 058. 45

      Gross total costs to June 30, 1937-----------------                                                                 1, 453, 404. 72
Minus accounts payable June 30, 1937--------------------                                                                      62, 112.86

      Net total expenditures----------------------------                                                                  1, 391, 291.86
Unexpended balance June 30, 1937_____________       __--                                                                     349, 775.75
           Total amount appropriated to June 30, 1937_ ___________                                                        1, 741,067.61

       Fiscal year ending June 30                    1933             1934                  1935                 1936             1937


Total expended.-.........
                    - - - - - ...........                               .            $1, 077, 635. 41        -$90, 243. 28      $403, 899. 73
Allotted .........
                 . .............                                                       1,189, 855. 57         622, 571. 95      -71,359. 91

      1 Includes $428,077.27. cost of constructing hopper dredge Paciflo.
    RIVERS AND HARBORS--SAN FRANCISCO, CALIF., DISTRICT                                             1449
Balance unexpended July 1, 1936--------------------------- $825,035.39
Amount allotted from War Department Appropriation Act ap-
proved April 9, 1935------------------------ ------------------ 25, 000. 00

     Amount to be accounted for___-------------------         850, 035. 39
Deductions on account of revocation of allotment--------------96, 359.91

       Net amount to be accounted for .          ___-------------
                                               -___                                        753, 675. 48
Gross amount expended___________-------------       $1, 191,777. 80
Less--
    Reimbursements collected------ -- $740,130. 50
    Receipts from sales--------------47, 747. 57
                                                          787, 878. 07
                                                                                           403, 899.73

Balance unexpended June 30, 1937 --------------------------                                349, 775.75
Outstanding liabilities June 30, 1937----------     $28, 648. 41
Amount covered by uncompleted contracts --------    313, 603. 60
                                                                                           342, 252.01
Balance available June 30, 1937_______--- __--------______                                   7, 523. 74
Accounts receivable June 30, 1937----------------------------                               94, 058. 45

         Unobligated balance available June 30, 1937__-                           ___-     101, 582.19

                     15. EEL RIVER, CALIF.-FLOOD CONTROL

   Location.-The works covered by this project are located in the
lower 15 miles of the Eel River, Calif.
   Existing project.-This provides for the construction of current
retards and levees to protect the agricultural community in the Delta
section. The estimated cost for new work is $144,000. The project
was adopted by the Flood Control Act of June 22, 1936 (H. Doc. No.
194, 73d Cong., 2d sess.). The latest published map is in the above
document.
  Local cooperation.-See page 6.
   Conditio at end of fiscal year.-- ork has not been started.
   Proposedoperations.-No funds are available and no work is pro-
posed during the fiscal years 1938 and 1939 due to nonfulfillment of
conditions of local cooperation.
                                 Cost and financial summary
Amount appropriated to June 30, 1937_______
Amount (estimated) required to be appropriated for completion of
existing project   -----------------------------------------    $144,000

Status of reports called for by river and harbor acts and committee resolutions

        Locality           Authorization act      Transmitted         Document no.         Recommenda-
                                                  to Congress                                  lion

Belvedere Cove, Calif. __ Senate committee res-Dec. 10, 1936 .------------------  Unfavorable.
                           olution,  July 31,
                          1935.
Belvedere Harbor, Calif_ Rivets and Harbors     ... do---- ------------------------ Do.
                          Committee resolu-
                          tion, Aug. 23, 1935.
Benicia Harbor, Solano River and Harbor ....................................
  County, Calif.           Act, Aug. 26, 1937.
Berkeley Harbor, Calif.- Rivers and Harbors       Jan. 21, 1937 .................-------      Do.
                           Committee resolu-
                           tion, Feb. 11, 1936.
1450         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

     Status of reports called for by river and harbor acts and committee
                             resolutions-Continued

        Locality                         Authorization act      Transmitted
                                                                to Congress            Document no.           Recommenda-
                                                                                       Document no.               tion
                                                                    to Congress                                      tion

Bodega Bay, Calif -_-_           Rivers and Harbors
                                    Committee resolu-
                                   tion, Mar. 20, 1936.
Carquinez Strait, at or          Rivers and Harbors
near Benicia, Calif.              Committee resolu-
                                   tion, Apr. 30, 1936.
Corte Madera       Creek,        Rivers and Harbors             June 21,1937                                  Unfavorable.
Calif.                            Committee resolu-
                                   tion, Jan. 14, 1936.
Crescent City Harbor,            Senate committee res-          Mar. 25, 1937     Senate   committee          Favorable.
  Calif.                           olution, Apr. 1, 1936.                           print, 75th Cong.,
                                                                                    1stsess.
    Do--   - - -
           _-            -       Senate committee res- .....
                                                           d o . -- - -           ____do ___---- --- -.           Do.
                                   olution, Mar. 12,
                                   1936.
Humboldt Harbor and              Rivers and Harbors Dec.. 10, 1936                Rivers and Harbors              Do.
Bay, Calif.                       Committee resolu-                                Committee, 11, 75th
                                   tion, June 3, 1935.                              Cong., 1st sess.
Monterey Harbor, Calif_          River and Harbor
                                   Act, Aug. 26, 1937.
Noyo River, Calif., in-      -   -   -         ---------
                                      do ... ---
                                         -   -

cluding     harbor   at
mouth of.
Palo' Alto Harbor, San River and Harbor            Dec. 28, 1936                                              Unfavorable.
  Francisco Bay, Calif.       Act, Aug. 30, 1935.
Richardson Bay, Calif___ ---     do_--
Richmond Harbor, Calif. Rivers and Harbors
                               Committee resolu-
                              tion, May 10, 1937.
Russian River, Calif ...   River and Harbor Jan.          5, 1937                                                 Do.
                              Act, Aug. 30, 1935.
San Francisco Harbor, Rivers and Harbors Dec. 10, 1936                             Rivers and Harbors         Favorable.
  Calif.                      Committee resolu-                                      Committee, 12, 75th
                              tion, Mar. 26, 1936.                                   Cong., 1st sess.
    D o ....        . ... Senate committee res- .....  do ..-.                    --   do _   --      -_-         Do.
                              olution, Mar. 24,
                              1936.
San    Lorenzo    River,     River and Harbor
  Calif.                      Act, Aug. 26, 1937.
Sonoma Creek, Calif_...          do _-- _
Southampton Bay, Calif. River and Harbor           Jan. 18, 1937                                            .. Unfavorable.
                              Act, Aug. 30, 1935.



   IMPROVEMENT OF RIVERS AND HARBORS IN THE
          SACRAMENTO, CALIF., DISTRICT
   This district embraces the drainage basins of Suisun Bay, the Sac-
ramento and San Joaquin Rivers and their tributaries, and those
parts of southern Oregon and of northwestern Nevada which con-
stitute that portion of the Great Basin that tends to drain toward
central Nevada.
   District engineer: Col. L. B. Chambers, Corps of Engineers.
   Division engineer: Col. T. H. Jackson, Corps of Engineers,
through August 31, 1936; Col. John J. Kingman, Corps of Engi-
neers, since that date.
                                                        IMPROVEMENTS

                                                             Page                                                           Page
1. San Joaquin River, Calif                                  1451  7.      Suisun Bay Channel, Calif                        1466
2. Stockton and Mormon Chan-
     nels (diverting canal), Calif_
                                   -

                                                                   8.
                                                             1455 9.
                                                                           Suisun Channel, Calif
                                                                           Old River, Calif-----------
                                                                                                            ------          1467
                                                                                                                            1469
3. Mokelumne River, Calif .                        --        1457 10.      Examinations, surveys, and
4. Sacramento River, Calif -.-                               1459            contingencies (general)___                     1471
5. Feather River, Calif .    ------                          1463 11.      Plant allotment_------------                     1471
6. Middle River and connecting
       channels, California                      ----        1464
             RIVER AND HARBORS-SACRAMENTO,                                               CALIF., DISTRICT                  1451

                                       1. SAN JOAQUIN RIVER, CALIF.

   Location.--San Joaquin River rises in the Sierra Nevada and flows
317 miles westerly and northerly to Suisun Bay.
   Existing project.-This provides for a channel 30 feet deep at
mean lower low water and for channel-bottom widths of 400 feet
below Criminal Point and 225 feet above that point, from the mouth
of New York Slough to Mormon Channel at Stockton, a distance
of 40 miles (suitably widened at bends and at the entrances to New
York Slough and to channels through shoals, with levees set back
230 feet from the center of the channel); for a channel 26 feet deep
and 100 feet wide thence to Edison Street, three-fourths mile; for a
9-foot depth thence to the head of navigation at El Dorado Street,
one-half mile; for a 9-foot depth in Fremont Channel and McLeod
Lake, arms of Stockton Channel; and for a channel 9 feet deep and
100 feet wide in Mormon Channel from its mouth to Center Street,
head of navigation, 1.7 miles. It also provides for suitable passing
basins and a turning basin at Stockton; for a triangular-shaped set-
tling basin 30 feet deep and average side length of about 1,000 feet
il the San Joaquin River just above its junction with the Stockton
deep-water channel and a second settling basin 30 feet deep, 1,200
feet long, and 100 feet wide, adjoining the deep-water channel at
the mouth of Calaveras River; for the reconstruction to grade and
section of approximately 4,000 feet of levee along the north side of
Venice Island Cut, and the setting back of levees where required for
the channel improvements; for cutting off sharp bends and making
cut-offs in the river; for partial closing of side channels at Lairds
Slough and Paradise Cut by weirs to confine the low-water flow to
one main channel; and for snagging, removing overhanging trees,
and constructing brush wing dams from the mouth of Stockton Chan-
nel to Hills Ferry, 86 miles, to facilitate light-draft navigation on
this part of the river during higher stages of water. The following
table shows the tide and flood conditions prevailing:
                                                      San Joaquin River

                                                                         Miles                       Range in feet
                                                                         from
                               Place                                     mouth
                                                                          of         Mean        Extreme Ordinary         Extreme
                                                                         river       tidal 1        tidal       flood      flood

Collinsville -------------------------------------                          0            5. 8            7.0       8. 0         9.   9
Mouth, Stockton Channel ...                  ...------------------         38. 5         3. 2           4. 5       8. 5        13.   7
San Joaquin Bridge -                -.-..............                .     54. 5         1. 1            1. 5     17. 0        21.   0
Hills Ferry.............-----------------------------------.....          124.5 --------------------.......       12. 0        16.   0

  I Mean lower low water to mean higher high water.

  The estimate of cost for new work, revised in 1937, is $5,455,000.
This amount includes $1,307,500 contributed by local interests toward
the cost of dredging. The latest (1937) approved estimate of annual
cost of maintenance is $181,000 during the first year and $111,000
annually thereafter.
  The existing project was authorized by the following river and
harbor acts: The acts of August 14, 1876; March 3, 1881; July 5,
1884; August 11, 1888; July 13, 1892; August 18, 1894; and June 3,
1452    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,        1937


1896; provided for cutting off sharp bends and making cut-offs in
San Joaquin River below the mouth of Stockton Channel, dredging
Mormon Channel, snagging, removing obstructions, and constructing
wing dams in San Joaquin River from Stockton Channel to Hills
Ferry, and the partial closing of side channel at Laird Slough and
Paradise Cut, without adopting any specific dimensions; the act of
June 25, 1910, provided for the 9-foot channel up to Stockton (H.
Doc. No. 1124, 60th Cong., 2d sess.) ; the act of July 25, 1912, pro-
vided for the improvement of Fremont Channel and McLeod Lake
(H. Doc. No. 581, 62d Cong., 2d sess.); the act approved January
21, 1927, provided for the 26-foot project (H. Doc. No. 554, 68th
Cong., 2d sess.); the Public Works Administration, September 6,
1933, and the act of August 30, 1935, provided for the original 30-
foot channel (Senate Committee Print, 73d Cong., 1st sess.); and
the act of August 26, 1937, provided for the widened 30-foot channel
 (Rivers and Harbors Committee Doc. No. 15, 75th Cong., 1st sess.).
The latest published maps are in House Documents No. 332, Sixty-
fifth Congress, first session, No. 554, Sixty-eighth Congress, second
session, and Rivers and Harbors Committee Document No. 15,
Seventy-fifth Congress, first session.
   Local cooperation.-Local interests are required to furnish, free of
cost to the United States, suitable areas for the disposal of dredged
material during initial construction and future maintenance, and
necessary rights-of-way, and shall assume the maintenance of levees.
All requirements for work done to date have been fulfilled.
   Terminal facilities.--There are a number of privately owned river
freight warehouses along the river and in the delta region. Freight
is handled on the bank, except at and below Antioch, where extensive
wharves and warehouses exist. The city of Stockton port terminal
has 3,400 linear feet of public wharves served by a public belt rail-
road. All, except a 30-foot oil terminal pier and a 508-foot wharf,
have transit sheds. In addition to privately operated grain and lum-
ber terminals, a cotton compress and warehouse, a bean cleaning
plant, oil refinery, and bank of silos for cement storage, there are
numerous publicly and privately owned shallow-draft wharves at
Stockton. In New York Slough there are 13 wharves, including 1
for deep-sea vessels. One wharf has a spur track and two have oil
pipe lines. The terminal facilities are adequate.
   Operationsand results during fiscal year.-Maintenance: The Gov-
ernment hydraulic pipe-line dredge San Joaquin excavated 83,030
cubic yards from the main river near the mouth of Stockton Channel
in June 1937 at a cost of $8,552.76. Government plant and hired
labor were used to prepare several spoil areas before dredging and to
level the areas and remove pipe lines after dredging at a cost of
$6,450.49. Miscellaneous surveys, inspections, and other maintenance
were done by hired labor at a cost of $5,568.58.
   A hydraulic pipe-line dredge working under contract excavated
537,215 cubic yards from Stockton Channel and the main river at a
cost of $99,470.29.
   Clamshell dredging plant working under contract on an hourly
basis excavated 131,675 cubic yards from the main river between the
mouth of Stockton Channel and a point 17 miles upstream at a cost
of $12,531.93, including $1,250 contributed funds, and excavated
74,375 cubic yards from nonproject tributaries as an aid to existing
           RIVER AND HARBORS-SACRAMENTO,                                                              CALIF., DISTRICT                 1453
navigation, under section 3 of the River and Harbor Act of July 3,
1930, at a cost of $7,186.72.
   Total costs for the year were $138,510.77 and total expenditures
$128,876.17, all for maintenance. In addition $1,250 contributed funds
were expended for maintenance and additional costs.
   Condition at end of fiscal year.-Tlhe existing project is 81 percent
complete, the work remaining to be done being the dredging of a
9-foot channel in Mormon Channel to Center Street, Stockton, and
the new items of the revised (1937) project, including widening of
30-foot channel to Stockton; construction of two settling basins;
restoration of levee on north side of Venice Island Cut; and setting
back of levees where needed. The controlling depth from Suisun
Bay to Mormon Channel, 40 miles, is 30 feet; thence to Edison Street,
three-quarters of a mile, 26 feet; and thence to head at El Dorado
Street, one-half mile, 9 feet. A 4-foot depth is available in Mormon
Channel and 9 feet in Fremont Channel and McLeod Lake.
   The river, from its junction with Stockton Channel to Hills Ferry,
usually has a controlling depth of 41/2 feet from April to June, inclu-
sive. Navigation in this section above the San Joaquin bridge
 (Southern Pacific Railroad crossing) is impracticable in the low
stages after June.
   The costs have been as follows:

                                   Funds                                                 New work           Maintenance              Total

United States funds:
   Regular appropriation ......--------------------------                                $1, 971, 221. 89     $1, 178, 799. 23    $3, 150, 021. 12
   Public Works funds...------    -----------------------                                 1,158,347.99      .....-----------...    1, 158, 347.99
     Total United States funds......-----------------------                               3, 129, 569. 88      1, 178, 799. 23     4, 308, 369. 11
Contributed funds_ ---------------------------------                                      1, 307, 500. 00           1, 250. 00     1, 308, 750. 00
      Total all funds.................................-------------------------------.    4, 437, 069. 88      1, 180, 049. 23     5, 617, 119. 11



   The total expenditures were $4,299,156.74, including $1,158,347.99
from Public Works funds, of which $207,197.64 was for 30-foot chan-
nel in Suisun Bay. In addition $1,307,500 was expended from con-
tributed funds for new work and $1,250 for maintenance.
   Proposedoperation.-The balance unexpended July 1, 1937, amount-
ing to $21,195.55, including accounts receivable, together with allot-
ments totaling $151,000 made in July 1937, will be applied as follows:
Accounts payable ----------                                   ----                        ---------                          _    $8, 508. 17

Maintenance:
    Dredging 9-foot channel in Stockton Channel, above Edison Street,
      Stockton, in Mormon and Fremont Channels, and McLeod Lake,
      by clamshell dredge under contract, July 1937 to June 1938__.    2, 000. 00
    Dredging 30-foot channel in Stockton Channel and in San Joaquin
      River below the mouth of Stockton Channel, total distance 40
      miles, by Government pipe-line dredge, September to Decem-
      ber 1937---------------------------- --------------------- 50, 000. 00
    Dredging various shoals in 30-foot chanel to Stockton by Govern-
      ment hopper dredge, September and October 1937-___---_--      - 10, 000. 00
    Removing shoals by clamshell dredge, between Stockton Channel
      and Southern Pacific Co. Lathrop Bridge, 16 miles upstream, by
      contract, September 1937-- ----- --- ----     __------------     5, 000. 00
1454       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Maintenance--Continued.
    Snagging in main river, above and below Stockton Channel, by
      Government plant, after freshets---------------------------    $3, 000. 00
    Dredging in tributary channels by clamshell dredge under con-
      tract, August and September 1937 and June 1938-----         __ 10, 687. 38

         Total for maintenance-----------------------------------80, 687. 38

         Grand total                                                             89, 195. 55
    Balance available                   --------------------------               83, 000.00

       Total ---------------------------------                                  172, 195 55
  The balance available July 1, 1938, amounting to $83,000, together
with an additional sum of $1,015,000, can be profitably expended dur-
ing the fiscal year 1939, as follows:
New work:
   Dredging Mormon Channel from its mouth to Center Street,
     Stockton, to a depth of 9 feet, under contract, July to Decem-
     ber 1938-------------------------                                ----        $135, 000
   Dredging a settling basin 30 feet deep in the San Joaquin River
     just above its junction with the deep-water channel, near
     Stockton, by contract hydraulic dredge, August 1938 to June
     1939 -----------------------------------------------------                     90, 000
   Dredging a settling basin 30 feet deep in the Calaveras River just
     above its junction with the deep water channel, by contract
     hydraulic dredge, August 1938 to June 1939 ___                                  60, 000
   Bringing to grade and section 0.76 mile of levee on the northerly
     side of Venice Island Cut, by contract, July 1938 to June 1939__               26, 000
   Widening 30-foot channel between Stockton and Criminal Point
     to general width of 225 feet, dredging by contract and by
     Government plant and hired labor, August 1938 to June 1939__                  330, 500
   Widening 30-foot channel between Criminal Point and mouth of
     New York Slough to general width of 400 feet, dredging by con-
     tract and by Government plant and hired labor, August 1938 to
     June 1939 --                                                                  333, 000
                                                                                   3---------------------------
   Setting back levees where required for channel improvements,
     between mouth of New York Slough and Stockton, by contract,
     August 1938 to June 1939 .....................             __43,                    500
            Total for new work_                                                  1, 018, 000;

Maintenance :
   Dredging 9-foot channel in Stockton Channel, above Edison
      Street, Stockton, in Mormon and Fremont Channels, and Mc-
      Leod Lake, by clamshell dredge under contract, July to De-
      cember 1938-------------------------------                                      2,000
   Dredging 30-foot channel in Stockton Channel and in San Joaquin
      River below the mouth of Stockton Channel, total distance 40
      miles, by Government pipe-line dredge, July to December 1938_                  53, 000
   Dredging various shoals in 30-foot channel to Stockton by Gov-
      ernment hopper dredge, September and October 1938__________                    10. 000
   Removing shoals by clamshell dredge, between Stockton Channel
      and Southern Pacific Co. Lathrop Bridge, 16 miles upstream,
       by contract, September 1938_ _                         _    __       -         3,000
    Snagging in main river, above and below Stockton Channel by
      Government plant after freshets _                                               7, 000
    Dredging in tributary channels by clamshell dredge under con-
      tract, August 1938 and June 1939 ________ ___ __________                        5,000
            Total for maintenance_               ___--____-_____   __     ___        80, 000
            Total application of funds--                 ______________________ 1, 098. 000
          RIVER AND HARBORS-SACRAMENTO,                                                CALIF., DISTRICT                                1455
                                       Cost and financial sumntary

Cost of new work to June 30, 1937                                $-----------------------
                                                                13,  129, 569. 88
Cost of maintenance to June 30, 1937----- ---------------------   1, 178, 799. 23

        Total cost of permanent work to June 30, 1937                                        ----             ___      2   4, 308, 369. 11
Undistributed costs June 30, 1937---------------------------                                                                    -04.     20
      Net total cost to June 30, 1937-------------------------                                                             4, 307, 664. 91
Minus accounts payable June 30, 1937-------------------------                                                                   8, 508. 17
     Net total expenditures___------------------------- -----                                                        1 24, 299, 156. 74
Unexpended balance June 30, 1937_ -                                                                                         21, 195. 55
        Total amount appropriated to June 30, 1937------------ 124, 320, 352. 29

   Fiscal year ending June 30             1933              1934                      1935                      1936              1937


Cost of new work----------------       $287, 135. 09 $1, 017, 747. 09       $143, 272. 52                --
Cost of maintenance------- ------        64, 140. 66     109, 017. 31         72, 967. 62                     $78, 624. 23      $138, 510.77

     Total cost      ---       . .-     351, 275. 75   1, 126, 764. 40           216, 240. 14                  78, 624. 23       138, 510. 77

Total expended---------------- 466, 547. 30            1, 084, 357. 61           220, 648. 96                 108, 341. 31       128, 876. 17

Allotted___          ________           575, 887. 74   1, 230, 481. 29            72, 181. 26                 117, 000. 00        31, 000. 00


Balance unexpended July 1, 1936_----                                                                                         $119, 071. 72
Amount        allotted     from War           Department                Appropriation                         Act
  approved May 15, 1936-                         --        ---                                      --                         31, 000. 00

      Amount to be accounted for                                          -----                                                50, 071. 72
Gross amount expended                                  -                               $133, 155.28
Less reimbursements collected __                                                          4, 279. 11
                                                                                                                              128, 876. 17

      Balance unexpended June 30, 1937                                                 --            ---                       21, 195. 55
Outstanding liabilities June 30, 1937                              --      ---               $8, 049.22
Amount covered by uncompleted contracts-                                         --              458. 95
                                                                                                                                8, 508. 17
     Balance available Juine 30, 1937                                                                         _12,                687. 38
Amount allotted for fiscal year 1938___                                                                                       151,000. 00
        Balance available for fiscal year 1938-------------------                                                             163, 687. 38
Amount (estimated) required to be appropriated for completion
   of existing project 3--------------                                                                                       935, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 3-_.         .---                  -                                                                         935, 000. 00
     For maintenance 3---------------------------------------                                                                  80, 000. 00

        Total 3-_-       ______-__-_
                                  _                                                                                        1, 015, 000. 00
               $1,158,347.99      Public Works funds.
  2'Includes
     In addition $1,307,500 for new work and $1,250,000 for maintenance were expended
from contributed funds.
   I Exclusive of available funds.



2. STOCKTON AND MORMON CHANNELS                                          (DIVERTING CANAL),                                      CALIF.

  Location.-This is an artificial cut located about 2 miles northeast
of Stockton. (See U. S. Geological Survey Sheet, Stockton Quad-
rangle.)

        20196-37-pt. 1--92
1456     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for diverting the waters of Mor-
mon Slough before reaching Mormon and Stockton Channels by
means of a dam in the slough 3 miles east of Stockton, and a canal
150 feet wide, with average cut of 7.9 feet, thence to the north branch
of the Calaveras River, 4.63 miles; by the enlargement of the cross
section of this branch to 1,550 square feet, thence to its mouth at the
San Joaquin River, 5 miles; and by the construction of a levee along
the west side of the canal and the south side of the north branch of
the Calaveras River from the material excavated. The height of the
levee is limited by necessary railway and highway crossings to about
3 feet above the contemplated flood surface. The canal is empty
during the greater part of the year, but at times of extreme flood
there is a depth of about 12 feet, and at ordinary flood a depth of
about 10 feet.
   The estimate of cost for new work, revised in 1906, was $280,395.
The latest (1918) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was authorized by the River and Harbor Act
of June 13, 1902 (H. Doc. No. 152, 55th Cong. 3d sess., and Annual
Report for 1899, p. 3188). The latest pubhshed map is in House
Document No. 256, Sixty-third Congress, first session.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-See report on San Joaquin River, Calif.
   Operations and results during fiscal year.-Hired labor cleared the
channel of brush, snags, and other obstructions at a cost of $2,489.92.
Surveys and inspections cost $374.07. Total costs were $2,863.99 for
maintenance; total expenditures, $2,912.15.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1910 at a saving of $27,244 under the estimated cost. Most
of the silt formerly deposited in Stockton and Mormon Channels
is diverted therefrom by this canal, thereby obviating serious incon-
veniences to navigation and the expensive annual dredging.
   The total cost was $345,837.27, of which $253,151.03 was for new
work and $92,686.24 for maintenance. Total expenditures were
$345,775.47.
   Proposed operations.-The balance unexpended July 1, 1937,
amounting to $415.41 (after deducting a revocation of $1,000 made
in July 1937), will be applied during the fiscal year 1938 to payment
of accounts payable, $38.54, and to maintenance for removal of brush,
overhanging trees, and other obstructions from the channel and banks
of both sections of the diverting canal, by Government plant, in April
and May 1938.
   The additional sum of $5,000 can be profitably expended for main-
tenance during the fiscal year 1939, as follows:
Removal of brush, overhanging trees, and other obstructions from the
  channel and banks of both sections of the diverting canal, by Govern-
  ment plant, October to December 1938                                    000
                                                                        $---------------
Dredging deposits of silt from the Calaveras section of the diverting
  canal, by contract, December 1938---------------------------------- 2, 000

       Total -------------------------------------------------------    , 000
                  RIVER AND HARBORS-SACRAMENTO, CALIF., DISTRICT                                                                   1457
                                                              Cost and financial summary
Cost of new work to June 30, 1937------------------------------                                                        $253, 151. 03
Cost of maintenance to June 30, 1937 ---------------------                                                    ----       92, 686. 24

      Total cost of permanent work to June 30, 1937_-----------                                                         345, 837. 27
Undistributed costs June 30, 1937----------------------------                                                              -23. 26

      Net total cost to June 30, 1937             ---            345, 814. 01
Minus accounts payable June 30, 1937----------------------------       38. 54

     Net total expenditures_------_______                                                                               345, 775. 47
Unexpended balance June 30, 1937 -------------------------------                                                          1, 415. 41

                                                        ------
               Total amount appropriated to June 30, 1937______                                                         347, 190. 88

               Fiscal year ending June 30                              1933         1934          1935          1936               1937

Cost of new work.ce _._-..
Cost of maintenance -------------------                              $6, 704. 01    $899. 54    $1, 998. 44   $2, 947. 13
                                                                                                                                -$2, 863.- 99
Total expended---.---------------------                               7, 328. 02     959. 05     1,995. 34     2, 840. 27          2,912. 15
Allotted............-----------------------------..........           4, 425. 34   4, 703. 73      966.81      5,000. 00         -2, 000. 00


Balance unexpended July 1, 1936---------------------------------                                                            $6, 327.56
Deductions on account of revocation of allotment ----------------                                                            2, 000. 00

      Net amount to be accounted for-------------------------                                                                4, 327. 56
Gross amount expended----------------------------- $3, 071. 42
Less reimbursements collected __-__------__- -- _      159. 27
                                                                                                                                2, 912. 15
      Balance unexpended June 30, 1937___-___-_______                                                         -__               1, 415.41
Outstanding liabilities June 30, 1937------------------                                                                             38. 54

     Balance available June 30, 1937.__---       -__      -- ____                                                               1, 376. 87
Amount that can be profitably expended in fiscal year ending June
30; 1939 for maintenance------------------5,                                                                                     000. 00
1Exclusive of available funds.
                                                     3. MOKELUMNE RIVER, CALIF.

   Location.-This river rises near the crest of the Sierra Nevada and
empties into the San Joaquin River 20 miles above the mouth of the
latter. (See U. S. Geological Survey "Topographic Map of the
Sacramento Valley, Calif.")
   Existing project.-This provides for the removal of snags and ob-
structions and occasional dredging of shoals from the mouth of the
river to Galt-New Hope Bridge, a distance of 35 miles, including both
forks. The mean lower low water depths considered sufficient for
needs of navigation are as follows:
                                                                  Mokelumne River

                                           Location of section going upstream                                       Depth         Length

                                                                                                                     Feet          1li/ler
Mouth of river to lower junction North and South Forks----------------------------                                          9                4
Lower junction North and South Forks to Snodgrass Slough via North Fork........                                             9                8
Snodgrass Slough to upper junction North and South Forks via North Fork--...-...                                            6                1
Lower junction North and South Forks to upper junction of same at New Hope Land-
ing via South Fork ------------------------------------------------------ 9                                                                 14
New Hope Landing to Galt-New Hope Bridge------................................. 3                                                            8
1458         REPORT OF CHIEF OF ENGINEERS, U...                       ARMY, 1937

   At low-river stages the range between mean lower low water and
mean higher high water at the mouth is 4 feet, with extreme tidal
range of 5 feet; there is no tide at the upper end, just above Galt-New
Hope Bridge. Ordinarily flood fluctuation is 5.5 feet at the mouth
and 12 feet at the upper end. Extreme flood fluctuation is 8 feet at
the mouth and 17 feet at the upper end.
   The estimate of cost for new work, made in 1881, was $8,250. The
latest (1930) approved estimate for annual cost of maintenance is
$2,000.
   The existing project was adopted by the River and Harbor Act of
July 5, 1884 (Annual Report for 1882, p. 2637). For latest pub-
lished map see House Document No. 1160, Sixty-third Congress,
second session.
   Terminal facilities.-The Western Pacific Railroad has a ware-
house at Terminous, on Potato Slough; otherwise commodities are
handled on landings or on the banks at various points. The facilities
are considered adequate.
   Operations and results dur'ing fiscal year.-Clamshell-dredging
plant, working under contract on an hourly basis, excavated 40,968
cubic yards from the north fork of the river, between the mouth of
Snodgrass Slough and New Hope Landing, at a cost of $5,062.74, for
maintenance. The expenditure was $4,870.85.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1885. Controlling depths are as shown in the table under
"Existing project", except in the first section, where 11 feet is the
controlling depth. The channel is reasonably free of obstructions to
the head of navigation, except for a few that usually develop at low-
water stages in the fall. Total costs were $72,579.64, of which $8,500
was for new work and $64,079.64 for maintenance. Total expendi-
tures were $72,387.75.
   Proposed operations.-The balance unexpended July 1, 1937,
amounting to $249.57 (after deducting a revocation of $200 made in
July 1937), together with an allotment of $1,000 made during July
1937, after paying accounts payable, $191.89, will be applied to main-
tenance in September 1937 for removing snags, overhanging trees,
and other obstructions, by Government plant.
   The additional sum of $2,000 can be profitably expended for main-
tenance during the fiscal year 1939, as follows:
Dredging sand bars and shoals by contract, July 1938 ..--.           $1, 200
Removing snags, overhanging trees, and other obstructions by Govern-
  ment plant, September 1938---------------------------------------      800

     Total---__               ----------------                                         2,000


                                Cost and financial stnmmary
Cost of new work to June 30, 1937--------------------------------                  $8,500
Cost of maintenance to June 30, 1937_                    -------       __          64,079. 64

       Total cost of permanent work to June 30, 1937-----------                    72,579. 64
Minus accounts payable June 30, 1937----                   -------          ----      191. 89

       Net total expenditures-------------------------------------_
                                       _                                           72, 387. 75
Unexpended lbalance June 30, 1937_.                --                                 449. 57

       Total amount appropriated to June 30, 1937_ _                               72, 837. 32
            RIVER AND HARBORS-SACRAMENTO,                                     CALIF., DISTRICT               1459

          Fiscal year ending June 30                 1933         1934           1935         1936           1937


Cost of new work---.----------....                                                           -
Cost of maintenance-          ------------------   $1,637.56    $9, 927.80 ------------     $2, 991. 54     $5, 062. 74
Total expended--_---------------------              , 637. 56   9, 927. 80                   2, 991. 4       4, 870. 85

Allotted-------          ----------------------     1,998.32    11, 579. 00    $1,000. 00    2,000.00        3,300.00


Balance unexpended July 1, 1936___-----------------            $2, 020.42
Amount allotted from War Department Appropriation Act approved
May 15, 1936-----------------------------------        ----    3, 300. 00

          Amount to be accounted for--                                                        --          5, 320. 42
Gross amount expended                      ------------------------------------                           4, 870. 85

     Balance unexpended June 30, 1937----------------------------449.     57
Amount covered by uncompleted contracts----------------------        191. 89

     Balance available June 30, 1937-----------------------------                                           257. 68
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------------------------------------                                           1,000. 00

          Balance available for fiscal year 1938------------------------1,257. 68

Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance ----------------------------------------                                           2,0X).00
   ' Exclusive     of available       funds.

                                     4. SACRAMENTO RIVER, CALIF.

   Location.-This river is formed by numerous streams draining the
Trinity and Warner Mountains in northern California and empties
into Suisun Bay at Collinsville. (See U. S. Geological Survey topo-
graphic map of the Sacramento Valley, Calif.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1875, August 2, 1882, December 21, 1889, July 13, 1892, and
August 18, 1894. The cost and expenditures thereunder prior to
commencement of operations under the existing project in 1899 were
$738,918.14, of which $185,198.19 is estimated as for new work and
$553,719.95 for maintenance. For further details see page 1985.
Annual Report for 1915.
   Existing project.-This provides for a channel 10 feet deep at mean
lower low water and 150 to 200 feet wide from the mouth of the
river to Sacramento, 59 miles; thence 6 feet deep at low water to
Colusa, 86.2 miles; thence 5 feet deep at low water to Chico Landing,
51.3 miles; and such depths as practicable thence to Red Bluff, 52.4
miles. Below Sacramento the results are to be obtained by means of
wing dams, supplemented by dredging. Above Sacramento the re-
sults are to be obtained by removal of snags and concentration of the
channel by temporary works and stream-flow regulation by Kennett
Reservoir upon its completion.
1460               REPORT OF CHIEF OF ENGINEERS, U. ,S. ARMY, 1937

      The following table shows the tidal and flood conditions prevailing:
                                                                Sacramento River


                                                                                       Miles                   Range in feet
                                                                                       from
                                    Place
                                                                                      mouth       Mean       Extreme Ordinary Extreme
                                                                                      of river    tidal 1     tidal   flood    flood

Collinsville...................................------------------------------------           0       5. 8       7. 0          8     9. 9
                     ._
Sacramento -----------------------------------                 _.                         59. 0      22. 0       3. 0          20   30. 0
          - - - - ............
Vernon-........                                      .....        .-.......               79. 3 ..........     Trace           20   24. 0
Colusa ..........................--------------------------------------.                 145. 2 -------------.                 25   32. 0
Chico Landig             --------------------------------                                196. 5 --------------------..         20   25. 0
Red Bluff....
            --------- -              ---------------------                               248. 9    ...-------..... .           24   29. 0


   1 Mean lower low water to mean higher high water.
   2 Tide at low-water season only.


   The estimate of cost for new work, revised in 1935, is $12,588,000,
exclusive of amounts expended on previous projects on the Sacra-
mento River below Sacramento. The latest (1935) approved esti-
mate for annual cost of maintenance is $215,000.
   The existing project was adopted by the following river and harbor
acts: The act approved March 3, 1899, provided for a depth of 7
feet below Sacramento (H. Does. No. 186, 55th Cong., 2d sess., and
No. 48, 55th Cong., 3d sess.); act of July 25, 1912, provided for the
work above Sacramento (H. Doc. No. 76, 62d Cong., 1st sess.); act of
January 21, 1927, provided for the 10-foot channel (H. Doc. No. 123,
09th Cong., 1st sess.); and the act of August 30, 1935, provided for a
depth of 6 feet between Sacramento and Colusa and 5 feet between
Colusa and Chico Landing, at a cost of $390,000, provided the flow of
the river is increased to the minimum flow of 5,000 cubic feet per sec-
ond after Kennett Reservoir is built. The River and Harbor Act of
August 30, 1935, authorized a special direct participation of the Fed-
eral Government of $12,000,000 in the cost of the Kennett Dam.
 (Rivers and Harbors Committee Doc. No. 35, 73d Cong., 2d sess.).
For latest published maps of the section below Sacramento see House
Document No. 1123, Sixtieth Congress, second session; and of the sec-
tion above Sacramento, House Document No. 76, Sixty-second Con-
gress, first session.
   Recommended modifications of project.-In House Document No.
1893, Sixty-fourth Congress, second session, it was recommended that
Chico Landing, 52.4 miles downstream from Red Bluff, be made the
head of the improvement.
   Terminal facilities.-At Sacramento there are 4,810 linear feet of
wharves, of which 1,850 linear feet are owned by the city and 420
linear feet are open to general public use. There are 245,700 square
feet of warehouse space, of which 103,700 square feet are owned by
the city and 21,000 square feet are open to general public use.
   On the west bank, opposite Sacramento, are four wharves of a
total length of 350 feet, with 108,560 square feet of warehouse space,
all privately owned and used. Between Sacramento and Chico Land-
ng there are 47 warehouses and numerous small landings. Freight
is also handled on the bank. Between Sacramento and the mouth of
       RIVER AND HARBORS-SACRAMENTO,              CALIF., DISTRICT    1461
the river there are, in addititon to 1,440 linear feet of wharf with
warehouse facilities at Rio Vista, 19 large wharves, about 38 large
warehouses, and many small warehouses and landings, all owned and
operated by private interests. The facilities are considered adequate.
   Operations and results during fiscal year.--Above Sacramento:
Government plant and hired labor removed 3,237 snags and other
obstructions from the river channel and banks, at a cost of $13,944.71,
repaired wing dams, at a cost of $957.51, and made general and mis-
cellaneous surveys at a cost of $7,314.70. At and below Sacramento:
Government plant and hired labor removed 39,500 cubic yards from
the river at Sacramento, at a cost of $12,540.43, including preparation
of spoil areas and assembly of boosters; repaired wing dams at a cost
of $16,248.22, and removed miscellaneous obstructions from the river
channel and banks, at a cost of $1,188.58. Clamshell-dredging plant,
working under an hourly basis contract, removed 246,972 cubic yards
from the river and Steamboat Slough channels, at a cost of $40,832.19.
A hydraulic dredge, under contract, removed 468,525, cubic yards
from the river at Sacramento, at a cost of $78,172.11. A contractor
constructed a bituminous highway across a hydraulic fill, at a cost of
$3,202.41, and other spoil-area work in connection with contract
hydraulic dredging cost $8,211.79, by hired labor. General and mis-
cellaneous surveys of the river cost $4,546.55. The total cost was
$187,159.20, for maintenance; total expenditures, $180,240.47.
   Condition at end of fiscal year.-The 10-foot channel below Sacra-
mento was completed in 1931. The work remaining to be done to
complete the project is the provision of a 6-foot depth between Sacra-
mento and Colusa and 5-foot depth thence to Chico Landing, provid-
ing a continuous river flow of 5,000 second-feet is made available upon
completion of the Kennett Reservoir. The controlling low-water
depths in August 1936 were as follows: From the mouth of the river
to the mouth of Cache Slough, 20 feet; thence to Sacramento, 10 feet;
thence to Colusa, 3 feet; and thence to Sidds Landing, 21/2 feet. There
is no regular navigation above Sidds Landing, 179.4 miles above the
mouth. No maintenance work has been done above this point since
1921.
   The total cost was $3,181,183.60, of which $196,616.74 was for new
work and $2,984,566.86 for maintenance. Total expenditures were
$3,185,200.15.
   Proposed operations.-The balance unexpended July 1, 1937,
amounting to $19,319.87, together with an allotment of $120,000,
made during July 1937, will be applied during the fiscal year 1938,
as follows:
Accounts payable-----------------------------------             $12, 458. 45
Maintenance :
   Dredging at Sacramento by Government plant, July to Septem-
      ber 1937-----------------------------------        -----   61, 000.00
   Dredging below Sacramento by contract, August 1937---------    4, 800. 00
    Snagging below Sacramento by Government plant, December
      1937-----------------------------------------------------3,000. 00
   Maintenance of wingdam system at and below Sacramento by
      Government plant, July to November 1937---------------- 24, 000. 00
   Dredging above Sacramento by contract, August 1937-------      2, 400. 00
   Dredging above Sacramento, by Government plant, July and
      August 1937 ------      ----------------------  _           2,800. 00
1462          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Maintenance-Continued.
   Snagging above Sacramento by Government plant, July to
      October 1937--------------------------------------------                $12,000.00
   Maintenance of wingdam system above Sacramento by Gov-
      ernment plant, July to November 1937----------------------               10,000. 00
   General survey of river above Sacramento, by Government
      plant, during fiscal year__________------------------------,-----------   5, 000. 00
   Snagging and dredging in tributary channels (50 percent con-
      tract work) ___--------------------__        _            --------        1, 861.(42

             Total                    _______
                      for maintenance---------------                       ---                                  126,861.42

The additional sum of $150,000 can be profitably expended for
maintenance during the fiscal year 1939, as follows:
Dredging at Sacramento, by Government plant, July to September
1938 and June 1939-------------------------------------------     $75, 000
Dredging below Sacramento, by contract, August 1938_ ___----__       5, 000
Snagging below Sacramento, by Government plant, December 1938_       3, 000
Maintenance of wingdam system at and below Sacramento, by Gov-
  ernment plart, July to November 1938 __--------------------       28,000
Dredging above Sacramento by contract, September 1938__       _      3,000
Dredging above Sacramento by Government plant, July and Aug-
  ust 1938 ----------------------    -----   ------------------ --    3, 000
Snagging above Sacramento by Government plant, July to October
   19381_____ __              ______- _____1__ _-__-                                                                    16,000
Maintenance of wingdam system above Sacramento, by Government
  plant, July to November 1938---------------------                                                                      15, 000
Snagging and dredging in tributary channels (50 percent contract
   work) _                    .                                                                                           2, 000

        Total for maintenance-- --                                                                                  150, 000

                                         Cost and financial summary

Cost of new work to July 30, 1937------------------------                                                   $381, 814. 93
Cost of maintenance to June 30, 1937                                                                      3, 538, 286. 81

     Total cost of permanent work to June 30, 1937                                                         3, 920, 101. 74
Undistributed costs June 30, 1937------------------------_                                                     16, 475. 00

     Net total cost to June 30, 1937----                                                                   3, 936, 576. 74
Minus accounts payable June 30, 1937     -------                                                               12, 458, 45

     Net total expenditures_     -------------------                                                       3, 924, 118. 29
Unexpended balance June 30, 1937                     -                    -                        -           19, 319. 87

        Total amount appropriated to June 30, 1937_                                          -             3, 943, 438. 16

   Fiscal year ending June 30                 1933            1934               1935              1936                  1937


C ost of new work                    ----.
                                        ----.-------    .-. . . . . . .. . . . . .. . . . . .. . . . .. ............
Cost of maintenance   ----.       ----    $164, 749. 51   $140,172.16    $103, 649. 15  $165,130. 01     $187, 159. 20

Total expended-                             138, 889. 82   148, 270. 44          1,088. 37       191, 442. 84           181, 240. 47
Allotted .        .                         141, 252. 33   264, 300. 95     36, 123. 81          190, 000. 00 .     .        .


Balance unexpended July 1, 1936-------------------------------                                                  $200, 560. 34
Gross amount expended-----------------------------                                      $183, 354.74
Less reimbursements collected -----------------------
                                     _                                                     2, 114. 27
                                                                                                                 181, 240. 47

        Balance unexplended June 30, 1937 ___-------------------                                                  19, 319. 87
        RIVER AND HARBORS-SACRAMENTO,                  CALIF., DISTRICT       1463
Outstanding liabilities June 30, 1937-----------------   $11, 262.18
Amount covered by uncompleted contracts                _    , 196. 27
                                                           1____
                                                                         $12, 458. 45

     Balance available June 30, 1937--------------------                   6, 861.42
Amount allotted during July 1937__ _________________111
                                          111__1120,                          000. 00
      Balance available for fiscal year 1938 _____       _____ ___-___   126, 861. 42
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 1-      _-_   ---   _   __150,                   000. 00
  1 Exclusive of available funds.

                         5. FEATHER RIVER,          CALIF.

   Location.-This river rises in the Sierra Nevada, and empties into
the Sacramento River about 20 miles above the city of Sacramento.
 (See U. S. Geological Survey sheet "Topographic Map of the Sacra-
mento Valley, Calif.")
   Previous projects.-Adopted by River and Harbor Act of July 27,
1916, without previously published report. Cost and expenditures
prior to the adoption of the existing project were $6,169.46, of which
$6,159.90 was from contributed funds and $9.56 from United States
funds. (For further details see p. 1985, Annual Report for 1915.)
   Existing project.-This provides for improvement of the river
from its mouth to Marysville by providing for a channel of such
depths as may be practicable at an average annual cost not in excess
of $10,000, and that no local cooperation be required in addition to
the contribution already made by local interests in accordance with
the requirement of River and Harbor Act of July 27, 1916.
   The latest (1931) approved estimate for annual .cost of mainte-
nance is $1,500.
   Ordinary flood fluctuation is 20 feet and extreme flood fluctuation is
about 25 feet.
   The existing project was authorized by the River and Harbor Act.
approved January 21, 1927. (Rivers and Harbors Committee Doc.
No. 1, 69th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are several small landings, all pri-
vately owned. All other traffic is handled on the bank. These facil-
ities are considered adequate.
   Operations and results during fscal year.-None.
   Condition at end of fiscal year.-This project is one of maintenance.
The controlling depth from the mouth at Vernon up to Marysville is
usually 3 feet from about February' 15 to June 15. The channel and
banks have been cleared of the worst obstructions and any possible
navigation thereby facilitated. The work remaining to be done is
the removal of obstructions and construction of wing dams as needed.
The -cost and expenditures for all work under this project were
$7,819.05 for maintenance, of which $3,978.95 were United States
funds and $3,840.10 contributed funds.
   Proposed operations.--The balance unexpended July 1, 1937,
amounting to $1,000 after deducting a revocation of $500 made in
July 1937, will be applied to maintenance, in removing obstructions
from the channel and banks by snagging, wing dams, and dredging
work by Government plant.
1464       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The additional sum of $1,500 can be profitably expended during
the fiscal year 1939 on bank and channel work similar to the above.
                                Cost and financial summary
Cost of new work to June 30, 1937______                 ___---------
Cost of maintenance to June 30, 1937 ___                 -________--------------           $3, 988. 51

       Total cost of permanent work to June 30, 1937--------------                          3, 988. 51

Net total expenditures___ ____________---                                  -         -      3,988. 51
Unexpended balance June 30, 1937_     _______-----------1,                                    500. 00

       Total amount appropriated to June 30, 1937_------__-------                          5, 488. 51

       Fiscal year ending June 30        1933        1934           1935            1936       1937


Cost ofnew work ........ . ... .-
                                . _  .             -..
                                                ....                           . ......    . ,...
                                                                                     . .....
Cost of maintenance............. ...........
                                          . . . . .- . .                       . . . . . .------- -
Total expended...--------------------------------------------------------------------
Allotted-------------------------------.$16. 30...                   $1, 500


Balance unexpended July 1, 1936 ___________________________----
                                           -                          $1, 500. 00
Balance unexpended June 30, 1937_____      _____------------------ __ 1, 500. 00
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for maintenance 2-___
                            -        ____________           __     ____#_            __-    1, 500. 00
  1 In addition, $10,000 was expended from contributed funds.
  2 Exclusive of available funds.

        6. MIDDLE RIVER AND CONNECTING CHANNELS, CALIF.

   Location.--Thiese waterways are part of a complicated network of
tidal channels, some natural and some artificial, in the delta of the
San Joaquin River. Middle River, one of the principal channels, is
a bychannel of the San Joaquin, leaving Old River, another by-
channel above the city of Stockton and rejoining the main river about
15 miles below Stockton. Whiskey Slough enters the San Joaquin
some miles upstream from Middle River and is connected by Empire
Cut, an artificial waterway, with Latham Slough and Middle River.
Turner Cut is an artificial cut-off at the mouth of Whiskey Slough.
(See U. S. Geological Survey, California quadrangles Bouldin, Wood-
ward Island, Holt, Union Island, Stockton, and Lathrop.)
   Previous projects.-Adopted by the River and Harbor Act of July
3, 1930. The total cost and expenditures to the United States were
$2,390.23, of which $1,600 was for new work and $790.23 for mainte-
nance. For further details see page 1290 of Annual Report for 1934.
   Existing project.-This provides for a channel 9 feet deep and 100
feet wide in Middle River below Borden highway bridge; in Latham
Slough between Middle River and Empire Cut; and in Empire Cut,
Whiskey Slough, and Turner Cut between Middle River and San
Joaquin River. The mean range of tide is about 3 feet during stages
of extreme low water.
   The estimate of cost for new work, made in 1935, was $6,500, ex-
clusive of amounts expended on previous projects. The latest (1935)
approved estimate of cost for annual maintenance is $1,500.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 48, 72d
Cong., 1st sess.). The latest published map is in the project docu-
ment.
                  RIVER AND HARBORS-SACRAMENTO,                                                   CALIF., DISTRICT              1465
   Local cooperation.-Localinterests are required to furnish without
cost to the United States all necessary rights-of-way and disposal
areas for the dredged material during initial construction and for
future maintenance as and when needed; also, no expense shall be
incurred by the United States for bank protection or levee mainte-
nance. Conditions have been fully complied with.
   Terminal facilities.-There are no extensive terminal facilities on
these waterways, other than bank landings along the channels, which
are considered adequate. There is one large wharf with warehouse
at Middle River Station, with rail connection.
   Operations and results during fiscal year.-Clamshell dredging
plant, working under contract on an hourly basis, excavated 77,528
cubic yards from shoals, in Middle River, Whiskey Slough, and
Turner Cut, at a cost and expenditure of $6,754.22 for new work, and
also excavated 11,823 cubic yards from a shoal in Empire Cut, at a
cost and expenditure of $891.30 for maintenance. Total costs ant
expenditures were $7,645.52.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937. The controlling depth is the project depth of 9 feet at
mean lower low water in all of the channels. The total costs and
expenditures are $7,645.52, of which $6,754.22 was for new work and
$891.30 for maintenance.
   Proposed operations.-An allotment of $1,500 made during July
1937 will be applied to maintenance in redredging channels 9 feet
deep by 100 feet wide in Middle River below Borden Highway Bridge,
in Empire Cut, Latham Slough, Whiskey Slough, and Turner Cut,
by clamshell dredges under contract, in April 1938.
   The additional sum of $1,500 can be profitably expended during
the fiscal year 1939 for dredging operations similar to the above.
                                                               Cost and financial summary
                                           -
Cost of new work to June 30, 1937_____________-    _ _------  ___ $8, 354.22
Cost of maintenance to June 30, 1937------------------------------1, 681. 53

                                                        -
       Total cost of permanent work to June.30, 1937______                                                          ____ 10, 035. 75
Net total expenditures------          ----------------                                                                  10, 035.75

               Total amount appropriated to June 30, 1937____________..                                                 __ 10,035.75

               Fiscal year ending June 30                                  1933        1934         1935            1936        1937


Cost of new work ..-- -------------
                                 -                                   ------------ ------- ---- -----------------------         $6, 754. 22
Cost of maintenance ------------------
                           __                                        ------------       $790. 23 ...                               891. 30
           Total cost            ----------------------               ------------     790. 23 ------------..-----------        7, 645. 52
Total expended..                       .......-----------------------------------       783. 03       $7. 20   --               7, 645. 52

Allotted---------------------------.............................    ---......   $800    503. 00    -509. 77          $8, 000    -354. 48


Balance unexpended July 1, 1936    __________________-_________ $8, 000.00
Deductions on account of revocation of allotment------------------- 354. 48
      Net amount to be accounted for------------------------------ 7, 645. 52
Gross amount expended              __________-   ---           -      7, 645. 52
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-          -       -        -     -             1. 500. 00
Amount available for fiscal year 1938-              -   ------     __ 1,
                                                                      1,--500. 00
Amount that can be profitably expended in fiscal year ending June 30,
                            1          - -  - -           -
1939, for maintenance ______                                  ___    1, 500. 00
I Exclusive of available funds.
1466    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                  7. SUISUN BAY CHANNEL, CALIF.

   Location.-Suisun Bay is about 30 miles northeast of San Fran-
cisco. (See U. S. Coast and Geodetic Survey Chart No. 5534.)
  Previous projects.-Adopted by the River and Harbor Act of March
2, 1919. The total cost and expenditures to the United States were
$118,718.26, of which $58,901.25 was for new work and $59,817.01 was
for maintenance. In addition, $65,000 was contributed, of which
$59,551.24 was for new work and $5,448.76 for maintenance. For
further details see page 1562 of Annual Report for 1926.
   Existing project.-This provides for a channel 300 feet wide and
30 feet deep through Bulls Head Point, Point Edith, and Middle
Ground Shoals to the mouth of New York Slough, and for a channel
20 feet deep and 250 feet wide south of Seal Islands from the main
channel at Point Edith to the main channel again at Bay Point. All
depths refer to mean lower low water. The tidal range between mean
lower low water and mean higher high water is 6.3 feet. The extreme
range is 9.5 feet.
   The estimate of cost for new work, revised in 1935, was $142,000, ex-
clusive of amounts expended on previous projects. The latest (1930)
approved estimate for annual cost of maintenance is $25,500.
   The existing project was authorized by the following river and
harbor acts: The act of January 21, 1927, provided for a 26-foot
channel through the bay (H. Doc. No. 554, 68th Cong., 2d sess.); act
of July 3, 1930, provided for the 30-foot channel across Bulls Head
Point Shoal, and for the channel south of Seal Islands (Rivers and
Harbors Committee Doc. No. 23, 71st Cong., 2d sess.). The Public
Works Administration, September 6, 1933, and the act of August 30,
1935, provided for a 30-foot channel through Bulls Head Point, Point
Edith, and Middle Ground Shoals to the mouth of New York 'Slough
 (Senate committee print, 73d Cong., 1st sess. (San Joaquin River
and Stockton Channel, Calif.)). The latest published map is in
Rivers and Harbors Committee Document No. 4, Seventieth Congress,
first session.
   Terminal facilities.-Along the channel, between the western end
of the bay and mouth of New York Slough, there are three wharves
and two car-ferry slips. The facilities are considered adequate.
   Operations and results during fiscal year.-Surveys with sound-
ings were made, by hired labor, at a cost of $629.59, for maintenance.
There were no expenditures.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934. The controlling depth in the main channel is 27 feet
and in the channel south of Seal Islands is 181/2 feet. Total cost of
the existing project, except work done under the Public Works pro-
gram as part of the San Joaquin River 30-foot project, was $215,-
139.12, of which $142,026.28 was for new work and $73,112.84 for
maintenance. Total expenditures were $214,509.53.
   Proposed operations.-The balance unexpended on July 1, 1937,
amounting to $1,542.43, together with an allotment of $22,500 made
during July 1937, will be applied to payment of accounts payable,
$585.41, and to maintenance dredging in the 30-foot channel project
near Bulls Head Point, Point Edith, Port Chicago, through Middle
            RIVER AND HARBORS-SACRAMENTO,                                             CALIF., DISTRICT                   1467
Ground Shoal, and near the mouth of San Joaquin River, by Gov-
ernment hopper dredge, in July and August 1937.
  The additional sum of $22,500 can be profitably expended during
the fiscal year 1939 for work similar to the above during October and
November 1938.
                                         Cost and financial summary

Cost of new work to June 30, 1937__                                                                            $200, 927. 53
Cost of maintenance to June 30, 1937__                                                                          132, 929. $5
      Total cost of permanent work to June 30, 1937                                                            -333, 857. 3,
Undistributed costs June 30, 1937_                                                                                     --44. 18
      Net total cost to June 30, 1937_                                                                          333, 813. 20
Minus accounts payable June 30, 1937_                                                                                585. 41

           Net total expenditures_______-_____                                                                 '333, 227. 79
Unexpended balance June 30, 1937_                                                                                  1, 542. 43

           Total amount appropriated to June 30, 1937_                                                    -_    334, 770. 22

           Fiscal year ending June 30                         1933         1934          1935          1936              1937


Cost of new work-----------------------------------------     ------------                             - ---
Cost of maintenance __      --       ---   $6, 691. 62
                                                    62_ -- ----- $22, 499.04                        $22, 458. 53          $629. 59
Total expended __6,                                           693. 04         .--      22, 333.03    22, 624. 54--
Allotted .........                                            5, 770. 22
                          ....----------------------------------           $22, 500    22, 500.00    22, 500. 00      -21, 000. 00


Balance unexpended July 1, 1936-----------------------------                                                    $22, 542. 43
Deductions on account of revocation of allotment             __                   ----------                     21; 000. 00
      Balance unexpended June 30, 1937------------                                                                    1, 542.43
Outstanding liabilities June 30, 1937 _________--_______________                                                         585.41

            Balance available June 30, 1937---------------------------                                                  957. 02
Amount allotted since June 30, 1.937------------------22,                                                                00. 00
                                                                                                                        50

     Balance available for fiscal year 1938------------------                                                        23, 457. 02
Amount that can be profitably expended in fiscal year ending June
30, 1939 for maintenance 2_- _________                                                                            22, 500. 00
    12 In addition, $65,000 was expended
       Exclusive of available funds.
                                                           from contributed funds.


                                     8. SUISUN CHANNEL, CALIF.

   Location.-Suisun Channel is the project channel in Suisun Slough,
a tidal inlet with its mouth on the northwest side of Suisun Bay,
about 7 miles northeast of Benicia and 36 miles northeast of San
Francisco. (See U. S. Coast and Geodetic Survey Chart No. 5534.)
  Existing project.-This provides for dredging a channel 8 feet
deep at mean lower low water from Suisun Bay to and in the basin
at the town of Suisun, straightened by four cut-offs in the upper por-
tion; channel widths to be 200 feet in the bar channel, 100 feet in the
cut-offs, and a minimum of 125 feet in the remaining parts of the
project channel; widening four bends located 5, 51/, 71/2, and 121/
miles below Suisun; the removal of ledge rock from the channel
at a location about 2 miles below Suisun; and a 1,400- by 150-
foot basin at Suisun, with an extension 275 feet wide and 600
1468        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

feet long. The range between mean lower low water and mean higher
high water is 6.4 feet, with an extreme range of 10 feet.
   The estimate of cost for new work, revised in 1937, is $164,500. The
latest (1937) approved estimate for annual cost of maintenance is
$4,000.
   The existing project was authorized by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 1110, 60th Cong., 2d Sess.), as amended
by the River and Harbor Act of March 4, 1913, to provide for the
modification of the project, which was made later by the Secretary
of War; and the River and Harbor Act of August 26, 1937 author-
ized a channel depth of 8 feet with a width of 200 feet in the bar
channel and 100 feet in cut-offs; widening four bends below Suisun;
removal of ledge rock and extension of the basin at Suisun. (Rivers
and Harbors Committee Doc. No. 97, 74th Cong., 2d sess.) This docu-
ment contains the latest published map.
   Local cooperation.-Local interests are required to furnish free
of cost to the United States all necessary rights-of-way and suitable
spoil-disposal areas for new work and subsequent maintenance, under-
take any necessary reconstruction of the power line crossing over the
proposed cut-off near Suisun, and provide at Suisun adequate public
terminal facilities subject to the approval of the Chief of Engineers.
These requirements have not yet been fulfilled. It is anticipated that
the required local cooperation will be met at the time funds become
available to prosecute the work.
   Terminal facilities.-There are three wharves in the city of Suisun,
with a total of 600 feet of berthing space. There is also warehouse
space of 33,500 square feet, and an oil-storage terminal. These facil-
ities should be increased in accordance with the provisions in the
project document last noted above under "Existing project."
   Operations and results dusring fiscal year.-None.
   Condition at end of fiscal year.-The existing project is 14 percent
completed. The work remaining to be done is to provide a channel
with depth of 8 feet at mean lower low water, with the authorized
project widths from Suisun Bay to and in the basin at the city of
Suisun, including straightening by four cut-offs and widening at four
bends; the removal of ledge rock in the channel, 2 miles below
Suisun; and the extension of the existing harbor basin at Suisun
with a width of 275 feet and length of 600 feet, all in accordance
with the River and Harbor Act of August 26, 1937. The controlling
depth is 8 feet in the channel and harbor basin. The cost and ex-
penditures under the existing project were $22,984.77 for new work
and $31,922.64 for maintenance; total, $54,907.41.
   Proposed operations.-No funds available and no operations pro-
posed for the fiscal year 1938.
   The sum of $139,500 can be profitably expended for new work
during the fiscal year 1939, as follows:
Dredging 8-foot channel to project widths, from Suisun Bay to and
  in the harbor basin at Suisun, including four cut-offs, widening of
  four bends, and extension of harbor basin, by pipe-line dredge
  under contract, August to December 1938-___        _________    ___   $138, 000
Removal of ledge rock from channel at a point 2 miles below
  Suisun by contract, August or September 1938__                   -
                                                            __- _ _--      1, 500
       Total ......---   -      -- _______                        __     139, 500
            RIVER AND HARBORS-SACRAMENTO,                                                    CALIF., DISTRICT             1469
                                            Cost and financial summary
Cost of new work to June 30, 1937                                                                                  22, 984. 77
                                                                                                                  $----------------------
Cost of maintenance to June 30, 1937-----                                               --
                                                                                    - ________-_________           31, 922. 64
       Total cost of permanent work to June 30, 1937--------------54, 907. 41
Net total expenditures------------------------------------------- 54, 907. 41
Total amount appropriated to June 30, 1937                             907. 41
                                                                   5-----------------------4,

          Fiscal year ending June 30                             1933               1934       1935        1936           1937

Cost of new work___-------------
Cost of maintenance              .-------------------
                                          $15, 958. 40                                   -
Total expended--.......--   ..................-------------------.. 15, 958. 40 ......                               .........
Allotted------....                                         15, 958. 40
                                         ...---------------------.                             $17, 500   -$7, 500      -$10, 000


Balance unexpended July 1, 1936-------------------------------                                                    $10, 000.00
Deductions on account of revocation of allotment                                                                   10, 000. 00
Amount (estimated) required to be appropriated for completion of
existing project --------------------------------------------        139, 500. 00
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work-----------------------------------------       __ 139, 500.00

                                               9. OLD RIVER, CALIF.

   Location.-Old River is the most westerly branch of the intercon-
necting tidal channels into which the San Joaquin River divides in
crossing its delta. It leaves the main river 21/2 miles downstream
from the Mossdale State Highway Bridge, or 131/2 miles above the
mouth of Stockton Channel, and flows westerly and northerly 32
miles to its lower confluence with the main river, 23 miles above its
mouth in Suisun Bay.
  Existing project.-This provides for the easing of three sharp bends
in Old River between its mouth and Orwood (Santa Fe) Bridge; a
channel 10 feet deep and 80 feet wide to the Santa Fe wharves and
Phillips Cannery at Orwood Station; entrances 8 feet deep and 80
feet wide to the Fabian-Bell Canal at its westerly end and just west
of the Grant Line Highway Bridge; enlargement of Grant Line
Canal west of Doughty Cut to a depth of 10 feet and width of 100
feet; a channel 10 feet deep and 80 feet wide with suitable alinement
from the westerly end of Doughty Cut to the Holly sugar factory; a
channel 8 feet deep and 80 feet wide from the southerly end of Doughty
Cut to the head of Old River; and a channel 6 feet deep and 80 feet
wide in the original channel of Old River from the westerly end of
Grant Line Canal to the Lammers Ferry Road. All depths are re-
ferred to mean lower low water. The tidal range between mean lower
low water and mean higher high water at the head of Old River is
about 2 feet, and at its mouth about 4 feet; ordinary flood fluctuations
are, respectively, 15 feet and 51/2 feet; extreme flood fluctuations are,
respectively, 19 feet and 8 feet.
   The estimate of cost for new work made in 1937 is $72,000. The
latest (1937) approved estimate of cost for annual maintenance is
$15,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 151, 75th Cong., 1st sess.). This docu-
ment contains the latest published map.
1470        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Local cooperation.-Local interests are required to furnish without
cost to the United States all necessary rights-of-way and suitable
spoil-disposal areas for new work and for subsequent maintenance as
necessary, and to agree to provide public landings satisfactory to the
Chief of Engineers on each side of the proposed channel in Old River
near Lammers Ferry Road and on the Fabian-Bell Canal west of
Grant Line Bridge. These requirements have not been fulfilled. It
is anticipated that the required local cooperation will be met at the
time funds become available to prosecute the work.
   Terminal facilities.-The Santa Fe Railroad has a warehouse and
wharf at Orwood for transfer of farm produce from boat to rail.
The Phillips Cannery at Orwood has similar facilities. The Holly
Sugar Co. refinery and terminal near Tracy has a large wharf and an
unloading basin .with three mechanical unloading and conveying units
connecting with a warehouse; there is also a passing basin one-half
mile downstream. There are about 90 private bank landings along the
project channels, some having sheds for storage. Public landings
should be provided as set forth above under "Local cooperation."
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
existing project. The two heads of navigation are at the head of
Old River in San Joaquin River, and at the Holly sugar-factory
wharf, 2 miles north of Tracy. The controlling depths at mean lower
low water at the end of the fiscal year are as follows: Between the
mouth of Old River and Grant Line Canal, 13 feet; in Grant Line
Canal, 8 feet; above Grant Line Canal, from 7 to 20 feet in the sev-
eral channels. Flood stages are of little value to navigation, as the
greater part of the commerce is carried on at low-water stages.
There have been no costs nor expenditures.
   Proposed operations.-No funds are available and no operations are
proposed for the fiscal year 1938.
   The sum of $87,000 can be profitably expended during the fiscal
year 1939, as follows:
New work: Dredging channels at locations and to dimensions specified
under "Existing project" above, in Old River, Fabian-Bell Canal, Grant
  Line Canal, and various cuts and channels in or connecting with Old
  River, by clamshell dredging plant under contract, August to Decem-
  ber 1938 (including removal of obstructions) ---------------------- $72, 000
Maintenance: Dredging channels to restore project dimensions in Old
  River between its mouth and head (in San Joaquin River), and also
  in the various project channels in connecting waterways, by clamshell
  dredging plant, under contract, in May or June 1939-------------- 15, 000

       Total-------------------------------------------                      87, 000

                                   Cost and financial summary
Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion of
existing project------------------------------------------------ $72, 000
Amount that can be profitably expended in fiscal year ending June 30,
1939:
   For new work .    ...                                        __           72, 000
   For maintenance--       ----------------------------------------          15, 000

       Total                                      -       -   --   _------   87, 000
         RIIVER       AND HARBORS-SACRAMENTO,                                      CALIF., DISTRICT                    1471
    10. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year was $46,840.10, and the expendi-
tures were $46,997.21. The balance unexpended and accounts receiv-
able July 1, 1937, amounting to $1,964.78, together with an allotment
of $30,000 made during July 1937, will be applied during the fiscal
year 1938 to payment of expenses incurred under this heading.
   The additional sum of $40,000 can be profitably expended during
the fiscal year 1939, for similar purposes.
                                        Cost and financial summary

Cost of new work to June 30, 1937__________        __
Cost of maintenance to June 30, 1937-_ .___. _______-__---                                           -_      $256, 022.06
      Total cost of permanent work to June 30, 1937------------256, 022.06
Undistributed costs June 30, 1937____________________________      -- 884. 77

      Net total cost to June 30, 1937----------------------------                                             255, 137.29
Minus accounts payable June 30, 1937-__-_-_________________                                                        475. 27

                                     --
     Net total expenditures_____________________--                                            _               254, 662. 02
Unexpended balance June "30, 1937_-- -__________-                                                               1, 964.78
         Total amount appropriated to June 30, 1937______________                                             256, 626. 80

         Fiscal year ending June 30                        1933        1934            1935           1936             1937

Cost of new work----------------------------------------
Cost of maintenance____..     __   __________    _   $13, 360. 22   $17, 779. 32    $90, 861. 35   $38, 601. 70      $46, 840. 10
Total expended           -_____ -______ ______        13, 526. 94    16, 445. 68     90, 859. 47   38, 491. 38       46, 997. 21
Allotted__...__________--______          ___          14, 321. 49   121, 201. 88     14, 103. 43    38, 000. 00       20, 000. 00


Balance unexpended July 1, 1936 ________________________________                                                  $28, 961.99
Amount allotted from War Department Appropriation Act approved
May 15, 1936---------     ----------------------------------                                                     20, 000. 00
      Amount to be accounted for_____________________________                                                     48, 961. 99
Gross amount expended-------------__                 $51, 714. 26
Less reimbursements collected____________________      4, 717. 05
                                                                                                                  46. 997 21

      Balance unexpended June 30, 1937    ___                                                                       1, 964. 78
Outstanding liabilities June 30, 1937__ _______                                                                       475.27


     Balance available June 30, 1937___ _____                                                                       1, 489. 51
Amount allotted during July, 1937___________                                                                      30, 000. 00

      Balance available for fiscal year 1938 -___-   ------                                                       31, 489. 51
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1                   -___-_-      --  _                                                 40, 000.00
   1Exclusive of available funds.

        11. PLANT ALLOTMENT FOR SACRAMENTO, CALIF., DISTRICT
                                        Cost and financial summary

Undistributed costs June 30, 1937---______________                 $121, 073.08
Plus or minus balance "Plant rental", "Insurance and adjustment",
  etc., accounts, June 30, 1937__-- ___  _________________________ -15, 336.74

         Net total cost to June 30, 1937__________ ______                                  ______             105, 736. 34

         20196-37-pt. 1-93
1472             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Plus accounts receivable June 30, 1937--------------------------                                                                        $6, 086. 06

      Gross total costs to June 30, 1937_______-----__---------                                                                        111, 822. 40
                                       --------
Minus accounts payable June 30, 1937_______________                                                                                      3, 868. 66

     Net total expenditures__-_ ___ -------------------                                                                                107, 953.74
Unexpended balance June 30, 1937 __________      ____                                                                                   18, 019.51

           Total amount appropriated to June 30, 1937________________                                                                  125, 973.25

     Fiscal year ending June 30                           1933                   1934               1935                      1936         1937


Total expended----------..................-------------------------                            $74, 229. 53              -$15,132.12      $48,856. 33

Allotted................---------------- ----------------------------                              84, 475. 08           -------------     41, 498. 17


Balance unexpended July 1, 1936-------------------------------                                                                         $25,377. 67
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------------_                                                                                57, 498. 17

           Amount to be accounted for ________________--------------82, 875.84
Deductions on account of revocation of allotment                                                        --                ______        16, 000.00

      Net amount to be accounted for-                        --   66, 875. 84             ---
Gross amount expended                                 132,448.55
                                                     $______________---------__
Less:
    Reimbursements collected------------$83, 587.42
    Receipts from sales_----___-____           4. 80
                                                       83, 592.22
                                                                  48, 856. 33

      Balance unexpended June 30, 1937                                                                                                  18, 019.51
Outstanding liabilities June 30, 1937--_                                                                                                 3, 884. 86
      Balance available June 30, 1937 --------------------------                                                                        14, 134.65
Accounts receivable June 30, 1937__                                                                                                      6, 086.06
           Unobligated balance available June 30, 1937 __-- _______                                                                     20, 220. 71
     Status of reports called for by river and harbor acts and committee resolutions

                                                                                Date trans-
          Locality                     Authorization act                         mitted to               Document no.                  Recomn
                                                                                 Congress

Bear Creek, Calif. (pre-            Flood Control Act, ..
  liminary examination                May 6, 1936.
  for flood control).
Big Deadmans Creek, ..... do .. __ ..........................
  Calif. (preliminary ex-
  amination for flood
  control).
Black      Rascal      Creek,        -.....do ...............................
  Calif. (preliminary ex-
  amination for flood
  control).
Burns Creek, Calif. (pre- .... do .......................................
 'liminary examination
  for flood control).
Canal Creek, Calif. (pre- ..... do-....---------------           - - --                   -.   .    .        .   .   .    .
  liminary examination
  for flood control).
Duck Creek, Calif. (pre- -.... do..-----------------
  liminary examination
  for flood control).
Fahrens Creek, Calif. ..... do....-------------------
  (preliminary examina-
  tion for flood control).
     RIVERS AND HARBORS-FIRST                              PORTLAND,           OREG., DISTRICT1473


      Status of reports called for by river and harbor acts and committee
                              resolutions--Continued


                                                          Date trans-                               Recommenda-
        Locality               Authorization act           mitted to          Document no.              tion
                                                           Congress

Little Deadmans Creek, Flood Control Act,
  Calif. (preliminary ex-   May 6, 1936.
  amination for flood
  control).
Mariposa Creek, Calif.     .---do....----
  (preliminary examina-
  tion for flood control).
Miles Creek, Calif. (pre- ....do ................
  liminary examination
  for flood control).
Old River, Calif_ _....    River and Harbor Act, Feb. 16,1937             House, 151, 75th Cong., Favorable.
                            Aug. 30, 1935.                                 1st sess.
Owens Creek, Calif .--- Flood Control Act,
                             May 6, 1936.
Sacramento and San Flood Control Com- Apr. 8,1937                                          .___________.
                                                                                                   Unfavorable.
  Joaquin River system      mittee resolution,
  (fresh-water canal).      Apr. 24, 1935.
Sacramento and San Senate committee res-
Joa quinValleys, Calif.,   olution, May 19,
  improvement Yol o         1936.
  bypass to reduce
  flood damage.
Sacramento and San Senate committee res- June 24,1937                     Senate committee          Favorable.
  Joaquin      Va lley s,   olution, Dec. 13,                              print, 75th Cong.,
  Calif., river system of   1935.                                          1st sess.
  (flood control).
Sacramento River,
  Calif.:
     Chicao Landing to       Senate committee res-
        Red Bluff.             olution, Apr. 27, 1936.
     Modification exist-     Senate committee res-
       ing project.            olution, Oct. 26, 1933.
Sacramento River, im-        River and Harbor Act,
  provement at Collins-        Aug. 26, 1937.
  ville    cut,     Solano
  County, Calif.
    Do.... ...   .. . .. .   Rivers and Harbors
                              Committee resolu-
                              tion, May 21, 1937.
San Joaquin River and        Rivers and Harbors          Jan. 23, 1937    Rivers and Harbors           Do.
  Stockton    Channel,        Committee resolu-                             Committee, 15, 75th
  Calif.                      tion, June 20, 1935.                          Cong., lst sess.
San Joaquin      River,      River and Harbor Act,                       -----------------------.
  Calif., improvement         Aug. 26,1937.
  at Werner cut, Contra
  Costa County, Calif.
    D o_---- -- --    ...    Rivers and Harbors
                               Committee resolu-
                              tion, May 21, 1937.


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
         FIRST PORTLAND, OREG., DISTRICT
   This district comprises the Pacific drainage area of those streams
flowing into the Pacific Ocean in Oregon and the Columbia River
Basin from the mouth to Vancouver, Wash., inclusive.
   District engineer: Lt. Col. Milo P. Fox, Corps of Engineers, to
June 3, 1937, and Capt. S. L. Damon, Corps of Engineers, since that
date. Division engineer: Lt. Col. Thomas M. Robins, Corps of
Engineers.
1474        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                   IMPROVEMENTS

                                      Page                                         Page
1.    Coquille River, Oreg .---   _ 1474    17. Lake River, Wash --------         1508
2.    Coos Bay, Oreg----------- 1476        18. Lewis River, Wash-------          1509
3.    Coos River, Oreg_ _ _         1478    19. Cowlitz River, Wash ......        1510
4.    Umpqua River, Oreg------- 1479        20. Elokomin Slough, Wash      --     1512
5.    Yaquina River, Oreg------- 1482       21. Skamokawa Creek, Wash __          1513
6.    Yaquina Bay and Harbor,               22. Grays River, Wash __              1514
         Oreg------------------1483          23. Deep River, Wash_                 1515
7.    DePoe Bay, Oreg----------1486         24. Columbia River at Bakers
8.    Columbia River at the mouth,                Bay, W ash _..._     _.. ...    1516
         Oregon and Washington__     1487    25. Examinations, surveys and
9.    Skipanon Channel, Oreg ....   1489          contingencies (general)  ---    1517
10.    Youngs Bay and Youngs                 26. Other projects for which nc
         River, Oreg ___________ 1491              estimates are submitted _       1518
11.    Columbia and Lower Willa-             27. Plant allotment--.-.              1518
         mette Rivers below Van-
         couver, Wash., and Port-                   FLOOD-CONTROL PROJECTS
         land, Oreg_____________     1492
12.    Westport Slough, Oreg_....    1498    28.   Columbia River Basin .....      1519
13.    Clatskanie River, Oreg- -- _ 1499     29.   Willamette River Basin ....     1522
14.    Multnomah Channel, Oreg__ 1500        30.   Lewis River Basin_--            1523
15.    Willamette River above Port-          31.   Cowlitz River Basin .......     1524
         land and Yamhill River,             32.   Willamette   River,    Oreg.,
                         _
         Oreg______________          1501            emergency relief flood con-
16.    Willamette River at Willam-                   trol--_------------------     1525
         ette Falls, Oreg --------   1505

                           1. COQUILLE RIVER, OREG.

      Location.-This river rises in the Coast Range, flows in a general
westerly direction for about 100 miles, and empties into the Pacific
Ocean at Bandon, Oreg., about 225 miles south of the mouth of the
Columbia River and 420 miles north of San Francisco Bay. (See
U. S. Coast and Geodetic Survey Charts Nos. 5802 and 5971.)
   Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, and July 13, 1892. The cost and expenditures were, for
new work, $340,725.58, and for maintenance, $41,467.17, a total of
$382,192.75. For further details see page 1986 of the Annual Report
for 1915.
   Existing project.-This provides for two rubble-mound high-tide
jetties at the river mouth, the south jetty 2,700 feet long and the
north 3,450 feet; and for a channel, 13 feet deep at mean lower low
water, between the sea and the eastern end of the north jetty. Mean
lower low water is the plane of reference. The tidal range between
mean lower low water and mean higher high water at the river
mouth is 6.8 feet and the extreme range about 10 feet.
   The estimate of cost for new work, revised in 1930, was $275,600,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $20,000
for dredging. There is no approved estimate for maintenance of
jetties.
   The existing project was adopted by the following river and harbor
acts: The act of June 14, 1880, provided for the jetties (S. Ex. Doc.
No. 14, 45th Cong., 3d sess., and Annual Report for 1879, p. 1806) ;
act of June 25, 1910, provided for dredging shoals between the mouth
and Riverton and removing obstructions between mouth of the North
Fork and Bandon (H. Doc. No. 673, 61st Cong., 2d sess.); act of
March 2, 1919, provided for a 13-foot channel from the ocean to
 RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                     1475
Bandon (H. Doc. No. 207, 65th Cong., 1st sess.); act of July 3, 1930,
provided for deepening the channel to 16 feet between the sea and
the eastern end of the north jetty (H. Doc. No. 186, 70th Cong.,
1st sess.); and the act of August 30, 1935, modified the project to
provide for a channel 13 feet deep between the sea and the eastern end
of the north jetty (Senate committee print, 74th Cong., 1st sess.).
The latest published map of the entrance is found in House Document
No. 186, Seventieth Congress, first session.
  Local cooperation.-The River and Harbor Act of August 30, 1935,
requires that local interests assume the entire expense of providing
and maintaining an adequate channel in the river above the eastern
end of the north jetty.
   Terminal facilities.-At Bandon there are two privately owned
wharves. The existing terminals are considered adequate for the
present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is completed.
  The jetties were completed in 1907, and the entrance channel was
dredged to 12 and 13 feet in November 1925. The outer 300 feet
of the north jetty and the outer 200 feet of the south jetty enrock-
ments have subsided below the ordinary low-water level. The crest
of the remaining portions of the enrockments is above low water. A
survey of the entrance in June 1937 shows a controlling depth of 10
feet across the ocean bar and 11 feet between the bar and Bandon,
in a channel about 200 feet wide.
  The total cost of the work under the existing project was $437,-
011.09, of which $316,640.21 was for new work and $120,370.88 for
maintenance. The total expenditures have been $437,011.09.
  In addition, $72,891.20 was expended from contributed funds for
new work.
  Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
  The sum of $30,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging at mouth of the river, with
Government plant and hired labor.
                                                  Cost and financial summary
Cost of new work to June 30, 1937    ______________________ _   '$657, 365. 79
Cost of maintenance to June 30, 1937___________________________    161, 838.05
      Total cost of permanent work to June 30, 1937____________                                                  819, 203. 84
Net total expenditures_________----------- __                                                                    1____
                                                                                                                  819, 203. 84
Total amount appropriated to June 30, 1937_____________________                                                  819, 203. 84

        Fiscal year ending June 30                             1933           1934         1935           1936         1937


Cost of new work ..---------------------                   $19, 513. 02   .
Cost of maintenance .                        ..        .      -
                                                             ......-. _-_ $7, 253.94       $424. 04       $385. 68
                .______
Total expended___________                                   22, 924. 10         52. 61     -824. 55        521. 77
Allotted_----   --____-----------------18,                     861.80     -18,919.26     -1, 431.40   .


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance---   _____     ________          -_____---$30, 000. 00
  1In   addition, $72,891.20 was expended from contributed funds.
1476     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                          2. COOS BAY, OREG.

   Location.-This bay is located on the Oregon coast about 200 miles
south of the mouth of Columbia River and 445 miles north of San
Francisco Bay. It is,about 13 miles long and 1 mile wide, with an
area at high tide of about 15 square miles. (See U. S. Coast and
Geodetic Survey Charts, Nos. 5802 and 5984.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1879, September 19, 1890, and August 18, 1894. The costs and
expenditures were $980,897.27, of which $802,096.44 was for new work
and $178,800.83 for maintenance. For further details see page 1987
of Annual Report for 1915.
   Existing project.-This provides for two rubble-mound high-tide
jetties at the entrance; for dredging on the bar; for a channel 24
feet deep and 300 feet wide through Pigeon Point reef; for an inner
harbor channel from Pigeon Point Reef to Smith's mill 24 feet deep
and generally 250 feet wide, increased to 450 feet at the railroad
bridge and 300 feet in front of North Bend and Marshfield, and for
a turning basin 1,000 feet long and 600 feet wide opposite Coal Bank
Slough just above Marshfield; for a channel 22 feet deep and 150
feet wide above Smith's mill to Millington. The plane of reference
is mean lower low water.
   The mean of the higher high waters above the plane of reference
and the extreme tidal ranges at the entrance are 7 and about 11
feet, respectively, and at Marshfield 7.3 and 11 feet, respectively.
   The estimate of cost for new work, revised in 1935, is $4,165,600,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $165,000,
not including repairs to the jetties.
   The existing project was adopted by the following river and har-
bor acts: The act of September 19, 1890, provided for two jetties
 (Annual Report for 1890, p. 2936) ; act of June 25, 1910, provided
for dredging the ocean bar channel (H. Doc. No. 958, 60th Cong.,
1st sess.) ; act of March 2, 1919, provided for a 22-foot channel to
Smith's mill (H. Doc. No. 325, 65th Cong., 1st sess.); act of Sep-
tember 22, 1922 (H. Doc. No. 150, 67th Cong., 2d sess.) provided for
the restoration of the north jetty, 9,600 feet long, construction of a
south jetty about 3,900 feet long, and the extension of the 22-foot
bay channel from Smith's mill to Millington; act of January 21,
1927, authorized the extension of the jetties to such lengths as may
be practicable within the estimate of total cost of the jetties, $3,250,-
000, as given in the former document; act of July 3, 1930, provided
for a channel 24 feet deep and 300 feet wide through Pigeon Point
Reef, following a location along the westerly side of the bay (H. Doc.
No. 110, 70th Cong., 1st sess.); act of August 30, 1935, provided for
the 24-foot channel from Pigeon Point Reef to Smith's mill and
turning basin above Marshfield (Senate Committee print, 73d Cong.,
2d sess.). The latest published maps are in the last two documents
mentioned.
   Local cooperation.--Under the provisions of the River and Har-
bor Act of August 30, 1935, local interests are required to furnish,
free of cost to the United States, suitable areas for the disposal of
dredged material during initial construction, and future maintenance
as and when needed, and save the United States free of any claims
for damages on account of dredging operations.
   RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT1477

   Terminal facilities.--At North Bend there is a municipal wharf
384 feet long fronting on the channel and about 1,400 feet of pri-
vately owned mill wharves. At Marshfield there is a broken line
of privately owned wharves about 4,500 feet in length, and one
public wharf with a frontage of about 1,006 feet. About 1 mile
above Marshfield there is a sawmill wharf about 1,000 feet in length.
The existing terminals are considered adequate for the needs of the
present commerce.
   Operations and results during fiscal year.-Maintenance dredging
of the bar and bay channel, by the U. S. dredge Col. P. S. Michie,
was done during March, May, and June, 1937. The dredge removed
5,052 cubic yards from the bar and 969,119 cubic yards from the bay
channels. In addition, under contract for new work dredging, com-
pleted in April 1937, 1,455,235 cubic yards of dredged material and
4,314 cubic yards of rock were removed from the bay channel at a
total cost of $199,744.09. Hydrographic surveys of the bar and bay
were made at a cost of $8,810.48.
   The cost during the year under the existing project was $274,496.14,
,of which $199,744.09 was for new work and $74,752.05 for mainte-
nance. Expenditures were $269,054.05.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937. The south jetty was completed in 1928, its length
being 4,576 feet, and the north jetty in 1929, its length being 7,616
feet. The other features of the existing project prior to the work
authorized by the River and Harbor Act of August 30, 1935, were
completed in 1932. At the close of the fiscal year the controlling
depth in an entrance bar channel 300 feet wide was 26 feet, and 26
feet between the jetties to Guano Rock. The controlling depth be-
tween the entrance and the head of the bay at Marshfield was 22
feet in a channel 250 feet wide.
   The total cost of the work under the existing project was $6,909,-
993.60, of which $4,120,763.51 was for new work and $2,789,230.09
for maintenance, not including $2,713.14 for new work and $8.386.86
for maintenance from contributed funds. The total expenditures
have been $6,895,710.69, of which $6,884,610.69 were United States
funds and $11,100 contributed funds.
   Proposed operations.-The balance unexpended, including ac-
counts receivable at the end of the year, together with allotment of
$160,000 made during July 1937, will be applied as follows:
Accounts payable---------------------------------------------        $25, 445.52
Maintenance dredging of bar and bay channels, with Government
  plant and hired labor, July 1937 to June 1938--___---------------- 170, 688.90
      Total--------------------------------------------------196,           134. 42
  The additional sum of $815,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance :
    Dredging of bar and bay       channels with Government plant and
      hired labor, July 1938 to    June 1939-------------------------     $165, 000
   Restoration of north jetty,    250,000 tons of stone, and construction
      of concrete terminal, by    contract, fiscal year 1939------------- 650, 000
        Total----_--_----                              _----__-__          815, 000
1478          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                               Cost and financial summary
Cost of new work to June 30, 1937__                                922, 859. 95
                                                               $---------------------------4,
Cost of maintenance to June 30, 1937-------------------------- 2, 968,030.92

     Total cost of permanent work to June 30, 1937----------- 17, 890, 890. 87
Minus accounts payable June 30, 1937-------------------------      25, 382. 91

      Net total expenditures---------------------------------                                                    17, 865, 507. 96
Unexpended balance June 30, 1937--------------         -------                                                        36, 134. 42
         Total amount appropriated to June 30, 1937-------------- 17,901,642. 38

         Fiscal year ending June 30                             1933            1934            1935          1936            1937


Cost of new work              .........-                 _             _$199,                                                   744. 09
                    ----------------- $180, 347.43
Cost of maintenance.........                                                 $72, 495. 87   $92, 584. 70 $107, 900..65       74, 752. 05
      Total cost_ _ .        __..          .    .__...       180, 347. 43     72, 495. 87    92, 584. 70   107, 900. 65     274, 496. 14
Total expended_......_________ ___ ______                    161, 162. 41     49, 939. 48   -217,566.79    90, 157. 69      269, 054. 05
Allotted....-...                         .___
                                           .
                        -.-.................             _   223, 635. 13     25, 797. 27   -201,989.76    238, 400. 00      60, 000. 00


Balance unexpended July 1, 1936-------------------------------- $245, 188. 47
Amount allotted from War Department Appropriation
Act, approved May 15, 1936__--_________________      $10, 000. 00
Amount allotted from War Department Appropriation
  Act, approved July 14, 1932---___-_--
                                     --------__        50,000. 00
                                                                   60, 000.00
      Amount to be accounted for ____-----___-----                                                                    305, 188. 47
Gross amount expended__ _____-___-_______-------$270, 298. 75
Less reimbursements collected_-- -----------        1, 244. 70
                                                                                                                      269, 054. 05

      Balance unexpended June 30, 1937---                -----------------                                                36, 134. 42
Outstanding liabilities June 30, 1937__-- _-______------------                                                            25, 445. 52

    Balance available June 30, 1937----------------------------       10, 688. 90
Amount allotted during July 1937_______________--                   160, 000. 00
                                                            _------------

       Balance available for fiscal year 1938________ _________---170, 688. 90
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance 2 - _- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 815, 000. 00
  1In addition $11,100 was expended from contributed funds, $2,713.14 for new work, and
$8,386.86 for maintenance.
  2 Exclusive of available funds.


                                                 3. COOS RIVER, OREG.

   Location.-This river rises in the Coast Range in southern Oregon,
flows about 60 miles in a westerly direction, and empties into Coos
Bay near Marshfield, Oreg. (See U. S. Geological Survey, Coos Bay
quadrangle.)
   Existing project.-This provides for snagging and boulder removal
in a channel ividth of 50 feet from the mouth of the river to the head
of navigation in both forks, to provide a depth of 3 feet generally
and 1 foot near the heads of navigation. The section under improve-
ment includes the mouth and 51/2 miles of the main river and about
81/2 miles of each fork. The plane of reference is mean lower low
water.
    The mean of the higher high waters above the plane of reference
and the extreme tidal ranges under ordinary conditions at the mouth
 RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                       1479
of the river are 7.3 and 11 feet, respectively, and there is a tidal range
of about 1 foot at the head of navigation in the forks. Freshet stages
usually reach a height of from 10 to 15 feet at Allegany.
   The estimate of cost for new work, revised in 1898, was $8,000.
The latest (1923) approved estimate for annual cost of maintenance
is $3,000.
   The existing project was adopted by the River and Harbor Act of
June 3, 1896 (H. Doc. No. 237, 53d Cong., 3d sess.). The latest pub-
lished map is in this document.
   Terminal facilities.-There are several small privately owned
wharves and landing places on the river that are used by small steam-
ers and launches. There are no publicly owned wharves. The exist-
ing terminal facilities are considered adequate for present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1899. The controlling depth is about 4 feet, with a zero gage read-
ing, in a channel about 50 feet wide from the mouth to the head of
navigation on both forks, a distance of about 23 miles.
   The costs have been $66,921.17, of which $8,000 was for new work
and $58,921.17 for maintenance. The expenditures were $66,921.17.
   Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
   The sum of $3,000 can be profitably expended during the fiscal year
1939 for maintenance dredging and snagging on North and South
Forks, by hired plant, May and June 1939.
                                       Cost and financial summary

Cost of new work to June 30, 1937________                                                             $8, 000. 00
Cost of maintenance to June 30, 1937_ ___--                              -_                           58,921. 17

      Total cost of permanent work to June 30, 1937---------------66, 921. 17
Net total expenditures------------------------  -----               66, 921. 17
        Total amount appropriated to June 30, 1937----------------- 66,921. 17

        Fiscal year ending June 30                 1933           1934         1935        1936           1937


cost ofnew work...
                 --------------------
Cost of maintenance____________________
                                                     -.
                                                  $83787
                                                               ----         -
                                                                          -----
                                                                $2, 029. 16
                                                                                     - - ..
                                                                              $2, 177. 43   $43.04
                                                                                                  -------------
                                                                                                        ..
Total expended                - ____-. ___
                           -___________-      _   1, 123. 27     1, 713. 85   2, 380. 24    155. 54
Allotted..-....        .     .------                937. 31        -6. 33     1,900. 00-    -                o,
                                                                                                         -$309.81

Balance unexpended July 1, 1936______________________________                                           $309. 81
Deductions on account of revocation of allotment_----                                                    309. 81
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance-----------------------------__                                            3,000.00
   1 Exclusive of available funds.

                                   4. UMPQUA RIVER, OREG.

  Location.-This river rises in the Cascade Range, flows westerly
about 120 miles, and empties into the Pacific Ocean about 180 miles
south of the mouth of the Columbia River and about 465 miles north
of San Francisco Bay. (See U. S. Coast and Geodetic Survey Charts
Nos. 5802 and 6004.)
1480    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Previous projects.-Adopted by River and Harbor Act of March
3, 1871, and modified in 1886. The total cost and expenditures were
 $39,242.29 for new work. (For further details, see p. 2967 of Annual
Report for 1898.)
   Existing project.-This provides for a jetty on the north side of
the entrance approximately 8,000 feet.in length westerly from the
high-water line to the sea, for a south jetty extending to a point
1,800 feet south of the outer end of the present north jetty, and for
dredging to provide a usable entrance channel 26 feet deep.
   Mean lower low water is the plane of reference. The tidal range
between mean lower low water and higher high water at the river
mouth is 6.9 feet, and the extreme range is about 11 feet.
    The estimate of cost for new work, revised in 1935, is $2,176,500,
exclusive of $276,500 contributed by local interests. The latest (1935)
approved estimate for annual cost of maintenance is $150,000, includ-
ing jetty maintenance.
    The existing project was adopted by the following river and harbor
acts: The act of September 22, 1922, provided for a north jetty 7,500
feet in length (H. Doc. No. 913, 65th Cong., 2d sess.); act of January
21, 1927, provided for the present dimensions of north jetty and
dredging the ocean bar (H. Doc. No. 320, 69th Cong., 1st sess.);
act of July 3, 1930, provided for a short south jetty (H. Doc. No.
317, 70th Cong., 1st sess.) ; act of August 30, 1935, provided for a
full-length south jetty and for maintenance dredging to 26-foot depth
 (Rivers and Harbors Committee Doc. No. 9, 72d Cong., 1st sess.).
The latest published maps are in the last two documents mentioned.
   Local cooperation.-Under the provisions of the River and Harbor
Act of August 30, 1935, local interests are required to give assurances
to the Secretary of War that they will undertake the improvement
and maintenance of the river channel to afford the increased depth
provided in the channel over the bar. Prior requirements fully
complied with.
    Terminal facilities.-At Gardiner there is approximately 250 feet
of wharf frontage, of which 60 feet is publicly owned. At Reedsport
there is about 750 feet of usable wharf frontage, all privately owned.
The port of Umpqua owns one wharf with 456 feet of water front-
age and another with about 75 feet of water frontage which has not
been used generally for commercial shipping. The existing terminals
are considered adequate for present commerce.
   Operations and results during fiscal year.-Work under continuing
contract for repair and extension of the south jetty was started in
January 1937. On June 30, 1937, 70,062 tons of stone had been de-
livered and placed at a cost of $160,142.04, of which 47,440 tons,
costing $116,628.06, was for new work, and 22,622 tons, costing
$43,513.98, was for maintenance. Hydrographic surveys were made
at a cost of $3,056.24. The total cost for the fiscal year was $163,-
198.28. Expenditures were $100,783.30.
   Condition at end of fiscal year.-The existing project is about 65
percent completed. The north jetty was completed in 1930. Ex-
perimental dredging only has been done on the bar. The short south
jetty was completed in November 1933. There remains to complete
the project extension of the south jetty to a point about 1,800 feet
south of the outer end of the present north jetty and maintenance
      RIVERS AND HARBORS---FIRST PORTLAND, OREG., DISTRICT1481

dredging to 26-foot depth, authorized by the 1935 River and Harbor
Act.
   The sea end of the north jetty for about 500 feet has been beaten
down by the seas to such extent that it is submerged at high tide.
   Soundings taken on the bar in June 1936 show a controlling depth
of 11 feet over a width of about 300 feet, following the channel
range. A depth of 15 feet is available on a line leading south of the
range.
   The channel from the entrance to Reedsport was dredged to a
depth of 16 feet in 1924 by the port of Umpqua but has shoaled to
about 11 feet. No maintenance work has been done in the river
channel, which is to be maintained by the port of Umpqua.
   The total cost of work under the existing project was $1,768,054.46,
of which $1,382,294.44 was for new work and $385,760.02 for mainte-
nance, not including $276,500 for new work from contributed funds.
The expenditures have been $1,981,663.79, of which $1,705,163.79 were
United States funds and $276,500 contributed funds.
  Proposed operations.-,-The balance unexpended, including accounts
receivable at the end of the year, together with an allotment of
$475,000 made on July 21, 1937, will be applied as follows:
Accounts payable-----------------------        ------------------- $62, 890. 67
New work: South jetty extension by continuing contract, placing
285,000 tons of stone, July 1937 to June 30, 1938        ___      586, 801. 72
Maintenance: Dredging bar channel, with Government plant and
hired labor, August and September 1937_--__---- ----  ---------    25, 000. 00

           Total-----------------------------------                                                      -       674, 692. 39
    The additional sum of $280,000 can be profitably expended during
the fiscal year 1939 for completion of south jetty enrockment and
terminal structure, by contract, July to October 1938.
                                         Cost and financial summary

Cost of new work to June 30, 193.7------------------------                                               $1, 421, 536. 73
Cost of maintenance to June 30, 1937------______-----------                                                  385, 760. 02

      Total cost of permanent work to June 30, 1937                               ----------                 1, 807, 296. 75
Minus accounts payable June 30, 1937                                                                                 890. 67
                                                                                                                 6-------------------------
                                                                                                                 62,

     Net total expenditures________________________                                                          1, 744, 406. 08
Unexpended balance June 30, 1937 ---------------------------                                                    199, 692. 39

         Total amount appropriated to June 30, 1937--                                                        1, 944, 098.47

         Fiscal year ending June 30                   1933          1934               1935          1936             1937


Cost of new work _______
                   .     __-          ___ __-_   $130, 802. 49 $162, 693. 47    -..     _____            ._________.
                                                                                                                 $116, 628. 06
Cost of maintenance      _-------------------      32, 222. 21    1, 171. 23      $1, 136. 83      $1, 350. 01     46, 570. 22
      Total cost-___-___-      __________    __ 163, 024. 70     163, 864. 70         1, 136. 83    1,350. 01       163, 198. 28
Total expended___________________.____            102, 180. 86   190, 316. 07         1,129. 57    1,178.45         100, 783. 30
Allotted-___    ------      -_--------           299, 206. 04    -5, 320. 70     -1, 529. 16         ----.....      300, 000. 00

   xIn   addition $276,500 was expended from contributed funds.
1482         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936       _                                     $475.69
                                                     __-----------------------------
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-----------------------------------              300, 000. 00

      Amount to be accounted for -------------------------               300, 475.69
                           -----
Gross amount expended--_______                    $100, 786. 95
Less reimbursements collected- __-._______---- --      - 3. 65
                                                                         100, 783. 30

      Balance unexpended June 30, 1937______________________            199, 692. 39
Outstanding liabilities June 30, 1937----------------$1, 290. 69
Amount covered by uncompleted contracts _________ 198, 399. 30
                                                                        199, 689. 99
     Balance available June 30, 1937 ________________________                   2. 40
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937________            __        ____ ___           475, 000. 00
     Balance available for fiscal year 1938 _____________               475, 002. 40
Amount (estimated) required to be appropriated for completion
of existing project 2                                                  280, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work 2                                          280, 000. 00
  2   Exclusive of available funds.

                               5. YAQUINA RIVER, OREG.

   Location.-This river rises on the Coast Range, flows about 50
miles in a westerly direction, and empties into Yaquina Bay, on the
Oregon coast. (See U. S. Coast and Geodetic Survey Charts Nos.
6058 and 5802.)
   Existing project.-This provides for two controlling half-tide dikes
of piling, brush, and stone, each about 1,100 feet long (constructed
by local interests) and for a channel 10 feet deep and generally 150
feet wide, in Yaquina River and in Depot Slough, extending from
the town of Yaquina to Toledo, about 9 miles. Mean lower low water
is the plane of reference.
   The mean of the higher high waters above the plane of reference
and the extreme tidal ranges under ordinary conditions at the mouth
of the river are 8.1 feet and about 12 feet, and the same at Toledo.
Freshet heights are about 12 feet at the mouth of Depot Slough.
   The estimate of cost for new work, made in 1911, was $72.000, of
which amount 60 percent was contributed by local interests. The
latest (1911) approved estimate for annual cost of maintenance is
$1,500.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913 (H. Doc. No. 519, 62d Cong., 2d sess.). The latest
published map is in that document.
   Local cooperation.-Fully complied with.
   Term ina facilities.-At Yaquina, at the mouth of the river, which
is also the head of the bay, there is a small wharf of about 50 feet
frontage owned by the Southern Pacific Co., whose branch line termi-
nates there. The port of Toledo has a public wharf in Depot Slough,
at Toledo, with frontage of about 600 feet. The city of Toledo also
has a public wharf of about 50 feet frontage on Depot Slough built
to accommodate small motorboats. There are also at Toledo two
privately owned slips having special facilities for transferring lumber
to lighters.
RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                       1483
   The existing terminals are considered adequate for present
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1914.
   The controlling depth between the mouth of the river and Toledo
is about 81/2 feet at mean lower low water in a channel 100 feet wide.
The controlling depth is adequate for existing navigation, which
consists mostly of barges used for lightering lumber from Toledo to
ocean vessels at Newport on Yaquina Bay.
   In Depot Slough the depth is about 9 feet, except for a short dis-
tance at extreme upper end of the project channel, where the depth
is about 7 feet. Above Toledo to the head of navigation the con-
trolling depth is about 2 feet in a channel 100 feet wide at mean
lower low water.
   The total cost of the work under the existing project was $70,-
699.41, of which $28,800 was for new work and $41,899.41 for main-
tenance, not including $43,200 for new work and $3,000 for mainte-
nance from contributed funds. The total expenditures have been.
$116,899.41, of which $70,699.41 were United States funds and $46,200
contributed funds,
   Proposed operations.-No funds are available, and no work is
contemplated for the fiscal year 1938.
   The sum of $15,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging, by contract, September and
October 1938.
                                        Cost and financial summary

Cost of new work to June 30, 1937 ----------------------------                                      $28, 800. 00
Cost of maintenance to June 30, 1937----------------------                                   ___     41, 899. 41
      Total cost of permanent work to June 30, 1937_______________ 70, 699. 41
Net total expenditures----------     ------      -     ------       170, 699. 41
Total amount appropriated to June 30, 1937                       __ 70, 699. 41

           Fiscal year ending June 30             1933       1934         1935               1936        1937


Cost of new work-----     -------
Cost of maintenance -_____.....
                            _            -     $11,461. 63   $12073
                                                                 .73-.    --         -



Total expended-----------------------15, 186. 97               97. 80       24. 26       .
Allotted        __   -_-----   -------------
                               _-------         8, 384.05    -101.29     -383.35


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------------- ------------------------  $15, 000, 00
  1 In addition $46,200 was expended from contributed funds, $43,200 for new work.and
$3,000 for maintenance.

                           6. YAQUINA BAY AND HARBOR, OREG.

  Location.-This bay is located on the Oregon coast, about 115 miles
south of the mouth of the Columbia River. (See U. S. Coast and
Geodetic Survey Charts Nos. 5802 and 6058.)
  Previous projects.-The River and Harbor Act of June 14, 1880,.
provided for the improvement of the entrance. Subsequent projects
were adopted by River and Harbor Acts of June 3, 1896, June 6, 1900,
and March 3, 1905. The total cost and expenditures were $713,-
 1484    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  338.96, of which $707,313.45 was for new work and $6,025.51 for
  maintenance. For further details see the Annual Report for 1893,
  part 4, page 3314, and House Document No. 68, Fifty-fourth Con-
  gress, first session.
     Existing project.-This provides for two high-tide, rubble-mound
  jetties at the entrance, 1,000 feet apart at their outer ends; the north
  jetty to be 4,700 feet in length and the south jetty to be 5,800 feet in
  length; for a spur jetty on the channel side of the south jetty 4,700
  feet from its sea end, 800 feet in length, to deepen the channel across
  the inner bar between the jetties; for five groins channelward from
  the south jetty; for the removal of subaqueous rock from the reef
between the jetties, to secure a depth of 20 feet at mean lower low
water in the entrance; and for a channel 200 feet wide and 18 feet
deep from the entrance to the railroad terminus at Yaquina, a dis-
tance of about 41/ miles. Mean lower low water is the plane of
reference.
    The mean of the higher high waters above the plane of reference
and the extreme tidal ranges at the entrance and at the head of the
bay are 8.1 feet and 12 feet, respectively.
    The estimate of cost for new work, revised in 1937, is $2,048,400
exclusive of the amount expended on previous projects. The latest
  (1919) approved estimate for cost of maintenance is $5,000 every
2 years to maintain 18 feet in the bay channel. The latest (1928)
approved estimate for annual cost of maintenance is $30,000 for
dredging in the entrance. The latest (1937) approved estimate of
cost for maintenance of the north jetty is $12,000 annually to be
applied at intervals of several years. There is no approved estimate
for maintenance of the south jetty.
    The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the improvement
of the entrance; no project was adopted (Annual Report for 1881,
p. 2589); the act of June 6, 1900, provided for rock removal at en-
trance (H. Doc. No. 110, 56th Cong., 1st sess.); the act of March 3,
1905, repealed the previous acts relating to the improvement of the
entrance, but provided for 2 years' maintenance; the act of March
2, 1919, provided for the restoration and extension of the jetties con-
structed under previous projects, rock removal in the entrance, and
dredging in the bay up to the railroad terminus at Yaquina (H. Doc.
No. 109, 65th Cong., 1st sess.); the act of August 26, 1937, provided
for extending the north jetty seaward 1,000 feet (Senate Committee
Print, 75th Cong., 1st sess.). The latest published map is in the
last-mentioned document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-Newport has about 750 feet of wharf front-
age, of which about 450 feet is publicly owned. At Yaquina (the
terminus of the Southern Pacific Co.'s branch rail line) the railroad
maintains a wharf with a frontage of about 50 feet. There are no
publicly owned terminals at Yaquina. The existing terminals are
adequate for the present commerce.
    Operations and results during fiscal year.-Operations consisted of
removal of two rock pinnacles in the entrance channel between the
jetties at a cost of $9,016.10, and of hydrographic surveys. The
costs for the year were $10,279.36. Expenditures were $11,886.35.
     RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT1485

   Condition at end of fiscal year.-The existing project is 62 percent
completed. Restoration of the present jetties was completed in 1934,
and since restoration the enrockment of both jetties has remained in
good condition. The work remaining to be done to complete the
project is the extension of the north jetty authorized by the River
and Harbor Act of August 26, 1937.
  A survey of the entrance in March 1937 shows an entrance bar
depth of 16 feet on channel range, with greater depths to the south.
Between the jetties, but south of the range, the channel depth is 20
feet. In the channel to Yaquina the controlling depth is 17 feet.
  The total cost of the work under the existing project was $1,488,-
969.65, of which $823,992.83 was for new work and $664,976.82 for
maintenance, not including $729,168.48 for new work from contrib-
uted funds. The total expenditures have been $2,218,138.13 of which
$1,488,969.65 were United States funds and $729,168.48 contributed
funds.
  Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year, together with an allotment of
$50,000 made on July 21, 1937, will be applied as follows:
Accounts payable--------------------------------------------        $27. 53
Maintenance dredging on bar and in bay channel, with Government
  plant and hired labor, August to October 1937 --------------  51,240. 00
        Total --------------------------------------------                                                     51, 267. 53
   The additional sum of $565,000 can be profitably expended during
the fiscal year 1939, as follows:
New work: Extending north jetty 1,000 feet seaward, by contract,
  during fiscal year, 215,000 tons of stone at $2.46_            $530, 000
Maintenance: Dredging on bar and in bay channel, with Government
plant and hired labor, July to September 1938------------------   35, 000
         Total -_-___---------                                                                                   565, 000

                                           Cost and financial summary

Cost of new work to June 30, 1937----------------------- 1$1, 531, 306. 28
Cost ofTmaintenance to June 30, 1937------------------------  671,002.33

         Total cost of permanent work to June 30, 1937----------                                          2, 202, 308.61

Net total expenditures ------------------------------                                         ----        2, 202, 308. 61
Unexpended balance June 30, 1937                                                                                 , 267. 53
                                                                                                               1--------------------
         Total amount appropriated to June 30, 1937-----------                                            2, 203, 576. 14

   Fiscal year ending June 30                      1933          1934            1935            1936              1937


Cost of new work .-----       ------------------
Cost of maintenance--------                  $183, 680. 79    $351, 928. 32     $6, 918. 32     $2, 283. 19      $10, 279. 36

               ....-------------
Total expended---                              145, 445. 89   394, 119. 46       6, 886. 91          676. 20      11, 886. 35

Allotted ----..-------------- ----             576, 977. 98    -3i 307. 11    -46, 245.11       51, 170. 74      -38, 859. 32


   1 In addition $729,168.48 was expended from contributed funds.
1486          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936__ ______----------                                                       $52, 013. 20
Deductions on account of revocation of allotment                                ------                    38, 859. 32

      Net amount to be accounted for------------------------                                              13, 153. 88
Gross amount expended---------------------------------------                                              11, 886. 35

      Balance unexpended June 30, 1937---------------                                                      1,267. 53
Outstanding liabilities June 30, 1937----_ -----------------------                                             7. 53

     Balance available June 30, 1937------------------- ------                                             1, 240. 00
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937------------------------------------                                           50, 000. 00
         Balance available for fiscal year 1938-----------------                                          51, 240. 00

Amount (estimated) required to be appropriated for completion
                                                                                              -- -
of existing project 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -            530, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -   530, 000. 00
   For maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - -     35, 000. 00
                   -- -- -- --------- ------------ --- --- ---- -                 - -- -- --- ---
         Total                                                                                           565, 000. 00
   2 Exclusive of available funds.

                                         7. DE POE BAY, OREG.

   Location.--This bay is located on the Oregon coast, about 100 miles
south of the mouth of the Columbia River. (See U. S. Coast &
Geodetic Survey Chart No. 5902).
   Existing project.-This provides for a basin 375 feet long, 125 feet
wide and 5 feet deep within the bay, with entrance channel of the
same depth and 30 feet in width. Mean lower low water is the plane
of reference.
    The mean of the higher high water and the extreme rise at the en-
trance above the plane of reference are about 7.8 feet and 11.5 feet,
respectively.
    The estimate of cost for new work made in 1937, is $31,000. The
latest (1937) approved estimate for annual cost of maintenance is $500.
    The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 202, 75th Cong., 1st sess.). The
latest published map is in this document.
   Local cooperation.-Conditionsof local cooperation, requiring local
interests to provide rights-of-way and suitable spoil-disposal areas
for new work and for subsequent maintenance, and to construct a
public terminal, remain to be complied with.
    Terminal facilities.-Terminal facilities consist of two small land-
ings just inside the entrance, privately owned and used by the op-
erators of excursion and fishing boats.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-No work has been done on the
project. A survey made in August 1936 shows a controlling en-
trance depth of 2 feet and, over a small area within the bay, depths
ranging from zero to 5 feet.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1938.
    The sum of $31,000 can be profitably expended during the fiscal
year 1939 in execution of the project, by contract, July to September
1938.
RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                        1487
                          Cost and financial summary

Total amount appropriated to June 30, 1937-          --    -   --------
Amount (estimated) required to be appropriated for completion
  of existing project----------------------------------             $31, 000. 00
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for new work --------------------------------       31, 000.00

                              COLUMBIA RIVER

   General description.-Thisriver rises in British Columbia, through
which it flows for 425 miles. It enters the United States in north-
eastern Washington, flows southerly to the mouth of Snake River,
thence westerly between Oregon and Washington, and empties into
the Pacific Ocean 645 miles north of San Francisco Bay and 160 miles
south of the Straits of Juan de Fuca. The total length of the river
is about 1,210 miles. (See U. S. Coast and Geodetic Survey Charts
Nos. 5902, 6151, 6152, 6153, 6154, 6155, and 6156; also Geological
Survey map of Washington.)
  8. COLUMBIA RIVER AT THE MOUTH, OREGON AND WASHINGTON

   Location.--(See U. S. Coast and Geodetic Survey Charts Nos. 5902
and 6151. For description of the Columbia River see preceding
paragraph.)
   Previous projects.-Adopted by the River and Harbor Act of July
5, 1884. Both the cost and expenditures on this project were $1,986,-
253.14, all for new work. For further details see page 1999 of
Annual Report for 1915.
   Existing project.-This provides for a channel across the bar 40
feet deep at mean lower low water and of suitable width (not less
than one-half mile), to be secured by dredging and by converging
rubble-mound jetties, the south jetty being about 7 miles and the
north jetty about 21/2 miles long, terminating 2 miles north of the
end of the south jetty. Mean lower low water is the plane of refer-
ence. The tidal range on the bar between mean lower low water and
mean higher high water is about 8 feet, and the extreme tidal range
is about 13 feet.
   The estimate of cost for new work was as follows: For the south
jetty extension revised in 1909, $8,014,164; for the north jetty, revised
in 1913, $5,966,573; and for remodeling and operating the dredge,
made in 1905, $250,000; a total of $14,230,737, exclusive of amounts
expended under previous projects. The latest (1928) approved esti-
mate for annual cost of maintenance is $6,500, to cover the cost of
hydrographic surveys only. Jetty maintenance is done only at inter-
vals of several years and is covered by special allotments.
   The existing project was authorized by the following river and har-
bor acts: The act of March 3, 1905, made final provision for the south
jetty, the construction of the north jetty, and dredging (H. Doc. No.
94, 56th Cong., 1st sess., and Annual Report for 1903, p. 2275). The
construction of the north jetty was approved July 29, 1910, and a
modification of its alinement December 27, 1913. The latest pub-
lished map is in the Annual Report for 1921 opposite page 1868.
   Terminal facilities.-Forterminal and transfer facilities see report
on Columbia and lower Willamette Rivers.
      20196-37--pt. 1----94
 1488        REPORT OF CHIEF OF ENGINEERS- U. S. ARMY, 1937

  Operations and results during fiscal year.-Operationsconsisted of
placing 10,636 tons of stone in restoring the outer 500 feet of the
south jetty and 12,737 tons of asphaltid mix in construction of an
asphaltic concrete terminal for the south jetty, completed in Septem-
ber 1936; erecting and maintaining sand fences on Clatsop Spit;
making hydrographic and beach-erosion surveys.
  The cost of maintenance work during the year was as follows:
Maintenance of south jetty--------------------------------       $145, 610. 48
Erection and maintenance of sand fences ------------------------    1,092. 50
Hydrographic surveys _---------------------------------------       4, 715. 50
Beach erosion surveys ----- ----------------------------------      2,986.
                                                                    2,      47

        Total --------------------------------------------                154,404. 95
    The total expenditures were $162,335.11.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1918 at a saving of $2,873,231 under the estimated cost.
    The inshore end of the north jetty is in good condition. On the
outer half sloughing of the enrockment into deep water along the
south side has taken place, and at the outer end for a distance of
about 1,500 feet the enrockment has been beaten down to low-water
level and below. The jetty as a whole is in fair condition. The south
jetty has been reconstructed from Clatsop Spit to a point 9,500 feet
west of the knuckle, about 3.2 miles, and this part is in good condi-
tion, with the exception that about two-thirds of the asphaltic con-
crete terminal has been demolished and beaten down to low-water
level.
    Survey of June 1937 shows the channel westward of the ends of the
jetties to have not less than the project depth of 40 feet at mean lower
low water for a width of 7,000 feet. On the outer bar a central
channel depth of 46 feet is available. Between the ends of the jetties
the central channel depth is 46 feet.
    In the throat, about 21/2 miles inside the ends of the jetties, the
position of the channel has remained practically fixed.
    Dikes constructed along the south side of Sand Island appear to
have been effective in checking erosion along the south side of the
island, and the movement of the main channel to the north.
    A draft of 35 feet is practicable at mean lower low water under
ordinary conditions. The cost of the existing project totaled $18,-
665,083.44,, of which $11,357,506.35 was for new work and $7,307,-
577.09 for maintenance. The expenditures totaled $18,664,464.66. In
addition, $475,000 and $25,000 were contributed by the ports of Port-
land and Astoria, respectively, and expended for new work.
   Proposed operations.-The balance unexpended, including ac-
counts receivable at the end of the year, together with an allotment
of $25,000 made on July 21, 1937, will be applied as follows:
Accounts payable------------------------------------------              $619. 60
    Repairs to existing dikes and shore protection at sand Island,
      by contract, August to October 1937_-------------__        __-- 12, 000. 00
    Hydrographic surveys and other field and office work, fiscal year
      1938------------------------------------                        10, 000. 00
    Building and maintaining sand fences along Clatsop Spit, fiscal
      year 1938, by hired labor----------------------__         ___    3,000. 00
         Total -       -    _- -        -        --          -     -25,      619. 60
      RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                          1489

  The additional sum of $923,000 can be profitably expended during
the fiscal year 1939 as follows:
Maintenance :
    Repairs to existing dikes and shore protection at Sand Island, by
      hired labor, July and August 1938______--_-----------------     $10, 000
    Hydrographic surveys and other field and office work, fiscal year
      1939 -------------------------        ----------------------- 10, 000
   Building and maintaining sand fences along Clatsop Spit, fiscal
      year 1939, by hired labor ____-- __ ______--__--------------      3, 000
    Repairs to north jetty and other works, by contract, fiscal year
      1939------------------------------------------------------900, 000
               Total------------------------------- ---------------------                                                      923, 000
                                      Cost and financial summary

Cost of new work to June 30, 1937------------------------                                                    1$13,343, 759. 49
Cost of maintenance to June 30, 1937 ___________-_______-__                                                         7, 307, 577.09

      Total cost of permanent work to June 30, 1937----------                                                      20, 651, 336. 58
Minus accounts payable June 30, 1937--_-- ------- _____--__                                                                618. 78

     Net total expenditures--------------------------------                                                    1   20, 650, 717. 80
Unexpended balance June 30, 1937__-------------------------                                                                619. 60
            Total amount appropriated to June 30, 1937_ ______--                                               120, 651, 337. 40

     Fiscal year ending June 30              1933                 1934                1935                 1936                  1937


Cost of new work.....--                             ..----.........................................
Cost of maintenance---- -------..      $898, 261.39          $751, 743.30      $1,241,697.01 $1,284,564.51                    $154, 404. 95

Total expended.--...-------------     i 018, 962. 36          592, 983. 65      1, 135, 670. 15       1, 541, 323. 59          162, 335. 11
Allotted ........                       903, 031. 58        1, 248, 881.82      1, 611, 000. 00         565, 000. 00 .........


Balance unexpended July 1, 1936------------- ------------            $162, 954. 71
Gross amount expended __--    ----- -----             $176, 754. 54
Less reimbursements collected                             4, 419. 43
                                                        1-------
                                                                      162, 335. 11
      Balance unexpended June 30, 1937 ________-----____                                                           --            619. 60
Outstanding liabilities June 30, 1937                                                                                             19. 60
                                                                                                                                 6_________________
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--       _____------                                                                                  25, 000. 00
Balance available for fiscal year 1938_________---_--_--______                                                               25, 000. 00
Amount that can be profitably expended in  fiscal year
                                        -- -- --
                                                       ending June
                                                  -- ---                                                                -
30, 1939, for maintenance _ - ____      2
                                                              __                                                            923, 000. 00
    1 In addition $500,000 was expended from contributed funds.
    2 Exclusive of available funds.

                                    9. SKIPANON CHANNEL, OREG.

   Location.-This channel is a tidal waterway extending south 1.8
miles from deep water in Columbia River to the city of Warrenton,
Oreg. The channel enters the Columbia about 10 miles above its
mouth and 4 miles below Astoria, Oreg. (See U. S. Coast and Geo-
detic Survey Chart No. 6151.)
   Existing project.-This provides for a channel 30 feet deep and
generally 200 feet wide extending from deep water in Columbia River
to the railroad bridge at Warrenton, Oreg., a distance of 1.8 miles,
and for a turning basin 30 feet deep and, for a distance of 4,500 feet
1490     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

via cut-off channel above the railroad bridge, a channel 6 feet deep
and generally 40 feet wide, with increased widths at log dumps and
terminals. The channels are to be obtained and maintained by
dredging and, below the railroad bridge, by the maintenance of the,
existing bulkheads by local interests. Mean lower low water is the
plane of reference. The tidal range between mean lower low water
and mean higher high water is about 8 feet; the extreme tidal range is.
about 13 feet.
   The estimated cost of new work, made in 1937, is $145,800. The
latest (1937) approved estimate of cost for annual maintenance is,
$16,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 3, 1930, provided for the channel from
deep water in the Columbia River to the railroad bridge (H. Doc.
No. 278, 70th Cong., 1st sess.); act of August 26, 1937, provided
for the channel extending upstream from the railroad bridge a dis-
tance of 4,500 feet (H. Doc. No. 201, 75th Cong., 1st sess.). The
latest published maps are contained in the above documents.
   Local cooperation.-Fully complied with insofar as the channel be-
tween the Columbia River and the railroad bridge is concerned. For
the channel above the railroad bridge the conditions of local coopera-
tion, providing necessary rights-of-way, suitable spoil-disposal areas
for new work and for subsequent maintenance and adequate log-
dumping facilities open to all on equal terms, remain to be complied
with.
   Terminal facilities.-The city of Warrenton owns a wharf with
300-foot frontage open to the public. Two privately owned lumber-
mill wharves with total frontage of 800 feet are used for lumber
shipments. In the channel above the railroad bridge the only fa-
cilities are the log dumps used by the log trucks. These facilities are
considered adequate for the present commerce.
   Operations and results during fiscal year.-Maintenance dredging
of the channel by the U. S. dredge Wahkiakum was done during
October 1936. Thei dredge removed 431,440 cubic yards of material
at a cost of $0.0465 per cubic yard. The total cost and expenditures
were $20,000, all for maintenance.
   Condition at end of fiscal year.-The existing project is 91 percent
completed. Dredging of the channel from deep water in the Colum-
bia River to the railroad bridge at Warrenton was completed in 1931
at a saving of $13,574 under the estimated cost. Survey of November
1936 showed a least depth in this channel, over a bottom width of
about 200 feet, of 29 feet at mean lower low water, over the shoal
outside the entrance to the channel, and 30 feet in the channel between
the bulkheads. A draft of 27 feet is practicable at mean lower low
water.
   No work has been done on the channel above the railroad bridge
authorized by the River and Harbor Act of August 26, 1937. Survey
of July 1935 shows a controlling depth in this channel of 1 foot over
a width of 40 feet. The costs and expenditures under the existing
project are $121,425.60 for new work and $41,104.20 for maintenance,
a total of $162,529.80.
  Proposed operations.-The sum of $15,000 allotted on July 21,
1937, will be applied to maintenance dredging, by contract, August
to October 1937.
 -RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                      1491
  The additional sum of $30,800 can be profitably expended during
the fiscal year 1939, as follows:
New work: Dredging channel from railroad bridge at Warrenton up-
  stream 4,500 feet, by contract, September to November 1938-------- $10, 800
:Maintenance: Dredging channel from Columbia River to Warrenton, by
           August to October 1938--
  ,contract,                                --                        20, 000

               Total ------------------------------------------------------                              30, 800
                                        Cost and financial summary
'Cost of new work to June 30, 1937                             ----------                          $121,425. 60
Cost of maintenance to June 30, 1937--________                         ___         _____-   -       41, 104. 20
      Total cost of permanent work to June 30, 1937_________                                       162, 529. 80
Net total expenditures                                                                                   529. 80
                                                                                                   1-------------------------------
Total amount appropriated to June 30, 1937----                                --                    162, 529. 80


           Fiscal year ending June 30             1933         1934                1935     1936          1937

'Cost of new work       ____
.Cost                    .. __-_
     of maintenance- -------------             ----           $21, 104. 20---------__------------....
                                                           _-------                                        $20,000
Total expended--.......---------------        -$115.      44   20, 988. 76 --------- _------------.         20, 000
Allotted-------------------------
         ................................        17, 988. 62     3, 115. 58 ------------  $15, 000           5,000


Balance unexpended July 1, 1936---------------------------------- $15, 000
Amount allotted from War Department Appropriation Act approved
May 15, 1936----------------------------------------------------   5, 000
      Amount to be accounted for---------------------------------                                        20,000
Gross amount expended -------------------------------------------                                        20, 000
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--------------------------------------------                                        15, 000
Balance available for fiscal year 1938                                                                    5------------------
                                                                                                           , 000
Amount (estimated) required to be appropriated for completion of
existing project 1-------________                                                                      10, 800
Amount that can be profitably expended in fiscal year ending June
30, 1939:
   For new work                                                                                          0, 800
                                                                                                        1-------------------------
   For maintenance' ---------------------------------------------                                       20,000
               Total ---------------------------------------------------                                30. 800
  1 Exclusive of available funds.

                     10. YOUNGS          BAY AND YOUNGS RIVER, OREG.

   Location.-Youngs River is a tributary of the lower Columbia
River. It empties into Youngs Bay south and west of Astoria, Oreg.,
about 10 miles above the mouth of the Columbia. The total length
of the river is about 20 miles, of which the lower 8 miles are tidal.
(See U. S. Coast and Geodetic Survey Chart No. 6151.)
   Existing project.-This provides for a channel 10 feet deep and
150 feet wide, from the Columbia River to the foot of Haven Island,
a' distance of about 21/ miles across Youngs Bay and 4 miles in
Youngs River. The plane of reference is mean lower low water.
The tidal range between mean lower low water and mean higher
high water is about 8 feet, and extreme tidal range about 13 feet.
1492       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The estimated cost of new work, made in 1932, is $5,000. The
latest (1935) approved estimate for annual cost of maintenance is
$1,800.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 209, 72d Cong., 1st sess.). The
latest published map is in the project document.
   Terminal facilities.-There are no public terminals or wharves.
The Pacific Power & Light Co. owns a wharf, about 300 feet long,
which it operates in connection with its power plant, located about
one-half mile below the highway bridge across the upper end of
Youngs Bay. Above this highway bridge there is a small privately
owned wharf, used in connection with the handling of quarry stone
by barges. There is also a fish-receiving wharf and warehouse on
the Astoria side of Youngs Bay, located just above the Spokane,
Portland & Seattle Railroad bridge, and a log-dump on the south
side of Youngs Bay, just above the highway bridge.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
project. The controlling depth is 8 feet.
   Proposed operations.--An allotment of $5,000 made during July
1937 will be applied to new work of dredging the project channel,
by contract.
   The sum of $2,000 can be profitably expended during the fiscal year
1939 for maintenance dredging of channel, by contract, during the
fall of 1938.
                              Cost and financial sumnnary
Total amount appropriated to June 30, 1937-----------               ----- -
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937----------------------------------------             $5, 000
Amount available for fiscal year 1938----------------------------5,           000

Amount that can be profiably expended in fiscal year ending June 30,
1939, for maintenance 1_   ____ ___   ___________       -    -__    2, 000'
  'Exclusive   of available funds.

        11. COLUMBIA AND LOWER WILLAMETTE RIVERS BELOW
               VANCOUVER, WASH., AND PORTLAND, OREG.

  Location.-This project embraces 1031/2 miles of Columbia River
below Vancouver, Wash., and 14 miles of Willamette River below
Portland, Oreg. For description of Columbia River see page 1487,
and of Willamette River, page 1501.
  Previous projects.-Some relief dredging was done between 1866
and 1876. Projects were adopted by the River and Harbor Acts of
June 18, 1878; July 13, 1892; June 13, 1902; and March 3, 1905.
The costs and expenditures on these projects were $1,529,413.14 for
new work and $1,214,864.79 for maintenance, a total of $2,744,277.93.
For further details see pages 1995 and 1998 of Annual Report for
1915.
  Existing project.-This provides for a channel 35 feet deep and 500
feet wide inthe Columbia River from its mouth to the mouth of the
Willamette, 99 miles, and thence up the Willamette to Portland,
about 14 miles; 30 feet deep and 300 feet wide inthe Columbia River
RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                   1493
from the mouth of the Willamette River to the interstate highway
bridge at Vancouver, Wash., about 4.5 miles, with two turning basins
of same depth at Vancouver, 800 feet wide and approximately 2,000
feet and 3,000 feet long for the upper and lower basins respectively,
and auxiliary channels 10 feet deep and 300 feet wide in the vicinity
of Cathlamet, Wash.; 30 feet deep and 300 feet wide in St. Helens
 (Oreg.) Channel, and 30 feet deep and 500 feet wide connecting the
upper end of the St. Helens Channel with the main ship channel of
the Columbia; 24 feet deep and 200 feet wide along the frontage
of the town of Rainier, Oreg., extended at its upper and lower ends
to deep water in the Columbia River, and for the construction of
stone and pile dikes and revetments. The existing project also pro-
vides for maintenance to not to exceed 35 feet depth at low water,
over such areas in the project channel of the Willamette River be-
tween its mouth and the Broadway Bridge, Portland, as have been
dredged under the existing project by the Port of Portland, no dredg-
ing to be done within 50 feet of the pierhead lines. The plane of
reference in the estuary, from the mouth to Harrington Point, is
mean lower low water; thence, to Portland and Vancouver, low
water.
   The tidal range between mean lower low water and mean higher
high water at the mouth of the Columbia is about 8 feet, and at
Portland and Vancouver about 21/2 feet at low stages of the rivers.
Extreme tidal ranges are about 13 and 3 feet, respectively. Annual
freshets have but little effect on depths at the mouth of the Columbia;
at Portland and Vancouver they average about 20 feet, while the
highest known reached a stage of 33 feet above low water.
   The estimate of cost for new work, exclusive of amounts expended
on previous projects, revised in 1937, is $3,929,000, including the dike
construction authorized in 1912 and 1922, and for a channel 35
feet deep by 500 feet wide, but not including $2,500 to be contributed
toward the auxiliary channel at Rainier, the work contributed by
the Port of Portland, nor the estimate of $750,000 for a' new dredge
authorized by Congress in 1922 for better maintenance, nor enlarge-
ment of the channel from the mouth of the Willamette to Vancouver,
authorized by the act of March 3, 1925, estimated to cost $123,000.
The latest (1937) approved estimate for annual cost of maintenance
is $817,100.
   The existing project was authorized by the following river and
harbor acts: The act of June 18, 1878, provided for the dike at St.
Helens Bar (Annual Report for 1877, p. 1019); act of July 13, 1892,
provided for the closing dike at head of Oregon Slough and dikes at
Deer Island and Walker Island (H. Does. Nos. 36 and 38, 52d Cong.,
1st sess.); act of June 13, 1902, provided for replacing the revetment
of Coon Island (H. Doc. No. 673, 56th Cong., 1st sess.) ; act of Febru-
ary 27, 1911, provided for two pipe-line dredges and accessories; and
act of July 25, 1912, provided for increasing the main channel depth
to 30 feet (H. Doc. No. 1278, 61st Cong., 3d sess.) ; act of July 27, 1916,
combined the improvements below Portland, Oreg., and between
Vancouver, Wash., and the mouth of the Willamette (without prior
report); act of August 8, 1917, provided for Cathlamet Channel (H.
1494    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Doc. No. 120, 63d Cong., 1st sess.); act of September 22, 1922, au-
thorized the construction of an additional dredge (which was not
built) and accessories for better maintenance, and the construction
of contraction works (H. Doc. No. 1009, 66th Cong., 3d sess.) ; Public
Resolution No. 105, Sixty-seventh Congress, approved March 4, 1923,
provided for the channel from deep water in Willamette Slough to
deep water in Columbia River (H. Doe. No. 156, 67th Cong., 2d sess.) ;
act of March 3, 1925, provided for a channel depth of 25 feet and
width of 300 feet from the mouth of the Willamette River to Van-
couver, Wash. (H. Doc. No. 126, 68th Cong., 1st sess.); act of March
3, 1927, authorized the closing of the east channel at Swan Island
in the Willamette River, on condition that the main channel be opened
to project dimensions on the west side of the island by the port of
Portland (Rivers and Harbors Committee, Doc. No. 10, 69th Cong.,
2d sess.) ; act of July 3, 1930, provided for a 35-foot channel 500 feet
wide from Portland to the sea (H. Doc. No. 195, 70th Cong., 1st sess.,
and Rivers and Harbors Committee Doc. No. 8, 71st Cong., 1st sess.) ;
act of August 30, 1935, provided for a channel in the Columbia River,
from the mouth of the Willamette to the interstate highway bridge at
Vancouver, Wash., 30 feet deep and 300 feet wide, with two turning
basins at Vancouver (Rivers and Harbors Committee Doc. No. 1,
74th Cong., 1st sess.), for maintenance of not to exceed 35 feet deep at
low water in Portland Harbor and Willamette River between its
mouth and Broadway Bridge it Portland (Rivers and Harbors Com-
mittee Doc. No. 6, 73d Cong., 1st sess.), and for auxiliary channels, 30
feet deep, 300 and 500 feet wide, at St. Helens (H. Doc. No. 235, 72d
Cong., 1st sess.) ; and the act of August 26, 1937, provided for extend-
ing the lower turning basin at Vancouver, Wash., 1,000 feet down-
stream (Rivers and Harbors Committee Doc. No. 81, 74th Cong., 2d
sess.), and for an auxiliary channel, 24 feet deep and 200 feet wide,
along the waterfront at Rainier, Oreg. (H. Doc. No. 203, 75th Cong.,
1st sess.).
   Prior to the enlarged project adopted by the River and Harbor
Act of August 30, 1935, the provision of a channel 28 feet deep and
300 feet wide from the mouth of the Willamette River to Vancouver,
with two turning basins, each generally 28 feet deep, 800 feet wide,
and 2,000 feet long (H. Doc. No. 249, 72d Cong., 1st sess.), was au-
thorized September 6, 1933, by the Public Works Administration.
   For latest published maps see House Documents Nos. 879, Sixty-
third Congress, second session; 195, Seventieth Congress, first ses-
sion; 235 and 249, Seventy-second Congress, first session; Rivers and
Harbors Committee Documents Nos. 6, Seventy-third Congress, first
session; and 81, Seventy-fourth Congress, second session, and House
Document No. 203, Seventy-fifth Congress, first session.
   Local cooperation.-The 35-foot-channel maintenance in Willamette
River, authorized by the River and Harbor Act of August 30, 1935,
is subject to the requirement that local interests shall furnish free of
cost to the United States the necessary areas for disposal of dredged
material from the Willamette River, and that the Port of Portland
shall assist in the work of maintaining project channels in the Wil-
lamette River, and in the Columbia River below, by loaning to the
United States, when required, a suitable pipe-line dredge in good
RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                1495
operating condition, with full crew and equipment, without charge,
other than reimbursement to the Port of Portland for the operating
costs of such dredge on a basis approved by the Chief of Engineers.
 (Rivers and Harbors Committee Doc. No. 6, 73d Cong., 1st sess.)
Under provisions of the River and Harbor Act of August 26, 1937, the
auxiliary channel along the Rainier (Oreg.) water front is subject to
the requirements that local interests contribute $2,500 toward the
cost of the improvement and furnish suitable spoil-disposal areas for
new work and for subsequent maintenance (H. Doc. No. 203, 75th
Cong., 1st sess.), and extension of the lower turning basin down-
stream for a distance of 1,000 feet is subject to the condition that
local interests furnish suitable spoil-disposal areas for new work and
for subsequent maintenance and that the work shall not be under-
taken until the Chief of Engineers is assured that local interests are
ready to proceed with the construction of a new terminal on the
extension to the basin (Rivers and Harbors Committee Doc. No. 81,
74th Cong., 2d sess.). All prior requirements have been fully com-
plied with.
    Terminal facilities.-At Portland, Oreg., there are under public
ownership three terminals for general cargo. There is one drydock
of 10,000 tons and another of 15,000 tons capacity, both under public
ownership and operation. Under private ownership, but open to the
public on equal terms, are 9 general cargo, 5 grain and flour, 6
lumber, 1 cement, and 9 crude-oil and gasoline terminals, besides out-
fitting and storage wharves.
    At Astoria, Oreg., there is a large municipal terminal with grain
elevator and flour mill. There are also private wharves used for ship-
ment of canned salmon, lumber, and flour, and for the receiving of
coal, oil, and general merchandise.
  " At Vancouver, Wash., there are two municipal terminal wharves.
There are also privately owned wharves for shipment of lumber and
other commodities, and a privately owned grain elevator and wharf.
    At Kalama, Wash., there is a municipal wharf, for shipment of
lumber.
    The port of Longview has a public terminal on the Columbia River
at Longview, Wash., and the Long-Bell Lumber Co. and Weyer-
haeuser Timber Co. have wharves in the same vicinity for the ship-
ment of lumber.
    At other small towns on the Columbia River between Portland and
Astoria there are sufficient private facilities to accommodate the river
steamers, and at seven points there are large sawmill docks used
entirely for the shipment of lumber in ocean-going carriers.
    These facilities, with the planned extensions, are considered ade-
quate for the present needs of commerce. (For further details see
Port Series No. 11, Corps of Engineers.)
    Operations and results during fiscal year.-With regular funds,
maintenance dredging was done by the U. S. dredges Wahkiakum,
Clatsop, Col. P. S. Michie, Mackenzie and Monticello in all bars or
channels where surveys indicated considerable shoaling. The total
excavation was 4,255,397 cubic yards, of which 4,226 cubic yards were
removed from Columbia Slough by the dredge Monticello, under au-
thority of section 3, River and Harbor Act of July 3, 1930. In addi-
1496        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

tion, under lease agreement, the Port of Portland dredge Columbia
worked in Willamette River, from the mouth to Broadway bridge at
Portland, excavating 2,447,606 cubic yards.
   Dike repairs were made at Morgans and Willow bars; revetment
stone was placed at Sand Island; operation of the hydraulic model
at Berkeley, Calif., was continued and annual surveys made.
    Cost of the work done, all maintenance, was as follows:
Dredging, including surveys----------------------------------                                        $469, 115. 81
Dike repairs--_____----------------                                                                     3,809. 15
Revetment---------------------------- ----------------------                                           29,968. 27
Operation of hydraulic model-----------------------------                                               8, 916.74

        Total      -------------         ------             -----------------------                   511, 809. 97
  The expenditures were $509,766.95.
  Condition at end of fiscal year.-The existing project is 98 percent
completed. The 35- by 500-foot channel project was completed in
1933, except that a channel revision at Harrington Point was made
in 1935 with Public Works funds. A total of 136 dikes have been
constructed, including 5 built by the Port of Portland and 10 by the
Port of Vancouver.
  The channel is in good condition. A draft of 30 feet is practicable
at low tide throughout the year and at high tide a draft of 32 feet is
practicable. In the Columbia below the mouth of Willamette River
the least depth referred to low-water datum at end of June 1937 was
30 feet. At the existing stage of river the least depth was 33 feet at
low tide. Above the mouth of the Willamette River the Vancouver
Channel has a controlling depth of 30 feet. In the Willamette River
a depth of 35 feet at low water is available.
  There remains to complete the existing project the dredging of
auxiliary channels at St. Helens and Rainier, and the extension of the
lower turning basin at Vancouver.
  The total costs under the existing project to June 30, 1937, are
as follows:

                                                             New work            Maintenance             Total

United States funds:
   Regular _________         .____________
                                        _______              $3, 263, 606. 57     $8,278, 983.00      $11, 542, 589. 57
   Public Works__          -
                       .________-__- _ ______---_-__             446, 296. 19   ...                        446, 296. 19
   Emergency Relief---------_ __-__----____                   - 138, 449, 04          98, 667. 57          237, 116. 61
     Total United States funds------------.... ----          3, 848, 351. 80       8, 377, 650. 57     12, 226, 002. 37
Contributed funds_-------___ __ -- --------------.               98, 527. 20           24, 319. 82         122, 847.02
     Total, all funds__---.
                         -    ______-------__          __     3, 946, 879. 00      8, 401, 970. 39     12, 348, 849. 39



  The expenditures have been $11,539,218.11 from regular funds,
$446,296.19 from Public Works funds, and $237,116.61 from Emer-
gency Relief funds, a total of $12,222,630.91 from United States
funds, and $122,847.02 from contributed funds, a total of $12,345,-
477.93.
  Proposedoperations.-The balance unexpended, including accounts
receivable at the end of the year, together with an allotment of
$550,000 made during July 1937, will be applied as follows:
    RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                    1497

Accounts payable----------------------------------------------$3, 380. 54
New work: Dredging auxiliary channel at St. Helens, by contract__ 50, 000.00
.Maintenance :
    Dredging channel in Portland Harbor and in Columbia River
       where necessary between Vancouver, Wash., and the mouth
       by Government plant and hired labor, July 1937 to June 1938- 445, 000.00
    Repairs to existing dikes and other works by contract, Sep-
       tember 1937 to April 1938------------__                       16, 277.34
    Hydrographic surveys, operation of U. S. survey boat Robert
       Gray, fiscal year 1938--------------------------------_       40, 000.00
                Total------------------------------------------------                                             554, 657. 88
   The additional sum of $850,700 can be profitably expended during
the fiscal year 1939 as follows:
New work :
       Dredging auxiliary channel at Rainier by Government plant and
           hired labor, October 1938                         -                  _________-_
                                                                           -_____-_______                               $8, 700
       :Dredging extension to lower turning basin at Vancouver by Gov-
          ernment plant and hired labor, September 1938_______________- 22, 000
        Total for new work-----___ -----------------------------------                                                  30, 700
Maintenance :
    Dredging channel in Columbia River where necessary between Van-
      couver, Wash., and the mouth by Government plant and hired
           labor, July 1938 to June 1939                                              ___------------                 600,000
       Dredging channel in Willamette River where necessary between
         its mouth and the Broadway Bridge at Portland, by Port of
         Portland plant under lease, July 1938 to January 1939 -_______ 150, 000
       Repairs to existing dikes and other works, by contract, September
         and October 1938 ___________      _______________________       30, 000
       Hydrographic surveys, operation of U. S. survey boat Robert Gray,
           fiscal year 1939 ----------------------                                                                      40, 000

              Total for maintenance___________________________                                                        820, 000
              Total for new work and maintenance                                _____________________                 859. 700
                                          Cost and financial summary
Cost of new work to June 30, 1937_________________       __                                                  $5, 377, 764.94
Cost of maintenance to June 30, 1937 _______________________                                                 29, 592, 515. 36

      Total cost of permanent work to June 30, 1937---------                                             3   14, 970, 280. 30
Minus accounts payable June 30, 1937-----------------------                                                        3, 371.46

      Net total expenditures_________--_---------------------------2314, 966, 908. 84
Unexpended balance June 30, 1937      __-------------------------          4, 657. 88
           Total amount appropriated to June 30, 1937-----------12 14,971, 566. 72

    Fiscal year ending June 30                 1933                1934              1935            1936              1937


Cost of new work---- --......--           - $370, 210. 46    $428, 196. 13         $18, 100. 06   $138, 449. 04   ..............
Cost of maintenance......------------..      447, 079. 33     576, 115. 29       4 524, 523. 27    496, 480. 19        $511, 809. 97
       Total cost_----------------          817, 289. 79    1,004, 311. 42        542, 623. 33     634, 929. 23       511, 809. 97
'Total expended..------.....----------.     829, 019. 09         753, 940. 70      62, 712. 86     641, 760. 76       509, 766. 95
Allotted.-----.      ---------------      1, 480, 071. 37     854, 996. 92       -103, 707. 42     503, 434. 67      -95,000.00

  1 Includes $446,296.19 P. W. funds and $138,449.04 E. R. funds.
  2 Includes $98,667.57 E. R. funds.
  2 In addition  $122,847.02 expended from contributed funds-$98,527.20 for new work
and $24,319.82 for maintenance.
   SDeduction of $18,591.77 from 1935 costs account disallowance on claim for liquidated
damages.
1498        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936_______________                           $609, 424. 83-
Amount allotted from War Department Appropriation Act
approved May 15, 1936------------------------------                        1, 000. 00

     Amount to be accounted for----        -.     ---                     610, 424. 83
Deductions on acount of revocation of allotment-----------                 96, 000. 00

      Net amount to be accounted for_                                     514, 424. 83
Gross amount expended______________________ $510, 800. 92
Less reimbursements collected__                 , 033. 97
                                               1------------___
                                                                          509, 766. 95
      Balance unexpended June 30, 1937                                      4, 657. 88
Outstanding liabilities June 30, 1937_                                      3, 380. 54

     Balance available June 30, 1937_____-_____________                     1,277. 34
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937_______________                                550, 000. 00
       Balance available for fiscal year 1938 ____               .____    551, 277. 34
Amount (estimated) required to be appropriated for com-
pletion of existing project                                             x 30, 700. 00

Amount that can be profitably expended in fiscal year end-
ing June 30, 1939:
   For new work________________         __                                530, 700. 00
      For   maintenance_    -__                                          5820, 000'. 00
        Total_______ __                                                  5 850, 700. 00
  5
   .Exclusive of available funds.
  * In addition local interests required to contribute $2,500.

                         12. WESTPORT SLOUGH, OREG.

   Location.-Westport Slough is a side channel of the Columbia
River located about 70 miles below Portland, Oreg. (See U. S. Coast
and Geodetic Survey Chart No. 6152).
   Existing project.-This provides for a channel 28 feet deep and
generally 200 feet wide, from deep water in the Columbia River to
the ferry dolphin immediately downstream from the Westport Lum-
ber Co. wharf, a distance of about 3,500 feet. Low water is the plane
of reference.
   The average tidal range during low water conditions in the Colum-
bia River is about 5 feet.
   The estimated cost for new work made in 1937, is $16,300. The
latest (1937) approved estimate of cost of annual maintenance is
$5,000.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 79, 75th Cong., 1st sess.). The
latest published map is in this document.
   Local cooperation.-Conditionsof local cooperation, requiring local
interests to provide suitable spoil-disposal areas and to dredge and
maintain a channel 28 feet deep and 150 feet wide from the ferry
dolphin to the upper end of the Westport Lumber Co. wharf, remain
to be complied with.
   Terminal facilities.-The only terminal is the privately owned
wharf of the Westport Lumber Co. There is no need at present for
additional terminals.
   Operations and results during fiscal year.-None.
 RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                     1499
   Condition at end of fiscal year.-No work has been done on the
project.
  A survey made in August 1937 shows a controlling depth of 25
feet on the channel range.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1938.
  The sum of $16,300 can be profitably expended during the fiscal
year 1939 in execution of the project, by contract, September to De-
cember 1938.
                         Cost and financial summary

Total amount appropriated to June 30, 1937__
Amount (estimated) required to be appropriated for completion
                                         -_________
  of existing project _______________ -_--$16,                             300
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work---------------------------------------------       16, 300

                     13. CLATSKANIE RIVER, OREG.

   Location.-This river rises in the Coast Range in Oregon, flows
northwesterly about 28 miles, and empties through Beaver and Wal-
lace Sloughs into the Columbia River about 50 miles from the mouth.
 (See U. S. Coast and Geodetic Survey Chart No. 6152.)
   Previous projects.-Adopted by River and Harbor Act of March
3, 1899. The total cost and expenditures were $39,026.29, of which
$15,537.30 was for new work and $23,488.99 was for maintenance.
For further details of original project, see page 2000 of annual report
for 1915.
   Existing project.-This provides for dredging and maintaining a
through channel 6 feet deep and 40 feet wide from the town of Clats-
kanie to Columbia River, a distance of about 4 miles. Low water is
the plane of reference. The maximum variation of water levels due
to tides is about 5 feet, and to freshets in the Columbia River about 10
feet.
   The estimate of cost for new work, made in 1915, was $4,620. The
latest (1924) approved estimate for annual cost of maintenance is
$7,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for improvement
below Clatskanie (H. Doc. No. 218, 55th Cong., 2d sess.) ; act of June
25, 1910, provided for dredging from Clatskanie to the railroad
bridge (H. Doc. No. 633, 61st Cong., 2d sess.); act of July 18, 1918,
provided for the maintenance from the mouth to Clatskanie without
prior printed report; and the act of September 22, 1922, provided for
improvement and maintenance from the town of Clatskanie to the
Columbia River (H. Doc. No. 698, 64th Cong., 1st sess.). The latest
published map is in the last-mentioned document.
   Terminal facilities.-A wharf and a warehouse at Clatskanie are
owned by a transportation company. On Beaver Slough there are
five private wharves which have regular steamboat service. The
terminal facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The only operations
consisted of making hydrographic surveys. The costs and expendi-
tures were $113.71.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1924 at a saving of $917 under the estimated cost. The chan-
1500                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

nel is in fair condition, with project width and depth available. Cost
of the existing project was $53,441.34, of which $3,703.34 was for new
work and $49,738 for maintenance. The expenditures were $53,441.34.
  Proposed operations.-No work is contemplated for the fiscal year
1938.
  The sum of $6,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging, by contract, April to June 1939.
                                                    Cost and financial summary

Cost of new work to June 30, 1937-------------------------------                                               $19, 240. 64
Cost of maintenance to June 30, 1937----------------------------                                                73, 226. 99

           Total cost of permanent work to June 30, 1937-------------- 92, 467. 63
Net total expenditures---------____- _    -                                           -       -      --  _- 92, 467. 63
Unexpended balance June 30, 1937------ ____                                               -_____________
                                                                                                  --            102.34

            Total amount appropriated to June 30, 1937------------------92, 569. 97

           Fiscal year ending June 30                        1933         1934             1935         1936          1937


Cost ofnew work....................
Cost of inaintenance...........-------.....------...--..
                                                             .   ----
                                                           $1, 538. 42
                                                                             - ---
                                                                         $2, 180. 19
                                                                                       . ---- .
                                                                                     $3,235.98 $3, 996. 78             $113. 71

Total expended...--------------------                       1, 586. 35   2, 117. 66       3, 250. 58   3,996. 78        113. 71

Allotted----....-           . -------------------           5, 655. 14     -20. 24        5, 319. 69   4, 000.00    -3, 787.17



Balance unexpended July 1, 1936    _______   _______     ___    __   $4, 003.22
Deductions on account of revocation of allotment ------------------- 3, 787. 17

      Net amount to be accounted for ......___....-__-                                                               216. 05
Gross amount expended ___     --        -------------                                                                113. 71
           Balance unexpended June 30, 1937                                                                           02. 34
                                                                                                                     1-----------
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ___________-
                             --         ________-__--______    __                                                  6, 000. 00
    1 Exclusive of available funds.

                                      14. MULTNOMAH CHANNEL, OREG.

  Location.-Multnomah Channel, formerly known as Willamette
Slough, is a back channel 22 miles long connecting the Columbia
River near the town of St. Helens, Oreg., with the Willamette River
at the north boundary of the city of Portland, Oreg. (See U. S.
Coast and Geodetic Survey Chart No. 6154.)
  Existing project.--This provides for the removal of sunken logs
throughout the waterway; for a channel at the Columbia end 300 feet
wide and 25 feet deep, extending for a distance of about 5,000 feet;
and for a channel at the Willamette end 250 feet wide and 25 feet
deep, extending for a distance of about 9,500 feet. Low water is the
plane of reference. The tidal range between mean lower low water
and mean higher high water at St. Helens is about 3 feet at low stages
of the Columbia and Willamette Rivers, and the extreme range about
31/2 feet.
   The estimate of cost for new work, made in 1932, was $20,000. The
latest (1935) approved estimate for annual cost of maintenance is
$3,300.
 RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                                        1501

   The existing project was authorized by the Public Works Admin-
istration February 15, 1935, and by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 47, 72d
Cong., 1st sess.). The latest published map is contained in the
project document.
   Terminal facilities.-Near the north end of the channel, 4,000 feet
above the mouth and near St. Helens, Oreg., the St. Helens Pulp &
Paper Co. has a wharf with 500 feet frontage. The St. Helens
creosoting plant at the mouth of Scappoose Bay on Multnomah
Channel has a mooring place for tankers of moderate draft. Near
the south end of the channel the quay wharf of the B. F. Johnson
Lumber Co., 300 feet in length, is the only terminal used for making
ocean shipments. Other facilities on the channel consist of exten-
sive log booms parallel with the banks in several places, and used for
the rafting and temporary storage of logs. All the existing facilities
are privately owned and are sufficient for the present traffic.
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.-The existing project was completed
during the fiscal year 1935 at a saving of $1,887.72 under the estimated
cost. The project depth of 25 feet and channel widths of 250 feet at
the south end and 300 feet at the north end are available. Depths in
the remainder of this channel vary from 8 to 50 feet. A draft of 23
feet is practicable at low water at each end of the channel, and in the
balance of the channel depths are sufficient to accommodate river
steamers.
   The total cost and expenditures for the existing project were
$18,112.28, all for new work, from Public Works funds.
   Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
   The sum of $10,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging and snag removal with Govern-
ment plant and hired labor, October to November 1938.
                                               Cost and financial summary
Cost of new work to June 30, 1937 -------------------------                                                                        $18,112. 28
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937---------------                                                                  18, 112. 28
Net total expenditures__--------------------------                                                                                  18, 112. 28
Total amount appropriated to June 30, 1937    -----                                                                                 18, 112. 28

           Fiscal year ending June 30                               1933            1934            1935               1936                1937


Cost of new work .----------------                         ------------------------               $18, 112. 28
Cost of m aintenance                                            ----              .------------ -----------...
                                                                                                     .. .. . ..   ..    ..    ..   .. ..   ..   ..   .

Total expended------------------------------------------                                          16, 881. 01     $1, 231. 27        -
Allotted----------..................------------------------------------
                                                             .......-----------....               20, 000. 00     -1,887. 72


Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance       ----------------------------------       $10, 00
  15. WILLAMETTE RIVER ABOVE PORTLAND, AND YAMHILL RIVER,
                           OREG.
  Location.-The Willamette River rises in the Cascade Range in
southwestern Oregon, flows northerly, and empties into the Columbia
1502    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

River about 100 miles from the sea. Its length from the source of
the middle fork is about 294 miles. (See U. S. Coast and Geodetic
Survey Chart No. 6155 and the U. S. Geological Survey Map, State
of Oregon.)
   The Yamhill River rises in the Coast Range, flows easterly, and
empties into the Willamette River about 42 miles above Portland. Its
length from the source of the south fork is about 52 miles.
   Previousprojects.-Forthe Willamette River, adopted by the River
and Harbor Acts of March 3, 1871, and July 13, 1892. The cost and
expenditures were $247,747.51 for new work. For further details
see page 1997 of annual report for 1915.
   Existing project.-This provides for improvement of Willamette
River between Portland (14 miles above the mouth) and Oregon City
 (26 miles above the mouth) by a channel 8 feet deep at low water, 200
feet wide below Cedar Island, and 150 feet wide thence to Oregon
City; and for a channel 21 to 31/2 feet deep at low water and of no
prescribed width from Oregon City to Corvallis (132 miles above the
mouth); by snagging between Corvallis and Harrisburg (163 miles
above the mouth); by the removal of Copeleys Rock, 9 miles above
Portland; and by necessary dredging, snagging, dike, and revetment
work between Portland and Corvallis. The project also provides for
a channel in Yamhill River 4 feet deep at low water and 60 feet wide
from its mouth to McMinnville (18 miles) to be secured by means of
a lock and dam near Lafayette and the removal of obstructions. The
section of Willamette River in the vicinity of Willamette Falls at
Oregon City is covered by a project described on page 1505 of this
report.
   The following table shows the principal features of the lock and
dam in Yamhill River:
Location: 1/2 miles below Lafayette, Oreg., 8 miles above the mouth.
Usable lock dimensions: One lock 175 by 40 feet.
Lift of lock: 16 feet.
Depth on sills at low water: 4 feet on upper sill; 2 feet on lower sill.
Character of foundation: Timber piling in clay.
Kind of dam: Fixed.
Type of construction: Timber crib.
Date of completion: September 21, 1900.
Cost: $72,164.83.
   For the Willamette River below the falls at Oregon City ordinary
fluctuation of stage of water is 15 feet and the extreme fluctuation
due to flood conditions 35 to 50 feet. Above Oregon City the ordi-
nary fluctuation is 12 to 20 feet and the extreme is 20 to 27 feet. For
the Yamhill River the ordinary fluctuation is 35 feet and the extreme
48 feet. Tidal changes vary from about 21/2 feett at the mouth of the
Willamette to zero 26 miles above the mouth.
   The estimate of cost for new work, revised in 1930, is $459,300,
exclusive of the amount expended on previous projects. The latest
 (1932) approved estimate for annual cost of maintenance is $84,000,
including $4,000 for operation and care of the lock and dam in Yam-
hill River.
   The existing project was adopted by the following river and har-
bor acts: The act of June 3, 1896, provided for the improvement of
Willamette River above Oregon City (H. Doc. No. 260, 54th Cong.,
1st sess., and Annual Report for 1896, p. 3309) and Yamhill River
 (Annual Report for 1895, p. 3602) : act of July 25, 1912, provided for
 RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                1503
a 6-foot channel in the Willamette River below Oregon City (H. Doc.
No. 438, 62d Cong., 2d sess.). The project was modified in 1904 by
abandoning the 20-mile stretch of the river between Harrisburg and
Eugene as unworthy of improvement (Annual Report for 1904, p.
3529); and the act of July 3, 1930, provided for the 8-foot channel
 (H. Doc. No. 372, 71st Cong., 2d sess.). Operation and care of the lock
and dam in Yamhill River were included in the project July 1, 1935,
under the provisions of the Permanent Appropriations Repeal Act,
approved June 26, 1934. For latest published map see the last-men-
tioned document.
   Terminal facilities.-Between Portland and Willamette Falls the
terminals are privately owned mill wharves and oil-receiving sta-
tions. Above the falls there are small wharves privately owned or
natural landings. These facilities are considered adequate for the
existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
in Willamette River between Portland and Independence, Oreg., con-
sisted of the removal of 80,275 cubic yards, mostly gravel, by the U. S.
dredge Monticello at a cost of $16,446.87; 38,756 cubic yards by con-
tract at a cost of $11,983.01. Other maintenance work consisted of the
removal of 743 snags from Willamette and Yamhill rivers at a cost of
$1,409.20 and repairs to existing dikes at a cost of $12,596.26. Hydro-
graphic surveys were made at a cost of $15,071.73. These operations
resulted in maintaining the project depths of 8 feet at low water to
Oregon City and 31/2 feet at low water between Oregon City and
Independence. Due to the controlling depth of 2 feet at low water on
the lower miter sill at the Yamhill lock, only 2 feet depth at low water
was maintained in the Yamhill River between the locks and the mouth.
This depth is considered ample for the existing log traffic.
   Experimental channel stabilization by bank protection was tried on
two bends of the river. Final results of the experiments have not been
ascertained, due to high water conditions; however, some raveling
along the toe has been noted. The cost of this bank protection work
was $13,842.97.
   Minor repairs were made to the lock, dam, and buildings on Yam-
hill River. The new lock gates were completed in 1935 and the lock
has been in continuous operation since that time, except for short
periods during high water. The cost for maintenance, from regular
appropriation for maintenance and improvement of river and harbor
works, was $71,350.04, and for operating and care, from regular ap-
propriation, $3,479.42.      Expenditures from regular funds were
$80,995.11.
   Condition at end of fiscal year.-The existing project is about 95
percent completed. The new work on the 8-foot channel, Portland
to Oregon City, is about 95 percent completed. Removal of Copeleys
Rock will complete the existing project. The controlling depths at
low water on upper Willamette River at the end of the year were
8 feet between Portland and Oregon City (12 miles); 21/2 feet from
Oregon City to Independence (72 miles); and on Yamhill River, 2
feet from its mouth to McMinnville (18 miles). Traffic above Salem
is confined to log rafts and occasional launches. The river is open
between Salem and Corvallis (47 miles), but the steeper slope of the
river above Corvallis discourages traffic. The controlling depth be-
tween Salem and Corvallis is about 1 foot pit low water.
      20196-- 37-pt. 1--95
1504        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The bank revetments at Independence and Wheatland are in fair
condition. The dam at Wheatland is in poor condition. The lock
and dam in Yamhill River were completed in 1900. The depth over
the upper miter sill at low water is 4 feet and 2 feet over the lower
miter sill. The lock, dam, and grounds are in good condition. The
lock was in service during the entire year except for short periods
during high water. It is used principally for the passage of log rafts.
   The total cost of the existing project was $2,019,538.18, of which
$4371606.35 was for new work and $1,581,931.83 for maintenance, in-
cluding $7,291.83 for operating and care. The total expenditures
were $2,019,076.70, all from regular funds.
   In addition, the sum of $106,433.23 was expended between Septem-
ber 24, 1900, to June 30, 1935, on the operation and care of the works
of improvement under the provision of the permanent indefinite
appropriation for such purposes.
  Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year, together with an allotment of $90,000
made on July 21, 1937, will be applied as follows:
Accounts payable-------------------------------------------------           $969. 99
Maintenance :
   Repairs to dikes, dams, and revetments in Willamette River, be-
      tween Newberg and Independence, by Government plant and
      hired labor, July 1 to Sept. 30, 1937, and Apr. 1 to June 30,
       1938----------------------------------------                  --   10, 000. 00
    Dredging in Willamette River between Portland and Inde-
      pendence, and in Yamhill River, by contract and Government
      plant and hired labor, July 1 to Sept. 30, 1937, and Apr. 1
       to June 30, 1938----------------------             --    --        57, 614. 57
   Snagging in Willamette River, with Government plant and hired
      labor, between Portland and Harrisburg, July 1, 1937, to June
      30, 1938-------------------------------------------------- 5, 000. 00
   Experimental bank protection, by contract, Aug. 15 to Oct. 15,
      1937------------ -- --------------------------------------- __ 12, 500. 00
    Surveys in Willamette River, between Portland and Albany, and
      in Yamhill River, July 1, 1937, to June 30, 1938-------------- 8, 500. 00
                                                                     94, 584. 56
Operating and care of lock and dam in Yamhill River:
   Maintenance:
         Operation of lock and dam------------------------------- 3, 100. 00
         Ordinary maintenance and repair-------------------------        800. 00
         Emergencies----------------------------------------------100. 00
                                                                      4, 000. 00
                     Total--------------------------------------------    98, 584. 56
  The additional sum of $124,000 can be profitably expended dur-
ing the fiscal year 1939 as follows:
Maintenance:
   Repairs to dikes, dams, and revetments between Newberg and
      Independence, by Government plant and hired labor, July 1 to
      Sept. 30, 1938, and Apr. 1 to June 30, 1939------------------- $10, 000
   Dredging in Willamette River between Portland and Albany, and in
      Yamhill River, by contract and Government plant and hired labor,
      July 1, 1938, to Sept. 30, 1938, and Apr. 1 to June 30, 1939------ 86, 000
    Snagging, with Government plant and hired labor, between Port-
      land and Harrisburg, July 1, 1938, to June 30, 1939-------------    8, 500
    Surveys, Willamette River, between Portland and Corvallis and in
      Yamhill River, July 1, 1938, to June 30, 1939_-_-_._               15, 000
                                                                            119, 500
    RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                             1505
Operating and care of lock and dam in Yamhill River:
    Maintenance:
      Operation of lock and dam--      _______--------------                                               _      $3, 400
        Ordinary maintenance and repair-__          -___---                                    ___-__              1, 000
        Emergencies --------------------------                                                                        100

                                                                                                                   4, 500
                     Total------------------                      ----------------------                        124,000
                                      Cost and financial summary

Cost of new work to June 30, 1937 --------  ------------------
Cost of maintenance to June 30, 1937---- ------------          _                                    11,$685, 353. 86
                                                                                                        688, 365.06
      Total cost of permanent work to June 30, 1937-----------2, 373, 718. 92
Undistributed costs June 30, 1937--------  -----                      369. 88
      Net total cost to June 30, 1937----------------------                                          2, 374, 088.80
Minus accounts payable June 30, 1937-------------------------                                                831. 36
     Net total expenditures_ ____-__-____-___________- -12,                                               373, 257. 44
Unexpended balance June 30, 1937-------------------------                                                   8,584. 56
           Total amount appropriated to June 30, 1937_---                              __-_-        12, 381, 842. 00

    Fiscal year ending June 30           1933            1934             1935               1936                1937


Cost of new work___... .______..       $22, 990. 90   $153,562.14 _
Cost of maintenance .--... _            90, 075. 96    112, 166. 27 $127, 535. 21       $118, 844. 41           $74, 829. 46
       Total cost__----------------    113, 066. 86    265, 728. 41     127, 535. 21       118, 844. 41          74, 829. 46
Total expended ....----------------    115, 361. 66    261, 446. 23      38, 622. 47       131, 397. 45          80, 995. 11
Allotted-..__---..    ---------        356, 832. 05     97, 811. 61      68, 355. 96        85, 578. 72    -- ---
                                                                                                           .



Balance unexpended July 1, 1936 ----------------------------                                              $89, 579. 67
Gross amount expended------------------------$81, 946. 18
Less reimbursements collected----------------------    951. 07
                                                                                                           80, 995. 11
      Balance unexpended June 30, 1937-----------------------                                                  8, 584. 56
Outstanding liabilities June 30, 1937 ----------------    ------                                                  969. 99
     Balance available June 30, 1937-------------------_                                                       7,614. 57
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------  ----------- _                                                   90,000. 00
     Balance available for fiscal year 1938--------------------                                            97, 614. 57
Amount that can be profitably expended in fiscal year ending
                                      - - - --- -- - - - - - - --
June 30, 1939, for maintenance 2                                 -_ __                                   124, 000. 00
   1 Includes $106,433.23 costs and expenditures from permanent indefinite appropriation.
   2 Exclusive of available funds.

            16. WILLAMETTE RIVER AT WILLAMETTE FALLS, OREG.

   Location.-The locks and dam covered by this project are located
at Willamette Falls, a rocky reef in the Willamette River at Oregon
City, Oreg., about 26 miles above the mouth of the river.
  Existing project.-This provides for the purchase, rehabilitation,
and deepening to 6 feet at low water of the existing canal and locks
1506      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and the separation of the canal from the water-power intake by the
construction of a concrete division wall. The total length of the
canal and locks is about 3,500 feet. The following table shows the
principal features of the canal and locks at Willamette Falls:
  Usable lock dimensions: Series of four locks, each 175 by 37 feet.'
  Lift of each lock: Lock no. 1 (lower), 22.5 feet;2 lock no. 2, 8.7 feet; lock
no. 3, 10.9, feet; lock no. 4 (upper), 8.1 feet.
  Depth on miter sills at low water: Lower lock, 8.4 feet; upper lock, 6 feet.
  Character of foundation: Rock.
  Kind of dam: Fixed.3
  Type of construction: Concrete.
  Year of completion: 1873. Purchased by United States April 26, 1915.
  Cost : Unknown. Purchase price, $375,000.
  The ordinary fluctuation of the stage of water above the locks is
12 feet, and the extreme, due to flood conditions, 20 feet. Below the
locks the ordinary fluctuation is 15 feet and the extreme 50 feet.
    The estimate of cost for new work, made in 1912, was $680,000.
This includes the price paid for the canal and locks. The estimate
of annual cost of operation and care, inade in 1937, is $36,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the purchase and
rehabilitation of the system and the construction of the concrete divi-
:sion wall (H. Doc. No. 202, 56th Cong., 1st sess., and Annual Report
for 1900, p. 4374); and the act of August 8, 1917, provided for the
deepening of the locks (H. Doc. No. 1060, 62d Cong., 3d sess.). Op-
eration and care of the canal and locks were included in the project
July 1, 1935, under the provisions of the Permanent Appropriations
Repeal Act approved June 26, 1934. The last-mentioned document
contains the latest published map.
   Local cooperation.-Fully complied with.
    Terminal facilities.-The Crown Willamette Paper Co. has con-
structed a timber wharf about 850 feet in length, extending to and
supported by the concrete division wall built in the lock canal by the
United States. This wharf is used mainly for the shipment of their
products and receipt of material and supplies.
    Operations and results during fiscal year.-Repairs to and general
policing and care of the property resulted in continuous service dur-
ing the year. The costs for the year were $37,142.29 for operating
and care. Expenditures for the year were $39,128.24.
    Condition at end of fiscal year.-The final report on the project
for purchase and rehabilitation of the canal and locks was given in
the Annual Report for 1923, when the project was reported 98 percent
complete. No further work is considered necessary. The depth over
the miter sills is 6 feet at low water. The locks and grounds are in
fair condition and are continuously serviceable, except when high
water or necessary repairs prevent.
    Expenditures for purchase and rehabilitation of the locks and canal
were $677,122.20, of which $300,000 was from contributed funds.
  x A guard lock 210 by 40 feet, which is used only at higher stages of water, is located at
the upper end of the canal basin.
  2A concrete division wall, 1,227 feet long, extending from lock no. 4 to the guard
lock, separates   the upper basin of the canal   from the head race, which formerly led
directly from the basin and supplied water for the power plants operated by the Crown
Willamette Paper Co. and the Portland Railway, Light & Power Co.
   3 The dam is owned by private parties.
RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                                        1507
Costs for operating and care were $70,871.56. Expenditures were
$71,237.14.
  In addition the sum of $452,109.76 was expended between April 26,
1915, and June 30, 1935, on the operation and care of the works of
improvement under the provision of the permanent indefinite appro-
priation for such purposes.
    Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year, together with an allotment of $36,000
made on July 21, 1937, will be applied as follows:
Accounts payable-------------------------------------------$906.64
Maintenance :
    Operation of locks     ------------------------------------- 25, 851. 87
    Ordinary maintenance and repair--------------------------7,      700. 00
    Improvement and reconstruction---------------------------     2, 300. 00
    Channel work-----      -------------------------------------   , 700. 00
    Emergencies     --- ---------------------------------------   1, 300. 00
           Total-------------                                      ---------------------------------                                  39, 848. 51
  The sum of $37,000 can be profitably expended during the fiscal
year 1939, as follows:
Maintenance :
    Operation of locks----      ----------------------------------- $24, 000
    Ordinary maintenance and repair-----------------                  _
                                                                  ------    7, 700
   Improvement and reconstruction             ----------------------------- 2, 300
   Channel work --------------------------------------------                1, 700
   Emergencies      ----------------------------------------------          1, 300
             Total              ------------------------------------------------                                                         37, 000

                                                      Cost and financial summary

Cost of new work to June 30, 1937--------------------------                                                                      $377, 122. 20
Cost of maintenance to June 30, 1937---------------------------                                                                  2 522, 981. 32

      Total cost of permanent work to June 30, 1937              900, 103. 52                           -------------
Undistributed costs June 30, 1937-------------------------------      832. 72
      Net total cost to June 30, 1937-------------------------900, 936. 24
Plus accounts receivable June 30, 1937---------------------------   85. 65
     Gross total costs to June 30, 1937-----------------------901, 021. 89
Minus accounts payable June 30, 1937----------------------------   552. 79
     Net total expenditures    ----------------------------                                                                   12 900, 469. 10
Unexpended balance June 30, 1937-   ---------   -------------                                                                          3, 762. 86
           Total amount appropriated to June 30, 1937---------------                                                          12904,     231. 96

           Fiscalyear ending June 30                                       1933             1934           1935           1936            1937


Cost of new work........$7,-0--------
Cost of maintenance   -------------------                             $27, 405. 92       $28, 080. 99   $34, 214.94    $34, 823. 01     $37, 142. 29
Total expended-------.....             ----------------                 27, 907. 86       28, 267. 92    32, 256. 20    35, 503. 39      39, 128. 24
Allotted     ................-------                                       32, 671. 94
                                        ...............----------------------             21, 191. 12    72, 000.00     32, 242. 40       3, 000. 00


   1 In addition, $300,000 was expended from contributed funds.
    SIncludes         $452,109.76 costs and expenditures from permanent indefinite appropriation.
1508      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936----------             -------           $39, 891. 10
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936____--     -------------------------                     3,000.00
      Amount to be accounted for-------------------------------          42, 891. 10
Gross amount expended --          ___-------_----     $43, 049.02
Less reimbursements collected----___------          _---- 3, 920. 78
                                                                         39, 128. 24
      Balance unexpended June 30, 1937_ ________------__-              -3,     762. 86
Outstanding liabilities June 30, 1937----------------------------              996. 64
      Balance available June 30, 1937__________________------_               2, 766. 22
Accounts receivable June 30, 1937_111111111                                      85. 65
     Unobligated balance available June 30, 1937_____
                                                    -------                  2, 851. 87
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937__________________-____-_-----                    36, 000.00
     Balance available for fiscal year 1938_______________--_-           38, 851. 87
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 3___________--_____-__--                      37, 000.00
  sExclusive of available   funds.

                               17. LAKE RIVER, WASH.

   Location.-This river, located in Clark County, Wash., is the out-
let of Vancouver Lake, located about 2 miles northwest of Van-
couver, Wash. The stream flows in a northerly direction for about
11 miles and empties into the Columbia River about 88 miles above
the mouth. (See map of Columbia National Forest, U. S. Forest
Service, 1935, and U. S. Coast and Geodetic Survey Chart No. 6154.)
   Existing project.-This provides for a channel 6 feet deep at low
water and 100 feet wide from the mouth of the river to Ridgefield
 (3 miles). The mean tidal range between mean lower low and mean
higher high waters at the mouth of the river is 3 feet.
   The estimated cost of new work, made in 1930, was $3,000. The
latest (1932) approved estimate for annual cost of maintenance is
$2,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930, in accordance with House Committee Document No. 2,
Sixty-ninth Congress, first session, as modified by the report of the
War Department dated May 10, 1930, pursuant to the Commerce
Committee resolution of February 22, 1930.
   Terminal facilities.-There are four timber wharves on Lake River.
These are at Ridgefield, 21/2 miles above the mouth of the river.
Two of these wharves are open to the public and two are privately
owned. The principal traffic is floated logs, which are placed in the
river from a log dump connected with the railway at Felida. The
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1931. The controlling depth from the mouth of the river to Ridge-
field is 6.5 feet at low water. The project width of 100 feet from
the mouth to Ridgefield now obtains. The total cost of the existing
project to the end of the fiscal year was $6,700, of which $2,700 was
for new work and $4,000 for maintenance. The total expenditure
was $6,700.
   Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
 RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                           1509
  The sum of $2,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging between Ridgefield and the
mouth of the river, by contract, August and September 1938.
                                 Cost and financial summary
Cost of new work to June 30, 1937_        -------------------                               $2, 700
Cost of maintenance to June 30, 1937----------------------------                             4, 000

      Total cost of permanent work to June 30, 1937----                                       6, 700
Net total expenditures__------------------------------- ---------------                        , 700
Total amount appropriated to June 30, 1937---------------------------                         6, 700

        Fiscal year ending June 30             1933       1934       1935        1936        1937


Cost of new work-------------------     ------------             ----------------------------------
Cost of maintenance..------------------     -------              -----------------------------------
Total expended---------              --------------------------------------------------------
Allotted----------------------------------------$2,000              -$2,000


Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance _________     ----------------                 $2, 000

                                 18. LEWIS RIVER, WASH.

   Location.This river rises in the Cascade Range in Washington,
flows westerly and southwesterly 110 miles, and empties into the Co-
lumbia River about 88 miles from the mouth. (See U. S. Coast and
Geodetic Survey Charts Nos. 6153 and 6154.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1899, and modified by the River and
Harbor Act of June 13, 1902. The cost and expenditures were $30,-
350, of which $22,251.62 was for new work and $8,098.38 for mainte-
nance. For further details of previous projects see page 2001, Annual
Report for 1915.
   Existing project.-This provides for a low-water channel 6 feet
deep and 50 feet wide to the mouth of the East Fork (33/4 miles); 4
feet deep and 50 feet wide on the East Fork from its mouth to La
Center (3 miles) ; 4 feet deep and 50 feet wide on Lewis River (North
Fork) from the East Fork to Woodland (31/2 miles), to be secured
by dredging and by the construction of regulating works, and for
clearing the channel to Aerial (16 miles above Woodland). The max-
imum variation of water level due to tides ranges from about 3 feet
at the mouth to 1    feet at La Center and zero at Woodland. During
ordinary freshets a stage of 14 feet and, at extreme floods, a stage
of about 24 feet is reached in the main river at Woodland, Wash.
   The estimate of cost for new work made in 1913 was $61,500, ex-
clusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913 (H. Doc. No. 28, 62d Cong., 1st sess.). For latest pub-
lished map see page 3557 of Annual Report for 1904.
   Recommended modifications of project.-The Chief of Engineers
has recommended that the project be modified by eliminating all work
on the East Fork and on the North Fork above Woodland (H. Doc.
No. 467, 69th Cong., 1st sess.).
1510              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.-At La Center, on the East Fork, and at Wood-
land, on the North Fork, respectively, the terminals, pile and timber
structures, are publicly owned and are considered adequate for the
existing commerce.
   Operations and results during fiscal year.-The only operations
were on hydrographic surveys. The total cost and expenditures were
$502.06, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1927. The work done has extended low-water navigation
to Woodland and La Center, to which points the controlling depths
are about 2 feet and 1 foot, respectively. The channel has deterio-
rated badly, due to the fact that no maintenance work has been done
since 1922. Traffic is light and consists of rafted logs and piling and
occasional pleasure launches. The total cost and expenditures were
$103,215.76, of which $35,880.44 was for new work and $67,335.32 for
maintenance.
  Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
   The sum of $2,000 can be profitably expended during the fiscal year
1939 for maintenance, snag removal, and surveys between Woodland
and La Center and the mouth of the river, by Government plant and
hired labor.
                                              Cost and financial summary

Cost of new work to June 30, 1937_______________________________ $58, 132. 06
Cost of maintenance to June 30, 1937---------     _________--__75, 433. 70

              Total cost of permanent work to June 30, 1937___________ 133, 565. 76

Net total expenditures_____---------------------__               133, 565. 76
Unexpended balance June 30, 1937--------------------------------149.       00

              Total amount appropriated to June 30, 1937_________________                                        133, 714. 76

              Fiscal year ending June 30                        1933         1934          1935          1936         1937


Cost of new work .....----------
Cost of maintenance-----------------...................--... -------..-    $1, 000. 00   $4, 071. 57   $3, 317. 55       $502. 06
Total expended.......---------------------------------                      1, 000. 00    4, 071. 57    3, 317. 55           502. 06
Allotted...     ----------------------------                 $1, 000. 00   1,11,000.00         ......
                                                                                         11,0000..-------------3,959.,82



Balance unexpended July 1, 1936_____________________--___--        $4, 610. 88
Deductions on account of revocation of allotment__________________ 3, 959. 82

      Net amount to be accounted for_________________-                                                 ____-_          651.06
Gross amount expended_____________________                                                                             502. 06

              Balance unexpended June 30, 1937-------------------------                                                149. 00

Amount that can be profitably    expended
                                   - - -- - in fiscal year ending June
30, 1939, for maintenance - - - -____________________                                                               2,000.00
    1 Exclusive of available funds.

                                           19. COWLITZ RIVER, WASH.

   Location.-This river rises in the Cascade Range in Washington,
flows westerly and southerly about 120 miles, and empties into the
  RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                     1511
Columbia River about 69 miles from the mouth. (See U. S. Coast
and Geodetic Survey Chart No. 6153.)
    Previous projects.-Adopted by the River and Harbor Act of June
14, 1880. Both the cost and expenditures were $53,182.93, of which
$4,999 was for new work and $48,183.93 for maintenance. For fur-
ther details see page 2000 of Annual Report for 1915.
    Existing project.-This provides for a channel 4 feet deep at low
water and 50 feet wide from the mouth to Ostrander (9 miles),
thence 21/2 feet deep and 50 feet wide to Castle Rock (10 miles),
and thence 21/2 feet deep at low water and not less than 40 feet wide
to Toledo (18 miles), to be secured by snagging, dredging, and regu-
lating works. The water level, due to tides, varies from 4 feet at the
mouth to zero at Ostrander. During ordinary freshets a stage of
20 feet, and at extreme floods a stage of 25 feet, is reached in the
river at Kelso, Wash.
    The estimate of cost for new work, revised in 1912, was $39,100,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $2,000.
    The existing project was adopted by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 1167, 60th Cong., 2d sess., from the
mouth to Castle Rock, and H. Doc. No. 404, 61st Cong., 2d sess., from
Castle Rock to Toledo). For the latest published map see House
Document No. 1167, Sixtieth Congress, second session.
    Recommended modifications of project.-The Chief of Engineers
has recommended that the project be modified by the elimination of
all work above Castle Rock (H. Doc. No. 467, 69th Cong., 1st sess.).
    Terminal facilities.-Above Kelso the terminal facilities are lim-
ited to two log dumps. At Kelso there are a number of small private
wharves and one public landing. Between Kelso and the mouth
there are two private commercial wharves. These facilities are
considered adequate for present commerce.
    Operations and results during fiscal year.-Maintenance dredging
above Kelso was done by U. S. dredge Monticello during September
1936. A total of 15,122 cubic yards was removed at a cost of
$2,529.15. In addition, hydrographic surveys were made. The total
cost was $3,193.18. Expenditures were $3,278.18.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1913 at a saving of $6,192 under the estimated cost. The
project depth and width between the mouth and Ostrander are avail-
able. The total cost of the existing project was $194,541.42, of which
$32,907.62 was for new work and $161,633.80 for maintenance. The
total expenditure was $194,541.42.
    Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
    The sum of $8,000 can be profitably expended during the fiscal
year 1939 for maintenance as follows:
Dredging between Ostrander and mouth of the river by Government
  plant and hired labor, August to December 1938-______ ________--      $4, 500
Snag removal and surveys between Ostrander and mouth of the river, by
  Government plant and hired labor, during fiscal year 1939_ ---_______ 3, 500
      Total                  -------------------------------             8,000
1512              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                Cost and financial summary
Cost of new work to June 30, 1937-_ ---------------           $37,906. 62
Cost of maintenance to June 30, 1937------------------------209,817. 73

      Total cost of permanent work to June 30, 1937------------247, 724. 35
Net total expenditures--_---------------------------------- 247, 724.35
                                          ----------------
Total amount appropriated to June 30, 1937__                    247, 724.35

            Fiscal year ending June 30                           1933          1934          1935          1936            1937


                                ---
Cost of new work _---------..........    -           ----------------------------------
Cost of maintenance__
                    -- -----------------   $1, 381. 91 $31, 259. 40 $12, 600. 92 $7, 402. 56                              $3,193.18

Total expended........................-----------------------   1, 748. 78   31, 180. 03   12, 599. 79    7, 317. 56       3, 278. 18

Allotted_.      -----------------------------
                   .                                            4,970. 83    37, 903. 52   10,000. 00--



Balance unexpended July 1, 1936-__--------------------------                                                           $3, 278. 18
Gross amount expended------------------------------------                                                               3,278. 18

Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance-------------------------------------                                                             8, 000. 00

                                         20. ELOKOMIN SLOUGH, WASH.

   Location.-This slough is a side channel of the Columbia River,
about 31/2 miles in length, located on the Washington side about 75
miles below Portland, Oreg. (See U. S. Coast and Geodetic Survey
Chart No. 6152.)
   Existing project.-This provides for a channel 10 feet deep and
100 feet wide extending from that depth in Columbia River near the
easterly end of the slough to the existing terminals near the. mouth of
Elokomin River, a distance of about 11/2 miles, with suitable turning
basin of the same depth at the inner end. Low water is the plane of
reference. The average tidal range during low water conditions in
the Columbia River is about 5 feet.
   The estimated cost for new work made in 1937, is $16,000. The
latest (1937) approved estimate of cost of annual maintenance is
$5,000.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 510, 74th Cong., 2d sess.). The
latest published map is in this document.
   Local cooperation.-The condition of local cooperation, requiring
local interests to provide necessary rights-of-way and suitable spoil-
disposal areas for new work and subsequent maintenance remain to
be complied with.
   Terminal facilities.-The only terminals are the privately owned
wharves of Crown Willamette Paper Co. and International Wood
Products Co. There is no present need for additional terminals.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project. A survey made in December 1935 shows a controlling depth
of 5 feet in the proposed channel.
   Proposed operations.-No funds are available, and no work is con-
templated during the fiscal year 1938.
  RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                      1513
  The sum of $16,000 can be profitably expended during the fiscal
year 1939 in execution of the project, by contract, September to
December 1938.
                          Cost and financial summary
Total amount appropriated to June 30, 1937-----------  ----------------
Amount (estimated) required to be appropriated for completion of
   existing project------------------------------------------$16,000
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for new work------------___---------------       ---        16, 000

                     21. SKAMOKAWA CREEK, WASH.

   Location.-This creek rises in Wahkiakum County, in the south-
western part of the State of Washington, flows southwesterly and
southerly about 10 miles, and empties into the Columbia River about
34 miles from the mouth. (See U. S. Coast and Geodetic Survey
Chart No. 6152.)
   Existing project.-This provides for a channel 61/2 feet deep at low
water and 75 feet wide between Steamboat and Brooks Sloughs, about
1,600 feet. The tidal range between mean lower low water and mean
higher high water is about 7 feet and the maximum variation of
water level due to tides or freshets is about 12 feet. During ordinary
freshets a stage of 9 feet and at extreme floods a stage of 12 feet is
reached in. the creek at Skamokawa, Wash.
   The estimate of cost for new work, made in 1919, was $2,400. The
latest (1925) approved estimate for annual cost of maintenance is
$2,000.
   The existing project was authorized by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 111, 63d Cong., 1st sess.). The latest
published map is in the project document.
   Terminal facilities.-There are three privately owned wharves, one
on Steamboat Slough and two above Brooks Slough, used for general
freight and passenger purposes, and these are considered adequate
for the present commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in 1920.
The controlling depth is 7 feet at lower low water. The total cost
of the existing project was $24,837.11, of which $2,400 was for new
work and $22,437.11 for maintenance. The total expenditures were
$24,837.11.
   Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
   The sum of $2,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging between Brooks Slough and
Steamboat Slough, by contract, January and February 1939.
                         Cost and financial summary

Cost of new work to June 30, 1937---------------------------         $2, 400. 00
Cost of maintenance to June 30, 1937--------- -----------------      22, 437. 11
      Total cost of permanent work to June 30, 1937------------- 24, 837. 11
Net total expenditures-----      ------------------------------ 24, 837.11
Total amount appropriated to June 30, 1937-------------              24, 837. 11
1514         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


        Fiscal year ending June 30             1933          1934            1935             1936          1937


Cost of new work _.    ------------                                                             --
Cost of maintenance   .------------------- $1, 582. 51     $4, 855. 09   -__-_-     -    $1, 974. 34 .       -
Total expended--_-----------------------      1, 582.51     4, 269.08        $411. 18      1, 974. 34    ________

Allotted- ---.--           ---------------    3, 575. 56    2, 687. 21      2, 000. 00 ___------------      -$25. 66


Balance unexpended July 1, 1936___--  ____-----_______________----------------__--      $25. 66
Deductions on account of revocation of allotment______      ______-                      25. 66
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for maintenance___ ______-______        _____-_____-                       - 2, 000. 00

                                      22. GRAYS RIVER, WASH.

   Location.-This river rises in the Coast Range in Washington,
flows southwesterly about 30 miles, and empties into Grays Bay in
the estuary of the Columbia River, about 21 miles above the mouth.
(See U. S. Coast and Geodetic Survey Chart No. 6151.)
   Existing project.-This provides for the removal of snags and
other obstructions from the channel and overhanging trees from
the banks between the mouth and the town of Grays River, 8 miles
above. The tidal range at the mouth between mean lower low water
and mean higher high water is about 8 feet, and the extreme range
is about 13 feet.
   The estimate of cost for new work, made in 1907, was $2,500. The
latest (1918) approved estimate for annual cost of maintenance is
$500. The existing project was adopted by the River and Harbor
Act of March 2, 1907 (Rivers and Harbors Committee Doc. No. 1,
59th Cong., 2d sess.). There is no published map.
   Terminal facilities.-The terminals are small wharves, privately
owned, and are considered adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1909. The river is in fairly good condition, but shoal. For
about 61/ miles above the mouth the controlling depth is 2 feet, and
above that, to town of Grays River, 1/2 miles farther up, it is prac-
tically dry in two places at low-water stage. The river is used for
logs only above the town of Grays River. The total cost and amount
expended under the existing project is $7,302.29, of which $2,500 was
for new work and $4,802.29 for maintenance.
   Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
   The sum of $1,000 can be profitably expended during the fiscal
year 1939 for maintenance snagging between the town of Grays
River and the mouth of the river, by Government plant and hired
labor, July 1938.
                                      Cost and financial summary
Cost of new work to June 30, 1937 _________________________________                                     $2, 500. 00
Cost of maintenance to June 30, 1937 ______________________________                                      4, 802. 29
      Total cost of permanent work to June 30, 1937--_                                                  7, 302. 29
Net total expenditures--------------                                                                 __7, 302. 29
Total amount appropriated to June 30, 1937 ---                               -            -          _ 7, 302. 29
    RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                         1515

          Fiscal year ending June 30                1933         1934            1935           1936           1937


Cost of new work-----     -----        -----------------------------------------       ---------
Cost of maintenance-------------------- ------------ -----------     $500     $794. 30

Total expended.....------....-----........----------------------- ------------          500      794. 30---------
Allotted----..........     .----------.-..--.----                       500             ----..-----
                                                                                   1, 000                     -$205.70


Balance unexpended July 1, 1936------------------------------ ----                                          $205. 70
Deductions on account of revocation of allotment------------------                                            205. 70
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance--------------------------------------1, 000. 00

                                        23. DEEP RIVER, WASH.

    Location.-This river is mainly a tidal slough of Grays Bay, Wash.,
an estuary on the north side of the Columbia River, about 20 miles
from the mouth. The slough extends northerly about 4 miles from
the northern end of Grays Bay, and the section above the head of the
slough has several small tributaries. (See U. S. Coast and Geodetic
Survey Chart No. 6151.)
    Existing project.-This provides for a channel 8 feet deep at mean
lower low water, 100 feet wide through the bars at the mouth of the
river and the entrance thereto, and 60 feet wide in the river up to
the town of Deep River. The tidal range at the mouth, between mean
lower low water and mean higher high water, is about 8 feet and
the extreme range about 13 feet. During ordinary freshets a stage
of 9 feet, and at extreme floods a stage of 14 feet is reached in the
river at the town of Deep River, Wash.
    The estimate of cost for new work, revised in 1927, was $18,200.
The latest (1923) approved estimate of annual cost of maintenance
is $2,400.
    The existing project was adopted by the River and Harbor Act of
March 3, 1925 (H. Doc. No. 218, 68th Cong., 1st sess.). There is no
published map.
    Terminal facilities.-There is one privately owned wharf at the
town of Deep River for general freight and passenger purposes which
is considered adequate for the present commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in 1928,
at a saving of $2,815 under the estimated cost. There is now a chan-
nel with a least width of 100 feet and 7 feet deep at mean lower low
water, between deep water in the Columbia River and the mouth of
Deep River, and thence 71/2 feet deep and 60 feet wide to the town of
Deep River. The total cost was $27,394.41, of which $15,384.40 was
for new work and $12,010.01 for maintenance. The total expendi-
tures were $27,394.41.
   Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1938.
   The sum of $2,400 can be profitably expended during the fiscal
year 1939 for maintenance dredging between the town of Deep River
and the mouth of the river, by contract, July and August 1938.
1516         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                     Cost and financial summary
Cost of new work to June 30, 1937_________ ___-__-       _______ $15, 384. 40
Cost of maintenance to June 30, 1937---------------------------12,    010. 01
      Total cost of permanent work to June 30, 1937                                                                  27, 394. 41
Net total expenditures----    ____-____________                                                                      27, 394. 41
Total amount appropriated to June 30, 1937------______________                                                       27, 394.41

        Fiscal year ending June 30                           1933       1934             1935              1936               1937

Cost of new work ... ....--
                     - -
Cost of maintenance_-__
                                ..-.-
                      .......---.-
                                        -
                                            -
                                                .-.       -    -. .
                                                      --- $1, 387. 18   $335. 93
                                                                                     -      ..
                                                                                            -
                                                                                   -----------....
                                                                                                           -
                                                                                                           $664.34     .
                                                                                                                            . ......
                                                                                                                           .-

Total expended.....-----------------------                 4,617.51      301.87------------                664. 34..
Allotted--.----------------------------                      783. 78     249. 61         -$3. 32   -_---               -$1, 735. 66


Balance unexpended July 1, 1936------------------------------$1,                                                             735. 66
Deductions on account of revocation of allotment                                            -                          1, 735. 66
Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance__ ________-__--____-_-            _______--                                                     2, 400.00

                   24. COLUMBIA RIVER AT BAKERS BAY, WASH.

   Location.-Bakers (Baker) Bay is a shallow body of water about
15 square miles in extent lying on the north side of the Columbia
River near its mouth. The bay is separated from the river by Sand
Island, a low-lying sand bar only a few feet above high-tide level.
(See U. S. Coast and Geodetic Survey Chart No. 6151.)
   Existing project.-This provides for a channel 10 feet deep and 200
feet wide extending through the easterly passage at Sand Island to
the port of Ilwaco, a distance of about 5 miles. Mean lower low water
is the plane of reference. The tidal range between mean lower low
water and mean higher high water is about 8 feet, and the extreme
tidal range about 13 feet.
   The estimated cost for new work, revised in 1934, was $80,000. The
latest (1935) approved estimate for annual cost of maintenance is
$6.000.
   The existing project was authorized by the Public Works Admin-
istration, December 11, 1933, and the River and Harbor Act of August
30, 1935 (H. Doc. No. 44, 73d Cong., 1st sess.). The latest published
map is contained in the project document.
   Terminal facilities.-Terminals have been constructed at Ilwaco
along Holman Waterway, 200 feet wide by 3,000 feet in length and
on a dredged basin 400 by 1,000 feet. The facilities consist of
wharves, floats, ramps, and berths for oil barges and oil boats. The
facilities are considered adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in July 1934. The controlling depth is now 10 feet at mean
lower low water, except in Holman Waterway at Ilwaco, where the
depth is 5 feet. The total cost and expenditures were $78,577.47, all
for new work, from Public Works funds.
   RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                                  1517
   Proposed operation.-No funds are available and no work is con-
templated for the fiscal year 1938.
   The sum of $12,000 can be profitably expended during the fiscal year
1.939 for maintenance dredging, by contract, August and September,
1938.
                                            Cost and financial summary
Cost of new work to June 30, 1937__ -----------------------                                                                     $78, 577. 47
Cost of maintenance to June 30, 1937_-                                                                                          --
         Total cost of permanent work to June 30, 1937___-------                                                         -       78, 577. 47

Net total expenditures__--      _-------   ___                                                                                   78, 577.47
Total amount appropriated to June 30, 1937----------------                                                                       78, 577. 47

         Fiscal year ending June 30                              1933                 1934           1935              1936            1937

                      __
                       ---__---.-
Cost of new work--....--                              -------               -$59,      816. 82    $18, 760. 65      ......-------............
Cost of maintenance           _ _                         __ ______            __----                            ------------     -----------
Total expended                .------
                            --------------..---....                                 29, 978. 40    48, 599. 07 .....          ......... ......
Allotted --------.---------..-.-.-.....                    .--          -           80, 000.00    -1, 422. 53 ..


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance____    __   __________________--------_ $12, 00. 00

    25. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year was $167,110.32; the expenditures
were $168,169.87. The funds unexpended June 30, 1937, together
with an allotment of $25,000 made during July 1937, a total of $54,-
780.29, will be applied as needed during the fiscal year 1938 to pay-
ment of expenses to be incurred under this heading. The additional
sum of $50,000 can be profitably expended during the fiscal year 1939.
                                            Cost and financial summary

Cost of new work to June 30, 1937
                                            --
Cost of maintenance to June 30, 1937________--                                                ______---                       $572, 590. 05

      Total cost of permanent work to June 30, 1937 ------__---                                                              - 572, 590. 05
Minus accounts payable June 30, 1937____--     _____----____                                                                     2, 362. 70
     Net total expenditures----------------                                                                                     570, 227. 35
Unexpended balance June 30, 1937 --------------                                                   _________-_                    32, 837. 72
          Total amount appropriated to June 30, 1937_________                                                       __          603, 065. 07

         Fiscal year ending June 30                              1933                 1934           1935            1936              1937

Cost of new work- .-----
Cost of maintenance------------ ____$75,
                                     -                            459. 05       $31, 256. 75      $80, 501. 06    $52, 092. 80     $167, 110. 32
Total expended_-.                                           73, 619. 68
                                          ..----------------------              45, 062. 45        81,760. 72      50, 266. 44       168, 169. 87
Allotted............-------------------                   - 103, 657. 24            39, 980. 75    61,831. 91       5, 000. 00       147, 981. 72
1518             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 __________ __                  $53, 025. 87
Amount allotted from War Department Appropriation Act approved
   May 15, 1936---------------------------------------------- 147,981.72
       Amount to be accounted for---
                                 ....                _________      201,007. 59
Gross amount expended-----------------------------$170, 615.06
Less reimbursements collected-----------------------    2, 445. 19
                                                                    168, 169. 87

       Balance unexpended June 30, 1937 ------ __- __------------                                                                                32, 837. 72
Outstanding liabilities June 30, 1937 ___________-----                                                                                           3,057. 43
      Balance available June 30, 1937----------------------------29, 780. 29
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937--------------------_ ---------------------- 25, 000. 00

            Balance available for fiscal year 1938____________--------                                                                           54, 780. 29
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for maintenance 1---------------------------------------50, 000. 00
  SExclusive of available funds.

26. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                            [Commercial statistics for these projects are given in pt. 2 of report]

                                                                                             Cost and expenditures to
                                                                          For last                 June 30, 1937                                  Estimated
                         Name of project                                full report                                                               amount re-
                                                                         see annual                                                                   quired to
                                                                        report for-          New work                Maintenance                      complete


1. Siuslaw River, Oreg.1 ------------------------                            1931          2 $526, 588. 87                $42, 551. 43
2. Tillamook Bay and Bar, Oreg.'------------_-----                           1936           3 651, 655. 70              3 819, 765. 95
3. Nehalem Bay, Oreg.'_-_-_-_l  _ ________-__ -_                             1933            4302, 691.71                  11, 337. 32            .
4. Oregon Slough (North Portland Harbor), Oreg._                             1936             5 16, 881. 30               512, 576. 42                -
5. Skamokawa (Steamboat Slough), Wash.'1 .......                             1932         ............--------------............--------------             6 $8, 300

  1 Channel adequate for present commerce.
  2 In   addition    $322,531.59 was expended by local interests.
  3 In   addition    $405,282.70 was expended from contributed funds.
  4In    addition    $304,825.61 was expended from contributed funds.
  5 In   addition    $24,556.30 was expended from contributed funds.
  6   Local interests are to contribute two-thirds of cost, or not to exceed $20,000.

      27. PLANT ALLOTMENT FOR FIRST PORTLAND, OREG., DISTRICT

                                                 Cost and financial summary

Undistributed costs June 30, 1937---------------------------                                                                        $1, 231. 465.26
Plus accounts receivable June 30, 1937_________-_______-- ____                                                                           58, 332. 03
      Gross total costs to June 30, 1937------------------------1, 289, 797. 29
Minus accounts payable June 30, 1937-------------------------       67, 874. 71
     Net total expenditures_ ----------------------------
                              _                                                                                                       1, 221, 922. 58
Unexpended balance June 30, 1937---------------------------                                                                              124, 930. 25
           Total amount appropriated to June 30, 1937--------------1, 346, 852. 83

      Fiscal year ending June 30                   1933                 1934                   1935                       1936                            1937

Total expended               ................-      ....--------------.............    $1, 024, 475. 12             $208, 189. 87                -$10, 742. 41
Allotted--....      ...........--.--.....                         -..                 - 1, 316, 852. 83                 75, 000. 00               -45, 000. 00
 RIVERS AND HARBORS-FIRST                                PORTLAND, OREG., DISTRICT                                     1519
Balance unexpended July 1, 1936__---------
                                   .-----------                                                       $159, 187. 84
Deductions on account of revocation of allotment____----------                                          45, 000. 00

       Net amount to be accounted for---------------------------114,     187. 84
Gross amount expended-------- --------------- $1, 110, 906.43
Less :
    Reimbursements collected----- $1, 115, 163.70
    Receipts from sales                 6, 485. 14
                                        6----------
                                                    1, 121, 648. 84
                                                                    -10, 742. 41

      Balance unexpended June 30, 1937-                          ----------------                        124, 930. 25
Outstanding liabilities June 30, 1937                            ___------------107,                          874. 80

     Balance available June 30, 1937-----------------                                                        17, 055.45
Accounts receivable June 30, 1937- ---  ----------                                                           58, 332. 03

     Unobligated balance available June 30, 1937________-___                                                 75, 387. 48
Amount that can be profitably expended in fiscal year ending June
30, 1939, for plant betterment______________               __                                               95, 800. 00

                   28. COLUMBIA RIVER BASIN, FLOOD CONTROL

  Location.-The flood-control improvements included in this project
are located along the lower Columbia River between its mouth and
the tributary Sandy River, to the north and northwest of Portland
in Oregon and on the opposite side of the river in Washington.
  Existing project.-The Flood Control Act approved June 22, 1936,
authorized the construction of flood-control work in the Columbia
River Basin at the following localities:

                                                                                              Estimated
                                                                                              construc-          Revised
                                                                                               tion cost        construc-
                                                                                               in Flood
                                                                                                Control         tion cost
                                                                                                  Act
                                                                                                        --   i---
                                                                                                              ------


Cowlitz County,Wash., drainage and diking districts; raise and improve existing
levees to increase flood protection for the following listed projects for the pro-
tection of agricultural communities:
    Diking and improvement district no. 5_----                                                  $251, 500               154, 323
    Consolidated diking and improvement district no. 1, including protection for
       the town of Longview---                                                                   286, 200 --------
Wahkiakum County, Wash., drainage and diking districts; raise and improve
existing levees to increase flood protection for the following listed projects for the
protection of agricultural communities:
    Diking districts nos. 1 and 3________                ______                                  193, 000              1 212, 300
    Diking district no. 1 (Little Island)----__ _             --------------------                26,000                1 28, 600
    Diking and improvement district no. 4 --                                __                   150,200
Pacific County, Wash.; raise and improve existing levees to increase flood pro-
  tection for agricultural community; Pacific County diking district ...------.                   22, 700
Multnomah County, Oreg., drainage and diking districts; raise and improve
existing levees to increase flood protection for the following agricultural com-
  munities:
    Sandy drainage district ----                                                                  92, 000
    Multnomah drainage district no. 1                ______                                      547,400                       ..
    Peninsular drainage district no. 1            _________               __       _____         133, 300..........
    Peninsular drainage district no. 2_____                                                      287, 200..             ...
Columbia County, Oreg.. drainage and diking district; raise and improve
  existing levees to increase flood protection for the following listed projects for
  the protection of agricultural communities:
    Scappoose drainage district -.           __       ____ _ _ __...                             329, 400                      .-
    Rainier drainage district_...            ____                                                  25, 700
    Beaver drainage district-__-                                                                 216, 6G0               239,320
    McGruder drainage district_ --.                                                               33,200                 47,333
    Midland drainage district --              - -            __...____
                                                        --------                         ._       62, 600                68, 220
    Marshland drainage district_..........__                                                      60,100                 31,305
    Webb drainage district_----               -    ____                                           61,100                 70, 059
    Woodson drainage district-.........................                                           19,100                  9, 873
  1 Estimate may have to be increased to meet desire of local interests for more complete protection.
        20196--37-pt. 1--      96
1520              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                                                                                   Estimated
                                                                                                                                   construe-        Revised
                                                                                                                                    tion cost       onstru-
                                                                                                                                    in   Flood      tion cost
                                                                                                                                     Control
                                                                                                                                      Act


Clatsop County, Oreg., drainage and diking districts; raise and improve existing
levees to increase flood protection for the following listed projects for the protec-
tion of agricultural communities:
    Westport district--        ------        -----------------------------------------                            $27, 200         ------
    Tenasillahe Island-...----------               --------------------------------------                           54, 700            $81, 739
    Blind slough, miscellaneous dikes ___-____.____-_                                                               92, 200             86, 978
    Drainage district no. 1_--- ___                  -               -              -__________ __    ..------- 107, 900               131, 034
    Knappa area, miscellaneous dikes..                                                                               8, 200 ..--------------------------------------
    Karlson Island_         ----------------------------------------------------                                    35, 000 ..--
    John Day River dikes           ----------------------------------------------                                   27, 800           ---..........
    Walluski River dikes           -----------------------------------------------                                  68, 200          ------
    Youngs River dikes- ---                             ___-                                                      217,100
    Diking district no. 2 ..      ------------------------------------                                              39, 400             42, 410
    Diking district no. 3------------------------------------------------                                            4, 500               5, 372
    Diking district no. 5_- --------            ___-______---          -    -     -     -   -    - --          -12,     900             17, 021
    Lewis and Clark River dikes               -----------------------------------------                             88,000
    Warrenton diking district no. 1              ---------------------------------------                            23, 000             44, 734
    Warrenton diking district no. 2              ---------------------------------------                            41, 900             64, 037
    Warrenton diking district no. 3                   ----------------------------------                            14, 900             25, 864
Wahkiakum County, Wash., drainage and diking districts; levees to protect
  areas now subjected to inundation:
    Skamokawa Creek area.. ---------------------------------------------                                            99, 200
    Upper Grays River area                      .......---------------------------------------------                78,200
    Deep River area                    ----------------------------------------------                               46, 800
Multnomah County, Oreg., Sauvie Island (areas A and B); levees to protect
  areas now subject to inundation_               --------------------------------------                         1, 364, 900       --------
Columbia County, Oreg., drainage and diking districts; levees to protect areas
  now subject to inundation:
    Deer Island area-...--------.           ------ -----------------------------------                             281, 600
    Prescott area..........                                                                                             200                           -------
                                                                                                                    26----------------------------------------------,
    Westland area------            ---------------------------------------------                                  116, 600             137, 519

        Total              -----------------------------------------------------                                                     5,673,700--



  Local cooperation.-See page 6.
  Condition at end of fiscal year.-Work on some of the projects has
been partially completed with funds administered by the Works
Progress Administration.
  Proposed operations.-The funds allotted will be expended during
the fiscal year 1938 for flood-control works, by contract, and will be
applied as follows:

                                                                                                                      Regular      Relief funds       Total
                                                                                                                       funds


Drainage district no. 1, Clatsop County, Oreg.:
    Levee construction____-...                      --......
                                                    ........-    ____    .                ...........                   $55, 471         $24, 460       $79, 931
    Bank protection___..........................................                                                         29, 100          12, 831        41, 931
    Drainage works--......- ..----------------------                 ___-.                                                6, 365           2, 807         9, 172
        Total_           -----------------------------------------------                                                 90,936           40,098        131,034
Blind. Slough diking district, Clatsop County, Oreg.:
    Levee construction__-                      -
                               -________._______--    -
                                                     __     -.                                      -        --          54, 465          20, 684        75, 149
    Drainage works_. --------.       ______-
                                       --    -     ___.__.._                                                              8, 573           3, 256        11,829
        Total.................................................-----------------------------------------------            63, 038          23, 940        86, 978
Diking improvement district no. 5, Cowlitz County, Wash.:
    Levee construction___..-------------------------------------                                                         15, 549          10, 989        26, 538
    Bank protection      ___............_-....- ..................--...                                                  54, 793          38, 721        93, 514
    Drainage works   _______ _.-------
                    ------                                              -                                                20, 081          14, 190        34, 271

        Total        _                                                                            .-----------------------------------------------
                                                                                                                90, 423       63, 900        154, 323
Webb District Improvement Co., Columbia County, Oreg.:
   Levee construction__  .---------------      .-    -                                                                - 17, 657            8, 923        26, 580
     Bank protection_. - ----        ---------                              -- -            -22,                            026           11, 133        33, 159
     Drainage works-------.------
                           ............                                  __-____-_                      ..                6,856            3, 464        10, 320
        Total ................ ......................-...-.........                                               -      46, 539          23, 520        70, 059
   RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                                                  1521

                                                                                                                           Regular      Relief funds   Total
                                                                                                                            funds


Midland drainage district, Columbia County, Oreg.:
   Levee construction-      .---------------------------------                                                               $9, 408         $6, 323    $15, 731
   Bank protection---       -----------------------------------                                                              29, 290         19, 685     48, 975
   Drainage works--_--              -___ -     -_------------------__                                                          2, 102         1,412       3,514

       Total---------                 ---..-------------.-------------...                                                    40, 800         27, 420     68, 220

Beaver drainage district, Columbia County, Oreg.:
   Levee construction---.....     ..----------.......
                                                   __         _..-....                                                       69, 058         22, 040     91,098
   Bank protection- _      __.--         ----.
                                     ..-----------                                                                           79, 696         25, 435    105, 131
   Drainage works ..             __............     ..-------------
                                                              .......---......                                               32, 666         10,425      43,091

       Total        .____._________-------------
                                              .                 .          ..      .....             ......                     420
                                                                                                                             181,            57,900     239,320
Magruder drainage district, Columbia County, Oreg.:
   Levee construction ________--------.............._......               19, 172                                                             3, 439     22, 611
   Drainage works    _______    ...................... ....---------------20, 961                                                             3, 761     24,722
       Total...-------------------------------------------                                                                   40,133           7, 200     47,333
Marshland drainage district, Columbia County, Oreg.:
   Levee construction___           ......------------ ..................                     16, 197                                          4, 129     20, 326
   Bank protection__.       ..-----------------....                ..           _             3, 207                                             818      4, 025
   Drainage works--..  --...-- ...... .....                 ............--------------------- 5, 541                                          1, 413      6, 954
       Total     ...........--------------------------------------..--------............                                     24,945           6, 360     31,305
Woodson drainage district, Columbia County, Oreg.
   Levee construction____-----_------____......-----.....                                                                     2, 195            780       2, 975
   Drainage works-        ....  .....-------------------...........                                                           4,738           2,160       6,898
       Total ....---------- _...-----------                     ---------------------------                                   6, 933          2, 940      9,873

Westland District Improvement Co., Columbia County, Oreg.:
                                                              85, 968
   Levee construction__--__-------------............................... 32, 874                                                                         118, 842
                                                               13, 511
   Drainage works..___-- ..----------------...............................
                                                                         5,166                                                                           18,677
       Total ........................-----------------------------------------------                                         99, 479         38,040        519
                                                                                                                                                        137,
Diking district no. 2, Clatsop County, Oreg.:
   Levee construction         ----------------------------------                                                              10, 874         4, 411     15, 285
   Bank protection __. -        __.-.------------------ -___ ______                                                           19, 296         7, 829     27,125
       Total        _________.....................
                                           ...     .................                                                          30,170         12,240      42,410
Diking district no. 3, Clatsop County, Oreg.:
   Levee construction-....____.---------------------------                                                                     2, 313         1, 053      3, 366
   Drainage works--______              .-----------------------------                                                          1, 379            627      2,006
                 ----...-.--.
       Total--...--                           -----      ..-.       .      .......-.--..                           .           3, 692         1, 680      5,372
Diking district no. 5, Clatsop County, Oreg.:
   Levee construction--......     ---
                              -__.....__________
                                           ---            .      .                                                            11, 153         3, 651     14, 804
   Drainage  works_.__..__
           Draiige      -ork       _...__
                                ........
                        ------------------------------------------                                                             1, 668
                                                                                                                               1_____.
                                                                                                                               1,68              549
                                                                                                                                                 59       2 217
                                                                                                                                                          2,  1
                                                                            4, 200
       Total......................................................--------------------------------------
                                                                 12,821               17,021
City of Warrenton diking district no. 1, Clatsop County, Oreg.:
    Levee construction-....... --------------------------------                18, 211                                                        8, 645     26, 856
    Drainage works        _____-----        --        --        -- --......... 12, 123                                                        5, 755     17,878
       Total                     ................................-----------------------------------------------              30,334         14,400      44,734
City of Warrenton diking district no. 2, Clatsop County, Oreg.:
    Levee construction_  _____________-....        ____-- -       -------   --                                                47, 683         9, 034     56, 717
    Bank protection.----__----            -------------------- ____.____                                                       3,084             584      3, 668
    Drainage works__--      ___-------------             -      -     -   -                                            -       3, 070            582      3,652
                                                                 53, 837   10, 200    64,037
       Total.....................................................---------------------------------------

City of Warrenton diking district no. 3, Clatsop County, Oreg.:
    Levee construction_......___--------------------------__                                                                  18, 837         2, 080     20, 917
    Drainage works---___-.....--___..  . . ..           ..----------------                                                     3, 547         1,400       4,947
       Total                                                                          3, 480
                              ---------------.............................---------............................
                                                                          22,384                25,864
Tenasillahe Island, Clatsop County, Oreg.:
   Levee construction          --.......----------------------------                                                          50, 764        20, 216     70, 980
   Bank protection_------.... ...
                                --      ---------------
                                         ..                  --   ---------                                                    7, 695         3, 064     10, 759
             ------------------------
       Total.........................................................                                                         58, 459        23, 280     81, 739
1522            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                                                       Regular         Relief funds      Total
                                                                                                           funds


Diking districts nos. 1 and 3 (Puget Island), Wahkiakum County,
Wash.:
   Levee construction_.-              __.---------------------                  --           -             $137, 020      $28, 882       $165, 902
   Bank protection..............------------........-------.....................-------------------          38, 320        8, 078         46, 398

     Total-------.........................----------------------------------------                          175, 340       36, 960        212, 300
Little Island diking district no. 1, Wahkiakum County, Wash.:
   Levee construction...........---------------------------------------                                      20, 093        4, 250         24, 343
   Bank protection----------------------------------........................................._....            3, 197        1, 150          4, 257
     Total----....................----.........-------------------------------------..............           23, 200        5, 400         28, 600
     Grand total---                    -------------------------- -----------                          1, 094, 883        403, 158      1, 498, 041



  The additional sum of $1,984,000 can be profitably expended dur-
ing the fiscal year 1939 for flood-control works, by contract, to be
applied as follows:
Cowlitz County, Wash.: Consolidated diking and improvement dis-
  trict no. 1, including protection for the town of Longview--------                                                                  $186, 600
Wahkiakum County, Wash.:
     Diking districts nos. 1 and 3, and diking district no. 1 (Little
         Island) ___-_-------------                                    _______
                                                                             -                        --                               202,900
     Diking and improvement district no. 4___                       _____--           200
                                                                                 1________                                             150,
Pacific County, Wash.: Pacific County diking district no. 1--------               22, 700
Multnomah County, Oreg.:
     Multnonah drainage district no. 1----------------------------               274, 000
     Peninsular drainage district no. 2----------------------                -   275, 500
Columbia County, Oreg.:
     Scappoose drainage district- ------------------------                  __-- 165, 0004
     Rainier drainage district_______________
                                  ---------                 -25,                      700
Clatsop County, Oreg.:
     Knappa area, miscellaneous dikes_---.............             __       __-    8, 200
    Karlson Island----------------------------------------------                  35, 000
Wahkiakum County, Wash.: Upper Grays River area ____________-78, 200
Multnomah County, Oreg.: Sauvie Island (areas A and B)____                       500, 000
Site investigations and detail plans for future work _______________-60, 000

                                                                                                                                     1, 984, 000
                                                Cost and financial summary
Total amount appropriated to June 30, 1937__
Amount (estimated) required to be appropriated for completion of
existing project---------------------------------------------    $4, 380, 000
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for new work----------------_             __    _ 1, 984, 000
1 Exclusive of available funds.

                 29. WILLAMETTE RIVER BASIN, FLOOD CONTROL
  Location.--The flood-control improvements included in this project
are located in the Willamette Basin of northwestern Oregon, as fol-
lows: On the Willamette River, on both banks, 18 to 175 miles above
Portland; along the entire length of the Tualatin River; on Muddy
Creek and Marys River near Corvallis; on both banks of McKenzie
River, 10 to 20 miles east of Eugene; on the Santiam River for about
30 miles above its mouth; on the Molalla River for about 30 miles
above its mouth; and on the Clackamas River for about 24 miles
above its mouth.
  Existing project.-Flood-control work in the Willamette River
Basin was adopted by Congress in the following item contained in
the Flood Control Act approved June 22, 1936:
     RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                               1523
   Construction of bank-protection works, with channel clearing on the Willam-
ette River, Clackamas River, Tualatin River, Molalla River, Santiam River,
Marys River, Muddy Creek, and on McKenzie River in Oregon, for the reduc-
tion of flood heights and to prevent loss of land by erosion; special report in
Office of the Chief of Engineers; estimated construction cost, $2,430,000.*
  Local cooperation.-See page 6.
  Condition at end of fiscal year.-Work has not been started.
  Proposed operations.-The funds allotted will be expended during
the fiscal year 1938 for flood-control works, by contract, and will be
applied as follows:

                                                                                Regular        Relief               Total
                                                                                 funds         funds

Weston Bend, mile 59.2 to 60.8, Willamette River, Oreg.: Bank pro-
  tection _   -      -_---- - - - - - - - - - - - - - - - - - -                  $111,209       $40,500               $151,709
Ditmar Bend, mile 68.4 to 69.0, Willamette River, Oreg.: Bank pro-
  tection - - ... -- - - - - - -.-- - - - - - - -              -                  143, 401        50,160                193,561
Eola Bend, mile 88.9 to 89.6, Willamette River, Oreg.: Bank pro-
  tection .                                                ---                     38, 650          080
                                                                                                  16,                    54,730
Marys and Muddy Rivers, Benton County, Oreg.: Channel and
bank cleaning and clearing----------------------------------                      25,160        51, 840                 77, 000
Clackamas River, Clackamas County, Oreg.: Bank protection_ .....                   22, 400       21, 600                 44, 000
Molalla River, Clackamas County, Oreg.: Bank protection   ..---------             179, 240       95, 760                275, 000

                                                                                  520, 060      275, 940               796, 000
Surveys...                                                                                     ..... ...-----------------------------------------------
                                                                                                                          8,768

         Total_      ------------------------------------------- ------------------------                              804,768


  The sum of $795,000 can be profitably expended during the fiscal
year 1939 for flood-control works, by contract, to be applied as follows:
Willamette River, bank protection--------------------------------      $375, 000
Tualatin River, bank protection-------------------------------------    300, 000
.McKenzie River, bank protection        ---------------------------       80, 000
Site investigations and detail plans for future work------------------   40, 000
             Total               --------------------------------                                                 795, 000

                                       Cost and financial summary
Total amount appropriated to June 30, 1937-----------------------                                          --------
Amount (estimated) required to be appropriated for completion of
                     - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - -
  existing project 1                                   _                                                  $1, 980, 000
Amount that can be profitably expended in fiscal year ending June 30,
    1939, for new work 1_-----------------                                                                        795, 000
    1 Exclusive of available funds.

                  30. LEWIS RIVER BASIN, WASH., FLOOD CONTROL
             COWLITZ GOUNTY DIKING IMPROVEMENT DISTRICT NO.                           11, WASHINGTON

   Location.-The works covered by this project are on the west bank
of Lewis River, at Woodland, Wash.
   Existing project.-This provides for the rehabilitation of existing
levees, drainage facilities, bank protection, and road surfacing at a
total estimated cost of $208,000. (Revised (1937) construction cost,
$214,775.) The existing project was authorized by the Flood Con-
trol Act of June 22, 1936, for the purpose of draining and protecting
from floodwaters an affected area of 1,740 acres.
   Local cooperation.-See page 6.
  * Estimate may have to be increased to meet desires of local interests for more complete
protection.
1524             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Condition at end of fiscal year.-The existing project has been par-
tially completed with funds administered by the Works Progress
Administration.
   Proposed operations.-The funds allotted will be expended during
the fiscal year 1938 for flood-control works, by contract, and will be
applied as follows:

                                                                                                         Regular      Relief      Total
                                                                                                          funds       funds

Diking improvement district no. 11, Cowlitz County, Wash.:
    Levee construction---....            -----------------------------------   $12, 076                                 $6, 624    $18, 700
    Bank protection-.....----------------------------                        - 123, 067                                 67, 508    190, 575
    Drainage works...------------------------------------------                  3, 552                                  1, 948      5, 500

      Total                   -----------------...............................------------------------------
                                                                                                         1 138, 695     76, 080    214,775


  No funds can be profitably expended during the fiscal year 1939
since the funds on hand will complete all work on the project.
                     31.       COWLITZ                  RIVER               BASIN,              FLOOD        CONTROL

   Location.-The flood-control improvements included in this proj-
ect are located near the mouth of the Cowlitz River on its east bank
at Kelso, Wash.
   Existing project.-Flood-controlwork in the Cowlitz River Basin
was adopted by Congress in the following item contained in the
flood-control act approved June 22, 1936:
  Improvement of existing works for additional protection of agricultural
communities in Cowlitz County, Wash.; Diking, Drainage, and Improvement
Districts Numbered.1, 2, and 13; special report in Office of the Chief of Engi-
neers; estimated construction cost in the Flood Control Act of 1936, $210,400.
Revised construction cost, $214,390.
   Local cooperation.-See page 6.
   Condition at end of fiscal year.-The project has been partially
completed with funds administered by the Works Progress Admin-
istration.
   Proposed operations.-The funds allotted will be expended during
the fiscal year 1938 for flood-control works, by contract, and will be
applied as follows:

                                                                                                         Regular      Relief      Total
                                                                                                          funds       funds

Cowlitz drainage district no. 1, Cowlitz County, Wash.:
   Levee construction_----___-___---------...                                                              $4, 110     $1, 225      $5, 335
   Bank protection ....       -------------------------------------------                                      847         253       1, 100
   Drainage works...............................................-----------------------------------------. 31,053       9, 262      40, 315
      Total-...------             -----------------------.......-----------------                          36, 010      10, 740     46, 750
Diking improvement district no. 2, Cowlitz County, Wash.:
   Bank protection....-----------------------------------------78,                                            437      51, 143     129, 580
   Drainage works.........................................------------------------------------------..      5, 081       1, 519      6, 600
      Total               ------------------------------------------                                       83, 518     52, 662     136, 180
Diking improvement district no. 13, Cowlitz County, Wash.:
   Bank protection--......         ..-------------------------                   .                         16, 661      10, 839     27, 500
   Drainage works------------------.................................................                        2, 559       1, 401      3, 960

                                                                                                           19, 220      12, 240     31, 460
      Grand total...............                      ---... --...................                        138, 748     75, 642     214, 390
   RIVERS AND HARBORS-FIRST PORTLAND, OREG., DISTRICT                                                                                        1525
   No funds can be profitably expended during the fiscal year 1939,
since the work proposed with available funds is expected to complete
the project.
     32. WILLAMETTE RIVER, OREG. (EMERGENCY RELIEF-FLOOD
                           CONTROL)

  With Emergency Relief funds, a small amount of bank-protection
work was done, with hired labor, at a cost of $280.89. Expenditures
for the year were $675.45. Total costs and expenditures for bank
protection, with Emergency Relief funds, to June 30, 1937, were
$300,000.
  Survey of Willamette River Valley, concerning flood control and
the proper utilization of its water resources, was completed. Costs
for the year were $1,942.24. Expenditures for the year were $18,-
106.58. Total costs of the survey to June 30, 1937, from Emergency
Relief funds, were $179,417.36. Total expenditures to June 30, 1937,
were $185,000.
                                                  Cost and financial summary
Cost of new work to June 30, 1937_-...                                              __          __-______-----                   1-$479, 417. 36
Cost of maintenance to June 30, 1937
      Total cost of permanent work to June 30, 1937-------                                                                            479, 417. 36
Undistributed costs June 30, 1937_-------------------------                                                                             5, 582.64

       Net total cost to June 30, 1937---------     --                                                       ________-             485, 000. 00
Net total expenditures__--___-- ---------
                                  __---                                                                                           1485, 000. 00
Total amount appropriated to June 30, 1937__--- ---                                                        __-__-- -              1485, 000.00

           Fiscal year ending June 30                            1933               1934                 1935              1936             1937

Cost of new work__.___------....                              ----------............----------........------............
                                                                                                                 ------ $477, 194. 23      $2, 223. 13
Cost of maintenance ...-                      .---.---                                   -               --- -            --      -
Total expended..._         _         _---------------,         _--------,          ,
                                                                              ------------------------                466, 217. 97         18, 782. 03
Allotted        .---------------------                   ----------------------------------- 485,000.00 ---------..........


Balance unexpended July 1, 1936______---_                         $18, 782. 03
                                                           -_________---
Gross amount expended ______---------_             $18, 825. 66
Less:
    Reimbursements collected_----------    $40. 63
    Receipts from sales ----_--------    -   3. 00
                                                                                                                 43. 63
                                                                                                                                        18,782.03
   1 Includes $185,000 for survey.

     Status of reports called for by river and harbor acts and committee resolutions

           Locality                      Authorization act
                                                                      Transmitted
                                                                      toCongress
                                                                       totion
                                                                                                   Document
                                                                                                   Document no.
                                                                                                            no.                       Recommend
                                                                                                                                      Recommenda-


Alsea Bay, Oreg-.......               River      and      Harbor      Nov. 9,1936 .........--------------------...............        Unfavorable.
                                         Act, Aug. 30, 1935.
Baker Bay, Columbia                   Rivers and Harbors Apr.                    1, 1937        .----------------------- Do.
River, Wash.                           Committee resolu-
                                       tion, Nov. 15, 1935.
Chetco Cove, Oreg......               Rivers and Harbors ...
                                       Committee resolu-
                                       tion, Aug. 5, 1937.
    Do----------..................    Senate Committee res- .......................................
                                        olution, Mar. 20,
                                        1937.
1526          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Status of reports called for by river and harbor acts and committee resolutions-Con.

        Locality               Authorization act        Transmitted
                                                        to Congress                                           Document no.     Recommenda-
                                                                                                                                   tion


Columbia River and          Flood Control Act,
tributaries, Washing-        June 13, 1934.
ton (preliminary ex-
amination for flood
control).
Columbia River at           River and Harbor            Apr.                        2, 1937         House, 203, 75th Cong.,    Favorable.
Ranier, Oreg.                Act, Aug. 30, 1935.                                                    1stsess.
Columbia River, Wash..      Rivers and Harbors
between Chinook and          Committee resolu-
head of Sand Island.         tion, June 4, 1936.
Columbia River, Lake        River and Harbor            Nov. 19, 1936                               ......................     Unfavorable.
River, and Vancouver         Act, Aug. 30, 1935.
Lake, near Vancouver,
Wash.
Columbia River, mouth       Rivers and Harbors
of Willamette River,         Committee resolu-
Oreg., to 1 mile above       tion, Apr. 29, 1937.
Vancouver, Wash.
Columbia River, in vi-       Flood Control Com-
cinity of Warren,             mittee resolution,
Oreg. (flood control).        July 28, 1937.                                                      ........................
Coos River and tribu-        River and Harbor
taries, Oregon, flood         Act, Aug 30, 1935.
control and erosion.
Coquille River, bar and      Rivers and Harbors         Apr. 27, 1937                              ........................        Do.
                                                                                                    ........................
entrance, Oregon.             Committee resolu-
                              tion, May 20, 1936.
Coquille River, Oreg.        Flood Control Act,
  (preliminary exami-          June 11, 1935.
  nation for flood con-
  trol).
Cowlitz River, Wash., Flood Control Act,
  and tributaries (pre-      June 13, 1934.
  liminary examination
  for flood control).
De Poe Bay, Oreg-.....-- River and Harbor Apr. 2,1937 House,                             202, 75th                             Favorable.
                             Act, Aug. 30, 1935.                      Cong., 1st sess.
Kilchis River, Tilla- Flood Control Act, . .- -- - -- -
  mook County, Oreg.         June 11, 1935.
  (preliminary examina-                                         .......................
  tion for flood control).
Knappton, Wash., chan- River and Harbor .- - - - - - -
  nel at.                    Act, Aug. 26, 1937.                ........................
Lewis River and tribu- Flood Control Act, . . . . . . --- --
  taries,     Washington     June 13, 1934.
  (preliminary examina-
  tion for flood control).
Miami River, Tilla- Flood Control Act,                  .   .
                                                                ........................
                                                                .   .   .   .   .     .   .-   -

  mook County, Oreg.         June 11, 1935.
  (preliminary examina-
  tion for flood control).
Necanicum River, Oreg. River and Harbor . . . .--- --
                             Act, Aug. 26, 1937.
Nehalem River, Tilla- Flood Control Act, . . . . . . . . ----
  mook County, Oreg.         June 11, 1935.
  (preliminary examina-
  tion for flood control).
Nehalem River and trib- Flood Control Act,
  utaries, Clatsop, Co-      Feb. 26, 1936.
  lumbia, and Washing-
  ton Counties, Oreg.
  (preliminary examina-
  tion for flood control).
Port Orford, Oreg......    Senate committee res-
                             olution, Apr. 23,
                             1936.
Rogue River and tribu- Flood Control Act,
  taries, Oregon (prelim-    July 1, 1935.
  inary examination for
  flood control).
Rogue River, Oreg.....     Rivers and Harbors
                             Committee resolu-
                             tion, Feb. 16, 1937.
Siletz River and tribu- Flood Control Act,
  taries, Oregon (prelim-    July 1, 1935.
  inary examination for
  flood control).
Siuslaw River and bar, Senate committee res- Jan.       7, 1937 ..--------                                                     Unfavorable.
  Oregon.                    olution, Oct. 23,
                             1935.
RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                                                                                      1527
Status of reports called for by river and harbor acts and committee resolutions-Con.


        Locality


Siuslaw River and tribu- Flood Control Act,
  taries, Oregon (prelim-   July 1, 1935.
  inary examination for
  flood control).
Skipanon Channel, Oreg_ Rivers and Harbors           Apr.         2,1937         House, 201,75th Cong.,                           Favorable.
                            Committee resolu-                                     1stsess.
                            tion, Jan. 30, 1935.
Skipanon Channel, Oreg. River and         Harbor    .....do          ..       -.... do_---------                                      Do.
  (deepening and widen-     Act, Aug. 30, 1935.
  ing channel).
Skipanon River, Oreg_-_ Senate committee res-                        do_---_- __
                                                     ... do..... .....                                                                Do.
                            olution, May 8, 1935.
Skipanon River, Oreg.     River and Harbor                                    .....do -- -                    .- - - -                Do.
  (modification existing    Act, Aug. 30, 1935.
  project).
Smugglers Cove (Short     River    and Harbor       -- - -- - -- -
  Sands Beach).             Act, Aug. 26, 1937.
Tillamook River, Tilla-   Flood Control Act,        -- - -- - -- -
  mook County, Oreg.        June 11, 1935.
  (preliminary     exami-
  nation for flood con-
  trol).
Trask River. Tillamook    Flood Control Act,
  County, Oreg. (pre-      June 11, 1935.
  liminary examination
  for flood control).
Umpqua Harbor and         Senate Committee res-
  River, Oreg.              olution, May 14,
                            1937.                                                                                                 4
Umpqua River and trib- Flood Control Act,
  utaries, Oregon (pre-     June 11, 1935.
                                                    --------------- ------------------------
                                                    --------     ------   -   - - - ---    ---     - ----   ----   --   --   --



  liminary examination
  for flood control).
Westport Slough, Oreg__ River and         Harbor     Aug. 12, 1936               House, 79, 75th Cong.,                               Do.
                            Act, Aug. 30, 1935.                                   1stsess.
Willamette River, Oreg., Senate Committee res-      .. - -- - -- -
  Portland to Eugene.       olution, Sept. 27,
                                                                               ........................
                            1933.
Willamette River, Oreg., River and        Harbor    ... . . . . -- --
  Eugene to Springfield.    Act, Aug. 30, 1935.
Willamette River, Oreg., Flood Control Act,         ...        -- - -- -
  (preliminary exami-       June 13, 1934.
  nation for flood con-
  trol).
Wilson River, Oreg.,      Flood Control Act,
  (preliminary     exami-  June 11, 1935.
  nation for flood con-
  trol).
Yaquina Bay, Oreg.,       Senate Committee res-      May 12,1937                 Senate committee                                     Do.
  river and entrance.       olution, Feb. 25,                                     print, 75th Cong.,
                            1936.                                                 1stsess.
Yaquina River and trib- Flood Control Act,
  utaries, Oregon (pre-    July 1, 1935.
  liminary examination
  for flood control).



   IMPROVEMENT OF RIVERS AND HARBORS IN THE
        SECOND PORTLAND, OREG., DISTRICT
  This district comprises the Snake River Basin and the Columbia
River Basin between the mouth of the Snake River and Vancouver,
Wash.
  District engineer: Lt. Col. Charles F. Williams, Corps of En-
gineers.
   Division engineer: Col. Thomas M. Robins, Corps of Engineers.
1528     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                               IMPROVEMENTS

                                  Page                                         Page
1. Columbia River between Van-           5. Columbia River and tribu-
     couver, Wash., and Bonne-                taries above Celilo Falls to
     ville, Oreg -                1528        the mouth of Snake River,
2. Columbia River at Bonne-                   Oreg. and Wash ----------        1541
              --------------
     ville, Oreg                  1529   6. Snake River, Oreg., Wash.,
3. The Cascades Canal, Colum-                 and Idaho _-----
                                                           _          --       1545
     bia River, Oreg-----------1536      7. Examinations, surveys, and
4. The Dalles-Celilo Canal, Oreg.
     and Wash_  ---------------   1538
                                              contingencies (general)----
                                         8. Plant allotment-------------
                                                                               1548
                                                                               1549
                                         9. Umatilla River, Oreg., flood
                                              control ___------------          1550

1. COLUMBIA    RIVER    BETWEEN VANCOUVER,             WASH.,    AND        BONNE-
                            VILLE, OREG.

   Location.-This improvement consists of construction of a ship
channel between the Interstate Bridge at Vancouver, Wash., and the
deep-draft ship lock at Bonneville Dam, 144 miles above the mouth
of the river. For description of Columbia River, see page 1487.
   Existing project.-This provides for a channel 27 feet deep at low
water and 300 feet wide between Vancouver, Wash., and Bonneville,
Oreg., 38.8 miles. The lower end of the project is about 105 miles
above the fmouth of the river.
   The tidal range between mean lower low water and mean higher
high water at Vancouver is about 21/2 feet and at Bonneville about
0.2 foot at low stages of the river. Extreme tidal ranges are about
3 feet and 0.4 foot, respectively. Annual freshets average about 21
feet at Vancouver, while the highest known stage reached 33 feet
above low water.
   The estimate of cost for new work, made in 1937, is $2,649,000.
The latest (1937) approved estimate for annual cost of maintenance
is $200,000.
   The existing project was adopted by the River and Harbor Act ap-
proved August 26, 1937 (Rivers and Harbors Committee Doc. No. 94,
74th Cong., 2d sess.). The latest published map is contained in the
project document.
   Terminal facilities.-The only terminal facilities at present avail-
able or suitable for ocean vessels on the stretch of the river under the
project are at Vancouver, Wash., where there is a municipal wharf.
There are also privately owned wharves for shipment of lumber and
other commodities and a privately owned grain elevator and wharf
at Vancouver, Wash.
   Above Bonneville, the port of The Dalles (mile 82.9 above Van-
couver) has constructed a wharf 125 by 1,100 feet for use of both
ocean vessels and river boats. There are two one-story timber and
corrugated iron warehouses, each 94 by 461 feet, on this wharf. The
port has also constructed a concrete and timber oil wharf 27 by 193
feet, about a mile below the main wharf. There are also privately
owned facilities for handling petroleum products from river boats.
   Operations and results during fiscal year.-None.
   Condit on at end of fscal year.-No work has been done on the
project. Controlling depth at low water over some of the bars
between Vancouver and Bonneville is about 7 feet. During average
summer freshet the controlling depth is increased to from 25 to 30
feet.
RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                    1529
  Proposed operations.-The sum of $834,400 can be profitably ex-
pended during the fiscal year 1939 as follows:
New work :
   Dredging to complete the channel to project depth between
     Vancouver (mile 0.0) and Fisher Landing (mile 8.5) --------    $735, 400
   Construction of six pile dikes (total length 6,600 feet)------     99, 000
      Total for all work-------------------------------------        834, 400
                         Cost and financial summary
Amount (estimated) required to be appropriated for completion of
                 -
existing project_   -----------    ---------------------------  $2, 649, 000
Amount that can be profitably expended in the fiscal year ending
June 30, 1939, for new work-----------------------------------      834, 400
              2. COLUMBIA RIVER AT BONNEVILLE, OREG.

   Location.-On the Columbia River, 42 miles east of Portland, Oreg.,
about 144 miles above the mouth of the river. For description of the
Columbia River see page 1487.
   Existing project.-This project provides for construction of a dam,
power plant, and lock, for power and navigation. The spillway dam
is of concrete gravity type, having an over-all length of 1,230 feet
and extending across the main river channel from the Washington
shore to Bradford Island, which divides the river at this point. The
overflow crest at 24 feet above mean sea level is surmounted by 18
vertical-lift steel gates, creating a normal pool level at 72 feet above
mean sea level. The gates are placed between piers which extend to
elevation 99 feet where a service roadway permits the operation of
two 350-ton gantry cranes for regulating the gates.
   The power-house extending across Bradford *Sloughto the Oregon
shore will have an initial installation of 2 units of 43,000 kilowatts
each and skeleton structure for 4 more (ultimate installation, 10 to 12
units). The ship lock will have a single lift, with clear dimensions
of 76 feet in width, 500 feet in length, and a depth of 24.2 feet over
the sills at adopted low water. The lift at extreme low water and
normal pool level is 66 feet. The project provides also for fish lad-
ders and locks to serve both the main channel and the Bradford
Slough Channel. The lock and power-house are founded on andesite
rock, and the main dam will rest upon solidified sedimentary rock of
volcanic origin.
   The ordinary and extreme fluctuations of the river at the lower
lock gate are about 21 and 47 feet, respectively.
   The estimated cost of the dam, lock, two power units, and fishways,
revised in 1937, is $52,250,000. The estimate of cost for annual
operation and maintenance, made in 1937, is $312,000, of which
$170,770 is for power and $141,230 for navigation.
   This project was authorized September 30, 1933, by the Federal
Emergency Administration of Public Works and adopted by the
River and Harbor Act of August 30, 1935 (Senate committee print,
73d Cong., 2d sess.). The act approved August 20, 1937 (Public, No.
329, 75th Cong.), authorized the completion, maintenance, and opera-
tion of the Bonneville project under the direction of the Secretary of
War and the supervision of the Chief of Engineers, subject to certain
provisions contained therein relating to the powers and duties of the
Bonneville power administrator.
   Terminal facilities.-None.
1530     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Operations and results during fiscal year-Emergency funds.-
Work on the south half of the dam and appurtenant structures was
continued, and all concrete masonry was placed except for five inter-
pier diversion slots. The north cofferdam was completed in August,
and concreting operations on the north half of the dam and integral
fishways commenced early in September; all masonry work was com-
pleted except for the superstructure, crane rail girders, and fishway
structure. Removal of the north cofferdam was started in March and
completed in April. Approximately 295,000 cubic yards of concrete
were placed in the main dam and appurtenant structures during the
fiscal year. This work was done by contract. In May work started
on the revision of the Big White Salmon fish hatchery. The total
cost of new work done under emergency funds for the year amounted
to $7,701,361.37. Total expenditures were $8,472,474.79.
   Regular funds.-Shop work on the spillway dam gates and cranes
was practically completed, and 1 crane and 23 gate sections were
erected in the field. The contract for the power-house superstructure
and Bradford Island was completed in June 1937. Approximately
21,000 cubic yards of concrete were placed in these structures during
the fiscal year. Field erection of the power-house gates and indoor
overhead traveling cranes was completed in September. Miscellaneous
pumps and compressors and machine-shop equipment for the power-
house were installed. The station-service unit was completed except
for installation of governors and testing. Manufacture of the main
turbines and generators was completed and erection operations were
started in February and March, respectively. The 2,400-volt switch-
gear and main lighting switchboard installations were practically
completed. Shop work was continued on the 16,000-kilovolt-ampere
transformers, and manufacture was started on the 480-volt distribu-
tion centers, on the metal-enclosed control equipment, on the 15,000-
volt switchgear and busses, and on the 480-volt power switchboard.
Construction of the remaining upper guide wall pier foundations
was started in February and completed in March, and work on the
concrete filler block was commenced in February and finished in
April. Fabrication of the miter gates and operating equipment was
continued, and field erection was started in April. Work on the
chain fender block was begun in June. Appraisal, preliminary ne-
gotiations as to flowage, examination of abstracts of title, and clear-
ing defective title to lands affected by flowage were continued. Six-
teen hundred and forty-nine acres of approximately 2,624 acres of
the reservoir site have been cleared, 878 acres on the Oregon shore
and 771 acres on the Washington shore. Structural steel frames
and radial gates for the fishways were received. The total cost of
new work done under regular funds for the year amounted to
$7,080,058.87. Total expenditures were $6,696,951.26.
   Condition at end of fiscal year.-The entire existing project is 84
percent complete. Power-house facilities: The power-house substruc-
ture and superstructure are complete. The gates, cranes, and ma-
chine-shop equipment are in operation. Shop work on the main
generators and turbines is complete, and installation is under way.
The station-service unit installation is complete except for govern-
ing equipment. Approximately three-fourths of the transformer and
switchgear facilities are under contract. The 2,400-volt switchgear,
the 1,667-kilovolt-ampere transformers, and the main lighting switch-
RIVERS AND HARBORS-SECOND              PORTLAND, OREG., DISTRICT            1531
board installations are nearly complete. The power-house facilities
are about 88 percent complete.
   Navigation facilities.-The navigation-lock masonry is complete ex-
cept for the chain fender block. The lower approach canal excava-
tion and riprap and the bobtail swing-span bridge, except for instal-
lation of permanent control equipment, are complete. The tainter
valve machinery and floating mooring bitts are installed. Shop work
on the miter gates and operating machinery and field erection work
is under way. The navigation facilities are 91 per cent complete.
   Datm and reservoir.-Concrete masonry on the south half of the
dam is complete except for five interpier diversion slots, and the
masonry in the north half of the dam is complete except for the
superstructure. Cofferdams are removed. One spillway dam crane
is in operation, and shop work has been completed on the other.
Erection of the spillway dam gates is under way. The dam is esti-
mated to be 88 percent complete. For the 5 miles of river below
Cascade Rapids, acquisition of lands is complete. Satisfactory agree-
ments have been reached on 77 percent of the acreage to be inundated.
No agreements have been reached on the remaining 23 percent which
will be condemned in the courts. Trains are operating on the Spo-
kane, Portland & Seattle Railroad and on the Union Pacific Railroad
relocated tracks. Negotiations are being continued with the rail-
roads and State highway commissions relative to highway and rail-
road relocation above Cascade locks. Approximately 62 percent of
the reservoir-basin clearing has been completed. The channel im-
provements are complete except for the removal of Cascade lock
gates and the channel improvement at Three Mile Rapids.
   Fishways.-The powerhouse collecting system, fish locks, and navi-
gation lock bypass, the Bradford Island ladder, and the Bradford
Island collecting system and fish locks are complete except for operat-
ing machinery and equipment. The Washington shore collecting
system and fish locks and the Washington shore ladder are under
construction. The fishways are 72 percent complete.
    Permanent building and grounds.-Twenty permanent dwellings,
recreation buildings, administration building, and landscaping of
grounds are complete.
    The total costs of the work done under emergency funds to the
end of the fiscal year amounted to $32,426,407.70; total expenditures
were $32,425,780.27.
    The total costs of the work done under regular funds to the end
of the fiscal year amounted to $9,171,394.22; total expenditures were
 $8,864,003.54.
    The total costs, all funds, were $41,597,801.92 for new work. The
total expenditures were $41,289,783.81.
    Proposed operations.-The balance of emergency (Public Works
Administration) funds unexpended June 30, 1937, $14,925.43, and the
balance of regular (maintenance and improvement) funds unex-
pended June 30, 1937, $2,960,272.41, together with $7,000,000 allotted
during July 1937 will be applied as follows:
             A.   EMERGENCY FUNDS   (PUBLIC WORKS ADMINISTRATION)

Accounts payable, June 30, 1937 -      --        -______ - -.       -     $633. 13
New work: Revision of Big White Salmon fish hatchery, by con-
  tract, July to August 1937----------------___---                      14, 292. 30
      Total for all work, emergency funds_ ---       _------        - 14, 925. 43
1532       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                B. REGULAR FUNDS      (MAINTENANCE AND IMPROVEMENT)

Accounts payable, June 30, 1937__----------------------------                    $688, 926. 17
New work:
    Navigation facilities:
         Completion of lock structure, upper guide wall extension,
           miter gates, chain fender structure and machinery, and
           other miscellaneous work, by contract, July to Decem-
            ber 1937---------          ----------------------------- _            488,000.00
         Purchase and installation of lock control equipment and
           other miscellaneous work by hired labor, July to Decem-
           ber 1937----------------------------------------                        63,000.00
    Power-house facilities:
         Complete construction and installation of communication
           system, two 43,200-kilowatt generators, and 115 kilovolt
           switch structure, by contract, July to December 1937___                816, 000. 00
         Purchase and installation of CO2 equipment, cable, wire,
           and terminal boards; trash sluice gates, hoists, and
           racks; electrical heaters, switchgear structures; 115-
           kilovolt disconnect switches, oil circuit breakers, busses,
           potential transformers, and miscellaneous fittings;
           main control switchboards, 16,000-kilovolt-ampere trans-
           formers, and two 60,000-horsepower turbines, by hired
           labor, July 1937 to May 1938____________--------------                 548, 000. 00
    Fishway facilities:
         Completion of spillway dam fishways, by contract, July
           to December 1937--------------------------------                       174, 000.00
         Purchase and installation of all mechanical and electrical
           equipment, screens, gates, and stop logs for fish ladders,
           by hired labor, July 1937 to April 1938__------------                  502, 000. 00
    Dam and reservoir:
         Dam and abutments: Complete construction of gates,
           gantry cranes, gallery elevator, and spillway structure,
           by contract, July to December 1937-------------_---                 1, 391, 000. 00
         Purchase and installation of electrical and gate pit main-
           tenance equipment, control houses, and miscellaneous
           items, by hired labor, July to December 1937-_-_- _                    132, 000. 00
    Highway: Revision and protection, by settlement, October
      1937---        ----     -------------------------------------               537, 000. 00
    Railroad:
         Riprap and drainage tunnels by contract, August to De-
           cember 1937------------------------------------256,                         000. 00
         Revision and protection, by settlement __ _____________ 2, 726, 346. 24
    Basin clearing, by hired labor, July to December 1937___---                   105, 000.00
    Channel improvements: Removal of rock pinnacles and islands
      in pool area by hired labor, July to December 1937              -- ___ -     15, 000. 00
    Protective works: Dalles City and other locations:
         By contract, August 1937 to March 1938_____________                      554, 000. 00
         By settlement, October 1937___________________________                    70, 000. 00
    Reservoir lands: Purchase and condemnation of flowage
         easements, fiscal year 1938-_- -               ____________________      742, 000. 00
    Permanent buildings: Sewer, water, living facilities, by con-
      tract, July to August 1937___________________________                 _      52, 000. 00
       Total for new work__________________________________ 9, 860, 272.41
    Maintenance (operating and care), January to June 1938:
       Operation:
            Powerhouse and dam _____________       _ $40,000.00
            Lock and fishways------------------- 30, 000.00
            Ordinary repairs________________
                                     .             _ 25, 000. 00
            Emergencies--------------------------      5, 000. 00
                Total for maintenance ______________                             100, 000. 00
                Total for all work, regular funds_--------------              9, 960, 272. 41
     RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                                                                            1533
  It is expected, with the proposed expenditures, the project with
initial installation of two units, will be completed except for the pur-
chase and installation of equipment for the fish lifts and miscellane-
ous items of work in the powerhouse, lock, and spillway dam.
  The additional sum of $988,000 can be profitably expended during
the fiscal year 1939 for new work and maintenance (operating and
care) as follows:
New work :
   Navigation facilities: Raising tainter machinery by hired labor,
     July 1938-------------------------------------- --------                $4, 300
   Power-house facilities: Complete interior painting and install tile
     floor in the generator room, by hired labor, July to December
     1938---------------------------------------------------------           2-1, 900
   Fishway facilities:
        Purchase and installation of fish-lift equipment, by hired labor,
          July to November 1938_-----------------------------_----          277,800
        Purchase and installation of revolving crane for power-house
          fish lifts and construction of concrete bridge over fish ladders,
          by contract, July to December 1938_------------------              39, 700
        Construction of Tanner Creek fish ladder, by contract, July to
          December 1938---------------------------------             --     300, 000
   Dam and abutments: The purchase and installation of gate indi-
     cator mechanism and drift equipment, and the construction of
     approach roadways, by hired labor, July to December 1938                32, 300                                    ----
                           Total for new work-__                           __          ______-------------                       676, 000

Maintenance (operating and care) :
    Operation of dam, lock, fishways and power-house------------                                                                 227, 000
    Ordinary repairs------------------------------                                                                                 5, 000
                                                                                                                                  6---------------
    Emergencies----------------------------------                                                                                 20, 000

                Total for maintenance --------                                             -------------                         312, 000

                 Total for all work, regular funds----------------------------                                                   988,000

                                                               Cost and financial summary
                                                    MAINTENANCE           AND IMPROVEMENT         FUNDS

Cost of new work to June 30, 1937 ________-----------___-$9, 171, 394. 22
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937__________                                                             9,171, 394. 22
Undistributed costs June 30, 1937--_---            _
                                        ---------------                                                                     365, 259. 54
      Net total cost to June 30, 1937-------__________                                                                   9, 536, 653. 76
Plus accounts receivable June 30, 1937----------- ____- ____-                                                                16, 275. 95
      Gross total costs to June 30, 1937------------------------                                                          9,552, 929. 71
Minus accounts payable June 30, 1937--------_-------------6_                                                                 88, 926. 17
     Net total expenditures___________---------________                                                                  8,864, 003. 54
Unexpended balance June 30, 1937---------------------------                                                              2,943, 996. 46
                Total amount appropriated to June 30, 1937_______________ 11, 808, 000. 00

      Fiscal year ending June 30                                   1933         1934            1935             1936             1937


Cost of new work------------                                    -- $2, 091,     35 $7, 080,058. 87
                  ......................----------------------------..............-----.....
                                                                           335.
Cost of maintenance....---------- -------- --- - -.------------      ------------ -------------
Total expended .........                                 ..    .   ..                  .      __
                                                                                               . ____ 2,167, 052. 28           6, 696, 951.26
Allotted---------------------------.........................        -......                                  9,975,000. 00     1,833, 000. 00
1534                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936---            __------
                                               ______                                                                     $7, 807, 947. 72
Amount allotted from War Department Appropri-
ation Act approved Apr. 9, 1935------------- $97, 100. 34
Amount allotted from War Department Appropri-
ation Act approved May 15, 1936-----------1, 354, 175.99
Amount allotted from Second Deficiency Act of
  1935------------------------------------    441, 723. 67
                                                                                                                           1, 893, 000. 00
      Amount to be accounted for- -__--___
                                    ___                                                                                    9, 700, 947. 72
Deductions on account of revocation of allotment------------                                                                   60, 000. 00

      Net amount to be accounted for ____                                                                                  9, 640, 947. 72
Gross amount expended      -.-.-    -__---- -      $6, 856, 735.41
Less:
    Reimbursements collected----- $159, 368. 02
    Receipts from sales -----------        416. 13
                                                        159, 784. 15
                                                                                                                           6, 696, 951. 26
      Balance unexpended June 30, 1937-__-_________--_                                                                     2, 943, 996. 46
Outstanding liabilities June 30, 1937___--_
                                         -----  $393, 438. 82
Amount covered by uncompleted contracts ---- 2, 338, 745. 39
                                                                                                                           2, 732, 184. 21

     Balance available June 30, 1937                                            --     ______                                    211, 812. 25
Accounts receivable June 30, 1937_                                                                                                16, 275. 95

     Unobligated balance available June 30, 1937 __------                                                                       - 228, 088. 20
Amount allotted from War Department Civil Appropriation
Act approved July 19, 1937 --  - -----------------------                                                                  7, 000, 000. 00

     Balance available for fiscal year 1938--_________-__                                                                  7, 228, 088. 20
Amount (estimated) required to be appropriated for completion
of existing project 1___________________________                                                                                676, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1---------------------------------------                                                                          76, 000. 00
   For maintenance 1-------------------------------------                                                                        312, 000. 00

            Total 1----------------------------------                                              ------                        988, 000. 00
                                                    PUBLIC WORKS                FUNDS

Cost of new work to June 30, 1937__-----------------------                                                               $32, 426, 407. 70
Cost of maintenance to June 30, 1937    __      ____   __

      Total cost of permanent work to June 30, 1937 __-                                                           __      32, 426, 407. 70
Plus accounts receivable June 30, 1937---   _______--__                                                           -                  5. 70

      Gross total costs to June 30, 1937______     ______--_                                                             32, 426, 413. 40
Minus accounts payable June 30, 1937--_---_ -_____---__    _                                                                      633. 13

     Net total expenditures--___--  ___-___-___-___       32, 425, 780. 27
Unexpended balance June 30, 1937 ------     __ -   -______     14, 919. 73

            Total amount appropriated to June 30, 1937 __________-                                                        32, 440, 700. 00

Fiscal year ending June 30                  1933                1934                     1935                    1936                 1937


Cost of new work...------.......--..------------......       $1, 918, 746. 98    $10, 785, 190. 17          $12, 021, 109. 18     $7, 701, 361. 37
Cost of maintenance--..---- --------------------                                ------------            ------------------------
Total expended _______....... -------- _---              -   1, 837, 651. 96         10, 503, 200. 26        11, 612, 453. 26      8, 472, 474. 79

Allotted---------------------------                          20, 240, 700. 00        12, 200, 000. 00


    1 Exclusive of available funds.
RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                                                                          1535
Balance unexpended July 1, 1936                                                -_     ___                    $8,487, 394.52
Gross amount expended --------------                                    -      $8,505,273.66
Less reimbursements collected -      ------------                                  32, 798. 87
                                                                                                                8,472, 474. 79

      Balance unexpended June 30, 1937---------------------                                                           14,919.73
Outstanding liabilities June 30, 1937-----------     590. 18
Amount covered by uncompleted contracts-------   14, 329. 55
                                                                                                                      14, 919. 73

     Balance available June 30, 1937
Accounts receivable June 30, 1937_---------------                                           ------------                         5. 70
           Unobligated balance available June 30, 1937---------- _                                                               5. 70
CONSOLIDATED           COST AND FINANCIAL SUMMARY FOR COLUMBIA RIVER AT BONNEVILLE,
                                             OREG.

Cost of new work to June 30, 1937----- --                                          __-- -         _____$41, 597, 801. 92
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937 _______--41,                                                  597, 801. 92
Undistributed costs June 30, 1937 -- ___- ___-----___    ____--_                                                  365, 259. 54

      Net total cost to June 30, 1937_______ _____________                                                   41, 963, 061. 46
Plus accounts receivable June 30, 1937___--------------   __                                                      16, 281.65

      Gross total costs to June 30, 1937_______________________                                              41, 979, 343. 11
Minus accounts payable June 30, 1937 ---------------------- _                                                    689,559.30

     Net total expenditures______                                                  -
                                                                             - __------ - _                  41,289, 783. 81
Unexpended balance June 30, 1937---------- --                                        --------_                2, 958,916. 19

           Total amount appropriated to June 30, 1937_____________                                           44,248, 700. 00

Fiscal year ending June 30              1933         1934                   1935                   1936                   1937


Cost of new work__
                 -------------------            $1, 918, 746. 98    $10, 785, 190. 17       $14, 112, 444. 53        $14, 781, 420. 24
Cost of maintenance ..----------------         ------------- ---------------------------                  --------         ----------------
Total expended ....         -    -----------      1, 837, 651. 96    10, 503, 200. 26        13, 779, 505. 54         15, 169, 426. 05

              ------------------
Allotted-----___                                20, 240, 700.00      12, 200, 000. 00         9, 975, 000. 00          1,833, 000. 00


Balance unexpended July 1, 1936-------------------------        $16,295,342.24
Amount allotted from War Department Appro-
  priation Act approved Apr. 9, 1935 --__-------  - $97,100.34
Amount allotted from War Department Appro-
  priation Act approved May 15, 1936------------ 1,354,175. 99
Amount allotted from Second Deficiency Act of
  1935_----------------------------------------     441,723. 67
                                                                  1, 893. 000. 00

     Amount to be accounted for-----------____________________________ 18, 188, 342. 24
Deductions on account of revocation of allotment--------------              60, 000. 00
      Net amount to be accounted for_______________________---
                                          -----------                                                        18, 128, 342.24
Gross amount expended---------------------- $15,362,009.07
Less:
       Reimbursements collected --                      $192, 166. 89
       Receipts from sales-----------                         416. 13
                                                                                       192, 583.02
                                                                                                             15, 169, 426.05

           Balance unexpended June 30, 1937--------__                                       -2,                   958, 916.19

          20196-37-pt. 1-97
 1536         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937 -----------                                    $394, 029. 00
Amount covered by uncompleted contracts                                -------      2, 353,074. 94
                                                                                                            $2, 747, 103. 94

     Balance available June 30, 1937   --------------------                                                        211, 812. 25
Accounts receivable June 30, 1937----------------------------                                                       16, 281. 65

     Unobligated balance available June 30, 1937----------                                                         228, 093.90
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------                                                     7, 000, 000.00

     Balance available for fiscal year 1938------------------7, 228, 093 .90
Amount (estimated) required to be appropriated for completion
of existing project --------      ----        ---------        676, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
   For new work 1                                                                                              676, 000. 00
   For maintenance              1_____-_____-______-_______-___
                     ----------------------------------
                                                          -___                                                 312, 000.00

         Total                                                                                                  88, 000. 00
                                                                                                               9-----------------------------
   1Exclusive of available funds.

            3. THE CASCADES CANAL, COLUMBIA RIVER,                                                      OREG.

   Location.-This improvement includes about 41/2 miles of the river
where it passes through the Cascade Range. There is a fall, at low
water, of 24 feet in the upper one-half mile, and a total fall of about
37 feet to the foot of the lower rapid. For general description of
Columbia River see page 1487 (see United States Geological Survey,
Mount Hood quadrangle).
   Existing project.-This provides for a canal with one lock around
the upper Cascades Rapids and open-river improvement below the
canal. The section of river under improvement is about 41/2 miles
in length, and its lower end is about 141 miles from the mouth of
the river. The canal has a length of 3,000 feet and a clear width
of 90 feet between side walls. The lock is located at the lower end
of the canal and has two chambers in flight, with detailed informa-
tion as follows:
                                             Dimensions of lock

                                                                          Dimensions                 Lift
                                                                                                                       Control-
             Lock                       Foundation                     Greatest                                             hling
                                                                                                                       depth,
                                                                      available
                                                                           llength Clear    At low      At high        at low
                                                                        for full   width    water        water         water
                                                                        width

                                                                        Feet       Feet      Feet           Feet         Feet
Lower chamber_.....-----.-..-      Rock--------------..............        469         90       24                 0              8
Upper chamber       .       ....-------------
                                  ----.do------------..........            462         90           0          18                 5


  There are no dams on the canal. The lower chamber only is used
up to a 13-foot stage (upper pool), after which the upper chamber
alone is used up to a 42-foot stage, lower gage, when the canal is
"drowned out."
  The ordinary summer freshets reach a stage of 42 feet at the foot
of the canal and 30 feet at the upper entrance. The highest freshet
of record (1894) reached a height of 60 feet at the lower entrance
 RIVERS AND HARBORS--SECOND PORTLAND, OREG., DISTRICT                               1537
and 50 feet at the upper entrance. Freshets occur during the winter
months, due to rains, and reach a stage of 15 feet at the lower gage,
but do not interfere with the navigation of the canal. Ice conditions,
which often close the river to navigation, occur usually in January or
February.
   The estimate of cost for new work, revised in 1894, including
$413,360 for the second lock chamber and protective works, was
$3,856,763.
   The existing project was authorized by the following river and
harbor acts: The act of August 14, 1876, provided for the construc-
tion of a canal around the Cascades of the Columbia, in the State of
Oregon, and the act of July 13, 1892, provided for contracts to com-
plete the project; the act of June 3, 1896, provided for the second
lock chamber and protective works (Annual Report for 1895, p.
3571); and the act of June 13, 1902, provided for the removal of
obstructive rock in the rapids below the canal. Operation and care
of the canal were included in the project July 1, 1935, under the
provisions of the Permanent Appropriations Repeal Act approved
June 26, 1934. For latest published map, see Senate Executive Docu-
ment No. 26, Fifty-third Congress, third session.
   Terminal facilities.-None.
   Operations and results during fiscal year.-The canal was in serv-
ice throughout the fiscal year, except for closure due to ice condi-
tions between January 6 and February 17, 1937, and closure of 2
hours on September 7 for lock-gate valve repairs.
   Costs and expenditures during the year from regular appropria-
tions were as follows:
Operation and care of locks and dams:
     Costs -_                                                 ___   _----- $16, 211.59
     Expenditures---------        ------------------------------             16, 053. 95
   Condition at end of fiscal year.-The canal, completed in 1914, is
in excellent condition. The cost and expenditure for construction
were $3,903,780.30. There has been considerable traffic during the
past 5 years, due to log rafting and wheat shipments from the river
above the canal. The controlling depth in the canal is 5 feet over
the sills at low water.
   The costs for operation and care to June 30, 1937, were $26,187.32.
The total expenditures were $26,629.07. In addition, the sum of
$526,364.99 was expended between November 5, 1896, and June 30,
1935, on the operation and care of the works of improvement under
the provision of the permanent indefinite appropriation for such
purposes.
  Proposed operations.--The funds unexpended June 30, 1937
$126.55, together with $8,000 allotted July 21, 1937, will be applied
as follows:
Accounts payable, June 30, 1937--------------------------------                   $58. 30
Maintenance (operating and care) :
    Operation-------------         -----               ----- $4, 200.   00
    Ordinary repairs--------------------------------             400.   00
    Channel work----------------- ----------------            3, 300.   00
    Emergencies-----------------   -------------------           168.   25
                                                                             8, 068. 25

      Total -------------------------                                        8.   126. 55
1538          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   This project will be submerged and can be abandoned upon comple-
tion of the Bonneville project about January 31, 1938. No additional
funds will, therefore, be required subsequent to date of abandonment.
                                    Cost and financial summary
Cost of new work to June 30, 1937---------------------------                                       $3, 90, 780. 30
Cost of maintenance to June 30, 1937                                                                  1 552, 552. 31

      Total cost of permanent work to June 30, 1937-------                                           4, 456, 332. 61
Undistributed costs June 30, 1937------------------------------                                              497. 95
      Net total cost to June 30, 1937--------------------------4, 456, 830. 56
Plus accounts receivable June 30, 1937                                   2. 10

       Gross total costs to June 30, 1937----------------------                                      4, 456, 832. 66
?Minus accounts payable June 30, 1937--------------------------58.                                                30

      Net total expenditures----------------------------------4, 456, 774. 36
Unexpended balance June 30, 1937                                      124. 45
         Total amount appropriated to June 30, 1937 --------------                                   4, 456, 898. 81

        Fiscal year ending June 30                1933           1934                 1935       1936           1937

Cost of new work-------------------------------------                   -----------
Cost of maintenance...    ...------------------ $19,801.89    $17,442. 14      $16, 397.95    $14, 12733      $16, 211.59
Total expended--------------------------        19,720.02      12,613.77         14,501.44     10, 870.83      16,053.95
Allotted--------------------------              16, 285. 47    11, 622.60       30, 200. 00     9, 639. 64


Balance unexpended July 1, 1936-------------------------------            $16, 178. 40
Gross amount expended                                     729. 23
                                                    $----------16,
Less reimbursements collected                              75. 28
                                                          6---------------------
                                                                            16, 053.95

      Balance unexpended June 30, 1937-----------------------                                                  124.45
Outstanding liabilities June 30, 1937                                                                                45
                                                                                                               1-------------------------

Amount allotted from War Department Civil Appropriation Act,
  approved July 19, 1937-------------------------------------                                                8, 000. 00
Accounts receivable June 30, 1937--------------------2.                                                              10

         Balance available for fiscal year 1938---------------------         8, 002. 10
   1Includes  $526,364.99 expended for operating and care from the permanent indefinite
appropriation.

               4. THE DALLES-CELILO CANAL, OREG., AND WASH.

  Location.-This improvement embraces about 12 miles of the Co-
lumbia River between The Dalles and Celilo, Oreg. (See U. S. Geo-
logical Survey Map of Oregon.)
  Previous projects.--Adopted by the River and Harbor Act of Au-
gust 18, 1894. The cost and expenditures were $47,112 83 for exam-
inations and surveys. For further details, see page 1993 of Annual
Report for 1915.
  Existing project.-This provides for open-river improvement from
the foot of Threemile Rapids to the foot of The Dalles (Fivemile)
Rapids, and a continuous canal on the Oregon shore from the foot
of The Dalles (Fivemile) Rapids to the head of Celilo Falls, the
RIVERS AND HARBORS-SECOND                                 PORTLAND, OREG., DISTRICT                               1539
canal to have a depth of 8 feet, width of 65 feet at the bottom, and
length of 81/2 miles, with five locks, as follows:
                                    Detailed information of locks

                                                       Dimensions              Lift
                        Miles                                                                  Avail-
from                                                 Great-                                    able     When
lower            Lock              Foundation           est                                    depth      com-     Cost
  en-                                                 length Clear      Low       High         lower     pleted
trance                                               able for width     water     water          sill
                                                      full
                                                     width


                                                      Feet     Feet      Feet         Feet      Feet
0       Tandems locks 1.... Rock........--------     265. 0   45. 0      70. 0        22. 0      7.0     1915    $477, 600
1. 6    Fivemile lock -.--------
                          -     _____   do ......     265. 0   45. 0      12. 0        15. 0      7. 0    1915     246, 700
5.2     Tenmilelock- - 2_  ____... ... do __..
                         -- -- -- --
                                                      265.0    50.0    - -              7.5       7.0     1915     149,600
8.1     Celilolock             ____    do -------    265.0    45.0     ____            6.5       7.0     1915     103,200

                      1 2 chambers in flight.                    2   Not used at low water.

   There are no dams in the canal. The lower end of the canal is
about 4 miles and the lower end of the Threemile Rapids about 11/2
miles above The Dalles, Oreg.
   The normal river freshets at the lower end of the canal reach a
stage of 45 feet and the highest flood 70 feet above low water. At
the upper end of the canal the normal freshets are about 18 feet and
the maximum rise 33 feet. The canal was designed to operate to a
stage of 18 feet at the upper pool and is then "drowned out" until the
river recedes to a stage of 18 feet.
   The estimate of cost for new work, revised in 1908, was $4,845,000,
exclusive of amount expended on previous projects. The estimate
of annual cost of operation and care, made in 1936, is $49,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1905 (Annual Report, 1904, p. 3475). Operation and care
of the canal were included in the project July 1, 1935, under the
provisions of the Permanent Appropriations Repeal Act approved
June 26, 1934. For latest published map see Annual Report for 1915,
page 3380.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are two warehouses fronting on the
Dalles-Celilo Canal, near the lower end, owned by private interests,
with a combined capacity of 15,000 tons of wheat. At The Dalles,
Oreg., a boat terminal has been built by the city, consisting of a pile
and timber wharf, 125 by 1,100 feet, with two one-story timber and
corrugated iron warehouses, each 94 by 161 feet. Warehouses are
equipped with marine elevators. An oil terminal at The Dalles is
under construction by the city, consisting of a timber wharf, 27 by
193 feet, on crib and reinforced concrete foundations. Storage tanks
have been constructed near this terminal by private interests, with a
total capacity of 1,334,000 gallons.
   Operations and results during fiscal year.-The canal was in serv-
ice throughout the fiscal year except for closure due to ice condi-
tions between January 7, and February 22, 1937; and closure on
December 5th for minor repairs to lock gate valve.
1540       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Seasonal dredging in the canal by Government plant and hired
labor during the year resulted in the removal of 35,302 cubic yards
of sand at a cost of $8,465.65.
Operation and care of locks and dams:
   Costs -----------------------------------------                                           $27, 968.42
   Expenditures.            ----------------------                     -----                  29, 940. 46
  Condition at end of fiscal year.-The canal, completed in 1919, is in
fair condition. The total cost under the existing project to June 30,
1937, was $4,736,490.56, of which $4,669,092.33 was for construction
of the canal and locks, $5,445.17 for maintenance, and $61,953.06 for
operating and care. The total expenditures were $4,738,439.97. In
addition, the sum of $525,267.16 was expended between May 5, 1915,
and June 30, 1935, on the operation and care of the works of improve-
ment under the provision of the permanent indefinite appropriation
for such purposes.
  Proposed operations.-The funds unexpended June 30, 1937,
$495.83, together with $45,000 allotted July 21, 1937, will be applied
as follows:
Accounts payable, June 30, 1937                                                                       60
                                                                                                 $_____________182.
Maintenance (operating and care) :
    Operation ------------ ----------------------                            $16, 000.00
    Ordinary repairs -------------------------------                           5, 000. 00
    Improvement and reconstruction ___               __            -_______- 15, 000. 00
    Channel work      ---------------------------------                        9, 000. 00
    Emergencies--- --       _-__         _____---                  __ --   _      313. 23
                                                                                               45, 313. 23

       Total for all work_ ..........        _____                 _______-           _        45, 495. 83
  The additional sum of $227,000 can be profitably expended during
the fiscal year 1939, as follows:
Maintenance (operating and care)•
    Operation                                                       200
                                                              $--------------------------
   Ordinary repairs -----------------------------------------    2, 000
    Improvement and reconstruction--..               -____-   201, 500
   Channel work--------------------                              8, 000
   Emergencies-----------------------------------------------       300
                       ---
       Total for all work               --------------------------------                         227, 000

                               Cost and financial summary

Cost of new work to June 30, 1937 -------------------------                               $4, 716, 205. 16
Cost of maintenance to June 30, 1937---------_______________                                 592, 665.39
      Total cost of permanent work to June 30, 1937----------- 5, 308, 870. 55
Undistributed costs June 30, 1937------------------------------     2, 093.80
      Net total cost to June 30, 1937-- ________________________ 5, 310, 964. 35
Plus accounts receivable June 30, 1937------__-__-              -__       38. 21
      Gross total costs to June 30, 1937____________________    5, 311, 002. 56
Minus accounts payable June 30, 1937--__         -____-_______-___      182.60
     Net total expenditures______----__    -_____ ______    __   5, 310, 819. 96
Unexpended balance June 30, 1937___  -----------------------------
                                          _________       _              457. 62
       Total amount appropriated to June 30, 1937----                                    5, 311, 277 58
  x Includes $525,267.16 for operating and care under the permanent            indefinite appropriation.
RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                                                                                1541

        Fiscal year ending June 30                              1933              1934              1935              1936         1937


Cost of new work-------
Cost of maintenance--
                                          -------------
                                                   $40,841.29
                                  .-------------------
                                                                        -----$94, 756.------------------------------------
                                                                                         12 $81, 608.95  $53, 080.03 $27, 968.42

Total expended.----------------------                       38,591.93         107,755.82         85,055.38         34,661.67      29,940.46
Allotted-   -----------------------------                  105,413. 78         64,113. 15        92, 445. 17       12,791.57       7,500. 00


Balance unexpended July 1, 1936----------------------------- $22,898. 08
Amount allotted from War Department Appropriation Act ap-
proved Apr. 26, 1934-------------------     -----------       7, 500. 00

      Amount to be accounted for       ---- ----------------- ---                                                              30, 398. 08
Gross amount expended----------------------------      $31, 881.74
Less:
    Reimbursements collected-------------- $1,915. 28
    Receipts from sales --------------------     26.00
                                                         1, 941.28
                                                                                                                               29, 940.46
      Balance unexpended June 30, 1937__----__----------------                                                                    457. 62
Outstanding liabilities June 30, 1937 ----------------------------                                                                457. 62

Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937---------------------------------------   45,000. 00
Accounts receivable June 30, 1937----------------------_ -----      38. 21

    Balance available for fiscal year 1938 -----------------                                                                   45, 038.21
Amount that:can be profitably expended in fiscal year ending June 30,
                                            - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   1939, for maintenance 2                                                                                                   227, 000. 00
  2 Exclusive of available funds.

5. COLUMBIA RIVER AND TRIBUTARIES ABOVE CELILO FALLS TO
        THE MOUTH OF SNAKE RIVER, OREG. AND WASH.

   Location.-This improvement includes the several rapids in the
123 miles between the head of Celilo Falls and the mouth of Snake
River. For general description of Columbia River see page 1487.
 (See U. S. Geological Survey Map of Washington.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of June 10, 1872, and modified by the River and
Harbor Act of March 2, 1907. The cost and expenditures under
this project were $494,610.90 for new work and $100,829.65 for main-
tenance, a total of $595,440.55, prior to the adoption of the existing
project in 1935. In addition, $25,000 was expended from con-
tributed funds for new work. For further details of previous proj-
ects see page 1992 of Annual Report for 1915, and page 1889, Annual
Report for 1931.
   Existing project.-This provides for a channel 7 feet deep and 150
feet wide at low water from Celilo Falls to Wallula, with no specified
width or depth between Wallula and the mouth of the Snake. The
section included in the project is 123 miles long. The lower end of
the project is about 200 miles from the mouth of the river. The
summer freshets occur from May to August and the ordinary
freshets reach a stage of 21 feet at Umatilla gage. The highest
flood (1894) reached a stage of 341/ feet at Umatilla. Freshets due
to rains usually occur in the early winter but rarely exceed a 9-foot
1542    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

stage. Ice conditions usually occur in January or February and
often suspend navigation for several weeks.
   The estimate of cost for new work, revised in 1937, is $1,475,000, ex-
clusive of amount expended on previous projects. The latest (1935)
approved estimate for annual cost of maintenance is $50,000.
   The existing project was authorized under the provisions of the
Emergency Relief Appropriation Act of 1935 and was adopted by
the River and Harbor Act approved August 30, 1935 (Rivers and
Harbors Committee Doc. No. 16, 73d Cong., 2d sess.). The latest
published map is contained in the project document.
   Terminal facilities.-There are no wharves on this stretch of river
nor any large warehouses on the river banks. At Umatilla Landing
there is a small portable warehouse. There is a railroad on each
bank of the river but there is no physical connection between the rail-
roads and the river.
   The existing facilities are considered sufficient for the needs of the
present commerce.
   Operations and results during fiscal year-Regular funds.-Con-
tract was awarded on July 7 for construction of a channel 150 feet
wide and 7 feet deep at low water between mile 66 and mile 85, the
head of Devils Bend Rapids. Work was begun under this contract on
October 13, 1936, and continued throughout the fiscal year. During
this period 12,375 cubic yards of rock were blasted in the channel
through Devils Bend Rapids. Completion of the work under this
contract will provide a channel 150 feet wide and 7 feet deep as far as
Umatilla Rapids, hear Umatilla, Oreg. (mile 90). The costs, includ-
ing Government costs on contract work financed from emergency
funds, were $136,910.90. The expenditures were $123,303.51.
   Emergency Relief funds.-Work was continued during the fiscal
year under the contract awarded in August 1935 for dredging a chan-
nel 150 feet wide and 7 feet deep at low water between Celilo Falls
and Wallula, Wash. The work under this contract extends to mile
66 above Celilo Falls and was begun October 9, 1935. During the
fiscal year 22,087 cubic yards of rock and 29,232 cubic yards of gravel
were removed from shoals in the 66-mile stretch. Work was sus-
pended between January 5 and March 4, 1937, inclusive, due to ice
conditions. The costs were $251,477.64 for new work. The expendi-
tures were $237,086.47.
   Condition at end of fiscal year.-The existing project is about 40
percent complete. As a result of the work under the two contracts
the 7-foot channel, 150-foot width, has been completed as far as
Canoe Encampment Rapids (mile 63 above Celilo) except for some
rock excavation still remaining to be done in Canoe Encampment and
Squally Hook Rapids. The controlling depth over the shoals be-
tween Celilo Falls and the mouth of the Snake River is about 4 feet,
through Homly Rapids (mile 117), where the width is only 70 feet.
Channels through other rapids in the stretch with the completion of
existing contracts will be 150 feet in width except in Umatilla Rapids.
Channels in the pools between rapids are from 400 to 1,500 feet wide.
There has been no regular navigation on this stretch of Columbia
River during the fiscal year except by survey boats and contractor's
plant.
   The total costs under the existing project from regular funds were
 $136,910.87; the total expenditures were $123,303.51, all for new work.
RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                                                               1543
   The total costs of the work done under emergency funds to the end
of the fiscal year amounted to $353,393.84; total expenditures were
$330,321.05.
   The total costs, all funds, were $490,304.71 for new work. The total
expenditures were $453,624.56.
  Proposed operations.-The funds unexpended June 30, 1937, from
emergency funds (Emergency Relief appropriation), $69,678.95, and
from regular funds (maintenance and improvement), $214,696.49,
together with $87,000 regular funds allotted July 21 1937, will be
applied as follows:
               A.    EMERGENCY FUNDS            (EMERGENCY RELIEF APPROPRIATION)

Accounts payable June 30,              1.937_    ----------------                      ------               $23, 072. 79
New work: Rock removal and dredging to provide a channel 7 feet
  deep and 150 feet wide from Celilo Falls to mile 66 above Celilo
  Falls, by continuation of existing contract, July 1937 to October
  1938                                 -   --      --                                                        46, 606. 16
       Total-------------------------------------------------                                                69, 678.95
                    B.   REGULAR   FUNDS     (MAINTENANCE            AND IMPROVEMENT)

Accounts payable, June 30, 1937------___-------------------------    $13,617. 39
New work : Rock removal and dredging to provide a channel 7 feet
  deep and 150 feet wide from mile 66 to mile 85 above Celilo Falls,
  by continuation of existing contract, July 1937 to July 1938-____ 238, 089. 10
       Total--             ____-_-_-________________---_                                         --         251,696.49
Maintenance :
   Channel surveys of Homly, Umatilla, Four O'Clock, and Biggs
      Rapids; establishment of gages and bench marks; and taking
      of water stage profiles, by hired labor, August 1937 to April
      1938...                                      _       _-----------------                                23, 500. 00
    Gravel and boulder removal, Celilo Falls to Wallula, by hired
      labor, September 1937 to April 1938 ---                                                   ____         14, 500. 00
Balance remaining ---------------------------------------------                                              12, 000. 00
      Total for all work, regular funds_                                                        _--------   301, 696. 49
  No further open river improvement above the head of Umatilla
Rapids, mile 93.2 above Celilo Falls, is contemplated at this time.
  The additional sum of $300,000 can be profitably expended dur-
ing the fiscal year 1939 between Celilo Falls and Wallula, as follows:
New work: Rock removal and dredging, to complete the project
  channel to 6-foot depth through Umatilla Rapids, mile 85 to mile
93.2 above Celilo Falls, by contract, July 1938 to April 1939_    $250, 000                          -____
Maintenance: Dredging and raking bars, Celilo Falls to Wallula, by
hired labor September 1938 to April 1939               -       __   50, 000
      Total for all work---------------------
                                       ___                                                                     300, 000

                                   Cost and financial summary
                            MAINTENANCE         AND IMPROVEMENT                  FUNDS

Cost of new work to June 30, 1937 ---------------------------- $631, 521. 80
Cost of maintenance to June 30, 1937-------------------------- 100, 829. 65
      Total cost of permanent work to June 30, 1937                                  -----------            732, 351. 45
Minus accounts payable June 30, 1937 --                                 ----------                           13, 607. 39
      Net total expenditures_                          --------------                                       718, 744. 06
Unexpended balance June 30, 1937--                                                                          214, 696. 49
Total amount appropriated to June 30, 1937--     ....    ----                                          -    933, 440. 55
1 Excluding $25,000 contributed funds expended for new work.
1544          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


        Fiscal year ending June 30                        1933                1934         1935             1936            1937


Cost of new work---------------------------------- ------------ ---                          ------------               $136,910.90
Cost ofmaintenance-......--.....-----------------                      ----------      $3,--------40.55
                                                                                       $3,940.55-------------
Total expended-----.............---------------- ----------------------                  3,940.55                        123,303.51
Allotted...--------------                      ------------------------                  3,940.55        $250, 000        88, 000. 00


Balance unexpended July 1, 1936_                               $250, 000.00
Amount allotted from War Department Appropriation Act approved
  May 15, 1936-----------------------------------------------    88, 000. 00

      Amount to be accounted for-------------------------------338,     000. 00
Gross amount expended___--- -----         __ ___-__$124, 840.21
Less reimbursements collected----------------------      1,536. 70
                                                                   123, 303. 51

    Balance unexpended June 30, 1937-----------------------                                                        214, 696. 49
Amount covered by uncompleted contracts _____________---_--                                                        214, 696. 49

Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--------------- --------------------------                                                        87, 000. 00
Balance available for fiscal year 1938----------------------------                                                     87, 000. 00

Amount (estimated) required to be appropriated for completion of
existing project 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 660, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939:
    For new work a________ _____ -                      ________ -             __ _______             _ 250, 000. 00
    For maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 50, 000. 00
                  -- --- --- -- --- ---        - --      --    - -- --- -- -- -- --- -- -- --- -- ---
        Total                                                                                                      300, 000. 00
                                             EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1937 ---------                                                                       $353, 393. 84
                                                                                                            _------------------
Cost of maintenance to June 30, 1937 .---
      Total cost of permanent work to June 30, 1937---------                                                         353, 393. 84
Minus accounts payable June 30, 1937----------------------------                                                      23, 072. 79

     Net total expenditures--_______---------- ----------                                              ____          330, 321. 05
Unexpended balance June 30, 1937 ------- ------------------                                              __           69, 678. 95

         Total amount appropriated to June 30, 1937----------                                                -__ 400, 000. 00

         Fiscal year ending June 30                       1933                1934         1935             1936            1937

Cost of new work--..........------------------------.-.....                  ---                $101, 916. 20            $251, 477. 64
Cost ofmaintenance              ---------- -----------               -------------------------------------              -----------
Total expended..          .......---------     .------------     --------------       ----------         93, 234. 58      237, 086. 47

Allotted................-------------            ------------------                  --------- 400,000.00----------


Balance unexpended July 1, 1936                                                                _            $306, 765. 42
                                                                                                     --_------------------
Gross amount expended_____-------------------------                                        $283, 214. 08
Less reimbursements collected                                                                     46, 127. 61
                                                                                                                   237, 086.47

         Balance unexpended June 30, 1937                                                                              69, 678. 95
Amount covered by uncompleted contracts-......                                             -_.___-                     69, 678.95
2Exclusive of available funds.
 RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                                                                               1545
CONSOLIDATED COST AND FINANCIAL SUMMARY FOR COLUMBIA RIVER AND TRIBUTARIES

Cost of new work to June 30, 1937__________________-------------------------- $984, 915. 64
Cost of maintenance to June 30, 1937------------------------100,                    829.:65
     Total cost of permanent work to June 30, 1937----------                                                            1, 085, 745. 29
Minus accounts payable June 30, 1937----------------------                                                                  36, 680.18

     Net total expenditures_________---------------                                                                     1, 049, 065.11
Unexpended balance June 30, 1937__-- -------------------                                                                   284, 375.44

            Total amount appropriated to June 30, 1937__                                                  ________      1,333, 440.55

           Fiscal year ending June 30                               1933            1934           1935              1936          1937

Cost of new work-------------..............---------....----------..........------------......     -----       $101, 916. 20    $388, 388. 54
Cost of maintenance----- ---------------- ----------- ------------                               $3, 940. 55 .
Total expended          -----------------------------------------                                 3,940.55      93, 234. 58      360, 389. 98
Allotted--- -------------------------------------------------                                     3,940. 55    650,000.00         88,000. 00


Balance unexpended July 1, 1936 -------                        $556, 765. 42
Amount allotted from War Department Appropriation Act approved
  May 15, 1936------     ------------------------------          88, 000. 00

      Amount to be accounted for____                                                                                        6__________________
                                                                                                                            644, 765. 42
Gross amount expended ________--  __________                                                        $408, 054. 29
Less reimbursements collected__-----_----------                                                      47, 664. 31
                                                                                                                            360, 389. 98

     Balance unexpended June 30, 1937__--------------------                                                                 284, 375. 44
Amount covered by uncompleted contracts --------------------                                                                284, 375. 44

Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937-----------------------------------87,                                                                     000. 00
Balance available for fiscal year 1938-----------------------                                                                  87, 000. 00
Amount (estimated) required to be appropriated for completion of
existing project 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -
                                                                                                 660, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
   For new work 2_________________                                                               250, 000. 00
   For maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 50, 000. 00
                               - - - -- - -- - -- - - -- - -- - -- -- - -- - -- - -- - -- - -- -- - -- -
            Total                                                                        _                                  300, 000. 00
    1 Excluding $25,000 contributed funds expended for new work.
    2 Exclusive of available funds.


                         6. SNAKE RIVER, OREG., WASH., AND IDAHO

  Location.-The Snake River is the largest tributary of Columbia
River, and rises in Yellowstone National Park, in the western part
of Wyoming, flows in a general westerly direction for about 1,000
miles and empties into Columbia River near Pasco, Wash., 324 miles
from the Pacific Ocean. (See U. S. Geological Survey Maps of
Oregon, Washington, and Idaho.)
  Previous projects.-No formal project for the improvement of
Snake River was adopted by Congress prior to the act of June 13,
1902. The cost and expenditures previous to the adoption of the
existing project in 1907 were $168,500, of which $153,410.26 was for
new work and $15,089.74 for maintenance. For further details of
previous projects see page 1991 of Annual Report for 1915.
1546     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for general open-river improve-
ment by blasting rock reefs, dredging and raking gravel bars, and by
construction of contraction works between the mouth and Johnsons
Bar, a distance of 232 miles, with a view to securing a depth of 5 feet
at low water in the existing channels from the mouth to Riparia;
thence a channel of the same depth and generally 60 feet wide to
Lewiston? Idaho; and for removing boulders and rock points and
constructing contraction works between Lewiston and Johnsons Bar.
No channel dimensions are specified above Lewiston.
   The estimate of cost for new work, revised in 1937, is $327,500,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $10,500.
   The existing project was adopted by the following river and har-
bor acts: The act of June 13, 1902, provided for the sections from
Riparia to Lewiston (H. Doc. No. 127, 56th Cong., 2d sess.), and
Lewiston to Pittsburg Landing (see Annual Reports for 1903, p. 2246,
and 1906, p. 1986); the act of June 25, 1910, provided for the section
from the mouth to Riparia (H. Doc. No. 411, 55th Cong., 2d sess.);
the act of August 30, 1935, provided for the section from Pittsburg
Landing to Johnsons Bar (Rivers and Harbors Committee Doc. No.
25, 72d Cong., 1st sess.). The latest published map is in the last-
mentioned document.
   Local cooperation.-No conditions were imposed by law. The
Washington State Legislature in 1907 provided $85,000, which was
expended by the Federal Government between Riparia, Wash., and
the mouth for general open-river work in accordance with the
adopted project.
   Terminal facilities.-From the mouth to Riparia, 67 miles, there
are no wharves or warehouses on the river banks. From Riparia to
Lewiston, 72 miles, there are no wharves, but on the left bank, there
are several wheat warehouses for storage of wheat to be transferred
to the railroad on the right bank. There is no railroad on the left
bank above Riparia so that the wheat has to be transferred by river
steamers to the railroad on the right bank. Lewiston, a city of
9,403, 139 miles above the mouth, owns 4,000 feet of water frontage
on the Snake River and has leased 250 feet to a warehouse company
which operates a warehouse located on the bank of the river, but no
part of the structure extends to the low-water line and the boats land
on the beach. Asotin, a town with population of 697, 6 miles aboye
Lewiston, has three warehouses on the river bank, but no wharves.
Above Asotin there are two wheat warehouses, the farthest 11 miles
above.
   The existing facilities are believed to be sufficient for the present
commerce.
   Operations and results during fiscal year.-Work was carried on
by Government plant and hired labor between July 1, 1936, and Jan-
uary 6, 1937, in the stretches of Snake River between Lewiston and
Johnsons Bar. This work consisted of the removal of rocks and pin-
nacles in the navigation channel and repair of the contraction dike
at Slaughter House Rapids near Lewiston, Idaho. During the sea-
son 1,977 cubic yards of rock were blasted from the channel and
RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT              1547

1,542 cubic yards of material placed in the dike. The cost of the
work was $12,745.05 for rock removal and $4,075.88 for dike repair.
The total expenditures were $17,278.66.
   Condition at end of fiscal year.-The existing project is 85 percent
completed. A new survey was made. in 1934-35. The controlling
depth, at mean low water, on the shoals between the mouth of the
river and Riparia (67- miles) is 0.4 foot at one point (Haunted House
Rapids, 42 miles above the mouth); between Riparia and Lewiston
 (72 miles), 0.9 foot at one point (Log Cabin Rapids, 107 miles above
the mouth); between Lewiston and Pittsburg Landing (76 miles),
about 2.7 feet; from Pittsburg Landing to Johnsons Bar (14 miles),
about 2.8 feet. The adopted low-water plane is the lowest 15-day
period (-0.3 on Lewiston gage). The channels below Lewiston are
from 150 to 700 feet wide in the pools and from 30 to 150 feet wide
through the rapids. Above Lewiston the channels are, at mean low
water, from 30 to 100 feet wide. From the mouth to Riparia, on
account of the crooked channels through the rapids, commercial
navigation has been limited to stages above 3 feet on Lewiston gage,
which permits a 4-foot draft to Lewiston. This gives a navigation
season of about 150 days (from February to August). Extreme low
water occurs from July to October. A second navigation stage
usually occurs during the fall and winter months, but the commer-
cial boats when operating, did not take advantage of a boating stage
during those months and usually suspended operations in July.
Between Riparia and a point about 12 miles above Lewiston naviga-
tion is usually continuous, except during extreme low water, which,
however, does not occur every year. Above the Grande Ronde River
 (30 miles above Lewiston) navigation has not been possible at low
stages. As a result of the channel work performed during this fiscal
year, navigation, by the high-powered launches which operate above
Lewiston as far as Johnsons Bar, has been possible at about a 1-foot
stage on the gage at Lewiston. Navigation during the past 10 years
has been limited to the operation of one steamboat, used for trans-
ferring wheat, and the operation of one or two gasoline boats during
favorable stages of river from Lewiston to Johnsons Bar, a distance
of about 90 miles. The work remaining to be done to complete the
project is the removal of dangerous rocks above Lewiston and the
widening and deepening of the existing channels to project dimen-
sions, which contemplate a depth of 5 feet from the mouth to Lewis-
ton, and removal of obstructions between Pittsburg Landing and
Johnsons Bar.
   The total cost of the existing project amounted to $334,557.17, of
which $166,873.19 is for new work and $167,683.98 for maintenance.
Total expenditures were $334,584.62. In addition $85,000 was ex-
pended on new work from contributed funds.
   Proposed operations.-The funds unexpended June 30, 1937, $108.29,
together with $5,000 allotted July 21, 1937, will be applied to main-
tenance work consisting of the raking of gravel bars, removing
boulders and repairing dikes, by hired labor from July to December
1937.
   The additional sum of $75,000 can be profitably expended during
the fiscal year 1939 for new work and for the removal of shoal areas
1548            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

which have formed since the last maintenance work was done in 1924,
as follows:
New work: Removal of rock ridges and gravel and boulder bars in the
  channel between Lewiston (mile 139) and Johnsons Bar (mile 232)
  by hired labor, July 1939 to December 1939
Maintenance: Raking gravel bars, removing boulders, repairing dikes to
                                                                            ----------------------
                                                                       $10,000
  eliminate shoal areas by hired labor, July 1939 to December 199    _ 65,000
          Total for all work.. --------------------------------------
                                    ..                                                                                75, 000
                                            Cost and financial summary
Cost of new work to June 30, 1937--------------------------                                                     $320,283. 45
Cost of maintenance to June 30, 1937--------------------------                                                    82, 773. 72
      Total cost of permanent work to June 30, 1937-----------                                             - 503, 057.17
Plus accounts receivable June 30, 1937--------------------                                                             27. 45
           Gross total costs to June 30, 1937-----------------------                                            503, 084. 62

Net total expenditures-------------------   ------------------                                                   503, 084. 62
Unexpended balance June 30, 1937 -______-_-----___________                                                             80. 84

           Total amount appropriated to June 30, 1937____-                                      -____-_ 503, 165. 46

          Fiscal year ending June 30                            1933       1934          1935          1936            1937

Cost    maintenance
Cost of new work------------------------------------------------------------$570.78
                    ........................................................... $570 78                         $16,820.93
                                                                                                                $16, 820.93
Cost of maintenance--..........------------------         ------------ ------------ ------------ ------------------------
Total expended-------...----------------------------------------------                                  140 50        17, 278.66
Allotted......--------------------                  ---.-----------        ------------------ --    17, 500. 00.



Balance unexpended July 1, 1936----------------------------                                                     $17, 359.50
Gross amount expended______----------- -------                                              $17,669.63
Less reimbursements collected--------------------                                               390.97
                                                                                                                   17, 278.66
Balance unexpended June 30, 1937--------------------------------                                                       80. 84
Outstanding liabilities June 30, 1937_______________ ____________ -                                                     4. 20
Balance available June 30, 1937----------------------------------                                                      76. 64
Accounts receivable June 30, 1937 ------ _______-________ -                                                            27. 45
     Unobligated balance available June 30, 1937-----------------                                                     104. 09
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937--    ----------------------------------                                                       5, 000. 00
           Balance available for fiscal year 1938 __                              _________________                 5, 104. 09
Amount (estimated)                  required to be appropriated for completion of
                                          -- - -- - -- -- - - -- - -- - -- - - -- - --
existing project 2                                                                                                75, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
                    -- - -- - -- - -- - - -- - -- - - -- - -- - - -- - -- - -- - -- - -
   For new work 2                                                                            10, 000. 00
   For maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 75, 000. 00
                         - -- -- --- -- -- - - - - - - - - - - - - - -       - - -- - -- - - -- - -- - -- - -
           Total                                                                                                   75, 000. 00
      xcluding of$85,000
   '2EExclusive          contributed funds expended for new work.
                   available funds.

     7. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year amounted to $66,030.64; the ex-
penditures were $66,825.07. The funds unexpended and accounts
 RIVERS AND HARBORS-SECOND PORTLAND, OREG., DISTRICT                                                                       1549
receivable June 30, 1937, $1,971.50, together with $25,000 allotted
during July 1937, will be applied as needed during the fiscal year
1938 to the payment of expenses to be incurred under this heading.
The additional sum of $25,000 can be profitably expended during the
fiscal year 1939.
                                               Cost and financial summary
Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937------------------------                                                    $400, 886. 93

       Total cost of permanent work to June 30, 1937---_------                                                   400, 886. 93
Plus accounts receivable June 30, 1937 ----------------------                                                         197. 31

     Gross total costs to June 30, 1937__----------                                  ------------               401, 084. 24
Minus accounts payable June 30, 1937                                                                                 789. 60

     Net total expenditures-------------------------                                                            400, 294. 64
Unexpended balance June 30, 1937------------------   ___--                                                        1, 774. 19

           Total amount appropriated to June 30, 1937 ----------                                                402, 068. 83

          Fiscal year ending June 30                         1933         1934         1935              1936             1937

Cost of new work-----------------------------_------------------                              ----       ----------------
Cost of maintenance---------------                        ----------- $11, 786.55 $218, 086.02       $104, 983.72       $66,030.64

Total expended-----------.--                    ------- ------------ 11, 786. 55    207, 257.62       114, 425. 40       66, 825. 07
Allotted...              ...--------------------------   ------------ 11, 786. 55   246, 782.28       108, 000. 00       35, 500. 00


Balance unexpended July 1, 1936_-__---------------------                                                         $33, 099. 26
Amount allotted from War Department Appropriation
  Act approved Apr. 9, 1935_----------------------- $5, 500. 00
Amount allotted from War Department Appropriation
Act approved May 15, 1936 ______   _______--------30, 000. 00
                                                                                                                     35, 500. 00
      Amount to be accounted for_______________-------------                                                         68, 599. 26
Gross amount expended____------------__------                $74, 237. 41
Less reimbursements collected__------ --   __--------          7, 412. 34
                                                                                                                     66,825.07
      Balance unexpended June 30, 1937 ----------------------                                                         1, 774. 19
Outstanding liabilities June 30, 1937___________
                                        -__-__-_____-                                                                 1, 774. 19
Amount allotted from War Department Civil Appropriation Act
  approved July 19, 1937-------_______      ------------        _                                                    25, 000.00
Accounts receivable June 30, 1937 ___--------              ____
                                                 -------------                                                           197. 31
      Balance available for fiscal year 1938___-------                  _____                                        25,197.31
Amount that can be profitably expended in fiscal year ending June
                                 -- -     - - -- - -- - -- -- - - - - -
30, 1939, for maintenance 1___ __ ___                    -              _    _                                      25, 00. 00
1 Exclusive of available funds.

8. PLANT ALLOTMENT FOR                                    SECOND PORTLAND                     (OREG.)           DISTRICT
                                              Cost and financial summary
Undistributed costs June 30, 1937______----______-----------_    $61, 834. 42
Plus accounts receivable June 30, 1937--------------------------   3, 253. 46
      Gross total costs to June 30, 1937                                                                              5, 087. 88
                                                                                                                     6-----------------------
Minus accounts payable June 30, 1937-------------------------                                                        10, 284. 36
     Net total expenditures_ _---------------------            54, 803. 52
Unexpended balance June 30, 1937 --     ---------------------- 16, 378. 90
     Total amount appropriated to June 30, 1937---             71, 182. 42
1550         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30                1933        1934         1935               1936            1937


Total expended....-----------------------------            -----------   $14, 582. 97    $42, 034.99        -$1, 814. 44

Allotted ......------------------     ------------------------------      16, 246.03      49, 936. 39          5, 000. 00



Balance unexpended July 1, 1936_______________________                               -______            $9, 564,46
Amount allotted from War Department Appropriation Act approved
   Apr. 26, 1934___----------------------------------                          ------                       5, 000.00
      Amount to be accounted for_____________________      __                                           14; 564. 46
Gross amount expended------------------------------ $73, 429.92
Less reimbursements collected ______________________                                 75, 244. 36
                                                                                                      -1,     814. 44
         Balance unexpended June 30, 1937__                       _________________-                    16, 378. 90
Outstanding liabilities June 30, 1937______________---
                                              -                                 --       _              10, 294. 15
      Balance available June 30, 1937----      -----------                                                  6,084. 75
Accounts receivable June 30, 1937__________________ _________                                               3, 253. 46
         Unobligated balance available June 30, 1937                                                        9, 338. 21

                     9. UMATILLA RIVER, OREG., FLOOD CONTROL
   Location.-At Pendleton, Oreg., 50 miles above the mouth of the
river.
   Existing project.-The improvement contemplated is channel rec-
tification and levee enlargement and extension in Umatilla River,
and was authorized by the Flood Control Act approved June 22,
1936. The estimated cost, given in the Flood Control Act, 1936, is
$200,000. The revised (1937) construction cost is $220,000.
   Local cooperation.-See page 6.
  Condition at end of fiscal year.-Work has not been started.
  Proposed operations.-Allotments of $190,000 from regular funds,
and $30,000 from emergency funds, received August 9, 1937, will be
applied as follows:
New work:
   Rehabilitation and extension of existing levee, by contract, August
       1937 to January 1938_                                             $190, 000
      Rehabilitation and extension of existing levee revetment, by hired
       labor, August 1937 to January 1938-__       -------------------
                                                   __--                    30, 000
            Total ....-                  ______ ____          _                                              220, 000
  Operation and maintenance of this project upon completion will be
assumed by the city of Pendleton, Oreg., under the provisions of the
Flood Control Act of June 22, 1936. Therefore, no additional funds
will be required for the fiscal year 1939.
    Status of reports called ,for by river and harbor acts and committee resolutions

        Locality              Authorization act        Transmitted                                    Recommenda-
                                                       to Congress        Document no.                Recommenda-


Columbia River, at and      River and Harbor Act, _
in the vicinity of           Aug. 26, 1937.
  Camas, Wash.
Columbia River at town      Senate committee res-
of Hood River, Oreg.         olution, Dec. 3, 1935.
Columbia River, Wash,       Senate committee res-
  and Oreg., in vioinity      olution,   Aug.    21,
  of The Dalles.              1935.
Columbia     River    be-   Senate committee res- June 21, 1937 _____________                         Unfavorable.
  tween Vancouver,            olution,    Feb.   19,
  Wash., and Bonne-           1937.
  Yille, Oreg., bridges.
                 RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                   1551
       Status of reports called for by river and harbor acts and committee
                               resolutions-Continued

         Locality              Authorization act            Transmittgress           Document no.       Recommenda-
                                                             to Congress                                    tion

Crooked River, Oreg.. -   Flood Control Act,
                             June 13, 1934.
Deschutes
Deschutes River,
          River, Greg--
                 Oreg _.....   do-------------------
                         ----- do                                       ----------     ---------
Salmon
Salmon
          River, Oreg. - -- do .-----
          River, Oreg...... doy   .-
                                                                 -------------
                                                               ---------
  (preliminary examina-:
tion for flood control).
Snhke River, Wash. and       Senate committee res-
  Idaho, up to Lewiston.       olution,      June     10,
                               1936.
Snake River, and tribu-      Flood Control           Act,
  taries, Idaho, Wash.         Mar. 4, 1937.
  and Oreg. (prelimi-
  nary examination and
  survey for flood con-
  trol).
Umatilla River,     Oreg.    Flood    Control        Act,   June 10,1937         -      _ _         -   Unfavorable.
  (prelimitary examina-       June 13, 1934.
  tion for flood control).
Walla Walla River, and
  tributaries,   Orego n
                                 do       ___.                -----------              ----------
  and Washington (pre-
  liminary examination
  for flood control).
Walla Walla River and        Flood Control           Act,           -
tributaries, Washing-         May 6, 1936.
ton (preliminary ex-
amination for flood
control).
Willow Creek and trib-       Flood Control           Act,   Dec. 11, 1936        House, 97, 75th Con-   Favorable.
utaries, Oregon (pre-        June 13, 1934.                                      gress, 1st sess.
liminary examination
for flood control).


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
            SEATTLE, WASH., DISTRICT
   This district includes the States of Washington and Idaho except
the basins of Snake River and Columbia River below the mouth of
the Snake; also that part of Montana west of the Rocky Mountains,
and Alaska.
  District engineer: Lt. Col. H. J. Wild, Corps of Engineers.
  Division engineer: Col. Thomas M. Robins, Corps of Engineers.
                                                     IMPROVEMENT

                                                       Page                                                      Page
1. Willapa River and Harbor,                                   14.     Anacortes Harbor, Wash_ -_              1579
      Wash _                                           1552     15.     Bellingham Harbor, Wash__               1580
2. Grays Harbor and Chehalis                                   16.     Ketchikan Harbor, Alaska__              1582
      River, Wash_                                     1555     17.     Dry Pass, Alaska                -       1583
3. Quillayute River, Wash ..-                         1560     18.     Wrangell Harbor, Alaska __              1583
4. Puget Sound and its tribu-                                  19.     Stikine River, Alaska ..-...            1584
      tary waters, Wash ......                         1561     20.     Wrangell Narrows, Alaska__              1586
5. Waterway connecting Port                                    21.     Petersburg Harbor, Alaska__             1587
      Townsend Bay and Oak                                      22.     Sitka Harbor, Alaska _....              1588
      Bay, Wash_                                       1563     23.     Juneau Harbor, Alaska ....              1590
6. Port Gamble Harbor, Wash_                          1564     24.     Cordova Harbor, Alaska ...              1591
7. Hammersley Inlet, Wash
8. Olympia Harbor, Wash ....
                                                 -     1565
                                                       1566
                                                                25.     Harbor of refuge, Seward,
                                                                  Alaska _ _ _                      1592
9. Tacoma Harbor, Wash ....                           1568 26. Egegik River, Alaska ......         1593
10. Seattle Harbor, Wash _...                          1570 27. Nome Harbor, Alaska .....           1594
11. Lake Washington Ship Canal,                             28. Examinations, surveys, and
         Wash _-                _ __ _                 1573       contingencies (general) - -       1597
12. Everett Harbor and Snoho-                               29. Other projects for which no
      mish River, Wash ______                          1576       estimates are submitted __ 1598
13. Swinomish Slough, Wash __                          1578 30. Plant allotment __            -___- 1598

         20196-37-pt. 1--98
1552     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                 FLOOD CONTROL

                                   Page                                Page
31. Puyallup River, Wash------    1599 34. Lowell Creek, Alaska------- 1602
32. Stillaguamish River, Wash_    1600 35. Salmon River, Alaska----- -1604
33. Skagit River, Wash--------    1601

               1. WILLAPA RIVER AND HARBOR, WASH.

    Location.-Willapa Harbor consists of the lower reaches of Wil-
lapa River and Willapa Bay, an inlet of the Pacific Ocean located
about 30 miles north of the mouth of Columbia River. Willapa River
rises in the State of Washington, about 30 miles east of the harbor,
flows in a general westerly direction, and empties into the bay. (See
U. S. Coast and Geodetic Survey Chart No. 6185.)
    Previous projects.-Adopted by the River and Harbor Act of July
13, 1892, and modified by the River and Harbor Acts of August 18,
1894, March 3, 1899, June 13, 1902, March 2, 1907, and June 25, 1910.
    The cost and expenditures on original and modified projects prior
to the adoption of the existing project in 1916 were $228,083.83 for
new work and $7,176.62 for maintenance, a total of $235,260.45.
Contributed funds for new work amounted to $6,596.92. For further
details of previous projects adopted prior to June 25, 1910, see page
2001 of Annual Report for 1915.
    Existing project.-This provides for a channel over the bar at the
mouth of Willapa Bay, 26 feet deep at mean lower low water, with a
minimum width of 500 feet; for straightening the river channel at
the Narrows about a mile downstream from Raymond by a cut-off
channel 200 feet wide, 24 feet deep, and about 3,100 feet long; and
for a channel 24 feet deep and 200 feet wide from deep water in
Willapa Bay to the forks of the river at Raymond, 24 feet deep and
150 feet wide up the South Fork as far as the deep basin above the
Cram lumber mill, and up the North Fork to a point opposite Twelfth
Street, with a turning basin 250 feet wide, 350 feet long, and 24 feet
deep at the latter point and a closing dike at Mailboat Slough. The
length of the section included in the project is 26 miles. The extreme
tidal range at Willapa Bay entrance is 13.6 feet. The range between
mean lower low water and mean higher high water is 8.1 feet at the
entrance and 9.8 feet at South Bend.
   The estimate of cost for new work, revised in 1935, was $800,732,
exclusive of amounts expended on previous projects but including
$71,775 contributed by local interests. The latest (1934) approved
estimate for annual cost of maintenance is $135,000, including $5,000
annually for the first 4 years of the cut-off channel at the Narrows.
The river channels were authorized by the River and Harbor Act of
July 27, 1916 (H. Doc. No. 706, 63d Cong., 2d sess.).
   The maintenance of the channel over the bar at a depth of 26 feet
and minimum width of 500 feet was authorized by the Public Works
Administration December 11, 1933, and by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 41, 72d
Cong., 1st sess.). The cut-off channel at the Narrows was authorized
May 28, 1935, under the Emergency Relief Appropriation Act of 1935
and by the River and Harbor Act of August 30, 1935 (Rivers and
Harbors Committee Doc. No. 37, 73d Cong., 2d sess.). Prior to
adoption by the River and Harbor Act of August 30, 1935, the main-
tenance of the bar channel, Willapa Bay, to 26-foot depth was
               RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                       1553

authorized December 11, 1933, by the Public Works Administration.
The latest published maps are in the latter document and in Rivers
and Harbors Committee Document No. 41, Seventy-second Congress,
first session.
   Local cooperation.--Fully complied with.
   Terminal facilities.-There are five sawmill wharves, two city
wharves, one port wharf, one railway wharf, and two oil wharves on
Willapa River. The city, port, and railway wharves are open to
general public use. The facilities are considered adequate for exist-
ing commerce.
   Operations and results during fiscal year.-Under regular appro-
priations, maintenance dredging in the bar channel was continued
intermittently by the U. S. dredges Mackenzie and Michie, a total of
7 dredge-months, removing 2,175,502 cubic yards, and the U. S. dredge
Kingman removed 130,778 cubic yards from the lower portion of the
river channel in October 1936. Surveys of the bar channel were made
in July, August, September, and October 1936, and June 1937, and
of the river channels in October 1936, and May 1937. The total costs
were $193,822.32, all for maintenance. The expenditures were $201,-
850.35. The costs and expenditures from emergency relief funds were
$0.02 for overhead and charged to new work.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1936 at a saving of $14,686 under the estimated cost. The
dikes constructed under previous projects are in good condition. A
survey completed June 15, 1937, showed a controlling depth of 25 feet
over width of 200 feet across the bar.
    The controlling depth in the river channels in May 1937, was 22
feet below Raymond, 21 feet in the North Fork, and 18 feet in the
South Fork, except in the upper portions of the forks where there
is no navigation at present and no recent soundings have been taken.
    The total costs on the existing project to June 30, 1937, have been
as follows:

                            United States funds                        New work           Maintenance            Total

Regular__....------------------------------....                   -$521,        957. 42    $800, 471. 10     $1, 322, 428. 52
                    ..................-------
Public Works---------                                                                          78, 533. 00        78, 533. 00
Emergency Relief--------------------------....             ----            192, 314. 06 ............--           192, 314. 06
      Total United States funds---........ -.-.--.-         --             714, 271.48     879, 004. 10       1, 593, 275. 58
Contributed funds--------------       __.     ---------
                                               -.....--                     71, 775.00 --------------             71, 775. 00
        Total all funds--.....-_-_.--------.----------.                    786, 046. 48      879, 004. 10     1, 665, 050. 58



   The total expenditures were $1,572,183.04, of which $1,301,335.98
were regular funds, $78,533 Public Works funds, and $192,314.06
Emergency Relief funds. In addition, $71,775 was expended from
contributed funds.
   Proposed operations.-The funds unexpended June 30, 1937, $36,-
521.70, together with allotments of $100,000 made during July 1937,
will be applied to maintenance, as follows:
Accounts payable June 30, 1937_____________________________       $23, 625.30
Operation of 1 seagoing hopper dredge on the bar channel, a total
   of about 4    months,
                 -/2     July 1 to Sept. 15, 1937, May and June
     1938 ------------------------                                                                           112, 896. 40
            Total ----------------------                                                                     136, 521. 70
1554          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The additional sum of $220,000 can be profitably expended during
the fiscal year 1939 for maintenance, as follows:
Operation of 1 seagoing hopper dredge on the bar channel, a total
  of about 5 months, July, August, and September 1938, and May
and June 1939----------------------------------------------- $130,000
Dredging of river channels, by contract, July to September 1938,-----. 90, 000
          Total----------------------------------------------------                                                      220,000
This amount will be necessary to maintain the channels in condition
to serve existing commerce.
                                      Cost and financial summary

Cost of new work to June 30, 1937__------------------------                                                12 $942, 355. 31
Cost of maintenance to June 30, 1937------------- -----------                                                  886, 180. 72
      Total cost of permanent work to June 30, 1937-.......                                                 1, 828, 536. 03
Undistributed costs June 30, 1937-------------------------                                                       2, 532. 76

     Net total cost to June 30, 1937---                                                                     1, 831, 068. 79
Minus accounts payable June 30, 1937                                                                            23, 625. 30

          Net total expenditures_                                                                     1231, 807, 443. 49
Unexpended balance June 30, 1937__ -                        -                  --                                  36, 521. 70'

         Total amount appropriated to June 30, 1937 -                                                 12    1, 843, 965. 19


        Fiscal year ending June 30-             1933               1934                1935            1936                1937


Cost of new work .____________                 ... ... .. -.. ... ...                 .. ..        $192,314.04                 $0.02
Cost of maintenance__                       $67, 575. 70 $152, 365. 13              $70, 713.23      93, 637.68          193, 822. 32
      Total cost___-------------------       67, 575. 70        152, 365. 13         70, 713.23     285, 951. 72         193, 822. 34
Total expended -_                            87, 248. 56        144, 898. 54         43, 413. 35    276, 997. 83         201, 850. 37

Allotted..---------------                    130, 142. 90       140, 707.03         245, 919.20     143, 957. 06         114, 757. 00


Balance unexpended July 1, 1936_________________________                                                      $123, 615. 07
Amount allotted from War Department Appropriation Act ap-
   proved May 15, 1936-_ _____---
                               __                      --       -___      -                                    115, 000. 00
      Amount to be accounted for__                                                                             238, 615. 07
Deductions on account of revocation of allotment _                                                                  243. 00
      Net amount to be accounted for_                                                                          238, 372.07
Gross amount expended-                                                    _ $210, 137. 77
Less reimbursements collected_                                                 8, 287.40
                                                                                                               201, 850. 37
      Balance unexpended June 30, 1937--                                                                           36,    521.    70
Outstanding liabilities June 30, 1937-                                                                             24, 960. 00
     Balance available June 30. 1937_                                                                              11, 561. 70
Amount allotted during July 1937__________                                                                     100, 000. 00

     Balance available for fiscal year 1938__                                                                  111, 561. 70
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 4__________________________                                                    220. 000.00
   1 Includes  $192,314.06 emergency relief funds.
   2 In addition $78,371.92 was expended from contributed funds.
   S Includes $78,533 Public Works funds.
   4 Exclusive of available funds.
        RIVERS AND HARBORS-SEATTLE,         WASH., DISTRICT      1555

         2. GRAYS HARBOR AND CHEHALIS         RIVER, WASH.

   Location.-Grays Harbor lies at the mouth of Chehalis River, in
the southwestern part of the State of Washington, 45 miles north of
the entrance to Columbia River. The inner portion comprises two
main channels, the south and the north, connecting the harbor
proper with the Chehalis River at Aberdeen. Chehalis River rises
in the southwestern part of the State of Washington, about 40 miles
east of the Pacific Ocean, flows in a general northwesterly direction,
and empties into the eastern part of Grays Harbor. (See U. S. Coast
and Geodetic Survey Chart No. 6195.)
   Previous projects.-The original project for the Chehalis River
was adopted by the River and Harbor Act of August 2, 1882. The
original project for the inner harbor was adopted by the River and
Harbor Act of July 13, 1892. The costs and expenditures on both
projects prior to the adoption of the existing project in 1907 and
1910 were $113,134.38 for new work and $37,415.45 for maintenance,
a total of $150,549.83. For further details see pages 2002-2003 of
Annual Report for 1915.
   Existing project.-This provides for an entrance channel across
the bar 600 feet wide and 30 feet deep, to be secured by a south
jetty 13,734 feet long and a north jetty 16,000 feet long, both at an
elevation of 16 feet above mean lower low water and by dredging;
for a channel 26 feet deep at mean lower low water from deep water
in Grays Harbor to the Union Pacific Railroad bridge across Che-
halis River at Aberdeen, a distance of 151/2 miles, 350 feet wide to
Grays Harbor City, thence 200 to 350 feet wide to the bridge; thence
18 feet deep and 200 feet wide to Cosmopolis, a distance of 3 miles,
and for a chanel 16 feet deep at mean lower low water and 150 feet
wide from Cosmopolis to Montesano, a distance of 103/4 miles. The
extreme tidal ranges are 14.4 feet on the bar and 18 feet in the
harbor. The ranges between mean lower low water and mean higher
high water are 9.1 feet on the bar and 9.9 feet in the harbor.
   The estimate of cost for new work, revised in 1935, is $3,229,000,
exclusive of amounts expended on previous projects, but inclusive
of $211,500 to be contributed by local interests. The latest (1935)
approved estimate for annual cost of maintenance dredging in the
section below Aberdeen is $270,000. Local interests are to maintain
the work above Aberdeen.
   The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for the south jetty
 (Annual Report for 1895, pp. 3517-3533); act of March 2, 1907,
provided for a north jetty 9,000 feet long (Rivers and Harbors Com-
mittee Doc. No. 2, 59th Cong., 2d sess.), and for the 18-foot channel
 (H. Doc. No. 507, 59th Cong., 1st sess.); act of June 25, 1910,
provided for extension of the north jetty 7,000 feet and fixed the
length of the south jetty at 13,734 feet (Rivers and Harbors Com-
mittee Doc. No. 29, 61st Cong., 2d sess.), and for a 6-foot channel
above Cosmopolis (H. Doc. No. 1125, 60th Cong., 2d sess.); act
of August 8, 1917 (H. Doc. No. 1729, 64th Cong., 2d sess.), and
January 21, 1927 (H. Doc. No. 582, 69th Cong., 2d sess.), provided
for dredging in the bar channel; act of July 3, 1930 (H. Doc.
1556    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

No. 315, 70th Cong., 1st sess.), provided for the 16-foot channel above
Cosmopolis; and the act of August 30, 1935, provided for reconstruc-
tion of the north and south jetties to an elevation of 16 feet above
mean lower low water (Rivers and Harbors Committee Doc. No. 2,
74th Cong., 1st sess.), for maintenance of the 26-foot channel below
Aberdeen as authorized by the Public Works Administration Decem-
ber 11, 1933, and for combining the projects for Grays Harbor and
bar entrance, Wash., and Grays Harbor, inner portion, and Chehalis
River, Wash., under a modified project for Grays Harbor and Che-
halis River (H. Doc. No. 53, 73d Cong., 1st sess., and Rivers and
Harbors Committee Doc. No. 2, 74th Cong., 1st sess.). The latest
published map is in House Document No. 53, Seventy-third Congress,
first session.
   Local cooperation.-The port of Grays Harbor contributed a total
of $32,496.12 for dredging in the inner channels prior to 1931. In
January 1919 the commission agreed to undertake the future main-
tenance of the channels in the inner harbor to a depth commensurate
with that obtained on the outer bar by the United States. Under
that agreement the commission has expended $849,884, exclusive of
$506,942 expended for the maintenance of turning basins and slips
at the public terminals. About 81/2 miles of channel, 200 to 350 feet
wide have been deepened to approximately 26 feet at mean lower low
water and two turning basins have been dredged to the same depth.
This channel is now under maintenance by the United States.
    The River and Harbor Act of July 3, 1930, adopting the 16-foot
channel, provides that local interests contribute one-half the first
cost, estimated at $211,500, and give assurances satisfactory to the
Secretary of War and Chief of Engineers that they will assume the
entire cost of maintenance of same, and provide a suitable public
terminal at Montesano. These assuranded have been given and
 $35,834.27 contributed, which was expended in 1931 with an equal
amount of Government funds in securing a 12-foot channel to Monte-
sano, the remaining contribution necessary to complete the project
being deferred until a later date, as approved by the Secretary of
War, March 18, 1931.
    The River and Harbor Act of August 30, 1935, provides that the
Grays Harbor Port Commission shall continue to remove all snags
and deadheads from the channels, shall furnish free of cost to the
United States suitable areas for the disposal of dredged material
as and when needed, and shall assist in the work of maintenance by
loaning to the United States, when not required on the work of
the commission, its pipeline dredge without charge other than reim-
bursement to the Port of Grays Harbor Commissioners for the operat-
ing costs of the dredge on a basis approved by the Chief of En-
gineers; pay one-half the first cost of enlarging the channel above
Cosmopolis, and maintain the channels above the Union Pacific Rail-
road bridge at Aberdeen.
    Terminal facilities.-There are 19 sawmill wharves, 9 industrial
wharves, 2 miscellaneous wharves, 1 oil wharf, 1 railroad wharf, and
  2 port terminals, the last 3 and 1 sawmill wharf being open to the
  general public. These facilities are considered adequate for existing
commerce. (For further details see Port Series No. 7, Corps of
Engineers.)
         RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT             1557

   Operationand results during fiscal year.-Under regular appropri-
ations, maintenance dredging was continued intermittently by the
U. S. dredges Kingman, Michie, and Mackenzie a total of 6 dredge-
months, 888,242 cubic yards being removed from the bar channel,
28,848 cubic yards from the cross-over channel, and 410,693 cubic
yards from the inner channel, at a cost of $140,884.77. Maintenance
dredging was done in the 26-foot channel below Aberdeen with
leased plant, 574,016 cubic yards being removed at a cost of
$41,865.56. Under continuing contract, the reconstruction of the
south jetty was continued with regular funds, 493,024.5 tons of rock
being placed at a cost of $1,114,080.32. The total costs from regular
funds were $1,296,830.65, all for maintenance, and the total expendi-
tures were $1,103,464.77.
   With emergency relief funds, the contract for reconstruction of a
portion of the south jetty was completed by placing 9,082.1 tons of
rock, at a cost of $21,184.74, all for maintenance. The expenditures
were $118,576.97.
   Condition at end of fiscal year.-The existing project is 88 percent
completed. The south jetty was completed in 1902 with a groin at
station 1050. The inner 3,900 feet is at elevation plus 20. The next
1,900 feet is in various stages of reconstruction. Beyond this the old:
enrockment is very irregular, varying from 1 to 10 feet below datum,.
with an average elevation of about 7 feet below datum. The north
jetty was completed to midtide elevation in December 1913. It was
later restored and raised to or above ordinary high water, this work
being completed in January 1916. The present enrockment slopes
from about 12 feet above datum at the high-water shore line to ele-
vation zero in about 900 feet. From this point it falls in an irregu-
lar manner to 3 feet below datum in the next 2,600 feet and remains
at about this elevation of minus 3 for about 3,300 feet. The last 400
feet of jetty enrockment are at about 1 foot below datum.
  The 26-foot channel previously dredged by the Port of Grays
Harbor below Aberdeen was redredged in 1934 and 1936, the 18-foot
channel below Cosmopolis and 6-foot channel between Cosmopolis
and Montesano were completed in 1910, and the latter was deepened
to 12 feet in 1931.
  The controlling depths when last ascertained were as follows: Bar
channel, 27 feet over a width of 500 feet (July 1937); inner harbor
and river channel below Aberdeen, 23 feet (June 1937) ; Aberdeen to
Cosmopolis, 21 feet (October 1929); Cosmopolis to Montesano, 10
feet (1934).
  The work remaining to be done to complete the existing project is
increasing the channel depth between Cosmopolis and Montesano to
16 feet.
  The costs of the existing project under regular appropriations have
been $2,842,015.86 for new work and $4,428,116.34 for maintenance,
a total of $7.270,132.20, and the total expenditures have been
$7,075,972.07. The costs and expenditures from Public Works funds
for maintenance dredging have been $57,000.
  The costs and expenditures from emergency relief funds have been
$409,659.55, all for maintenance.
1558         REPORT OOF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The total costs, all Federal funds, have been $2,842,015.86 for new
work and $4,894,775.89 for maintenance, a combined total of $7,736,-
791.75. The total expenditures have been $7,542,631.62. In addition,
$35,834.27 has been expended from contributed funds for new work
and $47,889.45 for maintenance, a total of $83,723.72.
  Proposed operations.-The funds unexpended June 30, 1937, $91,-
449.41, together with allotments of $1,600,000 made during July 1937,
will be applied to maintenance, as follows:
Accounts payable June 30, 1937_-__:_              --- _-___---__
Continue reconstruction of south jetty by contract throughout
                                                                                  $41, 613.96

  the year----------------------------------------                              1,440,000.00
Operation of a sea-going hopper dredge on the bar channel, a total
  of about 71/2 dredge-months (July 1-Nov. 15, 1937, and Apr.-
  June 1938) -------------------------------------------                          195,000.00
Dredging in the 26-foot channel below Union Pacific bridge at
  Aberdeen, by lease of port dredge, October 1937                _--___-------_    14, 835. 45

        Total----------------------------_1,691,449.                                                                    41
   The additional sum of $1,738,000 can be profitably expended dur-
ing the fiscal year 1939, for maintenance, as follows:
Completion of reconstruction of south jetty by contract through-
  out the year__----------    --------------------------------       $1, 000,000
Commence reconstruction of north jetty, by contract, and continue
  throughout the year___________________-____-____             ___       500, 000
Operation of one sea-going hopper dredge on the bar channel, a total
  of about 7 dredge-months (July-Oct. 1938 and Apr.-June 1939) __        180, 000
Dredging in the 26-foot channel below Union Pacific bridge at
  Aberdeen, by lease of port dredge, July-October 1938----------          58, 000

          Total_----_ ______________                    ______-------------------------------                1, 738,000
   The increased cost of maintenance is due to the jetty reconstruction
and maintenance of the 26-foot channel below Aberdeen provided for
by the River and Harbor Act of August 30, 1935.
                                      Cost and financial summary
                              MAINTENANCE              AND IMPROVE9MENT FUNDS

Cost of new work to June 30, 1937________----------------------                                      $2, 955,150. 24
Cost of maintenance to June 30, 1937----------------------                                            4, 522, 531. 79

      Total cost of permanent work to June 30, 1937----------                                            7, 477. 682. 03
Minus accounts payable June 30, 1937 ------------------------                                               194, 160. 13

     Net total expenditures   ----------------------------
                             _--                                                                     2   7, 283, 521. 90
Unexpended balance June 30, 1937_______                                                                      91, 449. 41

        Total amount appropriated to June 30, 1937-----------                                        2   7, 374, 971. 31

   Fiscal year ending June 30              1933              1934            1935             1936               1937


Cost of new work----------------
Cost of maintenance_____                $199, 928.04      $159,979. 42    $205, 864. 43    $228, 123. 48    $1, 296,830. 65
Total expended_     _                    186, 150. 74
                           __------------------            137, 012. 64   -68, 977. 95      224, 405. 20      1,103, 464. 77
Allotted....
         -----------     ----------      332, 611. 08      149, 075.02    -30, 090. 56    1, 230,000. 00       -55,000. 00

   1 Includes $57,000 expended from Public Works funds.
  2 In addition, $35,834.27 for new work and $47,889.45 for maintenance was expended
from contributed funds.
               RIVERS AND HARBORS-SEATTLE, WASH, DISTRICT                                                                               1559,
Balance unexpended July 1, 1936___ __________________                                                                      $1, 249, 914. 18
Amount allotted from War Department Appropriation Act ap-
  proved April 26, 1934 _____---. __________________                                                __----                       30, 000.00
      Amount to be accounted for________-_____-______-_                                                                       1, 279, 914. 18
Deductions on account of revocation of allotment_                                                                           -     8----------
                                                                                                                                 85,  000. 00
           Net amount to be accounted for                                       _________1,                                       194, 914. 18
Gross amount expended__-_----_--     _________-                                            $1, 110,648.01.
Less reimbursements collected___-----_-_                                                         7, 183. 24
                                                                                                                               1, 103, 464.77
      Balance unexpended June 30, 1937________________ ___--91,                                                                        449. 41
Outstanding liabilities June 30, 1937,--________ _   $194, 314. 05
Amount covered by uncompleted contracts -        - 31, 834, 463. 88
                                                                                                                               2, 028, 777. 93

     Balance available June 30, 1937____----                     _ -1, 937, 328.52
                                                                 -_______
Amount allotted during July 1937_ ______-__-____-----------           1, 600, 000. 00
     Balance available for fiscal year 1938_                            -- 337, 328. 52
Amount (estimated) required to be appropriated for completion
of existing project 4 5________________                                   175, 000. 00,
Amount that can be profitably expended in fiscal year ending
                                    ----- ---- ----- ----- -
June 30, 1939, for maintenance 4                            - - -     1, 738, 000. 00
  3 Continuing contract commitment for reconstruction of south jetty.
  'Exclusive of available funds.
  6 Exclusive of $175,000 to be contributed by local interests.
                                                   EMERGENCY RELIEF                 FUNDS

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937__________________                                              ---           -              $409, 659. 55
      Total cost of permanent work to June 30, 1937___                                                                            409, 659.55
Net total expenditures_______________________                                                                              -      409, 659. 55
Total amount appropriated to June 30, 1937_                                                                                       409, 659.55

           iFiscal year ending June 30                               1933           1934            1935                  1936          1937


Cost of new work    --                                        -            --
Cost of maintenance    _                                           _____           _____      ___                388, 474.81
                                                                                                           ____ $_______              $21, 184. 74
Total expended ______________             ______________                                                         291, 082. 58         118, 576. 97
Allotted       -------------------------------------------------                               $410,000         .......                 -340.   45


Balance unexpended July 1, 1936-----                                                                                             $118, 917.42
Deductions on account of revocation of allotment -----------------          340. 45
      Net amount to be accounted for                                   118, 576. 97
                                                                   _...--
Gross amount expended ---------------------------- $119, 423. 82
Less receipts from sales---------------------------_        846. 85
                                                                       118, 576. 97
CONSOLIDATED           COST       AND        FINANCIAL               SUMMARY        FOR GRAYS         HARBOR               AND CHEHALIS
                                                                  RIVER, WASH.

Cost of new work to June 30, 1937_---------------------------                                                              $2, 955, 150. 24
Cost of maintenance to June 30, 1937------------------------                                                               14, 932, 191.34
     Total cost of permanent work to June 30, 1937------------ 7, 887, 341. 58
Minus accounts payable June 30, 1937--------------------------    194,160.13
     Net total expenditures ------------------------------                                                                12   7, 693, 181. 45
Unexpended balance June 30, 1937----------------------------                                                                       91, 449. 41
                                                                                                                      - "
         Total amount appropriated to June 30, 1937                 -----7, 784, 630. 86
   1 Includes $57,000 expended from Public Works funds.
   2 In addition, $35,834.27 for new work and $47,889.45 for maintenance was expended
from contributed funds.
1560             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


    Fiscal year ending June 30                   1933           1934            1935             1936                1937


Cost of new work--------..........--..........-------------------------------...............................--------------
Cost of maintenance-----------.............   $199,928. 04    $159,979.42    $205,864. 43     $616, 598. 29     $1, 318, 015. 39

Total expended------------- ---                186,150. 74    137, 012. 64   -68, 977. 95      515, 487. 78      1, 222, 041. 74

Allotted .....-..--.--      t..-----...        332, 611. 08   149, 075. 02    379, 909. 44   1, 230, 000. 00      -55, 340. 45



Balance unexpended July 1, 1936----------------------------- $1, 368, 831. 60
Amount allotted from War Department Appropriation Act ap-
  proved Apr. 26, 1934---------------------------------           30, 000.00

     Amount to be accounted for__                                                                          398, 831.60
                                                                                                         1___________------1,
Deductions on account of revocation of allotment-------                                                     85, 340. 45

      Net amount to be accounted for-                                                                      ,313, 491. 15
                                                                                                          1--------------------
Gross amount expended --------------------- $1, 230, 071. 83
Less:
    Reimbursements collected-------- $7, 183. 24
    Receipts from sales --------------   846. 85
                                                  8, 030. 09
                                                                                                         1, 222, 041. 74

      Balance unexpended June 30, 1937----------------------                                                    91, 449. 41
Outstanding liabilities June 30, 1937------------- $194, 314. 05
Amount covered by uncompleted contracts------- 1,834, 463. 88
                                                                                                         2, 028, 777. 93

     Balance available June 30, 1937----------------------1,    937, 328. 52
Amount allotted during July 1937 ____------ - - __ __ --     1, 600, 000.00

      Balance available for fiscal year 1938_--    -- --                                                 -337,       328. 52
Amount (estimated) 3required to be appropriated for completion
of existing project _-          __-                                                                           175, 000. 00
Amount that can be profitably expended    in fiscal year ending
                                                           .
                                   ..
June 30, 1939, for maintenance 3___________      ________                                               1, 738, 000. 00
s Exclusive of available funds.

                                        3. QUILLAYUTE RIVER, WASH.

   Location.-This river is formed by the junction of the Soleduck
and Bogachiel Rivers, and flows westerly 5 miles to the Pacific
Ocean at La Push, Wash., about 30 miles south of Cape Flattery.
 (See U. S. Coast and Geodetic Survey Chart No. 6102.)
   Existing project.-This provides for a jetty on the easterly side
of the mouth, and a dike, with groins, on the westerly side, with a
view to stabilizing the entrance channel. The length of the section
included in the project is 1,500 feet. The range between mean lower
low water and mean higher high water is 8.8 feet.
   The estimate of cost of new work, revised in 1931, is $84,000 and
$4,000 annually for maintenance during the first 2 years and $1,000
annually thereafter.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 125, 71st Cong., 1st sess.). This document
contains the latest published map of the locality.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are no dockage facilities other than
landing places for small boats.
   Operations and results during fiscal year.-None.
            RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                        1561
   Condition at end of fiscal year.-The existing project is 80 percent
completed. The construction of the jetty and dike was commenced
April 1931 and completed in October 1931. The groins were omitted.
   A survey in July 1935 showed that the center of the dike had settled
over a distance of about 200 feet, the greatest settlement being to ele-
vation -2 feet. About 300 feet of the jetty had settled, the center
100 feet being at elevation -7 feet. The settlement is protected,
however, by a gravel bar, top elevation +11 feet, lying seaward of
the low point. The controlling depth in the entrance channel was
6.3 feet.
   The work remaining to be done to complete the project is construc-
tion of the groins based on the dike and James Island.
   The costs and expenditures have been $68,000 for new work and
$32,607.55 for maintenance, a total of $100,607.55.
   Proposed operations.-No operations are proposed during the fiscal
year 1938. The unexpended balance of $7,743.18 was revoked July
1, 1937.
   The sum of $10,000 can be profitably expended during the fiscal
year 1939 in repairing the jetty and dike, by contract, during July
and August, 1938.
                                 Cost and financial summary
Cost of new work to June 30, 1937--________ ___ _________      _ $68, 000. 00
Cost of maintenance to June 30, 1937______---- ________________ 32, 607. 55
        Total cost of permanent work to June*30, 1937_________-__100, 607. 55

Net total expenditures---------------------------------100,                                                    607. 55
Unexpended balance June 30, 1937----------------------------                                                7, 743. 18
        Total amount appropriated to June 30, 1937--------------                                          108,350. 73

        Fiscal year ending June 30            1933             1934             1935            1936           1937

Cost of new work--------------------              ---------------------------------------------
Cost of maintenance___---------------       $32, 350. 73 ----------------------- $256.82
Total expended....-----------------------   32, 350. 73 .-------------...........---------        256. 82
Allotted----------------------------2,649.27------------
                                              ............                      $8,000.................


Balance. unexpended July 1, 1936_ - ______---           --    ----      _____-_  $7, 743.18
Balance unexpended June 30, 1937-----------------------------                     7, 743. 18
Amount (estimated) required to be appropriated for completion of
  existing project-------------------------------------                         116, 000.00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance                              .--------------
                                                                 ------    - _- 110, 000. 00
  1 Exclusive of available funds.

          4. PUGET SOUND AND ITS TRIBUTARY WATERS, WASH.

   Location.-Puget Sound is located in the western part of the State
of Washington. (See U. S. Coast and Geodetic Survey Charts Nos.
6300, 6450, and 6460.)
   Previous projects.-Adopted by the River and Harbor Act of
August 2, 1882. The cost and expenditures were $67,495.58 for main-
tenance prior to adoption of the existing project in 1892. For further
details see page 2003 of Annual Report for 1915.
1562          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Existing project.-This provides for maintenance of the rivers
tributary to Puget Sound by snagging and dredging. The latest
 (1928) approved estimate for annual cost of maintenance is $25,000.
The existing project was adopted by the River and Harbor Act of
July 13, 1892. (Annual Report for 1893, p. 3425.) The latest pub-
lished map is in the Annual Report for 1913, page 3127.
   Terminal facilities.-The terminal facilities at the numerous local-
ities on Puget Sound and its tributary waters are in general con-
sidered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. snagboat
W. T. Preston operated 12 months in the waters tributary to Puget
Sound, removing 1,431 snags, 45 piles, 110 trees, dredging 21,364
cubic yards of material from shoals, placing channel markers, and
placing 2 cords of brush and 1,295.4 tons of rock to close subsidiary
sloughs. The work was done by hired labor at a cost of $31,819.83,
all for maintenance. The expenditures were $31,800.83.
   Condition at end of fiscal year.-The work has consisted chiefly of
snagging and dredging in the principal tributaries of Puget Sound.
No permanent results are obtainable, but the maintenance of exist-
ing channels requires practically continuous operation of the snag-
boat. The controlling depths range from 1 to 40 feet at mean lower
low water. The costs have been $43,336.92 for new work and $806,-
195.56 for maintenance, a total of $849,532.48. The total expenditures
have been $849,513.48.
   Proposed operations.-The 'funds unexpended June 30, 1937, $1,-
576.39, together with allotments of $25,000 made during July 1937,
will be applied to maintenance, as follows:
Accounts payable June 30, 1937------------------------------------      $19. 00
Operation of the U, S. snagboat W. T. Preston in snagging and dredg-
  ing, 10 months, July 1937-April 1938----------------------------- 26, 557.39
         Total ---------------------------------------------------                                  26, 576. 39
  The additional sum of $35,000 can be profitably expended during
the fiscal year 1939 in operation of the snagboat for maintenance
snagging and dredging throughout the year, the work being necessary
to keep the project channels open for navigation.
                                      Cost and financial summary
Cost of new work to June 30, 1937-------------------------------$43, 336. 92
Cost of maintenance to June 30, 1937----------------------------873, 691. 14
      Total cost of permanent work to June 30, 1937--------------- 917, 028.06
Minus accounts payable June 30, 1937----------------------    --         19. 00

      Net total expenditures-------------------     ------------                                    917, 009. 06
Unexpended balance June 30, 1937---------------------------                                           1, 576. 39

         Total amount appropriated to June 30, 1937-----------------                                918, 585. 45

   Fiscal year ending June 30            1933           1934            1935           1936             1937


Cost of new work .-----------------
Cost of maintenance------------        $23, 809. 75   $27, 232. 09    $27, 131. 97   $29, 307. 40      $31,819.83

Total expended_       - - ----
                     _--                21, 978. 03    21, 473. 75   -17, 585. 63     29, 324. 25       31, 800. 83
Allotted . --         ---------
                  -......               23, 608. 37    22, 400. 00   -20, 412. 44     29, 300. 00       10, 000. 00
           RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                      1563
Balance unexpended July 1, 1936-...  __       __--------------__ $23, 377.22
Amount allotted from War Department Appropriation Act approved
May 15, 1936---------------------------------------------        10, 000. 00
      Amount to be accounted for __--_________-----___                  33, 377. 22
Gross amount expended ____-_____ -           - __-- _____$31, 981.33
Less reimbursements collected__________-----       -----      180. 50
                                                                        31, 800. 83
      Balance unexpended June 30, 1937 --------------------------        1, 576. 39
Outstanding liabilities June 30, 1937 -----------------------------         196. 50
     Balance available June 30, 1937----------------                     1, 379. 89
Amount allotted during July 1937----------------------------            25, 000. 00
     Balance available for fiscal year 1938------------------------     26, 379. 89
Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance 1_--    ___-____-----__________________          35, 000. 00
  1 Exclusive of available funds.

5. WATERWAY CONNECTING PORT TOWNSEND                     BAY AND OAK BAY,
                         WASH.

   Location.-The canal connects two bays which are arms of Admi-
ralty Inlet, on the west side of Puget Sound, in the northwestern part
of the State of Washington, about 40 miles north of Seattle. (See
U. S. Coast and Geodetic Survey Chart No. 6405.)
   Existing project.-This provides for a canal 15 feet deep at mean
lower low water, 75 feet wide on the bottom and about 4,800 feet
long, and for the construction of jetties to protect the channel at the
southern or Oak Bay end, and a bulkhead for the retention of dredged
material. The extreme tidal range is 16 feet. The range between
mean lower low water and mean higher high water is 8.8 feet in
Port Townsend Bay and 9.6 feet in Oak Bay.
   The estimate of cost for new work, revised in 1915, was $77,500.
The latest (1918) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913. (H. Doc. No. 625, 62d Cong., 2d sess.) The latest
published map is in the Annual Report for 1915, page 3441.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are no terminal facilities directly served
by the canal.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1915 at a saving of $4,178 under the estimated cost. Shoaling was
removed by hired dredge in 1916 and 1920, by contract in 1930, and by
Government plant in 1932. Repairs to the bulkhead on the west side
of the channel were made during the fiscal years 1922, 1923, 1925, and
1928, and to the west jetty in 1925. A survey completed August 30,
1934, showed a controlling depth of 131/2 feet over the full width.
The costs and expenditures have been $73,322.35 for new work and
$49,523.42 for maintenance; a total of $122,845.77.
  Proposed operatios.--It is proposed to transfer to Seattle Harbor,
Wash., $10,000 from allotment of $15,000 made during July 1937 and
apply the remainder ($5,000) to maintenance dredging, by hired
labor and Government plant, during September and October 1937.
1564        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  No additional funds can be profitably expended during the fiscal
year 1939.
                                     Cost and financial summary
Cost of new work to June 30, 1937--------------------------                             $73, 322.35
Cost of maintenance to June 30, 1937--------------------------                           49, 523. 42
      Total cost of permanent work to June 30, 1937------------122, 845. 77
Net total expenditures--   --------------------------------      122, 845.77
Total amount appropriated to June 30, 193T------------------ --- 122, 845. 77

        Fiscal year ending June 30            1933            1934        1935   1936        1937


Cost of new work...                         $I. §
Cost of maintenance-..- __.---------$1, 198. 46
Total expended......    -...... ....
                                  _.         1, 198. 46
                ........
Allotted............                         1-------------------------
                                             1, 198. 46


Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937---------------------                      $15, 000. 00
Balance available for fiscal year 1938--------------------------15, 000. 00

                          6. PORT GAMBLE HARBOR, WASH.

   Location.-Port Gamble Harbor is on the east side of Hood Canal,
20 miles northwest of Seattle. (See U. S. Coast and Geodetic Survey
Chart No. 6450.)
   Existing project.-This provides for a channel 30 feet deep at mean
lower low water, 200 feet wide, and about 3,000 feet long at the
entrance to the bay. The range between mean lower low water and
mean higher high water is 10.3 feet.
   The estimate of cost for new work, revised in 1935, is $44,250, in-
cluding $25,500 to be contributed by local interests. The latest (1928)
approved estimate for annual cost of maintenance is $250.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919, and provided for a channel 28 feet deep, 150 feet wide,
and 2,500 feet long (H. Doc. No. 851, 65th Cong., 2d sess.), and the
present channel dimensions were authorized by the River and Harbor
Act of August 30, 1935 (H. Doc. No. 152, 72d Cong., 1st sess.). This
document contains the latest published map of the locality.
   Local cooperation.-Fullycomplied with, except as modified by the
River and Harbor Act of August 30, 1935, adopting the 30-foot chan-
nel, which provides that local interests shall contribute two-thirds of
the cost, but not to exceed $13,500. This condition has not been met,
and local interests reported under date of April 28, 1937, that, due
to recent heavy losses suffered by the lumber industry, they are unable
to bear such a large percentage of the cost at this time.
   Terminal facilities.-These consist of the mill wharves, which are
open to the public on payment of wharfage charges, and are con-
sidered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is 62 percent
completed. The original project for a 28-foot channel was completed
in 1920. Surveys made in November 1931 and January 1933 showed
a controlling depth of 28 feet the full width of the channel, and no
material shoaling is believed to have occurred since. The costs have
             RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                      1565
been $11,911.08 from Federal funds and $21,260.09 from contributed
funds for new work and $588.92 for maintenance, a total of $12,500
from Federal funds and $21,260.09 from contributed funds. The
total expenditures have been the same.
   Proposed operations.--No operations are proposed during the fiscal
years 1938 and 1939, as it is not likely that the terms of local coopera-
tion will be complied with during that time. The funds available
 ($6,750) will be held in reserve or transferred to other projects as
required.
                               Cost and financial summary
Cost of new work to June 30, 1937------------------------------1$11,          911. 08
Cost of maintenance to June 30, 1937------                                    588. 92
      Total cost of permanent work to June 30, 197------------         12, 500. 00
Net total expenditures     ---------------------------------           12, 500. 00
Total amount appropriated to June 30, 1937 ----------------            12, 500. 00
Amount allotted from War Department Appropriation Civil Act
approved July 19, 1937------------------                               6, 750. 00
Amount available for fiscal year 1938--------                ---- -    2 6,750. 00
  1   In addition $21,260.09 was expended from contributed funds.
  2   In addition $13,500 is to be contributed by local interests.

                          7. HAMMERSLEY INLET, WASH.

  Location.-This inlet connecting Puget Sound with Shelton Har-
bor, an arm of Oakland Bay, is located about 10 miles northwest of
Olympia, Wash. (See U. S. Coast and Geodetic Survey Chart No.
6460.)
  Existing project.-This provides for a channel 13 feet deep at mean
lower low water and 150 feet wide from the entrance of the inlet to
Shelton, a distance of about 7 miles. The extreme tidal range is
about 21 feet. The range between mean lower low water and mean
higher high water is 14 feet.
  The estimate of cost for new work, made in 1909, was $9,000. No
approved estimate for annual maintenance has been made.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 213, 61st Cong., 2d sess.). This document
contains the latest published map of the locality.
  Terminal facilities.-At Shelton there are two sawmill wharves,
and a scow berth adjacent to a pulp mill. Lumber and pulp are
handled to scows by crane and conveyor. There is also a city wharf
to which is attached a float for small boats. The float is open to
general public use on equal and reasonable terms. The face of the
wharf is leased to Puget Sound Freight Lines. These facilities are
considered adequate for the existing commerce.
   Operations and results during fiscal year.-A total of 20,416 cubic
yards was dredged under contract, restoring the project depth except
at one shoal 450 feet long with controlling depth of 10 feet. The cost
was $8,944.15, all for maintenance. The expenditures were $8,917.79.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1912, except for one shoal on which the controlling depth
was 10 feet, around which there is a natural channel with depth of
11.8 feet. The project depth is available in the remainder of the
channel. The costs have been $9.000 for new work and $8,944.15 for
maintenance, a total of $17,944.15. The expenditures have beell
$17,917.79.
1566            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Proposed operations.-Of the funds unexpended June 30, 1937,
$11,000 was revoked July 1, 1937, and the balance, $82.21, will be
applied to maintenance, as follows:
Accounts payable June 30, 1937                                                                                         $26. 36
Inspection costs-----------    -----                                                                                    55. 85
          Total----                ----------------------------------------------                                        82. 21
    No funds can be profitably expended during the fiscal year 1939, as
existing depths are sufficient for the present needs of navigation.,
                                            Cost and financial summary
Cost of new work to June 30, 1937- -- ------------------------  $9,000. 00
Cost of maintenance to June 30, 1937--------------------------- 8, 944. 15
     Total cost of permanent work to June 30, 1937-------------- 17, 944. 15
Minus accounts payable June 30, 1937-----------------------------     26. 36
     Net total expenditures  --------------------------------- 17, 917. 79
Unexpended balance June 30, 1937---------------------------- 11, 082. 21
          Total amount appropriated to June 30, 197----------------                                                 29, 000. 00

          Fiscal year ending June 30                       1933               1934                1935   1936           1937


Cost of new work..-------------------                                  -----------------------------------
Cost of maintenance----------...             --    -   -----      --     --                                            $8, 944.15

Total expended.....----------------------------------------------------                                                 8, 917. 79
Allotted-----------------------------------------------------------------$20,000


Balance unexpended July 1, 1936----------------------------$20, 000. 00
Gross amount expended----                                -    8, 917. 79
          Balance unexpended June 30, 1937
                                        ---                                          ----------                 _   11, 082. 21
Outstanding liabilities June 30, 1937------------------------------                                                      45. 73
          Balance available June 30, 19377                                    ------------------                    11, 036. 48

                                        8. OLYMPIA HARBOR, WASH.

  Location.-This harbor is near the southern end of Puget Sound at
the head of Budd Inlet, about 45 miles southwest of Tacoma. (See
U. S. Coast and Geodetic Survey Chart No. 6462.)
  Previous projects.-The original project was adopted by the River
and Harbor Acts of July 13, 1892, and June 25, 1910. The costs and
expenditures on this light-draft project prior to the adoption in 1927
of the existing project for a ship channel were $183,256.52 for new
work and $14,417.87 for maintenance, a total of $197,674.39. For
further details see page 1369 of Annual Report for 1934.
  Existing project.-This provides for a channel on the east side of
the harbor, between deep water in Budd Inlet and the port terminal,
30 feet deep at mean lower low water and 500 to 300 feet wide, with
suitable additional width at the bend, and a turning basin adjacent
to the port terminal 30 feet deep, 3,000 feet long, and 300 to 800 feet
wide. The extreme tidal range is 21 feet. The range between mean
lower low water and mean higher high water is 14.4 feet.
               RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                                               1567
   The estimate of cost for new work, revised in 1937, is $278,300,
exclusive of amounts expended on previous projects. The latest
(1935) approved estimate for annual cost of maintenance is $1,500.
   The existing project was authorized by the following river and
harbor acts: The act of January 21, 1927, provided for a channel
22 feet deep and 150 feet wide (H. Doc. No. 244, 69th Cong., 1st sess.);
act of July 3, 1930, provided for channels of 26-foot depth on east side
of the harbor (R. and H. Com. Doc. No. 5, 71st Cong., 1st siss.); act
of August 30, 1935 eliminated from the project the 12-foot channels
on the east and west sides of the harbor and authorized a channel
30 feet deep and 300 feet wide between Budd Inlet and the port ter-
minal, with turning basini of same depth (R. and H. Com. Doc. No.
21, 73d Cong., 2d sess.) (deepening to 30 feet was included in the
Public Works program in 1934); and the act of August 26, 1937, en-
larged the channel and turning basin to present project dimensions
 (R. and H. Com. Doc. No. 75, 74th Cong., 2d sess.). The latest pub-
lished map is in Rivers and Harbors Committee Document No. 75,
Seventy-fourth Congress, second session.
   Terminal facilities.-There are 10 wharves, 1 a publicly owned
terminal, and 9 privately owned. These facilities are considered ade-
quate for existing commerce. (For further details see Port Series No.
23, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The existing project is 65 percent
completed. A channel 30 feet deep and 300 feet wide and a turning
basin 30 feet deep, 2,000 feet long, and 800 feet wide were completed
in 1934, and these dimensions still obtain. The work remaining to be
done to complete the existing project is the widening of the entrance
channel to 500 feet and enlarging the turning basin as authorized by
the River and Harbor Act of August 26, 1937.
   The costs and expenditures from regular appropriations have been
$180,221.78 for new work, including $105,467 Public Works funds,
and $69.85 for maintenance, a total of $180,291.63.
   Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1938.
   The sum of $98,000 can be profitably expended during the fiscal
year 1939 for new work, completing the project by dredging under
contract, October-December 1938.
                                            Cost and financial summary
Cost of new work to June 30, 19371 -------------------------------                                                             $363, 478. 30
Cost of maintenance to June 30, 1937----------------------------                                                                 14, 487. 72
      Total cost of permanent work to June 30, 1937--------------                                                                377, 966. 02
Net total expenditures 1------------------       --         ---                                                                  377, 966. 02
           Total amount appropriated to June 30, 19371------                                                     ------          377, 966. 02

           Fiscal year ending June 30                             1933               1934             1935              1936             1937

Cost of new work                                      ------------
                      ----------------......................................     $76, 649. 57     $28, 817. 43
Cost of maintenance              ----------------------                    ------------------------------....................-------------
Total expended               -     ------...............-------......             55, 469. 23      49, 997. 77
Allotted                         -------------                            92, 000. 00
                                                           ------------ "------------- 13, 467. 00                      .

  1 Includes $105,467 expended from Public Works funds.
        20196---37--pt. 1-99
1568     ItEPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937
Amount (estimated) required to be appropriated for completion of
existing project-----------------------------------------------         $98, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work---------------------------------         -----     8, 000. 00
                        9. TACOMA HARBOR, WASH.
   Location.-This harbor is 30 miles south of Seattle and embraces-
Commencement Bay and tributary waterways. (See U. S. Coast and
Geodetic Survey Chart No. 6451.)
   Previous project.-The project for the Puyallup Waterway was
adopted by the River and Harbor Act of March 3, 1905, and aban-
doned by the River and Harbor Act of August 30, 1935. The costs
and expenditures on this project were $159,584.46 for new work and
$4,415.54 for maintenance, a total of $164,000. For further details
see pages 1372 to 1376 of Annual Report for 1934.
   Existing project.-This provides for (a) a city waterway having
a channel 500 feet wide and 29 feet deep at mean lower low water
from deep water in Commencement Bay to the Eleventh Street
bridge, 500 feet wide and 22 feet deep to the Fourteenth Street bridge,
and varying from 500 to 250 feet wide and 19 feet deep from the
Fourteenth Street bridge to the end of this waterway, a total length
of 8,500 feet; (b) for a channel in Hylebos Waterway 200 feet wide
and 30 feet deep from Commencement Bay to the bend below Lincoln
Avenue, thence 150 feet wide and 30 feet deep to a turning basin of
the same depth at the inner end,.410 feet wide and 900 feet average
length; (c) construction of two training walls, each about 700 feet
long, at the mouth of Puyallup River; and (d) maintenance of a
channel in Wapato Waterway 700 feet wide and 34 feet deep over
such length as shall have been dredged by local interests to dimen-
sions stated.
   The extreme tidal range is 18.8 feet. The range between mean
lower low water and mean higher high water is 11.8 feet.
   The estimate of cost for new work, revised in 1937, is $437,800,
exclusive of amounts expended on previous projects.
   The latest approved estimates for annual cost of maintenance are
as follows: City waterway (1928), $5,000; Hylebos waterway (1937),
$2,000; Wapato waterway (1933), $1,000; Puyallup River training
walls (1933), $2,500.
   The existing project was adopted by the following river and har-
bor acts: The act of June 13, 1902, provided for the city waterway
 (H. Doc. 76, 56th Cong., 2d sess.); the act of July 3, 1930 (Rivers
and Harbors Committee Doc. 25, 71st Cong., 2d sess.), modified by
the act of August 26, 1937 (Rivers and Harbors Committee Doc. 91,
74th Cong., 2d sess.), provided for the Hylebos waterway; and the
act of August 30, 1935, provided for the training walls at the mouth
of Puyallup River, and for maintenance of Wapato waterway (Riv-
ers and Harbors Committee Doc. 55, 72d Cong., 2d sess.). Prior to
adoption by the act of August 30, 1935, the two training walls were
authorized September 6, 1933, by the Public Works Administration.
The latest published maps are contained in the following documents:
Rivers and Harbors Committee Documents Nos. 25, Seventy-first Con-
gress, second session, and 91, Seventy-fourth Congress, second session,
for the Hylebos Waterway, and House Document No. 167, Seventy-
second Congress, first session, for the Wapato Waterway.
        RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT               1569
  Local cooperation.-Underthe provisions of the River and Har-
bor Act of August 26, 1937, local interests are required to furnish
necessary rights-of-way and suitable bulkheaded areas for disposal
of dredged material. It is believed that these conditions will be met
when funds are available for the work. All prior requirements have
been fully complied with.
   Terminal facilities.-There are 62 wharves and piers at Tacoma.
Of these, 19 are located on Commencement Bay, 21 on City Water-
way, 3 on Middle Waterway, 4 on Milwaukee Waterway, 7 on Wa-
pato Waterway, and 8 on Hylebos Waterway. Twenty-five of them,
with 20,841 feet of berthing space, are suitable for the use of ocean-
going carriers; nine of this class, two of which are publicly owned,
are general cargo terminals, and one serves a publicly owned grain
elevator, all being open to public use on equal terms.
   These facilities are considered adequate for existing commerce.
(For further details see Port Series No. 7, pt. 2, Corps of Engineers.)
   Operations and results during fiscal year.-The project depth in
City Waterway above Twenty-first Street was restored by dredging
under contract, 62,608 cubic yards being removed, at a cost of $16,-
665.53, all for maintenance. The expenditures were $16,665.53.
   Condition at end of fiseal year.-The existing project is 74 percent
completed.
   The City Waterway was completed in 1905. The cost of new work
on this waterway has been $150,018.58 and of maintenance, $113,-
593.57, a total of $263,612.15. not including $5,000 expended for
maintenance from contributed funds. A survey in March 1937
showed controlling depths as follows: Below South Eleventh Street,
28 feet; South Eleventh to South Fourteenth Streets, 20 feet; South
Fourteenth to South Twenty-first Streets, 17 feet.          The section
above South Twenty-first Street was redredged to project depth of
19 feet in February 1937.
   The originally authorized channel in Hylebos Waterway 200 feet
wide and 30 feet deep from Commencement Bay to the bend at Lin-
coln Avenue, a distance of about 10,000 feet, thence 150 feet wide and
26 feet deep to the head of the waterway, a distance of about 3,000
feet, was completed in 1931. The cost of this waterway has been
$124,085.51 for new work and $8,987.88 for maintenance, a total of
$133,073.39. A survey in April 1937 showed controlling depths as
follows: Below East Eleventh Street, 30 feet; Eleventh Street to
Lincoln Avenue, 26 feet; above Lincoln Avenue, 24 feet except for
additional shoaling in upper 300 feet.
   The two training walls at the mouth of Puyallup River were com-
pleted in 1934 at a cost and expenditure of $51,609.12, all for new
work. The walls are in good condition.
   No maintenance work has been done by the Government on Wapato
Waterway. The latest survey made in April 1937 showed a control-
ling depth of 32.6 feet over a width of about 600 feet in the lower
1,600 feet of the waterway, thence a channel 100 feet wide with mini-
mum depth of 17 feet extended southerly along the westerly margin
of the waterway for about 1,700 feet; the remaining area of the
waterway has not been improved, and depths therein vary from 14
feet below mean lower low water to about 8 feet above that datum.
1570              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The work remaining to be done to complete the existing project
is to deepen the channel in Hylebos Waterway to 30 feet from the
bend below Lincoln Avenue to the head of the waterway, and to
dredge the turning basin at the inner end, authorized by the River
and Harbor Act approved August 26, 1937.
   The costs and expenditures from regular appropriations have been
$274,104.09 for new work and $122,581.45 for maintenance, a total of
$396,685.54, not including $5,000 contributed funds for maintenance.
The costs and expenditures from Public Works funds have been
$51,609.12, all for new work.
   Proposed operations.-The unexpended balance of $1,334.47 was
revoked July 1, 1937, and no operations are proposed during the fiscal
year 1938.
   The sum of $112,000 can be profitably expended during the fiscal
year 1939 for completing the existing project by deepening the chan-
nel in Hylebos Waterway to 30 feet from the bend below Lincoln
Avenue to the head of the waterway and dredging the turning basin
.at the inner end, by contract, January-March 1939.
                                            Cost and financial summary
Cost of new work to June 30, 1937_____-- ________- _______-$485,                                                        297. 67
Cost of maintenance to June 30, 1937 ---__--   _____________-                                                     2126, 996.99
            Total cost of permanent work to June 30, 1937------------                                               612, 294. 66

                                   -
Net total expenditures_________________--___-                                                                  12   612, 294. 66
Unexpended balance June 30, 1937 ----------------                                                   ___---1,             334.47

            'Total amount appropriated to June 30, 1937_____________                                           12 613, 629. 13

           Fiscal year ending June 30                        1933           1934            1935           1936          1937


Cost of new work            --------......-                          $51, 609. 12 .
                                                      ..---------.........
Cost of maintenance.._.....                           ----.-------- 8,987. 88
                                                    ..-------------.                                      .....        $16,665.53
Total expended.....-----             ..                 -----------. 60, 597. 00
                                                    ..-------------                                                 16, 665. 53
                                                                                                   .-----------------------
Allotted............---------..   ------------...........--------------   60, 597. 00   -          .---------..
                                                                                                            -
                                                                                                            .....      - 18, 000. 00


Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936-----------------------------------                                                            $18, 000. 00
Gross amount expended------             -------------------------                                                    16, 665. 53

     Balance unexpended June 30, 1937                                     -----------
                                                                                  _,                                     334. 47
                                                                                                                      1------
Amount (estimated) required         to be appropriated              for completion of
                    -- - - - - - - - - - - - - - - - - - - - - - - -- - - -
existing project ____                                                                                              112, 000. 00
Amount that can be profitably expended in fiscal year ending June
    30, 1939, for new work ---------------------------------                                                        112, 000. 00
    2Includes $51,609.12 expended from Public Works Administration funds.
    2 In addition $5,000 was expended from contributed funds.
    3 Exclusive of available funds.

                                      10. SEATTLE HARBOR, WASH.

   Location.--This harbor includes all waterways within the city lim-
its of Seattle. The chief anchorage basin is Elliott Bay, an arm of
Puget Sound, 30 miles north of Tacoma. (See U. S. Coast and
Geodetic Survey Chart No. 6445.)
        RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                1571

   Existing project.-This provides for maintenance of the east and
west waterways to a depth of 34 feet at mean lower low water, with
a width of 750 feet for distances of 6,500 and 5,200 feet, respectively,
from the pierhead line in Elliott Bay; for the maintenance of east
waterway between the upper end of the 750-foot section and Spokane
Street, 34 feet deep, 700 feet long and 400 feet wide, and of a turning
basin, including the head of the east waterway at the junction of the
waterways south of the Chicago, Milwaukee, St. Paul & Pacific Rail-
way bridge, to a depth of 30 feet, after these sections of the water-
way have been dredged by local interests to full project dimensions;
and for dredging the Duwamish Waterway 200 feet wide and 30
feet deep at mean lower low water between the west waterway and
First Avenue South, 150 by 20 feet between First and Eighth Ave-
nues South, thence 150 by 15 feet to a point about 1.4 miles above
Fourteenth Avenue South Bridge, with a turning basin 600 by 350
feet and 20 feet deep just south of the First Avenue South Bridge,
and a turning basin 500 by 250 feet and 15 feet deep and settling
basin with capacity of about 100,000 cubic yards at the upper end of
the waterway, a distance of 27,060 feet, or 5.12 miles.
   The total length of waterways included under the project is about
71/2 miles. The range between mean lower low water and mean
higher high water is 11.28 feet.
   The estimate of cost for new work, revised in 1930, was $381,000,
of which $140,476 was to be contributed by local interests. The latest
 (1935) approved estimate of annual cost of maintenance is $4,750
for the east waterway, $6,000 (revised in 1928) for the west water-
way, and $48,000 (made in 1922) for the Duwamish Waterway.
   The existing project was adopted by the following river and har-
bor acts: The act of March 2, 1919 (S. Doc. No. 313, 65th Cong., 3d
sess.), provided for maintenance of the east and west waterways 750
feet wide and 34 feet deep, and of the Duwamish Waterway, 20 feet
deep and 150 feet wide, as far south as the Eighth Avenue South
Bridge; acts of March 3, 1925 (H. Doc. No. 108, 68th Cong., 1st
sess.), and of July 3, 1930 (H. Doc. No. 126, 71st Cong., 2d sess.),
provided for enlarging the Duwamish Waterway, and the act of
August 30, 1935 (H. Doc. No. 211, 72d Cong., 1st sess.), provided for
maintenance of the east waterway between the 750-foot section and
Spokane Street and of the turning basin at the junction of the east
and west waterways. The latest published maps of the locality are
in the two last-mentioned documents.
   Local cooperation.-Complied with.
   Terminal facilities.-There are 88 piers and wharves located in
Seattle, exclusive of those on Salmon Bay, Lake Union, and Lake
Washington, which are given under the report for "Lake Washing-
ton Ship Canal." Fifty are located on Elliott Bay, 16 on east water-
way, 6 on west waterway, 15 on Duwamish Waterway, and 1 on
Shilshole Bay; 31 of them are commercial terminals open to public
use on equal terms, 3 of which serve grain elevators. The present
facilities are believed to be adequate for the existing commerce. (For
further details see Port Series No. 7, Corps of Engineers.)
  Operations and results during fiscal year.-None. There were no
costs or expenditures.
1572          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Condition at end of fiscal year.-The existing project was com-
pleted in 1931, except the settling basin. The controlling depths
when last ascertained were as follows: The 750-foot section of east
waterway, 34 feet, except in southwest corner and along east side, in
April 1932, and on a narrow shoal with depth of 32 feet in the middle
of the waterway in November 1934; west waterway, 34 feet except at
sides, in April 1932; Duwamish Waterway, below First Avenue
South, 30 feet; First to Eighth Avenue, 20 feet; Eighth to Four-
teenth Avenues, 15 feet; and above Fourteenth Avenue, 11 feet except
in upper 400 feet where depths varied from 1.7 to 12 feet, in April
1936. Dredging by local interests of the east waterway above the
750-foot section and of the turning basin at the junction of the water-
ways is practically completed.
   The total costs and expenditures have been $170,334.74 from Fed-
eral funds and $69,332.64 from contributed funds for new work, and
$236,515.72 from Federal funds for maintenance, a total of $406,-
850.46 from Federal funds and $69,332.64 from contributed funds.
   Proposed operations.-The unexpended balance of $1,025.62 was
revoked July 1, 1937. Allotments totaling $50,000 made during July,
and August 1937, together with $10,000 transferred from waterway
connecting Port Townsend and Oak Bay, Wash., and $10,000 to be
contributed by local interests will be applied as follows:
New work: Completing the project by dredging settling basin with
  capacity for 100,000 cubic yards at upper end of Duwamish Water-
  way, by contract, May and June, 1939--______-----                      ___________ $20, 000
Maintenance dredging in Duwamish, east, and west waterways, by con-
  tract, October-December 1937----               ---------------------------          35, 000
Balance remaining      ---------------------------------------                        15, 000

          Total----           --------------------------------------------                                              70, 000
  The additional sum of $25,000, plus the remaining balance of
$15,000, can be profitably expended during the fiscal year 1939, in
maintenance dredging in Duwamish, east, and west waterways, by
contract, during May and June, 1939.
                                        Cost and financial summary
Cost of new work to June 30, 1937 ---------------------------
                                    _      ____                                                                 $170, 334. 74
Cost of maintenance to June 30, 1937---------------       ___                                                    236, 515. 72
          Total cost of permanent work to June 30, 1937---------                                                 406, 850. 46
Net total expenditures_ .... ______-                                  _______        -     ____--               1406,   850. 46
Unexpended balance June 30, 1937                                      --                                              1,025. 62
          Total amount appropriated to June 30, 1937 ______                                     ___       -1407,        876. 08

         Fiscal year ending June 30                       1933              1934         1935            1936            1937


Cost of new work-------------------------------------------------------                                 $892. 28
Cost of maintenance.....-------            --.. $25, 943. 77
                                ...---------..               ---------. $133, 705. 50                 51, 781.75..........

      Total cost.....    ..   ---..--------..........   25, 943. 77    ......--      133, 705. 50     52, 674. 03..

Total expended-------........-.---...-.-.-              26, 074. 75   ------------   133, 705. 50     52, 674. 03-
                                      --
Allotted...................................             53, 849. 19   $54, 000. 00   54, 500. 00      47, 000. 00     -$2, 500. 00

   1In   addition, $69,332.64 was expended from contributed funds.
                         RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                                                  1573
iBalance unexpended July 1, 1936______ _--------------------                                                                                   $3, 525. 62
Deductions on account of revocation of allotment------------------                                                                              2, 500. 00

              Net amount to be accounted for--__--------------------                                                                            1, 025. 62

Balance unexpended June 30, 1937________________        -        1, 025. 62
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------------------------                  50, 000. 00

      Balance availAble for fiscal year 1938---------------------                 51, 025.62
Amount that can be profitably  expended in fiscal- year    ending June 30,
                           -    - - - - - ----- --- -- - - - - - - - - - - -- - -
1939, for maintenance 2                                                          25, 000. 00
    2   Exclusive of available funds.

                                11. LAKE WASHINGTON SHIP CANAL, WASH.
  Location.-This improvement lies entirely within the city of Seattle
and extends from Puget Sound through Shilshole Bay, Salmon Bay,
Lake Union, Portage Bay, and Union Bay to deep water in Lake
Washington. (See U. S. Coast and Geodetic Survey Chart No. 6447.)
  Previous projects.-Adopted by the River and Harbor Act of Au-
gust 18, 1894, and modified by the River and Harbor Act of June 13,
1902. The cost and expenditures on the original and modified proj-
ect prior to commencement of operations under existing project in
1910 were $485,002.45, all of which was for survey and improvement
by dredging. For further details see page 2003, Annual Report for
1915.
  Existing project.-This provides for a double lock and fixed dam
with movable crest and necessary accessory works at the Narrows at
the entrance to Salmon Bay, approximately 11/4 miles from deep
water in Puget Sound; for a channel 34 feet deep at mean lower low
water and 300 feet wide from Puget Sound to the Great Northern
Railway bridge, about 5,500 feet, with a passing basin and log basin
at the turn below the railway bridge; thence 34 feet deep and 150
to 200 feet wide to the locks, about 900 feet; and a guide pier 600
feet long; for the revetment of the canal banks between the locks and
Lake Union and between Lakes Union and Washington; and for
a channel 30 feet deep with a width of 100 feet from the locks to
Lake Union, 200 feet thence to Portage Cut, 100 feet through Portage
Cut, and thence 200 feet wide through Union Bay to Lake Wash-
ington.
   The following table shows the principal features of the double
lock and dam. (The structures are located at Seattle, Wash.)

                                                                                                                                  Large lock     Small lock


Miles above mouth                                                                                                                         11---------------------------------------------
                                                                                                                                                             1)
Clear width of chamber ____
                        ----..                            ____-------                __--------------__________   ....   feet__          80                 30
Maximum available length .                               ------------------------------------ do---                                     760               123
Lift ......-----------    ------------------------------------------------------..                                       do              26                  26
Depth on         upper miter sill 1             __----__---___-__                                              -_-____-do--              36                  16
Depth on                                        2..      ...       .....
                 intermediate miter sill___________________________________   ...         .......         ...     .do__                 29
Depth on         lower miter sill 2--...........              .. ....        .      .....                .....      .do.__              29               16
Character         of foundation ......-------------..............---------------------................----------.....                 Clay             Clay
                                                             -------------------
Kind of dam ...---.....--..----- -----.........-.-----.................         (3)                                                                   (3)
Type of construction...--------------------------------------------------(4)                                                                          (4)
Year completed ------------------------------------------------------              1916                                                                1916
'Cost...----------------------------- ---------------------------------------    ()                                                                    (5)

   1Low water    in upper pool.
   U Mean  lower low water in Puget Sound.
   $ Fixed dam with movable crest.
   ' Concrete.
   I The cost of double lock and dam was $2,224,712 and the emergency gates, completed in 1923, $174,698.31.
1574    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The length of section included in this project is about 8 miles. The
extreme tidal range is 19 feet. The range between mean lower low
water and mean higher high water is 11.3 feet, and between mean
lower low water and extreme low water is 4 feet. The ordinary fluc-
tuation in the upper pool is approximately 16 inches and the extreme
fluctuation is 2 feet.
   The estimate of cost of new work, revised in 1935, was $3,555,000,
exclusive of amounts expended on previous projects. The estimate
of annual cost of operation and care of the canal and locks, made
in 1936, is $95,000. No approved estimate for annual maintenance
of the entire project has been made.
   The existing project was adopted by river and harbor acts or au-
thorized by the Public Works Administration as follows: The act of
June 25, 1910, as modified by the act of March 4, 1913, provided for
a double lock and fixed dam with movable crest and necessary acces-
sory works at the entrance to Salmon Bay, the dredging of a channel
from the locks to deep water in Puget Sound, and excavation by
local interests of a channel from the locks into Lake Washington
 (H. Doc. No. 953, 60th Cong., 1st sess.) ; the act of August 8, 1917,
provided for dredging below the locks and revetting canal banks
 (H. Doc. No. 800, 64th Cong., 1st sess.); the act of September 22,
1922, provided for increased dimensions of the channel between
Puget Sound and the locks and a 600-foot extension of the lower
guide pier (H. Doc. No. 324, 67th Cong., 2d sess.); and the enlarge-
ment of the channel between the locks and Lake Washington was
authorized by the Public Works Administration September 6, 1933,
and the River and Harbor Act approved August 30, 1935 (H. Doc.
No. 140, 72d Cong., 1st sess.). Operation and care of the canal and
locks were included in the project July 1, 1935, under the provisions
of the Permanent Appropriations Repeal Act approved June 26,
1934. The latest published map is in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-In Salmon Bay, one wharf is Government
owned and three are municipally owned; two of the latter are open
to public use. Of 11 privately owned wharves, 1 only is open to
public use. In Lake Union, three wharves are publicly owned and
are open to public use. Of 26 privately owned wharves, 1 only is
open to public use.
   Lake Washington has four wharves owned by the county which
are open to public use and five private wharves.
   These facilities are considered adequate for existing commerce.
 (For further details see Port Series No. 7, pt. 1, Corps of Engineers.)
   Operations and results during fiscal year.-The locks were operated
throughout the year, and the necessary repairs were made thereto and
to the appurtenant structures, all work being done by hired labor.
The cost was $93,294.58, all for operation and care. The expenditures
were $94,540.63. In addition, costs and expenditures of $3,470 were
incurred under the permanent indefinite appropriation act due to
settlement of old claim.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934 at a saving of $15,705 under the estimated cost. The
water from the locks into Lake Washington is nontidal and is main-
tained at mean elevation of 21 feet above mean lower low tide of
                  RIVERS AND HARBORS--SEATTLE, WASH., DISTRICT                                                1575
Puget Sound, with a maximum variation of 2 feet. The controlling
depths when last ascertained were as follows: Below the locks, 33
feet in 1933; locks to Lake Union, 30 feet in 1933; Lake Union to
Lake Washington, 30 feet, December 29, 1934.
  The costs have been $3,539,294.87 for new work including $192,-
516.44 Public Works funds, and $290,203.39 for maintenance, includ-
ing $181,824.01 for operation and care, a total of $3,829,498.26. The
total expenditures have been $3,826,444.03.
  In addition the sum of $1,631,195.33 was expended between 1916
and 1936 on the operating and care of the works of improvement,
under the provision of the permanent indefinite appropriation for
such purposes.
   In addition, there was expended by the State of Washington
$246,567.07 and by King County $742,070.51 in the excavation of the
channel above the locks and in the construction of concrete revetment
at the portage.
  Proposed operations.-The funds unexpended June 30, 1937, $16,-
230.22, together with an allotment of $100,000 made during July
1937, will be applied to operation and maintenance, as follows:
Accounts payable June 30, 1937----------------------------------     $3, 054. 23
Operation of locks, dams, and similar works -- _----     _-----      62, 000. 00
Ordinary maintenance and repairs------------------------------- 25, 800. 00
Improvement and reconstruction __--.____          --- _____     -_ -14, 200. 00
Channel work ------------------------         _,_                     7, 000. 00
Emergencies-----------------                                          4,175.99

           Total                                                                                        116, 230. 22

  The additional sum of $105,000 can be profitably expended during
the fiscal year 1939 for operation and maintenance, as follows:
Operation of locks, dams, and similar works------------------------  $62, 000
Ordinary maintenance and repairs_ .....   ____       ___----____ ---  25, 000
Improvement and reconstruction-------------------------------------    8,000
Channel work                                                                                                    , 000
                                                                                                               6----------------------
Emergencies ------------------                                                 __4,                               000

           Total                                                                                                  000
                                                                                                            1---------------------------
                                         Cost and f/nancial summary
Cost of new work to June 30, 1937___________________________ 1$4, 024, 297. 32
Cost of maintenance to June 30, 1937-------------------------  1, 921, 398. 72
      Total cost of permanent work to June 30, 1937            5, 945, 696. 04----------
Minus accounts payable June 30, 1937-------------------------       3,054. 23
      Net total expenditures-------------------------------12 5, 942, 641. 81
Unexpended balance June 30, 1937_________________________          16,230.22
      Total amount appropriated to June 30, 1937------------ 125,958, 872. 03

           Fiscal year ending June 30              1933            1934          1935           1936          1937


Cost of new work .-------         ----------- ------------ $167, 678. 17      $24,838. 27
Cost of maintenance-___------------------       $80, 315. 31 84, 505. 80      120,113. 32    $89, 297. 85   $96, 764. 58
        Total cost---- __ -------------------    80, 315. 31   252, 183. 97   144, 951. 59    89, 297. 85    96, 764. 58
Total expended__
               -----------------------           86, 129. 09   245, 019. 08   148, 225. 31    87, 171. 11    98,010. 63
Allotted_-- --------------------------           95, 326. 69   297, 419.18    176,500. 00    103, 177. 52   -1, 249. 37

   1Includes $192,516.44 expended from Public Works funds.
   * Includes $1,631,195.33 under provision of permanent indefinite appropriation.
1576       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936                                              $115, 490. 22
Deductions on account of revocation of allotment (permanent
  indefinite appropriation) -----------------------------------                 1, 249. 37

      Net amount to be accounted for-------------------------                114, 240. 85
Gross amount expended ----------------------          $98, 840. 66
Less-
    Reimbursements collected-----------      $192. 88
    Receipts from sales-----------------      637. 15
                                                           830. 03
                                                                               98, 010. 63
      Balance unexpended June 30, 1937---------------------                   16, 230. 22
Outstanding liabilities June 30, 1937 _______________-------__                 4, 476. 61
     Balance available June 30, 1937---------- ----- ---------                 11, 753. 61
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------                   100, 000. 0
     Balance available for fiscal year 1938_ .. ____           ______---     111, 753.61
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance ---------------------------- _           _   105, 000: 00
  * Exclusive of available funds.

         12. EVERETT HARBOR AND SNOHOMISH RIVER, WASH.

   Location.-Everett Harbor is located on Port Gardner Bay, at the
northern end of Possession Sound, an arm of Puget Sound, 30 miles
north of Seattle and 45 miles south of Bellingham. (See U. S. Coast
and Geodetic Survey Chart No. 6448.)
   Previous projects.-Adopted by the River and Harbor Act of
August 18, 1894, and modified April 23, 1902 (joint resolution of
Congress), and by River and Harbor Act of March 3, 1905. The cost
and expenditures prior to the adoption of the existing project in 1910
were $418,209.14 for new work and $5,868.63 for maintenance, a total
of $424,077.77. For further details, see page 2005 of annual report
for 1915.
   Existing project.--This provides for a training dike with gap of
such width as may prove advisable at the outlet of the Old River
Channel; for raising 6,000 feet of the existing dike or bulkhead in
Everett Harbor to an elevation of 14 feet above mean lower low water;
for extending the spur dike on the south side of the gap eastwardly
to the pierhead line; for maintaining to a depth of 30 feet, at mean
lower low water, the channel designated as east waterway in Everett
Harbor, which is to be dredged to 30 feet by local interests, to the east
of the proposed municipal dike and fill; for maintaining a channel
approximately 100 feet wide between deep water in Everett Harbor
and the gap in the dike to a depth of not exceeding 8 feet; the con-
struction of closing dikes and mattress sills across subsidiary sloughs,
of the main river.
   The length of improvement under this project is 2.5 miles. The
extreme tidal range is 18 feet. The range between mean lower low
water and mean higher high water is 11.3 feet.
   The estimate of cost for new work, revised in 1930, was $368,400,
exclusive of amounts expended under previous projects. The latest
(1930) approved estimate of annual cost of maintenance of the east
waterway and the channel to the gap is $5,500. No estimate has been
made for maintenance of dikes.
                    RIVERS AND HARBORS--SEATTLE, WASH., DISTRICT                                             1577
   The existing project was adopted by the River and Harbor Act of
June 25, 1910, and provided for the training dike and a channel in
Old River Channel to the head of Steamboat Slough, 8 feet deep and
75 feet wide (H. Doec. No. 1108, 60th Cong., 2d sess.), and the present
channel dimensions and other features of the project were authorized
by the River and Harbor Act of July 3, 1930 (H. Doc. No. 377, 71st
Cong., 2d sess.). The latest published maps are in House Document
No. 649, Sixty-third Congress, second session, and House Document
No. 377, Seventy-first Congress, second session.
   Terminal facilities.-There are 19 piers and wharves at Everett, 10
being located on the deep-water harbor and the remainder on Sno-
homish River. On the harbor, two terminals do an overseas business
and one serves local traffic, all three being open to the public on equal
terms. On Snohomish. River there are nine sawmill wharves. These
facilities are considered adequate for existing commerce. (For fur-
ther details see Port Series No. 7, p. 3, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1931. A resurvey completed July 22, 1937, showed that the channel
southward of the opening in the dike to Port Gardner Bay, which was
dredged to 8 feet in 1931, had a controlling depth of 2 feet at mean
lower low water, but a depth of 2.5 feet existed in a crooked, natural
channel as far up as the Great Northern Railway bridge. The con-
trolling depth through the opening in the dike and westward over the
tide flats to the Sound was about 1 foot above mean lower low water.
A controlling depth of 1 foot at mean lower low water in the old
river channel was ascertained in 1932. Dredging of the east water-
way by local interests is practically completed. The costs and ex-
penditures have been $310,246.15 for new work and $81,410.96 for
maintenance, a total of $391,657.11.
  Proposed operations.-An allotment of $24,000, made during July
1937, will be applied to maintenance dredging in Everett Harbor, by
contract, during November and December 1937.
  The sum of $15,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging by contract in Everett Harbor
to prevent encroachment of material into east waterway.
                                                    Cost and financial summary
Cost of new work to June 30, 1937__--__--            -_________________
                                                                $728, 455. 29
Cost of maintenance to June 30, 1937---------------------------   87, 279. 59
      Total cost of permanent work to June 30, t937 ------------ 815, 734. 88
Net total expenditures--- --    ____-__--- --      ____-         815, 734. 88
Total amount appropriated to June 30, 1937-__-________-_____-    815, 734.88

            Fiscal year ending June 30                              1933              1934     1935   1936   1937


Cost of new work..-.
Cost of maintenance------------------....................
                                                                     -i,
                                                                  $1,213.41
                                                                           :   ...                                  .

Total expended....------------------------                         1,747.34
Allotted-------------------------                           .------- -66.72      -----.-.    -----.
1578       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------$24, 000. 00
Amount available for fiscal year 1938------------------------  24, 000.00

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance--------------------------------            15, 000. 00
                        13. SWINOMISH SLOUGH, WASH.

  Location.-This is an inland passage, 11 miles long between Sara-
toga Passage and Padilla Bay, in the northwestern part of the State
of Washington, about 60 miles north of Seattle. (See U. S. Coast
and Geodetic Survey Charts Nos. 6300 and 6380.)
  Existing project.-This provides for a channel 100 feet wide and
12 feet deep at mean lower low water from deep water in Saratoga
Passage to deep water in Padilla Bay, a distance of 11 miles, by
dredging and dike construction where necessary. The extreme tidal
range is 19 feet. The range between mean lower low water and mean
higher high water is 11.5 feet.
   The estimate of cost for new work, revised in 1935, was $390,000.
The latest (1935) approved estimate for annual cost of maintenance
is $16,000.
   The existing project was adopted by the River and Harbor Act of
July 13, 1892, and provided for a channel 4 feet deep and 100 feet
wide, and dike construction (H. Doc. No. 31, 52d Cong., 1st sess., and
Annual Report for 1892, p. 2752), and the 12-foot depth was author-
ized by the River and Harbor Act of August 30, 1935 (Senate com-
mittee print, 73d Cong., 1st sess.). For latest published map see
House Document No. 860, Sixty-third Congress, second session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There is one wharf at La Conner. It is
open to general public use and is considered adequate for existing
commerce.
   Operations and results during fiscal year.-The channel was
dredged to project dimensions by removing 2,487,047.6 cubic yards
under contract, and 467 cubic yards by hired labor and Government
plant, August 7, 1936, to March 31, 1937. The total costs and expend-
itures were $225,993.84, all for new work.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937. A resurvey of the project was made in June 1937.
Shoaling has occurred in the southern portion of the channel between
Saratoga Passage and the "Hole in the Wall." A limiting depth of
11/2 feet obtains through the "Hole in the Wall." The costs and
expenditures have been $409,029.51 for new work and $44,279.07 for
maintenance, a total of $453,308.58.
  Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1938.
   The sum of $16,000 can be profitably expended during the fiscal
year 1939 for maintenance work, by contract, during July and August
1938.
                              Cost and financial summary
Cost of new work to June 30, 1937_ --------------------------       $409, 029. 51
Cost of maintenance to June 30, 1937_                                 44, 279. 07

       Total cost of permanent work to June 30, 1937---         -453,     308. 58
Net total expenditures--------      -    -          -_               453, 308. 58
Total amount appropriated to June 30, 1937---------               -- 453, 308. 58
                 RIVERS AND HARBORS-SEATTLE; WASH., DISTRICT                                                                1579

           Fiscal year ending June 30                       1933           1934           1935                 1936         1937


                                                  ............-------.........
Cost of new work----------------................-----........------------               ---------               $6. 16   $225, 993. 84
Cost of maintenance....------------------- -----------------------------------                         -----------       -----------
Total expended-.................-----------      --------              -------------------           ---....     6.16     225, 993.84
Allotted---..............---------....--           .................----------........------------      207, 000. 00       19, 000. 00



Balance unexpended July 1, 1936---- -------     ------------     $206, 993.84
Amount allotted from War Department Appropriation
Act approved April 9, 1935_------------------------ $2, 500. 00
Amount allotted from ..War Department Appropriation
Act approved May 15, 1936------------------------- 16, 500. 00
                                                                   19, 000. 00
      Amount to be accounted for------------------------------ 225,993. 84
Gross amount expended_.._______________     ________-             225, 993.84
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance------------------------------------- 16, 000. 00

                                       14. ANACORTES HARBOR, WASH.

   Location.-Anacortes Harbor is on the northern point of Fidalgo
Island in Puget Sound, 17 miles south of Bellingham, Wash., and 64
miles north of Seattle. The main harbor is on Guemes Channel on
the north. (See U. S. Coast and Geodetic Survey Chart No. 6377.),
   Existing project.-This provides for a channel in Cap Sante
Waterway, 12 feet deep at mean lower low water and 150 to 250
feet wide, between the east side of Q Avenue and deep water in
Fidalgo Bay, a distance of 2,850 feet. The range between mean
lower low water and mean higher high water is 8.2 feet.
   The estimate of cost for new work, revised in 1927, was $72,000 for
that portion between the east side of R Avenue and deep water in
Fidalgo Bay, a distance of 2,460 feet, of which amount local interests:
were required to contribute $24,000. No approved estimate for an-
nual maintenance has been made.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919. (H. Doc. 1117, 64th Cong., 1st sess.). This document
contains the latest map of the locality.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The port of Anacortes has constructed on
Cap Sante Waterway a terminal for use of Puget Sound traffic and
deep-sea fishing fleets.
   The terminals on Guemes Channel are privately owned except one
which is owned and operated by the port commission. They are
open to all water carriers, subject to wharfage charges. The ter-
minals have railroad connections. These facilities are considered
adequate for existing commerce on the main harbor.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1930, except that portion of Cap Sante Waterway west of
R Avenue which was omitted at the request of local interests. A
survey in June 1937 indicated that Cap Sante Waterway had shoaled
to 91/2 feet and that portions of the turning basin had shoaled to 9
feet, the total shoaling amounting to about 27,000 cubic yards. The
total costs and expenditures on the existing project have been $46,-
1580       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

376.90 from Federal funds and $23,188.45 from contributed funds, a
total of $69,565.35, all for new work.
  Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1938.
  The sum of $12,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging in Cap Sante Waterway during
September 1938.
                            Cost and financial summary

Cost of new work to June 30, 1937            _---------                       $46, 376. 90
                                                                   -.---------------
Cost of maintenance to June 30, 1937---------------------              --------

      Total cost of permanent work to June 30, 1937-------------            46, 376. 90
Net total expenditures-------------------------------------------           46,376. 90
Total amount appropriated to June 30, 1937 ---------------------            46,376. 90
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance------------------------------------              12, 000.00
  1 In addition, $23,188.45 was expended from contributed funds.

                      15. BELLINGHAM HARBOR, WASH.

   Location.-This harbor is a part of Bellingham Bay, an arm of
Puget Sound, about 18 miles south of the international boundary and
about 100 miles north of Seattle. (See U. S. Coast and Geodetic
Survey Chart No. 6378.)
  Previous projects.-Adopted by the River and Harbor Act of June
13, 1902. The cost and expenditures on this project prior to the
adoption of the existing project in 1910 w'ere $56,581.93 for new
work and $1,092.05 for maintenance, a total of $57,673.98. For
further details see page 2006 of Annual Report for 1915.
   Existing project.-This provides for (a) dredging a channel
known as the Whatcom Creek waterway from deep water to the head
of the harbor, 363.2 feet wide, 26 feet deep at mean lower low water
for the outer 3,800 feet and 18 feet deep for the inner 1,300 feet; (b)
for Squalicum Creek waterway, including dredging an entrance
channel, 200 feet wide and 26 feet deep from deep water in the bay
to the main pierhead line, maintenance of the southerly half and
westerly end of the Squalicum Creek Basin to a depth of 26 feet at
mean lower low water, and maintenance of the present 1,500-foot
breakwater southwest of the basin to a crest height of 14 feet, pro-
vided that no dredging be done within 75 feet of wharves, piers, or
similar structures. The extreme tidal range is 16.5 feet. The range
between mean lower low water and mean higher high wafer is 8.5
feet.
   The estimate of cost for new work revised in 1913, was $81,782 for
Whatcom Creek waterway and $25,000 (made in 1927) for Squalicum
Creek waterway, exclusive of amount expended on previous project.
The latest annroved estimate for annual cost of maintenance is $2,000
(1928) for Whatcom Creek waterway, and $2,500 (1937) for Squali-
cum Creek waterway.
  The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for Whatcom Creek
waterway (H. Doc. 1161. 60th Cong., 2d sess.); the act of July 3.
1930 (H. Doc. 187, 70th Cong., 1st sess.), provided for the entrance
channel in Squalicum Creek waterway, and the act of August 26,
                   RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                             1581

1937 (Rivers and Harbors Committee Doc. 70, 74th Cong., 1st sess.)
provided for maintenance of the southerly half and westerly end of
Squalicum Creek Basin and for maintenance of the breakwater
southwest of the basin. The latest published map of Whatcom Creek
waterway is in the first-named document, and of Squalicum Creek
waterway in the last.
   Local cooperation.-Fully complied with.
    Terminal facilities.-There are 20 wharves and piers in Belling-
ham Harbor, 7 of which are on Whatcom Creek waterway, 3 on
Squalicum Creek waterway, and 10 on Bellingham Bay. One pub-
licly and two privately owned terminals on Whatcom Creek water-
way are open for public use. The three terminals on Squalicum
Creek waterway are publicly owned and privately operated, one of
them being open to public use for mooring and servicing small craft.
All of the remaining terminals are privately owned and used for
industrial purposes. These facilities are considered adequate for
existing commerce. (For further details see Port Series No. 7, pt. 3,
Corps of Engineers.)
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The dredging of Whatcom Creek waterway was
completed in 1913. The dredging of the entrance channel in Squali-
cum Creek waterway was completed in 1931, and local interests have
since dredged the southerly half and westerly end of Squalicum
Creek Basin and constructed a detached rubble breakwater 1,500 feet
long southwest of the basin. A survey in April 1937 showed a con-
trolling depth of 26 feet in the outer portion of Whatcom Creek
waterway and 20 feet in the inner portion except close to the wharves
and at the extreme upper end; the project depth was available in the
entrance channel in Squalicum Creek waterway.
    The costs and expenditures have been $112,013.16 for new work
and $51,624.31 fqr maintenance, a total of $163,637.47.
    Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1938.
    The sum of $10,000 can be profitably expended during the fiscal
year 1939 for repairs to breakwater, by contract, during September
1938.
                                                   Cost and financial summary
'Cost of new work to June 30, 1937_--__-________                                                       ___       $168, 595.09
Cost of maintenance to June 30, 1937        ----------------                                                      52, 716. 36
      Total cost of permanent work to June 30, 1937------------221, 311.45
Net total expenditures--     -------------------------------    221, 311.45
Total amount appropriated to June 30, 1937-------__    ________ 221, 311.45

            Fiscal year ending June 30                            1933         1934          1935        1936              1937

Cost of new work------------         -------
Cost of maintenance.--------------------$2,103.30                           ---------     _--------      $20, 525-_____
Total expended--------------.....................----------...   2, 103. 30 ------------------------         20, 525. --
Allotted -..---             ------------------- _                1,780.29      $20, 000       $1,000          -475


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance.---- ----   --------------        -    $10, 000. 00
1582            REPORT OF CHIEF OF ENGINEERS, U. S, ARMY, 1937

                                 16. KETCHIKAN HARBOR, ALASKA

   Location.-Ketchikan Harbor is located on the coast of Revilla-
gigedo Island and on the northeasterly side of Tongass Narrows.
The harbor is approximately 98 miles northwest of Prince Rupert,
British Columbia, and 102 miles southwest of Wrangell, Alaska.
Juneau, Alaska, is 276 miles to the northwest. (See U. S. Coast and
Geodetic Survey Charts Nos. 8075 and 8094.)
   Ewisting project.-This provides for the construction of a stone
breakwater, with concrete cap, 940 feet in length, to protect that
portion of the harbor in the vicinity of Ketchikan Creek, and for
dredging the protected area to an average depth of 10 feet at mean
lower low water. The mean range of tide is 13 feet.
   The estimate of cost for new work, made in 1927, was $272,000.
Maintenance is expected to be merely nominal for many years.
   The existing project was authorized by the River and Harbor Act
approved July 3, 1930 (H. Doc. 113, 70th Cong., 1st sess.). The lat-
est published map is in the project document.
   Terminal facilities.-There is approximately 1 mile of developed
waterfront, along which numerous wharves have been constructed
for the accommodation of deep-sea vessels. These facilities are pri-
vately owned, but are open to public use upon payment of wharfage
charges.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1933 at a saving of $47,054 under the estimated cost. A
survey in May 1937 showed a controlling depth 9 feet except in an
area about one-fifth acre in extent at the mouth of Ketchikan Creek
where depths vary from 4 to 9 feet. The total costs and expendi-
tures have been $224,945.84, all for new work.
   Proposed operations-No funds are available, and no operations
are proposed during the fiscal year 1938.
   The sum of $8,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging or repairs to breakwater, by
hired labor, July to September 1938.
                                           Cost and financial summary

Cost of new work to June 30, 1937__________________________                                     224,945.84
Cost of maintenance to June 30, 1937-----

      Total cost of permanent work to June 30, 1937_________                                    224, 945. 84
Net total expenditures--------------    ------                                                  224, 945. 84
Total amount appropriated to June 30, 1937_____________________                                 224, 945. 84

          Fiscal year ending June 30                          1933         1934   1935   1936        1937

Cost of new work------------------------$5,233.63
Cost of maintenance------        ------------------------------------------------------
Total expended..                                              5, 177. 63
                       ...................-----------------------
Allotted------...........-----------------------            5,233.63...--.........


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance     _______ __-------                                                $8, 000. 00
         RIVERS AND HARBORS-SEATTLE,             WASH., DISTRICT      1583
                           17. DRY PASS, ALASKA

   Location.-Dry Pass is a 21/2-mile section of a natural waterway
between Kosciusko and Prince of Wales Island, in southeastern
Alaska. It is part of the small-boat trade route through south-
eastern Alaska, 70 miles west of Wrangell and 230 miles southwest
of Juneau, Alaska. (See U. S. Coast and Geodetic Survey Chart
No. 8172.)
   Existing project.-This provides for the dredging of a channel 60
feet wide and 6 feet deep at mean lower low water through 5 shoals
in the waterway between El Capitan Passage and Shakan Strait.
The tidal range between mean lower low water and mean higher
high water is approximately 11.7 feet and the maximum range is
about 13 feet.
   The estimate of cost for new work, made in 1928, is $79,000, with
maintenance estimated at $1,600 for the first year following com-
pletion and $800 annually thereafter.
   The existing project was adopted by the River and Harbor Act of
August'30, 1935 (H. Doc. 470, 70th Cong., 2d sess.). This document
contains the latest published map of the locality.
   Terminal facilities.-The improvement forms a part of an existing
trade route. There are no terminal facilities within the limits of
the improvement.
   Operation and results during fiscal year.-Survey was made, and
specifications for dredging were prepared and bids invited. No costs
or expenditures were charged to this project.
   Condition at end of fiscal year.-No construction work has been
done under this project.
   Proposed operations.-An allotment of $79,000, made during July
1937 will be applied to new work, completing the project by dredging
and rock removal under contract, August to October 1937.
   No additional funds can be profitably expended during the fiscal
year 1939, as no material shoaling is anticipated.
                           Cost and financial summary

Cost of new work to June 30, 1937      ----
Cost of maintenance to June 30, 1937_______-________------__

Net total expenditures.                                           ----------
      Total amount appropriated to June 30, 1937
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937----------------------------------------- $79, 000. 00
Amount available for fiscal year 1938----------------      _     79, 000. 00

                    18. WRANGELL HARBOR, ALASKA

  Location.-Wrangell Harbor is located on the west side of the
northern end of Wrangell Island, 824 miles from Seattle and 160
miles from Juneau. (See U. S. Coast and Geodetic Survey Chart
No. 8164.)
  Existing project.-This provides for the construction of a rubble
mound breakwater 300 feet long to protect the southern portion
of the harbor, and the dredging of a mooring basin 600 feet long,
400 feet wide, and 10 feet deep below mean lower low water within
the protected area. The range between mean lower low water and
mean higher high water is 16.2 feet. The extreme tidal range is 24.8
      20196-37-pt. 1-100
1.584      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

feet. Heavy swells dangerous to small fishing boats are caused by
the wind, which causes an additional rise of about 1 foot.
   The estimate of cost for new work, revised in 1935, was $93,321.
The latest (1935) approved estimate for annual cost of maintenance
is $500.
   The existing project was adopted by the following river and har-
bor acts: The act of September 22, 1922, provided for the breakwater
 (H. Doc. No. 161, 67th Cong., 2d sess.), and the act of August 30,
1935, provided for the mooring basin (H. Doc. No. 202, 72d Cong.,
1st sess.). The latest published maps are in the project documents.
   Terminal facilities.-Terminal facilities consist of two commercial
wharves, a cannery wharf, and a sawmill wharf. All are open-pile
structures. The commercial wharves are privately owned but are
open to public use on payment of wharfage charges. The westerly
one has ample depths for deep-draft vessels. Four municipally
owned floats are also available. Terminal facilities are considered
adequate for existing commerce.
    Operations and results during fiscql year.-The dredging of the
mooring basin was completed by removing 77,537.54 cubic yards
under contract July 30 to September 25, 1936, at a cost of $53,182.54,
all for new work. The expenditures were $53,506.04.
    Condition at end of fiscal year.--The existing project was com-
pleted in 1936. The project depth is available. The costs and ex-
penditures have been $91,020.98 for new work and $167.43 for main-
tenance, a total of $91,188.41.
   Proposed operations.-No funds are available, and no operations
are proposed during the fiscal years 1938 and 1939, as project depths
are available.
                                     Cost and financial summary
Cost of new work to June 30, 1937----------------------------$91, 020. 98
Cost of maintenance to June 30, 1937----------------------------  167. 43
      Total cost of permanent work to June 30, 1937-------------91,188. 41
Net total expenditures-------------------------------------       91, 188. 41
Total amount appropriated to June 30. 1937-------------------     91.188. 41


        Fiscal year ending June 30            1933       1934        1935         1936            1937


Cost ofnew work----        ------------------------------------------------       $517.12       $53,182.54
Cost ofmaintenance-....               -----------.........
                          ---------------         ---........................                   --........
Total expended.......-----------------------------------------------------         193. 62       53, 506. 04
Allotted---------          -----------...------------ ------------ ----------   56, 000. 00     -2, 300. 34




Balance unexpended July 1, 1936------------  ------------------- $55, 806. 38
Deductions on account of revocation of allotment-----------------  2,300. 34

      Net amount to be accounted for------------------------                                  53, 506. 04
Gross amount expended------------------------------------                                     53, 506. 04

                              19. STIKINE RIVER, ALASKA

  Location.-Stikine River rises in northwestern Canada and flows
in a southwesterly direction through Canada for about 200 miles,
then approximately 30 miles westerly across the Panhandle of Alaska
             RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                       1585
to Sumner Strait. The mouth of the river is on the coast of the
mainland approximately 3 miles north of Wrangell. (See U. S. Coast
and Geodetic Survey Chart No. 8002.)
   Existing project.-This provides for snagging of the Stikine River
from its mouth to the Canadian border, a distance of approximately
30 miles.    Snagging operations must be performed in the early
spring immediately after the break-up in order to facilitate naviga-
tion.
   There are no data available concerning the stages of high and low
water in the river. At the mouth the tidal range between mean
lower low water and mean higher high water is 16.2 feet, and the
maximum range is about 24.8 feet.
   The estimate of cost, made in 1932, is $600 annually for mainte-
nance.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 210, 72d Cong., 1st sess.). This
document contains the latest published map of the locality.
   Terminal facilities.-There are no terminal facilities along the
American portion of the river. Boats operating on the Stikine River
run out of Wrangell, Alaska, and use the terminal facilities described
for that port.
   Operations and results during fiscal year.-Contract was made for
removal of snags. The costs and expenditures were $0.72 for office
expenses and charged to maintenance.
   Condition at end of fiscal year.-No construction work has been
done under this project. The costs (undistributed) and expenditures
have been $0.72.
   Proposed operations.-The funds unexpended June 30, 1937,
 $599.28, will be applied to maintenance by removal of snags be-
tween the mouth of the river and the Canadian border, by contract,
during August 1937.
   The additional sum of $600 can be profitably expended for the same
purpose during the fiscal year 1939.
                                     Cost and financial summary

Cost of new work to June 30, 1937___
Cost of maintenance to June 30, 1937                        ___________
      Total cost of permanent work to June 30, 1937
UJndistributed costs June 30, 1937_.... ______-_____------______                                $0. 72
      Net total cost to June 30, 1937------------                                                  .72
Net total expenditures.   -----------------------------------------                               .72
Unexpended balance June 30, 1937-----------------                                     -
                                                                                      ____ -   599.28
         Total amount appropriated to June 30, 1937                   ...-----.   ____-        600. 00

         Fiscal year ending June 30             1933        1934         1935        1936      1937

Cost of new work..        ........          . .......
Cost of maintenance__                                                  ____
Total expended--- ------------------    -    -------------------------------------                $0. 72
                                                                                                       A
Allotted -           ----------------------       ----------------------------                   600.00
1586     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Amount allotted from War Department Appropriation Act approved
May 15, 1936---      ----------------------------------------- $600.,00
Gross amount expended-                                               .-------------
                                                                      72
      Balance unexpended June 30, 1937 ------------            ------    599. 28
Outstanding liabilities June 30, 1937-----------------------------       599. 28
Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance          --------------------------------------   600. 00
                   20. WRANGELL NARROWS, ALASKA

   Location.-Wrangell Narrows lies to the west of Mitkof Island,
connects Sumner Strait with Frederick Sound, and forms a part of
the inside water route from Puget Sound to southeastern Alaska.
 (See U. S. Coast and Geodetic Survey Charts Nos. 8170 and 8200.)
   Existing project.-This provides for a channel 200 feet wide on
the bottom and 21 feet deep at mean lower low water, with increased
depth in rock, and 27 feet deep at shoal no. 2; 24 feet deep and
275 feet wide at shoal no. 1, the easing of curves at shoals nos.
5, 6, 7, and 12, the removal of a rock pinnacle opposite Anchor
Point, and 5 small rock pinnacles in the towing channel.
   The extreme tidal range is about 24 feet at the northern end of
the Narrows. The range between mean lower low water and mean
higher high water is 16.4 feet at the northern end, 16.7 feet mid-
way of the Narrows, and 15.7 feet at the southern end.
   The estimate of cost for new work, revised in 1935, was $642,000.
The latest (1930) approved estimate for maintenance is $7,000 the
first year after completion of the project, $5,500 annually for the
next 5 years, and $5,000 annually thereafter.
   The original channel, 200 feet wide and 21 feet deep, with increased
depth in rock and 27 feet deep at shoal no. 2, was authorized by the
River and Harbor Act of March 3, 1925 (H. Doc. No. 179, 67th Cong.,
2d sess.). The enlargement of the channel at shoal no. 1, the easing
of curves and removal of rock pinnacles were authorized by the
Public Works Administration September 6, 1933, and by the River
and Harbor Act of August 30, 1935 (H. Doc. No. 647, 71st Cong.,
3d sess.). The latest published maps are in the project documents.
   Terminal facilities.-The terminal facilities at Petersburg, the
only port in the Narrows, consist of one cannery wharf, two oil
wharves, and also two general wharves, which are privately owned
but open to the public. These facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934. A survey of shoal 2, Petersburg Bar, made in June
1937 showed a controlling depth of approximately 23 feet.
   The total costs and expenditures were $589,707.67 for new work
including $136,736.74 from Public Works funds, and $177,679.97 for
maintenance, a total of $767,387.64.
   Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1938.
   The sum of $25,000 can be profitably expended during the fiscal
year 1939 for maintenance dredging, with Government plant and
hired labor, during November and December 1938.
               RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                           1587
                                    Cost and financial summary

Cost of new work to June 30, 1937---------------------------                                              1$589, 707. 67
,Cost of maintenance to June 30, 1937                                                                         77, 679.97
                                                                                                             1--------------------------
      Total cost of permanent work to June 30, 1937 _____--------                                       767, 387. 64
Net total expenditures-------------------------------------                                             767, 387. 64
Total amount appropriated to June 30, 1937 ---------------                                          -1767, 387.64


         Fiscal year ending June 30                 1933           1934           1935             1936              1937


'Cost of new work-----___.-__    -------------   _________      $74, 079. 50   $62, 657. 24-           -     ------------
Cost of maintenance----      _-_-_---------      $9, 243. 49    44, 659. 64
      Total cost_               .----.--    .      9, 243.49              .-----.----
                                                                118, 739.14    62, 657. 24     .   .        .
Total expended---.....----         - -
                             .----.--.               625. 92     96, 820. 28    93, 193. 67
Allotted---------------.---                - -- -62. 977. 50    145,000. 00    -7, 500.00


Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance ______________  ___________-           $25, 000. 00
   1 Includes $136,736.74 expended from Public Works funds.

                             21. PETERSBURG HARBOR, ALASKA

    Location.-Petersburg Harbor is situated inside the northern
entrance to Wrangell Narrows, on the northwesterly end of Mitkof
Island, 179 miles northwesterly from Seattle, and 107 miles south-
westerly from Juneau. (See U. S. Coast and Geodetic Survey .Chart
No. 8170.)
   Existing project.-This provides for dredging suitable approaches
with a depth of 24 feet to the existing wharves; a small boat basin
11 feet deep between the Trading Union Wharf and Citizens Wharf
to a line substantially following the present mean lower low water
line; and a short channel 40 feet wide and 8 feet deep to the south
side of the Forestry Service float. All depths are referred to mean
lower low water.
   The range between mean lower low water and mean higher high
water is 16.4 feet. The extreme range is about 24 feet.
    The estimate of cost for new work, made in 1932, is $102,000, in-
,cluding $8,000 contributed by local interests. The latest (1932)
approved estimate for maintenance is $1,500 per annum.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. No. 483, 72d Cong., 2d sess.). This docu-
ment contains the latest published map of the locality.
   Local cooperation.-Fully complied with.
    Terminal facilities.-Major terminal facilities consist of two com-
mercial wharves, a cannery dock, and two oil company docks. All
are open-pile structures. The commercial wharves and the cannery
dock are privately owned but are open to public use on payment of
wharfage charges. (See H. Doc. No. 483, 72d Cong., 2d sess.)
    Operations and results during fiscal year.-The project was com-
pleted by dredging 130,601.9 cubic yards under contract, September
28, 1936, to January 14, 1937. The costs were $87,448.62 from Fed-
eral funds and $8,000 from contributed funds, a total of $95,448.62,
all for new work. The expenditures were $87,459.87 from Federal
funds and $8,000 from contributed funds.
1588            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Condition at end of fiscal year.-The existing project was com-
pleted in 1937. The project depths are available. The costs and
expenditures have been $87,462.49 from Federal funds and $8,000,
from contributed funds, all for new work.
  Proposed operations.-The funds unexpended June 30, 1937,.
$937.51, will be applied to new work, $880 being reserved to cover a
claim for remission of liquidated damages, and the balance, $57.51,
applied to inspection costs.
  No additional funds can be profitably expended during the fiscal:
year 1939, as it is expected that project depths will be available.

                                            Cost and financial summary

Cost of new work to June 30, 1937 ___-______----_____--
                                               -                   $87, 462.49
Cost of maintenance to June 30, 1937         -------------------------------

           Total cost of permanent work to June 30, 1937------.------                                                   87, 462. 49

     Net total expenditures ___-- --                                        --                --               -_ 187, 462. 49
Unexpended balance June 30, 1937                                                                                       937. 51

           Total amount appropriated to June 30, 1937_ ..... _____..                                                 1 88, 400. 00

           Fiscal year ending June 30                        1933             1934                 1935     1936              1937


Cost of new work ....---------- -------------------------------------------      $13.87 1$87, 448. 62
Cost of maintenance-----------------    -----------------------------       ----------------------
Total expiended.................------------------......--------------
                                                               ....------------------------                     2. 62      187, 459. 87
Allotted_--             -----------------------                         ,
                                                        ----------------------- -----------               94, 000. 00      -5, 600. 00


Balance unexpended July 1, 1936---------------------------$93, 997. 38
Deductions on account of revocation of allotment _-----_-- - 5, 600. 00
      Net amount to be accounted for-------------------------88,                                                            397. 38
Gross amount expended -------------------                      $95, 459.87
Less reimbursements collected----------------                    8,000. 00
                                                                                                                        87, 459.87

    Balance unexpended June 30, 1937---------------                                                            _            937. 51
Amount covered by uncompleted contracts--_----------                                                      __                880. 00:

           Balance available June 30, 1937_---------------------                                                   -----      57.51
   1 In addition, $8,000 expended                  from contributed funds.

                                        22. SITKA HARBOR, ALASKA

  Location.-Sitka Harbor is located on Sitka Sound in southeastern
Alaska off the west shore of Baranof Island. It is about 980 miles
north of Seattle, and 230 miles westerly from Petersburg. (See U. S.
Coast and Geodetic Survey Chart No. 8244.)
  Existing project.-This provides for a channel on the easterly side
of Harbor Rock, 150 feet wide and 22 feet deep at mean lower low
water, for the removal of Indian Rock, and for dredging a small-boat
         RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                    1589
basin 10 feet deep and approximately 61/2 acres in area in Japonski
Island lagoon protected by about 1,900 feet of rock mound break-
waters.
   The range between mean lower low water and mean higher high
water is 9.9 feet. The extreme range is 15 feet.
   The estimate of cost for new work, revised in 1937, is $224,000. The
latest (1937) approved estimate for annual cost of maintenance is
$1,000. The existing project was adopted by the following river and
harbor acts: The act of August 30, 1935 (H. Doc. 59, 74th Cong.,
1st sess.), provided for the channel on the easterly side of Harbor
Rock and the removal of Indian Rock; and the act of August 26,
1937 (H. Doc. No. 268, 75th Cong., 1st sess.), provided for the small-
boat basin. These documents contain the latest published maps of the
locality.
   Local cooperation.-Underthe provisions of the River and Harbor
Act of August 26, 1937, local interests are required to furnish neces-
sary rights-of-way and quarry rights, and to agree to install adequate
terminal facilities. It is believed that these conditions will be met
when required.
   Terminal facilities.-There are six wharves in Sitka Harbor having
sufficient depths alongside for larger vessels, of which five are pri-
vately owned but are open to the public on payment of nominal
wharfage fees. The sixth is the Government wharf on Japonski
Island. In addition to these six wharves, there are numerous small
wharves and floats which provide limited accommodation for the
vessels of the fishing fleet.
   Operations and results during fiscal year.-The excavation of the
channel on the easterly side of Harbor Rock and the removal of In-
dian Rock were completed by dredging 6,415.3 cubic yards of material
and removing 3,512.45 cubic yards of rock, under contract, March 1
to May 15, 1937, at a cost of $62,729.04, all for new work. The
expenditures were $62,170.20.
   Condition at end of fiscal year.-The project is 27 percent com-
pleted. Indian Rock was removed and the channel on the easterly
side of Harbor Rock was completed in 1937, except for one isolated
boulder over which is a depth of 16 feet at mean lower low water.
The project depth is otherwise available in these sections. The costs
have been $62,729.04 and the expenditures $62,170.20, all for new work.
The work remaining to be done to complete the project is the removal
of the isolated boulder and construction of the small-boat basin.
   Proposed operations.--Of the funds unexpended June 30, 1937,
$2,000 was revoked July 1, 1937, and the balance, $829.80, together
with an allotment of $1,200 made during September 1937, will be
applied to new work, as follows:
Accounts payable June 30, 1937--------------------------------
                                                     __              $558. 84
Inspection costs------------------------------------                  270. 96
Removal of isolated boulder from the channel on the easterly side of
  Harbor Rock, by contract, during October 1937----------------- 1,200. 00

      Total        __---------------------------------------------   2, 029. 80
1590          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The additional sum of $160,000 can be profitably expended during
the fiscal year 1939 for new work, completing the project by con-
structing the small-boat basin, under contract, July-December 1938.
                                    Cost and financial summary
Cost of new work to June 30, 1937-------------------------------$62,                                                    729. 04
Cost of maintenance to June 30, 1937_
      Total cost of permanent work to June 30, 1937--------                                                   -      62, 729. 04
Minus accounts payable June 30, 1937_------------------------                                                            558. 84

     Net total expenditures___---___      ----------- ___                                             -              62, 170. 20
Unexpended balance June 30, 1937___---------------------                                                              2, 829. 80
           Total amount appropriated to June 30, 1937- -__---                                             -__--      65, 000.00

           Fiscal year ending June 30             1933             1934                1935               1936           1937


Cost of new work____        _.----------------------------------                           -------      ------ ...     $62, 729.04
Cost of maintenance-_--          ----------------------------------                                   ---------
Total expended-..--....-------      -----          ----------             ------------------------                      62, 170. 20
Allotted       -------------------------------------------------                       -             ----------         65,000.00

Amount allotted from War Department Appropriation Act approved
  May 15, 1936 -------------- ------------------------------   $65, 000. 00
Gross amount expended                   ---------------------- 62, 170. 20
           Balance unexpended June 30, 1937 ---------                              ____---___-                        2, 829. 80
Outstanding liabilities June 30, 1937                    -------                        $360. 57
Amount covered by uncompleted contracts-______________                                               198. 27
                                                                                                                         558. 84

     Balance available June 30, 1937----------------------------                                                      2, 270. 96
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937-------------------------------------------                                                       1, 200.00

           Balance available for fiscal year 1938                                                         -          13, 470. 96
Amount         (estimated) required to be appropriated for completion
   of existing project         2_____________            ___--                                                    160, 000. 00
Amount that can be profitably        expended in fiscal year ending June
                             - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - -
30, 1939, for new work                                                                                 160,000.00
SIncludes $2,000 revoked since June 30, 1937.
2Exclusive of available funds.

                                 23. JUNEAU HARBOR, ALASKA.

    Location.--Juneau Harbor is in the portion of Gastineau Channel
in front of the city of Juneau, the capital of Alaska, at the mouth of
Gold Creek. It is about 1,000 miles by water northwesterly from
Seattle and 107 miles northeasterly from Petersburg, Alaska. (See
U. S. Coast and Geodetic Survey Chart No. 8235.)
   Existing project.-This provides for a small-boat basin 111/2 acres
in area just north of the Douglas-Juneau Bridge, with a depth of 12
feet at mean lower low water, by the construction of two rock-mound
breakwaters 430 feet and 1,540 feet in length, and dredging the pro-
tected area. The range between mean lower low water and mean
higher high water is 16.2 feet. The extreme range is 231/2 feet.
    The estimate of cost for new work, made in 1937, is $232,000. There
is no approved estimate for annual maintenance which is expected to
7be nominal.
            RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                       1591
   The existing project was authorized by the River and Harbor Act
approved August 26, 1937 (H. Doc. 249, 75th Cong., 1st sess.).
   Local cooperation.--Underthe provisions of the River and Harbor
Act of August 26, 1937, local interests are required to give assurances
satisfactory to the Secretary of War that they will provide all neces-
sary terminal facilities, and it is believed that this condition will be
met when required.
   Terminal facilities.-There are seven open-pile wharves at Juneau
extending to depths of 30 to 40 feet, of which five are privately
owned but are open to the public on payment of nominal wharfage
charges. The sixth is owned by the Federal Government and is
reserved for the use of the larger vessels of the Government. These
facilities for ocean steamer commerce are adequate for existing and
prospective needs. A number of floats are maintained for the
mooring of small craft, but the available sheltered anchorages are
entirely inadequate for the many small fishing and work boats
frequenting the vicinity.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under this
project.
  Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1938.
  The sum of $232,000 can be profitably expended during the fiscal
year 1939 for new work, completing the project by dredging and
constructing breakwaters, under contract, July 1938 to June 1939.
                                    Cost and financial summary
Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion of
existing project------------------------------                  --   --   $232, 00(
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work-----------------------------------------                232, 000

                             24. CORDOVA HARBOR, ALASKA

   Location.-Cordova Harbor is on Orca Inlet, a strait near the
eastern entrance to Prince William Sound, Alaska. It is about 1,600
miles northwest of Seattle and 93 miles south of Valdez, Alaska.
 (See U. S. Coast and Geodetic Survey Charts Nos. 8525 and 8520.)
   Existing project.-This provides for a sheltered harbor for small
boats approximately 8.26 acres in area with a depth of 10 feet at
mean lower low water, protected by a north breakwater about 1,100
feet long, and a south breakwater about 1,400 feet long.
   The range between mean lower low water and mean higher high
water is 12.4 feet, with an extreme range of 22 feet.
   The estimate of cost for new work, made in 1934, is $295,000.
The latest (1935) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. 33, 73d
Cong., 2d sess.). This document contains the latest published map
of the locality.
   Terminal facilities.-There are two wharves, a Government float,
and a city float. One wharf, known as the "Ocean Dock", is owned
1592     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

by the Copper River & Northwestern Railway, but is open to the
public upon payment of wharfage charges. The other wharf, known
as the "City Dock", is municipally owned and its use is free to the
public. The floats have been installed for the convenience of small
boats but are inadequate to the needs of present traffic.
   Operationsand results during fiscal year.-Specifications for break-
waters and dredging were prepared and bids received. No costs or
expenditures were charged to this project.
   Condition at end of fiscal year.-No construction work has been
done.
   Proposed operations.-An allotment of $295,000, made during July
1937, will be applied to new work, completing the project by con-
structing breakwaters and dredging, by contract, September 1937
to October 1938.
   No additional funds can be profitably expended during the fiscal
year 1939, as no immediate deterioration is anticipated.
                         Cost and financial summary

Total amount appropriated to June 30, 1937
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-------------------------------------------     $295, 000
Amount available for fiscal year 1938------------------------------295,     000

              25. HARBOR OF REFUGE, SEWARD, ALASKA

  Location.--This harbor is located at Seward, Alaska, on the west
side of the north end of Resurrection Bay. The harbor is about 130
miles west of Cordova, Alaska. (See U. S. Coast and Geodetic
Survey Chart No. 8529.)
  Existing project.-This provides for a south breakwater 580 feet
long and a north breakwater 950 feet long, and dredging a basin
about 207,000 square feet in area between the breakwaters to a depth
of 121/2 feet at mean lower low water. The range between mean lower
low water and mean higher high water is 10.6 feet. The extreme
range is about 171/2 feet.
  The estimate of cost for new work, revised in 1935, is $173,200. No
approved estimate of annual cost of maintenance has been made.
   The existing project was adopted by the following river and harbor
acts: The act of July 3, 1930, provided for the south breakwater and
the dredged basin (H. Doc. No. 109, 70th Cong., 1st sess.), and the
act of August 30, 1935, provided for the north breakwater (Rivers
and Harbors Committee Doc. No. 3, 74th Cong., 1st sess.). These
documents contain the latest maps of the locality.
   1'erminal facilities.-Docking facilities at Seward include one com-
mercial wharf, owned by the Alaska Railroad, which is available
to the use of the public on payment of the usual wharfage charges,
one wharf owned by the Standard Oil Co. and one owned by the San
Juan Cannery. These facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Specifications for con-
struction of the north breakwater were prepared and bids received.
No costs or expenditures were charged to this project.
   Condition at end of fiscal year.-The existing project is 60 percent
completed. The south breakwatar was constructed in 1931 and re-
                    RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                              1593
paired in 1934 by placing of armor rock. The basin was dredged in
1932 and the controlling depth is 12 feet at mean lower low water.
   The work remaining to be done to complete the project is the
,construction of the north breakwater.
   The costs and expenditures have been $103,202.61 for new work
and $9,198.31 for maintenance, a total of $112,400.92.
   Proposed operations.-An allotment of $65,000, made during July
1937, will be applied to new work, constructing the north breakwater,
by contract, August to December 1937, which will complete the
project.
   No additional funds can be profitably expended during the fiscal
year 1939, as no material deterioration of breakwaters or channel is
anticipated.
                                                   Cost and financial summary

Cost of new work to June 30, 1937_----------------------                                                            $103, 202. 61
Cost of maintenance to June 30, 1937-------------------------                                                          9,198. 31
      Total cost of permanent work to June 30, 1937----------- 112, 400. 92
Net total expenditures_--------------------------- --------- 112, 400. 92
Total amount appropriated to June 30, 1937 ---------------------- 112, 400. 92

           Fiscal year ending June 30                           1933               1934          1935        1936         1937


Cost of new work__-----------------------                           -$273
Cost of maintenance-------------...............----...       .. _     ..------------$9, 198.31
Total expended-----------------------.....................           -273          9, 198. 31-----------------------------
Allotted-.---- ---------.-----.--.-.                            --    273 1-10, 801. 69

Amount allotted during July 1937_ _______------_-_--_--$65, 000
Amount available for fiscal year 1938 ------------------------- 65, 000
                                               26. EGEGIK RIVER, ALASKA

   Location.--Egegik River, located on the Alaska Peninsula in south-
western Alaska, is the outlet of Becharof Lake and flows north-
westerly from the lake for a distance of about 34 miles into Bristol
Bay, 470 miles northeasterly from Dutch Harbor. (See wall map of
Alaska by the Mineral Resources Branch of the U. S. Geological
Survey.)
   Existing project.-This provides for a channel 100 feet wide, 5
feet deep, and about 2,500 feet long through the rapids at the head
of the river by the removal of obstructing boulders and the erection
of suitable ranges to mark the channel.
   The controlling depth of 4 feet at low water stage exists in the
river between its mouth and the rapids, with an average depth in
the rapids of 10 feet. The flow of the river is so well regulated by
the lake that the maximum range, except for tidal action at the
mouth, is only 2 feet.
   The estimate of cost for new work, made in 1932, is $5,000. There
is no provision for annual maintenance.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 51, 73d Cong., 1st sess.). The
latest published map is in that document.
   Terminal facilities.-Thereare no terminal facilities.
1594     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done under
this project.
  Proposed operations.-An allotment of $5,000 made during July
1937 will be applied during the fiscal year 1939 for new work, com-
pleting the project by removal of obstructing boulders and erection
of channel markers, by hired labor and Government plant, during
July and August 1938.
                       Cost and financial summary
Total amount appropriated to June 30, 1937----------------         ------
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937__-----------------------------------------$5,000
Amount available for fiscal year 1938----------------------------_      5,000

                       27. NOME HARBOR, ALASKA

   Location.-Nome Harbor is in the portion of Norton Sound in front
of the city of Nome, Alaska, at the mouth of Snake River. It is a
shallow, open roadstead about 115 miles north of the Apoon mouth
of the Yukon River and 125 miles northwest of St. Michael Harbor..
 (See U. S. Coast and Geodetic Survey Chart No. 9380.)
   Existing project.-This provides for two parallel timber and con-
crete jetties, the easterly, 951 feet long, and the westerly, not exceed-
ing 676 feet long, at the mouth of Snake River, and a channel 8 feet
deep at mean lower low water from Norton Sound, through Snake.
River, to the mouth of Bourbon and Dry Creeks, in the city of Nome,
ending in a basin of similar depth 250 feet wide and 600 feet long
and revetting the banks of the river. The length of the section in-
cluded in the project is 1,900 feet. The extreme tidal range is 2.8 feet.
The range between mean lower low water and mean higher high
water is 1.4 feet. The water levels are influenced more by wind than
tide, an offshore wind sometimes causing a level of from 2 to 3 feet
below mean lower low water for days at a time and a level of 14 feet
above mean lower low water having been noted as a result of storms.
   The estimate of cost for new work, revised in 1935, is $542,450.
The latest (1935) approved estimate for annual cost of maintenance
is $45,000 (including $2,500 to be contributed by the city of Nome and
$20,000 for annual maintenance of the authorized extension of jetties).
   The existing project was adopted by the following river and harbor
acts: The act of August 8, 1917, provided for two jetties, the easterly
335 feet and the westerly 460 feet long; revetment, channel, and basin
200 feet wide and 250 feet long (H. Doc. No. 1932, 64th Cong., 2d
sess.); and the act of August 30, 1935, provided for extending the,
jetties and basin (H. Doc. No. 404, 71st Cong., 2d sess., and Rivers
and Harbors Committee Doc. No. 38, 73d Cong., 2d sess.). The latest
published maps are in the above-mentioned documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Cargoesand passengers from ocean vessels are
lightered to and from shore, a distance of about 2 miles. There is one
privately owned wharf outside the improvement area, which is open
to the general public. Traffic using the dredged channel and basin
is handled over the revetment, where transfer facilities have been
installed by the city and lighterage companies. These facilities are
considered adequate for existing commerce.
          RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                              1595
   Operations and results during fiscal year.-Seasonal repairs to jet-
ties and revetment were made and 23,370 cubic yards dredged by
Government plant and hired labor. The costs were $41,133.69 from
Federal funds and $2,500 from contributed funds, a total of
$43,633.69, all for maintenance. The expenditures were $43,986.18
from Federal funds and $2,500 from contributed funds.
   Condition at end of fiscal year.-The project is 50 percent com-
pleted. The construction of the original 335- and 460-foot jetties and
revetment was commenced in 1919 and completed in 1923. Dredging
of the channel and the original 200- by 250-foot basin was com-
menced in 1919 and completed in 1922. The controlling depths on
June 30, 1937, were as follows: Bar, 6 feet over a width of 50 feet;
channel, 8 to 10 feet over a width of 80 feet; basin, 0 to 9 feet. The
work remaining to be done to complete the project is to construct a
616-foot extension to the east jetty and an extension of not more than
216 feet to the west jetty, and to dredge the 400-foot extension of the
basin.
   The costs from Federal funds have been $272,950.13 for new work
and $326,751.78 for maintenance, a total of $599,701.91, and the ex-
penditures $605,537.56. In addition, $37,500 has been expended from
contributed funds for maintenance.
   Proposed operations.-The Federal funds unexpended June 30,
1937, $2,509.21, together with allotments of $30,000 made during July
and August, 1937, and $2,500 contributed for maintenance, will be
applied as follows:
                     ----------------------------------------- _ $1, 050. 85
Accounts payable_______________________________
New work: Dredging part of extension to turning basin, 250 feet wide,
  250 feet long, and 8 feet deep, by Government plant and hired labor,
August-September 1938, and May--June 1939----____--        ________ 10, 000. 00
Maintenance dredging and repairs to jetties and revetment by Gov-
  ernment plant and hired labor, July-October 1937, and April-June
  1938 -----      -  --------------------------------------------      23, 958. 36
      Total ------      --------------------------------------                35, 009. 21
  The additional sum of $25,000 (including $2,500 to be contributed
for maintenance), can be profitably expended during the fiscal year
1939, to be applied to maintenance, dredging, and repairs to jetties
and revetment, by Government plant and hired labor, July-October
1938 and April-June 1939.
                             Cost and financial summary

                                  UNITED STATES FUNDS

Cost of new work to June 30, 1937-- ___-_.. ------        __     ___-$272, 950. 13
Cost of maintenance to June 30, 1937 ----------------------------     326, 751. 78
      Total cost of permanent work to June 30, 1937-------------              599, 701.91
Undistributed costs June 30, 1937                 -_7_-__-                      6, 886. 50
     Net total cost to June 30, 1937______________               ----------   606, 588. 41
Minus accounts payable June 30, 1937--------------------------                  1, 050. 85
     Net total expenditures----------____________--------__                   605, 537.56
Unexpended balance June 30, 1937                                                2, 509. 21

      Total amount appropriated to June 30, 1937-----.-----                   608, 04. 77
1596          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


         Fiscal year ending June 30                    1933            1934                1935             1936                1937

Cost of new work------------_________-- _------------
Cost of maintenance------------------ $20, 069. 19
                                                                   -----------
                                                                   $29, 611.92
                                                                              ------------------------
                                                                                       $21.629.28        $25, 357. 10
                                                                                                                        ------------
                                                                                                                           $41, 133.69
Total expended----------............................
                                       38, 545.43 35, 761. 98                            1,809.06         19, 134.30           43, 986. 18
Allotted_.-            .---.--..-- ..-------------   75, 735. 32    21, 019. 20           1,218. 40       33, 923. 72           5, 000.00

Balance unexpended July 1, 1936_.....______ __- -__      ____- - $41, 495.39
Amount allotted from War Department Appropriation Act approved
  May 15, 1936-------------------------------------------------5, 000. 00

      Amount to be accounted for--            _____       ________                                                      46, 495. 39
Gross amount expended------------------------------$47, 487. 78
Less reimbursements collected------_---... --    __--____          3,501. 60
                                                                                                                        43, 986. 18
      Balance unexpended June 30, 1.937--------------------------    2, 509. 21
Outstanding liabilities June 30, 1937-- ____________-- - -           2, 101. 87
                                                               -_______
    Balance available June 30, 1937 ----                                           -      --
                                                                                         ___-______-                     -407. 34
Amount allotted during July 1937 ------------                                                                           30, 000.00
          Balance available for fiscal year 1938_                            -                         30, 407. 34
                                                                                         -___________--_

Amount (estimated) required to be appropriated for completion of
existing project -------------------------------------------- 259, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance x_________________________________     22, 500. 00
                                                CONTRIBUTED        FUNDS


Cost of new work to June 30, 1937_
Cost of maintenance to June 30, 1937______________                                              ____          ______ $37, 530
          Total cost of permanent work to June 30, 1937----------------                                                        37, 500
Net total expenditures_____________________                                                                                    37, 500
Unexpended balance June 30, 1937-----------------------------------                                                             2, 500
          Total amount contributed to June 30, 1937---________                                                                 40, 000

          Fiscal year ending June 30                   1933           1934                 1935             1936                1937


Cost of new work.......................                            ._..      ..... .. . . ...                    ...........
Cost of maintenance_......................                            $2,500    $2,500  $2,500               $2,500               $2,500
Total expended----------------------............................       2,500     2,500   2,500                2, 500               2,500
Contributed_------.-...........                                  ._-, 2,500      2,500   2,500                2,500                2,500

Balance unexpended July 1, 1936 --   -----------------------------                                                              2, 500
Contributed by Territory of Alaska Apr. 22, 1937_-------  -   -    -                                                            2, 500
      Amount to be accounted for_--------------------------   -                                                                  5, 000
Gross amount expended----------------------------------------                                                                    2, 500
      Balance unexpended June 30, 1937_------.......-------__-                                                                   2,500
Amount that can be profitably expended in fiscal year ending June

   2
30, 1939, for maintenance 1_--
  Exclusive of available funds.
                                  -__._________________ ___------                                                                2, 500
                  RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                                          1597
         CONSOLIDATED COST AND FINANCIAL SUMMARY                                      FOR NOME HARBOR,                       ALASKA

Cost of new work to June 30, 1937- --------
Cost of maintenance to June 30, 1937___________-------
                                                                                          __           __--___$272,                    950. 13
                                                                                                                                  364, 251. 78

      Total cost of permanent work to June 30, 1937__                                                                          6-------
                                                                                                                             -637,   201. 91
Undistributed costs June 30, 1937_-    -- __ --- --------                                              __6,                          886. 50
     Net total cost to June 30, 1937_                                             __1111___                                    6____088. 41
                                                                                                                               644,
Minus accounts payable June 30, 1937__-                                                                     -                     1___________-
                                                                                                                              -___1, 050. 85

     Net total expenditures_ .---------------------                                                    __              .          643, 037. 56
Unexpended balance June 30, 19371111111                                                                                             5, 009. 21
           Total amount appropriated and contributed to June 30, 1937_                                                            648, 046. 77

           Fiscal year ending June 30                           1933           1934             1935                  1936             1937


Cost of new work ----           ...----                 ..
                                           .--- ....----------.. . . . .   .     -.. .     - -.      ..          ..        ..--       . . .
                                                                                                                                     .-
Cost of maintenance--------.....--...--------               $22, 569. 19   $32, 111. 92    $24, 129.28          $27, 857. 10         $43, 633. 69

Total expended--.-----------------------                     41, 045. 43    38, 261. 98        4, 309.06        21, 634. 30           46, 486. 18
Allotted and contributed--...--------------..............    78, 235.32     26, 019. 20        3, 718. 40        36, 423. 72           7, 500. 00


Balance unexpended July 1, 1936 ___-            --
                                             ____-   -________    ____ $43, 995.39
Amount allotted from War Department Appropriation Act
  approved May 15, 1936 ----------------------------           $5, 000
Contributed by Territory of Alaska April 22, 1937---------2, 500
                                                                         7, 500. 09
      Amount to be accounted for-------------------------------                                                                    51, 495. 39
Gross amount expended___--------_-       __-__-____-    $49, 987. 78
Less reimbursements collected- ------------- __--_        3, 501. 60
                                                                                                                                   46, 486.18

      Balance unexpended June 30, 1937-------------         -________-5,
                                                                    009. 21
Outstanding liabilities June 30, 1937---------------------------2,  101. 87
     Balance available June 30, 1937----------------------------2, 907. 34
Amount allotted during July 1937------------------------------  30, 000. 00
      Balance available for fiscal year 1938_-                            ______-______                     32, 907. 34
Amount (estimated) required to be appropriated for completion of
                  1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
existing project                                                                                          259, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1 ____-_--- --------                                                   __---     25, 000.00
    1 Exclusive of available funds.

     28. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year amounted to $67,507.12; the
expenditures were $63,867.25. The funds unexpended June 30, 1937,
amounting to $9,208.24, together with an allotment of $48,000 made
during July 1937, will be applied as needed during the fiscal year
1938 to payment of expenses to be incurred under this heading. The
additional sum of $60,000 can be profitably expended during the fiscal
year 1939.
                                                Cost and financial summary
Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937----_                                                                       _             $341, 119. 89

            Total cost of permanent work to June 30, 1937_ --------                                                               341, 119. 89
1598            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Mhinus accounts payable June 30, 1937___---------------------                                                            $3, 581. 95

     Net total expenditures _------------------_-------                                                              337, 537. 94
Unexpended balance June 30, 1937_ _-------------------------                                                           9, 208.24

           Total amount appropriated to June 30, 1937----------------                                                346. 746.18

           Fiscal year ending June 30                      1933              1934            1935            1936            1937


Cost of new work ..-         -----------------------                          --------------------                       ------------
Cost of maintenance.......------------------           $36, 926. 22    $31, 823. 34 $47, 581. 78 $41, 747. 01                      12
                                                                                                                           $67, 507.
               .....-----------------------
Total expended----                                      38, 040. 40     30, 883. 55       45, 238. 54     45, 156. 65       63, 867. 25

                              ----------------
Allotted-.....-----.....------........                  75, 775.75      40, 632. 64       44, 000.00       64, 000. 00       5, 000. 00


Balance unexpended July 1, 1936________________----------------         $68, 075. 49
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936_-- __--- -----------------          --------------- 5,000. 00

      Amount to be accounted for_-----------------                                                                       73, 075. 49
Gross amount expended----------------------------------------                                                            63, 867.25

      Balance unexpended June 30, 1937------------- --------                                                              9, 208. 24
Outstanding liabilities June 30, 1937------------------------------                                                       3, 812. 39

     Balance available June 30, 1937-----------------------------       5, 395. 85
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937        ____     ---        .-------.-- ______--
                                               ____                   48, 000. 00

      Balance available for fiscal year 1938------ ---                                                                   53, 395. 85
Amount that can be profitably expended in fiscal year ending June
                                            _
                                    -----
30, 1939, for maintenance 1--_ _________     ________--______                                                           60, 000. 00
1 Exclusive of available funds.

29. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                        [Commercial statistics for these projects are given in pt. 2 of report]

                                                                    For last        Cost and expenditures to              Estimated
                                                                   full report              June 30, 1937
                      Name of project                              see annual                                             amunt re-
                                                                     report                                                quired to
                                                                     report
                                                                      for--         New work            Maintenance        complete


1. Hoquiam River W ash.'1-..-_                    ..--------          1933            $51, 293. 64        $3. 816. 35         (2)
2. Skagit River, Wash.3.........................._                    1931              99, 829.80        29, 257. 81        $117, 000
3. Kootenai River, Idaho and Mont.'                                   1933               9, 254. 54        5, 642. 60         (2)
4. Columbia
          4 River, Wenatchee to Kettle Falls,                         1923            274 ,390 . 53        7, 692. 58         ( 2)
    Wash. _ _______ _____      __   ._______________
5. Poison Bay, Flathead Lake, Mont.1 ....  _____                      1918               4, 491.14            258. 86         (2)
6. Port Alexander, Alaska 1-.....                                     1932             17, 000.00     ---------------         (2)
7. Kodiak Harbor, Alaska a---
                           ............                        .      1935                          --------------             77, 000

  1 No maintenance required at present.
  2 Completed.
  3 Awaiting local cooperation for work on Skagit City bar; no work required on remainder of project at
present.
  4 Improvements fairly permanent and maintenance not required.
  s Awaiting local cooperation.

           30. PLANT ALLOTMENT                          FOR SEATTLE,                     WASH., DISTRICT
                                           Cost and financial summary

Undistributed costs June 30, 1937-----------------------------                                                 $1, 157, 548. 99
Plus accounts receivable June 30, 1937-----------                                                                   27, 689. 35
           Gross total costs to June 30, 1937
                                            ----------------                                                     1,185, 238. 34
                RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                  1599
Minus accounts payable June 30, 1937 ---.---                      -----           ---              $22, 755. 11

     Net total expenditures_--___- ----- ____--    _                                           1, 162, 483. 23
Unexpended balance June 30, 1937_.__  ______----_--__                                              51, 468. 41
          Total amount appropriated to June 30, 1937-------------1, 213, 951.64

          Fiscal year ending June 30          1933         1934            1935            1936              1937

Total expended---..-..                 .------------------------- $_
                                                                _$339,      174.06 $834, 601.85          -$11, 292. 68
Allotted ...... ------------------- __-----------                       375, 398.40     913, 897. 78     -75, 344. 54

Balance unexpended July 1, 1936 .....                                                             $115, 520. 27
Amount allotted from War Department                  Appropriation
Act approved April 26, 1934..       ---                          -__      $5, 364.94
Amount allotted from War Department                  Appropriation
Act approved April 9, 1935_______                   ___   ____-             4, 970. 49
Amount allotted from War Department                  Appropriation
Act approved May 15, 1936                                                151, 276. 31
                                                                                                   161, 611, 74
      Amount to be accounted for ____________277,                                                       132. 01
Deductions on account of revocation of allotments_________
                                                   --                                              236, 956. 28
      Net amount to be accounted for-------------------------                                          40, 175. 73
Gross amount expended_________    _____________-- $743, 231.54
Less-
    Reimbursements collected---------$520, 405. 64
    Receipts from sales-________- __ 1234, 118. 58
                                                   754, 524. 22
                                                                                                  -11.     22F
                                                                                                       L. , ,_RJQ. -


      Balance unexpended June 30, 1937__________-_____-                                                51, 468. 41
Outstanding liabilities June 30, 1937-                                                                 34, 529. 65

     Balance available June 30, 1937__                             ____                                16, 938. 76
Accounts receivable June 30, 1937 ..... ___                                                            27, 689. 35

     Unobligated balance available June 30, 1937___-----                                               44, 628. 11
Amount allotted from War Department Civil Appropriation Act,
approved July 19, 1937___________________                                                             25, 00. 00

        Balance available for fiscal year 1938         _                                               69, 628. 11
   1Includes sale of U. S. Dredge Culebra to Savannah (Ga.) engineer district.

                    31. PUYALLUP RIVER, WASH., FLOOD CONTROL
   Location.-The works covered by this project are in the Puyallup
River Basin within a radius of 28 miles from Tacoma, Wash.
   Existing project.-This provides (a) for a detention dam and
reservoir on White River, a tributary, near Mud Mountain; (b) for
a flood channel on the lower Puyallup through the city of Tacoma;
and (c) for bank protection on upper Puyallup River.
   The estimate of cost for new work, made in 1935, for Mud Moun-
tain dam and reservoir is $3,177,000 (estimate may have to be in-
creased to meet desires of local interests for more complete protec-
tion) for construction and $28,000 for lands and damages; for the
channel in Tacoma, $894,000 for construction and $661,000 for lands
and damages; for upper Puyallup River, $50,000 for construction
alone.
         20196---37--pt. 1-101
 1600       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The project was adopted by the Flood Control Act approved June
22, 1936.
   Local cooperation.--(See page 6.) In accordance with the pro-
visions of the Flood Control Act of June 22, 1936, the required
local cooperation for the work at Mud Mountain has been assured
by the Inter-County River Improvement Commission. No progress
has been made towards fulfilling these requirements for the channel
in Tacoma, except that Pierce County has agreed to furnish the
right-of-way for the portion outside the city. The work on the
upper Puyallup has been practically completed by the Works
Progress Administration.
   Operations and results during fiscal year.-With emergency relief
funds, survey was made of site for the proposed detention dam and
reservoir on White River near Mud Mountain. The costs were
$50,000, all for new work. The expenditures were $49,811.88.
   Condition at end of fiscal year.--No construction work has been
done by the Engineer Department, but the bank protection on the
upper Puyallup was completed by the Works Progress Administra-
tion in 1936. Topographic surveys and foundation explorations inci-
dental to the preparation of plans for the Mud Mountain Dam were
completed in 1937, with emergency-relief funds, at a cost of $50,000,
all for new work. The expenditures were $49,811.88.
   Proposed operations.-An allotment of $200,000 made during
August 1937 will be applied to new work, design only of Mud
Mountain Dam.
   The exact additional amount that can be profitably expended on
construction during the fiscal year 1939 cannot be determined until
the design of the Mud Mountain Dam has been completed and
approved. It is estimated that $1,850,000 should be provided for a
continuing contract.
   No work will be done on the lower Puyallup pending compliance
with the terms of local cooperation, which have not been met.
   No operations are proposed on the upper Puyallup, at this time,
pending results of work that has been completed by the Works
Progress Administration.
                                Cost and financial summary

Cost of new work to June 30, 1937---------------------------          $50, 000. 00
Cost of maintenance to June 30, 1937________
       Net total expenditures-------------------------------           49, 811. 88
       Total amount appropriated to June 30, 1937--------------        50, 000. 00
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------------------------200, 000. 00
Amount available for fiscal year 1938__--- -___ -___________  200, 000. 00
Amount (estimated) required to be appropriated for completion
  of existing project    2__________________                        5, 744, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939, fo rnew work 2____----________________________________ 1, 850, 000. 00
  SEmergency Relief funds, allotted fiscal year 1937.
  2 Exclusive of available funds.

          32. STILLAGUAMISH RIVER, WASH., FLOOD CONTROL

  Location.--The works covered by this project are on the Stilla-
guamish River between Arlington and the head of Hat Slough, Wash.
          RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                    1601
   Existing project.-This provides for the partial control of floods by
snagging and bank revetment on the river, and by a control at the
head of a distributary slough with two cut-off channels in same, and a
complete closure of an auxiliary distributary slough.
   The estimate of cost for new work, made in 1935, is $261,000, but
because of work already done by the Works Progress Administration
the estimate of cost of remaining work to be done is $172,000.
   The project was adopted by the Flood Control Act approved June
22, 1936. The latest published map of the vicinity is in House Doc-
ument No. 657, Seventy-first Congress, third session.
   Local cooperation.-See page 6. In accordance with the provi-
sions of the Flood Control Act of June 22, 1936, the commissioners
of Snohomish County agreed to meet all requirements by resolu-
tion adopted January 11, 1937.
   Operations and results during fiecal year.-No work was done by
the Engineer Department.
   Condition at end of fiscal year.--Work has not been started by
the Engineer Department, but during the fiscal years 1936 and 1937
the Works Progress Administration constructed in excess of 110,000
square yards of brush revetment along the river banks and a weir
at the head of a distributary slough, at cost of $281,000 from Fed-
eral funds and $21,000 from contributed funds.
   Proposed operations.-Allotments of $134,000 regular funds and
$86,000 emergency relief funds made during August 1937, will be
applied to completing the project by hired labor, August 1937 to
May 1938.
   No additional funds can be profitably expended during the fiscal
year 1939, as the project is to be maintained by local interests.
                          Cost and financial summary

Cost of new work to June 30, 1937 -----.--.--                      -           .--------
Cost of maintenance to June 30, 1937
Net total expenditures--------

     Total amount appropriated to June 30, 1937
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937           ------------------------------------- $134, 000
Amount allotted from Emergency Relief Appropriation Act approved
June 29, 1937-------------------------------------------               86, 000
      Amount available for fiscal year 1938                            2---------------------20,
                                                                             000

              33. SKAGIT RIVER, WASH., FLOOD CONTROL

  Location.-The works covered by this project are in the Skagit
River Valley between Burlington, Avon, and Padilla Bay, Wash.
  Existing project.-This provides for the partial control of floods
in the lower valley by diversion of part of the flood waters through
a bypass to be constructed between the river at Avon and Padilla
Bay, together with widening and revetting banks of river between
Burlington and Avon, also concrete control works at the head of the
bypass and a concrete weir near the outlet.
  The estimate of cost for new work is $3,150,100 for construction
and $1,832,000 for lands and damages. The project was adoptedi
by the Flood Control Act approved June 22, 1936 (H. Doc. No. 187,
1602    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

73d Cong., 2d sess.). The latest published maps are in the project
document.
   Local cooperation.-See page 6. No progress has been made by
local interests towards fulfilling these requirements.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work has not been started.
  Proposed operations.-No funds are available, and no operations
are proposed pending compliance with the terms of local cooperation.
                      Cost and financial summary
Total amount appropriated to June 30, 1937---------------------------
Amount (estimated) required to be appropriated for completion of
existing project------------,---------------------------- $3, 150,100

           34. LOWELL CREEK, ALASKA, FLOOD CONTROL

   Location.-Lowell Creek rises in the mountains west of Seward,
Alaska, and flows eastward into Resurrection Bay, an arm of the
Gulf of Alaska, at the city of Seward. Its total length is about 41/2
miles. (See U. S. Coast and Geodetic Survey Chart No. 8529.)
   Previous projects.-The original project, providing for an intake
dam and a timber flume through the city of Seward, was adopted by
Public Resolution No. 52, Sixty-ninth Congress, approved February
9, 1927. The original project was completed by the Alaska Road
Commission and provision for maintenance was made by the act ap-
proved February 14, 1933 (Public No. 336, 72d Cong.). The costs
from Federal funds have been $88,157.87 for new work and $31,-
120.38 for maintenance, a total of $119,278.25, and the total expendi-
tures have been $118,957.15. In addition, $25,000 was expended from
contributed funds for new work. For further details see page 1590
of Annual Report for 1936.
   Existing project.-This provides for the control of floods in Lowell
Creek by the construction of a diversion dam 400 feet long and a
tunnel 2,070 feet long to divert flood waters and debris away from
the city of Seward and into deep water of Resurrection Bay. The
estimate of cost for new work, made in 1937, is $197,000, exclusive of
amounts expended on the previous project, the completed works to
be maintained and operated by local interests. The project was
adopted by the act approved August 25, 1937 (Public No. 369, 75th
Cong.); (H. Doc. No. 154, 75th Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-The act approved August 25, 1937, provides
that local interests furnish, without cost to the United States, all
lands, easements, and rights-of-way necessary for the construction of
the project, hold and save the United States free from damages due
to the construction work, and agree to maintain and operate the
works after completion. Local interests have agreed to meet these
conditions when required.
   Terminal facilities.--None.
   Operations and results during fiscal year.-Under the previous
project, debris was removed from the flume and minor repairs made
thereto during July and August 1936. Removal of debris from the
flume and outfall was commenced by the Alaska Railroad in June
1937, reimbursement to be made by the Engineer Department when
                RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                                   1603
funds become available. The costs for work done by the Engineer
Department were $5,773.08, all for maintenance. The expenditures
were $7,559.90.
   Condition at end of fiscal year.-No work has been done under the
existing project. The intake system and flume constructed under the
previous project are now beyond economical repair. The flume was
clear of detritus on June 30, 1937, but the outfall was obstructed with
the material previously discharged.
   Proposed operations.-The funds unexpended June 30, 1937,
$731.72, together with an allotment of $1,000 made during September
1937, will be applied to maintenance under the previous project as
follows:
Accounts payable June 30, 1937------------------------------- $321.10
Reserved for emergency requirements during the year--------------    410. 62
Reimbursement of Alaska Railroad for removal of debris from flume
  and outfall commenced in June 1937 -----------------------      1,000. 00
           Total                 -----------------------------------                                                       1, 731. 72
    Although these structures have practically outlived their usefulness
and cannot be effectively repaired without excessive cost, it is impera-
tive that the flume be maintained as far as possible in order to lessen
flood damages until the new project providing for diversion through
a tunnel is completed. The sum of $5,000 can be profitably expended
during the fiscal year 1939 in maintaining the flume free from debris.
The additional sum of $197,000 can be profitably expended during the
fiscal year 1939 in completing the existing project by constructing the
diversion dam and tunnel, by contract, throughout the year. This
work is urgently necessary as the extent of damages resulting from
periodic floods is increasing with the progressive deterioration of the
work completed under the previous project.
                                             Cost and financial summary

Cost of new work to June 30, 1937---------------------------                                                          $88, 157. 87
Cost of maintenance to June 30, 1937-------------------------                                                          31, 120. 38
      Total cost of permanent work to June 30, 1937------------119, 278. 25
Minus accounts payable June 30, 1937------------------------        321.10'
     Net total expenditures     ____--------------                                                      -            1118, 957. 15
Unexpended balance June 30, 1937 -----------                                                                               731. 72
           Total amount appropriated to June 30, 1937________________ 1119, 688. 87

          Fiscal year ending June 30                            1933            1934           1935           1936            1937

Cost of new work.-------------------                       --------------
Cost of maintenance..................-------------------    $1,335. 72        $8, 781. 25     -$10. 89      $3, 816.30       $5, 773. 0
Total expended------------_-_                  ---     _--. -310.00            9, 593.22           202.86    1, 708. 38       7, 559. 9G
Allotted------            -----------------------           21,409.31       ------------ 8,968.95            8,000.00----------


Balance unexpended July 1, 1936-------------------------                                                                  $8, 291.62
Gross amount expended--- -----------                                            --------               $7, 560. 78
Less reimbursements collected----------------                                               ----               .88
                                                                                                                           7, 559. 90

       Balance unexpended June 30, 1937 -------------------------                                                            731. 72
   2In addition, $25,000 was expended from contributed funds.
1604      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Outstanding liabilities June 30, 1937---------------------------$731. 72
Amount allotted from War Department Civil Appropriation Act ap-
  proved July 19, 1937-------------------------------------                                    1, 000. 00
Balance available for fiscal year 1938---------                                                   000.00
                                                                                               1------------------,
Amount (estimated) required to be appropriated for completion of
existing project 1---------------------------------------       197, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1939:
    For new work 1__                        ----------                  -------              197, 000. 00
                        1    -- - -- - -- - -- - - -- - -- - -- - -- - - -- - -- - -- - --
    For maintenance                                                                      _     5, 000. 00

       Total ----           -------------------------------------                            202, 000. 00
SExclusive of available funds.

              35. SALMON RIVER, ALASKA, FLOOD CONTROL

   Location.-Salmon River rises in Canada and flows in a southerly
direction into the southeastern part of Alaska and empties into Port-
land Canal at the town of Hyder. Its total length is about 25 miles.
 (See U. S. Coast and Geodetic Survey Chart No. 8051.)
   Existing project.-This provides for the control of floods at the
town of Hyder by the reconstruction of 681 feet of existing dike,
construction of 3,653 feet of new dike, and clearing of the flood plain
west of the present channel.
   The estimated cost, made in 1931, was $53,000 (including $7,000
contributed by local interests) for new work and $1,000 annually for
maintenance. The project was adopted by the act approved June
18, 1934, Public No. 388, Seventy-third Congress (H. Doc. No. 228,
72d Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-In accordance with the provisions of the act
of June 18, 1934, local interests are required to contribute $7,000
toward the first cost of the work and $200 annually for maintenance.
An appropriation of $7,000 was made by the Territorial legislature
in 1933 for this purpose. Prior to the adoption of the existing
project, approximately $8,000 was expended by the United States
Bureau of Public Roads for a rock dike, and $26,350 by Territorial
and local interests for dikes, revetment, and dredging with view to
flood protection.
   Terminal facilities.-None.
   Operationsand results during fiscal year.-The dikes were repaired
by placing 200 tons riprap by hired labor in September 1936 at a
cost of $927.95, including $200 contributed funds, all for maintenance.
The expenditures were $727.95 from United States funds and $200
from contributed funds.
   Condition at end of fiscal year.-The project was completed in
1935 at a saving of $11,768 under the estimated cost. The dikes
have withstood several severe floods and some settlement has occurred.
   The costs and expenditures on the existing project for work done
by the Engineer Department have been $34,231.20 for new work
and $727.95 for maintenance, a total of $34,959.15.        In addition,
$7,000 was expended from contributed funds for new work and $200
for maintenance.
   Proposedoperations.-The funds unexpended June 30, 1937, $72.05,
together with an allotment of $800 made during September 1937
                 RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                       1605
and $200 to be contributed by local interests, will be applied to re-
pairs to dikes, by hired labor, as required during the fiscal year 1938.
  The additional sum of $1,000, including $200 to be contributed
by local interests, can be profitably expended during the fiscal year
1939 for dike repairs, as required.
                                         Cost and financial summary

                                            UNITED       STATES    FUNDS

Cost of new work to June 30, 1937-----------------------------   $34, 231.20
Cost of maintenance to June 30, 1937 ---------------------------      727. 95
           Total cost of permanent work to June 30, 1937------------                                           34, 959. 15

Net total expenditures---  ----------------------------------                                                  34, 959.15
Unexpended balance June 30, 1937- ---------------------                                                             72. 05

           Total amount appropriated to June 30, 1937----------------                                          35, 031. 20

           Fiscal year ending June 30                  1933        1934             1935             1936          1937


Cost of new work             ---------------------------------------             $34, 116. 22        $114.98 ..
Cost of maintenance               _______         _-------------- ------------------------ ----------
                                                 ------------                                                       $727.95
Total expended ___________         _____.   __-___                                27,445.10        6, 786.10
                                                                                                 ---                 727. 95
Allotted--------------------------------                  ----------------        46,000.00 -10,968.80


Balance unexpended July 1, 1936                                                                                   800. 00
                                                                                                                 $----------------
Gross amount expended____________--________--_                                                  $927. 95
Less reimbursements collected------------------------                                            200.00
                                                                                                                  727. 95

Balance unexpended June 30, 1937.______________--------------                                                      72.05
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------                                                      800. 00

Balance available for fiscal year 1938____--___-------------------                                                872.05
Amount that can be profitably- -expended
                                 -- ---
                                         in fiscal year ending June
30, 1939, for maintenance 2___ ________                                                                          800.00
   1 Includes $34,231.20 expended from Public Works funds.
   2 Exclusive of available funds.

                                             CONTRIBUTED FUNDS

Cost of new work to June 30, 1937 ----------                                                       __-__--$7, 000
Cost of maintenance to June 30, 1937--------- --                                  --             ___-----200
      Total cost of permanent work to June 30, 1937 ______-----                                                    7, 200
Net total expenditures  ----------------------------------------                                                   7. 200
      Total amount contributed to June 30, 1937___-- ___________                                                   7, 200

            Fiscal year ending June 30                 1933        1934                1935          1936          1937


Cost of new work....-------------------------------------------    $7, 000
Cost of maintenance ....... -   -         -          -     -..........................---------
                                                                                              $200
Total expended-......-..--       .----
                                 ..--       -.                 -          ---.            000.
                                                                                         ,--------                        200   I




Contributed...--------------......................-----------------7,000                                                  200


Contributed by Territory of Alaska Aug. 6, 1936 ------------------                                                   $200
Gross amount expended-------------------____                                                                          200
Amount that can be profitably expended in fiscal year ending June 30,
1939, for maintenance------------------- ---------                                                                   200
1606             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

CONSOLIDATED             COST AND FINANCIAL                  SUMMARY          FOR SALMON RIVER,              ALASKA,           FLOOD
                                                              CONTROL

Cost of new work to June 30, 1937--_-----------------------     1$41,231. 20
Cost of maintenance to June 30, 1937---------------__----------      927. 95

           Total cost of permanent work to June 30, 1937--                                   __--------                42, 159. 15
Net total expenditures______-------                                          -------                                   42, 159. 15
Unexpended balance June 30, 1937                                                                                             2. 05
                                                                                                                            7-----------------------
           Total amount appropriated and contributed to June 30, 1937_                                                 42, 231. 20

           Fiscal year ending June 30                         1933           1934            1935          1936             1937


Cost of new work _____.....................     _ ......           .                    $41, 116. 22       $114. 98         --
Cost of maintenance--------------- ------------         ----------                      ----------      -----------          $927.95

Total expended-----------.-----....            .        _-- ---------                 -34,    445. 10     6, 786. 10           927.95

Allotted and contributed_..--._---_--.-                              --------------      53, 000. 00 -10, 968. 80              200. 00


Balance unexpended July 1, 1936_________---------------$800.         00
Contributed by Territory of Alaska Aug. 6, 1936 ____ - __-_____ 200. 00
      Amount to be accounted for----------------------------                                                            1, 000. 00
Gross amount expended--------------------------$1,       127.95
Less reimbursements collected_-------------------        200. 00
                                                                                                                           927. 95

     Balance unexpended June 30, 1937_-......    _______-_____                                                              72.05
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-____________________________-          -___                                                        800. 00
      Balance available for fiscal year 1938                                                                               872. 05
Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 2________________________________ __                                                          1,000. 00
   1 Includes $34,231.20 expended from Public Works funds.
   2 Exclusive of available funds.

Status of reports called for by river and harbor acts and committee resolutions

           Locality                     Authorization act          Transmitted
                                                                   to Congressno.       Document no.                   Recommen-
                                                                                                                        dation
                                                                             to        Cogressdation

Bethel Harbor, Alaska.                River and Harbor Act, Jan. 23, 1937                                         Unfavorable.
                                        Aug. 30, 1935.
Blaine Harbor, Wash....               ...
                                       _do-............... Nov. 9, 1936                                                  Do.
Chehalis River and trib-              Flood Control Act, -- - - - - - -
utaries, Wash. (pre-                   June 13, 1934.
liminary examination
  for flood control).
Columbia River and mi-                Senate committee res-
  nor tributaries (Clark                olution, Apr. 6, 1937.
  Fork and Lake Pend
  Oreille).
Craig Harbor, Alaska-...    River and Harbor Act,
                              Aug. 26, 1937.
Douglas Harbor, Alaska_ River and Harbor Act, May 14, 1937 House, 249, 75th Cong., Favorable.
                             Aug. 30, 1935.                            1stsess.
Duwamish River, Wash_ - do......... -......
                                        --            Nov. 19, 1936                         Unfavorable.
Elfin Cove, Alaska_...... River and Harbor Act,
                             Aug. 26, 1937.
Everett Harbor, Wash._ Senate Committee res- Dec. 10, 1936                                     Do.
                              olution, Jan. 25, 1934.
    D o-.-----.- ..-- .- .. Rivers and Harbors .....     do-.............................._    Do.
                              Committee resolu-
                             tion, Aug. 7, 1933.
    Do.................. Rivers and Harbors
                              Committee resolu-
                             tion, Feb. 23, 1937.
              RIVERS AND HARBORS-SEATTLE, WASH., DISTRICT                                                                                                      1607
        Status of reports called for by river and harbor acts and committee
                                            resolutions-Continued


         Locality               Authorization act           Transmitted
                                                            to Congress                                Document no.
                                                                                                       Document no.                                  Recommen-
                                                                                                                                                      eo
                                                              to Congress                                                                              dation

Grantley Harbor at            River and Harbor Act,
Teller, Alaska.               Aug. 26, 1937.
Haines Harbor, Alaska_        River and Harbor Act,         Dec. 12,1936                     ..........-........                                    Unfavorable.
                               Aug. 30, 1935.
ERomer Harbor, Kache-        _._ do---------------          Feb. 25,1937                                                                                  Do.
  mak Bay, Alaska.
Juneau Harbor, Alaska_               do....-------------
                             ---.....--                     May 14,1937                       House, 249, 75th Cong.,                               Favorable.
                                                                                               1st sess.
Kake Harbor, Alaska __ ----- do. .---- -. ---- Nov. 19, 1936                                                                                        Unfavorable.
Lowell Creek, Alaska Flood Control Act, Feb. 19,1937                                          House, 154, 75th Cong.,                               Favorable.
  (survey) .               May 6, 1936.                                                         1st sess.
Matanuska River in vi- ----- do---------------- Apr. 29,1937                                 ........................
cinity of Matanuska,
Alaska (preliminary
examination for flood
control).
Metlakatla Harbor, Al- River and Harbor Act,                Tln              1     1non


                                                                                   not
                                                                                                                                                    TTr....eihls




aska.
                                                           1Jec.             ii,           I----------------------                              '   UIValaulole


                           Aug. 30, 1935.
Myers Chuck Harbor, River and Harbor Act,
Alaska.                   Aug. 26, 1937.
Neah Bay, Wash_....... Rivers and Harbors
                               Committee resolu-
                               tion, Jan. 27, 1937.
Port Angeles Harbor,          River and Harbor Act,
  Wash.                        Aug. 26, 1937.
Prince of Wales Island,       River and Harbor Act,         Jan.                 5, 1937      ...        ...            ..        .     .                 Do.
  Alaska, ship canal           Aug. 30, 1935.
  across.
Puget Sound to Lake       Senate committee reso-
  Crockett, Wash.           lution, Apr. 14,1937.
Seldovia Harbor, Alaska.  River and Harbor Act,
                            Aug. 26, 1937.
Shelton Harbor, Wash__ River and Harbor Act,                Jan. 18,1937                                                                                  Do.
                            Aug. 30, 1935.
Sinuk River, Alaska, River and Harbor Act,
  mouth of.                 Aug. 26, 1937.
Sitka Harbor, Alaska_ _ River and Harbor Act,               June 11,1937                      House, 268, 75th Cong.,                               Favorable.
                            Aug. 30, 1935.                                                      1st sess.
Skagit River and tribu- Flood Control Act,                 ...............                   ........................
  taries, Wash. (prelimi-   June 13, 1934.
  nary examination for
  flood control).
Skagway Harbor, Alas-         River and Harbor Act,
  ka.                           Aug. 30, 1935.
Spokane River and             Flood Control Act,
  tributaries, Idaho            Mar. 18, 1936.
  (preliminary examina-
  tion for flood control).
Tacoma Harbor, Wash.    Rivers and Harbors
  (Wapato Waterway).      Committee resolu-
                          tion, Mar. 2, 1937.
Tanana River, Alaska___ Rivers and Harbors
                          Committee resolu-
                          tion, Feb. 4, 1937.
Tanana River and Flood Control Act,
  Chena Slough, Alaska    July 1, 1935.
 (preliminary examina-
tion for flood control).
Tanana River and              River and Harbor              Jan. 23, 1937                    -..-......-............                                Unfavorable.
Chena Slough, Alaska.         Act, Aug. 30, 1935.
Tenakee Inlet to Port         River and Harbor               _.. . . . . . . . . . . . . - -,-... . . . . .         . . . . . .   . . . . . .
Frederick on Chi-             Act, Aug. 26, 1937.
chagof Island, Alaska,
waterway.
Unalaska Harbor,        River and     Harbor               ---------------                          ---------------------
Alaska.                 Act, Aug. 30, 1935.
Unga Harbor, Alaska_- _ River and     Harbor               ---------------                     ---------------------
                         Act, Aug. 26, 1937.
Valdez Harbor, Alaska_- River and Harbor                   --------------- ----------------------
                         Act, Aug. 30, 1935.
Wrangell Harbor, River and Harbor                          --------------- ------------------------
Alaska.                 Act, Aug. 26, 1937.
Yakima River and trib- Flood Control Act,                  --------------- ----------^--------------
utaries, Wash. (pre-    May 6, 1936.
  liminary examination
  for flood control).
                                                                                                                                                I
1608       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

      IMPROVEMENT OF RIVERS AND HARBORS IN THE
             HONOLULU, HAWAII, DISTRICT

  This district includes all islands in the Hawaiian group, including
Midway Island and Wake Island.
  District engineer: Maj. R. G. Barrows, Corps of Engineers, to
July 5, 1936; Lt. Col. R. C. Crawford, Corps of Engineers, since that
date.
  Division Engineer: Col. T. H. Jackson, Corps of Engineers, to
September 1, 1936; Col. J. J. Kingman, Corps of Engineers, since
that date.
                               IMPROVEMENTS

                                 Page                                              Page
1.   Honolulu Harbor, Hawaii-.--  1608 7.   Wake Island Harbor ---- .              1618
2.   Kahului Harbor, Hawaii---    1611 8.   Welles      Harbor,           Midway
3.   Hilo Harbor, Hawaii .--------1612        Island__       _           _-        1619
4.   Nawiliwili Harbor, Hawaii__  1614 9.   Examinations,         surveys,   and
5.   Port Allen Harbor, Hawaii__  1616        contingencies (general) _            1620
6.   Kaunakakai Harbor, HawaiiL 1617 10.    Plant allotment_-----------_           1621

                     1. HONOLULU HARBOR, HAWAII

   Location.-This harbor is on the south coast of the island of Oahu,
about 2,100 miles from San Francisco. (See U. S. Coast and Geo-
detic Survey chart no. 4109.)
   Existing project.-This provides for an entrance channel 40 feet
deep and 500 feet wide; easing the curve where the entrance channel
joins the inner harbor; deepening the harbor basin to 35 feet, for a
general width of 1,520 feet; dredging to 35 feet along the reserved
channel, a channel 900 feet wide and 1,000 feet long, and thence a
channel along the northerly side of the reserved channel 400 feet
wide and about 3,000 feet long connecting Honolulu Harbor with
Kapalama Basin.
   The plane of reference is mean lower low water. The range of
tide between mean lower low water and mean higher high water is
1.9 feet, and the extreme tidal range under ordinary conditions is
2.3 feet.
   The estimate of cost for new work, revised in 1935, was $3,959,600.
The latest (1935) approved estimate of cost of annual maintenance is
$15,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for deepening the
inner harbor with a general width of 1,200 feet, and the easing of
the curve between the entrance channel and the inner harbor (Annual
Report of 1905, p. 2565) ; act of August 8, 1917 (H. Doc. No. 392, 64th
Cong., 1st sess.), provided for the channel 1,000 feet long; act of July 3,
1930 (H. Doc. No. 753, 69th Cong., 2d sess.), provided for the channel
connecting Honolulu Harbor and Kapalama Basin, and the Public
Works Administration, September 6, 1933, and the act of August 30,
1935 (H. Doc. No. 54, 73d Cong., 1st sess.), provided for enlarging
the entrance channel to 40 feet deep, and 500 feet wide, for the widen-
ing of the harbor basin by 320 feet, and the maintenance of the im-
proved 400-foot wide portion of the reserved channel. The latest
published map is in the last-mentioned document.
             RIVERS AND HARBORS-HONOLULU, HAWAII, DISTRICT                                                            1609
   Terminal facilities.-The United States Government controls ter-
minal facilities for the use of the Army Transport Service, the Navy,
and the Lighthouse Service. The greater part of the terminal facil-
ities belong to the Territory and they, together with those privately
owned, are administered by the Territorial Board of Harbor Com-
missioners and are open to shipping on equal terms.
   There are 30 piers and wharves, of which 6 are owned by the United
States Government, 14 by the Territory, and the others privately.
   The facilities are considered adequate. (For further details see
Port Series No. 17, Corps of Engineers.)
   Operations and results during fiscal year.-Miscellaneous surveys
and routine work cost $3,030.22 and harbor patrol cost $1,444.08. Total
maintenance cost $4,474.30. The total expenditures were $1.20 from
Public Works funds and $3,984.26 from regular funds, a total of
$3,985.46.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935, at a saving of $7,237 under the estimated cost. The
controlling depth in April 1937 was 40 feet in the entrance channel
and 35 feet in the harbor basin and in the improved portion of the
reserved channel.
   The total cost to June 30, 1937, was $4,275,479.52, of which $3,952,-
363.43 (including $784,800 from Public Works funds) was for new
work and $323,116.09 for maintenance. The total expenditures were
$4,275,479.52, including $784,800 from Public Works funds.
   Proposed operations.-The balance unexpended July 1, 1937, in-
cluding accounts receivable, together with an allotment of $18,000
made during July 1937, will be applied to dredging channel and
harbor basin by Government dredge, including surveys, during
November 1937.
   The additional sum of $15,000 can be profitably expended for main-
tenance during the fiscal year 1939, to be applied to repair of Sand
Island sea wall and revetment and to surveys of the harbor.
                                              Cost and financial summary

                                     MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1937-_---------------------_                                                    $3, 167, 563. 43
Cost of maintenance to June 30, 1937-----------------------                                                      323, 116. 09
           Total cost of permanent work to June 30, 1937 ------------ 3, 490, 679. 52
Net total expenditures     ---------------------------------                                                  3, 490, 679. 52
Unexpended balance June 30, 1937-----------------1------------                                                     1, 049. 96

           Total amount appropriated to June 30, 1937---------------                                          3, 491, 729. 48

    Fiscal year ending June 30                      1933               1934            1935           1936           1937

Cost of new work.....--------....--......
Gost of maintenance-------         --.........-
                                        .
                                                $241, 055. 86
                                                  24, 390. 85
                                                                   ---
                                                                    $35, 972. 50     $4, 847. 25    $28, 195. 53     $4, 474. 30
       Total cost--.       ------------           265, 446. 71        35, 972. 50      4, 847. 25    28, 195. 53      4, 474. 30
Total expended--....------          ------        276, 977. 85        37, 251. 11   -33, 342. 63     24, 809. 24      3, 984. 26
Allotted      -------------------.........................
                                                    295, 101. 08       7, 000. 00   -21,776. 62      40, 277. 45   -31, 000. 00
1610                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 -------------------------                                                                  $36, 034. 22
Deductions on account of revocation of allotment-... - __                                                  __-
                                                                                                         -31,                   000. 00
      Net amount to be accounted for                                                                                         5, 034. 22
Gross amount expended___---------- ---                                             ___$4,               924.91
Less reimbursements collected --.-----                                      ___________-                940. 65
                                                                                                                             3, 984. 26

     Balance unexpended June 30, 1937 ....                                                                                   1, 049. 96
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937__-----                                                                                              18, 000. 00

     Balance available for fiscal year 1938-----------__                                                                    19, 049. 96
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for maintenance 1-__-                                                                                       15, 000. 00
     1 Exclusive of available funds.

                                                          PUBLIC WORKS            FUNDS

ICost of new work to June 30, 1937_ __-------------                                                     --__              $784, 800. 00
Cost of maintenance to June 30, 1937_
      Total cost of permanent work to June 30, 1937_.---------                                                             784, 800. 00
Net total expenditures____-- __----_--____-_____                                                                           784, 800. 00
Total amount appropriated to June 30, 1937--------------------                                                             784, 800. 00

     Fiscal year ending June 30                           1933             1934            1935             1936               1937


Cost of new work-.__--.....                               .___--------------
                                                                     $320, 016. 55      $464, 783.45           -$1. 20                $1.20
Cost of maintenance----------                      ----                ------------------------- -------------             ------------
Total expended ._..............                        ________          297, 227. 75    486, 678. 80           892. 25                1. 20

Allotted          --------------------------------                       802, 800. 00   -18, 000. 00            -1.20                  1.20


Amount allotted from National Industrial Recovery Act, approved June
  16, 1933_----------     ---------------------------------------    $1. 20
Gross amount expended--     ---------------------------------------   1. 20
              CONSOLIDATED COST AND FINANCIAL SUMMARY FOR HONOLULU HARBOR

Cost of new work to June 30, 1937 ----------------------                                                          $3, 952, 363. 43
Cost of maintenance to June 30, 1937------------------                                                           -- 323, 116. 09
             Total cost of permanent work to June 30, 1937------                                                _    4, 275, 479. 52
Net total expenditures _______________
                         ----- -           -                                          ____-                          4, 275, 479. 52
Unexpended balance June 30, 1937_ ----------                                        __________-___                        1, 049. 96
             Total amount appropriated to June 30, 1937--------------4,                                                   276, 529. 48

      Fiscal year ending June 30                          1933             1934            1935             1936               1937


Cost of new work ..-------------                       $241, 055. 86    $320, 016. 55   $464, 783. 45        -$1. 20                $1. 20
Cost of maintenance-------------...........              24, 390. 85      35, 972. 50      4, 847. 25     28, 195. 53           4, 474. 30
         Total cost----..-. .....-          -...        265, 446. 71     355, 989. 05    469, 630. 70     28, 194. 33           4, 475. 50
Total expended..............----------------            276, 977. 85     334, 478. 86    453, 336. 17     25, 701.49            3, 985. 46
Allotted......................---------------------.   295, 101.08      809, 800. 00    -39, 776. 62      40, 276. 25        -30, 998. 80


Balance unexpended July 1, 1936 _____________________________                                                              $36, 034. 22
Amount allotted from National Industrial Recovery Act, approved
  June 16, 1933--------------------------------------------                                                                       1.20
             Amount to be accounted for_                                    _----------------------------                   36, 035. 42
        RIVERS AND HARBORS-HONOLULU, HAWAII, DISTRICT                      1611
Deductions on account of revocation of allotment--------------        $31, 000. 00

      Net amount to be accounted for----------------                    5, 035. 42
                                    -------
Gross amount expended_________________---               $4, 926. 11
Less reimbursements collected-_ _--    __---------          940. 65
                                                                        3, 985. 46

     Balance unexpended June 30, 1937_________-----------               1,049.96
Amount allotted from War Department Civil Appropriation Act,
approved July 19, 1937_--------- ____           ____-------------     18, 000. 00

     Balance available for fiscal year 1938                            19, 049. 96
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance 1_______________________              15, 000. 00
1 Exclusiveof available funds.

                       2. KAHULUI HARBOR, HAWAII

   Location.-This harbor is on the north coast of the island of Maui,
about 94 miles southeast of Honolulu. (See U. S. Coast and Geodetic
Survey Chart No. 4105.)
   Existing project.-This provides for the extension to a total
length of 2,850 feet of the privately constructed rubble-mound break-
water on the east side of the harbor, for a rubble-mound breakwater
on the west side with an approximate length of 2,396 feet, and for
the dredging of a basin in the lee of the east breakwater to a depth
of 35 feet, mean lower low water, and a maximum width of 1,450
feet. The range of tide between mean lower low water and mean
higher high water is 2.4 feet and the extreme tidal range under nor-
mal conditions is 3.4 feet.
   The estimate of cost for new work, revised in 1927, was $1,988,000.
The latest (1931) approved estimate for annual cost of maintenance
is $30,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for extending the
east breakwater and dredging the basin (H. Doc. No. 593, 61st Cong.,
2d sess.) and the act of July 27, 1916, provided for the west break-
water (H. Doc. No. 1330, 62d Cong., 3d sess.). The act of January
21, 1927, provided for the extension of both breakwaters and the en-
largement of the dredged basin (H. Doc. No. 235, 69th Cong., 1st
sess.). The latest published map is in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are two wharves at the end of the har-
bor, both owned by the Territory. Pipe lines for fuel oil, molasses,
kerosene, gasoline, distillate, and water are available. The facilities
are adequate. (For further details see Port Series No. 17, Corps of
Engineers.)
   Operations and results during fiscal year.-Miscellaneous surveys
and routine work cost $6,745.60 for maintenance. The total expen-
ditures were $6,745.60.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth in May 1937, was 35 feet.
   The total cost of the existing project to June 30, 1937, was
$2,098,818.53, of which $1,778,560.46 was for new work and $320,-
258.07 for maintenance. The total expenditures were $2,104,873.25.
  Proposed operations.-The balance unexpended July 1, 1937, in-
cluding accounts receivable, together with an allotment of $14,000
1612          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

made during July 1937, will be applied to dredging entrance channel
and harbor basin by Government dredge, including surveys, during
December 1937.
  The additional sum of $20,000 can be profitably expended for
maintenance during the fiscal year 1939, to be applied to break-
water repair and to survey of the harbor.
                                     Cost and financial summary

Cost of new work to June 30, 1937-----      __--_____---- $1, 778, 560. 46
Cost of maintenance to June 30, 1937- ----------------   ---  320, 258. 07
      Total cost of permanent work to June 30, 1937--------         2, 098, 818. 53
Undistributed costs June 30, 1937------------------         -------      6, 054. 72

           Net total cost to June 30, 1937 ----------------                                     2, 104, 873. 25
Net total expenditures---------------------------------                                        2, 104, 873.25
Unexpended balance June 30, 1937 ------------------                                                 2, 504. 29
           Total amount appropriated to June 30, 1937___---                          -__-2,          107, 377. 54

    Fiscal year ending June 30             1933           1934          1935            1936             1937


Cost of new work-.................------------------
Cost of maintenance..-------------.... $4, 612. 77      $27, 255. 53   $4, 419. 67     $3, 250. 11       $6, 745. 60
Total expended---.--------------           4, 894. 73    27, 120. 25    3, 948. 00      3, 250. 11        6, 745. 60
Allotted                                 8, 817. 58
                   .------------------------             18, 582. 30    9, 000. 00     34, 947. 88     -42, 447. 88


Balance unexpended July 1, 1936_------- -----                                                        $51, 697. 77
Deductions on account of revocation of allotment _-____-....                                          42, 447. 88
      Net amount to be accounted for ----------------------                                          - 9, 249.89
Gross amount expended__---     -              -------
                                         -_____-                                       -----           6, 745. 60
     Balance unexpended June 30, 1937-------------                                                     2, 504. 29
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937---------------------------------_                                             14, 000. 00
      Balance available for fiscal year 1938_ _-__----__            16, 504. 29
Amount that can be profitably expended in fiscal year ending
                                  _
  June 30, 1939, for maintenance                 _______------
                                                          _'---_-__ 20, 000. 00
 'Exclusive of available funds.
                                    3. HILO HARBOR, HAWAII

   Location.-This harbor is on the northeast coast of the island of
Hawaii, about 200 miles southeast of Honolulu. (See U. S. Coast
and Geodetic Survey Chart No. 4103.)
   Existing project.-This provides for a rubble mound breakwater
10,170 feet long, for the removal of shoals at the entrance to Kuhio
Bay to a depth of 35 feet, and for dredging an area in Kuhio Bay
1,400 feet wide, about 2,300 feet long, and 35 feet deep.
   The plane of reference is mean lower low water. The range of
tides between mean lower low water and mean higher high water is
2.3 feet, and the extreme range under ordinary conditions is 3.2 feet.
   The estimate of cost of new work, revised in 1925, was $3,800,000.
The latest (1925) approved estimate of annual cost of maintenance
is $5,000.
              RIVERS AND HARBORS-HONOLULU, HAWAII, DISTRICT                                                                             1613
  The existing project was authorized by the following river and
harbor acts: rThe act of March 2, 1907, provided for a breakwater at
a cost of $1,700,000 (H. Doc. No. 407, 59th Cong., 2d sess.); the act
of July 25, 1912, provided for dredging the entrance to Kuhio Bay
without increasing the original limit of cost (H. Doc. No. 417, 62d
Cong., 2d sess.); and the act of March 3, 1925, provided for the
extension of the breakwater and dredging in the bay (H. Doc. No.
235, 68th Cong., 1st sess.). The latest published map is in the last-
mentioned document.
   I'erminal facilities.-The Territory of Hawaii has constructed
three piers at the head of Kuhio Bay. The facilities are considered
adequate. (For further details see Port Series No. 17, Corps of
Engineers.)
   Operations and results during fiscal year.--Miscellaneous surveys
and routine work cost $1,734.10 for maintenance. The total expendi-
tures were $1,734.10.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1930. The controlling depth in October 1935 was 35 feet.
The width of the entrance channel for 35-foot depth was 1,100 feet.
   The total cost of the existing project to June 30, 1937, was
$3,462,253.22, of which $3,408,825.58 was for new work and $53,-
427.64 for maintenance. The total expenditures were $3,462,253.22.
   Proposed operations.-The balance unexpended July 1, 1937, in-
cluding accounts receivable, together with an allotment of $18,000
made during July 1937, will be applied as follows:
Accounts payable, June 30, 1937-------------------------------     $19. 52
Maintenance: Dredging channel and harbor basin by Government
dredge, including surveys, December 1937----------__________  18, 329.50
                         -
             Total________---                  ____-----------                                                                      18, 349.02
  The additional sum of $5,000 can be profitably expended for main-
tenance during the fiscal year 1939, to be applied to breakwater re-
pair and to survey of the harbor.
                                                  Cost and financial summary
Cost of new work to June 30, 1937___---      ----  ______________ $3, 408,825.58
Cost of maintenance to June 30, 1937__------__________________         53, 427. 64
      Total cost of permanent work to June 30, 1937                                                                            3, 462, 253.22
Undistributed costs June 30, 1937 __ __1_______________1__                                                                              19. 52
      Net total cost to June 30, 1937__-----------------------3, 462, 272. 74
Minus accounts payable June 30, 1937--------------------------         19. 52
     Net total expenditures___-----------------------                                                                          3, 462, 253. 22
Unexpended balance June 30, 1937_____--___________________                                                                _            349. 02
            Total amount appropriated to June 30, 1937 --                                                   -------            3, 462, 602. 24

    Fiscal year ending June 30                            1933                  1934                1935               1936            1937


Cost of new work.....------...................................................................
Cost of maintenance...---------.......                  $4, 582. 97           $8, 059. 11            $506.05          $4, 159. 47      $1, 734. 10
Total expended..                    __         ....       4, 637. 95           7, 654. 33        -16, 591. 54         20, 114. 04       1,734. 10
Allotted -- _-_---.----- - - ..                         11, 846. 62            4, 058. 56           -384. 61          19, 581. 67    -18, 500. 00
1614      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936-----------------           ---      $20, 583. 12
Deductions on account of revocation of allotment --------------      18, 500. 00

      Net amount to be accounted for------------------------          2, 083.12
Gross amount expended _-------------------------     $1,
                                                      744.10
Less reimbursements collected----------------------    10. 00
                                                                      1, 734. 10

      Balance unexpended June 30, 1937----------------------            349. 02
Outstanding liabilities June 30, 1937----------------------------        19. 52

     Balance available June 30, 1937---------------------               329. 50
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------------         18, 000. 00
    Balance available for fiscal year 1938 ------------------        18, 329. 50
Amount that can be profitably expended in fiscal year ending
  June 30, 1939, for maintenance '----....,-----                      5, 000. 00
  1Exclusive of available funds.

                       4. NAWILIWILI HARBOR, HAWAII

   Location.-This harbor is on the southeast coast of the island of
Kauai, about 100 miles northwest of Honolulu. (See U. S. Coast and
Geodetic Survey Chart No. 4111.)
   Existing project.-This provides for a rubble-mound breakwater
about 2,150 feet in length along the reef which separates this bay into
an inner and an outer harbor; for an entrance channel 35 feet deep
with a minimum width of 600 feet and a length of about 2,400 feet;
for a harbor basin 35 feet deep 1,100 feet wide, and with an average
length of about 2,000 feet protected by a filled area in addition to
the protection afforded by the breakwater. The plane of reference
is mean lower low water. The tidal range between mean lower low
water and mean higher high water is about 1.8 feet, the extreme tidal
range being about 4 feet.
   The estimate of cost for new work, revised in 1928, was $1,900,000,
of which $200,000 was contributed by local interests. The latest
 (1931) approved estimate for annual cost of maintenance is $35,000.
   The existing project was authorized by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 609, 62d Cong., 2d sess.). The latest
published map is found in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The Territory has constructed a concrete
wharf, with concrete-steel transit shed and an open wharf in prolon-
gation thereof, on the southern side of a 47.5-acre tract reclaimed for
terminal purposes.
   The facilities are considered adequate.
   Operationsand results during fiscal year.-Minor repairs were made
to the breakwater by Government plant and hired labor by placing
345 tons of stone at a cost of $10,442.05 for maintenance. In addition
miscellaneous surveys and routine work cost $6,760.47, a total of
$17,202.52 for maintenance. The total expenditures were $14,224.54.
   Conditionat end of fiscal year.-The existing project was completed
in 1930. The controlling depth in June 1937 was 35 feet.
   The total cost of the existing project to June 30, 1937, was $1,383,-
618.11, of which $1,197,178.23 was for new work and $186,439.88 for
               RIVERS AND HARBORS-HONOLULU, HAWAII, DISTRICT                                                                 1615
maintenance. The total expenditures were $1,391,318.58. In addi-
tion $200,000 was expended from contributed funds.
   Proposed operations.-The balance unexpended July 1, 1937, in-
cluding accounts receivable, together with an allotment of $13,000
made during July 1937, will be applied as follows:
Accounts payable June 30, 1937------------------------------------    $673.'38
Maintenance: Dredging entrance channel and harbor basin by Govern-
  ment dredge, including survey, January 1938 --------------------- 16, 013. 69
            Total ----------------------------------------------------                                                  16, 687. 07
   The additional sum of $20,000 can be profitably expended for main-
tenance during the fiscal year 1939, to be applied to breakwater repair
and to survey of the harbor.
                                                      Cost and financial summary

Cost of new work to June 30, 1937--------------------------                                                   $1, 197, 178. 23
Cost of maintenance to June 30, 1937--------------------------                                                    186, 439. 88
      Total cost of permanent work to June 30, 1937-----------                                                   1, 383, 618. 11
Undistributed costs to June 30, 1937------------------------                                                          8, 373. 85
      Net total cost to June 30, 1937-------------------------                                                   1, 391, 991. 96
Minus accounts payable June 30, 1937--------------------------                                                          673. 38
     Net total expenditures__----------                                                                       11, 391, 318. 58
Unexpended balance June 30, 1937----------                                                                          3, 687.07

             Total amount appropriated to June 30, 1937------------                                             1, 395, 005. 65

           Fiscal year ending June 30                               1933          1934         1935         1936             1937


Cost of new work----------------
Cost of maintenance.... ..._---------------_-
                                             ----------        -------------       ------------
                                                   $13, 532. 97 $49, 853. 56 $15, 883.09     $6, 951. 94
                                                                                                                         -----------
                                                                                                                           $17, 202. 52
Total expended.......................-----------------------...   14, 064. 49   46, 237.48    1, 243.85   12, 046.02        14, 224. 54
Allotted-------------------------------                           63, 566.05       200.00    20, 201.86    9, 699. 62      -4, 500.00


Balance unexpended by July 1, 1936------------------------                                                              $22, 411. 61
Deductions on account of revocation of allotment-------------                                                             4, 500. 00

      Net amount to ,be accounted for-----------------------                                                             17, 911. 61
Gross amount expended_------------------------------------                                                               14, 224. 54
      Balance unexpended June 30, 1937---         ------------------                                                      3, 687. 07
Outstanding liabilities June 30, 1937-------------------------                                                               673. 38
     Balance available June 30, 1937-----------------------                                                               3, 013.69
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937------------------------------                                                                    13, 000. 00
              Balance available for fiscal year 1938_                                                                    16, 013. 69

Amount that can be profitably expended
                                    -  ---                - - - - - ending
                                             in fiscal- - year
June 30, 1939, for maintenance 2                                                                                        20, 000. 00
1Exclusive of $200,000 expended from contributed funds.
s Exclusive of available funds.




              20196-37-pt. 1--102
1616      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                   5. PORT ALLEN        HARBOR,     HAWAII

   Location.-This harbor is located on the southern coast of the
island of Kauai, about 115 miles northwest of Honolulu. (See U. S.
Coast and Geodetic Survey Chart No. 4108.)
   Existing project.-This provides for a rubble-mound breakwater
about 1,200 feet long on the east side of the bay; for the dredging
of a harbor basin about 1,000 feet wide, 1,500 feet long, and 35 feet
deep; and an entrance channel 500 feet wide and 35 feet deep.
   The plane of reference is mean lower low water. The range of
tide between mean lower low water and mean higher high water
is 1.7 feet, and the extreme tidal range under ordinary conditions
is 2.7 feet.
   The estimate of cost for new work, made in 1933, was $880,000, of
which $200,000 was contributed by local interests. The estimate of
cost for annual maintenance, made in 1933, is $15,000.
   The existing project was authorized by the Public Works Admin-
istration September 6, 1933, and adopted by the River and Harbor
Act of August 30, 1935 (H. Doc. No. 30, 73d Cong., 1st sess.). The
latest published map is in that document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-A short breakwater and terminal facilities at
the southeastern end of the bay provide for transfer of cargo by
lighter. Oil and molasses are pumped through floating pipe lines,
between shore and ship. The present facilities are inadequate, but
steps have been initiated by the Territory for the provision of ade-
quate facilities.
   Operations and re.ults during fiqscal year.,Miscellaneous surveys
and routine work cost $4,545.65 for maintenance. The total expendi-
tures were $4,197.77.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935. The controlling depth ascertained in June 1937 was
35 feet.
   The total cost of the existing project to June 30, 1937, was $889,-
259.16, of which $880,000 was for new work ($680,000 from Public
Works funds and $200,000 contributed funds) and $9,259.16 for
maintenance. The expenditures were $680,000 from Public Works
funds, $200,000 from contributed funds, and $8,725.98 from regular
funds, a total of $888,725.98.
   Proposed operations.-The balance unexpended July 1, 1937, in-
cluding accounts receivable, together with an allotment of $24,000
made during July 1937, will be applied as follows:
Accounts payable June 30, 1937------------------------------------  $533. 18
Maintenance: Dredging entrance channel and harbor basin, by Gov-
  ernment dredge, including survey, January and February 1938... 24, 089. 81

       Total ----------------------------------------------------   24,622.99
  The additional sum of $15,000 can be profitably expended for main-
tenance during the fiscal year 1939, to be applied to breakwater repair
and to survey of the harbor.
               RIVERS AND HARBORS-HONOLULU, HAWAII, DISTRICT                                                                           1617
                                               Cost and financial summary

Cost of new work to June 30, 1937     --------------------                                                                  2 $680, 000. 00
Cost of maintenance to June 30, 1937-----_  ------------------                                                                      9, 259. 16

     Total cost of permanent work to June 30, 1937                                                                                89, 259. 16
                                                                                                                                 6------------
Minus accounts payable June 30, 1937__---------------

     Net total expenditures __-. ____________---
Unexpended balance June 30, 1937_________--------------
                                                                                                                       ------
                                                                                                                               2688,   533.18
                                                                                                                                      725. 98
                                                                                                                                      622. 99

             Total amount appropriated to June 30, 1937__---__------                                                            2 689, 348.   97

            Fiscal year ending June 30                                     1933           1934          1935            1936           1937


Cost of new work.----------..........------.........-----------$139, 887.49 $540, 112. 51
Cost of maintenance-.....--                   ----         ------------ ----------------------                        $4,713.1        $4,546. 66
Total expended__--.__-----------------                                        --- - -- 126, 664.81   488,351.40       69, 512.00       4,197.77

Allotted--------..--....-------------------------.......................          --   680,000. 00    15,000.00   1   12,848.97     -18,500.00

Balance unexpended July 1, 1936                                                                                                  23, 320. 76
                                                                                                                                 $-----------------
Deductions on account of revocation of allotment-------- ---                                                                      18, 500. 00

      Net amount to be accounted for-------------------------                                                                       4, 820. 76
Gross amount expended------------------ ----        $4, 202. 77
Less reimbursements collected -----------   ____          5. 00
                                                                                                                                    4,197. 77
      Balance unexpended June 30, 1937 ----------------------                                                                         622. 99
Outstanding liabilities June 30, 1937 --------------------------                                                                      533. 18
     Balance available June 30, 1937------------------- ------                                                                          89. 81
Amount allotted during July 1937---------------------------                                                                        24, 000.00
            Unobligated balance available June 30, 1937-------------                                                               24, 089.81

Amount that can be profitably expended       in fiscal year ending
June 30, 1939, for maintenance - - - - - - -- - -- -- - -- - - - - - - - - - - -                                                  15, 000. 00
   1 Public Works funds.
   s In addition $200,000 expended from contributed funds.
   S Exclusive of available funds.

                                        6. KAUNAKAKAI HARBOR, HAWAII

   Location.-This harbor is located centrally on the southern coast
of the island of Molokai, about 54 miles southeast of Honolulu. (See
U. S. Coast and Geodetic Survey Chart No. 4121.)
   Existing project.-This provides for dredging a harbor basin
about 1,500 feet long, 600 feet wide, and 23 feet deep at mean lower
low water.
   The range of tide between mean lower low water and mean higher
high water is 2.0 feet and the extreme tidal range for normal con-
ditions is about 2.5 feet.
   The estimate of cost for new work, made in 1933, was $120,000.
The estimate of cost for annual maintenance, made in 1933, is $5,000.
   The existing project was authorized by the Public Works Admin-
istration, September 6, 1933, and adopted by the River and Harbor
Act of August 30, 1935 (H. Doc. No. 35, 73d Cong., 1st sess.). The
latest published map is in that document.
   Local cooperation.-Fully complied with.
1618          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Terminal facilities.-There is one territorially owned reinforced
concrete wharf open to all on equal terms. The facilities are con-
sidered adequate.
   Operations and results during fiscal year.-Miscellaneous surveys
and routine work cost $1,203.57 for maintenance. The total expendi-
tures were $1,203.57.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934. The controlling depth in April 1937 was 23 feet.
   The cost of the existing project to June 30, 1937, was $106,117.59,
of which $103,200 (Public Works funds) was for new work and
$2,917.59 for maintenance. The total expenditures were $106,117.59.
  Proposed operations.-The balance unexpended July 1, 1937, in-
cluding accounts receivable, together with an allotment of $10,000
made during July 1937 will be applied as follows:
Reported for revocation from 1937 allotment----------------------- $500. 00
Maintenance: Dredging harbor basin by Government dredge, includ-
ing surveys, February 1938------------------------------------10, 035. 81
         Total -------                   ------------------------------                                   10,    535. 81
  No additional funds can be profitably expended during the fiscal
year 1939.
                                      Cost and financial summary
Cost of new work to June 30, 1937 ----------
                                   _                                                                1   $103, 200. 00
Cost of maintenance to June 30, 1937 _______--____________                                                 2, 917. 59

            Total cost of permanent work to June 30, 1937___
                                                           ------                              --        106, 117. 59

Net total expenditures                                                                                   106, 117. 59
Unexpended balance June 30, 1937 -------------------------                                                       535. 81

         Total amount appropriated to June 30, 1937---------------                                       106. 653. 40

         Fiscal year ending June 30                  1933        1934          1935            1936              1937


Cost of new work .....
                    _____     -_____.________$103,                107. 28       $92. 72    .
Cost of maintenance_          -            ----------       ------------ -------- $1,714. 02                    $1,203.57
Total expended_--------------___ .103,   ------ ___               107. 28  92. 72  1,714.02                      1,203. 57
Allotted.          .         --------                         103, 200. 00   10, 000. 00   -2, 546. 60          -4, 000.00


Balance unexpended July 1, 1936----------- ------------                                                   $5, 739. 38
Deductions on account of revocation of allotment----------------                                           4, 000. 00

      Net amount to be accounted for---------------------------                                            1, 739. 38
Gross amount expended_----------------------------------------                                             1, 203. 57

    Balance unexpended June 30, 1937_                                                                            535. 81
Amount allotted from War Department Civil Appropriation Act
   approved July 19, 1937                                                                                  0, 000. 00
                                                                                                          1--------------

       Balance available for fiscal year 1938                                                              0, 535. 81
                                                                                                          1---------------------
  1 Public Works Funds.
                                   7. WAKE ISLAND HARBOR

  Location. This harbor is at Wake Island, an atoll in the Pacific
Ocean about 2,000 nautical miles west of Honolulu, T. H., and 2,700
miles east of Manila, P. I. (See U. S. Navy Hydrographic Chart
No. 162.)
       RIVERS AND HARBORS-HONOLULU,               HAWAII, DISTRICT      1619
   Existing project.-This provides for an entrance channel 18 feet
deep and 200 feet wide from deep water in the Pacific Ocean to
a turning basin of the same depth an.d 1,000 feet square just south
of Peale Island; the channel dimensions to be suitably increased at
the entrance and its exact location to be fixed as may be found
advisable by the Chief of Engineers.
   The plane of reference is mean lower low water. The range of
tide between mean lower low water and mean higher high water is
about 21/2 feet.
   The estimate of cost for new work, made in 1936, is $1,000,000.
The latest (1936) approved estimate for annual cost of maintenance
is $38,000.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 84, 75th Cong., 1st sess.). This
document contains the latest published map.
   Terminal facilities.-The Pan American Airways Co. has a pier
on the lagoon shore of Peale Island for the use of its seaplanes and
small boats, and has under consideration the construction of a per-
manent pier at the same general location for handling cargo. The
pier will be adequate for docking the supply ship.
   Operation and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing project. The controlling depths at mean lower low water
in 1936 were 0 in the outer 2,000-foot section of the entrance channel,
7 feet in the remainder of the entrance channel, and 9 feet in the
turning basin.
   Proposed operations.-No funds are available and no operations
are proposed for the fiscal year 1938.
   The sum of $700,000 can be profitably expended for new work
during the fiscal year 1939, for camp construction, plant procurement
and dredging entrance channel by Government plant and hired labor.
                         Cost and financial summary

Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion of
existing project---------------------------                      $1,000, 000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work-----------------------------------------      700, 000

                  8. WELLES HARBOR, MIDWAY ISLAND

   Location.-This harbor is at Midway Island, an atoll in the Pacific
Ocean about 1,140 miles west of Honolulu, T. H., and 1,090 miles east
of Wake Island. (See U. S. Navy Hydrographic Charts Nos. 1952
and 2468.)
   Existing project.-This provides for an entrance channel from
deep water in the Pacific Ocean through the southerly reef to deep
water inside the lagoon, ending in a harbor basin approximately
1,200 feet square, with widths in the entrance channel decreasing
from 500 feet at the seaward end to 200 feet in a distance of 1,000
feet, continuing at the latter width to the basin, a further distance of
5,500 feet, with depths of 22 feet in the outer 1,500 feet of the en-
trance channel and 20 feet in the remainder of the channel and the
basin; and for a seaplane basin about 1,200 feet square and 8 feet
1620         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

deep at the northeast end of Sand Island, protected by suitable break-
waters with a flared entrance channel of the same depth.
    The plane of reference is mean lower low water. The mean range
of tide between mean lower low water and mean higher high water is
about 2 feet.
    The estimate of cost for new work, made in 1936, is $1,041,000. The
latest (1936) approved estimate for annual cost of maintenance is
$30,000.
    The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 49, 75th Cong., 1st sess.) which
provided for the entrance channel and harbor basin; and (Rivers and
Harbors Committee Doc. No. 9, 75th Cong., 1st sess.) which provided
for the seaplane basin, entrance channel thereto, and the breakwaters.
For latest published maps see the project documents.
    Terminal facilities.-Two commercial companies have built small
piers for landing supplies. The Pan American Airways Co. has
started construction of a breakwater and pier for use in connec-
tion with lighterage operations, and proposes to construct a pier
suitable for docking and unloading supply ships. These facilities
are considered adequate.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under the
existing project. The controlling depths at mean lower low water
in 1936 were about 1 foot in the harbor entrance channel, 15 feet in
the harbor basin, 0 in the seaplane basin, and 5 feet in the seaplane-
basin entrance channel.
   Proposed operations.-No funds are available and no operations
are proposed for the fiscal year 1938.
   The sum of $1,041,000 can be profitably expended for new work
during the fiscal year 1939 for dredging the harbor and seaplane
basins and entrance channels thereto and constructing the break-
waters by contract.
                                   Cost and financial summary

Total amount appropriated to June 30, 1937___________________
Amount (estimated) required to be appropriated for completion of
  existing    project_-----------------------__---                         $1,041,    000
Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work                                                       , 041, 000
                                                                             1-------------------------------
   9. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                        (GENERAL)

   The cost and expenditures during the year were $3,328.21. The
balance unexpended at the end of the year, together with an allot-
ment of $3,000 made during July 1937, totaling $6,848.88, will be
reduced by $3,200 reported for revocation from the 1937 allotment
and the balance applied during the fiscal year 1938 to payment of
expenses to be incurred under this heading. The additional sum of
$3,000 can be profitably expended during the fiscal year 1939.
                                   Cost and financial summary
Cost of new work to June 30, 1937__________________________
Cost of maintenance to June 30, 1937_ ___ _                 _              $53, 685. 70
       Total cost of permanent work to June 30, 1937-            -
                                                                __-   --    53, 685. 70
          RIVERS AND HARBORS-HONOLULU, HAWAII, DISTRICT                                                                  1621
Net total expenditures-----------------------------------------$53, 685. 70
Unexpended balance June 30, 1937-------    ---------------------   3, 848. 88

        Total amount appropriated to June 30, 1937-------------                                                     57, 534. 5S

        Fiscal year ending June 30                  1933              1934               1935           1936             1937

Cost of new work __         -----. --.    .....--
Cost of maintenance .--.----------------- $1, 973.89                $2, 780. 73
                                                                                           --
                                                                                     $2, 342.30
                                                                                                      ---------
                                                                                                     $16, 917.21
                                                                                                                      ----$3, 328. 21
Total expended---------------------------          1, 997. 57        2, 780. 73       2,342.30        16, 917. 21        3, 328. 21
Allotted_-----------------------------             2,000.00          6,534.58         3,000.00        19, 500.00--....

Balance unexpended July 1, 1936--                       ___
                                             ..-----------                                                          $7,177. 09
Gross amount expended ------   -  - --   -__ __-$3, 333.21
Less reimbursements collected_________---__                5.00
                                                                                                                     3, 328. 21

     Balance unexpended June 30, 1937_----------- ----                                                               3, 848. 88
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937_--------------------------------------                                                         3, 000. 00.

      Balance available for fiscal year 1938______________                                                           6, 848. 88
Amount that can be profitably expended in fiscal year ending June
30, 1939 for maintenance 1__-_______                                                                                3, 000. 00
  1 Exclusive of available funds.

                10. PLANT ALLOTMENT FOR HONOLULU DISTRICT

                                    Cost and financial summary
Undistributed costs June 30, 1937________________-                    $29, 719. 27
                                                              -______-__
Plus accounts receivable June 30, 1937 ___    __--------__---              184. 48
     Gross total costs to June 30, 1937___- __- _______-      -__-  29, 903. 75
Minus accounts payable June 30, 1937 _____-        -     -___________ 8, 315. 46
     Net total expenditures _____ .________                                    -             -_____- -              21, 588. 29
Unexpended balance June 30, 1937_______ __                                   _____-          ______ _                9, 469. 56
        Total amount appropriated to June 30, 1937___-                                            _____-
                                                                                                  -31,                 057. 85

   Fiscal year ending June 30             1933               1934                 1935               1936              1937


Total expended----........._____. ___.....            ....                    $48, 793.79       -$24, 374.82          -$2, 830. 68
Allotted-----      ------..-------------------.....-------------...            52, 959. 37        -26, 849. 40           4, 947. 88


Balance unexpended July 1, 1936             -----                                                                   $1, 691. 00
Amount allotted from War Department Appropriation Act approved
  Apr. 9, 1935--------------------------------------------------                                                     4, 947. 88
      Amount to be accounted for ---         _ ----------
                                                   __      ___--__-__--                                              6, 638. 88
Gross amount expended_----          -__--_--         -    _ $82, 748. 87
Less reimbursements collected___---          --
                                          ______---           85, 579. 55
                                                                                                                   -2, 830.68

     Balance unexpended June 30, 1937--------------------------                                                      9, 469. 56
Outstanding liabilities June 30, 1937------------- ----------------                                                  8, 315. 46
     Balance available June 30, 1937----------------------------1, 154. 10
Accounts receivable June 30, 1937-----184.                              48

        Unobligated balance available June 30, 1937 ------------                                                     1. 338. 58
1622         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


Status of reports called for by river and harbor acts and committee resolutions

         Locality                  Authorization Act         to Congress             Document no.                  Redommen-


Hilo Harbor, Hawaii,         River and Harbor Act,
prevention of shoaling            Aug. 26, 1937.
  by flow of lava.
Hilo Harbor, Hawaii....      River and Harbor Act,           Nov. 18,1936      _.__.--------------                Unfavorable.
                               Aug. 30, 1935.
Kaumalapau Harbor,           Rivers and Harbors              Mar.   5,1937 _--------            ---                    Do.
Hawaii.                       Committee resolu-
                                 tion, Jan. 14, 1936.
Kaunakakai Harbor,          ....    do.............----      Nov. 17,1936      ..........-------------------            Do.
Hawaii.
Keehi Lagoon, Hono-          River and Harbor Act,----------
                                                 ....---------------------
lulu, for seaplane har-           Aug. 26, 1937.
bor.
Nawiliwili Harbor, Ha-       Rivers       and Harbors        Dec. 16,1936            ....
                                                                               __________                  ..-------------Do.
waii.                             Committee resolu-
                               tion, Jan. 14, 1936.
Port Allen, Hawaii-......    River and Harbor Act, Jan.             5,1937      ----------------                       Do.
                               Aug. 30, 1935.
Wake Island-----.....            do.....--------------July
                              ...--                                 2, 1936     House, 84. 75th Cong.,            Favorable.
                                                                                  1st sess.
Welles Harbor, Midway       ....     do--.......                 doH........      ouse, 49, 75th Cong.,                 Do.
Island.                                                                          1st sess
         -Rivers
   Do..............___                    and Harbors        Nov.   6,1936      Rivers and Harbors                     Do.
                                   Committee resolu-                              Committee, 9, 75th
                                   tion, Aug. 10, 1936.                           Cong.. 1st sess.



IMPROVEMENT OF RIVERS AND HARBORS                                                                                IN THE
           PUERTO RICO DISTRICT
   The district includes the rivers and harbors of Puerto Rico,
Virgin Islands, and other nearby islands, also the construction of
certain roads and bridges and reclamation of swamp areas on the
island of Puerto Rico, and reclamation of swamp areas on the Virgin
Islands.
   District engineer: Lt. Col. D. McCoach, Jr., Corps of Engineers,
to July 20, 1936; Maj. H. G. Fairbanks, Corps of Engineers, acting
district engineer since that date.
   Division engineer: Col. E. D. Peek, Corps of Engineers.
                                                    IMPROVEMENTS

                                                          Page                                                                  Page
1. San Juan Harbor, Puerto                                 6. St. Thomas Harbor, Virgin
     Rico-                                            1622       Islands      *                                                 1632
2. Ponce Harbor, Puerto Rico _                        1626  7. Examinations, surveys, and
3. Mayaguez    Harbor,   Puerto                                   contingencies (general)_ __                                   1633
                                                            8. Plant allotment__----                                            1634
     Rico -     --                                    1628  9. Construction of roads and
4. Arecibo Harbor, Puerto Rico_                       1630                 bridges_             --        ----                  1635
5. Guayanes Harbor, Yabucoa,                                     10. Reclamation of swamp areas,
     Puerto Rico-_                                    1631            Puerto Rico___________                                    1636

                                       1. SAN JUAN HARBOR, P. R.

  Location.-The harbor is located on the north coast of Puerto
Rico, about 30 miles westward of Cape San Juan. (See U. S. Coast
and Geodetic Survey Chart No. 908.)
  Previous projects.-Before the American occupation about
$647,000 had been expended under Spanish administration. The
original project by the United States was authorized by the River
          RIVERS AND HARBORS-PUERTO         RICO DISTRICT       1623
and Harbor Act of March 2, 1907. The cost and expenditure on
the project adopted by the United States were $747,684.28 for new
work and $44,730.86 for maintenance, a total of $792,415.14. (For
further details see p. 2007, Annual Report for 1915, and p. 1718 of
Annual Report for 1916.)
   Existing project.-This provides for an entrance channel 800
feet wide and 38 feet deep at mean low water across the outer bar,
a distance of about 1,700 feet, to the bend in the channel; thence
1,200 feet wide and 30 feet deep at mean low water, narrowing to
1,000 feet width at the inner harbor, about 4,000 feet distant from
the bend; dredging the inner harbor to the same depth over an
area of about 329 acres, and extending this depth easterly into the
San Antonio Channel for about 3,400 feet with a width of about
1,100 feet at its mouth, narrowing to 600 feet 1,200 feet from the
mouth, increasing to 800 feet at the easterly end. The mean tidal
range is about 1.1 feet, and the extreme varies between 0.4 and 1.8
feet.
   The estimated cost of new work, revised in 1937, is $3,139,000,
exclusive of amounts expended under previous projects but includ-
ing $100,000 to be contributed by local interests. The latest (1937)
approved estimate for annual cost of maintenance is $55,500.
   The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. No. 865, 63d Cong., 2d sess.) and modified
by the River and Harbor Act of September 22, 1922 (H. Rept. No.
775, 67th Cong., 2d sess.); the River and Harbor Act of August 30,
1935 (Rivers and Harbors Committee Doc. No. 38, 74th Cong., 1st
sess.) provided for 38 feet depth at the entrance and increasing the
anchorage area to 239 acres, and the River and Harbor Act of August
26, 1937 (Rivers and Harbors Committee Doc. No. 42, 75th Cong., 1st
sess.), authorized present project widths in the Anegado Reach be-
tween the entrance channel and the anchorage basin and increased
the anchorage area to 329 acres. The River and Harbor Act ap-
proved July 3, 1930, modified the conditions of local cooperation.
The latest published map is printed in the Rivers and Harbors Com-
mittee Document No. 42, Seventy-fifth Congress, first session.
   Local cooperation.-All conditions of local cooperation imposed by
the River and Harbor Act approved August 30, 1935, and preceding
acts have been complied with. The River and Harbor Act of August
26, 1937, requires local interests to contribute $100,000 toward the
cost of the improvement, convey to the United States, without cost,
4 acres of land at Miraflores Bay having a suitable road connection
to the highway system, furnish, free of cost to the United States,
suitable bulkheaded disposal areas for new work and for subsequent
maintenance as required, and release the United States from liability.
for any damages incidental to the work of improvement. None of
these conditions has been met.
   Terminal facilities.-There are six piers with aggregate berthing
space of about 6,530 feet and bulkhead wharves of an aggregate
length of about 3,750 feet on the northerly side of San Juan Harbor,
including San Antonio Channel, capable of docking deep-draft ves-
sels. For further details see Port Series No. 21, Corps of Engineers.
   Operations and results durinq fiscal year.--Regular funds: Super-
vision of navigable waters of Puerto Rico and maintenance of the
1624        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

United States Engineer suboffice at San Juan, P. R., and preserva-
tion and repair of buildings and grounds were continued. The total
cost was $7,669.59 for maintenance from regular funds. Accounts
payable due at the beginning of the fiscal year under Public Works
funds were paid during the year. The total expenditures were
$15,847.13, of which $7,041.61 was from regular funds and $8,805.52
was from Public Works funds.
   Condition at end of fiscal year.-The project, as modified in 1935,
is about 80 percent completed. The controlling depth in the entrance
channel on June 30, 1935, was 38 feet at mean low water at the outer
end, thence 30 feet in the remainder of the entrance channel and in
the main harbor and the San Antonio Channel, except for a few
scattered shoals varying between 28 and 30 feet in the anchorage area.
   The work remaining to be done to complete the project consists of
dredging and removing coral rock to widen this entrance channel and
dredging the balance of the anchorage basin.
   The costs under the existing project from regular funds were
$1,825,162.45 for new work and $533,102 for maintenance, a total of
$2,358,264.45. Expenditures were $2,358,052.49. The costs and ex-
penditures under Public Works funds were $427,068.34 for new work
and $24,737.18 for maintenance, a total of $451,805.52. The total
costs of the existing project from all funds were $2,252,230.79 for new
work and $557,839.18 for maintenance, a total of $2,810,069.97. The
expenditures under all funds were $2,809,858.01.
   Proposed operations.-It is proposed to apply the funds unex-
pended and accounts receivable on June 30, 1937, together with an
allotment of $10,000, made during July 1937, a total of $10,813.06
to accounts payable and to maintenance of the San Juan Office,
and repair of buildings and grounds assigned to the Engineer
Department.
   The additional sum of $897,000, including $100,000 to be con-
tributed by local interests, can be profitably expended during the
fiscal year 1939, as follows:
New work: Dredging and rock removal to complete the entrance
  channel and the anchorage area of the main harbor (July 1938
to June 1939)   _        --------------------------               $887, 000
Maintenance: Preservation and repair of buildings, structures, and
  grounds assigned to the Engineer Department -------------------    10, 000
       Total---------------------------------------------                 897, 000
                                   Cost and financial summary
                           MAINTENANCE AND IMPROVEMENT      FUNDS

Cost of new work to June 30, 1937----------------------------$2,      572, 846. 73
Cost of maintenance to June 30, 1937--------------------              577, 832. 86

      Total cost of permanent work to June 30, 1937-    - 3, 150, 679. 59
Plus accounts receivable June 30, 1937------------------------      2. 50

      Gross total costs to June 30, 1937--------------------3, 150, 682. 09
Minuss accounts payable June 30, 1937-------------------------      214. 46

       Net total expenditures ------------------------------        3, 150, 467. 63
Unexl pended balance June 30, 1937 ----------------------------             810. 56
       Total amount appropriated to June 30, 1937 ____________3. 151. 278. 19
                     RIVERS AND HARBORS-PUERTO                                                        RICO DISTRICT                                  1625

     Fiscal year ending June 30                             1933                 1934                  1935                   1936                 1937


Cost of new work---.... ----------------                                                       -----------------------------------
Cost of maintenance...--.....--.         $28, 258. 27                           $2, 126. 63           $3, 153. 13           $45, 034.09            $7, 669. 59
Total expended-----------------                            20, 426. 38           4, 525. 55          -6, 922. 79             42, 813. 89             7, 041. 61
Allotted------.-----------------                            -657. 44            11, 862. 81          -6, 591. 28             35, 000. 00 -----------


Balance unexpended July 1, 1936_ _ _-                                                        _ _                                              $7, 852. 17
Gross amount expended                                       -----------------                                 $14, 215. 21
Less-
        Reimbursements                    collected---                                       $7, 172.35
        Receipts from sales                                        -                                 1. 25
                                                                                                                7, 173. 60
                                                                                                                                                7, 041. 61

      Balance unexpended June 30, 1937 -------                                                                                                      810. 56
Outstanding liabilities June 30, 1.937---------------------------                                                                                   696. 47

      Balance available June 30, 1937-------------------------                                                                                     114. 09
Accounts receivable June 30, 1937------------------------------                                                                                      2. 50

     Unobligated balance available June 30, 1937                                                                                                    116. 59
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-----------------__ _--------------------                                                                              10, 000.00

     Balance available for fiscal year 1938-------------------                                                                                10, 116. 59
Amount (estimated) required to be appropriated for completion
                                       1 2
    of existing project                                       -           --            --            _---          -----                    787, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: 1
       For new work                                                                                                                           87, 000. 00
                                                                                                                                             7-----------------
       For maintenance                   1--------------                                                                                      10, 000. 00

            Total 1                                                                                                                        797,000.00
   1 Exclusive of available funds.
   2 In addition, $100,000 to be contributed by local interests.

                                                            PUBLIC        WORKS FUNDS


Cost of new work to June 30, 1937____-- -                                                                                            _ $427, 068.34
Cost of maintenance to June 30, 1937_ __________                                                                                              24, 737. 18

      Total cost of permanent work to June 30, 1937_                                                                                       451, 805.52
Net total expenditures_                                                                                                                    451, 805. 52

           Total amount appropriated to June 30, 1937_____                                                                                 451, 805.52

           Fiscal year ending June 30                                    1933                 1934            1935                1936               1937


Cost of new work-.                     _....--------------------------..                                   $214, 195. 99 $212, 872. 35 ............
Cost of maintenance ..               ......                     .......-------------- -----------.........
                                                                              ....----------                 24, 737. 18               .

        Total cost_                                                __.-..--.-_._------.---238, 933.17                            872.35
                                                                                                                              212,
Total expended ....---------------------------------                                                     205, 733. 55         237, 266.45          $8. 805. 52

Allotted          ---------------------------------------------                                          443, 000. 00           8, 805. 52


Balance unexpended July 1, 1936-------------------------------                                                                                $8, 805. 52
Gross amount expended------   --     _-----_______        -__                                                                                  8, 805. 52
1626          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

      CONSOLIDATED          COST AND FINANCIAL SUMMARY FOR SAN JUAN                                            HARBOR, P. R.

Cost of new work to June 30, 1937-----------------------------                                                      $2, 999, 915. 07
Cost of maintenance to June 30, 1937--------------------------                                                          602, 570. 04

      Total cost of permanent work to June 30, 1937- -----------                                                     3, 602, 485. 11
Plus accounts receivable June 30, 1937_
                                      --------------------------                                                               2. 50

      Gross total costs to June 30, 1937------------------------                                                      3, 602, 487. 61
Minus accounts payable June 30, 1937--------------------------                                                                214.46

     Net total expenditures----------------------------------3, 602, 273. 15
Unexpended balance June 30, 1937__
                                ------------------------------       810. 56

        Total amount appropriated to June 30, 1937--------------3, 603, 083. 71

         Fiscal year ending June 30                        1933               1934           1935                1936              1937


Cost of new work......._       _______.___________ ________..   __$214, 195. 99                           $212, 872. 35      --
Cost of maintenance....------------------ $28, 258. 27 $2, 126. 63   27, 890. 31                            45, 034. 09           $7, 669. 59

      Total cost.__ --------.--       _____              28, 258. 27         2, 126. 63   242, 086. 30        257, 906. 44         7, 669. 59

Total expended--___        -----.---.----.--             20, 426. 38         4, 525. 55   198, 810. 76    280, 080. 34            15, 847. 13

Allotted_--_------------ ----.----                      - -657. 44          11, 862. 81   436, 408.72         43, 805. 52    -
Balance unexpended July 1, 1936-------------------------------- $16, 657. 69
Gross amount expended------------------------------$23, 020. 73
Less:
    Reimbursements collected---------------$7, 172. 35
      Receipts from sales_                    _            --          --                 1. 25
                                                                                                     7,173.60
                                                                                                                             15, 847. 13

      Balance unexpended June 30, 1937_----------                                                                                 810. 56
Outstanding liabilities June 30, 1937------------------------------                                                               696. 47
      Balance available June 30, 1937---------------__ ---------                                                                  114. 09
Accounts receivable June 30, 1937 ---------------------------------                                                                 2. 50

     Unobligated balance available June 30, 1937- -----------------                                                               116. 59
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937------------------------------------------                                                              10, 000. 00
         Balance available for fiscal year 1938-----------------------                                                       10, 116. 59
Amount (estimated) required to be appropriated for completion of
   existing      project          2-----------------                                                                     787, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1939 :      2-- -- -- - 1                    -- -- -- - -- -- -- -- - -- -- -- --
      For new work                2                                                                      __         __ 787, 000. 00
      For maintenance                 ------------------------------------------- 10, 000. 00
          Total 122- - -    -- --- --- --- -- --- -- --- -- -- --- -- -- --- --                      -- -- --- -
                                                                                                                        797, 000.00
   1 Exclusive of available funds.
   2In addition, $100,000 to be contributed by local interests.

                                            2. PONCE HARBOR, P. R.

   Location.-Ponce Harbor is located on the south central coast of
Puerto Rico. (See U. S. Coast and Geodetic Survey Chart No. 927.)
   Existing project.-This provides for a sea wall of an aggregated
length of 2,362 feet, extending 2,000 feet along the causeway easterly
of the municipal pier and about 362 feet westerly from the municipal
          RIVERS AND HARBORS-PUERTO RICO DISTRICT                  1627
pier across a coral reef to deep water in the harbor; a bulkhead sur-
mounted by a suitable concrete platform to be constructed under the
protection afforded by the sea wall, of an aggregate length of 6,690
feet, 2,870 feet to be designed for water 30 feet in depth, 1,470 feet
to be designed for water 18 feet in depth, and 2,350 feet to be designed
for water 9 feet in depth; and dredging three areas, 30, 18, and 9 feet
in depth channelward of the bulkheads, containing approximately 77,
47, and 29 acres,. respectively. The mean tidal range is one-tenth of a
foot, and the range of the great tropic tides is nine-tenths of a foot.
   The estimate of cost of new work, revised in 1935, is $1,016,000, of
which $542,039.70 is to be contributed by local interests. The latest
 (1922) approved estimate of annual cost of maintenance is $30,000.
    The existing project was adopted by the River and Harbor Act
approved March 3, 1925 (H. Doc. No. 532, 67th Cong., 4th sess.), and
modified by River and Harbor Act of August 30, 1935, to provide for
dredging by the United States without contribution by local interests,
the reimbursement to local interests of funds previously advanced and
contributed for such dredging, and all other portions of the improve-
ment hereafter to be at the expense of local interests (Rivers and
Harbors Committee Doc. No. 18, 72d Cong., 1st sess.). The latest
published map is in the latter document.
   Local cooperation.-The project adopted by the act of March 3,
1925, as modified by the act of August 30, 1935, provides that the
United States shall undertake, without contribution from local inter-
ests, the dredging included in the project, and return to local interests
funds contributed and advanced for such dredging all other portions
of the improvement hereafter to be at the expense of local interests.
    Terminal facilities.--There is one pier of modern design and a
bulkhead wharf in the harbor. The pier is located at Penoncillo
Point and owned by the municipality of Ponce. The bulkhead wharf,
1,890 feet long, has been constructed under the supervision of the
insular government. The transfer facilities when completed are con-
sidered adequate for the present needs of commerce.
   Operations and results during fiscal year.-None. In accordance
with River and Harbor Act of August 30, 1935, reimbursement of
$77,166.65 was made to the municipality of Ponce for funds prev-
iously advanced for dredging. The costs and expenditures during the
fiscal year from regular funds were $77,166.65, all for new work.
   Condition at end of fiscal year.-The work that has been done at
the jdint expense of the United States and local interests, estimated
to cost $508,000, is about 60 percent completed. The work now
planned under the project does not contemplate completion of all the
work authorized but is confined to the 30-foot maneuvering and
berthing area and the bulkhead wharf and sea wall adjacent thereto.
At the close of the fiscal year the maneuvering and berthing area
adjacent to the new bulkhead wharf, varying from 900 to 1,300 feet
wide, had been dredged to a depth of 30 feet at mean low water to
within 20 feet of the face of the new bulkhead wharf, except for a
section about 500 feet long and 100 feet wide, 400 feet from its west-
erly end, where partial failure of the wharf occurred in August
1931. Local interests have completed a section of bulkhead wharf,
about 1,500 feet long on the southerly side of the 30-foot dredged area,
and connected its easterly end with the causeway leading to the old
municipal pier by means of a riprap bulkhead.
1628              REPORT OF' CHIEF OF ENGINEERS, U. S. ARMY, 1937

  There remains to be done, to complete the entire project, dredging
by the United States of two areas to depths of 18 and 9 feet, contain-
ing approximately 47 and 29 acres, respectively. There remains to
be constructed by the city of Ponce, to complete the project, a sea
wall 2,000 feet long, and about 970 linear feet of bulkhead for 30-foot
depth, 1,470 linear feet for 18-foot depth, and 2,350 linear feet for
9-foot depth.
  The total costs and expenditures exclusive of $21,960.30 contributed
funds which were expended for new work, were $213,607.28, of which
$176,293.60 was for new work and $37,313.68 for maintenance.
  Proposed operations.-No funds were available on June 30, 1937,
and no work is contemplated during the fiscal year 1938.
  The sum of $90,000 can be profitably expended during the fiscal
year 1939, in maintenance dredging to restore project dimensions in
the anchorage and maneuvering area adjacent to the concrete bulk-
head wharf.
                                                 Cost and financial summary

Cost of new work to June 30, 1937 -------                                             -                         -$176,         293. 60
Cost of maintenance to June 30, 1937                                          ------------------                            37, 313. 68

      Total cost of permanent work to June 30, 1937                                                ------------        213, 607. 28
Net total expenditures---------- ------------------------------                                                        213, 607. 28
Total amount appropriated to June 30, 1937---------------------                                                        213, 607. 28

           Fiscal year ending June 30                             1933             1934               1935     1936             1937


Cost of new work--------------- ------ $1, 700. 85 --------------------------------                                           $77, 166. 5
Cost of maintenance---.----.. ------------ 5, 938. 06  $103. 52 ..             $89. 20

        Total cost--.....             ...---------------------   7, 638. 91    1    03.52------------              89. 20      77, 166. 65
Total expended--.....-----.............------------------        7, 682. 90        112.92------------........89.      20       77, 166. 65
Allotted....................-----------------------              2, 355. 89         -4. 46       ......      79,128. 90       -1, 873. 05


Balance unexpended July 1, 1936_-__        --
                                      _____________      ___
                                                       ___---  __ $79, 039. 70
Deductions on account of revocation of allotment _______________ -   1, 873. 05
           Net amount to be accounted for                                           ----------                              77, 166. 65
Gross amount expended----------------------------------77,                                                                     166. 65
Amount (estimated) required to be appropriated for completion of
    existing project 2                 -------                                                                          298, 000. 00
Amount that can be profitably expended in fiscal year ending June
                             - - -- - - - - - - - -
30, 1939, for maintenance 2 __ _____             ______ ___ __ _                                                           90, 000. 00
   1 Exclusive of $21,960.30 contributed funds.
    2 Exclusive of available funds.
   * In addition $542,039.70 to be contributed by local interests.

                                            3. MAYAGUEZ HARBOR, P. R.

   Location.-The harbor is located at about the center of the west
coast of Puerto Rico. The harbor lies between Point Algorrobo and
Point Guanajibo, about 334 miles apart, and extensive coral reefs
about 2 miles offshore. (See U. S. Coast and Geodetic Survey Chart
No. 901.)
   Existing project.-This provides for a channel of approach to the
terminal, 30 feet deep, with a width of 500 feet from its inshore end
to a point opposite the westerly end of the terminal, thence increasing
in width to 1,000 feet at the 30-foot contour.
                      RIVERS AND HARBORS-PUERTO                                            RICO DISTRICT                     1629
   The estimate of cost for new work, made in 1932, was $179,000.
The latest (1935) approved estimate of cost for annual maintenance
is $3,000. The project was authorized by the Public Works Admin-
istration September 6, 1933, and adopted by the River and Harbor
Act of August 30, 1935 (H. Doc. No. 215, 72d Cong., 1st sess., and
Rivers and Harbors Committee Doc. No. 1, 73d Cong., 1st sess.).
The latest published map is in the former document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminals consist of three small piers
used by lighters, located in shoal water in the east central section of
the harbor, and a modern deep-water terminal consisting of a bulk-
head wharf about 1,270 feet in length, and a storage shed 60 by 600
feet immediately shoreward thereof, located in the northeast section
of the harbor.
   Operations and results during fiscal year.-An examination of the
proposed improvement was made at a total cost and expenditure of
$179.74, all for new work. In accordance with River and Harbor
Act of August 30, 1935, reimbursement of $20,820.26 was made for
work performed by local interests within the project area prior to
adoption of the existing project. The total costs and expenditures
were $21,000, from regular funds, all for new work.
   Condition at end of fiscal year.-The project was completed in
1934. The controlling depth throughout the project was about 30
feet at mean low water on June 30, 1937.
   The total costs and expenditures were $168,186.69, all for new
work, of which amount $21,000 was from regular funds and $147,-
186.69 was from Public Works funds.
   Proposed operations.-No funds were available on June 30, 1937,
and no work is contemplated during the fiscal year 1938.
   The sum of $15,000 can be profitably expended during the fiscal
year 1939, in maintenance dredging to restore project dimensions in
the approach channel and maneuvering area adjacent to the deep
water terminal.
                                                Cost and financial summary

Cost of new work to June 30, 1937-                                    186. 69
                                                               $---------------------168,
Cost of maintenance to June 30, 1937__________________________

      Total cost of permanent work to June 30, 1937------ ___- 1168,186. 69
Net total expenditures_ ___________________                     _-168, 186. 69
Total amount appropriated to June 30, 1937---------------------   1168, 186. 69

    Fiscal year ending June 30                       1933                1934              1935           1936             1937


Cost of new work--....--------- --------------                      $147, 182. 89      ---------------       $3.80           $21, 000
Cost of maintenance                                                                                          -
Total expended-------------..                          ...--------------....
                                                                        146, 273. 71        $906. 83          6. 15           21, 000
Allotted-----...............----------------------------....          179, 000. 00      -31, 813. 31     21,000. 00   ..


Balance unexpended July 1, 1936--------------------------------                                                       $21, 000. 00
Gross amount expended_-----------------------------      -      ___
                                                               -__                                                     21, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1939, for maintenance _-.---------                   --                                                          15, 000..00
  SIncludes $147,188.69 Public Works funds.
1630    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                       4. ARECIBO HARBOR, P. R.

   Location.-The harbor is located on the north shore of Puerto Rico
about 40 statute miles west of San Juan Harbor. (See U. S. Coast
and Geodetic Survey Chart No. 903.)
   Previous projects.-A previous project was authorized by the River
and Harbor Act approved August 30, 1935, subject to certain condi-
tions of local cooperation. Local interests were unable to comply with
these conditions and, further, the type of deep-water terminal pro-
posed was objectionable to navigation interests. As a result, no work
was done and no expenditures were made under the project. (For
further details see pp. 1619 and 1620 of annual report for 1936.)
   Existing project.-This provides for the construction of a stone
breakwater 1,200 feet long, extending from Point Morrillos to Cos-
inera Rock; dredging an entrance channel 25 feet deep at mean low
water and 400 feet wide, flared to 650 feet wide at the ocean entrance
and widened for the inner 650 feet of its length to form a maneuver-
ing area of the same depth fronting a proposed marginal wharf
1,000 feet in length.
   The estimate of cost for new work made in 1937 is $756,000, includ-
ing $288,000 to be contributed by local interests. The latest (1937)
approved estimate of cost for annual maintenance is $20,000. The
existing project was adopted by the River and Harbor Act of August
26, 1937 (Rivers and Harbors Committee Doc. No. 43, 75th Cong., 1st
sess.), which document contains the latest published map.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that local interests shall contribute $288,000 toward the initial
cost of the project, furnish, free of cost to the United States, suitable
spoil-disposal areas for new work and for subsequent maintenance as
required, and release the United States from all claims for damages
incidental to the work of improvement; and provides further, that
no work shall be done by the United States until local interests shall
have initiated the construction of a deep-water terminal and given
assurances satisfactory to the Secretary of War that they will com-
plete and maintain this terminal, open to all on equal terms, in ac-
cordance with plans to be approved by the Chief of Engineers and
the Secretary of War. None of these conditions has been met.
   Terminal facilities.-No facilities are available at Arecibo for
direct transfer of freight. Ships anchor in deep water in the ocean
about 1 mile from the lighterage terminal located between Signal Hill
and Lighthouse Hill and transfer cargo by means of seagoing
lighters. The lighterage terminal consists of an inner basin originally
dredged about 250 feet long, 150 feet wide, and 61/2 feet deep, a bulk-
head wharf about 500 feet long, two warehouses, 260 by 90 feet and
100 by 125 feet, respectively, and an entrance channel from the
harbor to the basin of a minimum width of 30 feet protected by
crib-work jetties.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been performed
under the project.
   Proposed operations.-No funds are available for this project and
no work is proposed during the fiscal year ending June 30, 1938.
   It is expected that the conditions of local cooperation will be com-
plied with during the fiscal year and that local interests will provide
                RIVERS AND HARBORS-PUERTO                       RICO DISTRICT      1631
the required contribution of $288,000. Therefore, the sum of $511,-
000, including $288,000 contributed funds, can be profitably expended
for new work during the fiscal year ending June 30, 1939, in con-
struction under contract of a stone breakwater from Point Morrillos
to Cosinera Rock.
                                         Cost and financial summary

Total amount appropriated to June 30, 1937
Amount (estimated) required to be appropriated for completion of
  existing project 1------------------                                          $468, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1939, for new work 1-----------------                                          223, 000
  1 In addition $288,000 required to be contributed by local interests.

                        5. GUAYANES HARBOR, YABUCOA, P. R.

   Location.-GuayanesHarbor is the port of Yabucoa and is located
on the southeast coast of Puerto Rico. (See U. S. Coast and Geodetic
Survey Charts Nos. 918, 904, and 920.)
   Existing project.-This provides for dredging a short approach
channel 23 feet deep at mean low water, 300 feet wide and an anchor-
age area 2,000 feet long by 1,300 feet wide of the same depth.
   The estimated cost of new work made in 1936 is $108,600, including
 $40,000 to be contributed by local interests, and the approved estimate
for annual cost of maintenance made in 1936 is $2,200.
   The project was adopted by the River and Harbor Act of August
26, 1937 (H. Doc. 243, 75th Cong., 1st sess.). The latest published
map is printed in that document.
   Local cooperation.-The act authorizing the project provides that
local interests shall contribute $40,000 toward the cost, and furnish,
free of cost to the United States, suitable spoil-disposal areas for new
work and subsequent maintenance as required, secure the United
States against all claims for damages incidental to the improvement,
and agree to provide wharfage facilities and access thereto from
the harbor with a depth of water suitable for use by lighters hav-
ing a draft of 8 feet. Local interests are prepared to meet these
requirements.
   Terminal facilities.-The Yabucoa Sugar Co. owns and operates,
as a private enterprise, a lighterage terminal for the shipment of raw
sugar and molasses, and for the receipt of general merchandise. The
terminal and transfer facilities consist of one pier for the handling of
sugar, one pier for general cargo, a pipe-line trestle for transferring
molasses from shore tanks to tank barges, a bulkhead. wharf
equipped with stiff-leg derrick of 15 tons capacity, a warehouse 220
feet long by 70 feet wide, a molasses tank of 1,000,000 gallons capac-
ity, and a gasoline tank of 80,000 gallons capacity. A narrow-gage
railroad connects these terminal facilities with the sugar mill owned
by the same company, and with the town of Yabucoa. A dirt road,
about 3.7 miles long, connects the terminal with the insular highway
system.
   The previously described piers and wharf have depths alongside of
from 4 to 5 feet at mean low water. At the pipe-line outlet there is
8 feet depth at mean low water.
   Operations and results during fiscal year.-None.
       20196--37-pt. 1-103
1632           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Condition at end of fiscal year.-No work has been performed
under the project, and there have been no costs or expenditures. The
controlling mean low-water depth in the project entrance channel was
20 feet for a width of 300 feet and in the anchorage area 18 feet, when
examined in May-June 1936.
  Proposed operations.-No funds are available for this project, and
no work is proposed during the fiscal year ending June 30, 1938.
   It is expected that the conditions of local cooperation will be .com-
plied with during the fiscal year and that local interests will provide
the required contribution of $40,000. Therefore, the sum of $108,600,
including $40,000 contributed funds, can be profitably expended for
new work during the fiscal year ending June 30, 1939, for dredging
under contract the entrance channel and anchorage area to dimen-
sions authorized by the River and Harbor Act of August 26, 1937.
                                  Cost and financial summary
Total amount appropriated to June 30, 1937----------------------                                    -
Amount (estimated) required to be appropriated                                    for completion of
                  1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
existing project                                                                              -    $68, 600
Amount that can be profitably expended in fiscal year ending June 30,
1939, for new work ----------------------------------- ---------- 68,600
  1   Ii   addition $40,000 required to be contributed by local interests.

                     6. ST. THOMAS HARBOR, VIRGIN ISLANDS

   Location.-St. Thomas Harbor is located in a well-sheltered bay
on the south shore of the island of St. Thomas, Virgin Islands. (See
U. S. Coast and Geodetic Charts Nos. 3240, 920, and 933.)
   Existing project.-This provides for removing Scorpion Rock at
the entrance of the harbor to a depth of 36 feet at mean low water;
dredging an entrance channel to this same depth and 600 feet wide;
dredging an anchorage area approximately 3,150 feet long and vary-
ing from 3,650 feet to 1,600 feet in width to a depth of 33 feet at
mean low water, and construction of a breakwater 700 feet long be-
tween Rupert Rock and the mainland.         The mean range of tides
is 0.6 foot. Irregular fluctuations due to storms and hurricanes
materially affect navigation; however, they do not occur frequently.
   The estimated cost of new work made in 1937 is $743,000, and
the approved estimate for annual cost of maintenance, made in 1937,
is $12,000.
   The project was adopted by the River and Harbor Act of August
26, 1937 (H. Doc. 200, 75th Cong., 1st sess.).    The latest published
map is printed in that document.
   Local cooperation.-Under the project local interests are required
to furnish, free of cost to the United States, necessary rights-of-way
and suitable spoil-disposal areas for new work and subsequent n.ainte-
nance as required, and release the United States from all claims for
damages attributable to the work of improvement. None of these
conditions has been met.
   Terminal facilities.-The only deep-water terminal in St. Thomas
Harbor is located in the easterly part of the harbor, and is owned
and operated by the West Indian Co., Ltd., a Danish corporation
with headquarters in Copenhagen, Denmark. This terminal is stated
to be a public-service terminal available to all on equal terms. The
             RIVERS AND HARBORS-PUERTO RICO DISTRICT                           1633
terminal consists of a steel sheet pile and concrete bulkhead wharf
2;250 feet long, with depths alongside ranging from 30 to 33 feet
at mean low water, except for the easterly 150 feet, where depths
range from 15 to 28 feet. On this wharf are commodious ware-
houses and a large area available for open storage. The terminal
is connected with the town by a good road. Although there are no
railroads on the island, motor transportation is available for handling
freight.
   Numerous small wharves and quays along the north shore of the
harbor serve as berths for the many small sailing vessels and motor
launches plying an active trade between St. Thomas and nearby
islands. These docks are owned both by private interests and by
the municipality; several are equipped with hand cranes for handling
heavy lifts; depth of water in the berths varies from 4 to 11 feet;
all are connected to the island highway system by well-paved roads.
   Operation and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been performed under
the project, and there has been no cost or expenditure. The con-
trolling mean low water depth when examined in August-September
1936 in the entrance channel was 32 feet for a width of 600 feet, over
Scorpion Rock 23 feet, and in the anchorage area the depth varied
from a minimum of 16 feet in the extreme northern portion, sloping
gradually to 33 feet south of the center of the area.
   Proposed operations.-No funds were available for this project
at the end of the fiscal year, and no work is proposed during the
fiscal year ending June 30, 1938.
   It is expected that the conditions of local cooperation will be coin-
plied with during the next 2 years. Therefore, the sum of $743,000
can be profitably expended during the fiscal year ending June 30,
1939, as follows:
New work :
   Complete, under contract, dredging of the entrance channel and
     anchorage area and removal of Scorpion Rock to project dimen-
    sions as authorized by the River and Harbor Act of 1937____ $670, 000
   Complete, under contract, the construction of the breakwater be-
     tween Rupert Rock and the mainland, as authorized by the
    River and Harbor Act of 1937------------------------------73,     000
                                                                              43
               Total                                                      7        , 000

                        Cost and financial summary
Total amount appropriated to June 30, 1937___   _________ -
Amount (estimated) required to be appropriated for completion of
  existing   project    -------                        ----------        $743, 000

Amount that can be profitably expended in fiscal year ending June
30, 1939, for new work_----------------------------------------          743, 000
   7. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                      (GENERAL)

  The cost of the work during the year was $17,048.26. The ex-
penditures were $17,239.51. The balance unexpended in the amount
of $99.68 will be applied in settlement of accounts payable June 30,
1937. The additional sum of $5,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1939.
 1634                     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                           Cost and financial summary

Cost of new work to June 30, 1937____,__                                                                                                 ----------
Cost of maintenance to June 30, 1937---- __-__-____-----_                                                                               $40, 607. 40
                 Total cost of permanent work to June 30, 1937 ____-- .__.                                                                    40, 607. 40

Net total expenditures------------------------------------------                                                                             40, 607.40
Unexpended balance June 30, 1937_                                                                                                                 9-----------------------
                                                                                                                                                   9968

                 Total amount appropriated to June 30, 1937------ -                                                             __--40, 707. 08

                Fiscal year ending June 30                                   1933             1934                1935            1936               1937
Cost of new work __............ _____-____                                                                                                             ____
          Cost~~ ofnwwr-------------- ------------ ------------ ------------                                                                   -------
Cost of maintenance.....-----------...                                   $2,826.48          $3, 549.13       $4,389. 29         $3, 246.76       $17,048. 26

Total expended-                      -------------------                   2, 823.10         3, 401.64           4, 539. 89      3, 057. 52         17, 239. 51

Allotted-----..................---            .........----------------........
                                                                             7, 306. 60      4, 877. 43          5, 000. 00      5, 000. 00          8, 373. 05


Balance unexpended July 1, 1936__ ___________--    __ -- ____-___                                                                             $8, 966. 14
Amount allotted from War Department Appropriation Act approved
  May 15, 1936 -----------------------------------                                                                                             8, 373. 05
       Amount to be accounted for--------------------------------17, 339. 19
Gross amount expended----------____---------          $17, 625. 63
Less reimbursements collected ------   ___-_-__            386. 12
                                                                    -17, 239.51

       Balance unexpended June 30, 1937 ______- -- , --- ______                                                                                -_    99. 68
Outstanding liabilities June 30, 1937----------     --------                                                                                        99. 68
Amount that can be profitably    expended in fiscal year ending June
                                1
  30, 1939, for maintenance ______________________________          __                                                                         5, 000. 00
  1 Exclusive of available funds.

                         8. PLANT ALLOTMENT FOR PUERTO RICO DISTRICT

                                                           Cost and financial summary

Undistributed costs June 30, 1937_ __-- __- _____-_____      _   $14,420.04
Plus accounts receivable June 30, 1937__-- --   __   -____-______    160. 41
       Gross total costs to June 30, 1937--------------------------                                                                           14, 580. 45
Minus accounts payable June 30, 1937_-_-.-                 _--___
                                                         -___                                                                                  -13.00
      Net total expenditures___________________                                                                          _____             14, 567. 45
Unexpended balance June 30, 1937_--_ ------- __-                                                                                           1__________
                                                                                                                                      -____ 1, 773. 83
                 Total amount appropriated to June 30, 1937-___---                                                             _____-16, 341.28

       Fiscal year ending June 30                               1933                 1934                 1935                 1936                 1937


Total expended                   ----------------.................
                                                  ............................                       $10, 699. 95         -$2, 428. 07              $6, 295. 57
Allotted. --                   ---------------------------------------                                14, 341.28 ..............                      2, 000. 00


Balance unexpended July 1, 1936---------------------------__ $6, 069. 40
Amount allotted from War Department Appropriation Act approved
   May 15, 1936------------------------------------------------- 3, 000. 00

       Amount to be accounted for_-......    ____--     -                                                                -      -__ _-         9, 069. 40
Deductions on account of revocation of allotment-- ---                                                                  ---        __         1, 000. 00
                 Net amount to be accounted for------ ---------------                                                                          8, 069. 40
            RIVERS AND HARBORS-PUERTO RICO DISTRICT                                    1635
Gross amount expended---                ----                     $9, 559. 29
Less-
    Reimbursements collected ----------------- $3, 261. 59
    Receipts from sales-----------------------       2. 13
                                                                  3, 263. 72
                                                                                   $6, 295. 57

      Balance unexpended June 30, 1937---------------------------                   1, 773. 83
Outstanding liabilities June 30, 1937-------------------------------                   178. 27

     Balance available June 30, 1937_----------------------- -----                  1, 595. 56
Accounts receivable June 30, 1937---------------------------------                     160.41

       Unobligated balance available June 30, 1937------------ ------               1, 755. 97

               9. CONSTRUCTION OF ROADS AND BRIDGES

   Location.-Various localities on the island of Puerto Rico.
   Existing project.-No work has been authorized by Congress. The
work is authorized by the Public Works Administration and is being
executed by the Engineer Department at the request of the Bureau
of Insular Affairs. Funds are being disbursed by the Finance De-
partment of the Army. The work includes the construction of
municipal roads to serve as feeders to the insular road net, the con-
struction of bridges, principally on the south shore of the island,
and the construction of links in the insular road system. The roads
are to be constructed of water-bound Telford macadam, and the
bridges are to be of reinforced concrete.
   Local cooperation.-In determining the work to be undertaken,
the approval of the Governor of Puerto Rico is required, and all
work will be done in cooperation with the insular authorities.
   Operations and results during fiscal year.-Rechecked all estimates
on two contracts as to quantity of work performed and made a com-
plete field survey to establish certain facts before approving final
estimates for payment: The nonexpendable items of property and
equipment were assembled and placed in warehouse. The expendable
items of materials and supplies were turned over to the insular gov-
ernment for continuation and completion of the project.
   The costs for the year, all for new work, were $4,257.27, and the
total expenditures were $19,499.94, all from Public Works funds.
   Condition at end of fiscal year.--The project was completed in 1936.
There were constructed under the project 19 roads and 6 bridges,
which when completed were turned over to and accepted by the
Bureau of Insular Affairs.
   The total costs and expenditures under the existing project were
$985,000, all for new work and all from Public Works funds.
   Proposed operations.-There are no unexpended funds and no
work is proposed for the fiscal years 1938 and 1939.
                            Cost and financial summary

Cost of new work to June 30, 1937 (disbursed under military finance
  system) ----------------------------------------- ----------- $985, 000. 00
Cost of maintenance to June 30, 1937 --------.               -      .-         -

      Total cost of permanent work to June 30, 1937-------------- 985, 000. 00
Net total expenditures----------------------------------------    985, 000.00
Total amount appropriated to June 30, 1937---------------------- 985, 000. 00
1636                     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


      Fiscal year ending June 30                 1933             1934               1935            1936            1937

Cost of new work_---- ---- -------- --- . $124, 502. 11                          $708, 054. 81    $148, 185. 81      $4, 257. 27
Cost of m aintenonce.-     .-.  - - - - -.  - --.-                                - - - -        - - --.-...
Total expended-------------------            _---------         81, 915. 75       731, 337. 03     152, 247. 28      19, 499. 94
Allotted...............------   ---------.. --------------   1 000 000. 00 ---------------          15,000. 00


Balance unexpended July 1, 1936__________--____            ___     __ $19,499. 94
Gross amount expended _-----__   --    __    -__   -____ $19, 643. 24
Less reimbursements collected _________-
                                     -    -_____--            143. 30
                                                                                                                  19, 499. 94

                          10. RECLAMATION OF SWAMP AREAS, PUERTO RICO

   Location.-Swamp areas adjacent to San Juan Harbor and at
Ponce Playa and Salinas, P. R.
   Existing project.-No work has been authorized by Congress. Two
appropriations were made for the work, which is being executed by
the Engineer Department at the request of the Bureau of Insular
Affairs. Work under the first appropriation, designated as Federal
project no. 2, was authorized by the Public Works Administration
September 22, 1933, and the funds are being disbursed by the finance
department of the Army. Work under the second appropriation,
designated as Federal project no. 4, was authorized by the Public
Works Administration in March 1935, and the funds are being dis-
bursed by the Engineer Department. The work includes filling, by
the hydraulic method, of malarial swamp areas adjacent to San Juan
Harbor, the preparation of one of these areas for use as an airplane
landing field, and the reclamation, by the subsoil drainage method,
of malarial swamp areas at Ponce Playa, Salinas, and San Juan
Harbor.
   Local cooperation.-In determining the work to be undertaken, the
approval of the Governor of Puerto Rico is required. All work is
being done in cooperation with the insular authorities.
   Operations and results during fiscal year.--Subsoil drainage at San
Juan, P. R. (Santurce, Borda estate), commenced November 11, 1935,
in progress at the beginning of the fiscal year, was completed on July
15, 1936. Subsoil drainage at Salinas, P. R. (Jauca), commenced
December 1, 1935, in progress at the beginning of the fiscal year, was
completed July 3, 1936. The work was completed under the designa-
tion Federal project no. 4.
   The costs for the year were $5,114.91, all for new work, from Public
Works funds. The expenditures were $7,656.16, all from Public
Works funds.
   Condition at end of fiscal year.-All projects were completed.
   The costs of the existing project to the end of the fiscal year were
$600,000, all for new work, from Public Works funds. The total ex-
penditures were $599,978.81, all from Public Works funds.
   Proposed operations.-The unexpended balance in the amount of
$21.19 will be applied to accounts payable June 30, 1937. No work
is proposed during the fiscal years 1938 and 1939.
     SURVEYS               FOR NAVIGATION,                           FLOOD CONTROL, POWER, ETC.                                             1637

                                                     Cost and financial summary

Cost of new work to June 30, 1937-________---__--------                                                               ___        1$600, 000. 00
Cost of maintenance to June 30, 1937                                               -------------------------
                                                                                      ________--


     Total cost of permanent work to June 30, 1937_--                                                           - -         --     600,    000. 00
Minus accounts payable June 30, 1937_ _____    __--                                        ---------                                        21.19

            Net total expenditures______________________                                                           -              1599,    978. 81
Unexpended balance June 30, 1937____--------------------------                                                                              21. 19

            Total amount appropriated to June 30, 1937                                         ---------------                     600, 000. 00

    Fiscal year ending June 30                             1933             1934                  1935                 1936                1937


Cost of new work _____- _______ ____ __ ____ $149, 504. 23                                    $326, 640. 95 $118, 739. 91       $5, 114. 91
Cost of maintenance----  -------     -------------------                                        --- -----------        ------ ------

Total expended_-           __ ----             -.         -     -___
                                                        __________-_      143, 821. 03         329, 638. 08        118, 863. 54             7, 656. 16
Allotted.....----..--..........-------------        ----...-       ----   500, 000. 00 --------------             100, 000. 00


Balance unexpended July 1, 1936 -------                                                      -----------                             $7, 677.35
                       --
Gross amount expended_______                                      ____        __-----               _          $9,163.21
Less reimbursements collected---__--------- -----                                                       -      1, 507. 05
                                                                                                                                     7, 656. 16

      Balanee unexpended June 30, 1937 -------------------                                                                                  21.19
Outstanding liabilities June 30, 1937_____------------- -----                                                                               21. 19
1 $500,000 disbursed under Military Finance System.

Status of reports called for by river and harbor acts and committee resolutions

           Locality                      Authorization act                to Congress                Document No.                  Recommenda-
                                                                          to Congress                                                     tion

Aguadilla Harbor, P. R_               River and.Harbor Act,               Nov.                                  --
                                                                                   9, 1936 ................------.....             Unfavorable.
                                         Aug. 30, 1935.
Arecibo Harbor, P. R --                Rivers and Harbors July 7, 1937 Rivers and Harbors Favorable.
                                          Committee resolu-                              Committee, 43, 75th
                                          tion, Feb. 3, 1937.                            Cong., 1st sess.
Fajardo Harbor, Fa-                    River and              Harbor .
  jardo, P. R.                            Act, Aug. 26, 1937.
Guayanes Harbor, Ya-                   River and              Harbor Apr. 29, 1937 House, 243, 75th Cong.,    Do.
  bucoa, P. R.                            Act, Aug. 30, 1935.                            1st sess.
Guayanilla      Harbor,                River and              Harbor         __
  Guayanilla, P. R.                       Act, Aug. 26, 1937.
Jobos Harbor, Guay-                   -----..do-.............        --------------- ------------------------
                                                                                           .
  ama, P. R.
St. Thomas Harbor,                    River and      Harbor               Apr.     2, 1937      House, 200, 75th Cong.,               Do.
  Virgin Islands.                      Act, Aug. 30, 1935.                                        1st sess.
San Juan Harbor, P. R                 River   and Harbor                  July     7, 1937      Rivers and Harbors                    Do.
                                       Committee resolu-,                                        Committee, 42, 75th
                                       tion, Oct. 2, 1936.                                       Cong , 1st sess.



SURVEYS FOR NAVIGATION, FLOOD CONTROL, POWER,
               AND IRRIGATION

     Existing project.-The existing project provides for making inves-
tigations of those navigable streams and their tributaries whereon
power development appears feasible and practicable, with a view to
the formulation of general plans for the most effective improvement
of such streams for the purposes of navigation and the prosecution
of such improvement in combination with the most efficient develop-
ment of the potential water power, the control of floods, and the
needs of irrigation.
1638            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The River and Harbor Act of January 21, 1927, adopted the proj-
ect as laid down in House Document No. 308, Sixty-ninth Congress,
first session, and added the following streams to those listed in that
document: Red River, Yazoo River and tributaries, Pearl River,
Altamaha River and tributaries, tributaries of the Warrior, Coosa,
and Tombigbee Rivers. The Flood Control Act 'approved May 15,
1928, extended the scope of the investigation and surveys so as to
include tributaries of the Mississippi River system, subject to de-
structive floods, and laid down certain additional investigations on
these tributaries.
   The estimated cost of the work described in House Document No.
308 is $7,322,400. In addition, the act of May 15, 1928, authorized
the expenditure of $5,000,000 of flood-control funds for the surveys
of the tributaries of the Mississippi River.
   Further study or review of reports is authorized by section 6 of the
River and Harbor Act of August 30, 1935, reading as follows:
   That the surveys authorized pursuant to section 1 of the River and Harbor
Act of January 21, 1927, and House Document No. 308, Sixty-ninth Congress,
first session, shall be supplemented by such additional study or investigation as
the Chief of Engineers finds necessary to take into account important changes
in economic factors as they occur, and additional stream-flow records, or other
factual data.
   Op'erations and results during fiscal year.-Work on each of the
surveys involved was inaugurated in the spring of 1928. Valuable
cooperation has been received from other Federal agencies; from
State, county, and municipal engineers; from levee and drainage
districts, hydroelectric companies, railroads, universities, and other
local sources of information. Stream-gaging stations, where needed,
have been established mainly in cooperation with the United States
Geological Survey. At the close of the fiscal year 1937 surveys of
187 streams had been completed and reports thereon transmitted to
Congress, and reports on the remaining streams well advanced to
completion.
  Allotment of funds by streams to June 30, 1937, for prosecution of
the studies has been as follows:

                                                         Allotted from-
   Engineer district and name of                                                      Transmitted        Printed in document
              stream                                River and           Flood-con-    to Congress                no.
                                                   harbor funds         trol funds

Boston, Mass.:
    Androscoggin River 1_ _.----..                    $9, 751.23 --------                 Dec. 2, 1930   H. 646/71/3.
    Kennebec River 1 __                    -           9, 400. 54 --      __-_----_       Dec. 4, 1930   H. 658/71/3.
    Kennebunk River 1--                        -          343.93        ____-_-__-_- June 18,1930        H. 481/71/2.
    Machias River 1---                       _         1,372.47 -------------  ______     Dec. 2, 1930   H. 642/71/3.
    Merrimack River 1             .......             18, 599. 02--             -     ..... do- ...      H. 649/71/3.
    Penobscot River 1 ---                             11,001.61.----------------do ..                    H. 652/71/3.
    Presumpscot River 1.....              ..              412. 53 ..-....                    do -        H. 645/71/3.
    Saco River 1 ....-    - . .-....-                  5,626. 88    -------------         Dec. 4, 1930   H. 659/71/3.
    St. Croix River 1 ---            --                5, 550. 54 ------------- Dec. 2, 1930             H. 643/71/3.
    Salmon Falls River 1..---........                  2, 525. 27 -------------          June 19,1930    H. 483/71/2.
    Union River 1--_ _---_.......                      2, 950. 54 ------------ Dec. 2, 1930              H. 648/71/3.
Providence, R. I.:
    Connecticut River _----                          133, 410. 39   -------------     Feb. 12, 1936      H. 412/74/2.
    Connecticut River, Mass., N.                     240, 313. 88   .
     H., and Vt. (supplemental
     studies).
    Housatonic River_       -                         17, 100. 00 -----------         Feb.    9, 1932    H. 246/72/1.
   Pawcatuck River-----_                    -652. 20--          -       Nov. 26, 1929                    R.   & H. Com. 49/71/2.
   Pawtucket River_                          3, 400. 00-----             _-do     -                      R.   & H. Com. 50/71/2.
   Taunton River ..                          1,000. 00               --   __do .    .                    R.   & H. Com. 51/71/2.
   Thames River - ......         _.         17,399. 17 ,      -         Dec. 2, 1930                     H.   644/71/3.
  IA total of $200,000 additional allotted to projects in the Boston district.
      SURVEYS FOR NAVIGATION, FLOOD CONTROL, POWER, ETC.                                                                   1639

                                                        Allotted from-
    Engineer district and name of                                                       Transmitted        Printed in document
              stream                               River and        Flood-con-          to Congress                 no.
                                                  harbor funds      trol funds
                                          i   I                                    I           I
First New York, N. Y.:
    Ausable River___ _________ .                        $797. 06                        June 21, 1930 H.       488/71/2.
    Batten Kill_     -      -                         3, 599. 46                        Dec. 15, 1930 H.       685/71/3.
    Big Chazy River     _____                         6, 087. 38                        June 23, 1930 H.       490/71/2.
    Boquet River.___                                  2, 744.83                         Aug. 9, 1929 R.        & H. Com. 48/71/2.
    Hoosic River_____                                 4, 726. 32                        Dec. 15, 1930 H.       684/71/3.
    Hudson River and tributaries_..                   2, 877. 77                        Dec. 9,1931 H.         149/72/1.
    Kinderhook Creek .__________                      3, 981.37                         Dec. 2, 1930 H.        653/71/3.
    Lamoille River_ _______                          23, 312. 63                        Dec. 10, 1931 H.       145/72/1.
    Missisquoi River-- -                              5, 997. 91                        June 27, 1930 H.       496/71/2.
    Mohawk River        ___                           1, 462. 93                        Dec. 10, 1931 H.       158/72/1.
    Otter Creek____                                  10, 234. 02                       -_-  do.. ..-- H.       144/72/1.
    Poultney River _          --                      4, 557. 18                        June 19, 1930 H.       485/71/2.
    Rondout Creek and Wallkill                        5, 968. 10                        Dec. 23, 1930 H.       704/71/3.
      River.
    Saranac River ._                                 1, 115.38                         June 23, 1930      H. 492/71/2.
    Susquehanna River, N. Y., Pa.,                  40, 000. 00 -      ...
      and Md.
    Wappinger Creek____________...                   6, 203.96 ------------            Apr. 23, 1930      R. & H. Com. 55/71/2.
    Winooski River__ -                              36, 539.17 --------------          Feb. 26, 1931      H. 785/71/3.
Second New York, N. Y.: Raritan                      2, 565.10 -------------           Dec. 27,1929       R. & H. Com. 53/71/2.
  River.
Philadelphia, Pa.:
    Delaware River and tributaries-_                77, 228. 56                         Oct.    9, 1933   H.   179/73/2.
    Lehigh River      ______                        13, 552.08                          Feb.    9, 1932   H.   245/72/1.
   Mongaup River________                             2, 058. 38                         Dec.    4,1930    H.   660/71/3.
    Neshaminy Creek_ ___      ____                   1, 599. 61                        May     24,1930    H.   429/71/2.
    Neversink River .___                             3, 123.46                          Dec.    9, 1931   H.   147/72/1.
    Perkiomen Creek__ ______                         2, 407. 82                        June    19, 1930   H.   482/71/2.
    Shohola Creek_______                             1,875. 06                          Dec.   10, 1931   H.   155/72/1.
    Tohickon Creek_ ____________                        926. 85                        June    19, 1930   H.   486/71/2.
Baltimore,Md.: Susquehanna River.                  218, 810. 30
Washington, D. C.:
     Occoquan Creek __________-----
     Potomac River 2 ._____________         210, 903. 71                   Apr. 22, 1932                  H.   101/73/1.
     Pamunkey River --..........               9, 000. 00                  Jan.    9, 1930                R.   & H. Com. 54/71/2.
     Patuxent River 2.           2-            2, 900. 00                  -...-do -... -                 H.   463/71/2.
     Rappahannock River ________              30, 500.00                   Sept. 26,1933                  H.   186/73/2.
Norfolk, Va.:
     James River...- .- _...                 108, 080. 19                  Aug. 23, 1933                  H. 192/73/2.
     Meherrin River__________                   5, 131.84                  June 2, 1930                   H. 446/71/2.
     Roanoke-Staunton Rivers
Wilmington, N. C.:
                                   ----      180, 734. 01                   Nov. 16, 1934                 H. 65/74/1.
     Cape Fear River.____                     58, 901.43                   Sept. 27, 1933                 H. 193/73/2.
     Neuse River.....__.....______.....       32, 278. 57                  June 1,1932                    H. 500/72/2.
     Tar River- .        _                     4, 520. 00                  Dec. 16, 1931                  H. 187/72/1.
Charleston, S. C.:
     Santee River___________                109, 497. 68                   Mar. 3, 1933                   H. 96/73/1.
     Yadkin-Pee Dee Rivers........          115, 805. 45                   May 16, 1933                   H. 68/73/1.
Savannah, Ga.:
     Altamaha River and tributaries_        140, 902. 18                   Nov. 16, 1934                  H. 68/74/1.
     St. Marys River___                           793. 23
     Satilla River___                          5, 842. 55                  Dec. 27, 1929                  R. & H. Com. 52/71/2.
     Savannah River_...___-          .      124,140. 00                    Nov. 9, 1934                   H. 64/74/1.
Jacksonville, Fla.:
     Suwannee River_____                       9, 001.22
     Withlacoochee Rivet .........            15, 476. 15
Montgomery, Ala.:
     Apalachicola River..--...-.....-       246, 631.44
     Mobile River, including Coosa          258, 305. 69                   Nov.   16, 1934                H. 66/74/1.
       River and tributaries.
Mobile, Ala.:
     Pearl River___._____.___...        __    18, 590. 86 -         --     June 2, 1930                   H. 445/71/2.
     Tombigbee River and tribu-               67, 950. 00
       taries.                                                             Oct. 27, 1932                  H. 56/73/1.
     Warrior River and tributaries ._
New Orleans, La.:
                                            185, 877. 71           -------------
     Amite River_. .......                     1,942. 31                   June 18, 1930                  H. 480/71/2.
     Bayou Nezpique...............            17, 798. 95
                                                            -          =
     Bayou Teche___... ... ______.__          19, 670. 60                  Dec. 9, 1932                   H. 75/73/1.
     Calcasieu River .. _.............
     Chefuncte River_..___________
                                              26, 994. 26
                                                  876. 28          -------------
                                                                           June 19, 1930                  H.   487/71/2.
     Tangipahoa River_......__._....              932. 82
     Tickfaw River_____________
Galveston, Tex.: Guadalupe River._
                                                  817.88
                                             65, 578. 23
                                                                   -------------
                                                                          -_-. do ..- _-_-
                                                                           Aug. 9, 1929
                                                                   --------------
                                                                           July 13, 1935
                                                                                                          H.
                                                                                                          H.
                                                                                                          H.
                                                                                                               484/71/2.
                                                                                                               110/71/1.
                                                                                                               238/74/1.
Vicksburg, Miss.:
     Big Black River.._____.__                                $51, 872.75 Dec. 9, 1932                    H. 72/73/1.
     Mississippi River, comprehen- --------------.--------------           July 29,1935                   H. 259/74/1.
       sive reservoir report.
  2 A total of $14,350 additional allotted to Potomac, Patuxent, and Rappahannock                         Rivers.
1640               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                               Allotted from-
     Engineer district and name of                                                                  Transmitted        Printed in document
                stream                                   River and            Flood-con-            to Congress                 no.
                                                        harbor funds          trol funds


Vicksburg, Miss-Continued.
     Ouachita River________                               $13, 000. 00           $24, 000. 00       Dec. 7,1933       H. 196/73/2.
    Red River_____ _________-___-_                         43, 000. 00           702, 742. 23       Dec. 2,1935       H. 378/74/2.
    Yazoo River and tributaries----                        64, 000. 00           429, 239. 52       Nov. 17, 1933     H. 198/73/2.
Memphis, Tenn.:
    Arkansas River and tributaries__                       30, 344. 04           523, 085. 50       July 29,1935      H. 308/74/1.
    Fourche La Fave River.----                     -           820.77              7, 000. 00      . ..---
                                                                                                        do.......         Do.
    Grand River_---                                        67,060.33              27, 000. 00      __.._do.._....         Do.
    Hickman, Ky. (flood control) - -_                                                               Jan. 28,1931      H. 729/71/3.
    Illinois River            -------                        3, 865. 51               7, 000. 00    July 29, 1935     H. 308/74/1.
    Mayfield Creek_____________--.                                                    1,000.00      Dec. 10, 1931     H. 156/72/1.
    Mississippi River below Cape                                                                    Dec. 16, 1931     H. 188/72/1.
       Girardeau, Mo.
    Petit Jean River_----                                       758.51                6,000.00      July 29,1935      H. 308/74/1.
    Poteau River_______                                         677.81                5, 000.00     - -.do..-----         Do.
    St. Francis River___________
    St. Francis River (backwater                                                                    Aug. 10, 1929     H. 159/71/2.
                                                             5,001.21             47, 000. 00       May 24, 1930      H. 430/71/2.
       area).
    White River -.                                         20, 471. 82          245, 955. 93        Mar. 30, 1932     H. 102/73/1.
St. Louis, Mo.:
    Meramec River_____-__- ___                              7, 500.00            --
                                                                                ----------- Dec. 15,1930              H. 686/71/3.
    Mississippi River___---                                23, 000. 00          163,764.79----..-------_
Rock Island, Ill.:
    Cuivre River__..           .--. .......                                                       Oct. 21, 1935
    Des Moines River--____                                   5, 000. 00               1,800. 00  Dec. 16, 1930        H. 682/71/3.
    Fabius River_ ...-------------.                                                              Aug. 6, 1935         H. 272/74/1.
    Iowa River ... ____-.--       ....                   -- -5,000.00
                                                             5, 000. 00                          Dec. 13, 1929        H. 134/71/2.
    Maquoketa River...............                                                               June 26, 1933
    Mississippi River.......----             ...-            4, 500.00             44, 511.34  -- -- - - - - -
    Rock River-...-    ---------                                                     3,000.00 June 26,1933
                                                                          ..............
    Salt River . ____..                     . . . .
                                      __--_..                                                    Jan. 2, 1936
    Skunk River___. ___--- __-__                                                     2, 500.00 Dec. 14,1931           H. 170/72/1.
    Turkey River.._.- ____.--                     ___                     -------------- Mar. 3,1933                  H. 98/73/1.
    Wapsipinicon River. ...........                                       ..............        June 20, 1933
    Wyaconda River................                                        .............          Aug. 6, 1935         H. 273/74/1.
St. Paul, Minn.:
    Chippewa River_....----                                11, 594. 91               3, 628.12     Dec. 14, 1931      H. 171/72/1.
    Minnesota River_.......___.___                          2, 011.69                7,899.84      June 10,1935       H. 230/74/1.
    Mississippi River:
         Above Coon Rapids--------                                                                  May 25, 1933      H. 66/73/1.
         Below Coon Rapids........                         41, 007. 56            28, 450. 22
    St. Croix River__----- __..         .      ..           9, 519.17              4, 595. 84      June 9, 1930       H. 462/71/2.
    Wisconsin River_----------                              4, 296. 67             5, 976. 35      Jan. 17,1930       H. 259/71/2.
Chicago, Ill.:
    Fox River_.....                __                       1,809. 36                  273. 09      Apr.   26, 1930   H.   410/71/2.
    Illinois River. __________                             10, 237. 22              9, 351. 33      Dec.   16,1931    H.   182/72/1.
    Kankakee River._____                                   11, 261. 20              6, 200. 00      Feb.   26, 1931   H.   784/71/3.
    Sangamon River____                                     19, 536. 03              7, 375. 58      Dec.   16; 1931   H.   186/72/1.
Kansas City,Mo.:
    Bad River .....................                         2, 500. 00            10, 500.00
    White River__                                           3, 500. 00                             }June 26, 1933     H. 189/73/2.
                                                                                  16, 000. 00
    Big Sioux River_____                                    4,000.00               8,0 .00
    Little Sioux River_                --   -               3, 500. 00             4, 500. 00      Dec. 16,1931       H. 189/72/1.
    Cannon Ball River-_ ...                 ____.           2, 000.00              9, 500.00
    Grand River, S. Dak________                             2, 000.00              9, 500. 00
    Grand River, S. Dak. (supple-                           3, 000. 00     ...........              Oct.   27,1932    H. 76/73/1.
       mental studies).
    Moreau River ..____...........                         2, 500. 00            9, 500.00
    Cheyenne River___-                      __             9,000. 00            55, 500. 00         Dec. 16, 1931     H. 190/72/1.
    Gallatin River.____                                    2,000. 00             5, 000. 00
    Jefferson River____________                            2, 500. 00            7,000.00                             H. 192/72/1.
    Madison River ....                                     4, 500. 00            5, 000. 00         ...do..-----
    Gasconade River___---                                  4, 500. 00            7, 000.00             do .---- _ H. 192/72/1.
    Grand River, Mo____________                           17, 000. 00           24, 000. 00        Jan. 26, 1932      H.   236/72/1.
    James River_---                                        9, 000. 00           33, 400. 00        Mar. 24, 1933      H.   83/73/1.
    Kansas River__________                                39, 143. 88          143, 000. 00        Dec. 7, 1933       H.   195/73/2.
    Little Missouri River .. --..-                         2, 500. 00           14, 000. 00        May 10, 1933       H.   64/73/1.
    Marias River_ -........                                4, 500. 00            5, 500. 00        Dec. 16,1931       H.   191/72/1.
    Milk River_--                                          3, 000. 00           35, 500. 00        Oct. 27, 1932      H.   88/73/1.
    Missouri River_---- _              ----------         38, 919. 58          395, 872. 02        Oct.  3, 1933      H.   238/73/2.
    Missouri River diversion, Heart                        5, 000. 00     .............
       River,   N. Dak.                  (supple-
      mental studies).
    Musselshell River________                              3, 000. 00            7, 100. 00        Dec.    10,1931    H.   146/72/1.
    Niobrara River _                 -                     4, 500. 00           19, 500. 00        Oct.    27, 1932   H.   90/73/1.
    Osage River ........-.-......                         11, 000. 00           56, 500. 00        Dec.    23, 1932   H.   91/73/1.
    Platte River _                                        20, 000. 00          227, 805. 50        Nov.     3, 1933   H.   197/73/2.
    Yellowstone River _                   - --            14, 000. 00          193,000. 00         Feb.    10,1934    H.   256/73/2.
Nashville,     Tenn.: Cumberland                         141, 000. 00          204, 999. 07        Apr.    28, 1933   H.   38/73/1.
River.
    SURVEYS FOR NAVIGATION, FLOOD CONTROL, POWER, ETC.                                                                                        1641

                                                    Allotted from-
   Engineer district and name of                                                                                   Transmitted   Printed in document
              stream
                                              River and                    Flood-con-                              to Congress            no.
                                             harbor funds                  trol funds
                                                             I                                                   .1i
Chattanooga,     Tenn.:             Tennessee     $313, 315. 00          $2, 500. 00 1 Mar. 24, 1930 1 H. 328/71/2.
  River.
Pittsburgh, Pa.:
    Allegheny River 3_____________                   8, 500.00           65, 685. 60
    Beaver River 3__________________                 2,000.00            39, 818. 57
    Monongahela River 3__________                   15, 900. 00          52, 883. 37
    Ohio River 3_______________                      2, 600.00           54, 031.72 Aug. 14, 1935 H. 306/74/1.
Huntington, W. Va.:
    Big Sandy River____________                      5, 268. 94          12, 065. 61 June 29, 1935       H. 245/74/1.
    Guyandot River_________                          3, 621.70                  442. 13 Dec. 9, 1931     H. 150/72/1.
    Hocking River_________                                                 4, 752.09 Feb. 11, 1933 H. 82/73/1.
    Kanawha River____________                       46, 678. 62          30, 819. 21 Jan. 29,1935 H. 91/74/1.
    Little Kanawha River .........                   6, 671.68             6,459.48 Feb. 2,1931 H. 732/71/3.
     Ohio River____....                                                  14, 947. 69 Aug. 14, 1935 H. 306/74/1.
    Twelve Pole Creek -___                                                 3, 940. 52 June 20, 1933
Zanesville, Ohio: Muskingum River_                    7, 702. 29         17, 511.99
Cincinnati, Ohio:
     Ohio River (Ohio River Divi-                                          2, 483. 31 Aug. 14,1935       H. 306/74/1.
       sion).
    Kentucky River___________                       24, 400.00         104, 889. 75 Oct. 27,1932 H. 85/73/1.
    Licking River ____                              26, 900.00           13, 956. 93 June 30, 1932 H. 86/73/1.
    Little Miami River____                                                 9,982. 58 June 18,1935
     Miami River______                              11, 700.00             8, 110. 52 Dec. 16, 1930      H. 681/71/3.
     Ohio River___                                       500.00          10, 848. 49 Aug. 14, 1935 H. 306/74/1.
     Scioto River                       -_____________
                                                 ..----------- 29, 025. 96 ...............
Louisville, Ky.:
     Green, Barren, and Rough Riv-                  57, 000.00           71, 500. 00 Oct. 27, 1932 H. 81/73/1.
       ers.
     Ohio River_____                                                   244, 594.02 Aug. 14, 1935         H. 306/74/1.
    Salt River ._______                               1, 200. 00                          June 12,1930   H. 477/71/2.
      ;radewater River_______                        2,200.00                            June 19 1930 H. 479/71/2.
    Wabash'River____                       ____     33,60. 00          305, 602.87 Feb. 17,1 33          H. 100/73/1.
Duluth, Minn.:
    Amnicon River__........                           4, 000. 00                          Dec. 10, 1931 H. 164/72/1.
     Bad River.___._______.__._.....                 8, 057. 87                           Dec. 9, 1932   H. 71/73/1.
     Baptism River__________                          2, 600. 00
    Manitou River___
     Beaver Bay River...............
                                    __________        2, 480.00
                                                      2,480. 00
                                                                 -------------            Feb. 15,1932 H. 250/72/1.
                                                                                          Jan. 14,1932   H. 226/72/1.
     Big Fork River________....____                 14, 200. 00        .............      Oct. 27,1932 H. 73/73/1.
     Brule River, Minn_.............                 4, 648.55                            Dec. 9,1932    H. 74/73/1.
     Brule River, Wis_......._                        3, 860. 00 ..............           Jan. 14,1932   H. 227/72/1.
     Carp River_...... _.__    ....       __ ..       2, 500. 00 .............
                                                                 --------------
                                                                                          Dec. 9, 1931   H. 142/72/1.
     Cascade River_                                   2, 280.00    _ _ _ _ _.......
                                                                                          Oct. 27, 1952  H. 77/73/1.
     Devil Track River .............
    Gooseberry River__...
                                                      2, 280. 00
                                                      1,980. 00
                                                                 }-----------
                                                                   .............
                                                                       .............
                                                                                          May 17, 1932 r. 79/73/1.
                                                                                          Jan. 26, 1932  H. 238/72/1.
    Kawishiwi River................                  7, 379.99     ............        - May 4, 1933     H. 65/73/1.
     Little Fork River.............__               11, 900. 00    .. ..........          Oct. 27, 1932 H. 87/73/1.
    Montreal River.................                  4, 900. 00   .............              _do ______  H. 89/73/1.
     Pigeon River.....                               8, 521. 16    ... _ _....... Mar. 3,1933 H. 92/73/1.
                                              _
     Poplar River ......                             3,180.00      .............
    Temperance River.---.......                      2,780. 00                            Apr. 30, 1932 H. 93/73/1.
    Rainy River...............             ....     38, 399. 55  ..........                        ..


    St. Louis River ..............                  14, 244.63   .....
                                                                                          Jan. 14, 1933 H. 95/73/1.
                                                                                    ........

    Sturgeon River..................                10, 165.83 ..............             Dec. 9, 1932 H. 97/73/1.
    Vermilion River....... ........
Milwaukee, Wis.:
     Grand River, Mich.............
     Kalamazoo River...                _
                                                     8,188. 81
                                                    32, 447. 27
                                                    20, 042. 36
                                                                 I_--------_
                                                                 .


                                                                 .....



                                                                 .....
                                                                       .
                                                                                          -....
                                                                                        - -



                                                                                          Oct. 27, 1932
                                                                                    .......



                                                                                    .......
                                                                                           -do ........ H. 99/73/1.
                                                                                                   -    -.   .



                                                                                                         H. 80/73/1.
                                                                                          Jan. 14,1932 H. 224/72/1.
    Manistee River__                                20, 766. 53 ..............            Dec. 9, 1931   H. 159/72/1.
    Manistique River...............                  8, 176. 10  . .                      Dec. 19, 1929 R. & H. Com. 56/71/2.
                                                                                         - -       - -.      .

    Menominee River...........___                   27, 015. 35  .     .                  Dec. 9, 1931
                                                                                         - -       - -.  H. 141/72/1.
                                                                                                             .

    Muskegon River_ __..._.                   __    30, 175. 10  __.                      Dec. 10, 1931
                                                                                               - - -__   H. 143/72/1.
     Oconto River_.................                  9, 960. 39  - -        -   -      - -June 23, 1930
                                                                                               -        -H. 489/71/2.
    Peshtigo River_................_                  1,978. 50                           _-- do....-__ H. 491/71/2.
    St. Joseph River___                             34, 263. 91                           May 23, 1932 H. 94/73/1.
    W olf River ....................                32, 174. 49                           Mar. 15, 1932 H. 276/72/1.
San Francisco, Calif.:
    Eel River....                                   18, 995. 00                           Aug. 23, 1.933 H. 194/73/2.
    Klamath River_..                                 9, 381.18                            Oct. 16, 1933 H. 181/73/2.
    Mad River___ ........._                __       13, 000. 00                           Aug. 23,1933 H. 188/73/2.
Sacramento, Calif.:                                              ------ - ---
    Kern River_......                      ..       13, 760. 00
    Sacramento River_....._......__                115, 382. 92                          JFeb. 27,19314 H. 791/71/3.
    San Joaquin River..________                     67, 168. 27                           June 27,1933 5 H. 191/73/2.
    Sacramento-San Joaquin-Kern                    126, 000. 00
       Rivers (salt-water barrier).
  3 A total of $200,000 additional river and harbor funds allotted to streams in the Pittsburgh district.
  4Partial report.
  d Final report.
1642              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                            Allotted from-
     Engineer district and name of                                                            Transmitted            Printed in document
                stream                               River and            Flood-con-          to Congress                     no.
                                                    harbor funds          trol funds


Portland, Oreg.:
    Columbia (lower) River-....-__       . $256, 132. 49 -----------.               Mar.              29, 1932      H.   103/73/1.
    Cowlitz River                             16, 460. 20                           Dec.              11,1930       H.   166/71/3.
    John Day River ____.-___-____             57, 699. 93-____-            ____-    May               24, 1932      H.   84/73/1.
    Lewis River .------------------- 11, 811. 5               ......------------__ Dec.               16, 1930      H.   680/71/3.
    Snake River_______      ___      ___      51, 302. 11 --        -_____--Dec.                      16, 1933      H.   190/73/2.
    Willamette River- ..... _____..          116, 182.43 ___-___                    Feb.              27, 1932      H.   263/72/1.
Seattle, Wash.:
    Chehalis River__-----
                    .....                _     9, 520. 96----------               - Dec.               9,   1931    H. 148/72/1.
    Columbia (upper) River..--------         392, 414. 53 -___-                     Mar.              29,   1932    H. 103/73/1.
    Puyallup River __.........__.             16, 049. 68               -------------
                                                                                    Dec.              10,   1931    H. 153/72/1.
    Skagit River- _ __-----     --------      79, 159. 65-..                        Sept.             14,   1933    H. 187/73/2.
    Snohomish River_____---_                - 64,700. 19-..                         Feb.              15,   1934    H. 258/73/2.
    Stilaguamish River-......    __        - 20, 641. 76 __               _         Dec.               4,   1930    IH. 657/71/3.
            ----------
        Total....                   ---------- 6, 622, 712. 37           4, 980, 251. 43



PRELIMINARY EXAMINATIONS AND SURVEYS FOR
  FLOOD CONTROL, AUTHORIZED BY THE FLOOD CON-
  TROL ACTS APPROVED JUNE 22, 1936, AND AUGUST
28, 1937
  Section 6 of the Flood Control Act approved June 22, 1936, and
section 5 of the Flood Control Act approved August 28, 1937, au-
thorizes and directs the Secretary of War to cause preliminary
examinations and surveys to be made of the following localities with
a view to the control of floods:

                                  Locality                                          Date of act           Transmitted
                                                                                                          to Congress         Document No.
                                                                                                                                 ument No.


Boston, Mass.:
    Androscoggin River, Maine-_-....-.......-......                --                    June 22, 1936
    Kennebec River, Maine ..--                     ... -----------
                                                           ...---                         -._do_ ...-             - -__      -,
    Merrimack River, Mass. and N. H-. --                                 ....-.--_ --                    .............
                                                                                              do.......-..
    Penobscot River, Maine........---------------------....---..do....
    Saco River, Maine ...----------------------....                      -----            --..do ...--
Providence, R. I.:
    Blackstone River, Mass. and R. I_____.................---....                        -- do-....____ ..------..,
    Connecticut and Chicopee Rivers __________----       ...                 .... Aug. 28,1937 .
    Connecticut River, Mass., N.               H.,
                                                 Vt., and Conn ..... June 22,1936 .......-                           , ...
    Moshassuk River and tributaries, Rhode Island------..... .do .... ...                                           ____...
    Passumpsic River, Vt ....                                                          ---. do_ ..
                                                              .........--------------------------.                     ..- _
    Pawtuxet River, R. I__-......_____.......____                     ........ Aug. 28,1937 -
    Seekonk River, R. I____...........__...___...........__                              June 22,1936
    West River, Vt., between Weston and Brattleboro ...--..                                 _ do        ____________
     Woonasquatucket River and tributaries, Rhode .....do -                                           _,------------
       Island.
First New York, N. Y :
    Battenkill, N. Y __.--------..---------------------- Aug. 28, 1937
    Beaverkill Creek, N. Y                    -_________Jne_2__----                     June 22, 1936 -
    Beaverkill River, Sullivan County, N. Y- ..                            - ---        ---- do ..
    Birch Creek, N. Y          ---------------------------                            ----- do-
    Bushnelville Creek, N. Y_ ____.    --            -________-.__--- -----..        -do..__-_
    Catskill Creek, Greene County, N. Y____________ .... do                                              I_
    Delaware River, East Branch, Sullivan County, N. Y ..-_do
    Delaware River, N. Y. -----------------------------                                       do
                                                                                                        --............
                                                                                                  .______..
    Dog River, Vt.-----------------------------------do---
    Esopus Creek, N. Y               ...                  .......------------------------------
                                                                                              do ...........----------
    Ilion Steel Creek, N. Y _------______________                         ___-      _. Aug. 28, 1937    -
    Lackawack River, Sullivan County, N. Y_-- --                                    -__June 22, 1936
    Mettawee River, N. Y_               _____.- ____... _______...          ...         Aug. 28,1937
    Neversink Creek, Ulster County, N. Y_...___.__ .. June 22, 1936
    Neversink River, Sullivan County, N. Y-___-----                                  _ _-do__
     New Creek, N. Y-------------.....------          -... do ..
     Rondout Creek, Ulster County, N. Y- ...........
                                             ---          ...do ..
     Sawkill Creek, Ulster County, N. Y ............
                                                 -      .....do_
     Schoharie Creek, Greene County, N. Y.....      - , _- do...
PRELIMINARY EXAMINATIONS AND SURVEYS, FLOOD CONTROL                                                                                            1643

                                    Locality                                            Date of act            TranCosmitte              DocumentNo.


First New York, N. Y.-Continued.
    Schoharie Creek and tributaries, Schoharie County, June 22, 1936 I..............
       N. Y.
    Warner Bushkill Creek, N. Y ...          __            .________.......      .....  do-....---
    Willowemoc River, Sullivan County, N. Y _-                 .. ...--....             do ...
    Winooski River, Vt_........      , ..            ................do .....    .....
    Woodland Creek, N. Y----                   .........
                                                ------
Secoid New York, N. Y.: Passaic River, N. J.
Philadelphia, Pa.:
    Delaware River .----------..............------------------- Aug. 28, 1937
    Delaware River, Tinicum Township, Pa......_....... June 22, 1936                                           Apr.      29,      1937


Baltimore, Md.: Marshy Hope Creek, Md_ ...                 _......... .....             do .
Washington, D. C.:                                                                                        .- - - - - - -
    North branch     of   Potomac    River   and  its  tributaries         in     Aug.     28,1937
       the vicinity of Keyser, W. Va.
    Patuxent River and its tributaries, Maryland ....... June 22,1936
    Potomac River and tributaries ......    __            .__--------- -          .. do_
Norfolk, Va.: James River, Va_____ __..__ ...............                        - ...  do -------
Wilmington, N. C.:
    C o ntent ne a C re e k , N . C     _
                                      .....
                                         _..                              ...       ..  do ....
    Drum Inlet,     N. C .-------             . . . ..----------------------     .---do       .----
Charleston, S. C.:
    Cooper River, S. C ._--.---.....            -----------------....             -     do
    Edisto River and tributaries, South Carolina ...               _....             -- do - - -
    Pee Dee River (Great and Little and Lynches River, ...-----do .-
       S. C.
    Santee, Congaree, and Wateree Rivers, S. C_ ........ .. do .
    Waccamaw River, S. C---.........--------------------                           .. do .---                  .   ..-------------
Savannah, Ga.:
    Altamaha River, Ga ... __--------------------...................-----        --.. do .---------------.
    Ogeechee River, Ga ------------------------------                            ... do ....... ......
    Savannah River, Ga .------------------------------                            -.. do....                       ...
Jack ,vilLe, .'la.;
    Broward County, Fla., Intracoastal Waterway .....do ...... , --..---.....
       throughout.
    Estero River, Imperial River, Corkscrew River (Horse Aug. 28, 1937 ...---.........
       Creek), Gordon River, Rock Creek, Hendry Creek,
       Mulock Creek, and Six Mile Cypress Slough, all in
       Florida.
    Hillsboro River, Fla ... _....................-.----                         June 22,1936 ...............
    Kissimmee River Valley and its tributaries, Florida .-. Aug. 28, 1937 -- ---
    Withlacoochee River, Fla_--___--.-----------------                           June 22,1936 -
Mobile, Ala.:
    Coosa River and tributaries, Georgia and Alabama ....--                              -do_         ---             -

    Pearl River, Miss ...-- .................... _                                      do ....----------.........
First New Orleans, La.: Mermentau River, La.........-- ...- do .....                                - Sept. 23,1937
Galveston, Tex.:
    Buffalo Bayou, Tex ..             . .          .. ..--------------------------  .       ----
                                                                                              -do       ---- -- -----
    Brazos River and its tributaries, Texas ..............                       Aug. 28,1937 -------- -----
    Colorado River (lower), Tex ...---......-----                     ....----   June 22,1936 --------------
    Colorado River, Tex., above county line between Coke                            u. 2do.1
       and Runnels Counties.
    Leon River, Tex -....-------           ---------------------- ... do ... .
    Neches River and tributaries, Texas-_---------                                ... do_
                                                                                  .. do ..              -------------
    Nleems River and tributaries Texas_
    Sabine River, Tex-------                  .     ..------------------        .....   do .... ----- -------
    Sai 3cistoa Rivr; and its trilb~aries,in gontg-an. Aug. 28,1937
       ery, Walker, San Jacinto, Grimes, Wailer, Lib-
      erty, and Harris Counties, Tex.
    Trinity River, Tex- _______-------------------------                         June 22, 1936 ...............
Vicksburg, Miss.:
    B ig B lack R iver, M iss . .__ . . . . . . . ..---------------- _           ....   do.....
    Boeuf River, Catahoula, Franklin, Caldwell, Rich- Aug. 28,1937
      land, West Carroll, and Morehouse Parishes, La.
    Caddo Lake Dam and Jefferson-Shreveport Water- June 22,1936
      way, La. and Tex.                                                                                   --     - -   - -   --    -


    Dugdemonia Bayou, La                                                  .. Aug. 28,1937 i-------------
    Eagle Town Reservoir, Okla                         __                        June 22,1936
    Little Missouri River, Ark_ ________________________                            ..do .
    Macon Bayou, Franklin, Madison, Richland, East Aug. 28,1937
       Carroll, and West Carroll Parishes,       La.
    Ouachita River and tributaries, Louisiana ......... ....---                         do ...../---------------
    Quiver River,Miss..................-----------------------                    ... do
    Red River, Ark ....----------------------------- June 22, 1936 /---------------
    Saline R iver, Ark, _.. .          .__              .___________._______ Aug. 28,1937
    Sulphur River, Ark--.................................                         .._do      - --
         Do -------------                                                        June 22, 1936
                                                                          ..-------------------------------
    Su lp h ur River, Tex_...         . ..
                                  .._____.__                 .___
                                                              ..........
                                                              __                    ...do .--
    Sunflower River, Miss ....................-....---                           Aug. 28,1937
Memphis, Tenn.:
    Bayou Meto Basin, a tributary of the Arkansas River Aug. 28, 1937 ...............
      in the State of Arkansas.
1644              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                Locality                                          Date of act           Transmitte
                                                                                                        to Congress                            Document
                                                                                                                                               Document No
                                                                                                                                                        No.

Memphis, Tenn.--Continued.
    Memphis, Tenn., with a view to submitting compre-                           Aug. 28.1937
      hensive plans for flood protection.
    Mississippi River and tributaries in Memphis and                            ....do    . ....    .... .... ....
       Shelby County, Tenn.
Little Rock, Ark.:
    Apishapa River, Colo------ __             -                                 June 22, 1936
    Arkansas River and Fourche Bayou, vicinity of Little                        June 22, 1936           -
       Rock and North Little Rock, Ark.
    Arkansas River in Sequoyah and Haskell Counties,                            Aug. 28,1937 ----                      -       -- -        -
       Okla.
    Arkansas River, Okla., levees at Tulsa and West Tulsa-                        June 22,1936      -------- - --
    Beaver River, Okla -...                                                       Aug. 28, 1937     ---------- - -
    Big Mulberry Creek, Ark_             -                                        June 22, 1936
    Big Piney Creek in Pope and Johnson Counties, Ark--                           Aug. 28,1937      -------- - - -
    Braman Reservoir, Okla--__                                                                      ---------------
                                                                                  June 22,1936
    Chikaskia River, Okla., levees south of Antwine___                                              ---------------
                                                                                      - -do -
                                                                                    _---
    Cimarron River, Okla. and Kans_                                               Aug. 28,1937      ---- - - - - -
    Cimarron River (dry) Union County, N. Mex--                           -       June 22, 1936     ------------ -
    Cossatot River, Ark                                                           ---- do -----
    Cow Creek, Kans ..... ..                                                                         --------------
                                                                                   __-do .-----
    Cuchara River, Colo.................                                                            ---- - - - - -
                                                       ____-___-.. .            ----- d o .....
    Eufaula Reservoir, Okla                 -       --                          ---.   do ---       --------------
    Fort Gibson Reservoir ....                     __            __                .do-.-.
    Fountaine Que Bouille (Fountain) River and its trib-                        Aug. 28,1937
       utaries, Colorado.
    Fourche La Fave River, in Perry, Yell, and Scott                            . -. d o -.... ..............
       Counties, Ark.
    Fourche La Fave River in Scott County, Ark., at
       "The Narrows".
    Grind (Neosho) River and its tributaries, Oklahoma,
       Kansas, Missouri, and Arkansas.
    Grand (Neosho) River, Morris County, Kans.....__                             June 22,1936 --------------'-
    Huerfano River. Colo-__-.----          _ ___---       -          ..--         ..-do         ------- '-"-
    Illinois Bayou, Pope County, Ark _-_...-                    .-...-           Aug. 28,1937 ---------------
    Kenton Reservoir, Cimarron River, Okla .........                    __       June 22,1936
    Little River, Ark__   ...       ___............
                                _____                       ..........          - - - _do__...._---------------
    Mannford Reservoir, Okla__.........._______........                               do----
                                                                                ---------------------
    Markham Ferry Reservoir, Okla --.. _-____....                                ..-do ..           ---------------



    North Canadian River, Okla. and Tex .............                           Aug. 28,1937            --.------------



                                      _
    Oolagah Reservoir, Okla ................    __     _____                    June 22, 1936
    Palarm Creek, a tributary of the Arkansas River in                          Aug. 28, 1937           -   ---            -   -   -   -

    Faulkner and Pulaski Counties, Ark.                                                                     -------------

    Pease River and tributaries, Texas__ .                               .__.    June 22, 1936
    Pensacola Reservoir, Okla                                                      _, _do ......
    Petit Jean River, Ark ... _....         _. .        __........              ...-----do ...      -------------

                                    ...
    Point Remove Creek, Ark _..______                                            _.. do .-----
    Poteau River, Ark.....________________                                       .- ...do ......
                                                                                 Aug. 28, 1937
    Purgatoire (Picket Wire) River, Colo--_-------                               June 22, 1936
    Sans Bois Creek in Haskell and Latimer Counties,                             Aug. 28, 1937
       Okla.
    South Canadian River, Okla_____......__...._ _ ___ ..                         ..       -----
                                                                                             . do.....
                                                                                                    ---------------



    Tenkiller Ferry Reservoir on Illinois River, Okla ...                                June 22, 1936  -----------

    Verdigris River, Kans____. _____________________                                           do__
                                                                                              .----
    Walnut Bayou in Little River County, Ark .......                                     Aug. 28, 1937
                                                                                                    ---------------

    Washita River, Okla .....................                                      _    --. do .......
                                                                                                            -----------
    Wister Reservoir, Okla___                ___        ___ ._._.__ ._ June 22, 1936
Rock Island, Ill.:
    Bureau Creek and tributaries, Illinois .............                        _.       Aug. 28,1937
    Cedar River, Iowa___ _______                           ___                          ..... d o .......
                                                                                                    ---------------

    Fabius (North) River, Mo________                                                     June 22,1936
    Fabius (South) R iver in northeast Missouri ..........                               Aug. 28,1937 ---------------
    Galen River (Fever River) in Illinois and Wisconsin_ Aug. 28, 1937 ---------------
    Iowa River, Iowa                 ...._______.. __ ____.
                                 ___..                                               __     __do._
    Salt River, Mo_-_-       ---    _ ----                                               June 22, 1936
    Turkey River, Iowa__                                                                  ._do_......             --    -
                                                                                                                       --      ----        -

    Wyaconda River in Clark and Lewis Counties, Mo___ -. .do ......
St. Paul, Minn.:
    Cannon River, M inn__                      .-.- .........----.-                      June 22. 1936
    Crow River, Minn__________________                                          -----
                                                                                ___            do .......
    Gilmore Creek, Winona County, Minn.........._____                                    Aug. 28, 1937
    Kickapoo River, Wis____                 .____.. __.                          .________-- do .-------
    Minnesota River, Minn -_ -                  .-      -_          ----                 June 22,1936
    Root River, Fillmore, Mower, Olmsted, Winona, and                                      .. do_..
       Houston Counties, Minn.
    Roseau River, Minn_                  ...-------------------------                    June 22, 1936
    Rum River, Minn_ _-------------------------.                                           ..- do_
    St. Croix River, Minn. and Wis._..                        .____              .___
    Souris River, N. Dak____ ___                      .........................              .do
                                                                                            ..
                                                                                            ---do ----    -
    Zumbro River and the Whitewater River in south- Aug. 28, 1937
       eastern Minnesota.
Chicago, Ill.:
    Illinois River and the Fox River at Ottawa, Ill- ......                             ----- do -... .
    Mackinaw River, Ill_ ______.__.........___....__                                    S-- do....
    Spoon River, Ill.........----------------------......................                June 22, 1936
PRELIMINARY EXAMINATIONS AND SURVEYS, FLOOD CONTROL                                                                                                      1645

                                                                                                 Date ofac
                                                                                                 Locality                Transmitted               Document No.
                                        Locality                                                 Dateofact               to Congress


Kansas City, Mo.:
    Big Blue River, an affluent of the Kansas River and June 22, 1936                                                 ---
      tributaries, Kansas.
    Chariton River, Iowa-____----           _____                                         Aug. 28,1937 -
     Chariton River in Schuyler County, Mo                                     .__________________do   ...
                                                                                                       _____
     Kansas River, Kans., at Lawrence, North Lawrence,                                    June 22, 1936                -
      and immediately contiguous area.
     Little Osage River, Kans___________-- _____------_                                   Aug. 28, 1937                        --        --
    Marais des Cygnes River, Kans---_ _---                                                June 22, 1936                              ......-               .
    M arm aton River, Kans_______________ . _________..              .          .       ----- do .... .
                                                                                       __
     Missouri and Kansas Rivers, Mo., and Kans., at ____ do-........
       Kansas Citys.
     Republican River, Nebr. and Kans______________                                              do....
     Smoky Hill River at Manhattan, Kans, ___-                                ________do ...                        --------------
    Smoky Hill River, Kans- .___ -_________-___-  --                                   -_.----- do-...---.........
    Weldon River, Mo .              .------------------          --------------.                 do ..---            ------
Omaha, Nebr.:
     Bad River from Philip to Fort Pierre, S.                 Dak       ________          Aug.       28, 1937
     Belle Fourche River and tributaries, Wyoming .......                                 June 22, 1936
     Big' Horn River and tributaries, Wyoming                       ...                          do                    -------------
    Boyer River, Iowa___________________-----------------                                 Aug. 28, 1937
     Cherry Creek and its tributaries, Colorado- ___-                                     . -I_____do_    ._____
     Floyd River, Iowa ---------            ---      -----------                 --- --          do--                    --------..
     Keyapaha River, S. Dak                                                                      do-----              ----
     Little Sioux River, Iowa _-.---...--               __------------ ..... __-                 do______                         _
    Nishnabotna River, Iowa ...--                                            __---do__,_
     Platte (North) River and tributaries, Wyoming- ....                                  June 22, 1936
     Platte River, in the vicinity of Schuyler, Nebr- .... __                             Aug. 28, 1937 _
     Powder River and tributaries, Wyoming--...                             _ __ ..       June 22, 1936
     White River, S. Dak                ._________.__.  .______-----.... Aug. 28, 1937
     Yellowstone River, Mont____...                   .............
                                                   __.......---                      _-----do_
Nashville, Tenn.:
     Cataco Creek and its branches, Morgan County, Ala_ June 22, 1936
     Clarksville and Nashville, Tenn., with a view to sub- Aug. 28, 1937 -
       mitting comprehensive plans for flood protection.
     Cumberland River and its tributaries, in the vicinity ..... do..                                               ---------------
      of Nashville, Tenn.
     Cumberland River and its tributaries, in the vicinity ..... do-................------
       of Clarksville, Tenn.
     Flint Creek and its branches, Morgan County, Ala___ June 22, 1936 -
     Flint River, Ala., and Tenn---------..              --. ..----- _-------- do .--                            --            - ---
     Paint Rock River, Ala______.......       ____________                          _ --- do________------------
Pittsburgh, Pa.:
    Allegheny River, Pa., tributaries, sources, and head- _-- do ..----..........-----
       waters.
     Buckhannon River and Middle Fork River and their                                     Aug. 28, 1937
      tributaries, in the vicinity of Buckhannon, W. Va.
     Cheat River and tributaries, West Virginia ..-                                 --....June 22, 1936 _
     Conewango Creek and Davis Brook in Chautauqua                                        Aug. 28, 1937
       County and Cattaraugus County, N. Y.
     Girtys Run, in Allegheny County, Pa ____________-- __..                                  -..do ...           ...-------......
     Riskiminitas and Conemaugh Rivers and their tribu- _____do_.....                                             _.....
      taries, Pennsylvania.
     Kiskiminitas River, Pa __________________-
                                 .            ---                                      _-- do_........__.__                           ...
     Tygart River and tributaries in the vicinity of Elkins, _                                   do_...
                                                                                                  __--.
       W. Va.
     Youghiogheny River, Pa ._-- ____-- __                                                June 22, 1936
                                                                            ...--------------                         ----
     Youghiogheny River watershed above Dawson, Pa-__ Aug. 28, 1937
Huntington, W. Va.:
     Big Sandy River and tributaries, Kentucky ......---------                            June 22,1936                                         -
     Greenbrier River and tributaries, West Virginia----                    ....----....    -do-..---.--
Cincinnati, Ohio:
     Licking River and tributaries, Kentucky-----................----do..
     Licking River at Salyersville, Magoffin County, Ky-....... do ....
     Mad River at Springfield, Ohio ____________---------__-..                         -- do ...
     Mad River, Ohio-------                        .......-----------------------.--.. do--------...                   --
     Mill Creek Valley in Cincinnati, Ohio--            ..............---------.          Aug. 28, 1937 .........
Louisville, Ky.:
     Mud River and Wolf Creek, Ky ...                                                    June 22, 1936 .. ______
                                                                                ___...............
    Nolin River and its tributaries, Kentucky__ .........-------- .... do ..                                  -      --               ..
     Rough River and its tributaries, Kentucky---------                                          do-...         --
                                                                                                       ---............          .... ____
Duluth, Minn.: Saint Louis River, Minn_-...................                                      do-...... Aug. 4,1937
Milwaukee, Wis.:
     Fond du Lac River and tributaries, Wisconsin--.--...                                  ---- do ............
                                                                                           ...
     Fox River and tributaries, Wisconsin------------ ....................                       do......................
Detroit, Mich.:
     Clinton River, Mich___.......---------------.............                            Aug. 28, 1937 ...----------
     Saginaw River, Mich____ ...............----------------                              June 22, 1936 ...............
    Sebewaing River, Mich____   .....--.....-------------..................---- do........----------...............
Buffalo, N. Y.:
      Black River, N. Y_ ......     _____------------.....................do ......
      Cattaraugus Creek, N. Y ...---....----------------                   do ........
      Genesee River, N. Y.......----------------------- --- do....
      Moose River, N. Y_       ----       ................ ----. do
                                         ---------------                                                                ....
1646              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937



                                   Locality                                   Date of act       Transmitted
                                                                                                to Congress                           Document No.


Los Angeles, Calif.:
    Arroyo Grande Creek in the county of San Luis Aug. 28,1937
      Obispo, Calif.
    Big Sandy River, in Arizona, from the junction of .... do -........                    ............
      Trout Creek and Knight Creek on the north to the
      Bill Williams River on the south.
    Bill Williams River, Ariz ...------.....---...............--------- .... do........ ..............
    Cucamonga Creek, Deer Creek, San Antonio Creek, .... do-... .. .
      and Chino Creek, Calif.
    Gila River and tributaries, above the San Carlos June 22, 1936
      project diversion dam, Arizona and New Mexico.
    Gila River, in Arizona, from Gillespie Dam down- Aug. 28, 1937 .                                 -
      stream to a point near Wellton.
    Green River and tributaries, Wyoming._...._                  ..-.
                                                                   __. .  June 22,1936 -              -
    Hassayampa River, Ariz_......__......__           ............ --...do ........
    Little Colorado River and its tributaries upstream Aug. 28, 1937 -
      from the boundary of the Navajo Indian Reserva-
      tion in Arizona.
    Los Angeles River and tributaries, California ..._....                June 22, 1936
    Lytle Creek, Waterman Canyon, in the county of San Aug. 28, 1937 .
      Bernardino, Calif.
    Mojave River, in the county of San Bernardino, Calif_ --....                do...  . ---------------
    Queen Creek, Ariz. -_- ._....              . .             . __ .. June 22, 1936 ---------------
                                                              _.
    Sabino Canyon, Pima County, Ariz ................                       -..do --       ---------------
                            .....________
    San Diego River, Calif __       .    .._______.....                  --.. do____ ---------------
    San Diego, San Luis Rey, and Tia Juana Rivers, San                     ..---do--       ---------------
      Diego County, Calif.
    San Gabriel River and tributaries, California ....... .....do ...........
    San Jacinto River and Bautiste Creek in the county of Aug. 28,1937 ..............
      Riverside, Calif.
    Santa Ana River and Banning Canyon in counties of . .do .....                       ............
      San Bernardino, and Riverside, Calif.
    Santa Ana River and tributaries, California .........                 ... do ..
     Santa Clara River, Calif ...                            _____________     S___do..
     Santa Cruz (lower) River, Pinal County, Ariz -....                      June 22,1936 -----        ~----------
     Santa Cruz River, Santa Cruz County, Ariz___---..                                --
                                                                             .. ..do-__
     Santa Maria River, Calif                .   .______________
                                                               _____-__      Aug. 28,1937
    Sonoita River, Santa Cruz County, Ariz-...__________                     June 22,1936     - - -   - -   -       - - -   -



    Ventura Harbor, Calif .... ...............                                 ..do -_-....   - - -   - -       -    - -        - -



    Ventura River, Ventura County, Calif___________                          Aug. 28,1937
    Whitewater River, Calif ______..._____... ._-.___-   .            . do.. .
San Francisco, Calif.:
    Alameda and San Lorenzo Creeks and their tributa- .... do-I-------
      ries, California.
    Eel River, Humboldt County, Calif_....__.____ ...               June 22.1936 ------------ -
    Klamath River and tributaries, Oregon-.. .........             Aug. 28,1937 -------- - --
    Mad River, Humboldt County, Cahlif__._                         June 22,1936 --------------
    Pajaro River, Calif_                                           Aug. 28,1937 ----- - - - -
    Pajaro River, San Benito County, Calif .. __..                 June 22,1936 ------ - - - -
    Russian River, Calif...._____                .....
                                         .. :.______        __.__   Aug. 28.1937 ---- - - - - -
    Salinas River, Calif...______________                          ... .do.......
    Salinas River. Monterey County, Calif_..........._             June   22, 1936            -------------



Sacramento, Calif.:
    American,    Feather,  Yuba,    and   Bear   Rivers, tributa-  June    22,1936 ...._________
     ries of Sacramento River.
    Bear Creek, Calif___ __                                                                   ---------------

    Big Deadmans Creek, Califf.-_--_-_----___------- .....              do .... ---------------
    Black Rascal Creek, Calif ..________ __ __________ L...8do.1937 ---------------
    Burns Creek, Calif ______________________________ ----- -do         d o- ....
                                                                             .....---------------
    Canal Creek, Calif....................................                         ---------------
    Duck Creek, Calif._-          ------_ ---------- -            . ..do___
                                                                        do .... ---------------
     Fahrens Creek, Calif.................................                        _do .       ---------------
     Little Deadmans Creek, Calif_ _ __                                       -   do--- --
                                                                                              ---------------
     Mariposa Creek, Calif_.-_______________
                                        ..   __........                                       ---------------
     Miles Creek, Calif .. ... ...... ....... . ..      .                                     ---------------
     Owens Creek, Cahf              ... .-                   _           -                    ---------------
    Sacramento and San Joaquin River Valleys, Calif .-.           - do ......                 ---------------
    San Joaquin River from Herndon to Antioch, and its           - do.. ..                    ---------------
      main east side tributaries, California.
Portland, Oreg.:
   Alsea River and tributaries, Oregon .........
                                            -          ....     .ug. 28,1937
    Chetco River and tributaries, Oregon_                        -do.         ---------------
    Clatskanie River and tributaries, Oregon        --........      do ..     ---------------
    Columbia River and tributaries, Washington .-.    -..      June 22,1936 ---------------
    Coos River and tributaries, Oregon and Washington_ _ -- do .... ---------------
    Coquille River and tributaries, Oregon ----                ___do
    Cowlitz River and tributaries, Washington........... _.
                                                                       _._
                                                                 ...do.... . ---------------
                                     ..
    Kilchis River, Oreg.......----------------- .... -              do .... ---------------   ---------------




   Lewis River and tributaries, Washington__---_-_ __ ._         _ do ... ..                   Sept     .   23.1937

    Miami River, Oreg ...._______           .____ .______________ do ..                       ---------------

   Nehalem River and tributaries, Clatsop, Columbia, .....          do .... ---------------
      and Washington Counties, Oreg.
   Nehalem River, Oreg..............------- _..... ... _ .....      do . .
PRELIMINARY EXAMINATIONS AND SURVEYS, FLOOD CONTROL
                                                                                                                                             1647

                                                                                           Date of act            Transmitted
                                    Locality
                                                                                                                  to Congress        Document No.
                                                                                    I                        I




Portland, Oreg.-Continued.
    Nestucca River and its tributaries, Oregon........___                                           Aug. 28, 1937
    Rogue River and tributaries, Oregon....-------------                                           June 22, 1936
    Siletz River and tributaries, Oregon __......                                          __--.. --         do- ..--- Sept. 23, 1937
    Siuslaw River and tributaries, Oregon ----... .--                                     _        _-_ do ...      -.         ... do ...-.
    Smith River and tributaries, Oregon__-----                                                     Aug. 28, 1937
    Tillamook River, Oreg---------                             .                  __         .     June 22, 1936
    Trask.River, Oreg ..---------------- ----------------                                         _-. do .--.-
    Umpqua River and tributaries, Oregon--____..--_ _- ___do.. .
    Willamette River, Oreg_.                     ---------            --         __._             . ..    .d o - - - - - - -
    Wilson River, Oreg -_ _-____--..                        __... ... .__.....
    Yaquina River and tributaries, Wyoming ........                                          -      ..- do_
Bonneville, Oreg.:
    Burnt River and tributaries, Oregon -----
    Deschutes River and tributaries, Oregon ..
                                                                                        --- .--    Aug. 28, 1937
                                                                                      _---...- ----- do - ----
                                                                                                                 ---------------
    Grande Ronde River and tributaries, Oregon ---...
    M alheur River and tributaries, Oregon _...- - --
                                                                                                  .....          ---------------
                                                                                                            d o -- -----
                                                                                               -- .....do .---   ---------------
    Owyhee River and tributaries, Oregon__------ - -
    Powder River and tributaries, Oregon .------ ---.                                        .
                                                                                                                 ---------------
                                                                                                                 ---------------
                                                                                                       ___do .----

    Salmon River, Oreg_.----
    Sandy River and tributaries, Oregon .------------
                                                        -----------                ---
                                                                                                       ..do .. ..
                                                                                                   June 22, 1936
                                                                                                   Aug. 28, 1937
                                                                                                                 ---------------
                                                                                                                 ---------------
    Snake River and tributaries, Wyoming_--------------
    Walla Walla River and tributaries, Washington _ -_____ do ------
    W illow Creek, Oreg................                          .................
                                                                                                   June 22,1936

                                                                                                   Aug. 28, 1937
                                                                                                                 ---------------
                                                                                                                 ---------------




                                                                                                                 ---------------
Seattle, Wash.:
    Cedar River, Wash---------------------------------
    Chehalis River and tributaries, Washisfgton                      ---------
                                                                                                   June 22,1936  ---------------
                                                                                                                 ---------------
                                                                                                                         --
    Columbia River and tributaries, Washington
    Duwamish River, Wash ------------.------                                         ----
                                                                                                  --.. do
                                                                                        - - - - .....do .--
                                                                                                    ...do--.....
                                                                                                                 ---------------
    Flathead River and tributaries in Flathead County, Aug. 28,1937                                              ---------------
                                                                                                                 ---------------
       Mont.
    Gollsborough Creek, Wash..-------------------
    Greed River, Wiash
                                                                                                   June. 22, 1936---------------
    Lowell Creek, Alaska -.......                ........-....                 --.       ... ..        --- do
                                                                                                            do- . - - - -
                                                                                                                 Feb.   19,   193?           H. 154/75/1.
         D o . --- -- - -- - - - - - - - - - - - -                                                 Aug. 28,1937 ---------------
    Nisqually    River,      Wash_               --------------------                              June 22, 1936 ---------------
    Nooksack River, W ash -_..........................                                            -----     d o .----
    Samamish River, Wash ---------------------------..                .                 -----           --.
                                                                                                            d o - ------     ---------------
                                                                                                            do....-- ---------------
    Skagit River and tributaries, Washington......-.--..
    Skagit River (North and South Forks), from Mount                                                Aug. 28, 1937 ---------------
       Vernon to Skagit Bay, Wash.
    Skagway River, in the vicinity of Skagway, Alaska ---                                              .--- do ...... ---------------
    Skykomish River, Wash.._-                        -       ___ _---                              June 22, 1936 ---------------
    Snohomish River and tributaries, Washington .......                                                                      ---------------
    Snoqualmie River, Wash_-                                   -            -                               do .......---------------                -----
    S p ok a ne R i v e r a n d t r i b u t a r ies . I d ah o . . . . . . . . . . . . . . . . -. do ...... ---------------
                                                                                        -----   do--------
                                                                                                                             ---------------
    Stilaguamish River, Wash--                                                          ----
                                                                                          do--------                         ---------------
    Tanana River and Chena Slough, Alaska-..........                                                __ do - ------------------
    Whatcom Creek at Bellingham, Wash--............                                                 Aug. 28, 1937 ---------------
    Yakima River and tributaries, Washington--- -------                                            June 22, 1936 ---------------
Special boards:
    Canisteo River, N. Y.--- ---                        ----         ------                                                  ---------------          -do........
    Cayuga Lake, N. Y.-                      --             --.--           __                                   ...--..---------------              -do
    Chemung River, N. Y.                                                     __                        .- do .... ---------------
    Chenango River, N. Y....                                 .                                                               ---------------
    Cohoeton River, N. Y---                                                                                                                          -do........
                                                                                                                             ---------------
    Keul Lake, N. Y---                                                                                 .... do_ ..- ..       ---------------
    La'ckawan'i iRiver,          Pa.------------------                                            ---       do ...           ---------------
    Onondaga Creek, N. Y. -_-_..-..................                                                                          ---------------
    Oswego, Oneida. Seneca, and Clyde Rivers, N. Y..... . .. do ......---------------
    Sandusky River, Ohio ...........                                             ..                ....do .....
    Scioto and Sandusky Rivers and their tributaries, Aug. 28,1937 ---------------                                           ---------------
       Ohio.
    Seneca Creek, N. Y_                     -          -            -.                             June 22,1936
    Susqtuehanna River, N. Y. and Pa .....                                                  _               do..... ..                               ---
    Susquehanna River, Pa., tributaries, sources and                                                        do............... ....                   -...
       headwaters.
    Tioga River, N. Y ---------- -------- ---- do-- -- ---- -- -- -- --
    Tioghnioga River, N. Y--------                                                                          do ---......                             -....



   Section 7 of the Flood Control Act approved June 22, 1936, author-
izes and directs the Secretary of War to continue surveys, studies,
and reports at the following-named localities, where, according to
the surveys and estimates already made, opportunities appear to
exist for useful flood-control operations with economical development

            20196-37-pt. 1-                     104
1648     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of hydroelectric power whenever sufficient markets to absorb such
power become available:
Norfolk, Va.: Reservoirs in Roanoke River, N. C.
Wilmington, N. C.: Reservoirs in Tar River, N. C.
Charleston, S. C.:
    Rocky River (Loves Ford and Crumps Ford), N. C.
    Wilkesboro Dam, Yadkin River, N. C.
Savannah, Ga.: Clark Hill Reservoir, Ga.
Vicksburg, Miss.: Denison Reservoir, Tex.
Memphis, Tenn.:
    Reservoirs in Grand (Neosho) River.
    Table Rock Reservoir, Mo.
    Wild Cat Shoals Reservoir, Ark.
Omaha, Nebr.: Big Horn Canyon Reservoir, Mont.
Seattle, Wash.: Hungry Horse Dam, Mont.

             CALIFORNIA DEBRIS COMMISSION
   This Commission, consisting of three officers of the Corps of Engi-
neers, was created by the act of Congress approved March 1, 1893
 (27 Stat. L., p. 507), as amended by the. acts of February 27, 1907
 (34 Stat. L., p. 1001), and of June 19, 1934 (48 Stat. L., pt. 1, p.
1118), and has jurisdiction and duties extending over the drainage
area of the Sacramento and San Joaquin Rivers, comprising the
great central valley of California and extending from the crest of the
Sierra Nevada on the east to that of the Coast Range on the west and
from Mount Shasta and the Pit River Basin on the north to the
.Tehachapi   Mountains on the south. These rivers empty into the
head of Suisun Bay, ultimately discharging into the Pacific Ocean
through the connecting bays and straits and the Golden Gate.
   The duties prescribed by the act creating the Commission are:
   First. To regulate hydraulic mining in such a way as to permit
its resumption and continuance under such restrictions as to prevent
the resulting debris from being carried into navigable waters or
otherwise causing damage.
   Second. To study and report upon general hydraulic and hydrau-
lic-mining conditions and matters affecting or affected by them and
to make surveys, mature and adopt plans for the purpose of improv-
ing the navigability, deepening the channels, and protecting the
banks of the rivers, and affording relief from flood damages.
   While the Commission was to "adopt" plans as a result of its
study, the act creating it did not provide means for directly carrying
them out. Congress, however, has from time to time adopted certain
of the plans formulated by the Commission and charged it with their
execution, under the direction of the Secretary of War and the super-
vision of the Chief of Engineers.
   During the past year, the Commission consisted of Col. T. H.
Jackson, Corps of Engineers, through September 14, 1936, and Col.
John J. Kingman, Corps of Engineers, beginning September 15,
1936, as presidents; Col. L. B. Chambers, Corps of Engineers
 (secretary); and Maj. E. S. J. Irvine, Corps of Engineers. The
secretary has immediate supervision of the work of the Commission.
                   CALIFORNIA DEBRIS COMMISSION                            1649
                                IMPROVEMENTS
                                                                            Page
1. Regulation of hydraulic mining and preparation of plans--------_  ---    1649
2. Treatment of the Yuba River debris situation-restraining barriers _-     1651
3. Control of floods, removal of debris, and improvement of Sacramento
     River, Calif -------------------------------------------              1654
4. Sacramento River and tributaries, Calif. (debris control) ____-    --   1663
5. Plant allotment --------------------------------------------            1665

1.   REGULATION     OF HYDRAULIC        MINING     AND   (PREPARATION OF
                                    PLANS

   Location.-Operations are largely limited to the territory between
Mount Lassen on the north and the Yosemite Valley on the south,
on the western watershed of the Sierra Nevada. (See U. S. Geo-
logical Survey sheets for the area, 25 in number.)
   Existing project.-This provides for regulating hydraulic-mining
operations, planning the improvement of conditions upon the Sacra-
mento and San Joaquin Rivers and their tributaries affected by such
operations, and the preparation of plans to enable hydraulic mining
to be resumed. On application by prospective miners, full investiga-
tion is made by the Commission, and permits to operate are issued
to those who provide satisfactory debris-restraining basins by con-
struction of suitable dams where necessary. The estimate of cost
of this work, revised in 1916, is $18,000 per annum. The existing
project, adopted by the act of March 1, 1893, was amended by the,
acts of February 27, 1907, and June 19, 1934. (For latest published
map see Annual Report for 1913, p. 3170.)
   Local cooperation.-Mine owners are required to bear all expenses
incurred in complying with the orders of the Commission for regu-
lation of mining and restraint of debris.
   Terminal facilities.-None.
    Operations and results during fiscal year.-Fifty-nine hydraulic
mining inspections were made, at a cost of $3,970.65. Administra-
tive work overlaps that of improvements nos. 2 and 3 hereunder and
that of the Sacramento engineer district. Surveys to determine
quantities of gravel mined at licensed mines, and administration, cost
$10,812.34. The total cost of all activities was $14,782.99. Total ex-
penditures were $13,982.21.
    Condition at end of fiscal year.-The Commission has received
1,193 applications for hydraulic mining licenses. Thirty-seven mines
are licensed. Surveys have been made of those portions of the Yuba,
Feather, Bear, and American Rivers containing large deposits of
mining debris; of active mines, except those on the North Fork of
Yuba River behind Bullards Bar Reservoir: and of Bullards Bar
and Combie Reservoirs, to determine the rate of debris movement
into the several reservoirs. Plans have been made for flood and
debris control in the Sacramento River Basin, and flood control in
the San Joaquin River Basin. (See Improvements nos. 2, 3, and 4
hereunder.)
    Work remaining to be done is, in general, the continuation of
the above or similar operations. The total cost of all work was $575,-
561.54, for maintenance. The total expenditures were $574,605.75.
    Proposed operations.-The balance unexpended July 1, 1937,
amounting to $1,873.18, including accounts receivable, together with
1650               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

an allotment of $15,000 made during July 1937, will be used for pay-
ment of accounts payable, $803.71, and the remainder will be applied
to maintenance as follows:
  Applications for permission to mine by hydraulic process will be
duly investigated and considered; mines operating under existing
peirmits will be regulated and necessary inspections, preparation,
and approval of plans, etc., will be made as during preceding years.
Studies, examinations, surveys, and miscellaneous operations will be
continued.
   In order that the work as carried on in preceding years by the
commission may be continued and that the demands of the State
and general public requiring consultation with the commission may
be met and the result of the commission's studies made available
thereto, the additional sum of $15,000 can be profitably expended
during the fiscal year 1939.
                                        Cost and financial summary

Cost of new work to June 30, 1937
Cost of maintenance to June 30, 1937-----------------------                                                  $575, 561. 54
      Total cost of permanent work to June 30, 1937--------   __-                                             575, 561.54
Undistributed costs June 30, 1937-----__ ---------------    __-                                                 -- 152. 08

      Net total cost to June 30, 1967--
                                    7     --------------                                                      575, 409, 46
Minus accounts payable June 30, 1937-----------------------                                                        803. 71
     Net total expenditures   ---------------------------                                                     574, 605. 75
Unexpended balance June 30, 1937____                                                                               873. 18
                                                                                                                1________------1,
             Total amount appropriated to June 30, 1937                               -----------             576. 478. 93

            Fiscal year ending June 30                     1933          1934          1935           1936            1937

Cost of new work---------   ..-..--.------------------
                            ..--- - $6, 996.47
Cost of maintenance_............--                     $9, 643.66                    $8, 548.38    $16,111.08       $14,782.99
Total expended....-...        ...--         . ..
                                        ...---            6, 676. 99    9, 143. 45    8, 219. 45    16, 156. 51      13, 982. 21
Allotted.-.-..---....---..   - .---..   --         .      6, 666. 64   19, 550. 49    9,657. 59     14, 000. 00       6, 000. 00


Balance unexpended July 1, 1936-------------------------         - $9, 855. 39
Amount allotted from War Department .Appropriation Act approved
  May 15, 1036-- ------------------------                -------    6, 000. 00
Amount to be accounted for-- --    ---------------                - .-  * 15, 855. 39
Gross amount expended____1___-    ___________         ___   $13, 983. 61.
Less reimbursements collected --- __-____-         -_______         1. 40
                                                                          13, 982. 21
      Balance unexpended June 30, 1937__--______-___________                                                      1,873. 18
Outstanding liabilities June 30, 1937 ___---___-______________                                                      881.91
     Balance available June 30, 1937 _____ ____-_______-_____       991. 27
Amount allotted from War Department Civil Appropriation Act ap-
proved July 19, 1937   -------------------------------------   15, 000. 00
            Amount available for fiscal year 1938______________________ 15,991. 27
Amount that can be profitably expended in fiscal year ending June
                                               -- - - -
    30, 1939, for maintenance                                                                 _____               15, 000. 00
     SExclusive of available funds.
                             CALIFORNIA DEBRIS COMMISSION                                       1651
                                                                                                       .-
2. TREATMENT OF THE YUBA RIVER DEBRIS SITUATION-RESTRAIN
                       ING BARRIERS

   Location.-The works are located on the Yuba River between
Marysville and the place where the river emerges from the foothills,
near Hammonton, some 10 miles easterly from Marysville, or about
9 miles below the Narrows. (See U. S. Geological Survey topo-
graphic map of the Sacramento Valley, Calif.)
   Existing project.-This provides for storage of mining debris
within the bed of the Yuba River by means of a debris barrier, and by
the restraint of the flow channel to narrow limits by means of training
walls and other regulation works. The object of storing this debris
in the Yuba River-a nonnavigable stream-is to keep it from pass-
ing into the Sacramento and Feather Rivers to the detriment of
navigation therein. The variation in water levels due to floods is
about 12 feet. The estimate of cost for new work made in 1900 was
$800,000, one-half of which was appropriated by the State of Cali-
fornia. The latest (1922) approved estimate for annual cost of
maintenance is $30,000. (For details of this project in its original
form see Annual Report, 1917, page 1810, "Previous projects.")
   The existing project was adopted in a rather indefinite form by the
River and Harbor Act of June 3, 1896, and in its more definite form
by River and Harbor Act of June 13, 1902 (H. Doc. No. 431, 56th
Cong., 1st sess.). (For latest published map see U. S. Geological Sur-
vey topographic map of the Sacramento Valley, Calif.)
   Local cooperation.-Fully complied with.
   Terminal facilities.-None.
   Operations and results during the fiscal year-Maintenance.-
Hired labor was used to clear the river channel of brush, remove
snags and drift, blast hardpan, and cut trees overhanging from cav-
ing banks, at a cost of $2,830.80. A fish ladder was constructed at
the southerly end of the Daguerre Point Dam, at a cost of $285.98.
Total cost of work was $3,116.78. Total expenditures were $3,157.10,
all from United States funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935. Three training walls, having a total length of 85,100
feet and providing two 500-foot channels, have been built, partly by
gold-dredging companies and partly by the United States. A cut was
made through Daguerre Point and a concrete spillway constructed
therein. The channel between Marysville and the training walls has
been cleared of obstructions, dikes have been installed, and old sand
channels have been blocked. The result has been to hold millions of
yards of mining debris in the Yuba River which would otherwise
have passed into the navigable channels of the Feather and Sacra-
mento Rivers.
  The total costs were as follows:

                                                           New work        Maintenance        Total

                              -__
                              ___________
United States funds--.....-......                 ___      $361, 482. 28    $138, 723.95    $500, 206. 23
                   ---
Contributed funds- ____..     ______    __   --             361, 776. 74
                                                        -___________         135, 272. 38    497, 049. 12
     Total-         -----------------                       723, 259. 02     273, 996. 33    997, 255. 35
1652          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The total expenditures were $997,255.35, of which $500,206.23 were
United States funds and $497,049.12 contributed funds.
   Proposed operations.-The balance unexpended July 1, 1937,
amounting to $6,223.69, together with an allotment of $5,000 made
during July 1937; less $500 revoked in July 1937, and with $2,500 to
be contributed by the State of California, will be used as needed, be-
tween July and December 1937, to clear the channel between Marys-
ville and Daguerre Point by removal of snags, brush, and trees, and
blasting of hardpan; to confine the river to this channel by damming
the heads of old channels, to repair, reinforce, and protect the Daguerre
Point Dam; and for bank protection on both banks from 4 to 9 miles
above Marysville.
   The additional sum of $15,000 (together with an equal contribution
from the State of California), can be profitably expended as needed
during the fiscal year 1939, between July and December 1938, on work
similar to the above. The work is necessary to prevent debris enter-
ing the Feather and Sacramento Rivers.
                                    Cost and financial summary
                                          UNITED STATES FUNDS

Cost of new work to June 30, 1937-----------------------------___                                           $361, 482.28
Cost of maintenance to June 30, 1937-111111111111111111___11                                                 138, 723. 95
       Total cost of permanent work to June 30, 1937_______________                                          500, 206. 23
Net total expenditures ____---  ____-_-____--                                                                500, 206. 23
Unexpended balance June 30, 1937                                                              _                   533. 29'
         Total amount appropriated to June 30, 1937--------------                                            500, 739. 52

         Fiscal year ending June 30                   1933          1934          1935               1936           1937


Cost of new work----------      -------- ---
Cost of maintenance--   ---
            wr-------------$10,                         944. 03   $2, 668.85    $6, 135.78        $1, 918. 69      $3, 116. 78
Total expended......-----------------------..10, 944. 03           3, 373. 39    5, 317. 81         1,991. 80       3, 157. 10
Allotted..----------------------------            14, 762. 1       2, 476. 71   15, 000. 00       -7, 000. 00     -2, 000. 00


Balance unexpended July 1, 1936 -_____________________________                                                  $5, 690. 39
Deductions on account of revocation of allotment -----------------                                               2, 000. 00
      Net amount to be accounted for ------------------------                                                    3, 690. 39
Gross amount expended--- --------------------------------------                                                  3, 157. 10
     Balance unexpended June 30, 1937-------------------------                                                     533.29
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937--_ __                                                                                    5, 000. 00

         Amount available for fiscal year 1938---------------------                                              5, 533. 29
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance 1                    ------------                                        -         15, 000. 00
   1 Exclusive of available funds.
                                               CONTRIBUTED        FUNDS

Cost of new work to June 30, 1937                                                                            361, 776. 74
                                                                                                            $--------------------
Cost of maintenance to June 30, 1937____                              __-_--------_                          135, 272. 38
         Total cost of permanent work to June 30, 1937-----_                                                 497, 049. 12
                              CALIFORNIA DEBRIS COMMISSION                                                  1653
Net total expenditures--- ------------------------------------- $497, 049. 12
Unexpended balance June 30, 1937-------------------------------    5, 690. 40

          Total amount contributed to June 30, 1937______- ______                                502, 739. 52

            Fiscal year ending June 30       1933              1934        1935          1936               1937


Cost of new work-------------------                              --------------------------------
Cost of maintenance-------------------$4, 828.96         $11,8535. 79    $4,:576.58    $3, 436. 75

Total expended------------------------      4, 828. 96    11, 535. 79     4, 576. 58    3, 436. 75..._..5
Contributed-      __----------------_-     15, 000.00 ----------          6,000. 00                    $4,239. 52
                                                                                             ..------------

Balance unexpended July 1, 1936_ -------------------------------                                     $1, 450. 88
Amount contributed by State of California -----------------------                                     4, 239. 52
      Amount to be accounted for--------                  -----------                                 5, 690. 40
Balance unexpended June 30, 1937-----------------------------                                         5, 690. 40
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance             1__________-_-                                              15, 000. 00
   1Exclusive of available funds.

           CONSOLIDATED COST AND, FINANCIAL SUMMARY FOR YUBA RIVER, CALIF.

Cost of new work to June 30, 1937__.---7 ------------ _____      $723, 259. 02
Cost of maintenance to June 30, 1937----------------------------273, 996. 33.

          Total cost of permanent work to June 30, 1967_____----__                              997, 255. 35

Net total expenditures ------------- ---  -_                                                     997, 255. 35
Unexpended balance June 30, 1937---------------------1---1-                                        6, 223. 69

          Total amount appropriated and contributed to June 30, 1937_ 1,003, 479. 04

          Fiscal year ending June 30         1933              1934        1935          1936               1937

Cost of new work--------------------                --------------------------------
Total expended_---___-------------__       15, 772. 99    14, 909. 18    9, 894. 39     5,428. 55           3, 157. 10
Allotted and contributed -------------     29,762.81          2,476.71   21,000.00     -7,000.00            2, 239.52


Balance unexpended July 1, 1936    ---------------------------                                       $7, 141. 27
Amount contributed by State of California------------------_                                          4, 239. 52

      Amount to be accounted for               .---------.                                           11, 380. 79
Deductions on account of revocation of allotment------------------                                    2, 000. 00
      Net amount to be accounted for_ --------  _____      -______ 9, 380. 79
Gross amount expended-- ----------------------------------------   3, 157. 10
     Balance unexpended June 30, 1937-----------------------                                          6, 223. 69
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------____                                            5, 009. 00

          Amount available for fiscal year 1938 ----------------                        __           11, 223. 69
Amount that can be profitably expended in fiscal year ending June
   30, 1939, for maintenance                   ------------                             __           30, 000. 00
   1   Exclusive of available funds.
1654     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

3. CONTROL OF FLOODS, REMOVAL OF DEBRIS, AND IMPROVEMENT
                OF SACRAMENTO RIVER, CALIF.

  Location.-For location of Sacramento River see page 1459.
   Previous projects.-The original project was adopted by the River
and Harbor Act of June 25, 1910, and was formerly reported under
the title "Alleviation of debris conditions in the Sacramento and
Feather Rivers." Costs under this project were $250,328.71 from
United States funds and $680,000 from contributed funds, a total of
$930,328.71, all for new work, prior to beginning work under the
existing project in 1917. Total expenditures were $680,000 each from
United States funds and contributed funds. For further details of
this work see Annual Report for 1917, page 1815 et seq.
   Existing project.-This provides for enlargement of the river chan-
nel below the mouth of Cache Slough, for making two cut-offs be-
tween the mouth of the Feather River and Colusa, for construction
of four bypass weirs and the reconstruction of another, for construc-
tion of outfall gates at mouth of Butte Slough, for project drainage
pumping plants and construction of project levees; and under the
latest modification, adopted by River and Harbor Act of August 26,
1937, there is provision for a 5-year program of construction by the
United States of bank-protection works and levee set-backs; and for
maintenance, during construction of these works, of the enlarged
river channel below Cache Slough, including revetment of banks of
the cut, and maintenance and operation during this period, of the
gaging stations on navigable rivers and streams, at an estimated total
cost to the United States of $2,500,000 contingent upon cooperative
action by the State of California and other local interests, as set forth
in the following paragraph, "Local cooperation."
   Preceding the latest modification as above, the existing project as
adopted by the Flood Control Act of March 1, 1917, and modified by
the Flood Control Act of May 15, 1928, was subject to the following
provisions:
   (a) That the United States assime responsibility for execution and cost of
all work of enlargement and rectification of river channels and construction of
weirs, including future purchases of land and easements for spoil areas.
   (b) That the United States contribute one-half the cost of construction of
project levees to grade and cross-section adopted by the California Debris Com-
mission, provided the remaining funds needed be placed at the disposal of the
commission and the work be done by the latter.
   (c) That the limit set on the contribution of the United States by the act of
March 1, 1917, be increased from $5,600,000 to $17,600,000, including what has
already been appropriated.
   (d) That annual appropriations be increased to $1,000,000, the limit set by
existing law.
   (e) That the United States return to the State of California the amount ex-
pended on the project by the California Debris Commission from funds con-
tributed by the State at the time of the modification approved by the act of
May 15, 1928.
   (f) That the United States do whatever work is found necessary to maintain
the increased capacity of the channels of the rivers, sloughs, and other water-
ways, including protection of their banks, and to insure the preservation of the
weir structures in effective condition.
   (g) That the added contribution and the assumption by the United States of
the increased responsibility be conditional on the passage of legislation by the
State of California which shall provide for the execution of the remainder of
the project at the expense of the State and other local interests, in general con-
formity with the suggestions contained in the report of California Debris Com-
mission in Senate Document No. 23, Sixty-ninth Congress, first session, and
                    CALIFORNIA DEBRIS COMMISSION                           1655
which shall also make illegal any levees, ditches, or other works in the bypasses
or on the lands reserved for overflow that might reduce or impede the flood
run-off, unless approved by the California Debris Commission. Local interests
assume responsibility for the maintenance of all other parts of the project.
The operation of the movable top of the Sacramento weir is undertaken by the
State, in accordance with schedules established by the California Debris
Commission.
    In the latest modification of the project, the items (c) and (f)
preceding have been amended so as to increase the limit of total con-
tribution of the United States and set a limiting period of 5 years for
maintenance by the United States of the project works.
    The estimate of cost of the modified project, including new work
and maintenance (made in 1937) is $24,284,000, exclusive of amounts
expended under the previous project. This estimate includes the
sums to be contributed by local interests, of $3,191,500 for levee con-
struction, and $992,500 for bank-protection works and levee set-backs
during the period of the above 5-year program.
    The existing project was adopted by the Flood Control Act of
March 1, 1917 (H. Doc. No. 81, 62d Cong., 1st sess., as modified by
Rivers and Harbors Committee Doc. No. 5, 63d Cong., 1st sess.), and
modified by the Flood Control Act of May 15, 1928 (S. Doc. No. 23,
69th Cong., 1st sess.), and again modified by the River and Harbor
Act of August 26, 1937 (Senate committee print, 75th Cong., 1st sess.).
For latest published maps, see the last two documents.
    Local cooperation.-The Flood Control Act of May 15, 1928, pro-
vides that local interests are to contribute one-half the cost of con-
struction of project levees, or $3,191,500, and furnish the lands, rights-
of-way and easements therefor, subject to the conditions set forth in
 (a) to (g) in "Existing project" above. The River and Harbor Act
of August 26, 1937, adopted the latest modified project, which pro-
vides that the State of California shall assure, by appropriate legis-
lation, the maintenance of the remainder of the project, and shall hold
and save the United States from damages due to construction works,
and provides further, that the bank revetment for protection of levees
above Cache Slough, and the levee reconstruction recommended in
addition to that provided for in the existing project, shall not be
undertaken until the State of California, political subdivisions
thereof, or responsible local agencies have agreed to provide, without
cost to the United States all lands, easements, and rights-of-way for
said works, including the cost of all alterations to highways, road
crossings, and drainage and irrigation facilities incident to the work,
and have contributed one-third of the cost of bank revetment and
levee reconstruction, with the understanding that the contribution
of funds will be made as required by the progress of the work.
   Terminal facilities.-See page 1460.
   Operations and results during fiscal year--new work.--Govern-
ment plant and hired labor removed 498,030 cubic yards from the
project channel below Cache Slough as channel enlargement, at a
cost of $62,890.22, including work on spoil area, and placed 16,274
tons of riprap stone as shore protection in that vicinity, at a cost of
$57,144.64. Clamshell dredging plant under contract removed 53,200
cubic yards at a cost of $8,415.93 as channel enlargement incidental
to placing fills behind the shore-protection work. Contractors placed
3,715,371 cubic yards in levees along Yolo bypass, Sacramento River,
1656        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

American River, Feather River, Bear River, and other tributaries, at
a cost of $726,733.51, of which $2,736.51 were charged to Public Works
funds. Preliminary surveys for levees were made and miscellaneous
levee work was done, by hired labor, at a total cost of $22,179.13;
84,508 cubic yards were removed in cutting down the approach slope
to Colusa Weir, by contract, at a cost of $9,032.46. Additional costs
on account of a claim allowed by the Comptroller General for previ-
ous contract work on construction of the outfall gates at the junction
of the main river with Butte Slough, near Colusa, were $6,635.07.
Contract work on Sutter bypass pumping plants cost $9,713.29, and
miscellaneous work by hired labor cost $8,182.68, all charged jointly
to Public Works and contributed funds.
   The following work was done by hired labor and Government or
hired plant in levee set-back and bank-protection activities, at various
places on the main river from the mouth of Cache Slough to above
Colusa, at a total cost of $472,219.07; 16,376 linear feet of levee were
set back, with a total embankment of 329,551 cubic yards; 3.060 snags
and piles were removed and 40.30 acres cleared of brush; 198,096
cubic yards were placed on banks; 10,091 squares of mattress were
constructed, with 15,236 tons of rock placed on them; 30,004 tons of
rock were used to pave banks and build rock walls, and other miscella-
neous work was done. Surveys for bank-protection work were made
and 7,061 trees were cut along caving banks by hired labor and Gov-
ernment plant, at a total cost of $37,195.12. Clamshell dredging plant
under contract placed 39,180 cubic yards as levee fills and removed
obstructions, in connection with bank-protection work, at a total cost
of $17,392.92.
   Maintenance.-(All by Government plant and hired labor.) One
hundred and seventy-eight thousand and fifty cubic yards were re-
moved from the river channel near the mouth' of Cache Slough, at a
cost of $24,562.51, including work on spoil area. At Colusa Weir an
old cobblestone revetment was removed, the. bank sloped and a new
revetment placed, and a revetment for protection of guide levees was
placed, at a total cost of $20,021.10. Gaging stations were con-
structed, and discharge measurements taken, at a total cost of
$5,428.39.
   Total cost of all work under this project was as follows:

                                                                 New work          Maintenance      Total

United States funds:
   Regular appropriation___________   ________                   $821, 382. 22         $50, 012    $871, 394. 22
   Public Works funds_              ___ ___ ___-__- ___      _     -_______.
                                                                  -5,  837. 07         - _          -5, 837. 07
   Total United States funds _      __________     ___________     815, 545. 15         50, 012     865, 557. 15
   Contributed funds . -     ... --. ..    ...    ...     .        622, 188. 89    _                622, 188. 89
     Total all funds__         __   _________    ____   _____     , 437, 734. 04
                                                                 1_______               50, 012   1, 487, 746. 04



  The total expenditures were $1,574,824.43, of which $952,635 54 were
United States funds and $622,188.89 contributed funds. A minus
cost and expenditure of United States Public Works funds was
caused by reimbursements from contributed funds and cancelation
of part of the obligations of the previous year.
  Condition at end of fiscal year.-The existing project is 74 percent
completed. The total excavation under the existing and previous
                            CALIFORNIA DEBRIS COMMISSION                                                         1657
projects, for new work and maintenance, is 180,254,389 cubic yards,
of which 144,174,160 cubic yards, including 2,771,500 cubic yards for
maintenance were excavated by United States hydraulic dredges,
22,707,796 cubic yards by contract hydraulic dredges, and 13,372,433
cubic yards by contract clamshell dredges. It is estimated that this
has produced a channel with a capacity of 570,000 second-feet below
Cache slough. In addition, 21,000 second feet will leave the Sacra-
mento River through Georgiana slough.
   A total of 13,681,028 cubic yards has been placed in levees along
the project waterways. Cut-offs at Collins Eddy and between Wild
Irishman and Kinneys Bends were made in 1918 and 1919, respec-
tively. Sacramento weir was completed in 1917, Fremont weir in
1924, Tisdale and Moulton weirs in 1932, and Colusa weir in 1933.
Outfall gates at Knights Landing were constructed in 1930, and at
the mouth of Butte slough in 1936. Pumping plants on Sutter
bypass are practically completed.
   For controlling depths, see report on Sacramento River navigation
project, page 1461.
   The total cost of the existing project was as follows:

                                                                     New work           Maintenance           Total

United States funds:
   Regular appropriation                             ----------- $14,405, 901. 71
                                      ..------..---------                           $360, 004. 40         $14, 765, 906. 11
   Public Works funds---....-----.....---------------------        1, 451, 380. 82------------              1,451,380. 82

    Total United States funds       ..------------ ...----------.   15, 857, 282. 53      360, 004. 40     16, 217, 286. 93
   Contributed funds-------....-----------------------               1, 723, 747. 17-        .....   ..     1, 723, 747. 17

     Total all funds......-------------------------------           17, 581, 029.70       360, 004.40      17, 941.034.10


  NOTE.-The costs reported in previous annual reports have been adjusted by transferring the costs of
bank protection work from "Maintenance" to "New work."

  The total expenditures on the existing project were $17,540,203.82,
of which $15,816,456.65 were United States funds, including $1,451,-
263.50 Public Works funds; and $1,723,747.17 contributed funds.
  Proposed operations.-The balance unexpended July 1, 1937, from
regular flood-control appropriations, including accounts receivable,
together with an allotment of $814,500 made during July 1937, and
$951,889.35 contributed or to be contributed by local interests, will be
applied as follows:
Accounts payable (local interests share $23,389.35 of this item) -...   $79, 403. 74
New work :
    Completion of existing contracts:
         (a) Building levee, along east side of Western Pacific R. R.
              from Bear River to Clark Slough, and north levee,
              Bear River ---------------------------------------         65,000. 00
        (b) Building levee, along north and south banks of Bear
              River, near mouth--------------------------------67, 000. 00
         (c) Building levee, along west side of Yolo By-Pass, along
               Cache Creek and Cache Creek Settling Basin, in
              vicinity of Woodland__                                    141, 600. 00
                 Total to complete existing contracts (one-half of
                   costs being shared by local interests)             _ 273, 600. 00
    Completion of enlargement of river channel below Cache Slough
      to mouth of river, 15 miles, from September to November,
     1937, by Government pipe-line dredge Sacramento or San
      Joaquin, including related miscellaneous work and surveys,
      and shore protection (100 percent Government cost).----_-- 70, 000. 00
1658          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

New work-Continued.
   Construction of levees under cooperative program with local in-
     terests who share one-half the cost. Tabulation follows; work
     is by contract unless otherwise stated:

                                                                                         Esti-    Esti-              Esti-
                                     Location                                           mated    mated               mated
                                                                                       quantity unit cost 1           cost


                                                                                        Cubic
(a) Sacramento River:                                                                   yards
        Left bank, below Pocket Pump, 9 miles below Sacramento.......                   20, 000        $0. 35          $7,000
        Left bank, at Brickyard, 6 miles below Sacramento__                              14, 100         . 283-         4, 000
        Right bank, at Knights Landing__________________                                 20, 000        1. 30          26, 000
        Left bank, Princeton-Butte City Road, 5 miles upstream to Par-                  44, 000          .45+          20, 000
         rott Grant Line.
        Right bank, Princeton Ferry to above Ord's Ferry ...-----------                  95, 000          .26+         25, 000
        Left bank, near Freeport _...---------------------------                         29, 000         1. 034+       30, 000
        Relocations of levees, at various locations ........... .............                      ..........          57, 000
         Total for Sacramento River. ....................    ..........                                               169, 000
(b) Feather River:
       Right bank, from Yuba City northerly to Southern Pacific R. R__ 175, 000                            .257        45, 000
       Right bank, in places, from Yuba City southerly to Sutter bypass-__      350, 000                   .286       100, 000
       Left bank, at Marysville, by Government plant_                             5, 000                   .40          2, 000
       Right bank, below Gridley Bridge._                                        22, 000                   .227+        5, 000
       Right bank, Gridley Bridge to Hamilton Bend
       South levee, Honcut Creek .         .________-
                                               _____.___
                                                                 -------------  458, 000
                                                                  ._____________100, 000
                                                                                                           .183+
                                                                                                           .16
                                                                                                                       84, 000
                                                                                                                       16, 000
         Total for Feather River ......... ..... .... ..... .....  -.... . ..........                                 252, 000
(c) Bear River: Remaining portion along northerly bank of Bear River
     and South Dry Creek...      .. ... ... . . ... . . . . ... ... . .         700, 000                   . 129-      90, 000
(d) Yolobypass:
       West side, o0uthern Paific R. R. to Sacramiento Northern R. R.,
         8 miles----------                                                      480, 000                     .18       86,400
       East side, Ryer Island, to junction of Miner and Cache sloughs.__        295, 000                   .152+       45, 000
       West side, Egbert Tract, Rio Vista to Lindsey slough -.-..--_       1, 598, 000                     .155+      248, 000
       West side, Putah Creek to Southern Pacific R. R___-_-                   920, 000                    . 159-     146, 000
          Total for Yolo bypass------------ ----------------------------- .........                                   525, 400
(e) Other tributaries:
       Along Cache slough, Haas slough, and Sacramento Northern R. R_ 1, 215, 000                          .15-       182, 000
       Along south bank of Lindsey slough         __--------------------      320, 000                     . 15        48, 000
       Along north bank of Lindsey slough        ---------------------         700, 000                    .15        105, 000
                                             __ ..... . ......
       A long W illow Slough ......-.-... ......                      ...     600, 000                     . 18       108, 000
       Completing levee, lower end of Liberty No. 2_-...                  _-                                            4, 000
          Total for other tributaries.----..       .-- _-         .                                                   447, 000
          Total for levees...         _        ...---------------------------                                       1, 483, 400
Bank protection, from mouth of Cache slough to above Colusa, at various
locations (one-third of cost contributed by local interests)-----------                                              150, 000
      Total for new work---.....................----------------------------------..                                1, 703, 400

  1Including cost of structure, etc.

Maintenance:
   Dredging flood channels, from Cache Slough to mouth of river,
      by Government pipe-line dredge Sacramento or San Joaquin,
      January to April 1938-------------------------------         $100, 000.00
   Repair and preservation of structures for which the United
      States is responsible, including weirs and outfall gates and
      their approach and talus channels, and bank protection where
      needed in front of these structures ---------------------      40, 000. 00

            Total for maintenance------------------------------140, 000. 00

          Grand total-----------------------------------2,                                                      196, 403. 74
      Balance available July 1, 1938_                                   ------------                             86, 608. 90

         Total-------              -------------------------------------                                   2, 283, 012. 64
  There were unobligated Public Works funds on hand on July 1,
1937, in the amount of $35,089.30.    It is proposed to apply them
to regular work during the fiscal year 1938.
                                   CALIFORNIA DEBRIS COMMISSION                                                                           1659

  The balance available July 1, 1938, together with $285,750 to be
contributed by local interests, and $460,750 of Federal funds, can be
applied during the fiscal year 1939, as follows:
  New work: Construction of levees and related work under cooperative pro-
gram with local interests who share one-half the cost. Work is by contract
unless otherwise stated.  Tabulation follows:

                                                                                                      Estimated
                                                                                                      quantity       Estimated Estimated
                                                                                                                     unit cost    cost

(a) Sacramento River:                                                      Cubic yards
        Left bank, Meridian to Butte Slough, 5 miles below Colusa.            350,000       $0. 20                                        $70,000
        Relocation of levees, at various locations.........------------- ------------------------                                          57, 000
                Total for Sacramento River....-----........--               -------..------------                    ------------         127, 000
(b) Yolo Bypass:
        West side, north levee of Putah Creek...---..........--------------.      210, 000             .15                                 31, 500
        Disposition of drainage intercepted by west levee of Yolo
         bypass...---------..--...-----.....--------......-----------------------.........---------.......                                157, 500
                Total for Yolo bypass......------------------------ ------------------------                                              189, 000

(c) Sutter Bypass:
        North levee, Tisdale Bypass                         -- ............--. ---............           323, 000              .15         48, 500
         West side, Tisdale bypass to Butte slough (5 miles below
           Colusa).........----------------------------                                     --.....      446, 000              .15         67, 000
                                          ....................-------.......
                Total for Sutter Bypass-------------                                                  .....         ........              115,500
(d) Other tributaries: Georgiana Slough, both banks-------------.............                            200,000               .20         40,000
Bank protection, from mouth of Cache Slough to above Colusa, at
various locations (one-third of cost contributed by local interests)--. -----------------------                                          150,000
       Total for new work                 --------------------------------------------------------                                        621, 500

Maintenance :
    Dredging flood channels, including shore protection, from Cache
      Slough to mouth of river, 15 miles, by Government pipe-
      line dredge Sacramento or San Joaquin, January to March,          0
      1939---------------------------------------------------- $95, 000. 00
    Repair and preservation of structures for which the United
      States is responsible, including weirs and out-fall gates and
      their approach and talus channels, and bank protection where
      needed in front of structures-----------------------------    30, 000. 00
                 Total for maintenance-------------------------------125,                                                                000.00

              Grand total---------- ------------------------------- 746, 500. 00
       Balan ce available-- ---------------------------------------- 86, 608. 90
                 Total-----------------------------------------------                                                                833, 108. 90
                                                Cost and financial summary
                                                          REGULAR FUNDS

Cost of new work to June 30, 1937_--
                                 .--------------          ____
Cost of maintenance to June 30, 1937------------------------
                                                                                                                          1$14,1360,
                                                                                                                                656, 230. 42
                                                                                                                                     004.40
      Total cost of permanent work to June 30, 1937_________     15, 016, 234. 82
Undistributed costs June 30, 1937 ---- ___     ----___   -__ -__     107, 537. 22
      Net total cost to June 30, 1937____   -        -_______-_____ 15, 123, 772. 04
Plus accounts receivable June 30, 1937-__----......------__                  824. 85
       Gross total costs to June 30, 1937__--_________________         15, 124, 596. 89
  SAdjusted to classify bank protection work above the mouth of Cache Slough as "New
work" instead of "Maintenance", as shown in previous reports.
1660               REPORT OF CHIEF OF ENGINEERS, U. S, ARMY, 1937

Minus accounts payable June 30, 1937________________--                                                                            $79, 403. 74

     Net total expenditures____-------------- --------                                                                     15, 045, 193. 15
Unexpended balance June 30, 1937 ----------------------------                                                                  515, 798. 44

            Total amount appropriated to June 30, 1937                                             ------------            15, 560, 991. 59

     Fiscal year ending June 30                          1933                  1934                 1935            1936               1937


Cost of new work 1--      -     _ $1, 178, 914. 57                         $108, 640. 93         $418, 122. 00   $352, 268. 88       $821, 382. 22
Cost of maintenance 1-........-         6, 704. 87                            7, 465. 27           12, 962. 24     58, 150. 20         50, 012. 00

        Total cost-        __-------------         1,185, 619. 44            116, 106. 20         431, 084. 24    410, 419. 08        871, 394. 22

Total expended..-----.. -----------                    976, 812. 07         140, 837. 26          244, 104. 66    365, 346. 23        953, 844. 36

Allotted_.--      _    ____     ___---       _     1, 719, 418. 40         -17, 466. 85           3C5, 140. 04    734, 000. 00-----------..


Balance unexpended July 1, 1936_ __       _   ___-----                                                                     $1, 469, 642. 80
Gross amount expended__----____----------       $1, 519, 887. 38
Less reimbursements collected________-_______       566, 043. 02
                                                                                                                                  953, 844. 36

      Balance unexpended June 30, 1937______________                                                                              515, 798. 44
Outstanding liabilities June 30, 1937          $46, 679. 52           ----
Amount covered by uncompleted contracts....    177, 959. 14
                                                                                                                                  224, 638. 66

     Balance available June 30, 1937 ---------------------                                                                        291,159. 78
Accounts receivable June 30, 1937__----                                                                                               824. 85

            Unobligated balance available June 30, 1937                                                                          2 291, 984. 63

Amount (estimated) required to be appropriated for comple-
tion of existing project 3____________________-__--                                                                       2, 500, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939: - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -
   For new work 3                                                                                                                335, 750. 00
  For maintenance ---------------------------------------                                                                        125, 000. 00
            Total ------------------------------------------------                                                               460, 750. 00
                                                             PUBIO WORKS FUNDS

Cost of new work to June 30, 1937--------------------------                                                                $1, 451, 380. 82
Cost of maintenance to June 30, 1937

      Total cost of permanent work to June 30, 1937------                                                                   1, 451, 380. 82
Minus accounts payable June 30, 1937 ____________--_____-                                                                           117.32
     Net total expenditures-------------------------------                                                                  1,    451, 263. 50
Unexpended balance June 30, 1937----------------------------                                                                       35, 206. 62
            Total amount appropriated to June 30, 1937____________                                                          1, 486, 470. 12

    Fiscal year ending June 30                           1933                  1934                 1935            1936               1937


Cost of new work _..                                                       $912, 321. 67         $351, 129. 34   $193, 766. 88       -$5, 837. 0
Cost of maintenance           1_,. .             . .     .      .     .      . ....         ..     . . .
Total expended- ---------......                                             738, 032. 95          530, 512. 36    183, 927.01         -1, 208. 82
Allotted--_...-----------------------                                     1, 500, 000. 00 ------------           -13, 529. 88

1Adjusted to classify bank protection work above the mouth of Cache Slouph as "New
Work" instead of "Maintenance" as shown in previous reports.
2 Exclusive of $814,500 appropriated during July 1937.
  SExclusive of available funds.
                                CALIFORNIA DEBRIS COMMISSION                                                                        1661
Balance unexpended July 1, 1936_ -_                                             _$33,                                              997.80
Gross amount expended_      __-_________---_-                                   -        $61,839.40
Less reimbursements collected---------                                            -__-___--63, 048. 22
                                                                                                                           -1,     208. 82

      Balance unexpended June 30, 1937                                         ----------------------                       35, 206. 62
Outstanding liabilities June 30, 1937_____---                                   ----------------                                117.32
         Balance available June 30, 1937 __----                                     ----------------                        35, 089. 30

       CONSOLIDATED           COST AND FINANCIAL SUMMARY                               FOR UNITED STATES FUNDS

Cost of new work to June 30, 1937___________----____                                                             1$16,107, 611.24
Cost of maintenance to June 30, 1937______---------_                                                                 1360, 004.40

      Total cost of permanent work to June 30, 1937 -------- _                                                       16, 467, 615. 64
Undistributed costs June 30, 1937_  __________-------____                                                                107, 537. 22

         Net total cost to June 30, 1937_                                                                            16, 575, 152. 86
Plus acounts receivable June 30, 1937 _________--_                                                                                 824. 85

          Gross total costs to June 30, 1937-----------                                               ____           16, 575, 977. 71
Minus accounts payable June 30, 1937__                                        -_________                    __              79, 521.06

     Net total expenditures__ ______  ______________16, 496, 456. 65
Unexpended balance June 30, 1137 ______________--
                                       ---     --- _    551, 005. 06
         Total amount appropriated to June 30, 1937____________                                                      17, 047, 461. 71

    Fiscal year ending June 30                       1933              1934                1935               1936                 1937


                  ..........
Cost of new work 1-                            $1 , 178, 914. 57 $1, 020, 962. 60     $769, 251. 34        $546, 035. 76         $815, 545. 15
Cost of maintenance 1-- ---- ..                       6, 704.87        7, 465. 27       12, 962. 24          58, 150. 20           50, 012. 00
       Total cost_ ---------------- 1, 185, 619. 44               1, 028, 427. 87      782, 213. 58         604, 185. 96          865, 557. 15

Total expended-....--------------                 976, 812. 07       878, 870. 21      774, 617. 02         549, 273. 24          952, 635. 54
Allotted.....          ...--------------------.1, 719, 418. 40    1, 482, 533. 15      305, 140.04          720, 470. 12


Balance unexpended July 1, 1936_                                                                        $1, 503, 640. 60
Gross amount expended ____                                                            $1, 581, 726. 78
Less reimbursements collected                                                              29, 091.24
                                                                                          6________________
                                                                                                            952, 635.54
          Balance unexpended June 30, 1937_____                                                                            551,005. 06
Outstanding liabilities June 30, 1937_________                                              $46, 796. 84I
Amount covered by uncompleted contracts ____                                                177, 959. 14
                                                                                                                           224, 755. 98

      Balance available June 30, 1937                                                                                      326,249. 08
Accounts receivable June 30, 1937________________________                                                                      824.85
         Unobligated balance available June 30, 1937_________                                                          2327, 073. 93
Amount (estimated)                     required to be appropriated for comple-
   tion of existing project 3____________________                                                                     2, 500, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1939:
                                3- -   -- -- -- --- -- -- --- -- --- -
      For new         work                                                           ---              --                   335, 750. 00
      For     maintenance 3-----------_                                                                                    125,000. 00

          Total 3                      ----,                                                                               460, 750. 00
   1 Adjusted to classify bank-protection work above the mouth of Cache Slough as "New
Work" instead of "Maintenance" as shown in previous reports.
   2 Exclusive of $814.500 appropriated during July 1937.
   3 Exclusive of available funds.
  1662             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                                      CONTRIBUTED             FUNDS

  Cost of new work to June 30, 1937 _--________________--                                                          $2, 403, 747. 17
  Cost of maintenance to June 30, 1937      ______                                                                      -------
             Total cost of permanent work to June 30, 1937----------                                                2,403, 747. 17

                        --------
  Net total expenditures___  _       --                   _______                   __------                        2,403, 747.17
  Unexpended balance June 30, 1937___--                              _--
                                                                     .            __. ______----___-                   76, 605. 74

             Total amount contributed to June 30, 1937 ----------------                                             2,480, 352. 91

      Fiscal year ending June 30                   1933                1934              1935              1936                1937


Cost of new work 1---_                        $258,627.00          $98, 542. 83     $353, 540. 72     $120,833.17          $622, 188. 89
Cost of maintenance 1                         -...

Total expended....----------------             258, 627. 00         98, 542. 83      353, 540. 72      120, 833. 17         622, 188. 89
Contributed....------------------              301, 660. 04        301, 295. 60      116, 448. 12      336, 693. 52         397, 127. 07


Balance unexpended July 1, 1936- -------------                                   $301, 667. 56
Amount contributed by State of California--------------------397, 127. 07
       Amount to be accounted for- __-__-                      -___________--- -    698, 794. 63
Gross amount expended ___           __         _______               __ -- _
                                                                    __-             622, 188. 89
       Balance unexpended June 30, 1937------------                                  76,605. 74
Amount covered by uncompleted contracts____         ---        -    -_____-         74, 996. 06
       Balance available June 30, 1937.---------------------                          1, 609. 68
Amount (estimated) required to be appropriated for completion
   of existing project_   ------------------------------------                   2, 583, 647. 09
Amount that can be profitably expended in fiscal year ending
   June 30, 1939 for new work___ ---------------------------------                  285, 750. 00

    CONSOLIDATED              COST AND FINANCIAL                   SUMMARY         FOR SACRAMENTO                RIVER,     CALIF.

                                                               _
Cost of new work to June 30, 1937 1- ---_-----_-------------                                                     $18, 511, 358. 41
Cost of maintenance to June 30, 1937 1----------------------                   360,004. 40
      Total cost of permanent work to June 30, 1937 ___---                18, 871, 362. 81
Undistributed costs June 30, 1937 -----------------------                      107, 537. 22
      Net total cost to June 30, 1937__--------------                     18, 978, 900. 03
Plus accounts receivable June 30, 1937_ ---------------------                         824. 85
      Gross total costs to June 30, 1937 ------------------                18, 979, 724. 88
Minus accounts payable June 30, 1937 __--.             ___-__-----               79, 521. 06
      Net total expenditures--___                         ----        -        900, 203. 82
                                                                           1---------
                                                                          18,
Unexpended balance June 30, 1937--------- ----                  -----   _      627, 610. 80
      Total amount appropriated and contributed to June 30,
               1937 2------------------19,                                                                             527, 814. 62

    Fiscal year ending June 30                    1933               1934               1935              1936               1937


Cost of new work 1- ---..............
                               $1,437, 541. 57 $1, 119, 505. 43 $1, 122, 792. 06                      $666, 868. 93     $1, 437, 734. 04
                                     6, 704. 87
Cost of maintenance 1---....----......               7, 465. 27      12, 962. 24                        58, 150. 20          50, 012. 00
       Total cost...--------------1,444, 246. 44               1, 126, 970. 70     1, 135, 754. 30     725, 019. 13       1,487, 746. 04

Total expended---............-----------..   1, 235, 439. 07       977, 413. 04    1, 128, 157. 74     670, 106. 41       1, 574, 824. 43

Allotted and contributed........             2, 021,078. 44    1, 7833828. 75        421, 588. 16    1, 057, 163. 64        397, 127. 07


   SAdjusted to classify bank protection work above the month of Cache Slough as "New
work" instead of "Maintenance" as shown in previous reports.
S Includes $200,000 voluntary contribution for bank protection.
                            CALIFORNIA DEBRIS COMMISSION                                                  1663
Balance unexpended July 1, 1936__ __-___-     _-----------                                     $1, 805, 308. 16
Amount contributed by State of California_---------------                                          397, 127. 07
      Amount to be accounted for____-__-                                                        2, 202, 435. 23
Gross amount expended_________________-     _ $2, 203, 915.67
Less reimbursements collected_---__-------__      629, 091. 24
                                                                                                1, 574, 824. 43

      Balance unexpended June 30, 1937-        _------------------                                   627, 610. 80
Outstanding liabilitia June 30, 1937                $46, 796. 84
Amount covered by uncompleted contracts_______      252, 955.20
                                                                                                     299, 752. 04

                                     --------
     Balance available June 30, 1937________                                                         327, 858. 76
Accounts receivable June 30, 1937-----------------------------                                            824. 85

      Unobligated balance available June 30, 1937                         ...---------               328, 683. 61
Amount (estimated) required to be appropriated for completion
of existing project 3 _  _        -------------------- __                                      5, 083, 647. 09
Amount that can be profitably expended in fiscal year ending
June 30, 1939:                                                                                      621, 500 00
   For new work 4                                                                                             .
   For maintenance 4           __________________________                                            125, 000. 00
       Total 4' -.- -   ----- --- ---- --- --- ---- -----   -- -- - - - - -       -- ---- --     -   746, 500. 00
       Total                                                                                         746,500.00
  a Exclusive of $814,500 appropriated during July 1937.
  4 Excusive of availabe funds.

4. SACRAMENTO RIVER AND TRIBUTARIES, CALIF. (DEBRIS CONTROL)

   Location.-The project reservoirs will be constructed in the water-
sheds of the Yuba, Bear, and American Rivers, Calif. (See U. S.
Geological Survey sheets for the basin areas, seven in number.)
   Existing project.-The project was designed to permit the resump-
tion of hydraulic mining on a substantial scale and provides for the
construction of four reservoirs at the following sites: (1) The Upper
Narrows on the Yuba River; (2) the North Fork site on the North
Fork of the American River; (3) the lower Ruck-A-Chucky site on
the Middle Fork of the American River; and (4) the Dog Bar site
on the Bear River. The estimated cost for new work made in 1935
is $6,945,000.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 50, 74th
Cong., 1st sess.). For latest published map see the project document.
   Local cooperation.-Satisfactoryassurances are to be furnished the
Secretary of War for repayment of the capital cost of the reservoirs
from taxes on material hydraulically mined, under licenses, and im-
pounded in these reservoirs. These have been furnished and accepted
for sites (1), (2), and (3) above.
   Terminal facilities.--None required.
   Operations and results duringq   scal year.-All new work, by hired
labor and Government or hired plant. Work preliminary to actual
construction was unfidr way at the Upper Narrows, North Fork, and
Ruck-a-Chucky Reservoir sites. Geological exploration by pits and
tunnels cost $37,297.08; construction of roads and trails cost $21,-
792.11; surveys cost $24,557.22; preparation of plans and specifica-
tions cost $3,237.28. Construction of a suspension bridge at the
Upper Narrows site cost $6,540.36; debris pressure tests cost $573.34.
       20196--87-pt. 1---105
1664       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Total cost of all activities was $93,997.39, and total expenditures
were $76,552.61.
   Condition at end of fiscal year.-Geological exploration is under
way at the North Fork, Ruck-a-Chucky, and Upper Narrows Reser-
voir sites, roads and trails have been built, and surveys made; and
a suspension bridge has been constructed at the Upper Narrows site.
Debris pressure tests have been made, and plans and specifications for
construction of dams at these three sites are being, prepared. Work
has been postponed on the Dog Bar site on Bear River, due to litiga-
tion involving the mining interests. The total cost of all activities
was $93,997.39 for new work, and the total expenditures were
$76,552.61.
   Proposed operations.-The balance unexpended July 1, 1937,
amounting to $23,447.39, including accounts receivable, together with
allotments of $1,504,000 made during July and August 1937, will be
applied during the fiscal year 1938 as follows:
Accounts payable---------------------- ------------------------                  $14, 060. 54

New work (during entire fiscal year) :
   Continuing preliminary work, by hired labor, including geol-
     ogical exploration, at the Upper Narrows, North Fork, and
     Ruck-a-Chucky Reservoir sites; also plans and specifications,
     surveys, roads, etc__ __---- __-------_---__---____                         117, 500. 00
   Beginning construction, by contracts, of a dam at the North
     Fork site on the North Fork of American River, and acquisi-
     tion of rights-of-way, to create a reservoir for the storage
     of hydraulic mining debris (total cost of reservoir, rights-
     of-way, etc., estimated at $825,000) _----__-___                            120, 000. 00
   Beginning construction, by contracts, of a dam at the Ruck-
     a-Chucky site on the Middle Fork of American River, and
     acquisition of rights-of way, to create a reservoir for the
     storage of hydraulic mining debris (total cost of reservoir,
     rights-of-way, etc., estimated at $690,000) ________117,                         000. 00
   Purchase of land for dam and reservoir sites, at Upper Nar-
     rows, North Fork, and Ruck-a-Chucky sites-----------------                   52,000. 00
        Total cost of new work_____-         ____________________                406, 500. 00

        Grand total--------------------------------------------420, 560. 54
    Balance available___---------------------------------------- 1,106, 886. 85
      Total-------------------------------------------------1, 527,447. 39
  The balance available July 1, 1938, amounting to $1,106,886.85,
together with an additional allotment of $4,300,000, can be profit-
ably expended or obligated during the fiscal year 1939 for new work,
as follows:
Completion of construction, by contracts of the dam at the North
  Fork site on the North Fork of American River, to create a
  reservoir for the storage of hydraulic mining debris----------- $705, 000. 00
Completion of construction, by contracts, of the dam at the
  Ruck-a-Chucky site on the Middle Fork of American River,
  to create a reservoir for the storage of hydraulic mining
debris ----------------------------------
debris   ._                        _                       -----------------      7000000.00
                                                                                  573,
Beginning construction by contracts, of a dam at the Upper
  Narrows site on Yuba River, and acquisition of rights-of-way,
  to create a reservoir for the storage of hydraulic mining debris
  (total cost of reservoir, rights-of-way, etc., estimated at
  $4,300,000)--------------------------------2,                                   000, 000. 00
        Total cost of new work---___,_-________--
                                               ..                      -    -_ 3, 278, 000. 00
Balance available                                         ______-__-_-___2, 128, 886. 85
        Total- ....       ..                  _-----_-___________              5,406.886.85
                              CALIFORNIA DEBRIS COMMISSION                                                     1665
                                       Cost and financial summary

Cost of new work to June 30, 1937______----------------            $93, 997.39
Cost of maintenance to June 30, 1937________-----------------      ----------
      Total cost of permanent work to June 30, 1937-------------     93, 997. 39
Undistributed costs June 30, 1937                                   -- 3,384.24
      Net total cost to June 30, 1937-----------------------         90, 613. 15
Minus accounts payable June 30, 1937----     --- -----------------   14,060. 54
      Net total expenditures-     ------------------------------- 76, 552. 61
Unexpended balance June 30, 1937----------------------------23 447.39
      Total amount appropriated to June 30, 1937,--------------100,000.00

          Fiscal year ending June 30              1933           1934          1935            1936            1937


Cost of new work-         - ----------------
Cost of maintenance ---------------------
                                               -----------   -------    ------------- -----------
                                                              --------------------------------
                                                                                                             $93, 997.39
                                                                                                            -- -- -
Total expended-                 ----------------
                                         .--------------------------------------------                        76, 552. 61
Allotted-------------                   ----
                                    ------     ------------ ------        ---------        ------------      10,000. 00


Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936---     --------------------------------                                         $100, 000. 00
Gross amount expended __________---------$76,556.12
Less reimbursements collected--_____------                3.51
                                                                                                           76, 552.61

      Balance unexpended June 30, 1937--__ ___                             ___--___--                      23,447.39
Outstanding liabilities June 30, 1937 _-____  __---
                                             ---                               ____-          _            22,384. 05
     Balance available June 30, 1937-____----------    ___1,                                                   063. 34
Amount allotted from War Department Civil Appropriation Act
approved July 19, 1937-------------------------------                                             1, 504, 000. 00

          Balance available for fiscal year 1938----------------1, 505, 063. 34

Amount (estimated) required to be appropriated for completion
of existing project 1- - _________-
                             - - - -
                                          ____      - -   -
                                                        ___ - - -
                                                                                                      5, 345, 000. 00
Amount that can be profitably expended in fiscal year ending
                                   - - - -- -
June 30, 1939 for new work 1___           ____  __
                                                __            __                                      4, 300, 000.00
   1   Exclusive of available funds.

        5. PLANT ALLOTMENT FOR CALIFORNIA DEBRIS COMMISSION
                                        Cost and financial summary
Undistributed costs to June 30, 1937-------------------------$472,                541.43
Plus or minus balance "Plant Rental", "Insurance and adjustment",
  etc., accounts, June 30, 1937      -___ ___---- -     _____-----
                                                              ___         -- 303,719.45
        Net total cost to June 30, 1937    __----.__        .---.-_______ 168, 821.98
Plus accounts receivable June 30, 1937_      ---__-____-__-             -____168,456.55
        Gross total costs to June 30, 1937___________---__________           337, 278. 53
Minus accounts payable June 30, 1937_--------------------------               26, 932. 51
        Net total expenditures_-------         ---------
                                                 _                           310, 346.02
Unexpended balance June 30, 1937_         ---------------------------- 9, 366.42
        Total amount appropriated to June 30, 1937-------------              319,712.44

          Fiscal year ending June 30               1933          1934           1935           1936            1937

                  --.....
Total expendedd- ...  _                                                  _1$215, 081. 70
                                                             ____...-----------             $89, 233. 08       $6,031. 24
Allotted-- .................-.........-                                     253, 712. 44 66, 000. 00 .__
1666              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936---....-..-- ----------------            -$15,                                                                  397. 66
Gross amount expended--------------------------              $519, 357. 69
Less-
        Reimbursements collected$--------                                           $506, 789. 79
        Receipts from sales----_-------i---                                            6, 536. 66
                                                                                                               513, 326. 45
                                                                                                                                           6, 031. 24

      Balance unexpended June 30, 1937 ...----     ..--- ------                                                                            9, 366. 42
Outstanding liabilities June 30, 1937--------------------------                                                                           39, 547. 83

      Balance available June 30, 1937-----                       -30, 181. 41
                                                            _--------------
Accounts receivable June 30, 1937   -------------------------- 168,456. 55

            Unobligated balance available June 30, 1937--------------                                                                    138, 275. 14

ADMINISTRATIVE                 EXPlENSES          IN CONNECTION WITH WORK BEING CARRIED OUT WITH
                                                   EMERGENCY RELIEF FUNDS

   An allotment of $1,000,000 from the Emergency Relief Appropri-
ation Act of 1935 was received on June 30, 1935, to be applied to
administrative expenses incurred in connection with work being car-
ried out with funds allotted from the above-mentioned appropriation.
There were no expenditures or obligations incurred during the fiscal
year 1935.
  The total expenditures made to June 30, 1937, were $735,869.64,
of which amount $730,364.63 was charged to new work and $5,505.01
charged to maintenance. The unexpended balance amounting to
$264,130.36 was revoked.
          ALLOTMENT FOR SURVEYS                                 AND INVESTIGATIONS--FLOOD                                      CONTROL

   An allotment of $2,454,194.81 from the "Emergency Relief Ap-
priation Act of June 22, 1936, assistance for educational, professional,
and clerical persons, 1936-37", was received during the fiscal year
ending June 30, 1937, for application to work on surveys, investiga-
tions, and preparation of plans in connection with flood-control proj-
ects authorized by the Flood Control Act approved June 22, 1936.
   The following table indicates the allotments, expenditures, and
unexpended balances from this appropriation by districts to June 30,
1937:

                                       District                                                 Allotted            Expended              Unexpended
                                                                                                                                            balance


Boston, Mass . -----            -..... --------------------                                         - $150, 000. 00     $133,528.55            $16, 471.45
Providence R. I ....-------------------------------------                                                 355, 000. 00   350, 845.81             4 154.19
First New York, N. Y_-____-..__.-.............                                                                 000.00
                                                                                                            40375,       280, 041.23            94; 958.77
Baltimore, Md -----------------------
                ...............                                                                           1300001,        30,000.  840
                                                                                                                              53. 00       -1,      46
Washington, D. C             -------------------------------------                                          50, 000.00    39,111.08             10, 888.92
Mobile, Alae__n............ ...........-----..-.                                       -
                                                                                  ..-- _12,            -        500. 00    1,426. 88            11, 073.12
Memphis, Tenn ----------..............                -.---.....-....-                                    232, 000. 00   195, 456. 22           36, 543. 78
Rock Island, Ill-__--------------------------------                                                       - 40, 500. 00   28, 532.88            11, 967.12
St. Paul, Minn------...              -----.. -----------------                                          - 16, 000.00      15, 535.84                464.16
Chicago, Ill                        ..................................------------------------------------------
                                                                                                            10, 000. 00    5, 699. 86            4, 300.14
                                                                 --------------------
Kansas City, Mo----......................------........------...............                                17, 500.00    17, 500. 00
Nashville, Tenn--.--------------------------------------                                                   18, 294.81     14,189.89            -4,104. 92
Pittsburgh, Pa---                                              ,---------------------------------------   751, 900. 00   720,415.16            31.484.84
Huntington, W. Va.-.........---------------------                                                     -     50, 000.00    35,147. 61           14, 852.39
Louisville, Ky        ----------------------------------------                                              70, 500. 00   64, 609.89            5,890.11
Seattle, Wash....--------.................----------------------............----------50,00.00                            49, 811. 88              188. 12
                      ...........................--------------........------........
Los Angeles Calif---------                                                                                125, 000.00    120, 375. 42           4, 624. 58
         Total..................................................                             2, 454,194.81         2. 202, 228. 20           251, 966. 61
                  MISSISSIPPI RIVER COMMISSION                   1667
             MISSISSIPPI RIVER COMMISSION
   Commission headquarters.-Vicksburg (Miss.) Office, Johnston
Circle, Vicksburg National Military Park. Address, P. O. Box 80.
   Commissioners.-The commissioners during the fiscal year were
Brig. Gen. H. B. Ferguson, Corps of Engineers, president; Edward
Flad, civil engineer; Col. Ernest Graves, United States Army, re-
tired; Leo O. Colbert, captain, United States Coast and Geodetic
Survey; Albert L. Culbertson; Harry N. Pharr, civil engineer; and
Col. F. B. Wilby, Corps of Engineers.
   The Mississippi River Commission. constituted by act of Congress
of June 28, 1879, is in charge of the improvements of the Mississippi
River from Head of Passes to the mouth of the Ohio River, including
the rectification of Red and Atchafalaya Rivers at their junction
with the Mississippi, the building of levees, and the improvement of
the several harbors for which specific appropriations have been made.
It was charged with the survey of the Mississippi River from Head
of Passes to its headwaters and with gaging the river and its tribu-
taries. Act of Congress approved March 4, 1913, provided funds
for levees from Cape Girardeau, Mo., to Rock Island, Ill., and acts
approved July 27, 1916, and March 1, 1917, provided for continua-
tion of levee work between those points and extended the juris-
diction of the Commission to include work on the Ohio. River fromn
its mouthto the mouth of the Cache River, and on the Arkansas River
from its mouth to its intersection with the division line between
Lincoln and Jefferson Counties, Ark. .By act of Congress approved
September 22, 1922, the jurisdiction of the Commission was extended
for purposes of levee and bank protection to the tributaries and out-
lets of the Mississippi River between Cairo, Ill., and Head of Passes,
and by act of Congress approved March 4, 1923, jurisdiction was
extended to include the tributaries and outlets of the Mississippi
between Rock Island, Ill., and Head of Passes, insofar as they may be
affected by the floodwaters of the Mississippi River. By the act of
May 15, 1928, the project authorized therein is to be prosecuted by
the Mississippi River Commission under the direction of the Secre-
tary of War and supervision of the Chief of Engineers and subject
to the provisions of that act.
   Location.-The Mississippi River rises at Lake Itasca, Minn. It
flows in a general southerly direction 2,434 miles, and empties into
the Gulf of Mexico. (See Mississippi River Commission maps and
charts.)
   Previous projects.-The original project contained in the report
of the Mississippi River Commission, dated February 17, 1880, con-
templated the permanent fixing and improvement of the channel to
a depth of at least 10 feet at the extreme low water by the contraction
of the low-water width to about 3,000 feet, the protection of the banks
against caving, and the control of the floodwater by means of
levees.
   Existing project.-The existing project is to maintain a channel
not less than 9 feet deep and not less than 300 feet wide from the
mouth of the Ohio River to Head of Passes, near the Gulf of Mexico,
1668      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

a distance of 1,070 miles,1 by open-channel work and by dredging;
to confine the river below Cairo to a permanent position by bank
revetment and contraction works; to maintain a navigable channel
between the waters of the Mississippi, Red, and Atchafalaya Rivers;
to control floodwaters from Rock Island to Head of Passes by levees;
and to make such surveys, examinations, and investigations of the
Mississippi River and its tributaries as may be deemed necessary
for the execution of the project. Specific provisions were made by
the River and Harbor Act of June 3, 1896, for constructing dredging
plant and maintaining for low-water navigation below Cairo a chan-
nel of 250 feet width and 9 feet depth at all periods of the year,
except when stopped by ice; by the act of June 4, 1906, for extending
the limits of levee construction from the mouth of the Ohio River
up to Cape Girardeau, Mo.; by the River and Harbor Act of July
27, 1916, for similar further extension of limits of levee construc-
tion from Cape Girardeau, Mo., up to Rock Island, Ill.; for the
extension of limits of construction of both levees and revetment up
the Arkansas River from its mouth to its intersection with the divi-
sion line between Lincoln and Jefferson Counties; and for the im-
provement of the Ohio River from its mouth to the mouth of Cache
River; and by the Flood Control Act of March 1, 1917, for the con-
struction of levees needed for flood control in addition to those
needed for navigation, in accordance with "plans of the Mississippi
River Commission heretofore or hereafter adopted, to be paid for
as appropriations may from time to time be made by law not to
exceed in the aggregate $45,000,000", subject to the provision that not
more than $10,000,000 shall be expended therefor during any one
fiscal year.
   The jurisdiction of the Commission was extended by the River and
Harbor Act approved September 22, 1922, for the purpose of levee
protection and bank protection to the tributaries and outlets of the
Mississippi River between Cairo, Ill., and Head of Passes, insofar
as these tributaries and outlets are affected by the floodwaters of
the Mississippi River. The act approved March 4, 1923 (Public,
No. 528, 67th Cong.), provides for continuing the improvement of
the, Mississippi River in accordance with the Flood Control Act
approved March 1, 1917, "and a sum not to exceed $10,000,000 annu-
ally is hereby authorized to be appropriated for that purpose for a
period of 6 years, beginning July 1, 1924", and also provides that
any funds which may hereafter be appropriated under authority of
this act, and which may be allotted to works of flood control, may
be expended upon any part of the Mississippi River between Head
of Passes and Rock Island, Ill., and upon the tributaries and outlets
of said river insofar as they may be affected by the floodwaters of
said river.
   The project was further modified by the Flood Control Act ap-
proved May 15, 1928, in accordance with the plan set forth in House
Document No. 90, Seventieth Congress, first session. This act author-
  1The River and Harbor Act of Jan. 21, 1927, adopted a project providing for a channel
35 feet deep at low water and 300 feet wide between Baton Rouge and New Orleans, La., a
distance of 132 miles (H. Doc. No. 105, 69th Cong., 1st sess.). This work is under the
jurisdiction of the first New Orleans engineer district.
                   MISSISSIPPI RIVER COMMISSION                   1669

ized the appropriation of $325,000,000 for the purpose of carrying
out the project recommended therein, which proposes to protect the
alluvial valley of the Mississippi, consisting of the St. Francis, the
Yazoo, the Tensas, and the Atchafalaya Basins, as well as the alluvial
lands around Lake Pontchartrain, from the maximum flood pre-
dicted as possible. This is to be done by raising existing levees
about 3 feet and strengthening them greatly and by permitting flood
waters in excess of what the leveed channel will safely carry to find
their way to the Gulf through the natural floodways in the lowlands
of the basins adjacent to the river, which lowlands have always car-
ried extraordinary floodwaters. Protecting levees are planned on
the edges of these natural floodways so as to restrain the waters
within them so far as practicable and to protect the good lands out-
side. These protecting levees are to be located so as to reclaim the
maximum amount of land that is economically justified, and where
there are already such levees (for example, in the Atchafalaya
Basin), the project contemplates using the same levees but strength-
ening them. The floodwaters will not escape into the floodways until
they have reached a dangerous stage in the main leveed channel.
This insures that the lands within the floodways will be subject to
overflow only during extraordinary floods. In general, the lands
within the floodways will be protected from all floods except those
extraordinary floods which occur on an average of only once in from
10 to 15 years. A limited area in the St. Francis Basin in southeast
Missouri, and the city of Cairo, Ill, is to be given additional safety
by a floodway between Birds Point and New Madrid, Mo., which
will, during extraordinary floods only, become an adjunct of the
main channel and thereby widen the river and hold down stages.
The city of News Orleans is to be given adequate protection by a
controlled spillway at Bonnet Carre emptying into Lake Pontchar-
train from the river above the city.
    The adopted- project also provides' for revetting to stabilize the
river channel and prevent excessive caving of banks; this, supple-
mented by contraction works and dredging, will insure a navigable
channel of not less than 300 feet wide and 9 feet deep.
    The flood-control act, in addition to the plan for control of floods
in the alluvial valley, made provision by section 6 for flood-control
work on the Mississippi River between Rock Island, Ill., and Cape
Girardeau, Mo. and on tributaries and outlets, insofar as they are
affected by backwater of the Mississippi; and by section 7 for an
emergency fund to be used in rescue work or in the repair or mainte-
nance of any flood-control work on any tributaries threatened or
destroyed by flood, including the flood of 1927; and for examinations,
surveys, and projects to be made as speedily as possible for flood
control on the tributary streams.
    Section 7 was amended by act approved June 19, 1930, providing
for reimbursement of levee districts or others for expenditures here-
tofore incurred or made in repair, etc., of flood-control works de-
stroyed, etc., by the flood of 1927 or subsequent flood or caving banks
on any tributaries or outlets of the Mississippi River.
    In accordance with section 7 of the act dated May 15, 1928, author-
izing appropriation of $5,000,000 for rescue work or in repair or
1670      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

maintenance of flood-control work on tributaries of the Mississippi
River, the sum of $5,000,000 has been appropriated as follows:
Deficiency Act approved May 29, 1928     ____------------------------- $1, 000, 000
War Department Appropriation Act approved Feb. 28, 1929     ---------      800, 000
War Department Appropriation Act approved May 28, 1930---------            400, 000
War Department Appropriation Act approved Feb. 23, 1931     ----------     400, 000
War Department Appropriation Act approved July 14, 1932---------           400, 000
War Department Appropriation Act approved Mar. 4, 1933     -----------     348, 000
War Department Appropriation Act approved Apr. 26, 1934     ---------      341, 291
War Department Appropriation Act approved Apr. 9, 1935 ---------           499, 400
War Department Appropriation Act approved May 15, 1936---------            811, 309
       Total ----------------------------------------------------        5, 000,000
  The project was further modified by the Flood Control Act ap-
proved June 15, 1936, which authorized the appropriation of $272,-
000.000 additional for work on the modified project, in accordance
with plan set forth in Committee on Flood Control, House of Rep-
resentatives, Document No. 1, Seventy-fourth Congress, first session.
The above act is printed in the annual report of the Mississippi River
Commission for 1936, pages 1679-1683.
  In addition to providing for the continuation of work previously
authorized the principal features of the modification include flood
control of the St. Francis River, Mo. and Ark.; an emergency reser-
voir at mouth of White River, Ark.; construction of the Eudora flood-
way, Arkansas and Louisiana, in lieu of the Boeuf floodway, Arkansas
and Louisiana; flood control of the Yazoo River, Miss.; construction
of the Morganza floodway, Louisiana; construction of an outlet to
the Gulf of Mexico, west of Berwick, La.; the United States to pro-
vide drainage made necessary by the construction of floodways; the
construction of roads on levees; and purchase of flowage rights in
Eudora, Morganza, and West Atchafalaya floodways.
   Section 9 of the act approved June 15, 1936, reads as follows:
   The sum of $15,000,000 is authorized to be appropriated as an emergency fund
to be allocated by the Secretary of War on the recommendation of the Chief
of Engineers in rescue work or in the repair or maintenance of any flood-control
work on any tributary of the Mississippi River threatened or destroyed by flood
heretofore or hereafter occurring: Provided, That the unexpended and unal-
lotted balance of said sum or so much thereof as may be necessary may be
allotted by the Secretary of War, on the recommendation of the Chief of Engi-
neers, in the reimbursement of levee districts or others for expenditures here-
tofore incurred or made for the construction, repair, or maintenance of any
flood-control work on any tributaries or outlets of the Mississippi River that
may be threatened, impaired, or destroyed by the flood of 1927 or subsequent
flood; and also in the construction, repair, or maintenance, and in the reim-
bursement of levee districts or others for the construction, repair, or mainte-
nance of any flood-control work on any of the tributaries or outlets of the Mis-
sissippi River that may have been impaired, damaged, or destroyed by caving
banks or that may be threatened or impaired by caving banks, of such tribu-
taries, whether or not such caving has taken place during a flood stage: Pro-
vided further, That if the Chief of Engineers finds that it has been or will be
necessary or advisable to change the location of any such flood-control work in
order to provide the protection contemplated by this section, such change may
be approved and authorized.
   The War Department Civil Appropriation Act approved July 19,
1937, appropriated $300,000 for work under this authorization.
   Recommended modifications of poject.-Under date of January
28, 1931, a report was transmitted to Congress recommending certain
flood-control works at the city of Hickman, Ky. (H. Doc. No. 729,
71st Cong., 3d sess.). Included in Public Works program.
                      MISSISSIPPI RIVER COMMISSION                          1671
   Under date of March 4, 1931, a report was transmitted to Con-
gress on a review of existing projects for flood control and naviga-
tion of the Mississippi River in its alluvial valley, as shown by Public
Document No. 391, Seventieth Congress (H. Doc. No. 798, 71st Cong.,
3d sess.).
   Under date of December 16, 1931, a report was transmitted to Con-
gress on the Mississippi River below Cape Girardeau, Mo., made in
compliance with section 11 of the Flood Control Act of May 15, 1928
 (H. Doc. No. 188, 72d Cong., 1st sess.).
   Pursuant to a resolution of the House Committee on Flood Control,
dated January 28, 1932, a supplemental report, dated February 12,
1935, was transmitted to the Committee on Flood Control, House of
Representatives, recommending certain extensions and modifications
of the projects for flood control of the Mississippi River and its
tributaries set forth in House Document 90, Seventieth Congress,
first session, as adopted by the Flood Control Act of May 15, 1928
 (Committee on Flood Control, House of Representatives, Doc. No. 1,
74th Cong., 1st sess.). Included in act approved June 15, 1936.
   Under date of July 29, 1935, a report was transmitted to Congress
on further flood control of the lower Mississippi River, which may be
obtained through the control of floodwaters in the drainage basins
of the tributaries by the establishment of a reservoir system, made
in accordance with the provisions of section 10 of the Flood Control
Act approved May 15, 1928 (H. Doc. No. 259, 74th Cong., 1st sess.).
   Under date of April 28, 1937, a report was transmitted to Congress
on comprehensive flood-control plan for Ohio and lower Mississippi
Rivers (Committee on Flood Control, House of Representatives,
Com. Doc. No. 1, 75th Cong., 1st sess.).
   References to published articles not previously reported.-Engi-
neering News-Record issues of February 4, 11, and 18, 1937; Monthly
Weather Review, February 1937; Military Engineer, May-June 1937;
Civil Engineering, May-June 1937; and National Geographic, June
1937.
   Local cooperation.-The Flood Control Act approved May 15,
1928, provides as follows:
   Section 2 provides that no local contribution to the project therein
adopted is required.
   Section 3 reads in part as follows:
   Except when authorized by the Secretary of War upon the recommendation
of the Chief of Engineers, no money appropriated under authority of this act
shall be expended on the construction of any item of the project until the States
or levee districts have given assurances satisfactory to the Secretary of War
that they will (a) maintain all flood-control works after their completion, ex-
cept controlling and regulating spillway structures, including special relief
levees; maintenance includes normally such matters as cutting grass, removal
of weeds, local drainage, and minor repairs of main river levees; (b) agree to
accept land turned over to them under the provisions of section 4; (c) provide
without cost to the United States all rights-of-way for levee foundations and
leeves on the main stem of the Mississippi River between Cape Girardeau, Mo.,
and the Head of Passes.
  Section 6 provides as follows:
  Funds appropriated under authority of section 1 of the act may be expended
for the prosecution of such works for the control of the floods of the Mississippi
River as have heretofore been authorized and are not included in the present
project, including levee work on the Mississippi River between Rock Island, Ill.,
1672       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

and Cape Girardeau, Mo., and on the outlets and tributaries of the Mississippi
River between Rock Island and Head of Passes insofar as such outlets or
tributaries are affected by the backwaters of the Mississippi: Provided, That
for such work on the Mississippi River between Rock Island, Ill., and Cape
Girardeau, Mo., and on such tributaries, the States or levee districts shall
provide rights-of-way without cost to the United States, contribute 333 percent
of the costs of the works, and maintain them after completion: And provided
further, That not more than $10,000,000 of the sums authorized in section 1 of
this act shall be expended under the provisions of this section.
   The act approved April 23, 1934 (Pub. No. 171, 73d Cong.), pro-
vides as follows:
  * * * That the Secretary of War is authorized, out of any money avail-
able for carrying out the provisions of the act entitled "An act for the control
of floods on the Mississippi River and its tributaries, and for other purposes",
approved May 15, 1928, to purchase from, or to reimburse States or local levee
districts for the cost of, any levee rights-of-way or easements for the building
of levees in the Mississippi Valley for which the United States was or is under
obligation to pay under the provisions of the act of May 15, 1928, regardless
of whether said States or local levee districts have furnished such rights-of-way
in the past and regardless of the conditions under which such levee rights-of-
way were furnished, or may be furnished in the future: Provided, That after
careful investigation the prices are found to be reasonable: And provided
further, That payments or reimbursements for levee rights-of-way or easements
conveying the privilege of building levees may be made as soon as they have
been acquired in conformity with local custom or legal procedure in such
matters and to the satisfaction of the Chief of Engineers.
  The requirements of the above provisions as to local cooperation
have been and are being fully complied with.
  The act approved June 15, 1936 (Public, No. 678, 74th Cong.),
provides as follows:
   SEC. 4. That neither of the projects for the flood control of the Saint Francis
River or the Yazoo River,' hereby authorized, shall be undertaken until the
States, or other qualified agencies, shall have furnished satisfactory assur-
ances that they will undertake, without cost to the United States, all altera-
tions of highways made necessary because of the construction of the author-
ized reservoirs, and meet all damages because of such highway alterations, and
have agreed also to furnish without cost to; the United States all lands and
easements necessary to the construction of levees and drainage ditches con-
structed under this project: Provided, That the reservoirs for control of head-
water flow of the Yazoo River system may be located by the Chief of Engineers,
in his discretion: And provided further, That the Chief of Engineers may, in
his discretion, substitute levees, floodways, or auxiliary channels, or any or
all of them, for any or all of the seven detention reservoirs recommended in
his report of February 12, 1935, for the control of floods of the Yazoo River:
And provided further, That the Chief of Engineers, with the approval of the
Secretary of War, may modify the project for the flood control of the Saint
Francis River as recommended in said report, to include therein the construc-
tion of a detention reservoir for the reduction of floods, and the acquisition at
the cost of the United States of all lands and flowage necessary to the con-
struction of said reservoir except flowage of highways: Provided further, That
the estimated cost to the United States of the project is not increased by reason
of such detention reservoir.
   SE. 5. The Chief of Engineers, under the supervision of the Secretary of
War, shall at the expense of the United States Government construct a system
of levees substantially in accordance with general plan shown on map desig-
nated as sheet numbered 1 entitled "Tributary Levee Location Survey-White
River Levee District-Proposed Levee Location" accompanying report dated
April 2, 1925, and filed in office of First and Second Mississippi River Com-
mission Districts, Memphis, Tennessee. The Chief of Engineers shall have the

   1 See Sec. 6 of act approved Aug. 28, 1937 (Public No. 406) for modified provisions
affecting the Yazoo River project.
                           MISSISSIPPI RIVER COMMISSION                          1673
right to alter, change, or modify said plan as to the grades and levee sections:
Provided, however, That no work shall be commenced on the above-mentioned
project until the State, levee boards, or other responsible local interests have
given assurances satisfactory to the Secretary of War that they will (a)
provide without cost to the United States all rights-of-way necessary for the
construction of said project; (b) provide drainage facilities made necessary by
construction of levees; (c) acquire and provide without cost to the United
States all flowage and storage rights and easements over, upon, and across
the lands and properties within the' protected area in the event it becomes
necessary in the judgment and discretion of the Secretary of War or the Chief
of Engineers to use said area, or any part thereof, for an emergency reservoir;
 (d) hold and save the United States free from liability for damages on account
of the use of said area for reservoir purposes during said emergency.
   SEC. 8a. That no money appropriated under authority of this act shall be
expended on the construction of any reservoir project herein authorized until
States, political subdivisions thereof, or other responsible local agencies have
given assurance satisfactory to the Secretary of War that they will (a) pro-
vide without cost to the United States all lands, easements, and rights-of-way
necessary for the construction of the project, except as otherwise provided
herein; (b) hold and save the United States free from damages due to the con-
struction works; (c) maintain and operate all the works after completion in
accordance with regulations prescribed by the Secretary of War: And provided,
That the construction of any dam authorized herein may be undertaken without
delay whenl the dam site has been acquired and the assurances prescribed
herein have been furnished, without awaiting the acquisition of the easements
and rights-of-way required for the reservoir area: And provided further, That
whenever expenditures for lands, easements, and rights-of-way by States, po-
litical subdivisions thereof, or responsible local agencies for any individual
project or useful part thereof shall have exceeded the present estimated con-
struction cost therefor, the local agency concerned may be reimbursed one-half
of its excess expenditures over said estimated construction cost: And provided
further, That when benefits of any project or useful part thereof accrue to
lands and property outside of the State in which said project or part thereof
is located, the Secretary of War may acquire the necessary lands, eastments,
and rights-of-way for said project or part thereof after he has received from
the States, political subdivisions thereof, or responsible local agencies benefited
the present estimated cost of said lands, easements, and rights-of-way, less
one-half the amount by which the estimated cost of these lands, easements, and
rights-of-way exceeds the estimated construction cost corresponding thereto:
And provided further, That the Secretary of War shall determine the proportion
of the present estimated cost of said lands, easements, and rights-of-way that
each State, political subdivision thereof, or responsible local agency should
contribute in consideration for the benefits to be received by such agencies:
And provided further, That whenever not less than 75 per centum of the benefits
as estimated by the Secretary of War of any project or useful part thereof
accrue to lands and property outside of the State in which said project or part
thereof is located, provision (c) of this section shall not apply thereto; nothing
herein shall impair or abridge the powers now existing in the Department of
War with respect to navigable streams: And provided further, That nothing
herein shall be construed to interfere with the completion of any reservoir or
flood control work authorized by the Congress and now under way.
   Terminal facilities.-See Port Series No. 5, Port of New Orleans,
La., 1924 (revised 1932); Transportation Series, Report No. 2, 1929,
Transportation in the Mississippi and Ohio Valleys; and Transpor-
tation Series, Report No. 4, 1936, Transportation Lines on the Missis-
sippi River System.
   Operations and results during fiscal year.-Sessions of the Missis-
sippi River Commission: The two hundred and ninth session of the
Commission (Nov. 5-12, 1936) was held on the steamer Mississippi
from Cairo, Ill. (0.0) to New Orleans, La. (967),2 via Mississippi
  2 Figures   in parentheses denote distance in miles below Cairo, Ill., gage.
1674    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

River with inspection of works in the Atchafalaya Basin from
Simmesport, La. (5 miles below head of Atchafalaya River), to Plaq-
uemine, La. (863), via Atchafalaya River and Bayou Plaquemine
made on board the steamer General John Newton; the two hundred
and tenth session (Apr. 29-May 7, 1937) was held on the steamer
Mississippi from Cairo, Ill. (0.0) to the Head of the Passes, La.
 (1,070), 103 miles below New Orleans, La., via Mississippi River with
inspection of works in the Atchafalaya Basin between Raccourci
Landing, La. (785), and Krotz Springs, La. (42 miles below head
of Atchafalaya River), by automobile, thence by the steamer General
John Newton to Plaquemine, La. (863), via Atchafalaya River and
Bayou Plaquemine. Public hearings were given to representatives
of navigation, levee, commercial, and other interests at these sessions.
    Surveys, gages, and observations.-Gages were maintained and dis-
charge and slope observations made. Surveys were made over im-
portant works and along caving banks. Information was collected
on the damage occasioned by the 1937 flood. Floodway, levee repair,
and setback, revetment, dike, hydrographic, aerial, precise level, and
construction surveys were also made. Observations and surveys were
made in connection with the progress of cut-offs and channel rectifi-
cation and stabilization on the Mississippi River and Atchafalaya
Basin. Publication of the map of the alluvial valley lower Missis-
sippi River, scale 1: 62,500 was continued.
   Bank protection and regulation.-Below Cairo, 9,906 linear feet
 (1.9 miles) of new revetment was constructed and placed for bank
protection; in addition about 1,882,910 square feet of concrete mat-
tress, 94,100 square feet of riprap, 3,505,937 square feet of asphalt
revetment, and 1,153,628 square feet of stone paving were constructed
and placed as repairs to and renewals of existing bank-protection
work. Under the contraction works program, Mississippi River,
38,150 linear feet of sand dikes were constructed; minor maintenance
work was carried on in connection with existing contraction works.
   Levees.-A total of 37,294,994 cubic yards of material was placed
in levees during the fiscal year, of which 35,302,959 cubic yards were
placed under section 1 on the main river; 1,128,100 cubic yards under
section 6 on the upper Mississippi or on tributaries; and 863,935 cubic
yards under sections 6 and 7 (repairs of flood damage) of the act of
May 15, 1928. In addition, 412,518 cubic yards of material were
placed in levees in the Memphis district with Emergency Relief Act
funds (221,993 cubic yards at Clarendon, Ark., on White River, and
466 cubic yards at Arkansas City, Kans., and 190,059 cubic yards at
Tulsa, Okla., on Arkansas River, the yardage placed at the latter two
places is reported in the annual report of the Memphis district, river
and harbor work). In the second New Orleans district 23,484 linear
feet of asphalt wave-wash protection was placed below New Orleans
on new and old levees.
   Floodways and spillways.-The Birds Point-New Madrid set back
levee has been completed with the exception of the final closure of
the short gap where the Missouri Pacific Railroad crosses the levee
at Samos, Mo., which was temporarily closed with sand bags during
the 1937 flood; the intercepting drainage ditch and appurtenant struc-
tures have been completed; flowage rights have been secured on 81.6
                   MISSISSIPPI RIVER COMMISSION                   1675
percent of the lands in the floodway; the fuse-plug levees have not
been de-graded to project grade; the 1937 flood caused the operation
of the floodway which, at the crest stage, carried approximately one-
fourth of the flood discharge; crevasses which occurred in the river
front levee were repaired sufficiently to hold headwaters from the
May rise out of the floodway except in the extreme south part; final
repairs are under way or completed on all crevasses above the lower
fuse-plug section except two, which are being deferred pending suit-
able pit conditions, all repair work is expected to be completed during
the present working season. Concrete levee walls along the banks of
Ouachita River in Monroe and West Monroe, La., were practically
completed; protection levees for Monroe, West Monroe, and north to
Bastrop, La., were completed. Construction of the Eudora floodway,
Arkansas and Louisiana was authorized by act approved June 15,
1936, in lieu of the Boeuf floodway, Arkansas and Louisiana. Plans
and estimates for the Eudora floodway through Bayou Macon Basin
were continued during the fiscal year; aerial photographic surveys
were made of the area in Louisiana; right-of-way and ownership
surveys were made of the area in Arkansas and Louisiana; prepara-
tion of tract maps, appraisal by the Department of Agriculture and
Forestry Service, and taking of options were begun in the area in
Arkansas and Louisiana. The construction of the Bonnet Carre
spillway structure was brought to completion on February 10, 1931;
both the upper and lower guide levees were complet& to final grade
in the late summer of 1932, except for gaps at highway and railroad
crossings; during the fiscal year ending June 30, 1936, all crossings
were completed and the front levee de-graded; on December 13, 1935,
the Bonnet Carre spillway was formally dedicated with impressive
ceremonies; it was first placed in operation during the 1937 flood sea-
son; gradual opening of the bays was begun on January 28, 1937,
and was continued until February 18, 1937, at which time 285 of the
350 bays were opened to flood waters; a maximum flow of approxi-
mately 211,000 cubic feet per second was recorded on February 25,
1937, with 285 bays in operation; gradual closing was begun on
March 7, 1937, and completed on March 16, 1937; maximum discharge,
with all bays in operation, as contemplated in the act of May 15, 1928,
is 250,000 cubic feet per second. Studies of the Atchafalaya Basin
were continued; dredging operations were carried on throughout the
year to develop a main channel from Alabama Bayou to Grand Lake
to improve the discharge of floodwaters; with the exception of high-
way, railroad, and drainage and navigation gaps, the east and west
Atchafalaya Basin protection levees furnish protection on the west
side from Hamburg, La., to Charenton, La.; interim protection is
furnished from a few miles below Charenton to Verdunville Canal
near Patterson, La.; on the east side protection is furnished from
Morganza, La., to Morgan City, La.; an emergency protection levee
to interim grade was built around Simmesport, La.
   Dredging operations-Channel--Mlaintenance dredging.-During
the dredging season of 1936, ending June 30, 1937, in the Memphis
district, seven dredges and one sand and gravel dredge were operated
on the Mississippi River on 53 crossings from Williams to Sibley
Chute, 27 to 388 miles below Cairo, and a total of 31,069,025 cubic
1676       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

yards of material were moved; in the Vicksburg district, one pump
barge was operated at Caulk Point (413),2 moving 605,351 cubic
yards, one pump barge was operated at O'Bannon Point (430), mov-
ing 149,270 cubic yards, one pump barge was operated at Refuge
 (495) moving 304,534 cubic yards, and one pump barge was operated
at Princeton (515), moving 89,891 cubic yards; in the second New
Orleans district no channel-maintenance dredging was done during
the fiscal year 1937. With the exception of the dredging at Caulk
Point, O'Bannon Point, Refuge, and Princeton, no other channel-
maintenance dredging was required in the Vicksburg or second New
Orleans districts on Mississippi River.
   Harbor dredging.-Dredging was also done in Memphis Harbor
 (227) and Wolf River, moving 255,236 cubic yards of material.
 (This work is reported in the annual report of the Memphis district,
river and harbor work.) In the Vicksburg district two pump barges,
one dust pan dredge, and one cutterhead dredge were operated at
Greenville Harbor (483), moving 1,454,738 cubic yards; and one
pump barge was operated at the Yazoo Diversion Canal (Vicksburg
Harbor,) moving 22,114 cubic yards.
   Corrective, channel improvement, and miscellaneous dredging Mis-
sissippi River.-Memphis district, 10,583,077 cubic yards, which in-
cludes 517,314 cubic yards dredged and placed in connection with
b'iilding sand dikes and 1,300,276 cubic yards dredged and placed
for levee restoration; Vicksburg district, 10,795,967 cubic yards, which
includes 2,460,384 cubic yards dredged and placed in connection with
building sand dikes and 488,566 cubic yards by agitation dredging
in improving channel; and in the second New Orleans district, 26,-
742,589 cubic yards were dredged in corrective dredging and 16,846,456
cubic yards of material were dredged and placed in connection with
building sand dikes.
   Dredging in connection with cut-offs.-Dredging and excavation
work for the purpose of realining the river and assisting in lowering
flood heights by cut-offs was done at seven points on the Mississippi
River, with yardage shown moved during fiscal year 1937, i. e., in
the Vicksburg district at four points, using three cutterhead dredges
and two pump barges: Caulk cut-off (406-422),2 1,506,610 cubic
yards by cutterhead dredges and 49,437 cubic yards by one levee
machine (not included in dredge totals), work began April 21, 1937,
cut-off opened May 13, 1937; Worthington cut-off (506-513), 1,055,-
223 cubic yards, cut-off opened December 25, 1933; Sarah cut-off (518-
536), 3,771,268 cubic yards, cut-off opened March 23, 1936; Willow
cut-off (564-578), 650,000 cubic yards, cut-off opened April 8, 1934
 (no dredging was required at Ashbrook cut-off (444-456), opened
November 19, 1935; Tarpley cut-off (461-472), opened April 21,
1935; Leland cut-off (472-483), opened by natural erosion July 8,
1933; and Marshall cut-off (587-593), opened March 12, 1934; in the
second New Orleans district at three points, using two cutterhead
dredges, one pump barge, and two agitator dredges; Rodney cut-off
 (664-672) was begun July 8, 1935, and opened February 29, 1936,
653,845 cubic yards, after the 1937 high water the cut-off provided
 . s Figures in parentheses denote distance in miles below Cairo, Ill., gage.
                       MISSISSIPPI RIVER COMMISSION                               1677
a mean low water channel 25 feet deep, the channel is carrying 37
percent of the river discharge at a medium stage; Glasscock cut-off
 (722-737) was begun in January 1933, opened March 26, 1933, and
enlarged each following year, 1,706,199 cubic yards, a mean low
water channel at least 30 feet deep existed on June 30, 1937, at a
medium stage the cut-off is carrying 24 percent of the river discharge;
Giles cut-off (690-704) was opened to high water May 25, 1933, and
opened to low water October 6, 1934, 1,014,672 cubic yards, at a
medium stage the channel is carrying 55 percent of the river dis-
charge; Diamond cut-off (614-626) was opened January 8, 1933, no
dredging required during 1937 fiscal year, at a medium stage the
channel is carrying 65 percent of the river discharge; Yucatan cut-off
  (638-648), which occurred in the fall of 1929 when the Mississippi
River eroded the river bank and connected with the Big Black River,
no dredging required during 1937 fiscal year, on June 30, 1937, at a
medium stage Yucatan carried approximately 100 percent of the
river discharge.
    Atchafalaya Basin--Second :New Orleans district.-Operations
were continued in the Atchafalaya Basin to produce a continuous
main channel through the basin from Atchafalaya River (at Alabama
Bayou) into Grand Lake. Also the Atchafalaya River between Mel-
ville and Simmesport, La., was dredged in constricted reaches. Eight
pipe-line dredges were engaged at the following locations: Whiskey
B ay Pilot Channel (57) 3 commenced November 8, 1934, was com-
pleted April 13, 1936, the enlargement of this channel was begun
January 7, 1937, and completed May 18, 1937, 2,418,545 cubic yards
of material were dredged in the 1937 fiscal year; Whiskey Bay Pilot
extension (60),3 commenced April 27, 1935, and completed January
6, 1937, 2,550,262 cubic yards of material             -were
                                                   dredged during the
1937 fiscal year; Blind Tensas cut (70.7) 3 was: opened March 30,
1935, enlargement of this channel was begun November 2, 1936, and
on June 30, 1937, was 50 percenit complete, 766,245 cubic yards of
material were moved in the 1937 fiscal year; Bayou Chene-Tarleton
I~ayou cut (77.2), 3 began January 21, 1933, and completed April 16,
1935, enlargement started April 28, 1936, and was approximately
60 percent complete June 30, 1937, 4,651,980 cubic yards of material
were dredged during the 1937 fiscal year; Chicot Pass Channel (81)a
was begun December 5, 1935, and completed July 24, 1936, the en-
largement of this channel was begun September 24, 1936, and com-
pleted April 10, 1937, 10,426,829 cubic yards of material were dredged
during the fiscal year; Grand Lake Channel (93)3 ( a continuation
of Chicot Pass Channel into Grand Lake) was begun February 1,
1937, 1,853,210 cubic yards of material were dredged- during the 1937
fiscal year, the project was approximately 85 percent complete on
June 30, 1937; Simmesport to Melville Atchafalaya River Channel
improvement (5-33),' was begun September 18, 1936, and completed
January 9, 1937, 2,607,390 cubic yards of material were dredged.
    Waterways Experiment Station.-Ten experiments were under-
taken in the hydraulic laboratory for the Mississippi River Commis-
  3 Distance in miles below head of Atchafalaya River, through main channel, Atchafalaya
Basin.
1678      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

sion and Lower Mississippi Valley Division. These experiments con-
cerned problems as follows: Determination of the effects of various
cut-offs, determination of the effects of improvements in the Atchaf-
alaya Basin, determination of the effects of corrective dredging in
the Mississippi River and its tributaries, determination of the effects
of the White River emergency reservoir, studies relative to the place-
ment and location of contraction works, determination of the effects
of rifling in the discharge lines of dredges, and studies relative to the
design of spillways and auxiliary works of dams. The soil mechanics
laboratory conducted several studies for the Mississippi River Com-
mission and the Lower Mississippi Valley Division. These studies
included sediment surveys, tests of soils and rocks, and determina-
tion of the efficacy of sublevees and their effects in controlling seepage
through and under the levees. In the hydraulic laboratory 13 studies
were undertaken for engineer districts and other governmental de-
partments outside the Lower Mississippi Valley Division. These
studies were distributed as follows: St. Louis district, 4; Missouri
River division, 1; Los Angeles district, 1; San Francisco district, 1;
Louisville district, 1; Mineral Wells district, 1; First New York
district, 2; St. Paul district, 1; Cincinnati district, 1. One experi-
ment was undertaken for a nongovernmental agency. These 14 ex-
periments involved such problems, as studies of methods of channel
improvement, determination of effects of jetties, study of flood con
trol problems, studies involving tidal phenomena, and studies of
backwater and silting effects of navigation dams. The soil mechanics
laboratory conducted studies for the Lower Mississippi Valley Divi-
sion, and also for districts outside the Lower Mississippi Valley Divi-
sion. These studies involved problems as follows: Analyses of sedi-
ment and sand samples, determination of the properties of borrow-
pit materials, the development of designs for earth dikes, investiga-
tion of the characteristics of foundation materials, and investigation
of the characteristics of hydraulic fill materials. The soil mechanics
laboratory also conducted studies for the Resettlement Administra-
tion, the Works Progress Administration, and the National Park
Service.
   High water of 1937.--In January 1937 heavy rains, over the middle
and lower Ohio River Basin, caused a record flood on that stream.
with a maximum (Ohio) discharge of about 1,850,000 cubic feet per
second at Cairo. Although the Mississippi River above Cairo added
relatively little to this discharge, yet its contribution of about 164,000
cubic feet per second brought the total to something over 2,000,000
cubic feet per second and record stages were experienced at all stations
from Cairo, Ill (0.0) to Helena, Ark. (307),2 with crests of 59.51 feet
at Cairo, 50.4 feet at Memphis, Tenn. (227), and 60.21 feet at Helena,
Ark. (307), exceeding the previous record highs of both 1913 and 1927.
High stages prevailed throughout the St. Francis and White back-
water areas. An early flood on the White River had passed out of the
way before the arrival of the Ohio crest. The Arkansas River was rel-
s Figures in parentheses denote distance in miles below Cairo, Ill., gage.
                        MISSISSIPPI RIVER COMMISSION                           1679
atively low. On the Mississippi River, the Birds Point-New Madrid
floodway was placed in operation by blasting the front line levee when
a stage of about 58.4 feet on the Cairo gage was reached, after natural
crevasses had started in the vicinity of Crosno, Mo. (17) and Copp
Cypress. Low sections of levee throughout the Memphis district were
topped with sand bags and bulkheading, and no breaks occurred in the
main levees. The Memphis district furnished materials, supplies and
supervision for the flood fight, and the Works Progress Administration
and Civilian Conservation Corps furnished much of the labor. Evac-
nation of flood areas in Arkansas was under the direction of National
Guard units. The United States Coast Guard Service assisted in res-
cue work and the American Red Cross furnished food, shelter, cloth-
ing, and medical supplies to the refugees. In the Vicksburg district the
crest at Arkansas City, Ark. (438) was 6.54 feet below 1927 and 5 feet
below 1929, at Greenville, Miss. (480)2, 2.35 feet below 1927 and 1 foot
below 1929, and at Vicksburg, Miss. (602), 2.9 feet below 1927 and 0.3
foot above 1929. This was due to the stage lowering effects of cut-offs
and low stages on the Arkansas and White Rivers. Levees were not
threatened at any point in the district. A small amount of topping
was done to increase freeboard. As a result, minimum freeboard in
the district was 6 feet at the crest of the flood ranging up to 12 feet
throughout a considerable part of the district. In the second New Or-
leans district the high water of 1937 is of particular interest, partly
because it reached the highest stage ever recorded at Natchez, Miss.
 (706), but principally because it furnished the first major test and op-
portunity for study of effectiveness of the new levees of the 1928 grade
and section, to the practically completed program of corrective dredg-
ing and cut-offs and the use of the Bonnet Carr spillway and flood-
way. The high-water fight started in the latter part of January and
continued until the middle of March 1937, the most active period being
the last half of February. The local levee board cooperated with the
district personnel at all times in the prosecution of the fight. Material
and equipment were placed in easily accessible places adjacent to vul-
nerable spots. Plant movements were coordinated by district head.
quarters. The district cooperated with the Red Cross in removing
stranded people and livestock. The principal activities of the high
water fight consisted in topping main line levees on the Mississippi
River not yet brought up to the 1928 grade and section, levee raising
and closing of gaps in the Atchafalaya Basin, construction of wooden
revetments and placing of sacks for protection against wave-wash,
blanketing with dirt to stop excessive seepage, treatment of sand boils.
and protection of exposed points from scour due to excessive current
velocities. No crevasses occurred in this district.
    A second wave with moderately high stages occurred on the Missis-
sippi River in May 1937, with crests of 48.6 feet at Cairo and 35.6 feet
at Memphis; all tributaries were at relatively low stages.
  2 Figures in parentheses denote distance in miles below Cairo, Ill., gage.

       20196---37--pt. 1-106
1680                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

         Cost and expenditures during the year, exclusive of receiptsfrom sales, etc.

                                                                                        Costs                                                      Net expenditures


                                                                         New work            Maintenance                                         New work             Mainte-
                                                                                                                                                                      nance
                   _             _                                       Ne.....

           UNITED STATES FUNDS (REGULAR)

New project:
   Tributary levees and above Cairo (sec. 6,
     Flood Control Act approved May 15, 1928):
        St. Louis district_______........................                       $48, 822. 76                          $45, 490. 06
        Vicksburg district--___                                                  39,136.29 ---        - - --           39, 136. 29                              -                -
        Second New Orleans district-............                                  3,976.61 -- --              .-        -580. 29                                ....
   Mississippi levees, including levee work
     around Cairo       and      certain   levees        necessary
     to keep water out of St. Francis Basin
     (Memphis district)___                    __                      ..._ 3, 393, 335. 22       $367, 212. 40 3, 336,159.       70                                $369, 131. 70
   Mississippi levees:
        Vicksburg district_______                                    __      1,731,933.37         475, 638. 02    1,  731,  623. 79                                  475, 672. 31
        Second New Orleans district_.....                                    1, 203, 040. 40                      1, 236, 337. 97
   South bank Arkansas levees (Vicksburg
     district) .                -----------                       -
                                                          -----......           140, 466. 93          3, 312. 99      139, 967. 56                                       6, 609. 95
   Boeuf Basin levees (Vicksburg district) .--                                  171, 287. 52        46, 392. 01       171, 045. 41                                      46, 486. 59
   South bank Red levees (second New Orleans
     district)----.......................---------------------                   46, 617. 22                           47, 223.85
   Atchafalaya River levees (second New
     Orleans district)_._....... ...              .. ...  _---    ...            70, 755. 19 ............              70,  766. 28
   Atchafalaya Basin protection levees (second
     New Orleans district) - _-- ....                                        4, 903,  284. 58                     4, 752,  714.  20
   Flowage floodways (Memphis district).......                                   45, 505. 45                           51, 317. 92
   Rights-of-way, floodway levees (Memphis
     district)    ..............................                                       60. 05                                60. 05
   South bank Red rights-of-way (levees)
     (second New Orleans district)__                    - -                       2, 912.43                             2, 912.43                               ...........
   Atchafalaya River rights-of-way (levees)
     (second New Orleans district)...... __                                .     10, 893.31                            10, 893. 31
   Rights-of-way protection levees (second New.
     Orleans district) __   ...     _____                _______                153, 557. 99                         153, 438. 21
   Rights-of-way and flowage, Bayou des Glaises                                                          .   .   .   .   -.   -.   -.   .

     set-back (second New Orleans district).....                                 28, 954.95                            29, 819. 80
   Other Atchafalaya River improvement (en-                                                   ... . ........
     largement and alteration of railway bridges),
     (second New Orleans district)__.                            _               27, 800. 93 ... ..... .....           27, 492. 43
   Construction Bonnet Carre (second New
     Orleans district) ..........................                                56, 385.  601,   097,       068.
                                                                                                                       56, 930. 08
                                                                                                                              42
                                                                                                                                                                ............
   Maintenance Bonnet Carre spillway (second                                                      110, 949. 33                                                      108, 807. 52
     New Orleans district)_______________
   Eudora floodway (Vicksburg district)-.......                                 463, 113.40                          417, 652. 93
  Yazoo Basin (Vicksburg district) .                                             99, 394. 90                           97,926.48
   West Atchafalaya floodway (second New
     Orleans district)_....._ ............                _______.               61, 148.09                            59, 919. 88
  Morganza floodway (second New Orleans
     district)...._ _.__ __-                                                     52, 877.  59                          52, 222. 09
   Outlet west of Berwick (second New Orleans
     district)-................                                                  69, 806.  12                         67,  872.  54
   Revetments:                                                                                 1, 097, 068.42                                                   1,100, 649. 57
        Memphis district-__.................                                    436, 099.  29                        429,  419.  85                               299. 381. 09
                                                                                 13, 305. 17
                                                                                                  208, 613. 28         19, 075. 55
        Vicksburg district.__. __                                                                 664, 354. 12                                                    734, 274. 02
        Second New Orleans district. ..........                                 641, 232. 75                         708, 874. 61
  Dredging:
        Memphis district .....              ............        ...        . 1, 653, 098.63                      1, 826, 834.53
        Vicksburg district___ _____                          __           . 2, 668, 524.89         20,           2, 289, 840. 71
                                                                                                                 1.28


        Second New Orleans district                             ...          5, 541, 211.90                      5,  878, 932. 92
                                                                                                    66,          5.12
   Contraction works:                                                                             213, 310. 07                                                      217, 985. 35
        Memphis district___.__
        Vicksburg district_..._                                                 176, 442. 35                         165, 956. 22                               -- - -- - -
   Surveys, gages, and observations:
        Rock Island district-. ____...-------                                        837. 23                               627. 55
        St. Louis district_....                                                  24, 136. 98                          21, 311. 69
       'Memphis district .-----------------                                     217, 607. 34                         213, 953.62
        Vicksburg district             ___                                      187, 202. 16                         177, 767. 30
        Second New Orleans district-............                                158, 784. 84                         158, 801.24
  Revolving       funds  (overhead):                                                                                                                                -9, 462. 51
        Waterways Experiment Station.-_____                                                                        -28, 387. 54
        Mississippi River Commission-_---                                                                             16, 574. 06                                        5, 524.68
        Office, Chief of Engineers (allotments for
          Mississippi River         Commission              work)        .                                                 470.88                                      156.96
  Plant:                                                                                                                                                          -38, 318. 47
        Memphis district_------------------                                                                      -135,     856. 41                                  21,364. 13
        Vicksburg district_____                                                                                      136. 888. 75                                 -15, 568. 70
        Second New Orleans            district                                                                   -265,     984. 93                               -15,          568.   70

                                                                                         I                                                  I               i

                                                                       (24,543,550.43       3, 186, 850. 64 24, 213, 443. 57 3, 322, 694. 19
             r


                 Total ---------.......... ....-------------- ---.--                                        I..   ----
                                                                                   27, 730, 401.07                   27, 536, 137.76
                                                                                         I                                                  II
                                 MISSISSIPPI RIVER COMMISSION                                                                         1681
Cost and expenditures during the year, exclusive of receipts from sales, etc.-Con.

                                                                              Costs                             Net expenditures


                                                                  New work         Maintenance                New work              Mainte
                                                                                                                                    nance



UNITED STATES PUBLIC WORKS ADMINISTRATION
              FUNDS (N. I. R. A.)
New project:
   Mississippi levees, including levee work
     around Cairo and certain levees necessary
     to keep water out of St. Francis Basin
     (Memphis district)--.
   Atchafalaya Basin protection levees (Second
                                                -                     $130. 95     _                               $85. 00

    New Orleans district)_                         -----_-_       -_411, 015.46 --------------                 470, 136. 85
   Revetments (Memphis district)                                                       ----------                    64. 73----------
   Dredging (Vicksburg district)_ __ ----                      -      2, 903.24-             -            -      3, 229. 33
                                                                   414, 049. 65 ----------           __        473, 515.91
     Total..........................-----------------------------
                                                                          414, 049. 65                               473, 515. 91

  UNITED STATES EMERGENCY RELIEF ADMINIS-
               TRATION FUNDS
New project:
   Levees, White River, Clarendon, Monroe
     County, Arkansas (Memphis district) _----                      76, 849.87     --------------               96,234.44
    Mississippi River levees (Vicksburg district)_                       -. 04            $2, 426.32             9, 520. 47          $4, 453. 29

                                                                    76, 849. 83           , 2, 426. 32         105, 754. 91           4, 453. 29
     Total-----------------------------------
                                                                            79, 276. 15                              110, 208. 20

                                                                   5,034,449.91        3, 189, 276. 96 24, 792, 714.39 3, 327, 147. 48
     Grand total United States funds-__........
                                                                        28, 223, 726. 87                           28,119,     861.87
        CONTRIBUTED FUNDS (REGULAR)

New project:
    Flood control, tributary levees and above
      Cairo (sec. 6, Flood Control Act approved
      May 15, 1928):
       St. Louis district.---.... _.--------
                                        .                            22, 785. 53 -------------                  22, 785. 53
       Vicksburg district--      -  - -   -   __-                    19, 568. 15- -----                         19,568.15       --
        Second New Orleans district.-----                             1, 988. 30 -----------                     1, 988. 30

          Total contributed funds__----                              44, 341.98                  .                  341.98
                                                                                                                44,4---_-_--    -

          Grand total United States and con-                      25,078,791.89        3, 189, 276. 96 24, 837, 056.37 3, 327,147. 48
            tributed   funds_.    .   ................        (          28,268, 068.85                             28,164, 203.85



    Condition at end of fiscal year.-The general survey of the Mis-
sissippi River from Head of Passes, La., to its headwaters at Lake
Itasca, Minn., a distance by river of 2,434 miles, has been completed
and maps of the river published. A resurvey from Cairo, Ill., to
the Head of Passes, La., a distance of 1,070 miles, has been completed
and maps published. Surveys in connection with topographic quad-
rangle map of alluvial valley lower Mississippi River, from Cape
Girardeau, Mo., at head of St. Francis Basin, to the Gulf of Mexico,
have been made and the map is now in process of publication. Spe-
cial surveys, including surveys of the Atchafalaya River and portion
of the Red and Black River, have been made. Various discharge,
gage, sediment, and other observations have been made on the Mis-
sissippi River and tributaries and the Gulf of Mexico. Works for
the improvement of the channel have been executed at various places
below Cairo and levees built for flood control from Rock Island, Ill.,
  to near Head of Passes, La., 484 miles above to 1,070 miles below
  Cairo. Effective revetment below Cairo is now in place and in good
condition on about 144 miles of river bank; about 3 miles of permeable
1682              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

dikes and about one-half mile of pile and rock groins for bank pro-
tection and about 35 miles of permeable dikes and about 10 miles of
sand dikes for channel regulation are also in place. There are 2,934
miles of levee (2,061 miles, sec. 1, main river; and 873 miles, sec. 6,
upper river and tributaries), with earthwork aggregating 996,616,383
cubic yards (907,903,256 cubic yards, sec. 1, and 88,713,127 cubic
yards, sec. 6). The existing levee system protects a total of about
27,855 square miles (26,312 square miles, sec. 1, and 1,543 square miles
under sec. 6 of act approved May 15, 1928) of land against ordinary
floods, about 94.4 percent of the total yardage required to complete
the levees under section 1 to the adopted grade and section is now
in place, and about 64.4 percent of the total yardage required to com-
plete the levees under section 6 to the approved grade and section is
now in place.
   There is now, with rare exceptions, a good navigable channel at
all stages, with a depth of 9 feet or more over a width of at least
300 feet for a distance of 741 miles below Cairo and a depth of not
less than 35 feet over a width of several hundred feet for the remain-
ing 240 miles to the Gulf of Mexico. The necessary plant required
for surveys, dredging, and bank protection and contraction work has
been constructed and maintained.
                                                                         1937
                                       Costs and expenditures to June 30SO,

                                                             Cost of new            Cost of main-              Total cost        Total net ex-
                                                                work                  tenance                                     penditures

      UNITED STATES FUNDS (SPECIFIC
            APPROPRIATIONS)

Old project (prior to Flood Control Act
  of May 15, 1928):
    River and harbor funds-
        Prior to Flood Control Act of
          Mar. 1, 1917.................---------------     $70, 514, 307. 01        $23, 140, 164. 37       $93, 654, 471. 38 $93, 654, 471. 38
           Subsequent to Flood Control Act
          of Mar. 1, 1917..............--------------...           91, 135. 35 ----------------                   91, 135. 35        91, 135. 35
     Flood control funds (all subsequent
       to Flood Control Act of Mar. 1,
      1917) --------------------------                      55, 395, 263. 99         25, 341, 835. 08        80, 737, 099. 07    80, 737, 099. 07
New project (Flood Control Act of May                              O'.oL4.                                                  a
  93)1928, as modified by act of June 15,
15,                                                          r
  1936):
     Flood control, regular'funds-.....---.....            212, 303, 076. 46         23, 763,999.45         236,067, 075.91     252, 086,928.68
     Flood control, National Industrial
       Recovery finds -1-....---........           .        34, 011, 798. 64          9, 984, 363. 95        43, 996, 162. 59    43, 994, 184.92
     Flood control, Emergency Relief Act
       funds..---------------------------                         293, 956. 70             47, 330. 81           341, 287. 51       339, 134. 51
           Total............----------------------         372, 609, 538. 15         82, 277, 693. 66       454, 887, 231. 81 470, 902, 953. 91

             CONTRIBUTED FUNDS

Old project.....-------------------------                   18, 689, 451. 26             625, 763. 38        19, 315, 214. 64   19, 315, 214. 64
New project:
   For regular work  .....                  1, 359, 539. 36
                                ...------------------                                      28, 390. 50        1, 387, 929. 86    1, 387, 929. 86
   For National Industrial Recovery
       Act work...........-------------------------                 5, 767. 46 .........------------.----          5, 767. 46         5, 767. 46

           Total... -----------------------.20, 054, 758. 08                             654, 153. 88        20, 708, 911. 96   20, 708, 911.96
            Grand total.............                       392, 664, 296. 23        82, 931, 847. 54        475, 596, 143. 77 491, 611, 865. 87



  Proposed operations.-The balance unexpended on June 30, 1937,
will be applied during the fiscal year 1938 in the prosecution of work
   SThis mileage is based on navigation of cut-offs at Ashbrook, Tarpley, Leland, Worthing-
ton, Sarah, Willow, Marshall, Diamond, Yucatan, Rodney, Giles, and Glasscock (September
1937).
                             MISSISSIPPI RIVER COMMISSION                                                               1683

under the modified project adopted by the Flood Control Acts ap-
proved May 15, 1928, and June 15, 1936. It is estimated that there
will be no available balance on June 30, 1938, from prior appro-
priations.
   The sum of $60,000,000 can be profitably expended during the
fiscal year ending June 30, 1939.
                                       Cost and financial summary

                                 UNITED STATES             FUNDS      (REGULAR)

Cost of new work to June 30, 1937 ___-_ --                                     _____-                $338, 303, 782. 81
Cost of maintenance to June 30, 1937  --                                        ____----               72, 245, 998. 90

      Total cost of permanent work to June 30, 1937____.                                                 410, 549, 781. 71
Undistributed costs June 3, 1937 --------   _ _17,                                                            269, 932. 37

      Net total cost to June 30, 1937_ ...-----                              -----                       427, 819, 714. 08
Plus accounts receivable June 30, 1937--------                           __---------                 -     1, 219, 436.04

     Gross total costs to June 30, 1937_       ___                                    _--___-            429, 039, 150. 12
Minus accounts payable June 30, 1937_________------                                                        2, 469, 515. 64

     Net total expenditures_--  ------------------------                                                 426, 569, 634.48
Unexpended balance June 30, 1937.-----------------------                                                   8, 889, 625. 69

         Total amount allotted to June 30, 1937_______________                                           435, 459, 260. 17

  Fiscal year ending            1933                1934                1935                  1936                   1937
       June 30

Cost of new work-..-.  $31, 784, 479. 67      $22, 058, 496. 03   $12, 520, 552. 07     $27, 554, 492. 17     $24, 543, 550. 43
Cost of maintenance___   4, 865, 030. 43        1,308, 833. 21      1, 234, 437. 15       3, 499, 245. 95       3, 186, 850. 64
      Total cost-.......   36, 649, 510. 10    23, 367, 329. 24    13, 754, 989. 22      31, 053, 738. 12      27, 730, 401. 07
Total expended-.......     38, 053, 564. 87    22, 741, 203. 52    15, 954, 613. 93      30, 091, 001. 76      27, 536, 137. 76
Allotted__-------------    50, 132, 504. 87     4,957, 226. 35     40, 682, 368. 98      22, 016, 252. 79      2   8, 367, 618. 93


Balance unexpended July 1, 1936-------_        --------------------                                      $28, 058, 114.52
Amount allotted from War Department Appro-
priation Act approved May 15, 1936---------          $7, 415, 016. 19
Amount allotted from War Department Second
  Deficiency Appropriation Act approved May
28, 1937-----------------------------------1,            000, 000. 00
                                                                                                            8, 415, 016. 19

        Amount to be accounted for---------------------------36,               473, 130. 71
   1 Does not include $4.995,214.54, allotted for surveys under sec. 10 of Flood Control
Act approved May 15, 1928 (work not under supervision of Mississippi River Commission) ;
$20,000, allotted to the first New Orleans district for Atchafalaya Basin protection leevees
(work not under supervision of Mississippi River Commission) ; $1,1490,600.10, impounded
savings carried to surplus fund as provided for in acts of June 30, 1932, Mar. 20, 1933,
and Mar. 28, 1934. and in Public Resolution No. 3, Seventy-fourth Congress, approved
Feb. 13, 1935; $47,367.26 revoked from the second New Orleans district under Emergency
Relief and Construction Act approved July 21, 1932 (fund no longer available for Missis-
sippi River Commission work) ; $43,997,440.31, net amount allotted from appropriation
for National Industrial Recovery, War-Flood Control, 1933-37; nor $358,454.30, net
amount allotted for work under supervision of Mississippi River Commission from appro-
priation for Emergency Relief, War, Rivers and Harbors, Flood Control, etc., 1935-37.
Amount of $174,482,705.80 included herein was expended on the old project (prior to
Flood Control Act of May 15, 1928) ; amount of $23,010,312.27 was made available under
provisions of par. 2, sec. 1 of Flood Control Act approved May 15, 1928; amount of $25,-
000 was appropriated by Public Res. No. 44, May 16, 1928, for flood protection on White
River, Woodruff and Monroe Counties, Ark.; and amount of $237,941,242.10 was
allotted under par. 1 of sec. 1 of Flood Control Act approved May 15, 1928, and sec. 13
of Flood Control Act approved June 15, 1936.
   s Does not include $107,200 allotted for surveys under sec. 10 of Flood Control Act
approved May 15, 1928.
1684                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Deductions on account of revocations under Emergency Relief
and Construction Act approved July 21, 1932__-      -__ __-                                                                            -$47,       367. 2
      Net amount to be accounted for ------------------                                                                                  36, 425, 763. 4
Gross amount expended _---      ----       __-$42, 838, 398. 80
Less-
    Reimbursements collected_ $15, 035,948. 12
    Receipts from sales------       266, 312.92
                                                 15, 302, 261.04
                                                                                                                                         27, 536, 137. 76

Balance unexpended June 30, 1937 ._____-                             8, 889, 625. 69
                                                               -___________-__
Outstanding liabilities June 30, 1937---------- $3, 349, 513. 86
Amount covered by uncompleted contracts----- 4, 299, 122. 96
                                                                     7, 648, 636. 82

Balance available June 30, 1937  __------ - -        -___-- 1, 240, 988. 87
Accounts receivable June 30, 1937__---__---------------     1, 219, 436. 04

     Unobligated balance available June 30, 1937-------__                                                                                2, 460, 424. 91
Amount made available subsequent to June 30, 1937--------                                                                               45, 000, 000. 00

               Amount available during fiscal year 1938___________                                                                       47, 460, 424.91

Amount unappropriated under                                                 authority of Flood-Control Acts
  approved May 15, 1928, and                                                June 15, 1936___________--___                              263, 846, 576. 00
Amount that can be profitably                                               expended in fiscal year ending
June 30, 1939, for new work                                                and maintenance-------------                               160, 000, 000. 00
1 Exclusive of available funds.
         UNITED STATES PUBLIC WORKS FUNDS                                                  (NATIONAL INDUSTRIAL RECOVERY ACT)

Cost of new work to June 30, 1937________
                                   .___.-                                                                                              $34, 011, 798. 64
Cost of maintenance to June 30, 1937________________--__                                                                                 9, 984, 363.95

      Total cost of permanent work to June 30, 1937----------                                                                            43, 996, 162. 59
Undistributed costs June 30, 1937_------ ------------                                                                                        -- 1, 881. 33

      Net total cost to June 30, 1937_____ -----------                                                                       --          43, 994, 281. 26
Plus accounts receivable June 30, 1937----------------                                                                                               .33

      Gross total costs to June 30, 1937-----------------------43, 994, 281. 59
Minus accounts payable June 30, 1937------------------ -------           96. 67
      Net total expenditures--------------------------------                                                                             43, 994, 184.92
Unexpended balance June 30, 1937----------------------------                                                                                   3, 255.39

               Total amount allotted to June 30, 1937-------                                                   _____- -__                43, 997, 440. 31

     Fiscal year ending June 30                                      1933                 1934                1935                   1936            1937


Cost of new work---...........                         -----------
                                                               ...                 $18, 827, 624. 17    $14, 433, 225. 00         $336, 899.82    $414, 049. 65
Cost of maintenance ---..                                     -------               - 6, 041, 171. 37     3, 943, 192. 58-
          Total cost...                  ----.............     ..........            24, 868, 795. 54    18, 376, 417. 58          336, 899. 82    414, 049. 65
Total expended-----------------                              ............         - 23, 942, 014. 01     19, 228, 237. 69          350, 417. 31    473, 515. 91

Allotted-........................-.........                                   .      42, 147, 874. 95     1,852, 125. 05           -2, 559. 69


Balance unexpended July 1, 1936-- --------                                                                           __-___- -_$476, 771.30
Gross amount expended---------------------                                                                           $507, 870. 51
Less reimbursements collected----------- ----                                                                          34, 354. 60
                                                                                                                        -          473, 515. 91

              Balance unexpended June 30, 1937 ---------------                                                                                    3, 255. 39
                                       MISSISSIPPI RIVER COMMISSION                                                                       1685
Outstanding liabilities June 30, 1937-----------,---------------                                                                     $2, 001.90

     Balance available June 30, 1937--------------------                                                             ------           1, 253. 49
Accounts receivable June 30, 1937-------------------                                                                                        .33

            Unobligated balance available June 30, 1937..---------------                                                              1, 253. 82
                              UNITED STATES FUNDS                               (EMERGENCY RELIEF ACT)

Cost of new work to June 30, 1937                                                  ------------------------                     $293, 956. 70
Cost of maintenance to June 30, 1937_                                           -----------------                                 47, 330. 81

      Total cost of permanent work to June 30, 1937- .--------                                                                   341, 287. 51
Minus accounts payable June 30, 1937----------------------                                                                         2, 153. 00

     Net total expenditures -------                                         _    _-_-------___--                                 339, 134. 51
Unexpended balance June 30, 1937                                           ---------------------------                            19, 319. 79
           Total amount allotted to June 30, 1937------------------358,                                                                 454. 30

           Fiscal year ending June 30                                   1933                1934         1935            1936            1937


Cost of new work____
                 .......       ------                 ____-     _--.-                ....------- -. ----.--..--      $217, 106. 87     $76, 849. 83
Cost of maintenance      __-____                                                   ------------ ----------
                                                                                                        _-----------   44, 904. 49       2, 426. 32
        Total cost- -            .-----.--.------------------.--.---------..-                                        262, 011.36        79, 276. 15
Total expended___....-.--..--------.                                             -------.                            228, 926. 31      110, 208. 20
Allotted.... ------------------------------------------------                                           -------- 413, 886.00          -55, 431. 70


Balance unexpended July 1, 1936_________________----------__ $184, 959.69
Deductions on account of revocations under Emergency Relief Ap-
  propriation Act approved Apr. 8, 1935---------------------    55, 431. 70
      Net amount to be accounted for _________________     __                                                                    129, 527.      99
Gross amount expended_________________________     $110, 715. 17
Less reimbursements collected ----------------------     506. 97
                                                                                                                                 110, 208. 20
      Balance unexpended June 30, 1937----------------------19,                                                                         319. 79
Outstanding liabilities June 30, 1937___________________ $4, 408. 89
Amount covered by uncompleted contracts----------__       4, 860. 90
                                                                                                                                     9, 319. 79
            Balance available June 30, 1937                                         ----------------------- 10, 000. 00
         CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED STATES FUNDS

Cost of new work to June 30, 1937   --------------------   $372, 609, 538. 15
Cost of maintenance to June 30, 1937----------------------82,    277, 693. 66
      Total cost of permanent work to June 30, 1937                                                 ---------            454, 887, 231. 81
Undistributed costs June 30, 1937__----___-----_______________                                                            17, 268, 051.04
      Net total cost to June 30, 1937_____________________
                                                    ---                                                                  472,155, 282. 85
Plus accounts receivable June 30, 1937---------------------                                                                1, 219, 436. 37
     Gross total costs to June 30, 1937-------------------                                                               473, 374, 719. 22
Minus accounts payable June 30, 1937-----______________
                                                      -2,                                                                     471, 765.31
     Net total expenditures__----------------------------                                                                470, 902, 953. 91
Unexpended balance June 30, 1937------------------------                                                                   8, 912, 200. 87
            Total amount allotted to June 30, 1937                                                                        479, 815.154. 78
1686        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


  Fiscal year ending            1933               1934                1935                 1936                 1937
       June 30


Cost of new work --...    $31, 784, 479. 67   $40, 886, 120. 20   $26, 953, 777. 07   $28, 108, 498. 86     $25, 034, 419. 91
Cost of maintenance___      4, 865, 030. 43     7, 350, 004. 58     5, 177, 629. 73     3, 544, 150. 44       3, 189, 276. 96

      Total cost.......    36, 649, 510. 10    48, 236, 124. 78    32, 131, 406. 80    31, 652, 649. 30      28, 223, 726. 87

Total expended--------.    38, 053, 564. 87    46, 683, 217. 53    35, 182, 851. 62    30, 670, 345. 38      28, 119, 861. 87

Allotted-------------      50, 132, 504.87     47, 105, 101. 30    42, 534, 494. 03    22, 427, 579. 10       8, 312, 217. 23


Balance unexpended July 1, 1936___________________________ $28,719,845.51
Amount allotted from War Department Appropri-
  ation Act approved May 15, 1936 ____        __ $7,415,016.19
Amount allotted from War Department Appropri-
  ation Second Deficiency Act approved May 28,
   1937__--------------------------------------- 1,000, 000.00
                                                               8, 415, 016. 19

      Amount to be accounted for--____-------------------                                                37,134,861.70
Deductions on account of--
   Revocations under Emergency Relief and
      Construction Act approved July 21, 1932__  $47, 367.26
    Revocations under Emergency Relief Ap-
      propriation Act approved Apr. 8, 1935 __-    55, 431. 70
                                                                                                            102, 798.96

       Net amount to be accounted for___ _________--------37,                                               032, 062. 74
Gross amount expended---     ______-------___       43,456, 984.48
Less--
    Reimbursements collected___ $15, 070, 809. 69
    Receipts from sales--------       266, 312. 92
                                                    15, 337, 122. 61
                                                                                                         28, 119, 861.87

      Balance unexpended June 30, 1937----------------___                                                 8, 912, 200. 87
Outstanding liabilities June 30, 1937------------ $3,355,974.65
Amount covered by uncompleted contracts------      4, 303,983. 86
                                                                                                          7, 659, 958. 51

      Balance available June 30, 1937_--__----------- ---                                          -1,       252, 242.36
Accounts receivable June 30, 1937__----   __ ---------------                                              1, 219, 436.37

     Unobligated balance available June 30, 1937----------2,471,678.73
Amount made available subsequent to June 30, 1937----------45, 000, 000. 00

Amount available during fiscal year 1938__------------- ____ 47, 471, 678.73
Amount unappropriated under authority of Flood Control Acts
approved May 15, 1928 and June 15, 1936                     263,846,576.00
Amount that can be profitably expended in fiscal year ending

   June 30, 1939, for new work and maintenance - - - - - - - -
                                                               ---                                       60, 000, 000.00
   1Exclusive of available funds.

                              CONTRIBUTED FUNDS FOR REGULAR WORK

Cost of new work to June 30, 1937_ _______________---------$20, 048, 990. 62
Cost of maintenance to June 30, 1937--____  ___6-------------   654, 153.88

         Total cost of permanent work to June 30, 1937--------                                           20, 703, 144. 50

Net total expenditures--------- -----------------------------                                            20, 703, 144. 50
Unexpended balance June 30, 1937_           ---------------                                                  105, 444.32
        Total amount contributed to June 30, 1937------------                                            20, 808, 588.82
                                   MISSISSIPPI RIVER COMMISSION                                                                      1687

    Fiscal year ending June 30                    1933                1934                 1935                 1936                1937


'Cost of new work . __ ....
                        _____-          _     $358, 917. 61      $158, 969. 18        $56, 572. 58            $54, 760. 83       $44, 341. 98
Cost of maintenance- ...--- ----- ---..---------.----------------------------                                                --------------
Total expended        ....----------------     358, 917. 61        158, 969. 18           56, 572. 58          54, 760. 83        44, 341. 98

Contributed______-------------                -- 14, 791. 76      -27, 654. 36            46, 005. 15           6, 001. 93        99, 819. 42



Balance unexpended July 1, 1936_-------------------------------__    $49, 966.88
Amount contributed under sec. 6 of Flood Control Act approved
May 15, 1928--__-____---------------------------------------------103, 093. 33
      Amount to be accounted for--------------------------          153, 060.21
Deductions on account of unexpended balances being returned to con-
  tributors----------------------------------- -------------          3, 273. 91

      Net amount to be accounted for---------------------------                                                              149, 786. 30
Gross amount expended_-----------------------------------------                                                               44, 341.98
      Balance unexpended June 30, 1937-------------------------       105, 444. 32
Outstanding liabilities June 30, 1937-------------------- $1, 335. 74
Amount covered by uncompleted contracts                   60, 203. 89
                                                                       61, 539. 63
          Balance available June 30, 1937----------                                            -----------                    43, 904. 69

                                             Cost and financial ummary
CONTRIBUTED FUNDS                FOR PUBLIC WORKS PROGRAM                             (NATIONAL INDUSTRIAL RECOVERY
                                                                 ACT)


Cost of new work to June 30, 1937-------------------------------- $5, 767. 46
Cost of maintenance to June 30, 1937        -----------           ---------
      Total cost of permanent work to June 30, 1937-----------------                                                           5, 767. 46
Net total expenditures -------------------------------------------                                                             5, 767. 46
Total amount contributed to June 30, 1937 -----------------------                                                              5, 767. 46

          Fiscal year ending June 30                           1933            1934                1935             1936             1937


Cost of new work..............                                               $4, 392. 14      $1, 375. 32 ............
Cost of maintenance....
Total expended_........................._.                         . -       4,392. 14            1,375.32-
Contributed---.............---------------------------------                  6,444. 59           -665. 03        -$12. 10 ......


         CONSOLIDATED            COST AND         FINANCIAL           SUMMARY              FOR CONTRIBUTED                   FUNDS


Cost of new work to June 30, 1937__-_-_-____--11111111_                                                             $20, 054, 758. 08
Cost of maintenance to June 30, 1937------------------------                                                             654, 153. 88
           Total cost of permanent work to June 30, 1937                                      ---------                  20, 708, 911.96
Net total expenditures--------------------------------------                                                             20, 708, 911.96
Unexpended balance June 30, 1937--------------------------                                                                   105, 444. 32
           Total amount contributed to June 30. 1937....-------------                                                    20. 814. 356. 28
1688             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


    Fiscal year ending June 30                       1933             1934                 1935                 1936              1937


Cost of new work------------.............      $358, 917. 61       $163, 361. 32      $57,947. 90            $54, 760.83        $44,341.98
Cost of maintenance-............. --------------------------------------------                                              --------------
Total expended----------------                  358, 917. 61        163, 361. 32          57, 947.90         54, 760. 83         44, 341.98
Contributed-------                .-----------14, 791.76           -21, 209. 77           45, 340. 12           5,989.83         99,819. 42


Balance unexepended July 1, 1936 ------
                                  ___--__--_--_--         _                                                                $49, 966.88
Amount contributed under sec. 6 of Flood Control Act approved
  May 15, 1928------------------------------------------                                                                    103, 093.33
      Amount to be accounted for ___________________- __-                                                                  153, 060. 21
Deductions on account of unexpended balances being returned
  to contributors-------------------------------------------                                                                   3, 273. 91

      Net amount to be accounted for __._____ __-..---- --                                                              -- 149, 786. 30
Gross amount expended----------------------------_----                                                                      44, 341. 98

      Balance unexpended June 30, 1937---                                                                                         444. 32
                                                                                                                            1--------------
                                                                                                                           105,
Outstanding liabilities June 30, 1937------_--__-                                             $1, 335. 74
Amount covered by uncompleted contracts                                                       6-______
                                                                                              60, 203. 89
                                                                                                                             61, 539. 63

           Balance available June 30, 1937                          -------------------------                                43,904. 69

CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED STATES AND CONTRIBUTED
                                  FUNDS

Cost of new work to June 30, 1937                                                                          __      $392, 664, 296. 23
Cost of maintenance to June 30, 1937__---                                          ___-------                        82, 931, 847. 54

      Total cost of permanent work to June 30, 1937---- ___--                                                          475, 596, 143. 77
Undistributed costs June 30, 1937------      ___      ------____                                                        17, 268, 051. 04

      Net total cost to June 30, 1937---------------------    492, 864, 194. 81
Plus accounts receivable June 30, 1937-----------------------1,    219,436. 37

     Gross total costs to June 30, 1937__----------------      494, 083, 631. 18
Minus accounts payable June 30, 1937----------                      471, 765. 31
                                                          -_______----2,

     Net total expenditures________--     __                                                                           491, 611, 865. 87
Unexpended balance June 30, 1937_ -----___________--                                                                     9, 017, 645. 19

           Total amount allotted and contributed to June 30, 1937__                                                    500, 629, 511. 06

   Fiscal year ending                   1933                1934                   1935                     1936                1937
          June 30

Cost of new work......           $32, 143, 397. 28     $41, 049,481. 52      $27, 01, 724. 97      $28, 163, 259. 69        $25, 078,791. 89
Cost of maintenance.._             4, 865, 030. 43       7, 350, 004. 58       5, 177, 629. 73       3, 544, 150. 44          3, 189, 276. 96
        Total cost-.......        37, 008, 427. 71      48, 399, 486. 10      32, 189, 354. 70         31, 707, 410. 13      28, 268, 068. 85
Total expended-.._....            38, 412, 482. 48      46, 846, 578. 85      35, 240, 799. 52         30, 725, 106. 21      28, 164, 203. 85
Allotted and contri-              50, 117, 713. 11      47, 083, 891. 53      42, 579, 834. 15         22, 433, 568. 93       8, 412, 036. 65
  buted ................

Balance unexpended July 1, 1936_______                                                                  -_______
                                                                                                  -______   $28, 769, 812. 39
Amount contributed under sec. 6 of Flood Con-
  trol Act approved May 15, 1928__-________                                                $103, 093. 33
Amount allotted from War Department Appro-
    priation Act approved May 15, 1936-------- 7, 415, 016. 19
                                           MISSISSIPPI RIVER COMMISSION                                                           1689
Amount allotted from War Department Second
Deficiency Appropriation Act approved May
28, 1937----------------------------------- $1, 000,0000.00
                                                                                                                      $8, 518, 109. 52

      Amount to be accounted for _                                                                                37, 287, 921. 91
                                                                                                 __-----------_-----
Deduction on account of-
   Revocations under Emergency Relief and
      Construction Act approved July 21, 1932__                                                 $47, 367. 26
   Revocations under Emergency Relief Appro-
      priation Act approved Apr. 8, 1935----.---                                                 55, 431. 70
   Unexpended balances beingi returned to
      contributors----------------------------                                                     3,I 273. 91
                                                                                                                            106, 072. 87

      Net amount to be accounted for______           ________----                                                     37, 181, 849. 04
Gross amount expended_____-___------_ $43, 501, 326.46
Less:
    Reimbursements collected___$15, 070,809. 69
    Receipts from sales--------      266, 312. 92
                                                  15, 337, 122. 61
                                                                                                                      28, 164, 203. 85

      Balance unexpended June 30, 1937_ -      __                                                                      9, 017, 645. 19
Outstanding liabilities June 30, 1937--------- $3, 357, 310. 39
Amount covered by uncompleted contracts___-       4, 364, 187.75
                                                                                                                       7, 721, 498. 14

     Balance available June 30, 1937-----------------------                                                            1, 296, 147. 05
Accounts receivable June 30, 1937-------1,--------   --------                                                          1, 219, 436. 37

     Unobligated balance available June 30, 1937-        ..-------- 2,515, 583.42
Amount made available subsequent to June 30, 1937-------          45, 000, 000. 00

Amount available during fiscal year 1938__ __--                                             -       -____-            47, 515, 583.42

Amount unappropriated under authority of Flood Control Acts
approved May 15, 1928, and June 15, 1936-----------                                                               263, 846, 576. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1939, for new work and maintenance--                                                                        60, 000, 000oo.00
    1Exclusive           of available funds.
                                                                          1
                                           Cost and financial summary-Plant
Undistributed costs June 30, 1937-------------------------                                                         $16, 033, 238. 42

Net total cost to June 30, 1937      --------------------------                                                       16, 033, 238. 42
Plus accounts receivable June 30, 1937----   ___________--_-                                                              523, 469. 55

     Gross total costs to June 30, 1937-----------------                                                              16, 556, 707. 97
Minus accounts payable June 30, 1937     ____-------                                                  ___---495,               985. 55
      Net total expenditures-----______                                        ______________             --          16, 060, 722. 42
Unexpended balance June 30, 1937 ---                                             -----------------                    1, 688, 198. 12
             Total amount allotted to June 30, 1937                                                                   17, 748, 920. 54

    Fiscal year ending June 30                           1933              1934             1935               1936              1937


Total expended                     ---...............................                 $16, 294, 262. 04   $63,936. 01        -$297, 475. 63

Allotted ..................-----                   .-------.-------     .17,              506, 891. 57    852, 528. 97        -610, 500. 00


  1Data shown in this table are included in foregoing consolidated cost and financial
summary for United States and contributed funds.
1690         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Balance unexpended July 1, 1936 ------------------                            $2, 001, 222.49
Amount allotted from War Department Appropriation Act ap-
  proved May 15, 1936                              __-----------------------------
                                                                 __                125,000.00

     Amount            to be accounted for__________________-- -    -___                                    2, 126, 222. 49
Deductions on          account of revocations of allotments under War
Department            Appropriation Acts of Mar. 4, 1933 ($100,000)
  and Apr. 9,                                                          _
                       1935 ($635,500) --- -----------------------------                                          735, 500. 00

      Net amount to be accounted for_________     _ _______                                                 1, 390, 722. 49
Gross amount expended ____-.      ______-____ $10,733, 961.96
Less:
    Reimbursements collected__ $10, 793, 502. 41
    Receipts from sales--------     237, 935. 18
                                                 11, 031, 437.59
                                                                                                            -297,        475.63

      Balance unexpended June 30, 1937           _                       1, 688, 198. 12
                                                             _-----------------
Outstanding liabilities June 30, 1937__---------   $1,232, 222. 74
Amount covered by uncompleted contracts------           1, 500. 00
                                                                         1, 233, 722. 74
     Balance available June 30, 1937_---------------------                                                        454, 475. 38
Accounts receivable June 30, 1937--------------------------                                                       523, 469. 55

        Unobligated balance available June 30, 1937_------------                                                  977, 944.93

             EMERGENCY WORK ON TRIBUTARIES OF MISSISSIPPI RIVER

   Under section 7 of the Flood Control Act approved May 15, 1928,
the appropriatiqn of $5,000,000 was authorized as an emergency fund
to be allotted by the Secretary of War on the recommendation of the
Chief of Engineers in rescue work or in the repair or maintenance of
any flood-control work on any tributaries of the Mississippi River
threatened or destroyed by flood, including the flood of 1927.
   Prior to the fiscal year 1937, total appropriations under section 7
amounted to the authorized $5,000,000, and during the fiscal year
1937 no additional appropriations were made.
   Future appropriations for similar work will be made from
$15,000,000 authorized to be appropriated under provisions of section
9 of the Flood Control Act approved June 15, 1936.
   The costs and expenditures under the emergency fund during the
year, exclusive of receipts from sales, etc., are summarized below:

                                                                             Costs                   Net expenditures
   Emergency fund for flood control on tributaries of
                 Mississippi River
                                                                 New work             Mainte-
                                                                                      nance        New work            Mainte-
                                                                                                                       nance
                                                             I




                  ROCK ISLAND DISTRICT

Repair of levees on Fox River, Sugar and Honey Creeks
in Mississippi and Fox River drainage district, Clark
  County, Mo_            _ __                          _--             $140. 00                          $140.00----------
Restoring J. C. Klein levee, left bank Cedar River,
  Muscatine County, Iowa..........----------------------..        4, 574.89                         4, 574.89        -.-........
Repairs to levees, Green Bay levee and drainage dis-
trict no. 2, Lee County, Iowa---------------------..                    37. 70                            37.70
                                                                                  4    -9           4
      Total ........                                              4,    752. 59   1-____________    4,   752.59     ____________
                                      MISSISSIPPI RIVER COMMISSION                                                                                               1691

                                                                                            Costs                                 Net expenditures
   Emergency fund for flood control on tributaries of
                 Mississippi River
                                                                                 New work               Mainte-           New work                          Mainte-
                                                                                                         nance                                              nance

                         ST. LOUIS DISTRICT

Repair of levees in levee district no. 3, Perry County,
Mo_.. ..                                  --                                                           $5, 187. 12 ........
                                                                                                                        -                                       $5, 187. 12
Repair of levees, Clear Creek drainage and levee dis-
trict, Illinois ,- -----------------  .----------- .------ _                                            4, 668. 45       -...     ...                           4, 668. 45
                                                                                                   i                  I                           I                              -

        Total ........................                . ..    .. ......      _   __..-...                9, 855. 57 I- -                                         9, 855. 57
                                                                                                -I             .    I                             I                         -
                          MEMPHIS DISTRICT

Repair of levees at Padgett Island, White River, Ark..                                  $1.23                                            $1.23-
Emergency flood protection:
   St. Francis River and tributaries, Arkansas and
     Missouri_                    -      --                                         113, 945. 39                          113, 321. 85 -----                                     -
   Arkansas River and tributaries, Arkansas- -                                ----       456.46                                542.20
   White River and tributaries, Arkansas___                                   _ __ 28,048. 65                              28,055. 22
Repair of levees:
   Wikle levee district, Neosho River, Kans. (near
     Erie, Kans.) -------                                                             1,789.79                                   1,749.04..........-
   Sare levee district, Neosho River, Kans. (near Erie,
     Kans.) ...-.................                           ..........                4, 963. 02                                 4, 963.02___                          _ _ _
   Nixon levee district, Neosho River, Kans. (near
     Chanute, Kans.) ----                 -------               -       -----         1, 756.43                                   1,718.93..........-
   Delos-Johnson levee district, Neosho River, Kans.
      (near Rollin, Kans.)_______ _____________--     -            ______                658.52                                      658.52.....
   Lawrence levee district, Neosho River, Kans. (near
      Rollin, Kans.)           - -                                                    2,363.91                                    2, 338. 44 _____                           _.
   Sheltz levee district, Neosho River (near Erie,
     Kans.) -                        -                    -                           7, 344. 20                                  7,344.20..........-
   Drainage district no. 17, Little River, Mississippi
      County, Ark _....                                                               8, 513.94                                  12, 552. 26 .........
   Gibbons levee district, Neosho River, Kans. (near
      St. Paul, Kans.)_-                                -                --           2, 554. 50                                  2, 554. 50._........
   Dutton levee district, Neosho River, Kans. (near
      Erie,. Kans.)          -    -   -       -                       -               4,067.92                                    4,064.95                  _          .-- .
                                                                                                                                                                        ..---
   Nation levee district, Neosho River, Kans. (near
      Shaw, Kans.)_-                  -                                               4, 382.78                                   4,353.18 ._......
   Brogan levee district, Neosho River, Kans. (near
      St. Paul, Kans.)__--                  _ ______                                  8,766.54                                    8,747.83 .........
   Isett-Blackburn levee district, Neosho River, Kans.
      (near Chanute, Kans.)________                                                   3,163.38                                    3,139.12 .........
   Heath levee district, Neosho River, Kans. (near St.
      Paul, K ans.) _           ---
                                 .--------- --                     -------- 4,391.59                   ------------               4, 355. 79          ----- -----
   Linden levee district, Neosho River, Kans. (near
      St. Paul. Kans.) .. .......              .......... .....__--                   3,837.74                                    3. 837. 74          ------------

   Rosenthal levee district, Neosho River (near Cha-
      ute, K ans.)-- - - - - - - - - - - - - - - -                                    5,072. 10        -----------                5,072.10            - -       - - - - - -          -

   Allen levee district, Neosho County, Kans., Neosho
      River (near St.Paul, Kans.).......____...
   White River levee district of Woodruff, Prairie, and
      Monroe Counties, Ark_........ __
                                                                     __....              735. 62
                                                                                                       -----------                   733. 19          - -       - - - - - -          -




                                                       ..      ..           ....._       151.47                                      151.47
   Neosho River, Kans., in Hewitt levee district,                                                      ------------                                   - -       - - - - - -          -




      Neosho County, Kans. ..... __ _.______      ...
   Arkansas River, Dardanelle drainage district, Yell
                                                                        _____            171.01        -,---------                   171.01           - -       - --   --    -       -




      County, Ark-......................                                              4,216.88                                    4,187.82
   Arkansas River in drainage and levee district no. 1,
      Pope County, Ark-........                                                       3, 894. 91
                                                                                                       -----------                3,894.91
   Arkansas River in Crawford County levee district
      (near Van Buren, Ark.)....................
   Little Red River levee district no. 2, White County,
                                                                                        -19. 13        -rrrrrr----                        5.00        ------------




      Ark-...................                                                         8,995.77         -----------                8,341.45                      --------"

   Western Clay drainage district, Clay County, Ark.
      (Black River) ..................................
   Arkansas River. in Plum Bayou levee district (near
                                                                                   I 1, 624. 21        --r-------
                                                                                                       r----------                1,612.42            ------------




      England. Ark )_........... ............ .........._ 30,341.33
   Carlton Hall on Verdigris River, Kans .............                                      3.97       -----------               21,182.88
                                                                                                                                      6.00
                                                                                                                                                      --    -   - -    -    - - --




   Neosho River at the Blair Farm (near Chanute,                                                                                                      ------------


      Kans.) ...........................................                                    7.73                                         11.51         -------------

   Drainage district no. 7, Poinsett County, Ark., on                                                  r-r-r-----,-
      St Francis River .......                . ... . ...... _                       40,485.10                                   38, 972.58           ------------

    Cardens Bottom levee district no. 2, Arkansas
      River (near Dardanelle, Ark.)..---------- .                                     1, 898.17                                   1,898.17
    Elias Private levee, Verdigris River (Big Hill
      Cfeek) near Coffeyville, 'Montgomery County,
      Kans .....----------                                                            8, 159.82                                   3, 159. 82          .........
   Mathes levee district, Neosho River, Kans. (near
      Erie, Kans.)            ----------------------------                            3,458.91                                    3,444.30 ----------
1692                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937


                                                                                                            Costs                         Net expenditures
    Emergency fund for flood control on tributaries of
                  Mississippi River                                                                                     Mainte-                            Mainte-
                                                                                                                         nance                              nance


      Butler levee district, Neosho River, Kans. (near
        Erie, Kans.)- __------------------------     -----                                     $2, 076. 71 ------------                 $2, 074. 37 ---------..........--
      Shawneetown, Ill., Ohio River (122 miles above
        Cairo, Ill.) -----------------------------------                                        2, 228. 04        ...        ...
            Total ----------------------------------------                                   309, 508. 61----------- 299, 217. 02
                             VICKSBURG DISTRICT

Emergency flood protection, Upper Yazoo River and
tributaries, Miss._------     ----------------------- 25,174. 91 ------------  24, 793. 91
Repair of levees, Sledge Bayou drainage district, Quit-
man County, Miss----------------------------------------            ------------     3.96...

         Total......................-------------     .....................----------------------25, 174. 91 -----------... 24, 797. 87

                   SECOND NEW ORLEANS DISTRICT

Flood relief, Red River and Bayou Des Glaises levee
  district, Louisiana--     -----------------------------------------------                                                            ------------             $10. 80
Repair of levees, south bank, Red River......-----------------     $11,742.02--
                                                                   $11, 742. 02                                                                             11, 742.02

         Total-------....................................---------------------------------....... ------------          11,742.02    ------------           11,752.82

            rand total---------------------                                   ---              339, 436. 11 21, 597. 59               328, 767. 48    21, 608. 39
                        Grand total                                                                  361, 033. 70                            350,375.87



                                                       Cost and financial sumnary

UNITED STATES FUNDS (SEC. 7 OF FLOOD CONTROL ACT APPROVED MAY 15,                                                                                    1928; AND
            SEO. 9 OF FLOOD CONTROL ACT APPROVED JUNE 15, 1936)

Cost of new work to June 30, 1937---------------------------$3, 776, 150. 22
Cost of maintenance to June 30, 1937                                  236. 83
                                                                6--------------------------04,

      Total cost of permanent work to June 30, 1937-----------14, 380, 387. 05
Undistributed costs June 30, 1937-------------------                     3. 96

      Net total cost to June 30, 1937---------------------------                                                                               4, 380, 391. 01
Minus accounts payable June 30, 1937--------------------------                                                                                     16, 895, 91

     Net total expenditures--------------------------------14, 363, 495. 10
Unexpended balance June 30, 1937------------------------- ---  341, 777. 53

             Total amount allotted to June 30, 1937---------------                                                                             4, 705, 272. 63

       Fiscal year ending June 30                             1933                    1934                       1935                 1936                  1937


Cost of new work...-..-.........                         $342,427.87             $366, 288. 12           $645, 273.98              $329, 320. 27         $339, 436. 11
Cost of maintenance-..----------.......                    24, 054. 70              8, 556. 27             42, 192. 71               24, 508. 56           21, 597. 59
         Total cost..---------------                      366, 482. 57              374, 844. 39          687, 466. 69              353, 828. 83          361, 033. 70

Total expended----...........------------.....            337, 304. 53              362, 438. 62          630, 736.14               430, 411. 69          350, 375. 87

Allotted..................---------------------           580, 581. 04              407, 001.88           469, 740. 35              362, 757. 45          524, 472. 11


Balance unexpended July 1, 1936-----------------------------                                                                                       $167, 681.29
Amount allotted from War Department Appropriation Act ap-
proved May 15, 1936-----------------------------------------                                                                                       524, 472. 11
            Amount to be accounted for__-----------------------------                                                                               692, 153. 40
  ' Exclusive of $2,866.78 contributed funds, of which $2,441.78
and $425 for maintenance.
                                                                                                                           was expended for new work

   2 Exclusive of unallotted balance amounting to $280,349.39 (War Department Appropria-
tion Act of May 15, 1936) ; and impounded savings carried to surplus fund amounting to
$14,377.98; and $2,866.76, contributed funds.   The authorized $5,000,000 was appropriated
prior to fiscal year 1937.
                        MISSISSIPPI RIVER COMMISSION                                 1693
Gross amount expended--------------------------$362, 207. 37
Less reimbursements collected---------------------11, 831. 50
                                                                              $350, 375. 87
      Balance unexpended June 30, 1937----------------------                   341, 777. 53
Outstanding liabilities June 30, 1937-------------- $8, 253. 25
Amount covered by uncompleted contracts--------     14, 704. 81
                                                                                22, 958. 06
     Balance available June 30, 1937--- ---  -----------------                 318, 819. 47
Amount appropriated in War Department Civil Appropriation Act
approved July 19, 1937---- ----------------------------                       300, 000. 00
       Amount available for fiscal year 1938--------------------              -618, 819. 47

Amount unappropriated under authority of sec. 9 of Flood Con-
trol Act approved June 15, 1936-------------- ------------- 14, 700, 000.00
Amount that can be profitably expended in fiscal year ending
                                             3- - - - - - - - - - - - - - - -
June 30, 1939, for new work and maintenance                                  300, 000. 00
  8 Exclusive of available funds.   Includes amount to be expended in southwestern division.

ANNUAL REPORT OF THE PRESIDENT, MISSISSIPPI RIVER COMMIS-
       SION, FOR THE FISCAL YEAR ENDED JUNE 30, 1937

                OFFICE PRESIDENT, MISSISSIPPI RIVER COMMISSION,
                              Vicksburg, Miss., October 7, 1937.
Subject: Annual Report for 1937.
To: The Chief of Engineers, United States Army.
                             LOCATION AND DESCRIPTION


   The Mississippi River rises at Lake Itasca, Minn., and flows in a
general southerly direction 2,434 miles and empties into the Gulf of
Mexico, La. The project comprises navigation, flood control, and
correlated works on the Mississippi River from Cape Girardeau,
Mo. (54 miles above Cairo, Ill., gage), to the Head of Passes, La.
(1,070 miles below Cairo gage) ; and flood-control works in the upper
Mississippi River from Cape Girardeau, Mo., to Rock Island, Ill.
 (430 miles) ; on the outlets of the Mississippi River, and on its tribu-
taries up to the limit of backwater effect of the Mississippi River.
                       OFFICE OF PRESIDENT AND DISTRICTS

   Four engineer officers of the Army have been detailed as assistants
to the President of the Commission of which one is secretary of the
Commission, and two are assigned to the waterways experiment
station.
   The river has been divided into five engineer districts as a matter
of convenience in administration, and engineer officers of the Army
are detailed as district engineers in charge thereof. The duties of
the district engineers consist of the prosecution of general surveys,
including field work, reduction and plotting of field notes and maps,
and maintenance of permanent marks pertaining to surveys; main-
tenance and observation of all high-water gages, regular river and
tide gages; discharge and slope observations on the Mississippi River
and its tributaries; preparing plans and specifications; maintenance
of a navigable channel; and carrying on general construction and
improvement work in accordance with Flood Control Act approved
1694    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

May 15, 1928, and amendments, under the supervision of the Chief
of Ehgineers, in their respective districts; and the disbursement of
funds allotted by the Chief of Engineers to their respective districts
in carrying out the provisions of the existing project.
   The district limits for flood-control work are as follows:
   Rock Island engineer district.-Mississippi River from upper limits
of St. Louis district (Hamburg Bay, Ill., mile 263, above Cairo, Ill.,
on left (east) bank and Clarksville, Mo., mile 275, above Cairo, Ill.,
on right (west) bank), to Rock Island, Ill., mile 484, above Cario,
Ill., 221 miles on left bank and 209 miles on right bank. District
headquarters are at Rock Island, Ill.
   St. Louis engineer district.-Mississippi River, from upper limits
of Memphis district (Thebes, Ill., mile 46, above Cairo Ill., on left
 (east) bank and north bank of mouth of Little River Diversion
Channel, Mo. (just below Cape Girardeau, Mo.), mile 51, above
Cairo, Ill., on right bank) to lower limits of Rock Island district
 (Hamburg Bay, Ill., mile 263, above Cairo, Ill., on left bank and
Clarksville, Mo., mile 275, above Cairo, Ill., on right bank) 224 miles
on left (east) bank and 217 miles on right (west) bank. This dis-
trict has charge also of flood-control operations within the limits of
Mississippi River backwater influence on the Illinois and Missouri
Rivers. The jurisdiction of Commission as to flood control was
extended to include the backwater zones of tributaries of the Mis-
sissippi River by the Flood Control Act of 1923. The limit of the
jurisdiction thus conferred has been taken as the point beyond which
a levee designed for protection against maximum flood of the tribu-
tary alone would not have to be made higher by reason of possible
high water of the Mississippi River. In other words, it is the point
where the backwater curve from the maximum Mississippi River
flood meets the maximum flood line of the tributary. On the Illinois
River this point has been fixed at mile 120, near Havana, Ill., and on
the Missouri River at St. Charles, Mo. District headquarters are at
St. Louis, Mo.
   Memphis engineer district.-Mississippi River, from north bank of
mouth of Little River Diversion Channel, Mo. (just south of Cape
Girardeau, Mo.), on right bank, and Thebes, Ill., on left bank, to the
south bank of Arkansas River, 447 miles on right bank, and to Coa-
homa-Bolivar County line, Mississippi, 407 miles on left bank, of which
mouth of Little River Diversion Channel to Cairo, Ill., 51 miles on
right bank, and Thebes to Cairo, 46 miles on left bank, is restricted
to levee work. This district has charge of all Commission work on
the following tributaries: Ohio River to mouth of Cache River (act
July 27, 1916) ; to above Shawneetown, Ill. (backwater limit) ; White
River to Peach Orchard Bluff, Ark. (backwater limit); St. Francis
River to the mouth of the Tyronza River just above Parkin (back-
water limit); and the north bank of the Arkansas River to the line
between secs. 10 and 11, T. 7 S., R. 5 W., fifth principal meridian,
near Lake Point, Ark. (backwater limit), to division line between
Lincoln-Jefferson Counties, Ark. (act July 27, 1916). District head-
quarters are located on Government reservation at West Memphis,
Ark., opposite Memphis, Tenn.
   Vicksburg engineer district.-MississippiRiver, from lower limits
of Memphis district to Warrenton, Miss., 210 miles on right bank
                     MISSISSIPPI RIVER COMMISSION                           1695
and 244 miles on left bank. Headquarters are at Vicksburg, Miss.
This district has charge of all Commission work on the Arkansas
River (south bank), Yazoo River, Ouachita River, and the north
bank of the Red River, as follows: On the south bank of the Arkan-
sas River to a point one-half mile downstream from Pine Bluff city
limits (adopted project limits, act May 15, 1928) ; on the Yazoo River
to the mouth of Wolf Lake above Yazoo City (backwater limit); on
the Ouachita River to vicinity of lock and dam no. 8, mile 330, above
mouth of Red River (backwater limit); and on the Red River to
Alexandria, La. (backwater limit), exclusive of works on the south
bank.
   Second district, Newo Orleans.-Mississippi River, Warrenton,
Miss., to Head of Passes, La., 461 miles. District headquarters are at
New Orleans, La. This district has charge of all Commission work
on south bank of Red River extending upstream as far as Boyce,
La., thence along Bayou Jean de Jean to Hotwell, La. (adopted
project limits, act May 15, 1928). This district has charge of all
Commission work in the Atchafalaya Basin.
                              PREVIOUS PROJECTS

  See page 1944, Annual Report for 1932.
                               EXISTING PROJECT

  The existing project is set forth in the Flood Control Act approved
May 15, 1928, and amendment approved June 15, 1936, published in
the Annual Reports of the Chief Engineers, United States Army,
for 1929, page 1924; and 1936, page 1679, respectively. Amendments
to the existing project are also contained in acts approved June 19,
1930, February 15, 1933, April 23, 1934, and August 28, 1937.
  The work proposed includes:
   1. Flood protection along the Mississippi River from Rock Island, Ill., to Head
of Passes, La., 1,552 miles, by the construction, extension, and repair of levees,
and in certain localities along the Mississippi River and alluvial valley, con-
struction of spillway, floodways, outlets, and reservoirs; and construction, ex-
tension, and repair of levees upon the tributaries and outlets of the Mississippi
River insofar as they may be affected by the backwater of the Mississippi River;
all in cooperation with the several States and levee boards.
  The essential features of the plan are as follows:
  Improvement and regularization of the Mississippi River.
  A floodway opposite Cairo, Ill., from Birds Point to New Madrid, Mo.
  Flood control of the St. Francis River, Mo., and Ark.
  An emergency reservoir at mouth of White River, Ark.
  Protection levees in the basins on the west side of the Mississippi River below
the Arkansas River to protect the better lands in these basins and prevent the
excess floodwaters of extraordinary floods leaving the main river near the
heads of the Tensas and Atchafalaya Basins from spreading over the entire
area of these basins.
  Flood control of the Yazoo River, Miss.
  A controlled spillway to hold flood levels down to safe stages at and near New
Orleans (Bonnet Carre spillway and floodway).
  An outlet to the Gulf of Mexico west of Berwick, La.
  Improvements of flow conditions on the Atchafalaya River and its outlets.
  2. Continuation of improvement below the mouth of the Ohio River so as to
"give safety and ease to navigation" on the Mississippi River at all stages by
facilitating the interchange of traffic, "commerce, trade, and the Postal Service,
with a view to securing a permanent channel depth of 9 feet" by means of-
     20196-37-pt. 1-107
1696      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    (a) Revetment of caving banks and contraction work to "correct, perma-
nently locate, and deepen the channel, and protect the banks of the Mississippi
River", and for the preservation of harbors and the security of levees.
    (b) Dredging, Cairo, Ill., to Baton Rouge, La., for the purpose of maintaining
at all stages a navigable channel 300 feet in width and 9 feet in depth, including
construction, operation, and maintenance of suitable dredge boats and auxiliary
devices and appliances therefor. Dredging is also carried on for the creation
and maintenance of harbors and connecting channels.
   3. The maintenance of a navigable channel between the waters of the Missis-
sippi, Red, and Atchafalaya Rivers.
   4. Physical investigations: Maintenance of gages; discharge measurements
of the Mississippi River and its tributaries; preparation and publication of
maps and physical data; surveys and investigations covering all phases of river
regimen governing the work of channel improvement and flood control "from
the headwaters of the Mississippi River to Head of Passes."
   5. Other miscellaneous details incident to the execution of the general project.

                 RECOMMENDED MODIFICATION OF PROJECT

  See page 1670, this report.
       REFERENCES TO PUBLISHED ARTICLES NOT PREVIOUSLY REPORTED


  See page 1671, this report.
                             LOCAL COOPERATION


   See page 1950, Annual Report for 1932, and page 1671, this report.
   The net total amount contributed for work under supervision of
the Mississippi River Commission to June 30, 1937 (including con-
tributions under sec. 7 of Flood Control Act approved May 15, 1928,
totaling $2,866.78), amounted to $20,817,223.06, of which $19,315.-
214.64 was for the old project and $1,502,008.42 for the new project.
Of the total contributed for the new project ($1,502,008.42), $1,496,-
240.96 was contributed for work paid for from regular United States
funds and $5,767.46 for work paid for from National Industrial Re-
covery Administration funds.
                            TERMINAL     FACILITIES

  See page 1673, this report.
OPERATIONS   AND RESULTS     DURING    FISCAL   YEAR AND     CONDITION    AT   END
                                OF FISCAL YEAR

    ~'urveys, gages, and observations. (See p. 1961, Annual Report for
1932).-Topographic and hydrographic surveys of the Mississippi
River have been made and charts published prior to fiscal year 1937.
   Surveys and reports required under sections 3, 6, and 7 of the May
15, 1928, act are made as required. Surveys required under section
11 of the Flood Control Act were completed in 1931 and reports sub-
mitted. During fiscal year 1937 surveys were continued in connec-
tion with construction work in carrying out the provisions of the
flood-control project.
   Floodway, levee, revetment, dike, and construction surveys were
made as required; surveys were made over important works and
along caving banks. Completion surveys were made over all levees
completed during the year. In the Memphis district surveys were
completed on proposed Mississippi River levee project from Old-
                       MISSISSIPPI RIVER COMMISSION                           1697
town, Ark. (325)2 to Laconia Circle, Ark. (374); the levee surveys
on the St. Francis and Little Rivers are 85 percent complete (Octo-
ber-June 15, 1936); general hydrographic surveys Mississippi River
were made from Henderson Point Landing to head of Island 8
 (miles 40-44), also included chute of Island 8, Finley Bar to Bor-
deaux Point (miles 258-276), St. Francis Bend to Oldtown Bend
 (miles 300-325); levee and crevasse surveys were made on the Birds
Point-New Madrid front line levee from Birds Point, Mo., to Conran
dike; a record of the limits of the January-February 1937 flood be-
tween Mounds, Ill., just above Cairo, Ill. (0.0), and Laconia Circle,
Ark., was obtained by the use of aerial photography. In this survey
the flights were made in such a manner as to completely outline the
overflow limits at the crest. In the Vicksburg district the perma-
nent ranges for channel realinement and cut-off studies were sounded
at low-water, mid-bank, and bank-full stages during the year; third-
order control, topographic, drainage, and levee location surveys were
made of the Eudora floodway area; appraisals by the Department
of Agriculture and Forestry Service and taking options was begun
of the Eudora floodway area in Arkansas and Louisiana; an aerial
survey covering 1,730 square miles in the Eudora floodway in Louisi-
ana was made; high-water profiles were made of 1937 high water
on Mississippi and Arkansas Rivers; seepage observations were made
on 17 test sections of Mississippi River levees; sketches were made
of the backwater area of the Yazoo and Red Ouachita areas for 1937
high water.
   In the second New Orleans district comparison of available cross-
section elements of the 1935-36 hydrographic survey of the Missis-
sippi River, Carr Point (771)2 to the Forts (1050), with those of
1921 and previous surveys was continued; the hydrographic survey
of the Mississippi River below Carr Point (771) was continued from
Point Menoir (818) to below Plaquemine, La. (863), and from Don-
aldsonville (895) to St. Rose (952) (vicinity of Bonnet Carre spill-
way); a low-water survey was made on the Mississippi River from
Vicksburg (602) to Old River (772); a hydrographic survey was
made on the Atchafalaya River from Melville to Grand Lake; sur-
veys were made for the proposed outlet west of Berwick, La.; post-
operation surveys were made in the Bonnet Carre spillway and in
Lake Pontchartrain in the vicinity of the spillway. Precise levels
were run from Bayou Chene to Keel Boat Pass in the Atchafalaya
Basin. Several short lines of precise levels were run and tied in with
the existing precise levels on the west bank of the Mississippi River
from below Vicksburg, Miss., to Vidalia, La. (706). A precise river
crossing was made at Natchez, Miss. (706). Numerous soil borings
were made in connection with construction work. Sediment observa-
tions were made during the 1936 low water on the Mississippi, Old,
and Atchafalaya Rivers. Salinity surveys were made in the vicinity
of the proposed outlet west of Berwick, La.; and salinity and sedi-
ment observations were made in Lake Pontchartrain and vicinity
prior to, during, and subsequent to the operation of the Bonnet Carre
spillway. Aerial photographs were obtained in connection with the
Bonnet Carre spillway operation at the spillway and along the Lake
Pontchartrain shore line; aerial photographs were also obtained in
  SFigures in parentheses denote distance in miles below Cairo, Ill., gage.
1698      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the vicinity of the proposed outlet west of Berwick, La., and of the
Atchafalaya Basin (main channel); other aerial photographs were
made in connection with the completion of the drafting of several
quadrangles. Appraisals were made by representatives of the United
States Department of Agriculture and the United States Forest
Service in the proposed Morganza floodway, in the West Atchafalaya
Basin (above approximate latitude of Krotz Springs, La.) ; and over
territory covered by three alternative locations of the proposed outlet
to the Gulf of Mexico west of Berwick, La.
   Numerous special surveys and observations on discharge, velocity,
and direction of flow were made in connection with the development
of cut-offs at Caulk (406-422)2 opened May 13, 1937; Ashbrook
 (444-456); Tarpley (461-472) ; Leland (472-484); Worthington
 (506-513); Sarah (518-526); Willow (564-578); Marshall (587-
593) in the Vicksburg district; Diamond (614-626); Yucatan (638-
648); Rodney (664-672) ; Giles (690-704); and Glasscock (723-737),
on the Mississippi River; at Alabama Bayou (Whiskey Bay pilot
channel and extension); Blind Tensas (Blind Tensas-Logan Chute
pilot channel); Bayou Chene and Chicot Pass; on the Atchafalaya
River and Basin and at other channel-rectification works in the
Atchafalaya Basin in the second New Orleans district. A system
of special gages was read in connection with the surveys and observa-
tions. Aerial surveys were made of the cut-offs on the Mississippi
River and in the Atchafalaya Basin.
    Gages have been established and maintained at various places on
the Mississippi River and tributaries and outlets, and on Lake Pont-
chartrain, and the Gulf of Mexico; and readings published from ear-
liest records to 1934. During the year the regular gages on Missis-
sippi River and tributaries and outlets, and on Lake Pontchartrain,
gages in backwater areas, Biloxi tide gage in Gulf of Mexico, and
high- and low-water gages on Mississippi River were maintained. In
the Memphis district special gages were maintained to obtain general
low-water slopes. The regular gages, high-water and low-water and
backwater gages, together with levee and floodway gages, were read
during the year in all districts; special gages established in connec-
tion with cut-off observations and channel-realinement studies were
read. Gages established in the Old River lakes and Tensas Basin by
the second New Orleans district were maintained and read.
    In the St. Louis district a controlled aerial photo-mosaic map, scale
1 : 12,000, of the Mississippi River flood plain between the mouths
of Ohio and Missouri Rivers was practically completed.
    Discharge and other observations on Mississippi River and tribu-
taries at various stations are made each year and the results have
been published for 1838 to 1934. Physical data are compiled and
card-indexed. Discharge, slope, and sediment observations were
taken at selected stations on the Mississippi River and tributaries
from September 1928 to June 1929, and the results published. A
series of measurements of current velocity at each tenth of sounded
depth from surface to the bottom were also made at each station.
During the fiscal year 1937 discharge observations were made at 12
regular stations on the Mississippi River and at 12 regular stations
on tributaries and outlets. Discharge observations were also taken
  2 Figures in parentheses denote distance in miles below Cairo, Ill., gage.
                                       MISSISSIPPI RIVER COMMISSION                                                            1699
at other selected locations in the lower alluvial valley of the Mis-
sissippi River; sediment observations were also made at some stations.
   The costs and net expenditures for surveys, gages, and observations
during the 12 months ending June 30, 1937, were as follows:

                                                                                               Regularfunds National Recovery Ad-
                                                                                        Reular funds         ministration funds
                                 District

                                                                                      Costs       Net ex-       Costs       Net ex-
                                                                                                 penditures                penditures

Rock Island....    ------------------------------------- $837. 23                  $627.                 55 --
St. Louis....--------------------------------------24, 136. 98                  21, 311.                 69--------------------
Memphis-..... ------------------------------------
                                                .           217, 607. 34 213, 953.                       62
Vicksburg ...                                     ..------------------------------------
                                                            187, 202. 16 177, 767.                       30 -
Second New Orleans-------       --------------------- 158, 784. 84 158, 801.                             24 .

      Total-................-------------.................---------------------..   588,568.55   572, 461.40 ------------ ------



   The net expenditures for surveys, gages, and observations to June
30, 1937, amounted to $8,412,809.54, of which $4,194,135.65 was ex-
pended on the new project and $4,218,673.89 on the old project. Of
the total expended on the new project ($4,194,135.65), $4,184,135.65
was expended from regular funds and $10,000 from National In-
dustrial Recovery Administration funds.
   Alluvial valley mapping.-Contoured maps, alluvial valley, lower
Mississippi River, scale 1:250,000, of the St. Francis, Yazoo-Tensas,
and Atchafalaya-Pontchartrain Basins were published in 1929, and
upon completion of revision in 1934 new maps were published; a con-
toured map, scale 1: 500,000, of the alluvial valley, lower Mississippi
River, from Cape Girardeau, Mo., to Gulf of Mexico, was published
in 1931, and upon completion of revision was published as edition
1935. Data relative to existing maps were collected and surveys made
during 1929 to 1933 for use in the publication of a contoured map of
the alluvial valley, lower Mississippi River, on a scale of 1: 62,500.
Of the 1851/2 quadrangles originally authorized for this map under
the alluvial-valley mapping project, and 17 quadrangles later author-
ized, 1723/4 quadrangles were assigned the War Department (Missis-
sippi River Commission). These quadrangles have been completed
and forwarded to the printer for reproduction, all of which have
been printed as advance sheets, scale 1: 62,500, thus completing the
quadrangle mapping required under the May 15, 1928 act, assigned
to the War Department; the area covered by the 1723/ quadrangles
assigned to the War Department is available on 177 sheets; the pro-
cess of editing and correcting the printed advance sheets was con-
tinued during the fiscal year 1937; and 94 whole or portions of
quadrangles are now available as published editions (on 98 sheets).
Of the 2021/2 quadrangles within the alluvial valley map, 293/ quad-
rangles were assigned for mapping to the Geological Survey for the
War Department, which have been completed for reproduction, and
are available as advance printed sheets, scale 1: 48,000; 27 of the
quadrangles are available as published sheets, scale 1: 62,500 (on 27
sheets).
   Work on the preparation of four additional quadrangles in the
second New Orleans district of areas adjacent to quadrangles already
1700      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

completed along Lake Pontchartrain, to a scale of 1: 48,000, was
completed and maps forwarded to the printer for reproduction.
    There were no expenditures nor costs for alluvial-valley mapping
incurred during the 12 months ending June 30, 1937. The net ex-
penditures for alluvial-valley mapping (all new project) to June
30, 1937, amounted to $1,223,822.93, which includes $362,927.81 trans-
ferred to Department of the Interior, Geological Survey Office, for
direct expenditure by that office.
    General stage of the Mississippi River during the 12 months ending
June 30, 1937.-Unusually low stages prevailed on the Mississippi
River during the first half of the fiscal year 1937, followed by ex-
tremely high stages during January-March, 1937, with moderate
stages prevailing for the remainder of the fiscal year. The stages
exceeded bankfull on gages as follows: Cairo (0.0), January 14 to
February 24, and May 6 to 13, 1937; Memphis (227),2 January 19 to
March 2, and May 12 to 18, 1937; Helena (307), January 19 to March
7, and May 11 to 22, 1937; Arkansas City (438), January 29 to
March 5, 1937; Greenville (480), January 27 to March 9, 1937;
Vicksburg (602) (canal gage), January 27 to March 15, 1937;
Natches (706), January 31 to March 18, 1937; Angola (771), Janu-
ary 30 to March 24, 1937; Baton Rouge (842), Janunary 25 to March
30, and May 22 to 28, 1937; Donaldsonville (895), January 27 to
March 28, 1937; Carrollton (967) (New Orleans), January 20 to
April 9, and May 11 to June 2, 1937. The 1937 crest stage was from
2.1 to 6.3 feet above the all-time high stages on all gages from Cairo
 (0.0) to Sunflower Landing (354) and at Mouth of White River
 (393) it was 2.35 feet below the 1927 crest. From Arkansas City
 (438) to Fort Jackson (1051) the crest stages were from 3.5 feet
above to 5 feet below the 1929 crest stages. The stages from Cairo to
New Madrid, Mo. (71) were affected by the operation of the Birds
Point-New Madrid floodway between January 25 and March 5, 1937,
and from Bayou Sara, La. (807) to the Gulf of Mexico, La. (1070)
by the operation of the Bonnet Carr6 spillway and floodway from
January 29 to March 17, 1937.
    The following gives a general outline of the stages at principal
gaging stations, Mississippi River from Cairo, Ill., to Carrollton, La.
   The stage of the Mississippi River was above 20 feet on the Cairo
gage (0.0), November 6 to 18, 1936, and January 1 to June 30, 1937,
totaling 194 days; above 30 feet January 5 to March 5, 14 to 17, and
April 26 to May 22, 1937, totaling 91 days; above 40 feet January
10 to February 27 and May 4 to 16, 1937, totaling 62 days; above 50
feet January 21 to February 18, 1937, totaling 29 days; the highest
reading for the 12 months ending June 30, 1937 was 59.51 feet, on
February 4, 1937, and the lowest reading, 5.1 feet, on August 22, 1936.
   At Memphis (227),2 gage readings were below mean low water 3.1
feet, July 31 to August 1, 4 to September 24, 1936. The highest read-
ing for the 12-month period was 50.4 feet, on February 9, 1937, and
the lowest 0.0 feet, on August 25, 1936.
   At Vicksburg (602) (canal gage) the highest stage for the fiscal
year, 55.5 feet, was recorded on February 21 and 22, 1937, and the
lowest, -3.1 feet, August 30 to September 2, 1936.
2 Figures in parentheses denote distance in miles below Cairo, Ill., gage.
                  MISSISSIPPI RIVER COMMISSION                  1701
   The stage of the Mississippi River was above 10 feet on the Angola
gage (771), October 7 to 14, 17 to 26, November 11 to 30, December
16 to 31, 1936, and January 1 to June 30, 1937, totaling 235 days;
above 20 feet January 9 to June 30, 1937, totaling 173 days; above
30 feet January 15 to April 13, May 5 to June 4, 1937, totaling 120
days; above 40 feet January 26 to March 28, 1937, totaling 62 days;
and above 50 feet February 8 to March 16, 1937, totaling 37 days.
The highest reading for the 12-month period was 55.50 feet on
February 27 and 28, 1937; and the lowest reading, 1.8 feet, Septem-
ber 1 to 5, 1936.
   The highest stage on the Carrollton gage (967) during the 12-
month period was 19.29 feet, on February 28, 1937, and the lowest,
0.85 foot, on December 12, 1936.
   Dredges and dredging.-When it became apparent that channel
improvement by contraction works could not meet the pressing needs
of commerce within a reasonable time limit, experiments were com-
menced looking to channel maintenance during low water by means
of hydraulic dredges of large capacity. The development of an
efficient dredge to operate in an open channel exposed to shifting
winds and the river currents, that would quickly open a cut through
the crest of a sand bar from one pool to the next, required a great
deal of experimental work, covering not only the hydraulic and
mechanical details but also the practical manipulation of the dredge
under the conditions imposed. A long series of experiments was
made to determine the best form of suction head; the economic
size of suction and discharge pipes; the velocity of flow in these
pipes; the percentage of material that could be pumped and deliv-
ered; the best type of pump, number and shape of blades, speed of
pump impellers; anchor piles and hauling cables; pontoons for sup-
porting the discharge pipes, etc. The proper manipulation required
an intimate knowledge of sand-bar formation and the trend of the
current between successive pools, which could only be gained by
hydraulic experiments and by long-time contact with the problem.
A new problem in channel adjustment was introduced during the
fiscal year 1932 by the construction of permeable pile dikes as ex-
plained in more detail under Bank Protection and Regulation,
page 1713.
   As each new dredge was built an effort was made to eliminate
the defects of its predecessors. The two newest dredges, Jadwin and
Burgess, completed in February and March 1934, dig a cut 10 feet
deep and 32 feet wide through a sand bar at the rate of 600 feet per
hour. These two dredges can operate at a depth of 40 feet and have
sufficient boiler power to operate propelling and pumping machinery
at the same time. Although the dredges Jadwin and Burgess are of
the most satisfactory types of hydraulic dredges for Mississippi
River channel maintenance yet developed, studies, experiments, and
improvements are still under way. Several of the larger channel-
maintenance dredges have been converted temporarily, and for ex-
perimental purposes, by the replacement of the conventional "dust-
pan" type of suction head with a long single suction pipe of the bell
head type. Under these changes dredging can be carried on to depths
up to 80 feet, which makes possible certain dredging operations
during normal high-water stages of the river.
1702        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Five channel dredges, five pump barges, and nine cutter-head
dredges (including five privately owned) are available for use dur-
ing the low-water season covering about 6 months each year. In
addition other cutter-head dredges (privately owned) are available
for channel dredging in case of emergency.
   A total of over 145,034,071 cubic yards has been dredged in channel
maintenance on the Mississippi River during the past 9 years.
   The present law requires the maintenance of a channel not less
than 9 feet in depth and 300 feet in width at all stages of the river
except when closed by ice. A navigable channel has been main-
tained since 1895, and a channel of project dimensions has been
maintained since 1902, except as follows:
   For 18 days in 1903 and a few days in 1904 the depths at 1 bar
were 8 and 81/2 feet. For a few days there was a depth of between
8 and 9 feet at 5 bars in 1908, 7 bars in 1910, 5 bars in 1914, 2 bars in
1916, 1 bar in 1917, 1 bar in 1920, 6 bars in 1922, 1 bar in 1924, 4 bars
in 1925, 4 bars in 1927, 19 bars in 1930, 14 bars in 1931, and 26 bars
in 1933. For a few days there was a depth of between 7 and 8 feet
at 1 bar in 1908, 1 bar in 1921, 8 bars in 1924, 12 bars in 1925, 1 bar
in 1927, 11 bars in 1930, and 8 bars in 1931. For a few days at 1 bar
in 1913, 4 bars in 1916, 3 bars in 1918, 1 bar in 1919, 2 bars in 1920, 5
bars in 1921, 8 bars in 1922, 2 bars in 1923, 7 bars in 1924, 7 bars in
1925, 7 bars in 1927, 5 bars in 1930, 1 bar in 1931, and 1 bar in 1933,
the required width was not fully maintained. A channel of project
depth and width was maintained during the low-water seasons of
1926 and 1928. The project depth was fully maintained except at 9
bars in 1929, at 32 bars in 1930, at 14 bars in 1932, and at 28 bars in
1933. The low-water season of 1930 covered the longest low-water
period of record, extending over practically the entire year. For a
few days there was a depth of between 61/2 and 81/2 feet at 1 bar in
1930 and 1 bar in 1931; a depth of 6 feet at 1 bar in 1932; a depth of
between 7 and 81/2 feet at 3 bars, and a depth of between 71/2 and 8
feet at 2 bars in 1933; a depth of between 8 and 81/2 feet at 11 bars
in 1934; and a depth of between 8 and 81/2 feet at 11 bars in 1935.
For a few days there was a depth of 8.5 feet at 3 bars, 8 feet at 12
bars, 7.5 feet at 2 bars, and 7 feet at 2 bars. The Cairo gage was
at unusually low stages during this period, remaining below mean
low water from August 1, 1936, until September 3, 1936; a stage of
3.5 feet below mean low water on August 22, 1936, was reached. A
shortage of dredging plant was created by the sinking of 2 dredges
in 1929, which were replaced in 1932, and the sinking of 1 dredge
and the condemning of 1 dredge in 1933, which were replaced in 1934.
                                   MEMPHIS      DISTRICT


  Mississippi River.-During the fiscal year ending June 30, 1937,
seven dredges and one sand and gravel dredge were operated on
the Mississippi River, in the Memphis district, from Williams (27) i2
to Sibley Chute (388). A total of 41,652,102 cubic yards of material
was moved at a cost of $1,855,844.37. The above work (which does
2   Figures in parentheses denote distance in miles below Cairo, Ill., gage.
                       MISSISSIPPI RIVER COMMISSION                           1703

not include Memphis Harbor and Wolf River work) was divided as
follows :
   Channel maintenance and improvement dredging: During the sea-
son of 1937, ending June 30, 1937, seven dredges and one sand and
gravel dredge were operated in the Mississippi River in the Memphis
district, from Williams (27) to Sibley Chute (388). A total
of 40,351,826 cubic yards of material was moved, at a cost of
$1,653,098.63.
  .(a) Channel maintenance dredging: Seven dredges and one sand
and gravel dredge were operated on 53 crossings from Williams (27)
to Sibley Chute (388), moving a total of 31,069,025 cubic yards of
material, at a cost of $1,120,154.59.
   (b) Improvement dredging: Six dredges were operated at Hick-
man vicinity (33-35), Chute of Island 8 sand dike (44) 5, Point Pleas-
ant (77-82), Island 30 vicinity (155-168), Island 35 vicinity (195-
200), and Cessions (365-375).         Two million two hundred and
twenty-three thousand two hundred and ninety-seven cubic yards of
material were moved at Hickman vicinity, at a total cost of $88,
588.43; 517,314 cubic yards of material were moved at Chute of
Island 8 sand dike, at a total cost of $85,712.27; 136,040 cubic yards
of material were moved at Point Pleasant, at a total cost of $45,-
700.27; 2,228,717 cubic yards of material were moved at Island 30
vicinity, at a total cost of $85,628.79; 772,107 cubic yards of mate-
rial were moved at Island 35 vicinity, at a total cost of $30,078.55;
3,405,326 cubic yards of material were moved at Cessions, at a total
cost of $197,235.73.
   Miscellaneous dredging : Two dredges moved 1,300,276 cubic yards
of material in connection with levee restoration, with cost as shown
below:
   (a) Levee work: One dredge made a hydraulic fill at Pritchard
Landing (8)2, pumping 216,370 cubic yards of material, at a total
cost of $50,264.34 for the dredge only.
   (b) Levee work: Two dredges made a hydraulic fill at Wolf
Island (25), pumping 1,083,906 cubic yards of material, at a total
cost of $152,481.40 for the dredges only.
   Memnphis Harbor and Wolf River, Tenn.-Maintenance dredging
accomplished at these locations during the fiscal year consisted of
moving 255,236 cubic yards of material by one dredge, for a total
cost of $28,836.75. The work is reported in the annual report of
the Memphis district (river and harbor work).
                                 VICKSBURG DISTRICT

  Mississippi River.-During the fiscal year ending June 30, 1937,
three pump barges, three cutterhead dredges, one dustpan dredge and
one agitator dredge were operated in the Vicksburg district from
Caulk Neck (406)2 to Racetrack (610). A total of 13,421,865 cubic
yards of material was moved at a total cost of $1,067,821.99. (Yard-
age and cost do not include cut-off dredging and operation, Green-
2 Figures in parentheses denote distance in miles below Cairo, Ill., gage.
  SDike washed out in January-February 1937 flood.
1704      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

ville dike dredging and operation, and sewer system, nor miscella-
neous dredging.) The above work was divided as follows:
   Channel maintenance dredging: One pump barge was operated at
Caulk Point (413), moving a total of 605,351 cubic yards. One
pump barge was operated at O'Bannon Point (430), moving a total
of 149,270 cubic yards. One pump barge was operated at Refuge
 (495), moving a total of 304,534 cubic yards. One pump barge was
operated at Princeton (515), moving a total of 89,891 cubic yards.
The cost of dredging at these locations was $68,139.32. No other
channel dredging was necessary in the Vicksburg district. Surveys
of river crossings were made during low stages and channel lines at
crossings were marked by buoys, at a cost of $88,476.88. (Not in.
cluded in total cost of dredging.)
   Harbor dredging: Two pump barges, one dustpan dredge, and one
cutterhead dredge were operated at Greenville Harbor (483), moving
a total of 1,454,738 cubic yards at a cost of $118,023.94. One pump
barge was operated at the Yazoo Diversion Canal moving a total of
22,114 cubic yards at a cost of $14,390.60.
   Corrective dredging: Two pump barges operating at Miller Bend
 (458), to aid in channel alinement, moved a total of 1,678,300 cubic
yards at a cost of $77,331.07. One pump barge and one cutterhead
dredge operating at Cracraft Chute (515), to improve and aid in
development of chute channel, moved a total of 2,018,494 cubic yards
at a cost of $152,623.22. Two cutterhead dredges and one pump
barge operating at Opossum Chute (527), opening chute channel,
moved a total of 3,366,040 cubic yards, of which 426,000 were dredged
and placed in a sand dike, at a cost of $368,819.70. One pump barge
operating at King's Point (598),2 improving channel, moved a total
of 860,390 cubic yards at a cost of $39,198.05. One pump barge
operating at Lower Racetrack (608), improving channel alinement,
moved a total of 349,793 cubic yards at a cost of $18,094.77.
   Contraction (sand dikes) : Two pump barges and two cutterhead
dredges operating at Racetrack Towhead (605), rebuilding sand dike
to close entrance to bendway channel, moved a total of 2,034,384 cubic
yards at a cost of $197,810. One cutterhead dredge operating at
Opossum Chute (530), building sand dike to stop flow between
Duncansby Towhead and Wildcat Towhead, moved a total of 426,000
cubic yards at a cost of $18,386.47; yardage and cost included in work
shown under "Corrective dredging' for Opossum Chute.
   Agitation dredging: One agitator dredge was operated at Lower
Racetrack (610), improving channel flow, a total of 488,566 cubic
yards moved at a cost of $13,391.32.
   Miscellaneous dredging: At Greenville dike (475) during the fiscal
year ending June 30, 1937, three pump barges, two cutterhead dredges,
and one dustpan dredge were operated moving 14,785,192 cubic yards,
of which 1,431,538 cubic yards were dredged in connection with relo-
cation of channel in Greenville Harbor and 1,795,373 cubic yards were
dredged in connection with restoration due to high water. The total
cost was $872,651.06.
   Dredging in connection            with
                                    cut-offs, Mississippi River.-During
the fiscal year ending June 30, 1937, one new cut-off, Caulk (40-422),
was made by dredging. Dredging to produce cut-offs and to de-
  2 Figures   in parentheses denote distance in miles below Cairo, Ill., gage.
                        MISSISSIPPI RIVER COMMISSION                        1705
velop cut-offs already open was carried on at four points. The plant
used consisted of three cutterhead dredges and two pump barges.
Total material moved by dredging during fiscal year 1937 amounted
to 6,983,101 cubic yards not including 49,437 cubic yards moved by
levee machine. Operations were as follows:
   Caulk cut-off (406-422) :2 Was begun April 21, 1937, and opened
May 13, 1937. A total of 1,506,610 cubic yards was moved by two
cutterhead dredges and 49,437 cubic yards by one levee machine; the
latter amount not included in dredging totals. The cut was ap-
proximately eight-tenths of a mile long. On June 23, 1937, 19,800
cubic feet per second, or 3 percent of total river discharge, was pass-
ing through the cut. The total cost was $183,885.78, of which
$29,961.57 was for right-of-way and clearing.
   Ashbrook cut-off (444-456) : Was opened November 19, 1935. Dur-
ing the fiscal year ending June 30, 1937, no dredging was necessary.
The cut was approximately 1 mile long. At stages of less than 17
feet on the Greenville gage the cut-off carries the entire river dis-
charge. On February 18, 1937, near the peak of the 1937 high water
1,807,000 cubic feet per second, or 87 percent of the total river dis-
charge, was.passing through the cut-off. During the fiscal year 1937
the cost was $8,309.02 for right-of-way.
   Tarpley cut-off (461-472) : Was opened April 21, 1935. The cut is
approximately 3 miles long. During the fiscal year ending June 30,
1937, no dredging was necessary. On February 17, 1937, near the peak
of the 1937 high water 1,327,000 cubic feet per second or 62 percent
of the river discharge was passing through the cut-off; the maximum
discharge occurred a few days later with a flow of 1,345,000 cubic
feet per second through the cut-off. On June 9, 1937, 430,000 cubic
feet per second or 88 percent of the river discharge was passing
ithrough the cut-off. During the fiscal year 1937 the cost was $296.10
for right-of-way.
   Leland cut-off (472-483): Was opened July 8,1933. The cut is
approximately eight-tenths of a mile long. During the fiscal year
ending June 30, 1937, no dredging was necessary. Greenville dike
confines all flow at any stage to the cut-off. During the fiscal year
1937 the cost was $2,250.36 for right-of-way. Observations indicate
flow of 2,160,000 cubic feet per second through the cut-off near peak
of 1937 high water.
   Worthington cut-off (506-513) :2 Was opened December 22, 1933.
The cut was approximately 3.8 miles long. One pump barge was
operated during the fiscal year ending June 30. 1937, to improve and
develop the cut, moving a total of 1,055,223 cubic yards at a cost of
$50,948.66. On February 10, 1937, near the peak of the 1937 high
water, 749,000 cubic feet per second, or 37 percent, of the river dis-
charge was passing through the cut-off; the maximum discharge oc-
curred a few days later with a flow of 787,000 cubic feet per second.
On June 22, 1937, 240,000 cubic feet per second, or 40 percent, of the
river discharge was passing through the cut-off.
   Sarah cut-off (518-527) : Was opened March 23, 1936. The cut-off
was approximately 3.2 miles long. Due to filling of cut and low-river
stage there was no flow through cut from July 23, 1936, to October
2, 1936. During the fiscal year ending June 30, 1937, two cutterhead
2   Figures in parentheses denote distance in miles below Cairo, Ill.,
                                                                     gage
1706        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

dredges and two pump barges were operated, moving a total of
3,771,268 cubic yards, reopening and enlarging the cut at a total cost
of $286,334.06, of which $27,447 was for right-of-way. On February
11, 1937, near the peak of the 1937 high water, 516,000 cubic feet per
second, or 25 percent, of the river discharge was passing through the
cut-off; the maximum discharge occurred a few days later with a flow
of 550,000 cubic feet per second. On June 23, 1937, 252,000 cubic
feet per second, or 42 percent, of the river discharge was passing
through the cut-off.
   Willow cut-off (564-578): Was opened April 8, 1934. The length
of the cut was approximately 4.7 miles. During the fiscal year ending
June 30, 1937, one cutterhead dredge was operated to improve and
develop the cut and moved a total of 650,000 cubic yards at a cost of
$62,358.14. On February 24, 1937, near the peak of the 1937 high
water, 1,101,000 cubic feet per second, or 56 percent, of the river dis-
charge was passing through the cut-off, being the maximum discharge.
On June 24, 1937, 528,000 cubic feet per second, or 79 percent, of the
river discharge was passing through the cut-off.
   Marshall cut-off (587-593):2 TWas opened March 12, 1934. The
length of the cut was 3.1 miles. During the fiscal year ending June
30, 1937, no dredging was necessary in the cut-off. On February 17,
1937, near the peak of the 1937 high water, 940,000 cubic feet per
second, or 47 percent, of the river discharge was passing through the
cut-off, being the maximum discharge. On June 23, 1937, 532,000
cubic feet per second, or 81 percent, of the river discharge was passing
through the cut-off. The cost during the fiscal year 1937 was $2,903.24
for right-of-way.
  As a result of cut-offs a new outfall sewer was required at Green-
ville, Miss., cost of which was $246.267.09 during the fiscal year 1937
from dredging funds.
   The total cost of dredging operations in connection with cut-offs in
the Vicksburg district was $597,285.36 for the fiscal year ending June
30, 1937, which includes $71,167.29 for right-of-way and clearing; the
1937 cost of sewer is not included. All the cut-offs in the Vicksburg
district are used by river traffic at all stages, with the exception of
Caulk, which has not had time to develop.
                           SECOND DISTRICT, NEW           ORLEANS


  Mississippi River and Atchafalaya Basin.-During the fiscal year
ending June 30, 1937, 11 hydraulic cutterhead dredges, 2 self-pro-
pelled agitator dredges and 4 pump barges were operated on the
Mississippi River and in the Atchafalaya Basin, removing a total of
72,238,222 cubic yards of material at a cost of $5,541,211.90. The
work was divided as follows:
   Channel maintenance dredging, Mississippi River: There was no
channel maintenance dredging during the fiscal year 1937. Surveys
of river crossings were made at low stages and channel line marked
by buoys where necessary.
   Channel stabilization dredging, Mississippi River: Two agitator
dredges, four pump barges, and three cutterhead dredges were used
to remove 26,742,589 cubic yards of material from bars and crossings
  2   Figures In parentheses denote distance in miles below Cairo, Ill., gage.
                         MISSISSIPPI RIVER COMMISSION                           1707
between Warrenton, Miss. (610),2 and Smithland crossing (772), at
a cost of $1,716,982.75. The work was divided as follows: Racetrack
Towhead (610), 488,568 cubic yards; Newtown Bend (626-633), 5,026,-
366 cubic yards; Thrasher Point (633), 398,400 cubic yards; Buck-
ridge crossing (635), 20,300 cubic yards; Brooks crossing (636),
2,606,724 cubic yards; Grand Gulf crossing (648-650), 264,710 cubic
yards; White Hall crossing (651-653), 214,490 cubic yards; Hard-
scrabble Bend (654-656), 963,125 cubic yards; Bondurant Chute
 (657-659), 2,477,813 cubic yards; Waterproof crossing (676-678),
2,581,118 cubic yards; Rifle Point (684-690), 2,779,604 cubic yards;
Waverly Point (704), 1,722,015 cubic yards; Carthage Point (708-
710), 3,880,075 cubic yards; Natchez Island (709-713), 852,536 cubic
yards; Fords crossing (715-717), 262,188 cubic yards; Esperance
crossing (718-721), 1,309,933 cubic yards; Smithland crossing (772),
894,624 cubic yards.
   Dredging in connection with contraction works (sand dikes), Mis-
sissippi River: The construction of sand dikes to assist in creating and
maintaining a satisfactory channel for both navigation and flood flow
was made at eight locations in the district. The work consisted in
confining the major flow of the river in a channel of normal width
at both high and low stages by closing minor side channels. The
dredges engaged in this work consisted of two pump barges and three
cutterhead dredges. A total of 16,846,456 cubic yards of material
was placed at a cost of $1,160,414.42. Operations were as follows:
   Newtown Bend (626-633)2: One cutterhead dredge and two pump
barges were engaged in construction of sand dikes at three locations
in Newtown Bend, placing a total of 3,210,920 cubic yards of material
as follows: Kellogg Lake dike (626) was completed and reinforced
during the fiscal year with a placement of 2,442,960 cubic yards. A
total of 2,500 linear feet was constructed. At mile 629 one sand dike
was built and one is under construction near the left bank; 1,400 linear
feet of dike were built and 636,290 cubic yards of material were
placed. At mile 630.5 one sand dike was under construction near
the right bank on June 30, 1937; 131,670 cubic yards of material
were placed.
   Buckridge crossing-Brooks crossing (635-637): Three cutterhead
dredges were engaged in construction of four sand dikes in this reach,
placing 7,272,603 cubic yards of material. Three of these dikes were
contraction dikes on the two crossings, connecting with the left bank
and having an aggregate length of 9,300 feet. A total of 4,322,253
cubic yards was placed. The fourth dike was built across the old
river just above the head of Yucatan cut-off. It was 2,800 feet long
and 2,950,350 cubic yards of material were placed.
   Grand Gulf crossing (648-6'51) : One cutterhead dredge was used to
construct one dike near the right bank, 4,500 feet long, containing
1,174,996 cubic yards of material.
   Hardscrabble Bend (654): One cutterhead dredge was used to
construct seven dikes near the left bank, including five parallel spur
dikes. The total length of these dikes was approximately 9,800 feet.
A total of 2,107,253 cubic yards of material was placed in their
construction.
  2Figures   in parentheses denote distance in miles below Cairo, Ill., gage.
1708        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Waterproof crossing (676-678)2: One pump barge began construc-
tion of a low-water dike on Waterproof crossing bar on June 30, 1937;
2,949 cubic yards were placed during the fiscal year.
   Natchez Island (709-713): One pump barge was used to reinforce
the existing Natchez Island chute dike during the fiscal year, placing
17,670 cubic yards of material.
   Esperance crossing (719): One cutterhead dredge completed con-
struction of the left bank, Esperance. dike, which was 3,050 feet long.
During the fiscal year 2,687,075 cubic yards of material were placed.
   Waverly Point (704) : One cutterhead dredge was used to fill a cave
 (caused by high water) near the west bank levee which was classed
as contraction dredging; 372,990 cubic yards were placed.
   Dredging in connection with cut-offs, Mississippi River: Dredging
for the purpose of enlarging the existing cut-offs and therefore accel-
erating their development was done at three points in this district.
The plant used consisted of two agitator, two cutterhead dredges, and
one pump barge. A total of 3,374,716 cubic yards of material was
moved at a cost of $437,227.79. Operations were as follows:
   Diamond cut-off (614-626) : Opened January 8, 1933. No dredg-
ipg required during the fiscal year 1937. Near the peak of the 1937
high water the discharge through the cut-off was 984,000 cubic feet
per second. On April 21, 1937, the discharge through the cut-off
was 320,448 cubic feet per second, or 65 percent of the total river
discharge.
   Yucatan cut-off (638-648) : Occurred in fall of 1929. No dredging
was done in fiscal year 1937. Due to the dike constructed across old
river the cut-off carries approximately 100 percent of the river dis-
charge at a medium stage. Near the peak of the 1937 high water'
the discharge through the cut-off was 1,292,000 cubic feet per second.
   Rodney cut-off (664-672)2: Opened February 29, 1936; one cutter-
head dredge and one agitator were used during the fiscal year to
remove shoals at the head of the cut; 653,845 cubic yards were re-
moved. Near the peak of the 1937 high water the discharge through
the cut-off was 264,000 cubic feet per second. The 1937 high water
materially enlarged the channel. O'n April 26, 1937, the discharge
through the cut-off was 167,521 cubic feet per second, or 37 percent
of the river discharge.
   Giles cut-off (690-704): Opened May 25, 1933; was opened to
traffic on October 6, 1934. One agitator and one pump barge were
used during the fiscal year to remove a shoal at the head of the. cut;
1,014,672 cubic yards of material were removed. Near the peak of
the 1937 high water the discharge through the cut-off was 702,000
cubic feet per second. The discharge on April 23, 1937, was 268,954
cubic feet per second, or 55 percent of the total river discharge.
   Glasscock cut-off (723-737) : Was first opened for high-water flow
March 26, 1933. In succeeding years the channel was enlarged by
dredging. In fiscal year 1937 one cutterhead and one agitator were
used enlarging constricted reaches, dredging 1,706,199 cubic yards of
material. Near the peak of the 1937 high water the discharge
through the cut-off was 376,000 cubic feet per second. On June 30,
1937, there existed a low-water channel 30 feet deep; the channel was
carrying 24 percent of the total river discharge.
2Figures   in parentheses denote distance in miles below Cairo, Ill., gage.
                      MISSISSIPPI RIVER COMMISSION                                1709
   The total cost in the second New Orleans district, for channel and
corrective dredging in the Mississippi River during the fiscal year,
was $2,154,210.54, which includes cost of general operations in con-
nection with cut-offs. The total cubic yards removed under this head-
ing was 30,117,305 cubic yards, at a unit cost of 7.15 cents per cubic
yard. The cost and yardage figures do not include work in connec-
tion with contraction works (sand dikes).
   Dredging, Atchafalaya Basin: Dredging operations were carried on
in the Atchafalaya Basin for the purpose of developing one continu-
ous main channel from Atchafalaya River (at Alabama Bayou)
through Grand Lake. The enlargement of constricted reaches on the
Atchafalaya River between Simmesport and Melville was also un-
dertaken. Eight pipe-line dredges, including one Government-owned
dredge, one leased dredge, and six contract dredges, removed a total
of 25,274,461 cubic yards of material, as follows:
   Simmesport to Melville, Atchafalaya River Channel improvement
 (5-33) : Work was begun September 18, 1936, and completed January
9, 1937. One leased dredge worked at four locations between Simmes-
port and Melville, removing 2,607,390 cubic yards of material.
   Whiskey Bay pilot channel (57)3: Length 3.3 miles. Channel was
opened April 13, 1936, to the project bottom elevation of minus 20 feet
mean Gulf level. One leased dredge and three contract dredges were
used during the 1937 fiscal year to widen the upper part of Whiskey
Bay channel over a length of 9,700 feet; 625,545 cubic yards were
dredged by the leased dredge, and 1,793,000 cubic yards by contract
dredges, making a total of 2,418,545 cubic yards. The project is 100
percent complete.
   Whiskey Bay pilot channel extension (60)': Length 71/2 miles, was
begun April 27, 1935, and completed January 6, 1937. Three contract
dredges were used during the fiscal year to complete this project,
dredging 2,550,262 cubic yards of material. This amount plus the
yardage figure of 4,700,000 (estimated in the 1936 fiscal year report)
gives the yardage contract total for this project of 7,250,262 cubic
yards.
   Blind Tensas cut (70.7)': One and one-half miles long; was com-
pleted March 30, 1935. One contract dredge was used during the fiscal
year to enlarge Blind Tensas cut, moving 766,245 cubic yards of ma-
terial. The project was 50 percent complete on June 30, 1937.
   Bayou Chene cut--Tarleton Bayou (77.2)': Length 2.8 miles. Was
opened to project depth April 16, 1935. The enlargement of this
channel was begun April 28, 1936, and was 60 percent complete on
June 30, 1937. During the fiscal year 1937 one Government-owned
dredge and one leased dredge removed 4,651,980 cubic yards of
material.
   Chicot Pass Channel (81.2)': Length, 62,500 feet. Was begun
December 5, 1935, and opened July 24, 1936. The enlargement of this
channel to project depth was completed on April 10, 1937. One Gov-
ernment-owned dredge, one leased dredge, and one contract dredge re-
moved 10,426,829 cubic yards of material during the 1937 fiscal year.
This amount, plus the yardage figure of 8,344,832 (estimated in the
1936 fiscal year report), gives the grand total for this project of
18,771,661 cubic yards.
  * Distance in miles below head of Atchafalaya River, through main channel, Atchafalaya
Basin.
1710         REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY, 1937


   Grand Lake Channel (93) : An extension of Chicot Pass into Grand
Lake, 2.3 miles long. The project was begun February 1, 1937, and
on June 30, 1937, was approximately 85 percent complete. One Gov-
ernment-owned dredge moved 1,853,210 cubic yards of material during
the 1937 fiscal year.
   The total yardage moved during the fiscal year 1937 in construction
of one main channel in the Atchafalaya Basin totaled 25,274,461 cubic
yards at a cost of $2,226,586.94. This represents a unit cost of .8.81
cents per cubic yard.
   Old River, La.-Dredging in the vicinity of the mouth of Old
River, La. (772 miles below Cairo), was done during the fiscal year
ending June 30, 1937, by the Vicksburg district as follows: Dredge
Todd, August 12 to 18, 1936, moved 50,298 cubic yards of material.
The cost ($7,458.11) was paid from maintenance and improvement
of existing river and harbor works, Red River below Fulton, Ark.,
and is included in the annual report of the Vicksburg district (river
and harbor work) for fiscal year 1937.
   Experimental dredging to determine the feasibility of training
channels by early dredging, prior to the low-water stage, and thus
prevent the difficulties encountered at that time was undertaken by
the Memphis district during the fiscal year 1931 and has proved
successful thus far. In the Vicksburg district there has been less
trouble with low-water navigation during the past 7 fiscal years than
in previous years, notwithstanding the low stages that prevailed dur-
ing the low-water seasons; in 1930 a system of frequent surveys of
river crossings and markings of channel line at the crossing by buoys
was inaugurated; this system is probably responsible in large meas-
ure for less navigation trouble than in years of higher low-water
stages; another favorable feature was the absence of sudden minor
rises or freshets during the low-water season; such rises cause fills in
the channel crossings, these being scoured out as the freshet subsides
or a new channel formed; in either case there is an interval of difficult
navigation.
   The cost and net expenditures for dredging during the 12-month
period ended June 30, 1937, were as follows:
                                                           Regular funds                National Recovery Ad-

                                                                                          ministration funds
                   District

                                                      Costs          Net expendi-         Costs       Net ex-
                                                                         tures                       penditures

Memphis .....................                     $1, 653, 098. 63   $1, 826, 834. 53   __-, __
Vicksburg------------------                        2, 668, 524. 89    2, 289, 840. 71   $2,903. 24 $3, 229. 33
Second New Orleans 1_                              5, 541, 211. 90    5, 878, 932. 92
      Total---------------      -     -----        9, 862, 835.42     9, 995, 608. 16     2,903.24      3, 229.33

1 The cost of contraction works, $1,049,414.42 is included in the cost of dredging.


  The net total expenditures for dredging to June 30, 1937, amounted
to $53,237,892.80, of which $39,738,326.41 was expended on the new
project and $13,499,566.39 on the old project. Of the iotal expended
  8Distance in miles below head of Atchafalaya River, through main channel, Atchafalaya
Basin.
                                 MISSISSIPPI RIVER COMMISSION                                                  1711
on the new project ($39,738,326.41), $33,202,509.40 was expended
from regular funds and $6,535,817.01 from National Industrial Re-
covery Administration funds.
                                                        CUT-- OFFS


   Evidence exists of numerous cut-offs antedating the exploration of
the Mississippi River below Cairo. Twenty cut-offs are known to
have occurred between 1700 and 1929, of which 19 ochurred between
1765 and 1929. It is probable that several unrecorded cut-offs oc-
curred during the period 1700-1765. However, the existence of com-
plete maps of the lower river makes it possible to determine accu-
rately the number of cut-offs which have occurred since 1765. The
majority of these cut-offs are also mentioned in contemporary records.
The following tabulation lists the 32 cut-offs of record; with the
exception of the cut-offs at Leland and Yucatan, the cut-offs listed
as occurring beginning with 1929 were made by dredging and ex-
cavation work for improvement of the channel of the Mississippi
River.
                         List     of   Cut-offs Mississippi River--below Cairo


                                                        Miles           Bank                                Reduction
                                                                                                             in river
                 Name of cut-off                        below         through      Year in which cut-off      length
                                                        Cairo        which cut           occurred
                                                                     was made                               caused by
                                                                                                              cut-off


                                                                                                                           Mites
Needham's __-.                  -...... .......                135     West--   .-_   1821-..................                    11
Centennial or Devil'ss Elbow              ........ -           204     East----. 1876--------------------                        15
Commerce ........                                              270   ... do...---. 1874---------------------                     10.
Bordeaux Chute --.                                             279    _do--- ....     1874 .... _.._.                 .-__        7
Montezuma- ......                                              314     West--.....    Between 1796 and 1817 -__                  11
Horse Shoe        ____                                         320     _do ----..     1848 ...........-           __..- .         9
Napoleon or Beulah Lake ------------------                     400   -- _do---..      1863---------------------                  10
Caulk -----       - - -                    - .......           406    ___do--....     1937---------------------                  15
Ashbrook .......                             .........         444      East--..... 1935---------------------                    11
Tarpley       -----                              .....
                                                    --         461    _ do- ..--- .. 1935 _.___ ...........                       9
Leland .........      .                                        472     West--  ..... 1933--------------------.                   10
American ..........                              . ..  .       497   -_do .----- 1858---------------------                       11
Worthington .-       - -.                        --- .     --  506      East .--...1933---------------------                      4
Grand Lake __...                                 .. . . ..    -517       _--do ....--
                                                                                    . Between 1796 and 1817.                     10
Sarah__ - - - - - -                                            518    __do----... 1936--------------------                        5
Bunchs Bend-.....                                --. --        524   --_do ...--..    1830-------                                12
Willow ___ _--                                       ....|.564          West-- ..... 1934.  ...............                       8
Terrapin Neck_.. _                                             576     __do..--...1866-------------------                        16
Marshall ........         ............. . ....                 587    ___do--......
                                                                      --              1934.. .. .. .. .. ......                   4
Yazoo . ....                                                   596    __do ......     1799 ..........            __-...          12
Centennial Lake.... ........            ..........             601      -_do--......  1876...................                     6
Diamond .......                                                614      East .....    1933---------             ---....          12
Davis or Palmyra -- ---     -------------------                623        _--
                                                                           do- -_     1867-------------.......                   19
Yucatan....                                                    638    _--do--.        1929----------...........                  10
Rodney.........                                                664      West-.....    1936----....           .........            6
Waterproof_ .. .... ---.. .              .........             680     _ do-...... 1884----
                                                                      ..                  ---------------                        12
Giles . . . . . . .                                            690      East-.... 1933 ..       _-.__.......         ....        11
Glasscock...........                                           723    ._do ._.._.     1933-..__.........____                     11
Homochitto ........          -....-. .  .----                  753      West- ....    1776 .................                     13
Shreves_ ........... .-.....-..        ....... .               771      East-..... 1831-............-......                      15
Raccourci ........        ----.---......                       775    .. _do-.... 1848................. _                        19
Fausse River-...... .-......-.............                     814    .__do.... 1722----------------.....................        21



     Effectiveness of               cut-offs       and channel work.-Cut-offs and general
channel improvements inaugurated since 1929 have greatly increased
the carrying capacity of the Mississippi River throughout the entire
central portion. The general improvement in the channel capacity
may be definitely noted by a comparison of the 1929 high water, be-
fore the improvements were undertaken and the 1937 hiah water
           20196-37-pt. 1---10
1712       EEPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

with the project about half completed. A comparison of the 1929
and 1937 high waters at Arkansas City (438),2 for rising stages above
45 feet, shows an increase in channel capacity of 600,000 to 700,000
cubic feet per second for the same stage, and a decrease in stage of
about 11 to 12 feet for the same discharge. At Vicksburg (602) the
rising branch of the rating curve showed an increase in channel
capacity since 1929 of about 300,000 to 400,000 cubic feet per second
for the same stage, and a decrease in stage of about 5 to 7 feet for
the same discharge. A list of cut-offs made since 1929 is shown
in the preceding tabulation. These cut-offs have eliminated many
river crossings and have shortened the 330.6-mile river distance be-
tween the head of Caulk cut-off and the foot of Glasscock cut-off to
214.8 miles, a net shortening of 115.8 miles.
                              CONDITION OF CHANNEL

   Except when blocked by ice and during other rare and brief pe-
riods, there is generally in the Mississippi River below Cairo a good
continuous navigable channel with a depth of 9 feet or more and a
width of at least 300 feet for a distance of 741 6 miles and with a
depth of not less than 35 feet and a width of several hundred feet
at all times for the remaining 240 miles to Gulf of Mexico. This
navigable channel is also of ample width and of at least 14 feet depth
during 5 to 8 months of each year when high stages prevail on the
river.
   The following are depths and widths for the different stretches of
the river below Cairo that can usually be relied upon except during
the unusual lowest stages:
   Cairo to Memphis, Tenn., 227 miles, least depth 9 feet for width
of 300 feet. Low-water channel maintained by dredging.
   Memphis to mouth of Arkansas River, Ark., 172 miles, least depth
9 feet for width of 300 feet. Low-water channel maintained by
limited amount of dredging.
   Mouth of Arkansas River, to Vicksburg, Miss., 151 miles, least
depth 9 feet for width of 300 feet. Low-water channel maintained
by limited amount of dredging. The above mileage is based on navi-
gation of cut-offs at Ashbrook, Tarpley, Leland, Worthington, Sarah,
Willow, and Marshall (September 1937).
   Vicksburg to Angola, La., 120 miles, least depth 11 feet for width
of 300 feet or more. Low-water channel maintained by a limited
amount of dredging. The above mileage is based on navigation of
cut-offs at Diamond, Yucatan, Rodney, Giles, and Glasscock (Sep-
tember 1937).
   Angola to Baton Rouge, La., 71 miles, least depth 11 feet for width
of 300 feet or more. Low-water channel maintained by a limited
amount of dredging at rare intervals.
   Baton Rouge to New Orleans, La., 133 miles, least depth 35 feet
for width of 300 feet. Channel maintained by the first district, New
Orleans, La.
  " Figures in parentheses denote distance in miles below Cairo, Ill., gage.
  e Mileage based on navigation of cut-offs noted in stretches, mouth of Arkansas River to
Vicksburg and Vicksburg to Angola.
                  MISSISSIPPI RIVER COMMISSION                   1713
   New Orleans to Quarantine Station, La., 90 miles, least depth 62
feet for width of several hundred feet. Channel maintained by the
first district, New Orleans, La.
   On June 30, 1937, the governing depth to the Gulf of Mexico
through South Pass was 32 feet with a minimum width of 530 feet,
and a governing depth of 35 feet with a minimum width of 600 feet
through Southwest Pass, both referred to mean low water in the
Gulf of Mexico at the passes, as reported by the district engineer,
first district, New Orleans, La.
                          NAVIGATION   DATA

   To facilitate navigation of the Mississippi River from Cairo, Ill.
 (at the mouth of Ohio River), to the Gulf of Mexico, La., the Missis-
sippi River Commission has prepared a set of maps in 60 sheets cover-
ing the above reach of river showing location of navigation lights,
channel line, and other features pertaining to navigation; the maps
are available for sale to the public by the commission at 75 cents
for the set of 60 sheets. The commission has also prepared a mime-
ographed folder containing general information relative to naviga-
tion of the Mississippi River which is available for issue to the
public. Weekly channel reports are issued during the low-water
season by the Memphis, Vicksburg, and second New Orleans districts
giving the markings of the low-water channel and the depths at
crossings.
                  BANK PROTECTION AND REGULATION

   Since the adoption of dredging in 1896 the permanent work of
channel improvement has been confined chiefly to the revetment of
banks. The extent of caving bank requiring revetment was, how-
ever, relatively so great when compared to the funds available that it
has been necessary to confine the work to cases of urgent necessity,
such as threatened cut-offs, endangered levees of such large size as
could only be replaced at excessive cost, and the harbor fronts of
cities.
   The construction of works for bank protection on such an extensive
scale and in locations so difficult as those found on the lower Missis-
sippi was at the beginning a problem beyond the experience of engi-
neers. The first experiments included woven-willow mattresses of
different thicknesses, varying from 2 to 12 inches, and of different
degrees of compactness, elasticity, and roughness of surface. The
method of operation comprised three parts: First, the subaqueous
revetment; second, the grading of the bank above the water surface;
third, the upper-bank protection. The unsatisfactory woven-willow
mats, with upper-bank protection of brush and stone were followed
by stronger and more durable fascine mats about 16 inches thick,
bound so tightly with wire cables as to be nearly impervious to the
wash of the current through them, the upper bank being paved
with hand-laid rock or concrete in blocks or in situ.
   On account of the increasing amount of bank revetment for pro-
tection against caving and decreasing supply of economically avail-
able willows for the construction of mats, it became necessary to
1714    REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY, 1937


develop some form of mattress that would not require the use of
willows.
    Memphis district.-Experiments with concrete as a substitute for
the subaqueous willow mats were made from 1914 to 1918. Begin-
ning in 1914, experiments were made in the first and second districts
 (Memphis engineer district) with large sheets of concrete, 125 by 50
feet by 4 inches in thickness, reinforced with wire mesh and 3/-inch
cables. Later experiments were made in the same districts with con-
crete mats consisting of slabs 240 feet long by 12 feet wide by 33/4
inches thick, reinforced both transversely and longitudinally with
1/2- by 2-inch steel bars and wire-mesh fastenings.
    During the year ending May 31, 1924, 1,100 linear feet of bank
were protected by subaqueous mats of this type. Owing to the exces-
sive cost and difficulty of placing this type of mat, its further use was
abandoned.
    A type of revetment known as the "lapped-slab concrete revetment"
was developed during 1925 to 1927. Mats were formed of reinforced
concrete slabs 4 inches thick, 6 feet wide, and 11 feet long, overlap-
ping and interconnected.
    The results of the experimental work during the year ending May
31, 1927, were so encouraging that the district was authorized to
construct a power-operated casting plant and sinking plant with
necessary auxiliary plant embodying the improvements suggested by
the experimental work. This mat was used as the standard concrete
mattress during the years 1928 to 1931. In March 1931 the design of
the mattress was altered, eliminating the lap between individual
slabs, the slabs being changed to 10 feet by 6 feet by 4 inches. In
October 1931 the thickness of the slabs was reduced from 4 inches to
3 inches for further economy.
    The Vicksburg district's articulated concrete mattress unit was
transferred to this district in June and July 1931 and worked the full
season, and approximately 1 month in the 1932 season, when it was
retransferred to Vicksburg district.
    Subaqueous investigation in the Memphis district during the low-
water season of 1931 disclosed faults from various causes in existing
bank-protection works. Based on the early findings of the subaque-
ous investigation, there was initiated in the Memphis engineer dis-
trict in September 1931 an intensive study of all metals which might
be used for reinforcing and fastenings, as well as to determine which
of these metals might be practicable for use, both from the stand-
point of prolonged life through corrosion-resistant properties and a
reasonable increase in cost. This step was taken since the subaqueous
investigation showed that a large percentage of the failures noted in
the bank-protection work was caused by failure from corrosion of the
metal fastenings previously used. The result of these experiments
and investigations indicate the desirability of abandoning the slab
type of concrete mattress and the improvement of articulated tynpe
mattress by increasing the width of the individual blocks and by
using noncorrosive reinforcing and fastenings of some material hav-
ing corrosion-resisting pronerties equal to commercially pure copper.
Preparations were initiated in 1932 for an accelerated corrosion test.
using concentrated waters of the Mississippi River in order to de-
termine what noncorrosive materials are suitable for use as rein-
                   MISSISSIPPI RIVER COMMISSION                   1715
forcing and fastenings. This test was carried on through July 1933,
when stopped for lack of funds, and due to failure of test to develop
results. Corrosion-resistant wire and strand are used in the construc-
tion of fascine willow mattress; this type of mattress, however, does
not offer possibilities of much reduction of cost nor increase in length
of life, which appear probable with the improved type of articulated
concrete mattress.
   This district retained one of the two sinking plants transferred
from Vicksburg, and with minor alterations to the slab-casting plant
and construction of a mooring barge is equipped to lay standard
articulated concrete mattress. The articulated concrete mattress was
:standardized in 1932, and noncorrosive fabric wire and fastenings
are being used in all work since then. Work was continued on the
types of noncorrosive materials for construction by initiating a test,
using a paddle wheel constructed on one end of a barge and placed
in the Mississippi River, with all different types of noncorrosive
metals attached to the paddle wheel, which is free to rotate, to deter-
mine what noncorrosive materials are suitable for use as reinforcing
and fastenings; also, work was continued on the design of the articu-
lated mattress to determine a more effective and more economical
type for this district.
   During the fiscal year 1934 experiments in connection with tetra-
hedral block type of bank protection were conducted in the Memphis
district; a description of the tetrahedrons is given under Vicksburg
district.
   During the 13 months ending June 30, 1929, 35,332 linear feet of
new revetment was placed of which 12,961 linear feet was lapped-
slab concrete revetment; during the 12 months ending June 30, 1930,
40,801 linear feet of new revetment was placed, of this amount 20,398
linear feet was lapped-slab concrete revetment; during the 12 months
ending June 30, 1931, 44,380 linear feet of new revetment was placed,
of this amount 31,849 linear feet was lapped-slab concrete revetment;
during the 12 months ending June 30, 1932, 84,490 linear feet of new
revetment was placed, of this amount 56,259 linear feet was concrete
mats, 18,401 linear feet willow and concrete mats; during the 12
months ending June 30, 1933, 26,619 linear feet of new revetment was
placed, of this amount 22,068 linear feet was concrete mats and 4,551
linear feet was willow fascine mats; during the 12 months ending
June 30, 1934, 16,520 linear feet of new revetment was placed, of
this amount 15,625 linear feet was concrete mats, 680 linear feet was
lumber mattress, and 215 linear feet was tetrahedral concrete-block
type; during the 12 months ending June 30, 1935, 6,097 linear feet
of new revetment was placed, of this amount 5,897 linear feet was
concrete mats, and 200 linear feet was tetrahedral concrete block
type; during the 12 months ending June 30, 1936, 18,555 linear feet
of new revetment was placed, of this amount 10,355 linear feet was
concrete mats, and 8,200 linear feet was lumber mattress and stone
paving.
   Work during the fiscal year ending June 30, 1937, consisted in
placing 3,494 linear feet of new revetment and about 1,673,910 square
feet of concrete mattress and 1,153,628 square feet of stone paving as
repairs to and renewals of old revetment work. The season's work
also included revetment surveys.
1716    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   During the fiscal year 1937 there was no new construction work
under the contraction works program, and repairs to existing work
consisted of minor maintenance only.
   Vicksburg district.-Experiments were begun in the third district
(Vicksburg engineer district) in 1915 with concrete mats. These
mats as now built are formed of reinforced concrete slabs 3 inches
thick, 111/2 inches wide, and 3 feet 11 inches long, reinforced and
connected by bracket-type noncorrosive No. 5 wire fabric so designed
that completed mattress will have a unit tensile strength of 4,000
pounds per foot in every direction. The units formed with the above
fabric, each 4 by 25 feet (100 square feet), are clipped together with
noncorrosive wire clips. Various changes have been made in the
interest of durability and economy, and experiments looking to
further efficiency are being continued. The amount of reinforced
concrete mats placed in the Vicksburg district during the 13 months
ending June 30, 1929, was 26,435 linear feet; during the 12 months
ending June 30, 1930, 14,030 linear feet; during the 12 months end-
ing June 30, 1931, 15,198 linear feet. There was no reinforced con-
crete mat placed during the 12 months ending June 30, 1932. During
the 12 months ending June 30, 1933, 14,215 linear feet of new revet-
ment were placed. During the 12 months ending June 30, 1934,
5,705 linear feet of new concrete mattress revetment and 3,000 linear
feet of experimental concrete tetrahedral block revetment were placed.
During the 12 months ending June 30, 1935, 9,385 linear feet of new
concrete mattress and 320 linear feet of experimental concrete tetra-
hedral block revetmenrt were placed. During the 12 months ending
June 30, 1936, 4,763 linear feet of new concrete mattress were placed.
   During the fiscal year 1934 experiments were begun with a new
type of revetment. The river bank was covered with a blanket of
concrete blocks shaped as tetrahedrons, the separate blocks having an
altitude of about 1 foot. The blocks were made by contract and
placed by Government-owned plant and hired labor as protection to
approximately 2,297,900 square feet of river bank (includes both
new work and repairs). Above the water surface the blocks were
hand-placed to form a close-fitting pavement, using 250 blocks per
100 square feet of area. Below the water surface the blocks were
thrown from barges and distributed over the area to form a blanket
of approximately 250 blocks per 100 square feet of area. The effec-
tiveness of this type of bank protection is not yet fully determined
because of the short length of time it has been in use.
   Work during the fiscal year ending June 30, 1937, consisted of
placing 209,000 square feet of concrete mattress and 94,100 square
feet of rip-rap as repairs to and renewals of old work. Sand dikes
constructed by dredging, built during the fiscal year 1937 under the
contraction works program, totaled 2,600 linear feet. The season's
work also included revetment surveys and repairs to plant.
   There has been placed to date in this district a total of 223,494
linear feet of concrete mattress and 3,320 linear feet of concrete tetra-
hedral block revetment for bank protection and 480 linear feet of
permeable pile dike and 53,740 linear feet of sand dike in connection
with the contraction works.
   Second district, New Orleans.-The concrete revetment unit in use
by the second district, New Orleans, was completed and placed in the
field during fiscal year 1929.
                   MISSISSIPPI RIVER COMMISSION                     1717
   During the 13 months ended June 30, 1929, a total of 15,843 linear
feet of new revetment (willow mats) was placed in the second New
Orleans district; during the 12 months ended June 30, 1930, 7,857
linear feet of new concrete revetment was placed and 11,610 linear
feet of new willow mats, total 19,467 linear feet; during 12 months
ended June 30, 1931, 1,741 linear feet of new concrete revetment and
1,782 linear feet of new willow mats, total 3,523 linear feet; 155 linear
feet of new concrete revetment was placed during fiscal year 1932,
and 190 linear feet during fiscal year 1933, and 3,271 linear feet
during fiscal year 1934; 530 linear feet of new concrete revetment
and 5,394 linear feet of asphalt revetment were placed during the
fiscal year 1935, a total of 5,924 linear feet. During the fiscal year
ending June 30, 1936, 15,966 linear feet of new asphalt revetment
were placed.
   During the fiscal year ending June 30, 1937, 6,412 linear feet of
new asphalt revetment were placed and 3,505,937 square feet of
asphalt revetment were constructed for repairs to and renewals of
old work. Sand dikes constructed by dredging built during the
fiscal year 1937 under the contraction works program, totaled 35,550
linear feet.
   Extensive experiments based on the use of asphaltic mixtures
were carried out during the fiscal year 1933 in the second district,
New Orleans, in an effort to develop a mattress free from openings
with all metal parts embedded in a protective medium. Surveys
along the river between Baton Rouge and the northern limits of the
district developed the fact that bar sand of uniform composition, as
well as a deposit known to geologists as "loess", which has proven
of value as a filler in asphaltic mixtures, were available in ample
quantities. Exhaustive laboratory tests and studies were undertaken
with these materials to determine the best asphalt mixture suitable
for use in a reinforced asphaltic mattress, and a satisfactory mixture
formula was developed. The reinforced asphaltic mattress is com-
posed of this special asphaltic mixture cast in a series of successive
launches, welded together to form a continuous unbroken mattress,
in which all cables, reinforcing, and fastenings are completely em-
bedded and thoroughly protected. Actual working scale trials of
the reinforced asphalt mattress were made in the second district, New
Orleans, during January and February 1933. An experimental
plant was developed to manufacture and sink asphalt mattresses.
About 12,000 square feet of asphalt mattresses were made and sunk
in the Mississippi River at the engineer depot, New Orleans. Water
of maximum depth of 85 feet, with a current of 5.6 feet per second,
was encountered during launching. The mattress was successfully
made and launched under all sorts of weather conditions. Consider-
able drift was encountered due to rising river, so that it may be said
that general conditions obtaining were quite severe. The results of
the trials were favorable. At the end of the fiscal year 1933 a full-
size asphalt revetment plant was under construction. The plant
was placed in operation during the fiscal year 1934.
   Plans and specifications for contraction-work plant for the Mem-
phis district were completed in 1930 and construction thereof com-
pleted during fiscal year 1931. Plant is available in the Vicksburg
district for contraction work. In the second New Orleans district
1718           REPORT OF CHIEF OF ENGINEERS, U. S. ARML,                                                        1937

all the various types of dredges are used as contraction plant; during
the fiscal year 1937, two pump barges and three cutter head dredges
were used on contraction work in the second New Orleans district.
studies and surveys in connection with contraction works on lower
river were continued.
   Swummary.-Since work began in 1928 under the present flood-
control project provided for in congressional act dated May 15, 1928,
approximately 446,000 linear feet of new revetment for bank protec-
tion covering 84.5 miles of river bank has been constructed and placed
along the Mississippi River below Cairo (not including rock groins,
pile dikes, or crib dikes) ; under the contraction-works program more
than 199,000 linear feet of dikes (37.7 miles) have been constructed
in the Memphis district; and approximately 54,220 linear feet of
dikes (53,740 sand dikes and 480 permeable pile dikes) (10.3 miles)
have been constructed in the Vicksburg district and 108,540 linear
feet of sand dikes (20.6 miles) in the second New Orleans district
under the contraction-works program.
   Work during the 12 months ending June 30, 1937, within the
Memphis, Vicksburg, and second New Orleans districts consisted in
placing 9,906 linear feet of new revetment; in addition about 1,882,910
square feet of concrete mattress, 1,153,628 square feet of stone paving,
94,100 square feet of riprap, and 3,505,937 square feet of asphalt
revetment were constructed and placed for repairs to and renewals
of old revetment work. No new dikes were constructed and only
minor maintenance to existing works was carried on during the fiscal
year 1937 in connection with contraction works in the Memphis dis-
trict; in the Vicksburg district 2,600 linear feet of new sand dikes
were constructed in connection with contraction work and 35,550 lin-
ear feet in the second New Orleans district.
   The costs and net expenditures for revetments and contraction
works during the 12-month period ending June 30, 1937, were as
follows :

                                                                        Regular funds                     National Recovery
                                                                                                         Administration funds
               Allotment and district

                                                                    Costs           Net expendi-            Costs         Net ex-
                                                                                       tures                             penditures

Revetments:
    Memphis district---------... --------                    _$1,   533, 167. 71    $1, 530, 096. 42   ------------          $64. 73
    Vicksburg district.           _
                            _-------....-                  ..     - 221, 918. 45        318, 456. 64    .....    .....
    Second New Orleans district_--------------1, 305, 586. 87                        1, 443, 148. 63
      Total revetments-                 ..   .             .      3, 060, 673.03     3, 291, 674. 69   ------------           64. 73
Contraction works:1
    M mphis district ..........................                     213, 310. 07        217, 985. 35
    Vicksburg district--........ .......
                                      _    .......                  176, 442. 35        165, 956. 22
      Total contraction works.......------------....---.            389, 752. 42        383, 941. 57

      Grand total. ..................            .......          3, 450, 425. 45    3, 675, 616. 26                           64. 73


  1 Cost ($1,049,414.42) of contraction works for second New Orleans district is included in cost of dredging,
see table p. 1710.
  2 No new work; cost shown is for maintenance of existing works and surveys.
                                         MISSISSIPPI RIVER COMMISSION                                                                        1719

  There were no expenditures for revetments from contributed funds
during fiscal year 1937. The total net expenditures on revetment and
contraction works from 1881 to June 30, 1937, amounted to $149,-
753,069.95 (old project, $76,498,040.20; new project, $73,255,029.75).
This total includes $3,201,987.63 contributed for local interests (old
project, $3,137,219.97; new project, $64,767.66), but does not include
$353,171.60 expended by the city of New Orleans. Of the total
expended for revetments and contraction works under the new project
($73,255,029.75), $57,741,704.60 was expended from regular funds and
$15,513,325.15 from National Recovery Administration funds.
Effective          length of bank protection June 30, 1937, and length built during 12
                                         months, July 1, 1936, to June 30, 1937


                                                                                      Below          Bank of          Built dur-       Effective
                                   Locality                                           Cairo           river            ing yearg year revetment
                                                                                                                                       in place


                   MEMPHIS ENGINEER DISTRICT
                                                                                      Miles                          Linear feet      Linearfeet
Below Cache River, Ill. (on Ohio River)                                 --                        14      Right..              0              2  8, 600
Cairo, Ill. (on Ohio River)__-------------                                                        1                do.....     0                 5, 005
Beckwith Bend, Mo------------------------                                                          33          .. do....       0               24, 720
Hickman, Ky....--------------------------------------                                             36      Left             .   0...
                                                                                                                               O                 6, 449
Reelfoot Front, Ky ---------------------------------                                              40      -.. do...            0               14, 137
Bend Island No. 8, Mo_                                                                            45      Right ...-           0            3 7, 042
Chute Island No. 8, Ky-                                                                           47 Left ----                 0               58, 200
Slough Landing Neck, Tenn-- -.---------------                                 ------          61-63            .do .-          0               22, 524
New Madrid, Mo----------------------------                                     -------            71      Right----            0                 5,559
New Madrid Bend, Mo-...                      ..---------------.---------                      71-75 - -            do...       0             a 19, 218
    Do.....-----------------------------------------                                          71-75       _ do..-----          0               71, 500
M erriwether Bend, Tenn------------------------------                                             88 Left.-----                0                 7,313
    Do-....------------------------------------------                                             88 -. do -..-                0               8 1,700
Hathaway Landing, Tenn ----------------------------                                              105         - do- ..          0                 4, 076
Gayoso Bend, Mo.....
Caruthersville, Mo-_      .........-
                                        ------------------
                                              -
Bells Point, Mo-----------------------------------
                                                      ------                   -                 112 .
                                                                                                 114
                                                                                                        -do.....
                                                                                           109-110 Right....

                                                                                                             - do....
                                                                                                                               0
                                                                                                                               0
                                                                                                                               0
                                                                                                                                           2 '12,405
                                                                                                                                                 4, 140
                                                                                                                                                 5, 500
Linwood Bend, Tenn                    - ..----------------------------                     118-119        Left......           0             3 16, 900
Baders Front, Mo........                                                                         121 Right--..-                0                 8,200
Island No. 18, Mo_ _.....                                                                  122-123 -               do....      0                 4,795
Huffman-Hickman, Ark ------------------------------                                        130-132           . do ...          0               14,944
Barfield, Ark ____---------------                                                          142-144 -. do....                   0          23 8 14, 677
Plum Point Reach:
    Daniels Point, Ark                     .------------------                                   152 -..           do _        0            (3)
    Ashport, Tenn----------                           --- -------------                    155-159 Left -                      0            (3)
    Kate Aubrey, Tenn-                                                                           158 Right....
                                                                                 .-----------------------------                0                  2, 500
    Keyes Point, Tenn---------------------------                                           1.59-161 Left-------                0              2 10, 634
    Fletchers Bend, Ark...----------------------------- 160-163 Right ..--                                                     0             (3)
    Elmot Bar, Tenn -                                   ------                             162-163         --- do----          0             (3)
    Osceola, Ark _---------------------------------                                              165           ----do-----     0                  5, 823
        Do           ---------------------------------------                                     165 -_ do _..                 0                71, 350
    Bullerton Bar, Ark ------------------------------ 166-169                                             ---                  00do....         6 9, 050
Island 34, Tenn _____        -----------------------------                                       178 ---. do....               0                2 5, 295
Golden Lake, Ark-........---------------------------                                             191               do.---      0             (3)
Chute of Island 35, Tenn-.....                       .-.                   .-                    192-       .. do.....         0                  2, 700
Bend of Island 35, Ark ------                                                                    192      ... do.....          0             (3)
Happy Valley, Ark _--------------------------------                                        206-207         .. do.....          0            68o 6, 100
Robinson Crusoe Island, Ark -------------------------                                            225 ... do..-----             0            (11)
Hopefield Bend, Ark-------------------------------                                               227 ----- do----              0             (3)
Memphis, Tenn_ _ --------------------------------                                          227-228 Left.....                   0                85, 483
Tennessee Chute, Tenn-
Bauxippi-Wyanoke, Ark --------------------------
                                                                                 .-----------------------------
                                                                                                 231 -..
                                                                                           233-235       Right---
                                                                                                                   do----      0
                                                                                                                               0
                                                                                                                                             12   1, 000
                                                                                                                                                 23, 650
Cow Island Bend, Ark ._                                .---------------------------        248-249 ..... do....                0              2 11, 500
    Do     ------------------------------------------
            -,,                                                                                 250 .--- do----                0            (11)
Norfolk, Miss :-::::::---------                  -------------                             252-253       Left . .--            0              2 12, 992
Star Landing, M iss __--------------------------------                                     255-257          ... do ---         0                2 6, 900
Porter Lake, Ark ._                                                              ..-------------------------------
                                                                                           258-260       Right....             0              3 45, 300
Polks Landing, Miss                --                                              _       263-264       Left ---              0              3 43, 600
Mhoon Bend, Miss...---------------------------------                                             273 -          Ado .          0               ,3 6, 988
Walnut Bend, Ark . ...                                                                           278 Right...                  0           3 4 62, 500
    See footnotes at end of table.
1720                REPORT OF CHIEF OF ENGINEERS, U. S. ARMIY, 1937

Effective length of bank protection June 30, 1937, and length built during 12
               months, July 1, 1936, to June 30, 1937-Continued

                                                                                                          Bank
                                                                                                           riverof
                                                                                          Below                             Built dur-       Effective
                                                 LocalityCairo                                                               ing year       revetment



       MEMPHIS ENGINEER DISTRICT-continued
                                                                   Miles                                                    Linear feet     Linear feet
Trotters Landing, Miss.._________________              ______ ._       304                               Left ___
                                                                                                                ...                    0        312,000
    Do ... -         -------------------                               305                              ._-do ----.                    0         0 6, 500
Helen, Ark .--------------------------------------                     307                               Right .-                      0           6,000
Delta, Miss_____-__           -       --
                              ___________-_________...             315-316                               Left ...                      0           5,800
Friar Point, Miss----...__....___________ .__ .___                     318                              ___do__                        0           4, 235
Old Town Bend, Ark__________________                   _____  __       325                               Right-     -..                0          10, 000
Fair Landing, Ark ..   ---------------------------------               336                             -.- do ......                   0          10, 400
Avenue, Ark_-__--
             ......              -_______ ._________             _     346                              ___do ------           14 3, 494         16, 187
Sunflower, Miss_.....__________.___            __-__    ____-      354-357                               Left -.-                      0          10, 000
Knowlton, Ark              -___--.........__.______.________-. .       366                               Right.__                      0            7, 600
Laconia, Ark.....................---..----... --                       376                                .__do..                      0            1,280

                  VICKSBURG          ENGINEER DISTRICT

Riverton, Miss....------------------------------------                                                  396 Left------.               0            3 4, 930
Pendleton, Ark. (Arkansas River)--------- ----------                                                   1 50      Right-....           0              3,929
                  .- -..
    Do - - - .- --.   _
                      ._     . -.  .            .              ...-.                 . .--           - 15 0 ._ d o .. .               0                 46 0
Red Fork, Ark. (Arkansas River).__________                                                              1 30 -__do .. _..             0            3 2,315
Caulk Neck, Ark ----------------------------------
                                    _                                                                   407 ___do-----.               0              4, 720
Lake Bolivar Front, Miss ..-             _____-__-___                      ________--                   415 Left......                0           3 14, 650
Cypress Bend, Ark-...--------------------------------                                                   427      Right ....           0              7, 890
Arkansas City and Yellow Bend, Ark------------------                                                    438 ___do-..                  0             17, 635
Ashbrook Neck, Miss__-----------
                               ....................                                                     445 Left__ ...                0       (3) (18)
Panther Forest, Ark...         --------------------------------                                         450      Right....            0         (3)
Millers Bend, Miss_.....                           ....................-------------------------------460 Left------                  0             10,153
Tarpley Neck, Miss..................-----------------------------                                       462 ___do-.---.               0       (3)(16)
Leland Neck, Ark........                     ... ............--------------------------
                                                                                      -------           470      Right.--.            0       (3) (18)
  Do-.-------------------------------------------                                                       470 --- do          .----     0         (17)
Leland Neck Cut-off, Ark------------_____                                    --
                                                                            ________                    473 Left ......               0          18 1,865
Greenville, Miss....-----------------------------------                                                 480 --_do .-----              0         (3)
LaGrange Towhead, Miss ..---------------------------                                                    484 ___do-..._.               0            3, 500
Warfield Point, Miss_______________-.....______                                           .             485 .__do ._...               0            2, 660
Vaucluse, Ark ......        _____                  ___...___             ___......_____                 489 Right ....                0          3 1,530
Sunnyside, Ark ...                      ...........                                                     491 .__do
                                                                                ....----------------------------------- ---           0           10, 590
Lower American Cut-off, Miss-___- -- _____                                                -____--496             Left ......          0           10, 680
Longwood, Miss........                         .....--------------------------                          501 ___do --                  0         (3)
Grand Lake, Ark ....... ........----------------------------------                                      508 Right ---.                0           19, 540
Princeton, Miss----------------------...-                                     _515    --..
                                                                                    -..                          Left.----            0            6,550
Lake Providence Reach:
    Louisiana Bend, La..___________________                                           ____              522 Right ---                  0        (3)
    Lake Providence, La- ---------------------------                                                     540 -__do. .                  0        (3)
Valewood, Miss.--_________..._________.__-                                                               528 Left.--.                  0           13, 820
Hagaman, La...-------------------------------------                                                      544 Right ....                0            13, 970
Fitler Bend, M iss-.............______ ..........                                                        551 Left ......               0            10, 100
Cottonwood, Miss....---------------------------------                                                    557        do------           0             9,915
Goodrich, La----                        __............-  _..................   ____                      561 Right-....                0             4, 895
Albermarle Bend, Miss-                        --......      .................  -----                     570 Left ......               0        (3)
Milliken Bend, La .______............___......__                            ..         _____             584      Right ...            0             6, 440
Duckport, La............................-------------------------------------..                          594      .__do------.         0             6,320
False Point, La........                      .....             ..-----------------------------------.....597 _.do ...----              0             1,965
-Delta  Point, La------------------------........-----------                                             600 ___do.......              0             3, 450
Opposite Delta Point, Miss---............                     __              .. ---- .                  600 Left .....                0        (3)
Vicksburg Harbor, Miss....-----------------------------                                                  601 ___do                     0             7, 335
Barge Line Terminal, Miss..........-.........                                                           601 __do-                      0             2, 210
Reid-Bedford Bend, La--......--...................-------------------------                              608 Right..__                 0_       (3)

                  SECOND DISTRICT, NEW ORLEANS

Yucatan Bend, Miss------------------............................-------                  639-640 Left-_.....            0                        (3)
Hard Times Bend, La.................................                  ----                   645    Right ...           0                        (3)
Hardscrabble Bend, La-....------------- ----------                                       655-656 _._do ..               0                           14, 773
Bondurant Chute, La---                           __................................          657 ...__do._    .         0                            5, 780
Cottage Bend, La ---------------------.....---.---------                                     664 _.-do-------           0                            5,028
Kempe Bend, La__....................................                                     671-675 -__do...----           0                        1  24,055
                         -----------------------------
Giles Bend, Miss----------                                                               688-692 Left_ ....             0                        (3)
Marengo Bend, La--------__----__                       __.....--------
                                                         ---                           - 697-700    Right....           0                        ()
Natchez Front, Miss---------------................                 .             -..     704-706    Left ....           0                            6, 045
Deer Park Bend, La....___---------------------------                                     728-729    Right.----          0                        (3)
Grand  Bay, La.....--...--             ..............------------------------------.         816   _
                                                                                                  --  do                0                            8, 370
Plaquemine, La..........-------   ----........--------------------                           863     .__do      ------
                                                                                                                 0 2, 297                            8, 932
White Castle, La...                        ........----------------------------------.       878 _do.......
                                                                                                    -           202, 897                             5, 640
                                    MISSISSIPPI RIVER COMMISSION                                                  1721
Effective length of bank protectibn June 30, 1937, and length built during 12
               months, July 1, 1936, to June 30, 1937--Continued


                              Locality                          Below
                                                                Cairo      Bank
                                                                            river of          Built dur-
                                                                                               ing year       Effective
                                                                                                             revetment
                                                                Cairo       river              iin               place


      SECOND DISTRICT, NEW ORLEANS-continued
                                                           Miles                              Linear feet    Linear feet
Kenner Bend, La ..____________-______________           -__ -957                 _
                                                                         Left.....                 1, 218
                                                                                                  o20                8, 128
                      . . . .___-...
Avondale Bend. La_________     . . .. .       .__ -         -__ 962      Right.._____                   0          10, 253
New Orleans Harbor, La_---------__-......._____     --.    965-979       Right and                      0          69, 552
                                                                           left.
         Total revetments--------------------------------....
                                                 ....--------                         ---- 21 229,906         2324 761, 829

    1 Miles above mouth.
  2 Length     corrected.
    3 Inactive revetment due to channel change, 5,400 linear feet, Daniels Point; 14,140 linear feet, Ashport;
16,290 linear feet, Fletchers Bend; 5,040 linear feet, Elmot Bar; 4,735 linear feet, Golden Lake; 4,987 linear
feet Bend of Island, 35; 16,724 linear feet, Hopefield Bend; 9,317 linear feet, Memphis; 3,800 linear feet,
Bend of Island 8; 422 linear feet, Gayoso Bend; 3,480 linear feet, Barfield; 8,260 linear feet, Porter Lake;
8,494 linear feet, Polks Landing; 3,160 linear feet, Walnut Bend; 10,713 linear feet, Trotters; 870 linear feet,
Linwood Bend; 5,250 linear feet, Riverton; 3,685 linear feet, Red Fork; 3,100 linear feet, Lake Bolivar Front;
15,000 linear feet, Ashbrook Neck; 7,400 linear feet, Panther Forest; 805 linear feet, Tarpley Neck; 12,800
linear feet, Leland Neck; 29,285 linear feet, Greenville; 2,500 linear feet, Vaucluse; 4,150 linear feet, Long-
wood; 11,175 linear feet, Louisiana Bend; 12,680 linear feet, Lake Providence; 3,100 linear feet, Fitler Bend;
13,170   linear feet, Albermarle Bend; 1,930 linear feet, Opposite Delta Point; 12,795 linear feet, Reid-Bedford
Bend; 8,547 linear feet, Yucatan Bend; 11,675 linear feet, Hard Times Bend; 15,190 linear feet, Giles Bend;
19,394 linear feet, Marengo Bend; 12,737 linear feet, Deer Park Bend; 4,910 linear feet, Kempe Bend.
   4 Amount shown as inactive in footnote 3, above, was inadvertently reported as length corrected in 1936
Annual Report.
   5Lumber mattress and stone paving.
   6 Lost due to flanking; 300 linear feet, New Madrid Bend; 204 linear feet, Barfield (1936); 7,050 linear feet
Bullerton Bar; 1,900 linear feet, Happy Valley; 1,000 linear feet, Walnut Bend.
   7 Linear feet of rock groins for bank protection.
     Linear feet of permeable pile dikes for bank protection.
   9 Linear feet of permeable crib dikes for bank protection.
   to Includes 200 linear feet tetrahedral blocks.
   11Inactive permeable crib dikes due to channel change: 744 linear feet Robinson Crusoe Island, and
2,876 linear feet Cow Island Bend.
   12Built and paid for by Union Sand & Gravel Co.
   13Length of revetment is as shown based on recent surveys; inadvertently reported as 5,000 linear feet in
1936 Annual Report.
   14Concrete mats.
   15Spur levee dike-revetted end.
   16Destroyed due to development of cut-offs; 4,250 linear feet, Ashbrook Neck; 760 linear feet, Tarpley
Neck; 4,500 linear feet, Leland Neck.
   17Permeable pile dike; 2,855 linear feet destroyed by cut-off and 1,670 linear feet abandoned and razed.
   18 1,155 linear feet destroyed by high water (1934).
   19850 linear feet lost due to cut-off.
   20Asphalt mattress.
   21Includes 3,494 linear feet concrete mats and 6,412 linear feet asphalt mattress.
  221.9 miles.
   23Does not include 2,850 linear feet of pile and rock groin, 1,700 linear feet of permeable p ile dikes, 14,700
linear feet of permeable crib dikes, nor 460 linear feet of spur levee dike.
   24144.3 miles.
Effective length of contraction works, June 30, 1937, and length built during 12
                      months, July 1, 1936, to June 30, 1937

                                                                Below      Bank of            Built dur-      Effective
                              Locality                          Cairo       river             ing year      dikes in place

                  MEMPHIS ENGINEER DISTRICT
                                                            Miles                             Linear feet    Linearfeet
Dorena Landing, Mo--------------.......-------------          37-40       Right_....                   0           1 5,000
Island 8, Ky..-------------------------------------           42-48       Left ......                  0         1 2 9, 815
Chute of Island 8, Ky------------------------------           43-45     .__do..--                      0           1 2, 654
Kentucky Point, Ky.......------..                  -70-71               ... do......                   0           18, 216
Toney Towhead, Tenn......    ---------------------------      76-78     -.. do......                   0           16, 000
                      .
Point Pleasant, Tenn_----         -........ -------------     79-81     ._do. .....                    0         12 4, 595
Ruddles Point, Mo------------------------------               85-87       Right ....                   0           1 4, 229
Head of Island 13, Tenn----................................   91-92       Left.......------             0          14, 412
Island 15, Gayoso, Tenn......................._----.....    105-107     ...__do......                  0           1 4, 428
Opposite Caruthersville, Mo....---------------------- 110-113             .__do_. #._                  0           19, 574
    See footnotes at end of table.
1722              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Effective length of contraction works, June 30, 1937, and length built during 12
               months, July 1, 1936, to June 30, 1937-Continued

                                                                                     Below            Bank of     Built dur-          Effective
                                   Locality                                          Cairo             river       ing year         dikes in place


        MEMPHIS ENGINEER DISTRICT-continued
                                                                                      Miles                       Linearfeet         Linear feet
Below Caruthersville, Mo___...__                __.... ____               ___        113-114       Right                   0              1 2, 374
Bells Point, Mo-....                         -       __115-117                                    ___do                    0                  2
                                                                                                                                         1 3, 894
Booths Point, Tenn..                                                                 119-121
                                                             .....-----------------------------    Left _--_               0              1 1,684
Cottonwood Point, Mo- _____________-             .              - _- ___-            124-125       Right ...                   0          11,407
Head of Island 21, Tenn_ ___----____                      ----                -__ _ 127-130        Left ....                   0         1 13, 541
Ashport-Golddust, Ark_ -____                  _________ _____                        154-158       Right                       0         1 10, 436
Ashport-Golddust, Tenn__ ... ___                ________--                      __   158-160       Left .....                  0          1 1, 600
Keyes Point, Tenn_______.... __________                        ___           ____    162-164      ___do                        0          1 6, 847
Below Luxora, Ark_              -         -      -______-__.___            __--      163-164       Right                       0          1 5, 600
Island 34, Ark _.---------------------------------.                                  179-182      ___do                        0         1 12, 370
Morgan Point, Ark_ ._...................                                 .        .  185-187      ___do                        0          1 6, 025
Island 35, Tenn ..--------------------------------.                                  193-194      ___do                        0          1 1,417
Chute of Island 35, Tenn ___--------_______--                      ---------         194-197       Left                        0         1 6, 525
Below Island 35, Ark__-......_____               _                _---------         196-198       Right                       0             3, 950
     Do     ---------------------------------------                                  196-199      ___do                        0          16, 594
Redman Point, Ark__              _________                __            __           218-220      -  do                        0          1 5, 696
Redman Point, Tenn_ ---------------------                            ______-- 219-221              Left                        0          1 3, 424
Vice Presidents Island, Tenn_ ....... __.__.--------                       -      .  229-230      -__do                        0          1 3, 685
Wyanoke, Ark _____________-- -     ....        ___........._                         236-237       Right                       0          1 2, 065
Cat Island, Ark- _..--------------------------------                                 250-253      ___do                        0         1 12, 329
Prairie Point, Ark_ ___________-_________---_                                        300-303      ___do                        0         1 10, 560
Island 63, Miss---___-__   ___-___ ...-. __---                                       328-331       Left                        0           1 4, 999

                  VICKSBURG ENGINEER DISTRICT
Walker Bend, Ark,_ --------------                            ----                          489     Right                      0                     40
Opossum Chute, La             --------------------------------                             530    ___do   -..           5 2, 200            5 2, 200
Youngs Point, La_-------------------------------------                                     596    _..do ---                   0                  40
False Point, La -________________ _________.. _____-       .                               597    ___do -___                  0              16 480
Racetrack Towhead, La______ __________________
Racetrack Towhead, Miss _____-                       -  --
                                                  ________ ___---
                                                                                           606
                                                                                           607
                                                                                                  _do
                                                                                                   Left-------
                                                                                                                        57
                                                                                                                        6 400
                                                                                                                              0
                                                                                                                                          4 52, 800
                                                                                                                                           5 7, 800
    Do    ------------------------------------------                                       608    ___do-      .               0.                   0

                 SECOND DISTRICT, NEW ORLEANS

Kellogg Lake dike__         _____________         ---                                      626    Across lake           5 2, 500            5 2, 500
Sargent Point, La ___________________________________                                      626     Left                        0          4 5 1,000
Cannon Point, Miss .--------------------------------                                       629     Right and              1, 400          4 5 4, 500
                                                                                                     left.
Buckridge Crossing, La ______________________.. .                           ..             635     Left_....            5 6, 300          453, 800
                                 _
Brooks Crossing, M iss_ -_ ---------- -------  ---------                                   636    ___do. - _            5 3,000           452,000
Yucatan Bend_..______-_____-_______-___-----_                                              638     Across               52, 800               5 2, 800
                                                                                                    channel.
Grand Gulf Crossing, Miss_                                                                651      Right...             5 4, 500          45 4, 500
Hardscrabble Bend, Miss ._______--________------                                          653      Left .....           5 9, 800          4 5 2, 500
Bondurant Chute _________.__-___________                ___-- _                       -   656     __.do-----      .5    82, 200           45 4, 500
Waterproof Crossing, Miss -______.--   __--------------                                 - 680     ___do   ---.                                   40
Rifle Point, La ___________._________..._____.....                                        684      Right ..-                   0_                 00
Natches Island, Miss   ----------------------------------                                 709      Right and                   0          4a'4, 000
                                                                                                    left.
Fords Crossing, Miss ___________.____                     __.__________                    716    ___do       .__              0
                                                                                                                                              a
                                                                                                                                                  6, 000
Esperance Crossing, Miss.------------------------------                                    719     Left-------          5 3, 050          4 5 1, 600
         Total contraction works-                  -------------------------__                    ------------         938,   150        10   238, 925


   I Permeable pile dikes.
   24,889 linear feet of
                       permeable pile dikes have been removed since 1936 Annual Report. 2,989 linear feet,
Island 8; 850 linear feet, Point Pleasant; 500 linear feet, Bells Point; 550 linear feet Chute of Island 35.
   3 Permeable crib dikes.
   4 Sand dikes lost during 1937 high water as follows: Walker Bend, 800 linear feet; Youngs Point, 700 linear
feet; Racetrack Towhead (La.), 2,600 linear feet; Racetrack Towhead (Miss.), 500 linear feet; Kellogg Lake,
700 linear feet; Sargent Point, 4,200 linear feet; Cannon Point, 3,000 linear feet; Buckridge Crossing,
10,000 linear feet; Brooks Crossing, 3,800 linear feet; Grand Gulf, 1,200 linear feet; Hardscrabble Bend,
11,300 linear feet; Bondurant Chute, 3,200 linear feet; Waterproof Crossing, 1,000 linear feet; Rifle Point,
1,500 linear feet; Natchez Island, 7,400 linear feet; Fords Crossing, 7,200 linear feet; and Esperance Cross-
ing, 1,750 linear feet.
   5Sand dikes.
   6 Dike was not completed due to change in plans.

   7In addition to 400 linear feet built this year, grade was raised 20 feet on the 5,000 linear feet reported in
1936.
   8Dike secondary to corrective dredging.
   o 7.2 miles.
   1045.3 miles.
                          MISSISSIPPI RIVER COMMISSION                          1723
   Effect of dikes in channel adjustment.-Contractionworks are pri-
marily for the purpose of training and directing the low-water flow
through a single channel of project width and depth, having a de-
sirable alinement. The effectiveness of contraction works is depend-
ent, for the most part, on retarding the current through the dike area,
permitting the material in saltation and suspension to form an accre-
tion which induces an accelerated current over the crossing, causing
scour, and resulting in a fixed and deep-water channel.
   The effect of dikes in channel adjustment can be best exemplified
by the dikes in the vicinity of Island 13, Tenn. Prior to the con-
struction of this system of dikes at the head of the crossing, this
locality was a constant source of trouble to navigation, requiring
continuous dredging operations throughout the low-water season.
This dike system was completed late in 1932, and in less than 2 years
the dike area had accumulated an average fill of 11 feet. The result
of this fill is that a fixed channel has been obtained, with a desirable
alinement and sufficient width and depth of channel to eliminate
dredging in this locality throughout the low-water season.
   The sand dike built at Walker Bend (490)2 has been successful in
the purpose for which it was constructed, i. e., partially closing the
bendway channel to low-water flow, thereby increasing the discharge
through the pointway channel and causing subsequent enlargement
due to scour.
   The sand dike built at Opossum Chute (530) was built to divert
flow from left to right of Wildcat Towhead. The dike is still under
construction, so has not had sufficient time to develop.
   The rebuilding and extension downstream of the sand dike at
Youngs Point (596) has been partially successful in the purpose for
which it was designed, i. e., enlargement of the channel left of the
middle bar and a subsequent increase in its discharge.
   The series of experimental sand dikes placed in the Racetrack
reach (605-610) and the rebuilding of the sand dike at Racetrack
 (606) were successful in the purpose for which they were designed.
There has been a substantial development of the chute channel and
considerable filling at the head of the old bendway channel.
   The construction of contraction dikes has been pursued extensively
in the second New Orleans district for two types of channel condi-
tions. On river crossings where the channel is wide and shallow,
dikes have been used to confine the channel to a normal width such
that the resulting accelerated velocities would scour the confined area
to a depth which would fulfill the requirements of navigation and
also provide a more efficient channel for high water. In river
reaches where islands and cut-offs created two channels, cut-off dikes
have been built across the minor channel in order to develop or accel-
erate development of one main channel. The general effectiveness of
these dikes is marked by the lack of navigation trouble such that no
maintenance work has been required during the fiscal year. It is
believed that the full effect of the contraction work has not yet been
reached as the existing dikes are being improved and considerable
  2Figures in   parentheses denote distance in miles below Cairo, Ill., gage.
1724            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

time is required for the channel adjustments to reach full develop-
ment. During the fiscal year 1937, in the second New Orleans district,
work on crossing dikes has been pursued at Newtown Bend (626-633),
Buckridge crossing (635), Brooks crossing (636-637), Grand Gulf
crossing (648-651), Hardscrabble Bend (654), Waterproof crossing
 (676-678), and Esperance crossing (719). Cut-off dikes have been
built or reinforced at Kellogg Lake (626), old river above Yucatan
cut-off (638), and Natchez Island. The filling of the cave near the
Waverly Point levee (704) was also classed as contraction dredging.
                                                             LEVEES

  During the fiscal year ending June 30, 1937, 37,294,994 cubic yards
of earthwork were placed in levees, as follows:

                                                                                                   Cubic yards placed

                                                                                                           Above
                                      District                                            Below             Cape                  Repairs
                                                                                           Cape          Girardeau                (se   6
                                                                                         Girardeau       and tribu-                a    6
                                                                                          (sec. 1)1        taries                  and 7)1
                                                                                                          (sec. 6)1


Rock Island- ...          ......                               ....                 _         .20,
                                                                     ..-------------------------------------------.                       445
St. Louis..........................----------------------------------------------------------551,                   945               28, 024
Memphis .....-----------------------------------------------..                         4, 247, 487                                   710, 680
Vicksburg,_ ... ----------------------------------------------            .      . 10, 087, 972              576, 155        --
Second New Orleans ...--------------------------------------                         20, 967, 500 .......------------                104, 786
       Total.......................---------------------------------------------35,          302, 959.     1, 128, 100               863, 935

  1 "Sections" refer to sections of May 15, 1928, Flood Control Act.


  The costs and net expenditures for levees during the 12-month
period ending June 30, 1937, were as follows:

                                                                                  National Recovery                 Emergency Relief
                                                     Regular funds                 Administration                    Administration
                                                                                        funds                            funds
                                                                                             7                 'I             7              --

                                                               Net expend-                       Net ex-                           Net ex-
                                                  Costs           itures           Costs         pendi-              Costs         pendi-
                                                                                                  tures                             tures

        UNITED STATES FUNDS

Levees under par. 1 of sec. 6 of
   Flood Control Act approved
   May 15, 1928:
    St. Louis district........._.....     $48, 822. 76    $45, 490. 06 ..............................
    Vicksburg district _____               39, 136. 29     39, 136. 29 ..........
    Second New Orleans district___          3, 976. 61      -580. 29 .........
Levees under sec. 1 of Flood
  Control Act approved May 15,
  1928:
    Memphis district_______ ______ 3, 806, 113. 12 3, 756, 669. 37           $130. 95                 $85. 00 $76, 849. 87 $96, 234. 44
    Vicksburg district .........       2, 569, 030. 84 2, 571, 405. 61-------- -----------                      2,426.28 13, 973. 76
    Second New Orleans district___ 6, 420, 016. 071 6, 304, 106. 05 411, 015. 461 470, 136.85- ..                         I.....
                                                                                                                          I-
Levees under sec. 7 of Flood
  Control Act approved May 15,
  1928:
     Rock Island district ._____ _          4, 752. 59      4, 752.59
    St. Louis district_ .__...____ ___      9, 855. 57      9, 855. 57
    Memphis district__________..  ..      309, 508. 61    299, 217. 02
    Vicksburg district ............        25, 174.91      24, 797. 87
     Second New Orleans district..         11, 742.02      11, 752. 82

        Total United States funds -- 13, 248, 129. 39 13, 066, 602. 96 411, 146. 41 470,             221. 85        79, 276. 15 110, 208. 20
                                  MISSISSIPPI RIVER COMMISSION                                                                             1725

                                                                                    National Recovery                        Emergency Relief
                                                    Regular funds                    Administration                           Administration
                                                                                          funds                                   funds



                                                 Costs
                                                           Costs
                                                            Net expend-
                                                            Neexpnd-                  Costs
                                                                                                       Net ex-
                                                                                                       pendi-                  Costs
                                                                                                                                           Net ex-
                                                                                                                                           pendi-
                                                                                                         tures                              tures

       CONTRIBUTED FUNDS

Levees under sec.          6 of Flood
Control Act approved May 15,
1928:
   St. Louis district ........--------------     22, 785. 53      22, 785. 53 .....................................
   Vicksburg district .....
                          __        ______       19, 568. 15      19, 568. 15 _._.................................
   Second New Orleans district___                 1, 988.30        1, 988.30
      Total contributed funds .                  44, 341.98       44, 341.98..______                ___               .__,.......-------

      Grand total----.-..          -.. --.....13, 292, 471. 37 13, 110, 944.94 411, 146. 41 470, 221. 85 79, 276. 15 110, 208. 20


   On June 30, 1937, the estimated content of the levee lines already
up to or in process of construction to the approved grade and section
covering the Mississippi River from Rock Island, Ill., to Cape
Girardeau, Mo., and on the outlets and tributaries of the Mississippi
River between Rock Island and Head of Passes, La., insofar as such
outlets and tributaries are affected by backwater of the Mississippi
River on which data were available as provided for in section 6 of
the act of May 15, 1928, was about 87,713,127 7 cubic yards; about
48,464,757 cubic yards remain to be placed to complete the work.
The estimated content of the levee lines already up to or in process
of construction to the adopted project grade and section covering the
main river project levees from Cape Girardeau, Mo., to the Head of
Passes, La., as provided for in section 1 of the above act, was about
886,584,391 8 cubic yards; about 52,227,327 9 cubic yards remain to be
placed to complete this project. A total of 863,935 cubic yards was
placed in levees under sections 6 and 7 of the above act during the
fiscal year ended June 30, 1937 (maintenance and repairs); no esti-
mate can be made of the yardage remaining to be placed under
section 7.
   During the past 9 years more than 629,849,000 cubic yards have
been placed in levees (606,913,000 cubic yards under sec. 1 and
over 22,936,000 cubic yards under sec. 6 of the act dated May 15,
1928); in addition, some 8,669,000 cubic yards were placed under
sections 6 and 7 of the act during the same period (maintenance and
repairs). Yardage placed increased from 23,000,000 in fiscal year
1929 to over 107,538,000 in 1933 and to over 124,804,000 in 1934 (a,
record for yardage placed in 1 year); due to fewer contracts in force
in fiscal year 1935 together with unfavorable weather conditions
and prolonged high stages of the Mississippi River, only 65,946,000
cubic yards were placed; during fiscal year 1936, due to fewer con-
   8 Does not include yardage to be abandoned.   (See table 1. pp. 1730-1731.)
     Does not include yardage to be abandoned; the amount, however, does include
1,170,957 cubic yards in excess of the 1928 project grade and section placed in levee line
between Bonnet Carre' spillway and New Orleans to bring this levee line approximately
equal in strength to the better portions of the New Orleans river front levee. (See table
2. pp. 1732-1734.)
   * Revised, due to closer surveys; does not include yardage for Eudora and Morganza
floodways or outlet west of Berwick; detailed estimates of which are not available.
 (See table referred to in footnote 2.)
1726      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

tracts in force as a result of the near completion of the levees under
May 15 1928, Flood Control Act only 61,416,000 cubic yards were
placed; during the fiscal year 1937 due to fewer contracts in force
as a result of the near completion of the levees under May 15, 1928,
Flood Control Act only 36,431,000 cubic yards were placed; prices
gradually reduced from about 26.7 cents per cubic yard in 1929 to
about 15.5 cents per cubic yard in 1933; prices per cubic yard ad-
vanced slightly in 1934 (in the Memphis district work let under
contract with National Industrial Recovery Administration funds
averaged 21.9 cents per cubic yard, in the Vicksburg district 17
cents per cubic yard, and in the second New Orleans district over
47,250,000 cubic yards were placed at an average unit price of 19.4
cents per cubic yard). The average for work let during the fiscal
year 1935 in the Memphis district was 22.9 cents per cubic yard;
in the same fiscal year 30,778,000 cubic yards were placed in the
second New Orleans district at an average unit price of 23.02 cents
per cubic yard. During the fiscal year 1936 the average price for
levee work was 20.7 cents per cubic yard in the Memphis district and
18.1 cents per cubic yard in the Vicksburg district; in the second
New Orleans district 37,000,000 cubic yards were placed at an aver-
age price of 23 cents per cubic yard. During the fiscal year 1937
the average price for levee work was 20.45 cents per cubic yard in
the Memphis district and 20.8 cents per cubic yard in the Vicksburg
district; in the second New Orleans district 22,000,000 cubic yards
were placed at an average price of 22.05 cents per cubic yard.
   In the second New Orleans district, asphalt wave wash protection
was placed on old and new levees below New Orleans, as follows: Fis-
cal year 1935, 12,925 linear feet; fiscal year 1936, 56,447 linear feet;
fiscal year 1937, 23,484 linear feet.
   For the convenience of administration, allotment of funds, and
handling of local contributions for levee purposes, the Mississippi
River front below Rock Island, Ill., has been divided by the Federal
authorities into reaches designated as levee districts. In some in-
stances these reaches or districts embrace the river fronts of several
local levee organizations, the names and locations of which, as now
established, are as follows:
                                 MISSISSIPPI RIVER

                               Rock Island district

Rock Island to New Boston, Ill.; left bank (484 to 435 10).
Muscatine to mouth of Iowa River, Iowa; right bank (457 to 436 10)
Mouth of Iowa River to Burlington, Iowa; right bank (436 to 406 10).
Oquawka to Dallas, Ill.; left bank (418 to 39210).
Mouth of Des Moines River to La Grange, Mo.; right bank (364 to 338 10).
Warsaw to Quincy, Ill.; left bank (362 to 32910).
La Grange to Clarksville, Mo.; right bank (338 to 275 10)
Quincy to Hamburg Bay, Ill.; left bank (329 to 263 10).
                                St. Louis district

  Clarksville, Mo., to mouth of Missouri River, Mo.; right bank (275 to 19710).
  Mouth of Illinois River, Ill., to Prairie du Pont, Ill.; left bank (220 to 176 10).
  Mouth of Missouri River, Mo., to Cape Girardeau, Mo.; right bank (197
to 51 o).
so Miles above Cairo.
                        MISSISSIPPI RIVER COMMISSION                        1727
  Prairie du Pont to Grand Tower, Ill.; left bank (176 to 82 o).
  Grand Tower to Thebes, Ill.; left bank (82 to 46 10).

                                Memphis district
  Little River drainage district; right bank (4910).
  Thebes to Cairo, Ill.; left bank (46 to 010).
  Upper St. Francis levee district, vicinity of Cape Girardeau, to New Madrid,
Mo.; right bank (5410 to 71").
  Reelfoot levee district, Hickman, Ky., to Slough Landing, Tenn.; left bank
(36 to 6011).
   Slough Landing Neck dike; left bank (61 to 6511).
  Lower St. Francis levee district, vicinity of New Madrid, Mo., to mouth of
St. Francis River; right bank (71 to 298 1).
   Upper Yazoo levee district, from just below Memphis, Tenn., to the Bolivar-
Coahoma County line; left bank (227 to 36511).
  White River levee district, Helena, Ark., to White River; right bank (307
to 39111).
                                Vicksburg district
  Lower Yazoo levee district, Bolivar-Coahoma County line to mouth of Yazoo
River; left bank (365 to 6021).
  Upper Tensas levee district, one-half mile downstream from city limits of
Pine Bluff, Ark.; on the Arkansas River, 116 miles above its mouth, to opposite
Warrenton, Miss.; right bank (6091).
                           Second district, New Orleans

  Homochitto levee district, mouth of Yazoo River to Baton Rouge; left bank
(602 to 83411).
   Lower Tensas levee district, opposite Warrenton, Miss., to mouth of Red
River, including Palmyra Island; right bank (609 to 77211).
   Atchafalaya levee district, Red River to Bayou Lafourche; right bank (772
to 895 ").
   Lafourche levee district, Bayou Lafourche to Orleans levee district; right
bank (895 to 975").
   Barataria levee district, Orleans levee district to Head of Passes; right bank
 (989 to 1,070 ).
   Pontchartrain levee district, Baton Rouge to Orleans levee district; left bank
 (842 to 96611").
   Lake Borgne levee district, Orleans levee district to Head of Passes; left
bank (979 to 1,07011).
   Orleans levee district, composed of the parish of Orleans. It extends from
the Lafourche levee district to the Barataria levee district, right bank (975 to
989"1) and from the Pontchartrain
                             n
                                      levee district to the Lake Borgne levee dis-
trict, left bank (966 to 979 ).
  Local levee districts on tributaries of the Mississippi River up to
the limit of flood-control work as provided for under the approved
project are as follows:
                                St. Louis district

  Illinois River from mouth to mile 120, near Havana, Ill. (backwater limit) :
  Left bank: Nutwood, Eldred, Fairbanks (Keach), Hartwell, Hillview, Big
Swan, Scott County, Mauvaisterre and village of Naples, Coon Run, Willow
Creek, Meredosia Lake, Lower Indian Creek, and New Pankeys Pond Special,
Valley, city of Beardstown, South Beardstown, Lost Creek, and Hager Slough
Special, drainage, and levee districts.
  Right bank: Valley City, McGee Creek, Little Creek, Big Prairie, Crane Creek,
Coal Creek, Kelly Lake, Big Lake, West Mantanzas, Seahorn, Kerton Valley,
Langellier, and Lacey, drainage and levee districts.
  Wood River: Wood River drainage and levee district.
  Missouri River, from mouth to St. Charles, Mo., mile 27 (backwater limit):
  Right bank: St. Louis County levee district no. 1.
   Miles above Cairo.
  o10
  SMiles below Cairo.
      20196-37--pt. 1-109
1728     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                              Memphis district

  Ohio River from mouth to mouth of Cache River (act July 27, 1916) (back
water limit is above Shawneetown, Ill.):
Left bank: None.
  Right bank: Cairo, Mounds, and Shawneetown drainage districts.
White River from mouth to Peach Orchard Bluff, Ark. (backwater limit)
  Left bank: Clarendon and White River levee districts.
  Right bank: Little Red River levee district no. 1.
  St. Francis River from mouth to mouth of Tyronza River, just above Parkin.
Ark. (backwater limit) : No local districts.

                              Vicksburg district
  Arkansas River from mouth to the line between sections 10 and 11, T. 7 S.,
R. 5 W., fifth principal meridian, near Lake Point, Ark. (backwater limit);:
division line between Lincoln-Jefferson Counties, Ark. (act July 27, 1916); the
adopted project limit on south bank (act May 15, 1928) is one-half mile down-
stream from Pine Bluff city limits, Arkansas:
  Left bank: Farelly Lake, Jefferson County, and New Gascony levee districts.
  Right bank: Southeast Arkansas, Linwood-Auburn, and Frenchtown levee
districts.
  Ouachita River from mouth to vicinity of Lock and Dam No. 8, 330 miles
above mouth of Red River (backwater limit) :
  Left bank: Tensas Basin levee district.
  Yazoo River from mouth to mouth of Wolf Lake above Yazoo City, Miss.
(backwater limit) :
  Left bank: Rocky Bayou, Eden Bayou, and Willis Creek levee and drainage
districts.
  Right bank: Warren County and Atchafalaya levee and drainage districts.
                        Second district, New Orleans
   Red River, from mouth to Alexandria, La. (backwater limit); the adopted
project limit on south bank (act, May 15, 1928) is Boyce, La., thence along
Bayou Jean de Jean to Hotwell, La.:
   Left bank: Saline levee and drainage district. (Vicksburg engineer district.)
   Right bank: Red River, Atchafalaya, and Bayou Boeuf levee district from
Boyce to Moncla; Red River and Bayou des Glaises levee and drainage district
from Moncla to mouth of river.
   Atchafalaya River, from mouth to Morgan City, La.:
   West bank: Red River, Atchafalaya, and Bayou Boeuf levee district from
junction of the Atchafalaya and Bayou des Glaises at Simmesport, La., to Butte-
La Rose on the Atchafalaya River.
   East bank: Atchafalaya levee district.
  :(NoTa.-The Atchafalaya levee district includes entire basin down to Morgan
City, with the exception of the right-bank levee from Simmesport to Bayou
Courtableau. ).
   The following tabulations covering levee work under sections 1, 6,
and 7 of the act approved May 15, 1928, are similar to the tabula-
tions given in previous reports. The tabulations have been brought
up to date and show the present conditions of levees below Rock
Island, Ill., and levee operations during the 12 months ending June
30, 1937, as compiled from data submitted by the district engineers..
   The column "Estimated final contents" of the levees given in
table 1 is based on grades, sections, and quantities fixed pursuant to
section 6 of the project adopted by Congress May 15, 1928. The
same column of table 2 is based on grades, sections, and quantities,
as provided for in section 1 of the above act. Table 3 covers work
accomplished under sections 6 and 7 of the May 15, 1928, act, for
repairs of flood damage; the levees are reconstructed to their orig-
                    MISSISSIPPI RIVER COMMISSION                       1729
inal grade and section. Levees in the several districts that have
been completed to the approved grade and section are as follows:
Rock Island engineer district, 233.0 miles, section 6; St. Louis
engineer district, 175.0 miles, section 6; Memphis engineer district,
590.2 miles (586.3 miles, sec. 1, and 3.9 miles, sec. 6); Vicksburg
engineer district, 434.5 miles (396.5 miles, sec. 1, and 38.0 miles,
sec. 6); and second district, New Orleans, 824.3 miles (819.9 miles,
sec. 1, and .. 4 miles, sec. 6) ; total 2,257.0 miles (1,802.7 miles, sec. 1,
and 454.3 miles, sec. 6).
TABLE 1.-Present condition of Mississippi River levees from Rock Island, Ill., to Cape Girardeau, Mo., and on the tributariesand outlets of the
      Mississippi River between Rock Island and Head of Passes, insofar as such tributaries and outlets are affected by the backwater of the Mis-                                                                                                               a
      sissippi River; and levee operationsfor the 12 months, from July 1, 1936, to June 30, 1937, as provided for in section 6 of the act of May                                                                                                            0
      15, 1928

                                                                                                                                                                                                                               Percent
                                                                                   Contents                               Built          Total              Lost or         Contents                                             now         Approxi-
                                                                      Built to                                                                               aban-                                                                           mate a
                                          In system                                                   Built                                                                                                                                                     O
   Name of engineer district and              when        Built       approved     June30,          sinceby         since by                uilt             doed           J une30,       Required Estimated built to mate area
                                                         existing       grade        1936,           United           local                                  sine              1937,        to corn-   final  approved protected
      reacho oreeelevee district
      reach             district                m-       levees          and       existing           tates         authori-           June30,              June 30,        existing          plete  contents   grade   existing                                H
                                                  pleted               section      levees           States               ties             1936               1936           levees                                             and           levees
                                                                                                                                                                                                                               section                          O

Rock Island engineer district:                Miles       Miles        Miles       Cu. yds.      Cu. yds.      Cu. yde.        Cu. yds.                     Cu. yds.        Cu. yds.     Cu. yds.             Cu. yds.                        Sq. mi.
   Rock Island to New Boston, Ill.               31.4        31.4         31. 4    4, 319, 840 .          _----------------------------                                                ........--
                                                                                                                                                                            4, 319, 840-------                4,319,840             100. 0          44
   Muscatine to mouth of Iowa                                                                                                                                                                                                                                   Q
     River, Iowa 2_____         _                23. 8        23.8         23. 8    2, 675, 852--..---..        ..----.......-----                         ......---------- 2, 675, 852---------
                                                                                                                                                        ----------                                             2,675, 852           100.0              34
   Mouth of Iowa River to Bur-
     lington, Iowa 3_______---                   34. 7        34. 7        34. 7   43, 405, 832 ----------
                                                                                                 .....                 ...       ...
                                                                                                                       ...--------... ------ ----------                      3, 405, 832----------             3, 405, 832          100. 0             70       O
   Oquawka to Dallas, Ill.5 _---.                20. 3        20. 3        15. 3    2, 496, 369 ._            ------......
                                                                                                               _               --------      ---------                       2, 496, 369   33, 959             2, 530, 328           98. 7             29
    Mouth of Des Moines River to
                    6
      La Grange, Mo. _------------
    Warsaw to Quincy, Ill --        _.-_
                                                 21.4
                                                 40. 8
                                                              21.4
                                                              40. 8
                                                                           21. 4
                                                                           40. 8
                                                                                     1,640, 943
                                                                                     3, 018, 574
                                                                                                    ........----------....--------..
                                                                                                   .........--.....------
                                                                                                                                        -------..----------...
                                                                                                                                   --------------- --__.
                                                                                                                                                                             1,640, 943 .....----------...
                                                                                                                                                                             3, 018, 574 ........----------
                                                                                                                                                                                                               1,640,
                                                                                                                                                                                                               3, 018,
                                                                                                                                                                                                                         943
                                                                                                                                                                                                                         574
                                                                                                                                                                                                                                    100. 0
                                                                                                                                                                                                                                    100. 0
                                                                                                                                                                                                                                                    30
                                                                                                                                                                                                                                                    74
                                                                                                                                                                                                                                                                z
    La Grange to Clarksville, Mo_                15. 1        15. 1        15. 1     1,236, 927     ......-- __                         __------------      ----.            1,236, 927----------...           1,236,    927        100. 0          17
    Quincy to Hamburg Bay, Ill___                53. 0        53.0         50.5    8 7, 583, 855   .__          _ _- _ _------------------------ __                         87, 583, 855      271,647          7, 855,   502         96. 5         172          t
                                                                                                                                                                                                                                                                    2
St. Louis engineer district:
    Clarksville, Mo., to mouth of                                                                                                                                                                                                                           V

                                                                                                                                                                                                                                                                    /2
      Missouri River ---------- _ -              65. 5        65. 5        56. 1    3,930, 000---------                              --------------------
                                                                                                                                      ....-----..                            3, 930, 000       182, 500        4, 112,500            95. 6             49
    Mouth of Illinois River to
      Prairie du Pont, Ill ..........            49. 1        49. 1         1. 8            ........---.
                                                                                    5,203,410-------                        1,000             1,000----------5,204,410                      4,914,000         10,118,410             51.4          115          V-




    Prairie du Pont to Grand
      Tower, Ill -- _       ..--------- - -      90. 0        87.0          0       2,825, 800----------                    5,000             5,000----------                2,830, 800 11,391,200            14,222,000             19. 9         167
    Mouth of Missouri River to                                                                                                                                                                                                                              v




      Cape Girardeau, Mo .....-                  64. 8        56. 1         0       2,982, 000       ------           ---------------- ----------                            2,982,000      7,993,000         10, 975,000            27. 2             59
    Grand Tower to Thebes, Ill.9 Io              66. 0        66. 0         2.8     3,817,042_----_          ----------              --------------------                    3,817,042 8,527,329              12, 344, 371           30.9              84
    Havana to Beardstown, Ill.
       (Illinois River)-      -                  31.6         31.6          0       4,583,435           71, 137            25,132           96,269              --           4,679,704 3,920,296               8,600,000             54. 4             30
    Beardstown, Ill. to mouth of
     Illinois River (Illinois River)            203. 6      203. 6        114.3 1134, 764, 313         449,676 ----------                 449,676-           __-- _ 11 35,213, 989 8, 093, 483 1242, 307,472                      is80. 9          194
Memphis engineer district: Shawn-
eetown, Ill. (Ohio River)..----------.           3. 9         3. 9         3. 9       966, 062 __----------          ----------------                                          966, 062- .........            - 9,      062        100. 0              2
Vicksburg engineer district: 14
    Rocky Bayou levee and drain-
     age district (Yazoo River,
     Miss.) -----------------------              19.0         19.0          1.3        278, 216 ---------- -----------------------                                     --       278, 216       124, 784          403, 000            69. 0             27
    Tensas Basin levee district,
     Monroe to Sandy Bayou
     (left bank Ouachita River,
     La.) .          .     ...------------------------
                                                 69. 8     32. 7    32. 7      951, 708     576, 155                     576, 155--------       1, 527, 863   2,448,845      3, 976, 708     38. 4          190
    Atchafalaya drainage and levee
      district (right bank Yazoo
      River, Miss.)-----------------             13. 3     13. 3     4. 0      371, 286 ------------------------------------                      371, 286        563, 714     935, 000      39. 7          156
Second district, New Orleans:
    Saline (left or north bank Red
      River):
        Beaver levee 15    -----
                           ____  _              1i 2. 9   162. 9   162. 9      399, 780--.------         -------------------                      399, 780 ----------          399, 780     100. 0   (17)
       Lower Beaver levee _  ...                1s1. 3    18s
                                                            1. 3   is 1. 3     109, 082-------........................               . _._        109, 082- ......    _        109, 082     100. 0   (17)
    South bank Red River Ware's
      Landing levee (item 570.5) _              190. 2    190. 2   190. 2       24, 701    .       .----------
                                                                                                     __
                                                                                                     -------           _ _      __      ____       24, 701    -       _         24, 701     100.0    (20)
        Total...._____ _______          -___    921. 5    872. 7   454. 3 1187, 585, 027 1, 096, 968    31, 132                 --------
                                                                                                                     1, 128, 100 _-11          88, 713, 127 48, 464, 757 136, 177, 884     2164. 4    1, 543      -


     1 Regardless of grade and section.
     2 Includes 1.8 miles of levee along Iowa River, left bank, from mouth to bluffs, and 0.9 mile along both banks of Michael Creek, in Louisa County levee district no. 15.
     8 Includes 6.8 miles of levee along Iowa River, right bank, from mouth to bluffs, in Iowa River-Flint Creek levee district no. 16.
     4 Does not include 5,474 cubic yards placed in filling crevasses in Keithsburg drainage district, Ill., in 1929.
     5 Includes 3.3 miles of levee along Henderson River, right bank, from mouth to high ground in Henderson County drainage district no. 3 and 2.5 miles along Henderson River,
left bank, from mouth to high ground in Henderson County drainage district no. 1.
     6 Includes 8.3 miles of levee along Des Moines River, right bank, and 6.3 miles of levee along Fox River, left bank, in Des Moines-Mississippi levee district no. 1, Mo.
     7 Does not include 118,810 cubic yards placed in filling crevasses in Indian Grave district in 1929.
     8 Does not include 5,100 cubic yards placed in filling crevasses in South Quincy drainage and levee district in 1929 and 1930.
     9 Reach previously reported as Grand Tower to Gale, Ill.
     10oIncludes 5.7 miles of levee along Big Muddy River, left bank, from mouth to bluffs in Preston levee and drainage district.
     11Includes 1,000,000 cubic yards to be abandoned in the course of construction of new levee.
     12 The estimated final contents equals contents June 30, 1937, plus the yardage required to complete to grade and section, minus the yardage to be abandoned in the course of
construction.
     13 Percentage of completion arrived at as follows: Subtract the amount required to complete from the estimated final contents, dividing the remainder by the amount given under
estimated final contents.
    14See also table 3, pp. 1735-1737 for Farelly Lake levee work.
    15This locality is within the jurisdiction of the Vicksburg engineer district.
    16This mileage applies to Beaver levee only.
    17Included in area protected by levee system in Saline levee district.
    18 This mileage applies to Lower Beaver levee only.
    19 This mileage applies to Ware's Landing levee only.
    20Included in area protected by Red River, Atchafalaya, and Bayou Boeuf levee district.
    21Percentage 64.4 arrived at by subtracting 1,000,000 cubic yards (to be abandoned in the course of construction, Beardstown, Ill., to mouth of Illinois River) from 88,713,127 (con-
tents 1937) and dividing the remainder by 136,177,884 (estimated final contents).
TABLE 2.-Present condition of main river levees, from Cape Girardeau, Mo., to Hlead of Passes, La., and levee operations for the 12 months
                         from July 1, 1936, to June 30, 1937, as provided for in section 1 of the act of May 15, 1928


                                                                                                                                                    Lost                                                          Percent Al pprox-
                                          In sys-                     Built to  Contents       Built                 Built          Total         or aban-                                                          now      innate
Name of engineer district and             tem         Built          adopted June 30, 1936, since by                                built                          Contents               Required               built to are a pro-
                                           when       existing         grade                                       since by         since          doned
                                                                                                                                                                 June 30, 1937,
                                                                                                                                                                                                     Estimated
                                                                                                                                                                                           to com- final contents adopted   te cted
    reach or levee district                com-       levees 1        and sec-  existing      United               local au-                       since
                                                                                 levees       States               thorities       June 30,
                                                                                                                                                  June 30,       existing levees             plete                 grade   wilth ex-
                                          pleted                        tion                                                         1936
                                                                                                                                                    1936                                                          and sec-   is1ting                                    O
                                                                                                                                                                                                                    tion    le vees
                                                           r      I     -   --    -   --     ---       -      I-   -           I                                i                      I                 I                          I                 I



Memphis engineer district:                                                                                                                                                                                                                                              O
    Little River drainage dis-           Miles       Miles        Miles         Cu. yds.        Cu. yds. Cu. yds.                  Cu. yds.       Cu. yds.           Cu. yds.      Cu. yds.                       Cu. yds.                                Sq .mi.
      trict-_-_ .-.- ..---         .-        2 19.7      2 19. 7    2 19. 7       4, 796, 926                                                                          4, 796, 926                                   4, 796, 926           100.0                 400
    Thebes to Cairo, Ill .....
    Cache River levee .......
                                              3 9.7
                                              55. 3
                                                           3 9. 7
                                                           55.
                                                                      3 9.7
                                                                      55. 3
                                                                                  4, 256, 968       367, 814
                                                                                  1, 797, 753 ---....
                                                                                                                                     367, 814                          4, 624, 782
                                                                                                                                                                       1, 797, 753
                                                                                                                                                                                                                   4 4, 624, 782
                                                                                                                                                                                                                     1, 797, 753
                                                                                                                                                                                                                                           100. 0
                                                                                                                                                                                                                                           100. 0
                                                                                                                                                                                                                                                          }       11
                                                                                                                                                                                                                                                                        C



    Ohio River_.---            -             6 14. 0     6 14.      6 14.0        3, 488,048                                                     ...2 402 371          3,488,048                                     3, 488, 048           100. 0                 12
    Upper St. Francis .._____              7 132. 8     8 131.4      131.4       34, 485, 857 2, 809, 872                          2, 809, 872 o2, 402, 371           34, 893, 358   557, 081                     435, 450, 439          to 98. 4                700
    Lower St. Francis ........             11213. 9    11213.     11213.         99, 382, 262       315, 151                          315, 151                        99, 697, 413                                4 99, 697, 413           100. 0              3, 500
    White River...........____              12 73.6     1273. 6       73. C                                                                                                                                                              1o99.9                         0
                                                                                 53, 027, 112       513, 410                         513, 410                         53, 540, 522  4 56, 590                     4 53, 597, 112                                 910
    Reelfoot..-----------_ -                1322. 6      1322. 6   13 22. 6       8, 831, 189                                                                          8, 831, 189                                   8, 831, 189           100. 0                310
    Slough Landing neck dike-                14 9. 1         7.         3.1          850, 000         49, 677                         49, 677 1 105, 824                  793, 853 S437, 00(                        41, 230, 853          to 64. 5               16 5
    Upper Yazoo__...___.......              1793. 6      1793. 6   17 93.        79, 136, 463       191, 563                         191, 563 ..........              79, 328, 026  4 12. 286                     4 79, 340, 312         1o99. 9               3,281
Vicksburg engineer district:
    Lower Yazoo, east bank
      Mississippi River, Miss.            18s177. 4    18177. 4 18 177. 4       133, 744, 121 4, 058, 438---------                 4, 058, 438 19120, 500            137, 682, 059 1, 611, 351                    139, 293, 410         to2098. 8              2,140
    Pine Bluff, Ark., south
      bank Arkansas River,
      Ark- -----..............               211.9        21 1.      21 1. 9         103,880                                                                               103, 880            ___,                      103, 880          100. 0
    Upper Tensas:
        South bank, Arkansas
          River, Ark.. ____              22 23 84. 7 22 23 84. 7      66.9       25, 924, 526      899, 539 ---------                899, 539     24203, 90            26, 620, 165- ........                     426, 620,   165          100. 0
        West bank,Mississippi                                                                                                                                                                                                                                  2, 000
          R iv er, Ark . . . . . .. . 22 232574.8 22 232574. 8        33.5       45, 898, 862 4, 963, 866         S                4, 963, 866   243,575,00(           47, 287, 728 42, 159, 395                  4 49, 447, 123         to 95. 6
        West bank, Missis-
          sippi River, La......                72. 6       72. 6      72. 6      57, 025, 041       150, 665                         150, 665-                         57,175, 706          4 595, 456            S57, 771, 162          1099. 0
Tensas Basin: Ouachita River,
east and west banks. . (Bas-
trop to Monroe,29La.6_ .__.                2745. 0     2844. 2    2s 44. 2       4, 781, 814         15, 464- .._____._              15,'464 _!-_______                4, 797, 2781           (28)                44,   797, 278       28 100. 0                 50
Eudora floodway           -
Second district, New Orleans:
    Lower Tensas- -..........
   Atchafalaya (front)........
                                             156.8
                                             127. 3
                                                          156. 8
                                                      . 127.3
                                                                     111. 5
                                                                     107. 0
                                                                                 71, 236, 716      250, 841 ..........                250, 849                       0....
                                                                                                                                                                     o 71, 487, 565 11, 306, 614              3178, 021, 726             10 85.   5            2, 242   C
                                                                                                                                                                                                                                                                        -'1
                                                                                 55, 512, 161      374, 211 .....          .          374, 212  24 63, 200          30so55, 823, 173         2, 704, 654      3153, 000, 000             10 94. 9              5, 418
   Lafourche_                                  81.8        81.8       80.5 j 23310,  051,400       669, 08( .....
                                                                                                    111, 66
                                                                                                                           .          669,080 24 592, 300           30 10, 128, 180          8, 228, 980      8111,456, 038              1o28. 21              2 248
                                                                                  7, 478, 142                      __...
                                                                                                                 .....                111,669 2480, 200                7, 509, 611           s3 210,181           3   7, 719, 800        to97. 3               2,
   Barataria----                               71.9        71.9       45. 2       7, 100, 552      206, 526 ....         .            206, 526 24 120, 400           307, 186, 678           1, 293, 474          316, 410, 480          10 79. 8             (s6)
    Pontchartrain ............               126.         126. 0     122. 1 j 32 34, 652, 330 474, 01                                 474,012 24 366, 100           30 34, 760, 242              359, 088     3134, 800, 720
                                                                                                                                                                                                             1s   a387, 665, 759
                                                                                                                                                                                                                                         10 99. O              1028
                                                                                                                                                                                                                                                               1,028
                                                                               83 7, 249,895    1,847, 521 ..-.......              1, 847, 521 24260, 700            378, 836, 716         ......... _                                     100. O
    1 Regardless of grade and section.
    2 Includes 14.1 miles in main-line diversion levee; 2.7 miles Ramsey Creek levee; and 2.9 miles in Sals Creek levee.
    3 Includes 6.3 miles of Cairo drainage district (Mississippi River) levee; and 3.4 miles of Cairo front (Mississippi River) levee.
    4 Revised due to closer surveys and new locations.
    5 This levee extends along the south side of Cache River and connects the Mississippi River levee and Ohio River levee.
    6 Includes 5.3 miles from Cache River levee to lower end of sea wall at Cairo; and 8.7 miles of Mounds and Mound City, Ill., levee.
    7 Includes 84.3 miles of Mississippi front-line levee from Commerce to New Madrid, Mo.; 34.5 miles of Birds Point-New Madrid set-back levee; and 14 miles of New Madrid-
Sikeston Ridge (St. Johns Bayou levee).
    8 Reduced since last report due to loss during the January-February 1937 flood.
    * Includes 397,223 cubic yards abandoned due to construction of new levee; and 2,005,148 cubic yards lost due to crevasses.
     10Percentage of completion arrived at as follows: Subtract amount required to complete from estimated final contents, dividing the remainder by the amount given under esti-
mated final contents.
    11Includes 213.9 miles of Mississippi River front-line levee from New Madrid, Mo., to mouth of St. Francis River, Ark.
     12Includes 67.0 miles of Mississippi River front-line levee from Helena, Ark., to mouth of White River; and 6.6 miles of Laconia back-circle levee.
    13 Includes 1.4 miles of Hickman front levee and 21.2 miles of Mississippi River front-line levee.
     14This levee gives partial protection only.
    15Lost due to crevasses.
    16Partially protected.
     17Includes 93.6 miles of levee from Lake Cormorant, Miss., to Coahoma-Bolivar County line, Mississippi.                                                                                  00
    18Includes 0.8 mile concrete levee wall and 0.9 mile earth levee on Vicksburg city front.
    1o Lost due to 1937 high-water damage on Greenville Harbor dike.
    20 System 100 percent complete except for replacement, repairs, and dike construction.
    21Includes 0.2 mile concrete levee wall.                    •
     22Mileage revised due to construction of new levee.
     23Includes fuse plug levee not to be enlarged to adopted grade and section (on the Arkansas River the fuse plug extends from Yancopin to Cypress Creek, 17.8 miles; on the Missis-
sippi River the fuse plug levee extends from Cypress Creek to Vaucluse, 41.3 miles).
    24Abandoned due to construction of new levee.
    25Mileage revised due to construction of new levee, Lucca Landing to Arkansas City, Ark.
    26Previously reported as Boeuf floodway in Louisiana.
    27Includes 2.85 miles concrete levee wall.
     28There remains 0.8 mile of concrete levee wall under construction.                                                                                                                      0
    29Eudora floodway supersedes Boeuf floodway in Arkansas and Louisiana and previous estimates of contents, etc., have been eliminated. At this time no estimate is available
for Eudora floodway pending detailed studies. The Eudora floodway was authorized by act approved June 15, 1936.
    30 These figures include yardage to be abandoned in the course of construction, the total to be abandoned being 21,318,865 cubic yards, as follows: Lower Tensas levee districts
4,772,453 cubic yards; Atchafalaya (front) levee district, 5,527.827 cubic yards; Lafourche levee district (above Bonnet Carre), 6,901,122 cubic yards; Barataria levee district, 2,069,672
cubic yards; Pontchartrain levee district (above Bonnet Carre), 318,610 cubic yards; Lake Borgne levee district, 1,359,181 cubic yards; Red River, Atchafalaya, and Bayou Boeuf levee
district, 370,000 cubic yards.
     31The estimated final contents equals contents June 30, 1937, plus the yardage required to complete to grade and section, minus the yardage to be abandoned in the course of             O
construction.
     3sAbove Bonnet Carre spillway.
      3sBelow Bonnet Carre spillway.
     34 Estimated amount required to reconstruct levees due to caving banks in Lafourche levee district, below Bonnet Carre spillway (210,189 cubic yards); and to construct new levees
due to caving banks in Red River, Atchafalaya, and Bayou Boeuf (16,328 cubic yards).
     a5 Revised due to yardage abandoned during fiscal year and closer surveys.
     36Included in Lafourche levee district.
     37This figure includes 1,170,957 cubic yards placed in levee between Bonnet Carre spillway and New Orleans in excess of 1928 section, in order to make this levee approximately
equal in strength to the better portions of the New Orleans river-front levee.
     38 These figures do not include 1,170,957 cubic yards in excess of 1928 section, which was placed in Pontchartrain levee below Bonnet Carre spillway.
     39Percentage of completion arrived at by subtracting 1,170,957 cubic yards (built in excess of 1928 section between Bonnet Carre and New Orleans) from contents June 30, 1937,
and dividing re E ainder by amount given under estimated final contents.
TABLE 2.--Present condition of main river levees, from Cape Girardeau,Mo., to Head of Passes, La., and levee operations for the 12 months
                  from July 1, 1936, to June 30, 1937, as provided for for in section 1 of the act of May 15, 1928-Continued

                                                                                                                                      Lost                                                           Percent Approx-
                                    In sys-                  Built to                                                   Total                                                                          now     imate
            leveeordistrict
          reach
Name of engineer   district and       tern       Built       adopted                                                    built       orContents                 Required                 Estimate     built to area
                                     when       existing      grade   June30,1936,         since by      since by                    donediate                                                       adopted   tec pro-
                                     cor-
                                     co-        levees
                                                levees       andsec-    existing
                                                                         levees            United
                                                                                           States       localau"
                                                                                                        thorities       since30,
                                                                                                                      June              e       June 30,1937,
                                                                                                                                               existing levees tocor-
                                                                                                                                                                plete                 final contents grade
                                                                                                                                                                                                       ade with teeex-
                                    pleted                     tion                                                      1936       June 30,                                                         and sec-  isting               0
                                                                                                                                      1936                                                             tion    levees
                                                                                                                                                                                                                                    y
                                                                                                                                                                                                                                    O
                                                                                                                                                                                                                                    ©
Second district, New Orleans-
  Continued.
    Bonnet Carre spillway side     Miles     Miles     Miles               Cu. yds.       Cu. yds. Cu. yds. Cu. yds.         Cu. yds.                Cu. yds.       Cu. yds.            Cu. yds.                  Sq. mi.           ©
      levees-------------------        11.8      11.8     11.8              11,084,  982------_    _ _---------- --------------------.                11, 084, 982-      _- _            11,084, 982        100.0 --...
    Lake Borgne_-------------          47. 9    47. 9     34. 2              6, 642, 413            .......---. 237, 536 24160, 000
                                                                                            237, 536-------                                          30 6, 719, 949 40 762, 464         316, 123, 232      10 87. 5    731
    Red River, Atchafalaya
      and Bayou Boeuf .......         125. 5   125. 5    108. 9             19, 939, 226             .......--- 483, 672 24480, 000
                                                                                            483, 672-------                                           3019, 942,   898 3416, 328             589, 226
                                                                                                                                                                                        31 19,             10 99. 9    1,326
                                                                                                                                                                                                                                    z©
    Atchafalaya (back) _......         53. 1     53. 1    46. 5             12, 860, 014     90, 650 ..---...-------      90, 650 ..----------          12, 950,   664 1, 022, 683        13, 973,   347   to 92. 7   (41)          0
    Bordelonville, west ....           11. 8     11. 8    11. 8              2, 976, 429------- ----------           ----------......----------          2, 976,   429 ----------          2, 976,   429    100.0     (42)
    West Atchafalaya Basin__        43131. 8   101. 9     80. 1             51, 531, 177 8, 442, 930 ...---------     8, 442, 930 .       ..---------- 59, 974,    107 11, 557, 070       71, 531,   177   10 83. 8   (42)
    East Atchafalaya Basin __         117. 6       44
                                                 90. 2    54. 5             22, 528, 076 7, 718, 722-------
                                                                                                     ........--       7, 718, 722 ........              30, 246,   798 5, 953, 202        36, 200,   000   10 83. 6   (41)
    Ring levees: Simmesport,                                                                                                                                                                                                    u




      Melville, Morgan City,                                                                                                                                                                                                        0
      Ferriday----------------         26. 9   457.4       5. 8              2, 756, 457      60,121    ----------        60,121                        2, 816, 578     3, 383, 422        6, 200, 000     1045. 4    (48)
   Morganza floodway 47.
    O utlet west of Berw ick 47. _.     .       .       ..                                     ..                                                                                        ...               .

     Total......-----------------    2,140. 9    2, 060. 6    1, 802. 7 48 881, 130, 792 35, 302, 959    ..--------   35, 302, 959 8, 530, 495 3749907, 903, 256 52, 227, 327 3138 937, 640, 761           50o
                                                                                                                                                                                                            94. 4     26, 312

    For footnotes 1 to 39 see preceding page.
    40o462,464 cubic yards of this amount will be required to construct new levees to replace levees threatened by caving banks.
    41Included in Atchafalaya front levee district.
   42  Included in Red River, Atchafalaya, and Bayou Boeuf levee district.
    43Includes 8.3 miles of Bordelonville-Hamburg levee.
    44Includes 4.4 miles emergency levee built from Viva, La., to Morganza, La., to connect East Atchafalaya Basin protection levee with main Mississippi River levee.
     45Includes 1.6 miles emergency ring levee around Simmesport, La.
    46 Included in respective levee districts.
    47Authorized by act approved June 15, 1936; no detailed estimates available at this time.
    48Includes yardage to be abandoned in the course of construction.
                                                                                                                                                                                                                                    -
                                                                                                                                                                                                                                    C
    49Includes 21,318,865 cubic yards not up to project grade and section to be abandoned in the course of construction.
    50 Percentage of 94.4 arrived at by subtracting 21,318,865 cubic yards (to be abandoned in the course of construction) and 1,170,957 cubic yards (built in excess of 1928 section, be-
tween Bonnet Carre spillway and New Orleans), from 907,903,256 (contents June 1937) and dividing the remainder by 937,640,761 (estimated final contents). The percentage of com-
pletion of works under section 1 of the project excluding Atchafalaya floodway and ring levees (113,931,177 cubic yards) is 96.2. The above yardage and percentages do not include
Eudora floodway or Morganza floodway nor outlet west of Berwick, as detailed studies are being made at this time.
                                      MISSISSIPPI RIVER COMMISSION                                                            1735
TABLE 3.-Yardage placed during 12 months, from July 1,1936, to June 30, 1937,
  in repairing levees on tributaries of the Mississippi River threatened or
  destroyed by flood, including the flood of 1927, as provided for in sec. 7 of the
  act of May 15, 1928

                                                                               Built since Total built Remaining             Percent
                             Levee district                                    July 1, 1936 under sec. 7 to be built        complete


               ROCK ISLAND ENGINEER DISTRICT
Iowa River:                                                                         Cubic yards Cubic yards Cubic yards
     Louisa levee districts nos. 8 and 11, Iowa- ._-_-.--------------                                    51, 955  None           100. 0
     Levee district no. 14, Louisa County, Iowa .----..                                  ...----------   26,222   None           100. 0
     O. L. Asby       ---------------------------------                             ------------          2,006   None           100.0
Cedar River:
     Muscatine County, Iowa___ _______________________  .-..                                             22, 083  None           100. 0
     Foley levee and Estle levee, Muscatine County,
       Iowa.     ------------------------------------------------                                        28,773   None           100.0
     Klein levee district_-----------------------------                                    20, 445       20, 445  None           100. 0
North Fabius River: H. A. Wehrman levee                                  ...----------------------       27, 703  None           100. 0
Rocky Run Diversion Channel: Hunt drainage dis-
  trict, Iowa ___________________                                ______                              16,     253
                                                                                                             508
                                                                                                                  None
                                                                                                                  None
                                                                                                                                 100. 0
                                                                                                                                 100. 0
Mill Creek : Vicinity Milan, Ill.... _________________.._... .......
Fox River: Mississippi-Fox River drainage district,
  Missouri ------------------........                        -----------                                 13,860   None           100.0
Ellison Creek: 2
     Vicinity of Shokoken, Ill- .--.                 _____-- --.... __                               _3,
                                                                                                    -_       462  None           100. 0
                                                ..--
     Vicinity of Gladstone, Ill _____________.......
                                       .                                   _ __.                  .      16, 000  None           100. 0
Hadley Creek: Hadley Creek subdistrict of Sny Island
  levee drainage district, Illinois ___________________                                                  31, 706  None           100. 0
Skunk River: Green Bay levee drainage district no. 2,
  Iowa-__-___--___---_.__                          _ _........
      Ioa-----------------------------------------------                                      ------------       27,618
                                                                                                                 2,10              0

                  ST. LOUIS ENGINEER DISTRICT

Mississippi River: Perry County no. 3, Missouri- -_.-_----------                                        1, 437      None         100. 0
Cinque Hommes and Bois Brule Creeks:
     Perry County no. 1, Missouri--------------------------------                                        470        None         100. 0
     Perry County no. 2, Missouri------------------- ------------                                      1,525        None         100. 0
     Perry County no. 3, Missouri --          ___              16, 567                                29,167        None         100. 0
Clear Creek: Clear Creek drainage and levee district--         11, 457                                11,457        None         100. 0
Illinois River:
     Meredosia Lake levee .------------ ------------------------.                                       6, 270      None         100. 0
     Lost Creek levee..........
                           __ __ ...    __......._  _             --   .                                4,139       None         100.0

                  MEMPHIS ENGINEER DISTRICT

Arkansas River:
     Conway County levee district no. 1                ---------------------------                       93,872     None         100. 0
    Conway County levee district no. 2 __..-------------                              ------             18, 967    None         100. 0
    Conway County levee district no. 6 __....___                         ___-------- .....               55,960     None         100.0
    Crawford County levee district_ ..... __.__---__-                                          -____ 1, 400,956     None         100. 0
    Carden Bottoms levee district__---       ...___             ___          _          4, 431           25, 283    None         100. 0
                                       ---
    B. W. Pinson levee district ------------------ -.                           -------                    2, 288   None         100. 0
    Meredosia Lake levee ___----.--                                            -9,                            216   None         100. 0
    Dardanelle drainage district, Yell County, Ark _--                                 19, 099           52, 538    None         100. 0
    Faulkner County levee district no. 2- ________--                       ------------
                                                                             __                          38, 977    None         100. 0
    Fourche Island levee district_                 _          -       --------                           57, 516    None         100.0
    Fourche Place levee district ______________________.                             ___        _          1,331    None         100.0
    Logan County levee district he. 1 __-_______________-...______                                         1,500    None         100. 0
    Logan County levee district no. 3 --------------- ------------                                       23,874     None         100.0
     Oberste levee    --------------------------------------------                                         3, 979   None         100. 0
    Perry County levee district no. 1_                                                                   13, 234
                                                                                  _----------------_------------    None         100.0
    Plum Bayou levee          ---------------------------------------                                    60, 636    None         100. 0
         Do-.............    ........................                                171,864            171,864       749         99.6
    Pope County, Ark., drainage and levee district no. 1_                              11, 286           19,479     None         100. 0
    Yell County levee district no. 1                       ...--------------------
                                                                                ____                     36,630     None         100. 0
Black River:
    Curia Creek levee district--_                                               __-__.....               16, 929    None         100. 0
    Western Clay drainage district no. 1-----                    -       -____-         1, 950           37,103     None         100.0
     Western Clay drainage district no. 2_..... __ .                           ___-__--.... _              5, 440   None         100. 0
Little Red River:
     Little Red River levee district no. 1--------------------------                                     46, 656    None         100.0
    Little Red River levee district no. 2----------------                              18,371            31,570     None         100.0
Neosho River:
    Allen levee district_ ___-_____ _____________ __                               -_ 1, 756               6, 511   None         100. 0
     Barnhardt Farm levee-.............
                                      _____                        ____ _-----___                             550   None         100.0
    Blair Farm levee._____.______              _____________            __-__                   -______ 2.339       None         100. 0
    Brown levee...-    --------------------------------------                                              3, 085   None         100. 0
    Brogan levee district-...---------------------------....37,                             427           bl, 345   None         100.0
     Butler levee district      _-----------------------------                           5, 269            5,269    None         100.0
     Council Grove, Kans., improvement district_ ..............                                            9, 868   None         100.0
     Delos-Johnson levee district .......
                                        -       -..
                                                 _...-....       2, 673      6, 617       None                                   100. O
  IJA total of 500 linear feet of revetment was placed on levee of Hunt drainage district, Illinois.
  I Located in Henderson County drainage district no. 2, Illinois.
1736                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

TAnri    3.-Yardage placed during 12 months, from July 1, 1936 to June 30, 1937,
    in repairing levees on tributaries of the Mississippi River threatened or
    destroyed by flood, including the flood of 1927, as provided for in sec. 7 of the
    act of May 15, 1928-Continued

                                                                                    Built since Total built Remaining                          Percent
                                   LeveJuly                                              1, 1936 under sec. 7 to be built                     complete


Neosho Rsver--Continued.                                                                  Cubic yards Cubic yards Cubicyards
    Dutton levee district ---___.......                         --
                                                        .............                _              14,472                 28, 791   None         100. 0
    Edwards Marsh Bell levee district-------..                            ----- _                           _
                                                                                                        -__-..               6, 269  None         100. 0
    Gibbons levee district...---------------------------                                           13, 023                 14, 585   None         100. 0
    Hewitt levee district_- _-           - --------------                   __ _-                                    -_____  2, 717  None         100. 0
    Heath levee district-- _           - __        -          -
                                                            ___        - __ --                     23, 246                 40, 049   None         100. 0
    Isett-Blackburn levee district-_------ ----------                                _                9,804                20,169    None         100. 0
    Labette County levee district .--------------------------------                                                          2,103   None         100. 0
    Linden levee district.....  ----------------------------                                       16,225                  27,624    None         100. 0
    Lawrence levee district.-__---------______-                                            --         8, 682               24, 762   None         100.0
    Mathes levee district._                     _-- ._.____-.            ._
                                                                         __..                      10, 375                 10, 375   None         100. 0
    Nation levee district_.___                   --.             -----------         _             20,864                  23, 562   None         100. 0
    Nixon levee district-----------------------------                                                 4, 749                 9,698   None         100.0
    Rosenthal levee district__                         __10,574                                                             46, 284  None         100.0
    Sare levee district_------- -------......                      ___. .. ___                     26, 067                 26, 067   None         100. 0
    Sheltz levee district.. .__------------____                                        -__         37, 200                 45, 184   None         100. 0
    Wikle levee district_--- -----------                          _........         __             11, 994                 27, 659   None         100.0
St. Francis River:
    Craighead County, Ark., drainage district no. 12..--------------...........                                            30, 000   None         100. 0
    Craighead County, Ark., drainage district no. 17---.------------                                                       20, 843   None         100. 0
    Craighead County, Ark., drainage district no. 26--...                                     ........------------         60, 330   None         100. 0
    St. Francis drainage district, Clay and Greene
                                      --
       Counties, Ark_-----......_ ...---------...-.-                                               66, 601                596, 969   None         100. 0
    Dunklin County, Mo., levee district no. 4-......                            ------------     .             ..          12, 800   None         100. 0
    Dunklin County drainage district no. 25.........-----------                                      .....------------....91.906     None         100. 0
    Dunklin County drainage district no. 7----.......-------.....--------                                          --........7, 657  None         100. 0
    Mingo drainage district_--------__---...                              .          ...-. -__                   -       - 11, 890   None         100. 0
    Mississippi County drainage district no. 17.........                                           68,259              1, 018, 905   None         100. 0
    Mud Slough drainage district__--                      .
                                                     _----___-_                  ...        ......                         -.7, 682  None         100. 0
    Poinsett County drainage district no. 7-.............                                          42, 165                 42, 165  49, 835        45. 8
    V         -edor---------..-......
    l--------is-                                   -v-e-...                                        46, 604                 46, 604   None         100. 0
Verdigris River:
    Carlton W. Hall levee.--..-..-..-..                            ----.........-..           _4,                 .             379  None         100. 0
    Elias private levee               ---------...............------------                           5, 650                  5, 650  None         100.0
White River:
    Jackson County levee district no. 3--...---.                             -               -......-.....--..               6, 261  None         100. 0
    Gibson levee district--                 __ _ __                  .........-------------                 ..             12, 500   None         100. 0
    Jackson County levee district no. 2-----------.......-.                                                             -. 61, 110   None         100. 0
    Jacksonport levee district no. 2_                                                    ............--..--.-
                                                                                                 ____            _         44, 354   None         100. 0
    Padgett Island levee district_ ...-__------ ----                                    ...
                                                                                         _ _--_               .-.          43, 785   None         100. 0
    Village Creek-White River levee district..............----------...------------...                                     46, 349   None         100. 0
    White River levee district, Woodruff, Prairie, and
       Monroe Counties, Ark....----------------------------------                                                         145, 058   None         100. 0
    White River levee district, Woodruff, Prairie, and
       Monroe Counties, Ark _______---------------------------_                                           _ __...226,                   400
    Phillips County drainage district no. 1 of Phillips
       and Monroe Counties, Ark ..........-----...--.                                __-            --                     11, 912   None         100. 0
Ohio River: Shawneetown, Ill........................._......................                                                        32, 000         0

                  VICKSBURG ENGINEER DISTRICT
Red River (left bank):
   Bossier levee district, Louisiana-..................-............                                       115, 656              None             100. 0
   Ogden levee district, Arkansas            --...............................                              32, 369              None             100. 0
   Red River levee district no. 1, Arkansas-..........-............                                        264, 581              None             100. 0
   Red River levee district no. 2, Arkansas..........------------............                              161, 847              None             100. 0
   Hempstead County levee district no. 1, Arkansas _ _ .......                   ------------              136, 504              None             100. 0
   Orton levee district, Arkansas-__-__-_ __-..                                ..........                  250, 465              None             100. 0
   Saline levee and drainage district, Louisiana_ .....                          -----------..........     240, 881              None             100. 0
   Grand Bend levee repair ....---------------------------                                .                  9, 719              None             100. 0
Red River (right bank):
   Garland levee district, Arkansas___-     ..........-                             ___ ___ - -             284, 213             None             100. 0
   Miller levee district no. 2, Arkansas------....              ------          _____                        21, 733
                                                                                                           -___                  None             100.0
Arkansas River (left bank):
   Farelly Lake levee district, Arkansas-----------...........                                              1768,2559            None             100. 0
Tallahatchie River (left bank):
    Locopolis drainage district, Mississippi .      -_ ..... ..
    Matthews Bayou drainage district, Mississippi---....--.....------------
                                                                            ..   ------------
                                                                                        5, 764                                   None             100. 0
                                                                                        9, 538                                   None             100. 0
    Panola-Quitman drainage district, Mississippi- ..----....                      ------------
                                                                                       80, 007                                 s None             100. 0
    Patterson Bayou drainage district, Mississippi..                ..----------------- 7, 553                                   None             100. 0
    Private levee near Roane, Miss __________-___...         __________                 6, 899                                   None             100. 0
Tallahatchie River (right bank):
    Newsome Lake levee district, Mississippi----...        --.-.. ......               16, 617                                 5None              100. 0
     Private levee near Glendora, Miss--..-.............       ........      1, 036 -....
  aIncludes 32,253 cubic yards placed by local authorities.
  SIncludes 333,927 cubic yards placed under par. 2 of sec. 6, act of May 15, 1928.
  * Amount shown in 1933 Annual Report represented yardage necessary to raise levees of whole system to
new grade and section. Work under contract by United States completed.
                                       MISSISSIPPI RIVER COMMISSION                                                                      1737
TABLE   3.-Yardage placed during 12 months, from July 1, 1936, to June 30, 1937,
    in repairing levees on tributaries of the Mississippi River threatened or
    destroyed by flood, including the flood of 1927, as provided for in sec. 7 of the
    act of May 15, 1928-Continued

                                                                                Built since Total built Remaining                       Percent
                             Levee district                                     July 1, 1936 under sec. 7 to be built                  complete


Yazoo River (left bank):                                            Cubic yards Cubic yards                        Cubic yards
    Eden levee district. Mississippi..-----------------                      ...------------ 9, 845                     None                100. 0
    Belzoni levee district, Mississippi----------------                      ...------------ 2,949                      None                100. 0
    Rocky Bayou levee and drainage district......-----------    ____........                 10,168                     None                100.0
Yazoo River (right bank): Atchafalaya levee district,
  Mississippi ....                  ..-------------.---------------------------------        10,764                           None          100. 0
Coldwater River (left bank): Sledge Bayou drainage
  district, Mississippi __________....__..__
                                      ..                                ...------------...    9, 828                      6   7, 752      6 100. 0

                SECOND DISTRICT, NEW ORLEANS

Red River (right bank):
    Red River and Bayou des Glaises levee and drain-
     age district:
        Barbins Landing levee .__--..- -_                                      -_
                                                                 __---- _-______        ..             36, 428            None             100. 0
        Bayou Leaunoir levee ..                                     _
                                                          -----------     ..        ......             18, 996            None             100. 0
        Barbins Landing levee (lower) ---------------------------
                                                       .........                                       40, 091            None             100. 0
        Barbins Landing levee (upper)----...----..---------___________                                 41,730             None             100. 0
        Barbins levee .......----------------------------------------                                  24, 313            None             100. 0
                        ..
        Bettevy levee ________________________                               ___________               11,691             None             100. 0
        Brouillette levee .          ....------------------------               -----------            19, 380            None             100. 0
        Lower Brouillette levee                                                                        31,698
                                                                                   ....--------------------------------   None             100. 0
        Johnsons Cross Levee ----------------------------------                                         8, 924            None             100. 0
        Normans Landing levee-------------------- ------------                                         40,167             None             100. 0
        Johnson Bayou levee-------------                        ----------         46, 347             46, 347            None             100. 0
        New Barbin levee.....---------------------------                           27, 403             27, 403            None             100. 0
        Gardenier levee--------------_
                              _---------------                                     13, 098             13, 098            None             100. 0
        Lower Normand_           _--                                               17, 938             17,938             None             100. 0
Atchafalaya Basin:
    Cypremort Crevasse_         __.-.........                -..__...____. -.....                    342, 500             None             100. 0
    Port Barre-South levee___                                                 ___      _____           22,170             None             100. 0
        Total .. ------------------------------------                                863, 935      8, 668, 518

   * System 100 percent complete.                Yardage shown remaining to be built was lost during fiscal year by
flood.
Statement of the net expenditures by the U. S. Government, under supervision of the President, Mississippi River Commission (including all
     expenditures under sec. 7 of Flood Control Act approved May 15, 1928), for the construction and repair of levees; and expenditures for
     similar purposes by States, levee districts, and communities interested, from 1882 to December 31, 1936, covering cost of yardage placed,
     rights-of-way, interest, engineering expenses, repairwork, high-water expenses, crevasse closing, etc.

                                                                                                        Net expenditures by United                  Net expenditures by United
                                                                                                        States from Government funds                 funds   from    contxpended                             by
                                                                                                                                                                                                                                                0O
                                             Districts                                                                                                                                           State and local              Total
                                                                                                                                                                                                  organizations

                                                                                                          Old project          New project              Old project           New project


Northern (regular flood control)-----------             -------------------------......          $3, 067, 923.04           $19, 287. 55     $1, 156, 801. 30              $9, 643. 78                      (1)            $4, 253, 655. 67
Omaha (emergency flood control, sec. 7) _.....-...                                       _ ... _       ---._ _---------      1, 487. 50              .--------------------.......                          (2)                   1, 487. 50
Kansas City (emergency flood control, sec. 7) .____________              ___._____.____       --... _____             _     25, 000.00 ___________-_-_- _                         ....-------------        (2)                 25, 000. 00      H
Rock Island:
    Regular flood control _______________...._______._____                   ....                                  .       594, 069. 30 ---------
                                                                                                                          5294,                                    -              081. 60         3 4, 604, 514. 84         5, 492, 665. 74
    Emergency flood contrcl (sec. 7)------------------------------..---..-------
St. Louis:
                                                                                            ...----------------             61, 499. 55          ...     ..---------------- 2, 079. 22--63,                                         578. 77     O
                                  ...
    Regular flood control _________..._____     .
                                              ___... ..           ___________
                                                                           ..        ......                       .     1, 766, 274. 09----                           -883, 463. 89                 3 15, 129, 541.07      17, 779, 279. 05
    Emergency food
    Emergency   flood control  (sec. 7)------------------------------------------------25,
                      control (sec.   7)_.._... ..... . .         ...    ......                      .        ...           25, 119. 47 . ----------------------------------------
                                                                                                                                119. 47       ......      ...          ..........               . ..... ...         ...         25,119.
                                                                                                                                                                                                                                25,      47
                                                                                                                                                                                                                                    119. 47     M




Memphis:                                                                                                                                                                                                                                        z^
    Regular flood control .___.         ........
                                  _______________________       ...           .    21, 898, 591. 58   34, 951, 830. 51     4, 592, 925. 15  61, 893. 56      3 61, 377, 459. 18                                           122, 882, 699.   98
   National Industrial Recovery Act flood control __________     _________                          _ 11, 521, 173. 76 _5,                      767. 46 ------------                                                       11, 526, 941.   22
    Emergency Relief Administration flood control_ ......  _____           -
                                                                       _____.--          .. -__.
                                                                                  __ _____-..             203, 532. 56      _--------------------.------------------.                                                          203, 532.   56   02
   Emergency flood contrcl (sec. 7)___________________________-------------      --------------- 2, 459, 135. 78                 _167.               04---         --                                                       2, 459. 302.   82
Vicksburg:
    Regular flood control___...________________----------________                  30, 257, 665. 36   38, 363, 523. 80     6, 054, 329. 85 41, 090. 35       3 44, 601,986. 94                                            119, 318, 596. 30
   National Industrial Recovery Act flood control _-__     -_____        __ ___---------    -----      2, 293, 413.000                                                                                                      2, 293, 413.00
     Emergency Relief Administration flood control_-_ ---------                                           -    ---                 121,454. 30-         -------------------                                                 -121, 454. 30
    Emergency flood control (sec. 7) .            -            ----------------------------                                        999,002.999,
                                                                                                                                        002. 69 _                  -620.                 52    ------------       -----       999, 623. 21
Second New Orleans:
    Regular flood control..___________________________                          __.                26, 633, 403. 70            43, 142, 641. 78          4, 373, 938. 37         17, 353. 73     3101, 583, 268. 70       175, 750, 606. 28
    National Industrial Recovery Act flood control ... .. __.____                          ..  __ ____......      ..            7, 686, 547. 36    .-                                                                       7, 686, 547. 36
    Emergency flood control (sec. 7)       -------------------------------------------------
                                                                                      ___     ____                                           81
                                                                                                                                        987. 81
                                                                                                                                   532, 98                                                                                     532, 987. 81
        Total-------------       _-                         --       ---            --. -       ...--
                                                                                                   --    81, 857, 583. 68     144, 767, 980. 81         16, 177, 994. 67      1,316, 161. 15      227, 296, 770. 73       471, 416, 491.04

     1 Included in amounts reported by the Rock Island and St. Louis districts.
     2 Reports not obtained from United States engineer districts.
     3 Not segregated under "Regular flood control," "Emergency flood control," etc.
                                       MISSISSIPPI RIVER COMMISSION                                                                   1739

   The total United States and contributed funds expended under
supervision of the president, Mississippi River Commission, for all
purposes, including expenditures for revetments, contraction works,
levees, dredging, surveys, etc., from June 28, 1879, to June 30, 1937,
amounts to $496,983,951.70 of which $4,366,361.88 was expended from
United States and contributed funds for emergency flood control on
tributaries of the Mississippi River (sec. 7, Flood Control Act ap-
proved May 15, 1928) and $1,005,723.95 from permanent indefinite
appropriations. Of the total expended to June 30, 1937, under sec-
tion 7 of Flood Control Act approved May 15, 1928, $4,364,161.88 was
expended for levees and $2,200 for removing an ice gorge in the
vicinity of Bismarck, N. Dak.
   The following is a table (supplementary to foregoing table) show-
ing net total expenditures for levees to June 30, 1937 (with excep-
tion of amounts expended by State and local organizations which
are not of record beyond Dec. 31, 1936) :

                                                  Net   expenditures   by                      Net expenditures by
                                                   United States from Gov-                      United States from
                                                   ernment funds                                contributed funds
                  District                                                                                                          Total

                                                  Old project           New project            Old project New project

Northern (regular flood control) - --             $3, 067,923.04              $19, 287. 55 $1, 156, 801.30           $9, 643. 78 $4, 253.655. 67
Omaha (emergency flood control
 (sec. 7)) .................... __                _-------------                1,487.50 .........................                    1, 487. 50
Kansas City (emergency flood con-
                ...............--....-------
  trol (sec. 7))---------                         -------.
                                                 .-     . . . . . .-           25, 000. 0(                                           25, 000. 00
Rock Island:
    Regular flood control...........                        594, 069. 3(                    S294, 081.6C        888, I50.. 90
    Emergency flood control (sec. 7).                        61,673. 25         --- -.-
                                                                               ----               2, 079.21      63, 752 47
St. Louis:
    Regular flood control_..-.-----.                     1, 776,069.81 |-.-....-..         - 888, 361. 69 2, 664, 431. 50
    Emergency flood control (sec. 7).                        29,787.92         -            -........... 29, 787.92'
Memphis:
    Regular flood control---..........  21,898, 591. 58 37, 640,313.15 4, 592,925.15            61, 893. 56 64, 193, 723. 44
    National Industrial Recovery
      Administration flood control _                    11, 521,173.76 ............. 5, 767. 46 11, 526, 941.22
    Emergency Relief Administra-
      tion flood control____                       ----- 217,680.21 .-...--.---                                 217, 680. 21
    Emergency flood control (sec. 7)_ .-----------       2, 675,387.86.-----------                   167. 04 2, 675, 554. 90
Vicksburg:
    Regular flood control---.......... 30, 257, 665. 36 39, 271,842. 051 6,054, 329.85         51,827. 84 75, 635, 665. 10
    National Industrial Recovery
      Administration flood control.                      2, 293,413.00                                       2, 293, 413.00
    Emergency Relief Administra- .............
     tion flood control__.........     ..-...........-      121,454. 30                                         121,454.30
    Emergency flood control (sec. 7)_                    1,023,  800. 56          -..........
                                                                                       ...      .620.     52 1, 024, 421. 08
Second New Orleans:
    Regular flood control........... 26, 633, 403. 70146, 233, 569. 2314, 373, 938. 37         17, 353. 731 77, 258, 265. 03
    National Industrial Recovery
     Administration flood control-.                      7, 985,456.  00 .........................           7, 985, 456. 00
    Emergency flood control (sec. 7)._                      544, 158. 01 1---.              ---           -     544, 158. 01
                                                                   1-     -         -      l                                -   I
                                                                                                                                t


       Total __....-..............--             81. 857, 583. 681152,035, 623. 46 16, 177, 994. 67 1, 331, 796. 44 251,402, 998. 25



                                               FLOODWAYS           AND           SPILLWAY

   Birds Point-New Madrid floodway.-All work in connection with
the construction of the drainage ditches and appurtenant structures
necessary to carry the drainage intercepted by the Birds Point-New
Madrid floodway set-back levee has been completed and the system
has been functioning very satisfactorily for 51/2 years. The con-
struction of the set-back levee is complete except for a short gap
at the Missouri Pacific Railroad crossing at Samos, Mo. This gap
was filled with sand bags during the Januaray-February 1937 flood.
1740    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Possession of necessary right-of-way has been secured, and it is
expected to effect permanent closure this working season. Fee sim-
ple title has been secured to all lands for one-half mile landward
  rom the upper fuse plug section of the river-front levee and per-
petual flowage easements have been secured over 81 percent of the
remainder of the floodway, making the acquisition of flowage rights
complete on 81.6 per cent of the lands within the floodway. The
fuse plug sections of the river-front levee have not been de-graded
to the project grade.
   The 1937 flood overtopped, crevassed, and scoured the river-front
levee in many places and inundated the entire floodway, which, at
the crest stage, was handling approximately one-fourth of the en-
tire flood flow of the river. The flow of water into the floodway
developed three crevasse groups in the 11-mile upper fuse-plug
section, four between river miles 18 and 30, and one near river
mile 49. Out-flow developed one large crevasse and many smaller
crevasses and scours between river miles 40 and 47 and numerous
crevasses in the lower fuse-plug section. All of the openings except
near river mile 49 and in the lower fuse-plug section were closed, by
interim levees under repair contracts, or by emergency work of
sufficient magnitude to prevent headwater flooding from the rise
of May 1937. The break near river mile 49 admitted some head-
water to the extreme south part of the floodway and increased the
stage of backwater slightly. Contracts have been let to replace
the levee to previous grade and section at all crevasses and scours
above the lower fuse-plug section, with the exception of two loca-
tions where advertising has been deferred because of wet borrow
pits. Much of the repair work has been done, and it is expected
that all will be completed during the present working season.
   Boeuf floodway.-Surveys for the location of the protection levees
have been made. Dring fiscal year 1931 comprehensive revision
studies for Boeuf overflow basin and estimates on a number of alter-
nate plans were prepared. During the fiscal year 1932 surveys and
studies were made to determine the feasibility of diverting excess
Mississippi River waters through a ditch located in the thalweg of
the Boeuf Basin the original pilot ditch to be enlarged by erosion.
During the fiscal year 1933 diversion studies were continued. Plans
and estimates for the protection of West Monroe, La., were com-
pleted. The construction of protection levees for the south portion
of West Monroe has been completed. Plans and estimates for the
protection works on east bank of Ouachita River at Monroe, La., and
vicinity, begun during the fiscal year 1933, were completed during
the fiscal year 1934. The construction of the protection works on
the east bank of Ouachita River from above Sterlington to below
Monroe was approximately 85 percent completed during the fiscal
year 1935. Protection levees and levee walls for Monroe and West
Monroe, La., have been included in Ouachita River levee system since
plans for the Boeuf floodway have been abandoned under authority
of act approved June 15, 1936.
    Eudora floodway.-During the fiscal year 1933, preliminary as-
sessment surveys were made between proposed floodway limits in
Arkansas and Louisiana. During fiscal years 1933, 1934, and 1935,
revision studies, plans, and estimates were continued on which the
                       MISSISSIPPI RIVER COMMISSION                                1741

project adopted by act approved June 15, 1936, was based. During
the fiscal year 1937, detailed plans and estimates were continued.
Aerial photographic surveys have been completed of the area in
Arkansas and Louisiana, right-of-way and ownership surveys were
made of the area, preparation of tract maps, appraisals by the
Department of Agriculture and Forestry Service and taking of
options was begun of the area in Arkansas and Louisiana. Third
order control, topographic, drainage and levee location surveys have
been completed.
   During the 12 months ending June 30, 1937, costs amounting to
$463,113.40 and net expenditures amounting to $417,652.93 were in-
curred by the Vicksburg district under regular funds. Prior to this
fiscal year no costs nor expenditures had been incurred for this work.
   Yazoo Basin.-During the 12 months ending June 30, 1937, costs
amounting to $99,394.90 and net expenditures amounting to
$97,926.48 were incurred for Yazoo Basin (Sardis Reservoir) from
regular funds (allotment to the Vicksburg district of $100,000 made
on August 1, 1936 from appropriation for flood control, Mississippi
River and tributaries) under supervision of the Mississippi River
Commission. The above costs and expenditures are exclusive of
costs and expenditures incurred by the Vicksburg district during the
12 months ending June 30, 1937, from Lower Mississippi Valley divi-
sion funds, as follows:
Regular funds:
   Cost-------------                     ------------------------------     $122, 702. 52
   Net expenditures--------                       -------------------------  160,930.16
Emergency Relief Act funds:
   Cost-----------------------------------------------                       660, 725.80
   Net expenditures------------------------------------- 641,114.90
The Advisory Committee on Allotments, at its meeting held on
August 27, 1935, adopted an informal resolution recommending the
inclusion of the Sardis Reservoir in the relief program with an
initial allotment of $1,000,000. Under supervision of the Lower
Mississippi Valley division, the original allotment of $1,000,000 was
made on September 24, 1935, from appropriation for "Emergency
Relief, War, Rivers and Harbors, Flood Control, etc., 1935-1937"
 (later revocations reduced this allotment to $750,000); and the sum
of $2,500,000 was allotted on May 20, 1936, from appropriation for
maintenance and improvement of existing river and harbor works
(later revocations reduced this allotment to $2,461,000). Although
the project became under supervision of the Mississippi River Com-
mission prior to fiscal year 1937, as provided for in section 4 of
Flood Control Act approved June 15, 1936, the allotments above
mentioned aggregating $3,211,000 were not available for use of the
Mississippi River Commission and costs incurred thereunder are not
reported in the Annual Report of the Mississippi River Commission
for this fiscal year. No costs nor expenditures were incurred for
this project from either Mississippi River Commission funds nor
Lower Mississippi Valley division funds prior to fiscal year 1937, al-
though division funds were available prior to that fiscal year. The
existing project for Sardis Dam and Reservoir was authorized by
the Flood Control Act approved June 15, 1936, which is based on
report published in House Document 198, Seventy-third Congress,
second session, and report published in House Committee Document
1742    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

No. 1, Seventy-fourth Congress, first session. Work accomplished
during fiscal years 1936 and 1937 is reported by the district engineer,
Vicksburg, Miss. (river and harbor works).
   Morganza floodway.-Property surveys and mapping have been
completed except for minor changes required from time to time
as a result of changes in ownership. Preliminary surveys and
studies have been made with the idea of utilizing the crowns of
guide levees for roads in locations otherwise inaccessible. Options
for fee-simple purchase have been obtained and recorded covering
approximately 54.2 percent of the value of the lands in the floodway.
Options for purchase of flowage easements have been obtained cov-
ering approximately 26.6 percent of the value of the lands in the
floodway.
   During the 12 months ending June 30, 1937, .costs amounting to
$52,877.59 and net expenditures amounting to $52,222.09 were in-
curred by the second district, New Orleans, under regular funds.
Prior to this fiscal year no costs nor expenditures had been incurred
for this work.
   West Atchafalaya floodway.-Property surveys and mapping have
been completed except for minor changes required from time to
time as a result of changes in ownership. Preliminary surveys
and studies have been made with the idea of utilizing the crowns
of the guide levees for roads in locations otherwise inaccessible.
Options for fee-simple purchase have been obtained and recorded
covering approximately 16.3 percent of the value of the lands in
the floodway. Qptions for purchase of flowage easements have been
obtained covering approximately 10.4 percent of the value of the
lands in the floodway.
   During the 12 months ending June 30, 1937, costs amounting to
$61,148.09 and net expenditures amounting to $59,919.88 were in-
curred by the second district, New Orleans, under regular funds.
Prior to this fiscal year no costs nor expenditures had been in-
curred for this work.
   Outlet west of Berwick.-Property surveys and mapping have been
completed except for minor changes required from time to time as
a result of changes in ownership. Preliminary surveys and studies
have been made with the idea of utilizing the crowns of the guide
levees for roads in locations otherwise inaccessible. Options have
been obtained covering a dredging easement over 1.3 percent of
the acreage in Wax Lake outlet. Agreements as to price have been
reached on 26 percent of the acreage but options have not been
received to date due to mortgage and other delays; the United
States Attorney General has been requested to institute condemna-
tion proceedings for the acquisition of the remaining lands in the
Wax Lake outlet.
   During the 12. months ending June 30, 1937, costs amounting to
$69,806.12 and net expenditures amounting to $67,872.54 were in-
curred by the second district, New Orleans, under regular funds.
Prior to this fiscal year no costs nor expenditures had been incurred
for this work.
   Atchafalaya Basin.-During the fiscal year 1937 levee construc-
tion in the Atchafalaya Basin protection levee system was prose-
                    MISSISSIPPI RIVER COMMISSION               1743
cuted at a vigorous rate. The west levee line now furnishes com-
plete protection from Hamburg, La., to Charenton, La., with the
exception of short sections of second lift levee now under con-
struction, which should be completed by December 1937. Interim
protection is furnished from a few miles below Charenton to the
Verdunville Canal near Patterson, La. The east levee line fur-
nishes complete protection from Viva, La., to Morgan City, La.,
with the exception of short sections of second lift levee now under
construction, which should be completed by December 1937. In-
terim protection has been provided between Viva, La., and Mor-
ganza, La., connecting the East Atchafalaya Basin protection levee
to the main Mississippi River levees. Considerable difficulty is
being experienced, particularly in the southern portion of the basin,
in bringing levees to full grade and section due to numerous slides
and foundation failures.
    Channel improvement dredging to increase the flood discharge
capacity of the basin was continued throughout the year. The
Whiskey Bay Channel enlargement and Chicot Pass Channel en-
largement have been completed, while Blind Tensas cut is about
50 percent complete. These jobs are part of a project to develop
a main channel for the Atchafalaya River above Grand Lake.
    During the 12 months ending June 30, 1937, costs amounting to
$27,800.93 and net expenditures amounting to $27,492.43 were in-
curred for enlargement and alteration of railway bridges (Atcha-
falaya River improvement) by the second New Orleans district
under regular funds. Prior to this fiscal year no costs nor expendi-
tures had been incurred for this work.
    Bonnet Carre spillway.-The construction of the Bonnet Carre
spillway structure was brought to completion on February 10, 1931.
Both the upper and the lower guide levees were completed to
final grade in the summer of 1932, excepting gaps at highway and
railroad crossings. During the fiscal year 1935, two of the four
crossings were completed, including bridges and approaches. Dur-
ing the fiscal year 1936 the other two crossings were completed,
including bridges and approaches. Closure of all gaps in the guide
levees at the highway and railroad crossings was completed during
the fiscal year 1936. Degrading of the Mississippi River levee
across the entrance to the approach channel of the spillway was also
completed during the fiscal year 1936, excepting the dressing and
sodding, which was completed in December 1936. The drainage
canal above the upper guide levee was completed on October 15,
1936. These two latter items of work brought the construction of
the spillway and floodway to completion.
    The Bonnet Carre spillway was first placed in operation during
the 1937 flood season. Gradual opening of the spillway bays was
begun on January 28, 1937, and was continued until February 18,
at which time 285 of the 350 bays were in operation. A maximum
flow of approximately 211,000 cubic feet per second was recorded
on February 25 with 285 bays in operation. Maximum discharge,
with all bays in operation, as contemplated in the act of May 15,
1928, is 250,000 cubic feet per second. Gradual closing extended
from March 7 to 16, inclusive.
     20196-37--pt. 1--110
1744     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   The rate of opening the bays was planned so as to prevent the
Carrollton gage exceeding 20 feet. The closing schedule attempted
to diminish the daily weir discharge by an amount approximately
equal to the decrease in river flow, and thus hold the Carrollton
gage stationary.
   In order to assure a 2-foot freeboard on the guide levees above a
computed flow line of 250,000 cubic feet per second at points where
settlement had occurred, they were raised from 1 to 4 feet at various
points by means of timber cribs and wall filled or backed with sand-
bags. Deflection dikes were built to direct the current away from the
guide levees. Material for topping and other construction was un-
loaded directly from the Illinois Central Railroad on the guide
levees. A motorboat was operated continuously above the weir fore-
bay as a "drift patrol", whose function was to prevent drift being
drawn against the weir and remove debris which accumulated
against the structure. One hundred and fifty-three gages were
established in the river forebay, floodway proper and Lake Pon-
chartrain. Continuous patrols were maintained for purposes of
reading gages and observing and reporting on conditions of guide
levees, current, and drift. Observation of velocity, path of flow, and
discharge were taken continuously during operation, while scour and
silting studies were made throughout the floodway following the
weir closure. While considerable localized scour and general silt-
ing was noted, no damage occurred to the structure.
   During the operation period communication between the area
office and spillway control points was maintained by telephone;
while radio was used between spillway control point and patrol and
construction parties. Over 1,000 men were directly employed on the
spillway in operation, construction, patrol, and observation during
the flood period.
    The spillway structure consists of a weir divided into separate
needle-control openings by piers spaced 22 feet on centers, a rear
concrete apron protected by riprap, a concrete fore apron with
dentiled baffles, and an articulated concrete slab talus 6 inches in
thickness resting upon layers of riprap and gravel. The principal
data of the spillway and floodway are as follows:
   Location, 32.8 miles above Canal Street, New Orleans, and 942.4 miles below
Cairo, Ill.
   High-water elevation, 24.3 feet above mean Gulf level corresponding to eleva-
tion 20 feet Carrollton gage.
   Project discharge, 250,000 cubic feet per second.
   Length of spillway between abutments, 7,698 feet.
   Clear opening, 350 wiers, at 20 feet, 7,000 feet.
   Spillway structure completed February 10, 1931.
   Width of floodway between center lines of levees at lake, 12,000 feet.
   Length of floodway, 5.7 miles.
   Area of floodway, 7,860 acres.
   Maximum height of levees, 19.3 feet.
   Total length of side levees, 11.8 miles.
   Floodway completed December 1936.
   Spillway and floodway cost to date $7,314,550.05."
   Rights-of-way, flowage, and damage cost to date $6,223,963.30.

  12Does not include maintenance.
                                      MISSISSIPPI RIVER COMMISSION                                                                     1745
   The following table gives in detail the status of the work on the
floodway at the end of the fiscal year:

                                                                                                Estimated                            Percent
                                          Section                                               total under        Total in         completed
                                                                                                 contract           place             to date


                                                                                                 Cubic yards Cubic yards
Lower highland-........----------------...............--------------------------.....                 560, 000           516, 506          100. 0
Upper highland-----              --            ......             .....                               400, 000
                                                                               ...------------------------------------.. 376, 796          100. 0
Lower swamp:
   Hydraulic fill ---------------------------------------                                        1 2, 300, 000 2 3, 479, 574               100. 0
   Superimposed fill                 --------------------------------------                         1 250, 000           375, 000          100. 0
   Cut-off ditches----......------------------------------------                                   1360,    000       3 547, 079           100. 0
Upper swamp:
   Hydraulic fill.................................----------------------------------------         3, 000, 000 44, 522, 174                100. 0
   Superimposed fill            -------------------------------------                              1 310, 000            453, 000          100. 0
   Cut-off ditches--            --------------------------------------                              1 470,000          a 716, 468          100. 0
Degrading Mississippi levee across entrance channel.....---------.......                              270, 000         6 306, 586          100. O0
Drainage canal above upper guide levee- ------------------------- 169,000                                                169,190           100.0

  1 50 percent excess permissible.
  2 Includes 29,574 cubic yards placed by Government plant in closing Illinois Central R. R. gap in lower
guide levee and refilling landside borrow pits.
  3 Includes 7,079 cubic yards placed in cross dikes.
  4 Includes 72,340 cubic yards placed by Government plant in closure of Illinois Central R. R. and Lake-
shore-Hammond Highway gap and extension of upper guide levee and 6,138 cubic yards placed by con-
tractor inclosure of Louisiana & Arkansas Ry. gaps in both guide levees.
  1 Includes 11,468 cubic yards placed in cross dikes.
  6 Includes 34,374 cubic yards placed in closure of Jefferson Highway gaps in both guide levees.


  The costs and net expenditures for the Bonnet Carre spillway
during the 12-month period ending June 30, 1937, incurred in the
second New Orleans district, were as follows:

                                                                                                                        Regular funds

                                                 Allotment
                                                                                                                     Costs          Net expend-
                                                                                                                                      itures

Construction, Bonnet Carre----                                ..---------------------------------..
                                                                                          $56, 385.60                                $56, 930. 08
Maintenance, Bonnet Carre spillway.......----------------------------------110,949.33                                                108,807.52
        Total---------------------              ----------------------------------------------                    167,334.93         165,737.60


  The net expenditures on the Bonnet Carre spillway to June 30,
1937 (all new project), amounted to $13,647,320.87, of which $13,512,-
320.87 was expended from regular funds and $135,000 from National
Industrial Recovery Administration funds.
                                       WATERWAYS                 EXPERIMENT STATION

  The Waterways Experiment Station operating under the direction
of the President, Mississippi River Commission, comprises an hy-
draulic laboratory and a soil mechanics laboratory. The studies at
this station arise from problems encountered by the engineer depart-
ment in regulating and improving the rivers and harbors of the
country. The primary purpose of all studies is to aid in obtaining
the most economical and efficient engineering design for proposed
works. The station is concerned primarily with problems relative
to the lower Mississippi River and its tributaries; however, under
1746    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

authority from the Chief of Engineers the station also undertakes:
studies for districts outside the lower Mississippi Valley division.
During the past fiscal year, the hydraulic laboratory has performed
studies on 10 problems pertaining to the lower Mississippi Valley
division and 13 problems pertaining to districts outside this division.
The latter involved nine different engineer districts. In addition, one
experiment was undertaken in the hydraulic laboratory for a non-
Government agency. The soil mechanics laboratory conducted five
studies pertaining to the lower Mississippi Valley division and seven
for districts outside that division. The soil laboratory also con-
ducted three studies for other governmental agencies. All experi-
ments performed have a practical application to the work of the
Corps of Engineers, United States Army, in its administration of
the rivers and harbors of the Nation. The Waterways Experiment
Station holds as an unvarying principle the maintenance of close
contact with the field in all experimental work. This contact is kept
both by station personnel visiting the prototype, and by engineers
from the field visiting the station while pertinent model studies are
in progress. The following table summarizes all experiments com-
pleted or in progress at the Waterways Experiment Station from
July 1, 1936, to June 30, 1937 :
                         Experiments completed or in progress at the Waterways Experiment Station July 1, 1936, to June 30, 1937


        Name given to experiments                Scale of model:
                                                    zontal,       =hori-
                                                            d=vertical            Purpose of the experiment or scope of model            Performed for (Mississippi
                                                                                                                                           Commission   and outsideRiver
                                                                                                                                                                     dis-          Percent completed
                                                                                                                                          tricts)

Study of existing cut-offs and Atchafalaya       1=1:2000, d=1:100........    To study the effects on the 1927 confined flood wave Mississippi River Commission...-- First series, 100; sec-
  River improvements (Helena-Donald-                                            of the flood-control plans after assumed develop-                                                    ond series,      100;
  sonville model).                                                              ments of the cut-offs and Atchafalaya River im-                                                      third series, 15.
                                                                                provements.
Study of Mississippi River channel capac- 1=1:2000, d=1:100 .......           To determine effects of cut-offs and corrective .. ..do ._.... ....               _ . . .......      100.
  ity in the vicinity of Arkansas City,                                         dredging on the discharge capacity of the leveed
  Ark. (Helena-Donaldsonville model).                                           channel in the vicinity of Arkansas City, Ark.
Study of the White River Emergency l=1:2000, d=l:100........ To determine the effects upon the crest of the 1927 ..---do..-----.......-.........---                                45.                       0/2
                                                                                                                                                                                                              H



  Reservoir (Helena-Donaldsonville                                              confined flood of various schedules of admitting                                                                             12
  model).                                                                       water into the proposed White River Reservoir.                                                                               02
Study of proposed cut-offs, Mississippi l= 1:2000, d= 1:100 ...____ To determine the effects of proposed cut-offs on - - do .. .. . . .                              ... ....... . First series, 100; sec-   0/2
  River (Helena-Donaldsonville model).                                          stage heights and time of travel of the 1927 con-                                                    ond series, 100.
                                                                                fined flood wave.
Memphis Depot, Mississippi River ...... 1= 1:450; d 1:150. .....  __          To determine improvements needed to maintain District engineer, Memphis, Tenn_ 100.
                                                                                a project channel to Memphis Engineer Depot.
Study of pipe-line mixers_.__-_ -- ___-__ l=1:8; d=1:8.......                 To determine effects of rifles in increasing percent- ----. do.......----------------                100.
                                                                                age of solids discharged by dredge pipe lines.
Racetrack Towhead, Mississippi River... 1= 1:1000, d=1:200....... To test ability of model to reproduce prototype Mississippi River Commission.... 100.                                                      02

                                                                                conditions during a period of dike construction
                                                                                in the vicinity of Racetrack Towhead, Missis-                                                                                Q


                                                                                sippi River.
Conchas Dam stilling basin, Conchas
  Dam, N. Mex.
                                                 1
                                            =1 :50, d =1 :5 0_.... . . . .. . To determine economical stilling basin for over- District engineer, Conchas Dam, 100.
                                                                                flow spillway.                                           N. Mex.                                                             Q
Maracaibo Outer Bar, Venezuela, South 1=1:300, d=1:50.______..                To study outer bar action at entrance to Lake Standard Shipping Co., New 85.
  America.                                                                       Maracaibo, Venezuela.                                   York, N. Y.                                                         I,1/1
Ballona Creek, Los Angeles, Calif ........ 1=1:100, d=1:50 ......             To determine best form cf structures to maintain District engineer, Los Angeles, 100.
                                                                                creek channel at outlet into Santa Monica Bay.           Calif.
                                                                                                                                                                                                             0
                                                                                                                                                                                                             TR




Kansas City flood control, Missouri River_ 1=1:800, d=1:100 ...... __ Study of proposed plans for the protection of the Division engineer, Missouri River 100.
                                                                                 Kansas Citys from floods of the Missouri and
                                                                                 Kansas Rivers.
                                                                                                                                         division, Kansas City, Mo.                                           H
Mare Island Strait, San Francisco, Calif._ 1=1:800, d=1:80_ .......           To determine means of eliminating shoaling in District engineer, San Francisco, 100.
                                                                                 navigation channel.                                     Calif.
Pryors Island Reach, Ohio River ......     1=1:600, d=1:150 ._....__          Study for improvement of navigation and channel District engineer, Louisville, Ky_. 85.
                                                                                 stabilization.
Chain of Rocks, Mississippi River........ 1=1:600, d=1:125_......-            To develop a system of regulating works to im- District engineer, St. Louis, Mo... 70.
                                                                                 prove navigation conditions.
Dogtooth Bend, Mississippi River ......    1=1:600, d=1:100 ._...  _          To determine methods of improving navigation .....            do .........____._. .. 70.
                                                                                 conditions.
Swift Sure Towhead, Mississippi River__ 1=1:600, d=1:120 ....... .....----         do _........................-.....-...              .....do_.                    __             70.
Grand Tower, Mississippi River ......      1=1:600, d= 1:150.._.. __          .....do __---_                              -             _-do _-- - --- - - - - - _ - 80.
Possum Kingdom Dam stilling basin, 1=1:70, d=1:70_ . .___-_ To determine an economical design of spillway District engineer, Mineral Wells, 100.
  Mineral Wells, Tex.                                                            and stilling basin.                                     Tex.
East River, New York, N. Y__ _._......     1=1:480, d=1:80-....__.. To study tidal currents in the East River .. _...                 District engineer, First New York 75.
                                                                                                                                         District, New York, N. Y.
                Experiments completed or in progres               at the Waterways Experiment Station July 1, 1936, to June 30, 1937-Continued

                                             Scale of model: 1=hori-                                                                   Performed for (Mississippi River
       Name given to experiments                zontal, d=vertical               Purpose of the experiment or scope of model             Commission and outside dis-           Percent completed
                                                                                                                                         tricts)
           -i                                                             I                                                        I                                       I


Lock and dam no. 6, Mississippi River ...    1=1:200, d=1:50-........         To study the backwater and silting effects from          District engineer, St. Paul, Minn_ First series, 100; sec-
                                                                               the operation of lock and dam no. 6, Mississippi                                             ond series, 100.             O
                                                                               River.
Sardis Dam spillway, Sardis, Miss__....      1=1:36, d=1:36.-.......          To study the hydraulic performance of the pro-           District engineer, Vicksburg, Miss. 15.                            3
                                                                               posed structure.
Sardis Dam outlet structure, Sardis, Miss_   1=1:25, d=1:25- .....            To study the hydraulic performance and safety               do- .......                          45.                            -...
                                                                               of the proposed structure.
Manchester Islands, Ohio River __.......     1=1:300, d=1:80- ......          To study plans for improving the navigation chan-        District engineer, Cincinnati,          45.
                                                                               nel of the Ohio River at Manchester Islands.             Ohio.
Study of tests on clay blanket across East   1=1:480, d=1:80 .......
                                                                 -            To determine the effects of a clay blanket in East       District engineer, First New York       100.
River at Belmont Island.                                                      River at Belmont Island on current directions            District, New York, N. Y.
                                                                               and velocities.
                                                                                                                                                                                                         O
                                                                       SOILS AND SEDIMENT INVESTIGATIONS
                                                                                                                                                                                                         M
Investigation of soil in Murray Dam,         Soils test_ _.______...    Investigation and testing of soil to determine Works Progress Administration,                          100.
  Ardmore, Okla.                                                          cause and means of repairing slide of reservoir      State of Oklahoma, Oklahoma
                                                                          slope.                                               City, Okla.
Testing of soil and rock for Conchas Dam_ . ...   do ---. - - -         Classification, chemical and physical tests of bor- District engineer, Conchas Dam,                    100.
                                                                          row pit and foundation material for preliminary      N. Mex.
                                                                          studies of project.
Experiments and investigations    to  deter- -... do  ............ .... To   determine relative quantities of seepage_._----_ District engineer, Memphis, Tenn_                Original tests, 100;
  mine the efficacy of sublevecs and                                                                                                                                            first series addi-
  berms in the control of seepage.                                                                                                                                              tional tests, 100.
Investigation to determine efficacy of ...do ...... . ..- To determine efficacy of asphalt revetment, __. do.-.....                     - - ..........   ._ _                  10.                       CI
  asphalt revetment, asphalt cut-off wall                                 asphalt cut-off wall and bentonite grout for con-
  and bentonite grout for controlling                                     trolling through and under seepage of levees.
  through and under seepage of leevees.
Test of foundation materials, Possum -- .do              - - - ..-.. To determine certain physical properties and District engineer, Mineral Wells,
                                                         .--                                                                                                                   100.
  Kingdom Dam, Mineral Wells, Tex.                                        characteristics of the foundation materials.         Tex.
Soils survey, Yerba Buena Shoal, San - . do - - . . . . . . To investigate the foundation of a part of the new District engineer, San Francisco,                               100.
  Francisco, Calif.                                                       fill for Yerba Buena Island.                         Calif.
Investigation of lateral pressure exerted         do._-
                                                   do-
                                                    .                   To determine the lateral pressure developed on California Debris Commission,                           70.                       -1
  against impounding dams by mining                                       dams by debris from surface mining operation.        San Francisco, Calif. (South                                              Ca
  debris.                                                                                                                      Pacific division).
Sediment survey of Mayersville Range, Sediment analysis .... __ To obtain field data and analyze same, on the Mississippi River Commission....                                 First series, 100; sec-
  Mississippi River.                                                      relative  amount of material moving   in suspension                                                    ond series, 15.
                                                                          at high and low stages of the Mississippi River.
Soils tests for Lake Traverse dike .. _-__-.  Soils test............... To determine the suitability of borrow pit material District engineer, St. Paul, Minn-.                100.
                                                                          for dike construction and to develop a tentative
                                                                          design for structure.
Analysis of sediment and sand samples, ....    do. .---------        ...---To analyze sand and water samples of Calcasieu        District engineer, First New Or- 100.
  Calcasieu Pass, La.                                                        Pass, La.                                             leans District, New Orleans, La.
Soils test, proposed ship channel, Lake .....  do.....__ To analyze sand and water samples of the proposed                           do .. . . . . . . . ..
                                                                                                                                 .....                            .. 100.
  Charles, La.                                                               ship channel.
Soils test, lock and dam no. 2, Mississippi .. do-..................       Investigation of soils to aid in the design of the    District engineer, St. Paul, Minn__ 35.
  River.                                                                     second lock.
Reproduction of soil erosion_...---.-------                                To furnish the cast and property for filming a pic-   Resettlement     Administration,    100.
                                                                             ture of soil erosion.                                Washington, D. C.
Sediment investigation, Mississippi River Soils test- ............         To ascertain the parts (per million) of sediment      Mississippi River Commission -..    100.
low water of 1936.                                                          in samples taken from the Mississippi, Old, and
                                                                             Atchafalaya Rivers.
Soils tests, Mississippi National Park .....   do.........           ..    To analyze samples of soil taken from the sites of    Vicksburg National Park Service, I 50.
service dams.                                                               proposed dams in three State parks in Missis-        Vicksburg, Miss.                I
                                                                             sippi.
                                                                                                                                                                            H




                                                                                                                                                                            U1




                                                                                                                                                                            Cd


                                                                                                                                                                            0



                                                                                                                                                                            C)
                                                                                                                                                                            H




                                                                                                                                                                            02
                                                                                                                                                                            z
                                                                                                                                                                            0
                                                                                                                                                                            0
1750      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Reports published to date include Sediment Investigations on the
Mississippi River and Its Tributaries Prior to 1930 (out of print);
Experiment to Determine the Limit of Backwater Influence in the
Illinois River (out of print); Hydraulic Studies of Proposed Dam
No. 37, Ohio River (out of print); Experiments to Determine the
Erosive Effects of Floodwaters on Railroad Embankments; Effects of
the Several Proposed Levee Extensions, South of Eagle Lake, Missis-
sippi (out of print); Sediment Investigations on the Mississippi
River and Its Tributaries, 1930-1931 (out of print) ; Model Study of
Effects of Dikes on the River Bed at Walkers Bar, Ohio River; Ex-
periment to Determine the Effects of Proposed Dredged Cut-Offs in
the Mississippi River (out of print) ; Model Study of Effects of O'per-
ating Birds Point-New Madrid Floodway (out of print) ; Experiment
to Determine the Effects of Mississippi River Backwater on the Red
River; Model Studies of Dike Location; Investigations of Certain
Proposed Methods of Bank and Embankment Protection; Model
Study of Shoaling Below Starved Rock Lock and Dam, Illinois River;
Model Studies of Spillways for St. Lucie Canal, Martin County,
Fla.; Model Studies for Channel Stabilization, Mississippi River;
Experiments to Determine the Backwater Effects of Submerged Sills
in the St. Clair River; Studies of River Bed Materials and Their
Movement With Special Reference to the Lower Mississippi River;
A Model Study of Maintenance Works at Ballona Creek Outlet,
Venice, Calif.
   The Waterways Experiment Station is operated under a revolving
fund which is reimbursed quarterly, the costs thereunder being ab-
sorbed as overhead in the various Mississippi River Commission dis-
tricts, thereby reducing costs incurred by the office, president, Mis-
sissippi River Commission, to nothing. All costs for operation of
the Waterways Experiment Station for the fiscal year 1937 were
incurred from regular funds and amounted to $320,429.08, which in-
cludes $159,880.29 collected from various Government offices and com-
mercial concerns for construction of models, laboratory tests, etc., and
$160,548.79 absorbed as overhead in districts under supervision of this
office. The total cost incurred for operation of the Waterways Ex-
periment Station to June 30, 1937, amounted to $1,770,452 ($1,762,-
482.41 from regular funds and $7,969.59 from National Recovery
Administration funds), of which $391,190.70 was collected from
various Government offices and commercial concerns for construction
of models, laboratory tests, etc., and $1,379,261.30 absorbed as over-
head in districts under supervision of the Mississippi River
Commission.

SUMMARY     OF WORK ACCOMPLISHED WITH NATIONAL RECOVERY                         ACT
          FUNDS 13 DURING FISCAL YEAR ENDING JUNE 30, 1937

  Memphis district.-No work was performed with National Recov-
ery Act funds during the fiscal year 1937 in the Memphis district.
   Vicksburg district.-No work was accomplished with National Re-
covery Act funds during the fiscal year 1937 in the Vicksburg
district.
  18 The amounts shown are not additions to the detailed report but are a part of the
amounts given therein.
                        MISSISSIPPI RIVER COMMISSION                                1751
   Second district, New Orleans.-Work accomplished with National
Recovery Act funds during the fiscal year 1937 in the second district,
New Orleans, consisted of placing 677,059 cubic yards of earthwork
in levees in the Atchafalaya Basin; the work consisted of construc-
tion of the protection levees to full grade and section, under section I
of the May 15, 1928, Flood Control Act; all existing National Recov-
ery Act contracts were completed during the fiscal year. No work
was done with National Recovery Act funds on the Mississippi River
main levees during fiscal year 1937.
SUMMARY  OF WORK ACCOMPLISHED WITH EMERGENCY RELIEF                                   ACT
     FUNDS 1" DURING THE FISCAL YEAR ENDING JUNE 30, 1937

  Memphis district.-The following work was accomplished in the
Memphis engineer district during the fiscal year ending June 30,
1937, with Emergency Relief Act funds; White River at Clarendon,
Ark., enlargement of existing ring levee and new levee where neces-
sary; 221,993 cubic yards placed during fiscal year 1937, 100.0 percent
complete; remaining to be placed, 0 cubic yards.
  NoTr.-Levee work with Emergency Relief Administration funds was done on
the Arkansas River at Tulsa, Okla. (190,059 cubic yards placed, 68.3 percent
complete, with 154,239 cubic yards remaining to be placed), and at Arkansas
City, Kans. (466 cubic yards placed, 100.0 percent complete). This work on
the Arkansas River is reported in the Memphis district annual report, river
and harbor work.
   Vickcsburg district.-No work was accomplished during the fiscal
year ended June 30, 1937, in the Vicksburg, district with Emergency
Relief Act funds.
   Second district, New Orleans.-No work was accomplished during
the fiscal year ending June 30, 1937, in the second district, New
Orleans, with Emergency Relief Act funds.
   Resum of river stages during fiscal year of 1937.-During August
and September 1936 unusually low water prevailed with minimum
recorded stages below mean low water from Cairo, Ill. (0.0) to
Donaldsonville, La. (895).2 Record low stages occurred on the Mis-
sissippi River at Cottonwood Point, Mo. (125); Fulton, Tenn. (175);
Sunflower Landing, Miss. (354); Arkansas City, Ark. (438)4 Green-
ville, Miss. (480); Lake Providence, La. (542); and Natchez, Miss.
 (706). The following tabulation shows the low water stages at
principal gages on the Mississippi River and tributaries for 1936
together with previous low record.
  14 The amounts shown are additions to the detailed report; the financial
                                                                             statements in
detailed report, however, include this work.
  2 Figures in parentheses denote distance in miles below Cairo, Ill., gage.
                                                                                                                                                                                               Lowest water in 1936
                                                                                                                              on record
                                                                                                                       water on
                                                                                                                Lowest water     record                                                        Lowest water in 1936
                                                                                                                                                                                                                                          Difference
                                                                                                                                                                        I
                                                                                                                                                                                                                                          compared
                          River and location of gage                                                                                                                                                                                      with lowest
                                                                                                                     Date                              Gage read-                                Date                          Gage read- on record
                                                                                                                                                          ing                                                                     ing
                                                                                          *1                                                                                                                                                  I
Mississippi River:                                                                                                                                             Feet                                                                 Feet          Feet
     St. Louis, M o.......... ...                ..--- .------ .-- ----.-.--                    Dec. 29, 1933.....................                    .         -4. 5       Aug. 27-30_-. - -.---------------                        -4. 1          +0.4      O
     Cape Girardeau, Mo.................................                                        Jan. 15, 1909.......__.....                     -_ _- __            .6      Aug. 30-Sept. 1....... ..-- - -----                          5.6        +5.0
     Cairo, Ill---- ---------......................                                             Dec. 24, 1871--------------..----------                         -1.0        A ug.22_. - - - - - - - - - - - - - -                        5. 1       +6.1
     Columbus, Ky--....-                     -.............................                     Nov. 6-8, 1895........ -.-----.-----                                .05     Aug. 22_..... ...                      . ..........          5.0        +4.95
     New Madrid, Mo....... ..................                               ._                 _.. do-_
                                                                                              .....    .       ..    -- - ---.. --.-....-            _ _            .55     Aug. 22................ .... .........                       2.38       +1.83     0
     Cottonwood Point, Mo ..... _.........................._                                    Nov.5-8,          1895.......     .--------------               -3.35       Aug. 23....._                               ... _ _      -3.45           -. 10
     Fulton, Tenn...............................                                                Sept. ... 14, 1925....... _ --.. ..------.                        -. 50     Aug. 24.... _ _ _                            .. . --- ----2._ 05        -1.55
     Memphis, Tenn- .......                                                                     Nov._6-9, 1895.----------.                          - ...... -2.- 65   __   Aug. 25 .... ..                                . ..          0.0        +2. 65
     Mhoon Landing, Miss...- ---                        _" .............                        Nov. 6-11, 1895-- ..........--.--.---
                                                                                              .......                                                           -7.8        Aug. 25... _-_-                                          -4. 2          +3. 6
     H elena, A rk-..............................                                               Nov. 8, 9, 1895---------.......                                 -3. 0       Aug. 26 __...                                              -. 2         +2.8
     Sunflower Landing, Miss- .........................                                         Nov. 12-14, 1895.--__.---------_                             _ -1.5         Aug. 27-29_ .........................                    -2.5           -1.0
     Mouth of White River, Ark_......._..                                        _.__ _______   Dec. 28, 1872.........................                             0.0      Aug. 27 ..................            _ .. ..       .        2. 45      +2. 45
     Arkansas City, Ark-....... ...........                           ................          Nov. 9, 10, 1895...--------------.------                        -3.6        Aug. 30_ ...-.......................                     -5.0           -1.4      0
     Greenville, Miss--- ..................                                                     Nov. 10, 11, 1895...........__.....                             -2. 55      Aug. 27-31 ... ..--------------------                    -4. 2          -1.65
     Lake Providence, La ...................                     __ ........                   ....
                                                                                                Nov. 17, 1895 .......---------                              .--- -5.3       Sept. 2 -_-   __           -- - - -                      -5. 35           -. 05
     Vicksburg, Miss. (canal gage)..-----..___.......                                    .......Nov. 13, 14, 1895....................                           -6.5        Aug. 30-Sept. 2--                    ---              -  -3. 1          +3.4
     St. Joseph, La ..-------..................... .........                                    Nov. 13, 1895...._ _ --.....-----                               -9.3        Aug. 31-Sept. 2----                - -                   -7. 5          +1.8
     Natchez, Miss.---------...................                           .....                 Nov. 13-15, 1895......-------_ _ .---                             -. 85     Sept. 2, 3- - -               - -           - -          -1. 1            -. 25
     Angola, La......--............. ......                      .                        .......Nov. 14, 1895-....... ............--...                          -. 6      Sept. 1-5        , 5. .. ----------                          1.8        +2.4
     Bayou Sara, La ....                ----------------                                        N ov.16, 1895.. ---.------.. ---------.- -2.8                               Aug. 31, Sept. 1-----------------------                  -1.4            +1.4
     Baton Rouge, La.-------------------                                                        Nov. 14, 1894......-............_.__                                .45     Sept. 1- ------------------------------                      2.0        +1.55
     Plaquemine, La......-----------------..............                                        ...-do...............................                             -. 94     Sept. 1, 5-- - - -- - - -- - - -- - - - 1.0                             +1.94
     Donaldsonville, La ....................................                                   Jan. 12, 1918............-..........._                               .8      Aug. 5, Sept. 4, 5---            --------                    2. 3       +1.5
     College Point, La.---            -       -               --                                                                                                -1. 02
                                                                                                                                                          - - do.---        Aug.-------------
                                                                                                                                                                                  5, Sept. 4, 20....                                      .7        +1.72
     Carrollton, La.---..............                                                           Dec. 27, 1872_-----------                                       -1.60       Sept. 5__                                                     .89       +2. 49
     Chalmette, La------------___---.-..                                      ------- Nov. 29, Dec. 1, 1924................                                        1.95     Aug. 4, 5, Sept. 5, 7, 23, 24,Oct. 31..                      3.0        +1.05
     West Pointe a la Hache, La_............__                                                  Nov. 5-7, 1930-.......----.----_                        ----- -. 3          July 29 ...                                                   .3         +. 6
     Fort Jackson, La ..............                                                          (Dec.      7,  1893_
                                                                                                                                     _
                                                                                                Nov. 12, 14, 1894---------------------                              .3      July 29, Aug. 12__.....                 _ .___-              2. 1       +1.8      ..,
Arkansas River: Little Rock, Ark....                                                              ... 24,
                                                                                                Aug.      ____1934......-.................                      -2. 93      Sept. 11, 12.......                - -          -          -. 6         +2. 33
Atchafalaya River:
     Simmesport, La-                                             ....................................
                                                                                                Nov. 8, 1891---------------------------                         -3. 5       Sept. 4-7... _                               -1.6                       +1.9
     Morgan City, La------..................                                                    Aug. 25,.......
                                                                                                              1926----- .............----.                      -2. 5       Jan. 20 ..-----       ----------------         1.5                      +4. 0
Black River: Jonesville, La.................................. Oct. 23, 1931 .......----                                                             ---            5.4      Aug. 22_ ..                                    3.97
                                                                                                                                                                                                    .---------------- --.----                       -1.43
Ohio River: Pittsburgh, Pa.----..................                                               Sept._ 28, .. 1881.-----
                                                                                                                .                      .......      . . ----_1.9            July 23, Sept. 26. ....                        9.5                      +7.6
Ouachita River: Monroe, La .....                                                                Sept. 13-20, 1909....----                                    .---1.8        Apr. 7. _                                     12.6                     +14.4
Red River: Alexandria, La..... .... _                       ...........-.-........              Sept. 29, 1881 _...... _ _                     _ _. --- -3.7                Sept. 23 .           .----- --------- ------ -1.08                      +2.62
St. Francis River: Parkin, Ark. (Missouri Pacific R. R. Nov. 3-11, 1901......                                                          --------------             -. 05     Aug. 29-Sept. 2_.......................7                                 +. 75
  bridge).
White River: Clarendon, Ark....-.-----......--.-.-.-....- Nov. 22, 1887................ .......                                                                    4. 07    Sept. 2, 3 ..... _....__--_--------...                     4.6           +. 53
Yazoo River:
     Greenwood, Miss---- ..                                                                     Nov. 1, 1904 .....                     --          _ ____ -. 1              Sept. 7-10- .           ..-------------                    2.4          +2.5
    Yazoo City, Miss--- -..................                                                     Nov. 17, 1931.........................                             1.5      Sept. 2, 3..         ----------------------                2. 5         +1.0
                                                                                          i
                          MISSISSIPPI RIVER COMMISSION                            1753
   In January 1937 heavy rains over the middle and lower Ohio River
Basin caused a record flood on that stream, with a maximum dis-
charge of about 1,850,000 cubic feet per second at Cairo, Ill. (0.0).
Although the Mississippi River above Cairo added relatively little
to this discharge, yet its contribution of about 164,000 cubic feet per
-second brought the total discharge below the junction of the Ohio and
Mississippi Rivers to something over 2,000,000 cubic feet per second.
Record stages were experienced at all stations from Cairo, Ill. (0.0),
to Sunflower Landing, Miss. (354)2 and at Natchez, Miss. (706), with
.crest stages of 59.51 feet at Cairo, 50.4 feet at Memphis, 60.21 feet at
Helena, 56.1 feet at Sunflower Landing, and 58.04 feet at Natchez.
Although stages at all points between Cairo and Sunflower Landing
exceeded the previous record highs of both 1913 and 1927, the crest
at Arkansas City, Ark. (438), was 6.54 feet below the crest stage
of 1927 and 5 feet below the crest stage of 1929; at Greenville, Miss.
 (480), 2.4 feet below 1927 and 1.0 foot below 1929; and at Vicksburg,
-Miss. (602), 2.9 feet below 1927 and 0.3 foot above 1929. This was
due to the stage lowering effect of cut-offs and low stages on the
Arkansas and White Rivers. Throughout the central portion of the
river the effect of cut-offs in lowering the flood plane was considerable.
At Arkansas City for rising stages above 45 feet the discharge ranged
from 500,000 to 700,000 cubic feet per second in excess of that car-
ried at the same stage in 1929. Below the Greenville Bends the
1937 crest was about 1 foot below that of 1929, although the flow was
:about 20 percent greater. At Vicksburg the rising branch of the
rating curve showed an improvement in carrying capacity since 1929
of about 370,000 cubic feet per second for stages above 45 feet. The
1937 high water is of particular interest not only from the results
,of the cut-offs but one indicating the results of the operation of both
the Birds Point-New Madrid floodway in Missouri and the Bonnet
{Carre spillway and floodway in Louisiana provided for in the May
_15, 1928 Flood Control Act, and utilized in 1937 for the first time
since their completion. The Birds Point-New Madrid floodway was
,opened to flood waters by blasting the front-line levee when a stage
'of about 58.4 feet was reached on the Cairo, Ill., gage, on January 25,
1937, after natural crevasses had started in the vicinity of Crosno,
Mo. (17)2 and Copp Cypress. The flood waters overtopped, crev-
assed, and scoured the river-front levee in many places and inundated
the entire floodway, which, at the crest stage of 59.51 feet at Cairo,
was carrying approximately one-fourth or about 500,000 cubic feet
per second of the entire flood flow of the river, at that latitude; the
flow of water into the floodway developed three crevasse groups in
the 11-mile upper fuse-plug section, four between river miles 18 and
30, and one near river mile 49; outflow developed one large crevasse
and many smaller crevasses and scours between river miles 40 and
47 and numerous crevasses in the lower fuse-plug section; after the
.January-February rise all of the openings except near river mile 49
and in the lower fuse-plug section were closed by interim levees under
repair contracts, or by emergency work of sufficient magnitude to
prevent headwater flooding from the rise of May 1937; the break
near river mile 49 admitted some headwater to the extreme south
part of the floodway and increased the stage of backwater slightly;
the operation of the floodway during the January-February rise
  2
      Figures in parentheses denote distances in miles below Cairo, Ill., gage.
1754    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

materially affected the stages and discharges from Cairo, Ill., to New
Madrid, Mo. (71).
   The Bonnet Carre spillway and floodway, located from mile 941.5
to 943.2 approximately 33 miles above New Orleans, La., was de-
signed to divert a maximum discharge of 250,000 cubic feet per
second from the Mississippi River into Lake Pontchartrain. Grad-
ual opening of the spillway bays was begun on January 28, 1937, with
a stage of 14.1 feet on the Carrollton, La. (New Orleans), gage
and was continued until February 18, at which time 285 of the 350
bays were in operation. A maximum flow of approximately 211,000
cubic feet per second was observed on February 25 with 285 bays
in operation, with a stage of 19.0 feet on the Carrollton, La. gage.
Gradual closing of the bays commenced on March 7, and was com-
pleted on March 16, 1937. The rate of opening the bays was planned
so as to prevent the Carrollton gage exceeding 20 feet. The closing
schedule attempted to diminish the daily weir discharge by an
amount approximately equal to the decrease in river flow, and thus
hold the Carrollton gage stationary. In the Memphis district,
where record high stages were recorded, numerous crevasses, both
artificial and natural, occurred along the entire length of the Birds
Point-New Madrid floodway front line levee; four crevasses occurred
in the Slough Neck dike and one in the Watson Point dike above
Tiptonville, Tenn.; low sections of levee throughout the district were
topped with sand bags or bulk heading, and no breaks occurred in
the main levees. In the Vicksburg district levees were not threatened
at any point in.the district; a small amount of topping was done to
increase freeboard; as a result, minimum freeboard in the district was
6 feet at the crest of the flood ranging up to 12 feet throughout a
considerable part of the district. In the second district, New Orleans,
the principal activities of the high water fight consisted in topping
main line levees on the Mississippi River not yet brought up to
the 1928 grade and section and similar work in the Atchafalaya
Basin.
   Construction work under the flood-control program throughout
the lower Mississippi River Valley was appreciably retarded during
the entire period of high river stages together with unfavorable
weather conditions. The flood was carried to the Gulf of Mexico,,
without crevasses on the main levee system and without appreciable
damage to the main levee system, as a result of the progress made
in flood-control work during the past 9 years.
   The following tabulation shows the crest stages in 1937 on the
principal Mississippi River gages from Cairo, Ill., to Fort Jackson,
La., together with highest stages of record prior to 1937 and the 1929,.
1932, 1933, 1934, 1935, and 1936 crest stages:
                                                   Highest water in 1937                  Highest water on record prior             Difference                        Highest water in-
                                  Miles                                                                  to 1937                    compared
River and location of gage       below                                       Gage                                        Gage       st high-                      1933 gage 1934 gage
                                  Cairo                  Date                 read-                 Date                  read-     st on rec- 1929 gage 1932 gage 1933 gage 1934 gage 1935 gage 1936 gage
                                                                               ing           ing                           ing       to 1937_
                                                                                                                                    ord prior reading reading reading         reading   reading   reading

UNITED STATES ENGINEER
          GAGES
Mississippi River:                                                  Feet                                     Feet                      Feet      Feet       Feet        Feet      Feet       Feet      Feet
   Cairo, Ill__ ............          0.0   Feb. 4..........------- 59.51 Apr. 20, 1927-.........            56. 40                    +3.11     52. 7      49. 06       51.87     41. 25    49.87       52. 80
   Wickliffe, Ky- .........           4. 3                          58. 2  Apr. 15-17, 1936....... 1 52. 35
                                             . do----------...............--                                                         2+5.  85                            51.77    41. 04     49. 59      52. 35
   Columbus, Ky..........            21. 6 Jan. 25_.-------------   54. 5   Apr. 16, 1927_-----              51. 00                    +3. 50     49. 3     46. 38       48. 7     39. 10     47. 30    49.6
   Hickman, Ky- ....--------         35.9   Feb. 1-------------     51.5    Apr. 16, 17, 1936...----       3 46. 32                  4+5.   18              43. 2        45. 4     35.9       44. 06    46.32
   New Madrid, Mo__-----             71. 0 Feb. 3--...----------... 47. 97 Apr. 9, 1913- .-          ....    44. 61                    +3. 36     41.42     39. 01       40.80     32.88      39.94      41.44
    Cottonwood Point, Mo_           124. 5 Feb. 6, 7 -----------.. 44. 4    Apr. 11, 12, 1913......          42. 30                    +2. 10     37. 65    36. 2        36. 86    29.39      35. 84     37. 0    0
    Fulton, Tenn-.........          175. 4 Feb. 9------------       47. 25 Apr. 9, 1913-...----- 44. 07                                +3. 18     38.00     34. 72       36.58     27. 22     34. 83     37.15
    Memphis, Tenn-.......           227. 0 .._-do ..-------------   50. 4 ---.. do------       ...--------   46. 55                    +3. 85     41.5      38. 7        40. 4     29. 98     38. 21     40.5
   Mhoon Landing, Miss.._           273.2   Feb. 10 ....--.-------- 53. 20 Apr. 25, 26, 1927-....._          47. 00                    +6. 20     44. 8     42. 58       43. 87    33. 99     42. 32     43. 82
   Helena, Ark.........             307. 1 Feb. 12 ._-------------  60. 21 Apr. 27, 1927-..........          56. 75                    +3. 46     52. 62    49. 2        50. 62    36. 77     48. 94     50. 65
    Sunflower Landing               353. 7 Feb. 11-12........-----  56. 1   Apr. 22, 1927..........          53. 20                    +2. 90     50. 7     47. 28       47. 77    35. 0      46. 63     46. 1
Miss.
    Mouth of White River,           393. 2   Feb. 14 ............            -1 57.90    Apr. 21, 1927.........            60. 25      -2. 35     57. 30     53. 08      53. 23    42. 05     52. 57     48. 45
Ark.
    Arkansas City, Ark .--                     do ..--------------
                                    437. 5 ..--...-                            53. 86 .....do......-......                 60. 40      -6.54      58. 8      53. 45      53. 63    38. 99     51. 75     41. 4
    Greenville, Miss.... ....       480. 2  Feb. 15--__----------              52.25 ----- do--.....------------           54. 60      -2. 35     53. 25     46. 97      47.17     32. 81     45.46      40. 9    C
    Warfield Point, Miss ...        485. 6 Feb. 16..............               50. 76    ----------...-....                 (6)
    Lake Providence, La- .          542. 3  Feb. 15_ _        .....
                                                               ________        47. 68 Apr. 21, 1927-..........             50. 70      -3. 02     49.55      45. 2       44.52     31.19      42. 45     38.11
    Vicksburg, Miss ......          601.8   Feb. 21,22- ....-------            55.5     May 4, 1927..---..-_               58. 40      -2. 90     55.2       51.9        48. 92    35. 2      48.0       44.3
    St. Joseph, La_.....-__         662. 7 Feb. 20_____ ______ .               54. 00 ....-- do-------------...........    54.65        -.65      51.7       48. 9       46. 99    33. 9      46. 62     42. 2
    Natchez, Miss..........         705.7   Feb.21 ----------                  58. 04 - --- do....-.....-----              56. 65      +1.39      54. 5      52. 51      50. 4     37.6       50. 4      46.1
    Angola, La----....------        771.4   Feb. 27, 28--..-------....         55.50 May 14-17, 1927......                 57. 45      -1.95      52. 4      52. 4       48. 0     36. 59     47. 97     42. 8
    Bayou Sara, La.........         807. 3 Feb. 27-Mar. 1_..--.--              48.85      May 15, 1927.........            51.70       -2.85       46. 7     45. 94      41. 05    30.12      41. 42     36.0
    Baton Rouge, La. .__-           842. 4 Feb. 28 .--------------             45. 00    .... do.......- ..-..----         47. 80      -2. 80      43. 5     42.78       38. 51    28. 5      38. 53     33. 3    r
    Plaquemine, La -------..        862. 8 Feb. 26, 27, Mar. 1 ..--            40.50     .....- do__.     ----             43. 00      -2. 50      38. 85    38. 3       34. 18    25. 01     34. 53     29.4     2
    Donaldsonville, La......        895. 4 Feb. 27.-------.....----            34. 48    .....- do-------     ---          37. 20      -2. 72      34. 0     33. 6       30. 1     21.97      30. 18     25. 8
    College Point, La ......        913. 1 Feb. 28----             -------     29.0      -_ _do ..--------------           31.90        -2. 90     29. 2     28. 77      25. 7     18. 41     25. 6      21.8     O
    Bonnet Carre, La_.__ .          942. 2 Feb. 18, 25-Mar. 1 ....             21.9                        _____
                                                                                           June 10, 1929 ....             623.71        -1.81    6 23. 71    23. 09      20. 9     15.01      21. 0      17. 7
    Carrollton, La _-        --     966. 7 Feb. 28                    ---      19. 29      Apr. 25, 1922 -------           21. 27      -1.98       19.99     19. 17      17. 46    12. 48     17. 38     14. 6
    Chalmette, La-...------         979. 6 Feb. 21, 24-Mar. 13....             18. 3       Apr. 25, 26, 1927 ....         719. 80      -1.50       19. 0     18. 38      17.3      13. 0      17. 2      14.8
    West Pointe a la Hache,       1,021.0   Feb. 19, 25-Mar. 1 ...              9. 6       Apr. 23-26, 1927.....           8 9.80        -. 20      9. 5      9. 16       9.2       6.9        8. 87      7.6
       La.
    Fort Jackson, La.._--.__      1,051.2     Feb. 19, 26, 27       ------       8. 60    Apr. 26,1922 .. ...               9.60       -1.00        8. 55     8.13         8.4       6. 76     8. 07      7. 5

    1 Wickliffe gage established Aug. 30, 1932; high water of 1927 on high-water gage 182 referred to present Wickliffe gage would read 56.45 feet.
    2 Difference between 1927 high water and 1937 high water is 1.75 feet; see footnote no. 1.
    3 Hickman gage established Nov. 7, 1929; high water of 1927 on temporary gage at Hickman referred to present Hickman gage would read 48.3 feet.
    4 Difference between 1927 high water and 1937 high water is 3.2 feet; see footnote no. 3.
    b Warfield Point gage established Aug. 17, 1936.
    6 Bonnet Carre gage established Mar. 18, 1930; 1929 reading from temporary gage.

    7 Chalmette gage established Oct. 23, 1923.
     1 West Pointe a la Hache gage established Feb. 24, 1926.
1756    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

    Tributary rivers and outlets below Cairo, Ill.-Food stages pre-
vailed along the entire St. Francis Basin, and moderate stages oc-
curred on the Arkansas and White Rivers with high stages in the
White backwater area during the major portion of January and Feb-
ruary 1937 in the Memphis district. In the Vicksburg district
medium stages prevailed on the Red River during the spring of 1937,
with highest stage at Alexandria, La., of 33.0 feet on February 2.
Stages were high on the Yazoo River but of comparatively short
duration; flood stage was exceeded at Greenwood, Miss., from Feb-
ruary 6 to 11, with a crest of 36.4 feet on February 9; flood stage was
exceeded at Yazoo City, Miss., February 4 to March 30, with a crest
of 37.1 feet on February 24 and March 1. In the second district,
New Orleans, the 1937 high water also affected the Atchafalaya
River and Basin but no new records were established in the Atcha-
falaya River above Atchafalaya, La.; on the Atchafalaya River at
Simmesport, La., the highest stage recorded during the 1937 high
water was 49.3 feet on March 1 to 4; this was 4.1 feet below the
highest reading on record (53.4 feet on May 16, 1927); at Atcha-
falaya, La., the highest stage recorded during the 1937 high water
was 25.9 feet on March 7-9; this was 1.0 foot above the highest
reading on record (24.9 feet on March 3-5, 1932); no crevasses
occurred during 1937 and the water passed to the Gulf of Mexico
with but trifling damage; as a result of extensive dredging and
levee work in the Atchafalaya Basin the water to the landside of
the east and west protection levees was from 2 to 15 feet lower than
within the guide levees.
    Mississippi River and tributaries above Cairo, Ill.-No exceptional
highwater stages occurred within the flood-control limits of the Rock
Island district nor the St. Louis district, except backwater from the
Ohio River flood of February 1937, which reached the 1927 flood
stage at Beechridge, Ill. (mile 13.2 above the Ohio River), and
exceeded the 1927 stage below Beechridge. The crest reading at
Beechridge on February 3, 4, and 5, 1937, was 46.9 feet on the gage.
    Operations under the act of June 15, 1936.-In the Memphis dis-
trict no construction work was performed on projects authorized by
the amendment, Public, No. 678, Seventy-fourth Congress, approved
June 15, 1936, to the Flood Control Act of May 15, 1928. Surveys
were practically completed and preliminary plans were submitted
for the St. Francis River and White River emergency reservoir
projects.
    In the Vicksburg district work consisted of operations in connec-
tion with the Eudora floodway. Detailed plans and estimates were
begun; aerial photographic surveys were completed; right-of-way
and ownership surveys were completed; preparation of tract maps,
appraisals by the Department of Agriculture and Forestry Service,
and taking of options were begun and are still in progress; third
order control, topographic, drainage, and levee location surveys have
been completed.
    In the second district, New Orleans, a diversion channel was com-
pleted on Bayou Courtableau below Port Barre to facilitate the run-
off in the bayou and to bypass the flow intercepted by the construc-.
tion of the west guide levee across the bayou at this point. The State
canal, along the north side of Highway No. 7, was cut through the
west guide levee to provide drainage for the large area betwen the west
                  MISSISSIPPI RIVER COMMISSION                   1757
guide levee and the west Atchafalaya River levee. This canal also
furnishes additional water for the rice growers along Bayou Teche
and the Vermilion River. Preliminary surveys and studies were
made for the enlargement of the landside pits between Hamburg and
Palmetto in order to provide for drainage intercepted by the west
guide levee in this locality. Plans and studies have been made for
the connection of the borrow pits along the west guide levee in the
vicinity of Palmetto; the completion of this connection will allow the
closure of the gap at Bayou Rouge. Plans and studies have been
made for the construction of highway and railroad bridges. Sur-
veys and plans have been made for the construction of the navigation
and drainage canal between Charenton and Baldwin; this canal will
establish an outlet for the drainage intercepted by the west guide
levee and allow closure of gap at Grand Avoyelles Cove. Property
surveys and mapping in connection with the Morganza floodway, west
Atchafalaya floodway and outlet west of Berwick, have been com-
pleted except for minor changes required from time to time as a
result of changes in ownership. The obtaining of options for fee
simple purchase and for purchase of flowage easements was prose-
cuted vigorously during the year. Preliminary surveys and studies
have been made with the idea of utilizing the crowns of the guide
levees for roads in locations otherwise inaccessible. The status of
options is as follows: Morganza floodway, options for fee simple
purchase have been obtained and recorded covering approximately
54.2 percent of the value of the lands in the floodway, options for
purchase of flowage easements have been obtained covering approxi-
mately 26.6 percent of the value of the lands in the floodway. West
Atchafalaya floodway, options for fee simple purchase have been
obtained and recorded covering approximately 16.3 percent of the
value of the lands in the floodway; options for purchase of flowage
easements have been obtained covering approximately 10.4 percent
of the value of the lands in the floodway. Outlet west of Berwick,
options have been obtained covering a dredging easement over 1.3
percent of the acreage in Wax Lake outlet. Agreements as to price
have been reached on 26 percent of the acreage, but options have
not been received to date due to mortgage and other delays; the
United States Attorney General has been requested to institute con-
demnation proceedings for the acquisition of the remaining lands in
the Wax Lake outlet.
                                          H. B. FERGUSON,
                     Brigadier General, Corps of Engineers,
                   President of the Mississippi River Commission.

REPORT OF BOARD ON EXPERIMENTAL TOWBOATS FOR MISSISSIPPI RIVER AND-
                           TRIBUTARIES

  In compliance with the River and Harbor Acts approved June 25,
1910, and July 27, 1916, a Board of Engineer officers was appointed
for the purpose of designing and constructing two experimental tow-
boats for use on the Mississippi River and its tributaries.
  The total costs and expenditures to date have been $452,618.54, of
which $429,376.57 was for new work and $23,241.97 for maintenance.
  FoQr further details concerning prior activities under this heading
see page 1718, Annual Report for 1935, and page 1734, Annual Report
for 1936.
 1758        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                                              Cost and financial summary
                                         (EXPERIMENTAL TOWBOAT                            BOARD)

Cost of new work to June 30, 1937_1111111111111111111111                                                               $429, 376. 57
Cost of maintenance to June 30, 1937___ ___-     -23,
                                             __-______-___-                                                                  241.97
       Total cost of permanent work to June 30, 1937 --------------                                                     452, 618. 54
Net total expenditures ------------------------------------------                                                       452, 618. 54
Total amount appropriated to June 30, 1937------------------                                                            452, 618. 54

   Fiscal year ending June 30                     1933                1934                 1935           1936              1937


Cost of new work.----------------                  $32. 11 ..............--------------   $9, 055. 09    $3, 944.91             - $10. 01
Cost of maintenance..---------- ------------------                                        ---------- -------------- -------------
Total expended--------------            ---        802. 47                                 8, 309. 60     4, 604. 72               75. 67
Allotted-.   ----------------------------------                                           47, 371. 45                           -- 10.01


Balance unexpended July 1, 1936----------------------                                                                       $85. 68
Deductions on account of revocation of allotment                                                                              0. 01
                                                                                                                             1-----------------

      Net amount to be accounted for----------------------------__                                                              75. 67
Gross amount expended----------- -----------------               -                                               -       -75.       67

   PERMANENT             INTERNATIONAL                       ASSOCIATION                  OF      THE   CONGRESSES              OF
                                                         NAVIGATION

    1. By an act approved June 28, 1902, Congress appropriated the
sum of $3,000 per year for the support and maintenance of the Per-
manent International Commission of the Congresses of Navigation
and for the payment of the actual expenses of the properly accredited
national delegates of the United States to the meetings of the con-
gresses and of the Commission. Beginning with the fiscal year 1936,
such expenses were paid by allotment from the general appropriation
for the improvement and maintenance of river and harbor works.
The object of the association is the promotion of inland and mari-
time navigation by means of organized congresses, and the publica-
tion of pertinent information. Its headquarters are in Brussels, Bel-
gium, but the congresses are held in various countries upon invitation.
   2. The association is supported principally by member nations,
but the privileges of membership are also extended to corporations
and libraries, as well as to individuals. Governments are repre-
sented by delegates, the number of delegates being based on the
amounts received annually from such governments and their na-
tionals for the expenses of the Commission. Corporate membership
may include the privilege of representation by delegate, or not, ac-
cording to the amount of the annual subscription paid by the holder
of each membership of this class. Life individual membership may
be secured upon the payment of a single fee, or ordinary individual
membership upon the payment annually of a fixed fee.
   3. The general affairs of the association are managed by a per-
manent commission with the assistance of the permanent council.
The commission is composed of delegates from the supporting gov-
ernments, and the council from the members of the permanent
commission, the representation in each case being according to the
amount of the annual contribution.
   4. During the fiscal year the United States was represented as
follows :
                   INTEROCEANIC CANAL SURVEYS                      1759
   On the American section of the permanent commission-by Col.
Spencer Cosby, United States Army, retired, chairman; Lt. Col.
Gordon R. Young, Corps of Engineers, United States Army; Brig.
Gen. Charles Keller, United States Army, retired; Mr. J. Spencer
Smith, president of the Board of Commerce and Navigation of the
State of New Jersey; Mr. Roy Miller, active vice president of the
Intracoastal Canal Association of Louisiana and Texas; Brig. Gen.
Herbert Deakyne, United States Army, retired; Col. Thomas H.
Jackson, Corps of Engineers, United States Army, until he died on
April 7, 1937; Lt. Col. Glen E. Edgerton, Corps of Engineers,
United States Army; Comdr. W. H. Smith, Civil Engineer Corps,
United States Navy; Col. Wildurr Willing, Corps of Engineers,
United States Army, to July 27, 1936; Maj. William A. Snow,
Corps of Engineers, United States Army, from that date to June
28, 1937, and Lt. Col. Raymond A. Wheeler, Corps of Engineers,
United States Army, since the latter date. Colonel Willing, Major
Snow, and Colonel Wheeler served as secretary of the American
section during the periods stated above; and
   On the American section of the permanent council-by Colonel
Cosby and General Keller.
   5. A meeting of the Commission was held in Brussels, Belgium, on
June 8, 1937, when the United States was represented by Colonel
Cosby; Lt. Col. Edwin H. Marks, Corps of Engineers, United States
Army; Lt. Col. John C. H. Lee, Corps of Engineers, United States
Army; and Lt. Col. Paul S. Reinecke, Corps of Engineers, United
States Army. Copies of the account of the sixteenth congress, and
of the two semiannual bulletins, all printed in English, were received
from the central office in Brussels and distributed to the American
members. Chapter 8 of the Illustrated Technical River and Harbor
Dictionary on Locks and Dry Docks was also received and distrib-
uted. This is the second chapter issued, no. 10, on Fixed and Mov-
able River Dams having been distributed previously. This work con-
tains, in six languages, the technical designations of the various struc-
tures and their constituent parts, and should prove of great value to
engineers engaged on river-and-harbor improvement work.
   6. The expenditures from the allotment made for the year amounted
to $1,651.31, of which $1,000 was for the support and maintenance of
the association, being the regular annual contribution for that purpose,
and the balance was for the payment of the traveling expenses of dele-
gates from the United States. The outstanding obligations at the
close of the year amounted to approximately $1,348.69 and were for
the expenses of delegates.

                     INTEROCEANIC   CANAL SURVEYS

  The proposed canal route across Nicaragua extends from Brito, on
the Pacific, via the Rio Grande, Lake Nicaragua, the'Rio San Juan,
and the Rio Deseado to Greytown, on the Atlantic, and is 173 miles
long.
  A survey of the Nicaragua route was made in 1901, and Public
Resolution No. 99, Seventieth Congress, approved March 2, 1929,
authorized a further survey to bring the data up to date as well as an
investigation of additional facilities needed at the Panama Canal, to
be made under the direction of the Secretary of War and supervision
      20196--37-pt. 1-111
1760     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

of the Chief of Engineers, with the aid of such civilian engineers as
the President deemed advisable. The President appointed the Inter-
oceanic Canal Board to assist the Chief of Engineers. The Governor
of the Panama Canal made the investigations at Panama and a provi-
sional battalion of United States Engineer troops made the survey in
Nicaragua.
    The report of the Chief of Engineers, together with the reports of
the Interoceanic Canal Board, of the Governor of the Panama Canal,
and of the officer in charge of the survey, was submitted on December
5, 1931, and published in House Document No. 139, Seventy-second
Congress, first session.
    An officer and one enlisted man are stationed in Nicaragua to cony
tinue the collection and compilation of hydrological and meteorologi-
cal data pertaining to the proposed canal.
    During the past fiscal year the collection of these data has involved
the operation within the watershed of Lake Nicaragua of 22 rainfall
stations, 13 stations for making fog observations, 7 stations for collec-
tion of evaporation data, 6 stations for recording lake levels and river
stages, 3 stations for recording barometric pressure and humidity, 2
stations for gaging wind velocity, and 5 temperature stations. River-
.gaging stations are being maintained for measuring the flow of the
Tipitapa and San Juan Rivers.
    The appropriation for the investigation and survey was $150,000,
of which $135,289.88 has been expended to the end of the fiscal year
1937. The continuous collection of hydrological and meterological
data pertinent to the canal in Nicaragua is being paid for from the
amount remaining from the original appropriation and it is estimated
that about $2,500 will be expended in continuing the operations during
the fiscal year ending June 30, 1938.
  INVESTIGATIONS AND SUPERVISION OF PROJECTS UNDER THE FEDERAL
                        WATER POWER ACT

   The Federal Water Power Act of June 10, 1920, created the Fed-
eral Power Commission, composed of the Secretary of War, Secre-
tary of Interior, and Secretary of Agriculture, with authority to
grant permits and licenses for hydroelectric developments in all
waters over which Congress has jurisdiction. The act further re-
quired that the work of the Commission be performed by and through
the Departments of War, Interior, and Agriculture, and their engi-
neering, technical, and other personnel, except as may be otherwise
provided by law.
   By the act of June 23, 1930, entitled "An act to reorganize the Fed-
eral Power Commission", sections 1 and 2 of the Federal Water
Power Act of June 10, 1920, were amended. A commission was pro-
vided for to be composed of five commissioners to be appointed by
the President, 'by and with the advice and consent of the Senate.
The necessity of performing the work through the Departments of
War, Interior, and Agriculture was also removed and the Commis-
sion authorized to appoint such officers and employees as are neces-
sary in the execution of its functions.
   By title II of the Public Utility Act of 1935, approved August 26,
1935, the original Federal Water Power Act was made part I of
the Federal Power Act, and parts II and III added to that act.
                           FEDERAL WATER POWER ACT                                       1761
  The law also provides that no water-power license affecting the
navigable capacity of any navigable waters of the United States
shall be issued until the plans of the dam or other structures affecting
navigation have been approved by the Chief of Engineers and the
Secretary of War. There is further provision whereby any person
or corporation intending to construct project works in any stream
over which Congess has jurisdiction, other than navigable waters,
shall file a declaration of intention for the purpose of ascertaining
whether or not the jurisdiction of the Federal Power Commission
will attach.
   To July 1, 1929, only work of an engineering nature has been
referred to the War Department by the Commission.
   Since that date, in addition to the duties noted below, certain work
pertaining to accounting and related matters has been assigned to the
War Department, as indicated in the following table:
Number of projects on which supervision of all accounting work, including
  the supervision of preparation and the verification and certification to
  the Commission of statements of cost of original project and of all addi-
  tions thereto and betterment thereof and of all annual operating and
  financial reports requested by the Commission has been assigned-- ..--- 3
Number of projects on which supervision of certain accounting and related
  work during the construction period only has been assigned-----------17
Special reports relating to accounting work requested-------------------    5
Special reports relating to accounting work rendered--------------------    5
  To July 1, 1936, the following work of an engineering nature had
been referred to the War Department by the Commission:
Engineering reports submitted            ------------------------------------ 302
Public hearings held----------------------                -------------------  74
Licenses and permits referred for field supervision-------------------        142
Licenses and permits referred for supervision of stream gaging------------ 2
Declarations of intention referred for report------------------------ 121
Reports submitted on declaration of intention------------------------121
  During the past fiscal year work of an engineering nature has
been assigned and accomplished, as follows:
Engineering reports requested--------------------------------------                        5
Engineering reports submitted-----------------------------------                           5
Public hearings held       ---------------------------------------------                   0
Field investigations still in progress          --------------------------------- 1
Licenses and permits referred for field supervision----------------------                  2
Licenses and permits under supervision-----------------------------                       51
Declarations of intention referred for report                                              0------------------
Reports submitted on declaration of intention or applications considered as
  declarations    --       ----------------------------------------------
Declarations of intention still under investigation___             ----------------------
                                                                                     ___
   The necessary expenses of transportation and subsistence of per-
sonnel engaged in investigations and the cost of supervision under
the provisions of the Federal Power Act are paid from appropria-
tions made for the Federal Power Commission. All other costs of,
administration of the laws in question are paid from funds available
for maintenance and improvement of existing river and harbor
work.
   During the fiscal year funds were allotted as follows for the inves-
tigation of water-power projects in cooperation with the Federal
Power Commission and the supervision of operations under water-
power permits and licenses:
From appropriations for the Commission----_           __----_     $4, 002. 20
From appropriations for works of river and harbor improvements___ 14, 774. 56
       Total-----                        --
                                    -______        ____        _____________ 18, 776.76
1762     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  ABANDONMENT AND CURTAILMENT OF RIVER AND HARBOR PROJECTS

  By resolution of the Committee on Rivers and Harbors, House of
Representatives, dated April 18, 1930, a review of reports on abandon-
ment and curtailment of river and harbor projects, printed in House
Document No. 467, Sixty-ninth Congress, first session, with a view to
determining whether any changes in the recommendations made
therein are advisable at the present time, is requested. Information
in response to this resolution is being collected by the Board of
Engineers for Rivers and Harbors and report thereon will be sub-
mitted as soon as practicable.

                MISCELLANEOUS CIVIL WORKS
  In addition to the work of improving rivers and harbors, civil
works of a miscellaneous character as listed below have been com-
mitted to the Corps of Engineers. Reports thereon are found at the
pages indicated.
Beach Erosion Board (p. 1773).
District of Columbia:
     Anacostia Park, reclamation and development (p. 1766).
     Water supply, maintenance of Washington aqueduct (p. 1770) and construe-
       tion of work for increasing supply (p. 1770).
International-boundary waters (p. 1780).
Lake of the Woods, regulation of level (p. 1782).
New York Harbor, supervision to prevent obstructive or injurious deposits
   (p. 1764).
Niagara Falls, preservation of (p. 1781).
Lake Superior Board of Control (p. 1782).
St. Croix River Board of Control (p. 1780).
St. Lawrence River Board of Control (p. 1782).
Survey of northern and northwestern lakes, including Great Lakes, Lake Cham-
  plain, Lake of the Woods, and other boundary and connecting waters between
   that lake and Lake Superior, and natural navigable waters of the New York
   State canals (p. 1775).
   Work accomplished.--The work of the fiscal year is summarized as
follows:
Anchorages established or modified under the provisions of sec. 7 of the
  River and Harbor Act of Mar. 4, 1915 ---- --- -----     ----------      --   3
Bridge plans approved by the Chief of Engineers and the Secretary of
  War under the provisions of sec. 9 of the River and Harbor Act of
  Mar. 3, 1899, and the General Bridge Act of Mar. 23, 1906------------      167
Bridges, obstructive, alteration ordered by Secretary of War under pro-
  visions of sec. 18 of the River and Harbor Act of Mar. 3, 1899______-        5
Bridge rules and regulations established or modified under the provisions
  of sec. 5 of the River and Harbor Act of Aug. 18, 1894 _ _ __ _             10
Dams, other than water-power structures, plans approved by Chief of
  Engineers and the Secretary of War under the provisions of sec. 9 of
  the River and Harbor Act of Mar. 3, 1899_______-________________             4
Harbor lines established or modified under the provisions of sec. 11 of
  the River and Harbor Act of Mar. 3, 1899______________________              7
Navigation regulations established or modified under the provisions of
   sec. 7 of the River and Harbor Act of Aug. 8, 1917________________      10
Permits issued for work or structures in navigable waters under the
  provisions of sec. 10 of the River and Harbor Act of Mar. 3, 1899___ 3, 119
:Sunken vessels investigated or removed under the provisions of secs.
   19 and 20 of the River and Harbor Act of Mar. 3, 1899_-- _---- ---     239
                         MISCELLANEOUS CIVIL WORKS                                1763
   Harbor of New York: Supervision maintained, 58 violations of law reported
for prosecution, 24 convictions obtained, and 70 prosecutions pending at end of
fiscal year.
   Anacostia Park: About 1.1 percent of the project executed during the fiscal
year; project about 83.4 percent completed.
   Washington aqueduct: Water supply maintained without interruption; the
average daily per capita consumption was 162 gallons; the average total con-
sumption per 24 hours was 100,361,000 gallons, the maximum 142,420,000 gallons.
   Survey of northern and northwestern lakes: Revised editions of 41 charts
were issued, 1 new chart published, and 35 charts reprinted; about 31,745 charts
were sold and 7,133 were issued for official use; field work was in progress on
Lake Michigan, Lake Huron, Lake Ontario, St. Lawrence River, Lake Erie, and
St. Marys River.
   Preservation of Niagara Falls: The supervision of power companies was
continued.
  Appropriations.-The funds with which the, miscellaneous civil
works were prosecuted during the year totaled $1,698,991.05 and were
derived as follows:
For investigations, inspections, hearings, reports, service of notice,
or other action incidental to examination of plans or sites of
bridges or other structures built or proposed to be built in or
over navigable waters or to examinations to alleged violations of
law for the protection and preservation of navigable waters of
the United States or to the establishment or marking of harbor
lines or establishment of anchorages: Allotted during year_...         $161, 190. 93
     These funds were allotted from river and harbor appropria-
  tions in accordance with the provisions of sec. 6 of the River
  and Harbor Act of Mar. 3, 1905.
For the investigation and removal of sunken vessels:
     Balance on hand July 1, 1936----------------------                   48,731.18
    Allotted during year          ------------------------------         144,131.15
     Received from sales and reimbursements----------------------                   0
       These funds were allotted from the appropriation "Mainte-
    nance and improvement of existing river and harbor works."
For other civil works:
     Balance on hand July 1, 1936------- --------------             ___  611, 818. 38
    Allotted during year       ______-------
     Received from sales and reimbursements_------__
                                                         _-----_
                                                            -__--
                                                                  --
                                                                     __
                                                                         721,641. 81
                                                                          11, 477. 60
       These funds were made available by special appropriations
     made by Congress in War Department, deficiency, District of
     Columbia, and special acts.
      Total-----------      -------------------------------- 1, 698, 991. 05
  Expenditures.-The total expenditures for the fiscal year, exclusive
of outstanding liabilities, amounting to $152,249.08, were $1,456,786.72,
expended as follows:
For investigations, inspections, hearings, and other action inci-
  dental to administration of Federal laws------------------- $161, 190. 93
For the removal of sunken vessels-------------------     ---------- 156, 515. 20
For other civil works---------------           -------------------- 1,139, 080. 59
       Total ----------------------------------                           1, 456, 786. 72

Total funds available------------------                                   1, 698, 991. 05
Total expenditures ----------------------              $1, 456, 786. 72
Outstanding liabilities --------------------------         152, 249. 08
'Revoked -------------------------------------              12,841. 88
                                                                          1, 621, 877. 68
       Balance available June 30, 1937--___________-----------77, 113.37
1764      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

             FUNDS NEEDED FOR MISCELLANEOUS CIVIL WORKS

  The amounts which can be profitably expended during the fiscal
year ending June 30, 1939, as indicated in the respective reports, are
as follows:
Supervision of deposits, harbor of New York_ .-----.-.-.-.-.         $225, 000
Survey of northern and northwestern lakes-..-.--------.           _   210, 000
Expenditures to be paid from Federal and District of Columbia funds;
  recommended in estimates submitted by the Commissioners of the
  District of Columbia:
    Washington Aqueduct, District of Columbia_ -----         ------   700, 000
    Reclamation of Anacostia River Flats, District of Columbia ___ 250, 000
       Total amount which can be profitably expended for miscella-
        neous civil works under the direction of the Chief of
        Engineers------------------        ----------------------- 1,385,000

            SUPERVISION OF THE HARBOR OF NEW YORK

   Supervisor: Capt. T. H. Taylor, United States Navy.
   The laws enacted for the preservation of the tidal waters of New
York Harbor, its adjacent or tributary waters, and the waters of
Long Island Sound are administered by the supervisor of New York
Harbor, a line officer of the Navy, under the direction of the Secre-
tary of War. The supervisor is charged under the laws with the
duties of preventing any obstructive or injurious deposits in the
waters under his jurisdiction and the prevention of any interfer-
ence with safe navigation of the channels of the harbor by deep-
draft vessels.
   The laws relating to the supervision of New York Harbor are acts
of Congress of June 29, 1888 (25 Stats. 209), amended by section 8
of act of May 28, 1908 (35 Stats. 424-426) ; act of Congress of August
18, 1894 (28 Stats. 360); act of Congress of May 28, 1908 (35 Stats.
426); act of Congress of February 16, 1909 (35 Stats. 623); and act
of Congress of June 7, 1924 (Oil Pollution Act, 1924) :
   Operations and results during the fiscal year.-Notices to acquaint
navigation interests with the laws and regulations relating to the
harbor were issued with a view to obtaining cooperation in their
administration; dumping grounds for stone, ashes, mud, cellar dirt,
sewerage sludge, and other refuse were designated; and 4,018 permits
were issued for the removal of approximately 16,581,164 cubic yards
of material.
   Soundings were taken at frequent intervals over the designated
dumping areas to insure that sufficient depth of waters is maintained.
   Supervision was exercised by means of inspectors and patrols.
Three patrols are maintained--one at the mouth of the harbor to col-
lect permits and observe conditions of loading; one to insure that no
material is deposited at places other than the designated dumping
grounds and to keep the main channels free of any interference to the
safe navigation of these channels by deep-draft vessels; and one along
the water front to prevent the discharge into navigable waters of
waste oil and sludge, rubbish, and waste resulting from loading opera-
tions. The amounts of material reported to have been removed are
constantly checked by the patrols.
  The patrol boat at the mouth of the harbor was used in enforcing
regulations for a restricted area in the waters southeasterly from
                SUPERVISION OF THE HARBOR OF NEW YORK                                                1765
Sandy Hook, N. J. to permit the testing of war material without
interruption from or damage to shipping.
   In addition to the above patrols, five launches were used in patrol-
ling Staten Island Kills, Newark Bay, Raritan Bay, Passaic and
Hackensack Rivers, Sheepshead Bay, Jamaica Bay, the north shore
of Long Island, and along the shores of Westchester and Connecticut,
and various shallow tributaries.

                                           FLOATING PLANT

  There has been no change in the force of patrol boats engaged in
keeping up the necessary inspections during the past fiscal year.
Actions to end of fiscal year 1937 for violations of act of June 29, 1888,                         and its
                                   amendments
Number of cases reported to United States attorneys for prosecution:
   Prior to fiscal year 1937---------                 -------------------------                        911
   During fiscal year 1937---------------------------------------                                       58

        Total          ----------------------------------------                                        969

Number of convictions obtained or cases settled by compromise:
   Prior to fiscal year 1937  ---------------      --------------------                                656
   During fiscal year 1937-------------------------------------                                         24

        Total-------------                                                                             6----------------------

Number of cases nolle prossed or discontinued:
   Prior to fiscal year 1937------------------------------------                                       187
   During fiscal year 1937--------------14

        Total          --------------------------------------------------                              201
Number of cases dismissed after trial:
   Prior to fiscal year 1937  --------------------------------------                                     18
     During fiscal year 1937-                                                                             0

        Total-------               --------------------------------------------                          18
Number of cases pending June 30, 1937---- ----                          ---------------------            70

       Grand total            ----------------------------------------------                           969
   The cost of operating the vessels and the work of the office for the
year was $238,928.63.
  Proposed operations.-(a) The unexpended balance plus accounts
receivable June 30, 1937, amounting to $225,000 for maintenance and
routine operations will be expended as follows:
Salaries and wages---------------------------------------$130,                                          000
Fuel (coal, oil, gasoline)- ----------------------------------                                      23, 000
Subsistence of crews__           _       ---------------------------------                          19, 500
Docking and repairs----------------------------------------                                         37, 000
Supplies, general     ---------------------------------------------                                  9, 000
Wharfage and office rent--------------------------------------4,                                        000
Miscellaneous expenses__----_____________-                                                           2, 500
        Total---__                                                                         -----   225, 000
  (b) The approximate date when it is estimated funds will be
exhausted is June 30, 1938.
1766               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   (c) The amount which can be profitably expended for the service
for the fiscal year ending June 30, 1939, is $225,000, distributed as
follows :
Salaries and wages--------------------------          --------------                                             $130, 000
Fuel (coal, oil, gasoline) -----------------------                -  -                                             25, 000
Subsistence of crews-- -----------------------------                                                               19, 500
Docking and repairs------------------------------------------------                                                35, 000
Supplies, general---------------------------------                                                                  9, 000
Wharfage and office rent---------------------------------------                                                     3, 500
Miscellaneous expenses-------------- ---                                                                            3, 000

             Total---__---                    -------------------------------------                               225,000
                                              Cost and fnancial summary
Total cost of permanent work to June 30, 1937--------------- $5, 348, 072. 77
Undistributed costs June 30, 1937________ ________-------342,          277. 16
      Net total cost to June 30, 1937------------------------- 5, 690, 349. 93
Minus accounts payable June 30, 1937---------------4,                  985. 96
      Net total expenditures------------------------------5, 685, 363.97
Unexpended balance June 30, 1937________
                                 ---------                         13, 417.97
      Total amount appropriated to June 30, 1937-------------- 5, 698, 781. 94

    Fiscal year ending June 30                   1933             1934                1935           1936          1937


Cost of new work ...............
                   e                                 ......              2. 30.323.3...
Cost of maintenance.......-----------......   $323, 143. 45   $154, 102. 33      $170,932.31     $172, 315. 61   $218, 684. 83
        Total cost---------------              323,143.45       154,102.33        170, 932.31     172, 315.61     218, 684.83
Total expended_.----------------               323, 143. 45     154, 102. 33      170, 932. 31    172, 315. 61    218, 684. 83

Allotted.........---------------------         251, 247. 18    330, 190. 21       190, 000. 00    182, 000. 00     22, 800. 00


Balance unexpended July 1, 1936-------------------------------$209,          302. 80
Amount allotted from War Department Appropriation Act approved
  May 15, 1936-------------------------_                                 22, 800. 00
      Amount to be accounted for _______________________--__            232, 102. 80
Gross amount expended-------------------------$218, 696. 33
Less receipts from sales----------------------------             11. 50
                                                                        218, 684. 83
      Balance unexpended June 30, 1937--------------------               13, 417.97
Outstanding liabilities June 30, 1937---------------------------          5, 622. 33
      Balance available June 30, 1937--------------------------           7, 795. 64
Accounts receivable June 30, 1937--------_____
      Unobligated balance available June 30, 1937----------------         7, 795. 64
Amount that can be profitably expended in fiscal year ending June
                                - - - - -- - - -- - -- - -- - - -- - -- - -- - --
30, 1939, for maintenance _______                                                225, 000. 00
    1 Exclusive of available funds.

ANACOSTIA PARK AND THE RECLAMATION AND DEVELOPMENT OF
ANACOSTIA RIVER AND FLATS FROM THE MOUTH OF THE RIVER
TO THE DISTRICT LINE, DISTRICT OF COLUMBIA

  District engineer: Maj. R. G. Guyer, Corps of Engineers, to Octo-
ber 29, 1936; First Lt. W. J. Matteson, Corps of Engineers, to Feb-
ruary 10, 1937; Maj. W. D. Luplow, Corps of Engineers, since that
date.
  Location.-The Anacostia River enters the Potomac River at Wash-
ington, D. C.
                            ANACOSTIA PARK                       1767
   Previous projects.-Forthe part of the project below the Anacostia
Bridge, which is also a river and harbor improvement, see Annual
Report of the Chief of Engineers for 1919, page 553, under heading
"Existing project." For a description of the previous projects for
the improvement extending upstream from the Anacostia Bridge see
Annual Report of the Chief of Engineers for 1923, page 1990, under
heading "Existing project."
   Existing project.-This provides for the improvement of the river
and for the reclamation and development'of the adjacent flats from
the mouth of the river upstream to the District of Columbia bound-
ary line, a distance of about 61/3 miles, to afford a river channel 15
feet deep in the section between Anacostia Bridge and Massachusetts
Avenue, 9 feet deep thence to Benning Road. The section from the
mouth upstream to the Anacostia Bridge was dredged to a depth of
20 feet under a river and harbor project. The dredged material is
to be used for fills.
   The project includes a constant-level lake or lateral basin on the
west side of the river, to be known as Lake Kingman, and a smaller
lake on the east side of the stream. The normal surface elevation of
the lakes is to be 2 feet above mean low tide, and they are to be
dredged to a depth of 6 feet. A culvert or small bridge is to be con-
structed over Lake Kingman on the line of Benning Road, and a
lock and bridge is to be built at the lower end of Lake Kingman.
Influent and effluent gate-control works are to be provided to main-
tain a constant level in both lakes.
   Masonry sea walls on a riprap substructure are to be constructed
along the tidal channel of the river to extend 6 feet above mean low
water; the walls of the lakes are to extend 3 feet above mean low
water or 1 foot above the level of the lake.
   A portion of the reclaimed tract is to be set aside for development
by the Agricultural Department for a national arboretum and bo-
tanical garden. A strip of water-front land on the right bank of the
river between the Anacostia Bridge and the Pennsylvania Railroad
freight bridge is to be set aside for commercial purposes. The
bridges at Benning Road over the main channel are not to be altered.
The estimated cost of the project is $4,125,000 (October 1923). To
this must be added $150,000 appropriated by act approved July 3,
1930, for cost of land not covered in estimated cost of project be-
cause of subsequent adverse court decision as to United States owner-
ship.
   The acts of Congress authorizing and defining the present plan of
improvement are as follows:
   District of Columbia appropriation acts approved March 2, 1911
 (36 Stats. 1005); July 2, 1914 (38 Stats. 549); March 3, 1917 (39
Stats. 1040); March 3, 1915' (38 Stats. 923); August 31, 1918 (40
Stats. 950); July 11, 1919 (41 Stats. 99); June 5, 1920 (41 Stats.
954); February 28, 1923 (42 Stats. 1364); June 7, 1924 (43 Stats.
572); March 3, 1925 (43 Stats. 1246); May 10, 1926 (44 Stats. 448);
March 2,1927 (44 Stats. 1328); February 25, 1929 (45 Stats. 1295);
July 3, 1930 (46 Stats. 986); February 23, 1931 (46 Stats. 1410);
June 29, 1932 (47 Stats. 376); June 14, 1935; and June 23, 1936.
   The latest published map is found in Annual Report of Chief of
Engineers, 1924, at page 1994.
     20196-37--pt. 1--112
1768               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  Local cooperation.-The funds for:this project have been appropri-
ated by the District of Columbia appropriation bills, which, through
the fiscal year ended June 30, 1920, provided for half of the expense
to be borne by the,. District of Columbia. From that date to June 30,
1924, the expense was borne 60 percent by the District of Columbia
and 40 percent by the United States. Beginning July 1, 1924, the
District of Columbia paid all required above the lump sum appro-
priated from United States revenues.
   Operations and results during fiscal year.-U. S. derrick
boat Benning was engaged from September 16 to October 2, 1936,
dredging 1,900 linear feet of trench for sea-wall foundations. A
total of 6,013.78 tons of riprap stone was purchased and deposited
for sea-wall foundations. The total cost of sea-wall-foundation work
was $19,584.47. Construction of 1,520 linear feet of masonry sea wall
was in progress from April 13 to June 30, 1937, at a cost of $20,399.56.
Supervision of the placing of 50,187 cubic yards of select material in
dump fills was carried on throughout the year at a cost of $1,488.82.
The U. S. derrick boat Benning, at intervals during the year, was
engaged in dredging and placing 8,698 cubic yards of material behind
the sea wall at a cost of $2,170.43. Miscellaneous surveys were han-
dled during the year at a cost of $467.33. The total cost for the year
was $44,110.61, all applied to new work and expenditures were
$32,783.09.
   Condition at end of fiscal year.-The table below indicates the work
accomplished and expenditures therefor on the project to June 30,
1937. The project is 83.4 percent completed.
  The controlling depth below Anacostia Bridge in April 1936 was
18.4 feet, with a width of 300 feet; between Anacostia Bridge and
Pennsylvania Avenue Bridge in December 1934 it was 14 feet, with a
width of 400 feet; between Pennsylvania Avenue Bridge and Penn-
sylvania Railroad Bridge in December 1929 it was 16 feet, with a
width of 400 feet, between the Pennsylvania Railroad Bridge and Ben-
ning Bridge in August 1932 it was 6 feet, with a width of 100 feet;
between the Benning Bridge and the District line in May 1933 it was
5 feet, with a width of 100 feet; and in Lake Kingman the controlling
depth was 5 feet at mean low water.
                         Itemized statement of cost and work to June 30, 1937

                                                         Item                                                     Work accom-                  Cost
                                                                                                                    plished

                                                      ___________..... ..
Study and investigation_..................................                                                                                    $31, 180. 23
Reclamation:
     (a) Dredging--- _-------_            _.-____-_______                              ____cubic yards__               11, 265, 760          1, 390, 581.09
     (b) Dump fills...----------------------------------------------                                                       .....-------------- 43, 714. 05
Sea walls:
    (a) Channel-foundations.....-------------------------linear feet__                                                        40, 828         557, 178. 08
    (b) Channel-masonry.                 -------------------- -- do -                                                         31, 318         378, 733.03
   (c) Lake and islands-foundations --.               -------                  do -                                           29, 094         343, 212. 75
   (d) Lake and islands-masonry --------                  ------------------ do                                               16, 068         100, 054. 82
Land....   ..........     ...------------------------------------------------- acres                                         396, 119         458, 718.97
Allen Bridge .. _---------..                . -- ... -          . -------   ---------------------                -
                                                                                                              -I....------    ------.          81, 503.91
Plant and repair yard.........----------.....----------------------------   ------------------                                                  (1)
Lock, bridge, and influents ......                                           ...
                                                         ...----------------------------------.                                                87, 370.93
                                                                             . ___..
Effluent house and connecting cable .__________________________________________I            .                                                  27, 700. 78
Contingencies....                                        ------------       ---------------         ----------------------                     62--------------
                                                                                                                                               62, 708. 48
Engineering and clerical expenses....------------------.........                                              --------------                    (1)
Miscellaneous surveys_- . . . _.___
                                ..    .      ..............-
                                                       __-...                                         . -__ ... ..     --                        2850. 39
        Total cost....................-................-.....                                             -              -        --    -   3, 563, 507. 51

  1 Cost under these items included in totals for the other items.
  2To  be distributed to above items.
                                                    ANACOSTIA PARK                                                         1769

  Proposed operations.-The funds unexpended July 1, 1937, $58,-
898.12, and the sum of $50,000, included in Appropriation Act for the
District of Columbia for the fiscal year 1938, will be applied as
follows :
Accounts payable------       --------------------------------     $17, 336.21
New work :
    Masonry sea-wall construction with United States plant, navi-
      gation channel, sec. G (July-October 1937) --------------    48, 600. 00
    Purchase and condemnation of land----------------------        40, 000. 00
Supervision of dump fills------------------------------------       2, 000.00
Miscellaneous surveys    ----------------------------------------      961. 91

                                                                                                                     108, 898. 12
  The sum of $250,000 can be profitably expended during the fiscal
year 1939, as follows:
Dredging (March-June 1939) -------- ---------------------------- $34, 000
Trenching and levee construction (July 1938-June 1939) ------------                                                      10, 000
Labor gang on levees, etc. (July 1938-June 1939) -------------------                                                      3, 000
Supervision of dump fills (July 1938-June 1939) -------------------                                                       3, 000
Sea-wall foundations (July-October 1938)    --------------------------                                                   40, 000
Masonry sea wall (July-November 1938 and March-June 1939) ------                                                        100, 000
Influent and effluent conduits (April-June 1939) _-- --------- --------                                                  60, 000

                                                                                                                        250, 000
  It is proposed to do the work with Government plant and hired
labor and to purchase under contract the riprap stone for the sea-wall
foundations.
                                                Cost and financial summary
Total cost of permanent work to June 30, 1937---------------$3, 563, 507. 51
Undistributed costs June 30, 1937-----------------------------    7, 820. 70

      Net total cost to June 30, 1937----------- --------------- 3, 571, 328. 21
Minus accounts payable June 30, 1937-------------------------        17, 336. 21

     Net total expenditures--------- -----------                                              --------          3, 553,992.00
Unexpended balance June 30, 193711111111111111_                                                                     58, 898. 12

Total amount appropriated to June 30, 1937                                                                      3, 612, 890. 12

    Fiscal year ending June 30                     1933
                                                   1933           1934                 1935             1936             1937


Cost of new work      .---------...........--   $104, 544.03    $39, 741. 84       $19, 007. 04       $73, 958. 33      $44, 110. 61
Cost of maintenance----........--------------
      Total cost..            ....                104, 544.03
                                           _---------            39, 741.84          19, 007. 04       73, 958. 33       44, 110. 61
Total expended..-__-............                  95, 472. 40    44, 895. 74         11, 779. 79       77, 778. 57       32, 783. 09

Allotted----..............----------........-5,171.10J          -1,337.27      .-------------......    40,000.00         50,000.00



Balance unexpended July 1, 1936_------__      ________
                                          -____          ____                                                        $41, 681.21
Amount allotted from District of Columbia Appropriation Act
  approved June 23, 1936----------------------------   --     -                                                       50, 000. 00
      Amount to be accounted for--------__   --   ----- _____                                                         91, 681. 21
Gross amount expended ____      -_____-________-__$33, 333. 09
Less reimbursements collected--------    - -    -  - 550. 00
                                                                                                                      32, 783.09
      Balance unexpended June 30, 1937_______--- __-----__                                                            58, 898. 12
Outstanding liabilities June 30, 1937---_________---______-_                                                          57, 336. 21
         Balance available June 30, 1937_____ __                                           _____-----_                 1, 561. 91
1770       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Accounts receivable June 30, 1937-----------------------    --   ------------

       Unobligated balance available June 30, 1937 ___-1,               561.91

Amount (estimated) required to be appropriated for completion
of existing project 1-------------------------------------         662, 109. 88
Amount that can be profitably expended in fiscal year ending
June 30, 1939 for new work 1-------------------------------        250, 000. 00
  1 Exclusive of available funds.
   MAINTENANCE AND REPAIR OF THE WASHINGTON AQUEDUCT
   District engineer: Maj. R. G. Guyer, Corps of Engineers, to Octo-
ber 29, 1936; First Lt. W. J. Matteson, Corps of Engineers, to Febru-
ary 10, 1937; Maj. W. D. Luplow, Corps of Engineers, since that date.
   Location.--The intake for the water supply is on the Potomac
River at Great Falls, Md., 9 miles west of Washington, D. C. The
two filtration plants, all storage reservoirs, and other features are
located in the District of Columbia. (See U. S. geological quad-
rangle, Washington and vicinity.)
   The control of the system was vested in the Chief of Engineers by
the act of March 2, 1867, and section 1800, Revised Statutes.
   Existing project.-The existing project provides for the construc-
tion of various items of the system as authorized from time to time,
and the care, maintenance, and operation of the system up to the
point where the purified water is delivered to the District of Colum-
bia distributing system, and also for the care and maintenance of
the Conduit Road, McMillan Park, and the meters on the various
Government services.
   The electrification of McMillan filtration plant pumping station to
replace obsolete steam-driven machinery was authorized by Second
Deficiency Appropriation Act, fiscal year 1935, August 12, 1935, for a
total estimated cost of $150,000.
    A description of the system and of previous projects for construc-
tion and maintenance is printed at pages 2206-2208 and 2218-2220,
Annual Report of the Chief of Engineers for 1930.
   Local cooperation.-Up to the end of June 30, 1916, the expenses
of the Washington Aqueduct were paid one-half by the District of
Columbia and one-half by the United States, since which time they
have been paid wholly out of the revenues of the water department
of the District of Columbia.
    For the construction item "Increasing water supply, District of
Columbia", beginning with June 10, 1920, $25,000 was appropriated,
wholly out of the revenues of the United States, $3,200,000 out of
revenues payable, 60 percent by the District of Columbia and 40
percent by the United States, and of the balance after June 30, 1924,
the District of Columbia paid all required above lump sum appro-
priated from United States revenues.
    Operations and results during fiscal year.-An uninterrupted and
adequate supply of purified water was furnished to the District of
Columbia and Arlington County, Va. The average turbidity was
reduced from 179 to 0.32 and the bacterial content from 4,658 to 4.5
per milliliter. The average daily consumption was 100,361,000 gal-
lons, and the maximum was 142,420,000 gallons, making the average
per capita consumption in the District of Columbia 162 gallons per
day. The average daily consumption of water in Government build-
ings was 13,527,461 gallons, or approximately 13.5 percent of the
                                               WASHINGTON AQUEDUCT                                                                      1771

total. Over 60,000 tubes of water from various points in the system
were examined for bacterium colon, and after sterilization the aver-
age number of bacterium colon per 100 milliliters was found to be
0.027. Average alkalinity of the filtered water was 57; average pH
value was 7.5; and average hardness was 90. The cost of water de-
livered to the water department for distribution to consumers was
$43.11 per million gallons, as compared with $43.21 in 1.936.
   Work under contract for replacing the old steam-pumping equip-
ment of the McMillan filter plant was practically completed at the
close of the fiscal year 1937.
   The total cost under the appropriation for the fiscal year, including
accrued liabilities, was $476,504.98.
   The distribution of cost was as follows:
                                                                                                                                     Cost per
                                                                                                                     Total           million
                                                                                                                                     gallons


Collecting system .........--       -           --   -------           ---           --.....$62,282.                         39             $1. 70
Purification system--.              ..      ......------------------------------....        238,552.                         36              6. 51
Pumping system---             -----------------------------------          -------------    165, 755.                        60              4.53
Distribution system------------------                        ----------------------------     9, 914.                        63               .27

        Total..--------...-----------------------------------------476,504.98                                                               13. 01


   Condition at end of fiscal year.-All reservoirs, conduits, filter
plants, pumping stations, mechanical equipment, and structures were
in good condition, with the exception of the new conduit near Great
Falls, the tailrace from the hydroelectric plant, both damaged by
floods, the Dalecarlia filter strainers, the chemical feed apparatus, the
shops and storehouses, the pumping equipment at the shafts on the
city water tunnel, and insufficient pump capacity on the second high
service at Dalecarlia.
                                     Financial summary as of June 30, 1937

                                                                                                            Unexpend-
             Washington water supply                                Appropriated          R       ted to      ed (less  Cost to June
                                                                                              Treasury      and receiv-   30 137
                                                                                                               ables)


Total to June 30, 1936 ..  ---------...............---------      1$30,601,218.41          $407, 918. 04     $32, 561.04      $30,160, 739.33
Act of June 23, 1936----.........-------------------....                  470, 000. 00   --------------        4, 344.44          465, 655. 56
     Total ..                                                           31, 071, 218. 41 407, 918. 04
                                                             .----------------------------                    36, 905.48          30, 626, 394 89
Encumbered---                          -------------------------------------------------                                               36, 905. 48

  1 Includes a National Industrial Recovery Administration allotment of $16,944.17.

                                                       Division of expenditure8

                                                                                    Paid by-

                        Units                                                                                                       Total
                                                           United States            District of       Water depart-
                                                                                    Columbia             ment


Total   construction-----------------                $10, 965, 377. 11     $9, 109, 312. 82            $2, 147, 570. 70       $22,222,260.   63
Total   maintenance ------------------                  1, 239, 260. 89        955, 473. 18             5, 967, 053. 59         8, 161, 787. 66
Total   spring-water supply _-_--.                         223, 621. 81 ---                                                        223, 621. 81
Total   deferred charges ___-----------------------------_-                                                   18,724.79             18, 724. 79
        Total_                                 ...-.         12, 428, 259. 81      10,064, 786. 00         8, 133, 349. 08        30, 626, 394. 89
1772      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

                             PROPOSED OPERATIONS

   (a) Funds appropriated for the fiscal year ending: June 30, 1938,
by the District of Columbia Appropriation Act approved June 29,
1937, will be used as follows:
   For operation, including salaries of all necessary employees, maintenance, and
repair of Washington aqueducts and their accessories, including Dalecarlia,
Georgetown, McMillan Park, First and Second High Service Reservoirs, Wash-
ington aqueduct tunnel, the filtration plants, the pumping plants, and the plant
for the preliminary treatment of the water supply; ordinary repairs, grading,
opening ditches, and other maintenance of Conduit Road; purchase, instaflation,
and maintenance of water meters on Federal services; purchase; care, repair,
and operation of vehicles, including the purchase and exchange of one passenger-
carrying motor vehicle at a cost not to exceed $650; purchase and repair of rubber
boots and protective apparel, and for each and every purpose connected there-
with $540,000, including $40,000 for emergency repairs caused by the floods of
the Potomac River in March 1936 and April 1937.
   (b) The amounts which can be profitably expended during the
fiscal year ending June 30, 1939 (estimated), are as follows:
  For operation, including salaries of all necessary employees, maintenance, and
repair of Washington aqueducts and their accessories, including Dalecaria,
Georgetown, McMillan Park, First and Second High Service Reservoirs, Wash-
ington aqueduct tunnel, the filtration plants, the pumping plants, and the plant
for the preliminary treatment of the water supply; ordinary repairs, grading,
opening ditches, and other maintenance of Conduit Road; purchase, installation,
and maintenance of water meters on Federal services; purchase, care, repair, and
operation of vehicles including the purchase and exchange of one passenger-
carrying motor vehicle at a cost not to exceed $650; purchase and repair of rubber
boots and protective apparel, and for each and every purpose connected there-
with, $500,000.
   For chemical feed improvements at Dalecarlia and McMillan, one new second
high service pump, new pumps for city water tunnel shafts, new shop and store-
house building at Dalecarlia, housing for hydroelectric plant screens, and report
on increase of water supply for District of Columbia and Arlington County, Vir-
ginia, and for each and every purpose connected therewith, $200,000.

           Washington Aqueduct, District of Columbia, Maintenance
                                       1935
July 1, 1936, balance unexpended _________________ --                     2, 229. 91
June 30, 1937, additional amount authorized to meet 5-percent pay
  restoration-------__  --------------------------------------               255. 75
June 30, 1937, amount expended during fiscal year

       June 30, 1937, balance carried to surplus fund_---         --       2, 485. 66
                                  1936
July 1, 1936, balance unexpended---------------------------     201, 145. 08
Reallotted from Washington aqueduct, District of Columbia, 1936
  to Washington aqueduct, 1936-37-------------------  -------- 150, 000.00

       Amount to be accounted for_ .. ____       ______--__--_
                                                    --                    51, 145. 08

June 30, 1937, gross amount expended during fiscal year_ $53, 950. 01
Less reimbursements------      .----- __--   - --      _-___-2, 804. 93
                                                                          51, 145. 08
June 30, 1937, net amount expended during fiscal year_____________        48, 709. 56

      June 30, 1937, balance unexpended______________________              2, 435. 52
June 30, 1937, outstanding liabilities---------------------------          1, 571. 00

       June 30, 1937, unobligated balance available---------------           864. 52
                           BEACH EROSION BOARD                                     1773
                                      1936-37
Amount appropriated by act approved June 22, 1936------------$150, 000. 00
June 30, 1937, amount expended during fiscal year_-------__ --_ 122, 117. 59

      June 30, 1937, balance unexpended____________________ __ 27, 882. 41
June 30, 1937, outstanding liabilities  _____________________4, 397. 41

                                                                           23, 485. 00
      June 30, 1937, amount covered by uncompleted contracts----           23, 485. 00

June 30, 1937, balance available_ _-___-_____       ________-- ____-                   0. 00
June 30, 1937, accounts receivable__----__---        ------         ---
                                                               ______            -0.      00

      June 30, 1937, unobligated balance available -------------__                     0. 00

                                    1937
Amount appropriated by act approved June 23, 1936--------------- 470, 000. 00
Received from special deposits----___--------__________               800. 00

                                                                         470, 800. 00
June 30, 1937, amount expended during fiscal year ___________          _ 444, 177. 07

      June 30, 1937, balance unexpended_______________________             26, 622. 93
June 30, 1937, outstanding liabilities___ --------------    __-            35, 123. 92

      June 30, 1937, balance available----      --------------            -8,      500.99
June 30, 1937, accounts receivable-________________   __________                8, 500. 99
      June 30, 1937, unobligated balance available__-__- ____
                                                          ---                          0. 00
               Booster Pumping Plant, DalecarliaReservoir, D. C.
                                      1936
July 1, 1936, balance unexpended _______________________$2,                       377. 86
June 30, 1937, amount expended during fiscal year--         ________              702. 92
      June 30, 1937, balance unexpended ___-          ---       --
                                                               _______     1, 674.94
June 30, 1937, outstanding liabilities ____--          -___________--  -__ 1, 674. 08
                                                                                        . 86
June 30, 1937, amount covered by uncompleted contracts

      June 30, 1937, unobligated balance available-------------____                     .86
                 Increasing Water Supply, District of Columbia
Total amount appropriated to June 30, 1937 _______________$8, 725, 100. 00
Total amount expended to June 30, 1937 .---- -__-__-__- ____ 8, 722, 961.33
      July 1, 1936, balance unexpended---______      _______--                  2, 138.67
June 30, 1937, outstanding liabilities---------------------------               2, 000. 00
      June 30, 1937, unobligated balance available___-----_____                   138. 67
                           BEACH EROSION BOARD
  Section 2, River and Harbor Act approved July 3, 1930 (Public
No. 520, 71st Cong.) authorized and directed the Chief of Engineers,
United States Army, under the direction of the Secretary of War, to
cause investigations and studies to be made in cooperation with the
appropriate agencies of various States on the Atlantic, Pacific, and
Gulf coasts and on the Great Lakes, and the Territories, with a view
to devising effective means of preventing erosion of the shores of the
coastal and lake waters by waves and currents. The act provided for
1774    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

the organization of a board of seven members of whom four members
are officers of the Corps of Engineers and three are selected from
among the State agencies cooperating with the War Department.
The Board has been designated the Beach Erosion Board.
   The act approved June 26, 1936 (Public, No. 834, 74th Cong.) in-
creased the scope of the investigations and studies made by the Board.
This law provides that it shall be the duty of the Secretary of War,
through the'Beach Erosion Board, "to make investigations with a
view to determine the most suitable methods of beach protection and
restoration of beaches in different localities; to advise the States,
counties, municipalities, or individuals of the appropriate locations
for recreational facilities; and to publish from time to time such
useful data and information concerning the protection of beaches as
the Board may deem to be of value to the people of the United
States." The law further provides that the Board in making "its
report on any work or project relating to shore protection shall, in
addition to any other matters upon which it may be required to re-
port, state its opinion as to (a) the advisability of adopting the
project, (b) what Federal interest, if any, is involved in the proposed
improvement, and (c) what share of the expense, if any, shall be
borne by the United States."
   The Beach Erosion Board consists of the following members: Col.
Earl I. Brown, senior member; Col. Elliott J. Dent; Col. Edmund L.
Daley, appointed in Special Order 90, September 14, 1936, vice Lt. Col.
Brehon Somervell, relieved; Maj. Charles H. Cunningham; Richard
K. Hale, associate commissioner, department of public works, Boston,
Mass.; Victor Gelineau, director and chief engineer, board of commerce
and navigation, State of New Jersey; Thorndike Saville, consulting
engineer, department of conservation and development, State of North
Carolina.
   By authority of the Secretary of War, a board of officers of the
Corps of Engineers, known as the Shore Protection Board, was cre-
ated by Special Order 72, paragraph 2, Office of Chief of Engineers,
September 18, 1930. The membership of this Board consists of the
same officers as those on the Beach Erosion Board, and the office
personnel is the same for both Boards.
    The River and Harbor Act of August 30, 1935, paragraph 5, re-
quires that every report submitted to Congress in pursuance of any
provision of law for preliminary examination and survey looking
to the improvement of the entrance at the mouth of any river or at
any inlet, in addition to other information which the Congress has
directed shall be given, shall contain information concerning the con-
figuration of the shore line and the probable effect thereon that may
be expected to result from the improvement having particular refer-
ence to erosion and/or accretion for a distance of not less than 10
miles on either side of the sand entrance. By direction of the Chief
of Engineers, all investigations made in accordance with the above
section of the River and Harbor Act are referred by the division engi-
neers directly to the Shore Protection Board for a report.
    During the fiscal year ending June 30, 1936, the following cooper-
ative studies were completed: Grand Isle, La., August 25, 1936; Blind
Pass, Fla., February 17, 1937; Miami Beach, Fla., February 17, 1937;
Hollywood Beach, Fla., April 17, 1937.
                    NORTHERN AND NORTHWESTERN LAKES                                                  1775
  In addition to the cooperative studies, the following Federal studies
were made by the Shore Protection Board, under the provisions of the
River and Harbor Act of August 30, 1935; Indian River Inlet, Del.,
September 3, 1936; Fort Sanilac Harbor, Mich., September 23, 1936;
Absecon Inlet, N. J., October 12, 1936; Fire Island Inlet, Long Island,
N. Y., February 19, 1937; Jones Inlet, Long Island, N. Y., March 5,
1937; Stamford Harbor, Conn., April 30, 1937; Back Sound, N. C.,
May 1, 1937; Calcasieu Pass, La., April 30, 1937; Drum Inlet, N. C.,
June 24, 1937.
  The Beach Erosion Board has cooperative investigations in prog-
ress at the following localities: Daytona Beach, Fla.; Salisbury
Beach, Mass.; Pelham Bay (Orchard Beach) Bronx, N. Y.; Long
Island State Park beaches, New York; North Carolina State; Ala-
mitos Bay, Calif.; Palm Beach, Fla.; Santa Barbara, Calif.; Wil-
loughby Spit, Va.; Coronado Beach, Calif.; Orange County (New-
port Beach), Calif.
   The work accomplished by the Boards, since organization and the
status of operation at the close of the fiscal year, is shown by the
following table:
                                                                   Ordered     With-       Com-     Remain-
                    Character of investigation                      or re-     drawn       pleted     ing
                                                                   quested


                               --
                         ,
Cooperative studies.. ...........----......--.. .....      .....        28             2       15         11
Federal studies---------      ----------------------------------        41   ---               38          3
Experimental studies_-- ------------------------------------            22         13           8          1



  Cost and financial summary.-Expenses incident to the operations
of the Boards are paid from funds appropriated for "Examinations,
surveys, and contingencies for rivers and harbors."
Total amount allotted to the Boards since organization---------- $100, 900. 21
Net expenses since organization, as of June 30, 1937 -- ______    141, 966. 69
     Balance unexpended as of June 30, 1937 ____-__-___-                                        18, 933. 52
Expenses of Boards for fiscal year 1937-------------------------                                28, 586. 06

          SURVEY        OF NORTHERN AND NORTHWESTERN LAKES
            [Conducted by the U. S. Lake Survey Office, Detroit, Mich.]
  District engineer: Col. C. R. Pettis, Corps of Engineers.
  Surveys-Great Lakes.-The existing general project, stated in
detail in the Annual Report for 1907, pages 844 to 850, comprises
the following work: Ascertainment and charting of depths in all
significant regions of the Great Lakes to a plane 30 feet below the
adopted low-water datum of the open lakes and 25 feet below the
corresponding datum in the channels of the connecting rivers, com-
pletion of triangulation and precise leveling needed to control the
areas under survey, river-discharge measurements, investigations of
lake levels, magnetic surveys in and near main vessel courses, and
prompt examination of areas where obstructions to navigation have
been reported.
  Surveys--New York State canals.-The Sundry Civil Act of
March 4, 1911, provided that the survey be extended to include the
1776    REPORT OF CHIEF OF ENGINEERS, U. S, ARMY, 1937

lakes and other natural navigable waters of the New York State
canals. The project contemplated revision and adjustment by field
reconnaissance of all existing survey data pertaining thereto, sup-
plemented by such additional topographic and hydrographic surveys
as might be required for the publication of navigation charts of
these waters. Field work under this project has been completed, and
the full set of charts has been published.
   Surveys-Lake Champlain.-The scope of operations was ex-
tended by the Sundry Civil Act of June 23, 1913, to include Lake
Champlain. Surveys of harbors and other important areas were
commenced during the field season of 1928. This work was com-
pleted in 1933.
   Surveys-Boundary waters between the Lake of the Woods and
Lake Superior.-The Sundry Civil Act of August 1, 1914, extended
the work of the Lake Survey to include these waters. The project
provides for the preparation of navigation charts of the American
waters of the Lake of the Woods and Rainy Lake, complete with
hydrography, and for the preparation of charts of the remainder of
the boundary waters without hydrographic detail, it being considered
that existing commerce does not warrant the preparation of com-
plete navigation charts except for the two lakes named.
   Charts.-The chart project, adopted April 17, 1909, provided for
revising old charts and preparing new ones. Further details con-
cerning it are printed on pages 1918-23 of the Annual Report of
the Chief of Engineers for 1917.
   The number now in force, including 5 charts of the Lake of the
Woods, 1 of Rainy Lake, 5 charts of Lake Champlain, 7 charts of
the New York State canals, and 108 charts of the Great Lakes, is
126. The number of charts necessary is not fixed. Changing re-
quirements of navigation may render new charts desirable or make
old charts unnecessary.
   Bulletins.-The work pertaining to the Bulletin of the Survey of
Northern and Northwestern Lakes consists in publishing annually
in April a revised volume of coast and harbor descriptions, etc., and
seven monthly supplements from May to November, giving changes
and additions.
   Investigation of lake levels.-The present program of field work
and office studies for essential hydraulic investigations of the Great
Lakes, approved January 21, 1935, embraces current meter work for
the revision of flow equations as necessary in the connecting and out-
flow rivers; field determinations and office studies pertaining to effects
of improvements, made or proposed, and of diversions at various
localities; compilations and studies relating to rainfall, run-off, evapo-
ration, water temperatures, ice retardation, earth tilt, and other phe-
nomena affecting the levels of the lakes; and the installation and
operation of gages to maintain records of water-surface elevations and
to adjust datum planes for river and harbor improvements.
   Estimated cost of the work.-The cost of maintenance work, which
includes revision and reissue of charts, revisory surveys of harbors,
and miscellaneous investigations of obstructions to navigation, obser-
vation and study of lake levels, publication of bulletins, supplements.
and notices to mariners, and other continuing necessary activities, is
estimated at $215,000 for the fiscal year 1938.
              NORTHERN AND NORTHWESTERN LAKES                     1777
              OPERATIONS AND RESULTS DURING THE YEAR

   Surveys.-Four parties were in the field on July 1, 1936, and opera-
tions were continued until November 12. Five parties were organized
in the spring of 1937, and field work was started on May 10, and has
been continued to the end of the fiscal year. Localities and character
of the work are as follows:
   St. Marys' River: A revisory survey of the St. Marys River was
completed.
   Lake Michigan: Sweeping along the Chicago water front was com-
pleted. Revisory surveys were made in Grand Traverse Bay and in
all of the harbors on the east side of the lake from Harbor Springs
to Grand Haven.
   Lake Erie: Revisory surveys of all of the harbors on Lake Erie in
United States territory were made, and the approaches to the harbors
at Huron, Lorain, Cleveland, and Fairport were swept and sounded.
The wreck of the Sand Merchant was found with the sweep and its
position located.
   Lake Ontario: Revisory surveys of all of the harbors on Lake
Ontario in United States territory were made.
   St. Lawrence River: The revisory survey of the St. Lawrence River
was completed from Clayton to Chippewa Bay, and in the vicinity
of the Rapids Plat and Waddington.
   Control surveys: A line of first order levels has been carried from
Lexington on Lake Huron south to Mount Clemens.
   Charts.-Duringthe year ending June 30, 1937, revised editions of
41 charts were prepared and issued. One new chart was published.
Due to the unprecedented demand, and to the extensive changes in
navigation channels, it was necessary to reprint 35 charts.
   The number of charts sold during the year by the Detroit office was
28,131, and by the Buffalo, New York City, and Albany offices, 3,614,
the aggregate sales being 31,745. The proceeds of sales, amounting
to $11,826.60, were deposited to the credit of the Treasurer of the
United States. The Detroit office issued 6,637 charts for official use;
and the Buffalo, New York City, and Albany offices, 496, a total of
7,133.
   Bulletin, etc.-The bulletins, which contain descriptions of coast
lines, harbors, channels, menaces to navigation, and other important
information supplementary to the charts, but of too voluminous a
character to be incorporated thereon, are issued free in connection
with the charts. They are distributed annually according to a care-
fully revised mailing list, and a stock of the current bulletin and the
supplements thereto is kept on hand for issue to chart purchasers.
The present edition of the bulletin is 2,400 copies. Supplements
Nos. 3 to 7, Bulletin No. 45, were issued between July and Novem-
ber 1936.
    Copy for Bulletin No. 46 was prepared during the winter and for-
warded to the Public Printer in February. The edition was received
in April. Supplements Nos. 1 and 2 were printed locally under con-
tract and were issued in May and June 1937.
    In addition to the publications mentioned above, mimeographed
notices of monthly stages of the Lakes were sent to newspapers, ves-
sel interests, and Government officials in the Lakes region.
1778                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

   Investigation of lake levels.-To record the fluctuating elevations
of the water surfaces, 15 self-registering gages and 4 staff gages on
the Great Lakes and connecting rivers were operated throughout
the year. Four self-registering gages were operated during the
navigation season only.
   Discharge measurements were made on the St. Lawrence and the
St. Clair Rivers to check possible changes in regimen. In connec-
tion with the diversion of water for power at Massena, N. Y., meas-
urements of the flow through the South Sault Rapids were made.
   A new rule for the regulation of Lake Superior was prepared.
A study of rainfall, run-off, and evaporation in relation to lake
stages has been in progress. Miscellaneous computations of the
effect upon lake levels of proposed and completed projects for the
improvement of navigation have been made.
   The total cost during the year was $220,790.48, all for mainte-
nance. The total expenditures during the year, after deducting
receipts from sales, were $200,985.41.
   Condition at end of fiscal year.-The present project for surveys
on the Great Lakes was formulated in 1907. The project work on
New York State canals, on Lake Champlain, and on Lake of the
Woods and Rainy Lake have been completed.
   Charts.-Lake survey charts are on sale at the lake survey office
at Detroit; at the canal office at Sault Ste. Marie, Mich.; and at the
United States Engineer offices in Buffalo,, Albany, and New York
City. Complete sample sets are on file at the United States engineer
offices at Duluth, Milwaukee, Chicago, and Cleveland, affording
additional facilities for examination and selection before placing
orders.
   From 1882 to June 30, 1937, a total sum of $178,245 was derived
from the sale of charts and deposited in the United States Treasury.
In all, 1,049,407 of these charts have been sold and issued for actual
service.
   Costs and expenditures under existing project.-It is impracticable
to determine separately the costs for new work and for maintenance
since the adoption of the existing project. The approximate com-
bined cost, found by deducting expenditures of $3,973,897.31 under
previous projects from the total cost of permanent work, is $3,935,-
535.87. The total expenditures under the existing project up to June
30, 1937, amount to $4,301,542.78.
Monthly means of water levels for stations named expressed in feet above mean
                              tide at New York
                                                                   [Adjusted levels of 1935]

                                                                                               1936


                                                            July        August       September        October     November       December

Marquette..........-------------------..                     602.76        602. 67      602. 70         602. 52      602.   27       601. 94
Milwaukee                      _..................           578. 65       578. 52      578. 56         578. 34      578.   02       577. 74
Harbor Beach__.-- --                       .-           -    578:.60       578. 41      578. 49         578. 46      578.   23       577. 79
Cleveland ............                        _-.. -_        571.11        570. 84      570. 65         570. 51      570.   27       570. 09
Oswego.           -.-........                  -.            244. 78       244. 24      243.99          243. 83      243.   77       243. 50
                         NORTHERN AND NORTHWESTERN LAKES                                                            1779
Monthly means of water levels for stations named expressed in feet above mean
                      tide at New York-Continued

                                                                         1937


                                    January       February       March             April              May           June

Marquette.___-------------.         -   601.85       601. 80       601. 74          601.   71          602.   22      602. 47
Milwaukee__ -        ------------       577. 77      577. 80       577. 90          578.   16          578.   49      578. 60
                     __
Harbor Beach ------------               577.84       577.85        577. 98          577.   98          578.   45      578. 63
Cleveland_-. -------------              570. 73      571. 27       571.27           571.   62          572.   20      572. 38
Oswego__---------------___-             243. 98      244. 66       244. 85          245.   01          245.   82      246. 04



  Proposed operations.-It is proposed to apply the balance of funds
unexpended on June 30, 1937, together with an additional allotment
of $190,000, as follows:
Accounts payable, June 30, 1937----------------------------- $6, 171. 38
Maintenance :
    Maintenance of gages on the Great Lakes and Rivers, and
      reduction of records----------------------------------                9, 000. 00
    Hydraulic studies, investigations and surveys, including dis-
      charge measurements in connecting rivers:
        Operation of Government launch ----                      , 000
                                                              $-----------
        Field and office work----     --------------------- 16, 000
                                                                           18, 000. 00
Revisory surveys:
    Operation of steamer and launches-----------------        44, 000
    Expenses of parties, field and office-----------------    42, 000
                                                                          86, 000. 00
Control surveys: Expenses of party, field and office------------ 7, 500. 00
Chart preparation, correction, issue, and sale---------------             85, 000. 00
Preparation of bulletin, preparation and publication of supplements_        3, 000. 00
Balance remaining__--------------          ------------                        111.19

         Total-          ---------------------------------------------                                         214, 782. 57
  The cost of operations will average about $19,000 per month prior
to November 1 and after May 15, while parties are in the field, and
about $16,000 per month during the remainder of the year. It is
expected that available funds will be exhausted by June 30, 1938.
  For utilizing existing organization and plant to the best advantage,
work estimated to cost $210,000 can be profitably carried on during
the fiscal year ending June 30, 1939, as follows:
Maintenance:
    Maintenance of gages and records________                                                                       $10, 000
    Hydraulic studies, investigations and surveys:
        Operation of Government launch _____- ___ -__--                                         -      $2,000
        Expenses of party, field and office-__                                                         1________
                                                                                                    __ 18, 000
                                                                                                               20, 000
Revisory surveys:
    Operation of steamer and launches-------------------44, 000
    Expenses of parties, field and office-------------------43, 000
                                                                       87, 000
Control surveys: Expenses of party, field and office----------------- 5, 000
Chart preparation, correction, issue, and sale     --------------------85, 000
Preparation of bulletin, preparation and publication of supplements_    3, 000
           Total----------------                    ----------------------------                                   210. 000
1780            REPORT OF CHIEF OF ENGINEERS, :U. S. ARMY, 1937

                                                Cost and financial summary
Total cost of permanent work to June 30, 1937_1111111___                                                  $8, 132, 223. 66
Undistributed costs June 30, 1937------__----------------------                                               149, 248. 37

      Net total cost to June 30, 1937------------                                              ___-----------8, 281, 472. 03
Plus accounts receivable June 30, 1937----                                                                                 10
                                                                                                                     1----------_____25.

     Gross total costs to June 30, 1937 ___--------      ______                                      __    8, 281, 597. 13
Minus accounts payable June 30, 1937--------------------------                                                  6, 171. 38

     Net total expenditures------------------------------ 8,275, 425. 75
Unexpended balance June 30, 1937--___________ ____________-24, 657. 47
          Total amount appropriated to June 30, 1937-------------8,                                            300, 083. 22

    Fiscal year ending June 30                     1933           1934           1935            1936               1937


Cost of new work------..          --------       $25,945. 20    $18, 328. 24   $32, 951. 79    $16, 684. 64
Cost of maintenance------..           ----.      159, 336. 87   161, 993. 07   186, 861. 55    194, 278. 36        $220,790.45

       Total cost.---------                --    185, 282. 07   180, 321. 31   219, 813. 34    210, 963. 00        220, 790. 48

Total expended      ......------------------.    168, 712.92    185, 639. 37   190, 209. 55    275, 616. 72        200, 985.41

Allotted--.---------------------                 170,000.00     204, 000.00    205, 000. 00    285, 500.00     .


Balance unexpended July 1, 1936-------- -------------------                                                   $225, 642. 88

Amount to be accounted for____________--
                                     ------------------                                                        225, 642. 88
Gross amount expended------------------------- $202, 552.39
Less-
    Reimbursements collected------------ $1,540. 81
    Receipts from sales--------------------   26. 17
                                                        1,566. 98
                                                                                                               200, 985. 41

      Balance unexpended June 30, 1937 -----------------------                                                  24, 657.47
Outstanding liabilities June 30, 1937----------------------   ----                                               6, 462. 84
     Balance available June 30, 1937 -------------------------                                                  18, 194. 63
Accounts receivable June 30, 1937-                                                                                  125. 10

          Unobligated balance available June 30, 1937--                                       ----               8, 319. 73
                                                                                                                1----

Amount that can be profitably expended in fiscal year ending June
30, 1939, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - -                               210, 000. 00
   1 Exclusive of available funds.

                                 INTERNATIONAL BOUNDARY WATERS

OPERATIONS OF THE INTERNATIONAL ST. CROIXeRIVER BOARD OF CONTROL

   Constitution, and duties.-The Board was organized in pursuance
to conditions in the orders of the International Joint Commission
approving the maintenance and operation of the dam built by the
St. Croix Water Power Co. and the Sprague Falls Manufacturing
Co., Ltd., across the St. Croix River at Grand Falls in the State
of Maine, and subsequent agreements reached between the two
Governments.
   The Board is charged with the duty of formulating and adminis-
tering rules under which the power plant and accessories are to be
operated to prevent as nearly as possible a level of water at the dam
higher than 203.5 (mean sea-level datum), and to secure to the users
                  INTERNATIONAL BOUNDARY WATERS                          1781
of water below Grand Falls the flow of water to which they are
entitled. The Board is also charged with the supervision of the
operation of all fishways on that portion of the St. Croix River that
forms the international boundary.
  On October 2, 1934, the International Joint Commission issued an
order approving the reconstruction of the dam, owned by Canadian
Cottons, Ltd., extending across the St. Croix River from Milltown
in the Province of New Brunswick, Canada, to Milltown in the State
of Maine, United States of America, which contained the following
conditions:
  1. That the reconstructed dam be so operated as to insure that the forebay
levels rise to no higher elevation than that which has heretofore obtained in
the operation of the dam now being replaced.
  2. That during times of flood the sluiceways of the dam shall be sufficiently
open to insure passage of the river flow.
  3. That the operation of the dam, insofar as is necessary to insure the
observance of the provisions of this order, be under the supervision of the
International St. Croix River Board of Control.
  The members of the Board are Mr. J. T. Johnston, controller,,
Dominion Water & Power Bureau, for Canada; and Lt. Col. A. K. B.
Lyman, Corps of Engineers, who relieved Lt. Col. Philip B. Fleming,
Corps of Engineers, on November 12, 1936, for the United States.
   Operations during the fiscal year.-Supervision was maintained
and inspections made to insure that the regulations of the Inter-
national Joint Commission were carried out.
  Proposed operations.-Only such correspondence and inspections
as may be necessary to carry out the regulations of the International
Joint Commission.
                     PRESERVATION    OF NIAGARA FALLS

   District engineer: Col. J. A. O'Connor, Corps of E.gineers.
   Division engineer: Col. L. V. Frazier, Corps of Engineers.
   In 1923 a board known as the Niagara Control Board was con-
stituted by the United States and Canada to measure and supervise
the diversion of water from the Niagara River on both sides of the
international boundary line. The members of the Board during the
fiscal year were Mr. J. T. Johnston and Dr. Charles Camsell for
Canada and Col. J. A. O'Connor, Corps of Engineers, and Dr.
Horace McFarland for the United States.
   Description.-The history, in brief, of operations in behalf of the
preservation of the scenic grandeur of the Falls and the rapids of
Niagara River may be found =by reference to the following sources:
   Annual reports of the Chief of Engineers and appendixes thereto:
Pages 1703 to 1705, report for 1915; pages 2067-2069, report for
1920; and pages 2104-2105; report for 1921; Report on Diversion of
Water From the Great Lakes and Niagara River, the War Depart-
ment, June 1921; Senate Document No. 128, Seventy-first Congress,
second session, containing report by the Niagara Control Board; and
a supplemental report on the fall of rock, which was submitted on
November 10, 1931.
   Operations during the fiscal year.-Records of water levels above
the Falls were obtained by means of four self-registering gages.
Records obtained from the Niagara Falls Power Co. furnished water
elevations in the gorge of Niagara River at station No. 3A. The
1782    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

Niagara Control Board received a complete hourly record of the
diversion at all power plants.
OPERATIONS OF THE BOARD OF CONTROL TO CONTROL THE OPERATION OF
  THE ST. LAWRENCE RIVER POWER CO.'S WORKS IN THE ST. LAWRENCE
  RIVER NEAR MESSENA, N. Y.

  An order of the International Joint Commission issued after a
hearing on the application of the St. Lawrence River Power Co.
for permission to continue to maintain the submerged rock weir
constructed by the company in the south Sault Channel of the St.
Lawrence River, authorized the maintenance of the weir and, among
other things, provided for a board of engineers to pass upon and
control the new and old works involved.
  The members of the Board for the fiscal year were Mr. J. T.
Johnston for Canada and Col. J. A. O'Connor, Corps of Engineers,
for the United States.
   Operations during the fiscal year.-The Board kept in touch with
conditions by means of inspections and with respect to the diversion
by means of monthly reports of the power company, showing the
amount of water diverted and power-house performance from day
to day.
                  LAKE SUPERIOR BOARD OF CONTROL

   The Board is charged with the supervision of the operations of all
compensating works and all power canals and accessories with a view
to maintaining the level of Lake Superior between elevations of 602.1
and 603.6 above mean tide at New York.
   The members of the Board for the fiscal year 1937 were Mr. J. T.
Johnston for Canada and Col. V. L. Peterson, Corps of Engineers,
for the United States.
   Operations during the fiscal year.-The Board kept in touch dur-
ing the year with conditions obtaining to the diversion, through repre-
sentatives of the United States and Canada on the ground, and by
means of regular and systematic reports of the water levels in Lake
Superior and in the channels above and below the Sault Locks, and
in Lake Huron. Records of discharge through the rapids, navigation
canals, and power plants at the Sault were also systematically reported
to the Board.
                     LAKE OF THE WOODS, M1INN.

   Location and description.-TheLake of the Woods is an irregularly
shaped body of water 1,485 square miles in area, lying partly in
northwestern Minnesota and partly in eastern Manitoba and western
Ontario, Canada. The southerly portion of the lake is an expanse
of relatively shallow open water about 30 miles wide, bordered on
the United States side in Minnesota by low and generally swampy
shores.
   Original condition.-The lake remained in its natural condition
until 1888, when the construction of the Rollerway Dam at one of
its outlets near Kenora, Ontario, had the effect of raising the natural
level of the lake an average of about 3 feet, which amount was re-
duced to about 1.5 feet between 1893 and 1898. Under the authority
of the government of Ontario, the Norman Dam was built in the
WVinnipeg River, about 1 mile below the Rollerway Dam, between
                  INTERNATIONAL BOUNDARY WATERS                            1783
1893 and 1895. It was placed in operation in 1898 and has had the
effect of raising the natural high-water level of the lake an average
of about 21/4 feet during the years from 1898 to date.
   Existing project.-The convention between the United States and:
Great Britain proclaimed July 17, 1925, provides for the regulation
of the level of the Lake of the Woods in order to secure to the in-
habitants of the United States and Canada the most advantageous;
use of the waters thereof and of the waters flowing into and from the,
lake on each side of the boundary between the two countries.
   The convention also provides for the establishment and mainte-
nance of a Canadian Lake of the Woods Control Board to regulate
and control the outflow of the waters of the lake, and for the estab-
lishment and maintenance of an International Lake of the Woods?
Control Board, composed of two engineers, one representing the
United States and the other representing Canada, to whose approval
the rate of total discharge shall be subject whenever the elevation
rises above elevation 1,061 or falls below elevation 1,056 sea-level
datum.
   The members of the international board during the fiscal year
were Maj. A. B. Jones, Corps of Engineers, for the United States,,
and Mr. J. T. Johnston, for the Dominion of Canada.
   Detailed operations prescribed by the convention and by an act of
Congress approved May 22, 1926, as amended by an act approved
April 18, 1928, are:
   (a) For the regulation of the lake in accordance with articles 1, 4, and 5, of
the treaty when the level is outside the limits specified above.
   (b) .. For the acquisition by purchase or condemnation of flowage easements
up to elevation 1,064, sea-level datum, upon all lands in the United States bor-
dering on the Lake of the Woods on the Warroad River, and on Rainy River,
all in the State of Minnesota.
   (c) For various protective works and measures as specified in article 8 of
the convention.
   (d) For investigation and report on all claims for damages caused to the
inhabitants of the United States by fluctuation of the levels of the Lake of
the Woods due to artificial obstructions in the outlets of said lake prior to the
acquisition of flowage easements.
   Operations and results during fiscal year.-All necessary work in
connection with the acquisition of the remaining easements was com-
pleted, and a final report was prepared and submitted, covering all
work performed under the project.
   The total number of past damage claims is 495. All reports on
these were submitted to the Chief of Engineers, in 1931, thus com-
pleting: that work.
  Lake levels were controlled in cooperation with the other members
of the International Lake of the Woods Control Board constituted
for the purpose. Contact was maintained with Canadian officials,
data gathered, and studies made for further action to be taken when
required.
  The costs of the work of the year were $5,324.23 for surveys and
investigation of easements, and $34,282.63 for the purchase of ease-
ments, totalling $39,606.86. The total expenditures were $40,157.45.
There were no costs or expenditures during the year on past damage-
claim work.
   Condition at end of fiscal year.-This project has been completed
with the obtaining of decrees in all cases.
1784           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1937

  The costs to the end of the fiscal year 1937 in connection with
protective works and measures and the procurement of flowage ease-
ments are as follows:
Protective works and measures_______---_____________________                                                    $157, 122. 59
Flowage easements-___---------------------------                                                                 579, 339. 29

      Total- ---                      ----                                                                            461. 88
                                                                                                                 736,,-----------------
The total expenditures were--------------------------------                                                      736,452. 63
                                       Cost and financial summary

PROTECTIVE WORKS AND                  MEASURES,       LAKE OF THE WOODS AND                          RAINY RIVER, MINN.

Total cost of permanent work to June 30, 1937_11111111    1 _1 $87, 866. 73
Minus accounts payable June 30, 1937---------------------------       9. 25

     Net total expenditures------------------- ----      _      87, 857. 48
Unexpended balance June 30, 1937---------    ------------------ 37, 142. 52
          Total amount appropriated to June 30, 1937_______________                                              125, 000.00

          Fiscal year ending June 30                    1933               1934           1935           1936             1937


Cost of new work__-----------------------
Cost ofmaintenance.
                                                         ------------------
                                         ........ ........ ----------
                                                    -- --. ...  .
                                                                    .._ $48, 259.87 $3if, 6(.'86
                                                                        _ -----.-----------
       Total cost.: .....................---... ..---...
                                                    _    ..----.
                                                              ___-                       --
                                                                                          _            48,259.87        39, 606. 86

Total expended---...--..    ---------
                                ....--       ------------------------                 ------------ 47, 700. 03          40, 157. 45

       -----------
Allotted.....                  ----                ------------ ------------                          125,000.00 ..


Balance unexpended July 1, 1936                           -------------                                          $77,299. 97

      Amount to be accounted for  --------------------------                                                        77,299. 97
Gross amount expended--------------------------$40,205.58
Less reimbursements collected_-- ------         __     48. 13
                                                                                                                    40,157. 45
      Balance unexpended June 30, 1937----------------------                                                        37, 142. 52
Outstanding liabilities June 30, 1937__----------------------------                                                       9. 25

      Balance available June 30,' 1937----------------------                                                        37,133.27
Accounts receivable June 30, 1937

          Unobligated balance available June 30, 1937----________                                                   37, 133.27

PROTECTIVE WORKS AND MEASURES,                       LAKE OF THE WOODS                    AND RAINY          RIVER, MINNE-
                                                    SOTA, 1928-34
Total cost of permanent work to June 30, 1937 ___ ___-----                                                      $373, 595. 15
Net total expenditures___--.......      __      -      --                                                        373, 595. 15
Total amount appropriated to June 30, 1937--------------------                                                   373, 595. 15

          Fiscal year ending June 30                     1933              1934           1935           1936             1937


Cost of new work----------- ---------                $18, 693. 12       $42,031. 28    $95,060. 26    $43, 753. 69 ---------....
Cost ofmaintenance----------------                -----
                                                    -                   ----------------------------------------------
       Total cost__                             18,693. 12
                                .----------------------                  42,031.28      95,060.26      43, 753.69 --     ___---_-

Total expended---_--------------------.....           18, 590. 70        46, 718.05     89, 990.45     44, 302. 19 _-----_- -

Allotted----............-----------------------      -1,080.85            -324.00     ----------------------------------



                                                                                       E. M.     MARKHAM,
                                                          Major General, Chief of Engineer.
                                             FINDING LIST
    SHOWING THE SUBDIVISIONS                               OF THIS REPORT BY DISTRICTS


                                                                                                                 Page
River and Harbor Board--------------- ----------------                                                               26
Boston, Mass-------------------------                                  -------------------------                    28
Providence, R. I       ------------------------------------------------                                             79
New York City, first district_____------------------------ ----------                                              140
New York City, second district                      --------------------------------                               244
Philadelphia, Pa--------------------                                                                               277
Baltimore, Md-- ------------------------------                                                                     343
Washington, D. C                   -------------------------------------                                    --     386
Norfolk, Va--------------------------------------------------                                                      423
Wilmington, N. C------------                       ---------------------------------                               465
Charleston, S. C-------------                     ---------------------------------                               514
Savannah, Ga-_ ------------------------------------------------                                                    542
Jacksonville, Fla--------------------                              -------------------------- 567
Mobile, Ala--------------------                                       ------------------------                      44
                                                                                                                   6------
New Orleans, La., first district ____--------------                                           ----------           716
New Orleans, La., second district -------------------------------                                                  771
Galveston, Tex------------------------------------------------772
Mineral Wells, Tex-----------------                              ------ ---------------------                      828
Vicksburg, Miss-----------------------------------------------829
Memphis, Tenn_---          -------------------                                                                     865
Conchas, N. Mex-----                                -------------------------------                                894
St. Louis, Mo---------------                         -------------------------------                               899
Mississippi River between the Missouri River and Minneapolis, Minn_                                     ..         916
Rock Island, Ill------                 --------------------------------------                                      946
St. Paul, Minn---             ------------- ------------------------------- 957
Chicago, Ill-----            -----------------------------------------                                      970, 1263
Kansas City, Mo--------------------------------------------                                                        990
Omaha, Nebr                                                        ------------------------                        005
                                                                                                                 1----------------------
Fort Peck, Mont-------------                         -------------------------------                             1022
Nashville, Tenn ------------------------                            ------------------------                      1031
Ohio River, locks and dams and open-channel work ________________ 1051
Pittsburgh, Pa-----              ---------------------------------------                                         1072
Zanesville, Ohio---------                     ----------------------------------                                 1095
Huntington, W. Va----------------                                ---------                  ---------- 1111
Cincinnati, Ohio---------------                         ------------------------------- 1130
Louisville, Ky------------------------------------------------                                                   1136
Duluth, Minn--           ----------------------------------------------                                          1150
Milwaukee, Wis---------                           -----------------------------                                  1176
Detroit, Mich                                                                                                    1----------------------
Buffalo, N. Y        -----------------------------------------------                                             1332
Los Angeles, Calif          -------------------------------------------- 1402
San Francisco, Calif------                  -- ---------------------------------- 1423
Sacramento, Calif                                                                                                1----------------------
Portland, Oreg., first district                                                                       __-- ___________________-_
                                                                                                                 1473
Portland, Oreg., second district --------------                                       ----------        _-__ _ 1527
Seattle, Wash.-----------------___--___--                                                            -           1551
Honolulu, Hawaii---------------                             -------------------------                            1608
Puerto Rico------------------                          ------------------------------                            1622
Surveys, Flood Control Act approved June 22, 1936 and August 28, 1937__ 1642
Surveys for navigation, flood control, power, and irrigation -------------                                       1637
California Debris Commission- ------------                                  --- __--------__                     1648
Mississippi River Commission----_                       -------               -       -         -       -        1667
                                                                                                    1785
                                              INDEX


                                                   A
                                                                                                   Page
Abandonment and curtailment of river and harbor projects, review of
  reports--     ------------------------------------------------                                   1762
Abbapoola Creek, S. C., review of reports---------------------------                                541
Absecon Creek, N. J., improvement--- -----------                                                    336
Absecon Inlet, N. J.:
    Beach-erosion study -----               -----------------------------                          1775
    Improvement--------------------------------------------                                         334
    Review of reports------------------------------------------                                     342
Academy Creek, Brunswick Harbor, Ga., improvement-------------                                   -  557
Acushnet River, New Bedford Harbor, Mass., improvement--- ----------                                  88
Administrative expenses, emergency relief funds----------------- ---                               1666
Advanced funds for river and harbor improvement--_____--------                                        15
Agate Bay Harbor, Minn., improvement-------- -------------------                                   1175
Aguadilla Harbor, P. R., examination and survey-------------------1637
Alabama River, Ala.:
     Examination and survey of waterway to Tombigbee River----------715
     Improvement -------------------------------------                                      ------ 684
Alabama, State of, removal of water hyacinths from----------------680, 765
Alafia River, Fla., review of reports---------                          ----------------- 641, 643
Alamitos Bay, Calif.:
    Beach-erosion investigation _------                           --------                  -   __ 1775
    Examination and survey------------------------------------1422
Albany to Schenectady, N. Y., examination and survey of waterway ___                                242
Albemarle and Chesapeake Canal, N. C. and Va., improvement--------                                  447
Albemarle Sound, N. C., improvement of waterway to Norfolk, Va., via
  Pasquotank River --------------------------------------------                                     444
Alexandria, Va., improvement of Potomac River at-------------------                                 420
Algoma Harbor, Wis., improvement -----------------------------                                     1199
Allegheny River, Pa.:
     Bank protection          -------------------------------------------                          1092
     Construction of locks and dams---                     --------------------------              1077
     Examinations and surveys----------------------------------1094
     Improvement by open-channel work------------                                                  1091
Aliens Creek, Tex., examination and survey------ -                              ____________
                                                                                  --                826
Alligator River, N. C., improvement of waterway via                                                 447
Alloway Creek, N. J., improvement__----------------                                  -    --
                                                                                     _______        341
Alpena Harbor, Mich., improvement----------                                - ________
                                                                                 --                1310
Alsea Bay, Oreg., examination and survey----                              ---          ---------- 1525
Altamaha River and Sound, Ga., improvement -----------------------                                  555
Ambrose Channel, New York Harbor, N. Y., improvement-------------- 170
Amherstburg Channel, Detroit River, Mich., improvement ------------- 1303
Amite River, La.:
     Improvement          ----------------------------------------------                            735
     Review of reports--                                                                            770------------------
Anacortes Harbor, Wash., improvement-__ __--                                 ____________ _        1579
Anacostia Park, D. C--------                                     ----------------------            1766
Anacostia River, D. C.:
      Improvement_         ---------------------------------------------                            387
     Reclamation and development of the flats_______________     -___-                             1766
Anahuac Channel, Tex.:
     Improvement         ---------------------------------------------                               803
     Review of reports-----------------------                                ------------------     826
AnchQrage grounds, rules for establishment of ________----__               ------                  1762
                                                                                            1787
 1788                                            INDEX

Anclote River, Fla.:                                                                                      Page
      Examination and survey_                                                           -  -        -       6______..---------
                                                                                                            641
      Improvement---          ----      ---------------------------------------                             632
Anderson, Ind., flood control at --- ____--------------------------                                       1147
Androscoggin River, Maine and N. H., review of reports____----                                  -             77
Annapolis-Claiborne Ferry at Metapeake, Md., examination and survey of
   channel at entrance of_ __-________---------------------                                                 384
Annapolis Harbor, Md.:
      Improvement---           -------------------------------------------                                  376
      Review of reports--__-_----               ----------------------------------                          384
Annisquam River, Mass., improvement ------ ___--                            -------------                    41
Apalachicola Bay, Harbor, and River, Fla.:
      Examinations and surveys                                                       -------- 641,     714, 715
                                                                                               6------------------
      Improvement of channel to St. Andrews Bay-                                                            6___-__________
                                                                                                            657
      Improvement of harbor in bay- ...----------------------                                               647
     Improvement of river, including the cut-off, Lee Slough, and lower
        Chipola River-------------------------------------------                                            649
      Improvement of waterway to St. Marks River--------------------656
Appomattox River, Va.:
      Improvement------------------------------------                                            ----       439
     Review of reports                ------------------------------------------                           464
Appoquinimink River, Del., improvement----------------------------                                          341
Appropriations:
     Allotments under War Department Appropriation" Act of Apr. 26,
        1934         -------------------------------------------------                                       20
     Allotments under War Department Appropriation Act of Apr. 9, 1935_                                      21
     Allotments under War Department Appropriation Act of May 15, 1936_                                      22
     Miscellaneous civil works___------------------------------                                       12, 1762
     Permanent appropriations--------                       --        ----------------                       14
     Rivers and harbors and flood control_______---                   __------____14
                                                                          ------
Aqueduct, Washington, D. C., maintenance and repair of__                                  _______1770
Aquia Creek, Va., improvement-_                       ------------------------------                       420
Aransas Bay and Pass, Tex.:
     Improvement at Port Aransas ---------------------------------                                         816
     Improvement of channel to Corpus Christi (via Turtle Cove)--------                                    811
Arecibo Harbor, P. R.:
     Improvement          ----------------------------------------------                                  1630
     Review of reports-----                    -----------------------------------                        1637
Arkansas River, Ark. and Okla.:
     Examinations and surveys-                 ________----------------------------------                  893
     Flood control------------------------------------------------ 886, 888
     Improvement------               ---------------------------------------                               865
Arroyo Colorado, Tex., examination and survey___-___________----                             ___           826
Arshamomaque Creek, N. Y., examination and survey______ __________                                         242
Arthur Kill, N. Y. and N. J.:
     Improvement -------------                   --------------------------                  ------- 247
     Improvement of channel to Raritan River-------______________________                                  254
Ash Creek, Conn., examination and survey--------------------                                               138
Ashepoo River, S. C., improvement of waterway via__ ___- __-                                 ___           536
Ashland Harbor, Wis., improvement ------                       __--           ________--             -__ 1156
Ashley River, S. C., improvement --------------------------
Ashtabula Harbor, Ohio, improvement                           -------------------                         134_i
Assateague Channel, Va., examination and survey____________________                                        384
Association of Congresses of Navigation, permanent international-------- 1758
Atchafalaya River, La.:
    Improvement-----------------------------------------------                                             768
    Removing snags and wrecks_ .. _____ ______ --                              _______ -            -__ 907
Atlantic City, N. J., examination and survey of waterway to Fortescue
  Creek, N. J-------------------------------------------------342
Atlantic Gulf Ship Canal, Fla., improvement--------------------------                                      579
Atlantic Intracoastal Waterway to the Gulf Intracoastal Waterway, ex-
  amination and survey                    ------------------------------------                     _--      67
Atlantic tidewaters to Great Lakes deeper waterways, review of
  reports_                                      --                                                 242, 1402
Augusta, Ga., improvement of Savannah River below-                              _------               546
Au Sable River, Mich., review of reports--_---_,--..- ..                                          -_ 1332
                                                    INDEX                                                 1789
                                                        B
                                                                                                            Page
Back Cove, Portland Harbor, Maine, improvement- --.-------------                                             - 70
Back Creek, Md.:
    Examination and survey ------__-                    -----------------------                               384
    Improvement -----------                  ----------------------------------                               375
Back Creek, Va., improvement of channel to York River --------                                                417
Back River, Md., examination and survey---------------------------                                            385
Back Sound, N. C.:
    Beach-erosion study -------            __-________                                                      1775
    Examination and survey_                                 -              _____-------                       513
                                                                                                         _-----__-
    Improvement              ----------------------------------------------                                   487
Back (Weymouth) River, Mass., improvement_______------------------                                             70
Bad River, S. Dak., review of reports                  ----------------------------- 021
Bagaduce River, Maine, examination and survey------------------                                                77
Bakers Bay, Columbia River, Wash.:
    Improvement ----------------------------------------------                                               1516
    Review of reports----                ------------------------------------- 1525
Baltimore, Md.:
    Engineering district__          ______--__-____________-                                           -      343
    Harbor and channels:
         Improvement ------------                      ----------------------------                           344
         Review of reports--------------------------------------384
Banana River, Fla., examination and survey of waterway to Mosquito
  Lagoon--         -----------------------------------------------                                             41
Barataria Bay and Bayou, La., improvement_________________________                                            736
Barcelona Harbor, N. Y., examination and survey                          ------------------                  1401
Bar Harbor, Maine:
    Examination and survey-                                                __________           -_
                                                                                                _--            77
                                                                                                        ____-__-_____
    Improvement------------------ --                                                                           70
Barnegat Inlet, N. J., improvement______________________                                                      339
Barren Island Gaps, Md., improvement ----------------------------                                             380
Barren River, Ky., improvement----                     ---------------------------                          1136
Barrington Harbor, R. I., examination and survey_                                                             139
Bartholomew Bayou, La. and Ark.:
    Improvement -----------------------------------------------                                               853
    Improvement of Louisiana-Texas intracoastal waterway via                                                   45
                                                                                                              7---------
Bastrop Bayou, Tex., improvement---------------------------------825
Baton Rouge to New Orleans, La., improvement of Mississippi River
  between                         --------------------------------------                                       24
                                                                                                              7------------
Battery, The, New York Harbor, N. Y., removal of shoal in Hudson River_                                       194
Baudette Harbor and River, Minn., improvement_____________________ 1175
Bay Ridge Channel, New York Harbor, N. Y., improvement_____________                                           177
Bay River, N. C.:
    Examination and survey--                       -------------------                ---          ---        513
    Improvement ---------              ------------------------------------                                   472
Bayside Channel, New York Harbor, N. Y., improvement ---------------                                           70
Beach Erosion Board---------                         ------------------------------ 1773
Bear Creek, Calif., examination for flood control-------------------- 1472
Bear Creek, Ky., improvement-               ..---------------                       __      __              1136
Beaufort Harbor and River, N. C.:
     Improvement of harbor________----- -------                                 ____          -__             483
     Improvement of waterways to Cape Fear River, including waterway
       to Jacksonville, N. C----------------------------                                                      488
     Improvement of waterway to Pamlico Sound via Core. Sound----__-                                          485
     Improvement of waterway to New River                         ------------------------ 488
     Review of reports---            ---------------------------------------                                  513
Beaufort Inlet, N. C.:
     Improvement of waterway to Norfolk, Va------------------------ 447
     Review of reports--------------------------------------                                           464,513
Beaufort, S. C.:
     Improvement of waterway to Charleston_5________--                     --             -    -__            536
                                                                                                            5___
     Improvement of waterway to St. Johns River, Fla.__....______                                      551, 568
    Improvement of waterway to Savannah, Ga ----------                                                     551
Beaver Creek, S. Dak., review of reports_---------          -      -                         -          _ 1021
Beaver River, Pa., improvement_ ------             --------------------                                   1076
1790                                           INDEX

                                                                                   Page
Belfast Harbor, Maine, improvement--  ...     __ -      -70
Belhaven Harbor, N. C.:
       Improvement---------------------------------------------------              466
      Review of reports------------------------------------------------513
Bellingham Bay and Harbor, Wash., improvement----------__--------                1580
Belvidere Cove and Harbor, Calif., review of reports-------------                 1449
Benicia Harbor, Calif., examination and survey_.1_______        -______--        1449
.Benton Harbor Canal, St. Joseph Harbor, Mich., improvement ------------ 1225
Beresford Creek, S. C., examination and survey-----------                          541
Berkeley Harbor, Calif., review of reports------------------------------ 1449
Bete Grise Bay, Mich., examination and survey------------------------            1175
Bethel Harbor, Alaska, examination and survey ------------------                 1606
Betsie Lake, Frankfort Harbor, Mich., improvement--         ___                  1252
Beverly Harbor, Mass., improvement------------------------ -----------              70
-Big  Black River, Miss., flood control------------------------------------        860
Big Blue River, examination--____-__________                                     1004
Big Deadmans Creek, Calif., examination for flood control________-               1472
Big Lagoon, Fla., improvement of intracoastal waterway via------------             663
Big Mulberry Creek, Ark., examination--- --               ____---_____---893
Big Pigeon Bayou, La., improvement----------------------------------               768
Big Sandy Creek, N. Y., review of reports ---      ---          -------          1401
Big Sandy River, W. Va., and Ky.:
      Examination for flood control_    _________-__________-_                    1130
      Improvement, including Tug and Levisa Forks __--         ___-               1125
                                                                              -____
.Big Suamico River, Wis., improvement --------                           -___     1182•
Big Sunflower River, Miss., improvement ____-...       _________--_______          847
Big Thoroughfare River, Md.:
      Improvement----------------------------                                      364
       Review of reports .------------------                                                      386
  Big Timber Creek, N. J., improvement___________________                   _______             322
  Biloxi Harbor, Miss.:
       Examination and survey __-___-____-_____-__--                         -      -     -___714
       Improvement-------------- --------------------------------------                        704
  Biscayne Bay, Fla., improvement ---------------...
                                               .                                               596
  Blackfish Bayou, Ark., improvement__________________                  _______876
  Black Lake, Mich., improvement of Holland Harbor-- ----- __----. ___- -                     1233
  Black Rascal Creek, Calif., examination for flood control_---____-___ __ 1472
  Black River, Ark., and Mo.:
       Examination and survey _________________________-______                                 893
       Improvement----------------------------------------------------                         872
  Black River, La., improvement_             --        _______-__-                 -            834
  Black River, Lorain, Ohio, improvement             _____-----       - ____---        -      1340
  Black River, Mich.:
       Examination and survey-----------------------------------------                       1175
       Improvement                                                                           1----------------------
  Black River, N. C., improvement----------__----_--                     -         -__         509
  Black River, Wis.:
       Improvement ---------------------------------------------------- 961
       Review of reports ------------------------------------------------                      969
  Black Rock Creek, Mass., examination and survey of waterway via____                            77
  Black Rock Harbor and Channel, N. Y., improvement ____                 ____________ 1373
  Black Rock Harbor, Conn., improvement                                                          17
                                                                                               1--------------------
  Blackstone River, R. I. and Mass., examination and survey---------------                     138
  Black Walnut Harbor, Md., examination and survey -------------------- 384
  Black Warrior River, Ala.:
       Improvement__        _                                                                   90
                                                                                               6---------------------
      Review of reports------------------------------------------------                        714
  Blackwater Creek, Va., review of reports--------------------------------                     464
  Blackwater River, Fla., improvement _--__-                  _______      __---------676
  Blackwater River, Mass., and N. H., examination and survey of water-
    way via-----------------------------------------------------------77
  Blackwater River, Va., improvement_-_ ___-----------.____.__.______                          463
--Blaine Harbor, Wash., examination and survey-- -----------------------                       606
  Blind Pass, Fla., beach-erosion study-_---                                                  1774
                                                                                        6-----------------41,
                                                      INDEX                                                  1791
Block Island, R. I.:                                                Page
    Construction of harbor of refuge-----------------------------    100
    Examination and survey      ------------------------------------ 138
      Improvement of Great Salt Pond----                                                                  _     129
Blood River, La., improvement---------------                                                                    733
Bluestone Reservoir, New River, W. Va., construction ___-                                    -       ___-1066
Boards:
    See also Commissions.
    Beach erosion------ -------------------------------------- 1773
    Engineers for Rivers and Harbors ---- _______-- -                               -_____-            ___       26
    Experimental towboats, Mississippi River-------------------- 1757
    International:
         Lake of the Woods, board of control _______________--                      --        --        -      1782
         Lake Superior, board of control--------------------------- 1782
         Niagara River, special international__.                                .                       -      1______________
                                                                                                              1781
         St. Croix River, Maine and New Brunswick, board of control._,1780
         St. Lawrence River, near Massena, N. Y., board of control----                                         1782
Boca Ciega Bay, Fla., improvement-------------                               ----            _                  631
Bodega Bay, Calif., review of reports-                         --           _____________-____                 1450
Boeuf River, La., improvement -----........- ____                              ____-             _              841
Bogue Falia, La., improvement_---- - ------                                __      _____------__              -730
Bois de Sioux River, S. Dak., flood control-------------------------                                            968
Bonfouca Bayou, La., improvement__                                -
                                                                 -----        ____-           -      __         728
Bonnet Carre spillway-------- -------------------------------- 1743
Bonneville, Oreg., construction of dam at--____________                                  ___-                  1529
Bon Secours Bay and River, Ala.:
    Examination and survey-------------------------------------714
    Improvement of intracoastal waterway via _____                                     __________-              663
Boothbay Harbor, Maine, improvement .--- ___.______________-__                                                    70
Boston Canal, La., examination and survey___________                                      ________        _     770
Boston, Mass.:
    Engineering district____                ___________--    -            ______-           ---           --      28
     Examination and survey---------                             --------------------------                      77
    Improvement of harbor_..... _________ ______                                  __-__-_                         48
Boundary waters:
    Between Lake of the Woods and Lake Superior, surveys and chart-
       ing---------------------------------------------------1776
    Investigations and surveys:
         Lake Champlain --                   ------------------------------------                              1776
         Lake of the Woods                  --------------------------------- 1776, 1782
          Lake Superior------                                                                                  1776
         Niagara Falls               ----------------------------------------- 1781
         Rainy Lake, Minn. and Ontario__________---                     -     --        --        --       - 1776
          St. Croix River, Maine and New Brunswick, board of control----                                       1780
          St. Lawrence River ----------------------------------                                                1777
Brandywine River, Wilmington Harbor, Del., improvement ----                                        __ -      -292
Branford Harbor, Conn.:
     Improvement             ------------------------------- --------------- 109
    Review of reports               -----------------------------------------                                   138
Brazos Island Harbor, Tex.:
     Improvement ----------------------------------------------                                                 820
    Review of reports               ------------------------------------------ 826
Brazos River, Tex.:
    Examination and survey                    -------------------------------------
                                                    _____                                                       826
    Improvement from Velasco to Old Washington ______________-                                            _     825
    Improvement of mouth                    -------------------------------------- 807
Brazos-Santiago Pass, Tex., improvement                                                                           20
                                                                                                                8--------------------
Breton Bay, Md., improvement                     ----------------------------------- 420
Brevoort levees, Ind., flood control ------------------------------- 11@
Brewton, Ala., flood control at                            ----------------------------- 7------
Bridgeport Harbor, Conn.:
    Examination and survey-                     ---------------------------------                               138
      Improvement ___-----                 --------------------------------------------                         117
Bridges:
      Construction across navigable waters--------                                  --    ---                 1762
      Rules governing opening of draws_----- -                                    -----         --       -    1762
       20196-37-pt. 1-113
1792                                        INDEX

                                                                           Page
Broad Creek, Md., improvement----------------------------------------       380
Broad Creek River, Del., improvement----------------------                  380
Broadkill River, Del., improvement-------------------------------------     313
Broad Sound, Boston Harbor, Mass., improvement------------------------       48
Broadwater Creek, Md., examination and survey      ---------------          384
Broadway Road, Va., examination and survey                                  384
Bronx Kills, N. Y., examination and survey------------------------------242
Bronx River, N. Y., improvement -------------------------            -----        151
Broward County, Fla., waterway through, examination and survey--------            641
Browns Creek, N. Y., improvement---------------------------                       227
Brule, Plaquemine Bayou, La., improvement---------------------------              760
Brunswick Harbor, Ga., improvement_        ---------------------                  557
Budd Inlet, Olympia Harbor, Wash., improvement_                                  1566
Buffalo Bayou, Tex., improvement of waterway to Houston        __                 795
Buffalo Creek, N. Y., examination and survey----------------------------         1401
Buffalo, N. Y. :
     Engineer district ------------------------------                            1332
     Improvement of Black Rock Channel and Tonawanda Harbor .......              1373
     Improvement of harbor__ ___________-                                        1367
    Review of reports on harbor, river, and ship canal       -----               1401
Buffalo River, Miss., flood control--------------------------------------         772
Bulkhead lines, establishment--                                                  1762
Burlington Harbor, Vt., improvement                                               223
Burns Creek, Calif., examination for flood control                               1----------------------
Burr Creek, Conn., improvement-----------                                         117
Burwells Bay, Va., examination and survey_                        ---------       464
Butler Lake, Fla., examination and survey of waterway via--------------           641
Buttermilk Channel, New York Harbor, N. Y., improvement --------------            181
Byram River, Port Chester Harbor, N. Y., improvement_--           -----            140

                                                C
Caddo Lake, Tex. and La., improvement by construction of dam at foot of__   831
Cadron Creek, Ark., examination---------------------------------_           893
Caillou Bayou,.La. (Little), improvement                                    768
Calaveras River, Calif., improvement__                                     1455
Calcasieu Pass and River, La.:
     Beach erosion study                                          -------- 1775
    Improvement           ---------------------------------------           760
     Improvement of intracoastal waterway via _____________________         745
     Review of reports----------------------------------------------770
California Debris Commission ----------------------------------------      1648
Caloosahatchee River, Fla.:
      Examinations and surveys                                                      41
                                                                                   6-------------
     Improvement-------------------------------------------------       604
Calumet Harbor and River, Ill. and Ind. :
    Improvement of harbor (South Chicago Harbor) ------------------- 1270
    Improvement of river--------------------------------------    970, 1270
     Review of reports_-                      -----------------              990, 1287
Calumet Lake, Ill., improvement--------------------------------------     1276
Calumet-Sag Channel, Ill.:
    Improvement ---------------------------------------------------- 970
    Review of reports------------------------------------                  990
Cambridge Creek, Md., examination and survey-------------------------384
Cambridge Harbor, Md.:
    Improvement---------------------------------------------------         3531
    Review of reports------------------------------------------------      384
Qamden Harbor, Maine, improvement -----------------------------------       70
anadian (South) River, N. Mex., construction of Conchas Dam and
  Reservoir-----------------------------------------                       894
Canal Creek, Calif., examination for flood control----------------------- 1472
Canals :
    See also Waterways.
    Albemarle & Chesapeake Canal, N. C., improvement---                    447
    Benton Harbor Canal, St. Joseph Harbor, Mich., improvement .-----     1225
                                              INDEX                                           1793
Canals-Continued.                                                                                Page
    Boston Canal, La., examination and survey-----------------------770
    Cape Cod Canal, Mass., improvement                   ---------------------------                59
    Cascades Canal, Columbia River, Oreg ________________________                                1536
    Chesapeake & Delaware Canal, Del. and Md.:
         Examination and survey                        ___-----------------342
         Improvement-------------------------------------------                                    295
    Chicago Sanitary and Ship Canal, Ill., improvement ----------------                            970
    Company Canal, La., improvement of Louisiana and Texas intra-
         coastal waterway via -----------------------------------                                  745
    Dalles-Celilo Canal, Oreg. ang Wash., improvement--_______             -____                 1538
    Delaware and Raritan Canal, N. J., examination and survey                   ---------          277
    Dismal Swamp Canal, Va., and N. C., improvement of waterway via__                              444
    Drummond Lake Canal, Va. and N. C., improvement of waterway via-                               444
    Estherville-Minim Creek Canal, S. C., improvement----------------                              521
    Felsenthal Canal, Ark. (Ouachita River), review of reports .........                           864
    Florida East Coast Canal, Fla., improvement----------------------582
    Florida Ship Canal, improvement          --            _________________                       579
    Franklin Canal, La., examination and survey-__                         ____________            770
    Harvey Canals, La., improvement of intracoastal waterway via- ____                             745
    Hillsboro Canal, Fla., examination and survey__--                   -                          6________--
                                                                                                  643
    Houma-Terrebonne Ship Canal, La., examination and survey--------                               770
    Illinois and Mississippi Canal, Ill., improvement__________________                            946
    Interoceanie Canal, surveys_----                               --
                                                   ____________-___-               _____         1759
    Lake Washington Ship Canal, Wash., improvement----------------                               1573
    Le Claire Canal, Iowa, improvement----------..                                                 916
    Louisville and Portland Canal, Ohio River, Ky., enlargement- -- ____ 1052
    Manasquan-Barnegat Canal, N. J., examination and survey---------- 342
    Miami and Erie Canal, Ohio, examination and survey ________-----                             1094
    Miami Canal, Fla., examination and survey                                                      643
    New York State Barge Canal, N. Y.:
         Enlargement_ --------------------------------------------                                 213
         Examination and survey --------------------------------                                 1402
    St. Lucie Canal, Fla., examination and survey-----------------641,                             643
    St. Marys Falls Canal, Mich., improvement_ __-__---          -                        --     1288
    Sturgeon Bay and Lake Michigan Ship Canal, Wis., improvement--..                             1195
    West Palm Beach Canal, Fla., examination and survey --- _---                            _      643
Canaveral Harbor, Fla., examination and survey                     --------------------- .641
Caney Creek, Ky., examination and survey                       -------------            --       1149
Cannes des Bayou, La., improvement------------------------------                                   758
Cannonball River, N. Dak., review of reports-----------------------1021
Cape Charles City Harbor, Va., improvement ______- __-____________-                                380
Cape Charles, Va., examination and survey---__-___- ___                          -________-        384
Cape Cod Canal, Mass., improvement                  _________-----____                              59
Cape Fear River, N. C.:
    Improvement above Wilmington--________------                                ------------- 501
    Improvement at and below Wilmington ___________ -                                   -          498
    Improvement of Northeast Branch_________________---------------                                506
    Improvement of waterways to Beaufort, N. C., including waterway to
       Jacksonville, N. C----------                 ------------------------------ 488
    Improvement of waterway to Winyah Bay, S. C                                                    491
    Review of reports----------------------------------513,                                   541, 567
Cape Lookout, N. C., improvement of harbor of refuge________________                               511
Cape May, N. J., improvement of Cold Spring Inlet, N. J_______-                            -_      333
Cape Vincent Harbor, N. Y., improvement__________________________                                1395
Carlin Bayou, La.:
     Improvement                ----------------------------------------------                   755
    Review of reports---- ----                                                                   770
Carquinez Strait, Calif., review of reports__ _____-----____---1450
Carrabelle Bar and Harbor, Fla.:
    Examinations and surveys__          --------------------------                         714, 715
     Improvement                                                                                 6-------------------
Carter Lake, Iowa and Nebr., examination and survey----------------1021
Carters Creek, Va., improvement ---------------                                        ----      406
Cascades Canal, Columbia River, Oreg- --        -   -1536
Caseys Pass, Fla., improvement------------------6----                                            20
1794                                        INDEX

Cashie River, N. C.:                                                                     Page
    Improvement      -----------------------------------------------                      455
    Review of reports         ______________                    ___              ------- 464
Cataco Creek and its branches, examination for flood control-----------1051
Cattaraugus Creek, N. Y., examination and survey _______________--           -   -       1401
Cavallo Pass, Tex., improvement of channel to Port Lavaca_-----------                     814
Cayuga Creek, N. Y., examination and survey_______________________                        401
Cazenova Creek, N. Y., examination and survey                                            1401
Cedar Bayou, Tex., improvement---------------                                             804
Cedar Bay to Thoroughfare Bay, N. C., improvement__________________                       482
Cedar Creek, Conn., improvement -----------                                               117
Cedar Creek, Md., examination and survey -385
Cedar Creek, N. J., examination and survey              ____________________              342
Cedar Keys Harbor, Fla., improvement-----------------------------640
Champlain Lake, N. Y. and Vt.:
    Burlington Harbor, Vt., improvement ______-                             -223
                                                                           __-
    Examinations and surveys--_---                  __________________                    242
    Narrows, improvement       --------------------------------------- 221
    Plattsburg Harbor, N. Y., improvement___--- ----                           __-------227
    Port Henry Harbor, N. Y., improvement----- ------                                     227
    Surveys and charting-----------              ------     --------------------- 1776
Chandlers River, Maine, examination and survey-----------------------                      77
Channels. See Rivers and harbors, canals and waterways.
Charles River, Boston, Mass., improvement_---               ____------------48
Charleston, S. C.:
    Engineering district   ----------       ------------------------------                514
    Examinations and surveys-------------- ---                      -----------           541
     Improvement of harbor                           ---              ---------               528
    Improvement of waterway to Beaufort----------------------                                   536
    Improvement of waterway to Winyah Bay_------------                                          521
Charlevoix Harbor, Mich.:
    Improvement ------------------------------------                                           1257
    Review of reports----------------------------                                              1262
Charlotte Harbor, Fla.:
    Examination and survey---------------------------------                                     641
    Improvement ----------------------                                                          618
Charlotte (Rochester) Harbor, N. Y.:
    .Examination and survey --...-----------------------                                 _     1402
    Improvement -------------------------------------------                                    1384
Charts and maps, northern and northwestern lakes--------------- 1763, 1775
Chatham (Stage) Harbor, Mass., improvement_________________________                              81
Chattahoochee River, Ga. and Ala.:
    Examinations and surveys---------------------------------                              714, 715
    Flood control --         -----------------------------------------                          655
    Improvement below Columbus -__6______--6------------------653
Cheat River, W. Va., examination--__                    --------------------                   1094
Cheboygan Harbor and River, Mich.:
    Examination and survey --_               --------------                 ------         -1__1332
     Improvement of harbor _______                __--____                   ___ _             1308
Cheesequake Creek, N. J., improvement___________________-__-_____                               276
Chefuncte River, La., improvement_________    -----                    ___ _                    730
Chehalis River, Wash.:
    Examinations and surveys              ----------------------                    ----     -1606
     Improvement     ----------------------------------------------                            1555
Chelsea River or Creek, Mass., review of reports-----------------------                          77
Chena Slough, Alaska, examination and survey-                                      -1607
                                                                    _________-------
Chequamegon Bay, Ashland Harbor, Wis., improvement_______-_______ 1156
Cherrystone Channel to Cape Charles, Va., examination and survey of
  channel connecting__ -------------                    _--------------------                   384
Chesapeake and Albemarle Canal, N. C. and Va., improvement------------ 447
Chesapeake and Delaware Canal, Del. and Md.:
    Examination and survey-------___-__---------                            --                  342
     Improvement ---        -------------------------------------------                         295
Chesapeake Bay, Md. and Va.:
     Examinations and surveys-------                  ---------                           384, 464
     Thimble Shoal, improvement--------- ----                                                  428
     York Spit, removal of shoals opposite- ---------      _                          ---      344
                                                   INDEX                                       1795
                                                                                                 Page
Chester River, Md., improvement--------------------------------------- 380
Chester River, Pa., improvement_---------------------------------------  341
Chetco Cove, Oreg., review of reports--------------------------------   1525
Cheyenne River, S. Dak., flood control--------------------------------- 1020
Chicago Harbor and River:
     Improvement       of harbor----------------                                                 1266
    Improvement of river-------------------------------------------                            1268
    Improvement of South Chicago Harbor------------------------                                1270,
    Review of reports----------------------------------1287
Chicago, Ill., engineering district                                                      9----------------------------
                                                                                         970,  1263
Chicago Sanitary and Ship Canal, Ill., improvement-----------------                             970
Chickasaw Creek, Ala., improvement__-_----                  ----------------------
Chickasawha River and tributaries, Miss., examination and survey                       ----...
                                                                                                682
                                                                                                715
Chico Bayou, Fla., examination and survey-                    ---                               715
Chincoteague Inlet and Bay, Va.:
    Examinations and surveys                                                              384, 386
    Improvement of bay---------------------------                                               369
    Waterway on coast of Virginia, improvement                                         -        380
    Waterway to Delaware Bay, improvement-----------------------                                319
Chipola River, Fla.:
    Improvement of lower river__                                                                649
    Improvement of upper river---------------------------.                                      651
Chocolate Bayou, Tex., improvement                                                              825
Choctawhatchee Bay      and  River,     Fla.   and   Ala.:
    Examination and survey                                                                        15
                                                                                                7---------------------
    Improvement of East Pass Channel                           ...................-             672
    Improvement of river----------------------------------                                      711
    Improvement of waterway to Pensacola Bay, Fla                                               662
    Improvement of waterway to West Bay, Fla_                                        -          660
Choptank River, Md., improvement                                                                380
Choptank River to Little Choptank River, Md., waterway :
    Examination and survey                                                                _     384
    Improvement ---------------------------------------------------- 354
Chowan River, N. C., review of reports_                                                         464
Christiana River, Del., improvement of Wilmington Harbor ......----....                         292
Cincinnati, Ohio, engineering district                                              ___--      1130
Claiborne-Annapolis Ferry at Matapeake, Md., examination and survey
  of channel at entrance__---------------------------------------------                         384
Claiborne Harbor, Md., improvement__                                   _                        380
Clatskanie River, Oreg., improvement_----------------------                          -         1499,
Clear Creek, Tex., improvement---------------------------                                       806
Clearwater Harbor, Fla.:
    Examinations and surveys -                                                                  641
    Improvement of channel to Tampa Bay                                                         631
Cleveland Harbor, Ohio:
     Improvement -------------------------------------------                                   1345
    Review of reports------------------------------                                            1401
Clinch River, Tenn. and Va., improvements                                                      1048
Clinton Harbor, Conn., examination and survey                                                   138
Clinton River, Mich., improvement------------------------------------1317
Coan River, Va.:
     Improvement-                                                                               3---------------------
     Review of reports-----------------                                                         423
Cobscook Bay, Maine, improvement of Passamaquoddy tidal power project_                            29
Cockrells Creek, Va., improvement_----------------------------------- 420
Coenties Reef, New York Harbor, N. Y., removal_                                                 184
Cohansey River, N. J.:
     Improvement--------------------------                   -------- ------                    331
     Review of reports---------------------------               -------------------- 342
Cold Spring Inlet, N. J., improvement----------------------                                     333
Coldwater River, Miss., improvement----------------------------------- 853
Colfax Cut-Off, La., improvement---                                                               61
                                                                                                8---------------------
Collinsville, Ala., flood control                                                                 14
                                                                                                 7--------------------
Colorado River, Tex., review of reports-------------                                      826, 827
Columbia River, Oreg. and Wash.:
     At Bakers Bay, Wash., improvement___-------------------                                   1516
     Bonneville, Oreg., construction of dam at-------------------------- 1529
1796                                              INDEX

Columbia River, Oreg. and Wash.-Continued.                                                 lage
    Cascades Canal                                                                _------------------------------
    Celilo Falls to Snake River, including tributaries, improvement from_ 1541
    Celilo Falls to The Dalles Rapids, improvement------------------- 1538
    Examinations and surveys----------_______________ 1525, 1526, 1550, 1606
    Flood control --------------------------------------------------- 1519
    General statement regarding _______________
    Mouth, improvement---------------------------------------------
                                                                   _______________        1487
                                                                                          1487
    Mouth to Willamette River, improvement ________________________ 1492
    Vancouver to Bonneville, improvement_----    .....          --------       __    -    1528
    Wenatchee to Kettle Falls, Wash., improvement _____________-____ 1598
Columbia, S. C., examination and survey of waterway to Charleston,
  S.C --------------------------------------------------------------                        541
Commencement Bay, Wash., improvement ___________________________                          1568
Commerce for calendar year 1936______________________________                                  5
Commissions:
    See also Boards.
    California Debris Commission _________----------------------------------              1648
    Mississippi River Commission__-________------___                                      1667
    Permanent International Association of Congresses of Navigation____ 1758
Company Canal, La., improvement of Louisiana and Texas intracoastal
  waterway via-_____-----------__------------__                                             745
Compton Creek, N. J., improvement-----                 --------------------                 267
Conchas Dam and Reservoir, N. Mex., construction_--------                -------            894
Conchas, N. Mex., engineering district------------------------------                        894
Conecuh River, Ala.:
    At Brewton, Ala., flood control___-------------------------------------                 712
    Improvement -------------------             -----------------------------               711
Conemaugh River, Pa., examination and survey                        ------                1_____________--
                                                                                         1094
Coney Island Channel, N. Y., improvement------- ---                    ------               174
Coney Island Creek, N. Y., improvement-------------------- -----                            175
Congaree River, S. C., improvement-------------------------------------                     525
Congresses of Navigation, Permanent International Association of _______ 1758
Conneaut Harbor, Ohio:
    Improvement----------------------- ----------------------------- 1358
    Review of reports____--__---- _ _--      __----------                                 1401
Connecticut River, Mass. and Conn.:
    Examinations and surveys----------------------------------------                        139
    Flood control ___________-----------------------------1-----                      130-137
    Improvement above Hartford, Conn                                                        1-----------______
                                                                                            129
    Improvement below Hartford, Conn---------------------------------105
Conoy Lake, Md., examination and survey ___________________________                         423
Consolidated cost and financial summary __                 -           __----------                 18
Contentnea Creek, N. C.:
    Examination and survey ------------------------------------------                              513
    Improvement -----------------------------                                                      479
Cooper River, N. J., improvement-------------------------------                                    321
Cooper River, S. C., review of reports    __________          ______________                       541
Coosa River, Ga. and Ala. :
    At Rome, Ga., flood control ----------------------------------------                          713
    Improvement -                           ----------------                                      686
    Review of reports---------------------------------------------                                715
Coosaw River, S. C., improvement of waterway via             __ _____________                     536
Coos Bay, Harbor, and River, Oreg.:
     Examination and           survey                                                            1---------------1526
    Improvement of entrance to bay and harbor------------------------                            1476
    Improvement of river------------ --------------------------------                            1478
Coquille River, Oreg.:
      Improvement-_------------------------------------                                          1474
    Review of reports----------------------------------------------- 1526
Cordova Harbor, Alaska, improvement _________                             1591
                                                         -__________________
Corea Harbor, Maine, improvement________________- _____                     30
Core Sound, N. C., improvement of waterway to Beaufort Harbor
Corney Bayou, La., improvement_
                                                                           485
                                                                           843
                                                                                      --------
Cornucopia Harbor, Wis., improvement .......--------                      1155
Coronado Beach, Calif., beach-erosion investigation_____                  1775
                                               INDEX                                       1797
Corpus Christi, Tex.:                                                                      Page
     Examination and survey         ------------------------------------- 827
     Improvement of channel to Aransas Pass------------____________                        811
     Improvement of intracoastal waterway to the Mississippi River___ 745,779
Corsica River, Md., improvement______________                                              380
                                                                                      .________----
Corte Madera Creek, Calif., review of reports --            --------------------- 1450
Cos Cob Harbor, Conn., improvement-------------------------------129
Cossatot River, Ark., examination and survey ________--------------                         864
Cost and financial summary, river and harbor works______---             --     -____-_        18
Council Bluffs, Iowa, flood control at------------------------------1019
Courtenay, Fla., examination and survey                                                       41
                                                                                            6--------------------
Cowlitz River, Wash.:
     Improvement                                                                          1----------------------
     Examination for flood control___-------------------------------- 1526
     Flood control-------------           --     ----------------------------             1524
Cowpasture River, Va., improvement of James River, Va----------------430
Craft, sunken, removal of --      ------------------------------------ 1762
Craig Harbor, Alaska, examination and survey-----------------------1606
Cranberry Island Harbor, Maine, examination and survey_-                         -__-___- 77
Crescent City Harbor, Calif.:
     Improvement                                                                          1----------------------
     Review of reports     ----------------------------------------- 1450
Crescent Lake and Dunns Creek, Fla., improvement_ .-.                ____     ____-         640
Crescent Lake, Fla., examination and survey                                                 6641
Crisfield Harbor, Md.:
     Improvement                          ---------------------                               361
    Review of reports     ------------------------------------------ 384
Croatan Sound, N. C., improvement of waterway via -_____-_____-____      444
Crocket Lake, Wash., channel to Puget Sound, review of reports--------- 1607
Crooked River, Fla., examination and survey-_____ ______________ -       714
Crooked River, Oreg., examination for flood control                     1551
Cross Rip Shoals, Mass., improvement_________________________________     85
Crystal River, Fla., improvement___                                      640
Cumberland River, Ky. and Tenn.:
     Examination and survey _______________________                                ___        1051
     Flood control            -----------------------------------------                       1049
     Improvement_                -----------------------------------                          1031
Cumberland Sound, Ga. and Fla.:
    Examination and survey of waterway to Mississippi River---------- 567
    Improvement of waterway between Savannah and Fernandina- ....      551
    Improvement of waterway to St. Johns River, Fla___ _______-___     568
Current River, Ark. and Mo., improvement-------------------------      874
Curtailment and abandonment of river and harbor projects, review of
  reports     ---------------------------------------------------- 1762
Curtis Bay, Baltimore, Md., improvement of channel to ______________ _ 344
Curtis Creek, Md., review of reports--_____-------------------------   384
Cutler Bayou, La., improvement-____     --------------------           736
Cuttyhunk Harbor, Mass.:
     Examination and survey           ---------------                                          139
    Improvement--------------                  ------------------------------    91
Cuyahoga River, Cleveland, Ohio:
    Improvement     ----------------------------------------------            1345
    Review of reports-                     -------------------------------     401
                                                                              1------
Cypress Bayou, Tex. and La.:
    Construction of dam at foot of Caddo Lake ______--______------_            831
    Improvement of, including connecting lakes between Shreveport, La.,
      and Jefferson, Tex---------------------------------------                831
Cypress Creek, Md., improvement           --------------------------------- 378
                                                     D
Dalecarlia Reservoir, Washington, D. C     ----------------                                   1771
Dalles-Celilo Canal, Oreg. and Wash., improvement -----------------                           1538
Dams, water power. See Water power.
D'Arbonne Bayou, La., improvement_-- ------------------                                        843
Darien Harbor, Ga., improvement------------------                                              565
1798                                        INDEX

                                                                                               Page
Dark Head Creek, Md., examination and survey________________________                            385
Davis Creek, N. C., improvement of waterway via ____ ____________-__                            491
Dawho River, S. C., improvement of waterway via____________________                             536
Daytona Beach, Fla.:
    Beach erosion investigation--- ____________     ------------------------------
                                                     ______________                            1775
     Examination and survey            --      --                -      -        -      -       641
Deals Island, Md.:
    Examination and survey-------___________________-                                _____      385,386
    Lower Thoroughfare, improvement----                                                              380
    Upper Thoroughfare, improvement                                          ------------            359
Debs Inlet, N. Y., improvement_----------                         -_        --------                 168
Deep Bay, N. C., improvement of waterway to Swan Quarter Bay-------- 465
Deep Creek, Va., improvement_ .__-____.______________                                           441, 444
Deep River, Wash., improvement                                                                     1______________
Deer Island Thoroughfare, Maine, improvement_---                ..........             _____-          70
Delaware and Chesapeake Canal, Del. and Md.:
    Examination and survey--             ----------------------------------- 342
     Improvement--       --------------------------------------------                                295
Delaware and Raritan Canal, N. J., examination and survey_                                   -       277
Delaware Bay and River, Pa., N. J., and Del.:
    At Camden, improvement_                  ---------------------------                             287
    Breakwater and harbor of refuge in bay, improvement -                                            314
    Examinations and surveys____                     ___------- -------------                --      342
    Philadelphia to sea, improvement----                                                             284
    Philadelphia to Trenton, improvement_______________________                                      278
    Review of reports-----------------_                                                         277, 342
    Waterway to Chesapeake Bay, Del. and Md.:
         Examination and survey--_                                                                   342
         Improvement ---------------                                                                 295
    Waterway to Chincoteague Bay, improvement---------------------                                   319
    Waterway to Rehoboth Bay, improvement -----                                                      316
De Leon Springs to St. Johns River, Fla., examination and survey of
  waterway __ ____-__-----------641
Denison Reservoir, Tex., flood control                                                               860
De Poe Bay, Oreg.:
    Examination and survey                -------------------------------                           1526
    Improvement-----------------                                                                    1486
Derelicts. See Wrecks.
Des Cannes Bayou, La., improvement-                                                                  758
Deschutes River, Oreg., examination for flood control                                               1551
Des Glaises Bayou, La., flood control --                                      __                      772
Des Moines River, Iowa, review of reports ---------------------------                                957
Des Plaines River, Ill.:
    Flood control---------              --------------------------------- 914, 986
     Improvement of Illinois waterway-----                     ------------------                    970
Detroit Harbor, Wis---------------------                                                            1194
Detroit, Mich., engineering district               --------------------------                       1288
Detroit River, Mich.:
     Examinations and surveys-------------                                                          1332
     Improvement       ------------------------------------------                                   1303
Dickinson Bayou, Tex., improvement                   ---------------------------                      825
Dismal Swamp Canal, Va. and N. C., improvement of waterway via                                       444
District of Columbia:
     Anacostia Park                                                                                 1766
     Anacostia River, reclamation of flats--------__-______---____                                  1766
     Aqueduct, increasing water supply-----------------------------1770
    Aqueduct, maintenance and repair__________                                                      1770
     Government buildings, consumption of water in                                         --       1770
     Improvement of Potomac River___                  ___________________________ 387, 391
     Water supply, increase in__-_______________________________-                                   1770
Dog Island Harbor, St. George Sound, Fla., improvement----------------                               646
Dog River, Miss., improvement -----       ____-         ____________               ______             701
Dogue Run, Va., examination and survey--- ----------------------                                 423
Dollar Bay, Fla., examination and survey                                                         642
Dolls Creek, N. C., examination and survey_---------                                             513
Dorchester Bay and Neponset River, Mass., improvement_--- ---------                               70
                                         INDEX                                      1799
                                                                          Page
Double Bayou, Tex., improvement -------------------------------------- 802
Douglas Harbor, Alaska, examination and survey_                   --     1606
Drawbridges :
    See also Bridges.
    Rules for opening ------------                                        1762
Drawings, northern and northwestern lakes---                             1776
Drift removal from New York Harbor-----------------------------      198,1764
Drum Inlet, N. C.:
    Beach-erosion study                                                   1775
    Examination and survey                                                 513
Drummond Lake Canal, Va. and N. C., improvement of waterways via__         444
Drum Point Harbor, Md., examination and survey ---------------------- 423
Dry Pass, Alaska, improvement--------------------------------------- 1583
Dry Run, Iowa, flood control-----------------------------------------      967
Duck Creek, Calif., examination for flood control------__                1472
Duck Creek (Smyrna River), Del., improvement---------------------          305
Duck Island Harbor, Conn., improvement------------------------------       108
Duck Point Cove, Md., examination and survey                               384
Dulac Bayou, La., improvement of waterway via Grand Caillou and Le
  Carpe Bayous, La., to----------------------------------------------      739
Du Large Bayou, La., examination and survey                                770
Duluth, Minn.:
     Engineering district           ----------------------------------                1150
   Improvement of Duluth-Superior Harbor--- ------------                              1152
Dunkirk Harbor, N. Y., improvement .....                                              1365
Dunns Creek and Crescent Lake, Fla., improvement-------------                          640
Dupont Bayou, La., improvement---                                                      736
Dupre Bayou, La.:
   Examination and survey ------                                                       770
   Improvement ----------------------------------------                                727
Duwamish River, Wash.:
     Examination and survey __                         ---                            1606
   Improvement of east and west waterways, Seattle Harbor -1570
Duxbury Harbor, Mass., improvement ----------------------------------                   70
Dymers Creek, Va., improvement----------------------------------                       420
                                            E
Easements, flowage, on Lake of the Woods-----------------------                  1783
East Chester Creek, N. Y., improvement--------------------------------             147
Eastern Bay, Claiborne Harbor, Md., improvement -____-__________-                 380
East Pass Channel, Fla., from Gulf of Mexico into Choctawhatchee Bay:
    Examination and survey-_______---_____-________                                715
    Improvement ----------------------------------------------------               672
East Pass, Fla., improvement of Carrabelle Harbor                                   46
                                                                                   6---------------------
East Pearl River, Miss., improvement-_______________________              ___711
Eastport Harbor, Maine, examination and survey--------------------                  77
East River, Brunswick Harbor, Ga., improvement--------------------- 557
East River, N. Y.:
    Improvement, including Coenties Reef-------------------------- 184
    Review of reports---------------------                              -         242
East Rockaway (Debs) Inlet, N. Y.:
    Examination and survey of waterway to Great Peconic Bay                       242
    Improvement                             ----                                  1168------------------
Eau Gallie, Fla., examination and survey of ship canal to Atlantic Ocean_          641
Echo Bay Harbor, N. Y., improvement-----------------------------144
Edenton Bay, N. C., examination and survey------------------------- 464
Edenton Harbor, N. C., improvement- __.______-__                                   454
Edgartown Harbor, Mass., improvement                                                86
Eel River, Calif., flood control--------------    ---------------------          1449
Eel River, Mass., improvement of Plymouth Harbor...                                      70
Egegik River, Alaska, improvement_ ..  _______-  _______-_____                        1593
Elfin Cove, Alaska, examination and survey-------------                               1606
Eli Cove, Md., examination and survey- ------------                                    384
Elizabeth River, N. J., improvement --...           ---------                          255
1800                                      INDEX

Elizabeth River, Va.:                                                  Page
     Improvement of Norfolk Harbor, including Eastern, Southern, and
       Western Branches ---------------------------                     424
     Improvement of waterway to sounds of North Carolina -------------  444
    Review of reports------------------------------------------------464
Elk River, Md.:
     Improvement----------------------------------------------------380
    Review of reports_                                                                384
Elliot Bay, Wash., improvement of Duwamish River and east and west
   waterways -----------------------------             -
                                                     -----                           1570
Elokomin Slough, Wash., improvement----    ________        _                         1512
Emergency Relief Act funds, work accomplished with__ _________                       1666
Emergency relief program, works included to Oct. 15, 1937___                            77__________
Empire Cut, Calif., improvement_              ___--           ---------              1464
Engineers, the Board of, for Rivers and Harbors_...____----_____-            26
Erie and Miami Canal, examination and survey__                             1094
Erie Basin, N. Y., improvement of channel in Lake Erie------------------1373
Erie Canal, N. Y., enlargement_-__ __    __-__-__-                 -__-213
Erie Harbor, Pa.:
    Examinations    and surveys----------------                                104, 1401
     Improvement---------------------------------------------------              1361
Erie, Lake:
     Black Rock Harbor, improvement of entrance to_____________ ____1373
     Examination and survey of waterways to Ohio River--------------             1094
     Surveys, charts, etc., of northern and northwestern lakes------------ 1777
     Water levels----------------      -- ---------------------------      1775, 1778
Escambia River Basin, flood control________________________________               712
Escambia River, Fla., improvement------------------------------                   711
Escanaba Harbor, Mich., examination and survey__--        ___-____ ____-         1262
Esopus Creek, N. Y., improvement of Saugerties Harbor ________________            227
Estherville-Minim Creek Canal, S. C., improvement-- ______________ ___            521
Estimates of appropriations required:
     Miscellaneous civil works____ ________---------                  __     _- 1764
     Rivers and harbors, etc-----------------                                      20
Everett Harbor, Wash.:
     Improvement----------------------------            -------------------- 1576
     Review of reports-----------------------------------------------1606
Examinations and surveys for flood control________________________ 1637, 1642
Expenditures :
     Miscellaneous civil works__________------------_                            1763
     Rivers and harbors and flood control-------------------             --        16
Experimental towboats, board on_________________----------------1757

                                                  F

Fahrens Creek, Calif., examination for flood control---------------                    1472
Fairhaven Harbor, Mass.:
     Improvement-----------------------------------------------                          88
     Review of reports-------------------------------------------                       139
Fairport Harbor, Ohio, improvement_________--_______                       ________ 1349
Fajardo Harbor, P. R., examination and survey----------                   ________     1637
Falia, Bogue, La., improvement_--           -__________-_____-          -    -    -     730
Fall River Harbor, Mass., improvement -------                                            92
Fall River, S. Dak., review of reports ------                          ___------------1021
Fancy Bluff Creek, Ga., improvement______--      __-__------- ------                    565
Far Creek, N. C., improvement---------------------------------------                    467
Farm Creek, Md., examination and survey------------------------------                   384
Feather River, Calif., improvement__________              ___---------                 1463
Federal Water Power Act, investigation and supervision of projects-____-               1760
Felsenthal Canal, Ark. (Ouachita River), review of reports---------                     864
Fenholloway River, Fla., examination and survey______-------                            641
Fenwicks Island Cut, S. C., improvement of waterway via_______ ____-            -       536
Fernandina Harbor, Fla.:
     Improvement_--------------------------------- -----------------                    562
     Improvement of waterways to Savannah, Ga ------------------                        551
                                                       INDEX                                                          1801
                                                                                                                      Page
Fighting Island Channel, Detroit River, Mich., improvement_______-___                                                 1303
Filtration plant, Washington Aqueduct, D. C---------------------------                                                1770
Financial summary as of June 30, 1937                           _____________                             _________     18
Fire Island Inlet, N. Y.:
     Beach erosion study -------------------------------------------- 1775
     Improvement------__--                      -------------------------------  167
     Review of reports_______          ______---_________-                       242
Fire Point Cut-Off, La., flood control-----------------------------------         863
Fishers Island, N. Y., improvement of Hay (West) Harbor _____________            129
Fishing Bay, Md., improvement                ____________________________        355
Fishing Creek, Md.:
     Examination and survey_______________----------- -                     __   384
     Improvement--       _____.-- --    ___---                                   373
Fitchburg, Mass., flood protection for----------------------------------           71
Five Mile Creek, Ala., review of reports____            ______________________   714
Fivemile River Harbor, Conn., improvement                                        122
Flagler Beach, Fla., examination and survey__________________________            641
Flat Cap Creek, Md., examination and survey                                      385
Flathead Lake, Mont., improvement of Poison Bay---------------------            1598
Flint River and Creek, Ala. and Tenn., examination for flood control ..--.      1051
Flint River, Ga.:
      Improvement                                                       -------------                                  711
    Review of reports--    __----                                       714
Flomaton, Ala., flood control at--------------------------------------  712
Flood control, examination and surveys for-----------------------1637, 1642
Florida Bay, Fla., improvement of intracoastal waterway to Miami Bay,
  Fla__                                    -------------
                                            ________                                    _---             ------        601
Florida East Coast Canal, improvement of intracoastal waterway, Jack-
  sonville to Miami, Fla., via----------------------------                  582
Florida, removal of water hyacinths from waters of State              680, 765
                                                                6----------37,
Florida River, Fla., examination and survey_--                             715
Florida Ship Canal, improvement_                                           579
Flushing Bay, N. Y.:
     Improvement----------------------------                                              --------                     153
    Review of reports-----------------------------------------------                                                   242
Folly Creek, Va., examination and survey _____________   ______-__                                                     384
Fond du Lac Harbor, Wis., examination and survey                                               -------                1262
Fore (Weymouth) River, Mass., improvement --------------------------                                                    54
Fore River, Portland, Maine, improvement ------------------------------                                                 70
Fortescue Creek, N. J., examination and survey of waterway to Atlantic
  City, N. J----------------------------                                                                               342
Fort Peck, Mont.:
    Construction of reservoir----------------------------------------022
     Engineering district___                               ----------------                                           1022
    Review of reports---------------------------------------------       1030
Fort Pierce Harbor, Fla., improvement --------------------------------- 587
Fort Point Channel, Boston Harbor, Mass., improvement_________________     48
Fort Sanilac Harbor, Mich., beach-erosion study------------------------1775
Fourche Bayou, Ark., examination and survey____________ ____________      893
Fox Creek, Md., examination and survey-------------------------------     385
Fox River, Wis.:
    Improvement___ --------------------------------------------------- 1188
    Improvement of Green Bay Harbor__            -------------           1183
    Review of reports ----------------------------------------------- 1262
Foys Flats, N. C., improvement of Trent River at------------------------481
Frankfort Harbor, Mich., improvement-------------------------------- 1252
Franklin Canal, La., examination and survey________________________       770
Franklin to Mermentau, La., improvement of waterway from                  751                            ----------
Freeport Harbor, Tex., improvement                                        8--------------------
Frenchboro Harbor, Maine, examination and survey--------------------       77
French Broad and Little Pigeon Rivers, Tenn., improvement_-- -  _______ 1048
French Creek, Pa., examination and survey of waterway via____ ---   ____ 1094
FUlton, Miss., flood control at                                           713
1802                                           INDEX

                                                   G
                                                                         Page
Gaging northern and northwestern lakes, level_--------------------       1778
Galveston Bay and Harbor, Tex.:
    Improvement of Galveston Channel_____                            __   7______________
                                                                          787
    Improvement of Galveston-Texas City Channel____________________       790
    Improvement of harbor entrance______________________________          783
    Improvement of waterway to Houston_-----------_                       795
Galveston, Tex., engineering district-----------------------------------772
Garden Creek, Md., examination and survey-----------------------------423
Gasconade River, Mo., improvement----------------------------------      1002
Gedney Channel, New York Harbor, N. Y., improvement ------------------ 170
Genesee River, Charlotte Harbor, N. Y., improvement                            -------               1384
George Island Landing, Md., examination and survey--------------------                                 385
George, Lake, St. Johns River, Fla., improvement___________________ _                                  574
Georges River (Thomaston Harbor), Maine, improvement ______ _______                                      70
Georgetown Harbor, S. C., improvement of Winyah Bay_________________                                   514
Gladstone Harbor, Mich. :
    Examination and survey -- ___-_____-__--               --                   -_______      __1262
    Improvement -----------------------------------------                                            1261
Glaises, des Bayou, La., flood control_________ _________________7___                                  772
Glencove Creek, N. Y., improvement _________-__________                                   ___          156
Glen Haven and Glen Arbor, Mich., examination and survey ___________ 1262
Glen Island, N. Y., examination and survey                                                             243
Gloucester Harbor, Mass., improvement _______----____________                                            41
Goose Creek, Md., examination and survey __________________________                                    385
Goose Creek, Tex., examination and survey____________________________                                  827
Gordons Pass, Fla., examination and survey____________________________                                 642
Government buildings, District of Columbia, consumption of water in...                                1770
Gowanus Creek Channel, New York Harbor, N. Y., improvement ___-- _                                      180
Grand Bayou and Lagoon, Fla., examination and survey__                                                  715
Grand Bayou Pass, La., examination and survey -                                                         770
Grand Caillon Bayou, La., improvement_____________________________                                      739
Grand Haven Harbor, Mich.:
    Improvement --  ___---_______- - ____--- --                                                       1235
     Review of reports _________________________________                                              1262
Grand Isle, La.:
    Beach-erosion study --.                ______..                                               . 1774
     Examination and survey-------------                                                                770,
Grand Marais, Mich., improvement of harbor or refuge ________________ 1170
Grand Marais, Minn., improvement of harbor ....                                                       1150
Grand Pass, La., improvement                          ____---------------------                         736
Grand Rapids to Lake Michigan Waterway, examination and survey                                        1262
Grand River, Fairport Harbor, Ohio, improvement_____________________                                  1349
Grand River, Mich., improvement_------- ----------                                       ___          1235
Grand Traverse Bay, Mich., examination and survey----------1175, 1262, 1777
Grantley Harbor, Alaska, examination and survey____________________                                   1607
Grant Parish Levees, La., flood control ________________________________                                862
Grays Harbor, Wash., improvement------------------------------------1555
Grays Reef Passage, Mich., improvement___________________________                                     1259
Grays River, Wash., improvement                                                                       1514
Great Choptank waterway to Little Choptank River, Md., examination
   and survey--------------------------------------------384
Great Kills, Staten Island, N. Y:
     Examination and survey------------------------                                                     277
     Improvement-----   .           -------------------------------------------                         260
Great Lakes:
     Channels in waters connecting, improvement                                                        1288
     Control and regulation of waters of Niagara River and preservation
        of Niagara Falls                                                                               1781
     Discharge                                           -----                                         1775
     Elevation -------------------------------------------------- 1776,1778
     Examination and survey of coast                                               --                  1287
     Review of reports on deeper waterways to Atlantic tidewater..                               242, 1402
      Surveys, charts, etc., of northern and northwestern lakes                                        1775
       Water levels-_                                                 ________           _     1776, 1778
                                                 INDEX                                              1803
Great Lakes-Continued.                                                                               Page
     Waterway to Hudson River-enlargement of New York State Barge
       Canal--------------------------                         -------------              ----- --    213
Great Peedee River, S. C.:
     Examination and survey --------------------                                                      541
     Improvement----------------------------------                                                    519
Great Salt Pond, Block Island, R. I., improvement                                                      129
Great Sodus Bay, N. Y., improvement of harbor                                                         387
                                                                                                     1-------------------
Great South Bay, N. Y., imnprovement                     ---------------------------                  165
Green Bay Harbor, Wis.:
     Improvement___ ------         ------------------------------------ --- 1183
     Review of reports                  __----------------------------------------- 1262
Greenbrier River, W. Va., examination for flood control-------------- 1130
Green Jacket Shoal, Providence River, R. I., removal                      --------------           _     96
Greenport Harbor, N. Y., improvement____-------------__________                                        160
Green River, Ky., improvement -----                    ----------------------------- 1136
Green River, Utah, examination and survey                                                            1422
Greenvale Creek, Va., examination and survey___________
Greenwich Harbor, Conn.:
                                                                                   _______         -   423
     Examination and survey--                 -------------                                            139
     Improvement-----------                  ---------                                                 127
Griffin Lake, Fla., waterway to Kissimmee River, review of reports- -_                                 642
Grossetete Bayou, La., improvement------------------------------                                       740
Guadalupe River, Tex., improvement to Victoria---------------------                                    825
Guayanes Harbor, Yabucoa, P. R.:
     Examination and survey                                         ---------------------- 1637      1--------------
      Improvement------_ _                          -----------------------------                    16-------
                                                                                                     131
Guayanilla Harbor, P. R., examination and survey-                                 ------             1637
Gulfport Harbor, Miss.:
     Examination and survey----------------------- -------------- 715
     Improvement -----------                   -------- ----------------                 --------- 706
Gull Lake, Minn., reservoir dam, construction--                       ---------------------- 958
Gunpowder River, Md., examination and survey---------------------385
                                             H
Hackensack River, N. J.:
    Examination and survey of waterway to Hudson River--------------243
    Improvement------------             ---------------------------------                            244
Hadley, Mass., flood protection for__-- -------------                          __        ___ 131, 132
Haines Harbor, Alaska, examination and survey_                         ____-           --
                                                                                      _______-1607
Hammersley Inlet, Wash., improvement-_-- ----------                                       __       1565
Hampton Creek, Va., improvement--------------------                            ----------- 434
Hampton Roads, Va.:
    Improvement of approaches to Norfolk Harbor.________________                                     424
    Improvement of channel to Phoebus, Va                  ------------------------ 436
Harbor Beach, Mich., harbor of refuge, improvement___ -                       ________ -1314
Harbor Island Basin, Tex., improvement------                   --------------------- 816
Harbor lines, establishment-----------------                    ----------------                   1762
Harbors and rivers. See Rivers and harbors.
Harlem River, N. Y.:
    Examination and survey ------------------------------------- 242
    Improvement                   -------------------------------------                               91
                                                                                                     1--------
Harris Lake, Fla., examination and survey__________ _____                            ___ __          642
Hartford, Conn., flood protection for-___________________________                                    137
Harvey Canals, La., improvement of intracoastal waterway via---------- 745
Hashamomuck Creek, N. Y., examination and survey_________          ---              __         - -42
Hatfield, Mass., flood protection for_..        __-______-___                       - ______
                                                                                           --        133
Haverhill, Mass., flood protection for-------------------------------72
Havre do Grace, Md., improvement of Susquehanna River near--------- 348
Hawaii engineering district--------------------------                                               1608
Haw Creek, Fla., examination and survey ---------------------------                                   41
Hay (West) Harbor, N. Y., improvement ___________________                                            129
Hearns Creek, Md., examination and survey_- --- _____-                            -         -_____- 385
Heart River, N. Dak., review of reports--------___                                                  1021
Hell Gate, East River, N. Y., improvement- - - - --      -                                         -_ 184
Hempstead Harbor, N. Y., improvement----------------------- -                                         155
1804                                                INDEX

                                                                                                                  Page
Hendricks Harbor, Maine, review of reports_-__         ------------                        77
Herring Bay and Rockhole Creek, Md.:
     Examination and survey. --------------------------                                   385
     Improvement -       --------------------------------------------                     380
Hillsboro Bay and River, Fla., examination and survey---------------641, 643
Hillsboro Inlet and Canal, Fla., examination and survey                                   6--------------643
Hilo Harbor, Hawaii:
     Examination and survey-------------                                                 16-----
                                                                                         1622
     Improvement--------------------------------------                    --------       1612
Hingham Harbor, Mass., improvement__---------------                                        70
Hiwassee River, Tenn., improvement- --------  _-_---        ---       -        -   _     1048
Hog Island, Va., review of reports --------             _________ ___        -       -__  385
Holland Harbor, Mich., improvement_                      ___
                                                   ----------     ____      __           1233
Hollywood Beach, Fla., beach-erosion study------------------------642, 1774
Hollywood Harbor, Fla., improvement____ ________ __-__________-_                          594
Holmes River, Fla., improvement_____-- .... ----      ________ -        _                 711
Homer Harbor, Kachemak Bay, Alaska, examination and survey                               1607       ---------
Homochitto River, Miss., flood control _________                                          771
Homosassa River, Fla., improvement __--                   -
                                                        ___--   -   -     -      -     -  634
Honga River, Md., improvement                                           --------------                            380
Honolulu, Hawaii :
    Engineering district __---____-___________
                         --                                                                                       1608
    Examination and survey___          ___________                                                                1622
    Improvement of harbor_ ...........  ______                   -------------       _                            1608
Hoosic River, N. Y., Vt., and Mass.:
    Flood control__-          -      -    -              -           -       -           -_                        232
    Review of reports__------------------------------------------------                                            242
Hoquiam River, Wash., improvement ----------------------------------                                              1598
Horn Harbor, Va., improvement ________________                            __________                               411
Horn Island Pass, Miss., examination and survey____----- --                        __715
Hoskins Creek, Va.:
    Improvement -----------------------------------------------------                                              402
     Review of reports                               ------------------                                            423
Houma-Terrebonne Ship Canal, La., examination and survey                                                          7________---
                                                                                                                  770
Housatonic River, Conn. :
   Improvement            ------------------------------------------                                               115
   Review of reports--------------------------------------------                                                   139
Houston to Galveston Ship Canal, Tex.:
   Improvement ----------------------------------------------------                                                795
     Review of reports_            -                          ----------------                                     827
Hudson Creek, Fla., examination and survey__------------------------- 642
Hudson River, N. Y.:
   Examinations and surveys____-- __   ___---243
   Improvement above New York_______-_-     __-_______---____ -       207
   Improvement at New York                                            194
   Peekskill Harbor, improvement-----------------------------------203
   Rondout Harbor, improvement-------------------------------------   205
   Saugerties Harbor, improvement-----------------------------------  227
   Tarrytown Harbor, improvement_                       __            201
   Waterway to Great Lakes-enlargement of New' York State Barge
        Canal-----------------------_                                            ------------                      213
Hueneme Harbor, Calif., examination and survey __ __-_____________ -                                              1422
Hulls Creek, Va., review of reports__                             -                                                423
Humboldt Bay and Harbor, Calif.:
    Improvement ----------------------------------------------------                                              1443
     Review of reports__-               -   -----                                                     ___         1450
Huntington Harbor, N. Y.:
   Examination and survey---------------------------------                                           --------      243
     Improvement __-------------------------                                                                       227
Huntington, W. Va., engineering district_                     _________1111
Huron Harbor, Ohio :
     Improvement -------                                                                                          1335
    Review of reports                                                                                        -_   1402
Huron Lake:
    Channels in waters connecting Great Lakes, improvement                                      -           __    1288
    Surveys, charts, etc                   _-------_-________   _                                           1775,1777
    Water levels_-_____-             ___________
                                            -         --   -___                                             1775, 1778
                                             INDEX                                          1805
                                                                             Page
Hutchinson River (East Chester Creek), N. Y., improvement___ _____-  - -       147
Hyacinths, water, removal:
    From Alabama, Mississippi, Louisiana, and Texas waters                     765
                                                                         6---------80,
    From Florida waters     ------------------------------------- 637,680
Hyannis Harbor, Mass., improvement_....______      -----------------            84
Hydraulic mining in California, regulation and preparation of plans------ 1649
Hydraulics. See Water levels.
Hydrology. See Water levels.
                                                 I
Illinois and Mississippi Canal, Ill.:
     Examination and survey__-------________---________                                          957
     Improvement       ----------------------------------------------                            946
Illinois River, Ill:
     Flood control--         ---------------------------------------- 914,986
     Improvement ----------             ------              --------------------------           970
     Review of reports__________________________-----------------------                          990
Illinois Waterway, Ill., improvement-------                                                      970
Indiana Harbor Canal, Ind., review of reports-----------------------1287
Indiana Harbor, Ind., improvement-______ ___--______________________                            1277
Indian River, Del.:
     Improvement       ----------------------------------------------                            318
     Review of reports-------------             ----------                                       342
Indian River, Fla.:
     Improvement of intracoastal waterway, Jacksonville to Miami, Fla.,
        via----------        ----------------------------                       -------------    582
     Review of reports----------------------------------                                ---- 642,643
Indian River Inlet, Del., beach-erosion study-                  -----------------     __        1775
Inland waterways. See Canals and Waterways.
Inside routes. See Canals and Waterways.
Insular possessions:
     Honolulu, Hawaii, engineering district--__------------------- 1608
     Puerto Rico engineering district____________________________                               1622
International Association of Congresses of Navigation_________________                          1758
International boundary waters-----------------                                   ___-__         1780
Interoceanic Canal, survey----            ------------------------------                        1759
Intracoastal waterways. See Canals and Waterways.
Ipswich River, Mass.:
      Examination and survey-------------------------------------                                 77
     Improvement                                     -----------------------------                70
Irrigation, surveys for       ------------------------------------------ 1637
Irvington Harbor, N. Y.:
      Examination and survey -------------------------------------                               243
      Improvement -----------------------------------                                            200
Island Creek, Md.:
      Examination and survey-------------                      ------------------------          423
      Improvement      ---------------------------------------------                             352
Isle au Haut Thoroughfare, Maine, examination and survey _________- ---                           77

                                         J
Jackson Creek, Va.:
    Improvement        ----------------------------------------------              409
    Review of reports--      ----------------------------------------              423
Jackson Harbor, Wis        ------------------------------------------             1194
Jackson, Miss., flood control at __________________________-               ___     714
Jackson River, Va., improvement of James River, Va-------------------430
Jacksonville, Fla. :
    Engineering district                                                            67
                                                                                   5--------------------
    Examinations and surveys--         ----------------------------------           42
    Improvement of intracoastal waterway to Miami, Fla ------ __                   582
                                                                                 -__.
    Improvement of St. Johns River opposite --     ---------------                 569
Jacksonville, N. C., improvement of waterway to Beaufort ------       __--_    _   488
Jamaica Bay, N. Y., improvement       .--------                             -      227
James River, Va., improvement----------                                            430
Jefferson Islands, Md., examination and survey-                  -                             385
1806                                          INDEX

Jefferson-Shreveport Waterway, La. and Tex.:                                          Page
     Examination and survey                                                         -8648--------------------6
     Improvement ------       -----            ----                ------------------ 831
Jeffries Point Channel, Boston Harbor, Mass., improvement                                48
Jekyl Sound, Ga., improvement of waterway via                                            51
                                                                                        5---------------------
Jobos Harbor, P. R., examination and survey-                                          1637
Johnsons Bayou, La., improvement           ----------------------------                 825
Johnsons Creek or River, Conn., improvement-------------------------117
Johnsons Pass, Fla., review of reports-------------                                     642
Jones Creek, Md., examination and survey -                                              385
Jones Inlet, N. Y.:
     Beach erosion study            --------------------------------------            1775
     Review of reports      -------------------------------------------                 243
Jordan River, Miss., improvement_                                                       708
Judith Point, R. I., construction of harbor of refuge-                                  1291
Juneau Harbor, Alaska:
     Examination and survey                ----------------------                 --- 1607
     Improvement-------                   -----------------                           1590
Jupiter Inlet, Fla., examination and survey            -----------------------          642

                                                  K

Kahului Harbor, Hawaii, improvement-----------------------------                                  1611
Kake Harbor, Alaska, examination and survey-                                                      1607
Kalamazoo River, Mich., improvement----------------                                               1230
Kanawha River, W. Va., improvement         ----                                                   1115
Kankakee River Basin, Ind., flood control          --------------                                   989
Kansas City, Mo., engineering district______________________________                               990
Kansas Citys, Mo. and Kans., flood control-     --  -------                                       1002
Kansas River, Kans.:
    Flood control-----------------------                        1002, 1003,                       1004
    Review of reports---------________-------------------------------                             1004
Kaumalapau Harbor, Hawaii, review of reports--------------------                                  1622
Kaunakakai Harbor, Hawaii:
    Improvement -----------------------                                                            1617
     Review of reports----------                                                                  1622:
Kennebec River, Maine:
     Examination for flood control-----------------------------------                                77
     Improvement-----                 -         -__       -         -           --                   34
Kennebunk River, Maine, improvement------------------------------38
Kenosha Harbor, Wis.:
      Improvement          _--1222
     Review of reports-----                      __________                 _____                  -
                                                                                              ____--   1262
Kentucky River, Ky., improvement_-                              ---
                                                          - _____-              __-__________           1130
Ketchikan Harbor, Alaska, improvement _____-_______-                               -     -        -_____1582
Kewaunee Harbor, Wis.:
      Improvement----              -----------------------------------------                           1201
     Review of reports__ ------------------------------------------                                    1262
Keweenaw Waterway, Mich., improvement -------------------------- 1161
Keyapaha River, S. Dak., review of reports__________                              ____________ 1021
Keyport Harbor, N. J.:
     Examination and survey_________ ___________ -                                         _____         277
     Improvement           ------------ ----------------------------------                               266
Key West, Fla.:
     Examination and survey of waterway to Jacksonville                                                   42
                                                                                                         6______________
     Improvement of harbor at______________-_____                              - __-______-_             602
Kilehis River, Oreg., examination and survey______________________                                     1526
Kill Van Kull, N. Y. and N. J., improvement of Staten Island-New Jersey
  Channels----------------------------------------                                   -----------         247
Kingman Lake, D. C., reclamation and development of Anacostia River
  and flats-------------------------------------                                                       1767
Kiskiminitas River, Pa., examination and survey-                                 ---------- --         1094
Kissimmee River, Fla.:
     Examinations and surveys-------                   ----------                       641, 642, 643
     Improvement .-.----   ___----__--                                                            640
                                            INDEX                                         1807
Knapps Narrows, Md.:                                                                  Page
    Improvement-----------------------------                                           380
    Review of reports----------------------------------------                          385
Knappton, Wash., examination and survey-------------------------1526
Knobbs Creek, N. C., improvement-----------                          ----------------  451
Kodiak Harbor, Alaska, improvement__                     --------------------         1598
Kootenai River, Idaho and Mont., improvement                                          1598

                                                L
Labatre Bayou, Ala., improvement ---------------------------------                           700
Lackawanna River, Pa., examination and survey----------------                                385
Lacombe Bayou, La., improvement                                                              729
Lac Qui Parle Reservoir, Minn---------------------                                           968
Lafayette River, Va.:
    Improvement------------------------------------               -----                      438
    Review of reports----------------------------------------                                464
Lafourche Bayou, La.:
    Improvement-------             --------------------------------------                    738
    Review of reports------------------------------------------                               70
La Grange Bayou, Fla., improvement __-_______-___-                    __                     671
Laguna Madre, TeX., examination and survey--------------------------                         827
Lake Calumet, Ill., improvement -                           -------------                   1276
Lake Champlain, N. Y. and Vt.:
    Burlington Harbor, Vt., improvement .----------                                       223
    Examinations and surveys                                                              242
    Narrows, improvement                   --------------------------                     221
    Plattsburg Harbor, N. Y., improvement ------------------------- 227
    Port Henry Harbor, N. Y., improvement------------------------227
    Rouses Point, N. Y., improvement_________________________                     __      227
    Surveys and charting -----------------------------------                            1770
Lake Charles Deep Water Channel, La.:
    Examination and survey----------------------------------770
    Improvement                                            -------------------------- 763
Lake Harbor, Mich., review of reports________---                       __-_________     1262
Lake Mabel, Fla., improvement of Hollywood Harbor_________________                        594
Lake Montauk Harbor, N. Y., examination and survey----------------- 243
Lake of the Woods, Minn.:
    International Control Board           -------------------------------_              1783
    Regulation of levels                                                            --  1782
                                                                                        1-----------.....---
    Surveys and charting---------------------------------------- 1776
Lake Pontchartrain, La., improvement_--                  -----------------------          665
Lake River, Wash., improvement               ___---           ---                       1508
Lakes, Great :
    Channels in waters connecting, improvement_____________________ 1288
    Control or regulation of waters, of Niagara River and preservation of
      Niagara Falls---- --            -------                                           1781
    Discharge-------------                 -----------------------------------           1775
    Elevation     ------------------------------------------------ 1776
    Examination and suryvey of connecting channels                                      1094
    Review of reports on deeper waterway to Atlantic tidewaters -------                   242
    Surveys, charts, etc--------------             ___-______________
                                                                  -                     1775
    Water levels -------------                ----------------------------         1776,1778
Lake Superior Board of Control---              -----------------------------             1782
Lake Traverse, S. Dak., flood control ------------------------------- 968
Lake Washington, Miss., improvement______.________--                        ___----       853
Lake Washington Ship Canal, Wash., improvement------------------ 1573
Lake Worth Inlet, Fla.:
    Improvement ----------          -----------------------------------                   590
    Review of reports      ------------------------------------------                     642
La Lanche Bay, Ala., improvement of intracoastal waterway via--------- 663
La Loutre Bayou, La.:
    Examination and survey-------                 -----------------------------           770
    Improvement-------------------------------------- ---------- 726
Lamoille River, Vt., flood control--             ---------------                             228
     20196--37--pt. 1-   114
1808                                             INDEX
                                                                                                      Page
L'Anguille River, Ark., improvement-------------------------------876
Larchmont Harbor, N. Y., improvement_____________                                 _____________        227
Latham Slough, Calif., improvement ------------------------------                                    1464
La Trappe River, Md., improvement ___----                      ---         ---       ____              380
Lavaca Bay, Tex., improvement of channel from Pass Cavallo to Port
   Lavaca     -----------------------------------------------------                                    814
Lavaca River, Tex., examination and survey ____________________827
Lawrence, Kans., flood control at---------------------------------                                   1004
Le Carpe Bayou, La., improvement----------                                               _____         739
Le Claire Canal, Iowa, improvement ----------------                                 __- ---------     916
Leech Lake Reservoir, Minn., construction_-------------------                                          958
Lee Slough, Apalachicola River, Fla., improvement___________________                                   649
Legare Bayou, Miss., examination and survey________________________                                    715
Lehigh River, review of reports-----------------------------------                                     342
Leipsic River, Del., improvement_______---______________                                               341
Leland Harbor, Mich., improvement-------------------------------                                     1255
Lemon Bay, Fla., examination and survey__--__--_-------                                  ____--_       642
Lemon Creek, N. Y.:
      Improvement -----------                 ----------------------------------                       259
      Review of reports----- ------------------------------------                                      277
Levels, water. See Water levels.
Levisa Fork, Big Sandy River, Ky.:
      Examination for flood control-_---___________________- __ _                                    1130
      Improvement _--_____--------------                                                             1125
Lewis Bay and Harbor, Mass., examination and survey----------------139
Lewis River, Wash.:
     Examination for flood control_                    __--             ______-_________             1526
     Flood control---                                                                                 523
                                                                                                     1----------------------
      Improvement-------------------                         ----------------------------- 1509
Licking River, Ohio, review of reports__________________________                                     1111
Little Annemessex River, Md., examination and survey_______--__                                        385
Little Blackwater River, Md., examination and survey-----------------384
Little Caillou Bayou, La., improvement--______            ---              ______--___-    -     -     768
Little Choptank River to Choptank River, Md., waterway:
      Examination and survey----                                     ___
                                                            -----------                       ______   384
      Improvement ----------------------                                  --         -------           354
Little Creek, Md., examination and survey_____________________________                                 385
Little Deadmans Creek, Calif., examination for flood control                                          473
                                                                                                     1-----------
Little Elk River, Md., improvement---_______________________________                                   380
Little Girls Point, Mich., examination and survey __ -                            _________          1175
Little Island Creek, Md., examination and survey---------------------385
Little Kanawha River, W. Va., improvement ---                                              -----     1112
Little Machipongo River, Va., improvement --------------------------                                   380
Little Miami River, Ohio, review of reports_....___                             _-___ _____---       1136
Little Missouri River, Ark., examination and survey-____                                               864
Little Narrangansett Bay, R. I., review of reports_____----------                                      139
Little Neck Bay, N. Y., review of reports---------------------------                                  243
Little Pigeon and French Broad Rivers, Tenn., improvement-__                                 ---     1048
Little Pigeon Bayou, La., improvement                    ------------------------------ 768
Little River, Ark., examination and survey--------------------------864
Little River, Del., improvement-------------                               -----------                307
Little River, La., improvement__------------------------------------                                  853
Little River, S. C., improvement of waterway via_____________------------------                       491
Little Sarasota Bay, Fla.:
     Improvement of Sarasota Bay___            -----               -           ---------              622
      Review of reports _                --------------                      ---------                   43
Little Sodus Bay, N. Y., improvement of harbor           ---------------------- 1389
Little Wicomico River, Va., improvement---------------------------               397
Livingstone Channel, Detroit River, Mich., improvement                          1______--_____130
Locklies Creek, Va., improvement_____             ------------------------ 420
                                              __----------
Logansport,  Ind., flood control
         Loas-r,-d,--y               --------------------------------- 1146
                          otrla at_______________-                              1146
Long Beach Harbor, Calif., improvement_________--__________________            1409
Long Island Intracoastal Waterway, N. Y., improvement_                                                 164
Long Island State Park beaches, N. Y., beach-erosion investigation__.                                 1775
                                          INDEX                                        1809
                                                                                         Page
Long Prairie District Levees, Ark., flood control------------------------             862
Lookout Bight, N. C.:
    Examination and survey of channel to Back Sound-....              ___--- __       513
     Improvement----------------------------------------------------                  487
Lookout Cape, N. C., improvement of harbor of refuge__ ___________ -                  511
Lorain Harbor, Ohio, improvement --------- ____           ____-___      __--        1340
Los Angeles, Calif. :
    Engineering district--------         __       -____--      ---            -_ 1402
    Examination of river for flood control _--___-------------------1423
    Flood control on river_-__          ____-__            -__       -_             1420
    Improvement of harbor ------------------------------------------ 1409
Los Angeles County flood control and water conservation, California_ 1417,1420
Louisiana and Texas intracoastal waterway:
    Improvement, Mississippi River to Corpus Christi _____________           _ 745, 779
    Review of reports-----------------------------------------------827
Louisiana, State of, removal of water hyacinths from                                  765
                                                                                6----------------80,
Louisville and Portland Canal, Ky., enlargement_______--         __-__-____-_ 1052
Louisville, Ky., engineering district----------------------------------- 1136
Lowell Creek, Alaska :
    Flood control------------- -------------------------------------- 1602
    Survey for flood control____                                                    1----------------------
Lowell, Mass., flood protection at--- _______-__74
Lower Chipola River, Fla., improvement _______________________                       649
Lower Thoroughfare at or near Wenona, Deals Island, Md-------------                   380
Lubec Channel, Maine, improvement -----------------------------------                  70
Ludington Harbor, Mich., improvement--------------------------------245
Lyford levees, Ind., flood control -------------------------------------- 1146
Lynn Harbor, Mass., improvement--------------------------------------                  70
Lynnhaven Bay, Inlet, and River, Va., review of reports-----------------              464

                                             M

Mabel Bay and Lake, Fla., improvement of Hollywood Harbor               ----------- 594
Machodoc (Upper) Creek, Va., improvement ____---______                      ___     420
Mackay Creek, N. C., improvement______--____________-       --                  -461
Mackinac Harbor,   Mich.:
    Improvement --------------------------------------------------- 1331
    Review of reports______----------        ______-         -     -  -   -        1332
Mackinac Island, Mich., to Round Island, Mich., channel, improvement __            1296
Mackinac Straits, Mich., improvement of Poe Reef Shoal              ----------------
                                                                                   1296
Macon Bayou, La., improvement--------------------------------------                 839
Magothy River. Md.. examination and survey of channel to_----------                 385
Mahoning River, Pa. and Ohio, improvement--------------------------- 1076
Main ship channel, New York Harbor, N. Y., improvement------------                  170
Malden River, Mass., improvement_--_----        -- __         _______   ___          70
Mamaroneck Harbor, N. Y., improvement------------------------------142
Manasquan-Barnegat Canal, N. J., examination and survey-------------- 342
Manasquan Inlet and River, N. J.:
    Examination and survey------------------------ ----------------- 277
    Improvement---------------------------------------------------                  272
Manatee River, Fla.:
    Examination and survey--------------- -------------------------- 643
    Improvement----------------------------------------------------                 624
Manchac Bayou, La.:
    Examination of waterway via--------------------------------                     770
    Improvement--------------------------------------- ------------- 735
Manchac Pass, La.:
    Examination of waterway via-      ----------------------------                  770
    Improvement ----------------------------------------------------                732
Manchester Harbor, Mass., improvement -- -               --------                          70
Manhasset Bay, N. Y., improvement__                                                      227
Manistee Harbor and River, Mich.:
   Improvement --------------                                                           1248
   Review of reports on harbor----------------___
                                    --                                                  1262
Manistique Harbor, Mich., improvement- --       ---                               -     1176
1810                                            INDEX

Manitowoc Harbor, Wis.:                                                    Page
   Examination and survey-------------------------------------             1262
    Improvement-------------    -------------------                        1207
Manteo Bay, N. C., improvement                                              460
Mantua Creek, N. J.:
   Improvement_-----------------------------                                324
    Review of reports___-----------------------------------------------342
Maps and charts, northern and northwestern lakes                    -------                1775
Marais des Cygnes River, Kans., examination                                                 004
                                                                                           1___________-___
Mare Island Strait, Calif., improvement_                                                   1435
Mariposa Creek, Calif., examination for flood control            --                        1473
Marmarth, N. Dak., flood control at -_                                                     1021
Marquette Bay and Harbor, Mich.:
    Construction of harbor of refuge in bay        _______1166
   Improvement of harbor__-----------------------------------------                        1168
Marshy Hope Creek, Md., examination and survey______________--  -                           385
Marthas Vineyard, Mass., improvement_                                                        86
Matanuska River, Alaska, examination for flood control_________________                    1607
Matapeake, Md., examination and survey of channel at_________________                       384
Matawan Creek, N. J.:
    Improvement ------------------------------------                                   -    276
    Review of reports_ __         __ __                                                     277
Mattaponi River, Va., improvement--------         _----------___                            414
Mattituck Harbor, N. Y., improvement-------------------- -----------                        158
Maumee Bay and River, Ohio, improvement of Toledo Harbor                                   1326
Maurepas Lake, La., waterway via, review of reports_                                        770
Maurice River, N. J., improvement_-------------------------------------                     341
Mayaguez Harbor, P. R., improvement________________                           ______       1628
McCreadys Creek, Md., examination and survey                          -------               385
Meachims Creek, Va., examination and survey                                                 423
Meherrin River, N. C., improvement___------------------                                     452
Melbourne Harbor, Fla., improvement_________------------586
Memphis Harbor, Tenn., improvement of Wolf River_                                           881
Memphis, Tenn.:
     Engineering district --------------------------------------                            865
     Flood control at----------------------------------------                               888
Menominee Harbor and River, Mich. and Wis., improvement                                   1178
Meredosia Bay, Ill., examination and survey_                            ---------          990
Mermentau River, La.:
    Improvement, including tributaries------------------------------                       758
    Improvement of waterway to Franklin, La                                        -    -  751
    Improvement of waterway to Sabine River via ---------------------                      745
    Review of reports------------------------------------770
Merrimack River, Mass.:
    Examination and survey------------------------                                          77
    Flood control at Haverhill, Mass __                    ____________                     72
    Flood control at Lowell, Mass             _________                                     74
    Improvement--------------------------                                                   70
Merrimack River, N. H. and Mass.:
   Flood control-------------------                 --      --------------                  76
   Review of reports--------------------------------- ----------                            77
Metlakatla Harbor, Alaska, examination and survey________-                        _____   1607
Mexico Bay, N. Y., review of reports----------------------------------__                  1401
Miami and Erie Canal, Ohio, .examination and survey ----------- ___--                     1094
Miami Beach, Fla., beach erosion study _____________________________-1774
Miami Canal, Fla., examination and survey ____________________________                      643
Miami Harbor and River, Fla.:
    Examinations and surveys_                                                   642
    Improvement of harbor-------- -----------------------------------           596
    Improvement of intracoastal waterway to Florida Bay, Fla            -       6_____-
                                                                               601
    Improvement of intracoastal waterway to Jacksonville, Fla                   582
    Improvement of river---------------------------------------------           640
Miami River, Oreg., examination and survey_______________ ___                 1526
Mianus River, Conn. :
    Examination and survey----------------                        _ _...        139
    Improvement       -----                                                     129
                                                                          _-----_
                                                INDEX                                            1811
                                                                                                    Page
Michigan City Harbor, Ind., improvement--------------------------                                   1283
Michigan Lake:
    Canal to Sturgeon Bay, improvement--        ----------------------                             1195
    Discharge---------------------------__ ---------------------------                             1775
   Elevation---------------------------------------------------                                    1776
     Examination and survey of harbor of refuge------                                              1287
    Examination and survey of waterway to Grand Rapids                                           1262
     Surveys, charts, etc----------------------------------------- 1775, 1777
    Water levels ------------------------------- ------------------1776, 1778
Middle River, Calif., improvement --------------------------                                     1464
Middle River, Md., examination and survey--------------------------                               385
Miles Creek, Calif., examination for flood control----                            -              1473
Milford Harbor, Conn.:
    Examination and survey----------------------------------------                                139
    Improvement----------------------------------------------------                               113
Milford Haven Harbor, Va., improvement------------------------------410
Milk River, Mont., flood control----------------------                  ----                     1029
Mill Creek and South Slough, Ill., improvement--                                                   951
Mill Creek, Md., examination and survey                                                            385
Mill Creek or River, Conn.:
    Improvement of New Haven Harbor-----------------------                                        111
    Improvement of Stamford Harbor                        --------                                124
Mill Creek, Tex., examination and survey                                                           827
                                                                                                   8-------------------
Mill Creek, Va., improvement                                                                       4---------------------
Miller Bay, Wis., examination and survey                                                          262
                                                                                                 1----------------------
Milwaukee, Wis.:
    Engineering district --------------------------------------------                            1176
    Improvement of harbor------------------------------------------1216
    Review of reports----------------------------------------------1262
Mineral Wells, Tex., engineering district-----------------                          ----          828
Mingo Creek, S. C., improvement                                                                     40
                                                                                                   5---------------------
Minim Creek-Estherville Canal, S. C., improvement                                                  521
Mining, hydraulic, in California- -                                  -                           1649
Minnesota River, Minn.:
    Flood control                 ----------------                                       --       968
     Improvement----------------------------------------                                          964
Miscellaneous civil works------------------                                     -                1762
     General statement regarding                                                                    12
Mispillion River, Del., improvement ------------------------------------                          311
Mississippi River:
    Examinations and surveys:
         For flood control                                                                -      1149
         Illinois and Mississippi Canal---------------------------------                          957
         Missouri River to Minneapolis, review of reports------------- 957, 969
         New Orleans, La., to Apalachicola River, Fla., waterway .......                           714
         New Orleans, La., vicinity of                                                            770
         To intracoastal waterway-------------------------------------                             770
         Waterway to Black River, Ark. and Mo -------                      _________-__            893
         Waterway to Cumberland Sound, Ga------------------------                                 567
    Experiment station, Waterways, Vicksburg, Miss -------------- 1677, 1745
     Flood control, emergency work on tributaries----------------------1690
     Flood control on upper Mississippi River----------------------- 912, 954
     Improvements :
         Baton Rouge to New Orleans, La------------------------------                              724
         Head of Passes to Ohio River (Mississippi River Commission)__ 1667
         Illinois and Mississippi Canal, Ill------------------------------                        946
          Missouri River to Minneapolis---------------------------------                           916
         Missouri River to Ohio River ___                    _________----_______---------         900
         New Orleans, La., to Corpus Christi, Tex., intracoastal water-
            way------------------------------------------                                     745, 779
          Passes:
              Head of, to Ohio River-----------------------------------                          1667
              South Pass----                               ------                                 716
              Southwest Pass, including shoals between Cubits Gap and
                 Head of Passes -------                     ----------------- --            -      716
1812                                   INDEX

Mississippi River-Continued.
    Improvements-Continued.                                                   Page
         Reservoir dams at headwaters -____0------0----     -________       -_ 958
         Sabine River, waterway to------------------------------------         745
    Levees, Head of Passes to Cape Girardeau, Mo---------------------1724
    Mapping alluvial valley_____       ___-------       ________    ___---1699
    Removing wrecks---------------------------------                  --      1667
    Snag boats below Missouri River, operation of_________________             907
    Tiptonville to Obion River, Tenn., flood control-------------------        888
                               -
    Towboats --_-__-___________-___---                                        1757
Mississippi River Commission:
    Improvement of Mississippi River by_____----------     --------           1667
    Report of President ----------------------------------------------        1693
Mississippi Sound, Miss. and Ala.:
    Gulfport Ship Island Channel and Ship Island Pass, improvement_--          706
    Improvement of intracoastal waterway via------------------------           665
Mississippi, State of, removal of water hyacinths from waters of         ---
                                                                          680, 765
Missouri River:
                    ----------------------------------------------
    Flood control_______      ________                                   002, 1019
    Improvement :
         At Fort Peck, Mont ___             _   ---------------                     1022
        At Niobrara, Nebr., flood control_________________________        ___ 1018
                       _
        General__------------------------------------------------------           90
        Kansas City to mouth ______________________________991
        Kansas City to Sioux City----------------           --       ----       1005
        Sioux City to Fort Benton _________________---_____-------             1015
   Review of reports       --------------------------------------- 1021, 1030
Mobile, Ala., engineering district_________________--- __________                644
Mobile Bay and Harbor, Ala.:
   Improvement of harbor and bar                                                   77
                                                                                 6-------------------
   Improvement of intracoastal waterway to New Orleans, La_____---               665
   Improvement of intracoastal waterway to Pensacola Bay, Fla            --------663
   Review of reports---------------------------------------------           714, 715
Mobile River, Ala., removing the water hyacinths in river and tributaries_       680
Mobile River Basin, flood control______________________          _______         713
Mohawk River, N. Y., review of reports_____                                        43
                                                                                 2_____________
Mokelumne River, Calif., improvement            __________________147
Mona Lake, Mich., examination and survey-------- --------------------- 1262
Monhegan Harbor, Maine, examination and survey                        _   77
Monongahela River, W. Va. and Pa.:
   Bank protection--_______________                                     1093
   Examinations and surveys --------------------------------------- 1094
   Improvement ---      ___--__------___                                1072
Monroe Bay and Creek, Va.:
   Improvemenrt-__--------------------------------------------------_    394
    Review of reports________-          _________________                            423
Monroe Harbor, Mich.:
   Improvement                                                                      1---------------------
    Review of reports                                                                332
                                                                                    1------------------------
Montauk Lake Harbor, N. Y., examination and survey_________________                  243
Monterey Harbor, Calif.:
    Examination and survey --------------------------                               1450
    Improvement           --------------------------------------                    1448
Morehead City Harbor, N. C.:
    Improvement --------------------------------------                               494
    Review of reports-------------------------------                                 513
Moriches Inlet, N. Y., examination and survey_____________-___________               277
Mormon Channel, San Joaquin River, Calif., improvement ------------                 1455
Morris Cove, New Haven Harbor, Conn., improvement-- ----------------                 111
Morristown Harbor, N. Y., improvement________________________                       1396
Morro Bay, Calif., review of reports__________________________________              1423
Mosquito Lagoon, Fla., examination and survey of waterway to Banana
River, Fla--------------------------------------------------------641
Mud Lake, Mermentau River, La., improvement -----         -       ---                758
Mulberry Creek, Va., improvement---               ___                                404
Multnomah Channel, Oreg., improvement--------------                                 1500
                                                 INDEX                                      1813
                                                                           Page
Muncie, Ind., flood control at---------------------------------------- 1147
Murderkill River, Del., improvement----------------------------------310
                                         -----
Muskegon Harbor, Mich., improvement____________          __________---    1239
Muskingum River, Ohio:
   Improvement---------------------------------------------------         1095
    Review of reports_ _____-_--------------                              1111
Muskingum River Valley Reservoirs, Ohio, construction-----------------1098
Myers Chuck Harbor, Alaska, examination and survey______________---       1607
Myrtle Beach, S. C., anchorage basin, review of report _______-----------  541
Mystic River, Conn., improvement___ ________       -_________-      __      129
Mystic River, Mass.:
    Improvement     ______________                          _____            44
    Review of et---------------------------------------------
    IRvemf                                                                   447
                 reports___                -77



                                                       N
Nandua Creek, Va., improvement-------------------------------------   380
Nansemond River, Va., improvement__-----------______463
Nantasket Beach Channel, Boston Harbor, Mass., improvement ----------  48
Nantasket (Hull) Gut, Mass., examination and survey_______-___         77
Nanticoke River (including Northwest Fork), Del. and Md.:
    Examination and survey------------------                  ---     385
    Improvement --------------------------------------------- --- 356,380
Nantucket Harbor  and Sound, Mass.:
    Construction of harbor of refuge------------------------------     82
    Improvement of :
           Cross Rip     Shoals           --------------                                         85
           Pollock Rip Shoals---                                                  -              79
Napa River, Calif., improvement__                                                             1437
Naples Bay, Fla., examination and survey                        --                              642
Narrows of Lake Champlain, N. Y., and Vt., improvement---------------                          221
Nashua River at Fitchburg, Mass., flood control------------------------                          71
Nashville, Tenn., engineering district                                                         031
                                                                                              1-----------------------
Natalbany River, La., improvement__________                  -733
National Recovery Act funds, work accomplished with_                      __________       1750
Navesink (North Branch of Shrewsbury) River, N. J., improvement-__-.                        269
Navidad River, Tex., examination and survey--------------------------827
Navigable waters.     Sce Bridges; Rivers and harbors; Wrecks; and
  Regulations.
Navigation, Congresses of, Permanent International Association ____.                      1758
Navigation, surveys for ------------------------------------------                        1637
Nawiliwili Harbor, Hawaii:
    Improvement---------             --------------------------------------- 1614
    Review of reports----------------------------------------------_                      1622
Neah Bay, Wash., review of reports --------------------------------- 1607
Neale Sound, Md.:
    Examination and survey ----------------------------------------- 423
    Improvement ----------------------------------------------------                        395
Necanicum River, Oreg., examination and survey_                                           1526
Neches River, Tex.:
    Examination and survey ---------------------------------------                          827
    Improvement of Sabine-Neches Canal------------------------------- 773
Neebish Channels, St. Marys River, Mich., improvement                                     1----------------288
Nehalem Bay and River, Oreg.:
    Examination for flood control ------------------------------------- 1526
    Improvement of bay                                                                    1-----------------------
Neponset River, Mass., improvement ___________...                    ______           -__    70
Neuse River, N. C.:
    Examination and survey -----------------------------------------                        513
                         -
    Improvement-.. ___._---                       -----                      -_             475
Newark Bay, N. J., improvement-------------------------------------                         244
New Bedford Harbor, Mass.:
    Improvement -----------------------------------------------------
                    .                                                                        88
    Review of reports-        - -         -       - _,_- --        --   -    -   -    -     139
New Buffalo, Mich., examination and survey-----------                               _     1287
1814                                       INDEX
Newburyport Harbor, Mass.:                                                                           Page
   Improvement---     ---------------------------------------                                -         39
   Review of reports-------------------------------------------                                        78
New Harbor, Maine, improvement __________________--_______                                             33
New Haven Harbor, Conn.:
   Improvement___                                                                                     111
      Review of reports-------                                     -----------                        139
New Iberia, La., to Gulf of Mexico, examination and survey __ ____----             -     -   770
New Jersey and New York Channels, improvement--------------------247
New Jersey internal waterway, examination and survey __________---_                          342
New Jersey-Staten Island Channels, N. Y. and N. J., improvement                       -- -   247
New London Harbor, Conn.:
   Improvement----_---------------------------------------                                   102
   Review of reports----_             -----------------------------                      --  139
New Orleans, La.:
   Engineering district, first         ------------------------------------                  716
   Engineering district, second----------------------------------                            771
   Examination and survey of waterway to the Apalachicola River, Fla_                        714
   Improvement of intracoastal waterway in Louisiana and Texas, ex-
      tending to Corpus Christi, Tex_ _------------------------------- 745
   Improvement of intracoastal waterway to Mobile Bay, Ala                                   665
   Improvement of Mississippi River to Baton Rouge, La .............                         724
   Review of reports-------                ---------------------------                       770
Newport Bay, Calif.:
   Improvement       ----------------           ----------------------------                1407
   Review of reports         ----------------------------------------                       1423
Newport Beach, Calif., beach-erosion investigation                                 --       1775
Newport Harbor, R. I.:
   Improvement -------------------                        -------------------                  095
   Review of reports                                     -------------------------            139
Newport News, Va.:
   Improvement of channels to--------                        --------------------                     463
   Review of reports on Salters Creek__                    ______________________                     464
Newport River, N. C., improvement of waterway between Beaufort and
New River--     ------------------------------------------------                                     488
New River, Inlet and Sound, Fla.:
   Improvement of Intracoastal Waterway, Jacksonville to Miami, Fla.,
     via                   __      ----------------------                                             582
   Review of reports---              --------------------------------------                           642
New River Inlet, N. C., review of reports                        --          --------                 513
New River, N. C.:
   Improvement-----------------------------                                                           488
   Improvement of waterway to Swansboro and Beaufort -488
   Review of reports--               -------------------------------------                            513
New River, W. Va., construction of Bluestone Reservoir___________                                    1066
New Rochelle Harbor, N. Y., improvement______----____________                                         145
Newtown Creek, N. Y.:
   Improvement                                                                                         88
                                                                                                      1-------------------
   Review of reports_____________________-------------------                                          243
New York and New Jersey Channels, improvement                                                         247
New York Bay and Harbor, N. Y.:
   Ambrose Channel, improvement_ _______________________-                          __                 170
   Anchorage Channel, improvement ___________________                          ___                    170
   Arthur Kill, improvement ------------------------------------                                      247
    Battery, the removal of shoal in Hudson River off Pier A ----                                     194
   Bay Ridge Channel, improvement_________________________________                                    177
   Bayside Channel, improvement                                                                       170
   Bronx River, improvement_                                                                          151
   Buttermilk Channel, improvement_                                                                   181
    Channel, Staten Island-Hoffman and Swinburne Islands                         -----------           70
    Coenties Reef, removal ...........-                                                               184
    Coney Island Channel, improvement                       ---------------------                     174
    Coney Island Creek, improvement--                    ------------------------                     175
      Craven Shoal, improvement_---  --    ---                     ---                  -_ ---         170
      Drift, collection and removal_-___----                ----                 ----            198, 1764
      East Chester Creek, improvement_-------------.                                                  147
                                      INDEX                                     1815
New York Bay and Harbor, N. Y.-Continued.                                        Page
    East River, improvement, including Coenties Reef _______ ___-          -      184
    Flushing Bay, improvement_------ ---- _________              _153
    Gedney Channel, improvement______________________                             170
    Gowanus Creek Channel, improvement-----------------------------               180
    Great Kills, Staten Island, improvement -------------------------             260
    Harlem River, improvement---------------------------------------              191
    Hell Gate, East River, improvement--------------------------------184
    Hudson River Channel, improvement --------------------------                  194
    Hutchinson River (East Chester Creek), improvement --------------             147
    Kill Van Kull, improvement------------------------------- -------             247
    Main Ship Channel, improvement--------------------------                      170
    New Jersey-Staten Island Channels, improvement------                          247
    Newtown Creek, N. Y., improvement----------- ---------------------            188
    Oil pollution, New York Harbor----------------------------------1764
    Red Hook Channel, improvement----------------------------------177
    Review of reports --------------------------------------------           243, 277
    Shooters Island Channel, improvement _______________________                  247
    Staten Island-Hoffman Island-Swinburne Island Channel       ----- -------     170
    Staten Island Sound, improvement-------------.______-                         247
    Supervision, to prevent destructive or injurious deposits ______             1764
New York engineering districts:
    First ---------------------------                                             14
    Second ---------------------------------------------------------              244
New York State Barge Canal, N. Y.:
    Enlargement-----------------------------------------------                    213
    Examination and survey-----------------------------------------1402
New York State canals, surveys and charting of natural navigable waters_ 1775
New York State, streams, examinations and surveys ____________________            243
Nezpique Bayou, La., improvement -------------------------------------            758
Niagara Falls:
    Preservation of Falls and permits for water-power diversions-_-_-            1781
    Supervision by the Federal Power Commission----------------------            1760
    Supervision of power companies                  ______________________       1781
Niagara River, N. Y.:
    Black Rock Channel and Tonawanda Harbor, improvement           ----------    1373
    Buffalo Harbor, improvement------------------------------------_             1367
    Control and regulation of water of, and preservation of the Falls---.        1781
    Improvement ---------------------------------------------------               380
    Surveys, etc---           ----------------------------------                 1775
Nicaraguan Canal, survey -------------------------------------------             1759
Nicolet Lake (Hay Lake) Channel, St. Marys River, Mich., improvements_ 1288'
Niobrara, Nebr., flood control at _                                              1018
Nissequogue River, N. Y., examination and survey-----------------------           243
Noank Cove, Conn., examination and survey----------------------------139
Nolin River, Ky., improvement---------------------------------                   1136
Nome Harbor, Alaska, improvement              --------------------               1594
Nomini Bay and Creek, Va., improvement-------------------------------420
Nonconnah Creek, Tenn., flood control_______________________________              888
Norfolk Harbor, Va.:
    General improvement, including main channel of Elizabeth River and
      portions of southern, eastern, and western branches---------------          424
    Improvement of channels to Newport News _______________________               463
    Improvement of Scotts Creek, Va----------------------------------             424
    Improvement of Thimble Shoal_-----------------------------------              428
    Improvement of waterway to Beaufort Inlet_                                    447
    Improvement of waterway to sounds of North Carolina         ___________       444
    Review of reports-----------------------------------------------              464
Norfolk, Va., engineering district--------------------------------------          424
North Canadian River, N. Mex. and Tex., review of reports                          93
                                                                                  8_____________
North Carolina sounds, improvement of waterway to Norfolk, Va                     444
Northeast Harbor, Maine, examination and survey --------------------               78
Northeast River, Md.:
    Examination and survey_            ---------------                            386
    Improvement _______---------------      --               -         -          349
Northeast River, N. C., improvement ------------                                  506
1816                                            INDEX

                                                                                            Page
North Edisto River, S. C., improvement of waterway via -________-____                        536
Northern and northwestern lakes:
    Discharge      ------------------------------------------------                        1775
    Elevation---        ----------------------------------------------                     1776
    Surveys, charts, etc---------------------------------------1775
    Water levels       ------------------------------------------                    1775, 1778
North New River Canal, Fla., examination and survey-----____-                          642, 643
Northport Harbor, N. Y., examination and survey ________________---243
North Portland Harbor, Oreg., improvement ______.                       _______-   -- _ 1518
Norwalk Harbor, Conn.:
    Examination and survey____-_____-                     __-_____________ --                139
    Improvement -----------------------------------------------                              121
Norwich Harbor, Conn., improvement of Thames River________ -                     ____        103
Noyo River, Calif.:
    Examination and survey _--------------1450
    Improvement---------------------------------------------                               1441
Nueces River, Tex., examination and survey____________       ---------      -827


Oak Bay to Port Townsend Bay, Wash., waterway improvement---------- 1563
Oak Creek, Md., examination and survey of channel to-----------------386
Oakland Harbor, Calif., improvement_________________                                    ___                1430
Occohannock Creek, Va., improvement_______-___                              _____ ___________               380
Occoquan Creek, Va., improvement ---------------------------------                                          420
Ocean City Inlet, Md., improvement_________       --------------------------------                          370
Ocean City, Md., to Chincoteague Bay, waterway, examination and survey                                      386
Ochlockonee Bay and River, Fla., examination and survey---------------714
Ocmulgee River, Ga., improvement_____-__-                               -____                               555
Oconee River, Ga., improvement_                         _____              _____---------___         -    -555
Oconto Harbor, Wis., improvement-----___-_______----___                                                    1261
Ogdensburg Harbor, N. Y., improvement _____________                                  ______       __      1397
Ogleton Lake, Md., examination and survey of channel to---- ----------                                      386
Ogunquit-Perkins Cove, Maine, examination and survey----------------78
Ohio River:
    Examinations and surveys                                                                 _      136, 1149
                                                                                                   1____________
    Flood control               ------------------------------------------                                 1066
    General improvement (open-channel work) ----- _________-----                                           1062
    Locks and dams, construction_               ________-____________                                      1052
Ohmans Creek, Mich., examination and survey                           _____--- ---                         1175
Okeechobee Lake drainage areas:
    Improvement--          -- ------------------------------------------                                     04
    Review of reports___________________--____-___                                                 __641, 643
Oklawaha River, Fla.:
    Examinations and surveys ___          --            __ __---              -----           --            642
    Improvement--                  -----          -- ------------------------------                         576
    Improvement of ship canal across Florida, via-__                   ________________579
Olcott Harbor, N. Y., improvement_______________________________                                           1383
Oldmans Creek, N. J., improvement ________                           -____________                          326
Old River, Calif.:
    Examination and survey ------ ___________                               -         -          -_____ 1473
    Improvement-------------                             ---------------------------                      1469
Old River, Fla., and Ala., improvement of intracoastal waterway, via---.                                    663
Old River (present mouth of Red River), La., removing snags and
  wrecks        -----------------------------------------------------                                       907
Olympia Harbor, Wash., improvement __                         ._______________________                     1566
Omaha, Nebr., engineering district---------------------------------1005
Onancock River, Va.:
    Examination and survey_--                   -----------------------------                          384, 386
    Improvement----------                 ------------------------------------                              367
Onondaga Creek, N. Y., examination for flood control-----------------                                     1402
Ontario Lake:
    Discharge_ ----------------------                                                                      1775
     Improvement of St. Lawrence River to Ogdensburg, N. Y ........       1400
     Surveys, charts, etc_---   - --     -  --   - --      - - 1775, 1777
     Water levels      .--------------- -  --                       1775, 1778
                                             INDEX                               1817
                                                                                   Page
Ontonagon Harbor, Mich., improvement        ---------------------------     1158
Orange County, Calif., beach erosion investigation-----------___________ 1775
Orange River, Fla., improvement ----------------------------------            617
Orchard Beach, Bronx, N. Y., beach erosion investigation --------------___  1775
Oregon Slough, Oreg., improvement__________           _____                 1518
Orowoc Creek, N. Y., examination and survey------------------------243
Osage River, Mo., improvement                                                 9----------------
                                                                               98
Oswego Canal, N. Y., enlargement ---------------------------------           213
Oswego Harbor, N. Y., improvement -------------------------------           1391
Ottawa River, Ohio, examination and survey ---------         -------------- 1332
Otter Creek, Vt.:
     Improvement---------        -------------------------------------       227
     Flood control---    -- -----------------------------------------         232
     Review ofReviw
                reports__________________
                reort--------------------------------------
                    o                                                        243
                                                                             24
Ouachita River, Ark. and La.:
     Examination and survey                                                  864
     Flood control    ----------------------------------------------         855
     Improvement      ----------------------------------------------         834
Owens Creek, Calif., examination for flood control-------------------1473
Oyster Bay, Ala., improvement of intracoastal waterway via_____________      663

                                              P
Padanaram Harbor, Mass., examination and survey___________1____            _   139
Pagan River, Va., improvement________-        -      -   ______      ____-     442
Paint Rock River, Ala., examination for flood control                         1------------------051
Palacios, Tex., examination and survey-      __-       -_______ -_____-_____ 827
Palm Beach, Fla., examination and survey ----------------------          642, 1775
Palo Alto Harbor, Calif., examination and survey__                         _ 1_----------
                                                                               450
Pamlico River, N. C., improvement       ____________________________           469
Pamlico Sound, N. C.:
    Examinations and surveys------------------------------------               513
    Improvement of waterway to Beaufort Harbor--------------------             485
    Improvement of waterway to Beaufort Inlet______________________            447
    Improvement of waterway to Norfolk, Va-----------------------              444
Pamunkey River, Va., improvement _...__________-_____            -         -_ 415
Panama Canal, survey                                                          1----------------------
Parish Creek, Md., improvement-- _____           ----_________--
                                                              -         -_     374
Parker River, Mass., examination and survey__ ______________________             78
Pascagoula Harbor and River, Miss.:
    Examination and survey                                                     715
    Improvement of harbor--     _________-_____________-___                    701
    Improvement of river above mouth of Dog River------------------            703
Pasquotank River, N. C., review of reports______________________________       464
Passaic River, N. J.:
    Examination and survey                                                       77
                                                                               2---------------------
    Improvement------------------          ---------------------------- 244
Passamaquoddy tidal power project -------------------------------               29
Pass Cavallo, Tex., channel to Port Lavaca:
    Examination and survey -------------------------------------
                                      _                                        827
    Improvement---------------------------                                          814
Pass Manchac, La.:
    Examination of waterway via---------------------------------770
    Improvement        ----------------------------------------------              732
Patapsco River, Md., improvement of Baltimore Harbor and Channels ___              344
Patuxent River, Md., improvement--___----      _    ----------        ---          420
Pawcatuck River, R. I. and Conn., improvement                                      1---------------------
Pawtucket (Seekonk) River, R. I., improvement-----------------------                98
Peace River, Fla., examination and survey------------            -    ____         641
Pearl River, Miss. and La.:
    Examination and survey_                                                         7---------------------
    Flood control        -----------------------   ---  -----------------           714
    Improvement- ---                              --                     -711
    Improvement of East Pearl River__                  ---------------              711
1818                                        INDEX

Pecan Island to White Lake, La., waterway:                                                     Page
    Examination and survey_____---- ---.--.---                         -- -     _______         771
    Improvement----------------------------------------------------                             757
Peconic River, N. Y., improvement-------------------------------------161
Peedee, Great, River, S. C.:
    Examination and survey___________5-----------------------------------------                  41
    Improvement      _____--------------------------------------------                          519
Peekskill Harbor, N. Y., improvement ------------------------------                             203
Pelham Bay (Orchard Beach), Bronx, N. Y., beach erosion investigation                          1775
Pembroke Creek, N. C., examination and survey___                            ___-____-----       464
Penobscot River, Maine:
    Examination for flood control---------------------------------                               7
    Improvement-----------------------------------------------------                             31
Pensacola Bay and Harbor, Fla.:
     Improvement of harbor ------------                                                         673
     Improvement of intracoastal waterway from bay to Mobile Bay, Ala __                     663
         Review of reports__________                 ______________________                  715
     Improvement of waterway to Choctawhatchee Bay, Fla------------_                         662
Pensaukee Harbor, Wis., improvement _____________________                            ___    1181
Pentwater Harbor, Mich., improvement-------------------------------                         1243
Perdido Bay, Fla. and Ala., improvement of intracoastal waterway via__                       663
Perdido River,- Fla. and Ala., examination and survey of waterway con-
  necting Tombigbee and Alabama Rivers_------------------------------                        715
Pere Marquette Lake, Ludington Harbor, Mich., improvement_                                  1245
Perkins Cove, Maine, examination and survey---------------------------                         78
Permanent International Association of Congresses of Na;vigation___                         1758
Permits:
     For construction of bridges----------------                                       -    1762
     For diversion of water from Niagara River, N. Y.------------------ 1781
     For private structures and operations in navigable waters                   ---....-   1762
Perquimans River, N. C., improvement                                                         463
Peru levees, Ind., flood control                                                            1146
Petaluma Creek, Calif., improvement-----------------------------                            1439
Petersburg Harbor, Alaska, improvement_                                                     1587
Petersburg, Va., improvement of Appomattox River                             __              439
Petit Anse Bayou, La.:
     Improvement ----------------------------------------------------                        755
     Review of reports_                                _                                     770
Petit Jean River, Ark., examination__               _                                        893
Petoskey Harbor, Mich.:
     Examination and survey                                                                 1---------------------
     Improvement_---------------------------------------------------_                       1261
Philadelphia, Pa.:
     Engineering district----------------------------------------------                       277
     Improvement of Delaware River at--------                        ________-------     278,284
Phoebus, Va., improvement of channel to Hampton Roads---------------436
Pierhead lines, establishment__--------____________                                            1762
Pigeon (Little) and French Broad Rivers, Tenn., improvement -.-.         1048
pigeon Bayous, La., improvement--------------------------------------768
Pine Bluff, Ark., improvement of Arkansas River at_-                      865
Pine River Reservoir, Minn., construction __________________________      958
Pirates Cove Channel, Fla., review of reports __________________________  642
Pithlachascotee River, Fla., examination and survey__                      6_____________
                                                                          642
Pittsburgh, Pa., engineering district_____________________               1072
Plain Dealing Creek, Md., examination and survey of channel to                    --.....       386
Plaquemine Bayou, La., improvement of intracoastal waterway, via---.                            745
Plaquemine Brule Bayou, La., improvement --                        _                            760
Plattsburg Harbor, N. Y., improvement__________________________-                                227
Playa del Rey Inlet and Basin, Venice, Calif., review of report --                             1423
Pleasantville to Atlantic City, N. J., waterway, examination and survey__                       343
Plum Island River, Mass., examination and survey___________-         _____                       78
Plum Point Creek, Md., examination and survey----------------------                             386
Plymouth Harbor, Mass.:
     Improvement-     __-__--------                                                                O70
     Review of reports-    - __     ---    ----     - --                                          78
                                            INDEX                                         1819
Pocomoke River, Md.:                                                                     Page
     Examinations and surveys              --------------------------------               386
      Improvement-----------:--              ------------------------------               363
Poe Reef Shoal, Straits of Mackinac, Mich., improvement------------_                    1296
Point Chugae, Dauphin Island, Ala., examination and survey-----------                     715
Point Judith, R. I., harbor of refuge, improvement__________ _________                    129
Point Lookout Harbor, Mich., review of reports              ---------------------       1332
Pokegama Reservoir, Minn., construction            ---------------------------            958
Pollock Rip Channel, Mass., improvement___________________________                         79
Pollution of navigable waters, New York Harbor-------------------                       1764
Polson Bay, Flathead Lake, Mont., improvement____------ ----                     ____ 1598
Ponce de Leon Inlet, Fla., review of reports________________________                      642
Ponce Harbor, P. R., improvement-----------------------------                           1626
Ponchatoula River, La., improvement_           --      __--____________                   733
Pontchartrain Lake, La., review of reports____- --------------                  __-       770
Poquonock River, Conn., improvement ____-_____________-_____                              117
Portage Creek, Ala., improvement of intracoastal waterway via               ----------     63
Portage Lake harbor of refuge, Mich., improvement ------------------                    1251
Port Alexander, Alaska, improvement----------------------------                         1598
Port Allen Harbor, Hawaii:
     Examination and survey--------------------------------------1622
     Improvement---------------------------------------------                           1616
Port Angeles Harbor, Wash., examination and survey -----------------                    1607
Port Aransas, Tex., improvement                                                           816
Port Arthur Canal, Tex., improvement-----------------------------773
Port Austin Harbor, Mich., examination and survey------------------1332
Port Bolivar, Tex., improvement of channel to__--____---__------                          793
Port Chester Harbor, N. Y., improvement____________________________                       140
Port Clinton Harbor, Ohio, improvement_ ........        __-__---------_                 1329
Port Everglades, Fla.:
     Improvement ----------------             -----------------------------               594
     Review of reports-_--- --------------                                                 42
Port Frederick, Alaska, examination and survey__               _____________            1607
Port Gamble Harbor, Wash., improvement __..____-_________                               1564
Port Henry Harbor, N. Y., improvement_                                                    227
Port Huron, Mich., improvement of Black River at--                    __--------1315
Port Jefferson Harbor, N. Y., improvement_---__-__             __ --         --
                                                                         ______       -__ 227
Portland and Louisville Canal, Ky., enlargement___1__________________                     052
Portland Harbor, Maine:
     Examination and survey--------------------------------------78
     Improvement-----           -----------------------------------------                  70
Portland, Oreg., engineering districts:
     First                                                                              1----------------------
     Second--------           -----------------------------------------                 1527
Port Lavaca, Tex., channel to Pass Cavallo:
     Examination
           Examinaion and survey________________
                      an surve       -------------------------------------                82
                                                                                          827
     Improvement-----            ----------------------------------------                 814
Port Ontario Harbor, N. Y., examination and survey------------------                    1402
Port Orford, Oreg., review of reports------------------------------                     1526
Port Sanilac Harbor, Mich., examination and survey-_                                    1332
Port series reports__----------------------------------------------                        27
Portsmouth Harbor, N. H., improvement____________________________                          70
Port Townsend Bay to Oak Bay, Wash., waterway improvement- -- _____ 1563
Port Washington Harbor, Wis., improvement_____              _______________ 1213
Port Wing Harbor, Wis., improvement ----------------------------                        1175
Possum Kingdom Dam and Reservoir, improvement-------------------828
Potomac River:
     Examination for flood control_         _____-____-              -_______________ 423
     Flood control        ------------------------------------------                      421
     Improvement at Alexandria, Va-------------------------------420
     Improvement at Washington, D. C_____________                                    387, 391
     Improvement below Washington, D. C---------------------------                        392
Powder River, Oreg., examination for flood control______________________                1551
Power companies at Niagara Falls, N. Y., supervision of
Power, water. See Water power.
                                                                    -------------       1781
Presque Isle Harbor, Marquette, Mich., improvement ---------                                1166
1820                                        INDEX

                                                                                              Page
Presque Isle Peninsula, Erie, Pa., improvement_-___ _                         -_______---1361
Presumpscot River, Maine, examination and survey---------
Prince of Wales Island, Alaska, examination and survey of ship canal
                                                                            ------------      78

   across--------         -----------------------------------------                        1607
Private structures and operations in navigable waters, permits for .....                   1762
Providence Harbor and River, R. I.:
     Examination and survey -----------                                                     139
     Improvement-----------------------------------------------------                         96
     Improvement of Pawtucket (Seekonk) River--__                                             98
                                                                                 -____________--
Providence, R. I., engineering district _______________________
Provincetown Harbor, Mass., improvement_--           ....-
                                                                                     ___
                                                                       ___ ___- -___-70
                                                                                              79

Public Works program, works included, to October 15, 1937--------                              7
Puerto Rico:
     Construction of roads and bridges                                                       635
                                                                                           1---------------------
     Engineering district ---------------------------------------------                    1622
     Improvement of San Juan Harbor--------------------------------                        1622
     Reclamation of swamp areas' ___________                  _________-----------1636
Puget Sound, Wash.:
     Improvement of, and tributaries____________________________                           1561
     Improvement of Lake Washington Canal__ ______________----____                         1573
     Review of reports-----------------------------------------------1607
Pughs Channel, N. C., examination and survey                                                513
Pungo River, N. C., improvement of Belhaven Harbor________________ _                        466
Pungoteague Creek, Va., review of reports______________________________                     386
Purchase or condemnation of easements, Lake of the Woods, Warroad
  River, and Rainy River__-----------------------                               ---        1783
Purification of water supply at Washington, D. C                   -----------------       1748
Put-in-Bay Harbor, Ohio:
     Examination and survey -----------------------------------------                      1332
     Improvement ----------------------------------------------                            1328
Puyallup River, Wash.:
     Flood control ------------                -------------------------------             1599
     Improvement of Tacoma Harbor________________________________                          1568

                                                Q
Quantities of work done----------------------------------------------    5
Queens Creek, Va., examination and survey ______-___-     --
                                                         ______-____-  423
Queenstown Harbor, Md., improvement----------------------------        380
Queue de Tortue Bayou, La., improvement------------------------------  768
Quillayute River, Wash., improvement_--___-- -____                    1560
Quincy Bay, Ill., review of reports_--------------------               957
Quinnipiac River, New Haven, Conn., improvement____________ ____       111

                                                R
Raccoon Creek, N. J., improvement________________________                                      327
Racine Harbor, Wis.:
    Improvement ------------------
                      _                                                     1219
    Review of reports_-----------------------                               1262
Rahway River, N. J., improvement ---------------------------------           257
Rainy Lake, survey operations---------------------------------------1776
Raisin River, Mich., improvement of Monroe Harbor __________________ 1322
Rappahannock River, Va., improvement                                         400
Raritan Bay and River, N. J.:
    Improvement of channel to Arthur Kill------------------------            254
    Improvement of bay----------------------------------------------247
    Improvement of river_______________________________-__                   261
Red Hook Channel, New York Harbor, N. Y., improvement --------------          177
Redondo Beach Harbor, Calif., examination and survey_________               1423
Red River, La., Ark., Tex., and Okla.:
    Cypress Bayou and lakes to Jefferson, Tex., improvement ------------     831
    Examinations and surveys----------------------------------------864
    Flood control --------         --- -- ----------------                -854

    Improvement below Fulton, Ark---------------_                        ' 829
    Improvement from Fulton, Ark., to mouth of Washita River, Okla --        853
                                         INDEX                                  1821
Red River, La., Ark., Tex., and Okla.-Continued.                          Page,
    Jefferson-Shreveport waterway improvement ---------              ----  831
    Rectification of mouth by Mississippi River Commission-------------   1667
Red River of the North Basin, flood control-----------------------------   968
Redwood Creek, Calif., improvement------------------------------          1426
Regulations and rules:
    For anchorage grounds_____------------         __-______              1762
    For navigable waters__------------------------------------------1762
    For opening of drawbridges_------------------------------------       1762
Rehoboth Bay, Del., waterway to Delaware Bay, improvement-----------       316
Republican River, Kans., examination--------------------------------       004
Reservoirs:
    Mississippi River headwaters, construction_-----------------------     958
    Tidal Reservoir, Potomac River, D. C-----------------------------      387
    Washington Aqueduct, D. C-------------------------------------        1770
Richardson Bay, Calif., examination and survey-----------------------     1450
Richmond Harbor, Calif.:
    Improvement -- _------------_                                         1-----------------------
                                                                          1433
    Review of reports---------------------                                1450
Richmond Harbor, Va., improvement of James River -------------------- 430
Rigolets, the, La., review of reports------------------------------------  770
Rio Grande, Tex., flood control----------------------                      825
Rio Grande Valley, Tex., review of reports----------------------------- 827
Rivers and harbors:
    Abandonment and curtailment of projects                                762
                                                                          1-----------------------
    Advanced funds for improvement of                             --         15
    Allotments under War Department Appropriation Act of April 26,
       1934     -___         ---------                                            20
    Allotments under War Department Appropriation Act of April 9, 1935_           21
    Allotments under War Department Appropriation Act of May 15,
     1936 ---     -------------------------------------------------                22
    Appropriations for operations during the past year-----------------            14
    Board of engineers for                                                          6
                                                                                   2------------
    Bridges, construction____-         ______           ______---__         -   1762
    Bridges, regulations for opening of draws                                    762
                                                                                1-----------------------
    Contributed funds for improvement of_                                          17
    Cost and financial summary_                          -----------              18
   Estimate of appropriations for ------------------------------------    20
   Expenditures during the past year-----------------
   Harbor lines, establishment --------------------------------------   1762
   Public Works Program on Oct. 15, 1937----------------------------        7
   Regulations for establishment of anchorage grounds----------------1762
   Regulations for opening of drawbridges --------------------------- 1762
   Structures other than bridges, permits for erection----------------- 1762
Roanoke River, N. C.:
   Improvement                     ---------------------------           457
   Review of reports ------------------------------------------------    464
Rochester (Charlotte) Harbor, N. Y.:
   Examination and survey -------------------------------------         1402
   Improvementllt -------------------                                   1384
Rockhall Harbor, Md.:
   Examination and survey-----------------------------------------       38
    Improvement ..................----                                           351
Rockhole Creek and Herring Bay, Md.:
    Examination and survey-----------------------------------               385
    Improvement----------------------------------------------------
    Improvement                                     _    _      _380        380
Rock Island, Ill., engineering district----------------------------------- 946
Rockland Harbor, Maine:
    Improvement -----------------------------------------------------        70
    Review of reports -----------------------------------------------        78
Rockport Harbor, Mass., improvement ---------------------------------        70
Rock River, Ill. and Wis., flood control---------------------------------   956
Rocky River Harbor, Ohio, examination and survey--------------------1402
Rocky River, Ohio, improvement .......-      ___                           1343
Rogers Creek, Va., examination and survey_------------                      423
Rogue River, Oreg., examination for flood control-----------.              1526
1822                                         INDEX

Rollinson Channel, N. C.:                                                                               Page
     Examination and survey -----                   _--_-_----_----
                                                  _----__                                                513
    Improvement _______                                                      __                          471
Rome, Ga., flood control at--------       -----------
                                          _--                                     713
Rondout Harbor, N. Y.:
    Examination and survey-_                  _                    _    __     _  243
    Improvement --------                       ___                    _           205
Rookery Bay, Fla., examination and survey -------------------------               642
Root River, Wis., improvement of Racine Harbor--                                 1219
Rouge River, Mich., improvement                                                  1---------------------
Rough River, Ky., improvement----------------------                              1141
Round Island, Mich., to Mackinac Island, Mich., channel improvement ...          1296
Rouses Point, Lake Champlain, N. Y., improvement -----                   -----    227
Royal River, Maine, review of reports -----------------------------                 78
Rules and regulations:
    For anchorage grounds__________     -       _____________________            1762
    For opening of drawbridges_____________________-                             1762
Russell Creek, S. C., review of reports                       ---------           541
Russian River, Calif., examination and survey-----------------------1450

                                                 S
Sabine-Neches Waterway, Tex.:
    Examination and survey---              ----------------------------------               827
    Improvement-----------------------------------------------                              773
Sabine River, La. and Tex.:
    Examination and survey--------------------------------------                            827
    Improvement of intracoastal waterway to Corpus Christi, Tex                             779------
    Improvement of intracoastal waterway to New Orleans, La----------                       745
    Improvement of Sabine-Neches Canal_____                              __                 773
    Improvement of Sabine Pass Harbor-                                                      773
Sacarma Bay, Fla., review of reports_--                                                     642
Sacketts Harbor, N. Y., improvement                                                        1400
Saco River, Maine:
    Improvement       ----------------------------------------------                         35
    Review of reports--------------------------------------------                            78
Sacramento, Calif., engineering district-__                                                1450
Sacramento River, Calif.:
    Flood control by California Debris Commission-----------------                         1654
    Hydraulic mining                                                                       1649
    Improvement                                                                            1459
    Removal of debris by California Debris Commission__________ 1654, 1663
    Review of reports---          ---------------------------------------                  1473
Safety Harbor, Fla., examination and survey                                                  41
                                                                                            6----------------
Sag Harbor, N. Y., improvement                                                               62
                                                                                            1-------------------
Saginaw Bay    and River,   Mich.:
    Improvement ----------------------------------------------                             1312
    Review of reports             ------------------------------------------               1332
St. Andrews Bay, Fla.:
    Examination and survey-__                       -__-                   ____ --
                                                                       -_______    -__________
                                                                                            714
    Improvement of bay         -----------------------------------------                    668
    Improvement of channel to Apalachicola River .657
St. Augustine Harbor, Fla., review of reports_                                              6--------643
St. Catherines Sound, Md., examination and survey                                     ___   423
St. Clair Flats Canal, Lake, and River, Mich.:
     Gages----      -----------------------------------------------                         778
     Improvement of channels in Lake St. Clair________________________ 1300
     Improvement of St. Clair River-------------------------------                         1297
St. Croix River, Maine:
    Improvement                                                                               70
    Examination and survey--------------------------------------                              78
St. Croix River, Maine and New Brunswick, operations of International
   Board of Control----------------------                                                  1780
St. Croix River, Wis. and Minn.:
     Improvement--           -   --      -    -      --       -     -        -   -        -              962
     Review of reports-                                   -       ---                --             _---- 969
St. Denis Bayou, La., improvement_-                ----                 --                    ---   _-- 736
                                                   INDEX                                                  1823
                                                                                                            Page
St. Francis River, Ark., improvement                  ---------------------------------                      876
St. Jerome Creek, Md.:
      Examination and survey -----------------------------                           --------                423
     Improvement---                   ---------------------------------------                                399
St. Johns River, Fla.:
     Improvement between Jacksonville and Palatka___-------------------                                      640
     Improvement betwee n Palatka and Lake Harney-------------------                                         574
     Improvement, Jacksonville to the ocean--__---_                      --------------------                569
     Improvement of ship canal across Florida via--------------------                                        579
     Improvement of waterway to Beaufort, S. C----------------- 551, 568
     Jacksonville, Fla., to Miami, Fla., waterway, improvement------------582
     Review of reports             -------------------------------------- 513, 541, 567, 643
St. Jones River, Del. :
     Improvement-------------------------------                                      --------------          308
     Review of reports-------------                                                                          343
St. Joseph Harbor and River, Mich.:
     Improvement of harbor--------------------------------                                                  1225
     Improvement of river--------------------------------------                                             1261
     Review of reports-----------------------------------------                                             1262
St. Josephs Bay, Fla.:
     Improvement of entrance                          ------------------------------                         66
     Review of reports-------------------------------------------715
St. Lawrence River:
     Board of control to control the operation of the St. Lawrence Power
       Co., near Massena, N. Y                      --------------------------------- 1782
     Examination and survey-------------------------------                                           ----- 243
     Improvement between Ogdensburg, N. Y., and Lake Ontario---------- 1400
     Surveys and gages__---                                                                         ___________-----------
                                                                                                      1777, 1778
St. Louis, Mo., engineering district---------------------------------                                        899
St. Lucie Canal, Inlet, and River, Fla.:
    "Examinations and surveys--------------------------------- 641, 643
     Improvement of canal and river-_-----------------                                                       601
     Improvement of inlet-
St. Malo Bayou, La.:
                                                                                                              10
                                                                                                             6--------------------
     Examination and survey-----                          ----------------------------                       770
     Improvement _----------------                         ----------------------------                      726
St. Marks River, Fla.:
     Improvement------                    -----------               ---                                      645
     Improvement of waterway to Apalachicola Bay, Fla----------------656
     Review of reports---------------                         ---------------------------- 715
St. Marys River and St. Marys Falls Canal, Mich.:
     Channels and waters connecting the Great Lakes, improvement--.--                                       1288
     Improvement of river at the falls, including Hay Lake (Nicolet Lake)
       and Neebish Channels------------------------------------                                              288
     Surveys, etc------------------------------         -------                                       1775, 1777
St. Marys River, Ga. and Fla.:
     Examination and survey of waterway to proposed Gulf intracoastal
       waterway-----                 --------------------------------------                                  567
     Improvement ----------------------------------                                       ------------ 561
St. Marys River, Md., examination and survey------------------------423
St. Patricks Creek, Md., examination and survey----------------------423
St. Paul, Minn., engineering district-- ------------------------------                                       957
St. Petersburg Harbor, Fla., improvement                                                                     6--------------------
St. Thomas Harbor, Virgin Islands:
     Examination and survey --------                        --------------------------- 1637
     Improvement----------------------------------------------                                             1632
Salem Harbor, Mass., improvement-------------------------------------                                         70
Salem River, N. J., improvement---------------------------------329
Saline River, Ark., improvement -----                      ----------------------------- 853
Salisbury Beach, Mass., beach erosion investigation------------------- 1775
Salmon Falls River, Maine and N. H., review of report ------------------                                      78
Salmon River, Alaska, flood control                    ------------------------------- 1604
Salmon River, Oreg., examination for flood control------------------- 1551
Salters Creek, Newport News, Va., review of reports-------,_                                                 464

        20196-37-pt. 1-- 115
1824                                         INDEX
                                                                                                    Page
Sampit River, S. C., improvement of Georgetown Harbor-__--- _____514
San Antonio Bay, Tex., examination and survey --------------------                                   827
San Diego Harbor and River, Calif.:
    Examination and survey---------------------------------                                     1423
    Improvement of harbor             ----------------------------------                        1403
Sandusky Harbor, Ohio:
    Improvement--------------------------------------                                           1333
    Review of reports --------------------------------                                          1402
Sandy Bay, Mass., harbor of refuge, review of reports____________________                         78
Sandy Hook Bay, N. J.:
    Examination and survey--- -----------------                                    ----------        2177
    Improvement------                -------------------------------------                           268
Sandy Lake Reservoir, Minn., construction --------------------------                                 958
San Francisco Bay and Harbor, Calif.:
    Improvement of harbor--------                       ---------------------------             1424
    Improvement of lower bay-----------------------------------                                 1448
    Improvement of Oakland Harbor ______--------430
    Review of reports--------------------------------------                                         1450
San Francisco, Calif., engineering district --                    ---------                         1423
San Gabriel River, Calif.:
    Examination for flood control___________________                                ________        1423
    Flood control-------              -- -----------------------------------                        1420
Sangamon River Basin, Ill.:
    Flood control             --------------------------                       ---------             988
    Review of reports----------------------                                                          990.
San Jacinto River, Tex., improvement of waterway via________________                                 795
San Joaquin River, Calif.:
    Hydraulic mining__-----                  _______-_______                                        1649
    Improvement                                                                                     1---------------------
    Improvement of Stockton and Mormon Channels ___1455
    Review of reports--14------------                                        -     -------            73
    Work of California Debris Commission_                      ________                             1648
San Juan Harbor, P. R.:
    Improvement---              ----------------------------------------                            1622
     Review of reports-- -------               -         -    -    -     -     -    -       -       1637
San Lorenzo River, Calif., examination and survey                    __________________             1450
San Luis Obispo Harbor, Calif., improvement____________                     ___________             1415
San Pablo Bay, Calif., improvement_                                                                 1435
San Rafael Creek, Calif., improvement___                   __        -____________ _                1440
Santa Ana River, Calif., flood control----------------------------                                  1422
Santa Barbara, Calif., beach erosion investigation                                                   775
                                                                                                    1______________
Santa Barbara Harbor, Calif., improvement_________________________                                  1413
Santa Maria River, Calif., examination for flood control__-----------                               1423
Santa Monica Harbor, Calif., review of reports________________________                              1423
Santa Rosa, Fla., improvement of narrows in sound__________________                                  662
Santee River, S. C., improvement ------------                                _ _                     524
Sapelo Harbor, Ga           ---------------------------------------                                  565
Sarasota Bay, Fla.:
    Examinations and surveys                                                                         6-------------------
     Improvement----      ------------------------------------------                                 622
Sardis Reservoir, Miss., flood control_________________________________                              856
Satilla River, Ga., improvement -----------------------------------                                  560
Saugatuck Harbor, Mich., improvement___ -----------------------------                               1230
Saugatuck River, Conn., improvement___________________________                       __              129
Saugerties Harbor, N. Y., improvement______________________________                                  227
Saugus River, Mass., examination and survey____                                                 -     78
Savannah, Ga., engineering district___ -------------------------------                               542
Savannah Harbor and River, Ga.:
     Flood control     -------------------------------------------                                    566
     Improvement of harbor          --------------------------------------                            542
     Improvement of river above Augusta-                  ----------    _                             565
      Improvement of river at Augusta_________________________________                                565
      Improvement of river below Augusta____________________________                                  546
      Improvement of waterway to Beaufort, S. C------                                                 551
                                                       -
      Improvement of waterway to Fernandina, Fla-................                                     551
      Review of reports----------        --     - -           - -                       -   -         567
                                               INDEX                                             1825
                                                                                                 Page
Saybrook Harbor, Connecticut River, Conn., improvement-------------- 105
Scajaquada Creek, N. Y., review of reports                ------------------------- 1402
Schuylkill River, Pa.:
    Improvement------------------------------------                                               289
    Review of reports--            -----------------------------------------                      343
Scituate Harbor, Mass.:
    Improvement-----------------------------------------------                                     58
    Review of reports-------------------------------------------                                   78
Scotts Creek, Va., improvement of Norfolk Harbor ___________---------424
Scuppernong River, N. C., improvement _______-----                     ---------                  458
Seattle Harbor, Wash., improvement of Duwamish River and east and
  west waterways__-----               --------------------------------------- 1570
Seattle, Wash., engineering district __--_______- -               -___.                          1551
Sebastian Inlet, Fla., review of reports                                                           43
                                                                                                  6---------------------
Seekonk (Pawtucket) River, R. I., improvement __________----------98
Seldovia Harbor, Alaska, examination and survey ------                                     ___   1607
Sennette Bayou, La., examination and survey_                    --- _____-___-___771
Severn River, Md., improvement of Annapolis Harbor ______-----376
Seward, Alaska, construction of harbor of refuge____________________                             1592
Shallotte River, N. C., improvement                 ---------------------------                   511
Shallowbag Bay, N. C., improvement------------------------------ 460
Shark River, N. J., examination and survey________________________                                277
Sheboygan Harbor, Wis., improvement-- -_____ ______                       -     --. ________     1211
Sheepshead Bay, N. Y., improvement________________________----------                              227
Sheffield Island Harbor, Conn., improvement of Norwalk Harbor                        --------     121
Shelby Park, Nashville, Tenn., improvement ________-_________                               ____ 1050
Shelton Harbor, Wash., examination and survey___ -                            -______-__         1607
Shem Creek, S. C., examination and survey____________________________                             541
Ship Island Harbor and Pass, Miss., improvement of pass and channel
  to Gulfport-----------------------------                                           -----        706
Shipyard River, S. C.:
     Improvement _---               -----                      -        ---------                   534
     Review of reports ------------------------------------------                             541
Shoal Harbor, N. J., improvement--          ------------------------------ 267
Shooters Island Channel, N. Y. and N. J., improvement___- ----                    __-    -    247
Shreveport, La., to Jefferson, Tex.:
     Examination and survey__           -_________---__-  -                                   864
     Improvement of waterway_                          -___
                                              -_______________-                               831
Shrewsbury River, N. J., improvement________--------          -     --     ____               269
Siletz River, Oreg., examination for flood control---------------------1526
Silver Lake Harbor, N. C., improvement____--- ------------                                    474
Sinepuxent Bay, Md., improvement_--_-----            _______________                          370
Sinuk River, Alaska, examination and survey___________--_________1607
Siskiwit River, Wis., review of reports------------                       ___________ 1175
Sitka Harbor, Alaska:
     Examination and survey -----------------------------------                              1607
     Improvement--------        -- -----------------------------------                       1588
Siuslaw River, Oreg.:
     Improvement       ---------------------------------------------                         1518
     Review of reports--___-------______                        ___                    1526, 1527
Six Mile Creek, Ark., examination for flood control_ __-______,_____                          893
Skagit River, Wash.:
     Examination for flood control_ ----------------                                __     -1607
     Flood control-----------------------------------------------                            1601
     Improvement -------------------------------------------------- 1598
Skagway Harbor, Alaska, examination and survey___ ___                       __________       1607
Skamokawa Creek, Wash., improvement____-----------                        ______, _          1513
Skamokawa Slough, Wash.. improvement               ----------------------                    1518
Skipanon Channel and River, Oreg.:
     Examinations and surveys____---------------------------                                 1527
     Improvement of channel_____--                -------------
                                       _____---------                                        1489
Slack-water systems. See Canals and Waterways.
Slaughter Creek, Md., improvement----------------------                                       380
Smallers Drain, Va., examination and survey.--------------------                                    386
Smith Creek, Md., improvement .-----------------------     ----                                   - 420
1826                                      INDEX
                                                                                         Page
Smiths Creek, Pamlico County, N. C., improvement __________________                   477
Smiths Creek (Wilmington), N. C., improvement---------------------508
Smoky Hill River, Kans., examination ----------------------------- 1004
Smugglers Cove, Oreg., examination and survey ____________________                   1527
Smyrna River, Del., improvement_ ________.-.--..-----.._____                          305
Snake River, Idaho, Oreg., and Wash.:
    Improvement        -------------      -------------------------------            1545
    Review of reports--------------------                    --------------------- 1551
Snohomish River, Wash.:
    Improvement                                                                 ----    76
                                                                                     1---------------------
    Improvement of Puget Sound and tributaries---------- ---                         1561
Socastee Creek, S. C., improvement of waterway via                                    491
Soda Lake, La., improvement of waterway via_________________________                  831
Sonoma Creek, Calif., examination and survey ----------------------                  1450
Sorrel Bayou Lock, La., design of--------------------------------                     769
South Canadian River, N. Mex., construction of Conchas Dam and Reser-
  voir _--------------894------------------------------------
Southampton Bay, Calif., examination and survey             ---     ____-________---1450
South Chicago Harbor, Ill., improvement__ -----------------------                    1270
South Haven Harbor, Mich., improvement __-----                   ___________---__    1228
South Pass, Mississippi River, maintenance of channel----------------                 716
Southport Harbor, Conn., improvement----___---------------                   ------- 129
Southport Yacht Basin, N. C., review of reports ____- ____-_______--                  513
South River, N. C., improvement___--_----           ------------------------          511
South River, N. J., improvement-----------------------------------                    264
South Slough and Mill Creek, Ill., improvement                                        951
Southwest Pass, Mississippi River, improvement, including shoals between
  Cubits Gap and Head of Passes, and dredge construction_                             716
Spokane River, Idaho, examination for flood control___________________               1607
Springfield, Mass., flood protection for_ ________                                    135
Spry Island Narrows, Md., examination and survey __                 ___                   385
Squalicum Creek, improvement of Bellingham Harbor, Wash------------                      1580
Stamford Harbor, Conn.:
    Beach erosion study---------------------- ---------------------                      1775
     Improvement --          ---            ------              -         ------          124
     Review of reports-----------------------------------------------13.9
Starlings Creek, Va., improvement-------------------------------------    366
Staten Island Sound (Arthur Kill), N. Y. and N. J., improvement-------    247
Steamboat Slough, Wash., improvement--------------------------------1518
Steele Bayou, Miss., improvement_______    ____ __-_---  -   -   -     -  853
Steinhatchee River, Fla., improvement--        __-_____-_____             636
Stikine River, Alaska, improvement ---------------------------------- 1584
Stilaguamish River, Wash., flood control___________________________      1600
Stillwater Harbor, Minn., improvement of St. Croix River-------------- 962
Stockton Channel, San Joaquin River, Calif.:
     Improvement ----------------------------------------------------     455
     Review of reports_________                                                          1_______--------------
                                                                                          473
Stoney Creek, Md., examination and survey _______________________                         384
Stonington Harbor, Conn., improvement-              __________________________            129
Stonington Harbor, Maine, examination and survey_                                          78
Structures in navigable waters, permits for private structures and opera-
  tions -------------------------------------------------------------                    1762
Stumpy Point to Pamlico Sound, N. C., review of reports________-_____-_                   513
Sturgeon Bay and Lake Michigan Ship Canal, Wis., improvement------__                     1195
Suisun Bay Channel, Calif., improvement -- ____--------          --     -   ____         1466
Suisun Channel, Calif., improvement___-----_______                                       1467
Sunflower River (Big), Miss., improvement_________               ______________           847
Sunken craft, removal of---------------------------------------                          1762
Superior-Duluth Harbor, Wis., improvement_______________               _________         1152
Superior Lake:
     Board of control                       -1782
     Channels in waters connecting Great Lakes, improvements---------                    1288
     Discharge_-_      _                                                                 1775
     Elevation                                                                           1778
                                              INDEX                                          1827
Superior Lake-Continued.                                                          Page
    Surveys, charts, etc        ----------------------------------------         1775
    Water levels                                                  1-------------------------------------
Supervision of New York Harbor, N. Y., to prevent destructive or injuri-
  ous deposits-------------------------------------               -------- 1764
Surface levels. See Water levels.
Surveys :
    Allotment for         ---------------------------------------------          1666
    Flood Control Acts approved June 22, 1936, and August 28, 1937,-             1642
    General statement regarding-       -      --- --        -  ----                 12
    International boundary waters-        ------------------          ---- _ 1775
                                                                     __
    Navigation, flood control, power, and irrigation -_____      __--__--        1637
    Of northern and northwestern lakes                                           1----------------------
Susquehanna River, Pa. and Md.:
    Examination and survey       ---------------------------------          243,386
    Flood  control_________________________
        Flood
           contro        ------------------------------------------- 2638   236,381
    Improvement above and below Havre de Grace, Md----------------                 348
Suwannee River, Fla.:
    Examination and survey --------       -----------------------------            643
    Improvement                                                                    6--------------------
Swampscot, Mass., harbor of refuge, examination and survey------------              78
Swan Quarter Bay, N. C., improvement of waterway from Deep Bay, N. C_              465
Swansboro, N. C., waterway to New River and Beaufort, improvement __-              488
Swift Creek, N. C., improvement---------------------------------                   478
Swinomish Slough, Wash., improvement_             --  ___     _______            1578

                                                  T
Tacoma Harbor, Wash.:
     Improvement               ---------------------------------------------                  1568
    Review of reports         -----------------------------------------                       1607
Tallahatchie River, Miss., improvement                   ___     _-____-__        -__          853
Tampa Bay and Harbor, Fla.:
    Examinations and surveys                  -----------------------------------              643
     Improvement-                         -----------------------------------                   25
                                                                                               6----------
    Improvement of channel to Clearwater Harbor--___----                                    - 631
                                                                                               6______
Tanana River, Alaska, examination and survey_________-_-_                                     1607
Tangier Channel, Va., improvement _________----__--___-_-                                      380
Tangipahoa River, La., improvement-------------------------------731
Tanners Creek, Ind., examination and survey_________                      ___-_______ 1136
Tar Bay, Md., improvement             -------------------------------------                    380
Tar River, N. C.:
    Flood control     ----------------------------------------------                           512
     Improvement!--       --------------------------------------------                         469
    Review of reports-----                ----------------------------------                   513
Tarrytown Harbor, N. Y., improvement___---______                      ------                   201
Taunton River, Mass., improvement--------------------------------                               94
Taylor Creek, Fla., improvement_ ______________-                     ___     __--     -__-     604
Teche Bayou, La.:
    Examination and survey______
     Improvement
                                        -       -     -        -____________
                       ----------------------------------------------
                                                                                 ___     _-    771
                                                                                               742
Tedious Creek, Md., examination and survey______________                                   _   384
Tenakee Inlet, Alaska, examination and survey-_______ ___________                          _ 1607
Tennessee River :
     Improvement       --------------------------------------------- 1038
    Review of reports-------------------------------------------                               715
Tensas River, La., improvement                 -------------------------------- 839
Terrebonne Bayou, La.:
     Improvement      ----------------------------------------------                           768
    Review of reports-------------------------------------------                               771
Terrebonne-Houma Ship Canal, La., examination and survey------------- 770
Terre Haute, Ind., flood control at-----------------------------                              1147
Texas and Louisiana Intracoastal Waterway:
    Improvement, Mississippi River to Corpus Christi ___._,____-                          745, 779
   Review of reports- ----    -----------
                                      _     -----_                                              827
Texas City Channel, Tex., examination and survey- --- -                   ---------             827
1828                                             INDEX

                                                                                                        Page
Texas City Harbor, Tex., improvement of channel to Galveston
Texas, State of, removal of water hyacinths from waters of-
                                                                                        -------   _      790
                                                                                                   6---------80,
                                                                                                         765
Thames River, Conn., improvement--------------------------------                                         103
Thimble Shoal, Chesapeake Bay, Va., improvement -------------------                                      428
Thomaston Harbor, Maine, improvement --------                                                              70
Thoroughfare Bay with Cedar Bay, N. C., channel connecting, improve-
  ment------------------           -----------------                              -------                482
Thunder Bay Harbor and River, Mich., improvement----------------- 1310
Tickfaw River, La., improvement of, including tributaries                                                  33
                                                                                                         7---------------
Tigre Bayou, La.:
     Improvement--------__-- -.                                                                          755
     Review of reports__-----------------------------------------                                        770
Tilghman Island Harbor, Md., improvement ____- -___-______..__                                           380
Tillamook Bay, Bar, and entrance, Oreg., improvement-------------- 1518
Tillamook River, Oreg., examination for flood control                                                   1____________
                                                                                                   _ 1527
Tiptonville to Obion River, Tenn., flood control_______________-_____--888
Tobacco River, Mich., examination and survey----------------------                                      1175
Tohopekaliga Lake, Fla., review of reports_________________________                                      642
Toledo Harbor, Ohio:
     Improvement-- -------------------------------------------                                           326
     Review of reports               ------------------------------------------                         1332
Tombigbee River, Ala., and Miss. :
     Demopolis, Ala., improvement below (construction of locks and dams)                                 690
     Demopolis, Ala., to Walkers Bridge, Miss., improvement ------                                       699
     Review of reports        ----------------------------------------                                   715
Toms River, N. J., improvement-------------- ---------------------                                       341
Tonawanda Harbor, N. Y., improvement                                                                    1---------------------
Topeka, Kans., flood control at------------------------------------1003
Totuskey Creek, Va., improvement ---------------------------------                                       403
Towboats, experimental, for use on Mississippi River-----------------1757
Town River, Md., examination and survey---------------------------                                       386
Town River, Mass.:
     Examination and survey                          ------------------------------                        78
     Improvement---      --------------------------                                                        56
Townsend Inlet, N. J., review of reports__----------------------------- 343
Tradewater River, Ky., improvement---------_______-_                                                    1143
Trask River, Oreg., examination and survey ------                                          _______ 1527
Travers Island, N. Y., examination and survey-----------------------243
Traverse Bay, Mich., review of reports----------------------------- 1262
Traverse Lake, S. Dak., flood control-------------------------------                                     968
Tred Avon River, Md., improvement __-                             -380
                                                      __________-------
Trent River, N. C., improvement----------------------------------                                        481
Trinity River, Tex.:
     Examination and surveys ------------                      ------------------------ 827
     Improvement____________________________                                                   -..       825
Tuckahoe River, Md., improvement__ --------------------------------                                      380
Tuckerton Creek, N. J., improvement--- ---------------------------                                       337
Tug Fork, Big Sandy River, W. Va. and Ky., improvement------------- 1125
Turner Cut, Calif., improvement of Middle River ___________________                                     1464
Turners Cut, N. C., improvement of waterways via _________--                              ____-_         444
Turtle Bayou, Tex., improvement                  ----------------------------------                      825
Turtle Cove, Tex., improvement of waterway via -- ___---------------811
Turtle River, Brunswick Harbor, Ga., improvement_________-__             -____-                          557
Tuscarawas River, Ohio, review of reports_____-- -                   -__-------------                 -1111
Twelvemile Bayou, La., improvement of waterway via--,--------------                                      831
Twin Rivers, Wis., improvement of Two Rivers Harbor _____________                                       1205
Twitch Cove, Md.:
     Improvement-----------------------------------------------                                          364
     Review of reports------ ----------------                                                            386
Two Rivers Harbor, Wis.:
     Examination and survey---------                 -----------------                 ---------- 1262
     Improvement-----------------                       ----------------------------                    1205
Tyaskin Creek, Md., improvement-- ------                          ----------------                        380
Tygart River Dam, W. Va., construction                         --------------------------                1086
                                             INDEX                                                      1829
                                      U
Umatilla River, Oreg.:                                                        Page
    Examination for flood control_________-------------------1551
    Flood control----------- ------- ------------- ------------------ -- 1550
Umpqua River, Oreg.:
    Examination and survey----------------------------------------- 1527
    Improvement---------------------------------------------------            1479
Unalaska Harbor, Alaska, examination and survey-------------------- 1607
Unga Harbor, Alaska, examination and survey-------------------------          1607
Union River, Maine, improvement ___--_______                ___-----------70
Upper Chipola River, Fla., improvement------------------------------           651
Upper Machodoc Creek, Va., improvement--________-----             -----------  420
Upper Mississippi River flood control------------------------------912,954
Upper Thoroughfare, Deals Island, Md.:
    Examination and survey-----------------------------------------            386
    Improvement------------------------------ ---------------------            359
Upper White River, Ark., improvement------         ______------------          879
Urbanna Creek, Va., improvement------__          ----------------              405

                                                   V
Valdez Harbor, Alaska, examination and survey            .  --------                                     1607
Valley Creek, Ala., examination and survey------------- --------                                          715
Vandermere Harbor, N. C., examination and survey                    --------------------                  513
Venice Inlet, Fla., improvement--------------------------                                                  20
                                                                                                          6-------------
Ventura Harbor, Calif., review of reports __________                               ____1423
Vermilion Bay and River, La.:
    Improvement------------          -------------------------------                                      768
    Improvement of intracoastal waterway via________________________                                      745
Vermilion Bayou, La., improvement      ----        -768
Vermilion Harbor, Ohio.:
    Examination and         survey-_                   -------------                                    1402
    Improvement-__.-___________-_-_____                                                                  1338
Vermilion Lock, La., improvement------------                                                  __          745
Vero Beach,     Fla., examination        and survey__                   --____                     __     643
Vicksburg, Miss., engineering district___---- ------         ______-----__ -                              829
Vineyard Haven Harbor, Mass., improvement__________________--------                                        87
Vinton Waterway, La.:
    Examination and survey____________-----__----------                                                   771
    Improvement       -------------------------------------------------                                   764
Virginia coast    waterway, improvement                   ---                  -         -----            380



Waackaack Creek, N. J., examination and survey_---------                                                 277
Wabash River, Ind. and Ill., flood control-- ________________________                                   1146
Waccamaw River, N. C. and S. C.:
   Improvement of river__-------------------------------------------                                      517
   Improvement of waterway via------ --------------------                                                 491
    Review of reports_____________--------------                ------------                              541
Waddington Harbor, N. Y., improvement_--    ______________________                                      1400
Wadmelaw River, S. C., improvement of waterway via-----------------                                      536
Wake Island :
    Examination and survey -------------------       ________    ___                                    1622
    Improvement of harbor__ ----------------------------------------                                    1618
Wallabout Channel, N. Y., improvement           -----------------------                                  187
Walla Walla River, Oreg. and Wash., examination for flood control-------                                1551
Wallkill River, N. Y., flood control_____----------------------_____                                     233
Walnut Lake, Md., examination and survey of channel to__ ________ -                                      386
Wappinger Creek, N. Y., improvement-------      ---------------------___                                 205
Wappoo Creek, S. C., improvement --------------------------                                              536
Warren River, R. I.:
    Examination and survey ____________       -                                                           189
    Improvement ------------------------------------------                                                129
1830                                               INDEX

Warrior River, Ala.:                                                                          Page
   Improvement       -----------------------------------------------
                                                     _                                         690
   Review of reports     ------------------------------------------                            715
Warroad Harbor and River, Minn., improvement ______ _____________                             1172
Warwick River, Md., improvement _________ ___________      _______-                            380
Washington Bayou and Lake, Miss., improvement______________________                             853
Washington Canal, N. J., improvement------------------------------                             264
Washington, D. C.:
   Anacostia Park_     --------------------------------------------                           1766
     Anacostia River, reclamation of flats- --  ---------                                     1766
     Aqueduct___
         Aqueduct___________________
                  -------------------------------------------------                           1770
                                                                                              17
    Engineering district              -----------------------------                         386
    Government buildings, consumption of water in- -_____----__                      _- 1770
    Improvement of Potomac River at __________________-----387,391
Washington Island Channel, Wis., examination and survey ------------                       1262
Washington Island Harbor, Wis., improvement----------------------- 1194
Washington Lake, Miss., improvement_____________________________                            853
Washington Lake Ship Canal, Wash., improvement __________-                    -___-- 1573
Watch Hill Cove, R. I., examination and survey---------------------- 139
Water consumption, Government buildings, District of Columbia-------- 1770
Water hyacinths, removal of, from Florida, Alabama, Mississippi, Louisi-
ana, and Texas waters                                                                680, 765
                                                                                6---------------------------------
Water levels, northern and northwestern lakes, levels, etc_--------                1775, 1778
Water power :
    Dams:
        Columbia River at Bonneville, Oreg_______________________----1529
        Missouri River at Fort Peck, Mont_______________-------__                          1022
        Passamaquoddy tidal project ---------                     -_____
                                                              ______-___--                   29
        Tennessee River             -------------------------------                        1038
    Investigations for Federal Power Commission--------------------                       1760
    Niagara River, N. Y., control and regulation of___________________--                  1781
    Surveys for               __---------------------------------637
Waters, navigable. See Bridges, Rivers and harbors, and Wrecks.
Water supply, Washington, D. C_-----------------------                                     1770
Waterways:
    See also Canals.
    Albany to Schenectady, N. Y., examination and survey of waterway_                       242
    Apalachicola Bay and River, Fla.:
        Examination and survey of waterway to New Orleans --.....                           714
        Examination and survey of waterway to Withlacoochee River_ _                        641
        Improvement of channel to St. Andrew Bay---                                         657
        Improvement of waterway to St. Marks River, Fla_                                    656
    Atlantic Intracoastal Waterway to the Gulf Intracoastal Waterway,
      examination and survey_---___--_____________                                          567
    Banana River, Fla., to Mosquito Lagoon, Fla., examination and sur-
      vey       --                                 --         --                            641
    Beaufort, N. C.:
        Improvement of waterway to Cape Fear River, including water-
           way to Jacksonville, N. C-------___                 _____________________        488
        Improvement of waterway to New River _______________ ____                     _     488
        Improvement of waterway to Pamlico Sound via Core Sound                             485
    Beaufort, S. C., to St. Johns River, Fla., improvement_______________                   551
    Beaufort to Jacksonville, N. C., improvement_ ---------------------- 488
   Caloosahatchee River, Fla., to Withlacoochee River, examination and
       survey ----------------------------------                                               641
     Cape Cod Canal, Mass., improvement ---         -------     ----------   59
     Cape Fear River, N. C., to St. Johns River, Fla., review of reports___ 513
     Cape Fear River, N. C., to Winyah Bay, S. C., improvement----------491
     Charleston, S. C.:
         Examination and survey of waterway to Columbia, S. C----------     541
         Improvement of waterway to Beaufort----------------------          536
         Improvement of waterway to Winyah Bay--------------------- 521
     Chesapeake Bay to Delaware River, Del. and Md. (Chesapeake and
       Delaware Canal), improvement -------------------
                                     _                                         -       --      295
     Choctawhatchee Bay, Fla.:
         Improvement of waterway to Pensacola Bay- --                              ------      662
         Improvement of waterway to West Bay- --------                                   _     660
                                       INDEX                                       1831
Waterways-Continued.                                                                Page-
                                                     ----------------
   Clearwater Harbor to Tampa Bay, Fla., improvement___                              631
   Core Sound to Beaufort Harbor, N. C., improvement--------    ____                 485
   Cumberland Sound, Ga. and Fla., to Mississippi River, survey------                567
   Delaware Bay, Del.:
       Waterway to Chincoteague Bay, Va., improvement______________                 319
       Waterway to Rehoboth Bay, Del., improvement.----- -------------              316
   Dulac Bayou, La., improvement of waterway via Grand Caillou and
      Le Carpe Bayous, La., to-----------------------------------------             739
    Duwamish Waterway, Wash., improvement____----------------                       1570
    Erie Harbor, Pa., to Ohio River, via French Creek and Allegheny
      River, examination and survey__-_,__-----    ------------                     1094
    Experiment station, Vicksburg, Miss-------------------------      1677,         1745
    Florida waterway, Jacksonville to the Gulf, improvement ----------               579
    Fortescue Creek, N. J., examination and survey of waterway to
      Atlantic City, N. J---------------------------------------------              342
    Franklin to Mermentau, La., improvement --------------------------               51
    Galveston to Houston, Tex., improvement--------------------------               795
    Great Choptank Waterway, Md., examination and survey of water-
      way to Little Choptank River--------------------       ------------            384
    Great Lakes-Atlantic tidewaters deeper waterway, review of reports__             242
    Hudson River, N. Y., to Hackensack River, N. J., examination and
               _------------------
      survey----                                         --------                   243
    Hylebos Waterway, Tacoma Harbor, Wash., improvement ----------      1568
    Illinois Waterway, Ill., improvement-------------------------------  970
    Interoceanic Canal, survey                              ---------               1759
    Jefferson, Tex., to Shreveport, La.:
         Examination and survey__--------------------------------------       864
         Improvement------------------------      -----                       831
    Keweenaw Bay to Lake Superior, Mich., improvement        ._____-_-
                                                               -          __ 1161
    Key West, Fla., to Jacksonville, Fla., examination and survey--------     642
    Little Choptank River to Choptank River, Md., waterway, improve-
       ment -------- -----------                                              354
    Long Island Intracoastal Waterway, N. Y., improvement-              -     164
    Louisiana and Texas intracoastal waterway:
         Improvement, Mississippi River to Corpus Christi------------ 745, 779
         Review     of reports                                                         27
                                                                                     8--------------
    Mackinac Island, Mich., to Round Island, Mich., improvement --- __--     1296
    Miami & Erie Canal, Ohio, examination and survey----------------         1094
    Miami, Fla.:
        Improvement of waterway to Florida Bay -----------------               601
        Improvement of waterway to Jacksonville ---------------------- 582
    Mississippi River, La., improvement of intracoastal waterway to Cor-
     pus Christi, Tex------------ ------------------------------- 745, 779
    Mississippi River to intracoastal waterway, examination-___                770
    Mississippi River to Sabine River, La. and Tex., improvement----____       745
    Mobile Bay, Ala.:
        Improvement of waterway to New Orleans, La------------------           665
        Review of reports on waterway to Pensacola, Fla______________          715
    New Jersey State Inland Waterway, examination and survey            --------
                                                                               342
    New Orleans, La., examinations and surveys of waterways to
    New River, N. C., to Swansboro and Beaufort, improvement -___-_
                                                                        --------
                                                                               714
                                                                               488
    New York and- New Jersey Channels, improvement-----------------            247
    New York Bay-Delaware River, review of reports-------------------          277
    New York State Barge Canal, N. Y.:
        Enlargement ---------------------------------------------              213
        Examination and survey                                                 402
                                                                              1---------------------
    Norfolk, Va., to Beaufort Inlet, N. C., improvement_________________       447
    Norfolk, Va., to sounds of North Carolina, improvement ------------        444
    Ocean City, Md., to Chincoteague Bay, waterway, examination and
      survey --------------------------------------------------------          386
    Pamlico Sound, N. C.:
        Examinations and surveys______________       _______________     _     513
        Improvement of waterways to Beaufort Harbor-___                    _   485
        Improvement of waterways to Beaufort Inlet----                 -_ __
                                                                    _ __       447
1832                                            INDEX

Waterways-Continued.                                                                                   Page
   Pensacola Bay, Fla., to Mobile Bay, Ala., improvement --------                                       663
   Pleasantville to Atlantic City, N. J., waterway, examination                                and
        survey----------------------------------------------                                            343
    Port Townsend Bay to Oak Bay, Wash., improvement--------------                                   1563
    Puget Sound to Lake Washington, improvement--__--------------                                     1573
    Sabine-Neches Waterway, Tex.:
         Examinations and surveys_--------------------------------                                     827
         Improvement ---------------------------------------                                -----      773
    St. Marys River, Fla., to proposed Gulf intracoastal waterway, exami-
       nation and survey------------------                         ------------------                  567
    Savannah, Ga., to Beaufort, S. C., improvement__--______----------                                 551
    Savannah, Ga., to Fernandina, Fla., improvement----------------                                    551
    Skipanon Channel, Oreg., improvement                                                               489
                                                                                                      1---------------------
    Swan Quarter Bay to Deep Bay, N. C., improvement_---------                                         465
    Tombigbee River, Ala. and Miss., examinations and surveys of water-
       ways connecting Tennessee and Alabama Rivers-----------------715
    Virginia coast waterway, improvement___                        __----- ---------                   380
    White Lake to Pecan Island, La., improvement _________----------                                   757
Waterways Experiment Station, Vicksburg, Miss____________----1677, 1745
Waukegan Harbor, Ill., improvement______---------                      --------------- ---            1263
Way Cake Creek, N. J., examination and survey------------------------                                  277
Weekiwachee River, Fla., examination and survey____________________                                    643
Welles Harbor, Midway Island, improvement_____------------------                                      1619
Wellfleet Harbor, Mass., examination and survey----------------------78
West Bay, Fla., improvement of waterway to Choctawhatchee Bay __                                       660
Westchester Creek, N. Y., improvement_-                                                                150
Westcott Cove, Conn., examination and survey______________-----------                                  139
West Creek, N. J., examination and survey___---                       __________--______               343
West (Hay) Harbor, Fishers Island, N. Y., improvement_______________                                    129
West Palm Beach Canal, Fla., examination and survey__________________                                  643
Westport Harbor, Conn., improvement-----                         __----------____                      129
Westport River, Mass., examination and survey_                                                          139
Westport Slough, Oreg.:
    Examination and survey---------------                                --                           1527
    Improvement -----------------------                      --             ---------------           1498
West River, Conn., improvement_                ----------------------------                            111
West Springfield, Mass., flood protection for_________________________ 134, 135
Weymouth Back River, Mass., improvement___________________________                                       70
Weymouth Fore River, Mass., improvement --                      _____-_____-________-_                   54
Whatcom (Bellingham) Harbor, Wash., improvement of Whatcom Creek
waterwa --------------------------------------------------                                           1580
Whiskey Slough, Calif., improvement_____________________________                                      1464
Whitehall Harbor, N. C., Narrows to Lake Champlain, improvement                                        221
White Lake Harbor, Mich., improvement__________________________                                       1241
White Lake to Pecan Island, La., waterway:
    Examination and survey                                                           --                 771
    Improvement        -----------------------------------------------                                  757
White River, Ark.:
    Examination and survey                                                 -                            893
    Flood control       ----------------------------------------------                                 891
    Improvement by open-channel work______________________________                                      868
White River, Ind., flood control___               ________________                                    1146
White River, S. Dak., review of reports                   ----------------------- 1021
Whitings Creek, Va., examination and survey                                                             423
Wibaux, Mont., flood control at ----------------------------------                                    1020
Wickford Harbor, R. I., improvement_._____________________----                                          129
Wicomico River, Md.:
    Examination and survey             -------------------------------------- 423
    Improvement       -----------------------------------------------                                   357
     Review of reports______                   _______                                                  386
Willamette River, Oreg.:
     Examinations and surveys__       ----- ______------------------1527
     Flood control-....                                                                         1522, 1525
      Improvement above Portland--- -----                           --------                           1501
                                              INDEX                                            1833
Willamette River, Oreg.-Continued.                                                       Page
    Improvement below Portland----------------                           --------------- 1492
    Improvement at Willamette Falls ----------------------------                         1505
Willamette Slough, Oreg., improvement- -----                    __------------------ 1500
Willapa Harbor and River, Wash., improvement                       __------------------- 1552
Willoughby Channel, Va., improvement_ _                 ________ __-___--                 433
Willoughby Spit, Va., beach erosion investigation__-----------------                     1775
Willow Creek, Oreg., examination for flood control ------------------                    1551
Willow Slough, Ill., review of reports-------------------------------                     957
Wilmette Harbor, Ill., examination and survey_                                 -1287
                                                                   _______-------
Wilmington Harbor, Del., improvement_------                    ___-------------           292
Wilmington, N. C., engineering district_______------             ----------------         465
Wilson Harbor, N. Y., examination and survey_______________                              1402
Wilson River, Oreg., examination for flood control_____------------------                1527
Winnebago Lake, Wis., improvement of Fox River___---------------                         1188
Winnibigoshish Reservoir, Minn., construction------------------------                     958
Winooski River, Vt., flood control         __________---------------      -------------- 229
Winyah Bay, S. C.:
    Improvement----------------------------------------------                             514
    Improvement of waterway to Cape Fear River, N. C_____                                 491
    Improvement of waterway to Charleston________-------------------                      521
    Review of reports_-----------------                                                   541
Withlacoochee River, Fla.:
    Examination and survey                                                                641
    Improvement __---------------------                                                   640
    Improvement of ship canal across Florida via _________________-_                      579
Wolf Bay, Ala., improvement of intracoastal waterway via--------------- 663
Wolf River, Miss., improvement_ --------------------                                      708
Wolf River, Tenn., flood control_________-- ___-------------------                        888
Wolf River (Memphis Harbor), Tenn., improvement-------------------                        881
Wolf River (tributary of the Fox), Wis., improvement-----------------1188
Woodbridge Creek, N. J., improvement--_ ----------------------------                      258
Woodbury Creek, N. J., improvement___ ----                    --              -------     323
Woods Creek, Va., examination and survey               --------------------------- 423
Wrangell Harbor and Narrows, Alaska :
    Examination and survey                                              ---------------  1607
     Improvement of harbor----------------                                               1583
     Improvement of narrows                                                                      1_________--------586
Wrecks :
   Appropriations    --------------------------------------------                                1762
   Expenditures during the year--------------------------------1763
   Permanent appropriation for __________________-______--___-__                                    14
     Removal of       ---------------------------                                                1762

                                                  Y
Yakima River, Wash., examination for flood control                            __               1607
Yalobusha River, Miss., improvement                                                 -------
                                                                                    ______       8--------------__
                                                                                                 846
Yamhill River, Oreg., improvement-----------                          ____ --      --          1501
Yaquina Bay, Harbor, and River, Oreg.:
    Examination and survey__-------------------- --------                             __ - -1527
     Improvement of bay and harbor______________-_____________                                 1483
    Improvement of river          ________             ----------------                        1482
Yazoo River, Miss.:
     Improvement-------                ------------------------------------                      844
     Improvement of mouth-__-----------------               -----           __        _          851
Yellowstone River, N. Dak., Mont., and Wyo.:
    Flood control______________                                                                  020
                                                                                               1----------------------
,    Improvement-----------                --------------------------------                    1017
     Review of reports--------------------------                            --------------- 1021
York Harbor, Maine, improvement --------------------------------                                  70
York River, Va.:
     Improvement -----               ----------------------------------                     412, 417
     Review of reports---------------423
York Spit, Chesapeake Bay, Va., shoals opposite, removal---------------                            344
1834                                    INDEX

                                                                                  Page
Youghiogheny River, Pa., improvement               ----------------------------   1085
Youngs Bay and River, Oreg., improvement----------------------                    1491
Yscloskey Bayou, La.:
    Examination and survey           ----------------------------------            770
    Improvement             --------------------------------                       726
Yuba River, Calif., construction of restraining dams---------------               1651



Zanesville, Ohio, engineering district1------------------------------              095
Zuninga Shoal, San Diego Harbor, Calif----------------------------                1408
